HARGA
NO. URAIAN SATUAN
SATUAN ( Rp )
HARGA
NO. KOMPONEN MATERIAL / BAHAN SATUAN
SATUAN ( Rp )
( Rp. ) ( Rp. )
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
- Besi Beton Polos (6Ø10 mm) 1,075.95 14,000.00 15,063,300.00 1.43 0.48 0.48 0.48
- Besi Beton Polos (Ø8-200 mm) 574.01 14,000.00 8,036,140.00 0.77 0.26 0.26 0.26
- Bekisting 96.88 345,000.00 33,423,600.00 3.18 1.59 1.59
- Pekerjaan Lain-lain 18.17 20,000.00 363,400.00 0.03 0.03
II PEKERJAAN GAPURA
A PEKERJAAN TANAH DAN PONDASI
Pondasi Tapak
1 Galian Tanah Pondasi Tapak 4.23 45,000.00 190,350.00 0.02 0.02
2 Beton Cor Lantai Kerja 7 cm 0.37 565,000.00 209,050.00 0.02 0.02
3 Pasangan Batu Kosong 0.53 241,000.00 127,730.00 0.01 0.01
4 Urugan Tanah Kembali 1.06 21,000.00 22,260.00 0.00 0.00
Pondasi Menerus Batu Gunung
1 Galian Tanah Pondasi Batu Gunung 2.98 45,000.00 134,100.00 0.01 0.01
2 Urugan pasir Alas Pondasi Menerus 0.30 138,000.00 41,400.00 0.00 0.00
3 Pas. Aanstamping tebal 10 cm 0.60 241,000.00 144,600.00 0.01 0.01
4 Pas. Pondasi Batu Gunung 1pc : 4ps 2.98 549,000.00 1,636,020.00 0.16 0.16
5 Angchor stik dia 10-100 mm 3.67 14,000.00 51,380.00 0.00 0.00
6 Urugan Tanah Kembali 0.74 21,000.00 15,540.00 0.00 0.00
7 Timbunan Tanah 11.17 32,000.00 357,440.00 0.03 0.03
B PEKERJAAN BETON BERTULANG
1 Pondasi Tapak (190 X 70 cm)
- Beton Cor K-250 1.06 761,000.00 806,660.00 0.08 0.08
- Besi Beton Polos (Ø12-150 mm) Tikar Atas 198.56 14,000.00 2,779,840.00 0.26 0.26
60%
- Besi Beton Polos (Ø12-150 mm) Tikar Bawah 87.73 14,000.00 1,228,220.00 0.12 0.12
- Bekisting 1.39 192,000.00 266,880.00 0.03 0.03
- Pekerjaan Lain-lain 1.06 20,000.00 21,200.00 0.00 0.00
2 Kolom Beton Bawah Sloof
- Beton Cor K-250 0.33 761,000.00 251,130.00 0.02 0.02
- Besi Beton Polos (4Ø12 mm) 18.47 14,000.00 258,580.00 0.02 0.02
- Besi Beton Polos (2Ø10 mm) 6.42 14,000.00 89,880.00 0.01 0.01
- Besi Beton Polos (Ø6-125 mm) 9.24 14,000.00 129,360.00 0.01 0.01
- Bekisting 1.73 345,000.00 596,850.00 0.06 0.06
- Pekerjaan Lain-lain 0.33 20,000.00 6,600.00 0.00 0.00
3 Sloof Beton Uk. 25 x 30 cm
- Beton Cor K-250 1.61 761,000.00 1,225,210.00 0.12 0.12
- Besi Beton Polos (4Ø12 mm) 76.44 14,000.00 1,070,160.00 0.10 0.10
- Besi Beton Polos (4Ø10 mm) 53.11 14,000.00 743,540.00 0.07 0.07
- Besi Beton Polos (Ø6-120 mm) 43.79 14,000.00 613,060.00 0.06 0.06
- Bekisting 4.30 211,000.00 907,300.00 0.09 0.09
- Pekerjaan Lain-lain 1.61 20,000.00 32,200.00 0.00 0.00
4 Kolom Beton Uk. 25 x 25 cm Elv. 4,13 m
- Beton Cor K-250 2.07 761,000.00 1,575,270.00 0.15 0.15
- Besi Beton Polos (4Ø12 mm) 117.36 14,000.00 1,643,040.00 0.16 0.16
- Besi Beton Polos (2Ø10 mm) 40.77 14,000.00 570,780.00 0.05 0.05
50%
- Besi Beton Polos (Ø6-125 mm) 58.68 14,000.00 821,520.00 0.08 0.08
- Bekisting 11.01 345,000.00 3,798,450.00 0.36 0.36
- Pekerjaan Lain-lain 2.07 20,000.00 41,400.00 0.00 0.00
5 Kolom Beton Uk. 25 x 25 cm Elv.4,7 m
- Beton Cor K-250 1.18 761,000.00 897,980.00 0.09 0.09
- Besi Beton Polos (4Ø12 mm) 66.78 14,000.00 934,920.00 0.09 0.09
- Besi Beton Polos (2Ø10 mm) 23.20 14,000.00 324,800.00 0.03 0.03
- Besi Beton Polos (Ø6-125 mm) 33.39 14,000.00 467,460.00 0.04 0.04
- Bekisting 6.27 345,000.00 2,163,150.00 0.21 0.21
- Pekerjaan Lain-lain 1.18 20,000.00 23,600.00 0.00 0.00
6 Kolom Praktis Uk. 13 x 13 cm
- Beton Cor K-250 0.48 761,000.00 365,280.00 0.03 0.03
- Besi Beton Polos (4Ø12 mm) 100.17 14,000.00 1,402,380.00 0.13 0.13
- Besi Beton Polos (2Ø10 mm) 34.80 14,000.00 487,200.00 0.05 0.05
- Besi Beton Polos (Ø6-125 mm) 26.04 14,000.00 364,560.00 0.03 0.03
- Bekisting 4.89 345,000.00 1,687,050.00 0.16 0.16
- Pekerjaan Lain-lain 0.48 20,000.00 9,600.00 0.00 0.00
7 Balok Latai Uk. 13 x 15 cm
- Beton Cor K-250 0.84 761,000.00 639,240.00 0.06 0.06
- Besi Beton Polos (4Ø10 mm) 106.22 14,000.00 1,487,080.00 0.14 0.14
- Besi Beton Polos (Ø6-125 mm) 42.81 14,000.00 599,340.00 0.06 0.06 40%
Progres rencana Mingguan 0.36 1.62 4.29 8.48 3.26 4.01 8.68 7.50 5.29 3.39 4.81 11.60 3.49 3.45 6.18 9.26 2.64 5.86 3.66 2.16
Progres Rencana Kumulatif Mingguan ( % ) 0.36 1.98 6.27 14.75 18.02 22.03 30.71 38.21 43.50 46.89 51.70 63.29 66.78 70.23 76.41 85.67 88.32 94.18 97.84 ###
RENCANA ANGGARAN BIAYA
Pekerjaan : PEMBANGUNAN PAGAR SMK PENERBANGAN ACEH
Tahun Anggaran : 2014
Lokasi : BLANG BINTANG - ACEH BESAR
Harga Satuan Jumlah Harga
( Rp. ) ( Rp. )
I PEKERJAAN PENGEBORAN AIR TANAH
A PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan 1.00 Ls Taksir 1,000,000.00 1,000,000.00
2 Pemasangan Bouwplank 1.00 Ls Taksir 2,500,000.00 2,500,000.00
3 Direksi Keet/Barak Kerja (sewa) 1.00 Ls Taksir 2,000,000.00 2,000,000.00
4 Pengadaan Air Kerja Dan Listrik Kerja 1.00 Ls Taksir 2,000,000.00 2,000,000.00
5 Dokumentasi Dan Administrasi 1.00 Unit Taksir 1,493,000.00 1,493,000.00
Sub Jumlah 8,993,000.00
II PAGAR DEPAN
A PEKERJAAN TANAH DAN PONDASI
Pondasi Tapak
1 Galian Tanah Pondasi Tapak 65.39 M3 SNI.2835.2008-6.1 45,000.00 2,942,550.00
2 Urugan Pasir Alas Pondasi Tapak tebal 5 cm 3.11 M3 SNI.2835.2008-6.11 138,000.00 429,180.00
3 Pasangan Batu Kosong 6.23 M3 SNI.2836.2008.69 241,000.00 1,501,430.00
4 Urugan Tanah Kembali 16.35 M3 SNI.2835.2008-6.9 21,000.00 343,350.00
Pondasi Menerus Batu Gunung
1 Galian Tanah Pondasi Batu Gunung 102.05 M3 SNI.2835.2008-6.1 45,000.00 4,592,250.00
2 Urugan pasir Alas Pondasi Menerus 10.83 M3 SNI.2835.2008-6.11 138,000.00 1,494,540.00
3 Pas. Aanstamping tebal 10 cm 21.65 M3 SNI.2836.2008.69 241,000.00 5,217,650.00
4 Pas. Pondasi Batu Gunung 1pc : 4ps 97.43 M3 SNI.2836.2008.6.2 549,000.00 53,489,070.00
5 Angchor stik dia 10-100 mm 160.30 Kg SNI.7394.2008-6.17a 14,000.00 2,244,200.00
6 Urugan Tanah Kembali 33.56 M3 SNI.2835.2008-6.9 21,000.00 704,760.00
Sub Jumlah 72,958,980.00
B PEKERJAAN BETON BERTULANG
1 Pondasi Tapak (60 X 60 cm)
- Beton Cor K-250 12.46 M3 SNI.7394.2008-6.7 761,000.00 9,482,060.00
- Besi Beton Polos (Ø12-100 mm) Tikar Atas 1,566.96 Kg SNI.7394.2008-6.17a 14,000.00 21,937,440.00
- Besi Beton Polos (Ø12-100 mm) Tikar Bawah 1,566.96 Kg SNI.7394.2008-6.17a 14,000.00 21,937,440.00
- Bekisting 27.68 M2 SNI.7394.2008-6.20 192,000.00 5,314,560.00
- Pekerjaan Lain-lain 12.46 Ls Taksir 20,000.00 249,200.00
2 Kolom Beton Bawah Sloof
- Beton Cor K-250 9.41 M3 SNI.7394.2008-6.7 761,000.00 7,161,010.00
- Besi Beton Polos (6Ø10 mm) 557.19 Kg SNI.7394.2008-6.17a 14,000.00 7,800,660.00
- Besi Beton Polos (Ø8-200 mm) 297.26 Kg SNI.7394.2008-6.17a 14,000.00 4,161,640.00
- Bekisting 50.17 M2 SNI.7394.2008-6.22 345,000.00 17,308,650.00
- Pekerjaan Lain-lain 9.41 Ls Taksir 20,000.00 188,200.00
3 Sloof Beton Uk. 15 x 20 cm
- Beton Cor K-250 12.99 M3 SNI.7394.2008-6.7 761,000.00 9,885,390.00
- Besi Beton Polos (4Ø10 mm) 1,068.44 Kg SNI.7394.2008-6.17a 14,000.00 14,958,160.00
- Besi Beton Polos (Ø8-200 mm) 598.62 Kg SNI.7394.2008-6.17a 14,000.00 8,380,680.00
- Bekisting 57.73 M2 SNI.7394.2008-6.21 211,000.00 12,181,030.00
- Pekerjaan Lain-lain 12.99 Ls Taksir 20,000.00 259,800.00
4 Kolom Beton Uk. 25 x 25 cm
- Beton Cor K-250 18.17 M3 SNI.7394.2008-6.7 761,000.00 13,827,370.00
- Besi Beton Polos (6Ø10 mm) 1,075.95 Kg SNI.7394.2008-6.17a 14,000.00 15,063,300.00
- Besi Beton Polos (Ø8-200 mm) 574.01 Kg SNI.7394.2008-6.17a 14,000.00 8,036,140.00
- Bekisting 96.88 M2 SNI.7394.2008-6.22 345,000.00 33,423,600.00
- Pekerjaan Lain-lain 18.17 Ls Taksir 20,000.00 363,400.00
Jumlah Harga
No. Uraian Pekerjaan
( Rp. )
II PAGAR DEPAN
IV PAGAR SAMPING
DIBULATKAN 1,155,000,000.00
PEKERJAAN PERSIAPAN
SNI-03-2835-2002-6.4
1 M' Pengukuran dan Pemasaangan Bowplank
0.0120 M3 Kayu Kasau 5/7 Rp. 2,000,000.00 = Rp. 24,000.00
0.0070 M3 Papan 3/20 Rp. 3,500,000.00 = Rp. 24,500.00
0.0200 M3 Paku Kayu Rp. 20,000.00 = Rp. 400.00
0.1000 OH Pekerja Rp. 58,000.00 = Rp. 5,800.00
0.1000 OH Tukang Rp. 58,000.00 = Rp. 5,800.00
0.0100 OH Kepala Tukang Rp. 60,000.00 = Rp. 600.00
0.0050 OH Mandor Rp. 60,000.00 = Rp. 300.00
Jumlah = Rp. 61,400.00
Dibulatkan = Rp. 61,000.00
SNI.2835.2008-6.1
Menggali 1 M3 Tanah Biasa Sedalam 1 M
0.7500 OH Pekerja Rp. 58,000.00 = Rp. 43,500.00
0.0250 OH Mandor Rp. 60,000.00 = Rp. 1,500.00
Jumlah = Rp. 45,000.00
Dibulatkan = Rp. 45,000.00
SNI.2835.2008-6.9
1 M3 Urugan Tanah Kembali
0.3500 OH Pekerja Rp. 58,000.00 = Rp. 20,300.00
0.0223 OH Mandor Rp. 60,000.00 = Rp. 1,338.00
Jumlah = Rp. 21,638.00
Dibulatkan = Rp. 21,000.00
SNI.2835.2008-6.11
Mengurug 1 M3 Pasir Urug
1.2000 M3 Pasir Urug Rp. 100,000.00 = Rp. 120,000.00
0.3000 OH Pekerja Rp. 58,000.00 = Rp. 17,400.00
0.0100 OH Mandor Rp. 60,000.00 = Rp. 600.00
Jumlah = Rp. 138,000.00
Dibulatkan = Rp. 138,000.00
PEKERJAAN BETON
SNI 7394 : 2008 - 6.4
Membuat 1 M3 Lantai Kerja Beton Mutu f'c = 7,4 Mpa (K 100), Slump (3-6) cm, w/c = 0,87
230.0000 Kg Semen Portland @ 40 Kg Rp. 1,200.00 = Rp. 276,000.00
893.0000 Kg Pasir Beton Rp. 110,000.00 = Rp. 98,230,000.00
1,027.0000 Kg Kerikil Beton Rp. 110,000.00 = Rp. 112,970,000.00
200.0000 Ltr liter Air Rp. 200.00 = Rp. 40,000.00
1.2000 OH Pekerja Rp. 58,000.00 = Rp. 69,600.00
0.0200 OH Tukang Rp. 58,000.00 = Rp. 1,160.00
0.0200 OH Kepala Tukang Rp. 60,000.00 = Rp. 1,200.00
0.0600 OH Mandor Rp. 60,000.00 = Rp. 3,600.00
Jumlah = Rp. 211,591,560.00
Dibulatkan = Rp. 211,591,000.00
PEKERJAAN PONDASI
SNI 2836 : 2008 - 6.9
Memasang 1 M3 Batu Kosong (Aanstamping)
1.2000 M3 Batu Gunung/Batu Belah 15 Cm/20 Cm Rp. 105,000.00 = Rp. 126,000.00
0.4320 M3 Pasir Urug Rp. 100,000.00 = Rp. 43,200.00
0.7800 OH Pekerja Rp. 58,000.00 = Rp. 45,240.00
0.3900 OH Tukang Rp. 58,000.00 = Rp. 22,620.00
0.0390 OH Kepala Tukang Rp. 60,000.00 = Rp. 2,340.00
0.0390 OH Mandor Rp. 60,000.00 = Rp. 2,340.00
Jumlah = Rp. 241,740.00
Dibulatkan = Rp. 241,000.00
SNI.7394.2008-6.7
1 M3 Membuat Beton Bertulang (K-250)
384.0000 Kg Semen Portland @ 40 Kg Rp. 1,200.00 = Rp. 460,800.00
0.4940 Kg Pasir Beton Rp. 110,000.00 = Rp. 54,340.00
0.7700 Kg Kerikil Beton Rp. 110,000.00 = Rp. 84,700.00
215.0000 Ltr liter Air Rp. 200.00 = Rp. 43,000.00
1.6500 OH Pekerja Rp. 58,000.00 = Rp. 95,700.00
0.2750 OH Tukang Rp. 58,000.00 = Rp. 15,950.00
0.0280 OH Kepala Tukang Rp. 60,000.00 = Rp. 1,680.00
0.0830 OH Mandor Rp. 60,000.00 = Rp. 4,980.00
Jumlah = Rp. 761,150.00
Dibulatkan = Rp. 761,000.00
SNI.7394.2008-6.20
Memasang 1 M2 Bekisting untuk Pondasi
0.0400 M3 Kayu kelas III Rp. 3,800,000.00 = Rp. 152,000.00
0.3000 Kg Paku kayu Rp. 20,000.00 = Rp. 6,000.00
0.1000 Liter Minyak bekisting Rp. 6,000.00 = Rp. 600.00
0.3000 OH Pekerja Rp. 58,000.00 = Rp. 17,400.00
0.2600 OH Tukang Rp. 58,000.00 = Rp. 15,080.00
0.0260 OH Kepala Tukang Rp. 60,000.00 = Rp. 1,560.00
0.0050 OH Mandor Rp. 60,000.00 = Rp. 300.00
Jumlah = Rp. 192,940.00
Dibulatkan = Rp. 192,000.00
SNI.2836.2008.6.2
Memasang 1 M3 Pondasi Batu Belah, Campuran 1 PC : 4 PP
1.2000 M3 Batu Gunung/Batu Belah 15 Cm/20 Cm Rp. 105,000.00 = Rp. 126,000.00
0.5200 M3 Pasir Pasang Rp. 110,000.00 = Rp. 57,200.00
163.0000 Kg Semen Portland @ 40 Kg Rp. 1,200.00 = Rp. 195,600.00
1.5000 OH Pekerja Rp. 58,000.00 = Rp. 87,000.00
0.6000 OH Tukang Rp. 58,000.00 = Rp. 34,800.00
0.0600 OH Kepala Tukang Rp. 60,000.00 = Rp. 3,600.00
0.7500 OH Mandor Rp. 60,000.00 = Rp. 45,000.00
Jumlah = Rp. 549,200.00
Dibulatkan = Rp. 549,000.00
SNI.7394.2008-6.17a
1 Kg Pembesian dengan Besi Polos
1.0500 Kg Besi beton Polos Rp. 13,000.00 = Rp. 13,650.00
0.0150 Kg Kawat beton Rp. 20,000.00 = Rp. 300.00
0.0070 OH Pekerja Rp. 58,000.00 = Rp. 406.00
0.0070 OH Tukang Rp. 58,000.00 = Rp. 406.00
0.0007 OH Kepala Tukang Rp. 60,000.00 = Rp. 42.00
0.0004 OH Mandor Rp. 60,000.00 = Rp. 24.00
Jumlah = Rp. 14,828.00
Dibulatkan = Rp. 14,000.00
SNI.7394.2008-6.22
Memasang 1 M2 Bekisting untuk Kolom
0.0400 M3 Kayu kelas III Rp. 3,800,000.00 = Rp. 152,000.00
0.4000 Kg Paku kayu Rp. 20,000.00 = Rp. 8,000.00
0.2000 Ltr Minyak bekisting Rp. 6,000.00 = Rp. 1,200.00
0.0150 M3 Balok Kayu Kelas II Rp. 4,000,000.00 = Rp. 60,000.00
0.3500 Lbr Plywood 9 mm Rp. 65,000.00 = Rp. 22,750.00
2.0000 Btg Dolken Kayu ø 8-10/4 m Rp. 20,000.00 = Rp. 40,000.00
0.6600 OH Pekerja Rp. 58,000.00 = Rp. 38,280.00
0.3300 OH Tukang Rp. 58,000.00 = Rp. 19,140.00
0.0330 OH Kepala Tukang Rp. 60,000.00 = Rp. 1,980.00
0.0330 OH Mandor Rp. 60,000.00 = Rp. 1,980.00
Jumlah = Rp. 345,330.00
Dibulatkan = Rp. 345,000.00
SNI.7394.2008-6.21
Memasang 1 M2 Bekisting untuk Sloof
0.0450 M3 Kayu kelas III Rp. 3,800,000.00 = Rp. 171,000.00
0.3000 Kg Paku kayu Rp. 20,000.00 = Rp. 6,000.00
0.1000 Ltr Minyak bekisting Rp. 6,000.00 = Rp. 600.00
0.3000 OH Pekerja Rp. 58,000.00 = Rp. 17,400.00
0.2600 OH Tukang Rp. 58,000.00 = Rp. 15,080.00
0.0260 OH Kepala Tukang Rp. 60,000.00 = Rp. 1,560.00
0.0050 OH Mandor Rp. 60,000.00 = Rp. 300.00
Jumlah = Rp. 211,940.00
Dibulatkan = Rp. 211,000.00
SNI.7394.2008-6.23
Memasang 1 M2 Bekisting untuk Balok
0.0400 M3 Kayu Kelas II (Kamper/Kruing/dll) Rp. 4,000,000.00 = Rp. 160,000.00
0.4000 Kg Paku kayu Rp. 20,000.00 = Rp. 8,000.00
0.2000 Ltr Minyak bekisting Rp. 6,000.00 = Rp. 1,200.00
0.0180 M3 Kayu Klas III (Borneo/dll) Rp. 3,800,000.00 = Rp. 68,400.00
0.3500 Lbr Plywood 9 mm Rp. 65,000.00 = Rp. 22,750.00
2.0000 Btg Dolken Kayu ø 8-10/4 m Rp. 20,000.00 = Rp. 40,000.00
0.6600 OH Pekerja Rp. 58,000.00 = Rp. 38,280.00
0.3300 OH Tukang Rp. 58,000.00 = Rp. 19,140.00
0.0330 OH Kepala Tukang Rp. 60,000.00 = Rp. 1,980.00
0.0330 OH Mandor Rp. 60,000.00 = Rp. 1,980.00
Jumlah = Rp. 361,730.00
Dibulatkan = Rp. 361,000.00
SNI 7394:2008/6.19
Memasang 1 Kg Jaring Kawat Baja/Wire Mesh
0.0250 OH Pekerja Rp. 58,000.00 Rp. 1,450.00
0.0250 OH Tukang Rp. 58,000.00 Rp. 1,450.00
0.0020 OH Kepala Tukang Rp. 60,000.00 Rp. 120.00
0.0010 OH Mandor Rp. 60,000.00 Rp. 60.00
1.0200 Kg Jaring Kawat Baja dilas Rp. 15,000.00 Rp. 15,300.00
0.0500 Kg Kawat beton Rp. 20,000.00 Rp. 1,000.00
Jumlah Rp. 19,380.00
Dibulatkan Rp. 19,000.00
PEKERJAAN ATAP
SNI.DT-91-0011-2007-AT SD
Memasang 1 M2 Atap Seng Spandex 0,40 MM
1.4000 Lbr Seng Spandex 0,40 MM Rp. 50,000.00 Rp. 70,000.00
12.0000 Bh Paku Ulir Rp. 500.00 Rp. 6,000.00
1.0000 Ls Alat Bantu Rp. 1,000.00 Rp. 1,000.00
0.2000 OH Pekerja Rp. 58,000.00 Rp. 11,600.00
0.1000 OH Tukang Rp. 58,000.00 Rp. 5,800.00
0.0100 OH Kepala Tukang Rp. 60,000.00 Rp. 600.00
0.0010 OH Mandor Rp. 60,000.00 Rp. 60.00
Jumlah Rp. 95,060.00
Dibulatkan Rp. 95,000.00
SNI.DT-91-0011-2007-RB SD
Memasang 1 M' Rabung Seng Spandex 0,40 MM
1.2000 Lbr Rabung Seng Spandex 0,40 MM Rp. 25,000.00 Rp. 30,000.00
8.0000 Bh Paku Ulir Rp. 500.00 Rp. 4,000.00
1.0000 Ls Alat Bantu Rp. 1,000.00 Rp. 1,000.00
0.3500 OH Pekerja Rp. 58,000.00 Rp. 20,300.00
0.2500 OH Tukang Rp. 58,000.00 Rp. 14,500.00
0.0300 OH Kepala Tukang Rp. 60,000.00 Rp. 1,800.00
0.0030 OH Mandor Rp. 60,000.00 Rp. 180.00
Jumlah Rp. 71,780.00
Dibulatkan Rp. 71,000.00
SNI.DT-91-0011-2007-05
1 M' Pasang Lisplank GRC 9 MM
0.5000 Lbr Lisplang GRC Board 9 mm Rp. 35,000.00 Rp. 17,500.00
0.0500 Kg Paku Sekrup Rp. 20,000.00 Rp. 1,000.00
0.1000 OH Pekerja Rp. 58,000.00 Rp. 5,800.00
0.0500 OH Tukang Rp. 58,000.00 Rp. 2,900.00
0.0050 OH Kepala Tukang Rp. 60,000.00 Rp. 300.00
0.0050 OH Mandor Rp. 60,000.00 Rp. 300.00
Jumlah Rp. 27,800.00
Dibulatkan Rp. 27,000.00
SNI 6897 : 2008 - 6.7
Memasang 1 M2 Dinding Bata Merah Tebal 1/2 Bata, Campuran 1PC : 2PP
0.0380 M3 Pasir Pasang Rp. 110,000.00 Rp. 4,180.00
70.0000 Bh Batu Bata Rp. 600.00 Rp. 42,000.00
18.9500 Kg Semen Portland @ 40 Kg Rp. 1,200.00 Rp. 22,740.00
0.3000 OH Pekerja Rp. 58,000.00 Rp. 17,400.00
0.1000 OH Tukang Rp. 58,000.00 Rp. 5,800.00
0.0100 OH Kepala Tukang Rp. 60,000.00 Rp. 600.00
0.0150 OH Mandor Rp. 60,000.00 Rp. 900.00
Jumlah Rp. 93,620.00
Dibulatkan Rp. 93,000.00
SNI.6897.2008-6.9
1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 PC : 4 PS
0.0430 M3 Pasir Pasang Rp. 110,000.00 Rp. 4,730.00
70.0000 Bh Batu Bata Rp. 600.00 Rp. 42,000.00
11.5000 Kg Semen Portland @ 40 Kg Rp. 1,200.00 Rp. 13,800.00
0.3000 OH Pekerja Rp. 58,000.00 Rp. 17,400.00
0.1000 OH Tukang Rp. 58,000.00 Rp. 5,800.00
0.0100 OH Kepala Tukang Rp. 60,000.00 Rp. 600.00
0.0150 OH Mandor Rp. 60,000.00 Rp. 900.00
Jumlah Rp. 85,230.00
Dibulatkan Rp. 85,000.00
SNI 2837:2008/6.27
Membuat 1 M2 Acian
0.2000 OH Pekerja Rp. 58,000.00 Rp. 11,600.00
0.1000 OH Tukang Rp. 58,000.00 Rp. 5,800.00
0.0100 OH Kepala Tukang Rp. 60,000.00 Rp. 600.00
0.0100 OH Mandor Rp. 60,000.00 Rp. 600.00
3.2500 Kg Portland Cement Rp. 1,200.00 Rp. 3,900.00
Jumlah Rp. 22,500.00
Dibulatkan Rp. 22,000.00
Anl. Suplemen 2
1 M2 Pekerjaan Floordeck
0.0320 OH Pekerja Rp. 58,000.00 Rp. 1,856.00
0.0330 OH Tukang Rp. 58,000.00 Rp. 1,914.00
0.0033 OH Kepala Tukang Rp. 60,000.00 Rp. 198.00
0.0006 OH Mandor Rp. 60,000.00 Rp. 36.00
1.1000 M2 Smartdeck by BlueScope Rp. 80,000.00 Rp. 88,000.00
0.2000 Ls Stut werk Rp. 50,000.00 Rp. 10,000.00
1.0000 Ls Alat Rp. 20,000.00 Rp. 20,000.00
Jumlah Rp. 122,004.00
Dibulatkan Rp. 122,000.00
SNI.DT-91-0010-2007-FD
10 M2 Floor Hardener
50.2000 Kg Silika quarzt Rp. 20,000.00 = Rp. 1,004,000.00
1.0000 OH Pekerja Rp. 58,000.00 = Rp. 58,000.00
0.5000 OH Kepala Tukang Rp. 60,000.00 = Rp. 30,000.00
0.5000 OH Tukang Rp. 58,000.00 = Rp. 29,000.00
Jumlah = Rp. 1,121,000.00
Dibulatkan = Rp. 1,121,000.00
0.1000 Untuk 1 M2 Floor Hardener @ Rp. 1,121,000.00 = Rp. 112,100.00
SNI.DT-91-0013-2007-PGa
Memasang 1 M2 Langit - Langit GRC 4 MM
0.3640 Lbr GRC Board 4 mm Rp. 75,000.00 Rp. 27,300.00
0.1100 Kg Paku Sekrup Rp. 20,000.00 Rp. 2,200.00
0.1500 OH Pekerja Rp. 58,000.00 Rp. 8,700.00
0.2500 OH Tukang Rp. 58,000.00 Rp. 14,500.00
0.0250 OH Kepala Tukang Rp. 60,000.00 Rp. 1,500.00
0.0050 OH Mandor Rp. 60,000.00 Rp. 300.00
Jumlah Rp. 54,500.00
Dibulatkan Rp. 54,000.00
SNI.T-38-2000-C-Pb
1 M2 Pengecatan Dasar Permukaan Baja
0.2500 Kg Cat Dasar Besi (expoksi) Rp. 35,000.00 Rp. 8,750.00
0.1000 Jam Mesin Kompresor Rp. 20,000.00 Rp. 2,000.00
1.0000 Ls Alat Bantu Rp. 5,000.00 Rp. 5,000.00
0.1000 Ltr Minyak Cat Rp. 37,000.00 Rp. 3,700.00
0.0200 OH Pekerja Rp. 58,000.00 Rp. 1,160.00
0.2000 OH Tukang Rp. 58,000.00 Rp. 11,600.00
0.0200 OH Kepala Tukang Rp. 60,000.00 Rp. 1,200.00
0.0100 OH Mandor Rp. 60,000.00 Rp. 600.00
Jumlah Rp. 34,010.00
Dibulatkan Rp. 34,000.00
SNI.T-38-2000-C-Pb2
1 M2 Pengecatan Permukaan Baja
0.2000 Kg Cat Duco Rp. 35,000.00 Rp. 7,000.00
0.1000 Jam Mesin Kompresor Rp. 5,000.00 Rp. 500.00
1.0000 Ls Alat Bantu Rp. 5,000.00 Rp. 5,000.00
0.1000 Ltr Minyak Cat Rp. 37,000.00 Rp. 3,700.00
0.0200 OH Pekerja Rp. 58,000.00 Rp. 1,160.00
0.2000 OH Tukang Rp. 58,000.00 Rp. 11,600.00
0.0200 OH Kepala Tukang Rp. 60,000.00 Rp. 1,200.00
0.0100 OH Mandor Rp. 60,000.00 Rp. 600.00
Jumlah Rp. 30,760.00
Dibulatkan Rp. 30,000.00
SNI-03-2408-2002-6.14
1 M2 Pengecatan Tembok dan Plafond
0.1000 Kg Plamir Rp. 30,000.00 Rp. 3,000.00
0.1000 Kg Cat Dasar Rp. 35,000.00 Rp. 3,500.00
0.2600 Kg Cat Penutup 2 X Rp. 45,000.00 Rp. 11,700.00
0.0200 OH Pekerja Rp. 58,000.00 Rp. 1,160.00
0.0630 OH Tukang Rp. 58,000.00 Rp. 3,654.00
0.0063 OH Kepala Tukang Rp. 60,000.00 Rp. 378.00
0.0025 OH Mandor Rp. 60,000.00 Rp. 150.00
Jumlah Rp. 23,542.00
Dibulatkan Rp. 23,000.00
RSNI.T-15-2002-KD
Memasang 1 buah Kloset Duduk
1.0000 Bh Kloset Duduk Rp. 800,000.00 Rp. 800,000.00
0.0600 % Perlengkapan 6% harga Klosed Rp. 48,000.00 Rp. 2,880.00
3.3000 OH Pekerja Rp. 58,000.00 Rp. 191,400.00
1.1000 OH Tukang Rp. 58,000.00 Rp. 63,800.00
0.0010 OH Kepala Tukang Rp. 60,000.00 Rp. 60.00
0.1600 OH Mandor Rp. 60,000.00 Rp. 9,600.00
Jumlah Rp. 1,067,740.00
Dibulatkan Rp. 1,067,000.00
RSNI.T-15-2002-FD
Memasang 1 buah Floor Drain
1.0000 Bh Floor drain Rp. 30,000.00 Rp. 30,000.00
0.1200 % Perlegkapan 12 % Rp. 3,600.00 Rp. 432.00
0.0100 Bh Pekerja Rp. 58,000.00 Rp. 580.00
0.1000 OH Tukang Rp. 58,000.00 Rp. 5,800.00
0.0100 OH Kepala Tukang Rp. 60,000.00 Rp. 600.00
0.0050 OH Mandor Rp. 60,000.00 Rp. 300.00
Jumlah Rp. 37,712.00
Dibulatkan Rp. 37,000.00
RSNI.T-15-2002-PV3
Memasang 1 M' Pipa PVC Tipe AW 3"
1.2000 M' Pipa PVC Rp. 30,000.00 Rp. 36,000.00
0.3500 % Perlegkapan 35.0% Harga pipa Rp. 10,500.00 Rp. 3,675.00
0.0540 OH Pekerja Rp. 58,000.00 Rp. 3,132.00
0.0900 OH Tukang Rp. 58,000.00 Rp. 5,220.00
0.0090 OH Kepala Tukang Rp. 60,000.00 Rp. 540.00
0.0027 OH Mandor Rp. 60,000.00 Rp. 162.00
Jumlah Rp. 48,729.00
Dibulatkan Rp. 48,000.00
SNI.DT-91-0009-2007-01
Memasang 1 M2 Dinding Bata Merah Tebal 1 Bata, Campuran 1PC : 2PP
0.0800 M3 Pasir Pasang Rp. 110,000.00 Rp. 8,800.00
140.0000 Bh Batu Bata Rp. 600.00 Rp. 84,000.00
43.5000 Kg Semen Portland @ 40 Kg Rp. 1,200.00 Rp. 52,200.00
0.6000 OH Pekerja Rp. 58,000.00 Rp. 34,800.00
0.2000 OH Tukang Rp. 58,000.00 Rp. 11,600.00
0.0200 OH Kepala Tukang Rp. 60,000.00 Rp. 1,200.00
0.0300 OH Mandor Rp. 60,000.00 Rp. 1,800.00
Jumlah Rp. 194,400.00
Dibulatkan Rp. 194,000.00
SNI.7394.2008-6.24
Memasang 1 M2 Bekisting untuk Plat Lantai
0.0400 M3 Kayu kelas III Rp. 3,800,000.00 = Rp. 152,000.00
0.4000 Kg Paku kayu Rp. 20,000.00 = Rp. 8,000.00
0.2000 Ltr Minyak bekisting Rp. 6,000.00 = Rp. 1,200.00
0.0150 M3 Balok Kayu Kelas II Rp. 4,000,000.00 = Rp. 60,000.00
0.3500 Lbr Plywood 9 mm Rp. 65,000.00 = Rp. 22,750.00
6.0000 Btg Dolken Kayu ø 8-10/4 m Rp. 20,000.00 = Rp. 120,000.00
0.6600 OH Pekerja Rp. 58,000.00 = Rp. 38,280.00
0.3300 OH Tukang Rp. 58,000.00 = Rp. 19,140.00
0.0330 OH Kepala Tukang Rp. 60,000.00 = Rp. 1,980.00
0.0330 OH Mandor Rp. 60,000.00 = Rp. 1,980.00
Jumlah = Rp. 425,330.00
Bekisting 2 x Pakai = x 0.5 Dibulatkan = Rp. 212,000.00
SNI 2835 : 2008 - 6.1
Menggali 1 M3 Tanah Biasa Sedalam 1 M
0.7500 OH Pekerja Rp. 58,000.00 = Rp. 43,500.00
0.0250 OH Mandor Rp. 60,000.00 = Rp. 1,500.00
Jumlah = Rp. 45,000.00
Dibulatkan = Rp. 45,000.00
SNI.2836.2008.69
1 M3 Pasangan Pondasi Batu Kosong/Aanstamping
1.2000 M3 Batu Kali/Batu Belah Rp. 105,000.00 = Rp. 126,000.00
0.4320 M3 Pasir Urug Rp. 100,000.00 = Rp. 43,200.00
0.7800 OH Pekerja Rp. 58,000.00 = Rp. 45,240.00
0.3900 OH Tukang Rp. 58,000.00 = Rp. 22,620.00
0.0390 OH Kepala Tukang Rp. 60,000.00 = Rp. 2,340.00
0.0390 OH Mandor Rp. 60,000.00 = Rp. 2,340.00
Jumlah = Rp. 241,740.00
Dibulatkan = Rp. 241,000.00
SNI.2837.2008.6.15
1 M2 Plesteran 1 PC : 4 PS, tebal 20 mm
8.3200 Kg Semen PC @ 40 kg Rp. 1,200.00 Rp. 9,984.00
0.0320 M3 Pasir Pasang Rp. 110,000.00 Rp. 3,520.00
0.4000 OH Pekerja Rp. 58,000.00 Rp. 23,200.00
0.2000 OH Tukang Rp. 58,000.00 Rp. 11,600.00
0.0200 OH Kepala Tukang Rp. 60,000.00 Rp. 1,200.00
0.0220 OH Mandor Rp. 60,000.00 Rp. 1,320.00
Jumlah Rp. 50,824.00
Dibulatkan Rp. 50,000.00
Anl.SNI.6.14-2002
1 M2 Pengecatan Tembok Baru (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
0.0630 Tukang (Kayu/Besi/Batu) Rp. 58,000.00 Rp. 3,654.00
0.0063 Kepala Tukang (Kayu/Besi/Batu) Rp. 60,000.00 Rp. 378.00
0.0025 Mandor Rp. 60,000.00 Rp. 150.00
0.0200 Pekerja Rp. 60,000.00 Rp. 1,200.00
0.2600 Cat Tembok Rp. 45,000.00 Rp. 11,700.00
0.1000 Cat Tembok Dasar Rp. 35,000.00 Rp. 3,500.00
0.1000 Plamir Tembok Rp. 30,000.00 Rp. 3,000.00
Jumlah Rp. 23,582.00
Dibulatkan Rp. 23,000.00
SNI.7394.2008.6.1
1 M3 Beton Mutu fc = 7,4 Mpa (K100), Slump (12 ± 2) cm, w/c = 0.87
247.0000 Kg Semen Portland @ 40 Kg Rp. 1,200.00 = Rp. 296,400.00
0.5200 M3 Pasir Beton Rp. 110,000.00 = Rp. 57,200.00
0.8700 M3 Kerikil Beton Rp. 110,000.00 = Rp. 95,700.00
1.6500 OH Pekerja Rp. 58,000.00 = Rp. 95,700.00
0.2500 OH Tukang Rp. 58,000.00 = Rp. 14,500.00
0.0250 OH Kepala Tukang Rp. 60,000.00 = Rp. 1,500.00
0.0800 OH Mandor Rp. 60,000.00 = Rp. 4,800.00
Jumlah = Rp. 565,800.00
Dibulatkan = Rp. 565,000.00