B PEKERJAAN TANAH
1 galian pondasi
2 urugan pasir bawah pondasi
3 urugan tanah kembali 1/3 galian
4 urugan tanah bawah lantai
5 urugan sirtu bawah lantai
C PEKERJAAN PASANGAN
1 pas. Anstamping
2 pas. Pondsi batu kali 1ps : 3pp
3 pas. Bata merah 1pc : 4ps
4 pas. Bata merah 1pc : 6ps
5 pas. Plesteran
6 pas. Acian
7 pas. Kramik Lantai 40x40
8 pas. Kramik Lantai kamar mandi 20x20
9 pas. Kramik dinding kamra mandi 25x40
D PEKERJAAN BETON
1 sloof
a. beton mutu f'c = 19,3 mpa
b. besi diameter 10mm
besi diameter 8mm
c. bekisting
2 kolom
a. beton mutu f'c = 19,3 mpa
b. besi diameter 10mm
besi diameter 8mm
c. bekisting
3 ringbalk
a. beton mutu f'c = 19,3 mpa
b. besi diameter 10mm
besi diameter 8mm
c. bekisting
4 topi-topi
a. beton mutu f'c = 19,3 mpa
b. besi diameter 8mm
c. bekisting
5 kolom gunungan
a. beton mutu f'c = 19,3 mpa
b. besi diameter 10mm
besi diameter 8mm
c. bekisting
6 beton latiu
a. beton mutu f'c = 19,3 mpa
b. besi diameter 10mm
besi diameter 8mm
c. bekisting
F PEKERJAAN ATAP
1 nok
2 papan ruiter
3 gording
4 murplat
5 pekerjaan rangka atap
6 genteng plentong super
7 kerpus
8 listplank
G PEKERJAAN LANGIT-LANGIT
1 pekerjaan rangka plafond
2 pasangan plafond
3 pasangan list plafond
J PEKERJAAN PENGECATAN
1 cat dinding interior
2 cat dinding exterior
3 cat kusen
4 cat daun pintu dan jendela
5 cat listplank
6 cat plafond
K PEKERJAAN SANITASI
1 closet duduk
2 keran 3/4
3 floor drain
pipa pvc 3''
pipa pvc 1,5''
septictank
bak kontrol
peresapan
pipa pvc 3/4
bak mandi
RAB RUMAH TINGGAL
30.00 ls Rp 13,225.00
22.00 ls Rp 90,056.50
42.66 m3 Rp 62,962.50
1.63 m3 Rp 245,985.00
14.22 m3 Rp 15,141.67
4.77 m3 Rp 105,685.00
0.95 m3 Rp 250,412.50
6.50 m3 Rp 462,679.50
14.30 m3 Rp 886,213.00
62.16 m2 Rp 278,794.50
99.83 m2 Rp 277,030.40
199.66 m2 Rp 55,618.69
199.66 m2 Rp 31,671.00
27.75 m2 Rp 144,083.50
2.25 m2 Rp 211,781.70
8.15 m2 Rp 213,691.85
0.98 m3 Rp 1,103,755.67
81.84 kg Rp 13,732.15
50.62 kg Rp 13,732.15
13.2 m2 Rp 96,174.50
0.82 m3 Rp 1,103,755.67
37.82 kg Rp 13,732.15
46.63 kg Rp 13,732.15
21.96 m2 Rp 127,535.00
0.73 m3 Rp 1,103,755.67
80.60 kg Rp 13,732.15
34.65 kg Rp 13,732.15
14.63 m2 Rp 104,929.45
0.04 m3 Rp 1,103,755.67
5.46 kg Rp 13,732.15
0.54 m2 Rp 104,929.45
0.11 m3 Rp 1,103,755.67
11.90 kg Rp 13,732.15
4.87 kg Rp 13,732.15
1.44 m2 Rp 127,535.00
0.48 m3 Rp 1,103,755.67
41.04 kg Rp 13,732.15
25.39 kg Rp 13,732.15
6.62 m2 Rp 127,535.00
0.39 m3 Rp 16,990,675.00
11.35 m2 Rp 656,765.00
7.14 m2 Rp 951,050.00
3.02 m2 Rp 146,477.80
1.00 Bh Rp 608,313.20
1 Bh Rp 284,222.50
3 Bh Rp 146,222.50
15 Bh Rp 47,290.30
6 Bh Rp 29,606.75
6 Bh Rp 36,535.50
6 Bh Rp 139,713.50
5.95 m1 Rp 191,118.50
5.85 m3 Rp 162,805.50
0.09 m3 Rp 14,432,845.00
0.06 m3 Rp 14,432,845.00
43.80 m2 Rp 235,738.50
43.80 m2 Rp 104,385.50
1.20 m1 Rp 114,305.40
1.20 m1 Rp 162,805.50
31.00 m3 Rp 242,661.50
31.00 m3 Rp 51,600.50
38.50 m3 Rp 28,715.50
6 Bh Rp 55,000.00
2 Bh Rp 16,000.000
2 Bh Rp 21,400.000
2 Bh Rp 18,100.000
1 Bh Rp 50,000.000
117.80 m2 Rp 33,419.00
68.20 m2 Rp 43,355.00
18.18 m2 Rp 43,976.00
40.99 m2 Rp 43,976.00
2.40 m2 Rp 43,976.00
31.00 m2 Rp 21,585.50
Rp 396,750.00
Rp 1,981,243.00
Rp 2,377,993.00
Rp 2,685,744.14
Rp 399,725.63
Rp 215,295.57
Rp 504,117.45
Rp 238,893.53
Rp 4,043,776.31
Rp 3,007,416.75
Rp 12,672,845.90
Rp 17,328,750.94
Rp 27,656,221.86
Rp 11,104,939.28
Rp 6,323,495.20
Rp 3,998,317.13
Rp 476,508.83
Rp 1,741,802.27
Rp 84,310,298.16
Rp 1,076,161.78
Rp 1,123,839.16
Rp 695,148.90
Rp 1,269,503.40
Rp 908,942.79
Rp 519,349.91
Rp 640,308.18
Rp 2,800,668.60
Rp 807,121.33
Rp 1,106,811.29
Rp 475,750.34
Rp 1,534,593.21
Rp 41,721.96
Rp 74,977.54
Rp 56,661.90
Rp 119,205.61
Rp 163,467.51
Rp 66,837.12
Rp 183,650.40
Rp 531,458.36
Rp 563,622.36
Rp 348,627.70
Rp 844,281.70
Rp 15,952,711.07
Rp 6,618,207.73
Rp 7,456,909.81
Rp 6,790,497.00
Rp 441,923.52
Rp 608,313.20
Rp 284,222.50
Rp 438,667.50
Rp 709,354.50
Rp 177,640.50
Rp 219,213.00
Rp 838,281.00
Rp 24,583,230.26
Rp 1,137,155.08
Rp 952,412.18
Rp 1,236,606.16
Rp 822,672.17
Rp 10,325,346.30
Rp 4,572,084.90
Rp 137,166.48
Rp 195,366.60
Rp 19,378,809.85
Rp 7,522,506.50
Rp 1,599,615.50
Rp 1,105,546.75
Rp 10,227,668.75
Rp 330,000.00
Rp 32,000.00
Rp 42,800.00
Rp 36,200.00
Rp 50,000.00
Rp 491,000.00
Rp 3,936,758.20
Rp 2,956,811.00
Rp 799,378.14
Rp 1,802,488.29
Rp 105,542.40
Rp 669,150.50
Rp 10,270,128.53
Rp 2,822,560.00
Rp 140,000.00
Rp 103,672.50
Rp 289,912.70
Rp 167,049.00
Rp 4,000,000.00
Rp 1,309,390.00
Rp 1,000,000.00
Rp 276,872.08
Rp 2,428,800.00
Rp 12,538,256.28
Rp 184,173,872.21
AHS AHS
No Jenis Pekerja Keb. Volume
Sat Keb. Tenaga
Tenaga
1 2 3 4 5 6.00
(3*5 )
1 pembersihan lahan 0.1 OH 30.00 3.00
2 pas. Bowplank 0.1 OH 22.00 2.20
0.1 OH 22.00 2.20
3 galian pondasi 0.75 OH 42.66 31.99
4 urugan pasir bawah pondasi 0.3 OH 1.63 0.49
5 urugan tanah kembali 1/3 galian 0.5 OH 14.22 7.11
6 urugan tanah bawah lantai 0.1 OH 4.77 0.48
7 urugan sirtu bawah lantai 0.25 OH 0.95 0.24
pas. Anstamping 0.78 OH 6.50 5.07
0.39 OH 6.50 2.54
pas. Pondsi batu kali 1ps : 3pp 1.5 OH 14.30 21.45
0.75 OH 14.30 10.73
pas. Bata merah 1pc : 4ps 0.6 OH 62.16 37.29
0.2 OH 62.16 12.43
pas. Bata merah 1pc : 6ps 0.6 OH 99.83 59.90
0.2 OH 99.83 19.97
pas. Plesteran 0.3 OH 199.66 59.90
0.15 OH 199.66 29.95
pas. Acian 0.2 OH 199.66 39.93
0.1 OH 199.66 19.97
pas. Kramik Lantai 40x40 0.25 OH 27.75 6.94
0.125 OH 27.75 3.47
pas. Kramik Lantai kamar mandi 20x20 0.7 OH 2.25 1.58
0.35 OH 2.25 0.79
pas. Kramik dinding kamra mandi 25x40 0.45 OH 8.15 3.67
0.225 OH 8.15 1.83
sloof
a. beton mutu f'c = 19,3 mpa 1.65 OH 0.98 1.61
0.275 OH 0.98 0.27
b.pekerjaan besi 0.07 OH 132.46 9.27
0.07 OH 132.46 9.27
c. bekisting 0.171 OH 13.20 2.26
0.24 OH 13.20 3.17
kolom 0.00
a. beton mutu f'c = 19,3 mpa 1.65 OH 0.82 1.36
0.275 OH 0.82 0.23
b.pekerjaan besi 0.07 OH 84.45 5.91
0.07 OH 84.45 5.91
c. bekisting 0.24 OH 21.96 5.27
0.3 OH 21.96 6.59
ringbalk 0.00
a. beton mutu f'c = 19,3 mpa 0.297 OH 0.73 0.22
0.033 OH 0.73 0.02
b.pekerjaan besi 0.033 OH 115.25 3.80
c. bekisting 0.033 OH 14.63 0.48
topi-topi 0.00
a. beton mutu f'c = 19,3 mpa 1.65 OH 0.04 0.06
0.275 OH 0.04 0.01
b.pekerjaan besi 0.07 OH 5.46 0.38
0.07 OH 5.46 0.38
c. bekisting 0.3 OH 0.54 0.16
kolom gunungan 0.00
a. beton mutu f'c = 19,3 mpa 1.65 OH 0.11 0.18
0.275 OH 0.11 4.61
b.pekerjaan besi 0.07 OH 16.77 1.17
0.07 OH 16.77 1.17
c. bekisting 0.24 OH 1.44 0.35
0.3 OH 1.44 0.43
beton latiu 0.00
a. beton mutu f'c = 19,3 mpa 1.65 OH 0.48 0.79
0.275 OH 0.48 0.13
b.pekerjaan besi 0.07 OH 66.43 4.65
0.07 OH 66.43 4.65
c. bekisting 0.24 OH 6.62 1.59
0.3 OH 6.62 1.99
pek. Kusen pintu dan jendela 6 OH 0.39 2.34
18 OH 0.39 7.01
pek. Rangka daun jendela 0.8 OH 11.35 9.08
2.4 OH 11.35 27.25
pek. Daun pintu 1 OH 7.14 7.14
3 OH 7.14 21.42
kaca 5mm 0.015 OH 3.02 0.05
0.15 OH 3.02 0.45
pintu pvc 1.05 OH 1.00 1.05
1.05 OH 1.00 1.05
pas. Kunci pintu utama tanam 0.01 OH 1.00 0.01
0.5 OH 1.00 0.50
pas. Kunci pintu biasa tanam 0.01 OH 3.00 0.03
0.5 OH 3.00 1.50
pas. Engsel pintu 0.015 OH 15.00 0.23
0.5 OH 15.00 7.50
pas. Engsel jendela 0.01 OH 6.00 0.06
0.1 OH 6.00 0.60
pas.kait angin 0.015 OH 6.00 0.09
0.15 OH 6.00 0.90
pas.kunci grandel 0.02 OH 6.00 0.12
0.2 OH 6.00 1.20
nok 0.125 OH 5.95 0.74
0.25 OH 5.95 1.49
papan ruiter 0.1 OH 5.85 0.59
0.2 OH 5.85 1.17
gording 2.4 OH 0.09 0.21
7.2 OH 0.09 0.62
murplat 2.4 OH 0.06 0.14
7.2 OH 0.06 0.41
pekerjaan rangka atap 0.1 OH 43.80 4.38
0.1 OH 43.80 4.38
genteng plentong super 0.15 OH 43.80 6.57
0.075 OH 43.80 3.29
kerpus 0.4 OH 1.20 0.48
0.2 OH 1.20 0.24
listplank 0.1 OH 1.20 0.12
0.2 OH 1.20 0.24
pekerjaan rangka plafond 0.15 OH 31.00 4.65
0.3 OH 31.00 9.30
pasangan plafond 0.1 OH 31.00 3.10
0.05 OH 31.00 1.55
pasangan list plafond 0.05 OH 38.50 1.93
0.05 OH 38.50 1.93
cat dinding interior 0.02 OH 117.80 2.36
0.063 OH 117.80 7.42
cat dinding exterior 0.02 OH 68.20 1.36
0.063 OH 68.20 4.30
cat kusen 0.07 OH 18.18 1.27
0.009 OH 18.18 0.16
cat daun pintu dan jendela 0.07 OH 40.99 2.87
0.009 OH 40.99 0.37
cat listplank 0.07 OH 2.40 0.17
0.009 OH 2.40 0.02
cat plafond 0.06 OH 31.00 1.86
0.08 OH 31.00 2.48
closet duduk 3.3 OH 1.00 3.30
1.1 OH 1.00 1.10
floor drain 0.01 OH 1.00 0.01
0.1 OH 1.00 0.10
pipa pvc 3'' 0.081 OH 2.20 0.18
0.135 OH 2.20 0.30
pipa pvc 1,5'' 0.054 OH 3.00 0.16
0.09 OH 3.00 0.27
bak kontrol 3.2 OH 2.00 6.40
1.15 OH 2.00 2.30
pipa pvc 3/4 0.054 OH 5.00 0.27
0.09 OH 5.00 0.45
bak mandi 3 OH 1.00 3.00
4.5 OH 1.00 4.50
0.00
0.00
0.00
0.00
Jumlah
AHS
Bobot Keterangan
Sat
7 8 9
jumlah
volume koefisien
NO jenis pekerjaan satuan (v) tenaga (k) tenaga
(n)
1 2 3 4 5 6
A PEKERJAAN PERSIAPAN
1 pembersihan lahan m2 30.00 0.1 3
2 pas. Bowplank m 22.00 0.1 4
0.1
B PEKERJAAN TANAH
1 galian pondasi m3 42.66 0.75 32
2 urugan pasir bawah pondasi m3 1.63 0.3 0.49
3 urugan tanah kembali 1/3 galian m3 14.22 0.5 7
4 urugan tanah bawah lantai m3 4.77 0.1 0.48
5 urugan sirtu bawah lantai m3 0.95 0.25 0.24
C PEKERJAAN PASANGAN
1 pas. Anstamping m3 6.50 0.78 8
0.39
2 pas. Pondsi batu kali 1ps : 3pp m3 14.30 1.5 32
0.75
3 pas. Bata merah 1pc : 4ps m2 62.16 0.6 50
0.2
4 pas. Bata merah 1pc : 6ps m2 99.83 0.6 80
0.2
5 pas. Plesteran m2 199.66 0.3 90
0.15
6 pas. Acian m2 199.66 0.2 60
0.1
7 pas. Kramik Lantai 40x40 m2 27.75 0.25 10
0.125
8 pas. Kramik Lantai kamar mandi 20x20 m2 2.25 0.7 2
0.35
9 pas. Kramik dinding kamra mandi 25x40 m2 8.15 0.45 6
0.225
D PEKERJAAN BETON
1 sloof
a. beton mutu f'c = 19,3 mpa m3 0.98 1.65 2
0.275
b. besi diameter 10mm kg 132.46 0.07 19
0.07
c. bekisting m2 13.20 0.171 5
0.24
2 kolom
a. beton mutu f'c = 19,3 mpa m3 0.82 1.65 2
0.275
b. besi diameter 10mm kg 84.45 0.07 12
0.07
c. bekisting m2 21.96 0.24 12
0.3
3 ringbalk
a. beton mutu f'c = 19,3 mpa m3 0.73 0.297 1
0.033
b. besi diameter 10mm kg 115.25 0.033 4
c. bekisting m2 14.63 0.033 1
4 topi-topi
a. beton mutu f'c = 19,3 mpa m3 0.04 1.65 1
0.275
b. besi diameter 8mm kg 5.46 0.07 1
m2 0.07
c. bekisting 0.54 0.3 1
5 kolom gunungan
a. beton mutu f'c = 19,3 mpa m3 0.11 1.65 1
0.275
b. besi diameter 10mm kg 16.77 0.07 2
0.07
c. bekisting m2 1.44 0.24 1
0.3
6 beton latiu
a. beton mutu f'c = 19,3 mpa m3 0.48 1.65 1
0.275
b. besi diameter 10mm kg 66.43 0.07 9
0.07
c. bekisting m2 6.62 0.24 4
0.3
E PEKERJAAN PINTU DAN JENDELA
1 pek. Kusen pintu dan jendela m3 0.39 6 9
18
2 pek. Rangka daun jendela m2 11.35 0.8 36
2.4
3 pek. Daun pintu m2 7.14 1 29
3
4 kaca 5mm m2 3.02 0.015 1
0.15
5 pintu pvc bh 1.00 1.05 2
1.05
6 pas. Kunci pintu utama tanam bh 1.00 0.01 1
0.5
7 pas. Kunci pintu biasa tanam bh 3.00 0.01 2
0.5
8 pas. Engsel pintu bh 15.00 0.015 8
0.5
9 pas. Engsel jendela bh 6.00 0.01 1
0.1
10 pas.kait angin bh 6.00 0.015 1
0.15
11 pas.kunci grandel bh 6.00 0.02 1
0.2
F PEKERJAAN ATAP
1 nok m 5.95 0.125 2
0.25
2 papan ruiter m 5.85 0.1 2
0.2
3 gording m3 0.09 2.4 1
7.2
4 murplat m3 0.06 2.4 1
7.2
5 pekerjaan rangka atap m2 43.80 0.1 9
0.1
6 genteng plentong super m2 43.80 0.15 10
0.075
7 kerpus m 1.20 0.4 1
0.2
8 listplank m 1.20 0.1 1
0.2
G PEKERJAAN LANGIT-LANGIT
1 pekerjaan rangka plafond m2 31.00 0.15 14
0.3
2 pasangan plafond m2 31.00 0.1 5
0.05
3 pasangan list plafond m 38.50 0.05 4
0.05
J PEKERJAAN PENGECATAN
1 cat dinding interior m2 117.80 0.02 10
0.063
2 cat dinding exterior m2 68.20 0.02 6
0.063
3 cat kusen m2 18.18 0.07 1
0.009
4 cat daun pintu dan jendela m2 40.99 0.07 3
0.009
5 cat listplank m2 2.40 0.07 1
0.009
6 cat plafond m2 31.00 0.06 4
0.08
K PEKERJAAN SANITASI
1 closet duduk bh 1.00 3.3 4
1.1
2 floor drain bh 1.00 0.01 1
0.1
3 pipa pvc 3'' m 2.20 0.081 1
0.135
4 pipa pvc 1,5'' m 3.00 0.054 1
0.09
5 bak kontrol bh 2.00 3.2 9
1.15
6 pipa pvc 3/4 m 5.00 0.054 1
0.09
7 bak mandi bh 1.00 3 8
4.5
waktu pelaksanaan (t) produktivitas (p)
7 8.00
1 10.00
1 5.00
1 1.33
1.0 3.33
1 2.00
1 10.00
1 4.00
1 0.85
1 0.44
1 1.25
1 1.25
1 2.22
1 3.33
1 2.67
1 0.95
1 1.48
1 0.52
1 7.14
1 2.43
1 0.52
1 7.14
1 1.85
1 0.73
1 30.30
1 14.63
1 0.04
1 7.14
1 0.54
1 0.11
1 7.14
1 1.85
1 0.52
1 7.14
1 1.85
1 0.04
1 0.31
1 0.25
1 3.02
1 0.48
1 1.96
1 1.96
1 1.94
1 9.09
1 6.06
1 4.55
1 2.67
1 3.33
1 0.10
1 0.10
1 5.00
1 4.44
1 1.67
1 1.20
1 2.22
1 6.67
1 10.00
1 12.05
1 12.05
1 12.66
1 12.66
1 2.40
1 7.14
1 0.23
1 1.00
1 2.20
1 3.00
1 0.23
1 6.94
1 0.13
DAFTAR HAR GA SAT UAN PE K E R JAAN G E D U N G
DAERAH BAWAH
ERAH BAWAH
HARGA SATUAN
SAT PEKERJAAN
(Rp)
m' 90,056.50
m2 13,225.00
###
###
m3 62,962.50
m3 15,141.67
m3 245,985.00
m3 250,412.50
m3 105,685.00
HARGA SATUAN
SAT PEKERJAAN
(Rp)
###
###
m3 886,213
m3 462,679.50
###
###
m3 1,103,755.67
kg 13,732.15
m2 96,174.50
m2 127,535.00
m' 104,929.45
HARGA SATUAN
SAT PEKERJAAN
(Rp)
###
###
m2 278,794.50
m2 277,030.40
###
###
m2 55,618.69
m2 31,671.00
###
###
m2 144,083.50
m2 211,781.70
m2 213,691.85
###
###
m2 51,600.50
m' 28,715.50
###
###
m2 104,385.50
m2 114,305.40
m' 191,118.50
###
###
m3 16,990,675.00
m2 951,050.00
m2 656,765.00
m3 14,432,845.00
m2 235,738.50
m2 242,661.50
m' 162,805.50
###
###
bh 284,222.50
bh 146,222.50
bh 47,290.30
bh 29,606.75
bh 36,535.50
bh 139,713.50
m2 146,477.80
bh 608,313.20
###
###
DAFTAR HARGA SATUAN BAHAN
HARGA
NO. J E N I S B A H A N SATUAN BAWAH
(Rp)
IB A H A N D A S A R
1 BATU KALI Bulat Utuh m3 188,000.00
Belah m3 200,000.00
Pecah 3/5 m3 245,000.00
2 KERIKIL Timbun m3 200,000.00
Abu batu m3 260,000.00
4 PASIR Urug m3 160,000.00
Pasang m3 258,000.00
Beton m3 412,000.00
Sirtu m3 165,000.00
5 TANAH Urug m3 80,000.00
Liat/Merah m3 95,000.00
6 KAPUR Pasang m3 215,000.00
7 PORTLAND CEMENT
40 kg zak 44,800.00
50 kg zak 56,000.00
Semen Putih 40 kg zak 90,000.00
Semen Putih 50 kg zak 100,000.00
Semen warna kg 18,000.00
8 Semen Instant (acian) Kg 3,375.00
9 Semen Instant (perekat bata ringan/Plesteran) Kg 2,250.00
10 Semen Instant (perekat keramik) Kg 4,000.00
11 Semen Grouting Kg 6,000.00
12 Batu Granit (untuk plesteran) Kg 6,000.00
13 Bahan tambahan kimia Beton Ltr 66,000.00
II B A H A N PENUTUP ATAP
1 SIRAP (Bitumen) m2 185,000.00
HARGA
NO. J E N I S B A H A N SATUAN BAWAH
(Rp)
2 GENTENG BETON
Genteng Beton Warna standard bh 6,500.00
Genteng Beton Warna Special bh 8,000.00
Genteng Beton Warna Khusus bh 6,500.00
Kerpus Beton Warna Standard bh 6,000.00
Kerpus Beton Warna Special bh 7,500.00
Kerpus Beton Warna Khusus bh 12,000.00
3 GENTENG TANAH LIAT
plentong kecil bh 2,800.00
Kodok bh 2,700.00
Nok kerpus Kodok bh 6,000.00
Keramik Glasur (Kanmuri) bh 11,000.00
Nok Genteng Keramik bh 30,000.00
Plentong Besar/super (isi 12 bh/m2 bh 6,000.00
Plentong (isi 20 bh/m2) bh 3,000.00
Plentong super Glazur bh 3,800.00
Nok kerpus plentong Glazur bh 8,500.00
4 GENTENG KACA
Vlaam tebal 2 mm bh 8,500.00
Vlaam tebal 3 mm bh 9,500.00
Kodok tebal 2 mm bh 10,250.00
Kodok tebal 3 mm bh 12,625.00
5 ASBES GELOMBANG BESAR
. 180 cm X 102 cm X 5 mm bh 65,000.00
. 200 cm X 102 cm X 5 mm bh 72,000.00
. 225 cm X 102 cm X 5 mm bh 77,500.00
. 250 cm X 102 cm X 5 mm bh 86,250.00
. 210 cm X 108 cm X 6 mm bh 85,000.00
. 240 cm X 108 cm X 6 mm bh 95,000.00
. 270 cm X 108 cm X 6 mm bh 110,000.00
HARGA
NO. J E N I S B A H A N SATUAN BAWAH
(Rp)
6 ASBES GELOMBANG KECIL
. 150 cm X 105 cm X 4 mm bh 44,500.00
. 180 cm X 105 cm X 4 mm bh 49,000.00
. 210 cm X 105 cm X 4 mm bh 56,500.00
. 240 cm X 105 cm X 4 mm bh 68,500.00
. 270 cm X 105 cm X 4 mm bh 74,000.00
. 300 cm X 105 cm X 4 mm bh 82,000.00
7 NOK Jabes nok
. Kerpus Genteng bh 31,428.57
. Stel Besar bh 43,000.00
. Paten Besar bh 40,000.00
Nokstel gelombang harflex
. Stel Besar bh 42,000.00
. Patent Besar bh 25,000.00
. Plat besar bh 49,000.00
genteng metal butir pasir M1 55,000.00
genteng bitumen m1 110,000.00
8 FIBRE GLASS (JABES)
180 X 92 cm bh 65,000.00
200 X 92 cm bh 75,000.00
250 X 92 cm bh 85,000.00
180 X 105 cm bh 77,000.00
210 X 105 cm bh 85,000.00
250 X 105 cm bh 98,000.00
9 SENG PLAT
BJLS 0,18 lebar 55 cm m' 21,000.00
BJLS 0,20 lebar 55 cm m' 29,000.00
BJLS 0,28 lebar 55 cm m' 37,000.00
BJLS 0,30 lebar 55 cm m' 42,000.00
10 SENG GELOMBANG
BJLS 0,18 panjang 180 cm lbr 52,000.00
BJLS 0,20 panjang 180 cm lbr 58,000.00
BJLS 0,30 panjang 180 cm lbr 67,000.00
BJLS 0,40 panjang 180 cm lbr 75,000.00
11 Genteng metal pasir per m m2 65,000.00
12 Genteng bitumen motif genteng uk. 40 X 106 cm lbr 55,000.00
HARGA
NO. J E N I S B A H A N SATUAN BAWAH
(Rp)
13 Genteng bitumen (line/gelombang) uk. 95 X 200 cm lbr 176,000.00
14 Atap Galvalume m2 62,000.00
15 Roof light fiberglass lbr 90,000.00
16 Aluminium gel. tebal 0,55 lbr 100,000.00
17 Alumunium Foil m2 8,000.00
V BAHAN CETAK
1 BUIS BETON
Ø 20 cm - 100 cm bh 47,500.00
Ø 30 cm - 100 cm bh 75,000.00
Ø 40 cm - 100 cm bh 92,500.00
Ø 50 cm - 50 cm bh 140,000.00
Ø 60 cm - 50 cm bh 185,000.00
U 20 cm - 100 cm bh 45,000.00
HARGA
NO. J E N I S B A H A N SATUAN BAWAH
(Rp)
U 30 cm - 100 cm bh 80,000.00
2 U-DITCH
30.40.120 bh 337,000.00
40.60.120 bh 508,000.00
50.50.120 bh 575,000.00
60.80.120 bh 913,000.00
80.80.120 bh 1,206,000.00
100.100.120 bh 1,842,000.00
120.120.120 bh 2,286,000.00
3 TUTUP U-DITCH
Light 30 bh 185,000.00
Light 40 bh 228,000.00
Light 50 bh 321,000.00
Light 60 bh 448,000.00
Light 80 bh 507,000.00
Light 100 bh 670,000.00
Light 120 bh 840,000.00
Heavy 80 bh 1,446,000.00
Heavy 100 bh 2,097,000.00
4 LUBANG ANGIN (ROSTER) PC + PASIR
10 X 20 cm bh 7,000.00
20 X 20 cm bh 8,000.00
25 X 25 cm bh 11,000.00
30 X 30 cm bh 15,000.00
15 X 25 cm bh 10,000.00
15 X 30 cm bh 12,000.00
5 TIANG PANCANG BETON
□ 20 cm m 203,000.00
□ 25 cm m 297,000.00
Ø 30 cm m 320,000.00
Ø 40 cm m 517,000.00
Ø 50 cm m 774,000.00
Ø 60 cm m 1,021,000.00
VI B A H A N B E S I
1 BESI BETON besi beton polos kg 10,000.00
HARGA
NO. J E N I S B A H A N SATUAN BAWAH
(Rp)
besi beton ulir kg 10,500.00
2 Kabel prategang (prestressed) polos/strands kg 10,500.00
3 BESI PLAT Besi Strip kg 10,500.00
4 BESI PROFIL Besi Profil kg 10,500.00
5 JARING - JARING BAJA
Kawat Bronjong kg 21,700.00
6 KAWAT - Ikat beton/bendrat kg 19,000.00
- Harmonika 12 X 45 mm m2 27,500.00
- Harmonika 12 X 24 mm m2 27,500.00
- Harmonika 14 X 30 mm m2 58,000.00
- Harmonika 14 X 35 mm m2 58,000.00
- Kawat Galvanis 4 mm Kg 35,000.00
- Kawat Nyamuk Nylon m2 19,000.00
- Kawat Kasa m2 20,000.00
- Saringan pasir m2 15,000.00
- Kawat loket m2 18,000.00
- Kawat duri galvanis (30 m/rol) rol 194,250.00
- Kawat las listrik kg 32,250.00
- Kawat Jaring Baja kg 15,400.00
7 Besi hollow/metal furing
□ 20.40.400 Btg 22,000.00
□ 40.40.400 Btg 32,000.00
8 Sliding Pintu bh 235,000.00
9 Naco per Daun bh 20,000.00
10 Rolling door Besi m2 325,000.00
11 Rolling door Almunium m2 450,000.00
12 Pintu Lipat Besi (folding gate) m2 450,000.00
13 Awning Galvalum m2 300,000.00
14 Kusen Almunium 4" natural, Kw. B m' 80,000.00
15 Kusen Almunium 4" warna, Kw. B m' 90,000.00
16 Kusen Almunium 4" natural, Kw. A m' 150,000.00
17 Kusen Almunium 4" warna, Kw. A m' 170,000.00
18 profil Almunium natural m' 90,000.00
19 profil Almunium warna m' 100,000.00
20 Pagar BRC. Pagar BRC 90 A2 /lb 315,000.00
Pagar BRC 120 A2 /lb 395,000.00
HARGA
NO. J E N I S B A H A N SATUAN BAWAH
(Rp)
Pintu BRC SG 120 T1 /lb 1,250,000.00
21 Sunscreen Allumunim m2 375,000.00
22 Paku Sekrup hollow Kg 41,900.00
23 Baja ringan canai dingin C75 m' 13,300.00
HARGA
NO. J E N I S B A H A N SATUAN BAWAH
(Rp)
VII B A H A N P I P A
1 Pipa PVC - 10 bar
Pipa PVC DN 20 ( ½" ) Type AW btg 23,300.00
Pipa PVC DN 25 ( ¾" ) Type AW btg 31,700.00
Pipa PVC DN 32 ( 1" ) Type AW btg 43,300.00
Pipa PVC DN 40 ( 1½" ) Type S btg 140,400.00
Pipa PVC DN 63 ( 2" ) Type S btg 178,200.00
Pipa PVC DN 90 ( 3" ) Type S btg 373,200.00
Pipa PVC DN 110 ( 4" ) Type S btg 541,800.00
Pipa PVC DN 160 ( 6" ) Type S btg 1,161,600.00
Pipa PVC DN 200 ( 8" ) Type S btg 1,833,000.00
Pipa PVC DN 250 ( 10" ) Type S btg 2,860,800.00
Pipa PVC DN 315 ( 12" ) Type S btg 4,569,600.00
VIII B A H A N L A N G I T - L A N G I T
1 AKUSTIK-uk : 30 X 30 lbr 6,000.00
30 X 60 lbr 14,500.00
HARGA
NO. J E N I S B A H A N SATUAN BAWAH
(Rp)
60 X 120 lbr 45,600.00
2 List Kayu Profil m' 12,000.00
3 SOFT BOARD-uk: 4'X 8'
Gypsum tebal 9 mm lbr 75,000.00
4 HARD BOARD-uk: tebal 4mm lbr 80,000.00
5 List gypsum m 15,000.00
6 Tepung gypsum/Casting kg 3,000.00
7 ASBES PLAT
. 100cm X 100 cm X 3 mm bh 18,000.00
. 100cm X 100 cm X 4 mm bh 20,000.00
. 100cm X 100 cm X 5 mm bh 22,000.00
. 100cm X 100 cm X 6 mm bh 29,000.00
. 50 cm X 200 cm X 3 mm bh 18,000.00
. 40 cm X 200 cm X 3 mm bh 16,000.00
8 FIBER PLAT uk. 100cm x 100cm x 4mm lbr 25,000.00
uk. 120cm x 240cm x 4mm lbr 80,000.00
uk. 122cm x 244cm x 4mm lbr 85,000.00
9 GRC BOARD uk.122cm x 244cm x 5mm lbr 105,000.00
uk.122cm x 244cm x 6mm lbr 130,000.00
uk.122cm x 244cm x 8mm lbr 220,000.00
uk.122cm x 244cm x 10mm lbr 290,000.00
IX B A H A N F I N I S H I N G
1 KAYU
Menie kg 22,500.00
Dempul plamur kg 25,000.00
Ambril/amplas lbr 4,000.00
Batu Apung kg 30,000.00
Cat dasar kg 40,000.00
Cat Emco kg 59,000.00
Cat Yunior 66 (nippon paint) kg 55,000.00
Kuas bh 17,000.00
Deculux kg 90,000.00
Siralax ons 14,400.00
Spiritus ltr 13,000.00
Plitur jadi ltr 59,800.00
HARGA
NO. J E N I S B A H A N SATUAN BAWAH
(Rp)
Wood filler kg 40,000.00
Woodstain kg 70,000.00
Sanding kg 60,000.00
Melamic kg 60,000.00
HARGA
NO. J E N I S B A H A N SATUAN BAWAH
(Rp)
2 TEMBOK
Kalkarium kg 5,000.00
Kapur sirih kg 4,000.00
Plamur kg 30,000.00
Cat Tembok klas B exterior (ex. Catylac) kg 38,000.00
Cat Tembok klas A exterior (ex. Dulux/Propan, Mowilex) kg 76,000.00
Cat Tembok klas B interior (ex. Catylac) kg 25,000.00
Cat Tembok klas A interior (ex. Dulux) kg 52,000.00
Cat Genteng klas A kg 85,500.00
Cat Genteng klas B kg 49,000.00
Cat Batu Alam kg 74,000.00
Cat Kayu klas B (ex. Avian) kg 52,500.00
Cat Kayu klas A (ex. Emco) kg 60,600.00
3 BESI
Menie kg 27,000.00
Cat mengkilat kg 52,000.00
Cat kg 52,000.00
Thinner A ltr 21,000.00
Minyak cat ltr 15,000.00
Thinner Super ltr 25,000.00
Residu (teer/aspal) ltr 12,000.00
X BAHAN KACA
1 POLOS 3 mm m2 80,000.00
5 mm m2 97,500.00
8 mm m2 210,000.00
12 mm m2 295,000.00
2 ES KABUR 3 mm m2 85,000.00
5 mm m2 100,000.00
3 RAYBAND 3 mm m2 80,000.00
5 mm m2 100,000.00
4 TEMPERED 6 mm m2 291,500.00
8 mm m2 423,500.00
10 mm m2 451,000.00
12 mm m2 506,000.00
HARGA
NO. J E N I S B A H A N SATUAN BAWAH
(Rp)
5 CERMIN
3 mm m2 85,000.00
5 mm m2 125,000.00
8 mm m2 210,000.00
6 Wireglassed tebal 5 mm m2 250,000.00
7 Kaca patri tebal 5 mm m2 420,000.00
1 KABEL LISTRIK
NYA : . 1 X 1 1/2 mm2 m' 3,500.00
SPLN LMK 1 X 2 1/2 mm2 m' 4,000.00
. 1X4 mm2 m' 6,100.00
1X6 mm2 m' 8,900.00
NYY :. 2 X 1 1/2 mm2 m' 9,000.00
PRIMA 2 X 2 1/2 mm2 m' 15,500.00
. 2X4 mm2 m' 28,000.00
2X6 mm2 m' 36,000.00
3 X 1 1/2 mm2 m' 13,800.00
3 X 2 1/2 mm2 m' 21,000.00
3X4 mm2 m' 36,000.00
3X6 mm2 m' 53,000.00
NYM :. 2 X 1 1/2 mm2 m' 7,200.00
PRIMA 2 X 2 1/2 mm2 m' 11,500.00
. 2X4 mm2 m' 23,000.00
3 X 1 1/2 mm2 m' 13,500.00
3 X 2 1/2 mm2 m' 21,000.00
3X4 mm2 m' 31,000.00
3X6 mm2 m' 45,000.00
2 SAKLAR
Out bauw . Seri bh 17,000.00
. Engkel bh 12,000.00
In bauw . Doubel bh 20,000.00
. Tunggal bh 15,000.00
3 FUSE BOX (SEKERING KASA)
1 group bh 140,000.00
HARGA
NO. J E N I S B A H A N SATUAN BAWAH
(Rp)
2 group bh 230,000.00
3 group bh 330,000.00
HARGA
NO. J E N I S B A H A N SATUAN BAWAH
(Rp)
4 STEKER - Biasa bh 12,000.00
Arde bh 17,000.00
T Biasa bh 15,000.00
T dengan Arde bh 20,000.00
5 FITTING Flaon bh 8,250.00
Gantung bh 10,000.00
Kap bh 15,000.00
Kombinasi bh 150,000.00
6 STOP KONTAK - Arde Outbow putih bh 15,000.00
Arde Outbow hitam bh 8,000.00
Arde IB bh 17,000.00
Arde Putar bh 40,000.00
7 POMPA AIR LISTRIK
Sanyo 125 watt bh 450,000.00
Fuji 250 watt bh 975,000.00
Shimizu . 100 watt bh 400,000.00
. 90 watt bh 400,000.00
Dab . 125 watt bh 500,000.00
KABUPATEN PEKALONGAN
HARGA HARGA
ATAS EKSTREM
(Rp) (Rp)
197,000.00 201,000.00
210,000.00 214,000.00
257,000.00 262,000.00
210,000.00 214,000.00
273,000.00 278,000.00
168,000.00 171,000.00
270,000.00 276,000.00
432,000.00 440,000.00
173,000.00 176,000.00
84,000.00 85,600.00
99,000.00 101,000.00
225,700.00 230,000.00
46,400.00 48,000.00
58,000.00 60,000.00
94,000.00 98,000.00
105,000.00 107,000.00
19,000.00 20,000.00
3,500.00 3,600.00
2,300.00 2,400.00
4,200.00 4,200.00
6,300.00 6,400.00
6,300.00 6,400.00
69,300.00 70,600.00
194,200.00 197,900.00
HARGA HARGA
ATAS EKSTREM
(Rp) (Rp)
6,800.00 6,900.00
8,400.00 8,500.00
6,800.00 6,900.00
6,300.00 6,400.00
7,800.00 8,000.00
12,600.00 12,800.00
2,900.00 2,900.00
2,800.00 2,800.00
6,300.00 6,400.00
11,500.00 11,700.00
31,500.00 32,100.00
6,300.00 6,400.00
3,100.00 3,200.00
3,900.00 4,000.00
8,900.00 9,000.00
- -
8,900.00 9,000.00
9,900.00 10,100.00
10,700.00 10,900.00
13,200.00 13,500.00
- -
68,200.00 69,500.00
75,600.00 77,000.00
81,300.00 82,900.00
90,500.00 92,200.00
89,200.00 90,900.00
99,700.00 101,600.00
115,500.00 117,700.00
HARGA HARGA
ATAS EKSTREM
(Rp) (Rp)
- -
46,700.00 47,600.00
51,400.00 52,400.00
59,300.00 60,400.00
71,900.00 73,200.00
77,700.00 79,100.00
86,100.00 87,700.00
- -
33,000.00 33,600.00
45,100.00 46,000.00
42,000.00 42,800.00
- -
44,100.00 44,900.00
26,200.00 26,700.00
51,400.00 52,400.00
57,700.00 58,800.00
115,500.00 117,700.00
- -
68,200.00 69,500.00
78,700.00 80,200.00
89,200.00 90,900.00
80,800.00 82,300.00
89,200.00 90,900.00
102,900.00 104,800.00
- -
22,000.00 22,400.00
30,400.00 31,000.00
38,800.00 39,500.00
44,100.00 44,900.00
- -
54,600.00 55,600.00
60,900.00 62,000.00
70,300.00 71,600.00
78,700.00 80,200.00
68,200.00 69,500.00
57,700.00 58,800.00
HARGA HARGA
ATAS EKSTREM
(Rp) (Rp)
184,800.00 188,300.00
65,100.00 66,300.00
94,500.00 96,300.00
105,000.00 107,000.00
8,400.00 8,500.00
- -
- -
27,300,000.00 27,820,000.00
26,250,000.00 26,750,000.00
6,720,000.00 6,848,000.00
6,300,000.00 6,420,000.00
6,300,000.00 6,420,000.00
5,775,000.00 5,885,000.00
5,250,000.00 5,350,000.00
4,830,000.00 4,922,000.00
3,675,000.00 3,745,000.00
3,150,000.00 3,210,000.00
11,550,000.00 11,770,000.00
10,920,000.00 11,128,000.00
26,800.00 27,300.00
25,200.00 25,600.00
32,300.00 32,900.00
2,625,000.00 2,675,000.00
210,000.00 214,000.00
5,200.00 5,300.00
- -
- -
50,400.00 51,300.00
99,700.00 101,600.00
63,000.00 64,200.00
162,700.00 165,800.00
194,200.00 197,900.00
241,500.00 246,100.00
294,000.00 299,600.00
- -
54,600.00 55,600.00
HARGA HARGA
ATAS EKSTREM
(Rp) (Rp)
67,200.00 68,400.00
78,700.00 80,200.00
HARGA HARGA
ATAS EKSTREM
(Rp) (Rp)
- -
126,000.00 128,400.00
173,200.00 176,500.00
228,900.00 233,200.00
267,700.00 272,800.00
67,200.00 68,400.00
- -
- -
- -
36,400.00 37,100.00
34,200.00 34,800.00
39,600.00 40,400.00
37,400.00 38,100.00
63,900.00 65,100.00
- -
6,000.00 6,200.00
6,600.00 6,700.00
- -
39,600.00 40,400.00
41,800.00 42,600.00
40,800.00 41,600.00
45,200.00 46,100.00
- -
56,700.00 57,700.00
58,800.00 59,900.00
54,600.00 55,600.00
55,600.00 56,700.00
52,500.00 53,500.00
59,100.00 60,200.00
40,400.00 41,100.00
42,000.00 42,800.00
68,200.00 69,500.00
72,200.00 73,600.00
59,100.00 60,200.00
72,200.00 73,600.00
78,700.00 80,200.00
HARGA HARGA
ATAS EKSTREM
(Rp) (Rp)
187,000.00 190,000.00
59,100.00 60,200.00
65,300.00 66,500.00
46,700.00 47,600.00
48,300.00 49,200.00
65,600.00 66,800.00
91,800.00 93,600.00
102,300.00 104,300.00
85,300.00 86,900.00
105,000.00 107,000.00
5,200.00 5,300.00
7,800.00 8,000.00
10,500.00 10,700.00
7,200.00 7,300.00
262,500.00 267,500.00
131,200.00 133,700.00
131,200.00 133,700.00
262,500.00 267,500.00
157,500.00 160,500.00
472,500.00 481,500.00
73,500.00 74,900.00
357,000.00 363,800.00
514,500.00 524,300.00
31,500.00 32,100.00
63,000.00 64,200.00
14,700.00 14,900.00
210,000.00 214,000.00
- -
- -
- -
49,800.00 50,800.00
78,700.00 80,200.00
97,100.00 98,900.00
147,000.00 149,800.00
194,200.00 197,900.00
47,200.00 48,100.00
HARGA HARGA
ATAS EKSTREM
(Rp) (Rp)
84,000.00 85,600.00
- -
353,800.00 360,500.00
533,400.00 543,500.00
603,700.00 615,200.00
958,600.00 976,900.00
1,266,300.00 1,290,400.00
1,934,100.00 1,970,900.00
2,400,300.00 2,446,000.00
- -
194,200.00 197,900.00
239,400.00 243,900.00
337,000.00 343,400.00
470,400.00 479,300.00
532,300.00 542,400.00
703,500.00 716,900.00
882,000.00 898,800.00
1,518,300.00 1,547,200.00
2,201,800.00 2,243,700.00
- -
7,300.00 7,400.00
8,400.00 8,500.00
11,500.00 11,700.00
15,700.00 16,000.00
10,500.00 10,700.00
12,600.00 12,800.00
- -
213,100.00 217,200.00
311,800.00 317,700.00
336,000.00 342,400.00
542,800.00 553,100.00
812,700.00 828,100.00
1,072,000.00 1,092,400.00
- -
- -
10,500.00 10,700.00
HARGA HARGA
ATAS EKSTREM
(Rp) (Rp)
11,000.00 11,200.00
11,000.00 11,200.00
11,000.00 11,200.00
11,000.00 11,200.00
- -
22,700.00 23,200.00
19,000.00 20,000.00
28,800.00 29,400.00
28,800.00 29,400.00
60,900.00 62,000.00
60,900.00 62,000.00
36,700.00 37,400.00
19,900.00 20,300.00
21,000.00 21,400.00
15,700.00 16,000.00
18,900.00 19,200.00
203,900.00 207,800.00
33,800.00 34,500.00
16,100.00 16,400.00
- -
23,100.00 23,500.00
33,600.00 34,200.00
246,700.00 251,400.00
21,000.00 21,400.00
341,200.00 347,700.00
472,500.00 481,500.00
472,500.00 481,500.00
315,000.00 321,000.00
84,000.00 85,600.00
94,500.00 96,300.00
157,500.00 160,500.00
178,500.00 181,900.00
94,500.00 96,300.00
105,000.00 107,000.00
330,700.00 337,000.00
414,700.00 422,600.00
HARGA HARGA
ATAS EKSTREM
(Rp) (Rp)
1,312,500.00 1,337,500.00
393,700.00 401,200.00
43,900.00 44,800.00
13,900.00 14,200.00
- -
HARGA HARGA
ATAS EKSTREM
(Rp) (Rp)
- -
- -
24,400.00 24,900.00
33,200.00 33,900.00
45,400.00 46,300.00
147,400.00 150,200.00
187,100.00 190,600.00
391,800.00 399,300.00
568,800.00 579,700.00
1,219,600.00 1,242,900.00
1,924,600.00 1,961,300.00
3,003,800.00 3,061,000.00
4,798,000.00 4,889,400.00
- -
- -
107,100.00 109,100.00
137,500.00 140,100.00
210,000.00 214,000.00
318,100.00 324,200.00
433,600.00 441,900.00
553,300.00 563,800.00
715,000.00 728,600.00
1,034,200.00 1,053,900.00
1,657,900.00 1,689,500.00
2,936,800.00 2,992,700.00
- -
- -
79,400.00 80,900.00
153,800.00 156,700.00
235,500.00 239,900.00
374,300.00 381,400.00
582,600.00 593,700.00
- -
- -
6,300.00 6,400.00
15,200.00 15,500.00
HARGA HARGA
ATAS EKSTREM
(Rp) (Rp)
47,800.00 48,700.00
12,600.00 12,800.00
- -
78,700.00 80,200.00
84,000.00 85,600.00
15,700.00 16,000.00
3,100.00 3,200.00
- -
18,900.00 19,200.00
21,000.00 21,400.00
23,100.00 23,500.00
30,400.00 31,000.00
18,900.00 19,200.00
16,800.00 17,100.00
26,200.00 26,700.00
84,000.00 85,600.00
89,200.00 90,900.00
110,200.00 112,300.00
136,500.00 139,100.00
231,000.00 235,400.00
304,500.00 310,300.00
- -
- -
- -
23,600.00 24,000.00
26,200.00 26,700.00
4,200.00 4,200.00
31,500.00 32,100.00
42,000.00 42,800.00
61,900.00 63,100.00
57,700.00 58,800.00
17,800.00 18,100.00
94,500.00 96,300.00
15,100.00 15,400.00
13,600.00 13,900.00
62,700.00 63,900.00
HARGA HARGA
ATAS EKSTREM
(Rp) (Rp)
42,000.00 42,800.00
73,500.00 74,900.00
63,000.00 64,200.00
63,000.00 64,200.00
- -
HARGA HARGA
ATAS EKSTREM
(Rp) (Rp)
- -
5,200.00 5,300.00
4,200.00 4,200.00
31,500.00 32,100.00
39,900.00 40,600.00
79,800.00 81,300.00
26,200.00 26,700.00
54,600.00 55,600.00
89,700.00 91,400.00
51,400.00 52,400.00
77,700.00 79,100.00
55,100.00 56,100.00
63,600.00 64,800.00
- -
- -
28,300.00 28,800.00
54,600.00 55,600.00
54,600.00 55,600.00
22,000.00 22,400.00
15,700.00 16,000.00
26,200.00 26,700.00
12,600.00 12,800.00
- -
- -
84,000.00 85,600.00
102,300.00 104,300.00
220,500.00 224,700.00
309,700.00 315,600.00
89,200.00 90,900.00
105,000.00 107,000.00
84,000.00 85,600.00
105,000.00 107,000.00
306,000.00 311,900.00
444,600.00 453,100.00
473,500.00 482,500.00
531,300.00 541,400.00
HARGA HARGA
ATAS EKSTREM
(Rp) (Rp)
- -
89,200.00 90,900.00
131,200.00 133,700.00
220,500.00 224,700.00
262,500.00 267,500.00
441,000.00 449,400.00
- -
- -
- -
- -
3,600.00 3,700.00
4,200.00 4,200.00
6,400.00 6,500.00
9,300.00 9,500.00
9,400.00 9,600.00
16,200.00 16,500.00
29,400.00 29,900.00
37,800.00 38,500.00
14,400.00 14,700.00
22,000.00 22,400.00
37,800.00 38,500.00
55,600.00 56,700.00
7,500.00 7,700.00
12,000.00 12,300.00
24,100.00 24,600.00
14,100.00 14,400.00
22,000.00 22,400.00
32,500.00 33,100.00
47,200.00 48,100.00
- -
17,800.00 18,100.00
12,600.00 12,800.00
21,000.00 21,400.00
15,700.00 16,000.00
- -
147,000.00 149,800.00
HARGA HARGA
ATAS EKSTREM
(Rp) (Rp)
241,500.00 246,100.00
346,500.00 353,100.00
HARGA HARGA
ATAS EKSTREM
(Rp) (Rp)
12,600.00 12,800.00
17,800.00 18,100.00
15,700.00 16,000.00
21,000.00 21,400.00
8,600.00 8,800.00
10,500.00 10,700.00
15,700.00 16,000.00
157,500.00 160,500.00
15,700.00 16,000.00
8,400.00 8,500.00
17,800.00 18,100.00
42,000.00 42,800.00
- -
472,500.00 481,500.00
1,023,700.00 1,043,200.00
420,000.00 428,000.00
420,000.00 428,000.00
525,000.00 535,000.00
- -
- -
63,000.00 64,200.00
73,500.00 74,900.00
94,500.00 96,300.00
157,500.00 160,500.00
63,000.00 64,200.00
84,000.00 85,600.00
52,500.00 53,500.00
210,000.00 214,000.00
- -
15,700.00 16,000.00
5,200.00 5,300.00
12,600.00 12,800.00
157,500.00 160,500.00
94,500.00 96,300.00
12,600.00 12,800.00
15,700.00 16,000.00
HARGA HARGA
ATAS EKSTREM
(Rp) (Rp)
42,000.00 42,800.00
178,500.00 181,900.00
22,000.00 22,400.00
26,200.00 26,700.00
15,700.00 16,000.00
178,500.00 181,900.00
105,000.00 107,000.00
26,200.00 26,700.00
210,000.00 214,000.00
15,700.00 16,000.00
- -
2,100,000.00 2,140,000.00
2,100,000.00 2,140,000.00
273,000.00 278,200.00
1,470,000.00 1,498,000.00
997,500.00 1,016,500.00
472,500.00 481,500.00
367,500.00 374,500.00
315,000.00 321,000.00
199,500.00 203,300.00
73,500.00 74,900.00
147,000.00 149,800.00
4,200,000.00 4,280,000.00
315,000.00 321,000.00
210,000.00 214,000.00
1,365,000.00 1,391,000.00
84,000.00 85,600.00
- -
3,780,000.00 3,852,000.00
6,825,000.00 6,955,000.00
84,000.00 85,600.00
5,200.00 5,300.00
84,000.00 85,600.00
- -
1,050,000.00 1,070,000.00
HARGA HARGA
ATAS EKSTREM
(Rp) (Rp)
1,890,000.00 1,926,000.00
94,500.00 96,300.00
- -
HARGA HARGA
ATAS EKSTREM
(Rp) (Rp)
- -
18,900.00 19,200.00
27,300.00 27,800.00
31,500.00 32,100.00
25,600.00 26,100.00
18,900.00 19,200.00
17,800.00 18,100.00
26,200.00 26,700.00
7,300.00 7,400.00
6,300.00 6,400.00
- -
- -
131,200.00 133,700.00
141,700.00 144,400.00
120,700.00 123,000.00
131,200.00 133,700.00
110,200.00 112,300.00
120,700.00 123,000.00
99,700.00 101,600.00
105,000.00 107,000.00
84,000.00 85,600.00
94,500.00 96,300.00
4,200.00 4,200.00
94,500.00 96,300.00
- -
- -
10,500.00 10,700.00
63,000.00 64,200.00
12,600.00 12,800.00
12,600.00 12,800.00
5,200.00 5,300.00
3,100.00 3,200.00
10,600.00 10,800.00
10,900.00 11,100.00
1,575,000.00 1,605,000.00
42,000.00 42,800.00
HARGA HARGA
ATAS EKSTREM
(Rp) (Rp)
42,000.00 42,800.00
3,100.00 3,200.00
1,000.00 1,000.00
84,000.00 85,600.00
945,000.00 963,000.00
367,500.00 374,500.00