A. PEK. PERSIAPAN
I. PEK. PERSIAPAN Rp. #REF!
B. LANTAI I
I. PEK. TANAH Rp. 1,826,064.24
II. PEK. PASANGAN Rp. 19,540,490.77
III. PEK. BETON Rp. 35,683,658.62
IV. PEK. LANTAI Rp. 6,207,203.48
V. PEK. PENUTUP LANGIT - LANGIT Rp. 3,051,784.38
VI. PEK. MEKANIKAL ELEKTRIKAL Rp. 4,995,000.00
VII. PEK. KUSEN ALUMUNIUM Rp. 8,400,000.00
VIII. PEK. ACCESORIS Rp. 3,835,000.00
IX. PEK. PENGECATAN Rp. 185,019.64
C. LANTAI 2
I. PEK. PASANGAN Rp. 14,522,410.93
II. PEK. BETON Rp. 6,157,214.08
III. PEK. LANTAI Rp. 5,497,950.67
IV. PEK. PENUTUP LANGIT - LANGIT Rp. #REF!
V. PEK. KUSEN ALUMUNIUM Rp. #REF!
VI. PEK. MEKANIKAL ELEKTRIKAL Rp. #REF!
VII. PEK. PENGECATAN Rp. 3,360,917.32
VIII. PEK. ATAP Rp. 9,906,708.32
HARGA SATUAN
NO U R A I A N P E K E R J AA N VOL SAT UPAH + BAHAN
( RP. )
1 2 3 4 5
A. PEK. PERSIAPAN
1 UITZET DAN BOUWPLANK 1.00 LS 500,000.00
SUB TOTAL
B. LANTAI I
I. PEK. TANAH
1 GALIAN TANAH PONDASI DAN FOOTPLAT 46.80 M3 22,625.00
2 URUGAN TANAH KEMBALI BEKAS GALIAN 40.10 M3 7,775.00
3 URUGAN PASIR URUG BAWAH PONDASI 4.03 M3 69,050.00
4 URUGAN PASIR URUG BAWAH FOOTPLAT 0.70 M3 69,050.00
5 URUGAN PASIR URUG BAWAH LANTAI 1.86 M3 69,050.00
SUB TOTAL
II. PEK. PASANGAN
1 PASANGAN PONDASI BATU BELAH 1 : 4 12.10 M3 414,725.00
2 PASANGAN AANSTAMPING 6.45 M3 155,025.00
3 PAS. BATU BATA 1 : 3 14.77 M2 62,924.00
4 PAS. BATU BATA 1 : 5 118.12 M2 56,716.00
5 PLESTERAN 1 : 3 t 15 mm 29.53 M2 23,066.20
6 PLESTERAN 1 : 5 t 15 mm 236.25 M2 20,240.80
7 PLESTERAN SUDUT, SPONENGAN DAN TALI AIR 80.65 M1 5,360.40
SUB TOTAL
III. PEK. BETON
1 PEK. RABAT BETON BAWAH LANTAI 1 : 3 : 5 1.86 M3 569,533.48
2 BETON LANTAI KERJA 1 : 3 : 5 0.70 M3 569,533.48
3 BETON POOR/FOOTPLAT 3.54 M3 1,771,060.00
4 BETON SLOOF STRUKTUR 20/30 2.42 M3 1,945,620.60
5 BETON KOLOM 30/30 2.89 M3 2,136,614.18
6 BETON KOLOM PRAKTIS 15/15 0.22 M3 1,874,205.71
7 BETON BALOK STRUKTUR 15/25 1.58 M3 2,372,745.00
8 BETON BALOK LATIO 0.18 M3 2,110,627.50
9 BETON PLAT LEUVEL 0.38 M3 1,958,437.50
10 BETON PLAT LANTAI 2 3.29 M3 1,958,437.50
11 BETON TANGGA 2.72 M3 1,958,437.50
SUB TOTAL
IV. PEK. KERAMIK
1 GRANIT 60/60 33.08 M2 139,633.00
2 KERAMIK LANTAI KM 20/20 TEKSTUR 2.25 M2 95,776.00
3 KERAMIK DINDING KM 20/25 4.80 M2 82,645.00
4 PAVING BLOCK 11.49 M2 85,000.00
SUB TOTAL
V. PEK. PENUTUP LANGIT - LANGIT
1 PLAFON GYPSUM RK HOLLO 33.08 M2 66,370.00
2 LIS TEPI PLAFOND GYPSUM 37.49 M1 17,525.00
3 PLAFOND KALSIBOARD RK HOLLO 2.25 M2 62,037.50
4 LIS TEPI PLAFOND KAYU PROFIL 6.00 M2 10,000.00
SUB TOTAL
VI. PEK. MEKANIKAL ELEKTRIKAL
1 INSTALASI TITIK LAMPU 9.00 TTK 115,000.00
2 INSTALASI TITIK STOP KONTAK 4.00 TTK 115,000.00
3 STOP KONTAK 4.00 TTK 50,000.00
4 SAKLAR TUNGGAL 5.00 BH 25,000.00
5 SAKLAR GANDA 2.00 BH 25,000.00
6 DOWN LIGHT DENGAN LAMPU SL 18 WATT 9.00 BH 125,000.00
7 PASANG BARU LISTRIK DAYA 1300 WATT 1.00 LS 2,000,000.00
SUB TOTAL
VII. PEK. KUSEN ALUMUNIUM
1 PINTU PJ1 1.00 UNIT 2,750,000.00
(terdiri dari kosen alumunium 4", daun jendela kaca alumunium jungkit, pasang kaca mati 5 mm,
daun pintu multipleks 6 mm finishing HPL, engsel pintu, engsel jendela, spring kneep jendela,
kait angin jendela, door closer pintu, handle pintu, kunci pintu dll)
2 PINTU P1 1.00 UNIT 1,800,000.00
(terdiri dari kosen alumunium 4", daun pintu multipleks 6 mm finishing HPL, engsel pintu,
door closer pintu, handle pintu, kunci pintu dll)
3 JENDELA JI 1.00 UNIT 1,250,000.00
(terdiri dari kosen alumunium 4", daun jendela kaca alumunium jungkit, pasang kaca mati 5 mm,
engsel jendela, spring kneep jendela, kait angin jendela dll)
4 JENDELA J2 1.00 UNIT 1,000,000.00
(terdiri dari kosen alumunium 4", daun jendela kaca alumunium jungkit, pasang kaca mati 5 mm,
engsel jendela, spring kneep jendela, kait angin jendela dll)
5 JENDELA J3 1.00 UNIT 800,000.00
(terdiri dari kosen alumunium 4", daun jendela kaca alumunium jungkit, pasang kaca mati 5 mm,
engsel jendela, spring kneep jendela, kait angin jendela dll)
6 BOUVENLIGHT KM 1.00 UNIT 500,000.00
(terdiri dari kosen alumunium 4", daun jendela kaca alumunium jungkit, pasang kaca mati 5 mm,
engsel jendela, spring kneep jendela, kait angin jendela dll)
7 PINTU PVC KM/ WC 1.00 UNIT 300,000.00
SUB TOTAL
VIII. PEK. SANITASI
1 CLOSET DUDUK 1.00 UNIT 950,000.00
2 KRAN AIR 2.00 BH 30,000.00
3 FLOOR DRAIN 1.00 BH 25,000.00
4 MEJA DAPUR 1.00 UNIT 300,000.00
5 INSTALASI AIR BERSIH 1.00 LS 500,000.00
6 INSTALASI AIR KOTOR 1.00 LS 500,000.00
7 SEPTICTANK 1.00 UNIT 1,500,000.00
SUB TOTAL
IX. PEK. PENGECATAN
1 CAT DINDING INTERIOR 147.65 M2 9,835.50
2 CAT DINDING EXTERIOR (147.65) M2 10,935.50
3 CAT PLAFOND 35.33 M2 9,835.50
SUB TOTAL
TOTAL B
C. LANTAI 2
I. PEK. PASANGAN
1 PAS. BATU BATA 1 : 3 15.93 M2 62,924.00
2 PAS. BATU BATA 1 : 5 127.41 M2 56,716.00
3 PLESTERAN 1 : 3 t 15 mm 31.85 M2 23,066.20
4 PLESTERAN 1 : 5 t 15 mm 254.81 M2 20,240.80
5 PLESTERAN SUDUT, SPONENGAN DAN TALI AIR 75.02 M1 5,360.40
SUB TOTAL
II. PEK. BETON
1 BETON KOLOM PRAKTIS 1.11 M3 1,874,205.71
2 BETON BALOK LATEI (GUNUNGAN) 0.29 M3 2,110,627.50
3 BETON BALOK RINGBALK 1.64 M3 2,110,627.50
SUB TOTAL
III. PEK. LANTAI
1 GRANIT 60/60 34.99 M2 139,633.00
2 KERAMIK LANTAI KM 20/20 TEKSTUR 2.25 M2 95,776.00
3 KERAMIK DINDING KM 20/25 4.80 M2 82,645.00
SUB TOTAL
IV. PEK. PENUTUP LANGIT - LANGIT
1 PLAFON GYPSUM RK HOLLO 34.99 M2 66,370.00
2 LIS TEPI PLAFOND GYPSUM 40.49 M1 17,525.00
3 PLAFOND KALSIBOARD RK HOLLO 2.25 M2 62,037.50
4 LIS TEPI PLAFOND KAYU PROFIL 6.00 M2 10,000.00
SUB TOTAL
V. PEK. KUSEN ALUMUNIUM
1 PINTU P1 2.00 UNIT 2,000,000.00
(terdiri dari kosen alumunium 4", daun pintu multipleks 6 mm finishing HPL, engsel pintu,
door closer pintu, handle pintu, kunci pintu dll)
2 JENDELA JI 1.00 UNIT 1,250,000.00
(terdiri dari kosen alumunium 4", daun jendela kaca alumunium jungkit, pasang kaca mati 5 mm,
engsel jendela, spring kneep jendela, kait angin jendela dll)
3 JENDELA J2 1.00 UNIT 1,000,000.00
(terdiri dari kosen alumunium 4", daun jendela kaca alumunium jungkit, pasang kaca mati 5 mm,
engsel jendela, spring kneep jendela, kait angin jendela dll)
4 JENDELA J3 2.00 UNIT 800,000.00
(terdiri dari kosen alumunium 4", daun jendela kaca alumunium jungkit, pasang kaca mati 5 mm,
engsel jendela, spring kneep jendela, kait angin jendela dll)
5 BOUVENLIGHT KM 1.00 UNIT 500,000.00
(terdiri dari kosen alumunium 4", daun jendela kaca alumunium jungkit, pasang kaca mati 5 mm,
engsel jendela, spring kneep jendela, kait angin jendela dll)
6 PINTU PVC KM/ WC 1.00 UNIT 300,000.00
SUB TOTAL
VI. PEK. SANITASI
1 CLOSET DUDUK 1.00 UNIT 950,000.00
2 KRAN AIR 2.00 BH 30,000.00
3 FLOOR DRAIN 1.00 BH 25,000.00
4 MEJA DAPUR 1.00 UNIT 300,000.00
5 INSTALASI AIR BERSIH 1.00 LS 500,000.00
6 INSTALASI AIR KOTOR 1.00 LS 500,000.00
7 SEPTICTANK 1.00 UNIT 1,500,000.00
SUB TOTAL
VII. PEK. MEKANIKAL ELEKTRIKAL
1 INSTALASI TITIK LAMPU 5.00 TTK 115,000.00
2 INSTALASI TITIK STOP KONTAK 3.00 TTK 115,000.00
3 STOP KONTAK 3.00 TTK 50,000.00
4 SAKLAR TUNGGAL 4.00 BH 25,000.00
5 SAKLAR GANDA 1.00 BH 25,000.00
6 DOWN LIGHT DENGAN LAMPU SL 18 WATT 5.00 BH 125,000.00
SUB TOTAL
VIII. PEK. PENGECATAN
1 CAT DINDING INTERIOR 127.41 M2 9,835.50
2 CAT DINDING EXSTERIOR 159.26 M2 10,935.50
3 CAT PLAFOND 37.24 M2 9,835.50
SUB TOTAL
IX. PEK. ATAP
1 KUDA KUDA BAJA RINGAN 52.14 M2 110,000.00
2 PENUTUP ATAP GENTENG MORANDO GLAZUR 52.14 M2 51,495.00
3 BUBUNGAN GENTENG 23.00 M1 44,435.00
4 LISTPLANG KALSIPLANK 15.50 M1 30,000.00
SUB TOTAL
TOTAL C
TOTAL ( A + B + C )
PEMBULATAN
Terbilang :
DAFTAR ANALISA PEKERJAAN
6,10,2 Tenaga
Pekerja 0.3000 OH X Rp 29,000.00 = Rp 8,700.00
Tukang batu 0.1000 OH X Rp 32,500.00 = Rp 3,250.00
Kepala Tukang 0.0100 OH X Rp 35,000.00 = Rp 350.00
Mandor 0.0150 OH X Rp 35,000.00 = Rp 525.00
Jumlah I = Rp 12,825.00
1 m2 Pasang batu bata 1 : 5 Jumlah I + II Rp 56,716.00
1 m2 spesi tebal 30 mm
Bahan
Semen Portland 14.1500 kg X Rp 1,200.00 = Rp 16,980.00
Pasir pasang 0.0390 m3 X Rp 95,000.00 = Rp 3,705.00
Jumlah I = Rp 20,685.00
Tenaga
Pekerja 0.3000 OH X Rp 29,000.00 = Rp 8,700.00
Tukang batu 0.2000 OH X Rp 32,500.00 = Rp 6,500.00
Kepala Tukang 0.0200 OH X Rp 35,000.00 = Rp 700.00
Mandor 0.0130 OH X Rp 35,000.00 = Rp 455.00
Jumlah I = Rp 16,355.00
1 m2 Jumlah I + II Rp 37,040.00
1 m3 1,234,666.67
6,20 1 m1 Plesteran Skoning 1 : 2/Ban - banan
6,20,1 Bahan
Semen Portland 0.5000 kg X Rp 1,200.00 = Rp 600.00
Pasir pasang (muntilan) 0.0130 m3 X Rp 95,000.00 = Rp 1,235.00
Jumlah I = Rp 1,835.00
6,20,2 Tenaga
Pekerja 0.0570 OH X Rp 29,000.00 = Rp 1,653.00
Tukang batu 0.3800 OH X Rp 32,500.00 = Rp 12,350.00
Kepala Tukang 0.0380 OH X Rp 35,000.00 = Rp 1,330.00
Mandor 0.0300 OH X Rp 35,000.00 = Rp 1,050.00
Jumlah I = Rp 16,383.00
Jumlah I + II Rp 18,218.00
1 m1 Skonengan sudut 1 : 2
Bahan
Semen Portland 1.4240 kg X Rp 1,200.00 = Rp 1,708.80
Pasir pasang (muntilan) 0.0023 m3 X Rp 95,000.00 = Rp 216.60
Jumlah I = Rp 1,925.40
Tenaga
Pekerja 0.0800 OH X Rp 29,000.00 = Rp 2,320.00
Tukang batu 0.0300 OH X Rp 32,500.00 = Rp 975.00
Kepala Tukang 0.0020 OH X Rp 35,000.00 = Rp 70.00
Mandor 0.0020 OH X Rp 35,000.00 = Rp 70.00
Jumlah I = Rp 3,435.00
Jumlah I + II Rp 5,360.40
VII.31.2 Tenaga
Pekerja 0.6600 OH X Rp 29,000.00 = Rp 19,140.00
Tukang kayu 0.3300 OH X Rp 32,500.00 = Rp 10,725.00
Kepala Tukang 0.0330 OH X Rp 35,000.00 = Rp 1,155.00
Mandor 0.0330 OH X Rp 35,000.00 = Rp 1,155.00
Jumlah I = Rp 32,175.00
Jumlah I + II Rp 163,475.00
LT 1
LT 2
1 m2 Pasang Granito
Bahan
granito 40 x 40 6.6300 bh X Rp 37,707.39 = Rp 250,000.00
Semen Portland 9.8000 kg X Rp 1,200.00 = Rp 11,760.00
Pasir pasang 0.0450 m3 X Rp 95,000.00 = Rp 4,275.00
Semen warna 1.3000 kg X Rp 5,000.00 = Rp 6,500.00
Jumlah I = Rp 272,535.00
Tenaga
Pekerja 0.2500 OH X Rp 29,000.00 = Rp 7,250.00
Tukang batu 0.1200 OH X Rp 32,500.00 = Rp 3,900.00
Kepala Tukang 0.0120 OH X Rp 35,000.00 = Rp 420.00
Mandor 0.0130 OH X Rp 35,000.00 = Rp 455.00
Jumlah I = Rp 12,025.00
Jumlah I + II Rp 284,560.00
6,35,2 Tenaga
Pekerja 0.6200 OH X Rp 29,000.00 = Rp 17,980.00
Tukang batu 0.3500 OH X Rp 32,500.00 = Rp 11,375.00
Kepala Tukang 0.0350 OH X Rp 35,000.00 = Rp 1,225.00
Mandor 0.0300 OH X Rp 35,000.00 = Rp 1,050.00
Jumlah I = Rp 31,630.00
Jumlah I + II Rp 99,205.30
6,36,2 Tenaga
Pekerja 0.6200 OH X Rp 29,000.00 = Rp 17,980.00
Tukang batu 0.3500 OH X Rp 32,500.00 = Rp 11,375.00
Kepala Tukang 0.0350 OH X Rp 35,000.00 = Rp 1,225.00
Mandor 0.0300 OH X Rp 35,000.00 = Rp 1,050.00
Jumlah I = Rp 31,630.00
Jumlah I + II Rp 95,776.00
6,36,2 Tenaga
Pekerja 0.6200 OH X Rp 29,000.00 = Rp 17,980.00
Tukang batu 0.3500 OH X Rp 32,500.00 = Rp 11,375.00
Kepala Tukang 0.0350 OH X Rp 35,000.00 = Rp 1,225.00
Mandor 0.0300 OH X Rp 35,000.00 = Rp 1,050.00
Jumlah I = Rp 31,630.00
Jumlah I + II Rp 95,776.00
XIII.68 1 m2 Pasang Keramik dinding 20 / 25 Motif
XIII.68.1 Bahan
keramik 20 / 25 20.0000 bh X Rp 1,950.00 = Rp 39,000.00
Semen Portland 9.3000 kg X Rp 1,200.00 = Rp 11,160.00
Pasir pasang 0.0180 m3 X Rp 95,000.00 = Rp 1,710.00
Semen warna 1.5000 kg X Rp 5,000.00 = Rp 7,500.00
Jumlah I = Rp 59,370.00
XIII.68.2 Tenaga
Pekerja 0.6000 OH X Rp 29,000.00 = Rp 17,400.00
Tukang batu 0.1000 OH X Rp 32,500.00 = Rp 3,250.00
Kepala Tukang 0.0450 OH X Rp 35,000.00 = Rp 1,575.00
Mandor 0.0300 OH X Rp 35,000.00 = Rp 1,050.00
Jumlah I = Rp 23,275.00
Jumlah I + II Rp 82,645.00
XIII.38.2 Tenaga
Pekerja 0.0900 OH X Rp 29,000.00 = Rp 2,610.00
Tukang batu 0.0900 OH X Rp 32,500.00 = Rp 2,925.00
Kepala Tukang 0.0090 OH X Rp 35,000.00 = Rp 315.00
Mandor 0.0045 OH X Rp 35,000.00 = Rp 157.50
Jumlah I = Rp 6,007.50
Jumlah I + II Rp 83,891.50
4.0000
VI.31 1 m2 Pasang Usuk dan Reng kayu Bengkirai 0.011
VI.31.1 Bahan
Kayu Bengkirai usuk 5/7 0.0140 m3 X Rp 4,500,000.00 = Rp 63,000.00
Kayu Bengkirai reng 2/3 0.0030 m3 X Rp 4,500,000.00 = Rp 13,500.00
Paku 0.2500 kg X Rp 12,000.00 = Rp 3,000.00
Jumlah I = Rp 79,500.00
VI.31.2 Tenaga
Pekerja 0.1000 OH X Rp 29,000.00 = Rp 2,900.00
Tukang kayu 0.1000 OH X Rp 32,500.00 = Rp 3,250.00
Kepala Tukang 0.0100 OH X Rp 35,000.00 = Rp 350.00
Mandor 0.0050 OH X Rp 35,000.00 = Rp 175.00
Jumlah I = Rp 6,675.00
Jumlah I + II Rp 86,175.00
VI.39.2 Tenaga
Pekerja 0.1500 OH X Rp 29,000.00 = Rp 4,350.00
Tukang kayu 0.2500 OH X Rp 32,500.00 = Rp 8,125.00
Kepala Tukang 0.0250 OH X Rp 35,000.00 = Rp 875.00
Mandor 0.0750 OH X Rp 35,000.00 = Rp 2,625.00
Jumlah I = Rp 15,975.00
Jumlah I + II Rp 41,175.00
IX.24 1 m2 Pasang langit - langit gypsum board 9 mm
IX.24.1 Bahan
gypsum board 9 mm 0.3640 lbr X Rp 50,000.00 = Rp 18,200.00
Paku 0.1100 kg X Rp 12,000.00 = Rp 1,320.00
Jumlah I = Rp 19,520.00
IX.24.2 Tenaga
Pekerja 0.1000 OH X Rp 29,000.00 = Rp 2,900.00
Tukang kayu 0.0500 OH X Rp 32,500.00 = Rp 1,625.00
Kepala Tukang 0.0050 OH X Rp 35,000.00 = Rp 175.00
Mandor 0.0050 OH X Rp 35,000.00 = Rp 175.00
Jumlah I = Rp 4,875.00
Jumlah I + II Rp 24,395.00
1 m1 Pasang bubungan
Bahan
Bubungan 5.0000 bh X Rp 7,000.00 = Rp 35,000.00
Jumlah I = Rp 35,000.00
Tenaga
Pekerja 0.2000 OH X Rp 29,000.00 = Rp 5,800.00
Tukang kayu 0.1000 OH X Rp 32,500.00 = Rp 3,250.00
Kepala Tukang 0.0100 OH X Rp 35,000.00 = Rp 350.00
Mandor 0.0010 OH X Rp 35,000.00 = Rp 35.00
Jumlah I = Rp 9,435.00
Jumlah I + II Rp 44,435.00
1 m2 Pasang Galvalum
Bahan
Galvalum 1.2000 m2 X Rp 90,000.00 = Rp 108,000.00
Paku pancing 0.1200 kg X Rp 12,000.00 = Rp 1,440.00
Jumlah I = Rp 109,440.00
Tenaga
Pekerja 0.1400 OH X Rp 29,000.00 = Rp 4,060.00
Tukang kayu 0.0670 OH X Rp 32,500.00 = Rp 2,177.50
Kepala Tukang 0.0070 OH X Rp 35,000.00 = Rp 245.00
Mandor 0.0070 OH X Rp 35,000.00 = Rp 245.00
Jumlah I = Rp 6,727.50
Jumlah I + II Rp 116,167.50
6,13.2 Tenaga
Pekerja 0.0950 OH X Rp 29,000.00 = Rp 2,755.00
Tukang 0.0950 OH X Rp 32,500.00 = Rp 3,087.50
Kepala Tukang 0.0090 OH X Rp 35,000.00 = Rp 315.00
Mandor 0.0050 OH X Rp 35,000.00 = Rp 175.00
Jumlah I = Rp 6,332.50
Jumlah I + II Rp 103,982.50
6,13.2 Tenaga
Pekerja 0.0850 OH X Rp 29,000.00 = Rp 2,465.00
Tukang Kontruksi besi 0.0850 OH X Rp 32,500.00 = Rp 2,762.50
Kepala Tukang 0.0080 OH X Rp 35,000.00 = Rp 280.00
Mandor 0.0040 OH X Rp 35,000.00 = Rp 140.00
Jumlah I = Rp 5,647.50
Jumlah I + II Rp 41,147.50
6,13.2 Tenaga
Pekerja 0.0850 OH X Rp 29,000.00 = Rp 2,465.00
Tukang Kontruksi besi 0.0850 OH X Rp 32,500.00 = Rp 2,762.50
Kepala Tukang 0.0080 OH X Rp 35,000.00 = Rp 280.00
Mandor 0.0040 OH X Rp 35,000.00 = Rp 140.00
Jumlah I = Rp 5,647.50
Jumlah I + II Rp 41,147.50
6,13.2 Tenaga
Pekerja 0.0850 OH X Rp 29,000.00 = Rp 2,465.00
Tukang Kontruksi besi 0.0850 OH X Rp 32,500.00 = Rp 2,762.50
Kepala Tukang 0.0080 OH X Rp 35,000.00 = Rp 280.00
Mandor 0.0040 OH X Rp 35,000.00 = Rp 140.00
Jumlah I = Rp 5,647.50
Jumlah I + II Rp 142,697.50
6,13.2 Tenaga
Pekerja 0.0850 OH X Rp 29,000.00 = Rp 2,465.00
Tukang Kontruksi besi 0.0850 OH X Rp 32,500.00 = Rp 2,762.50
Kepala Tukang 0.0080 OH X Rp 35,000.00 = Rp 280.00
Mandor 0.0040 OH X Rp 35,000.00 = Rp 140.00
Jumlah I = Rp 5,647.50
Jumlah I + II Rp 103,997.50
6,11.2 Tenaga
Pekerja 0.4300 OH X Rp 29,000.00 = Rp 12,470.00
Tukang Kontruksi besi 0.4300 OH X Rp 32,500.00 = Rp 13,975.00
Kepala Tukang 0.0043 OH X Rp 35,000.00 = Rp 150.50
Mandor 0.0021 OH X Rp 35,000.00 = Rp 73.50
Jumlah I = Rp 26,669.00
Jumlah I + II Rp 100,169.00
6,.14 1 m2 Cat tembok 1 lapis plamir, 1 lapir cat dasar, 2 lapis cat penutup
6,14.1 Bahan
plamir tembok 0.1000 kg X Rp 15,000.00 = Rp 1,500.00
Cat dasar 0.1000 kg X Rp 15,000.00 = Rp 1,500.00
Cat Penutup 2x 0.2600 kg X Rp 15,000.00 = Rp 3,900.00
Jumlah I = Rp 6,900.00
6,14.2 Tenaga
Pekerja 0.0200 OH X Rp 29,000.00 = Rp 580.00
Tukang cat 0.0630 OH X Rp 32,500.00 = Rp 2,047.50
Kepala Tukang 0.0063 OH X Rp 35,000.00 = Rp 220.50
Mandor 0.0025 OH X Rp 35,000.00 = Rp 87.50
Jumlah I = Rp 2,935.50
Jumlah I + II Rp 9,835.50
6,.14 1 m2 Cat tembok Exterior, 1 lapis cat dasar, 2 lapis cat penutup
6,14.1 Bahan
Cat dasar 0.1000 kg X Rp 15,000.00 = Rp 1,500.00
Cat Penutup 2x 0.2600 kg X Rp 25,000.00 = Rp 6,500.00
Jumlah I = Rp 8,000.00
6,14.2 Tenaga
Pekerja 0.0200 OH X Rp 29,000.00 = Rp 580.00
Tukang cat 0.0630 OH X Rp 32,500.00 = Rp 2,047.50
Kepala Tukang 0.0063 OH X Rp 35,000.00 = Rp 220.50
Mandor 0.0025 OH X Rp 35,000.00 = Rp 87.50
Jumlah I = Rp 2,935.50
Jumlah I + II Rp 10,935.50
XIV.8 1 m2 Cat kayu baru 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup
Bahan
Meni kayu 0.2000 kg X Rp 20,000.00 = Rp 4,000.00
plamir 0.1500 kg X Rp 15,000.00 = Rp 2,250.00
Cat dasar 0.1700 kg X Rp 17,500.00 = Rp 2,975.00
Cat Penutup 0.2600 kg X Rp 20,000.00 = Rp 5,200.00
Jumlah I = Rp 14,425.00
Tenaga
Pekerja 0.0700 OH X Rp 29,000.00 = Rp 2,030.00
Tukang cat 0.0090 OH X Rp 32,500.00 = Rp 292.50
Kepala Tukang 0.0060 OH X Rp 35,000.00 = Rp 210.00
Mandor 0.0025 OH X Rp 35,000.00 = Rp 87.50
Jumlah I = Rp 2,620.00
Jumlah I + II Rp 17,045.00
1 m2 Cat Waterprofing
Bahan
Waterprofing 0.7500 kg X Rp 25,000.00 = Rp 18,750.00
Jumlah I = Rp 18,750.00
Tenaga
Pekerja 0.0350 OH X Rp 29,000.00 = Rp 1,015.00
Tukang cat 0.0550 OH X Rp 32,500.00 = Rp 1,787.50
Kepala Tukang 0.0040 OH X Rp 35,000.00 = Rp 140.00
Mandor 0.0025 OH X Rp 35,000.00 = Rp 87.50
Jumlah I = Rp 3,030.00
Jumlah I + II Rp 21,780.00
1 bh Pasang AC Split 1 PK
Bahan
AC Split 1 PK 1.0000 Unit X Rp 2,500,000.00 = Rp 2,500,000.00
Alat Bantu 1.0000 Ls X Rp 65,000.00 = Rp 65,000.00
Dudukan 1.0000 Set X Rp 70,000.00 = Rp 70,000.00
Jumlah I = Rp 2,565,000.00
Tenaga
Pekerja 0.6000 OH X Rp 29,000.00 = Rp 17,400.00
Tukang listrik 1.2000 OH X Rp 32,500.00 = Rp 39,000.00
Tukang AC 2.0000 OH X Rp 32,500.00 = Rp 65,000.00
Mandor 0.4500 OH X Rp 35,000.00 = Rp 15,750.00
Jumlah I = Rp 137,150.00
Jumlah I + II Rp 2,702,150.00
1 bh Pasang AC Split 2 PK
Bahan
AC Split 2 PK 1.0000 Unit X Rp 4,500,000.00 = Rp 4,500,000.00
Alat Bantu 1.0000 Ls X Rp 65,000.00 = Rp 65,000.00
Dudukan 1.0000 Set X Rp 70,000.00 = Rp 70,000.00
Jumlah I = Rp 4,565,000.00
Tenaga
Pekerja 0.6000 OH X Rp 29,000.00 = Rp 17,400.00
Tukang listrik 1.2000 OH X Rp 32,500.00 = Rp 39,000.00
Tukang AC 2.0000 OH X Rp 32,500.00 = Rp 65,000.00
Mandor 0.4500 OH X Rp 35,000.00 = Rp 15,750.00
Jumlah I = Rp 137,150.00
Jumlah I + II Rp 4,702,150.00
-
-
-
-
DAFTAR HARGA SATUAN PEKERJAAN
HARGA SATUAN
NO U RAIAN P E K E R JAAN SAT
( RP. )
0
0
0
0
HARGA SATUAN BAHAN DAN UPAH KERJA
B BAHAN TIMBUNAN
1 Tanah Urug Biasa M3 30,000.00
2 Pasir Urug M3 50,000.00
3 Sirtu M3 60,000.00
C BAHAN SEMEN DAN KERAMIK
1 Semen PC 40 Kg Zak 48,000.00
2 Semen PC Kg 1,200.00
3 Semen Warna kg 5,000.00
4 Keramik 20 X 25 Motif M2 39,000.00
5 Keramik 20 X 25 Motif Bh 1,950.00
6 Keramik 30 x 30 Motif M2 41,000.00
7 Keramik 30 x 30 Motif Bh 3,690.00
8 Keramik 40 x 40 Motif M2 42,500.00
9 Keramik 40 x 40 Motif Bh 6,800.00
10 Granito 40 x 40 Bh 37,707.39
11 Keramik 20 X 25 Warna M2 39,000.00
12 Keramik 20 X 25 Warna Bh 1,950.00
13 Keramik 20 x 20 tekstur M2 39,000.00
14 Keramik 20 x 20 tekstur Bh 1,560.00
15 Keramik 20 x 20 putih M2 38,000.00
16 Keramik 20 x 20 putih Bh 1,520.00
17 Keramik 20 x 33 Warna M2 38,000.00
18 Keramik 20 x 33 Warna Bh 2,508.00
19 Keramik 30 x 30 tekstur M2 41,000.00
20 Keramik 30 x 30 tekstur Bh 3,690.00
21 Keramik 40 x 40 Warna M2 42,500.00
22 Keramik 40 x 40 Warna Bh 6,800.00
23 Keramik 60 x 60 Warna M2 80,000.00
24 Keramik 60 x 60 Warna Bh 28,800.00
25 Bordes list Motif 7 x 20 Bh 15,000.00
26 Nosing Tile keramik 7/10 Bh 7,500.00
27 List Motif 10 x 20 Bh 5,500.00
D BAHAN KAYU DAN PENUTUP
1 Kayu Bengkirai Klas Papan M3 4,500,000.00
2 Kayu Bengkirai Klas Balok M3 4,500,000.00
3 Kayu Kruing Balok M 3
2,000,000.00
4 Kayu Kruing Papan M3 2,000,000.00
5 Kayu Bekisting (Putih) M3 750,000.00
6 Kayu Buah/ Dolken Btg 9,000.00
7 Pliwood 9 mm lbr 110,000.00
8 Pliwood 6 mm lbr 80,000.00
9 Gypsum board lbr 50,000.00
10 list profil gypsum t 15 M' 12,500.00
11 list profil gypsum t 10 M' 10,000.00
12 Casting kg 15,000.00
13 Lis kayu 1/4 cm M' 2,500.00
14 Aluminium foil M2 8,000.00
H BAHAN BESI
1 Pipa Gip 1,5" btg 500,000.00
2 Engsel besi bubut besar pcs 50,000.00
3 Plat besi 1,2mm lbr 75,000.00
4 Grendel besar pcs 25,000.00
5 Plat strip 1,6mm btg 12,500.00
6 Plat strip 3 mm btg 25,000.00
7 Plat strip 3 mm m1 4,166.67
8 Besi Siku kg 8,000.00
9 Mur/baut kg 8,000.00
K UPAH KERJA
0
0
0
0
PLAFOND
JLH PANJANG LEBAR JUMLAH LUAS
LT 1
GYPSUM A 1 1 3.000 2.500 1.00 7.500
3.830 2.500 1.00 9.575
4.500 4.000 1.00 16.000
LT 2
GYPSUM A 1 1 3.000 2.500 1.00 7.500
3.830 3.000 1.00 11.490
4.500 4.000 1.00 16.000
33.08
2.25
37.49
6.00
34.99
2.25
40.49
6.00
BACK UP DATA
KEGIATAN
PEKERJAAN
LOKASI
TH ANGGARAN
LANTAI 1
LANTAI KERJA BETON TUMBUK & LANTAI KERJA 1 : 3 : 5
F1 ØFOOTPLAT F1 1x1 ARS 02
AS F1 = 14.00 ttk
F2 = - ttk
F3 = - ttk
14.00 ttk
J = 14.00 ttk
L = 1.00 m
P = 1.00 m
T = 0.05 m
V1 = (LxPxT)xJ V1 0.700 m³
TOTAL 0.700 m3
V1 = (LxPxT)xJ V1 0.700 m³
TOTAL 0.700 m3
V1 = (LxPxT) V1 0.200 m³
V2 = ( La + Lb ) xT
2
La = 1.00 x 1.00 = 1.00 m²
Lb = 0.25 x 0.25 = 0.06 m²
T = 0.10
V2 = ( La + Lb ) xT V2 0.053 m³
2
V/ttk = ( V1 + V2 ) V/ ttk 0.253 m³
V total = ( Vttk x J ) V Total 3.544 m³
3.544 m3
Ptotal = 40.320 m¹
T = 0.300 m¹
L = 0.200 m¹
V Total = (TxL)xP Vtotal 2.419 m3
J = 14.00 ttk
t = 3.30 m1
L = 0.25 m1
p = 0.25 m1
K ØKOLOM K P 15 x L 15
praktis AS D = 3.00 ttk I = ttk
L1 H = ttk
3.00 ttk + 0.00 ttk
J = 3.00 ttk
t = 3.30 m1
L = 0.15 m1
p = 0.15 m1
P total = 42.22 m1
L = 0.15 m1
p = 0.25 m1
V total = ( p x L ) x Ptotal V total 1.583 m3
P total = 8.00
L = 0.15
P = 0.15
V total = ( P x L ) x Ptotal V total 0.180 m3
P total = 7.83
L = 0.15
P = 0.15
V total = ( P x L ) x Ptotal V total 0.176 m3
Ptotal = 43.820 m¹
P = 0.250 m¹
L = 0.150 m¹
V Total = ( P x L ) x Ptotal Vtotal 1.6433 m3
P = 1.000 m¹
T = 0.300 m¹
L = 0.200 m¹
1 V Total = (TxL)xP Vtotal 0.060 m3
ØBALOK TANGGA L 20 x T 40
P = 1.000 m¹
T = 0.400 m¹
L = 0.200 m¹
2 V Total = (TxL)xP Vtotal 0.080 m3
ØPLAT BORDES 20 CM
P = 1.000 m¹
T = 0.150 m¹
L = 1.380 m¹
3 V Total = (TxL)xP Vtotal 0.207 m3
ØPLAT T 20 CM
P = 8.000 m¹
T = 0.150 m¹
L = 1.250 m¹
V = (TxL)xP V 1.500 m3
ØANAK TANGGA 20 BH
P = 0.300 m¹
T = 0.150 m¹
L = 1.000 m¹
V = (TxL)xP V 0.450 m3
2
ØFOOTPLAT
P = 1.250 m¹
T = 0.800 m¹
t = 0.250 m¹
V = (TxL)xP V 0.250 m3
P = 1.250 m¹
T = 0.700 m¹
t = 0.200 m¹
V = (TxL)xP V 0.175 m3
34.240 m2
LS 0.00 34.24 m2
L total = ( LS x t )
= 34.24 m2
T = 0.12 m
TOTAL 3.286 M3
3.750 m2
LS 0.00 3.75 m2
L total = ( LS x t )
= 3.75 m2
T = 0.07 m
TP 2
L1 = 0.600 x 2.90 = 1.740 m2
L2 = 0.600 x = 0.000 m2
L3 = 0.600 x = 0.000 m2
L4 = 0.600 x = 0.000 m2
1.740 m2
LS 0.00 1.74 m2
L total = ( LS x t )
= 1.74 m2
T = 0.07 m
T0TAL 0.384 M3
LANTAI 2 1.44
Kp ØKOLOM Kp P 15 x L 15
AS 2/3 = 15.00 ttk
15.00 ttk +
J = 15.00 ttk
t = 3.30 m1
L = 0.15 m1
p = 0.15 m1
602.2
BACK UP PERHITUNGAN BAJA
BAJA L
TIPE JUMLAH L 12 L70 L50 C 125.50.2,3 PLAT 10 MM PLAT 8 MM VOL TOTAL SAT angkur buhul
21.67 7.38 3.75 4.52 80.9 64.9
Jumlah TL Ptotal Jumlah TL Ptotal Jumlah TL Ptotal
KUDA JL 1
4.00 2.00 11.46 2 10.86 2.00 13.69 3,038.58 KG 544.00 52.00
KUDA JL 2
2.00 4 7.13 2.00 8.38 546.66 KG 168.00 18.00
KUDA2 KD2
2.00 4 16.17 4.00 12.72 1,336.28 KG 592.00 56.00
KUDA2 KD4
2.00 2.00 8.66 2 7.85 2.00 12.25 1,166.13 KG 52.00 24.00
KUDA2 KD5
1.00 2 21.31 2.00 10.72 394.94 KG 26.00 19.00
KUDA2 MEMANJANG
1.00 2 30.00 2.00 28.32 655.20 KG 56.00 18.00
KUDA2 6
4.00 2 11.01 2.00 5.89 826.73 KG 56.00 36.00
50,313.62
KUDA2 7 905,645,102.40
4.00 2 5.49 2.00 2.27 392.23 KG 56.00 24.00 202,145,444.80
67,704,000.00
KUDA2 8
1.00 2 21.48 4.00 6.60 416.04 KG 56.00 22.00
18,053.72 507.00
GORDING ###
C 125.50.2,3 1,203.90 5,441.63 KG
GORDING JL1
C 125.50.2,3 91.68 414.39 KG
92.80
GORDING JL2 136.10
C 125.50.2,3 30.56 138.13 KG 172.40
401.30
GORDING JD 601.95
C 125.50.2,3 30.56 138.13 KG 1,203.90
1,356.70 6,132.28
PIPA Ø 3"
37.00 - M1
PLAT LANDAS
10 MM 3.72 300.95 KG
PLAT BUHUL
10 MM 20.28 1,640.65 KG
ANGKUR Ø 16
p 40 cm 117.60 - 185.81 KG
MUR BAUT
2,598.00 - 324.75 KG
51,049.17
KAIT ANGIN
DIA 16 MM - 537.20 KG
TRACKSTANG
DIA 10 MM - 175.09 KG
GRIIL BESI
71.12 - 266.70 KG
14.40 54.00 816,786,796.80
320.70
106.68 66.14
711.20 440.94
507.09
GENTENG
642.67 M2 64,266,600.00
USUK / RENG
642.67 M2 57,197,274.00
ALUMINIUM FOIL
642.67 M2 5,783,994.00
944,034,664.80 96,399,900.00
546,266,100.00
42239.7328
675835724.8
644.8
77,376,000.00
61,900,800.00
4,836,000.00
58,032,000.00
202,145,444.80
67,704,000.00
480
336,000,000.00
31.50
16.50
223.20
143.55
223.20
52.72
642.67
3.65
Plat leufel
2.22
BACK UP PERHITUNGAN PEMBESIAN
GEDUNG AULA 6361.32
4.716
LT 1
TULANGAN JML. BEGEL BERAT BERAT BERAT
TIPE PANJANG/m3 D.22 D.19 D.16 D.13 Ø 12 Ø 10 O.8 O.10 0.6 TL POKOK TL BEUGEL KG/M3 RERATA OVERSTEK BOBOT/TL BOBOT TOTAL
2.983 2.222 1.578 1.04 0.887 0.62 0.393 0.62 0.22 KG KG KG/M3 10% Kg/m3 Kg/m3
Jumlah TL Ptotal Jumlah TL Ptotal Jumlah TL Ptotal Jumlah TL Ptotal J/m1 P/Beugel Ptotal J/m1 P/Beugel Ptotal J/m1 P/Beugel Ptotal
Sloof S1 20/30
TUMPUAN 16.67 6 50.00 6.30 1.10 57.75 78.90 22.70 101.60 203.19
LAPANGAN 16.67 6 50.00 6.30 1.10 57.75 78.90 22.70 101.60
BESI ULIR 157.80 157.80 203.19
BESI POLOS 45.39 45.39
- - - -
Sloof S2 20/30
TUMPUAN 16.67 4 33.33 5.00 1.10 45.83 52.60 18.01 70.61 145.91
LAPANGAN 16.67 4 33.33 6.30 1.10 57.75 52.60 22.70 75.30
BESI ULIR 105.20 10.52 115.72 156.43
BESI POLOS 40.71 40.71
Sloof TG 20/40
TUMPUAN 12.50 7 43.75 10.00 1.10 68.75 69.04 27.02 96.06 182.12
LAPANGAN 12.50 7 43.75 6.30 1.10 43.31 69.04 17.02 86.06
BESI ULIR 138.08 13.81 151.88 195.92
BESI POLOS 44.04 44.04
Kolom K0 20/60
8.33 6 50.00 6.30 1.50 78.75 78.90 30.95 109.85 109.85
BESI ULIR 78.90 78.90 109.85
BESI POLOS 30.95 30.95
Kolom K1 50/30
6.67 12 80.00 6.30 1.60 67.20 126.24 26.41 152.65 152.65
BESI ULIR 126.24 12.62 138.86 165.27
BESI POLOS 26.41 26.41
Kolom K2 50/30
6.67 10 66.67 6.30 1.60 67.20 105.20 26.41 131.61 131.61
BESI ULIR 105.20 10.52 115.72 142.13
BESI POLOS 26.41 26.41
Kolom K3 30/30
11.11 8 88.89 6.30 1.20 84.00 140.27 33.01 173.28 173.28
BESI ULIR 140.27 14.03 154.29 187.31
BESI POLOS 33.01 33.01
Kolom K4 30/30
11.11 8 88.89 6.30 1.20 84.00 92.44 33.01 125.46 125.46
BESI ULIR 92.44 9.24 101.69 134.70
BESI POLOS 33.01 33.01
Kolom Kp 15/15
44.44 4.00 177.78 6.30 0.52 145.60 110.22 32.03 142.25 142.25 142.25 142.25
BESI ULIR - 142.25
BESI POLOS 110.22 32.03 142.25
Balok B1 25/50
TUMPUAN 8.00 9 36.00 2 8.00 10.00 1.50 60.00 87.09 37.20 124.29 199.00
LAPANGAN 8.00 7 28.00 2 8.00 6.30 1.50 37.80 51.28 23.44 74.72
BESI ULIR 138.37 13.84 152.20 212.84
BESI POLOS 60.64 60.64
Balok B2 25/50
TUMPUAN 8.00 12.00 48 2.00 8.00 10.00 2.70 108.00 113.75 66.96 180.71 296.11
LAPANGAN 8.00 8.00 32 2.00 8.00 10.00 1.50 60.00 78.20 37.20 115.40
BESI ULIR 191.95 19.20 211.15 315.31
BESI POLOS 104.16 104.16
Balok B3 25/50
TUMPUAN 8.00 6 24.00 2.00 8.00 10.00 1.50 60.00 60.42 37.20 97.62 181.48
LAPANGAN 8.00 6 24.00 2.00 8.00 6.30 1.50 37.80 60.42 23.44 83.86
BESI ULIR 120.85 12.08 132.93 193.57
BESI POLOS 60.64 60.64
Balok B4 25/50
TUMPUAN 8.00 5 20.00 2.00 8.00 10.00 1.50 60.00 51.54 37.20 88.74 163.71
LAPANGAN 8.00 5 20.00 2.00 8.00 6.30 1.50 37.80 51.54 23.44 74.97
BESI ULIR 103.07 10.31 113.38 174.02
BESI POLOS 60.64 60.64
Balok B5 20/50
TUMPUAN 10.00 5 25.00 2.00 10.00 10.00 1.50 75.00 64.42 29.48 93.90 176.88
LAPANGAN 10.00 5 25.00 2.00 10.00 6.30 1.50 47.25 64.42 18.57 82.99
BESI ULIR 128.84 12.88 141.72 189.77
BESI POLOS 48.04 48.04
Balok B6 20/30
TUMPUAN 16.67 4 33.33 10.00 1.20 100.00 52.60 39.30 91.90 169.26
LAPANGAN 16.67 4 33.33 6.30 1.20 63.00 52.60 24.76 77.36
BESI ULIR 105.20 10.52 115.72 179.78
BESI POLOS 64.06 64.06
Plat LT t = 12 cm
T Melintang 8.33 3.30 68.75 42.63 - 42.63 85.25 85.25 85.25
Tmemanjang 8.33 3.30 68.75 42.63 - 42.63
KONSOL/BORDES
BA 6 20/25
TUMPUAN 16.67 5 41.67 10.00 0.90 75.00 65.75 29.48 95.23 177.30 17.73 195.03 212.76
LAPANGAN 16.67 4 33.33 10.00 0.90 75.00 52.60 29.48 82.08
BR1 20/40
TUMPUAN 12.50 6 37.50 2.00 12.50 10.00 1.20 75.00 70.26 29.48 99.74 188.57 18.86 207.43 226.28
LAPANGAN 12.50 6 37.50 2.00 12.50 6.30 1.20 47.25 70.26 18.57 88.83
BALOK ATAP
Balok B5 20/40
TUMPUAN 12.50 6 37.50 10.00 1.15 71.88 59.18 28.25 87.42 144.67 14.47 159.13 173.60
LAPANGAN 12.50 4 25.00 6.30 1.15 45.28 39.45 17.80 57.25
Balok B6 15/30
TUMPUAN 22.22 4 44.44 6.30 0.85 59.50 70.13 23.38 93.52 182.21 18.22 200.43 218.65
LAPANGAN 22.22 4 44.44 5.00 0.85 47.22 70.13 18.56 88.69
Balok B7 15/25
TUMPUAN 26.67 4 53.33 6.30 0.85 71.40 84.16 28.06 112.22 218.65 21.87 240.52 262.38
LAPANGAN 26.67 4 53.33 5.00 0.85 56.67 84.16 22.27 106.43
Plat LT t = 10 cm
T Melintang 10.00 10.00 100.00 39.30 #REF! #REF! #REF! #REF! #REF!
Tmemanjang 10.00 10.00 100.00 39.30 #REF! #REF!
0.43
0.54
BACK UP PERHITUNGAN PEMBESIAN
GEDUNG AULA
LT 1
TULANGAN JML. BEGEL BERAT BERAT BERAT
TIPE PANJANG/m3 D.22 D.19 D.16 D.13 Ø 12 Ø 10 O.8 O.10 0.6 TL POKOK TL BEUGEL KG/M3 RERATA OVERSTEK BOBOT/TL BOBOT TOTAL
2.983 2.222 1.578 1.04 0.887 0.62 0.393 0.62 0.22 KG KG KG/M3 10% Kg/m3 Kg/m3
Jumlah TL Ptotal Jumlah TL Ptotal Jumlah TL Ptotal Jumlah TL Ptotal J/m1 P/Beugel Ptotal J/m1 P/Beugel Ptotal J/m1 P/Beugel Ptotal
Sloof S1 20/30
TUMPUAN 16.67 6 50.00 6.30 0.90 47.25 78.90 18.57 97.47 194.94
LAPANGAN 16.67 6 50.00 6.30 0.90 47.25 78.90 18.57 97.47
BESI ULIR 157.80 157.80 194.94
BESI POLOS 37.14 37.14
- - - -
Sloof S2 20/30
TUMPUAN 16.67 4 33.33 5.00 0.90 37.50 52.60 14.74 67.34 138.51
LAPANGAN 16.67 4 33.33 6.30 0.90 47.25 52.60 18.57 71.17
BESI ULIR 105.20 10.52 115.72 149.03
BESI POLOS 33.31 33.31
Sloof TG 20/40
TUMPUAN 12.50 7 43.75 10.00 0.90 56.25 69.04 22.11 91.14 174.11
LAPANGAN 12.50 7 43.75 6.30 0.90 35.44 69.04 13.93 82.96
BESI ULIR 138.08 13.81 151.88 187.92
BESI POLOS 36.03 36.03
Kolom K0 20/60
8.33 6 50.00 6.30 1.50 78.75 78.90 30.95 109.85 109.85
BESI ULIR 78.90 78.90 109.85
BESI POLOS 30.95 30.95
Kolom K1 50/30
6.67 12 80.00 6.30 1.60 67.20 126.24 26.41 152.65 152.65
BESI ULIR 126.24 12.62 138.86 165.27
BESI POLOS 26.41 26.41
Kolom K2 50/30
6.67 10 66.67 6.30 1.60 67.20 105.20 26.41 131.61 131.61
BESI ULIR 105.20 10.52 115.72 142.13
BESI POLOS 26.41 26.41
Kolom K3 30/30
11.11 8 88.89 6.30 1.20 84.00 140.27 33.01 173.28 173.28
BESI ULIR 140.27 14.03 154.29 187.31
BESI POLOS 33.01 33.01
Kolom K4 30/30
11.11 8 88.89 6.30 1.20 84.00 92.44 33.01 125.46 125.46
BESI ULIR 92.44 9.24 101.69 134.70
BESI POLOS 33.01 33.01
Kolom K5 15/30
22.22 6.00 133.33 10.00 0.90 200.00 82.67 78.60 161.27 161.27
BESI ULIR 82.67 8.27 90.93 169.53
BESI POLOS 78.60 78.60
Kolom K6 15/40
16.67 4 66.67 2.00 33.33 6.30 1.10 115.50 134.77 45.39 180.16 180.16
BESI ULIR 134.77 13.48 148.24 193.63
BESI POLOS 45.39 45.39
Kolom Kp 15/15
44.44 4.00 177.78 6.30 0.52 145.60 110.22 32.03 142.25 142.25 142.25 142.25
BESI ULIR - 142.25
BESI POLOS 110.22 32.03 142.25
Balok B1 25/50
TUMPUAN 8.00 9 36.00 2 8.00 10.00 1.50 60.00 87.09 37.20 124.29 199.00
LAPANGAN 8.00 7 28.00 2 8.00 6.30 1.50 37.80 51.28 23.44 74.72
BESI ULIR 138.37 13.84 152.20 212.84
BESI POLOS 60.64 60.64
Balok B2 25/50
TUMPUAN 8.00 12.00 48 2.00 8.00 10.00 2.70 108.00 113.75 66.96 180.71 296.11
LAPANGAN 8.00 8.00 32 2.00 8.00 10.00 1.50 60.00 78.20 37.20 115.40
BESI ULIR 191.95 19.20 211.15 315.31
BESI POLOS 104.16 104.16
Balok B3 25/50
TUMPUAN 8.00 6 24.00 2.00 8.00 10.00 1.50 60.00 60.42 37.20 97.62 181.48
LAPANGAN 8.00 6 24.00 2.00 8.00 6.30 1.50 37.80 60.42 23.44 83.86
BESI ULIR 120.85 12.08 132.93 193.57
BESI POLOS 60.64 60.64
Balok B4 25/50
TUMPUAN 8.00 5 20.00 2.00 8.00 10.00 1.50 60.00 51.54 37.20 88.74 163.71
LAPANGAN 8.00 5 20.00 2.00 8.00 6.30 1.50 37.80 51.54 23.44 74.97
BESI ULIR 103.07 10.31 113.38 174.02
BESI POLOS 60.64 60.64
Balok B5 20/50
TUMPUAN 10.00 5 25.00 2.00 10.00 10.00 1.50 75.00 64.42 29.48 93.90 176.88
LAPANGAN 10.00 5 25.00 2.00 10.00 6.30 1.50 47.25 64.42 18.57 82.99
BESI ULIR 128.84 12.88 141.72 189.77
BESI POLOS 48.04 48.04
Balok B6 20/30
TUMPUAN 16.67 4 33.33 10.00 1.20 100.00 52.60 39.30 91.90 169.26
LAPANGAN 16.67 4 33.33 6.30 1.20 63.00 52.60 24.76 77.36
BESI ULIR 105.20 10.52 115.72 179.78
BESI POLOS 64.06 64.06
Plat LT t = 12 cm
T Melintang 8.33 3.30 68.75 42.63 - 42.63 85.25 85.25 85.25
Tmemanjang 8.33 3.30 68.75 42.63 - 42.63
KONSOL/BORDES
BA 6 20/25
TUMPUAN 16.67 5 41.67 10.00 0.90 75.00 65.75 29.48 95.23 177.30 17.73 195.03 212.76
LAPANGAN 16.67 4 33.33 10.00 0.90 75.00 52.60 29.48 82.08
BR1 20/40
TUMPUAN 12.50 6 37.50 2.00 12.50 10.00 1.20 75.00 70.26 29.48 99.74 188.57 18.86 207.43 226.28
LAPANGAN 12.50 6 37.50 2.00 12.50 6.30 1.20 47.25 70.26 18.57 88.83
BALOK ATAP
LT 1 -
POLOS KACA MATI P4 1.000 0.400 1.600 1.00 0.640
-
P0LOS KACA MATI j1 6.000 1.950 0.850 1.00 9.945
LT 2 -
POLOS KACA MATI
-
P0LOS KACA MATI j1 6.000 1.950 0.850 1.00 9.945
TOTAL 38.465
25.536
KERAMIK
JLH PANJANG LEBAR JUMLAH LUAS
LT 1
PARQUET 1 1.000 2.800 2.600 7.280
(L1) 1.000 1.000 0.750 0.750
2 1.000 2.800 2.600 7.280
1.000 1.000 0.800 0.800
3/4 2.000 2.800 2.000 11.200
2.000 1.000 0.750 1.500
5/6 2.000 2.800 2.000 11.200
7/8 2.000 3.500 2.000 14.000
2.000 0.750 1.000 1.500
9 1.000 2.500 2.000 5.000
1.000 0.750 1.000 0.750
10 1.000 2.500 2.000 5.000
11 1.000 3.500 2.000 7.000
73.260
56.800
27.25
26.17
63.66
LT 1
-
PRTSY TP1 TP 1 1.000 3.000 3.600 10.800 10.800
PRTSY TP2 TP 2 1.000 3.000 3.600 10.800 10.800
PRTSY TP3 TP3 1.000 3.000 3.850 11.550 11.550
LT 2
-
PRTSY TP1 TP 1 3.000 3.000 3.600 32.400 32.400
PRTSY TP4 TP 4 5.000 3.000 1.400 21.000
5.000 0.400 1.700 3.400 24.400
PRTSY TP5 TP 5 1.000 3.000 3.720 11.160
PINTU 1.000 1.800 1.450 2.610
1.000 0.800 0.800 0.640 -
7.91
LT 1 JLH KUSEN AMBANG T SP JML AMBANG T TGH JML AMBANG BWH JLH AMBANG TGH JML AMBANG ATAS JML PANJANG TTL JUMLAH/UNIT JML TOTAL
KUSEN JENDELA J1 6.000 2.100 2.00 0.850 1.00 0.850 2.00 - 1 - 1.00 40.500
ENGSEL 6.000 - -
SPRINGKNEEP 6.000 - -
KAIT ANGIN 6.000 - -
HANDEL 6.000 - -
DOORCLOSER 6.000 - -
KUSEN JENDELA J2 4.000 2.100 5.00 3.450 3.00 - 1.00 - 1 - 1.00 83.400
ENGSEL 4.000 8.000 32.000
SPRINGKNEEP 4.000 4.000 16.000
KAIT ANGIN 4.000 8.000 32.000
HANDEL 4.000 - -
DOORCLOSER 4.000 - -
KUSEN JENDELA J3 1.000 2.100 5.00 2.650 2.00 - 1.00 - 1 - 1.00 15.800
ENGSEL 1.000 - -
SPRINGKNEEP 1.000 - -
KAIT ANGIN 1.000 - -
HANDEL 1.000 - -
DOORCLOSER 1.000 - -
KUSEN JENDELA J4 2.000 2.100 2.00 0.750 3.00 - 1.00 - 1 - 1.00 12.900
ENGSEL 2.000 - -
SPRINGKNEEP 2.000 - -
KAIT ANGIN 2.000 - -
HANDEL 2.000 - -
DOORCLOSER 2.000 - -
KUSEN JENDELA JP 6.000 5.600 2.00 0.500 4.00 - 1.00 - 1 - 1.00 79.200
ENGSEL 6.000 - -
SPRINGKNEEP 6.000 - -
KAIT ANGIN 6.000 - -
HANDEL 6.000 - -
DOORCLOSER 6.000 - -
KUSEN JENDELA JS 2.000 19.200 1.00 26.400 1.00 - 1.00 - 1 - 1.00 91.200
ENGSEL 2.000 - -
SPRINGKNEEP 2.000 - -
KAIT ANGIN 2.000 - -
HANDEL 2.000 - -
DOORCLOSER 2.000 - -
KUSEN BOUVEN B2 4.000 0.400 3.00 1.350 2.00 - 1.00 - 0 - 1.00 15.600
ENGSEL 4.000 4.000 16.000
SPRINGKNEEP 4.000 2.000 8.000
KAIT ANGIN 4.000 4.000 16.000
HANDEL 4.000 - -
DOORCLOSER 4.000 - -
KUSEN BOUVEN B1 1.000 0.500 2.00 0.700 2.00 - 1.00 - 0 - 1.00 2.400
ENGSEL 1.000 2.000 2.000
SPRINGKNEEP 1.000 1.000 1.000
KAIT ANGIN 1.000 2.000 2.000
HANDEL 1.000 - -
DOORCLOSER 1.000 - -
LT 2 JLH KUSEN AMBANG T SP JML AMBANG T TGH JML AMBANG BWH JLH AMBANG TGH JML AMBANG ATAS JML PANJANG TTL JUMLAH/UNIT JML TOTAL
KUSEN JENDELA J1 6.000 2.100 2.00 0.850 1.00 0.850 2.00 - 1 - 1.00 40.500
ENGSEL 6.000 - -
SPRINGKNEEP 6.000 - -
KAIT ANGIN 6.000 - -
HANDEL 6.000 - -
DOORCLOSER 6.000 - -
KUSEN JENDELA J2 4.000 2.100 5.00 3.450 3.00 - 1.00 - 1 - 1.00 83.400
ENGSEL 4.000 8.000 32.000
SPRINGKNEEP 4.000 4.000 16.000
KAIT ANGIN 4.000 8.000 32.000
HANDEL 4.000 - -
DOORCLOSER 4.000 - -
KUSEN JENDELA JA 6.000 1.500 2.00 0.850 2.00 - 1.00 - 1 - 1.00 28.200
ENGSEL 6.000 - -
SPRINGKNEEP 6.000 - -
KAIT ANGIN 6.000 - -
HANDEL 6.000 - -
DOORCLOSER 6.000 - -
KUSEN JENDELA JB 1.000 1.400 3.00 3.150 2.00 - 1.00 - 1 - 1.00 10.500
ENGSEL 1.000 - -
SPRINGKNEEP 1.000 - -
KAIT ANGIN 1.000 - -
HANDEL 1.000 - -
DOORCLOSER 1.000 - -
KUSEN JENDELA JN 2.000 1.400 2.00 1.500 2.00 - 1.00 - 1 - 1.00 11.600
ENGSEL 2.000 - -
SPRINGKNEEP 2.000 - -
KAIT ANGIN 2.000 - -
HANDEL 2.000 - -
DOORCLOSER 2.000 - -
KUSEN BOUVEN B2 4.000 0.400 3.00 1.350 2.00 - 1.00 - 0 - 1.00 15.600
ENGSEL 4.000 4.000 16.000
SPRINGKNEEP 4.000 2.000 8.000
KAIT ANGIN 4.000 4.000 16.000
HANDEL 4.000 - -
DOORCLOSER 4.000 - -
KUSEN BOUVEN B1 2.000 0.500 2.00 0.700 2.00 - 1.00 - 0 - 1.00 4.800
ENGSEL 2.000 2.000 4.000
SPRINGKNEEP 2.000 1.000 2.000
KAIT ANGIN 2.000 2.000 4.000
HANDEL 2.000 - -
DOORCLOSER 2.000 - -
KUSEN PINTU P2 5.000 2.600 2.00 - - 1.600 1 1.600 1.00 42.000
ENGSEL 5.000 6.000 30.000
SPRINGKNEEP 5.000 -
KAIT ANGIN 5.000 -
HANDEL 5.000 2.000 10.000
DOORCLOSER 5.000 2.000 10.000
13.000
KUSEN PINTU P3 2.000 2.600 2.00 - - 1.500 1 1.500 1.00 16.400
ENGSEL 2.000 6.000 12.000
SPRINGKNEEP 2.000 -
KAIT ANGIN 2.000 -
HANDEL 2.000 2.000 4.000
DOORCLOSER 2.000 2.000 4.000
KUSEN PINTU PJ2 1.000 2.600 2.00 1.750 1.00 - - 0.600 1 1.700 2.00 10.950
ENGSEL 1.000 3.000 3.000
SPRINGKNEEP 1.000 -
KAIT ANGIN 1.000 -
HANDEL 1.000 2.000 2.000
DOORCLOSER 1.000 1.000 1.000
KUSEN JENDELA J1 14.000 2.100 2.00 2.100 2.00 2.600 1.00 2.600 1 2.600 1.00 226.800
ENGSEL 14.000 6.000 84.000
SPRINGKNEEP 14.000 2.000 28.000
KAIT ANGIN 14.000 6.000 84.000
HANDEL 14.000 - -
DOORCLOSER 14.000 - -
KUSEN JENDELA J2 1.000 2.100 2.00 2.100 2.00 2.600 1.00 2.600 1 2.600 1.00 16.200
ENGSEL 1.000 4.000 4.000
SPRINGKNEEP 1.000 2.000 2.000
KAIT ANGIN 1.000 4.000 4.000
HANDEL 1.000 - -
DOORCLOSER 1.000 - -
KUSEN JENDELA J3 1.000 2.000 2.00 2.000 1.00 1.550 1.00 1.550 1 1.550 1.00 10.650
ENGSEL 1.000 2.000 2.000
SPRINGKNEEP 1.000 1.000 1.000
KAIT ANGIN 1.000 2.000 2.000
HANDEL 1.000 - -
DOORCLOSER 1.000 - -
KUSEN JENDELA J6 4.000 3.240 2.00 1.030 1.00 1.030 1.00 34.160
ENGSEL 4.000 -
SPRINGKNEEP 2.000 -
KAIT ANGIN 4.000 -
HANDEL - -
DOORCLOSER - -
KUSEN JENDELA JP 2.000 2.100 2.00 2.100 1.00 1.650 1.00 1.650 1 1.650 1.00 22.500
ENGSEL 2.000 4.000 8.000
SPRINGKNEEP 2.000 1.000 2.000
KAIT ANGIN 2.000 4.000 8.000
HANDEL 2.000 - -
DOORCLOSER 2.000 - -
KUSEN BOUVEN BV1 2.000 0.500 2.00 0.500 1.00 1.350 1.00 - 0 1.350 1.00 8.400
ENGSEL 2.000 4.000 8.000
SPRINGKNEEP 2.000 2.000 4.000
KAIT ANGIN 2.000 4.000 8.000
HANDEL 2.000 - -
DOORCLOSER 2.000 - -
KUSEN BOUVEN BV2 2.000 0.500 2.00 - - 0.900 1.00 - 0 0.900 1.00 5.600
ENGSEL 2.000 2.000 4.000
SPRINGKNEEP 2.000 1.000 2.000
KAIT ANGIN 2.000 2.000 4.000
HANDEL 2.000 - -
DOORCLOSER 2.000 - -