Anda di halaman 1dari 77

R E K A P I T U LA S I

RENCANA ANGGARAN BIAYA

PEKERJAAN : PEMBANGUNAN RUANG GURU, RUANG KESENIAN DAN AULA


LOKASI : SALATIGA
TH ANGGARAN #REF!

NO U R A I A N P E K E R J AA N JUMLAH SUB JUMLAH

A. PEK. PERSIAPAN
I. PEK. PERSIAPAN Rp. #REF!

TOTAL A Rp. #REF!

B. LANTAI I
I. PEK. TANAH Rp. 1,826,064.24
II. PEK. PASANGAN Rp. 19,540,490.77
III. PEK. BETON Rp. 35,683,658.62
IV. PEK. LANTAI Rp. 6,207,203.48
V. PEK. PENUTUP LANGIT - LANGIT Rp. 3,051,784.38
VI. PEK. MEKANIKAL ELEKTRIKAL Rp. 4,995,000.00
VII. PEK. KUSEN ALUMUNIUM Rp. 8,400,000.00
VIII. PEK. ACCESORIS Rp. 3,835,000.00
IX. PEK. PENGECATAN Rp. 185,019.64

TOTAL B Rp. 83,724,221.12

C. LANTAI 2
I. PEK. PASANGAN Rp. 14,522,410.93
II. PEK. BETON Rp. 6,157,214.08
III. PEK. LANTAI Rp. 5,497,950.67
IV. PEK. PENUTUP LANGIT - LANGIT Rp. #REF!
V. PEK. KUSEN ALUMUNIUM Rp. #REF!
VI. PEK. MEKANIKAL ELEKTRIKAL Rp. #REF!
VII. PEK. PENGECATAN Rp. 3,360,917.32
VIII. PEK. ATAP Rp. 9,906,708.32

TOTAL C Rp. #REF!

JUMLAH TOTAL ( A + B + C ) Rp. #REF!


PEMBULATAN Rp. 1,500,000,000.00
Terbilang : Satu milyar lima ratus juta rupiah
RENCANA ANGGARAN BIAYA

PEKERJAAN : PEMBANGUNAN PERUMAHAN TYPE HARMONI


LOKASI : SALATIGA

HARGA SATUAN
NO U R A I A N P E K E R J AA N VOL SAT UPAH + BAHAN
( RP. )
1 2 3 4 5
A. PEK. PERSIAPAN
1 UITZET DAN BOUWPLANK 1.00 LS 500,000.00
SUB TOTAL
B. LANTAI I
I. PEK. TANAH
1 GALIAN TANAH PONDASI DAN FOOTPLAT 46.80 M3 22,625.00
2 URUGAN TANAH KEMBALI BEKAS GALIAN 40.10 M3 7,775.00
3 URUGAN PASIR URUG BAWAH PONDASI 4.03 M3 69,050.00
4 URUGAN PASIR URUG BAWAH FOOTPLAT 0.70 M3 69,050.00
5 URUGAN PASIR URUG BAWAH LANTAI 1.86 M3 69,050.00
SUB TOTAL
II. PEK. PASANGAN
1 PASANGAN PONDASI BATU BELAH 1 : 4 12.10 M3 414,725.00
2 PASANGAN AANSTAMPING 6.45 M3 155,025.00
3 PAS. BATU BATA 1 : 3 14.77 M2 62,924.00
4 PAS. BATU BATA 1 : 5 118.12 M2 56,716.00
5 PLESTERAN 1 : 3 t 15 mm 29.53 M2 23,066.20
6 PLESTERAN 1 : 5 t 15 mm 236.25 M2 20,240.80
7 PLESTERAN SUDUT, SPONENGAN DAN TALI AIR 80.65 M1 5,360.40
SUB TOTAL
III. PEK. BETON
1 PEK. RABAT BETON BAWAH LANTAI 1 : 3 : 5 1.86 M3 569,533.48
2 BETON LANTAI KERJA 1 : 3 : 5 0.70 M3 569,533.48
3 BETON POOR/FOOTPLAT 3.54 M3 1,771,060.00
4 BETON SLOOF STRUKTUR 20/30 2.42 M3 1,945,620.60
5 BETON KOLOM 30/30 2.89 M3 2,136,614.18
6 BETON KOLOM PRAKTIS 15/15 0.22 M3 1,874,205.71
7 BETON BALOK STRUKTUR 15/25 1.58 M3 2,372,745.00
8 BETON BALOK LATIO 0.18 M3 2,110,627.50
9 BETON PLAT LEUVEL 0.38 M3 1,958,437.50
10 BETON PLAT LANTAI 2 3.29 M3 1,958,437.50
11 BETON TANGGA 2.72 M3 1,958,437.50
SUB TOTAL
IV. PEK. KERAMIK
1 GRANIT 60/60 33.08 M2 139,633.00
2 KERAMIK LANTAI KM 20/20 TEKSTUR 2.25 M2 95,776.00
3 KERAMIK DINDING KM 20/25 4.80 M2 82,645.00
4 PAVING BLOCK 11.49 M2 85,000.00
SUB TOTAL
V. PEK. PENUTUP LANGIT - LANGIT
1 PLAFON GYPSUM RK HOLLO 33.08 M2 66,370.00
2 LIS TEPI PLAFOND GYPSUM 37.49 M1 17,525.00
3 PLAFOND KALSIBOARD RK HOLLO 2.25 M2 62,037.50
4 LIS TEPI PLAFOND KAYU PROFIL 6.00 M2 10,000.00
SUB TOTAL
VI. PEK. MEKANIKAL ELEKTRIKAL
1 INSTALASI TITIK LAMPU 9.00 TTK 115,000.00
2 INSTALASI TITIK STOP KONTAK 4.00 TTK 115,000.00
3 STOP KONTAK 4.00 TTK 50,000.00
4 SAKLAR TUNGGAL 5.00 BH 25,000.00
5 SAKLAR GANDA 2.00 BH 25,000.00
6 DOWN LIGHT DENGAN LAMPU SL 18 WATT 9.00 BH 125,000.00
7 PASANG BARU LISTRIK DAYA 1300 WATT 1.00 LS 2,000,000.00
SUB TOTAL
VII. PEK. KUSEN ALUMUNIUM
1 PINTU PJ1 1.00 UNIT 2,750,000.00
(terdiri dari kosen alumunium 4", daun jendela kaca alumunium jungkit, pasang kaca mati 5 mm,
daun pintu multipleks 6 mm finishing HPL, engsel pintu, engsel jendela, spring kneep jendela,
kait angin jendela, door closer pintu, handle pintu, kunci pintu dll)
2 PINTU P1 1.00 UNIT 1,800,000.00
(terdiri dari kosen alumunium 4", daun pintu multipleks 6 mm finishing HPL, engsel pintu,
door closer pintu, handle pintu, kunci pintu dll)
3 JENDELA JI 1.00 UNIT 1,250,000.00
(terdiri dari kosen alumunium 4", daun jendela kaca alumunium jungkit, pasang kaca mati 5 mm,
engsel jendela, spring kneep jendela, kait angin jendela dll)
4 JENDELA J2 1.00 UNIT 1,000,000.00
(terdiri dari kosen alumunium 4", daun jendela kaca alumunium jungkit, pasang kaca mati 5 mm,
engsel jendela, spring kneep jendela, kait angin jendela dll)
5 JENDELA J3 1.00 UNIT 800,000.00
(terdiri dari kosen alumunium 4", daun jendela kaca alumunium jungkit, pasang kaca mati 5 mm,
engsel jendela, spring kneep jendela, kait angin jendela dll)
6 BOUVENLIGHT KM 1.00 UNIT 500,000.00
(terdiri dari kosen alumunium 4", daun jendela kaca alumunium jungkit, pasang kaca mati 5 mm,
engsel jendela, spring kneep jendela, kait angin jendela dll)
7 PINTU PVC KM/ WC 1.00 UNIT 300,000.00
SUB TOTAL
VIII. PEK. SANITASI
1 CLOSET DUDUK 1.00 UNIT 950,000.00
2 KRAN AIR 2.00 BH 30,000.00
3 FLOOR DRAIN 1.00 BH 25,000.00
4 MEJA DAPUR 1.00 UNIT 300,000.00
5 INSTALASI AIR BERSIH 1.00 LS 500,000.00
6 INSTALASI AIR KOTOR 1.00 LS 500,000.00
7 SEPTICTANK 1.00 UNIT 1,500,000.00
SUB TOTAL
IX. PEK. PENGECATAN
1 CAT DINDING INTERIOR 147.65 M2 9,835.50
2 CAT DINDING EXTERIOR (147.65) M2 10,935.50
3 CAT PLAFOND 35.33 M2 9,835.50
SUB TOTAL
TOTAL B
C. LANTAI 2
I. PEK. PASANGAN
1 PAS. BATU BATA 1 : 3 15.93 M2 62,924.00
2 PAS. BATU BATA 1 : 5 127.41 M2 56,716.00
3 PLESTERAN 1 : 3 t 15 mm 31.85 M2 23,066.20
4 PLESTERAN 1 : 5 t 15 mm 254.81 M2 20,240.80
5 PLESTERAN SUDUT, SPONENGAN DAN TALI AIR 75.02 M1 5,360.40
SUB TOTAL
II. PEK. BETON
1 BETON KOLOM PRAKTIS 1.11 M3 1,874,205.71
2 BETON BALOK LATEI (GUNUNGAN) 0.29 M3 2,110,627.50
3 BETON BALOK RINGBALK 1.64 M3 2,110,627.50
SUB TOTAL
III. PEK. LANTAI
1 GRANIT 60/60 34.99 M2 139,633.00
2 KERAMIK LANTAI KM 20/20 TEKSTUR 2.25 M2 95,776.00
3 KERAMIK DINDING KM 20/25 4.80 M2 82,645.00
SUB TOTAL
IV. PEK. PENUTUP LANGIT - LANGIT
1 PLAFON GYPSUM RK HOLLO 34.99 M2 66,370.00
2 LIS TEPI PLAFOND GYPSUM 40.49 M1 17,525.00
3 PLAFOND KALSIBOARD RK HOLLO 2.25 M2 62,037.50
4 LIS TEPI PLAFOND KAYU PROFIL 6.00 M2 10,000.00
SUB TOTAL
V. PEK. KUSEN ALUMUNIUM
1 PINTU P1 2.00 UNIT 2,000,000.00
(terdiri dari kosen alumunium 4", daun pintu multipleks 6 mm finishing HPL, engsel pintu,
door closer pintu, handle pintu, kunci pintu dll)
2 JENDELA JI 1.00 UNIT 1,250,000.00
(terdiri dari kosen alumunium 4", daun jendela kaca alumunium jungkit, pasang kaca mati 5 mm,
engsel jendela, spring kneep jendela, kait angin jendela dll)
3 JENDELA J2 1.00 UNIT 1,000,000.00
(terdiri dari kosen alumunium 4", daun jendela kaca alumunium jungkit, pasang kaca mati 5 mm,
engsel jendela, spring kneep jendela, kait angin jendela dll)
4 JENDELA J3 2.00 UNIT 800,000.00
(terdiri dari kosen alumunium 4", daun jendela kaca alumunium jungkit, pasang kaca mati 5 mm,
engsel jendela, spring kneep jendela, kait angin jendela dll)
5 BOUVENLIGHT KM 1.00 UNIT 500,000.00
(terdiri dari kosen alumunium 4", daun jendela kaca alumunium jungkit, pasang kaca mati 5 mm,
engsel jendela, spring kneep jendela, kait angin jendela dll)
6 PINTU PVC KM/ WC 1.00 UNIT 300,000.00
SUB TOTAL
VI. PEK. SANITASI
1 CLOSET DUDUK 1.00 UNIT 950,000.00
2 KRAN AIR 2.00 BH 30,000.00
3 FLOOR DRAIN 1.00 BH 25,000.00
4 MEJA DAPUR 1.00 UNIT 300,000.00
5 INSTALASI AIR BERSIH 1.00 LS 500,000.00
6 INSTALASI AIR KOTOR 1.00 LS 500,000.00
7 SEPTICTANK 1.00 UNIT 1,500,000.00
SUB TOTAL
VII. PEK. MEKANIKAL ELEKTRIKAL
1 INSTALASI TITIK LAMPU 5.00 TTK 115,000.00
2 INSTALASI TITIK STOP KONTAK 3.00 TTK 115,000.00
3 STOP KONTAK 3.00 TTK 50,000.00
4 SAKLAR TUNGGAL 4.00 BH 25,000.00
5 SAKLAR GANDA 1.00 BH 25,000.00
6 DOWN LIGHT DENGAN LAMPU SL 18 WATT 5.00 BH 125,000.00
SUB TOTAL
VIII. PEK. PENGECATAN
1 CAT DINDING INTERIOR 127.41 M2 9,835.50
2 CAT DINDING EXSTERIOR 159.26 M2 10,935.50
3 CAT PLAFOND 37.24 M2 9,835.50
SUB TOTAL
IX. PEK. ATAP
1 KUDA KUDA BAJA RINGAN 52.14 M2 110,000.00
2 PENUTUP ATAP GENTENG MORANDO GLAZUR 52.14 M2 51,495.00
3 BUBUNGAN GENTENG 23.00 M1 44,435.00
4 LISTPLANG KALSIPLANK 15.50 M1 30,000.00
SUB TOTAL
TOTAL C

TOTAL ( A + B + C )
PEMBULATAN

Terbilang :
DAFTAR ANALISA PEKERJAAN

KEGIATAN : PENINGKATAN SARANA DAN PRASARANA BP DIKJUR JAWA TENGAH


PEKERJAAN : PEMBANGUNAN AULA DAN RUANG MAKAN BP DIKJUR SATKER PATI
LOKASI : SIDOWUNGU, SIDOKERTO, KAB. PATI
TH ANGGARAN : 2010

KODE URAIAN PEKERJAAN KOEF. SAT. HRG.SATUAN TOTAL


( Rp. ) ( Rp. )

6,1 1 m3 Galian tanah biasa 1 m


6,1,2 Tenaga
Pekerja 0.7500 OH X Rp 29,000.00 = Rp 21,750.00
Tukang Gali 0.0000 OH X Rp 32,500.00 = Rp 0.00
Kepala Tukang 0.0000 OH X Rp 35,000.00 = Rp 0.00
Mandor 0.0250 OH X Rp 35,000.00 = Rp 875.00
Jumlah = Rp 22,625.00

6,4 1 m3 Galian tanah Keras 1 m


6,4,2 Tenaga
Pekerja 1.0000 OH X Rp 29,000.00 = Rp 29,000.00
Tukang Gali 0.0000 OH X Rp 32,500.00 = Rp 0.00
Kepala Tukang 0.0000 OH X Rp 35,000.00 = Rp 0.00
Mandor 0.0320 OH X Rp 35,000.00 = Rp 1,120.00
Jumlah = Rp 30,120.00

6,6 1 m3 Galian tanah lumpur 1 m


6,6,2 Tenaga
Pekerja 1.2000 OH X Rp 29,000.00 = Rp 34,800.00
Tukang Gali 0.0000 OH X Rp 32,500.00 = Rp 0.00
Kepala Tukang 0.0000 OH X Rp 35,000.00 = Rp 0.00
Mandor 0.0450 OH X Rp 35,000.00 = Rp 1,575.00
Jumlah = Rp 36,375.00

6,9 1 m3 Urugan tanah kembali bekas galian


6.9.1 Tenaga
Pekerja 0.2500 OH X Rp 29,000.00 = Rp 7,250.00
Tukang Gali 0.0000 OH X Rp 32,500.00 = Rp 0.00
Kepala Tukang 0.0000 OH X Rp 35,000.00 = Rp 0.00
Mandor 0.0150 OH X Rp 35,000.00 = Rp 525.00
Jumlah = Rp 7,775.00

6,11 1 m3 Urugan tanah didatangkan


6.11.1 Bahan
Tanah biasa 1.2000 m3 X Rp 30,000.00 = Rp 36,000.00
Stamper 0.5000 jam X Rp 15,000.00 = Rp 7,500.00
Jumlah I = Rp 43,500.00
6.11.2 Tenaga
Pekerja 0.5000 OH X Rp 29,000.00 = Rp 14,500.00
Tukang batu 0.0000 OH X Rp 32,500.00 = Rp 0.00
Kepala Tukang 0.0000 OH X Rp 35,000.00 = Rp 0.00
Mandor 0.0150 OH X Rp 35,000.00 = Rp 525.00
Jumlah I = Rp 15,025.00
Jumlah I + II Rp 58,525.00

6,11 1 m3 Urugan pasir urug


6.11.1 Bahan
Pasir urug 1.2000 m3 X Rp 50,000.00 = Rp 60,000.00
Jumlah I = Rp 60,000.00
6.11.2 Tenaga
Pekerja 0.3000 OH X Rp 29,000.00 = Rp 8,700.00
Tukang batu 0.0000 OH X Rp 32,500.00 = Rp 0.00
Kepala Tukang 0.0000 OH X Rp 35,000.00 = Rp 0.00
Mandor 0.0100 OH X Rp 35,000.00 = Rp 350.00
Jumlah I = Rp 9,050.00
Jumlah I + II Rp 69,050.00

6,15 1 m3 Urugan Sirtu


6.15.1 Bahan
Pasir sirtu 1.2000 m3 X Rp 60,000.00 = Rp 72,000.00
Jumlah I = Rp 72,000.00
6.15.2 Tenaga
Pekerja 0.2500 OH X Rp 29,000.00 = Rp 7,250.00
Tukang batu 0.0000 OH X Rp 32,500.00 = Rp 0.00
Kepala Tukang 0.0000 OH X Rp 35,000.00 = Rp 0.00
Mandor 0.0250 OH X Rp 35,000.00 = Rp 875.00
Jumlah I = Rp 8,125.00
Jumlah I + II Rp 80,125.00

6,9 1 m3 Pasang batu kosong


6,9,1 Bahan
Batu belah 15/20 1.2000 m3 X Rp 85,000.00 = Rp 102,000.00
Pasir Urug 0.3000 m3 X Rp 50,000.00 = Rp 15,000.00
Jumlah I = Rp 117,000.00
6,9,2 Tenaga
Pekerja 0.7800 OH X Rp 29,000.00 = Rp 22,620.00
Tukang batu 0.3900 OH X Rp 32,500.00 = Rp 12,675.00
Kepala Tukang 0.0390 OH X Rp 35,000.00 = Rp 1,365.00
Mandor 0.0390 OH X Rp 35,000.00 = Rp 1,365.00
Jumlah I = Rp 38,025.00
Jumlah I + II Rp 155,025.00

6,2 1 m3 Pasang pondasi batu kali 1 pc : 4 psr


6,2,1 Bahan
Batu belah 1.2000 m3 X Rp 85,000.00 = Rp 102,000.00
Semen Portland 163.0000 kg X Rp 1,200.00 = Rp 195,600.00
Pasir pasang 0.5200 m3 X Rp 95,000.00 = Rp 49,400.00
Jumlah I = Rp 347,000.00
6,2,1 Tenaga
Pekerja 1.5000 OH X Rp 29,000.00 = Rp 43,500.00
Tukang batu 0.6000 OH X Rp 32,500.00 = Rp 19,500.00
Kepala Tukang 0.0600 OH X Rp 35,000.00 = Rp 2,100.00
Mandor 0.0750 OH X Rp 35,000.00 = Rp 2,625.00
Jumlah I = Rp 67,725.00
Jumlah I + II Rp 414,725.00

6,8 1 m3 Pasang Rolagg batu bata 1 : 3


6,8,1 Bahan
Batu bata 5 x 11 x 22 70.0000 bh X Rp 400.00 = Rp 28,000.00
Semen Portland 14.3700 kg X Rp 1,200.00 = Rp 17,244.00
Pasir pasang 0.0450 m3 X Rp 95,000.00 = Rp 4,275.00
Jumlah I = Rp 49,519.00
6,8,2 Tenaga
Pekerja 0.3200 OH X Rp 29,000.00 = Rp 9,280.00
Tukang batu 0.1000 OH X Rp 32,500.00 = Rp 3,250.00
Kepala Tukang 0.0100 OH X Rp 35,000.00 = Rp 350.00
Mandor 0.0150 OH X Rp 35,000.00 = Rp 525.00
Jumlah I = Rp 13,405.00
1 m2 Pasang batu bata 1 : 3 Jumlah I + II Rp 62,924.00

1 m3 Pasang batu bata 1 : 3 566,316.00

6,10 1 m3 Pasang batu bata 1 : 5


6,10,1 Bahan
Batu bata 5 x 11 x 22 70.0000 bh X Rp 400.00 = Rp 28,000.00
Semen Portland 9.6800 kg X Rp 1,200.00 = Rp 11,616.00
Pasir pasang 0.0450 m3 X Rp 95,000.00 = Rp 4,275.00
Jumlah I = Rp 43,891.00

6,10,2 Tenaga
Pekerja 0.3000 OH X Rp 29,000.00 = Rp 8,700.00
Tukang batu 0.1000 OH X Rp 32,500.00 = Rp 3,250.00
Kepala Tukang 0.0100 OH X Rp 35,000.00 = Rp 350.00
Mandor 0.0150 OH X Rp 35,000.00 = Rp 525.00
Jumlah I = Rp 12,825.00
1 m2 Pasang batu bata 1 : 5 Jumlah I + II Rp 56,716.00

1 m3 Pasang batu bata 1 : 5 510,444.00

IV.10 1 m2 Pasang batu tela 1pc : 5 kpr : 10 psr


IV.10.1 Bahan
Batu bata 5 x 11 x 22 70.0000 bh X Rp 400.00 = Rp 28,000.00
Semen Portland 8.3700 kg X Rp 1,200.00 = Rp 10,044.00
Kapur 0.0015 m3 X Rp 350,000.00 = Rp 525.00
Pasir pasang 0.0030 m3 X Rp 95,000.00 = Rp 285.00
Jumlah I = Rp 38,854.00
IV.10.2 Tenaga
Pekerja 0.3200 OH X Rp 29,000.00 = Rp 9,280.00
Tukang batu 0.1000 OH X Rp 32,500.00 = Rp 3,250.00
Kepala Tukang 0.0100 OH X Rp 35,000.00 = Rp 350.00
Mandor 0.0150 OH X Rp 35,000.00 = Rp 525.00
Jumlah I = Rp 13,405.00
1 m2 Pasang batu bata 1 : 5 : 10 Jumlah I + II Rp 52,259.00

1 m3 Pasang batu bata 1 : 5 : 10 470,331.00

6,8 1 m2 Pasang batu bata 1 : 3


6,8,1 Bahan
Batu tela 8 x 10 x 22 70.0000 bh X Rp 400.00 = Rp 28,000.00
Semen Portland 14.3700 kg X Rp 1,200.00 = Rp 17,244.00
Pasir pasang 0.0450 m3 X Rp 95,000.00 = Rp 4,275.00
Jumlah I = Rp 49,519.00
6,8,2 Tenaga
Pekerja 0.3200 OH X Rp 29,000.00 = Rp 9,280.00
Tukang batu 0.1000 OH X Rp 32,500.00 = Rp 3,250.00
Kepala Tukang 0.0100 OH X Rp 35,000.00 = Rp 350.00
Mandor 0.0150 OH X Rp 35,000.00 = Rp 525.00
Jumlah I = Rp 13,405.00
Jumlah I + II Rp 62,924.00

6,3 1 m2 Plesteran 1 : 3 tebal 15 mm


6,3,1 Bahan
Semen Portland 7.7760 kg X Rp 1,200.00 = Rp 9,331.20
Pasir pasang 0.0230 m3 X Rp 95,000.00 = Rp 2,185.00
Jumlah I = Rp 11,516.20
6,3,2 Tenaga
Pekerja 0.2000 OH X Rp 29,000.00 = Rp 5,800.00
Tukang batu 0.1500 OH X Rp 32,500.00 = Rp 4,875.00
Kepala Tukang 0.0150 OH X Rp 35,000.00 = Rp 525.00
Mandor 0.0100 OH X Rp 35,000.00 = Rp 350.00
Jumlah I = Rp 11,550.00
Jumlah I + II Rp 23,066.20

V.30 1 m2 Plesteran beton1 : 3 tebal 15 mm


V.30.1 Bahan
Semen Portland 7.0700 kg X Rp 1,200.00 = Rp 8,484.00
Pasir pasang 0.0210 m3 X Rp 95,000.00 = Rp 1,995.00
Jumlah I = Rp 10,479.00
V.30.2 Tenaga
Pekerja 0.2600 OH X Rp 29,000.00 = Rp 7,540.00
Tukang batu 0.2000 OH X Rp 32,500.00 = Rp 6,500.00
Kepala Tukang 0.0200 OH X Rp 35,000.00 = Rp 700.00
Mandor 0.0130 OH X Rp 35,000.00 = Rp 455.00
Jumlah I = Rp 15,195.00
Jumlah I + II Rp 25,674.00

6,5 1 m2 Plesteran 1 : 5 tebal 15 mm


6,5,1 Bahan
Semen Portland 5.1840 kg X Rp 1,200.00 = Rp 6,220.80
Pasir pasang 0.0260 m3 X Rp 95,000.00 = Rp 2,470.00
Jumlah I = Rp 8,690.80
6,5,2 Tenaga
Pekerja 0.2000 OH X Rp 29,000.00 = Rp 5,800.00
Tukang batu 0.1500 OH X Rp 32,500.00 = Rp 4,875.00
Kepala Tukang 0.0150 OH X Rp 35,000.00 = Rp 525.00
Mandor 0.0100 OH X Rp 35,000.00 = Rp 350.00
Jumlah I = Rp 11,550.00
Jumlah I + II Rp 20,240.80
V.22 1 m2 Plesteran 1 : 5 tebal 25 mm
V.22.1 Bahan
Semen Portland 7.9400 kg X Rp 1,200.00 = Rp 9,528.00
Pasir pasang 0.0390 m3 X Rp 95,000.00 = Rp 3,705.00
Jumlah I = Rp 13,233.00
V.22.2 Tenaga
Pekerja 0.3000 OH X Rp 29,000.00 = Rp 8,700.00
Tukang batu 0.2000 OH X Rp 32,500.00 = Rp 6,500.00
Kepala Tukang 0.0200 OH X Rp 35,000.00 = Rp 700.00
Mandor 0.0130 OH X Rp 35,000.00 = Rp 455.00
Jumlah I = Rp 16,355.00
Jumlah I + II Rp 29,588.00

1 m2 spesi tebal 30 mm
Bahan
Semen Portland 14.1500 kg X Rp 1,200.00 = Rp 16,980.00
Pasir pasang 0.0390 m3 X Rp 95,000.00 = Rp 3,705.00
Jumlah I = Rp 20,685.00
Tenaga
Pekerja 0.3000 OH X Rp 29,000.00 = Rp 8,700.00
Tukang batu 0.2000 OH X Rp 32,500.00 = Rp 6,500.00
Kepala Tukang 0.0200 OH X Rp 35,000.00 = Rp 700.00
Mandor 0.0130 OH X Rp 35,000.00 = Rp 455.00
Jumlah I = Rp 16,355.00
1 m2 Jumlah I + II Rp 37,040.00

1 m3 1,234,666.67
6,20 1 m1 Plesteran Skoning 1 : 2/Ban - banan
6,20,1 Bahan
Semen Portland 0.5000 kg X Rp 1,200.00 = Rp 600.00
Pasir pasang (muntilan) 0.0130 m3 X Rp 95,000.00 = Rp 1,235.00
Jumlah I = Rp 1,835.00
6,20,2 Tenaga
Pekerja 0.0570 OH X Rp 29,000.00 = Rp 1,653.00
Tukang batu 0.3800 OH X Rp 32,500.00 = Rp 12,350.00
Kepala Tukang 0.0380 OH X Rp 35,000.00 = Rp 1,330.00
Mandor 0.0300 OH X Rp 35,000.00 = Rp 1,050.00
Jumlah I = Rp 16,383.00
Jumlah I + II Rp 18,218.00

1 m1 Skonengan sudut 1 : 2
Bahan
Semen Portland 1.4240 kg X Rp 1,200.00 = Rp 1,708.80
Pasir pasang (muntilan) 0.0023 m3 X Rp 95,000.00 = Rp 216.60
Jumlah I = Rp 1,925.40
Tenaga
Pekerja 0.0800 OH X Rp 29,000.00 = Rp 2,320.00
Tukang batu 0.0300 OH X Rp 32,500.00 = Rp 975.00
Kepala Tukang 0.0020 OH X Rp 35,000.00 = Rp 70.00
Mandor 0.0020 OH X Rp 35,000.00 = Rp 70.00
Jumlah I = Rp 3,435.00
Jumlah I + II Rp 5,360.40

6,57 1 m2 Pasang dinding batu candi


6,57,1 Bahan
Batu candi 1.1000 m2 X Rp 90,000.00 = Rp 99,000.00
Semen Portland 11.7500 kg X Rp 1,200.00 = Rp 14,100.00
Pasir pasang 0.0350 m3 X Rp 95,000.00 = Rp 3,325.00
Jumlah I = Rp 116,425.00
6,57,2 Tenaga
Pekerja 0.6200 OH X Rp 29,000.00 = Rp 17,980.00
Tukang batu 0.3500 OH X Rp 32,500.00 = Rp 11,375.00
Kepala Tukang 0.0350 OH X Rp 35,000.00 = Rp 1,225.00
Mandor 0.0300 OH X Rp 35,000.00 = Rp 1,050.00
Jumlah I = Rp 31,630.00
Jumlah I + II Rp 148,055.00

6,57 1 m2 Pasang dinding koral sikat


6,57,1 Bahan
Batu koral 1.0500 m2 X Rp 110,000.00 = Rp 115,500.00
Semen Portland 11.7500 kg X Rp 1,200.00 = Rp 14,100.00
Pasir pasang 0.0350 m3 X Rp 95,000.00 = Rp 3,325.00
Jumlah I = Rp 132,925.00
6,57,2 Tenaga
Pekerja 0.6200 OH X Rp 29,000.00 = Rp 17,980.00
Tukang batu 0.3500 OH X Rp 32,500.00 = Rp 11,375.00
Kepala Tukang 0.0350 OH X Rp 35,000.00 = Rp 1,225.00
Mandor 0.0300 OH X Rp 35,000.00 = Rp 1,050.00
Jumlah I = Rp 31,630.00
Jumlah I + II Rp 164,555.00
PEKERJAAN BETON LT I

VII.4 1 m3 Rabat beton / Lantai kerja K 100


VII.4.1 Bahan
Semen Portland 230.0000 kg X Rp 1,200.00 = Rp 276,000.00
0.64 Pasir beton 893.0000 kg X Rp 137.28 = Rp 122,593.93
0.76 Batu pecah 2 / 3 1,027.0000 kg X Rp 105.87 = Rp 108,729.55
Air 200.0000 ltr X Rp 100.00 = Rp 20,000.00
Jumlah I = Rp 527,323.48
VII.4.2 Tenaga
Pekerja 1.2000 OH X Rp 29,000.00 = Rp 34,800.00
Tukang batu 0.2000 OH X Rp 32,500.00 = Rp 6,500.00
Kepala Tukang 0.0200 OH X Rp 35,000.00 = Rp 700.00
Mandor 0.0060 OH X Rp 35,000.00 = Rp 210.00
Jumlah I = Rp 42,210.00
Jumlah I + II Rp 569,533.48

VII.1 1 m3 beton K 225


VII.1.1 Bahan
Semen Portland 371.0000 kg X Rp 1,200.00 = Rp 445,200.00
0.49 Pasir beton 692.0000 kg X Rp 137.28 = Rp 95,000.00
0.77 Batu pecah 2 / 3 1,039.0000 kg X Rp 105.87 = Rp 110,000.00
Air 215.0000 ltr X Rp 100.00 = Rp 21,500.00
Jumlah I = Rp 650,200.00
VII.1.2 Tenaga
Pekerja 1.6500 OH X Rp 29,000.00 = Rp 47,850.00
Tukang batu 0.2500 OH X Rp 32,500.00 = Rp 8,125.00
Kepala Tukang 0.0250 OH X Rp 35,000.00 = Rp 875.00
Mandor 0.0800 OH X Rp 35,000.00 = Rp 2,800.00
Jumlah I = Rp 59,650.00
Jumlah I + II Rp 709,850.00

VII.25 10 kg pembesian besi polos


VII.25.1 Bahan
Besi beton polos 10.5000 kg X Rp 8,000.00 = Rp 84,000.00
Kawat beton 0.1500 Kg X Rp 10,000.00 = Rp 1,500.00
Jumlah I = Rp 85,500.00
VII.25.2 Tenaga
Pekerja 0.0700 OH X Rp 29,000.00 = Rp 2,030.00
Tukang besi 0.0700 OH X Rp 32,500.00 = Rp 2,275.00
Kepala Tukang 0.0070 OH X Rp 35,000.00 = Rp 245.00
Mandor 0.0040 OH X Rp 35,000.00 = Rp 140.00
Jumlah I = Rp 4,690.00
Jumlah I + II Rp 90,190.00
1 kg pembesian besi polos 9,019.00

VII.25 10 kg pembesian besi Ulir


VII.25.1 Bahan
Besi beton ulir 10.5000 kg X Rp 8,100.00 = Rp 85,050.00
Kawat beton 0.1500 Kg X Rp 10,000.00 = Rp 1,500.00
Jumlah I = Rp 86,550.00
VII.25.2 Tenaga
Pekerja 0.0700 OH X Rp 29,000.00 = Rp 2,030.00
Tukang besi 0.0700 OH X Rp 32,500.00 = Rp 2,275.00
Kepala Tukang 0.0070 OH X Rp 35,000.00 = Rp 245.00
Mandor 0.0040 OH X Rp 35,000.00 = Rp 140.00
Jumlah I = Rp 4,690.00
Jumlah I + II Rp 91,240.00
1 kg pembesian besi ulir 9,124.00

VII.28 1 m2 bekesting untuk pondasi


VII.28.1 Bahan
Kayu bekesting 0.0400 m3 X Rp 750,000.00 = Rp 30,000.00
Paku 0.3000 kg X Rp 12,000.00 = Rp 3,600.00
Minyak bekesting 0.1000 lt X Rp 20,000.00 = Rp 2,000.00
Jumlah I = Rp 35,600.00
VII.28.2 Tenaga
Pekerja 0.5200 OH X Rp 29,000.00 = Rp 15,080.00
Tukang kayu 0.2600 OH X Rp 32,500.00 = Rp 8,450.00
Kepala Tukang 0.0260 OH X Rp 35,000.00 = Rp 910.00
Mandor 0.0260 OH X Rp 35,000.00 = Rp 910.00
Jumlah I = Rp 25,350.00
Jumlah I + II Rp 60,950.00

VII.29 1 m2 bekesting untuk Sloof


VII.29.1 Bahan
Kayu bekesting 0.0450 m3 X Rp 750,000.00 = Rp 33,750.00
Paku 0.3000 kg X Rp 12,000.00 = Rp 3,600.00
Minyak bekesting 0.1000 lt X Rp 20,000.00 = Rp 2,000.00
Jumlah I = Rp 39,350.00
VII.29.2 Tenaga
Pekerja 0.5200 OH X Rp 29,000.00 = Rp 15,080.00
Tukang kayu 0.2600 OH X Rp 32,500.00 = Rp 8,450.00
Kepala Tukang 0.0260 OH X Rp 35,000.00 = Rp 910.00
Mandor 0.0260 OH X Rp 35,000.00 = Rp 910.00
Jumlah I = Rp 25,350.00
Jumlah I + II Rp 64,700.00

VII.30 1 m2 bekesting untuk kolom


VII.30.1 Bahan
Kayu bekesting 0.0400 m3 X Rp 750,000.00 = Rp 30,000.00
Paku 0.4000 kg X Rp 12,000.00 = Rp 4,800.00
Minyak bekesting 0.2000 lt X Rp 20,000.00 = Rp 4,000.00
Kayu kls 2 0.0150 m3 X Rp 2,000,000.00 = Rp 30,000.00
Pliwood 9 mm 0.3500 lbr X Rp 110,000.00 = Rp 38,500.00
Dolken Kayu 2.0000 btg X Rp 9,000.00 = Rp 18,000.00
Jumlah I = Rp 125,300.00
VII.30.2 Tenaga
Pekerja 0.6600 OH X Rp 29,000.00 = Rp 19,140.00
Tukang kayu 0.3300 OH X Rp 32,500.00 = Rp 10,725.00
Kepala Tukang 0.0330 OH X Rp 35,000.00 = Rp 1,155.00
Mandor 0.0330 OH X Rp 35,000.00 = Rp 1,155.00
Jumlah I = Rp 32,175.00
Jumlah I + II Rp 157,475.00

VII.30 1 m2 bekesting untuk beton praktis


VII.30.1 Bahan
Kayu bekesting 0.0400 m3 X Rp 750,000.00 = Rp 30,000.00
Paku 0.1333 kg X Rp 12,000.00 = Rp 1,600.00
Minyak bekesting 0.0667 lt X Rp 20,000.00 = Rp 1,333.33
Kayu kls 2 0.0050 m3 X Rp 2,000,000.00 = Rp 10,000.00
Jumlah I = Rp 42,933.33
VII.30.2 Tenaga
Pekerja 0.1000 OH X Rp 29,000.00 = Rp 2,900.00
Tukang kayu 0.1100 OH X Rp 32,500.00 = Rp 3,575.00
Kepala Tukang 0.0110 OH X Rp 35,000.00 = Rp 385.00
Mandor 0.0020 OH X Rp 35,000.00 = Rp 70.00
Jumlah I = Rp 6,930.00
Jumlah I + II Rp 49,863.33

VII.31 1 m2 bekesting untuk balok


VII.31.1 Bahan
Kayu bekesting 0.0400 m3 X Rp 750,000.00 = Rp 30,000.00
Paku 0.4000 kg X Rp 12,000.00 = Rp 4,800.00
Minyak bekesting 0.2000 lt X Rp 20,000.00 = Rp 4,000.00
Kayu kls 2 0.0180 m3 X Rp 2,000,000.00 = Rp 36,000.00
Pliwood 9 mm 0.3500 lbr X Rp 110,000.00 = Rp 38,500.00
Dolken Kayu 2.0000 btg X Rp 9,000.00 = Rp 18,000.00
Jumlah I = Rp 131,300.00

VII.31.2 Tenaga
Pekerja 0.6600 OH X Rp 29,000.00 = Rp 19,140.00
Tukang kayu 0.3300 OH X Rp 32,500.00 = Rp 10,725.00
Kepala Tukang 0.0330 OH X Rp 35,000.00 = Rp 1,155.00
Mandor 0.0330 OH X Rp 35,000.00 = Rp 1,155.00
Jumlah I = Rp 32,175.00
Jumlah I + II Rp 163,475.00

VII.31 1 m2 bekesting untuk tangga


VII.31.1 Bahan
Kayu bekesting 0.0300 m3 X Rp 750,000.00 = Rp 22,500.00
Paku 0.4000 kg X Rp 12,000.00 = Rp 4,800.00
Minyak bekesting 0.1500 lt X Rp 20,000.00 = Rp 3,000.00
Kayu kls 2 0.0150 m3 X Rp 2,000,000.00 = Rp 30,000.00
Pliwood 9 mm 0.3500 lbr X Rp 110,000.00 = Rp 38,500.00
Dolken Kayu 2.0000 btg X Rp 9,000.00 = Rp 18,000.00
Jumlah I = Rp 116,800.00
VII.31.2 Tenaga
Pekerja 0.6600 OH X Rp 29,000.00 = Rp 19,140.00
Tukang kayu 0.3300 OH X Rp 32,500.00 = Rp 10,725.00
Kepala Tukang 0.0330 OH X Rp 35,000.00 = Rp 1,155.00
Mandor 0.0330 OH X Rp 35,000.00 = Rp 1,155.00
Jumlah I = Rp 32,175.00
Jumlah I + II Rp 148,975.00

1 m2 bekesting untuk plat atap


Bahan
Kayu bekesting 0.0300 m3 X Rp 750,000.00 = Rp 22,500.00
Paku 0.4000 kg X Rp 12,000.00 = Rp 4,800.00
Minyak bekesting 0.2000 lt X Rp 20,000.00 = Rp 4,000.00
Kayu kls 2 0.0100 m3 X Rp 2,000,000.00 = Rp 20,000.00
Pliwood 9 mm 0.3500 lbr X Rp 110,000.00 = Rp 38,500.00
Dolken Kayu 3.0000 btg X Rp 9,000.00 = Rp 27,000.00
spacer/penjaga jarak 4.0000 btg X Rp 5,000.00 = Rp 20,000.00
Jumlah I = Rp 116,800.00
Tenaga
Pekerja 0.6600 OH X Rp 29,000.00 = Rp 19,140.00
Tukang kayu 0.3300 OH X Rp 32,500.00 = Rp 10,725.00
Kepala Tukang 0.0330 OH X Rp 35,000.00 = Rp 1,155.00
Mandor 0.0330 OH X Rp 35,000.00 = Rp 1,155.00
Jumlah I = Rp 32,175.00
Jumlah I + II Rp 148,975.00

LT 1

1 m3 membuat pondasi Beton Bertulang (125 kg Besi + Bekesting)


Bahan
Beton Bertulang K 250 1.0000 m3 X Rp 709,850.00 = Rp 709,850.00
Besi beton polos 0.0000 kg X Rp 9,019.00 = Rp 0.00
Besi beton ulir 100.0000 kg X Rp 9,124.00 = Rp 912,400.00
Bekesting 2.3000 m2 X Rp 64,700.00 = Rp 148,810.00
Jumlah I = Rp 1,771,060.00
Jumlah I + II Rp 1,771,060.00

1 m3 membuat sloof S1 20/30 Beton Bertulang (194 kg Besi + Bekesting)


Bahan
Beton Bertulang K 250 1.0000 m3 X Rp 709,850.00 = Rp 709,850.00
Besi beton polos kg X Rp 9,019.00 = Rp 0.00
Besi beton ulir 100.0000 kg X Rp 9,124.00 = Rp 912,400.00
Bekesting 4.9980 m2 X Rp 64,700.00 = Rp 323,370.60
Jumlah I = Rp 1,945,620.60
Jumlah I + II Rp 1,945,620.60

1 m3 membuat sloof S2 20/30 Beton Bertulang (149 kg Besi + Bekesting)


Bahan
Beton Bertulang K 250 1.0000 m3 X Rp 709,850.00 = Rp 709,850.00
Besi beton polos 33.3068 kg X Rp 9,019.00 = Rp 300,393.58
Besi beton ulir 115.7200 kg X Rp 9,124.00 = Rp 1,055,829.28
Bekesting 9.9960 m2 X Rp 64,700.00 = Rp 646,741.20
Jumlah I = Rp 2,712,814.06
Jumlah I + II Rp 2,712,814.06

1 m3 membuat sloof Praktis Beton Bertulang (125 kg Besi + Bekesting)


Bahan
Beton Bertulang K 250 1.0000 m3 X Rp 709,850.00 = Rp 709,850.00
Besi beton polos 110.0000 kg X Rp 9,019.00 = Rp 992,090.00
Besi beton ulir 0.0000 kg X Rp 9,124.00 = Rp 0.00
Bekesting 9.9960 m2 X Rp 32,350.00 = Rp 323,370.60
Jumlah I = Rp 2,025,310.60
Jumlah I + II Rp 2,025,310.60

1 m3 membuat kolom K1 30/50 Beton Bertulang (165 kg Besi + Bekesting)


Bahan
Beton Bertulang K 250 1.0000 m3 X Rp 709,850.00 = Rp 709,850.00
Besi beton polos 100.0000 kg X Rp 9,019.00 = Rp 901,900.00
Besi beton ulir kg X Rp 9,124.00 = Rp 0.00
Bekesting 3.3330 m2 X Rp 157,475.00 = Rp 524,864.18
Jumlah I = Rp 2,136,614.18
Jumlah I + II Rp 2,136,614.18

1 m3 membuat kolom K2 30/50 Beton Bertulang (142 kg Besi + Bekesting)


Bahan
Beton Bertulang K 250 1.0000 m3 X Rp 709,850.00 = Rp 709,850.00
Besi beton polos 26.4096 kg X Rp 9,019.00 = Rp 238,188.18
Besi beton ulir 115.7200 kg X Rp 9,124.00 = Rp 1,055,829.28
Bekesting 9.9990 m2 X Rp 157,475.00 = Rp 1,574,592.53
Jumlah I = Rp 3,578,459.99
Jumlah I + II Rp 3,578,459.99

1 m3 membuat kolom K3 30/30 Beton Bertulang (187 kg Besi + Bekesting)


Bahan
Beton Bertulang K 250 1.0000 m3 X Rp 709,850.00 = Rp 709,850.00
Besi beton polos 33.0120 kg X Rp 9,019.00 = Rp 297,735.23
Besi beton ulir 154.2933 kg X Rp 9,124.00 = Rp 1,407,772.37
Bekesting 13.3332 m2 X Rp 157,475.00 = Rp 2,099,645.67
Jumlah I = Rp 4,515,003.27
Jumlah I + II Rp 4,515,003.27

1 m3 membuat kolom K4 30/30 Beton Bertulang (134 kg Besi + Bekesting)


Bahan
Beton Bertulang K 250 1.0000 m3 X Rp 709,850.00 = Rp 709,850.00
Besi beton polos 33.0120 kg X Rp 9,019.00 = Rp 297,735.23
Besi beton ulir 101.6889 kg X Rp 9,124.00 = Rp 927,809.42
Bekesting 13.3332 m2 X Rp 157,475.00 = Rp 2,099,645.67
Jumlah I = Rp 4,035,040.32
Jumlah I + II Rp 4,035,040.32

1 m3 membuat kolom Kolom praktis Beton Bertulang (125 kg Besi + Bekesting)


Bahan
Beton Bertulang K 250 1.0000 m3 X Rp 709,850.00 = Rp 709,850.00
Besi beton polos 100.0000 kg X Rp 9,019.00 = Rp 901,900.00
Besi beton ulir 0.0000 kg X Rp 9,124.00 = Rp 0.00
Bekesting 3.3333 m2 X Rp 78,737.50 = Rp 262,455.71
Jumlah I = Rp 1,874,205.71
Jumlah I + II Rp 1,874,205.71

1 m3 membuat Balok B1 25/50 Beton Bertulang (212 kg Besi + Bekesting)


Bahan
Beton Bertulang K 250 1.0000 m3 X Rp 709,850.00 = Rp 709,850.00
Besi beton polos 60.6360 kg X Rp 9,019.00 = Rp 546,876.08
Besi beton ulir 152.2048 kg X Rp 9,124.00 = Rp 1,388,716.60
Bekesting 10.0000 m2 X Rp 163,475.00 = Rp 1,634,750.00
Jumlah I = Rp 4,280,192.68
Jumlah I + II Rp 4,280,192.68

1 m3 membuat Balok B2 25/50 Beton Bertulang (315 kg Besi + Bekesting)


Bahan
Beton Bertulang K 250 1.0000 m3 X Rp 709,850.00 = Rp 709,850.00
Besi beton polos 104.1600 kg X Rp 9,019.00 = Rp 939,419.04
Besi beton ulir 211.1472 kg X Rp 9,124.00 = Rp 1,926,507.05
Bekesting 10.0000 m2 X Rp 163,475.00 = Rp 1,634,750.00
Jumlah I = Rp 5,210,526.09
Jumlah I + II Rp 5,210,526.09

1 m3 membuat Balok B3 25/50 Beton Bertulang (193 kg Besi + Bekesting)


Bahan
Beton Bertulang K 250 1.0000 m3 X Rp 709,850.00 = Rp 709,850.00
Besi beton polos 60.6360 kg X Rp 9,019.00 = Rp 546,876.08
Besi beton ulir 132.9328 kg X Rp 9,124.00 = Rp 1,212,878.87
Bekesting 10.0000 m2 X Rp 163,475.00 = Rp 1,634,750.00
Jumlah I = Rp 4,104,354.95
Jumlah I + II Rp 4,104,354.95

1 m3 membuat Balok B4 25/50 Beton Bertulang (174 kg Besi + Bekesting)


Bahan
Beton Bertulang K 250 1.0000 m3 X Rp 709,850.00 = Rp 709,850.00
Besi beton polos 60.6360 kg X Rp 9,019.00 = Rp 546,876.08
Besi beton ulir 113.3792 kg X Rp 9,124.00 = Rp 1,034,471.82
Bekesting 10.0000 m2 X Rp 163,475.00 = Rp 1,634,750.00
Jumlah I = Rp 3,925,947.90
Jumlah I + II Rp 3,925,947.90

1 m3 membuat Balok B5 20/50 Beton Bertulang (189 kg Besi + Bekesting)


Bahan
Beton Bertulang K 250 1.0000 m3 X Rp 709,850.00 = Rp 709,850.00
Besi beton polos 48.0443 kg X Rp 9,019.00 = Rp 433,311.09
Besi beton ulir 141.7240 kg X Rp 9,124.00 = Rp 1,293,089.78
Bekesting 12.0000 m2 X Rp 163,475.00 = Rp 1,961,700.00
Jumlah I = Rp 4,397,950.87
Jumlah I + II Rp 4,397,950.87

1 m3 membuat Balok B6 20/30 Beton Bertulang (179 kg Besi + Bekesting)


Bahan
Beton Bertulang K 250 1.0000 m3 X Rp 709,850.00 = Rp 709,850.00
Besi beton polos 64.0590 kg X Rp 9,019.00 = Rp 577,748.12
Besi beton ulir 115.7200 kg X Rp 9,124.00 = Rp 1,055,829.28
Bekesting 13.3360 m2 X Rp 163,475.00 = Rp 2,180,102.60
Jumlah I = Rp 4,523,530.00
Jumlah I + II Rp 4,523,530.00

1 m3 membuat Balok B6 20/30 Beton Bertulang (179 kg Besi + Bekesting)


Bahan
Beton Bertulang K 250 1.0000 m3 X Rp 709,850.00 = Rp 709,850.00
Besi beton polos 0.0000 kg X Rp 9,019.00 = Rp 0.00
Besi beton ulir 0.0000 kg X Rp 9,124.00 = Rp 0.00
Bekesting 13.3360 m2 X Rp 163,475.00 = Rp 2,180,102.60
Jumlah I = Rp 2,889,952.60
Jumlah I + II Rp 2,889,952.60

1 m3 membuat plat dak Beton Bertulang (85 kg Besi + Bekesting)


Bahan
Beton Bertulang K 250 1.0000 m3 X Rp 709,850.00 = Rp 709,850.00
Besi beton polos 75.0000 kg X Rp 9,019.00 = Rp 676,425.00
Besi beton ulir 0.0000 kg X Rp 9,124.00 = Rp 0.00
Bekesting 7.0000 m2 X Rp 81,737.50 = Rp 572,162.50
Jumlah I = Rp 1,958,437.50
Jumlah I + II Rp 1,958,437.50

LT 2

1 m3 membuat kolom K1 30/50 Beton Bertulang (165 kg Besi + Bekesting)


Bahan
Beton Bertulang K 250 1.0000 m3 X Rp 709,850.00 = Rp 709,850.00
Besi beton polos 100.0000 kg X Rp 9,019.00 = Rp 901,900.00
Besi beton ulir 0.0000 kg X Rp 9,124.00 = Rp 0.00
Bekesting 2 x Pakai 3.3330 m2 X Rp 78,737.50 = Rp 262,432.09
Jumlah I = Rp 1,874,182.09
Jumlah I + II Rp 1,874,182.09

1 m3 membuat kolom K2 30/50 Beton Bertulang (142 kg Besi + Bekesting)


Bahan
Beton Bertulang K 250 1.0000 m3 X Rp 709,850.00 = Rp 709,850.00
Besi beton polos 26.4096 kg X Rp 9,019.00 = Rp 238,188.18
Besi beton ulir 115.7200 kg X Rp 9,124.00 = Rp 1,055,829.28
Bekesting 2 x Pakai 9.9990 m2 X Rp 78,737.50 = Rp 787,296.26
Jumlah I = Rp 2,791,163.72
Jumlah I + II Rp 2,791,163.72

1 m3 membuat kolom K3 30/30 Beton Bertulang (187 kg Besi + Bekesting)


Bahan
Beton Bertulang K 250 1.0000 m3 X Rp 709,850.00 = Rp 709,850.00
Besi beton polos 33.0120 kg X Rp 9,019.00 = Rp 297,735.23
Besi beton ulir 154.2933 kg X Rp 9,124.00 = Rp 1,407,772.37
Bekesting 2 x Pakai 13.3332 m2 X Rp 78,737.50 = Rp 1,049,822.84
Jumlah I = Rp 3,465,180.44
Jumlah I + II Rp 3,465,180.44

1 m3 membuat kolom K4 30/30 Beton Bertulang (134 kg Besi + Bekesting)


Bahan
Beton Bertulang K 250 1.0000 m3 X Rp 709,850.00 = Rp 709,850.00
Besi beton polos 33.0120 kg X Rp 9,019.00 = Rp 297,735.23
Besi beton ulir 101.6889 kg X Rp 9,124.00 = Rp 927,809.42
Bekesting 2 x Pakai 13.3332 m2 X Rp 78,737.50 = Rp 1,049,822.84
Jumlah I = Rp 2,985,217.49
Jumlah I + II Rp 2,985,217.49

1 m3 membuat kolom K5 15/30 Beton Bertulang (169 kg Besi + Bekesting)


Bahan
Beton Bertulang K 250 1.0000 m3 X Rp 709,850.00 = Rp 709,850.00
Besi beton polos 169.5333 kg X Rp 9,019.00 = Rp 1,529,021.13
Besi beton ulir 0.0000 kg X Rp 9,124.00 = Rp 0.00
Bekesting 2 x Pakai 16.6667 m2 X Rp 78,737.50 = Rp 1,312,291.67
Jumlah I = Rp 3,551,162.80
Jumlah I + II Rp 3,551,162.80
22.2222
1 m3 membuat kolom K6 15/40 Beton Bertulang (169 kg Besi + Bekesting)
Bahan
Beton Bertulang K 250 1.0000 m3 X Rp 709,850.00 = Rp 709,850.00
Besi beton polos 0.0000 kg X Rp 9,019.00 = Rp 0.00
Besi beton ulir 193.6348 kg X Rp 9,124.00 = Rp 1,766,724.22
Bekesting 2 x Pakai 17.5000 m2 X Rp 78,737.50 = Rp 1,377,906.25
Jumlah I = Rp 3,854,480.47
Jumlah I + II Rp 3,854,480.47
16.6667
1 m3 membuat kolom Kolom praktis Beton Bertulang (125 kg Besi + Bekesting)
Bahan
Beton Bertulang K 250 1.0000 m3 X Rp 709,850.00 = Rp 709,850.00
Besi beton polos 100.0000 kg X Rp 9,019.00 = Rp 901,900.00
Besi beton ulir 0.0000 kg X Rp 9,124.00 = Rp 0.00
Bekesting 2 x Pakai 3.3333 m2 X Rp 39,368.75 = Rp 131,227.85
Jumlah I = Rp 1,742,977.85
Jumlah I + II Rp 1,742,977.85

1 m3 membuat Balok BA6 20/25 Beton Bertulang (212kg Besi + Bekesting)


Bahan
Beton Bertulang K 250 1.0000 m3 X Rp 709,850.00 = Rp 709,850.00
Besi beton polos 212.7600 kg X Rp 9,019.00 = Rp 1,918,882.44
Besi beton ulir 0.0000 kg X Rp 9,124.00 = Rp 0.00
Bekesting 2 X pakai 12.0000 m2 X Rp 81,737.50 = Rp 980,850.00
Jumlah I = Rp 3,609,582.44
Jumlah I + II Rp 3,609,582.44

1 m3 membuat Balok BR1 20/40 Beton Bertulang (226 kg Besi + Bekesting)


Bahan
Beton Bertulang K 250 1.0000 m3 X Rp 709,850.00 = Rp 709,850.00
Besi beton polos 110.0000 kg X Rp 9,019.00 = Rp 992,090.00
Besi beton ulir 0.0000 kg X Rp 9,124.00 = Rp 0.00
Bekesting 2 X pakai 5.0000 m2 X Rp 81,737.50 = Rp 408,687.50
Jumlah I = Rp 2,110,627.50
Jumlah I + II Rp 2,110,627.50

1 m3 membuat Balok Bordes 20/40 Beton Bertulang (199 kg Besi + Bekesting)


Bahan
Beton Bertulang K 250 1.0000 m3 X Rp 709,850.00 = Rp 709,850.00
Besi beton polos 199.6731 kg X Rp 9,019.00 = Rp 1,800,851.69
Besi beton ulir 0.0000 kg X Rp 9,124.00 = Rp 0.00
Bekesting 2 X pakai 10.0000 m2 X Rp 81,737.50 = Rp 817,375.00
Jumlah I = Rp 3,328,076.69
Jumlah I + II Rp 3,328,076.69

1 m3 membuat Balok BA1 20/30 Beton Bertulang (238 kg Besi + Bekesting)


Bahan
Beton Bertulang K 250 1.0000 m3 X Rp 709,850.00 = Rp 709,850.00
Besi beton polos 238.4750 kg X Rp 9,019.00 = Rp 2,150,806.03
Besi beton ulir kg X Rp 9,124.00 = Rp 0.00
Bekesting 2 X pakai 13.3360 m2 X Rp 81,737.50 = Rp 1,090,051.30
Jumlah I = Rp 3,950,707.33
Jumlah I + II Rp 3,950,707.33

1 m3 membuat Balok BA2 20/40 Beton Bertulang (202 kg Besi + Bekesting)


Bahan
Beton Bertulang K 250 1.0000 m3 X Rp 709,850.00 = Rp 709,850.00
Besi beton polos 130.0000 kg X Rp 9,019.00 = Rp 1,172,470.00
Besi beton ulir kg X Rp 9,124.00 = Rp 0.00
Bekesting 2 X pakai 6.0000 m2 X Rp 81,737.50 = Rp 490,425.00
Jumlah I = Rp 2,372,745.00
Jumlah I + II Rp 2,372,745.00

1 m3 membuat Balok BA3 20/40 Beton Bertulang (226 kg Besi + Bekesting)


Bahan
Beton Bertulang K 250 1.0000 m3 X Rp 709,850.00 = Rp 709,850.00
Besi beton polos 226.2831 kg X Rp 9,019.00 = Rp 2,040,847.28
Besi beton ulir 0.0000 kg X Rp 9,124.00 = Rp 0.00
Bekesting 2 X pakai 6.0000 m2 X Rp 81,737.50 = Rp 490,425.00
Jumlah I = Rp 3,241,122.28
Jumlah I + II Rp 3,241,122.28

1 m3 membuat Balok BA4 20/40 Beton Bertulang (218 kg Besi + Bekesting)


Bahan
Beton Bertulang K 250 1.0000 m3 X Rp 709,850.00 = Rp 709,850.00
Besi beton polos 218.6561 kg X Rp 9,019.00 = Rp 1,972,058.91
Besi beton ulir 0.0000 kg X Rp 9,124.00 = Rp 0.00
Bekesting 2 X pakai 6.0000 m2 X Rp 81,737.50 = Rp 490,425.00
Jumlah I = Rp 3,172,333.91
Jumlah I + II Rp 3,172,333.91

6,35 1 m2 Pasang Keramik lantai 60 / 60 warna


6,35,1 Bahan
keramik 60 / 60 warna 3.0000 bh X Rp 28,800.00 = Rp 86,400.00
Semen Portland 8.1900 kg X Rp 1,200.00 = Rp 9,828.00
Pasir pasang 0.0450 m3 X Rp 95,000.00 = Rp 4,275.00
Semen warna 1.5000 kg X Rp 5,000.00 = Rp 7,500.00
Jumlah I = Rp 108,003.00
6,35,2 Tenaga
Pekerja 0.6200 OH X Rp 29,000.00 = Rp 17,980.00
Tukang batu 0.3500 OH X Rp 32,500.00 = Rp 11,375.00
Kepala Tukang 0.0350 OH X Rp 35,000.00 = Rp 1,225.00
Mandor 0.0300 OH X Rp 35,000.00 = Rp 1,050.00
Jumlah I = Rp 31,630.00
Jumlah I + II Rp 139,633.00

1 m2 Pasang Granito
Bahan
granito 40 x 40 6.6300 bh X Rp 37,707.39 = Rp 250,000.00
Semen Portland 9.8000 kg X Rp 1,200.00 = Rp 11,760.00
Pasir pasang 0.0450 m3 X Rp 95,000.00 = Rp 4,275.00
Semen warna 1.3000 kg X Rp 5,000.00 = Rp 6,500.00
Jumlah I = Rp 272,535.00
Tenaga
Pekerja 0.2500 OH X Rp 29,000.00 = Rp 7,250.00
Tukang batu 0.1200 OH X Rp 32,500.00 = Rp 3,900.00
Kepala Tukang 0.0120 OH X Rp 35,000.00 = Rp 420.00
Mandor 0.0130 OH X Rp 35,000.00 = Rp 455.00
Jumlah I = Rp 12,025.00
Jumlah I + II Rp 284,560.00

1 m2 Pasang Keramik lantai 40 / 40 warna


Bahan
keramik 40 / 40 warna 6.6300 bh X Rp 6,800.00 = Rp 45,084.00
Semen Portland 8.1900 kg X Rp 1,200.00 = Rp 9,828.00
Pasir pasang 0.0420 m3 X Rp 95,000.00 = Rp 3,990.00
Semen warna 1.5000 kg X Rp 5,000.00 = Rp 7,500.00
Jumlah I = Rp 66,402.00
Tenaga
Pekerja 0.6200 OH X Rp 29,000.00 = Rp 17,980.00
Tukang batu 0.3500 OH X Rp 32,500.00 = Rp 11,375.00
Kepala Tukang 0.0350 OH X Rp 35,000.00 = Rp 1,225.00
Mandor 0.0300 OH X Rp 35,000.00 = Rp 1,050.00
Jumlah I = Rp 31,630.00
Jumlah I + II Rp 98,032.00

6,35 1 m2 Pasang Keramik lantai 30 / 30 Tekstur


6,35,1 Bahan
keramik 30 / 30 warna 11.8700 bh X Rp 3,690.00 = Rp 43,800.30
Semen Portland 10.0000 kg X Rp 1,200.00 = Rp 12,000.00
Pasir pasang 0.0450 m3 X Rp 95,000.00 = Rp 4,275.00
Semen warna 1.5000 kg X Rp 5,000.00 = Rp 7,500.00
Jumlah I = Rp 67,575.30

6,35,2 Tenaga
Pekerja 0.6200 OH X Rp 29,000.00 = Rp 17,980.00
Tukang batu 0.3500 OH X Rp 32,500.00 = Rp 11,375.00
Kepala Tukang 0.0350 OH X Rp 35,000.00 = Rp 1,225.00
Mandor 0.0300 OH X Rp 35,000.00 = Rp 1,050.00
Jumlah I = Rp 31,630.00
Jumlah I + II Rp 99,205.30

6,35 1 m2 Pasang Keramik lantai 30 / 30 putih


6,35,1 Bahan
keramik 30 / 30 motif 11.8700 bh X Rp 3,690.00 = Rp 43,800.30
Semen Portland 10.0000 kg X Rp 1,200.00 = Rp 12,000.00
Pasir pasang 0.0450 m3 X Rp 95,000.00 = Rp 4,275.00
Semen warna 1.5000 kg X Rp 5,000.00 = Rp 7,500.00
Jumlah I = Rp 67,575.30
6,35,2 Tenaga
Pekerja 0.6200 OH X Rp 29,000.00 = Rp 17,980.00
Tukang batu 0.3500 OH X Rp 32,500.00 = Rp 11,375.00
Kepala Tukang 0.0350 OH X Rp 35,000.00 = Rp 1,225.00
Mandor 0.0300 OH X Rp 35,000.00 = Rp 1,050.00
Jumlah I = Rp 31,630.00
Jumlah I + II Rp 99,205.30

6,36 1 m2 Pasang Keramik lantai 20 / 20 tekstur


6,36,1 Bahan
keramik 20 / 20 tektur 25.0000 bh X Rp 1,560.00 = Rp 39,000.00
Semen Portland 11.3800 kg X Rp 1,200.00 = Rp 13,656.00
Pasir pasang 0.0420 m3 X Rp 95,000.00 = Rp 3,990.00
Semen warna 1.5000 kg X Rp 5,000.00 = Rp 7,500.00
Jumlah I = Rp 64,146.00

6,36,2 Tenaga
Pekerja 0.6200 OH X Rp 29,000.00 = Rp 17,980.00
Tukang batu 0.3500 OH X Rp 32,500.00 = Rp 11,375.00
Kepala Tukang 0.0350 OH X Rp 35,000.00 = Rp 1,225.00
Mandor 0.0300 OH X Rp 35,000.00 = Rp 1,050.00
Jumlah I = Rp 31,630.00
Jumlah I + II Rp 95,776.00

6,36 1 m2 Pasang Keramik lantai 20 / 20 putih


6,36,1 Bahan
keramik 20 / 20 25.0000 bh X Rp 1,560.00 = Rp 39,000.00
Semen Portland 11.3800 kg X Rp 1,200.00 = Rp 13,656.00
Pasir pasang 0.0420 m3 X Rp 95,000.00 = Rp 3,990.00
Semen warna 1.5000 kg X Rp 5,000.00 = Rp 7,500.00
Jumlah I = Rp 64,146.00

6,36,2 Tenaga
Pekerja 0.6200 OH X Rp 29,000.00 = Rp 17,980.00
Tukang batu 0.3500 OH X Rp 32,500.00 = Rp 11,375.00
Kepala Tukang 0.0350 OH X Rp 35,000.00 = Rp 1,225.00
Mandor 0.0300 OH X Rp 35,000.00 = Rp 1,050.00
Jumlah I = Rp 31,630.00
Jumlah I + II Rp 95,776.00
XIII.68 1 m2 Pasang Keramik dinding 20 / 25 Motif
XIII.68.1 Bahan
keramik 20 / 25 20.0000 bh X Rp 1,950.00 = Rp 39,000.00
Semen Portland 9.3000 kg X Rp 1,200.00 = Rp 11,160.00
Pasir pasang 0.0180 m3 X Rp 95,000.00 = Rp 1,710.00
Semen warna 1.5000 kg X Rp 5,000.00 = Rp 7,500.00
Jumlah I = Rp 59,370.00

XIII.68.2 Tenaga
Pekerja 0.6000 OH X Rp 29,000.00 = Rp 17,400.00
Tukang batu 0.1000 OH X Rp 32,500.00 = Rp 3,250.00
Kepala Tukang 0.0450 OH X Rp 35,000.00 = Rp 1,575.00
Mandor 0.0300 OH X Rp 35,000.00 = Rp 1,050.00
Jumlah I = Rp 23,275.00
Jumlah I + II Rp 82,645.00

XIII.68 1 m2 Pasang Keramik dinding 20 / 25 Warna


XIII.68.1 Bahan
keramik 20 / 25 20.0000 bh X Rp 1,950.00 = Rp 39,000.00
Semen Portland 9.3000 kg X Rp 1,200.00 = Rp 11,160.00
Pasir pasang 0.0180 m3 X Rp 95,000.00 = Rp 1,710.00
Semen warna 1.5000 kg X Rp 5,000.00 = Rp 7,500.00
Jumlah I = Rp 59,370.00
XIII.68.2 Tenaga
Pekerja 0.6000 OH X Rp 29,000.00 = Rp 17,400.00
Tukang batu 0.1000 OH X Rp 32,500.00 = Rp 3,250.00
Kepala Tukang 0.0450 OH X Rp 35,000.00 = Rp 1,575.00
Mandor 0.0300 OH X Rp 35,000.00 = Rp 1,050.00
Jumlah II = Rp 23,275.00
Jumlah I + II Rp 82,645.00

XIII.69 1 m2 Pasang Keramik dinding 20 / 33 Warna


XIII.69.1 Bahan
keramik 20 / 33 23.0000 bh X Rp 2,508.00 = Rp 57,684.00
Semen Portland 9.3000 kg X Rp 1,200.00 = Rp 11,160.00
Pasir pasang 0.0180 m3 X Rp 95,000.00 = Rp 1,710.00
Semen warna 1.5000 kg X Rp 5,000.00 = Rp 7,500.00
Jumlah I = Rp 78,054.00
XIII.69.2 Tenaga
Pekerja 0.6000 OH X Rp 29,000.00 = Rp 17,400.00
Tukang batu 0.1000 OH X Rp 32,500.00 = Rp 3,250.00
Kepala Tukang 0.0450 OH X Rp 35,000.00 = Rp 1,575.00
Mandor 0.0300 OH X Rp 35,000.00 = Rp 1,050.00
Jumlah II = Rp 23,275.00
Jumlah I + II Rp 101,329.00

6,39 1 m1 Pasang plin keramik 10 / 20


6,39,1 Bahan
keramik 10 / 20 5.3000 bh X Rp 5,500.00 = Rp 29,150.00
Semen Portland 1.1400 kg X Rp 1,200.00 = Rp 1,368.00
Pasir pasang 0.0030 m3 X Rp 95,000.00 = Rp 285.00
Semen warna 0.0250 kg X Rp 5,000.00 = Rp 125.00
Jumlah I = Rp 30,928.00
6,39,2 Tenaga
Pekerja 0.0900 OH X Rp 29,000.00 = Rp 2,610.00
Tukang batu 0.0900 OH X Rp 32,500.00 = Rp 2,925.00
Kepala Tukang 0.0090 OH X Rp 35,000.00 = Rp 315.00
Mandor 0.0050 OH X Rp 35,000.00 = Rp 175.00
Jumlah II = Rp 6,025.00
Jumlah I + II Rp 36,953.00
6,39 1 m1 Pasang border lis motif 10 / 20
6,39,1 Bahan
keramik artistik 10 / 20 5.3000 bh X Rp 15,000.00 = Rp 79,500.00
Semen Portland 1.1400 kg X Rp 1,200.00 = Rp 1,368.00
Pasir pasang 0.0030 m3 X Rp 95,000.00 = Rp 285.00
Semen warna 0.0250 kg X Rp 5,000.00 = Rp 125.00
Jumlah I = Rp 81,278.00
6,39,2 Tenaga
Pekerja 0.0900 OH X Rp 29,000.00 = Rp 2,610.00
Tukang batu 0.0900 OH X Rp 32,500.00 = Rp 2,925.00
Kepala Tukang 0.0090 OH X Rp 35,000.00 = Rp 315.00
Mandor 0.0050 OH X Rp 35,000.00 = Rp 175.00
Jumlah I = Rp 6,025.00
Jumlah I + II Rp 87,303.00

XIII.38 1 m1 Pasang plin keramik nosing Tile 7/10


XIII.38.1 Bahan
Nosing Tile 7/10 10.0000 bh X Rp 7,500.00 = Rp 75,000.00
Semen Portland 1.6500 kg X Rp 1,200.00 = Rp 1,980.00
Pasir pasang 0.0032 m3 X Rp 95,000.00 = Rp 304.00
Semen warna 0.1200 kg X Rp 5,000.00 = Rp 600.00
Jumlah I = Rp 77,884.00

XIII.38.2 Tenaga
Pekerja 0.0900 OH X Rp 29,000.00 = Rp 2,610.00
Tukang batu 0.0900 OH X Rp 32,500.00 = Rp 2,925.00
Kepala Tukang 0.0090 OH X Rp 35,000.00 = Rp 315.00
Mandor 0.0045 OH X Rp 35,000.00 = Rp 157.50
Jumlah I = Rp 6,007.50
Jumlah I + II Rp 83,891.50
4.0000
VI.31 1 m2 Pasang Usuk dan Reng kayu Bengkirai 0.011
VI.31.1 Bahan
Kayu Bengkirai usuk 5/7 0.0140 m3 X Rp 4,500,000.00 = Rp 63,000.00
Kayu Bengkirai reng 2/3 0.0030 m3 X Rp 4,500,000.00 = Rp 13,500.00
Paku 0.2500 kg X Rp 12,000.00 = Rp 3,000.00
Jumlah I = Rp 79,500.00
VI.31.2 Tenaga
Pekerja 0.1000 OH X Rp 29,000.00 = Rp 2,900.00
Tukang kayu 0.1000 OH X Rp 32,500.00 = Rp 3,250.00
Kepala Tukang 0.0100 OH X Rp 35,000.00 = Rp 350.00
Mandor 0.0050 OH X Rp 35,000.00 = Rp 175.00
Jumlah I = Rp 6,675.00
Jumlah I + II Rp 86,175.00

1 m2 Pasang Rangka Partisi aluminium 4" Brown


Bahan
Profil Aluminium 4 " Brown 5.2000 m1 X Rp 65,000.00 = Rp 338,000.00
Sekrup Fixer 9.0000 bh X Rp 250.00 = Rp 2,250.00
Sealent 0.1200 tube X Rp 25,000.00 = Rp 3,000.00
Jumlah I = Rp 343,250.00
Tenaga
Pekerja 0.2500 OH X Rp 29,000.00 = Rp 7,250.00
Tukang 0.7500 OH X Rp 32,500.00 = Rp 24,375.00
Kepala Tukang 0.0250 OH X Rp 35,000.00 = Rp 875.00
Mandor 0.0750 OH X Rp 35,000.00 = Rp 2,625.00
Jumlah I = Rp 35,125.00
Jumlah I + II Rp 378,375.00

1 m2 Pasang Rangka Partisi metal furing 60 x 60


Bahan
Profil metal furing 60 x 60 5.2000 m1 X Rp 5,000.00 = Rp 26,000.00
Sekrup Fixer 9.0000 bh X Rp 250.00 = Rp 2,250.00
Sealent 0.1200 tube X Rp 25,000.00 = Rp 3,000.00
Jumlah I = Rp 31,250.00
Tenaga
Pekerja 0.2500 OH X Rp 29,000.00 = Rp 7,250.00
Tukang 0.7500 OH X Rp 32,500.00 = Rp 24,375.00
Kepala Tukang 0.0250 OH X Rp 35,000.00 = Rp 875.00
Mandor 0.0750 OH X Rp 35,000.00 = Rp 2,625.00
Jumlah I = Rp 35,125.00
Jumlah I + II Rp 66,375.00

1 m2 Pasang Partsi gypsum 2 x board 9 mm


Bahan
gypsum board 9 mm 0.7280 lbr X Rp 50,000.00 = Rp 36,400.00
skrup fixer 24.0000 bh X Rp 250.00 = Rp 6,000.00
Jumlah I = Rp 42,400.00
Tenaga
Pekerja 0.2000 OH X Rp 29,000.00 = Rp 5,800.00
Tukang kayu 0.1000 OH X Rp 32,500.00 = Rp 3,250.00
Kepala Tukang 0.0100 OH X Rp 35,000.00 = Rp 350.00
Mandor 0.0100 OH X Rp 35,000.00 = Rp 350.00
Jumlah I = Rp 9,750.00
Jumlah I + II Rp 52,150.00

1 m2 Pasang Partsi gypsum 2 x 9 mm Rangka metal furing 60 x 60 118,525.00

1 m2 Pasang Rangka Partisi Metal stud


Bahan
Metal stud 4.2000 m1 X Rp 5,000.00 = Rp 21,000.00
Sekrup Fixer 9.0000 bh X Rp 250.00 = Rp 2,250.00
Jumlah I = Rp 23,250.00
Tenaga
Pekerja 0.2500 OH X Rp 29,000.00 = Rp 7,250.00
Tukang 0.7500 OH X Rp 32,500.00 = Rp 24,375.00
Kepala Tukang 0.0250 OH X Rp 35,000.00 = Rp 875.00
Mandor 0.0750 OH X Rp 35,000.00 = Rp 2,625.00
Jumlah I = Rp 35,125.00
Jumlah I + II Rp 58,375.00

1 m2 Pasang Partsi gypsum 2 x board 9 mm


Bahan
gypsum board 9 mm 0.7280 lbr X Rp 50,000.00 = Rp 36,400.00
skrup fixer 12.0000 bh X Rp 250.00 = Rp 3,000.00
Jumlah I = Rp 39,400.00
Tenaga
Pekerja 0.2000 OH X Rp 29,000.00 = Rp 5,800.00
Tukang kayu 0.1000 OH X Rp 32,500.00 = Rp 3,250.00
Kepala Tukang 0.0100 OH X Rp 35,000.00 = Rp 350.00
Mandor 0.0100 OH X Rp 35,000.00 = Rp 350.00
Jumlah I = Rp 9,750.00
Jumlah I + II Rp 49,150.00

1 m2 Pasang Partsi gypsum 2 x 9 mm Rangka Aluminium 4" 107,525.00

1 m2 Pasang Rangka plafond hollo 4/4


Bahan
hollo 4/4 4.1000 m1 X Rp 5,000.00 = Rp 20,500.00
Sekrup Fixer 9.0000 bh X Rp 250.00 = Rp 2,250.00
Jumlah I = Rp 22,750.00
Tenaga
Pekerja 0.1500 OH X Rp 29,000.00 = Rp 4,350.00
Tukang 0.3500 OH X Rp 32,500.00 = Rp 11,375.00
Kepala Tukang 0.0250 OH X Rp 35,000.00 = Rp 875.00
Mandor 0.0750 OH X Rp 35,000.00 = Rp 2,625.00
Jumlah I = Rp 19,225.00
Jumlah I + II Rp 41,975.00

VI.39 1 m2 Pasang Rangka langit - langit kayu kruing


VI.39.1 Bahan
Kayu kruing 0.0120 m3 X Rp 2,000,000.00 = Rp 24,000.00
Paku 0.1000 kg X Rp 12,000.00 = Rp 1,200.00
Jumlah I = Rp 25,200.00

VI.39.2 Tenaga
Pekerja 0.1500 OH X Rp 29,000.00 = Rp 4,350.00
Tukang kayu 0.2500 OH X Rp 32,500.00 = Rp 8,125.00
Kepala Tukang 0.0250 OH X Rp 35,000.00 = Rp 875.00
Mandor 0.0750 OH X Rp 35,000.00 = Rp 2,625.00
Jumlah I = Rp 15,975.00
Jumlah I + II Rp 41,175.00
IX.24 1 m2 Pasang langit - langit gypsum board 9 mm
IX.24.1 Bahan
gypsum board 9 mm 0.3640 lbr X Rp 50,000.00 = Rp 18,200.00
Paku 0.1100 kg X Rp 12,000.00 = Rp 1,320.00
Jumlah I = Rp 19,520.00
IX.24.2 Tenaga
Pekerja 0.1000 OH X Rp 29,000.00 = Rp 2,900.00
Tukang kayu 0.0500 OH X Rp 32,500.00 = Rp 1,625.00
Kepala Tukang 0.0050 OH X Rp 35,000.00 = Rp 175.00
Mandor 0.0050 OH X Rp 35,000.00 = Rp 175.00
Jumlah I = Rp 4,875.00
Jumlah I + II Rp 24,395.00

1 m2 Pasang langit - langit gypsum board 9 mm Rangka hollo 4/4 66,370.00

VI.39 1 m2 Pasang Rangka langit - langit kayu kruing


VI.39.1 Bahan
Kayu kruing 0.0120 m3 X Rp 2,000,000.00 = Rp 24,000.00
Paku 0.1000 kg X Rp 12,000.00 = Rp 1,200.00
Jumlah I = Rp 25,200.00
VI.39.2 Tenaga
Pekerja 0.1500 OH X Rp 29,000.00 = Rp 4,350.00
Tukang kayu 0.2500 OH X Rp 32,500.00 = Rp 8,125.00
Kepala Tukang 0.0250 OH X Rp 35,000.00 = Rp 875.00
Mandor 0.0750 OH X Rp 35,000.00 = Rp 2,625.00
Jumlah I = Rp 15,975.00
Jumlah I + II Rp 41,175.00

1 m1 Pasang list gypsum


Bahan
list gypsum 1.1000 m1 X Rp 10,000.00 = Rp 11,000.00
casting 0.1100 kg X Rp 15,000.00 = Rp 1,650.00
Jumlah I = Rp 12,650.00
Tenaga
Pekerja 0.1000 OH X Rp 29,000.00 = Rp 2,900.00
Tukang 0.0500 OH X Rp 32,500.00 = Rp 1,625.00
Kepala Tukang 0.0050 OH X Rp 35,000.00 = Rp 175.00
Mandor 0.0050 OH X Rp 35,000.00 = Rp 175.00
Jumlah I = Rp 4,875.00
Jumlah I + II Rp 17,525.00

VI.39 1 m2 Pasang rangka langit - langit 1 x 1 m kayu kruing


VI.39.1 Bahan
Kayu kruing balok 0.0120 m3 X Rp 2,000,000.00 = Rp 24,000.00
Paku 0.1000 kg X Rp 12,000.00 = Rp 1,200.00
Jumlah I = Rp 25,200.00
VI.39.2 Tenaga
Pekerja 0.1500 OH X Rp 29,000.00 = Rp 4,350.00
Tukang kayu 0.2500 OH X Rp 32,500.00 = Rp 8,125.00
Kepala Tukang 0.0250 OH X Rp 35,000.00 = Rp 875.00
Mandor 0.0750 OH X Rp 35,000.00 = Rp 2,625.00
Jumlah I = Rp 15,975.00
Jumlah I + II Rp 41,175.00

IX.3 1 m2 Pasang langit - langit 1 x 1 m t 4 mm


IX.3.1 Bahan
Asbes plat 1.1000 lbr X Rp 15,000.00 = Rp 16,500.00
Paku 0.0100 kg X Rp 12,000.00 = Rp 120.00
Jumlah I = Rp 16,620.00
IX.3.2 Tenaga
Pekerja 0.0300 OH X Rp 29,000.00 = Rp 870.00
Tukang kayu 0.0700 OH X Rp 32,500.00 = Rp 2,275.00
Kepala Tukang 0.0070 OH X Rp 35,000.00 = Rp 245.00
Mandor 0.0015 OH X Rp 35,000.00 = Rp 52.50
Jumlah I = Rp 3,442.50
Jumlah I + II Rp 20,062.50

1 m2 Pasang langit - langit asbes plat RK holo 62,037.50

1 m1 Pasang lis kayu 1/4


Bahan
Kayu lis Kkayu 1/4 1.0500 m1 X Rp 2,500.00 = Rp 2,625.00
Paku 0.0100 kg X Rp 12,000.00 = Rp 120.00
Jumlah I = Rp 2,745.00
Tenaga
Pekerja 0.0210 OH X Rp 29,000.00 = Rp 609.00
Tukang kayu 0.0210 OH X Rp 32,500.00 = Rp 682.50
Kepala Tukang 0.0020 OH X Rp 35,000.00 = Rp 70.00
Mandor 0.0010 OH X Rp 35,000.00 = Rp 35.00
Jumlah I = Rp 1,396.50
Jumlah I + II Rp 4,141.50

VI.2 1 m3 Pasang kusen kayu bengkirai


VI.2.1 Bahan
Kayu bengkirai balok 1.0500 m3 X Rp 4,500,000.00 = Rp 4,725,000.00
Jumlah I = Rp 4,725,000.00
VI.2.2 Tenaga
Pekerja 6.0000 OH X Rp 29,000.00 = Rp 174,000.00
Tukang kayu 18.0000 OH X Rp 32,500.00 = Rp 585,000.00
Kepala Tukang 2.0000 OH X Rp 35,000.00 = Rp 70,000.00
Mandor 0.3000 OH X Rp 35,000.00 = Rp 10,500.00
Jumlah I = Rp 839,500.00
Jumlah I + II Rp 5,564,500.00

1 m2 Pasang atap genteng Moranda Glazur Jatiwangi


Bahan
Genteng glazur keramik 16.0000 bh/lbr X Rp 3,000.00 = Rp 48,000.00
Jumlah I = Rp 48,000.00
Tenaga
Pekerja 0.0750 OH X Rp 29,000.00 = Rp 2,175.00
Tukang kayu 0.0320 OH X Rp 32,500.00 = Rp 1,040.00
Kepala Tukang 0.0040 OH X Rp 35,000.00 = Rp 140.00
Mandor 0.0040 OH X Rp 35,000.00 = Rp 140.00
Jumlah I = Rp 3,495.00
Jumlah I + II Rp 51,495.00

1 m1 Pasang bubungan
Bahan
Bubungan 5.0000 bh X Rp 7,000.00 = Rp 35,000.00
Jumlah I = Rp 35,000.00
Tenaga
Pekerja 0.2000 OH X Rp 29,000.00 = Rp 5,800.00
Tukang kayu 0.1000 OH X Rp 32,500.00 = Rp 3,250.00
Kepala Tukang 0.0100 OH X Rp 35,000.00 = Rp 350.00
Mandor 0.0010 OH X Rp 35,000.00 = Rp 35.00
Jumlah I = Rp 9,435.00
Jumlah I + II Rp 44,435.00

VIII.12 1 m2 Pasang asbes gelombang besar


VIII.12.1 Bahan
Asbes Gelombang 0.4400 lbr X Rp 60,000.00 = Rp 26,400.00
Paku pancing 0.1200 kg X Rp 12,000.00 = Rp 1,440.00
Jumlah I = Rp 26,400.00
VIII.12.2 Tenaga
Pekerja 0.1400 OH X Rp 29,000.00 = Rp 4,060.00
Tukang kayu 0.0670 OH X Rp 32,500.00 = Rp 2,177.50
Kepala Tukang 0.0070 OH X Rp 35,000.00 = Rp 245.00
Mandor 0.0070 OH X Rp 35,000.00 = Rp 245.00
Jumlah I = Rp 6,727.50
Jumlah I + II Rp 33,127.50

1 m2 Pasang Galvalum
Bahan
Galvalum 1.2000 m2 X Rp 90,000.00 = Rp 108,000.00
Paku pancing 0.1200 kg X Rp 12,000.00 = Rp 1,440.00
Jumlah I = Rp 109,440.00
Tenaga
Pekerja 0.1400 OH X Rp 29,000.00 = Rp 4,060.00
Tukang kayu 0.0670 OH X Rp 32,500.00 = Rp 2,177.50
Kepala Tukang 0.0070 OH X Rp 35,000.00 = Rp 245.00
Mandor 0.0070 OH X Rp 35,000.00 = Rp 245.00
Jumlah I = Rp 6,727.50
Jumlah I + II Rp 116,167.50

1 m1 Pasang bubungan genteng plentong kecil


Bahan
bubungan Genteng plentong 5.0000 bh X Rp 3,500.00 = Rp 17,500.00
Semen porland 8.0000 kg X Rp 1,200.00 = Rp 9,600.00
Pasir pasang 0.0320 m3 X Rp 95,000.00 = Rp 3,040.00
Jumlah I = Rp 17,500.00
Tenaga
Pekerja 0.4000 OH X Rp 29,000.00 = Rp 11,600.00
Tukang kayu 0.2000 OH X Rp 32,500.00 = Rp 6,500.00
Kepala Tukang 0.0200 OH X Rp 35,000.00 = Rp 700.00
Mandor 0.0020 OH X Rp 35,000.00 = Rp 70.00
Jumlah I = Rp 18,870.00
Jumlah I + II Rp 36,370.00

1 m1 Pasang papan reuter ukuran 2 / 20 kayu kruing


Bahan
Kayu kruing 0.0110 m3 X Rp 2,000,000.00 = Rp 22,000.00
Paku 0.0500 kg X Rp 12,000.00 = Rp 600.00
Jumlah I = Rp 22,600.00
Tenaga
Pekerja 0.1100 OH X Rp 29,000.00 = Rp 3,190.00
Tukang kayu 0.2200 OH X Rp 32,500.00 = Rp 7,150.00
Kepala Tukang 0.0220 OH X Rp 35,000.00 = Rp 770.00
Mandor 0.0050 OH X Rp 35,000.00 = Rp 175.00
Jumlah I = Rp 11,285.00
Jumlah I + II Rp 33,885.00

1 m1 Pasang listplang ukuran 2 / 30 kayu Bengkirai


Bahan
Kayu Bengkirai 0.0110 m3 X Rp 4,500,000.00 = Rp 49,500.00
Paku 0.0500 kg X Rp 12,000.00 = Rp 600.00
Jumlah I = Rp 50,100.00
Tenaga
Pekerja 0.1100 OH X Rp 29,000.00 = Rp 3,190.00
Tukang kayu 0.2200 OH X Rp 32,500.00 = Rp 7,150.00
Kepala Tukang 0.0220 OH X Rp 35,000.00 = Rp 770.00
Mandor 0.0050 OH X Rp 35,000.00 = Rp 175.00
Jumlah I = Rp 11,285.00
Jumlah I + II Rp 61,385.00

1 m1 Pasang RK atap kayu Bengkirai


Bahan
Kayu Bengkirai 1.1000 m3 X Rp 4,500,000.00 = Rp 4,950,000.00
Paku 3.0000 kg X Rp 12,000.00 = Rp 36,000.00
Jumlah I = Rp 4,986,000.00
Tenaga
Pekerja 2.4000 OH X Rp 29,000.00 = Rp 69,600.00
Tukang kayu 7.2000 OH X Rp 32,500.00 = Rp 234,000.00
Kepala Tukang 0.7200 OH X Rp 35,000.00 = Rp 25,200.00
Mandor 0.1200 OH X Rp 35,000.00 = Rp 4,200.00
Jumlah I = Rp 333,000.00
Jumlah I + II Rp 5,319,000.00

1 m2 Pasang pintu Pliwood 6 mm rangkap rk kayu bengkirai


Bahan
Kayu bengkirai papan 0.0196 m3 X Rp 4,500,000.00 = Rp 88,200.00
Paku 0.0300 kg X Rp 12,000.00 = Rp 360.00
Lem kayu 0.3000 ltr X Rp 25,000.00 = Rp 7,500.00
Pliwood 6 mm 1.0000 lbr X Rp 80,000.00 = Rp 80,000.00
Jumlah I = Rp 176,060.00
Tenaga
Pekerja 0.6000 OH X Rp 29,000.00 = Rp 17,400.00
Tukang kayu 2.0000 OH X Rp 32,500.00 = Rp 65,000.00
Kepala Tukang 0.2000 OH X Rp 35,000.00 = Rp 7,000.00
Mandor 0.0300 OH X Rp 35,000.00 = Rp 1,050.00
Jumlah I = Rp 90,450.00
Jumlah I + II Rp 266,510.00

1 m2 Pasang pintu kaca t 12 mm


Bahan
Kaca 12 mm 1.1000 m2 X Rp 175,000.00 = Rp 192,500.00
assesoris 0.15 hrga X Rp 175,000.00 = Rp 26,250.00
Jumlah I = Rp 192,500.00
Tenaga
Pekerja 0.1150 OH X Rp 29,000.00 = Rp 3,335.00
Tukang kaca 0.4500 OH X Rp 32,500.00 = Rp 14,625.00
Kepala Tukang 0.1150 OH X Rp 35,000.00 = Rp 4,025.00
Mandor 0.0108 OH X Rp 35,000.00 = Rp 376.25
Jumlah I = Rp 22,361.25
Jumlah I + II Rp 214,861.25

1 m2 Pasang pintu aluminium


Bahan
panil aluminium 1.1000 m2 X Rp 25,000.00 = Rp 27,500.00
assesoris 0.15 hrga X Rp 25,000.00 = Rp 3,750.00
Jumlah I = Rp 27,500.00
Tenaga
Pekerja 0.0150 OH X Rp 29,000.00 = Rp 435.00
Tukang kaca 0.1500 OH X Rp 32,500.00 = Rp 4,875.00
Kepala Tukang 0.0150 OH X Rp 35,000.00 = Rp 525.00
Mandor 0.0008 OH X Rp 35,000.00 = Rp 26.25
Jumlah I = Rp 5,861.25
Jumlah I + II Rp 33,361.25
6,17 1 m2 Pasang kaca warna tebal 6 mm
6,.17.1 Bahan
Kaca warna 6 mm 1.1000 m2 X Rp 130,000.00 = Rp 143,000.00
Jumlah I = Rp 143,000.00
6,17.2 Tenaga
Pekerja 0.0150 OH X Rp 29,000.00 = Rp 435.00
Tukang kaca 0.1500 OH X Rp 32,500.00 = Rp 4,875.00
Kepala Tukang 0.0150 OH X Rp 35,000.00 = Rp 525.00
Mandor 0.0008 OH X Rp 35,000.00 = Rp 26.25
Jumlah I = Rp 5,861.25
Jumlah I + II Rp 148,861.25

6,17 1 m2 Pasang kaca bening tebal 5 mm


6,.17.1 Bahan
Kaca kaca bening tebal 5 mm 1.1000 m2 X Rp 75,000.00 = Rp 82,500.00
Jumlah I = Rp 82,500.00
6,17.2 Tenaga
Pekerja 0.0150 OH X Rp 29,000.00 = Rp 435.00
Tukang kaca 0.1500 OH X Rp 32,500.00 = Rp 4,875.00
Kepala Tukang 0.0150 OH X Rp 35,000.00 = Rp 525.00
Mandor 0.0008 OH X Rp 35,000.00 = Rp 26.25
Jumlah I = Rp 5,861.25
Jumlah I + II Rp 88,361.25

6,13 1 m2 Pasang daun Bouven kaca rk Aluminium Silver


6,13.1 Bahan
Rk Aluminium 6.8000 m1 X Rp 5,000.00 = Rp 34,000.00
Kaca es 5 mm 0.6400 m2 X Rp 85,000.00 = Rp 54,400.00
Sealent 0.3700 tube X Rp 25,000.00 = Rp 9,250.00
Jumlah I = Rp 97,650.00

6,13.2 Tenaga
Pekerja 0.0950 OH X Rp 29,000.00 = Rp 2,755.00
Tukang 0.0950 OH X Rp 32,500.00 = Rp 3,087.50
Kepala Tukang 0.0090 OH X Rp 35,000.00 = Rp 315.00
Mandor 0.0050 OH X Rp 35,000.00 = Rp 175.00
Jumlah I = Rp 6,332.50
Jumlah I + II Rp 103,982.50

6,13 1 m2 Pasang daun pintu kaca rk Aluminium


6,13.1 Bahan
Rk Aluminium 4.4000 m1 X Rp 5,000.00 = Rp 22,000.00
profil kaca 4.5000 m1 X Rp 1,500.00 = Rp 6,750.00
Sealent 0.2700 tube X Rp 25,000.00 = Rp 6,750.00
Jumlah I = Rp 35,500.00

6,13.2 Tenaga
Pekerja 0.0850 OH X Rp 29,000.00 = Rp 2,465.00
Tukang Kontruksi besi 0.0850 OH X Rp 32,500.00 = Rp 2,762.50
Kepala Tukang 0.0080 OH X Rp 35,000.00 = Rp 280.00
Mandor 0.0040 OH X Rp 35,000.00 = Rp 140.00
Jumlah I = Rp 5,647.50
Jumlah I + II Rp 41,147.50

6,13 1 m2 Pasang daun Jendela kaca rk Aluminium


6,13.1 Bahan
Rk Aluminium 4.4000 m1 X Rp 5,000.00 = Rp 22,000.00
profil kaca 4.5000 m1 X Rp 1,500.00 = Rp 6,750.00
Sealent 0.2700 tube X Rp 25,000.00 = Rp 6,750.00
Jumlah I = Rp 35,500.00

6,13.2 Tenaga
Pekerja 0.0850 OH X Rp 29,000.00 = Rp 2,465.00
Tukang Kontruksi besi 0.0850 OH X Rp 32,500.00 = Rp 2,762.50
Kepala Tukang 0.0080 OH X Rp 35,000.00 = Rp 280.00
Mandor 0.0040 OH X Rp 35,000.00 = Rp 140.00
Jumlah I = Rp 5,647.50
Jumlah I + II Rp 41,147.50

6,13 1 m2 Pasang daun Jendela kaca warna 6 mm rk Aluminium


6,13.1 Bahan
Rk Aluminium 3.7000 m1 X Rp 5,000.00 = Rp 18,500.00
Kaca warna 6 mm 0.8600 m1 X Rp 130,000.00 = Rp 111,800.00
Sealent 0.2700 tube X Rp 25,000.00 = Rp 6,750.00
Jumlah I = Rp 137,050.00

6,13.2 Tenaga
Pekerja 0.0850 OH X Rp 29,000.00 = Rp 2,465.00
Tukang Kontruksi besi 0.0850 OH X Rp 32,500.00 = Rp 2,762.50
Kepala Tukang 0.0080 OH X Rp 35,000.00 = Rp 280.00
Mandor 0.0040 OH X Rp 35,000.00 = Rp 140.00
Jumlah I = Rp 5,647.50
Jumlah I + II Rp 142,697.50

6,13 1 m2 Pasang daun Jendela kaca es 5 mm rk Aluminium


6,13.1 Bahan
Rk Aluminium 3.7000 m1 X Rp 5,000.00 = Rp 18,500.00
Kaca es 5 mm 0.8600 m1 X Rp 85,000.00 = Rp 73,100.00
Sealent 0.2700 tube X Rp 25,000.00 = Rp 6,750.00
Jumlah I = Rp 98,350.00

6,13.2 Tenaga
Pekerja 0.0850 OH X Rp 29,000.00 = Rp 2,465.00
Tukang Kontruksi besi 0.0850 OH X Rp 32,500.00 = Rp 2,762.50
Kepala Tukang 0.0080 OH X Rp 35,000.00 = Rp 280.00
Mandor 0.0040 OH X Rp 35,000.00 = Rp 140.00
Jumlah I = Rp 5,647.50
Jumlah I + II Rp 103,997.50

6,11 1 m1 Pasang kusen Aluminium 4" Silver


6,11.1 Bahan
Profil allumunium 4" Silver 1.1000 m1 X Rp 65,000.00 = Rp 71,500.00
Skrup fixer 2.0000 m2 X Rp 250.00 = Rp 500.00
Sealent 0.0600 tube X Rp 25,000.00 = Rp 1,500.00
Jumlah I = Rp 73,500.00

6,11.2 Tenaga
Pekerja 0.4300 OH X Rp 29,000.00 = Rp 12,470.00
Tukang Kontruksi besi 0.4300 OH X Rp 32,500.00 = Rp 13,975.00
Kepala Tukang 0.0043 OH X Rp 35,000.00 = Rp 150.50
Mandor 0.0021 OH X Rp 35,000.00 = Rp 73.50
Jumlah I = Rp 26,669.00
Jumlah I + II Rp 100,169.00

6,42 1 m2 Pasang aluminium foil


6,42.1 Bahan
aluminium foil 1.0500 m1 X Rp 8,000.00 = Rp 8,400.00
Jumlah I = Rp 8,400.00
6,42.2 Tenaga
Pekerja 0.1500 OH X Rp 29,000.00 = Rp 4,350.00
Tukang kayu 0.0500 OH X Rp 32,500.00 = Rp 1,625.00
Kepala Tukang 0.0050 OH X Rp 35,000.00 = Rp 175.00
Mandor 0.0080 OH X Rp 35,000.00 = Rp 280.00
Jumlah I = Rp 6,430.00
Jumlah I + II Rp 14,830.00

6,1 Memasang 1 bh closed duduk / monoblock


6,1.1 Bahan
klosed duduk / monoblock 1.0000 bh X Rp 1,250,000.00 = Rp 1,250,000.00
Perlengkapan 6.0000 % X Rp 1,250,000.00 = Rp 75,000.00
Jumlah I = Rp 1,325,000.00
6,1.2 Tenaga
Pekerja 3.3000 OH X Rp 29,000.00 = Rp 95,700.00
Tukang batu 1.1000 OH X Rp 32,500.00 = Rp 35,750.00
Kepala Tukang 0.0010 OH X Rp 35,000.00 = Rp 35.00
Mandor 0.1600 OH X Rp 35,000.00 = Rp 5,600.00
Jumlah I = Rp 137,085.00
Jumlah I + II Rp 1,462,085.00

6,2 Memasang 1 bh closed jongkok


6,2,1 Bahan
klosed jongkok 1.0000 bh X Rp 150,000.00 = Rp 150,000.00
Semen porland 6.0000 kg X Rp 1,200.00 = Rp 7,200.00
Pasir Pasang 0.0100 m3 X Rp 95,000.00 = Rp 950.00
Jumlah I = Rp 158,150.00
6,2,2 Tenaga
Pekerja 1.0000 OH X Rp 29,000.00 = Rp 29,000.00
Tukang batu 1.5000 OH X Rp 32,500.00 = Rp 48,750.00
Kepala Tukang 1.5000 OH X Rp 35,000.00 = Rp 52,500.00
Mandor 0.1600 OH X Rp 35,000.00 = Rp 5,600.00
Jumlah I = Rp 135,850.00
Jumlah I + II Rp 294,000.00

6,4 1 memasang 1 bh urinoir


6.4.1 Bahan
urinoir 1.0000 bh X Rp 750,000.00 = Rp 750,000.00
Perlengkapan 30.0000 % X Rp 225,000.00 = Rp 67,500.00
Pasir pasang 0.0100 m3 X Rp 95,000.00 = Rp 950.00
Semen porland 6.0000 kg X Rp 1,200.00 = Rp 7,200.00
Jumlah I = Rp 825,650.00
6.4.2 Tenaga
Pekerja 1.0000 OH X Rp 29,000.00 = Rp 29,000.00
Tukang batu 1.0000 OH X Rp 32,500.00 = Rp 32,500.00
Kepala Tukang 1.0000 OH X Rp 35,000.00 = Rp 35,000.00
Semen porland 0.1000 OH X Rp 35,000.00 = Rp 3,500.00
Jumlah I = Rp 100,000.00
Jumlah I + II Rp 925,650.00

X.5 memasang 1 bh wastavel


X.5.1 Bahan
Wastavel 1.0000 bh X Rp 1,000,000.00 = Rp 1,000,000.00
Perlengkapan 12.0000 % X Rp 120,000.00 = Rp 14,400.00
Pasir pasang 0.0100 m3 X Rp 95,000.00 = Rp 950.00
Semen porland 6.0000 kg X Rp 1,200.00 = Rp 7,200.00
Jumlah I = Rp 1,022,550.00
X.5.2 Tenaga
Pekerja 1.2000 OH X Rp 29,000.00 = Rp 34,800.00
Tukang batu 1.4500 OH X Rp 32,500.00 = Rp 47,125.00
Kepala Tukang 0.1500 OH X Rp 35,000.00 = Rp 5,250.00
Mandor 0.1000 OH X Rp 35,000.00 = Rp 3,500.00
Jumlah I = Rp 90,675.00
Jumlah I + II Rp 1,113,225.00

X.7 memasang 1 bh bak air fiberglass kap 0,3 m3


X.7.1 Bahan
Bak fiberglass 1.0000 bh X Rp 250,000.00 = Rp 250,000.00
Perlengkapan 18.0000 % X Rp 45,000.00 = Rp 8,100.00
Jumlah I = Rp 258,100.00
X.7.2 Tenaga
Pekerja 1.8000 OH X Rp 29,000.00 = Rp 52,200.00
Tukang batu 2.7000 OH X Rp 32,500.00 = Rp 87,750.00
Kepala Tukang 0.5400 OH X Rp 35,000.00 = Rp 18,900.00
Mandor 0.1100 OH X Rp 35,000.00 = Rp 3,850.00
Jumlah I = Rp 162,700.00
Jumlah I + II Rp 420,800.00

X.36 memasang 1 bh Flordrain


X.36.1 Bahan
Floordrain 1.0000 bh X Rp 25,000.00 = Rp 25,000.00
Jumlah I = Rp 25,000.00
X.36.2 Tenaga
Pekerja 0.0100 OH X Rp 29,000.00 = Rp 290.00
Tukang batu 0.1000 OH X Rp 32,500.00 = Rp 3,250.00
Kepala Tukang 0.0100 OH X Rp 35,000.00 = Rp 350.00
Mandor 0.0050 OH X Rp 35,000.00 = Rp 175.00
Jumlah I = Rp 4,065.00
Jumlah I + II Rp 33,275.00

X.35 memasang 1 bh kran air Ø 3/4" atau 1/2 "


X.35.1 Bahan
Kran air 1.0000 bh X Rp 35,000.00 = Rp 35,000.00
Seal tape 0.0250 bh X Rp 1,500.00 = Rp 37.50
Jumlah I = Rp 35,037.50
X.35.2 Tenaga
Pekerja 0.0100 OH X Rp 29,000.00 = Rp 290.00
Tukang batu 0.1000 OH X Rp 32,500.00 = Rp 3,250.00
Kepala Tukang 0.0100 OH X Rp 35,000.00 = Rp 350.00
Mandor 0.0050 OH X Rp 35,000.00 = Rp 175.00
Jumlah I = Rp 4,065.00
Jumlah I + II Rp 43,312.50

XI.1 memasang 1 kg rk atap baja


XI.1.1 Bahan
Besi Siku 1.1000 kg X Rp 8,000.00 = Rp 8,800.00
Meni besi 0.0800 kg X Rp 12,500.00 = Rp 1,000.00
Jumlah I = Rp 9,800.00
XI.1.2 Tenaga
Pekerja 0.0060 OH X Rp 29,000.00 = Rp 174.00
Tukang besi 0.0600 OH X Rp 32,500.00 = Rp 1,950.00
Kepala Tukang 0.0060 OH X Rp 35,000.00 = Rp 210.00
Mandor 0.0003 OH X Rp 35,000.00 = Rp 10.50
Jumlah I = Rp 2,344.50
Jumlah I + II Rp 12,144.50

XI.1 memasang 1 kg pasang mur / baut


XI.1.1 Bahan
Mur baut 1.1000 kg X Rp 8,000.00 = Rp 8,800.00
Meni besi 0.0800 kg X Rp 12,500.00 = Rp 1,000.00
Jumlah I = Rp 9,800.00
XI.1.2 Tenaga
Pekerja 0.0060 OH X Rp 29,000.00 = Rp 174.00
Tukang besi kontruksi 0.0600 OH X Rp 32,500.00 = Rp 1,950.00
Kepala Tukang kontruksi 0.0060 OH X Rp 35,000.00 = Rp 210.00
Mandor 0.0003 OH X Rp 35,000.00 = Rp 10.50
Jumlah I = Rp 2,344.50
Jumlah I + II Rp 12,144.50

Memasang 1 kg pasang kontruksi atap dgn besi polos


Bahan
Besi beton polos 1.1000 kg X Rp 8,000.00 = Rp 8,800.00
Meni besi 0.0800 kg X Rp 12,500.00 = Rp 1,000.00
Jumlah I = Rp 9,800.00
Tenaga
Pekerja 0.0060 OH X Rp 29,000.00 = Rp 174.00
Tukang besi kontruksi 0.0600 OH X Rp 32,500.00 = Rp 1,950.00
Kepala Tukang kontruksi 0.0060 OH X Rp 35,000.00 = Rp 210.00
Mandor 0.0003 OH X Rp 35,000.00 = Rp 10.50
Jumlah I = Rp 2,344.50
Jumlah I + II Rp 12,144.50

XI.6 memasang 1 m2 pintu Lipat


XI.6.1 Bahan
Pintu Lipat 1.0000 m2 X Rp 450,000.00 = Rp 450,000.00
Jumlah I = Rp 450,000.00
XI.6.2 Tenaga
Pekerja 0.4400 OH X Rp 29,000.00 = Rp 12,760.00
Tukang besi kontruksi 0.4400 OH X Rp 32,500.00 = Rp 14,300.00
Kepala Tukang kontruksi 0.0440 OH X Rp 35,000.00 = Rp 1,540.00
Mandor 0.0220 OH X Rp 35,000.00 = Rp 770.00
Jumlah I = Rp 29,370.00
Jumlah I + II Rp 479,370.00

Memasang 1 m2 pipa hollo 2/4


Bahan
Hollow galvanis 2/4 15.2000 m1 X Rp 7,500.00 = Rp 114,000.00
Perlengkapan 0.3500 % X Rp 2,625.00 = Rp 918.75
Jumlah I = Rp 114,918.75
Tenaga
Pekerja 0.5080 OH X Rp 29,000.00 = Rp 14,732.00
Tukang pipa 0.9800 OH X Rp 32,500.00 = Rp 31,850.00
Kepala Tukang 0.0900 OH X Rp 35,000.00 = Rp 3,150.00
Mandor 0.0154 OH X Rp 35,000.00 = Rp 539.00
Jumlah I = Rp 50,271.00
Jumlah I + II Rp 165,189.75

Memasang 1 m1 pipa stainlesteel Ø 1"


Bahan
Pipa stainlessteel Ø 1" 1.2000 m1 X Rp 10,000.00 = Rp 12,000.00
Perlengkapan 0.3500 % X Rp 10,000.00 = Rp 3,500.00
Jumlah I = Rp 15,500.00
Tenaga
Pekerja 0.1080 OH X Rp 29,000.00 = Rp 3,132.00
Tukang pipa 0.1800 OH X Rp 32,500.00 = Rp 5,850.00
Kepala Tukang 0.0800 OH X Rp 35,000.00 = Rp 2,800.00
Mandor 0.0054 OH X Rp 35,000.00 = Rp 189.00
Jumlah I = Rp 11,971.00
Jumlah I + II Rp 27,471.00

Memasang 1 m1 pipa stainlesteel Ø 2"


Bahan
Pipa stainlessteel Ø 2" 1.2000 m1 X Rp 20,000.00 = Rp 24,000.00
Perlengkapan 0.3500 % X Rp 20,000.00 = Rp 7,000.00
Jumlah I = Rp 31,000.00
Tenaga
Pekerja 0.1080 OH X Rp 29,000.00 = Rp 3,132.00
Tukang pipa 0.1800 OH X Rp 32,500.00 = Rp 5,850.00
Kepala Tukang 0.0800 OH X Rp 35,000.00 = Rp 2,800.00
Mandor 0.0054 OH X Rp 35,000.00 = Rp 189.00
Jumlah I = Rp 11,971.00
Jumlah I + II Rp 42,971.00

Memasang 1 m1 pipa stainlesteel Ø 3"


Bahan
Pipa stainlessteel Ø 3" 1.2000 m1 X Rp 45,000.00 = Rp 54,000.00
Perlengkapan 0.3500 % X Rp 45,000.00 = Rp 15,750.00
Jumlah I = Rp 69,750.00
Tenaga
Pekerja 0.1080 OH X Rp 29,000.00 = Rp 3,132.00
Tukang pipa 0.1800 OH X Rp 32,500.00 = Rp 5,850.00
Kepala Tukang 0.0800 OH X Rp 35,000.00 = Rp 2,800.00
Mandor 0.0054 OH X Rp 35,000.00 = Rp 189.00
Jumlah I = Rp 11,971.00
Jumlah I + II Rp 81,721.00

Memasang 1 m1 pipa stainlessteel Ø 3/4"


Bahan
Pipa stainlessteel Ø 3/4" 1.2000 m1 X Rp 8,000.00 = Rp 9,600.00
Perlengkapan 0.3500 % X Rp 2,800.00 = Rp 980.00
Jumlah I = Rp 10,580.00
Tenaga
Pekerja 0.1080 OH X Rp 29,000.00 = Rp 3,132.00
Tukang pipa 0.1800 OH X Rp 32,500.00 = Rp 5,850.00
Kepala Tukang 0.0800 OH X Rp 35,000.00 = Rp 2,800.00
Mandor 0.0054 OH X Rp 35,000.00 = Rp 189.00
Jumlah I = Rp 11,971.00
Jumlah I + II Rp 22,551.00

Memasang 1 m1 pipa stainlessteel Ø 1/2"


Bahan
Pipa stainlessteel Ø 1/2" 1.2000 m1 X Rp 7,000.00 = Rp 8,400.00
Perlengkapan 0.3500 % X Rp 7,000.00 = Rp 2,450.00
Jumlah I = Rp 10,850.00
Tenaga
Pekerja 0.1080 OH X Rp 29,000.00 = Rp 3,132.00
Tukang pipa 0.1800 OH X Rp 32,500.00 = Rp 5,850.00
Kepala Tukang 0.0800 OH X Rp 35,000.00 = Rp 2,800.00
Mandor 0.0054 OH X Rp 35,000.00 = Rp 189.00
Jumlah I = Rp 11,971.00
Jumlah I + II Rp 22,821.00

Memasang 1 m1 pipa gavanis Ø 4"


Bahan
Pipa gavanis Ø 4" 1.2000 m1 X Rp 100,000.00 = Rp 120,000.00
Perlengkapan 0.3500 % X Rp 100,000.00 = Rp 35,000.00
Jumlah I = Rp 155,000.00
Tenaga
Pekerja 0.1080 OH X Rp 29,000.00 = Rp 3,132.00
Tukang pipa 0.1800 OH X Rp 32,500.00 = Rp 5,850.00
Kepala Tukang 0.0180 OH X Rp 35,000.00 = Rp 630.00
Mandor 0.0054 OH X Rp 35,000.00 = Rp 189.00
Jumlah I = Rp 9,801.00
Jumlah I + II Rp 164,801.00

Memasang 1 m1 pipa gavanis Ø 3"


Bahan
Pipa gavanis Ø 3" 1.2000 m1 X Rp 83,333.33 = Rp 100,000.00
Perlengkapan 0.3500 % X Rp 83,333.33 = Rp 29,166.67
Jumlah I = Rp 129,166.67
Tenaga
Pekerja 0.1080 OH X Rp 29,000.00 = Rp 3,132.00
Tukang pipa 0.1800 OH X Rp 32,500.00 = Rp 5,850.00
Kepala Tukang 0.0180 OH X Rp 35,000.00 = Rp 630.00
Mandor 0.0054 OH X Rp 35,000.00 = Rp 189.00
Jumlah I = Rp 9,801.00
Jumlah I + II Rp 138,967.67

Memasang 1 m1 Talang PVC U 15


Bahan
Pipa PVC U 20 1.2000 m1 X Rp 20,000.00 = Rp 24,000.00
Perlengkapan 0.3500 % X Rp 7,000.00 = Rp 2,450.00
Jumlah I = Rp 26,450.00
Tenaga
Pekerja 0.0810 OH X Rp 29,000.00 = Rp 2,349.00
Tukang batu 0.1350 OH X Rp 32,500.00 = Rp 4,387.50
Kepala Tukang 0.0135 OH X Rp 35,000.00 = Rp 472.50
Mandor 0.0041 OH X Rp 35,000.00 = Rp 143.50
Jumlah I = Rp 7,352.50
Jumlah I + II Rp 33,802.50

Memasang 1 m1 Talang PVC U 20


Bahan
Pipa PVC U 20 1.2000 m1 X Rp 22,500.00 = Rp 27,000.00
Perlengkapan 0.3500 % X Rp 22,500.00 = Rp 7,875.00
Jumlah I = Rp 34,875.00
Tenaga
Pekerja 0.0810 OH X Rp 29,000.00 = Rp 2,349.00
Tukang batu 0.1350 OH X Rp 32,500.00 = Rp 4,387.50
Kepala Tukang 0.0135 OH X Rp 35,000.00 = Rp 472.50
Mandor 0.0041 OH X Rp 35,000.00 = Rp 143.50
Jumlah I = Rp 7,352.50
Jumlah I + II Rp 42,227.50

6,29 Memasang 1 m1 pipa PVC tipe AW Ø 2"


6,29,1 Bahan
Pipa PVC 2" 1.2000 m1 X Rp 18,750.00 = Rp 22,500.00
Perlengkapan 0.3500 % X Rp 18,750.00 = Rp 6,562.50
Jumlah I = Rp 29,062.50
6,29,2 Tenaga
Pekerja 0.0540 OH X Rp 29,000.00 = Rp 1,566.00
Tukang batu 0.0900 OH X Rp 32,500.00 = Rp 2,925.00
Kepala Tukang 0.0090 OH X Rp 35,000.00 = Rp 315.00
Mandor 0.0027 OH X Rp 35,000.00 = Rp 94.50
Jumlah I = Rp 4,900.50
Jumlah I + II Rp 33,963.00

6,31 Memasang 1 m1 pipa PVC tipe AW Ø 3"


6,31,1 Bahan
Pipa PVC 3" 1.2000 m1 X Rp 31,250.00 = Rp 37,500.00
Perlengkapan 0.3500 % X Rp 31,250.00 = Rp 10,937.50
Jumlah I = Rp 48,437.50
6,31,2 Tenaga
Pekerja 0.0810 OH X Rp 29,000.00 = Rp 2,349.00
Tukang batu 0.1350 OH X Rp 32,500.00 = Rp 4,387.50
Kepala Tukang 0.0135 OH X Rp 35,000.00 = Rp 472.50
Mandor 0.0041 OH X Rp 35,000.00 = Rp 143.50
Jumlah I = Rp 7,352.50
Jumlah I + II Rp 55,790.00

6,31 Memasang 1 m1 pipa PVC tipe AW Ø 4"


6,31,1 Bahan
Pipa PVC 4" 1.2000 m1 X Rp 37,500.00 = Rp 45,000.00
Perlengkapan 0.3500 % X Rp 37,500.00 = Rp 13,125.00
Jumlah I = Rp 58,125.00
6,31,2 Tenaga
Pekerja 0.0810 OH X Rp 29,000.00 = Rp 2,349.00
Tukang batu 0.1350 OH X Rp 32,500.00 = Rp 4,387.50
Kepala Tukang 0.0135 OH X Rp 35,000.00 = Rp 472.50
Mandor 0.0041 OH X Rp 35,000.00 = Rp 143.50
Jumlah I = Rp 7,352.50
Jumlah I + II Rp 65,477.50

1 m1 saluran U 30 + pasangan bata


Bahan
Upah Meletakkan 45.0000 m3 X Rp 250.00 = Rp 11,250.00
Siar 1 pc : 2 ps 0.0260 kg X Rp 18,218.00 = Rp 473.67
Mengurug pasir 0.0735 m3 X Rp 69,050.00 = Rp 5,075.18
Menggali tanah 0.3000 m3 X Rp 22,625.00 = Rp 6,787.50
Pasangan bata 1 : 6 0.1400 m3 X Rp 566,316.00 = Rp 79,284.24
Plester 1 : 3 0.8000 m2 X Rp 23,066.20 = Rp 18,452.96
Jumlah Rp 121,323.54

6,.14 1 m2 Cat tembok 1 lapis plamir, 1 lapir cat dasar, 2 lapis cat penutup
6,14.1 Bahan
plamir tembok 0.1000 kg X Rp 15,000.00 = Rp 1,500.00
Cat dasar 0.1000 kg X Rp 15,000.00 = Rp 1,500.00
Cat Penutup 2x 0.2600 kg X Rp 15,000.00 = Rp 3,900.00
Jumlah I = Rp 6,900.00
6,14.2 Tenaga
Pekerja 0.0200 OH X Rp 29,000.00 = Rp 580.00
Tukang cat 0.0630 OH X Rp 32,500.00 = Rp 2,047.50
Kepala Tukang 0.0063 OH X Rp 35,000.00 = Rp 220.50
Mandor 0.0025 OH X Rp 35,000.00 = Rp 87.50
Jumlah I = Rp 2,935.50
Jumlah I + II Rp 9,835.50

6,.14 1 m2 Cat tembok Exterior, 1 lapis cat dasar, 2 lapis cat penutup
6,14.1 Bahan
Cat dasar 0.1000 kg X Rp 15,000.00 = Rp 1,500.00
Cat Penutup 2x 0.2600 kg X Rp 25,000.00 = Rp 6,500.00
Jumlah I = Rp 8,000.00
6,14.2 Tenaga
Pekerja 0.0200 OH X Rp 29,000.00 = Rp 580.00
Tukang cat 0.0630 OH X Rp 32,500.00 = Rp 2,047.50
Kepala Tukang 0.0063 OH X Rp 35,000.00 = Rp 220.50
Mandor 0.0025 OH X Rp 35,000.00 = Rp 87.50
Jumlah I = Rp 2,935.50
Jumlah I + II Rp 10,935.50

6,11 1 m2 Cat Plitur


6,11,1 Bahan
Politur 0.1500 ltr X Rp 20,000.00 = Rp 3,000.00
Politur jadi 0.3720 ltr X Rp 20,000.00 = Rp 7,440.00
Amplas 2.0000 lbr X Rp 2,500.00 = Rp 5,000.00
Jumlah I = Rp 15,440.00
6,11,2 Tenaga
Pekerja 0.0000 OH X Rp 29,000.00 = Rp 0.00
Tukang cat 0.0600 OH X Rp 32,500.00 = Rp 1,950.00
Kepala Tukang 0.0160 OH X Rp 35,000.00 = Rp 560.00
Mandor 0.0025 OH X Rp 35,000.00 = Rp 87.50
Jumlah I = Rp 2,597.50
Jumlah I + II Rp 18,037.50

XIV.8 1 m2 Cat kayu baru 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup
Bahan
Meni kayu 0.2000 kg X Rp 20,000.00 = Rp 4,000.00
plamir 0.1500 kg X Rp 15,000.00 = Rp 2,250.00
Cat dasar 0.1700 kg X Rp 17,500.00 = Rp 2,975.00
Cat Penutup 0.2600 kg X Rp 20,000.00 = Rp 5,200.00
Jumlah I = Rp 14,425.00
Tenaga
Pekerja 0.0700 OH X Rp 29,000.00 = Rp 2,030.00
Tukang cat 0.0090 OH X Rp 32,500.00 = Rp 292.50
Kepala Tukang 0.0060 OH X Rp 35,000.00 = Rp 210.00
Mandor 0.0025 OH X Rp 35,000.00 = Rp 87.50
Jumlah I = Rp 2,620.00
Jumlah I + II Rp 17,045.00

1 m2 Cat Waterprofing
Bahan
Waterprofing 0.7500 kg X Rp 25,000.00 = Rp 18,750.00
Jumlah I = Rp 18,750.00
Tenaga
Pekerja 0.0350 OH X Rp 29,000.00 = Rp 1,015.00
Tukang cat 0.0550 OH X Rp 32,500.00 = Rp 1,787.50
Kepala Tukang 0.0040 OH X Rp 35,000.00 = Rp 140.00
Mandor 0.0025 OH X Rp 35,000.00 = Rp 87.50
Jumlah I = Rp 3,030.00
Jumlah I + II Rp 21,780.00

6,11 1 bh pasang kunci 2 X Slagg


6,11,1 Bahan
Kunci 2 X Slagg 1.0000 bh X Rp 100,000.00 = Rp 100,000.00
Jumlah I = Rp 100,000.00
6,11,2 Tenaga
Pekerja 0.0100 OH X Rp 29,000.00 = Rp 290.00
Tukang kayu 0.5000 OH X Rp 32,500.00 = Rp 16,250.00
Kepala Tukang 0.0100 OH X Rp 35,000.00 = Rp 350.00
Mandor 0.0050 OH X Rp 35,000.00 = Rp 175.00
Jumlah I = Rp 17,065.00
Jumlah I + II Rp 117,065.00

6,5 1 bh pasang engsel pintu


6,5.1 Bahan
Engsel 1.0000 bh X Rp 10,000.00 = Rp 10,000.00
Jumlah I = Rp 10,000.00
6,5.2 Tenaga
Pekerja 0.0150 OH X Rp 29,000.00 = Rp 435.00
Tukang kayu 0.1500 OH X Rp 32,500.00 = Rp 4,875.00
Kepala Tukang 0.0150 OH X Rp 35,000.00 = Rp 525.00
Mandor 0.0075 OH X Rp 35,000.00 = Rp 262.50
Jumlah I = Rp 6,097.50
Jumlah I + II Rp 16,097.50

6,5 1 bh pasang engsel jendela


6,5.1 Bahan
Engsel 1.0000 bh X Rp 7,500.00 = Rp 7,500.00
Jumlah I = Rp 7,500.00
6,5.2 Tenaga
Pekerja 0.0100 OH X Rp 29,000.00 = Rp 290.00
Tukang kayu 0.1000 OH X Rp 32,500.00 = Rp 3,250.00
Kepala Tukang 0.0100 OH X Rp 35,000.00 = Rp 350.00
Mandor 0.0005 OH X Rp 35,000.00 = Rp 17.50
Jumlah I = Rp 3,907.50
Jumlah I + II Rp 11,407.50

6,9 1 bh pasang kait angin


6,9.1 Bahan
kait angin 1.0000 bh X Rp 15,000.00 = Rp 15,000.00
Jumlah I = Rp 15,000.00
6,9.2 Tenaga
Pekerja 0.0150 OH X Rp 29,000.00 = Rp 435.00
Tukang kayu 0.1500 OH X Rp 32,500.00 = Rp 4,875.00
Kepala Tukang 0.0150 OH X Rp 35,000.00 = Rp 525.00
Mandor 0.0008 OH X Rp 35,000.00 = Rp 26.25
Jumlah I = Rp 5,861.25
Jumlah I + II Rp 20,861.25

1 bh pasang pegangan kunci/door holder


Bahan
Door holder 1.0000 bh X Rp 15,000.00 = Rp 15,000.00
Jumlah I = Rp 15,000.00
Tenaga
Pekerja 0.0500 OH X Rp 29,000.00 = Rp 1,450.00
Tukang kayu 0.5000 OH X Rp 32,500.00 = Rp 16,250.00
Kepala Tukang 0.0500 OH X Rp 35,000.00 = Rp 1,750.00
Mandor 0.0025 OH X Rp 35,000.00 = Rp 87.50
Jumlah I = Rp 19,537.50
Jumlah I + II Rp 34,537.50

6,10 1 bh pasang Doorcloser


6,10,1 Bahan
Door Closer 1.0000 bh X Rp 75,000.00 = Rp 75,000.00
Jumlah I = Rp 75,000.00
6,10.2 Tenaga
Pekerja 0.0500 OH X Rp 29,000.00 = Rp 1,450.00
Tukang kayu 0.5000 OH X Rp 32,500.00 = Rp 16,250.00
Kepala Tukang 0.0500 OH X Rp 35,000.00 = Rp 1,750.00
Mandor 0.0025 OH X Rp 35,000.00 = Rp 87.50
Jumlah I = Rp 19,537.50
Jumlah I + II Rp 94,537.50

1 bh pasang Spring Kneep


Bahan
Spring Kneep 1.0000 bh X Rp 25,000.00 = Rp 25,000.00
Jumlah I = Rp 25,000.00
Tenaga
Pekerja 0.0500 OH X Rp 29,000.00 = Rp 1,450.00
Tukang kayu 0.1500 OH X Rp 32,500.00 = Rp 4,875.00
Kepala Tukang 0.0500 OH X Rp 35,000.00 = Rp 1,750.00
Mandor 0.0025 OH X Rp 35,000.00 = Rp 87.50
Jumlah I = Rp 8,162.50
Jumlah I + II Rp 33,162.50

Pasang Stop Kontak 300 Watt/ Titik


Bahan
Stop kontak 1.0000 bh X Rp 50,000.00 = Rp 50,000.00
kabel NYM 10.0000 m1 X Rp 8,000.00 = Rp 80,000.00
pipa PVC 5/8" 2.0000 m1 X Rp 2,500.00 = Rp 5,000.00
Jumlah I = Rp 135,000.00
Tenaga
Pekerja 0.0000 OH X Rp 29,000.00 = Rp 0.00
Tukang listrik 0.1500 OH X Rp 32,500.00 = Rp 4,875.00
Kepala Tukang 0.0000 OH X Rp 35,000.00 = Rp 0.00
Mandor 0.0150 OH X Rp 35,000.00 = Rp 525.00
Jumlah I = Rp 5,400.00
Jumlah I + II Rp 140,400.00

1 bh Pasang lampu pijar 15 watt


Bahan
lampu pijar 15 watt 1.0000 bh X Rp 25,000.00 = Rp 25,000.00
Jumlah I = Rp 25,000.00
Tenaga
Pekerja 0.1000 OH X Rp 29,000.00 = Rp 2,900.00
Tukang listrik 0.2500 OH X Rp 32,500.00 = Rp 8,125.00
Kepala Tukang 0.0000 OH X Rp 35,000.00 = Rp 0.00
Mandor 0.0050 OH X Rp 35,000.00 = Rp 175.00
Jumlah I = Rp 11,200.00
Jumlah I + II Rp 36,200.00

1 bh Pasang lampu spot 125 watt


Bahan
lampu spot 125 watt 1.0000 bh X Rp 150,000.00 = Rp 150,000.00
Jumlah I = Rp 150,000.00
Tenaga
Pekerja 0.1000 OH X Rp 29,000.00 = Rp 2,900.00
Tukang listrik 0.2500 OH X Rp 32,500.00 = Rp 8,125.00
Kepala Tukang 0.0000 OH X Rp 35,000.00 = Rp 0.00
Mandor 0.0050 OH X Rp 35,000.00 = Rp 175.00
Jumlah I = Rp 11,200.00
Jumlah I + II Rp 161,200.00

1 bh Pasang lampu baret SL 4 X 18 Watt


Bahan
ampu baret SL 4 X 18 Watt 1.0000 bh X Rp 200,000.00 = Rp 200,000.00
Jumlah I = Rp 200,000.00
Tenaga
Pekerja 0.1000 OH X Rp 29,000.00 = Rp 2,900.00
Tukang listrik 0.2500 OH X Rp 32,500.00 = Rp 8,125.00
Kepala Tukang 0.0000 OH X Rp 35,000.00 = Rp 0.00
Mandor 0.0050 OH X Rp 35,000.00 = Rp 175.00
Jumlah I = Rp 11,200.00
Jumlah I + II Rp 211,200.00

1 bh Pasang lampu RM 2 x 18 watt


Bahan
lampu RM 2 x 18 watt + kisi - ki 1.0000 bh X Rp 125,000.00 = Rp 125,000.00
isolasi 0.5000 bh X Rp 3,500.00 = Rp 1,750.00
Jumlah I = Rp 126,750.00
Tenaga
Pekerja 0.1000 OH X Rp 29,000.00 = Rp 2,900.00
Tukang listrik 0.2500 OH X Rp 32,500.00 = Rp 8,125.00
Kepala Tukang 0.0000 OH X Rp 35,000.00 = Rp 0.00
Mandor 0.0050 OH X Rp 35,000.00 = Rp 175.00
Jumlah I = Rp 11,200.00
Jumlah I + II Rp 137,950.00

1 bh Pasang lampu TL RM 2 x 36 watt


Bahan
lampu RM 2 x 36 watt + kisi kisi 1.0000 bh X Rp 350,000.00 = Rp 350,000.00
isolasi 0.5000 bh X Rp 3,500.00 = Rp 1,750.00
Jumlah I = Rp 351,750.00
Tenaga
Pekerja 0.1000 OH X Rp 29,000.00 = Rp 2,900.00
Tukang listrik 0.2500 OH X Rp 32,500.00 = Rp 8,125.00
Kepala Tukang 0.0000 OH X Rp 35,000.00 = Rp 0.00
Mandor 0.0050 OH X Rp 35,000.00 = Rp 175.00
Jumlah I = Rp 11,200.00
Jumlah I + II Rp 362,950.00
1 bh Pasang lampu TL 2 x 36 watt
Bahan
lampu RM 2 x 36 watt + kisi kisi 1.0000 bh X Rp 250,000.00 = Rp 250,000.00
isolasi 0.5000 bh X Rp 3,500.00 = Rp 1,750.00
Jumlah I = Rp 251,750.00
Tenaga
Pekerja 0.1000 OH X Rp 29,000.00 = Rp 2,900.00
Tukang listrik 0.2500 OH X Rp 32,500.00 = Rp 8,125.00
Kepala Tukang 0.0000 OH X Rp 35,000.00 = Rp 0.00
Mandor 0.0050 OH X Rp 35,000.00 = Rp 175.00
Jumlah I = Rp 11,200.00
Jumlah I + II Rp 262,950.00

1 bh Pasang lampu TL 1 x 36 watt


Bahan
lampu TL x 36 watt + kisi kisi 1.0000 bh X Rp 150,000.00 = Rp 150,000.00
isolasi 0.5000 bh X Rp 3,500.00 = Rp 1,750.00
Jumlah I = Rp 151,750.00
Tenaga
Pekerja 0.1000 OH X Rp 29,000.00 = Rp 2,900.00
Tukang listrik 0.2500 OH X Rp 32,500.00 = Rp 8,125.00
Kepala Tukang 0.0000 OH X Rp 35,000.00 = Rp 0.00
Mandor 0.0050 OH X Rp 35,000.00 = Rp 175.00
Jumlah I = Rp 11,200.00
Jumlah I + II Rp 162,950.00

1 bh Pasang lampu TL 1 x 18 watt


Bahan
lampu TL x 18 watt + kisi kisi 1.0000 bh X Rp 110,000.00 = Rp 110,000.00
isolasi 0.5000 bh X Rp 3,500.00 = Rp 1,750.00
Jumlah I = Rp 111,750.00
Tenaga
Pekerja 0.1000 OH X Rp 29,000.00 = Rp 2,900.00
Tukang listrik 0.2500 OH X Rp 32,500.00 = Rp 8,125.00
Kepala Tukang 0.0000 OH X Rp 35,000.00 = Rp 0.00
Mandor 0.0050 OH X Rp 35,000.00 = Rp 175.00
Jumlah I = Rp 11,200.00
Jumlah I + II Rp 122,950.00

1 bh Pasang lampu Down Light 1 x 18 watt


Bahan
lampu Down Light 1 x 18 watt 1.0000 bh X Rp 120,000.00 = Rp 120,000.00
isolasi 0.5000 bh X Rp 3,500.00 = Rp 1,750.00
Jumlah I = Rp 121,750.00
Tenaga
Pekerja 0.1000 OH X Rp 29,000.00 = Rp 2,900.00
Tukang listrik 0.2500 OH X Rp 32,500.00 = Rp 8,125.00
Kepala Tukang 0.0000 OH X Rp 35,000.00 = Rp 0.00
Mandor 0.0050 OH X Rp 35,000.00 = Rp 175.00
Jumlah I = Rp 11,200.00
Jumlah I + II Rp 132,950.00
Pasang Stop Kontak
Bahan
Stop kontak 1.0000 bh X Rp 50,000.00 = Rp 50,000.00
Jumlah I = Rp 50,000.00
Tenaga
Pekerja 0.0000 OH X Rp 29,000.00 = Rp 0.00
Tukang listrik 0.1500 OH X Rp 32,500.00 = Rp 4,875.00
Kepala Tukang 0.0000 OH X Rp 35,000.00 = Rp 0.00
Mandor 0.0150 OH X Rp 35,000.00 = Rp 525.00
Jumlah I = Rp 5,400.00
Jumlah I + II Rp 55,400.00

Pasang Saklar Tunggal


Bahan
Saklar Tunggal 1.0000 bh X Rp 45,000.00 = Rp 45,000.00
Jumlah I = Rp 45,000.00
Tenaga
Pekerja 0.0000 OH X Rp 29,000.00 = Rp 0.00
Tukang listrik 0.1500 OH X Rp 32,500.00 = Rp 4,875.00
Kepala Tukang 0.0000 OH X Rp 35,000.00 = Rp 0.00
Mandor 0.0150 OH X Rp 35,000.00 = Rp 525.00
Jumlah I = Rp 5,400.00
Jumlah I + II Rp 50,400.00

Pasang Saklar Ganda


Bahan
Saklar Ganda 1.0000 bh X Rp 350,000.00 = Rp 350,000.00
Jumlah I = Rp 350,000.00
Tenaga
Pekerja 0.0000 OH X Rp 29,000.00 = Rp 0.00
Tukang listrik 0.1500 OH X Rp 32,500.00 = Rp 4,875.00
Kepala Tukang 0.0000 OH X Rp 35,000.00 = Rp 0.00
Mandor 0.0150 OH X Rp 35,000.00 = Rp 525.00
Jumlah I = Rp 5,400.00
Jumlah I + II Rp 355,400.00

1 bh Pasang AC Split 1 PK
Bahan
AC Split 1 PK 1.0000 Unit X Rp 2,500,000.00 = Rp 2,500,000.00
Alat Bantu 1.0000 Ls X Rp 65,000.00 = Rp 65,000.00
Dudukan 1.0000 Set X Rp 70,000.00 = Rp 70,000.00
Jumlah I = Rp 2,565,000.00
Tenaga
Pekerja 0.6000 OH X Rp 29,000.00 = Rp 17,400.00
Tukang listrik 1.2000 OH X Rp 32,500.00 = Rp 39,000.00
Tukang AC 2.0000 OH X Rp 32,500.00 = Rp 65,000.00
Mandor 0.4500 OH X Rp 35,000.00 = Rp 15,750.00
Jumlah I = Rp 137,150.00
Jumlah I + II Rp 2,702,150.00

1 bh Pasang AC Split 1 1/2 PK


Bahan
AC Split 1 1/2 PK 1.0000 Unit X Rp 3,500,000.00 = Rp 3,500,000.00
Alat Bantu 1.0000 Ls X Rp 65,000.00 = Rp 65,000.00
Dudukan 1.0000 Set X Rp 70,000.00 = Rp 70,000.00
Jumlah I = Rp 3,565,000.00
Tenaga
Pekerja 0.6000 OH X Rp 29,000.00 = Rp 17,400.00
Tukang listrik 1.2000 OH X Rp 32,500.00 = Rp 39,000.00
Tukang AC 2.0000 OH X Rp 32,500.00 = Rp 65,000.00
Mandor 0.4500 OH X Rp 35,000.00 = Rp 15,750.00
Jumlah I = Rp 137,150.00
Jumlah I + II Rp 3,702,150.00

1 bh Pasang AC Split 2 PK
Bahan
AC Split 2 PK 1.0000 Unit X Rp 4,500,000.00 = Rp 4,500,000.00
Alat Bantu 1.0000 Ls X Rp 65,000.00 = Rp 65,000.00
Dudukan 1.0000 Set X Rp 70,000.00 = Rp 70,000.00
Jumlah I = Rp 4,565,000.00
Tenaga
Pekerja 0.6000 OH X Rp 29,000.00 = Rp 17,400.00
Tukang listrik 1.2000 OH X Rp 32,500.00 = Rp 39,000.00
Tukang AC 2.0000 OH X Rp 32,500.00 = Rp 65,000.00
Mandor 0.4500 OH X Rp 35,000.00 = Rp 15,750.00
Jumlah I = Rp 137,150.00
Jumlah I + II Rp 4,702,150.00

1 bh Pasang Exhous van 60 w


Bahan
Exhous van 60 w 1.0000 Unit X Rp 250,000.00 = Rp 250,000.00
Alat Bantu 1.0000 Ls X Rp 65,000.00 = Rp 65,000.00
Dudukan 1.0000 Set X Rp 70,000.00 = Rp 70,000.00
Jumlah I = Rp 315,000.00
Tenaga
Pekerja 0.6000 OH X Rp 29,000.00 = Rp 17,400.00
Tukang listrik 1.2000 OH X Rp 32,500.00 = Rp 39,000.00
Tukang AC 2.0000 OH X Rp 32,500.00 = Rp 65,000.00
Mandor 0.4500 OH X Rp 35,000.00 = Rp 15,750.00
Jumlah I = Rp 137,150.00
Jumlah I + II Rp 452,150.00

-
-

-
-
DAFTAR HARGA SATUAN PEKERJAAN

KEGIATAN : PENINGKATAN SARANA DAN PRASARANA BP DIKJUR JAWA TENGAH


PEKERJAAN : PEMBANGUNAN AULA DAN RUANG MAKAN BP DIKJUR SATKER PATI
LOKASI : SIDOWUNGU, SIDOKERTO, KAB. PATI
TH ANGGARAN : 2010

HARGA SATUAN
NO U RAIAN P E K E R JAAN SAT
( RP. )

1 PLESTERAN SUDUT, SPONENGAN DAN TALI AIR M1 5,360.40


2 CAT DINDING INTERIOR M2 9,835.50
3 CAT DINDING EXSTERIOR M2 10,935.50
4 KUDA KUDA BAJA SIKU KG 110,000.00
5 PLESTERAN 1 : 5 (SAFT) M2 #REF!
6 LIS PLAFOND PROFIL GYPSUM M1 #REF!
7 PLESTERAN 1 : 3 t 15 mm M2 23,066.20
8 GALIAN TANAH PONDASI DAN FOOTPLAT M3 22,625.00
9 WATERPROFING ATAP M2 #REF!
10 PLESTERAN 1 : 3 (BETON) M2 #REF!
11 PLESTERAN 1 : 5 t 25 mm PONDASI BAWAH M2 #REF!
12 DAUN PINTU KREPYAK ALUMINIUM P3 M2 #REF!
13 PAS. BATU BATA 1 : 5 M2 56,716.00
14 BUBUNGAN GENTENG M1 44,435.00
15 PAS. BATU BATA 1 : 3 M2 62,924.00
16 PAPAN REUTER KAYU KRUING ( 2/20 ) CM M1 #REF!
17 PLAFON GYPSUM RK HOLLO M2 66,370.00
18 URUGAN TANAH PENINGGIAN PEIL M3 #REF!
19 PLAFOND KALSIBOARD RK HOLLO M2 62,037.50
20 KERAMIK DINDING 30/60 MOTIF ( LAVATORY) M2 #REF!
21 URUGAN PASIR URUG BAWAH FOOTPLAT M3 69,050.00
22 KACA BENING 5 mm J1 M2 #REF!
23 KERAMIK LANTAI KM 30/30 TEKSTUR M2 #REF!
24 PENUTUP ATAP GENTENG KERAMIK M2 51,495.00
25 USUK 5/7 + RENG 2/3 KAYU BENGKIRAI M2 #REF!
26 PAS. DAUN BOUVEN KACA ES 5mm RK. ALUMINIUM B1 M2 #REF!
27 KUSEN BOUVEN ALUMINIUM 4" B1 M1 #REF!
28 DAUN JENDELA KACA BENING 5 mm RK ALUMINIUM J2 M2 #REF!
29 BATU CANDI SERUT EXSTERIOR FINISHING COATING M2 #REF!
30 KERAMIK LANTAI 60/60 MOTIF M2 #REF!
31 GRANITO DINDING M2 #REF!
32 PASANGAN PONDASI BATU BELAH 1 : 4 M3 414,725.00
33 PASANGAN ROLAGG BATU BATA 1 : 3 M3 #REF!
34 BETON LANTAI KERJA 1 : 3 : 5 M3 569,533.48
35 BETON. KOLOM Kp STAGE 15 / 15 M3 #REF!
36 BETON BALOK BA5/LISTPLANK 1O / 60 M3 #REF!
37 BETON POOR/FOOTPLAT M3 1,771,060.00
38 BETON BALOK BP PRAKTIS 15 / 20 M3 #REF!
39 BETON SLOOF PRAKTIS 15 / 20 M3 #REF!
40 BETON MEJA WASTAVEL M3 #REF!
41 BETON SLOOF S2 20 / 30 M3 #REF!
42 BETON. KOLOM K2 30 / 50 M3 #REF!
43 BETON. KOLOM KI 30 / 50 M3 #REF!
44 BETON SLOOF S1 20 / 30 M3 1,945,620.60
45 BETON. KOLOM K3 30 / 30 M3 #REF!
46 BETON BALOK BA2 20 / 40 M3 #REF!
47 BETON BALOK BA6 20 / 25 M3 #REF!
48 BETON. KOLOM K5 15 / 30 M3 1,874,205.71
HARGA SATUAN
NO U RAIAN P E K E R JAAN SAT
( RP. )

49 BETON BALOK BA4 20 / 40 M3 #REF!


50 BETON BALOK BA3 20 / 40 M3 #REF!
51 BETON. KOLOM K2 30 / 50 M3 #REF!
52 BETON BALOK BA1 20 / 30 M3 #REF!
53 BETON. KOLOM K6 15 / 40 M3 #REF!
54 BETON. KOLOM KI 30 / 50 M3 2,136,614.18
55 BETON BALOK B4 25 / 50 M3 #REF!
56 BETON BALOK B3 25 / 50 M3 #REF!
57 BETON. KOLOM K4 30 / 30 M3 #REF!
59 BETON BALOK B1 25 / 50 M3 #REF!
60 BETON BALOK B5 20 / 50 M3 #REF!
61 BETON. KOLOM K3 30 /30 M3 1,874,205.71
62 BETON BALOK B6 20 / 30 M3 #REF!
63 BETON BALOK B2 25 / 50 M3 #REF!

0
0

0
0
HARGA SATUAN BAHAN DAN UPAH KERJA

PEKERJAAN : PEMBANGUNAN PERUMAHAN TYPE HARMONI


LOKASI : SALATIGA
TH ANGGARAN #REF!

No. Uraian Satuan Harga Bahan

A BAHAN PASANGAN DAN BETON


1 Batu belah 15/20 M3 85,000.00
2 Batu Bata Bh 400.00
3 Batu Krawang Bh 500.00
4 Batu Candi M2 90,000.00
5 Batu koral M2 110,000.00
6 Kerikil Cor 2/3 kg 105.87
7 Pasir Pasang M3 95,000.00
8 Pasir Beton/Cor kg 137.28
9 Air ltr 100.00

B BAHAN TIMBUNAN
1 Tanah Urug Biasa M3 30,000.00
2 Pasir Urug M3 50,000.00
3 Sirtu M3 60,000.00
C BAHAN SEMEN DAN KERAMIK
1 Semen PC 40 Kg Zak 48,000.00
2 Semen PC Kg 1,200.00
3 Semen Warna kg 5,000.00
4 Keramik 20 X 25 Motif M2 39,000.00
5 Keramik 20 X 25 Motif Bh 1,950.00
6 Keramik 30 x 30 Motif M2 41,000.00
7 Keramik 30 x 30 Motif Bh 3,690.00
8 Keramik 40 x 40 Motif M2 42,500.00
9 Keramik 40 x 40 Motif Bh 6,800.00
10 Granito 40 x 40 Bh 37,707.39
11 Keramik 20 X 25 Warna M2 39,000.00
12 Keramik 20 X 25 Warna Bh 1,950.00
13 Keramik 20 x 20 tekstur M2 39,000.00
14 Keramik 20 x 20 tekstur Bh 1,560.00
15 Keramik 20 x 20 putih M2 38,000.00
16 Keramik 20 x 20 putih Bh 1,520.00
17 Keramik 20 x 33 Warna M2 38,000.00
18 Keramik 20 x 33 Warna Bh 2,508.00
19 Keramik 30 x 30 tekstur M2 41,000.00
20 Keramik 30 x 30 tekstur Bh 3,690.00
21 Keramik 40 x 40 Warna M2 42,500.00
22 Keramik 40 x 40 Warna Bh 6,800.00
23 Keramik 60 x 60 Warna M2 80,000.00
24 Keramik 60 x 60 Warna Bh 28,800.00
25 Bordes list Motif 7 x 20 Bh 15,000.00
26 Nosing Tile keramik 7/10 Bh 7,500.00
27 List Motif 10 x 20 Bh 5,500.00
D BAHAN KAYU DAN PENUTUP
1 Kayu Bengkirai Klas Papan M3 4,500,000.00
2 Kayu Bengkirai Klas Balok M3 4,500,000.00
3 Kayu Kruing Balok M 3
2,000,000.00
4 Kayu Kruing Papan M3 2,000,000.00
5 Kayu Bekisting (Putih) M3 750,000.00
6 Kayu Buah/ Dolken Btg 9,000.00
7 Pliwood 9 mm lbr 110,000.00
8 Pliwood 6 mm lbr 80,000.00
9 Gypsum board lbr 50,000.00
10 list profil gypsum t 15 M' 12,500.00
11 list profil gypsum t 10 M' 10,000.00
12 Casting kg 15,000.00
13 Lis kayu 1/4 cm M' 2,500.00
14 Aluminium foil M2 8,000.00

E BAHAN ATAP DAN PAKU


1 Atap Spandek 0,30 M2 7,500.00
2 Paku 3,5 - 7 " ( Campur ) Kg 12,000.00
3 Baut Atap Kg 12,000.00
4 Baut dia 1/2" Bh 2,500.00
5 Baut dia 5/8" Bh 2,500.00
6 Atap Genteng Morando Glazur Jatiwangi Bh/lbr 3,000.00
7 Bubungan Genteng Morando Glazur Jatiwangi Bh/lbr 7,000.00
8 Galvalum M2 90,000.00

F BAHAN BESI , KACA DAN ALUMINIUM


1 Besi Beton Ulir Kg 8,100.00
2 Besi Beton Polos Kg 8,000.00
3 Kawat Beton ( Bendrat ) Kg 10,000.00
4 Kaca Bening 5 mm M2 75,000.00
5 Kaca Es 5 mm M2 85,000.00
6 Kaca warna 6 mm M 2
130,000.00
7 Kaca Bening 12 mm M2 175,000.00
8 Spandek galvalum 0,30 M2 7,500.00
9 Profil kaca M' 1,500.00
10 Sealent tube 25,000.00
11 Profil Aluminium 4" Silver M' 65,000.00
12 Canal C Hollo M' 5,000.00
13 Hollow 4/4 M' 5,000.00
14 Hollow galvanis 2/4 M' 5,000.00
15 Ram Aluminium 3/10 cm M' 5,000.00
16 Krepyak aluminium M2 25,000.00
17 Skrup Fixer Bh 250.00
18 Pipa Stainlesteel Ø 1/2" M' 7,000.00
19 Pipa Stainlesteel Ø 3/4" M' 8,000.00
20 Pipa Stainlesteel Ø 1" M' 10,000.00
21 Pipa Stainlesteel Ø 2" M' 20,000.00
22 Pipa StainlesteelØ 3" M' 45,000.00
23 Besi Galvanis hollo 2/4 cm M' 7,500.00

G BAHAN PENGUNCI DAN SANITAIR


1 Kunci Tanam 2 Slaag Bh 100,000.00
2 Grendel Jendela Bh 12,000.00
3 Engsel Pintu Bh 10,000.00
4 Engsel Jendela Bh 7,500.00
5 Grendel Pintu Bh 25,000.00
6 Hak Angin Bh 15,000.00
7 Door holder Bh 15,000.00
8 Door Closer Bh 75,000.00
9 Spring Kneep Bh 25,000.00
10 Pipa PVC type AW Ø 2" M' 18,750.00
11 Pipa PVC type AW Ø 3" M' 31,250.00
12 Pipa PVC type AW Ø 4" M' 37,500.00
13 Pipa PVC U 15 M' 20,000.00
14 Pipa PVC U 20 M' 22,500.00
22 Pipa gavanis 4" M' 100,000.00
23 Pipa gavanis 3" M' 83,333.33
24 Stop Kran hidrant Bh 50,000.00
25 Stop Kran 1/2" btg 35,000.00
26 Klosed Jongkok Bh 150,000.00
27 Klosed Duduk Monoblock Bh 1,250,000.00
28 Urinoir Bh 750,000.00
29 Wastavel Bh 1,000,000.00
30 Bak air fiberglass kap 0,3 m3 Bh 250,000.00
31 Kran Air Tanam 1/2" Bh 35,000.00
32 Floor Drain Bh 25,000.00

H BAHAN BESI
1 Pipa Gip 1,5" btg 500,000.00
2 Engsel besi bubut besar pcs 50,000.00
3 Plat besi 1,2mm lbr 75,000.00
4 Grendel besar pcs 25,000.00
5 Plat strip 1,6mm btg 12,500.00
6 Plat strip 3 mm btg 25,000.00
7 Plat strip 3 mm m1 4,166.67
8 Besi Siku kg 8,000.00
9 Mur/baut kg 8,000.00

I BAHAN INSTALASI LISTRIK


1 Lampu TL 40 Watt Bh 150,000.00
2 Lampu baret 4 x 18 Watt Bh 200,000.00
3 Lampu Pijar 25 Watt Bh 25,000.00
4 Lampu Spot 125 Watt Bh 150,000.00
5 Lampu RM TL 2 x 18 Watt Bh 125,000.00
6 Lampu TL 1 x 18 Watt Bh 110,000.00
7 Lampu TL RM 2 x 36 Watt + Kisi - Kisi Bh 350,000.00
8 Lampu TL 36 Watt Bh 150,000.00
9 Lampu TL 2 x 36 Watt Bh 250,000.00
10 Lampu Down Light 18 Watt Bh 120,000.00
11 Saklar Dobel Tempel ( Tanam NG ) Bh 350,000.00
12 Saklar Ganda Bh 50,000.00
13 Saklar Tunggal Bh 45,000.00
14 Stop Kontak ( Broco ) Bh 50,000.00
15 Box Sekring Otomat 2 Group ( Presto ) Bh 50,000.00
16 Pipa PVC 5/8" M' 2,500.00
17 Mcb 3 Group Bh 2,000,000.00
18 AC Panasonic 1 PK Bh 2,500,000.00
19 AC Panasonic 1 1/2 PK Bh 3,500,000.00
20 AC Panasonic 2 PK Bh 4,500,000.00
21 AC Panasonic 2 1/2 PK Bh 5,500,000.00
22 Exhaus van 60 w Bh 250,000.00
23 Panel SDP Bh 2,500,000.00
J BAHAN CAT DAN ALAT BANTU
1 Cat Tembok Warna penutup Kg 15,000.00
2 Cat Tembok Warna penutup mowilex Kg 25,000.00
3 Cat Tembok dasar Kg 15,000.00
4 Plamir dinding Kg 15,000.00
5 Cat Minyak penutup Kg 20,000.00
6 Cat Minyak dasar Kg 17,500.00
7 Cat antara Kg 17,500.00
8 Waterprofing Kg 25,000.00
9 Dempul Kayu Kg 12,500.00
10 Meni Kayu Kg 12,500.00
11 Thinner / Minyak Cat Klg 20,000.00
12 Minyak bekesting ltr 20,000.00
13 Politur ltr 20,000.00
14 Politur jadi ltr 20,000.00
15 Cat melamine kg 30,000.00
16 Cat Residu Ltr 15,000.00
17 Amplas Lbr 2,500.00
18 Lem kayu ltr 25,000.00

K UPAH KERJA

1 Pekerja H/O 29,000.00


2 Tukang Batu H/O 32,500.00
3 Kepala Tukang Batu H/O 35,000.00
4 Tukang Kayu H/O 32,500.00
5 Kepala Tukang kayu H/O 35,000.00
6 Tukang Besi H/O 32,500.00
7 Kepala Tukang Besi H/O 35,000.00
8 Tukang Listrik H/O 32,500.00
9 Kepala Tukang Listrik H/O 35,000.00
10 Tukang Pipa H/O 32,500.00
11 Kepala Tukang Pipa H/O 35,000.00
12 Tukang Besi Kontruksi H/O 32,500.00
13 Kepala Tukang Besi kontruksi H/O 35,000.00
14 Tukang cat H/O 32,500.00
15 Kepala Tukang cat H/O 35,000.00
16 Mandor H/O 35,000.00
17 Operator H/O 35,000.00
18 Pembantu operator H/O 32,500.00
19 Sopir H/O 32,500.00
20 Pembantu sopir H/O 29,000.00

0
0

0
0
PLAFOND
JLH PANJANG LEBAR JUMLAH LUAS

LT 1
GYPSUM A 1 1 3.000 2.500 1.00 7.500
3.830 2.500 1.00 9.575
4.500 4.000 1.00 16.000

CALSIBOARD A 1 1 1.500 1.500 1.00 2.250

LIS TEPI GYPSUM A 1 1 37.490 1.000 1.00 37.490

LIS TEPI KAYU PROFIL A 1 1 6.000 1.000 1.00 6.000

LT 2
GYPSUM A 1 1 3.000 2.500 1.00 7.500
3.830 3.000 1.00 11.490
4.500 4.000 1.00 16.000

CALSIBOARD A 1 1 1.500 1.500 1.00 2.250

LIS TEPI GYPSUM A 1 1 40.490 1.000 1.00 40.490

LIS TEPI KAYU PROFIL A 1 1 6.000 1.000 1.00 6.000


LUAS TOTAL

33.08

2.25

37.49

6.00

34.99

2.25

40.49

6.00
BACK UP DATA

KEGIATAN
PEKERJAAN
LOKASI
TH ANGGARAN

NO SKETSA URAIAN KODE SAT VOLUME SAT

LANTAI 1
LANTAI KERJA BETON TUMBUK & LANTAI KERJA 1 : 3 : 5
F1 ØFOOTPLAT F1 1x1 ARS 02
AS F1 = 14.00 ttk
F2 = - ttk
F3 = - ttk
14.00 ttk
J = 14.00 ttk
L = 1.00 m
P = 1.00 m
T = 0.05 m

V1 = (LxPxT)xJ V1 0.700 m³

TOTAL 0.700 m3

PASIR URUG BAWAH FOOTPLAT


F1 ØFOOTPLAT F1 1x1 ARS 02
AS F1 = 14.00 ttk
F2 = ttk
F3 = ttk
14.00 ttk
J = 14.00 ttk
L = 1.00 m
P = 1.00 m
T = 0.05 m

V1 = (LxPxT)xJ V1 0.700 m³

TOTAL 0.700 m3

FOOTPLAT F1 ØFOOTPLAT F1 1x1 ARS 02


AS F1 = 14.00 ttk
F2 = ttk
F3 = ttk
14.00 ttk
J = 14.00 ttk
V1 = (LxPxT)
L = 1.00 m
P = 1.00 m
T = 0.20 m

V1 = (LxPxT) V1 0.200 m³

V2 = ( La + Lb ) xT
2
La = 1.00 x 1.00 = 1.00 m²
Lb = 0.25 x 0.25 = 0.06 m²
T = 0.10

V2 = ( La + Lb ) xT V2 0.053 m³
2
V/ttk = ( V1 + V2 ) V/ ttk 0.253 m³
V total = ( Vttk x J ) V Total 3.544 m³

3.544 m3

SLOOF S1 ØSLOOF S1 L 0.2


T 0.3

Ptotal = 40.320 m¹
T = 0.300 m¹
L = 0.200 m¹
V Total = (TxL)xP Vtotal 2.419 m3

KOLOM K1 ØKOLOM K1 25x25


AS = 14.00 ttk
14.00 ttk + 0.00

J = 14.00 ttk
t = 3.30 m1
L = 0.25 m1
p = 0.25 m1

V / ttk = (LxP)xt V / ttk 0.206 m3


V Total = ( V/ ttk x j ) V Total 2.888 m3

K ØKOLOM K P 15 x L 15
praktis AS D = 3.00 ttk I = ttk
L1 H = ttk
3.00 ttk + 0.00 ttk

J = 3.00 ttk
t = 3.30 m1
L = 0.15 m1
p = 0.15 m1

V / ttk = (LxP)xt V / ttk 0.074 m3


V Total = ( V/ ttk x j ) V Total 0.223 m3

BALOK B1 ØBALOK B1 p 0.25


L 0.15
AS 1 = 3.83 m1 A = 4.5 m1
2 = 2.5 m1 B = 2.5 m1
3 = 3.83 m1 C = 4.4 m1
4 = 2.5 m1 D = 10.5 m1
5 = 7.66 m1 E = m1
6 = m1 F = m1

P total 20.32 m1 + 21.9 M1

P total = 42.22 m1
L = 0.15 m1
p = 0.25 m1
V total = ( p x L ) x Ptotal V total 1.583 m3

BETON BALOK LATEI (TOPI) ØBALOK LATEI 15 x 15


LANTAI 1 AS 1 = 8.00 m1 A = m1
10 = m1 D = m1
A¹ = m1 G’ = m1

P total 8.00 + 0.00

P total = 8.00
L = 0.15
P = 0.15
V total = ( P x L ) x Ptotal V total 0.180 m3

BETON BALOK LATEI (TOPI) ØBALOK LATEI 15 x 15


LANTAI 2 AS 1 = 7.83 m1 A = m1
10 = m1 D = m1
A¹ = m1 G’ = m1

P total 7.83 + 0.00

P total = 7.83
L = 0.15
P = 0.15
V total = ( P x L ) x Ptotal V total 0.176 m3

BETON BALOK LATEI ØBALOK LATEI 15 x 25 (GUNUNGAN)


AS 1 = 7.60 m1 A = m1
= m1 D = m1
= m1 G’ = m1

P total 7.60 + 0.00

P total = 7.60 JML 1


L = 0.15
P = 0.25
V total = ( P x L ) x Ptotal V total 0.285 m3

RINGBALK RB RINGBALK L 0.15


P 0.25

Ptotal = 43.820 m¹
P = 0.250 m¹
L = 0.150 m¹
V Total = ( P x L ) x Ptotal Vtotal 1.6433 m3

BETON TANGGA ØSLOOF L 20 x T 40

P = 1.000 m¹
T = 0.300 m¹
L = 0.200 m¹
1 V Total = (TxL)xP Vtotal 0.060 m3

ØBALOK TANGGA L 20 x T 40

P = 1.000 m¹
T = 0.400 m¹
L = 0.200 m¹
2 V Total = (TxL)xP Vtotal 0.080 m3

ØPLAT BORDES 20 CM

P = 1.000 m¹
T = 0.150 m¹
L = 1.380 m¹
3 V Total = (TxL)xP Vtotal 0.207 m3

ØPLAT T 20 CM

P = 8.000 m¹
T = 0.150 m¹
L = 1.250 m¹
V = (TxL)xP V 1.500 m3

ØANAK TANGGA 20 BH

P = 0.300 m¹
T = 0.150 m¹
L = 1.000 m¹
V = (TxL)xP V 0.450 m3
2

ØFOOTPLAT

P = 1.250 m¹
T = 0.800 m¹
t = 0.250 m¹
V = (TxL)xP V 0.250 m3

P = 1.250 m¹
T = 0.700 m¹
t = 0.200 m¹
V = (TxL)xP V 0.175 m3

4 V Total = Vtotal 2.722 m3

V Total BETON TANGGA


V Total = (1+2 ) Vtotal 2.722 m3

PLAT LT 2 ØPLAT LANTAI 2 Tebal 12 cm

L1 = 3.830 x 3.00 = 11.490 m2


L2 = 2.500 3.00 7.500 m2
L3 = 4.000 x 4.50 = 18.000 m2
L4 = 1.500 1.50 2.250
L5 = (1.000) 5.00 -5.000

34.240 m2
LS 0.00 34.24 m2

L total = ( LS x t )
= 34.24 m2
T = 0.12 m

V total = ( L total x T ) V total 4.109

BALOK 1 42.22 0.823

TOTAL 3.286 M3

PLAT LEUVEL LT 1 ØPLAT LEVEL Tebal 7 cm


TP 1
L1 = 1.500 x 2.50 = 3.750 m2
L2 = 0.600 x = 0.000 m2

3.750 m2
LS 0.00 3.75 m2

L total = ( LS x t )
= 3.75 m2
T = 0.07 m

V total = ( L total x T ) V total 0.263 0

TP 2
L1 = 0.600 x 2.90 = 1.740 m2
L2 = 0.600 x = 0.000 m2
L3 = 0.600 x = 0.000 m2
L4 = 0.600 x = 0.000 m2
1.740 m2
LS 0.00 1.74 m2

L total = ( LS x t )
= 1.74 m2
T = 0.07 m

V total = ( L total x T ) V total 0.122 0

T0TAL 0.384 M3

LANTAI 2 1.44

Kp ØKOLOM Kp P 15 x L 15
AS 2/3 = 15.00 ttk
15.00 ttk +

J = 15.00 ttk
t = 3.30 m1
L = 0.15 m1
p = 0.15 m1

V / ttk = (LxP)xt V / ttk 0.074 m3


V Total = ( V/ ttk x j ) V Total 1.114 m3
8

602.2
BACK UP PERHITUNGAN BAJA

BAJA L
TIPE JUMLAH L 12 L70 L50 C 125.50.2,3 PLAT 10 MM PLAT 8 MM VOL TOTAL SAT angkur buhul
21.67 7.38 3.75 4.52 80.9 64.9
Jumlah TL Ptotal Jumlah TL Ptotal Jumlah TL Ptotal

KUDA2 KD1 2,598.00 324.75


7.00 4.00 8.66 4 7.85 4.00 11.45 8,078.92 KG 952.00 182.00

KUDA JL 1
4.00 2.00 11.46 2 10.86 2.00 13.69 3,038.58 KG 544.00 52.00

KUDA JL 2
2.00 4 7.13 2.00 8.38 546.66 KG 168.00 18.00

KUDA2 KD2
2.00 4 16.17 4.00 12.72 1,336.28 KG 592.00 56.00

KUDA2 KD3 2.88


2.00 4 15.39 4.00 9.78 1,202.03 KG 208.00 56.00 80.9027777778

KUDA2 KD4
2.00 2.00 8.66 2 7.85 2.00 12.25 1,166.13 KG 52.00 24.00

KUDA2 KD5
1.00 2 21.31 2.00 10.72 394.94 KG 26.00 19.00

KUDA2 MEMANJANG
1.00 2 30.00 2.00 28.32 655.20 KG 56.00 18.00

KUDA2 6
4.00 2 11.01 2.00 5.89 826.73 KG 56.00 36.00
50,313.62
KUDA2 7 905,645,102.40
4.00 2 5.49 2.00 2.27 392.23 KG 56.00 24.00 202,145,444.80
67,704,000.00
KUDA2 8
1.00 2 21.48 4.00 6.60 416.04 KG 56.00 22.00

18,053.72 507.00

GORDING ###
C 125.50.2,3 1,203.90 5,441.63 KG

GORDING JL1
C 125.50.2,3 91.68 414.39 KG
92.80
GORDING JL2 136.10
C 125.50.2,3 30.56 138.13 KG 172.40
401.30
GORDING JD 601.95
C 125.50.2,3 30.56 138.13 KG 1,203.90
1,356.70 6,132.28
PIPA Ø 3"
37.00 - M1

PLAT LANDAS
10 MM 3.72 300.95 KG

PLAT BUHUL
10 MM 20.28 1,640.65 KG

PLAT L DUDUKAN 182


60.00 - 225.00 KG

ANGKUR Ø 16
p 40 cm 117.60 - 185.81 KG

MUR BAUT
2,598.00 - 324.75 KG
51,049.17
KAIT ANGIN
DIA 16 MM - 537.20 KG

TRACKSTANG
DIA 10 MM - 175.09 KG

GRIIL BESI
71.12 - 266.70 KG
14.40 54.00 816,786,796.80
320.70
106.68 66.14
711.20 440.94

RAILLING 3" 22.80


11.60
34.40
2" 20.00
1" 19.60
50.40
70.00

RAILLING TANGGA 3" 15.20


9.00
48.40
2" 31.20
1" 76.32

507.09
GENTENG
642.67 M2 64,266,600.00

USUK / RENG
642.67 M2 57,197,274.00

ALUMINIUM FOIL
642.67 M2 5,783,994.00
944,034,664.80 96,399,900.00

546,266,100.00

42239.7328
675835724.8

644.8
77,376,000.00
61,900,800.00
4,836,000.00
58,032,000.00
202,145,444.80
67,704,000.00

480
336,000,000.00

31.50
16.50
223.20
143.55
223.20
52.72
642.67
3.65

Plat leufel

2.22
BACK UP PERHITUNGAN PEMBESIAN
GEDUNG AULA 6361.32
4.716
LT 1
TULANGAN JML. BEGEL BERAT BERAT BERAT
TIPE PANJANG/m3 D.22 D.19 D.16 D.13 Ø 12 Ø 10 O.8 O.10 0.6 TL POKOK TL BEUGEL KG/M3 RERATA OVERSTEK BOBOT/TL BOBOT TOTAL
2.983 2.222 1.578 1.04 0.887 0.62 0.393 0.62 0.22 KG KG KG/M3 10% Kg/m3 Kg/m3
Jumlah TL Ptotal Jumlah TL Ptotal Jumlah TL Ptotal Jumlah TL Ptotal J/m1 P/Beugel Ptotal J/m1 P/Beugel Ptotal J/m1 P/Beugel Ptotal

Sloof S1 20/30
TUMPUAN 16.67 6 50.00 6.30 1.10 57.75 78.90 22.70 101.60 203.19
LAPANGAN 16.67 6 50.00 6.30 1.10 57.75 78.90 22.70 101.60
BESI ULIR 157.80 157.80 203.19
BESI POLOS 45.39 45.39
- - - -
Sloof S2 20/30
TUMPUAN 16.67 4 33.33 5.00 1.10 45.83 52.60 18.01 70.61 145.91
LAPANGAN 16.67 4 33.33 6.30 1.10 57.75 52.60 22.70 75.30
BESI ULIR 105.20 10.52 115.72 156.43
BESI POLOS 40.71 40.71

Sloof TG 20/40
TUMPUAN 12.50 7 43.75 10.00 1.10 68.75 69.04 27.02 96.06 182.12
LAPANGAN 12.50 7 43.75 6.30 1.10 43.31 69.04 17.02 86.06
BESI ULIR 138.08 13.81 151.88 195.92
BESI POLOS 44.04 44.04

Kolom K0 20/60
8.33 6 50.00 6.30 1.50 78.75 78.90 30.95 109.85 109.85
BESI ULIR 78.90 78.90 109.85
BESI POLOS 30.95 30.95

Kolom K1 50/30
6.67 12 80.00 6.30 1.60 67.20 126.24 26.41 152.65 152.65
BESI ULIR 126.24 12.62 138.86 165.27
BESI POLOS 26.41 26.41

Kolom K2 50/30
6.67 10 66.67 6.30 1.60 67.20 105.20 26.41 131.61 131.61
BESI ULIR 105.20 10.52 115.72 142.13
BESI POLOS 26.41 26.41

Kolom K3 30/30
11.11 8 88.89 6.30 1.20 84.00 140.27 33.01 173.28 173.28
BESI ULIR 140.27 14.03 154.29 187.31
BESI POLOS 33.01 33.01

Kolom K4 30/30
11.11 8 88.89 6.30 1.20 84.00 92.44 33.01 125.46 125.46
BESI ULIR 92.44 9.24 101.69 134.70
BESI POLOS 33.01 33.01

Kolom Kp 15/15
44.44 4.00 177.78 6.30 0.52 145.60 110.22 32.03 142.25 142.25 142.25 142.25
BESI ULIR - 142.25
BESI POLOS 110.22 32.03 142.25

Balok B1 25/50
TUMPUAN 8.00 9 36.00 2 8.00 10.00 1.50 60.00 87.09 37.20 124.29 199.00
LAPANGAN 8.00 7 28.00 2 8.00 6.30 1.50 37.80 51.28 23.44 74.72
BESI ULIR 138.37 13.84 152.20 212.84
BESI POLOS 60.64 60.64

Balok B2 25/50
TUMPUAN 8.00 12.00 48 2.00 8.00 10.00 2.70 108.00 113.75 66.96 180.71 296.11
LAPANGAN 8.00 8.00 32 2.00 8.00 10.00 1.50 60.00 78.20 37.20 115.40
BESI ULIR 191.95 19.20 211.15 315.31
BESI POLOS 104.16 104.16

Balok B3 25/50
TUMPUAN 8.00 6 24.00 2.00 8.00 10.00 1.50 60.00 60.42 37.20 97.62 181.48
LAPANGAN 8.00 6 24.00 2.00 8.00 6.30 1.50 37.80 60.42 23.44 83.86
BESI ULIR 120.85 12.08 132.93 193.57
BESI POLOS 60.64 60.64

Balok B4 25/50
TUMPUAN 8.00 5 20.00 2.00 8.00 10.00 1.50 60.00 51.54 37.20 88.74 163.71
LAPANGAN 8.00 5 20.00 2.00 8.00 6.30 1.50 37.80 51.54 23.44 74.97
BESI ULIR 103.07 10.31 113.38 174.02
BESI POLOS 60.64 60.64

Balok B5 20/50
TUMPUAN 10.00 5 25.00 2.00 10.00 10.00 1.50 75.00 64.42 29.48 93.90 176.88
LAPANGAN 10.00 5 25.00 2.00 10.00 6.30 1.50 47.25 64.42 18.57 82.99
BESI ULIR 128.84 12.88 141.72 189.77
BESI POLOS 48.04 48.04

Balok B6 20/30
TUMPUAN 16.67 4 33.33 10.00 1.20 100.00 52.60 39.30 91.90 169.26
LAPANGAN 16.67 4 33.33 6.30 1.20 63.00 52.60 24.76 77.36
BESI ULIR 105.20 10.52 115.72 179.78
BESI POLOS 64.06 64.06

Plat LT t = 12 cm
T Melintang 8.33 3.30 68.75 42.63 - 42.63 85.25 85.25 85.25
Tmemanjang 8.33 3.30 68.75 42.63 - 42.63

KONSOL/BORDES

BA 6 20/25
TUMPUAN 16.67 5 41.67 10.00 0.90 75.00 65.75 29.48 95.23 177.30 17.73 195.03 212.76
LAPANGAN 16.67 4 33.33 10.00 0.90 75.00 52.60 29.48 82.08

BR1 20/40
TUMPUAN 12.50 6 37.50 2.00 12.50 10.00 1.20 75.00 70.26 29.48 99.74 188.57 18.86 207.43 226.28
LAPANGAN 12.50 6 37.50 2.00 12.50 6.30 1.20 47.25 70.26 18.57 88.83

Balok BORDES 20/40


TUMPUAN 12.50 6 37.50 10.00 1.20 75.00 59.18 29.48 88.65 166.39 16.64 183.03 199.67
LAPANGAN 12.50 6 37.50 6.30 1.20 47.25 59.18 18.57 77.74

BALOK ATAP

Balok BA1 20/30


TUMPUAN 16.67 5 41.67 2.00 16.67 6.50 1.00 54.17 80.53 21.29 101.82 198.73 19.87 218.60 238.48
LAPANGAN 16.67 5 41.67 2.00 16.67 5.00 1.00 41.67 80.53 16.38 96.91

Balok BA2 20/40


TUMPUAN 12.50 5 31.25 2.00 12.50 10.00 1.20 75.00 60.40 29.48 89.88 168.84 16.88 185.73 202.61
LAPANGAN 12.50 5 31.25 2.00 12.50 6.30 1.20 47.25 60.40 18.57 78.97

Balok BA3 20/40


TUMPUAN 12.50 6 37.50 2.00 12.50 10.00 1.20 75.00 70.26 29.48 99.74 188.57 18.86 207.43 226.28
LAPANGAN 12.50 6 37.50 2.00 12.50 6.30 1.20 47.25 70.26 18.57 88.83

Balok BA4 20/40


TUMPUAN 16.67 5 41.67 10.00 0.95 79.17 65.75 31.11 96.86 182.21 18.22 200.43 218.66
LAPANGAN 16.67 5 41.67 6.30 0.95 49.88 65.75 19.60 85.35

Balok B5 20/40
TUMPUAN 12.50 6 37.50 10.00 1.15 71.88 59.18 28.25 87.42 144.67 14.47 159.13 173.60
LAPANGAN 12.50 4 25.00 6.30 1.15 45.28 39.45 17.80 57.25

Balok B6 15/30
TUMPUAN 22.22 4 44.44 6.30 0.85 59.50 70.13 23.38 93.52 182.21 18.22 200.43 218.65
LAPANGAN 22.22 4 44.44 5.00 0.85 47.22 70.13 18.56 88.69

Balok B7 15/25
TUMPUAN 26.67 4 53.33 6.30 0.85 71.40 84.16 28.06 112.22 218.65 21.87 240.52 262.38
LAPANGAN 26.67 4 53.33 5.00 0.85 56.67 84.16 22.27 106.43

TOP ROOF PLAT

Plat LT t = 10 cm
T Melintang 10.00 10.00 100.00 39.30 #REF! #REF! #REF! #REF! #REF!
Tmemanjang 10.00 10.00 100.00 39.30 #REF! #REF!

0.43
0.54
BACK UP PERHITUNGAN PEMBESIAN
GEDUNG AULA
LT 1
TULANGAN JML. BEGEL BERAT BERAT BERAT
TIPE PANJANG/m3 D.22 D.19 D.16 D.13 Ø 12 Ø 10 O.8 O.10 0.6 TL POKOK TL BEUGEL KG/M3 RERATA OVERSTEK BOBOT/TL BOBOT TOTAL
2.983 2.222 1.578 1.04 0.887 0.62 0.393 0.62 0.22 KG KG KG/M3 10% Kg/m3 Kg/m3
Jumlah TL Ptotal Jumlah TL Ptotal Jumlah TL Ptotal Jumlah TL Ptotal J/m1 P/Beugel Ptotal J/m1 P/Beugel Ptotal J/m1 P/Beugel Ptotal

Sloof S1 20/30
TUMPUAN 16.67 6 50.00 6.30 0.90 47.25 78.90 18.57 97.47 194.94
LAPANGAN 16.67 6 50.00 6.30 0.90 47.25 78.90 18.57 97.47
BESI ULIR 157.80 157.80 194.94
BESI POLOS 37.14 37.14
- - - -
Sloof S2 20/30
TUMPUAN 16.67 4 33.33 5.00 0.90 37.50 52.60 14.74 67.34 138.51
LAPANGAN 16.67 4 33.33 6.30 0.90 47.25 52.60 18.57 71.17
BESI ULIR 105.20 10.52 115.72 149.03
BESI POLOS 33.31 33.31

Sloof TG 20/40
TUMPUAN 12.50 7 43.75 10.00 0.90 56.25 69.04 22.11 91.14 174.11
LAPANGAN 12.50 7 43.75 6.30 0.90 35.44 69.04 13.93 82.96
BESI ULIR 138.08 13.81 151.88 187.92
BESI POLOS 36.03 36.03

Kolom K0 20/60
8.33 6 50.00 6.30 1.50 78.75 78.90 30.95 109.85 109.85
BESI ULIR 78.90 78.90 109.85
BESI POLOS 30.95 30.95

Kolom K1 50/30
6.67 12 80.00 6.30 1.60 67.20 126.24 26.41 152.65 152.65
BESI ULIR 126.24 12.62 138.86 165.27
BESI POLOS 26.41 26.41

Kolom K2 50/30
6.67 10 66.67 6.30 1.60 67.20 105.20 26.41 131.61 131.61
BESI ULIR 105.20 10.52 115.72 142.13
BESI POLOS 26.41 26.41

Kolom K3 30/30
11.11 8 88.89 6.30 1.20 84.00 140.27 33.01 173.28 173.28
BESI ULIR 140.27 14.03 154.29 187.31
BESI POLOS 33.01 33.01

Kolom K4 30/30
11.11 8 88.89 6.30 1.20 84.00 92.44 33.01 125.46 125.46
BESI ULIR 92.44 9.24 101.69 134.70
BESI POLOS 33.01 33.01

Kolom K5 15/30
22.22 6.00 133.33 10.00 0.90 200.00 82.67 78.60 161.27 161.27
BESI ULIR 82.67 8.27 90.93 169.53
BESI POLOS 78.60 78.60

Kolom K6 15/40
16.67 4 66.67 2.00 33.33 6.30 1.10 115.50 134.77 45.39 180.16 180.16
BESI ULIR 134.77 13.48 148.24 193.63
BESI POLOS 45.39 45.39

Kolom Kp 15/15
44.44 4.00 177.78 6.30 0.52 145.60 110.22 32.03 142.25 142.25 142.25 142.25
BESI ULIR - 142.25
BESI POLOS 110.22 32.03 142.25

Balok B1 25/50
TUMPUAN 8.00 9 36.00 2 8.00 10.00 1.50 60.00 87.09 37.20 124.29 199.00
LAPANGAN 8.00 7 28.00 2 8.00 6.30 1.50 37.80 51.28 23.44 74.72
BESI ULIR 138.37 13.84 152.20 212.84
BESI POLOS 60.64 60.64

Balok B2 25/50
TUMPUAN 8.00 12.00 48 2.00 8.00 10.00 2.70 108.00 113.75 66.96 180.71 296.11
LAPANGAN 8.00 8.00 32 2.00 8.00 10.00 1.50 60.00 78.20 37.20 115.40
BESI ULIR 191.95 19.20 211.15 315.31
BESI POLOS 104.16 104.16

Balok B3 25/50
TUMPUAN 8.00 6 24.00 2.00 8.00 10.00 1.50 60.00 60.42 37.20 97.62 181.48
LAPANGAN 8.00 6 24.00 2.00 8.00 6.30 1.50 37.80 60.42 23.44 83.86
BESI ULIR 120.85 12.08 132.93 193.57
BESI POLOS 60.64 60.64

Balok B4 25/50
TUMPUAN 8.00 5 20.00 2.00 8.00 10.00 1.50 60.00 51.54 37.20 88.74 163.71
LAPANGAN 8.00 5 20.00 2.00 8.00 6.30 1.50 37.80 51.54 23.44 74.97
BESI ULIR 103.07 10.31 113.38 174.02
BESI POLOS 60.64 60.64

Balok B5 20/50
TUMPUAN 10.00 5 25.00 2.00 10.00 10.00 1.50 75.00 64.42 29.48 93.90 176.88
LAPANGAN 10.00 5 25.00 2.00 10.00 6.30 1.50 47.25 64.42 18.57 82.99
BESI ULIR 128.84 12.88 141.72 189.77
BESI POLOS 48.04 48.04

Balok B6 20/30
TUMPUAN 16.67 4 33.33 10.00 1.20 100.00 52.60 39.30 91.90 169.26
LAPANGAN 16.67 4 33.33 6.30 1.20 63.00 52.60 24.76 77.36
BESI ULIR 105.20 10.52 115.72 179.78
BESI POLOS 64.06 64.06

Plat LT t = 12 cm
T Melintang 8.33 3.30 68.75 42.63 - 42.63 85.25 85.25 85.25
Tmemanjang 8.33 3.30 68.75 42.63 - 42.63

KONSOL/BORDES

BA 6 20/25
TUMPUAN 16.67 5 41.67 10.00 0.90 75.00 65.75 29.48 95.23 177.30 17.73 195.03 212.76
LAPANGAN 16.67 4 33.33 10.00 0.90 75.00 52.60 29.48 82.08

BR1 20/40
TUMPUAN 12.50 6 37.50 2.00 12.50 10.00 1.20 75.00 70.26 29.48 99.74 188.57 18.86 207.43 226.28
LAPANGAN 12.50 6 37.50 2.00 12.50 6.30 1.20 47.25 70.26 18.57 88.83

Balok BORDES 20/40


TUMPUAN 12.50 6 37.50 10.00 1.20 75.00 59.18 29.48 88.65 166.39 16.64 183.03 199.67
LAPANGAN 12.50 6 37.50 6.30 1.20 47.25 59.18 18.57 77.74

BALOK ATAP

Balok BA1 20/30


TUMPUAN 16.67 5 41.67 2.00 16.67 6.50 1.00 54.17 80.53 21.29 101.82 198.73 19.87 218.60 238.48
LAPANGAN 16.67 5 41.67 2.00 16.67 5.00 1.00 41.67 80.53 16.38 96.91

Balok BA2 20/40


TUMPUAN 12.50 5 31.25 2.00 12.50 10.00 1.20 75.00 60.40 29.48 89.88 168.84 16.88 185.73 202.61
LAPANGAN 12.50 5 31.25 2.00 12.50 6.30 1.20 47.25 60.40 18.57 78.97

Balok BA3 20/40


TUMPUAN 12.50 6 37.50 2.00 12.50 10.00 1.20 75.00 70.26 29.48 99.74 188.57 18.86 207.43 226.28
LAPANGAN 12.50 6 37.50 2.00 12.50 6.30 1.20 47.25 70.26 18.57 88.83

Balok BA4 20/40


TUMPUAN 16.67 5 41.67 10.00 0.95 79.17 65.75 31.11 96.86 182.21 18.22 200.43 218.66
LAPANGAN 16.67 5 41.67 6.30 0.95 49.88 65.75 19.60 85.35
KACA MATI
JLH TINGGI LEBAR JUMLAH LUAS

LT 1 -
POLOS KACA MATI P4 1.000 0.400 1.600 1.00 0.640
-
P0LOS KACA MATI j1 6.000 1.950 0.850 1.00 9.945

POL KACA MATI j2 4.000 1.950 0.850 2.00 13.260

POLOS KACA MATI j3 1.000 2.000 0.600 4.00 4.800

POLOS KACA MATI j4 2.000 1.950 0.750 1.00 2.925

POLOS KACA MATI jp 6.000 5.400 0.400 1.00 12.960

WARNA KACA MATI js 2.000 0.700 0.700 6.00 5.880


2.000 0.700 1.790 6.00 15.036
2.000 0.700 0.550 6.00 4.620
TOTAL 70.066

JLH TINGGI LEBAR JUMLAH LUAS

LT 2 -
POLOS KACA MATI
-
P0LOS KACA MATI j1 6.000 1.950 0.850 1.00 9.945

POL KACA MATI j2 4.000 1.950 0.850 2.00 13.260

POLOS KACA MATI JA 6.000 1.400 0.850 1.00 7.140

POLOS KACA MATI JB 1.000 1.400 1.500 2.00 4.200

POLOS KACA MATI JN 2.000 1.400 1.400 1.00 3.920

TOTAL 38.465
25.536
KERAMIK
JLH PANJANG LEBAR JUMLAH LUAS

LT 1
PARQUET 1 1.000 2.800 2.600 7.280
(L1) 1.000 1.000 0.750 0.750
2 1.000 2.800 2.600 7.280
1.000 1.000 0.800 0.800
3/4 2.000 2.800 2.000 11.200
2.000 1.000 0.750 1.500
5/6 2.000 2.800 2.000 11.200
7/8 2.000 3.500 2.000 14.000
2.000 0.750 1.000 1.500
9 1.000 2.500 2.000 5.000
1.000 0.750 1.000 0.750
10 1.000 2.500 2.000 5.000
11 1.000 3.500 2.000 7.000

KERAMIK 30/30 SLIP 1 4.000 2.800 1.000 11.200


L2 2 2.000 3.800 1.000 7.600
3 1.000 2.000 2.000 4.000
4 1.000 2.000 3.500 7.000
5 2.000 3.500 1.000 7.000
6 1.000 3.000 2.000 6.000
7 1.000 2.500 1.000 2.500
8 2.000 3.500 1.000 7.000
9 1.000 4.500 1.000 4.500

KERAMIK 20/20 NON SLIP 1 11.000 1.000 2.250 24.750


L3 2 1.000 1.000 2.500 2.500

KERAMIK 30/30 NON SLIP 1 2.000 0.600 9.640 11.568


L4 2 1.000 1.000 8.000 8.000
3 1.000 1.500 4.400 6.600

PAVING BLOCK 1 1.000 1.000 12.500 12.500


L5 2 1.000 2.400 2.250 5.400
3 1.000 3.250 5.600 18.200
4 1.000 2.000 4.600 9.200
5 1.000 2.040 9.000 18.360

KERAMIK 40/40 TANGGA 1 1.000 10.000 1.500 15.000


2 2.000 4.000 1.500
LIS
TANGGA 1.000 1.400 10.000 14.000
1.000 1.400 10.000 14.000
LT 2
-
PARQUET 1 1.000 2.800 2.600 7.280
(L1) 1.000 1.000 0.750 0.750
2 1.000 2.800 2.600 7.280
1.000 1.000 0.800 0.800
3/4 2.000 2.800 2.000 11.200
2.000 1.000 0.750 1.500
5/6 2.000 2.800 2.000 11.200
LUAS TOTAL

73.260

56.800

27.25

26.17

63.66

INI BELUM !!!!!!!


partisy
JLH TINGGI/P LEBAR JUMLAH LUAS LUAS TOTAL

LT 1
-
PRTSY TP1 TP 1 1.000 3.000 3.600 10.800 10.800
PRTSY TP2 TP 2 1.000 3.000 3.600 10.800 10.800
PRTSY TP3 TP3 1.000 3.000 3.850 11.550 11.550
LT 2
-
PRTSY TP1 TP 1 3.000 3.000 3.600 32.400 32.400
PRTSY TP4 TP 4 5.000 3.000 1.400 21.000
5.000 0.400 1.700 3.400 24.400
PRTSY TP5 TP 5 1.000 3.000 3.720 11.160
PINTU 1.000 1.800 1.450 2.610
1.000 0.800 0.800 0.640 -
7.91

TP 6 1.000 3.000 3.100 9.300


JENDELA 1.000 1.800 2.600 4.680
1.000 - - - -
4.62
DAUN PINTU,JENDELA,BOUVEN
LT I JLH TINGGI LEBAR JUMLAH LUAS

KACA 12 MM DAUN PINTU P1 3.000 2.100 2.000 12.600


-
MULTIPLEK DAUN PINTU P2 2.000 2.100 0.900 3.780
-
MULTIPLEK DAUN PINTU P4 1.000 2.100 1.600 3.360
-
MULTIPLEK DAUN PINTU PB 2.000 1.880 0.900 3.384
-
ALUMINIUM DAUN PINTU P3 3.000 2.100 0.700 4.410

ALUMINIUM DAUN PINTU PS 12.000 0.600 0.800 5.760

POLOS DAUN JENDELA J2 4.000 1.950 0.800 2.00 12.480

ES DAUN BOUVEN B1 1.000 0.400 0.600 1.00 0.240


-
ES DAUN BOUVEN B2 4.000 0.400 0.600 2.00 1.920

LT 2 JLH TINGGI LEBAR JUMLAH LUAS

KACA 12 MM DAUN PINTU P1 2.000 2.100 2.000 8.400


-
MULTIPLEK DAUN PINTU P2 3.000 2.100 0.900 5.670
-
ALUMINIUM DAUN PINTU P3 8.000 2.100 0.700 11.760

ALUMINIUM DAUN PINTU PS 12.000 0.600 0.800 5.760

POLOS DAUN JENDELA J2 4.000 1.950 0.800 2.00 12.480

ES DAUN BOUVEN B1 2.000 0.400 0.600 1.00 0.480


-
ES DAUN BOUVEN B2 4.000 0.400 0.600 2.00 1.920

LT 2 JLH TINGGI LEBAR JUMLAH LUAS

MULTIPLEK DAUN PINTU P2 5.000 2.100 1.600 16.800


-
MULTIPLEK DAUN PINTU P3 2.000 2.100 1.500 6.300
-
MULTIPLEK DAUN PINTU P4 4.000 2.100 0.700 5.880
-
KACA AL POL DAUN PINTU P6 1.000 2.100 1.600 3.360
-
MULTIPLEK DAUN PINTU PJ2 1.000 2.100 0.700 1.470

WARNA DAUN JENDELA J1 14.000 1.250 0.800 2.00 28.000


-
POLOS DAUN JENDELA J2 1.000 1.250 0.800 2.00 2.000

WARNA DAUN JENDELA J3 1.000 1.200 0.700 1.00 0.840

POLOS DAUN JENDELA J6 4.000 3.130 1.030 1.00 12.896

WARNA DAUN JENDELA JP 2.000 1.200 0.680 2.00 3.264

POLOS DAUN JENDELA PJ2 1.000 1.250 0.600 2.00 1.500

ES DAUN BOUVEN BV1 2.000 0.400 0.600 2.00 0.960


-
ES DAUN BOUVEN BV2 2.000 0.400 0.800 1.00 0.640
KUSEN DAN ASSESORIES

LT 1 JLH KUSEN AMBANG T SP JML AMBANG T TGH JML AMBANG BWH JLH AMBANG TGH JML AMBANG ATAS JML PANJANG TTL JUMLAH/UNIT JML TOTAL

KUSEN PINTU P2 2.000 2.100 2.00 - - 1 0.900 1.00 10.200


ENGSEL 2.000 3.000 6.000
SPRINGKNEEP 2.000 -
KAIT ANGIN 2.000 -
HANDEL 2.000 1.000 2.000
DOORCLOSER 2.000 1.000 2.000
20.000
KUSEN PINTU P3 3.000 2.100 2.00 - - 1 0.700 1.00 14.700
ENGSEL 3.000 3.000 9.000
SPRINGKNEEP 3.000 -
KAIT ANGIN 3.000 -
HANDEL 3.000 1.000 3.000
DOORCLOSER 3.000 -

KUSEN PINTU P4 1.000 2.600 2.00 - - - 0 1.600 2.00 8.400


ENGSEL 1.000 6.000 6.000
SPRINGKNEEP 1.000 -
KAIT ANGIN 1.000 -
HANDEL 1.000 2.000 2.000
DOORCLOSER 1.000 2.000 2.000

KUSEN PINTU PS 12.000 0.900 2.00 - - - 0 0.700 2.00 38.400


ENGSEL 12.000 2.000 24.000
SPRINGKNEEP 12.000 -
KAIT ANGIN 12.000 -
HANDEL 12.000 1.000 12.000
DOORCLOSER 12.000 -

KUSEN PINTU PB 2.000 1.880 2.00 - - 1 0.900 1.00 9.320


ENGSEL 2.000 3.000 6.000
SPRINGKNEEP 2.000 -
KAIT ANGIN 2.000 -
HANDEL 2.000 1.000 2.000
DOORCLOSER 2.000 1.000 2.000

KUSEN JENDELA J1 6.000 2.100 2.00 0.850 1.00 0.850 2.00 - 1 - 1.00 40.500
ENGSEL 6.000 - -
SPRINGKNEEP 6.000 - -
KAIT ANGIN 6.000 - -
HANDEL 6.000 - -
DOORCLOSER 6.000 - -
KUSEN JENDELA J2 4.000 2.100 5.00 3.450 3.00 - 1.00 - 1 - 1.00 83.400
ENGSEL 4.000 8.000 32.000
SPRINGKNEEP 4.000 4.000 16.000
KAIT ANGIN 4.000 8.000 32.000
HANDEL 4.000 - -
DOORCLOSER 4.000 - -

KUSEN JENDELA J3 1.000 2.100 5.00 2.650 2.00 - 1.00 - 1 - 1.00 15.800
ENGSEL 1.000 - -
SPRINGKNEEP 1.000 - -
KAIT ANGIN 1.000 - -
HANDEL 1.000 - -
DOORCLOSER 1.000 - -

KUSEN JENDELA J4 2.000 2.100 2.00 0.750 3.00 - 1.00 - 1 - 1.00 12.900
ENGSEL 2.000 - -
SPRINGKNEEP 2.000 - -
KAIT ANGIN 2.000 - -
HANDEL 2.000 - -
DOORCLOSER 2.000 - -

KUSEN JENDELA JP 6.000 5.600 2.00 0.500 4.00 - 1.00 - 1 - 1.00 79.200
ENGSEL 6.000 - -
SPRINGKNEEP 6.000 - -
KAIT ANGIN 6.000 - -
HANDEL 6.000 - -
DOORCLOSER 6.000 - -

KUSEN JENDELA JS 2.000 19.200 1.00 26.400 1.00 - 1.00 - 1 - 1.00 91.200
ENGSEL 2.000 - -
SPRINGKNEEP 2.000 - -
KAIT ANGIN 2.000 - -
HANDEL 2.000 - -
DOORCLOSER 2.000 - -

KUSEN BOUVEN B2 4.000 0.400 3.00 1.350 2.00 - 1.00 - 0 - 1.00 15.600
ENGSEL 4.000 4.000 16.000
SPRINGKNEEP 4.000 2.000 8.000
KAIT ANGIN 4.000 4.000 16.000
HANDEL 4.000 - -
DOORCLOSER 4.000 - -

KUSEN BOUVEN B1 1.000 0.500 2.00 0.700 2.00 - 1.00 - 0 - 1.00 2.400
ENGSEL 1.000 2.000 2.000
SPRINGKNEEP 1.000 1.000 1.000
KAIT ANGIN 1.000 2.000 2.000
HANDEL 1.000 - -
DOORCLOSER 1.000 - -
LT 2 JLH KUSEN AMBANG T SP JML AMBANG T TGH JML AMBANG BWH JLH AMBANG TGH JML AMBANG ATAS JML PANJANG TTL JUMLAH/UNIT JML TOTAL

KUSEN PINTU P2 3.000 2.100 2.00 - - 1 0.900 1.00 15.300


ENGSEL 3.000 3.000 9.000
SPRINGKNEEP 3.000 -
KAIT ANGIN 3.000 -
HANDEL 3.000 1.000 3.000
DOORCLOSER 3.000 1.000 3.000
23.000
KUSEN PINTU P3 8.000 2.100 2.00 - - 1 0.700 1.00 39.200
ENGSEL 8.000 3.000 24.000
SPRINGKNEEP 8.000 -
KAIT ANGIN 8.000 -
HANDEL 8.000 1.000 8.000
DOORCLOSER 8.000 -

KUSEN PINTU PS 12.000 0.900 2.00 - - - 0 0.700 2.00 38.400


ENGSEL 12.000 2.000 24.000
SPRINGKNEEP 12.000 -
KAIT ANGIN 12.000 -
HANDEL 12.000 1.000 12.000
DOORCLOSER 12.000 -

KUSEN JENDELA J1 6.000 2.100 2.00 0.850 1.00 0.850 2.00 - 1 - 1.00 40.500
ENGSEL 6.000 - -
SPRINGKNEEP 6.000 - -
KAIT ANGIN 6.000 - -
HANDEL 6.000 - -
DOORCLOSER 6.000 - -

KUSEN JENDELA J2 4.000 2.100 5.00 3.450 3.00 - 1.00 - 1 - 1.00 83.400
ENGSEL 4.000 8.000 32.000
SPRINGKNEEP 4.000 4.000 16.000
KAIT ANGIN 4.000 8.000 32.000
HANDEL 4.000 - -
DOORCLOSER 4.000 - -

KUSEN JENDELA JA 6.000 1.500 2.00 0.850 2.00 - 1.00 - 1 - 1.00 28.200
ENGSEL 6.000 - -
SPRINGKNEEP 6.000 - -
KAIT ANGIN 6.000 - -
HANDEL 6.000 - -
DOORCLOSER 6.000 - -

KUSEN JENDELA JB 1.000 1.400 3.00 3.150 2.00 - 1.00 - 1 - 1.00 10.500
ENGSEL 1.000 - -
SPRINGKNEEP 1.000 - -
KAIT ANGIN 1.000 - -
HANDEL 1.000 - -
DOORCLOSER 1.000 - -

KUSEN JENDELA JN 2.000 1.400 2.00 1.500 2.00 - 1.00 - 1 - 1.00 11.600
ENGSEL 2.000 - -
SPRINGKNEEP 2.000 - -
KAIT ANGIN 2.000 - -
HANDEL 2.000 - -
DOORCLOSER 2.000 - -

KUSEN BOUVEN B2 4.000 0.400 3.00 1.350 2.00 - 1.00 - 0 - 1.00 15.600
ENGSEL 4.000 4.000 16.000
SPRINGKNEEP 4.000 2.000 8.000
KAIT ANGIN 4.000 4.000 16.000
HANDEL 4.000 - -
DOORCLOSER 4.000 - -

KUSEN BOUVEN B1 2.000 0.500 2.00 0.700 2.00 - 1.00 - 0 - 1.00 4.800
ENGSEL 2.000 2.000 4.000
SPRINGKNEEP 2.000 1.000 2.000
KAIT ANGIN 2.000 2.000 4.000
HANDEL 2.000 - -
DOORCLOSER 2.000 - -
KUSEN PINTU P2 5.000 2.600 2.00 - - 1.600 1 1.600 1.00 42.000
ENGSEL 5.000 6.000 30.000
SPRINGKNEEP 5.000 -
KAIT ANGIN 5.000 -
HANDEL 5.000 2.000 10.000
DOORCLOSER 5.000 2.000 10.000
13.000
KUSEN PINTU P3 2.000 2.600 2.00 - - 1.500 1 1.500 1.00 16.400
ENGSEL 2.000 6.000 12.000
SPRINGKNEEP 2.000 -
KAIT ANGIN 2.000 -
HANDEL 2.000 2.000 4.000
DOORCLOSER 2.000 2.000 4.000

KUSEN PINTU P4 4.000 2.100 2.00 - - - 0 0.700 1.00 19.600


ENGSEL 4.000 3.000 12.000
SPRINGKNEEP 4.000 -
KAIT ANGIN 4.000 -
HANDEL 4.000 1.000 4.000
DOORCLOSER 4.000 1.000 4.000

KUSEN PINTU P6 1.000 2.600 2.00 - - 1.600 1 1.600 1.00 8.400


ENGSEL 1.000 6.000 6.000
SPRINGKNEEP 1.000 -
KAIT ANGIN 1.000 -
HANDEL 1.000 2.000 2.000
DOORCLOSER 1.000 2.000 2.000

KUSEN PINTU PJ2 1.000 2.600 2.00 1.750 1.00 - - 0.600 1 1.700 2.00 10.950
ENGSEL 1.000 3.000 3.000
SPRINGKNEEP 1.000 -
KAIT ANGIN 1.000 -
HANDEL 1.000 2.000 2.000
DOORCLOSER 1.000 1.000 1.000

KUSEN JENDELA J1 14.000 2.100 2.00 2.100 2.00 2.600 1.00 2.600 1 2.600 1.00 226.800
ENGSEL 14.000 6.000 84.000
SPRINGKNEEP 14.000 2.000 28.000
KAIT ANGIN 14.000 6.000 84.000
HANDEL 14.000 - -
DOORCLOSER 14.000 - -

KUSEN JENDELA J2 1.000 2.100 2.00 2.100 2.00 2.600 1.00 2.600 1 2.600 1.00 16.200
ENGSEL 1.000 4.000 4.000
SPRINGKNEEP 1.000 2.000 2.000
KAIT ANGIN 1.000 4.000 4.000
HANDEL 1.000 - -
DOORCLOSER 1.000 - -

KUSEN JENDELA J3 1.000 2.000 2.00 2.000 1.00 1.550 1.00 1.550 1 1.550 1.00 10.650
ENGSEL 1.000 2.000 2.000
SPRINGKNEEP 1.000 1.000 1.000
KAIT ANGIN 1.000 2.000 2.000
HANDEL 1.000 - -
DOORCLOSER 1.000 - -

KUSEN JENDELA J6 4.000 3.240 2.00 1.030 1.00 1.030 1.00 34.160
ENGSEL 4.000 -
SPRINGKNEEP 2.000 -
KAIT ANGIN 4.000 -
HANDEL - -
DOORCLOSER - -

KUSEN JENDELA JP 2.000 2.100 2.00 2.100 1.00 1.650 1.00 1.650 1 1.650 1.00 22.500
ENGSEL 2.000 4.000 8.000
SPRINGKNEEP 2.000 1.000 2.000
KAIT ANGIN 2.000 4.000 8.000
HANDEL 2.000 - -
DOORCLOSER 2.000 - -

KUSEN BOUVEN BV1 2.000 0.500 2.00 0.500 1.00 1.350 1.00 - 0 1.350 1.00 8.400
ENGSEL 2.000 4.000 8.000
SPRINGKNEEP 2.000 2.000 4.000
KAIT ANGIN 2.000 4.000 8.000
HANDEL 2.000 - -
DOORCLOSER 2.000 - -
KUSEN BOUVEN BV2 2.000 0.500 2.00 - - 0.900 1.00 - 0 0.900 1.00 5.600
ENGSEL 2.000 2.000 4.000
SPRINGKNEEP 2.000 1.000 2.000
KAIT ANGIN 2.000 2.000 4.000
HANDEL 2.000 - -
DOORCLOSER 2.000 - -

Anda mungkin juga menyukai