Anda di halaman 1dari 5

No ITEM Satuan (IDR) JUMLAH

A. BIAYA OPERASIONAL

1 Transpot Rumah-Bandara (Pulang - Pergi) 400,000 /Orang 6 Orang

2 Tiket Pesawat (Pulang-Pergi) 2,000,000 /Orang 6 Orang

3 Kendaraan (2 Unit @ Rp 1.500.000) 3,000,000 /Hari 25 Hari

4 Bahan Bakar (2 Unit @ Rp 300.000) 600,000 /Hari 25 Hari

5 Konsumsi (14 Orang @ Rp 150.000) 2,100,000 /Hari 25 Hari

6 Penginapan (4 Kamar @ Rp 500.000) 2,000,000 /Malam 25 Malam

7 Helper (8 Orang @ Rp 150.000) 1,200,000 /Hari 25 Hari

8 Analisis Laboratorium 1,500,000 /Sample 20 Sample

9 Koordinasi dll 20,000,000

Sub-total

B. GAJI

1 Geologist (4 Orang @ Rp 800.000) 3,200,000 /Hari 25 Hari

Sub-total

TOTAL
Total (IDR)

2,400,000

12,000,000

75,000,000

15,000,000

52,500,000

50,000,000

30,000,000

30,000,000

20,000,000

286,900,000

80,000,000

80,000,000

366,900,000
No KETERANGAN LOKASI RENCANA KERJA
1 2
1 Perjalanan Jakarta - Belitung
Studi Literatur dan
Regional
2 Studi Awal Lokasi Basecamp
Review data
Mencari tenaga lokal
Existing Penambangan
Blok IUP Lilangan Pemetaan Blok dan
Pengambilan Data Lapangan Pengambilan Sampel
3
(Permukaan) Analisis Sampel
Basecamp Megaskopis dan
Perencanaan Test Pit
Pemetaan kondisi jalan
Pelabuhan dan
dan Jetty atau pelabuhan
Akses ke Pelabuhan
4 Pemetaan Non Teknis terdekat (Bathymetry)
Dinas dan Instansi Evaluasi data dinas dan
Terkait instansi terkait
Pengambilan Sample Test
Blok IUP Lilangan
Pengambilan Sample Bawah Pit
5
Permukaan Analisis Laboratorium
Laboratorium
(Pengiriman)
Pengolahan Data dan Interpretasi, dan
5 Basecamp
Penyusunan Laporan kesimpulan
6 Perjalanan Belitung - Jakarta
Mar-20
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
20 21 22 23 24 25