JADWAL WAKTU PELAKSANAAN (S CURVE)

PEMBANGUNAN GEDUNG KULIAH PRODI TEKNIK MESIN ALAT BERAT DAN BENGKEL TEKNIK LISTRIK INDUSTRI POLITEKNIK NEGERI MADURA

Bobot MASA PELAKSANAAN 210 ( DUA RATUS SEPULUH ) HARI KALENDER


NO. Uraian Fisik
M-1 M-2 M-3 M-4 M-5 M-6 M-7 M-8 M-9 M-10 M-11 M-12 M-13 M-14 M-15 M-16 M-17 M-18 M-19 M-20 M-21 M-22 M-23 M-24 M-25 M-26 M-27 M-28 M-29
GEDUNG BENGKEL TEKNIK LISTRIK INDUSTRI
PEKERJAAN ARSITEKTUR (STANDART)
A PEKERJAAN PERSIAPAN 0.306 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010

B PEKERJAAN K3 0.450 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015

C PEKERJAAN PASANGAN DINDING 2.789 0.139 0.139 0.139 0.139 0.139 0.139 0.139 0.139 0.139 0.139 0.139 0.139 0.139 0.139 0.139 0.139 0.139 0.139 0.139 0.139

D PEKERJAAN PELAPIS LANTAI DAN DINDING 2.219 0.111 0.111 0.111 0.111 0.111 0.111 0.111 0.111 0.111 0.111 0.111 0.111 0.111 0.111 0.111 0.111 0.111 0.111 0.111 0.111

E PEKERJAAN PASANGAN PLAFOND 0.307 0.077 0.077 0.077 0.077

F PEKERJAAN PINTU DAN JENDELA 0.829 0.207 0.207 0.207 0.207

G PEKERJAAN SANITAIR 0.194 0.048 0.048 0.048 0.048

H PEKERJAAN PENGECATAN DINDING DAN PLAFOND 0.569 0.190 0.190 0.190

PEKERJAAN ARSITEKTUR (NON STANDART)


A PEKERJAAN PELAPIS DINDING 1.076 0.179 0.179 0.179 0.179 0.179 0.179

B PEKERJAAN PELAPIS LANTAI 0.041 0.020 0.020

C PEKERJAAN PINTU DAN JENDELA 0.457 0.152 0.152 0.152

D PEKERJAAN ATAP 1.554 0.389 0.389 0.389 0.389

E PEKERJAAN RAILLING 0.244 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020

F PEKERJAAN LANDSCAPE 2.660 0.887 0.887 0.887

G PEKERJAAN SALURAN DAN RABATAN 1.225 0.245 0.245 0.245 0.245 0.245

PEKERJAAN STRUKTUR (NON STANDAR)


A PEKERJAAN TIANG PANCANG 2.696 1.348 1.348

B PEKERJAAN PONDASI POER 1.776 0.592 0.592

C PEKERJAAN BETON LANTAI 1 11.305 2.261 2.261 2.261 2.261 2.261

D PEKERJAAN BETON LANTAI 2 5.065 2.532 2.532

E PEKERJAAN BETON LANTAI 3 DAN ATAP 3.273 1.091 1.091

F PEKERJAAN ATAP BAJA 2.678

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL


A PEKERJAAN ELEKTRIKAL 2.038 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068

B PEKERJAAN ELEKTRONIKA 0.545 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027

C PEKERJAAN MEKANIKAL 0.673 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034

PEKERJAAN PEMBANGUNAN GEDUNG KULIAH TEKNIK MESIN ALAT BERAT (TMAB)


PEKERJAAN ARSITEK (STANDART)
A PEKERJAAN PERSIAPAN 0.085 0.021 0.021 0.021 0.021

B PEKERJAAN PASANGAN DINDING 2.887 0.722 0.722 0.722 0.722

C PEKERJAAN PELAPIS LANTAI DAN DINDING 9.707 2.427 2.427 2.427 2.427

D PEKERJAAN PASANGAN PLAFOND 2.699 0.675 0.675 0.675 0.675

E PEKERJAAN PINTU DAN JENDELA 2.337 0.779 0.779 0.779

F PEKERJAAN SANITAIR 0.569 0.095 0.095 0.095 0.095 0.095 0.095

G PEKERJAAN PENGECATAN DINDING DAN PLAFOND 1.554 0.777 0.777

H PEKERJAAN ATAP 3.117 1.039 1.039 1.039

I PEKERJAAN RAILLING 0.952 0.238 0.238 0.238 0.238

J PEKERJAAN LANDSCAPE 5.243 0.437 0.437 0.437 0.437 0.437 0.437 0.437 0.437 0.437 0.437 0.437 0.437

K PEKERJAAN SALURAN DAN RABATAN 3.367 1.122 1.122 1.122


PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
A PEKERJAAN ELEKTRIKAL 5.965 1.193 1.193 1.193 1.193 1.193

B PEKERJAAN ELEKTRONIKA 2.301 1.150 1.150

C PEKERJAAN MEKANIKAL 14.250 4.750 4.750

100.000

RENCANA KEMAJUAN FISIK 0.068 0.068 0.068 0.095 0.095 0.095 0.129 0.150 0.150 0.872 0.872 0.851 0.851 0.566 1.343 1.343 1.605 5.899 5.899 6.221 6.221 3.898 1.583 1.412 0.633 3.879 3.846 6.004 6.004

RENCANA KEMAJUAN FISIK KOMULATIF - 0.068 0.136 0.204 0.299 0.394 0.489 0.618 0.768 0.918 1.790 2.662 3.513 4.363 4.929 6.272 7.614 9.219 15.119 21.018 27.239 33.459 37.357 38.940 40.352 40.985 44.865 48.710 54.714 60.718

- - -
- - -
- - -

- - -
- - -
PELAKSANAAN (S CURVE)

AT DAN BENGKEL TEKNIK LISTRIK INDUSTRI POLITEKNIK NEGERI MADURA

MASA PELAKSANAAN 210 ( DUA RATUS SEPULUH ) HARI KALENDER


Ket
M-30

0.010

0.015

0.592

1.091

0.068
4.750

5.909
66.627
NO URAIAN PEKERJAAN JUMLAH TOTAL
1 GEDUNG BENGKEL TEKNIK LISTRIK INDUSTRI
1.1 PEKERJAAN ARSITEKTUR (STANDART)
A PEKERJAAN PERSIAPAN Rp 80,400,000.00
B PEKERJAAN K3 Rp 118,320,000.00
C PEKERJAAN PASANGAN DINDING Rp 732,735,985.22
D PEKERJAAN PELAPIS LANTAI DAN DINDING Rp 583,103,390.96
E PEKERJAAN PASANGAN PLAFOND Rp 80,588,494.61
F PEKERJAAN PINTU DAN JENDELA Rp 217,763,048.00
G PEKERJAAN SANITAIR Rp 50,869,860.20
H PEKERJAAN PENGECATAN DINDING DAN PLAFOND Rp 149,395,683.03
TOTAL Rp 2,013,176,462.01
1.2 PEKERJAAN ARSITEKTUR (NON STANDART)
A PEKERJAAN PELAPIS DINDING Rp 282,761,641.69
B PEKERJAAN PELAPIS LANTAI Rp 10,646,713.00
C PEKERJAAN PINTU DAN JENDELA Rp 119,948,949.56
D PEKERJAAN ATAP Rp 408,308,000.00
E PEKERJAAN RAILLING Rp 63,989,146.52
F PEKERJAAN LANDSCAPE Rp 698,865,476.44
G PEKERJAAN SALURAN DAN RABATAN Rp 321,774,215.50
TOTAL Rp 1,906,294,142.70
1.3 PEKERJAAN STRUKTUR (NON STANDAR)
A PEKERJAAN TIANG PANCANG Rp 708,250,000.00
B PEKERJAAN PONDASI POER Rp 466,479,714.86
C PEKERJAAN BETON LANTAI 1 Rp 2,970,159,820.73
D PEKERJAAN BETON LANTAI 2 Rp 1,330,678,633.31
E PEKERJAAN BETON LANTAI 3 DAN ATAP Rp 859,984,599.57
F PEKERJAAN ATAP BAJA Rp 703,573,938.10
TOTAL Rp 7,039,126,706.58
1.4 PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
A PEKERJAAN ELEKTRIKAL Rp 535,432,125.00
B PEKERJAAN ELEKTRONIKA Rp 143,203,100.00
C PEKERJAAN MEKANIKAL Rp 176,796,300.00
TOTAL Rp 855,431,525.00

2 PEKERJAAN PEMBANGUNAN GEDUNG KULIAH TEKNIK MESIN ALAT BERAT (TMAB)


2.1 PEKERJAAN ARSITEK (STANDART)
A PEKERJAAN PERSIAPAN Rp 22,400,000.00
B PEKERJAAN PASANGAN DINDING Rp 758,403,142.46
C PEKERJAAN PELAPIS LANTAI DAN DINDING Rp 2,550,144,171.97
D PEKERJAAN PASANGAN PLAFOND Rp 709,187,038.91
E PEKERJAAN PINTU DAN JENDELA Rp 613,943,908.01
F PEKERJAAN SANITAIR Rp 149,431,187.40
G PEKERJAAN PENGECATAN DINDING DAN PLAFOND Rp 408,281,657.88
H PEKERJAAN ATAP Rp 819,000,000.00
I PEKERJAAN RAILLING Rp 250,031,613.39
J PEKERJAAN LANDSCAPE Rp 1,377,470,809.22
K PEKERJAAN SALURAN DAN RABATAN Rp 884,547,401.64
TOTAL Rp 8,542,840,930.89
2.2 PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
A PEKERJAAN ELEKTRIKAL Rp 1,567,260,130.63
B PEKERJAAN ELEKTRONIKA Rp 604,488,800.00
C PEKERJAAN MEKANIKAL Rp 3,743,792,611.71
TOTAL Rp 5,915,541,542.34
TOTAL Rp 26,272,411,309.52
TOTAL KESELURUHAN Rp 26,272,411,309.52
PPN 10% Rp 2,627,241,130.95
TOTAL Rp 28,899,652,440.47
DIBULATKAN Rp 28,899,652,000.00
dua puluh delapan miliar delapan ratus sembilan puluh sembilan juta enam ratus lima puluh dua ribu

Nama Perusahaan
CV/ PT

Nama Terang
Direktur
BILL OF QUANTITY
(BOQ)
Paket : (PAKET - 01)
Kegiatan : REHABILITASI DAN PEMBANGUNAN PRASARANA INFRASTRUKTUR PERGURUAN TINGGI NEGERI (PTN) DAN PASAR DI PROVINSI JAWA TIMUR
Pekerjaan : PEMBANGUNAN GEDUNG KULIAH PRODI TEKNIK MESIN ALAT BERAT DAN BENGKEL TEKNIK LISTRIK INDUSTRI POLITEKNIK NEGERI MADURA
Lokasi : KABUPATEN SAMPANG
Tahun : 2019

NO. URAIAN PEKERJAAN SAT VOLUME HARGA SATUAN JUMLAH HARGA

1 2 3 4 Rp 5.00 6=(4x5)
1 GEDUNG BENGKEL TEKNIK LISTRIK INDUSTRI
11 PEKERJAAN ARSITEKTUR (STANDART)
A PEKERJAAN PERSIAPAN
1 Penyediaan air dan Daya Kerja ls 1.00 Rp 18,000,000.00 Rp 18,000,000.00
2 Pembersihan Lokasi Kerja ls 1.00 Rp 5,000,000.00 Rp 5,000,000.00
3 Pengadaan Kontaineer Ket 20 feet + Ac Standart Panasonic 1 PK Unit 1.00 Rp 35,000,000.00 Rp 35,000,000.00
4 Pengukuran dan Pemasangan Bouwplank ls 1.00 Rp 5,000,000.00 Rp 5,000,000.00
5 Pembuatan Pagar Seng tinggi 2 meter Proyek keliling ls 1.00 Rp 12,000,000.00 Rp 12,000,000.00
6 Pembuatan spanduk banner proyek m2 120.00 Rp 45,000.00 Rp 5,400,000.00
JUMLAH. A Rp 80,400,000.00

B PEKERJAAN K3
1 Pekerjaan K3 ls 1.00 Rp 118,320,000.00 Rp 118,320,000.00
JUMLAH. B Rp 118,320,000.00
C PEKERJAAN PASANGAN DINDING
1 LANTAI SATU
1 Pasangan dinding bata ringan m² 840.60 Rp 168,866.13 Rp 141,948,868.35
2 Plesteran (semen instan) m² 1,681.20 Rp 92,949.04 Rp 156,265,921.85
3 Acian (semen instan) m² 1,681.20 Rp 36,482.72 Rp 61,334,740.46
4 Benangan sudut m 332.20 Rp 19,156.04 Rp 6,363,636.07
5 Benangan Opening Kusen Pintu & Jendela m' 313.45 Rp 19,156.04 Rp 6,004,460.35
6 Kolom praktis 10 x 10 m³ 1.75 Rp 5,881,668.99 Rp 10,292,920.74
7 Balok latei 12 x 10 m³ 1.28 Rp 8,850,953.29 Rp 11,329,220.22
8 Acian Beton Kolom m² 346.50 Rp 36,482.72 Rp 12,641,260.75
9 Roster uk. 30 x 30 m² 21.12 Rp 800,193.65 Rp 16,900,089.82
10 Meja beton T.8 cm m3 0.24 Rp 5,453,944.70 Rp 1,308,946.73
JUMLAH. C1 Rp 424,390,065.33
2 LANTAI DUA
1 Pasangan dinding bata ringan m² 418.01 Rp 168,866.13 Rp 70,587,730.74
2 Plesteran (semen instan) m² 836.02 Rp 92,949.04 Rp 77,707,254.33
3 Acian (semen instan) m² 836.02 Rp 36,482.72 Rp 30,500,279.39
4 Benangan sudut m 231.60 Rp 19,156.04 Rp 4,436,538.57
5 Benangan Opening Kusen Pintu & Jendela m' 535.76 Rp 19,156.04 Rp 10,263,039.32
6 Kolom praktis 10 x 10 m³ 2.10 Rp 7,518,774.26 Rp 15,789,425.95
7 Balok latei 12 x 10 m³ 2.19 Rp 7,535,244.33 Rp 16,502,185.09
8 Acian Beton Kolom m² 459.38 Rp 36,482.72 Rp 16,759,429.62
9 Meja beton T.8 cm m3 0.24 Rp 5,453,944.70 Rp 1,308,946.73
JUMLAH. C2 Rp 243,854,829.75
3 LANTAI ATAP
1 Pasangan dinding bata ringan m² 141.46 Rp 168,866.13 Rp 23,887,802.66
2 Plesteran dry mix m² 282.92 Rp 92,949.04 Rp 26,297,141.69
3 Acian (semen instan) m² 282.92 Rp 36,482.72 Rp 10,321,689.73
4 Benangan Opening Kusen Pintu & Jendela m' 208.00 Rp 19,156.04 Rp 3,984,456.06
JUMLAH. C3 Rp 64,491,090.14
TOTAL (C1+C2+C3) Rp 732,735,985.22
D PEKERJAAN PELAPIS LANTAI DAN DINDING
1 LANTAI SATU
1 Lantai Keramik. Uk. 30 x 30 Unpolish (CT-3-UP) Toilet m² 21.76 Rp 124,239.85 Rp 2,703,459.08
2 Lantai Homogenous Tile. Uk. 30 x 60 Unpolish Trap Tangga (stepnosing) m' 38.64 Rp 363,363.66 Rp 14,040,371.82
3 Lantai Homogenous Tile. Uk. 20 x 60 Unpolish Plin trap Tangga m' 38.64 Rp 363,363.66 Rp 14,040,371.82
4 Lantai Homogenous Bordes. Uk. 60 x 60 Unpolish (HT-3-UP) m² 7.20 Rp 295,895.03 Rp 2,130,444.21
5 Dinding Keramik. Uk. 30 x 40 m² 77.28 Rp 136,145.22 Rp 10,521,302.79
6 Lantai Homogenous Tile. Uk. 60 x 60 (HT-3 UP) m² 195.35 Rp 295,895.03 Rp 57,803,093.87
7 Lantai Homogenous Tile. Uk. 60 x 60 (HT-3 UP) (teras) m² 19.66 Rp 295,895.03 Rp 5,817,296.27
8 Plin Homogenous tile uk.10 x60 (HT-3) m' 168.57 Rp 133,929.66 Rp 22,576,523.00
9 Floor Hardener m² 925.27 Rp 44,253.15 Rp 40,946,112.10
JUMLAH. D1 Rp 170,578,974.96
2 LANTAI DUA
1 Lantai Homogenous Tile. Uk. 60 x 60 (HT-3 UP) m² 212.23 Rp 295,895.03 Rp 62,797,801.95
2 Plin Homogenous tile uk.10 x60 (HT-3) m' 119.85 Rp 133,929.66 Rp 16,051,469.90
JUMLAH. D2 Rp 78,849,271.85
3 LANTAI ATAP
1 Waterproofing Atap m² 1,604.40 Rp 151,500.00 Rp 243,066,600.00
2 Screed Lantai m² 1,604.40 Rp 56,475.03 Rp 90,608,544.15
JUMLAH. D3 Rp 333,675,144.15
TOTAL (D1+D2+D3) Rp 583,103,390.96
E PEKERJAAN PASANGAN PLAFOND
1 LANTAI SATU
1.1 Gypsum (GP-1) m² 113.14 Rp 127,759.19 Rp 14,454,675.04
1.2 Calsiboard m² 21.76 Rp 139,850.41 Rp 3,043,144.87
1.3 Akustik m² 101.87 Rp 309,254.02 Rp 31,503,707.12
JUMLAH. E.1 Rp 49,001,527.03
2 LANTAI DUA
2.1 Gypsum (GP-1) m² 110.66 Rp 127,759.19 Rp 14,137,832.24
2.2 Akustik m² 124.77 Rp 139,850.41 Rp 17,449,135.34
JUMLAH. E.2 Rp 31,586,967.59
JUMLAH. (E1+E2) Rp 80,588,494.61
F PEKERJAAN PINTU DAN JENDELA
1 LANTAI SATU
A PINTU ALUMUNIUM
1 Pintu Type B-1 unit 2.00 Rp 4,500,000.00 Rp 9,000,000.00
2 Pintu Type E2-A unit 1.00 Rp 4,000,000.00 Rp 4,000,000.00
3 Pintu Type M-2 unit 4.00 Rp 4,200,000.00 Rp 16,800,000.00
4 Pintu Type C unit 2.00 Rp 3,500,000.00 Rp 7,000,000.00
5 Double Steel Door unit 1.00 Rp 10,511,000.00 Rp 10,511,000.00
B JENDELA ALUMUNIUM
1 Type J-6 unit 16.00 Rp 2,200,000.00 Rp 35,200,000.00
2 Type BV-3 unit 1.00 Rp 1,250,000.00 Rp 1,250,000.00
3 Tralis besi nako t=10mm m² 141.12 Rp 299,575.00 Rp 42,276,024.00
JUMLAH. F1 Rp 126,037,024.00
2 LANTAI DUA
A PINTU ALUMUNIUM
1 Pintu Type S unit 3.00 Rp 3,500,000.00 Rp 10,500,000.00
B JENDELA ALUMUNIUM
1 Type J-6 unit 16.00 Rp 2,200,000.00 Rp 35,200,000.00
2 Type BVB unit 3.00 Rp 1,250,000.00 Rp 3,750,000.00
3 Tralis besi nako t = 10mm m² 141.12 Rp 299,575.00 Rp 42,276,024.00
JUMLAH. F2 Rp 91,726,024.00
JUMLAH. (F1 + F2) Rp 217,763,048.00
G PEKERJAAN SANITAIR
LANTAI SATU
1 Closet Duduk Lengkap Asccories unit 4.00 Rp 3,400,471.28 Rp 13,601,885.13
2 Wastafel Under Counter Lengkap Accessories (Meja,kran, tempat sabun) unit 4.00 Rp 1,506,616.50 Rp 6,026,465.98
3 Closet Jongkok Lengkap Asccories unit 1.00 Rp 1,006,962.43 Rp 1,006,962.43
4 Kaca Cermin Bevel bh 4.00 Rp 772,171.01 Rp 3,088,684.03
5 Cove Lampu di atas Wastafel set 4.00 Rp 352,253.91 Rp 1,409,015.65
6 Top Table Granit Alam m² 3.33 Rp 1,068,893.61 Rp 3,559,415.70
7 Shower spray set 4.00 Rp 350,546.51 Rp 1,402,186.03
8 Tissue holder bh 4.00 Rp 105,760.38 Rp 423,041.53
9 Cubical toilet ( L ) unit 4.00 Rp 2,090,700.00 Rp 8,362,800.00
10 Cubical toilet ( I ) bh 1.00 Rp 2,090,700.00 Rp 2,090,700.00
11 Urinoir bh 2.00 Rp 2,392,486.74 Rp 4,784,973.48
12 Partition urinoir set 2.00 Rp 492,017.21 Rp 984,034.42
13 Kitcen sink m² 1.00 Rp 1,711,394.75 Rp 1,711,394.75
14 Foor Drain bh 5.00 Rp 361,238.12 Rp 1,806,190.58
15 Kran bh 1.00 Rp 612,110.50 Rp 612,110.50
JUMLAH. G Rp 50,869,860.20
JUMLAH. G Rp 50,869,860.20
H PEKERJAAN PENGECATAN DINDING DAN PLAFOND
1 LANTAI SATU
a. Pengecatan dinding
1 Interior Emulsion (P-1) m² 741.98 Rp 37,963.63 Rp 28,168,252.33
2 Exterior Weathershield (P-7) m² 352.57 Rp 56,547.63 Rp 19,936,997.03
3 Waterbase Majestic (P-3) m² 586.65 Rp 54,224.63 Rp 31,810,877.72
b. Pengecatan plafond
1 Gypsum(GP-1) m² 113.14 Rp 37,963.63 Rp 4,295,204.82
2 Calsiboard (P-1) m² 21.76 Rp 37,963.63 Rp 826,088.53
JUMLAH. H1 Rp 85,037,420.43
2 LANTAI DUA
a. Pengecatan dinding
1 Interior Emulsion (P-1) m² 276.31 Rp 37,963.63 Rp 10,489,729.91
2 Exterior Weathershield (P-7) m² 595.41 Rp 56,547.63 Rp 33,669,022.89
b. Pengecatan plafond
1 Gypsum(GP-1) m² 110.66 Rp 37,963.63 Rp 4,201,055.02
JUMLAH. H2 Rp 48,359,807.82
3 LANTAI ATAP
a. Pengecatan dinding
1 Exterior Weathershield ( P-7 ) m² 282.92 Rp 56,547.63 Rp 15,998,454.77
JUMLAH. H3 Rp 15,998,454.77
JUMLAH. Rp 149,395,683.03
2 PEKERJAAN PEMBANGUNAN GEDUNG KULIAH TEKNIK MESIN ALAT BERAT (TMAB) (H1+H2+H3)
1.2 PEKERJAAN ARSITEKTUR (NON STANDART)
A PEKERJAAN PELAPIS DINDING
1 FAÇADE
1. Pekerjaan Finishing Dinding
a. Sun Louvre ( Kisi - kisi 1 )
Sisi Kanan unit 10.00 Rp 2,684,675.00 Rp 26,846,750.00
Sisi Kiri unit 10.00 Rp 2,684,675.00 Rp 26,846,750.00
b. Sun louvre Hunter Douglas Luxalon 84R
Sisi Kanan m² 33.39 Rp 2,684,675.00 Rp 89,641,298.25
Sisi Kiri m² 29.68 Rp 2,684,675.00 Rp 79,681,154.00
c. Railling hollow
Sisi Depan m' 2.14 Rp 846,496.03 Rp 1,811,501.49
Sisi Belakang m' 2.14 Rp 846,496.03 Rp 1,811,501.49
Sisi Kiri m' 31.20 Rp 846,496.03 Rp 26,410,675.98
Sisi Kanan m' 35.10 Rp 846,496.03 Rp 29,712,010.48

JUMLAH A Rp 282,761,641.69
B PEKERJAAN PELAPIS LANTAI
1 LANTAI DUA
a Waterprofing coating m² 65.98 Rp 55,550.00 Rp 3,665,189.00
JUMLAH B1 Rp 3,665,189.00
2 LANTAI ATAP
b Waterprofing coating m² 125.68 Rp 55,550.00 Rp 6,981,524.00
JUMLAH B2 Rp 6,981,524.00
JUMLAH (B1+B2) Rp 10,646,713.00
C PEKERJAAN PINTU DAN JENDELA
1 JENDELA CW 1 Unit 1.00 Rp 45,521,951.76 Rp 45,521,951.76
2 JENDELA CW 2 Unit 1.00 Rp 30,788,284.01 Rp 30,788,284.01
3 JENDELA CW 3 Unit 1.00 Rp 18,160,761.96 Rp 18,160,761.96
4 JENDELA CW 4 Unit 1.00 Rp 22,277,951.83 Rp 22,277,951.83
5 Pintu besi bh 1.00 Rp 3,200,000.00 Rp 3,200,000.00
JUMLAH C Rp 119,948,949.56
D PEKERJAAN ATAP
1 Listplang Steel roof 0.5 klip-lok colourbond m1 163.31 Rp 125,000.00 Rp 20,413,750.00
2 Penutup atap Steel roof 0.5 klip-lok colourbond m² 1,391.11 Rp 275,000.00 Rp 382,555,250.00
Alumunium foil + Wiremesh + glaswoll
3 Bumbungan m1 56.20 Rp 95,000.00 Rp 5,339,000.00
JUMLAH D Rp 408,308,000.00
E PEKERJAAN RAILLING
1 LANTAI SATU
1 Railling tangga stainless m' 16.68 Rp 2,258,121.03 Rp 37,665,458.70
2 Hand Railling tangga stainless m' 25.68 Rp 1,025,065.73 Rp 26,323,687.82
JUMLAH E Rp 63,989,146.52
F PEKERJAAN LANDSCAPE
1 PENGERASAN
1 Pekerjaan Paving Stone tebal 8 cm, K-400 m² 1,057.90 Rp 126,250.00 Rp 133,559,875.00
2 Pekerjaan Tanah Urug Bawah Paving m3 105.79 Rp 147,742.80 Rp 15,629,710.81
3 Pekerjaan Kanstin m 186.02 Rp 84,840.00 Rp 15,781,936.80
JUMLAH F1 Rp 164,971,522.61
2 TANAMAN
1 Pohon Palem dia min 12-15 cm tinggi 3 m bh 7.00 Rp 750,000.00 Rp 5,250,000.00
2 Pohon Pule dia min.15 cm tinggi 3m bh 8.00 Rp 1,000,000.00 Rp 8,000,000.00
3 Pohon Ketapang kencana dia min.15 cm tinggi 3m bh 8.00 Rp 750,000.00 Rp 6,000,000.00
4 Pohon Tabepuya bunga warna Kuning dia min.15cm tinggi 3m bh 9.00 Rp 500,000.00 Rp 4,500,000.00
5 Pohon Tabepuya bunga warna Pink dia min.15 cm tinggi 3m bh 9.00 Rp 1,200,000.00 Rp 10,800,000.00
6 Pohon Tabepuya bunga warna Putih dia min.15 cm tinggi 3m bh 8.00 Rp 1,100,000.00 Rp 8,800,000.00
7 Rumput gajah mini m² 345.00 Rp 12,500.00 Rp 4,312,500.00
8 Tanah taman termasuk humus m3 147.60 Rp 90,000.00 Rp 13,284,000.00
9 Galian tanah untuk pohon dan tanaman m3 44.10 Rp 90,597.00 Rp 3,995,327.70
JUMLAH F2 Rp 64,941,827.70
3 SELASAR
1 Pekerjaan Tanah Urug Bawah Paving m3 5.25 Rp 147,742.80 Rp 775,649.70
2 Lantai Kerja Bawah Pondasi m3 1.76 Rp 996,738.90 Rp 1,754,260.46
3 Pasir Urug Bawah Pondasi m3 4.61 Rp 147,742.80 Rp 681,094.31
4 Galian Tanah Pondasi m3 140.40 Rp 90,597.00 Rp 12,719,818.80
5 Urugan Tanah Kembali Pondasi m3 133.37 Rp 30,199.00 Rp 4,027,640.63
6 Pekerjaan Pondasi Plat Setempat uk 130x130x25 m3 7.03 Rp 4,424,622.72 Rp 31,105,097.69
7 Pekerjaan Sloof Uk 25x40 m3 5.26 Rp 4,165,135.09 Rp 21,908,610.58
8 Pekerjaan Kolom Uk. 30x30 m3 2.43 Rp 6,163,285.74 Rp 14,976,784.34
9 Pekerjaan Kolom H Beam 125.125.6,5.9 Finish Cat kg 879.45 Rp 34,554.63 Rp 30,389,064.96
10 Pekerjaan Balok IWF 150.75.5.7 Finish Cat kg 736.40 Rp 34,554.63 Rp 25,446,025.85
11 Pekerjaan Balok IWF 100.50.5.7 Finish Cat kg 277.20 Rp 34,554.63 Rp 9,578,542.05
12 Pemasangan Plat Besi t 10mm Finish Cat m² 1.13 Rp 550,000.00 Rp 621,500.00
13 Pemasangan Plat Besi t 12mm Finish Cat m² 0.90 Rp 600,000.00 Rp 540,000.00
14 Pemasangan Anchor dia. 16mm bh 216.00 Rp 55,000.00 Rp 11,880,000.00
15 Pemasangan Anchor dia. 19mm bh 72.00 Rp 75,000.00 Rp 5,400,000.00
16 Gording C 100.50.20.3,2 Finish Cat kg 723.25 Rp 34,554.63 Rp 24,991,632.53
17 Atap UPVC m2 87.05 Rp 550,000.00 Rp 47,877,500.00
18 Pekerjaan Kansteen m' 52.60 Rp 84,840.00 Rp 4,462,584.00
19 Pekerjaan Paving Stone m2 52.54 Rp 126,250.00 Rp 6,633,175.00
JUMLAH F3 Rp 255,768,980.91
4 Pekerjaan Sumur Bor dan Pipa Penyiraman
1 Pek. Bor Sumur m1 120.00 Rp 1,200,000.00 Rp 144,000,000.00
2 Pas. Pipa PVC Ø 2 "AW Hisap sumur m1 100.00 Rp 65,000.00 Rp 6,500,000.00
3 Pas. Pipa PVC Ø 4 " AW Chasing sumur m1 120.00 Rp 125,000.00 Rp 15,000,000.00
4 Pas. Pipa PVC Ø 2 " AW m1 175.00 Rp 65,000.00 Rp 11,375,000.00
5 Pengadaan dan pemasangan tandon air Fiber, kap. 2200 L + rangka siku dan dudukan unit 1.00 Rp 7,500,000.00 Rp 7,500,000.00
6 Pompa Sub Sumersible daya 1,5 Kw 2 HP 1 phase, kapasitas daya dorong max 131 m, outlet 1 1/2 ich bh 1.00 Rp 5,000,000.00 Rp 5,000,000.00
7 Ground Water Tank + Ruang Pompa beton bertulang 7 tebal = 12 cm, Fc = 26,4 Mpa, finish keramik dinding,ukuran Rp 48,000,000.00 Rp 96,000,000.00
unit 2.00
4x5x2,5 m
8 Pompa semi jet pump Type JPC 3, Output : 850 watt, Input start : 8 600 watt, daya hisap : 11 meter, Daya dorong : 45 Rp 2,000,000.00 Rp 4,000,000.00
meter (max),total head : 56 meter, debit air : 2 m3/jam, bh 2.00
9 Pasang Pipa AW diam. 1 1/2" untuk taman M' 400.00 Rp 55,000.00 Rp 22,000,000.00
10 Pemasangan Kran 3/4 untuk penyiraman tanaman Bh 25.00 Rp 75,000.00 Rp 1,875,000.00
JUMLAH F4 Rp 313,250,000.00
4 Pekerjaan Tempat Sampah dan Bangku taman
1 Pemasangan tempat sampah 50 Liter, isi 4 (kering, basah, plastik, logam) + Besi + Pengecatan (setiap 20 meter) Unit 21.00 Rp 750,000.00 Rp 15,750,000.00
2 Pemasangan foot plat beton untuk tong sampah (30x30x15) m3 1.134 Rp 4,424,622.72 Rp 5,017,522.16
3 Pengadaan bangku taman besi tempa ukuran 2 x 0,5 Unit 15.000 Rp 2,500,000.00 Rp 37,500,000.00
JUMLAH F5 Rp 58,267,522.16
5 Pengadaan Gazebo
1 Pengadaan Gazebo Ukuran 2,5 x 2,5 m Unit 2.000 Rp 3,000,000.00 Rp 6,000,000.00
2 Pemasangan pondasi beton ukuran 30x30 m3 0.144 Rp 4,424,622.72 Rp 637,145.67
JUMLAH F6 Rp 6,637,145.67

JUMLAH F1 s/d F6 Rp 698,865,476.44


G PEKERJAAN SALURAN DAN RABATAN
1 SALURAN KELILING GEDUNG
1 Saluran U ditch U 40 m' 165.40 Rp 410,679.58 Rp 67,926,402.46
2 Bak kontrol 60X60 cm bh 16.00 Rp 207,000.00 Rp 3,312,000.00
3 Penutup Beton T.8 cm m3 2.02 Rp 5,453,944.70 Rp 11,016,968.29
4 Rabatan Keliling Gedung m² 165.40 Rp 996,738.90 Rp 164,860,614.12
5 Galian tanah saluran m3 49.62 Rp 90,597.00 Rp 4,495,423.14
6 Lantai kerja tebal 5cm bawah U-ditch m3 3.31 Rp 996,738.90 Rp 3,299,205.76
7 Rabatan Keliling Gedung K-175 tebal 8cm + tulangan wiremesh M8 m3 13.23 Rp 2,508,353.39 Rp 33,185,515.33
8 Kansteen sepatu pinggir rabatan m' 165.40 Rp 203,616.00 Rp 33,678,086.40
JUMLAH G Rp 321,774,215.50
13 PEKERJAAN STRUKTUR (NON STANDAR)
A PEKERJAAN TIANG PANCANG
1 Tiang Pancang 40x40cm, L=30 m K 450 m' 2,010.00 Rp 325,000.00 Rp 653,250,000.00
2 Mob. Demob Alat Berat (hammer) untuk pemancangan Ls 1.00 Rp 55,000,000.00 Rp 55,000,000.00
JUMLAH A Rp 708,250,000.00

B PEKERJAAN PONDASI POER


1 Galian tanah poer m3 104.07 Rp 90,597.00 Rp 9,428,429.79
2 Urug pasir bawah poor m3 28.41 Rp 147,742.80 Rp 4,197,372.95
3 Lantai kerja bawah poor m3 8.65 Rp 996,738.90 Rp 8,621,791.49
4 Beton Poor TypePCB1-1 m3 1.73 Rp 4,424,622.72 Rp 7,654,597.30
5 Beton Poor Type PCB1-2 m3 26.06 Rp 4,424,622.72 Rp 115,305,667.96
6 Beton Poor Type PCB1-3 m3 23.75 Rp 4,424,622.72 Rp 105,084,789.49
7 Beton Poor Type PCB1-4 m3 22.80 Rp 4,424,622.72 Rp 100,881,397.91
8 Beton Poor Type PCB1-2a m3 26.06 Rp 4,424,622.72 Rp 115,305,667.96
JUMLAH B Rp 466,479,714.86
C PEKERJAAN BETON LANTAI 1
I PEKERJAAN BALOK SLOOF
1 Urug pasir bawah sloof t = 10 cm m3 1.39 Rp 147,742.80 Rp 205,362.49
2 Lantai kerja bawah sloof t = 5 cm (1Pc:3Ps:5Kr) m3 0.46 Rp 996,738.90 Rp 458,499.89
3 Galian Tanah balok sloof m3 5.01 Rp 90,597.00 Rp 453,890.97
4 Type TB-1 m3 4.18 Rp 5,152,743.66 Rp 21,538,468.49
JUMLAH CI Rp 22,656,221.84
II PEKERJAAN KOLOM LT.1
1 Type CB-1 m3 7.70 Rp 6,163,285.74 Rp 47,457,300.18
2 Type CB-2 m3 1.05 Rp 6,163,285.74 Rp 6,471,450.02
3 Type CB-3 m3 0.50 Rp 6,163,285.74 Rp 3,081,642.87
4 Type CB-4 m3 3.50 Rp 6,163,285.74 Rp 21,571,500.08
5 Type CB-5 m3 1.05 Rp 6,163,285.74 Rp 6,471,450.02
6 Type CB-6 m3 0.48 Rp 6,163,285.74 Rp 2,958,377.15
JUMLAH C II Rp 88,011,720.33
III PEKERJAAN BALOK LT.1
1 Type TB-1 m3 35.64 Rp 8,159,566.17 Rp 290,806,938.38
2 Type TB-2 m3 66.53 Rp 8,159,566.17 Rp 542,855,937.44
3 Type BA-1 m3 24.30 Rp 8,159,566.17 Rp 198,277,457.99
4 Type BA-2 m3 15.40 Rp 8,159,566.17 Rp 125,657,319.05
5 Type KS-1 m3 11.31 Rp 8,159,566.17 Rp 92,284,693.41
6 Type KS-2 m3 1.00 Rp 8,159,566.17 Rp 8,159,566.17
JUMLAH C III Rp 1,258,041,912.44
IV PEKERJAAN PLAT LANTAI LT.1
1 Type A,B,C m3 277.60 Rp 5,547,646.23 Rp 1,540,026,593.91
2 Floor hardener m2 1,388.00 Rp 44,253.15 Rp 61,423,372.20
JUMLAH C IV Rp 1,601,449,966.11
JUMLAH Rp 2,970,159,820.73
(CI+CII+CIII+CIV)
D PEKERJAAN BETON LANTAI 2
I PEKERJAAN KOLOM LT.2
1 Type CB-1 m3 27.72 Rp 6,163,285.74 Rp 170,846,280.65
2 Type CB-2 m3 3.78 Rp 6,163,285.74 Rp 23,297,220.09
3 Type CB-3 m3 1.80 Rp 6,163,285.74 Rp 11,093,914.33
4 Type CB-5 m3 3.78 Rp 6,163,285.74 Rp 23,297,220.09
5 Type CB-6 m3 1.73 Rp 6,163,285.74 Rp 10,662,484.33
JUMLAH DI Rp 239,197,119.48
II PEKERJAAN BALOK LT.2
1 Type BI-1 m3 6.48 Rp 8,159,566.17 Rp 52,873,988.80
2 Type BI-2 m3 14.74 Rp 8,159,566.17 Rp 120,272,005.38
3 Type BI-3 m3 4.87 Rp 8,159,566.17 Rp 39,737,087.26
4 Type BI-4 m3 12.60 Rp 8,159,566.17 Rp 102,810,533.77
5 Type BL m3 4.82 Rp 8,159,566.17 Rp 39,329,108.95
6 Type BT m3 0.67 Rp 8,159,566.17 Rp 5,466,909.34
7 Type KS-1 m3 10.05 Rp 8,159,566.17 Rp 82,003,640.03
8 Type KS-2 m3 0.63 Rp 8,159,566.17 Rp 5,140,526.69
9 Type KS-3 m3 0.98 Rp 8,159,566.17 Rp 7,996,374.85
10 Type BA-2 m3 23.84 Rp 8,159,566.17 Rp 194,524,057.55
11 Type BA-3 m3 3.38 Rp 8,159,566.17 Rp 27,579,333.66
12 Type BA-4 m3 0.64 Rp 8,159,566.17 Rp 5,222,122.35
13 Type BA-5 m3 1.01 Rp 8,159,566.17 Rp 8,241,161.83
JUMLAH D II Rp 691,196,850.45
III PEKERJAAN PLAT LANTAI LT.2
1 Type A,B,C m3 69.16 Rp 5,547,646.23 Rp 383,675,213.38
2 Water Proofing coating m2 299.00 Rp 55,550.00 Rp 16,609,450.00
JUMLAH D III Rp 400,284,663.38
JUMLAH Rp 1,330,678,633.31
E PEKERJAAN BETON LANTAI 3 DAN ATAP (DI+DII+DIII)
I PEKERJAAN KOLOM LT.3
1 Type CB-1 m3 26.18 Rp 6,163,285.74 Rp 161,354,820.61
2 Type CB-2 m3 3.57 Rp 6,163,285.74 Rp 22,002,930.08
3 Type CB-6 m3 1.63 Rp 6,163,285.74 Rp 10,046,155.75
JUMLAH E I Rp 193,403,906.45
II PEKERJAAN BALOK LT.ATAP
1 Type BL-1 m3 19.44 Rp 8,159,566.17 Rp 158,621,966.39
2 Type RB-1 m3 15.39 Rp 8,159,566.17 Rp 125,575,723.39
3 Type RB-2 m3 6.48 Rp 8,159,566.17 Rp 52,873,988.80
4 Type RB-3 m3 1.62 Rp 8,159,566.17 Rp 13,218,497.20
5 Type RB-4 m3 2.59 Rp 8,159,566.17 Rp 21,133,276.39
6 Type RB-5 m3 0.38 Rp 8,159,566.17 Rp 3,100,635.15
7 Type BA-2 m3 1.55 Rp 8,159,566.17 Rp 12,647,327.57
8 Type KS-2 m3 0.63 Rp 8,159,566.17 Rp 5,140,526.69
9 Type KS-3 m3 8.93 Rp 8,159,566.17 Rp 72,864,925.92
JUMLAH E II Rp 465,176,867.48
III PEKERJAAN PLAT LANTAI LT.ATAP
1 Type E m3 33.00 Rp 5,547,646.23 Rp 183,072,325.65
2 Water Proofing coating m2 330.00 Rp 55,550.00 Rp 18,331,500.00
JUMLAH E III Rp 201,403,825.65
JUMLAH (EI+EII+EIII) Rp 859,984,599.57
F PEKERJAAN ATAP BAJA
I PEKERJAAN KONSTRUKSI BAJA
- ATAP UTAMA
1 Kuda-kuda WF 300.150.6,5.9 Kg 10,702.09 Rp 34,554.63 Rp 369,806,706.67
(Sudah termasuk hunc, endpalte, stifner dan alat penyambung)
2 Kolom Pendek WF 300.150.6,5.9 Kg 688.31 Rp 34,554.63 Rp 23,784,293.93
(Sudah termasuk hunc, endpalte, stifner dan alat penyambung)
3 Gording C 125.50.20.2,3 Kg 6,059.62 Rp 34,554.63 Rp 209,387,896.74
(Sudah termasuk alat penyambung)
4 Ikatan Angin dia. 16 mm Kg 562.34 Rp 34,554.63 Rp 19,431,447.82
5 Penggantung Gording dia. 12 mm Kg 132.35 Rp 34,554.63 Rp 4,573,304.62
JUMLAH F I Rp 626,983,649.78
II PEKERJAAN CAT BAJA
1 Cat Baja ZinkCromate M2 873.05 Rp 54,224.63 Rp 47,340,811.04
JUMLAH F II Rp 47,340,811.04
III PEKERJAAN PLAT TANGGA TANGGA LANTAI 1 KE 2
1 Balok Bordes 20/40 m3 0.26 Rp 8,159,566.17 Rp 2,121,487.20
2 Plat Tangga t=15 cm m3 3.71 Rp 5,547,646.23 Rp 20,581,767.52
3 Plat Bordes t=15 cm m3 1.18 Rp 5,547,646.23 Rp 6,546,222.55
JUMLAH F III Rp 29,249,477.28
JUMLAH (FI+FII+FIII) Rp 703,573,938.10
14 PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
A PEKERJAAN ELEKTRIKAL
I Pekerjaan Panel
1 MDP-Dasar, Panel Utama Gedung Bengkel Dasar Unit 1.00 Rp 50,226,250.00 Rp 50,226,250.00
2 PL-01, Panel Pembagi Penerangan & Tenaga Lantai - 01 Unit 1.00 Rp 31,931,475.00 Rp 31,931,475.00
3 PL-02, Panel Pembagi Penerangan & Tenaga Lantai - 02 Unit 1.00 Rp 54,842,925.00 Rp 54,842,925.00
4 P.PB, Panel Pembagi Pompa Booster Unit 1.00 Rp 31,931,475.00 Rp 31,931,475.00
JUMLAH AI Rp 168,932,125.00
II Instalasi Kabel Feeder Instalasi Tegangan Rendah
1 Dari Panel MDP ke PL-01
Kabel TR, NYY 4 x 150 mm² + BC 1 x 70 mm² m' 25.00 Rp 1,750,000.00 Rp 43,750,000.00
2 Dari Panel MDP ke PL-02
Kabel TR, NYY 4 x 4 mm² + NYA 1 x 2,5 mm² m' 35.00 Rp 95,000.00 Rp 3,325,000.00
3 Dari Panel MDP ke PL-03
Kabel TR, NYY 4 x 4 mm² + NYA 1 x 2,5 mm² m' 45.00 Rp 95,000.00 Rp 4,275,000.00
4 Dari Panel MDP ke P.PB
Kabel TR, NYY 4 x 4 mm² + NYA 1 x 2,5 mm² m' 55.00 Rp 95,000.00 Rp 5,225,000.00
5 Grounding :
- GR-1 Power BC 1 x 50 mm² ls 1.00 Rp 3,250,000.00 Rp 3,250,000.00
- GR-2 Alat BC 1 x 50 mm² ls 1.00 Rp 3,250,000.00 Rp 3,250,000.00
6 Tambah daya PLN 5500 watt ls 1.00 Rp 7,150,000.00 Rp 7,150,000.00

JUMLAH A II Rp 70,225,000.00
III Pekerjaan Instalasi Penerangan Lantai - 01
1 Armature lampu :
- Lampu Baret SCB 20 ACR Led Basic Plat 22 W + Battery Emergency Box bh 10.00 Rp 450,000.00 Rp 4,500,000.00
- Lampu Down Light RD 125 E 27 Leb Bulb 4 w Cover Glass bh 10.00 Rp 135,000.00 Rp 1,350,000.00
- Lampu Down Light Comport 150-75 Led DLS 13,6 - 1200lm bh 21.00 Rp 250,000.00 Rp 5,250,000.00
- Lampu RM 300 2x36 M2 T- Led Esential - 2x14,5 W 3200lm bh 10.00 Rp 550,000.00 Rp 5,500,000.00
- Lampu RMO T 2x36 T led Essential 2x14,5 Watt 3200lm bh 4.00 Rp 750,000.00 Rp 3,000,000.00
- Highbay Helios 150 W Led bh 28.00 Rp 5,000,000.00 Rp 140,000,000.00
- Emergency Kit c/w Battery & Charge Min. 2 Hours Backup bh 6.00 Rp 1,200,000.00 Rp 7,200,000.00
2 Peralatan Instalasi :
- Saklar 1 Gang 1 Way bh 1.00 Rp 30,000.00 Rp 30,000.00
- Saklar 2 Gang 1 Way bh 14.00 Rp 35,000.00 Rp 490,000.00
- Saklar 1 Gang 2 Way bh 2.00 Rp 40,000.00 Rp 80,000.00
- Stop Kontak Umum 1 Gang ( 2P+E ) Schuko - 250 V w/ Safety Shutter bh 8.00 Rp 35,000.00 Rp 280,000.00
- Stop Kontak Peralatan Outbow ( 2P+E ) Schuko - 250 V bh 10.00 Rp 35,000.00 Rp 350,000.00
- Stop Kontak Peralatan Outbow ( 3P+E ) - 400 V / IP44 bh 44.00 Rp 35,000.00 Rp 1,540,000.00
- Plugs 16 A / ( 3P+E ) - 400 V / IP44 bh 44.00 Rp 250,000.00 Rp 11,000,000.00
3 Instalasi penerangan, NYM 3 x 2,5 mm² dalam conduit PVC HI 20 mm² ttk 83.00 Rp 275,000.00 Rp 22,825,000.00
4 Instalasi stop kontak umum, NYM 3 x 2,5 mm² dalam conduit PVC HI 20 mm² ttk 8.00 Rp 280,000.00 Rp 2,240,000.00
5 Instalasi stop kontak peralatan 1Ø, NYM 3 x 2,5 mm² ttk 10.00 Rp 280,000.00 Rp 2,800,000.00
6 Instalasi stop kontak peralatan 3Ø, NYY 4 x 6 mm² ttk 44.00 Rp 300,000.00 Rp 13,200,000.00
7 Ceiling Mounted Exhaust Fan 10 " KM/WC, 36,8 W / 220 V / 564 CMH set 4.00 Rp 950,000.00 Rp 3,800,000.00
8 Instalasi Ceilling Mounted Exhaust Fan, NYM 3 x 2,5 mm² dalam conduit PVC HI 20 mm² ttk 4.00 Rp 220,000.00 Rp 880,000.00
9 Instalasi Penangkal Petir Early Streamer V3 set 1.00 Rp 17,000,000.00 Rp 17,000,000.00
JUMLAH A III Rp 243,315,000.00
IV Pekerjaan Instalasi Penerangan Lantai - 02
1 Armature lampu :
- Lampu Down Light Comport 150-75 Led DLS 13,6 - 1200lm bh 20.00 Rp 250,000.00 Rp 5,000,000.00
- Lampu RMO T 2x36 T led Essential 2x14,5 Watt 3200lm bh 10.00 Rp 750,000.00 Rp 7,500,000.00
- Emergency Kit c/w Battery & Charge Min. 2 Hours Backup bh 5.00 Rp 1,200,000.00 Rp 6,000,000.00
2 Peralatan Instalasi :
- Saklar 2 Gang 1 Way bh 4.00 Rp 35,000.00 Rp 140,000.00
- Stop Kontak Umum 1 Gang ( 2P+E ) Schuko - 250 V w/ Safety Shutter bh 6.00 Rp 35,000.00 Rp 210,000.00
3 Instalasi penerangan, NYM 3 x 2,5 mm² dalam conduit PVC HI 20 mm² ttk 30.00 Rp 275,000.00 Rp 8,250,000.00
4 Instalasi stop kontak umum, NYM 3 x 2,5 mm² dalam conduit PVC HI 20 mm² ttk 6.00 Rp 280,000.00 Rp 1,680,000.00
5 Portable Projector XGA (1024 x 768), 4000 Lumens ANSI lengkap dengan ceilling set 3.00 Rp 7,500,000.00 Rp 22,500,000.00
mount bracket
6 Instalasi Portable Projector, NYM 3 x 2,5 mm² dalam conduit PVC HI 20 mm² ttk 3.00 Rp 280,000.00 Rp 840,000.00
7 Instalasi Portable Projector, VGA dalam conduit PVC HI 20 mm² lengkap assesories ttk 3.00 Rp 280,000.00 Rp 840,000.00
JUMLAH A IV Rp 52,960,000.00
JUMLAH Rp 535,432,125.00
B PEKERJAAN ELEKTRONIKA (AI+AII+AIII+AIV)
I Pekerjaan Instalasi Telepon
Lantai-01
1 Main Distribution Frame Kapasitas 1 x 20 pair set 1.00 Rp 2,250,000.00 Rp 2,250,000.00
2 Terminal BOX c/w LSA 1 x 10 pairs set 1.00 Rp 50,000.00 Rp 50,000.00
3 Pesawat Telephone Analog KX-T505 set 2.00 Rp 250,000.00 Rp 500,000.00
4 Telepon Outlets ( FCC Standard ) /w Surround 1 Gang - 6 Wire bh 2.00 Rp 325,000.00 Rp 650,000.00
5 Instalasi Kabel Telepon ITC 2 x 2 x 0.6 mm² dalam conduit PVC HI 20 mm² ttk 2.00 Rp 320,000.00 Rp 640,000.00
6 Instalasi kabel feeder telepon dari MDF ke TB-01
- Instalasi Kabel Telepon ITC 10 x 2 x 0.6 mm² dalam conduit PVC HI 20 mm² m' 20.00 Rp 25,000.00 Rp 500,000.00
JUMLAH B I Rp 4,590,000.00
II Pekerjaan Instalasi Data / LAN
Lantai-01
1 Patch Panel / Wallmount 2 U unit 1.00 Rp 5,000,000.00 Rp 5,000,000.00
2 8-port UTP, 10/100Mbps, Auto-sensing, Unmanaged unit 1.00 Rp 3,000,000.00 Rp 3,000,000.00
3 Instalasi power wallmount, NYM 3 x 2,5 mm² dalam conduit PVC HI 20 mm² ttk 1.00 Rp 300,000.00 Rp 300,000.00
4 Outlet Data Cat6 c/w Modular Jack bh 2.00 Rp 75,000.00 Rp 150,000.00
5 Instalasi Kabel Data / LAN UTP Cable 4 Pairs (Cat 5e) dalam conduit PVC HI 20 mm² ttk 2.00 Rp 300,000.00 Rp 600,000.00
6 Instalasi Kabel Fedeer Data / LAN dari Patch Utama ke Patch Lantai
Instalasi Kabel Data / LAN UTP Cable 4 Pairs (Cat 6) dalam conduit m' 25.00 Rp 450,000.00 Rp 11,250,000.00
- PVC HI 20 mm² JUMLAH B II Rp 20,300,000.00
III Pekerjaan Instalasi Fire Alarm Semi Addressable
Lantai-01
1 Intelligent Addressable Master Control Fire Alarm bh 1.00 Rp 25,000,000.00 Rp 25,000,000.00
2 Smoke Detector Conventional bh 1.00 Rp 400,000.00 Rp 400,000.00
3 ROR Heat Detector bh 3.00 Rp 250,000.00 Rp 750,000.00
4 Zone Module bh 1.00 Rp 750,000.00 Rp 750,000.00
5 Control Module bh 4.00 Rp 1,000,000.00 Rp 4,000,000.00
6 Terminal Box Fire Alarm for 6 module (550 x 475 x 150) bh 1.00 Rp 450,000.00 Rp 450,000.00
7 Instalasi Fire Alarm Kabel NYM 2 x 1,5 mm² dalam conduit PVC HI 20 mm² ttk 4.00 Rp 300,000.00 Rp 1,200,000.00
8 Instalasi for Control Device NYM 2 X 1,5 mm² dalam conduit PVC HI 20 mm² ttk 5.00 Rp 450,000.00 Rp 2,250,000.00
9 Instalasi Looping Fire Alarm Kabel STP AWG18 1P + NYM 2 x 1,5 mm² dalam conduit PVC HI 20 mm² m' 50.00 Rp 450,000.00 Rp 22,500,000.00
JUMLAH B III Rp 57,300,000.00
IV Lantai-02
1 ROR Heat Detector bh 4.00 Rp 250,000.00 Rp 1,000,000.00
2 Zone Module bh 1.00 Rp 750,000.00 Rp 750,000.00
3 Control Module bh 2.00 Rp 1,000,000.00 Rp 2,000,000.00
4 Instalasi Fire Alarm Kabel NYM 2 x 1,5 mm² dalam conduit PVC HI 20 mm² ttk 4.00 Rp 300,000.00 Rp 1,200,000.00
5 Instalasi for Control Device NYM 2 X 1,5 mm² dalam conduit PVC HI 20 mm² ttk 3.00 Rp 450,000.00 Rp 1,350,000.00
JUMLAH B IV Rp 6,300,000.00
V Pekerjaan Instalasi CCTV
Lantai-01
Peralatan Utama
Pengadaan dan Pemasangan Peralatan Utama BGM , Berikut dengan Support, Material Bantu Sesuai Dengan
1 Spesifikasi CCTVCADVR 2016FD 6 TB ( Incl. Harddisk)
DVR Standalone unit 1.00 Rp 5,000,000.00 Rp 5,000,000.00
3 Video Distribution 2 in 16 out unit 2.00 Rp 2,000,000.00 Rp 4,000,000.00
4 Monitor LCD 32" Ex LG dan Inst Central Utama unit 2.00 Rp 1,750,000.00 Rp 3,500,000.00
5 Software dan Training Ls 1.00 Rp 2,000,000.00 Rp 2,000,000.00
6 Rack Kabinet unit 1.00 Rp 1,750,000.00 Rp 1,750,000.00
7 Instalasi Peralatan Utama ls 1.00 Rp 3,250,000.00 Rp 3,250,000.00
8 Test Dan Commisioning Ls 1.00 Rp 2,000,000.00 Rp 2,000,000.00
Pengadaan dan Pemasangan Fixtures lengkap dengan aksesoris lainnya yang dibutuhkan
9 CCTV 2MP Indoor HEL2R1 White Housing ( Dome Camera) unit 4.00 Rp 1,750,000.00 Rp 7,000,000.00
Pengadaan dan Pemasangan Instalasi Lengkap Dengan conduit PVC , T-does , Socket dan aksesoris lainnya yang
10 dibutuhkan
Instalasi Power Listrik ( NYM 2x15mm ) ttk 4.00 Rp 225,000.00 Rp 900,000.00
11 Instalasi Kabel Kamera Coaxial RG 11 ttk 4.00 Rp 300,000.00 Rp 1,200,000.00
12 Instalasi Power Listrik ( NYM 2x15mm ) dari Lantai 2 ke lantai 3 m' 250.00 Rp 22,000.00 Rp 5,500,000.00
13 Instalasi Kabel Kamera Coaxial RG 11 dari lantai 2 ke lantai 3 m' 250.00 Rp 25,000.00 Rp 6,250,000.00
JUMLAH B V Rp 42,350,000.00
VI Lantai-02
Pengadaan dan Pemasangan Fixtures lengkap dengan aksesoris lainnya yang dibutuhkan
1 CCTV 2MP Indoor HEL2R1 White Housing ( Dome Camera) unit 2.00 Rp 1,750,000.00 Rp 3,500,000.00
Pengadaan dan Pemasangan Instalasi Lengkap Dengan conduit PVC , T-does , Socket dan aksesoris lainnya yang
2 dibutuhkan
Instalasi Power Listrik ( NYM 2x15mm ) ttk 2.00 Rp 225,000.00 Rp 450,000.00
3 Instalasi Kabel Kamera Coaxial RG 11 ttk 2.00 Rp 300,000.00 Rp 600,000.00
JUMLAH B VI Rp 4,550,000.00
VII Pekerjaan Instalasi Kabel Tray
Lantai-01
1 Kabel Tray GI perforated Type C 300x3000x100 m' 23.97 Rp 230,000.00 Rp 5,513,100.00
2 Kabel Ladder GI perforated Type C 300x3000x100 m' 10.00 Rp 230,000.00 Rp 2,300,000.00
JUMLAH B VII Rp 7,813,100.00
JUMLAH (B I sd B VII Rp 143,203,100.00
C PEKERJAAN MEKANIKAL
I Pekerjaan Instalasi Air Bersih
Lantai-01
1 Pemipaan Polypropelyne ( PPR ) Class PN.10 :
- Ø 25 mm / ¾" m' 65.00 Rp 65,000.00 Rp 4,225,000.00
- Ø 32 mm / 1" m' 26.00 Rp 95,000.00 Rp 2,470,000.00
2 Gate Valve, Bronze Body, Screwed, Class 125
- Ø 32 mm / 1" bh 1.00 Rp 275,000.00 Rp 275,000.00
3 Box Kontrol Valve set 1.00 Rp 300,000.00 Rp 300,000.00
4 Pompa transfer otomatis - semi jet ( JP Basic 7 ) set 1.00 Rp 2,250,000.00 Rp 2,250,000.00
5 Tandon Air bawah kapasitas 5.000 liter set 1.00 Rp 15,000,000.00 Rp 15,000,000.00
6 Tempat Pompa uk 60 x 60 cm ls 1.00 Rp 500,000.00 Rp 500,000.00
JUMLAH .... C I Rp 25,020,000.00
II Lantai-02
1 Pemipaan Medium Galvanis Standart / SNI 07 - 0039 -87 :
- Ø 25 mm / 1” m' 15.00 Rp 55,000.00 Rp 825,000.00
- Ø 50 mm / 2” m' 6.00 Rp 115,000.00 Rp 690,000.00
2 Pompa booster stainless steel otomatis ( CH4-60) set 2.00 Rp 7,500,000.00 Rp 15,000,000.00
Kapasitas = 70 liter/menit, Head = 40 meter
3 Gate Valve, Bronze Body, Screwed, Class 125
- Ø 32 mm / 1" bh 6.00 Rp 325,000.00 Rp 1,950,000.00
3 Check Valve, Bronze Body, Screwed, Class 125
- Ø 32 mm / 1" bh 3.00 Rp 300,000.00 Rp 900,000.00
4 Strainer, Bronze Body, Screwed, Class 125
- Ø 32 mm / 1" bh 2.00 Rp 1,200,000.00 Rp 2,400,000.00
5 Rubber Fleksible Joint 10 Bar Union Screwed Double
- Ø 32 mm / 1" bh 4.00 Rp 975,000.00 Rp 3,900,000.00
6 Floating Valve, Bronze Body, Screwed, Class 125
- Ø 50 mm / 2” bh 2.00 Rp 1,600,000.00 Rp 3,200,000.00
7 Tandon Atas Kap. 2.200 ltr set 2.00 Rp 5,500,000.00 Rp 11,000,000.00
JUMLAH .... C II Rp 39,865,000.00
III Pekerjaan Instalasi Air Bekas, Kotor & Vent
Lantai-01
1 Pemipaan PVC AW Kelas 10 kg/cm² :
- Ø 40 mm / 1¼" m' 39.38 Rp 40,000.00 Rp 1,575,200.00
- Ø 76 mm / 2 ½” m' 11.50 Rp 75,000.00 Rp 862,500.00
- Ø 89 mm / 3” m' 25.38 Rp 95,000.00 Rp 2,411,100.00
- Ø 114 mm / 4” m' 26.50 Rp 125,000.00 Rp 3,312,500.00
2 Floor Clean Out Ø 89 mm / 3” set 2.00 Rp 350,000.00 Rp 700,000.00
3 Septic Tank Bio Filter Kap.3.000 liter bh 1.00 Rp 6,000,000.00 Rp 6,000,000.00
4 Peresapan bh 1.00 Rp 2,500,000.00 Rp 2,500,000.00
JUMLAH .... C III Rp 17,361,300.00
IV Pekerjaan Instalasi Tata Udara ( AC )
Lantai-01
1 Peralatan Utama AC lengkap c/w Pemipaan HVAC ( Cu ) Type ASTM B280 :
- AC Cassete Standard Class 12.000 btu/H Wireless unit 1.00 Rp 8,000,000.00 Rp 8,000,000.00
- AC Cassete Standard Class 18.000 btu/H Wireless unit 1.00 Rp 12,000,000.00 Rp 12,000,000.00
2 Instalasi AC, NYM 3 x 2,5 mm² dalam conduit PVC HI 20 mm² ttk 2.00 Rp 300,000.00 Rp 600,000.00
3 Pemipaan drainage AC Wall Mounted Single Split , PVC AW lengkap dengan isolasi aeroflex ttk 2.00 Rp 250,000.00 Rp 500,000.00
JUMLAH .... C IV Rp 21,100,000.00
V Lantai-02
1 Peralatan Utama AC lengkap c/w Pemipaan HVAC ( Cu ) Type ASTM B280 :
- AC Cassete Standard Class 24.000 btu/H Wireless unit 2.00 Rp 20,000,000.00 Rp 40,000,000.00
- AC Cassete Standard Class 28.000 btu/H Wireless unit 1.00 Rp 22,000,000.00 Rp 22,000,000.00
2 Instalasi AC, NYM 3 x 2,5 mm² dalam conduit PVC HI 20 mm² ttk 3.00 Rp 300,000.00 Rp 900,000.00
3 Pemipaan drainage AC Wall Mounted Single Split , PVC AW lengkap dengan isolasi aeroflex ttk 3.00 Rp 250,000.00 Rp 750,000.00
JUMLAH .....C V Rp 63,650,000.00
VI Pekerjaan Hydrant
Lantai-01
1 Box Fire Extingusher ( tertanam tembok) bh 5.00 Rp 750,000.00 Rp 3,750,000.00
2 Fire Extinguisher Dry Chemical kap. 3 kg + Aksesoris bh 5.00 Rp 650,000.00 Rp 3,250,000.00
JUMLAH ..... C VI Rp 7,000,000.00
VII Lantai-02
1 Box Fire Extingusher ( tertanam tembok) bh 2.00 Rp 750,000.00 Rp 1,500,000.00
2 Fire Extinguisher Dry Chemical kap. 3 kg + Aksesoris bh 2.00 Rp 650,000.00 Rp 1,300,000.00
JUMLAH .....C VII Rp 2,800,000.00
JUMLAH Rp 176,796,300.00
2 PEKERJAAN PEMBANGUNAN GEDUNG KULIAH TEKNIK MESIN ALAT BERAT (TMAB) (C I s/d C VII)
21 PEKERJAAN ARSITEK (STANDART)
A PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi Kerja ls 1.00 Rp 5,000,000.00 Rp 5,000,000.00
2 Pembuatan Pagar seng Proyek keliling tinggi 2 meter ls 1.00 Rp 12,000,000.00 Rp 12,000,000.00
3 Pembuatan spanduk banner proyek m2 120.00 Rp 45,000.00 Rp 5,400,000.00

JUMLAH. A Rp 22,400,000.00
B PEKERJAAN PASANGAN DINDING
I LANTAI SATU
1 Pasangan dinding bata ringan m² 16.20 Rp 168,866.13 Rp 2,735,631.30
2 Plesteran (semen instan) m² 32.40 Rp 92,949.04 Rp 3,011,548.82
3 Acian (semen instan) m² 32.40 Rp 36,482.72 Rp 1,182,039.97
4 Benangan sudut m 60.00 Rp 19,156.04 Rp 1,149,362.33
5 Benangan Opening Kusen Pintu & Jendela m' 22.60 Rp 19,156.04 Rp 432,926.48
6 Kolom praktis 10 x 10 m³ 0.02 Rp 5,881,668.99 Rp 117,633.38
7 Balok latei 12 x 10 m³ 0.03 Rp 8,850,953.29 Rp 265,528.60
8 Pekerjaan Plat Tangga Entrance m³ 16.84 Rp 5,547,646.23 Rp 93,422,362.54
9 Pekerjaan Pasir Urug Tangga Entrance m³ 24.32 Rp 147,742.80 Rp 3,593,104.90
10 Perbaikan Ruang Pantry & Ruang Panel m² 6.90 Rp 168,866.13 Rp 1,165,176.29
JUMLAH. B I Rp 107,075,314.59
II LANTAI DUA
1 Perbaikan Ruang Pantry & Ruang Panel m² 6.90 Rp 168,866.13 Rp 1,165,176.29
JUMLAH. B II Rp 1,165,176.29
III LANTAI TIGA
1 Pasangan dinding bata ringan m² 921.71 Rp 168,866.13 Rp 155,645,600.11
2 Plesteran (semen instan) m² 1,843.42 Rp 92,949.04 Rp 171,344,114.71
3 Acian (semen instan) m² 1,843.42 Rp 36,482.72 Rp 67,252,966.49
4 Benangan sudut m 1,672.78 Rp 19,156.04 Rp 32,043,838.50
5 Benangan Opening Kusen Pintu & Jendela m' 851.90 Rp 19,156.04 Rp 16,319,029.41
6 Kolom praktis 10 x 10 m³ 4.09 Rp 5,881,668.99 Rp 24,056,026.18
7 Balok latei 12 x 10 m³ 2.25 Rp 8,850,953.29 Rp 19,914,644.91
8 Ring Balok 15 x 10 m³ 4.27 Rp 6,251,878.90 Rp 26,695,522.92
9 Acian Beton Kolom m² 459.38 Rp 36,482.72 Rp 16,759,429.62
10 Meja beton T.8 cm m3 0.22 Rp 5,453,944.70 Rp 1,199,867.83
11 Pemasangan Tangga monyet + Tutup Manhole bh 2.00 Rp 5,547,646.23 Rp 11,095,292.46
JUMLAH. B III Rp 542,326,333.14
IV LANTAI ATAP
1 Pasangan dinding bata ringan m² 312.06 Rp 168,866.13 Rp 52,696,364.33
2 Plesteran (semen instan) m² 312.06 Rp 92,949.04 Rp 29,005,676.64
3 Acian (semen instan) m² 312.06 Rp 36,482.72 Rp 11,384,796.04
4 Kolom praktis 10 x 10 m³ 0.52 Rp 5,881,668.99 Rp 3,058,467.88
5 Ring balok 12 x 15 m³ 1.87 Rp 6,251,878.90 Rp 11,691,013.55
JUMLAH. B IV Rp 107,836,318.44
JUMLAH. Rp 758,403,142.46
C PEKERJAAN PELAPIS LANTAI DAN DINDING ( BI+BII+BIII+BIV)
I LANTAI SATU
1 Lantai Homogenous Tile. Uk. 60 x 60 (HT-3 ) (Lobby tengah) m² 584.91 Rp 295,895.03 Rp 173,071,961.27
2 Lantai Ceramic Tile Uk 30 x 30 (CT-3 UP) Toilet m² 4.90 Rp 124,239.85 Rp 608,775.25
3 Lantai Homogenous Tile. Uk. 60 x 60 (HT-3 UP) (teras) m² 165.19 Rp 295,895.03 Rp 48,878,899.80
4 Pola Motif lantai (Granit tile) unit 1.00 Rp 25,000,000.00 Rp 25,000,000.00
5 Plin Homogenous tile uk.10 x60 (HT-3) m' 440.88 Rp 133,929.66 Rp 59,046,909.05
JUMLAH. C I Rp 306,606,545.37
II LANTAI DUA
1 Lantai Keramik. Uk. 30 x 30 Unpolish (CT-3-UP) Toilet m² 47.57 Rp 124,239.85 Rp 5,910,089.55
2 Lantai Keramik Tile. Uk. 30 x 30 Unpolish Trap Tangga (stepnosing) m' 80.16 Rp 84,766.27 Rp 6,794,864.20
3 Lantai Keramik Tile. Uk. 20 x 30 Unpolish Plin trap Tangga m' 80.16 Rp 84,766.27 Rp 6,794,864.20
4 Lantai Keramik Bordes. Uk. 30 x 30 Unpolish (CT-3-UP) m² 15.00 Rp 83,979.35 Rp 1,259,690.31
5 Dinding Keramik. Uk. 30 x 40 m² 140.22 Rp 243,566.55 Rp 34,152,901.64
6 Lantai Homogenous Tile. Uk. 60 x 60 (HT-3 UP) (Pantry) m² 5.50 Rp 295,895.03 Rp 1,627,422.66
7 Waterprofing coating m² 47.57 Rp 55,550.00 Rp 2,642,513.50
8 Plin Homogenous tile uk.10 x60 (HT-3) m' 566.28 Rp 133,929.66 Rp 75,841,688.57
JUMLAH. C II Rp 135,024,034.63
III LANTAI TIGA
1 Lantai Keramik. Uk. 30 x 30 Unpolish (CT-3-UP) Toilet m² 47.57 Rp 124,239.85 Rp 5,910,089.55
2 Dinding Keramik. Uk. 30 x 40 m² 140.22 Rp 243,566.55 Rp 34,152,901.64
3 Lantai Homogenous Tile. Uk. 60 x 60 (HT-3 UP) m² 1,111.55 Rp 295,895.03 Rp 328,902,119.21
4 Waterprofing coating m² 47.57 Rp 55,550.00 Rp 2,642,513.50
5 Cordrile Plat beton plumbing ttk 12.00 Rp 150,000.00 Rp 1,800,000.00
6 Plin Homogenous tile uk.10 x60 (HT-3) m' 523.28 Rp 133,929.66 Rp 70,082,713.14
JUMLAH. C III Rp 443,490,337.03
IV LANTAI ATAP
1 Screed Lantai m² 1,604.40 Rp 56,475.03 Rp 90,608,544.15
2 Water Proofing Membrane m² 1,604.40 Rp 151,500.00 Rp 243,066,600.00
JUMLAH. C IV Rp 333,675,144.15
V FAÇADE
1. Pekerjaan Finishing Dinding
a. Sun Louvre
Sisi Depan
Sun louvre Hunter Douglas Luxalon 84R m² 30.05 Rp 2,684,675.00 Rp 80,674,483.75
Sisi Kanan
Sun louvre Hunter Douglas Luxalon 84R m² 188.64 Rp 2,684,675.00 Rp 506,437,092.00
Sisi Belakang
Sun louvre Hunter Douglas Luxalon 84R m² 15.20 Rp 2,684,675.00 Rp 40,807,060.00
Sisi Kiri
Sun louvre Hunter Douglas Luxalon 84R m² 147.33 Rp 2,684,675.00 Rp 395,533,167.75
b. Railling holoow
Sisi Depan m' 36.95 Rp 846,496.03 Rp 31,278,028.12
Sisi Belakang m' 22.73 Rp 846,496.03 Rp 19,240,854.65
Sisi Kiri m' 59.15 Rp 846,496.03 Rp 50,070,239.88
Sisi Kanan m' 71.40 Rp 846,496.03 Rp 60,439,816.19
Cover Kolom ( Plat stainless steel hair line T.2 mm R. m' 146.30 Rp 846,496.03 Rp 123,842,368.46
d.
e. 45 cmStainless
Huruf ) Steel t. 2mm
Huruf Stainless Steel T. 30cm "POLTERA" unit 1.00 Rp 3,675,000.00 Rp 3,675,000.00
Huruf Stainless Steel T. 50cm "GEDUNG" unit 1.00 Rp 3,150,000.00 Rp 3,150,000.00
Huruf Stainless Steel T. 100cm "B" unit 1.00 Rp 1,200,000.00 Rp 1,200,000.00
Huruf Timbul Arcrylic T. 75cm "POLITEKNIK NEGERI MADURA" unit 1.00 Rp 10,000,000.00 Rp 10,000,000.00
Logo POLTERA T. 75 cm bh 1.00 Rp 5,000,000.00 Rp 5,000,000.00
JUMLAH. C V Rp 1,331,348,110.79
JUMLAH. Rp 2,550,144,171.97
D PEKERJAAN PASANGAN PLAFOND (CI+CII+CIII+CIV+CV
)
I LANTAI SATU
1 Gypsum (GP-1) Gudang m² 21.10 Rp 127,759.19 Rp 2,695,718.96
2 Calsiboard m² 4.90 Rp 139,850.41 Rp 685,267.00
3 Gypsum (GP-1) Penutup Rangka Plafond m² 1,315.58 Rp 127,759.19 Rp 168,077,438.47
4 Pekerjaan Rangka Plafond Gypsum ( Perbaikan) m² 263.12 Rp 63,879.60 Rp 16,807,999.37
JUMLAH. D I Rp 188,266,423.79
II LANTAI DUA
1 Gypsum (GP-1) Penutup Rangka Plafond m² 1,166.00 Rp 127,759.19 Rp 148,967,218.46
2 Pekerjaan Rangka Plafond Gypsum ( Perbaikan) m² 233.20 Rp 63,879.60 Rp 14,896,721.85
3 Calsiboard m² 47.57 Rp 139,850.41 Rp 6,652,683.88
JUMLAH. D II Rp 170,516,624.19
III LANTAI TIGA
1 Plafond Akustik uk 60 x 120 m² 1,111.55 Rp 309,254.02 Rp 343,751,307.04
2 Calsiboard m² 47.57 Rp 139,850.41 Rp 6,652,683.88
JUMLAH. D III Rp 350,403,990.93
JUMLAH. Rp 709,187,038.91
E PEKERJAAN PINTU DAN JENDELA (DI+DII+DIII
I LANTAI SATU
a PINTU ALUMUNIUM
1 Pintu Type B-1 unit 6.00 Rp 4,500,000.00 Rp 27,000,000.00
2 Pintu Type E2-A unit 2.00 Rp 4,000,000.00 Rp 8,000,000.00
3 Pintu Type E2 unit 2.00 Rp 4,200,000.00 Rp 8,400,000.00
4 Pintu Type C unit 2.00 Rp 3,500,000.00 Rp 7,000,000.00
5 Pintu Type C1 unit 1.00 Rp 10,511,000.00 Rp 10,511,000.00
6 Pintu Type S unit 12.00 Rp 3,500,000.00 Rp 42,000,000.00
b JENDELA ALUMUNIUM
7 JENDELA CW 1 Unit 2.00 Rp 45,521,951.76 Rp 91,043,903.51
8 Daun Pintu Double Steel Door Ruang Panel A2HM unit 1.00 Rp 15,150,000.00 Rp 15,150,000.00
9 Tralis besi nako t=10mm m² 128.84 Rp 299,575.00 Rp 38,597,243.00
JUMLAH. E I Rp 247,702,146.51
II LANTAI DUA
a PINTU ALUMUNIUM
1 Daun Pintu Type B-1 unit 5.00 Rp 4,500,000.00 Rp 22,500,000.00
2 Daun Pintu Type C unit 2.00 Rp 3,500,000.00 Rp 7,000,000.00
3 Perbaikan Aksesoris Pintu Ls 1.00 Rp 10,511,000.00 Rp 10,511,000.00
3 Daun Pintu Double Steel Door Ruang Panel A2HM unit 1.00 Rp 15,150,000.00 Rp 15,150,000.00
3 Daun Pintu Type S unit 11.00 Rp 3,500,000.00 Rp 38,500,000.00
b JENDELA ALUMUNIUM
1 Type PS-1 unit 2.00 Rp 3,500,000.00 Rp 7,000,000.00
2 Tralis besi nako t=10mm m² 123.81 Rp 299,575.00 Rp 37,090,380.75
JUMLAH. E II Rp 137,751,380.75
III LANTAI TIGA
a PINTU ALUMUNIUM
1 Pintu Type B-1 unit 5.00 Rp 4,500,000.00 Rp 22,500,000.00
2 Pintu Type C unit 2.00 Rp 3,500,000.00 Rp 7,000,000.00
3 Pintu Type S unit 12.00 Rp 3,500,000.00 Rp 42,000,000.00
4 Pintu Type E1 unit 4.00 Rp 4,200,000.00 Rp 16,800,000.00
5 Daun Pintu Double Steel Door Ruang Panel A2HM unit 1.00 Rp 15,150,000.00 Rp 15,150,000.00
b JENDELA ALUMUNIUM
1 Type J-3 unit 4.00 Rp 2,500,000.00 Rp 10,000,000.00
2 Type J-4 unit 19.00 Rp 2,800,000.00 Rp 53,200,000.00
3 Type BV-3 unit 2.00 Rp 1,250,000.00 Rp 2,500,000.00
4 Type BVB unit 11.00 Rp 1,250,000.00 Rp 13,750,000.00
5 Type PS-1 unit 2.00 Rp 3,500,000.00 Rp 7,000,000.00
6 Type BVA unit 1.00 Rp 1,500,000.00 Rp 1,500,000.00
7 Tralis besi nako t=10mm m² 123.81 Rp 299,575.00 Rp 37,090,380.75
JUMLAH. E III Rp 228,490,380.75
JUMLAH. E (E I+E Rp 613,943,908.01
F PEKERJAAN SANITAIR II+E III)
I LANTAI SATU (Toilet Difable)
1 Closet Duduk Lengkap Asccories unit 1.00 Rp 3,400,471.28 Rp 3,400,471.28
2 Wastafel Wallhung unit 1.00 Rp 1,944,258.08 Rp 1,944,258.08
3 Shower spray set 1.00 Rp 350,546.51 Rp 350,546.51
4 Grab Bar Swing set 2.00 Rp 750,000.00 Rp 1,500,000.00
5 Tissue holder bh 1.00 Rp 105,760.38 Rp 105,760.38
6 Foor Drain bh 1.00 Rp 361,238.12 Rp 361,238.12
JUMLAH. F I Rp 7,662,274.37
II LANTAI DUA
1 Closet Duduk Lengkap Asccories unit 4.00 Rp 3,400,471.28 Rp 13,601,885.13
2 Wastafel Under Counter Lengkap Accessories (Meja, kran, tempat sabun) unit 4.00 Rp 1,506,616.50 Rp 6,026,465.98
3 Closet Jongkok Lengkap Asccories unit 4.00 Rp 1,006,962.43 Rp 4,027,849.70
4 Kaca Cermin Bevel bh 4.00 Rp 772,171.01 Rp 3,088,684.03
5 Cove Lampu di atas Wastafel set 4.00 Rp 352,253.91 Rp 1,409,015.65
6 Top Table Granit Alam m² 3.33 Rp 1,068,893.61 Rp 3,559,415.70
7 Shower spray set 4.00 Rp 350,546.51 Rp 1,402,186.03
8 Tissue holder bh 4.00 Rp 105,760.38 Rp 423,041.53
9 Cubical toilet ( L ) unit 6.00 Rp 2,090,700.00 Rp 12,544,200.00
10 Cubical toilet ( I ) bh 2.00 Rp 2,090,700.00 Rp 4,181,400.00
11 Urinoir bh 4.00 Rp 2,392,486.74 Rp 9,569,946.95
12 Partition urinoir set 4.00 Rp 492,017.21 Rp 1,968,068.83
13 Kitcen sink m² 1.00 Rp 1,711,394.75 Rp 1,711,394.75
14 Kran sink m² 1.00 Rp 627,715.25 Rp 627,715.25
15 Foor Drain bh 9.00 Rp 361,238.12 Rp 3,251,143.04
16 Kran bh 8.00 Rp 612,110.50 Rp 4,896,884.00
JUMLAH. F II Rp 72,289,296.57
III LANTAI TIGA
1 Closet Duduk Lengkap Asccories unit 4.00 Rp 3,400,471.28 Rp 13,601,885.13
2 Wastafel Under Counter Lengkap Accessories (Meja,kran,tempat sabun) unit 4.00 Rp 1,506,616.50 Rp 6,026,465.98
3 Closet Jongkok Lengkap Asccories unit 4.00 Rp 1,006,962.43 Rp 4,027,849.70
4 Kaca Cermin Bevel bh 4.00 Rp 772,171.01 Rp 3,088,684.03
5 Cove Lampu di atas Wastafel set 4.00 Rp 352,253.91 Rp 1,409,015.65
6 Top Table Granit Alam m² 3.33 Rp 1,068,893.61 Rp 3,559,415.70
7 Shower spray set 4.00 Rp 350,546.51 Rp 1,402,186.03
8 Tissue holder bh 4.00 Rp 105,760.38 Rp 423,041.53
9 Cubical toilet ( L ) unit 6.00 Rp 2,090,700.00 Rp 12,544,200.00
10 Cubical toilet ( I ) bh 2.00 Rp 2,090,700.00 Rp 4,181,400.00
11 Urinoir bh 4.00 Rp 2,392,486.74 Rp 9,569,946.95
12 Partition urinoir set 4.00 Rp 492,017.21 Rp 1,968,068.83
13 Kitcen sink m² 1.00 Rp 1,711,394.75 Rp 1,711,394.75
14 Kran sink m² 1.00 Rp 627,715.25 Rp 627,715.25
15 Foor Drain bh 8.00 Rp 361,238.12 Rp 2,889,904.92
16 Kran bh 4.00 Rp 612,110.50 Rp 2,448,442.00
JUMLAH. F III Rp 69,479,616.46
JUMLAH. F Rp 149,431,187.40
G PEKERJAAN PENGECATAN DINDING DAN PLAFOND (FI+FII+FIII)
I
a. Pengecatan dinding
1 Interior Emulsion (P-1) m² 2,144.50 Rp 37,963.63 Rp 81,412,999.17
2 Exterior Weathershield (P-7) m² 531.20 Rp 56,547.63 Rp 30,038,099.73
b. Pengecatan plafond
1 Gypsum (P-1) m² 21.10 Rp 37,963.63 Rp 801,032.54
2 Calsiboard (P-1) m² 263.12 Rp 37,963.63 Rp 9,988,989.67
JUMLAH. GI Rp 122,241,121.11
II
a. Pengecatan dinding
1 Interior Emulsion (P-1) m² 2,144.50 Rp 37,963.63 Rp 81,412,999.17
2 Exterior Weathershield (P-7) m² 456.90 Rp 56,547.63 Rp 25,836,611.00
a. Pengecatan plafond
1 Gypsum (P-1) m² 1,166.00 Rp 37,963.63 Rp 44,265,589.67
2 Calsiboard (P-1) m² 47.57 Rp 37,963.63 Rp 1,805,929.76
JUMLAH. G II Rp 153,321,129.60
III
a. Pengecatan dinding
1 Interior Emulsion (P-1) m² 2,144.90 Rp 37,963.63 Rp 81,428,184.62
2 Exterior Weathershield (P-7) m² 456.90 Rp 56,547.63 Rp 25,836,611.00
b. Pengecatan plafond
1 Calsiboard (P-1) m² 47.57 Rp 37,963.63 Rp 1,805,929.76
JUMLAH. G III Rp 109,070,725.39
IV
a. Pengecatan dinding
1 Exterior Weathershield ( P-7 ) m² 312.06 Rp 56,547.63 Rp 17,646,252.64
b. Pengecatan plafond
1 Calsiboard (P-7) m² 158.11 Rp 37,963.63 Rp 6,002,429.14
JUMLAH. G IV Rp 23,648,681.78
JUMLAH. G Rp 408,281,657.88
H PEKERJAAN ATAP (GI+GII+GIII+GIV)
a. Penutup atap Membrane m² 585.00 Rp 1,400,000.00 Rp 819,000,000.00
Material: - Membrane Ferrari 702
- Pipa Hitam dia. 4"
- Rel alumunium
- Meni + Duco

JUMLAH H Rp 819,000,000.00
I PEKERJAAN RAILLING
I
1 Perbaikan Poles Railling Tangga ls 1.00 Rp 15,000,000.00 Rp 15,000,000.00
JUMLAH I.I Rp 15,000,000.00
II
1 Railling tangga stainless m' 16.68 Rp 2,258,121.03 Rp 37,665,458.70
2 Hand Railling tangga stainless ø 3" m' 25.68 Rp 1,025,065.73 Rp 26,323,687.82
3 Hand Railling void stainless ø 2.5" m' 83.43 Rp 1,025,065.73 Rp 85,521,233.44
JUMLAH I.II Rp 149,510,379.95
III
1 Hand Railling void stainless ø 2.5" m' 83.43 Rp 1,025,065.73 Rp 85,521,233.44
JUMLAH I.III Rp 85,521,233.44
JUMLAH I Rp 250,031,613.39
J PEKERJAAN LANDSCAPE (I.I+I.II+I.III)
I
1 Pekerjaan Paving Stone tebal 8 cm, K-400 m² 2,669.14 Rp 126,250.00 Rp 336,978,925.00
2 Pekerjaan Pasir urug Bawah Paving tebal 10cm m² 266.91 Rp 147,742.80 Rp 39,434,030.75
3 Pekerjaan Kanstin K-250 m 647.68 Rp 84,840.00 Rp 54,949,171.20
JUMLAH J I Rp 431,362,126.95
II
1 Pohon Pule dia min.15 cm tinggi 3m bh 5.00 Rp 1,000,000.00 Rp 5,000,000.00
2 Pohon Ketapang kencana dia min.15 cm tinggi 3m bh 10.00 Rp 750,000.00 Rp 7,500,000.00
3 Pohon Tabepuya bunga warna Kuning dia min.15 cm tinggi 3m bh 10.00 Rp 500,000.00 Rp 5,000,000.00
4 Pohon Tabepuya bunga warna Pink dia min.15 cm tinggi 3m bh 10.00 Rp 1,200,000.00 Rp 12,000,000.00
5 Pohon Tabepuya bunga warna Putih dia min.15 cm tinggi 3m bh 10.00 Rp 1,100,000.00 Rp 11,000,000.00
6 Rumput gajah mini m2 300.00 Rp 12,500.00 Rp 3,750,000.00
7 Tanah taman termasuk humus m3 80.58 Rp 90,000.00 Rp 7,252,200.00
8 Galian tanah untuk tanaman m3 80.58 Rp 90,597.00 Rp 7,300,306.26
JUMLAH J II Rp 58,802,506.26
III SELASAR
1 Pekerjaan Tanah Urug Bawah Paving m3 13.73 Rp 147,742.80 Rp 2,028,508.64
2 Lantai Kerja Bawah Pondasi m3 4.31 Rp 996,738.90 Rp 4,295,944.66
3 Pasir Urug Bawah Pondasi m3 11.26 Rp 147,742.80 Rp 1,663,583.93
4 Galian Tanah Pondasi m3 343.20 Rp 90,597.00 Rp 31,092,890.40
5 Urugan Tanah Kembali Pondasi m3 326.01 Rp 30,199.00 Rp 9,845,175.99
6 Pekerjaan Pondasi Plat Setempat uk 130x130x25 m3 17.19 Rp 4,424,622.72 Rp 76,059,264.48
7 Pekerjaan Sloof Uk 25x40 m3 13.13 Rp 4,165,135.09 Rp 54,688,223.76
8 Pekerjaan Kolom Uk. 30x30 m3 5.94 Rp 6,163,285.74 Rp 36,609,917.28
9 Pekerjaan Kolom H Beam 125.125.6,5.9 Finish Cat kg 2,149.77 Rp 34,554.63 Rp 74,284,496.19
10 Pekerjaan Balok IWF 150.75.5.7 Finish Cat kg 1,838.76 Rp 34,554.63 Rp 63,537,662.27
11 Pekerjaan Balok IWF 100.50.5.7 Finish Cat kg 677.60 Rp 34,554.63 Rp 23,414,213.90
12 Pemasangan Plat Besi t 10 mm Finish Cat m² 2.75 Rp 550,000.00 Rp 1,512,500.00
13 Pemasangan Plat Besi t 12 mm Finish Cat m² 2.20 Rp 600,000.00 Rp 1,320,000.00
14 Pemasangan Anchor dia. 16 mm bh 528.00 Rp 55,000.00 Rp 29,040,000.00
15 Pemasangan Anchor dia. 19 mm bh 176.00 Rp 75,000.00 Rp 13,200,000.00
16 Gording C 100.50.20.3,2 Finish Cat kg 1,805.93 Rp 34,554.63 Rp 62,403,233.93
17 Atap UPVC m2 217.37 Rp 550,000.00 Rp 119,553,500.00
18 Pekerjaan Kansteen m' 131.34 Rp 84,840.00 Rp 11,142,885.60
19 Pekerjaan Paving Stone tebal 6 cm, K-300 m2 137.34 Rp 126,250.00 Rp 17,339,175.00
20 Lampu outbow 8W bh 22.00 Rp 75,000.00 Rp 1,650,000.00
JUMLAH J III Rp 634,681,176.02
IV PEKERJAAN SUMUR BOR DAN TANDON
1 Pek. Bor Sumur m1 120.00 Rp 1,200,000.00 Rp 144,000,000.00
2 Pas. Pipa PVC Ø 2 "AW Hisap sumur m1 100.00 Rp 65,000.00 Rp 6,500,000.00
3 Pas. Pipa PVC Ø 4 " AW Chasing sumur m1 120.00 Rp 125,000.00 Rp 15,000,000.00
4 Pas. Pipa PVC Ø 2 " AW m1 175.00 Rp 65,000.00 Rp 11,375,000.00
5 Pompa Sub Sumersible daya 1,5 Kw 2 HP 1 phase, kapasitas daya dorong max 131 m, outlet 1 1/2 ich bh 1.00 Rp 5,000,000.00 Rp 5,000,000.00
6 Ground Water Tank + R. Pompa beton bertulang tebal = 12 cm, Fc = 26,4 Mpa, finish keramik dinding, ukuran 4x5x2,5 unit 1.00 Rp 48,000,000.00 Rp 48,000,000.00
7mPompa semi jet pump Type JPC 3, Output : 850 watt, Input start : 600 watt, daya hisap : 11 meter, Daya dorong : 45
meter (max), total head : 56 meter, debit air : 2 m3/jam, bh 2.00 Rp 2,000,000.00 Rp 4,000,000.00

8 Pasang Pipa Air Bersih AW diam. 1 1/2" Sprinkler dan kran Taman M' 300.00 Rp 55,000.00 Rp 16,500,000.00
9 Pemasangan Kran 3/4 untuk penyiraman tanaman Bh 30.00 Rp 75,000.00 Rp 2,250,000.00

JUMLAH J IV Rp 252,625,000.00
JUMLAH J Rp 1,377,470,809.22
K PEKERJAAN SALURAN DAN RABATAN (J.I+J.II+J.III+J.IV)
I SALURAN KELILING GEDUNG
1 U-ditch 40X50 tebal 8CM, K-350 unit 208.33 Rp 410,679.58 Rp 85,556,876.81
2 Galian tanah saluran m3 75.00 Rp 90,597.00 Rp 6,794,775.00
3 Lantai kerja tebal 5cm bawah U-ditch m3 5.00 Rp 996,738.90 Rp 4,983,694.50
4 Bak kontrol 60X60 cm bh 18.00 Rp 207,000.00 Rp 3,726,000.00
5 Cover Penutup U-ditch, K-350 unit 416.67 Rp 205,339.79 Rp 85,558,930.21
6 Rabatan Keliling Gedung K-175 tebal 8 cm m3 20.00 Rp 996,738.90 Rp 19,934,778.01
7 Tulangan wiremesh M8 untuk Rabatan m2 250.00 Rp 2,508,353.39 Rp 627,088,347.11
8 Kansteen sepatu pinggir rabatan m' 250.00 Rp 203,616.00 Rp 50,904,000.00
JUMLAH K Rp 884,547,401.64
2.2 PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
A PEKERJAAN ELEKTRIKAL
I Pekerjaan Panel
1 PL-02, Panel Pembagi Penerangan & Tenaga Lantai - 02 Unit 1.00 Rp 54,842,925.00 Rp 54,842,925.00
2 PL-03, Panel Pembagi Penerangan & Tenaga Lantai - 03 Unit 1.00 Rp 31,931,475.00 Rp 31,931,475.00
3 P.PB, Panel Pembagi Pompa Booster Unit 1.00 Rp 31,931,475.00 Rp 31,931,475.00
JUMLAH A I Rp 118,705,875.00
II Instalasi Kabel Feeder Instalasi Tegangan Rendah
1 Dari Panel MDP ke PL-02
Kabel TR, NYY 4 x 4 mm² + NYA 1 x 2,5 mm² m' 35.00 Rp 95,000.00 Rp 3,325,000.00
2 Dari Panel MDP ke PL-03
Kabel TR, NYY 4 x 4 mm² + NYA 1 x 2,5 mm² m' 45.00 Rp 95,000.00 Rp 4,275,000.00
3 Dari Panel MDP ke P.PB
Kabel TR, NYY 4 x 4 mm² + NYA 1 x 2,5 mm² m' 55.00 Rp 95,000.00 Rp 5,225,000.00
4 Penambahan Daya PLN 11.000 watt ls 1.00 Rp 15,400,000.00 Rp 15,400,000.00

JUMLAH A II Rp 28,225,000.00
III Pekerjaan Instalasi Penerangan
Lampu penerangan jalan umum (PJU)
1 Lampu PJU (DOUBLE ARM)
- Pekerjaan Lampu PJU Oktagonal 7m lengan (double) 1,5 meter bh 25.00 Rp 5,500,000.00 Rp 137,500,000.00
- Pekerjaan pemasangan kabel NYFGBY ukuran 4 X 6 mm m' 635.00 Rp 80,000.00 Rp 50,800,000.00
- Box Panel 50x50 tahan cuaca termasuk timer (komplit) bh 2.00 Rp 1,200,000.00 Rp 2,400,000.00
Lampu LED lokal ISO 9001, 60 watt standart SNI, Life time 50.000 Hours, bh 50.00 Rp 3,000,000.00 Rp 150,000,000.00
-- Outdoor
PekerjaanIP pondasi
65 lampu beton bertulang Fc = 26,4 Mpa, (K-225) m3 13.16 Rp 6,008,679.03 Rp 79,074,216.04
- Pekerjaan Instalasi dan Pemasangan Lampu Penerangan Jalan titik 25.00 Rp 1,650,000.00 Rp 41,250,000.00
- Pekerjaan Galian Tanah Pondasi m3 137.46 Rp 90,597.00 Rp 12,453,463.62

2 Lampu PJU (SINGLE ARM)


- Pekerjaan Lampu PJU Oktagonal 7m lengan (Single) 1,5 meter bh 33.00 Rp 4,700,000.00 Rp 155,100,000.00
- Pekerjaan pemasangan kabel NYFGBY ukuran 4 X 6 mm m' 350.00 Rp 80,000.00 Rp 28,000,000.00
- Box Panel 50x50 tahan cuaca termasuk timer (komplit) bh 2.00 Rp 1,200,000.00 Rp 2,400,000.00
Lampu LED lokal ISO 9001, 60 watt standart SNI, Life time 50.000 Hours, bh 33.00 Rp 3,000,000.00 Rp 99,000,000.00
-- Outdoor IP pondasi
Pekerjaan 65 lampu beton bertulang Fc = 26,4 Mpa, (K-225) m3 17.37 Rp 6,008,679.03 Rp 104,370,754.76
- Pekerjaan Instalasi dan Pemasangan Lampu Penerangan Jalan titik 33.00 Rp 1,650,000.00 Rp 54,450,000.00
- Pekerjaan Galian Tanah Pondasi m3 78.93 Rp 90,597.00 Rp 7,150,821.21
JUMLAH A III Rp 923,949,255.63
IV Pekerjaan Elektrikal Lantai-02
1 Armature lampu :
Lampu Baret SCB 20 ACR Led Basic Plat 22 W + Battery Emergency bh 2.00 Rp 450,000.00 Rp 900,000.00
-- BoxLampu Down Light RD 125 E 27 Leb Bulb 4 w Cover Glass bh 8.00 Rp 135,000.00 Rp 1,080,000.00
- Lampu Down Light RD 150 E 27 Leb Bulb 8 w Cover Glass bh 6.00 Rp 250,000.00 Rp 1,500,000.00
- Lampu Down Light Comport 150-75 Led DLS 13,6 - 1200lm bh 80.00 Rp 550,000.00 Rp 44,000,000.00
- Lampu RM 300 2x36 M2 T- Led Esential - 2x14,5 W 3200lm bh 16.00 Rp 750,000.00 Rp 12,000,000.00
- Lampu RM 300 2x36 ACR T- Led Esential 2x14,5 W 3200lm bh 32.00 Rp 750,000.00 Rp 24,000,000.00
- Emergency Kit c/w Battery & Charge Min. 2 Hours Backup bh 23.00 Rp 1,200,000.00 Rp 27,600,000.00
2 Peralatan Instalasi :
- Saklar 1 Gang 1 Way bh 4.00 Rp 30,000.00 Rp 120,000.00
- Saklar 2 Gang 1 Way bh 16.00 Rp 35,000.00 Rp 560,000.00
- Saklar 1 Gang 2 Way bh 4.00 Rp 40,000.00 Rp 160,000.00
Stop Kontak Umum 1 Gang ( 2P+E ) Schuko - 250 V w/ Safety Shutter bh 31.00 Rp 35,000.00 Rp 1,085,000.00
-- Stop Kontak Peralatan Outbow ( 2P+E ) Schuko - 250 V bh 80.00 Rp 35,000.00 Rp 2,800,000.00
- Stop Kontak Peralatan Outbow ( 3P+E ) - 400 V / IP44 bh 16.00 Rp 35,000.00 Rp 560,000.00
- Plugs 16 A / ( 3P+E ) - 400 V / IP44 bh 16.00 Rp 250,000.00 Rp 4,000,000.00
3 Instalasi penerangan, NYM 3 x 2,5 mm² dalam conduit PVC HI 20 mm² ttk 144.00 Rp 275,000.00 Rp 39,600,000.00
4 Instalasi stop kontak umum, NYM 3 x 2,5 mm² dalam conduit PVC HI 20 mm² ttk 31.00 Rp 280,000.00 Rp 8,680,000.00
5 Instalasi stop kontak peralatan 1Ø, NYM 3 x 2,5 mm² ttk 80.00 Rp 280,000.00 Rp 22,400,000.00
6 Instalasi stop kontak peralatan 3Ø, NYY 4 x 6 mm² ttk 16.00 Rp 300,000.00 Rp 4,800,000.00
7 Ceiling Mounted Exhaust Fan 10 " KM/WC, 36,8 W / 220 V / 564 CMH set 6.00 Rp 950,000.00 Rp 5,700,000.00
8 Instalasi Ceilling Mounted Exhaust Fan, NYM 3 x 2,5 mm² dalam conduit PVC HI 20 mm² ttk 6.00 Rp 220,000.00 Rp 1,320,000.00
9 Portable Projector XGA (1024 x 768), 4000 Lumens ANSI lengkap dengan ceilling mount bracket ttk 5.00 Rp 7,500,000.00 Rp 37,500,000.00
10 Instalasi Portable Projector, NYM 3 x 2,5 mm² dalam conduit PVC HI 20 mm² ttk 5.00 Rp 280,000.00 Rp 1,400,000.00
11 Instalasi Portable Projector, VGA dalam conduit PVC HI 20 mm² lengkap assesories ttk 5.00 Rp 280,000.00 Rp 1,400,000.00
JUMLAH A IV Rp 243,165,000.00
V Pekerjaan Elektrikal Lantai-03
1 Armature lampu :
- Lampu Down Light RD 125 E 27 Leb Bulb 4 w Cover Glass bh 8.00 Rp 135,000.00 Rp 1,080,000.00
- Lampu Down Light RD 150 E 27 Leb Bulb 8 w Cover Glass bh 6.00 Rp 250,000.00 Rp 1,500,000.00
- Lampu Down Light Comport 150-75 Led DLS 13,6 - 1200lm bh 87.00 Rp 550,000.00 Rp 47,850,000.00
- Lampu RM 300 2x36 M2 T- Led Esential - 2x14,5 W 3200lm bh 16.00 Rp 750,000.00 Rp 12,000,000.00
- Lampu RM 300 2x36 ACR T- Led Esential 2x14,5 W 3200lm bh 32.00 Rp 750,000.00 Rp 24,000,000.00
- Emergency Kit c/w Battery & Charge Min. 2 Hours Backup bh 22.00 Rp 1,200,000.00 Rp 26,400,000.00
2 Peralatan Instalasi :
- Saklar 1 Gang 1 Way bh 8.00 Rp 30,000.00 Rp 240,000.00
- Saklar 2 Gang 1 Way bh 16.00 Rp 35,000.00 Rp 560,000.00
- Saklar 1 Gang 2 Way bh 2.00 Rp 40,000.00 Rp 80,000.00
- Stop Kontak Umum 1 Gang ( 2P+E ) Schuko - 250 V w/ Safety Shutter bh 24.00 Rp 35,000.00 Rp 840,000.00
- Stop Kontak Peralatan Outbow ( 2P+E ) Schuko - 250 V bh 120.00 Rp 35,000.00 Rp 4,200,000.00
- Stop Kontak Peralatan Outbow ( 3P+E ) - 400 V / IP44 bh 10.00 Rp 35,000.00 Rp 350,000.00
- Plugs 16 A / ( 3P+E ) - 400 V / IP44 bh 10.00 Rp 250,000.00 Rp 2,500,000.00
3 Instalasi penerangan, NYM 3 x 2,5 mm² dalam conduit PVC HI 20 mm² ttk 149.00 Rp 275,000.00 Rp 40,975,000.00
4 Instalasi stop kontak umum, NYM 3 x 2,5 mm² dalam conduit PVC HI 20 mm² ttk 24.00 Rp 280,000.00 Rp 6,720,000.00
5 Instalasi stop kontak peralatan 1Ø, NYM 3 x 2,5 mm² ttk 120.00 Rp 280,000.00 Rp 33,600,000.00
6 Instalasi stop kontak peralatan 3Ø, NYY 4 x 6 mm² ttk 10.00 Rp 300,000.00 Rp 3,000,000.00
7 Ceiling Mounted Exhaust Fan 10 " KM/WC, 36,8 W / 220 V / 564 CMH set 6.00 Rp 950,000.00 Rp 5,700,000.00
8 Instalasi Ceilling Mounted Exhaust Fan, NYM 3 x 2,5 mm² dalam conduit PVC HI 20 mm² ttk 6.00 Rp 220,000.00 Rp 1,320,000.00
9 Portable Projector XGA (1024 x 768), 4000 Lumens ANSI lengkap dengan ceilling mount bracket ttk 5.00 Rp 7,500,000.00 Rp 37,500,000.00
10 Instalasi Portable Projector, NYM 3 x 2,5 mm² dalam conduit PVC HI 20 mm² ttk 5.00 Rp 280,000.00 Rp 1,400,000.00
11 Instalasi Portable Projector, VGA dalam conduit PVC HI 20 mm² lengkap assesories ttk 5.00 Rp 280,000.00 Rp 1,400,000.00
JUMLAH A V Rp 253,215,000.00
JUMLAH A Rp 1,567,260,130.63
B PEKERJAAN ELEKTRONIKA (AI+AII+AIII+AIV+AV)
I Lantai-02
1 Terminal BOX c/w LSA 1 x 10 pairs set 1.00 Rp 2,250,000.00 Rp 2,250,000.00
2 Pesawat Telephone Analog KX-T505 set 6.00 Rp 250,000.00 Rp 1,500,000.00
3 Telepon Outlets ( FCC Standard ) /w Surround 1 Gang - 6 Wire bh 6.00 Rp 50,000.00 Rp 300,000.00
4 Instalasi Kabel Telepon ITC 2 x 2 x 0.6 mm² dalam conduit PVC HI 20 mm² ttk 6.00 Rp 325,000.00 Rp 1,950,000.00
5 Instalasi kabel feeder telepon dari MDF ke TB-01
- Instalasi Kabel Telepon ITC 10 x 2 x 0.6 mm² dalam conduit PVC HI 20 mm² m' 110.00 Rp 320,000.00 Rp 35,200,000.00
JUMLAH BI Rp 41,200,000.00
II Lantai-03
1 Terminal BOX c/w LSA 1 x 10 pairs set 1.00 Rp 2,250,000.00 Rp 2,250,000.00
2 Pesawat Telephone Analog KX-T505 set 6.00 Rp 250,000.00 Rp 1,500,000.00
3 Telepon Outlets ( FCC Standard ) /w Surround 1 Gang - 6 Wire bh 6.00 Rp 50,000.00 Rp 300,000.00
4 Instalasi Kabel Telepon ITC 2 x 2 x 0.6 mm² dalam conduit PVC HI 20 mm² ttk 6.00 Rp 325,000.00 Rp 1,950,000.00
5 Instalasi kabel feeder telepon dari MDF ke TB-01
Instalasi Kabel Telepon ITC 10 x 2 x 0.6 mm² dalam conduit m' 120.00 Rp 320,000.00 Rp 38,400,000.00
- PVC HI 20 mm² JUMLAH B II Rp 44,400,000.00
III Pekerjaan Instalasi Data / LAN Lantai -02
1 Patch Panel / Wallmount 2 U unit 2.00 Rp 1,250,000.00 Rp 2,500,000.00
2 8-port UTP, 10/100Mbps, Auto-sensing, Unmanaged unit 4.00 Rp 1,600,000.00 Rp 6,400,000.00
3 Instalasi power wallmount, NYM 3 x 2,5 mm² dalam conduit PVC HI 20 mm² ttk 2.00 Rp 300,000.00 Rp 600,000.00
4 Outlet Data Cat6 c/w Modular Jack bh 26.00 Rp 75,000.00 Rp 1,950,000.00
5 Instalasi Kabel Data / LAN UTP Cable 4 Pairs (Cat 5e) dalam conduit ttk 26.00 Rp 300,000.00 Rp 7,800,000.00
6 PVC HI 20
Instalasi mm²Fedeer Data / LAN dari Patch Utama ke Patch Lantai
Kabel
Instalasi Kabel Data / LAN UTP Cable 4 Pairs (Cat 6) dalam conduit m' 160.00 Rp 320,000.00 Rp 51,200,000.00
- PVC HI 20 mm² JUMLAH B III Rp 70,450,000.00
IV Pekerjaan Instalasi Data / LAN Lantai -03
1 Patch Panel / Wallmount 2 U unit 1.00 Rp 1,250,000.00 Rp 1,250,000.00
2 8-port UTP, 10/100Mbps, Auto-sensing, Unmanaged unit 1.00 Rp 1,600,000.00 Rp 1,600,000.00
3 Instalasi power wallmount, NYM 3 x 2,5 mm² dalam conduit PVC HI 20 mm² ttk 1.00 Rp 300,000.00 Rp 300,000.00
4 Outlet Data Cat6 c/w Modular Jack bh 6.00 Rp 75,000.00 Rp 450,000.00
5 Instalasi Kabel Data / LAN UTP Cable 4 Pairs (Cat 5e) dalam conduit PVC HI 20 mm² ttk 6.00 Rp 300,000.00 Rp 1,800,000.00
6 Instalasi Kabel Fedeer Data / LAN dari Patch Utama ke Patch Lantai
Instalasi Kabel Data / LAN UTP Cable 4 Pairs (Cat 6) dalam conduit m' 120.00 Rp 320,000.00 Rp 38,400,000.00
- PVC HI 20 mm² JUMLAH B IV Rp 43,800,000.00
V Pekerjaan Instalasi MATV Lantai - 02

1 Outlet Televisi 1 Gang 75 Ohm bh 2.00 Rp 65,000.00 Rp 130,000.00


2 Instalasi Kabel MATV Coaxial RG 6 / AWG dalam conduit PVC HI 20 mm² ttk 2.00 Rp 275,000.00 Rp 550,000.00
JUMLAH B V Rp 680,000.00
VI Pekerjaan Instalasi MATV Lantai - 03
1 Outlet Televisi 1 Gang 75 Ohm bh 2.00 Rp 65,000.00 Rp 130,000.00
2 Instalasi Kabel MATV Coaxial RG 6 / AWG dalam conduit PVC HI 20 mm² ttk 2.00 Rp 275,000.00 Rp 550,000.00
JUMLAH B VI Rp 680,000.00
VII Pekerjaan Instalasi Fire Alarm Semi Addressable Lantai -02
1 Smoke Detector Conventional bh 2.00 Rp 400,000.00 Rp 800,000.00
2 ROR Heat Detector bh 10.00 Rp 250,000.00 Rp 2,500,000.00
3 Break Glass bh 2.00 Rp 350,000.00 Rp 700,000.00
4 Alarm Bell bh 2.00 Rp 450,000.00 Rp 900,000.00
5 Indicator Lamp bh 2.00 Rp 150,000.00 Rp 300,000.00
6 Zone Module bh 2.00 Rp 750,000.00 Rp 1,500,000.00
7 Control Module bh 2.00 Rp 1,000,000.00 Rp 2,000,000.00
8 Terminal Box Fire Alarm for 6 module (550 x 475 x 150) bh 1.00 Rp 450,000.00 Rp 450,000.00
9 Instalasi Fire Alarm Kabel NYM 2 x 1,5 mm² dalam conduit PVC HI 20 mm² ttk 12.00 Rp 300,000.00 Rp 3,600,000.00
10 Instalasi for Control Device NYM 2 X 1,5 mm² dalam conduit PVC HI 20 mm² ttk 10.00 Rp 450,000.00 Rp 4,500,000.00
11 Instalasi Looping Fire Alarm Kabel STP AWG18 1P + NYM 2 x 1,5 mm² dalam conduit PVC HI 20 mm² m' 110.00 Rp 450,000.00 Rp 49,500,000.00
12 Box Fire Extingusher ( tertanam tembok) bh 8.00 Rp 900,000.00 Rp 7,200,000.00
13 Fire Extinguisher Dry Chemical kap. 3 kg + Aksesoris bh 8.00 Rp 650,000.00 Rp 5,200,000.00
JUMLAH B VII Rp 79,150,000.00
VIII Pekerjaan Instalasi Fire Alarm Semi Addressable Lantai -02
1 Smoke Detector Conventional bh 2.00 Rp 400,000.00 Rp 800,000.00
2 ROR Heat Detector bh 10.00 Rp 250,000.00 Rp 2,500,000.00
3 Break Glass bh 2.00 Rp 350,000.00 Rp 700,000.00
4 Alarm Bell bh 2.00 Rp 450,000.00 Rp 900,000.00
5 Indicator Lamp bh 2.00 Rp 150,000.00 Rp 300,000.00
6 Zone Module bh 2.00 Rp 750,000.00 Rp 1,500,000.00
7 Control Module bh 2.00 Rp 1,000,000.00 Rp 2,000,000.00
8 Terminal Box Fire Alarm for 6 module (550 x 475 x 150) bh 1.00 Rp 450,000.00 Rp 450,000.00
9 Instalasi Fire Alarm Kabel NYM 2 x 1,5 mm² dalam conduit PVC HI 20 mm² ttk 12.00 Rp 300,000.00 Rp 3,600,000.00
10 Instalasi for Control Device NYM 2 X 1,5 mm² dalam conduit PVC HI 20 mm² ttk 10.00 Rp 450,000.00 Rp 4,500,000.00
11 Instalasi Looping Fire Alarm Kabel STP AWG18 1P + NYM 2 x 1,5 mm² dalam conduit PVC HI 20 mm² m' 120.00 Rp 450,000.00 Rp 54,000,000.00
12 Box Fire Extingusher ( tertanam tembok) bh 8.00 Rp 900,000.00 Rp 7,200,000.00
13 Fire Extinguisher Dry Chemical kap. 3 kg + Aksesoris bh 8.00 Rp 650,000.00 Rp 5,200,000.00
JUMLAH B VIII Rp 83,650,000.00
IX Pekerjaan Instalasi Sound System (Lantai - 02)
1 Ceiling Speaker 6 Watt, metal grill c/w firedome (EVAC) bh 9.00 Rp 520,000.00 Rp 4,680,000.00
2 Horn speaker, daya 15 watt, high impedance bh 4.00 Rp 450,000.00 Rp 1,800,000.00
3 Terminal Boks Sound System bh 1.00 Rp 750,000.00 Rp 750,000.00
4 Instalasi Kabel Sound System NYMHy 2 x 1.5 mm² dalam conduit PVC 20 mm² ttk 13.00 Rp 275,000.00 Rp 3,575,000.00
JUMLAH B IX Rp 10,805,000.00
X Pekerjaan Instalasi Sound System (Lantai - 03)
1 Ceiling Speaker 6 Watt, metal grill c/w firedome (EVAC) bh 10.00 Rp 520,000.00 Rp 5,200,000.00
2 Horn speaker, daya 15 watt, high impedance bh 4.00 Rp 450,000.00 Rp 1,800,000.00
3 Terminal Boks Sound System bh 1.00 Rp 750,000.00 Rp 750,000.00
4 Instalasi Kabel Sound System NYMHy 2 x 1.5 mm² dalam conduit PVC 20 mm² ttk 14.00 Rp 275,000.00 Rp 3,850,000.00
JUMLAH B X Rp 11,600,000.00
XI Pekerjaan Instalasi CCTV (Lantai -02)
Peralatan Utama
Pengadaan dan Pemasangan Peralatan Utama BGM , Berikut dengan Support, Material Bantu Sesuai Dengan
Spesifikasi
1 DVR CCTVCADVR 2016FD 6 TB ( Incl. Harddisk)
Standalone unit 1.00 Rp 5,000,000.00 Rp 5,000,000.00
2 DVR Standalone CADVR 10086FD 6 TB ( Incl. Harddisk) unit 1.00 Rp 6,500,000.00 Rp 6,500,000.00
3 Video Distribution 2 in 16 out unit 2.00 Rp 2,000,000.00 Rp 4,000,000.00
4 Monitor LCD 32" Ex LG dan Inst Central Utama unit 2.00 Rp 1,750,000.00 Rp 3,500,000.00
5 Software dan Training Ls 1.00 Rp 2,500,000.00 Rp 2,500,000.00
6 Rack Kabinet unit 1.00 Rp 1,750,000.00 Rp 1,750,000.00
7 Instalasi Peralatan Utama ls 1.00 Rp 3,250,000.00 Rp 3,250,000.00
8 Test Dan Commisioning Ls 1.00 Rp 2,000,000.00 Rp 2,000,000.00
Pengadaan dan Pemasangan Fixtures lengkap dengan aksesoris lainnya yang dibutuhkan
9 CCTV 2MP Indoor HEL2R1 White Housing ( Dome Camera) unit 2.00 Rp 1,750,000.00 Rp 3,500,000.00
Pengadaan dan Pemasangan Instalasi Lengkap Dengan conduit PVC , T- does , Socket dan aksesoris lainnya
yang dibutuhkan
10 Instalasi Power Listrik ( NYM 2x15mm ) ttk 2.00 Rp 280,000.00 Rp 560,000.00
11 Instalasi Kabel Kamera Coaxial RG 11 ttk 2.00 Rp 300,000.00 Rp 600,000.00
12 Instalasi Power Listrik ( NYM 2x15mm ) dari Lantai 2 ke lantai 3 m' 160.00 Rp 22,000.00 Rp 3,520,000.00
13 Instalasi Kabel Kamera Coaxial RG 11 dari lantai 2 ke lantai 3 m' 160.00 Rp 25,000.00 Rp 4,000,000.00
JUMLAH B XI Rp 40,680,000.00
XII Pekerjaan Instalasi CCTV (Lantai -03)
Pengadaan dan Pemasangan Fixtures lengkap dengan aksesoris lainnya yang dibutuhkan
1 CCTV 2MP Indoor HEL2R1 White Housing ( Dome Camera) unit 2.00 Rp 1,750,000.00 Rp 3,500,000.00
Pengadaan dan Pemasangan Instalasi Lengkap Dengan conduit PVC , T-does , Socket dan aksesoris lainnya yang
2 dibutuhkan
Instalasi Power Listrik ( NYM 2x15mm ) ttk 2.00 Rp 280,000.00 Rp 560,000.00
3 Instalasi Kabel Kamera Coaxial RG 11 ttk 2.00 Rp 300,000.00 Rp 600,000.00
JUMLAH B XII Rp 4,660,000.00
XIII Pekerjaan Instalasi Kabel Tray (Lantai - 02)
1 Kabel Tray GI perforated Type C 300x3000x100 m' 165.42 Rp 230,000.00 Rp 38,046,600.00
2 Kabel Tray GI perforated Type C 200x3000x100 m' 109.66 Rp 220,000.00 Rp 24,125,200.00
3 Kabel Ladder GI perforated Type C 300x3000x100 m' 50.00 Rp 230,000.00 Rp 11,500,000.00
4 Kabel Trunking PVC 100x50 m' 71.61 Rp 190,000.00 Rp 13,605,900.00
JUMLAH B XIII Rp 87,277,700.00
XIV Pekerjaan Instalasi Kabel Tray (Lantai - 03)
1 Kabel Tray GI perforated Type C 300x3000x100 m' 157.50 Rp 230,000.00 Rp 36,225,000.00
2 Kabel Tray GI perforated Type C 200x3000x100 m' 109.66 Rp 220,000.00 Rp 24,125,200.00
3 Kabel Ladder GI perforated Type C 300x3000x100 m' 50.00 Rp 230,000.00 Rp 11,500,000.00
4 Kabel Trunking PVC 100x50 m' 71.61 Rp 190,000.00 Rp 13,605,900.00
JUMLAH B IV Rp 85,456,100.00
JUMLAH B (BI s/d Rp 604,488,800.00
C PEKERJAAN MEKANIKAL BXIV)
I Pekerjaan Instalasi Air Bersih (lantai - 01)
1 Reservoir Kap. 250 M3
- Tanki Reservoir domestik. kapasitas : 250 M3, FRP modular temasuk Pengiriman dan pemasangan unit 1.00 Rp 850,000,000.00 Rp 850,000,000.00
- Pondasi Plat beton bertulang 12cm K-300 m3 60.00 Rp 3,431,764.88 Rp 205,905,892.69
- Floating valve dia. 50 mm bh 1.00 Rp 550,000.00 Rp 550,000.00
- Water Level Control ( WLC ) set 1.00 Rp 1,200,000.00 Rp 1,200,000.00
- Strainer / Saringan bh 1.00 Rp 1,600,000.00 Rp 1,600,000.00
- Foot Valve dia. 65 mm bh 1.00 Rp 1,300,000.00 Rp 1,300,000.00
- Gate valve dia. 50 mm bh 1.00 Rp 850,000.00 Rp 850,000.00

2 Reservoir Kap. 30 M3
- Tanki Reservoir domestik. kapasitas : 30 M3, FRP modular unit 1.00 Rp 125,000,000.00 Rp 125,000,000.00
- Pondasi Plat beton bertulang 12 cm K-300 m3 8.00 Rp 3,431,764.88 Rp 27,454,119.02
- Floating valve dia. 50 mm bh 1.00 Rp 550,000.00 Rp 550,000.00
- Water Level Control ( WLC ) set 1.00 Rp 1,200,000.00 Rp 1,200,000.00
- Strainer / Saringan bh 1.00 Rp 1,600,000.00 Rp 1,600,000.00
- Foot Valve dia. 65 mm bh 1.00 Rp 1,300,000.00 Rp 1,300,000.00
- Gate valve dia. 50 mm bh 1.00 Rp 850,000.00 Rp 850,000.00

3 Pemasangan Instalasi Pengelola Air Bersih Kap. 20 Liter/Menit


- Raw Water Tank unit 1.00 Rp 15,000,000.00 Rp 15,000,000.00
Volume : 5000 liter
Material : Polyethylene
Type : Vertical Tank
Dimensi : Dia. 1,8 m x 2,15 m
Filter Pump unit 2.00 Rp 8,500,000.00 Rp 17,000,000.00
Kap : 6 m3/ jam
Brand : CNP-Vertical Message
Head : 40 Meter
Power : 2,2Kw / 380v / 3 Phase / 50 Hz
Speed : 29000rpm
Material : SS304
Multimedia Filter unit 1.00 Rp 32,000,000.00 Rp 32,000,000.00
Kap : 6 m3/ jam
Type : Vertical Vessel
Dimensi : 24 x 72 "
Material : FRP/Automatic Backwash
Filter Media : Sand Silica
Volume Media : 250 Liter
Piping : PVC AW Rucika/ equal 2"
Carbon Filter unit 1.00 Rp 22,000,000.00 Rp 22,000,000.00
Kap : 6 m3/ jam
Type : Vertical Vessel
Dimensi : 24x72"
Material : FRP/Automatic Backwash
Filter Media : Activated Carbon Grade A
Volume Media : 250 Liter
Brand : AMS
Piping : PVC AW Rucika/ equal 2"
Softener Filter unit 1.00 Rp 15,000,000.00 Rp 15,000,000.00
Kap : 6 m3/ jam
Type : Vertical Vessel
Dimensi : 24x72"
Material : FRP/Automatic Backwash
Filter Media : Softener Resin
Volume Media : 250 Liter
Brand : AMS
Piping : PVC AW Rucika/ equal 2"
Soft Water Tank unit 1.00 Rp 24,000,000.00 Rp 24,000,000.00
Volume : 5000 liter
Material : Polyethylene
Type : Vertical Tank
Dimensi : Dia. 1,8 m x 2,15 m
RO Feed Pump unit 1.00 Rp 12,000,000.00 Rp 12,000,000.00
Kap : 6 m3/ jam
Brand : CNP-Vertical Message
Head : 40 Meter
Power : 2,2Kw / 380v / 3 Phase / 50 Hz
Speed : 29000rpm
Material : SS304
Chemical injection System unit 2.00 Rp 7,500,000.00 Rp 15,000,000.00
dosing pump
Kap : 6 liter/ jam
Type : Diaphargm
Head : 30 Meter
Power : 0,5 Kw/220V/1 phase/50Hz
Speed : 1400rpm
Material PVC
Chemical Tank
volume : 1200Liter
Dimensi : 1,08x1,34 mm
Cartridge Filter unit 2.00 Rp 40,000,000.00 Rp 80,000,000.00
Kap : 6m3/jam
Type : Vertical Vessel
Dimensi : 220 mm x 40"
Material : SS304
No of module : nos
- BWRO Booster Pump unit 1.00 Rp 52,000,000.00 Rp 52,000,000.00
Kap : 6m3/jam
Type : 160meter
power : 7,5Kw/380v/3 phase/50Hz
speed : 2850 rpm
material : SS304
- BWRO Membrane unit 1.00 Rp 7,500,000.00 Rp 7,500,000.00
Feed TDS : 6000ppm
Feed Water : 6m3/jam
Permeate Water : 1,2 m3/jam
Concentrate Water : 4,8 m3/jam
Membrane Type: BW 30-4040
Dimensi : 4"x40"
Material : Thin Film Composite
No of Membrane : 9 nos
Hosing Type/Class : 3 membrane/300psi
Dimensi : 4"x3,4 meter
Material : FRP
No of module : 1nos x 3membrane
Piping
Feed : PVC Sch 80 1,5" Header
Concentrate : SS304 sch 40 1,5" header
Permeate : PVC sch 80 1" header
- RO Water Tank unit 1.00 Rp 15,000,000.00 Rp 15,000,000.00
Volume : 5000 liter
Material : Polyethylene
Type : Vertical Tank
Dimensi : 1,8m x 2,15m
- CIP UNIT unit 1.00 Rp 7,500,000.00 Rp 7,500,000.00
Cleaning pump
Kapasitas : 2m3/jam
Type : CHLF
Head : 20meter
Power : 0,55Kw/380v/3 phase/50Hz
Speed : 2850rpm
Material : SUS304
Cleaning Tank
Volume : 1200liter
Cartrige Filter
Kap : 2m3/jam
Type : Vertical Vessel
Dimensi : 160x20"
Material : SS304
No of module : nos
- Piping installation unit 1.00 Rp 7,500,000.00 Rp 7,500,000.00
- Electrical installation unit 1.00 Rp 4,500,000.00 Rp 4,500,000.00
- Instrumentation unit 1.00 Rp 6,500,000.00 Rp 6,500,000.00
- Control panel unit 1.00 Rp 5,000,000.00 Rp 5,000,000.00
panel box : Pre Standing,Outdoor type ex lokal
Components : Scheneider or equal
Level Switch : Omron or equal
Operation : Manual-Semi Auto by LS & PS
- Upah Pemasangan & Instalasi ls 1.00 Rp 15,000,000.00 Rp 15,000,000.00

4 Row Water
Pompa Row Water Type 30-36 T, inlet 2,5 inch, outlet 2 inch, head 37 m unit 2.00 Rp 7,000,000.00 Rp 14,000,000.00
- Ex Grounfos
Pompa JD Basic 7 daya 750 watt, daya hisap 50 m, daya dorong 50 meter, total unit 2.00 Rp 4,500,000.00 Rp 9,000,000.00
- head
Pompa 100 mSentrifugal
transfer debit 28 ltr/menit inlet 1 1/4
2 Inch Phase NS inch,
30-18outlet 1 inch
M, 1800 watt, Debit unit 2.00 Rp 12,000,000.00 Rp 24,000,000.00
-- 30 m3/jam,
Tanki Row inlet 2 inch,
Water. outlet:12,5
kapasitas 2 inchM3,
(ExFRV
Groundfos)
modular bh 2.00 Rp 17,000,000.00 Rp 34,000,000.00
lengkap dengan dudukan baja dan pondasi beton bertulang
- Floating valve dia. 50 mm set 1.00 Rp 650,000.00 Rp 650,000.00
- Water Level Control ( WLC ) bh 2.00 Rp 500,000.00 Rp 1,000,000.00
- Strainer / Saringan bh 2.00 Rp 1,600,000.00 Rp 3,200,000.00
- Foot Valve dia. 65 mm bh 2.00 Rp 1,400,000.00 Rp 2,800,000.00

5 Pembuatan Sumur Bor dan Pompa


- Pek Sumur Bor Air bersih 120 meter, Diam 4'' + aksesoris lengkap (well casing, sand filter, sealing, gravel pack, Ls 1.00 Rp 170,000,000.00 Rp 170,000,000.00
-screen filter, Sub
Pompa instalation pit) Stainless kapasitas 2 ltr/detik
Sumersible bh 2.00 Rp 12,000,000.00 Rp 24,000,000.00

JUMLAH C I Rp 1,854,510,011.71
II Pekerjaan Instalasi Air Bersih (lantai - 02)
1 Pemipaan Polypropelyne ( PPR ) Class PN.10 :
- Ø 25 mm / ¾" m' 105.75 Rp 65,000.00 Rp 6,873,750.00
- Ø 32 mm / 1" m' 20.75 Rp 95,000.00 Rp 1,971,250.00
2 pompa transfer otomatis - semi jet ( JP Basic 7 ) di lantai 1 set 1.00 Rp 3,500,000.00 Rp 3,500,000.00
3 Tempat Pompa uk. 60 x 60 cm di lantai 1 ls 1.00 Rp 500,000.00 Rp 500,000.00
JUMLAH C II Rp 12,845,000.00
III Pekerjaan Instalasi Air Bersih (lantai - 03)
1 Pompa booster stainless steel otomatis ( CH4-60) set 2.00 Rp 52,000,000.00 Rp 104,000,000.00
Kapasitas = 70 liter/menit, Head = 40 meter
2 Pemipaan Medium Galvanis Standart / SNI 07 - 0039 -87 :
- Ø 25 mm / 1” m' 4.70 Rp 55,000.00 Rp 258,500.00
- Ø 32 mm / 1 ¼” m' 15.00 Rp 115,000.00 Rp 1,725,000.00
- Ø 50 mm / 2” m' 7.50 Rp 125,000.00 Rp 937,500.00
3 Pemipaan Polypropelyne ( PPR ) Class PN.10 :
- Ø 25 mm / ¾" m' 134.75 Rp 65,000.00 Rp 8,758,750.00
- Ø 32 mm / 1" m' 20.75 Rp 95,000.00 Rp 1,971,250.00
4 Gate Valve, Bronze Body, Screwed, Class 125
- Ø 25 mm / ¾" bh 180.00 Rp 650,000.00 Rp 117,000,000.00
- Ø 32 mm / 1" bh 5.00 Rp 900,000.00 Rp 4,500,000.00
- Ø 40 mm / 1¼" bh 9.00 Rp 1,600,000.00 Rp 14,400,000.00
5 Check Valve, Bronze Body, Screwed, Class 125
- Ø 40 mm / 1¼" bh 3.00 Rp 1,500,000.00 Rp 4,500,000.00
6 Strainer, Bronze Body, Screwed, Class 125
- Ø 40 mm / 1¼" bh 2.00 Rp 1,600,000.00 Rp 3,200,000.00
7 Rubber Fleksible Joint 10 Bar Union Screwed Double
- Ø 40 mm / 1¼" bh 4.00 Rp 975,000.00 Rp 3,900,000.00
8 Floating Valve, Bronze Body, Screwed, Class 125
- Ø 50 mm / 2” bh 2.00 Rp 1,600,000.00 Rp 3,200,000.00
9 Tandon Atas Kap. 2.200 ltr set 2.00 Rp 5,500,000.00 Rp 11,000,000.00
JUMLAH C III Rp 279,351,000.00
IV Pekerjaan Instalasi Air Bekas, Kotor & Vent (Lantai -02)
1 Pemipaan PVC AW Kelas 10 kg/cm² :
- Ø 40 mm / 1¼" m' 74.63 Rp 40,000.00 Rp 2,985,200.00
- Ø 76 mm / 2 ½” m' 24.63 Rp 75,000.00 Rp 1,847,250.00
- Ø 89 mm / 3” m' 39.38 Rp 95,000.00 Rp 3,741,100.00
- Ø 114 mm / 4” m' 41.88 Rp 125,000.00 Rp 5,235,000.00
2 Floor Clean Out Ø 89 mm / 3” set 5.00 Rp 350,000.00 Rp 1,750,000.00
3 Grease trap portable (stainlees steel) bh 1.00 Rp 550,000.00 Rp 550,000.00
JUMLAH C IV Rp 16,108,550.00
V Pekerjaan Instalasi Air Bekas, Kotor & Vent (Lantai -03)
1 Pemipaan PVC AW Kelas 10 kg/cm² :
- Ø 40 mm / 1¼" m' 74.63 Rp 40,000.00 Rp 2,985,200.00
- Ø 60 mm / 2” m' 12.50 Rp 75,000.00 Rp 937,500.00
- Ø 76 mm / 2 ½” m' 24.63 Rp 95,000.00 Rp 2,339,850.00
- Ø 89 mm / 3” m' 39.38 Rp 125,000.00 Rp 4,922,500.00
- Ø 114 mm / 4” m' 29.38 Rp 350,000.00 Rp 10,283,000.00
2 Floor Clean Out Ø 89 mm / 3” set 5.00 Rp 350,000.00 Rp 1,750,000.00
3 Grease trap portable (stainlees steel) bh 1.00 Rp 550,000.00 Rp 550,000.00
4 Pipa PVC 3" air hujan dari atap ke saluran m' 858.00 Rp 125,000.00 Rp 107,250,000.00
JUMLAH C V Rp 131,018,050.00
VI Pekerjaan Hydrant (Lantai -01)
1 Box Fire Extingusher ( tertanam tembok) bh 10.00 Rp 800,000.00 Rp 8,000,000.00
2 Fire Extinguisher Dry Chemical kap. 3 kg + Aksesoris bh 10.00 Rp 650,000.00 Rp 6,500,000.00
JUMLAH C VI Rp 14,500,000.00
VII Pekerjaan Hydrant (Lantai -02)
1 Pemipaan BSP Schedule 40 / ASTM A 53:
- Ø 100 mm / 4” m' 12.50 Rp 250,000.00 Rp 3,125,000.00
- Ø 80 mm / 3” m' 10.00 Rp 200,000.00 Rp 2,000,000.00
- Ø 65 mm / 2 ½” m' 60.00 Rp 175,000.00 Rp 10,500,000.00
- Ø 32 mm / 1 ¼” m' 1.25 Rp 140,000.00 Rp 175,000.00

2 Hydrant Boks Type B ( Indoor Type ) set 2.00 Rp 5,500,000.00 Rp 11,000,000.00


c/w :
- Landing Valve PN 16 Ø 65 mm
- Landing Valve PN 16 Ø 40 mm
- Hose ø 40 mm , 30 meter
- Nozzle ø 40 mm
- Hose Rack ø 40 mm
3 Gate Valve, Cast Iron Body, Flanged End, JIS - 10 K set 2.00 Rp 3,750,000.00 Rp 7,500,000.00
- Ø 80 mm / 3”
4 Box Fire Extingusher ( tertanam tembok) bh 8.00 Rp 800,000.00 Rp 6,400,000.00
5 Fire Extinguisher Dry Chemical kap. 3 kg + Aksesoris bh 8.00 Rp 650,000.00 Rp 5,200,000.00
JUMLAH C VII Rp 45,900,000.00
VIII Pekerjaan Hydrant (Lantai -03)
1 Pemipaan BSP Schedule 40 / ASTM A 53:
- Ø 80 mm / 3” m' 22.50 Rp 200,000.00 Rp 4,500,000.00
- Ø 65 mm / 2 ½” m' 6.00 Rp 175,000.00 Rp 1,050,000.00
- Ø 32 mm / 1 ¼” m' 60.00 Rp 140,000.00 Rp 8,400,000.00

2 Hydrant Boks Type B ( Indoor Type ) set 2.00 Rp 800,000.00 Rp 1,600,000.00


c/w :
- Landing Valve PN 16 Ø 65 mm
- Landing Valve PN 16 Ø 40 mm
- Hose ø 40 mm , 30 meter
- Nozzle ø 40 mm
- Hose Rack ø 40 mm
3 Gate Valve, Cast Iron Body, Flanged End, JIS - 10 K
- Ø 80 mm / 3” set 2.00 Rp 3,200,000.00 Rp 6,400,000.00
4 Automatic Air Vent set 2.00 Rp 4,000,000.00 Rp 8,000,000.00
5 Presure gauge 1" set 2.00 Rp 1,200,000.00 Rp 2,400,000.00
6 Box Fire Extingusher ( tertanam tembok) bh 8.00 Rp 800,000.00 Rp 6,400,000.00
7 Fire Extinguisher Dry Chemical kap. 3 kg + Aksesoris bh 8.00 Rp 600,000.00 Rp 4,800,000.00
JUMLAH C VIII Rp 43,550,000.00
IX Pekerjaan Instalasi Tata Udara ( AC ) (Lantai -02)
1 Peralatan Utama AC lengkap c/w Pemipaan HVAC ( Cu ) Type ASTM B280 :
- AC Cassete Standard Class 28.000 btu/H Wireless unit 4.00 Rp 22,000,000.00 Rp 88,000,000.00
- AC Cassete Standard Class 36.000 btu/H Wireless unit 8.00 Rp 27,000,000.00 Rp 216,000,000.00
2 Instalasi AC, NYM 3 x 2,5 mm² dalam conduit PVC HI 20 mm² ttk 12.00 Rp 320,000.00 Rp 3,840,000.00
3 Pemipaan drainage AC Wall Mounted Single Split , PVC AW lengkap dengan isolasi aeroflex ttk 12.00 Rp 65,000.00 Rp 780,000.00
JUMLAH C IX Rp 308,620,000.00
X Pekerjaan Instalasi Tata Udara ( AC ) (Lantai -03)
1 Peralatan Utama AC lengkap c/w Pemipaan HVAC ( Cu ) Type ASTM B280 :
- AC Cassete Standard Class 28.000 btu/H Wireless unit 5.00 Rp 22,000,000.00 Rp 110,000,000.00
- AC Cassete Standard Class 36.000 btu/H Wireless unit 7.00 Rp 27,000,000.00 Rp 189,000,000.00
2 Instalasi AC, NYM 3 x 2,5 mm² dalam conduit PVC HI 20 mm² ttk 12.00 Rp 320,000.00 Rp 3,840,000.00
3 Pemipaan drainage AC Wall Mounted Single Split , PVC AW lengkap dengan isolasi aeroflex ttk 12.00 Rp 65,000.00 Rp 780,000.00
JUMLAH C X Rp 303,620,000.00
XI PEKERJAAN UTILITAS GEDUNG
1 RUMAH POMPA UK. 6x10 Meter tinggi plafon 4,5 meter termasuk atap m2 60.00 Rp 3,500,000.00 Rp 210,000,000.00

2 Main Diesel Fire Pump Ex Versa / Groundfos unit 1.00 Rp 250,000,000.00 Rp 250,000,000.00
Type : Horizontal Split Case
Kapasitas : 1000 Gpm
Total Head : 75 meter
Standart : NFPA 20
Lengkap Panel Control NFPA-20 Standard
Lengkap Panel Control NFPA-20 Standard unit 1.00 Rp 24,000,000.00 Rp 24,000,000.00
Type : Horizontal Split Case
Kapasitas : 1000 Gpm
Total Head : 75 meter
Standart : NFPA 20
Lengkap Panel Control NFPA-20 Standard
Jockey Fire Pump Ex Versa / Groundfos unit 1.00 Rp 65,000,000.00 Rp 65,000,000.00
Type : Vertical Multi Stage
Kapasitas : 50 Lpm
Total Head : 80 meter
Lengkap Panel Control NFPA-20 Standard
Diafragma Tank unit 1.00 Rp 1,200,000.00 Rp 1,200,000.00
- Kapasitas : 100 Lt
Horn / Buzzer unit 1.00 Rp 700,000.00 Rp 700,000.00
Daily Tank lengkap dudukan unit 1.00 Rp 2,500,000.00 Rp 2,500,000.00
- Volume : 200 Lt
Hand Pump unit 1.00 Rp 1,700,000.00 Rp 1,700,000.00
Electroda Water Level Control ( WLC ) unit 1.00 Rp 1,200,000.00 Rp 1,200,000.00
Foot Valve :
- Diameter 150 mm bh 1.00 Rp 3,500,000.00 Rp 3,500,000.00
- Diameter 65 mm bh 1.00 Rp 800,000.00 Rp 800,000.00
Flexible Joint 16 K :
- Diameter 150 mm bh 4.00 Rp 4,500,000.00 Rp 18,000,000.00
- Diameter 65 mm bh 1.00 Rp 800,000.00 Rp 800,000.00
- Diameter 50 mm bh 1.00 Rp 600,000.00 Rp 600,000.00
Check Valve 16 K :
- Diameter 150 mm bh 2.00 Rp 4,500,000.00 Rp 9,000,000.00
- Diameter 50 mm bh 1.00 Rp 600,000.00 Rp 600,000.00
Gate Valve 16 K :
- Diameter 150 mm bh 3.00 Rp 4,500,000.00 Rp 13,500,000.00
- Diameter 65 mm bh 2.00 Rp 800,000.00 Rp 1,600,000.00
- Diameter 50 mm bh 1.00 Rp 600,000.00 Rp 600,000.00
- Diameter 25 mm bh 1.00 Rp 450,000.00 Rp 450,000.00
Safety Relief Valve :
- Diameter 40 mm bh 1.00 Rp 450,000.00 Rp 450,000.00
Alarm Check Valve :
- Diameter 100 mm bh 2.00 Rp 3,500,000.00 Rp 7,000,000.00
Pressure Gauge + Ball valve bh 1.00 Rp 2,500,000.00 Rp 2,500,000.00
Header Diameter 200 mm bh 2.00 Rp 6,000,000.00 Rp 12,000,000.00
Pemipaan BSP Schedule 40 di ruang Pompa
- Diameter 150 mm m' 22.00 Rp 325,000.00 Rp 7,150,000.00
- Diameter 100 mm m' 12.00 Rp 250,000.00 Rp 3,000,000.00
- Diameter 65 mm m' 4.00 Rp 175,000.00 Rp 700,000.00
- Diameter 50 mm m' 2.00 Rp 150,000.00 Rp 300,000.00
- Diameter 25 mm m' 6.00 Rp 90,000.00 Rp 540,000.00
Pemipaan BSP Schedule 40 ke Pillar Hydrant & Siamise
- Diameter 100 mm, ke Pilar Hydrant m' 16.00 Rp 250,000.00 Rp 4,000,000.00
- Diameter 100 mm, ke Siamise Connection m' 50.00 Rp 250,000.00 Rp 12,500,000.00
- Diameter 150 mm, ke Gedung UPIP m' 160.00 Rp 325,000.00 Rp 52,000,000.00
- Pillar Hydrant + Hose Cabinet unit 1.00 Rp 6,500,000.00 Rp 6,500,000.00
- Siamise Connection unit 1.00 Rp 4,500,000.00 Rp 4,500,000.00
- Gate valve dia. 100 mm bh 1.00 Rp 3,500,000.00 Rp 3,500,000.00
- Check valve dia. 100 mm bh 1.00 Rp 3,200,000.00 Rp 3,200,000.00
- Pipa Gas Buang BSP Sch.40, Diameter 100 mm m' 12.00 Rp 250,000.00 Rp 3,000,000.00
- Kabel Instalasi dari PP- HYDRANT ke Main Electric Pump - Kabel FRC 4 x 150 mm2 m' 15.00 Rp 1,200,000.00 Rp 18,000,000.00
- Kabel Instalasi dari PP-HYDRANT ke Jokey Pump, NYY 4 x 4 mm2 m' 14.00 Rp 120,000.00 Rp 1,680,000.00

JUMLAH C XI Rp 748,270,000.00
JUMLAH C (CI s/d C Rp 3,743,792,611.71
XI)
ANALISA HARGA SATUAN SNI 2008 DAN PENDEKATAN LAPANGAN
PEKERJAAN LANJUTAN PEMBANGUNAN GEDUNG BENGKEL TENAGA TEKNIK LISTRIK INDUST

NO. URAIAN SATUAN INDEKS


PEKERJAAN PERSIAPAN
1 1 m² PEKERJAAN PENGUKURAN KEMBALI
NO KEBUTUHAN SATUAN INDEKS
TENAGA KERJA
1 Pekerja oh 0.100
2 Tukang Kayu oh 0.100
3 Kepala Tukang oh 0.010
4 Mandor oh 0.005
TOTAL
PROFIT 15%
JUMLAH
PEKERJAAN BETON (SNI 7394:2008)
2 1 M² PEKERJAAN BEKISTING UNTUK PONDASI (BATAKO)
NO KEBUTUHAN SATUAN INDEKS
BAHAN
1 Batako bh 18.000
2 Pasir pasang m³ 0.033
3 Semen (PC) kg 2.800
SNI 7394:2008

4 PERALATAN BANTU LS 1.000


TENAGA KERJA
1 Pekerja oh 0.320
2 Tukang Batu oh 0.120
3 Kepala Tukang oh 0.012
4 Mandor oh 0.015
TOTAL
PROFIT 15%
JUMLAH
3 1 M² PEKERJAAN BEKISTING UNTUK SLOOF/BATAKO
NO KEBUTUHAN SATUAN INDEKS
BAHAN
1 Batako bh 12.500
2 Pasir pasang m³ 0.021
3 Semen (PC) kg 2.500
SNI 7394:2008

4 PERALATAN BANTU LS 1.000


TENAGA KERJA
1 Pekerja oh 0.320
2 Tukang Batu oh 0.120
3 Kepala Tukang oh 0.012
4 Mandor oh 0.015
TOTAL
PROFIT 15%
JUMLAH
4 1 M² PEKERJAAN BEKISTING UNTUK KOLOM
SNI 7394:2008
KEBUTUHAN SATUAN INDEKS
NO
BAHAN
1 Kayu kelas III 2 x 20 x 400 m³ 0.040
2 Paku kg 0.400
3 Minyak begisting ltr 0.200
4 Kayu kelas II (Balok) m³ 0.015
5 Multiplex 9 mm lbr 0.350
6 Dolken Ø 8 - 10 CM (kayu cerucuk) btg 2.000
TENAGA KERJA
1 Pekerja oh 0.660
2 Tukang Kayu oh 0.330
3 Kepala Tukang oh 0.033
4 Mandor oh 0.033
TOTAL
PROFIT 15%
JUMLAH
5 1 M² PEKERJAAN BEKISTING UNTUK BALOK
SNI 7394:2008

NO KEBUTUHAN SATUAN INDEKS


BAHAN
1 Kayu kelas III 2 x 20 x 400 m³ 0.040
2 Paku kg 0.400
3 Minyak begisting ltr 0.200
4 Kayu kelas II (Balok) m³ 0.018
5 Multiplex 9 mm lbr 0.350
6 Dolken Ø 8 - 10 CM (kayu cerucuk) btg 2.000
TENAGA KERJA
1 Pekerja oh 0.660
2 Tukang Kayu oh 0.330
3 Kepala Tukang oh 0.033
4 Mandor oh 0.033
TOTAL
PROFIT 15%
JUMLAH
6 1 M² PEKERJAAN BEKISTING UNTUK DINDING
NO KEBUTUHAN SATUAN INDEKS
SNI

BAHAN
1 Kayu kelas III 2 x 20 x 400 m³ 0.030
2 Paku kg 0.400
3 Minyak begisting ltr 0.2
4 Kayu kelas II (Balok) m³ 0.02
5 Multiplex 9 mm lbr 0.350
6 Dolken Ø 8 - 10 CM (kayu cerucuk) btg 3.000
TENAGA KERJA
1 Pekerja oh 0.660
2 Tukang Kayu oh 0.330
3 Kepala Tukang oh 0.033
4 Mandor oh 0.033
TOTAL
PROFIT 15%
JUMLAH
7 1 KG PEKERJAAN BESI BJTP-24
SNI 7394:2008

NO KEBUTUHAN SATUAN INDEKS


BAHAN
1 Besi BJTP-24 kg 1.050
2 Kawat bendrat kg 0.150
TENAGA KERJA
1 Pekerja oh 0.070
2 Tukang Besi oh 0.050
3 Kepala Tukang oh 0.007
4 Mandor oh 0.004
TOTAL
PROFIT 15%
JUMLAH
8 1 KG PEKERJAAN BESI BJTD-39
NO KEBUTUHAN SATUAN INDEKS
BAHAN
1 Besi BJTD-39 kg 1.050
2 Kawat bendrat kg 0.150
SNI 7394:2008

TENAGA KERJA
1 Pekerja oh 0.070
2 Tukang Besi oh 0.070
3 Kepala Tukang oh 0.007
4 Mandor oh 0.004
TOTAL
PROFIT 15%
JUMLAH
9 1 KG PEKERJAAN BESI IWF
NO KEBUTUHAN SATUAN INDEKS
BAHAN
1 Baja WF 200 kg 1.192
2 PENGELASAN cm 0.500
SNI 7394:2008

TENAGA KERJA
1 Pekerja oh 0.140
2 Tukang Besi oh 0.140
3 Kepala Tukang oh 0.014
4 Mandor oh 0.008
TOTAL
PROFIT 15%
JUMLAH
10 1 KG PEKERJAAN BESI SIKU 50 X 50
NO KEBUTUHAN SATUAN INDEKS
BAHAN
1 Besi Siku 50 x 50 kg 1.050
2 PENGELASAN cm 0.150
SNI 7394:2008

TENAGA KERJA
1 Pekerja oh 0.140
2 Tukang Besi oh 0.140
3 Kepala Tukang oh 0.014
4 Mandor oh 0.008
TOTAL
PROFIT 15%
JUMLAH
9 1 M³ PEKERJAAN MEMBUAT BETON MUTU SITE MIX (K 175)
NO KEBUTUHAN SATUAN INDEKS
BAHAN
1 Semen (PC) kg 326.000
2 Pasir beton m³ 0.543
3 Batu split 2/3 m³ 0.762
SNI 7394:2008

4 Air ltr 215.000


TENAGA KERJA
1 Pekerja oh 1.650
2 Tukang Batu oh 0.275
3 Kepala Tukang oh 0.028
4 Mandor oh 0.083
TOTAL
PROFIT 15%
JUMLAH
10 1 M³ PEKERJAAN MEMBUAT BETON MUTU SITE MIX (K 250)
NO KEBUTUHAN SATUAN INDEKS
BAHAN
1 Semen (PC) kg 384.000
2 Pasir beton m³ 0.494
3 Batu split 2/3 m³ 0.770
SNI 7394:2008

4 Air ltr 215.000


TENAGA KERJA
1 Pekerja oh 1.650
2 Tukang Batu oh 0.275
3 Kepala Tukang oh 0.028
4 Mandor oh 0.083
TOTAL
PROFIT 15%
JUMLAH
11 1 M³ PEKERJAAN MEMBUAT BETON MUTU SITE MIX (K 300)
NO KEBUTUHAN SATUAN INDEKS
BAHAN
1 Semen (PC) kg 413.000
2 Pasir beton m³ 0.486
3 Batu split 2/3 m³ 0.756
SNI 7394:2008
4 Air ltr 215.000
TENAGA KERJA
1 Pekerja oh 1.650
2 Tukang Batu oh 0.275
3 Kepala Tukang oh 0.028
4 Mandor oh 0.083
TOTAL
PROFIT 15%
JUMLAH
12 1 M³ PEKERJAAN BETON READ MIX K 225
NO KEBUTUHAN SATUAN INDEKS
BAHAN
1 Beton read mix K-225 M3 1.000
2 ALAT ls 1.000
SNI 7394:2008

TENAGA KERJA
1 Pekerja oh 1.650
2 Tukang Batu oh 0.275
3 Kepala Tukang oh 0.028
4 Mandor oh 0.083
TOTAL
PROFIT 15%
JUMLAH
13 1 M³ PEKERJAAN BETON READ MIX K 250
NO KEBUTUHAN SATUAN INDEKS
BAHAN
1 Beton read mix K-250 M3 1.000
2 ALAT ls 1.000
SNI 7394:2008

TENAGA KERJA
1 Pekerja oh 1.650
2 Tukang Batu oh 0.275
3 Kepala Tukang oh 0.028
4 Mandor oh 0.083
TOTAL
PROFIT 15%
JUMLAH
14 1 M³ PEKERJAAN BETON READ MIX K 350
NO KEBUTUHAN SATUAN INDEKS
BAHAN
1 Beton read mix K-350 M3 1.000
2 ALAT ls 1.000
SNI 7394:2008

TENAGA KERJA
1 Pekerja oh 1.650
SNI 7394:2008
2 Tukang Batu oh 0.275
3 Kepala Tukang oh 0.028
4 Mandor oh 0.083
TOTAL
PROFIT 15%
JUMLAH
15 1 M³ PEKERJAAN BETON READ MIX K 500
NO KEBUTUHAN SATUAN INDEKS
BAHAN
1 Beton read mix K-500 M3 1.000
2 ALAT ls 1.000
SNI 7394:2008

TENAGA KERJA
1 Pekerja oh 1.650
2 Tukang Batu oh 0.275
3 Kepala Tukang oh 0.028
4 Mandor oh 0.083
TOTAL
PROFIT 15%
JUMLAH
16 1 M³ BETON READY MIX K-300
NO KEBUTUHAN SATUAN INDEKS
BAHAN
1 Beton read mix K-300 M3 1.000
2 ALAT ls 1.000
SNI 7394:2008

TENAGA KERJA
1 Pekerja oh 1.650
2 Tukang Batu oh 0.275
3 Kepala Tukang oh 0.028
4 Mandor oh 0.083
TOTAL
PROFIT 15%
JUMLAH
1 M³ RIB 12/120,10/90,12/260,(150 kg/m3) K250
NO KEBUTUHAN SATUAN INDEKS
BAHAN M³ 1.000
1
2 KG 150.000
3 KG
4 M² 4.000
JUMLAH
17 1 M³ PLAT BETON (t=12 cm)
NO KEBUTUHAN SATUAN INDEKS
BAHAN
1 M³ 1.000
2 KG 120.000
3 KG
4 M² 0.200
JUMLAH
18 1 M³ PEKERJAAN MEMBUAT LANTAI KERJA BETON
SNI 7394:2008
NO KEBUTUHAN SATUAN INDEKS
BAHAN
1 Semen (PC) kg 230.000
2 m3 0.638
3 m 0.761
4 Air ltr 215.000
TENAGA KERJA
1 Pekerja oh 1.650
2 Tukang Batu oh 0.275
3 Kepala Tukang oh 0.028
4 Mandor oh 0.083
JUMLAH
19 1 M³ PEKERJAAN MEMBUAT KOLOM UK. 15 X 20 CM
SNI 7394:2008

NO KEBUTUHAN SATUAN INDEKS


BAHAN
1 Beton Site Mix M³ 1.050
2 Besi Beton KG 189.444
3 Semen KG 88.889
4 Bekisting M² 4.861

TOTAL
PROFIT 15%
JUMLAH
12 1 m³ PEKERJAAN MEMBUAT KOLOM PRAKTIS 10 X 10
NO KEBUTUHAN SATUAN INDEKS
BAHAN
SNI 7394:2008

1 Beton Site Mix M³ 1.050


2 Besi Beton KG 227.333
3 Semen KG 64.000
4 Bekisting M² 12.000
TOTAL
PROFIT 15%
JUMLAH
13 1 M³ PEKERJAAN MEMBUAT RING BALOK UK. 15 X 10 CM
NO KEBUTUHAN SATUAN INDEKS
BAHAN
SNI 7394:2008

1 Beton Site Mix M³ 1.050


2 Besi Beton KG 181.867
3 Semen KG 97.778
4 Bekisting M² 5.185
TOTAL
PROFIT 15%
JUMLAH
14 1 M³ PEKERJAAN MEMBUAT BALOK LATEI UK. 10 X 12 CM
NO KEBUTUHAN SATUAN INDEKS
BAHAN

SNI 7394:2008
1 Beton Site Mix M³ 1.050
2 Besi Beton KG 227.333
3 Semen KG 108.889
4 Bekisting M² 6.667
TOTAL
PROFIT 15%
JUMLAH
PEKERJAAN PLAFOND (SNI 2839:2008)
15 1 M² MEMASANG PLAFOND GYPSUM BOARD UK. 1.2 X 2.4 X 9 MM
SNI 2839:2008

NO KEBUTUHAN SATUAN INDEKS


BAHAN
1 Gypsum board (UK. 120 X 240 X 0.09 CM) LBR 0.347
2 Besi hollow untuk plafond M 4.000
3 Paku ramset+misiu BH 4.000
4 Klem pengantung ke beton BH 4.000
5 Klem pengantung ke plafond BH 4.000
6 Kawat galvano M 4.000
7 Kain Kasa M 1.000
8 Alkasit KG 0.500
9 skrup BH 12.000
TENAGA KERJA
1 Pekerja oh 0.100
2 Tukang Kayu oh 0.050
3 Kepala Tukang oh 0.005
4 Mandor oh 0.005
TOTAL
PROFIT 15%
JUMLAH
16 1 M² MEMASANG PLAFOND GRC BOARD UK. 1.2 X 2.4 X 6 MM
SNI 2839:2008

NO KEBUTUHAN SATUAN INDEKS


BAHAN
1 Grc (UK. 120 X 240 X 0.06 CM) LBR 0.347
2 Besi hollow untuk plafond M 4.000
3 Paku ramset+misiu BH 4.000
4 Klem pengantung ke beton BH 4.000
5 Klem pengantung ke plafond BH 4.000
6 Kawat galvano M 4.000
7 Kain Kasa M 1.000
8 Alkasit KG 0.500
9 skrup BH 12.000
TENAGA KERJA
1 Pekerja oh 0.100
2 Tukang Kayu oh 0.050
3 Kepala Tukang oh 0.005
4 Mandor oh 0.005
TOTAL
PROFIT 15%
JUMLAH
17 1 M² MEMASANG AKUSTIK UK. 60 X 120 CM
NO KEBUTUHAN SATUAN INDEKS
BAHAN
1 Akustik UK. 60 X 120 LBR 1.500
2 Main Tee untuk akustik M 6.667
3 Paku ramset+misiu BH 13.000
4 Klem pengantung ke beton BH 13.000
SNI 2839:2008

5 Klem pengantung ke plafond BH 13.000


6 Kawat galvano M 13.500
TENAGA KERJA
1 Pekerja oh 0.100
2 Tukang Kayu oh 0.100
3 Kepala Tukang oh 0.010
4 Mandor oh 0.005
TOTAL
PROFIT 15%
JUMLAH
18 1M MEMASANG LIST PLAFOND GYPSUM
SNI 2839:2008

NO KEBUTUHAN SATUAN INDEKS


BAHAN M 1.050
1 List Gypsum
2 Alkasit KG 0.150
3 skrup BH 3.000
TENAGA KERJA
1 Pekerja oh 0.060
2 Tukang Kayu oh 0.060
3 Kepala Tukang oh 0.006
4 Mandor oh 0.003
TOTAL
PROFIT 15%
JUMLAH
PEKERJAAN PLESTERAN (SNI 2837:2008)
19 1 m² PEKERJAAN MEMASANG PLESTERAN 1:3
SNI 2837:2008

NO KEBUTUHAN SATUAN INDEKS


BAHAN
1 Semen (PC) kg 7.776
2 Pasir pasang m³ 0.023
TENAGA KERJA
1 Pekerja oh 0.300
2 Tukang Kayu oh 0.150
3 Kepala Tukang oh 0.015
4 Mandor oh 0.015
TOTAL
PROFIT 15%
JUMLAH
20 1 m² PEKERJAAN MEMASANG PLESTERAN 1:5
SNI 2837:2008

NO KEBUTUHAN SATUAN INDEKS


BAHAN
1 Semen (PC) kg 5.184
2 Pasir pasang m³ 0.026
TENAGA KERJA
1 Pekerja oh 0.300
2 Tukang Batu oh 0.150
3 Kepala Tukang oh 0.015
4 Mandor oh 0.015
TOTAL
PROFIT 15%
JUMLAH
21 1 m² PEKERJAAN MEMASANG PLESTERAN T.10 MM
NO KEBUTUHAN SATUAN INDEKS
BAHAN
1 Semen untuk plesteran - PM 210 kg 20.000
TENAGA KERJA
1 Pekerja oh 0.300
2 Tukang Batu oh 0.150
3 Kepala Tukang oh 0.015
4 Mandor oh 0.015
TOTAL
PROFIT 15%
JUMLAH
22 1 m² PEKERJAAN MEMASANG ACIAN T.2 MM
SNI 2837:2008

NO KEBUTUHAN SATUAN INDEKS


BAHAN
1 Semen untuk plesteran - PM 210 kg 2.200
TENAGA KERJA
1 Pekerja oh 0.150
2 Tukang Batu oh 0.100
3 Kepala Tukang oh 0.010
4 oh 0.008
TOTAL
PROFIT 15%
JUMLAH
23 1 M² PEKERJAAN MEMASANG PLESTERAN SKONING 10 MM 1:2
SNI 2837:2008

NO KEBUTUHAN SATUAN INDEKS


BAHAN
1 Semen (PC) kg 0.500
2 Pasir pasang m³ 0.013
TENAGA KERJA
1 Pekerja oh 0.080
2 Tukang Batu oh 0.400
3 Kepala Tukang oh 0.040
4 Mandor oh 0.004
TOTAL
PROFIT 15%
JUMLAH
24 1 M' PEKERJAAN MEMASANG BENANG SUDUT
NO KEBUTUHAN SATUAN INDEKS
BAHAN
1 Semen untuk plesteran - PM 210 kg 1.625
TENAGA KERJA
1 Pekerja oh 0.075
2 Tukang Batu oh 0.050
3 Kepala Tukang oh 0.005
4 Mandor oh 0.004
TOTAL
PROFIT 15%
JUMLAH
25 1 M' PEKERJAAN MEMASANG NAT TALI AIR
NO KEBUTUHAN SATUAN INDEKS
BAHAN
1 Semen untuk plesteran - PM 210 kg 1.625
TENAGA KERJA
1 Pekerja oh 0.100
2 Tukang Batu oh 0.067
3 Kepala Tukang oh 0.007
4 Mandor oh 0.005
TOTAL
PROFIT 15%
JUMLAH
26 1 M2 PEKERJAAN ACIAN BETON T. 2 MM
NO KEBUTUHAN SATUAN INDEKS
BAHAN
1 Semen untuk Acian Beton - PM 300 kg 2.200
TENAGA KERJA
1 Pekerja oh 0.286
2 Tukang Batu oh 0.214
3 Kepala Tukang oh 0.021
4 Mandor oh 0.020
TOTAL
PROFIT 15%
JUMLAH
PEKERJAAN PASANGAN DINDING (SNI 6897:2008)
27 1 m² PEKERJAAN MEMASANG BATU BATA MERAH 1:3

SNI 6897:2008
NO KEBUTUHAN SATUAN INDEKS
BAHAN
1 Bata merah bh 70.000
2 Semen (PC) kg 14.370
3 Pasir pasang m³ 0.040
TENAGA KERJA
1 Pekerja oh 0.300
2 Tukang Batu oh 0.100
3 Kepala Tukang oh 0.010
4 Mandor oh 0.015
TOTAL
PROFIT 15%
JUMLAH
28 1 m² PEKERJAAN MEMASANG BATU BATA ROSTER
NO KEBUTUHAN SATUAN INDEKS
BAHAN
1 Roster uk. 20x20 bh 25.000
2 Semen (PC) kg 7.185
3 Pasir pasang m³ 0.040
SNI 6897:2008

TENAGA KERJA
1 Pekerja oh 0.300
2 Tukang Batu oh 0.100
3 Kepala Tukang oh 0.010
4 Mandor oh 0.015
TOTAL
PROFIT 15%
JUMLAH
29 1 m² PEKERJAAN MEMASANG BATU BATA MERAH 1:5
NO KEBUTUHAN SATUAN INDEKS
BAHAN
1 Bata merah bh 70.000
2 Semen (PC) kg 9.680
SNI 6897:2008

3 Pasir pasang m³ 0.045


TENAGA KERJA
1 Pekerja oh 0.300
2 Tukang Batu oh 0.100
3 Kepala Tukang oh 0.010
4 Mandor oh 0.015
TOTAL
PROFIT 15%
JUMLAH
30 1 m² PEKERJAAN MEMASANG BATA RINGAN
NO KEBUTUHAN SATUAN INDEKS
BAHAN
1 Bata ringan M2 1.050
2 Semen untuk perekat bata ringan MU 380 (T. 10 mm) KG 11.429
TENAGA KERJA
1 Pekerja oh 0.300
2 Tukang Batu oh 0.100
3 Kepala Tukang oh 0.010
4 Mandor oh 0.015
TOTAL
PROFIT 15%
JUMLAH
31 1 M² MEMASANG DINDING PARTISI GYPSUM BOARD UK. 1.2 X 2.4 X 12 MM
SNI 6897:2008

NO KEBUTUHAN SATUAN INDEKS


BAHAN LBR 0.694
1 Gypsum board (UK. 120 X 240 X 0.12 CM)
2 Metal Stud Chanel L. 750 mm M 4.000
3 Paku ramset+misiu BH 5.000
4 Kain Kasa M 2.000
5 Alkasit KG 0.500
6 skrup BH 12.000
TENAGA KERJA
1 Pekerja oh 0.200
2 Tukang Kayu oh 0.100
3 Kepala Tukang oh 0.010
4 Mandor oh 0.010
TOTAL
PROFIT 15%
JUMLAH

PEKERJAAN PELAPIS DINDING DAN LANTAI (SNI 7395:2008)


32 1 M² PEKERJAAN MEMASANG LANTAI KERAMIK UK.40 X 40 CM (CT-4)
NO KEBUTUHAN SATUAN INDEKS
BAHAN
1 Keramik tile uk. 40 X 40 cm (CT-4) M³ 1.050
2 Semen (PC) kg 8.160
3 Pasir pasang m³ 0.023
4 Semen Warna KG 0.900
TENAGA KERJA
1 Pekerja oh 0.250
2 Tukang Batu oh 0.120
3 Kepala Tukang oh 0.012
4 Mandor oh 0.013
TOTAL
PROFIT 15%
JUMLAH
1 M² PEKERJAAN MEMASANG LANTAI GRANITE UK.40 X 40 CM (HT-2)

SNI 7395:2008
NO KEBUTUHAN SATUAN INDEKS
BAHAN
1 Homogenius tile uk. 40 X 40 cm (HT-2) M³ 1.050
2 Semen (PC) kg 10.000
3 Pasir pasang m³ 0.045
4 Semen Warna KG 1.500
TENAGA KERJA
1 Pekerja oh 0.260
2 Tukang Batu oh 0.130
3 Kepala Tukang oh 0.013
4 Mandor oh 0.013
TOTAL
PROFIT 15%
JUMLAH
33 1 M² PEKERJAAN MEMASANG LANTAI GRANITE UK.60 X 60 CM (HT-3)
NO KEBUTUHAN SATUAN INDEKS
BAHAN
1 Homogenius tile uk. 60 X 60 cm (HT-3) M2 1.050
2 Semen (PC) kg 8.190
3 Pasir pasang m³ 0.045
4 Semen Warna KG 1.000
TENAGA KERJA
1 Pekerja oh 0.250
2 Tukang Batu oh 0.120
3 Kepala Tukang oh 0.012
4 Mandor oh 0.013
TOTAL
PROFIT 15%
JUMLAH
34 1 m² PEKERJAAN FLOOR HARDENER
NO KEBUTUHAN SATUAN INDEKS
BAHAN
1 Floor hardener KG 3.000
TENAGA KERJA
1 Pekerja oh 0.120
2 Tukang Batu oh 0.120
3 Kepala Tukang oh 0.012
4 Mandor oh 0.006
TOTAL
PROFIT 15%
JUMLAH
36 1 M² PEKERJAAN MEMASANG LANTAI KERAMIK UK.30 X 30 CM (UP)
NO KEBUTUHAN SATUAN INDEKS
BAHAN
95:2008
1 Keramik uk. 30 X 30 cm M2 1.050
2 Semen (PC) kg 8.360

`SNI 7395:2008
3 Pasir pasang m³ 0.023
4 Semen Warna KG 0.900
TENAGA KERJA
1 Pekerja oh 0.250
2 Tukang Batu oh 0.120
3 Kepala Tukang oh 0.012
4 Mandor oh 0.013
TOTAL
PROFIT 15%
JUMLAH
34 1 M' PEKERJAAN MEMASANG PLINT GRANIT TILE UK.16 X 60 CM
NO KEBUTUHAN SATUAN INDEKS
BAHAN
1 Plint Granit Tile 16 x 60 bj 1.667
2 Semen (PC) kg 1.140
3 Pasir pasang m³ 0.003
SNI 7395:2008

4 Semen Warna KG 0.025


TENAGA KERJA
1 Pekerja oh 0.090
2 Tukang Batu oh 0.090
3 Kepala Tukang oh 0.009
4 Mandor oh 0.005
TOTAL
PROFIT 15%
JUMLAH
35 1M' PEKERJAAN MEMASANG PLINT GRANITE UK.10 X 60 CM
NO KEBUTUHAN SATUAN INDEKS
BAHAN
1 Plint homogenius tile uk. 10 X 60 cm bj 1.667
2 Semen (PC) kg 1.650
3 Pasir pasang m³ 0.003
4 Semen Warna KG 0.100
TENAGA KERJA
1 Pekerja oh 0.090
2 Tukang Batu oh 0.090
3 Kepala Tukang oh 0.009
4 Mandor oh 0.005
TOTAL
PROFIT 15%
JUMLAH
36 1 M' PEKERJAAN MEMASANG PLINT KERAMIK UK.20 X 30 CM
NO KEBUTUHAN SATUAN INDEKS
BAHAN
1 Plint Keramik Tile uk. 20 x 30 bj 3.333
2 Semen (PC) kg 1.140
3 Pasir pasang m³ 0.003
4 Semen Warna KG 0.100
TENAGA KERJA
1 Pekerja oh 0.090
2 Tukang Batu oh 0.090
3 Kepala Tukang oh 0.009
4 Mandor oh 0.005
TOTAL
PROFIT 15%
JUMLAH
37 1 M' PEKERJAAN MEMASANG PLINT KERAMIK UK.10 X 30 CM
NO KEBUTUHAN SATUAN INDEKS
BAHAN
1 Plint homogenius uk. 10 X 30 cm bh 3.333
2 Semen (PC) kg 1.650
3 Pasir pasang m³ 0.003
SNI 7395:2008

4 Semen Warna kg 0.100


TENAGA KERJA
1 Pekerja oh 0.060
2 Tukang Batu oh 0.030
3 Kepala Tukang oh 0.003
4 Mandor oh 0.003
TOTAL
PROFIT 15%
JUMLAH
38 1 m' PEKERJAAN LIST UK. 15 X 30 HOMOGENOUS TILE (CUTTING)
NO KEBUTUHAN SATUAN INDEKS
BAHAN
1 Border Homogenous tile uk. 15 x 30 (cutting) m 3.333
2 Semen (PC) kg 1.650
3 Pasir pasang m³ 0.003
SNI 7395:2008

4 Semen Warna kg 0.100


TENAGA KERJA
1 Pekerja oh 0.060
2 Tukang Batu oh 0.030
3 Kepala Tukang oh 0.003
4 Mandor oh 0.003
TOTAL
PROFIT 15%
JUMLAH
39 1 m PEKERJAAN MEMASANG STEP NOSING TANGGA uk 5X30 CM
NO KEBUTUHAN SATUAN INDEKS
BAHAN
1 Stepnosing keramik tile uk. 5 X 30 cm bj 3.333
2 Semen (PC) kg 0.850
3 Pasir pasang m³ 0.002
4 Semen Warna KG 0.080
TENAGA KERJA
1 Pekerja oh 0.090
2 Tukang Batu oh 0.090
3 Kepala Tukang oh 0.009
4 Mandor oh 0.005
TOTAL
PROFIT 15%
JUMLAH
41 1m PEKERJAAN MEMASANG KERAMIK uk 30X30 CM PADA TRAP TANGGA (STEPNOSING)
NO KEBUTUHAN SATUAN INDEKS
BAHAN
1 Keramik uk. 30 X 30 cm Rock Tile bj 3.333
2 Semen (PC) kg 8.360
3 Pasir pasang m³ 0.023
4 Semen Warna KG 0.900
TENAGA KERJA
1 Pekerja oh 0.250
2 Tukang Batu oh 0.120
3 Kepala Tukang oh 0.012
4 Mandor oh 0.013
TOTAL
PROFIT 15%
JUMLAH
40 1 M² PEKERJAAN MEMASANG DINDING KERAMIK UK.30 X 30 CM
NO KEBUTUHAN SATUAN INDEKS
BAHAN
1 Keramik uk. 30 X 30 cm bj 3.333
2 Semen (PC) kg 8.360
3 Pasir pasang m³ 0.023
4 Semen Warna KG 0.900
TENAGA KERJA
1 Pekerja oh 0.250
2 Tukang Batu oh 0.120
3 Kepala Tukang oh 0.012
4 Mandor oh 0.013
TOTAL
PROFIT 15%
JUMLAH
42 1 M² PEKERJAAN MEMASANG DINDING HOMOGENOUS TILE (HT-3) UK.30 X 60 CM
NO KEBUTUHAN SATUAN INDEKS
BAHAN
1 DINDING HOMOGENOUS TILE (HT-3) UK.30 X 60 CM M 1.050
2 Semen (PC) kg 10.000
3 Pasir pasang m³ 0.045
4 Semen Warna KG 1.620
TENAGA KERJA
1 Pekerja oh 0.700
2 Tukang Batu oh 0.350
3 Kepala Tukang oh 0.035
4 Mandor oh 0.035
TOTAL
PROFIT 15%
JUMLAH
43 1 M² PEKERJAAN MEMASANG DINDING HOMOGENOUS TILE (HT-3) UK.30 X 60 CM
NO KEBUTUHAN SATUAN INDEKS
BAHAN
1 DINDING HOMOGENOUS TILE (HT-3) UK.30 X 60 CM M 1.050
2 Semen (PC) kg 10.000
3 Pasir pasang m³ 0.045
4 Semen Warna KG 1.620
TENAGA KERJA
1 Pekerja oh 0.700
2 Tukang Batu oh 0.350
3 Kepala Tukang oh 0.035
4 Mandor oh 0.035
TOTAL
PROFIT 15%
JUMLAH
44 1 M² PEKERJAAN MEMASANG BATU ANDESITE
NO KEBUTUHAN SATUAN INDEKS
BAHAN M 1.050
1 Batu candi/batu alam/andersite
2 Semen (PC) kg 11.750
3 Pasir pasang m³ 0.035
TENAGA KERJA
1 Pekerja oh 0.620
2 Tukang Batu oh 0.350
3 Kepala Tukang oh 0.035
4 Mandor oh 0.030
TOTAL
PROFIT 15%
JUMLAH
45 1 M² PEKERJAAN MEMASANG DINDING BATU GRANIT
NO KEBUTUHAN SATUAN INDEKS
BAHAN M 1.050
1 Batu Granite Alam
2 Semen (PC) kg 10.000
3 Pasir pasang m³ 0.045
4 Semen Warna KG 1.620
TENAGA KERJA
1 Pekerja oh 0.700
2 Tukang Batu oh 0.350
3 Kepala Tukang oh 0.035
4 Mandor oh 0.035
TOTAL
PROFIT 15%
JUMLAH
46 1M PEKERJAAN MEMASANG NOSING GRANITE UK.30 X 60 CM
NO KEBUTUHAN SATUAN INDEKS
BAHAN
1 Granite tile uk. 30 x 60 M 1.667
2 Semen (PC) kg 10.000
3 Pasir pasang m³ 0.045
SNI 7395:2008

4 Semen Warna KG 1.500


TENAGA KERJA
1 Pekerja oh 0.700
2 Tukang Batu oh 0.350
3 Kepala Tukang oh 0.035
4 Mandor oh 0.035
TOTAL
PROFIT 15%
JUMLAH

PEKERJAAN ATAP
48 1 M² Penutup atap Steel Roof 0.5 Klip-Lok Colourbond
NO KEBUTUHAN SATUAN INDEKS
BAHAN M² M² 1,050
Penutup atap aluminium foil + bubble aksesoris ls 1,050
TENAGA KERJA OH OH OH OH
1,000
Pekerja Tukang Besi Kepala Tukang Mandor 0,200
0,200
0,025
0,010

TOTAL
PROFIT 15%
JUMLAH
49 1 M² PEKERJAAN GENTENG GLAZUR
NO KEBUTUHAN SATUAN INDEKS
BAHAN BH M² M² 18,000
Genteng glazur aluminium foil + bubble Wiremess OH OH OH OH
1,050
TENAGA KERJA 1,050
Pekerja Tukang kayu Kepala Tukang Mandor 0,150
0,075
0,008
0,008

TOTAL
PROFIT 15%
JUMLAH
49 1M PEKERJAAN BUMBUNGAN
NO KEBUTUHAN SATUAN INDEKS
BAHAN m' LS 5,000
Bumbungan glazur PERLENGKAPAN kg m³ 1,000
Semen (PC) Pasir pasang OH OH OH 8,000
TENAGA KERJA OH 0,032
Pekerja Tukang Besi Kepala Tukang 0,400
Mandor 0,200
0,020
0,020

TOTAL
NO. URAIAN SATUAN INDEKS
PROFIT 15%
JUMLAH
50 1 M PEKERJAAN PARAPET FLASHING
NO KEBUTUHAN SATUAN INDEKS
BAHAN m LS 1,000
Plashing parapet PERLENGKAPAN OH OH OH 1,000
TENAGA KERJA OH 0,200
NON STANDAR

Pekerja Tukang Besi Kepala Tukang 0,200


Mandor 0,025
0,010

TOTAL
PROFIT 15%
JUMLAH
51 1 M PEKERJAAN NOK PINGGIR
NO KEBUTUHAN SATUAN INDEKS
BAHAN m' LS 1,064
Nok pinggir PERLENGKAPAN OH OH OH OH
1,000
TENAGA KERJA 0,200
NON STANDAR Pekerja Tukang Besi Kepala Tukang Mandor 0,200
0,025
0,010

TOTAL
PROFIT 15%
JUMLAH
50 1 M PEKERJAAN LIST PLANK GRC 9mm
NO KEBUTUHAN SATUAN INDEKS
BAHAN LBR M 2,100
GRC 9 mm bh kg 2,100
Besi hollow untuk plafond Paku ramset OH OH OH 3,000
Alkasit OH 0,500
NON STANDAR

TENAGA KERJA 0,200


Pekerja Tukang Besi Kepala Tukang 0,200
Mandor 0,025
0,010

TOTAL
PROFIT 15%
JUMLAH
51 1 M PEKERJAAN LIST PLANK STEEL ROOF 0.5 KLIP-LOK COLOURBOND
NO KEBUTUHAN SATUAN INDEKS
BAHAN LBR M 0,600
LIST PLANK STEEL ROOF 0.5 KLIP-LOK COLOURBOND m2 4,200
rangka besi hollow Paku ramset OH OH OH OH
3,000
TENAGA KERJA 0,200
NON STANDAR

Pekerja Tukang Besi Kepala Tukang Mandor 0,200


0,025
0,010

TOTAL
PROFIT 15%
JUMLAH
PEKERJAAN SANITAIR
51 1 M³ PEKERJAAN MEMASANG MONOBLOCK
NO KEBUTUHAN SATUAN INDEKS
BAHAN
1 Monoblock SET 1.000
2 Perlengkapan ls 1.000
TENAGA KERJA
1 Pekerja oh 0.167
2 Tukang Batu oh 0.167
3 Kepala Tukang oh 0.083
4 Mandor oh 0.067
TOTAL
PROFIT 15%
JUMLAH
52 1 M³ PEKERJAAN MEMASANG URINOIR
NO KEBUTUHAN SATUAN INDEKS
BAHAN
1 Urinoir U57M SET 1.000
2 Perlengkapan ls 1.000
TENAGA KERJA
1 Pekerja oh 0.150
2 Tukang Batu oh 0.150
3 Kepala Tukang oh 0.075
4 Mandor oh 0.060
TOTAL
PROFIT 15%
JUMLAH
53 1 M³ PEKERJAAN MEMASANG PARTISI URINOIR
NO KEBUTUHAN SATUAN INDEKS
BAHAN
1 Partisi urionoir (A100) BH 1.000
2 Perlengkapan ls 1.000
TENAGA KERJA
1 Pekerja oh 0.067
2 Tukang Batu oh 0.067
3 Kepala Tukang oh 0.033
4 Mandor oh 0.027
TOTAL
PROFIT 15%
JUMLAH
54 1 UNIT PEKERJAAN MEMASANG CUBICAL TOILET
NO KEBUTUHAN SATUAN INDEKS
BAHAN
1 Cubical Toilet /Terpasang (L) UNIT 1.000
2 On site material ls 1.000
TOTAL
PROFIT 15%
JUMLAH
55 1 UNIT PEKERJAAN MEMASANG WASTAFEL UNDER COUNTER
NO KEBUTUHAN SATUAN INDEKS
BAHAN
1 Wastafel under counter Complete Set SET 1.000
2 Semen (PC) kg 6.000
3 Pasir pasang m³ 0.010
TENAGA KERJA
1 Pekerja oh 0.117
2 Tukang Batu oh 0.117
3 Kepala Tukang oh 0.058
4 Mandor oh 0.047
TOTAL
PROFIT 15%
JUMLAH
56 1 UNIT PEKERJAAN COVE LAMPU WASTAFEL
NO KEBUTUHAN SATUAN INDEKS
BAHAN
1 Kap lampu diaatas wastafel M2 1.000
2 Perlengkapan ls 1.000
TENAGA KERJA
1 Pekerja oh 0.050
2 Tukang Batu oh 0.050
3 Kepala Tukang oh 0.025
4 Mandor oh 0.020
TOTAL
PROFIT 15%
JUMLAH
57 1 M³ PEKERJAAN MEMASANG TOP TABLE GRANITE
NO KEBUTUHAN SATUAN INDEKS
BAHAN
1 Tob table Granite wastafel M2 1.000
2 Perlengkapan ls 1.000
TENAGA KERJA
1 Pekerja oh 0.183
2 Tukang Batu oh 0.183
3 Kepala Tukang oh 0.092
4 Mandor oh 0.073
TOTAL
PROFIT 15%
JUMLAH
58 1 SET PEKERJAAN MEMASANG SHOWER SPRAY
NO KEBUTUHAN SATUAN INDEKS
BAHAN
1 Shower spray (TB 19 CS MCR) SET 1.000
2 Perlengkapan ls 1.000
TENAGA KERJA
1 Pekerja oh 0.050
2 Tukang Batu oh 0.025
3 Kepala Tukang oh 0.033
4 Mandor oh 0.023
TOTAL
PROFIT 15%
JUMLAH
59 1 BH PEKERJAAN MEMASANG TISSUE HOLDER
NO KEBUTUHAN SATUAN INDEKS
BAHAN
1 Tissue holder AW360J BH 1.000
2 Perlengkapan ls 1.000
TENAGA KERJA
1 Pekerja oh 0.017
2 Tukang Batu oh 0.008
3 Kepala Tukang oh 0.011
4 Mandor oh 0.008
TOTAL
PROFIT 15%
JUMLAH
60 1 BH PEKERJAAN MEMASANG SOAP DISH
NO KEBUTUHAN SATUAN INDEKS
BAHAN
1 Soap dish BH 1.000
2 Perlengkapan ls 1.000
TENAGA KERJA
1 Pekerja oh 0.017
2 Tukang Batu oh 0.008
3 Kepala Tukang oh 0.011
4 Mandor oh 0.008
TOTAL
PROFIT 15%
JUMLAH
61 1 BH PEKERJAAN MEMASANG KRAN
NO KEBUTUHAN SATUAN INDEKS
BAHAN
1 Kran T23B13V7NB BH 1.000
2 Perlengkapan ls 1.000
TENAGA KERJA
1 Pekerja oh 0.033
2 Tukang Batu oh 0.017
3 Kepala Tukang oh 0.022
4 Mandor oh 0.015
TOTAL
PROFIT 15%
JUMLAH
62 1 BH PEKERJAAN MEMASANG FLOOR DRAIN
NO KEBUTUHAN SATUAN INDEKS
BAHAN
1 Floor drain stainless BH 1.000
2 Perlengkapan ls 1.000
TENAGA KERJA
1 Pekerja oh 0.042
2 Tukang Batu oh 0.021
3 Kepala Tukang oh 0.028
4 Mandor oh 0.019
TOTAL
PROFIT 15%
JUMLAH
63 1 BH PEKERJAAN MEMASANG SOAP HOLDER
NO KEBUTUHAN SATUAN INDEKS
BAHAN
1 Soap Holder BH 1.000
2 Perlengkapan ls 1.000
TENAGA KERJA
1 Pekerja oh 0.017
2 Tukang Batu oh 0.008
3 Kepala Tukang oh 0.011
4 Mandor oh 0.008
TOTAL
PROFIT 15%
JUMLAH
64 1 SET PEKERJAAN MEMASANG ZINK DUA LUBANG
NO KEBUTUHAN SATUAN INDEKS
BAHAN
1 Zink Dua lubang SET 1.000
2 Perlengkapan ls 1.000
TENAGA KERJA
1 Pekerja oh 0.125
2 Tukang Batu oh 0.063
3 Kepala Tukang oh 0.083
4 Mandor oh 0.058
TOTAL
PROFIT 15%
JUMLAH
65 1 SET PEKERJAAN MEMASANG ZINK SATU LUBANG
NO KEBUTUHAN SATUAN INDEKS
BAHAN
1 Zink Satu lubang SET 1.000
2 Perlengkapan ls 1.000
TENAGA KERJA
1 Pekerja oh 0.083
2 Tukang Batu oh 0.042
3 Kepala Tukang oh 0.056
4 Mandor oh 0.038
TOTAL
PROFIT 15%
JUMLAH
66 1 SET PEKERJAAN MEMASANG KRAN ZINK
NO KEBUTUHAN SATUAN INDEKS
BAHAN
1 Kran Zink T30ARQ13N SET 1.000
2 Perlengkapan ls 1.000
TENAGA KERJA
1 Pekerja oh 0.080
2 Tukang Batu oh 0.040
3 Kepala Tukang oh 0.053
4 Mandor oh 0.037
TOTAL
PROFIT 15%
JUMLAH
67 1 SET PEKERJAAN MEMASANG KACA CERMIN
NO KEBUTUHAN SATUAN INDEKS
BAHAN
1 Kaca Cermin SET 1.000
2 Perlengkapan ls 1.000
TENAGA KERJA
1 Pekerja oh 0.017
2 Tukang Batu oh 0.008
3 Kepala Tukang oh 0.011
4 Mandor oh 0.008
TOTAL
PROFIT 15%
JUMLAH
68 1 SET PEKERJAAN MEMASANG KLOSET JONGKOK
NO KEBUTUHAN SATUAN INDEKS
BAHAN
1 Kloset Jongkok SET 1.000
2 Semen Portland kg 6.000
3 Pasir Pasang m3 0.010
TENAGA KERJA
1 Pekerja oh 1.000
2 Tukang Batu oh 1.500
3 Kepala Tukang oh 1.500
4 Mandor oh 0.160
TOTAL
PROFIT 15%
JUMLAH
69 1 M³ PEKERJAAN MEMASANG WASTAFEL WALLHUNG
NO KEBUTUHAN SATUAN INDEKS
BAHAN
1 Wastafel Wall hung Complete Set SET 1.000
2 Perlengkapan ls 1.000
TENAGA KERJA
1 Pekerja oh 0.083
2 Tukang Batu oh 0.042
3 Kepala Tukang oh 0.056
4 Mandor oh 0.038
TOTAL
PROFIT 15%
JUMLAH
PEKERJAAN PENGECATAN
68 1 M² PEKERJAAN PENGECATAN INTERIOR
NO KEBUTUHAN SATUAN INDEKS
BAHAN
PLAMIR KG 0.100
ALKALIN ltr 0.200
CAT TEMBOK ltr 0.250
SNI 7394:2008

ROOL CAT BH 0.050


AMPLAS LBR 0.200
TENAGA KERJA
1 Pekerja oh 0.040
2 Tukang Cat oh 0.125
3 Kepala Tukang oh 0.013
4 Mandor oh 0.002
TOTAL
PROFIT 15%
JUMLAH
69 1 M² PEKERJAAN PENGECATAN EXTERIOR
NO KEBUTUHAN SATUAN INDEKS
BAHAN
ALKALIN ltr 0.200
PLAMIR KG 0.050
CAT TEMBOK ltr 0.400
SNI 7394:2008

ROOL CAT BH 0.050


AMPLAS lbr 0.200
TENAGA KERJA
1 Pekerja oh 0.040
2 Tukang Cat oh 0.125
3 Kepala Tukang oh 0.013
4 Mandor oh 0.002
TOTAL
PROFIT 15%
JUMLAH
70 1 M² PEKERJAAN PENGECATAN WATER BASE
NO KEBUTUHAN SATUAN INDEKS
BAHAN
:2008
PLAMIR KG 0.050
Cat Water Base (Majestic Pearl silk) ltr 0.400
ROOL CAT BH 0.050

SNI 7394:2008
AMPLAS lbr 0.200
TENAGA KERJA
1 Pekerja oh 0.040
2 Tukang Cat oh 0.125
3 Kepala Tukang oh 0.013
4 Mandor oh 0.002
TOTAL
PROFIT 15%
JUMLAH
PEKERJAAN SCREED LANTAI
72 1 m2 SCREED LANTAI 1 PC : 3 PS, TEBAL 5 CM
NO KEBUTUHAN SATUAN INDEKS
BAHAN
1 PC (40 KG) ZAK 0.250
2 PASIR BETON M3 0.046
TENAGA KERJA
1 PEKERJA OH 0.220
2 TUKANG BATU SETENGAH TERAMPIL OH 0.011
3 KEPALA TUKANG BATU OH 0.036
4 MANDOR OH 0.018
PERALATAN
1 ALAT BANTU LS 1.000
TOTAL
PROFIT 15%
JUMLAH
73 1 m PEKERJAAN NOSING KERAMIK UK. 30 X 30
SNI 7395:2008

NO KEBUTUHAN SATUAN INDEKS


BAHAN M 1.050
1 Keramik uk. 30 x 30
2 Semen (PC) kg 1.140
3 Pasir pasang m³ 0.003
4 Semen Warna KG 0.025
TENAGA KERJA
1 Pekerja oh 0.090
2 Tukang Batu oh 0.090
3 Kepala Tukang oh 0.009
4 Mandor oh 0.005
TOTAL
PROFIT 15%
JUMLAH

74 1 M² PEKERJAAN MEMASANG DINDING HOMOGENOUS TILE 60X60


NO KEBUTUHAN SATUAN INDEKS
SNI 7395:2008
BAHAN m2 1.050
1 HM TILE UK. 60X60
2 Semen (PC) kg 10.000
3 Pasir pasang m³ 0.045
4 Semen Warna KG 1.620
TENAGA KERJA
1 Pekerja oh 0.700

2 Tukang Batu oh 0.350


3 Kepala Tukang oh 0.035
4 Mandor oh 0.035
TOTAL
PROFIT 15%
JUMLAH
75 1 M² MEMASANG PLAFOND GYPSUM BOARD UK. 1.2 X 2.4 X 9 MM
NO KEBUTUHAN SATUAN INDEKS
BAHAN
1 Gypsum board (UK. 120 X 240 X 0.09 CM) LBR 0.347
2 Suspensi bracket pcs 0.990
3 Suspensi Rod lm 0.590
4 Suspensi clip pcs 0.990
5 Top cross rail lm 1.190
6 Connector pcs 2.000
SNI 2839:2008

7 Furring Channel lm 2.600


8 Wall angle lm 0.200
9 skrup BH 12.000
10 Kain Kasa M 1.000
11 Alkasit KG 0.500
12 Paku ramset+misiu BH 2.000
TENAGA KERJA
1 Pekerja oh 0.100
2 Kepala Tukang oh 0.005
3 Mandor oh 0.005
TOTAL
PROFIT 15%
JUMLAH
76 1 m2 PEKERJAAN REST FLOOR 150 MM
NO KEBUTUHAN SATUAN INDEKS
BAHAN
1 Rest Floor 150 (mm) FS 800 HPL-K m2 1.050
2 Ongkos Pasang m2 1.000
TOTAL
PROFIT 15%
JUMLAH
77 1m RAILLING TANGGA
NO KEBUTUHAN INDEKS SATUAN
BAHAN
Pipa Stainless steel Ø 2.5" m 1.000
Hollow Stainless steel 30 x 50 m 2.000
Hollow Stainless steel 10 x 50 m 2.000
Hollow Stainless steel 50 x 50 m 1.000
PABRIKASI LS 1.000
UPAH PASANG
1 Pekerja oh 0.100
2 Tukang Kayu oh 0.100
3 Kepala Tukang oh 0.010
4 Mandor oh 0.010
TOTAL
PROFIT 15%
JUMLAH
78 1m HAND RAILLING
NO KEBUTUHAN INDEKS SATUAN
BAHAN
Pipa Stainless steel Ø 2.5" m 1.100
Flange Ø 2,5" BH 1.000
PABRIKASI LS 1.000
UPAH PASANG
1 Pekerja oh 0.100
2 Tukang Kayu oh 0.080
3 Kepala Tukang oh 0.010
4 Mandor oh 0.010
TOTAL
PROFIT 15%
JUMLAH
79 1m RAILLING
BAHAN
Pipa steel Ø 2.5" m 1.100
Pipa steel Ø 0.1" m 2.100
Pipa steel Ø 2" m 2.900
PABRIKASI LS 1.000
UPAH PASANG
1 Pekerja oh 0.100
2 Tukang Kayu oh 0.100
3 Kepala Tukang oh 0.010
4 Mandor oh 0.010
TOTAL
PROFIT 15%
JUMLAH
80 1 m2 TRALIS JENDELA
NO KEBUTUHAN INDEKS SATUAN
BAHAN
1 Besi nako t=10mm 1 M2
2 Plat Strip t=3mm 1 M2
3 Finishing 1 LS
4 Pemasangan 1 LS
TOTAL
PROFIT 15%
JUMLAH
81 1 Unit Double steel Door 1600x2150x55
NO KEBUTUHAN INDEKS SATUAN
Pintu besi 2.00 unit
Pekuatan Kusen dengan kolom praktis 0.10 m3
Biaya instal 0.10 lot
Handle 1.00 bh
Hinges 407 USP 3.00 unit
Door Closer DCL 28A .2-6 RA S 1.00 unit
TOTAL
PROFIT 15%
82 JUMLAH
Unit Single fire Door 1200x2150x55 Rp
NO. URAIAN SATUAN INDEKS
NO KEBUTUHAN INDEKS SATUAN
Pintu besi 1.00 unit
Pekuatan Kusen dengan kolom praktis 0.06 m3
Biaya instal 0.10 lot
Panic Exit Devices 59010-10 + 07077-49 Black 2.00 bh
Set of bolt 07063 Blck 1.00 bh
Hinges 407 USP 6.00 bh
Door Closer DCL 28A .2-6 RA S 1.00 unit
TOTAL
PROFIT 15%
JUMLAH
Unit JENDELA B-H
NO KEBUTUHAN INDEKS SATUAN
BAHAN 7,80 m bh ls
Hollow Stainless steel 80 x 80 44,20 OH OH OH
Hollow Stainless steel 20 x 40 PABRIKASI 1,00 OH
UPAH PASANG 0,10
Pekerja Tukang Besi Kepala Tukang 0,10
Mandor 0,01
0,00

TOTAL
PROFIT 15%
JUMLAH
85 1 m2 PEKERJAAN ALUMUNIUM COMPOSIT PANEL
NO KEBUTUHAN INDEKS SATUAN
BAHAN 1,00 m2 m1 ls
Alumunium Composit Panel 4 mm Rangka alumunium holoow 40 x 40 cm4,20
Acsesories ls
Ongkos Pasang 1,00
1,00

TOTAL
PROFIT 15%
JUMLAH
#REF! 1 m1 PEKERJAAN MEMASANG PLINT DUK LAPIS GRANIT TILE T. 10 cm
NO KEBUTUHAN SATUAN INDEKS
BAHAN
1 Bata merah BH 4.500
2 Semen (PC) kg 3.420
3 Pasir pasang m³ 0.030
4 Semen Warna kg 0.025
5 Granit Tile uk. 60 x 15 (bagian tepi dipingul) m1 1.667
6 Granit Tile uk. 60 x 10 m1 1.667
TENAGA KERJA
1 Pekerja oh 0.090
2 Tukang Batu oh 0.090
3 Kepala Tukang oh 0.009
4 Mandor oh 0.005
TOTAL
PROFIT 15%
JUMLAH
#REF! 1 m1 PEKERJAAN MEMASANG SALURAN KELILING GEDUNG U 40 CM
NO KEBUTUHAN SATUAN INDEKS
BAHAN
1 U 40 cm bh 1.000
2 Galian Tanah kg 0.165
3 Buangan Tanah m³ 0.165
4 Pasangan Bata kg 0.550
5 Plesteran m1 1.100
6 Acian m1 1.100
TENAGA KERJA
1 Pekerja oh 0.090
2 Tukang Batu oh 0.090
3 Kepala Tukang oh 0.009
4 Mandor oh 0.005
TOTAL
PROFIT 15%
JUMLAH
1 m2 PEKERJAAN ALUMUNIUM COMPOSIT PANEL dg OVER ± 30 CM dari dinding
NO KEBUTUHAN INDEKS SATUAN
BAHAN
Alumunium Composit Panel 4 mm M2 1.000
Rangka alumunium holoow 40 x 40 cm M2 5.200
Acsesories LS 1.000
Ongkos Pasang LS 1.000
TOTAL
PROFIT 15%
JUMLAH
unit CURTAIN WALL TYPE 1
NO KEBUTUHAN SATUAN INDEKS
BAHAN
Profil alumunium Mellion 50x100 (vertikal m 61.650
Profil alumunium Transom (horisontal) m 24.000
Kaca Stopsol 8 mm m2 36.990
Accessories bh 18.000
Galzing Gasket m' 85.650
Sealant m 171.300
Alat Bantu ls 1.000
Upah Pasang ls 0.025
TOTAL
PROFIT 15%
JUMLAH
#REF! unit CURTAIN WALL TYPE 2
NO KEBUTUHAN SATUAN INDEKS
BAHAN
Profil alumunium Mellion 50x100 (vertikal m 27.300
Profil alumunium Transom (horisontal) m 30.500
Kaca Stopsol 8 mm m2 23.790
Accessories bh 24.000
Galzing Gasket m' 57.800
Sealant m 115.600
Alat Bantu ls 1.000
Upah Pasang ls 0.025
TOTAL
PROFIT 15%
JUMLAH
#REF! unit CURTAIN WALL TYPE 3
NO KEBUTUHAN SATUAN INDEKS
BAHAN
Profil alumunium Mellion 50x100 (vertikal m 16.500
Profil alumunium Transom (horisontal) m 19.400
Kaca Stopsol 8 mm m2 13.338
Accessories bh 20.000
Galzing Gasket m' 35.900
Sealant m 71.800
Alat Bantu ls 1.000
Upah Pasang ls 0.025
TOTAL
PROFIT 15%
JUMLAH
#REF! unit CURTAIN WALL TYPE 4
NO KEBUTUHAN SATUAN INDEKS
BAHAN
Profil alumunium Mellion 50x100 (vertikal m 19.250
Profil alumunium Transom (horisontal) m 24.400
Kaca Stopsol 8 mm m2 16.714
Accessories bh 24.000
Galzing Gasket m' 43.650
Sealant m 87.300
Alat Bantu ls 1.000
Upah Pasang ls 0.025
TOTAL
PROFIT 15%
JUMLAH
1 unit PEKERJAAN SUN LOUVRE HD Luxalon 84R
NO KEBUTUHAN SATUAN INDEKS
BAHAN
AL Stinger SL 4 @4m' pcs 0.400
AL Panel 84R 0,6 LX Pure White M' 10.000
Hollow 40x40x5mm + Powder Coating pcs 0.600
Paku Peluru + Siku Penggantung pcs 1.000
Biaya Instalasi LS 1.000
TOTAL
PROFIT 15%
JUMLAH
m' PEKERJAAN PEMASANGAN U DITCH UK 40X50 MUTU K-350
NO KEBUTUHAN SATUAN INDEKS
BAHAN
1 Bata merah BH 4.500
2 Semen (PC) kg 3.420
3 Pasir pasang m³ 0.030
4 Semen Warna kg 0.025
5 Granit Tile uk. 60 x 15 (bagian tepi dipingul) m1 1.667
6 Granit Tile uk. 60 x 10 m1 1.667
TENAGA KERJA
1 Pekerja oh 0.090
2 Tukang Batu oh 0.090
3 Kepala Tukang oh 0.009
4 Mandor oh 0.005
TOTAL
PROFIT 15%
JUMLAH
m' BAK KONTROL UK 60X60CM
NO KEBUTUHAN SATUAN INDEKS
Bak Kontrol uk 60x60cm m' 1.000
alat bantu unit 1.000
upah pasang unit 1.000
TOTAL
PROFIT 15%
JUMLAH
AN LAPANGAN
GA TEKNIK LISTRIK INDUSTRI

HARGA SATUAN JUMLAH

HARGA SATUAN JUMLAH

101000 10,100.00
111100 11,110.00
116150 1,161.50
121200 606.00
22,977.50
3,446.63
26,424.13

HARGA SATUAN JUMLAH

4545 81,810.00
277750 9,165.75
1262.5 3,535.00
5050 5,050.00

101000 32,320.00
111100 13,332.00
116150 1,393.80
121200 1,818.00
148,424.55
22,263.68
170,688.23

HARGA SATUAN JUMLAH


- -
4545 56,812.50
277750 5,832.75
1262.5 3,156.25
5050 5,050.00

101000 32,320.00
111100 13,332.00
116150 1,393.80
121200 1,818.00
119,715.30
17,957.30
137,672.60

HARGA SATUAN JUMLAH


- -
3737000 149,480.00
15150 6,060.00
10100 2,020.00
4040000 60,600.00
121200 42,420.00
20200 40,400.00

101000 66,660.00
111100 36,663.00
116150 3,832.95
121200 3,999.60
412,135.55
61,820.33
473,955.88

HARGA SATUAN JUMLAH


- -
3737000 149,480.00
15150 6,060.00
10100 2,020.00
4040000 72,720.00
121200 42,420.00
20200 40,400.00

101000 66,660.00
111100 36,663.00
116150 3,832.95
121200 3,999.60
424,255.55
63,638.33
487,893.88
Rp -
HARGA SATUAN JUMLAH
- -
3737000 112,110.00
15150 6,060.00
10100 2,020.00
4040000 80,800.00
121200 42,420.00
20200 60,600.00
101000 66,660.00
111100 36,663.00
116150 3,832.95
121200 3,999.60
415,165.55
62,274.83
477,440.38

HARGA SATUAN JUMLAH


- -
10605 11,135.25
17170 2,575.50

101,000 7,070.00
111,100 5,555.00
116,150 813.05
121,200 484.80
27,633.60
4,145.04
31,778.64
Rp -
HARGA SATUAN JUMLAH
- -
11110 11,665.50
17170 2,575.50

101,000 7,070.00
111,100 7,777.00
116,150 813.05
121,200 484.80
30,385.85
4,557.88
34,943.73

HARGA SATUAN JUMLAH


- -
14140 16,850.64
17170 8,585.00

101,000 14,140.00
111,100 15,554.00
116,150 1,626.10
121,200 969.60
57,725.34
8,658.80
66,384.14

HARGA SATUAN JUMLAH


- -
12120 12,726.00
17170 2,575.50

101,000 14,140.00
111,100 15,554.00
116,150 1,626.10
121,200 969.60
47,591.20
7,138.68
54,729.88

HARGA SATUAN JUMLAH


- -
1262.5 411,575.00
303000 164,529.00
277750 211,645.50
10.1 2,171.50

101,000 166,650.00
111,100 30,552.50
116,150 3,252.20
121,200 10,059.60
1,000,435.30
150,065.30
1,150,500.60
Rp -
HARGA SATUAN JUMLAH
- -
1262.5 484,800.00
303000 149,682.00
277750 213,867.50
10.1 2,171.50

101000 166,650.00
111100 30,552.50
116150 3,252.20
121200 10,059.60
1,061,035.30
159,155.30
1,220,190.60

HARGA SATUAN JUMLAH


- -
1262.5 521,412.50
303000 147,258.00
277750 209,979.00
10.1 2,171.50

101000 166,650.00
111100 30,552.50
116150 3,252.20
121200 10,059.60
1,091,335.30
163,700.30
1,255,035.60

HARGA SATUAN JUMLAH


- -
900000 900,000.00
5050 5,050.00

101000 166,650.00
111100 30,552.50
116150 3,252.20
121200 10,059.60
1,115,564.30
167,334.65
1,282,898.95
Rp -
HARGA SATUAN JUMLAH
- -
950000 950,000.00
5050 5,050.00

101000 166,650.00
111100 30,552.50
116150 3,252.20
121200 10,059.60
1,165,564.30
174,834.65
1,340,398.95
Rp -
HARGA SATUAN JUMLAH
- -
1020000 1,020,000.00
5050 5,050.00

101000 166,650.00
111100 30,552.50
116150 3,252.20
121200 10,059.60
1,235,564.30
185,334.65
1,420,898.95
Rp -
HARGA SATUAN JUMLAH
- -
1100000 1,100,000.00
5050 5,050.00

101000 166,650.00
111100 30,552.50
116150 3,252.20
121200 10,059.60
1,315,564.30
197,334.65
1,512,898.95
Rp -
HARGA SATUAN JUMLAH
- -
1000000 1,000,000.00
5050 5,050.00

101000 166,650.00
111100 30,552.50
116150 3,252.20
121200 10,059.60
1,215,564.30
182,334.65
1,397,898.95

HARGA SATUAN JUMLAH


- -

- -
-
-
-
Rp -
HARGA SATUAN JUMLAH
- -

- -
-
-
-

HARGA SATUAN JUMLAH


- -

- -
- -
- -

- -
- -
- -
- -
-

HARGA SATUAN JUMLAH


- -
1,282,898.95 1,347,043.89
31,778.64 6,020,272.68
-
236,977.94 1,151,949.77
-
8,519,266.34
1,277,889.95
9,797,156.29

HARGA SATUAN JUMLAH


- -
1,150,500.60 1,208,025.62
31,778.64 7,224,333.57
-
236,977.94 2,843,735.30
11,276,094.49
1,691,414.17
12,967,508.66

HARGA SATUAN JUMLAH


- -
1,150,500.60 1,208,025.62
31,778.64 5,779,485.92
-
236,977.94 1,228,730.63
8,216,242.17
1,232,436.33
9,448,678.50
HARGA SATUAN JUMLAH

1,150,500.60 1,208,025.62
31,778.64 7,224,333.57
-
236,977.94 1,579,931.93
10,012,291.13
1,501,843.67
11,514,134.80

HARGA SATUAN JUMLAH


- -
60600 21,028.20
10100 40,400.00
505 2,020.00
1515 6,060.00
1010 4,040.00
2020 8,080.00
5050 5,050.00
3030 1,515.00
505 6,060.00

101000 10,100.00
111100 5,555.00
116150 580.75
121200 606.00
111,094.95
16,664.24
127,759.19

HARGA SATUAN JUMLAH


- -
90900 31,542.30
10100 40,400.00
505 2,020.00
1515 6,060.00
1010 4,040.00
2020 8,080.00
5050 5,050.00
3030 1,515.00
505 6,060.00

101000 10,100.00
111100 5,555.00
116150 580.75
121200 606.00
121,609.05
18,241.36
139,850.41
Rp -
HARGA SATUAN JUMLAH
- -
65650 98,475.00
12120 80,804.04
505 6,565.00
1515 19,695.00
1010 13,130.00
2020 27,270.00
-
101000 10,100.00
111100 11,110.00
116150 1,161.50
121200 606.00
268,916.54
40,337.48
309,254.02
Rp -
HARGA SATUAN JUMLAH
- -

- -
- -

- -
- -
- -
- -
-
-
-

HARGA SATUAN JUMLAH


- -
1262.5 9,817.20
277750 6,388.25
- -
101000 30,300.00
111100 16,665.00
116150 1,742.25
121200 1,818.00
66,730.70
10,009.61
76,740.31

HARGA SATUAN JUMLAH


- -
1262.5 6,544.80
277750 7,221.50

101000 30,300.00
111100 16,665.00
116150 1,742.25
121200 1,818.00
64,291.55
9,643.73
73,935.28
Rp -
HARGA SATUAN JUMLAH
- -
1515 30,300.00

101000 30,300.00
111100 16,665.00
116150 1,742.25
121200 1,818.00
80,825.25
12,123.79
92,949.04
Rp -
HARGA SATUAN JUMLAH
- -
1515 3,333.00

101000 15,150.00
111100 11,110.00
116150 1,161.50
121200 969.60
31,724.10
4,758.62
36,482.72
Rp -
HARGA SATUAN JUMLAH
- -
1262.5 631.25
277750 3,610.75

101000 8,080.00
111100 44,440.00
116150 4,646.00
121200 484.80
61,892.80
9,283.92
71,176.72
Rp -
HARGA SATUAN JUMLAH
- -
1515 2,461.88

101000 7,575.00
111100 5,555.00
116150 580.75
121200 484.80
16,657.43
2,498.61
19,156.04
Rp -
HARGA SATUAN JUMLAH
- -
1515 2,461.88

101000 10,100.00
111100 7,443.70
116150 813.05
121200 606.00
21,424.63
3,213.69
24,638.32
Rp -
HARGA SATUAN JUMLAH
- -
3131 6,888.20

101000 28,886.00
111100 23,775.40
116150 2,439.15
121200 2,424.00
64,412.75
9,661.91
74,074.66
HARGA SATUAN JUMLAH
- -
707 49,490.00
1262.5 18,142.13
277750 11,110.00
-
101000 30,300.00
111100 11,110.00
116150 1,161.50
121200 1,818.00
123,131.63
18,469.74
141,601.37

HARGA SATUAN JUMLAH


- -
25250 631,250.00
1262.5 9,071.06
277750 11,110.00
-
101000 30,300.00
111100 11,110.00
116150 1,161.50
121200 1,818.00
695,820.56
104,373.08
800,193.65

HARGA SATUAN JUMLAH


- -
707 49,490.00
1262.5 12,221.00
277750 12,498.75
-
101000 30,300.00
111100 11,110.00
116150 1,161.50
121200 1,818.00
118,599.25
17,789.89
136,389.14

HARGA SATUAN JUMLAH


- -
83830 88,021.50
1262.5 14,429.11

101000 30,300.00
111100 11,110.00
116150 1,161.50
121200 1,818.00
146,840.11
22,026.02
168,866.13
Rp -
HARGA SATUAN JUMLAH
- -

- -
- -
- -
- -
- -

- -
- -
- -
- -
-
-
-

HARGA SATUAN JUMLAH


- -
55550 58,327.50
1262.5 10,302.00
277750 6,388.25
2020 1,818.00

101000.000 25,250.00
111100.000 13,332.00
116150.000 1,393.80
121200.000 1,575.60
118,387.15
17,758.07
136,145.22
HARGA SATUAN JUMLAH
- -
65,650 68,932.50
1,263 12,625.00
277,750 12,498.75
2,020 3,030.00
- -
101,000 26,260.00
111,100 14,443.00
116,150 1,509.95
121,200 1,575.60
140,874.80
21,131.22
162,006.02

HARGA SATUAN JUMLAH


- -
181,800 190,890.00
1,263 10,339.88
277,750 12,498.75
2,020 2,020.00

101,000 25,250.00
111,100 13,332.00
116,150 1,393.80
121,200 1,575.60
257,300.03
38,595.00
295,895.03

HARGA SATUAN JUMLAH


- -
3636 10,908.00

101,000 12,120.00
111,100 13,332.00
116,150 1,393.80
121,200 727.20
38,481.00
5,772.15
44,253.15

HARGA SATUAN JUMLAH


- -
45450 47,722.50
1,263 10,554.50
277,750 6,388.25
2,020 1,818.00
-
101,000 25,250.00
111,100 13,332.00
116,150 1,393.80
121,200 1,575.60
108,034.65
16,205.20
124,239.85

HARGA SATUAN JUMLAH


- -
55550 92,601.85
1,263 1,439.25
277,750 833.25
2,020 50.50

101,000 9,090.00
111,100 9,999.00
116,150 1,045.35
121,200 606.00
115,665.20
17,349.78
133,014.98
Rp -
HARGA SATUAN JUMLAH
- -
55550 92,601.85
1,263 2,083.13
277,750 833.25
2,020 202.00

101,000 9,090.00
111,100 9,999.00
116,150 1,045.35
121,200 606.00
116,460.58
17,469.09
133,929.66
Rp -
HARGA SATUAN JUMLAH
- -
15150 50,494.95
1,263 1,439.25
277,750 833.25
2,020 202.00

101,000 9,090.00
111,100 9,999.00
116,150 1,045.35
121,200 606.00
73,709.80
11,056.47
84,766.27
Rp -
HARGA SATUAN JUMLAH
- -
25250 84,158.25
1,263 2,083.13
277,750 833.25
2,020 202.00

101,000 6,060.00
111,100 3,333.00
116,150 348.45
121,200 363.60
97,381.68
14,607.25
111,988.93
Rp -
HARGA SATUAN JUMLAH
- -
55550 185,148.15
1,263 2,083.13
277,750 833.25
2,020 202.00

101,000 6,060.00
111,100 3,333.00
116,150 348.45
121,200 363.60
198,371.58
29,755.74
228,127.31
Rp -
HARGA SATUAN JUMLAH
- -
15150 50,494.95
1,263 1,073.13
277,750 555.50
2,020 161.60

101,000 9,090.00
111,100 9,999.00
116,150 1,045.35
121,200 606.00
73,025.53
10,953.83
83,979.35
NG) Rp -
HARGA SATUAN JUMLAH
- -
55550 185,148.15
1,263 10,554.50
277,750 6,388.25
2,020 1,818.00

101,000 25,250.00
111,100 13,332.00
116,150 1,393.80
121,200 1,575.60
245,460.30
36,819.05
282,279.35

HARGA SATUAN JUMLAH


- -
45450 151,484.85
1,263 10,554.50
277,750 6,388.25
2,020 1,818.00

101,000 25,250.00
111,100 13,332.00
116,150 1,393.80
121,200 1,575.60
211,797.00
31,769.55
243,566.55

HARGA SATUAN JUMLAH


- -
161600 169,680.00
1,263 12,625.00
277,750 12,498.75
2,020 3,272.40

101,000 70,700.00
111,100 38,885.00
116,150 4,065.25
121,200 4,242.00
315,968.40
47,395.26
363,363.66
Rp -
HARGA SATUAN JUMLAH
- -
161600 169,680.00
1,263 12,625.00
277,750 12,498.75
2,020 3,272.40

101,000 70,700.00
111,100 38,885.00
116,150 4,065.25
121,200 4,242.00
315,968.40
47,395.26
363,363.66
Rp -
HARGA SATUAN JUMLAH
- -

- -
- -

- -
- -
- -
- -
-
-
-
Rp -
HARGA SATUAN JUMLAH
- -
- -
- -
- -

- -
- -
- -
- -
-
-
-
-
HARGA SATUAN JUMLAH
- -

- -
- -
- -

- -
- -
- -
- -
-
-
-

Rp -
HARGA SATUAN JUMLAH
- -
- -
- -
- -
- -
- -
- -

-
-
-
Rp -
HARGA SATUAN JUMLAH
- -
- -
- -
- -
- -
- -
- -

-
-
-
Rp -
HARGA SATUAN JUMLAH
- -
- -
- -
- -
- -
- -
- -
- -

-
HARGA SATUAN JUMLAH
-
-
Rp -
HARGA SATUAN JUMLAH
- -
- -
- -
- -
- -
- -

-
-
-
Rp -
HARGA SATUAN JUMLAH
- -
- -
- -
- -
- -
- -

-
-
-
Rp -
HARGA SATUAN JUMLAH
- -
- -
- -
- -
- -
- -
- -
- -

-
-
-
Rp -
HARGA SATUAN JUMLAH
- -
- -
- -
- -
- -
- -
- -

-
-
-

Rp -
HARGA SATUAN JUMLAH
- -
2525000 2,525,000.00
378,750.00 378,750.00

101,000 16,867.00
111,100 18,553.70
116,150 9,640.45
121,200 8,120.40
2,956,931.55
443,539.73
3,400,471.28

HARGA SATUAN JUMLAH


- -
1767500 1,767,500.00
265,125.00 265,125.00

101,000 15,150.00
111,100 16,665.00
116,150 8,711.25
121,200 7,272.00
2,080,423.25
312,063.49
2,392,486.74
Rp -
HARGA SATUAN JUMLAH
- -
353500 353,500.00
53,025.00 53,025.00

101,000 6,767.00
111,100 7,443.70
116,150 3,832.95
121,200 3,272.40
427,841.05
64,176.16
492,017.21

HARGA SATUAN JUMLAH


- -
1515000 1,515,000.00
303000 303,000.00
1,818,000.00
272,700.00
2,090,700.00
Rp -
HARGA SATUAN JUMLAH
- -
1262500 1,262,500.00
1262.5 7,575.00
277750 2,777.50

101,000 11,817.00
111,100 12,998.70
116,150 6,736.70
121,200 5,696.40
1,310,101.30
196,515.20
1,506,616.50
Rp -
HARGA SATUAN JUMLAH
- -
252500 252,500.00
37,875.00 37,875.00

101,000 5,050.00
111,100 5,555.00
116,150 2,903.75
121,200 2,424.00
306,307.75
45,946.16
352,253.91

HARGA SATUAN JUMLAH


- -
757500 757,500.00
113,625.00 113,625.00

101,000 18,483.00
111,100 20,331.30
116,150 10,685.80
121,200 8,847.60
929,472.70
139,420.91
1,068,893.61
Rp -
HARGA SATUAN JUMLAH
- -
252500 252,500.00
37,875.00 37,875.00

101,000 5,050.00
111,100 2,777.50
116,150 3,832.95
121,200 2,787.60
304,823.05
45,723.46
350,546.51
Rp -
HARGA SATUAN JUMLAH
- -
75750 75,750.00
11,362.50 11,362.50

101,000 1,717.00
111,100 888.80
116,150 1,277.65
121,200 969.60
91,965.55
13,794.83
105,760.38
Rp -
HARGA SATUAN JUMLAH
- -
126250 126,250.00
18,937.50 18,937.50

101,000 1,717.00
111,100 888.80
116,150 1,277.65
121,200 969.60
150,040.55
22,506.08
172,546.63

HARGA SATUAN JUMLAH


- -
454500 454,500.00
68,175.00 68,175.00

101,000 3,333.00
111,100 1,888.70
116,150 2,555.30
121,200 1,818.00
532,270.00
79,840.50
612,110.50

HARGA SATUAN JUMLAH


- -
262600 262,600.00
39,390.00 39,390.00

101,000 4,242.00
111,100 2,333.10
116,150 3,252.20
121,200 2,302.80
314,120.10
47,118.02
361,238.12
Rp -
HARGA SATUAN JUMLAH
- -
75750 75,750.00
11,362.50 11,362.50

101,000 1,717.00
111,100 888.80
116,150 1,277.65
121,200 969.60
91,965.55
13,794.83
105,760.38
Rp -
HARGA SATUAN JUMLAH
- -
1262500 1,262,500.00
189,375.00 189,375.00

101,000 12,625.00
111,100 6,999.30
116,150 9,640.45
121,200 7,029.60
1,488,169.35
223,225.40
1,711,394.75
Rp -
HARGA SATUAN JUMLAH
- -
808000 808,000.00
121,200.00 121,200.00

101,000 8,383.00
111,100 4,666.20
116,150 6,504.40
121,200 4,605.60
953,359.20
143,003.88
1,096,363.08

HARGA SATUAN JUMLAH


- -
454500 454,500.00
68,175.00 68,175.00

101,000 8,080.00
111,100 4,444.00
116,150 6,155.95
121,200 4,484.40
545,839.35
81,875.90
627,715.25
Rp -
HARGA SATUAN JUMLAH
- -
606000 606,000.00
60,600.00 60,600.00
-
101000 1,717.00
111100 888.80
116150 1,277.65
121200 969.60
671,453.05
100,717.96
772,171.01

HARGA SATUAN JUMLAH


- -
404000 404,000.00
1262.5 7,575.00
277750 2,777.50

101000 101,000.00
111100 166,650.00
116150 174,225.00
121200 19,392.00
875,619.50
131,342.93
1,006,962.43

HARGA SATUAN JUMLAH


- -
1515000 1,515,000.00
151,500.00 151,500.00
-
101000 8,383.00
111100 4,666.20
116150 6,504.40
121200 4,605.60
1,690,659.20
253,598.88
1,944,258.08

Rp -
HARGA SATUAN JUMLAH
- -
20200 2,020.00
60600 12,120.00
40400 10,100.00
16160 808.00
12120 2,424.00

101000 4,040.00
111100 13,887.50
116150 1,509.95
121200 242.40
33,011.85
4,951.78
37,963.63

HARGA SATUAN JUMLAH


- -
20200 4,040.00
60600 3,030.00
65650 26,260.00
16160 808.00
12120 2,424.00

101000 4,040.00
111100 13,887.50
116150 1,509.95
121200 242.40
49,171.85
7,375.78
56,547.63
Rp -
HARGA SATUAN JUMLAH
- -
60600 3,030.00
60600 24,240.00
16160 808.00
12120 2,424.00

101000 4,040.00
111100 13,887.50
116150 1,509.95
121200 242.40
47,151.85
7,072.78
54,224.63

Rp -
HARGA SATUAN JUMLAH
- -
1262.5 315.63
303000 13,938.00

101000 22,220.00
111100 1,222.10
116150 4,181.40
121200 2,181.60

5050 5,050.00
49,108.73
7,366.31
56,475.03
Rp -
HARGA SATUAN JUMLAH
- -

- -
- -
- -
-
- -
- -
- -
- -
-
-
-

Rp -
HARGA SATUAN JUMLAH
- -

- -
- -
- -

- -

- -
- -
- -
-
-
-
Rp -
HARGA SATUAN JUMLAH
- -
80800 28,037.60
10000 9,900.00
5000 2,950.00
2500 2,475.00
5000 5,950.00
8500 17,000.00
18000 46,800.00
22000 4,400.00
505 6,060.00
5050 5,050.00
3030 1,515.00
505 1,010.00

101000 10,100.00
116150 580.75
121200 606.00
142,434.35
21,365.15
163,799.50
Rp -
HARGA SATUAN JUMLAH
- -

- -
-
-
-
Rp -
HARGA SATUAN JUMLAH
450000 450,000.00
250000 500,000.00
220000 440,000.00
225000 225,000.00
325000 325,000.00

101000 10,100.00
111100 11,110.00
116150 1,161.50
121200 1,212.00
1,963,583.50
294,537.53
2,258,121.03
Rp -
HARGA SATUAN JUMLAH

450000 495,000.00
250000 250,000.00
125000 125,000.00

101000 10,100.00
111100 8,888.00
116150 1,161.50
121200 1,212.00
891,361.50
133,704.23
1,025,065.73

150000 165,000.00
75000 157,500.00
100000 290,000.00
100000 100,000.00

101000 10,100.00
111100 11,110.00
116150 1,161.50
121200 1,212.00
736,083.50
110,412.53
846,496.03
Rp -
HARGA SATUAN JUMLAH
- -
151500 151,500.00
14000 14,000.00
50000 50,000.00
45000 45,000.00
260,500.00
39,075.00
299,575.00

HARGA SATUAN JUMLAH


3200000 6,400,000.00
4000000 400,000.00
6,400,000.00 640,000.00
300000 300,000.00
250000 750,000.00
650000 650,000.00
9,140,000.00
1,371,000.00
10,511,000.00

HARGA SATUAN JUMLAH


HARGA SATUAN JUMLAH
- -
- -
- -
- -
- -
- -
- -
-
-
-
Rp -
HARGA SATUAN JUMLAH
- -
- -
- -
- -
- -
- -
- -
-

-
-
-
Rp -
HARGA SATUAN JUMLAH
- -
- -
- -
- -

-
-
-
Rp -
HARGA SATUAN JUMLAH
- -

- -
- -
- -
- -
- -

- -
- -
- -
- -
-
-
-
Rp -
HARGA SATUAN JUMLAH
- -
120000 120,000.00
90597 14,948.51
30000 4,950.00
136,389.14 75,014.03
73,935.28 81,328.81
36,482.72 40,130.99

101000 9,090.00
111100 9,999.00
116150 1,045.35
121200 606.00
357,112.68
53,566.90
410,679.58

HARGA SATUAN JUMLAH


- -
450000 450,000.00
40000 208,000.00
45000 45,000.00
80000 80,000.00
783,000.00
117,450.00
900,450.00

HARGA SATUAN JUMLAH

110000 6,781,500.00
95000 2,280,000.00
656500 24,283,935.00
55000 990,000.00
20000 1,713,000.00
8000 1,370,400.00
1200000 1,200,000.00
38618835 965,470.88
39,584,305.88 1,230,655.630
5,937,645.88
45,521,951.76
Rp -
HARGA SATUAN JUMLAH

110000 3,003,000.00
95000 2,897,500.00
656500 15,618,135.00
55000 1,320,000.00
20000 1,156,000.00
8000 924,800.00
1200000 1,200,000.00
26119435 652,985.88
26,772,420.88 1,294,169.147
4,015,863.13
30,788,284.01

HARGA SATUAN JUMLAH

110000 1,815,000.00
95000 1,843,000.00
656500 8,756,397.00
55000 1,100,000.00
20000 718,000.00
8000 574,400.00
600000 600,000.00
15406797 385,169.93
15,791,966.93 1,361,580.594
2,368,795.04
18,160,761.96

HARGA SATUAN JUMLAH

110000 2,117,500.00
95000 2,318,000.00
656500 10,972,741.00
55000 1,320,000.00
20000 873,000.00
8000 698,400.00
600000 600,000.00
18899641 472,491.03
19,372,132.03 1,332,891.697
2,905,819.80
22,277,951.83

HARGA SATUAN JUMLAH


- -
450000 180,000.00
200000 2,000,000.00
45000 27,000.00
7500 7,500.00
120000 120,000.00
2,334,500.00
350,175.00
2,684,675.00

HARGA SATUAN JUMLAH


- -

- -
- -
- -
- -
- -

- -
- -
- -
- -
-
-
-
Rp -
HARGA SATUAN JUMLAH
125000 125,000.00
20000 20,000.00
35000 35,000.00
180,000.00
27,000.00
207,000.00
HARGA SATUAN
NO JENIS PEKERJAAN KOEF. STN
( Rp )

1 2 3 4 5
IV PEKERJAAN BETON
1 1 M3 Membuat Beton Mutu f'c = 7,4 Mpa (K 100)
A TENAGA
- Pekerja 1.650 Oh Rp 101,000
- Tukang Batu 0.275 Oh Rp 111,100
- Kepala Tukang 0.028 Oh Rp 116,150
- Mandor 0.083 Oh Rp 121,200
B BAHAN
- Semen Portland 247.000 Kg Rp 1,263
- Pasir Beton (Lumajang) 869.000 Kg Rp 216
- Batu Pecah Mesin 2/3 999.000 Kg Rp 154
- Air 215.000 Ltr Rp 10
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (15%)
F Harga Satuan Pekerjaan (D+E)

2 1 M3 Membuat Lantai Kerja Beton Mutu f'c = 7,4 Mpa (K 100)


A TENAGA
- Pekerja 1.200 Oh Rp 101,000
- Tukang Batu 0.200 Oh Rp 111,100
- Kepala Tukang 0.020 Oh Rp 116,150
- Mandor 0.060 Oh Rp 121,200
B BAHAN
- Semen Portland 230.000 Kg Rp 1,263
- Pasir Beton (Lumajang) 893.000 Kg Rp 216
- Batu Pecah Mesin 2/3 1027.000 Kg Rp 154
- Air 200.000 Ltr Rp 10
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (15%)
F Harga Satuan Pekerjaan (D+E)

3 1 M3 Membuat Beton Mutu f'c = 14,5 Mpa (K 175)


A TENAGA
- Pekerja 1.650 Oh Rp 101,000
- Tukang Batu 0.275 Oh Rp 111,100
- Kepala Tukang 0.028 Oh Rp 116,150
- Mandor 0.083 Oh Rp 121,200
B BAHAN
- Semen Portland 326.000 Kg Rp 1,263
- Pasir Beton (Lumajang) 760.000 Kg Rp 216
- Batu Pecah Mesin 2/3 1029.000 Kg Rp 154
- Air 215.000 Ltr Rp 10
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (15%)
F Harga Satuan Pekerjaan (D+E)
4 1 M3 Membuat Beton Mutu f'c = 19,3 Mpa (K 225)
A TENAGA
- Pekerja 1.650 Oh Rp 101,000
- Tukang Batu 0.275 Oh Rp 111,100
- Kepala Tukang 0.028 Oh Rp 116,150
- Mandor 0.083 Oh Rp 121,200
B BAHAN
- Semen Portland 371.000 Kg Rp 1,263
- Pasir Beton (Lumajang) 698.000 Kg Rp 216
- Batu Pecah Mesin 2/3 1047.000 Kg Rp 154
- Air 215.000 Ltr Rp 10
- Wiremesh 12.500 m2 Rp 95,000
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (15%)
F Harga Satuan Pekerjaan (D+E)

HARGA SATUAN
NO JENIS PEKERJAAN KOEF. STN
( Rp )

1 2 3 4 5
5 1 M3 Membuat Beton Mutu f'c = 21,7 Mpa (K 250)
A TENAGA
- Pekerja 1.650 Oh Rp 101,000
- Tukang Batu 0.275 Oh Rp 111,100
- Kepala Tukang 0.028 Oh Rp 116,150
- Mandor 0.083 Oh Rp 121,200
B BAHAN
- Semen Portland 384.000 Kg Rp 1,263
- Pasir Beton (Lumajang) 692.000 Kg Rp 216
- Batu Pecah Mesin 2/3 1039.000 Kg Rp 154
- Air 215.000 Ltr Rp 10
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (15%)
F Harga Satuan Pekerjaan (D+E)

5 1 M3 Membuat Beton Mutu f'c = 26,4 Mpa (K 300)


A TENAGA
- Pekerja 1.650 Oh Rp 101,000
- Tukang Batu 0.275 Oh Rp 111,100
- Kepala Tukang 0.028 Oh Rp 116,150
- Mandor 0.083 Oh Rp 121,200
B BAHAN
- Semen Portland 413.000 Kg Rp 1,263
- Pasir Beton (Lumajang) 681.000 Kg Rp 216
- Batu Pecah Mesin 2/3 1021.000 Kg Rp 154
- Air 215.000 Ltr Rp 10
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (15%)
F Harga Satuan Pekerjaan (D+E)
6 1 M3 Membuat Beton Mutu f'c = 31,2 Mpa (K 350)
A TENAGA
- Pekerja 2.100 Oh Rp 111,100
- Tukang Batu 0.350 Oh Rp 116,150
- Kepala Tukang 0.035 Oh Rp 121,200
- Mandor 0.105 Oh Rp -
B BAHAN
- Semen Portland 448.000 Kg Rp 1,263
- Pasir Beton (Lumajang) 667.000 Kg Rp 216
- Batu Pecah Mesin 2/3 1000.000 Kg Rp 154
- Air 215.000 Ltr Rp 10
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (15%)
F Harga Satuan Pekerjaan (D+E)

7 1 Kg Pembesian dengan besi polos atau ulir


A TENAGA
- Pekerja 0.007 Oh Rp 101,000
- Tukang Besi 0.007 Oh Rp 111,100
- Kepala Tukang 0.0007 Oh Rp 116,150
- Mandor 0.0004 Oh Rp 121,200
B BAHAN
- Besi beton (polos) 1.050 Kg Rp 10,605
- Kawat beton 0.015 Kg Rp 17,170
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (15%)
F Harga Satuan Pekerjaan (D+E)

HARGA SATUAN
NO JENIS PEKERJAAN KOEF. STN
( Rp )

1 2 3 4 5
8 1 m2 Pasang Bekisting untuk pondasi
A TENAGA
- Pekerja 0.520 Oh Rp 101,000
- Tukang Kayu 0.260 Oh Rp 111,100
- Kepala Tukang 0.026 Oh Rp 116,150
- Mandor 0.026 Oh Rp 121,200
B BAHAN
- Kayu Cetakan 0.040 M3 Rp 3,737,000
- Paku Biasa 2 ' - 5' 0.300 Kg Rp 12,000
- Minyak Bekisting 0.100 Liter Rp 4,500
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (15%)
F Harga Satuan Pekerjaan (D+E)

9 1 m2 Pasang Bekisting untuk sloof


A TENAGA
- Pekerja 0.520 Oh Rp 101,000
- Tukang Kayu 0.260 Oh Rp 111,100
- Kepala Tukang 0.026 Oh Rp 116,150
- Mandor 0.026 Oh Rp 121,200
B BAHAN
- Kayu Cetakan 0.045 M3 Rp 3,737,000
- Paku Biasa 2 ' - 5' 0.300 Kg Rp 12,000
- Minyak Bekisting 0.100 Liter Rp 4,500
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (15%)
F Harga Satuan Pekerjaan (D+E)

10 1 m2 Pasang Bekisting untuk kolom bebas


A TENAGA
- Pekerja 0.660 Oh Rp 101,000
- Tukang Kayu 0.330 Oh Rp 111,100
- Kepala Tukang 0.033 Oh Rp 116,150
- Mandor 0.033 Oh Rp 121,200
B BAHAN
- Kayu Cetakan 0.040 M3 Rp 3,737,000
- Paku Biasa 2 ' - 5' 0.400 Kg Rp 12,000
- Minyak Bekisting 0.200 Liter Rp 4,500
- Balok kayu 0.015 M3 Rp 4,040,000
- Plywood tebal 9 mm 0.350 Lbr Rp 121,200
- Dolken Kayu galam 2.000 btg Rp 20,200
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (15%)
F Harga Satuan Pekerjaan (D+E)

11 1 m2 Pasang Bekisting untuk balok


A TENAGA
- Pekerja 0.660 Oh Rp 101,000
- Tukang Kayu 0.330 Oh Rp 111,100
- Kepala Tukang 0.033 Oh Rp 116,150
- Mandor 0.033 Oh Rp 121,200
B BAHAN
- Kayu Cetakan 0.040 M3 Rp 3,737,000
- Paku Biasa 2 ' - 5' 0.400 Kg Rp 12,000
- Minyak Bekisting 0.200 Liter Rp 4,500
- Balok kayu 0.018 M3 Rp 4,040,000
- Plywood tebal 9 mm 0.350 Lbr Rp 121,200
- Dolken Kayu galam 2.000 btg Rp 20,200
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (15%)
F Harga Satuan Pekerjaan (D+E)

HARGA SATUAN
NO JENIS PEKERJAAN KOEF. STN
( Rp )

1 2 3 4 5

12 1 m2 Pasang Bekisting untuk plat lantai


A TENAGA
- Pekerja 0.660 Oh Rp 101,000
- Tukang Kayu 0.330 Oh Rp 111,100
- Kepala Tukang 0.033 Oh Rp 116,150
- Mandor 0.033 Oh Rp 121,200
B BAHAN
- Kayu Cetakan 0.040 M3 Rp 3,737,000
- Paku Biasa 2 ' - 5' 0.400 Kg Rp 12,000
- Minyak Bekisting 0.200 Liter Rp 4,500
- Balok kayu 0.015 M3 Rp 4,040,000
- Plywood tebal 9 mm 0.350 Lbr Rp 121,200
- Dolken Kayu galam 6.000 btg Rp 20,200
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (15%)
F Harga Satuan Pekerjaan (D+E)

13 1 m2 Pasang Bekisting untuk dinding


A TENAGA
- Pekerja 0.660 Oh Rp 101,000
- Tukang Kayu 0.330 Oh Rp 111,100
- Kepala Tukang 0.033 Oh Rp 116,150
- Mandor 0.033 Oh Rp 121,200
B BAHAN
- Kayu Cetakan 0.030 M3 Rp 3,737,000
- Paku Biasa 2 ' - 5' 0.400 Kg Rp 12,000
- Minyak Bekisting 0.200 Liter Rp 4,500
- Balok kayu 0.020 M3 Rp 4,040,000
- Plywood tebal 9 mm 0.350 Lbr Rp 121,200
- Dolken Kayu galam 3.000 btg Rp 20,200
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (15%)
F Harga Satuan Pekerjaan (D+E)

14 1 m2 Pasang Bekisting untuk tangga


A TENAGA
- Pekerja 0.660 Oh Rp 101,000
- Tukang Kayu 0.330 Oh Rp 111,100
- Kepala Tukang 0.033 Oh Rp 116,150
- Mandor 0.033 Oh Rp 121,200
B BAHAN
- Kayu Cetakan 0.030 M3 Rp 3,737,000
- Paku Biasa 2 ' - 5' 0.400 Kg Rp 12,000
- Minyak Bekisting 0.150 Liter Rp 4,500
- Balok kayu 0.015 M3 Rp 4,040,000
- Plywood tebal 9 mm 0.350 Lbr Rp 121,200
- Dolken Kayu galam 2.000 btg Rp 20,200
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (15%)
F Harga Satuan Pekerjaan (D+E)
14 1 m3 Membuat pondasi beton bertulang (150 kg besi + bekisting)
A TENAGA
- Pekerja 5.300 Oh Rp 101,000
- Tukang Batu 0.275 Oh Rp 111,100
- Tukang Kayu 1.300 Oh Rp 111,100
- Tukang Besi 1.050 Oh Rp 111,100
- Kepala Tukang 0.262 Oh Rp 116,150
- Mandor 0.265 Oh Rp 121,200
B BAHAN
- Kayu Cetakan 0.200 M3 Rp 3,737,000
- Paku Biasa 2 ' - 5' 1.500 Kg Rp 12,000
- Minyak Bekisting 0.400 Liter Rp 4,500
- Besi beton (polos) 157.500 Kg Rp 14,958
- Kawat beton 2.250 Kg Rp 17,170
- Semen Portland 336.000 Kg Rp 1,263
- Pasir Beton (Lumajang) 0.540 M3 Rp 303,000
- Batu Pecah Mesin 2/3 0.810 M3 Rp 277,750
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (15%)
F Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO JENIS PEKERJAAN KOEF. STN
( Rp )

1 2 3 4 5

15 1 m3 Membuat sloof Beton Bertulang (100 kg besi + bekisting)


A TENAGA
- Pekerja 5.650 Oh Rp 101,000
- Tukang Batu 0.275 Oh Rp 111,100
- Tukang Kayu 1.560 Oh Rp 111,100
- Tukang Besi 1.400 Oh Rp 111,100
- Kepala Tukang 0.323 Oh Rp 116,150
- Mandor 0.283 Oh Rp 121,200
B BAHAN
- Kayu Cetakan 0.270 M3 Rp 3,737,000
- Paku Biasa 2 ' - 5' 2.000 Kg Rp 12,000
- Minyak Bekisting 0.600 Liter Rp 4,500
- Besi beton (polos) 100.000 Kg Rp 14,958
- Kawat beton 3.000 Kg Rp 17,170
- Semen Portland 336.000 Kg Rp 1,263
- Pasir Beton (Lumajang) 0.540 M3 Rp 303,000
- Batu Pecah Mesin 2/3 0.810 M3 Rp 277,750
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (15%)
F Harga Satuan Pekerjaan (D+E)

16 1 m3 Membuat balok beton bertulang (200 kg besi + bekisting)


A TENAGA
- Pekerja 6.350 Oh Rp 101,000
- Tukang Batu 0.275 Oh Rp 111,100
- Tukang Kayu 1.650 Oh Rp 111,100
- Tukang Besi 1.400 Oh Rp 111,100
- Kepala Tukang 0.333 Oh Rp 116,150
- Mandor 0.318 Oh Rp 121,200
B BAHAN
- Kayu Cetakan 0.320 M3 Rp 3,737,000
- Paku Biasa 2 ' - 5' 3.200 Kg Rp 12,000
- Minyak Bekisting 1.600 Liter Rp 4,500
- Besi beton (polos) 210.000 Kg Rp 14,958
- Kawat beton 3.000 Kg Rp 17,170
- Semen Portland 336.000 Kg Rp 1,263
- Pasir Beton (Lumajang) 0.540 M3 Rp 303,000
- Batu Pecah Mesin 2/3 0.810 M3 Rp 277,750
- Balok kayu 0.140 M3 Rp 4,040,000
- Plywood tebal 9 mm 2.800 Lbr Rp 121,200
- Dolken Kayu galam 16.000 btg Rp 20,200
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (15%)
F Harga Satuan Pekerjaan (D+E)

17 1 m3 Membuat kolom beton bertulang (200 kg besi + bekisting)


A TENAGA
- Pekerja 5.300 Oh Rp 101,000
- Tukang Batu 0.275 Oh Rp 111,100
- Tukang Kayu 1.300 Oh Rp 111,100
- Tukang Besi 1.050 Oh Rp 111,100
- Kepala Tukang 0.265 Oh Rp 116,150
- Mandor 0.265 Oh Rp 121,200
B BAHAN
- Kayu Cetakan 0.320 M3 Rp 3,737,000
- Paku Biasa 2 ' - 5' 3.200 Kg Rp 12,000
- Minyak Bekisting 1.600 Liter Rp 4,500
- Besi beton (polos) 210.000 Kg Rp 14,958
- Kawat beton 3.000 Kg Rp 17,170
- Semen Portland 336.000 Kg Rp 1,263
- Pasir Beton (Lumajang) 0.540 M3 Rp 303,000
- Batu Pecah Mesin 2/3 0.810 M3 Rp 277,750
- Balok kayu 0.120 M3 Rp 4,040,000
- Plywood tebal 9 mm 2.800 Lbr Rp 121,200
- Dolken Kayu galam 20.000 btg Rp 20,200
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (15%)
F Harga Satuan Pekerjaan (D+E)

HARGA SATUAN
NO JENIS PEKERJAAN KOEF. STN
( Rp )

1 2 3 4 5

18 1 m3 Membuat kolom beton bertulang (300 kg besi + bekisting)


- Kayu Cetakan 0.400 M3 Rp 3,737,000
- Paku Biasa 2 ' - 5' 4.000 Kg Rp 12,000
- Minyak Bekisting 2.000 Liter Rp 4,500
- Besi beton (polos) 315.000 Kg Rp 14,958
- Kawat beton 4.500 Kg Rp 17,170
- Semen Portland 336.000 Kg Rp 1,263
- Pasir Beton (Lumajang) 0.540 M3 Rp 303,000
- Batu Pecah Mesin 2/3 0.810 M3 Rp 277,750
- Balok kayu 0.150 M3 Rp 4,040,000
- Plywood tebal 9 mm 3.500 Lbr Rp 121,200
- Dolken Kayu galam 20.000 btg Rp 20,200
- Upah Pekerjaan
~ Pekerja 7.050 Oh Rp 101,000
~ Tukang Batu 0.275 Oh Rp 111,100
~ Tukang Kayu 1.650 Oh Rp 111,100
~ Tukang Besi 2.100 Oh Rp 111,100
~ Kepala Tukang 0.403 Oh Rp 116,150
~ Mandor 0.353 Oh Rp 121,200
19 1 m3 Membuat kolom beton bertulang (150 kg besi + bekisting)
A TENAGA
- Pekerja 5.300 Oh Rp 101,000
- Tukang Batu 0.275 Oh Rp 111,100
- Tukang Kayu 1.300 Oh Rp 111,100
- Tukang Besi 1.050 Oh Rp 111,100
- Kepala Tukang 0.265 Oh Rp 116,150
- Mandor 0.265 Oh Rp 121,200
B BAHAN
- Kayu Cetakan 0.320 M3 Rp 3,737,000
- Paku Biasa 2 ' - 5' 3.200 Kg Rp 12,000
- Minyak Bekisting 1.600 Liter Rp 4,500
- Besi beton (polos) 157.500 Kg Rp 14,958
- Kawat beton 2.250 Kg Rp 17,170
- Semen Portland 336.000 Kg Rp 1,263
- Pasir Beton (Lumajang) 0.540 M3 Rp 303,000
- Batu Pecah Mesin 2/3 0.810 M3 Rp 277,750
- Balok kayu 0.120 M3 Rp 4,040,000
- Plywood tebal 9 mm 2.800 Lbr Rp 121,200
- Dolken Kayu galam 32.000 btg Rp 20,200
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (15%)
F Harga Satuan Pekerjaan (D+E)

20 1 m3 Membuat tangga beton bertulang (200 kg besi + bekisting)


A TENAGA
- Pekerja 5.600 Oh Rp 101,000
- Tukang Batu 0.350 Oh Rp 111,100
- Tukang Kayu 2.300 Oh Rp 111,100
- Tukang Besi 1.400 Oh Rp 111,100
- Kepala Tukang 0.405 Oh Rp 116,150
- Mandor 0.202 Oh Rp 121,200
B BAHAN
- Kayu Cetakan 0.250 M3 Rp 3,737,000
- Paku Biasa 2 ' - 5' 3.000 Kg Rp 12,000
- Minyak Bekisting 1.200 Liter Rp 4,500
- Besi beton (polos) 200.000 Kg Rp 14,958
- Kawat beton 3.000 Kg Rp 17,170
- Semen Portland 323.000 Kg Rp 1,263
- Pasir Beton (Lumajang) 0.520 M3 Rp 303,000
- Batu Pecah Mesin 2/3 0.780 M3 Rp 277,750
- Balok kayu 0.105 M3 Rp 4,040,000
- Plywood tebal 9 mm 2.500 Lbr Rp 121,200
- Dolken Kayu galam 14.000 btg Rp 20,200
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (15%)
F Harga Satuan Pekerjaan (D+E)

HARGA SATUAN
NO JENIS PEKERJAAN KOEF. STN
( Rp )

1 2 3 4 5
16 1 m' Membuat kolom praktis beton bertulang (12 x 12) cm
A TENAGA
- Pekerja 0.180 Oh Rp 101,000
- Tukang Batu 0.020 Oh Rp 111,100
- Tukang Kayu 0.020 Oh Rp 111,100
- Tukang Besi 0.020 Oh Rp 111,100
- Kepala Tukang 0.006 Oh Rp 116,150
- Mandor 0.009 Oh Rp 121,200
B BAHAN
- Kayu Cetakan 0.002 M3 Rp 3,737,000
- Paku Biasa 2 ' - 5' 0.010 Kg Rp 12,000
- Besi beton (polos) 3.000 Kg Rp 14,958
- Kawat beton 0.450 Kg Rp 17,170
- Semen Portland 4.000 Kg Rp 1,263
- Pasir Beton (Lumajang) 0.006 M3 Rp 303,000
- Batu Pecah Mesin 2/3 0.009 M3 Rp 277,750
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (15%)
F Harga Satuan Pekerjaan (D+E)

17 1 m' Membuat ring balok beton bertulang (10 x 15) cm


A TENAGA
- Pekerja 0.297 Oh Rp 101,000
- Tukang Batu 0.033 Oh Rp 111,100
- Tukang Kayu 0.033 Oh Rp 111,100
- Tukang Besi 0.033 Oh Rp 111,100
- Kepala Tukang 0.010 Oh Rp 116,150
- Mandor 0.015 Oh Rp 121,200
B BAHAN
- Kayu Cetakan 0.003 M3 Rp 3,737,000
- Paku Biasa 2 ' - 5' 0.020 Kg Rp 12,000
- Besi beton (polos) 3.600 Kg Rp 14,958
- Kawat beton 0.050 Kg Rp 17,170
- Semen Portland 5.500 Kg Rp 1,263
- Pasir Beton (Lumajang) 0.009 M3 Rp 303,000
- Batu Pecah Mesin 2/3 0.015 M3 Rp 277,750
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (15%)
F Harga Satuan Pekerjaan (D+E)

21 1 m3 Membuat plat beton bertulang (150 kg besi + bekisting)


- Kayu Cetakan 0.320 M3 Rp 3,737,000
- Paku Biasa 2 ' - 5' 3.200 Kg Rp 12,000
- Minyak Bekisting 1.600 Liter Rp 4,500
- Besi beton (polos) 157.500 Kg Rp 14,958
- Kawat beton 2.250 Kg Rp 17,170
- Semen Portland 336.000 Kg Rp 1,263
- Pasir Beton (Lumajang) 0.540 M3 Rp 303,000
- Batu Pecah Mesin 2/3 0.810 M3 Rp 277,750
- Balok kayu 0.120 M3 Rp 4,040,000
- Plywood tebal 9 mm 2.800 Lbr Rp 121,200
- Dolken Kayu galam 32.000 btg Rp 20,200
- Upah Pekerjaan
~ Pekerja 5.300 Oh Rp 101,000
~ Tukang Batu 0.275 Oh Rp 111,100
~ Tukang Kayu 1.300 Oh Rp 111,100
~ Tukang Besi 1.050 Oh Rp 111,100
~ Kepala Tukang 0.265 Oh Rp 116,150
~ Mandor 0.265 Oh Rp 121,200
22 1 m3 Membuat Bor Pile dia. 300 mm, p=4 m
- Beton , K 250 1.000 M3 Rp 1,158,690
- Pembesian dengan besi polos 112.446 Kg Rp 14,958
23 1 m3 Membuat Bor Pile dia. 300 mm, p=3 m
- Beton , K 250 1.000 M3 Rp 1,158,690
- Pembesian dengan besi polos 115.948 Kg Rp 14,958
24 1 m3 Membuat Bor Pile dia. 300 mm, p=2 m
- Beton , K 250 1.000 M3 Rp 1,158,690
- Pembesian dengan besi polos 151.960 Kg Rp 14,958
25 1 m3 Membuat Plat setempat 100 x 60 x 30 (K 250)
- Beton , K 250 1.000 M3 Rp 1,158,690
- Pasang Bekisting 2.667 M2 Rp 216,875
- Pembesian dengan besi polos 179.667 Kg Rp 14,958
HARGA SATUAN
NO JENIS PEKERJAAN KOEF. STN
( Rp )

1 2 3 4 5
26 1 m3 Membuat Plat setempat 80 x 60 x 30 (K 250)
- Beton , K 250 1.000 M3 Rp 1,158,690
- Pasang Bekisting 2.917 M2 Rp 216,875
- Pembesian dengan besi polos 177.699 Kg Rp 14,958
27 1 m3 Membuat Plat setempat 40 x 120 x 340 (K 250)
- Beton , K 250 1.000 M3 Rp 1,158,690
- Pasang Bekisting 2.917 M2 Rp 216,875
- Pembesian dengan besi polos 125.331 Kg Rp 14,958
28 1 m3 Membuat Plat setempat 20 x 50 x 50 (K 250)
- Beton , K 250 1.000 M3 Rp 1,158,690
- Pasang Bekisting 4.000 M2 Rp 216,875
- Pembesian dengan besi polos 266.238 Kg Rp 14,958
29 1 m3 Membuat Plat setempat 30 x 60 x 60 (K 250)
- Beton , K 250 1.000 M3 Rp 1,158,690
- Pasang Bekisting 5.000 M2 Rp 216,875
- Pembesian dengan besi polos 208.763 Kg Rp 14,958
30 1 m3 Membuat Plat setempat 30 x 100 x 100 (K 225)
- Beton , K 225 1.000 M3 Rp 2,508,353
- Pasang Bekisting 2.000 M2 Rp 216,875
- Pembesian dengan besi polos 160.034 Kg Rp 14,958
31 1 m3 Membuat Plat setempat 80 x 60 x 25 (K 225)
- Beton , K 225 1.000 M3 Rp 2,508,353
- Pasang Bekisting 2.500 M2 Rp 216,875
- Pembesian dengan besi polos 211.503 Kg Rp 14,958
32 1 m3 Membuat Plat setempat 50 x 50 x 25 (K 225)
- Beton , K 225 1.000 M3 Rp 2,508,353
- Pasang Bekisting 3.000 M2 Rp 216,875
- Pembesian dengan besi polos 158.450 Kg Rp 14,958
33 1 m3 Membuat Plat setempat 50 x 250 x 650
- Beton , K 250 1.000 M3 Rp 2,508,353
- Pasang Bekisting 1.108 M2 Rp 216,875
- Pembesian dengan besi polos 133.688 Kg Rp 14,958
33 1 m3 Membuat Sloof Beton Bertulang 15 x 20 (K 250)
- Beton , K 250 1.000 M3 Rp 1,158,690
- Pasang Bekisting 6.667 M2 Rp 238,363
- Pembesian dengan besi polos 160.772 Kg Rp 14,958
34 1 m3 Membuat Sloof Beton Bertulang 15 x 30 (K 250)
- Beton , K 250 1.000 M3 Rp 1,158,690
- Pasang Bekisting 6.667 M2 Rp 238,363
- Pembesian dengan besi polos 169.456 Kg Rp 14,958
35 1 m3 Membuat Sloof Beton Bertulang 20 x 40 (K 250)
- Beton , K 225 1.000 M3 Rp 1,158,690
- Pasang Bekisting 5.000 M2 Rp 238,363
- Pembesian dengan besi polos 121.312 Kg Rp 14,958
36 1 m3 Membuat Kolom Beton Bertulang 30 x 30 (K 250)
- Beton , K 250 1.000 M3 Rp 1,158,690
- Pasang Bekisting 6.667 M2 Rp 343,390
- Pembesian dengan besi polos 181.518 Kg Rp 14,958
37 1 m3 Membuat Kolom Beton Bertulang 25 x 35 (K 250)
- Beton , K 250 1.000 M3 Rp 1,158,690
- Pasang Bekisting 4.000 M2 Rp 343,390
- Pembesian dengan besi polos 167.165 Kg Rp 14,958
38 1 m3 Membuat Kolom Beton Bertulang 25 x 25 (K 225)
- Beton , K 225 1.000 M3 Rp 2,508,353
- Pasang Bekisting 4.000 M2 Rp 343,390
- Pembesian dengan besi polos 167.165 Kg Rp 14,958
39 1 m3 Membuat Kolom Beton Bertulang 25 x 25 (K 250)
- Beton , K 250 1.000 M3 Rp 2,508,353
- Pasang Bekisting 4.000 M2 Rp 343,390
- Pembesian dengan besi polos 121.312 Kg Rp 14,958
40 1 m3 Membuat Kolom Praktis 15 x 15 (K 225)
- Beton , K 225 1.000 M3 Rp 2,508,353
- Pasang Bekisting 4.000 M2 Rp 343,390
- Pembesian dengan besi polos 133.688 Kg Rp 14,958
41 1 m3 Membuat Ringbalk Beton Bertulang 25 x 25 (K 250)
- Beton , K 250 1.000 M3 Rp 1,158,690
- Pasang Bekisting 6.000 M2 Rp 485,157
- Pembesian dengan besi polos 145.888 Kg Rp 14,958
42 1 m3 Membuat Ringbalk Beton Bertulang 20 x 30 (K 225)
- Beton , K 225 1.000 M3 Rp 2,508,353
- Pasang Bekisting 6.667 M2 Rp 485,157
- Pembesian dengan besi polos 154.125 Kg Rp 14,958
43 1 m3 Membuat Ringbalk Beton Bertulang 12 x 15 (K 225)
- Beton , K 225 1.000 M3 Rp 2,508,353
- Pasang Bekisting 8.333 M2 Rp 485,157
- Pembesian dengan besi polos 121.312 Kg Rp 14,958
HARGA SATUAN
NO JENIS PEKERJAAN KOEF. STN
( Rp )

1 2 3 4 5
44 1 m3 Membuat Ringbalk Beton Bertulang 15 x 15 (K 225)
- Beton , K 225 1.000 M3 Rp 2,508,353
- Pasang Bekisting 6.667 M2 Rp 485,157
- Pembesian dengan besi polos 221.615 Kg Rp 14,958
45 1 m3 Membuat Ringbalk Beton Bertulang 15 x 30 (K 250)
- Beton , K 250 1.000 M3 Rp 1,158,690
- Pasang Bekisting 8.333 M2 Rp 485,157
- Pembesian dengan besi polos 197.753 Kg Rp 14,958
46 1 m3 Membuat Ringbalk Beton Bertulang 25 x 35 (K 250)
- Beton , K 250 1.000 M3 Rp 1,158,690
- Pasang Bekisting 5.429 M2 Rp 485,157
- Pembesian dengan besi polos 121.312 Kg Rp 14,958
46 1 m3 Membuat Balok Latei 15 x 15 (K 225)
- Beton , K 225 1.000 M3 Rp 2,508,353
- Pasang Bekisting 9.333 M2 Rp 485,157
- Pembesian dengan besi polos 121.312 Kg Rp 14,958
47 1 m3 Membuat Plat Lantai tebal 30 cm (K 250)
- Beton , K 250 1.000 M3 Rp 2,508,353
- Pasang Bekisting 4.333 M2 Rp 436,310
- Pembesian dengan besi polos 189.390 Kg Rp 14,958
48 1 m3 Membuat Plat Lantai tebal 12 cm (K 250)
- Beton , K 250 1.000 M3 Rp 1,158,690
- Pasang Bekisting 4.839 M2 Rp 436,310
- Pembesian dengan besi polos 152.266 Kg Rp 14,958
49 1 m3 Membuat Dinding Beton Bertulang (K 250)
- Beton , K 250 1.000 M3 Rp 1,158,690
- Pasang Bekisting 5.000 M2 Rp 436,310
- Pembesian dengan besi polos 137.191 Kg Rp 14,958
48 1 m3 Membuat Plat tutup (K 225)
- Beton , K 225 1.000 M3 Rp 2,508,353
- Pasang Bekisting 2.500 M2 Rp 109,078
- Pembesian dengan besi polos 178.689 Kg Rp 14,958
49 1 m3 Membuat Jalan beton bertulang tebal 30 cm
- Beton , K 300 1.000 M3 Rp 2,508,353
- Pasang Bekisting 1.000 M2 Rp 109,078
- Pembesian dengan besi polos 39.076 Kg Rp 14,958
50 1 m3 Membuat plat deker beton bertulang tebal > 10 cm
- Beton , K 175 1.000 M3 Rp 2,508,353
- Pembesian dengan besi polos 200.000 Kg Rp 14,958
- Pasang Bekisting 8.500 M2 Rp 109,078
51 1 m3 Membuat plat jembatan beton bertulang tebal > 10 cm
- Beton , K 175 1.000 M3 Rp 2,508,353
- Pembesian dengan besi polos 300.000 Kg Rp 109,078
- Pasang Bekisting 8.500 M2 Rp 14,958

V PEKERJAAN BESI DAN ALMUNIUM


1 1 Kg Pasang Besi Profil Cannal C dan Siku L baja
A TENAGA
- Pekerja 0.060 Oh Rp 101,000
- Tukang Las 0.060 Oh Rp 111,100
- Kepala Tukang 0.006 Oh Rp 116,150
- Mandor 0.003 Oh Rp 121,200
B BAHAN
- Besi Profil Cannal C 1.150 Kg Rp 14,140

C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (15%)
F Harga Satuan Pekerjaan (D+E)

2 1 Kg Pasang baja WF
A TENAGA
- Pekerja 0.060 Oh Rp 101,000
- Tukang Las 0.060 Oh Rp 111,100
- Kepala Tukang 0.006 Oh Rp 116,150
- Mandor 0.003 Oh Rp 121,200
B BAHAN
- Besi Profil WF 1.150 Kg Rp 14,140
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (15%)
F Harga Satuan Pekerjaan (D+E)
AHSP
JUMLAH ( Rp )
( Rp )
6 7

Rp 166,650
Rp 30,553
Rp 3,252
Rp 10,060

Rp 311,838
Rp 188,076
Rp 154,151
Rp 2,150

Rp 866,729
Rp 130,009
Rp 996,739

Rp 121,200
Rp 22,220
Rp 2,323
Rp 7,272

Rp 290,375
Rp 193,271
Rp 158,472
Rp 2,000

Rp 797,133
Rp 119,570
Rp 916,702

Rp 166,650
Rp 30,553
Rp 3,252
Rp 10,060

Rp 411,575
Rp 164,486
Rp 158,780
Rp 2,150

Rp 947,505
Rp 142,126
Rp 1,089,631
1
Rp 166,650
Rp 30,553
Rp 3,252
Rp 10,060

Rp 468,388
Rp 151,067
Rp 161,558
Rp 2,150
Rp 1,187,500

Rp 2,181,177
Rp 327,177
Rp 2,508,353

AHSP
JUMLAH ( Rp )
( Rp )
6 7

Rp 166,650
Rp 30,553
Rp 3,252
Rp 10,060

Rp 484,800
Rp 149,769
Rp 160,323
Rp 2,150

Rp 1,007,556
Rp 151,133
Rp 1,158,690

Rp 166,650
Rp 30,553
Rp 3,252
Rp 10,060

Rp 521,413
Rp 147,388
Rp 157,546
Rp 2,150

Rp 1,039,011
Rp 155,852
Rp 1,194,862
Rp 233,310
Rp 40,653
Rp 4,242
Rp -

Rp 565,600
Rp 144,358
Rp 154,306
Rp 2,150

Rp 1,144,618
Rp 171,693
Rp 1,316,311

Rp 707
Rp 778
Rp 81
Rp 48

Rp 11,135
Rp 258

Rp 13,007
Rp 1,951
Rp 14,958

AHSP
JUMLAH ( Rp )
( Rp )
6 7

Rp 52,520
Rp 28,886
Rp 3,020
Rp 3,151

Rp 149,480
Rp 3,600
Rp 450

Rp 188,587
Rp 28,288
Rp 216,875

Rp 52,520
Rp 28,886
Rp 3,020
Rp 3,151

Rp 168,165
Rp 3,600
Rp 450

Rp 207,272
Rp 31,091
Rp 238,363

Rp 66,660
Rp 36,663
Rp 3,833
Rp 4,000

Rp 149,480
Rp 4,800
Rp 900
Rp 60,600
Rp 42,420
Rp 40,400

Rp 298,600
Rp 44,790
Rp 343,390

Rp 66,660
Rp 36,663
Rp 3,833
Rp 4,000

Rp 149,480
Rp 4,800
Rp 900
Rp 72,720
Rp 42,420
Rp 40,400

Rp 421,876
Rp 63,281
Rp 485,157

AHSP
JUMLAH ( Rp )
( Rp )
6 7
Rp 66,660
Rp 36,663
Rp 3,833
Rp 4,000

Rp 149,480
Rp 4,800
Rp 900
Rp 60,600
Rp 42,420
Rp 121,200

Rp 379,400
Rp 56,910
Rp 436,310

Rp 66,660
Rp 36,663
Rp 3,833
Rp 4,000

Rp 112,110
Rp 4,800
Rp 900
Rp 80,800
Rp 42,420
Rp 60,600

Rp 301,630
Rp 45,245
Rp 346,875

Rp 66,660
Rp 36,663
Rp 3,833
Rp 4,000

Rp 112,110
Rp 4,800
Rp 675
Rp 60,600
Rp 42,420
Rp 40,400

Rp 261,005
Rp 39,151
Rp 300,156
Rp 535,300
Rp 30,553
Rp 144,430
Rp 116,655
Rp 30,431
Rp 32,118

Rp 747,400
Rp 18,000
Rp 1,800
Rp 2,355,944
Rp 38,633
Rp 424,200
Rp 163,620
Rp 224,978

Rp 4,328,761
Rp 649,314
Rp 4,978,075
AHSP
JUMLAH ( Rp )
( Rp )
6 7

Rp 570,650
Rp 30,553
Rp 173,316
Rp 155,540
Rp 37,516
Rp 34,300

Rp 1,008,990
Rp 24,000
Rp 2,700
Rp 1,495,838
Rp 51,510
Rp 424,200
Rp 163,620
Rp 224,978

Rp 3,827,060
Rp 574,059
Rp 4,401,119

Rp 641,350
Rp 30,553
Rp 183,315
Rp 155,540
Rp 38,678
Rp 38,542

Rp 1,195,840
Rp 38,400
Rp 7,200
Rp 3,141,259
Rp 51,510
Rp 424,200
Rp 163,620
Rp 224,978
Rp 565,600
Rp 339,360
Rp 323,200

Rp 6,552,386
Rp 982,858
Rp 7,535,244

Rp 535,300
Rp 30,553
Rp 144,430
Rp 116,655
Rp 30,780
Rp 32,118

Rp 1,195,840
Rp 38,400
Rp 7,200
Rp 3,141,259
Rp 51,510
Rp 424,200
Rp 163,620
Rp 224,978
Rp 484,800
Rp 339,360
Rp 404,000

Rp 6,538,065
Rp 980,710
Rp 7,518,774

AHSP
JUMLAH ( Rp )
( Rp )
7

Rp 9,836,771
Rp 1,494,800
Rp 48,000
Rp 9,000
Rp 4,711,889
Rp 77,265
Rp 424,200
Rp 163,620
Rp 224,978
Rp 606,000
Rp 424,200
Rp 404,000

Rp 712,050
Rp 30,553
Rp 183,315
Rp 233,310
Rp 46,808
Rp 42,784

Rp 535,300
Rp 30,553
Rp 144,430
Rp 116,655
Rp 30,780
Rp 32,118

Rp 1,195,840
Rp 38,400
Rp 7,200
Rp 2,355,944
Rp 38,633
Rp 424,200
Rp 163,620
Rp 224,978
Rp 484,800
Rp 339,360
Rp 646,400

Rp 5,982,272
Rp 897,341
Rp 6,879,613

Rp 565,600
Rp 38,885
Rp 255,530
Rp 155,540
Rp 47,041
Rp 24,482

Rp 934,250
Rp 36,000
Rp 5,400
Rp 2,991,676
Rp 51,510
Rp 407,788
Rp 157,560
Rp 216,645
Rp 424,200
Rp 303,000
Rp 282,800

Rp 5,882,351
Rp 882,353
Rp 6,764,704

AHSP
JUMLAH ( Rp )
( Rp )
7

Rp 18,180
Rp 2,222
Rp 2,222
Rp 2,222
Rp 697
Rp 1,091

Rp 7,474
Rp 120
Rp 44,875
Rp 7,727
Rp 5,050
Rp 1,818
Rp 2,500

Rp 96,197
Rp 14,430
Rp 110,627

Rp 29,997
Rp 3,666
Rp 3,666
Rp 3,666
Rp 1,162
Rp 1,818

Rp 11,211
Rp 240
Rp 53,850
Rp 859
Rp 6,944
Rp 2,727
Rp 4,166

Rp 123,972
Rp 18,596
Rp 142,568

Rp 6,809,210
Rp 1,195,840
Rp 38,400
Rp 7,200
Rp 2,355,944
Rp 38,633
Rp 424,200
Rp 163,620
Rp 224,978
Rp 484,800
Rp 339,360
Rp 646,400

Rp 535,300
Rp 30,553
Rp 144,430
Rp 116,655
Rp 30,780
Rp 32,118
-
Rp 1,158,690
Rp 1,682,010
Rp 2,840,700
Rp 1,158,690
Rp 1,734,394
Rp 2,893,084
Rp 1,158,690
Rp 2,273,075
Rp 3,431,765
Rp 1,158,690
Rp 578,406
Rp 2,687,527
AHSP
JUMLAH ( Rp )
( Rp )
7
Rp 4,424,623
Rp 1,158,690
Rp 632,625
Rp 2,658,089
Rp 4,449,403
Rp 1,158,690
Rp 632,625
Rp 1,874,748
Rp 3,666,063
Rp 1,158,690
Rp 867,501
Rp 3,982,489
Rp 6,008,679
Rp 1,158,690
Rp 1,084,376
Rp 3,122,756
Rp 5,365,821
Rp 2,508,353
Rp 433,750
Rp 2,393,849
Rp 5,335,953
Rp 2,508,353
Rp 542,188
Rp 3,163,742
Rp 6,214,283
Rp 2,508,353
Rp 650,625
Rp 2,370,155
Rp 5,529,134
Rp 2,508,353
Rp 240,298
Rp 1,999,756
Rp 4,748,407
Rp 1,158,690
Rp 1,589,166
Rp 2,404,888
Rp 5,152,744
Rp 1,158,690
Rp 1,589,166
Rp 2,534,787
Rp 5,282,642
Rp 1,158,690
Rp 1,191,815
Rp 1,814,631
Rp 4,165,135
Rp 1,158,690
Rp 2,289,381
Rp 2,715,215
Rp 6,163,286
Rp 1,158,690
Rp 1,373,560
Rp 2,500,517
Rp 5,032,767
Rp 2,508,353
Rp 1,373,560
Rp 2,500,517
Rp 6,382,431
Rp 2,508,353
Rp 1,373,560
Rp 1,814,631
Rp 5,696,544
Rp 2,508,353
Rp 1,373,560
Rp 1,999,756
Rp 5,881,669
Rp 1,158,690
Rp 2,910,941
Rp 2,182,248
Rp 6,251,879
Rp 2,508,353
Rp 3,234,541
Rp 2,305,460
Rp 8,048,354
Rp 2,508,353
Rp 4,042,812
Rp 1,814,631
AHSP
JUMLAH ( Rp )
( Rp )
7
Rp 8,365,796
Rp 2,508,353
Rp 3,234,541
Rp 3,315,001
Rp 9,057,895
Rp 1,158,690
Rp 4,042,812
Rp 2,958,064
Rp 8,159,566
Rp 1,158,690
Rp 2,633,917
Rp 1,814,631
Rp 5,607,237
Rp 2,508,353
Rp 4,527,969
Rp 1,814,631
Rp 8,850,953
Rp 2,508,353
Rp 1,890,531
Rp 2,832,967
Rp 7,231,852
Rp 1,158,690
Rp 2,111,304
Rp 2,277,652
Rp 5,547,646
Rp 1,158,690
Rp 2,181,550
Rp 2,052,155
Rp 5,392,395
Rp 2,508,353
Rp 272,694
Rp 2,672,898
Rp 5,453,945
Rp 2,508,353
Rp 109,078
Rp 584,514
Rp 3,201,944
Rp 2,508,353
Rp 2,991,676
Rp 927,159
Rp 6,427,188
Rp 2,508,353
Rp 32,723,250
Rp 127,146
Rp 35,358,750

Rp 6,060
Rp 6,666
Rp 697
Rp 364

Rp 16,261

Rp 30,048
Rp 4,507
Rp 34,555

Rp 6,060
Rp 6,666
Rp 697
Rp 364

Rp 16,261

Rp 30,048
Rp 4,507
Rp 34,555
DAFTAR HARGA BAHAN DAN UPAH
PEKERJAAN LANJUTAN PEMBANGUNAN GEDUNG BENGKEL TENAGA TEKNIK LISTRIK INDUSTRI

NO URAIAN HARGA SATUAN


TENAGA KERJA
1 Pekerja Rp 101,000.00
2 Tukang Batu Rp 111,100.00
3 Tukang Kayu Rp 111,100.00
4 Tukang Besi Rp 111,100.00
5 Tukang Cat Rp 111,100.00
6 Tukang Pipa Rp 111,100.00
7 Tukang Gali Rp 111,100.00
8 Tukang Las Rp 111,100.00
9 Tukang Listrik Rp 111,100.00
10 Kepala Tukang Rp 116,150.00
11 Mandor Rp 121,200.00
12 Operator alat berat Rp 151,500.00
BAHAN PASANGAN
1 Bata merah Rp 707.00
2 Batako Rp 4,545.00
3 Roster uk. 20x20 Rp 25,250.00
4 Bata ringan Rp 83,830.00
5 Batu split 2/3 Rp 277,750.00
6 Batu split 3/5 Rp 267,650.00
7 Buis beton uk. U 30 L 1.2 Rp 151,500.00
8 Buis beton uk. U 50 L 1.2 Rp 232,300.00
9 Buis beton uk. U 80 L 1.2 Rp 353,500.00
10 Buis beton uk. dia. 80 L 1.2 Rp 404,000.00
11 Semen untuk perekat bata ringan - PM 110 Rp 3,030.00
12 Semen untuk plesteran - PM 210 Rp 1,515.00
13 Semen untuk Acian - PM 310 Rp 3,030.00
14 Semen untuk Acian Beton - PM 300 Rp 3,131.00
15 Glass block 20 x 20 cm Rp 30,300.00
16 Pasir batu/sirtu Rp 121,200.00
17 Pasir beton Rp 303,000.00
18 Pasir pasang Rp 277,750.00
19 Pasir urug Rp 80,800.00
20 Semen (PC) Rp 1,262.50
21 Semen (PC) 40 kg Rp 1,262.50
22 Semen Warna Rp 2,020.00
23 waterproofing coating/terpasang Rp 55,550.00
24 Waterproofing sheet/terpasang Rp 151,500.00
25 Agregat kasar Rp 262,600.00
26 Agregrat halus Rp 272,700.00
27 Batu Belah Rp 252,500.00
BAHAN PELAPIS LANTAI
1 Batu candi/batu alam/andersite Rp 121,200.00
2 Homogenius tile uk. 60 X 60 cm (HT-3) Rp 181,800.00
3 Homogenius tile uk. 30 X 60 cm (HT-3) Rp 161,600.00
4 Homogenius tile uk. 30 X 60 cm (HT-3) Rp 161,600.00
5 Keramik tile uk. 40 X 40 cm (CT-4) Rp 55,550.00
6 Homogenius tile uk. 40 X 40 cm (HT-2) Rp 65,650.00
7 Stepnosing keramik tile uk. 5 X 30 cm Rp 20,200.00
8 Keramik uk. 30 X 30 cm Rp 45,450.00
9 Keramik uk. 30 X 30 cm Rock Tile Rp 50,500.00
10 Keramik uk. 20 X 20 cm Rp 40,400.00
11 Granit Alam Rp 656,500.00
12 Border Homogenous tile uk. 15 x 30 (cutting) Rp 55,550.00
14 Step nosing keramik uk. 5 X 30 cm Rp 15,150.00
15 Keramik uk. 30 X 30 cm Rock Tile Rp 55,550.00
BAHAN PELAPIS DINDING DAN FINISHING
1 Keramik uk. 30 X 40 cm Rp 55,550.00
2 Plint homogenius tile uk. 10 X 60 cm Rp 55,550.00
3 Plint homogenius uk. 20 X 30 cm Rp 15,150.00
4 Plint homogenius uk. 10 X 40 cm Rp 45,450.00
5 Plint keramik uk. 10 X 30 cm Rp 25,250.00
6 Border keramik uk. 5 X 20 CM Rp 70,700.00
7 Floor hardener Rp 3,636.00
8 Batu Granite Alam Rp 757,500.00
LANGIT-LANGIT DAN PARTISI
1 Akustik UK. 60 X 120 Rp 65,650.00
2 Gypsum board (UK. 120 X 240 X 0.12 CM) Rp 80,800.00
3 Gypsum board (UK. 120 X 240 X 0.09 CM) Rp 60,600.00
4 Grc (UK. 120 X 240 X 0.06 CM) Rp 90,900.00
5 List Gypsum Rp 15,150.00
6 Alkasit Rp 3,030.00
7 Kain Kasa Rp 5,050.00
BAHAN KAYU
1 Kayu kelas II (Papan) Rp 3,535,000.00
2 Kayu kelas II (Balok) Rp 4,040,000.00
3 Kayu kelas III 2 x 3 x 400 Rp 3,737,000.00
4 Kayu kelas III 2 x 20 x 400 Rp 3,030,000.00
5 Dolken Ø 8 - 10 CM (kayu cerucuk) Rp 20,200.00
6 Multiplex 9 mm Rp 121,200.00
7 Multiplex 12 mm Rp 151,500.00
BAHAN PEMBESIAN
1 Besi BJTD-39 Rp 11,110.00
2 Besi BJTP-24 Rp 10,605.00
3 Besi hollow untuk plafond Rp 7,575.00
4 Besi hollow untuk dinding patisi gypsum Rp 10,100.00
5 Seng gelombang 210x80x2mm Rp -
6 Baja WF 200 Rp 14,140.00
7 Besi siku 50x50x4 Rp 12,120.00
8 Seng BJLS 30 Rp -
9 Alumunium Composit Panel 4 mm Rp -
10 Sun Shadding HD AEROBRISE 100 Rp -
11 Sun Louvre 84 R Luxalon Rp -
12 Sun Shadding HD AEROBRISE 150 Rp -
13 Alumunium Stinger SL 4 @ 5 M Rp -
SANITASI
1 Monoblock Rp 2,525,000.00
2 Wastafel under counter Complete Set Rp 1,262,500.00
3 Wastafel Wall hung Complete Set Rp 1,515,000.00
4 Kran TX 101 LB Rp 303,000.00
5 P-Trap THX 1A - 5N Rp 202,000.00
6 Stop Valve TL 511 CIN (X2) Rp 126,250.00
7 Brackets & Screws TL 516 G Rp 121,200.00
8 Kran TX 423 ST1 Rp 353,500.00
9 Kaca Cermin Rp 606,000.00
10 Urinoir U57M Rp 1,767,500.00
11 Partisi urionoir (A100) Rp 353,500.00
12 Kap lampu diaatas wastafel Rp 252,500.00
13 Tob table Granite wastafel Rp 757,500.00
14 Shower spray (TB 19 CS MCR) Rp 252,500.00
15 Tissue holder AW360J Rp 75,750.00
16 Soap dish Rp 126,250.00
17 Kran T23B13V7NB Rp 404,000.00
18 Floor drain stainless Rp 262,600.00
19 Cubical Toilet /Terpasang (L) Rp 1,515,000.00
20 Cubical Toilet /Terpasang (I) Rp 1,515,000.00
21 Soap Holder Rp 75,750.00
22 Zink Dua lubang Rp 1,262,500.00
23 Zink Satu lubang Rp 808,000.00
24 Curtain rod Rp 1,212,000.00
25 Slop Zink Rp 757,500.00
26 Kran Zink T30ARQ13N Rp 454,500.00
27 Kloset Jongkok Rp 404,000.00
BAHAN ATAP
1 Penutup atap Steel Roof 0.5 Klip-Lok Colourbond Rp -
2 Nock wuwung metal roof Rp -
3 Genteng glazur Rp -
4 Bumbungan glazur Rp -
5 Plashing parapet Rp -
6 Alumunium foil Rp -
7 Glasswool Rp -
8 Rangka atap void (pipa 4 " gv)/terpasang Rp -
9 Penutup atap void (safety glass) 12 mm/terpasang Rp -
BAHAN FINISHING
1 Cat weatheshield (EXTERIOR) Rp 65,650.00
2 Cat tembok (INTERIOR) emoltion Rp 40,400.00
3 Cat Water Base (Majestic Pearl silk) Rp 60,600.00
4 Primer Rp 30,300.00
5 Plamir Rp 20,200.00
6 Cat dusproff + thiner Rp 12,120.00
7 Meni Rp 22,220.00
8 Cat Kayu Rp 60,600.00
9 Cat Besi Rp 70,700.00
10 Kuas Cat 4" Rp 16,160.00
11 Kain Politur Rp 25,250.00
12 Dempul Rp 70,700.00
13 Minyak Cat Rp 12,120.00
14 Plamir Tembok Rp 222,200.00
PINTU DAN JENDELA
1 Solid Door uk. 35x720x220. fin. Veneer Nyatoh / melamin Rp 4,545,000.00
2 Solid Door uk. 35x820x220. fin. Veneer Nyatoh / melamin Rp 5,050,000.00
3 Solid Door uk. 35x920x220. fin. Veneer Nyatoh / melamin Rp 5,555,000.00
4 Single Fire Door 1200x2150x55 Rp 8,080,000.00
5 Double Fire Door 2000x2150x55 Rp 15,150,000.00
6 Single Steel Door 1000x2150x45 Rp 5,050,000.00
8 Kaca Stopsol 8 mm Rp 656,500.00
9 Kaca Tempered clear t. 8mm Rp -
10 Kaca Tempered clear t. 12 mm Rp -
11 Profil alumunium Mellion 50x120 (vertikal) Rp -
12 Profil alumunium Transom (horisontal) Rp -
13 Sealent Curtain Wall Rp -
14 Sealent kusen alumunium Rp -
15 Spider empat kaki Rp -
16 Routel Plat Rp -
17 Connector Rp -
18 Automatic Door
LAIN-LAIN
1 Batu Koral Sikat Rp -
2 Air Rp 10.10
2 Paku Rp 15,150.00
3 Minyak begisting Rp 10,100.00
4 Rol cat Rp -
5 Amplas Rp -
6 Thinner Rp -
7 Kawat bendrat Rp 17,170.00
8 skrup Rp 505.00
9 Paku ramset+misiu Rp 505.00
10 Main Tee untuk akustik Rp 12,120.00
11 Klem pengantung ke beton Rp 1,515.00
12 Klem pengantung ke plafond Rp 1,010.00
13 Kawat galvano Rp 2,020.00
14 Pipa BSP Ø 2" Rp -
15 Pipa BSP Ø 1" Rp -
16 Flange Ø 2" Rp -
17 Flange stainless Ø 2" Rp -
Bekisting Bondeck Rp -
Besi brc Rp -
18 peralatan bantu Rp 5,050.00
19 Besi plat strip Rp 14,140.00
Jendela Nako Rp 151,500.00
Kaca Polos Rp -
Kunci Tanam Rp -
Plywood 3,6 mm Rp -
1 Tiang pancang Ø 35 cm Rp -
2 Join Las Rp -
3 Ongkos Pancang Rp -
4 Meja rapat 1,2 x 2,4 Rp -
5 Kursi Rapat Chitose Rp -
6 Meja 1/2 biro Rp -
7 Kursi lipat Chitose Rp -
8 Kursi putar type standar Rp -
9 Ac split 0.75 PK Rp -
10 Soft board 1,2 x 2,4 Rp -
11 White board 1,2 x 2,4 Rp -
12 Filing Cabinet 4 laci Rp -
13 P3K ( lengkap ) Rp -
14 Fire extinguisher 3 kg Rp -
15 Telepon 1 line Rp -
16 Mesin faximile Rp -
17 Line listrik 3300 VA ( daya + UJL ) Rp -
18 Pulsa listrik Rp -
19 Pulsa telepon Rp -
20 Kebersihan, dll. Rp -
21 Pemeliharaan Rp -
22 Gudang Rp -
23 Los Kerja Rp -
24 Barak Pekerja Rp -
25 Sign board Proyek Rp -
26 Sign board di Pagar Rp -
27 Papan Nama ( standar ) Rp -
28 Papan Nama ( lam Rp -
29 Uitzet Rp -
30 Rp -
31 Rp -
32 Rp -
33 Titik BM Rp -
34 Biaya Penyambungan ( VA*Rp.250) Rp -
35 Biaya UJL ( VA*Rp.87) Rp -
36 Biaya Pengurusan di PLN Rp -
37 Beban malam ( 40 kwh/jam, 12 jam/hari ) Rp -
38 Beban siang ( 10 kwh/jam, 12 jam/hari Rp -
39 Biaya beban Rp -
40 Trafo ( sewa ke PLN ) Rp -
41 Kabel tiang ke Panel utama Rp -
42 Box panel Rp -
43 Kabel utama Rp -
44 Kabel bagi Rp -
45 Lampu sorot bulat Rp -
46 Lampu Mercuri 500 watt Rp Rp -
47 Lampu sorot bulat Rp -
48 Lampu Mercuri 500 watt di TC (lengan) Rp -
49 Lampu-lampu TL ( Rp -
50 Stop kontak & saklar Rp -
51 Lain-lain Rp -
52 Instalasi Air u/Lapangan Rp Rp -
53 Tangki air 2.000 ltr Rp -
54 Keran dll Rp -
55 Sumur Bor termasu Rp -
56 Drum ( 2 x 5 lt ) Rp -
57 Air PDAM utk kant Rp -
58 Kamera Digital Rp -
59 Kamera Rp -
60 Film Rp -
61 Cuci cetak film Rp -
62 Album Rp -
63 Shop Drawing uk. Rp -
64 Shop Drawing uk. A.3 Rp -
65 Pendukung (printer A2) Rp -
66 Asli Kalkir A.1 Rp -
67 Blue print A.2 Rp -
68 CD ( Electronic file ) Rp -
69 Kertas A.4 untuk Laporan Harian Rp -
70 Kertas A.4 untuk Laporan Mingguan Rp -
71 Kertas A.4 untuk Laporan Bulanan Rp -
72 Tinta Printer Rp -
73 P3K dan obat-obatan Rp -
74 Fire Extinguiser Rp -
75 Peralatan bantu Pemadam Rp -
76 Pembersihan dlm ged. ( 1 org/Lt x 3 Lt ) Rp -
77 Pembersihan luar ged. ( 2 org ) Rp -
78 Petugas car wash Rp -
79 Cleaning service Rp -
80 Cerobong Sampah Rp -
81 Bak Sampah luar ( 4 x 4 x 1.5 m ) Rp -
82 Bak Sampah di gedung Rp -
83 Sekop, gerobak dorong, sapu dll. Rp -
84 Peralatan car wash Rp -
85 Penjagaan Satpam Rp -
86 Makan Satpam Rp -
87 Peralatan Satpam ( HT, Senter, Pakaian ) Rp -
88 Biaya rutin ( batteray, dll ) Rp -
89 Mobisasi & Mobilisasi Rp -
90 Pembuatan Pintu Masuk Rp -
91 IMB Rp -
92 Mobilisasi & Demobilisasi Peralatan Tiang pancang Rp -
93 Persiapan site & handling alat Rp -
94 Cut of Pile Rp -
95 Loading test PDA Rp -
96 Kawat ayam Rp -
97 Taman Rp -
-Pekerjaan Bak Taman Rp -
-Pekerjaan Urugan Tanah Rp -
-Pekerjaan Penanaman Pohon dan Rumput Rp -
98 Aspal Rp -
99 Kerosen Rp -
Kawat las Rp -
Solar Rp -
Pelumas Rp -
Injuk Rp -
Kanstin (15 x 28 x 60) Rp -
100 Filler Rp -
Sewa Alat: Rp -
Escavator Rp -
Dump truck Rp -
Mototr grader Rp -
Vibrator Roller Rp -
Whell loader Rp -
P. tyre roller Rp -
Water tanker Rp -
Asphalt spray Rp -
Compresor Rp -
Dump truck 3-4 ton Rp -
Aspal mixing plant Rp -
Aspal finisher Rp -
Tandem roller ( 6-8) Rp -
Alat Las Rp -
Tiiang bendera Rp -
Nama Rumah Sakit Rp -
Taman Pasir Rp -
Taman Rumput dan pohon Rp -
Pekerjaan Car Stop Steel Ø4" Rp -
Logo Hurup Stainless Steel T.17.5 ( Harga percm = Rp.8500)/te Rp -
Logo (Stainless Steel) Rp -
Logo (Stainless Steel) Rp -
Paving Block K-400 T. 8 cm Rp 126,250.00
Kansteen T. 30 cm x 15 cm x 50 cm Rp 84,840.00
PERABOT TETAP
1 Kursi Mahasiswa Rp -
2 Kursi Dosen Rp -
3 Meja Dosen Rp -
4 Meja Laboratorium Rp -
5 Kursi Laboratorium Rp -
6 Loker Kunci isi 32 kunci Rp -
7 Papan Tulis Rp -
8 Kursi Tunggu isi 4 seater Rp -
LISTRIK INDUSTRI

SATUAN 1.01

per oh 100000

per oh 110000

per oh 110000

per oh 110000

per oh 110000

per oh 110000

per oh 110000

per oh 110000

per oh 110000

per oh 115000

per oh 120000

per oh 150000

per bh 700
per bh 4500
per bh 25000
per m² 83000
per m³ 275000
per m³ 265000
per bh 150000
per bh 230000
per bh 350000
per bh 400000
per kg 3000
per kg 1500
per kg 3000
per kg 3100
per bh 30000
per m³ 120000
per m³ 300000
per m³ 275000
per m³ 80000
per kg 1250
per kg 1250
per kg 2000
per m² 55000
per m² 150000
per m³ 260000
per m³ 270000
per m³ 250000

per m² 120000
per m² 180000
per m² 160000
per m² 160000
per m² 55000
per m² 65000
per bj 20000
per m² 45000
per m² 50000
per m² 40000
per m² 650000
per bj 55000
per bj 15000
per bh 55000

per m² 55000
per m 55000
per bj 15000
per bj 45000
per bj 25000
per m² 70000
per kg 3600
per m² 750000

per lbr 65000


per lbr 80000
per lbr 60000
per lbr 90000
per m 15000
per kg 3000
per m 5000

per m³ 3500000
per m³ 4000000
per m³ 3700000
per m³ 3000000
per btg 20000
per lbr 120000
per lbr 150000

per kg 11000
per kg 10500
per m 7500
per m 10000
per lbr
per kg 14000
per kg 12000
per m
per m²
per m
per m
per m
per pcs

per set 2500000


per set 1250000
per set 1500000
per set 300000
per set 200000
per set 125000
per set 120000
per BH 350000
per set 600000
per set 1750000
per set 350000
per set 250000
per m² 750000
per set 250000
per set 75000
per bh 125000
per bh 400000
per bh 260000
per unit 1500000
per unit 1500000
per bh 75000
per set 1250000
per set 800000
per set 1200000
per unit 750000
per unit 450000
per bh 400000

per m²
per m'
per bh
per bh
per m'
per m²
per m²
per m²
per m²

per ltr 65000


per ltr 40000
per ltr 60000
per ltr 30000
per Kg 20000
per Kg 12000
per kg 22000
per kg 60000
per kg 70000
per Bh 16000
per Kg 25000
per Kg 70000
per Ltr 12000
per Kg 220000

per Bh 4500000
per Bh 5000000
per Bh 5500000
per Bh 8000000
per Bh 15000000
per Bh 5000000
per m2 650000
per m2
per m2
per m
per m
per m
per m
per Bh
per Bh
per Bh
per Unit

per m²
per ltr 10
per kg 15000
per ltr 10000
per bh
per lbr
per kg
per kg 17000
per bh 500
per bh 500
per m 12000
per bh 1500
per bh 1000
per m 2000
per m
per m
per bh
per bh
per m2
per kg
per ls 5000
per kg 14000
per bh 150000
per m2
per bh
per lbr
per m
per ttk
per oh/m
per bh
per bh
per bh
per bh
per bh
per bh
per bh
per bh
per bh
per bh
per bh
per bh
per bh
per bh
per bh
per bh
per org
per x
per m2
per m2
per m2
per m2
per bh
per bh
per
per
per
per
per
per
per VA
per VA
per Ls
per kwh
per kwh
per KVA
per bh
per m
per bh
per m
per rol
per bh
per bh
per bh
per bh
per bh
per bh
per ls
per m2
per bh
per bh
per bh
per bh
per ls
per bh
per bh
per rol
per rol
per bh
lbr
per lbr
per Ls
per lbr
per lbr
per bh
per rim
per rim
per rim
per set
per ls
per bh
per ls
per org
per org
per org
per m2
per bh
per bh
per bh
per Ls
per bh
per org
per org
per Set
per ls
per ls
per bh
per m
per ls
per ls
per titi
per titk
per m
per m2
per kg
per ltr
per kg
per ltr
per ltr
per kg
per bh
per kg

per Jam
per Jam
per Jam
per Jam
per Jam
per Jam
per Jam
per Jam
per Jam
per Jam
per Jam
per Jam
per Jam
per Jam

per Hurup
per unit
per unit
per m2 125000
per bj 84000

per Unit
per Unit
per Unit
per Unit
per Unit
per Unit
per Unit
per Unit
ANALISA HARGA SATUAN PEKERJAAN
HARGA SAT.
NO. URAIAN KOEF SAT
Rp.
1 2 3 4 5
1 1 M3 PEK. GALIAN TANAH PONDASI MAX KEDALAMAN 2 M'
Pekerja 0.750 org 101000
Mandor 0.025 org 121200
Total
Profit 15%
Jumlah
2 1 M3 URUGAN PASIR URUG
Pasir Urug 1.200 m3 80800
Pekerja 0.300 org 101000
Mandor 0.010 org 121200
Total
Profit 15%
Jumlah
3 1 M3 URUGAN SIRTU DIPADATKAN
Sirtu 1.200 m3 121200
Pekerja 0.250 org 101000
Mandor 0.025 org 121200
alat bantu 1.000 lot 5050
Total
Profit 15%
Jumlah
3 MOB DEMOB ALAT BOR
loading 1.000 ls -
unloading 1.000 ls -
sewa flatbed 24.000 jam -
operator 3.000 hr -
kernet 3.000 hr -
Total
Profit 15%
Jumlah
4 1 M3 URUGAN TANAH KEMBALI DIPADATKAN
Pekerja 0.192 org -
Mandor 0.019 org -
Alat Bantu 0.100 lot -
Total
Profit 15%
Jumlah
5 1 M3 PASANGAN BATU KALI KOSONGAN (Aanstamping)
Batu Belah 1.100 m3 -
Pasir Urug 0.300 m3 -
Pekerja 0.780 org -
Tk. Batu 0.390 org -
Kepala Tukang Batu 0.039 org -
Mandor 0.039 org -
Total
Profit 15%
Jumlah
6 1 M3 PASANGAN BATU KALI 1 : 5
Batu Belah 15/20 1.200 m3 -
PC ( 50 kg ) 2.720 zak -
Pasir Pasang 0.544 m3 -
Pekerja 1.500 org -
Tk. Batu 0.750 org -
Kepala Tukang Batu 0.075 org -
Mandor 0.075 org -
Total
Profit 15%
Jumlah

7 1 M3 COR BETON READY MIX K-300


Bahan
Adukan K-300 Readymix 1.050 m3 -
alat bantu 1.000 lot -
total
Profit 15%
jumlah
Upah
Pekerja 1.650 org -
Tukang Batu 0.275 org -
Kep. Tukang Batu 0.028 org -
Mandor 0.083 org -
Total
Profit 15%
Jumlah
Bahan Upah
1 Lt.1 - -
1.09 - -
1.12 - -
1.135 - -
1.162 - -

8 1 KG PEMBESIAN DENGAN BESI ULIR U 40


Bahan
Besi Beton ulir U40 1.050 kg -
Kawat Beton 0.015 kg -
Upah
Pekerja 0.007 org -
Tukang besi 0.005 org -
Kepala Tukang Besi 0.001 org -
Mandor 0.004 org -
Total
Profit 15%
Jumlah

Bahan Upah
1- -
1.09 - -
1.12 - -
1.135 - -
1.162 - -
-
9 1 KG PEMBESIAN DENGAN BESI POLOS U24
Bahan
Besi Beton polos 1.050 kg -
Kawat Beton 0.015 kg -
Upah
Pekerja 0.007 org -
Tukang besi 0.005 org -
Kepala Tukang Besi 0.001 org -
Mandor 0.004 org -
Total
Profit 15%
Jumlah

Bahan Upah
1 Lt.1 - -
1,09 Lt.2 - -
1,12 Lt.3 - -
1,135 Lt.4 - -
1,162 Lt.5 - -
10 1 M2 PASANG BEGISTING UNTUK PONDASI POER
Kayu acuan (meranti) 0.040 m3 -
Paku biasa 2" - 5" 0.300 kg -
Minyak begisting 0.100 ltr -
total
Profit 15%

Pekerja 0.520 org -


Tukang kayu 0.260 org -
Kep. Tukang Kayu 0.026 org -
Mandor 0.026 org -
Total
Profit 15%
Jumlah
1 x Pakai Bahan Upah
1 Lt.1 - -
2 x Pakai 1 Lt.1- -
11 1 M2 PASANG BEGISTING UNTUK SLOOF
Kayu acuan (meranti) 0.045 m3 -
Paku biasa 2" - 5" 0.300 kg -
Minyak begisting 0.100 ltr -
total
Profit 15%

Pekerja 0.520 org -


Tukang kayu 0.260 org -
Kep. Tukang Kayu 0.026 org -
Mandor 0.026 org -
Total
Profit 15%
Jumlah
1 x Pakai Bahan Upah
1 Lt.1 - -
2 x Pakai 1 Lt.1- -
12 1 M2 PASANG BEGISTING UNTUK KOLOM
Bahan
Kayu acuan (meranti) 0.040 m3 -
Paku biasa 2" - 5" 0.400 kg -
Minyak begisting 0.200 ltr -
Balok kayu meranti 0.015 m3 -
Multiplek t. 9 mm 0.350 lbr -
Dolken kayu gelam 2.000 bt -
Total
Profit 15%
Jumlah
Upah
Pekerja 0.660 org -
Tukang kayu 0.330 org -
Kep. Tukang Kayu 0.033 org -
Mandor 0.033 org -
Total
Profit 15%
Jumlah

1 x Pakai Bahan Upah


1 Lt.1 - -
1,09 Lt.2 - -
1,12 Lt.3 - -
1,135 Lt.4 - -
1,162 Lt.5 - -
Bahan Upah
2 x Pakai 0,5 Lt.1- -
Lt.2 - -
Lt.3 - -
Lt.4 - -

13 - -
1 M2 PASANG BEGISTING UNTUK BALOK
Bahan
Kayu acuan (meranti) 0.040 m3 -
Paku biasa 2" - 5" 0.400 kg -
Minyak begisting 0.200 ltr -
Balok kayu meranti 0.018 m3 -
Multiplek t. 9 mm 0.350 lbr -
Dolken kayu gelam 2.000 bt -
total
Profit 15%

Upah
Pekerja 0.660 org -
Tukang kayu 0.330 org -
Kep. Tukang Kayu 0.033 org -
Mandor 0.033 org -
Total
Profit 15%
Jumlah

1 x Pakai Bahan Upah


1 Lt.1 - -
1,09 Lt.2 - -
1,12 Lt.3 - -
1,135 Lt.4 - -
1,162 Lt.5 - -

Bahan Upah
2 x Pakai 0,5 Lt.1- -
Lt.2 - -
Lt.3 - -
Lt.4 - -
Lt.5 - -
14 1 M2 PASANG BEGISTING UNTUK PLAT LANTAI
Bahan
Kayu acuan (meranti) 0.040 m3 -
Paku biasa 2" - 5" 0.400 kg -
Minyak begisting 0.200 ltr -
Balok kayu meranti 0.015 m3 -
Multiplek t. 9 mm 0.350 lbr -
Dolken kayu gelam 6.000 bt -
total
Profit 15%

Upah
Pekerja 0.660 org -
Tukang kayu 0.330 org -
Kep. Tukang Kayu 0.033 org -
Mandor 0.033 org -
Total
Profit 15%
Jumlah

1 x Pakai Bahan Upah


1 Lt.1 - -
1,09 Lt.2 - -
1,12 Lt.3 - -
1,135 Lt.4 - -
1,162 Lt.5 - -

Bahan Upah
2 x Pakai 0,5 Lt.1- -
Lt.2 - -
Lt.3 - -
Lt.4 - -
Lt.5 - -
15 1 M2 PASANG BEGISTING UNTUK TANGGA
Bahan
Kayu acuan (meranti) 0.030 m3 -
Paku biasa 2" - 5" 0.400 kg -
Minyak begisting 0.200 ltr -
Balok kayu meranti 0.020 m3 -
Multiplek t. 9 mm 0.350 lbr -
Dolken kayu gelam 3.000 bt -
total
Profit 15%

Upah
Pekerja 0.660 org -
Tukang kayu 0.330 org -
Kep. Tukang Kayu 0.033 org -
Mandor 0.033 org -
Total
Profit 15%
Jumlah

1 x Pakai Bahan Upah


1- -
1.09 - -
1.12 - -
1.135 - -
1.162 - -

Bahan Upah
2 x Pakai 0,5 - -
Lt.2 - -
Lt.3 - -
Lt.4 - -
Lt.5 - -
16 1 M3 LANTAI KERJA 1 PC : 3 PS : 5 KRL
PC ( 50 kg ) 3.165 zak -
Pasir Beton 0.638 m3 -
Koral beton 0.810 m3 -
Air 200.000 lt -

Pekerja 1.200 org -


Tukang batu 0.200 org -
Kep. Tukang Batu 0.028 org -
Mandor 0.020 org -
Total
Profit 15%
Jumlah
17 1 M2 SCREED LANTAI 1 PC : 3 PS : 5 KRL TEBAL 5 CM
PC ( 50 kg ) 0.158 zak -
Pasir Beton 0.032 m3 -
Koral beton 0.041 m3 -
Air 10.000 lt -

Pekerja 0.060 org -


Tk. Batu Setemgah Terampil 0.010 org -
Kep. Tukang Batu 0.001 org -
Mandor 0.001 org -
Total
Profit 15%
Jumlah
18 10 CM PENGELASAN DENGAN LAS LISTRIK
Upah Mandor 0.002 OH -
Tukang besi 0.020 OH -
Kepala Tukang besi 0.002 OH -
Pekerja 0.040 OH -

Bahan Kawat las listrik 0.400 kg -


Solar 0.300 ltr -
Minyak Pelumas 0.040 ltr -
Sewa Alat Welding Set (Min 5 jam) 0.170 jam -
Total
Profit 15%
Jumlah
19 1 KG FEBRIKASI DAN PEMASANGAN BAJA
Upah
Mandor 0.001 OH -
Tukang besi 0.014 OH -
Kepala Tukang besi 0.001 OH -
Pekerja 0.014 OH -

Pengelasan besi baja 2.000 cm -


Total
Profit 15%
Jumlah
20 1 KG PEKERJAAN BAJA PROFIL IWF
Bahan 1.050 Kg -
Upah Fabrikasi + pemasangan 1.000 Kg -
Total
Profit 15%
Jumlah
21 1 KG PEKERJAAN BAJA Canal C
Bahan 1.050 Kg -
Upah Fabrikasi + pemasangan 1.000 Kg -
Total
Profit 15%
Jumlah
21 1 m2 PEKERJAAN MEMASANG ATAP ZINCALUME
LYSAGHT SPANDEK 700 0,4mm BMT COLORBOND
1.000
XRWm2G550 STEEL
-
LYSAGHT CSTM FLASHING 0470 0,4mm BMT COLORBOND
0.800 m2 XRW- G550
Insulasi Atap Aluminium Foil Bubble 1.000 m2 -
Upah Pasang 1.000 ls -
Total
Profit 15%
Jumlah
22 1 M2 PENGECATAN MENI BESI ZINKCROMATE
Bahan Meni besi 0.100 kg -
Thiner A 0.100 ltr -
Sewa Alat Airless Spry 0.300 jam -

Upah Pekerja 0.300 OH -


Tukang Cat 0.300 OH -
Kepala Tukang Cat 0.030 OH -
Mandor 0.008 OH -
Total
Profit 15%
Jumlah
23 PEKERJAAN METAL ROOF AGREGAT TEBAL 40 MM
Bahan
Metal Roof / terpasang ( Agragat t = 0.4 mm ) 1.000 M² -
Insulation
alluminium foil smart Foam 4 mm 1.000 M² -
Rabung 1.000 PCS -
Screw ( berkaret) 12x14x45 8.000 M² -

Upah pasang 1.000 M² -

Total
Profit 15%
Jumlah
24 1 BH ANGKUR D22
KEBUTUHAN
Bahan
ANGKUR D 22 1.000 BH -
MUR 1.000 BH -
Upah
Pekerja 0.070 oh -
Tukang Besi 0.070 oh -
Kepala Tukang 0.007 oh -
Mandor 0.004 oh -
Total
Profit 15%
Jumlah
25 TIANG PANCANG 30 X 30
Pengadaan Bahan
Tiang Pancang 30 x 30 1.000 m1 0
Angkutan tiang pancang 1.000 m1 0

Penyambungan
Kawat las 3.768 kg 75000
Solar 2.826 ltr 12000
Minyak pelumas 0.377 ltr 10000

Pekerja 0.377 OH 101000


Tukang las 0.188 OH 111100
Kepala tukang 0.019 OH 116150
Mandor 0.002 OH 121200
Sewa alat 0.560 OH -

Pemancangan 0.150 lot -


1 TITIK TIANG PANCANG 30X30 L = 10 M
Tiang Pancang 30 x 30 10.000 m -
Satu kali sambung - tt -
Ongkos pancang 1.000 lot -
Total
Profit 15%
Jumlah
AAN
JUMLAH HARGA
Rp.
6=(3x5)

75750
3030
Rp 78,780.00
Rp 11,817.00
Rp 90,597.00

96960
30300
1212
Rp 128,472.00
Rp 19,270.80
Rp 147,742.80

145440
25250
3030
5050
Rp 178,770.00
Rp 26,815.50
Rp 205,585.50

-
-
-
-
-
Rp -
Rp -
Rp -

-
-
-
Rp -
Rp -
Rp -
-
-
-
-
-
-
Rp -
Rp -
Rp -

-
-
-
-
-
-
-
Rp -
Rp -
Rp -

-
-
-
-
-

-
-
-
-
0
0
0

-
-
-
-
-

-
-

-
-
-
-
0
0
0

-
-
-
-
-

-
-

-
-
-
-
0
0
0

-
-
-
-
-
-
-
-
-
-
-

-
-
-
-
0
0
0

-
-

-
-
-
-
-
-

-
-
-
-
0
0
0

-
-

-
-
-
-
-
-
0
0
0

-
-
-
-
0
0
0

-
-
-
-
-

-
-
-
-
-

-
-
-
-
-
-
-
-
-

-
-
-
-
0
0
0

-
-
-
-
-

-
-
-
-
-

-
-
-
-
-
-
-
-
-

-
-
-
-
0
0
0

-
-
-
-
-

-
-
-
-
-

-
-
-
-
-
-
-
-
-

-
-
-
-
0
0
0

-
-
-
-
-

-
-
-
-
-
-
-
-
-

-
-
-
-
0
0
0

-
-
-
-

-
-
-
-
0
0
0

-
-
-
-

-
-
-
-
0
0
0

-
-
-
-

-
0
0
0

-
-
0
0
0

-
-
0
0
0

-
-
-
-
0
0
0

-
-
-

-
-
-
-
0
0
0
-

-
-
-

0
0
0

-
-

-
-
-
-
0
0
0

-
-
-

-
-
-

-
-
-
-
-
-
-
-
-
-
0
0
0
ANALISA HARGA SATUAN MEKANIKAL DAN ELEKTRIKAL

NO. URAIAN SAT INDEK

1 Pekerja
- Pekerja hari 1.000
- Mandor hari 1.000
- Tukang pipa hari 1.000
- Kepala tukang pipa hari 1.000
- Tukang listrik hari 1.000
- Kepala tukang listrik hari 1.000
- Tukang AC hari 1.000
- Kepala tukang AC hari 1.000
NO. URAIAN SAT INDEK
2 Pekerjaan Panel
1 unit MDP-Kuliah, Panel Utama Gedung Kuliah
Pilot Lamp RST+Fuse bh 6.00
Ampere Meter bh 3.00
CT bh 3.00
Volt Meter bh 1.00
SSV bh 1.00
Hz Meter bh 1.00
KW Meter bh 1.00
Power Factor (Cos Q) bh 1.00
KWH Meter Analog bh 1.00
MCCB 160-400A/3P (50 kA) bh 1.00
MCCB 87-125A/3P (36 kA) bh 3.00
MCCB 70-100A/3P (36 kA) bh 4.00
Cu Bar ls 1.00
Material Bantu + Wiring ls 1.00
Box Panel bh 1.00

1 unit PL-01, Panel Pembagi Penerangan & Tenaga Lantai - 01


Pilot Lamp RST+Fuse bh 6.00
Ampere Meter bh 3.00
CT bh 3.00
Volt Meter bh 1.00
SSV bh 1.00
Hz Meter bh 1.00
KW Meter bh 1.00
Power Factor (Cos Q) bh 1.00
KWH Meter Analog bh 1.00
MCCB 175-250A/3P (50 kA) bh 1.00
MCCB 175-250A/3P (36 kA) bh 1.00
MCB 25A/3P, 6kA bh 1.00
MCB 16A/3P, 10 kA bh 4.00
Cu Bar ls 1.00
Material Bantu + Wiring ls 1.00
Box Panel bh 1.00

1 unit MDP-Konstruksi, Panel Utama Gedung Bengkel Konstruksi


Pilot Lamp RST+Fuse bh 6.00
Ampere Meter bh 3.00
CT bh 3.00
Volt Meter bh 1.00
SSV bh 1.00
Hz Meter bh 1.00
KW Meter bh 1.00
Power Factor (Cos Q) bh 1.00
KWH Meter Analog bh 1.00
MCCB 320-800A/3P (70 kA) bh 1.00
MCCB 320-800A/3P (50 kA) bh 1.00
MCB 25A/3P, 6kA bh 1.00
MCB 6A/3P, 10 kA bh 1.00
MCB 16A/3P, 10 kA bh 4.00
Cu Bar ls 1.00
Material Bantu + Wiring ls 1.00
Box Panel bh 1.00

1 unit MDP-Tenaga, Panel Utama Gedung Bengkel Tenaga


Pilot Lamp RST+Fuse bh 6.00
Ampere Meter bh 3.00
CT bh 3.00
Volt Meter bh 1.00
SSV bh 1.00
Hz Meter bh 1.00
KW Meter bh 1.00
Power Factor (Cos Q) bh 1.00
KWH Meter Analog bh 1.00
MCCB 175-250A/3P (50 kA) bh 1.00
MCCB 70-100A/3P (36 kA) bh 1.00
MCB 25A/3P, 6kA bh 1.00
MCB 6A/3P, 10 kA bh 1.00
MCB 16A/3P, 10 kA bh 4.00
Cu Bar ls 1.00
Material Bantu + Wiring ls 1.00
Box Panel bh 1.00

1 unit MDP-Alat Berat, Panel Utama Gedung Bengkel Alat Berat


Pilot Lamp RST+Fuse bh 6.00
Ampere Meter bh 3.00
CT bh 3.00
Volt Meter bh 1.00
SSV bh 1.00
Hz Meter bh 1.00
KW Meter bh 1.00
Power Factor (Cos Q) bh 1.00
KWH Meter Analog bh 1.00
MCCB 70-100A/3P (50 kA) bh 1.00
MCCB 44-63A/3P (36 kA) bh 1.00
MCB 20A/3P, 6kA bh 1.00
MCB 6A/3P, 10 kA bh 1.00
MCB 16A/3P, 10 kA bh 4.00
Cu Bar ls 1.00
Material Bantu + Wiring ls 1.00
Box Panel bh 1.00

1 unit PL-01, Panel Pembagi Penerangan & Tenaga Lantai - 01 GEDUNG KULIAH
Pilot Lamp RST+Fuse bh 3.00
Ampere Meter bh 3.00
CT bh 3.00
Volt Meter bh 1.00
SSV bh 1.00
MCCB 87-125A/3P (36 kA) bh 1.00
MCCB 70-100A/3P (36 kA) bh 1.00
MCB 63A/3P, 6kA bh 1.00
MCB 20A/3P, 6kA bh 1.00
MCB 6A/1P, 4,5kA bh 12.00
MCB 10A/1P,6kA bh 43.00
MCB 16A/1P, 6kA bh 12.00
MCB 20A/1P, 6kA bh 15.00
Shunt Trip bh 1.00
Cu Bar ls 1.00
Material Bantu + Wiring ls 1.00
Box Panel bh 1.00

1 unit PL-02, Panel Pembagi Penerangan & Tenaga Lantai - 02


Pilot Lamp RST+Fuse bh 3.00
Ampere Meter bh 3.00
CT bh 3.00
Volt Meter bh 1.00
SSV bh 1.00
MCCB 175-250A/3P (36 kA) bh 1.00
MCCB 140-200A/3P (36 kA) bh 1.00
MCB 40A/3P, 6kA bh 1.00
MCB 16A/3P, 6kA bh 1.00
MCB 6A/1P, 4,5kA bh 8.00
MCB 10A/1P,6kA bh 14.00
MCB 16A/1P, 6kA bh 1.00
MCB 25A/3P, 6kA bh 26.00
Shunt Trip bh 1.00
Cu Bar ls 1.00
Material Bantu + Wiring ls 1.00
Box Panel bh 1.00

1 unit PL-01, Panel Pembagi Penerangan & Tenaga Lantai - 01 GEDUNG BENGKEL KONSTR
Pilot Lamp RST+Fuse bh 3.00
Ampere Meter bh 3.00
CT bh 3.00
Volt Meter bh 1.00
SSV bh 1.00
MCCB 320-800A/3P (50 kA) bh 2.00
MCB 40A/3P, 6kA bh 1.00
MCB 16A/3P, 6kA bh 1.00
MCB 6A/1P, 4,5kA bh 8.00
MCB 25A/1P, 4,5kA bh 1.00
MCB 10A/1P,6kA bh 21.00
MCB 16A/1P, 6kA bh 1.00
MCB 10A/3P, 6kA bh 3.00
MCB 63A/3P, 6kA bh 41.00
Shunt Trip bh 1.00
Cu Bar ls 1.00
Material Bantu + Wiring ls 1.00
Box Panel bh 1.00
1 unit PL-01, Panel Pembagi Penerangan & Tenaga Lantai - 01 GEDU
Pilot Lamp RST+Fuse bh 3.00
Ampere Meter bh 3.00
CT bh 3.00
Volt Meter bh 1.00
SSV bh 1.00
MCCB 70-100A/3P (36 kA) bh 1.00
MCCB 44-63A/3P (36 kA) bh 1.00
MCB 50A/3P, 6kA bh 1.00
MCB 16A/3P, 6kA bh 1.00
MCB 32A/1P, 4,5kA bh 1.00
MCB 6A/1P, 4,5kA bh 8.00
MCB 10A/1P,6kA bh 11.00
MCB 16A/1P, 6kA bh 1.00
MCB 25A/3P, 6kA bh 1.00
MCB 10A/3P, 6kA bh 11.00
Shunt Trip bh 1.00
Cu Bar ls 1.00
Material Bantu + Wiring ls 1.00
Box Panel bh 1.00

1 unit PL-01, Panel Pembagi Penerangan & Tenaga Lantai - 01 GEDU


Pilot Lamp RST+Fuse bh 3.00
Ampere Meter bh 3.00
CT bh 3.00
Volt Meter bh 1.00
SSV bh 1.00
MCCB 44-63A/3P (36 kA) bh 1.00
MCCB 28-40A/3P (36 kA) bh 1.00
MCB 25A/3P, 6kA bh 1.00
MCB 10A/3P, 6kA bh 1.00
MCB 6A/1P, 4,5kA bh 8.00
MCB 10A/1P, 4,5kA bh 3.00
MCB 16A/1P, 4,5kA bh 8.00
MCB 10A/3P, 6kA bh 6.00
Shunt Trip bh 1.00
Cu Bar ls 1.00
Material Bantu + Wiring ls 1.00
Box Panel bh 1.00
1 unit PL-02, Panel Pembagi Penerangan & Tenaga Lantai - 02 GEDU
Pilot Lamp RST+Fuse bh 3.00
Ampere Meter bh 3.00
CT bh 3.00
Volt Meter bh 1.00
SSV bh 1.00
MCCB 87-125A/3P (36 kA) bh 1.00
MCCB 70-100A/3P (36 kA) bh 1.00
MCB 63A/3P, 6kA bh 1.00
MCB 20A/3P, 6kA bh 1.00
MCB 6A/1P, 4,5kA bh 12.00
MCB 10A/1P,6kA bh 33.00
MCB 16A/1P, 6kA bh 8.00
MCB 20A/1P, 6kA bh 15.00
Shunt Trip bh 1.00
Cu Bar ls 1.00
Material Bantu + Wiring ls 1.00
Box Panel bh 1.00

1 unit #REF! GEDUNG BENGKEL DASAR


Pilot Lamp RST+Fuse bh 3.00
Ampere Meter bh 3.00
CT bh 3.00
Volt Meter bh 1.00
SSV bh 1.00
MCB 25A/3P, 6kA bh 1.00
MCB 10A/3P, 6kA bh 2.00
MCB 16A/3P, 6kA bh 1.00
MCB 6A/1P, 4,5kA bh 6.00
MCB 10A/1P,6kA bh 11.00
MCB 16A/1P, 6kA bh 1.00
Shunt Trip bh 1.00
Cu Bar ls 1.00
Material Bantu + Wiring ls 1.00
Box Panel bh 1.00

1 unit PL-03, Panel Pembagi Penerangan & Tenaga Lantai - 03 GEDU


Pilot Lamp RST+Fuse bh 3.00
Ampere Meter bh 3.00
CT bh 3.00
Volt Meter bh 1.00
SSV bh 1.00
MCCB 87-125A/3P (36 kA) bh 1.00
MCCB 70-100A/3P (36 kA) bh 1.00
MCB 63A/3P, 6kA bh 1.00
MCB 20A/3P, 6kA bh 1.00
MCB 6A/1P, 4,5kA bh 12.00
MCB 10A/1P,6kA bh 39.00
MCB 16A/1P, 6kA bh 5.00
MCB 20A/1P, 6kA bh 15.00
Shunt Trip bh 1.00
Cu Bar ls 1.00
Material Bantu + Wiring ls 1.00
Box Panel bh 1.00

1 unit P.PB, Panel Pembagi Pompa Booster


Pilot Lamp RST+Fuse bh 3.00
MCB 16A/3P, 10 kA bh 1.00
MCB 6A/3P, 6kA bh 3.00
DOL set 1.00
Cu Bar ls 1.00
Material Bantu + Wiring ls 1.00
Box Panel bh 1.00

3 Instalasi Kabel Feeder Instalasi Tegangan Rendah


1 m' Kabel TR, NYY 4 x 2,5 mm² + NYA 1 x 2,5 mm²
Kabel TR, NYY 4 x 2,5 mm² m' 1.100
Kabel TR, NYA 1 x 2,5 mm² m' 1.100
Mandor Hr 0.005
Kepala Tukang listrik Hr 0.008
Tukang Hr 0.010

1 m' Kabel TR, NYY 4 x 4 mm² + NYA 1 x 2,5 mm²


Kabel TR, NYY 4 x 4 mm² m' 1.100
Kabel TR, NYA 1 x 2,5 mm² m' 1.100
Mandor Hr 0.008
Kepala Tukang listrik Hr 0.012
Tukang Hr 0.016
1 m' Kabel TR, NYY 4 x 6 mm² + NYA 1 x 2,5 mm²
Kabel TR, NYY 4 x 6 mm² m' 1.100
Kabel TR, NYA 1 x 2,5 mm² m' 1.100
Mandor Hr 0.012
Kepala Tukang listrik Hr 0.018
Tukang Hr 0.024

1 m' Kabel TR, NYY 4 x 10 mm² + BC 1 x 6 mm²


Kabel TR, NYY 4 x 10 mm² m' 1.100
Kabel BC 6 mm² m' 1.100
Mandor Hr 0.020
Kepala Tukang listrik Hr 0.030
Tukang Hr 0.040

1 m' Kabel TR, NYY 4 x 16 mm² + BC 1 x 6 mm²


Kabel TR, NYY 4 x 16 mm² m' 1.100
Kabel BC 6 mm² m' 1.100
Mandor Hr 0.032
Kepala Tukang listrik Hr 0.048
Tukang Hr 0.064

1 m' Kabel TR, NYY 4 x 25 mm² + BC 1 x 6 mm²


Kabel TR, NYY 4 x 25 mm² m' 1.100
Kabel BC 6 mm² m' 1.100
Mandor Hr 0.032
Kepala Tukang listrik Hr 0.048
Tukang Hr 0.064

1 m' Kabel TR, NYY 4 x 35 mm² + BC 1 x 10 mm²


Kabel TR, NYY 4 x 35 mm² m' 1.100
Kabel BC 10 mm² m' 1.100
Mandor Hr 0.070
Kepala Tukang listrik Hr 0.105
Tukang Hr 0.140
1 m' Kabel TR, NYY 4 x 50 mm² + BC 1 x 16 mm²
Kabel TR, NYY 4 x 50 mm² m' 1.100
Kabel BC 16 mm² m' 1.100
Mandor Hr 0.100
Kepala Tukang listrik Hr 0.150
Tukang Hr 0.200

1 m' Kabel TR, NYY 4 x 150 mm² + BC 1 x 70 mm²


Kabel TR, NYY 4 x 150 mm² m' 1.100
Kabel BC 70 mm² m' 1.100
Mandor Hr 0.300
Kepala Tukang listrik Hr 0.450
Tukang Hr 0.600

1 m' Kabel TR, NYY 3 x ( 4 x 185 mm²) + BC 1 x 70 mm²


Kabel TR, NYY 4 x 185 mm² m' 3.300
Kabel BC 70 mm² m' 1.100
Mandor Hr 0.370
Kepala Tukang listrik Hr 0.555
Tukang Hr 0.740

1 m' Kabel TR, NYFGbY 4 x 25 mm²


Kabel TR, NYFGbY 4 x 25 mm² m' 1.100
Kabel BC 10 mm² m' 1.100
Mandor Hr 0.050
Kepala Tukang listrik Hr 0.075
Tukang Hr 0.100

1 m' Kabel TR, NYFGbY 4 x 35 mm²


Kabel TR, NYFGbY 4 x 35 mm² m' 1.100
Kabel BC 16 mm² m' 1.100
Mandor Hr 0.070
Kepala Tukang listrik Hr 0.105
Tukang Hr 0.140
1 m' Kabel TR, NYFGbY 4 x 70 mm²
Kabel TR, NYFGbY 4 x 70 mm² m' 1.100
UTP Cable 4 Pairs (Cat 6) m' 1.100
Mandor Hr 0.140
Kepala Tukang listrik Hr 0.210
Tukang Hr 0.280

1 m' Kabel TR, NYFGbY 4 x 95 mm²


Kabel TR, NYFGbY 4 x 95 mm² m' 1.100
Mandor Hr 0.190
Kepala Tukang listrik Hr 0.285
Tukang Hr 0.380

4 Armature lampu :
1 bh SR - 500 - TL-C - 22W+Bat
SR - 500 - TL-C - 22W+Bat Bh 1.000
Mandor Hr 0.035
Kepala Tukang listrik Hr 0.060
Tukang Hr 0.075

1 bh DL 401 2 kaki ajust - Led 1x5 Watt + cover


DL 401 2 kaki ajust - Led 1x5 Watt + cover Bh 1.000
Mandor Hr 0.035
Kepala Tukang listrik Hr 0.060
Tukang Hr 0.075

1 bh DL 501 2 kaki ajust - Led 1x8 Watt + cover


DL 501 2 kaki ajust - Led 1x8 Watt + cover Bh 1.000
Mandor Hr 0.035
Kepala Tukang listrik Hr 0.060
Tukang Hr 0.075
1 bh DL - DLM-FS 1000lm - Led 1x13 Watt
DL - DLM-FS 1000lm - Led 1x13 Watt Bh 1.000
Mandor Hr 0.035
Kepala Tukang listrik Hr 0.060
Tukang Hr 0.075

1 bh RMI Premium - Led Tube Performance 2x22 Watt


RMI Premium - Led Tube Performance 2x22 WattBh 1.000
Mandor Hr 0.035
Kepala Tukang listrik Hr 0.060
Tukang Hr 0.075

1 bh TBIM - Led Tube Performance 2x22 Watt


TBIM - Led Tube Performance 2x22 Watt Bh 1.000
Mandor Hr 0.035
Kepala Tukang listrik Hr 0.060
Tukang Hr 0.075

1 bh TBI Pro - Led Tube Performance 2x22 Watt


TBI Pro - Led Tube Performance 2x22 Watt Bh 1.000
Mandor Hr 0.035
Kepala Tukang listrik Hr 0.060
Tukang Hr 0.075

1 bh Balk pro - Led Tube Performance 1x11 Watt


Balk pro - Led Tube Performance 1x11 Watt Bh 1.000
Mandor Hr 0.035
Kepala Tukang listrik Hr 0.060
Tukang Hr 0.075

1 bh Highbay 18 '' - HPL-N 250w


Highbay 18 '' - HPL-N 250w Bh 1.000
Mandor Hr 0.105
Kepala Tukang listrik Hr 0.180
Tukang Hr 0.225
1 bh Emergency Kit c/w Battery & Charge Min. 2 Hours Backup
Emergency Kit c/w Battery & Charge Min. 2 HoursBh
Backup 1.000
Mandor Hr 0.033
Kepala Tukang listrik Hr 0.067
Tukang Hr 0.067

5 Peralatan Instalasi :
1 bh Saklar 1 Gang 1 Way
Saklar 1 Gang 1 Way Bh 1.000
Inbow Doos Bh 1.000
Mandor Hr 0.025
Kepala Tukang listrik Hr 0.050
Tukang Hr 0.050

1 bh Saklar 2 Gang 1 Way


Saklar 2 Gang 1 Way Bh 1.000
Inbow doos plastic boks Bh 1.000
Mandor Hr 0.025
Kepala Tukang listrik Hr 0.050
Tukang Hr 0.050

1 bh Saklar 1 Gang 2 Way


Saklar 1 Gang 2 Way Bh 1.000
Inbow doos plastic boks Bh 1.000
Mandor Hr 0.025
Kepala Tukang listrik Hr 0.050
Tukang Hr 0.050

1 bh Stop Kontak Umum 1 Gang ( 2P+E ) Schuko - 250 V w/ Safety Shutter


Stop Kontak Umum 1 Gang ( 2P+E ) Schuko - 250Bh
V w/ Safety
1.000
Shutter
Inbow doos plastic boks Bh 1.000
Mandor Hr 0.025
Kepala Tukang listrik Hr 0.050
Tukang Hr 0.050
1 bh Stop Kontak Komputer (UPS) 1 Gang ( 2P+E ) Schuko - 250 V w/ Safety Shutter
Stop Kontak Komputer (UPS) 1 Gang ( 2P+E ) Schuko
Bh - 2501.000
V w/ Safety Shutter
Inbow doos plastic boks Bh 1.000
Mandor Hr 0.025
Kepala Tukang listrik Hr 0.050
Tukang Hr 0.050

1 bh Stop Kontak Medis (UPS) 1 Gang ( 2P+E ) Schuko - 250 V w/ Safety Shutter
Stop Kontak Medis (UPS) 1 Gang ( 2P+E ) SchukoBh- 250 V w/
1.000
Safety Shutter
Inbow doos plastic boks Bh 1.000
Mandor Hr 0.025
Kepala Tukang listrik Hr 0.050
Tukang Hr 0.050

1 bh Stop Kontak AC 1 Gang ( 2P+E ) 13 A - 3 Pin British Standard w/ Neon Sign


Stop Kontak AC 1 Gang ( 2P+E ) 13 A - 3 Pin British
Bh Standard
1.000
w/ Neon Sign
Inbow doos plastic boks Bh 1.000
Mandor Hr 0.025
Kepala Tukang listrik Hr 0.050
Tukang Hr 0.050

1 bh Stop Kontak Peralatan Outbow ( 2P+E ) Schuko - 250 V


Stop Kontak Peralatan Outbow ( 2P+E ) Schuko - Bh
250 V 1.000
Inbow doos plastic boks Bh 1.000
Mandor Hr 0.030
Kepala Tukang listrik Hr 0.060
Tukang Hr 0.060

1 bh Stop Kontak Peralatan Outbow ( 3P+E ) - 400 V / IP44


Stop Kontak Peralatan Outbow ( 3P+E ) - 400 V / IP44
Bh 1.000
Alat bantu & penunjang ls 1.000
Mandor Hr 0.039
Kepala Tukang listrik Hr 0.078
Tukang Hr 0.078
1 bh Telepon Outlets ( FCC Standard ) /w Surround 1 Gang - 6 Wire
Telepon Outlets ( FCC Standard ) /w Surround 1 Gang
Bh - 6 Wire
1.000
Inbow doos plastic boks Bh 1.000
Mandor Hr 0.025
Kepala Tukang listrik Hr 0.050
Tukang Hr 0.050

1 bh Outlet Data Cat6 c/w Modular Jack


Outlet Data Cat6 c/w Modular Jack Bh 1.000
Inbow doos plastic boks Bh 1.000
Mandor Hr 0.025
Kepala Tukang listrik Hr 0.050
Tukang Hr 0.050

1 bh Outlet Televisi 1 Gang 75 Ohm


Outlet Televisi 1 Gang 75 Ohm Bh 1.000
Inbow doos plastic boks Bh 1.000
Mandor Hr 0.025
Kepala Tukang listrik Hr 0.050
Tukang Hr 0.050

6 Instalasi :
1 ttk Instalasi penerangan, NYM 3 x 2,5 mm² dalam conduit PVC HI 20 mm²
Kabel TR, NYM 3 x 2,5 mm² m' 15.000
Pipa PVC High Impact 20 mm² m' 15.000
Socket Pipa bh 3.750
Tee Doos bh 2.000
Klem Pipa bh 7.500
Fhiser bh 15.000
Las Doop bh 2.000
Isolasi ban bh 0.250
Mandor hr 0.167
Kepala Tukang listrik hr 0.300
Tukang hr 0.300
1 ttk Instalasi stop kontak, NYM 3 x 2,5 mm² dalam conduit PVC HI 20 mm²
Kabel TR, NYM 3 x 2,5 mm² M' 20.000
Pipa PVC High Impact 20 mm² M' 20.000
Socket Pipa Bh 5.000
Tee Doos Bh 2.000
Klem Pipa Bh 10.000
Fhiser Bh 20.000
Las Doop Bh 2.000
Isolasi ban Bh 0.250
Mandor Hr 0.167
Kepala Tukang listrik Hr 0.300
Tukang Hr 0.300

1 ttk Instalasi stop kontak peralatan 1Ø, NYM 3 x 2,5 mm²


Kabel TR, NYM 3 x 2,5 mm² M' 25.000
Alat bantu & penunjang ls 1.000
Pipa PVC High Impact 20 mm² Hr 0.167
Socket Pipa Hr 0.300
Tee Doos Hr 0.300

1 ttk Instalasi stop kontak peralatan 3Ø, NYY 4 x 6 mm²


Kabel TR, NYY 4 x 6 mm² M' 25.000
Alat bantu & penunjang ls 1.000
Mandor Hr 0.500
Kepala Tukang listrik Hr 0.900
Tukang Hr 0.900

1 ttk Instalasi Kabel Telepon ITC 2 x 2 x 0.6 mm² dalam conduit PVC HI 20 mm²
ITC Cable 2 x 2 x 0,6 mm² m' 20.000
Pipa PVC High Impact 20 mm² m' 20.000
Socket Pipa bh 5.000
Tee Doos bh 2.000
Klem Pipa bh 10.000
Fhiser bh 20.000
Las Doop bh 2.000
Isolasi ban bh 0.250
Mandor hr 0.167
Kepala Tukang listrik hr 0.300
Tukang hr 0.300

1 m' Instalasi Kabel Telepon ITC 10 x 2 x 0.6 mm² dalam conduit PVC HI 20 mm²
ITC Cable 10 x 2 x 0,6 mm² m' 1.100
Pipa PVC High Impact 20 mm² m' 1.100
Socket Pipa bh 0.275
Klem Pipa bh 0.550
Fhiser bh 1.100
Isolasi ban bh 0.138
Mandor Hr 0.025
Kepala Tukang listrik Hr 0.050
Tukang Hr 0.050

1 m' Instalasi Kabel Telepon ITC 20 x 2 x 0.6 mm² dalam conduit PVC HI 20 mm²
ITC Cable 20 x 2 x 0,6 mm² m' 1.100
Pipa PVC High Impact 20 mm² m' 1.100
Socket Pipa bh 0.275
Klem Pipa bh 0.550
Fhiser bh 1.100
Isolasi ban bh 0.138
Mandor Hr 0.025
Kepala Tukang listrik Hr 0.050
Tukang Hr 0.050

1 m' Instalasi Kabel Data / LAN UTP Cable 4 Pairs (Cat 6) dalam conduit PVC HI 20 mm²
UTP Cable 4 Pairs (Cat 6) m' 2.100
Pipa PVC High Impact 20 mm² m' 2.100
Socket Pipa bh 0.525
Klem Pipa bh 1.050
Fhiser bh 2.100
Isolasi ban bh 0.263
Mandor hr 0.025
Kepala Tukang listrik hr 0.050
Tukang hr 0.050

1 ttk Instalasi Kabel Data / LAN UTP Cable 4 Pairs (Cat 5e) dalam conduit PVC HI 20 mm²
UTP Cable 4 Pairs (Cat 5e) m' 20.000
Pipa PVC High Impact 20 mm² m' 20.000
Socket Pipa bh 5.000
Tee Doos bh 2.000
Klem Pipa bh 10.000
Fhiser bh 20.000
Las Doop bh 2.000
Isolasi ban bh 0.250
Mandor hr 0.167
Kepala Tukang listrik hr 0.300
Tukang hr 0.300

1 ttk Instalasi Kabel MATV Coaxial RG 6 / AWG dalam conduit PVC HI 20 mm²
Coaxial RG 6 / AWG m' 20.000
Pipa PVC High Impact 20 mm² m' 20.000
Socket Pipa bh 5.000
Tee Doos bh 2.000
Klem Pipa bh 10.000
Fhiser bh 20.000
Las Doop bh 2.000
Isolasi ban bh 0.250
Mandor hr 0.167
Kepala Tukang listrik hr 0.300
Tukang hr 0.300

1 m' Instalasi Kabel feeder MATV Coaxial RG 11 / AWG dalam conduit PVC HI 20 mm²
Coaxial RG 11 / AWG m' 1.100
Pipa PVC High Impact 20 mm² m' 1.100
Socket Pipa bh 0.275
Klem Pipa bh 0.550
Fhiser bh 1.100
Isolasi ban bh 0.138
Mandor hr 0.025
Kepala Tukang listrik hr 0.050
Tukang hr 0.050

1 ttk Instalasi Fire Alarm Kabel NYM 2 x 1,5 mm² dalam conduit PVC HI 20 mm²
Kabel TR, NYM 2 x 1,5 mm² m' 15.000
Pipa PVC High Impact 20 mm² m' 15.000
Socket Pipa bh 3.750
Tee Doos bh 2.000
Klem Pipa bh 7.500
Fhiser bh 15.000
Las Doop bh 2.000
Isolasi ban bh 0.250
Mandor hr 0.167
Kepala Tukang listrik hr 0.300
Tukang hr 0.300

1 ttk Instalasi Fire Alarm Kabel STP AWG18 1P dalam conduit PVC HI 20 mm²
STP AWG18 1P m' 20.000
Pipa PVC High Impact 20 mm² m' 20.000
Socket Pipa bh 5.000
Tee Doos bh 2.000
Klem Pipa bh 10.000
Fhiser bh 20.000
Las Doop bh 2.000
Isolasi ban bh 0.250
Mandor hr 0.167
Kepala Tukang listrik hr 0.300
Tukang hr 0.300

1 m' Instalasi Looping Fire Alarm Kabel STP AWG18 1P + NYM 2 x 1,5 mm² dalam conduit P
STP AWG18 1P m' 1.100
Kabel TR, NYM 2 x 1,5 mm² m' 1.100
Pipa PVC High Impact 20 mm² m' 1.100
Socket Pipa bh 0.275
Tee Doos bh 0.110
Klem Pipa bh 0.550
Fhiser bh 1.100
Isolasi ban bh 0.250
Mandor hr 0.025
Kepala Tukang listrik hr 0.050
Tukang hr 0.050

1 ttk Instalasi Feeder NYMHy 3 x 2.5 mm² (PA, BGM, EVAC) dalam conduit PVC 20 mm²
Kabel TR, NYMHy 3 x 2.5 mm² m' 1.100
Pipa PVC High Impact 20 mm² m' 1.100
Socket Pipa bh 1.000
Tee Doos bh 0.100
Klem Pipa bh 0.150
Fhiser bh 0.300
Las Doop bh 0.100
Isolasi ban bh 0.013
Mandor hr 0.008
Kepala Tukang listrik hr 0.015
Tukang hr 0.015

1 ttk Instalasi Kabel Sound System NYMHy 2 x 1.5 mm² dalam conduit PVC 20 mm²
Kabel TR, NYMHy 2 x 1.5 mm² M' 20.000
Pipa PVC High Impact 20 mm² M' 20.000
Socket Pipa Bh 5.000
Tee Doos Bh 2.000
Klem Pipa Bh 10.000
Fhiser Bh 20.000
Las Doop Bh 2.000
Isolasi ban Bh 0.250
Mandor Hr 0.167
Kepala Tukang listrik Hr 0.300
Tukang Hr 0.300

1 ttk Instalasi Kabel Volume Control NYMHy 3 x 2.5 mm² dalam conduit PVC 20 mm²
Kabel TR, NYMHy 3 x 2.5 mm² m' 15.000
Pipa PVC High Impact 20 mm² m' 15.000
Socket Pipa bh 3.750
Tee Doos bh 2.000
Klem Pipa bh 7.500
Fhiser bh 15.000
Las Doop bh 2.000
Isolasi ban bh 0.250
Mandor hr 0.167
Kepala Tukang listrik hr 0.300
Tukang hr 0.300

1 unit DVR Standalone CADVR 2016FD 6 TB ( Incl. Harddisk)


DVR Standalone CADVR 2016FD 6 TB ( Incl. Harddisk)
unit 1
Perlengkapan unit 1
Pekerja Listrik hr 0.2
Tukang Listrik hr 0.3
Kepala Tukang Listrik hr 0.05
Mandor hr 0.018

1 unit DVR Standalone CADVR 10086FD 6 TB ( Incl. Harddisk)


DVR Standalone CADVR 10086FD 6 TB ( Incl. Harddisk)
unit 1
Perlengkapan unit 1
Pekerja Listrik hr 0.2
Tukang Listrik hr 0.3
Kepala Tukang Listrik hr 0.05
Mandor hr 0.018

1 unit Video Distribution 2 in 16 out


Video Distribution 2 in 16 out unit 1
Perlengkapan unit 1
Pekerja Listrik hr 0.2
Tukang Listrik hr 0.3
Kepala Tukang Listrik hr 0.05
Mandor hr 0.018

1 unit Monitor LCD 32" dan Inst Central Utama


Monitor LCD 32" dan Inst Central Utama unit 1
Perlengkapan unit 1
Pekerja Listrik hr 0.2
Tukang Listrik hr 0.3
Kepala Tukang Listrik hr 0.05
Mandor hr 0.018

1 unit Software dan Training


Software dan Training unit 1
Perlengkapan unit 1
Pekerja Listrik hr 0.2
Tukang Listrik hr 0.3
Kepala Tukang Listrik hr 0.05
Mandor hr 0.018
1 unit Rack Kabinet
Rack Kabinet unit 1
Perlengkapan unit 1
Pekerja Listrik hr 0.2
Tukang Listrik hr 0.3
Kepala Tukang Listrik hr 0.05
Mandor hr 0.018

1 unit Instalasi Peralatan Utama CCTV


Kabel Coaxial RG 11 Meter 40
Pipa Conduit PYV 20mm Meter 40
Fitting (Elbow, Male Bush, Joint Coupling) bh 4
Saddle bh 5
Fresher dan scrup bh 20
Junction Box bh 6
Upah Pasang ttk 1

1 ttk Instalasi CCTV Coaxial RG 11 + NYMHy 2 x 1.5 mm² dalam conduit PVC 20 mm²
Coaxial RG 11 / AWG M' 30.000
Kabel TR, NYMHy 2 x 1.5 mm² M' 30.000
Pipa PVC High Impact 20 mm² M' 30.000
Socket Pipa Bh 7.500
Tee Doos Bh 2.000
Klem Pipa Bh 15.000
Fhiser Bh 30.000
Las Doop Bh 2.000
Isolasi ban Bh 0.250
Mandor Hr 0.167
Kepala Tukang listrik Hr 0.300
Tukang Hr 0.300

1 m' Instalasi utama CCTV Coaxial RG 11 + NYMHy 2 x 1.5 mm² dalam conduit PVC 20 mm²
Coaxial RG 11 / AWG m' 1.100
Kabel TR, NYMHy 2 x 1.5 mm² m' 1.100
Pipa PVC High Impact 20 mm² m' 1.100
Socket Pipa bh 0.275
Tee Doos bh 0.110
Klem Pipa bh 0.550
Fhiser bh 1.100
Isolasi ban bh 0.250
Mandor hr 0.025
Kepala Tukang listrik hr 0.050
Tukang hr 0.050

7 Pemipaan Polypropelyne ( PPR ) Class PN.10 :


1 m' Ø 20 mm / ½"
Ø 20 mm / ½" Meter 1.100
Alat bantu & penunjang Ls 1.000
Tukang pipa Hari 0.025
Kepala tukang pipa Hari 0.013
Mandor Hari 0.005

1 m' Ø 25 mm / ¾"
Ø 25 mm / ¾" Meter 1.100
Alat bantu & penunjang Ls 1.000
Tukang pipa Hari 0.025
Kepala tukang pipa Hari 0.013
Mandor Hari 0.005

1 m' Ø 32 mm / 1"
Ø 32 mm / 1" Meter 1.100
Alat bantu & penunjang Ls 1.000
Tukang pipa Hari 0.025
Kepala tukang pipa Hari 0.013
Mandor Hari 0.005

1 m' Ø 40 mm / 1¼"
Ø 40 mm / 1¼" Meter 1.100
Alat bantu & penunjang Ls 1.000
Tukang pipa Hari 0.025
Kepala tukang pipa Hari 0.013
Mandor Hari 0.005
1 m' Ø 50 mm / 1½
Ø 50 mm / 1½ Meter 1.100
Alat bantu & penunjang Ls 1.000
Tukang pipa Hari 0.025
Kepala tukang pipa Hari 0.013
Mandor Hari 0.005

1 m' Ø 90 mm / 3"
Ø 90 mm / 3" Meter 1.100
Alat bantu & penunjang Ls 1.000
Tukang pipa Hari 0.025
Kepala tukang pipa Hari 0.013
Mandor Hari 0.005

8 Pemipaan Polypropelyne ( PPR ) Class PN.20 :


1 m' Ø 25 mm / ¾"
Ø 25 mm / ¾" Meter 1.100
Alat bantu & penunjang Ls 1.000
Tukang pipa Hari 0.025
Kepala tukang pipa Hari 0.013
Mandor Hari 0.005

1 m' Ø 32 mm / 1"
Ø 32 mm / 1" Meter 1.100
Alat bantu & penunjang Ls 1.000
Tukang pipa Hari 0.025
Kepala tukang pipa Hari 0.013
Mandor Hari 0.005

1 m' Ø 40 mm / 1¼"
Ø 40 mm / 1¼" Meter 1.100
Alat bantu & penunjang Ls 1.000
Tukang pipa Hari 0.025
Kepala tukang pipa Hari 0.013
Mandor Hari 0.005
1 m' Ø 50 mm / 1½
Ø 50 mm / 1½ Meter 1.100
Alat bantu & penunjang Ls 1.000
Tukang pipa Hari 0.025
Kepala tukang pipa Hari 0.013
Mandor Hari 0.005

9 Pemipaan PVC AW Kelas 10 kg/cm² :


1 m' Ø 32 mm / 1”
Ø 32 mm / 1” Meter 1.100
Alat bantu & penunjang Ls 1.000
Tukang pipa Hari 0.025
Kepala tukang pipa Hari 0.013
Mandor Hari 0.005

1 m' Ø 40 mm / 1¼"
Ø 40 mm / 1¼" Meter 1.100
Alat bantu & penunjang Ls 1.000
Tukang pipa Hari 0.031
Kepala tukang pipa Hari 0.016
Mandor Hari 0.006

1 m' Ø 60 mm / 2”
Ø 60 mm / 2” Meter 1.100
Alat bantu & penunjang Ls 1.000
Tukang pipa Hari 0.050
Kepala tukang pipa Hari 0.025
Mandor Hari 0.010

1 m' Ø 76 mm / 2 ½”
Ø 76 mm / 2 ½” Meter 1.100
Alat bantu & penunjang Ls 1.000
Tukang pipa Hari 0.063
Kepala tukang pipa Hari 0.031
Mandor Hari 0.013
1 m' Ø 89 mm / 3”
Ø 89 mm / 3” Meter 1.100
Alat bantu & penunjang Ls 1.000
Tukang pipa Hari 0.075
Kepala tukang pipa Hari 0.038
Mandor Hari 0.015

1 m' Ø 114 mm / 4”
Ø 114 mm / 4” Meter 1.100
Alat bantu & penunjang Ls 1.000
Tukang pipa Hari 0.100
Kepala tukang pipa Hari 0.050
Mandor Hari 0.020

1 m' Ø 140 mm / 5”
Ø 140 mm / 5” Meter 1.100
Alat bantu & penunjang Ls 1.000
Tukang pipa Hari 0.125
Kepala tukang pipa Hari 0.063
Mandor Hari 0.025

1 m' Ø 165 mm / 6”
Ø 165 mm / 6” Meter 1.100
Alat bantu & penunjang Ls 1.000
Tukang pipa Hari 0.150
Kepala tukang pipa Hari 0.075
Mandor Hari 0.030

10 Gate Valve, Bronze Body, Screwed, Class 125


1 bh Ø 25 mm / ½"
Ø 25 mm / ½" BH 1.000
Tukang pipa Hari 0.083
Kepala tukang pipa Hari 0.079
Mandor Hari 0.040
1 bh Ø 25 mm / ¾"
Ø 25 mm / ¾" BH 1.000
Tukang pipa Hari 0.083
Kepala tukang pipa Hari 0.079
Mandor Hari 0.040

1 bh Ø 32 mm / 1"
Ø 32 mm / 1" BH 1.000
Tukang pipa Hari 0.083
Kepala tukang pipa Hari 0.079
Mandor Hari 0.040

1 bh Ø 40 mm / 1¼"
Ø 40 mm / 1¼" BH 1.000
Tukang pipa Hari 0.083
Kepala tukang pipa Hari 0.079
Mandor Hari 0.040

1 bh Ø 50 mm / 1½
Ø 50 mm / 1½ BH 1.000
Tukang pipa Hari 0.083
Kepala tukang pipa Hari 0.079
Mandor Hari 0.040

1 bh Ø 50 mm / 2”
Ø 50 mm / 2” BH 1.000
Tukang pipa Hari 0.083
Kepala tukang pipa Hari 0.079
Mandor Hari 0.040

11 Pemipaan BSP Schedule 40 / ASTM A 53:


1 m' Ø 15 mm / ½”
Ø 15 mm / ½” Meter 1.100
Alat bantu & penunjang Ls 1.000
Tukang pipa Hari 0.050
Kepala tukang pipa Hari 0.050
Mandor Hari 0.025

1 m' Ø 20 mm / ¾”
Ø 20 mm / ¾” Meter 1.100
Alat bantu & penunjang Ls 1.000
Tukang pipa Hari 0.050
Kepala tukang pipa Hari 0.050
Mandor Hari 0.025

1 m' Ø 25 mm / 1”
Ø 25 mm / 1” Meter 1.100
Alat bantu & penunjang Ls 1.000
Tukang pipa Hari 0.050
Kepala tukang pipa Hari 0.050
Mandor Hari 0.025

1 m' Ø 32 mm / 1 ¼”
Ø 32 mm / 1 ¼” Meter 1.100
Alat bantu & penunjang Ls 1.000
Tukang pipa Hari 0.050
Kepala tukang pipa Hari 0.050
Mandor Hari 0.025

1 m' Ø 40mm / 1 ½”
Ø 40mm / 1 ½” Meter 1.100
Alat bantu & penunjang Ls 1.000
Tukang pipa Hari 0.050
Kepala tukang pipa Hari 0.050
Mandor Hari 0.025

1 m' Ø 50 mm / 2”
Ø 50 mm / 2” Meter 1.100
Alat bantu & penunjang Ls 1.000
Tukang pipa Hari 0.050
Kepala tukang pipa Hari 0.050
Mandor Hari 0.025

1 m' Ø 65 mm / 2 ½”
Ø 65 mm / 2 ½” Meter 1.100
Alat bantu & penunjang Ls 1.000
Tukang pipa Hari 0.050
Kepala tukang pipa Hari 0.050
Mandor Hari 0.025

1 m' Ø 80 mm / 3”
Ø 80 mm / 3” Meter 1.100
Alat bantu & penunjang Ls 1.000
Tukang pipa Hari 0.050
Kepala tukang pipa Hari 0.050
Mandor Hari 0.025

1 m' Ø 100 mm / 4”
Ø 100 mm / 4” Meter 1.100
Alat bantu & penunjang Ls 1.000
Tukang pipa Hari 0.050
Kepala tukang pipa Hari 0.050
Mandor Hari 0.025

1 m' Ø 125 mm / 5”
Ø 125 mm / 5” Meter 1.100
Alat bantu & penunjang Ls 1.000
Tukang pipa Hari 0.050
Kepala tukang pipa Hari 0.050
Mandor Hari 0.025

1 m' Ø 150 mm / 6”
Ø 150 mm / 6” Meter 1.100
Alat bantu & penunjang Ls 1.000
Tukang pipa Hari 0.050
Kepala tukang pipa Hari 0.050
Mandor Hari 0.025

12 Pemipaan HVAC ( Cu ) Type ASTM B280


1 m' Ø ¼” + Aeroflex 1/2 inch ( 13mm )
Ø ¼” + Aeroflex 1/2 inch ( 13mm ) m' 1.100
Alat bantu + Jacketing ls 1.000
Tukang pipa Hari 0.050
Kepala tukang pipa Hari 0.050
Mandor Hari 0.025

1 m' Ø ⅜” + Aeroflex 1/2 inch ( 13mm )


Ø ⅜” + Aeroflex 1/2 inch ( 13mm ) m' 1.100
Alat bantu + Jacketing ls 1.000
Tukang pipa Hari 0.075
Kepala tukang pipa Hari 0.075
Mandor Hari 0.038

1 m' Ø ½” + Aeroflex 1/2 inch ( 13mm )


Ø ½” + Aeroflex 1/2 inch ( 13mm ) m' 1.100
Alat bantu + Jacketing ls 1.000
Tukang pipa Hari 0.100
Kepala tukang pipa Hari 0.100
Mandor Hari 0.050

1 m' Ø ⅝” + Aeroflex 1/2 inch ( 13mm )


Ø ⅝” + Aeroflex 1/2 inch ( 13mm ) m' 1.100
Alat bantu + Jacketing ls 1.000
Tukang pipa Hari 0.125
Kepala tukang pipa Hari 0.125
Mandor Hari 0.063
1 m' Ø ¾” + Aeroflex 1/2 inch ( 13mm )
Ø ¾” + Aeroflex 1/2 inch ( 13mm ) m' 1.100
Alat bantu + Jacketing ls 1.000
Tukang pipa Hari 0.150
Kepala tukang pipa Hari 0.150
Mandor Hari 0.075

1 m' Ø ⅞” + Aeroflex 1/2 inch ( 13mm )


Ø ⅞” + Aeroflex 1/2 inch ( 13mm ) m' 1.100
Alat bantu + Jacketing ls 1.000
Tukang pipa Hari 0.175
Kepala tukang pipa Hari 0.175
Mandor Hari 0.088

1 m' Ø 1” + Aeroflex 1/2 inch ( 13mm )


Ø 1” + Aeroflex 1/2 inch ( 13mm ) m' 1.100
Alat bantu + Jacketing ls 1.000
Tukang pipa Hari 0.200
Kepala tukang pipa Hari 0.200
Mandor Hari 0.100

1 m' Ø 1 ⅛” + Aeroflex 1/2 inch ( 13mm )


Ø 1 ⅛” + Aeroflex 1/2 inch ( 13mm ) m' 1.100
Alat bantu + Jacketing ls 1.000
Tukang pipa Hari 0.225
Kepala tukang pipa Hari 0.225
Mandor Hari 0.113

1 m' Ø 1 ⅜” + Aeroflex 1/2 inch ( 13mm )


Ø 1 ⅜” + Aeroflex 1/2 inch ( 13mm ) m' 1.100
Alat bantu + Jacketing ls 1.000
Tukang pipa Hari 0.275
Kepala tukang pipa Hari 0.275
Mandor Hari 0.138
1 m' Ø 1 ⅝” + Aeroflex 1/2 inch ( 13mm )
Ø 1 ⅝” + Aeroflex 1/2 inch ( 13mm ) m' 1.100
Alat bantu + Jacketing ls 1.000
Tukang pipa Hari 0.325
Kepala tukang pipa Hari 0.325
Mandor Hari 0.163

13 Pekerjaan Tata Udara


Instalasi Ducting Suplay Isolasi luar dalam dengan alumunium foil double sided
1,100
dan glasswool tebal 25mm 2,200
- Sengdensity
BJLS 80 24 kg / m³ :
2,200
1 m² - Glaswool,
Seng BJLS Density
80 24 Kg/M3
2,200
- Alluminium Foil, Double Side Fire Resistance
m² m² m² m'
2,200
m² ls Hari Hari Hari
- Alumunium Tipe, lebar 2"
1,000
- Flinkote Alat bantu Tukang pipa
0,056
Kepala tukang pipa Mandor
0,210
0,280
Instalasi Ducting Suplay Isolasi luar dengan alumunium foil double sided 1,100
dan glasswool tebal 25mm 1,100
- Sengdensity
BJLS 70 24 kg / m³ :
1,100
1 m² - Glaswool,
Seng BJLS Density
70 24 Kg/M3
1,100
- Alluminium Foil, Double Side Fire Resistance
m² m² m² m'
1,100
m² ls Hari Hari Hari
- Alumunium Tipe, lebar 2"
1,000
- Flinkote Alat bantu Tukang pipa
0,056
Kepala tukang pipa Mandor
0,210
0,280
Instalasi Ducting Return Isolasi luar dengan alumunium foil double sided 1,100
dan glasswool tebal 25mm density 24 kg / m³ : 1,100
- Seng BJLS 60
1,100
1 m² - Glaswool,
Seng BJLS Density
60 24 Kg/M3
1,100
- Alluminium Foil, Double Side Fire Resistance
m² m² m² m'
1,100
m² ls Hari Hari Hari
- Alumunium Tipe, lebar 2"
1,000
- Flinkote Alat bantu Tukang pipa
0,056
Kepala tukang pipa Mandor
0,210
0,280
DAN ELEKTRIKAL

HARGA SATUAN JUMLAH

-
-
-
-
-
-
-
-
HARGA SATUAN JUMLAH

Rp 125,000 Rp 750,000
Rp 350,000 Rp 1,050,000
Rp 400,000 Rp 1,200,000
Rp 500,000 Rp 500,000
Rp 2,000,000 Rp 2,000,000
Rp 1,250,000 Rp 1,250,000
Rp 1,500,000 Rp 1,500,000
Rp 2,000,000 Rp 2,000,000
Rp 1,500,000 Rp 1,500,000
Rp 2,500,000 Rp 2,500,000
Rp 2,250,000 Rp 6,750,000
Rp 2,000,000 Rp 8,000,000
Rp 1,750,000 Rp 1,750,000
Rp 9,225,000 Rp 9,225,000
Rp 3,700,000 Rp 3,700,000
Total Rp 43,675,000
Profit 15% Rp 6,551,250
Jumlah Rp 50,226,250

Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Total Rp -
Profit 15% Rp -
Jumlah Rp -

Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Total Rp -
Profit 15% Rp -
Jumlah Rp -

Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Total Rp -
Profit 15% Rp -
Jumlah Rp -

Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Total Rp -
Profit 15% Rp -

1 GEDUNG KULIAH
Rp 125,000 Rp 375,000.00
Rp 350,000 Rp 1,050,000.00
Rp 400,000 Rp 1,200,000.00
Rp 500,000 Rp 500,000.00
Rp 2,000,000 Rp 2,000,000.00
Rp 2,250,000 Rp 2,250,000.00
Rp 2,000,000 Rp 2,000,000.00
Rp 750,000 Rp 750,000.00
Rp 700,000 Rp 700,000.00
Rp 75,000 Rp 900,000.00
Rp 85,000 Rp 3,655,000.00
Rp 125,000 Rp 1,500,000.00
Rp 150,000 Rp 2,250,000.00
Rp 500,000 Rp 500,000.00
Rp 750,000 Rp 750,000.00
Rp 5,686,500 Rp 5,686,500.00
Rp 1,700,000 Rp 1,700,000.00
Total Rp 27,766,500.00
Profit 15% Rp 4,164,975.00
Jumlah Rp 31,931,475.00
GEDUNG BENGKEL DASAR
Rp 125,000 Rp 375,000.00
Rp 350,000 Rp 1,050,000.00
Rp 400,000 Rp 1,200,000.00
Rp 500,000 Rp 500,000.00
Rp 2,000,000 Rp 2,000,000.00
Rp 2,250,000 Rp 2,250,000.00
Rp 2,000,000 Rp 2,000,000.00
Rp 750,000 Rp 750,000.00
Rp 700,000 Rp 700,000.00
Rp 75,000 Rp 600,000.00
Rp 85,000 Rp 1,190,000.00
Rp 125,000 Rp 125,000.00
Rp 150,000 Rp 3,900,000.00
Rp 500,000 Rp 500,000.00
Rp 750,000 Rp 750,000.00
Rp 4,939,500 Rp 4,939,500.00
Rp 1,700,000 Rp 1,700,000.00
Total Rp 24,529,500.00
Profit 15% Rp 3,679,425.00
Jumlah Rp 28,208,925.00
1 GEDUNG BENGKEL KONSTRUKSI
Rp 125,000 Rp 375,000.00
Rp 350,000 Rp 1,050,000.00
Rp 400,000 Rp 1,200,000.00
Rp 500,000 Rp 500,000.00
Rp 2,000,000 Rp 2,000,000.00
Rp 2,500,000 Rp 5,000,000.00
Rp 750,000 Rp 750,000.00
Rp 700,000 Rp 700,000.00
Rp 75,000 Rp 600,000.00
Rp 250,000 Rp 250,000.00
Rp 125,000 Rp 2,625,000.00
Rp 150,000 Rp 150,000.00
Rp 125,000 Rp 375,000.00
Rp 600,000 Rp 24,600,000.00
Rp 500,000 Rp 500,000.00
Rp 750,000 Rp 750,000.00
Rp 4,939,500 Rp 4,939,500.00
Rp 1,700,000 Rp 1,700,000.00
Total Rp 47,689,500.00
Profit 15% Rp 7,153,425.00
Jumlah Rp 54,842,925.00
1 GEDUNG BENGKEL TENAGA
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Total
Profit 15%
Jumlah
1 GEDUNG BENGKEL ALAT BERAT
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Total
Profit 15%
Jumlah
2 GEDUNG KULIAH
Rp
Rp
Rp
Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Total Rp -
Profit 15% Rp -
Jumlah Rp -
G BENGKEL DASAR
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Total Rp -
Profit 15% Rp -
Jumlah Rp -
3 GEDUNG KULIAH
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Total Rp -
Profit 15% Rp -
Jumlah Rp -

Rp Rp
Rp Rp
Rp Rp
Rp
Rp
Rp
Rp
Rp -
To
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -
Safety Shutter
- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -
250 V w/ Safety Shutter
- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -
V w/ Safety Shutter
- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -
ndard w/ Neon Sign
- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -
PVC HI 20 mm²
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -
duit PVC HI 20 mm²
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -
duit PVC HI 20 mm²
- -
- -
- -
- -
- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -
duit PVC HI 20 mm²
- -
- -
- -
- -
- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -
lam conduit PVC HI 20 mm²
- -
- -
- -
- -
- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -
alam conduit PVC HI 20 mm²
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -
uit PVC HI 20 mm²
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -
m conduit PVC HI 20 mm²
- -
- -
- -
- -
- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -
duit PVC HI 20 mm²
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -
uit PVC HI 20 mm²
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -
YM 2 x 1,5 mm² dalam conduit PVC HI 20 mm²
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -
dalam conduit PVC 20 mm²
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -
m conduit PVC 20 mm²
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -
am conduit PVC 20 mm²
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

Rp Rp
Rp
Rp
Rp Rp
Rp Rp
Rp Rp
Rp
PROFIT 15% Rp -
Jumlah Rp -

Rp Rp
Rp
Rp
Rp Rp
Rp Rp
Rp Rp
Rp
PROFIT 15% Rp -
Jumlah Rp -

Rp Rp
Rp
Rp
Rp Rp
Rp Rp
Rp Rp
Rp
PROFIT 15% Rp -
Jumlah Rp

Rp Rp
Rp
Rp
Rp Rp
Rp Rp
Rp Rp
Rp
PROFIT 15% Rp -
Jumlah Rp

Rp Rp
Rp
Rp
Rp Rp
Rp Rp
Rp Rp
Rp
PROFIT 15% Rp -
Jumlah Rp

Rp Rp
Rp
Rp
Rp Rp
Rp Rp
Rp Rp
Rp
PROFIT 15% Rp -
Jumlah Rp

- Rp
- Rp
- Rp
- Rp
Total Rp
Rp
Rp
Rp
PROFIT 15% Rp -
Jumlah Rp -
am conduit PVC 20 mm²
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp -
Profit 15% Rp -
Jumlah Rp -
mm² dalam conduit PVC 20 mm²
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -
- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -
- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -
- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -
- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -
- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -
- -
- -
- -
- -
- -
Total Rp -
Profit 15% Rp -
Jumlah Rp -

- -
- -
- -
- -
- -
-Total -Rp -
- -
Profit
- 15% Rp
- -
-
Jumlah -
Rp -
- -
- -
- -
- -
- -
-
Total -
Rp -
- -
Profit
- 15% Rp
- -
-
Jumlah -
Rp -
- -
- -
- -
- -
- -
-Total -Rp -
- -
Profit
- 15% Rp
- -
-Jumlah -Rp -
HARGA
INDEK
SATUAN
HARGA
JUMLAH TOTAL NO. URAIAN SAT INDEK JUMLAH TOTAL
SATUAN
HARGA
NO. URAIAN SAT INDEK JUMLAH TOTAL NO. URAIAN
SATUAN
HARGA
SAT INDEK JUMLAH TOTAL NO. URAIAN SAT
SATUAN
HARGA HARGA
INDEK JUMLAH TOTAL NO. URAIAN SAT INDEK
SATUAN SATUAN
HARGA
JUMLAH TOTAL NO. URAIAN SAT INDEK JUMLAH TOTAL
SATUAN
HARGA
NO. URAIAN SAT INDEK JUMLAH TOTAL NO. URAIAN
SATUAN
HARGA
SAT INDEK JUMLAH TOTAL NO. URAIAN SAT
SATUAN
HARGA HARGA
INDEK JUMLAH TOTAL NO. URAIAN SAT INDEK
SATUAN SATUAN
HARGA
JUMLAH TOTAL NO. URAIAN SAT INDEK JUMLAH TOTAL
SATUAN
HARGA
NO. URAIAN SAT INDEK JUMLAH TOTAL NO. URAIAN
SATUAN
HARGA
SAT INDEK JUMLAH TOTAL NO. URAIAN SAT
SATUAN
HARGA HARGA
INDEK JUMLAH TOTAL NO. URAIAN SAT INDEK
SATUAN SATUAN
HARGA
JUMLAH TOTAL NO. URAIAN SAT INDEK JUMLAH TOTAL
SATUAN
HARGA
NO. URAIAN SAT INDEK JUMLAH TOTAL NO. URAIAN
SATUAN
HARGA
SAT INDEK JUMLAH TOTAL NO. URAIAN SAT
SATUAN
HARGA HARGA
INDEK JUMLAH TOTAL NO. URAIAN SAT INDEK
SATUAN SATUAN
HARGA
JUMLAH TOTAL NO. URAIAN SAT INDEK JUMLAH TOTAL
SATUAN
HARGA
NO. URAIAN SAT INDEK JUMLAH TOTAL NO. URAIAN
SATUAN
HARGA
SAT INDEK JUMLAH TOTAL NO. URAIAN SAT
SATUAN
HARGA HARGA
INDEK JUMLAH TOTAL NO. URAIAN SAT INDEK
SATUAN SATUAN
HARGA
JUMLAH TOTAL NO. URAIAN SAT INDEK JUMLAH TOTAL
SATUAN
HARGA
NO. URAIAN SAT INDEK JUMLAH TOTAL NO. URAIAN
SATUAN
HARGA
SAT INDEK JUMLAH TOTAL NO. URAIAN SAT
SATUAN
HARGA HARGA
INDEK JUMLAH TOTAL NO. URAIAN SAT INDEK
SATUAN SATUAN
HARGA
JUMLAH TOTAL NO. URAIAN SAT INDEK JUMLAH TOTAL
SATUAN
HARGA
NO. URAIAN SAT INDEK JUMLAH TOTAL NO. URAIAN
SATUAN
HARGA
SAT INDEK JUMLAH TOTAL NO. URAIAN SAT
SATUAN
HARGA HARGA
INDEK JUMLAH TOTAL NO. URAIAN SAT INDEK
SATUAN SATUAN
HARGA
JUMLAH TOTAL NO. URAIAN SAT INDEK JUMLAH TOTAL
SATUAN
HARGA
NO. URAIAN SAT INDEK JUMLAH TOTAL NO. URAIAN
SATUAN
HARGA
SAT INDEK JUMLAH TOTAL NO. URAIAN SAT
SATUAN
HARGA HARGA
INDEK JUMLAH TOTAL NO. URAIAN SAT INDEK
SATUAN SATUAN
HARGA
JUMLAH TOTAL NO. URAIAN SAT INDEK JUMLAH TOTAL
SATUAN
HARGA
NO. URAIAN SAT INDEK JUMLAH TOTAL NO. URAIAN
SATUAN
HARGA
SAT INDEK JUMLAH TOTAL NO. URAIAN SAT
SATUAN
HARGA HARGA
INDEK JUMLAH TOTAL NO. URAIAN SAT INDEK
SATUAN SATUAN
HARGA
JUMLAH TOTAL NO. URAIAN SAT INDEK JUMLAH TOTAL
SATUAN
HARGA
NO. URAIAN SAT INDEK JUMLAH TOTAL NO. URAIAN
SATUAN
HARGA
SAT INDEK JUMLAH TOTAL NO. URAIAN SAT
SATUAN
HARGA HARGA
INDEK JUMLAH TOTAL NO. URAIAN SAT INDEK
SATUAN SATUAN
HARGA
JUMLAH TOTAL NO. URAIAN SAT INDEK JUMLAH TOTAL
SATUAN
HARGA
NO. URAIAN SAT INDEK JUMLAH TOTAL NO. URAIAN
SATUAN
HARGA
SAT INDEK JUMLAH TOTAL NO. URAIAN SAT
SATUAN
HARGA HARGA
INDEK JUMLAH TOTAL NO. URAIAN SAT INDEK
SATUAN SATUAN
HARGA
JUMLAH TOTAL NO. URAIAN SAT INDEK JUMLAH TOTAL
SATUAN
HARGA
NO. URAIAN SAT INDEK JUMLAH TOTAL NO. URAIAN
SATUAN
HARGA
SAT INDEK JUMLAH TOTAL NO. URAIAN SAT
SATUAN
HARGA HARGA
INDEK JUMLAH TOTAL NO. URAIAN SAT INDEK
SATUAN SATUAN
HARGA
JUMLAH TOTAL NO. URAIAN SAT INDEK JUMLAH TOTAL
SATUAN
HARGA
NO. URAIAN SAT INDEK JUMLAH TOTAL NO. URAIAN
SATUAN
HARGA
SAT INDEK JUMLAH TOTAL NO. URAIAN SAT
SATUAN
HARGA HARGA
INDEK JUMLAH TOTAL NO. URAIAN SAT INDEK
SATUAN SATUAN
HARGA
JUMLAH TOTAL NO. URAIAN SAT INDEK JUMLAH TOTAL
SATUAN
HARGA
NO. URAIAN SAT INDEK JUMLAH TOTAL NO. URAIAN
SATUAN
HARGA
SAT INDEK JUMLAH TOTAL NO. URAIAN SAT
SATUAN
HARGA HARGA
INDEK JUMLAH TOTAL NO. URAIAN SAT INDEK
SATUAN SATUAN
HARGA
JUMLAH TOTAL NO. URAIAN SAT INDEK JUMLAH TOTAL
SATUAN
HARGA
NO. URAIAN SAT INDEK JUMLAH TOTAL NO. URAIAN
SATUAN
HARGA
SAT INDEK JUMLAH TOTAL NO. URAIAN SAT
SATUAN
HARGA HARGA
INDEK JUMLAH TOTAL NO. URAIAN SAT INDEK
SATUAN SATUAN
HARGA
JUMLAH TOTAL NO. URAIAN SAT INDEK JUMLAH TOTAL
SATUAN
HARGA
NO. URAIAN SAT INDEK JUMLAH TOTAL NO. URAIAN
SATUAN
HARGA
SAT INDEK JUMLAH TOTAL NO. URAIAN SAT
SATUAN
HARGA HARGA
INDEK JUMLAH TOTAL NO. URAIAN SAT INDEK
SATUAN SATUAN
HARGA
JUMLAH TOTAL NO. URAIAN SAT INDEK JUMLAH TOTAL
SATUAN
HARGA
NO. URAIAN SAT INDEK JUMLAH TOTAL NO. URAIAN
SATUAN
HARGA
SAT INDEK JUMLAH TOTAL NO. URAIAN SAT
SATUAN
HARGA HARGA
INDEK JUMLAH TOTAL NO. URAIAN SAT INDEK
SATUAN SATUAN
HARGA
JUMLAH TOTAL NO. URAIAN SAT INDEK JUMLAH TOTAL
SATUAN
HARGA
NO. URAIAN SAT INDEK JUMLAH TOTAL NO. URAIAN
SATUAN
HARGA
SAT INDEK JUMLAH TOTAL NO. URAIAN SAT
SATUAN
HARGA HARGA
INDEK JUMLAH TOTAL NO. URAIAN SAT INDEK
SATUAN SATUAN
HARGA
JUMLAH TOTAL NO. URAIAN SAT INDEK JUMLAH TOTAL
SATUAN
HARGA
NO. URAIAN SAT INDEK JUMLAH TOTAL NO. URAIAN
SATUAN
HARGA
SAT INDEK JUMLAH TOTAL NO. URAIAN SAT
SATUAN
HARGA HARGA
INDEK JUMLAH TOTAL NO. URAIAN SAT INDEK
SATUAN SATUAN
HARGA
JUMLAH TOTAL NO. URAIAN SAT INDEK JUMLAH TOTAL
SATUAN
HARGA
NO. URAIAN SAT INDEK JUMLAH TOTAL NO. URAIAN
SATUAN
HARGA
SAT INDEK JUMLAH TOTAL NO. URAIAN SAT
SATUAN
HARGA HARGA
INDEK JUMLAH TOTAL NO. URAIAN SAT INDEK
SATUAN SATUAN
HARGA
JUMLAH TOTAL NO. URAIAN SAT INDEK JUMLAH TOTAL
SATUAN
HARGA
NO. URAIAN SAT INDEK JUMLAH TOTAL NO. URAIAN
SATUAN
HARGA
SAT INDEK JUMLAH TOTAL NO. URAIAN SAT
SATUAN
HARGA HARGA
INDEK JUMLAH TOTAL NO. URAIAN SAT INDEK
SATUAN SATUAN
HARGA
JUMLAH TOTAL NO. URAIAN SAT INDEK JUMLAH TOTAL
SATUAN
HARGA
NO. URAIAN SAT INDEK JUMLAH TOTAL NO. URAIAN
SATUAN
HARGA
SAT INDEK JUMLAH TOTAL NO. URAIAN SAT
SATUAN
HARGA HARGA
INDEK JUMLAH TOTAL NO. URAIAN SAT INDEK
SATUAN SATUAN
HARGA
JUMLAH TOTAL NO. URAIAN SAT INDEK JUMLAH TOTAL
SATUAN
HARGA
NO. URAIAN SAT INDEK JUMLAH TOTAL NO. URAIAN
SATUAN
HARGA
SAT INDEK JUMLAH TOTAL NO. URAIAN SAT
SATUAN
HARGA HARGA
INDEK JUMLAH TOTAL NO. URAIAN SAT INDEK
SATUAN SATUAN
HARGA
JUMLAH TOTAL NO. URAIAN SAT INDEK JUMLAH TOTAL
SATUAN
HARGA
NO. URAIAN SAT INDEK JUMLAH TOTAL NO. URAIAN
SATUAN
HARGA
SAT INDEK JUMLAH TOTAL NO. URAIAN SAT
SATUAN
HARGA HARGA
INDEK JUMLAH TOTAL NO. URAIAN SAT INDEK
SATUAN SATUAN
HARGA
JUMLAH TOTAL NO. URAIAN SAT INDEK JUMLAH TOTAL
SATUAN
NO.
HARGA SATUAN MEKANIKAL DAN ELEKTRIKAL
NO. URAIAN SAT HARGA SATUAN 1

1 Komponen Panel :
▪ Pilot Lamp RST+Fuse bh 0
▪ Ampere Meter bh 0
▪ CT bh 0
▪ Volt Meter bh 0
▪ SSV bh 0
▪ Hz Meter bh 0
▪ KW Meter bh 0
▪ Power Factor (Cos Q) bh 0
▪ KWH Meter Analog bh 0
▪ Arrester 3P+N bh 0
▪ Motorized bh 0
▪ UVT bh 0
▪ Shunt Trip bh 0
▪ MCCB 320-800A/3P (70 kA) bh 0
▪ MCCB 320-800A/3P (50 kA) bh 0
▪ MCCB 250-630A/3P (50 kA) bh 0
▪ MCCB 160-400A/3P (50 kA) bh 0
▪ MCCB 175-250A/3P (50 kA) bh 0
▪ MCCB 175-250A/3P (36 kA) bh 0
▪ MCCB 140-200A/3P (36 kA) bh 0
▪ MCCB 112-160A/3P (36 kA) bh 0
▪ MCCB 87-125A/3P (36 kA) bh 0
▪ MCCB 70-100A/3P (50 kA) bh 0
▪ MCCB 70-100A/3P (36 kA) bh 0
▪ MCCB 56-80A/3P (36 kA) bh 0
▪ MCCB 44-63A/3P (36 kA) bh 0
▪ MCCB 225A/3P (18 kA) bh 0
▪ MCCB 125A/3P (18 kA) bh 0
▪ MCCB 100A/3P (18 kA) bh 0
▪ MCCB 60A/3P (18 kA) bh 0
▪ MCCB 32A/3P (18 kA) bh 0
▪ MCCB 80A/3P, 10 kA bh 0
▪ MCCB 30A/3P, 10 kA bh 0
▪ MCB 6A/3P, 10 kA bh 0
▪ MCB 10A/3P, 10 Ka bh 0
▪ MCB 16A/3P, 10 kA bh 0
▪ MCB 20A/3P, 10 kA bh 0
▪ MCB 25A/3P, 10 kA bh 0
▪ MCB 32A/3P, 10 kA bh 0
▪ MCB 40A/3P, 10 kA bh 0
▪ MCB 50A/3P, 10 kA bh 0
▪ MCB 63A/3P, 10 kA bh 0
▪ MCB 80A/3P, 10 kA bh 0
▪ MCB 100A/3P, 10 kA bh 0
▪ MCB 6A/3P, 6kA bh 0
▪ MCB 10A/3P, 6kA bh 0
▪ MCB 16A/3P, 6kA bh 0
▪ MCB 20A/3P, 6kA bh 0
▪ MCB 25A/3P, 6kA bh 0
▪ MCB 32A/3P, 6kA bh 0
▪ MCB 40A/3P, 6kA bh 0
▪ MCB 50A/3P, 6kA bh 0
▪ MCB 63A/3P, 6kA bh 0
▪ MCB 6A/1P, 4,5kA bh 0
▪ MCB 10A/1P, 4,5kA bh 0
▪ MCB 16A/1P, 4,5kA bh 0
▪ MCB 20A/1P, 4,5kA bh 0
▪ MCB 32A/1P, 4,5kA bh 0
▪ MCB 6A/1P,6kA bh 0
▪ MCB 10A/1P,6kA bh 0
▪ MCB 16A/1P, 6kA bh 0
▪ MCB 20A/1P, 6kA bh 0
▪ MCB 63A/1P, 6kA bh 0
▪ Cos 4P lengkap Auxiliary set 0
2 Instalasi Kabel Feeder Instalasi Tegangan Rendah
▪ Kabel TR, NYA 1 x 2,5 mm² m' 0
▪ Kabel TR, NYA 1 x 4 mm² m' 0
▪ Kabel TR, NYM 2 x 1,5 mm² m' 0
▪ Kabel TR, NYM 3 x 2,5 mm² m' 0
▪ Kabel TR, NYY 4 x 2,5 mm² m' 0
▪ Kabel TR, NYY 4 x 4 mm² m' 0
▪ Kabel TR, NYY 4 x 6 mm² m' 0
▪ Kabel TR, NYY 4 x 10 mm² m' 0
▪ Kabel TR, NYY 4 x 16 mm² m' 0
▪ Kabel TR, NYY 4 x 25 mm² m' 0
▪ Kabel TR, NYY 4 x 35 mm² m' 0
▪ Kabel TR, NYY 4 x 50 mm² m' 0
▪ Kabel TR, NYY 4 x 70 mm² m' 0
▪ Kabel TR, NYY 4 x 95 mm² m' 0
▪ Kabel TR, NYY 4 x 120 mm² m' 0
▪ Kabel TR, NYY 4 x 150 mm² m' 0
▪ Kabel TR, NYY 4 x 185 mm² m' 0
▪ Kabel TR, NYMHy 3 x 2.5 mm² m' 0
▪ Kabel TR, NYMHy 2 x 1.5 mm² m' 0
▪ Kabel TR, NYFGbY 4 x 25 mm² m' 0
▪ Kabel TR, NYFGbY 4 x 35 mm² m' 0
▪ Kabel TR, NYFGbY 4 x 70 mm² m' 0
▪ Kabel TR, NYFGbY 4 x 95 mm² m' 0
▪ Kabel TR, NYFGbY 4 x 240 mm² m' 0
▪ Kabel BC 120 mm² m' 0
▪ Kabel BC 95 mm² m' 0
▪ Kabel BC 70 mm² m' 0
▪ Kabel BC 50 mm² m' 0
▪ Kabel BC 35 mm² m' 0
▪ Kabel BC 16 mm² m' 0
▪ Kabel BC 10 mm² m' 0
▪ Kabel BC 6 mm² m' 0
▪ ITC Cable 2 x 2 x 0,6 mm² m' 0
▪ ITC Cable 10 x 2 x 0,6 mm² m' 0
▪ ITC Cable 20 x 2 x 0,6 mm² m' 0
▪ UTP Cable 4 Pairs (Cat 5e) m' 0
▪ UTP Cable 4 Pairs (Cat 6) m' 0
▪ Coaxial RG 6 / AWG m' 0
▪ Coaxial RG 11 / AWG m' 0
▪ STP AWG18 1P m' 0
3 Armature lampu
Normal :
▪ Lampu Baret SCB 20 ACR TLC 22 W + Battery bh 0
Emergency
▪ Lampu Down Box Light RD 125 E 27 Esential 8 w Cover bh 0
Glass
▪ Lampu Down Light RD 150 E 27 Esential 14 w Cover bh 0
Glass
▪ Lampu Down Light RD 150 PLC 18 W bh 0
▪ Lampu RM 300 2x36 M2 TL-D - 2x36w Electronic Ballast bh 0
▪ Lampu RM 300 2x36 ACR TL- D 2X36 w Electronic bh 0
▪Ballast Lampu RMO 2x36 w Electronic Ballast bh 0
▪ Lampu Balk BLCG 1x18 w Electronic Ballast bh 0
▪ Highbay Industrial Light I B 40 - HPLN 250 w Magnetic bh 0
Ballast
Led :
▪ Lampu Baret SCB 20 ACR Led Basic Plat 22 W + Battery bh 0
▪Emergency
Lampu DownBox Light RD 125 E 27 Leb Bulb 4 w Cover bh 0
▪Glass Lampu Down Light RD 150 E 27 Leb Bulb 8 w Cover bh 0
▪GlassLampu Down Light Comport 150-75 Led DLS 13,6 - bh 0
▪1200lm
Lampu RM 300 2x36 M2 T- Led Esential - 2x14,5 W bh 0
▪3200lm
Lampu RM 300 2x36 ACR T- Led Esential 2x14,5 W bh 0
▪3200lm
Lampu RMO T 2x36 T led Essential 2x14,5 Watt 3200lm bh 0
▪ Lampu Balk BLCG 1x18 T Led Esential 8 W bh 0
▪ Highbay Helios 150 W Led bh 0
▪ Emergency Kit c/w Battery & Charge Min. 2 Hours bh 0
4 Backup Peralatan Instalasi :
▪ Saklar 1 Gang 1 Way bh 0
▪ Saklar 2 Gang 1 Way bh 0
▪ Saklar 1 Gang 2 Way bh 0
▪ Stop Kontak Umum 1 Gang ( 2P+E ) Schuko - 250 V w/ bh 0
▪Safety StopShutter
Kontak Komputer (UPS) 1 Gang ( 2P+E ) Schuko - bh 0
▪250Stop V w/Kontak
Safety Medis
Shutter
(UPS) 1 Gang ( 2P+E ) Schuko - 250 bh 0
▪V w/ Safety
Stop Shutter
Kontak AC 1 Gang ( 2P+E ) 13 A - 3 Pin British bh 0
▪Standard w/ Neon
Stop Kontak Sign Outbow ( 2P+E ) Schuko - 250 V
Peralatan bh 0
▪ Stop Kontak Peralatan Outbow ( 3P+E ) - 400 V / IP44 bh 0
▪ Plugs 16 A / ( 3P+E ) - 400 V / IP44 bh 0
▪ Telepon Outlets ( FCC Standard ) /w Surround 1 Gang - bh 0
▪6 Wire Outlet Data Cat6 c/w Modular Jack bh 0
▪ Outlet Televisi 1 Gang 75 Ohm bh 0
▪ Inbow doos plastic boks bh 0
▪ Pipa PVC High Impact 20 mm² m' 0
▪ Socket Pipa bh 0
▪ Tee Doos bh 0
▪ Klem Pipa bh 0
▪ Fhiser bh 0
▪ Las Doop bh 0
▪ Isolasi ban bh 0
▪ Ceiling Mounted Exhaust Fan 10 " KM/WC, 36,8 W / 220 bh 0
▪V / Wall 564 CMH
Mounted Industrial Fan 16", 73,9 W / 220 V / 2.010 bh 0
▪CMH Auto Ceiling Mounted Fan 16 " 55 W / 220 V / 65,5 CMM bh 0
▪ HIGH PRESSURE INDUSTRIAL FAN, 350 W / 220 V / bh 0
▪8350 CMH
Axial Flow Industrial Fan ( Ekshaust ) bh 0
600 CMH - 0,05~0,08 INCH/100FT - 50 HZ - 34 WATT - 0
▪1.451 UPS RPM
Powerscale 3-3 ( 7,5kVA ) / Cabinet B / Battery ( 1 x bh 0
▪48 UPS ) x 7 Ah
Powerscale 3-3 ( 10 kVA ) / Cabinet B / Battery ( 1 x bh 0
▪48 UPS) x 7 Ah
Powerscale 3-3 ( 20 kVA ) / Cabinet B / Battery ( 2 x bh 0
▪48 UPS
) x 7 Ah
Powerscale 3-3 ( 30 kVA ) / Cabinet C / Battery ( 2 x bh 0
▪48 UPS
) x 7 Ah
Powerscale 3-3 ( 40 kVA ) / Cabinet C / Battery ( 2 x bh 0
▪48 Overhead
) x 7 Ah Single Girder Crane Kapasitas 5 ton bh 0
5 Elektronika 0
▪ PABX KX-TES824ND kapasitas 8 line / 24 extention : set 0
▪ Pesawat Telephone Analog KX-T505 set 0
▪ Main Distribution Frame Kapasitas 1 x 20 pair set 0
▪ UPS Smart-1000VA 230V set 0
▪ UPS Smart-650VA 230V set 0
▪ Terminal BOX c/w LSA 1 x 10 pairs bh 0
▪ Server Intel Xeon Dual Core E5503 (1.6Ghz 1066Mhz, set 0
4MB
1x L2,| (80W)
2GB 250GB 7200rpm Simple Swap SATA | Integrated 0
Management
DVD-ROM Module(IMM)
| Either Eight 2.5-inch SFF SAS hot swap disk 0
bays or Four
Ethernet 3.5-inch slots
| Expansion SAS | USB 0
▪ Patch Panel / Wallmount 2 U bh 0
▪ Patch Panel / Wallmount 4 U bh 0
▪ Patch Panel / Wallmount 8 U bh 0
▪ Patch Panel / Wallmount 12 U bh 0
▪ Patch Panel / Wallmount 15 U bh 0
▪ Closed Rack 42 U bh 0
▪ 8-port UTP, 10/100Mbps, Auto-sensing, Unmanaged bh 0
▪ 16-port UTP, 10/100Mbps, Auto-sensing, Unmanaged bh 0
▪ 24-port UTP, 10/100Mbps, Auto-sensing, Unmanaged bh 0
▪ Antenna Yagi UHF / VHF 25 Element bh 0
▪ Booster TV : bh 0
Freq (MHz) 48,5 - 956
Impedence 300 / 75
Max Output Level 148
Noise Coeffecient < 1
Power Input 220 V
▪ Intelligent Addressable Master Control Fire Alarm set 0
▪ Smoke Detector Conventional bh 0
▪ ROR Heat Detector bh 0
▪ Fixed Heat Detector bh 0
▪ Break Glass bh 0
▪ Alarm Bell bh 0
▪ Indicator Lamp bh 0
▪ Zone Module bh 0
▪ Control Module bh 0
▪ Mini Monitor Module bh 0
▪ Terminal Box Fire Alarm for 6 module (550 x 475 x 150) set 0
▪ Addressable Photoelectric Smoke Detector bh 0
▪ Manual Release Station bh 0
▪ Manual Abort Station bh 0
▪ Alarm Bell bh 0
▪ Strobe Light with Horn bh 0
▪ Evacuate Sign Lamp bh 0
▪ Discharge Sign Lamp bh 0
▪ Ceiling Speaker 6 Watt bh 0
▪ Ceiling Speaker 6 Watt, metal grill c/w firedome (EVAC) bh 0
▪ Horn speaker, daya 15 watt, high impedance bh 0
▪ Volume Control 36W bh 0
▪ Power Amplifier 240 W bh 0
▪ Power Amplifier 120 W bh 0
▪ Mixer Pre Amplifier / Sistem Controller bh 0
▪ DVD /CD/MP3/MP4 Player + Radio Tuner bh 0
▪ Paging Microphone & Chime Tone + Key Pad bh 0
▪ Selector Switch 6 zone bh 0
▪ Main Distibution Frame (MDF) Sound System bh 0
▪ Kabinet Rack lengkap blower junction dan aksesories + bh 0
Rectifier, Battery charger
▪ Dome CCTV Camera CAD 560 set 0
Features:
• 1/3" SONY Super HAD CCD
• 560 TV lines (High Resolution)
• 0.05Lux/F1.2
• 2.5 mm / 3.8 mm / 6.0 mm Lens (selectable)
• 12 VDC Input Voltage

▪ DVR Standalone 16ch H.264 Networking HD-DVR-1016 set 0


▪ Monitor LCD 23" set 0

▪ IP Dome CCTV Camera NDC 225 P set 0


Features:
• 1/4″ CMOS
• VGA Color
• 4mm Lens
• Built-in microphone
• Storage inside camera
▪ Digital Video Recorder 8ch 500 GB Networking DVR-630- set 0
▪08A50
Digital Video Recorder 16ch 500 GB Networking DVR- set 0
▪630-16A50
Monitor LCD 23" set 0
▪ Kabel Tray GI perforated Type C 300x3000x100 m' 0
▪ Kabel Tray GI perforated Type C 200x3000x100 m' 0
▪ Kabel Ladder GI perforated Type C 300x3000x100 m' 0
▪ Kabel Trunking PVC 100x50 m' 0
▪ Dome Corridor Light Indicator,2 Colors bh 0
▪ Bed Station with Speaker and Mic bh 0
▪ Bedside Call Cord Pendant bh 0
▪ Bathroom Call with Pull Cord bh 0
▪ Reset Button bh 0
▪ Nurse Station Equipment
- Digital Corridor Display bh 0
- Master Station 40 Channel bh 0
- Call Report Software bh 0
▪ Nurse Station Equipment Lantai-02
- Digital Corridor Display bh 0
- Master Station 30 Channel bh 0
- Call Report Software bh 0
▪ Nurse Station Equipment Lantai-03
- Digital Corridor Display bh 0
- Master Station 20 Channel bh 0
- Call Report Software bh 0
6 Mekanikal
▪ Pompa transfer otomatis - semi jet ( JP Basic 7 ) set 0
Daya listrik 1800 W, 1 Phase, 220 Volt
Kapasitas = 100 liter/menit, Head = 40 meter
▪ Pompa booster stainless steel otomatis ( CH8-40) set 0
Kapasitas = 120 liter/menit, Head = 40 meter
▪ Pompa booster stainless steel otomatis ( CH4-60) set 0
Kapasitas = 70 liter/menit, Head = 40 meter
▪ Preiming Tank Kap. 1 m3 set 0
▪ Tandon Atas Kap. 1.100 ltr set 0
▪ Tandon Atas Kap. 2.200 ltr set 0
▪ Tandon Atas Stainless Steel Kap. 3.300 ltr set 0
▪ Reverse Osmosis Treatment ( 50-100 liter / menit ) set 0
▪ Reverse Osmosis Treatment ( 100-200 liter / menit ) set 0
▪ Water Heater Elektric Kap. 15 ltr set 0
▪ Water Heater Elektric Kap. 30 ltr set 0
▪ Pemipaan Polypropelyne ( PPR ) Class PN.10 :
Ø 20 mm / ½" m' Rp
Ø 25 mm / ¾" m' 0
Ø 32 mm / 1" m' 0
Ø 40 mm / 1¼" m' 0
Ø 50 mm / 1½ m' 0
Ø 90 mm / 3" m' 0
▪ Pemipaan Polypropelyne ( PPR ) Class PN.20 :
Ø 25 mm / ¾" m' 0
Ø 32 mm / 1" m' 0
Ø 40 mm / 1¼" m' 0
Ø 50 mm / 1½ m' 0
▪ Gate Valve, Bronze Body, Screwed, Class 125
Ø 25 mm / ½" bh 0
Ø 25 mm / ¾" bh 0
Ø 32 mm / 1" bh 0
Ø 40 mm / 1¼" bh 0
Ø 50 mm / 1½ bh 0
▪ Pemipaan PVC AW Kelas 10 kg/cm² :
Ø 32 mm / 1” m' 35000 35000
Ø 40 mm / 1¼" bh 40000 40000
Ø 60 mm / 2” m' 65000 65000
Ø 76 mm / 2 ½” m' 75000 75000
Ø 89 mm / 3” m' 95000 95000
Ø 114 mm / 4” m' 125000 125000
Ø 140 mm / 5” m' 135000 135000
Ø 165 mm / 6” m' 225000 225000
▪ Pemipaan PVC AS Kelas 10 kg/cm² :
Ø 60 mm / 2” m' 65000 65000
Ø 76 mm / 2 ½” m' 75000 75000
Ø 89 mm / 3” m' 95000 95000
Ø 114 mm / 4” m' 125000 125000
▪ Floor Clean Out Ø 89 mm / 3” bh 0
▪ Clean Out Ø 89 mm / 3” bh 0
▪ Sumpit Air Bekas Kapasitas 0,5 m³ ls 0
▪ Sumpit Air Bekas Kapasitas 2 m³ ls 0
▪ SUMERSIBLE PUMP SPLIT CUTTER set 0
Stainless Steel Kap : 120 ltr/mnt @ 7 m
Diameter partikel maks 10mm
c/w Panel Kontrol dan WLC
▪ Septic Tank Bio Filter Kap. 8 m³ set 0
▪ Septic Tank Bio Filter Kap. 6 m³ set 0
▪ Septic Tank Bio Filter Kap. 5 m³ set 0
▪ Septic Tank Bio Filter Kap. 4 m³ set 0
▪ Septic Tank Bio Filter Kap. 3 m³ set 0
▪ Septic Tank Bio Filter Kap. 2 m³ set 0
▪ Septic Tank Bio Filter Kap. 1 ½ m³ set 0
▪ Septic Tank Bio Filter Kap. 1 m³ set 0
▪ Peresapan set 0
▪ Grease trap portable (stainlees steel) set 0
7 Gas Medis
Sentral Oksigen (O2) Kapasitas 2 x 5 Cylinder (Manual) set 0
▪ Regulator
▪ Header Manifold
▪ Cylinder Lead
▪ Support dan Rak Silinder

Sentral (N2O) Kapasitas 2 x 2 Cylinder (Manual) set 0


▪ Regulator
▪ Header Manifold
▪ Cylinder Lead
▪ Support dan Rak Silinder

Sentral Vaccum (DUPLEX SYSTEM) set 0


▪ Vacuum Pump Kapasitas 41m3/h, 1.5Kw, 3ph "Becker"
Germany
▪ Vacuum Tank (Volume 300 liter)-lokal
▪ Bacterial Filter-type MVAK Ultrafilter Germany
▪ Control Panel -lokal

Sentral Compress Air (DUPLEX SYSTEM) set 0


▪ Compressor HITACHI 2.2KW
▪ Compressor Tank (vol. 300Ltr) - lokal
▪ Compressor Switch
Master Alarm for 4 Gases unit 0
Zone Valve for 4 gases unit 0
Master Alarm for 3 Gases unit 0
Zone Valve for 3 gases unit 0
Master Alarm for 2 Gases unit 0
Zone Valve for 2 gases unit 0
Wall Outlet for Oxygen DISS, SIS, JIS bh 0
Wall Outlet for N2O DISS, SIS, JIS bh 0
Wall Outlet for Compress Air DISS, SIS, JIS bh 0
Wall Outlet for Vacuum DISS, SIS, JIS bh 0
Wall Outlet for Gas Anestetic Scavenging DISS, SIS, JIS bh 0
Pendant R. OK ( One Arm Archline ) bh 0
Pengadaan dan Pasang panel Bedhead single unit bh 0
Dimensi : 1200 mm x 80mm x 220mm
Material : Aluminium, powder coating
Accessories :
▪ power switch
▪ power plug
▪ 1x T4 Fluoresent Lamp for direct light
▪ Provision for medical gases
Pengadaan dan Pasang panel Bedhead single unit bh 0
Dimensi : 3600 mm x 80mm x 220mm
Material : Aluminium, powder coating
Accessories :
▪ power switch
▪ power plug
▪ 1x T4 Fluoresent Lamp for direct light
▪ Provision for medical gases
Pengadaan dan Pasang panel Bedhead single unit bh 0
Dimensi : 8000 mm x 80mm x 220mm
Material : Aluminium, powder coating
Accessories :
▪ power switch
▪ power plug
▪ 1x T4 Fluoresent Lamp for direct light
▪ Provision for medical gases
Pengadaan dan Pasang panel Bedhead single unit bh 0
Dimensi : 10000 mm x 80mm x 220mm
Material : Aluminium, powder coating
Accessories :
▪ power switch
▪ power plug
▪ 1x T4 Fluoresent Lamp for direct light
▪ Provision for medical gases

Pemipaan Gas Medis ( Seamless Copper Tube ) Straight


Tube
Type L- Medical Grade ASTM B 819 ( panjang pipa 5,8 m )
▪ Ø 3/8" x 0,76 mm m' 0
▪ Ø 1/2" x 0,89 mm m' 0
▪ Ø 5/8" x 1,02 mm m' 0
▪ Ø 3/4" x 1,07 mm m' 0
▪ Ø 7/8" x 1,14 mm m' 0
▪ Ø 1 1/8" x 1,27 mm m' 0
▪ Ø 1 3/8" x 1,4 mm m' 0
▪ Ø 1 5/8" x 1,52 mm m' 0
▪ Ø 2 1/8" x 1,52 mm m' 0
8 Pekerjaan Hydrant & Sprinkler
Pemipaan BSP Schedule 40 / ASTM A 53:
▪ Ø 15 mm / ½” unit 0
▪ Ø 20 mm / ¾” unit 0
▪ Ø 25 mm / 1” unit 0
▪ Ø 32 mm / 1 ¼” unit 0
▪ Ø 40mm / 1 ½” unit 0
▪ Ø 50 mm / 2” unit 0
▪ Ø 65 mm / 2 ½” unit 0
▪ Ø 80 mm / 3” unit 0
▪ Ø 100 mm / 4” unit 0
▪ Ø 125 mm / 5” unit 0
▪ Ø 150 mm / 6” unit 0
Hydrant Boks Type B ( Indoor Type ) unit 0
Protector Sprinkler Head ½" ( 68º C ) c/w Ceiling Plate unit 0
Flushing Valve : 0
- Ø 25 mm / 1” unit 0
Automatic Air Vent unit 0
Presure gauge 1" unit 0
Flowmeter 100mm unit 0
Presure Reducing Valve unit 0
Pillar Hydrant Two Way c/w Main & Ball Valve unit 0
Gate Valve, Cast Iron Body, Flanged End, JIS - 10 K 0
▪ Ø 125 mm / 5” unit 0
▪ Ø 100 mm / 4” unit 0
▪ Ø 80 mm / 3” unit 0
▪ Ø 65 mm / 2 ½” unit 0
▪ Ø 50 mm / 2” unit 0
▪ Ø 40mm / 1 ½” unit 0
▪ Ø 25 mm / 1” unit 0
Strainer, Cast Iron Body, Flanged End, JIS-10K 0
▪ Ø 125 mm / 5” unit 0
▪ Ø 100 mm / 4” unit 0
▪ Ø 80 mm / 3” unit 0
▪ Ø 65 mm / 2 ½” unit 0
▪ Ø 50 mm / 2” unit 0
Check valve, Cast Iron Body, Flanged End, JIS-10K 0
▪ Ø 125 mm / 5” unit 0
▪ Ø 100 mm / 4” unit 0
▪ Ø 65 mm / 2 ½” unit 0
▪ Ø 50 mm / 2” unit 0
Rubber Fleksible Joint 10 Bar Union Screwed Double 0
▪ Ø 125 mm / 5” unit 0
▪ Ø 65 mm / 2 ½” unit 0

9 Tata Udara
▪ unit 0
▪ AC Standard Split Wall Mounted ¾ PK 7.000 btu/H unit 0
▪ AC Standard Split Wall Mounted 1 PK 9.000 btu/H unit 0
▪ AC Standard Split Wall Mounted 1½ PK 12.000 btu/H unit 0
▪ AC Standard Split Wall Mounted 2 PK 18.000 btu/H unit 0
▪ AC Standard Split Wall Mounted 2½ PK 24.000 btu/H unit 0
▪ AC Cassete Standard Class 12.000 btu/H Wireless unit 8000000 8000000
▪ AC Cassete Standard Class 18.000 btu/H Wireless unit 12000000 12000000
▪ AC Cassete Standard Class 21.000 btu/H Wireless unit 15000000 15000000
▪ AC Cassete Standard Class 24.000 btu/H Wireless unit 20000000 20000000
▪ AC Cassete Standard Class 28.000 btu/H Wireless unit 22000000 22000000
▪ AC Cassete Standard Class 30.000 btu/H Wireless unit 25000000 25000000
▪ AC Cassete Standard Class 36.000 btu/H Wireless unit 27000000 27000000
▪ AC Cassete Standard Class 42.000 btu/H Wireless unit 29000000 29000000
▪ AC Cassete Standard Class 48.000 btu/H Wireless unit 32000000 32000000
Seng : 0
- Seng BJLS 80 m² 0
- Seng BJLS 70 m² 0
- Seng BJLS 60 m² 0
- Seng BJLS 50 m² 0
BAHAN ISOLASI 0
- Glaswool, Density 24 Kg/M3 m² 0
- Alluminium Foil, Double Side Fire Resistance m² 0
- Alumunium Tipe, lebar 2" m' 0
- Flinkote m² 0
Fleksibel Duct Ø 12” Non Isolasi m' 0
Supply Air Difusher ( SAD ) 14 ' x 14 " bh 0
Return Air Grille ( RAG ) 16" x 12 " bh 0
Pemipaan HVAC ( Cu ) Type ASTM B280 0
▪ Ø ¼” + Aeroflex 1/2 inch ( 13mm ) m' 0
▪ Ø ⅜” + Aeroflex 1/2 inch ( 13mm ) m' 0
▪ Ø ½” + Aeroflex 1/2 inch ( 13mm ) m' 0
▪ Ø ⅝” + Aeroflex 1/2 inch ( 13mm ) m' 0
▪ Ø ¾” + Aeroflex 1/2 inch ( 13mm ) m' 0
▪ Ø ⅞” + Aeroflex 1/2 inch ( 13mm ) m' 0
▪ Ø 1” + Aeroflex 1/2 inch ( 13mm ) m' 0
▪ Ø 1 ⅛” + Aeroflex 1/2 inch ( 13mm ) m' 0
▪ Ø 1 ¼” + Aeroflex 1/2 inch ( 13mm ) m' 0
▪ Ø 1 ⅜” + Aeroflex 1/2 inch ( 13mm ) m' 0
▪ Ø 1 ⅝” + Aeroflex 1/2 inch ( 13mm ) m' 0