NO URAIAN PEKERJAAN VOLUME
JASA BAHAN

I Pendahuluan
1 Administrasi dan dokumentasi 1.000 ls 164,509,000.00
2 Uitzet, shop drawing dan asbuilt drawing 1.000 ls 30,000,000.00 2,000,000.00
3 Sewa peralatan safety 1.000 ls 60,000,000.00
4 Biaya medical check up 50.000 ls 1,500,000.00
Persyaratan pengurusan SIML, meliputi:
anamnesa, pemeriksaan fisik dokter, rontgen
thorax, EKG, dan pemeriksaan laboratorium
(darah dan urin rutin, gula darah puasa, dan
Profil lipid)
5 Pembuatan direksi keet dan gudang 32.000 m² 600,000.00 1,500,000.00
6 Pembuatan rambu-rambu informasi 1.000 ls 10,000,000.00
7 Uji bahan material perkerasan/ laboratorium material 1.000 ls 50,000,000.00
8 Tes laboratorium Tanah 1.000 ls 40,000,000.00

Sub Total I

II Pengadaan Material dan Alat


1 Geotextile 11,880.000 m² 28,000.00
Luas terpasang pada jalan, sudah termasuk
Overlap dan lain-lain
2 Tanah timbun pilihan 5,500.000 m³ 110,000.00
3 Boulder stone (15 cm - 20 cm) 2,200.000 m³ 590,000.00
Volume material terpasang padat pada jalan
4 Grevel (3 cm - 5 cm) 550.000 m³ 590,000.00
Volume material terpasang pada jalan
5 Basecourse B 550.000 m³ 600,000.00
Volume material terpasang pada jalan
6 Bulk material handling (unloading at landing side) lot 40,000.00
7 Uji CBR lapangan 1.000 lot 40,000,000.00

Sub Total II

III Pekerjaan Konstruksi Jalan


1 Persiapan pondasi jalan
- Perataan elevasi jalan 5,940.000 m³ 32,500.00
- Pemadatan pondasi jalan 2,970.000 m³ 30,000.00
2 Pemasangan material lining
- Menggelar material geotex tile 11,880.000 m² 26,000.00
3 Penimbunan badan jalan
- Mobilisasi tanah timbun 5,500.000 m³ 60,000.00
- Penyebaran tanah timbun 5,500.000 m³ 27,000.00
- Pembentukan badan jalan 11,880.000 m² 8,000.00
- Pemadatan tanah timbun jalan 5,500.000 m³ 30,000.00
4 Perkerasan jalan
- Perataan sirtu 1,100.000 m³ 30,000.00
- Pemadatan sirtu 1,100.000 m³ 30,000.00
- Perataan material batu 1,100.000 m³ 155,000.00
- Perataan material pengisi 220.000 m³ 135,000.00
- Pembentukan badan jalan 11,880.000 m² 8,000.00
- Pemadatan perkerasan jalan 1,100.000 m³ 40,000.00
5 Saluran air
- Pembentukan saluran tanah 4,400.000 m¹ 22,000.00

Sub Total III

IV Transportasi

1
1 Mobilisasi alat dan personil
- Mobilisasi peralatan SLW-A - SLW-N PP 4.000 trip
Jarak tempuh 14 km, Pulau Salawati, per alat berat
- Mobilisasi material dan alat berat Sorong-Salawati 4.000 trip
Volume estimasi 1 trip 2200 DWT
- Mobilisasi material Canal-SLW-A 1.000 lot
- Mobilisasi material Canal-SLW-N 1.000 lot
- Mobilisasi personil PP 2.000 lot

Sub Total IV

Jumlah Total
Dibulatkan

2
DAN DRAINASE DI LAPANGAN PRODUKSI SALAWATI
R - PANJANG 2200 METER)
EP ASSET 4 PAPUA FIELD

RGA SATUAN JUMLAH HARGA SATUAN


JUMLAH
ALAT JASA BAHAN ALAT

164,509,000.00 164,509,000.00
2,000,000.00 2,000,000.00
60,000,000.00 60,000,000.00
75,000,000.00 75,000,000.00

19,200,000.00 48,000,000.00 67,200,000.00


10,000,000.00 10,000,000.00
50,000,000.00 50,000,000.00
40,000,000.00 40,000,000.00

358,709,000.00 110,000,000.00 468,709,000.00

332,640,000.00 332,640,000.00

605,000,000.00 605,000,000.00
1,298,000,000.00 1,298,000,000.00

324,500,000.00 324,500,000.00

330,000,000.00 330,000,000.00

- -
40,000,000.00 40,000,000.00

40,000,000.00 2,890,140,000.00 2,930,140,000.00

193,050,000.00 193,050,000.00
89,100,000.00 89,100,000.00

308,880,000.00 308,880,000.00

330,000,000.00 330,000,000.00
148,500,000.00 148,500,000.00
95,040,000.00 95,040,000.00
165,000,000.00 165,000,000.00

33,000,000.00 33,000,000.00
33,000,000.00 33,000,000.00
170,500,000.00 170,500,000.00
29,700,000.00 29,700,000.00
95,040,000.00 95,040,000.00
44,000,000.00 44,000,000.00

96,800,000.00 96,800,000.00

1,831,610,000.00 1,831,610,000.00

3
23,000,000.00 92,000,000.00 92,000,000.00

352,000,000.00 1,408,000,000.00 1,408,000,000.00

140,000,000.00 140,000,000.00 140,000,000.00


320,000,000.00 320,000,000.00 320,000,000.00
30,000,000.00 60,000,000.00 60,000,000.00

2,020,000,000.00 2,020,000,000.00

2,230,319,000.00 3,000,140,000.00 2,020,000,000.00 7,250,459,000.00


7,250,450,000.00

4
Table 1

panjang lebar tinggi faktor

1 Administrasi dan dokumentasi


2 Uitzet, shop drawing dan asbuilt drawing
3 Sewa peralatan safety
4 Biaya medical check up
Persyaratan pengurusan SIML, meliputi:
anamnesa, pemeriksaan fisik dokter, rontgen
thorax, EKG, dan pemeriksaan laboratorium
(darah dan urin rutin, gula darah puasa, dan
Profil lipid)
5 Pembuatan direksi keet dan gudang 8 4
6 Pembuatan rambu-rambu informasi
7 Uji bahan material perkerasan/ laboratorium material
8 Tes laboratorium Tanah

1 Geotex tile 2200 5.4


Luas terpasang pada jalan, sudah termasuk
Overlap dan lain-lain
2 Tanah timbun pilihan 2200 5 0.5
3 Boulder stone (15 cm - 20 cm) 2200 5 0.2
Volume material terpasang padat pada jalan
4 Grevel (3 cm - 5 cm) 2200 5 0.05
Volume material terpasang pada jalan
5 Basecourse B 2200 5 0.05
Volume material terpasang pada jalan
6 Bulk material handling (unloading at landing side)
7 Uji CBR lapangan

1 Persiapan pondasi jalan


Perataan elevasi jalan 2200 5.4 0.5
Pemadatan pondasi jalan 2200 5.4 0.25
2 Pemasangan material lining
Menggelar material geotex tile 2200 5.4
3 Penimbunan badan jalan
Mobilisasi tanah timbun 2200 5 0.5
Penyebaran tanah timbun 2200 5 0.5
Pembentukan badan jalan 2200 5.4
Pemadatan tanah timbun jalan 2200 5 0.5
4 Perkerasan jalan
Perataan sirtu 2200 5 0.1
Pemadatan sirtu 2200 5 0.1
Perataan material batu 2200 5 0.1
Perataan material pengisi 2200 5 0.1 0.2
Pembentukan badan jalan 2200 5.4
Pemadatan perkerasan jalan 2200 5 0.1
5 Saluran air
Pembentukan saluran tanah 2200 2