4 PEKERJAAN MEKANIKAL DAN ELEKTRIKAL


GEDUNG PERTEMUAN GEREJA OSZA - SOLO - JAWA TENGAH

PENJUMLAHAN PEKERJAAN MEKANIKAL DAN ELEKTRIKAL

No. Uraian Pekerjaan Sub Total Total

DAFTAR No. 4.1 : PEKERJAAN ELEKTRIKAL Rp. 84,585,000


GEDUNG A Rp. 47,857,500
GEDUNG B Rp. 36,727,500

DAFTAR No. 4.2 : PEKERJAAN TELEPON & DATA Rp. 22,500,000


MAIN EQUIPMENT Rp. 16,900,000
GEDUNG A Rp. 4,800,000
GEDUNG B Rp. 800,000

DAFTAR No. 4.3 : PEKERJAAN FIRE ALARM Rp. #VALUE!


MAIN EQUIPMENT Rp. #VALUE!
GEDUNG A Rp. #VALUE!
GEDUNG B Rp. #VALUE!

DAFTAR No. 4.4 : PEKERJAAN TATA SUARA Rp. By Owner


MAIN EQUIPMENT Rp. By Owner
GEDUNG A Rp. By Owner
GEDUNG B Rp. By Owner

DAFTAR No. 4.5 : PEKERJAAN PLUMBING Rp. 35,044,500


MAIN EQUIPMENT Rp. 3,500,000
GEDUNG A Rp. 21,602,000
GEDUNG B Rp. 9,942,500

DAFTAR No. 4.6 : PEKERJAAN VAC Rp. 41,250,000


GEDUNG A Rp. 25,100,000
GEDUNG B Rp. 16,150,000

DAFTAR No. 4.7 : PEKERJAAN LIFT Rp.


GEDUNG A Rp.
GEDUNG B Rp.

DAFTAR No. 4.8 : PEKERJAAN PENANGKAL Ke-Pek.Tambh kurang


PETIR EF TYPE RAD. 70 MTR

TESTING & COMMISSIONING Rp.

BIAYA PEMELIHARAAN SAMPAI BAST 2 Rp.

TOTAL PEKERJAAN MEKANIKAL DAN ELEKTRIKAL Rp. #VALUE!

4
DAFTAR NO. 4 PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
GEDUNG PERTEMUAN GEREJA OSZA - SOLO - JAWA TENGAH

DAFTAR NO. 4.1 PEKERJAAN ELEKTRIKAL

No. Uraian Pekerjaan Unit Qty Harga Satuan Total Harga

I Catatan harga berikut berlaku untuk semua pekerjaan yang berkaitan dengan
pengadaan dan pemasangan Sistem Elektrikal yang secara menyeluruh
mengacu pada Spesifikasi dan Gambar yang diterbitkan untuk tender, kecuali
bila disebutkan lain.

II Pemborong wajib menghitung volume (jumlah satuan) pekerjaan yang telah


dituangkan dalam Bill of Item (BQ) oleh Quantity Surveyor. Jika menurut
perhitungan Pemborong terdapat item pekerjaan yang belum tercantum atau
tidak sesuai dengan Gambar referensi yang bersangkutan, maka Pemborong
dapat melakukan koreksi dengan menambahkan dan atau mengurangi item
pekerjaan pada lampiran yang khusus dibuat untuk itu.

III Semua resiko baik mengenai salah hitung terhadap harga maupun jumlah
satuan dan item yang diajukan dan biaya - biaya lain yang tak terduga adalah
tetap menjadi tanggung jawab Pemborong.

IV Dalam memberikan harga pada semua item pekerjaan ini Pemborong harus
sudah mempertimbangkan untuk memasukan semua biaya pengeluaran
pekerjaan dan tidak ada tuntutan dikemudian hari terhadap Pemberi Tugas
bila Daftar Uraian Pekerjaan / BQ ini dipandang tidak lengkap oleh
Pemborong dan semua hal - hal yang tidak tercantum di BQ ini dianggap sudah
dimasukan dalam harga penawaran pekerjaan yang diajukan /ditawarkan

V Pemborong sudah harus memperhitungkan / mempertimbangkan semua


kemungkinan - kemungkinan yang terjadi di lapangan dalam pelaksanaan
berhubung adanya Pemborong untuk pekerjaan yang lain pada pelaksanan
proyek tersebut.

VI Seluruh pekerjaan yang tertuang dalam BQ ini merupakan pekerjaan


pengadaan dan pemasangan, kecuali bila disebutkan lain.

VII Harga satuan yang ditawarkan harus sudah memperhitungkan "waste" dari
material yang digunakan.

VIII Harga satuan kabel instalasi final pertitik sudah termasuk pipa konduit,
klemp, T dus, inbouw dus, dan bobokan / chipping.

IX Harga satuan kabel Toefoor / Feeder atau pipa konduit yang dipasang di
dalam tanah sudah termasuk biaya galian, penimbunan dan perapihan
kembali sepanjang jalur galian dengan ukuran kedalaman dan lebar yang
sudah ditentukan di dalam Gambar dan Spesifikasi.

X Harga satuan panel daya sudah harus termasuk rumah panel yang terbuat
dari plat besi yang diproses anti karat, cat bakar, kunci, engsel, cover,
support pondasi, sistem pentanahan dan material / bahan pendukung lainnya.

XI Harga satuan Transformator sudah harus termasuk Grounding / sistem pentanahan

XII Harga satuan kabel tray dan kabel ladder sudah harus termasuk semua
aksesoris, support, fitting penyambungan, penggantung, material / bahan
pendukung lainnya.

XIII Harga satuan armatur lampu harus sudah termasuk "marking" dan pelubangan
untuk dudukan armatur, berikut fitting, stater, ballast, trafo dan semua aksesoris
serta komponen lain yang diperlukan.

4.1 / 2
DAFTAR NO. 4 PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
GEDUNG PERTEMUAN GEREJA OSZA - SOLO - JAWA TENGAH

DAFTAR NO. 4.1 PEKERJAAN ELEKTRIKAL

No. Uraian Pekerjaan Unit Qty Harga Satuan Total Harga

4.1 / 3
DAFTAR NO. 4 PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
GEDUNG PERTEMUAN GEREJA OSZA - SOLO - JAWA TENGAH

DAFTAR NO. 4.1 PEKERJAAN ELEKTRIKAL

No. Uraian Pekerjaan Unit Qty Harga Satuan Total Harga

Gedung A
A Pengadaan dan Pemasangan Panel dan Kabel Feeder Elektrikal lengkap dengan
material bantu sesuai gambar dan spesifikasi teknis
- Panel Utama Gedung A Unit 1 1,500,000 1,500,000
- PL I GD A Unit 1 950,000 950,000
- PL II GD A Unit 1 950,000 950,000
- PL II GD A (Provisional) Unit 1 950,000 950,000
- PL LPT Unit 1 950,000 950,000
- NYY 4 x 70 mm2 dari KWH PLN ke Panel Utama Gedung A (Provisional) m 15 35,500 532,500
- NYY 4 x 35 mm2 dari Panel Utama Gedung A ke PL I GD A (Provisional) m 10 25,000 250,000
- NYY 4 x 16 mm2 dari Panel Utama Gedung A ke PL II GD A (Provisional) m 20 20,000 400,000
- NYY 4 x 16 mm2 dari Panel Utama Gedung A ke PL II GD A (Provisional) m 20 20,000 400,000
- NYY 4 x 10 mm2 dari Panel Utama Gedung A ke PL LPT (Provisional) m 20 15,000 300,000
- NYY 4 x 6 mm2 dari Panel Utama Gedung A ke PC-Lift (Provisional) m 30 10,000 300,000
- NYY 3 x 4 mm2 dari Panel Utama Gedung A ke Jet Pump (Provisional) m 20 7,500 150,000

Pengadaan dan Pemasangan Armature Elektrikal dan instalasinya lengkap dengan


material bantu sesuai gambar dan spesifikasi teknis
B Lantai - Bawah
- Downlight LED 7 W Bh 27 30,000 810,000
- Downlight LED 9 W Bh 11 30,000 330,000
- Lampu Dinding 7 W (Provisional) Bh 19 60,000 1,140,000
- TS = (1,2 x 0,6) Bh 16 55,000 880,000
- TS = (0,6 x 0,6) Bh 14 50,000 700,000
- Stop Kontak 200 W Bh 38 35,000 1,330,000
- Saklar Tunggal Bh 8 35,000 280,000
- Saklar Ganda Bh 18 35,000 630,000

- NYM 3 x 2,5 mm + PVC Conduit dia. 20 mm untuk lampu Ttk 87 80,000 6,960,000
- NYM 3 x 2,5 mm + PVC Conduit dia. 20 mm untuk Stop Kontak Ttk 38 95,000 3,610,000

C Site Plan
- Street Lighting Son-T 1 X 250 W (Provisional) c/w pondasi Bh 10 1,000,000 10,000,000

- Kabel NYFGbY 4 x 4 mm² Instalasi Street Lighting (Provisional) Ttk 10 150,000 1,500,000

D Lantai - Atas
- Downlight LED 7 W Bh 12 30,000 360,000
- Downlight LED 9 W Bh 12 30,000 360,000
- TS = (1,2 x 0,6) Bh 22 55,000 1,210,000
- TS = (0,6 x 0,6) Bh 23 50,000 1,150,000
- Stop Kontak 200 W Bh 22 35,000 770,000
- Saklar Tunggal Bh 5 35,000 175,000
- Saklar Ganda Bh 12 35,000 420,000

- NYM 3 x 2,5 mm + PVC Conduit dia. 20 mm untuk lampu Ttk 69 80,000 5,520,000
- NYM 3 x 2,5 mm + PVC Conduit dia. 20 mm untuk Stop Kontak Ttk 22 95,000 2,090,000

Ke Penjumlahan 47,857,500
Elektrikal Gedung A

4.1 / 4
DAFTAR NO. 4 PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
GEDUNG PERTEMUAN GEREJA OSZA - SOLO - JAWA TENGAH

DAFTAR NO. 4.1 PEKERJAAN ELEKTRIKAL

No. Uraian Pekerjaan Unit Qty Harga Satuan Total Harga

4.1 / 5
DAFTAR NO. 4 PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
GEDUNG PERTEMUAN GEREJA OSZA - SOLO - JAWA TENGAH

DAFTAR NO. 4.1 PEKERJAAN ELEKTRIKAL

No. Uraian Pekerjaan Unit Qty Harga Satuan Total Harga

Gedung B
A Pengadaan dan Pemasangan Panel dan Kabel Feeder Elektrikal lengkap dengan
material bantu sesuai gambar dan spesifikasi teknis
- Panel Utama Gedung B Unit 1 1,500,000 1,500,000
- PL I GD B Unit 1 950,000 950,000
- PL II GD B Unit 1 950,000 950,000
- NYY 4 x 70 mm2 dari KWH PLN ke Panel Utama Gedung B m 25 35,500 887,500
- NYY 4 x 16 mm2 dari Panel Utama Gedung B ke PL I GD B m 10 20,000 200,000
- NYY 4 x 35 mm2 dari Panel Utama Gedung B ke PL II GD B m 20 25,000 500,000
- NYY 4 x 6 mm2 dari Panel Utama Gedung B ke PC-Lift (Provisional) m 30 10,000 300,000
- NYY 3 x 4 mm2 dari Panel Utama Gedung B ke Jet Pump (Provisional) m 20 7,500 150,000

Pengadaan dan Pemasangan Armature Elektrikal dan instalasinya lengkap dengan


material bantu sesuai gambar dan spesifikasi teknis
B Lantai - Bawah
- Lampu TB 2 x 36 W tipe TKI Bh 12 40,000 480,000
- Stop Kontak 200 W Bh 6 35,000 210,000
- Saklar Ganda Bh 1 35,000 35,000

- NYM 3 x 2,5 mm + PVC Conduit dia. 20 mm untuk lampu Ttk 12 80,000 960,000
- NYM 3 x 2,5 mm + PVC Conduit dia. 20 mm untuk Stop Kontak Ttk 6 95,000 570,000

C Site Plan
- Street Lighting Son-T 1 X 250 W (Provisional) c/w pondasi Bh 10 1,000,000 10,000,000

- Kabel NYFGbY 4 x 4 mm² Instalasi Street Lighting (Provisional) Ttk 10 150,000 1,500,000

D Lantai - Atas
- Downlight LED 12 W Bh 50 40,000 2,000,000
- Downlight LED 9 W Bh 9 30,000 270,000
- TL 3 x 10 W Bh 24 40,000 960,000
- TL 3 x 36 W Bh 12 40,000 480,000
- TS = (1,2 x 0,6) Bh 8 55,000 440,000
- Stop Kontak 200 W Bh 35 35,000 1,225,000
- Saklar Tunggal Bh 4 35,000 140,000
- Saklar Ganda Bh 13 35,000 455,000

- NYM 3 x 2,5 mm + PVC Conduit dia. 20 mm untuk lampu Ttk 103 80,000 8,240,000
- NYM 3 x 2,5 mm + PVC Conduit dia. 20 mm untuk Stop Kontak Ttk 35 95,000 3,325,000

Ke Penjumlahan 36,727,500
Elektrikal Gedung B

4.1 / 6
DAFTAR NO. 4 PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
GEDUNG PERTEMUAN GEREJA OSZA - SOLO - JAWA TENGAH

DAFTAR NO. 4.1 PEKERJAAN ELEKTRIKAL

No. Uraian Pekerjaan Unit Qty Harga Satuan Total Harga

4.1 / 7
DAFTAR NO. 4 PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
GEDUNG PERTEMUAN GEREJA OSZA - SOLO - JAWA TENGAH

DAFTAR NO. 4.2 PEKERJAAN TELEPON DAN DATA

No. Uraian Pekerjaan Unit Qty Harga Satuan Total Harga

CATATAN HARGA (PRICING NOTES)

I Harga satuan instalasi kabel ruangan sudah harus termasuk bahan /pipa
pelindung, support, penggantung, klem, cable schoen, isolasi dan
perlengkapan pendukung lainnya.

II Harga satuan kabel luar sudah harus termasuk bahan / pipa pelindung,
support, isolasi, galian, urugan, pemadatan / perapihan, pembuangan tanah
dan bahan pendukung lainnya.

III Harga satuan kabel tray & kabel ladder sudah harus termasuk support, fitting
penyambungan, penggantung dan bahan pendukung lainnya.

IV Harga instalasi Telepon sudah termasuk bobokan, dan perapihan dan bahan
pendukung lainnya.

V Pekerjaan Telepon dan instalasinya meliputi pengadaan dan pemasangan


kecuali disebutkan lain dalam Bill of Quantity.

VI Harga satuan pekerjaan yang ditawarkan harus sesuai gambar dan spesifikasi
kecuali disebutkan lain dalam Bill of Quantity.

4.2 / 8
DAFTAR NO. 4 PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
GEDUNG PERTEMUAN GEREJA OSZA - SOLO - JAWA TENGAH

DAFTAR NO. 4.2 PEKERJAAN TELEPON DAN DATA

No. Uraian Pekerjaan Unit Qty Harga Satuan Total Harga

Pengadaan dan Pemasangan Armature Elektronik dan instalasinya lengkap dengan


material bantu sesuai gambar dan spesifikasi teknis

A Telepon
- MDF c/w Operator, Box Perumtel dan Rectifier ls 1 1,000,000 1,000,000
- PABX Telepon (Provisional) Unit 1 1,000,000 1,000,000
- Surge Aresster (Provisional) Unit 1 750,000 750,000
- IDF Lantai Dasar set 1 600,000 600,000
- IDF Lantai 1 set 1 600,000 600,000
- Battery set 1 250,000 250,000
- Instalasi Kabel ITC 20x2x0,6 mm2 dari MDF ke IDF lt Dasar (Provisional) mtr 15 100,000 1,500,000
- Instalasi Kabel ITC 20x2x0,6 mm2 dari MDF ke IDF lt 1 (Provisional) mtr 25 100,000 2,500,000
- Rak Peralatan dan pengkabelan di ruang Kontrol Ls 1 -

B Data
- MDF Unit 1 1,000,000 1,000,000
- IDF Lantai Dasar set 1 600,000 600,000
- IDF Lantai 1 set 1 600,000 600,000
- Surge Aresster (Provisional) Unit 1 750,000 750,000
- Instalasi Kabel ITC 2 x 2 x 0,6 mm2 dari MDF ke TB lt Dasar (Provisional) mtr 15 100,000 1,500,000
- Instalasi Kabel ITC 2x2x0,6 mm2 dari MDF ke TB lt 1 (Provisional) mtr 25 100,000 2,500,000
- Rak Peralatan dan pengkabelan di ruang Kontrol Ls 1 1,500,000 1,500,000
- Battery set 1 250,000 250,000

Ke Penjumlahan 16,900,000
Telepon & Data Main Equipment

GEDUNG A
A Lantai - Bawah
- Outlet Telepon Bh 8 50,000 400,000
- Outlet Data Bh 10 50,000 500,000
- UTP CAT 6 + PVC conduit dia. 20 mm2 untuk outlet telepon dan data (Provisional Ttk 18 150,000 2,700,000

B Lantai - Atas
- Outlet Telepon Bh 2 50,000 100,000
- Outlet Data Bh 4 50,000 200,000
- UTP CAT 5 + PVC conduit dia. 20 mm2 untuk outlet telepon dan data (Provisional Ttk 6 150,000 900,000

Ke Penjumlahan 4,800,000
Telepon & Data Gedung A

GEDUNG B (Provisional)
A Lantai - Atas
- Outlet Telepon Bh 2 50,000 100,000
- Outlet Data Bh 2 50,000 100,000
- UTP CAT 5 + PVC conduit dia. 20 mm2 untuk outlet telepon dan data (Provisional Ttk 4 150,000 600,000

Ke Penjumlahan 800,000
Telepon & Data Gedung B

4.2 / 9
DAFTAR NO. 4 PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
GEDUNG PERTEMUAN GEREJA OSZA - SOLO - JAWA TENGAH

DAFTAR NO. 4.3 PEKERJAAN FIRE ALARM

No. Uraian Pekerjaan Unit Qty Harga Satuan Total Harga

CATATAN HARGA (PRICING NOTES)

I Harga satuan instalasi kabel ruangan sudah harus termasuk bahan /pipa
pelindung, support, penggantung, klem, cable schoen, isolasi dan
perlengkapan pendukung lainnya.

II Harga satuan kabel luar sudah harus termasuk bahan / pipa pelindung,
support, isolasi, galian, urugan, pemadatan / perapihan, pembuangan tanah
dan bahan pendukung lainnya.

III Harga satuan kabel tray & kabel ladder sudah harus termasuk support, fitting
penyambungan, penggantung dan bahan pendukung lainnya.

IV Harga instalasi Telepon sudah termasuk bobokan, dan perapihan dan bahan
pendukung lainnya.

V Pekerjaan Telepon dan instalasinya meliputi pengadaan dan pemasangan


kecuali disebutkan lain dalam Bill of Quantity.

VI Harga satuan pekerjaan yang ditawarkan harus sesuai gambar dan spesifikasi
kecuali disebutkan lain dalam Bill of Quantity.

4.3 / 10
DAFTAR NO. 4 PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
GEDUNG PERTEMUAN GEREJA OSZA - SOLO - JAWA TENGAH

DAFTAR NO. 4.3 PEKERJAAN FIRE ALARM

No. Uraian Pekerjaan Unit Qty Harga Satuan Total Harga

A Pengadaan dan Pemasangan Armature Fire Alarm dan instalasinya lengkap dengan
material bantu sesuai gambar dan spesifikasi teknis

- MCFA ls 1 900,000 900,000


- Battery Unit 1 500,000 500,000
- Surge Aresster (Provisional) Unit 1 500,000 500,000
- Boster set 1 Include #VALUE!
- TB Lantai 1 set 1 250,000 250,000
- TB Lantai 2 set 1 250,000 250,000
- Instalasi Kabel NYA 2x1,5 mm2 dari MCFA ke TB lt 1 (Provisional) mtr 15 15,000 225,000
- Instalasi Kabel NYA 2x1,5 mm2 dari MCFA ke TB lt 2 (Provisional) mtr 25 15,000 375,000
- Rak Peralatan dan pengkabelan di ruang Kontrol Unit 1 500,000 500,000

Ke Penjumlahan #VALUE!
Fire Alarm Main Equipment

GEDUNG A
A Lantai - Bawah
- Smoke Detector (Photoelectric) Bh 15 50,000 750,000
- Combined temperature smoke heat detector - conventional Bh 2 80,000 160,000
- Manual Alarm Push Button Bh 1 50,000 50,000
- Alarm Bell Bh 1 - -
- Alarm Indicator lamp Bh 1 - -
- Fire Intercom Jack Bh 1 - -
- EOL Bh 1 Include #VALUE!
- Instalasi Detector NYA 2x1,5 mm2 + PVC conduit dia. 20 mm2 Ttk 17 - -
- Instalasi ITC 4 x 0.6 mm2 + Pipa Hi Conduit dia 20 mm untuk Fire Ttk 1 -
Intercom Jack
- Instalasi Manual Push Button, Alarm Bell, Alarm Indicator Lamp Ttk 1 -
NYA 2x1,5 mm2 + PVC conduit dia. 20 mm2

B Lantai - Atas
- Combined temperature smoke heat detector - conventional Bh 12 80,000 960,000
- Manual Alarm Push Button Bh 1 50,000 50,000
- Alarm Bell Bh 1 - -
- Alarm Indicator lamp Bh 1 - -
- Fire Intercom Jack Bh 1 - -
- EOL Bh 1 Include #VALUE!
- Instalasi Detector NYA 2x1,5 mm2 + PVC conduit dia. 20 mm2 Ttk 12 - -
- Instalasi ITC 4 x 0.6 mm2 + Pipa Hi Conduit dia 20 mm untuk Fire Ttk 1 - -
Intercom Jack
- Instalasi Manual Push Button, Alarm Bell, Alarm Indicator Lamp Ttk 1 - -
NYA 2x1,5 mm2 + PVC conduit dia. 20 mm2

4.3 / 11
DAFTAR NO. 4 PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
GEDUNG PERTEMUAN GEREJA OSZA - SOLO - JAWA TENGAH

DAFTAR NO. 4.3 PEKERJAAN FIRE ALARM

No. Uraian Pekerjaan Unit Qty Harga Satuan Total Harga

Ke Penjumlahan #VALUE!
Fire Alarm Gedung A

GEDUNG B
A Lantai - Bawah
- Combined temperature smoke heat detector - conventional Bh 10 80,000 800,000
- Manual Alarm Push Button Bh 1 50,000 50,000
- Alarm Bell Bh 1 - -
- Alarm Indicator lamp Bh 1 - -
- Fire Intercom Jack Bh 1 - -
- EOL Bh 1 Include #VALUE!
- Instalasi Detector NYA 2x1,5 mm2 + PVC conduit dia. 20 mm2 Ttk 10 - -
- Instalasi ITC 4 x 0.6 mm2 + Pipa Hi Conduit dia 20 mm untuk Fire Ttk 1 - -
Intercom Jack
- Instalasi Manual Push Button, Alarm Bell, Alarm Indicator Lamp Ttk 1 - -
NYA 2x1,5 mm2 + PVC conduit dia. 20 mm2

B Lantai - Atas
- Combined temperature smoke heat detector - conventional Bh 1 80,000 80,000
- Smoke detector (Photoelectric) (Provisional) Bh 9 50,000 450,000
- Manual Alarm Push Button Bh 1 50,000 50,000
- Alarm Bell Bh 1 - -
- Alarm Indicator lamp Bh 1 - -
- Fire Intercom Jack Bh 1 - -
- EOL Bh 1 Include #VALUE!
- Instalasi Detector NYA 2x1,5 mm2 + PVC conduit dia. 20 mm2 Ttk 10 - -
- Instalasi ITC 4 x 0.6 mm2 + Pipa Hi Conduit dia 20 mm untuk Fire Ttk 1 - -
Intercom Jack
- Instalasi Manual Push Button, Alarm Bell, Alarm Indicator Lamp Ttk 1 - -
NYA 2x1,5 mm2 + PVC conduit dia. 20 mm2

4.3 / 12
DAFTAR NO. 4 PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
GEDUNG PERTEMUAN GEREJA OSZA - SOLO - JAWA TENGAH

DAFTAR NO. 4.3 PEKERJAAN FIRE ALARM

No. Uraian Pekerjaan Unit Qty Harga Satuan Total Harga

Ke Penjumlahan #VALUE!
Fire Alarm Gedung B

4.3 / 13
DAFTAR NO. 4 PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
GEDUNG PERTEMUAN GEREJA OSZA - SOLO - JAWA TENGAH

DAFTAR NO. 4.4 PEKERJAAN TATA SUARA

No. Uraian Pekerjaan Unit Qty Harga Satuan Total Harga

CATATAN HARGA (PRICING NOTES)

I Harga satuan instalasi kabel ruangan sudah harus termasuk bahan /pipa
pelindung, support, penggantung, klem, cable schoen, isolasi dan
perlengkapan pendukung lainnya.

II Harga satuan kabel luar sudah harus termasuk bahan / pipa pelindung,
support, isolasi, galian, urugan, pemadatan / perapihan, pembuangan tanah
dan bahan pendukung lainnya.

III Harga satuan kabel tray & kabel ladder sudah harus termasuk support, fitting
penyambungan, penggantung dan bahan pendukung lainnya.

IV Harga instalasi Telepon sudah termasuk bobokan, dan perapihan dan bahan
pendukung lainnya.

V Pekerjaan Telepon dan instalasinya meliputi pengadaan dan pemasangan


kecuali disebutkan lain dalam Bill of Quantity.

VI Harga satuan pekerjaan yang ditawarkan harus sesuai gambar dan spesifikasi
kecuali disebutkan lain dalam Bill of Quantity.

4.4 / 14
DAFTAR NO. 4 PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
GEDUNG PERTEMUAN GEREJA OSZA - SOLO - JAWA TENGAH

DAFTAR NO. 4.4 PEKERJAAN TATA SUARA

No. Uraian Pekerjaan Unit Qty Harga Satuan Total Harga

A Pengadaan dan Pemasangan Armature Fire Alarm dan instalasinya lengkap dengan
material bantu sesuai gambar dan spesifikasi teknis

- Mic (Provisional) set 3 -


- DVD Unit 1 -
- Miler Per set 1 Exclude #VALUE!
- Speaker Selector Unit 1 -
- Tape Deck Unit 1 -
- Surge Aresster (Provisional) Unit 1 -
- TB Lantai 1 set 1 -
- TB Lantai 2 set 1 -
- Instalasi Kabel NYMHY 2x1,5 mm2 dari Speaker Selector ke TB lt 1 (Provisi mtr 15 -
- Instalasi Kabel NYMHY 2x1,5 mm2 dari Speaker Selector ke TB lt 2 (Provisi mtr 25 -
- Rak Peralatan dan pengkabelan di ruang Kontrol Unit 1 -

Ke Penjumlahan #VALUE!
Tata Suara Main Equipment

GEDUNG A
A Lantai - Bawah
- Speaker Bh 3 -
- Volume Control Bh 2 -
- Selector (Local/oter flow) Bh 2 -
- Microphone Jack Bh 2 include
- Instalasi Speaker, Volume Control, Selecctor, Microphone NYMHY 2x1,5 m Ttk 9 -
PVC conduit dia. 20 mm2

B Lantai - Atas
- Speaker Bh 6 -
- Volume Control Bh 3 -
- Selector (Local/oter flow) Bh 2 -
- Microphone Jack Bh 2 include #VALUE!
- Instalasi Speaker, Volume Control, Selecctor, Microphone NYMHY 2x1,5 m Ttk 13 -
PVC conduit dia. 20 mm2

Ke Penjumlahan #VALUE!
Tata Suara Gedung A

GEDUNG B

B Lantai - Atas
- Speaker Bh 33 -
- Volume Control Bh 3 -
- Selector (Local/oter flow) Provisional Bh 1 -
- Microphone Jack Bh 5 include #VALUE!
- Control Pedestal Bh 1 Exclude
- Instalasi Speaker, Volume Control, Selecctor, Microphone NYMHY 2x1,5 m Ttk 42 -
PVC conduit dia. 20 mm2

Ke Penjumlahan #VALUE!

4.4 / 15
DAFTAR NO. 4 PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
GEDUNG PERTEMUAN GEREJA OSZA - SOLO - JAWA TENGAH

DAFTAR NO. 4.4 PEKERJAAN TATA SUARA

No. Uraian Pekerjaan Unit Qty Harga Satuan Total Harga

Tata Suara Gedung B

4.4 / 16
DAFTAR NO. 4 PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
GEDUNG PERTEMUAN GEREJA OSZA - SOLO - JAWA TENGAH

DAFTAR NO. 4.5 PEKERJAAN PLUMBING

No. Uraian Pekerjaan Unit Qty Harga Satuan Total Harga

Catatan Harga

I Pemborong wajib menghitung kembali volume (jumlah satuan)


pekerjaan yang diajukan Quantity Surveyor dan jika menurut
perhitungan Pemborong volume (jumlah satuan) pekerjaan yang
tercantum tersebut tidak benar atau ada pekerjaan yang belum di
cantumkan, Pemborong dapat merubah atau menambahkannya pada
lampiran yang khusus dibuat untuk itu.

II Semua resiko baik mengenai salah hitung terhadap harga maupun


jumlah satuan yang diajukan dan biaya - biaya lain yang tak terduga
adalah tetap menjadi tanggung jawab Pemborong.

III Dalam memberikan harga pekerjaan ini Pemborong harus sudah


mempertimbangkan untuk memasukan semua biaya pengeluaran
pekerjaan dan tidak ada tuntutan dikemudian hari terhadap Pemberi
Tugas bila Daftar Uraian Pekerjaan / BQ ini dipandang tidak lengkap
oleh Pemborong dan semua hal - hal yang tidak tercantum disini
dianggap sudah dimasukan dalam penawaran pekerjaan yang
ditawarkan.

IV Pemborong sudah harus memperhitungkan / mempertimbangkan


semua kemungkinan - kemungkinan yang terjadi dilapangan dalam
pelaksanaan berhubung adanya Pemborong - Pemborong lain untuk
pelaksanan proyek tersebut.

V Harga satuan pipa yang mempunyai diameter lebih kecil dari 60 mm


sudah mencakup fitting - fittingnya. Harga satuan pipa untuk semua
diameter sudah termasuk penggantung, support / peralatan penunjang
socket / flange dan alat bantu lain dan untuk pipa pekerjaan luar harus
sudah termasuk isolasi dan bahan pelindung yang diperlukan.

VI Harga satuan yang ditawarkan pemborong harus sudah


memperhitungkan "waste" dari bahan yang digunakan.

VII Pekerjaan Pemadam Kebakaran dan Instalasinya meliputi Pengadaan


dan Pemasangan kecuali disebutkan lain dalam Bill Of Quantity.

VIII Catatan harga di atas berlaku untuk seluruh Pekerjaan Plumbing


Seluruh pekerjaan di bawah ini harus sesuai dengan gambar dan yang
diuraikan dalam Spesifikasi.

IX Pipa yang sudah terpasang secara perbagian atau secara keseluruhan


harus ditest sesuai yang dianjurkan didalam spesifikasi dan dibuatkan
berita acara yang disetujui oleh pengawas lapangan atau pihak yang
terkait, ini merupakan dasar progrss material yang sudah terpasang.

Main Equipment

Pengadaan dan Pemasangan Peralatan Utama Lengkap dengan material bantu


Sesuai gambar dan Spesifikasi
A Jet Pump (Provisional) Unit 1 250,000 250,000
Kapasitas : 24 L/menit
Head : 30 M
Power : 1 kW
Termasuk upah pengeboran, pipa casing, inst. Pipa dia. 40 mm dan valve - valvenya

B Tangki Atap - 1 & 2 Kapasitas 2 x 1.000 ltr (Provisional) Unit 2 250,000 500,000
Lengkap dengan Valve, Over Flow, WLC dan pondasi untuk Tangki Atap

C Biotech - Cap 1 M3 (Provisional) Bh 1 2,750,000 2,750,000


Lengkap dengan Exhaust pipe, outflow pipe dia. 100 mm ke saluran serta material
pendukung lainnya sesuai gambar dan spesifikasi teknis

4.5 / 17
DAFTAR NO. 4 PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
GEDUNG PERTEMUAN GEREJA OSZA - SOLO - JAWA TENGAH

DAFTAR NO. 4.5 PEKERJAAN PLUMBING

No. Uraian Pekerjaan Unit Qty Harga Satuan Total Harga

Ke Penjumlahan 3,500,000
Plumbing Main Equipment

Gedung A
Site Plan
A Pengadaan & Pemasangan Instalasi Pipa Air Drainase dari bahan PVC Class AW
lengkap dengan material bantu sesuai spesifikasi & gambar (Provisional)
- Pipa diameter 100 mm m 50 40,000 2,000,000
- Fitting diameter 100 mm Bh 17 4,000 68,000
- Bak Kontrol bh 5 250,000 1,250,000

B Pengadaan & Pemasangan Instalasi Pipa Air bersih dari bahan PPR PN 10
lengkap dengan material bantu sesuai spesifikasi & gambar (Provisional)
- Pipa diameter 25 mm Ke PDAM m 50 25,000 1,250,000
- Pipa diameter 25 mm m 25 25,000 625,000
- Pipa diameter 15 mm m 15 12,500 187,500
- Kran Taman bh 5 50,000 250,000

Lantai - 1
C Pengadaan & Pemasangan Instalasi Pipa Air bersih dari bahan PPR PN 10
lengkap dengan material bantu sesuai spesifikasi & gambar
- Pipa diameter 32 mm ke Existing (Provisional) m 20 35,500 710,000
- Pipa diameter 25 mm m 20 25,000 500,000
- Pipa diameter 20 mm m 41 19,000 779,000
- Gate Valve dia. 32 mm (Provisional) Bh 2 30,000 60,000

D Pengadaan & Pemasangan Instalasi Pipa Air bekas dari bahan PVC Class AW,
10 Kg/cm2 lengkap dengan material bantu sesuai spesifikasi & gambar
- Pipa diameter 80 mm ke Resapan (Provisional) m 20 30,000 600,000
- Pipa diameter 65 mm m 22 25,000 550,000
- Pipa diameter 50 mm m 35 20,000 700,000
- Fitting diameter 80 mm (Provisional) Bh 8 11,000 88,000
- Fitting diameter 65 mm Bh 15 9,000 135,000
- Floor Drain 50 mm Bh 7 By Sipil
- Floor Clean Out 80 mm (Provisional) Bh 1 30,000 30,000
- Floor Clean Out 50 mm (Provisional) Bh 1 25,000 25,000

E Pengadaan & Pemasangan Instalasi Pipa Air Kotor dari bahan PVC Class AW,
10 Kg/cm2 lengkap dengan material bantu sesuai spesifikasi & gambar
- Pipa diameter 130 mm (Provisional) m 20 50,000 1,000,000
- Pipa diameter 100 mm m 16 40,000 640,000
- Fitting diameter 130 mm (Provisional) Bh 8 6,000 48,000
- Fitting diameter 100 mm Bh 12 4,000 48,000
- Floor Clean Out 150 mm (Provisional) Bh 1 35,000 35,000
- Floor Clean Out 100 mm (Provisional) Bh 3 30,000 90,000

F Pengadaan, pemasangan dan pengetesan instalasi pipa air vent dari


bahan PVC Class D sesuai gambar dan spesifikasi (Provisional)
- Pipa diameter 32 mm m 35 35,000 1,225,000
- Vent Cup dia. 32 mm Bh 1 15,000 15,000
Ke Sub Total 1 12,908,500

Lantai - 2
A Pengadaan & Pemasangan Instalasi Pipa Air bersih dari bahan PPR PN 10
lengkap dengan material bantu sesuai spesifikasi & gambar
- Pipa diameter 40 mm m 3 37,500 112,500
- Pipa diameter 25 mm Ke Kitchen (Provisional) m 20 25,000 500,000
- Pipa diameter 25 mm m 26 25,000 650,000
- Pipa diameter 20 mm m 36 19,000 684,000
- Gate Valve dia. 40 mm (Provisional) Bh 1 35,000 35,000

B Pengadaan & Pemasangan Instalasi Pipa Air bekas dari bahan PVC Class AW,
10 Kg/cm2 lengkap dengan material bantu sesuai spesifikasi & gambar
- Pipa diameter 80 mm ke Kitchen (Provisional) m 20 30,000 600,000
- Pipa diameter 80 mm m 5 30,000 150,000
- Pipa diameter 65 mm m 35 25,000 875,000
- Fitting diameter 80 mm (Provisional) Bh 8 11,000 88,000
- Fitting diameter 65 mm Bh 38 9,000 342,000
- Floor Drain 50 mm Bh 10 By Sipil

4.5 / 18
DAFTAR NO. 4 PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
GEDUNG PERTEMUAN GEREJA OSZA - SOLO - JAWA TENGAH

DAFTAR NO. 4.5 PEKERJAAN PLUMBING

No. Uraian Pekerjaan Unit Qty Harga Satuan Total Harga

- Floor Clean Out 80 mm (Provisional) Bh 3 30,000 90,000

4.5 / 19
DAFTAR NO. 4 PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
GEDUNG PERTEMUAN GEREJA OSZA - SOLO - JAWA TENGAH

DAFTAR NO. 4.5 PEKERJAAN PLUMBING

No. Uraian Pekerjaan Unit Qty Harga Satuan Total Harga

C Pengadaan & Pemasangan Instalasi Pipa Air Kotor dari bahan PVC Class AW,
10 Kg/cm2 lengkap dengan material bantu sesuai spesifikasi & gambar
- Pipa diameter 130 mm (Provisional) m 5 50,000 250,000
- Pipa diameter 100 mm m 41 40,000 1,640,000
- Fitting diameter 130 mm (Provisional) Bh 6 6,000 36,000
- Fitting diameter 100 mm Bh 14 4,000 56,000

D Pengadaan, pemasangan dan pengetesan instalasi pipa air vent dari


bahan PVC Class D sesuai gambar dan spesifikasi (Provisional)
- Pipa diameter 32 mm m 24 35,000 840,000
- Vent Cup dia. 32 mm Bh 1 15,000 15,000

Lantai - Atap
E Pengadaan & Pemasangan Instalasi Pipa Air Hujan dari bahan PVC Class AW,
10 Kg/cm2 lengkap dengan material bantu sesuai spesifikasi & gambar (Provisional)
- Pipa diameter 100 mm m 15 40,000 600,000
- Fitting diameter 100 mm Bh 10 4,000 40,000
- Roof Drain diameter 80 mm Bh 5 30,000 150,000

Riser (Provisional)
F Pengadaan & Pemasangan Instalasi Pipa Air bersih dari bahan PPR PN 10
lengkap dengan material bantu sesuai spesifikasi & gambar
- Pipa diameter 40 mm m 8 37,500 300,000

G Pengadaan & Pemasangan Instalasi Pipa Air bekas dari bahan PVC Class AW,
10 Kg/cm2 lengkap dengan material bantu sesuai spesifikasi & gambar
- Pipa diameter 80 mm m 8 30,000 240,000

H Pengadaan & Pemasangan Instalasi Pipa Air Kotor dari bahan PVC Class AW,
10 Kg/cm2 lengkap dengan material bantu sesuai spesifikasi & gambar
- Pipa diameter 130 mm m 8 50,000 400,000

Ke Sub Total 2 8,693,500

Penjumlahan Total

Sub Total 1 12,908,500

Sub Total s 8,693,500

Ke Penjumlahan 21,602,000
Plumbing Gedung A

Site Plan
A Pengadaan & Pemasangan Instalasi Pipa Air Drainase dari bahan PVC Class AW
lengkap dengan material bantu sesuai spesifikasi & gambar (Provisional)
- Pipa diameter 100 mm m 50 40,000 2,000,000
- Fitting diameter 100 mm Bh 17 4,000 68,000
- Bak Kontrol bh 5 250,000 1,250,000

B Pengadaan & Pemasangan Instalasi Pipa Air bersih dari bahan PPR PN 10
lengkap dengan material bantu sesuai spesifikasi & gambar (Provisional)
- Pipa diameter 25 mm m 25 25,000 625,000
- Pipa diameter 15 mm m 15 12,500 187,500
- Kran Taman bh 5 50,000 250,000

Lantai - 1
C Pengadaan & Pemasangan Instalasi Pipa Air bersih dari bahan PVC Class AW
lengkap dengan material bantu sesuai spesifikasi & gambar
- Pipa diameter 40 mm ke Existing (Provisional) m 20 37,500 750,000
- Pipa diameter 25 mm m 20 25,000 500,000
- Pipa diameter 20 mm m 28 19,000 532,000
- Gate Valve dia. 40 mm (Provisional) Bh 2 35,000 70,000

4.5 / 20
DAFTAR NO. 4 PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
GEDUNG PERTEMUAN GEREJA OSZA - SOLO - JAWA TENGAH

DAFTAR NO. 4.5 PEKERJAAN PLUMBING

No. Uraian Pekerjaan Unit Qty Harga Satuan Total Harga

D Pengadaan & Pemasangan Instalasi Pipa Air bekas dari bahan PVC Class AW,
10 Kg/cm2 lengkap dengan material bantu sesuai spesifikasi & gambar
- Pipa diameter 80 mm ke Resapan (Provisional) m 20 30,000 600,000
- Pipa diameter 65 mm m 37 25,000 925,000
- Fitting diameter 80 mm (Provisional) Bh 8 11,000 88,000
- Fitting diameter 65 mm Bh 26 9,000 234,000
- Floor Drain 50 mm Bh 5 By Sipil
- Floor Clean Out 80 mm (Provisional) Bh 1 30,000 30,000
- Floor Clean Out 50 mm (Provisional) Bh 1 25,000 25,000

E Pengadaan & Pemasangan Instalasi Pipa Air Kotor dari bahan PVC Class AW,
10 Kg/cm2 lengkap dengan material bantu sesuai spesifikasi & gambar
- Pipa diameter 130 mm (Provisional) m 20 50,000 1,000,000
- Pipa diameter 100 mm m 18 40,000 720,000
- Fitting diameter 130 mm (Provisional) Bh 8 6,000 48,000
- Fitting diameter 100 mm Bh 10 4,000 40,000

Ke Penjumlahan 9,942,500
Plumbing Gedung B

4.5 / 21
DAFTAR NO. 4 PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
GEDUNG PERTEMUAN GEREJA OSZA - SOLO - JAWA TENGAH

DAFTAR NO. 4.6 PEKERJAAN VAC

No. Uraian Pekerjaan Unit Qty Harga Satuan

Catatan Harga

I Harga satuan Ducting sudah termasuk isolasi, support / penggantung


dan peralatan bantu lainya yang diperlukan seperti uraian dalam gambar
dan spesifikasi

II Untuk Pipa dengan diameter lebih kecil dari 65 mm harga satuan sudah
termasuk harga fitting-fiting
Harga satuan pipa sudah termasuk isolasi, support / penggantung dan
III
material bantu lainnya yang diperlukan seperti uraian dalam gambar dan
spesifikasi
IV Harga satuan unit peralatan AC Split / FCU, Fan dan sudah termasuk
hanger, support dan pondasi sesuai gambar dan spesifikasi

V Sleeve pipa / ducting, pelubangan plafon untuk diffuser / grille, serta


perapihan sudah termasuk dalam harga satuan

VI Pengurusan surat - surat keterangan lengkap mengenai izin pemasangan


/ pengoperasian sistim Tata Udara dari pihak yang berwenang dan
keterangan tentang syarat jaminan atas pompa - pompa dan peralatan
utama jika diperlukan
VII Harga satuan pipa refrigeration supply dan return sudah termasuk isolasi,
support / penggantung dan material bantu lainya yang diperlukan seperti
uraian dalam gambar dan spesifikasi

VIII Testing dan commissioning untuk semusa instalasi sistemnya

4.6 / 22
DAFTAR NO. 4 PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
GEDUNG PERTEMUAN GEREJA OSZA - SOLO - JAWA TENGAH

DAFTAR NO. 4.6 PEKERJAAN VAC

No. Uraian Pekerjaan Unit Qty Harga Satuan

Pengadaan & Pemasangan Peralatan utama Unit AC termasuk instalasi


kabel power & kontrol AC, stop kontak AC, pipa refrigerant & pipa drain.

GEDUNG A
Lantai Bawah
A Type : Split Wall Set 10 950,000
Kap.Udara Supply : 262 Cfm
Power (kW/V/Ø/Hz) : 0.9 / 220 / 1 / 50
Cooling Capacity : 9.000 BTUH

B Type : Split Wall Set 3 750,000


Kap.Udara Supply : 175 Cfm
Power (kW/V/Ø/Hz) : 0.6 / 220 / 1 / 50
Cooling Capacity : 6.000 BTUH

Lantai Atas
C Type : Split Wall Set 9 950,000
Kap.Udara Supply : 262 Cfm
Power (kW/V/Ø/Hz) : 0.9 / 220 / 1 / 50
Cooling Capacity : 9.000 BTUH

D Type : Split Wall Set 3 750,000


Kap.Udara Supply : 175 Cfm
Power (kW/V/Ø/Hz) : 0.6 / 220 / 1 / 50
Cooling Capacity : 6.000 BTUH

E Type : Cassete Set 1 1,500,000


Kap.Udara Supply : 491 Cfm
Power (kW/V/Ø/Hz) : 2,9 / 380 / 3 / 50
Cooling Capacity : 27.000 BTUH

Pengadaan & Pemasangan Peralatan utama Unit FAN termasuk instalasi Ducting,
Kabel Power (Provisional)

Lantai Bawah
F Type : Ceiling Fan Set 4 150,000
Kap.Udara Supply : 100 Cfm
Power (W/V/Ø/Hz) : 100 / 220 / 1 / 50
ESP ( Inc. Wg) : 0.15

Lantai Atas
G Type : Ceiling Fan Set 3 150,000
Kap.Udara Supply : 100 Cfm
Power (W/V/Ø/Hz) : 100 / 220 / 1 / 50
ESP ( Inc. Wg) : 0.15

Ke Penjumlahan
VAC Gedung A

4.6 / 23
DAFTAR NO. 4 PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
GEDUNG PERTEMUAN GEREJA OSZA - SOLO - JAWA TENGAH

DAFTAR NO. 4.6 PEKERJAAN VAC

No. Uraian Pekerjaan Unit Qty Harga Satuan

GEDUNG B
Lantai Bawah
A Type : Split Wall Set 17 950,000
Kap.Udara Supply : 262 Cfm
Power (kW/V/Ø/Hz) : 0.9 / 220 / 1 / 50
Cooling Capacity : 9.000 BTUH

Ke Penjumlahan
VAC Gedung B

4.6 / 24
Total Harga

4.6 / 25
Total Harga

9,500,000

2,250,000

8,550,000

2,250,000

1,500,000

600,000

450,000

25,100,000

4.6 / 26
Total Harga

16,150,000

16,150,000

4.6 / 27
DAFTAR NO. 4 PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
GEDUNG PERTEMUAN GEREJA OSZA - SOLO - JAWA TENGAH

DAFTAR NO. 6.PEK.TAMBAH KURANG

No. Uraian Pekerjaan Unit Qty Harga Satuan Total Harga

I PEKERJAAN ELEKTRIKAL
Gedung A
Pengadaan dan Pemasangan Armature Elektrikal dan instalasinya lengkap dengan
material bantu sesuai gambar dan spesifikasi teknis
A Lantai - Bawah
- Stop Kontak AC 1000 W Bh 14 -
- NYM 3 x 2,5 mm + PVC Conduit dia. 20 mm untuk Stop Kontak Ttk 14 -
B Lantai - Atas
- Stop Kontak AC 1000 W Bh 12 -
- NYM 3 x 2,5 mm + PVC Conduit dia. 20 mm untuk Stop Kontak Ttk 12 -

Ke Penjumlahan -
Elektrikal Gedung A

Gedung B
Pengadaan dan Pemasangan Armature Elektrikal dan instalasinya lengkap dengan
material bantu sesuai gambar dan spesifikasi teknis
A Lantai - Bawah
- Lampu Dinding 7 W (Provisional) Bh 16 -

- NYM 3 x 2,5 mm + PVC Conduit dia. 20 mm untuk lampu Ttk 16 -

B Lantai - Atas
- Lampu Spot Light 8 W Bh 24 -
- Stop Kontak AC 1000 W Bh 17 -

- NYM 3 x 2,5 mm + PVC Conduit dia. 20 mm untuk lampu Ttk 24 -


- NYM 3 x 2,5 mm + PVC Conduit dia. 20 mm untuk Stop Kontak Ttk 17 -

Ke Penjumlahan -
Elektrikal Gedung B

PEKERJAAN PENANGKAL PETIR


Pengadaan dan Pemasangan Penangkal Petir dan instalasinya lengkap dengan
material bantu sesuai gambar dan spesifikasi teknis

1 Penangkal Petir radius proteksi 70 meter unit 1 -


Tiang Penangkal Petir Tinggi 5 meter
2. Kabel NYY 1 x 70 mm m 60 -
3. Obstruction light + instalasi unit 1 -
4 test Link Box unit 1 -
5. Material Bantu & Accessories lot 1 -
6 Bak Kontrol, ukuran 300 x 300 x 300 mm dari beton unit 2 -
bertulang,lengkap dengan terminal dari plat tembaga
elektrode pentanahan sesuai dengan gambar
tahanan tanah yang harus dicapai tidak boleh lebih dari
2Ohm, Bak Kontrol harus dibuat sedemikian rupa
sehingga mudah melakukan kontrol tahanan tanah
setiap saat.

Ke Penjumlahan -
Elektrikal Gedung B

4.1 / 28
DAFTAR NO. 4 PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
GEDUNG PERTEMUAN GEREJA OSZA - SOLO - JAWA TENGAH

DAFTAR NO. 6.PEK.TAMBAH KURANG

No. Uraian Pekerjaan Unit Qty Harga Satuan Total Harga

II PEKERJAAN PLUMBING

Main Equipment

Pengadaan dan Pemasangan Peralatan Utama Lengkap dengan material bantu


Sesuai gambar dan Spesifikasi
A Pompa Booster Unit 1 -
Kapasitas :100 Watt

Ke Penjumlahan -
Plumbing Main Equipment

4.1 / 29
DAFTAR NO. 4 PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
GEDUNG PERTEMUAN GEREJA OSZA - SOLO - JAWA TENGAH

DAFTAR NO. 6.PEK.TAMBAH KURANG

No. Uraian Pekerjaan Unit Qty Harga Satuan Total Harga

III PEKERJAAN VAC


Pengadaan & Pemasangan Peralatan utama Unit AC termasuk instalasi
kabel power & kontrol AC, stop kontak AC, pipa refrigerant & pipa drain.

GEDUNG A
A Lantai Bawah

- Type : Cassete Set 2 1,500,000 3,000,000


Kap.Udara Supp: 491 Cfm
Power (kW/V/Ø/: 2,9 / 380 / 3 / 50
Cooling Capacit : 27.000 BTUH

- Type : Split Wall Set 1 750,000 750,000


Kap.Udara Supp: 175 Cfm
Power (kW/V/Ø/: 0.6 / 220 / 1 / 50
Cooling Capacit : 6.000 BTUH

Pengadaan & Pemasangan Peralatan utama Unit FAN termasuk instalasi Ducting,
Kabel Power (Provisional)

Lantai Bawah
- Type : Ceiling Fan Set (1) 150,000 (150,000)
Kap.Udara Supp: 100 Cfm
Power (W/V/Ø/H: 100 / 220 / 1 / 50
ESP ( Inc. Wg) : 0.15

Ke Penjumlahan 3,600,000
VAC Gedung A

TOTAL PEKERJAAN ME . TAMBAH-KURANG Rp. 3,600,000

4.1 / 30