RENCANA ANGGARAN BIAYA - FULL DESAIN
I PEKERJAAN PENDAHULUAN
1 Pek. Bongkar + Buang Komponen Site/Bangunan Lama Ls 1.00 2,500,000.00 2,500,000.00
2,500,000.00
II PEKERJAAN PONDASI
1 Pek. Pengukuran dan Pas. Bouplank M1 8.00 60,841.00 486,728.00
2 Pek. Galian Tanah M3 5.31 69,300.00 367,983.00
3 Pek. Urugan Kembali Galian Tanah M3 1.33 23,100.00 30,665.25
4 Pek. Lantai Kerja Beton Cor K.100 M3 0.73 724,780.26 529,089.59
5 Pas. Pondasi Batu Bata 1 : 4 (Teras dan Dudukan Closed) M2 4.10 140,000.30 574,001.23
1,988,467.07
III PEKERJAAN BETON, DINDING DAN PLESTERAN
A Pekerjaan Beton Bertulang
1 Pek. Sloof Beton 20 x 30 cm
a. Pembesian Kg 190.32 15,094.20 2,872,728.14
b. Cetakan M2 19.89 90,128.50 1,792,655.87
c. Beton K.175 M3 1.99 937,155.41 1,864,939.26
C JUMLAH A+ B #REF!
D DIBULATKAN #REF!
E HPS ###
F SELISIH #REF!
RENCANA ANGGARAN BIAYA
I PEKERJAAN PENDAHULUAN
1 Pek. Bongkar Rangka Atap M2 203.22 8,800.00 1,788,337.76
2 Pek. Bongkar Atap M2 203.22 5,940.00 1,207,127.99
3 Pek. Bongkar Plafond M2 171.97 12,144.00 2,088,403.68
4 Pek. Bongkar Lantai Keramik M2 51.22 18,920.00 969,082.40
V PEKERJAAN PLAFON
1 Pas. Rangka Plafond M2 171.97 96,415.00 16,580,487.55
2 Pas. Plafond Triplek tebal 4 mm M2 171.97 45,845.25 7,884,007.64
3 Pas. Les Profil 5cm M2 321.50 15,200.00 4,886,800.00
VI PEKERJAAN PENGECATAN
1 Pengikisan/pengerokan permukaan cat lama M2 142.15 14,063.50 1,999,070.27
2 Pek. Cat Ulang Dinding Tembok/Beton (Cat Air) M2 142.15 21,564.40 3,065,293.20
3 Pek. Cat Dinding Tembok/Beton (Cat Air) M2 51.14 29,772.60 1,522,630.31
4 Pek. Cat Pintu Kayu Panel (Cat Minyak) M2 34.97 49,911.40 1,745,152.10
5 Pek. Cat Plafon + Les (Cat Air) M2 171.97 29,772.60 5,119,994.02
6 Pek. Cat Lisplank GRC (Cat Minyak) M2 20.84 49,911.40 1,040,353.22
Page 5
HARGA SAT. JUMLAH HARGA
NO URAIAN PEKERJAAN SAT VOLUME (Rp.) (Rp.)
VIII PEKERJAAN PERLENGKAPAN DALAM
1 Pas. Instalasi Penerangan Ttk 16.00 215,000.00 3,440,000.00
2 Pas. Sakelar Tunggal (penggantian outlet) Bh 6.00 50,000.00 300,000.00
3 Pas. Sakelar Ganda (penggantian outlet) Bh 4.00 55,000.00 220,000.00
4 Pas. Instalasi Stop Kontak Ttk 12.00 225,500.00 2,706,000.00
5 Pas. Stop Kontak (penggantian outlet) Bh 12.00 50,000.00 600,000.00
6 Pas. Lampu CFL 18 Watt Bh 16.00 58,000.00 928,000.00
7 Pas. Closet Jongkok Unit 1.00 625,000.00 625,000.00
Page 6
RENCANA ANGGARAN BIAYA
###
TOTAL HARGA
(Rp.)
6,052,951.83
18,375,535.70
2,898,760.13
53,509,516.41
29,351,295.19
14,492,493.13
37,979,654.21
Page 7
TOTAL HARGA
(Rp.)
8,819,000.00
22,479,925.21
Page 8
Actual Chek
KEGIATAN : REHABILITASI RUMAH NEGARA
PEKERJAAN : REHABILITASI RUMAH NEGARA JL. SAWAHAN DALAM NO 4A PADANG
LOKASI : JL. SAWAHAN DALAM NO 4A PADANG
I PEKERJAAN PENDAHULUAN
1 Pek. Bongkar Rangka Atap M2 203.22 5.60 x 7.30 = 40.880
5.98 x 5.65 = 33.787
3.39 x 4.70 = 15.933
8.05 x 5.60 = 45.080
4.35 x 2.75 = 11.963
5.15 x 1.40 = 7.210
4.15 x 2.75 = 11.413
4.21 x 2.75 = 11.578
1/2 x 4.20 x 4.25 = 8.925
1/2 x 3.26 x 4.10 = 6.683
1/2 x 3.54 x 2.11 = 3.735
1/2 x 4.25 x 2.84 = 6.035
203.220 M2
4 Pas. Kaca 5mm (yang pecah) M2 2.88 2.00 x 0.80 x 1.80 = 2.880 M2
V PEKERJAAN PLAFON
1 Pas. Rangka Plafond M2 171.97 = 171.970 M2
VI PEKERJAAN PENGECATAN
1 Pengikisan/pengerokan permukaan cat lama M2 142.15 = 142.146 M2
2 Pek. Cat Ulang Dinding Tembok/Beton (Cat Air) M2 142.15 - Luas Dinding
3.00 x 11.45 x 2.00 = 68.688
3.00 x 5.11 x 2.00 = 30.630
2.80 x 2.00 x 1.20 = 6.720
106.038
- Luas Kozen
1.50 x 3.15 x 3.00 = 14.175
2.05 x 2.60 x 3.00 = 15.990
1.50 x 0.80 x 4.00 = 4.800
34.965
- Luas Dinding Bersih
106.04 - 34.97 = 71.073
2.00 x 71.07 = 142.146 M2
6 Pek. Cat Lisplank GRC (Cat Minyak) M2 20.84 0.30 x 69.48 = 20.844 M2
4 Pek. Timbunan Halaman dengan tanah Dipadatkan M3 9.05 0.2 x 5.8 x 7.80 = 9.05 M3
5 Cor Beton K-175 Lantai Halaman ditaring licin M3 3.11 31.07 x 0.10 = 3.11 M3
7 Mengganti Pagar yang rusak dengan BRC t= 1.2 Meter M2 13.57 11.31 x 1.20 = 13.57 M2
8 Mengganti Pintu Pagar rusak dengan Pintu BRC t= 1.2 Meter M2 4.80 4 x 1.20 = 4.80 M2
ANALISA HARGA SATUAN PEKERJAAN
Page 12
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
Pembongkaran 1 m2 Lantai Keramik
A TENAGA
Pekerja L.01 OH 0.2000 80,000.000
Mandor L.04 OH 0.0100 120,000.000
Jumlah Tenaga Kerja
B BAHAN
Page 13
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
Pembongkaran 1 m2 Plafond dan Rangka (SNI : 28/PRT/M/2016)
A TENAGA
Pekerja L.01 OH 0.1200 80,000.000
Mandor L.02 OH 0.0120 120,000.000
Jumlah Tenaga Kerja
B BAHAN
Page 14
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
Pemasangan 1 buah engsel pintu (SNI : 28/PRT/M/2016)
A TENAGA
Pekerja L.01 OH 0.0150 80,000.000
Tukang kayu L.02 OH 0.1500 100,000.000
Kepala tukang L.03 OH 0.0150 120,000.000
Mandor L.04 OH 0.0008 120,000.000
Jumlah Tenaga Kerja
B BAHAN
Engsel pintu buah 1.0000 22,200.000
Jumlah Harga Bahan
C PERALATAN
Page 15
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
Pemasangan 1 buah Grendel Pintu (SNI : 28/PRT/M/2016)
A TENAGA
Pekerja L.01 OH 0.0150 80,000.000
Tukang kayu L.02 OH 0.1500 100,000.000
Kepala tukang L.03 OH 0.0150 120,000.000
Mandor L.04 OH 0.0080 120,000.000
Jumlah Tenaga Kerja
B BAHAN
Grendel buah 1.0000 28,000.000
Jumlah Harga Bahan
C PERALATAN
Page 16
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
Pemasangan 1 m2 atap Spandek
A TENAGA
Pekerja L.01 OH 0.0200 80,000.000
Tukang kayu L.03 OH 0.0800 100,000.000
Kepala tukang L.11 OH 0.0100 120,000.000
Mandor L.15 OH 0.0060 120,000.000
Jumlah Tenaga Kerja
B BAHAN
Atap Spandek M2 1.1000 60,000.00
Screw Cteks 12-4 x 50 bh 6.0000 1,200.00
Screw Cteks 10 x 16-16 bh 2.0000 750.00
Jumlah Harga Bahan
C PERALATAN
Jumlah Harga Alat
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
Pemasangan 1 M' Bubungan (SNI : 28/PRT/M/2016)
A TENAGA
Pekerja L.01 OH 0.1250 80,000.000
Tukang kayu L.03 OH 0.2500 100,000.000
Kepala tukang L.03 OH 0.0250 120,000.000
Mandor L.04 OH 0.0060 120,000.000
Jumlah Tenaga Kerja
B BAHAN
Seng pelat 3" x 6” lbr 0.4000 71,500.00
Paku biasa ½”-1” Kg 0.0500 750.00
Paku biasa 2”-5” Kg 0.0500 750.00
Jumlah Harga Bahan
C PERALATAN
Page 17
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
Pemasangan 1 m2 Plafond Triplek 4mm (SNI : 2009)
A TENAGA
Pekerja L.01 OH 0.0700 80,000.000
Tukang kayu L.03 OH 0.1000 100,000.000
Kepala tukang L.03 OH 0.0100 120,000.000
Mandor L.04 OH 0.0040 120,000.000
Jumlah Tenaga Kerja
B BAHAN
Plywood Ukuran 120 x 240 x 4 mm Lbr 0.3750 65,000.00
Paku Triplek Kg 0.0300 750.00
Jumlah Harga Bahan
C PERALATAN
Page 18
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) (SNI : 28/PRT/M/2016)
A TENAGA
Pekerja L.01 OH 0.0200 80,000.000
Tukang L.02 OH 0.0630 100,000.000
Kepala tukang L.03 OH 0.0063 120,000.000
Mandor L.04 OH 0.0030 120,000.000
Jumlah Tenaga Kerja
B BAHAN
Plamuur Kg 0.1000 17,500.00
Cat dasar Kg 0.1000 20,000.00
Cat penutup Kg 0.2600 55,000.00
Jumlah Harga Bahan
C PERALATAN
Page 19
(K3) Pemasangan 1 m2 bekisting untuk pondasi (SNI : 28/PRT/M/2016)
A TENAGA
Pekerja L.01 OH 0.5200 80,000.000
Tukang L.02 OH 0.2600 100,000.000
Kepala tukang L.03 OH 0.0260 120,000.000
Mandor L.04 OH 0.0260 120,000.000
Jumlah Tenaga Kerja
B BAHAN
Kayu kelas III m3 0.0400 1,850,000.00
Paku 5 - 10 cm kg 0.3000 18,000.00
Minyak bekisting Liter 0.1000 13,800.00
Jumlah Harga Bahan
C PERALATAN
Page 20
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(K3) Pemasangan 1 m2 bekisting untuk balok (SNI : 28/PRT/M/2016)
A TENAGA
Pekerja L.01 OH 0.6600 80,000.000
Tukang L.02 OH 0.3300 100,000.000
Kepala tukang L.03 OH 0.0330 120,000.000
Mandor L.04 OH 0.0330 120,000.000
Jumlah Tenaga Kerja
B BAHAN
Kayu kelas III m3 0.0400 1,850,000.00
Paku 5 cm - 12 cm kg 0.4000 18,000.00
Minyak bekisting Liter 0.2000 13,800.00
Balok kayu kelas II m3 0.0180 2,500,000.00
Plywood tebal 9 Lbr 0.3500 115,000.00
Dolken kayu dia. 8-10cm -panj 4 m Btg 2.0000 20,000.00
Jumlah Harga Bahan
C PERALATAN
Page 21
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa slump (3-6)
cm, w/c = 0,87 (SNI : 28/PRT/M/2016)
A TENAGA
Pekerja L.01 OH 1.2000 80,000.000
Tukang L.02 OH 0.2000 100,000.000
Kepala tukang L.03 OH 0.0200 120,000.000
Mandor L.04 OH 0.0600 120,000.000
Jumlah Tenaga Kerja
B BAHAN
Semen Portland kg 230.0000 1,202.00
Pasir beton kg 893.0000 96.30
Kerikil (Maks 30mm) kg 1,027.0000 196.30
Air Liter 200.0000 18.00
Jumlah Harga Bahan
C PERALATAN
Page 22
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
Memasang Pipa PVC Tipe AW Diameter 3/4" (SNI 2009)
A TENAGA
Pekerja L.01 OH 0.0360 80,000.000
Tukang L.02 OH 0.0600 100,000.000
Kepala tukang L.03 OH 0.0060 120,000.000
Mandor L.04 OH 0.0018 120,000.000
Jumlah Tenaga Kerja
B BAHAN
Pipa PVC Tipe AW Diameter 3/4" buah 1.2000 9,200.00
Jumlah Harga Bahan
C PERALATAN
Perlengkapan Set 0.3500 11,040.000
Jumlah Harga Alat
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
Memasang Pipa PVC Tipe AW Diameter 3" (SNI 2009)
A TENAGA
Pekerja L.01 OH 0.0810 80,000.000
Tukang L.02 OH 0.1350 100,000.000
Kepala tukang L.03 OH 0.0135 120,000.000
Mandor L.04 OH 0.0041 120,000.000
Jumlah Tenaga Kerja
B BAHAN
Pipa PVC Tipe AW Diameter 3" buah 1.2000 35,200.00
Jumlah Harga Bahan
C PERALATAN
Perlengkapan Set 0.3500 42,240.000
Jumlah Harga Alat
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :4PP (SNI : 28/PRT/M/2016)
A TENAGA
Pekerja L.01 OH 0.3000 80,000.000
Tukang L.02 OH 0.1000 100,000.000
Kepala tukang L.03 OH 0.0100 120,000.000
Mandor L.04 OH 0.1500 120,000.000
Jumlah Tenaga Kerja
B BAHAN
Bata Merah buah 70.0000 1,000.00
Semen kg 11.5000 1,202.00
Pasir Pasang m3 0.0430 150,000.00
Jumlah Harga Bahan
C PERALATAN
Page 23
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
Memasang 1 m2 dinding batu Alam (SNI 7395:2008 No.6.58)
A TENAGA
Pekerja L.01 OH 0.7000 80,000.000
Tukang L.02 OH 0.3500 100,000.000
Kepala tukang L.03 OH 0.0350 120,000.000
Mandor L.04 OH 0.0350 120,000.000
Jumlah Tenaga Kerja
B BAHAN
Batu Alam m2 1.1000 150,000.00
Semen kg 11.7500 1,202.00
Pasir Pasang m3 0.0350 150,000.00
Jumlah Harga Bahan
C PERALATAN
Page 24
ANALISA HARGA SATUAN PEKERJAAN
Jumlah
1,066,720.00
79,920.00
1,146,640.00
1,146,640.00
114,664.00
1,261,304.00
Jumlah
24,000.00
1,200.00
25,200.00
126,000.00
126,000.00
151,200.00
15,120.00
166,320.00
Jumlah
20,000.00
3,000.00
23,000.00
126,000.00
126,000.00
149,000.00
14,900.00
163,900.00
Page 25
Jumlah
16,000.00
1,200.00
17,200.00
17,200.00
1,720.00
18,920.00
Jumlah
8,000.00
2,500.00
300.00
600.00
8,000.00
8,000.00
800.00
8,800.00
Jumlah
400.00
5,000.00
5,400.00
5,400.00
540.00
5,940.00
Page 26
Jumlah
9,600.00
1,440.00
11,040.00
11,040.00
1,104.00
12,144.00
Jumlah
3 kusen pintu dan kusen jendela Kayu Klas I (SNI : 28/PRT/M/2016)
560,000.00
2,100,000.00
252,000.00
42,000.00
2,954,000.00
2,954,000.00
295,400.00
3,249,400.00
Jumlah
80,000.00
300,000.00
36,000.00
6,000.00
422,000.00
100,000.00
7,500.00
107,500.00
529,500.00
52,950.00
582,450.00
Page 27
Jumlah
1,200.00
15,000.00
1,800.00
96.00
18,096.00
22,200.00
22,200.00
40,296.00
4,029.60
44,325.60
Jumlah
1,600.00
20,000.00
2,400.00
120.00
24,120.00
259,200.00
259,200.00
283,320.00
28,332.00
311,652.00
Jumlah
1,200.00
15,000.00
1,800.00
96.00
18,096.00
96,250.00
4,750.00
101,000.00
119,096.00
11,909.60
131,005.60
Page 28
Jumlah
1,200.00
15,000.00
1,800.00
960.00
18,960.00
28,000.00
28,000.00
46,960.00
4,696.00
51,656.00
Jumlah
10,240.00
1,400.00
5,880.00
7,800.00
25,320.00
48,750.00
21,000.00
4,800.00
10,000.00
84,550.00
-
109,870.00
10,987.00
120,857.00
Jumlah
10,240.00
1,400.00
5,880.00
7,800.00
25,320.00
19,250.00
27,300.00
2,400.00
48,950.00
-
74,270.00
7,427.00
81,697.00
Page 29
Jumlah
1,600.00
8,000.00
1,200.00
720.00
11,520.00
66,000.00
7,200.00
1,500.00
74,700.00
-
86,220.00
8,622.00
94,842.00
Jumlah
10,000.00
25,000.00
3,000.00
720.00
38,720.00
28,600.00
37.50
37.50
28,675.00
-
67,395.00
6,739.50
74,134.50
Jumlah
12,000.00
25,000.00
3,000.00
9,000.00
49,000.00
38,500.00
150.00
38,650.00
-
87,650.00
8,765.00
96,415.00
Page 30
Jumlah
5,600.00
10,000.00
1,200.00
480.00
17,280.00
24,375.00
22.50
24,397.50
-
41,677.50
4,167.75
45,845.25
Jumlah
12,000.00
360.00
12,360.00
425.00
425.00
-
12,785.00
1,278.50
14,063.50
Jumlah
2,240.00
4,200.00
504.00
360.00
7,304.00
2,400.00
9,900.00
12,300.00
-
19,604.00
1,960.40
21,564.40
Page 31
Jumlah
lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) (SNI : 28/PRT/M/2016)
1,600.00
6,300.00
756.00
360.00
9,016.00
1,750.00
2,000.00
14,300.00
18,050.00
-
27,066.00
2,706.60
29,772.60
Jumlah
5,600.00
900.00
720.00
360.00
7,580.00
6,000.00
4,500.00
10,200.00
15,600.00
80.00
414.00
1,000.00
37,794.00
-
45,374.00
4,537.40
49,911.40
Jumlah
5,600.00
7,000.00
840.00
480.00
13,920.00
120,750.00
2,550.00
123,300.00
-
137,220.00
13,722.00
150,942.00
15,094.20
Jumlah
Page 32
41,600.00
26,000.00
3,120.00
3,120.00
73,840.00
74,000.00
5,400.00
1,380.00
80,780.00
-
154,620.00
15,462.00
170,082.00
Jumlah
41,600.00
26,000.00
3,120.00
3,120.00
73,840.00
83,250.00
5,400.00
1,380.00
90,030.00
-
163,870.00
16,387.00
180,257.00
Jumlah
52,800.00
33,000.00
3,960.00
3,960.00
93,720.00
74,000.00
7,200.00
2,760.00
37,500.00
40,250.00
40,000.00
201,710.00
-
295,430.00
29,543.00
324,973.00
Page 33
Jumlah
52,800.00
33,000.00
3,960.00
3,960.00
93,720.00
74,000.00
7,200.00
2,760.00
45,000.00
40,250.00
40,000.00
209,210.00
-
302,930.00
30,293.00
333,223.00
Jumlah
52,800.00
33,000.00
3,960.00
3,960.00
93,720.00
74,000.00
7,200.00
2,760.00
37,500.00
40,250.00
120,000.00
281,710.00
-
375,430.00
37,543.00
412,973.00
Page 34
Jumlah
96,000.00
20,000.00
2,400.00
7,200.00
125,600.00
276,460.00
85,992.59
201,596.30
3,600.00
567,648.89
-
693,248.89
69,324.89
762,573.78
Jumlah
132,000.00
27,500.00
3,360.00
9,960.00
172,820.00
391,852.00
73,185.19
201,988.89
3,870.00
670,896.07
-
843,716.07
84,371.61
928,087.68
Jumlah
20,000.00
12,500.00
1,560.00
1,560.00
35,620.00
82,875.00
11,779.60
6,750.00
12,870.00
114,274.60
-
149,894.60
14,989.46
164,884.06
Page 35
Jumlah
2,880.00
6,000.00
720.00
216.00
9,816.00
11,040.00
11,040.00
3,864.00
3,864.00
24,720.00
2,472.00
27,192.00
Jumlah
6,480.00
13,500.00
1,620.00
492.00
22,092.00
42,240.00
42,240.00
14,784.00
14,784.00
79,116.00
7,911.60
87,027.60
Jumlah
erah (5x11x22) cm tebal ½ batu campuran 1SP :4PP (SNI : 28/PRT/M/2016)
24,000.00
10,000.00
1,200.00
18,000.00
53,200.00
70,000.00
13,823.00
6,450.00
70,000.00
-
123,200.00
12,320.00
135,520.00
Page 36
Jumlah
56,000.00
35,000.00
4,200.00
4,200.00
99,400.00
165,000.00
14,123.50
5,250.00
165,000.00
-
264,400.00
26,440.00
290,840.00
Jumlah
24,000.00
18,000.00
1,800.00
1,800.00
45,600.00
7,500.48
3,600.00
11,100.48
-
56,700.48
5,670.05
62,370.53
Jumlah
16,000.00
12,000.00
1,200.00
1,200.00
30,400.00
3,906.50
3,906.50
-
34,306.50
3,430.65
37,737.15
Page 37
ANALISA HARGA SATUAN PEKERJAAN
HARGA JUMLAH
UPAH BAHAN
NO URAIAN SATUAN HARGA
Rp. Rp. Rp. Rp.
1 1 M1 Pengukuran dan Pemasangan Bouplank
Upah :
0.005 OH Mandor 120,000.00 600.00
0.010 OH Kepala Tukang 120,000.00 1,200.00
0.100 OH Tukang 100,000.00 10,000.00
0.100 OH Pekerja 80,000.00 8,000.00
Bahan :
0.012 M3 Kayu Balok Kelas IV ### 22,200.00
0.020 Kg Paku Kayu 18,000.00 360.00
0.007 M3 Kayu Papan Kelas IV ### 12,950.00
Jumlah 19,800.00 35,510.00 55,310.00
Keuntungan & Overhead 10% 5,531.00
Jumlah 60,841.00
6 1 M3 Membuat 1 M3 Beton Mutu Fc = 7,4 MPa (K.100), Slump (12 ± 2 ) cm, w/c = 0,87
Upah :
1.600 OH Pekerja 80,000.00 128,000.00
0.275 OH Tukang 100,000.00 27,500.00
0.028 OH Kepala Tukang 120,000.00 3,360.00
0.083 OH Mandor 120,000.00 9,960.00
Page 38
HARGA JUMLAH
UPAH BAHAN
NO URAIAN SATUAN HARGA
Rp. Rp. Rp. Rp.
Bahan :
247.000 Kg Semen Portland (50 Kg) 1,202.00 296,894.00
869.000 Kg Pasir Beton 107.14 93,107.14
999.000 Kg Kerikil Beton 96.30 96,200.00
215.000 Ltr Air 18.00 3,870.00
Jumlah 168,820.00 490,071.14 658,891.14
Keuntungan & Overhead 10% 65,889.11
Jumlah 724,780.26
7 1 M3 Membuat Beton Mutu FC = 14,5 MPa (K.175), Slump (12 ± 2) cm, W/C = 0,66
Upah :
1.650 OH Pekerja 80,000.00 132,000.00
0.275 OH Tukang 100,000.00 27,500.00
0.028 OH Kepala Tukang 120,000.00 3,360.00
0.083 OH Mandor 120,000.00 9,960.00
Bahan :
326.000 Kg Semen Portland (50 Kg) 1,202.00 391,852.00
760.000 Kg Pasir Beton 107.14 81,428.57
### Kg Kerikil Split 0,5 - 1 cm 196.30 201,988.89
215.000 Ltr Air 18.00 3,870.00
Jumlah 172,820.00 679,139.46 851,959.46
Keuntungan & Overhead 10% 85,195.95
Jumlah 937,155.41
Page 39
HARGA JUMLAH
UPAH BAHAN
NO URAIAN SATUAN HARGA
Rp. Rp. Rp. Rp.
0.015 M3 Kayu Balok Kelas IV ### 27,750.00
2.000 Btg Dolken Kayu Galam Ø8 - 10 cm Panjang 3 m 20,000.00 40,000.00
Jumlah 93,720.00 151,710.00 245,430.00
Keuntungan & Overhead 10% 24,543.00
Jumlah 269,973.00
Untuk 2 x Pemakaian = 1/2 x 134,986.50
14 1 M2 Memasang Acian
Upah :
0.150 OH Pekerja 80,000.00 12,000.00
0.100 OH Tukang 100,000.00 10,000.00
0.010 OH Kepala Tukang 120,000.00 1,200.00
0.008 OH Mandor 120,000.00 960.00
Bahan :
3.250 Kg Semen Portland (50 Kg) 1,202.00 3,906.50
Jumlah 24,160.00 3,906.50 28,066.50
Keuntungan & Overhead 10% 2,806.65
Jumlah 30,873.15
Page 40
HARGA JUMLAH
UPAH BAHAN
NO URAIAN SATUAN HARGA
Rp. Rp. Rp. Rp.
15 1 M2 Afwerking Beton
Upah :
0.640 Oh Pekerja 80,000.00 51,200.00
0.300 Oh Tukang 100,000.00 30,000.00
0.030 Oh Kepala Tukang 120,000.00 3,600.00
0.032 Oh Mandor 120,000.00 3,840.00
Bahan :
0.192 Zak Semen Portland (50 Kg) 60,100.00 11,539.20
0.005 M3 Pasir Pasang 150,000.00 750.00
Jumlah 88,640.00 12,289.20 100,929.20
Keuntungan & Overhead 10% 10,092.92
Jumlah 111,022.12
Page 41
HARGA JUMLAH
UPAH BAHAN
NO URAIAN SATUAN HARGA
Rp. Rp. Rp. Rp.
20 1 M1 Memasang Lisplank GRC Double tebal 10 mm
Upah :
0.100 OH Pekerja 80,000.00 8,000.00
0.050 OH Tukang 100,000.00 5,000.00
0.005 OH Kepala Tukang 120,000.00 600.00
0.005 OH Mandor 120,000.00 600.00
Bahan :
1.000 M1 Lisplank GRC 20x1x244 cm #REF! #REF!
1.000 M1 Lisplank GRC 10x1x244 cm #REF! #REF!
8.000 Bh Paku Sekrup 1,000.00 8,000.00
Jumlah 14,200.00 #REF! #REF!
Keuntungan & Overhead 10% #REF!
Jumlah #REF!
22 1 M2 Membuat Daun Pintu Kayu Kelas II (Rangka Tertutup), Luar Lapis Triplek Jati, Dalam Lapis Formika
Upah :
0.600 Oh Pekerja 80,000.00 48,000.00
2.000 Oh Tukang Kayu 100,000.00 200,000.00
0.200 Oh Kepala Tukang 120,000.00 24,000.00
0.030 Oh Mandor 120,000.00 3,600.00
Bahan :
0.025 M3 Papan Kayu Kelas II ### 62,500.00
0.030 Kg Paku Kayu 18,000.00 540.00
0.500 Kg Lem Kayu 15,000.00 7,500.00
0.500 Lbr Triplek Jati 65,000.00 32,500.00
0.500 Lbr Formika 100,300.00 50,150.00
Jumlah 275,600.00 153,190.00 428,790.00
Keuntungan & Overhead 10% 42,879.00
Jumlah 471,669.00
Page 42
HARGA JUMLAH
UPAH BAHAN
NO URAIAN SATUAN HARGA
Rp. Rp. Rp. Rp.
Bahan :
1.100 M2 Keramik 40 x 40 cm Polis ex. Garuda 75,000.00 82,500.00
10.400 Kg Portland Semen (50 Kg) 1,202.00 12,500.80
0.045 M3 Pasir Pasang 150,000.00 6,750.00
1.300 Kg Semen Warna 9,900.00 12,870.00
Jumlah 98,800.00 114,620.80 213,420.80
Keuntungan & Overhead 10% 21,342.08
Jumlah 234,762.88
Page 43
HARGA JUMLAH
UPAH BAHAN
NO URAIAN SATUAN HARGA
Rp. Rp. Rp. Rp.
Jumlah 14,200.00 80,285.00 94,485.00
Keuntungan & Overhead 10% 9,448.50
Jumlah 103,933.50
29 1 M2 Pengecatan Bidang Kayu/Cat Minyak (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
Upah :
0.070 OH Pekerja 80,000.00 5,600.00
0.009 OH Tukang 100,000.00 900.00
0.006 OH Kepala Tukang 120,000.00 720.00
0.003 OH Mandor 120,000.00 300.00
Bahan :
0.200 Kg Menie Kayu 30,000.00 6,000.00
0.150 Kg Plammer Kayu 30,000.00 4,500.00
0.170 Kg Cat Dasar/Cat Minyak 60,000.00 10,200.00
0.260 Kg Cat Penutup/Cat Minyak 60,000.00 15,600.00
Jumlah 7,520.00 36,300.00 43,820.00
Keuntungan & Overhead 10% 4,382.00
Jumlah 48,202.00
30 1 M2 Pengecatan Bidang Tembok/Beton (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
Upah :
0.020 OH Pekerja 80,000.00 1,600.00
0.063 OH Tukang 100,000.00 6,300.00
0.006 OH Kepala Tukang 120,000.00 756.00
0.003 OH Mandor 120,000.00 300.00
Bahan :
0.100 Kg Plammer Tembok 17,500.00 1,750.00
0.100 Kg Cat Dasar (Dulux Catylac) 55,000.00 5,500.00
0.260 Kg Cat Penutup (Dulux Catylac) 55,000.00 14,300.00
Jumlah 8,956.00 21,550.00 30,506.00
Keuntungan & Overhead 10% 3,050.60
Jumlah 33,556.60
Page 44
HARGA JUMLAH
UPAH BAHAN
NO URAIAN SATUAN HARGA
Rp. Rp. Rp. Rp.
Bahan :
1.100 M1 Pipa PVC dia. 1/2" AW 7,200.00 7,920.00
Perlengkapan = 30% harga pipa 2,160.00
Jumlah 22,092.00 10,080.00 32,172.00
Keuntungan & Overhead 10% 3,217.20
Jumlah 35,389.20
Page 45
HARGA JUMLAH
UPAH BAHAN
NO URAIAN SATUAN HARGA
Rp. Rp. Rp. Rp.
38 1 Buah Memasang Kloset Jongkok Porselin
Upah :
1.000 OH Pekerja 80,000.00 80,000.00
1.500 OH Tukang 100,000.00 150,000.00
1.500 OH Kepala Tukang 120,000.00 180,000.00
0.160 OH Mandor 120,000.00 19,200.00
Bahan :
1.000 Bh Closed Jongkok ex. KIA Type Ex Rapi/Duty/D 412,500.00 412,500.00
6.000 Kg Semen Portland (50 Kg) 1,202.00 7,212.00
0.010 M3 Pasir Pasang 150,000.00 1,500.00
Jumlah 429,200.00 421,212.00 850,412.00
Keuntungan & Overhead 10% 85,041.20
Jumlah 935,453.20
Page 46
HARGA JUMLAH
UPAH BAHAN
NO URAIAN SATUAN HARGA
Rp. Rp. Rp. Rp.
Bahan :
1.000 Bh Kran Air dia. 1/2" 25,000.00 25,000.00
0.025 Bh Seal Tape 5,000.00 125.00
Jumlah 12,600.00 25,125.00 37,725.00
Keuntungan & Overhead 10% 3,772.50
Jumlah 41,497.50
Konsultan Perencana
CV. INTIKARYA TIGAMITRA (INKATIM)
Page 47
HARGA SATUAN UPAH DAN BAHAN
Page 48
NO BAHAN BANGUNAN SATUAN HARGA SATUAN
57 Seal Tape Bh Rp. 5,000.00
58 Floor Drain Stainless Steel Bh Rp. 40,000.00
59 Kaca tebal 5 mm M2 Rp. 87,500.00
60 Sealant Kg Rp. 95,000.00
61 Grendel Bh Rp. 28,000.00
62 Main Truss C 75.75 m' Rp. 13,000.00
63 Reng U Type 0,6 TCT m' Rp. 5,833.33
64 Screw uk 12 x 40 bh Rp. 600.00
65 Screw uk 12 x 20 bh Rp. 500.00
66 L. Plate bh Rp. 5,000.00
67 Dyna Bold bh Rp. 2,300.00
68 Lisplank GRC Double tbl. 8 mm M1 Rp. 19,444.44
69 Kalsiplank uk 300 x 20 x 0,8 cm Lbr Rp. 55,000.00
70 Kalsiplank uk 300 x 30 x 0,8 cm Lbr Rp. 78,000.00
71 Paku Sekrup Kg Rp. 48,000.00
Page 49
JADWAL PELAKSANAAN PEKERJAAN
V PEKERJAAN PLAFON 15.133 1.68 1.68 1.68 1.68 1.68 1.68 1.68 1.68 1.68 ###
VI PEKERJAAN PENGECATAN 7.472 1.07 1.07 1.07 1.07 1.07 1.07 1.07 ###
VII PEKERJAAN LANTAI 19.581 2.80 2.80 2.80 2.80 2.80 2.80 2.80
VIII PEKERJAAN PERLENGKAPAN DALAM 4.547 0.65 0.65 0.65 0.65 0.65 0.65 0.65
IX PEKERJAAN PERLENGKAPAN LUAR 11.590 1.93 1.93 1.93 1.93 1.93 1.93 ###
100.000
1 Bobot Rencana Per Minggu 3.12 4.74 9.30 4.75 4.75 5.81 5.81 5.81 8.61 8.61 9.26 8.13 5.38 5.38 5.38 2.58 2.58
2 Bobot Rencana Komulatif 3.12 7.86 17.15 21.90 26.65 32.46 38.28 44.09 52.70 61.31 70.57 78.70 84.08 89.46 94.84 97.42 100.00
Jangka waktu pelaksanaan pekerjaan pisik = 120 (seratus dua puluh) hari kalender
RENCANA ANGGARAN BIAYA
Kegiatan :
Pekerjaan : Rehab Gedung Kantor Dinas Kebudayaan Dan Pariwisata Provinsi Sumatera Barat
Lokasi : Jln. Khatib Sulaiman No. Padang
I PEKERJAAN PENDAHULUAN
1 Pembuatan Job Mix Formula (JMF) + Laporan Ls 1.00 750,000.00 750,000.00
2 Pek. Bongkar + Buang Komponen Site/Bangunan Lama Ls 1.00 2,500,000.00 2,500,000.00
3,250,000.00
II PEKERJAAN PONDASI
1 Pek. Pengukuran dan Pas. Bouplank M1 8.00 60,841.00 486,728.00
2 Pek. Galian Tanah M3 5.32 69,300.00 368,676.00
3 Pek. Urugan Kembali Galian Tanah M3 1.33 23,100.00 30,723.00
4 Pek. Lantai Kerja Beton Cor K.100 M3 0.82 724,780.26 594,319.81
5 Pas. Pondasi Batu Bata 1 : 4 (Teras dan Dudukan Closed) M2 4.41 140,000.30 617,401.32
2,097,848.13
III PEKERJAAN BETON, DINDING DAN PLESTERAN
A Pekerjaan Beton Bertulang
1 Pek. Sloof Beton 20 x 30 cm
a. Pembesian Kg 201.25 15,094.20 3,037,707.75
b. Cetakan M2 19.32 90,128.50 1,741,282.62
c. Beton K.175 M3 1.93 937,155.41 1,808,709.93