CKIR
Harga Jumlah
No. Uraian Pekerjaan Satuan Volume
Satuan ( Rupiah ) Harga( Rupiah )
1 2 3 4 5 6
1 PEKERJAAN PENDAHULUAN
1 Mobilisasi-Demobilisasi, Pengukuran & Pematokan Ls 1.00 100,000,000.00 100,000,000.00
2 Pelaporan, Gambar (Shop Drawing+Asbuilt Drawing),
Dokumentasi & Administrasi Proyek Ls 1.00 35,000,000.00 35,000,000.00
2.2 P/P Pipa HDPE DIA 350 - 75 mm, IKK Bangun Rejo Kec. Tenggarong Seberang
2.2.1 Pipa HDPE Ø 350 mm, S 8 - SDR 17 (PN 10/PE100)
1 Pengadaan Pipa M' 500.00 1,514,490.00 757,245,000.00
2 Pemasangan Pipa M' 500.00 230,219.55 115,109,775.00
2.3 P/P Pipa HDPE DIA 150 - 75 mm, IKK Loa Janan Kec. Loa Janan
2.3.1 Pipa HDPE Ø 150 mm, S 8 - SDR 17 (PN 10/PE100)
1 Pengadaan Pipa M' 1,200.00 366,760.00 440,112,000.00
2 Pemasangan Pipa M' 1,200.00 119,575.24 143,490,288.00
5,904,816,295.66
590,481,629.57
6,495,297,925.23
6,495,297,000.00
ADENDUM KONTRAK PT. CITRA KARYA INDO RAYA
1 PEKERJAAN PENDAHULUAN
1 Mobilisasi-Demobilisasi, Pengukuran & Pematokan Ls 1.00 100,000,000.00 100,000,000.00 - - - - - - 1.00 100,000,000.00 100,000,000.00
2 Pelaporan, Gambar (Shop Drawing+Asbuilt Drawing),
Dokumentasi & Administrasi Proyek Ls 1.00 35,000,000.00 35,000,000.00 - - - - - - 1.00 35,000,000.00 35,000,000.00
2.2 P/P Pipa HDPE DIA 350 - 75 mm, IKK Bangun Rejo Kec. Tenggarong Seberang
2.2.1 Pipa HDPE Ø 350 mm, S 8 - SDR 17 (PN 10/PE100)
1 Pengadaan Pipa M' 500.00 1,514,490.00 757,245,000.00 330.00 1,514,490.00 499,781,700.00 - - - 830.00 1,514,490.00 1,257,026,700.00 TAMBAH
2 Pemasangan Pipa M' 500.00 230,219.55 115,109,775.00 330.00 230,219.55 75,972,451.50 - - - 830.00 230,219.55 191,082,226.50 TAMBAH
1 Stub Flange HDPE DN 200 mm Bh 1.00 804,400.00 804,400.00 1.00 804,400.00 804,400.00 BARU
2 Flange Spigot DN 150 mm Bh 1.00 870,020.00 870,020.00 1.00 870,020.00 870,020.00 BARU
3 Flange Socet DN 150 mm Bh 1.00 1,256,000.00 1,256,000.00 1.00 1,256,000.00 1,256,000.00 BARU
4 Gate Valve DN 150 Bh 1.00 5,500,000.00 5,500,000.00 1.00 5,500,000.00 5,500,000.00 BARU
5 Gibol Joint DN 150 Bh 1.00 - 1.00 - - BARU
6 Gibol Joint DN 200 Bh 1.00 482,625.00 482,625.00 1.00 482,625.00 482,625.00 BARU
7 Paking DN 150mm Bh 2.00 50,000.00 100,000.00 2.00 50,000.00 100,000.00 BARU
8 Paking DN 200mm Bh 1.00 75,000.00 75,000.00 1.00 75,000.00 75,000.00 BARU
9 Tee PVC DN 200 x 150 mm Bh 1.00 - 1.00 - - BARU
10 Baut 5/8 Bh 36.00 15,000.00 540,000.00 36.00 15,000.00 540,000.00 BARU
2.3 P/P Pipa HDPE DIA 150 - 75 mm, IKK Loa Janan Kec. Loa Janan
2.3.1 Pipa HDPE Ø 150 mm, S 8 - SDR 17 (PN 10/PE100)
1 Pengadaan Pipa M' 1,200.00 366,760.00 440,112,000.00 1,800.00 366,760.00 660,168,000.00 - - - 3,000.00 366,760.00 1,100,280,000.00 TAMBAH
2 Pemasangan Pipa M' 1,200.00 119,575.24 143,490,288.00 1,800.00 119,575.24 215,235,432.00 - - - 3,000.00 119,575.24 358,725,720.00 TAMBAH
2 Pipa Selubung ( GI ) Ø 200 mm M' 12.00 751,779.17 9,021,350.04 33.00 751,779.17 24,808,712.61 - - - 45.00 751,779.17 33,830,062.65 TAMBAH
3 Cor Beton 1 : 2 : 3 M³ 2.57 702,911.83 1,805,450.12 - - - - - - 2.57 702,911.83 1,805,450.12
4 Bongkaran Cor Beton M³ 2.57 37,977.01 97,545.09 - - - - - - 2.57 37,977.01 97,545.09
I PENGADAAN BAHAN
- Pipa GIP DN 150 mm Meter 14 510,200 7,142,800
- Bend Flange GIP DN 150 x 450 Unit 4 1,854,000 7,416,000
- Flange Ring (las) DN 150 mm Unit 8 199,660 1,597,280
- Packing DN 150 mm Unit 12 50,000 600,000
- Mur Baut DN 5/8" Unit 144 3,460 498,240
- Stub Flange HDPE DN. 150 mm Unit 2 235,600 471,200
- Air Valve CI DN 50 mm Unit 1 1,968,000 1,968,000
- Socket GIP DN 50 mm Unit 1 19,500 19,500
- Double Nipple GIP DN 50 mm Unit 1 35,400 35,400
II PEMASANGAN
- Trust block beton 1 : 2 : 3 (K 175) M3 0.8 702,912 562,329
- Pemasangan Pipa GIP DN 150 mm Meter 14 42,204 590,856
- Pemasangan Fitting : -
- GIP DN 150 mm Unit 4 23,118 92,470
- HDPE DN 150 mm Unit 2 39,026 78,052
- Pemasangan Ventil CI DN 25 mm Unit 1 364,000 364,000
- Pengecatan Pipa Expose : -
- GIP DN 150 mm M2 5.657143 24,384 137,942
- Alat bantu Ls 1 5,770,926 5,770,926
Jumlah 27,344,996
Overhead 0.1 2,734,500
Jumlah harga persatuan pekerjaan 30,079,496
I PENGADAAN BAHAN
- Pipa GIP DN 150 mm Meter 21 510,200 10,714,200
- Bend Flange GIP DN 150 x 450 Unit 4 1,854,000 7,416,000
- Flange Ring (las) DN 150 mm Unit 8 199,660 1,597,280
- Packing DN 150 mm Unit 12 50,000 600,000
- Mur Baut DN 5/8" Unit 144 3,460 498,240
- Stub Flange HDPE DN. 150 mm Unit 2 235,600 471,200
- Air Valve CI DN 25 mm Unit 1 1,456,000 1,456,000
- Socket GIP DN 25 mm Unit 1 19,500 19,500
- Double Nipple GIP DN 25 mm Unit 1 35,400 35,400
II PEMASANGAN
- Trust block beton 1 : 2 : 3 (K 175) M3 0.8 702,912 562,329
- Pemasangan Pipa GIP DN 150 mm Meter 21 42,204 886,285
- Pemasangan Fitting : -
- GIP DN 150 mm Unit 4 23,118 92,470
- HDPE DN 150 mm Unit 2 39,026 78,052
- Pemasangan Ventil CI DN 25 mm Unit 1 364,000 364,000
- Pengecatan Pipa Expose : -
- GIP DN 150 mm M2 5.657143 24,384 137,942
- Alat bantu Ls 1 5,770,926 5,770,926
Jumlah 30,699,824
Overhead 0.1 3,069,982
Jumlah harga persatuan pekerjaan 33,769,807
Jenis Pekerjaan : Jembatan Pipa GIP DN 150 mm, L = 8 m'
Satuan : unit
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Satuan Volume
( Rp ) ( Rp )
I PENGADAAN BAHAN
- Pipa GIP DN 150 mm Meter 10 510,200 5,102,000
- Bend Flange GIP DN 150 x 450 Unit 4 1,854,000 7,416,000
- Flange Ring (las) DN 150 mm Unit 8 199,660 1,597,280
- Packing DN 150 mm Unit 12 50,000 600,000
- Mur Baut DN 5/8" Unit 144 3,460 498,240
- Stub Flange HDPE DN. 150 mm Unit 2 235,600 471,200
- Air Valve CI DN 25 mm Unit 1 1,456,000 1,456,000
- Socket GIP DN 25 mm Unit 1 19,500 19,500
- Double Nipple GIP DN 25 mm Unit 1 35,400 35,400
II PEMASANGAN
- Trust block beton 1 : 2 : 3 (K 175) M3 0.8 702,912 562,329
- Pemasangan Pipa GIP DN 150 mm Meter 10 42,204 422,040
- Pemasangan Fitting : -
- GIP DN 150 mm Unit 4 23,118 92,470
- HDPE DN 150 mm Unit 2 39,026 78,052
- Pemasangan Ventil CI DN 25 mm Unit 1 364,000 364,000
- Pengecatan Pipa Expose : -
- GIP DN 150 mm M2 5.657143 24,384 137,942
- Alat bantu Ls 1 5,770,926 5,770,926
Jumlah 24,623,380
Overhead 0.1 2,462,338
Jumlah harga persatuan pekerjaan 27,085,718
I PENGADAAN BAHAN
- Pipa GIP DN 150 mm Meter 9 510,200 4,591,800
- Bend Flange GIP DN 150 x 45 Unit 4 1,854,000 7,416,000
- Flange Ring (las) DN 150 mm Unit 8 199,660 1,597,280
- Packing DN 150 mm Unit 12 50,000 600,000
- Mur Baut DN 5/8" Unit 144 3,460 498,240
- Stub Flange HDPE DN. 150 mm Unit 2 235,600 471,200
- Air Valve CI DN 25 mm Unit 1 1,456,000 1,456,000
- Socket GIP DN 25 mm Unit 1 19,500 19,500
- Double Nipple GIP DN 25 mm Unit 1 35,400 35,400
II PEMASANGAN
- Trust block beton 1 : 2 : 3 (K 175) M3 0.8 702,912 562,329
- Pemasangan Pipa GIP DN 150 mm Meter 9 42,204 379,836
- Pemasangan Fitting : -
- GIP DN 150 mm Unit 4 23,118 92,470
- HDPE DN 150 mm Unit 2 39,026 78,052
- Pemasangan Ventil CI DN 25 mm Unit 1 364,000 364,000
- Pengecatan Pipa Expose : -
- GIP DN 150 mm M2 5.657143 24,384 137,942
- Alat bantu Ls 1 5,770,926 5,770,926
Jumlah 24,070,976
Overhead 0.1 2,407,098
Jumlah harga persatuan pekerjaan 26,478,073
Jenis Pekerjaan : Jembatan Pipa GIP DN 150 mm, L = 6 m'
Satuan : unit
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Satuan Volume
( Rp ) ( Rp )
I PENGADAAN BAHAN
- Pipa GIP DN 150 mm Meter 8 510,200 4,081,600
- Bend Flange GIP DN 150 x 45 Unit 4 1,854,000 7,416,000
- Flange Ring (las) DN 150 mm Unit 8 199,660 1,597,280
- Packing DN 150 mm Unit 12 50,000 600,000
- Mur Baut DN 5/8" Unit 144 3,460 498,240
- Stub Flange HDPE DN. 150 mm Unit 2 235,600 471,200
- Air Valve CI DN 25 mm Unit 1 1,456,000 1,456,000
- Socket GIP DN 25 mm Unit 1 19,500 19,500
- Double Nipple GIP DN 25 mm Unit 1 35,400 35,400
II PEMASANGAN
- Trust block beton 1 : 2 : 3 (K 175) M3 0.8 702,912 562,329
- Pemasangan Pipa GIP DN 150 mm Meter 8 42,204 337,632
- Pemasangan Fitting : -
- GIP DN 150 mm Unit 4 23,118 92,470
- HDPE DN 150 mm Unit 2 39,026 78,052
- Pemasangan Ventil CI DN 25 mm Unit 1 364,000 364,000
- Pengecatan Pipa Expose : -
- GIP DN 150 mm M2 5.657143 24,384 137,942
- Alat bantu Ls 1 5,770,926 5,770,926
Jumlah 23,518,572
Overhead 0.1 2,351,857
Jumlah harga persatuan pekerjaan 25,870,429
I PENGADAAN BAHAN
- Pipa GIP DN 200 mm Meter 15 695,500 10,432,500
- Bend Flange GIP DN 200 x 45 Unit 4 1,753,700 7,014,800
- Flange Ring (las) DN 200 mm Unit 8 261,500 2,092,000
- Packing DN 200 mm Unit 12 65,000 780,000
- Mur Baut DN 5/8" Unit 144 3,460 498,240
- Stub Flange HDPE DN. 200 mm Unit 2 804,400 1,608,800
- Air Valve CI DN 25 mm Unit 1 1,456,000 1,456,000
- Socket GIP DN 25 mm Unit 1 19,500 19,500
- Double Nipple GIP DN 25 mm Unit 1 35,400 35,400
II PEMASANGAN
- Trust block beton 1 : 2 : 3 (K 175) M3 0.8 702,912 562,329
- Pemasangan Pipa GIP DN 200 mm Meter 15 56,279 844,188
- Pemasangan Fitting : -
- GIP DN 200 mm Unit 4 23,830 95,322
- HDPE DN 200 mm Unit 2 49,026 98,052
- Pemasangan Ventil CI DN 25 mm Unit 1 364,000 364,000
- Pengecatan Pipa Expose : -
- GIP DN 200 mm M2 5.657143 24,384 137,942
- Alat bantu Ls 1 5,770,926 5,770,926
Jumlah 31,809,999
Overhead 0.1 3,181,000
Jumlah harga persatuan pekerjaan 34,990,999
I PENGADAAN BAHAN
- Pipa GIP DN 200 mm Meter 6 695,500 4,173,000
- Bend Flange GIP DN 200 x 45 Unit 4 1,753,700 7,014,800
- Flange Ring (las) DN 200 mm Unit 8 261,500 2,092,000
- Packing DN 200 mm Unit 12 65,000 780,000
- Mur Baut DN 5/8" Unit 144 3,460 498,240
- Stub Flange HDPE DN. 200 mm Unit 2 804,400 1,608,800
- Air Valve CI DN 25 mm Unit 1 1,456,000 1,456,000
- Socket GIP DN 25 mm Unit 1 19,500 19,500
- Double Nipple GIP DN 25 mm Unit 1 35,400 35,400
II PEMASANGAN
- Trust block beton 1 : 2 : 3 (K 175) M3 0.8 702,912 562,329
- Pemasangan Pipa GIP DN 200 mm Meter 6 56,279 337,675
- Pemasangan Fitting : -
- GIP DN 200 mm Unit 4 23,830 95,322
- HDPE DN 200 mm Unit 2 49,026 98,052
- Pemasangan Ventil CI DN 25 mm Unit 1 364,000 364,000
- Pengecatan Pipa Expose : -
- GIP DN 200 mm M2 5.657143 24,384 137,942
- Alat bantu Ls 1 5,770,926 5,770,926
Jumlah 25,043,986
Overhead 0.1 2,504,399
Jumlah harga persatuan pekerjaan 27,548,385
Jenis Pekerjaan : Jembatan Pipa GIP DN 350 mm, L = 6 m'
Satuan : unit
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Satuan Volume
( Rp ) ( Rp )
I PENGADAAN BAHAN
- Pipa GIP DN 350 mm Meter 8 1,400,800 11,206,400
- Bend Flange GIP DN 350 x 45 Unit 4 3,050,000 12,200,000
- Flange Ring (las) DN 350 mm Unit 8 520,600 4,164,800
- Packing DN 350 mm Unit 12 85,000 1,020,000
- Mur Baut DN 5/8" Unit 144 3,460 498,240
- Stub Flange HDPE DN. 350 mm Unit 2 2,469,000 4,938,000
- Air Valve CI DN 25 mm Unit 1 1,456,000 1,456,000
- Socket GIP DN 25 mm Unit 1 19,500 19,500
- Double Nipple GIP DN 25 mm Unit 1 35,400 35,400
II PEMASANGAN
- Trust block beton 1 : 2 : 3 (K 175) M3 0.8 702,912 562,329
- Pemasangan Pipa GIP DN 350 mm Meter 8 85,600 684,800
- Pemasangan Fitting : -
- GIP DN 350 mm Unit 4 28,600 114,400
- HDPE DN 350 mm Unit 2 59,026 118,052
- Pemasangan Ventil CI DN 25 mm Unit 1 364,000 364,000
- Pengecatan Pipa Expose : -
- GIP DN 350 mm M2 5.657143 24,384 137,942
- Alat bantu Ls 1 5,770,926 5,770,926
Jumlah 43,290,790
Overhead 0.1 4,329,079
Jumlah harga persatuan pekerjaan 47,619,868
Jenis Pekerjaan : Pemasangan pipa GIP DN. 200 mm pada jalur pipa Selubung
Satuan : m'
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Satuan Volume
( Rp ) ( Rp )
I UPAH
- Pekerja hari 0.2387 47,250.00 11,278.58
- Tukang Pipa hari 0.1467 54,000.00 7,921.80
- Mandor hari 0.0267 60,750.00 1,622.03
II BAHAN
- Pengelasan flange (luar dalam) ls 1.0000 21,813.33 21,813.33
Pipa GIP DN 200 m1 1.0000 695,500.00 695,500.00
III ALAT
- Alat Bantu ls 1.0000 8,527.15 8,527.15
Jumlah 746,662.88
Overhead 0.10 74,666.29
Jumlah harga persatuan pekerjaan 821,329.17
Jenis Pekerjaan : Pemasangan pipa GIP DN. 400 mm pada jalur pipa Selubung
Satuan : m'
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Satuan Volume
( Rp ) ( Rp )
I UPAH
- Pekerja hari 0.2387 47,250.00 11,278.58
- Tukang Pipa hari 0.1467 54,000.00 7,921.80
- Mandor hari 0.0267 60,750.00 1,622.03
II BAHAN
- Pengelasan flange (luar dalam) ls 1.0000 21,813.33 21,813.33
Pipa GIP DN 200 m1 1.0000 1,632,000.00 1,632,000.00
III ALAT
- Alat Bantu ls 1.0000 8,527.15 8,527.15
Jumlah 1,683,162.88
Overhead 0.10 168,316.29
Jumlah harga persatuan pekerjaan 1,851,479.17
Jenis Pekerjaan : Jembatan Pipa GIP DN 100 mm, L = 16 m'
Satuan : unit
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Satuan Volume
( Rp ) ( Rp )
I PENGADAAN BAHAN
- Pipa GIP DN 100 mm Meter 20.0000 392,000.00 7,840,000.00
- Bend Flange GIP DN 100 x 450 Unit 4.0000 987,500.00 3,950,000.00
- Flange Ring (las) DN 100 mm Unit 8.0000 110,830.00 886,640.00
- Packing DN 100 mm Unit 9.0000 25,000.00 225,000.00
- Mur Baut DN 5/8" Unit 72.0000 - -
- Flange Spigot PVC DN 100 mm Unit 1.0000 427,430.00 427,430.00
- Flange Socket PVC DN 100 mm (RRJ) Unit 1.0000 1,067,000.00 1,067,000.00
- Air Valve CI DN 25 mm Unit 1.0000 1,456,000.00 1,456,000.00
- Socket GIP DN 25 mm Unit 1.0000 19,500.00 19,500.00
- Double Nipple GIP DN 25 mm Unit 1.0000 25,000.00 25,000.00
II PEMASANGAN
- Trust block beton 1 : 2 : 3 (K 175) M3 1.6000 702,911.83 1,124,658.92
- Pemasangan Pipa GIP DN 100 mm Meter 20.0000 30,613.00 612,260.00
- Pemasangan Fitting :
- GIP DN 100 mm Unit 8.0000 22,404.80 179,238.40
- PVC DN 100 mm Unit 2.0000 10,368.00 20,736.00
- Pemasangan Ventil CI DN 25 mm Unit 1.0000 - -
- Pengecatan Pipa Expose :
- GIP DN 100 mm M2 5.6571 24,383.70 137,942.07
- Alat bantu Ls 1.0000 4,768,971.00 4,768,971.00
Jumlah 22,740,376.39
Overhead 0.10 2274037.63942857
Jumlah harga persatuan pekerjaan 25,014,414.03
DAFTAR HARGA SATUAN UPAH DAN BAHAN
SATUAN KERJA : PENGEMBANGAN KINERJA PENGELOLAAN AIR MINUM KALIMANTAN TIMUR
KEGIATAN : SPAM DI KAWASAN MBR (OPTIMALISASI IKK UNTUK MBR)
PAKET : P/P PIPA HPDE DN. 350 - 75 MM, KABUPATEN KUTAI KERTANEGARA
LOKASI : KABUPATEN KUTAI KERTANEGARA
TAHUN : 2015
HARGA SATUAN
NO. URAIAN SATUAN
(Rp.)
A UPAH
B BAHAN
-10%
52,500.00 10.06%
67,500.00 10.06%
60,000.00 10.06%
60,000.00 10.06%
60,000.00 10.06%
60,000.00 10.06%
60,000.00 10.06%
60,000.00 10.06%
60,000.00 10.06%
60,000.00 10.06%
60,000.00 10.06%
67,500.00 10.06%
63,750.00 10.06%
90,000.00 10.06%
10.06%
10.06%
-10% 10.06%
525.00 10.06%
3,500.00 10.06%
308,000.00 10.06%
308,000.00 10.06%
308,000.00 10.06%
1,050.00 10.06%
1,750.00 10.06%
70,000.00 10.06%
66,500.00 10.06%
227,500.00 10.06%
168.52 10.06%
157,500.00 10.06%
112.50 10.06%
147,000.00 10.06%
87,500.00 10.06%
52,500.00 10.06%
80,500.00 10.06%
10.06%
192,500.00 10.06%
175,000.00 10.06%
1,050.00 10.06%
1,400.00 10.06%
1,750.00 10.06%
4,130.00 10.06%
1,400.00 10.06%
770.00 10.06%
24,500.00 10.06%
420.00 10.06%
73,640.00 10.06%
1,050.00 10.06%
3,237.50 10.06%
31,500.00 10.06%
31,500.00 10.06%
21,000.00 10.06%
25,900.00 10.06%
17,500.00 10.06%
52,500.00 10.06%
17,500.00 10.06%
7,000.00 10.06%
15,400.00 10.06%
16,800.00 10.06%
18,200.00 10.06%
13,300.00 10.06%
5,250.00 10.06%
10,500.00 10.06%
175,000.00 10.06%
140,000.00 10.06%
1,750.00 10.06%
35,000.00 10.06%
17,500.00 10.06%
28,000.00 10.06%
21,000.00 10.06%
10,500.00 10.06%
12,250.00 10.06%
105,000.00 10.06%
28,000.00 10.06%
52,500.00 10.06%
35,700.00 10.06%
12,250.00 10.06%
10,500.00 10.06%
14,000.00 10.06%
31,500.00 10.06%
22,050.00 10.06%
22,750.00 10.06%
77,000.00 10.06%
87,500.00 10.06%
10,150.00 10.06%
9,100.00 10.06%
14,000.00 10.06%
21,000.00 10.06%
21,000.00 10.06%
21,000.00 10.06%
24,500.00 10.06%
28,000.00 10.06%
31,500.00 10.06%
17,500.00 10.06%
12,250.00 10.06%
7,700.00 10.06%
9,800.00 10.06%
9,800.00 10.06%
8,400.00 10.06%
15,050.00 10.06%
45,500.00 10.06%
4,550.00 10.06%
31,500.00 10.06%
66,500.00 10.06%
73,500.00 10.06%
17,500.00 10.06%
10,500.00 10.06%
2,170,000.00 10.06%
2,100,000.00 10.06%
1,680,000.00 10.06%
1,540,000.00 10.06%
1,260,000.00 10.06%
1,225,000.00 10.06%
1,155,000.00 10.06%
1,120,000.00 10.06%
980,000.00 10.06%
5,250.00 10.06%
42,000.00 10.06%
24,500.00 10.06%
24,500.00 10.06%
59,500.00 10.06%
108,500.00 10.06%
175,000.00 10.06%
19,600.00 10.06%
122,500.00 10.06%
9,800.00 10.06%
7,350.00 10.06%
17,850,000.00 10.06%
12,250,000.00 10.06%
4,200.00 10.06%
24,500.00 10.06%
17,500.00 10.06%
525,000.00 10.06%
437,500.00 10.06%
245,000.00 10.06%
24,500.00 10.06%
157,500.00 10.06%
17,500.00 10.06%
39,375.00 10.06%
101,500.00 10.06%
3,500.00 10.06%
7.00 10.06%
210,000.00 10.06%
5,600.00 10.06%
13,720.00 10.06%
15,400.00 10.06%
3,850.00 10.06%
3,850.00 10.06%
3,850.00 10.06%
3,850.00 10.06%
5,250.00 10.06%
332,500.00 10.06%
56,000.00 10.06%
45,500.00 10.06%
17,010.00 10.06%
26,250.00 10.06%
13,090.00 10.06%
13,720.00 10.06%
10,150.00 10.06%
5,250.00 10.06%
4,200.00 10.06%
31,500.00 10.06%
2,800.00 10.06%
17,500.00 10.06%
31,500.00 10.06%
10.06%
17,500.00 10.06%
11,827.50 10.06%
9,353.40 10.06%
8,750.00 10.06%
10,150.00 10.06%
8,750.00 10.06%
13,650.00 10.06%
2,450.00 10.06%
4,900.00 10.06%
10,850.00 10.06%
4,200.00 10.06%
525,000.00 10.06%
315,000.00 10.06%
5,600.00 10.06%
5,250.00 10.06%
350.00 10.06%
10.06%
10.06%
630,000.00 10.06%
700,000.00 10.06%
245,000.00 10.06%
315,000.00 10.06%
490,000.00 10.06%
52,500.00 10.06%
43,750.00 10.06%
77,000.00 10.06%
52,500.00 10.06%
122,500.00 10.06%
52,500.00 10.06%
52,500.00 10.06%
122,500.00 10.06%
665,000.00 10.06%
122,500.00 10.06%
157,500.00 10.06%
31,500.00 10.06%
70,000.00 10.06%
70,000.00 10.06%
122,500.00 10.06%
157,500.00 10.06%
70,000.00 10.06%
122,500.00 10.06%
140,000.00 10.06%
157,500.00 10.06%
157,500.00 10.06%
385,000.00 10.06%
122,500.00 10.06%
52,500.00 10.06%
80,500.00 10.06%
122,500.00 10.06%
39,370.00 10.06%
DAFTAR HARGA SATUAN PIPA STEEL, PIPA GIP DAN ACCESSORIES
SATUAN KERJA : PENGEMBANGAN KINERJA PENGELOLAAN AIR MINUM KALIMANTAN TIMUR
KEGIATAN : SPAM DI KAWASAN MBR (OPTIMALISASI IKK UNTUK MBR)
PAKET : P/P PIPA HPDE DN. 350 - 75 MM, KABUPATEN KUTAI KERTANEGARA
LOKASI : KABUPATEN KUTAI KERTANEGARA
TAHUN : 2015
HARGA SATUAN
NO. URAIAN SATUAN
(Rp.)
I PIPA STEEL
DN. 25 mm m¹ 39,600.00
DN. 50 mm m¹ 121,000.00
DN. 75 mm m¹ 198,800.00
DN. 100 mm m¹ 287,800.00
DN. 200 mm m¹ 688,400.00
DN. 250 mm m¹ 1,066,090.00
DN. 300 mm m¹ 1,200,100.00
DN. 25 mm m¹ 73,200.00
DN. 50 mm m¹ 185,000.00
DN. 75 mm m¹ 279,100.00
DN. 100 mm m¹ 392,000.00
DN. 150 mm m¹ 510,200.00
DN. 200 mm m¹ 695,500.00
DN. 250 mm m¹ 719,000.00
DN. 300 mm m¹ 1,515,500.00
1 WALLPIPE
3 GIBOULT JOINT
4 DRESSER JOINT
5 LOOSE FLANGE
6 BLIND FLANGE
11 BOX STREET
12 BUTTERFLY VALVE
14 WATER METER
16 BALL VALVE
17 PACKING (5 mm)
18 MUR BAUT
19 AIR VALVE
21 DOUBLE NIPPLE
21 GIBOULT JOINT
21 SOCKET GI
KETERANGAN
465,000
ANALISA HARGA SATUAN PEMBAYARAN
HARGA SATUAN
HARGA SATUAN
HARGA SATUAN
HARGA SATUAN
HARGA SATUAN
ANALISA HARGA SATUAN PEMBAYARAN
HARGA SATUAN
HARGA SATUAN
HARGA SATUAN
HARGA SATUAN
HARGA SATUAN
AYARAN
1,400,800.00 12,607,200.00
510,200.00 3,061,200.00
3,050,000.00 12,200,000.00
1,314,000.00 1,314,000.00
5,770,000.00 5,770,000.00
19,400,000.00 19,400,000.00 1
5,500,000.00 11,000,000.00
6,422,400.00 6,422,400.00
2,469,000.00 4,938,000.00
482,625.00 2,895,750.00 8
171,875.00 343,750.00 4
190,000.00 2,090,000.00 32
50,000.00 200,000.00
7,500.00 1,230,000.00 12
150,000.00 900,000.00 11
328,500.00 328,500.00 132
245,600.00 245,600.00 164
500,000.00 1,000,000.00
5,770,926.00 5,770,926.00
91,717,326.00
510,200.00 11,224,400.00
876,500.00 3,506,000.00
513,300.00 1,026,600.00
906,250.00 5,437,500.00
50,000.00 550,000.00
- -
- -
500,000.00 1,000,000.00
22,744,500.00
AYARAN
510,200.00 4,591,800.00
876,500.00 3,506,000.00
513,300.00 1,026,600.00
906,250.00 5,437,500.00
50,000.00 550,000.00
- -
- -
500,000.00 1,000,000.00
16,111,900.00
AYARAN
HARGA SATUAN JUMLAH
(Rupiah) (Rupiah)
510,200.00 4,591,800.00
1,120,750.00 4,483,000.00
513,300.00 1,026,600.00
199,660.00 1,197,960.00
50,000.00 400,000.00
15,000.00 975,000.00
145,979.20 291,958.40
5,770,926.00 5,770,926.00
18,737,244.40
AYARAN
510,200.00 4,591,800.00
392,000.00 2,352,000.00
5,500,000.00 5,500,000.00
3,500,000.00 3,500,000.00
1,120,750.00 4,483,000.00
1,050,000.00 1,050,000.00
513,300.00 1,026,600.00
1,968,000.00 1,968,000.00
513,300.00 3,079,800.00
110,830.00 332,490.00
50,000.00 550,000.00
25,000.00 100,000.00
245,600.00 245,600.00
175,000.00 175,000.00
15,000.00 1,800,000.00
145,979.20 875,875.20
5,770,926.00 5,770,926.00
37,401,091.20
AYARAN
695,500.00 6,259,500.00
1,120,750.00 4,483,000.00 8
513,300.00 1,026,600.00 8
110,830.00 664,980.00 64
50,000.00 550,000.00
15,000.00 960,000.00
145,979.20 291,958.40
500,000.00 1,000,000.00
5,770,926.00 5,770,926.00
21,006,964.40
AYARAN
695,500.00 10,432,500.00
510,200.00 3,061,200.00
987,500.00 3,950,000.00
1,753,700.00 1,753,700.00
280,000.00 280,000.00
3,500,000.00 3,500,000.00
615,470.00 615,470.00
1,968,000.00 1,968,000.00
370,000.00 740,000.00
110,830.00 664,980.00
70,160.00 140,320.00
25,000.00 275,000.00
15,000.00 60,000.00
356,200.00 356,200.00
175,000.00 175,000.00
15,000.00 1,560,000.00
75,914.48 379,572.40
500,000.00 1,000,000.00
5,770,926.00 5,770,926.00
36,682,868.40
695,500.00 6,955,000.00
1,753,700.00 7,014,800.00
370,000.00 740,000.00
261,500.00 1,569,000.00
75,000.00 825,000.00
15,000.00 1,320,000.00
200,000.00 1,600,000.00
500,000.00 4,000,000.00
3,500.00 112,000.00
37,977.01 75,954.02
500,000.00 1,000,000.00
5,770,926.00 5,770,926.00
30,982,680.02
AYARAN
639,375.00 4,475,625.00
987,500.00 3,950,000.00
370,000.00 740,000.00
987,500.00 5,925,000.00
95,600.00 1,051,600.00
#REF! #REF!
#REF! #REF!
500,000.00 1,000,000.00
2,500,000.00 2,500,000.00
#REF!
AYARAN
1,400,800.00 16,809,600.00 8
3,050,000.00 12,200,000.00 12
2,469,000.00 4,938,000.00 96
520,600.00 3,123,600.00
85,000.00 935,000.00
7,500.00 720,000.00
364,000.00 728,000.00
500,000.00 1,000,000.00
5,770,926.00 5,770,926.00
46,225,126.00
ADENDUM KONTRAK PT. CITRA KARYA INDO RAYA
1 PEKERJAAN PENDAHULUAN
1 Mobilisasi-Demobilisasi, Pengukuran & Pematokan Ls 100,000,000.00 1.00 100,000,000.00 - -
2 Pelaporan, Gambar (Shop Drawing+Asbuilt Drawing),
Dokumentasi & Administrasi Proyek Ls 35,000,000.00 1.00 35,000,000.00 - -
Jumlah Total 1 135,000,000.00
2.2 P/P Pipa HDPE DIA 350 - 75 mm, IKK Bangun Rejo Kec. Tenggarong Seberang
2.2.1 Pipa HDPE Ø 350 mm, S 8 - SDR 17 (PN 10/PE100)
1 Pengadaan Pipa M' 1,514,490.00 500.00 757,245,000.00 360.00 545,216,400.00
2 Pemasangan Pipa M' 230,219.55 500.00 115,109,775.00 360.00 82,879,038.00 -
-
2.2.2 Pipa HDPE Ø 200 mm, S 8 - SDR 17 (PN 10/PE100) -
1 Pengadaan Pipa M' 573,860.00 798.00 457,940,280.00 - - 798.00
2 Pemasangan Pipa M' 149,293.39 798.00 119,136,125.22 - - 798.00
2.3 P/P Pipa HDPE DIA 150 - 75 mm, IKK Loa Janan Kec. Loa Janan
2.3.1 Pipa HDPE Ø 150 mm, S 8 - SDR 17 (PN 10/PE100)
1 Pengadaan Pipa M' 366,760.00 1,200.00 440,112,000.00 - - 1,200.00
2 Pemasangan Pipa M' 119,575.24 1,200.00 143,490,288.00 - - 1,200.00
-
2.3.2 Pipa HDPE Ø 75 mm, S 8 - SDR 17 (PN 10/PE100) -
1 Pengadaan Pipa M' 69,110.00 3,600.00 248,796,000.00 - 3,600.00
2 Pemasangan Pipa M' 67,521.63 3,600.00 243,077,868.00 - 3,600.00
-
3.2 IKK Bangun Rejo Kec. Tenggarong Seberang -
1 Cor Beton 1 : 2 : 3 M³ 702,911.83 4.20 2,952,229.69 - - 3.20
2 Bongkaran Cor Beton M³ 37,977.01 4.20 159,503.44 - - 3.20
3 Jembatan Pipa -
Ø - 350 mm L : 6 m Unit 47,619,868.49 - - 2.00 95,239,736.98 -
4 Pipa Selubung ( GI ) Ø 400 mm M' 1,851,479.17 - - 8.00 14,811,833.34 -
5 Pekerjaan Drainase M³ 846,594.00 23.00 19,471,662.00
6 Crossing Jalan Aspal Ø 350 mm L: 8m Ls 126,982.35 - 1.00 126,982.35 -
147,710.00 - - KURANG
94,081.96 - - KURANG
146,789,640.00 - - KURANG
143,415,942.12 - - KURANG
-
-
-
1.00 1,692,900.00 BARU
1.00 3,354,640.00 BARU
2.00 18,480,000.00 BARU
2.00 2,137,500.00 BARU
5.00 550,000.00 BARU
1.00 3,154,900.00 BARU
60.00 - BARU
- KURANG
- KURANG
- KURANG
- KURANG
- KURANG
- KURANG
- KURANG
- KURANG
- KURANG
- KURANG
268,754,933.87 1,533,509,623.60
PEKERJAAN KURANG ADENDUM-01 KETERANGAN
Jumlah Jumlah
Volume
Harga( Rupiah ) Harga( Rupiah )
12 13 15 16
440,112,000.00 - - KURANG
143,490,288.00 - - KURANG
-
-
248,796,000.00 - - KURANG
243,077,868.00 - - KURANG
9,776,244.00 - - KURANG
2.00 1,821,600.00 BARU
1.00 873,670.05 BARU
24,302,335.20 - - KURANG
7.00 5,630,800.00 BARU
8,563,770.40 - - KURANG
4.00 28,000,000.00 BARU
67,194,881.60 1.00 6,108,625.60 KURANG
17,403,906.40 - - KURANG
4.00 1,424,800.00 BARU
2.00 1,120,000.00 BARU
2,955,893.60 1.00 268,717.60 KURANG
2,481,646.40 - - KURANG
1.00 1,256,000.00 BARU
4.00 3,420,000.00 BARU
8,010,783.84 - - KURANG
5,972,058.40 - - KURANG
414,025.80 KURANG
- 1.00 261,360.00 BARU
9.00 675,000.00 BARU
2.00 100,000.00 BARU
64.00 480,000.00 BARU
1,500,800.40 - - KURANG
- 4.00 800,000.00 BARU
3,567,980.56 22.00 1,670,118.56 KURANG
1,227,620,482.60 2,331,843,873.30
1,823,804,735.99 5,485,170,527.29
-
-
2,249,317.86 1.00 702,911.83 KURANG
121,526.43 1.00 37,977.01 KURANG
-
2.00 95,239,736.98 BARU
8.00 14,811,833.34 BARU
23.00 19,471,662.00 BARU
1.00 126,982.35 BARU
- -
- -
29,516,295.55 - - KURANG
PEKERJAAN KURANG ADENDUM-01 KETERANGAN
Jumlah Jumlah
Volume
Harga( Rupiah ) Harga( Rupiah )
12 13 15 16
1.00 36,682,868.40 BARU
1.00 30,982,680.02 BARU
4.00 84,027,857.60 BARU
9,021,350.04 - - KURANG
46.00 33,074,000.00 BARU
6.87 4,827,970.99 TETAP
6.87 260,846.23 TETAP
41,366,018.44 Err:509
1,865,170,754.43 Err:509
Err:509
Err:509
Err:509
DAFTAR HARGA SATUAN PEKERJAAN
SATUAN KERJA : PENGEMBANGAN KINERJA PENGELOLAAN AIR MINUM KALIMANTAN TIMUR
KEGIATAN : SPAM DI KAWASAN MBR (OPTIMALISASI IKK UNTUK MBR)
PAKET : P/P PIPA HPDE DN. 350 - 75 MM, KABUPATEN KUTAI KERTANEGARA
LOKASI : KABUPATEN KUTAI KERTANEGARA
TAHUN : 2015
I. PEKERJAAN PERSIAPAN
V. PEKERJAAN PLESTERAN
36 Membuat Lantai Kerja Beton Mutu f'c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87 1 m3
37 Membuat Beton Mutu f'c = 14,5 MPa (K 175), slump (12 + 2) cm, w/c = 0,66 1 m3
38 Membuat Beton Mutu f'c = 19,3 MPa (K 225), slump (12 + 2) cm, w/c = 0,58 1 m3
39 Memasang PVC waterstop lebar 20 cm 1 m'
40 Pembesian dengan besi polos atau berulir 1 kg
41 Pasang bekisting untuk pondasi 1 m2
42 Pasang bekisting untuk sloof 1 m2
43 Pasang bekisting untuk kolom 1 m2
44 Pasang bekisting untuk balok 1 m2
45 Pasang bekisting untuk plat lantai / atap beton 1 m2
46 Pasang bekisting untuk dinding 1 m2
47 Pasang bekisting untuk dinding tahap atas (asumsi 2 x pakai) 1 m2
48 Membuat sloof beton bertulang (200 kg besi + bekisting) 1 m3
49 Membuat balok beton bertulang (200 kg besi + bekisting) 1 m3
50 Membuat kolom beton bertulang (150 kg besi + bekisting) 1 m3
51 Membuat kolom praktis beton bertulang (11 x 11 cm) 1 m'
52 Membuat ring balok beton bertulang (10 x 15 cm) 1 m3
53 Membuat dinding beton bertulang (150 kg besi + bekisting) 1 m3
X. PEKERJAAN SANITASI
HARGA SATUAN
KET.
(Rp.)
8,538.75
35,625.54
40,651.88
54,113.40
73,321.88
81,972.00
30,160.35
29,328.75
120,210.75
110,298.38
37,977.01
742,657.85
836,659.56
472,244.85
85,557.07
78,581.42
70,690.68
288,190.21
39,989.47
36,452.13
53,501.45
48,736.49
413,992.70
34,809.17
21,032.00
1,553,340.25
329,793.75
248,589.00
369,710.55
2,893,085.80
2,461,272.00
58,249.73
37,714.99
27,381.81
1,405,757.93
628,360.70
702,911.83
745,539.58
82,793.70
16,050.38
98,161.80
104,225.55
201,940.20
260,427.20
422,173.40
313,696.90
146,857.15
3,117,833.95
4,421,674.68
4,483,503.20
3,866,909.09
4,343,614.00
2,641,994.03
122,609.41
79,329.47
34,645.05
12,570.72
37,627.32
37,681.88
28,586.25
502,213.80
754,985.55
949,609.24
31,717.13
146,918.48
27,951.41
24,602.12
106,029.62
131,982.07
130,103.82
17,048.90
194,318.74
174,018.24
192,091.24
143,732.93
20,970.92
13,755.06
17,358.66
24,383.70
18,883.26
1,120.41
1,774,311.21
615,362.54
6,079,696.48
5,117,601.63
3,089,779.46
15,414.40
294,128.08
203,901.80
295,812.00
387,908.13
142,618.75
163,696.25
40,651.88
36,586.69
32,419.87
28,456.31
24,696.01
21,138.98
12,093.93
8,536.89
54,113.40
48,702.06
43,155.44
37,879.38
32,873.89
28,138.97
16,098.74
11,363.81
73,321.88
65,989.69
58,474.20
51,325.31
44,543.04
38,127.38
21,813.26
15,397.59
36,063.23
31,194.69
27,155.61
23,272.80
19,510.20
15,891.86
13,139.03
10,578.55
17,597.25
16,993.08
15,057.38
13,156.88
10,259.20
9,449.72
6,909.85
5,073.87
26,395.88
24,325.27
21,949.64
19,609.20
17,298.10
15,022.19
8,596.26
6,041.72
75,622.80
65,847.63
56,279.17
42,204.03
30,613.00
25,659.48
18,906.36
103,237.20
90,525.60
77,814.00
61,538.40
45,262.80
21,176.10
16,602.30
9,697.05
7,246.80
32,076.00
27,932.85
28,823.85
19,896.03
15,503.40
12,242.34
11,164.23
2,715,589.80
1,151,964.00
746,565.60
608,625.60
480,955.20
285,199.20
210,672.00
25,612.40
24,543.20
23,830.40
23,117.60
22,404.80
20,979.20
19,910.00
32,209.65
64,315.35
53,950.05
39,575.25
31,660.20
19,290.15
12,934.35
73,151.10
61,776.00
50,400.90
39,025.80
27,650.70
16,275.60
9,919.80
13,284.00
12,312.00
11,664.00
11,016.00
10,368.00
9,072.00
8,100.00
1,322.10
1,224.86
1,145.30
1,083.42
1,039.22
1,023.75
1,012.70
1,378.41
1,281.17
1,201.61
1,139.73
1,095.53
1,080.06
1,069.01
601,995.76
303,183.49
227,842.45
195,727.76
29,398,963.74
23,536,899.84
16,314,731.04
8,947,563.54
6,742,274.49
2,599,736.26
3,428,575.97
2,064,682.51
2,745,970.97
449,149.94
29,516,295.55 2,459,691
22,956,307.66
20,407,371.99
12,659,104.06
32,249,765.63 5,374,961
4,380,052.64
2,932,600.00
11,817,985.21
5,270,747.63 15,770,747.63
DAFTAR KUANTITAS DAN HARGA
SATUAN KERJA : PENGEMBANGAN KINERJA PENGELOLAAN AIR MINUM KALIMANTAN TIMUR
KEGIATAN : SPAM DI KAWASAN MBR (OPTIMALISASI IKK UNTUK MBR)
PAKET : P/P PIPA HPDE DN. 350 - 75 MM, KABUPATEN KUTAI KERTANEGARA
LOKASI : KABUPATEN KUTAI KERTANEGARA
TAHUN : 2015
I. PEKERJAAN PENDAHULUAN
SUB TOTAL I
II.1 P/P PIPA HDPE DN. 150 - 50 MM, IKK SANGA - SANGA, KEC. SANGA - SANGA
II.1.1 PIPA HDPE DN. 150 MM, S 8 - SDR 17 (PN 10/PE 100)
II.1.2 PIPA HDPE DN. 100 MM, S 8 - SDR 17 (PN 10/PE 100)
1 Tee HDPE
- DN. 150 mm x 100 mm Bh 2.00
- DN. 150 mm x 75 mm Bh 3.00
- DN. 100 mm x 75 mm Bh 4.00
- DN. 75 mm x 75 mm Bh 2.00
2 Stub Flange HDPE
- DN. 150 mm Bh 2.00
- DN. 100 mm Bh 4.00
- DN. 75 mm Bh 18.00
3 Gate Valve All Flange (CI)
- DN. 150 mm Bh 1.00
- DN. 100 mm Bh 2.00
- DN. 75 mm Bh 9.00
4 Street Box
- DN. 150 mm Bh 1.00
- DN. 100 mm Bh 2.00
- DN. 75 mm Bh 9.00
5 Segmented Bend HDPE
- DN. 150 mm x 45 degree Bh 2.00
- DN. 100 mm x 90 degree Bh 2.00
- DN. 100 mm x 45 degree Bh 2.00
- DN. 75 mm x 90 degree Bh 7.00
6 DOP HDPE
- DN. 150 mm Bh 1.00
- DN. 100 mm Bh 2.00
- DN. 75 mm Bh 9.00
7 Thrust Block Bh 36.00
II.2 P/P PIPA HDPE DN. 350 - 75 MM, IKK BANGUN REJO, KEC. TENGGARONG SEBERANG
II.2.1 PIPA HDPE DN. 350 MM, S 8 - SDR 17 (PN 10/PE 100)
II.2.2 PIPA HDPE DN. 200 MM, S 8 - SDR 17 (PN 10/PE 100)
II.2.3 PIPA HDPE DN. 150 MM, S 8 - SDR 17 (PN 10/PE 100)
1 Tee HDPE
- DN. 300 mm x 200 mm Bh 1.00
- DN. 200 mm x 150 mm Bh 1.00
- DN. 150 mm x 75 mm Bh 2.00
- DN. 75 mm x 75 mm Bh 2.00
2 Stub Flange HDPE
- DN. 150 mm Bh 2.00
- DN. 75 mm Bh 4.00
3 Gate Valve All Flange (CI)
- DN. 150 mm Bh 1.00
- DN. 75 mm Bh 2.00
4 Street Box
- DN. 150 mm Bh 1.00
- DN. 75 mm Bh 2.00
5 Segmented Bend HDPE
- DN. 150 mm x 90 degree Bh 1.00
- DN. 75 mm x 90 degree Bh 7.00
6 DOP HDPE
- DN. 200 mm Bh 1.00
- DN. 150 mm Bh 1.00
- DN. 75 mm Bh 2.00
7 Reducer HDPE
- DN. 300 mm x 200 mm Bh 1.00
8 Thrust Block Bh 18.00
II.3 P/P PIPA HDPE DN. 150 - 75 MM, IKK LOA JANAN, KEC. LOA JANAN
II.3.1 PIPA HDPE DN. 150 MM, S 8 - SDR 17 (PN 10/PE 100)
1 Tee HDPE
- DN. 150 mm x 75 mm Bh 16.00
2 Stub Flange HDPE
- DN. 150 mm Bh 44.00
- DN. 75 mm Bh 34.00
3 Gate Valve All Flange (CI)
- DN. 150 mm Bh 12.00
- DN. 75 mm Bh 17.00
4 Street Box
- DN. 150 mm Bh 12.00
- DN. 75 mm Bh 17.00
5 Segmented Bend HDPE
- DN. 150 mm x 90 degree Bh 12.00
- DN. 75 mm x 90 degree Bh 14.00
6 DOP HDPE
- DN. 150 mm Bh 1.00
- DN. 75 mm Bh 9.00
7 Thrust Block Bh 69.00
1 Jembatan Pipa
- DN. 150 mm L = 12 M Unit 1.00
1 Pipa Selubung GI
- DN. 200 mm m1 12.00
2 Cor Beton 1 : 2 : 3 m3 2.57
3 Bongkaran Cor Beton m3 2.57
SUB TOTAL IV
A
11,405,189.47
- -
- -
- -
702,911.83 2,952,229.67 2,952,229.67 -
37,977.01 159,503.42 159,503.42 -
- -
3,111,733.09
- -
- -
- -
- -
29,516,295.55 29,516,295.55 29,516,295.55 -
- -
751,779.17 9,021,350.02 9,021,350.02 -
702,911.83 1,806,483.39 1,806,483.39 -
37,977.01 97,600.90 97,600.90 -
- -
40,441,729.86
54,958,652.42
- -
- -
- -
34,383,883.82 34,383,883.82 34,383,883.82 -
- -
34,383,883.82
5,814,030,727.19 TOTAL
581,403,072.72 PPN 10%
6,395,433,799.91 JUMLAH TOTAL
6,395,433,000.00 PEMBULATAN
HARGA PENAWARAN
TURUN 4,5% DARI HP
LINK HARGA SATUAN PENGADAAN PIPA SALAH LINK MENJADI HARGA SATUAN PEMASANGAN PIPA
TOTAL
PPN 10%
JUMLAH TOTAL
PEMBULATAN
HARGA PENAWARAN
SELISIH
HARGA SATUAN
NO. URAIAN SATUAN
(Rp.)
1 TEE HDPE
OD. 75 x 75 mm Unit 287,900.00
OD. 90 x 90 mm Unit 396,600.00
OD. 110 x 110 mm Unit 464,300.00
OD. 125 x 125 mm Unit 642,900.00
OD. 160 x 160 mm Unit 714,300.00
OD. 180 x 180 mm Unit 839,300.00
OD. 200 x 200 mm Unit 910,800.00
OD. 225 x 225 mm Unit 1,160,800.00
OD. 250 x 250 mm Unit 1,310,800.00
OD. 280 x 280 mm Unit 1,559,000.00
OD. 315 x 315 mm Unit 1,623,700.00
OD. 400 x 400 mm Unit 7,103,600.00
TEE REDUCER
OD. 63 x 50 mm Unit 57,900.00
OD. 75 x 50 mm Unit 81,100.00
OD. 75 x 63 mm Unit 81,100.00
OD. 90 x 63 mm Unit 112,100.00
OD. 90 x 75 mm Unit 112,100.00
OD. 110 x 63 mm Unit 148,400.00
OD. 110 x 75 mm Unit 148,400.00
OD. 110 x 90 mm Unit 148,400.00
OD. 125 x 90 mm Unit 210,300.00
OD. 125 x 110 mm Unit 210,300.00
OD. 160 x 63 mm Unit 394,900.00
OD. 160 x 75 mm Unit 394,900.00
OD. 160 x 90 mm Unit 394,900.00
OD. 160 x 110 mm Unit 394,900.00
2 BEND HDPE
OD. 315 mm x 45º Unit 1,042,200.00
OD. 400 mm x 45º Unit 1,488,900.00
OD. 315 mm x 90º Unit 1,555,200.00
OD. 400 mm x 90º Unit 2,051,500.00
IV ACCESSORIES
3 DOP PVC
DN. 50 mm Unit 76,500.00
DN. 75 mm Unit 125,400.00
DN. 100 mm Unit 189,700.00
DN. 150 mm Unit 312,500.00
DN. 200 mm Unit 456,700.00
DN. 250 mm Unit 679,200.00
DN. 300 mm Unit 713,500.00
DN. 400 mm Unit 1,007,300.00
4 FLEXIBLE JOINT
DN. 250 mm Unit 2,747,500.00
DN. 300 mm Unit 2,800,000.00
DN. 400 mm Unit 5,950,000.00
DN. 500 mm Unit 7,654,000.00
5 FLANGE SOCKET
DN. 50 mm Unit 565,000.00
DN. 75 mm Unit 789,000.00
DN. 100 mm Unit 1,067,000.00
DN. 150 mm Unit 1,256,000.00
DN. 200 mm Unit 1,413,400.00
DN. 250 mm Unit 2,842,000.00
DN. 300 mm Unit 3,354,640.00
DN. 400 mm Unit 4,235,600.00
6 FLANGE SPIGOT
DN. 50 mm Unit 215,600.00
DN. 75 mm Unit 356,800.00
DN. 100 mm Unit 427,430.00
DN. 150 mm Unit 800,720.00
DN. 200 mm Unit 1,189,660.00
DN. 250 mm Unit 2,308,110.00
DN. 300 mm Unit 3,144,490.00
DN. 400 mm Unit 3,987,600.00
KETERANGAN
12%
9,350.00 10.06%
27,280.00
43,560.00
61,710.00
131,890.00
327,470.00
512,380.00
796,400.00
1,265,000.00
1,352,230.00
1,708,520.00
DAFTAR HARGA SATUAN PIPA STEEL, PIPA GIP DAN ACCESSORIES
SATUAN KERJA : PENGEMBANGAN KINERJA PENGELOLAAN AIR MINUM KALIMANTAN TIMUR
KEGIATAN : SPAM DI KAWASAN MBR (OPTIMALISASI IKK UNTUK MBR)
PAKET : P/P PIPA HPDE DN. 350 - 75 MM, KABUPATEN KUTAI KERTANEGARA
LOKASI : KABUPATEN KUTAI KERTANEGARA
TAHUN : 2015
HARGA SATUAN
NO. URAIAN SATUAN
(Rp.)
I PIPA STEEL
DN. 25 mm m¹ 39,600.00
DN. 50 mm m¹ 121,000.00
DN. 75 mm m¹ 198,800.00
DN. 100 mm m¹ 287,800.00
DN. 200 mm m¹ 688,400.00
DN. 250 mm m¹ 1,066,090.00
DN. 300 mm m¹ 1,200,100.00
DN. 25 mm m¹ 73,200.00
DN. 50 mm m¹ 185,000.00
DN. 75 mm m¹ 279,100.00
DN. 100 mm m¹ 392,000.00
DN. 150 mm m¹ 510,200.00
DN. 200 mm m¹ 695,500.00
DN. 250 mm m¹ 719,000.00
DN. 300 mm m¹ 1,515,500.00
1 WALLPIPE
3 GIBOULT JOINT
4 DRESSER JOINT
5 LOOSE FLANGE
6 BLIND FLANGE
11 BOX STREET
12 BUTTERFLY VALVE
14 WATER METER
16 BALL VALVE
17 PACKING (5 mm)
18 MUR BAUT
19 AIR VALVE
21 DOUBLE NIPPLE
21 GIBOULT JOINT
21 SOCKET GI
KETERANGAN
465,000
ADENDUM KONTRAK PT. CITRA KARYA INDO RAYA
1 PEKERJAAN PENDAHULUAN
1 Mobilisasi-Demobilisasi, Pengukuran & Pematokan Ls 100,000,000.00 1.00 100,000,000.00 - - 1.00 100,000,000.00 TETAP
2 Pelaporan, Gambar (Shop Drawing+Asbuilt Drawing), -
Dokumentasi & Administrasi Proyek Ls 35,000,000.00 1.00 35,000,000.00 - - 1.00 35,000,000.00 TETAP
Jumlah Total 1 135,000,000.00 135,000,000.00
2.2 P/P Pipa HDPE DIA 350 - 75 mm, IKK Bangun Rejo Kec. Tenggarong Seberang
2.2.1 Pipa HDPE Ø 350 mm, S 8 - SDR 17 (PN 10/PE100)
1 Pengadaan Pipa M' 1,514,490.00 500.00 757,245,000.00 360.00 545,216,400.00 - - 860.00 1,302,461,400.00 TAMBAH
2 Pemasangan Pipa M' 230,219.55 500.00 115,109,775.00 360.00 82,879,038.00 - - 860.00 197,988,813.00 TAMBAH
- - -
2.2.2 Pipa HDPE Ø 200 mm, S 8 - SDR 17 (PN 10/PE100) - - -
1 Pengadaan Pipa M' 573,860.00 798.00 457,940,280.00 - - 798.00 573,860.00 - - KURANG
2 Pemasangan Pipa M' 149,293.39 798.00 119,136,125.22 - - 798.00 149,293.39 - - KURANG
- -
2.2.3 Pipa HDPE Ø 150 mm, S 8 - SDR 17 (PN 10/PE100) - -
1 Pengadaan Pipa M' 366,760.00 910.00 333,751,600.00 - 910.00 366,760.00 - - KURANG
2 Pemasangan Pipa M' 119,575.24 910.00 108,813,468.40 - 910.00 119,575.24 - - KURANG
-
2.2.4 Pipa HDPE Ø 75 mm, S 8 - SDR 17 (PN 10/PE100) -
1 Pengadaan Pipa M' 69,110.00 1,800.00 124,398,000.00 1,800.00 124,398,000.00 - - KURANG
2 Pemasangan Pipa M' 67,521.63 1,800.00 121,538,934.00 1,800.00 121,538,934.00 - - KURANG
- -
2.2.5 Pengadaan Dan Pemasangan Accessories Pipa - -
1 Tee HDPE Ø 300 x 200 mm Bh 1,331,169.65 1.00 1,331,169.65 1.00 1,331,169.65 - - KURANG
2 Tee HDPE Ø 200 x 150 mm Bh 873,670.05 1.00 873,670.05 1.00 873,670.05 - - KURANG
3 Tee HDPE Ø 150 x 75 mm Bh 611,015.25 2.00 1,222,030.50 2.00 1,222,030.50 - - KURANG
4 Tee HDPE Ø 75 x 75 mm Bh 307,190.15 2.00 614,380.30 2.00 614,380.30 - - KURANG
5 Stub Flange (HDPE) Ø 350 mm Bh 2,469,000.00 1.00 2,469,000.00 1.00 2,469,000.00 TAMBAH BARU
6 Stub Flange (HDPE) Ø 150 mm Bh 552,325.80 2.00 1,104,651.60 2.00 1,104,651.60 - - KURANG
7 Stub Flange (HDPE) Ø 75 mm Bh 251,875.60 4.00 1,007,502.40 4.00 1,007,502.40 - - KURANG
8 Gate Valve All Flange (CI) Ø 150 mm Bh 6,108,625.60 1.00 6,108,625.60 1.00 6,108,625.60 - - KURANG
9 Gate Valve All Flange (CI) Ø 75 mm Bh 1,023,759.20 2.00 2,047,518.40 2.00 2,047,518.40 - - KURANG
10 Street Box Ø 300 mm Bh 689,000.00 2.00 1,378,000.00 - 2.00 1,378,000.00 TAMBAH BARU
11 Street Box Ø 150 mm Bh 268,717.60 1.00 268,717.60 1.00 268,717.60 - - KURANG
12 Street Box Ø 75 mm Bh 145,979.20 2.00 291,958.40 2.00 291,958.40 - KURANG
13 Segmented Bend (HDPE) 90° Ø 150 mm Bh 667,565.32 1.00 667,565.32 1.00 667,565.32 - - KURANG
14 Segmented Bend (HDPE) 90° Ø 75 mm Bh 426,575.60 7.00 2,986,029.20 7.00 2,986,029.20 - - KURANG
15 DOP (HDPE) Ø 200 mm Bh 598,440.90 1.00 598,440.90 1.00 598,440.90 - - KURANG
16 DOP (HDPE) Ø 150 mm Bh 414,025.80 1.00 414,025.80 1.00 414,025.80 - - KURANG
17 DOP (HDPE) Ø 75 mm Bh 166,755.60 2.00 333,511.20 2.00 333,511.20 - - KURANG
18 Reduser HDPE Ø 300 x 200 mm Bh 1,055,484.00 1.00 1,055,484.00 1.00 1,055,484.00 - - KURANG
19 Reduser HDPE Ø 350 x 300 mm Bh 4,712,890.00 1.00 4,712,890.00 1.00 4,712,890.00 TAMBAH BARU
20 Thrust Block Bh 75,914.48 18.00 1,366,460.64 9.00 683,230.32 9.00 683,230.32 KURANG
21 Bend 45° HDPE Ø 350mm Bh 2,253,600.00 2.00 4,507,200.00 2.00 4,507,200.00 TAMBAH BARU
22 Patok Tanda Accessories ( Gate Valve dan DOP ) Titik 200,000.00 3.00 600,000.00 3.00 600,000.00 TAMBAH BARU
23 Baut 5/8 Bh 7,500.00 12.00 90,000.00 12.00 90,000.00 TAMBAH BARU
-
2.2.5 MATERIAL PEK. KONEKSI PIPA HDPE Ø 350 KE EX. PVC Ø -
300 mm -
1 Stub Flange HDPE Ø 300 mm Bh 1,692,900.00 1.00 1,692,900.00 1.00 1,692,900.00 TAMBAH BARU
2 Flange Socet Ø 300 mm Bh 3,354,640.00 1.00 3,354,640.00 1.00 3,354,640.00 TAMBAH BARU
3 Gate Valve Ø 300 Bh 9,240,000.00 2.00 18,480,000.00 2.00 18,480,000.00 TAMBAH BARU
4 Gibol Joint Ø 300 Bh 1,068,750.00 2.00 2,137,500.00 2.00 2,137,500.00 TAMBAH BARU
5 Paking Ø 300mm Bh 110,000.00 5.00 550,000.00 5.00 550,000.00 TAMBAH BARU
6 Tee PVC Ø 300 x 300 mm Bh 3,154,900.00 1.00 3,154,900.00 1.00 3,154,900.00 TAMBAH BARU
7 Baut 5/8 Bh 7,500.00 60.00 450,000.00 60.00 450,000.00 TAMBAH BARU
2.3 P/P Pipa HDPE DIA 150 - 75 mm, IKK Loa Janan Kec. Loa Janan
2.3.1 Pipa HDPE Ø 150 mm, S 8 - SDR 17 (PN 10/PE100)
1 Pengadaan Pipa M' 366,760.00 1,200.00 440,112,000.00 - - 1,200.00 440,112,000.00 - - KURANG
2 Pemasangan Pipa M' 119,575.24 1,200.00 143,490,288.00 - - 1,200.00 143,490,288.00 - - KURANG
- -
2.3.2 Pipa HDPE Ø 75 mm, S 8 - SDR 17 (PN 10/PE100) - -
1 Pengadaan Pipa M' 69,110.00 3,600.00 248,796,000.00 - 3,600.00 248,796,000.00 - - KURANG
2 Pemasangan Pipa M' 67,521.63 3,600.00 243,077,868.00 - 3,600.00 243,077,868.00 - - KURANG