HARGA PENAWARAN PEKERJAAN
PEKERJAAN ELEKTRIKAL DAN PLUMBING
PEMASANGAN HURUF LOGO TIMAH MIND ID DAN PERBAIKAN KOLAM SAMPING POS POLISI
PT TIMAH TBK
Jumlah B 23,212,000.00
C Pekerjaan Plumbing instalasi filter air kolam
1 Tabung filter air lengkap aksesoris dihitung set 1.00 2,500,000.00 2,500,000.00
2 Pemasangan pompa kolam dan filter ; lengkap dengan tutup pengaman pompa dihitung unit 2.00 975,000.00 1,950,000.00
3 Memasang 1 m' Pipa PVC Tipe AW Ø 2" M.4 m' 35.00 62,035.00 2,171,225.00
4 Memasang 1 m' Pipa PVC Tipe AW Ø 1" M3 m' 30.00 36,690.00 1,100,700.00
5 Pasang Stopkrane Pipa PVC 2" dihitung bh 3.00 225,000.00 675,000.00
6 Pasang Stopkran Pipa PVC 1" dihitung bh 10.00 95,000.00 950,000.00
7 Fitting reducer pipa 2" ke 1" Type AW dihitung bh 8.00 25,000.00 200,000.00
8 Fitting reducer pipa 1,5" ke 1" Type AW dihitung bh 5.00 23,000.00 115,000.00
9 Tebow pipa PVC Dia. 2" Type AW dihitung bh 12.00 44,000.00 528,000.00
10 Tebow pipa PVC Dia. 1" Type AW dihitung bh 12.00 28,000.00 336,000.00
11 Elbow Pipa PVC Dia. 2" Type AW dihitung bh 6.00 30,000.00 180,000.00
12 Elbow Pipa PVC Dia. 1" Type AW dihitung bh 6.00 25,000.00 150,000.00
Jumlah C 10,855,925.00
Bayu Trisona
Wakil Direktur
HARGA PENAWARAN PEKERJAAN
PENGADAAN HURUF LOGO TIMAH MIND ID DI KOLAM SAMPING POS POLISI
PT TIMAH TBK
Bayu Trisona
Wakil Direktur
0
PENGADAAN HURUF LOGO TIMAH MIND ID DI KOLAM SAMPING POS POLISI
PT TIMAH TBK
Jumlah B 23,212,000.00
C Pekerjaan Plumbing instalasi filter air kolam
1 Tabung filter air lengkap aksesoris dihitung set 1.00 2,500,000.00 2,500,000.00
2 Pemasangan pompa kolam dan filter ; lengkap dengan tutup pengaman pompa dihitung unit 2.00 975,000.00 1,950,000.00
3 Memasang 1 m' Pipa PVC Tipe AW Ø 2" M.4 m' 35.00 62,035.00 2,171,225.00
4 Memasang 1 m' Pipa PVC Tipe AW Ø 1" M3 m' 30.00 36,690.00 1,100,700.00
5 Pasang Stopkrane Pipa PVC 2" dihitung bh 3.00 225,000.00 675,000.00
6 Pasang Stopkran Pipa PVC 1" dihitung bh 10.00 95,000.00 950,000.00
7 Fitting reducer pipa 2" ke 1" Type AW dihitung bh 8.00 25,000.00 200,000.00
8 Fitting reducer pipa 1,5" ke 1" Type AW dihitung bh 5.00 23,000.00 115,000.00
9 Tebow pipa PVC Dia. 2" Type AW dihitung bh 12.00 44,000.00 528,000.00
10 Tebow pipa PVC Dia. 1" Type AW dihitung bh 12.00 28,000.00 336,000.00
11 Elbow Pipa PVC Dia. 2" Type AW dihitung bh 6.00 30,000.00 180,000.00
12 Elbow Pipa PVC Dia. 1" Type AW dihitung bh 6.00 25,000.00 150,000.00
Jumlah C 10,855,925.00
2 EL-03A Instalasi Kotak Kontak 1 Phase < 6 meter dengan kabel NYM
Bahan
8 m' Kabel NYM 2 X 2,5 mm² 18,500.00 148,000.00
8 m' Conduit dia 20 mm 7,500.00 60,000.00
3 buah Tee Doos 7,500.00 22,500.00
2 buah One Way Doos 3,000.00 6,000.00
7 buah Sock 1,100.00 7,700.00
6 buah Lasdop 1600 9,600.00
12 buah Paku Beton 500 6,000.00
2 buah Fisher S6 + Sekrup 1,100.00 2,200.00
1 lot Aksesoris Instalasi 8,000.00 8,000.00
Tenaga Kerja
0.3 org/hr Tukang listrik 85,000.00 25,500.00
0.15 org/hr Pekerja 80,000.00 12,000.00
0.02 org/hr Mandor 85,000.00 1,700.00
39,200.00 270,000.00 309,200.00
3 EL-03A Instalasi Kotak Kontak 1 Phase ( 7-11 ) meter dengan kabel NYM
Bahan
11 m' Kabel NYM 3 x 2,5 mm² 20,600.00 226,600.00
11 m' Conduit dia 20 mm 7,500.00 82,500.00
3 buah Tee Doos 7,500.00 22,500.00
2 buah One Way Doos 3,000.00 6,000.00
6 buah Sock 1,100.00 6,600.00
6 buah Lasdop 1600 9,600.00
6 buah Paku Beton 500 3,000.00
2 buah Fisher S6 + Sekrup 1,100.00 2,200.00
1 lot Aksesoris Instalasi 8,000.00 8,000.00
Tenaga Kerja
0.3 org/hr Tukang listrik 85,000.00 25,500.00
0.15 org/hr Pekerja 80,000.00 12,000.00
0.015 org/hr Mandor 85,000.00 1,275.00
38,775.00 367,000.00 405,775.00
REDI PRAYUDI
NIK 20958206
DAFTAR HARGA SATUAN UPAH KERJA
PEKERJAAN ELEKTRIKAL DAN PLUMBING
PEMASANGAN HURUF LOGO TIMAH MIND ID DAN PERBAIKAN KOLAM SAMPING POS POLISI
PT TIMAH Tbk
HARGA/STN
NO. UPAH/BAHAN SATUAN SATUAN
(Rp)
REDI PRAYUDI
DAFTAR HARGA SATUAN UPAH KERJA
PEKERJAAN ELEKTRIKAL DAN PLUMBING
PEMASANGAN HURUF LOGO TIMAH MIND ID DAN PERBAIKAN KOLAM SAMPING POS POLISI
PT TIMAH Tbk
HARGA/STN
NO. UPAH/BAHAN SATUAN SATUAN
(Rp)
NIK 20958206
No. Item Pekerjaan Jumlah Nilai Pekerjaan
1 Air mancur menari 65,000,000.00
2 Pekerjaan perbbaikan kolam 49,950,000.00
3 Logo timah 49,000,000.00
163,950,000.00