HARGA PENAWARAN PEKERJAAN

PEKERJAAN PEMASANGAN AIR MANCUR MENARI

NO ITEM BAHAN / PEKERJAAN SPESIFIKASI STN


Dn 25 stainless steel 304 .fasteners hexagon , high max
1 Direct nozzle 6m 3,6 m3/H 14.00
Dn 25 stainless steel , high max 30 -50cm ,10m3 flow ,
2 Rotary Nozzle 20- 30Cm water distance 2.00
3 Selenoid valve uk 3/4 inch 24vdc uk 3/4 inch 24vdc 3.00
4 Submarsible pump Power 12VDC 5A, 14.00
dmx512 mode , 4wire cable , 12watt, 12Vdc ,lp67 , center
5 Dmx fountain led hole 12.00
Power suplay 12VDC 5A, SSR (solid state relay fotek
6 Driver pump 40DA) 12.00
Ac 0-175-260v 50/60 Hz adjust current 0-10-28,9 A,
7 Transformer Led output power 350 watt 2.00
8 Fountain modul sistem Type DMX sistem, modul relay 24VDC, power 12-24VDC 1.00
9 Instalasi pipa plumbing Pipa pvc 3/4inch, kerangka dudukan fountain, dll 1.00
10 Instalasi kabel dan conduit Nyyhy 3 x 1,5 mm 70.00
11 Instalasi kabel dan conduit Nyyhy 4 x 2,5 100.00
Total

Pangkalpinang,
CV.ANUGRAH M

Bayu Tris
Wakil Dire
AAN
CUR MENARI

VOL HARGA JUMLAH

Pcs 575,000.00 8,050,000.00

Pcs 950,000.00 1,900,000.00


Pcs 650,000.00 1,950,000.00
Pcs 550,000.00 7,700,000.00

Pcs 1,800,000.00 21,600,000.00

Pcs 350,000.00 4,200,000.00

Pcs 750,000.00 1,500,000.00


Pcs 6,000,000.00 6,000,000.00
Paket 3,482,000.00 3,482,000.00
mtr 44,400.00 3,108,000.00
mtr 55,100.00 5,510,000.00
65,000,000.00

Pangkalpinang, Juni 2022


CV.ANUGRAH MIKA UTAMA

Bayu Trisona
Wakil Direktur
HARGA PENAWARAN PEKERJAAN
PEKERJAAN ELEKTRIKAL DAN PLUMBING
PEMASANGAN HURUF LOGO TIMAH MIND ID DAN PERBAIKAN KOLAM SAMPING POS POLISI
PT TIMAH TBK

NO URAIAN PEKERJAAN ANALISA STN VOL HARGA JUMLAH

A Instalasi lampu Logo dan Huruf Timah MIND ID


1 Controllerr DMX512 12 Chanel dihitung unit 1.00 3,632,075.00 3,632,075.00
2 Jasa pasang Huruf dan Logo Timah MIND ID dihitung Paket 1.00 3,000,000.00 3,000,000.00
( bor tembok, baut dinabolt, instalasi, dll )
4 Lampu LED WS2811 module 12VDC dihitung Paket 1.00 3,750,000.00 3,750,000.00
5 Pek. Pasang Kabel NYYHY 4 X 2,5 mm2 dihitung unit 100.00 55,000.00 5,500,000.00
- Pipa Conduit + Accesoris
Jumlah A 15,882,075.00
B Pekerjaan Perbaikan Kolam
1 Pek. Pembersihan dinding Kolam
- Sikat dan skrup dinidng kolam dihitung paket 1.00 3,500,000.00 3,500,000.00
2 Pekerjaan Penambahan Acian / Penambalan kolam bocor
- Area bandar atas air terjun ; plester ulang lantai, acian dihitung paket 1.00 4,500,000.00 4,500,000.00
- Area dinding air terjun ; menutup celah lubang pada dinding, penambahan acian, dihitung paket 1.00 2,500,000.00 2,500,000.00
3 Pengecatan dinding Kolam( batu Alam ) Cat Propan 3 x dihitung m2 148.00 62,000.00 9,176,000.00
4 Pengecatan lantai kolam CAT UPOX / 2 x lapis cat dihitung m2 68.00 52,000.00 3,536,000.00

Jumlah B 23,212,000.00
C Pekerjaan Plumbing instalasi filter air kolam
1 Tabung filter air lengkap aksesoris dihitung set 1.00 2,500,000.00 2,500,000.00
2 Pemasangan pompa kolam dan filter ; lengkap dengan tutup pengaman pompa dihitung unit 2.00 975,000.00 1,950,000.00
3 Memasang 1 m' Pipa PVC Tipe AW Ø 2" M.4 m' 35.00 62,035.00 2,171,225.00
4 Memasang 1 m' Pipa PVC Tipe AW Ø 1" M3 m' 30.00 36,690.00 1,100,700.00
5 Pasang Stopkrane Pipa PVC 2" dihitung bh 3.00 225,000.00 675,000.00
6 Pasang Stopkran Pipa PVC 1" dihitung bh 10.00 95,000.00 950,000.00
7 Fitting reducer pipa 2" ke 1" Type AW dihitung bh 8.00 25,000.00 200,000.00
8 Fitting reducer pipa 1,5" ke 1" Type AW dihitung bh 5.00 23,000.00 115,000.00
9 Tebow pipa PVC Dia. 2" Type AW dihitung bh 12.00 44,000.00 528,000.00
10 Tebow pipa PVC Dia. 1" Type AW dihitung bh 12.00 28,000.00 336,000.00
11 Elbow Pipa PVC Dia. 2" Type AW dihitung bh 6.00 30,000.00 180,000.00
12 Elbow Pipa PVC Dia. 1" Type AW dihitung bh 6.00 25,000.00 150,000.00

Jumlah C 10,855,925.00

JUMLAH TOTAL 49,950,000.00


PEMBULATAN 49,950,000.00

Pangkalpinang, Juni 2022


CV.ANUGRAH MIKA UTAMA

Bayu Trisona
Wakil Direktur
HARGA PENAWARAN PEKERJAAN
PENGADAAN HURUF LOGO TIMAH MIND ID DI KOLAM SAMPING POS POLISI
PT TIMAH TBK

NO URAIAN PEKERJAAN ANALISA STN VOL HARGA JUMLAH

A Huruf & Logo Timah MIND ID Acrylic 3D


1 Pembuatan huruf & Logo Acrylic 3d nyala LED RGB dihitung unit 7.00 7,000,000.00 49,000,000.00
- Tinggi Huruf dan Logo 80 Cm - 160 cm tebal 10cm
- Bahan Acrylic marga cipta tebal 3mm
- Lampu LED Modul RGB
Jumlah A 49,000,000.00

JUMLAH TOTAL 49,000,000.00


PEMBULATAN 49,000,000.00

Pangkalpinang, Juni 2022


CV.ANUGRAH MIKA UTAMA

Bayu Trisona
Wakil Direktur
0
PENGADAAN HURUF LOGO TIMAH MIND ID DI KOLAM SAMPING POS POLISI
PT TIMAH TBK

NO URAIAN PEKERJAAN ANALISA STN VOL HARGA JUMLAH

A Huruf & Logo Timah MIND ID Acrylic 3D


1 Pembuatan huruf & Logo Acrylic 3d nyala LED RGB dihitung unit 7.00 7,000,000.00 49,000,000.00
- Tinggi Huruf dan Logo 80 Cm - 160 cm tebal 10cm
- Bahan Acrylic marga cipta tebal 3mm
- Lampu LED Modul RGB
Jumlah A 49,000,000.00

JUMLAH TOTAL 49,000,000.00


PEMBULATAN 49,000,000.00

Mengetahui Pangkalpinang, Juni 2022


PT TIMAH Tbk PT TIMAH Tbk
Kabid Sarana Prasarana Kabag Listrik Instalasi
dan Fasilitas Umum dan Jaringan

DEVY LESTIAWAN REDI PRAYUDI


NIK 20050511 NIK 20958206
HARGA PENAWARAN PEKERJAAN
PEKERJAAN ELEKTRIKAL DAN PLUMBING
PEMASANGAN HURUF LOGO TIMAH MIND ID DAN PERBAIKAN KOLAM SAMPING POS POLISI
PT TIMAH TBK

NO URAIAN PEKERJAAN ANALISA STN VOL HARGA JUMLAH

A Instalasi lampu Logo dan Huruf Timah MIND ID


1 Controllerr DMX512 12 Chanel dihitung unit 1.00 3,632,075.00 3,632,075.00
2 Jasa pasang Huruf dan Logo Timah MIND ID dihitung Paket 1.00 3,000,000.00 3,000,000.00
( bor tembok, baut dinabolt, instalasi, dll )
4 Lampu LED WS2811 module 12VDC dihitung Paket 1.00 3,750,000.00 3,750,000.00
5 Pek. Pasang Kabel NYYHY 4 X 2,5 mm2 dihitung unit 100.00 55,000.00 5,500,000.00
- Pipa Conduit + Accesoris
Jumlah A 15,882,075.00
B Pekerjaan Perbaikan Kolam
1 Pek. Pembersihan dinding Kolam
- Sikat dan skrup dinidng kolam dihitung paket 1.00 3,500,000.00 3,500,000.00
2 Pekerjaan Penambahan Acian / Penambalan kolam bocor
- Area bandar atas air terjun ; plester ulang lantai, acian dihitung paket 1.00 4,500,000.00 4,500,000.00
- Area dinding air terjun ; menutup celah lubang pada dinding, penambahan acian, dihitung paket 1.00 2,500,000.00 2,500,000.00
3 Pengecatan dinding Kolam( batu Alam ) Cat Propan 3 x dihitung m2 148.00 62,000.00 9,176,000.00
4 Pengecatan lantai kolam CAT UPOX / 2 x lapis cat dihitung m2 68.00 52,000.00 3,536,000.00

Jumlah B 23,212,000.00
C Pekerjaan Plumbing instalasi filter air kolam
1 Tabung filter air lengkap aksesoris dihitung set 1.00 2,500,000.00 2,500,000.00
2 Pemasangan pompa kolam dan filter ; lengkap dengan tutup pengaman pompa dihitung unit 2.00 975,000.00 1,950,000.00
3 Memasang 1 m' Pipa PVC Tipe AW Ø 2" M.4 m' 35.00 62,035.00 2,171,225.00
4 Memasang 1 m' Pipa PVC Tipe AW Ø 1" M3 m' 30.00 36,690.00 1,100,700.00
5 Pasang Stopkrane Pipa PVC 2" dihitung bh 3.00 225,000.00 675,000.00
6 Pasang Stopkran Pipa PVC 1" dihitung bh 10.00 95,000.00 950,000.00
7 Fitting reducer pipa 2" ke 1" Type AW dihitung bh 8.00 25,000.00 200,000.00
8 Fitting reducer pipa 1,5" ke 1" Type AW dihitung bh 5.00 23,000.00 115,000.00
9 Tebow pipa PVC Dia. 2" Type AW dihitung bh 12.00 44,000.00 528,000.00
10 Tebow pipa PVC Dia. 1" Type AW dihitung bh 12.00 28,000.00 336,000.00
11 Elbow Pipa PVC Dia. 2" Type AW dihitung bh 6.00 30,000.00 180,000.00
12 Elbow Pipa PVC Dia. 1" Type AW dihitung bh 6.00 25,000.00 150,000.00

Jumlah C 10,855,925.00

JUMLAH TOTAL 49,950,000.00


PEMBULATAN 49,950,000.00

Mengetahui Pangkalpinang, Juni 2022


PT TIMAH Tbk PT TIMAH Tbk
Kabid Sarana Prasarana Kabag Listrik Instalasi
dan Fasilitas Umum dan Jaringan

DEVY LESTIAWAN REDI PRAYUDI


NIK 20050511 NIK 20958206
HARGA PERKIRAAN SENDIRI
PEKERJAAN ELEKTRIKAL DAN PLUMBING
PEMASANGAN HURUF LOGO TIMAH MIND ID DAN PERBAIKAN KOLAM SAMPING POS POLISI
PT TIMAH TBK

NO URAIAN PEKERJAAN ANALISA STN VOL HARGA JUMLAH

A Huruf & Logo Timah MIND ID Acrylic 3D


1 Pembuatan huruf & Logo Acrylic 3d nyala LED RGB dihitung unit 7.00 7,000,000.00 49,000,000.00
- Tinggi Huruf dan Logo 80 Cm - 110 cm
- Bahan Acrylic marga cipta tebal 3mm
- Lampu LED Modul RGB
2 Controllerr DMX512 12 Chanel dihitung unit 1.00 3,320,000.00 3,320,000.00
3 Jasa pasang Huruf dan Logo Timah MIND ID dihitung Paket 1.00 - 0.00
( bor tembok, baut dinabolt, instalasi, dll )
4 Pek. Pasang Kabel NYYHY 4 X 2,5 mm2 dihitung unit 100.00 55,000.00 5,500,000.00
- Pipa Conduit + Accesoris
Jumlah A 57,820,000.00
B Pekerjaan Perbaikan Kolam
1 Pek. Pembersihan dinding Kolam dihitung paket 1.00 - 0.00
- sikat dan skrup dinidng kolam
1 Pekerjaan Penambahan Acian / Penambalan kolam dihitung Pkt 1.00 1,500,000.00 1,500,000.00
2 Pengecatan dinding Kolam( batu Alam ) Cat Propan 2 x dihitung m2 148.00 85,000.00 12,580,000.00
3 Pengecatan lantai kolam CAT UPOX / 2 x lapis cat dihitung m2 68.00 72,200.00 4,909,600.00
4 Memasang 1 m' Pipa PVC Tipe AW Ø 2" M.4 m' 8.00 90,000.00 720,000.00
5 Pasang Stopkrane Pipa PVC 1" dihitung bh 8.00 120,000.00 960,000.00
6 Fitting reducer pipa 2" ke 1" dihitung bh 8.00 21,000.00 168,000.00
7 Te Bow pipa PVC Dia. 2" Type AW dihitung bh 7.00 17,000.00 119,000.00
8 Elbow Pipa PVC Dia. 1" dihitung bh 6.00 15,000.00 90,000.00
Jumlah B 21,046,600.00

JUMLAH TOTAL 78,866,600.00


PEMBULATAN 78,866,000.00

Mengetahui Pangkalpinang, Juni 2022


PT TIMAH Tbk PT TIMAH Tbk
Kabid Sarana Prasarana Kabag Listrik Instalasi
dan Fasilitas Umum dan Jaringan

DEVY LESTIAWAN REDI PRAYUDI


NIK 20050511 NIK 20958206
ANALISA
PEKERJAAN ELEKTRIKAL DAN PLUMBING
PEMASANGAN HURUF LOGO TIMAH MIND ID DAN PERBAIKAN KOLAM SAMPING POS POLISI
PT TIMAH Tbk

SATUAN UPAH BAHAN JUMLAH


No. ANALISA URAIAN PEKERJAAN
( Rp ) ( Rp ) ( Rp ) ( Rp )

1 EL-01 Instalasi Penerangan < 6 meter dengan kabel NYM


Bahan
6 m' Kabel NYM 2 x 1,5 mm² 15,000.00 90,000.00
6 m' Conduit dia 20 mm 7,500.00 45,000.00
1 buah Tee Doos 7,500.00 7,500.00
2 buah One Way Doos 3,000.00 6,000.00
3 buah Sock 1,100.00 3,300.00
3 buah Klem Pipa 1,100.00 3,300.00
6 buah Lasdop 1,600.00 9,600.00
2 buah Paku Beton 500.00 1,000.00
2 buah Fisher S6 + Sekrup 1,100.00 2,200.00
2 buah Elbow 20 mm 6,000.00 12,000.00
1 lot Aksesoris Instalasi 8,000.00 8,000.00
Tenaga Kerja
0.3 org/hr Tukang listrik 85,000.00 25,500.00
0.15 org/hr Pekerja 80,000.00 12,000.00
0.02 org/hr Mandor 85,000.00 1,700.00
39,200.00 187,900.00 227,100.00

2 EL-03A Instalasi Kotak Kontak 1 Phase < 6 meter dengan kabel NYM
Bahan
8 m' Kabel NYM 2 X 2,5 mm² 18,500.00 148,000.00
8 m' Conduit dia 20 mm 7,500.00 60,000.00
3 buah Tee Doos 7,500.00 22,500.00
2 buah One Way Doos 3,000.00 6,000.00
7 buah Sock 1,100.00 7,700.00
6 buah Lasdop 1600 9,600.00
12 buah Paku Beton 500 6,000.00
2 buah Fisher S6 + Sekrup 1,100.00 2,200.00
1 lot Aksesoris Instalasi 8,000.00 8,000.00
Tenaga Kerja
0.3 org/hr Tukang listrik 85,000.00 25,500.00
0.15 org/hr Pekerja 80,000.00 12,000.00
0.02 org/hr Mandor 85,000.00 1,700.00
39,200.00 270,000.00 309,200.00

3 EL-03A Instalasi Kotak Kontak 1 Phase ( 7-11 ) meter dengan kabel NYM
Bahan
11 m' Kabel NYM 3 x 2,5 mm² 20,600.00 226,600.00
11 m' Conduit dia 20 mm 7,500.00 82,500.00
3 buah Tee Doos 7,500.00 22,500.00
2 buah One Way Doos 3,000.00 6,000.00
6 buah Sock 1,100.00 6,600.00
6 buah Lasdop 1600 9,600.00
6 buah Paku Beton 500 3,000.00
2 buah Fisher S6 + Sekrup 1,100.00 2,200.00
1 lot Aksesoris Instalasi 8,000.00 8,000.00
Tenaga Kerja
0.3 org/hr Tukang listrik 85,000.00 25,500.00
0.15 org/hr Pekerja 80,000.00 12,000.00
0.015 org/hr Mandor 85,000.00 1,275.00
38,775.00 367,000.00 405,775.00

4 EL-07a Saklar Seri / 2 device clipsal


Bahan
1 bh Saklar Seri / 2 device clipsal 40,000.00 40,000.00
1 bh IB / OB Dus 7,500.00 7,500.00
1 lot Aksesoris Armature 0.00 0.00
Tenaga Kerja
0.1 org/hr Tukang listrik 85,000.00 8,500.00
0.06 org/hr Pekerja 80,000.00 4,800.00
0.01 org/hr Mandor 85,000.00 850.00
14,150.00 47,500.00 61,650.00
ANALISA
PEKERJAAN ELEKTRIKAL DAN PLUMBING
PEMASANGAN HURUF LOGO TIMAH MIND ID DAN PERBAIKAN KOLAM SAMPING POS POLISI
PT TIMAH Tbk

SATUAN UPAH BAHAN JUMLAH


No. ANALISA URAIAN PEKERJAAN
( Rp ) ( Rp ) ( Rp ) ( Rp )
5 EL-07e Stop Kontak Clipsal
Bahan
1 bh Stop Kontak Clipsal 45,000.00 45,000.00
1 bh IB / OB Dus 7,500.00 7,500.00
1 lot Aksesoris Armature 0.00 0.00
Tenaga Kerja
0.1 org/hr Tukang listrik 85,000.00 8,500.00
0.06 org/hr Pekerja 80,000.00 4,800.00
0.01 org/hr Mandor 85,000.00 850.00
14,150.00 52,500.00 66,650.00

6 EL-02C Kabel Power NYY Uk. 2 x 2,5mm


Bahan
1 m' Kabel NYY 2 x 2,5 mm² 23,000.00 23,000.00
1 m' Conduit dia 20 mm 7,500.00 7,500.00
1 lot Aksesoris Instalasi 8,000.00 8,000.00
Tenaga Kerja
0.05 org/hr Tukang listrik 85,000.00 4,250.00
0.04 org/hr Pekerja 80,000.00 3,200.00
0.025 org/hr Mandor 85,000.00 2,125.00
9,575.00 38,500.00 48,075.00

7 EL-02Ca Kabel Power NYY Uk. 4 x 2,5mm


Bahan
1 m' Kabel NYY 4 x 2,5 mm² 36,225.00 36,225.00
1 m' Conduit dia 20 mm 7,500.00 7,500.00
1 lot Aksesoris Instalasi 8,000.00 8,000.00
Tenaga Kerja
0.05 org/hr Tukang listrik 85,000.00 4,250.00
0.04 org/hr Pekerja 80,000.00 3,200.00
0.025 org/hr Mandor 85,000.00 2,125.00
9,575.00 51,725.00 61,300.00
8 EL-02D Pek Pasang Kabel NYY 4 x 10 mm
1 m' Kabel NYY 4 x 10 mm² 120,000.00 120,000.00
Tenaga Kerja
0.045 org/hr Tukang listrik 85,000.00 3,825.00
0.045 org/hr Pekerja 80,000.00 3,600.00
0.045 org/hr Mandor 85,000.00 3,825.00
11,250.00 120,000.00 131,250.00

9 PP-05b Pek. Pasang Box MCB 6 Pole Presto


Bahan
1 bh Box MCB 6 Pole Merk Presto 120,000.00 120,000.00
4 bh MCB 6A/10A/16A/20A 1 P, 4,5 kA 85,000.00 340,000.00
Tenaga Kerja
0.3 org/hr Tukang listrik 85,000.00 25,500.00
0.15 org/hr Pekerja 80,000.00 12,000.00
0.02 org/hr Mandor 85,000.00 1,700.00
39,200.00 460,000.00 499,200.00

10 A.5.1.1.25 Memasang 1 m' Pipa PVC Tipe AW Ø 1/2"


M.1 Bahan
1.2 m' Pipa PVC Ø 1/2" 15,000.00 18,000.00
1 Ls Perlengkapan 35% Harga Pipa 5,250.00 5,250.00
tenaga
0.036 Oh Pekerja 80,000.00 2,880.00
0.06 Oh Tukang Batu 85,000.00 5,100.00
0.006 Oh Kepala Tukang 90,000.00 540.00
0.002 Oh Mandor 85,000.00 170.00
8,690.00 23,250.00 31,940.00

11 M.2 Memasang 1 m' Pipa PVC Tipe AW Ø 3/4"


Bahan
1.05 m' Pipa PVC Ø 3/4" 17,000.00 17,850.00
1 Ls Perlengkapan 35% Harga Pipa 5,950.00 5,950.00
ANALISA
PEKERJAAN ELEKTRIKAL DAN PLUMBING
PEMASANGAN HURUF LOGO TIMAH MIND ID DAN PERBAIKAN KOLAM SAMPING POS POLISI
PT TIMAH Tbk

SATUAN UPAH BAHAN JUMLAH


No. ANALISA URAIAN PEKERJAAN
( Rp ) ( Rp ) ( Rp ) ( Rp )
tenaga
0.036 Oh Pekerja 80,000.00 2,880.00
0.06 Oh Tukang Batu 85,000.00 5,100.00
0.006 Oh Kepala Tukang 90,000.00 540.00
0.002 Oh Mandor 85,000.00 170.00
8,690.00 23,800.00 32,490.00

12 M.3 Memasang 1 m' Pipa PVC Tipe AW Ø 1"


Bahan
1.05 m' Pipa PVC Ø 1" 20,000.00 21,000.00
1 Ls Perlengkapan 35% Harga Pipa 7,000.00 7,000.00
tenaga
0.036 Oh Pekerja 80,000.00 2,880.00
0.06 Oh Tukang Batu 85,000.00 5,100.00
0.006 Oh Kepala Tukang 90,000.00 540.00
0.002 Oh Mandor 85,000.00 170.00
8,690.00 28,000.00 36,690.00

13 M.4 Memasang 1 m' Pipa PVC Tipe AW Ø 2"


Bahan
1.05 m' Pipa PVC Ø 2" 35,000.00 36,750.00
1 Ls Perlengkapan 35% Harga Pipa 12,250.00 12,250.00
tenaga
0.054 Oh Pekerja 80,000.00 4,320.00
0.09 Oh Tukang Batu 85,000.00 7,650.00
0.009 Oh Kepala Tukang 90,000.00 810.00
0.003 Oh Mandor 85,000.00 255.00
13,035.00 49,000.00 62,035.00

Pangkalpinang, Juni 2022


PT TIMAH Tbk
Kabag Listrik Instalasi
dan Jaringan

REDI PRAYUDI
NIK 20958206
DAFTAR HARGA SATUAN UPAH KERJA
PEKERJAAN ELEKTRIKAL DAN PLUMBING
PEMASANGAN HURUF LOGO TIMAH MIND ID DAN PERBAIKAN KOLAM SAMPING POS POLISI
PT TIMAH Tbk

HARGA/STN
NO. UPAH/BAHAN SATUAN SATUAN
(Rp)

1 Pekerja Orang/ Hari 80,000.00


2 Mandor Orang/ Hari 85,000.00
3 Tukang kayu,batu, besi, cat, gypsum, las, listrik, aluminiu Orang/ Hari 85,000.00
4 Kepala Tukang Orang/ Hari 90,000.00
NO. BAHAN MERK / TYPE SATUAN HARGA/STN
( Rp)

1 Box MCB 6 Pole Merk Presto Presto pcs 120,000.00


2 MCB 6A/10A/16A/20A 1 P, 4,5 kA Schneider bh 85,000.00
3 Conduit dia 20 mm Clipsal/Ega/Boss mtr 7,500.00
4 Tee Doos Clipsal/Ega/Boss bh 7,500.00
5 One Way Doos Clipsal/Ega/Boss bh 3,000.00
6 Sock pipa20mm Clipsal/Ega/Boss bh 1,100.00
7 Klem pipa 20mm Clipsal/Ega/Boss bh 1,100.00
8 Krustin / Lasdop 4mm clipsal bh 1600
9 Paku Beton Daiken bh 500
10 Fisher S6 + Sekrup bh 1,100.00
11 Elbow 20 mm Legrand/clipsal bh 6,000.00
12 Aksesoris Instalasi lot 8,000.00
13 Aksesoris Armature
14 Saklar tunggal /1 divice clipsal Clipsal bh 30,000.00
15 Saklar Seri / 2 device clipsal Clipsal bh 40,000.00
16 Saklar Triple / 3 device clipsal Clipsal bh 75,000.00
17 Saklar Quarted / 4 device clipsal Clipsal bh 89,000.00
18 Stop Kontak Clipsal Clipsal bh 45,000.00
19 Stop Kontak+Steker AC Panasonic Panasonic bh 90,000.00
20 IB / OB Dus Clipsal bh 7,500.00
21 Aksesoris Armature lot 5,000.00
22 Kabel NYA 1,5mm Supreme m' 4,750.00
23 Kabel NYA 2,5mm Supreme m' 5,600.00
24 Kabel NYY 2 x 2,5 mm² Supreme mtr 23,000.00
25 Kabel NYY 4 x 2,5 mm² Supreme mtr 30,000.00
26 kabel NYY 4 x 10mm Supreme mtr 120,000.00
27 Kabel NYM 2 x 1,5mm Supreme mtr 15,000.00
28 Kabel NYM 2 x 2,5mm Supreme mtr 18,500.00
29 Kabel NYM 3 x 2,5mm Supreme mtr 20,600.00
30 Lampu Led Batten 16w Phillips complite Phillips bh 130,000.00
31 Pipa PVC Ø 1/2" Type AW Rucika m' 15,000.00
32 Pipa PVC Ø 3/4" Type AW Rucika m' 17,000.00
33 Pipa PVC Ø 1" Type AW Rucika m' 20,000.00
34 Pipa PVC Ø 2" Rucika m' 35,000.00

Pangkalpinang, Juni 2022


PT TIMAH Tbk
Kabag Listrik Instalasi
dan Jaringan

REDI PRAYUDI
DAFTAR HARGA SATUAN UPAH KERJA
PEKERJAAN ELEKTRIKAL DAN PLUMBING
PEMASANGAN HURUF LOGO TIMAH MIND ID DAN PERBAIKAN KOLAM SAMPING POS POLISI
PT TIMAH Tbk

HARGA/STN
NO. UPAH/BAHAN SATUAN SATUAN
(Rp)
NIK 20958206
No. Item Pekerjaan Jumlah Nilai Pekerjaan
1 Air mancur menari 65,000,000.00
2 Pekerjaan perbbaikan kolam 49,950,000.00
3 Logo timah 49,000,000.00
163,950,000.00