Paket Pekerjaan : Instalasi Chiller , Cooling Tower dan Instalasi Chilled Water.
Kontraktor Peserta : PT. Sakata Utama
B. Pekerjaan : Instalasi Chiller , Cooling Tower dan Instalasi Chilled Water. 3,377,303,000 906,351,800
6,652,447,000 1,429,630,600
TOTAL
8,082,077,600
ENGINEERING ESTIMASI.
Paket Pekerjaan : Instalasi Chiller , Cooling Tower dan Instalasi Chilled Water.
Kontraktor Peserta : PT. Sakata Utama
Pipa Header mau masuk PHX dari pipa CWR PHX BRUCKNER
ENGINEERING ESTIMASI.
Paket Pekerjaan : Instalasi Chiller , Cooling Tower dan Instalasi Chilled Water.
Kontraktor Peserta : PT. Sakata Utama
1 CHWS Pipa BS Sch.40 dia. 200 mm elv.+5.000 m' 252 669,000 133,800 168,588,000 33,717,600
2 CHWR Pipa BS Sch.40 dia. 200 mm elv.+5.000 m' 252 669,000 133,800 168,588,000 33,717,600
3 2 Way Valve By pass dia. 100 mm bh 1 1,620,000 324,000 1,620,000 324,000
4 Pressure Indicator bh 2 1,406,000 281,200 2,812,000 562,400
5 Butterfly valve drain dia. 50 mm bh 1 1,053,000 210,600 1,053,000 210,600
6 Automatic air Vent + GV. Dia. 50 mm bh 1 1,350,000 270,000 1,350,000 270,000
7 CHWS Pipa BS Sch.40 dia. 150 mm elv.-3.500 area MDO m' 54 435,000 87,000 23,490,000 4,698,000
8 CHWR Pipa BS Sch.40 dia. 150 mm elv.-3.500 area MDO m' 54 435,000 87,000 23,490,000 4,698,000
9 Butterfly valve dia. 150 mm bh 2 3,454,000 690,800 6,908,000 1,381,600
10 2 Way Valve By pass dia. 50 mm bh 1 972,000 194,400 972,000 194,400
11 Pressure Indicator bh 2 1,406,000 281,200 2,812,000 562,400
12 Butterfly valve drain dia. 50 mm bh 1 1,053,000 210,600 1,053,000 210,600
13 Automatic air Vent + GV. Dia. 50 mm bh 1 1,350,000 270,000 1,350,000 270,000
14 CHWS Pipa BS Sch.40 dia. 80 mm elv.-5.000 area Pull Roll m' 30 242,000 48,400 7,260,000 1,452,000
15 CHWR Pipa BS Sch.40 dia. 80 mm elv.-5.000 area Pull Roll m' 30 242,000 48,400 7,260,000 1,452,000
16 Butterfly valve dia. 80 mm bh 3 2,072,000 414,400 6,216,000 1,243,200
17 Fitting - Fitting ls 1 5,529,000 1,105,800 5,529,000 1,105,800
18 Support ls 1 2,765,000 553,000 2,765,000 553,000
ENGINEERING ESTIMASI.
Paket Pekerjaan : Instalasi Chiller , Cooling Tower dan Instalasi Chilled Water.
Kontraktor Peserta : PT. Sakata Utama
Main Line pipa dari Header CHWS & CHWR ke Mesin PHE Utility.
ENGINEERING ESTIMASI.
Paket Pekerjaan : Instalasi Chiller , Cooling Tower dan Instalasi Chilled Water.
Kontraktor Peserta : PT. Sakata Utama
Main Line pipa CWS & CWR dari PHE Bruckner ke Unit unit dan
sebaliknya. Memakai pipa GIP Medium tanpa isolasi armaflex.
1 CWS Pipa BS Sch.40 dia. 125 mm . m' 192 467,000 93,400 89,664,000 17,932,800
2 CWR Pipa BS Sch.40 dia. 125 mm . m' 192 467,000 93,400 89,664,000 17,932,800
3 Butterfly valve dia. 125 mm bh 2 3,398,000 679,600 6,796,000 1,359,200
4 2 Way Valve By pass dia. 50 mm bh 1 1,620,000 324,000 1,620,000 324,000
5 Pressure Indicator bh 2 1,406,000 281,200 2,812,000 562,400
6 Butterfly valve drain dia. 50 mm bh 1 1,053,000 210,600 1,053,000 210,600
7 Automatic air Vent + GV. Dia. 50 mm bh 1 1,350,000 270,000 1,350,000 270,000
8 Fitting - Fitting ls 1 2,928,000 585,600 2,928,000 585,600
9 Support ls 1 1,463,000 292,600 1,463,000 292,600
Pipa Cabang dari Main Line pipa CWS & CWR.
Area Co Extruder 1.
1 CWS Pipa BS Sch.40 dia. 40 mm . m' 36 90,000 18,000 3,240,000 648,000
2 CWR Pipa BS Sch.40 dia. 40 mm . m' 36 90,000 18,000 3,240,000 648,000
3 Butterfly valve dia. 40 mm bh 2 1,243,000 248,600 2,486,000 497,200
4 Fitting - Fitting ls 1 461,000 92,200 461,000 92,200
5 Support ls 1 231,000 46,200 231,000 46,200
Area Co Extruder 2.
1 CWS Pipa BS Sch.40 dia. 32 mm . m' 36 73,000 14,600 2,628,000 525,600
2 CWR Pipa BS Sch.40 dia. 32 mm . m' 36 73,000 14,600 2,628,000 525,600
3 Butterfly valve dia. 32 mm bh 2 1,010,000 202,000 2,020,000 404,000
4 Fitting - Fitting ls 1 461,000 92,200 461,000 92,200
5 Support ls 1 231,000 46,200 231,000 46,200
Area Co Extruder 3.
1 CWS Pipa BS Sch.40 dia. 32 mm . m' 36 73,000 14,600 2,628,000 525,600
2 CWR Pipa BS Sch.40 dia. 32 mm . m' 36 73,000 14,600 2,628,000 525,600
3 Butterfly valve dia. 32 mm bh 2 1,010,000 202,000 2,020,000 404,000
4 Fitting - Fitting ls 1 461,000 92,200 461,000 92,200
5 Support ls 1 231,000 46,200 231,000 46,200
Area Co Extruder 4.
1 CWS Pipa BS Sch.40 dia. 40 mm . m' 36 90,000 18,000 3,240,000 648,000
2 CWR Pipa BS Sch.40 dia. 40 mm . m' 36 90,000 18,000 3,240,000 648,000
3 Butterfly valve dia. 40 mm bh 2 1,243,000 248,600 2,486,000 497,200
4 Fitting - Fitting ls 1 461,000 92,200 461,000 92,200
5 Support ls 1 231,000 46,200 231,000 46,200
Area MDO.
1 CWS Pipa BS Sch.40 dia. 32 mm . m' 6 73,000 14,600 438,000 87,600
2 CWR Pipa BS Sch.40 dia. 32 mm . m' 6 73,000 14,600 438,000 87,600
3 Butterfly valve dia. 32 mm bh 2 1,010,000 202,000 2,020,000 404,000
4 Fitting - Fitting ls 1 461,000 92,200 461,000 92,200
5 Support ls 1 231,000 46,200 231,000 46,200
Area HCU MDO. ( 8 unit )
1 CWS Pipa BS Sch.40 dia. 25 mm . m' 42 56,000 11,200 2,352,000 470,400
2 CWR Pipa BS Sch.40 dia. 25 mm . m' 42 56,000 11,200 2,352,000 470,400
3 Butterfly valve dia. 25 mm bh 16 777,000 155,400 12,432,000 2,486,400
4 Fitting - Fitting ls 1 461,000 92,200 461,000 92,200
5 Support ls 1 231,000 46,200 231,000 46,200
Area Mesin Coating. ( 3 unit )
1 CWS Pipa BS Sch.40 dia. 32 mm . m' 12 73,000 14,600 876,000 175,200
2 CWR Pipa BS Sch.40 dia. 32 mm . m' 18 73,000 14,600 1,314,000 262,800
3 Butterfly valve dia. 32 mm bh 6 1,010,000 202,000 6,060,000 1,212,000
4 Fitting - Fitting ls 1 461,000 92,200 461,000 92,200
5 Support ls 1 231,000 46,200 231,000 46,200
Area TDO. ( TDO in 3 unit ; TDO Out 2 unit )
1 CWS Pipa BS Sch.40 dia. 20 mm . m' 36 56,000 11,200 2,016,000 403,200
2 CWR Pipa BS Sch.40 dia. 20 mm . m' 36 56,000 11,200 2,016,000 403,200
3 Butterfly valve dia. 20 mm bh 10 777,000 155,400 7,770,000 1,554,000
ENGINEERING ESTIMASI.
Paket Pekerjaan : Instalasi Chiller , Cooling Tower dan Instalasi Chilled Water.
Kontraktor Peserta : PT. Sakata Utama
Ruang Control 1.
1 CHWS Pipa BS Sch.40 dia. 20 mm . m' 6 56,000 11,200 336,000 67,200
2 CHWR Pipa BS Sch.40 dia. 20 mm . m' 6 56,000 11,200 336,000 67,200
3 Fitting dan Support ls 1 1,494,000 298,800 1,494,000 298,800
4 Butterfly valve dia. 20 mm bh 2 1,294,000 258,800 2,588,000 517,600
5 Strainner dia. 20 mm bh 1 1,071,000 214,200 1,071,000 214,200
6 Flexible rubber dia.20 mm bh 2 263,000 52,600 526,000 105,200
7 2 way motorized modulating valve dia. 20 mm bh 1 1,620,000 324,000 1,620,000 324,000
8 Temperatur meter bh 2 62,000 12,400 124,000 24,800
9 Pressure gauge bh 2 62,000 12,400 124,000 24,800
10 FCU water cooled unit 1 32,000,000 6,400,000 32,000,000 6,400,000
Kapasitas pendinginan 22.500 BTU/H
Water Flow 1,14 M3/H
Air Flow 565 M3/H
11 Plenum Box PIR Suply 2200 x 800 x 1300 mm set 1 896,000 179,200 896,000 179,200
12 Plenum Box PIR return 2200 x 1200 x 600 mm set 1 896,000 179,200 896,000 179,200
13 Ducting PIR Suply 300 x 200 mm m' 10 448,000 89,600 4,480,000 896,000
14 Ducting PIR Return 300 x 200 mm m' 24 448,000 89,600 10,752,000 2,150,400
15 SAG 300 x 300 mm bh 8 270,000 54,000 2,160,000 432,000
16 RAG 500 x 200 mm bh 6 450,000 90,000 2,700,000 540,000
17 Flexible Duct dia. 8" m' 9 45,000 9,000 405,000 81,000
18 Pipa PVC AW dia. 1" isolation untk drain. ls 1 63,000 12,600 63,000 12,600
Ruang Control 2.
1 CHWS Pipa BS Sch.40 dia. 20 mm . m' 6 56,000 11,200 336,000 67,200
2 CHWR Pipa BS Sch.40 dia. 20 mm . m' 6 56,000 11,200 336,000 67,200
3 Fitting dan Support ls 1 1,494,000 298,800 1,494,000 298,800
4 Butterfly valve dia. 20 mm bh 2 1,294,000 258,800 2,588,000 517,600
5 Strainner dia. 20 mm bh 1 1,071,000 214,200 1,071,000 214,200
6 Flexible rubber dia.20 mm bh 2 263,000 52,600 526,000 105,200
7 2 way motorized modulating valve dia. 20 mm bh 1 1,620,000 324,000 1,620,000 324,000
8 Temperatur meter bh 2 62,000 12,400 124,000 24,800
9 Pressure gauge bh 2 62,000 12,400 124,000 24,800
10 FCU water cooled unit 1 32,000,000 6,400,000 32,000,000 6,400,000
Kapasitas pendinginan 11.300 BTU/H
Water Flow 0,58 M3/H
Air Flow 418 M3/H
11 Plenum Box PIR Suply 2200 x 800 x 1300 mm set 1 896,000 179,200 896,000 179,200
12 Plenum Box PIR return 2200 x 1200 x 600 mm set 1 896,000 179,200 896,000 179,200
13 Ducting PIR Suply 300 x 200 mm m' 4 448,000 89,600 1,792,000 358,400
ENGINEERING ESTIMASI.
Paket Pekerjaan : Instalasi Chiller , Cooling Tower dan Instalasi Chilled Water.
Kontraktor Peserta : PT. Sakata Utama
TOTAL
ENGINEERING ESTIMASI.
Paket Pekerjaan : Instalasi Chiller , Cooling Tower dan Instalasi Chilled Water.
Kontraktor Peserta : PT. Sakata Utama
Pengadaan dan Pemasangan Instalasi Ducting Ventilasi Fin. Primecoat & Cat
A. Finishing Jotun Orange
1 AHU Kapasitas. 100.00 CMH Static Pressure : 630 Pa unit 4 509,000,000 25,450,000 2,036,000,000 101,800,000
2 Plenum Box supply 2.2 x 3 x 15 meter, BJLS 120 set 1 896,000 179,200 896,000 179,200
3 Plenum box Isap + pre filter + medium filter 3 x 3 x 2,5 mtr, BJLS 120. ser 3 896,000 179,200 2,688,000 537,600
4 Ducting Suply keluar box Plenum 2.0 x 2.4 mtr, BJLS 120 m' 55 55,000 11,000 3,025,000 605,000
5 Ducting Suply keluar box Plenum 2.0 x 1.8 mtr, BJLS 120 m' 50 55,000 11,000 2,750,000 550,000
6 Ducting Suply 1.8 x 0.8 mtr, BJLS 100 m' 59 48,000 9,600 2,832,000 566,400
7 Ducting Suply 1.2 x 1.8 mtr, BJLS 100 m' 22 48,000 9,600 1,056,000 211,200
8 Ducting Suply turun 0,6 x 0.5 mtr, BJLS 100 m' 130 48,000 9,600 6,240,000 1,248,000
9 SAG 900x500 mm bh 26 518,000 103,600 13,468,000 2,693,600
10 Support ls 1 771,000 154,200 771,000 154,200
AHU kap. 100.000 CMH + AHU Existing unit 1 509,000,000 25,450,000 509,000,000 25,450,000
11 Plenum Box supply 2.7 x 1.6 x 4.5 meter, BJLS 120 set 1 896,000 179,200 896,000 179,200
12 Plenum box Isap + pre filter + medium filter 3 x 3 x 2,5 mtr, BJLS 120. set 1 896,000 179,200 896,000 179,200
13 Ducting Suply 1.2 x 1.6 mtr BJLS 100 m' 145 48,000 9,600 6,960,000 1,392,000
14 Ducting Suply turun 0,6 x 0.5 mtr, BJLS 100 m' 105 48,000 9,600 5,040,000 1,008,000
15 SAG 900x500 mm bh 23 518,000 103,600 11,914,000 2,382,800
16 Support ls 1 771,000 154,200 771,000 154,200
Dust Collector.
1 Duct BJLS dia. 300 mm m' 25 309,000 61,800 7,725,000 1,545,000
Exhaust Air from Cyclone above main extruder and indoor siloss ( for
resin conveying and edge trim )
1 Fan Cap. 4.000 CMH 1 by Bruckner
2 Ducting BJLS dia. 450 mm m' 22 338,000 67,600 7,436,000 1,487,200
3 Support ls 1 1,519,000 303,800 1,519,000 303,800
Preheating/Stretching/Annealing TDO
1 Fan Cap. 15.000 CMH 1 by Bruckner
2 Ducting BJLS dia. 900 mm m' 23 939,000 187,800 21,597,000 4,319,400
3 Support ls 1 1,519,000 303,800 1,519,000 303,800
SLITER.
1 Fan Cap. 14.400 CMH unit 4 9,000,000 1,800,000 36,000,000 7,200,000
2 Support ls 1 1,519,000 303,800 1,519,000 303,800
NGR ROOM
1 Propeler Fan Exhaust NGR & Balling Press Room, 10.000 CMH, Sp. 200 Pa. unit 5 7,000,000 1,400,000 35,000,000 7,000,000
2 Support ls 1 1,519,000 303,800 1,519,000 303,800
Sub Jumlah Pengadaan dan Pemasangan Instalasi Ducting Ventilasi. 3,275,144,000 523,278,800
TOTAL