Anda di halaman 1dari 46

BILL OF QUANTITY (BOQ)

ANGGARAN BIAYA PEMBANGUNAN GEDUNG JURUSAN PETERNAKAN


POLITEKNIK NEGERI JEMBER
TAHUN ANGGARAN 2020-2021

VII. REKAPITULASI PEKERJAAN MEKANIKAL DAN ELEKTRIKAL


TOTAL
NO. DESCRIPTION
( in Rp )
a b c

I. ELEKTRIKAL DAN ELEKTRONIKA


1.A PEKERJAAN PANEL -
1.B PEKERJAAN INSTALASI PENERANGAN DAN PROTEKSI -
1.C PEKERJAAN SISTEM INTEGRASI (TRIPLE PLAY) ( IP CCTV, IP TELEPON, DATA) -
1.D FIRE ALARM -
1.E PUBLIC ADDRESS & GENERAL ANNOUNCEMENT -
1.F PROYEKTOR -
1.H. INSTALASI POWER HOUSE -
1.i PENYAMBUNGAN DAYA -

SUBTOTAL ELEKTRIKAL DAN ELEKTRONIKA -

II. MEKANIKAL
2.A PEKERJAAN INSTALASI AIR BERSIH -
2.B PEKERJAAN INSTALASI AIR KOTOR -
2.C PEKERJAAN INSTALASI AIR BEKAS -
2.D PEKERJAAN INSTALASI AIR HUJAN -
2.E PEKERJAAN INSTALASI PEMADAM KEBAKARAN -
2.F PEKERJAAN TATA UDARA -
2.G PEKERJAAN LIFT -
2.H PEKERJAAN INSTALASI RUMAH POMPA -
2.I PEKERJAAN SISTEM PEMADAM KEBAKARAN -
2.J PEKERJAAN DEEP WELL -

SUBTOTAL PEKERJAAN MEKANIKAL -

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 1 of 46


TOTAL MECHANICAL, ELECTRICAL & ELECTRONIC -

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 2 of 46


BILL OF QUANTITY (BOQ)
ANGGARAN BIAYA PEMBANGUNAN GEDUNG JURUSAN PETERNAKAN
POLITEKNIK NEGERI JEMBER
TAHUN ANGGARAN 2020-2021

VIA. PEKERJAAN ELEKTRIKAL


HARGA SAT. TOTAL HARGA
NO. URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )

A ELECTRICAL

A.1 DISTRIBUTION BOARD PANEL & POWER CABEL

A.1.1 1ST FLOOR


1 SDP. Building unit 1 - -
2 PP.1 unit 1 - -
3 LP. Taman unit 1 - -
4 PP. LAB 1/1 unit 1 - -
5 PP. LAB 1/2 unit 1 - -
6 PP. AC. 1 unit 1 - -
7 PP. RME unit 1 - -
8 PC. Lift unit 1 - -
9 PC. Transfer Pump unit 1 - -

A.1.2 2ND FLOOR


1 PP.2 unit 1 - -
2 PP. LAB 2/1 unit 1 - -
3 PP. LAB 2/2 unit 1 - -
4 PP. LAB 2/3 unit 1 - -
5 PP. LAB 2/4 unit 1 - -
6 PP. AC. 2 unit 1 - -
7 PP. Tangga unit 1 - -

A.1.3 3RD FLOOR


1 PP.3 unit 1 - -
2 PP. AC. 3 unit 1 - -

A.1.4 4th FLOOR


1 PP.4 unit 1 - -
2 PP. AC. 4 unit 1 - -

A.1.5 5th FLOOR


1 PP. 5 unit 1 - -
2 PP. AC. 5 unit 1 - -

A.1.6 Top FLOOR


1 PC. Booster Pump unit 1 - -

A.2 CABLE FEEDER INSTALLATION


A.2.1 Cable feeder instalation from SDP Building to :
1 PP. 1 NYY 4 x 35 mm² m 6 - -
2 PP. 2 NYY 4 x 35 mm² m 10 - -
3 PP. 3 NYY 4 x 35 mm² m 16 - -
4 PP. 4 NYY 4 x 35 mm² m 22 - -
5 PP. 5 NYY 4 x 35 mm² m 28 - -
6 PP. AC. 1 NYY 4 x 50 mm² m 6 - -
7 PP. AC. 2 NYY 4 x 50 mm² m 10 - -
8 PP. AC. 3 NYY 4 x 50 mm² m 16 - -
9 PP. AC. 4 NYY 4 x 50 mm² m 22 - -
10 PP. AC. 5 NYY 4 x 50 mm² m 28 - -
11 PP. LAB 1/1 NYY 4 x 35 mm² m 32 - -
12 PP. LAB 1/2 NYY 4 x 35 mm² m 42 - -
13 PP. LAB 2/1 NYY 4 x 35 mm² m 22 - -
14 PP. LAB 2/2 NYY 4 x 35 mm² m 26 - -
15 PP. LAB 2/3 NYY 4 x 35 mm² m 32 - -
16 PP. LAB 2/4 NYY 4 x 35 mm² m 39 - -
17 PP. Tangga NYY 4 x 6 mm² m 14 - -
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 3 of 46
HARGA SAT. TOTAL HARGA
NO. URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )
18 PP. RME NYY 4 x 35 mm² m 6 - -
19 PD. Transfer Pump NYY 4 x 10 mm² m 20 - -
20 PP. BOOSTER PUMP NYY 4 x 4 mm² m 25 - -
21 PD. STP NYY 4 x 4 mm² m 12 - -

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 4 of 46


HARGA SAT. TOTAL HARGA
NO. URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )
A.3 CABLE LADDER, CABLE TRAY, FLOOR DUCT INSTALATION

1 Cable Ladder in shaft & 1st floor


- 800 mm x 100 mm x 2 mm Electrical shaft m 20 - -
- 600 mm x 100 mm x 2 mm Electronic shaft m 20 - -
- 700 mm x 100 mm x 2 mm 1st floor to power house m 28 - -

2 1st Floor CableTray


Electrical Ladder
- 400 mm x 50 mm x 2 mm m 67 - -
- 300 mm x 50 mm x 2 mm m 24 - -
Electronic Tray
- 100 mm x 50 mm x 2 mm m 65 - -

3 2nd Floor CableTray


Electrical Ladder
- 400 mm x 50 mm x 2 mm m 67 - -
- 300 mm x 50 mm x 2 mm m 24 - -
Electronic Tray
- 100 mm x 50 mm x 2 mm m 65 - -

4 3rd Floor CableTray


Electrical Ladder
- 400 mm x 50 mm x 2 mm m 67 - -
- 300 mm x 50 mm x 2 mm m 24 - -
Electronic Tray
- 100 mm x 50 mm x 2 mm m 65 - -

5 4th Floor CableTray


Electrical Ladder
- 400 mm x 50 mm x 2 mm m 67 - -
- 300 mm x 50 mm x 2 mm m 24 - -
Electronic Tray
- 100 mm x 50 mm x 2 mm m 65 - -

6 5th Floor CableTray


Electrical Ladder
- 400 mm x 50 mm x 2 mm m 67 - -
- 300 mm x 50 mm x 2 mm m 24 - -
Electronic Tray
- 100 mm x 50 mm x 2 mm m 65 - -

A.4 GROUNDING INSTALLATION ELECTRIC SYSTEM


1 BCC 4 mm² m 65 - -
2 BCC 6 mm² m 65 - -
3 BCC 16 mm2 m 180 - -
4 BCC 25 mm² m 65 - -
5 NYA 1 x 70 mm2 m 17 - -
6 Grounding Installation Panel TR (Resistansi Max 5 Ohm) Lot 6 - -
- Copper Rod dia 5/8 "
- Excavation & Backfilling
- Box Control 400 X 400 X 400 mm3
- Terminal Busbar 150x100x15 mm3

A.5 UPS INSTALATION in Control room


UPS instalation. Online type, double conversion
(Back Up Time 30 menit)
1 UPS 10KVA / 3 PH unit 1 - -
2 Cabeling & Accessories lot 1 - -

A.6 TESTING & COMMISSIONING ELECTRICAL INSTALATION


Continiue, Megger, Grounding & Function Test - EL Lot 1 - -

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 5 of 46


HARGA SAT. TOTAL HARGA
NO. URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )

( 1.A ) = TOTAL INSTALLATION PANEL -

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 6 of 46


HARGA SAT. TOTAL HARGA
NO. URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )
B.1 ARMATURE, CABELING, LIGHTENING PROTECTION

B.1.1 Parking Area


Lighting Fixtures & Installation
1 GL Pillar Mini Cesna LED 8 W unit 22 - -
2 GL PC LED 8 W unit 4 - -
3 Installation Cable NYM 3 x 2.5 mm² for Lamp point 26 - -
4 Cable Loop NYFGBY 4 x 4 mm² m 190 - -
5 Excavation & Back Filling m 165 - -

B.1.2 1ST FLOOR & MEZZANINE


Lighting Fixtures & Installation
1 V SHAPE MIRROR LED 2X19 W pcs 29 - -
2 V SHAPE MIRROR LED 1X19 W pcs 49 - -
3 Industrial Light I SQ HPL-N 125 W pcs 18 - -
4 Tuba Up Down LED 19 W pcs 6 - -
5 SM D 150 10 W pcs 14 - -
6 Downlight RD 100 LED 5 W pcs 5 - -
7 SCB ACR LED 10 W pcs 3 - -
8 Installation Cable NYM 3 x 2.5 mm² for Lamp point 124 - -
9 Lighting Accessories, Hanger Support, Tray Cable 150x5 mm for armature supporting lot 1 - -
Switch Fixtures & Installation
1 Double Switch pcs 11 - -
2 Single Switch pcs 16 - -
Socket Outlet Fixtures & Installation
1 Socket Outlet 200 VA (10A) 1 Phasa Type Wall pcs 35 - -
2 Socket Outlet 450 VA pcs 8 - -
3 Installation Cable NYM 3 x 2.5 mm² for Socket Outlet 200 VA point 43 - -
4 Continiue, Megger, Grounding & Function Test - EL lot 1 - -

B.1.3 2nd FLOOR


Lighting Fixtures & Installation
1 V SHAPE MIRROR LED 2X19 W pcs 144 - -
2 V SHAPE MIRROR LED 1X19 W pcs 41 - -
3 V SHAPE MIRROR LED 1X19 W + Battery pcs 2 - -
4 RM 300 LED 2x19 W (Gloss M4) pcs 4 - -
5 Downlight RD 100 LED 5 W pcs 8 - -
6 SCB ACR LED 10 W pcs 6 - -
7 Flood Light 125 W pcs 6 - -
8 Exit LED 8 W + Battery pcs 2 - -
9 Installation Cable NYM 3 x 2.5 mm² for Lamp point 213 - -
10 Lighting Accessories, Hanger Support, Tray Cable 150x5 mm for armature supporting lot 1 - -
Switch Fixtures & Installation
1 Double Switch pcs 5 - -
2 Single Switch pcs 38 - -
Socket Outlet Fixtures & Installation
1 Socket Outlet 200 VA (10A) 1 Phasa Type Wall pcs 45 - -
2 Socket Outlet 450 VA pcs 12 - -
3 Installation Cable NYM 3 x 2.5 mm² for Socket Outlet 200 VA point 57 - -
4 Continiue, Megger, Grounding & Function Test - EL lot 1 - -

B.1.4 3rd FLOOR


Lighting Fixtures & Installation
1 RM 300 LED 2x19 W ACR pcs 18 - -
2 V SHAPE MIRROR LED 1X19 W pcs 27 - -
3 V SHAPE MIRROR LED 1X19 W + Battery pcs 2 - -
4 RM 300 LED 2x19 W (Gloss M4) pcs 62 - -
5 Downlight RD 100 LED 5 W pcs 14 - -
6 SCB ACR LED 10 W pcs 12 - -
7 Exit LED 8 W + Battery pcs 2 - -
8 Installation Cable NYM 3 x 2.5 mm² for Lamp point 137 - -
9 Lighting Accessories, Hanger Support, Tray Cable 150x5 mm for armature supporting lot 1 - -
Switch Fixtures & Installation
1 Double Switch pcs 14 - -
2 Single Switch pcs 29 - -
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 7 of 46
HARGA SAT. TOTAL HARGA
NO. URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )
Socket Outlet Fixtures & Installation
1 Socket Outlet 200 VA (10A) 1 Phasa Type Wall pcs 66 - -
2 Socket Outlet 450 VA pcs 18 - -
3 Installation Cable NYM 3 x 2.5 mm² for Socket Outlet 200 VA point 84 - -
4 Continiue, Megger, Grounding & Function Test - EL lot 1 - -

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 8 of 46


HARGA SAT. TOTAL HARGA
NO. URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )
B.1.5 4th FLOOR
Lighting Fixtures & Installation
1 V SHAPE MIRROR LED 2X19 W pcs 111 - -
2 V SHAPE MIRROR LED 1X19 W pcs 39 - -
3 V SHAPE MIRROR LED 1X19 W + Battery pcs 2 - -
4 Downlight RD 100 LED 5 W pcs 14 - -
5 SCB ACR LED 10 W pcs 6 - -
6 Exit LED 8 W + Battery pcs 2 - -
7 Installation Cable NYM 3 x 2.5 mm² for Lamp point 174 - -
8 Lighting Accessories, Hanger Support, Tray Cable 150x5 mm for armature supporting lot 1 - -
Switch Fixtures & Installation
1 Double Switch pcs 4 - -
2 Single Switch pcs 38 - -
Socket Outlet Fixtures & Installation
1 Socket Outlet 200 VA (10A) 1 Phasa Type Wall pcs 35 - -
2 Socket Outlet 450 VA pcs 2 - -
3 Socket Outlet Type floor pcs 17 -
4 Installation Cable NYM 3 x 2.5 mm² for Socket Outlet 200 VA point 54 - -
5 Continiue, Megger, Grounding & Function Test - EL lot 1 - -

B.1.6 5th FLOOR


Lighting Fixtures & Installation
1 V SHAPE MIRROR LED 2X19 W pcs 111 - -
2 V SHAPE MIRROR LED 1X19 W pcs 39 - -
3 V SHAPE MIRROR LED 1X19 W + Battery pcs 2 - -
4 Downlight RD 100 LED 5 W pcs 14 - -
5 SCB ACR LED 10 W pcs 6 - -
6 Exit LED 8 W + Battery pcs 2 - -
7 Installation Cable NYM 3 x 2.5 mm² for Lamp point 174 - -
8 Lighting Accessories, Hanger Support, Tray Cable 150x5 mm for armature supporting lot 1 - -
Switch Fixtures & Installation
1 Double Switch pcs 4 - -
2 Single Switch pcs 38 - -
Socket Outlet Fixtures & Installation
1 Socket Outlet 200 VA (10A) 1 Phasa Type Wall pcs 62 - -
2 Socket Outlet 450 VA pcs 0 - -
3 Installation Cable NYM 3 x 2.5 mm² for Socket Outlet 200 VA point 62 - -
4 Continiue, Megger, Grounding & Function Test - EL lot 1 - -

B.1.7 Top FLOOR


Lighting Fixtures & Installation
1 V SHAPE MIRROR LED 1X19 W pcs 3 - -
2 V SHAPE MIRROR LED 1X19 W + Battery pcs 3 - -
3 Flood Light 125 W pcs 4 - -
4 Installation Cable NYM 3 x 2.5 mm² for Lamp point 10 - -
5 Lighting Accessories, Hanger Support, etc lot 1 - -
Switch Fixtures & Installation
1 Double Switch pcs 4 - -
2 Single Switch pcs 2 - -
Socket Outlet Fixtures & Installation
1 Socket Outlet 200 VA (10A) 1 Phasa Type Wall pcs 2 - -
2 Installation Cable NYM 3 x 2.5 mm² for Socket Outlet 200 VA point 2 - -
3 Continiue, Megger, Grounding & Function Test - EL lot 1 - -

B.2 LIGHTNING PROTECTION INSTALATION


1 Air Terminal type electrostatic ( GUARDIAN, THOMAS) radius 100 meter pcs 1 - -
2 Grounding (Electroda & plat tembaga, resistansi max 2 Ohm) Include box control lot 1 - -
3 FR-P Mast - 2M dan Counter Strike pcs 1 - -
4 Obstruction Light pcs 1 - -
5 NYXSY 70 mm2 m 90 - -
6 Tiang penyangga lot 1 - -
7 Support material lot 1 - -
8 Perijinan lot 1 - -

B.3 TESTING & COMMISSIONING ELECTRICAL INSTALLATION


PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 9 of 46
HARGA SAT. TOTAL HARGA
NO. URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )
Continue, Megger, Grounding & Function Test - EL Lot 1 - -

( 1.B ) = TOTAL ELECTRICAL ARMATURE & LIGHTNING PROTECTION INSTALATON -

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 10 of 46


HARGA SAT. TOTAL HARGA
NO. URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )

C INTEGRATION SYSTEM (TRIPLE PLAY) ( IP CCTV, IP TELEPON, DATA)

C.1 MAIN EQUIPMENT


1 Optical Line Terminal (Cap. 4 PON Interface) unit 1 - -
2 POS 1 : 16 unit 1 - -
CCTV System :
- Multi Channel Video Server unit 1 - -
- Control Keyboard unit 1 - -
- LED Monitor 42" unit 3 - -
- Alarm Printer unit 1 - -
- Report Printer unit 1 - -
- Patch Panel Data 16 Port + 16 RJ45 Module (incl Cat6 Patch Cable) unit 1 - -
3 Telepon System :
IP PABX (Panasonic, NEC, Alcatel) unit 1 - -
~ 64-channel Voip DSP card unit 1 - -
~ 8 channel IP Propriety tlpn Activation Key unit 1 - -
~ 16 channel SIP Extention Activation Key unit 1 - -
~ Ext Digital u/ Operator unit 1 - -
~ Ext Digital telephone unit 1 - -
~ Auto Attendant (Mesin Penjawab) unit 1 - -
~ Programming & Test Commisioning lot 1 - -
4 Server System
- 19" Rack 42 U unit 1 - -
- Wire Management unit 6 - -
- Managed Switch unit 1 - -
- CCTV Server + Software unit 1 - -
- Integrasi Server + Software unit 1 - -
- Network Advance Storage (NAS) 5 TR unit 1 - -
5 Cabeling in control room include accessories unit 1 - -

C.2 SYSTEM INTEGRATION INSTALATION

C.2.1 1st Floor & Mezzanine


1 ONU Box Panel unit 1 - -
2 Kabel F.O SM 2 Core dari POS Lt.1 ke ONU box panel m 10 - -
3 Terminasi Pcs 8 - -
4 ONU 48 FE + 1 RF unit 1 - -
5 Instalasi kabel UTP Cable Cat 6 dalam PVC Conduit Ø 20mm ke outlet data Point 9 - -
6 Instalasi kabel UTP Cable Cat 6 + Power dalam PVC Conduit Ø 20mm ke outlet CCTV Point 5 - -
7 Instalasi kabel UTP Cable Cat 6 dalam PVC Conduit Ø 20mm ke outlet Wi-Fi Point 3 - -
8 Instalasi kabel UTP Cable Cat 6 dalam PVC Conduit Ø 20mm ke outlet IP Telepon Point 3 - -
9 Telephone Outlet RJ 45 Pcs 3 - -
10 Data Outlet RJ 45 Pcs 9 - -
11 CCTV Outlet RJ 45 Pcs 5 - -
12 Wi-Fi outlet Pcs 3 - -
13 IP Telephone Handset unit 3 - -
14 IP Indoor Fixed Dome Camera unit 5 - -
15 Wireless Acces Point unit 3 - -

C.2.2 2nd Floor


1 Instalasi kabel UTP Cable Cat 6 dalam PVC Conduit Ø 20mm ke outlet data Point 12 - -
2 Instalasi kabel UTP Cable Cat 6 + Power dalam PVC Conduit Ø 20mm ke outlet CCTV Point 4 - -
3 Instalasi kabel UTP Cable Cat 6 dalam PVC Conduit Ø 20mm ke outlet Wi-Fi Point 2 - -
4 Instalasi kabel UTP Cable Cat 6 dalam PVC Conduit Ø 20mm ke outlet IP Telepon Point 6 - -
5 Telephone Outlet RJ 45 Pcs 6 - -
6 Data Outlet RJ 45 Pcs 12 - -
7 CCTV Outlet RJ 45 Pcs 4 - -
8 Wi-Fi outlet Pcs 2 - -
9 IP Telephone Handset unit 6 - -
10 IP Indoor Fixed Dome Camera unit 4 - -
11 Wireless Acces Point unit 2 - -

C.2.3 3rd Floor


1 ONU Box Panel unit 1 - -
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 11 of 46
HARGA SAT. TOTAL HARGA
NO. URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )
2 Kabel F.O SM 2 Core dari POS Lt.1 ke ONU box panel m 56 - -
3 Terminasi Pcs 8 - -
4 ONU 48 FE + 1 RF unit 2 - -
5 Instalasi kabel UTP Cable Cat 6 dalam PVC Conduit Ø 20mm ke outlet data Point 16 - -
6 Instalasi kabel UTP Cable Cat 6 + Power dalam PVC Conduit Ø 20mm ke outlet CCTV Point 4 - -

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 12 of 46


HARGA SAT. TOTAL HARGA
NO. URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )
7 Instalasi kabel UTP Cable Cat 6 dalam PVC Conduit Ø 20mm ke outlet Wi-Fi Point 4 - -
8 Instalasi kabel UTP Cable Cat 6 dalam PVC Conduit Ø 20mm ke outlet IP Telepon Point 16 - -
9 Telephone Outlet RJ 45 Pcs 16 - -
10 Data Outlet RJ 45 Pcs 16 - -
11 CCTV Outlet RJ 45 Pcs 4 - -
12 Wi-Fi outlet Pcs 4 - -
13 IP Telephone Handset unit 16 - -
14 IP Indoor Fixed Dome Camera unit 4 - -
15 Wireless Acces Point unit 4 - -

C.2.4 4th Floor


1 Instalasi kabel UTP Cable Cat 6 dalam PVC Conduit Ø 20mm ke outlet data Point 3 - -
2 Instalasi kabel UTP Cable Cat 6 + Power dalam PVC Conduit Ø 20mm ke outlet CCTV Point 4 - -
3 Instalasi kabel UTP Cable Cat 6 dalam PVC Conduit Ø 20mm ke outlet Wi-Fi Point 2 - -
4 Instalasi kabel UTP Cable Cat 6 dalam PVC Conduit Ø 20mm ke outlet IP Telepon Point 2 - -
5 Telephone Outlet RJ 45 Pcs 2 - -
6 Data Outlet RJ 45 Pcs 3 - -
7 CCTV Outlet RJ 45 Pcs 4 - -
8 Wi-Fi outlet Pcs 2 - -
9 IP Telephone Handset unit 2 - -
10 IP Indoor Fixed Dome Camera unit 4 - -
11 Wireless Acces Point unit 2 - -

C.2.5 5th Floor


1 Instalasi kabel UTP Cable Cat 6 + Power dalam PVC Conduit Ø 20mm ke outlet CCTV Point 4 - -
2 Instalasi kabel UTP Cable Cat 6 dalam PVC Conduit Ø 20mm ke outlet Wi-Fi Point 2 - -
3 CCTV Outlet RJ 45 Pcs 4 - -
4 Wi-Fi outlet Pcs 2 - -
5 IP Indoor Fixed Dome Camera unit 4 - -
6 Wireless Acces Point unit 2 - -

C.3 TESTING & COMMISIONING lot 1 - -

( 1.C ) = TOTAL INSTALATION INTEGRATION SYSTEM -

D FIRE ALARM SYSTEM

D.1 MAIN EQUIPMENT


1 MCFA ( Master Control Fire Alarm ) termasuk Repeat Panel, Nicad Battery + Char unit 1 - -
Kapasitas : 1 loops
Type : Full Addressable
Termasuk CPU dan Monitor LCD 17 ", Printer + Software lengkap dgn Rectifier,
terpasang sesuai gambar dan RKS
2 Power Supply 220 V / 1 Ph / 50 Hz lengkap Arrester dan pengkabelannya unit 1 - -
3 LCD Announciator unit 1 - -
4 Main Distribution Fire Alarm (MDFA) unit 1 - -
5 Main Bell unit 1 - -
6 Main Red Lamp unit 1 - -
7 Module- module :
- Power Supply 220 V / 1 Ph / 50 Hz lengkap Arrester unit 1 - -
- LCD Announciator unit 1 - -
- Main Distribution Fire Alarm (MDFA) unit 1 - -
- Main Bell unit 1 - -
- Main Red Lamp unit 1 - -
- Addressable Control Module for Horn & Stobe unit 12 - -
- Addressable Monitor Module for Manual call point / break glass unit 12 - -
- Addressable Control Module to Pressurized Fan unit 2 - -
- Addressable Control Module to P. Lift lift Scoope -
- Addressable Control Module to P. Pemadam Kebakaran unit 1 - -
- Addressable Control Module to P. Sound System unit 1 - -
- Addressable Control Module to WLC (Plumbing) unit 1 - -
- Addressable Control Module to PDTR unit 1 - -
- Addressable Mini Module (2 input) for Flow Switch / BCV unit 12 - -
- Addressable Relay Module for P. AC AC Scoope -
- Addressable Monitor Module for Detector unit 12 - -
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 13 of 46
HARGA SAT. TOTAL HARGA
NO. URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )
8 Instalasi Peralatan Utama unit 1 - -

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 14 of 46


HARGA SAT. TOTAL HARGA
NO. URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )
D.2 KABEL
1 Kabel STP AWG # 18 dari MDFA ke TB FA (Loops) in conduit PVC HI dia.20mm m 176 - -
2 Kabel ITC 2 x dia. 0,6 mm dari MDF.FA ke TB. FA in conduit PVC HI dia. 20 mm m 119 - -
3 Kabel NYA 2 x 1,5 mm2 dari MDFA TB.FA in conduit PVC HI dia. 20 mm m 119 - -
4 Kabel NYA 3 x 1,5 mm2 untuk kabel Power TB.FA in conduit PVC HI dia. 20 mm m 119 - -
5 Kabel NYA 3 x 1,5 mm2 dari MCFA ke Sound System in conduit PVC HI dia. 20 m m 20 - -
6 Kabel NYA 3 x 1,5 mm2 dari MCFA ke PDTR in conduit PVC HI dia. 20 mm m 60 - -
7 Kabel NYA 3x 1,5 mm2 dari MCFA ke Fire Fighting in conduit PVC HI dia. 20 mm m 65 - -
8 Kabel STP #18 2 pair + NYA 2 x 1,5 mm2 dari MCFA to Annunciator in conduit m 35 - -

D.3 FIRE ALARM INSTALATION IN BUILDING


D.3. 1 1st Floor & Mezzanine
1 Terminal Box (TBFA-1) set 1 - -
2 Horn and Strobe pcs 2 - -
3 Manual Break Glass pcs 2 - -
4 Rate of Rise Heat Detector Addresible pcs 5 - -
5 Smoke Detector Addressable pcs 1 - -
6 Fixed Heat Detector Addressable pcs 1 - -
7 Telephone Jack pcs 2 - -
8 Instalation Detector Addressable dengan kabel STP AWG #18 point 7 - -
in conduit PVC HI dia. 20 mm
9 Instalation Horn & Strobe dengan Kabel NYA 3 x 1,5 mm2 point 2 - -
in conduit PVC HI dia. 20 mm
10 Instalation Break Glass dengan kabel NYA 2 x 1.5 mm² point 2 - -
in conduit PVC HI dia. 20 mm
11 Instalationi jack telephone dengan kabel ITC 2 x dia. 0,6mm dalam point 2 - -
in conduit PVC HI dia. 20 mm

D.3. 2 2nd Floor


1 Terminal Box (TBFA-2) set 1 - -
2 Horn and Strobe pcs 2 - -
3 Manual Break Glass pcs 2 - -
4 Rate of Rise Heat Detector Addresible pcs 12 - -
5 Smoke Detector Addressable pcs 3 - -
6 Telephone Jack pcs 2 - -
7 Instalation Detector Addressable dengan kabel STP AWG #18 point 15 - -
in conduit PVC HI dia. 20 mm
8 Instalation Horn & Strobe dengan Kabel NYA 3 x 1,5 mm2 point 2 - -
in conduit PVC HI dia. 20 mm
9 Instalation Break Glass dengan kabel NYA 2 x 1.5 mm² point 2 - -
in conduit PVC HI dia. 20 mm
10 Instalationi jack telephone dengan kabel ITC 2 x dia. 0,6mm dalam point 2 - -
in conduit PVC HI dia. 20 mm

D.3. 3 3rd Floor


1 Terminal Box (TBFA-3) set 1 - -
2 Horn and Strobe pcs 2 - -
3 Manual Break Glass pcs 2 - -
4 Rate of Rise Heat Detector Addresible pcs 16 - -
5 Smoke Detector Addressable pcs 1 - -
6 Telephone Jack pcs 2 - -
7 Instalation Detector Addressable dengan kabel STP AWG #18 point 17 - -
in conduit PVC HI dia. 20 mm
8 Instalation Horn & Strobe dengan Kabel NYA 3 x 1,5 mm2 point 2 - -
in conduit PVC HI dia. 20 mm
9 Instalation Break Glass dengan kabel NYA 2 x 1.5 mm² point 2 - -
in conduit PVC HI dia. 20 mm
10 Instalationi jack telephone dengan kabel ITC 2 x dia. 0,6mm dalam point 2 - -
in conduit PVC HI dia. 20 mm

D.3. 4 4th Floor


1 Terminal Box (TBFA-4) set 1 - -
2 Horn and Strobe pcs 2 - -
3 Manual Break Glass pcs 2 - -
4 Rate of Rise Heat Detector Addresible pcs 8 - -
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 15 of 46
HARGA SAT. TOTAL HARGA
NO. URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )
5 Smoke Detector Addressable pcs 1 - -
6 Telephone Jack pcs 2 - -
7 Instalation Detector Addressable dengan kabel STP AWG #18 point 9 - -
in conduit PVC HI dia. 20 mm

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 16 of 46


HARGA SAT. TOTAL HARGA
NO. URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )
8 Instalation Horn & Strobe dengan Kabel NYA 3 x 1,5 mm2 point 2 - -
in conduit PVC HI dia. 20 mm
9 Instalation Break Glass dengan kabel NYA 2 x 1.5 mm² point 2 - -
in conduit PVC HI dia. 20 mm
10 Instalationi jack telephone dengan kabel ITC 2 x dia. 0,6mm dalam point 2 - -
in conduit PVC HI dia. 20 mm

D.3. 5 5th Floor


1 Terminal Box (TBFA-5) set 1 - -
2 Horn and Strobe pcs 2 - -
3 Manual Break Glass pcs 2 - -
4 Rate of Rise Heat Detector Addresible pcs 8 - -
5 Smoke Detector Addressable pcs 1 - -
6 Telephone Jack pcs 2 - -
7 Instalation Detector Addressable dengan kabel STP AWG #18 point 9 - -
in conduit PVC HI dia. 20 mm
8 Instalation Horn & Strobe dengan Kabel NYA 3 x 1,5 mm2 point 2 - -
in conduit PVC HI dia. 20 mm
9 Instalation Break Glass dengan kabel NYA 2 x 1.5 mm² point 2 - -
in conduit PVC HI dia. 20 mm
10 Instalationi jack telephone dengan kabel ITC 2 x dia. 0,6mm dalam point 2 - -
in conduit PVC HI dia. 20 mm

D.4 TESTING & COMMISIONING lot 1 - -

( 1.D ) = TOTAL INSTALATION FIRE ALARM -

E PUBLIC ADDRESS & GENERAL ANNOUNCEMENT


E.1 MAIN EQUIPMENT
1 Paging Microphone & Chime Tone + Key Pad unit 2 - -
2 Power Amplifier 240 W unit 3 - -
3 DVD / VCD, MP3 player , Radio Tuner unit 1 - -
4 Mixer Pre Amplifier / Sistem Controller unit 1 - -
dilengkapi dengan :
- Emergency Control Panel & Voice Manager
- Interface to Fire Alarm
- Pre-record Message
- Activated by Programmable
5 Speaker selector 20 Zona unit 1 - -
6 Evacuate Massege module unit 1 - -
7 Kabinet Rack lengkap blower junction dan aksesories + Rectifier, Battery charger unit 1 - -
8 Power Supply lengkap dengan surge arrester unit 1 - -
9 Main Distibution Frame (MDF) Sound System unit 1 - -
10 Instalasi pengkabelan peralatan utama (ruang kontrol) lot 1 - -

E.2 Cable feeder in conduit PVC HI dia 20 mm :


1 - NYMHY 2(3 x 2,5 mm²) MDF to TB-SS1 m 25 - -
2 - NYMHY 2(3 x 2,5 mm²) MDF to TB-SS2 m 29 - -
3 - NYMHY 2(3 x 2,5 mm²) MDF to TB-SS3 m 33 - -
4 - NYMHY 2(3 x 2,5 mm²) MDF to TB-SS4 m 37 - -
5 - NYMHY 2(3 x 2,5 mm²) MDF to TB-SS5 m 41 - -

E.3 FIXTURES & INSTALATION

E.3.1 1st FLOOR , Mezzanine & Power House


Fixtures & Armatures
1 Terminal Box Sound System (TB-SS1) unit 1 - -
2 Ceiling speaker 3 watt & matching transformer pcs 2 - -
3 Wall Speaker 6 Watt fire proof pcs 6 - -
4 Volume Control 6 Watt pcs 13 - -
Installation fixtures c/w conduit,cable & acc
1 Instalasi Speaker dengan kabel NYMHY 2 x 1.5 mm2 in conduit point 2 - -
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 17 of 46
HARGA SAT. TOTAL HARGA
NO. URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )
2 Instalasi untuk Speaker dengan kabel FRC 2 x 1.5 mm2 point 6 - -

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 18 of 46


HARGA SAT. TOTAL HARGA
NO. URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )
E.3.2 2nd FLOOR
Fixtures & Armatures
1 Terminal Box Sound System (TB-SS2) unit 1 - -
2 Ceiling speaker 3 watt & matching transformer pcs 18 - -
3 Wall Speaker 6 Watt fire proof pcs 2 - -
4 Volume Control 6 Watt pcs 8 - -
Installation fixtures c/w conduit,cable & acc
1 Instalasi Speaker dengan kabel NYMHY 2 x 1.5 mm2 in conduit point 18 - -
2 Instalasi untuk Speaker dengan kabel FRC 2 x 1.5 mm2 point 2 - -

E.3.3 3rd FLOOR


Fixtures & Armatures
1 Terminal Box Sound System (TB-SS3) unit 1 - -
2 Ceiling speaker 3 watt & matching transformer pcs 20 - -
3 Wall Speaker 6 Watt fire proof pcs 9 - -
4 Volume Control 6 Watt pcs 2 - -
Installation fixtures c/w conduit,cable & acc
1 Instalasi Speaker dengan kabel NYMHY 2 x 1.5 mm2 in conduit point 20 - -
2 Instalasi untuk Speaker dengan kabel FRC 2 x 1.5 mm2 point 9 - -

E.3.4 4th FLOOR


Fixtures & Armatures
1 Terminal Box Sound System (TB-SS4) unit 1 - -
2 Ceiling speaker 3 watt & matching transformer pcs 12 - -
3 Wall Speaker 6 Watt fire proof pcs 2 - -
4 Volume Control 6 Watt pcs 7 - -
Installation fixtures c/w conduit,cable & acc
1 Instalasi Speaker dengan kabel NYMHY 2 x 1.5 mm2 in conduit point 12 - -
2 Instalasi untuk Speaker dengan kabel FRC 2 x 1.5 mm2 point 2 - -

E.3.5 5th FLOOR


Fixtures & Armatures
1 Terminal Box Sound System (TB-SS5) unit 1 - -
2 Ceiling speaker 3 watt & matching transformer pcs 12 - -
3 Wall Speaker 6 Watt fire proof pcs 2 - -
4 Volume Control 6 Watt pcs 7 - -
Installation fixtures c/w conduit,cable & acc
1 Instalasi Speaker dengan kabel NYMHY 2 x 1.5 mm2 in conduit point 12 - -
2 Instalasi untuk Speaker dengan kabel FRC 2 x 1.5 mm2 point 2 - -

E.4 TESTING & COMMISIONING lot 1 - -

( 1.E ) = TOTAL INSTALATION PUBLIC ADDRES & GENERAL ANOUNCCEMENT -

F INSTALASI PROYEKTOR
F. 1 1st Floor
1 Socket outlet 200VA for proyektor pcs 2 - -
2 Installation Cable NYM 3 x 2.5 mm² for Socket Outlet 200 VA point 2 - -
3 VGA outlet, HDMI outlet pcs 2 - -
4 Instalasi dengan kabel VGA dan HDMI ke outlet/laptop dalam conduit PVC HI dia. 20 point 2 - -

F. 2 2nd Floor
1 Socket outlet 200VA for proyektor pcs 6 - -
2 Installation Cable NYM 3 x 2.5 mm² for Socket Outlet 200 VA point 6 - -
3 VGA outlet, HDMI outlet pcs 6 - -
4 Instalasi dengan kabel VGA dan HDMI ke outlet/laptop dalam conduit PVC HI dia. 20 point 6 - -

F. 3 4th Floor
1 Socket outlet 200VA for proyektor pcs 5 - -
2 Installation Cable NYM 3 x 2.5 mm² for Socket Outlet 200 VA point 5 - -
3 VGA outlet, HDMI outlet pcs 5 - -
4 Instalasi dengan kabel VGA dan HDMI ke outlet/laptop dalam conduit PVC HI dia. 20 point 5 - -

F. 5 5th Floor
1 Socket outlet 200VA for proyektor pcs 6 - -
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 19 of 46
HARGA SAT. TOTAL HARGA
NO. URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )
2 Installation Cable NYM 3 x 2.5 mm² for Socket Outlet 200 VA point 6 - -
3 VGA outlet, HDMI outlet pcs 6 - -
4 Instalasi dengan kabel VGA dan HDMI ke outlet/laptop dalam conduit PVC HI dia. 20 point 6 - -

F.13 TESTING & COMMISIONING lot 1 - -

( 1.F ) = TOTAL INSTALATION PROYEKTOR -

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 20 of 46


HARGA SAT. TOTAL HARGA
NO. URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )

H POWER HOUSE

H.1 DISTRIBUTION BOARD PANEL & POWER CABEL

H.1.1 MEDIUM VOLTAGE DISTRIBUTION PANEL


1 Pengadaan & Pemasangan Incoming PDTM (Panel Distribusi Tegangan unit 1 - -
Menengah) PDTM 20 KV / 3 phasa / 50 Hz, Incoming LBS Metal enclosed,
* Manual and fixed
* LBS 3P 630A 16 kA/1s
* 3 phase busbar 630 A
* Heater, Voltage Indicator, Earthing Switch
* Lightning Aresster 24 kV
* dan kelengkapan lainnya sesuai standard pabrikan

2 Pengadaan & Pemasangan Outgoing PDTM (Panel Distribusi Tegangan unit 1 - -


Menengah) PDTM 20 KV / 3 phasa / 50 Hz, Outgoing CB,
* Manual and fixed
* Disconnecting Switch 630A
* SF6 Circuit Breaker 630A
* 3 phase busbar 630 A
* 3 CT's class 0.5
* 3 VT's class 0.5
* Shun trip 220 VAC + auxillary contact
* Heater, Voltage Indicator, Earthing Switch
dan kelengkapan lainnya sesuai standard pabrikan

3 Transformator Distribusi unit 1 - -


* Type
* Bahan
* Capacity
* Voltage primer
* Voltage secunder
* Cos phi
* Trafo dilengkapi dengan Plug in bushing lengkap terpasang

4 N2XSY 3 x 1 x 95 mm2 From Cubicle TM to trafo m 14 - -


5 N2XSEBY 3 x 120 mm2 From Gardu PLN to Cubicle TM m 50 - -

H.1.2 DISTRIBUTION BOARD PANEL


1 PDTR unit 1 - -
2 KAPASITOR BANK 300 KVAR / 415V unit 1 - -

H.2 CABLE FEEDER


1 Cable feeder instalation from TRAFO to PDTR m 15 - -
2 Cable feeder instalation from PKG to PDTR m 8 - -
3 Cable feeder instalation from PDTR to Capasitor Bank m 8 - -
4 Cable feeder instalation from PDTR to PP. Power House m 14 - -

H.3 GROUNDING
1 BCC 4x120 mm² m 15 - -
2 BCC 4 mm2 m 10 - -
3 Grounding Installation Panel TR (Resistansi Max 5 Ohm) Lot 6 - -

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 21 of 46


HARGA SAT. TOTAL HARGA
NO. URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )
- Copper Rod dia 5/8 "
- Excavation & Backfilling
- Box Control 400 X 400 X 400 mm3
- Terminal Busbar 150x100x15 mm3

H.4 LIGHTING, EXHAUST FAN & RECEPTACKLE


1 GMS TG LED 1 X 19 W pcs 14 - -
2 Double switch pcs 4 - -
3 Socket Outlet 200 VA pcs 6 - -
4 Exhaust fan Industrial type unit 3 - -
5 Installation Cable NYM 3 x 2.5 mm² for Lamp point 27 - -

H.5 GENERATOR SET INSTALATION

Pengadaan dan pemasangan sistim sesuai dengan gambar & Spesifikasi Teknis

1 Diesel Generator Set 1 - -


- Type : Open Type
- Kapasitas : minimal 800 KVA , 220/380 V / 1500 rpm Prime Power
- Cos phi : 0,80 / 50 Hz
- Lengkap dengan : Cooling Radiator, muffler, Engine pad, Battery, Battery
Charger dan accessoriesnya termasuk setting Genset diatas pondasi

2 Pengadaan dan pemasangan pipa solar jenis black steel sch 40 lengkap dengan 1 - -
valve-valve, fuel oil meter, water sparator, termasuk dengan material sambungan,
penggantung, klem, bracket dan semua aksesoris pemasangan seperti diuraikan
pada spesifikasi teknis dan gambar

3 Pompa solar listrik 1 - -


4 Pompa solar tangan 1 - -
5 Tangki solar harian 500 liter, plat t = 3 mm 1 - -
6 Tangki solar mingguan 8000 liter, plat t = 3 mm 1 - -
7 Pemipaan exhaust dia. 4", lengkap dengan gantungan jenis spring mounting 2 - -
8 Isolasi rock wool seluruh pipa exhaust lengkap Jacketing 1 - -
9 Wall lining sound Proof dengan Rockwool density 80 kg/cm3 tebal 50 mm lengkap 122 - -
dengan spindle pin, glass Cloth dan aksesories lainnya
10 Sound Attenuator Inlet 1 - -
11 Sound Attenuator Outlet 1 - -
12 Exhaust Silincer type Resedential 2 - -
13 Exhaust Air Grille By Sipil
14 Pengkabelan Genset ke PKG:
15 NYY 2(4 x 1c x 300) mm2 = (8 row) 14 - -
16 NYM 4 (3 x 2,5 mm2) 14 - -
17 STP AWG 18 3 pair 14 - -

18 Grounding Body Genset, BCC 70 mm², termasuk rod + bak kontrol 1 - -


19 Testing & Commissioning Genset termasuk pengadaan solar selama testing 1 - -
(pengetesan dengan menggunakan load bank)
20 Perijinan Depnaker 1 - -

(H) = TOTAL INSTALATION POWER HOUSE -

I PENYAMBUNGAN DAYA 725 kVA


Biaya Penyambungan VA 725000 - -
Jaminan Langganan VA 725000 - -
Biaya Pemeriksaan & SLO Ls 1 - -

(I) = TOTAL BIAYA PENYAMBUNGAN DAYA BARU -

(1.A~1.F ) = TOTAL ELECTRICAL -

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 22 of 46


BILL OF QUANTITY (BOQ)
ANGGARAN BIAYA PEMBANGUNAN GEDUNG JURUSAN PETERNAKAN
POLITEKNIK NEGERI JEMBER
TAHUN ANGGARAN 2020-2021

VB. PEKERJAAN MEKANIKAL


HARGA SAT. TOTAL HARGA
NO. URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )

A BUILDING CLEAN WATER SUPPLY INSTALATION SYSTEM


A.1 MAIN EQUIPMENT

1 Packaged Booster Pump include : set 1 - -


- Capacity 12 m3/h Head 15 m, 1 set = 2 pump
- Control Panel booster Multi-R With VSD / Pump
- Pressure tank ; suction manifold ; pressure gauge
- Include base frame

2 Roof Tank cap. 16 m³ type panel, include Accessories set 1 - -


- Pipe instalation
- level control
- Isolation Valve (inlet, Outlet, Drain, Bypass)
- Tank Base

A.2 SANITARY, PIPE & SUPPORTING MATERIAL

A.2.1 Taman
PPR-PN10
1 PPR dia. 25 mm m 67 - -
2 PPR dia. 20 mm m 81 - -
3 PPR dia. 15 mm2 m 54 - -
4 Gate Valve dia.25 mm2 pcs 1 - -
5 Excavation & Back Filling m 202 - -
Supporting Material
1 Fitting for Pipe - CW lot 1 - -
2 Hanger Support - CW lot 1 - -

A.2.2 1st FLOOR


PPR-PN10
1 PPR dia. 50 mm2 from Pump to Roof tank m 135 - -
2 PPR dia. 25 mm2 m 60 - -
3 PPR dia. 20 mm2 m 27 - -
4 PPR dia. 15 mm2 m 26 - -
5 Gate Valve dia.25 mm2 pcs 2 - -
Supporting Material
1 Fitting for Pipe - CW lot 1 - -
2 Hanger Support - CW lot 1 - -

A.2.3 2nd FLOOR


PPR-PN10
1 PPR dia. 25 mm2 m 110 - -
2 PPR dia. 20 mm2 m 84 - -
3 PPR dia. 15 mm2 m 60 - -
4 Gate Valve dia.25 mm2 pcs 2 - -
Supporting Material
1 Fitting for Pipe - CW lot 1 - -
2 Hanger Support - CW lot 1 - -

A.2.4 3rd FLOOR


PPR-PN10
1 PPR dia. 25 mm2 m 110 - -
2 PPR dia. 20 mm2 m 96 - -
3 PPR dia. 15 mm2 m 48 - -
4 Gate Valve dia.25 mm2 pcs 2 - -
Supporting Material
1 Fitting for Pipe - CW lot 1 - -
2 Hanger Support - CW lot 1 - -

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 23 of 46


HARGA SAT. TOTAL HARGA
NO. URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 24 of 46


HARGA SAT. TOTAL HARGA
NO. URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )
A.2.5 4th FLOOR
PPR-PN10
1 PPR dia. 25 mm2 m 14 - -
2 PPR dia. 20 mm2 m 56 - -
3 PPR dia. 15 mm2 m 40 - -
4 Gate Valve dia.25 mm2 pcs 1 - -
Supporting Material
1 Fitting for Pipe - CW lot 1 - -
2 Hanger Support - CW lot 1 - -

A.2.6 5th FLOOR


PPR-PN10
1 PPR dia. 25 mm2 m 14 - -
2 PPR dia. 20 mm2 m 60 - -
3 PPR dia. 15 mm2 m 36 - -
4 Gate Valve dia.25 mm2 pcs 2 - -
Supporting Material
1 Fitting for Pipe - CW lot 1 - -
2 Hanger Support - CW lot 1 - -

A.2.7 On Shaft & top Floor


1 PPR dia.50 mm2 riser transfer pump m 30 - -
2 PPR dia.40 mm2 riser Booster pump m 22 - -
Supporting Material
1 Fitting for Pipe - CW lot 1 - -
2 Hanger Support - CW lot 1 - -

A.2.15 Valve & Accessories


Class 10K
1 Dia. 50 mm2 inlet Roof Tank pcs 2 - -
2 Dia. 65 mm2 outlet Roof Tank pcs 4 - -
Dia. 25 mm2 pcs 4 - -
3 Water Hammer Eliminator dia 40 mm2 pcs 1 - -
4 Pressure Reducing Valve (PRV) dia 40 mm2: pcs 1 - -
5 Pressure Gauge + Valve pcs 4 - -
6 Check Valve dia 50 mm outlet roof tank pcs 1 - -
7 Faucet pcs 1 - -

A.3 TESTING & COMMISSIONING BUILDING CLEAN WATER INSTALLATION


Pressure Test & Function Test - CW Lot 1 - -

( 2.A ) = TOTAL CLEAN WATER SUPPLY INSTALLATION -

B SANITARY, PIPE & SUPPORTING MATERIAL

B.1 RISER SEWAGE WATER - PVC Pipe, AW Class


1 Riser Sewage dia. 150 mm m 40 - -

B.2 SEWAGE WATER INSTALATION SYSTEM

.B.2 SEWAGE TREATMENT PLANT (STP)


1 Sewage Treatment Plant (STP) cap : 20 Meter cubic per day include Accessories unit 1 - -
- Inlet/outlet BOD = 300/20 ppm
- Tank, media cell
- Blower
- Submersible pump
- Clorination
- Pipe & Instalation
- Control Panel
- base
- Box Control Submersible Pump @ 2 unit
2 Sewage Treatment Plant (STP) cap : 2 Meter cubic per day include Accessories unit 2 - -
- Inlet/outlet BOD = 300/20 ppm
- Tank, media cell
- Blower
- Submersible pump
- Clorination

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 25 of 46


HARGA SAT. TOTAL HARGA
NO. URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )
- Pipe & Instalation
- Control Panel
- base

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 26 of 46


HARGA SAT. TOTAL HARGA
NO. URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )

B.3 SANITARY, PIPE & SUPPORTING MATERIAL

B.3.1 1st FLOOR


SANITARY
1 Clean Out type Floor dia.4 inch - c/w Avur pcs 3 - -
PVC Pipe - AW Class
1 PVC Pipe dia. 150 mm m 76 - -
2 PVC Pipe dia. 100 mm m 14 - -
Supporting Material
1 Fitting for Pipe - SW lot 1 - -
2 Hanger Support - SW lot 1 - -

B.3.2 2nd FLOOR


SANITARY
1 Clean Out type Floor dia.4 inch - c/w Avur pcs 2 - -
PVC Pipe - AW Class
1 PVC Pipe dia. 100 mm m 30 - -
Supporting Material
1 Fitting for Pipe - SW lot 1 - -
2 Hanger Support - SW lot 1 - -

B.3.3 3rd FLOOR


SANITARY
1 Clean Out type Floor dia.4 inch - c/w Avur pcs 2 - -
PVC Pipe - AW Class
1 PVC Pipe dia. 100 mm m 85 - -
Supporting Material
1 Fitting for Pipe - SW lot 1 - -
2 Hanger Support - SW lot 1 - -

B.3.4 4th FLOOR


SANITARY
1 Clean Out type Floor dia.4 inch - c/w Avur pcs 3 - -
PVC Pipe - AW Class
1 PVC Pipe dia. 100 mm m 30 - -
Supporting Material
1 Fitting for Pipe - SW lot 1 - -
2 Hanger Support - SW lot 1 - -

B.3.5 5th FLOOR


SANITARY
1 Clean Out type Floor dia.4 inch - c/w Avur pcs 2 - -
PVC Pipe - AW Class
1 PVC Pipe dia. 100 mm m 30 - -
Supporting Material
1 Fitting for Pipe - SW lot 1 - -
2 Hanger Support - SW lot 1 - -

B.4 TESTING & COMMISSIONING SEWAGE WATER INSTALLATION


StagnantTest & Function Test - SW Lot 1 - -

( 2.B ) = TOTAL SEWAGE WATER INSTALLATION -

C WASTE WATER & VENT INSTALLATION SYSTEM

C.1 RISER WASTE WATER - PVC Pipe, AW Class


1 PVC Pipe dia. 100mm m 22 - -
2 Riser Vent on shaft dia. 80mm m 22 - -
Supporting Material
1 Fitting for Pipe - WW lot 1 - -
2 Hanger Support - WW lot 1 - -

C.2 SANITARY, PIPE & SUPPORTING MATERIAL


C.2.1 1st Floor
1 Grease Trap Capacity 30 liter unit 3 - -
PVC Pipe - AW Class

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 27 of 46


HARGA SAT. TOTAL HARGA
NO. URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )
1 PVC Pipe dia. 50mm m 8 - -
2 PVC Pipe dia. 100mm m 84 - -

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 28 of 46


HARGA SAT. TOTAL HARGA
NO. URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )
Vent
1 PVC Pipe dia. 32mm m 89 - -
Supporting Material
1 Fitting for Pipe - WW lot 1 - -
2 Hanger Support - WW lot 1 - -
C.2.2 2nd Floor
PVC Pipe - AW Class
1 PVC Pipe dia. 40mm m 17 - -
2 PVC Pipe dia. 50mm m 84 - -
3 PVC Pipe dia. 100mm m 48 - -
Vent
1 PVC Pipe dia. 32mm m 128 - -
Supporting Material
1 Fitting for Pipe - WW lot 1 - -
2 Hanger Support - WW lot 1 - -
C.2.3 3rd Floor
PVC Pipe - AW Class
1 PVC Pipe dia. 40mm m 11 - -
2 PVC Pipe dia. 50mm m 68 - -
3 PVC Pipe dia. 100mm m 40 - -
Vent
1 PVC Pipe dia. 32mm m 78 - -
Supporting Material
1 Fitting for Pipe - WW lot 1 - -
2 Hanger Support - WW lot 1 - -
C.2.4 4th Floor
PVC Pipe - AW Class
1 PVC Pipe dia. 40mm m 10 - -
2 PVC Pipe dia. 50mm m 34 - -
3 PVC Pipe dia. 100mm m 26 - -
Vent
1 PVC Pipe dia. 32mm m 43 - -
Supporting Material
1 Fitting for Pipe - WW lot 1 - -
2 Hanger Support - WW lot 1 - -
C.2.5 5th Floor
PVC Pipe - AW Class
1 PVC Pipe dia. 40mm m 10 - -
2 PVC Pipe dia. 50mm m 28 - -
3 PVC Pipe dia. 100mm m 26 - -
Vent
1 PVC Pipe dia. 32mm m 43 - -
Supporting Material
1 Fitting for Pipe - WW lot 1 - -
2 Hanger Support - WW lot 1 - -

C.3 TESTING & COMMISSIONING SEWAGE WATER INSTALLATION


StagnantTest & Function Test - SW Lot 1 - -

( 2.C ) = TOTAL WASTE WATER INSTALLATION -

D RAIN WATER INSTALLATION SYSTEM

D.1 On site PVC Pipe - AW Class


1 PVC pipe dia. 150mm m 92 - -
2 PVC pipe dia. 100mm m 512 - -

D.2 FIXTURES
1 Roof Drain dia.4 inch pcs 27 - -
Supporting Material
1 Fitting for Pipe - RW lot 1 - -
2 Hanger Support - RW lot 1 - -
D.3 Gutter include cover or grille m Civil Scoope
D.4 Box Control unit 27 Civil Scoope

D.5 TESTING & COMMISSIONING RAIN WATER INSTALLATION

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 29 of 46


HARGA SAT. TOTAL HARGA
NO. URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )
1 Stagnant Test & Function Test - RW Lot 1 - -

( D ) TOTAL INSTALLATION RAIN WATER -

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 30 of 46


HARGA SAT. TOTAL HARGA
NO. URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )

E FIRE FIGHTING INSTALATION SYSTEM


E.1 HYDRANT SITE

1 Outdoor Hydrant Box


Box Hydrant Type. C unit 4 - -
a. Material utama
- Box Hydrant type. C
- Selang dia. 2.1/2" x 30 mtr
- Nozle dia. 2.1/2"
- Hose Rack dia. 2.1/2"
b. Material bantu
- Moor + Baut + Packing + Seal tape dll
- Include box support
2 Pillar Hydrant unit 4 - -
3 Siamese Connection unit 1 - -
4 Check Valve unit 1 - -
5 Gate Valve dia. 100 mm unit 4 - -
6 Catodic protection Lot 1 - -
7 Pipe Wrapping Lot 1 - -

E.2 PEMIPAAN SITE (OUT DOOR HYDRANT) & RISER FROM PUMP ROOM
Black Steel Pipe Sch 40
1 Black steel pipe sch 40 dia. 150mm m 153 - -
2 Black steel pipe sch 40 dia. 100mm m 180 - -
3 Excavation & Back Filling m 333 - -
Supporting Material
1 Fitting for Pipe - CW lot 1 - -
2 Hanger Support - CW lot 1 - -

E.3 1st FLOOR


EQUIPMENT
1 Indoor Hydrant Box 1200x800x200mm c/w: unit 2 - -
Box Hydrant Type. B
a. Material utama
- Box Hydrant type. B
- Selang dia. 1.1/2" x 30 mtr
- Nozle dia. 1.1/2"
- Hose Rack dia. 1.1/2"
- Hydrant Valve dia. 1.1/2"
- Hydrant Valve dia. 2.1/2"
b. Material bantu
- Include box support
- Moor + Baut + Packing + Seal tape dll
2 Fire Extinguisher Dry chemical type ABC unit 3 - -
Class ABC 6 Kg c/w include Bracket
3 Head Sprinkler unit 64 - -

HYDRANT PIPE - Black Steel Pipe Sch 40


1 Black steel pipe sch 40 dia. 75mm m 20.00 - -
2 Black steel pipe sch 40 dia. 65mm m 39.00 - -
3 Black steel pipe sch 40 dia. 40mm m 5.00 - -

SPRINKLER PIPE - Black Steel Pipe Sch 40


1 Black steel pipe sch 40 dia. 100mm m 18.00 - -
2 Black steel pipe sch 40 dia. 80 mm m 16.00 - -
3 Black steel pipe sch 40 dia. 65mm m 24.00 - -
4 Black steel pipe sch 40 dia. 50 mm m 28.00 - -
5 Black steel pipe sch 40 dia. 40mm m 28.00 - -
6 Black steel pipe sch 40 dia. 32 mm m 32.00 - -
7 Black steel pipe sch 40 dia. 25mm m 128.00 - -
8 Black steel pipe sch 40 dia. 25 mm (for drain) m 65.00 - -

VALVE
1 BCV 4" unit 1 - -
2 Gate Valve diameter 3" 16k unit 1 - -
3 Landing Valve diameter 2 1/2" 16k unit 1 - -

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 31 of 46


HARGA SAT. TOTAL HARGA
NO. URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )
4 Gate Valve diameter 1" 16k unit 4 - -
5 Sight Glass unit 2 - -
6 Flow switch Dia. 4" unit 1 - -
7 Pressure Gauge + Valve unit 2 - -
Supporting Material
1 Fitting for Pipe - FF lot 1 - -
2 Hanger Support - FF lot 1 - -

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 32 of 46


HARGA SAT. TOTAL HARGA
NO. URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )

E.4 2nd FLOOR


EQUIPMENT
1 Indoor Hydrant Box 1200x800x200mm c/w: unit 2 - -
Box Hydrant Type. B
a. Material utama
- Box Hydrant type. B
- Selang dia. 1.1/2" x 30 mtr
- Nozle dia. 1.1/2"
- Hose Rack dia. 1.1/2"
- Hydrant Valve dia. 1.1/2"
- Hydrant Valve dia. 2.1/2"
b. Material bantu
- Include box support
- Moor + Baut + Packing + Seal tape dll
2 Fire Extinguisher Dry chemical type ABC unit 3 - -
Class ABC 6 Kg c/w include Bracket
3 Head Sprinkler unit 60 - -

HYDRANT PIPE - Black Steel Pipe Sch 40


1 Black steel pipe sch 40 dia. 75mm m 20.00 - -
2 Black steel pipe sch 40 dia. 65mm m 24.00 - -
3 Black steel pipe sch 40 dia. 40mm m 6.00 - -

SPRINKLER PIPE - Black Steel Pipe Sch 40


1 Black steel pipe sch 40 dia. 100mm m 18.00 - -
2 Black steel pipe sch 40 dia. 80 mm m 16.00 - -
3 Black steel pipe sch 40 dia. 65mm m 24.00 - -
4 Black steel pipe sch 40 dia. 50 mm m 28.00 - -
5 Black steel pipe sch 40 dia. 40mm m 28.00 - -
6 Black steel pipe sch 40 dia. 32 mm m 32.00 - -
7 Black steel pipe sch 40 dia. 25mm m 120.00 - -
8 Black steel pipe sch 40 dia. 25 mm (for drain) m 65.00 - -

VALVE
1 BCV 4" unit 1 - -
2 Gate Valve diameter 3" 16k unit 1 - -
3 Landing Valve diameter 2 1/2" 16k unit 4 - -
4 Gate Valve diameter 1" 16k unit 2 - -
5 Sight Glass unit 1 - -
6 Flow switch Dia. 3" unit 1 - -
7 Pressure Gauge + Valve unit 2 - -
Supporting Material
1 Fitting for Pipe - FF lot 1 - -
2 Hanger Support - FF lot 1 - -

E.5 3rd FLOOR


EQUIPMENT
1 Indoor Hydrant Box 1200x800x200mm c/w: unit 2 - -
Box Hydrant Type. B
a. Material utama
- Box Hydrant type. B
- Selang dia. 1.1/2" x 30 mtr
- Nozle dia. 1.1/2"
- Hose Rack dia. 1.1/2"
- Hydrant Valve dia. 1.1/2"
- Hydrant Valve dia. 2.1/2"
b. Material bantu
- Include box support
- Moor + Baut + Packing + Seal tape dll
2 Fire Extinguisher Dry chemical type ABC unit 3 - -
Class ABC 6 Kg c/w include Bracket
3 Head Sprinkler unit 72 - -
HYDRANT PIPE - Black Steel Pipe Sch 40
1 Black steel pipe sch 40 dia. 75mm m 20.00 - -
2 Black steel pipe sch 40 dia. 65mm m 24.00 - -
3 Black steel pipe sch 40 dia. 40mm m 6.00 - -

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 33 of 46


HARGA SAT. TOTAL HARGA
NO. URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )
SPRINKLER PIPE - Black Steel Pipe Sch 40
1 Black steel pipe sch 40 dia. 100mm m 18.00 - -
2 Black steel pipe sch 40 dia. 80 mm m 16.00 - -
3 Black steel pipe sch 40 dia. 65mm m 24.00 - -
4 Black steel pipe sch 40 dia. 50 mm m 28.00 - -
5 Black steel pipe sch 40 dia. 40mm m 28.00 - -
6 Black steel pipe sch 40 dia. 32 mm m 32.00 - -

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 34 of 46


HARGA SAT. TOTAL HARGA
NO. URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )
7 Black steel pipe sch 40 dia. 25mm m 6.00 - -
8 Black steel pipe sch 40 dia. 25 mm (for drain) m 65.00 - -

VALVE
1 BCV 4" unit 1 - -
2 Gate Valve diameter 3" 16k unit 1 - -
3 Landing Valve diameter 2 1/2" 16k unit 1 - -
4 Gate Valve diameter 1" 16k unit 4 - -
5 Sight Glass unit 1 - -
6 Flow switch Dia. 4" unit 1 - -
7 Pressure Gauge + Valve unit 2 - -
Supporting Material
1 Fitting for Pipe - FF lot 1 - -
2 Hanger Support - FF lot 1 - -

E.6 4th FLOOR


EQUIPMENT
1 Indoor Hydrant Box 1200x800x200mm c/w: unit 2 - -
Box Hydrant Type. B
a. Material utama
- Box Hydrant type. B
- Selang dia. 1.1/2" x 30 mtr
- Nozle dia. 1.1/2"
- Hose Rack dia. 1.1/2"
- Hydrant Valve dia. 1.1/2"
- Hydrant Valve dia. 2.1/2"
b. Material bantu
- Include box support
- Moor + Baut + Packing + Seal tape dll
2 Fire Extinguisher Dry chemical type ABC unit 3 - -
Class ABC 6 Kg c/w include Bracket
3 Head Sprinkler unit 63 - -

HYDRANT PIPE - Black Steel Pipe Sch 40


1 Black steel pipe sch 40 dia. 75mm m 20.00 - -
2 Black steel pipe sch 40 dia. 65mm m 24.00 - -
3 Black steel pipe sch 40 dia. 40mm m 6.00 - -

SPRINKLER PIPE - Black Steel Pipe Sch 40


1 Black steel pipe sch 40 dia. 100mm m 18.00 - -
2 Black steel pipe sch 40 dia. 80 mm m 16.00 - -
3 Black steel pipe sch 40 dia. 65mm m 24.00 - -
4 Black steel pipe sch 40 dia. 50 mm m 28.00 - -
5 Black steel pipe sch 40 dia. 40mm m 28.00 - -
6 Black steel pipe sch 40 dia. 32 mm m 32.00 - -
7 Black steel pipe sch 40 dia. 25mm m 126.00 - -
8 Black steel pipe sch 40 dia. 25 mm (for drain) m 65.00 - -

VALVE
1 BCV 4" unit 1 - -
2 Gate Valve diameter 3" 16k unit 1 - -
3 Landing Valve diameter 2 1/2" 16k unit 1 - -
4 Gate Valve diameter 1" 16k unit 4 - -
5 Sight Glass unit 1 - -
6 Flow switch Dia. 4" unit 1 - -
7 Pressure Gauge + Valve unit 2 - -
Supporting Material
1 Fitting for Pipe - FF lot 1 - -
2 Hanger Support - FF lot 1 - -

E.7 5th Floor


EQUIPMENT
1 Indoor Hydrant Box 1200x800x200mm c/w: unit 2 - -
Box Hydrant Type. B
a. Material utama
- Box Hydrant type. B
- Selang dia. 1.1/2" x 30 mtr

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 35 of 46


HARGA SAT. TOTAL HARGA
NO. URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )
- Nozle dia. 1.1/2"
- Hose Rack dia. 1.1/2"
- Hydrant Valve dia. 1.1/2"
- Hydrant Valve dia. 2.1/2"
b. Material bantu
- Include box support
- Moor + Baut + Packing + Seal tape dll

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 36 of 46


HARGA SAT. TOTAL HARGA
NO. URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )
2 Fire Extinguisher Dry chemical type ABC unit 3 - -
Class ABC 6 Kg c/w include Bracket
3 Head Sprinkler unit 60 - -

HYDRANT PIPE - Black Steel Pipe Sch 40


1 Black steel pipe sch 40 dia. 75mm m 20.00 - -
2 Black steel pipe sch 40 dia. 65mm m 24.00 - -
3 Black steel pipe sch 40 dia. 40mm m 6.00 - -

SPRINKLER PIPE - Black Steel Pipe Sch 40


1 Black steel pipe sch 40 dia. 100mm m 18.00 - -
2 Black steel pipe sch 40 dia. 80 mm m 16.00 - -
3 Black steel pipe sch 40 dia. 65mm m 24.00 - -
4 Black steel pipe sch 40 dia. 50 mm m 28.00 - -
5 Black steel pipe sch 40 dia. 40mm m 28.00 - -
6 Black steel pipe sch 40 dia. 32 mm m 32.00 - -
7 Black steel pipe sch 40 dia. 25mm m 120.00 - -
8 Black steel pipe sch 40 dia. 25 mm (for drain) m 65.00 - -

VALVE
1 BCV 4" unit 1 - -
2 Gate Valve diameter 3" 16k unit 1 - -
3 Landing Valve diameter 2 1/2" 16k unit 1 - -
4 Gate Valve diameter 1" 16k unit 2 - -
5 Sight Glass unit 1 - -
6 Flow switch Dia. 3" unit 1 - -
7 Pressure Gauge + Valve unit 2 - -
Supporting Material
1 Fitting for Pipe - FF lot 1 - -
2 Hanger Support - FF lot 1 - -

E.8 ON SHAFT
1 Black steel pipe sch 40 dia. 150mm for Hydrant & Sprinkler m 45 - -
2 Black steel pipe sch 40 dia. 50mm for Drain m 26 - -
Supporting Material
1 Fitting for Pipe - FF lot 1 - -
2 Hanger Support - FF lot 1 - -

E.8 TESTING & COMMISSIONING FIRE FIGHTING INSTALATION


1 Pressure Test & Function Test - FF Lot 1 - -

( E ) = TOTAL FIRE FIGHTING INSTALATION -

F AIR CONDITIONING & FAN

F.1 SINGLE SYSTEM (Inverter R410) DAIKIN

F.1.1 1st FLOOR


F.1.1.1 Single Split Wall Mounted R410
R. ME , Laboratorium 1 & 2 unit 10 - -
Capacity 24200 BTU/H

F.1.1.2 Instalation
1 Refrigrant Pipe include isolation 1" m 150 - -
2 Drain Pipe Dia. 25 mm include isolation unit 150 - -
3 Wired remote control unit 10 - -
4 Installation Cable (Indoor & Outdoor) in conduit pipe Point 10 - -
5 Refrigrant Gas lot 1 - -
6 Support material Indoor, Outdoor & Testing Commisioning unit 10 - -

F.1.2 MEZZANINE
F.1.2.1 Single Split Wall Mounted R410
1 Mezzanine 1 & 2 unit 4 - -
Capacity 14300 BTU/H

F.1.2.2 Instalation
1 Refrigrant Pipe include isolation 1" m 4 - -

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 37 of 46


HARGA SAT. TOTAL HARGA
NO. URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )
2 Drain Pipe Dia. 25 mm include isolation unit 4 - -
3 Wired remote control unit 4 - -
4 Installation Cable (Indoor & Outdoor) in conduit pipe Point 4 - -
5 Refrigrant Gas lot 1 - -
6 Support material Indoor, Outdoor & Testing Commisioning unit 4 - -

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 38 of 46


HARGA SAT. TOTAL HARGA
NO. URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )
F.1.3 2ND FLOOR
F.1.3.1 Single Split Wall Mounted R410
1 Lab 1, Lab 2, Lab 3, Lab 4, unit 16 - -
Capacity 24200 BTU/H
2 Gudang Alat & R. Rapat unit 6 - -
Capacity 20500 BTU/H
3 R. Teknisi 1, R. Teknisi 2, Ka Lab 1, Ka Lab 2 unit 4 - -
Capacity 8500 BTU/H

F.1.3.2 Instalation
1 Refrigrant Pipe include isolation 1" m 26 - -
2 Drain Pipe Dia. 25 mm include isolation unit 26 - -
3 Wired remote control unit 26 - -
4 Installation Cable (Indoor & Outdoor) in conduit pipe Point 26 - -
5 Refrigrant Gas lot 1 - -
6 Support material Indoor, Outdoor & Testing Commisioning unit 26 - -

F.1.4 3RD FLOOR


F.1.4.1 Single Split Wall Mounted R410
1 R. Administrasi Program study 1 & 2, Ka Prog study 1 & 2 unit 18 - -
Capacity 24200 BTU/H
2 Ka. Jur unit 1 - -
Capacity 20500 BTU/H
3 R. Admin Jurusan unit 4 - -
Capacity 17100 BTU/H
4 R. Sekertaris, Sek Juru, sek Prog 1 & 2 unit 4 - -
Capacity 11900 BTU/H

F.1.4.2 Instalation
1 Refrigrant Pipe include isolation 1" m 27 - -
2 Drain Pipe Dia. 25 mm include isolation unit 27 - -
3 Wired remote control unit 27 - -
4 Installation Cable (Indoor & Outdoor) in conduit pipe Point 27 - -
5 Refrigrant Gas lot 1 - -
6 Support material Indoor, Outdoor & Testing Commisioning unit 27 - -

F.1.5 4TH FLOOR


F.1.5.1 Single Split Wall Mounted R410
1 R. Tugas akhir 1, 2, 3. Perpustakaan, R.Rapat Besar 1,2 unit 24 - -
Capacity 24200 BTU/H

F.1.5.2 Instalation
1 Refrigrant Pipe include isolation 1" m 24 - -
2 Drain Pipe Dia. 25 mm include isolation unit 24 - -
3 Wired remote control unit 24 - -
4 Installation Cable (Indoor & Outdoor) in conduit pipe Point 24 - -
5 Refrigrant Gas lot 1 - -
6 Support material Indoor, Outdoor & Testing Commisioning unit 24 - -

F.1.6 4TH FLOOR


F.1.6.1 Single Split Wall Mounted R410
1 R. Kelas 1,2,3,4,5,6 unit 24 - -
Capacity 24200 BTU/H

F.1.6.2 Instalation
1 Refrigrant Pipe include isolation 1" m 24 - -
2 Drain Pipe Dia. 25 mm include isolation unit 24 - -
3 Wired remote control unit 24 - -
4 Installation Cable (Indoor & Outdoor) in conduit pipe Point 24 - -
5 Refrigrant Gas lot 1 - -
6 Support material Indoor, Outdoor & Testing Commisioning unit 24 - -

F.2 FAN & DUCTING


F.2.1 1st Floor
FAN
1 Duct in line fan 600 CMH unit 1 - -
2 Duct in line fan 1280 CMH unit 2 - -

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 39 of 46


HARGA SAT. TOTAL HARGA
NO. URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )
3 Ducting BJLS m 4 - -
4 Grille unit 6 - -
5 Instalation Cable point 3 - -

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 40 of 46


HARGA SAT. TOTAL HARGA
NO. URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )
F.2.2 2nd Floor
FAN
1 Duct in line fan 600 CMH unit 1 - -
2 Duct in line fan 1280 CMH unit 8 - -
3 Exhaust Fan 423 CFM unit 1 - -
4 Ducting BJLS m 36 - -
5 PVC Duct dia 100 m 8 - -
6 PVC Duct dia 150 m 8 - -
7 PVC Duct dia 200 m 4 - -
8 Grille unit 24 - -
9 Instalation Cable point 10 - -

F.2.3 3rd Floor


FAN
1 Duct in line fan 600 CMH unit 1 - -
2 Exhaust Fan 423 CFM unit 1 - -
3 PVC Duct dia 100 m 8 - -
4 PVC Duct dia 150 m 8 - -
5 PVC Duct dia 200 m 4 - -
6 Grille unit 4 - -
7 Instalation Cable point 2 - -

F.2.4 4th Floor


FAN
1 Duct in line fan 600 CMH unit 1 - -
2 Exhaust Fan 423 CFM unit 1 - -
3 PVC Duct dia 100 m 8 - -
4 PVC Duct dia 150 m 8 - -
5 PVC Duct dia 200 m 4 - -
6 Grille unit 4 - -
7 Instalation Cable point 1 - -

F.2.5 5th Floor


FAN
1 Duct in line fan 600 CMH unit 1 - -
2 Exhaust Fan 423 CFM unit 1 - -
3 PVC Duct dia 100 m 8 - -
4 PVC Duct dia 150 m 8 - -
5 PVC Duct dia 200 m 4 - -
6 Grille unit 4 - -
7 Instalation Cable point 1 - -

(F ) = TOTAL AIR CONDITIONING & EXHAUST FAN -

G ELEVATOR (LIFT)
G.1 Passenger Lift Unit (Merk Hermes)
- P (1000kg) 15 person unit 2 - -
- Speed : 1,6 m/s
- Drive system : ACVF Gearless
- Non Machine room
- Control : Touch sensitive Buttons
- Operation control : Simplex
- Door Type : 2 Panel center opening
- Door Quantity :5
- Car Floor : Artificial Granite Tile
- Floor served : 1~4
- Automatic Rescue Device
- Pit lift :2m
- Include Interfacing fire alarm

G.2 Installation & Accessories unit 2 - -


- ARD berikut Kelengkapannya
- Cabeling from Panel Lift to machine & control Panel
- Supervisory panel in R. Kontrol
- Biaya pemasangan Lift
- Biaya Perijinan Depnaker
- Testing dan Comissioning

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 41 of 46


HARGA SAT. TOTAL HARGA
NO. URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )
- Biaya scapolding / perancah

(G ) = TOTAL ELEVATOR INSTALATION -

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 42 of 46


HARGA SAT. TOTAL HARGA
NO. URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )

H PUMP ROOM INSTALLATION

H.1. MAIN EQUIPMENT


Transfer Pump Centrifugal Type Unit 1 - -
- Capacity 12 m3/jam,
- Head 40 m
- Control Panel & cable (Auto-Manual)
- Parallel Alternate
- Include base frame

H.2. Accessories Transfer Pump


Gate Valve dia.40 mm pcs 6 - -
Check Valve dia.40mm pcs 3 - -
Strainer dia.50mm pcs 3 - -
Flexible Joint dia.40mm pcs 6 - -
Pressure gauge unit 3 - -
Pressure switch unit 3 - -
Level Switch unit 2 - -
Float-valve dia.50mm pcs 2 - -
Header discharge dia.80mm @ 2meter unit 1 - -
Blind Flange dia. 80 mm pcs 2 - -
Suction pipe GIP dia. 50mm m 15 - -
WLC include cabeling lot 1 - -

H.3 Valve & Accessories in ground tank Class 10K

Dia. 200 + Stang For Ground water tank pcs 2 - -


Gate Valve Dia. 100 pcs 2 - -
Butterfly valve dia 150 pcs 1 - -
Faucet pcs 2 - -

H.4 Pemipaan Air Bersih in Pump Room


Instalasi pipa utama air bersih domestik dengan PPR - PN10
termasuk gantungan/hanger, support, fitting dan aksesories :
di Ruang Pompa dan Ground Tank
- dia. 150 mm m 10 - -
- dia. 80 mm m 8 - -
- dia. 65 mm m 9 - -

H.5 TESTING & COMMISSIONING CLEAN WATER INSTALLATION


Pressure Test & Function Test - CW lot 1 - -

(H) = TOTAL PUMP ROOM INSTALLATION -

I FIRE FIGHTING INSTALATION SYSTEM

I.1 Pump
I.1.1 Electric Fire Pump (Untuk Fire Hydrant & Fire Sprinkler) Unit 1 - -
Type : Centrifugal Split Casing
Kapasitas : 700 USGPM
Total Head : 110 meter
Elec. Power : ± 70 KW , 380 V / 3 Ph / 50 Hz
Standard : NFPA Comply
Aksesories : Panel Kontrol, start Control, flow meter,
safety valve dan kelengkapan lainnya
sesuai standard pabrikan
Elektro Motor Mounted On The Baseplate & aksesories

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 43 of 46


HARGA SAT. TOTAL HARGA
NO. URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )
I.1.2 Diesel Fire Pump(Untuk Fire Hydrant & Fire Sprinkler) Unit 1 - -
Type : Centrifugal Split Casing + Diesel Engine
Kapasitas :750 USGPM
Total Head : 110 meter
Power : ± 120 HP
Standard : NFPA Comply
Aksesories : Panel Kontrol, starter, battery, flow meter,
safety valve dan kelengkapan lainnya
sesuai standard pabrikan
Heat Exchanger Cooling System
Lead Acid Batteries With Rack and Cable
Standart Muffer ( Silincer & Flexible Connection)
Fuel Oil Tank
Battery Charge ( Buil In The Controller)
Over Speed Shutdown Protection
Double Solenoid Stater
Lengkap dengan Panel Kontrol NFPA Standard
dan aksesories lainnya sesuai standar yang sudah ditentukan

I.1.3 Jockey Fire Pump (Untuk Fire Hydrant & Fire Sprinkler) Unit 1 - -
Type : Vertikal Multistage In Line
Kapasitas : 25 GPM
Total Head : 120 meter
Elec. Power : 3 KW, 380 V / 3 Ph / 50 Hz
Standard : NFPA Comply
C/W: Panel Control & Accessories

I.2 Inst. Riser Fire Hydrant & Sprinkler (Pump Room)

Instalasi pipa utama dengan pipa Black steel Sch. 40


termasuk fitting dan aksesoriesnya :
- dia. 250 mm Header include Blank flange m 5 - -
- dia. 200 mm m 4 - -
- dia. 150 mm m 10 - -
- dia. 100 mm m 8 - -
- dia. 50 mm m 4 - -

Katup - katup dan kelengkapannya :


Gate Valve OS & Y class 16K :
- dia. 150 mm m 9 - -
- dia. 100 mm m 3 - -
- dia. 50 mm m 2 - -

Check Valve 16 K :
- dia. 150 mm unit 2 - -
- dia. 50 mm unit 1 - -

Strainer 16 K :
- dia. 150 mm unit 2 - -
- dia. 50 mm unit 1 - -

Safety Valve 16 K
- dia. 100 mm unit 1 - -

Flow Meter
- dia. 100 mm unit 1 - -

Foot Valve + Saringan


- dia. 150 mm unit 2 - -
- dia. 50 mm unit 1 - -

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 44 of 46


HARGA SAT. TOTAL HARGA
NO. URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )
Fleksible Joint 20 K
- dia. 150 mm unit 4 - -
- dia. 50 mm unit 2 - -

Pressure Gauge + Valve unit 6 - -


Pressure Switch unit 3 - -
Pressure Tank kap. 500 L (mild steel) unit 1 - -

I.3 FIRE EXTINGUISER


CO2 Cap. 25 kg include bracket & accesories unit 1 - -

I.4 LIGHTING, EXHAUST FAN & RECEPTACLE & Power Panel


GMS TP LED 1x36 watt ACR pcs 14 - -
Double switch pcs 4 - -
Socket Outlet 200 VA pcs 6 - -
Exhaust fan Industrial type unit 3 - -
Installation Cable NYM 3 x 2.5 mm² for Lamp point 27 - -
SDP. Pump House unit 1 - -
Cable Feeder From PDTR NYY 4x50 mm m 25 - -

I.5 TESTING & COMMISSIONING FIRE FIGHTING INSTALATION


Pressure Test & Function Test - FF Lot 1 - -

(I) = TOTAL FIRE FIGHTING INSTALLATION -

J DEEP WELL
1 Pekerjaan Persiapan
Mobilisasi dan Demobilisasi peralatan & tenaga ahli ls 1.00 - -
Pekerjaan persiapan ls 1.00 - -
Pekerjaan Pengeboran dan pemasangan Pipa (kedalaman 200m)
Geo listrik lot 1.00 - -
Biaya Boring dia 150 mm m 145.00 - -
Biaya Boring dia 200 mm m 55.00 - -
Biaya pumping test/loging test lot 1.00 - -
Pembuatan bak dan tutup 1x1m bh 1.00 - -
Koral jagung lot 1.00 - -
Check valve dia 65 mm bh 1.00 - -
Saringan Stainless stell dia 100 mm bh 3.00 - -
Pipa Tegak GIP dia 65 mm m 55.00 - -
Pipa Casing GIP dia 100 mm m 55.00 - -
Pipa Casing GIP dia 150 mm m 105.00 - -
Isolasi cor water proof lot 1.00 - -
Kabel sling 6mm2 ls 1.00 - -
Kabel NYYHY 3x1,5 mm2 dari P kontrol ke wlc deep well m 90.00 - -
Muka air statis dan dinamis
Kabel power NYFGBY 4x66mm dari P kontrol Ke pompa deep well m 110.00 - -
WLC Pompa Deep Well unit 1.00 - -
Pembuatan saluran dan angkat lumpur lot 1.00 - -
Dan pembersihan akhir
Panel Kontrol depp well (out door type) bh 1.00 - -
Pengadaan Pompa unit 1.00 - -
Daya : 4 KW
Kapasitas : 150 liter/menit
Total Head : 200 m
Instalasi dari deep well ke ground tank
Pipa GIP 65 mm m 103.00 - -
Bak Kontrol bh 1.00 - -
Gate valve Dia 65 mm bh 2.00 - -
Fitting dan material bantu lot 1.00 - -
Pekerjaan elektrikal
Kabel NYFGBY 4x6 mm2 dari panel kontrol ke PP - DW m 100.00 - -
Kabel NYYHY 3x1,5 mm2 dari panel kontrol ke WLC di Ground tank m 100.00 - -
WLC di Ground tank lot 1.00 - -
Biaya perijinan dan test mutu air ls 1.00 - -

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 45 of 46


HARGA SAT. TOTAL HARGA
NO. URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )

(J ) = TOTAL DEEP WELL -

TOTAL MECHANICAL -

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 46 of 46

Anda mungkin juga menyukai