II. MEKANIKAL
2.A PEKERJAAN INSTALASI AIR BERSIH -
2.B PEKERJAAN INSTALASI AIR KOTOR -
2.C PEKERJAAN INSTALASI AIR BEKAS -
2.D PEKERJAAN INSTALASI AIR HUJAN -
2.E PEKERJAAN INSTALASI PEMADAM KEBAKARAN -
2.F PEKERJAAN TATA UDARA -
2.G PEKERJAAN LIFT -
2.H PEKERJAAN INSTALASI RUMAH POMPA -
2.I PEKERJAAN SISTEM PEMADAM KEBAKARAN -
2.J PEKERJAAN DEEP WELL -
A ELECTRICAL
F INSTALASI PROYEKTOR
F. 1 1st Floor
1 Socket outlet 200VA for proyektor pcs 2 - -
2 Installation Cable NYM 3 x 2.5 mm² for Socket Outlet 200 VA point 2 - -
3 VGA outlet, HDMI outlet pcs 2 - -
4 Instalasi dengan kabel VGA dan HDMI ke outlet/laptop dalam conduit PVC HI dia. 20 point 2 - -
F. 2 2nd Floor
1 Socket outlet 200VA for proyektor pcs 6 - -
2 Installation Cable NYM 3 x 2.5 mm² for Socket Outlet 200 VA point 6 - -
3 VGA outlet, HDMI outlet pcs 6 - -
4 Instalasi dengan kabel VGA dan HDMI ke outlet/laptop dalam conduit PVC HI dia. 20 point 6 - -
F. 3 4th Floor
1 Socket outlet 200VA for proyektor pcs 5 - -
2 Installation Cable NYM 3 x 2.5 mm² for Socket Outlet 200 VA point 5 - -
3 VGA outlet, HDMI outlet pcs 5 - -
4 Instalasi dengan kabel VGA dan HDMI ke outlet/laptop dalam conduit PVC HI dia. 20 point 5 - -
F. 5 5th Floor
1 Socket outlet 200VA for proyektor pcs 6 - -
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 19 of 46
HARGA SAT. TOTAL HARGA
NO. URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )
2 Installation Cable NYM 3 x 2.5 mm² for Socket Outlet 200 VA point 6 - -
3 VGA outlet, HDMI outlet pcs 6 - -
4 Instalasi dengan kabel VGA dan HDMI ke outlet/laptop dalam conduit PVC HI dia. 20 point 6 - -
H POWER HOUSE
H.3 GROUNDING
1 BCC 4x120 mm² m 15 - -
2 BCC 4 mm2 m 10 - -
3 Grounding Installation Panel TR (Resistansi Max 5 Ohm) Lot 6 - -
Pengadaan dan pemasangan sistim sesuai dengan gambar & Spesifikasi Teknis
2 Pengadaan dan pemasangan pipa solar jenis black steel sch 40 lengkap dengan 1 - -
valve-valve, fuel oil meter, water sparator, termasuk dengan material sambungan,
penggantung, klem, bracket dan semua aksesoris pemasangan seperti diuraikan
pada spesifikasi teknis dan gambar
A.2.1 Taman
PPR-PN10
1 PPR dia. 25 mm m 67 - -
2 PPR dia. 20 mm m 81 - -
3 PPR dia. 15 mm2 m 54 - -
4 Gate Valve dia.25 mm2 pcs 1 - -
5 Excavation & Back Filling m 202 - -
Supporting Material
1 Fitting for Pipe - CW lot 1 - -
2 Hanger Support - CW lot 1 - -
D.2 FIXTURES
1 Roof Drain dia.4 inch pcs 27 - -
Supporting Material
1 Fitting for Pipe - RW lot 1 - -
2 Hanger Support - RW lot 1 - -
D.3 Gutter include cover or grille m Civil Scoope
D.4 Box Control unit 27 Civil Scoope
E.2 PEMIPAAN SITE (OUT DOOR HYDRANT) & RISER FROM PUMP ROOM
Black Steel Pipe Sch 40
1 Black steel pipe sch 40 dia. 150mm m 153 - -
2 Black steel pipe sch 40 dia. 100mm m 180 - -
3 Excavation & Back Filling m 333 - -
Supporting Material
1 Fitting for Pipe - CW lot 1 - -
2 Hanger Support - CW lot 1 - -
VALVE
1 BCV 4" unit 1 - -
2 Gate Valve diameter 3" 16k unit 1 - -
3 Landing Valve diameter 2 1/2" 16k unit 1 - -
VALVE
1 BCV 4" unit 1 - -
2 Gate Valve diameter 3" 16k unit 1 - -
3 Landing Valve diameter 2 1/2" 16k unit 4 - -
4 Gate Valve diameter 1" 16k unit 2 - -
5 Sight Glass unit 1 - -
6 Flow switch Dia. 3" unit 1 - -
7 Pressure Gauge + Valve unit 2 - -
Supporting Material
1 Fitting for Pipe - FF lot 1 - -
2 Hanger Support - FF lot 1 - -
VALVE
1 BCV 4" unit 1 - -
2 Gate Valve diameter 3" 16k unit 1 - -
3 Landing Valve diameter 2 1/2" 16k unit 1 - -
4 Gate Valve diameter 1" 16k unit 4 - -
5 Sight Glass unit 1 - -
6 Flow switch Dia. 4" unit 1 - -
7 Pressure Gauge + Valve unit 2 - -
Supporting Material
1 Fitting for Pipe - FF lot 1 - -
2 Hanger Support - FF lot 1 - -
VALVE
1 BCV 4" unit 1 - -
2 Gate Valve diameter 3" 16k unit 1 - -
3 Landing Valve diameter 2 1/2" 16k unit 1 - -
4 Gate Valve diameter 1" 16k unit 4 - -
5 Sight Glass unit 1 - -
6 Flow switch Dia. 4" unit 1 - -
7 Pressure Gauge + Valve unit 2 - -
Supporting Material
1 Fitting for Pipe - FF lot 1 - -
2 Hanger Support - FF lot 1 - -
VALVE
1 BCV 4" unit 1 - -
2 Gate Valve diameter 3" 16k unit 1 - -
3 Landing Valve diameter 2 1/2" 16k unit 1 - -
4 Gate Valve diameter 1" 16k unit 2 - -
5 Sight Glass unit 1 - -
6 Flow switch Dia. 3" unit 1 - -
7 Pressure Gauge + Valve unit 2 - -
Supporting Material
1 Fitting for Pipe - FF lot 1 - -
2 Hanger Support - FF lot 1 - -
E.8 ON SHAFT
1 Black steel pipe sch 40 dia. 150mm for Hydrant & Sprinkler m 45 - -
2 Black steel pipe sch 40 dia. 50mm for Drain m 26 - -
Supporting Material
1 Fitting for Pipe - FF lot 1 - -
2 Hanger Support - FF lot 1 - -
F.1.1.2 Instalation
1 Refrigrant Pipe include isolation 1" m 150 - -
2 Drain Pipe Dia. 25 mm include isolation unit 150 - -
3 Wired remote control unit 10 - -
4 Installation Cable (Indoor & Outdoor) in conduit pipe Point 10 - -
5 Refrigrant Gas lot 1 - -
6 Support material Indoor, Outdoor & Testing Commisioning unit 10 - -
F.1.2 MEZZANINE
F.1.2.1 Single Split Wall Mounted R410
1 Mezzanine 1 & 2 unit 4 - -
Capacity 14300 BTU/H
F.1.2.2 Instalation
1 Refrigrant Pipe include isolation 1" m 4 - -
F.1.3.2 Instalation
1 Refrigrant Pipe include isolation 1" m 26 - -
2 Drain Pipe Dia. 25 mm include isolation unit 26 - -
3 Wired remote control unit 26 - -
4 Installation Cable (Indoor & Outdoor) in conduit pipe Point 26 - -
5 Refrigrant Gas lot 1 - -
6 Support material Indoor, Outdoor & Testing Commisioning unit 26 - -
F.1.4.2 Instalation
1 Refrigrant Pipe include isolation 1" m 27 - -
2 Drain Pipe Dia. 25 mm include isolation unit 27 - -
3 Wired remote control unit 27 - -
4 Installation Cable (Indoor & Outdoor) in conduit pipe Point 27 - -
5 Refrigrant Gas lot 1 - -
6 Support material Indoor, Outdoor & Testing Commisioning unit 27 - -
F.1.5.2 Instalation
1 Refrigrant Pipe include isolation 1" m 24 - -
2 Drain Pipe Dia. 25 mm include isolation unit 24 - -
3 Wired remote control unit 24 - -
4 Installation Cable (Indoor & Outdoor) in conduit pipe Point 24 - -
5 Refrigrant Gas lot 1 - -
6 Support material Indoor, Outdoor & Testing Commisioning unit 24 - -
F.1.6.2 Instalation
1 Refrigrant Pipe include isolation 1" m 24 - -
2 Drain Pipe Dia. 25 mm include isolation unit 24 - -
3 Wired remote control unit 24 - -
4 Installation Cable (Indoor & Outdoor) in conduit pipe Point 24 - -
5 Refrigrant Gas lot 1 - -
6 Support material Indoor, Outdoor & Testing Commisioning unit 24 - -
G ELEVATOR (LIFT)
G.1 Passenger Lift Unit (Merk Hermes)
- P (1000kg) 15 person unit 2 - -
- Speed : 1,6 m/s
- Drive system : ACVF Gearless
- Non Machine room
- Control : Touch sensitive Buttons
- Operation control : Simplex
- Door Type : 2 Panel center opening
- Door Quantity :5
- Car Floor : Artificial Granite Tile
- Floor served : 1~4
- Automatic Rescue Device
- Pit lift :2m
- Include Interfacing fire alarm
I.1 Pump
I.1.1 Electric Fire Pump (Untuk Fire Hydrant & Fire Sprinkler) Unit 1 - -
Type : Centrifugal Split Casing
Kapasitas : 700 USGPM
Total Head : 110 meter
Elec. Power : ± 70 KW , 380 V / 3 Ph / 50 Hz
Standard : NFPA Comply
Aksesories : Panel Kontrol, start Control, flow meter,
safety valve dan kelengkapan lainnya
sesuai standard pabrikan
Elektro Motor Mounted On The Baseplate & aksesories
I.1.3 Jockey Fire Pump (Untuk Fire Hydrant & Fire Sprinkler) Unit 1 - -
Type : Vertikal Multistage In Line
Kapasitas : 25 GPM
Total Head : 120 meter
Elec. Power : 3 KW, 380 V / 3 Ph / 50 Hz
Standard : NFPA Comply
C/W: Panel Control & Accessories
Check Valve 16 K :
- dia. 150 mm unit 2 - -
- dia. 50 mm unit 1 - -
Strainer 16 K :
- dia. 150 mm unit 2 - -
- dia. 50 mm unit 1 - -
Safety Valve 16 K
- dia. 100 mm unit 1 - -
Flow Meter
- dia. 100 mm unit 1 - -
J DEEP WELL
1 Pekerjaan Persiapan
Mobilisasi dan Demobilisasi peralatan & tenaga ahli ls 1.00 - -
Pekerjaan persiapan ls 1.00 - -
Pekerjaan Pengeboran dan pemasangan Pipa (kedalaman 200m)
Geo listrik lot 1.00 - -
Biaya Boring dia 150 mm m 145.00 - -
Biaya Boring dia 200 mm m 55.00 - -
Biaya pumping test/loging test lot 1.00 - -
Pembuatan bak dan tutup 1x1m bh 1.00 - -
Koral jagung lot 1.00 - -
Check valve dia 65 mm bh 1.00 - -
Saringan Stainless stell dia 100 mm bh 3.00 - -
Pipa Tegak GIP dia 65 mm m 55.00 - -
Pipa Casing GIP dia 100 mm m 55.00 - -
Pipa Casing GIP dia 150 mm m 105.00 - -
Isolasi cor water proof lot 1.00 - -
Kabel sling 6mm2 ls 1.00 - -
Kabel NYYHY 3x1,5 mm2 dari P kontrol ke wlc deep well m 90.00 - -
Muka air statis dan dinamis
Kabel power NYFGBY 4x66mm dari P kontrol Ke pompa deep well m 110.00 - -
WLC Pompa Deep Well unit 1.00 - -
Pembuatan saluran dan angkat lumpur lot 1.00 - -
Dan pembersihan akhir
Panel Kontrol depp well (out door type) bh 1.00 - -
Pengadaan Pompa unit 1.00 - -
Daya : 4 KW
Kapasitas : 150 liter/menit
Total Head : 200 m
Instalasi dari deep well ke ground tank
Pipa GIP 65 mm m 103.00 - -
Bak Kontrol bh 1.00 - -
Gate valve Dia 65 mm bh 2.00 - -
Fitting dan material bantu lot 1.00 - -
Pekerjaan elektrikal
Kabel NYFGBY 4x6 mm2 dari panel kontrol ke PP - DW m 100.00 - -
Kabel NYYHY 3x1,5 mm2 dari panel kontrol ke WLC di Ground tank m 100.00 - -
WLC di Ground tank lot 1.00 - -
Biaya perijinan dan test mutu air ls 1.00 - -
TOTAL MECHANICAL -