BILL OF QUANTITY

PROYEK : PEMBANGUNAN GEDUNG DENSUS


LOKASI : RENCANA ANGGARAN BIAYA PEKERJAAN MEKANIKAL & ELEKTRIKAL
PEKERJAAN : PLUMBING, VAC, PEMADAM KEBAKARAN, ELEKTRIKAL, ELEKTRONIK.

TOTAL HARGA
NO. URAIAN PEKERJAAN
( Rp. )

D. REKAPITULASI PEKERJAAN MEKANIKAL & ELEKTRIKAL

D.I. PEKERJAAN VENTILASI & TATA UDARA GEDUNG 271,479,000

D.II. PEKERJAAN PLAMBING 1,756,460,000

D.III. PEKERJAAN PEMADAM KEBAKARAN 13,600,000

D.IV. PEKERJAAN ELEKTRIKAL 1,345,669,000

D.V. PEKERJAAN GENSET 258,600,000

D.VI. PEKERJAAN ELEKTRONIK 469,352,520

D.VI.1 PEKERJAAN FIRE ALARM 190,907,000

D.VI.2 PEKERJAAN MATV 246,155,000

D.VI.3 PEKERJAAN TATA SUARA 32,290,520

TOTAL 4,115,160,520

RAB-MEP (AC) 1
BILL OF QUANTITY
PROYEK : PEMBANGUNAN GEDUNG DENSUS
LOKASI : RENCANA ANGGARAN BIAYA PEKERJAAN MEKANIKAL & ELEKTRIKAL
PEKERJAAN : PLUMBING, VAC, PEMADAM KEBAKARAN, ELEKTRIKAL, ELEKTRONIK.

HARGA SATUAN TOTAL HARGA


NO. URAIAN PEKERJAAN SAT. VOL.
( Rp. ) ( Rp. )

D.I. PEKERJAAN VAC

A. Peralatan Utama VAC

A.1 Peralatan Utama AC SPLIT

Pengadaan dan pemasangan Peralatan Utama AC Split, lengkap terpasang


dengan alat bantu dan accessories yang diperlukan sesuai gambar
perencanaan dan spesifikasi teknis.

1 Lantai 1

a. AC Split OU/IU - 1.1,1.2 unit 44 Oleh Pihak lain


Kapasitas : 9,000 Btu/h
Data Listrik : 220 V/1 Ph/50 Hz
Lokasi : Setiap Hunian Lantai

Sub Total - 1 -

2 Lantai 2

a AC Split OU/IU - 2.1,2.2 unit 44 Oleh Pihak lain


Kapasitas : 9,000 Btu/h
Data Listrik : 220 V/1 Ph/50 Hz
Lokasi : Setiap Hunian Lantai

Sub Total - 2 -

3 Lantai 3

a AC Split OU/IU - 3.1,3.2 unit 44 Oleh Pihak lain


Kapasitas : 9,000 Btu/h
Data Listrik : 220 V/1 Ph/50 Hz
Lokasi : Setiap Hunian Lantai

Sub Total - 3 -

Sub Total A.1

A.2 Peralatan Utama FAN

1 Lantai 1

a. Exhaust Fan Ruang Pompa (EF-RP) unit 1 1,500,000 1,500,000


Kapasitas : 930 Cfm
Data Listrik : 220 V/1 Ph/50 Hz
Type Fan : Wall
Fungsi : Exhaust
Ruang Yg. Dilayani : Ruang Pompa
Lokasi : Lantai 1

RAB-MEP (AC) 2
BILL OF QUANTITY
PROYEK : PEMBANGUNAN GEDUNG DENSUS
LOKASI : RENCANA ANGGARAN BIAYA PEKERJAAN MEKANIKAL & ELEKTRIKAL
PEKERJAAN : PLUMBING, VAC, PEMADAM KEBAKARAN, ELEKTRIKAL, ELEKTRONIK.

HARGA SATUAN TOTAL HARGA


NO. URAIAN PEKERJAAN SAT. VOL.
( Rp. ) ( Rp. )

b. Exhaust Fan (EF-T) unit 44 1,000,000 44,000,000


Kapasitas : 260 Cfm
Daya Motor : 0.1 KW
Data Listrik : 220 V/1 Ph/50 Hz
Type Fan : Wall
Fungsi : Exhaust
Ruang Yg. Dilayani : Toilet
Lokasi : Lantai 1

Sub Total - 1 45,500,000

2 Lantai 2

a Exhaust Fan (EF-T) unit 44 1,000,000 44,000,000


Kapasitas : 260 Cfm
Daya Motor : 0.1 KW
Data Listrik : 220 V/1 Ph/50 Hz
Type Fan : Wall
Fungsi : Exhaust
Ruang Yg. Dilayani : Toilet
Lokasi : Lantai 1

Sub Total - 2 44,000,000

3 Lantai 3.

a Exhaust Fan (EF-T) unit 44 1,000,000 44,000,000


Kapasitas : 260 Cfm
Daya Motor : 0.1 KW
Data Listrik : 220 V/1 Ph/50 Hz
Type Fan : Wall
Fungsi : Exhaust
Ruang Yg. Dilayani : Toilet
Lokasi : Lantai 1

Sub Total - 3 44,000,000

Sub Total A.2 133,500,000

Total A (A.1 + A.2) 133,500,000

B. Pekerjaan Instalasi VAC

B.1 Lantai 1

1 Pemipaan AC Split

1.1 Pipa Refrigerant

Pengadaan dan pemasangan Pipa Refrigerant bahan pipa Tembaga


berisolasi, lengkap dengan alat bantu dan accessories yang diperlukan
sesuai dengan gambar perencanaan dan spesifikasi teknis.

- Pipa Refrigerant Ø 9,52 m 374 78,000 29,172,000


- Pipa Refrigerant Ø 6,35 m 105 51,000 5,355,000

1.2 Pipa Drain

Pengadaan dan pemasangan Pipa Drain bahan pipa PVC class AW


berisolasi, lengkap dengan alat bantu dan accessories yang diperlukan
sesuai dengan gambar perencanaan dan spesifikasi teknis.

- Pipa Drain Ø 20 m 44 49,000 2,156,000


- Pipa Drain Ø 50 m 95 98,000 9,310,000

Sub Total B.1 45,993,000

RAB-MEP (AC) 3
BILL OF QUANTITY
PROYEK : PEMBANGUNAN GEDUNG DENSUS
LOKASI : RENCANA ANGGARAN BIAYA PEKERJAAN MEKANIKAL & ELEKTRIKAL
PEKERJAAN : PLUMBING, VAC, PEMADAM KEBAKARAN, ELEKTRIKAL, ELEKTRONIK.

HARGA SATUAN TOTAL HARGA


NO. URAIAN PEKERJAAN SAT. VOL.
( Rp. ) ( Rp. )

B.2. Lantai 2

1 Pemipaan AC Split

1.1 Pipa Refrigerant

Pengadaan dan pemasangan Pipa Refrigerant bahan pipa Tembaga


berisolasi, lengkap dengan alat bantu dan accessories yang diperlukan
sesuai dengan gambar perencanaan dan spesifikasi teknis.

- Pipa Refrigerant Ø 9,52 m 374 78,000 29,172,000


- Pipa Refrigerant Ø 6,35 m 105 51,000 5,355,000

1.2 Pipa Drain

Pengadaan dan pemasangan Pipa Drain bahan pipa PVC class AW


berisolasi, lengkap dengan alat bantu dan accessories yang diperlukan
sesuai dengan gambar perencanaan dan spesifikasi teknis.

- Pipa Drain Ø 20 m 44 49,000 2,156,000


- Pipa Drain Ø 50 m 95 98,000 9,310,000

Sub Total B.2 45,993,000

B.3. Lantai 3.

1 Pemipaan AC Split

1.1 Pipa Refrigerant

Pengadaan dan pemasangan Pipa Refrigerant bahan pipa Tembaga


berisolasi, lengkap dengan alat bantu dan accessories yang diperlukan
sesuai dengan gambar perencanaan dan spesifikasi teknis.
- Pipa Refrigerant Ø 9,52 m 374 78,000 29,172,000
- Pipa Refrigerant Ø 6,35 m 105 51,000 5,355,000

1.2 Pipa Drain

Pengadaan dan pemasangan Pipa Drain bahan pipa PVC class AW


berisolasi, lengkap dengan alat bantu dan accessories yang diperlukan
sesuai dengan gambar perencanaan dan spesifikasi teknis.
- Pipa Drain Ø 20 m 44 49,000 2,156,000
- Pipa Drain Ø 50 m 95 98,000 9,310,000

Sub Total B.3 45,993,000

Sub Total B (B.1 s/d B.3) 137,979,000

TOTAL PEKERJAAN VAC 271,479,000

RAB-MEP (AC) 4
BILL OF QUANTITY
PROYEK : PEMBANGUNAN GEDUNG DENSUS
LOKASI : RENCANA ANGGARAN BIAYA PEKERJAAN MEKANIKAL & ELEKTRIKAL
PEKERJAAN : PLUMBING, VAC, PEMADAM KEBAKARAN, ELEKTRIKAL, ELEKTRONIK.

HARGA SATUAN TOTAL HARGA


NO. URAIAN PEKERJAAN SAT. VOL.
( Rp. ) ( Rp. )

D.II. PEKERJAAN PLAMBING

A. Peralatan Utama Plambing

A.1 Peralatan Utama Air Bersih

Pengadaan dan pemasangan Peralatan Utama Air Bersih, lengkap terpasang dengan
alat bantu dan accessories yang diperlukan sesuai gambar perencanaan dan
spesifikasi teknis.

1 Pompa Raw Water unit 2 30,000,000 60,000,000


Kapasitas : 100 Liter/Menit
Total Head : 20 M
Data Listrik : 380 V/3 Ph/50 Hz
Type : Vertical Multi stage
Operasi : 1 Operasi, 1 Stand By ( Lengkap Panel )
Lokasi : R. Pompa.
Jumlah : 2 Unit

2 Pompa Deep Well (DW - 0A) c/w pembuatan sumur, instalasi set 1 240,000,000 240,000,000
Kapasitas : 12 M³/H
Total Head : 80 M
Daya Listrik : 7.5 KW
Data Listrik : 380 V/3 Ph/50 Hz
Type : Vertical Submersible
Operasi : Star/Stop Otomatis - Continus Operation
Lokasi : Site Plan

3 Pompa Transfer unit 2 30,000,000 60,000,000


Kapasitas : 200 Liter/Menit
Total Head : 50 M
Data Listrik : 380 V/3 Ph/50 Hz
Type : Horizontal Multistage
Operasi : 1 Operasi, 1 Stand By ( Lengkap Panel )
Lokasi : R. Pompa.
Jumlah : 2 Unit

4 Pompa Distribusi ke unit Set 2 60,000,000 120,000,000


Kapasitas : 100 Liter/Menit
Total Head : 50 M
Data Listrik : 380 V/3 Ph/50 Hz
Type : Packeg Booster Pump Multi stage
Operasi : Parallel Alternate
Lokasi : Lantai Atap

5 Tanki Air Bersih (GWT-01/02) unit 1 By Other


Kapasitas : 40 M³
Material : Concrete

6 Sand Filter (SF) unit 1 20,000,000.00 20,000,000


Kapasitas : 12 M³/Jam, 3 Bar
Material : FRP
Operasi : Manual Back Wass
Lokasi : Ruang Pompa

7 Carbon Filter (CF) unit 1 22,000,000.00 22,000,000


Kapasitas : 12 M³/Jam, 3 Bar
Material : FRP
Operasi : Manual Back Wass
Lokasi : Ruang Pompa

8 Priming Tank unit 1 10,000,000.00 10,000,000


Kapasitas : 100 Liter
Material : Stell
Lokasi : Ruang Pompa

Sub Total - A.1 532,000,000

RAB-MEP (PL) 5
BILL OF QUANTITY
PROYEK : PEMBANGUNAN GEDUNG DENSUS
LOKASI : RENCANA ANGGARAN BIAYA PEKERJAAN MEKANIKAL & ELEKTRIKAL
PEKERJAAN : PLUMBING, VAC, PEMADAM KEBAKARAN, ELEKTRIKAL, ELEKTRONIK.

HARGA SATUAN TOTAL HARGA


NO. URAIAN PEKERJAAN SAT. VOL.
( Rp. ) ( Rp. )

A.2 Peralatan Utama Air Bekas, Kotor dan Vent

Pengadaan dan pemasangan Peralatan Utama Air Bekas, Kotor dan Vent bahan pipa
PVC class AW, lengkap terpasang dengan alat bantu dan accessories yang
diperlukan sesuai gambar perencanaan dan spesifikasi teknis.

1 Sewage Treatment Plant (STP) - Extended Aeration System. set 1 250,000,000 250,000,000
Kapasitas : 34 m³/hari
Type : Tabung

4 Struktur STP lot 1 Lingkup Pekerjaan Sipil

Sub Total - A.2 250,000,000


Sub Total - A (A.1 + A.2) 782,000,000

B. Pekerjaan Instalasi Plambing

B.1 Site Plan

1 Pekerjaan Instalasi Air Bersih

a Pemipaan Air Bersih

Pengadaan dan pemasangan Pipa Air Bersih bahan pipa PPR PN 10, lengkap
terpasang dengan alat bantu dan accessories yang diperlukan sesuai gambar
perencanaan dan spesifikasi teknis.

- Pipa Air Bersih Ø 65 (dari PDAM) m 200 400,000 80,000,000


- Pipa Air Bersih Ø 65 (dari Deep Well) m 20 400,000 8,000,000
- Pipa AB Ø 50 (dari R. Pompa ke Riser ) m 176 310,000 54,560,000

b Valve-Valve

Pengadaan dan pemasangan Valve-valve, lengkap terpasang dengan alat bantu dan
accessories yang diperlukan sesuai gambar perencanaan dan spesifikasi teknis.

- Gate Valve Ø 65 bh 5 880,000 4,400,000


- Check Valve Ø 65 bh 1 1,200,000 1,200,000
- Strainer Ø 65 bh 1 1,200,000 1,200,000
- Flow Meter Ø 65 (Meteran Air) bh 1 400,000 400,000

2 Pekerjaan Instalasi Air Bekas, Kotor dan Vent

a Pemipaan Air Bekas, Kotor dan Vent

Pengadaan dan pemasangan pipa Air Bekas, Kotor dan Vent bahan pipa PVC class
AW, lengkap terpasang dengan alat bantu dan accessories yang diperlukan sesuai
gambar perencanaan dan spesifikasi teknis.

- Pipa Air Kotor Ø 150 Ke STP m 200 115,000 23,000,000


- Pipa Air Bekas Ø 100 Ke STP m 200 115,000 23,000,000

b Floor Drain, Bak Kontrol, GV

Pengadaan dan pemasangan Floor Drain, Bak Kontrol, GV, lengkap terpasang
dengan alat bantu dan accessories yang diperlukan sesuai gambar perencanaan dan
spesifikasi teknis.

- Bak Kontrol bh 4 By Cipil


Sub Total - B.1 195,760,000

RAB-MEP (PL) 6
BILL OF QUANTITY
PROYEK : PEMBANGUNAN GEDUNG DENSUS
LOKASI : RENCANA ANGGARAN BIAYA PEKERJAAN MEKANIKAL & ELEKTRIKAL
PEKERJAAN : PLUMBING, VAC, PEMADAM KEBAKARAN, ELEKTRIKAL, ELEKTRONIK.

HARGA SATUAN TOTAL HARGA


NO. URAIAN PEKERJAAN SAT. VOL.
( Rp. ) ( Rp. )

B.2 Lantai 1

Unit Hunian

1 Pekerjaan Instalasi Air Bersih

a Pemipaan Air Bersih

Pengadaan dan pemasangan Pipa Air Bersih bahan pipa PPR PN 10, lengkap
terpasang dengan alat bantu dan accessories yang diperlukan sesuai gambar
perencanaan dan spesifikasi teknis.

- Pipa AB Ø 50 (Riser Air Bersih) m 5 310,000 1,550,000


- Pipa AB Ø 40 m 2 215,000 430,000
- Pipa AB Ø 32 m 2 136,000 272,000
- Pipa AB Ø 25 m 1 136,000 136,000
- Pipa AB Ø 20 m 1 55,000 55,000
- Pipa AB Ø 15 m 12 40,000 480,000

b Valve-Valve

Pengadaan dan pemasangan Valve-valve, lengkap terpasang dengan alat bantu dan
accessories yang diperlukan sesuai gambar perencanaan dan spesifikasi teknis.

- Gate Valve Ø 32 bh 1 156,000 156,000

2 Pekerjaan Air Bekas, Kotor dan Vent

a Pipa Air Bekas, Kotor dan Vent

Pengadaan dan pemasangan pipa Air Bekas, Kotor dan Vent bahan pipa PVC class
AW, lengkap terpasang dengan alat bantu dan accessories yang diperlukan sesuai
gambar perencanaan dan spesifikasi teknis.

- Pipa AK Ø 100 (Riser AK) m 5 115,000 575,000


- Pipa AK Ø 100 m 5 115,000 575,000
- Pipa Air Bekas Ø 100 (Riser ABK) m 5 115,000 575,000
- Pipa Air Bekas Ø 80 m 3 77,000 231,000
- Pipa Air Bekas Ø 50 m 1 41,000 41,000
- Pipa Vent Ø 80 (Riser Vent) m 5 77,000 385,000
- Pipa Vent Ø 40 m 2 29,000 58,000
- Pipa Vent Ø 32 m 2 29,000 58,000

b FD, CO

Pengadaan dan pemasangan VD, CO, lengkap terpasang dengan alat bantu dan
accessories yang diperlukan sesuai gambar perencanaan dan spesifikasi teknis.

- Floor Drain Ø 100 bh 2 268,000 536,000


- FCO Ø 100 bh 1 228,000 228,000
- FCO Ø 50 bh 1 185,000 185,000

Sub Total 6,526,000

Total Lantai 1 143,572,000

RAB-MEP (PL) 7
BILL OF QUANTITY
PROYEK : PEMBANGUNAN GEDUNG DENSUS
LOKASI : RENCANA ANGGARAN BIAYA PEKERJAAN MEKANIKAL & ELEKTRIKAL
PEKERJAAN : PLUMBING, VAC, PEMADAM KEBAKARAN, ELEKTRIKAL, ELEKTRONIK.

HARGA SATUAN TOTAL HARGA


NO. URAIAN PEKERJAAN SAT. VOL.
( Rp. ) ( Rp. )

B.3 Lantai 2

Unit Hunian

1 Pekerjaan Instalasi Air Bersih

a Pemipaan Air Bersih

Pengadaan dan pemasangan Pipa Air Bersih bahan pipa PPR PN 10, lengkap
terpasang dengan alat bantu dan accessories yang diperlukan sesuai gambar
perencanaan dan spesifikasi teknis.

- Pipa AB Ø 50 (Riser Air Bersih) m 5 310,000 1,550,000


- Pipa AB Ø 40 m 2 215,000 430,000
- Pipa AB Ø 32 m 2 136,000 272,000
- Pipa AB Ø 25 m 1 136,000 136,000
- Pipa AB Ø 20 m 1 55,000 55,000
- Pipa AB Ø 15 m 12 40,000 480,000

b Valve-Valve

Pengadaan dan pemasangan Valve-valve, lengkap terpasang dengan alat bantu dan
accessories yang diperlukan sesuai gambar perencanaan dan spesifikasi teknis.

- Gate Valve Ø 32 bh 1 156,000 156,000

2 Pekerjaan Air Bekas, Kotor dan Vent

a Pemipaan Air Bekas, Kotor dan Vent

Pengadaan dan pemasangan pipa Air Bekas, Kotor dan Vent bahan pipa PVC class
AW, lengkap terpasang dengan alat bantu dan accessories yang diperlukan sesuai
gambar perencanaan dan spesifikasi teknis.

- Pipa AK Ø 100 (Riser AK) m 5 115,000 575,000


- Pipa AK Ø 100 m 5 115,000 575,000
- Pipa Air Bekas Ø 100 (Riser ABK) m 5 115,000 575,000
- Pipa Air Bekas Ø 80 m 3 77,000 231,000
- Pipa Air Bekas Ø 50 m 1 41,000 41,000
- Pipa Vent Ø 80 (Riser Vent) m 5 77,000 385,000
- Pipa Vent Ø 40 m 2 29,000 58,000
- Pipa Vent Ø 32 m 2 29,000 58,000

b Ffoor Drain

Pengadaan dan pemasangan Floor Drain, lengkap terpasang dengan alat bantu dan
accessories yang diperlukan sesuai gambar perencanaan dan spesifikasi teknis.

- Floor Drain Ø 100 bh 2 268,000 536,000


- FCO Ø 100 bh 1 228,000 228,000
- FCO Ø 50 bh 1 185,000 185,000

Sub Total 6,526,000

Total Lantai 2 143,572,000

RAB-MEP (PL) 8
BILL OF QUANTITY
PROYEK : PEMBANGUNAN GEDUNG DENSUS
LOKASI : RENCANA ANGGARAN BIAYA PEKERJAAN MEKANIKAL & ELEKTRIKAL
PEKERJAAN : PLUMBING, VAC, PEMADAM KEBAKARAN, ELEKTRIKAL, ELEKTRONIK.

HARGA SATUAN TOTAL HARGA


NO. URAIAN PEKERJAAN SAT. VOL.
( Rp. ) ( Rp. )

B.4 Lantai 3

Unit Hunian

1 Pekerjaan Instalasi Air Bersih

a Pemipaan Air Bersih

Pengadaan dan pemasangan Pipa Air Bersih bahan pipa PPR PN 10, lengkap
terpasang dengan alat bantu dan accessories yang diperlukan sesuai gambar
perencanaan dan spesifikasi teknis.

- Pipa AB Ø 50 (Riser Air Bersih) m 5 310,000 1,550,000


- Pipa AB Ø 40 m 2 215,000 430,000
- Pipa AB Ø 32 m 2 136,000 272,000
- Pipa AB Ø 25 m 1 136,000 136,000
- Pipa AB Ø 20 m 1 55,000 55,000
- Pipa AB Ø 15 m 12 40,000 480,000

b Valve-Valve

Pengadaan dan pemasangan Valve-valve, lengkap terpasang dengan alat bantu dan
accessories yang diperlukan sesuai gambar perencanaan dan spesifikasi teknis.

- Gate Valve Ø 32 bh 1 156,000 156,000


- Gate Valve Ø 50 bh 22 240,000 5,280,000

2 Pekerjaan Instalasi Air Bekas, Kotor dan Vent

a Pemipaan Air Bekas, Kotor dan Vent

Pengadaan dan pemasangan pipa Air Bekas, Kotor dan Vent bahan pipa PVC class
AW, lengkap terpasang dengan alat bantu dan accessories yang diperlukan sesuai
gambar perencanaan dan spesifikasi teknis.

- Pipa AK Ø 100 (Riser AK) m 5 115,000 575,000


- Pipa AK Ø 100 m 5 115,000 575,000
- Pipa Air Bekas Ø 100 (Riser ABK) m 5 115,000 575,000
- Pipa Air Bekas Ø 80 m 3 77,000 231,000
- Pipa Air Bekas Ø 50 m 1 41,000 41,000
- Pipa Vent Ø 80 (Riser Vent) m 5 77,000 385,000
- Pipa Vent Ø 40 m 2 29,000 58,000
- Pipa Vent Ø 32 m 2 29,000 58,000

b Floor Drain

Pengadaan dan pemasangan Floor Drain, lengkap terpasang dengan alat bantu dan
accessories yang diperlukan sesuai gambar perencanaan dan spesifikasi teknis.

- Floor Drain Ø 100 bh 2 268,000 536,000


- FCO Ø 100 bh 1 228,000 228,000
- FCO Ø 50 bh 1 185,000 185,000

Sub Total 11,806,000

Sub Total Hunian lantai 3 259,732,000

3 Pekerjaan Instalasi Air Bersih

- Pipa AB Ø 50 (Distribusi Ring lantai Atap ) m 200 310,000 62,000,000

Total Lantai 3 321,732,000

Sub Total - B (B.1 s/d B.4) 804,636,000

RAB-MEP (PL) 9
BILL OF QUANTITY
PROYEK : PEMBANGUNAN GEDUNG DENSUS
LOKASI : RENCANA ANGGARAN BIAYA PEKERJAAN MEKANIKAL & ELEKTRIKAL
PEKERJAAN : PLUMBING, VAC, PEMADAM KEBAKARAN, ELEKTRIKAL, ELEKTRONIK.

HARGA SATUAN TOTAL HARGA


NO. URAIAN PEKERJAAN SAT. VOL.
( Rp. ) ( Rp. )

C. PEKERJAAN AIR HUJAN

Lantai Atap

a Pemipaan Air Hujan

Pengadaan dan pemasangan pipa Air Hujan bahan pipa PVC class AW, lengkap
terpasang dengan alat bantu dan accessories yang diperlukan sesuai gambar
perencanaan dan spesifikasi teknis.

- Pipa Air Hujan Ø 100 (Riser s/d Site Plan) m 453 276,000 125,028,000

b Roof Drain

Pengadaan dan pemasangan Roof Drain, lengkap terpasang dengan alat bantu dan
accessories yang diperlukan sesuai gambar perencanaan dan spesifikasi teknis.

- Roof Drain Ø 100 bh 36 161,000 5,796,000

b Sumur Resapan kap bh 13 3,000,000 39,000,000

Sub Total - C 169,824,000

TOTAL PEKERJAAN PLAMBING 1,756,460,000

RAB-MEP (PL) 10
BILL OF QUANTITY
PROYEK : PEMBANGUNAN GEDUNG DENSUS
LOKASI : RENCANA ANGGARAN BIAYA PEKERJAAN MEKANIKAL & ELEKTRIKAL
PEKERJAAN : PLUMBING, VAC, PEMADAM KEBAKARAN, ELEKTRIKAL, ELEKTRONIK.

HARGA SATUAN TOTAL HARGA


NO. URAIAN PEKERJAAN SAT. VOL.
( Rp. ) ( Rp. )

D.III. PEKERJAAN PEMADAM KEBAKARAN

B.1 Fire Exthinguiser ( FE )

Pengadaan dan pemasangan FE lengkap terpasang dengan alat bantu dan


accessories lain yang diperlukan sesuai gambar perencanaan & spesifikasi
teknis.

1 Lantai 1
- Fire Extinguisher (FE) 3 Kg (Dry Chemical) bh 5 800,000 4,000,000
- Fire Extinguisher (FE) 6,8 Kg (Dry Chemical)/Ruang Pompa bh 1 1,600,000 1,600,000

2 Lantai 2
- Fire Extinguisher (FE) 3 Kg (Dry Chemical) bh 5 800,000 4,000,000

3 Lantai 3
- Fire Extinguisher (FE) 3 Kg (Dry Chemical) bh 5 800,000 4,000,000

Sub Total - B.3 13,600,000

TOTAL PEKERJAAN PEMADAM KEBAKARAN 13,600,000

RAB-MEP (PK) 11
BILL OF QUANTITY
PROYEK : PEMBANGUNAN GEDUNG DENSUS
LOKASI : RENCANA ANGGARAN BIAYA PEKERJAAN MEKANIKAL & ELEKTRIKAL
PEKERJAAN : PLUMBING, VAC, PEMADAM KEBAKARAN, ELEKTRIKAL, ELEKTRONIK.

HARGA SATUAN TOTAL HARGA


NO. URAIAN PEKERJAAN SAT. VOL.
( Rp. ) ( Rp. )

D.IV. PEKERJAAN ELEKTRIKAL

A. Peralatan Utama

Pengadaan dan pemasangan Peralatan Utama Elektrikal, lengkap terpasang


dengan alat bantu dan accessories yang diperlukan sesuai gambar
perencanaan dan spesifikasi teknis.

1 P. Utama unit 1 100,000,000 100,000,000


2 Capacitor Bank 50 KVAR c/w APFR unit 1 30,000,000 30,000,000
3 P - DW unit 1 8,000,000 8,000,000
4 P.POMPA AIR BERSIH unit 1 25,000,000 25,000,000
5 PP - STP unit 1 15,000,000 15,000,000
6 P - ELC unit 1 5,000,000 5,000,000
7 P-1A,P-1B unit 2 20,000,000 40,000,000
8 P-2A,P-2B unit 2 20,000,000 40,000,000
9 P-3A,P-3B unit 2 20,000,000 40,000,000
10 P-R.GENSET unit 1 10,000,000 10,000,000

Sub Total - A 313,000,000

B. Pekerjaan Kabel Feeder

Pengadaan dan pemasangan Kabel Feeder, lengkap terpasang dengan alat


bantu dan accessories yang diperlukan sesuai gambar perencanaan dan
spesifikasi teknis.

B.1 Dari P. Utama ke :

a Panel Kontrol Genset NYFGBY 4 x 25 mm² m 75 300,000 22,500,000


b P.1A (Sisi Emergency) NYY 4 x 10 mm² + BC 6 mm² m 10 125,000 1,250,000
c P.1B (Sisi Emergency) NYY 4 x 10 mm² + BC 6 mm² m 86 125,000 10,750,000
d P-1A,(Sisi Normal) NYY 4 x 35 mm² + BC 25 mm² m 10 400,000 4,000,000
e P-1B,(Sisi Normal) NYY 4 x 35 mm² + BC 25 mm² m 86 400,000 34,400,000
f P - DW NYY 4 x 10 mm² + BC 6 mm² m 80 125,000 10,000,000
g PP - AB NYY 4 x 10 mm² + BC 10 mm² m 120 125,000 15,000,000
h PP- STP NYY 4 x 10 mm² + BC 10 mm² m 30 125,000 3,750,000

Sub Total - B.1 101,650,000

B.2 Lain-lain

a Kabel Distribusi dari PLN ke KWH meter PLN


NYFGBY 4 x 120 mm² m 120 1,300,000 156,000,000
b Dari Kwh Meter PLN ke P.UTAMA
NYY 4 x 120 mm² + BC 70 mm² m 12 1,100,000 13,200,000
c Dari P-1A ke P-2A, P-3A ( Sisi Emergency ) NYY 4x4 mm²+ BC 4 mm² m 20 60,000 1,200,000
d Dari P-1B ke P-2B, P-3B ( Sisi Emergency ) NYY 4x4 mm²+ BC 4 mm² m 20 60,000 1,200,000
e Dari P.1A, P.1B ( Sisi Emergency ) Ke Panel Pompa Booster
NYY 4x6 mm²+ BC 6 mm² m 16 80,000 1,280,000
f Dari P-1A ke P-2A, P-3A ( Sisi Normal ) NYY 4x16 mm²+ BC 16 mm² m 20 200,000 4,000,000
g Dari P-1B ke P-2B, P-3B ( Sisi Normal ) NYY 4x16 mm²+ BC 16 mm² m 20 200,000 4,000,000
h Dari P-1A,P-1B,P-2A,P-2B,P-3A,P-3B ke Kwh meter:
NYY 3 x 6 mm² + BC 6 mm² m 936 64,000 59,904,000

Sub Total - B.2 240,784,000

Sub Total - B 342,434,000

RAB-MEP (EL) 12
BILL OF QUANTITY
PROYEK : PEMBANGUNAN GEDUNG DENSUS
LOKASI : RENCANA ANGGARAN BIAYA PEKERJAAN MEKANIKAL & ELEKTRIKAL
PEKERJAAN : PLUMBING, VAC, PEMADAM KEBAKARAN, ELEKTRIKAL, ELEKTRONIK.

HARGA SATUAN TOTAL HARGA


NO. URAIAN PEKERJAAN SAT. VOL.
( Rp. ) ( Rp. )

C. Pekerjaan Instalasi Penerangan dan Stop Kontak

C.1. Lantai 1

Instalasi Penerangan dan Stop Kontak

Pengadaan dan pemasangan instalasi Penerangan dan Stop Kontak,


lengkap terpasang dengan alat bantu dan accessories yang diperlukan
sesuai gambar perencanaan dan spesifikasi teknis.

1. Unit Hunian

a Down Light Lampu LED Bulb 1 x 13 W bh 6 250,000 1,500,000


b Stop Kontak 1φ, 10 A, 200 W bh 6 60,000 360,000
c Saklar Tunggal bh 6 40,000 240,000
d Instalasi Penerangan NYM 3 x 2,5 mm² (PVC Cond Ø 20) ttk 6 200,000 1,200,000
e Instalasi Stop Kontak NYM 3 x 2,5 mm² (PVC Cond Ø 20) ttk 6 400,000 2,400,000
f Inst exhaust Fan (Toilet) NYM 3 x 2,5 mm² (PVC Cond Ø 20) ttk 1 250,000 250,000
g Inst Listrik AC NYM 3 x 4 mm² (PVC Cond Ø 20) ttk 2 430,000 860,000

Sub Total 1 Unit 6,810,000

Total Unit Hunian ( 22 Unit ) 149,820,000

2 Public Area/Corridor

a Panel Lantai ( P1.A, P1.B ) bh 1 10,000,000 10,000,000


b Down Light Lampu LED Bulb 1 x 13 W bh 34 250,000 8,500,000
c Stop Kontak 1φ, 10 A, 200 W bh 4 60,000 240,000
d Saklar Tunggal bh 6 40,000 240,000
e Instalasi Penerangan NYM 3 x 2,5 mm² (PVC Cond Ø 20) ttk 39 200,000 7,800,000
f Instalasi Stop Kontak NYM 3 x 2,5 mm² (PVC Cond Ø 20) ttk 4 400,000 1,600,000
g Inst exhaust Fan NYM 3 x 2,5 mm² (PVC Cond Ø 20) ttk 1 250,000 250,000
h Lampu Tangga TL 1 x 36 W c/w Battery bh 2 1,500,000 3,000,000
i Cable cage ukuran lebar 30 Cm meter 95 200,000 19,000,000
k. Lampu Exit FL 2 x 10 W c/w Battery bh 3 1,500,000 4,500,000

Sub Total Corridor 55,130,000

Total Lantai C.1 ( Lantai 1 ) 204,950,000

C.2. Lantai 2

Instalasi Penerangan dan Stop Kontak

Pengadaan dan pemasangan instalasi Penerangan dan Stop Kontak,


lengkap terpasang dengan alat bantu dan accessories yang diperlukan
sesuai gambar perencanaan dan spesifikasi teknis.

1. Unit Hunian

a Down Light Lampu LED Bulb 1 x 13 W bh 6 250,000 1,500,000


b Stop Kontak 1φ, 10 A, 200 W bh 6 60,000 360,000
c Saklar Tunggal bh 6 40,000 240,000
d Instalasi Penerangan NYM 3 x 2,5 mm² (PVC Cond Ø 20) ttk 6 200,000 1,200,000
e Instalasi Stop Kontak NYM 3 x 2,5 mm² (PVC Cond Ø 20) ttk 6 400,000 2,400,000
f Inst exhaust Fan (Toilet) NYM 3 x 2,5 mm² (PVC Cond Ø 20) ttk 1 250,000 250,000
g Inst Listrik AC NYM 3 x 4 mm² (PVC Cond Ø 20) ttk 2 430,000 860,000

Sub Total 1 Unit 6,810,000

Total Unit Hunian ( 22 Unit ) 149,820,000

RAB-MEP (EL) 13
BILL OF QUANTITY
PROYEK : PEMBANGUNAN GEDUNG DENSUS
LOKASI : RENCANA ANGGARAN BIAYA PEKERJAAN MEKANIKAL & ELEKTRIKAL
PEKERJAAN : PLUMBING, VAC, PEMADAM KEBAKARAN, ELEKTRIKAL, ELEKTRONIK.

HARGA SATUAN TOTAL HARGA


NO. URAIAN PEKERJAAN SAT. VOL.
( Rp. ) ( Rp. )

2 Public Area/Corridor

a Panel Lantai ( P1.A, P1.B ) bh 1 10,000,000 10,000,000


b Down Light Lampu LED Bulb 1 x 13 W bh 34 250,000 8,500,000
c Stop Kontak 1φ, 10 A, 200 W bh 4 60,000 240,000
d Saklar Tunggal bh 6 40,000 240,000
e Instalasi Penerangan NYM 3 x 2,5 mm² (PVC Cond Ø 20) ttk 39 200,000 7,800,000
f Instalasi Stop Kontak NYM 3 x 2,5 mm² (PVC Cond Ø 20) ttk 4 400,000 1,600,000
g Inst exhaust Fan NYM 3 x 2,5 mm² (PVC Cond Ø 20) ttk 1 250,000 250,000
h Lampu Tangga TL 1 x 36 W c/w Battery bh 2 1,500,000 3,000,000
i Cable cage ukuran lebar 30 Cm meter 95 200,000 19,000,000
k. Lampu Exit FL 2 x 10 W c/w Battery bh 3 1,500,000 4,500,000

Sub Total Corridor 55,130,000

Total Lantai C.2 ( Lantai 2 ) 204,950,000

C.3. Lantai 3

Instalasi Penerangan dan Stop Kontak

Pengadaan dan pemasangan instalasi Penerangan dan Stop Kontak,


lengkap terpasang dengan alat bantu dan accessories yang diperlukan
sesuai gambar perencanaan dan spesifikasi teknis.

1. Unit Hunian

a Down Light Lampu LED Bulb 1 x 13 W bh 6 250,000 1,500,000


b Stop Kontak 1φ, 10 A, 200 W bh 6 60,000 360,000
c Saklar Tunggal bh 6 40,000 240,000
d Instalasi Penerangan NYM 3 x 2,5 mm² (PVC Cond Ø 20) ttk 6 200,000 1,200,000
e Instalasi Stop Kontak NYM 3 x 2,5 mm² (PVC Cond Ø 20) ttk 6 400,000 2,400,000
f Inst exhaust Fan (Toilet) NYM 3 x 2,5 mm² (PVC Cond Ø 20) ttk 1 250,000 250,000
g Inst Listrik AC NYM 3 x 4 mm² (PVC Cond Ø 20) ttk 2 430,000 860,000

Sub Total 1 Unit 6,810,000

Total Unit Hunian ( 22 Unit ) 149,820,000

2 Public Area/Corridor

a Panel Lantai ( P1.A, P1.B ) bh 1 10,000,000 10,000,000


b Down Light Lampu LED Bulb 1 x 13 W bh 34 250,000 8,500,000
c Stop Kontak 1φ, 10 A, 200 W bh 4 60,000 240,000
d Saklar Tunggal bh 6 40,000 240,000
e Instalasi Penerangan NYM 3 x 2,5 mm² (PVC Cond Ø 20) ttk 39 200,000 7,800,000
f Instalasi Stop Kontak NYM 3 x 2,5 mm² (PVC Cond Ø 20) ttk 4 400,000 1,600,000
g Inst exhaust Fan NYM 3 x 2,5 mm² (PVC Cond Ø 20) ttk 1 250,000 250,000
h Lampu Tangga TL 1 x 36 W c/w Battery bh 2 1,500,000 3,000,000
i Cable cage ukuran lebar 30 Cm meter 95 200,000 19,000,000
k. Lampu Exit FL 2 x 10 W c/w Battery bh 3 1,500,000 4,500,000

Sub Total Corridor 55,130,000

Total Lantai C.3 ( Lantai 3 ) 204,950,000

Sub Total - C (C.1 s/d C.3) 614,850,000

RAB-MEP (EL) 14
BILL OF QUANTITY
PROYEK : PEMBANGUNAN GEDUNG DENSUS
LOKASI : RENCANA ANGGARAN BIAYA PEKERJAAN MEKANIKAL & ELEKTRIKAL
PEKERJAAN : PLUMBING, VAC, PEMADAM KEBAKARAN, ELEKTRIKAL, ELEKTRONIK.

HARGA SATUAN TOTAL HARGA


NO. URAIAN PEKERJAAN SAT. VOL.
( Rp. ) ( Rp. )

D. Pekerjaan Penangkal Petir

Pengadaan dan pemasangan Instalasi Penangkal Petir, lengkap terpasang


dengan alat bantu dan accessories yang diperlukan sesuai gambar
perencanaan dan spesifikasi teknis.

1 Air Terminal Penangkal Petir type Elektrostatis radius perlindungan 100 m unit 1 36,000,000 36,000,000
dan pipa Galvani Tinggi 5 meter
2 Kabek Coaxial 2 x 35 Sqmm m 25 600,000 15,000,000
3 Grounding System terdiri dari : lot 1 5,000,000 5,000,000
- Earth Copper Rod Ø 1" (dlm PVC Ø 2")
- BC 70 mm²
- Copper Plate + Sepatu Kabel
- Material Bantu
7 Bak Kontrol 400 x 400 unit 1 2,000,000 2,000,000
Sub Total - D 58,000,000

E. Pekerjaan Site Plan

1 Armature lampu Taman Glass Bulat LED 1 x 10 W lengkap tiang tinggi 2,5 m bh 10 800,000 8,000,000
2 Instalasi Penerangan Taman NYY 3 x 2,5 mm² (PVC Cond Ø 20) ttk 10 400,000 4,000,000
3 Instalasi Listrik Ruang Pompa
- Armature Baret Persegi LED Bulb 9 W bh 1 420,000 420,000
- Armature lampu LED 1 x 22 W Type Balk bh 6 450,000 2,700,000
- Saklar Tunggal bh 3 40,000 120,000
- Stop Kontak 1φ, 10 A, 200 W bh 1 55,000 55,000
- Instalasi Stop Kontak NYM 3 x 2,5 mm² (PVC Cond Ø 20) ttk 1 305,000 305,000
- Instalasi Penerangan NYM 3 x 2,5 mm² (PVC Cond Ø 20) ttk 7 255,000 1,785,000

Sub Total - E 17,385,000

TOTAL PEKERJAAN ELEKTRIKAL (A s/d E) 1,345,669,000

RAB-MEP (EL) 15
BILL OF QUANTITY
PROYEK : PEMBANGUNAN GEDUNG DENSUS
LOKASI : RENCANA ANGGARAN BIAYA PEKERJAAN MEKANIKAL & ELEKTRIKAL
PEKERJAAN : PLUMBING, VAC, PEMADAM KEBAKARAN, ELEKTRIKAL, ELEKTRONIK.

HARGA SATUAN TOTAL HARGA


NO. URAIAN PEKERJAAN SAT. VOL.
( Rp. ) ( Rp. )

D.V. PEKERJAAN GENST

A. Peralatan Utama

Pengadaan dan pemasangan Peralatan Utama Genset, lengkap terpasang


dengan alat bantu dan accessories lain yang diperlukan sesuai dengan
gambar perencanaan dan spesifikasi teknis.

1 Diesel Generator Set Kapasitas 30 kVA, 380/220 V / 50 Hz / 1500 RPM, Unit 1 200,000,000 200,000,000
Standby Rating. c/w Residential Silencer, Spring Vibration (Type Package).
3 Tangki harian bahan bakar kapasitas 100 liter Unit 1 2,000,000 2,000,000
4 Tangki mingguanbahan bakar kapasitas 1000 liter Unit 1 4,000,000 4,000,000
5 Pompa Electric Unit 1 7,200,000 7,200,000
6 Pompa Manual Unit 1 4,000,000 4,000,000
7 Panel Pompa electric termasuk wiring & sistem Control Unit 1 10,000,000 10,000,000

Sub Total - A 227,200,000

B. Peralatan Instalasi Genset

Pengadaan dan pemasangan instalasi Genset, lengkap terpasang dengan


alat bantu dan accessories lain yang diperlukan sesuai dengan gambar
perencanaan dan spesifikasi teknis.

1 Instalasi Pemipaan bahan bakar lengkap dengan Gate Valve, Check Valve, lot 1 10,000,000 10,000,000
Float Vave dan accessories
2 Tool Kit Set 1 2,400,000 2,400,000
3 Pengadaan Solar 1.000 lt pada saat serah terima lot 1 10,000,000 10,000,000
4 Exhaust Fan + grill termasuk power listrik Unit 1 6,000,000 6,000,000
5 Perijinan Depnaker lot 1 3,000,000 3,000,000

Sub Total - B 31,400,000

TOTAL PEKERJAAN GENSET 258,600,000

RAB-MEP (EL) 16
BILL OF QUANTITY
PROYEK : PEMBANGUNAN GEDUNG DENSUS
LOKASI : RENCANA ANGGARAN BIAYA PEKERJAAN MEKANIKAL & ELEKTRIKAL
PEKERJAAN : PLUMBING, VAC, PEMADAM KEBAKARAN, ELEKTRIKAL, ELEKTRONIK.

HARGA SATUAN TOTAL HARGA


NO. URAIAN PEKERJAAN SAT. VOL.
( Rp. ) ( Rp. )

D.VI. PEKERJAAN ELEKTRONIK

D.VI.1. PEKERJAAN FIRE ALARM

A. Peralatan Utama

Pengadaan dan pemasangan Peralatan Utama Elektronik, lengkap terpasang


dengan alat bantu dan accessories yang diperlukan sesuai gambar
perencanaan dan spesifikasi teknis.

1 MCP-FA 10 Zone (Semi Addressable) unit 1 30,000,000 30,000,000


2 MDF-FA 1 Loop unit 1 6,400,000 6,400,000
3 Battery Sealed Acid Rechargeable 4 jam unit 1 17,600,000 17,600,000
4 Grounding Sistem Max 1 Ohm + Surge Arester unit 1 3,200,000 3,200,000
5 Rectifier unit 1 2,000,000 2,000,000

Sub Total - A 59,200,000

B. Pengkabelan

Pengadaan dan pemasangan Kabel Feeder, lengkap terpasang dengan alat


bantu dan accessories yang diperlukan sesuai gambar perencanaan dan
spesifikasi teknis.

B.1 Penarikan Kabel Feeder dari MCP-FA ke :

a MDF - FA 2 pair Twisted Shielded, AWG 18 FRC (Data dan Voice)/loop m 40 51,000 2,040,000
b MDF - FA FRC 2 x 2,5 mm² m 8 44,000 352,000
c MDF - FA FRC 2 x 2,5 mm², 24 VDC (PVC Cond Ø 20) m 8 44,000 352,000
d MDF - FA ITC 2 x 0,6 mm² (PVC Cond Ø 20) m 8 11,000 88,000
e MDF - FA RS-485/AWG 18 FRC (sesuai Standard m 8 68,000 544,000
Pabrik (PVC Cond Ø 20)

B.2 Penarikan Kabel Feeder dari MDF-FA ke :

2 TBFA - 1.
- 2 pair Twisted Shielded, AWG 18 FRC (Data dan Voice) m 5 51,000 255,000
- FRC 3 x 2,5 mm² m 5 44,000 220,000
- FRC 3 x 2,5 mm², 24 VDC (PVC Cond Ø 20) m 5 44,000 220,000
- ITC 2 x 0,6 mm² (PVC Cond Ø 20) m 5 11,000 55,000

4 TBFA - 2
- 2 pair Twisted Shielded, AWG 18 FRC (Data dan Voice) m 6 51,000 306,000
- FRC 3 x 2,5 mm² m 6 44,000 264,000
- FRC 3 x 2,5 mm², 24 VDC (PVC Cond Ø 20) m 6 44,000 264,000
- ITC 2 x 0,6 mm² (PVC Cond Ø 20) m 6 11,000 66,000

5 TBFA - 3
- 2 pair Twisted Shielded, AWG 18 FRC (Data dan Voice) m 6 51,000 306,000
- FRC 3 x 2,5 mm² m 6 44,000 264,000
- FRC 3 x 2,5 mm², 24 VDC (PVC Cond Ø 20) m 6 44,000 264,000
- ITC 2 x 0,6 mm² (PVC Cond Ø 20) m 6 11,000 66,000

Sub Total - B 5,926,000

RAB-MEP (ELC) 17
BILL OF QUANTITY
PROYEK : PEMBANGUNAN GEDUNG DENSUS
LOKASI : RENCANA ANGGARAN BIAYA PEKERJAAN MEKANIKAL & ELEKTRIKAL
PEKERJAAN : PLUMBING, VAC, PEMADAM KEBAKARAN, ELEKTRIKAL, ELEKTRONIK.

HARGA SATUAN TOTAL HARGA


NO. URAIAN PEKERJAAN SAT. VOL.
( Rp. ) ( Rp. )

C. Pekerjaan Instalasi Fire Alarm

Pengadaan dan pemasangan Instalasi Fire Alarm, lengkap terpasang dengan


alat bantu dan accessories yang diperlukan sesuai gambar perencanaan dan
spesifikasi teknis.

C.1 Lantai 1
1 Smoke Detector (Photo Electric) bh 34 570,000 19,380,000
2 Manual Alarm Push Button bh 2 247,500 495,000
3 Alarm Bell bh 2 440,000 880,000
4 alarm Indicator Lamp bh 2 590,000 1,180,000
5 Fire Intercom Jack bh 2 320,000 640,000
6 end Of Line bh 3 44,000 132,000
7 Terminal Box Fire Alarm c/w Module unit 1 6,500,000 6,500,000
8 Inst. Fire Alarm NYA 2 x 1,5 mm² (PVC Cond Ø 20) ttk 38 275,000 10,450,000
9 Inst. Manual Push Button FRC 2 x 1,5 mm² (PVC Cond H.I Ø 20) ttk 2 195,000 390,000
10 Inst. Alarm Bell FRC 2 x 1,5 mm² (PVC Cond H.I Ø 20) ttk 2 195,000 390,000
11 Inst. Alarm Lamp FRC 2 x 1,5 mm² (PVC Cond H.I Ø 20) ttk 2 195,000 390,000
12 Inst. Fire Intercom Jack ITC 2 x 2 x 0,6 mm² (PVC Cond H.I Ø 20) ttk 2 550,000 1,100,000
(PVC Cond Ø 20)
Sub Total - C.1 41,927,000

C.2 Lantai 2

1 Smoke Detector (Photo Electric) bh 34 570,000 19,380,000


2 Manual Alarm Push Button bh 2 247,500 495,000
3 Alarm Bell bh 2 440,000 880,000
4 alarm Indicator Lamp bh 2 590,000 1,180,000
5 Fire Intercom Jack bh 2 320,000 640,000
6 end Of Line bh 3 44,000 132,000
7 Terminal Box Fire Alarm c/w Module unit 1 6,500,000 6,500,000
8 Inst. Fire Alarm NYA 2 x 1,5 mm² (PVC Cond Ø 20) ttk 38 275,000 10,450,000
9 Inst. Manual Push Button FRC 2 x 1,5 mm² (PVC Cond H.I Ø 20) ttk 2 195,000 390,000
10 Inst. Alarm Bell FRC 2 x 1,5 mm² (PVC Cond H.I Ø 20) ttk 2 195,000 390,000
11 Inst. Alarm Lamp FRC 2 x 1,5 mm² (PVC Cond H.I Ø 20) ttk 2 195,000 390,000
12 Inst. Fire Intercom Jack ITC 2 x 2 x 0,6 mm² (PVC Cond H.I Ø 20) ttk 2 550,000 1,100,000
(PVC Cond Ø 20) -
Sub Total - C.2 41,927,000

C.3 Lantai 3

1 Smoke Detector (Photo Electric) bh 34 570,000 19,380,000


2 Manual Alarm Push Button bh 2 247,500 495,000
3 Alarm Bell bh 2 440,000 880,000
4 alarm Indicator Lamp bh 2 590,000 1,180,000
5 Fire Intercom Jack bh 2 320,000 640,000
6 end Of Line bh 3 44,000 132,000
7 Terminal Box Fire Alarm c/w Module unit 1 6,500,000 6,500,000
8 Inst. Fire Alarm NYA 2 x 1,5 mm² (PVC Cond Ø 20) ttk 38 275,000 10,450,000
9 Inst. Manual Push Button FRC 2 x 1,5 mm² (PVC Cond H.I Ø 20) ttk 2 195,000 390,000
10 Inst. Alarm Bell FRC 2 x 1,5 mm² (PVC Cond H.I Ø 20) ttk 2 195,000 390,000
11 Inst. Alarm Lamp FRC 2 x 1,5 mm² (PVC Cond H.I Ø 20) ttk 2 195,000 390,000
12 Inst. Fire Intercom Jack ITC 2 x 2 x 0,6 mm² (PVC Cond H.I Ø 20) ttk 2 550,000 1,100,000
(PVC Cond Ø 20)

Sub Total - C.3 41,927,000

Sub Total - C (C.1 s/d C.3) 125,781,000

TOTAL PEKERJAAN FIRE ALARM 190,907,000

RAB-MEP (ELC) 18
BILL OF QUANTITY
PROYEK : PEMBANGUNAN GEDUNG DENSUS
LOKASI : RENCANA ANGGARAN BIAYA PEKERJAAN MEKANIKAL & ELEKTRIKAL
PEKERJAAN : PLUMBING, VAC, PEMADAM KEBAKARAN, ELEKTRIKAL, ELEKTRONIK.

HARGA SATUAN TOTAL HARGA


NO. URAIAN PEKERJAAN SAT. VOL.
( Rp. ) ( Rp. )

VI.2. PEKERJAAN MATV

A. Peralatan Utama MATV

Pengadaan dan pemasangan Peralatan Utama MATV, lengkap terpasang


dengan alat bantu dan accessories lain yang diperlukan sesuai dengan
gambar perencanaan dan spesifikasi Teknis.

1 VHF Antena unit 1 750,000 750,000


2 UHF Antena unit 2 1,400,000 2,800,000
3 Asiasat 35 - 12 FT (Parabola) unit 1 16,000,000 16,000,000
4 Indovision - 30 Cm unit 1 by Indovision
5 CSA (Coaxial Surge Arester) unit 5 320,000 1,600,000
6 Cakrawarta - Parabola unit 1 3,960,000 3,960,000
7 Splitter unit 5 240,000 1,200,000
Decoder Indovision unit 14 by Indovision
Receiver Parabola unit 5 1,800,000 9,000,000
Modulator unit 22 2,000,000 44,000,000
Channel Amplifier unit 22 2,000,000 44,000,000
Booster MATV unit 6 6,000,000 36,000,000
8 Active Combiner (Ground max 10 mm) unit 1 5,500,000 5,500,000
9 Attenuator unit 1 600,000 600,000
10 TV Monitor 21" set 1 3,000,000 3,000,000
11 PSA (Power Surge Arester Ground max 10 mm) unit 1 2,400,000 2,400,000

Sub Total - A 170,810,000

B. Kabel Distribusi MATV

Pengadaan dan pemasangan Kabel Distribusi MATV, lengkap terpasang


dengan alat bantu dan accessories lain yang diperlukan sesuai dengan
gambar perencanaan dan spesifikasi Teknis.

1 Penarikan kabel dari Peralatan Utama ke :


a Antena VHF, Coaxial Cable 7C-2V-75 Ohm (dlm PVC Cond HI Ø 20) m 30 40,000 1,200,000
b Antena UHF, Coaxial Cable 7C-2V-75 Ohm (dlm PVC Cond HI Ø 20) m 30 40,000 1,200,000
c Antena UHF, Coaxial Cable 7C-2V-75 Ohm (dlm PVC Cond HI Ø 20) m 30 40,000 1,200,000
d Asiasat Parabola, Coaxial Cable 7C-2V-75 Ohm (dlm PVC Cond HI Ø 20) m 30 40,000 1,200,000
e Cakrawala Parabola, Coaxial Cable 7C-2V-75 Ohm (dlm PVC Cond HI Ø 20) m 30 40,000 1,200,000
2 Penarikan kabel dari Active Combiner ke :
a Spliter Lt. Atap Coaxial Cable 7C-2V-75 Ohm (dlm PVC Cond HI Ø 20) m 30 40,000 1,200,000

Sub Total - B 7,200,000

C. Pekerjaan Instalasi MATV

Pengadaan dan pemasangan Instalasi MATV , lengkap terpasang dengan alat


bantu dan accessories lain yang diperlukan sesuai dengan gambar
perencanaan dan spesifikasi Teknis.

C.1 Lantai 1

1 Outlet MATV bh 22 70,000 1,540,000


2 Splitter bh 3 275,000 825,000
3 Coupler 4 way bh 10 275,000 2,750,000
4 Instalasi MATV, Coaxial Cable 5C-2V-75 Ohm (dlm PVC Cond HI Ø 20) ttk 22 800,000 17,600,000

C.2 Lantai 2

1 Outlet MATV bh 22 70,000 1,540,000


2 Splitter bh 3 275,000 825,000
3 Coupler 4 way bh 10 275,000 2,750,000
4 Instalasi MATV, Coaxial Cable 5C-2V-75 Ohm (dlm PVC Cond HI Ø 20) ttk 22 800,000 17,600,000

RAB-MEP (ELC) 19
BILL OF QUANTITY
PROYEK : PEMBANGUNAN GEDUNG DENSUS
LOKASI : RENCANA ANGGARAN BIAYA PEKERJAAN MEKANIKAL & ELEKTRIKAL
PEKERJAAN : PLUMBING, VAC, PEMADAM KEBAKARAN, ELEKTRIKAL, ELEKTRONIK.

HARGA SATUAN TOTAL HARGA


NO. URAIAN PEKERJAAN SAT. VOL.
( Rp. ) ( Rp. )

C.3 Lantai 3

1 Outlet MATV bh 22 70,000 1,540,000


2 Splitter bh 3 275,000 825,000
3 Coupler 4 way bh 10 275,000 2,750,000
4 Instalasi MATV, Coaxial Cable 5C-2V-75 Ohm (dlm PVC Cond HI Ø 20) ttk 22 800,000 17,600,000

Sub Total - C 68,145,000

TOTAL PEKERJAAN MATV ( A s/d C) 246,155,000

TOTAL PEKERJAAN ELECTRONIC ( FIRE ALARM DAN MATV ) 437,062,000.00

D PEKERJAAN TATA SUARA


Power Amplifier Unit 1 2,575,000.00 2,575,000.00
Equalizer Unit 1 2,250,000.00 2,250,000.00
Mixer Pree Amp Unit 1 2,250,000.00 2,250,000.00
CD/MP3 Unit 1 553,340.00 553,340.00
Radio Tunner Unit 1 698,540.00 698,540.00
Emergency Microphone Unit 1 1,750,000.00 1,750,000.00
Pagging Microphone Unit 1 1,750,000.00 1,750,000.00
System Car Call -
- Power Amplifier Unit 1 2,200,000.00 2,200,000.00
- Pagging Microphone Unit 1 1,750,000.00 1,750,000.00
Main Distribution Frame (MDF) Unit 1 550,000.00 550,000.00
Lantai Satu
- TB-TS Lt. Satu bh 1 450,000.00 450,000.00
- Kabel dari MDF ke TB-TS Gd. Rusun, NYMHY 4 x (3 x 1,5 mm2) m' 25 63,490.00 1,587,250.00
- Kabel dari MDF ke TB-TS Lt. Satu, NYMHY 4 x (3 x 1,5 mm2) m' 10 63,490.00 634,900.00
- Ceiling Speaker 3 W bh 6 173,740.00 1,042,440.00
- Volume Control bh 1 181,610.00 181,610.00
- Titik Instalasi Speaker, NYMHY 3 x 1,5 mm2 dalam Konduit PVC ttk 7 354,740.00 2,483,180.00
Lantai Dua
- TB-TS Lt. Satu bh 1 450,000.00 450,000.00
- Kabel dari MDF ke TB-TS Lt. Dua, NYMHY 4 x (3 x 1,5 mm2) m' 10 63,490.00 634,900.00
- Ceiling Speaker 3 W bh 6 173,740.00 1,042,440.00
- Volume Control bh 1 181,610.00 181,610.00
- Titik Instalasi Speaker, NYMHY 3 x 1,5 mm2 dalam Konduit PVC ttk 7 354,740.00 2,483,180.00
Lantai Tiga
- TB-TS Lt. Satu bh 1 450,000.00 450,000.00
- Kabel dari MDF ke TB-TS Lt. Tiga, NYMHY 4 x (3 x 1,5 mm2) m' 10 63,490.00 634,900.00
- Ceiling Speaker 3 W bh 6 173,740.00 1,042,440.00
- Volume Control bh 1 181,610.00 181,610.00
- Titik Instalasi Speaker, NYMHY 3 x 1,5 mm2 dalam Konduit PVC ttk 7 354,740.00 2,483,180.00

Sub Total - C 32,290,520.00


TOTAL PEKERJAAN TATA SUARA 32,290,520.00

RAB-MEP (ELC) 20