TOTAL HARGA
NO. URAIAN PEKERJAAN
( Rp. )
TOTAL 4,115,160,520
RAB-MEP (AC) 1
BILL OF QUANTITY
PROYEK : PEMBANGUNAN GEDUNG DENSUS
LOKASI : RENCANA ANGGARAN BIAYA PEKERJAAN MEKANIKAL & ELEKTRIKAL
PEKERJAAN : PLUMBING, VAC, PEMADAM KEBAKARAN, ELEKTRIKAL, ELEKTRONIK.
1 Lantai 1
Sub Total - 1 -
2 Lantai 2
Sub Total - 2 -
3 Lantai 3
Sub Total - 3 -
1 Lantai 1
RAB-MEP (AC) 2
BILL OF QUANTITY
PROYEK : PEMBANGUNAN GEDUNG DENSUS
LOKASI : RENCANA ANGGARAN BIAYA PEKERJAAN MEKANIKAL & ELEKTRIKAL
PEKERJAAN : PLUMBING, VAC, PEMADAM KEBAKARAN, ELEKTRIKAL, ELEKTRONIK.
2 Lantai 2
3 Lantai 3.
B.1 Lantai 1
1 Pemipaan AC Split
RAB-MEP (AC) 3
BILL OF QUANTITY
PROYEK : PEMBANGUNAN GEDUNG DENSUS
LOKASI : RENCANA ANGGARAN BIAYA PEKERJAAN MEKANIKAL & ELEKTRIKAL
PEKERJAAN : PLUMBING, VAC, PEMADAM KEBAKARAN, ELEKTRIKAL, ELEKTRONIK.
B.2. Lantai 2
1 Pemipaan AC Split
B.3. Lantai 3.
1 Pemipaan AC Split
RAB-MEP (AC) 4
BILL OF QUANTITY
PROYEK : PEMBANGUNAN GEDUNG DENSUS
LOKASI : RENCANA ANGGARAN BIAYA PEKERJAAN MEKANIKAL & ELEKTRIKAL
PEKERJAAN : PLUMBING, VAC, PEMADAM KEBAKARAN, ELEKTRIKAL, ELEKTRONIK.
Pengadaan dan pemasangan Peralatan Utama Air Bersih, lengkap terpasang dengan
alat bantu dan accessories yang diperlukan sesuai gambar perencanaan dan
spesifikasi teknis.
2 Pompa Deep Well (DW - 0A) c/w pembuatan sumur, instalasi set 1 240,000,000 240,000,000
Kapasitas : 12 M³/H
Total Head : 80 M
Daya Listrik : 7.5 KW
Data Listrik : 380 V/3 Ph/50 Hz
Type : Vertical Submersible
Operasi : Star/Stop Otomatis - Continus Operation
Lokasi : Site Plan
RAB-MEP (PL) 5
BILL OF QUANTITY
PROYEK : PEMBANGUNAN GEDUNG DENSUS
LOKASI : RENCANA ANGGARAN BIAYA PEKERJAAN MEKANIKAL & ELEKTRIKAL
PEKERJAAN : PLUMBING, VAC, PEMADAM KEBAKARAN, ELEKTRIKAL, ELEKTRONIK.
Pengadaan dan pemasangan Peralatan Utama Air Bekas, Kotor dan Vent bahan pipa
PVC class AW, lengkap terpasang dengan alat bantu dan accessories yang
diperlukan sesuai gambar perencanaan dan spesifikasi teknis.
1 Sewage Treatment Plant (STP) - Extended Aeration System. set 1 250,000,000 250,000,000
Kapasitas : 34 m³/hari
Type : Tabung
Pengadaan dan pemasangan Pipa Air Bersih bahan pipa PPR PN 10, lengkap
terpasang dengan alat bantu dan accessories yang diperlukan sesuai gambar
perencanaan dan spesifikasi teknis.
b Valve-Valve
Pengadaan dan pemasangan Valve-valve, lengkap terpasang dengan alat bantu dan
accessories yang diperlukan sesuai gambar perencanaan dan spesifikasi teknis.
Pengadaan dan pemasangan pipa Air Bekas, Kotor dan Vent bahan pipa PVC class
AW, lengkap terpasang dengan alat bantu dan accessories yang diperlukan sesuai
gambar perencanaan dan spesifikasi teknis.
Pengadaan dan pemasangan Floor Drain, Bak Kontrol, GV, lengkap terpasang
dengan alat bantu dan accessories yang diperlukan sesuai gambar perencanaan dan
spesifikasi teknis.
RAB-MEP (PL) 6
BILL OF QUANTITY
PROYEK : PEMBANGUNAN GEDUNG DENSUS
LOKASI : RENCANA ANGGARAN BIAYA PEKERJAAN MEKANIKAL & ELEKTRIKAL
PEKERJAAN : PLUMBING, VAC, PEMADAM KEBAKARAN, ELEKTRIKAL, ELEKTRONIK.
B.2 Lantai 1
Unit Hunian
Pengadaan dan pemasangan Pipa Air Bersih bahan pipa PPR PN 10, lengkap
terpasang dengan alat bantu dan accessories yang diperlukan sesuai gambar
perencanaan dan spesifikasi teknis.
b Valve-Valve
Pengadaan dan pemasangan Valve-valve, lengkap terpasang dengan alat bantu dan
accessories yang diperlukan sesuai gambar perencanaan dan spesifikasi teknis.
Pengadaan dan pemasangan pipa Air Bekas, Kotor dan Vent bahan pipa PVC class
AW, lengkap terpasang dengan alat bantu dan accessories yang diperlukan sesuai
gambar perencanaan dan spesifikasi teknis.
b FD, CO
Pengadaan dan pemasangan VD, CO, lengkap terpasang dengan alat bantu dan
accessories yang diperlukan sesuai gambar perencanaan dan spesifikasi teknis.
RAB-MEP (PL) 7
BILL OF QUANTITY
PROYEK : PEMBANGUNAN GEDUNG DENSUS
LOKASI : RENCANA ANGGARAN BIAYA PEKERJAAN MEKANIKAL & ELEKTRIKAL
PEKERJAAN : PLUMBING, VAC, PEMADAM KEBAKARAN, ELEKTRIKAL, ELEKTRONIK.
B.3 Lantai 2
Unit Hunian
Pengadaan dan pemasangan Pipa Air Bersih bahan pipa PPR PN 10, lengkap
terpasang dengan alat bantu dan accessories yang diperlukan sesuai gambar
perencanaan dan spesifikasi teknis.
b Valve-Valve
Pengadaan dan pemasangan Valve-valve, lengkap terpasang dengan alat bantu dan
accessories yang diperlukan sesuai gambar perencanaan dan spesifikasi teknis.
Pengadaan dan pemasangan pipa Air Bekas, Kotor dan Vent bahan pipa PVC class
AW, lengkap terpasang dengan alat bantu dan accessories yang diperlukan sesuai
gambar perencanaan dan spesifikasi teknis.
b Ffoor Drain
Pengadaan dan pemasangan Floor Drain, lengkap terpasang dengan alat bantu dan
accessories yang diperlukan sesuai gambar perencanaan dan spesifikasi teknis.
RAB-MEP (PL) 8
BILL OF QUANTITY
PROYEK : PEMBANGUNAN GEDUNG DENSUS
LOKASI : RENCANA ANGGARAN BIAYA PEKERJAAN MEKANIKAL & ELEKTRIKAL
PEKERJAAN : PLUMBING, VAC, PEMADAM KEBAKARAN, ELEKTRIKAL, ELEKTRONIK.
B.4 Lantai 3
Unit Hunian
Pengadaan dan pemasangan Pipa Air Bersih bahan pipa PPR PN 10, lengkap
terpasang dengan alat bantu dan accessories yang diperlukan sesuai gambar
perencanaan dan spesifikasi teknis.
b Valve-Valve
Pengadaan dan pemasangan Valve-valve, lengkap terpasang dengan alat bantu dan
accessories yang diperlukan sesuai gambar perencanaan dan spesifikasi teknis.
Pengadaan dan pemasangan pipa Air Bekas, Kotor dan Vent bahan pipa PVC class
AW, lengkap terpasang dengan alat bantu dan accessories yang diperlukan sesuai
gambar perencanaan dan spesifikasi teknis.
b Floor Drain
Pengadaan dan pemasangan Floor Drain, lengkap terpasang dengan alat bantu dan
accessories yang diperlukan sesuai gambar perencanaan dan spesifikasi teknis.
RAB-MEP (PL) 9
BILL OF QUANTITY
PROYEK : PEMBANGUNAN GEDUNG DENSUS
LOKASI : RENCANA ANGGARAN BIAYA PEKERJAAN MEKANIKAL & ELEKTRIKAL
PEKERJAAN : PLUMBING, VAC, PEMADAM KEBAKARAN, ELEKTRIKAL, ELEKTRONIK.
Lantai Atap
Pengadaan dan pemasangan pipa Air Hujan bahan pipa PVC class AW, lengkap
terpasang dengan alat bantu dan accessories yang diperlukan sesuai gambar
perencanaan dan spesifikasi teknis.
- Pipa Air Hujan Ø 100 (Riser s/d Site Plan) m 453 276,000 125,028,000
b Roof Drain
Pengadaan dan pemasangan Roof Drain, lengkap terpasang dengan alat bantu dan
accessories yang diperlukan sesuai gambar perencanaan dan spesifikasi teknis.
RAB-MEP (PL) 10
BILL OF QUANTITY
PROYEK : PEMBANGUNAN GEDUNG DENSUS
LOKASI : RENCANA ANGGARAN BIAYA PEKERJAAN MEKANIKAL & ELEKTRIKAL
PEKERJAAN : PLUMBING, VAC, PEMADAM KEBAKARAN, ELEKTRIKAL, ELEKTRONIK.
1 Lantai 1
- Fire Extinguisher (FE) 3 Kg (Dry Chemical) bh 5 800,000 4,000,000
- Fire Extinguisher (FE) 6,8 Kg (Dry Chemical)/Ruang Pompa bh 1 1,600,000 1,600,000
2 Lantai 2
- Fire Extinguisher (FE) 3 Kg (Dry Chemical) bh 5 800,000 4,000,000
3 Lantai 3
- Fire Extinguisher (FE) 3 Kg (Dry Chemical) bh 5 800,000 4,000,000
RAB-MEP (PK) 11
BILL OF QUANTITY
PROYEK : PEMBANGUNAN GEDUNG DENSUS
LOKASI : RENCANA ANGGARAN BIAYA PEKERJAAN MEKANIKAL & ELEKTRIKAL
PEKERJAAN : PLUMBING, VAC, PEMADAM KEBAKARAN, ELEKTRIKAL, ELEKTRONIK.
A. Peralatan Utama
B.2 Lain-lain
RAB-MEP (EL) 12
BILL OF QUANTITY
PROYEK : PEMBANGUNAN GEDUNG DENSUS
LOKASI : RENCANA ANGGARAN BIAYA PEKERJAAN MEKANIKAL & ELEKTRIKAL
PEKERJAAN : PLUMBING, VAC, PEMADAM KEBAKARAN, ELEKTRIKAL, ELEKTRONIK.
C.1. Lantai 1
1. Unit Hunian
2 Public Area/Corridor
C.2. Lantai 2
1. Unit Hunian
RAB-MEP (EL) 13
BILL OF QUANTITY
PROYEK : PEMBANGUNAN GEDUNG DENSUS
LOKASI : RENCANA ANGGARAN BIAYA PEKERJAAN MEKANIKAL & ELEKTRIKAL
PEKERJAAN : PLUMBING, VAC, PEMADAM KEBAKARAN, ELEKTRIKAL, ELEKTRONIK.
2 Public Area/Corridor
C.3. Lantai 3
1. Unit Hunian
2 Public Area/Corridor
RAB-MEP (EL) 14
BILL OF QUANTITY
PROYEK : PEMBANGUNAN GEDUNG DENSUS
LOKASI : RENCANA ANGGARAN BIAYA PEKERJAAN MEKANIKAL & ELEKTRIKAL
PEKERJAAN : PLUMBING, VAC, PEMADAM KEBAKARAN, ELEKTRIKAL, ELEKTRONIK.
1 Air Terminal Penangkal Petir type Elektrostatis radius perlindungan 100 m unit 1 36,000,000 36,000,000
dan pipa Galvani Tinggi 5 meter
2 Kabek Coaxial 2 x 35 Sqmm m 25 600,000 15,000,000
3 Grounding System terdiri dari : lot 1 5,000,000 5,000,000
- Earth Copper Rod Ø 1" (dlm PVC Ø 2")
- BC 70 mm²
- Copper Plate + Sepatu Kabel
- Material Bantu
7 Bak Kontrol 400 x 400 unit 1 2,000,000 2,000,000
Sub Total - D 58,000,000
1 Armature lampu Taman Glass Bulat LED 1 x 10 W lengkap tiang tinggi 2,5 m bh 10 800,000 8,000,000
2 Instalasi Penerangan Taman NYY 3 x 2,5 mm² (PVC Cond Ø 20) ttk 10 400,000 4,000,000
3 Instalasi Listrik Ruang Pompa
- Armature Baret Persegi LED Bulb 9 W bh 1 420,000 420,000
- Armature lampu LED 1 x 22 W Type Balk bh 6 450,000 2,700,000
- Saklar Tunggal bh 3 40,000 120,000
- Stop Kontak 1φ, 10 A, 200 W bh 1 55,000 55,000
- Instalasi Stop Kontak NYM 3 x 2,5 mm² (PVC Cond Ø 20) ttk 1 305,000 305,000
- Instalasi Penerangan NYM 3 x 2,5 mm² (PVC Cond Ø 20) ttk 7 255,000 1,785,000
RAB-MEP (EL) 15
BILL OF QUANTITY
PROYEK : PEMBANGUNAN GEDUNG DENSUS
LOKASI : RENCANA ANGGARAN BIAYA PEKERJAAN MEKANIKAL & ELEKTRIKAL
PEKERJAAN : PLUMBING, VAC, PEMADAM KEBAKARAN, ELEKTRIKAL, ELEKTRONIK.
A. Peralatan Utama
1 Diesel Generator Set Kapasitas 30 kVA, 380/220 V / 50 Hz / 1500 RPM, Unit 1 200,000,000 200,000,000
Standby Rating. c/w Residential Silencer, Spring Vibration (Type Package).
3 Tangki harian bahan bakar kapasitas 100 liter Unit 1 2,000,000 2,000,000
4 Tangki mingguanbahan bakar kapasitas 1000 liter Unit 1 4,000,000 4,000,000
5 Pompa Electric Unit 1 7,200,000 7,200,000
6 Pompa Manual Unit 1 4,000,000 4,000,000
7 Panel Pompa electric termasuk wiring & sistem Control Unit 1 10,000,000 10,000,000
1 Instalasi Pemipaan bahan bakar lengkap dengan Gate Valve, Check Valve, lot 1 10,000,000 10,000,000
Float Vave dan accessories
2 Tool Kit Set 1 2,400,000 2,400,000
3 Pengadaan Solar 1.000 lt pada saat serah terima lot 1 10,000,000 10,000,000
4 Exhaust Fan + grill termasuk power listrik Unit 1 6,000,000 6,000,000
5 Perijinan Depnaker lot 1 3,000,000 3,000,000
RAB-MEP (EL) 16
BILL OF QUANTITY
PROYEK : PEMBANGUNAN GEDUNG DENSUS
LOKASI : RENCANA ANGGARAN BIAYA PEKERJAAN MEKANIKAL & ELEKTRIKAL
PEKERJAAN : PLUMBING, VAC, PEMADAM KEBAKARAN, ELEKTRIKAL, ELEKTRONIK.
A. Peralatan Utama
B. Pengkabelan
a MDF - FA 2 pair Twisted Shielded, AWG 18 FRC (Data dan Voice)/loop m 40 51,000 2,040,000
b MDF - FA FRC 2 x 2,5 mm² m 8 44,000 352,000
c MDF - FA FRC 2 x 2,5 mm², 24 VDC (PVC Cond Ø 20) m 8 44,000 352,000
d MDF - FA ITC 2 x 0,6 mm² (PVC Cond Ø 20) m 8 11,000 88,000
e MDF - FA RS-485/AWG 18 FRC (sesuai Standard m 8 68,000 544,000
Pabrik (PVC Cond Ø 20)
2 TBFA - 1.
- 2 pair Twisted Shielded, AWG 18 FRC (Data dan Voice) m 5 51,000 255,000
- FRC 3 x 2,5 mm² m 5 44,000 220,000
- FRC 3 x 2,5 mm², 24 VDC (PVC Cond Ø 20) m 5 44,000 220,000
- ITC 2 x 0,6 mm² (PVC Cond Ø 20) m 5 11,000 55,000
4 TBFA - 2
- 2 pair Twisted Shielded, AWG 18 FRC (Data dan Voice) m 6 51,000 306,000
- FRC 3 x 2,5 mm² m 6 44,000 264,000
- FRC 3 x 2,5 mm², 24 VDC (PVC Cond Ø 20) m 6 44,000 264,000
- ITC 2 x 0,6 mm² (PVC Cond Ø 20) m 6 11,000 66,000
5 TBFA - 3
- 2 pair Twisted Shielded, AWG 18 FRC (Data dan Voice) m 6 51,000 306,000
- FRC 3 x 2,5 mm² m 6 44,000 264,000
- FRC 3 x 2,5 mm², 24 VDC (PVC Cond Ø 20) m 6 44,000 264,000
- ITC 2 x 0,6 mm² (PVC Cond Ø 20) m 6 11,000 66,000
RAB-MEP (ELC) 17
BILL OF QUANTITY
PROYEK : PEMBANGUNAN GEDUNG DENSUS
LOKASI : RENCANA ANGGARAN BIAYA PEKERJAAN MEKANIKAL & ELEKTRIKAL
PEKERJAAN : PLUMBING, VAC, PEMADAM KEBAKARAN, ELEKTRIKAL, ELEKTRONIK.
C.1 Lantai 1
1 Smoke Detector (Photo Electric) bh 34 570,000 19,380,000
2 Manual Alarm Push Button bh 2 247,500 495,000
3 Alarm Bell bh 2 440,000 880,000
4 alarm Indicator Lamp bh 2 590,000 1,180,000
5 Fire Intercom Jack bh 2 320,000 640,000
6 end Of Line bh 3 44,000 132,000
7 Terminal Box Fire Alarm c/w Module unit 1 6,500,000 6,500,000
8 Inst. Fire Alarm NYA 2 x 1,5 mm² (PVC Cond Ø 20) ttk 38 275,000 10,450,000
9 Inst. Manual Push Button FRC 2 x 1,5 mm² (PVC Cond H.I Ø 20) ttk 2 195,000 390,000
10 Inst. Alarm Bell FRC 2 x 1,5 mm² (PVC Cond H.I Ø 20) ttk 2 195,000 390,000
11 Inst. Alarm Lamp FRC 2 x 1,5 mm² (PVC Cond H.I Ø 20) ttk 2 195,000 390,000
12 Inst. Fire Intercom Jack ITC 2 x 2 x 0,6 mm² (PVC Cond H.I Ø 20) ttk 2 550,000 1,100,000
(PVC Cond Ø 20)
Sub Total - C.1 41,927,000
C.2 Lantai 2
C.3 Lantai 3
RAB-MEP (ELC) 18
BILL OF QUANTITY
PROYEK : PEMBANGUNAN GEDUNG DENSUS
LOKASI : RENCANA ANGGARAN BIAYA PEKERJAAN MEKANIKAL & ELEKTRIKAL
PEKERJAAN : PLUMBING, VAC, PEMADAM KEBAKARAN, ELEKTRIKAL, ELEKTRONIK.
C.1 Lantai 1
C.2 Lantai 2
RAB-MEP (ELC) 19
BILL OF QUANTITY
PROYEK : PEMBANGUNAN GEDUNG DENSUS
LOKASI : RENCANA ANGGARAN BIAYA PEKERJAAN MEKANIKAL & ELEKTRIKAL
PEKERJAAN : PLUMBING, VAC, PEMADAM KEBAKARAN, ELEKTRIKAL, ELEKTRONIK.
C.3 Lantai 3
RAB-MEP (ELC) 20