TOTAL
NO URAIAN PEKERJAAN
(Rp)
I PEKERJAAN ELEKTRIKAL
A SAMBUNGAN DAYA LISTRIK PLN (Sistem TM 20 kV) #NAME?
B PEKERJAAN PANEL TEGANGAN MENENGAH #NAME?
C PEKERJAAN TRANSFORMATOR #NAME?
D PEKERJAAN PANEL TEGANGAN RENDAH #NAME?
E PEKERJAAN KABEL TEGANGAN MENENGAH #NAME?
F PEKERJAAN KABEL TEGANGAN RENDAH #NAME?
G PEKERJAAN INSTALASI PENERANGAN DAN STOP KONTAK #NAME?
H PEKERJAAN RAK KABEL #NAME?
I PEKERJAAN INSTALASI PENANGKAL PETIR #NAME?
TOTAL PEKERJAAN ELEKTRIKAL #NAME?
II PEKERJAAN ELEKTRONIK
A PEKERJAAN FIRE ALARM Err:509
C PEKERJAAN KABEL TRAY ELEKTRONIK Err:509
D PEKERJAAN TATA SUARA Err:509
TOTAL PEKERJAAN ELEKTRONIK Err:509
III PEKERJAAN MEKANIKAL
A PEKERJAAN PLUMBING Err:509
B PEKERJAAN PEMADAM KEBAKARAN #NAME?
C PEKERJAAN AC Err:509
D PEKERJAAN ESCALATOR Err:509
TOTAL PEKERJAAN MEKANIKAL Err:509
TOTAL PEKERJAAN MEKANIKAL & ELEKTRIKAL #NAME?
Terbilang : Delapan Miliyar Lima Ratus Empat Belas Juta Seratus Dua Belas Ribu Dua Ratus Tujuh
Puluh Enam Rupiah
Konsultan Perencana
PT. PERENCANA INDAH
ENGINEERING
TERKOREKSI
A LANTAI 1
PEKERJAAN AIR CONDITIONING
INSTALASI DUCTING
Bahan PU
- ukuran 160 cm x 50cm m 13.20 -
- ukuran 150 cm x 40cm m 26.60 -
- ukuran 120 cm x 40cm m 14.60 -
- ukuran 110 cm x 40cm m 23.20 -
- ukuran 100 cm x 40cm m 16.20 -
- ukuran 90 cm x 40cm m 20.80 -
- ukuran 60 cm x 30cm m 65.40 -
Grill Supplay 55 cm x 55 cm set 42.00 -
Grill Return 60 cm x 40 cm set 24.00 -
Rounduct 8" m 2.00 -
NO. URAIAN PEKERJAAN SAT VOL HARGA SATUAN JUMLAH HARGA
B LANTAI 2
PEKERJAAN AIR CONDITIONING
INSTALASI DUCTING
Bahan PU
- ukuran 160 cm x 50cm m 12.24 -
- ukuran 150 cm x 40cm m 24.50 -
- ukuran 120 cm x 40cm m 13.20 -
- ukuran 110 cm x 40cm m 21.60 -
- ukuran 100 cm x 40cm m 14.40 -
- ukuran 90 cm x 40cm m 13.20 -
- ukuran 60 cm x 30cm m 52.80 -
Grill Supplay 55 cm x 55 cm set 42.00 -
Grill Return 60 cm x 40 cm set 16.00 -
Rounduct 8" m 2.00 -
TOTAL PEKERJAAN AC -
RENCANA ANGGARAN BIAYA ( RAB )
PEKERJAAN MEP
RENCANA ANGGARAN BIAYA
GEDUNG PAMERAN NTT FAIR
PEKERJAAN ELEKTRIKAL
TERKOREKSI
ELEKTRIKAL
MVDP, 20 kV :
- Incoming cubicle unit 1.00 -
- Outgoing cubicle
Testing & commissioning lot 1.00 -
C PEKERJAAN TRANSFORMATOR
Lantai Basement II
Lampu TL Balk Premium 1 x 36 watt bh 32.00 -
Lampu dinding 40 W bh 8.00 -
Saklar tunggal bh 2.00 -
Saklar seri bh 2.00 -
Stop kontak bh 8.00 -
Instalasi penerangan ttk 40.00 -
Instalasi stop kontak ttk 8.00 -
Lantai I
Down light DLS 24 W bh 277.00 -
Down light PLC 18 W bh 18.00 -
Down light PLC 8 W bh 8.00 -
Exhaust fan bh 8.00 -
Saklar tunggal bh 40.00 -
Saklar seri bh 75.00 -
Stop kontak bh 115.00 -
Instalasi penerangan ttk 303.00 -
Instalasi stop kontak ttk 115.00 -
Lantai II
Down light DLS 24 W bh 272.00 -
Down light PLC 18 W bh 18.00 -
Down light PLC 8 W bh 8.00 -
Exhaust fan bh 8.00 -
Saklar tunggal bh 40.00 -
Saklar seri bh 75.00 -
Stop kontak bh 110.00 -
Instalasi penerangan ttk 298.00 -
Instalasi stop kontak ttk 110.00 -
Lantai I
Kabel Leder 800 x 100 20.00 -
Tray kabel 400 x 100 140.00 -
Tee 300 2.00 -
Elbow 90°, 300 4.00 -
Accessories dan material bantu 1.00 -
Lantai II
Tray kabel 400 x 100 140.00 -
Tee 300 2.00 -
Elbow 90°, 300 4.00 -
Accessories dan material bantu 1.00 -
TERKOREKSI
HARGA JUMLAH
NO. URAIAN PEKERJAAN SAT VOL
SATUAN HARGA
PERALATAN UTAMA
Pipa
Pipa Hydrant (BSP Sch 40, incl. accessories)
1 BSP ø 1 1/2 inc m 9.00 -
2 BSP ø 2 1/2 inc m 95.00 -
3 BSP ø 4 inc m 10.00 -
4 BSP ø 6 inc m 20.00 -
Pipa
Pipa Hydrant (BSP Sch 40, incl. accessories)
1 BSP ø 1 1/2 inc m 9.00 -
2 BSP ø 2 1/2 inc m 95.00 -
3 BSP ø 4 inc m 10.00 -
4 BSP ø 6 inc m 8.00 -
TERKOREKSI
HARGA JUMLAH
NO. URAIAN PEKERJAAN SAT VOL
SATUAN HARGA
PEKERJAAN PLUMBING
I SISTEM AIR BERSIH
A Pompa Transfer bh 2.00 -
Type : NF 30
Jenis : Centrifugal
Kapasitas : 24 m3/h
Head : 25 m
Power : 3 KW
- Panel Control unit 1.00 -
SUB TOTAL PEKERJAAN PERALATAN UTAMA AIR BERSIH & AIR PANAS -
HARGA JUMLAH
NO. URAIAN PEKERJAAN SAT VOL
SATUAN HARGA
lengkap ; air blower, submersible pump, box screen, air diffuser, biomedia,
chlorination, fliter, instalasi & accessories, panel kontrol
D Testing Commissioning Peralatan Utama Air Kotor & Air Bekas lot 1.00 -
IV RUANG POMPA
A RUANG POMPA
Lantai I
Pipa
1 Pipa diameter DN 40 mm m 55.00 -
2 Pipa diameter DN 32 mm m 105.00 -
3 Pipa diameter DN 25 mm m 20.00 -
4 Pipa diameter DN 20 mm m 120.00 -
Valve dan Instruments
8 Gate Valve diameter 1 1/4" bh 2.00 -
9 Gate Valve diameter 1" bh 2.00 -
HARGA JUMLAH
NO. URAIAN PEKERJAAN SAT VOL
SATUAN HARGA
Lantai II
Pipa AirBersih
1 Pipa diameter DN 40 mm m 50.00 -
2 Pipa diameter DN 32 mm m 95.00 -
3 Pipa diameter DN 25 mm m 20.00 -
4 Pipa diameter DN 20 mm m 75.00 -
Valve dan Instruments
8 Gate Valve diameter 1 1/4" bh 4.00 -
9 Gate Valve diameter 1" bh 2.00 -
C Pekerjaan Inatalasi Pipa Air Kotor, Air Bekas, Air Bekas Kimia dan Vent
Pipa
Lantai I
Pipa
1 Pipa diameter 150 mm m 216.00 -
2 Pipa diameter 100 mm m 145.00 -
3 Pipa diameter 80 mm m 90.00 -
Instruments
8 Clean Out ( FCO ) diameter 100 mm bh 2.00 -
9 Clean Out ( FCO ) diameter 80 mm bh 2.00 -
10 Floor Drain bh 22.00 -
11 P - Trap bh 22.00 -
Lantai I
Pipa
1 Pipa diameter 150 mm m 100.00 -
2 Pipa diameter 100 mm m 168.00 -
3 Pipa diameter 80 mm m 48.00 -
4 Pipa diameter 50 mm m 40.00 -
5 Pipa diameter 40 mm m 27.00 -
6 Pipa diameter 32 mm m 40.00 -
Instruments
8 Clean Out ( FCO ) diameter 100 mm bh 8.00 -
9 Clean Out ( FCO ) diameter 80 mm bh 4.00 -
10 Floor Drain bh 14.00 -
11 P - Trap bh 14.00 -
HARGA JUMLAH
NO. URAIAN PEKERJAAN SAT VOL
SATUAN HARGA
Lantai II
Pipa
1 Pipa diameter 100 mm m 59.50 -
2 Pipa diameter 80 mm m 38.00 -
3 Pipa diameter 50 mm m 56.00 -
4 Pipa diameter 40 mm m 18.00 -
5 Pipa diameter 32 mm m 127.00 -
Instruments
7 Clean Out ( FCO ) diameter 100 mm bh 4.00 -
8 Clean Out ( FCO ) diameter 80 mm bh 4.00 -
9 Floor Drain bh 5.00 -
10 P - Trap bh 7.00 -
Terminal Box
TBF-Basement unit 1.00 -
TBF-I unit 1.00 -
TBF-II unit 1.00 -
Lantai I
- ROR Heat Detector unit 65.00 -
- FIX Heat Detector unit 1.00 -
- Manual Break Glass Switch unit 1.00 -
- Indicator lamp unit 3.00 -
- Alarm bell unit 3.00 -
- Instalasi detector ttk 66.00 -
- Instalasi alarm bell + indicator lamp ttk 6.00 -
- Instalasi break glass switch ttk 1.00 -
Lantai II
- ROR Heat Detector unit 58.00 -
- FIX Heat Detector unit 1.00 -
- Manual Break Glass Switch unit 1.00 -
- Indicator lamp unit 3.00 -
- Alarm bell unit 3.00 -
- Instalasi detector ttk 59.00 -
- Instalasi alarm bell + indicator lamp ttk 6.00 -
- Instalasi break glass switch ttk 1.00 -
LANTAI I
- Kabel Tray 200 12.00 -
- Equal tee 200 2.00 -
- Accessories dan material bantu 1.00 -
LANTAI I
- Kabel Tray 200 12.00 -
- Equal tee 200 2.00 -
- Accessories dan material bantu 1.00 -
LANTAI I
- Kabel Tray 200 36.00 -
- Equal tee 200 2.00 -
- Accessories dan material bantu 1.00 -
Lantai II
- Kabel Tray 200 35.00 -
- Equal tee 200 2.00 -
- Accessories dan material bantu 1.00 -
TERKOREKSI
HARGA JUMLAH
NO. URAIAN PEKERJAAN SAT VOL
SATUAN HARGA
I TATA SUARA
A PEKERJAAN PERALATAN UTAMA
B PEKERJAAN INSTALASI
Lantai 1
Terminal Box ( TB ) unit 1.00 -
Ceilling Speaker bh 46.00 -
Speaker dinding 10 W bh 6.00 -
Titik instalasi Tata suara ttk 52.00 -
Lantai 2
Terminal Box ( TB ) unit 1.00 -
Ceilling Speaker bh 29.00 -
Speaker dinding 10 W bh 6.00 -
Titik instalasi Tata suara ttk 35.00 -
PEKERJAAN INSTALASI
Lantai Basement
### Indoor Camera, IR Fixed 2.0 MP dome analog 3.00 bh -
camere 3,6 mm
LANTAI 1
### Indoor Camera, IR Fixed 2.0 MP dome analog 8.00 bh -
camere 3,6 mm
LANTAI 2
Indoor Camera, IR Fixed 2.0 MP dome analog
### camere 3,6 mm 8.00 unit -