REKAPITULASI RENCANA ANGGARAN BIAYA


ENGINEERING ESTIMATE (EE)

PEKERJAAN : PROYEK PEMBANGUNAN GEDUNG PAMERAN DAN HOTEL KUPANG -NTT


LOKASI : KOTA KUPANG
SUB PEKERJAAN : PEMBANGUNAN GEDUNG PAMERAN
TAHUN ANGGARAN : 2017

TOTAL
NO URAIAN PEKERJAAN
(Rp)
I PEKERJAAN ELEKTRIKAL
A SAMBUNGAN DAYA LISTRIK PLN (Sistem TM 20 kV) #NAME?
B PEKERJAAN PANEL TEGANGAN MENENGAH #NAME?
C PEKERJAAN TRANSFORMATOR #NAME?
D PEKERJAAN PANEL TEGANGAN RENDAH #NAME?
E PEKERJAAN KABEL TEGANGAN MENENGAH #NAME?
F PEKERJAAN KABEL TEGANGAN RENDAH #NAME?
G PEKERJAAN INSTALASI PENERANGAN DAN STOP KONTAK #NAME?
H PEKERJAAN RAK KABEL #NAME?
I PEKERJAAN INSTALASI PENANGKAL PETIR #NAME?
TOTAL PEKERJAAN ELEKTRIKAL #NAME?
II PEKERJAAN ELEKTRONIK
A PEKERJAAN FIRE ALARM Err:509
C PEKERJAAN KABEL TRAY ELEKTRONIK Err:509
D PEKERJAAN TATA SUARA Err:509
TOTAL PEKERJAAN ELEKTRONIK Err:509
III PEKERJAAN MEKANIKAL
A PEKERJAAN PLUMBING Err:509
B PEKERJAAN PEMADAM KEBAKARAN #NAME?
C PEKERJAAN AC Err:509
D PEKERJAAN ESCALATOR Err:509
TOTAL PEKERJAAN MEKANIKAL Err:509
TOTAL PEKERJAAN MEKANIKAL & ELEKTRIKAL #NAME?
Terbilang : Delapan Miliyar Lima Ratus Empat Belas Juta Seratus Dua Belas Ribu Dua Ratus Tujuh
Puluh Enam Rupiah

Kupang, Desember 2017

Konsultan Perencana
PT. PERENCANA INDAH
ENGINEERING

LUHUT MANALU, ST,MT


Direktur Utama
RENCANA ANGGARAN BIAYA ( RAB )
RENCANA ANGGARAN BIAYA
GEDUNG PAMERAN NTT FAIR
PEKERJAAN AC

TERKOREKSI

NO. URAIAN PEKERJAAN SAT VOL HARGA SATUAN JUMLAH HARGA

A LANTAI 1
PEKERJAAN AIR CONDITIONING

Unit AC DUCTED 15 PK Freon R410a unit 6.0 -


Unit AC DUCTED 10 PK Freon R410a unit 6.0 -
INSTALASI AC
Pipa refrigerant lengkap dengan isolasi 19 mm : m 262.00 -
Ø 1 3/8 " x 5/8 "
Pipa Drain / pembuangan air AC
- Pipa PVC 1 1/4" + isolasi aeroflex / superlon tebal 9 mm m 487.0 -
Kabel Power AC :
Kabel kontrol indoor ke outdoor kabel NYM 2 x ( 4 x 2,5 ) mm m 560.0 -
Instalasi Remote AC ttk 12.0 -
Dudukan Indoor set 12.0 -
Dudukan Outdoor set 12.0 -
Commisioning Test lots 1.0 -

INSTALASI DUCTING
Bahan PU
- ukuran 160 cm x 50cm m 13.20 -
- ukuran 150 cm x 40cm m 26.60 -
- ukuran 120 cm x 40cm m 14.60 -
- ukuran 110 cm x 40cm m 23.20 -
- ukuran 100 cm x 40cm m 16.20 -
- ukuran 90 cm x 40cm m 20.80 -
- ukuran 60 cm x 30cm m 65.40 -
Grill Supplay 55 cm x 55 cm set 42.00 -
Grill Return 60 cm x 40 cm set 24.00 -
Rounduct 8" m 2.00 -
NO. URAIAN PEKERJAAN SAT VOL HARGA SATUAN JUMLAH HARGA

B LANTAI 2
PEKERJAAN AIR CONDITIONING

Unit AC DUCTED 15 PK Freon R410a unit 6.0 -


Unit AC DUCTED 10 PK Freon R410a unit 6.0 -
INSTALASI AC
Pipa refrigerant lengkap dengan isolasi 19 mm : m 262.00 -
Ø 1 3/8 " x 5/8 "
Pipa Drain / pembuangan air AC
- Pipa PVC 1 1/4" + isolasi aeroflex / superlon tebal 9 mm m 487.0 -
Kabel Power AC :
Kabel kontrol indoor ke outdoor kabel NYM 2 x ( 4 x 2,5 ) mm m 560.0 -
Instalasi Remote AC ttk 12.0 -
Dudukan Indoor set 12.0 -
Dudukan Outdoor set 12.0 -
Commisioning Test lots 1.0 -

INSTALASI DUCTING
Bahan PU
- ukuran 160 cm x 50cm m 12.24 -
- ukuran 150 cm x 40cm m 24.50 -
- ukuran 120 cm x 40cm m 13.20 -
- ukuran 110 cm x 40cm m 21.60 -
- ukuran 100 cm x 40cm m 14.40 -
- ukuran 90 cm x 40cm m 13.20 -
- ukuran 60 cm x 30cm m 52.80 -
Grill Supplay 55 cm x 55 cm set 42.00 -
Grill Return 60 cm x 40 cm set 16.00 -
Rounduct 8" m 2.00 -

TOTAL PEKERJAAN AC -
RENCANA ANGGARAN BIAYA ( RAB )
PEKERJAAN MEP
RENCANA ANGGARAN BIAYA
GEDUNG PAMERAN NTT FAIR
PEKERJAAN ELEKTRIKAL

TERKOREKSI

NO. URAIAN PEKERJAAN SAT VOL HARGA SATUAN JUMLAH HARGA

ELEKTRIKAL

A SAMBUNGAN DAYA LISTRIK PLN (Sistem TM 20 kV)


Biaya perizinan penyambungan daya listrik PLN dengan Sistem
Sambungan Tegangan Menengah 20kV, Kap.690 Kva
BP +UJL PLN VA 690,000 -
SL0 VA 690,000 -

SUB TOTAL PEKERJAAN SAMBUNGAN DAYA -

B PEKERJAAN PANEL TEGANGAN MENENGAH


Pengadaan, pemasangan dan pengujian seluruh pekerjaan
panel tegangan menengah yang etrdiri dari panel incoming
dan outgoing lengkap dengan accessories lainnya sesuai
dengan gambar rencana dan spesifikasi teknis.

MVDP, 20 kV :
- Incoming cubicle unit 1.00 -
- Outgoing cubicle
Testing & commissioning lot 1.00 -

SUB TOTAL PEK. PANEL TM -

C PEKERJAAN TRANSFORMATOR

Pengadaan, pemasangan dan pengujian seluruh pekerjaan


transformator 20kV, 50 Hz lengkap dengan accessories lainnya
sesuai dengan gambar rencana dan spesifikasi teknis.

Transformator, Type : Oil Immerse Kap. 800 kVA, unit 1.00 -


20 kV/400 V, 50 Hz, DYn5.
Lightning arrester 20 kV, 50 Hz. buah 1.00 -
Instalasi pembumian
- Titik netral trafo BC 95 mm² lengkap dengan elektroda pembumian. lot 1.00 -
- Body trafo BC 95 lengkap dengan elektroda pembumian. lot 1.00 -
Material bantu lot 1.00 -
Testing & commissioning lot 1.00 -

SUB TOTAL PEK. TRANSFORMATOR -


NO. URAIAN PEKERJAAN SAT VOL HARGA SATUAN JUMLAH HARGA

D PEKERJAAN PANEL TEGANGAN RENDAH

Pengadaan, pemasangan dan pengujian pekerjaan panel


tegangan rendah lengkap dengan MCCB, MCB, relay-relay
dan accessories lainnya sesuai dengan gambar rencana dan
spesifikasi teknis.
1.00 PDTR unit 1.00 -
Capasitor Bank,
2.00 SDP I unit 1.00 -
1.00 SDP AC unit 1.00 -
3.00 P AC.1 Lantai I unit 1.00 -
2.00 P AC. 2 Lantai II unit 1.00 -
4.00 PP 1 Lantai I unit 1.00 -
3.00 PP 2 Lantai II unit 1.00 -
5.00 P. B unit 1.00 -
6.00 P. STP unit 1.00 -
7.00 FUSE BOX Stand Pameran 1-33 Lt 1 unit 33.00 -
8.00 FUSE BOX Stand Pameran 1-36 Lt 2 unit 36.00 -
9.00 KWH Meter Stand Pameran 1-33 Lt 1 unit 33.00 -
### KWH Meter Stand Pameran 1-36 Lt 2 unit 36.00 -

SUB TOTAL PEK. PANEL TR -

E PEKERJAAN KABEL TEGANGAN MENENGAH

Kabel dari gardu PLN menuju ke :


- MVDP : N2XSEFGbY 3 x 95 mm² mtr 45.00 -
Kabel dari MVDP ke :
- Sisi primer trafo : N2XSY 3 x 1 x 95 mm² mtr 15.00 -

SUB TOTAL PEK. KABEL TM -


NO. URAIAN PEKERJAAN SAT VOL HARGA SATUAN JUMLAH HARGA

F PEKERJAAN KABEL TEGANGAN RENDAH


Pengadaan, pemasangan dan pengujian seluruh pekerjaan
kabel tegangan rendah berbagai ukuran lengkap dengan
schoen kabel, dan accessories lainnya sesuai
dengan gambar rencana dan spesifikasi teknis.

Kabel dari sisi sekunder trafo ke :


PDTR : NYY 4 (4 x 1 x 300 mm²) mtr 15.00 -
Kabel dari Genset ke :
- P-Genset (AMF Panel) : NYY 4 (4 x 1 x 300 mm²) mtr 20.00 -
Kabel dari P-Genset (AMF Panel) ke :
PDTR : NYY 4 (4 x 1 x 300 mm²) mtr 25.00 -
Kabel dari PDTR ke :
Capasitor Bank : NYY 4 (4 x 1 x 300 mm²) mtr 12.00 -
SDP AC Lantai 1 : NYY 4 (4 x 1 x 240 mm²) mtr 15.00 -
SDP 1 Lantai I : NYY 4 x 185 mm²+ BC 70mm² mtr 28.00 -
Kabel dari SDP I ke :
PP.1 : NYY 4 x 70 mm² + BC 25mm² mtr 20.00 -
PP.2 : NYY 4 x 95 mm² + BC 50 mm² mtr 30.00 -
P.B : NYY 4 x 16 mm² + BC 6mm² mtr 20.00 -

Kabel dari SDP AC ke :


P AC.1 : NYY 2(4 x 1 x 185 mm²) mtr 10.00 -
P AC.2 : NYY 2(4 x 1 x 185 mm²) mtr 30.00 -
Kabel dari P AC 1 ke :
Indor Unit AC 1-12 Lantai 1 : NYY 4 x 16 mm² + BC 6mm² mtr 754.00 -
Kabel dari P AC 2 ke :
Indor Unit AC 1-12 Lantai 2 : NYY 4 x 16 mm² + BC 6mm² mtr 734.00 -
Kabel dari P. B ke :
P.Pompa Transfer : NYY 4 x 10 mm² + BC 6mm² mtr 20.00
PIT. Peluap 1 : NYY 4 x 4 mm² + NYA 6mm² mtr 27.00
PIT. Peluap 2 : NYY 4 x 4 mm² + NYA 6mm² mtr 60.00
Kabel dari PP. 1 ke :
FUSE BOX Stand Pameran 1-33 Lt 1 : NYM 3 x 4 mm² + BC 2,5mm² mtr 1,950.00
Kabel dari PP. 2 ke :
FUSE BOX Stand Pameran 1-36 Lt 2 : NYM 3 x 4 mm² + BC 2,5mm² mtr 2,010.00
P.ESC. : NYY 4 x 16 mm² + BC 6mm² mtr 98.00 -
Kabel dari P. Pompa ke :
Pompa Transfer : NYY 4 x 4 mm² + NYA 6mm² mtr 20.00 -

SUB TOTAL PEK. KABEL TR -


NO. URAIAN PEKERJAAN SAT VOL HARGA SATUAN JUMLAH HARGA

G PEKERJAAN INSTALASI PENERANGAN DAN STOP KONTAK


Pengadaan, pemasangan dan pengujian seluruh pekerjaan
instalasi penerangan dan stop kontak lengkap dengan
accessories lainnya sesuai dengan gambar rencana dan
spesifikasi teknis.

Lantai Basement II
Lampu TL Balk Premium 1 x 36 watt bh 32.00 -
Lampu dinding 40 W bh 8.00 -
Saklar tunggal bh 2.00 -
Saklar seri bh 2.00 -
Stop kontak bh 8.00 -
Instalasi penerangan ttk 40.00 -
Instalasi stop kontak ttk 8.00 -

Lantai I
Down light DLS 24 W bh 277.00 -
Down light PLC 18 W bh 18.00 -
Down light PLC 8 W bh 8.00 -
Exhaust fan bh 8.00 -
Saklar tunggal bh 40.00 -
Saklar seri bh 75.00 -
Stop kontak bh 115.00 -
Instalasi penerangan ttk 303.00 -
Instalasi stop kontak ttk 115.00 -

Lantai II
Down light DLS 24 W bh 272.00 -
Down light PLC 18 W bh 18.00 -
Down light PLC 8 W bh 8.00 -
Exhaust fan bh 8.00 -
Saklar tunggal bh 40.00 -
Saklar seri bh 75.00 -
Stop kontak bh 110.00 -
Instalasi penerangan ttk 298.00 -
Instalasi stop kontak ttk 110.00 -

SUB TOTAL PEK. INST. PENERANGAN DAN STOP KONTAK -


NO. URAIAN PEKERJAAN SAT VOL HARGA SATUAN JUMLAH HARGA

H PEKERJAAN RAK KABEL


Pengadaan dan pemasangan instalasi kabel rak lengkap dengan
penggantung, support dan accessories lainnya sesuai dengan
gambar rencana dan spesifikasi teknis.

Lantai I
Kabel Leder 800 x 100 20.00 -
Tray kabel 400 x 100 140.00 -
Tee 300 2.00 -
Elbow 90°, 300 4.00 -
Accessories dan material bantu 1.00 -

Lantai II
Tray kabel 400 x 100 140.00 -
Tee 300 2.00 -
Elbow 90°, 300 4.00 -
Accessories dan material bantu 1.00 -

SUB TOTAL PEK. KABEL TRAY -

I PEKERJAAN INSTALASI PENANGKAL PETIR


Pengadaan, pemasangan dan pengujian pekerjaan instalasi
penangkal petir lengkap dengan accessories lainnya sesuai
dengan gambar rencana dan spesifikasi teknis.

- Penangkal Petir Type Konventional unit 6.00 -


- Kabel BC 50 mm2 dalam konduit mtr 135.00 -
- Grounding max 2 ohm unit 2.00 -
- Bok Kontrol uk. 40 x 40 x 30 cm unit 2.00 -
- Biaya pemasangan lsm 1.00 -
- Biaya Izin Disnaker setempat unit 1.00 -

SUB TOTAL PEK. PENANGKAL PETIR -


RENCANA ANGGARAN BIAYA ( RAB )
PEKERJAAN MEP
RENCANA ANGGARAN BIAYA
GEDUNG PAMERAN NTT FAIR
PEKERJAAN PEMADAM KEBAKARAN

TERKOREKSI
HARGA JUMLAH
NO. URAIAN PEKERJAAN SAT VOL
SATUAN HARGA
PERALATAN UTAMA

PEKERJAAN INSTALASI PIPA HYDRANT DAN SPRINKLER


A Pekerjaan Instalasi Pipa Hydrant dan Sprinkler
Pemipaan
Lantai I
1 Hydrant Box (Indoor) c/w instalasi unit 3.00 -
Material Steel, t 1,2 mm
Dimensi (1250 x 750 x 180) mm
House Rack 40 mm x 30 m
Fire House 1,5 inc
Hydrant Nozzle 1,5 inc
Alarm bel
Manual push button, jack telepon
Indicator lamp

Pipa
Pipa Hydrant (BSP Sch 40, incl. accessories)
1 BSP ø 1 1/2 inc m 9.00 -
2 BSP ø 2 1/2 inc m 95.00 -
3 BSP ø 4 inc m 10.00 -
4 BSP ø 6 inc m 20.00 -

Pipa Sprinkler (BSP Sch 40, incl. accessories)


1 BSP ø 1 inc m 590.00 -
2 BSP ø 1 1/4 inc m 174.00 -
3 BSP ø 1 1/2 inc m 65.00 -
4 BSP ø 3 inc m 220.00 -
5 BSP ø 4 inc m 16.00 -
6 BSP ø 6 inc m 8.00 -

Valve dan Instruments


Valve (Class 20 K) & Accessories
3 Flow switch bh 1.00 -
4 Head sprinkler (pendent type) bh 239.00 -
5 Perssure gauge c/w gate valve & accessories bh 1.00 -
9 Branch control valve set 1.00 -
HARGA JUMLAH
NO. URAIAN PEKERJAAN SAT VOL
SATUAN HARGA
Lantai II
1 Hydrant Box (Indoor) c/w instalasi unit 3.00 -
Material Steel, t 1,2 mm
Dimensi (1250 x 750 x 180) mm
House Rack 40 mm x 30 m
Fire House 1,5 inc
Hydrant Nozzle 1,5 inc
Alarm bel
Manual push button, jack telepon
Indicator lamp

Pipa
Pipa Hydrant (BSP Sch 40, incl. accessories)
1 BSP ø 1 1/2 inc m 9.00 -
2 BSP ø 2 1/2 inc m 95.00 -
3 BSP ø 4 inc m 10.00 -
4 BSP ø 6 inc m 8.00 -

Pipa Sprinkler (BSP Sch 40, incl. accessories)


1 BSP ø 1 inc m 528.00 -
2 BSP ø 1 1/4 inc m 140.00 -
3 BSP ø 1 1/2 inc m 65.00 -
4 BSP ø 3 inc m 205.00 -
5 BSP ø 4 inc m 16.00 -
6 BSP ø 6 inc m 8.00 -

Valve dan Instruments


Valve (Class 20 K) & Accessories
4 Head sprinkler (pendent type) bh 194.00 -
6 Branch control valve set 1.00 -

TOTAL PEKERJAAN PEMADAM KEBAKARAN -


RENCANA ANGGARAN BIAYA ( RAB )
PEKERJAAN MEP

RENCANA ANGGARAN BIAYA


GEDUNG PAMERAN NTT FAIR
PEKERJAAN PLUMBING

TERKOREKSI
HARGA JUMLAH
NO. URAIAN PEKERJAAN SAT VOL
SATUAN HARGA
PEKERJAAN PLUMBING
I SISTEM AIR BERSIH
A Pompa Transfer bh 2.00 -
Type : NF 30
Jenis : Centrifugal
Kapasitas : 24 m3/h
Head : 25 m
Power : 3 KW
- Panel Control unit 1.00 -

B Pompa Sumpit ( peluap) set 2.00 -


Merk : Ground fos
Type : DPK 10.50
Jenis : Sumbersible
Kapasitas : 330 lpm
Head : 15 m
Disch : 2"
Power : 3 KW
Panel Control unit 1.00 -

PERALATAN UTAMA LANTAI ATAP

A Tangki Air Kapasitas 3.100 liter ( Plastik) unit 2.00 -

B Testing Commissioning Peralatan Utama Air Bersih lot 1.00 -

SUB TOTAL PEKERJAAN PERALATAN UTAMA AIR BERSIH & AIR PANAS -
HARGA JUMLAH
NO. URAIAN PEKERJAAN SAT VOL
SATUAN HARGA

III SISTEM AIR KOTOR & AIR BEKAS


A Sewage Treatment Plan paket 1.00 -
Capasity : 10 m3/day

lengkap ; air blower, submersible pump, box screen, air diffuser, biomedia,
chlorination, fliter, instalasi & accessories, panel kontrol

D Testing Commissioning Peralatan Utama Air Kotor & Air Bekas lot 1.00 -

SUB TOTAL PEKERJAAN PERALATAN UTAMA AIR KOTOR -

IV RUANG POMPA
A RUANG POMPA

Pengadaan dan pemasangan pipa PPR-PN 10 lengkap penyangga yang diperlukan

1 Pipa diameter DN 50 mm m 40.00 -


2 Header GIP diameter 100 mm , 4 meter panjang unit 1.00 -
3 Pipa GIP diameter 100 mm m 12.00 -

Valve dan Instruments


1 Gate valve diameter 2 1/.2" bh 2.00 -
2 Gate valve diameter 2" bh 4.00 -
3 Gate valve diameter 1 1/4" bh 2.00 -
4 Check valve diameter 2 1/2" bh 2.00 -
5 Strainer diameter 2 1/2" bh 2.00 -
6 Flexible diameter 2 1/2" bh 2.00 -
7 Foot Valve diameter 2 1/2" bh 2.00 -
8 Water Level Control ( WLC )diameter 1 1/.4" set 1.00 -

SUB TOTAL PEKERJAAN INSTALASI RUANG POMPA -

V PEKERJAAN INSTALASI PIPA DALAM GEDUNG


A Pekerjaan Instalasi Pipa Air Bersih
Pemipaan

Pengadaan dan pemasangan pipa PPR-PN 10 lengkap aksessories yang diperlukan

Lantai I
Pipa
1 Pipa diameter DN 40 mm m 55.00 -
2 Pipa diameter DN 32 mm m 105.00 -
3 Pipa diameter DN 25 mm m 20.00 -
4 Pipa diameter DN 20 mm m 120.00 -
Valve dan Instruments
8 Gate Valve diameter 1 1/4" bh 2.00 -
9 Gate Valve diameter 1" bh 2.00 -
HARGA JUMLAH
NO. URAIAN PEKERJAAN SAT VOL
SATUAN HARGA
Lantai II
Pipa AirBersih
1 Pipa diameter DN 40 mm m 50.00 -
2 Pipa diameter DN 32 mm m 95.00 -
3 Pipa diameter DN 25 mm m 20.00 -
4 Pipa diameter DN 20 mm m 75.00 -
Valve dan Instruments
8 Gate Valve diameter 1 1/4" bh 4.00 -
9 Gate Valve diameter 1" bh 2.00 -

SUB TOTAL PEKERJAAN INSTALASI AIR BERSIH -

C Pekerjaan Inatalasi Pipa Air Kotor, Air Bekas, Air Bekas Kimia dan Vent

Pengadaan dan Pemasangan Pipa PVC AW kelas 10 kg/cm2 lengkap dengan


Aksessories yang diperlukan

Pipa
Lantai I
Pipa
1 Pipa diameter 150 mm m 216.00 -
2 Pipa diameter 100 mm m 145.00 -
3 Pipa diameter 80 mm m 90.00 -
Instruments
8 Clean Out ( FCO ) diameter 100 mm bh 2.00 -
9 Clean Out ( FCO ) diameter 80 mm bh 2.00 -
10 Floor Drain bh 22.00 -
11 P - Trap bh 22.00 -

Lantai I
Pipa
1 Pipa diameter 150 mm m 100.00 -
2 Pipa diameter 100 mm m 168.00 -
3 Pipa diameter 80 mm m 48.00 -
4 Pipa diameter 50 mm m 40.00 -
5 Pipa diameter 40 mm m 27.00 -
6 Pipa diameter 32 mm m 40.00 -
Instruments
8 Clean Out ( FCO ) diameter 100 mm bh 8.00 -
9 Clean Out ( FCO ) diameter 80 mm bh 4.00 -
10 Floor Drain bh 14.00 -
11 P - Trap bh 14.00 -
HARGA JUMLAH
NO. URAIAN PEKERJAAN SAT VOL
SATUAN HARGA
Lantai II
Pipa
1 Pipa diameter 100 mm m 59.50 -
2 Pipa diameter 80 mm m 38.00 -
3 Pipa diameter 50 mm m 56.00 -
4 Pipa diameter 40 mm m 18.00 -
5 Pipa diameter 32 mm m 127.00 -
Instruments
7 Clean Out ( FCO ) diameter 100 mm bh 4.00 -
8 Clean Out ( FCO ) diameter 80 mm bh 4.00 -
9 Floor Drain bh 5.00 -
10 P - Trap bh 7.00 -

SUB PEKERJAAN INSTALASI PIPA AIR KOTOR,BEKAS, BEKAS


-
KIMIA & VENT

TOTAL PEKERJAAN PLUMBING -


RENCANA ANGGARAN BIAYA ( RAB )
PEKERJAAN MEP

RENCANA ANGGARAN BIAYA


GEDUNG PAMERAN NTT FAIR
PEKERJAAN ESCALATOR
TERKOREKSI
HARGA JUMLAH
NO. URAIAN PEKERJAAN SAT VOL
SATUAN HARGA

1 ESCALATOR unit 2.0 -


Type : Indoor Escalator
Inclanation : 30°
Step Width : 1000 mm
Rise (mm) : 6000
Disignation Floor :G-1
Speed : 0.5 m/s
Motor Output Power : 5.5 KW
Main Power : 380 V - 3Phase - 50 Hz
Lighting Power : 220 V
Group Arrengement : Single Arrengement
Truss Type : Hollow section in L Shaped Steel
Horizontal Steep : Stainles Steel

3 Testing & commissioning unit 2.00 -

TOTAL PEKERJAAN LIFT & ESCALATOR -


RENCANA ANGGARAN BIAYA ( RAB )

RENCANA ANGGARAN BIAYA


GEDUNG PAMERAN NTT FAIR
PEKERJAAN FIRE ALARM
TERKOREKSI
HARGA JUMLAH
NO. URAIAN PEKERJAAN SAT VOL
SATUAN HARGA

A PEKERJAAN FIRE ALARM


1.00 PEKERJAAN PERALATAN UTAMA

Pengadaan, pemasangan dan pengujian pekerjaan instalasi


deteksi kebakaran (Fire Alarm Detector) lengkap dengan
material bantu dan accessories lainnya sesuai dengan gambar
rencana dan spesifikasi teknis.

MCFA Kap. 30 Zone lengkap dengan : unit 1.00 -


- Power surge arrester
- Rectifier
- Battery nicad

Terminal Box
TBF-Basement unit 1.00 -
TBF-I unit 1.00 -
TBF-II unit 1.00 -

Kabel Distribusi : kabel AWG 16 twisted CAT 5E


Kabel dari MCFA ke :
TBF-Basement mtr 15.00 -
TBF-I mtr 30.00 -
TBF-II mtr 40.00 -

2.00 Pekerjaan Instalasi Fire Alarm

Lantai I
- ROR Heat Detector unit 65.00 -
- FIX Heat Detector unit 1.00 -
- Manual Break Glass Switch unit 1.00 -
- Indicator lamp unit 3.00 -
- Alarm bell unit 3.00 -
- Instalasi detector ttk 66.00 -
- Instalasi alarm bell + indicator lamp ttk 6.00 -
- Instalasi break glass switch ttk 1.00 -

Lantai II
- ROR Heat Detector unit 58.00 -
- FIX Heat Detector unit 1.00 -
- Manual Break Glass Switch unit 1.00 -
- Indicator lamp unit 3.00 -
- Alarm bell unit 3.00 -
- Instalasi detector ttk 59.00 -
- Instalasi alarm bell + indicator lamp ttk 6.00 -
- Instalasi break glass switch ttk 1.00 -

Testing & commissioning lot 1.00 -

TOTAL PEK. FIRE ALARM -


RENCANA ANGGARAN BIAYA ( RAB )
###

RENCANA ANGGARAN BIAYA


GEDUNG PAMERAN NTT FAIR
PEKERJAAN TELEPHONE
TERKOREKSI
HARGA JUMLAH
NO. URAIAN PEKERJAAN SAT VOL
SATUAN HARGA

C PEKERJAAN KABEL TRAY ELEKTRONIK


Pengadaan dan pemasangan instalasi kabel tray elektronik lengkap dengan
penggantung, support dan accessories lainnya sesuai dengan
gambar rencana dan spesifikasi teknis.

LANTAI I
- Kabel Tray 200 12.00 -
- Equal tee 200 2.00 -
- Accessories dan material bantu 1.00 -

LANTAI I
- Kabel Tray 200 12.00 -
- Equal tee 200 2.00 -
- Accessories dan material bantu 1.00 -

LANTAI I
- Kabel Tray 200 36.00 -
- Equal tee 200 2.00 -
- Accessories dan material bantu 1.00 -

Lantai II
- Kabel Tray 200 35.00 -
- Equal tee 200 2.00 -
- Accessories dan material bantu 1.00 -

SUB TOTAL PEK. KABEL TRAY ELEKTRONIK -


RENCANA ANGGARAN BIAYA ( RAB )

RENCANA ANGGARAN BIAYA


GEDUNG PAMERAN NTT FAIR

PEKERJAAN TATA SUARA

TERKOREKSI
HARGA JUMLAH
NO. URAIAN PEKERJAAN SAT VOL
SATUAN HARGA
I TATA SUARA
A PEKERJAAN PERALATAN UTAMA

Pengadaan dan Pemasangan Tata Suara dan semua aksessories yang


diperlukan

1 Power Amplifier 240W unit 1.00 -


2 Mixer Amplifier 360 W with Zone Selector unit 1.00 -
3 Driver unit 50W with matching, ZH-652MD unit 4.00 -
4 Microphone with Chime unit 1.00 -
5 Portable Flight Case Rak unit 1.00 -
6 USB Player unit 1.00 -

B PEKERJAAN INSTALASI
Lantai 1
Terminal Box ( TB ) unit 1.00 -
Ceilling Speaker bh 46.00 -
Speaker dinding 10 W bh 6.00 -
Titik instalasi Tata suara ttk 52.00 -

Lantai 2
Terminal Box ( TB ) unit 1.00 -
Ceilling Speaker bh 29.00 -
Speaker dinding 10 W bh 6.00 -
Titik instalasi Tata suara ttk 35.00 -

C PEKERJAAN TESTING & COMMISSIONING


1 Testing & Commissioning pekerjaan Tata Suara lot 1.00 -

TOTAL PEKERJAAN TATA SUARA -


RENCANA ANGGARAN BIAYA
GEDUNG PAMERAN NTT FAIR
PEKERJAAN CCTV
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOL SAT
SATUAN HARGA
E PEKERJAAN CCTV
PEKERJAAN PERALATAN UTAMA
### Colour Monitor 20" ( Multi Screen ) 1.00 unit -
### Colour Monitor 17" 1.00 unit -
### DVR 16ch, CJ-HDR416 3.00 unit -
H.264, HDMI, 4HDD w/o DVD Drive, EMS
cloud systems
### DVR 4ch, CJ-HDR104 1.00 unit -
H.264, HDMI, w/o DVD Drive, EMS cloud
systems
### Hard disk 4TB 4.00 unit -
### Power supply 16ch 3.00 unit -
### Jack BNC drat + pasangan, 98.00 pcs -
### Connector power, 50.00 pcs -

PEKERJAAN INSTALASI
Lantai Basement
### Indoor Camera, IR Fixed 2.0 MP dome analog 3.00 bh -
camere 3,6 mm

### Kabel Coaxial RG 6 / 5C di dalam pipa conduit 3.00 titik -


dia 20 mm
### Stop Kontak + kabel NYM 3 x 2,5 mm di dalam 3.00 titik -
conduit 20 mm

LANTAI 1
### Indoor Camera, IR Fixed 2.0 MP dome analog 8.00 bh -
camere 3,6 mm

### Kabel Coaxial RG 6 / 5C di dalam pipa conduit 8.00 titik -


dia 20 mm
### Stop Kontak + kabel NYM 3 x 2,5 mm di dalam 8.00 titik -
conduit 20 mm

LANTAI 2
Indoor Camera, IR Fixed 2.0 MP dome analog
### camere 3,6 mm 8.00 unit -

### Kabel Coaxial RG 6 / 5C di dalam pipa conduit 8.00 titik -


dia 20 mm
### Stop Kontak + kabel NYM 3 x 2,5 mm di dalam 8.00 titik -
conduit 20 mm

### Testing & Commisioning 1.00 lot -

SUB TOTAL PEKEJAAN CCTV -