REKAPITULASI

RENCANA ANGGARAN BIAYA


PEKERJAAN JARINGAN DISTRIBUSI
UNIVERSITAS ISLAM NEGERI SULTAN MAULANA HASANUDDIN BANTEN
(PROYEK SBSN 6 IN 1)

NO. URAIAN PEKERJAAN JUMLAH HARGA

I. PEKERJAAN UTILITAS ELEKTRIKAL Rp -

II. PEKERJAAN BANGUNAN SUBSTATION (3 UNIT) Rp -

III. PEKERJAAN SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI (SMKK) Rp -

TOTAL Rp -
PPN 11 % Rp -
TOTAL = (JUMLAH + PPN 11%) Rp -
DIBULATKAN Rp -
TERBILANG :

#VALUE!

REKAPITULASI TOTAL
RINCIAN RENCANA ANGGARAN BIAYA
PEMBANGUNAN GEDUNG SUBSTATION DAN INFRASTRUKTUR
PEKERJAAN UTILITAS ELEKTRIKAL
UNIVERSITAS ISLAM NEGERI SULTAN MAULANA HASANUDDIN BANTEN
(PROYEK SBSN 6 IN 1)

HARGA SATUAN JUMLAH HARGA


NO. URAIAN SATUAN VOLUME
(Rp.) (Rp.)
1. 2. 3. 4. 5. 6 = (4. X 5.)

PEKERJAAN UTILITAS ELEKTRIKAL

A PEKERJAAN PANEL UTAMA DAN TRAFO SUBSTATION T-D (TARBIYAH EXISTING)


Pekerjaan termasuk pengadaan dan pemasangan material di
site lengkap dengan accessories, terminasi, grounding, dll
a. Transformator Dry Type Cast Resin Transformer CU Cu set 1.00 - -
250 kVA, 20 kV - 380 Volt lengkap dengan houseng, install, peralatan bantu dan accessories.
b. Cubical TM (MVMDP), terdiri dari : Set 1.00 - -
1 unit, MV Cubicle Incoming, Type IS ( SF6 - LBS )
1 unit, MV Cubicle Outgoing, Type PFA ( SF6 - LBS )
1 unit, MV Cubicle Outgoing, Type PFA ( SF6 - LBS )
c/w 4 buah Fuse 43 Amp
1 buah Shunt Trip 220 VAC
1 unit, MV Cubicle Arester
Accessories :
'- Operating Levers (handle for T1, L1, R1)
'- End wall
'- Switchgear key for low-voltage compartment
'- Operating instructions SIMOSEC, English
c. Panel LVMDP D set 1.00 - -
d. Panel PP/LP-PH.D set 1.00 - -
e. Kabel Ladder Uk. 600x100 m' 28.00 - -
f. Pentanahan Neutral pada Ruang Panel, dll Lot 1.00 - -
g. Dari MVMDP-PH ke Incomming MVMDP-D, N2XSEbY 3x1x120mm2 + Gr m' 105.00 - -
h. Dari MVMDP-A Outgoing ke Transformator A, N2XSY 3x1x70mm2 + Gro m' 3.30 - -
i. Dari Transformator D ke LVMDP D, NYY 2x4(1x150 mm2) + Grounding m' 5.14 - -
j. Dari Panel LVMDP D ke Gedung bangunan, NYY 4x(1x240) mm2 + Gro m' 25.00 - -
k. Dari Panel LVMDP D ke Panel PP/LP-PH.D, NYY 4x6 mm2 + Grounding m' 10.00 - -
B 1. Instalasipenerangan dan daya
1.1 Lampu TL LED 1 x 18 W / TKI bh 4.00 - -
1.2 Stop kontak Daya bh 2.00 - -
1.3 Saklar ganda bh 1.00 - -
Titik Instalasi Penerangan, NYM 3 x 2,5 mm2 titik 4.00 - -
Titik Instalasi Stop Kontak, NYM 3 x 2,5 mm2 titik 1.00 - -
2. Exhaust Fan
2.1 Exhaust Fan tipe Wall, kap. 500 CFm bh 1.00 - -
2.2 Instalasi daya listrik Fan titik 1.00 - -
3. Pemadaman kebakaran
3.1 Fire Extinguisher ( FE ) 6 kG bh 1.00 - -
C 1. Test commisioning ls 1.00 - -
-

A PEKERJAAN PANEL UTAMA DAN TRAFO SUBSTATION T-B (SCIENCE EXISTING)


Pekerjaan termasuk pengadaan dan pemasangan material di
site lengkap dengan accessories, terminasi, grounding, dll
a. Transformator Dry Type Cast Resin Transformer CU Cu set 1.00 - -
250 kVA, 20 kV - 380 Volt lengkap dengan houseng, install, peralatan bantu dan accessories.
b. Cubical TM (MVMDP), terdiri dari : Set 1.00 - -
1 unit, MV Cubicle Incoming, Type IS ( SF6 - LBS )
1 unit, MV Cubicle Outgoing, Type PFA ( SF6 - LBS )
c/w 3 buah Fuse 43 Amp
1 buah Shunt Trip 220 VAC
1 unit, MV Cubicle Arester
Accessories :
'- Operating Levers (handle for T1, L1, R1)
'- End wall
'- Switchgear key for low-voltage compartment
'- Operating instructions SIMOSEC, English
c. Panel LVMDP B set 1.00 - -
d. Panel PP/LP-PH.B set 1.00 - -
e. Kabel Ladder Uk. 600x100 m' 28.00 - -
f. Pentanahan Neutral pada Ruang Panel, dll Lot 1.00 - -
g. Dari MVMDP-D ke Incomming MVMDP-B, N2XSEbY 3x1x120mm2 + Gro m' 95.00 - -
h. Dari MVMDP-B Outgoing ke Transformator B, N2XSY 3x1x70mm2 + Gro m' 3.30 - -
i. Dari Transformator B ke LVMDP B, NYY 2x4(1x150 mm2) + Grounding m' 5.14 - -
j. Dari Panel LVMDP B ke Gedung bangunan, NYY 4x(1x240) mm2 + Grou m' 25.00 - -
k. Dari Panel LVMDP B ke Panel PP/LP-PH.B, NYY 4x6 mm2 + Grounding m' 10.00 - -
B 1. Instalasipenerangan dan daya
1.1 Lampu TL LED 1 x 18 W / TKI bh 4.00 - -
1.2 Stop kontak Daya bh 2.00 - -
1.3 Saklar ganda bh 1.00 - -
Titik Instalasi Penerangan, NYM 3 x 2,5 mm2 titik 4.00 - -
Titik Instalasi Stop Kontak, NYM 3 x 2,5 mm2 titik 1.00 - -
2. Exhaust Fan
2.1 Exhaust Fan tipe Wall, kap. 500 CFm bh 1.00 - -
2.2 Instalasi daya listrik Fan titik 1.00 - -
3. Pemadaman kebakaran
3.1 Fire Extinguisher ( FE ) 6 kG bh 1.00 - -
C 1. Test commisioning ls 1.00 - -
-

A PEKERJAAN PANEL UTAMA DAN TRAFO SUBSTATION T-K (RUSUN)


Pekerjaan termasuk pengadaan dan pemasangan material di
site lengkap dengan accessories, terminasi, grounding, dll
a. Transformator Dry Type Cast Resin Transformer CU Cu set 1.00 - -
400 kVA, 20 kV - 380 Volt lengkap dengan houseng, Install, peralatan bantu dan accessories.
b. Cubical TM (MVMDP), terdiri dari : Set 1.00 - -
1 unit, MV Cubicle Incoming, Type IS ( SF6 - LBS )
1 unit, MV Cubicle Outgoing, Type PFA ( SF6 - LBS )
c/w 3 buah Fuse 43 Amp
1 buah Shunt Trip 220 VAC
1 unit, MV Cubicle Arester
Accessories :
'- Operating Levers (handle for T1, L1, R1)
'- End wall
'- Switchgear key for low-voltage compartment
'- Operating instructions SIMOSEC, English
c. Panel LVMDP K set 1.00 - -
d. Panel PP/LP-PH.K set 1.00 - -
e. Kabel Ladder Uk. 600x100 m' 28.00 - -
f. Pentanahan Neutral pada Ruang Panel, dll Lot 1.00 - -
g. Dari MVMDP-J ke Incomming MVMDP-K, N2XSEbY 3x1x120mm2 + Grou m' 86.00 - -
h. Dari MVMDP-K Outgoing ke Transformator K, N2XSY 3x1x70mm2 + Gro m' 3.30 - -
i. Dari Transformator K ke LVMDP K, NYY 2x4(1x185 mm2) + Grounding m' 5.14 - -
j. Dari Panel LVMDP K ke Gedung bangunan, NYY 4x50 mm2 + Groundin m' 30.00 - -
k. Dari Panel LVMDP K ke Panel PP/LP-PH.K, NYY 4x6 mm2 + Grounding m' 10.00 - -
B 1. Instalasipenerangan dan daya
1.1 Lampu TL LED 1 x 18 W / TKI bh 4.00 - -
1.2 Stop kontak Daya bh 2.00 - -
1.3 Saklar ganda bh 1.00 - -
Titik Instalasi Penerangan, NYM 3 x 2,5 mm2 titik 4.00 - -
Titik Instalasi Stop Kontak, NYM 3 x 2,5 mm2 titik 1.00 - -
2. Exhaust Fan
2.1 Exhaust Fan tipe Wall, kap. 500 CFm bh 1.00 - -
2.2 Instalasi daya listrik Fan titik 1.00 - -
3. Pemadaman kebakaran
3.1 Fire Extinguisher ( FE ) 6 kG bh 1.00 - -
C 1. Test commisioning ls 1.00 - -
-
TOTAL PEKERJAAN UTILITAS ELEKTRIKAL -

PEKERJAAN BANGUNAN SUBSTATION (3 UNIT)

NO. URAIAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA


(Rp.) (Rp.)
1. 2. 3. 4. 5. 6 = (4. X 5.)
PEKERJAAN STANDAR

I. PEKERJAAN PERSIAPAN
1 Pengukuran dan pemasangan bowplank m' 165.60 - -
JUMLAH I.PEKERJAAN PERSIAPAN -

II. PEKERJAAN STRUKTUR


2.1. PEKERJAAN TANAH
a. Galian Tanah m3 74.47 - -
b. Pekerjaan urugan tanah peninggian lantai m3 117.00 - -
c. Urugan Kembali Ex. Galian m3 22.34 - -
d. Pemadatan Tanah CBR 4 + test m2 390.00 - -
e. Pasir Urug Bawah Pondasi dan Lantai t.10 cm m3 39.61 - -
f. Lantai Kerja Bawah Pondasi dan Lantai t.5 cm m3 19.80 - -
JUMLAH 2.1.PEKERJAAN TANAH -

2.2. PEKERJAAN PONDASI


1 Pekerjaan pondasi telapak uk. 150 x 150 x 30 cm
- Besi D 16 Kg 1,751.90 - -
- Begisting Batako m2 21.60 - -
- Cor Beton f'c= 25 Mpa m3 8.78 - -
- Pekerjaan cerucuk dolken kedalaman 2 m m' 216.00 - -

JUMLAH 2.2.PEKERJAAN PONDASI -

2.3. PEKERJAAN STRUKTUR BAWAH


A. PEKERJAAN PILECAP DAN SLOOF
1 TIE BEAM TB.1 (300x600)
- Besi D 16 Kg 878.73 - -
- Besi D 13 Kg 143.23 - -
- Besi D 10 (sengkang) Kg 491.04 - -
- Begisting Batako m2 79.20 - -
- Cor Beton K-300 m3 11.88 - -
2 TIE BEAM TB.2 (250x550) -
- Besi D 16 Kg 329.52 - -
- Besi D 13 Kg 71.61 - -
- Besi D 10 (sengkang) Kg 218.24 - -
- Begisting Batako m2 36.30 - -
- Cor Beton K-300 m3 4.54 - -
JUMLAH 2.3.PEKERJAAN STRUKTUR BAWAH -

2.4. PEKERJAAN STRUKTUR ATAS


A. LANTAI DASAR
1 Plat Lantai SA (t=150mm)
- Besi P10 Dobel Layer Kg 1,519.99 - -
- Begisting dinding Multiplex m2 28.80 - -
- Cor Beton K-300 m3 13.00 - -
2 Kolom Type KP1 (300x300) -
- Besi D 16 Kg 1,007.16 - -
- Besi D 10 (sengkang) Kg 357.12 - -
- Begisting Multiplex m2 86.40 - -
- Cor Beton K-300 m3 6.48 - -
JUMLAH A. LANTAI DASAR -

B. LANTAI DAK
1 Balok Type B1 (250x600)
- Besi D 16 Kg 1,289.74 - -
- Besi D 10 Kg 84.57 - -
- Besi D 10 (sengkang) Kg 627.44 - -
- Begisting Multiplex m2 95.70 - -
- Cor Beton K-300 m3 9.90 - -
2 Balok Type B2 (250x600)
- Besi D 16 Kg 644.87 - -
- Besi D 10 Kg 42.28 - -
- Besi D 10 (sengkang) Kg 313.72 - -
- Begisting Multiplex m2 47.85 - -
- Cor Beton K-300 m3 4.95 - -
3 Plat Lantai SB (t=130mm)
- Besi P8 Dobel Layer Kg 1,869.60 - -
- Begisting Multiplex m2 90.00 - -
- Cor Beton K-300 m3 11.70 - -
JUMLAH B. LANTAI DAK -

III. PEKERJAAN ARSITEK


3.1. PEKERJAAN PASANGAN DAN PELAPIS DINDING
1 Memasang dinding bata ringan 200 x 600 x 100 mm m² 206.86 - -
2 Membuat plesteran semen instan m² 413.71 - -
3 Membuat acian semen instan m² 585.20 - -
4 Opening pintu & jendela m¹ 107.10 - -
5 Kolom praktis 10/10 cm m¹ 129.51 - -
6 Balok praktis 10/15 cm m¹ 141.90 - -
7 Kanopi beton diatas jendela tebal 10 cm m³ 4.46 - -
8 Alumunium grouting di dinding m¹ 126.06 - -
JUMLAH 3.1.PEKERJAAN PASANGAN DAN PELAPIS DINDING -

3.2. PEKERJAAN PASANGAN LANTAI


1 Floor Hardener m² 150.87 - -
2 Waterproofing coating m² 138.15 - -
3 Pasangan screed + kawat ayam m² 93.33 - -
4 Rabat beton m³ 77.31 - -

JUMLAH 3.2.PEKERJAAN PASANGAN LANTAI -

3.3. PEKERJAAN PASANGAN PLAFOND


1 Plafond Exposed m² 122.81 - -
JUMLAH 3.3.PEKERJAAN PASANGAN PLAFOND -

3.4. PEKERJAAN PASANGAN PINTU DAN JENDELA


PINTU BESI TYPE
1 DBS 1 unit 3.00 - -

JENDELA ALUMUNIUM TYPE


1 DW 2 unit 3.00 - -
2 LV 2E unit 6.00 - -
3 LV 4E unit 6.00 - -
JUMLAH 3.4.PEKERJAAN PASANGAN PINTU DAN JENDELA -

3.5. PEKERJAAN PENGECATAN


1 Pengecatan Dinding Weathershield Paint m² 359.22 - -
2 Pengecatan Dinding Dustproof Paint m² 228.89 - -
3 Pengecatan Plafond Dustproof Paint m² 93.44 - -
4 Plint Int Semi - Gloss m' 62.40 - -
JUMLAH 3.5.PEKERJAAN PENGECATAN -

3.6. PEKERJAAN SALURAN KELILING


1 Galian tanah m³ 59.14 - -
2 Memasang dinding bata ringan 200 x 600 x 100 mm m² 147.84 - -
3 Membuat plesteran semen instan m² 348.48 - -
4 Membuat acian semen instan m² 348.48 - -
5 Gravel saluran diameter 40 cm m' 105.60 - -
JUMLAH 3.6.PEKERJAAN SALURAN KELILING -
JUMLAH PEKERJAAN SUBSTATION -
-
PERATURAN UNDANG-UNDANG NO 13 TAHUN 2003 TENTANG KETENAGAKERJAAN

DASAR PERHITUNGAN

PPN 3,600,000,000.00
PATOKAN 0.90909090909 x 3,600,000,000.00 3,272,727,272.73 (NILAI PROYEK DIKALIKAN PPN 11%)
327,272,727.27

RINCIAN PERHITUNGAN BPJS KETENAGAKERJAAN (JKK + JKM) :

PROSENTASE
NILAI PROYEK JKK + JKM NILAI PROYEK NILAI BPJS (JKK+JKM)
100 JUTA 0.24% x 100,000,000.00 240,000.00
400 JUTA 0.19% x 400,000,000.00 760,000.00
500 JUTA - 1 MILYAR 0.15% x 500,000,000.00 750,000.00
1 MILYAR - 5 MILYAR 0.12% x 4,000,000,000.00 4,800,000.00
> 5 MILYAR 0.10% x - 1,727,272,727.27 (1,727,272.73) +
4,822,727.27

71,826,508,000.00
RINCIAN RENCANA ANGGARAN BIAYA
PEMBANGUNAN GEDUNG SUBSTATION DAN INFRASTRUKTUR
(PROYEK SBSN 6 IN 1)

HARGA SATUAN JUMLAH HARGA


NO. URAIAN SATUAN VOLUME
(Rp.) (Rp.)
1. 2. 3. 4. 5. 6 = (4. X 5.)

I. PEKERJAAN SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI (SMKK)


A. Penyiapan RKK : set 1.00 - -
1 Pembuatan dokumen rencana keselamatan kerja
2 Pembuatan prosedur dan instruksi kerja
3 Pengisian formulir
B. Sosialiasasi, promosi dan pelatihan :
1 Induksi K3 (Safety Induction) org 50.00 - -
2 Pengarahan K3 (Safety Briefing) org 50.00 - -
3 Pelatihan K3 :
- P3K org 1.00 - -
- Bekerja di ketinggian org 20.00 - -
- Simulasi K3 org 30.00 - -
- Spanduk (Banner) Lb 5.00 - -
- Poster Lb 5.00 - -
- Papan Informasi K3 Bh 2.00 - -
C. Alat Pelindung Kerja dan Alat Pelindung Diri :
1 APK antara lain :
- Jaring Pengaman (Safety Net) m² 794.79 - -
- Tali Keselamatan (Life Line) ls 1.00 - -
- Penahan Jatuh (Safety Deck) ls 1.00 - -
- Pembatas Area (Restricted Area) ls 1.00 - -
- Rambu informasi bh 5.00 - -
- Jalur evakuasi (Escape Route) ls 1.00 - -
2 APD antara lain :
- Topi pelindung (Safety Helmet) bh 50.00 - -
- Pelindung Mata (Googles, Spectacles) Psg 40.00 - -
- Tameng Muka (Face shield) bh 5.00 - -
- Pelindung pernapasan dan mulut (Masker) box 40.00 - -
- Sarung Tangan (Safety Gloves) Psg 300.00 - -
- Sepatu Keselamatan (Safety boot) Psg 50.00 - -
- Sepatu Keselamatan (Safety Shoes) Psg 10.00 - -
- Penunjang Seluruh Tubuh (Full Body Harmess) Bh 10.00 - -
- Rompi Keselamatan (Safety Vest) Bh 50.00 - -
3 Pengadaan Sarana Pencegahan Covid 19 :
- Masker bh 7,500.00 - -
- Handsanitizer 5 liter bh 5.00 - -
- Cairan Disinfektan 5 liter bh 5.00 - -
- Sabun Cuci Tangan 5 liter bh 10.00 - -
- Termogun (Alat Pengukur Suhu Badan) bh 2.00 - -
- Wastafel gantung + kran lengkap dengan aksesoris bh 3.00 - -
- Alat Semprot Disinfektan bh 1.00 - -
D. Asuransi dan Perizinan
1 Asuransi tenaga kerja ls 1.00 - -
2 Surat pengesahan organisasi K3 menjadi tanggung jawab pelaksana
(P2K3, sesuai dengan ketentuan peraturan perundang-undangan)
E. Personel K3 Konstruksi
1 Ahli Muda K3 Konstruksi OB 1.00 - -
2 Petugas K3 OB 1.00 - -
3 Petugas pengatur lalu lintas (Flagman) OB 2.00 - -
F. Fasilitas, sarana dan prasarana kesehatan :
1 Peralatan P3K Lengkap (Kotak P3K, Tandu, Obat Luka, Perban, dll) ls 1.00 - -
G. Rambu-Rambu yang diperlukan :
1 Rambu petunjuk bh 10.00 - -
2 Rambu larangan bh 10.00 - -
3 Rambu informasi bh 10.00 - -
4 Rambu pekerjaan sementara bh 10.00 - -
5 Jalur evakuasi (escape route) ls 1.00 - -
6 Tongkat pengatur lalu lintas (warning lights sticks) bh 2.00 - -
H. Konsultasi dengan Ahli terkait Keselamatan Konstruksi :
1 Ahli Struktur OJ - - -
I. Lain-Lain Terkait Pengendalian Risiko Keselamatan Konstruksi :
1 Alat pemadam api ringan (APAR) bh 5.00 - -
2 Bendera K3 bh 2.00 - -
3 Program Inspeksi dan Audit Internal ls 1.00 - -
4 Pelaporan dan Penyelidikan Insiden ls 1.00 - -
JUMLAH I.PEKERJAAN SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI (SMKK) Rp -

Pekerjaan Sistem Manajemen Keselamatan Konstruksi - page 10 of 40


BREAKDOWN COST

PROJECT :
LOCATION :

SUB DIVISION : ELECTRICAL

UNIT PRICE TOTAL PRICE


NO / CODE DESCRIPTION REFERENCE QUANTITY UNIT
(RP) (RP)

P PANEL

I SUB STATION
1 LVMDP-D CAKRA RAYA TEK.
a Material/Components :
- Cubicle complete with components CRT 1.000 unit 0.00 0.00
- Base/Foundation 1.00 ls - 0.00
0.00
b Transportation
- From Jakarta 1.152 m3 0.00 0.00
0.00

c Insurance - % 0.00
0.00
d Fixing Cost :
- Foreman 0.120 man/day 0.00 0.00
- Chief Electrician 0.400 man/day 0.00 0.00
- Electrician 4.000 man/day 0.00 0.00
- Labour 8.000 man/day 0.00 0.00
0.00

Sub Total 0.00


e Profit & Overhead 10.000 % 0.00
Total 0.00
Rounded 0.00

2 LVMDP-K CAKRA RAYA TEK.


a Material/Components :
- Cubicle complete with components CRT 1.00 unit 0.00 0.00
- Base/Foundation 1.00 ls - 0.00
0.00
b Transportation
- From Jakarta 1.152 m3 0.00 0.00
0.00

c Insurance - % 0.00
0.00
d Fixing Cost :
- Foreman 0.120 man/day 0.00 0.00
- Chief Electrician 0.400 man/day 0.00 0.00
- Electrician 4.000 man/day 0.00 0.00
- Labour 8.000 man/day 0.00 0.00
0.00

Sub Total 0.00


e Profit & Overhead 10.000 % 0.00
Total 0.00
Rounded 0.00

3 LVMDP-B CAKRA RAYA TEK.


a Material/Components :
- Cubicle complete with components CRT 1.000 set 0.00 0.00
- Base/Foundation 1.000 ls - 0.00
0.00
b Transportation
- From Jakarta 0.110 m3 0.00 0.00
0.00

c Insurance - % 0.00
0.00
d Fixing Cost :

lv-paneln(ELEC) Page : 11 of 40
UNIT PRICE TOTAL PRICE
NO / CODE DESCRIPTION REFERENCE QUANTITY UNIT
(RP) (RP)
- Foreman 0.060 man/day 0.00 0.00
- Chief Electrician 0.200 man/day 0.00 0.00
- Electrician 2.000 man/day 0.00 0.00
- Labour 4.000 man/day 0.00 0.00
0.00

Sub Total 0.00


e Profit & Overhead 10.000 % 0.00
Total 0.00
Rounded 0.00

4 PP/LP-PH.B
a Material/Components :
- Cubicle complete with components CRT 1.000 set 0.00 0.00
- Base/Foundation 1.000 ls - 0.00
0.00
b Transportation
- From Jakarta 0.110 m3 0.00 0.00
0.00

c Insurance - % 0.00
0.00
d Fixing Cost :
- Foreman 0.060 man/day 0.00 0.00
- Chief Electrician 0.200 man/day 0.00 0.00
- Electrician 2.000 man/day 0.00 0.00
- Labour 4.000 man/day 0.00 0.00
0.00

Sub Total 0.00


e Profit & Overhead 10.000 % 0.00
Total 0.00
Rounded 0.00

5 PP/LP-PH.D
a Material/Components :
- Cubicle complete with components CRT 1.000 set 0.00 0.00
- Base/Foundation 1.000 ls - 0.00
0.00
b Transportation
- From Jakarta 0.110 m3 0.00 0.00
0.00

c Insurance - % 0.00
0.00
d Fixing Cost :
- Foreman 0.060 man/day 0.00 0.00
- Chief Electrician 0.200 man/day 0.00 0.00
- Electrician 2.000 man/day 0.00 0.00
- Labour 4.000 man/day 0.00 0.00
0.00

Sub Total 0.00


e Profit & Overhead 10.000 % 0.00
Total 0.00
Rounded 0.00

6 PP/LP-PH.K
a Material/Components :
- Cubicle complete with components CRT 1.000 set 0.00 0.00
- Base/Foundation 1.000 ls - 0.00
0.00
b Transportation
- From Jakarta 0.110 m3 0.00 0.00
0.00

c Insurance - % 0.00
0.00
d Fixing Cost :
- Foreman 0.060 man/day 0.00 0.00
- Chief Electrician 0.200 man/day 0.00 0.00

lv-paneln(ELEC) Page : 12 of 40
UNIT PRICE TOTAL PRICE
NO / CODE DESCRIPTION REFERENCE QUANTITY UNIT
(RP) (RP)
- Electrician 2.000 man/day 0.00 0.00
- Labour 4.000 man/day 0.00 0.00
0.00

Sub Total 0.00


e Profit & Overhead 10.000 % 0.00
Total 0.00
Rounded 0.00

lv-paneln(ELEC) Page : 13 of 40
BREAKDOWN COST
PROJECT :
LOCATION :

SUB DIVISION : ELECTRICAL

NO / UNIT PRICE TOTAL PRICE


DESCRIPTION REFERENCE QUANTITY UNIT
CODE (RP) (RP)

MV MV CUBICLE

I SUB STATION
MVMDP - K
1 Panel MVMDP-K ABB
a Material/Components :
- Panel MVMDP-K 1.000 set 0.00 0.00
- Base/Foundation 1.00 ls 0.00 0.00
0.00
b Transportation
- From Jakarta 1.152 m3 0.00 0.00
0.00

c Insurance - % 0.00
0.00
d Fixing Cost :
- Foreman 1.200 man/day 0.00 0.00
- Chief Electrician 4.000 man/day 0.00 0.00
- Electrician 2.000 man/day 0.00 0.00
- Labour 8.000 man/day 0.00 0.00
0.00

Sub Total 0.00


e Profit & Overhead 10.000 % 0.00
Total 0.00
Rounded 0.00

2 MVMDP - B ABB
Panel MVMDP-B
a Material/Components :
- MVMDP - B 1.000 set 0.00 0.00
- Base/Foundation 1.000 ls 0.00 0.00
0.00
b Transportation
- From Jakarta 0.110 m3 0.00 0.00
0.00

c Insurance - % 0.00
0.00
d Fixing Cost :
- Foreman 1.200 man/day 0.00 0.00
- Chief Electrician 4.000 man/day 0.00 0.00
- Electrician 2.000 man/day 0.00 0.00
- Labour 8.000 man/day 0.00 0.00
0.00

Sub Total 0.00


e Profit & Overhead 10.000 % 0.00
Total 0.00
Rounded 0.00

3 MVMDP - D ABB
Panel MVMDP-D
a Material/Components :
- MVMDP - D 1.000 set 0.00 0.00
- Base/Foundation 1.000 ls 0.00 0.00

MV CUBICLE (ELEC) Page : 14 of 40


NO / UNIT PRICE TOTAL PRICE
DESCRIPTION REFERENCE QUANTITY UNIT
CODE (RP) (RP)
0.00
b Transportation
- From Jakarta 0.110 m3 0.00 0.00
0.00

c Insurance - % 0.00
0.00
d Fixing Cost :
- Foreman 1.200 man/day 0.00 0.00
- Chief Electrician 4.000 man/day 0.00 0.00
- Electrician 2.000 man/day 0.00 0.00
- Labour 8.000 man/day 0.00 0.00
0.00

Sub Total 0.00


e Profit & Overhead 10.000 % 0.00
Total 0.00
Rounded 0.00
II. TRANSFORMER
1 Transformator Dry Type Cast Resin Transformer CU Cu, 400 kVA, 20 kV - 380 Volt lengkap dengan houseng, Install, peralatan bantu, dan accessories.
a Material/Components :
- Transformator Dry Type Cast Resin Transformer CU 1.000 set - 0.00
- Base/Foundation 1.000 ls 0.00 0.00
0.00
b Transportation
- From Jakarta 0.048 m3 0.00 0.00
0.00

c Insurance - % 0.00
0.00
d Fixing Cost :
- Foreman 1.200 man/day 0.00 0.00
- Chief Electrician 4.000 man/day 0.00 0.00
- Electrician 2.000 man/day 0.00 0.00
- Labour 8.000 man/day 0.00 0.00
0.00

Sub Total 0.00


e Profit & Overhead 10.000 % 0.00
Total 0.00
Rounded 0.00

1 Transformator Dry Type Cast Resin Transformer CU Cu, 250 kVA, 20 kV - 380 Volt lengkap dengan houseng, Install, peralatan bantu, dan accessories.
a Material/Components :
- Transformator Dry Type Cast Resin Transformer CU 1.000 set - 0.00
- Base/Foundation 1.000 ls 0.00 0.00
0.00
b Transportation
- From Jakarta 0.048 m3 0.00 0.00
0.00

c Insurance - % 0.00
0.00
d Fixing Cost :
- Foreman 0.050 man/day 0.00 0.00
- Chief Electrician 0.500 man/day 0.00 0.00
- Electrician 1.000 man/day 0.00 0.00
- Labour 2.000 man/day 0.00 0.00
0.00

Sub Total 0.00


e Profit & Overhead 10.000 % 0.00
Total 0.00
Rounded 0.00

MV CUBICLE (ELEC) Page : 15 of 40


BREAKDOWN COST
PROJECT :
LOCATION :

SUB DIVISION :

Unit Price
No./Code Description Reference Quantity Unit
(Rp.)

R Raceway
R.I Ladder Type SLW
R.I.3 Lader 600x100 mm & Fittings DS TRAY
R.I.3.1 Straight Ladder
a Material :
- Straight Ladder 1.00 meter 0.00

b Transportation
From Jakarta 8.95 kg

c Insurance - %

d Fixing Cost :
- Foreman 0.02 man/day 0.00
- Chief Electrician 0.02 man/day 0.00
- Electrician 0.19 man/day 0.00
- Worker 0.38 man/day 0.00

Sub Total
e Profit & Overhead 10.00 %
Total
Rounded
TOTAL PRICE
(Rp.)

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
BREAKDOWN COST
PROJECT :
LOCATION :

SUB DIVISIO :

NO / CODE DESCRIPTION REFERENCE Quantity Unit Unit Price TOTAL PRICE


DAFTAR HARGA BAHAN DAN UPAH ELEKTRIKAL
PEMBANGUNAN GEDUNG KULIAH DAN INFRASTRUKTUR
UNIVERSITAS ISLAM NEGERI SULTAN MAULANA HASANUDDIN BANTEN

NO URAIAN HARGA SATUAN

A. DAFTAR UPAH
1 Pekerja Rp - hari
2 Tukang pipa Rp - hari
3 Tukang listrik Rp - hari
4 Tukang AC Rp - hari
5 Kepala tukang AC Rp - hari
6 Kepala tukang listrik Rp - hari
7 Kepala tukang pipa Rp - hari
8 Mandor Rp - hari

PEKERJAAN ELEKTRIKAL

Bahan Elektikal - page 19 of 40


NO URAIAN HARGA SATUAN

B. PEKERJAAN KABEL
1 Kabel N2XSEbY 3 x 150 mm2 Rp - m¹
2 Kabel N2XSY 1 x 70 mm2 Rp - m¹
3 Kabel NYA 1 x 5 mm2 Rp - m'
4 Kabel NYA 1 x 25 mm2 Rp - m'
5 Kabel NYA 1 x 120 mm2 Rp - m'
6 Kabel NYM 3 x 2,5 mm2 Rp - m'
7 Kabel NYM 3 x 4 mm2 Rp - m'
8 Kabel NYY 1 x 185 mm2 Rp - m'
9 Kabel NYY 1 x 240 mm2 Rp - m'
10 Kabel NYY 1 x 150 mm2 Rp - m'
11 Kabel NYY 2 x 1,5 mm2 Rp - m'
12 Kabel NYY 4 x 6 mm2 Rp - m'
13 Kabel NYY 4 x 50 mm2 Rp - m'
18 Galian, Urugan & Pelindung kabel/Sparing Rp - m'

C. PEKERJAAN STOP KONTAK & SAKLAR


1 Socket Pipa Rp - bh
2 Tee Doos Rp - bh
3 Pipa Conduit Rp - m'
4 Las Dop Rp - bh
5 Klem Pipa Rp - bh
6 Fhiser Rp - bh
7 Isolasi Ban Rp - bh

Bahan Elektikal - page 20 of 40


ANALISA HARGA SATUAN PEKERJAAN ELEKTRIKAL
PEMBANGUNAN GEDUNG KULIAH DAN INFRASTRUKTUR
UNIVERSITAS ISLAM NEGERI SULTAN MAULANA HASANUDDIN BANTEN

NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH HARGA TOTAL HARGA

1 LOT BIAYA PENYAMBUNGAN PLN 4019,93 KVA Rp -


1 Biaya Penyambungan (BP) KVA 4019.9300 Rp - Rp - EFEKTIF BEKE
2 Uang Jaminal Langganan (UJL), SLO, JIL lot 1.0000 Rp - Rp - ###
3 Bea Materai bh 1.0000 Rp - Rp - ###
4 Tenaga Kerja : RUMUS :
Pekerja hari orang 0.0432 Rp - Rp -
Tukang Listrik hari orang 0.0864 Rp - Rp - Pekerja
Kepala Tukang listrik hari orang 0.0086 Rp - Rp - Tukang
Mandor hari orang 0.0043 Rp - Rp - Kepala tukan
Jumlah Rp - Mandor
Keuntungan 10% Rp -
Total = Jumlah+(Keuntungan 10%) Rp -
1 M' Kabel TM N2XSY 3 x 1 x 70 mm2 + Grounding Rp -
1 Kabel N2XSY 1 x 70 mm2 M' 3.0000 Rp - Rp - EFEKTIF BEKE
2 NYA 1 x 120 mm2 (grounding) M' 3.0000 Rp - Rp - ###
3 Galian, Urugan & Pelindung kabel/Sparing M' 3.0000 Rp - Rp - ###
4 Alat Bantu Penunjang lot 1.0000 Rp - Rp - ###
5 Tenaga Kerja : RUMUS :
Pekerja hari orang 0.0288 Rp - Rp -
Tukang Listrik hari orang 0.0576 Rp - Rp - Pekerja
Kepala Tukang listrik hari orang 0.0058 Rp - Rp - Tukang
Mandor hari orang 0.0029 Rp - Rp - Kepala tukan
Jumlah Rp - Mandor
Keuntungan 10% Rp -
Total = Jumlah+(Keuntungan 10%) Rp -
1 M' Kabel TM N2XSEbY 3 x 1 x 120 mm2 + Grounding Rp -
1 Kabel N2XSEbY 3 x 120 mm2 M' 1.0000 Rp - Rp - EFEKTIF BEKE
2 NYA 1 x 120 mm2 (grounding) M' 1.0000 Rp - Rp - ###
3 Galian, Urugan & Pelindung kabel/Sparing M' 1.0000 Rp - Rp - RUMUS :
4 Alat Bantu Penunjang lot 1.0000 Rp - Rp - ###
5 Tenaga Kerja : RUMUS :
Pekerja hari orang 0.0288 Rp - Rp -
Tukang Listrik hari orang 0.0576 Rp - Rp - Pekerja
Kepala Tukang listrik hari orang 0.0058 Rp - Rp - Tukang
Mandor hari orang 0.0029 Rp - Rp - Kepala tukan
Jumlah Rp - Mandor
Keuntungan 10% Rp -
Total = Jumlah+(Keuntungan 10%) Rp -
1 M' Kabel TM N2XSEbY 4 x 1 x 120 mm2 + Grounding Rp -
1 Kabel N2XSEbY 4 x 1 x 120 mm2 M' 1.0000 Rp - Rp - EFEKTIF BEKE
2 NYA 1 x 120 mm2 (grounding) M' 1.0000 Rp - Rp - ###
3 Galian, Urugan & Pelindung kabel/Sparing M' 1.0000 Rp - Rp - RUMUS :
4 Alat Bantu Penunjang lot 1.0000 Rp - Rp - ###
5 Tenaga Kerja : RUMUS :
Pekerja hari orang 0.0288 Rp - Rp -
Tukang Listrik hari orang 0.0576 Rp - Rp - Pekerja
Kepala Tukang listrik hari orang 0.0058 Rp - Rp - Tukang
Mandor hari orang 0.0029 Rp - Rp - Kepala tukan
Jumlah Rp - Mandor
Keuntungan 10% Rp -
Total = Jumlah+(Keuntungan 10%) Rp -
1 M' KABEL TR NYM 3 x 2,5 mm2 + Grounding Rp -
1 Kabel NYM 3 x 2,5 mm2 M' 1.0000 Rp - Rp - EFEKTIF BEKE
2 Kabel NYA 1 x 5 mm2 M' 1.0000 Rp - Rp - ###
3 Alat Bantu Penunjang lot 1.0000 Rp - Rp - ###
4 Tenaga Kerja : RUMUS :
Pekerja hari orang 0.0288 Rp - Rp -
Tukang Listrik hari orang 0.0576 Rp - Rp - Pekerja
Kepala Tukang listrik hari orang 0.0058 Rp - Rp - Tukang
Mandor hari orang 0.0029 Rp - Rp - Kepala tukan
Jumlah Rp - Mandor
Keuntungan 10% Rp -
Total = Jumlah+(Keuntungan 10%) Rp -
1 M' KABEL TR, NYY 4 x 6 mm2 + Grounding Rp -
1 Kabel NYY 4x6 mm2 M' 1.0000 Rp - Rp - EFEKTIF BEKE
2 Kabel NYA 1 x 5 mm2 M' 1.0000 Rp - Rp - ###
3 Alat Bantu Penunjang lot 1.0000 Rp - Rp - ###
4 Tenaga Kerja : RUMUS :
Pekerja hari orang 0.0288 Rp - Rp -
Tukang Listrik hari orang 0.0576 Rp - Rp - Pekerja
Kepala Tukang listrik hari orang 0.0058 Rp - Rp - Tukang
Mandor hari orang 0.0029 Rp - Rp - Kepala tukan
Jumlah Rp - Mandor
Keuntungan 10% Rp -
Total = Jumlah+(Keuntungan 10%) Rp -
1 M' KABEL TR, NYY 4 x 50 mm2 + Grounding Rp -
1 Kabel NYY 4 x 50 mm2 M' 1.0000 Rp - Rp - EFEKTIF BEKE
2 Kabel NYA 1 x 25 mm2 M' 1.0000 Rp - Rp - ###
3 Alat Bantu Penunjang lot 1.0000 Rp - Rp - ###
4 Tenaga Kerja : RUMUS :
Pekerja hari orang 0.0288 Rp - Rp -
Tukang Listrik hari orang 0.0576 Rp - Rp - Pekerja
Kepala Tukang listrik hari orang 0.0058 Rp - Rp - Tukang
Mandor hari orang 0.0029 Rp - Rp - Kepala tukan
Jumlah Rp - Mandor
Keuntungan 10% Rp -
Total = Jumlah+(Keuntungan 10%) Rp -

1 M' KABEL TR, NYY 4 x (4 x 185 mm2) + Grounding Rp -


1 Kabel NYY 4 x 185 mm2 M' 4.0000 Rp - Rp - EFEKTIF BEKE
2 Kabel NYA 1 x 120 mm2 (Grounding) M' 4.0000 Rp - Rp - ###
3 Alat Bantu Penunjang lot 1.0000 Rp - Rp - ###
4 Tenaga Kerja : RUMUS :
Pekerja hari orang 0.0288 Rp - Rp -
Tukang Listrik hari orang 0.0576 Rp - Rp - Pekerja
Kepala Tukang listrik hari orang 0.0058 Rp - Rp - Tukang
Mandor hari orang 0.0029 Rp - Rp - Kepala tukan
Jumlah Rp - Mandor
Keuntungan 10% Rp -
Total = Jumlah+(Keuntungan 10%) Rp -
1 M' KABEL TR, NYY 2 x 4 (1 x 150 mm2) + Grounding Rp -
Analisa Harga Satuan Elektrikal - page 21 of 40
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH HARGA TOTAL HARGA
1 Kabel NYY 1 x 150 mm2 M' 8.0000 Rp - Rp - EFEKTIF BEKE
2 Kabel NYA 1 x 120 mm2 (Grounding) M' 8.0000 Rp - Rp - ###
3 Alat Bantu Penunjang lot 1.0000 Rp - Rp - ###
4 Tenaga Kerja : RUMUS :
Pekerja hari orang 0.0288 Rp - Rp -
Tukang Listrik hari orang 0.0576 Rp - Rp - Pekerja
Kepala Tukang listrik hari orang 0.0058 Rp - Rp - Tukang
Mandor hari orang 0.0029 Rp - Rp - Kepala tukan
Jumlah Rp - Mandor
Keuntungan 10% Rp -
Total = Jumlah+(Keuntungan 10%) Rp -

1 M' KABEL TR, NYY 12 x (1 x 150) mm2 + Grounding Rp -


1 Kabel NYY 1 x 150 mm2 M' 12.0000 Rp - Rp - EFEKTIF BEKE
2 Kabel NYA 1 x 120 mm2 (Grounding) M' 12.0000 Rp - Rp - ###
3 Alat Bantu Penunjang lot 1.0000 Rp - Rp - ###
4 Tenaga Kerja : RUMUS :
Pekerja hari orang 0.0288 Rp - Rp -
Tukang Listrik hari orang 0.0576 Rp - Rp - Pekerja
Kepala Tukang listrik hari orang 0.0058 Rp - Rp - Tukang
Mandor hari orang 0.0029 Rp - Rp - Kepala tukan
Jumlah Rp - Mandor
Keuntungan 10% Rp -
Total = Jumlah+(Keuntungan 10%) Rp -

1 M' KABEL TR, NYY 4 x (1 x 240) mm2 + Grounding Rp -


1 Kabel NYY 1 x 240 mm2 M' 4.0000 Rp - Rp - EFEKTIF BEKE
2 Kabel NYA 1 x 120 mm2 (Grounding) M' 4.0000 Rp - Rp - ###
3 Alat Bantu Penunjang lot 1.0000 Rp - Rp - ###
4 Tenaga Kerja : RUMUS :
Pekerja hari orang 0.0288 Rp - Rp -
Tukang Listrik hari orang 0.0576 Rp - Rp - Pekerja
Kepala Tukang listrik hari orang 0.0058 Rp - Rp - Tukang
Mandor hari orang 0.0029 Rp - Rp - Kepala tukan
Jumlah Rp - Mandor
Keuntungan 10% Rp -
Total = Jumlah+(Keuntungan 10%) Rp -

1 M' KABEL TR, NYY 2 x 4 ( 1x 185) mm2 + Grounding Rp -


1 Kabel NYY 1 x 185 mm2 M' 8.0000 Rp - Rp - EFEKTIF BEKE
2 Kabel NYA 1 x 120 mm2 (Grounding) M' 8.0000 Rp - Rp - ###
3 Alat Bantu Penunjang lot 1.0000 Rp - Rp - ###
4 Tenaga Kerja : RUMUS :
Pekerja hari orang 0.0288 Rp - Rp -
Tukang Listrik hari orang 0.0576 Rp - Rp - Pekerja
Kepala Tukang listrik hari orang 0.0058 Rp - Rp - Tukang
Mandor hari orang 0.0029 Rp - Rp - Kepala tukan
Jumlah Rp - Mandor
Keuntungan 10% Rp -
Total = Jumlah+(Keuntungan 10%) Rp -

1 TITIK TITIK INSTALLASI PENERANGAN DALAM Rp -


1 Kabel NYM 3 x 2,5 mm2 M' 10.0000 Rp - Rp - EFEKTIF BEKE
2 Pipa Conduit M' 10.0000 Rp - Rp - ###
3 Socket Pipa bh 6.0000 Rp - Rp - ###
4 Tee Doos bh 5.0000 Rp - Rp - RUMUS :
5 Klem Pipa bh 3.0000 Rp - Rp -
6 Fhiser bh 6.0000 Rp - Rp - Pekerja
7 Las Doop bh 2.0000 Rp - Rp - Tukang
8 Isolasi ban bh 0.2500 Rp - Rp - Kepala tukan
9 Tenaga Kerja : Mandor
Pekerja hari orang 0.0216 Rp - Rp -
Tukang Listrik hari orang 0.0432 Rp - Rp -
Kepala Tukang listrik hari orang 0.0043 Rp - Rp -
Mandor hari orang 0.0022 Rp - Rp -
Jumlah Rp -
Keuntungan 10% Rp -
Total = Jumlah+(Keuntungan 10%) Rp -

1 TITIK TITIK INSTALLASI STOP KONTAK 1 PH Rp -


1 Kabel NYM 3 x 2,5 mm2 M' 10.0000 Rp - Rp - EFEKTIF BEKE
2 Pipa Conduit M' 10.0000 Rp - Rp - ###
3 Socket Pipa bh 5.0000 Rp - Rp - ###
4 Tee Doos bh 5.0000 Rp - Rp - RUMUS :
5 Klem Pipa bh 5.0000 Rp - Rp -
6 Fhiser bh 5.0000 Rp - Rp - Pekerja
7 Las Doop bh 3.0000 Rp - Rp - Tukang
8 Isolasi ban bh 0.2500 Rp - Rp - Kepala tukan
9 Tenaga Kerja : Mandor
Pekerja hari orang 0.0216 Rp - Rp -
Tukang Listrik hari orang 0.0432 Rp - Rp -
Kepala Tukang listrik hari orang 0.0043 Rp - Rp -
Mandor hari orang 0.0022 Rp - Rp -
Jumlah Rp -
Keuntungan 10% Rp -
Total = Jumlah+(Keuntungan 10%) Rp -

1 TITIK TITIK INSTALLASI DAYA FAN/ExHAUST (NYM 3 x 2,5 mm) Rp -


1 Kabel NYM 3 x 2,5 mm2 M' 10.0000 Rp - Rp - EFEKTIF BEKE
2 Pipa Conduit M' 10.0000 Rp - Rp - ###
3 Socket Pipa bh 5.0000 Rp - Rp - ###
4 Tee Doos bh 5.0000 Rp - Rp - RUMUS :
5 Klem Pipa bh 5.0000 Rp - Rp -
6 Fhiser bh 5.0000 Rp - Rp - Pekerja
7 Las Doop bh 3.0000 Rp - Rp - Tukang
8 Isolasi ban bh 0.2500 Rp - Rp - Kepala tukan
9 Tenaga Kerja : Mandor
Pekerja hari orang 0.0432 Rp - Rp -
Tukang Listrik hari orang 0.0864 Rp - Rp -
Kepala Tukang listrik hari orang 0.0086 Rp - Rp -
Mandor hari orang 0.0043 Rp - Rp -
Jumlah Rp -
Keuntungan 10% Rp -
Total = Jumlah+(Keuntungan 10%) Rp -

1 TITIK TITIK INSTALLASI DAYA FAN/ExHAUST (NYM 3 x 4 mm) Rp -


1 Kabel NYM 3 x 4 mm2 M' 10.0000 Rp - Rp - EFEKTIF BEKE
2 Pipa Conduit M' 10.0000 Rp - Rp - ###
3 Socket Pipa bh 5.0000 Rp - Rp - ###
Analisa Harga Satuan Elektrikal - page 22 of 40
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH HARGA TOTAL HARGA
4 Tee Doos bh 5.0000 Rp - Rp - RUMUS :
5 Klem Pipa bh 5.0000 Rp - Rp -
6 Fhiser bh 5.0000 Rp - Rp - Pekerja
7 Las Doop bh 3.0000 Rp - Rp - Tukang
8 Isolasi ban bh 0.2500 Rp - Rp - Kepala tukan
9 Tenaga Kerja : Mandor
Pekerja hari orang 0.0432 Rp - Rp -
Tukang Listrik hari orang 0.0864 Rp - Rp -
Kepala Tukang listrik hari orang 0.0086 Rp - Rp -
Mandor hari orang 0.0043 Rp - Rp -
Jumlah Rp -
Keuntungan 10% Rp -
Total = Jumlah+(Keuntungan 10%) Rp -

1 TITIK TITIK INSTALLASI DAYA POMPA (NYY 4 x 6 mm) Rp -


1 Kabel NYY 4 x 6 mm2 M' 10.0000 Rp - Rp - EFEKTIF BEKE
2 Pipa Conduit M' 10.0000 Rp - Rp - ###
3 Socket Pipa bh 5.0000 Rp - Rp - ###
4 Tee Doos bh 5.0000 Rp - Rp - RUMUS :
5 Klem Pipa bh 5.0000 Rp - Rp -
6 Fhiser bh 5.0000 Rp - Rp - Pekerja
7 Las Doop bh 3.0000 Rp - Rp - Tukang
8 Isolasi ban bh 0.2500 Rp - Rp - Kepala tukan
9 Tenaga Kerja : Mandor
Pekerja hari orang 0.0432 Rp - Rp -
Tukang Listrik hari orang 0.0864 Rp - Rp -
Kepala Tukang listrik hari orang 0.0086 Rp - Rp -
Mandor hari orang 0.0043 Rp - Rp -
Jumlah Rp -
Keuntungan 10% Rp -
Total = Jumlah+(Keuntungan 10%) Rp -

1 TITIK TITIK INSTALLASI DAYA AC INDOOR (NYM 3 x 2,5 mm) Rp -


1 Kabel NYM 3 x 2,5 mm2 M' 10.0000 Rp - Rp - EFEKTIF BEKE
2 Pipa Conduit M' 10.0000 Rp - Rp - ###
3 Socket Pipa bh 5.0000 Rp - Rp - ###
4 Tee Doos bh 5.0000 Rp - Rp - RUMUS :
5 Klem Pipa bh 5.0000 Rp - Rp -
6 Fhiser bh 5.0000 Rp - Rp - Pekerja
7 Las Doop bh 3.0000 Rp - Rp - Tukang
8 Isolasi ban bh 0.2500 Rp - Rp - Kepala tukan
9 Tenaga Kerja : Mandor
Pekerja hari orang 0.0288 Rp - Rp -
Tukang Listrik hari orang 0.0576 Rp - Rp -
Kepala Tukang listrik hari orang 0.0058 Rp - Rp -
Mandor hari orang 0.0029 Rp - Rp -
Jumlah Rp -
Keuntungan 10% Rp -
Total = Jumlah+(Keuntungan 10%) Rp -

1 TITIK TITIK INSTALLASI DAYA AC INDOOR (NYM 3 x 4 mm) Rp -


1 Kabel NYM 3 x 4 mm2 M' 10.0000 Rp - Rp - EFEKTIF BEKE
2 Pipa Conduit M' 10.0000 Rp - Rp - ###
3 Socket Pipa bh 5.0000 Rp - Rp - ###
4 Tee Doos bh 5.0000 Rp - Rp - RUMUS :
5 Klem Pipa bh 5.0000 Rp - Rp -
6 Fhiser bh 5.0000 Rp - Rp - Pekerja
7 Las Doop bh 3.0000 Rp - Rp - Tukang
8 Isolasi ban bh 0.2500 Rp - Rp - Kepala tukan
9 Tenaga Kerja : Mandor
Pekerja hari orang 0.0288 Rp - Rp -
Tukang Listrik hari orang 0.0576 Rp - Rp -
Kepala Tukang listrik hari orang 0.0058 Rp - Rp -
Mandor hari orang 0.0029 Rp - Rp -
Jumlah Rp -
Keuntungan 10% Rp -
Total = Jumlah+(Keuntungan 10%) Rp -

1 TITIK TITIK INSTALLASI DAYA AC OUTDOOR (NYY 4 x 50 mm) Rp -


1 Kabel NYY 4 x 50 mm2 M' 5.0000 Rp - Rp - EFEKTIF BEKE
2 Pipa Conduit M' 5.0000 Rp - Rp - ###
3 Socket Pipa bh 5.0000 Rp - Rp - ###
4 Tee Doos bh 5.0000 Rp - Rp - RUMUS :
5 Klem Pipa bh 5.0000 Rp - Rp -
6 Fhiser bh 5.0000 Rp - Rp - Pekerja
7 Las Doop bh 3.0000 Rp - Rp - Tukang
8 Isolasi ban bh 0.2500 Rp - Rp - Kepala tukan
9 Tenaga Kerja : Mandor
Pekerja hari orang 0.0432 Rp - Rp -
Tukang Listrik hari orang 0.0864 Rp - Rp -
Kepala Tukang listrik hari orang 0.0086 Rp - Rp -
Mandor hari orang 0.0043 Rp - Rp -
Jumlah Rp -
Keuntungan 10% Rp -
Total = Jumlah+(Keuntungan 10%) Rp -
1 TITIK TITIK INSTALLASI DAYA LIFT (NYY 4 x 6 mm) Rp -
1 Kabel NYY 4 x 6 mm2 M' 10.0000 Rp - Rp - EFEKTIF BEKE
2 Pipa Conduit M' 10.0000 Rp - Rp - ###
3 Socket Pipa bh 5.0000 Rp - Rp - ###
4 Tee Doos bh 5.0000 Rp - Rp - RUMUS :
5 Klem Pipa bh 5.0000 Rp - Rp -
6 Fhiser bh 5.0000 Rp - Rp - Pekerja
7 Las Doop bh 3.0000 Rp - Rp - Tukang
8 Isolasi ban bh 0.2500 Rp - Rp - Kepala tukan
9 Tenaga Kerja : Mandor
Pekerja hari orang 0.0432 Rp - Rp -
Tukang Listrik hari orang 0.0864 Rp - Rp -
Kepala Tukang listrik hari orang 0.0086 Rp - Rp -
Mandor hari orang 0.0043 Rp - Rp -
Jumlah Rp -
Keuntungan 10% Rp -
Total = Jumlah+(Keuntungan 10%) Rp -

1 UNIT PP OT 1 Phase, 10 KVA, with fault locator (88 MCB), Type Test Standar Rp -
1 INCLUDE : unit 1.0000 Rp - Rp - EFEKTIF BEKE
Panel Box (Sistem Prisma M) ###
- Dimensi : 2100 x 600 x 600mm ###
- Family : Prisma M (Free Standing) RUMUS :
Power Incomer and TN Earting Zone
Analisa Harga Satuan Elektrikal - page 23 of 40
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH HARGA TOTAL HARGA
- LBS 3P 63A Pekerja
- Quick Device Feeder, Multiclip Busbar, 80A Tukang
- MCB Multi 9, iC60L, C-Curve, 2P, 16A, isc 16kA Kepala tukan
- MCB Multi 9, iC60L, C-Curve, 2P, 2A, isc 16kA Mandor
- Residual Current Disconnector, iC60, 2P, 25A
- Universal Power Supply 150W, 24 VDC
- Terminal Block 24 mm
- Terminal Block 10 mm
- Pilot Lamp 230/250 V
- STI
- Tabung Sektring
Isolated earting system
- Current Transformer for 10 KVA
- MCB MULTI 9, IC60N, 2 Poles, 16A, C Curve
- Isolation Transformer with temperatur set Point
- Insulation Monitoring IMD Vigilohm IM20-H w/ Modbus RS485 Port
- Vigilohm Display HRP
- Fault ocator Vigilohm System with Separate Sensor
- Sensor Vigilohm
Other
- CU Busbar
- Wiring Aksesoris
2 Alat Bantu Penunjang lot 1.0000 Rp - Rp -
3 Tenaga Kerja :
Pekerja hari orang 0.0432 Rp - Rp -
Tukang Listrik hari orang 0.0864 Rp - Rp -
Kepala Tukang listrik hari orang 0.0086 Rp - Rp -
Mandor hari orang 0.0043 Rp - Rp -
Jumlah Rp -
Keuntungan 10% Rp -
Total = Jumlah+(Keuntungan 10%) Rp -

1 UNIT PP OT 1 Phase, 10 KVA, with fault locator (80 MCB), Type Test Standar Rp -
1 INCLUDE : unit 1.0000 Rp - Rp - EFEKTIF BEKE
Panel Box (Sistem Prisma M) ###
- Dimensi : 2100 x 600 x 600mm ###
- Family : Prisma M (Free Standing) RUMUS :
Power Incomer and TN Earting Zone
- LBS 3P 63A Pekerja
- Quick Device Feeder, Multiclip Busbar, 80A Tukang
- MCB Multi 9, iC60L, C-Curve, 2P, 16A, isc 16kA Kepala tukan
- MCB Multi 9, iC60L, C-Curve, 2P, 2A, isc 16kA Mandor
- Residual Current Disconnector, iC60, 2P, 25A
- Universal Power Supply 150W, 24 VDC
- Terminal Block 24 mm
- Terminal Block 10 mm
- Pilot Lamp 230/250 V
- STI
- Tabung Sektring
Isolated earting system
- Current Transformer for 10 KVA
- MCB MULTI 9, IC60N, 2 Poles, 16A, C Curve
- Isolation Transformer with temperatur set Point
- Insulation Monitoring IMD Vigilohm IM20-H w/ Modbus RS485 Port
- Vigilohm Display HRP
- Fault ocator Vigilohm System with Separate Sensor
- Sensor Vigilohm
Other
- CU Busbar
- Wiring Aksesoris
2 Alat Bantu Penunjang lot 1.0000 Rp - Rp -
3 Tenaga Kerja :
Pekerja hari orang 0.0432 Rp - Rp -
Tukang Listrik hari orang 0.0864 Rp - Rp -
Kepala Tukang listrik hari orang 0.0086 Rp - Rp -
Mandor hari orang 0.0043 Rp - Rp -
Jumlah Rp -
Keuntungan 10% Rp -
Total = Jumlah+(Keuntungan 10%) Rp -

1 UNIT PP OT 1 Phase, 10 KVA, with fault locator (72 MCB), Type Test Standar Rp -
1 INCLUDE : unit 1.0000 Rp - Rp - EFEKTIF BEKE
Panel Box (Sistem Prisma M) ###
- Dimensi : 2200 x 1200 x 600mm ###
- Family : Prisma M (Free Standing) RUMUS :
Power Incomer and TN Earting Zone
- LBS 4P 63A Pekerja
- Quick Device Feeder, Multiclip Busbar, 80A Tukang
- MCB Multi 9, iC60L, C-Curve, 2P, 16A, isc 16kA Kepala tukan
- MCB Multi 9, iC60L, C-Curve, 2P, 2A, isc 16kA Mandor
- Residual Current Disconnector, iC60, 2P, 25A
- Universal Power Supply 150W, 24 VDC
- Terminal Block 24 mm
- Terminal Block 10 mm
- Pilot Lamp 230/250 V
- STI
- Tabung Sektring
Isolated earting system
- Current Transformer for 10 KVA
- MCB MULTI 9, IC60N, 2 Poles, 16A, C Curve
- Isolation Transformer with temperatur set Point
- Insulation Monitoring IMD Vigilohm IM20-H w/ Modbus RS485 Port
- Vigilohm Display HRP
- Fault ocator Vigilohm System with Separate Sensor
- Sensor Vigilohm
Other
- CU Busbar
- Wiring Aksesoris
2 Alat Bantu Penunjang lot 1.0000 Rp - Rp -
3 Tenaga Kerja :
Pekerja hari orang 0.0432 Rp - Rp -
Tukang Listrik hari orang 0.0864 Rp - Rp -
Kepala Tukang listrik hari orang 0.0086 Rp - Rp -
Mandor hari orang 0.0043 Rp - Rp -
Jumlah Rp -
Keuntungan 10% Rp -
Total = Jumlah+(Keuntungan 10%) Rp -

1 UNIT PP OT 1 Phase, 10 KVA, with fault locator (56 MCB), Type Test Standar Rp -
Analisa Harga Satuan Elektrikal - page 24 of 40
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH HARGA TOTAL HARGA
1 INCLUDE : unit 1.0000 Rp - Rp - EFEKTIF BEKE
Panel Box (Sistem Prisma M) ###
- Dimensi : 2200 x 1200 x 600mm ###
- Family : Prisma M (Free Standing) RUMUS :
Power Incomer and TN Earting Zone
- LBS 4P 63A Pekerja
- Quick Device Feeder, Multiclip Busbar, 80A Tukang
- MCB Multi 9, iC60L, C-Curve, 2P, 16A, isc 16kA Kepala tukan
- MCB Multi 9, iC60L, C-Curve, 2P, 2A, isc 16kA Mandor
- Residual Current Disconnector, iC60, 2P, 25A
- Universal Power Supply 150W, 24 VDC
- Terminal Block 24 mm
- Terminal Block 10 mm
- Pilot Lamp 230/250 V
- STI
- Tabung Sektring
Isolated earting system
- Current Transformer for 10 KVA
- MCB MULTI 9, IC60N, 2 Poles, 16A, C Curve
- Isolation Transformer with temperatur set Point
- Insulation Monitoring IMD Vigilohm IM20-H w/ Modbus RS485 Port
- Vigilohm Display HRP
- Fault ocator Vigilohm System with Separate Sensor
- Sensor Vigilohm
Other
- CU Busbar
- Wiring Aksesoris
2 Alat Bantu Penunjang lot 1.0000 Rp - Rp -
3 Tenaga Kerja :
Pekerja hari orang 0.0432 Rp - Rp -
Tukang Listrik hari orang 0.0864 Rp - Rp -
Kepala Tukang listrik hari orang 0.0086 Rp - Rp -
Mandor hari orang 0.0043 Rp - Rp -
Jumlah Rp -
Keuntungan 10% Rp -
Total = Jumlah+(Keuntungan 10%) Rp -

1 UNIT PP OT 1 Phase, 10 KVA, with fault locator (40 MCB), Type Test Standar Rp -
1 INCLUDE : unit 1.0000 Rp - Rp - EFEKTIF BEKE
Panel Box (Sistem Prisma M) ###
- Dimensi : 2200 x 1200 x 600mm ###
- Family : Prisma M (Free Standing) RUMUS :
Power Incomer and TN Earting Zone
- LBS 4P 63A Pekerja
- Quick Device Feeder, Multiclip Busbar, 80A Tukang
- MCB Multi 9, iC60L, C-Curve, 2P, 16A, isc 16kA Kepala tukan
- MCB Multi 9, iC60L, C-Curve, 2P, 2A, isc 16kA Mandor
- Residual Current Disconnector, iC60, 2P, 25A
- Universal Power Supply 150W, 24 VDC
- Terminal Block 24 mm
- Terminal Block 10 mm
- Pilot Lamp 230/250 V
- STI
- Tabung Sektring
Isolated earting system
- Current Transformer for 10 KVA
- MCB MULTI 9, IC60N, 2 Poles, 16A, C Curve
- Isolation Transformer with temperatur set Point
- Insulation Monitoring IMD Vigilohm IM20-H w/ Modbus RS485 Port
- Vigilohm Display HRP
- Fault ocator Vigilohm System with Separate Sensor
- Sensor Vigilohm
Other
- CU Busbar
- Wiring Aksesoris
2 Alat Bantu Penunjang lot 1.0000 Rp - Rp -
3 Tenaga Kerja :
Pekerja hari orang 0.0432 Rp - Rp -
Tukang Listrik hari orang 0.0864 Rp - Rp -
Kepala Tukang listrik hari orang 0.0086 Rp - Rp -
Mandor hari orang 0.0043 Rp - Rp -
Jumlah Rp -
Keuntungan 10% Rp -
Total = Jumlah+(Keuntungan 10%) Rp -

1 UNIT PP OT 1 Phase, 10 KVA, with fault locator (18 MCB), Type Test Standar Rp -
1 INCLUDE : unit 1.0000 Rp - Rp - EFEKTIF BEKE
Panel Box (Sistem Prisma M) ###
- Dimensi : 2200 x 1200 x 600mm ###
- Family : Prisma M (Free Standing) RUMUS :
Power Incomer and TN Earting Zone
- LBS 4P 63A Pekerja
- Quick Device Feeder, Multiclip Busbar, 80A Tukang
- MCB Multi 9, iC60L, C-Curve, 2P, 16A, isc 16kA Kepala tukan
- MCB Multi 9, iC60L, C-Curve, 2P, 2A, isc 16kA Mandor
- Residual Current Disconnector, iC60, 2P, 25A
- Universal Power Supply 150W, 24 VDC
- Terminal Block 24 mm
- Terminal Block 10 mm
- Pilot Lamp 230/250 V
- STI
- Tabung Sektring
Isolated earting system
- Current Transformer for 10 KVA
- MCB MULTI 9, IC60N, 2 Poles, 16A, C Curve
- Isolation Transformer with temperatur set Point
- Insulation Monitoring IMD Vigilohm IM20-H w/ Modbus RS485 Port
- Vigilohm Display HRP
- Fault ocator Vigilohm System with Separate Sensor
- Sensor Vigilohm
Other
- CU Busbar
- Wiring Aksesoris
2 Alat Bantu Penunjang lot 1.0000 Rp - Rp -
3 Tenaga Kerja :
Pekerja hari orang 0.0432 Rp - Rp -
Tukang Listrik hari orang 0.0864 Rp - Rp -
Kepala Tukang listrik hari orang 0.0086 Rp - Rp -
Mandor hari orang 0.0043 Rp - Rp -
Analisa Harga Satuan Elektrikal - page 25 of 40
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH HARGA TOTAL HARGA
Jumlah Rp -
Keuntungan 10% Rp -
Total = Jumlah+(Keuntungan 10%) Rp -

Analisa Harga Satuan Elektrikal - page 26 of 40


HARGA SATUAN PEKERJAAN ELEKTRIKAL
PEMBANGUNAN GEDUNG KULIAH DAN INFRASTRUKTUR
UNIVERSITAS ISLAM NEGERI SULTAN MAULANA HASANUDDIN BANTEN

NO. SATUAN URAIAN PEKERJAAN HARGA SATUAN


PEKERJAAN KABEL
1 1 LOT BIAYA PENYAMBUNGAN PLN 4019,93 KVA Rp -
2 1 M' Kabel TM N2XSY 3 x 1 x 70 mm2 + Grounding Rp -
3 1 M' Kabel TM N2XSEbY 3 x 1 x 120 mm2 + Grounding Rp -
4 1 M' KABEL TR NYM 3 x 2,5 mm2 + Grounding Rp -
KABEL NYY
1 1 M' KABEL TR, NYY 4 x 6 mm2 + Grounding Rp -
2 1 M' KABEL TR, NYY 4 x 50 mm2 + Grounding Rp -
3 1 M' KABEL TR, NYY 12 x (1 x 150) mm2 + Grounding Rp -
4 1 M' KABEL TR, NYY 2 x 4 (1 x 150 mm2) + Grounding Rp -
5 1 M' KABEL TR, NYY 2 x 4 ( 1x 185) mm2 + Grounding Rp -
6 1 M' KABEL TR, NYY 4 x (4 x 185 mm2) + Grounding Rp -
7 1 M' KABEL TR, NYY 4 x (1 x 240) mm2 + Grounding Rp -
PEKERJAAN TITIK INSTALASI
1 1 TITIK TITIK INSTALLASI PENERANGAN DALAM Rp -
2 1 TITIK TITIK INSTALLASI STOP KONTAK 1 PH Rp -
3 1 TITIK TITIK INSTALLASI DAYA AC INDOOR (NYM 3 x 2,5 mm) Rp -
4 1 TITIK TITIK INSTALLASI DAYA AC INDOOR (NYM 3 x 4 mm) Rp -
5 1 TITIK TITIK INSTALLASI DAYA AC OUTDOOR (NYY 4 x 50 mm) Rp -
6 1 TITIK TITIK INSTALLASI DAYA FAN/ExHAUST (NYM 3 x 2,5 mm) Rp -
7 1 TITIK TITIK INSTALLASI DAYA FAN/ExHAUST (NYM 3 x 4 mm) Rp -
8 1 TITIK TITIK INSTALLASI DAYA POMPA (NYY 4 x 6 mm) Rp -
9 1 TITIK TITIK INSTALLASI DAYA LIFT (NYY 4 x 6 mm) Rp -

Harga Satuan Pekerjaan Elektrikal - page 27 of 40


HARGA BAHAN DAN UPAH STRUKTUR
PEMBANGUNAN GEDUNG KULIAH DAN INFRASTRUKTUR
UNIVERSITAS ISLAM NEGERI SULTAN MAULANA HASANUDDIN BANTEN

NO URAIAN HARGA SATUAN


A. DAFTAR UPAH
1 Pekerja Rp - oh
2 Tukang kayu Rp - oh
3 Tukang batu Rp - oh
4 Tukang besi Rp - oh
5 Kepala tukang Rp - oh
6 Mandor Rp - oh

B. BAHAN PASANGAN DAN BESI


1 Batu Split 1/2 Rp - m³
2 Batako Rp - bh
3 Beton Ready Mix f'c= 25 Mpa Rp - m³
4 Besi Beton BJTP 28 (Polos) Rp - kg
5 Besi Beton BJTS 42 (Ulir) Rp - kg
6 Semen Rp - kg
7 Pasir beton Rp - m³
8 Pasir pasang Rp - m³
9 Pasir urug Rp - m³

C. BAHAN KAYU
1 Kayu papan begisting kelas IV Rp - m³
2 Kayu 5/7 kelas IV Rp - m³
3 Kayu Kelas III Rp - m³
4 Multiplek 12 mm Rp - lbr

D. LAIN - LAIN
1 Air Rp - ltr
2 Paku Rp - kg
3 Minyak bekisiting Rp - ltr
4 Kawat beton Rp - kg
5 Paku biasa Rp - kg
6 Concrate Pump Rp - Hari
7 Perancah Scafolding Rp - m2

Harga Bahan dan Upah Struktur - 28 of 28


HARGA SATUAN TERPASANG STRUKTUR
PEMBANGUNAN GEDUNG KULIAH DAN INFRASTRUKTUR
UNIVERSITAS ISLAM NEGERI SULTAN MAULANA HASANUDDIN BANTEN

HARGA SATUAN
NO. URAIAN PEKERJAAN
TERPASANG

PEKERJAAN PERSIAPAN
1 1 m¹ Pengukuran dan pemasangan bowplank Rp -
2 1 ls Mobilisasi dan Demobilisasi Peralatan Bored Rp -
3 1 titik Axial test Reaction Pile/angkur (Kap. 330 ton) Rp -
4 1 titik Lateral test (Kap. 36 ton) Rp -
5 1 titik PDA Test Rp -
PEKERJAAN STRUKTUR
1 1 m³ Galian Tanah biasa sedalam 1 meter Rp -
2 1 m³ Galian tanah biasa sedalam 2 meter Rp -
3 1 m³ Galian tanah biasa sedalam 3 meter Rp -
4 1 m³ Urugan Pasir Urug Rp -
5 1 m³ Memasang Lantai Kerja Rp -
6 1 kg Memasang Besi Beton BJTP 24 Rp -
7 1 kg Memasang Besi Beton BJTD 42 Rp -
8 1 m² Memasang bekisting untuk kolom (3x Pakai) Rp -
9 1 m² Memasang bekisting untuk balok (3x Pakai) Rp -
10 1 m² Memasang bekisting untuk dinding (3x Pakai) Rp -
11 1 m² Memasang bekisting untuk plat lantai (3x Pakai) Rp -
12 1 m² Memasang bekisting untuk tangga Rp -
13 1 m² Memasang Begisting Batako Rp -
14 1 m³ Beton Ready mix f'c=25 Mpa Rp -
15 1 m³ Memasang Beton Site Mix K-175. slump 12±2 cm, w/c=0.66 Rp -
16 1 m³ Memasang Beton Site Mix K-250. slump 12±2 cm, w/c=0.56 Rp -
17 1 titik Pekerjaan Bobokan Kepala Bore Pile Ø800 Rp -
18 1 titik Pekerjaan Bobokan Kepala Strauss Pile Ø300 Rp -
19 1 m³ Mengurug kembali galian Rp -
20 1 m³ Memadatkan tanah 1 m2 tanah per 20 cm Rp -
21 1 m³ Mengurug pasir urug Rp -
22 1 m² Membuat Screed Beton + kawat ayam Rp -
23 1 m³ Memasang Pondasi Batu Kosong (Aanstamping) Rp -

Harga Satuan Terpasang Struktur - 29 of 29


HARGA UPAH DAN BAHAN PEKERJAAN ARSITEKTUR
PEMBANGUNAN GEDUNG KULIAH DAN INFRASTRUKTUR
UNIVERSITAS ISLAM NEGERI SULTAN MAULANA HASANUDDIN BANTEN

NO URAIAN HARGA SATUAN


A. DAFTAR UPAH
1 Pekerja Rp - oh
2 Pekerja Rp - jam
3 Tukang kayu Rp - oh
4 Tukang batu Rp - oh
5 Tukang cat Rp - oh
6 Tukang plafond Rp - oh
7 Kepala tukang Rp - oh
8 Mandor Rp - oh
9 Mandor Rp - jam

B. BAHAN PASANGAN DAN BESI


1 Bata ringan 100x200x600 mm Rp - m³
2 Bata ringan 100x200x600 mm Rp - bh
3 Batu split 1/2 cm Rp - m³
4 Batu split 1/2 cm Rp - kg
5 Batako Rp - bh
6 Besi beton BJTP 28 Rp - kg
7 Semen mortar floor hardener @ 50 kg Rp - kg
8 Semen Rp - kg
9 Semen mortar pasangan bata @ 40 kg Rp - sak
10 Semen mortar pasangan bata Rp - kg
11 Semen mortar plesteran @ 50 kg Rp - sak
12 Semen mortar plesteran Rp - kg
13 Semen mortar acian @ 40 kg Rp - sak
14 Pasir beton Rp - m³
15 Pasir beton Rp - kg
16 Pasir pasang Rp - m³
17 Pasir urug Rp - m³
18 Pasir batu Rp - m³
19 Tanah urug Rp - m³
20 Aggregat Kasar Untuk Pondasi Klas A Rp - m³

C. BAHAN KAYU
1 Kayu Kelas III Rp - m³

D. BAHAN FINISHING
1 Plamur (1 Galon = 5 kg) Rp - kg
2 Cat weathershield (1 pail = @ 20 liter) Rp - kg
3 Cat dustrproof (1 pail = @ 20 liter) Rp - kg
4 Cat dasar interior (@1pail = 20 liter) Rp - kg
5 Cat dasar eksterior (@1pail = 20 liter) Rp - kg
6 Cat dasar solvent based / sealer (1 pail = @ 20 liter) Rp - kg
7 Cat acrylic enamel (1 pail = @ 20 liter) Rp - kg

E. LAIN - LAIN
1 Air Rp - ltr
2 Paku Rp - kg
3 Minyak bekisiting Rp - ltr
4 Kawat beton Rp - kg
5 Dump truck 3-4 ton Rp - jam
6 Excavator 80-140 HP Kap. 0,9 m3 Rp - jam
7 Water Tank Truck 3000-4000 l Rp - jam
8 Motor Grader > 100 HP Rp - jam
9 Vibrator Roller kap. 5-8 Ton Rp - jam

Upah dan Bahan Pek. Arsitektur - page 30 of 40


HARGA SATUAN TERPASANG PEKERJAAN ARSITEKTUR
PEMBANGUNAN GEDUNG KULIAH DAN INFRASTRUKTUR
UNIVERSITAS ISLAM NEGERI SULTAN MAULANA HASANUDDIN BANTEN

NO. URAIAN PEKERJAAN HARGA SATUAN


PEKERJAAN PERSIAPAN
1 1 m² Pembersihan Lapangan dan Perataan Rp -
PEKERJAAN TANAH DAN PONDASI
1 1 m³ Galian Tanah Biasa Sedalam 1 Meter Rp -
2 1 m³ Galian Tanah Biasa Sedalam 2 Meter Rp -
3 1 m³ Galian Tanah Biasa Sedalam 3 Meter Rp -
4 1 m³ Urugan Pasir Urug Rp -
5 1 m³ Urugan Pasir Batu Rp -
6 1 m³ Urugan Pasir Beton Rp -
7 1 m³ Pemasangan Lantai Kerja Mutu Beton Site Mix K-100 Rp -
8 1 m³ Pekerjaan Galian Tanah Menggunakan Alat Berat (Mekanik) Rp -
9 1 m³ Pekerjaan Timbunan Tanah + Pemadatan Dengan Alat Berat Rp -
10 1 m³ Urugan Kembali Galian Rp -
11 1 m³ Pemadatan tanah 1 m2 tanah per 20 cm Rp -
12 1 m³ Buangan Tanah Keluar Site Rp -
13 1 m³ Buangan Tanah di Dalam Site Proyek Rp -
14 1 m' Pemasangan Saluran Gravel dia. 40 cm Rp -
PEKERJAAN ARSITEK
1 1 m² Pemasangan Dinding Bata Ringan uk. 200 x 600 x 100 mm Rp -
2 1 m² Pemasangan Dinding Bata Ringan uk. 200 x 600 x 100 mm (25 cm) Rp -
3 1 m² Pemasangan Plesteran Semen Mortar Rp -
4 1 m² Pemasangan Acian Semen Mortar Rp -
5 1 m² Pemasangan Plesteran, 1 SP : 3 PP, tebal 15 mm Rp -
6 1 m² Pemasangan Plesteran, 1 SP : 4 PP, tebal 15 mm Rp -
7 1 m² Acian semen Rp -
8 1 m' Pemasangan Opening Pintu dan Jendela Semen Biasa Rp -
9 1 m' Pemasangan Ban-Banan 10 cm Rp -
10 1 m' Pemasangan Kolom Praktis 11/11 cm Rp -
11 1 m' Pemasangan Balok Praktis 11/15 cm Rp -
12 1 m³ Membuat Beton Site Mix K-175. slump 12±2 cm, w/c=0.66 Rp -
13 1 kg Pemasangan Besi Beton Polos BJTP 24 Rp -
14 1 kg Pemasangan Besi Beton Ulir BJTD 40 Rp -
15 1 m³ Pemasangan Sloof 15x20 cm Rp -
16 1 m³ Pemasangan Meja Beton tebal 10 cm Rp -
17 1 m³ Pemasangan Beton Plat Kanopi tebal 10 cm Rp -
18 1 m² Pemasangan Dinding Partisi Cemen Board 9 mm + Gypsum board 12 mm Rp -
19 1 Hrf Pemasangan Signage Stainless Steel Tulisan Tinggi = 178 cm Rp -
20 1 Hrf Pemasangan Signage Stainless Steel Tulisan Tinggi = 40 cm Rp -
21 1 bh Pemasangan Logo/Lambang Stainless Steel Tebal 5 mm Rp -
PEKERJAAN PELAPIS LANTAI
1 1 m² Pemasangan Floor Hardener t. 1,5 mm Rp -
PEKERJAAN PENGECATAN
1 1 m² Pengecatan Dinding Weathershield (Eksterior) Rp -
2 1 m² Pengecatan Dinding Dustrproof (Interior) Rp -
3 1 m² Pengecatan Plafond Dustrproof (Interior) Rp -
4 1 m² Pengecatan Plafond Weathershield (Eksterior) Rp -
5 1 m' Pengecatan Plint Int Semi Gloss t. 10 cm Rp -

Harga Satuan Terpasang Pek. Arsitektur - page 31 of 40


Jumlah harga persatuan pekerjaan

ANALISA HARGA SATUAN PEKERJAAN STRUKTUR


PEMBANGUNAN GEDUNG KULIAH DAN INFRASTRUKTUR
UNIVERSITAS ISLAM NEGERI SULTAN MAULANA HASANUDDIN BANTEN

NO. Kebutuhan Kode Satuan Indeks Harga Satuan Jumlah Harga


PEKERJAAN PERSIAPAN
1 1 m¹ Pengukuran dan pemasangan bowplank Rp -
Bahan:
1 Kayu 5/7 m³ 0.0120 Rp - Rp -
2 Paku biasa kg 0.0200 Rp - Rp -
3 Kayu papan 3/20 m³ 0.0070 Rp - Rp -
Tenaga Kerja:
1 Pekerja L.01 oh 0.1000 Rp - Rp -
2 Tukang kayu L.02 oh 0.1000 Rp - Rp -
3 Kepala tukang L.03 oh 0.0100 Rp - Rp -
4 Mandor L.04 oh 0.0050 Rp - Rp -
Jumlah harga persatuan pekerjaan Rp -
Keuntungan+Over head 10% Rp -
Total = Jumlah+(Keuntungan+Over head 10%) Rp -
2 1 ls Mobilisasi dan Demobilisasi Peralatan Bored Rp 154,000,000.00
Bahan:
1 Alat Bor, Crane dan Excavator PC 200 Unit 1.0000 Rp 125,000,000.00 Rp 125,000,000.00
2 Akomodasi Pekerja ls 1.0000 Rp 5,000,000.00 Rp 5,000,000.00
3 Perlengkapan Safety dan Rapid test ls 1.0000 Rp 10,000,000.00 Rp 10,000,000.00
Jumlah harga persatuan pekerjaan Rp 140,000,000.00
Keuntungan+Over head 10% Rp 14,000,000.00
Total = Jumlah+(Keuntungan+Over head 10%) Rp 154,000,000.00
3 1 titik Axial test Reaction Pile/angkur (Kap. 330 ton) Rp 104,500,000.00
Bahan:
1 Mob demob alat axial dan tim ls 1.0000 Rp 60,000,000.00 Rp 60,000,000.00
2 Pekerjaan Persiapan ls 1.0000 Rp 5,000,000.00 Rp 5,000,000.00
3 Axial Test angkur (Kap. 330 ton) titik 1.0000 Rp 30,000,000.00 Rp 30,000,000.00
Jumlah harga persatuan pekerjaan Rp 95,000,000.00
Keuntungan+Over head 10% Rp 9,500,000.00
Total = Jumlah+(Keuntungan+Over head 10%) Rp 104,500,000.00
4 1 titik Lateral test (Kap. 36 ton) Rp 18,150,000.00
Bahan:
1 Mob demob alat axial dan tim ls 1.0000 Rp 5,000,000.00 Rp 5,000,000.00
2 Pekerjaan Persiapan ls 1.0000 Rp 1,500,000.00 Rp 1,500,000.00
3 Lateral test (Kap. 36 ton) titik 1.0000 Rp 10,000,000.00 Rp 10,000,000.00
Jumlah harga persatuan pekerjaan Rp 16,500,000.00
Keuntungan+Over head 10% Rp 1,650,000.00
Total = Jumlah+(Keuntungan+Over head 10%) Rp 18,150,000.00
5 1 titik PDA Test Rp 6,600,000.00
Bahan:
1 Mob demob Tim PDA ls 1.0000 Rp 2,000,000.00 Rp 2,000,000.00
2 Jasa Enjiner + Laporan ls 1.0000 Rp 1,000,000.00 Rp 1,000,000.00
3 PDA Test titik 1.0000 Rp 3,000,000.00 Rp 3,000,000.00
Jumlah harga persatuan pekerjaan Rp 6,000,000.00
Keuntungan+Over head 10% Rp 600,000.00
Total = Jumlah+(Keuntungan+Over head 10%) Rp 6,600,000.00

PEKERJAAN TANAH DAN PONDASI

1 1 m³ Galian Tanah biasa sedalam 1 meter Rp -


Tenaga Kerja:
1 Pekerja L.01 oh 0.7500 Rp - Rp -
2 Mandor L.04 oh 0.0250 Rp - Rp -
Jumlah harga persatuan pekerjaan Rp -
Keuntungan+Over head 10% Rp -
Total = Jumlah+(Keuntungan+Over head 10%) Rp -
2 1 m³ Galian tanah biasa sedalam 2 meter Rp -
Tenaga Kerja:
1 Pekerja L.01 oh 0.9000 Rp - Rp -
2 Mandor L.04 oh 0.0450 Rp - Rp -
Jumlah harga persatuan pekerjaan Rp -
Keuntungan+Over head 10% Rp -
Total = Jumlah+(Keuntungan+Over head 10%) Rp -
3 1 m³ Galian tanah biasa sedalam 3 meter Rp -
Tenaga Kerja:
1 Pekerja L.01 oh 1.0500 Rp - Rp -
2 Mandor L.04 oh 0.0670 Rp - Rp -
Jumlah harga persatuan pekerjaan Rp -
Keuntungan+Over head 10% Rp -
Total = Jumlah+(Keuntungan+Over head 10%) Rp -
4 1 m³ Urugan Pasir Urug Rp -
Bahan:
1 Pasir Urug m³ 1.2000 Rp - Rp -
Tenaga Kerja:
1 Pekerja L.01 oh 0.3300 Rp - Rp -
2 Mandor L.04 oh 0.0100 Rp - Rp -
Jumlah harga persatuan pekerjaan Rp -

Analisa Harga Satuan Struktur - 32 of ?


Keuntungan+Over head 10% Rp -
Total = Jumlah+(Keuntungan+Over head 10%) Rp -
5 1 m³ Memasang Lantai Kerja Rp -
Bahan:
1 Semen kg 230.000 Rp - Rp -
2 Pasir beton m³ 0.6379 Rp - Rp -
3 Batu Split 1/2 m³ 0.7607 Rp - Rp -
4 Air ltr 200.000 Rp - Rp -
Tenaga Kerja:
1 Pekerja L.01 oh 1.2000 Rp - Rp -
2 Tukang batu L.02 oh 0.2000 Rp - Rp -
3 Kepala tukang L.03 oh 0.0200 Rp - Rp -
4 Mandor L.04 oh 0.0600 Rp - Rp -
Jumlah harga persatuan pekerjaan Rp -
Keuntungan+Over head 10% Rp -
Total = Jumlah+(Keuntungan+Over head 10%) Rp -
6 1 kg Memasang Besi Beton BJTP 24 Rp -
Bahan:
1 Besi beton BJTP 28 kg 10.5000 Rp - Rp -
2 Kawat beton kg 0.1500 Rp - Rp -
Tenaga Kerja:
1 Pekerja L.01 oh 0.0700 Rp - Rp -
2 Tukang besi L.02 oh 0.0700 Rp - Rp -
3 Kepala tukang L.03 oh 0.0070 Rp - Rp -
4 Mandor L.04 oh 0.0040 Rp - Rp -
Jumlah pekerjaan per sepuluh kg Rp -
Jumlah harga persatuan pekerjaan Rp -
Keuntungan+Over head 10% Rp -
Total = Jumlah+(Keuntungan+Over head 10%) Rp -
7 1 kg Memasang Besi Beton BJTD 42 Rp -
Bahan:
1 Besi Beton BJTD 42 kg 10.5000 Rp - Rp -
2 Kawat beton kg 0.1500 Rp - Rp -
Tenaga Kerja:
1 Pekerja L.01 oh 0.0700 Rp - Rp -
2 Tukang besi L.02 oh 0.0700 Rp - Rp -
3 Kepala tukang L.03 oh 0.0070 Rp - Rp -
4 Mandor L.04 oh 0.0040 Rp - Rp -
Jumlah pekerjaan per sepuluh kg Rp -
Jumlah harga persatuan pekerjaan Rp -
Keuntungan+Over head 10% Rp -
Total = Jumlah+(Keuntungan+Over head 10%) Rp -
8 1 m² Memasang bekisting untuk kolom (3x Pakai) Rp -
Bahan:
1 Multiplex 12mm Lbr 0.1280 Rp - Rp -
2 Kaso 5/7 cm m³ 0.0060 Rp - Rp -
3 Paku 5cm dan 7cm Kg 0.2500 Rp - Rp -
4 Minyak bekisiting Ltr 0.2000 Rp - Rp -
5 Perancah Scaffolding m2 1.0000 Rp - Rp -
Tenaga Kerja:
1 Pekerja L.01 oh 0.2200 Rp - Rp -
2 Tukang kayu L.02 oh 0.1100 Rp - Rp -
3 Kepala tukang L.03 oh 0.0110 Rp - Rp -
4 Mandor L.04 oh 0.0220 Rp - Rp -
Peralatan :
1 Peralatan (20% dari Bahan)
Jumlah harga persatuan pekerjaan Rp -
Keuntungan+Over head 10% Rp -
Total = Jumlah+(Keuntungan+Over head 10%) Rp -
9 1 m² Memasang bekisting untuk balok (3x Pakai) Rp -
Bahan:
1 Multiplex 12mm Lbr 0.1280 Rp - Rp -
2 Kaso 5/7 cm m³ 0.0110 Rp - Rp -
3 Paku 5cm dan 7cm Kg 0.2500 Rp - Rp -
4 Minyak bekisiting Ltr 0.2000 Rp - Rp -
5 Perancah Scaffolding m2 1.0000 Rp - Rp -
Tenaga Kerja:
1 Pekerja L.01 oh 0.2400 Rp - Rp -
2 Tukang kayu L.02 oh 0.1200 Rp - Rp -
3 Kepala tukang L.03 oh 0.0120 Rp - Rp -
4 Mandor L.04 oh 0.0240 Rp - Rp -
Peralatan :
1 Peralatan (20% dari Bahan)
Jumlah harga persatuan pekerjaan Rp -
Keuntungan+Over head 10% Rp -
Total = Jumlah+(Keuntungan+Over head 10%) Rp -
10 1 m² Memasang bekisting untuk dinding (3x Pakai) Rp -
Bahan:
1 Multiplex 12mm Lbr 0.1280 Rp - Rp -
2 Kaso 5/7 cm m³ 0.0050 Rp - Rp -
3 Paku 5cm dan 7cm Kg 0.2400 Rp - Rp -
4 Minyak bekisiting Ltr 0.2000 Rp - Rp -
5 Perancah Scaffolding m2 1.0000 Rp - Rp -
Tenaga Kerja:
1 Pekerja L.01 oh 0.2400 Rp - Rp -

Analisa Harga Satuan Struktur - 33 of ?


2 Tukang kayu L.02 oh 0.1200 Rp - Rp -
3 Kepala tukang L.03 oh 0.0120 Rp - Rp -
4 Mandor L.04 oh 0.0240 Rp - Rp -
Peralatan :
1 Peralatan (20% dari Bahan)
Jumlah harga persatuan pekerjaan Rp -
Keuntungan+Over head 10% Rp -
Total = Jumlah+(Keuntungan+Over head 10%) Rp -
11 1 m² Memasang bekisting untuk plat lantai (3x Pakai) Rp -
Bahan:
1 Multiplex 12mm Lbr 0.1280 Rp - Rp -
2 Kaso 5/7 cm m³ 0.0050 Rp - Rp -
3 Paku 5cm dan 7cm Kg 0.2200 Rp - Rp -
4 Minyak bekisiting Ltr 0.2000 Rp - Rp -
5 Perancah Scaffolding m2 1.0000 Rp - Rp -
Tenaga Kerja:
1 Pekerja L.01 oh 0.2000 Rp - Rp -
2 Tukang kayu L.02 oh 0.1000 Rp - Rp -
3 Kepala tukang L.03 oh 0.0100 Rp - Rp -
4 Mandor L.04 oh 0.0200 Rp - Rp -
Peralatan :
1 Peralatan (20% dari Bahan)
Jumlah harga persatuan pekerjaan Rp -
Keuntungan+Over head 10% Rp -
Total = Jumlah+(Keuntungan+Over head 10%) Rp -
12 1 m² Memasang bekisting untuk tangga Rp -
Bahan:
1 Multiplex 12mm Lbr 0.1280 Rp - Rp -
2 Kaso 5/7 cm m³ 0.0110 Rp - Rp -
3 Paku 5cm dan 7cm Kg 0.2500 Rp - Rp -
4 Minyak bekisiting Ltr 0.2000 Rp - Rp -
5 Perancah Scaffolding m2 1.0000 Rp - Rp -
Tenaga Kerja:
1 Pekerja L.01 oh 0.2400 Rp - Rp -
2 Tukang kayu L.02 oh 0.1200 Rp - Rp -
3 Kepala tukang L.03 oh 0.0120 Rp - Rp -
4 Mandor L.04 oh 0.0240 Rp - Rp -
Peralatan :
1 Peralatan (20% dari Bahan)
Jumlah harga persatuan pekerjaan Rp -
Keuntungan+Over head 10% Rp -
Total = Jumlah+(Keuntungan+Over head 10%) Rp -
13 1 m² Memasang Begisting Batako Rp -
Bahan:
1 Batako bh 23.3333 Rp - Rp -
2 Semen kg 14.3700 Rp - Rp -
3 Pasir pasang m³ 0.0400 Rp - Rp -
Tenaga Kerja:
1 Pekerja L.01 oh 0.3000 Rp - Rp -
2 Tukang batu L.02 oh 0.1000 Rp - Rp -
3 Kepala tukang L.03 oh 0.0100 Rp - Rp -
4 Mandor L.04 oh 0.0150 Rp - Rp -
Jumlah harga persatuan pekerjaan Rp -
Keuntungan+Over head 10% Rp -
Total = Jumlah+(Keuntungan+Over head 10%) Rp -
14 1 m³ Beton Ready mix f'c=25 Mpa Rp -
Bahan:
1 Ready mix f'c=25 Mpa m³ 1.0200 Rp - Rp -
2 Peralatan (pompa beton, vibrator dll) Sewa Hari 0.1200 Rp - Rp -
Tenaga Kerja:
1 Pekerja L.01 oh 1.0000 Rp - Rp -
2 Tukang batu L.02 oh 0.2500 Rp - Rp -
3 Kepala tukang L.03 oh 0.0250 Rp - Rp -
4 Mandor L.04 oh 0.1000 Rp - Rp -
Jumlah harga persatuan pekerjaan Rp -
Keuntungan+Over head 10% Rp -
Total = Jumlah+(Keuntungan+Over head 10%) Rp -
15 1 m³ Memasang Beton Site Mix K-175. slump 12±2 cm, w/c=0.66 Rp -
Bahan:
1 Semen kg 326.0000 Rp - Rp -
2 Pasir Beton m³ 0.5630 Rp - Rp -
3 Batu Split 1/2 m³ 0.7097 Rp - Rp -
4 Air ltr 215.0000 Rp - Rp -
Tenaga Kerja:
1 Pekerja L.01 oh 1.6500 Rp - Rp -
2 Tukang batu L.02 oh 0.2750 Rp - Rp -
3 Kepala tukang L.03 oh 0.0280 Rp - Rp -
4 Mandor L.04 oh 0.0830 Rp - Rp -
Jumlah harga persatuan pekerjaan Rp -
Keuntungan+Over head 10% Rp -
Total = Jumlah+(Keuntungan+Over head 10%) Rp -
16 1 m³ Memasang Beton Site Mix K-250. slump 12±2 cm, w/c=0.56 Rp -
Bahan:
1 Semen kg 384.0000 Rp - Rp -
2 Pasir Beton m³ 0.5126 Rp - Rp -

Analisa Harga Satuan Struktur - 34 of ?


3 Batu Split 1/2 m³ 0.7166 Rp - Rp -
4 Air ltr 215.0000 Rp - Rp -
Tenaga Kerja:
1 Pekerja L.01 oh 1.6500 Rp - Rp -
2 Tukang batu L.02 oh 0.2750 Rp - Rp -
3 Kepala tukang L.03 oh 0.0280 Rp - Rp -
4 Mandor L.04 oh 0.0830 Rp - Rp -
Jumlah harga persatuan pekerjaan Rp -
Keuntungan+Over head 10% Rp -
Total = Jumlah+(Keuntungan+Over head 10%) Rp -
17 1 titik Pekerjaan Bobokan Kepala Bore Pile Ø800 Rp -
Tenaga:
1 Pekerja L.01 oh 1.0000 Rp - Rp -
2 Tukang besi L.02 oh 0.2500 Rp - Rp -
3 Alat Bantu ls 0.5027 Rp - Rp -
Jumlah harga persatuan pekerjaan Rp -
Keuntungan+Over head 10% Rp -
Total = Jumlah+(Keuntungan+Over head 10%) Rp -
18 1 titik Pekerjaan Bobokan Kepala Strauss Pile Ø300 Rp -
Tenaga:
1 Pekerja L.01 oh 0.5000 Rp - Rp -
2 Tukang besi L.02 oh 0.2500 Rp - Rp -
3 Alat Bantu ls 0.5027 Rp - Rp -
Jumlah harga persatuan pekerjaan Rp -
Keuntungan+Over head 10% Rp -
Total = Jumlah+(Keuntungan+Over head 10%) Rp -
19 1 m³ Mengurug kembali galian Rp -
Tenaga Kerja:
1 Pekerja L.01 oh 0.2500 Rp - Rp -
2 Mandor L.04 oh 0.0083 Rp - Rp -
Jumlah harga persatuan pekerjaan Rp -
Keuntungan+Over head 10% Rp -
Total = Jumlah+(Keuntungan+Over head 10%) Rp -
20 1 m³ Memadatkan tanah 1 m2 tanah per 20 cm Rp -
Tenaga Kerja:
1 Pekerja L.01 oh 0.3000 Rp - Rp -
2 Mandor L.04 oh 0.0500 Rp - Rp -
Jumlah harga persatuan pekerjaan Rp -
Keuntungan+Over head 10% Rp -
Total = Jumlah+(Keuntungan+Over head 10%) Rp -
21 1 m³ Mengurug pasir urug Rp -
Bahan:
1 Pasir Urug m³ 1.2000 Rp - Rp -
Tenaga Kerja:
1 Pekerja L.01 oh 0.3300 Rp - Rp -
2 Mandor L.04 oh 0.0100 Rp - Rp -
Jumlah harga persatuan pekerjaan Rp -
Keuntungan+Over head 10% Rp -
Total = Jumlah+(Keuntungan+Over head 10%) Rp -
22 1 m² Membuat Screed Beton + kawat ayam Rp 20,212.50
Bahan:
1 Semen kg 7.7760 Rp - Rp -
2 Pasir pasang m³ 0.0230 Rp - Rp -
3 Kawat ayam m2 1.0500 Rp 17,500.00 Rp 18,375.00
Tenaga Kerja:
1 Pekerja L.01 oh 0.3000 Rp - Rp -
2 Tukang batu L.02 oh 0.1500 Rp - Rp -
3 Kepala tukang L.03 oh 0.0150 Rp - Rp -
4 Mandor L.04 oh 0.0150 Rp - Rp -
Jumlah harga persatuan pekerjaan Rp 18,375.00
Keuntungan+Over head 10% Rp 1,837.50
Total = Jumlah+(Keuntungan+Over head 10%) Rp 20,212.50
23 1 m³ Memasang Pondasi Batu Kosong (Aanstamping) Rp -
Bahan:
1 Batu Belah 15/20 cm m³ 1.2000 Rp - Rp -
2 Pasir Urug m³ 0.4320 Rp - Rp -
Tenaga Kerja:
1 Pekerja L.01 oh 0.7800 Rp - Rp -
2 Tukang batu L.02 oh 0.3900 Rp - Rp -
3 Kepala tukang L.03 oh 0.0390 Rp - Rp -
4 Mandor L.04 oh 0.0390 Rp - Rp -
Jumlah harga persatuan pekerjaan Rp -
Keuntungan+Over head 10% Rp -
Total = Jumlah+(Keuntungan+Over head 10%) Rp -

Analisa Harga Satuan Struktur - 35 of ?


### Jumlah harga persatuan pekerjaan

ANALISA HARGA SATUAN PEKERJAAN ARSITEKTUR


PEMBANGUNAN GEDUNG KULIAH DAN INFRASTRUKTUR
UNIVERSITAS ISLAM NEGERI SULTAN MAULANA HASANUDDIN BANTEN

NO ITEM PEKERJAAN KODE SAT. KOEF. HARGA SATUAN JUMLAH HARGA


###
PEKERJAAN PERSIAPAN
1 1 m² Pembersihan Lapangan dan Perataan Rp -
Tenaga Kerja
1 Pekerja oh 0.1000 Rp - -
2 Mandor oh 0.0500 Rp - -
Jumlah harga persatuan pekerjaan -
Keuntungan+Over head 10% Rp -
Total = Jumlah+(Keuntungan+Over head 10%) Rp -
PEKERJAAN TANAH DAN PONDASI

1 1 m³ Galian Tanah Biasa Sedalam 1 Meter Rp -


Tenaga Kerja:
1 Pekerja L.01 oh 0.7500 Rp - Rp -
2 Mandor L.04 oh 0.0250 Rp - Rp -
Jumlah harga persatuan pekerjaan Rp -
Keuntungan+Over head 10% Rp -
Total = Jumlah+(Keuntungan+Over head 10%) Rp -
2 1 m³ Galian Tanah Biasa Sedalam 2 Meter Rp -
Tenaga Kerja:
1 Pekerja L.01 oh 0.9000 Rp - Rp -
2 Mandor L.04 oh 0.0450 Rp - Rp -
Jumlah harga persatuan pekerjaan Rp -
Keuntungan+Over head 10% Rp -
Total = Jumlah+(Keuntungan+Over head 10%) Rp -
3 1 m³ Galian Tanah Biasa Sedalam 3 Meter Rp -
Tenaga Kerja:
1 Pekerja L.01 oh 1.0500 Rp - Rp -
2 Mandor L.04 oh 0.0670 Rp - Rp -
Jumlah harga persatuan pekerjaan Rp -
Keuntungan+Over head 10% Rp -
Total = Jumlah+(Keuntungan+Over head 10%) Rp -
4 1 m³ Urugan Pasir Urug Rp -
Bahan:
1 Pasir Urug m³ 1.2000 Rp - Rp -
Tenaga Kerja:
1 Pekerja L.01 oh 0.3000 Rp - Rp -
2 Mandor L.04 oh 0.0100 Rp - Rp -
Jumlah harga persatuan pekerjaan Rp -
Keuntungan+Over head 10% Rp -
Total = Jumlah+(Keuntungan+Over head 10%) Rp -
5 1 m³ Urugan Pasir Batu Rp -
Bahan:
1 Pasir Batu m³ 1.2000 Rp - Rp -
Tenaga Kerja:
1 Pekerja L.01 oh 0.3000 Rp - Rp -
2 Mandor L.04 oh 0.0100 Rp - Rp -
Jumlah harga persatuan pekerjaan Rp -
Keuntungan+Over head 10% Rp -
Total = Jumlah+(Keuntungan+Over head 10%) Rp -
6 1 m³ Urugan Pasir Beton Rp -
Bahan:
1 Pasir Beton m³ 1.2000 Rp - Rp -
Tenaga Kerja:
1 Pekerja L.01 oh 0.3000 Rp - Rp -
2 Mandor L.04 oh 0.0100 Rp - Rp -
Jumlah harga persatuan pekerjaan Rp -
Keuntungan+Over head 10% Rp -
Total = Jumlah+(Keuntungan+Over head 10%) Rp -
7 1 m³ Pemasangan Lantai Kerja Mutu Beton Site Mix K-100 Rp -
Bahan:
1 Semen kg 230.0000 Rp - Rp -
2 Pasir beton kg 893.0000 Rp - Rp -
3 Kerikil beton kg 1,027.0000 Rp - Rp -
4 Air liter 200.0000 Rp - Rp -
Tenaga Kerja:
1 Pekerja L.01 oh 1.2000 Rp - Rp -
2 Tukang batu L.02 oh 0.2000 Rp - Rp -
3 Kepala tukang L.03 oh 0.0200 Rp - Rp -
4 Mandor L.04 oh 0.0600 Rp - Rp -
Jumlah harga persatuan pekerjaan Rp -
Keuntungan+Over head 10% Rp -
Total = Jumlah+(Keuntungan+Over head 10%) Rp -
8 1 m³ Pekerjaan Galian Tanah Menggunakan Alat Berat (Mekanik) Rp -
Tenaga Kerja:
1 Pekerja L.01 oh 0.0511 Rp - Rp -
2 Mandor L.04 oh 0.0256 Rp - Rp -
Peralatan:
1 Excavator 80-140 HP Kap. 0,9 m3 jam 0.0256 Rp - Rp -
2 Dump truck 3-4 ton jam 0.1019 Rp - Rp -
Jumlah harga persatuan pekerjaan Rp -
Keuntungan+Over head 10% Rp -
Total = Jumlah+(Keuntungan+Over head 10%) Rp -
9 1 m³ Pekerjaan Timbunan Tanah + Pemadatan Dengan Alat Berat Rp -
Bahan:
1 Tanah Urug m³ 1.2000 Rp - Rp -
Tenaga Kerja:
1 Pekerja L.01 oh 0.0054 Rp - Rp -
2 Mandor L.04 oh 0.0014 Rp - Rp -
Peralatan :
1 Excavator jam 0.0082 Rp - Rp -
2 Dump Truck jam 0.4854 Rp - Rp -
3 Motor Grader jam 0.0037 Rp - Rp -
4 Vibro Roller jam 0.0042 Rp - Rp -
5 Water Tank Truck jam 0.0070 Rp - Rp -
Jumlah harga persatuan pekerjaan Rp -

Analisa Harga Satuan Pek. Arsitektur - page 36 of 40


Keuntungan+Over head 10% Rp -
Total = Jumlah+(Keuntungan+Over head 10%) Rp -
10 1 m³ Urugan Kembali Galian Rp -
Tenaga Kerja:
1 Pekerja L.01 oh 0.5000 Rp - Rp -
2 Mandor L.04 oh 0.0500 Rp - Rp -
Jumlah harga persatuan pekerjaan Rp -
Keuntungan+Over head 10% Rp -
Total = Jumlah+(Keuntungan+Over head 10%) Rp -
11 1 m³ Pemadatan tanah 1 m2 tanah per 20 cm Rp -
Tenaga Kerja:
1 Pekerja L.01 oh 0.5000 Rp - Rp -
2 Mandor L.04 oh 0.0500 Rp - Rp -
Jumlah harga persatuan pekerjaan Rp -
Keuntungan+Over head 10% Rp -
Total = Jumlah+(Keuntungan+Over head 10%) Rp -
12 1 m³ Buangan Tanah Keluar Site Rp -
Bahan:
1 Dumptruk jam 0.0770 Rp - Rp -
2 Alat Bantu ls 1.0000 Rp - Rp -
Tenaga Kerja:
1 Pekerja L.01 oh 0.1539 Rp - Rp -
2 Mandor L.04 oh 0.0154 Rp - Rp -
Jumlah harga persatuan pekerjaan Rp -
Keuntungan+Over head 10% Rp -
Total = Jumlah+(Keuntungan+Over head 10%) Rp -
13 1 m³ Buangan Tanah di Dalam Site Proyek Rp -
Bahan:
1 Dumptruk jam 0.0450 Rp - Rp -
Tenaga Kerja:
1 Pekerja L.01 oh 0.1539 Rp - Rp -
2 Mandor L.04 oh 0.0154 Rp - Rp -
Jumlah harga persatuan pekerjaan Rp -
Keuntungan+Over head 10% Rp -
Total = Jumlah+(Keuntungan+Over head 10%) Rp -
14 1 m' Pemasangan Kansteen Beton uk. 60/28/15 cm #NAME?
Bahan:
1 Kansteen 60x28x15 cm bh 1.8333 #NAME? #NAME?
2 Pasir pasang m³ 0.0010 Rp - Rp -
Tenaga Kerja: RUMUS :
1 Pekerja L.01 oh 0.0500 Rp - Rp -
2 Tukang batu L.02 oh 0.1000 Rp - Rp -
3 Kepala tukang L.03 oh 0.0500 Rp - Rp -
4 Mandor L.04 oh 0.0250 Rp - Rp -
Jumlah harga persatuan pekerjaan #NAME?
Keuntungan+Over head 10% #NAME?
Total = Jumlah+(Keuntungan+Over head 10%) #NAME?
15 1 m' Pemasangan Saluran Gravel dia. 40 cm Rp 28,050.00
Bahan:
1 Gravel dia. 40 cm m' 1.0200 Rp 25,000.00 Rp 25,500.00
Tenaga Kerja:
1 Pekerja L.01 oh 0.0833 Rp - Rp -
2 Mandor L.04 oh 0.0083 Rp - Rp -
Jumlah harga persatuan pekerjaan Rp 25,500.00
Keuntungan+Over head 10% Rp 2,550.00
Total = Jumlah+(Keuntungan+Over head 10%) Rp 28,050.00
PEKERJAAN ARSITEKTUR
1 1 m² Pemasangan Dinding Bata Ringan uk. 200 x 600 x 100 mm Rp -
Bahan: 1 m3 bata rin
1 Bata ringan 100x200x600 bh 8.750 Rp - Rp -
2 Semen mortar perekat bata ringan Setara @ 40 kg kg 4.200 Rp - Rp -
Tenaga Kerja: RUMUS :
1 Pekerja L.01 oh 0.0786 Rp - Rp -
2 Tukang batu L.02 oh 0.1571 Rp - Rp -
3 Kepala tukang L.03 oh 0.0157 Rp - Rp -
4 Mandor L.04 oh 0.0016 Rp - Rp -
Jumlah harga persatuan pekerjaan Rp -
Keuntungan+Over head 10% Rp -
Total = Jumlah+(Keuntungan+Over head 10%) Rp -
2 1 m² Pemasangan Dinding Bata Ringan uk. 200 x 600 x 100 mm (25 cm) Rp -
Bahan: 1 m3 bata rin
1 Bata ringan 100x200x600 bh 17.500 Rp - Rp -
2 Semen mortar perekat bata ringan Setara @ 40 kg kg 8.400 Rp - Rp -
Tenaga Kerja: RUMUS :
1 Pekerja L.01 oh 0.1571 Rp - Rp -
2 Tukang batu L.02 oh 0.3143 Rp - Rp -
3 Kepala tukang L.03 oh 0.0314 Rp - Rp -
4 Mandor L.04 oh 0.0031 Rp - Rp -
Jumlah harga persatuan pekerjaan Rp -
Keuntungan+Over head 10% Rp -
Total = Jumlah+(Keuntungan+Over head 10%) Rp -
3 1 m² Pemasangan Plesteran Semen Mortar Rp -
Bahan: 1 Sak = 2,4
1 Semen mortar plesteran @ 40 kg kg 17.500 Rp - Rp -
Tenaga Kerja: RUMUS :
1 Pekerja L.01 oh 0.0655 Rp - Rp -
2 Tukang batu L.02 oh 0.1310 Rp - Rp -
3 Kepala tukang L.03 oh 0.0131 Rp - Rp -
4 Mandor L.04 oh 0.0013 Rp - Rp -
Jumlah harga persatuan pekerjaan Rp -
Keuntungan+Over head 10% Rp -
Total = Jumlah+(Keuntungan+Over head 10%) Rp -
4 1 m² Pemasangan Acian Semen Mortar Rp -
Bahan: EFEKTIF BE
1 Semen mortar acian Setara @ 40 kg kg 0.050 Rp - Rp -
Tenaga Kerja: 1 Sak = 20 m
1 Pekerja L.01 oh 0.2000 Rp - Rp -
2 Tukang batu L.02 oh 0.1000 Rp - Rp -
3 Kepala tukang L.03 oh 0.0100 Rp - Rp -
4 Mandor L.04 oh 0.0100 Rp - Rp -
Jumlah harga persatuan pekerjaan Rp -
Keuntungan+Over head 10% Rp -

Analisa Harga Satuan Pek. Arsitektur - page 37 of 40


Total = Jumlah+(Keuntungan+Over head 10%) Rp -
5 1 m² Pemasangan Plesteran, 1 SP : 3 PP, tebal 15 mm Rp -
Bahan:
1 Semen Portland kg 7.7760 Rp - Rp -
2 Pasir Pasang m³ 0.0230 Rp - Rp -
Tenaga Kerja:
1 Pekerja L.01 oh 0.3000 Rp - Rp -
2 Tukang batu L.02 oh 0.1500 Rp - Rp -
3 Kepala tukang L.03 oh 0.0150 Rp - Rp -
4 Mandor L.04 oh 0.0150 Rp - Rp -
Jumlah harga persatuan pekerjaan Rp -
Keuntungan+Over head 10% Rp -
Total = Jumlah+(Keuntungan+Over head 10%) Rp -
6 1 m² Pemasangan Plesteran, 1 SP : 4 PP, tebal 15 mm Rp -
Bahan:
1 Semen Portland kg 6.2400 Rp - Rp -
2 Pasir Pasang m³ 0.0240 Rp - Rp -
Tenaga Kerja:
1 Pekerja L.01 oh 0.3000 Rp - Rp -
2 Tukang batu L.02 oh 0.1500 Rp - Rp -
3 Kepala tukang L.03 oh 0.0150 Rp - Rp -
4 Mandor L.04 oh 0.0150 Rp - Rp -
Jumlah harga persatuan pekerjaan Rp -
Keuntungan+Over head 10% Rp -
Total = Jumlah+(Keuntungan+Over head 10%) Rp -
7 1 m² Acian semen Rp -
Bahan:
1 Semen kg 3.2500 Rp - Rp -
Tenaga Kerja:
1 Pekerja L.01 oh 0.2000 Rp - Rp -
2 Tukang batu L.02 oh 0.1000 Rp - Rp -
3 Kepala tukang L.03 oh 0.0100 Rp - Rp -
4 Mandor L.04 oh 0.0100 Rp - Rp -
Jumlah harga persatuan pekerjaan Rp -
Keuntungan+Over head 10% Rp -
Total = Jumlah+(Keuntungan+Over head 10%) Rp -
8 1 m' Pemasangan Nat Tali Air Aluminium 20x20 mm Rp -
Bahan :
1 Semen kg 1.0833 Rp - Rp -

Tenaga Kerja :
1 Pekerja L.01 oh 0.0100 Rp - Rp -
2 Tukang batu L.02 oh 0.0200 Rp - Rp -
3 Kepala tukang L.03 oh 0.0010 Rp - Rp -
4 Mandor L.04 oh 0.0010 Rp - Rp -
Jumlah harga persatuan pekerjaan Rp -
Keuntungan+Over head 10% Rp -
Total = Jumlah+(Keuntungan+Over head 10%) Rp -
9 1 m' Pemasangan Opening Pintu dan Jendela Semen Biasa Rp -
Bahan:
1 Membuat plesteran semen biasa m' 0.1650 Rp - Rp -
2 Membuat acian semen biasa m' 0.1650 Rp - Rp -
Jumlah harga persatuan pekerjaan Rp -
10 1 m' Pemasangan Ban-Banan 10 cm Rp -
Bahan:
1 Membuat plesteran semen biasa m' 0.5500 Rp - Rp -
2 Membuat acian semen biasa m' 0.5500 Rp - Rp -
Jumlah harga persatuan pekerjaan Rp -
11 1 m' Pemasangan Kolom Praktis 11/11 cm Rp -
1 Kayu kelas III m³ 0.0020 Rp - Rp -
2 Paku 5 cm - 12 cm kg 0.0100 Rp - Rp -
3 Minyak bekisting ltr besi 8
4 Besi beton polos kg 4.8671 Rp - Rp -
5 Kawat beton kg 0.4500 Rp - Rp -
6 Semen portland kg 4.0000 Rp - Rp -
7 Pasir beton m³ 0.0060 Rp - Rp -
8 kerikil m³ 0.0090 Rp - Rp -
Tenaga Kerja:
1 Pekerja L.01 oh 0.1800 Rp - Rp -
2 Tukang batu L.02 oh 0.0200 Rp - Rp -
3 Tukang kayu L.02 oh 0.0200 Rp - Rp -
4 Tukang besi L.02 oh 0.0200 Rp - Rp -
5 Kepala tukang L.03 oh 0.0060 Rp - Rp -
6 Mandor L.04 oh 0.0090 Rp - Rp -
Jumlah harga persatuan pekerjaan Rp -
Keuntungan+Over head 10% Rp -
Total = Jumlah+(Keuntungan+Over head 10%) Rp -
12 1 m' Pemasangan Balok Praktis 11/15 cm Rp -
1 Kayu kelas III m³ 0.0030 Rp - Rp -
2 Paku 5 cm - 12 cm kg 0.0200 Rp - Rp -
3 Minyak bekisting ltr ###
4 Besi beton polos kg 3.5182 Rp - Rp -
5 Kawat beton kg 0.0500 Rp - Rp -
6 Semen portland kg 5.5000 Rp - Rp -
7 Pasir beton m³ 0.0090 Rp - Rp -
8 kerikil m³ 0.0150 Rp - Rp -
Tenaga Kerja:
1 Pekerja L.01 oh 0.2970 Rp - Rp -
2 Tukang batu L.02 oh 0.0330 Rp - Rp -
3 Tukang kayu L.02 oh 0.0330 Rp - Rp -
4 Tukang besi L.02 oh 0.0330 Rp - Rp -
5 Kepala tukang L.03 oh 0.0100 Rp - Rp -
6 Mandor L.04 oh 0.0150 Rp - Rp -
Jumlah harga persatuan pekerjaan Rp -
Keuntungan+Over head 10% Rp -
Total = Jumlah+(Keuntungan+Over head 10%) Rp -
13 1 m³ Membuat Beton Site Mix K-175. slump 12±2 cm, w/c=0.66 Rp -
Bahan: ###
1 Semen kg 326.0000 Rp - Rp -
2 Pasir Beton m³ 0.5630 Rp - Rp -
3 Batu Split 1/2 m³ 0.7097 Rp - Rp -
Tenaga Kerja:

Analisa Harga Satuan Pek. Arsitektur - page 38 of 40


1 Pekerja L.01 oh 1.6500 Rp - Rp -
2 Tukang batu L.02 oh 0.2750 Rp - Rp -
3 Kepala tukang L.03 oh 0.0280 Rp - Rp -
4 Mandor L.04 oh 0.0830 Rp - Rp -
Jumlah harga persatuan pekerjaan Rp -
Keuntungan+Over head 10% Rp -
Total = Jumlah+(Keuntungan+Over head 10%) Rp -
14 1 kg Pemasangan Besi Beton Polos BJTP 24 Rp -
Bahan:
1 Besi beton BJTP 24 kg 10.5000 Rp - Rp -
2 Kawat beton kg 0.1500 Rp - Rp -
Tenaga Kerja:
1 Pekerja L.01 oh 0.0700 Rp - Rp -
2 Tukang besi L.02 oh 0.0700 Rp - Rp -
3 Kepala tukang L.03 oh 0.0070 Rp - Rp -
4 Mandor L.04 oh 0.0040 Rp - Rp -
Jumlah pekerjaan per sepuluh kg Rp -
Jumlah harga persatuan pekerjaan Rp -
Keuntungan+Over head 10% Rp -
Total = Jumlah+(Keuntungan+Over head 10%) Rp -
15 1 kg Pemasangan Besi Beton Ulir BJTD 40 Rp -
Bahan:
1 Besi beton ulir BJTD 40 kg 10.5000 Rp - Rp -
2 Kawat beton kg 0.1500 Rp - Rp -
Tenaga Kerja:
1 Pekerja L.01 oh 0.0700 Rp - Rp -
2 Tukang besi L.02 oh 0.0700 Rp - Rp -
3 Kepala tukang L.03 oh 0.0070 Rp - Rp -
4 Mandor L.04 oh 0.0040 Rp - Rp -
Jumlah pekerjaan per sepuluh kg Rp -
Jumlah harga persatuan pekerjaan Rp -
Keuntungan+Over head 10% Rp -
Total = Jumlah+(Keuntungan+Over head 10%) Rp -
16 1 m³ Pemasangan Sloof 15x20 cm Rp -
1 Beton mutu K 175 ,slump ( 12 + 2) cm m³ 1.0000 Rp - Rp -
2 Besi 4d10, d8-150 kg 61.6500 Rp - Rp -
3 Pemasangan bekisting untuk balok m² 4.4444 Rp - Rp -
Jumlah harga persatuan pekerjaan Rp -
17 1 m³ Pemasangan Meja Beton tebal 10 cm Rp -
1 Beton mutu K 175 ,slump ( 12 + 2) cm m³ 1.0000 Rp - Rp -
2 Besi U 24 (d8-150) kg 52.6667 Rp - Rp -
3 Pemasangan bekisting untuk plat lantai m² 5.0000 Rp - Rp -
Jumlah harga persatuan pekerjaan Rp -
18 1 m³ Pemasangan Beton Plat Kanopi tebal 10 cm Rp -
1 Beton mutu K 175 ,slump ( 12 + 2) cm m³ 1.0000 Rp - Rp -
2 Besi U 24 (d8-150) kg 52.6667 Rp - Rp -
3 Pemasangan bekisting untuk plat lantai m² 5.0000 Rp - Rp -
Jumlah harga persatuan pekerjaan Rp -
19 1 m² Pemasangan Dinding Partisi Cemen Board 9 mm + Gypsum board 12 mm Rp 1,016,400.00
Bahan:
1 Pemasangan Dinding Partisi Cemen Board 9 mm + Gypsum board 12 mm m² 1.0500 Rp 880,000.00 Rp 924,000.00
- Panel semen board 9 mm
- Panel gypsum 12 mm
- Rangka C Chanel Stud 0,65 mm
- Aksesoris : sekrup, compund, dan tape
- Ongkos pasang dan material bantu
Jumlah harga persatuan pekerjaan Rp 924,000.00
Keuntungan+Over head 10% Rp 92,400.00
Total = Jumlah+(Keuntungan+Over head 10%) Rp 1,016,400.00
20 1 Hrf Pemasangan Signage Stainless Steel Tulisan Tinggi = 178 cm Rp 1,900,800.00
lengkap dengan rangka/ perkuatan dan alat bantu
Bahan:
1 Signage stainless steel grade SUS 304 cm 180.0000 Rp 8,000.00 Rp 1,440,000.00
2 Upah Pemasangan dan material bantu ls 1.0000 Rp 288,000.00 Rp 288,000.00
Jumlah harga persatuan pekerjaan Rp 1,728,000.00
Keuntungan+Over head 10% Rp 172,800.00
Total = Jumlah+(Keuntungan+Over head 10%) Rp 1,900,800.00
21 1 Hrf Pemasangan Signage Stainless Steel Tulisan Tinggi = 40 cm Rp 422,400.00
lengkap dengan rangka/ perkuatan dan alat bantu
Bahan:
1 Signage stainless steel grade SUS 304 cm 40.0000 Rp 8,000.00 Rp 320,000.00
2 Upah Pemasangan dan material bantu ls 1.0000 Rp 64,000.00 Rp 64,000.00
Jumlah harga persatuan pekerjaan Rp 384,000.00
Keuntungan+Over head 10% Rp 38,400.00
Total = Jumlah+(Keuntungan+Over head 10%) Rp 422,400.00
22 1 bh Pemasangan Logo/Lambang Stainless Steel Tebal 5 mm Rp 4,454,450.00
lengkap dengan rangka/ perkuatan dan alat bantu
Bahan:
1 Lambang Stainless steel tebal 5 mm SUS 316 cm 178.0000 Rp 17,500.00 Rp 3,115,000.00
2 Upah Pemasangan dan material bantu ls 1.0000 Rp 934,500.00 Rp 934,500.00
Jumlah harga persatuan pekerjaan Rp 4,049,500.00
Keuntungan+Over head 10% Rp 404,950.00
Total = Jumlah+(Keuntungan+Over head 10%) Rp 4,454,450.00
23 1 m² Pemasangan Floor Hardener t. 1,5 mm Rp -
Bahan:
1 Drymix floor hardener @ 25 kg kg 5.0000 Rp - Rp -
Tenaga Kerja:
1 Pekerja L.01 oh 0.1200 Rp - Rp -
2 Tukang batu L.02 oh 0.1200 Rp - Rp -
3 Kepala tukang L.03 oh 0.0120 Rp - Rp -
4 Mandor L.04 oh 0.0060 Rp - Rp -
Jumlah harga persatuan pekerjaan Rp -
Keuntungan+Over head 10% Rp -
Total = Jumlah+(Keuntungan+Over head 10%) Rp -
24 1 m² Pengecatan Dinding Weathershield (Eksterior) Rp -
Bahan :
1 Plamir (1 x Lapis) kg 0.1000 Rp - Rp -
2 Cat dasar (1 x Lapis) kg 0.1000 Rp - Rp -
3 Cat penutup (2 x lapis) kg 0.2600 Rp - Rp -

Analisa Harga Satuan Pek. Arsitektur - page 39 of 40


Tenaga Kerja :
1 Pekerja L.01 oh 0.0200 Rp - Rp -
2 Tukang cat L.02 oh 0.0630 Rp - Rp -
3 Kepala tukang L.03 oh 0.0063 Rp - Rp -
4 Mandor L.04 oh 0.0030 Rp - Rp -
Jumlah harga persatuan pekerjaan Rp -
Keuntungan+Over head 10% Rp -
Total = Jumlah+(Keuntungan+Over head 10%) Rp -
25 1 m² Pengecatan Dinding Dustrproof (Interior) Rp -
Bahan :
1 Plamir (1 x Lapis) kg 0.1000 Rp - Rp -
2 Cat dasar (1 x Lapis) kg 0.1000 Rp - Rp -
3 Cat penutup (2 x lapis) kg 0.2600 Rp - Rp -
Tenaga Kerja :
1 Pekerja L.01 oh 0.0200 Rp - Rp -
2 Tukang cat L.02 oh 0.0630 Rp - Rp -
3 Kepala tukang L.03 oh 0.0063 Rp - Rp -
4 Mandor L.04 oh 0.0030 Rp - Rp -
Jumlah harga persatuan pekerjaan Rp -
Keuntungan+Over head 10% Rp -
Total = Jumlah+(Keuntungan+Over head 10%) Rp -
26 1 m² Pengecatan Plafond Dustrproof (Interior) Rp -
Bahan :
1 Cat dasar (1 x Lapis) kg 0.1000 Rp - Rp -
2 Cat penutup (2 x lapis) kg 0.2600 Rp - Rp -
Tenaga Kerja :
1 Pekerja L.01 oh 0.0200 Rp - Rp -
2 Tukang cat L.02 oh 0.0630 Rp - Rp -
3 Kepala tukang L.03 oh 0.0063 Rp - Rp -
4 Mandor L.04 oh 0.0030 Rp - Rp -
Jumlah harga persatuan pekerjaan Rp -
Keuntungan+Over head 10% Rp -
Total = Jumlah+(Keuntungan+Over head 10%) Rp -
27 1 m² Pengecatan Plafond Weathershield (Eksterior) Rp -
Bahan :
1 Cat dasar (1 x Lapis) kg 0.1000 Rp - Rp -
2 Cat penutup (2 x lapis) kg 0.2600 Rp - Rp -
Tenaga Kerja :
1 Pekerja L.01 oh 0.0200 Rp - Rp -
2 Tukang cat L.02 oh 0.0630 Rp - Rp -
3 Kepala tukang L.03 oh 0.0063 Rp - Rp -
4 Mandor L.04 oh 0.0030 Rp - Rp -
Jumlah harga persatuan pekerjaan Rp -
Keuntungan+Over head 10% Rp -
Total = Jumlah+(Keuntungan+Over head 10%) Rp -
28 1 m' Pengecatan Plint Int Semi Gloss t. 10 cm Rp -
Bahan :
1 Plamir (1 x Lapis) kg 0.0111 Rp - Rp -
2 Cat dasar (1 x Lapis) kg 0.0111 Rp - Rp -
3 Cat penutup (2 x lapis) kg 0.0289 Rp - Rp -
Tenaga Kerja :
1 Pekerja L.01 oh 0.0089 Rp - Rp -
2 Tukang cat L.02 oh 0.0067 Rp - Rp -
3 Kepala tukang L.03 oh 0.0007 Rp - Rp -
4 Mandor L.04 oh 0.0004 Rp - Rp -
Jumlah harga persatuan pekerjaan Rp -
Keuntungan+Over head 10% Rp -
Total = Jumlah+(Keuntungan+Over head 10%) Rp -

Analisa Harga Satuan Pek. Arsitektur - page 40 of 40