Anda di halaman 1dari 113

RENCANA ANGGARAN BIAYA

" MEKANIKAL, ELEKTRIKAL & PLUMBING "

PROYEK

~ RUMAH SAKIT HERMINA ~


MALANG
RS. HERMINA MALANG
DAFTAR URAIAN PEKERJAAN (RENCANA ANGGARAN BIAYA)
PENJUMLAHAN TOTAL

PENJUMLAHAN TOTAL

I. PEKERJAAN LISTRIK Rp.


II. PEKERJAAN ELEKTRONIK FIRE ALARM Rp.
III. PEKERJAAN ELEKTRONIK TELEPHONE Rp.
IV. PEKERJAAN ELEKTRONIK DATA Rp.
V PEKERJAAN ELEKTRONIK TATA SUARA Rp.
VI PEKERJAAN ELEKTRONIK CCTV Rp.
VII PEKERJAAN ELEKTRONIK MATV Rp.
VIII PEKERJAAN ELEKTRONIK NURSE CALL Rp.
IX PEKERJAAN PLUMBING Rp.
X PEKERJAAN GAS MEDIS Rp.
XI PEKERJAAN PEMADAM KEBAKARAN Rp.
XII PEKERJAAN VENTILASI & AIR CONDITIONING Rp.
XIII PEKERJAAN VENTILASI & AIR CONDITIONING R. OK 0.00
XIV PEKERJAAN GENSET Rp.
XV PEKERJAAN LIFT SERVICE Rp.
XVI PEKERJAAN LIFT PENUMPANG Rp.

TOTAL Rp.

DIPINDAHKAN KE SURAT PENAWARAN


2,044,561,541.60

182,121,265.00

25,895,700.00

41,907,996.33

53,686,045.00

104,596,800.00

14,419,820.00

93,704,100.00

616,092,297.63

249,132,911.44

578,344,354.64

1,083,772,346.43

924,408,049.41

671,000,000.00

701,318,400.00

701,318,400.00

__________________
8,086,280,027.47
RENCANA ANGGARAN BIAYA

PROYEK : RS HERMINA
LOKASI : MALANG
PAKET : PEKERJAAN ELETRIKAL
TANGGAL : OKTOBER 2020

HARGA SATUAN JUMLAH


NO. URAIAN PEKERJAAN SAT VOL
MATERIAL JASA MATERIAL JASA

I PEKERJAAN LISTRIK POWER HOUSE


A PENYAMBUNGAN DAYA PLN
1. SAMBUNGAN DAYA PLN
- Biaya Tambah Daya KVA 345 Rp 1,250,000.00 Rp 431,250,000.00 Rp -
- Uang Jaminan Langganan (UJL) KVA 345 Rp 180,000.00 Rp 62,100,000.00 Rp - 0.8
- SLO Sertifikat Layak Operasi) KVA 345 Rp 200,000.00 Rp 69,000,000.00 Rp -
- Biaya Administrasi KVA 345 Rp 30,000.00 Rp 10,350,000.00 Rp -

Sub Total A Rp 572,700,000.00 Rp -

B PEKERJAAN DAN PEMASANGAN PANEL TEGANGAN MENENGAH

1 PANEL TEGANGAN MENENGAH (PTM) unit 1 Rp 240,000,000.00 Rp 12,500,000.00 Rp 240,000,000.00 Rp 12,500,000.00


Pengadaan Dan Pemasangan Panel Daya Listrik Harus Lengkap Berikut Dengan

- Pondasi Dan Dudukan Panel


- Accessories
- Incoming MV Cubicle 20 Kv LBS 630A
- Outcoming MV Cubicle 20 Kv LBS 630A
- Alat Bantu Lainnya
Sehingga Dapat Berfungsi Dengan Baik
Dan Dikerjakan Sesuai Gambar Perencana Dan Spesifikasi Teknis
2 TRAFO unit 1 Rp 130,000,000.00 Rp 8,500,000.00 Rp 130,000,000.00 Rp 8,500,000.00
- Kapasitas 630 Kva
- Lilitan CU (Tembaga)
- 20 Kv / 380 Volt
- Pemasangan Buzzer Indicator Heat Trafo
- Accessories
- Termasuk Kelengkapan Lainnya
Sehingga Dapat Berfungsi Dengan Baik
Dan Dikerjakan Sesuai Dengan Gambar Perencana Dan Spesifikasi Teknis

3 KABEL LADDER
- Dari PTM Ke Trafo m' 12 Rp 306,400.00 Rp 48,500.00 Rp 3,676,800.00 Rp 582,000.00
Ukuran 600 x 100 mm
- Dari Trafo Ke PUTR m' 10 Rp 306,400.00 Rp 48,500.00 Rp 3,064,000.00 Rp 485,000.00
Ukuran 600 x 100 mm

4 KABEL TRENCH UNTUK DUDUKAN KABEL + PENUTUP (DARI BETON)


- Dari Gardu PLN ke Ruang PTM m' 11 Rp 742,000.00 Rp 135,000.00 Rp 8,162,000.00 Rp 1,485,000.00
Ukuran 600 x 600 x 120 mm
Sub Total B Rp 384,902,800.00 Rp 23,552,000.00
C PEKERJAAN GROUNDING SYSTEM
1. Instalasi Grounding (Max 2 Ohm) Ke:
- Body Trafo d/Kabel BC 1 x 95 mm2 dlm PVC HI Conduit 1" m' 18 Rp 75,480.00 Rp 9,500.00 Rp 1,358,640.00 Rp 171,000.00
- Body PUTM d/Kabel BC 1 x 95 mm2 dlm PVC HI Conduit 1" m' 10 Rp 75,480.00 Rp 9,500.00 Rp 754,800.00 Rp 95,000.00
- Body PUTR d/Kabel BC 1 x 95 mm2 dlm PVC HI Conduit 1" m' 18 Rp 75,480.00 Rp 9,500.00 Rp 1,358,640.00 Rp 171,000.00
- Body Genset d/Kabel BC 1 x 95 mm2 dlm PVC HI Conduit 1" m' 11 Rp 75,480.00 Rp 9,500.00 Rp 830,280.00 Rp 104,500.00
2. Grounding Netral Trafo (Max 2 Ohm) Ke :
- Elektroda Cooper Rood 1"
- Bak Kontrol 400 x 400 x 400 mm Pasangan Bata + Penutup
- Kabel BC 1 x 95 mm2 + PVC HI Conduit 1" m' 12 Rp 5,893,680.00 Rp 1,473,500.00 Rp 70,724,160.00 Rp 17,682,000.00

3. Pengadaan Bak Kontrol 400 x 400 x 400 mm Pasangan Bata + Penutup Lot 1 Rp 3,600,000.00 Rp 450,000.00 Rp 3,600,000.00 Rp 450,000.00
Sub Total C Rp 78,626,520.00 Rp 18,673,500.00

D PEKERJAAN ELEKTRIKAL
2.1 PEKERJAAN ELEKTRIKAL
1 SDP-PP/LP unit 1 Rp 35,200,000.00 Rp 3,000,000.00 Rp 35,200,000.00 Rp 3,000,000.00
2 SDP-AC unit 1 Rp 20,727,137.60 Rp 2,900,000.00 Rp 20,727,137.60 Rp 2,900,000.00
3 SDP-UPS unit 1 Rp 8,800,000.00 Rp 1,000,000.00 Rp 8,800,000.00 Rp 1,000,000.00
4 SDP-UTILITAS unit 1 Rp 10,800,000.00 Rp 1,500,000.00 Rp 10,800,000.00 Rp 1,500,000.00
5 PP/LP-L1 unit 1 Rp 6,000,000.00 Rp 1,000,000.00 Rp 6,000,000.00 Rp 1,000,000.00
6 PP/LP-L2 unit 1 Rp 6,000,000.00 Rp 1,000,000.00 Rp 6,000,000.00 Rp 1,000,000.00
7 PP/LP-L3 unit 1 Rp 6,000,000.00 Rp 1,000,000.00 Rp 6,000,000.00 Rp 1,000,000.00
8 PP/LP-L4 unit 1 Rp 6,000,000.00 Rp 1,000,000.00 Rp 6,000,000.00 Rp 1,000,000.00
9 PP/LP-L5 unit 1 Rp 6,000,000.00 Rp 1,000,000.00 Rp 6,000,000.00 Rp 1,000,000.00
10 PP/LP-L6 unit 1 Rp 6,000,000.00 Rp 1,000,000.00 Rp 6,000,000.00 Rp 1,000,000.00
11 PP/LP-AC-L1 unit 1 Rp 20,000,000.00 Rp 9,900,000.00 Rp 20,000,000.00 Rp 9,900,000.00
12 PP/LP-AC-L2 unit 1 Rp 20,000,000.00 Rp 9,900,000.00 Rp 20,000,000.00 Rp 9,900,000.00
13 PP/LP-AC-L3 unit 1 Rp 20,000,000.00 Rp 9,900,000.00 Rp 20,000,000.00 Rp 9,900,000.00
14 PP/LP-AC-L4 unit 1 Rp 20,000,000.00 Rp 9,900,000.00 Rp 20,000,000.00 Rp 9,900,000.00
15 PP/LP-AC-L5 unit 1 Rp 20,000,000.00 Rp 9,900,000.00 Rp 20,000,000.00 Rp 9,900,000.00
16 PP/LP-AC-L6 unit 1 Rp 20,000,000.00 Rp 9,900,000.00 Rp 20,000,000.00 Rp 9,900,000.00
17 PP-OK-1 unit 1 Rp 10,160,000.00 Rp 1,500,000.00 Rp 10,160,000.00 Rp 1,500,000.00
18 PP-OK-2 unit 1 Rp 10,160,000.00 Rp 1,500,000.00 Rp 10,160,000.00 Rp 1,500,000.00
19 PP-NICU unit 1 Rp 10,160,000.00 Rp 1,500,000.00 Rp 10,160,000.00 Rp 1,500,000.00
20 PP-LIFT unit 1 Rp 4,400,000.00 Rp 750,000.00 Rp 4,400,000.00 Rp 750,000.00
21 PP-BOOSTER PUMP (Lantai Atap) unit 1 Rp 10,800,000.00 Rp 2,000,000.00 Rp 10,800,000.00 Rp 2,000,000.00
22 PP/LP-R. TRAFO unit 1 Rp 2,520,000.00 Rp 550,000.00 Rp 2,520,000.00 Rp 550,000.00
23 LP-PENERANGAN LUAR unit 1 Rp 2,520,000.00 Rp 550,000.00 Rp 2,520,000.00 Rp 550,000.00

JUMLAH PEKERJAAN PANEL LISTRIK Rp 282,247,137.60 Rp 82,150,000.00

1.2 PEKERJAAN KABEL FEEDER


E PEKERJAAN KABEL FEEDER
Pengkabelan antara pembagi daya dan / atau panel pembagi daya terpasang didalam saluran kabel atau
pada cable tray atau tangga kabel, lengkap rangka penguat dan penggantung dan material bantu lainnya

1 DARI Gardu PLN ke :


- PTM dengan/Kabel N2XSEFGbY 3x50 mm2 m' 50 Rp 895,200.00 Rp 303,800.00 Rp 44,760,000.00 Rp 15,190,000.00
2 DARI PTM ke :
- Trafo dengan/Kabel N2XSY 3x1Cx50 mm2 m' 15 Rp 986,400.00 Rp 246,000.00 Rp 14,796,000.00 Rp 3,690,000.00
3 DARI Trafo ke :
- PUTR dengan/Kabel NYY 2 (4x1cx300 mm2) (R,S, T, N) + 2Gx150 mm2 m' 20 Rp 4,374,400.00 Rp 246,000.00 Rp 87,488,000.00 Rp 4,920,000.00
4 Dari Genset dan PKG ke :
- PUTR NYY 2 (4x1Cx300) mm2 (RSTN) + 2G x 150 mm2 m' 30 Rp 3,574,400.00 Rp 246,000.00 Rp 107,232,000.00 Rp 7,380,000.00
5 Dari PHBUTR ke SDP-PInstalasi kabel daya_NYY 4x35 mm² + BC dia. 25 mm m' 30 Rp 257,066.67 Rp 38,560.00 Rp 7,712,000.00 Rp 1,156,800.00
6 Dari PHBUTR ke SDP-AInstalasi kabel daya_NYY 4x70 mm² + BC dia. 35 mm m' 30 Rp 474,666.67 Rp 71,200.00 Rp 14,240,000.00 Rp 2,136,000.00
7 Dari PHBUTR ke SDP-UInstalasi kabel daya_NYY 4x35 mm² + BC dia. 16 mm m' 30 Rp 246,400.00 Rp 36,960.00 Rp 7,392,000.00 Rp 1,108,800.00
8 Dari PHBUTR ke SDP-UInstalasi kabel daya_NYY 4x70 mm² + BC dia. 35 mm m' 25 Rp 474,666.67 Rp 71,200.00 Rp 11,866,666.67 Rp 1,780,000.00
9 Dari SDP-PP/LP ke PP/LP-Instalasi kabel daya_NYY 4x4 mm² + BC dia. 4mm m' 30 Rp 46,933.33 Rp 11,000.00 Rp 1,408,000.00 Rp 330,000.00
10 Dari SDP-PP/LP ke PP/LP-Instalasi kabel daya_NYY 4x4 mm² + BC dia. 4mm m' 35 Rp 46,933.33 Rp 11,000.00 Rp 1,642,666.67 Rp 385,000.00
11 Dari SDP-PP/LP ke PP/LP-Instalasi kabel daya_NYY 4x4 mm² + BC dia. 4mm m' 40 Rp 46,933.33 Rp 11,000.00 Rp 1,877,333.33 Rp 440,000.00
12 Dari SDP-PP/LP ke PP/LP-Instalasi kabel daya_NYY 4x4 mm² + BC dia. 4mm m' 45 Rp 46,933.33 Rp 11,000.00 Rp 2,112,000.00 Rp 495,000.00
13 Dari SDP-PP/LP ke PP/LP-Instalasi kabel daya_NYY 4x4 mm² + BC dia. 4mm m' 50 Rp 46,933.33 Rp 11,000.00 Rp 2,346,666.67 Rp 550,000.00
14 Dari SDP-PP/LP ke PP/LP-Instalasi kabel daya_NYY 4x4 mm² + BC dia. 4mm m' 65 Rp 46,933.33 Rp 11,000.00 Rp 3,050,666.67 Rp 715,000.00
15 Dari SDP-AC ke PP/LP-Instalasi kabel daya_NYY 4x4 mm² + BC dia. 4mm m' 30 Rp 46,933.33 Rp 11,000.00 Rp 1,408,000.00 Rp 330,000.00
16 Dari SDP-AC ke PP/LP-Instalasi kabel daya_NYY 4x4 mm² + BC dia. 4mm m' 25 Rp 46,933.33 Rp 11,000.00 Rp 1,173,333.33 Rp 275,000.00
17 Dari SDP-AC ke PP/LP-Instalasi kabel daya_NYY 4x4 mm² + BC dia. 4mm m' 30 Rp 46,933.33 Rp 11,000.00 Rp 1,408,000.00 Rp 330,000.00
18 Dari SDP-AC ke PP/LP-Instalasi kabel daya_NYY 4x4 mm² + BC dia. 4mm m' 35 Rp 46,933.33 Rp 11,000.00 Rp 1,642,666.67 Rp 385,000.00
19 Dari SDP-AC ke PP/LP-Instalasi kabel daya_NYY 4x4 mm² + BC dia. 4mm m' 40 Rp 46,933.33 Rp 11,000.00 Rp 1,877,333.33 Rp 440,000.00
20 Dari SDP-AC ke PP/LP-Instalasi kabel daya_NYY 4x4 mm² + BC dia. 4mm m' 45 Rp 46,933.33 Rp 11,000.00 Rp 2,112,000.00 Rp 495,000.00
21 Dari SDP-UPS ke PP-OKInstalasi kabel daya_NYY 4x4 mm² + BC dia. 4mm m' 50 Rp 46,933.33 Rp 11,000.00 Rp 2,346,666.67 Rp 550,000.00
22 Dari SDP-UPS ke PP-OKInstalasi kabel daya_NYY 4x4 mm² + BC dia. 4mm m' 50 Rp 46,933.33 Rp 11,000.00 Rp 2,346,666.67 Rp 550,000.00
23 Dari SDP-UPS ke PP-NI Instalasi kabel daya_NYY 4x4 mm² + BC dia. 4mm m' 50 Rp 46,933.33 Rp 11,000.00 Rp 2,346,666.67 Rp 550,000.00
24 Dari SDP-UTILITAS ke PP-LIFInstalasi kabel daya_NYY 4x6 mm² + BC dia. 6mm m' 35 Rp 75,733.33 Rp 11,360.00 Rp 2,650,666.67 Rp 397,600.00
25 Dari SDP-UTILITAS ke PP-BOO
Instalasi kabel daya_NYY 4x4 mm² + BC dia. 4mm m' 35 Rp 46,933.33 Rp 11,000.00 Rp 1,642,666.67 Rp 385,000.00
26 Dari SDP-UTILITAS ke PP/LP-Instalasi kabel daya_NYY 4x4 mm² + BC dia. 4mm m' 20 Rp 46,933.33 Rp 11,000.00 Rp 938,666.67 Rp 220,000.00
27 Dari SDP-UTILITAS ke LP-PEInstalasi kabel daya_NYY 4x4 mm² + BC dia. 4mm m' 20 Rp 46,933.33 Rp 11,000.00 Rp 938,666.67 Rp 220,000.00

JUMLAH PEKERJAAN KABEL FEEDER Rp 76,480,000.00 Rp 14,224,200.00


G PENGADAAN & PEMASANGAN LAMPU+ARMATURE,SAKLAR & STOP KONTAK
INSTALASI PENERANGAN DAN KOTAK KONTAK LANTAI 1
1 LED Down Light 9 W set 14 Rp 107,200.00 Rp 14,292.00 Rp 1,500,800.00 Rp 200,088.00
2 LED Down Light 9 W + Nicad Battery set 0 Rp 655,200.00 Rp 72,972.00 Rp - Rp -
3 LED Down Light 13 W set 0 Rp 154,400.00 Rp 20,644.00 Rp - Rp -
4 LED Down Light 13 W + Nicad Battery set 0 Rp 702,400.00 Rp 105,404.00 Rp - Rp -
5 Exit Lamp 10 Watt set 4 Rp 683,200.00 Rp 139,600.00 Rp 2,732,800.00 Rp 558,400.00
6 Lampu LED T8 20 W Batten set 26 Rp 258,400.00 Rp 80,950.00 Rp 6,718,400.00 Rp 2,104,700.00
7 Lampu LED T8 20 W Batten + Nicad Battery set 10 Rp 1,033,600.00 Rp 155,040.00 Rp 10,336,000.00 Rp 1,550,400.00
8 Pekerjaan instalasi penerangan_NYM 3x2.5 mm² titik 54 Rp 202,000.00 Rp 50,500.00 Rp 10,908,000.00 Rp 2,727,000.00
9 Stop kontak 1 Phasa titik 5 Rp 28,000.00 Rp 20,500.00 Rp 140,000.00 Rp 102,500.00
10 Pekerjaan instalasi stop kontak dan daya_NYM 3x2.5 mm² titik 5 Rp 242,080.00 Rp 52,900.00 Rp 1,210,400.00 Rp 264,500.00

JUMLAH INSTALASI PENERANGAN DAN KOTAK KONTAK LANTAI 1 Rp 33,546,400.00 Rp 7,507,588.00

INSTALASI PENERANGAN DAN KOTAK KONTAK LANTAI 2


1 LED Down Light 9 W set 0 Rp 107,200.00 Rp 14,292.00 Rp - Rp -
2 LED Down Light 9 W + Nicad Battery set 0 Rp 655,200.00 Rp 72,972.00 Rp - Rp -
3 LED Down Light 13 W set 0 Rp 154,400.00 Rp 20,644.00 Rp - Rp -
4 LED Down Light 13 W + Nicad Battery set 0 Rp 702,400.00 Rp 105,404.00 Rp - Rp -
5 Exit Lamp 10 Watt set 4 Rp 683,200.00 Rp 139,600.00 Rp 2,732,800.00 Rp 558,400.00
6 Lampu LED T8 20 W Batten set 60 Rp 420,160.00 Rp 80,950.00 Rp 25,209,600.00 Rp 4,857,000.00
7 Lampu LED T8 20 W Batten + Nicad Battery set 15 Rp 1,033,600.00 Rp 155,040.00 Rp 15,504,000.00 Rp 2,325,600.00
8 Pekerjaan instalasi penerangan_NYM 3x2.5 mm² titik 79 Rp 202,000.00 Rp 50,500.00 Rp 15,958,000.00 Rp 3,989,500.00
9 Stop kontak 1 Phasa titik 5 Rp 28,000.00 Rp 20,500.00 Rp 140,000.00 Rp 102,500.00
10 Pekerjaan instalasi stop kontak dan daya_NYM 3x2.5 mm² titik 5 Rp 242,080.00 Rp 52,900.00 Rp 1,210,400.00 Rp 264,500.00

JUMLAH INSTALASI PENERANGAN DAN KOTAK KONTAK LANTAI 2 Rp 60,754,800.00 Rp 12,097,500.00

INSTALASI PENERANGAN DAN KOTAK KONTAK LANTAI 3


1 LED Down Light 9 W set 66 Rp 107,200.00 Rp 14,292.00 Rp 7,075,200.00 Rp 943,272.00
2 LED Down Light 9 W + Nicad Battery set 16 Rp 655,200.00 Rp 72,972.00 Rp 10,483,200.00 Rp 1,167,552.00
3 LED Down Light 13 W set 0 Rp 154,400.00 Rp 20,644.00 Rp - Rp -
4 LED Down Light 13 W + Nicad Battery set 0 Rp 702,400.00 Rp 105,404.00 Rp - Rp -
5 Exit Lamp 10 Watt set 4 Rp 683,200.00 Rp 139,600.00 Rp 2,732,800.00 Rp 558,400.00
6 Lampu LED T8 20 W Batten set 0 Rp 420,160.00 Rp 80,950.00 Rp - Rp -
7 Lampu LED T8 20 W Batten + Nicad Battery set 2 Rp 1,033,600.00 Rp 155,040.00 Rp 2,067,200.00 Rp 310,080.00
8 Pekerjaan instalasi penerangan_NYM 3x2.5 mm² titik 88 Rp 202,000.00 Rp 50,500.00 Rp 17,776,000.00 Rp 4,444,000.00
9 Lampu Operasi 1000 Watt titik 2 Rp 84,000,000.00 Rp 12,600,000.00 Rp 168,000,000.00 Rp 25,200,000.00
10 Stop kontak 1 Phasa titik 4 Rp 28,000.00 Rp 20,500.00 Rp 112,000.00 Rp 82,000.00
11 Pekerjaan instalasi stop kontak dan daya_NYM 3x2.5 mm² titik 4 Rp 242,080.00 Rp 52,900.00 Rp 968,320.00 Rp 211,600.00

JUMLAH INSTALASI PENERANGAN DAN KOTAK KONTAK LANTAI 3 Rp 209,214,720.00 Rp 32,916,904.00

INSTALASI PENERANGAN DAN KOTAK KONTAK LANTAI 4


1 LED Down Light 9 W set 77 Rp 107,200.00 Rp 14,292.00 Rp 8,254,400.00 Rp 1,100,484.00
2 LED Down Light 9 W + Nicad Battery set 16 Rp 655,200.00 Rp 72,972.00 Rp 10,483,200.00 Rp 1,167,552.00
3 LED Down Light 13 W set 0 Rp 154,400.00 Rp 20,644.00 Rp - Rp -
4 LED Down Light 13 W + Nicad Battery set 0 Rp 702,400.00 Rp 105,404.00 Rp - Rp -
5 Exit Lamp 10 Watt set 4 Rp 683,200.00 Rp 139,600.00 Rp 2,732,800.00 Rp 558,400.00
6 Lampu LED T8 20 W Batten set 0 Rp 420,160.00 Rp 80,950.00 Rp - Rp -
7 Lampu LED T8 20 W Batten + Nicad Battery set 2 Rp 1,033,600.00 Rp 155,040.00 Rp 2,067,200.00 Rp 310,080.00
8 Pekerjaan instalasi penerangan_NYM 3x2.5 mm² titik 99 Rp 202,000.00 Rp 50,500.00 Rp 19,998,000.00 Rp 4,999,500.00
8 Stop kontak 1 Phasa titik 10 Rp 28,000.00 Rp 20,500.00 Rp 280,000.00 Rp 205,000.00
9 Pekerjaan instalasi stop kontak dan daya_NYM 3x2.5 mm² titik 10 Rp 242,080.00 Rp 52,900.00 Rp 2,420,800.00 Rp 529,000.00
Rp -
JUMLAH INSTALASI PENERANGAN DAN KOTAK KONTAK LANTAI 4 Rp 46,236,400.00 Rp 8,870,016.00
Rp -
INSTALASI PENERANGAN DAN KOTAK KONTAK LANTAI 5 Rp -
1 LED Down Light 9 W set 62 Rp 107,200.00 Rp 14,292.00 Rp 6,646,400.00 Rp 886,104.00
2 LED Down Light 9 W + Nicad Battery set 16 Rp 655,200.00 Rp 72,972.00 Rp 10,483,200.00 Rp 1,167,552.00
3 LED Down Light 13 W set 0 Rp 154,400.00 Rp 20,644.00 Rp - Rp -
4 LED Down Light 13 W + Nicad Battery set 0 Rp 702,400.00 Rp 105,404.00 Rp - Rp -
5 Exit Lamp 10 Watt set 4 Rp 683,200.00 Rp 139,600.00 Rp 2,732,800.00 Rp 558,400.00
6 Lampu LED T8 20 W Batten set 0 Rp 420,160.00 Rp 80,950.00 Rp - Rp -
7 Lampu LED T8 20 W Batten + Nicad Battery set 2 Rp 1,033,600.00 Rp 155,040.00 Rp 2,067,200.00 Rp 310,080.00
8 Pekerjaan instalasi penerangan_NYM 3x2.5 mm² titik 84 Rp 202,000.00 Rp 50,500.00 Rp 16,968,000.00 Rp 4,242,000.00
9 Stop kontak 1 Phasa titik 10 Rp 28,000.00 Rp 20,500.00 Rp 280,000.00 Rp 205,000.00
10 Pekerjaan instalasi stop kontak dan daya_NYM 3x2.5 mm² titik 10 Rp 242,080.00 Rp 52,900.00 Rp 2,420,800.00 Rp 529,000.00

JUMLAH INSTALASI PENERANGAN DAN KOTAK KONTAK LANTAI 5 Rp 41,598,400.00 Rp 7,898,136.00

INSTALASI PENERANGAN DAN KOTAK KONTAK LANTAI 6


1 LED Down Light 9 W set 60 Rp 107,200.00 Rp 14,292.00 Rp 6,432,000.00 Rp 857,520.00
2 LED Down Light 9 W + Nicad Battery set 10 Rp 655,200.00 Rp 72,972.00 Rp 6,552,000.00 Rp 729,720.00
3 LED Down Light 13 W set 0 Rp 154,400.00 Rp 20,644.00 Rp - Rp -
4 LED Down Light 13 W + Nicad Battery set 0 Rp 702,400.00 Rp 105,404.00 Rp - Rp -
5 Exit Lamp 10 Watt set 4 Rp 683,200.00 Rp 139,600.00 Rp 2,732,800.00 Rp 558,400.00
6 Lampu LED T8 20 W Batten set 0 Rp 420,160.00 Rp 80,950.00 Rp - Rp -
7 Lampu LED T8 20 W Batten + Nicad Battery set 2 Rp 1,033,600.00 Rp 155,040.00 Rp 2,067,200.00 Rp 310,080.00
8 Pekerjaan instalasi penerangan_NYM 3x2.5 mm² titik 76 Rp 202,000.00 Rp 50,500.00 Rp 15,352,000.00 Rp 3,838,000.00
9 Stop kontak 1 Phasa titik 10 Rp 28,000.00 Rp 20,500.00 Rp 280,000.00 Rp 205,000.00
10 Pekerjaan instalasi stop kontak dan daya_NYM 3x2.5 mm² titik 10 Rp 242,080.00 Rp 52,900.00 Rp 2,420,800.00 Rp 529,000.00

JUMLAH INSTALASI PENERANGAN DAN KOTAK KONTAK LANTAI 6 Rp 35,836,800.00 Rp 7,027,720.00

I TESTING & COMMISSIONING Lot 1 Rp 7,500,000.00 Rp - Rp 7,500,000.00

Sub Total H Rp - Rp 7,500,000.00


TOTAL PEKERJAAN LIS Rp 1,822,143,977.60 Rp 222,417,564.00

GRAND TOTAL PEKERJA Rp 2,044,561,541.60


RENCANA ANGGARAN BIAYA

PROYEK : RS HERMINA
LOKASI : MALANG
PAKET : PEKERJAAN ELETRIKAL
TANGGAL : OKTOBER 2020

HARGA SATUAN JUMLAH


No. URAIAN PEKERJAAN SAT VOL
MATERIAL UPAH MATERIAL UPAH

II PEKERJAAN FIRE ALARM

1. PERALATAN UTAMA (Existing)


"Peralatan Utama Fire Alarm menggunakan Existing"

2. TERMINAL BOX

"Terminal Box Fire Alarm menggunakan Existing"

3. KABEL FEEDER UTAMA

Dari MCP-FA ke :
"Kabel Feeder Utama Fire Alarm menggunakan Existing" m' 15 30,875 4,600 463,125 69,000

4. PENGADAAN & PEMASANGAN ARMATURE


a LANTAI 1
- Smoke Detector bh 16 308,750 19,500 4,940,000 312,000
- Instalasi titik Smoke Detector d/kabel NYA 2x(1x1,5 mm2) dlm PVC HI Conduit 20 mm2 titik 16 232,370 39,000 3,717,920 624,000

- LED Indikator bh 1 82,745 19,500 82,745 19,500


- Instalasi titik LED Indikator d/kabel TITC 2x(2x0,6 mm2) dlm PVC HI Conduit 20 mm2 titik 1 154,375 39,000 154,375 39,000

- Heat Detector (ROR) bh 1 228,475 19,500 228,475 19,500


- Instalasi titik Heat Detector (ROR) d/kabel NYA 2x(1x1,5 mm2) dlm PVC HI Conduit 20 mm2 titik 1 232,370 39,000 232,370 39,000

- Instalasi Manual Push Button d/kabel FRC 3x1,5 mm2 dlm PVC HI Conduit 20 mm2 titik 1 605,435 39,000 605,435 39,000

- Instalasi Alarm Bell d/kabel FRC 3x1,5 mm dlm PVC HI Conduit 20 mm


2 2 titik 1 605,435 39,000 605,435 39,000

- Instalasi Indicator Lamp d/kabel FRC 3x1,5 mm2 dlm PVC HI Conduit 20 mm2 titik 1 605,435 39,000 605,435 39,000

- Instalasi Jack Intercome d/kabel FRC 3x1,5 mm2 dlm PVC HI Conduit 20 mm2 titik 1 605,435 39,000 605,435 39,000

- Instalasi Flow Switch d/kabel FRC 3x1,5 mm dlm PVC HI Conduit 20 mm


2 2 titik 1 605,435 39,000 605,435 39,000

- Instalasi Temper Switch d/kabel FRC 3x1,5 mm2 dlm PVC HI Conduit 20 mm2 titik 1 605,435 39,000 605,435 39,000

- Instalasi Supply Exhaust Fan d/kabel FRC 3x1,5 mm2 dlm PVC HI Conduit 20 mm2 titik 1 605,435 39,000 605,435 39,000

- Instalasi Panel AC d/kabel FRC 3x1,5 mm dlm PVC HI Conduit 20 mm


2 2 titik 1 605,435 39,000 605,435 39,000

Page 6
- Instalasi Panel Exhaust Fan d/kabel FRC 3x1,5 mm2 dlm PVC HI Conduit 20 mm2 titik 1 605,435 39,000 605,435 39,000

- Instalasi Panel Listrik d/kabel FRC 3x1,5 mm2 dlm PVC HI Conduit 20 mm2 titik 1 605,435 39,000 605,435 39,000

- Instalasi Panel Hydrant d/kabel FRC 3x1,5 mm2 dlm PVC HI Conduit 20 mm2 titik 1 605,435 39,000 605,435 39,000

- Instalasi Panel Kontrol Genset d/kabel FRC 3x1,5 mm dlm PVC HI Conduit 20 mm
2 2 titik 1 605,435 39,000 605,435 39,000

- End Of Line Bh 1 154,375 19,500 154,375 19,500


b LANTAI 2
- Smoke Detector bh 8 308,750 19,500 2,470,000 156,000
- Instalasi titik Smoke Detector d/kabel NYA 2x(1x1,5 mm2) dlm PVC HI Conduit 20 mm2 titik 8 232,370 39,000 1,858,960 312,000

- LED Indikator bh 1 82,745 19,500 82,745 19,500


- Instalasi titik LED Indikator d/kabel TITC 2x(2x0,6 mm2) dlm PVC HI Conduit 20 mm2 titik 1 154,375 39,000 154,375 39,000

- Heat Detector (ROR) bh 0 228,475 19,500 - -


- Instalasi titik Heat Detector (ROR) d/kabel NYA 2x(1x1,5 mm2) dlm PVC HI Conduit 20 mm2 titik 0 232,370 39,000 - -

- Instalasi Manual Push Button d/kabel FRC 3x1,5 mm2 dlm PVC HI Conduit 20 mm2 titik 1 605,435 39,000 605,435 39,000

- Instalasi Alarm Bell d/kabel FRC 3x1,5 mm dlm PVC HI Conduit 20 mm


2 2 titik 1 605,435 39,000 605,435 39,000

- Instalasi Indicator Lamp d/kabel FRC 3x1,5 mm dlm PVC HI Conduit 20 mm


2 2 titik 1 605,435 39,000 605,435 39,000

- Instalasi Jack Intercome d/kabel FRC 3x1,5 mm2 dlm PVC HI Conduit 20 mm2 titik 1 605,435 39,000 605,435 39,000

- Instalasi Flow Switch d/kabel FRC 3x1,5 mm dlm PVC HI Conduit 20 mm


2 2 titik 1 605,435 39,000 605,435 39,000

- Instalasi Temper Switch d/kabel FRC 3x1,5 mm dlm PVC HI Conduit 20 mm


2 2 titik 1 605,435 39,000 605,435 39,000

- Instalasi Supply Exhaust Fan d/kabel FRC 3x1,5 mm2 dlm PVC HI Conduit 20 mm2 titik 1 605,435 39,000 605,435 39,000

- Instalasi Panel AC d/kabel FRC 3x1,5 mm dlm PVC HI Conduit 20 mm


2 2 titik 1 605,435 39,000 605,435 39,000

- Instalasi Panel Exhaust Fan d/kabel FRC 3x1,5 mm dlm PVC HI Conduit 20 mm
2 2 titik 1 605,435 39,000 605,435 39,000

- Instalasi Panel Listrik d/kabel FRC 3x1,5 mm2 dlm PVC HI Conduit 20 mm2 titik 1 605,435 39,000 605,435 39,000

- Instalasi Panel Hydrant d/kabel FRC 3x1,5 mm2 dlm PVC HI Conduit 20 mm2 titik 1 605,435 39,000 605,435 39,000

- Instalasi Panel Kontrol Genset d/kabel FRC 3x1,5 mm dlm PVC HI Conduit 20 mm
2 2 titik 1 605,435 39,000 605,435 39,000

- End Of Line Bh 1 154,375 19,500 154,375 19,500


c LANTAI 3
- Smoke Detector bh 19 308,750 19,500 5,866,250 370,500
- Instalasi titik Smoke Detector d/kabel NYA 2x(1x1,5 mm2) dlm PVC HI Conduit 20 mm2 titik 19 232,370 39,000 4,415,030 741,000

- Heat Detector (ROR) bh 0 228,475 19,500 - -


- Instalasi titik Heat Detector (ROR) d/kabel NYA 2x(1x1,5 mm2) dlm PVC HI Conduit 20 mm2 titik 0 232,370 39,000 - -

- Gas Detector bh 1 12,447,500 1,625,000 12,447,500 1,625,000


- Instalasi titik Fixed Temp. Heat Detector d/kabel NYA 2x(1x1,5 mm2) dlm PVC HI Conduit 20 mm2 titik 1 244,600 39,000 244,600 39,000

- LED Indikator bh 1 82,745 19,500 82,745 19,500


- Instalasi titik LED Indikator d/kabel NYA 2x(1x1,5 mm2) dlm PVC HI Conduit 20 mm2 titik 1 154,375 39,000 154,375 39,000

- Instalasi Manual Push Button d/kabel FRC 3x1,5 mm2 dlm PVC HI Conduit 20 mm2 titik 1 605,435 39,000 605,435 39,000

- Instalasi Alarm Bell d/kabel FRC 3x1,5 mm dlm PVC HI Conduit 20 mm


2 2 titik 1 605,435 39,000 605,435 39,000

- Instalasi Indicator Lamp d/kabel FRC 3x1,5 mm2 dlm PVC HI Conduit 20 mm2 titik 1 605,435 39,000 605,435 39,000

- Instalasi Jack Intercome d/kabel FRC 3x1,5 mm dlm PVC HI Conduit 20 mm


2 2 titik 1 605,435 39,000 605,435 39,000

- Instalasi Flow Switch d/kabel FRC 3x1,5 mm dlm PVC HI Conduit 20 mm


2 2 titik 1 605,435 39,000 605,435 39,000

- Instalasi Temper Switch d/kabel FRC 3x1,5 mm2 dlm PVC HI Conduit 20 mm2 titik 1 605,435 39,000 605,435 39,000

- Instalasi Supply Exhaust Fan d/kabel FRC 3x1,5 mm2 dlm PVC HI Conduit 20 mm2 titik 1 605,435 39,000 605,435 39,000

- Instalasi Panel AC d/kabel FRC 3x1,5 mm dlm PVC HI Conduit 20 mm


2 2 titik 1 605,435 39,000 605,435 39,000

- Instalasi Panel Exhaust Fan d/kabel FRC 3x1,5 mm2 dlm PVC HI Conduit 20 mm2 titik 1 605,435 39,000 605,435 39,000

- Instalasi Panel Listrik d/kabel FRC 3x1,5 mm2 dlm PVC HI Conduit 20 mm2 titik 1 605,435 39,000 605,435 39,000

- Instalasi Panel Hydrant d/kabel FRC 3x1,5 mm dlm PVC HI Conduit 20 mm


2 2 titik 1 605,435 39,000 605,435 39,000

- Instalasi Panel Kontrol Genset d/kabel FRC 3x1,5 mm dlm PVC HI Conduit 20 mm
2 2 titik 1 605,435 39,000 605,435 39,000

- End Of Line Bh 1 154,375 19,500 154,375 19,500


d LANTAI 4
- Smoke Detector bh 14 308,750 19,500 4,322,500 273,000
- Instalasi titik Smoke Detector d/kabel NYA 2x(1x1,5 mm2) dlm PVC HI Conduit 20 mm2 titik 14 232,370 39,000 3,253,180 546,000

- Heat Detector (ROR) bh 0 228,475 19,500 - -


- Instalasi titik Heat Detector (ROR) d/kabel NYA 2x(1x1,5 mm2) dlm PVC HI Conduit 20 mm2 titik 0 232,370 39,000 - -

- LED Indikator bh 1 82,745 19,500 82,745 19,500


- Instalasi titik LED Indikator d/kabel NYA 2x(1x1,5 mm2) dlm PVC HI Conduit 20 mm2 titik 1 154,375 39,000 154,375 39,000

- Instalasi Manual Push Button d/kabel FRC 3x1,5 mm2 dlm PVC HI Conduit 20 mm2 titik 1 605,435 39,000 605,435 39,000

- Instalasi Alarm Bell d/kabel FRC 3x1,5 mm dlm PVC HI Conduit 20 mm


2 2 titik 1 605,435 39,000 605,435 39,000

- Instalasi Indicator Lamp d/kabel FRC 3x1,5 mm2 dlm PVC HI Conduit 20 mm2 titik 1 605,435 39,000 605,435 39,000

- Instalasi Jack Intercome d/kabel FRC 3x1,5 mm2 dlm PVC HI Conduit 20 mm2 titik 1 605,435 39,000 605,435 39,000

- Instalasi Flow Switch d/kabel FRC 3x1,5 mm dlm PVC HI Conduit 20 mm


2 2 titik 1 605,435 39,000 605,435 39,000

- Instalasi Temper Switch d/kabel FRC 3x1,5 mm2 dlm PVC HI Conduit 20 mm2 titik 1 605,435 39,000 605,435 39,000

- Instalasi Supply Exhaust Fan d/kabel FRC 3x1,5 mm2 dlm PVC HI Conduit 20 mm2 titik 1 605,435 39,000 605,435 39,000

Page 7
- Instalasi Panel AC d/kabel FRC 3x1,5 mm2 dlm PVC HI Conduit 20 mm2 titik 1 605,435 39,000 605,435 39,000

- Instalasi Panel Exhaust Fan d/kabel FRC 3x1,5 mm2 dlm PVC HI Conduit 20 mm2 titik 1 605,435 39,000 605,435 39,000

- Instalasi Panel Listrik d/kabel FRC 3x1,5 mm2 dlm PVC HI Conduit 20 mm2 titik 1 605,435 39,000 605,435 39,000

- Instalasi Panel Hydrant d/kabel FRC 3x1,5 mm dlm PVC HI Conduit 20 mm


2 2 titik 1 605,435 39,000 605,435 39,000

- Instalasi Panel Kontrol Genset d/kabel FRC 3x1,5 mm2 dlm PVC HI Conduit 20 mm2 titik 1 605,435 39,000 605,435 39,000

- End Of Line Bh 19 154,375 19,500 2,933,125 370,500

d LANTAI 4
- Smoke Detector bh 23 308,750 19,500 7,101,250 448,500
- Instalasi titik Smoke Detector d/kabel NYA 2x(1x1,5 mm2) dlm PVC HI Conduit 20 mm2 titik 23 232,370 39,000 5,344,510 897,000
- -
- Heat Detector (ROR) bh 2 228,475 19,500 456,950 39,000
- Instalasi titik Heat Detector (ROR) d/kabel NYA 2x(1x1,5 mm2) dlm PVC HI Conduit 20 mm2 titik 2 232,370 39,000 464,740 78,000
- -
- LED Indikator bh 12 82,745 19,500 992,940 234,000
- Instalasi titik LED Indikator d/kabel NYA 2x(1x1,5 mm2) dlm PVC HI Conduit 20 mm2 titik 12 154,375 39,000 1,852,500 468,000
- -
- Instalasi Manual Push Button d/kabel FRC 3x1,5 mm2 dlm PVC HI Conduit 20 mm2 titik 2 605,435 39,000 1,210,870 78,000
- -
- Instalasi Alarm Bell d/kabel FRC 3x1,5 mm dlm PVC HI Conduit 20 mm
2 2 titik 2 605,435 39,000 1,210,870 78,000
- -
- Instalasi Indicator Lamp d/kabel FRC 3x1,5 mm2 dlm PVC HI Conduit 20 mm2 titik 2 605,435 39,000 1,210,870 78,000
- -
- Instalasi Jack Intercome d/kabel FRC 3x1,5 mm dlm PVC HI Conduit 20 mm
2 2 titik 2 605,435 39,000 1,210,870 78,000
- -
- Instalasi Flow Switch d/kabel FRC 3x1,5 mm dlm PVC HI Conduit 20 mm
2 2 titik 1 605,435 39,000 605,435 39,000
- -
- Instalasi Temper Switch d/kabel FRC 3x1,5 mm2 dlm PVC HI Conduit 20 mm2 titik 1 605,435 39,000 605,435 39,000
- -
- Instalasi Supply Exhaust Fan d/kabel FRC 3x1,5 mm dlm PVC HI Conduit 20 mm
2 2 titik 1 605,435 39,000 605,435 39,000
- -
- Instalasi Panel AC d/kabel FRC 3x1,5 mm dlm PVC HI Conduit 20 mm
2 2 titik 1 605,435 39,000 605,435 39,000
- -
- Instalasi Panel Exhaust Fan d/kabel FRC 3x1,5 mm2 dlm PVC HI Conduit 20 mm2 titik 1 605,435 39,000 605,435 39,000
- -
- Instalasi Panel Listrik d/kabel FRC 3x1,5 mm2 dlm PVC HI Conduit 20 mm2 titik 1 605,435 39,000 605,435 39,000
- -
- Instalasi Panel Hydrant d/kabel FRC 3x1,5 mm dlm PVC HI Conduit 20 mm
2 2 titik 1 605,435 39,000 605,435 39,000
- -
- Instalasi Panel Kontrol Genset d/kabel FRC 3x1,5 mm2 dlm PVC HI Conduit 20 mm2 titik 1 605,435 39,000 605,435 39,000
- -
- End Of Line Bh 19 154,375 19,500 2,933,125 370,500

e LANTAI 5
- Smoke Detector bh 15 308,750 19,500 4,631,250 292,500
- Instalasi titik Smoke Detector d/kabel NYA 2x(1x1,5 mm2) dlm PVC HI Conduit 20 mm2 titik 15 232,370 39,000 3,485,550 585,000
- -
- Heat Detector (ROR) bh 0 228,475 19,500 - -
- Instalasi titik Heat Detector (ROR) d/kabel NYA 2x(1x1,5 mm2) dlm PVC HI Conduit 20 mm2 titik 0 232,370 39,000 - -
- -
- LED Indikator bh 1 82,745 19,500 82,745 19,500
- Instalasi titik LED Indikator d/kabel NYA 2x(1x1,5 mm2) dlm PVC HI Conduit 20 mm2 titik 1 154,375 39,000 154,375 39,000
- -
- Instalasi Manual Push Button d/kabel FRC 3x1,5 mm2 dlm PVC HI Conduit 20 mm2 titik 1 605,435 39,000 605,435 39,000
- -
- Instalasi Alarm Bell d/kabel FRC 3x1,5 mm dlm PVC HI Conduit 20 mm
2 2 titik 1 605,435 39,000 605,435 39,000
- -
- Instalasi Indicator Lamp d/kabel FRC 3x1,5 mm2 dlm PVC HI Conduit 20 mm2 titik 1 605,435 39,000 605,435 39,000
- -
- Instalasi Jack Intercome d/kabel FRC 3x1,5 mm dlm PVC HI Conduit 20 mm
2 2 titik 1 605,435 39,000 605,435 39,000
- -
- Instalasi Flow Switch d/kabel FRC 3x1,5 mm dlm PVC HI Conduit 20 mm
2 2 titik 1 605,435 39,000 605,435 39,000
- -
- Instalasi Temper Switch d/kabel FRC 3x1,5 mm2 dlm PVC HI Conduit 20 mm2 titik 1 605,435 39,000 605,435 39,000
- -
- Instalasi Supply Exhaust Fan d/kabel FRC 3x1,5 mm2 dlm PVC HI Conduit 20 mm2 titik 1 605,435 39,000 605,435 39,000
- -
- Instalasi Panel AC d/kabel FRC 3x1,5 mm dlm PVC HI Conduit 20 mm
2 2 titik 1 605,435 39,000 605,435 39,000
- -
- Instalasi Panel Exhaust Fan d/kabel FRC 3x1,5 mm2 dlm PVC HI Conduit 20 mm2 titik 1 605,435 39,000 605,435 39,000
- -
- Instalasi Panel Listrik d/kabel FRC 3x1,5 mm2 dlm PVC HI Conduit 20 mm2 titik 1 605,435 39,000 605,435 39,000
- -
- Instalasi Panel Hydrant d/kabel FRC 3x1,5 mm dlm PVC HI Conduit 20 mm
2 2 titik 1 605,435 39,000 605,435 39,000
- -
- Instalasi Panel Kontrol Genset d/kabel FRC 3x1,5 mm2 dlm PVC HI Conduit 20 mm2 titik 1 605,435 39,000 605,435 39,000
- -
- End Of Line Bh 19 154,375 19,500 2,933,125 370,500

f LANTAI 6
- Smoke Detector bh 17 308,750 19,500 5,248,750 331,500
- Instalasi titik Smoke Detector d/kabel NYA 2x(1x1,5 mm2) dlm PVC HI Conduit 20 mm2 titik 17 232,370 39,000 3,950,290 663,000
- -
- Heat Detector (ROR) bh 0 228,475 19,500 - -
- Instalasi titik Heat Detector (ROR) d/kabel NYA 2x(1x1,5 mm2) dlm PVC HI Conduit 20 mm2 titik 0 232,370 39,000 - -
- -
- LED Indikator bh 1 82,745 19,500 82,745 19,500
- Instalasi titik LED Indikator d/kabel NYA 2x(1x1,5 mm2) dlm PVC HI Conduit 20 mm2 titik 1 154,375 39,000 154,375 39,000
- -
- Instalasi Manual Push Button d/kabel FRC 3x1,5 mm2 dlm PVC HI Conduit 20 mm2 titik 1 605,435 39,000 605,435 39,000
- -
- Instalasi Alarm Bell d/kabel FRC 3x1,5 mm dlm PVC HI Conduit 20 mm
2 2 titik 1 605,435 39,000 605,435 39,000
- -
- Instalasi Indicator Lamp d/kabel FRC 3x1,5 mm2 dlm PVC HI Conduit 20 mm2 titik 1 605,435 39,000 605,435 39,000
- -
- Instalasi Jack Intercome d/kabel FRC 3x1,5 mm dlm PVC HI Conduit 20 mm
2 2 titik 1 605,435 39,000 605,435 39,000
- -
- Instalasi Flow Switch d/kabel FRC 3x1,5 mm dlm PVC HI Conduit 20 mm
2 2 titik 1 605,435 39,000 605,435 39,000
- -
- Instalasi Temper Switch d/kabel FRC 3x1,5 mm2 dlm PVC HI Conduit 20 mm2 titik 1 605,435 39,000 605,435 39,000
- -
- Instalasi Supply Exhaust Fan d/kabel FRC 3x1,5 mm2 dlm PVC HI Conduit 20 mm2 titik 1 605,435 39,000 605,435 39,000
- -
- Instalasi Panel AC d/kabel FRC 3x1,5 mm dlm PVC HI Conduit 20 mm
2 2 titik 1 605,435 39,000 605,435 39,000
- -
- Instalasi Panel Exhaust Fan d/kabel FRC 3x1,5 mm2 dlm PVC HI Conduit 20 mm2 titik 1 605,435 39,000 605,435 39,000
- -
- Instalasi Panel Listrik d/kabel FRC 3x1,5 mm2 dlm PVC HI Conduit 20 mm2 titik 1 605,435 39,000 605,435 39,000
- -
- Instalasi Panel Hydrant d/kabel FRC 3x1,5 mm dlm PVC HI Conduit 20 mm
2 2 titik 1 605,435 39,000 605,435 39,000
- -

Page 8
- Instalasi Panel Kontrol Genset d/kabel FRC 3x1,5 mm2 dlm PVC HI Conduit 20 mm2 titik 1 605,435 39,000 605,435 39,000
- -
- End Of Line Bh 19 154,375 19,500 2,933,125 370,500

Sub Total Fire Alarm 144,885,265 14,486,000

5. PEKERJAAN LAIN-LAIN :
- Testing dan Commissioning lot 1 13,000,000 - 13,000,000
- Perizinan Instalasi Fire Alarm dari DAMKAR lot 1 9,750,000 - 9,750,000

TOTAL PEKERJAAN LAIN-LAIN - 22,750,000

TOTAL PEKERJAAN FIRE ALARM & LAIN-LAIN 144,885,265 37,236,000

GRAND TOTAL PEKERJAAN FIRE ALARM 182,121,265

Page 9
RENCANA ANGGARAN BIAYA

PROYEK : RS HERMINA
LOKASI : CILEGON
PAKET : PEKERJAAN TELEPON
TANGGAL : OKTOBER 2020

HARGA SATUAN TOTAL HARGA


NO URAIAN JML SAT. MATERIAL UPAH MATERIAL UPAH
Rp. Rp. Rp. Rp.

III INSTALASI TELEPON


A PERALATAN UTAMA (Existing)
"Peralatan Utama Telepon menggunakan Existing"

Sub Total A - -

B ARMATURE & INSTALASI


1 Lantai 1
- Outlet Telephone Direct Merk Boss/Clipsal E8131RJS4 0 bh 154,375 13,000 - -
- Outlet Telephone Extension Merk Boss/Clipsal E8131RJS4 4 bh 154,375 13,000 617,500 52,000
- Handset/Pesawat Telepon Panasonic KX-TS505 4 bh 308,750 19,500 1,235,000 78,000
- Instalasi titik outlet telephone d/kabel 4 ttk 149,150 39,000 596,600 156,000
d/kabel TITC 2x2x0,6 mm2 dlm conduit HI PVC 20 mm2
2 Lantai 2
- Outlet Telephone Direct Merk Boss/Clipsal E8131RJS4 0 bh 154,375 13,000 - -
- Outlet Telephone Extension Merk Boss/Clipsal E8131RJS4 4 bh 154,375 13,000 617,500 52,000
- Handset/Pesawat Telepon Panasonic KX-TS505 4 bh 308,750 19,500 1,235,000 78,000
- - - -
- Instalasi titik outlet telephone d/kabel 4 ttk 149,150 39,000 596,600 156,000
d/kabel TITC 2x2x0,6 mm2 dlm conduit HI PVC 20 mm2
3 Lantai 3
- Outlet Telephone Direct Merk Boss/Clipsal E8131RJS4 0 bh 154,375 13,000 - -
- Outlet Telephone Extension Merk Boss/Clipsal E8131RJS4 3 bh 154,375 13,000 463,125 39,000
- Handset/Pesawat Telepon Panasonic KX-TS505 3 bh 308,750 19,500 926,250 58,500
- -
- Instalasi titik outlet telephone d/kabel 3 ttk 149,150 39,000 447,450 117,000
d/kabel TITC 2x2x0,6 mm2 dlm conduit HI PVC 20 mm2
4 Lantai 4
- Outlet Telephone Direct Merk Boss/Clipsal E8131RJS4 0 bh 154,375 13,000 - -
- Outlet Telephone Extension Merk Boss/Clipsal E8131RJS4 4 bh 154,375 13,000 617,500 52,000
- Handset/Pesawat Telepon Panasonic KX-TS505 4 bh 308,750 19,500 1,235,000 78,000
- - - -
- Instalasi titik outlet telephone d/kabel 4 ttk 149,150 39,000 596,600 156,000
d/kabel TITC 2x2x0,6 mm2 dlm conduit HI PVC 20 mm2

5 Lantai 5
- Outlet Telephone Direct Merk Boss/Clipsal E8131RJS4 0 bh 154,375 13,000 - -
- Outlet Telephone Extension Merk Boss/Clipsal E8131RJS4 11 bh 154,375 13,000 1,698,125 143,000
- Handset/Pesawat Telepon Panasonic KX-TS505 11 bh 308,750 19,500 3,396,250 214,500
- - - -
- Instalasi titik outlet telephone d/kabel 11 ttk 149,150 39,000 1,640,650 429,000
d/kabel TITC 2x2x0,6 mm2 dlm conduit HI PVC 20 mm2

6 Lantai 6
- Outlet Telephone Direct Merk Boss/Clipsal E8131RJS4 0 bh 154,375 13,000 - -
- Outlet Telephone Extension Merk Boss/Clipsal E8131RJS4 2 bh 154,375 13,000 308,750 26,000
- Handset/Pesawat Telepon Panasonic KX-TS505 2 bh 308,750 19,500 617,500 39,000
- - - -
- Instalasi titik outlet telephone d/kabel 2 ttk 149,150 39,000 298,300 78,000
d/kabel TITC 2x2x0,6 mm2 dlm conduit HI PVC 20 mm2

5 Material Bantu 1 lot 3,250,000 3,250,000 -


Sub Total B 20,393,700 2,002,000
C TESTING & COMMISSIONING 1 lot 3,500,000 - 3,500,000
Total C - 3,500,000
TOTAL V ( PEKERJAAN TELEPON ) 20,393,700 5,502,000
GRAND TOTAL 25,895,700

Page 10
RENCANA ANGGARAN BIAYA

PROYEK : RS HERMINA
LOKASI : MALANG
PAKET : PEKERJAAN ELETRIKAL
TANGGAL : OKTOBER 2020

HARGA SATUAN TOTAL HARGA


NO URAIAN JML SAT. MATERIAL UPAH MATERIAL
Rp. Rp. Rp.

IV INSTALASI DATA

A PERALATAN UTAMA (Existing)

1 Pengadaan dan pemasangan peralatan 19" Rack 42U Main Patch Panel utama : Unit -
- Firewall Bh -
- Server Internet Bh -
- Monitor + Keyboard Bh -
- Secure Network Access Controller Bh -
- IP Controller Manager (Optional)
- Anti Virus Server
- Intrution Prevention System (IPS)
- Core Switch c/w Redundant Processor & Power Supply + 3x12 Port 1000 Base
- SX Module & 48 Port 10/100/1000 Base T
- Fiber Optic Panel 8 Port Bh -
- Access Switch 48 Port c/w FO Module Bh -
- Patch Panel Data 48 Port Bh -
- UPS 2 kVA Back Up Battery 4 Jam + Surge Arrester, Rectifier Set -
Grounding System 50 mm2 0,5 Ohm Bh -

2 INSTALASI KABEL

1 Kabel Fiber Optic 6 Core dari Panel Server 48 Port ke Rack 6 U Lt. 1 m' -
2 Kabel Fiber Optic 6 Core dari Panel Server 48 Port ke Rack 6 U Lt. 2 m' -
3 Kabel Fiber Optic 6 Core dari Panel Server 48 Port ke Rack 6 U Lt. 3 m' -
4 Kabel Fiber Optic 6 Core dari Panel Server 48 Port ke Rack 6 U Lt. 4 m' -
5 Kabel Fiber Optic 6 Core dari Panel Server 48 Port ke Rack 6 U Lt. 5 m' -
6 Kabel Fiber Optic 6 Core dari Panel Server 48 Port ke Rack 6 U Lt. 6 m' -

Sub Total A -

B ARMATURE & INSTALASI


1 Lantai 1
- Outlet data Merk Boss/Clipsal 4 bh 137,750 30,000 551,000
- Access Point Wifi 0 bh 1,952,250 141,750 -
- Instalasi Outlet d/kabel UTP Cat 6, 4 Pair dlm PVC HI Conduit 20 mm2 4 ttk 596,876 121,500 2,387,502
- Instalasi Access Point Wifi d/k UTP Cat 6, 4 Pair dlm PVC HI Conduit 20 mm2 0 ttk 596,876 121,500 -
2 Lantai 2
- Outlet data Merk Boss/Clipsal 4 bh 137,750 30,000 551,000
- Access Point Wifi 0 bh 1,952,250 141,750 -
- Instalasi Outlet d/kabel UTP Cat 6, 4 Pair dlm PVC HI Conduit 20 mm2 4 ttk 596,876 121,500 2,387,502
- Instalasi Access Point Wifi d/k UTP Cat 6, 4 Pair dlm PVC HI Conduit 20 mm2 0 ttk 596,876 121,500 -
3 Lantai 3
- Outlet data Merk Boss/Clipsal 3 bh 137,750 30,000 413,250
- Access Point Wifi 0 bh 1,952,250 141,750 -
- Instalasi Outlet d/kabel UTP Cat 6, 4 Pair dlm PVC HI Conduit 20 mm2 3 ttk 596,876 121,500 1,790,627
- Instalasi Access Point Wifi d/k UTP Cat 6, 4 Pair dlm PVC HI Conduit 20 mm2 0 ttk 596,876 121,500 -
4 Lantai 4
- Outlet data Merk Boss/Clipsal 4 bh 137,750 30,000 551,000
- Access Point Wifi 0 bh 1,952,250 141,750 -
- Instalasi Outlet d/kabel UTP Cat 6, 4 Pair dlm PVC HI Conduit 20 mm2 4 ttk 596,876 121,500 2,387,502
- Instalasi Access Point Wifi d/k UTP Cat 6, 4 Pair dlm PVC HI Conduit 20 mm2 0 ttk 596,876 121,500 -
5 Lantai 5
- Outlet data Merk Boss/Clipsal 11 bh 137,750 30,000 1,515,250
- Access Point Wifi 0 bh 1,952,250 141,750 -
- Instalasi Outlet d/kabel UTP Cat 6, 4 Pair dlm PVC HI Conduit 20 mm2 11 ttk 596,876 121,500 6,565,631
- Instalasi Access Point Wifi d/k UTP Cat 6, 4 Pair dlm PVC HI Conduit 20 mm2 0 ttk 596,876 121,500 -
6 Lantai 6
- Outlet data Merk Boss/Clipsal 2 bh 137,750 30,000 275,500
- Access Point Wifi 0 bh 1,952,250 141,750 -
- Instalasi Outlet d/kabel UTP Cat 6, 4 Pair dlm PVC HI Conduit 20 mm2 2 ttk 596,876 121,500 1,193,751
- Instalasi Access Point Wifi d/k UTP Cat 6, 4 Pair dlm PVC HI Conduit 20 mm2 0 ttk 596,876 121,500 -
7 Material Bantu 1 lot 6,170,854 925,628 6,170,854

Sub Total B 26,740,368

C TESTING & COMMISSIONING 1 lot 10,000,000 -

Sub Total B -
TOTAL VI ( PEKERJAAN DATA ) 26,740,368
GRAND TOTAL

Page 11
OTAL HARGA
UPAH
Rp.

-
-
-
-
-

-
-
-
-
-

-
-
-
-
-
-

120,000
-
486,000
-

120,000
-
486,000
-

90,000
-
364,500
-

120,000
-
486,000
-

330,000
-
1,336,500
-

60,000
-
243,000
-
925,628

5,167,628

10,000,000

10,000,000
15,167,628
41,907,996

Page 12
RENCANA ANGGARAN BIAYA

PROYEK : RS HERMINA
LOKASI : MALANG
PAKET : PEKERJAAN ELETRIKAL
TANGGAL : OKTOBER 2020

HARGA SATUAN TOTAL HARGA


NO URAIAN JML SAT. MATERIAL UPAH MATERIAL UPAH
Rp. Rp. Rp. Rp.

V INSTALASI TATA SUARA

A PERALATAN UTAMA (Existing)


"Peralatan utama tata suara menggunakan existing"

B INSTALASI KABEL :

1 "Instalasi kabel feeder tata suara menggunakan existing"

Sub Total A - -

B ARMATURE & INSTALASI


"Instalasi kabel tata suara ke JB-TP Existing untuk masing-masing lantai"

1 Lantai 1
- Horn speaker 15 W 10 bh 568,100 32,500 5,681,000 325,000
- Ceiling speaker 3 W (Unit) 3 bh 239,590 19,500 718,770 58,500
- Ceiling speaker 3 W (Umum) bh 239,590 19,500 - -
- Ceiling speaker 3 W dengan Box (Polipaging) bh 239,590 19,500 - -
- Outlet Microphone 1 bh 191,805 19,500 191,805 19,500
- Wall Speaker 3 W 2 bh 543,400 32,500 1,086,800 65,000

- Instalasi titik Horn speaker 15 W d/kabel NYMHY 2x1,5 mm 2


10 ttk 243,580 39,000 2,435,800 390,000
dlm PVC HI Conduit 20 mm2
- Instalasi titik Ceiling speaker 3 W (Unit) d/kabel NYMHY 2x1,5 mm2 3 ttk 170,430 39,000 511,290 117,000
dlm PVC HI Conduit 20 mm2
- Instalasi titik Ceiling speaker 3 W (Umum) d/kabel NYMHY 2x1,5 mm2 0 ttk 170,430 39,000 - -
dlm PVC HI Conduit 20 mm2
- Instalasi titik Ceiling speaker 3 W (Poli Paging) d/kabel NYMHY 2x1,5 mm2 1 ttk 170,430 39,000 170,430 39,000
dlm PVC HI Conduit 20 mm2
- Instalasi titik Outlet Microphone d/kabel NYMHY 2x1,5 mm2 0 ttk 170,430 39,000 - -
dlm PVC HI Conduit 20 mm2
- Instalasi titik Wall speaker 3 W d/kabel NYMHY 2x1,5 mm2 2 ttk 170,430 39,000 340,860 78,000
dlm PVC HI Conduit 20 mm2

2 Lantai 2
- Horn speaker 15 W 6 bh 568,100 32,500 3,408,600 195,000
- Ceiling speaker 3 W (Unit) bh 239,590 19,500 - -
- Ceiling speaker 3 W (Umum) bh 239,590 19,500 - -
- Wall Speaker 3 W 1 bh 543,400 32,500 543,400 32,500

- Instalasi titik Horn speaker 15 W d/kabel NYMHY 2x1,5 mm2 6 ttk 243,580 39,000 1,461,480 234,000
dlm PVC HI Conduit 20 mm2
- Instalasi titik Ceiling speaker 3 W (Unit) d/kabel NYMHY 2x1,5 mm2 0 ttk 170,430 39,000 - -
dlm PVC HI Conduit 20 mm2
- Instalasi titik Ceiling speaker 3 W (Umum) d/kabel NYMHY 2x1,5 mm2 0 ttk 170,430 39,000 - -
dlm PVC HI Conduit 20 mm2
- Instalasi titik Wall speaker 3 W d/kabel NYMHY 2x1,5 mm2 1 ttk 170,430 39,000 170,430 39,000
dlm PVC HI Conduit 20 mm2

Page 13
3 Lantai 3
- Ceiling speaker 3 W (Unit) 7 bh 239,590 19,500 1,677,130 136,500
- Ceiling speaker 3 W (Umum) 7 bh 239,590 19,500 1,677,130 136,500
- Wall Speaker 3 W 1 bh 543,400 32,500 543,400 32,500

- Instalasi titik Ceiling speaker 3 W (Unit) d/kabel NYMHY 2x1,5 mm 2


7 ttk 170,430 39,000 1,193,010 273,000
dlm PVC HI Conduit 20 mm2
- Instalasi titik Ceiling speaker 3 W (Umum) d/kabel NYMHY 2x1,5 mm2 7 ttk 170,430 39,000 1,193,010 273,000
dlm PVC HI Conduit 20 mm2
- Instalasi titik Wall speaker 3 W d/kabel NYMHY 2x1,5 mm2 1 ttk 170,430 39,000 170,430 39,000
dlm PVC HI Conduit 20 mm2

4 Lantai 4
- Ceiling speaker 3 W (Unit) 5 bh 239,590 19,500 1,197,950 97,500
- Ceiling speaker 3 W (Umum) 8 bh 239,590 19,500 1,916,720 156,000
- Wall Speaker 3 W 1 bh 543,400 32,500 543,400 32,500

- Instalasi titik Ceiling speaker 3 W (Unit) d/kabel NYMHY 2x1,5 mm2 5 ttk 170,430 39,000 852,150 195,000
dlm PVC HI Conduit 20 mm2
- Instalasi titik Ceiling speaker 3 W (Umum) d/kabel NYMHY 2x1,5 mm2 8 ttk 170,430 39,000 1,363,440 312,000
dlm PVC HI Conduit 20 mm2
- Instalasi titik Wall speaker 3 W d/kabel NYMHY 2x1,5 mm2 1 ttk 170,430 39,000 170,430 39,000
dlm PVC HI Conduit 20 mm2

5 Lantai 5
- Ceiling speaker 3 W (Unit) 7 bh 239,590 19,500 1,677,130 136,500
- Ceiling speaker 3 W (Umum) 7 bh 239,590 19,500 1,677,130 136,500
- Wall Speaker 3 W 1 bh 543,400 32,500 543,400 32,500

- Instalasi titik Ceiling speaker 3 W (Unit) d/kabel NYMHY 2x1,5 mm 2


7 ttk 170,430 39,000 1,193,010 273,000
dlm PVC HI Conduit 20 mm2
- Instalasi titik Ceiling speaker 3 W (Umum) d/kabel NYMHY 2x1,5 mm2 7 ttk 170,430 39,000 1,193,010 273,000
dlm PVC HI Conduit 20 mm2
- Instalasi titik Wall speaker 3 W d/kabel NYMHY 2x1,5 mm2 1 ttk 170,430 39,000 170,430 39,000
dlm PVC HI Conduit 20 mm2

6 Lantai 6
- Ceiling speaker 3 W (Unit) 7 bh 239,590 19,500 1,677,130 136,500
- Ceiling speaker 3 W (Umum) 5 bh 239,590 19,500 1,197,950 97,500
- Wall Speaker 3 W 1 bh 543,400 32,500 543,400 32,500

- Instalasi titik Ceiling speaker 3 W (Unit) d/kabel NYMHY 2x1,5 mm2 7 ttk 170,430 39,000 1,193,010 273,000
dlm PVC HI Conduit 20 mm2
- Instalasi titik Ceiling speaker 3 W (Umum) d/kabel NYMHY 2x1,5 mm2 5 ttk 170,430 39,000 852,150 195,000
dlm PVC HI Conduit 20 mm2
- Instalasi titik Wall speaker 3 W d/kabel NYMHY 2x1,5 mm2 1 ttk 170,430 39,000 170,430 39,000
dlm PVC HI Conduit 20 mm2

7 Material Bantu 1 lot 3,500,000 3,500,000 -


Sub Total B 44,807,045 4,979,000

C TESTING & COMMISSIONING 1 lot 3,900,000 - 3,900,000

Sub Total C - 3,900,000


TOTAL VII ( PEKERJAAN TATA SUARA ) 44,807,045 8,879,000

GRAND TOTAL 53,686,045

Page 14
RENCANA ANGGARAN BIAYA

PROYEK : RS HERMINA
LOKASI : MALANG
PAKET : PEKERJAAN ELETRIKAL
TANGGAL : OKTOBER 2020

HARGA SATUAN TOTAL HARGA


NO JML SAT. MATERIAL UPAH MATERIAL
Rp. Rp. Rp.

VI INSTALASI CCTV

A PERALATAN UTAMA (Existing)


"Peralatan utama CCTV menggunakan existing"

B ARMATURE & INSTALASI

1 Lantai 1
- Camera Type Color Dome Indoor Unit 4 bh 2,034,900 536,000 8,139,600

- Instalasi titik Camera Type Color Dome Indoor Unit d/kabel 4 ttk 617,500 130,000 2,470,000
Coaxial RG-11 + NYM 2 x 2,5 mm² dlm conduit HI PVC 20 mm²

2 Lantai 2
- Camera Type Color Dome Indoor Unit 3 bh 2,034,900 536,000 6,104,700
- Instalasi titik Camera Type Color Dome Indoor Unit d/kabel 3 ttk 617,500 130,000 1,852,500
Coaxial RG-11 + NYM 2 x 2,5 mm² dlm conduit HI PVC 20 mm²
3 Lantai 3
- Camera Type Color Dome Indoor Unit 5 bh 2,034,900 536,000 10,174,500
- Instalasi titik Camera Type Color Dome Indoor Unit 5 ttk 617,500 130,000 3,087,500
Coaxial RG-11 + NYM 2 x 2,5 mm² dlm conduit HI PVC 20 mm²

4 Lantai 4
- Camera Type Color Dome Indoor Unit 3 bh 2,034,900 536,000 6,104,700
- Instalasi titik Camera Type Color Dome Indoor Unit 3 ttk 617,500 130,000 1,852,500
Coaxial RG-11 + NYM 2 x 2,5 mm² dlm conduit HI PVC 20 mm²

5 Lantai 5
- Camera Type Color Dome Indoor Unit 7 bh 2,034,900 536,000 14,244,300
- Instalasi titik Camera Type Color Dome Indoor Unit 7 ttk 617,500 130,000 4,322,500
Coaxial RG-11 + NYM 2 x 2,5 mm² dlm conduit HI PVC 20 mm²

6 Lantai 6
- Camera Type Color Dome Indoor Unit 5 bh 2,034,900 536,000 10,174,500
- Instalasi titik Camera Type Color Dome Indoor Unit 5 ttk 617,500 130,000 3,087,500
Coaxial RG-11 + NYM 2 x 2,5 mm² dlm conduit HI PVC 20 mm²

7 Material Bantu (Tiang 8x, hanger & support) 1 lot 7,500,000 7,500,000

79,114,800

C TESTING & COMMISSIONING 1 lot 7,500,000 -

-
TOTAL PEKERJAAN CCTV 79,114,800
GRAND TOTAL

Page 15
TOTAL HARGA
UPAH
Rp.

0.95
2,144,000

520,000

1,608,000
390,000

2,680,000
650,000

1,608,000
390,000

3,752,000
910,000

2,680,000
650,000

17,982,000

7,500,000

7,500,000
25,482,000
104,596,800

Page 16
RENCANA ANGGARAN BIAYA

PROYEK : RS HERMINA
LOKASI : MALANG
PAKET : PEKERJAAN ELETRIKAL
TANGGAL : OKTOBER 2020

HARGA SATUAN TOTAL HARGA


NO URAIAN JML SAT. MATERIAL UPAH MATERIAL
Rp. Rp. Rp.

VII INSTALASI MATV

A PERALATAN UTAMA (Existing)


"Peralatan utama MATV menggunakan existing"

Sub Total A -

B INSTALASI KABEL (Existing)

"Kabel instalasi utama MATV menggunakan existing"

Sub Total B -

C ARMATURE & INSTALASI

1 Lantai 1
- Socket Outlet TV 1 bh 339,625 13,000 339,625
- Instalasi kabel dari Splitter 2 atau 4 Way ke JB-TV Lt.1 1 ttk 261,060 39,000 261,060
d/kabel Coaxial 7C/RG-II dalam Conduit HI PVC Ǿ 20 mm2

2 Lantai 2

3 Lantai 3

Page 17
4 Lantai 4
- JB-Television 1 bh 679,250 32,500 679,250
- Directional Coupler 4 Tap 2 bh 586,625 32,500 1,173,250
- Socket Outlet TV 7 bh 339,625 13,000 2,377,375
- End Of Line 1 bh 154,375 32,500 154,375

- Instalasi kabel dari JB-TV Lt.3 ke JB-TV Lt.4 1 ttk 221,920 39,000 221,920
d/kabel Coaxial 7C/RG-II dalam Conduit HI PVC Ǿ 20 mm2
- Instalasi kabel dari JB-TV Lt.4 ke Directional Coupler 4 Tap 2 ttk 221,920 39,000 443,840
d/kabel Coaxial 7C/RG-II dalam Conduit HI PVC Ǿ 20 mm2
- Instalasi kabel dari Directional Coupler 4 Tap ke Socket Outlet TV 7 ttk 221,920 39,000 1,553,440
d/kabel Coaxial 5C/RG-6 dalam Conduit HI PVC Ǿ 20 mm2

5 Lantai 5
- Socket Outlet TV 1 bh 339,625 13,000 339,625
- Instalasi kabel dari Splitter 2 atau 4 Way ke JB-TV Lt.1 1 ttk 261,060 39,000 261,060
d/kabel Coaxial 7C/RG-II dalam Conduit HI PVC Ǿ 20 mm2

5 Lantai 6

5 Material Bantu 1 lot 2,000,000 2,000,000

Sub Total C 9,804,820

D TESTING & COMMISSIONING 1 lot 3,900,000 -

Sub Total D -
TOTAL XI (PEKERJAAN MATV) 9,804,820
GRAND TOTAL

Page 18
TOTAL HARGA
UPAH
Rp.

13,000
39,000

Page 19
32,500
65,000
91,000
32,500

39,000

78,000

273,000

13,000
39,000

715,000

3,900,000

3,900,000
4,615,000
14,419,820

Page 20
RENCANA ANGGARAN BIAYA

PROYEK : RS HERMINA
LOKASI : CILEGON
PAKET : PEKERJAAN NURSE CALL
TANGGAL : OKTOBER 2020

HARGA SATUAN TOTAL HARGA


NO URAIAN PEKERJAAN SAT. VOL. Material Upah Material
(Rp.) (Rp.) (Rp.)

VIII PEKERJAAN NURSE CALL

3 LANTAI EMPAT

A EQUIPMENT & INSTALASI

- Master Central 20 Call 1 set 19,000,000 1,300,000 19,000,000


- UPS 1 kVA Back Up Battery 4 Jam + Surge Arrester, Rectifier 1 Set 6,175,000 195,000 6,175,000
- Grounding System 50 mm2 0,5 Ohm 1 bh 4,013,750 650,000 4,013,750

- Central Control / Sub Terminal 6 set 926,250 195,000 5,557,500


- Instalasi Pengabelan dari Master Central 20 Call ke Sub Terminal 6 titik 172,235 45,500 1,033,410
d/k. ITC 2x2x0.6mm2 dalam Conduit PVC HI 20mm

- Bed Call 16 bh 1,049,750 65,000 16,796,000


- Instalasi Pengabelan dari Sub Terminal ke Bed Call 16 titik 126,065 39,000 2,017,040
d/k. ITC 2x2x0.6mm dalam Conduit PVC HI 20mm

- Bathroom Pullcord 6 bh 1,543,750 65,000 9,262,500


- Instalasi Pengabelan dari Sub Terminal ke Bed Call 6 titik 149,150 39,000 894,900
d/k. ITC 2x2x0.6mm dalam Conduit PVC HI 20mm

- Call Light Call Reset 6 bh 1,790,750 130,000 10,744,500


- Instalasi Pengabelan dari Sub Terminal ke Bed Call 6 titik 149,150 39,000 894,900
d/k. ITC 2x2x0.6mm dalam Conduit PVC HI 20mm

Sub Total 3 76,389,500

4 LANTAI LIMA

A EQUIPMENT & INSTALASI

- Master Central 20 Call ke existing 0 set 19,000,000 1,300,000 -


- UPS 1 kVA Back Up Battery 4 Jam + Surge Arrester, Rectifier ke existing 0 Set 6,175,000 195,000 -
- Grounding System 50 mm2 0,5 Ohm 1 bh 4,013,750 650,000

- Central Control / Sub Terminal 1 set 926,250 195,000 926,250


- Instalasi Pengabelan dari Master Central 20 Call ke Sub Terminal 1 titik 172,235 45,500 172,235
d/k. ITC 2x2x0.6mm2 dalam Conduit PVC HI 20mm

- Bed Call 1 bh 1,049,750 65,000 1,049,750


- Instalasi Pengabelan dari Sub Terminal ke Bed Call 1 titik 126,065 39,000 126,065
d/k. ITC 2x2x0.6mm dalam Conduit PVC HI 20mm

- Bathroom Pullcord 1 bh 1,543,750 65,000 1,543,750


- Instalasi Pengabelan dari Sub Terminal ke Bed Call 1 titik 149,150 39,000 149,150
d/k. ITC 2x2x0.6mm dalam Conduit PVC HI 20mm

- Call Light Call Reset 1 bh 1,790,750 130,000 1,790,750


- Instalasi Pengabelan dari Sub Terminal ke Bed Call 1 titik 149,150 39,000 149,150
d/k. ITC 2x2x0.6mm dalam Conduit PVC HI 20mm

Sub Total 3 5,907,100

6 TESTING & COMMISSIONING 1 lot 3,900,000 -

Sub Total 4 -
TOTAL PEK. NURCE CALL 82,296,600
GRAND TOTAL

Page 21
TOTAL HARGA
Upah
(Rp.)

1,300,000
195,000
650,000

1,170,000
273,000

1,040,000
624,000

390,000
234,000

780,000
234,000

6,890,000

-
-

195,000
45,500

65,000
39,000

65,000
39,000

130,000
39,000

617,500

3,900,000

3,900,000
11,407,500
93,704,100

Page 22
RENCANA ANGGARAN BIAYA

PROYEK : RS HERMINA
LOKASI : CILEGON
PAKET : PEKERJAAN PLUMBING
TANGGAL : OKTOBER 2020

HARGA SATUAN TOTAL HARGA


NO. URAIAN JML SAT. MATERIAL UPAH MATERIAL UPAH
Rp. Rp. Rp. Rp.

IX PEKERJAAN PLAMBING

1 PERALATAN UTAMA

A POMPA TRANSFER (Dari GWT Air Bersih ke Roof Tank) 1 Set 25,657,125 1,300,000 25,657,125 1,300,000
Kode : TP 01 dan TP 02 Centrifugal End Suction
Type : Centrifugal End Suction
Kapasitas : 2 x 150 LPM
Total Head : 60 M
Putaran : 2900
Efisien (%) : 70
Daya Listrik : 1 kW
Electricity (V/Ph/Hz) : 380/3/50
Operasi : 1 Duty, 1 Standby dgn Panel Kontrol
Jumlah : 2
Lengkap dengan kabel kontrol, panel kontrol + kabel power
dari panel kontrol ke unit pompa, steel base frame inertial
block + vibration mounting, support dan accessories pompa sesuai gambar

Accessories Pompa Transfer


- Gate Valve : dia. 50 mm (2") 4 bh 931,936 45,500 3,727,743 182,000
: dia. 65 mm (2,5") 2 bh 3,521,427 56,900 7,042,854 113,800
- Check Valve : dia. 50 mm (2") 2 bh 1,216,660 45,500 2,433,321 91,000
- Y Strainer : dia. 65 mm (2,5") 2 bh 3,433,571 56,900 6,867,142 113,800
- Flaxible Joint : dia. 50 mm (2") 2 bh 590,283 45,500 1,180,565 91,000
: dia. 65 mm (2,5") 2 bh 772,858 56,900 1,545,717 113,800
- Header : dia. 100 mm (4") 2 m' 410,372 390,000 820,743 780,000
- Pressure Gauge 2 bh 446,144 32,500 892,288 65,000
- Pressure Switch 2 bh 1,312,188 32,500 2,624,375 65,000
- Level Switch 1 bh 1,574,625 325,000 1,574,625 325,000

B POMPA BOOSTER 1 Set 43,605,000 650,000 43,605,000 650,000


Kode : PB (Paket Booster Pump)
Type : Centrifugal End Suction
Kapasitas : 150 LPM
Total Head : 30 M
Putaran : 2900
Efisien (%) : 75
Daya Listrik : 2,2 kW
Electricity (V/Ph/Hz) : 380/3/50
Operasi : Paralel Alternatif dgn Kontrol Motor Variable Speed Drive
Jumlah : 2
Lengkap dengan kabel kontrol, panel kontrol + kabel power
dari panel kontrol ke unit pompa, steel base frame inertial
block + vibration mounting, support dan accessories pompa sesuai gambar

C ROOF TANK AIR BERSIH 1 set 55,575,000 3,250,000 55,575,000 3,250,000


Material : Panel
Kapasitas : 12 m³
Lengkap dengan base frame, sight glass, manhole, vent, drain
dan asesories lainnya sesuai gambar dan spesifikasi teknis

D Material bantu 2 lot 1,852,500 975,000 3,705,000 1,950,000

7 EQUIPMENT OZONISASI

1 Water Sterillisai kap. 1m3/Jam 1 pkt 181,545,000 18,154,500 181,545,000 18,154,500

A. 1 Raw water 1 unit


a.kap.2000 liter
b.bahan Polyethylene/PE

B. Pompa Filter 2 buah


a. Kap. 40 Liter/menit
b. Total Head 25 m
c. Body & Impeller stentess stell
d. Power 250 w/ 220 Vac/ 50 hz/ 1 phase

C. Sand Filter 1 unit


Tipe : Presure Filter
Kapasitas : ± 1 m3/Hour
Material Tangki : 40 M
Daya Listrik : 600 watt
Operasi : Level Kontrol

D. Activated Carbon Filter (1 Unit )


Tipe : Pressure Filter
Page 23 of 113
Kapasitas : ± 14m3/Hour
Material Tangki : FRP - polyglass - Pent air / Luso.
Dimensi : Ø 500 x 1200
Media : Gravel silica & Activated Carbon-Calgon
Operating Pressure : 4 kg/cm2
Backwash Methods : Manual w/ multiport valve
Accessories : - Top & bottom filter nozzle/strainer
- handle pipe PVC - AW
- Manual multiport valve

E. Manganesse zeolite Filter (1 Unit)


Tipe : Pressure Filter
Kapasitas : ± 14m3/Hour
Material Tangki : FRP - polyglass - Pent air / Luso.
Dimensi : Ø 500 x 1200
Media : Zeolite
Operating Pressure : 4 kg/cm2
Backwash Methods : Manual w/ multiport valve
Accessories : - Top & bottom filter nozzle/strainer
- handle pipe PVC - AW
- Manual multiport valve

F. Micro filter 1 (1 Unit)


Housing
Model : Clear or Blue housing
Dimensi : 20'' length
Inlet / outlet : 3/4 '' connection
Cartridge
Material : spoon polypropylene
Dimensi / mesh : 20'' length ,--- 5 µ

G. Ozon Circulation Tank ( Product Tank ) (1 Unit)


Product :
Volume : 1.500 liter
Material : Stainless steel
Dimensi : ± Ф 1250 x H. 1200
Assesoris : Inlet/Outlet Nozzle, Drain Nozzle

H. Ozon Circulation pump (1 Unit)


Merk : DAB or equal
Kapasitas : +/- 30 LPM ( ± 1,8 m3/jam )
T. Head : ± 25 m
Body & Impeller : Stainless steel
Power : ± 0.25 Kw/ 220 VAC/ 50 Hz/ 1 ph

I. Ozonisation (1 Unit)
Merk : Elitech- BNP Ozon Tecnology
Model : OZ - 10 G
Kapasitas : 10 gr/jam O3
Acessories : - ozon tubing
Power : ± 200 W, 220 VAC, 50 Hz

J. Ventury injector (1 Unit)


Merk : Mazzei or equal
Model : injector - PVDF
Size : 3/4 '' connection

K. UV pump (2 Unit)
Merk : DAB or equal
Kapasitas : +/- 30 LPM ( ± 1,8 m3/jam )
T. Head : ± 25 m
Body & Impeller : Stainless steel
Power : ± 0.25 Kw/ 220 VAC/ 50 Hz/ 1 ph

L. Micro filter 2 (1 Unit)


Housing
Model : Clear or Blue housing
Dimensi : 20'' length
Inlet / outlet : 3/4 '' connection
Cartridge
Material : Carbon Block
Dimensi / mesh : 20'' length ,--- 3 µ

M. Micro filter 3 (1 Unit)


Housing
Model : Clear or Blue housing
Dimensi : 20'' length
Inlet / outlet : 3/4 '' connection
Cartridge
Material : spoon polypropylene
Dimensi / mesh : 20'' length ,--- 1 µ

N. Ultra Violet (1 Unit)


Merk : Sterilight or equal
Model : S 8Q PA
Flow frate : ± 8 GPM ( 1,8 M3/jam )
Power : ± 30 W, 220 V, 50 Hz
Port size : 3/4 " MNPT

Page 24 of 113
Chamber : Stainless steel 304

O. Distribution pump (2 Unit)


Merk : DAB or equal
Kapasitas : +/- 30 LPM ( ± 1,8 m3/jam )
T. Head : ± 25 m
Body & Impeller : Stainless steel
Power : ± 0.25 Kw/ 220 VAC/ 50 Hz/ 1 ph

P. Interconnection Pipe (1 Unit)


Material : PVC - AW
Accessories : Valve, Fitting & support

Q. Panel Control & Electrical (1 Unit)


Type : Indoor
Including : - Panel Box & acessoris
- Contactor & Relay, Control wiring
- Switches, Push botton & Pilot lamp
- Mechanical Cable, WLC, conduit dll

Sub Total 3 338,796,496 27,244,900

A INSTALASI PEMIPAAN AIR BERSIH

Page 25 of 113
1 INSTALASI PEMIPAAN AIR BERSIH
LANTAI 1

a Instalasi pipa ke dalam toilet & wastafel


Pipa POLY PROPELENE PN-10, termasuk,fitting,klem,hanger,support,elbow,tee,
dan reducer.
Ø 15 mm (1/2") : Ø 15 mm (1/2") 12 m 10,965 13,000 131,580 156,000
: Ø 25 mm (1") 35 m 27,540 13,000 963,900 455,000

Gate valve :
: Ø 25 mm (1") 12 bh 27,540 13,000 330,480 156,000
: Ø 15 mm (1/2") 24 bh 10,965 13,000 263,160 312,000

b Fitting 1 lot 524,620 231,500 524,620 231,500

c Material bantu 1 lot 393,465 308,600 393,465 308,600

Sub Total 3 2,607,205 1,619,100

2 INSTALASI PEMIPAAN AIR BERSIH


LANTAI 2

c Instalasi pipa ke dalam toilet & wastafel


Pipa POLY PROPELENE PN-10, termasuk,fitting,klem,hanger,support,elbow,tee,
dan reducer.
Pipa Ø 15 mm (1/2") 0 m 10,965 13,000 - -
: Ø 25 mm (1") 0 m 27,540 13,000 - -

Gate valve : Ø 50 mm (2") 0 bh 107,100 26,000 - -


: Ø 25 mm (1") 0 bh 27,540 13,000 - -
: Ø 15 mm (1/2") 0 bh 10,965 13,000 - -

d Fitting 0 lot 524,620 231,500 - -

e Material bantu 0 lot 393,465 308,600 - -

Sub Total 4 - -

3 INSTALASI PEMIPAAN AIR BERSIH


LANTAI 3

a Instalasi pipa dalam shaft


Pipa POLY PROPELENE PN-10, termasuk,fitting,klem,hanger,support,elbow,tee,
dan reducer.
Pipa : Ø 25 mm (1") 15 m 27,540 13,000 413,100 195,000

b Instalasi pipa ke dalam toilet & wastafel


Pipa POLY PROPELENE PN-10, termasuk,fitting,klem,hanger,support,elbow,tee,
dan reducer.
Pipa : Ø 15 mm (1/2") 25 m 10,965 13,000 274,125 325,000

c Gate valve
: Ø 25 mm (1") 3 bh 380,630 22,800 1,141,890 68,400
f Pipa Ozonisasi PPR PN-20
Pipa POLY PROPELENE PN-20, termasuk,fitting,klem,hanger,support,elbow,tee,
dan reducer.
Pipa : Ø 25 mm (1") Supply 15 m 38,165 13,000 572,475 195,000
: Ø 20 mm (3/4") Return 10 m 23,205 13,000 232,050 130,000

Gate valve : Ø 25 mm (1") 3 bh 380,630 22,800 1,141,890 68,400

g Fitting 1 lot 965,175 425,900 965,175 425,900

h Material bantu 1 lot 723,945 567,800 723,945 567,800

Sub Total 5 5,464,650 1,975,500

4 INSTALASI PEMIPAAN AIR BERSIH


LANTAI 4

a Instalasi pipa ke dalam toilet & wastafel


Pipa POLY PROPELENE PN-10, termasuk,fitting,klem,hanger,support,elbow,tee,
dan reducer.
Pipa : Ø 15 mm (1/2") 17.5 m 10,965 13,000 191,888 227,500
: Ø 25 mm (1") 45 m 27,540 13,000 1,239,300 585,000

b Gate valve : Ø 25 mm (1") 6 bh 380,630 22,800 2,283,780 136,800


: Ø 15 mm (1/2") 4 bh 222,020 22,800 888,080 91,200

c Pipa Ozonisasi PPR PN-20


Pipa POLY PROPELENE PN-20, termasuk,fitting,klem,hanger,support,elbow,tee,
dan reducer.
Pipa : Ø 25 mm (1") Supply 17.5 m 38,165 13,000 667,888 227,500
: Ø 20 mm (3/4") Return 45 m 23,205 13,000 1,044,225 585,000

Gate valve : Ø 25 mm (1") 6 bh 380,630 22,800 2,283,780 136,800

e Fitting 1 lot 965,175 425,900 965,175 425,900

Page 26 of 113
f Material bantu 1 lot 723,945 567,800 723,945 567,800

Sub Total 6 10,288,060 2,983,500

5 INSTALASI PEMIPAAN AIR BERSIH


LANTAI 5

a Instalasi pipa ke dalam toilet & wastafel


Pipa POLY PROPELENE PN-10, termasuk,fitting,klem,hanger,support,elbow,tee,
dan reducer.
Pipa : Ø 15 mm (1/2") 17.5 m 10,965 13,000 191,888 227,500
: Ø 25 mm (1") 30 m 27,540 13,000 826,200 390,000

b Gate valve : Ø 25 mm (1") 4 bh 380,630 22,800 1,522,520 91,200

c Pipa Ozonisasi PPR PN-20


Pipa POLY PROPELENE PN-20, termasuk,fitting,klem,hanger,support,elbow,tee,
dan reducer.
Pipa : Ø 25 mm (1") Supply 17.5 m 38,165 13,000 667,888 227,500
: Ø 20 mm (3/4") Return 30 m 23,205 13,000 696,150 390,000

Gate valve : Ø 25 mm (1") 4 bh 380,630 22,800 1,522,520 91,200

d Fitting 1 lot 965,175 425,900 965,175 425,900

e Material bantu 1 lot 723,945 567,800 723,945 567,800

Sub Total 6 7,116,285 2,411,100

10 INSTALASI PEMIPAAN AIR BERSIH


LANTAI 6
a Instalasi pipa ke dalam toilet & wastafel
Pipa POLY PROPELENE PN-10, termasuk,fitting,klem,hanger,support,elbow,tee,
dan reducer.
Pipa : Ø 15 mm (1/2") 48 m 10,965 13,000 526,320 624,000

b Gate valve : Ø 25 mm (1") 4 bh 380,630 22,800 1,522,520 91,200

c Pipa Ozonisasi PPR PN-20


Pipa POLY PROPELENE PN-20, termasuk,fitting,klem,hanger,support,elbow,tee,
dan reducer.
Pipa : Ø 25 mm (1") Supply 102 m 38,165 13,000 3,892,830 1,326,000
: Ø 20 mm (3/4") Return 102 m 23,205 13,000 2,366,910 1,326,000

Gate valve : Ø 25 mm (1") 10 bh 380,630 22,800 3,806,300 228,000

Check valve : Ø 20 mm (3/4") 10 bh 301,155 22,800 3,011,550 228,000

d Fitting 1 lot 965,175 425,900 965,175 425,900

e Material bantu 1 lot 723,945 567,800 723,945 567,800

Sub Total 6 16,815,550 4,816,900

SUB TOTAL AIR BERSIH 381,088,246 41,051,000

E INSTALASI PEMIPAAN AIR KOTOR, AIR BEKAS


DAN VENT

1 PERALATAN UTAMA
a Bak Ipal -
Kapasitas : Existing

Sub Total 1 - -

INSTALASI PEMIPAAN AIR KOTOR, BEKAS


2 LANTAI 1

a Instalasi Pipa Air Kotor tipe PVC AW Class 10 kg/cm2 (Riser)


Pipa : Ø 150 mm (6") 15 m 234,000 35,100 3,510,000 526,500

b Instalasi Pipa Air Bekas Kotor tipe PVC AW Class 10 kg/cm2


Pipa : Ø 150 mm (6") 15 m 234,000 35,100 3,510,000 526,500

c Instalasi Pipa Venting tipe PVC D Class 8 kg/cm2 (Riser)


Pipa : Ø 100 mm (4") 8 m 52,188 7,828 417,500 62,625

d Floor Clean Out : Ø 150 mm (6") 2 bh 607,750 65,000 1,215,500 130,000

e Fitting 1 lot 2,595,900 519,180 2,595,900 519,180

Page 27 of 113
o Material bantu 1 lot 1,817,130 363,426 1,817,130 363,426

Sub Total 2 13,066,030 2,128,231

INSTALASI PEMIPAAN AIR KOTOR, BEKAS


3 LANTAI 2

a Instalasi Pipa Air Bekas Kotor tipe PVC AW Class 10 kg/cm2


Pipa : Ø 150 mm (6") 0 m 234,000 35,100 - -
Ø 100 mm (4") 0 m 101,563 15,234 - -
Ø 65 mm (2 1/2") 0 m 43,438 6,516 - -
: Ø 50 mm (2") 0 m 30,000 4,500 - -

j Instalasi Pipa Venting tipe PVC D Class 8 kg/cm2


Pipa : Ø 50 mm (2") 0 m 18,750 2,813 - -
: Ø 32 mm (1 1/4") 0 m 12,813 1,922 - -

k Ceiling Clean Out (CCO) : Ø 100 mm (4") 0 bh 469,625 32,500 - -


Ø 150 mm (6") 0 bh 607,750 65,000 - -
Floor Drain + U-trap : Ø 50 mm (2") 0 bh 718,250 65,000 - -

l Fitting 0 lot - - -

m Material bantu 0 lot - -

Sub Total 3 - -

INSTALASI PEMIPAAN AIR KOTOR, BEKAS


4 LANTAI 3

a Instalasi Pipa Air Bekas Kotor tipe PVC AW Class 10 kg/cm2


Pipa : Ø 150 mm (6") 0 m 234,000 35,100 - -
Ø 100 mm (4") 0 m 101,563 15,234 - -
: Ø 50 mm (2") 40 m 30,000 4,500 1,200,000 180,000

b Instalasi Pipa Venting tipe PVC D Class 8 kg/cm2


Pipa : Ø 50 mm (2") 25 m 18,750 2,813 468,750 70,313
: Ø 32 mm (1 1/4") 15 m 12,813 1,922 192,188 28,828

c Ceiling Clean Out (CCO) : Ø 100 mm (4") 4 bh 469,625 32,500 1,878,500 130,000
Ø 150 mm (6") 0 bh 607,750 65,000 - -
Floor Drain + U-trap : Ø 50 mm (2") 12 bh 718,250 65,000 8,619,000 780,000

d Fitting 1 lot 3,707,531 556,130 3,707,531 556,130

e Material bantu 1 lot 2,966,025 444,904 2,966,025 444,904

Sub Total 4 19,031,994 2,190,174

INSTALASI PEMIPAAN AIR KOTOR, BEKAS


5 LANTAI 4

a Instalasi Pipa Air Bekas Kotor tipe PVC AW Class 10 kg/cm2


Pipa : Ø 150 mm (6") 0 m 234,000 35,100 - -
Ø 100 mm (4") 96 m 101,563 15,234 9,750,000 1,462,500
: Ø 50 mm (2") 140 m 30,000 4,500 4,200,000 630,000

b Instalasi Pipa Venting tipe PVC D Class 8 kg/cm2


Pipa : Ø 50 mm (2") 138 m 18,750 2,813 2,587,500 388,125
: Ø 32 mm (1 1/4") 194 m 12,813 1,922 2,485,625 372,844

c Ceiling Clean Out (CCO) : Ø 100 mm (4") 12 bh 469,625 32,500 5,635,500 390,000
Ø 150 mm (6") 0 bh 607,750 65,000 - -
Floor Drain + U-trap : Ø 50 mm (2") 12 bh 718,250 65,000 8,619,000 780,000

d Fitting 1 lot 9,983,288 1,497,493 9,983,288 1,497,493

e Material bantu 1 lot 6,988,301 1,048,245 6,988,301 1,048,245

Sub Total 5 50,249,214 6,569,207

INSTALASI PEMIPAAN AIR KOTOR, BEKAS


5 LANTAI 5

a Instalasi Pipa Air Bekas Kotor tipe PVC AW Class 10 kg/cm2


Pipa : Ø 150 mm (6") 16 m 234,000 35,100 3,744,000 561,600
Ø 100 mm (4") 16 m 101,563 15,234 1,625,000 243,750
: Ø 50 mm (2") 20 m 30,000 4,500 600,000 90,000
- -
b Instalasi Pipa Venting tipe PVC D Class 8 kg/cm2 - -
Pipa : Ø 50 mm (2") 32 m 18,750 2,813 600,000 90,000
: Ø 32 mm (1 1/4") 20 m 12,813 1,922 256,250 38,438
- -
c Ceiling Clean Out (CCO) : Ø 100 mm (4") 3 bh 469,625 32,500 1,408,875 97,500
Ø 150 mm (6") 0 bh 607,750 65,000 - -
Floor Drain + U-trap : Ø 50 mm (2") 2 bh 718,250 65,000 1,436,500 130,000
-
d Fitting 1 lot 2,901,188 435,178 2,901,188 435,178
-
e Material bantu 1 lot 2,030,831 304,625 2,030,831 304,625

Sub Total 5 14,602,644 1,991,090

Page 28 of 113
INSTALASI PEMIPAAN AIR KOTOR, BEKAS
5 LANTAI 6

a Instalasi Pipa Air Bekas Kotor tipe PVC AW Class 10 kg/cm2


Pipa : Ø 150 mm (6") 16 m 234,000 35,100 3,744,000 561,600
Ø 100 mm (4") 16 m 101,563 15,234 1,625,000 243,750
: Ø 50 mm (2") 20 m 30,000 4,500 600,000 90,000
- -
b Instalasi Pipa Venting tipe PVC D Class 8 kg/cm2 - -
Pipa : Ø 50 mm (2") 32 m 18,750 2,813 600,000 90,000
: Ø 32 mm (1 1/4") 20 m 12,813 1,922 256,250 38,438
- -
c Ceiling Clean Out (CCO) : Ø 100 mm (4") 3 bh 469,625 32,500 1,408,875 97,500
Ø 150 mm (6") 0 bh 607,750 65,000 - -
Floor Drain + U-trap : Ø 50 mm (2") 2 bh 718,250 65,000 1,436,500 130,000

d Fitting 1 lot 2,901,188 435,178 2,901,188 435,178


-
e Material bantu 1 lot 2,030,831 304,625 2,030,831 304,625

Sub Total 5 14,602,644 1,991,090

AIR KOTOR & BEKAS 111,552,525 14,869,793

F PEKERJAAN INSTALASI PEMIPAAN AIR HUJAN

1 LANTAI SATU

RERALATAN UTAMA

Bak Kontrol : 900 x 900 mm 5 1,250,000 1,250,000

Sumur Resapan : 4500 3500 mm 1 3,200,000 3,200,000

a Instalasi Pipa Riser Air Hujan tipe PVC AW Class 10 kg/cm2


Pipa : Ø 100 mm (4") 32 m 101,563 15,234 3,250,000 487,500

Page 29 of 113
b Instalasi Pipa Air Hujan dari Riser ke Bak Kontrol tipe PVC AW Class 10 kg/cm2
Pipa : Ø 100 mm (4") 50 m 101,563 15,234 5,078,125 761,719

c Instalasi Pipa Air Hujan dari Bak Kontrol ke Sumur Resapan tipe PVC AW Class 10 kg/cm2
Pipa : Ø 100 mm (4") 40 m 101,563 15,234 4,062,500 609,375

d Instalasi Pipa Air Hujan dari Sumur Resapan ke Saluran tipe PVC AW Class 10 kg/cm2
Pipa : Ø100 mm (4") 12 m 101,563 15,234 1,218,750 182,813

e Fitting 1 lot 4,082,813 612,422 4,082,813 612,422

f Material bantu 1 lot 3,266,250 489,938 3,266,250 489,938

Sub Total 1 20,958,438 3,143,766

INSTALASI PEMIPAAN AIR HUJAN


2 LANTAI DUA

a Instalasi Pipa Riser Air Hujan tipe PVC AW Class 10 kg/cm2


Pipa : Ø 100 mm (4") 32 m 101,563 15,234 3,250,000 487,500

b Fitting 1 lot 975,000 146,250 975,000 146,250

c Material bantu 1 lot 780,000 117,000 780,000 117,000

Sub Total 2 5,005,000 7,038,281

INSTALASI PEMIPAAN AIR HUJAN


3 LANTAI TIGA

a Instalasi Pipa Riser Air Hujan tipe PVC AW Class 10 kg/cm2


Pipa : Ø 100 mm (4") 32 m 101,563 15,234 3,250,000 487,500

b Fitting 1 lot 975,000 146,250 975,000 146,250

c Material bantu 1 lot 780,000 117,000 780,000 117,000

Sub Total 3 5,005,000 750,750

INSTALASI PEMIPAAN AIR HUJAN


4 LANTAI EMPAT

a Instalasi Pipa Riser Air Hujan tipe PVC AW Class 10 kg/cm2


Pipa : Ø 100 mm (4") 32 m 101,563 15,234 3,250,000 487,500

b Fitting 1 lot 975,000 146,250 975,000 146,250

c Material bantu 1 lot 780,000 117,000 780,000 117,000

Sub Total 4 5,005,000 750,750

INSTALASI PEMIPAAN AIR HUJAN


4 LANTAI LIMA

a Instalasi Pipa Riser Air Hujan tipe PVC AW Class 10 kg/cm2


Pipa : Ø 100 mm (4") 32 m 101,563 15,234 3,250,000 487,500

b Fitting 1 lot 975,000 146,250 975,000 146,250

c Material bantu 1 lot 780,000 117,000 780,000 117,000

Sub Total 4 5,005,000 750,750

INSTALASI PEMIPAAN AIR HUJAN


4 LANTAI ENAM

a Instalasi Pipa Riser Air Hujan tipe PVC AW Class 10 kg/cm2


Pipa : Ø 100 mm (4") 32 m 101,563 15,234 3,250,000 487,500

b Fitting 1 lot 975,000 146,250 975,000 146,250

c Material bantu 1 lot 780,000 117,000 780,000 117,000

Sub Total 4 5,005,000 750,750

INSTALASI PEMIPAAN AIR HUJAN


5 LANTAI ATAP

a Instalasi Pipa Riser Air Hujan tipe PVC AW Class 10 kg/cm2


Pipa : Ø 100 mm (4") 32 m 101,563 15,234 3,250,000 487,500

b Roof Drain : Ø 100 mm (4") 10 bh 250,000 75,000 2,500,000 750,000

Page 30 of 113
c Fitting 1 lot 1,725,000 258,750 1,725,000 258,750

d Material bantu 1 lot 1,380,000 207,000 1,380,000 207,000

Sub Total 5 8,855,000 1,008,750


TOTAL AIR HUJAN 54,838,438 12,692,297

TOTAL PEKERJAAN PLUMBING 547,479,208 68,613,090

GRAND TOTAL PLUMBING 616,092,298

Page 31 of 113
RENCANA ANGGARAN BIAYA

PROYEK : RS HERMINA
LOKASI : CILEGON
PAKET : PEKERJAAN PLUMBING
TANGGAL : OKTOBER 2020

HARGA SATUAN TOTAL HARGA


NO. URAIAN JML SAT. MATERIAL UPAH MATERIAL
Rp. Rp. Rp.

X PEKERJAAN SISTEM GAS MEDIS

I LANTAI SATU
PERALATAN UTAMA (Existing) By Owner

A EQUIPMENT
a Tabung Oksigen btl -
b Tabung Nitrogen btl -

c Header Ø 1,5" d/pipa Oksigen m -


ASTM B-819 Type L. Unipro
d Header Ø 1,5" d/pipa Nitrogen m -
ASTM B-819 Type L. Unipro

e Digital Automatic Change Over Gas Mainfold + Digital Pressure Gauge Set -

f Pigtail bh -
g Gate Valve type K Lead Copper Tube bh -
h Ball Valve 1/2" bh -

B INSTALASI
1 Instalasi Pemipaan O2
- Cooper Tube pipa : Ø 1" m -
ASTM B-819 Type L. Unipro : (3/8") m -
: (1/2") m -
: (3/4") m -
Pipa Riser : Ø 1" m -
- Fitting Dan Accessories lot -

2 Instalasi Pemipaan NO2


- Cooper Tube pipa : (3/8") m -
ASTM B-819 Type L. Unipro
Pipa Riser : (3/8") m -
- Fitting Dan Accessories lot -

3 Zone Valve & Alarm System


a Area Alarm (O2) bh -
b Zone Valve (O2) bh -

c Outlet Oxygen (O2) bh -

d Ball Vave : (3/4") bh -

e - Fitting Dan Accessories lot -

Sub Total 1 -

II LANTAI DUA

a Area Alarm (O2) bh -

b Zone Valve (O2) bh -

c Area Alarm (N2O) bh -

d Zone Valve (N2O) bh -

e Outlet for Oxygen (O2) bh -

f Outlet for Nitrogen (N2O) bh -

g Ball Vave : (1/2") bh -


: (3/4") bh -

h Instalasi Pipa (O2)


Pekerjaan Pipa Menggunakan Pipa Tembaga Seamless ASTM B-819 Type L,
Support Pipa Dibuat Maksimal Setiap @ Meter Pipa Pada Support Dilindungi
Oleh Bahan Karet/Plastik
- Diameter : Ø 1" m -
: (3/8") m -
: (1/2") m -
: (3/4") m -

Page 32 of 113
i Instalasi Pipa (N2O)
Pekerjaan Pipa Menggunakan Pipa Tembaga Seamless ASTM B-819 Type L,
Support Pipa Dibuat Maksimal Setiap @ Meter Pipa Pada Support Dilindungi
Oleh Bahan Karet/Plastik
- Diameter : (3/8") m -
: (3/4") m -

j Pipa Riser : (3/4") m -


: (1") m -

k - Fitting Dan Accessories lot -

Sub Total 2 -

III LANTAI TIGA


a Area Alarm (O2) 1 bh 6,823,375 650,000 6,823,375

b Zone Valve (O2) 1 bh 5,773,625 650,000 5,773,625

c Outlet for Oxygen (O2) 16 bh 1,942,038 325,000 31,072,600

f Outlet for Nitrogen (N2O) 2 bh 2,284,750 325,000 4,569,500

d Ball Vave : (1/2") 21 bh 356,150 72,800 7,479,150

e Instalasi Pipa (O2)


Pekerjaan Pipa Menggunakan Pipa Tembaga Seamless ASTM B-819 Type L,
Support Pipa Dibuat Maksimal Setiap @ Meter Pipa Pada Support Dilindungi
Oleh Bahan Karet/Plastik
- Diameter : (3/8") 341 m 82,930 19,500 28,279,215
: (1/2") 119 m 91,974 19,500 10,944,936
: (3/4") 86 m 162,065 19,500 13,937,612

Pipa Riser : (1") 4 m 170,595 19,500 682,380

f - Fitting Dan Accessories 1 lot 10,956,239 1,643,436 10,956,239

i Instalasi Pipa (N2O)


Pekerjaan Pipa Menggunakan Pipa Tembaga Seamless ASTM B-819 Type L,
Support Pipa Dibuat Maksimal Setiap @ Meter Pipa Pada Support Dilindungi
Oleh Bahan Karet/Plastik
- Diameter : (3/8") 44 m 82,930 19,500 3,648,931
: (3/4") 0 m 162,065 19,500 -

j Pipa Riser : (3/8") 4 m 82,930 19,500 331,721


: (1") 0 m 170,595 19,500 -

k - Fitting Dan Accessories 1 lot 1,194,196 179,129 1,194,196

Sub Total 3 120,518,632

IV LANTAI EMPAT
a Area Alarm (O2) 1 bh 6,823,375 650,000 6,823,375

b Zone Valve (O2) 1 bh 5,773,625 650,000 5,773,625

c Outlet for Oxygen (O2) 16 bh 1,942,038 325,000 31,072,600

d Ball Vave : (1/2") 6 bh 356,150 72,800 2,136,900

e Instalasi Pipa (O2)


Pekerjaan Pipa Menggunakan Pipa Tembaga Seamless ASTM B-819 Type L,
Support Pipa Dibuat Maksimal Setiap @ Meter Pipa Pada Support Dilindungi
Oleh Bahan Karet/Plastik
- Diameter : Ø 1" 25 m 170,595 19,500 4,264,875
: (3/8") 240 m 82,930 19,500 19,903,260
: (1/2") 20 m 91,974 19,500 1,839,485

f - Fitting Dan Accessories 1 lot 7,181,412 1,077,212 7,181,412

Sub Total 4 78,995,532


V LANTAI LIMA
a Area Alarm (O2) bh 6,823,375 650,000 -

b Zone Valve (O2) bh 5,773,625 650,000 -

c Outlet for Oxygen (O2) bh 1,942,038 325,000 -

d Ball Vave : (1/2") bh 356,150 72,800 -

e Instalasi Pipa (O2)


Pekerjaan Pipa Menggunakan Pipa Tembaga Seamless ASTM B-819 Type L,
Support Pipa Dibuat Maksimal Setiap @ Meter Pipa Pada Support Dilindungi
Oleh Bahan Karet/Plastik
- Diameter : (3/8") m 82,930 19,500 -
: (1/2") m 91,974 19,500 -
: (3/4") m 162,065 19,500 -

f - Fitting Dan Accessories lot -


Page 33 of 113
Sub Total 5 -
VI LANTAI ENAM
a Area Alarm (O2) 1 bh 6,823,375 650,000 6,823,375

b Zone Valve (O2) 1 bh 5,773,625 650,000 5,773,625

c Outlet for Oxygen (O2) 11 bh 1,942,038 325,000 21,362,413

d Ball Vave : (1/2") 2 bh 356,150 72,800 712,300

e Instalasi Pipa (O2)


Pekerjaan Pipa Menggunakan Pipa Tembaga Seamless ASTM B-819 Type L,
Support Pipa Dibuat Maksimal Setiap @ Meter Pipa Pada Support Dilindungi
Oleh Bahan Karet/Plastik
- Diameter : Ø 1" 25 m 170,595 19,500 4,264,875
: (3/8") 240 m 82,930 19,500 19,903,260
: (1/2") 20 m 91,974 19,500 1,839,485

f - Fitting Dan Accessories 1 lot 6,067,933 910,190 6,067,933

Sub Total 6 66,747,266

VII Pekerjaan Lain-Lain


- Testing & Comissioning 1 lot 15,000,000 -

Sub Total 7 -

TOTAL PEKERJAAN GAS MEDIS 199,514,164


TOTAL PEKERJAAN GAS MEDIS 199,514,164

GRAND TOTAL GAS MEDIS 2

Page 34 of 113
TOTAL HARGA
UPAH
Rp.

-
-

-
-
-

-
-
-
-
-
-

-
-

-
-

-
-

-
-
-
-

Page 35 of 113
-
-

-
-

650,000

650,000

5,200,000

650,000

1,528,800

6,649,500
2,320,500
1,677,000

78,000

1,643,436

858,000
-

78,000
-

179,129

21,047,236

650,000

650,000

5,200,000

436,800

487,500
4,680,000
390,000

1,077,212

13,571,512

-
-
-

-
Page 36 of 113
-

650,000

650,000

3,575,000

145,600

487,500
4,680,000
390,000

910,190

11,488,290

15,000,000

15,000,000

49,618,748
49,618,748

249,132,911

Page 37 of 113
RENCANA ANGGARAN BIAYA

PROYEK : RS HERMINA
LOKASI : CILEGON
PAKET : PEKERJAAN VAC
TANGGAL : OKTOBER 2020

HARGA SATUAN TOTAL HARGA


NO URAIAN PEKERJAAN SAT. VOL. Material Upah Material
(Rp.) (Rp.) (Rp.)
XI PEKERJAAN AIR CONDITIONING

I PERALATAN UTAMA AIR CONDITIONING, INSTALASI KABEL POWER & KONTROL,


DAN PEMIPAAN REFRIGERANT

A LANTAI 1 (SATU)
Pengadaan Dan Pemasangan Air Cooled Lengkap Dengan Accessories
ZONA 1
1 Unit AC Split
Lokasi : Kasir 1
Kode : IU-AC-L6/L1-Z1-01 Unit 1 7,203,300 600,000 7,203,300
Kapasitas Total (Btu/H : 19100
Type Indoor : Unit AC Wall Mounted
Air Flow : .......... CFM sesuaikan dengan vendor
Daya Listrik (Watt) : 1592
Elektisitas : 220-240/1Phase/50Hz
(Lengkap Wireless Remote,Support,Hanger,Bracket,Dudukan Outdoor
Dan Accessories)

- Instalasi Kabel Power Unit AC Dari PP AC Lt 2 Ke IU-P1/1 m' 6 20,000 2,400 120,000
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²
- Instalasi Kabel Kontrol dari Indoor Unit ke Outdoor Unit m' 5 20,000 2,400 100,000
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²

Instalasi Pipa Refrigerant :


- Pipa Liquid Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/4" m' 5 174,500 30,750 872,500
- Pipa Gas Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/2" m' 5 174,500 30,750 872,500

2 Unit AC Split
Lokasi : Poli TB
Kode : IU-AC-L6/L1-Z1-02 Unit 1 3,250,000 600,000 3,250,000
Kapasitas Total (Btu/H : 7500
Type Indoor : Unit AC Wall Mounted
Air Flow : .......... CFM sesuaikan dengan vendor
Daya Listrik (Watt) : 625
Elektisitas : 220-240/1Phase/50Hz
(Lengkap Wireless Remote,Support,Hanger,Bracket,Dudukan Outdoor
Dan Accessories)

Instalasi Kabel :
- Instalasi Kabel Power Unit AC Dari PP AC Lt 1 Ke IU-P1/2 m' 27 20,000 2,400 540,000
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²
- Instalasi Kabel Kontrol dari Indoor Unit ke Outdoor Unit m' 5 20,000 2,400 100,000
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²

Instalasi Pipa Refrigerant :


- Pipa Liquid Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/4" m' 5 174,500 30,750 872,500
- Pipa Gas Dari Indoor Unit Ke Outdoor Unit d/ Pipa 3/8" m' 5 174,500 30,750 872,500

3 Unit AC Split
Lokasi : R. Tunggu Jenazah
Kode : IU-AC-L6/L1-Z1-03 Unit 1 3,250,000 600,000 3,250,000
Kapasitas Total (Btu/H : 7500
Type Indoor : Unit AC Wall Mounted
Air Flow : .......... CFM sesuaikan dengan vendor
Daya Listrik (Watt) : 625
Elektisitas : 220-240/1Phase/50Hz
(Lengkap Wireless Remote,Support,Hanger,Bracket,Dudukan Outdoor
Dan Accessories)

Instalasi Kabel :
- Instalasi Kabel Power Unit AC Dari PP AC Lt 1 Ke IU-P1/3 m' 18 20,000 2,400 360,000
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²
- Instalasi Kabel Kontrol dari Indoor Unit ke Outdoor Unit m' 13 20,000 2,400 260,000
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²

Instalasi Pipa Refrigerant :


- Pipa Liquid Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/4" m' 13 174,500 30,750 2,268,500
- Pipa Gas Dari Indoor Unit Ke Outdoor Unit d/ Pipa 3/8" m' 13 174,500 30,750 2,268,500

27 Material Bantu lot 1 6,963,090 1,044,464 6,963,090

Sub Total A 30,173,390

B LANTAI 2 (DUA)
Pengadaan Dan Pemasangan Air Cooled Lengkap Dengan Accessories

Sub Total B -

C LANTAI 3 (TIGA)
Pengadaan Dan Pemasangan Air Cooled Lengkap Dengan Accessories
ZONA 1 LANTAI 3
1 Unit AC Split
Lokasi : R. Dokter
Kode : IU-AC-L6/L1-Z1-12 Unit 1 3,250,000 600,000 3,250,000
Page 38 of 113
Kapasitas Total (Btu/H : 7500
Type Indoor : Unit AC Wall Mounted
Air Flow : .......... CFM sesuaikan dengan vendor
Daya Listrik (Watt) : 625
Elektisitas : 380/3Phase/50Hz
(Lengkap Wireless Remote,Support,Hanger,Bracket,Dudukan Outdoor
Dan Accessories)

- Instalasi Kabel : m' 6 20,000 2,400 120,000


Instalasi Kabel Power Unit AC Dari PP AC Lt 2 Ke IU-P2/2
- d/kabel NYM 4 x 4 mm² dlm PVC Conduit Ø 20 mm² m' 5 20,000 2,400 100,000
Instalasi Kabel Kontrol dari Indoor Unit ke Outdoor Unit
d/kabel NYM 4 x 4 mm² dlm PVC Conduit Ø 20 mm²

- Instalasi Pipa Refrigerant : m' 5 174,500 30,750 872,500


- Pipa Liquid Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/4" m' 5 174,500 30,750 872,500
Pipa Gas Dari Indoor Unit Ke Outdoor Unit d/ Pipa 3/8"

2 Unit AC Split
Lokasi : Depo Farmasi
Kode : IU-AC-L1/L1-Z1-39 Unit 1 3,250,000 600,000 3,250,000
Kapasitas Total (Btu/H : 7500
Type Indoor : Unit AC Wall Mounted
Air Flow : .......... CFM sesuaikan dengan vendor
Daya Listrik (Watt) : 625
Elektisitas : 380/3Phase/50Hz
(Lengkap Wireless Remote,Support,Hanger,Bracket,Dudukan Outdoor
Dan Accessories)

Instalasi Kabel :
- Instalasi Kabel Power Unit AC Dari PP AC Lt 2 Ke IU-P2/2 m' 24 20,000 2,400 480,000
d/kabel NYM 4 x 4 mm² dlm PVC Conduit Ø 20 mm²
- Instalasi Kabel Kontrol dari Indoor Unit ke Outdoor Unit m' 5 20,000 2,400 100,000
d/kabel NYM 4 x 4 mm² dlm PVC Conduit Ø 20 mm²

Instalasi Pipa Refrigerant :


- Pipa Liquid Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/4" m' 5 174,500 30,750 872,500
- Pipa Gas Dari Indoor Unit Ke Outdoor Unit d/ Pipa 3/8" m' 5 174,500 30,750 872,500

3 Unit AC Split
Lokasi : Ruang Rawat (RR) L3-Z1-2
Kode : IU-AC-L3/L3-Z1-10 Unit 1 7,203,300 600,000 7,203,300
Kapasitas Total (Btu/H : 15400
Type Indoor : Unit AC Ceiling cassete
Air Flow : .......... CFM sesuaikan dengan vendor
Daya Listrik (Watt) : 1283
Elektisitas : 380/3Phase/50Hz
(Lengkap Wireless Remote,Support,Hanger,Bracket,Dudukan Outdoor
Dan Accessories)

Instalasi Kabel :
- Instalasi Kabel Power Unit AC Dari PP AC Lt 2 Ke IU-P2/2 m' 50 20,000 2,400 1,000,000
d/kabel NYM 4 x 4 mm² dlm PVC Conduit Ø 20 mm²
- Instalasi Kabel Kontrol dari Indoor Unit ke Outdoor Unit m' 16 20,000 2,400 320,000
d/kabel NYM 4 x 4 mm² dlm PVC Conduit Ø 20 mm²

Instalasi Pipa Refrigerant :


- Pipa Liquid Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/4" m' 16 174,500 30,750 2,792,000
- Pipa Gas Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/2" m' 16 174,500 30,750 2,792,000

4 Unit AC Split
Lokasi : Korridoor OK L3-Z1-1
Kode : IU-AC-L3/L3-Z1-11 Unit 1 7,203,300 600,000 7,203,300
Kapasitas Total (Btu/H : 15400
Type Indoor : Unit AC Ceiling cassete
Air Flow : .......... CFM sesuaikan dengan vendor
Daya Listrik (Watt) : 1283
Elektisitas : 380/3Phase/50Hz
(Lengkap Wireless Remote,Support,Hanger,Bracket,Dudukan Outdoor
Dan Accessories)

Instalasi Kabel :
- Instalasi Kabel Power Unit AC Dari PP AC Lt 2 Ke IU-P2/2 m' 42 20,000 2,400 840,000
d/kabel NYM 4 x 4 mm² dlm PVC Conduit Ø 20 mm²
- Instalasi Kabel Kontrol dari Indoor Unit ke Outdoor Unit m' 17 20,000 2,400 340,000
d/kabel NYM 4 x 4 mm² dlm PVC Conduit Ø 20 mm²

Instalasi Pipa Refrigerant :


- Pipa Liquid Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/4" m' 17 174,500 30,750 2,966,500
- Pipa Gas Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/2" m' 17 174,500 30,750 2,966,500

5 Unit AC Split
Lokasi : Operator
Kode : IU-AC-L6/L1-Z1-28 Unit 1 3,250,000 600,000 3,250,000
Kapasitas Total (Btu/H : 7500
Type Indoor : Unit AC Wall Mounted
Air Flow : .......... CFM sesuaikan dengan vendor
Daya Listrik (Watt) : 625
Elektisitas : 380/3Phase/50Hz
(Lengkap Wireless Remote,Support,Hanger,Bracket,Dudukan Outdoor
Dan Accessories)

Instalasi Kabel :
- Instalasi Kabel Power Unit AC Dari PP AC Lt 2 Ke IU-P2/2 m' 30 20,000 2,400 600,000
d/kabel NYM 4 x 4 mm² dlm PVC Conduit Ø 20 mm²
Page 39 of 113
- Instalasi Kabel Kontrol dari Indoor Unit ke Outdoor Unit m' 17 20,000 2,400 340,000
d/kabel NYM 4 x 4 mm² dlm PVC Conduit Ø 20 mm²

Instalasi Pipa Refrigerant :


- Pipa Liquid Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/4" m' 17 174,500 30,750 2,966,500
- Pipa Gas Dari Indoor Unit Ke Outdoor Unit d/ Pipa 3/8" m' 17 174,500 30,750 2,966,500

6 Unit AC Split
Lokasi : PICU
Kode : IU-AC-L3/L3-Z2-23 Unit 1 4,314,700 600,000 4,314,700
Kapasitas Total (Btu/H : 12300
Type Indoor : Unit AC Wall Mounted
Air Flow : .......... CFM sesuaikan dengan vendor
Daya Listrik (Watt) : 1025
Elektisitas : 380/3Phase/50Hz
(Lengkap Wireless Remote,Support,Hanger,Bracket,Dudukan Outdoor
Dan Accessories)

Instalasi Kabel :
- Instalasi Kabel Power Unit AC Dari PP AC Lt 2 Ke IU-P2/2 m' 54 20,000 2,400 1,080,000
d/kabel NYM 4 x 4 mm² dlm PVC Conduit Ø 20 mm²
- Instalasi Kabel Kontrol dari Indoor Unit ke Outdoor Unit m' 17 20,000 2,400 340,000
d/kabel NYM 4 x 4 mm² dlm PVC Conduit Ø 20 mm²

Instalasi Pipa Refrigerant :


- Pipa Liquid Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/4" m' 17 174,500 30,750 2,966,500
- Pipa Gas Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/2" m' 17 174,500 30,750 2,966,500

7 Unit AC Split
Lokasi : Anteroom Unit 1 3,250,000 600,000 3,250,000
Kode : IU-AC-L3/L3-Z2-24
Kapasitas Total (Btu/H : 7500
Type Indoor : Unit AC Wall Mounted
Air Flow : .......... CFM sesuaikan dengan vendor
Daya Listrik (Watt) : 625
Elektisitas : 380/3Phase/50Hz
(Lengkap Wireless Remote,Support,Hanger,Bracket,Dudukan Outdoor
Dan Accessories)

- Instalasi Kabel : m' 116 20,000 2,400 2,320,000


Instalasi Kabel Power Unit AC Dari PP AC Lt 2 Ke IU-P2/2
- d/kabel NYM 4 x 4 mm² dlm PVC Conduit Ø 20 mm² m' 34 20,000 2,400 680,000
Instalasi Kabel Kontrol dari Indoor Unit ke Outdoor Unit
d/kabel NYM 4 x 4 mm² dlm PVC Conduit Ø 20 mm²

Instalasi Pipa Refrigerant : m' 34 174,500 30,750 5,933,000


Pipa Liquid Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/4" m' 34 174,500 30,750 5,933,000
Pipa Gas Dari Indoor Unit Ke Outdoor Unit d/ Pipa 3/8"

8 Unit AC Split
Lokasi : Isolasi Unit 1 3,250,000 600,000 3,250,000
Kode : IU-AC-L6/L1-Z1-16
Kapasitas Total (Btu/H : 7500
Type Indoor : Unit AC Wall Mounted
Air Flow : .......... CFM sesuaikan dengan vendor
Daya Listrik (Watt) : 625
Elektisitas : 380/3Phase/50Hz
(Lengkap Wireless Remote,Support,Hanger,Bracket,Dudukan Outdoor
Dan Accessories)

- Instalasi Kabel : m' 6 20,000 2,400 120,000


Instalasi Kabel Power Unit AC Dari PP AC Lt 2 Ke IU-P2/2
- d/kabel NYM 4 x 4 mm² dlm PVC Conduit Ø 20 mm² m' 5 20,000 2,400 100,000
Instalasi Kabel Kontrol dari Indoor Unit ke Outdoor Unit
d/kabel NYM 4 x 4 mm² dlm PVC Conduit Ø 20 mm²

Instalasi Pipa Refrigerant : m' 5 174,500 30,750 872,500


Pipa Liquid Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/4" m' 5 174,500 30,750 872,500
Pipa Gas Dari Indoor Unit Ke Outdoor Unit d/ Pipa 3/8"

9 Unit AC Split
Lokasi : ICU L3-Z2-1 Unit 1 7,203,300 600,000 7,203,300
Kode : IU-AC-L3/L3-Z2-26
Kapasitas Total (Btu/H : 17100
Type Indoor : Unit AC Ceiling cassete
Air Flow : .......... CFM sesuaikan dengan vendor
Daya Listrik (Watt) : 1425
Elektisitas : 380/3Phase/50Hz
(Lengkap Wireless Remote,Support,Hanger,Bracket,Dudukan Outdoor
Dan Accessories)

- Instalasi Kabel : m' 70 20,000 2,400 1,400,000


Instalasi Kabel Power Unit AC Dari PP AC Lt 2 Ke IU-P2/2
- d/kabel NYM 4 x 4 mm² dlm PVC Conduit Ø 20 mm² m' 5 20,000 2,400 100,000
Instalasi Kabel Kontrol dari Indoor Unit ke Outdoor Unit
d/kabel NYM 4 x 4 mm² dlm PVC Conduit Ø 20 mm²

- Instalasi Pipa Refrigerant : m' 5 174,500 30,750 872,500


- Pipa Liquid Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/4" m' 5 174,500 30,750 872,500
Pipa Gas Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/2"

26 Material Bantu lot 1 14,217,540 2,132,631 14,217,540

Sub Total C 109,001,140

Page 40 of 113
LANTAI 4 (EMPAT)
Pengadaan Dan Pemasangan Air Cooled Lengkap Dengan Accessories

1 Unit AC Split
Lokasi : Kelas 3 L4-1
Kode : IU-AC-L4/L4-Z1-01 Unit 1 10,750,000 600,000 10,750,000
Kapasitas Total (Btu/H : 23200
Type Indoor : Unit AC Wall Mounted
Air Flow : .......... CFM sesuaikan dengan vendor
Daya Listrik (Watt) : 1933
Elektisitas : 380/3Phase/50Hz
(Lengkap Wireless Remote,Support,Hanger,Bracket,Dudukan Outdoor
Dan Accessories)

Instalasi Kabel :
- Instalasi Kabel Power Unit AC Dari PP AC Lt 4 Ke IU-P4.1 m' 6 20,000 2,400 120,000
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²
- Instalasi Kabel Kontrol dari Indoor Unit ke Outdoor Unit m' 5 20,000 2,400 100,000
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²

Instalasi Pipa Refrigerant : m' 6 174,500 30,750 1,047,000


- Pipa Liquid Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/4" m' 6 174,500 30,750 1,047,000
- Pipa Gas Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/2"

2 Unit AC Split
Lokasi : Kelas 2 L4-1
Kode : IU-AC-L4/L4-Z1-02 Unit 1 7,203,300 600,000 7,203,300
Kapasitas Total (Btu/H : 15400
Type Indoor : Unit AC Wall Mounted
Air Flow : .......... CFM sesuaikan dengan vendor
Daya Listrik (Watt) : 1283
Elektisitas : 380/3Phase/50Hz
(Lengkap Wireless Remote,Support,Hanger,Bracket,Dudukan Outdoor
Dan Accessories)

- Instalasi Kabel :
Instalasi Kabel Power Unit AC Dari PP AC Lt 4 Ke IU-P4.1 m' 6 20,000 2,400 120,000
- d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²
Instalasi Kabel Kontrol dari Indoor Unit ke Outdoor Unit m' 5 20,000 2,400 100,000
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²

- Instalasi Pipa Refrigerant : m' 6 174,500 30,750 1,047,000


- Pipa Liquid Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/4" m' 6 174,500 30,750 1,047,000
Pipa Gas Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/2"

3 Unit AC Split
Lokasi : Isolasi L4-1
Kode : IU-AC-L4/L4-Z1-03 Unit 1 3,250,000 600,000 3,250,000
Kapasitas Total (Btu/H : 9600
Type Indoor : Unit AC Wall Mounted
Air Flow : .......... CFM sesuaikan dengan vendor
Daya Listrik (Watt) : 800
Elektisitas : 380/3Phase/50Hz
(Lengkap Wireless Remote,Support,Hanger,Bracket,Dudukan Outdoor
Dan Accessories)

- Instalasi Kabel :
Instalasi Kabel Power Unit AC Dari PP AC Lt 4 Ke IU-P4.1 m' 6 20,000 2,400 120,000
- d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²
Instalasi Kabel Kontrol dari Indoor Unit ke Outdoor Unit m' 5 20,000 2,400 100,000
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²

- Instalasi Pipa Refrigerant : m' 6 174,500 30,750 1,047,000


- Pipa Liquid Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/4" m' 6 174,500 30,750 1,047,000
Pipa Gas Dari Indoor Unit Ke Outdoor Unit d/ Pipa 3/8"

4 Unit AC Split
Lokasi : Anteroom
Kode : IU-AC-L3/L3-Z2-24 Unit 1 3,250,000 600,000 3,250,000
Kapasitas Total (Btu/H : 7500
Type Indoor : Unit AC Wall Mounted
Air Flow : .......... CFM sesuaikan dengan vendor
Daya Listrik (Watt) : 625
Elektisitas : 380/3Phase/50Hz
(Lengkap Wireless Remote,Support,Hanger,Bracket,Dudukan Outdoor
Dan Accessories)

Instalasi Kabel :
- Instalasi Kabel Power Unit AC Dari PP AC Lt 4 Ke IU-P4.1 m' 21 20,000 2,400 420,000
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²
- Instalasi Kabel Kontrol dari Indoor Unit ke Outdoor Unit m' 5 20,000 2,400 100,000
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²

Instalasi Pipa Refrigerant :


- Pipa Liquid Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/4" m' 5 174,500 30,750 872,500
- Pipa Gas Dari Indoor Unit Ke Outdoor Unit d/ Pipa 3/8" m' 5 174,500 30,750 872,500

5 Unit AC Split
Lokasi : SVIP L4-1
Kode : IU-AC-L4/L4-Z1-05 Unit 1 10,750,000 600,000 10,750,000
Kapasitas Total (Btu/H : 23200
Type Indoor : Unit AC Wall Mounted

Page 41 of 113
Air Flow : .......... CFM sesuaikan dengan vendor
Daya Listrik (Watt) : 1933
Elektisitas : 380/3Phase/50Hz
(Lengkap Wireless Remote,Support,Hanger,Bracket,Dudukan Outdoor
Dan Accessories)

- Instalasi Kabel :
Instalasi Kabel Power Unit AC Dari PP AC Lt 4 Ke IU-P4.1 m' 21 20,000 2,400 420,000
- d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²
Instalasi Kabel Kontrol dari Indoor Unit ke Outdoor Unit m' 5 20,000 2,400 100,000
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²

- Instalasi Pipa Refrigerant :


- Pipa Liquid Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/4" m' 5 174,500 30,750 872,500
Pipa Gas Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/2" m' 5 174,500 30,750 872,500

6 Unit AC Split
Lokasi : Kelas 1 L4-1
Kode : IU-AC-L4/L4-Z1-06 Unit 1 7,203,300 600,000 7,203,300
Kapasitas Total (Btu/H : 19100
Type Indoor : Unit AC Wall Mounted
Air Flow : .......... CFM sesuaikan dengan vendor
Daya Listrik (Watt) : 1592
Elektisitas : 380/3Phase/50Hz
(Lengkap Wireless Remote,Support,Hanger,Bracket,Dudukan Outdoor
Dan Accessories)

Instalasi Kabel :
- Instalasi Kabel Power Unit AC Dari PP AC Lt 4 Ke IU-P4.1 m' 21 20,000 2,400 420,000
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²
- Instalasi Kabel Kontrol dari Indoor Unit ke Outdoor Unit m' 5 20,000 2,400 100,000
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²

Instalasi Pipa Refrigerant :


- Pipa Liquid Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/4" m' 5 174,500 30,750 872,500
- Pipa Gas Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/2" m' 5 174,500 30,750 872,500

7 Unit AC Split
Lokasi : Kelas 1 L4-2
Kode : IU-AC-L4/L4-Z1-07 Unit 1 4,314,700 600,000 4,314,700
Kapasitas Total (Btu/H : 12300
Type Indoor : Unit AC Wall Mounted
Air Flow : .......... CFM sesuaikan dengan vendor
Daya Listrik (Watt) : 1025
Elektisitas : 380/3Phase/50Hz
(Lengkap Wireless Remote,Support,Hanger,Bracket,Dudukan Outdoor
Dan Accessories)

- Instalasi Kabel :
Instalasi Kabel Power Unit AC Dari PP AC Lt 4 Ke IU-P4.1 m' 21 20,000 2,400 420,000
- d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²
Instalasi Kabel Kontrol dari Indoor Unit ke Outdoor Unit m' 5 20,000 2,400 100,000
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²

- Instalasi Pipa Refrigerant :


- Pipa Liquid Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/4" m' 5 174,500 30,750 872,500
Pipa Gas Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/2" m' 5 174,500 30,750 872,500

8 Unit AC Split
Lokasi : Kelas 3 L4-2
Kode : IU-AC-L4/L4-Z1-08 Unit 1 7,203,300 600,000 7,203,300
Kapasitas Total (Btu/H : 19100
Type Indoor : Unit AC Wall Mounted
Air Flow : .......... CFM sesuaikan dengan vendor
Daya Listrik (Watt) : 1592
Elektisitas : 380/3Phase/50Hz
(Lengkap Wireless Remote,Support,Hanger,Bracket,Dudukan Outdoor
Dan Accessories)

Instalasi Kabel :
- Instalasi Kabel Power Unit AC Dari PP AC Lt 4 Ke IU-P4.1 m' 21 20,000 2,400 420,000
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²
- Instalasi Kabel Kontrol dari Indoor Unit ke Outdoor Unit m' 5 20,000 2,400 100,000
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²

Instalasi Pipa Refrigerant :


- Pipa Liquid Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/4" m' 5 174,500 30,750 872,500
- Pipa Gas Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/2" m' 5 174,500 30,750 872,500

9 Unit AC Split
Lokasi : SVIP L4-2
Kode : IU-AC-L4/L4-Z1-09 Unit 1 7,203,300 600,000 7,203,300
Kapasitas Total (Btu/H : 15400
Type Indoor : Unit AC Wall Mounted
Air Flow : .......... CFM sesuaikan dengan vendor
Daya Listrik (Watt) : 1283
Elektisitas : 380/3Phase/50Hz
(Lengkap Wireless Remote,Support,Hanger,Bracket,Dudukan Outdoor
Dan Accessories)

- Instalasi Kabel :
Instalasi Kabel Power Unit AC Dari PP AC Lt 4 Ke IU-P4.1 m' 21 20,000 2,400 420,000

Page 42 of 113
- d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²
Instalasi Kabel Kontrol dari Indoor Unit ke Outdoor Unit m' 5 20,000 2,400 100,000
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²

- Instalasi Pipa Refrigerant :


- Pipa Liquid Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/4" m' 5 174,500 30,750 872,500
Pipa Gas Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/2" m' 5 174,500 30,750 872,500

10 Unit AC Split
Lokasi : SVIP L4-3
Kode : IU-AC-L4/L4-Z1-10 Unit 1 7,203,300 600,000 7,203,300
Kapasitas Total (Btu/H : 15400
Type Indoor : Unit AC Wall Mounted
Air Flow : .......... CFM sesuaikan dengan vendor
Daya Listrik (Watt) : 1283
Elektisitas : 380/3Phase/50Hz
(Lengkap Wireless Remote,Support,Hanger,Bracket,Dudukan Outdoor
Dan Accessories)

Instalasi Kabel :
- Instalasi Kabel Power Unit AC Dari PP AC Lt 4 Ke IU-P4.1 m' 21 20,000 2,400 420,000
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²
- Instalasi Kabel Kontrol dari Indoor Unit ke Outdoor Unit m' 5 20,000 2,400 100,000
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²

Instalasi Pipa Refrigerant :


- Pipa Liquid Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/4" m' 5 174,500 30,750 872,500
- Pipa Gas Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/2" m' 5 174,500 30,750 872,500

11 Unit AC Split
Lokasi : VIP 1 L4-1
Kode : IU-AC-L4/L4-Z1-11 Unit 1 4,314,700 600,000 4,314,700
Kapasitas Total (Btu/H : 12300
Type Indoor : Unit AC Wall Mounted
Air Flow : .......... CFM sesuaikan dengan vendor
Daya Listrik (Watt) : 1025
Elektisitas : 380/3Phase/50Hz
(Lengkap Wireless Remote,Support,Hanger,Bracket,Dudukan Outdoor
Dan Accessories)

Instalasi Kabel :
- Instalasi Kabel Power Unit AC Dari PP AC Lt 4 Ke IU-P4.1 m' 21 20,000 2,400 420,000
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²
- Instalasi Kabel Kontrol dari Indoor Unit ke Outdoor Unit m' 5 20,000 2,400 100,000
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²

Instalasi Pipa Refrigerant :


- Pipa Liquid Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/4" m' 5 174,500 30,750 872,500
- Pipa Gas Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/2" m' 5 174,500 30,750 872,500

12 Unit AC Split
Lokasi : Kelas 1A
Kode : IU-AC-L4/L4-Z1-12 Unit 1 4,314,700 600,000 4,314,700
Kapasitas Total (Btu/H : 12300
Type Indoor : Unit AC Wall Mounted
Air Flow : .......... CFM sesuaikan dengan vendor
Daya Listrik (Watt) : 1025
Elektisitas : 380/3Phase/50Hz
(Lengkap Wireless Remote,Support,Hanger,Bracket,Dudukan Outdoor
Dan Accessories)

Instalasi Kabel :
- Instalasi Kabel Power Unit AC Dari PP AC Lt 4 Ke IU-P4.1 m' 21 20,000 2,400 420,000
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²
- Instalasi Kabel Kontrol dari Indoor Unit ke Outdoor Unit m' 5 20,000 2,400 100,000
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²

Instalasi Pipa Refrigerant :


- Pipa Liquid Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/4" m' 5 174,500 30,750 872,500
- Pipa Gas Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/2" m' 5 174,500 30,750 872,500

13 Unit AC Split
Lokasi : VIP 1 L4-2
Kode : IU-AC-L4/L4-Z1-13 Unit 1 4,314,700 600,000 4,314,700
Kapasitas Total (Btu/H : 12300
Type Indoor : Unit AC Wall Mounted
Air Flow : .......... CFM sesuaikan dengan vendor
Daya Listrik (Watt) : 1025
Elektisitas : 380/3Phase/50Hz
(Lengkap Wireless Remote,Support,Hanger,Bracket,Dudukan Outdoor
Dan Accessories)

Instalasi Kabel :
- Instalasi Kabel Power Unit AC Dari PP AC Lt 4 Ke IU-P4.1 m' 21 20,000 2,400 420,000
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²
- Instalasi Kabel Kontrol dari Indoor Unit ke Outdoor Unit m' 5 20,000 2,400 100,000
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²

Instalasi Pipa Refrigerant :


- Pipa Liquid Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/4" m' 5 174,500 30,750 872,500
- Pipa Gas Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/2" m' 5 174,500 30,750 872,500

29 Material Bantu lot 1 16,630,095 2,494,514 16,630,095


Page 43 of 113
TOTAL I 127,497,395

LANTAI 5
Pengadaan Dan Pemasangan Air Cooled Lengkap Dengan Accessories
LANTAI 5 ZONA 1
1 Unit AC Split
Lokasi : Linen Unit 1 3,250,000 600,000 3,250,000
Kode : IU-AC-L5/L5-Z1-01
Kapasitas Total (Btu/H : 7500
Type Indoor : Unit AC Wall Mounted
Air Flow : .......... CFM sesuaikan dengan vendor
Daya Listrik (Watt) : 625
Elektisitas : 380/3Phase/50Hz
(Lengkap Wireless Remote,Support,Hanger,Bracket,Dudukan Outdoor
Dan Accessories)

Instalasi Kabel :
- Instalasi Kabel Power Unit AC Dari PP AC Lt 4 Ke IU-P4.1 m' 15 20,000 2,400 300,000
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²
- Instalasi Kabel Kontrol dari Indoor Unit ke Outdoor Unit m' 15 20,000 2,400 300,000
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²

- Instalasi Pipa Refrigerant :


Pipa Liquid Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/4" m' 15 174,500 30,750 2,617,500
Pipa Gas Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/2" m' 15 174,500 30,750 2,617,500

2 Unit AC Split
Lokasi : Setrika Unit 1 7,203,300 600,000 7,203,300
Kode : IU-AC-L5/L5-Z1-02
Kapasitas Total (Btu/H : 19100
Type Indoor : Unit AC Wall Mounted
Air Flow : .......... CFM sesuaikan dengan vendor
Daya Listrik (Watt) : 1592
Elektisitas : 380/3Phase/50Hz
(Lengkap Wireless Remote,Support,Hanger,Bracket,Dudukan Outdoor
Dan Accessories)

Instalasi Kabel :
- Instalasi Kabel Power Unit AC Dari PP AC Lt 4 Ke IU-P4.1 m' 15 20,000 2,400 300,000
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²
- Instalasi Kabel Kontrol dari Indoor Unit ke Outdoor Unit m' 15 20,000 2,400 300,000
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²

- Instalasi Pipa Refrigerant :


Pipa Liquid Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/4" m' 15 174,500 30,750 2,617,500
Pipa Gas Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/2" m' 15 174,500 30,750 2,617,500

3 Unit AC Split
Lokasi : Laundry Unit 1 7,203,300 600,000 7,203,300
Kode : IU-AC-L5/L5-Z1-03
Kapasitas Total (Btu/H : 19100
Type Indoor : Unit AC Wall Mounted
Air Flow : .......... CFM sesuaikan dengan vendor
Daya Listrik (Watt) : 1592
Elektisitas : 380/3Phase/50Hz
(Lengkap Wireless Remote,Support,Hanger,Bracket,Dudukan Outdoor
Dan Accessories)

Instalasi Kabel :
- Instalasi Kabel Power Unit AC Dari PP AC Lt 4 Ke IU-P4.1 m' 15 20,000 2,400 300,000
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²
- Instalasi Kabel Kontrol dari Indoor Unit ke Outdoor Unit m' 15 20,000 2,400 300,000
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²

- Instalasi Pipa Refrigerant :


Pipa Liquid Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/4" m' 15 174,500 30,750 2,617,500
Pipa Gas Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/2" m' 15 174,500 30,750 2,617,500
-
4 Unit AC Split
Lokasi : Diklat 1 Unit 1 3,250,000 600,000 3,250,000
Kode : IU-AC-L5/L5-Z1-04
Kapasitas Total (Btu/H : 7500
Type Indoor : Unit AC Wall Mounted
Air Flow : .......... CFM sesuaikan dengan vendor
Daya Listrik (Watt) : 625
Elektisitas : 380/3Phase/50Hz
(Lengkap Wireless Remote,Support,Hanger,Bracket,Dudukan Outdoor
Dan Accessories)

Instalasi Kabel :
- Instalasi Kabel Power Unit AC Dari PP AC Lt 4 Ke IU-P4.1 m' 15 20,000 2,400 300,000
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²
- Instalasi Kabel Kontrol dari Indoor Unit ke Outdoor Unit m' 15 20,000 2,400 300,000
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²

- Instalasi Pipa Refrigerant :


Pipa Liquid Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/4" m' 15 174,500 30,750 2,617,500
Pipa Gas Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/2" m' 15 174,500 30,750 2,617,500

5 Unit AC Split
Lokasi : Diklat 2 Unit 1 3,250,000 600,000 3,250,000
Kode : IU-AC-L5/L5-Z1-05

Page 44 of 113
Kapasitas Total (Btu/H : 7500
Type Indoor : Unit AC Wall Mounted
Air Flow : .......... CFM sesuaikan dengan vendor
Daya Listrik (Watt) : 625
Elektisitas : 380/3Phase/50Hz
(Lengkap Wireless Remote,Support,Hanger,Bracket,Dudukan Outdoor
Dan Accessories)

Instalasi Kabel :
- Instalasi Kabel Power Unit AC Dari PP AC Lt 4 Ke IU-P4.1 m' 15 20,000 2,400 300,000
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²
- Instalasi Kabel Kontrol dari Indoor Unit ke Outdoor Unit m' 15 20,000 2,400 300,000
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²

- Instalasi Pipa Refrigerant :


Pipa Liquid Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/4" m' 15 174,500 30,750 2,617,500
Pipa Gas Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/2" m' 15 174,500 30,750 2,617,500

6 Unit AC Split
Lokasi : Dapur L5-Z1-1 Unit 1 7,203,300 600,000 7,203,300
Kode : IU-AC-L5/L5-Z1-06
Kapasitas Total (Btu/H : 15400
Type Indoor : Unit AC Wall Mounted
Air Flow : .......... CFM sesuaikan dengan vendor
Daya Listrik (Watt) : 1283
Elektisitas : 380/3Phase/50Hz
(Lengkap Wireless Remote,Support,Hanger,Bracket,Dudukan Outdoor
Dan Accessories)

Instalasi Kabel :
- Instalasi Kabel Power Unit AC Dari PP AC Lt 4 Ke IU-P4.1 m' 15 20,000 2,400 300,000
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²
- Instalasi Kabel Kontrol dari Indoor Unit ke Outdoor Unit m' 15 20,000 2,400 300,000
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²

- Instalasi Pipa Refrigerant :


Pipa Liquid Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/4" m' 15 174,500 30,750 2,617,500
Pipa Gas Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/2" m' 15 174,500 30,750 2,617,500

7 Unit AC Split
Lokasi : Dapur L5-Z1-2 Unit 1 7,203,300 600,000 7,203,300
Kode : IU-AC-L5/L5-Z1-07
Kapasitas Total (Btu/H : 15400
Type Indoor : Unit AC Wall Mounted
Air Flow : .......... CFM sesuaikan dengan vendor
Daya Listrik (Watt) : 1283
Elektisitas : 380/3Phase/50Hz
(Lengkap Wireless Remote,Support,Hanger,Bracket,Dudukan Outdoor
Dan Accessories)

Instalasi Kabel :
- Instalasi Kabel Power Unit AC Dari PP AC Lt 4 Ke IU-P4.1 m' 15 20,000 2,400 300,000
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²
- Instalasi Kabel Kontrol dari Indoor Unit ke Outdoor Unit m' 15 20,000 2,400 300,000
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²

- Instalasi Pipa Refrigerant :


Pipa Liquid Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/4" m' 15 174,500 30,750 2,617,500
Pipa Gas Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/2" m' 15 174,500 30,750 2,617,500

8 Unit AC Split
Lokasi : Persiapan Unit 1 3,250,000 600,000 3,250,000
Kode : IU-AC-L5/L5-Z1-08
Kapasitas Total (Btu/H : 7500
Type Indoor : Unit AC Wall Mounted
Air Flow : .......... CFM sesuaikan dengan vendor
Daya Listrik (Watt) : 625
Elektisitas : 380/3Phase/50Hz
(Lengkap Wireless Remote,Support,Hanger,Bracket,Dudukan Outdoor
Dan Accessories)

Instalasi Kabel :
- Instalasi Kabel Power Unit AC Dari PP AC Lt 4 Ke IU-P4.1 m' 15 20,000 2,400 300,000
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²
- Instalasi Kabel Kontrol dari Indoor Unit ke Outdoor Unit m' 15 20,000 2,400 300,000
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²

- Instalasi Pipa Refrigerant :


Pipa Liquid Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/4" m' 15 174,500 30,750 2,617,500
Pipa Gas Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/2" m' 15 174,500 30,750 2,617,500

9 Unit AC Split
Lokasi : Koperasi Unit 1 3,250,000 600,000 3,250,000
Kode : IU-AC-L5/L5-Z1-09
Kapasitas Total (Btu/H : 7500
Type Indoor : Unit AC Wall Mounted
Air Flow : .......... CFM sesuaikan dengan vendor
Daya Listrik (Watt) : 625
Elektisitas : 380/3Phase/50Hz
(Lengkap Wireless Remote,Support,Hanger,Bracket,Dudukan Outdoor
Dan Accessories)

Instalasi Kabel :
Page 45 of 113
- Instalasi Kabel Power Unit AC Dari PP AC Lt 4 Ke IU-P4.1 m' 15 20,000 2,400 300,000
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²
- Instalasi Kabel Kontrol dari Indoor Unit ke Outdoor Unit m' 15 20,000 2,400 300,000
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²

- Instalasi Pipa Refrigerant :


Pipa Liquid Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/4" m' 15 174,500 30,750 2,617,500
Pipa Gas Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/2" m' 15 174,500 30,750 2,617,500

10 Unit AC Split
Lokasi : Personalia mutu Unit 1 3,250,000 600,000 3,250,000
Kode : IU-AC-L5/L5-Z1-10
Kapasitas Total (Btu/H : 7500
Type Indoor : Unit AC Wall Mounted
Air Flow : .......... CFM sesuaikan dengan vendor
Daya Listrik (Watt) : 625
Elektisitas : 380/3Phase/50Hz
(Lengkap Wireless Remote,Support,Hanger,Bracket,Dudukan Outdoor
Dan Accessories)

Instalasi Kabel :
- Instalasi Kabel Power Unit AC Dari PP AC Lt 4 Ke IU-P4.1 m' 15 20,000 2,400 300,000
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²
- Instalasi Kabel Kontrol dari Indoor Unit ke Outdoor Unit m' 15 20,000 2,400 300,000
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²

- Instalasi Pipa Refrigerant :


Pipa Liquid Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/4" m' 15 174,500 30,750 2,617,500
Pipa Gas Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/2" m' 15 174,500 30,750 2,617,500

11 Unit AC Split
Lokasi : Adm Umum Unit 1 7,203,300 600,000 7,203,300
Kode : IU-AC-L5/L5-Z1-11
Kapasitas Total (Btu/H : 19100
Type Indoor : Unit AC Wall Mounted
Air Flow : .......... CFM sesuaikan dengan vendor
Daya Listrik (Watt) : 1592
Elektisitas : 380/3Phase/50Hz
(Lengkap Wireless Remote,Support,Hanger,Bracket,Dudukan Outdoor
Dan Accessories)

Instalasi Kabel :
- Instalasi Kabel Power Unit AC Dari PP AC Lt 4 Ke IU-P4.1 m' 15 20,000 2,400 300,000
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²
- Instalasi Kabel Kontrol dari Indoor Unit ke Outdoor Unit m' 15 20,000 2,400 300,000
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²

- Instalasi Pipa Refrigerant :


Pipa Liquid Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/4" m' 15 174,500 30,750 2,617,500
Pipa Gas Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/2" m' 15 174,500 30,750 2,617,500

38 Material Bantu lot 1 17,955,225 2,693,284 17,955,225

TOTAL I 137,656,725

LANTAI 6
Pengadaan Dan Pemasangan Air Cooled Lengkap Dengan Accessories

1 Unit AC Split
Lokasi : HD Isolasi
Kode : IU-AC-L6/L6-Z1-01 Unit 1 3,250,000 600,000 3,250,000
Kapasitas Total (Btu/H : 9600
Type Indoor : Unit AC Wall Mounted
Air Flow : .......... CFM sesuaikan dengan vendor
Daya Listrik (Watt) : 800
Elektisitas : 380/3Phase/50Hz
(Lengkap Wireless Remote,Support,Hanger,Bracket,Dudukan Outdoor
Dan Accessories)

Instalasi Kabel :
- Instalasi Kabel Power Unit AC Dari PP AC Lt 4 Ke IU-P4.1 m' 6 20,000 2,400 120,000
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²
- Instalasi Kabel Kontrol dari Indoor Unit ke Outdoor Unit m' 5 20,000 2,400 100,000
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²

Instalasi Pipa Refrigerant :


- Pipa Liquid Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/4" m' 5 174,500 30,750 872,500
- Pipa Gas Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/2" m' 5 174,500 30,750 872,500

2 Unit AC Split
Lokasi : Hemodialisa L6-Z1-1
Kode : IU-AC-L6/L6-Z1-02 Unit 2 7,203,300 600,000 14,406,600
Kapasitas Total (Btu/H : 19100
Type Indoor : Unit AC Ceiling cassete
Air Flow : .......... CFM sesuaikan dengan vendor
Daya Listrik (Watt) : 1592
Elektisitas : 380/3Phase/50Hz
(Lengkap Wireless Remote,Support,Hanger,Bracket,Dudukan Outdoor
Dan Accessories)

Instalasi Kabel :
- Instalasi Kabel Power Unit AC Dari PP AC Lt 4 Ke IU-P4.1 m' 14 20,000 2,400 280,000

Page 46 of 113
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²
- Instalasi Kabel Kontrol dari Indoor Unit ke Outdoor Unit m' 10 20,000 2,400 200,000
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²

Instalasi Pipa Refrigerant :


- Pipa Liquid Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/4" m' 10 174,500 30,750 1,745,000
- Pipa Gas Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/2" m' 10 174,500 30,750 1,745,000

3 Unit AC Split
Lokasi : Hemodialisa L6-Z1-2
Kode : IU-AC-L6/L6-Z1-03 Unit 1 7,203,300 600,000 7,203,300
Kapasitas Total (Btu/H : 19101
Type Indoor : Unit AC Ceiling cassete
Air Flow : .......... CFM sesuaikan dengan vendor
Daya Listrik (Watt) : 1592
Elektisitas : 380/3Phase/50Hz
(Lengkap Wireless Remote,Support,Hanger,Bracket,Dudukan Outdoor
Dan Accessories)

Instalasi Kabel :
- Instalasi Kabel Power Unit AC Dari PP AC Lt 4 Ke IU-P4.1 m' 14 20,000 2,400 280,000
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²
- Instalasi Kabel Kontrol dari Indoor Unit ke Outdoor Unit m' 5 20,000 2,400 100,000
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²

Instalasi Pipa Refrigerant :


- Pipa Liquid Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/4" m' 5 174,500 30,750 872,500
- Pipa Gas Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/2" m' 5 174,500 30,750 872,500

4 Unit AC Split
Lokasi : RO
Kode : IU-AC-L6/L6-Z1-04 Unit 1 4,314,700 600,000 4,314,700
Kapasitas Total (Btu/H : 12300
Type Indoor : Unit AC Wall Mounted
Air Flow : .......... CFM sesuaikan dengan vendor
Daya Listrik (Watt) : 1025
Elektisitas : 380/3Phase/50Hz
(Lengkap Wireless Remote,Support,Hanger,Bracket,Dudukan Outdoor
Dan Accessories)

Instalasi Kabel :
- Instalasi Kabel Power Unit AC Dari PP AC Lt 4 Ke IU-P4.1 m' 21 20,000 2,400 420,000
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²
- Instalasi Kabel Kontrol dari Indoor Unit ke Outdoor Unit m' 5 20,000 2,400 100,000
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²

Instalasi Pipa Refrigerant :


- Pipa Liquid Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/4" m' 5 174,500 30,750 872,500
- Pipa Gas Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/2" m' 5 174,500 30,750 872,500

5 Unit AC Split
Lokasi : Koridoor & NS L6-Z1-1
Kode : IU-AC-L6/L6-Z1-05 Unit 1 4,314,700 600,000 4,314,700
Kapasitas Total (Btu/H : 12300
Type Indoor : Unit AC Ceiling cassete
Air Flow : .......... CFM sesuaikan dengan vendor
Daya Listrik (Watt) : 1025
Elektisitas : 380/3Phase/50Hz
(Lengkap Wireless Remote,Support,Hanger,Bracket,Dudukan Outdoor
Dan Accessories)

Instalasi Kabel :
- Instalasi Kabel Power Unit AC Dari PP AC Lt 4 Ke IU-P4.1 m' 23 20,000 2,400 460,000
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²
- Instalasi Kabel Kontrol dari Indoor Unit ke Outdoor Unit m' 17 20,000 2,400 340,000
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²

Instalasi Pipa Refrigerant :


- Pipa Liquid Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/4" m' 17 174,500 30,750 2,966,500
- Pipa Gas Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/2" m' 17 174,500 30,750 2,966,500
-
6 Unit AC Split
Lokasi : Koridoor & NS L6-Z1-2
Kode : IU-AC-L6/L6-Z1-06 Unit 1 4,314,700 600,000 4,314,700
Kapasitas Total (Btu/H : 12300
Type Indoor : Unit AC Ceiling cassete
Air Flow : .......... CFM sesuaikan dengan vendor
Daya Listrik (Watt) : 1025
Elektisitas : 380/3Phase/50Hz
(Lengkap Wireless Remote,Support,Hanger,Bracket,Dudukan Outdoor
Dan Accessories)

Instalasi Kabel :
- Instalasi Kabel Power Unit AC Dari PP AC Lt 4 Ke IU-P4.1 m' 30 20,000 2,400 600,000
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²
- Instalasi Kabel Kontrol dari Indoor Unit ke Outdoor Unit m' 17 20,000 2,400 340,000
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²

Instalasi Pipa Refrigerant :


- Pipa Liquid Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/4" m' 17 174,500 30,750 2,966,500
- Pipa Gas Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/2" m' 17 174,500 30,750 2,966,500

Page 47 of 113
7 Unit AC Split
Lokasi : R. Serbaguna
Kode : IU-AC-L6/L6-Z1-07 Unit 1 11,791,000 800,000 11,791,000
Kapasitas Total (Btu/H : 20500
Type Indoor : Unit AC Ceiling cassete
Air Flow : .......... CFM sesuaikan dengan vendor
Daya Listrik (Watt) : 1708
Elektisitas : 380/3Phase/50Hz
(Lengkap Wireless Remote,Support,Hanger,Bracket,Dudukan Outdoor
Dan Accessories)

Instalasi Kabel :
- Instalasi Kabel Power Unit AC Dari PP AC Lt 4 Ke IU-P4.1 m' 19 20,000 2,400 380,000
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²
- Instalasi Kabel Kontrol dari Indoor Unit ke Outdoor Unit m' 17 20,000 2,400 340,000
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²

Instalasi Pipa Refrigerant :


- Pipa Liquid Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/4" m' 17 174,500 30,750 2,966,500
- Pipa Gas Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/2" m' 17 174,500 30,750 2,966,500

8 Unit AC Split
Lokasi : Lobby Lift L6-Z1-1
Kode : IU-AC-L6/L6-Z1-08 Unit 1 11,791,000 800,000 11,791,000
Kapasitas Total (Btu/H : 20500
Type Indoor : Unit AC Ceiling cassete
Air Flow : .......... CFM sesuaikan dengan vendor
Daya Listrik (Watt) : 1708
Elektisitas : 380/3Phase/50Hz
(Lengkap Wireless Remote,Support,Hanger,Bracket,Dudukan Outdoor
Dan Accessories)

Instalasi Kabel :
- Instalasi Kabel Power Unit AC Dari PP AC Lt 4 Ke IU-P4.1 m' 34 20,000 2,400 680,000
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²
- Instalasi Kabel Kontrol dari Indoor Unit ke Outdoor Unit m' 17 20,000 2,400 340,000
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²

Instalasi Pipa Refrigerant :


- Pipa Liquid Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/4" m' 17 174,500 30,750 2,966,500
- Pipa Gas Dari Indoor Unit Ke Outdoor Unit d/ Pipa 1/2" m' 17 174,500 30,750 2,966,500

24 Material Bantu lot 1 14,838,450 2,225,768 14,838,450

TOTAL I 113,761,450

PEMIPAAN DRAIN AC
1 LANTAI SATU
PVC Class AW Lengkap Dengan Isolasi, Hanger, Support, Fitting & Accessories
Sesuai Dengan Spesifikasi Teknis Dan Gambar Perencana
Pipa : Ø 80 mm² (3") m' 24 62,500 9,375 1,500,000
: Ø 65 mm² (2 1/2") m' 21 43,438 6,516 912,188
: Ø 50 mm² (2") m' 113 30,000 4,500 3,390,000
: Ø 40 mm² (1 1/2") m' 98 23,438 3,516 2,296,875
: Ø 25 mm² (1") m' 80 13,750 2,063 1,100,000
: Ø 20 mm² (3/4") m' 348 9,906 1,486 3,447,375

Floor Clean Out (FCO) : Ø 80 mm² (3") bh 2 530,000 52,000 1,060,000


: Ø 65 mm² (2 1/2") bh 1 470,000 50,000 470,000
: Ø 50 mm² (2") bh 2 406,300 31,300 812,600
: Ø 25 mm² (1") bh 5 218,800 25,000 1,094,000

Clean Out (CO) : Ø 50 mm² (2") bh 2 406,300 31,300 812,600


: Ø 40 mm² (1 1/2") bh 2 343,800 25,000 687,600
: Ø 25 mm² (1") bh 3 218,800 22,000 656,400

U-Trap : : Ø 80 mm² (3") bh 2 650,000 75,000 1,300,000


: Ø 65 mm² (2 1/2") bh 1 450,000 55,000 450,000
: Ø 50 mm² (2") bh 3 415,000 50,000 1,245,000
: Ø 25 mm² (1") bh 2 300,000 35,000 600,000
: Ø 20 mm² (3/4") bh 5 215,000 30,000 1,075,000

2 LANTAI DUA
PVC Class AW Lengkap Dengan Isolasi, Hanger, Support, Fitting & Accessories
Sesuai Dengan Spesifikasi Teknis Dan Gambar Perencana
Pipa Ø 80 mm² (3") m' 14 62,500 9,375 875,000
: Ø 65 mm² (2 1/2") m' 28 43,438 6,516 1,216,250
: Ø 50 mm² (2") m' 25 30,000 4,500 750,000
: Ø 40 mm² (1 1/2") m' 36 23,438 3,516 843,750
: Ø 25 mm² (1") m' 14 13,750 2,063 192,500
: Ø 20 mm² (3/4") m' 148 9,906 1,486 1,466,125

Clean Out (CO) : Ø 80 mm² (3") bh 1 530,000 52,000 530,000


: Ø 65 mm² (2 1/2") bh 1 470,000 50,000 470,000
: Ø 40 mm² (1 1/2") bh 4 343,800 31,300 1,375,200

3 LANTAI TIGA
PVC Class AW Lengkap Dengan Isolasi, Hanger, Support, Fitting & Accessories
Sesuai Dengan Spesifikasi Teknis Dan Gambar Perencana
Pipa Ø 65 mm² (2 1/2") m' 23 43,438 6,516 999,063
: Ø 50 mm² (2") m' 93 30,000 4,500 2,790,000
: Ø 40 mm² (1 1/2") m' 130 23,438 3,516 3,046,875
Page 48 of 113
: Ø 25 mm² (1") m' 70 13,750 2,063 962,500
: Ø 20 mm² (3/4") m' 136 9,906 1,486 1,347,250

Clean Out (CO) : Ø 65 mm² (2 1/2") bh 1 470,000 50,000 470,000


: Ø 50 mm² (2") bh 1 406,300 31,300 406,300
: Ø 40 mm² (1 1/2") bh 4 343,800 25,000 1,375,200
: Ø 25 mm² (1") bh 7 218,800 22,000 1,531,600

4 LANTAI EMPAT
PVC Class AW Lengkap Dengan Isolasi, Hanger, Support, Fitting & Accessories
Sesuai Dengan Spesifikasi Teknis Dan Gambar Perencana
Pipa : Ø 50 mm² (2") m' 32 30,000 4,500 960,000
: Ø 40 mm² (1 1/2") m' 33 23,438 3,516 773,438
: Ø 25 mm² (1") m' 8 13,750 2,063 110,000
: Ø 20 mm² (3/4") m' 52 9,906 1,486 515,125

Clean Out (CO) Ø 50 mm² (2") bh 1 406,300 31,300 406,300


: Ø 40 mm² (1 1/2") bh 3 343,800 25,000 1,031,400
: Ø 25 mm² (1") bh 1 218,800 22,000 218,800

5 LANTAI LIMA
PVC Class AW Lengkap Dengan Isolasi, Hanger, Support, Fitting & Accessories
Sesuai Dengan Spesifikasi Teknis Dan Gambar Perencana
Pipa : Ø 50 mm² (2") m' 32 30,000 4,500 960,000
: Ø 40 mm² (1 1/2") m' 33 23,438 3,516 773,438
: Ø 25 mm² (1") m' 8 13,750 2,063 110,000
: Ø 20 mm² (3/4") m' 52 9,906 1,486 515,125

Clean Out (CO) Ø 50 mm² (2") bh 1 406,300 31,300 406,300


: Ø 40 mm² (1 1/2") bh 3 343,800 25,000 1,031,400
: Ø 25 mm² (1") bh 1 218,800 22,000 218,800

6 LANTAI ENAM
PVC Class AW Lengkap Dengan Isolasi, Hanger, Support, Fitting & Accessories
Sesuai Dengan Spesifikasi Teknis Dan Gambar Perencana
Pipa : Ø 50 mm² (2") m' 32 30,000 4,500 960,000
: Ø 40 mm² (1 1/2") m' 33 23,438 3,516 773,438
: Ø 25 mm² (1") m' 8 13,750 2,063 110,000
: Ø 20 mm² (3/4") m' 52 9,906 1,486 515,125

Clean Out (CO) Ø 50 mm² (2") bh 1 406,300 31,300 406,300


: Ø 40 mm² (1 1/2") bh 3 343,800 25,000 1,031,400
: Ø 25 mm² (1") bh 1 218,800 22,000 218,800

Sub Total II 55,602,438

PENGADAAN DAN PEMASANGAN UNIT EXHAUST FAN DAN INSTALASI DUCTING


AREA SITEPLAN

1 UNIT EXHAUST FAN R. POWER HOUSE

a Kode Gambar : EF (W)-Gardu PLN.1 unit 1 3,500,000 190,000 3,500,000


Kapasitas : 509 CFM
Static Pressure : 0.2" wg

b Kode Gambar : EF (W)-Trafo.2 unit 1 3,500,000 190,000 3,500,000


Kapasitas : 509 CFM
Static Pressure : 0.2" wg

c Kode Gambar : EF (W)-Gardu Konsumen.3 unit 1 3,900,000 250,000 3,900,000


Kapasitas : 643 CFM
Static Pressure : 0.2" wg

2 UNIT EXHAUST FAN R. POMPA

a Kode Gambar : EF -R. Pompa.1 unit 1 5,900,000 250,000 5,900,000


Kapasitas : 1.550 CFM
Static Pressure : 8" wg

b Kode Gambar : FA-R. Pompa.1 unit 1 5,550,000 250,000 5,550,000


Kapasitas : 1.000 CFM
Static Pressure : 8" wg

2 UNIT EF R.NUSAPALA & CLEANING SERVICE


Kode Gambar : EC-80 CFM unit 2 650,000 120,000 1,300,000

3 PENGADAAN DAN PEMASANGAN INSTALASI EXHAUST CEILING (EC)


PVC Class AW Lengkap Dengan Isolasi, Hanger, Support, Fitting & Accessories
Sesuai Dengan Spesifikasi Teknis Dan Gambar Perencana

a Pipa : Ø 100 mm (4") m' 8 101,563 15,234 812,500

b EAG : 300 x 150 mm² EF(C) bh 1 255,000 45,000 255,000

4 INSTALASI KABEL POWER EXHAUST FAN

AREA R. POWER HOUSE

a Instalasi Kabel Exhaust Fan Wall Gardu PLN.1 m' 14 20,000 2,400 280,000
d/kabel NYM 3x2,5 mm² dlm PVC HI Conduit 20mm²

b Instalasi Kabel Exhaust Fan Wall Trafo.2 m' 10 20,000 2,400 200,000
Page 49 of 113
d/kabel NYM 3x2,5 mm² dlm PVC HI Conduit 20mm²

d Instalasi Kabel Exhaust Fan Wall Gardu Konsumen.3 m' 8 20,000 2,400 160,000
d/kabel NYM 3x2,5 mm² dlm PVC HI Conduit 20mm²

AREA R. POMPA

a Instalasi Kabel Exhaust Fan R. Pompa.1 m' 12 20,000 2,400 240,000


d/kabel NYM 3x2,5 mm² dlm PVC HI Conduit 20mm²

b Instalasi Kabel Fresh Air Fan R. Pompa.1 m' 9 20,000 2,400 180,000
d/kabel NYM 3x2,5 mm² dlm PVC HI Conduit 20mm²

c Instalasi Kabel Exhaust Fan Toilet (EC) ttk 2 20,000 2,400 40,000
d/kabel NYM 3x2,5 mm² dlm PVC HI Conduit 20mm²

Sub Total III 25,817,500

PENGADAAN DAN PEMASANGAN UNIT EXHAUST FAN DAN INSTALASI DUCTING


LANTAI 1

1 UNIT EXHAUST FAN

a Exhaust Fan (EF)


Kode Gambar : EF-PANEL.1 unit 1 5,265,000 190,000 5,265,000
Kapasitas : 800 CFM
Static Pressure : 1" wg

b Kode Gambar : EF-PANEL.2 unit 1 5,450,000 250,000 5,450,000


Kapasitas : 1.100 CFM
Static Pressure : 1" wg

c Kode Gambar : EF (W)-R. Isolasi.1 unit 1 1,560,000 200,000 1,560,000


Kapasitas : 250 CFM
Static Pressure : 0.2" wg

d Kode Gambar : EF (W)-R. Tunggu.2 unit 1 1,560,000 200,000 1,560,000


Kapasitas : 250 CFM
Static Pressure : 0.2" wg

e Exhaust Fan (Ceiling)


Kode Gambar : EC-250 CFM unit 2 1,560,000 200,000 3,120,000
: EC-200 CFM unit 1 1,250,000 190,000 1,250,000
: EC-50 CFM unit 23 606,300 93,800 13,944,900

2 PENGADAAN DAN PEMASANGAN INSTALASI EXHAUST CEILING (EC)


PVC Class AW Lengkap Dengan Isolasi, Hanger, Support, Fitting & Accessories
Sesuai Dengan Spesifikasi Teknis Dan Gambar Perencana

a Pipa : Ø 200 mm (8") m' 16 378,125 56,719 6,050,000


: Ø 150 mm (6") m' 39 234,000 35,100 9,126,000
: Ø 100 mm (4") m' 90 101,563 15,234 9,140,625

b Louvre Grille : 400 x 300 mm² bh 2 443,700 95,000 887,400

c EAG : 250 x 250 mm² EF(C) bh 26 510,000 45,000 13,260,000

3 INSTALASI DUCTING EXHAUST FAN


Lengkap Dengan,Support,Hanger,Accessories & Peralatan Bantu Lainnya
Sesuai Dengan Spesifikasi Teknis Dan Gambar Perencana
dengan Ducting BJLS 80
Dimensi : 300 x 200 mm² m' 2 252,000 93,000 504,000

4 INSTALASI KABEL POWER EXHAUST FAN

a Instalasi Kabel Exhaust Fan Panel.1 m' 8 20,000 2,400 160,000


d/kabel NYM 3x2,5 mm² dlm PVC HI Conduit 20mm²

b Instalasi Kabel Exhaust Fan Panel.2 m' 77 20,000 2,400 1,540,000


d/kabel NYM 3x2,5 mm² dlm PVC HI Conduit 20mm²

c Instalasi Kabel Exhaust Fan Wall R. Isolasi.1 m' 40 20,000 2,400 800,000
d/kabel NYM 3x2,5 mm² dlm PVC HI Conduit 20mm²

d Instalasi Kabel Exhaust Fan Wall R. Tunggu.2 m' 53 20,000 2,400 1,060,000
d/kabel NYM 3x2,5 mm² dlm PVC HI Conduit 20mm²

Sub Total III 74,677,925

PENGADAAN DAN PEMASANGAN UNIT EXHAUST FAN DAN INSTALASI DUCTING


LANTAI 2

1 UNIT EXHAUST FAN

a Exhaust Fan (EF)


Kode Gambar : EF-DAK BETON.1 unit 1 4,212,000 250,000 4,212,000
Kapasitas : 750 CFM
Static Pressure : 1" wg

b Kode Gambar : EF-TOILET.1 unit 1 5,265,000 190,000 5,265,000


Kapasitas : 800 CFM
Static Pressure : 1" wg
Page 50 of 113
c Kode Gambar : EF-r.tunggu ktk.4 unit 1 3,790,800 225,000 3,790,800
Kapasitas : 700 CFM
Static Pressure : 1" wg

b Exhaust Fan (EF)


Kode Gambar : EF-r.panel.3 unit 1 5,265,000 190,000 5,265,000
Kapasitas : 800 CFM
Static Pressure : 1" wg

c Kode Gambar : EF (W)-R. Isolasi A TT.1 unit 1 1,560,000 200,000 1,560,000


Kapasitas : 250 CFM
Static Pressure : 0.2" wg

2 PENGADAAN DAN PEMASANGAN INSTALASI EXHAUST CEILING (EC)


PVC Class AW Lengkap Dengan Isolasi, Hanger, Support, Fitting & Accessories
Sesuai Dengan Spesifikasi Teknis Dan Gambar Perencana

a Pipa : Ø 200 mm (8") m' 24 378,125 56,719 9,075,000


: Ø 150 mm (6") m' 60 234,000 35,100 14,040,000
: Ø 100 mm (4") m' 65 101,563 15,234 6,601,563

b Louvre Grille : 400 x 300 mm² bh 1 443,700 95,000 443,700


: 300 x 300 mm² bh 1 399,330 95,000 399,330
: 300 x 200 mm² bh 1 359,397 95,000 359,397
: 250 x 250 mm² bh 1 323,457 95,000 323,457

c EAG : 250 x 250 mm² EF(C) bh 36 510,000 45,000 18,360,000

3 INSTALASI DUCTING EXHAUST FAN


Lengkap Dengan,Support,Hanger,Accessories & Peralatan Bantu Lainnya
Sesuai Dengan Spesifikasi Teknis Dan Gambar Perencana
dengan Ducting BJLS 80
Dimensi : 300 x 200 mm² m' 4 252,000 93,000 1,008,000

4 INSTALASI KABEL POWER EXHAUST FAN

a Instalasi Kabel Exhaust Fan Toilet.1 m' 78 20,000 2,400 1,560,000


d/kabel NYM 3x2,5 mm² dlm PVC HI Conduit 20mm²

b Instalasi Kabel Exhaust Fan Dak.Beton.2 m' 41 20,000 2,400 820,000


d/kabel NYM 3x2,5 mm² dlm PVC HI Conduit 20mm²

c Instalasi Kabel Exhaust Fan R.Panel.3 m' 8 20,000 2,400 160,000


d/kabel NYM 3x2,5 mm² dlm PVC HI Conduit 20mm²

d Instalasi Kabel Exhaust Fan Wall R.Isolasi m' 43 20,000 2,400 860,000
d/kabel NYM 3x2,5 mm² dlm PVC HI Conduit 20mm²

Sub Total III 74,103,247

LANTAI 3

1 UNIT EXHAUST FAN

a Exhaust Fan (EF)


Kode Gambar : EF-R.PANEL.1 unit 1 6,054,750 218,500 6,054,750
Kapasitas : 850 CFM
Static Pressure : 1" wg

b Kode Gambar : EF-DAK BETON.2 unit 1 3,500,000 190,000 3,500,000


Kapasitas : 500 CFM
Static Pressure : 1" wg

c Kode Gambar : EF-R.PANEL.1 unit 1 7,080,000 300,000 7,080,000


Kapasitas : 1.780 CFM
Static Pressure : 1" wg

d Kode Gambar : EF-DAK BALKON.4 unit 1 3,900,000 250,000 3,900,000


Kapasitas : 600 CFM
Static Pressure : 1" wg

e Kode Gambar : EF (W)-Isolasi Anak unit 1 1,560,000 200,000 1,560,000


Kapasitas : 250 CFM
Static Pressure : 0.2" wg

f Kode Gambar : EF (W)-Isolasi.2 unit 1 1,560,000 200,000 1,560,000


Kapasitas : 250 CFM
Static Pressure : 0.2" wg

g Kode Gambar : EF (W)-Kompor.3 unit 1 3,500,000 190,000 3,500,000


Kapasitas : 500 CFM
Static Pressure : 0.8" wg

2 PENGADAAN DAN PEMASANGAN INSTALASI EXHAUST CEILING (EC)


PVC Class AW Lengkap Dengan Isolasi, Hanger, Support, Fitting & Accessories
Sesuai Dengan Spesifikasi Teknis Dan Gambar Perencana

a Pipa : Ø 200 mm (8") m' 37 378,125 56,719 13,990,625


: Ø 150 mm (6") m' 57 234,000 35,100 13,338,000
: Ø 100 mm (4") m' 138 101,563 15,234 14,015,625
Page 51 of 113
b Louvre Grille : 400 x 300 mm² bh 4 443,700 95,000 1,774,800

c EAG : 250 x 250 mm² EF(C) bh 46 510,000 45,000 23,460,000

3 INSTALASI DUCTING EXHAUST FAN


Lengkap Dengan,Support,Hanger,Accessories & Peralatan Bantu Lainnya
Sesuai Dengan Spesifikasi Teknis Dan Gambar Perencana
dengan Ducting BJLS 80
Dimensi : 300 x 200 mm² m' 4 252,000 93,000 1,008,000

4 INSTALASI KABEL POWER EXHAUST FAN

a Instalasi Kabel Exhaust Fan Dak.Balkon.1 m' 8 20,000 2,400 160,000


d/kabel NYM 3x2,5 mm² dlm PVC HI Conduit 20mm²

b Instalasi Kabel Exhaust Fan Dak.Balkon.2 m' 60 20,000 2,400 1,200,000


d/kabel NYM 3x2,5 mm² dlm PVC HI Conduit 20mm²

c Instalasi Kabel Exhaust Fan Dak.Balkon.3 m' 74 20,000 2,400 1,480,000


d/kabel NYM 3x2,5 mm² dlm PVC HI Conduit 20mm²

d Instalasi Kabel Exhaust Fan Dak.Balkon.4 m' 36 20,000 2,400 720,000


d/kabel NYM 3x2,5 mm² dlm PVC HI Conduit 20mm²

e Instalasi Kabel Exhaust Fan Wall Isolasi Anak.1 m' 22 20,000 2,400 440,000
d/kabel NYM 3x2,5 mm² dlm PVC HI Conduit 20mm²

f Instalasi Kabel Exhaust Fan Wall Isolasi.2 m' 31 20,000 2,400 620,000
d/kabel NYM 3x2,5 mm² dlm PVC HI Conduit 20mm²

g Instalasi Kabel Exhaust Fan Wall Kompor.3 m' 67 20,000 2,400 1,340,000
d/kabel NYM 3x2,5 mm² dlm PVC HI Conduit 20mm²

Sub Total III 100,701,800

LANTAI 4

1 UNIT EXHAUST FAN

a Exhaust Fan (EF)


Kode Gambar : EF-PANEL.1 unit 1 6,054,750 218,500 6,054,750
Kapasitas : 850 CFM
Static Pressure : 1" wg

b Kode Gambar : EF-DAK BALKON.2 unit 1 5,995,000 275,000 5,995,000


Kapasitas : 1.200 CFM
Static Pressure : 1" wg

c Kode Gambar : EF (W)-Isolasi Ibu Umum.1 unit 1 1,560,000 200,000 1,560,000


Kapasitas : 250 CFM
Static Pressure : 0.2" wg

d Kode Gambar : EF (W)-Setrika.2 unit 1 2,184,000 280,000 2,184,000


Kapasitas : 300 CFM
Static Pressure : 0.2" wg

2 PENGADAAN DAN PEMASANGAN INSTALASI EXHAUST CEILING (EC)


PVC Class AW Lengkap Dengan Isolasi, Hanger, Support, Fitting & Accessories
Sesuai Dengan Spesifikasi Teknis Dan Gambar Perencana

a Pipa : Ø 200 mm (8") m' 41 378,125 56,719 15,503,125


: Ø 150 mm (6") m' 21 234,000 35,100 4,914,000
: Ø 100 mm (4") m' 55 101,563 15,234 5,585,938

b Louvre Grille : 400 x 300 mm² bh 2 443,700 95,000 887,400

c EAG : 250 x 250 mm² EF(C) bh 24 510,000 45,000 12,240,000

3 INSTALASI DUCTING EXHAUST FAN


Lengkap Dengan,Support,Hanger,Accessories & Peralatan Bantu Lainnya
Sesuai Dengan Spesifikasi Teknis Dan Gambar Perencana
dengan Ducting BJLS 80
Dimensi : 300 x 200 mm² m' 2 252,000 93,000 504,000

4 INSTALASI KABEL POWER EXHAUST FAN

a Instalasi Kabel Exhaust R.PANEL.1 m' 8 20,000 2,400 160,000


d/kabel NYM 3x2,5 mm² dlm PVC HI Conduit 20mm²

b Instalasi Kabel Exhaust Fan Dak.Balkon.2 m' 42 20,000 2,400 840,000


d/kabel NYM 3x2,5 mm² dlm PVC HI Conduit 20mm²

c Instalasi Kabel Exhaust Fan Wall Isolasi Ibu Umum.1 m' 21 20,000 2,400 420,000
d/kabel NYM 3x2,5 mm² dlm PVC HI Conduit 20mm²

d Instalasi Kabel Exhaust Fan Wall Setrika.2 m' 50 20,000 2,400 1,000,000
d/kabel NYM 3x2,5 mm² dlm PVC HI Conduit 20mm²

Sub Total III 57,848,213

Page 52 of 113
LANTAI 5

1 UNIT EXHAUST FAN

a Exhaust Fan (EF)


Kode Gambar : EF-PANEL.1 unit 1 6,054,750 218,500 6,054,750
Kapasitas : 850 CFM
Static Pressure : 1" wg

b Kode Gambar : EF-DAK BALKON.2 unit 1 5,995,000 275,000 5,995,000


Kapasitas : 1.200 CFM
Static Pressure : 1" wg

c Kode Gambar : EF (W)-Isolasi Ibu Umum.1 unit 1 1,560,000 200,000 1,560,000


Kapasitas : 250 CFM
Static Pressure : 0.2" wg

d Kode Gambar : EF (W)-Setrika.2 unit 1 2,184,000 280,000 2,184,000


Kapasitas : 300 CFM
Static Pressure : 0.2" wg

2 PENGADAAN DAN PEMASANGAN INSTALASI EXHAUST CEILING (EC)


PVC Class AW Lengkap Dengan Isolasi, Hanger, Support, Fitting & Accessories
Sesuai Dengan Spesifikasi Teknis Dan Gambar Perencana

a Pipa : Ø 200 mm (8") m' 41 378,125 56,719 15,503,125


: Ø 150 mm (6") m' 21 234,000 35,100 4,914,000
: Ø 100 mm (4") m' 55 101,563 15,234 5,585,938

b Louvre Grille : 400 x 300 mm² bh 2 443,700 95,000 887,400

c EAG : 250 x 250 mm² EF(C) bh 24 510,000 45,000 12,240,000

3 INSTALASI DUCTING EXHAUST FAN


Lengkap Dengan,Support,Hanger,Accessories & Peralatan Bantu Lainnya
Sesuai Dengan Spesifikasi Teknis Dan Gambar Perencana
dengan Ducting BJLS 80
Dimensi : 300 x 200 mm² m' 2 252,000 93,000 504,000

4 INSTALASI KABEL POWER EXHAUST FAN

a Instalasi Kabel Exhaust R.PANEL.1 m' 8 20,000 2,400 160,000


d/kabel NYM 3x2,5 mm² dlm PVC HI Conduit 20mm²

b Instalasi Kabel Exhaust Fan Dak.Balkon.2 m' 42 20,000 2,400 840,000


d/kabel NYM 3x2,5 mm² dlm PVC HI Conduit 20mm²

c Instalasi Kabel Exhaust Fan Wall Isolasi Ibu Umum.1 m' 21 20,000 2,400 420,000
d/kabel NYM 3x2,5 mm² dlm PVC HI Conduit 20mm²

d Instalasi Kabel Exhaust Fan Wall Setrika.2 m' 50 20,000 2,400 1,000,000
d/kabel NYM 3x2,5 mm² dlm PVC HI Conduit 20mm²

Sub Total III 57,848,213

LANTAI 6

1 UNIT EXHAUST FAN

a Exhaust Fan (EF)


Kode Gambar : EF-PANEL.1 unit 1 6,054,750 218,500 6,054,750
Kapasitas : 850 CFM
Static Pressure : 1" wg

b Kode Gambar : EF-DAK BALKON.2 unit 1 5,995,000 275,000 5,995,000


Kapasitas : 1.200 CFM
Static Pressure : 1" wg

c Kode Gambar : EF (W)-Isolasi Ibu Umum.1 unit 1 1,560,000 200,000 1,560,000


Kapasitas : 250 CFM
Static Pressure : 0.2" wg

d Kode Gambar : EF (W)-Setrika.2 unit 1 2,184,000 280,000 2,184,000


Kapasitas : 300 CFM
Static Pressure : 0.2" wg

2 PENGADAAN DAN PEMASANGAN INSTALASI EXHAUST CEILING (EC)


PVC Class AW Lengkap Dengan Isolasi, Hanger, Support, Fitting & Accessories
Sesuai Dengan Spesifikasi Teknis Dan Gambar Perencana

a Pipa : Ø 200 mm (8") m' 41 378,125 56,719 15,503,125


: Ø 150 mm (6") m' 21 234,000 35,100 4,914,000
: Ø 100 mm (4") m' 55 101,563 15,234 5,585,938

b Louvre Grille : 400 x 300 mm² bh 2 443,700 95,000 887,400

c EAG : 250 x 250 mm² EF(C) bh 24 510,000 45,000 12,240,000

3 INSTALASI DUCTING EXHAUST FAN


Lengkap Dengan,Support,Hanger,Accessories & Peralatan Bantu Lainnya
Sesuai Dengan Spesifikasi Teknis Dan Gambar Perencana
dengan Ducting BJLS 80
Page 53 of 113
Dimensi : 300 x 200 mm² m' 2 252,000 93,000 504,000

4 INSTALASI KABEL POWER EXHAUST FAN

a Instalasi Kabel Exhaust R.PANEL.1 m' 8 20,000 2,400 160,000


d/kabel NYM 3x2,5 mm² dlm PVC HI Conduit 20mm²

b Instalasi Kabel Exhaust Fan Dak.Balkon.2 m' 42 20,000 2,400 840,000


d/kabel NYM 3x2,5 mm² dlm PVC HI Conduit 20mm²

c Instalasi Kabel Exhaust Fan Wall Isolasi Ibu Umum.1 m' 21 20,000 2,400 420,000
d/kabel NYM 3x2,5 mm² dlm PVC HI Conduit 20mm²

d Instalasi Kabel Exhaust Fan Wall Setrika.2 m' 50 20,000 2,400 1,000,000
d/kabel NYM 3x2,5 mm² dlm PVC HI Conduit 20mm²

Sub Total III 57,848,213

Total Pekerjaan VAC 1,022,537,647


1,083,772,346

Page 54 of 113
TOTAL HARGA
Upah
(Rp.)

600,000 4712000 569600

14,400 145320 19618.2

12,000 121100 16348.5

153,750 663500 115000


153,750 676000 123000

600,000 3781000 569600

64,800 653940 88281.9

12,000 121100 16348.5

153,750 663500 115000


153,750 676000 123000

600,000 3781000 569600

43,200 435960 58854.6

31,200 314860 42506.1

399,750 1725100 299000


399,750 1757600 319800

1,044,464 3500000 1500000

4,436,564

600,000 4712000 569600


Page 55 of 113
14,400 145320 19618.2

12,000 121100 16348.5

153,750 663500 115000


153,750 676000 123000

600,000 4712000 569600

57,600 971856 301104

12,000 202470 62730

153,750 663500 115000


153,750 688500 127500

600,000 4712000 569600

120,000 2024700 627300

38,400 647904 200736

492,000 2123200 368000


492,000 2203200 408000

600,000 4712000 569600

100,800 1700748 526932

40,800 688398 213282

522,750 2255900 391000


522,750 2340900 433500

600,000 4712000 569600

72,000 1214820 376380

Page 56 of 113
40,800 688398 213282

522,750 2255900 391000


522,750 2340900 433500

600,000 4712000 569600

129,600 2186676 677484

40,800 688398 213282

522,750 2255900 391000


522,750 2340900 433500

600,000 7562000 1139200

278,400 2809520 379285.2

81,600 823480 111169.8

1,045,500 4511800 782000


1,045,500 4596800 836400

600,000 3781000 569600

14,400 145320 19618.2

12,000 121100 16348.5

153,750 663500 115000


153,750 676000 123000

600,000 3781000 569600

168,000 1695400 228879

12,000 121100 16348.5

153,750 663500 115000


153,750 676000 123000

2,132,631 3500000 1500000

16,219,731

Page 57 of 113
600,000 4712000 569600

145320 19618.2
14,400
121100 16348.5
12,000

184,500 663500 115000


184,500 676000 123000

600,000 9424000 1139200

339080 45775.8
14,400
242200 32697
12,000

184,500 1327000 230000


184,500 1377000 255000

600,000 4712000 569600

339080 45775.8
14,400
121100 16348.5
12,000

184,500 663500 115000


184,500 676000 123000

600,000 4712000 569600

50,400 508620 68663.7

12,000 121100 16348.5

153,750 663500 115000


153,750 688500 127500

600,000 4712000 569600

Page 58 of 113
557060 75203.1
50,400
411740 55584.9
12,000

2255900 391000
153,750 2298400 418200
153,750

600,000 4712000 569600

50,400 726600 98091

12,000 411740 55584.9

153,750 2255900 391000


153,750 2340900 433500

600,000 4712000 569600

460180 62124.3
50,400
411740 55584.9
12,000

2255900 391000
153,750 2340900 433500
153,750

600,000 4712000 569600

50,400 823480 111169.8

12,000 411740 55584.9

153,750 2255900 391000


153,750 2340900 433500

600,000 9424000 1139200

1622740 219069.9
50,400

Page 59 of 113
387520 52315.2
12,000

2123200 368000
153,750 2163200 393600
153,750

600,000 12540000 1139200

50,400 1550080 209260.8

12,000 363300 49045.5

153,750 2028000 369000


153,750 2142000 394500

600,000 3781000 569600

1041460 140597.1
50,400
121100 16348.5
12,000

663500 115000
153,750 676000 123000
153,750

600,000 36450000 4583300

50,400 2280600 526932


1140300 263466
12,000

2839200 516600
3139500 609000
153,750
153,750

600,000 36450000 4583300

50,400 2280600 526932


1140300 263466
12,000

2839200 516600
3139500 609000
153,750
153,750

2,494,514 3000000 1500000


Page 60 of 113
15,179,714

600,000 4712000 569600

145320 19618.2

36,000 121100 16348.5

36,000

663500 115000
676000 123000
461,250
461,250

600,000 4712000 569600

145320 19618.2

36,000 121100 16348.5

36,000

663500 115000
676000 123000
461,250
461,250

600,000 4712000 569600

145320 19618.2

36,000 121100 16348.5

36,000

663500 115000
676000 123000
461,250
461,250

600,000 4712000 569600

145320 19618.2

36,000 121100 16348.5

36,000

663500 115000
676000 123000
461,250
461,250

600,000 4712000 569600

Page 61 of 113
145320 19618.2

36,000 121100 16348.5

36,000

663500 115000
676000 123000
461,250
461,250

600,000 4712000 569600

145320 19618.2

36,000 121100 16348.5

36,000

663500 115000
676000 123000
461,250
461,250

600,000 4712000 569600

145320 19618.2

36,000 121100 16348.5

36,000

663500 115000
676000 123000
461,250
461,250

600,000 4712000 569600

145320 19618.2

36,000 121100 16348.5

36,000

663500 115000
676000 123000
461,250
461,250

600,000 4712000 569600

145320 19618.2

Page 62 of 113
36,000 121100 16348.5

36,000

663500 115000
676000 123000
461,250
461,250

600,000 4712000 569600

145320 19618.2

36,000 121100 16348.5

36,000

663500 115000
676000 123000
461,250
461,250

600,000 4712000 569600

145320 19618.2

36,000 121100 16348.5

36,000

663500 115000
676000 123000
461,250
461,250

2,693,284 3000000 1500000

20,232,784

600,000 4712000 569600

14,400 145320 19618.2

12,000 121100 16348.5

153,750 663500 115000


153,750 676000 123000

1,200,000 9424000 1139200

33,600 339080 45775.8

Page 63 of 113
24,000 242200 32697

307,500 1327000 230000


307,500 1377000 255000

600,000 4712000 569600

33,600 339080 45775.8

12,000 121100 16348.5

153,750 663500 115000


153,750 676000 123000

600,000 4712000 569600

50,400 508620 68663.7

12,000 121100 16348.5

153,750 663500 115000


153,750 688500 127500

600,000 4712000 569600

55,200 557060 75203.1

40,800 411740 55584.9

522,750 2255900 391000


522,750 2298400 418200

600,000 4712000 569600

72,000 726600 98091

40,800 411740 55584.9

522,750 2255900 391000


522,750 2340900 433500

Page 64 of 113
800,000 4712000 569600

45,600 460180 62124.3

40,800 411740 55584.9

522,750 2255900 391000


522,750 2340900 433500

800,000 4712000 569600

81,600 823480 111169.8

40,800 411740 55584.9

522,750 2255900 391000


522,750 2340900 433500

2,225,768 3000000 1500000

14,354,868

225,000 2687040 937440


136,828 1871100 409500
508,500 8298720 2420460
344,531 5027400 1446480
165,000 1955808 823824
517,106 6028473.6 2052086.4

104,000 223920 78120


50,000 89100 19500
62,600 146880 42840
125,000 122238 51489

62,600 146880 42840


50,000 102600 29520
66,000 73342.8 30893.4

150,000 223920 78120


55,000 89100 19500
150,000 220320 64260
70,000 48895.2 20595.6
150,000 86616 29484

131,250 1567440 546840


182,438 2494800 546000
112,500 1836000 535500
126,563 1846800 531360
28,875 342266.4 144169.2
219,919 2563833.6 872726.4

52,000 111960 39060


50,000 89100 19500
125,200 205200 59040

149,859 2049300 448500


418,500 6829920 1992060
457,031 6669000 1918800
Page 65 of 113
144,375 1711332 720846
202,088 2355955.2 801964.8

50,000 89100 19500


31,300 73440 21420
100,000 205200 59040
154,000 171133.2 72084.6

144,000 2350080 685440


116,016 1692900 487080
16,500 195580.8 82382.4
77,269 900806.4 306633.6

31,300 73440 21420


75,000 153900 44280
22,000 24447.6 10297.8

144,000 2350080 685440


116,016 1692900 487080
16,500 195580.8 82382.4
77,269 900806.4 306633.6

31,300 73440 21420


75,000 153900 44280
22,000 24447.6 10297.8

144,000 2350080 685440


116,016 1692900 487080
16,500 195580.8 82382.4
77,269 900806.4 306633.6

31,300 73440 21420


75,000 153900 44280
22,000 24447.6 10297.8

6,210,147

190,000 1925000 53400

190,000 1925000 53400

250,000 2150100 67800

250,000 1050100 275000

250,000 7650000 765000

240,000 1849500 168456

121,875 1107751.1004 149546.3986

45,000 270000 24300

33,600 497000 69363

24,000 355000 49545


Page 66 of 113
19,200 2720400 374403.6

28,800 426000 59454

21,600 319500 44590.5

4,800 680100 93600.9

1,668,875

190,000 2164300 207020

250,000 3442500 344250

200,000 725000 125000

200,000 725000 125000

400,000 2560200 168456


190,000 1084937.8882 84228
2,157,400 21269250 1937244

907,500 4817440 584000


1,368,900 10151515.197 1370454.552
1,371,094 12462199.88 1682396.984

190,000 1252200 132200

1,170,000 7215000 631800

186,000 533502 72022.77

19,200 284000 39636

184,800 2733500 381496.5

96,000 1420000 198180

127,200 1881500 262588.5

9,208,094

250,000 2164300 207020

190,000 2164300 207020

Page 67 of 113
225,000 2164300 207020

190,000 2164300 207020

200,000 725000 125000

1,361,250 7226160 876000


2,106,000 15617715.687 2108391.618
990,234 9000477.6908 1215064.488

95,000 626100 66100


95,000 599100 68500
95,000 599100 68500
95,000 322500 55450

1,620,000 9990000 874800

372,000 1067004 144045.54

187,200 2769000 386451

98,400 1455500 203134.5

19,200 284000 39636

103,200 1526500 213043.5

8,292,484

218,500 2164300 207020

190,000 1890000 136000

300,000 3442500 344250

250,000 1890000 136000

200,000 725000 125000

200,000 725000 125000

190,000 1925000 53400

2,098,594 11140330 1350500


2,000,700 14836829.903 2002972.037
2,102,344 19108706.482 2579675.375
Page 68 of 113
380,000 2504400 264400

2,070,000 12765000 1117800

372,000 1067004 144045.54

19,200 284000 39636

144,000 2130000 297270

177,600 2627000 366633

86,400 1278000 178362

52,800 781000 108999

74,400 1100500 153589.5

160,800 2378500 331951.5

11,287,338

218,500 2164300 207020

275,000 3710500 344250

200,000 725000 125000

280,000 725000 125000

2,325,469 12344690 1496500


737,100 5466200.4905 737937.0662
837,891 7615788.8153 1028131.49

190,000 1252200 132200

1,080,000 6660000 583200

186,000 533502 72022.77

19,200 284000 39636

100,800 1491000 208089

50,400 745500 104044.5

120,000 1775000 247725

6,620,359

Page 69 of 113
218,500 2164300 207020

275,000 3710500 344250

200,000 725000 125000

280,000 725000 125000

2,325,469 12344690 1496500


737,100 5466200.4905 737937.0662
837,891 7615788.8153 1028131.49

190,000 1252200 132200

1,080,000 6660000 583200

186,000 533502 72022.77

19,200 284000 39636

100,800 1491000 208089

50,400 745500 104044.5

120,000 1775000 247725

6,620,359

218,500 2164300 207020

275,000 3710500 344250

200,000 725000 125000

280,000 725000 125000

2,325,469 12344690 1496500


737,100 5466200.4905 737937.0662
837,891 7615788.8153 1028131.49

190,000 1252200 132200

1,080,000 6660000 583200

Page 70 of 113
186,000 533502 72022.77

19,200 284000 39636

100,800 1491000 208089

50,400 745500 104044.5

120,000 1775000 247725

6,620,359

61,234,700 932500734.14 141886625.6

Page 71 of 113
RENCANA ANGGARAN BIAYA

PROYEK : RS HERMINA
LOKASI : MALANG
PAKET : PEKERJAAN ELETRIKAL
TANGGAL : OKTOBER 2020

HARGA SATUAN JUMLAH


No. URAIAN PEKERJAAN VOLUME SATUAN
MATERIAL UPAH MATERIAL UPAH

X PEKERJAAN PEMADAM KEBAKARAN


A PEKERJAAN PERALATAN UTAMA PIPA HYDRANT
Pompa Pemadam Kebakaran existing
Pengadaan, pemasangan instalasi fire hydrant,
termasuk dudukan,penggantung , klem, mur,
baut, pengecatan , pengetesan dan perijinan
1 Pekerjaan Hydrant & Sprinkler Luar Bangunan
- BSP Sch. 40 Dia. 100 mm + Isolasi Denso Tape 10.00 m 319,200 78,000 3,192,000.00 780,000.00
- BSP Sch. 40 Dia. 150 mm + Isolasi Denso Tape 80.00 m 558,125 117,000 44,650,000.00 9,360,000.00
- Outdoor Hydrant Box 2.00 bh 5,462,500.00 650,000.00 10,925,000.00 1,300,000.00
- Pillar Hydrant 2.00 bh 2,850,000.00 500,000.00 5,700,000.00 1,000,000.00
- Gate Valve Ø 100 mm 2.00 bh 8,550,000.00 174,000.00 17,100,000.00 348,000.00

Pekerjaan Pemipaan area luar bangunan, sudah termasuk wrapping (anti karat), coating & finish coat.
Tapping pipa Hydrant dan Splinker ke Pipa existing
Pipe BSP Sch-40
- diameter 150 mm 81 m 558,125.00 117,000.00 45,208,125.00 9,477,000.00
- diameter 100 mm 10 m 319,200.00 78,000.00 3,192,000.00 780,000.00
- Fitting pipa ( Elbow, Tee, Tee reducer, dll ) 1 ls 7,260,018.75 1,089,002.81 7,260,018.75 1,089,002.81
- Galian & Urugan Kembali 81 m Rp 96,000.00 28,800.00 7,776,000.00 2,332,800.00

Accessories :
- Bak Kontrol 2 bh 1,000,000.00 250,000.00 2,000,000.00 500,000.00
- Gate Valve Ø 100 mm 2 bh 8,550,000.00 174,000.00 17,100,000.00 348,000.00
Pekerjaan Pemipaan sudah termasuk hanger, support, coating & finish coat.
Tapping ke Pipa existing 1 ls 16,410,314.38 2,461,547.16 16,410,314.38 2,461,547.16

Sub Total A 180,513,458.13 29,776,349.97

B Pemipaan Pemadam kebakaran lantai 1


1 Instalasi pemipaan Hydrant
Pipe BSP Sch-40
1 diameter 65 mm 120 m 178,695.00 56,900 21,443,400.00 6,828,000.00
Accessories Hydrant :
Hydrant Box Type Indoor 1 bh 5,462,500.00 650,000.00 5,462,500.00 650,000.00
ukuran : 125 x 75 x 18 cm, red color
1 pc Hose Nozzle Ø 40 mm
1 pcc Hydrant valve Ø 40 mm
1 pc Hydrant valve Ø 65 mm
1 pc Hose rack 600 mm COMB
1 roll fire hose with Machino Coupling Ø 40 mm x 30 m
Gate Valve 16 Bar
diameter 80 mm 1 bh 6,765,900.00 600,000.00 6,765,900.00 600,000.00
diameter 65 mm 2 bh 4,750,000.00 400,000.00 9,500,000.00 800,000.00
Pressure Gauge 0 -16 bar include ball valve 1 bh 546,250.00 81,937.50 546,250.00 81,937.50
Fire Extinguiser kap.3 kg 3 bh 926,250.00 138,937.50 2,778,750.00 416,812.50
Tapping ke Pipa existing 1 ls 7,125,000.00 7,125,000.00 -

2 Instalasi Pipa Sprinkler


Pipe BSP Sch-40
1 diameter 65 mm 6 m 178,695.00 56,900.00 1,072,170.00 341,400.00
2 diameter 50 mm 16 m 65,550.00 13,110.00 1,048,800.00 209,760.00
3 diameter 40 mm 14 m 48,450.00 9,690.00 678,300.00 135,660.00
4 diameter 32 mm 42 m 46,075.00 9,215.00 1,935,150.00 387,030.00
5 diameter 25 mm 90 m 29,925.00 5,985.00 2,693,250.00 538,650.00
6 Accessories Instalasi Sprinkler :
a. Pressure Gauge include Gate Vale 15 mm (0-16bar) 1 bh 546,250.00 109,250.00 546,250.00 109,250.00
b. Branch Control Valve Sistem diameter 3" 1 bh 12,112,500.00 2,422,500.00 12,112,500.00 2,422,500.00
c. Head Sprinkler Pendant 38 bh 137,750.00 27,550.00 5,234,500.00 1,046,900.00
d. Gate Valve diameter 25 mm 1 bh 356,250.00 71,250.00 356,250.00 71,250.00
Tapping ke Pipa existing 1 ls 7,929,897.00 792,989.70 7,929,897.00 792,989.70

Sub Total B 87,228,867.00 15,432,139.70

C Pemipaan Pemadam kebakaran lantai 2


1 Instalasi pemipaan Hydrant
Pipe BSP Sch-40
1 diameter 65 mm 120 m 178,695.00 56,900.00 21,443,400.00 6,828,000.00
Accessories Hydrant :
Hydrant Box Type Indoor 1 bh 5,462,500.00 650,000.00 5,462,500.00 650,000.00
ukuran : 125 x 75 x 18 cm, red color
1 pc Hose Nozzle Ø 40 mm
1 pcc Hydrant valve Ø 40 mm
1 pc Hydrant valve Ø 65 mm
1 pc Hose rack 600 mm COMB
1 roll fire hose with Machino Coupling Ø 40 mm x 30 m
Gate Valve 16 Bar
diameter 80 mm 1 bh 6,765,900.00 600,000.00 6,765,900.00 600,000.00
diameter 65 mm 2 bh 4,750,000.00 400,000.00 9,500,000.00 800,000.00
Pressure Gauge 0 -16 bar include ball valve 1 bh 546,250.00 81,937.50 546,250.00 81,937.50
Fire Extinguiser kap.3 kg 3 bh 926,250.00 138,937.50 2,778,750.00 416,812.50
Tapping ke Pipa existing 1 ls 7,125,000.00 - 7,125,000.00 -

2 Instalasi Pipa Sprinkler


Pipe BSP Sch-40
1 diameter 65 mm 6 m 178,695.00 56,900.00 1,072,170.00 341,400.00
2 diameter 50 mm 16 m 65,550.00 13,110.00 1,048,800.00 209,760.00
3 diameter 40 mm 14 m 48,450.00 9,690.00 678,300.00 135,660.00
4 diameter 32 mm 42 m 46,075.00 9,215.00 1,935,150.00 387,030.00
5 diameter 25 mm 90 m 29,925.00 5,985.00 2,693,250.00 538,650.00
6 Accessories Instalasi Sprinkler :
a. Pressure Gauge include Gate Vale 15 mm (0-16bar) 1 bh 546,250.00 109,250.00 546,250.00 109,250.00
b. Branch Control Valve Sistem diameter 3" 1 bh 12,112,500.00 2,422,500.00 12,112,500.00 2,422,500.00
c. Head Sprinkler Pendant 38 bh 137,750.00 27,550.00 5,234,500.00 1,046,900.00
d. Gate Valve diameter 25 mm 1 bh 356,250.00 71,250.00 356,250.00 71,250.00
Tapping ke Pipa existing 1 ls 7,929,897.00 792,989.70 7,929,897.00 792,989.70

Sub Total C 87,228,867.00 15,432,139.70

D Pemipaan Pemadam kebakaran lantai 3


1 Instalasi pemipaan Hydrant
Pipe BSP Sch-40
1 diameter 65 mm 20 m 178,695.00 56,900.00 3,573,900.00 1,138,000.00
Accessories Hydrant :
Hydrant Box Type Indoor 1 bh 5,462,500.00 650,000.00 5,462,500.00 650,000.00
ukuran : 125 x 75 x 18 cm, red color
1 pc Hose Nozzle Ø 40 mm
1 pcc Hydrant valve Ø 40 mm
1 pc Hydrant valve Ø 65 mm
1 pc Hose rack 600 mm COMB
1 roll fire hose with Machino Coupling Ø 40 mm x 30 m
Fire Extinguiser kap.3 kg 3 bh 926,250.00 138,937.50 2,778,750.00 416,812.50
Tapping ke Pipa existing 1 ls 1,181,515.00 236,303.00 1,181,515.00 236,303.00

2 Instalasi Pipa Sprinkler


Pipe BSP Sch-40
1 diameter 50 mm 10 m 65,550.00 13,110.00 655,500.00 131,100.00
2 diameter 40 mm 14 m 48,450.00 9,690.00 678,300.00 135,660.00
3 diameter 32 mm 15 m 46,075.00 9,215.00 691,125.00 138,225.00
4 diameter 25 mm 90 m 29,925.00 5,985.00 2,693,250.00 538,650.00
5 Accessories Instalasi Sprinkler :
a. Head Sprinkler Pendant 46 bh 137,750.00 27,550.00 6,336,500.00 1,267,300.00
Tapping ke Pipa existing 1 ls 2,405,134.00 360,770.10 2,405,134.00 360,770.10

Sub Total D 26,456,474.00 5,012,820.60

E Pemipaan Pemadam kebakaran lantai 4


1 Instalasi pemipaan Hydrant
Pipe BSP Sch-40
1 diameter 65 mm 20 m 178,695.00 56,900.00 3,573,900.00 1,138,000.00
Accessories Hydrant :
Hydrant Box Type Indoor 1 bh 5,462,500.00 650,000.00 5,462,500.00 650,000.00
ukuran : 125 x 75 x 18 cm, red color
1 pc Hose Nozzle Ø 40 mm
1 pcc Hydrant valve Ø 40 mm
1 pc Hydrant valve Ø 65 mm
1 pc Hose rack 600 mm COMB
1 roll fire hose with Machino Coupling Ø 40 mm x 30 m
Fire Extinguiser kap.3 kg 3 bh 926,250.00 138,937.50 2,778,750.00 416,812.50
Tapping ke Pipa existing 1 ls 1,181,515.00 236,303.00 1,181,515.00 236,303.00

2 Instalasi Pipa Sprinkler


Pipe BSP Sch-40
1 diameter 50 mm 10 m 65,550.00 13,110.00 655,500.00 131,100.00
2 diameter 40 mm 14 m 48,450.00 9,690.00 678,300.00 135,660.00
3 diameter 32 mm 15 m 46,075.00 9,215.00 691,125.00 138,225.00
4 diameter 25 mm 80 m 29,925.00 5,985.00 2,394,000.00 478,800.00
5 Accessories Instalasi Sprinkler :
a. Head Sprinkler Pendant 37 bh 137,750.00 27,550.00 5,096,750.00 1,019,350.00
Tapping ke Pipa existing 1 ls 2,251,234.00 337,685.10 2,251,234.00 337,685.10

Sub Total E 24,763,574.00 4,681,935.60


F Pemipaan Pemadam kebakaran lantai 5
1 Instalasi pemipaan Hydrant
Pipe BSP Sch-40
1 diameter 65 mm 20 m 178,695.00 56,900.00 3,573,900.00 1,138,000.00
Accessories Hydrant :
Hydrant Box Type Indoor 1 bh 5,462,500.00 650,000.00 5,462,500.00 650,000.00
ukuran : 125 x 75 x 18 cm, red color
1 pc Hose Nozzle Ø 40 mm
1 pcc Hydrant valve Ø 40 mm
1 pc Hydrant valve Ø 65 mm
1 pc Hose rack 600 mm COMB
1 roll fire hose with Machino Coupling Ø 40 mm x 30 m
Fire Extinguiser kap.3 kg 3 bh 926,250.00 138,937.50 2,778,750.00 416,812.50
Tapping ke Pipa existing 1 ls 1,181,515.00 177,227.25 1,181,515.00 177,227.25

2 Instalasi Pipa Sprinkler


Pipe BSP Sch-40
1 diameter 50 mm 10 m 65,550.00 13,110.00 655,500.00 131,100.00
2 diameter 40 mm 14 m 48,450.00 9,690.00 678,300.00 135,660.00
3 diameter 32 mm 15 m 46,075.00 9,215.00 691,125.00 138,225.00
4 diameter 25 mm 60 m 29,925.00 5,985.00 1,795,500.00 359,100.00
5 Accessories Instalasi Sprinkler :
a. Head Sprinkler Pendant 44 bh 137,750.00 27,550.00 6,061,000.00 1,212,200.00
Tapping ke Pipa existing 1 ls 2,251,234.00 337,685.10 2,251,234.00 337,685.10

Sub Total F 25,129,324.00 4,696,009.85

G Pemipaan Pemadam kebakaran lantai 6


1 Instalasi pemipaan Hydrant
Pipe BSP Sch-40
1 diameter 65 mm 20 m 178,695.00 56,900.00 3,573,900.00 1,138,000.00
Accessories Hydrant :
Hydrant Box Type Indoor 1 bh 5,462,500.00 650,000.00 5,462,500.00 650,000.00
ukuran : 125 x 75 x 18 cm, red color
1 pc Hose Nozzle Ø 40 mm
1 pcc Hydrant valve Ø 40 mm
1 pc Hydrant valve Ø 65 mm
1 pc Hose rack 600 mm COMB
1 roll fire hose with Machino Coupling Ø 40 mm x 30 m
Fire Extinguiser kap.3 kg 3 bh 926,250.00 138,937.50 2,778,750.00 416,812.50
Tapping ke Pipa existing 1 ls 1,181,515.00 177,227.25 1,181,515.00 177,227.25

2 Instalasi Pipa Sprinkler


Pipe BSP Sch-40
1 diameter 50 mm 10 m 65,550.00 13,110.00 655,500.00 131,100.00
2 diameter 40 mm 14 m 48,450.00 9,690.00 678,300.00 135,660.00
3 diameter 32 mm 15 m 46,075.00 9,215.00 691,125.00 138,225.00
4 diameter 25 mm 60 m 29,925.00 5,985.00 1,795,500.00 359,100.00
5 Accessories Instalasi Sprinkler :
a. Head Sprinkler Pendant 44 bh 137,750.00 27,550.00 6,061,000.00 1,212,200.00
Tapping ke Pipa existing 1 ls 2,287,809.00 343,171.35 2,287,809.00 343,171.35

Sub Total G 25,165,899.00 4,701,496.10

H TEST COMMISIONING SELURUH SYSTEM 1 ls 7,125,000.00 - 7,125,000.00

Test Commissioning, Dok Manual Operation, Training & Drawing


1
2 Sertifikasi layak operasi & Sertifikasi layak fungsi oleh dinas/ instansi ya 1 35,000,000.00 35,000,000.00 -

Sub Total H 35,000,000.00 7,125,000.00

Total PEKERJAAN PEMADAM KEBAKARAN 491,486,463.13 86,857,891.52

Total PEKERJAAN PEMADAM KEBAKARAN 578,344,354.64


RENCANA ANGGARAN BIAYA
PROYEK : RS HERMINA
LOKASI : MALANG
PAKET : PEKERJAAN ELETRIKAL
TANGGAL : OKTOBER 2020

HARGA SATUAN TOTAL HARGA


NO URAIAN PEKERJAAN SAT. VOL. Material Upah Material
(Rp.) (Rp.) (Rp.)

XII PEKERJAAN AIR CONDITIONING LANTAI DUA

PERALATAN UTAMA AIR CONDITIONING, INSTALASI KABEL POWER & KONTROL,


DAN PEMIPAAN REFRIGERANT

1 RUANG OK 1
1.1 Penyediaan dan pemasangan Chiller
lengkap dengan accessories

a AHU
Kode, GB : AHU-OK1.1 Unit 1 131,750,000 22,397,500 131,750,000
Merk : Daikin
Kapasitas : 90.000 Btu/h
Air Flow : 2850 CFM
Static Pressure : 4"
Dimensi : 3600 x 1000 x 1000 mm
Include Heater : - Heater
- Panel Kontrol
- Thermostart
- Magnic Hellix
- Humadity Meter
b Hefa Filter (Pre & Medium)
Size : 1200x 600 mm unit 2 23,757,500 2,337,500 47,515,000
c AIR COOLED CHILLER
Kode, GB : Chiller-1 & Chiller-2 Unit 2 37,740,000 9,623,700 75,480,000
Kapasitas : 7,3 TR
Fungsi : Sirkulasi Air Dingin
Leaving Chilled Water Temp : 44.6 F
Entering Chilled Water Temp : 53.6 F
Refrigerant : H407C
Karakteristik : 380-415V/3Phase/50Hz
Total Input Daya : Kw
Berat Kerja : 3.000 Kg
Panjang : 1.380 mm
Lebar : 920 mm
Tinggi : 1.400 mm
Jumlah : 2 Unit
d POMPA CHILLER
Kode, GB : CHWP.1,2 & 3. (1 Spare) Unit 3 18,360,000 2,340,900 55,080,000
Model : Centrifugal End Suction
Fungsi : Pengolah Air Dingin
Aliran Air : 250 GPM
Total Head : 15 Meter
Efesiensi Minimal : 80 Persen
Daya : 1 Kw
Putaran : 1.500 RPM
Karakteristik : 380-415V/3Phase/50Hz
Berat Kerja : 100 Kg
Suction : 50 mm
Discharge : 50 mm
Jumlah : 3 Unit
e EXPANTION TANK
Kode, GB : ET Set 1 7,140,000 1,820,700 7,140,000
Kapasitas : 200 Liter
Bahan : Fiber Glass
Jumlah : 1 Unit
('Lengkap Menara Bahan UNP Tinggi 2,5 Meter, Pondasi Beton, Valve-Valve dan aksesoris)
f EXHAUST FAN
Kode Gambar : EF-OK.1-1 unit 1 3,500,000 190,000 3,500,000
Kapasitas : 500 CFM
Static Pressure : 1" wg
g Accessories Air Cooled Chiller
Pressure Gauge + Valve bh 4 595,000 127,500 2,380,000
Thermometer bh 4 850,000 108,375 3,400,000
Two Way Motorized Valve bh 2 34,000,000 4,335,000 68,000,000
Gate Valve : Dia 80 mm (3") bh 4 6,765,900 600,000 27,063,600
Gate Valve : Dia 100 mm (4") bh 2 8,550,000 726,750 17,100,000
Flexible Conection : Dia 80 mm (3") bh 4 759,688 96,860 3,038,750
"Y" Strainer : Dia 80 mm (3") bh 4 2,231,250 284,484 8,925,000
Pipa Header : Dia 150 mm (6") m' 5 1,020,000 86,700 5,100,000
Pipa Header : Dia 100 mm (4") m' 3 850,000 72,250 2,550,000
AAV bh 1 2,847,500 363,056 2,847,500
MAV bh 1 690,625 88,055 690,625
Isolasi Dan Jacketing : ls 1 1,275,000 108,375 1,275,000
h Accessories Pompa-Pompa Chiller
Pressure Gauge + Valve bh 3 2,339,820 701,946 7,019,459
Thermometer bh 4 297,500 108,375 1,190,000
Flexible Conection : Dia 80 mm (3") bh 3 759,688 96,860 2,279,063
Gate Valve : Dia 80 mm (3") bh 3 6,765,900 600,000 20,297,700
"Y" Strainer : Dia 80 mm (3") bh 3 5,323,508 536,556 15,970,523
Pipa Header : Dia 150 mm (6") m' 5 234,240 73,411 1,171,198
Isolasi Dan Jacketing ls 1 1,275,000 108,375 1,275,000
i Pekerjaan Pipa dan kelengkapannya, berdasarkan spesifikasi
dan gambar.
Pipa Chiller CHWS dia 80 mm (3") dengan isolasi Hermaflex Stainless Steel m' 43 106,250 10,625 4,568,750
Pipa Chiller CHWR dia 100 mm (4") dengan isolasi Hermaflex Stainless Steel m' 11 165,750 16,575 1,823,250
Pipa ET dia. 80 mm (3") m' 21 212,500 21,250 4,462,500
1.2 Pipa Drain
a PVC class AW c/w isolasi, support,
hanger & fitting
pipa : dia. 1,5" m' 2 30,000 6,000 60,000
1.3 Pekerjaan Ducting
a Pre Insulated Alumunium Duct (PU)
- Dimensi : 500 x 450 ( Supply ) m2 19 552,500 55,250 10,497,500
: 350 x 350 ( Supply ) m2 4 335,750 27,625 1,343,000
550 x 400 ( Return ) m2 15 382,500 27,625 5,737,500
450 x 400 ( Return ) m2 4 361,250 27,625 1,445,000
350 x 350 ( Return ) m2 3 348,500 27,625 1,045,500
300 x 350 ( Return ) m2 10 335,750 21,420 3,357,500

1.4 Pekerjaan Kabel Control :


Kabel Control Dari AHU ke :
- Panel On-Off d/kabel m' 25 14,144 4,250 353,600
NYAF 2x1,5 mm2 dlm Conduit PVC 3/4"
- Thermostat d/kabel m' 24 40,375 9,450 969,000
NYMHY 6x1x1,5 mm2 dlm Conduit PVC 3/4"

1.5 Volume Dumper


Dimensi : 350 x 300 mm bh 2 335,750 21,420 671,500
1.6 Grill
Dimensi : 300 x 300 mm bh 1 369,750 36,975 369,750
1.7 Louvre Grill
Dimensi : 450 x 350 mm bh 1 369,750 38,250 369,750
1.8 Pengangkatan Unit Chiller & Unit AHU Ke Lantai Atap Lot 1 8,500,000 8,500,000
1.9 Material Bantu Lot 1 14,875,000 14,875,000
2 RUANG OK 2
Penyediaan dan pemasangan
Chiller lengkap dengan accessories
a AHU
Kode, GB : AHU-OK.2 Unit 1 131,750,000 22,397,500 131,750,000
Merk : Daikin
Kapasitas : 90.000 Btu/h
Air Flow : 2850 CFM
Static Pressure : 4"
Dimensi : 3600 x 1000 x 1000 mm
Include Heater : - Heater
- Panel Kontrol
- Thermostart
- Magnic Hellix
- Humadity Meter
b EXHAUST FAN
Kode Gambar : EF-OK.2-2 unit 1 5,995,000 275,000 5,995,000
Kapasitas : 1.500 CFM
Static Pressure : 1" wg
Kode Gambar : EF-OK.2-3 unit 1 1,560,000 200,000 1,560,000
Kapasitas : 200 CFM
Static Pressure : 0.2" wg
c Hefa Filter (Pre & Medium)
Size : 1200x 600 mm unit 2 23,757,500 2,337,500 47,515,000
1.3 Pipa Drain
a PVC class AW c/w isolasi, support,
hanger & fitting
pipa : dia. 1,5" m' 2 30,000 6,000 60,000
1.4 Pekerjaan Ducting
a Pre Insulated Alumunium Duct (PU)
- Dimensi : 500 x 450 ( Supply ) m2 20 552,500 55,250 11,050,000
: 350 x 350 ( Supply ) m2 4 335,750 27,625 1,343,000
500 x 400 ( Return ) m2 15 382,500 27,625 5,737,500
450 x 400 ( Return ) m2 6 361,250 27,625 2,167,500
350 x 350 ( Return ) m2 3 348,500 27,625 1,045,500
350 x 300 ( Return ) m2 9 335,750 21,420 3,021,750
300 x 300 ( Return ) m2 5 335,750 21,420 1,678,750

1.5 Pekerjaan Kabel Control :


Kabel Control Dari AHU ke :
- Panel On-Off d/kabel m' 21 14,144 4,250 297,024
NYAF 2x1,5 mm2 dlm Conduit PVC 3/4"
- Thermostat d/kabel m' 20 40,375 9,450 807,500
NYMHY 6x1x1,5 mm2 dlm Conduit PVC 3/4"

1.6 Volume Dumper


Dimensi : 350 x 300 mm bh 3 335,750 21,420 1,007,250
1.7 Grill
Dimensi : 450 x 300 mm bh 3 369,750 36,975 1,109,250
1.8 Louvre Grill
Dimensi : 450 x 350 mm bh 1 369,750 38,250 369,750
1.9 Pengangkatan Unit AHU Ke Dak Lantai 4 Lot 1 8,500,000 8,500,000
2.0 Material Bantu Lot 1 14,875,000 14,875,000

Total Pekerjaan VAC Ruang OK 812,377,291

924,408,049
TOTAL HARGA
Upah
(Rp.)

22,397,500

4,675,000

19,247,400

7,022,700

1,820,700

190,000

510,000
433,500
8,670,000
2,400,000
1,453,500
387,441
1,137,938
433,500
216,750
363,056
88,055
108,375

2,105,838
433,500
290,580
1,800,000
1,609,667
367,054
108,375

456,875
182,325
446,250

12,000

1,049,750
110,500
414,375
110,500
82,875
214,200

106,250

226,800

42,840

36,975

38,250
-
-

22,397,500

275,000

200,000

4,675,000

12,000
1,105,000
110,500
414,375
165,750
82,875
192,780
107,100

89,250

189,000

64,260

110,925

38,250
-
-

112,030,758
RENCANA ANGGARAN BIAYA

PROYEK : RS HERMINA
LOKASI : MALANG
PAKET : PEKERJAAN ELETRIKAL
TANGGAL : OKTOBER 2020

HARGA SATUAN TOTAL HARGA


NO URAIAN PEKERJAAN SAT. VOL.
(Rp.) (Rp.)

XIII PEKERJAAN GENSET


A. Peralatan Utama Genset

Pengadaan dan pemasangan Peralatan Utama Genset, lengkap terpasang dengan alat
bantu dan accessories lain yang diperlukan sesuai dengan gambar perencanaan dan
spesifikasi teknis.

Diesel Generator Set Silent Type Kapasitas 400 kVA (Silent Type), 380/220 V / 50
1 unit 1 650,000,000 650,000,000
Hz / 1500 RPM, Standby Rating. c/w Residential Silencer, Spring Vibration.

2 Panel Kontrol Genset (PKG) unit 1


3 Tangki Bahan Bakar Mingguan Kapasitas 15.000 liter unit -
4 Tangki Bahan Bakar Harian Kapasitas 5.000 liter unit
5 Pompa Electric unit -
6 Pompa Manual unit -
7 Panel Pompa Electric termasuk Wiring & Sistem Control unit -
8 Exhaust Attenuator unit 1 3,000,000 3,000,000
9 Intake Attenuator unit 1 3,000,000 3,000,000

B. Peralatan Instalasi Genset

Pengadaan dan pemasangan instalasi Genset, lengkap terpasang dengan alat bantu
dan accessories lain yang diperlukan sesuai dengan gambar perencanaan dan
spesifikasi teknis.

Instalasi Pemipaan bahan bakar lengkap dengan Gate Valve, Check Valve, Float
1 lot
Valve dan Accessories -
2 Instalasi Pipa Cerobong Asap/Knalpot ke Area Luar Bangunan lot 1 12,500,000 12,500,000
3 Pengadaan Solar 2,500 ltr Pada Saat Serah Terima lot -
4 Grounding body genset titik 1 2,500,000 2,500,000

Total Pekerjaan Genset 671,000,000


PROYEK : RS HERMINA
LOKASI : CILEGON
PAKET : PEKERJAAN LIFT SERVICE
TANGGAL : OKTOBER 2020

HARGA SATUAN TOTAL HARGA


NO URAIAN PEKERJAAN SAT. VOL.
(Rp) SATUAN (Rp)

XIV PEKERJAAN LIFT

A PEKERJAAN DAN PENGADAAN UNIT LIFT SERVICE Unit 1 685,000,000 685,000,000

1 Nama Lift : L - 3
2 Operasi / Sistem Kontrol : Simplex
3 Berat : 1600 Kg
4 Kecepatan : 1.5 Sec
5 Tipe Lift : Lift Service
7 Jumlah Stop : 4 Opening / 4 Stop
8 Overhead : 4.500 mm
9 Tinggi R.Mesin Lift :
10 Pit Lift : 1.500 mm
11 Ukuran Hoistwy (L x D) : 2.400 x 3.000 mm
12 Travel : 17.200 mm
13 Mesin Lift : R. Mesin Diatas Hoistway
14 Finishing Dinding : Painted Steel
15 Finishing Lantai : Vinyl Tile
16 Finishing Pintu : Panel With Glass Window
17 Pelindung Dinding : Rubber Pad (3 Sisi)

B AUTOMATIC RESCUE DEVICE (ARD) Unit 1 - -

C INSTALASI CCTV + CCTV Unit 1 3,318,400 3,318,400

D PENGADAAN PANEL LIFT (Include Kabel Power) Unit 1 6,500,000 6,500,000

E MOBILISASI & TRANSPORTASI/BIAYA KIRIM Lot 1 - -

F PEMASANGAN/INSTALASI LIFT DAN PERIZINAN DEPNAKER Lot 1 - -

G SYSTEM PENTANAHAN Lot 1 5,000,000 5,000,000

H TESTING DAN COMMISSIONING Lot 1 1,500,000 1,500,000

SUB TOTAL XIV 701,318,400

Page 84 of 113
PROYEK : RUMAH SAKIT HERMINA CILEGON
PAKET : PEKERJAAN LIFT PENUMPANG
TANGGAL : OKTOBER 2020

HARGA SATUAN TOTAL HARGA


NO URAIAN PEKERJAAN SATUAN VOLUME
(Rp) SATUAN (Rp)

XV PEKERJAAN LIFT

A PEKERJAAN DAN PENGADAAN UNIT LIFT PENUMPANG Unit 1.00 Rp 685,000,000 Rp 685,000,000

1 Nama Lift : LP - 1 & LP - 2


2 Operasi / Sistem Kontrol : Duplex
3 Berat : 1600 Kg
4 Kecepatan : 1.5 m/sec
5 Tipe Lift : Lift Penumpang
6 Jumlah Stop : 4 Opening / 4 Stop
7 Overhead : 4.500 mm
8 Tinggi R.Mesin Lift : mm
9 Pit Lift : 1.500 mm
10 Ukuran Hoistwy (L x D) : 2.400 x 3.000 mm
11 Travel : 15.900 mm
12 Mesin Lift : R. Mesin Diatas Hoistway
13 Finishing Dinding : Painted Steel
14 Finishing Lantai : Vinyl Tile
15 Finishing Pintu : Panel With Glass Window
16 Pelindung Dinding : Rubber Pad (3 Sisi)

B AUTOMATIC RESCUE DEVICE (ARD) Unit 1.00 Rp - Rp -

C INSTALASI CCTV + CCTV Unit 1.00 Rp 3,318,400 Rp 3,318,400

D PENGADAAN PANEL LIFT (Include Kabel Power) Unit 1.00 Rp 6,500,000 Rp 6,500,000

E MOBILISASI & TRANSPORTASI/BIAYA KIRIM Lot 1.00 Rp - Rp -

F PEMASANGAN/INSTALASI LIFT DAN PERIZINAN DEPNAKER Lot 1.00 Rp - Rp -

G SYSTEM PENTANAHAN Lot 1.00 Rp 5,000,000 Rp 5,000,000

H TESTING DAN COMMISSIONING Lot 1.00 Rp 1,500,000 Rp 1,500,000

SUB TOTAL XV Rp 701,318,400

Page 85 of 113
1 2 3 6

No. Ruang yang dilayani Kode Unit Kapasitas Pendinginan

KODE Indoor (Btu/h) / Unit


LANTAI 1
L1 - ZONA I

1 Kasir 1 L1-Z1-01 IU-AC-L6/L1-Z1-01 19100

2 Poli TB L1-Z1-02 IU-AC-L6/L1-Z1-02 7500

3 R. Tunggu Jenazah L1-Z1-03 IU-AC-L6/L1-Z1-03 7500

4 Pemulasaran jenazah L1-Z1-04 IU-AC-L6/L1-Z1-04 9600

5 CT Scan 1 L1-Z1-06 IU-AC-L6/L1-Z1-06 12300

6 CT Scan 2 L1-Z1-07 IU-AC-L6/L1-Z1-07 12300

7 R. Control 1 L1-Z1-08 IU-AC-L6/L1-Z1-08 12300

8 R. Control 2 L1-Z1-09 IU-AC-L6/L1-Z1-09 12300

9 USG L1-Z1-10 IU-AC-L6/L1-Z1-10 7500

10 Radiologi L1-Z1-11 IU-AC-L6/L1-Z1-11 19100

11 R. Dokter L1-Z1-12 IU-AC-L6/L1-Z1-12 7500

12 Poli Reguler 1 L1-Z1-13 IU-AC-L6/L1-Z1-13 24200

13 Poli Reguler 2 L1-Z1-14 IU-AC-L6/L1-Z1-14 24201

14 Poli Reguler 3 L1-Z1-15 IU-AC-L6/L1-Z1-15 24202

15 Isolasi L1-Z1-16 IU-AC-L6/L1-Z1-16 7500

16 Poli Umum L1-Z1-17 IU-AC-L6/L1-Z1-17 7500

17 Ponek L1-Z1-18 IU-AC-L6/L1-Z1-18 7500


18 R. Tunggu IGD, CT Scan 1 L1-Z1-19 IU-AC-L6/L1-Z1-19 17000

19 R. Tunggu IGD, CT Scan 2 L1-Z1-20 IU-AC-L6/L1-Z1-20 17000

20 R. Tunggu IGD, CT Scan 3 L1-Z1-21 IU-AC-L6/L1-Z1-21 17000

21 R. Tunggu IGD, CT Scan 4 L1-Z1-22 IU-AC-L6/L1-Z1-22 17000

22 R. Tunggu IGD, CT Scan 5 L1-Z1-23 IU-AC-L6/L1-Z1-23 17000

23 R. Tunggu IGD, CT Scan 6 L1-Z1-24 IU-AC-L6/L1-Z1-24 17000

24 R. Tunggu IGD, CT Scan 7 L1-Z1-25 IU-AC-L6/L1-Z1-25 17000

25 Kasir 2 L1-Z1-26 IU-AC-L6/L1-Z1-26 9600

26 Operator L1-Z1-28 IU-AC-L6/L1-Z1-28 7500

L1 - ZONA 2

1 Integrasi L1-Z2-29 IU-AC-L1/L1-Z1-29 12300

2 Fisio KTK L1-Z2-30 IU-AC-L1/L1-Z1-30 17000

3 Terapi Wicara 1 L1-Z2-31 IU-AC-L1/L1-Z1-31 12300

4 Poli Saraf L1-Z2-32 IU-AC-L1/L1-Z1-32 7500

5 Poli Kulit L1-Z2-33 IU-AC-L1/L1-Z1-33 7500

6 Poli Bedah L1-Z2-34 IU-AC-L1/L1-Z1-34 7500

7 Poli Penyakit dala L1-Z2-35 IU-AC-L1/L1-Z1-35 7500

8 Poli Jantung L1-Z2-36 IU-AC-L1/L1-Z1-36 9600

9 Poli THT L1-Z2-37 IU-AC-L1/L1-Z1-37 7500

10 Poli Gigi 1 L1-Z2-38 IU-AC-L1/L1-Z1-38 12300


11 Depo Farmasi L1-Z2-39 IU-AC-L1/L1-Z1-39 7500

12 Fisioterapi 1 L1-Z2-40 IU-AC-L1/L1-Z1-40 17000

13 Fisioterapi 2 L1-Z2-41 IU-AC-L1/L1-Z1-41 17001

14 R. Gym L1-Z2-42 IU-AC-L1/L1-Z1-42 17000

15 R. Snozelen L1-Z2-43 IU-AC-L1/L1-Z1-43 7500

16 Terapi Wicara 2 L1-Z2-44 IU-AC-L1/L1-Z1-44 9600

17 Okupasi terapi L1-Z2-45 IU-AC-L1/L1-Z1-45 12300

18 Poli Gigi 2 L1-Z2-46 IU-AC-L1/L1-Z1-46 7500

19 Poli Mata L1-Z2-47 IU-AC-L1/L1-Z1-47 9600

20 Koridoor 1 L1-Z2-48 IU-AC-L1/L1-Z1-48 19100

21 Koridoor 2 L1-Z2-49 IU-AC-L1/L1-Z1-49 19100

22 Koridoor 3 L1-Z2-50 IU-AC-L1/L1-Z1-50 19100

23 Koridoor 4 L1-Z2-51 IU-AC-L1/L1-Z1-51 19100

24 Koridoor 5 L1-Z2-52 IU-AC-L1/L1-Z1-52 19100

25 Koridoor 6 L1-Z2-53 IU-AC-L1/L1-Z1-53 19100

26 Koridoor 7 L1-Z2-54 IU-AC-L1/L1-Z1-54 19100

LANTAI 2

Kode Unit Kapasitas Pendinginan


No. Ruang yang dilayani
KODE Indoor (Btu/h) / Unit
ZONA 1 L2

1 Mushalla L2-Z1-01 IU-AC-L2/L2-Z1-01 19100


2 Farmasi L2-Z1-02 IU-AC-L2/L2-Z1-02 24200

3 Sampling & Laboratorium L2-Z1-03 IU-AC-L2/L2-Z1-03 19100

4 Kasir L2-Z1-04 IU-AC-L2/L2-Z1-04 7500

5 Gd. Farmasi L2-Z1-05 IU-AC-L2/L2-Z1-05 9600

6 Poli Obsgyn L2-Z1-06 IU-AC-L2/L2-Z1-06 7500

7 PKRS L2-Z1-07 IU-AC-L2/L2-Z1-07 7500

8 Poli Anak L2-1 L2-Z1-08 IU-AC-L2/L2-Z1-08 9600

9 R. Menyusui L2-Z1-09 IU-AC-L2/L2-Z1-09 7500

10 Poli Anak L2-2 L2-Z1-10 IU-AC-L2/L2-Z1-10 7500

11 Laktasi L2-Z1-11 IU-AC-L2/L2-Z1-11 7500

12 Poli Anak L2-3 L2-Z1-12 IU-AC-L2/L2-Z1-12 7500

13 Poli Anak L2-4 L2-Z1-13 IU-AC-L2/L2-Z1-13 7500

14 Poli Anak L2-5 L2-Z1-14 IU-AC-L2/L2-Z1-14 7500

15 Poli Obsgyn L2-Z1-15 IU-AC-L2/L2-Z1-15 9600

16 Admin RWI L2-Z1-16 IU-AC-L2/L2-Z1-16 7500

17 R. Tunggu, Koridoor L2-1 L2-Z1-17 IU-AC-L2/L2-Z1-17 20500

18 R. Tunggu, Koridoor L2-2 L2-Z1-18 IU-AC-L2/L2-Z1-18 20500

19 R. Tunggu, Koridoor L2-3 L2-Z1-19 IU-AC-L2/L2-Z1-19 20500

20 R. Tunggu, Koridoor L2-4 L2-Z1-20 IU-AC-L2/L2-Z1-20 20500

21 R. Tunggu, Koridoor L2-5 L2-Z1-21 IU-AC-L2/L2-Z1-21 20500


22 R. Tunggu, Koridoor L2-6 L2-Z1-22 IU-AC-L2/L2-Z1-22 20500

23 R. Tunggu, Koridoor L2-7 L2-Z1-23 IU-AC-L2/L2-Z1-23 20500

24 R. Tunggu, Koridoor L2-8 L2-Z1-24 IU-AC-L2/L2-Z1-24 20500

25 R. Tunggu, Koridoor L2-9 L2-Z1-25 IU-AC-L2/L2-Z1-25 20500

26 R. Tunggu, Koridoor L2-10 L2-Z1-26 IU-AC-L2/L2-Z1-26 20500

27 R. Tunggu, Koridoor L2-11 L2-Z1-27 IU-AC-L2/L2-Z1-27 20500

ZONA 2 L2

1 VIP IBU L2-1 L2-Z2-28 IU-AC-L2/L2-Z2-28 12300

2 VIP IBU L2-2 L2-Z2-29 IU-AC-L2/L2-Z2-29 12300

3 VIP IBU L2-3 L2-Z2-30 IU-AC-L2/L2-Z2-30 12300

4 IBU Kelas 1 - 1 L2-Z2-31 IU-AC-L2/L2-Z2-31 7500

5 IBU Kelas 1 - 2 L2-Z2-32 IU-AC-L2/L2-Z2-32 7500

6 IBU Kelas 1 - 3 L2-Z2-33 IU-AC-L2/L2-Z2-33 7500

7 IBU Kelas 1 - 4 L2-Z2-34 IU-AC-L2/L2-Z2-34 7500

8 IBU Kelas 1 - 5 L2-Z2-35 IU-AC-L2/L2-Z2-35 7500

9 IBU Kelas 1 - 6 L2-Z2-36 IU-AC-L2/L2-Z2-36 7500

10 IBU Kelas 3 - 1 L2-Z2-37 IU-AC-L2/L2-Z2-37 19100

11 IBU Kelas 2 - 1 L2-Z2-38 IU-AC-L2/L2-Z2-38 19100

12 Isolasi L2-1 L2-Z2-39 IU-AC-L2/L2-Z2-39 7500

13 Isolasi L2-2 L2-Z2-40 IU-AC-L2/L2-Z2-40 7500


14 IBU Kelas 3 - 2 L2-Z2-41 IU-AC-L2/L2-Z2-41 9600

15 IBU Kelas 3 - 3 L2-Z2-42 IU-AC-L2/L2-Z2-42 9600

16 IBU Kelas 2 - 2 L2-Z2-43 IU-AC-L2/L2-Z2-43 9600

17 IBU Kelas 2 - 3 L2-Z2-44 IU-AC-L2/L2-Z2-44 9600

18 Korridoor L2-1 L2-Z2-45 IU-AC-L2/L2-Z2-45 24200

19 Korridoor L2-2 L2-Z2-46 IU-AC-L2/L2-Z2-46 24200

20 Korridoor L2-3 L2-Z2-47 IU-AC-L2/L2-Z2-47 24200

21 Korridoor L2-4 L2-Z2-48 IU-AC-L2/L2-Z2-48 24200

22 Korridoor L2-5 L2-Z2-49 IU-AC-L2/L2-Z2-49 24200

LANTAI 3
L3 - ZONA 1
1 R. Dokter L3-Z1-01 IU-AC-L3/L3-Z1-01
2 R. Ganti Perawat L3-Z1-02 IU-AC-L3/L3-Z1-02
3 Pre Operasi L3-Z1-1 L3-Z1-03 IU-AC-L3/L3-Z1-03
4 Pre Operasi L3-Z1-2 L3-Z1-04 IU-AC-L3/L3-Z1-04
5 Depo Farmasi L3-Z1-05 IU-AC-L3/L3-Z1-05
6 Autoclave L3-Z1-06 IU-AC-L3/L3-Z1-06
7 Packing L3-Z1-07 IU-AC-L3/L3-Z1-07
8 R. Transfer 1 L3-Z1-08 IU-AC-L3/L3-Z1-08
9 Ruang Rawat (RR) L3-Z1-1 L3-Z1-09 IU-AC-L3/L3-Z1-09

10 Ruang Rawat (RR) L3-Z1-2 L3-Z1-10 IU-AC-L3/L3-Z1-10 15400

11 Korridoor OK L3-Z1-1 L3-Z1-11 IU-AC-L3/L3-Z1-11 15400

12 Korridoor OK L3-Z1-2 L3-Z1-12 IU-AC-L3/L3-Z1-12


13 Korridoor OK L3-Z1-3 L3-Z1-13 IU-AC-L3/L3-Z1-13
14 OK - 1 L3-Z1-1 L3-Z1-14 IU-AC-L3/L3-Z1-14
15 OK - 1 L3-Z1-2 L3-Z1-15 IU-AC-L3/L3-Z1-15
16 OK - 1 L3-Z1-3 L3-Z1-16 IU-AC-L3/L3-Z1-16
14 Operator L3-Z1-14 IU-AC-L3/L3-Z1-14
15 C - Arm L3-Z1-1 L3-Z1-15 IU-AC-L3/L3-Z1-15
16 C - Arm L3-Z1-2 L3-Z1-16 IU-AC-L3/L3-Z1-16
17 R. Tunggu OK, ICU L3-Z1-1 L3-Z1-17 IU-AC-L3/L3-Z1-17
18 R. Tunggu OK, ICU L3-Z1-2 L3-Z1-18 IU-AC-L3/L3-Z1-18
19 R. Tunggu OK, ICU L3-Z1-3 L3-Z1-19 IU-AC-L3/L3-Z1-19
20 R. Tunggu OK, ICU L3-Z1-4 L3-Z1-20 IU-AC-L6/L3-Z1-20
21 R. Tunggu OK, ICU L3-Z1-5 L3-Z1-21 IU-AC-L6/L3-Z1-21
22 R. Tunggu OK, ICU L3-Z1-6 L3-Z1-22 IU-AC-L6/L3-Z1-22

L3 - ZONA 2

1 PICU L3-Z2-23 IU-AC-L3/L3-Z2-23 12300

2 Anteroom L3-Z2-24 IU-AC-L3/L3-Z2-24 7500

3 Isolasi L3-Z2-25 IU-AC-L3/L3-Z2-25 7500

4 ICU L3-Z2-1 L3-Z2-26 IU-AC-L3/L3-Z2-26 17100

5 ICU L3-Z2-2 L3-Z2-27 IU-AC-L3/L3-Z2-27 17100

6 NICU L3-Z2-28 IU-AC-L3/L3-Z2-28


7 PERINA L3-Z2-29 IU-AC-L3/L3-Z2-29
8 Perina non infeksius L3-Z2-30 IU-AC-L3/L3-Z2-30

9 Corridoor L3-Z2-1 L3-Z2-31 IU-AC-L3/L3-Z2-31 30700

L3 - ZONA 3
1 VK Kelas L3-Z3-1 L3-Z3-32 IU-AC-L3/L3-Z3-32
2 VK Kelas L3-Z3-2 L3-Z3-33 IU-AC-L3/L3-Z3-33
3 VK Kelas L3-Z3-3 L3-Z3-34 IU-AC-L3/L3-Z3-34
4 Linen Bersih L3-Z3-35 IU-AC-L3/L3-Z3-35
5 Corridoor L3-Z3-1 L3-Z3-36 IU-AC-L3/L3-Z3-36

L3 - ZONA 4
1 Kelas 1 Anak L3-Z4-1 L3-Z4-37 IU-AC-L3/L3-Z4-37
2 Kelas 1 Anak L3-Z4-2 L3-Z4-38 IU-AC-L3/L3-Z4-38
3 Kelas 1 Anak L3-Z4-3 L3-Z4-39 IU-AC-L3/L3-Z4-39
4 Kelas 1 Anak L3-Z4-4 L3-Z4-40 IU-AC-L3/L3-Z4-40
5 VIP Anak L3-Z4-1 L3-Z4-41 IU-AC-L3/L3-Z4-41
6 Super VIP Anak 1 L3-Z4-42 IU-AC-L3/L3-Z4-42
7 VIP Anak L3-Z4-2 L3-Z4-43 IU-AC-L3/L3-Z4-43
8 VIP Anak L3-Z4-3 L3-Z4-44 IU-AC-L3/L3-Z4-44
9 VIP Anak L3-Z4-4 L3-Z4-45 IU-AC-L3/L3-Z4-45
10 Kelas 1 Anak L3-Z4-5 L3-Z4-46 IU-AC-L3/L3-Z4-46
11 Kelas 3 Anak L3-Z4-1 L3-Z4-47 IU-AC-L3/L3-Z4-47
12 Kelas 2 Anak L3-Z4-1 L3-Z4-48 IU-AC-L3/L3-Z4-48
13 Kelas 3 Anak L3-Z4-2 L3-Z4-49 IU-AC-L3/L3-Z4-49
14 VIP Anak L3-Z4-5 L3-Z4-50 IU-AC-L3/L3-Z4-50
15 Isolasi L3-Z4-51 IU-AC-L3/L3-Z4-51
16 VIP Anak L3-Z4-6 L3-Z4-52 IU-AC-L3/L3-Z4-52
17 VIP Anak L3-Z4-7 L3-Z4-53 IU-AC-L3/L3-Z4-53
18 Koridoor L3-Z4-1 L3-Z4-54 IU-AC-L3/L3-Z4-54
19 Koridoor L3-Z4-2 L3-Z4-55 IU-AC-L3/L3-Z4-55
20 Koridoor L3-Z4-3 L3-Z4-56 IU-AC-L3/L3-Z4-56
21 Koridoor L3-Z4-4 L3-Z4-57 IU-AC-L3/L3-Z4-57
22 Koridoor L3-Z4-5 L3-Z4-58 IU-AC-L3/L3-Z4-58
23 Koridoor L3-Z4-6 L3-Z4-59 IU-AC-L3/L3-Z4-59
24 Koridoor L3-Z4-7 L3-Z4-60 IU-AC-L3/L3-Z4-60
25 Koridoor L3-Z4-8 L3-Z4-61 IU-AC-L3/L3-Z4-61

LANTAI 4
1 Kelas 3 L4-1 L4-Z1-01 IU-AC-L4/L4-Z1-01
2 Kelas 2 L4-1 L4-Z1-02 IU-AC-L4/L4-Z1-02
3 Isolasi L4-1 L4-Z1-03 IU-AC-L4/L4-Z1-03
4 Anteroom L4-Z1-04 IU-AC-L4/L4-Z1-04
5 SVIP L4-1 L4-Z1-05 IU-AC-L4/L4-Z1-05
6 Kelas 1 L4-1 L4-Z1-06 IU-AC-L4/L4-Z1-06
7 Kelas 1 L4-2 L4-Z1-07 IU-AC-L4/L4-Z1-07
8 Kelas 3 L4-2 L4-Z1-08 IU-AC-L4/L4-Z1-08
9 SVIP L4-2 L4-Z1-09 IU-AC-L4/L4-Z1-09
10 SVIP L4-3 L4-Z1-10 IU-AC-L4/L4-Z1-10
11 VIP 1 L4-1 L4-Z1-11 IU-AC-L4/L4-Z1-11
12 Kelas 1A L4-Z1-12 IU-AC-L4/L4-Z1-12
13 VIP 1 L4-2 L4-Z1-13 IU-AC-L4/L4-Z1-13
14 Kelas 1B L4-Z1-15 IU-AC-L4/L4-Z1-15
15 SVIP L4-4 L4-Z1-16 IU-AC-L4/L4-Z1-16
16 SVIP L4-5 L4-Z1-17 IU-AC-L4/L4-Z1-17
17 Kelas 1B L4-Z1-18 IU-AC-L4/L4-Z1-18
18 SVIP L4-6 L4-Z1-19 IU-AC-L4/L4-Z1-19
19 SVIP L4-7 L4-Z1-20 IU-AC-L4/L4-Z1-20
20 SVIP L4-8 L4-Z1-22 IU-AC-L4/L4-Z1-22
21 Isolasi L4-2 L4-Z1-24 IU-AC-L4/L4-Z1-24
22 Koridoor L4-1 L4-Z1-26 IU-AC-L4/L4-Z1-26
23 Koridoor L4-2 L4-Z1-27 IU-AC-L4/L4-Z1-27
24 Koridoor L4-3 L4-Z1-28 IU-AC-L4/L4-Z1-28
25 Koridoor L4-4 L4-Z1-29 IU-AC-L4/L4-Z1-29
26 Koridoor L4-5 L4-Z1-30 IU-AC-L4/L4-Z1-30
27 Koridoor L4-6 L4-Z1-31 IU-AC-L4/L4-Z1-31
28 Koridoor L4-7 L4-Z1-32 IU-AC-L4/L4-Z1-32
LANTAI 5
L5 ZONA 1

1 Linen L5-Z1-01 IU-AC-L5/L5-Z1-01 7500

2 Setrika L5-Z1-02 IU-AC-L5/L5-Z1-02 19100

3 Laundry L5-Z1-03 IU-AC-L5/L5-Z1-03 19100

4 Diklat 1 L5-Z1-04 IU-AC-L5/L5-Z1-04 7500

5 Diklat 2 L5-Z1-05 IU-AC-L5/L5-Z1-05 7500

6 Dapur L5-Z1-1 L5-Z1-06 IU-AC-L5/L5-Z1-06 15400

7 Dapur L5-Z1-2 L5-Z1-07 IU-AC-L5/L5-Z1-07 15400

8 Persiapan L5-Z1-08 IU-AC-L5/L5-Z1-08 7500

9 Koperasi L5-Z1-09 IU-AC-L5/L5-Z1-09 7500

10 Personalia mutu L5-Z1-10 IU-AC-L5/L5-Z1-10 7500

11 Adm Umum L5-Z1-11 IU-AC-L5/L5-Z1-11 19100

12 Admin Medis L5-Z1-12 IU-AC-L5/L5-Z1-12 12300

13 MM L5-Z1-13 IU-AC-L5/L5-Z1-13 19100

14 R. Direktur L5-Z1-14 IU-AC-L5/L5-Z1-14 9600

15 Korridoor L5-Z1-1 L5-Z1-15 IU-AC-L5/L5-Z1-15 24200

16 Korridoor L5-Z1-2 L5-Z1-16 IU-AC-L5/L5-Z1-16 24200

17 Korridoor L5-Z1-3 L5-Z1-17 IU-AC-L5/L5-Z1-17 24200

L5 ZONA 2

1 R. Makan L5-Z1-18 IU-AC-L5/L5-Z1-18 15400


2 Korridoor L5-Z2-1 L5-Z1-19 IU-AC-L5/L5-Z1-19 15400

3 Korridoor L5-Z2-2 L5-Z1-20 IU-AC-L5/L5-Z1-20 15400

4 Kelas 1 L5-Z2-1 L5-Z1-21 IU-AC-L5/L5-Z1-21 12300

5 Kelas 1 L5-Z2-2 L5-Z1-22 IU-AC-L5/L5-Z1-22 12300

6 Kelas 3 L5-Z2-1 L5-Z1-23 IU-AC-L5/L5-Z1-23 15400

7 Kelas 2 L5-Z2-1 L5-Z1-24 IU-AC-L5/L5-Z1-24 12300

8 Kelas 1 L5-Z2-3 L5-Z1-25 IU-AC-L5/L5-Z1-25 12300

9 Korridoor L5-Z2-3 L5-Z1-26 IU-AC-L5/L5-Z1-26 20500

10 Korridoor L5-Z2-4 L5-Z1-27 IU-AC-L5/L5-Z1-27 20500

11 Lobby Lift L5-Z2-1 L5-Z1-28 IU-AC-L5/L5-Z1-28 15400

12 Lobby Lift L5-Z2-2 L5-Z1-29 IU-AC-L5/L5-Z1-29 15400

L6 ZONA 1

1 HD Isolasi L6-Z1-01 IU-AC-L6/L6-Z1-01 9,600.00

2 Hemodialisa L6-Z1-1 L6-Z1-02 IU-AC-L6/L6-Z1-02 19,100.00

3 Hemodialisa L6-Z1-2 L6-Z1-03 IU-AC-L6/L6-Z1-03 19,101.00

4 RO L6-Z1-04 IU-AC-L6/L6-Z1-04 12,300.00

5 Koridoor & NS L6-Z1-1 L6-Z1-05 IU-AC-L6/L6-Z1-05 12,300.00

6 Koridoor & NS L6-Z1-2 L6-Z1-06 IU-AC-L6/L6-Z1-06 12,300.00

7 R. Serbaguna L6-Z1-07 IU-AC-L6/L6-Z1-07 20,500.00


8 Lobby Lift L6-Z1-1 L6-Z1-08 IU-AC-L6/L6-Z1-08 20,500.00

9 Lobby Lift L6-Z1-2 L6-Z1-09 IU-AC-L6/L6-Z1-09 12,300.00

L6 ZONA 2

1 Isoalsi L6-Z2-10 IU-AC-L6/L6-Z2-10 7,500.00

2 VIP 1 L6-Z2-1 L6-Z2-11 IU-AC-L6/L6-Z2-11 12,300.00

3 VIP 1 L6-Z2-2 L6-Z2-12 IU-AC-L6/L6-Z2-12 9,600.00

4 VIP 1 L6-Z2-3 L6-Z2-13 IU-AC-L6/L6-Z2-13 9,600.00

5 VIP 1 L6-Z2-4 L6-Z2-14 IU-AC-L6/L6-Z2-14 9,600.00

6 Kelas 1 - L6-Z2-1 L6-Z2-15 IU-AC-L6/L6-Z2-15 15,400.00

7 Kelas 1 - L6-Z2-2 L6-Z2-16 IU-AC-L6/L6-Z2-16 7,500.00

8 Kelas 1 - L6-Z2-3 L6-Z2-17 IU-AC-L6/L6-Z2-17 7,500.00

9 Kelas 1 - L6-Z2-4 L6-Z2-18 IU-AC-L6/L6-Z2-18 7,500.00

10 Kelas 1 - L6-Z2-5 L6-Z2-19 IU-AC-L6/L6-Z2-19 7,500.00

11 Kelas 1 - L6-Z2-6 L6-Z2-20 IU-AC-L6/L6-Z2-20 7,500.00

12 Kelas 1 - L6-Z2-7 L6-Z2-21 IU-AC-L6/L6-Z2-21 9,600.00

13 Deluxe 1 L6 -Z2-1 L6-Z2-22 IU-AC-L6/L6-Z2-22 7,500.00

14 Deluxe 1 L6 -Z2-2 L6-Z2-23 IU-AC-L6/L6-Z2-23 7,500.00

15 Deluxe 1 L6 -Z2-3 L6-Z2-24 IU-AC-L6/L6-Z2-24 7,500.00

16 Deluxe 1 L6 -Z2-4 L6-Z2-25 IU-AC-L6/L6-Z2-25 7,500.00

17 Kelas 1 - L6-Z2-8 L6-Z2-26 IU-AC-L6/L6-Z2-26 12,300.00


18 Korridoor L6-Z2-1 L6-Z2-27 IU-AC-L6/L6-Z2-27 19,100.00

19 Korridoor L6-Z2-2 L6-Z2-28 IU-AC-L6/L6-Z2-28 19,100.00

20 Korridoor L6-Z2-3 L6-Z2-29 IU-AC-L6/L6-Z2-29 19,100.00

21 Korridoor L6-Z2-4 L6-Z2-30 IU-AC-L6/L6-Z2-30 19,100.00

22 Korridoor L6-Z2-5 L6-Z2-31 IU-AC-L6/L6-Z2-31 19,100.00

23 Korridoor L6-Z2-6 L6-Z2-32 IU-AC-L6/L6-Z2-32 19,100.00


7 8 9 10 11

Daya Listrik Type Indoor Liquid Gas

(Watt)

1592 Unit AC Wall Mounted 2.12 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

625 Unit AC Wall Mounted 0.83 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 3/8"

625 Unit AC Wall Mounted 0.83 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 3/8"

800 Unit AC Wall Mounted 1.07 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 3/8"

1025 Unit AC Wall Mounted 1.37 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
1025 Unit AC Wall Mounted 1.37
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

1025 Unit AC Wall Mounted 1.37 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
1025 Unit AC Wall Mounted 1.37
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
625 Unit AC Wall Mounted 0.83
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 3/8"

1592 Unit AC Wall Mounted 2.12 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
625 Unit AC Wall Mounted 0.83
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 3/8"

2017 Unit AC Ceiling cassete 2.69 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

2017 Unit AC Ceiling cassete 2.69 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
2017 Unit AC Wall Mounted 2.69
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
625 Unit AC Wall Mounted 0.83 Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 3/8"

625 Unit AC Wall Mounted 0.83 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 3/8"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
625 Unit AC Wall Mounted 0.83 Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 3/8"
1417 Unit AC Ceiling cassete 1.89 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

1417 Unit AC Ceiling cassete 1.89 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

1417 Unit AC Ceiling cassete 1.89 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

1417 Unit AC Ceiling cassete 1.89 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
1417 Unit AC Ceiling cassete 1.89 Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
1417 Unit AC Ceiling cassete 1.89
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

1417 Unit AC Ceiling cassete 1.89 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
800 Unit AC Wall Mounted 1.07
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 3/8"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
625 Unit AC Wall Mounted 0.83 Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 3/8"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
1025 Unit AC Wall Mounted 1.37
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
1417 Unit AC Wall Mounted 1.89
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

1025 Unit AC Wall Mounted 1.37 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
625 Unit AC Wall Mounted 0.83
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 3/8"

625 Unit AC Wall Mounted 0.83 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 3/8"

625 Unit AC Wall Mounted 0.83 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 3/8"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
625 Unit AC Wall Mounted 0.83
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 3/8"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
800 Unit AC Wall Mounted 1.07 Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 3/8"

625 Unit AC Wall Mounted 0.83 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 3/8"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
1025 Unit AC Wall Mounted 1.37 Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"
625 Unit AC Wall Mounted 0.83 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 3/8"

1417 Unit AC Wall Mounted 1.89 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

1417 Unit AC Wall Mounted 1.89 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

1417 Unit AC Wall Mounted 1.89 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
625 Unit AC Wall Mounted 0.83 Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 3/8"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
800 Unit AC Wall Mounted 1.07
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 3/8"

1025 Unit AC Wall Mounted 1.37 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
625 Unit AC Wall Mounted 0.83
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 3/8"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
800 Unit AC Wall Mounted 1.07 Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 3/8"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
1592 Unit AC Ceiling cassete 2.12
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
1592 Unit AC Ceiling cassete 2.12 Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

1592 Unit AC Ceiling cassete 2.12 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

1592 Unit AC Ceiling cassete 2.12 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

1592 Unit AC Ceiling cassete 2.12 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

1592 Unit AC Ceiling cassete 2.12 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
1592 Unit AC Ceiling cassete 2.12
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

Daya Listrik Type Indoor

(Watt)

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
1592 Unit AC Wall Mounted 2.12 Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"
2017 Unit AC Ceiling cassete 2.69 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 3/8" Outdoor Unit d/ Pipa 5/8"

1592 Unit AC Ceiling cassete 2.12 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

625 Unit AC Wall Mounted 0.83 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 3/8"

800 Unit AC Wall Mounted 1.07 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 3/8"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
625 Unit AC Wall Mounted 0.83 Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 3/8"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
625 Unit AC Wall Mounted 0.83
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 3/8"

800 Unit AC Wall Mounted 1.07 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 3/8"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
625 Unit AC Wall Mounted 0.83
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 3/8"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
625 Unit AC Wall Mounted 0.83 Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 3/8"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
625 Unit AC Wall Mounted 0.83
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 3/8"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
625 Unit AC Wall Mounted 0.83 Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 3/8"

625 Unit AC Wall Mounted 0.83 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 3/8"

625 Unit AC Wall Mounted 0.83 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 3/8"

800 Unit AC Wall Mounted 1.07 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 3/8"

625 Unit AC Wall Mounted 0.83 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 3/8"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
1708 Unit AC Ceiling cassete 2.28
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
1708 Unit AC Ceiling cassete 2.28 Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

1708 Unit AC Ceiling cassete 2.28 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

1708 Unit AC Ceiling cassete 2.28 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
1708 Unit AC Ceiling cassete 2.28 Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"
1708 Unit AC Ceiling cassete 2.28 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

1708 Unit AC Ceiling cassete 2.28 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

1708 Unit AC Ceiling cassete 2.28 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

1708 Unit AC Ceiling cassete 2.28 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
1708 Unit AC Ceiling cassete 2.28 Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
1708 Unit AC Ceiling cassete 2.28
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

1025 Unit AC Wall Mounted 1.37 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
1025 Unit AC Wall Mounted 1.37
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

1025 Unit AC Wall Mounted 1.37 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
625 Unit AC Wall Mounted 0.83
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 3/8"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
625 Unit AC Wall Mounted 0.83
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 3/8"

625 Unit AC Wall Mounted 0.83 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 3/8"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
625 Unit AC Wall Mounted 0.83
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 3/8"

625 Unit AC Wall Mounted 0.83 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 3/8"

625 Unit AC Wall Mounted 0.83 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 3/8"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
1592 Unit AC Wall Mounted 2.12
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
1592 Unit AC Wall Mounted 2.12 Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

625 Unit AC Wall Mounted 0.83 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 3/8"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
625 Unit AC Wall Mounted 0.83 Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 3/8"
800 Unit AC Wall Mounted 1.07 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 3/8"

800 Unit AC Wall Mounted 1.07 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 3/8"

800 Unit AC Wall Mounted 1.07 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 3/8"

800 Unit AC Wall Mounted 1.07 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 3/8"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
2017 Unit AC Ceiling cassete 2.69 Outdoor Unit d/ Pipa 3/8" Outdoor Unit d/ Pipa 5/8"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
2017 Unit AC Ceiling cassete 2.69
Outdoor Unit d/ Pipa 3/8" Outdoor Unit d/ Pipa 5/8"

2017 Unit AC Ceiling cassete 2.69 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 3/8" Outdoor Unit d/ Pipa 5/8"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
2017 Unit AC Ceiling cassete 2.69
Outdoor Unit d/ Pipa 3/8" Outdoor Unit d/ Pipa 5/8"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
2017 Unit AC Ceiling cassete 2.69 Outdoor Unit d/ Pipa 3/8" Outdoor Unit d/ Pipa 5/8"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
1283 Unit AC Ceiling cassete 1.71 Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

1283 Unit AC Ceiling cassete 1.71 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"
Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
1025 Unit AC Wall Mounted 1.37 Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
625 Unit AC Wall Mounted 0.83
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 3/8"

625 Unit AC Wall Mounted 0.83 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 3/8"

1425 Unit AC Ceiling cassete 1.90 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
1425 Unit AC Ceiling cassete 1.90
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
2558 Unit AC Ceiling cassete 3.41
Outdoor Unit d/ Pipa 3/8" Outdoor Unit d/ Pipa 5/8"
Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
625 Unit AC Wall Mounted 0.83
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

1592 Unit AC Wall Mounted 2.12 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

1592 Unit AC Wall Mounted 2.12 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

625 Unit AC Wall Mounted 0.83 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
625 Unit AC Wall Mounted 0.83 Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

1283 Unit AC Wall Mounted 1.71 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
1283 Unit AC Wall Mounted 1.71
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

625 Unit AC Wall Mounted 0.83 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

625 Unit AC Wall Mounted 0.83 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

625 Unit AC Wall Mounted 0.83 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

1592 Unit AC Wall Mounted 2.12 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

1025 Unit AC Wall Mounted 1.37 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
1592 Unit AC Wall Mounted 2.12
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
800 Unit AC Wall Mounted 1.07 Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

2017 Unit AC Ceiling cassete 2.69 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

2017 Unit AC Ceiling cassete 2.69 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

2017 Unit AC Ceiling cassete 2.69 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

1283 Unit AC Wall Mounted 1.71 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"
1283 Unit AC Ceiling cassete 1.71 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

1283 Unit AC Ceiling cassete 1.71 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

1025 Unit AC Wall Mounted 1.37 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

1025 Unit AC Wall Mounted 1.37 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
1283 Unit AC Wall Mounted 1.71 Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
1025 Unit AC Wall Mounted 1.37
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

1025 Unit AC Wall Mounted 1.37 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
1708 Unit AC Ceiling cassete 2.28
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
1708 Unit AC Ceiling cassete 2.28 Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
1283 Unit AC Ceiling cassete 1.71
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
1283 Unit AC Ceiling cassete 1.71 Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

800 Unit AC Wall Mounted 1.07 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
1,592 Unit AC Ceiling cassete 2.12
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
1,592 Unit AC Ceiling cassete 2.12 Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

1,025 Unit AC Wall Mounted 1.37 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

1,025 Unit AC Ceiling cassete 1.37 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

1,025 Unit AC Ceiling cassete 1.37 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
1,708 Unit AC Ceiling cassete 2.28 Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"
1,708 Unit AC Ceiling cassete 2.28 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

1,025 Unit AC Ceiling cassete 1.37 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

625 Unit AC Wall Mounted 0.83 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

1,025 Unit AC Wall Mounted 1.37 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

800 Unit AC Wall Mounted 1.07 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

800 Unit AC Wall Mounted 1.07 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

800 Unit AC Wall Mounted 1.07 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
1,283 Unit AC Wall Mounted 1.71
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

625 Unit AC Wall Mounted 0.83 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
625 Unit AC Wall Mounted 0.83
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
625 Unit AC Wall Mounted 0.83
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

625 Unit AC Wall Mounted 0.83 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
625 Unit AC Wall Mounted 0.83
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

800 Unit AC Wall Mounted 1.07 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

625 Unit AC Wall Mounted 0.83 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
625 Unit AC Wall Mounted 0.83
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
625 Unit AC Wall Mounted 0.83 Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

625 Unit AC Wall Mounted 0.83 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
1,025 Unit AC Wall Mounted 1.37 Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"
1,592 Unit AC Ceiling cassete 2.12 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

1,592 Unit AC Ceiling cassete 2.12 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

1,592 Unit AC Ceiling cassete 2.12 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

1,592 Unit AC Ceiling cassete 2.12 Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
1,592 Unit AC Ceiling cassete 2.12 Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"

Pipa Liquid Dari Indoor Unit Ke Pipa Gas Dari Indoor Unit Ke
1,592 Unit AC Ceiling cassete 2.12
Outdoor Unit d/ Pipa 1/4" Outdoor Unit d/ Pipa 1/2"
12 13

Catatan:

- AC 1 PK Pipa Liquid 1/4" Pipa gas 3/8"

- AC 1,5 ~ 2 PK pipa Liquid 1/4" Pipa Gas 1/2"

- AC 3 PK Pipa Liquid 3/8" Pipa Gas 5/8"

- Pipa Drain PVC 20 mm diteruskan menerus ke bawah k

Instalasi Kabel Power Unit AC Dari PP AC Lt 2 Ke

d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²

Instalasi Kabel Kontrol dari Indoor Unit ke Outdoor Unit

d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20


R S T

1591.6667

/4" Pipa gas 3/8" 625

uid 1/4" Pipa Gas 1/2" 625

/8" Pipa Gas 5/8" 800

m diteruskan menerus ke bawah kemudian di 1025

1025

1025

1025

it AC Dari PP AC Lt 2 Ke 625

² dlm PVC Conduit Ø 20 mm² 1591.6667

ari Indoor Unit ke Outdoor Unit 625

² dlm PVC Conduit Ø 20 2016.6667

2016.75

2016.8333

625

625

625
1416.6667

1416.6667

1416.6667

1416.6667

1416.6667

1416.6667

1416.6667

800

625

1025

1416.6667

1025

625

625

625

625

800

625

1025
625

1416.6667

1416.75

1416.6667

625

800

1025

625

800

1591.6667

1591.6667

1591.6667

1591.6667

1591.6667

1591.6667

1591.6667

Anda mungkin juga menyukai