REKAPITULASI

HARGA PERKIRAAN SENDIRI (HPS)


PEKERJAAN : REHABILITASI GEDUNG KANTOR BIRO LAYANAN PENGADAAN BARANG DAN JASA PROVINSI PAPUA
LOKASI : KOMPLEKS GEDUNG KANTOR GUBERNUR PROVINSI PAPUA
TH ANGGARAN : 2019

JUMLAH
NO JENIS PEKERJAAN (Rp.)

I PEKERJAAN ARSITEKTUR
A PEKERJAAN DINDING 30,509,867
B PEKERJAAN PLAFOND 9,457,161
C PEKERJAAN PINTU 451,986

REAL COST 40,419,013.67


PPN 10 % 4,041,901.37
REAL COST + PPN 10% 44,460,915.04
Perencanaan 4% 1,778,436.60
Pengawasan 2% 889,218.30
JUMLAH 47,128,569.94
RENCANA ANGGARAN BIAYA (R.A.B.)

PEKERJAAN : PERENCANAAN PEMBANGUNAN RUANG INTENSIVE CARDIAC


CARE (JANTUNG TERPADU DAN STROKE)
LOKASI : PROVINSI PAPUA
TH ANGGARAN : 2018

JUMLAH HARGA
NO JENIS PEKERJAAN SAT VOL. HARGA SATUAN (Rp.) (Rp.)

I PEKERJAAN PERSIAPAN
1 Mob & Demob peralatan ls -
2 Pengukuran dan bouwplank m2 80.00 - -
3 Pagar pengaman proyek setinggi 2 m m2 16.00 - -
4 Kantor Lapangan Kontraktor m2 18.00 - -
5 Pembuatan Gudang Semen dan Alat Kerja m2 14.00 - -
6 Papan Nama Kegiatan bh 1.00 - -
7 Bedeng Pekerja m2 24.00 - -
SUB TOTAL PEKERJAAN PERSIAPAN I. -
II PEKERJAAN ARSITEKTUR
A LANTAI BASEMENT
A PEKERJAAN LANTAI
1 Pek. Pemasangan Vinyl floring ex.LG Haust Medistep m2 239.72 - -
2 Pek. Pemasangan Plin Radius m 119.86 - -
3 Pek. Waterprofing m2 29.06 - -
4 Pek. Pemasangan Lantai keramik 60x60 m2 133.84 - -
5 Pek. Pemasangan Lantai keramik 40x40 m2 68.49 - -
6 Pek. Pemasangan Lantai keramik 20x20 m2 29.06 - -
7 Step nosing tangga 10 x 40 cm m 237.60 110,000.00 26,136,000.00
8 Pek. Scred plat Ramp m2 22.40 93,000.00 2,083,200.00
SUB TOTAL III. A.1 -

A.2 Lantai 2
1 Pek. Waterprofing m2 64.05 - -
2 Pek. Pemasangan Lantai keramik 60x60 m2 314.11 - -
3 Pek. Pemasangan Lantai keramik 40x40 m2 92.95 - -
4 Pek. Pemasangan Lantai keramik 20x20 m2 64.05 - -
5 Step nosing tangga 10 x 40 cm m 237.60 110,000.00 26,136,000.00
6 Pek. Scred plat Ramp m2 22.40 93,000.00 2,083,200.00
SUB TOTAL III. A.2 -

A.3 Lantai 3
1 Pek. Waterprofing m2 64.05 - -
2 Pek. Pemasangan Lantai keramik 60x60 m2 314.11 - -
3 Pek. Pemasangan Lantai keramik 40x40 m2 92.95 - -
4 Pek. Pemasangan Lantai keramik 20x20 m2 64.05 - -
SUB TOTAL III. A.3 -

A.4 Lantai Atap


1 Pek. Scred plat lantai atap (2-3 cm) m3 40.00 - -
2 Pek. Waterprofing m2 560.56 - -
3 Pek. Waterprofing atap house lift m2 109.22 - -
SUB TOTAL III. A.4 -
SUB TOTAL III. A -

B PEKERJAAN DINDING
B.1 Lantai 1
1 Pek. Dinding Batu Tela m2 910.58 - -
2 Pek. Plesteran m2 1,821.17 - -
3 Pek. Acian m2 1,703.71 - -
4 Pek. Dinding Partisi GRC Double Fin. 6 mm Rangka Holo m2 30.12 - -
Pek. Dinding Partisi GRC Double Fin. 4 mm Rangka Holo double
5 Pek. Dinding Keramik 20x250 cm m2 95.58 - -
6 Pek. Pembuatan meja beton m2 2.20 - -
7 Pek. Pengecatan Dinding Dalam m2 1,362.97 - -
8 Pek. Pengecatan Dinding Luar m2 340.74 - -
SUB TOTAL III. B.1 -

B.2 Lantai 2
1 Pek. Dinding Batu Tela m2 1,017.92 - -
2 Pek. Plesteran m2 2,035.85 - -
3 Pek. Acian m2 1,898.01 - -
4 Pek. Dinding Keramik 20x250 cm m2 129.30 - -
5 Pek. Pembuatan meja beton m2 1.50 - -
6 Pek. Pengecatan Dinding Dalam m2 1,518.41 - -
7 Pek. Pengecatan Dinding Luar m2 379.60 - -
SUB TOTAL III. B.2 -

B.3 Lantai 3
1 Pek. Dinding Batu Tela m2 1,017.92 - -
2 Pek. Plesteran m2 2,035.85 - -
3 Pek. Acian m2 1,896.02 - -
4 Pek. Dinding Keramik 20x250 cm m2 129.30 - -
5 Pek. Pembuatan meja beton m2 1.10 - -
6 Pek. Pengecatan Dinding Dalam m2 1,516.82 - -
7 Pek. Pengecatan Dinding Luar m2 379.20 - -
SUB TOTAL III. B.3 -

B.5 Alumunium Composite Panel


1 Pek. Alumunium Composite Panel (ACP) lantai 1 m2 117.46 - -
2 Pek. Alumunium Composite Panel (ACP) lantai 2 m2 137.84 - -
3 Pek. Alumunium Composite Panel (ACP) lantai 3 m2 139.83 - -
SUB TOTAL III. B.5 -
SUB TOTAL III. B -

C PEKERJAAN PINTU
C.1 Lantai 1
1 (PK1) Kusen almunium Pintu kaca tempered 102mm bh 1.00 - -

2 (PK2)Kusen aluminium 4"powder coating White ex YKK


Daun pintu multiplek 4 cm motif teakwood + accsories + handle & lock Ex Dekson bh 3.00 - -
Daun jendela kaca mati polos 6 mm

3 (P1) Kusen aluminium 4"powder coating White ex YKK bh 13.00 - -


Daun pintu multiplek 4 cm motif teakwood + accsories + handle & lock Ex Dekson
Daun jendela kaca mati polos 6 mm

4 (P2) Kusen aluminium 4"powder coating White ex YKK bh 7.00 - -


Daun pintu multiplek 4 cm motif teakwood + accsories + handle & lock Ex Dekson

5 (P3) Kusen aluminium 4"powder coating White ex YKK bh 2.00 - -


Daun pintu multiplek 4 cm motif teakwood + accsories + handle & lock Ex Dekson
Daun jendela kaca mati polos 6 mm

6 (P4) Kusen aluminium 4"powder coating White ex YKK bh 4.00 - -


Daun pintu multiplek 4 cm motif teakwood + accsories + handle & lock Ex Dekson

SUB TOTAL III. C.1 -

C.2 Lantai 2
1 (PK2)Kusen aluminium 4"powder coating White ex YKK -
Daun pintu multiplek 4 cm motif teakwood + accsories + handle & lock Ex Dekson bh 3.00 - -
Daun jendela kaca mati polos 6 mm
2 (PK3)Kusen aluminium 4"powder coating White ex YKK
Daun pintu multiplek 4 cm motif teakwood + accsories + handle & lock Ex Dekson bh 2.00 - -
Daun jendela kaca mati polos 6 mm

3 (P1) Kusen aluminium 4"powder coating White ex YKK bh 13.00 - -


Daun pintu multiplek 4 cm motif teakwood + accsories + handle & lock Ex Dekson
Daun jendela kaca mati polos 6 mm

4 (P2) Kusen aluminium 4"powder coating White ex YKK bh 7.00 - -


Daun pintu multiplek 4 cm motif teakwood + accsories + handle & lock Ex Dekson

5 (P3) Kusen aluminium 4"powder coating White ex YKK bh 3.00 - -


Daun pintu multiplek 4 cm motif teakwood + accsories + handle & lock Ex Dekson
Daun jendela kaca mati polos 6 mm

6 (P4) Kusen aluminium 4"powder coating White ex YKK bh 4.00 - -


Daun pintu multiplek 4 cm motif teakwood + accsories + handle & lock Ex Dekson

SUB TOTAL III. C.2 -

C.3 Lantai 3
1 (PK2)Kusen aluminium 4"powder coating White ex YKK
Daun pintu multiplek 4 cm motif teakwood + accsories + handle & lock Ex Dekson bh 1.00 - -
Daun jendela kaca mati polos 6 mm

2 (PK3)Kusen aluminium 4"powder coating White ex YKK


Daun pintu multiplek 4 cm motif teakwood + accsories + handle & lock Ex Dekson bh 2.00 - -
Daun jendela kaca mati polos 6 mm

3 (P1) Kusen aluminium 4"powder coating White ex YKK bh 13.00 - -


Daun pintu multiplek 4 cm motif teakwood + accsories + handle & lock Ex Dekson
Daun jendela kaca mati polos 6 mm

4 (P2) Kusen aluminium 4"powder coating White ex YKK bh 7.00 - -


Daun pintu multiplek 4 cm motif teakwood + accsories + handle & lock Ex Dekson

5 (P3) Kusen aluminium 4"powder coating White ex YKK bh 4.00 - -


Daun pintu multiplek 4 cm motif teakwood + accsories + handle & lock Ex Dekson
Daun jendela kaca mati polos 6 mm

6 (P4) Kusen aluminium 4"powder coating White ex YKK bh 4.00 - -


Daun pintu multiplek 4 cm motif teakwood + accsories + handle & lock Ex Dekson

SUB TOTAL III. C.3 -


SUB TOTAL III. C -

D PEKERJAAN JENDELA
D.1 Lantai 1
1 (J1) Alumunium Window, Auning Double leaf ex. YKK/BOSTINCO bh 9.00 - -
/ METALINDO, Glass with frame Finish Pouder Coating (refer
Drawing)
2 (J2) Kusen aluminium 4"powder coating White ex YKK bh 3.00 - -
Frame casment ex YKK + accsesories
Kaca 6 mm polos
3 (J3) Kusen aluminium 4"powder coating White ex YKK bh 4.00 - -
Frame casment ex YKK + accsesories
Kaca 6 mm polos
4 (J4) Kusen aluminium 4"powder coating White ex YKK bh 3.00 - -
Frame casment ex YKK + accsesories
Kaca 6 mm polos
5 (J5) Kusen aluminium 4"powder coating White ex YKK bh 3.00 - -
Frame casment ex YKK + accsesories
Kaca 6 mm polos
SUB TOTAL III. D.1 -

D.2 Lantai 2
1 (J1) Alumunium Window, Auning Double leaf ex. YKK/BOSTINCO bh 10.00 - -
/ METALINDO, Glass with frame Finish Pouder Coating (refer
Drawing)
2 (J2) Kusen aluminium 4"powder coating White ex YKK bh 1.00 - -
Frame casment ex YKK + accsesories
Kaca 6 mm polos
3 (J3) Kusen aluminium 4"powder coating White ex YKK bh 4.00 - -
Frame casment ex YKK + accsesories
Kaca 6 mm polos
4 (J4) Kusen aluminium 4"powder coating White ex YKK bh 2.00 - -
Frame casment ex YKK + accsesories
Kaca 6 mm polos
5 (J5) Kusen aluminium 4"powder coating White ex YKK bh 3.00 - -
Frame casment ex YKK + accsesories
Kaca 6 mm polos
SUB TOTAL III. D.2 -

D.3 Lantai 3
1 (J1) Alumunium Window, Auning Double leaf ex. YKK/BOSTINCO bh 10.00 - -
/ METALINDO, Glass with frame Finish Pouder Coating (refer
Drawing)
2 (J2) Kusen aluminium 4"powder coating White ex YKK bh 2.00 - -
Frame casment ex YKK + accsesories
Kaca 6 mm polos
3 (J3) Kusen aluminium 4"powder coating White ex YKK bh 6.00 - -
Frame casment ex YKK + accsesories
Kaca 6 mm polos
4 (J4) Kusen aluminium 4"powder coating White ex YKK bh 3.00 - -
Frame casment ex YKK + accsesories
Kaca 6 mm polos
5 (J4) Kusen aluminium 4"powder coating White ex YKK bh 3.00 - -
Frame casment ex YKK + accsesories
Kaca 6 mm polos
SUB TOTAL III. D.3 -
SUB TOTAL III. D -

E PEKERJAAN SANITAIR
E.1 Lantai 1
1 Pek. Closed duduk Ex. Toto dan Jet shower + asesoris bh 9.00 3,893,769.00 35,043,921.00
2 Pek. Wastafel Wall hung ex. Toto bh 11.00 2,048,017.95 22,528,197.45
3 Kran shower kamar mandi panas dingin ex toto bh 11.00 1,975,000.00 21,725,000.00
4 Kran dinding ex toto bh 11.00 175,000.00 1,925,000.00
5 Spool Hook Type SK 33 Tot bh 2.00 11,150,000.00 22,300,000.00
6 Floor Drain bh 9.00 534,000.00 4,806,000.00
SUB TOTAL III. E.1 108,328,118.45

E.2 Lantai 2
1 Pek. Closed duduk Ex. Toto dan Jet shower + asesoris bh 11.00 3,893,769.00 42,831,459.00
2 Pek. Wastafel Wall hung ex. Toto bh 11.00 2,048,017.95 22,528,197.45
3 Kran shower kamar mandi panas dingin ex toto bh 11.00 1,975,000.00 21,725,000.00
4 Kran dinding ex toto bh 11.00 175,000.00 1,925,000.00
5 Spool Hook Type SK 33 Tot bh 2.00 11,150,000.00 22,300,000.00
6 Floor Drain bh 11.00 534,000.00 5,874,000.00
SUB TOTAL III. E.2 117,183,656.45

E.3 Lantai 3
1 Pek. Closed duduk Ex. Toto dan Jet shower + asesoris bh 11.00 3,893,769.00 42,831,459.00
2 Pek. Wastafel Wall hung ex. Toto bh 11.00 2,048,017.95 22,528,197.45
3 Kran shower kamar mandi panas dingin ex toto bh 11.00 1,975,000.00 21,725,000.00
4 Kran dinding ex toto bh 11.00 175,000.00 1,925,000.00
5 Spool Hook Type SK 33 Tot bh 2.00 11,150,000.00 22,300,000.00
6 Floor Drain bh 11.00 534,000.00 5,874,000.00
SUB TOTAL III. E.23 117,183,656.45
SUB TOTAL III. E 342,695,431.35

F PEKERJAAN PLAFOND

1 Pek Plavond PVC 8mm berikut rangka besi hollow Lt.1 m2 535.16 - -

2 Pek Plavond PVC 8mm berikut rangka besi hollow Lt.2 m2 535.16 - -

3 Pek Plavond PVC 8mm berikut rangka besi hollow Lt.3 m2 535.16 - -

SUB TOTAL III. F -

G PEKERJAAN LAIN-LAIN

1 Pek. Railing tangga lantai 1,2 & 3 m 54.00 867,698.56 46,855,722.38


2 Pek. Railing Ramp Lt. 1,2 & 3
Railing Ram pipa stainless 6 cm m 119.00 867,698.56 103,256,128.94
Railing Ram pipa stainless 4 cm m 72.50 867,698.56 62,908,145.78
Railing Ram pipa stainless 2 cm m 200.00 867,698.56 173,539,712.50
SUB TOTAL III. G 386,559,709.59
SUB TOTAL PEKERJAAN ARSITEKTUR III. -

IV PEKERJAAN MEKANIKAL, ELEKTRIKAL & PLUMBING


A PEKERJAAN PEMADAM KEBAKARAN
A.1 Lantai 1
1 PEKERJAAN PERALATAN UTAMA
Pengadaan dan pemasangan peralatan utama termasuk
Base plate, Coupling base, Vibration isolator dll.

1.1. ELECTRIC FIRE PUMP unit 1.00 Err:509 -


Kapasitas : 500 US Gpm./ 1500 Lpm
Total head : 30 Meter
Jenis : Centryfugal end suction
Power consumtions : 90.8 KW/220-380V/3P/50Hz.
Speed : 1500 Rpm.
Casing : Cast iron.
Impeller : Bronze
Shaft Seal : Mechanical seal, Gland packing
Staffing box, or equal
Shaft : SS 403
Insulation : IP 55 / ODP
Type of motor : Totally enclosed fan cooled
Efficiency min. : 60%
Control system : Pressure switch
Opertion : Auto & Manual

1.2. JOCKEY FIRE PUMP unit 1.00 Err:509 -


Kapasitas : 10 US Gpm.
Total head : 30 Meter
Jenis : Vertical In Line
Power consumtions : 1.4 KW/220-380V/3P/50Hz.
Speed : 1500 Rpm.
Casing : Cast iron.
Impeller : Bronze
Shaft Seal : Mechanical seal, Gland packing
Staffing box, or equal
Shaft : SS 403
Insulation : IP 55 / ODP
Type of motor : Totally enclosed fan cooled
Efficiency min. : 60%
Control system : Pressure switch
Opertion : Auto & Manual

1.3. DIESEL FIRE PUMP unit 1.00 Err:509 -


FIRE PUMP
Kapasitas : 500 US Gpm.
Total head : 30 Meter
Jenis : Centryfugal end suction
Power consumtions : 90.75 KW/220-380V/3P/50Hz.
Speed : 2.900 Rpm.
Casing : Cast iron.
Impeller : Bronze
Shaft Seal : Mechanical seal, Gland packing
Staffing box, or equal
Shaft : SS 403
Insulation : IP 55 / ODP
Type of motor : Totally enclosed fan cooled
Efficiency min. : 60%
Control system : Pressure switch
Opertion : Auto & Manual

DIESEL ENGINE
Diesel engine with hot start arranged for dual batery
automatic operation rated for 91 HP at 3.000 rpm.
on the common baseplate and complete with accessories
as follow :
- 1 set Automatic & manual diesel controller
- 1 set battery + charger for weekly test start.
- 1 Pc. Hot gas muffler.
- 1 Pc. Pressure relief valve.
- 1 Pc. Automatic air release valve.
- 1 Pc. Suction & discharge gauge.

1.3. PRESSURE TANK unit 1.00 Err:509 -


Kapasitas : 500 Liter.
Type : Diafragma Tank.
Tekanan kerja : 10 Kg/cm2.
Test tekanan : 20 Kg/cm2.
Material : Mild steel.
Accessories : - Gate valve, K16 dia. 2" (2 buah)
- Ball valve, K16 dia. 1/2" (4 buah)
- Ball valve, K16 dia.1 1/4" (1 buah)
- Safety valve dia.1 1/4", K16 (1 buah)
- Air vent dia.1 1/4", K16 (1 buah)
- Pressure gauge dia.6", range 0-15 Bar
(1 buah)
- Pressure switch, range 0-15 Bar
(3 buah)

1.4. Indoor Hydrant Box, dimensi sesuai gambar, lengkap unit 2.00 Err:509 -
dengan :
- Fire hose dia. 40 mm, panjang 30 m.
- Straight nozzle & Cuick connector.
- Hose rack.
- Main valve dia. 2 1/2"
- Hydrant valve dia. 1 1/2"
- Control valve dia. 1 1/2"
- Landing valve dia. 2 1/2", dll.
- Fire extinguisher dry chemical powder 6 Kg.
- Dll.
SUB TOTAL IV. 1 -
2 PEKERJAAN PERALATAN PENGATUR
Pengadaan dan pemasangan valve lengkap
denganaccessories

2.1. Strainer, Cast iron class K10


- dia. 6" (di pipa isap fire pump) bh 2.00 Err:509 -
- dia. 1 1/2" (di pipa isap jockey pump) bh 1.00 Err:509 -
2.2. Flexible connection, class K10
- dia. 6" (di pipa isap fire pump) bh 2.00 Err:509 -
- dia. 1 1/2" (di pipa isap jockey pump) bh 1.00 Err:509 -
2.3. Gate valve, Cast iron class K10
- dia. 6" (di pipa isap fire pump) bh 2.00 Err:509 -
- dia. 1 1/2" (di pipa isap jockey pump) bh 1.00 Err:509 -
2.4. Gate valve, Cast iron class K10
- dia. 6" (di pipa isap Tank ke header fire pump) bh 2.00 Err:509 -
2.5. Gate valve, Cast iron class K16
- dia. 6" (di pipa tekan fire pump) bh 2.00 Err:509 -
- dia. 1 1/2" (di pipa tekan jockey pump) bh 1.00 Err:509 -
2.6. Gate valve, Cast iron class K16
- dia. 6" (pada header, ke hydrant, sprinkler, by pass) bh 1.00 Err:509 -
- dia. 1 1/2" (pada header, ke pressure tank) bh 1.00 Err:509 -
2.7. Butterfly valve, Cast iron class K16
- dia. 6" (pada header test flow) bh 1.00 Err:509 -
2.8. Check valve, Cast iron class K16
- dia. 6" (di pipa tekan fire pump) bh 2.00 Err:509 -
- dia. 1 1/2" (di pipa tekan jockey pump) bh 1.00 Err:509 -
2.9. Ball valve, Cast iron class K16
- dia. 1 1/4" (pada header) bh 2.00 Err:509 -
2.10. Safety valve, Cast iron class K16
- dia. 1 1/4" (pada header) bh 1.00 Err:509 -
2.11. Air vent, Cast iron class K16
- dia. 1 1/4" (pada header) bh 1.00 Err:509 -
2.12. Flow Meter dia. 6" bh 1.00 Err:509 -
2.13. Accessories (dudukan valve, mur+baut, packing set dll) ls 1.00 Err:509 -
SUB TOTAL IV. 2 -
SUB TOTAL IV.A -

B PEKERJAAN GAS MEDIS

B.1 PEKERJAAN INSTALASI GAS SENTRAL


1 SENTRAL O2 AUTOMATIC 2 X 12 unit -
Automatic Change Over Manifold - HCM
HP Filter
Header Ø3/4
Cylinder Valve
Block Cylinder Valve
HP Cylinder Lead
HP Cylinder Lead Manifold
Cylinder Rack & Support (Bracket)
Safety Valve Low Pressure
Pressure Gauge Low Pressure
Main Valve

2 SENTRAL N2O AUTOMATIC 2 X 3 unit -


Automatic Change Over Manifold - MT5
HP Filter
Header Ø3/4
Cylinder Valve
Block Cylinder Valve
HP Cylinder Lead
HP Cylinder Lead Manifold
Cylinder Rack & Support (Bracket)
Safety Valve Low Pressure
Pressure Gauge Low Pressure
Main Valve

3 SENTRAL COMPRESSED AIR unit -


1. Oil Free Air Compressor
Capacity : 240 liter/menit
Motor : 2,2 kw/380V/3ph
2. Air Dryer c/w After Cooler
3. Receiver Tank
4. Filtration :
Pre Filter
After Filter
Carbon Filter
5. Air Regulator
6. Control Panel
7. Support / Consumable Material

4 OIL LUBRICATED ROTARY VANE VACUUM PUMP unit -


Spesifikasi :
a. Vacuum Pump - U.4.165 SAK
Motor : 4 Kw, 3 Phase, 380 Volt, 50 Hz
Capacity : 160 m3/jam ~ 2666 liter/min
Vacuum : 3 mbar abs.
b. Receiver Tank 1000 Ltr Vertikal
c. Vacuum Filter
Model : A153MV
d. Control Panel
e. Support / Consumable Material

5 Sentral Alarm Panel Type 2 Gas (O,N,A,V) unit -

B.2 INTERKONEKSI PIPA GAS MAEDIS DARI SENTRAL KE GEDUNG


SENTRAL KE GEDUNG (Sentral Gas - Gedung)
1 a. Instalasi Oksigen ( O2 ) ASTM B.819 Type Medical Gas
Diameter 1 " m -
copper fittings lot -
2 b. Instalasi Vacuum ( N2O ) ASTM B.819Type Medical Gas
Diameter 1 " m -
copper fittings lot -
3 c. Instalasi Oksigen ( A ) ASTM B.819 Type Medical Gas
Diameter 1 " m -
copper fittings lot -
4 d. Instalasi Vacuum ( V ) ASTM B.819 Type Medical Gas
Diameter 1 " m -
copper fittings lot -
5 e. Gate valve diameter 4" bh -

B.3 INSTALASI PIPA SHAFT (Standart ASTM B.819 Type L)


1 Pipa Tembaga Ø 1 1/8” (O2) m -
2 Pipa Tembaga Ø 7/8” (N2O) m -
3 Pipa Tembaga Ø 1 1/8” (Comp.Air) m -
4 Pipa Tembaga Ø 1 1/8” (Vacuum) m -
5 Fitting Tembaga lot -
6 Material pembantu ls -
7 Ball Valve Kitz Uk Ø 3/4” c/w Niple bh -
-
B.4 INSTALASI PIPA Lt. 1 (Standart ASTM B.819 Type L)
B.4.1 Instalasi Pipa Oxygen
1 Pipa Tembaga Ø 3/4” m -
2 Pipa Tembaga Ø 1/2” m -
3 Pipa Tembaga Ø 3/8” m -
4 Fitting Tembaga lot -
5 NSV Wall Outlet O2 ex C&U bh -
6 Material pembantu ls -

B.4.2 Instalasi Pipa Vacuum


1 Pipa Tembaga Ø 3/4” m -
2 Pipa Tembaga Ø 1/2” m -
3 Fitting Tembaga lot -
4 NSV Wall Outlet O2 ex C&U bh -
5 Material pembantu ls -

B.4.3 Shut Off Valve Type II (OV) bh -


B.4.4 Panel Alarm Gas Type II (OV) bh -

B.5 INSTALASI PIPA Lt.2 (Standart ASTM B.819 Type L)


B.5.1 Instalasi Pipa Oxygen
1 Pipa Tembaga Ø 3/4” m -
2 Pipa Tembaga Ø 5/8” m -
3 Pipa Tembaga Ø 1/2” m -
4 Pipa Tembaga Ø 3/8” m -
5 Fitting Tembaga lot -
6 NSV Wall Outlet O2 ex C&U bh -
7 Material pembantu ls -

B.5.2 Instalasi Pipa Comp. Air


1 Pipa Tembaga Ø 3/4” m -
2 Pipa Tembaga Ø 5/8” m -
3 Pipa Tembaga Ø 1/2” m -
4 Pipa Tembaga Ø 3/8” m -
5 Fitting Tembaga lot -
6 NSV Wall Outlet Comp. Air ex C&U bh -
7 Material pembantu ls -

B.5.3 Instalasi Pipa Vacuum


1 Pipa Tembaga Ø 3/4” m -
2 Pipa Tembaga Ø 5/8” m -
3 Pipa Tembaga Ø 1/2” m -
4 Fitting Tembaga lot -
5 NSV Wall Outlet Vacuum ex C&U bh -
6 Material pembantu ls -

B.5.4 Shut Off Valve Type III (OAV) bh -


B.5.5 Panel Alarm Gas Type III (OAV) bh -

B.6 INSTALASI PIPA Lt. 3 (Standart ASTM B.819 Type L)


B.6.1 Instalasi Pipa Oxygen
1 Pipa Tembaga Ø 3/4” m -
2 Pipa Tembaga Ø 5/8” m -
3 Pipa Tembaga Ø 1/2” m -
4 Pipa Tembaga Ø 3/8” m -
5 Fitting Tembaga lot -
6 NSV Wall Outlet O2 ex C&U bh -
7 Material pembantu ls -

B.6.2 Instalasi Pipa Comp. Air -


2 Pipa Tembaga Ø 3/4” m
2 Pipa Tembaga Ø 5/8” m -
3 Pipa Tembaga Ø 1/2” m -
4 Pipa Tembaga Ø 3/8” m -
5 Fitting Tembaga lot -
6 NSV Wall Outlet Comp. Air ex C&U bh -
7 Material pembantu ls -

B.6.3 Instalasi Pipa Vacuum


1 Pipa Tembaga Ø 3/4” m -
2 Pipa Tembaga Ø 5/8” m -
3 Pipa Tembaga Ø 1/2” m -
4 Fitting Tembaga lot -

B.6.4 Shut Off Valve Type III (OAV) bh -


B.6.5 Panel Alarm Gas Type III (OAV) bh -

B.7 TESTING COMMISSIONING


1 Testing Commissioning ls -

SUB TOTAL IV.B -

C PEKERJAAN BED HEAD

C.1 PEKERJAAN BEDHEAD UNIT LANTAI 1


PROFILE BEDHEAD [ SINGLE UNIT ]
Model : Bedhead single unit unit -
Type : HD2282
Dims : 1200 mm x 80 mm x 2200 mm
Assesories :
1 x power plug Double Gang merk Schneider unit -
1 x power plug Universal merk Schneider unit -
1 x power switch merk Schneider unit -
1 x Reading Lamp T5 - 8Watt c/w cover unit -
1 x provision for nurse call ttk -
1 x provision for medical gas ( Oxygen ) ttk -
1 x Jasa Pemasangan Bedhead unit -

C.2 PEKERJAAN BEDHEAD UNIT LANTAI 2


PROFILE BEDHEAD [ SINGLE UNIT ]
Model : Bedhead single unit unit -
Type : HD2282
Dims : 1200 mm x 80 mm x 2200 mm
Assesories :
1 x power plug Double Gang merk Schneider unit -
1 x power plug Universal merk Schneider unit -
1 x power switch merk Schneider unit -
1 x T4 Fluoresent Lamp for direct light unit -
1 x provision for nurse call ttk -
1 x provision for medical gas ( Oxygen ) ttk -
1 x Jasa Pemasangan Bedhead unit -

C.3 PEKERJAAN BEDHEAD UNIT LANTAI 3


PROFILE BEDHEAD [ SINGLE UNIT ]
Model : Bedhead single unit unit -
Type : HD2282
Dims : 1200 mm x 80 mm x 2200 mm
Assesories :
1 x power plug Double Gang merk Schneider unit -
1 x power plug Universal merk Schneider unit -
1 x power switch merk Schneider unit -
1 x T4 Fluoresent Lamp for direct light unit -
1 x provision for nurse call ttk -
1 x provision for medical gas ( Oxygen ) ttk -

` SUB TOTAL IV.C -

D PEKERJAAN PNEUMATIK

` SUB TOTAL IV.D

E PEKERJAAN GENSET
E.1 PEKERJAAN PENGADAAN DAN
PEMASANGAN GEN-SET

CAT ENGINE Unit 1.00 Err:509 -


1000 kVA Prime Rating
Manufacture :
Country of Origin :
Model : Caterpillar C32 (Turbocharged Aftercooler)
Speed : 1.500 Rpm.
Frequency : 50 Hz.
Power factor : 0,8 logging
Cylinder :
Configuration :
Automatic shutdown devic : Electronic Governor
Governor

E.2 ALTERNATOR Incl. -


Country of Origin :
Merk / produk : Caterpillar
Model : Caterpillar C32 (Turbocharged Aftercooler)
Speed :
Kapasitas : 1000 kVA
Instalation class : H

E.3 Acc. / Buku petunjuk pengoperasian dan


pemeliharaan
- Engine operation book
- Maintenance & manual book
- Engine part Catalog
- Factory test certificate
- Standard tools
- Vibration isolator (Rubbering type)
- Garansi peralatan 2.000 Jam / tahun

E.4 Pemasangan Generator set termasuk


setting, levelling dan penyediaan peralatan
berat+peralatan kerja (forklif, tackle dll.) unit -
` SUB TOTAL IV.E -

F PEKERJAAN ELEKTRIKAL

F.1 LANTAI 1
1 PERALATAN UTAMA

1.1 PANEL PUTM 1 Incoming 1 Outgoing unit Err:509 Err:509 -


Sesuai gambar dan spesifikasi teknis.
Type : Floor standing cubicle.
Standard : IEC 439-1, BS 5486-1, IP B3055.
Dimensi : sesuai shop drawing supplier/pabrik.

1.2 Trafo Kapasitas 800 kVA 3P 50 HZ unit Err:509 Err:509 -


Type : Oil Immersed
Step down DyN5
Kapasitas : 630 kVA
Cooling : Onan

1.3 Capacitor bank. unit Err:509 Err:509 -


Sesuai gambar dan spesifikasi teknis.
Rated output : 250 KVAR.
Type : Floor standing cubicle.
Standard : IEC 439-1, BS 5486-1, IP B3055.
Dimensi : sesuai shop drawing supplier/pabrik.

1.4 PANEL DISTRIBUSI


Sesuai gambar dan spesifikasi teknis.
terbuat dari plat baja, tebal 2 mm diproses anti karat dan
di cat bakar.
Type : Wall Mounted cubicle.
Dimensi : sesuai shop drawing supplier/pabrik.

1.4.1 Panel MDP-PEMADAM unit Err:509 Err:509 -


1.4.2 Panel MDP-PLUMBING unit Err:509 Err:509 -
1.4.3 Panel DP-PARKIR unit Err:509 Err:509 -
1.4.4 Panel SDP-AC unit Err:509 Err:509 -

1.4.5 DIESEL ENGINE unit Err:509 Err:509 -


500 kVA Prime Rating
Manufacture
Country of Origin
Model
Speed
Frequency
Power factor
Cylinder
Configuration
Automatic shutdown device
Governor

2 KABEL FEEDER TEGANGAN RENDAH

2.1 Dari PUTR ke SDP-L.ATAP, Kabel NYY 5x10mm2 m Err:509 Err:509 -


2.2 Dari PUTR ke PK-LIFT/P, Kabel NYY 5x10mm2 m Err:509 Err:509 -
2.3 Dari PUTR ke PK-LIFT/BED, Kabel NYY 5x10mm2 m Err:509 Err:509 -
2.4 Dari PUTR ke SDP-AC, Kabel NYY 5x10mm2 m Err:509 Err:509 -
2.5 Dari PUTR ke PP-L.1, Kabel NYY 5x10mm2 m Err:509 Err:509 -
2.6 Dari PUTR ke PP-L.2, Kabel NYY 5x10mm2 m Err:509 Err:509 -
2.7 Dari PUTR ke PP-L.3, Kabel NYY 5x10mm2 m Err:509 Err:509 -
2.8 Dari PUTR ke PP-L.ATAP, Kabel NYY 5x6mm2 m Err:509 Err:509 -
2.9 Dari PUTR ke PP-VAC L.ATAP, Kabel NYY 5x10mm2 m Err:509 Err:509 -
2.1 Dari PUTR ke PP-VAC L.4, Kabel NYY 5x16mm2 m Err:509 Err:509 -
2.11 Dari PUTR ke PP-VAC L.3, Kabel NYY 5x16mm2 m Err:509 Err:509 -
2.12 Dari PUTR ke PP-VAC L.2, Kabel NYY 5x16mm2 m Err:509 Err:509 -
2.13 Dari PUTR ke PP-VAC L.1, Kabel NYY 5x16mm2 m Err:509 Err:509 -
2.14 Dari PUTR ke PP-PUMP L.1, Kabel NYY 4x1x(120mm2) m Err:509 Err:509 -
+ NYAF 70mm2
2.15 Dari PUTR ke PP-LIFT L.DAK, Kabel NYY 5x10mm2 m Err:509 Err:509 -
2.16 Dari PUTR ke PP-HW L.DAK, Kabel NYY 5x16mm2 m Err:509 Err:509 -

3 CABLE LADDER
u/ Kabel Tegangan Rendah

3.1 Straight ladder


Ukuran 600 mm m Err:509 Err:509 -
Ukuran 300 mm m Err:509 Err:509 -
Ukuran 200 mm m Err:509 Err:509 -
3.2 Fitting-fitting : lot Err:509 Err:509 -
3.3 Accessories : Err:509 Err:509
Joint set, horizontal/vertical fishplate, splice plate set stand ls Err:509 Err:509 -
hanger, mur baut dll.

4 CABLE TRAY
u/ Kabel Electronic

4.1 Straight cable tray


Ukuran 750 mm m Err:509 Err:509 -
4.2 Fitting-fitting : lot Err:509 Err:509
4.3 Accessories : Err:509 Err:509
Joint set, horizontal/vertical fishplate, splice plate set stand ls Err:509 Err:509 -
hanger, mur baut dll.

5 INSTALASI PENERANGAN DAN


STOP KONTAK 16A/250V
Pengadaan dan pengadaan semua peralatan
instalasi sesuai spesifikasi

5.1 Instalasi penerangan, kabel NYA 2x2,5 mm2,


dalam HIP Conduit dia. 20 mm ttk Err:509 Err:509 -
(Black, Blue & Yellow Green )
5.2 Instalasi kotak-kontak, kabel NYA 2x2,5 mm2,
dalam HIP Conduit dia. 20 mm ttk Err:509 Err:509 -
(Black, Blue & Yellow Green )
5.3 Instalasi titik Exhaust Fan, kabel NYA 2X2,5 mm2
HIP Conduit dia. 20 mm ttk Err:509 Err:509 -
(Black, Blue & Yellow Green )
5.4 Stop kontak 16A/250V bh Err:509 Err:509 -
5.5 Sakelar ganda 6A/250V 4 Gang bh Err:509 Err:509 -
5.6 Sakelar tunggal 6A/250V bh Err:509 Err:509 -

6 ARMATURE
6.1 - DL PLE-U 20 Watt (4") bh Err:509 Err:509 -
6.2 - RMI TBS-300 1x18 Watt bh Err:509 Err:509 -
6.3 - TLD-TKO 1x18 Watt bh Err:509 Err:509 -
6.4 - Roset SL-E 13 Watt bh Err:509 Err:509 -
6.5 - Exit Lamp TL 10 Watt bh Err:509 Err:509 -
` SUB TOTAL IV.F.1 -

F.2 GOUNDING SYSTEM

1 GOUNDING ELECTRIC
Max. resistance 2 ohm

- Pengeboran tanah dia. 2" kedalaman 12 meter ttk Err:509 Err:509 -


- Titik grounding, menggunakan BC 70 mm2 dan
elektroda dia. 1" lengkap dengan pipa GIP
dia. 1,25" klas medium pada kedalaman 12 m. set Err:509 Err:509 -
- Bak kontrol lengkap dengan penutup sesuai gambar bh Err:509 Err:509 -
rencana.
- Accessories : Kabel schoon, BC Connector, Mur baut dll. lot Err:509 Err:509 -

2 GOUNDING PENANGKAP PETIR


Max. resistance 2 ohm

- Pengeboran tanah dia. 2" kedalaman 12 meter ttk Err:509 Err:509 -


- Titik grounding, menggunakan BC 70 mm2 dan
elektroda dia. 1" lengkap dengan pipa GIP
dia. 1,25" klas medium pada kedalaman 12 m. set Err:509 Err:509 -
- Bak kontrol lengkap dengan penutup sesuai gambar bh Err:509 Err:509 -
rencana.
- Accessories : Kabel schoon, BC Connector, Mur baut dll. lot Err:509 Err:509 -

3 GOUNDING ELECTRONIC
Max. resistance 1 ohm

- Pengeboran tanah dia. 2" kedalaman 12 meter ttk Err:509 Err:509 -


- Titik grounding, menggunakan BC 35 mm2 dan
elektroda dia. 1" lengkap dengan pipa GIP
dia. 1,25" klas medium pada kedalaman 12 m. set Err:509 Err:509 -
- Bak kontrol lengkap dengan penutup sesuai gambar bh Err:509 Err:509 -
rencana.
- Accessories : Kabel schoon, BC Connector, Mur baut dll. lot Err:509 Err:509 -

` SUB TOTAL IV. F.2 -

F.3 LANTAI 2
1 PANEL DISTRIBUSI
Sesuai gambar dan spesifikasi teknis.
terbuat dari plat baja, tebal 2 mm diproses anti karat dan
di cat bakar.
Type : Wall Mounted cubicle.
Dimensi : sesuai shop drawing supplier/pabrik.

1.1 Panel PP-L.2 unit Err:509 Err:509 -


1.2 Panel PP-VAC L.2 unit Err:509 Err:509 -

2 CABLE LADDER
u/ Kabel Tegangan Rendah

2.1 Straight ladder


Ukuran 200 mm m Err:509 Err:509 -
2.2 Fitting-fitting : lot Err:509 Err:509 -
2.3 Accessories :
Joint set, horizontal/vertical fishplate, splice plate set stand ls Err:509 Err:509 -
hanger, mur baut dll.

3 CABLE TRAY
u/ Kabel Electronic

3.1 Straight cable tray


Ukuran 200 mm m Err:509 Err:509 -
3.2 Fitting-fitting : lot Err:509 Err:509 -
3.3 Accessories :
Joint set, horizontal/vertical fishplate, splice plate set stand ls Err:509 Err:509 -
hanger, mur baut dll.

4 INSTALASI PENERANGAN DAN


STOP KONTAK
Pengadaan dan pengadaan semua peralatan
instalasi sesuai spesifikasi

4.1 Instalasi penerangan, kabel NYM 3x2,5 mm2,


dalam HIP Conduit dia. 20 mm ttk Err:509 Err:509 -
4.2 Instalasi stop kontak kontak, kabel NYM 3x2,5 mm2,
dalam HIP Conduit dia. 20 mm ttk Err:509 Err:509 -
4.3 Instalasi titik Exhaust Fan, kabel NYM 3X2,5 mm2
HIP Conduit dia. 20 mm ttk Err:509 Err:509 -
4.4 Stop kontak 16A/250V bh Err:509 Err:509 -
4.5 Sakelar ganda 6A/250V 4 Gang bh Err:509 Err:509 -
4.6 Sakelar tunggal 6A/250V bh Err:509 Err:509 -

5 ARMATURE
- DL PLE-U 20 Watt (4") bh Err:509 Err:509 -
- RMI TBS-300 1x18 Watt bh Err:509 Err:509 -
- TLD-TKO 1x18 Watt bh Err:509 Err:509
- Roset SL-E 13 Watt bh Err:509 Err:509 -
- Exit Lamp TL 10 Watt bh Err:509 Err:509 -

` SUB TOTAL IV. F.3 -

F.4 LANTAI 3
1 PANEL DISTRIBUSI
Sesuai gambar dan spesifikasi teknis.
terbuat dari plat baja, tebal 2 mm diproses anti karat dan
di cat bakar.
Type : Wall Mounted cubicle.
Dimensi : sesuai shop drawing supplier/pabrik.

1.1 Panel PP-L.3 unit Err:509 Err:509 -


1.2 Panel PP-VAC L.3 unit Err:509 Err:509 -

2 CABLE LADDER
u/ Kabel Tegangan Rendah

2.1 Straight ladder


Ukuran 200 mm m Err:509 Err:509 -
2.2 Fitting-fitting : lot Err:509 Err:509 -
2.3 Accessories :
Joint set, horizontal/vertical fishplate, splice plate set stand ls Err:509 Err:509 -
hanger, mur baut dll.

3 CABLE TRAY
u/ Kabel Electronic

3.1 Straight cable tray


Ukuran 200 mm m Err:509 Err:509 -
3.2 Fitting-fitting : lot Err:509 Err:509 -
3.3 Accessories :
Joint set, horizontal/vertical fishplate, splice plate set stand ls Err:509 Err:509 -
hanger, mur baut dll.

4 INSTALASI PENERANGAN DAN


STOP KONTAK
Pengadaan dan pengadaan semua peralatan
instalasi sesuai spesifikasi

4.1 Instalasi penerangan, kabel NYM 3x2,5 mm2,


dalam HIP Conduit dia. 20 mm ttk Err:509 Err:509 -
4.2 Instalasi stop kontak kontak, kabel NYM 3x2,5 mm2,
dalam HIP Conduit dia. 20 mm ttk Err:509 Err:509 -
4.3 Instalasi titik Exhaust Fan, kabel NYM 3X2,5 mm2
HIP Conduit dia. 20 mm ttk Err:509 Err:509 -
4.4 Kotak-kontak 16A/250V bh Err:509 Err:509 -
4.5 Sakelar ganda 6A/250V 4 Gang bh Err:509 Err:509 -
4.6 Sakelar tunggal 6A/250V bh Err:509 Err:509 -

5 ARMATURE
- DL PLE-U 20 Watt (4") bh Err:509 Err:509 -
- RMI TBS-300 1x18 Watt bh Err:509 Err:509 -
- TLD-TKO 1x18 Watt bh Err:509 Err:509 -
- Roset SL-E 13 Watt bh Err:509 Err:509 -
- Exit Lamp TL 10 Watt bh Err:509 Err:509 -

` SUB TOTAL IV. F.4 -

F. 5 LANTAI ATAP
1 PANEL DISTRIBUSI
Sesuai gambar dan spesifikasi teknis.
terbuat dari plat baja, tebal 2 mm diproses anti karat dan
di cat bakar.
Type : Wall Mounted cubicle.
Dimensi : sesuai shop drawing supplier/pabrik.

1.1. Panel PP-L.ATAP unit Err:509 Err:509 -


1.2. Panel PP-VAC L. ATAP unit Err:509 Err:509 -

2 CABLE LADDER
u/ Kabel Tegangan Rendah

2.1. Straight ladder


Ukuran 200 mm m Err:509 Err:509 -
2.2. Fitting-fitting : lot Err:509 Err:509 -
2.3. Accessories : Err:509
Joint set, horizontal/vertical fishplate, splice plate set stand ls Err:509 Err:509 -
hanger, mur baut dll.

3 CABLE TRAY
u/ Kabel Electronic

3.1. Straight cable tray


Ukuran 200 mm m Err:509 Err:509 -
3.2. Fitting-fitting : lot Err:509 Err:509 -
3.3. Accessories :
Joint set, horizontal/vertical fishplate, splice plate set stand ls Err:509 Err:509 -
hanger, mur baut dll.

4 INSTALASI PENERANGAN DAN


STOP KONTAK
Pengadaan dan pengadaan semua peralatan
instalasi sesuai spesifikasi

4.1. Instalasi penerangan, kabel NYM 3x2,5 mm2,


dalam HIP Conduit dia. 20 mm ttk Err:509 Err:509 -
4.2. Instalasi stop kontak, kabel NYM 3x2,5 mm2,
dalam HIP Conduit dia. 20 mm ttk Err:509 Err:509 -
4.3. Instalasi titik Exhaust Fan, kabel NYM 3X2,5 mm2
HIP Conduit dia. 20 mm ttk Err:509 Err:509 -
4.4. Stop kontak 16A/250V bh Err:509 Err:509 -
4.5. Sakelar ganda 6A/250V 4 Gang bh Err:509 Err:509 -
4.6. Sakelar tunggal 6A/250V

5 ARMATURE
- Exit Lamp TL 10 Watt bh Err:509 Err:509 -
` SUB TOTAL IV. F.5 -

F.6 PEKERJAAN PERALATAN UTAMA


Pengadaan dan pemasangan peralatan utama termasuk tiang,
dudukan /pondasi dll., sesuai gambar dan spesifikasi teknis:

1. Penangkap petir set Err:509 Err:509 -


Komponen sesuai spesifikasi teknis meliputi :
Grounded Blunt Lighting rod, Air Gap, Four electrically
Flooting Panel, Lighting Strike Recorder
- Radius perlindungan : Minimal 60 meter.
- Ketinggian : 6 meter dari titik tertinggi bangunan.
- Accessories : Obstruction lamp.

2. Tiang penangkap petir


Pipa GIP medium klas :
- dia. 4" m Err:509 Err:509 -
- dia. 3" m Err:509 Err:509 -
- dia. 2" m Err:509 Err:509 -
- dia. 1" m Err:509 Err:509 -
- Plate besi tebal 10 mm ukuran 40 x 40 cm bh Err:509 Err:509 -
- Plate besi tebal 10 mm ukuran 20 x 20 cm bh Err:509 Err:509 -
- Kabel sling 50 mm2 m Err:509 Err:509 -
- Span skrup dia, 1/2" bh Err:509 Err:509 -
- Fitting-fitting & accessories : lot Err:509 Err:509 -

3. Grounding pentanahan kedalaman 12 meter, lkp dengan ttk Err:509 Err:509 -


Pelindung BC GIP medium klas dia. 1 1/4", BC connector,
kabel BC dll.

4 Instalasi kabel penghantar


Kabel High Voltage Shealded Cable (HVSC 95 mm2) m Err:509 Err:509 -
` SUB TOTAL IV. F.6 -

F.7 PEKERJAAN KABEL TRAY


Kabel Tray
Pekerjaan dan pemasangan termasuk klem, penyangga,
penggantung dan alat bantu.

1 Lantai 1 (Satu)
Elektrikal + Asesoris uk. 300 x 100 x 2400 x 1.2 mm m Err:509 Err:509 -
Elektronik+ Asesoris uk. 300 x 100 x 2400 x 1.2 mm m Err:509 Err:509 -

2 Lantai 2 (Dua)
Elektrikal + Asesoris uk. 300 x 100 x 2400 x 1.2 mm m Err:509 Err:509 -
Elektronik+ Asesoris uk. 300 x 100 x 2400 x 1.2 mm m Err:509 Err:509 -

3 Lantai 3
Elektrikal + Asesoris uk. 300 x 100 x 2400 x 1.2 mm m Err:509 Err:509 -
Elektronik+ Asesoris uk. 300 x 100 x 2400 x 1.2 mm m Err:509 Err:509 -

` SUB TOTAL IV. F.7 -


` SUB TOTAL IV. F -

G PEKERJAAN FIRE ALARM

G.1 LANTAI 1

1 PERALATAN UTAMA
1.1 Master Control Fire Alarm ( MCP-FA ) unit Err:509 Err:509 -
Type : Wall Mounted
Kapasitas : 60 Zone.
Include : 2 loop …. addressable. Lkp dengan peralatan
Rectifier dan Battery Charger, Surge arrester,
Fireman intercom, 2 handset etc., Incl. control
module utility.

1.2 LCD Display (Lok. Control Room) unit Err:509 Err:509 -


Type : Wall Mounted, 80 Character terminal mode only
LCD Annunciator w/Annunciator Flush box

1.3 UPS unit Err:509 Err:509 -

1.4 Operatore Consule unit Err:509 Err:509 -

1.5 Main JBFA unit Err:509 Err:509 -

1.6 Rak Peralatan (provisional) unit Err:509 Err:509 -

2 Kabel Feeder
- Kabel NYA 2x1,5 mm2, dalam HIP conduite dia. 20 mm
dari MCFA s/d JB-atap u/ power control module m Err:509 Err:509 -

- Kabel NYA 2x1,5 mm2, dalam HIP conduite dia. 20 mm


dari MCFA s/d JB-ATAP u/ power zone module m Err:509 Err:509 -

- Kabel Loop / twisted shielded AWG 16 (1pair), dalam HIP


Conduit dia. 20 mm, dari MCFA s/d JB-ATAP, dan dari JB-ATAP s/d
MCFA m Err:509 Err:509 -

3 INSTALASI
3.1. Junction Box- Fire Alarm ( JB-FA ) unit Err:509 Err:509 -
terbuat dari plat baja, tebal 1,5 mm diproses anti
karat dan di cat bakar,lengkap dengan
terminal box dan peralatan bantu lainnya
Kapasitas : 10 pair

3.2. Instalasi titik Detector, kabel NYA 2x1,5 mm2, dalam HIP
Conduit dia. 20 mm ttk Err:509 Err:509 -

3.3. Instalasi titik Alarm ke Lift, Pompa Kebakaran, FRC Cable


2x1,5 mm2, dalam metal conduit dia. 20 mm ttk Err:509 Err:509 -

3.4. Instalasi titik Flow Switch, kabel NYA 2x1,5 mm2, dalam HIP
conduit dia 20 mm. ttk Err:509 Err:509 -

3.5. Instalasi titik Manual Station, kabel NYA 2x1,5 mm2, dalam HIP
conduit dia. 20 mm ttk Err:509 Err:509 -

3.6. Instalasi titik Alarm Bell dan alarm lamp, kabel NYA 2x1,5 mm2,
dalam metal conduit dia. 20 mm ttk Err:509 Err:509 -

4 DETECTOR
4.1. Photo Electric Smoke Detector & Base Pcs Err:509 Err:509 -
4.2. Fixed Heat detector Pcs Err:509 -
4.3. ROR Heat detector Pcs Err:509 Err:509 -
4.4. Breakglass Call Point Pcs Err:509 Err:509 -
4.5. Alarm Bell, 6 Inch, 24 Volt. Pcs Err:509 Err:509 -
4.6. Strobe, 24 Volt, Red. Pcs Err:509 Err:509 -
4.7. Addressable Mini Module (for Breakglass) Pcs Err:509 Err:509 -
4.8. Addressable Controle Module (for Bell/Indicator lamp) Pcs Err:509 Err:509 -
4.9. Addressable Zone Module (for zone module) Pcs Err:509 Err:509 -
` SUB TOTAL IV. G.1 -

G.2 LANTAI 2
1 INSTALASI
1.1. Junction Box- Fire Alarm ( JB-FA ) unit Err:509 Err:509 -
terbuat dari plat baja, tebal 1,5 mm diproses anti
karat dan di cat bakar,lengkap dengan
terminal box dan peralatan bantu lainnya
Kapasitas : 10 pair

1.2. Instalasi titik Detector, kabel NYA 2x1,5 mm2, dalam HIP
Conduit dia. 20 mm ttk Err:509 Err:509 -

1.3. Instalasi titik Flow Switch, kabel NYA 2x1,5 mm2, dalam HIP
conduit dia 20 mm. ttk Err:509 Err:509 -

1.4. Instalasi titik Manual Station, kabel NYA 2x1,5 mm2, dalam HIP
conduit dia. 20 mm ttk Err:509 Err:509 -

1.5. Instalasi titik Alarm Bell dan alarm lamp, kabel NYA 2x1,5 mm2,
dalam metal conduit dia. 20 mm ttk Err:509 Err:509 -

2 DETECTOR
2.1. Photo Electric Smoke Detector & Base Pcs Err:509 Err:509 -
2.2. ROR Heat detector Pcs Err:509 Err:509 -
2.3. Breakglass Call Point Pcs Err:509 Err:509 -
2.4. Alarm Bell, 6 Inch, 24 Volt. Pcs Err:509 Err:509 -
2.5. Strobe, 24 Volt, Red. Pcs Err:509 Err:509 -
2.6. Addressable Mini Module (for Breakglass) Pcs Err:509 Err:509 -
2.7. Addressable Controle Module (for Bell/Indicator lamp) Pcs Err:509 Err:509 -
2.8. Addressable Zone Module (for zone module) Pcs Err:509 Err:509 -

` SUB TOTAL IV. G.2 -

G.3 LANTAI 3
1 INSTALASI
1.1. Junction Box- Fire Alarm ( JB-FA ) unit Err:509 Err:509 -
terbuat dari plat baja, tebal 1,5 mm diproses anti
karat dan di cat bakar,lengkap dengan
terminal box dan peralatan bantu lainnya
Kapasitas : 10 pair

1.2. Instalasi titik Detector, kabel NYA 2x1,5 mm2, dalam HIP
Conduit dia. 20 mm ttk Err:509 Err:509 -

1.3. Instalasi titik Flow Switch, kabel NYA 2x1,5 mm2, dalam HIP
conduit dia 20 mm. ttk Err:509 Err:509 -

1.4. Instalasi titik Manual Station, kabel NYA 2x1,5 mm2, dalam HIP
conduit dia. 20 mm ttk Err:509 Err:509 -

1.5. Instalasi titik Alarm Bell dan alarm lamp, kabel NYA 2x1,5 mm2,
dalam metal conduit dia. 20 mm ttk Err:509 Err:509 -

2 DETECTOR
2.1. Photo Electric Smoke Detector & Base Pcs Err:509 Err:509 -
2.2. ROR Heat detector Pcs Err:509 Err:509 -
2.3. Breakglass Call Point Pcs Err:509 Err:509 -
2.4. Alarm Bell, 6 Inch, 24 Volt. Pcs Err:509 Err:509 -
2.5. Strobe, 24 Volt, Red. Pcs Err:509 Err:509 -
2.6. Addressable Mini Module (for Breakglass) Pcs Err:509 Err:509 -
2.7. Addressable Controle Module (for Bell/Indicator lamp) Pcs Err:509 Err:509 -
2.8. Addressable Zone Module (for zone module) Pcs Err:509 Err:509 -

` SUB TOTAL IV. G.3 -

G.4 RUANG MESIN LIFT

1 INSTALASI
1.2. Instalasi titik Detector, kabel NYA 2x1,5 mm2, dalam HIP
Conduit dia. 20 mm ttk Err:509 Err:509 -

2 DETECTOR
2.1. Fixed Heat detector Pcs Err:509 Err:509 -

` SUB TOTAL IV. G.4 -


` SUB TOTAL IV. G -

H PEKERJAAN TELEPHONE
H.1 PERALATAN UTAMA
Ruang Kontrol Elektronik Lantai 1
1 MDF-TP 2 x 300" unit 1.00 Err:509 -
2 PABX 200 Ext, 20 Ptt unit 1.00 Err:509 -
3 Box Telkom 100" unit 1.00 Err:509 -
4 PC untuk Billing System c/w Outlet RS 232 unit 1.00 Err:509 -
5 Printer unit 1.00 Err:509 -
6 UPS unit 1.00 Err:509 -
7 Rak Peralatan (Provisional) unit 1.00 Err:509 -

H.2 TERMINAL BOX


Terminal Box c/w assesories sesuai gambar dan spesifikasi
1 JBTP-Lt1.10Pair bh 1.00 Err:509 -
2 JBTP-Lt2.10Pair bh 1.00 Err:509 -
3 JBTP-Lt3.10Pair bh 1.00 Err:509 -

H.2 OUTLET TELEPHONE


Telephone Extension
1 Lantai 1 bh 9.00 Err:509 -
2 Lantai 2 bh 7.00 Err:509 -
3 Lantai 3 bh 7.00 Err:509 -

Telephone Extansion (Operator Console)


1 Lantai 1 bh 1.00 Err:509 -

Telephone Extension Wall


1 Lantai 2 bh 1.00 Err:509 -
2 Lantai 3 bh 1.00 Err:509 -

Telephone Direct
1 Lantai 1 bh 1.00 Err:509 -
2 Lantai 2 bh 1.00 Err:509 -
3 Lantai 3 bh 1.00 Err:509 -

H.3 KABEL INSTALASI


A Pengkabelan untuk semua peralatan utama pada ruang kontrol lot Err:509 Err:509 -

B Grounding sistem untuk semua peralatan utama pada ruang kontrol lot 1.00 Err:509 -

C Kabel TIITC 100 x 2 x 0,6 mm²+ PVC Conduit ø ¾" dari BOX telkom ke MDF-TP (provisional) m 80.00 Err:509 -

D Kabel TITC 20 x 2 x 0,6 mm²+ PVC Conduit ø ¾" dari MDF-TP ke JBTP-Lt 1 m 42.00 Err:509 -

E Kabel TITC 20 x 2 x 0,6 mm²+ PVC Conduit ø ¾" dari MDF-TP ke JBTP-Lt.2 m 38.00 Err:509 -

F Kabel TITC 30 x 2 x 0,6 mm²+ PVC Conduit ø ¾" dari MDF-TP ke JBTP-Lt.3 m 42.00 Err:509 -

` SUB TOTAL IV. H -

I PEKERJAAN CCTV

I.1 LANTAI 1
1 PEKERJAAN PERALATAN UTAMA
Pengadaan dan pemasangan peralatan utama R. Security.
lkp dengan kabel power, kabel kontrol dll. Sesuai gambar
dan spesifikasi teknis.

1.1. Personal Computer 22" unit 1.00 Err:509 -


1.2. Video Software Manager unit 1.00 Err:509 -
1.3. Digital Disk Recorder unit 1.00 Err:509 -
1.4. Colour Monitor 22" unit 1.00 Err:509 -

1 INSTALASI TITIK CAMERA


Pengadaan dan pemasangan semua peralatan instalasi, sesuai
gambar dan spesifikasi teknis .

1.1. Instalasi kabel power titik Camera, ttk 8.00 Err:509 -


kabel NYMHY 2x1,5 mm2, dalam HIP Conduite dia. 20 mm

1.2. Instalasi titik Colour Camera Fix Indoor WP-CP240, ttk 2.00 Err:509 -
Kabel 5C-2V, dalam HIP Conduite dia. 20 mm

1.3. Instalasi titik Colour Camera Fix Indoor Dome Compact ttk 6.00 Err:509 -
WV-CV 301/302, Kabel 5C-2V dalam HIP Conduite dia. 20 mm

2 COLOUR CAMERA
Pengadaan dan pemasangan peralatan, lengkap dengan
Support, Hanger dll. Sesuai gambar dan spesifikasi teknis .

2.1. Colour Camera Fix Indoor WP-CP240. bh 2.00 Err:509 -


2.2. Colour Camera Fix Indoor Dome Compact WV-CV 301/302 bh 6.00 Err:509 -

` SUB TOTAL IV. I.1 -

I.2 LANTAI 2
1 INSTALASI TITIK CAMERA
Pengadaan dan pemasangan semua peralatan instalasi, sesuai
gambar dan spesifikasi teknis .

1.1. Instalasi kabel power titik Camera, ttk 8.00 Err:509 -


kabel NYMHY 2x1,5 mm2, dalam HIP Conduite dia. 20 mm

1.2. Instalasi titik Colour Camera Fix Indoor WP-CP240, ttk 2.00 Err:509 -
Kabel 5C-2V, dalam HIP Conduite dia. 20 mm

1.3. Instalasi titik Colour Camera Fix Indoor Dome Compact ttk 6.00 Err:509 -
WV-CV 301/302, Kabel 5C-2V dalam HIP Conduite dia. 20 mm

2 COLOUR CAMERA
Pengadaan dan pemasangan peralatan, lengkap dengan
Support, Hanger dll. Sesuai gambar dan spesifikasi teknis .

2.1. Colour Camera Fix Indoor WP-CP240. bh 2.00 Err:509 -


2.2. Colour Camera Fix Indoor Dome Compact WV-CV 301/302 bh 6.00 Err:509 -

` SUB TOTAL IV. I.2 -

I.3 LANTAI 3
1 INSTALASI TITIK CAMERA
Pengadaan dan pemasangan semua peralatan instalasi, sesuai
gambar dan spesifikasi teknis .

1.1. Instalasi kabel power titik Camera, ttk 8.00 Err:509 -


kabel NYMHY 2x1,5 mm2, dalam HIP Conduite dia. 20 mm

1.2. Instalasi titik Colour Camera Fix Indoor WP-CP240, ttk 2.00 Err:509 -
Kabel 5C-2V, dalam HIP Conduite dia. 20 mm

1.3. Instalasi titik Colour Camera Fix Indoor Dome Compact ttk 6.00 Err:509 -
WV-CV 301/302, Kabel 5C-2V dalam HIP Conduite dia. 20 mm

2 COLOUR CAMERA
Pengadaan dan pemasangan peralatan, lengkap dengan
Support, Hanger dll. Sesuai gambar dan spesifikasi teknis .

2.1. Colour Camera Fix Indoor WP-CP240. bh 2.00 Err:509 -


2.2. Colour Camera Fix Indoor Dome Compact WV-CV 301/302 bh 6.00 Err:509 -

` SUB TOTAL IV. I.3 -


` SUB TOTAL IV. I -

J PEKERJAAN MATV

PERALATAN UTAMA
di Ruang Sekuriti Lantai 1
1 Power Supply (PSU) Corsair CX Series 600W – Bronze unit Err:509 Err:509 -
2 Modulator unit Err:509 Err:509 -
3 Single Channel Amplifier (SCA) unit Err:509 Err:509 -
4 Power Devider (PD) unit Err:509 Err:509 -
5 Combiner (C) unit Err:509 Err:509 -
6 Digital Receiver (RD) unit Err:509 Err:509 -
7 TV Set unit Err:509 Err:509 -
8 VCD / DVD LD Player unit Err:509 Err:509 -
9 Antena UHF unit Err:509 Err:509 -
10 Antena VHF unit Err:509 Err:509 -
11 Parabola Antenna Premium Dia 80 cm (Fixed) c/w tiang unit Err:509 Err:509 -
12 Asiasat - 3S Dia 12 FT c/w Dual LNB Fixed unit Err:509 Err:509 -
Rak peralatan

FIXTURE
JBTV
1 Lantai 1 bh Err:509 Err:509 -
2 Lantai 2 bh Err:509 Err:509 -
3 Lantai 3 bh Err:509 Err:509 -

Splitter 2 Way
1 Lantai 1 bh Err:509 Err:509 -
2 Lantai 2 bh Err:509 Err:509 -
3 Lantai 3 bh Err:509 Err:509 -

Splitter 4 Way
1 Lantai 1 bh Err:509 Err:509 -
2 Lantai 2 bh Err:509 Err:509 -
3 Lantai 3 bh 1.00 Err:509 -

Coupler 4 Way
1 Lantai 1 bh Err:509 Err:509 -
2 Lantai 2 bh Err:509 Err:509 -
3 Lantai 3 bh Err:509 Err:509 -

Coupler 2 Way
1 Lantai 1 bh Err:509 Err:509 -
2 Lantai 2 bh Err:509 Err:509 -
3 Lantai 3 bh Err:509 Err:509 -

TV Outlet
1 Lantai 1 bh Err:509 Err:509 -
2 Lantai 2 bh Err:509 Err:509 -
3 Lantai 3 bh Err:509 Err:509 -

End Of Line (EOL)


1 Lantai 1 bh Err:509 Err:509 -
2 Lantai 2 bh Err:509 Err:509 -
3 Lantai 3 bh Err:509 Err:509 -

Booster
1 Lantai 1 bh Err:509 Err:509 -
2 Lantai 3 bh Err:509 Err:509 -
3 Lantai 3 bh Err:509 Err:509 -

` SUB TOTAL IV. J -

K PEKERJAAN DATA
PERALATAN UTAMA
1 at Ruang Server Lt.1
Main Patch Panel 19'' Rack 45 u c/w Fan 6 Unit, 9x Wire Managemant, 2x Firewall, Set Err:509 Err:509 -
Server Internet, Monitor, Keyboard, IP Controller Managemant, Antivirus, Intrution
Prevention System (IPS), 2x Core Switch c/w Redundant Processor &
Powdere Suply + 2x12 Port 1000 BAse SX Module & 48 Port 10/100/1000 Base T

2 Server Type 19" Rack unit Err:509 Err:509 -


Internet, Router By ISP, Remote Side, Router BY Provider, Server Remote c/w Antivirus set Err:509 Err:509 -

3 UPS unit Err:509 Err:509 -

4 RACK SWITCH & PATCH PANEL


Rack 19" 12U Wall Type c/w Fan 4 Unit,3x Patch Panel Data 24 Port, Unit Err:509 Err:509 -
3x Acces Switch 24 Port, 3x Wire management at LantaI 1

5 Rack 19" 12U Wall Type c/w Fan 4 Unit,3x Patch Panel Data 24Port, unit Err:509 Err:509 -
3x Acces Switch 24 Port, 3x Wire management di Lantai 2

6 Rack 19" 12U Wall Type c/w Fan 4 Unit,3x Patch Panel Data 24Port, unit Err:509 Err:509 -
3x Acces Switch 24 Port, 3x Wire management di Lantai 3

7 OUTLET DATA
Outlet Data
Lantai 1 bh Err:509 Err:509 -
Lantai 2 bh Err:509 Err:509 -
Lantai 3 bh Err:509 Err:509 -

8 Acces Point
Lantai 1 bh Err:509 Err:509 -
Lantai 2 bh Err:509 Err:509 -
Lantai 3 bh Err:509 Err:509 -

9 KABEL INSTALASI
Pengkabelan untuk semua peralatan utama pada ruang kontrol m Err:509 Err:509 -

Grounding sistem untuk semua peralatan utama pada ruang kontrol m Err:509 Err:509 -

2x(UTP Cat 6,4 Pairs) dari Main Patch Panel ke Patch panel Lt.1 m Err:509 Err:509 -

2x(UTP Cat 6,4 Pairs) dari Main Patch Panel ke Patch panel Lt.2 m Err:509 Err:509 -

10 Kabel UTP CAT 6 , 4 Pairs + PVC Conduit untuk instalasi


Outlet Data
Lantai 1 ttk Err:509 Err:509 -
Lantai 2 ttk Err:509 Err:509 -
Lantai 3 ttk Err:509 Err:509 -

11 Kabel UTP CAT 6 , 4 Pairs + PVC Conduit untuk instalasi


Acces Point
Lantai 1 ttk Err:509 Err:509 -
Lantai 2 ttk Err:509 Err:509 -
Lantai 3 ttk Err:509 Err:509 -

` SUB TOTAL IV. K -


L PEKERJAAN TATA SUARA

L.1 Peralatan Utama


Peralatan Utama Central sound system dan car call

1 Central Emergency paging da unit Err:509 Err:509 -


Cabinet rack, Lengkap dengan Rack mounted, Perforated
panel berikut module / komponen sesuai spesifiaksi teknis :

1.1. 1 Set. Auxilliary pre amplifier module unit -


Input sensitivity : -0 dB/-20 dB (switchable)
Impedance : 100 k Ohms (balanced)
Frequency response : 30-20 kHz +/- 1 dB

1.2. 1 Set. Line amplifier module unit -


Output : 0 dBv
Output impedance : 600 ohms, balanced
Frequency response : 30-20000 Hz +/- 1 dB

1.3. 1 Set. Graphic equalizer, type 1 channel 1/3 Octave unit -

1.4. 1 Set. Speaker Selector , type 10 individual speaker selector switch.

1.5. 1 set. Mixer pre amplifier unit -


Output : 240 W RMS, Modulator construction with
multiple programing function and control.

1.6. 1 Set. Power amplifier 240 Watt unit -


Distortion : 1% (at rated output = 1 kHz)
Input : 2 program input parallel.
Output and load impedance : 100V/42 Ohms
70V/21 Ohms
50V/11 Ohms

1.7. 1 Set. AM/FM radio tunner module unit -


Tuning range : AM 520-1611 kHz (9 step)
: FM 87,5-108 kHz (50 step)

1.8. 1 set. Chime module unit -


Signal : 2-note chime or gong (switchable)
Connection : Indication output 5-pint DIN socket

1.10. 1 set. Surge Arrester unit -


1.11. 1 set. ICA UPS on line unit -
1.12. 1 Set. IDF 10 pair unit -

1.13. 1 Set. Paging microphone, type Remote microphone with 2 unit -


tone Chime & Pre amplifier

1.14. 1 Set. Back ground mudic microphone, type Hand hold with unit -
swivel mount adaptor (dynamic microphone) c/w
connecting cable with 5-pint DIN socket

1.15. 1 Set. Cassete deck tape recorder / CD room player, unit -


type reverse.

I.2 Kabel Feeder


2.1. IDF ke JB-PG L.ATAP
NYMHY 2x1,5 mm2, dalam HIP Conduit dia. 20mm Err:509 Err:509 Err:509
2.3. IDF ke JB-PG L.3
NYMHY 2x1,5 mm2, dalam HIP Conduit dia. 20mm Err:509 Err:509 Err:509
2.4. IDF ke JB-PG L.2
NYMHY 2x1,5 mm2, dalam HIP Conduit dia. 20mm Err:509 Err:509 Err:509
2.5. IDF ke JB-PG L.1
NYMHY 2x1,5 mm2, dalam HIP Conduit dia. 20mm Err:509 Err:509 Err:509

I.3 LANTAI 1
1 Wall mounting box speaker 6 watt bh Err:509 Err:509 -
2 Ceilling speaker 6 watt bh Err:509 Err:509 -
3 Column speaker 6 watt bh Err:509 Err:509 -
4 Volume control bh Err:509 Err:509 -
5 Junction Box Car Calll/JB-PG 10 pair unit Err:509 Err:509 -
6 Instalasi titik speaker kabel NYMHY 2x1,5 mm2 ttk Err:509 Err:509 -

I.4 LANTAI 2
1 Wall mounting box speaker 6 watt bh Err:509 Err:509 -
2 Ceilling speaker 6 watt bh Err:509 Err:509 -
3 Column speaker 6 watt bh Err:509 Err:509 -
4 Volume control bh Err:509 Err:509 -
5 Junction Box Pagingl/JB-PG 10 pair unit Err:509 Err:509 -
6 Instalasi titik speaker kabel NYMHY 2x1,5 mm2 ttk Err:509 Err:509 -

I.5 LANTAI 3
1 Ceilling speaker 6 watt bh Err:509 Err:509 -
2 Wall mounting box speaker 6 watt bh Err:509 Err:509 -
3 Column speaker 6 watt bh Err:509 Err:509 -
4 Volume control bh Err:509 Err:509 -
5 Junction Box Pagingl/JB-PG 10 pair unit Err:509 Err:509 -
6 Instalasi titik speaker kabel NYMHY 2x1,5 mm2 ttk Err:509 Err:509 -

` SUB TOTAL IV. L -

M PEKERJAAN NURSE CALL


LANTAI II
Master Station 20 call bh 1.00 Err:509 -
Bed side call button bh 12.00 Err:509 -
Wall jack with mic near 8 bh 12.00 Err:509 -
Ceiling speaker bh 6.00 Err:509 -
Corridor light multi beds bh 6.00 Err:509 -
Call reset button bh 6.00 Err:509 -

LANTAI III
Master Station 20 call bh 1.00 - -
Bed side call button bh 12.00 - -
Wall jack with mic near 8 bh 12.00 - -
Ceiling speaker bh 6.00 - -
Corridor light multi beds bh 6.00 - -
Call reset button bh 6.00 - -
Testing, commisioning Err:509

` SUB TOTAL IV. M -

N PEKERJAAN VAC

N.1 OUTDOR LT 1, 2 & 3


1 VRV A Series : RXQ20AMY14 unit 2.00 Err:509 -
2 VRV A Series : RXQ26AMY14 unit 1.00 Err:509 -
3 VRV IV-S : RXMQ4AVE4 unit 1.00 Err:509 -

N.2 INDOR LT 1, 2 & 3


1 Wall Mounted + Wired Navigation Controller : FXAQ20PVE4 + BRC1E63 unit 11.00 Err:509 -
2 Wall Mounted + Wired Navigation Controller: FXAQ25PVE4 + BRC1E63 unit 7.00 Err:509 -
3 Wall Mounted + Wired Navigation Controller: FXAQ32PVE4 + BRC1E63 unit 2.00 Err:509 -
4 Cassette (Round Flow) + Wired Navigation Controller: FXFQ125AV4 + BRC1E63 unit 4.00 Err:509 -
5 Cassette (Round Flow) + Wired Navigation Controller: FXFQ50AV4 + BRC1E63 unit 8.00 Err:509 -
6 Cassette (Round Flow) + Wired Navigation Controller: FXFQ63AV4 + BRC1E63 unit 6.00 Err:509 -
7 Ceiling Suspended + Wired Navigation Controller: FXHQ100MAV7 + BRC1E63 unit 1.00 Err:509 -

N.3 ACCESSORIES
1 REFNET Joint KHRP26A22T-S unit 21.00 Err:509 -
2 REFNET Joint KHRP26A33T-S unit 10.00 Err:509 -
3 REFNET Joint KHRP26A72T-S unit 3.00 Err:509 -
4 REFNET Joint KHRP26A73T-S unit 1.00 Err:509 -
5 Pipe Size Reducer KHRP26M73TP9 unit 1.00 Err:509 -
unit
N.4 OPTIONAL CENTRAL REMOTE CONTROL -
1 Intelligent Touch Manager (iTM) : DCM601A51 unit 1.00 Err:509 -

N.5 Refrigrant, duct, cabeling Installation


Refrigrant pipe ASTM B280 include isolation 1"
1 Ø 1/4" m 136.88 Err:509 -
2 Ø 3/8" m 215.13 Err:509 -
3 Ø 1/2" m 154.75 Err:509 -
4 Ø 5/8" m 188.63 Err:509 -
5 Ø 3/4" m 54.25 Err:509 -
6 Ø 7/8" m 71.75 Err:509 -
7 Ø 1 1/8" m 77.38 Err:509 -
8 Ø 1 3/8" m 40.00 Err:509 -
9 Nitrogen flassing, dan pengelasan lot 1.00 Err:509 -

N.6 Cabeling, Drain & Accessories


1 Pemasangan Refnet Joint, system 1-4 unit 36.00 Err:509 -
2 Pipa drain lengkap dengan isolasi tebal 3/8" set 39.00 Err:509 -
3 Kabel Kontrol Outdoor Indoor & Outdoor + Remote Lokal set 39.00 Err:509 -
4 Kabel Power Indoor NYY 3x25 mm² lot 751.00 Err:509 -
5 Kabel Power Outdoor NYY 4x25 mm² m 200.00 Err:509 -
6 Material Bantu, gantungan Pipa, Dudukan Outdoor Dan Gantungan Indoor lot 39.00 Err:509 -
7 Penambahan refrigrant kg 37.70 Err:509 -
8 Testing Commisioning lot 1.00 Err:509 -

` SUB TOTAL IV. N -

O PEKERJAAN PLUMBING

O.1 PEKERJAAN PERALATAN UTAMA


Pengadaan dan pemasangan peralatan utama termasuk
Base plate, Coupling base, Vibration isolator dll.

1 POMPA TRANSFER CLEAN WATER unit Err:509 Err:509 -


Kapasitas : 235 Liter/menit
Total head : 55 Meter
Jenis : Centryfugal end suction
Power consumtions : 4,6 KW/220-380V/3P/50Hz.
Speed : 1.450/2.900 Rpm.
Casing : Cast iron.
Impeller : Bronze
Shaft : SS 403
Temp. Kerja : 600C
Efficiency min. : 72,1
Control system : Level control & Pressure switch
Opertion : Parallel alternate)

2 POMPA DRAIN SUMP PIT set Err:509 Err:509 -


Kapasitas : 90 Liter/menit
Total head : 20 Meter
Jenis : Submersible sump pump
Power consumtions : 2,2 KW/220-380V/3P/50Hz.

3 POMPA DRAIN GROUND TANK set Err:509 Err:509 -


Kapasitas : 90 Liter/menit
Total head : 20 Meter
Jenis : Submersible sump pump
Power consumtions : 2,2 KW/220-380V/3P/50Hz.

4 POMPA DEEP WELL set Err:509 Err:509 -


Kapasitas : 9 M3/DAY
Total head : 60 Meter
Jenis : Submersible
Power consumtions : 3,3 KW/220-380V/3P/50Hz.
termasuk pengeboran, perapihan, perizinan, test laboratorium, uji kelayakan, mob-demob, pemipaan
lengkap katup-katup, pressure gauge, gravel, panel kontrol+kabel, rumah pompa/bak kontrol, pressure
tank dan asesoris lainnya sesuai gambar dan spesifikasi

5 POMPA FILTER unit Err:509 Err:509 -


Kapasitas : 90 Liter/menit
Total head : 10 Meter
Jenis : Centrifugal (paralel Alternate)
Power consumtions : 2,2 KW/220-380V/3P/50Hz.
Operation : 1 Duty 1 Standby
lengkap vibration mounting, panel kontrol, kabel power & kabel kontrol, pressure tank, material bantu
dan asesoris lainnya sesuai gambar dan spesifikasi

6 SAND FILTER unit Err:509 Err:509 -


Tipe : Catridge Bag Filter Type
Kapasitas : 9 m³/Jam ; 50 Micron
Rata-rata penyaringan :…
Luasan tiap filter :…
Diameter filter :…
Operation : Manual Back Wash
lengkap dudukan, katup-katup dan asesoris lainnya sesuai gambar dan spesifikasi

7 SAND CARBON unit Err:509 Err:509 -


Tipe : Catridge Bag Filter Type
Kapasitas : 9 m³/Jam ; 50 Micron
Rata-rata penyaringan :…
Luasan tiap filter :…
Diameter filter :…
Operation : Manual Back Wash
lengkap dudukan, katup-katup dan asesoris lainnya sesuai gambar dan spesifikasi

8 STP (BIO FILL) unit Err:509 Err:509 -


Kapasitas : 18 m3
Jenis bahan : FRC

` SUB TOTAL IV. O.1 -

O.2 PEKERJAAN PERALATAN PENGATUR


Pengadaan dan pemasangan termasuk klem, penyangga, penggantung dan alat bantu

2.1 PERALATAN PENGATUR PADA POMPA TRANSFER CLEAN WATER


1 PADA SUCTION LINE
- Screen dia. 2,5", Cast iron class K10 bh Err:509 Err:509 -
- Foot Valve dia. 2,5", Cast iron class K10 bh Err:509 Err:509 -
- Flexible conection dia. 2,5", Cast iron class K10 bh Err:509 Err:509 -
- Strainer dia. 2,5", Cast iron class K10 bh Err:509 Err:509 -

2 PADA DISCHARGE LINE


- Check valve dia. 2", Cast iron class K10 bh Err:509 Err:509 -
- Flexible conection dia. 2", Cast iron class K10 bh Err:509 Err:509 -
- Gate Valve dia. 2", Cast iron class K10 bh Err:509 Err:509 -

3 PADA HEADER -
- Gate Valve dia. 2", Cast iron class K10 bh Err:509 Err:509 -
- Air Vent dia. 1,25", Cast iron class K10 bh Err:509 Err:509 -
- Safety Valve dia. 1,25", Cast iron clas K10 bh Err:509 Err:509 -

2.2 PERALATAN PENGATUR PADA PRESSURE


TANK
- Gate Valve dia. 2", Cast iron class K10 bh Err:509 Err:509 -
- Ball Valve dia. 0,75", Cast iron class K10 bh Err:509 Err:509 -
- Safety Valve dia. 1,25", Cast iron clas K10 bh Err:509 Err:509 -
- Air Vent dia. 1,25", Cast iron class K10 bh Err:509 Err:509 -

2.3 PERALATAN PENGATUR PADA POMPA SUMP PIT


- Check valve dia. 3", Cast iron class K10 bh Err:509 Err:509 -
- Flexible conection dia. 3", Cast iron class K10 bh Err:509 Err:509 -
- Gate Valve dia. 3", Cast iron class K10 bh Err:509 Err:509 -

2.4 PERALATAN PENGATUR PADA POMPA DRAIN


- Check valve dia. 3", Cast iron class K10 bh Err:509 Err:509 -
- Flexible conection dia. 3", Cast iron class K10 bh Err:509 Err:509 -
- Gate Valve dia. 3", Cast iron class K10 bh Err:509 Err:509 -

2.5 PERALATAN PENGATUR PADA RESERVOIR


- Gate Valve dia. 2,5" (pada header reservoir) bh Err:509 Err:509 -
- Gate Valve dia. 2" (pada inlet & pipa kuras reservoir) bh Err:509 Err:509 -

2.6 PERALATAN PENGATUR INST.PIPA PDAM


- Gate Valve dia. 2", Cast iron class K10 bh Err:509 Err:509 -
- Flooter valve dia. 2", Cast iron class K10 bh Err:509 Err:509 -

2.7 Accessories (dudukan, mur+baut, packing set dll) ls Err:509 Err:509 -

` SUB TOTAL IV. O.2 -

O.3 PEK. PERALATAN KONTROL DAN UKUR


Pengadaan dan pemasangan termasuk klem, duduakan dll.

1 WLC u/Transfer pump (pada resevoir & roof tank) set Err:509 Err:509 -
2 Pressure gauge, range 0-15 Kg/cm2, dia. 6" pada Pressure tank bh Err:509 Err:509 -
3 Pressure Switch, range 0-15 Kg/cm2, pada Pressure tank bh Err:509 Err:509 -

4 Water Level Control


- Pompa Sump pit unit Err:509 Err:509 -
- Pompa grease trap unit Err:509 Err:509 -

PEKERJAAN PEMIPAAN AIR BERSIH


Pengadaan dan pemasangan termasuk klem, penyangga, penggantung dan alat bantu
PEMIPAAN AIR BERSIH DI RUANG POMPA
1 GSP klas medium :
- dia. 4" (header) m Err:509 Err:509 -
- dia. 2,5" (pipa isap pompa transfer ) m Err:509 Err:509 -
­dia. 2" (pipa tekan dari transfer pump s/d SHAFT Lt.1 ) m Err:509 Err:509 -
- Kran 1/2" m Err:509 Err:509 -
2 Fitting-fitting dan accessories lot Err:509 Err:509 -

PEMIPAAN LANTAI
1 PIPA PP-R PN 10 :
­dia. 2" (pipa distribusi dari Roof tank u/Lt.1 ) m Err:509 Err:509 -
- dia. 1 1/2" m Err:509 Err:509 -
- Gate Valve dia. 2", Cast iron class K10 m Err:509 Err:509 -
2 Fitting-fitting dan accessories lot Err:509 Err:509 -

PEK. PEMIPAAN AIR HUJAN DAN DRAINAGE


penyangga, penggantung dan alat bantu Pengadaan dan pemasangan termasuk klem,
1 PVC klas AW :
­dia. 3" (pipa sump pit R. Pompa Lt.1) m Err:509 Err:509 -
­dia. 2" (dari gutter Lt. 1) m Err:509 Err:509 -
2 Fitting-fitting dan accessories lot Err:509 Err:509 -

PEKERJAAN PEMIPAAN AIR KOTOR,


AIR BEKAS DAN VENT
Pengadaan dan pemasangan termasuk klem, penyangga, penggantung dan alat bantu
1 PVC klas AW :
- dia. 8" (pipa utama air kotor Shaft ke STP) m Err:509 Err:509 -
- dia. 6" (pipa utama air kotor Shaft ke STP) m Err:509 Err:509 -
2 Fitting-fitting dan accessories lot Err:509 Err:509 -

` SUB TOTAL IV. O.3 -

O.4 LANTAI 1
PEKERJAAN PEMIPAAN AIR BERSIH
Pengadaan dan pemasangan termasuk klem, penyangga, penggantung dan alat bantu
PEMIPAAN AIR BERSIH
1 PIPA PP-R PN 10 :
- dia. 2" m Err:509 Err:509 -
- dia. 1 1/2" m Err:509 Err:509 -
- dia. 1" m Err:509 Err:509 -
- dia. 1/2" m Err:509 Err:509 -
- Gate Valve dia. 1 1/2", Cast iron class K10 bh Err:509 Err:509 -
- Kran 1/2" bh Err:509 Err:509 -
2 Fitting-fitting dan accessories lot Err:509 Err:509 -

PEKERJAAN PEMIPAAN AIR KOTOR,


AIR BEKAS DAN VENT
1 PVC klas AW :
- dia. 8" (pipa tegak/utama air kotor di shaft) m Err:509 Err:509 -
- dia. 6" (pipa tegak/utama air bekas di shaft) m Err:509 Err:509 -
- dia. 6" m Err:509 Err:509 -
- dia. 4" m Err:509 Err:509 -
- dia. 2" (dari FD & LAV) m Err:509 Err:509 -
- dia. 1 1/4" (air vent) m Err:509 Err:509 -
- Floor drain dia. 2" lkp. dengan water trap bh Err:509 Err:509 -
2 Fitting-fitting dan accessories lot Err:509 Err:509 -

PEK. PEMIPAAN AIR HUJAN DAN DRAINAGE


Pengadaan dan pemasangan termasuk klem, penyangga, penggantung dan alat bantu
1 PVC klas AW :
­dia. 4" (pipa tegak air hujan dalam shaft ) m Err:509 Err:509 -
2 Fitting-fitting dan accessories lot Err:509 Err:509 -

` SUB TOTAL IV. O.4 -

O.5 LANTAI 2
PEKERJAAN PEMIPAAN AIR BERSIH
Pengadaan dan pemasangan termasuk klem, penyangga, penggantung dan alat bantu
1 PIPA PP-R PN 10 :
- dia. 3" (Riser) m Err:509 Err:509 -
- dia. 2" m Err:509 Err:509 -
- dia. 1 1/2" m Err:509 Err:509 -
- dia. 1" m Err:509 Err:509 -
- dia. 1/2" m Err:509 Err:509 -
2 Gate valve : Err:509 Err:509
- Gate Valve dia. 2", Cast iron class K10 bh Err:509 Err:509 -
- Gate Valve dia. 1", Cast iron class K10 bh Err:509 Err:509 -
- Kran 1/2" m Err:509 Err:509 -
3 Fitting-fitting dan accessories lot Err:509 Err:509 -

PEKERJAAN PEMIPAAN AIR KOTOR,


AIR BEKAS DAN VENT
Pengadaan dan pemasangan termasuk klem, penyangga, penggantung dan alat bantu
1 PVC klas AW :
- dia. 8" (pipa tegak/utama air kotor di shaft) m Err:509 Err:509 -
- dia. 6" (pipa tegak/utama air bekas di shaft) m Err:509 Err:509 -
- dia. 6" m Err:509 Err:509 -
- dia. 4" m Err:509 Err:509 -
- dia. 2" (dari FD & LAV) m Err:509 Err:509 -
- dia. 1 1/4" (air vent) m Err:509 Err:509 -
2 - Floor drain dia. 2" lkp. dengan water trap bh Err:509 Err:509 -
3 Fitting-fitting dan accessories lot Err:509 Err:509 -

PEKERJAAN PEMIPAAN AIR HUJAN,


Pengadaan dan pemasangan termasuk klem, penyangga, penggantung dan alat bantu
1 PVC klas AW :
­dia. 4" (pipa tegak air hujan dalam shaft) m Err:509 Err:509 -
- dia. 2" (dari balkon ke pipa tegak air hujan dalam shaft) m Err:509 -
2 Fitting-fitting lot Err:509 Err:509 -

` SUB TOTAL IV. O.5 -

O.6 LANTAI 3
PEKERJAAN PEMIPAAN AIR BERSIH
Pengadaan dan pemasangan termasuk klem, penyangga, penggantung dan alat bantu
1 PIPA PP-R PN 10 :
- dia. 3" (Riser) m Err:509 Err:509 -
- dia. 2" m Err:509 Err:509 -
- dia. 1 1/2" m Err:509 Err:509 -
- dia. 1" m Err:509 Err:509 -
- dia. 1/2" m Err:509 Err:509 -
2 Gate valve : Err:509 Err:509
- Gate Valve dia. 2", Cast iron class K10 bh Err:509 Err:509 -
- Gate Valve dia. 1", Cast iron class K10 bh Err:509 Err:509 -
3 Kran 1/2" m Err:509 Err:509 -
4 Fitting-fitting dan accessories lot Err:509 Err:509 -

PEKERJAAN PEMIPAAN AIR KOTOR,


AIR BEKAS DAN VENT
Pengadaan dan pemasangan termasuk klem, penyangga, penggantung dan alat bantu
1 PVC klas AW :
- dia. 8" (pipa tegak/utama air kotor di shaft) m Err:509 Err:509 -
- dia. 6" (pipa tegak/utama air bekas di shaft) m Err:509 Err:509 -
- dia. 6" m Err:509 Err:509 -
- dia. 4" m Err:509 Err:509 -
- dia. 2" (dari FD & LAV) m Err:509 Err:509 -
- dia. 1 1/4" (air vent) m Err:509 Err:509 -
2 Floor drain dia. 2" lkp. dengan water trap bh Err:509 Err:509 -
3 Fitting-fitting dan accessories lot Err:509 Err:509 -

PEKERJAAN PEMIPAAN AIR HUJAN,


Pengadaan dan pemasangan termasuk klem, penyangga, penggantung dan alat bantu
1 PVC klas AW :
­dia. 4" (pipa tegak air hujan dalam shaft) m Err:509 Err:509 -
- dia. 2" (dari balkon ke pipa tegak air hujan dalam shaft) m Err:509 -
2 Fitting-fitting lot Err:509 Err:509 -

` SUB TOTAL IV. O.6 -

O.7 LANTAI DAK ATAP


PEKERJAAN PERALATAN UTAMA
Pengadaan dan pemasangan peralatan utama termasuk dudukan /pondasi dll.
1 Booster pump lengkap dengan controller unit Err:509 Err:509 -
Kapasitas : 3 x (@320 Liter/menit)
Total head : 15 Meter
Jenis : Centryfugal end suction
Power consumtions : 1,8 KW/220-380V/3P/50Hz.

2 Reservoir Atas (Roof tank)


Kapasitas : 15 m3 unit Err:509 Err:509 -
Jenis bahan : FRC

PEMIPAAN AIR BERSIH


1 PIPA PP-R PN 10 :
- dia. 4" (Header) m Err:509 Err:509 -
- dia. 3" (pipa tegak di shaft MEP) m Err:509 Err:509 -
- Gate Valve dia. 3", Cast iron class K10 bh Err:509 Err:509 -
2 Kran 1/2" m Err:509 Err:509 -
3 Fitting-fitting dan accessories lot Err:509 Err:509 -

PEKERJAAN PEMIPAAN AIR HUJAN,


Pengadaan dan pemasangan termasuk klem, penyangga, penggantung dan alat bantu
1 Roof Drain
- dia. 4" bh Err:509 Err:509 -

` SUB TOTAL IV. O.7 -


` SUB TOTAL IV. O -

V PEKERJAAN TRANSPORTASI

ELEVATOR (LIFT)
Pengadaan, Pemasangan dan Pengetesan Peralatan Utama termasuk
Panel kontrol, dudukan dan material bantu sesuai Gambar
dan spesifikasi

1 LIFT-1 PASSENGER (P1) unit 1.00 - -


Kode Lift

Lantai Yang Dilayani : lantai 1 s/d lantai 3


Kapasitas : 1.600 (kg) /20 orang
Kecepatan : 60 mpm (1.0 m/s)
Penggerak kontrol : AC-VVVF (Variable Valtage, Variable Freq)
Operation :
Lebar Pintu : 1.300 mm (Center Opening)
Tinggi Pintu : 2.100 mm
Ukuran Car Lift : 1.400 X 2.400 mm
Ukuran Hoistway : 2.400 x 2900 mm
Pit Dept : 1.500 mm
Tinggi Ruang Mesin : 2.600 mm
Over Head : 4.200 mm
Power Listrik : 24,5 Kw / 380 V / 3 Ph / 50 Hz (PROV)

2 LIFT-2 PASSENGER (P2) unit 2.00 - -


Kode Lift

Lantai Yang Dilayani : LF-P2


Kapasitas
Kecepatan : lantai 1 s/d lantai 3
Penggerak kontrol : 1.600 (kg) /20 orang
Operation : 60 mpm (1.0 m/s)
Lebar Pintu : AC-VVVF (Variable Valtage, Variable Freq)
Tinggi Pintu :
Ukuran Car Lift : 1.300 mm (Center Opening)
Ukuran Hoistway : 2.100 mm
Pit Dept : 1.700 X 1.800 mm
Tinggi Ruang Mesin : 2.4000 x 2900 mm
Over Head : 2.100 mm
Power Listrik : 2.600 mm
: 5.000 mm
: 24,5 Kw / 380 V / 3 Ph / 50 Hz (PROV)

Pengadaan dan pemasangan Automatic Rescue Device (ARD)

1 Supervisory Panel c/w 4 buah intercom unit -

2 Panel kontrol Lift P1 set -


Panel kontrol Lift P2
2 PP - LIFT/T unit -
3 PP - F.LIFT/T unit -
unit -
4 Separator Beam unit -
Intermediate Beam
5 Checker Plate di ruang mesin Lift ls -
6 Earthquake Safety Device di Ruang Mesin Lift ls -
7 Seal Support untuk dudukan pintu Lift ls -
8 Interphone di Ruang Mesin Lift ls -
9 Air Conditioning Kapasitas : 2 PK ls -
10 Air Conditioning Kapasitas : 2 PK ls -
unit -
11 Pengadaan & Instalasi Penerangan Ruang Mesin Lift (prov) unit -
Lampu TL 1x36 W BALK + Battray bh -
Lampu TL 1x36 W BALK bh -
Saklar Ganda bh -
Stop Kontak 200 W bh -
NYM 3 x 2.5 mm2 + PVC Conduit dia. 20 mm Untuk Lampu ttk -
NYM 3 x 2.5 mm2 + PVC Conduit dia. 20 mm Untuk Stop Kontak ttk -

Testing & Commissioning unit 3.00 1,000,000.00 3,000,000.00

` SUB TOTAL V -

VI PEKERJAAN LANSKEP
A PEKERJAAN JEMBATAN PENGHUBUNG
1 Struktur
a Pondasi Bore Pile
- Beton K-250 Ready mix m3 0.22 - -
- Besi kg 237.27 - -

b Pile Cap
- Beton K-250 Ready mix m3 4.61 - -
- Besi kg 147.10 - -
- Bekisting m2 15.36 - -

c Kolom Pedestal
- Beton K-250 Ready mix m3 0.90 - -
- Besi kg 411.55 - -
- Bekisting m2 7.20 - -

d Tie Biem
- Beton K-250 Ready mix m3 4.00 - -
- Besi kg 1,271.79 - -
- Bekisting m2 13.32 - -

e Atap Baja
- Honeycomb 600x150x6.9x9 kg 3,241.92 Err:509 -
- H-Beam 350x350x9x12 kg 5,638.92 Err:509 -
- WF 350x175x6x9 kg 869.40 - -
- WF 200x100x5.5x8 kg 300.33 - -
- CNP 150x50x20x2.3 kg 480.72 Err:509 -

f Plat Lantai Jembatan


- Beton K-250 Ready mix m3 6.34 - -
- Wiremesh M-7 m2 105.60 - -
- Bondek 0.75 mm m2 52.80 - -
` SUB TOTAL VI. A -

B PEKERJAAN PAGAR
1 Pek. Struktur
a Pondasi m3 6.79 - -
- Pondasi Batu Kali
- Pondasi Telapak
- Beton m3 3.31 - -
- Besi kg 86.38 - -
- Bekisting m2 12.60 - -

b Pasir Urug t 10 cm m3 2.58 - -


c Lantai Kerja t 5 cm m3 1.35 - -
d Kolom Pedestal (20x20)
- Beton m3 0.24 - -
- Besi kg 33.95 - -
- Bekisting m2 4.80 - -

e Sloof 15/20
- Beton m3 0.68 - -
- Besi kg 97.01 - -
- Bekisting m2 0.54 - -

f Kolom pagar (20x20)


- Beton m3 18.00 - -
- Besi kg 169.76 - -
- Bekisting m2 24.00 - -

g Ring Balok 15/15


- Beton m3 0.51 - -
- Besi kg 73.31 - -
- Bekisting m2 0.90 - -

2 Pek. Arsitektur
a Pasangan Bata
- Bata Tela m2 45.00 - -

b Plester Dinding
- Dinding sisi depan m2 45.00 - -
- Dinding sisi belakang m2 45.00 - -
- Kolom sisi depan m2 13.50 - -
- Kolom sisi belakang m2 13.50 - -

c Acian Dinding
- Dinding sisi depan m2 45.00 - -
- Dinding sisi belakang m2 45.00 - -
- Kolom sisi depan m2 13.50 - -
- Kolom sisi belakang m2 13.50 - -

d Pengecatan
- Dinding sisi depan m2 45.00 - -
- Dinding sisi belakang m2 45.00 - -
- Kolom sisi depan m2 13.50 - -
- Kolom sisi belakang m2 13.50 - -
` SUB TOTAL VI. B -
DAFTAR HARGA SATUAN ITEM

SUMBER DATA : HARGA SATUAN DAN HARGA SATUAN PEKERJAAN


DAERAH :KOTA JAYAPURA 2019
No. NAMA BAHAN SAT HARGA SATUAN

1 Bahan Pasir :
1 Pasir Urug m³ 400,000.00
2 Pasir Pasang m³ 450,000.00
3 Pasir Cor m³ 450,000.00
4 Pasir Cor kg 321.43
5 Sirtu m³ 300,000.00
6 Pasir Laut m³ 1,400,000.00

2 Bahan Tanah :
1 Tanah Liat m³ 220,000.00
2 Tanah Biasa m³ 220,000.00
3 Tanah Padat m³ 260,000.00
3 Ijuk kg 75,000.00

3 Bahan Batu :
1 Batu belah 10x15, 15/20 m³ 450,000.00
2 Batu Pecah Mesin 2/3 m³ 450,000.00
3 Batu Pecah Mesin 1/2 m³ 450,000.00
4 Batu Kali m³ 450,000.00
5 Agregat A m³ 760,000.00
6 krikil kg 562.96
7 Limestone m³ 200,000.00

4 Bahan Batu Buatan :


1 Batu bata merah kelas I bh 4,000.00
2 Batu Ringan 600 x 200 x (75 - 100 mm) m³ 730,000.00
3 Bata Tela bh 4,000.00
4 Roster terawang 12x11x24 cm m² 9,500.00
5 Roster beton m² 16,500.00
5 Grassblock 60 x 30 bh 46,000.00
6 Paving Block 8 cm m² 175,000.00
7 Kansten m 116,200.00
8 Abu Batu m 235,000.00
9 Udit Beton U 40 m 525,000.00
10 Udit Beton U 60 m 900,000.00
11 Udit Beton U 80 m 1,062,000.00
12 Alat bantu ls 16,500.00

0 Bahan Portlant Cement (PC)


1 Semen / PC 50 Kg kg 1,800.00
2 Semen Warna kg 23,000.00
3 Semen / PC 50 Kg kg 1,800.00
4 Epoxy 500 Mikron kg 65,000.00
5 Beton ready mix K225 m³ 2,420,000.00
6 Beton ready mix K250 m³ 2,447,500.00
7 Beton ready mix K300 m³ 2,579,500.00
8 Beton ready mix K350 m³ 2,722,500.00
9 Asphalt Curah Pen 60-70 kg 15,000.00
10 Kerosene kg 15,000.00
11 Epoxy 500 Mikron kg 65,000.00
12 Perekat kg 9,500.00

VIII. Bahan Aluminium :


1 Kusen Aluminium warna coklat 4" m 135,000.00
2 Selimar daun pintu aluminium uk. 4,5 x 7 cm m 135,000.00
3 Selimar jendela aluminium m 110,000.00
4 Jalusi aluminium terpasang m 750,000.00
5 Cross-T 120 cm btg 19,500.00
6 Wall angle 20x20 mm x 3000 mm btg 29,500.00
7 Main-T BRS panjang 3,6 m btg 17,583.33
8 Ramset btg 3,150.00
9 Angel clip bh 4,500.00
10 Penggantung Ø 3,5 panjang 1 m bh 12,500.00
11 Rangka hollow Almuniumi 40x40x2.1 mm m' 11,250.00
12 Rangka hollow zlmunium 40 x 40 x 1,1mm      m' 7,500.00
13 Braket siku besi 40 x 40 x 4mm         m' 22,000.00
14 Bracing   set 65,000.00
15 Bracket ACP set 25,000.00
16 Besi hollow 40 x 40 x 6000 mm tebal 1,6 mm btg 155,000.00
17 Besi hollow 20 x 40 x 6000 mm tebal 1,6 mm btg 95,000.00
18 Besi Hollow 15 x 30 x 1.40 mm tebal 1,6 mm btg 65,000.00
19 C Channel btg 12,500.00
20 Metal furing btg 14,650.00
21 Suspension Braket btg 5,750.00
22 Threaded Rod/Kawat penggantung bh 11,500.00
23 Skrup bh 1,250.00
24 Daun pintu double plat aluminium spandril 20 cm bh 1,450,000.00
rangka aluminium uk. 70x210 cm+Asessories bh 3,421,000.00
IX. Bahan kawat
1 Kawat Beton / Kawat Bendrat kg 32,000.00
X. Bahan Paku
1 Paku Reng / Usuk kg 27,250.00
2 Paku Triplek/Eternit kg 27,250.00
3 Skrup bh 1,200.00

XI. Bahan Granit Tile + Keramik


1 Lantai Vinyl m² 150,000.00
2 Lem Vinyl kg 15,000.00
3 Kramik 60x60 cm m² 210,000.00
4 Keramik Lantai 40 x 40 cm m² 110,000.00
5 Keramik Lantai 30 x 30 cm m² 110,000.00
6 Keramik Lantai KM/WC 20 x 20 cm m² 93,000.00
7 Keramik dinding 20 x 25 cm m² 95,000.00
8 Keramik dinding 30x60 cm m² 135,000.00
9 plin kramik 10x60 m2 210,000.00
10 plin kramik 10x40 m2 110,000.00
11 ACP m² 585,500.00
12 Sealant bh 30,000.00
13 Skrow bh 25,000.00
14 Polygum waterproofing membran bakar roll 960,000.00
15 Primer pile 1,000,000.00
16 Aquapanel m² 376,000.00
17 Karpet lantai m² 700,000.00
18 Partisi kubikel m² 2,500,000.00
19 Batu sikat m² 120,000.00
20 raillig m 867,698.56

XII. Bahan Sanitasi :


1 Roof Drain Stainles Steel Ø 4" bh 275,000.00
2 Bak Cuci Stainles Steel bh 725,300.00
3 Bak Fiberglass 70 x 70 x 66 cm bh 270,000.00
4 Bak reservoir fiberglass ( kapasitas 1000 liter) bh 195,000.00
5 Floor drain stainles steel bh 251,350.00
6 Closed duduk/monoblock bh 2,970,000.00
7 Closed Jongkok Porselen bh 590,500.00
8 Kran Air dia. 3/4" dan 1/2" bh 141,500.00
9 Urinoir bh 1,175,000.00
10 Wastafel+Meja set 1,700,000.00
11 Water drain + asesoris bh 350,000.00
12 Tempat sabun gantung bh 175,000.00
13 Tempat sabun tanam bh 150,000.00
14 Shower ( American Standard ) bh 217,900.00
15 Jet Washer bh 385,000.00
16 Towel holder unit 650,000.00
17 Tempat Tisue unit 250,000.00
18 Perlengkapan Shower ls 350,000.00
19 Perlengkapan Jet Washer ls 57,750.00
20 Perlengkapan ls 35,000.00
21 sealtape bh
22 Pek. Kitchenzink single tube ex. Toto bh 1,085,216.00
23 Pek. Closed duduk Ex. Toto dan Jet shower + asesoris bh 3,893,769.00
24 Pek. Closed Jongkok Ex. Toto dan Jet shower + asesoris bh 655,490.00
25 Pek. Pemasangan Water Heater ex. Modena Es.50 Vh bh 2,048,017.95
26 Pek. Wastafel Wall hung ex. Toto bh 1,864,152.40
27 Pek. Tempat Wudhu t=30 cm + (kran , Floor Drain) m' 534,000.00
28 Kran shower kamar mandi panas dingin ex toto bh 1,975,000.00
29 Kran dinding ex toto bh 175,000.00
30 Spool hock bh 11,150,000.00

4 Asbes plat datar :


-Kalsiplank 20 x 240 cm tebal 8 mm lbr 45,000.00
-Kalsiplank 30 x 240 cm tebal 8 mm lbr 58,500.00
-Kalsiboard Uk. 120 x 240 cm tebal 4,5 mm lbr 79,750.00
5 Gypsum :
-Gypsumboard uk. 122x244 cm tebal 9 mm lbr 185,000.00
-Gypsum Tile Polos Uk. 60 x 120 cm tebal 9 mm lbr 24,500.00
-List Gypsum Profil 10x10 cm m 20,000.00
-List Gypsum Profil 5x5 cm m 17,500.00
-List Gypsum Profil 2x5 cm m 12,500.00
-Kalsiboard tebal 4,5 mm m 79,750.00

XIV. Bahan Kayu


1 Kayu Besi :
Kayu Besi Balok m³ 5,000,000.00
KayuBesi Reng+Usuk m³ 5,000,000.00
Kayu Besi papan 2/20, 3/20, 3/25, 3/30 m³ 5,000,000.00
2 Kayu Meranti:
Kayu Meranti 3/5, 4/6, 5/7, 6/12 m³ 4,000,000.00
Kayu Meranti Papan 2/20 m³ 5,400,000.00
3 Kayu begesting
Kayu Meranti MC m³ 2,000,000.00
4 Kayu Perancah :
Kayu Gelam / Dolken r 8-10 cm panjang 4 m btg 45,000.00
5 Kayu List :
List kayu profil kamper 2x15 cm m 24,500.00
List kayu profil kamper 2x10 cm m 18,500.00
List kayu profil kamper 2x8 cm m 15,500.00
List kayu profil kamper 1x5 cm m 8,500.00
Kayu Profil 5/10 Finish Melamine m 145,500.00
6 Kayu lokal m³ 3,150,000.00

XV. Bahan Kayu Lapis :


1 Triplek :
Triplek 122 x 244 tebal 4 mm lbr 85,000.00
Multiplek uk. 122 x 244 cm tebal 6 mm lbr 158,000.00
Multiplek uk. 122 x 244 cm tebal 9 mm lbr 220,000.00
Multiplek uk. 122 x 244 cm tebal 12 mm m2 95,740.39
Multiplek uk. 122 x 244 cm tebal 12 mm lbr 285,000.00
Multiplek uk. 122 x 244 cm tebal 18 mm lbr 305,000.00
2 Teakwood & Megatek :
Teakwood uk. 122 x 244 cm tebal 4 mm lbr 190,000.00
Megateak uk. 122 x 244 cm tebal 3 mm lbr 190,000.00
HPL 120x240 cm lbr 165,000.00

XVI. Bahan Cat Kayu dan Tembok


1 Plamir Tembok kg 30,200.00
2 Casting kg 10,500.00
3 Join tape m 2,500.00
4 Plamir Kayu kg 30,200.00
5 Cat Kayu /besi kg 65,000.00
6 Cat Dasar Tembok kg 65,000.00
7 Cat Tembok kg 27,300.00
8 Cat Tembok Eksterior (Wheathershield) kg 136,500.00
9 Cat Meni Kayu kg 65,000.00
10 Meni besi Zincromed kg 65,000.00
11 Coting Sikatop 107 kg 14,500.00
12 Lem kayu kg 87,000.00
13 Thinner A ltr 28,500.00
14 Thinner B ltr 17,500.00
15 Kertas gosok ltr 3,500.00
16 Minyak begesting ltr 31,500.00
17 Kuas bh 12,500.00
18 Waterstop lebar 20 cm m 145,000.00
19 Filler kg 642.86
20 wood stain kg
21 sanding kg
22 melamic kg
23 ampelas lbr
24 Curbing Sudut/ seal sudut m 125,000.00
DAFTAR UPAH PEKERJA
SUMBER DATA : HARGA SATUAN DAN HARGA SATUAN PEKERJAAN

NO. JENIS BAHAN SATUAN HARGA SATUAN (Rp)

1 P e k e rj a Hr 115,000
2 M an d or Hr 193,000
3 Tukang listrik Hr 155,000
4 Tukang kayu Hr 155,000
5 Kep. tk. kayu Hr 170,000
6 Tukang batu Hr 155,000
7 Kep . tk . batu Hr 170,000
8 Tukang b e s i Hr 155,000
9 Kep . tk . besi Hr 170,000
10 Tukang cat Hr 155,000
11 Kep . t k . cat Hr 170,000
12 Tukang Pipa Hr 155,000
13 Kep . t k . Pipa Hr 170,000
14 Tukang Kaca Hr 155,000
15 Kep . t k . Kaca Hr 170,000
16 Tukang plitur Hr 155,000
17 Tukang jalan Hr 155,000
18 Tukang gali Hr 155,000
19 Tukang masak aspal Hr 155,000
20 Tukang Ledeng Hr 155,000
21 M a s i n i s Alat Berat Hr 193,000
22 Pemb. Masinis Hr 155,000
23 Penjaga api Hr 155,000
24 Penjaga malam Hr 155,000
Hr 125,000
25 Sopir
Jam 4,054
Hr 85,000
26 Pembantu Sopir
Jam 3,583
27 Mandor Tukang gali Hr 193,000
28 Tukang l a s Hr 155,000
29 Kep . tk . L a s Hr 170,000
30 M an d or Hr 193,000
31 Tukang. Potong Hr 155,000
32 Tukang Bobok Hr 155,000
33 Drafter OH 5,500,000
34 Desain Engineer OH 7,500,000
35 Tenaga Harian K3 OB 1,500,000
36 Operator Jam 25,714
37 Pembantu Operator Jam 20,000
RENCANA ANGGARAN BIAYA (R.A.B.)
PEKERJAAN : REHABILITASI GEDUNG KANTOR BIRO LAYANAN PENGADAAN BARANG DAN JASA PROVINSI PAPUA
LOKASI : KOMPLEKS GEDUNG KANTOR GUBERNUR PROVINSI PAPUA
TH ANGGARAN : 2019

NO JENIS PEKERJAAN SAT VOL. HARGA SATUAN (Rp.) JUMLAH HARGA


(Rp.)

I PEKERJAAN ARSITEKTUR
A PEKERJAAN DINDING 30,509,867
A.1 RUANG STAFF PBJ
1 Pek.Keramik Dinding KM/WC m² 10.20 251,944 2,569,828
2 Pek.Cat Dinding m² 17.00 26,111 443,882
3 Pek.Wastafel bh 1.00 2,972,563 2,972,563
4 Pek.Kran Air bh 1.00 120,000 120,000

A.2 RUANG KEUANGAN


1 Pek.Cat Dinding m² 78.15 26,111 2,040,551
2 Pek.Aluminium Composite Panel (ACP) Stand AC m² 4.00 896,294 3,585,177

A.3 RUANG STAFF I


1 Pek.Cat Dinding m² 102.00 26,111 2,663,291

A.4 RUANG KEPALA BIRO PBJ


1 Pek.Cat Dinding m² 102.00 26,111 2,663,291
2 Pek.Aluminium Composite Panel (ACP) Stand AC m² 4.00 896,294 3,585,177

A.5 RUANG ARSIP


1 Pek.Cat Dinding m² 39.00 26,111 1,018,317

A.6 RUANG PANTRY


1 Pek.Cat Dinding m² 42.25 26,111 1,103,177

A.7 RUANG PEMBUKTIAN 1


1 Pek.Cat Dinding m² 54.15 26,111 1,413,894

A.8 RUANG PEMBUKTIAN 2


1 Pek.Cat Dinding m² 54.15 26,111 1,413,894
2 Pek.Aluminium Composite Panel (ACP) Stand AC m² 4.00 896,294 3,585,177

A.9 RUANG PEMBUKTIAN 3


1 Pek.Cat Dinding m² 51.00 26,111 1,331,646

B PEKERJAAN PLAFOND 9,457,161


B.1 RUANG STAFF PBJ
1 Pek.Cat Plafond m² 35.67 26,111 931,369

B.3 RUANG STAFF I


1 Pek.Cat Plafond m² 99.60 26,111 2,600,626
2 Pek.List Plafon Gypsum m' 41.70 60,202 2,510,419

B.4 RUANG PANTRY


1 Pek.Cat Plafond m² 5.00 26,111 130,554

B.5 RUANG PEMBUKTIAN 1


1 Pek.Cat Plafond m² 20.20 26,111 527,436

B.6 RUANG PEMBUKTIAN 2


1 Pek.Cat Plafond m² 20.20 26,111 527,436

B.7 RUANG PEMBUKTIAN 3


1 Pek.Plafond Gypsum m² 18.00 97,741 1,759,329
2 Pek.Cat Plafond m² 18.00 26,111 469,993

C PEKERJAAN PINTU 451,986


C.1 RUANG STAFF PBJ
1 Pek.Kusen Pintu KM/WC m³ 0.03 10,442,974 271,517
2 Pek.Cat Kusen m² 1.56 16,526 25,781
3 Pek.Cat Pintu Panel m² 1.68 16,526 27,764

C.2 RUANG KEUANGAN


1 Pek.Cat Kusen m² 3.00 16,526 49,579

C.3 RUANGAN PANTRY


1 Pek.Kusen Pintu m³ 1.50 16,526 24,790
2 Pek.Cat Kusen m² 1.50 16,526 24,790
3 Pek.Cat Pintu Panel m² 1.68 16,526 27,764
A.4.7.1.4. 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A Pekerja L.01 OH 0,07 115,000.00 8,050.00


Tukang cat L.02 OH 0,009 155,000.00 1,395.00
Kepala tukang L.03 OH 0,006 170,000.00 1,020.00
Mandor L.04 OH 0,003 193,000.00 579.00
JUMLAH TENAGA KERJA 11,044.00
B BAHAN
Cat menie Kg 0,20 65,000.00 13,000.00
Plamuur Kg 0,15 30,200.00 4,530.00
Cat dasar Kg 0,17 65,000.00 11,050.00
Cat penutup Kg 0,26 65,000.00 16,900.00
Kuas buah 0,01 12,500.00 125.00
Pengencer Kg 0,03 28,500.00 855.00
Ampelas Lbr 0,2 15,000.00 3,000.00
JUMLAH HARGA BAHAN 3,980.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 15,024.00
E Overhead & Profit 10 % 10% x D (maksimum) 1,502.40
F Harga Satuan Pekerjaan (D+E) 16,526.40

A.4.7.1.11. 1 m2 pengecatan 1 m2 tembok Dan Plafon lama (1 lapis cat dasar, 2 lapis cat Penutup)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A Pekerja L.01 OH 0,028 115,000.00 3,220.00


Tukang cat L.02 OH 0,042 155,000.00 6,510.00
Kepala tukang L.03 OH 0,0042 170,000.00 714.00
Mandor L.04 OH 0,003 193,000.00 579.00
JUMLAH TENAGA KERJA 11,023.00
B BAHAN
Cat dasar Kg 0,12 65,000 7,800.00
Cat penutup Kg 0,18 27,300 4,914.00
JUMLAH HARGA BAHAN 12,714.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 23,737.00
E Overhead & Profit 15 % 10% x D (maksimum) 2,373.70
F Harga Satuan Pekerjaan (D+E) 26,110.70
A.4.5.1.7. Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240x9)
mm, tebal 9 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A Pekerja L.01 OH 0,100 115,000.00 11,500.00


Tukang kayu L.02 OH 0,050 155,000.00 7,750.00
Kepala tukang L.03 OH 0,005 170,000.00 850.00
Mandor L.04 OH 0,005 193,000.00 965.00
JUMLAH TENAGA KERJA 21,065.00
B BAHAN
Gypsum board Lembar 0,364 185,000 22,880.00
Paku skrup kg 0,110 1,200 44,910.00
JUMLAH HARGA BAHAN 67,790.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 88,855.00
E Overhead & Profit 10 % 10% x D (maksimum) 8,885.50
F Harga Satuan Pekerjaan (D+E) 97,740.50
Memasang 1 m' list plafond gypsum profil

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A Pekerja OH 0.060 115,000.00 6,900.00


Tukang batu OH 0.060 155,000.00 9,300.00
Kepala tukang OH 0.006 170,000.00 1,020.00
Mandor OH 0.003 193,000.00 579.00
JUMLAH TENAGA KERJA 17,799.00
B BAHAN
List plafond gypsum m' 1.050 35,000 36,750.00
Tepung gypsum kg 0.150 1,200 180.00
JUMLAH HARGA BAHAN 36,930.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 54,729.00
E Overhead & Profit 10 % 10% x D (maksimum) 5,472.90
F Harga Satuan Pekerjaan (D+E) 60,201.90

1 M² Pekerjaan Alumunium Composite Panel


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.20 115,000.00 23,000.00
Tukang L.02 OH 0.10 155,000.00 15,500.00
Kepala Tukang L.03 OH 0.010 170,000.00 1,700.00
Mandor L.04 OH 0.001 193,000.00 193.00
JUMLAH TENAGA KERJA 40,393.00
B BAHAN
Rangka hollow Almuniumi 40x40x2.1 mm m' 4.80 11,250.00 54,000.00
Rangka hollow zlmunium 40 x 40 x 1,1mm      m' 2.00 7,500.00 15,000.00
Braket siku besi 40 x 40 x 4mm         m' 1.00 22,000.00 22,000.00
Bracing   set 1.00 65,000.00 65,000.00
Bracket ACP set 1.00 25,000.00 25,000.00
Alumunium composte panel PVDF Seven m2 1.00 585,500.00 585,500.00
Skrup fixer Bh 3.00 1,200.00 3,600.00
Sealant bh 0.14 30,000.00 4,320.00
JUMLAH HARGA BAHAN 774,420.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 814,813.00


E Overhead & Profit 10 % 10% x D (maksimum) 81,481.30
F Harga Satuan Pekerjaan (D+E) 896,294.30

1 M² Pasang Dinding Keramik 20x25 Cm Corak


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.09 115,000.00 10,062.50
Tukang batu L.02 OH 0.58 155,000.00 89,900.00
Kepala tukang L.03 OH 0.045 170,000.00 7,650.00
Mandor L.04 OH 0.019 193,000.00 3,628.40
JUMLAH TENAGA KERJA 111,240.90
B BAHAN
Keramik 20X25 cm ds 1.00 95,000.00 95,000.00
Semen Portland kg 8.00 1,800.00 14,400.00
Pasir Pasang M3 0.018 450,000.00 8,100.00
Semen Warna kg 0.01 23,000.00 299.00
JUMLAH HARGA BAHAN 117,799.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 229,039.90


E Overhead & Profit 10 % 10% x D (maksimum) 22,903.99
F Harga Satuan Pekerjaan (D+E) 251,943.89
Mmembuat dan memasang 1 m3 kusen pintu dan kusen jendela, kayu kelas I
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A Pekerja L.01 OH 7.000 115,000.00 805,000.00


Tukang Kayu L.02 OH 21.000 155,000.00 3,255,000.00
Kepala tukang L.03 OH 2.100 170,000.00 357,000.00
Mandor L.04 OH 0.350 193,000.00 67,550.00
JUMLAH TENAGA KERJA 4,484,550.00
B BAHAN
Balok kayu kls I m3 1.100 4,500,000.00 4,950,000.00
Paku 10 cm kg 1.250 27,250.00 34,062.50
Lem kayu kg 1.000 25,000.00 25,000.00
JUMLAH HARGA BAHAN 5,009,062.50
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 9,493,612.50
E Overhead & Profit 10 % 10% x D (maksimum) 949,361.25
F Harga Satuan Pekerjaan (D+E) 10,442,973.75

A.5.1.1 5. (K3) Pemasangan 1 buah wastafel


Harga
Satuan Jumlah Harga
NO Uraian Kode Satuan Koefisien (RP)
(RP)

A TENAGA
Pekerja L.01 OH 1.20 117,000.00 140,400.00
Tukang kayu L.02 OH 1.45 155,000.00 224,750.00
Kepala tukang L.03 OH 0.15 170,000.00 25,500.00
Mandor L.15 OH 0.06 193,000.00 11,580.00
JUMLAH TENAGA KERJA 402,230.00
B BAHAN
Wastafel Unit 1.20 1,700,000.00 2,040,000.00
Semen Portland Kg 6.00 1,800.00 10,800.00
Pasir pasang m3 0.01 450,000.00 4,500.00
Perlengkapan % 12.00 244,800.00
JUMLAH HARGA BAHAN 2,300,100.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 2,702,330.00
E Overhead & Profit 10 % 10% x D (maksimum) 270,233.00
F Harga Satuan Pekerjaan (D+E) 2,972,563.00
I PEKERJAAN ARSITEKTUR
A PEKERJAAN DINDING
A.1 RUANG STAFF PBJ
1 Pek.Keramik Dinding KM/WC m² 6.80 1.50
6.80 2.50
A.2 RUANG KEUANGAN
1 Pek.Cat Dinding m² 26.05 3.00
Pek.Aluminium Composite Panel (ACP) Stand m² 1.00 4.00

A.3 RUANG STAFF I


1 Pek.Cat Dinding m² 34 3

A.4 RUANG KEPALA BIRO PBJ


1 Pek.Cat Dinding m² 14 3
Pek.Aluminium Composite Panel (ACP) Stand m² 1.00 4

A.5 RUANG ARSIP


1 Pek.Cat Dinding Dan Plafond m² 12 3.25

A.6 RUANG PANTRY


1 Pek.Cat Dinding m² 13 3.25

A.7 RUANG PEMBUKTIAN 1


1 Pek.Cat Dinding Plafon m² 18.05 3

A.8 RUANG PEMBUKTIAN 2


1 Pek.Cat Dinding m² 18.05 3
2 Pek.Aluminium Composite Panel (ACP) Stand m² 1.00 4

A.9 RUANG PEMBUKTIAN 3


1 Pek.Cat Dinding m² 17 3

B PEKERJAAN PLAFOND
B.1 RUANG STAFF PBJ
1 Pek.Cat Plafond m² 5.8 6.15

B.3 RUANG STAFF I


1 Pek.Cat Plafond m² 12 7.1
m² 3.6 4
2 Pek.List Plafon Gypsum m² 0.15 41.7

B.4 RUANG PANTRY


1 Pek.Cat Dinding m² 2.5 2

B.5 RUANG PEMBUKTIAN 1


1 Pek.Cat Plafond m² 4 5.05

B.6 RUANG PEMBUKTIAN 2


1 Pek.Cat Plafond m² 4 5.05

B.7 RUANG PEMBUKTIAN 3


2 Pek.Plafond Gypsum m² 4.5 4
3 Pek.Cat Plafond m² 4.5 4

C PEKERJAAN PINTU
C.1 RUANG STAFF PBJ
1 Pek.Kusen Pintu KM/WC m² 5.2 0.005
2 Pek.Cat Kusen m² 5.2 0.3
3 Pek.Cat Pintu Panel m² 0.8 2.1

C.2 RUANG KEUANGAN


1 Pek.Cat Kusen m² 5 0.3

C.3 RUANGAN PANTRY


1 Pek.Kusen Pintu m³ 5 0.3
2 Pek.Cat Kusen m² 5 0.3
3 Pek.Cat Pintu Panel m² 0.8 2.1
10.20
17.00

78.15
4.00

102

42
4

39

42.25

54.15

54.15
54.15

51

35.67

85.2 99.6
14.4
6.255

5
20.2

20.2

18
18

0.026
1.56
1.68

2 3

1.5
1.5