TOTAL
NO URAIAN PEKERJAAN STN HARGA
Rp.
PPN 10 % Rp.
I LANTAI BASEMENT - 2
1 PEKERJAAN FAN COIL UNIT
Pengadaan dan pemasangan Fan Coil Unit, lengkap dengan kabel kotrol, thermostat,
Acesoris dan peralatan bantu
a FCU - B2 - 1 & 2 unit
Service : R.DOSEN , MUSHOLLA
Kapasitas Total : 15.000 BTU/H
Sensible : 9.000 BTU/H
Vol. Udara : 400 ~ 600 CFM
Daya Input : 0,025 220/3/50HZ
Tipe Indoor : Horizontal flow
Water flow rate : 0.35 cmh ( dia 25 mm )
entering/leaving : 7 dgre / 12 dgre
15,000,000.00 TAHAP II
450,000.00 TAHAP II
2,700,000.00 TAHAP II
1,200,000.00 TAHAP II
NO URAIAN PEKERJAAN STN
300,000.00 TAHAP II
240,000.00 TAHAP II
180,000.00 TAHAP II
420,000.00 -
420,000.00 -
180,000.00 TAHAP II
110,000.00 TAHAP II
174,000.00 TAHAP II
434,000.00 -
744,000.00 -
360,000.00 -
1,250,000.00 TAHAP II
97,000.00 TAHAP II
98,000.00 -
NO URAIAN PEKERJAAN STN
650,000.00 TAHAP II
1,100,000.00 -
1,550,000.00 -
700,000.00 TAHAP II
1,300,000.00 -
1,700,000.00 -
6,000,000.00 TAHAP II
6,000,000.00 -
7,500,000.00 -
8,000,000.00 TAHAP II
9,600,000.00 -
11,000,000.00 -
1,500,000.00 TAHAP II
800,000.00 TAHAP II
1,200,000.00 TAHAP II
33,000.00 TAHAP II
44,000.00 TAHAP II
55,000.00 -
66,000.00 TAHAP II
88,000.00 TAHAP II
18,500.00 TAHAP II
21,000.00 TAHAP II
310,733.00 -
244,400.00 -
313,300.00 TAHAP II
-
NO URAIAN PEKERJAAN STN
22,000,000.00 TAHAP II
32,000,000.00 TAHAP II
NO URAIAN PEKERJAAN STN
c FCU - B1 - 3 unit
Service : R. Berkumpul Tertutup
Kapasitas Total : 60.000 BTU/H
Sensible : 37.200 BTU/H
Vol. Udara : 1.882 CFM
Daya Input : 0,37 Kw 380/3/50HZ
Tipe Indoor : Horizontal flow
Water flow rate : 0.35 cmh ( dia 25 mm )
entering/leaving : 7 dgre / 12 dgre
d FCU - B1 - 4 & 5 unit
Service : R.DOSEN & MUSHOLLA
Kapasitas Total : 15.000 BTU/H
Sensible : 9.000 BTU/H
Vol. Udara : 400 ~ 600 CFM
Daya Input : 0,025 220/3/50HZ
Tipe Indoor : Horizontal flow
Water flow rate : 0.35 cmh ( dia 25 mm )
entering/leaving : 7 dgre / 12 dgre
2 PEKERJAAN MEKANIKAL FAN
Pengadaan dan pemasangan INTAKE & EXHAUST FAN
lengkap dengan Kable kotrol, Speed Kotrol , Acesoris dan peralatan bantu
a EF - B1 - 1, 2, 3 & 4 unit
Service : Locker 1 & 2, R. ME & Dapur
Kapasitas Total : 265 CFM
Daya Input : 30 Watt, 220 / 1 / 50 HZ
Tipe Fan : Ceiling Extractor Fan
b EF - B1 - 5 & 6 unit
Service : Exhaust Area LAB.
Kapasitas Total : 6.745 CFM
Daya Input : 2,238 Watt, 220 / 1 / 50 HZ
Tipe Fan : Axial Tube Fan
c IF - B1 - 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17 & 18 unit
Service : R. Mengikir, R. Bengkel Gerinda, R. Mesin Milling &
R. Bubut
Kapasitas Total : 6.745 CFM
Daya Input : 65 Watt, 220 / 1 / 50 HZ
Tipe Fan : Natural Ceiling Fan
3 Pengadaan dan pemasangan ducting AC suplly dan return dengan PIR panel Duct
Polyisocyanurate, Non CFC, tebal 20 mm density 54 kg/m3, Thermal konductivity
HARGA TOTAL
VOLUME SATUAN HARGA
Rp Rp
37,000,000.00 TAHAP II
15,000,000.00 TAHAP II
450,000.00 TAHAP II
2,700,000.00 TAHAP II
1,200,000.00 TAHAP II
NO URAIAN PEKERJAAN STN
300,000.00 TAHAP II
240,000.00 TAHAP II
180,000.00 TAHAP II
420,000.00 -
420,000.00 -
180,000.00 -
110,000.00 -
174,000.00 -
434,000.00 TAHAP II
744,000.00 -
360,000.00 -
1,250,000.00 TAHAP II
NO URAIAN PEKERJAAN STN
97,000.00 TAHAP II
98,000.00 TAHAP II
111,000.00 TAHAP II
131,000.00 TAHAP II
131,000.00 TAHAP II
230,000.00 TAHAP II
285,000.00 TAHAP II
650,000.00 TAHAP II
1,100,000.00 TAHAP II
1,550,000.00 TAHAP II
700,000.00 TAHAP II
1,300,000.00 TAHAP II
1,700,000.00 TAHAP II
6,000,000.00 TAHAP II
6,000,000.00 TAHAP II
7,500,000.00 TAHAP II
8,000,000.00 TAHAP II
9,600,000.00 TAHAP II
11,000,000.00 TAHAP II
1,500,000.00 TAHAP II
800,000.00 TAHAP II
1,200,000.00 TAHAP II
33,000.00 -
44,000.00 TAHAP II
55,000.00 -
66,000.00 TAHAP II
88,000.00 TAHAP II
18,500.00 TAHAP II
21,000.00 TAHAP II
NO URAIAN PEKERJAAN STN
310,733.00 -
244,400.00 -
313,300.00 TAHAP II
4 22,000,000.00 88,000,000.00
NO URAIAN PEKERJAAN STN
b FCU - D - 2 unit
Service : R. Kelas
Kapasitas Total : 30.000 BTU/H
Sensible : 18.000 BTU/H
Vol. Udara : 1.059 CFM
Daya Input : 0,25 Kw 380/3/50HZ
Tipe Indoor : Horizontal flow
Water flow rate : 0.35 cmh ( dia 25 mm )
entering/leaving : 7 dgre / 12 dgre
c FCU - D - 3 & 4 unit
Service : R. Dosen & R. Kelas
Kapasitas Total : 24.000 BTU/H
Sensible : 16.320 BTU/H
Vol. Udara : 800 CFM
Daya Input : 0,1 Kw 380/3/50HZ
Tipe Indoor : Horizontal flow
Water flow rate : 0.35 cmh ( dia 25 mm )
entering/leaving : 7 dgre / 12 dgre
d FCU - D - 6 & 8 unit
Service : KTR ADM
Kapasitas Total : 50.000 BTU/H
Sensible : 30.500 BTU/H
Vol. Udara : 1.882 CFM
Daya Input : 0,37 Kw 380/3/50HZ
Tipe Indoor : Horizontal flow
Water flow rate : 0.35 cmh ( dia 25 mm )
entering/leaving : 7 dgre / 12 dgre
e FCU - D - 10 & 11 unit
Service : R.DOSEN & MUSHOLLA
Kapasitas Total : 15.000 BTU/H
Sensible : 9.000 BTU/H
Vol. Udara : 400 ~ 600 CFM
Daya Input : 0,025 220/3/50HZ
Tipe Indoor : Horizontal flow
Water flow rate : 0.35 cmh ( dia 25 mm )
entering/leaving : 7 dgre / 12 dgre
2 PEKERJAAN MEKANIKAL FAN
Pengadaan dan pemasangan INTAKE & EXHAUST FAN
lengkap dengan Kable kotrol, Speed Kotrol , Acesoris dan peralatan bantu
HARGA TOTAL
VOLUME SATUAN HARGA
Rp Rp
1 19,000,000.00 19,000,000.00
2 17,000,000.00 34,000,000.00
2 32,000,000.00 64,000,000.00
2 15,000,000.00 30,000,000.00
NO URAIAN PEKERJAAN STN
a EF - D - 1, 2, 3, 4 & 7 unit
Service : Locker 1 & 2, R. ME & Dapur
Kapasitas Total : 265 CFM
Daya Input : 30 Watt, 220 / 1 / 50 HZ
Tipe Fan : Ceiling Extractor Fan
b EF - D - 5 & 6 unit
Service : Exhaust Area LAB.
Kapasitas Total : 6.745 CFM
Daya Input : 2,238 Watt, 220 / 1 / 50 HZ
Tipe Fan : Axial Tube Fan
c IF - D - 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21 & 22 unit
Service : R. Praktek Engine Stand, Persiapan Engine Stand,
Tunning Kendaraan Operasional, Kelistrikan Mesin
Industri, Pengujian Mesin, Perawatan Mesin Industri,
Perawatan Pengujian Mesin, Perawatan dasar 1 & 2
Kapasitas Total : 6.745 CFM
Daya Input : 65 Watt, 220 / 1 / 50 HZ
Tipe Fan : Natural Ceiling Fan
HARGA TOTAL
VOLUME SATUAN HARGA
Rp Rp
5 450,000.00 2,250,000.00
2 2,700,000.00 5,400,000.00
22 1,200,000.00 26,400,000.00
NO URAIAN PEKERJAAN STN
d IF - D - 23 unit
Service : Pos Jaga
Kapasitas Total : 1.500 CFM
Daya Input : 40 Watt, 220 / 1 / 50 HZ
Tipe Fan : Natural Wall Fan
3 Pengadaan dan pemasangan ducting AC suplly dan return dengan PIR panel Duct
Polyisocyanurate, Non CFC, tebal 20 mm density 54 kg/m3, Thermal konductivity
0,0117w/m°C Temperatur bekerja - 60s/d 80 °C, Flame retardan lengkap dengan
acesoris,pengantung &material bantu.
a Pekerjaan Ducting Toilet tanpa isolasi
- 250 x 250 BJLS 60 1 m2 mtr
- 200 x 150 BJLS 60 0.8 m2 mtr
- 150 x 150 BJLS 60 0.6 m2 mtr
4 Pengadaan dan pekerjaan Air Terminal c/w accessories
a Diffuser 300 x 300 c/w spliter damper bh
b Return Diffuser 400 x 200 mm c/w bok bh
c Spigot dia 200 mm bh
d Flexible Duct c/w isolasi dia. 150 mm mtr
e EAG 150 x 150 mm c/w spliter damper. bh
f Volume damper 250 x 250 mm shaft toilet . bh
g Volume damper 300 x 300 mm . bh
h Door grille 600 x 400 bh
i Drain pant indoor unit berikut hanger bh
5 Pekerjaan Instalasi Perpipaan & Valve
a Pengadaan dan pekerjaan pipa CHWS &CHWR GIP medium lengkap
dengan isolasi class 1 APDM tebal 20 s/d
Dia 1" ( 25 mm ) m
Dia 1 1/8 " ( 28.58 mm ) m
Dia 1 3/8 " ( 32 mm ) m
Dia 1 5/8 " ( 42 mm ) m
Dia 2" ( 50 mm ) m
Dia 2,5 " ( 65 mm ) m
Dia 3" ( 80 mm ) m
b Pengadaan dan Pemasangan Valve berikut kontrol, aksesoris
dan di isolasi class 1 APDM tebal 20 s/d 25 mm
Gate Valve Dia 1" ( 25 mm ) bh
Gate Valve Dia 1 3/8 " ( 32 mm ) bh
Gate Valve Dia 1 5/8 " ( 42 mm ) bh
Y Strainer Dia 1" ( 25 mm ) bh
HARGA TOTAL
VOLUME SATUAN HARGA
Rp Rp
1 600,000.00 600,000.00
15 300,000.00 4,500,000.00
8 240,000.00 1,920,000.00
18 180,000.00 3,240,000.00
45 420,000.00 18,900,000.00
38 420,000.00 15,960,000.00
40 180,000.00 7,200,000.00
80 110,000.00 8,800,000.00
18 174,000.00 3,132,000.00
3 434,000.00 1,302,000.00
0 744,000.00 -
0 360,000.00 -
0 1,250,000.00 -
75 97,000.00 7,275,000.00
35 98,000.00 3,430,000.00
20 111,000.00 2,220,000.00
35 131,000.00 4,585,000.00
45 131,000.00 5,895,000.00
35 230,000.00 8,050,000.00
30 285,000.00 8,550,000.00
6 650,000.00 3,900,000.00
2 1,100,000.00 2,200,000.00
2 1,550,000.00 3,100,000.00
3 700,000.00 2,100,000.00
NO URAIAN PEKERJAAN STN
25 44,000.00 1,100,000.00
0 55,000.00 -
28 66,000.00 1,848,000.00
38 88,000.00 3,344,000.00
NO URAIAN PEKERJAAN STN
IV LANTAI 2
1 PEKERJAAN FAN COIL UNIT
Pengadaan dan pemasangan Fan Coil Unit, lengkap dengan kabel kotrol, thermostat,
Acesoris dan peralatan bantu
a FCU - 2 - 1, 2, 3, 4, 10, 11, 13 & 14, unit
Service : R. Kelas, R. LAB CAD/CAM, LAB DESIGN, Fisika Uji
Bahan & HeatTreatment
Kapasitas Total : 24.000 BTU/H
Sensible : 16.320 BTU/H
Vol. Udara : 800 CFM
Daya Input : 0,1 Kw 380/3/50HZ
Tipe Indoor : Horizontal flow
Water flow rate : 0.35 cmh ( dia 25 mm )
entering/leaving : 7 dgre / 12 dgre
b FCU - 2 - 5, 7, 9 & 15 unit
Service : R. Lab. Disain & R. Lab. Perlakuan Bahan
Kapasitas Total : 40.000 BTU/H
Sensible : 24.000 BTU/H
Vol. Udara : 1.059 CFM
Daya Input : 0,25 Kw 380/3/50HZ
Tipe Indoor : Horizontal flow
Water flow rate : 0.35 cmh ( dia 25 mm )
entering/leaving : 7 dgre / 12 dgre
c FCU - 2 - 6, 8, 17 & 18 unit
Service : KTR ADM, Lab Basic Hydrauliklic & Lab. Basic
Kapasitas Total : 50.000 BTU/H
HARGA TOTAL
VOLUME SATUAN HARGA
Rp Rp
54 18,500.00 999,000.00
31 21,000.00 651,000.00
0 310,733.00 -
0 244,400.00 -
64 313,300.00 20,051,200.00
528,002,200.00
8 17,000,000.00
4 22,000,000.00
4 32,000,000.00
NO URAIAN PEKERJAAN STN
1 19,000,000.00
NO URAIAN PEKERJAAN STN
e FCU - 2 - 16 unit
Service : R. Lab Flaxible Manufacturing
Kapasitas Total : 75.000 BTU/H
Sensible : 44.700 BTU/H
Vol. Udara : 2.088 CFM
Daya Input : 0,55 Kw 380/3/50HZ
Tipe Indoor : Horizontal flow
Water flow rate : 0.35 cmh ( dia 25 mm )
entering/leaving : 7 dgre / 12 dgre
f FCU - 2 - 19 unit
Service : R. Lab Flaxible Manufacturing
Kapasitas Total : 60.000 BTU/H
Sensible : 37.200 BTU/H
Vol. Udara : 1.882 CFM
Daya Input : 0,37 Kw 380/3/50HZ
Tipe Indoor : Horizontal flow
Water flow rate : 0.35 cmh ( dia 25 mm )
entering/leaving : 7 dgre / 12 dgre
g FCU - 2 - 20 unit
Service : R. Lab Gas
Kapasitas Total : 125.000 BTU/H
Sensible : 75.000 BTU/H
Vol. Udara : 3.529 CFM
Daya Input : 0,37 Kw 380/3/50HZ
Tipe Indoor : Horizontal flow
Water flow rate : 0.35 cmh ( dia 25 mm )
entering/leaving : 7 dgre / 12 dgre
h FCU - 2 - 21 & 22 unit
Service : R.DOSEN & MUSHOLLA
Kapasitas Total : 15.000 BTU/H
Sensible : 9.000 BTU/H
Vol. Udara : 400 ~ 600 CFM
Daya Input : 0,025 220/3/50HZ
Tipe Indoor : Horizontal flow
Water flow rate : 0.35 cmh ( dia 25 mm )
entering/leaving : 7 dgre / 12 dgre
2 PEKERJAAN MEKANIKAL FAN
Pengadaan dan pemasangan INTAKE & EXHAUST FAN
lengka dengan Kable kotrol, Speed Kotrol , Acesoris dan peralatan bantu
HARGA TOTAL
VOLUME SATUAN HARGA
Rp Rp
1 88,000,000.00
1 37,000,000.00
1 120,000,000.00
2 15,000,000.00
NO URAIAN PEKERJAAN STN
a EF - 2 - 1, 2, 3, 4 & 6 unit
Service : Locker 1 & 2, R. ME & Dapur
Kapasitas Total : 265 CFM
Daya Input : 30 Watt, 220 / 1 / 50 HZ
Tipe Fan : Ceiling Extractor Fan
b EF - 2 - 5 unit
Service : Exhaust Area LAB.
Kapasitas Total : 6.745 CFM
Daya Input : 2,238 Watt, 220 / 1 / 50 HZ
Tipe Fan : Axial Tube Fan
c IF - 2 - 1, 2, 3, 4, 5 & 6 unit
Service : R. Bengkel Fabrikasi & R. Meja Soldier 1 kls
Kapasitas Total : 6.745 CFM
Daya Input : 65 Watt, 220 / 1 / 50 HZ
Tipe Fan : Natural Ceiling Fan
d IF - 2 - 7 unit
Service : Pos Jaga
Kapasitas Total : 1.500 CFM
Daya Input : 40 Watt, 220 / 1 / 50 HZ
Tipe Fan : Natural Wall Fan
HARGA TOTAL
VOLUME SATUAN HARGA
Rp Rp
5 450,000.00
1 2,700,000.00
6 600,000.00
1 400,000.00
NO URAIAN PEKERJAAN STN
3 Pengadaan dan pemasangan ducting AC suplly dan return dengan PIR panel Duct
Polyisocyanurate, Non CFC, tebal 20 mm density 54 kg/m3, Thermal konductivity
0,0117w/m°C Temperatur bekerja - 60s/d 80 °C, Flame retardan lengkap dengan
acesoris,pengantung &material bantu.
a Pekerjaan Ducting AC Area Lobby & Office
- 400 x 300 PIR 1.4 m2 mtr
- 350 x 300 PIR 1.3 m2 mtr
- 300 x 300 PIR 1.2 m2 mtr
- 300 x 200 PIR 1.0 m2 mtr
- 200 x 200 PIR 0.8 m2 mtr
b Pekerjaan Ducting Toilet tanpa isolasi
- 200 x 200 BJLS 60 0.8 m2 mtr
- 200 x 150 BJLS 60 0.7 m2 mtr
- 150 x 150 BJLS 60 0.6 m2 mtr
c Pekerjaan Ducting Fresh Air ke unit tanpa isolasi
- Ø 150 BJLS 60 0.6 m2 mtr
- Ø 100 BJLS 60 0.4 m2 mtr
4 Pengadaan dan pekerjaan Air Terminal c/w accessories
a Diffuser 300 x 300 c/w spliter damper bh
b Diffuser Floor Type 600 x 600 c/w spliter damper bh
c Diffuser 400 x 200 mm c/w spliter damper bh
d Return Diffuser 400 x 200 mm c/w bok bh
e Spigot dia 200 mm bh
f Flexible Duct c/w isolasi dia. 150 mm mtr
g EAG 150 x 150 mm c/w spliter damper. bh
h Volume damper Ø 100 mm . bh
i Volume damper 150 x 150 mm . bh
j Volume damper 200 x 200 mm . bh
k Drain pant indoor unit berikut hanger bh
5 Pekerjaan Instalasi Perpipaan & Valve
a Pengadaan dan pekerjaan pipa CHWS &CHWR GIP medium lengkap
dengan isolasi class 1 APDM tebal 20 s/d
Dia 1" ( 25 mm ) m
Dia 1 1/8 " ( 28.58 mm ) m
Dia 1 3/8 " ( 32 mm ) m
Dia 1 5/8 " ( 42 mm ) m
Dia 2" ( 50 mm ) m
Dia 2,5 " ( 65 mm ) m
Dia 3" ( 80 mm ) m
HARGA TOTAL
VOLUME SATUAN HARGA
Rp Rp
0 489,300.00
3 454,350.00
6 419,400.00
7 349,500.00
22 279,600.00
0 279,600.00
0 244,650.00
8 209,700.00
16 209,700.00
25 139,800.00
8 600,000.00
76 1,400,000.00
0 365,000.00
4 365,000.00
8 185,000.00
8 135,000.00
3 200,000.00
2 280,000.00
0 425,000.00
0 475,000.00
2 1,600,000.00
34 97,000.00
14 98,000.00
14 111,000.00
40 131,000.00
22 131,000.00
18 230,000.00
52 285,000.00
NO URAIAN PEKERJAAN STN
6 650,000.00
2 1,100,000.00
2 1,550,000.00
3 700,000.00
1 1,300,000.00
1 1,700,000.00
3 6,000,000.00
1 6,000,000.00
1 7,500,000.00
3 8,000,000.00
1 9,600,000.00
1 11,000,000.00
10 1,500,000.00
10 800,000.00
10 1,200,000.00
NO URAIAN PEKERJAAN STN
V LANTAI 3
1 PEKERJAAN FAN COIL UNIT
Pengadaan dan pemasangan Fan Coil Unit, lengkap dengan kabel kotrol, thermostat,
Acesoris dan peralatan bantu
a FCU - 3 - 1 unit
Service : Perpustakaan
Kapasitas Total : 30.000 BTU/H
Sensible : 18.000 BTU/H
Vol. Udara : 1.059 CFM
Daya Input : 0,25 Kw 380/3/50HZ
Tipe Indoor : Horizontal flow
Water flow rate : 0.35 cmh ( dia 25 mm )
entering/leaving : 7 dgre / 12 dgre
b FCU - 3 - 2 unit
Service : R. Kelas Besar
Kapasitas Total : 125.000 BTU/H
Sensible : 75.000 BTU/H
Vol. Udara : 3.529 CFM
Daya Input : 0,37 Kw 380/3/50HZ
HARGA TOTAL
VOLUME SATUAN HARGA
Rp Rp
22,000.00
23 39,000.00
39 41,000.00
16 49,000.00
114 88,500.00
40 18,500.00
71 21,000.00
24 21,000.00
200,200.00 -
244,400.00 -
313,300.00 -
1 15,000,000.00
1 15,000,000.00
NO URAIAN PEKERJAAN STN
2 15,000,000.00
12 15,000,000.00
2 15,000,000.00
NO URAIAN PEKERJAAN STN
Service : R. Kelas
Kapasitas Total : 60.000 BTU/H
Sensible : 37.200 BTU/H
Vol. Udara : 1.882 CFM
Daya Input : 0,37 Kw 380/3/50HZ
Tipe Indoor : Horizontal flow
Water flow rate : 0.35 cmh ( dia 25 mm )
entering/leaving : 7 dgre / 12 dgre
f FCU - 3 - 15 unit
Service : R. Kelas
Kapasitas Total : 24.000 BTU/H
Sensible : 16.320 BTU/H
Vol. Udara : 800 CFM
Daya Input : 0,1 Kw 380/3/50HZ
Tipe Indoor : Horizontal flow
Water flow rate : 0.35 cmh ( dia 25 mm )
entering/leaving : 7 dgre / 12 dgre
g FCU - 3 - 16, 20 & 22 unit
Service : R. Kelas & KTR ADM
Kapasitas Total : 40.000 BTU/H
Sensible : 24.000 BTU/H
Vol. Udara : 1.059 CFM
Daya Input : 0,25 Kw 380/3/50HZ
Tipe Indoor : Horizontal flow
Water flow rate : 0.35 cmh ( dia 25 mm )
entering/leaving : 7 dgre / 12 dgre
h FCU - 3 - 23 & 24 unit
Service : R.DOSEN & MUSHOLLA
Kapasitas Total : 15.000 BTU/H
Sensible : 9.000 BTU/H
Vol. Udara : 400 ~ 600 CFM
Daya Input : 0,025 220/3/50HZ
Tipe Indoor : Horizontal flow
Water flow rate : 0.35 cmh ( dia 25 mm )
entering/leaving : 7 dgre / 12 dgre
2 PEKERJAAN MEKANIKAL FAN
Pengadaan dan pemasangan INTAKE & EXHAUST FAN
lengka dengan Kable kotrol, Speed Kotrol , Acesoris dan peralatan bantu
a EF - 3 - 1, 2, 3, 4 & 5 unit
HARGA TOTAL
VOLUME SATUAN HARGA
Rp Rp
1 15,000,000.00
3 15,000,000.00
2 15,000,000.00
5 2,350,000.00
NO URAIAN PEKERJAAN STN
2 2,350,000.00
1 2,350,000.00
NO URAIAN PEKERJAAN STN
665,000.00
617,500.00
3 570,000.00
4 475,000.00
12 380,000.00
160,000.00
140,000.00
120,000.00
15 120,000.00
15 80,000.00
3 600,000.00
42 1,400,000.00
1 365,000.00
1 365,000.00
4 185,000.00
4 135,000.00
200,000.00
1 280,000.00
425,000.00
475,000.00
24 1,600,000.00
66 97,000.00
14 98,000.00
45 111,000.00
50 131,000.00
38 131,000.00
30 230,000.00
75 285,000.00
52 504,000.00
40 930,000.00
0 1,368,000.00
0 1,720,000.00
NO URAIAN PEKERJAAN STN
14 650,000.00
0 1,100,000.00
0 1,550,000.00
32 1,750,000.00
0 1,880,000.00
0 2,200,000.00
2 3,000,000.00
7 700,000.00
0 1,300,000.00
0 1,700,000.00
16 2,000,000.00
0 2,300,000.00
0 3,400,000.00
7 6,000,000.00
0 6,000,000.00
0 8,000,000.00
16 11,000,000.00
0 14,000,000.00
0 17,000,000.00
NO URAIAN PEKERJAAN STN
VI LANTAI 4
1 PEKERJAAN FAN COIL UNIT
Pengadaan dan pemasangan Fan Coil Unit, lengkap dengan kabel kotrol, thermostat,
Acesoris dan peralatan bantu
a FCU - 4 - 1, 5 & 6 unit
Service : R. Rapat & R. Kelas
Kapasitas Total : 50.000 BTU/H
Sensible : 30.500 BTU/H
Vol. Udara : 1.882 CFM
Daya Input : 0,37 Kw 380/3/50HZ
Tipe Indoor : Horizontal flow
HARGA TOTAL
VOLUME SATUAN HARGA
Rp Rp
7 8,000,000.00
1 9,600,000.00
1 12,000,000.00
16 16,000,000.00
0 18,000,000.00
0 22,000,000.00
46 2,100,000.00
46 800,000.00
46 1,200,000.00
22,000.00
45 39,000.00
53 41,000.00
16 49,000.00
155 88,500.00
45 18,500.00
55 200,200.00
244,400.00
125 313,300.00
3 32,000,000.00
NO URAIAN PEKERJAAN STN
1 17,000,000.00
2 22,000,000.00
NO URAIAN PEKERJAAN STN
2 Pengadaan dan pemasangan ducting AC suplly dan return dengan PIR panel Duct
Polyisocyanurate, Non CFC, tebal 20 mm density 54 kg/m3, Thermal konductivity
0,0117w/m°C Temperatur bekerja - 60s/d 80 °C, Flame retardan lengkap dengan
acesoris,pengantung &material bantu.
a Pekerjaan Ducting AC Area Lobby & Office
- 400 x 300 PIR 1.4 m2 mtr
- 350 x 300 PIR 1.3 m2 mtr
- 300 x 300 PIR 1.2 m2 mtr
- 300 x 200 PIR 1.0 m2 mtr
- 200 x 200 PIR 0.8 m2 mtr
b Pekerjaan Ducting Toilet tanpa isolasi
- 200 x 200 BJLS 60 0.8 m2 mtr
- 200 x 150 BJLS 60 0.7 m2 mtr
- 150 x 150 BJLS 60 0.6 m2 mtr
c Pekerjaan Ducting Fresh Air ke unit tanpa isolasi
- Ø 150 BJLS 60 0.6 m2 mtr
- Ø 100 BJLS 60 0.4 m2 mtr
3 Pengadaan dan pekerjaan Air Terminal c/w accessories
a Diffuser 300 x 300 c/w spliter damper bh
b Diffuser Floor Type 600 x 600 c/w spliter damper bh
c Diffuser 400 x 200 mm c/w spliter damper bh
d Return Diffuser 400 x 200 mm c/w bok bh
e Spigot dia 200 mm bh
f Flexible Duct c/w isolasi dia. 150 mm mtr
g EAG 150 x 150 mm c/w spliter damper. bh
h Volume damper Ø 100 mm . bh
i Volume damper 150 x 150 mm . bh
j Volume damper 200 x 200 mm . bh
k Drain pant indoor unit berikut hanger bh
l Three-Way Control Valve dia 25 mm bh
m Balancing Valve c/w aksesoris bh
m Gate Valve dia 25 mm bh
n Gate Valve dia 38 mm bh
k Drain pant indoor unit berikut hanger bh
4 Pekerjaan Instalasi Perpipaan & Valve
a Pengadaan dan pekerjaan pipa CHWS &CHWR GIP medium lengkap
dengan isolasi class 1 APDM tebal 20 s/d 25 mm
Dia 1" ( 25 mm ) m
Dia 1 1/8 " ( 28.58 mm ) m
HARGA TOTAL
VOLUME SATUAN HARGA
Rp Rp
665,000.00
617,500.00
3 570,000.00
4 475,000.00
12 380,000.00
160,000.00
140,000.00
120,000.00
120,000.00
3 80,000.00
3 600,000.00
80 1,400,000.00
1 365,000.00
1 365,000.00
4 185,000.00
4 135,000.00
200,000.00
1 280,000.00
425,000.00
475,000.00
1 1,600,000.00
1 6,800,000.00
1 5,500,000.00
6 350,000.00
16 485,000.00
24 1,600,000.00
55 97,000.00
14 98,000.00
NO URAIAN PEKERJAAN STN
6 650,000.00
0 1,100,000.00
0 1,550,000.00
6 1,750,000.00
0 1,880,000.00
0 2,200,000.00
2 3,000,000.00
3 700,000.00
NO URAIAN PEKERJAAN STN
30 22,000.00
45 39,000.00
53 41,000.00
16 49,000.00
155 88,500.00
45 18,500.00
55 200,200.00
244,400.00
125 313,300.00
-
NO URAIAN PEKERJAAN STN
VII LANTAI 5
1 PEKERJAAN FAN COIL UNIT
Pengadaan dan pemasangan Fan Coil Unit, lengkap dengan kabel kotrol, thermostat,
Acesoris dan peralatan bantu
a FCU - 5 - 1 unit
Service : R. Dosen
Kapasitas Total : 24.000 BTU/H
Sensible : 16.320 BTU/H
Vol. Udara : 800 CFM
Daya Input : 0,1 Kw 380/3/50HZ
Tipe Indoor : Horizontal flow
Water flow rate : 0.35 cmh ( dia 25 mm )
entering/leaving : 7 dgre / 12 dgre
b FCU - 5 - 2, 3, 4, 5, 7 & 8 unit
Service : R. Kelas
Kapasitas Total : 50.000 BTU/H
Sensible : 30.500 BTU/H
Vol. Udara : 1.882 CFM
Daya Input : 0,37 Kw 380/3/50HZ
Tipe Indoor : Horizontal flow
Water flow rate : 0.35 cmh ( dia 25 mm )
entering/leaving : 7 dgre / 12 dgre
HARGA TOTAL
VOLUME SATUAN HARGA
Rp Rp
1 15,000,000.00
6 15,000,000.00
NO URAIAN PEKERJAAN STN
c FCU - 5 - 6 unit
Service : R. Kelas
Kapasitas Total : 40.000 BTU/H
Sensible : 24.000 BTU/H
Vol. Udara : 1.059 CFM
Daya Input : 0,25 Kw 380/3/50HZ
Tipe Indoor : Horizontal flow
Water flow rate : 0.35 cmh ( dia 25 mm )
entering/leaving : 7 dgre / 12 dgre
d FCU - 5 - 9, 10, 11 & 12 unit
Service : R. Serbaguna / Aula
Kapasitas Total : 100.000 BTU/H
Sensible : 60.500 BTU/H
Vol. Udara : 2.824 CFM
Daya Input : 0,8 Kw 380/3/50HZ
Tipe Indoor : Horizontal flow
Water flow rate : 0.35 cmh ( dia 25 mm )
entering/leaving : 7 dgre / 12 dgre
2 Pengadaan dan pemasangan ducting AC suplly dan return dengan PIR panel Duct
Polyisocyanurate, Non CFC, tebal 20 mm density 54 kg/m3, Thermal konductivity
0,0117w/m°C Temperatur bekerja - 60s/d 80 °C, Flame retardan lengkap dengan
acesoris,pengantung &material bantu.
a Pekerjaan Ducting AC Area Lobby & Office
- 400 x 300 PIR 1.4 m2 mtr
- 350 x 300 PIR 1.3 m2 mtr
- 300 x 300 PIR 1.2 m2 mtr
- 300 x 200 PIR 1.0 m2 mtr
- 200 x 200 PIR 0.8 m2 mtr
b Pekerjaan Ducting Toilet tanpa isolasi
- 200 x 200 BJLS 60 0.8 m2 mtr
- 200 x 150 BJLS 60 0.7 m2 mtr
- 150 x 150 BJLS 60 0.6 m2 mtr
c Pekerjaan Ducting Fresh Air ke unit tanpa isolasi
- Ø 150 BJLS 60 0.6 m2 mtr
- Ø 100 BJLS 60 0.4 m2 mtr
3 Pengadaan dan pekerjaan Air Terminal c/w accessories
a Diffuser 300 x 300 c/w spliter damper bh
b Diffuser Floor Type 600 x 600 c/w spliter damper bh
c Diffuser 400 x 200 mm c/w spliter damper bh
HARGA TOTAL
VOLUME SATUAN HARGA
Rp Rp
1 15,000,000.00
4 15,000,000.00
665,000.00
617,500.00
3 570,000.00
4 475,000.00
12 380,000.00
160,000.00
140,000.00
120,000.00
120,000.00
3 80,000.00
3 600,000.00
1,400,000.00
1 365,000.00
NO URAIAN PEKERJAAN STN
66 97,000.00
14 98,000.00
45 111,000.00
50 131,000.00
38 131,000.00
30 230,000.00
75 285,000.00
52 504,000.00
40 930,000.00
0 1,368,000.00
0 1,720,000.00
NO URAIAN PEKERJAAN STN
4 650,000.00
0 1,100,000.00
0 1,550,000.00
20 1,750,000.00
0 1,880,000.00
0 2,200,000.00
2 3,000,000.00
2 700,000.00
0 1,300,000.00
0 1,700,000.00
10 2,000,000.00
0 2,300,000.00
0 3,400,000.00
2 6,000,000.00
0 6,000,000.00
0 8,000,000.00
10 11,000,000.00
0 14,000,000.00
0 17,000,000.00
2 8,000,000.00
1 9,600,000.00
1 12,000,000.00
10 16,000,000.00
0 18,000,000.00
0 22,000,000.00
12 2,100,000.00
12 800,000.00
12 1,200,000.00
22,000.00
45 39,000.00
53 41,000.00
16 49,000.00
NO URAIAN PEKERJAAN STN
VIII LANTAI 6
1 PEKERJAAN FAN COIL UNIT
Pengadaan dan pemasangan Fan Coil Unit, lengkap dengan kabel kotrol, thermostat,
Acesoris dan peralatan bantu
a FCU - 6 - 1 unit
Service : R. Dosen
Kapasitas Total : 24.000 BTU/H
Sensible : 16.320 BTU/H
Vol. Udara : 800 CFM
Daya Input : 0,1 Kw 380/3/50HZ
Tipe Indoor : Horizontal flow
Water flow rate : 0.35 cmh ( dia 25 mm )
entering/leaving : 7 dgre / 12 dgre
HARGA TOTAL
VOLUME SATUAN HARGA
Rp Rp
155 88,500.00
45 18,500.00
55 200,200.00
244,400.00
125 313,300.00
1 17,000,000.00
NO URAIAN PEKERJAAN STN
1 22,000,000.00
665,000.00
617,500.00
3 570,000.00
4 475,000.00
12 380,000.00
160,000.00
140,000.00
120,000.00
120,000.00
3 80,000.00
3 600,000.00
1,400,000.00
1 365,000.00
NO URAIAN PEKERJAAN STN
48 97,000.00
16 98,000.00
38 111,000.00
24 131,000.00
24 131,000.00
20 230,000.00
36 285,000.00
10 504,000.00
6 930,000.00
0 1,368,000.00
0 1,720,000.00
NO URAIAN PEKERJAAN STN
4 650,000.00
0 1,100,000.00
0 1,550,000.00
20 1,750,000.00
0 1,880,000.00
0 2,200,000.00
2 3,000,000.00
2 700,000.00
0 1,300,000.00
0 1,700,000.00
10 2,000,000.00
0 2,300,000.00
0 3,400,000.00
2 6,000,000.00
0 6,000,000.00
0 8,000,000.00
10 11,000,000.00
0 14,000,000.00
0 17,000,000.00
2 8,000,000.00
1 9,600,000.00
1 12,000,000.00
10 16,000,000.00
0 18,000,000.00
0 22,000,000.00
12 2,100,000.00
12 800,000.00
12 1,200,000.00
22,000.00
45 39,000.00
53 41,000.00
16 49,000.00
NO URAIAN PEKERJAAN STN
55 200,200.00
244,400.00
125 313,300.00
-
NO URAIAN PEKERJAAN STN
IX LANTAI 7
1 PEKERJAAN FAN COIL UNIT
Pengadaan dan pemasangan Fan Coil Unit, lengkap dengan kabel kotrol, thermostat,
Acesoris dan peralatan bantu
a FCU - 7 - 1 unit
Service : R. Dosen
Kapasitas Total : 24.000 BTU/H
Sensible : 16.320 BTU/H
Vol. Udara : 800 CFM
Daya Input : 0,1 Kw 380/3/50HZ
Tipe Indoor : Horizontal flow
Water flow rate : 0.35 cmh ( dia 25 mm )
entering/leaving : 7 dgre / 12 dgre
b FCU - 7 - 2, 3, 4, 5, 7 & 8 unit
Service : R. Kelas
Kapasitas Total : 50.000 BTU/H
Sensible : 30.500 BTU/H
Vol. Udara : 1.882 CFM
Daya Input : 0,37 Kw 380/3/50HZ
Tipe Indoor : Horizontal flow
Water flow rate : 0.35 cmh ( dia 25 mm )
entering/leaving : 7 dgre / 12 dgre
c FCU - 7 - 6 unit
Service : R. Kelas
Kapasitas Total : 40.000 BTU/H
Sensible : 24.000 BTU/H
Vol. Udara : 1.059 CFM
Daya Input : 0,25 Kw 380/3/50HZ
Tipe Indoor : Horizontal flow
Water flow rate : 0.35 cmh ( dia 25 mm )
entering/leaving : 7 dgre / 12 dgre
2 Pengadaan dan pemasangan ducting AC suplly dan return dengan PIR panel Duct
Polyisocyanurate, Non CFC, tebal 20 mm density 54 kg/m3, Thermal konductivity
0,0117w/m°C Temperatur bekerja - 60s/d 80 °C, Flame retardan lengkap dengan
acesoris,pengantung &material bantu.
a Pekerjaan Ducting AC Area Lobby & Office
- 400 x 300 PIR 1.4 m2 mtr
- 350 x 300 PIR 1.3 m2 mtr
HARGA TOTAL
VOLUME SATUAN HARGA
Rp Rp
1 17,000,000.00
6 32,000,000.00
1 22,000,000.00
665,000.00
617,500.00
NO URAIAN PEKERJAAN STN
160,000.00
140,000.00
120,000.00
120,000.00
3 80,000.00
3 600,000.00
1,400,000.00
1 365,000.00
1 365,000.00
4 185,000.00
4 135,000.00
200,000.00
1 280,000.00
425,000.00
475,000.00
1 1,600,000.00
NO URAIAN PEKERJAAN STN
48 97,000.00
16 98,000.00
38 111,000.00
24 131,000.00
24 131,000.00
20 230,000.00
36 285,000.00
10 504,000.00
6 930,000.00
0 1,368,000.00
0 1,720,000.00
4 650,000.00
0 1,100,000.00
0 1,550,000.00
20 1,750,000.00
0 1,880,000.00
0 2,200,000.00
2 3,000,000.00
2 700,000.00
0 1,300,000.00
0 1,700,000.00
10 2,000,000.00
0 2,300,000.00
0 3,400,000.00
2 6,000,000.00
0 6,000,000.00
0 8,000,000.00
10 11,000,000.00
0 14,000,000.00
0 17,000,000.00
2 8,000,000.00
1 9,600,000.00
NO URAIAN PEKERJAAN STN
22,000.00
45 39,000.00
53 41,000.00
16 49,000.00
155 88,500.00
45 18,500.00
55 200,200.00
244,400.00
125 313,300.00
-
NO URAIAN PEKERJAAN STN
X LANTAI 8
1 PEKERJAAN FAN COIL UNIT
Pengadaan dan pemasangan Fan Coil Unit, lengkap dengan kabel kotrol, thermostat,
Acesoris dan peralatan bantu
a FCU - 8 - 1 unit
Service : R. Dosen
Kapasitas Total : 24.000 BTU/H
Sensible : 16.320 BTU/H
Vol. Udara : 800 CFM
Daya Input : 0,1 Kw 380/3/50HZ
Tipe Indoor : Horizontal flow
Water flow rate : 0.35 cmh ( dia 25 mm )
entering/leaving : 7 dgre / 12 dgre
b FCU - 8 - 2, 3, 4, 5, 7 & 8 unit
Service : R. Kelas
Kapasitas Total : 50.000 BTU/H
Sensible : 30.500 BTU/H
Vol. Udara : 1.882 CFM
Daya Input : 0,37 Kw 380/3/50HZ
Tipe Indoor : Horizontal flow
Water flow rate : 0.35 cmh ( dia 25 mm )
entering/leaving : 7 dgre / 12 dgre
c FCU - 8 - 6 unit
Service : R. Kelas
Kapasitas Total : 40.000 BTU/H
Sensible : 24.000 BTU/H
Vol. Udara : 1.059 CFM
Daya Input : 0,25 Kw 380/3/50HZ
Tipe Indoor : Horizontal flow
Water flow rate : 0.35 cmh ( dia 25 mm )
entering/leaving : 7 dgre / 12 dgre
2 Pengadaan dan pemasangan ducting AC suplly dan return dengan PIR panel Duct
Polyisocyanurate, Non CFC, tebal 20 mm density 54 kg/m3, Thermal konductivity
0,0117w/m°C Temperatur bekerja - 60s/d 80 °C, Flame retardan lengkap dengan
acesoris,pengantung &material bantu.
a Pekerjaan Ducting AC Area Lobby & Office
- 400 x 300 PIR 1.4 m2 mtr
- 350 x 300 PIR 1.3 m2 mtr
HARGA TOTAL
VOLUME SATUAN HARGA
Rp Rp
1 17,000,000.00
6 32,000,000.00
1 22,000,000.00
665,000.00
617,500.00
NO URAIAN PEKERJAAN STN
160,000.00
140,000.00
120,000.00
120,000.00
3 80,000.00
3 600,000.00
1,400,000.00
1 365,000.00
1 365,000.00
4 185,000.00
4 135,000.00
200,000.00
1 280,000.00
425,000.00
475,000.00
1 1,600,000.00
NO URAIAN PEKERJAAN STN
48 97,000.00
16 98,000.00
38 111,000.00
24 131,000.00
24 131,000.00
20 230,000.00
36 285,000.00
10 504,000.00
6 930,000.00
0 1,368,000.00
0 1,720,000.00
4 650,000.00
0 1,100,000.00
0 1,550,000.00
20 1,750,000.00
0 1,880,000.00
0 2,200,000.00
2 3,000,000.00
2 700,000.00
0 1,300,000.00
0 1,700,000.00
10 2,000,000.00
0 2,300,000.00
0 3,400,000.00
2 6,000,000.00
0 6,000,000.00
0 8,000,000.00
10 11,000,000.00
0 14,000,000.00
0 17,000,000.00
2 8,000,000.00
1 9,600,000.00
NO URAIAN PEKERJAAN STN
22,000.00
45 39,000.00
53 41,000.00
16 49,000.00
155 88,500.00
45 18,500.00
55 200,200.00
244,400.00
125 313,300.00
-
NO URAIAN PEKERJAAN STN
XI LANTAI ATAP
1 PEKERJAAN AC KONVENSIONAL AIR COOLED SPLIT
Pengadaan dan pemasangan Air Cooled SPLIT- ( R- 410 A )
lengkap dengan Kable kotrol, thermostat , Acesoris dan peralatan bantu
a OU / IU - RML - 1 & 2 unit
Service : R. Mesin Lift
Kapasitas Total : 19.800 BTU/H
Sensible : 13.450 BTU/H
Vol. Udara : 530 CFM
Daya input : 0,298 IU + 1,740 OU KW 220/1/50 HZ
Tipe Indoor : Wall Mounted c/w remote
Liquid & gas : Dia 6,35 & 12,7 mm
2 PEKERJAAN MEKANIKAL FAN
Pengadaan dan pemasangan INTAKE & EXHAUST FAN
lengka dengan Kable kotrol, Speed Kotrol , Acesoris dan peralatan bantu
a EF - AT - 1 & 2 unit
Service : Servise Toilet lantai Basement s/d lantai 8
Kapasitas Total : 6.745 CFM
Daya input : 2,238 Watt 220 / 1 / 50 HZ
Tipe Fan : Axial Tube Fan Auto Shutter
b PF - AT - 1 unit
Service : Servise Tangga Kebakaran
Kapasitas Total : 6.745 CFM
Daya input : 2,238 Watt 220 / 1 / 50 HZ
Tipe Fan : Axial Tube Fan Auto Shutter
3 PEKERJAAN WATER COOLED CHILLER
Pengadaan dan pemasangan Water Cooled Chiller (R134a) berikut Valve & Acesoris lengkap
dengan Kable kotrol dan peralatan bantu
a CH - 1, 2 & 3 unit
Service : AHU & FCU seluruh lantai
Kapasitas Total : 400 TR
Daya input : 0,57 KW / tr 380/3/50 HZ
Tipe Indoor : Water Cooled Screw (R134a)c/w VSD
Pipa Inlet/Outlet Water : Dia 200 mm
2 19,000,000.00
2 5,000,000.00
2 8,500,000.00
3 1,555,500,000.00
NO URAIAN PEKERJAAN STN
a CT - 1 & 2 unit
Service : Chiller Unit CH-1, 2 & 3
Kapasitas Total : 4 TR
Daya input : 37 KW 380/3/50 HZ
Tipe Indoor : Square Cross Flow
Pipa Inlet/Outlet Water : Dia 200 mm
3 243,000,000.00
NO URAIAN PEKERJAAN STN
1 85,000,000.00
1 160,000,000.00
8 600,000.00
1,400,000.00
4 365,000.00
8 365,000.00
8 185,000.00
3 135,000.00
2 200,000.00
280,000.00
425,000.00
2 475,000.00
2 1,600,000.00
2 6,800,000.00
NO URAIAN PEKERJAAN STN
24 131,000.00
20 230,000.00
36 285,000.00
10 504,000.00
40 930,000.00
50 1,368,000.00
30 1,720,000.00
20 5,000,000.00
NO URAIAN PEKERJAAN STN
2 3,000,000.00
18 8,800,000.00
12 13,000,000.00
2 16,000,000.00
10 4,000,000.00
6 9,800,000.00
12 17,000,000.00
3 77,800,000.00
1 66,500,000.00
26 3,100,000.00
22 800,000.00
9 1,200,000.00
82 460,900.00
68 88,500.00
109 88,500.00
118 88,500.00
28 18,500.00
13 21,000.00
7 21,000.00
200,200.00
244,400.00
90 313,300.00
1 75,000,000.00 22,500,000.00
22,500,000.00
550,502,200.00
VOLUME
NO. URAIAN PEKERJAAN STN
- dia. 25 mm mtr 15
- dia. 32 mm mtr 6
- dia. 40 mm mtr 2
- dia. 50 mm mtr 0
- dia. 65 mm mtr 0
c Accessories
- dia. 20 mm bh 0
- dia. 25 mm bh 0
- dia. 32 mm bh 0
- dia. 40 mm bh 2
- dia. 80 mm bh 4
- dia. 80 mm bh 1
- dia. 100 mm bh 2
- dia. 80 mm bh 0
- dia. 100 mm bh 0
- dia. 150 mm bh 0
18,600 2,083,200
22,250 333,750
34,775 208,650
51,150 102,300
75,625 0
115,750 0
21,525 624,225
23,675 1,112,725
28,375 397,250
21,525 193,725
28,375 198,625
50,500 2,272,500
28,375 681,000
50,500 303,000
79,625 2,388,750
79,625 716,625
173,350 0
212,600 0
337,550 0
462,500 0
601,125 1,202,250
333,900 1,335,600
180,200 180,200
212,000 424,000
180,200 0
212,000 0
320,000 0
5,000,000 5,000,000
NO. URAIAN PEKERJAAN STN VOLUME
NFPA 20 / ULFM
Daya : 156,42 KW
NFPA 20 / ULFM
Daya : 187,7 KW
NFPA 20 / ULFM
Kapasitas : 50 GPM
Daya : 8,4 KW
Sub Total ( 1 )
dia. 40 mm mtr 6
dia. 50 mm mtr 4
NO. URAIAN PEKERJAAN STN VOLUME
d Gate Valve
dia. 40 mm bh 1
dia. 50 mm bh 1
dia. 100 mm bh 4
dia. 150 mm bh 5
NO. URAIAN PEKERJAAN STN VOLUME
e Strainer Valve
dia .50 mm bh 1
dia. 150 mm bh 2
f Check Valve
dia. 40 mm bh 1
dia. 100 mm bh 2
g Flexible Joint
dia. 40 mm bh 1
dia. 50 mm bh 1
dia. 100 mm bh 2
dia. 150 mm bh 2
i Alarm gong bh 1
j Pressure Switch bh 2
k Pressure Gauge bh 1
Sub Total ( 2 )
b Hidrant pilar bh 11
c Siamice Conection bh 1
e Accessories
Sub Total ( 3 )
- dia. 65 mm mtr 0
NO. URAIAN PEKERJAAN STN VOLUME
Sub Total ( 4 )
- dia. 65 mm mtr 93
- dia. 80 mm mtr 23
b Indoor Hydrant Box lengkap dengan nozzel dan Accessories sbb : set 3
Sub Total ( 5 )
- dia. 65 mm mtr 90
- dia. 80 mm mtr 24
b Indoor Hydrant Box lengkap dengan nozzel dan Accessories sbb : set 3
Sub Total ( 6 )
- dia. 65 mm mtr 90
- dia. 80 mm mtr 33
Indoor Hydrant Box lengkap dengan nozzel dan Accessories sbb : set 4
Sub Total ( 7 )
- dia. 65 mm mtr 88
- dia. 80 mm mtr 27
Indoor Hydrant Box lengkap dengan nozzel dan Accessories sbb : set 4
Sub Total ( 8 )
- dia. 65 mm mtr 90
- dia. 80 mm mtr 23
b Indoor Hydrant Box lengkap dengan nozzel dan Accessories sbb : set 4
Sub Total ( 9 )
- dia. 65 mm mtr 14
- dia. 80 mm mtr 0
b Indoor Hydrant Box lengkap dengan nozzel dan Accessories sbb : set 1
Sub Total ( 10 )
- dia. 65 mm mtr 14
- dia. 80 mm mtr 0
b Indoor Hydrant Box lengkap dengan nozzel dan Accessories sbb : set 1
Sub Total ( 11 )
- dia. 65 mm mtr 14
- dia. 80 mm mtr 0
b Indoor Hydrant Box lengkap dengan nozzel dan Accessories sbb : set 1
Sub Total ( 12 )
- dia. 65 mm mtr 14
- dia. 80 mm mtr 0
b Indoor Hydrant Box lengkap dengan nozzel dan Accessories sbb : set 1
Sub Total ( 13 )
NO. URAIAN PEKERJAAN STN VOLUME
- dia. 65 mm mtr 14
- dia. 80 mm mtr 0
b Indoor Hydrant Box lengkap dengan nozzel dan Accessories sbb : set 1
Sub Total ( 14 )
Sub Total ( 1 )
- dia. 32 mm mtr 72
- dia. 40 mm mtr 31
- dia. 50 mm mtr 22
- dia. 65 mm mtr 13
- dia. 80 mm mtr 43
Sub Total ( 2 )
- dia. 32 mm mtr 60
- dia. 40 mm mtr 86
- dia. 50 mm mtr 67
- dia. 65 mm mtr 18
- dia. 80 mm mtr 27
Sub Total ( 3 )
- dia. 50 mm mtr 43
- dia. 65 mm mtr 52
- dia. 80 mm mtr 62
Sub Total ( 4 )
- dia. 40 mm mtr 80
- dia. 50 mm mtr 58
- dia. 65 mm mtr 80
- dia. 80 mm mtr 55
NO. URAIAN PEKERJAAN STN VOLUME
Sub Total ( 5 )
NO. URAIAN PEKERJAAN STN VOLUME
- dia. 50 mm mtr 45
- dia. 80 mm mtr 36
Sub Total ( 6 )
- dia. 32 mm mtr 33
- dia. 40 mm mtr 14
- dia. 50 mm mtr 12
- dia. 65 mm mtr 59
- dia. 80 mm mtr 4
Sub Total ( 7 )
NO. URAIAN PEKERJAAN STN VOLUME
- dia. 32 mm mtr 36
- dia. 40 mm mtr 14
- dia. 50 mm mtr 16
- dia. 65 mm mtr 54
- dia. 80 mm mtr 4
NO. URAIAN PEKERJAAN STN VOLUME
Sub Total ( 8 )
- dia. 32 mm mtr 36
- dia. 40 mm mtr 14
- dia. 50 mm mtr 16
- dia. 65 mm mtr 54
- dia. 80 mm mtr 4
Sub Total ( 9 )
- dia. 32 mm mtr 36
- dia. 40 mm mtr 14
- dia. 50 mm mtr 16
- dia. 65 mm mtr 54
- dia. 80 mm mtr 4
Sub Total ( 10 )
NO. URAIAN PEKERJAAN STN VOLUME
- dia. 32 mm mtr 36
- dia. 40 mm mtr 14
- dia. 50 mm mtr 16
- dia. 65 mm mtr 54
- dia. 80 mm mtr 4
Sub Total ( 11 )
1 Lantai Basement 2
FE kap. 6 kg bh 6
FE kap. 10 kg bh 0
Sub Total ( 1 )
2 Lantai Basement 1
FE kap. 6 kg bh 10
FE kap. 10 kg bh 0
Sub Total ( 2 )
3 Lantai Ground
Sub Total ( 3 )
4 Lantai 2
FE kap. 6 kg bh 13
FE kap. 10 kg bh 0
Sub Total ( 4 )
5 Lantai 3
FE kap. 5 kg bh 14
FE kap. 10 kg bh 0
Sub Total ( 5 )
NO. URAIAN PEKERJAAN STN VOLUME
6 Lantai 4
FE kap. 5 kg bh 5
FE kap. 10 kg bh 0
Sub Total ( 6 )
7 Lantai 5
FE kap. 5 kg bh 5
FE kap. 10 kg bh 0
Sub Total ( 7 )
8 Lantai 6
FE kap. 5 kg bh 5
FE kap. 10 kg bh 0
Sub Total ( 8 )
9 Lantai 7
FE kap. 5 kg bh 5
FE kap. 10 kg bh 1
Sub Total ( 9 )
10 Lantai 8
FE kap. 5 kg bh 5
FE kap. 10 kg bh 1
Sub Total ( 10 )
450,000,000 450,000,000
750,000,000 750,000,000
50,000,000 50,000,000
5,000,000 5,000,000
10,000,000 10,000,000
1,265,000,000
7,500,000 7,500,000
74,525 447,150
97,775 391,100
TOTAL
HARGA
SATUAN HARGA
Rp Rp
275,500 2,755,000
479,350 3,834,800
771,950 67,931,600
46,150 3,322,800
1,750,000 1,750,000
1,750,000 1,750,000
8,498,675 33,994,700
12,265,550 61,327,750
TOTAL
HARGA
SATUAN HARGA
Rp Rp
4,699,250 4,699,250
2,437,500 4,875,000
2,500,000 2,500,000
3,534,800 7,069,600
359,600 359,600
405,800 405,800
1,250,000 2,500,000
1,900,000 3,800,000
20,000,000 20,000,000
2,675,000 2,675,000
2,687,500 5,375,000
1,275,000 1,275,000
240,539,150
4,200,000 46,200,000
4,400,000 48,400,000
4,400,000 4,400,000
330,675 420,618,600
575,275 274,406,175
3,500,000 38,500,000
3,500,000 3,500,000
8,000,000 8,000,000
844,024,775
151,100 -
TOTAL
HARGA
SATUAN HARGA
Rp Rp
275,500 11,846,500
479,350 -
1,500,000 1,500,000
13,346,500
151,100 14,052,300
196,100 4,510,300
275,500 1,377,500
TOTAL
HARGA
SATUAN HARGA
Rp Rp
9,500,000 28,500,000
5,000,000 5,000,000
53,440,100
151,100 13,599,000
196,100 4,706,400
275,500 1,377,500
9,500,000 28,500,000
5,000,000 5,000,000
39,583,900
151,100 13,599,000
196,100 6,471,300
275,500 1,377,500
9,500,000 38,000,000
5,000,000 5,000,000
64,447,800
151,100
196,100
275,500
9,500,000
TOTAL
HARGA
SATUAN HARGA
Rp Rp
5,000,000
151,100
196,100
275,500
9,500,000
5,000,000
151,100
196,100
275,500
9,500,000
5,000,000
151,100
196,100
275,500
9,500,000
5,000,000
TOTAL
HARGA
SATUAN HARGA
Rp Rp
151,100
196,100
275,500
9,500,000
5,000,000
151,100
196,100
275,500
9,500,000
5,000,000
-
TOTAL
HARGA
SATUAN HARGA
Rp Rp
151,100
196,100
275,500
9,500,000
5,000,000
2,520,382,225
275,500 11,846,500
151,100 6,497,300
18,343,800
50,000 5,300,000
48,850 19,051,500
63,500 4,572,000
74,525 2,310,275
97,775 2,151,050
151,100 1,964,300
196,100 8,432,300
275,500 11,846,500
9,000,000 9,000,000
TOTAL
HARGA
SATUAN HARGA
Rp Rp
64,627,925
50,000 8,000,000
48,850 23,887,650
63,500 3,810,000
74,525 6,409,150
97,775 6,550,925
151,100 2,719,800
196,100 5,294,700
275,500 7,714,000
479,350 15,339,200
TOTAL
HARGA
SATUAN HARGA
Rp Rp
9,000,000 9,000,000
88,725,425
50,000 10,750,000
48,850 33,169,150
63,500 8,382,000
74,525 10,731,600
97,775 4,204,325
151,100 7,857,200
196,100 12,158,200
275,500 9,091,500
9,000,000 9,000,000
105,343,975
50,000
48,850
63,500
74,525
97,775
151,100
196,100
TOTAL
HARGA
SATUAN HARGA
Rp Rp
275,500
9,000,000
-
TOTAL
HARGA
SATUAN HARGA
Rp Rp
50,000
48,850
63,500
74,525
97,775
151,100
196,100
275,500
9,000,000
50,000
48,850
63,500
74,525
97,775
151,100
196,100
9,000,000
-
TOTAL
HARGA
SATUAN HARGA
Rp Rp
50,000
48,850
63,500
74,525
97,775
151,100
196,100
TOTAL
HARGA
SATUAN HARGA
Rp Rp
9,000,000
50,000
48,850
63,500
74,525
97,775
151,100
196,100
7,700,000
50,000
48,850
63,500
74,525
97,775
151,100
196,100
7,700,000
TOTAL
HARGA
SATUAN HARGA
Rp Rp
-
TOTAL
HARGA
SATUAN HARGA
Rp Rp
50,000
48,850
63,500
74,525
97,775
151,100
196,100
7,700,000
277,041,125
1,500,000 9,000,000
2,500,000 -
9,000,000
1,500,000 15,000,000
2,500,000 -
15,000,000
1,500,000 15,000,000
2,500,000 -
12,000,000 12,000,000
TOTAL
HARGA
SATUAN HARGA
Rp Rp
27,000,000
1,500,000
2,500,000 -
1,500,000
2,500,000 -
-
TOTAL
HARGA
SATUAN HARGA
Rp Rp
1,500,000
2,500,000 -
1,500,000
2,500,000 -
1,500,000
2,500,000 -
1,500,000
2,500,000
1,500,000
2,500,000
51,000,000
55,000,000 55,000,000
2,903,423,350
NO URAIAN PEKERJAAN SAT VOLUME
2 Instalasi Listrik
a Instalasi penerangan dan stop kontak dengan
kabel NYM 3 x 2.5 mm2 (o) PVC dia. 3/4 "
- Instalasi penerangan ttk 260
- Instalasi stop kontak 10 A 1p ttk 28
peralatan bantu
- NYY 4x16 mm2 + BC dari LVMDP-1 ke DP - B2 mtr 65
- NYY 4x4 mm2 + BC mm2 dari DP - B2 ke PP-VAC-B2 mtr 10
- NYY 4x4 mm2 + BC mm2 mm2 dari DP - B2 ke PP-EQ mtr 10
- NYY 7x NYY 1x240 mm2 + BC dari LVMDP-2 ke DP-MESIN/B2 mtr 66
- NYY 4x70 mm2 + BC mm2 dari DP-MESIN/B2 ke PP-MESIN 1 mtr 23
- NYY 4x70 mm2 + BC mm2 dari DP-MESIN/B2 ke PP-MESIN 2 mtr 60
- NYY 4x70 mm2 + BC mm2 dari DP-MESIN/B2 ke PP-MESIN 3 mtr 35
- NYY 4x70 mm2 + BC mm2 dari DP-MESIN/B2 ke PP-MESIN 4 mtr 25
- NYY 4x70 mm2 + BC mm2 dari DP-MESIN/B2 ke PP-MESIN 5 mtr 59
- NYY 4x70 mm2 + BC mm2 dari DP-MESIN/B2 ke PP-MESIN 6 mtr 63
NO URAIAN PEKERJAAN SAT VOLUME
Ke Penjumlahan
2 Instalasi Listrik
a Instalasi penerangan dan stop kontak dengan
kabel NYM 3 x 2.5 mm2 (o) PVC dia. 3/4 "
- Instalasi penerangan ttk 311
- Instalasi stop kontak 10 A 1p ttk 43
3 Pengadaan dan Pemasangan Panel lengkap dengan
Peralatan Bantu
- LVMDP-1 unit 1
- LVMDP-2 unit 1
- DP - B1 unit 1
NO URAIAN PEKERJAAN SAT VOLUME
- PP - VAC-B1 unit 1
- DP - MESIN/B1 unit 1
- PP - MESIN 1 unit 1
- PP - MESIN 2 unit 1
- PP - MESIN 3 unit 1
4 Kabel Feeder
Pengadaan dan Pemasangan Kabel Feeder lengkap dengan
peralatan bantu
- NYY 21 x 1 x 300 mm2 dari sisi sekunder Trafo ke LVMDP-1 mtr 20
- NYY 21 x 1 x 300 mm2 dari sisi sekunder Trafo ke LVMDP-2 mtr 30
- NYY 4x16 mm2 + BC mm2 dari LVMDP-1 ke DP - B1 mtr 59
- NYY 4x6 mm2 + BC dari DP - B1 ke PP-VAC-B1 mtr 10
- NYY 4 x 1 x 240 mm2 dari LVMDP-2 ke DP-MESIN/B1 mtr 60
- NYY 4x70 mm2 + BC dari DP-MESIN/B1 ke PP-MESIN 1 mtr 33
- NYY 4x70 mm2 + BC dari DP-MESIN/B1 ke PP-MESIN 2 mtr 47
- NYY 4x70 mm2 + BC dari DP-MESIN/B1 ke PP-MESIN 3 mtr 53
NO URAIAN PEKERJAAN SAT VOLUME
Ke Penjumlahan
2 Instalasi Listrik
a Instalasi penerangan dan stop kontak dengan
kabel NYM 3 x 2.5 mm2 (o) PVC dia. 3/4 "
- Instalasi penerangan ttk 445
- Instalasi stop kontak 10 A 1p ttk 116
3 Pengadaan dan Pemasangan Panel lengkap dengan
Peralatan Bantu
NO URAIAN PEKERJAAN SAT VOLUME
- DP-D unit 1
- LP-D/1 unit 1
- LP-D/2 unit 1
- LP-D/3 unit 1
- PP - VAC - D/1 unit 1
- PP - VAC - D/2 unit 1
- PP - VAC - D/3 unit 1
4 Kabel Feeder
Pengadaan dan Pemasangan Kabel Feeder lengkap dengan
peralatan bantu
- NYY 4x1x240 mm2 + BC dari LVMDP-1 ke DP - D mtr 65
- NYY 4x6 mm2 + BC dari DP - D ke LP-D/1 mtr 64
- NYY 4x6 mm2 + BC dari DP - D ke LP-D/2 mtr 31
- NYY 4x6 mm2 + BC dari DP - D ke LP-D/3 mtr 15
- NYY 4x4 mm2 + BC dari DP - D ke PP-VAC-D/1 mtr 69
- NYY 4x4 mm2 + BC dari DP - D ke PP-VAC-D/2 mtr 35
NO URAIAN PEKERJAAN SAT VOLUME
Ke Penjumlahan
457,000 14,624,000
545,500 108,009,000
315,000 945,000
190,000 3,420,000
330,000 2,970,000
1,130,000 -
65,000 1,820,000
65,000 -
65,000 -
65,000 195,000
65,000 2,080,000
65,000 260,000
225,000 58,500,000
250,000 7,000,000
11,250,000 11,250,000
2,800,000 2,800,000
2,500,000 2,500,000
42,565,000 42,565,000
43,650,000 43,650,000
43,650,000 43,650,000
43,650,000 43,650,000
43,650,000 43,650,000
43,650,000 43,650,000
43,650,000 43,650,000
HARGA TOTAL
SATUAN HARGA
Rp Rp
105,000 6,825,000
38,000 380,000
38,000 380,000
2,057,000 135,762,000
390,000 8,970,000
390,000 23,400,000
390,000 13,650,000
390,000 9,750,000
390,000 23,010,000
390,000 24,570,000
HARGA TOTAL
SATUAN HARGA
Rp Rp
250,000
225,000
253,500
310,800
368,200
Ke Penjumlahan 767,535,000
457,000 24,221,000
545,500 119,464,500
315,000 -
630,000 3,150,000
190,000 3,040,000
190,000 1,140,000
330,000 3,960,000
1,130,000 -
65,000 2,795,000
65,000 -
65,000 -
65,000 325,000
65,000 2,535,000
65,000 -
225,000 69,975,000
250,000 10,750,000
838,000,000 838,000,000
964,000,000 964,000,000
17,300,000 17,300,000
HARGA TOTAL
SATUAN HARGA
Rp Rp
3,500,000 3,500,000
32,195,000 32,195,000
43,650,000 43,650,000
43,650,000 43,650,000
43,650,000 43,650,000
7,562,500 151,250,000
7,562,500 226,875,000
105,000 6,195,000
50,500 505,000
1,199,000 71,940,000
390,000 12,870,000
390,000 18,330,000
390,000 20,670,000
HARGA TOTAL
SATUAN HARGA
Rp Rp
255,000 29,580,000
215,000 13,330,000
215,000 22,145,000
225,000 -
253,500 -
310,800 27,350,400
368,200 -
Ke Penjumlahan 2,828,340,900
971,000 43,695,000
457,000 28,791,000
545,500 137,466,000
315,000 -
190,000 6,080,000
190,000 7,600,000
330,000 4,620,000
300,000 13,200,000
1,130,000 -
65,000 7,540,000
65,000 -
65,000 -
65,000 390,000
65,000 3,770,000
65,000 455,000
225,000 100,125,000
250,000 29,000,000
HARGA TOTAL
SATUAN HARGA
Rp Rp
20,100,000 20,100,000
3,600,000 3,600,000
4,365,000 4,365,000
10,450,000 10,450,000
3,500,000 3,500,000
3,500,000 3,500,000
3,500,000 3,500,000
1,199,000 77,935,000
50,500 3,232,000
50,500 1,565,500
50,500 757,500
38,000 2,622,000
38,000 1,330,000
HARGA TOTAL
SATUAN HARGA
Rp Rp
38,000 570,000
225,000 -
253,500 -
310,800 59,052,000
368,200 9,205,000
Ke Penjumlahan 544,321,000
Ke Penjumlahan
55,000,000.00 55,000,000.00
250,000,000.00 500,000,000.00
590,000,000.00 1,180,000,000.00
135,000.00 6,750,000.00
57,000.00 1,425,000.00
4,500,000.00 9,000,000.00
5,500,000.00 5,500,000.00
5,000,000.00 5,000,000.00
Ke Penjumlahan 1,762,675,000.00
Ke Penjumlahan
885,000,000.00 1,770,000,000.00
375,000,000.00 375,000,000.00
22,500,000.00 22,500,000.00
4,500,000.00 9,000,000.00
22,500,000.00 22,500,000.00
75,000,000.00 150,000,000.00
65,000,000.00 130,000,000.00
2,150,000.00 4,300,000.00
95,000,000.00 95,000,000.00
5,500,000.00 5,500,000.00
5,000,000.00 10,000,000.00
50,000,000.00 50,000,000.00
Ke Penjumlahan 2,643,800,000.00
I PERALATAN UTAMA
- JB-FA unit 7
- Annunciator unit 1
Sub Total I
II Lantai BASEMENT 2
NYA 2(1 x 1,5 mm2) dalam PVC Conduit dia.3 / 4" titik 82
Sub Total II
NYA 2(1 x 1,5 mm2) dalam PVC Conduit dia.3 / 4" titik 95
IV Lantai DASAR
Sub Total IV
165,000,000 165,000,000
450,000 3,150,000
65,000,000 65,000,000
233,150,000
450,000 32,400,000
250,000 250,000
215,000 645,000
175,000 525,000
100,000 300,000
150,000 12,300,000
225,000 675,000
47,095,000
450,000 36,900,000
250,000 250,000
215,000 860,000
175,000 700,000
100,000 400,000
HARGA TOTAL
SATUAN HARGA
Rp Rp
150,000 14,250,000
225,000 900,000
54,260,000
HARGA TOTAL
SATUAN HARGA
Rp Rp
450,000 46,800,000
250,000 250,000
215,000 860,000
175,000 700,000
100,000 400,000
150,000 17,550,000
225,000 900,000
67,460,000
7,500,000 7,500,000
409,465,000
NO. URAIAN PEKERJAAN STN VOLUME
I PERALATAN UTAMA
1 Operator Consule buah 1
2 Main Distribution Frame (MDF-TP)
Kapasitas 100 '' lengkap dengan
arresster untuk setiap line telepon unit 1
3 Sentral Telepon (PABX) kap. 14 PTT/140
ext. dengan fasilitas sesuai spesifikasi di
lengkapi back up battery minimal 2 jam unit 1
4 Instalasi dari Terminal BoxTelekom
ke MDFTP dengan OTC Cat 20 x 2 x 0,6 mm2 lot 1
5 Management, Accounting Aplications lot 1
6 JB-TP unit 7
6 Perijinan Penyambungan ke TELKOM 14 line Telepon lot 1
Sub Total I
II Lantai Basement 2
1 Outlet telepon 4 way , 4 contac buah 22
2 Pesawat Telephon IP Standard buah 0
3 Pesawat Telepon standard single line buah 22
4 Pesawat Fax type plain paper buah 0
5 Instalasi dgn ITC 2 x 2 x 0.6 mm2 dlm PVC dia. 3/4"
lengkap dengan peralatan bantu ttk 22
6 Cable Tray 200 mm2 mtr 80
7 Cable Tray 300 mm2 mtr 10
Sub Total II
IV Lantai Dasar
1 Outlet telepon 4 way , 4 contac buah 25
2 Pesawat Telephon IP Standard buah 0
3 Pesawat Telepon standard single line buah 25
4 Pesawat Fax type plain paper buah 0
5 Instalasi dgn ITC 2 x 2 x 0.6 mm2 dlm PVC dia. 3/4"
lengkap dengan peralatan bantu ttk 25
6 Cable Tray 200 mm2 mtr 79
7 Cable Tray 300 mm2 mtr 10
Sub Total IV
NO. URAIAN PEKERJAAN STN VOLUME
V Lantai 2
1 Outlet telepon 4 way , 4 contac buah 28
2 Pesawat Telephon IP Standard buah 0
3 Pesawat Telepon standard single line buah 28
4 Pesawat Fax type plain paper buah 0
5 Instalasi dgn ITC 2 x 2 x 0.6 mm2 dlm PVC dia. 3/4"
lengkap dengan peralatan bantu ttk 28
6 Cable Tray 200 mm2 mtr 79
7 Cable Tray 300 mm2 mtr 10
Sub Total V
VI Lantai 3
1 Outlet telepon 4 way , 4 contac buah 26
2 Pesawat Telephon IP Standard buah 0
3 Pesawat Telepon standard single line buah 26
4 Pesawat Fax type plain paper buah 0
5 Instalasi dgn ITC 2 x 2 x 0.6 mm2 dlm PVC dia. 3/4"
lengkap dengan peralatan bantu ttk 26
6 Cable Tray 200 mm2 mtr 79
7 Cable Tray 300 mm2 mtr 10
Sub Total VI
VII Lantai 4
1 Outlet telepon 4 way , 4 contac buah 9
2 Pesawat Telephon IP Standard buah 0
3 Pesawat Telepon standard single line buah 9
4 Pesawat Fax type plain paper buah 0
5 Instalasi dgn ITC 2 x 2 x 0.6 mm2 dlm PVC dia. 3/4"
lengkap dengan peralatan bantu ttk 9
6 Cable Tray 200 mm2 mtr 79
7 Cable Tray 300 mm2 mtr 10
VIII Lantai 5
1 Outlet telepon 4 way , 4 contac buah 8
NO. URAIAN PEKERJAAN STN VOLUME
Sub Total IX
X KABEL FEEDER
Sub Total X
5,000,000 5,000,000
7,500,000 7,500,000
225,000,000 225,000,000
4,500,000 4,500,000
7,500,000 7,500,000
450,000 3,150,000
24,000,000 24,000,000
276,650,000
65,000 1,430,000
1,750,000 0
350,000 7,700,000
1,250,000 0
225,000 4,950,000
150,000 12,000,000
165,000 1,650,000
27,730,000
65,000 1,300,000
1,750,000 0
350,000 7,000,000
1,250,000 0
225,000 4,500,000
150,000 11,700,000
165,000 1,650,000
HARGA TOTAL
SATUAN HARGA
Rp Rp
26,150,000
65,000 1,625,000
1,750,000 0
350,000 8,750,000
1,250,000 0
225,000 5,625,000
150,000 11,850,000
165,000 1,650,000
29,500,000
HARGA TOTAL
SATUAN HARGA
Rp Rp
65,000
1,750,000
350,000
1,250,000
225,000
150,000
165,000
65,000
1,750,000
350,000
1,250,000
225,000
150,000
165,000
65,000
1,750,000
350,000
1,250,000
225,000
150,000
165,000
65,000
HARGA TOTAL
SATUAN HARGA
Rp Rp
1,750,000
350,000
1,250,000
225,000
150,000
165,000
0
HARGA TOTAL
SATUAN HARGA
Rp Rp
65,000
1,750,000
350,000
1,250,000
225,000
150,000
165,000
175,000 1,750,000
175,000 3,150,000
225,000 5,850,000
175,000 5,950,000
175,000 7,350,000
150,000 7,200,000
150,000 8,400,000
150,000 8,400,000
150,000 8,400,000
48,050,000
3,500,000 3,500,000
5,000,000 5,000,000
416,580,000
NO. URAIAN PEKERJAAN STN VOLUME
Sub Total I
a. Lantai Basement 2
- Coloum Speaker 10 Watt buah 0
- Ceiling Speaker 3 Watt buah 72
- Volume Control 6 Watt buah 0
a. Lantai Basement 1
- Coloum Speaker 10 Watt buah 0
- Ceiling Speaker 3 Watt buah 82
- Volume Control 6 Watt buah 0
b. Lantai Dasar
- Ceiling Speaker 6 Watt dapat ditapping 3 Watt buah 104
- Volume Control 6 Watt buah 0
c. Lantai 2
- Ceiling Speaker 6 Watt dapat ditapping 3 Watt buah 100
- Volume Control 6 Watt buah 0
d. Lantai 3
- Ceiling Speaker 6 Watt dapat ditapping 3 Watt buah 106
- Volume Control 6 Watt buah 0
e. Lantai 4
- Ceiling Speaker 6 Watt dapat ditapping 3 Watt buah 48
- Volume Control 6 Watt buah 0
NO. URAIAN PEKERJAAN STN VOLUME
f. Lantai 5
- Ceiling Speaker 6 Watt dapat ditapping 3 Watt buah 59
- Volume Control 6 Watt buah 0
g. Lantai 6 ( Typical s/d Lantai 8 )
- Ceiling Speaker 6 Watt dapat ditapping 3 Watt buah 102
- Volume Control 6 Watt buah 0
Sub Total II
NO. URAIAN PEKERJAAN STN VOLUME
a. Lantai Basement 2
- Coloum Speaker 10 Watt titik 0
- Ceiling Speaker 3 Watt titik 72
- Volume Control 6 Watt titik 0
b. Lantai Basement 1
- Coloum Speaker 10 Watt titik 0
- Ceiling Speaker 3 Watt titik 82
- Volume Control 6 Watt titik 0
c. Lantai Dasar
- Ceiling Speaker 6 Watt dapat ditapping 3 Watt buah 36
- Volume Control 6 Watt buah 5
d. Lantai 2
- Ceiling Speaker 3 Watt titik 100
- Volume Control 6 Watt titik 0
e. Lantai 3
- Ceiling Speaker 3 Watt titik 106
- Volume Control 6 Watt titik 0
f. Lantai 4
- Ceiling Speaker 3 Watt titik 48
- Volume Control 6 Watt titik 0
g. Lantai 5
- Ceiling Speaker 3 Watt titik 59
- Volume Control 6 Watt titik 0
g. Lantai 6 ( Typical s/d :antai 8 )
- Ceiling Speaker 3 Watt titik 102
- Volume Control 6 Watt titik 0
IV Kabel Feeder
Sub Total IV
7,500,000 7,500,000
6,500,000 32,500,000
4,500,000 4,500,000
1,750,000 1,750,000
7,500,000 7,500,000
2,500,000 2,500,000
3,500,000 3,500,000
450,000 3,150,000
15,000,000 15,000,000
77,900,000
1,125,000 0
550,000 39,600,000
450,000 0
1,125,000 0
550,000 45,100,000
450,000 0
550,000 57,200,000
450,000 0
550,000
450,000
550,000
450,000
550,000
450,000
HARGA TOTAL
SATUAN HARGA
RP RP
550,000
450,000
550,000
450,000
141,900,000
HARGA TOTAL
SATUAN HARGA
RP RP
215,000 0
215,000 15,480,000
215,000 0
215,000 0
215,000 17,630,000
215,000 0
550,000 19,800,000
450,000 2,250,000
215,000
215,000
215,000
215,000
215,000
215,000
215,000
215,000
215,000
215,000
55,160,000
150,000 1,500,000
150,000 2,700,000
150,000 3,900,000
150,000 5,100,000
HARGA TOTAL
SATUAN HARGA
RP RP
150,000 6,300,000
150,000 7,500,000
150,000 8,700,000
150,000 9,600,000
150,000 10,800,000
56,100,000
3,500,000 3,500,000
334,560,000
NO. URAIAN PEKERJAAN STN VOLUME
Sub Total I
II Lantai Basement 1
a Unit Terminal
Outlet RG 45 + Face Plate bh 18
b Instalasi Kabel Data
Instalasi data dengan mengunakan kabel UTP Cat
5 cable 4 pair dalam pipa konduit PVC 20 mm ttk 18
c Sistem Administrasi
Rack 19" tipe 12 U bh 1
Patch Panel 34 porth bh 1
Peralatan bantu termasuk patch cord, connector,
coupling jumper dll lot 1
Sub Total II
IV Lantai 2
a Unit Terminal
Outlet RG 45 + Face Plate bh 26
b Instalasi Kabel Data
Instalasi data dengan mengunakan kabel UTP Cat
5 cable 4 pair dalam pipa konduit PVC 20 mm ttk 26
c Sistem Administrasi
Rack 19" tipe 12 U bh 1
Patch Panel 24 porth bh 2
Peralatan bantu termasuk patch cord, connector,
coupling jumper dll lot 1
Sub Total IV
V Lantai 3
a Unit Terminal
Outlet RG 45 + Face Plate bh 25
b Instalasi Kabel Data
Instalasi data dengan mengunakan kabel UTP Cat
5 cable 4 pair dalam pipa konduit PVC 20 mm ttk 25
c Sistem Administrasi
Rack 19" tipe 12 U bh 1
Patch Panel 24 porth bh 2
Peralatan bantu termasuk patch cord, connector,
coupling jumper dll lot 1
Sub Total V
VI Lantai 4
a Unit Terminal
Outlet RG 45 + Face Plate bh 9
b Instalasi Kabel Data
Instalasi data dengan mengunakan kabel UTP Cat
5 cable 4 pair dalam pipa konduit PVC 20 mm ttk 9
c Sistem Administrasi
Rack 19" tipe 12 U bh 1
NO. URAIAN PEKERJAAN STN VOLUME
Sub Total VI
NO. URAIAN PEKERJAAN STN VOLUME
VII Lantai 5
a Unit Terminal
Outlet RG 45 + Face Plate bh 8
b Instalasi Kabel Data
Instalasi data dengan mengunakan kabel UTP Cat
5 cable 4 pair dalam pipa konduit PVC 20 mm ttk 8
c Sistem Administrasi
Rack 19" tipe 12 U bh 1
Patch Panel 24 porth bh 1
Peralatan bantu termasuk patch cord, connector,
coupling jumper dll lot 1
Sub Total IX
X KABEL FEEDER
Kabel Feeder UTP Cat 6 4 pair dalam pipa konduit PVC 20 mm lot 1
2 Jalur
NO. URAIAN PEKERJAAN STN VOLUME
Sub Total X
Sub Total XI
112,500 2,250,000
450,000 9,000,000
4,082,400 4,082,400
690,300 690,300
1,800,000 1,800,000
17,822,700
112,500 2,025,000
450,000 8,100,000
4,082,400 4,082,400
690,300 690,300
1,800,000 1,800,000
16,697,700
112,500 2,700,000
HARGA TOTAL
SATUAN HARGA
Rp Rp
450,000 10,800,000
4,082,400 4,082,400
690,300 690,300
1,800,000 1,800,000
20,072,700
HARGA TOTAL
SATUAN HARGA
Rp Rp
112,500
450,000
4,082,400
690,300
1,800,000
112,500
450,000
4,082,400
690,300
1,800,000
112,500
450,000
4,082,400
HARGA TOTAL
SATUAN HARGA
Rp Rp
690,300
1,800,000
0
HARGA TOTAL
SATUAN HARGA
Rp Rp
112,500
450,000
4,082,400
690,300
1,800,000
112,500
450,000
4,082,400
690,300
1,800,000
1,500,000 1,500,000
1,500,000
1,350,000 1,350,000
HARGA TOTAL
SATUAN HARGA
Rp Rp
1,350,000
1,350,000 1,350,000
1,350,000
58,793,100
NO. URAIAN PEKERJAAN STN VOLUME
Sub Total I
II PERALATAN CCTV
Sub Total II
III INSTALASI
Instalasi Camera dengan Coaxial Cable RG 11, dan
NYM 2 x 1.5 mm2 dalam pipa Conduit dia. 3/4" lot 50
IV MATERIAL BANTU
( Bracket, Kabel Control, Back Up Battery 1kva
Sub Total IV
64,000,000 256,000,000
7,500,000 7,500,000
7,500,000 37,500,000
301,000,000
1,400,000 -
1,700,000 6,800,000
1,400,000 -
1,700,000 10,200,000
1,400,000 -
1,700,000 15,300,000
31,000,000 -
1,400,000 -
1,700,000
1,400,000
1,700,000
1,400,000
1,700,000
1,400,000
1,700,000
1,400,000
HARGA TOTAL
SATUAN HARGA
Rp Rp
1,700,000
32,300,000
750,000 37,500,000
37,500,000
12,500,000 12,500,000
12,500,000
5,000,000 5,000,000
388,300,000
NO. URAIAN PEKERJAAN STN VOLUME
Kapasitas : 2000 kg
Kecepatan : 60 mpm
Kecepatan : 90 mpm
Kecepatan : 60 mpm
915,900,000 915,900,000
575,000,000 1,150,000,000
475,000,000 475,000,000
HARGA TOTAL
SATUAN HARGA
Rp RP
50,000,000 200,000,000
65,000,000 65,000,000
2,805,900,000
NO. URAIAN PEKERJAAN STN VOLUME
1 Pekerjaan Persiapan
Pekerjaan persiapan ls 1
Sub Total ( 1 )
Daya : 5,5 KW
Head : 250 m
Sub Total ( 2 )
b Bak Kontrol bh 1
Sub Total ( 3 )
4 Pekerjaan elektrikal
b Kabel NYYHY 3x1,5 mm2 dari panel kontrol ke WLC di Ground tank m 100
Sub Total ( 4 )
Sub Total ( 5 )
12,495,000 12,495,000
5,145,000 5,145,000
17,640,000
4,725,000 4,725,000
367,500 53,287,500
367,500 20,212,500
5,145,000 5,145,000
367,500 367,500
808,500 808,500
3,228,120 3,228,120
1,984,500 5,953,500
204,330 11,238,150
355,740 19,565,700
525,000 81,375,000
3,675,000 3,675,000
1,249,500 1,249,500
29,400 2,646,000
367,500 33,075,000
514,500 514,500
9,555,000 9,555,000
3,675,000 3,675,000
49,392,000 49,392,000
309,688,470
HARGA TOTAL
SATUAN HARGA
Rp Rp
204,350 21,048,050
367,500 367,500
2,075,798 4,151,596
808,500 808,500
26,375,646
69,090 6,909,000
29,400 2,940,000
661,500 661,500
10,510,500
12,495,000 12,495,000
12,495,000
376,707,555