I PEKERJAAN PERSIAPAN
1.Pembersihan Lokasi Luas 1 = 13 x 12.8 173.5 m2
= 166,4
Luas total=173,55
2. Pemasangan Bouwplank
Bouwplank = 29 titik 29 m1
Luas total=6,2409
= 13,9+13+12,8+13,05
52.75
II PEKERJAAN TANAH.
Volume =0,15x1x62
= 9.3 m3
Volume = 0.875x62 =
54.25
IV PEKERJAAN BETON Panjang sloof = 62 m 2,325 m3
1. Pekerjaan Beton sloof Penampang = 0.15x0.25
Volume = 0.15x0.25x62
= 2.325 m3
Luas=0.40x62=24.8m2
Luas = 0.40x62=24.8m2
Volume = 0.15x0.20x62
= 1.86 m3
Luas = 0.40x62=24.8 m2
12. Pekerjaan Bongkar Bekesting 24.8 m2
Panjang bersih =
= 16-0,82 =15.18 m
Luas = 15.18x1.25 =
= 18.975 m2
Luas = 59.88x0.55=
= 32.934 m2
Dikurangi :
1.Tasram = 51.909 m2
2. Pintu/jendela :
a. Pintu Jendela 1
Jumlah = 1 buah.
Luas = 2.06x2-(0.46x1.08)
= 4.12 - 0.4968
= 3.6232 m2
b. Pintu 1
Jumlah = 4 buah.
Luas = 4x2.06x0.92 =
= 7.5808 m
c. Pintu 2
Jumlah = 3 buah.
Luas =
=3x2.06x0.82 =
= 5.0676 m2
d. Jendela 1
Jumlah = 4 buah.
Luas = 4x1.1x1.54 =
= 6.776 m2
e. Jendela 2
Jumlah = 2 buah.
Luas = 2x1.1x0.60 =
= 1.32 m2
e. Bouwvenlick
Jumlah = 3 buah.
Luas = 0.50x0.8 =
= 0.4 m2
Luas bersih =
= 202.6375 - 76.2766 =
= 126.3609 m2
Panjang 2 sisi =
= 8.12 x 2
= 16.24 m1
Panjang 2 sisi =
= 23,84 x 2
= 47.68 m1
Volume = 10.4x0.0072
= 0,07488 m3
V0lume = 20.16x0.0072
= 0,145152 m3
V0lume = 14.82x0.0072
= 0,106704 m3
Jumlah kosen = 4 buah
Penampang = 0.06x0.12
Panjang kayu kosen =
(1.54x2)+(1.1x3)x4 =
= 25.52 m
V0lume =25.52x0.0072
= 0,183744 m3
Volume =6.8x0.0072
= 0,04896 m3
Volume = 7.8x0.0072
= 0,05616 m3
Volume seluruh =
0,07488+0,145152+0,106704+
0,183744+0,04896+0,05616
= 0,6156 m3
Jumlah = 8 bh
Luas = 0.7x1x8
= 5.6 m2
Jumlah = 2 bh
Luas = 0.5x1x2
= 1 m2
Jumlah = 3 bh
Luas = 0.7x0.4x3
= 0.84 m2
Jumlah seluruh =
1.5+5.6+1+0.84
= 8.94 m2
4. Pekerjaan kuda-kuda
Jumlah kuda-kuda =2 bh 0.398784 m3
Penampang = 0.08x0.12
= 0.0096 m2
Panjang 1 buah =
6.45+4.72+4.72+1.39+1.39+2.1
= 20.77 m
Volume 1 bh =
= 20.77x0.0096
= 0.199392 m3
Volume 2 buah =
= 0.199392x2 =
= 0.398784 m3
5. Pekerjaan Gording
Jumlah = 4 batang 0.805632 m3
Panjang = 20.98 m
Penampang = 0.08x0.12
= 0.0096 m2
Volume = 4x20.98x0.0096
= 0.805632 m3
6. Pekerjaan Plapon
Luas plapon dalam = 74.475 m2
= (5.5x6)+(4.7x3.5)+(6.5x3.85)
= 74,475 m2
7. Pekerjaan Lisplang
Panjang listplank = 50.3 m1
= (12.15x2)+12.35+11.5+1.5+0.65
= 50,3 m1
8. Pekerjaan Papan reuter
Panjjang papan reuter = 46.76 m1
(5.48x4)+(3.96x4)+4.12+4.88
= 46.76
(3.88x7.75)+((4.88+12.63)
x3.87)+(1/2x5.6x2.8)+(7.35
x3.05)-(1/2x5.6x2.8)
120.2512
7. Pekerjaan Kaca
Jumlah daun jend = 2 bh 5.2872 m2
Ukuran kaca = 0.17x0.33
= 0.0561 m2
Setiap daun = 8 buah
Luas = 2x0.0561x8
= 0.8976 m2
X PEKERJAAN SANITAIR
1. Pekerjaan Bak Mandi
Jumlah = 3 buah. 3
Volume = 0.30 m3
2. Pekerjaan Klosed Jongkok
Jumlah = 3 buah. 3 buah
3. Pekerjaan Bak Dapur
Jumlah = 1 buah. 1 buah
4. Pekerjaan Wastapel
Jumlah = 1 buah. 1 buah
5. Pekerjaan Bak Kontrol
Jumlah = 2 buah. 2 buah
6. Pekerjaan Septiktank
Jumlah = 2 buah. 2 buah
7. Pekerjaan Peresapan
Jumlah = 3 buah. 3 buah
8. Pekerjaan Piap Air Bersih 1/2 "
Panjang=datar+vertikal 19 m1
Panjang datar =
=0.3+4+1.55+0.3
= 6.15 m1
Panjang vertikal =
= 4.3+5.5+0.3+2.15
= 12.25 m1
Jumlah = 6.15+12.25
= 18.4 m1
= 19 m2
9. Pekerjaan Pipa Air Kotor 4 "
Panjang =7.62+8.41+1.5 24 m1
2.55+1.57
= 21.65 m1
= 24 m1
5.86
0.3809
6.2409
2.25
52.75
51.7 107.198
61.14
112.84
26.7995
250 150
200 200
250 150
200 200
900 700
1000
1020
1000
150
235
350
200 2.76
3955 2.46
2
3955 7.22
385
350
550
370
5610
150
150
5910
150
200
250
200
6710
400
400 200
125 150
125 300
200 400
150 300
225 300
425 300
370 300
350 250 NV
250 300
200 400
200 300
150 300
235 300
350 4500
200
385
370
350
550
250
225
150
6235
51.909
3.6232
7.5808
5.0676
6.776
1.32
76.2766
2.06
2
1.6
2
0.46
8.12
16.24
47.68
34.56
42.24
13.6
15.6
169.92
10.4
20.16
14.82
25.52
6.8
0.92 7.8
4.12 85.5
5.04
3.08
3.3
6.38
1.2
2.2
3.4
1.6
1
2.6
0.07488
0.145152
0.106704
0.183744
0.04896
0.05616
0.6156
1.5
5.6
1
0.84
8.94
33
16.45
25.025
74.475
24.3
12.35
11.5
1.5
0.65
50.3
21.92
15.84
4.12
4.88
46.76
9
7.5
20
12.7
42.1
91.3
30.07
67.7637
7.84
22.4175
128.0912
7.84
33
16.45
25.025
3.75
78.225
5
3
4.6
2.46
7.06
1.5
5.6
1
0.84
8.94
0.8976
3.4112
0.5248
0.4536
5.2872
HARGA SATUAN UPAH
TAHUN 2017
PEKERJAAN PERSIAPAN
PEKERJAAN PONDASI
PEKERJAAN DINDING
1.00 m2 Memasang dinding bata merah , campuran spesi 1 PC : 2 PP
70.0000 bh Bata merah @ Rp. 750.00 52,500.00
18.9500 kg Portland Cement (PC) Gresik @ Rp. 780.00 14,781.00
0.0380 m3 Pasir Pasang @ Rp. 267,900.00 10,180.20
0.3000 oh Pekerja @ Rp. 56,200.00 16,860.00
0.1000 oh Tukang batu @ Rp. 65,000.00 6,500.00
0.0100 oh Kepala tukang batu @ Rp. 70,000.00 700.00
0.0150 oh Mandor Batu @ Rp. 72,500.00 1,087.50
JUMLAH ( BELUM PPN ) 25,147.50 77,461.20
JASA 10 %
JUMLAH
DIBULATKAN
PEKERJAAN BETON
1.00 m3 Membuat beton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66
326.0000 kg Portland Cement (PC) Gresik @ Rp. 780.00 254,280.00
0.5429 m3 Pasir pasang @ Rp. 267,900.00 145,442.91
0.7622 m3 Agregat kasar/ Krikil @ Rp. 134,000.00 102,134.80
215.0000 Ltr Air @ Rp. 600.00 129,000.00
1.6500 oh Pekerja Batu @ Rp. 56,200.00 92,730.00
0.2750 oh Tukang batu @ Rp. 65,000.00 17,875.00
0.0280 oh Kepala tukang batu @ Rp. 70,000.00 1,960.00
0.0830 oh Mandor Batu @ Rp. 72,500.00 6,017.50
JUMLAH ( BELUM PPN ) 118,582.50 630,857.71
JASA 10 %
JUMLAH
DIBULATKAN
PEKERJAAN PLESTERAN
1.00 m2 Memasang plesteran 1 PC : 2 PP, tebal 15 mm
10.2240 kg Portland Cement (PC) Gresik @ Rp. 780.00 7,974.72
0.0200 m3 Pasir Pasang @ Rp. 267,900.00 5,358.00
0.3000 oh Pekerja Batu @ Rp. 56,200.00 16,860.00
0.1500 oh Tukang batu @ Rp. 65,000.00 9,750.00
0.0150 oh Kepala tukang batu @ Rp. 70,000.00 1,050.00
0.0150 oh Mandor Batu @ Rp. 72,500.00 1,087.50
JUMLAH ( BELUM TERMASUK PPN ) 28,747.50 13,332.72
JASA 10 %
JUMLAH
DIBULATKAN
1.00 m2 Pasang conblock tipe segi-empat, uni, segi-enam abu-abu 8 cm, K-400
1.0000 m2 Konblok @ Rp. 58,000.00 58,000.00
0.0500 m3 Pasir urug @ Rp. 267,900.00 13,395.00
0.5000 oh Pekerja Batu @ Rp. 56,200.00 28,100.00
0.2500 oh Tukang batu @ Rp. 65,000.00 16,250.00
0.0250 oh Kepala tukang batu @ Rp. 70,000.00 1,750.00
0.0250 oh Mandor Batu @ Rp. 72,500.00 1,812.50
JUMLAH ( BELUM PPN ) 47,912.50 71,395.00
JASA 10 %
JUMLAH
DIBULATKAN
1.00 m3 Membuat dan memasang kusen pintu dan kusen jendela, kayu kamper
1.2000 m3 Kayu kruing balok @ Rp. 6,250,000.00 7,500,000.00
1.2500 kg Paku reng 55 x 3,1 mm @ Rp. 18,000.00 22,500.00
1.0000 kg Lem kayu (putih) Fox @ Rp. 25,000.00 25,000.00
6.0000 oh Pekerja Kayu @ Rp. 56,200.00 337,200.00
18.0000 oh Tukang kayu @ Rp. 67,500.00 1,215,000.00
1.8000 oh Kepala tukang kayu @ Rp. 70,000.00 126,000.00
0.3000 oh Mandor Kayu @ Rp. 72,500.00 21,750.00
JUMLAH ( BELUM PPN ) 1,699,950.00 7,547,500.00
JASA 10 %
JUMLAH
DIBULATKAN
1.00 m2 Membuat dan memasang pintu dan jendela kaca, kayu kamper
0.0240 m3 Kayu kruing papan @ Rp. 7,750,000.00 186,000.00
0.3000 kg Lem kayu (putih) Fox @ Rp. 25,000.00 7,500.00
0.8000 oh Pekerja Kayu @ Rp. 56,200.00 44,960.00
2.4000 oh Tukang kayu @ Rp. 67,500.00 162,000.00
0.2400 oh Kepala tukang kayu @ Rp. 70,000.00 16,800.00
0.0400 oh Mandor Kayu @ Rp. 72,500.00 2,900.00
JUMLAH ( BELUM PPN ) 226,660.00 193,500.00
JASA 10 %
JUMLAH
DIBULATKAN
1.00 m2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu kamper memakai plepet
0.0120 m3 Kayu kruing balok @ Rp. 6,250,000.00 75,000.0000
0.0600 kg Paku usuk 80 x 3,8 mm @ Rp. 18,000.00 1,080.0000
1.1000 lbr Asbes plat ( 100 x 100 x 0,3 ) @ Rp. 18,000.00 19,800.0000
2.6000 m1 Kayu plepet eternit 1/5 cm @ Rp. 2,000.00 5,200.0000
0.0100 kg Paku eternit 20 x 1,5 mm @ Rp. 18,000.00 180.0000
0.0100 kg Paku plepet 40 x 2,1 mm @ Rp. 14,000.00 140.0000
0.1800 oh Pekerja Kayu @ Rp. 56,200.00 10,116.0000
0.3200 oh Tukang kayu @ Rp. 67,500.00 21,600.0000
0.0320 oh Kepala tukang kayu @ Rp. 70,000.00 2,240.0000
0.0090 oh Mandor Kayu @ Rp. 72,500.00 652.5000
JUMLAH ( BELUM PPN ) 34,608.50 101,400.00
JASA 10 %
JUMLAH
DIBULATKAN
1.00 m2 Pengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 3 Lapis Cat Penutup
0.2000 kg Cat meni kayu, besi dan genteng @ Rp. 16,300.00 3,260.00
0.1500 kg Plamur kayu Jago @ Rp. 27,000.00 4,050.00
0.1700 kg Cat dasar meni kayu Jago @ Rp. 18,500.00 3,145.00
0.3500 kg Cat kayu se kualitas Emco biasa @ Rp. 65,000.00 22,750.00
0.0700 oh Pekerja Cat @ Rp. 56,200.00 3,934.00
0.1050 oh Tukang Cat @ Rp. 65,000.00 6,825.00
0.0040 oh Kepala tukang cat @ Rp. 70,000.00 280.00
0.0025 oh Mandor Cat @ Rp. 72,500.00 181.25
JUMLAH ( BELUM TERMASUK PPN ) 11,220.25 33,205.00
JASA 10 %
JUMLAH
DIBULATKAN
1.00 bh Memasang Bak Kontrol pasangan Batu Bata ukuran (45 x 45 )cm, t = 50 cm
150.0000 bh Batu bata @ Rp. 750.00 112,500.00
77.0000 kg Portland Cement (PC) Gresik @ Rp. 780.00 60,060.00
0.1300 m3 Pasir pasang @ Rp. 267,900.00 34,827.00
0.0200 m3 Agregat kasar/ Krikil @ Rp. 134,000.00 2,680.00
2.6000 kg Besi beton polos @ Rp. 12,000.00 31,200.00
0.0900 m3 Pasir beton @ Rp. 267,900.00 24,111.00
1.4200 oh Pekerja Batu @ Rp. 56,200.00 79,804.00
0.4730 oh Tukang batu @ Rp. -
0.0470 oh Kepala tukang batu @ Rp. -
0.0710 oh Mandor Batu @ Rp. -
JUMLAH ( BELUM TERMASUK PPN ) 79,804.00 265,378.00
JASA 10 %
JUMLAH
DIBULATKAN
9,245.00
924.50
10,169.50
88,070.00
8,807.00
96,877.00
1,731,970.00
173,197.00
1,905,167.00
603,105.50
60,310.55
663,416.05
110,575.00
11,057.50
121,632.50
121,450.00
12,145.00
133,595.00
12,167.90
1,216.79
13,384.69
32,624.20
3,262.42
35,886.62
95,585.00
9,558.50
105,143.50
339,065.00
33,906.50
372,971.50
42,312.50
4,231.25
46,543.75
441,179.40
44,117.94
485,297.34
221,916.30
22,191.63
244,107.93
102,608.70
10,260.87
112,869.57
97,264.20
9,726.42
106,990.62
94,552.50
9,455.25
104,007.75
749,440.21
74,944.02
824,384.23
137,514.00
13,751.40
151,265.40
15,126.54
304,165.00
30,416.50
334,581.50
224,800.00
22,480.00
247,280.00
42,080.22
4,208.02
46,288.24
39,425.28
3,942.53
43,367.81
9,404.20
940.42
10,344.62
21,700.00
2,170.00
23,870.00
158,333.00
15,833.30
174,166.30
158,095.00
15,809.50
173,904.50
54,954.78
5,495.48
60,450.26
60,450.26
337,579.00
33,757.90
371,336.90
371,336.90
119,307.50
11,930.75
131,238.25
9,247,450.00
924,745.00
10,172,195.00
605,825.00
60,582.50
666,407.50
420,160.00
42,016.00
462,176.00
8,300,400.00
830,040.00
9,130,440.00
7,805,480.00
780,548.00
8,586,028.00
60,432.50
6,043.25
66,475.75
77,932.50
7,793.25
85,725.75
38,995.10
3,899.51
42,894.61
136,008.50
13,600.85
149,609.35
12,667.50
1,266.75
13,934.25
69,165.00
6,916.50
76,081.50
72,990.80
7,299.08
80,289.88
44,425.25
4,442.53
48,867.78
41,841.25
4,184.13
46,025.38
44,711.25
4,471.13
49,182.38
423,159.00
42,315.90
465,474.90
397,359.00
39,735.90
437,094.90
345,182.00
34,518.20
379,700.20
28,173.70
2,817.37
30,991.07
370,126.95
37,012.70
407,139.65
883,394.75
88,339.48
971,734.23
25,205.75
2,520.58
27,726.33
68,124.50
6,812.45
74,936.95
20,800,920.00
2,080,092.00
22,881,012.00
120,374.50
12,037.45
132,411.95
159,562.25
15,956.23
175,518.48
47,072.38
4,707.24
51,779.61
33,048.25
3,304.83
36,353.08
29,672.38
2,967.24
32,639.61
78,622.38
7,862.24
86,484.61
22,072.38
2,207.24
24,279.61
27,072.38
2,707.24
29,779.61
RENCANA ANGGARAN BIAYA TIAP PEKERJAAN
I PEKERJAAN PERSIAPAN
1 173.5 m2 Pembersihan Lokasi @ Rp. 10,169.50 @ Rp. 1,764,408.25
2 29 m1 Pemasangan Bouwplank @ Rp. 138,921.75 @ Rp. 4,028,730.75
3 0 m2 Pembuatan Jalan Sementara @ Rp. 96,877.00 @ Rp. -
4 10.5 m2 Pembuatan Kantor Direksi dan Gudang @ Rp. 1,905,167.00 @ Rp. 20,004,253.50
5 62 m1 Pembuatan Pagar Sementara @ Rp. 663,416.05 @ Rp. 41,131,795.10
JUMLAH @ Rp. 66,929,187.60
DIBLATKAN @ Rp.
II PEKERJAAN TANAH.
1 58.9 m2 Galian Tanah @ Rp. 121,632.50 @ Rp. 7,164,154.25
2 15.5 m1 Urugan Tanah Kembali @ Rp. 13,384.69 @ Rp. 207,462.70
3 22.34 m2 Urugan Tanah Bawah Lantai @ Rp. 105,143.50 @ Rp. 2,348,905.79
4 11.17 m3 Pekerjaan Urug Pasir Bawah lantai @ Rp. 372,971.50 @ Rp. 4,166,091.66
JUMLAH @ Rp. 13,886,614.39
DIBLATKAN @ Rp.
IV PEKERJAAN BETON
1 0 m3 Pekerjaan Beton sloof @ Rp. 824,384.23 @ Rp. -
2 25.575 kg Pekerjaan Pembesian @ Rp. 15,126.54 @ Rp. 386,861.26
3 24.8 m2 Pekerjaan Pasang Bekesting @ Rp. 334,581.50 @ Rp. 8,297,621.20
4 24.8 m2 Pekerjaan Bongkar Bekesting @ Rp. 247,280.00 @ Rp. 6,132,544.00
5 2.8125 m3 Pekerjaan Beton Kolom @ Rp. 824,384.23 @ Rp. 2,318,580.65
6 30.9375 kg Pekerjaan Pembesian @ Rp. 15,126.54 @ Rp. 467,977.33
7 24.8 m2 Pekerjaan Pasang Bekesting @ Rp. 334,581.50 @ Rp. 8,297,621.20
8 24.8 m2 Pekerjaan Bongkar Bekesting @ Rp. 247,280.00 @ Rp. 6,132,544.00
9 1.86 m3 Pekerjaan Beton Ring @ Rp. 824,384.23 @ Rp. 1,533,354.67
10 20.46 kg Pekerjaan Pembesian @ Rp. 15,126.54 @ Rp. 309,489.01
11 24.8 m2 Pekerjaan Pasang Bekesting @ Rp. 334,581.50 @ Rp. 8,297,621.20
12 24.8 m2 Pekerjaan Bongkar Bekesting @ Rp. 247,280.00 @ Rp. 6,132,544.00
JUMLAH @ Rp. 48,306,758.52
DIBLATKAN @ Rp.
X PEKERJAAN SANITAIR
1 3 bh Pekerjaan Bak Mandi @ Rp. 379,700.20 @ Rp. 1,139,100.60
2 3 bh Pekerjaan Klosed Jongkok @ Rp. 465,474.90 @ Rp. 1,396,424.70
3 1 bh Pekerjaan Bak Dapur @ Rp. 971,734.23 @ Rp. 971,734.23
4 1 bh Pekerjaan Wastapel @ Rp. 437,094.90 @ Rp. 437,094.90
5 2 bh Pekerjaan Bak Kontrol @ Rp. 379,700.20 @ Rp. 759,400.40
6 2 bh Pekerjaan Septiktank @ Rp. @ Rp. -
7 3 bh Pekerjaan Peresapan @ Rp. @ Rp. -
8 19 m1 Pekerjaan Piap Air Bersih 1/2 " @ Rp. 30,991.07 @ Rp. 588,830.33
9 24 m1 Pekerjaan Pipa Air Kotor 4 " @ Rp. 407,139.65 @ Rp. 9,771,351.48
10 3 bh Pekerjaan Kran @ Rp. 27,726.33 @ Rp. 83,178.98
11 1 bh Pekerjaan Flour Drain @ Rp. 74,936.95 @ Rp. 74,936.95
JUMLAH @ Rp. 15,222,052.56
DIBLATKAN @ Rp.
REKAPILTULASI BIAYA
I PEKERJAAN PERSIAPAN
1. Membersihkan Lapangan
KWANTITAS KEBUTUHAN
NO TENAGA/BAHAN INDEK SATUAN JUMLAH SATUAN DURASI 2D
TENAGA DAN BAHAN
1 Mandor batu 0.0500 oh 173.5 m2 8.68 6
2 Pekerja batu 0.1000 oh 201.5 m2 20.15 11
2. Pemasangan Bouwplank
KWANTITAS KEBUTUHAN
NO TENAGA/BAHAN INDEK SATUAN JUMLAH SATUAN DURASI 1D
TENAGA DAN BAHAN
1 Kayu Meranti Balok 0.0120 m3 0 m1 -
2 Kayu Meranti Papan 0.0070 m3 20 m1 0.14
3 Paku Biasa 2" - 5" 0.0200 kg 20 m1 0.40
4 Pekerja Batu 0.1000 oh 20 m1 2.00
5 Tukang batu 0.1000 oh 20 m1 2.00 2
6 Kepala tukang batu 0.0100 oh 20 m1 0.20 1
7 Mandor Batu 0.0050 oh 20 m1 0.10 1
II PEKERJAAN TANAH. `
1. Galian Tanah
KWANTITAS KEBUTUHAN
NO TENAGA/BAHAN INDEK SATUAN JUMLAH SATUAN DURASI 3D
TENAGA DAN BAHAN
Pekerja Batu 0.7500 oh 58.9 m3 44.18 8
Mandor Batu 0.0250 oh 28.86 m3 0.72 1
IV PEKERJAAN BETON
1. Pekerjaan Beton sloof
KWANTITAS KEBUTUHAN
NO TENAGA/BAHAN INDEK SATUAN JUMLAH SATUAN DURASI 1D
TENAGA DAN BAHAN
Portland Cement (PC) Gresik 326.0000 kg 0 m3 -
Pasir pasang 0.5429 m3 1.67 m3 0.91
Agregat kasar/ Krikil 0.7622 m3 1.67 m3 1.27
Air 215.0000 Liter 1.67 m3 359.05
Pekerja Batu 1.6500 oh 1.67 m3 2.76 3
Tukang batu 0.2750 oh 1.67 m3 0.46 1
Kepala tukang batu 0.0280 oh 1.67 m3 0.05 1
Mandor Batu 0.0830 oh 1.67 m3 0.14 1
2. Pekerjaan Pembesian
KWANTITAS KEBUTUHAN
NO TENAGA/BAHAN INDEK SATUAN JUMLAH SATUAN DURASI 1D
TENAGA DAN BAHAN
Besi beton polos 10.5000 kg 25.575 kg 268.54
Kawat beton / bindrat 0.1500 kg 18.37 kg 2.76
Pekerja Besi 0.0700 oh 18.37 kg 1.29 2
Tukang besi 0.0700 oh 18.37 kg 1.29 2
Kepala tukang besi 0.0070 oh 18.37 kg 0.13 1
Mandor Besi 0.0040 oh 18.37 kg 0.07 1
6. Pekerjaan Pembesian
KWANTITAS KEBUTUHAN
NO TENAGA/BAHAN INDEK SATUAN JUMLAH SATUAN DURASI 1D
TENAGA DAN BAHAN
Besi beton polos 10.5000 kg 30.9375 kg 324.84
Kawat beton / bindrat 0.1500 kg 15.84 kg 2.38
Pekerja Besi 0.0700 oh 15.84 kg 1.11 2
Tukang besi 0.0700 oh 15.84 kg 1.11 2
Kepala tukang besi 0.0070 oh 15.84 kg 0.11 1
Mandor Besi 0.0040 oh 15.84 kg 0.06 1
7. Pekerjaan Pasang Bekesting
KWANTITAS KEBUTUHAN
NO TENAGA/BAHAN INDEK SATUAN JUMLAH SATUAN DURASI 2D
TENAGA DAN BAHAN
Kayu Meranti Balok 0.0170 m3 24.8 m2 0.42
Kayu Meranti Papan 0.0240 m3 19.2 m2 0.46
Paku usuk 80 x 3,8 mm 0.4000 kg 19.2 m2 7.68
Pekerja Kayu 0.2000 oh 19.2 m2 3.84 2
Tukang kayu 0.5000 oh 19.2 m2 9.60 5
Kepala tukang kayu 0.0500 oh 19.2 m2 0.96 1
Mandor Kayu 0.0100 oh 19.2 m2 0.19 1
6. Pekerjaan Acian
KWANTITAS KEBUTUHAN
NO TENAGA/BAHAN INDEK SATUAN JUMLAH SATUAN DURASI 6D
TENAGA DAN BAHAN
Portland Cement (PC) Gresik 3.2500 kg 37.95 m2 123.34
Pekerja Batu 0.2000 oh 297.48 m2 59.50 10
Tukang batu 0.1000 oh 297.48 m2 29.75 5
Kepala tukang batu 0.0100 oh 297.48 m2 2.97 1
Mandor Batu 0.0100 oh 297.48 m2 2.97 1
4. Pekerjaan kuda-kuda
KWANTITAS KEBUTUHAN
NO TENAGA/BAHAN INDEK SATUAN JUMLAH SATUAN DURASI 1D
TENAGA DAN BAHAN
Kayu kruing balok 1.1000 m3 0.398784 m3 0.44
Besi strip 15.0000 kg 0.38 m3 5.70
Paku gording 100 x 4,2 mm 5.6000 kg 0.38 m3 2.13
Pekerja Kayu 4.0000 oh 0.38 m3 1.52 2
Tukang kayu 12.0000 oh 0.38 m3 4.56 5
Kepala tukang kayu 1.2000 oh 0.38 m3 0.46 1
Mandor Kayu 0.2000 oh 0.38 m3 0.08 1
5. Pekerjaan Gording
KWANTITAS KEBUTUHAN
NO TENAGA/BAHAN INDEK SATUAN JUMLAH SATUAN DURASI 1D
TENAGA DAN BAHAN
Kayu kruing balok 1.1000 m3 0.805632 m3 0.89
Besi strip 15.0000 kg 0.51 m3 7.65
Paku gording 100 x 4,2 mm 3.0000 kg 0.51 m3 1.53
Pekerja Kayu 2.4000 oh 0.51 m3 1.22 2
Tukang kayu 7.2000 oh 0.51 m3 3.67 4
Kepala tukang kayu 0.7200 oh 0.51 m3 0.37 1
Mandor Kayu 0.1200 oh 0.51 m3 0.06 1
6. Pekerjaan Plapon
KWANTITAS KEBUTUHAN
NO TENAGA/BAHAN INDEK SATUAN JUMLAH SATUAN DURASI 6D
TENAGA DAN BAHAN
Kayu kruing balok 0.0120 m3 74.475 m2 0.89
Paku usuk 80 x 3,8 mm 0.0600 kg 92 m2 5.52
Asbes plat ( 100 x 100 x 0,3 ) 1.1000 lbr 92 m2 101.20
Kayu plepet eternit 1/5 cm 2.6000 m1 92 m2 239.20
Paku eternit 20 x 1,5 mm 0.0100 kg 92 m2 0.92
Paku plepet 40 x 2,1 mm 0.0100 kg 92 m2 0.92
Pekerja Kayu 0.1800 oh 92 m2 16.56 3
Tukang kayu 0.3200 oh 92 m2 29.44 5
Kepala tukang kayu 0.0320 oh 92 m2 2.94 1
Mandor Kayu 0.0090 oh 92 m2 0.83 1
7. Pekerjaan Lisplang
KWANTITAS KEBUTUHAN
NO TENAGA/BAHAN INDEK SATUAN JUMLAH SATUAN DURASI 3D
TENAGA DAN BAHAN
Papan kayu kamper 0.0072 m3 0 m2 -
Paku reng 55 x 3,1 mm 0.0500 kg 41 m2 2.05
Pekerja Kayu 0.1000 oh 41 m2 4.10 2
Tukang kayu 0.2000 oh 41 m2 8.20 3
Kepala tukang kayu 0.0250 oh 41 m2 1.03 1
Mandor Kayu 0.0050 oh 41 m2 0.21 1
5. Pekerjaan Grendel
KWANTITAS KEBUTUHAN
NO TENAGA/BAHAN INDEK SATUAN JUMLAH SATUAN DURASI 1D
TENAGA DAN BAHAN
Grendel 1.0000 bh 14 bh 14.00
Pekerja Kayu 0.0150 oh 36 bh 0.54 1
Tukang kayu 0.1500 oh 36 bh 5.40 6
Kepala tukang kayu 0.0150 oh 36 bh 0.54 1
Mandor Kayu 0.0008 oh 36 bh 0.03 1
7. Pekerjaan Kaca
KWANTITAS KEBUTUHAN
NO TENAGA/BAHAN INDEK SATUAN JUMLAH SATUAN DURASI 1D
TENAGA DAN BAHAN
Kaca bening 3 mm 1.1000 m2 5.2872 bh 5.82
Pekerja Kayu 0.0150 oh 12.82 bh 0.19 1
Tukang kayu 0.1500 oh 12.82 bh 1.92 2
Kepala tukang kayu 0.0150 oh 12.82 bh 0.19 1
Mandor Kayu 0.0008 oh 12.82 bh 0.01 1
X PEKERJAAN SANITAIR
1. Pekerjaan Bak Mandi
KWANTITAS KEBUTUHAN
NO TENAGA/BAHAN INDEK SATUAN JUMLAH SATUAN DURASI 1D
TENAGA DAN BAHAN
Batu bata 240.0000 bh 3 bh 720.00
Portland Cement (PC) Gresik 120.0000 Kg 1 bh 120.00
Pasir pasang 0.3000 m3 1 bh 0.30
Porselen (11 x 11) cm 360.0000 bh 1 bh 360.00
Semen warna 6.0000 Kg 1 bh 6.00
Pekerja Batu 6.0000 oh 1 bh 6.00 6
Tukang batu 3.0000 oh 1 bh 3.00 3
Kepala tukang batu 0.3000 oh 1 bh 0.30 1
Mandor Batu 0.3000 oh 1 bh 0.30 1
4. Pekerjaan Wastapel
KWANTITAS KEBUTUHAN
NO TENAGA/BAHAN INDEK SATUAN JUMLAH SATUAN DURASI 1D
TENAGA DAN BAHAN
Wastafel 1.0000 bh 1 bh 1.00
Harga wastafel (Perlengkapan) 0.1200 x 1 bh 0.12
Portland Cement (PC) Gresik 6.0000 kg 1 bh 6.00
Pasir pasang 0.0100 m3 1 bh 0.01
Pekerja Batu 1.2000 oh 1 bh 1.20 2
Tukang batu 1.4500 oh 1 bh 1.45 2
Kepala tukang batu 0.1500 oh 1 bh 0.15 1
Mandor Batu 0.1000 oh 1 bh 0.10 1
6. Pekerjaan Septiktank
KWANTITAS KEBUTUHAN
NO TENAGA/BAHAN INDEK SATUAN JUMLAH SATUAN DURASI 1D
TENAGA DAN BAHAN
2 bh -
1 bh -
1 bh -
1 bh -
1 bh -
1 bh -
1 bh -
1 bh -
1 bh -
7. Pekerjaan Peresapan
KWANTITAS KEBUTUHAN
NO TENAGA/BAHAN INDEK SATUAN JUMLAH SATUAN DURASI 1D
TENAGA DAN BAHAN
3 bh -
1 bh -
1 bh -
1 bh -
1 bh -
1 bh -
1 bh -
1 bh -