REKAPITULASI

ENGINEER'S ESTIMATE
Satuan Kerja : DINAS PERINDUSTRIAN DAN PERDAGANGAN
Pekerjaan : REVITALISASI KIOS PASAR BINAYA MASOHI
Lokasi : MASOHI - KAB. MALUKU TENGAH
Tahun Anggaran : 2016

No. URAIAN PEKERJAAN BIAYA (Rp)

I PEKERJAAN STRUKTUR #N/A


II PEKERJAAN ARSITEKTUR Err:509
III PEKERJAAN ELEKTRIKAL #N/A
IV PEKERJAAN MEKANIKAL #N/A

BIAYA PEKERJAAN FISIK #N/A


PPN 10 % #N/A
JUMLAH TOTAL BIAYA FISIK #N/A
PEMBULATAN #N/A

Terbilang : #N/A

Masohi, April 2016


KONSULTAN PERENCANA,
CV. KINAMI

Ir. IMAM MUSHOLIKHIN


Direktur
ENGINEER'S ESTIMATE
(EE)
Satuan Kerja : DINAS PERINDUSTRIAN DAN PERDAGANGAN
Pekerjaan : REVITALISASI KIOS PASAR BINAYA MASOHI
Lokasi : MASOHI - KAB. MALUKU TENGAH
TA : 2016

HARGA
JUMLAH
NO URAIAN PEKERJAAN SAT. VOLUME
(Rp.)
(Rp.)

IV PEKERJAAN ELEKTRIKAL
A PEKERJAAN INSTALASI LISTRIK
1 Penyambungan Daya 900 Watt bh 4.00 #N/A #N/A
2 Pasang Lampu SL 14 Watt + Veeting bh - #N/A #N/A
3 Pasang Stop Kontak bh 2.00 72,248.75 144,497.50
4 Pasang Saklar Tunggal bh Err:509 78,803.75 Err:509
5 Pasang Saklar Ganda bh 2.00 91,913.75 183,827.50
6 Instalasi Lampu Penerangan ttk 4.00 375,532.50 1,502,130.00
7 Instalasi Stop Kontak ttk 2.00 375,532.50 751,065.00
sub total #N/A
A PEKERJAAN CCTV
1 Penyambungan Daya 900 Watt bh - #N/A #N/A
2 Pasang Lampu SL 14 Watt + Veeting bh 2.00 #N/A #N/A
3 Pasang Stop Kontak bh Err:509 72,248.75 Err:509
4 Pasang Saklar Tunggal bh - 78,803.75 -
5 Pasang Saklar Ganda bh 4.00 91,913.75 367,655.00
6 Instalasi Lampu Penerangan ttk Err:509 375,532.50 Err:509
7 Instalasi Stop Kontak ttk Err:509 375,532.50 Err:509
sub total #N/A
B PEKERJAAN PENANGKAL PETIR
1 Instalasi Penangkal Petir Unit - 5,000,000.00 -
sub total -

JUMLAH #N/A
REKAPITULASI
ENGINEER'S ESTIMATE
Satuan Kerja : DINAS PERINDUSTRIAN DAN PERDAGANGAN
Pekerjaan : PEMBANGUNAN FASUM KIOS PASAR BINAYA MASOHI
Lokasi : MASOHI - KAB. MALUKU TENGAH
Tahun Anggaran : 2016

No. URAIAN PEKERJAAN BIAYA (Rp)

I PEKERJAAN STRUKTUR #N/A


II PEKERJAAN ARSITEKTUR Err:509
III PEKERJAAN ELEKTRIKAL #N/A
IV PEKERJAAN MEKANIKAL #N/A

BIAYA PEKERJAAN FISIK #N/A


PPN 10 % #N/A
JUMLAH TOTAL BIAYA FISIK #N/A
PEMBULATAN #N/A

Terbilang : Enam Ratus Dua Puluh Satu Juta Sembilan Ratus Sembilan Puluh Satu Ribu Rupiah

Masohi, April 2016


KONSULTAN PERENCANA,
CV. KINAMI

Ir. IMAM MUSHOLIKHIN


Direktur
ENGINEER'S ESTIMATE
(EE)
Satuan Kerja : DINAS PERINDUSTRIAN DAN PERDAGANGAN
Pekerjaan : PEMBANGUNAN FASUM KIOS PASAR BINAYA MASOHI
Lokasi : MASOHI - KAB. MALUKU TENGAH
TA : 2016

HARGA
JUMLAH
NO URAIAN PEKERJAAN SAT. VOLUME
(Rp.)
(Rp.)

I PEKERJAAN STRUKTUR
A PEKERJAAN TANAH
1 Galian Tanah Pondasi Batu Kali M³ 12.18 92,000.00 1,120,744.00
2 Urug Kembali Tanah Galian M³ 4.06 69,000.00 280,186.00
3 Urug Pasir Bawah Pondasi M³ 3.17 #N/A #N/A
sub total #N/A
B PEKERJAAN PASANGAN
1 Pondasi Batu Kosong (Aanstamping) M³ 4.75 682,345.83 3,240,460.35
2 Pondasi Batu Kali 1 PC : 5 Psr M³ 16.32 1,160,754.11 18,940,605.19
sub total 22,181,065.54
C PEKERJAAN BETON
1 Rabat Beton Mutu f'c =7,4 Mpa (K-100) M³ 2.68 #N/A #N/A
2 Sloof S1 15 x 20 cm
Beton mutu f'c = 19,3 Mpa (K-225) M³ 1.42 1,500,320.48 2,128,954.77
Pembesian dengan Besi Polos atau Ulir Kg 213.98 28,944.93 6,193,528.92
Bekisting Sloof M² 18.92 224,547.28 4,248,434.44
3 Kolom K1 20 x 20 cm
Beton mutu f'c = 19,3 Mpa (K-225) M³ 1.20 1,500,320.48 1,800,384.58
Pembesian dengan Besi Polos atau Ulir Kg 205.67 28,944.93 5,953,006.24
Bekisting Kolom M² 24.00 417,238.40 10,013,721.60
4 Balok B1 15 x 20 cm
Beton mutu f'c = 19,3 Mpa (K-225) M³ 1.09 1,500,320.48 1,638,349.97
Pembesian dengan Besi Polos atau Ulir Kg 243.85 28,944.93 7,058,252.12
Bekisting Balok M² 14.56 426,669.32 6,212,305.30
5 Balok Konsol B2 15 x 20 cm
Beton mutu f'c = 19,3 Mpa (K-225) M³ 0.28 1,500,320.48 419,039.51
Pembesian dengan Besi Polos atau Ulir Kg 63.53 28,944.93 1,838,835.71
Bekisting Balok M² 5.12 426,669.32 2,184,760.25
6 Balok Lisplank B3 8 x 35 cm
Beton mutu f'c = 19,3 Mpa (K-225) M³ 1.70 1,500,320.48 2,554,145.59
Pembesian dengan Besi Polos atau Ulir Kg 202.46 28,944.93 5,860,305.30
Bekisting Balok M² 47.42 426,669.32 20,234,365.83
7 Balok Latai Beton Bertulang (10 x 15) cm M¹ 25.20 176,625.40 4,450,959.95
8 Kolom Praktis Beton Bertulang (11 x 11) cm M¹ 33.00 139,974.32 4,619,152.56
9 Ring Balok Beton Bertulang (10 x 15) cm M¹ 12.40 185,901.30 2,305,176.06
sub total #N/A
D PEKERJAAN ATAP
1 Rangka Atap Baja Ringan (Galvalum) M² 73.22 #N/A #N/A
sub total #N/A
Jumlah Pekerjaan Struktur #N/A

II PEKERJAAN ARSITEKTUR
A PEKERJAAN PASANGAN DAN PLESTERAN
1 Dinding Batako 1 PC : 5 Psr M² Err:509 162,006.02 Err:509
2 Plesteran 1 PC : 5 Psr, tebal 15 mm M² Err:509 84,214.79 Err:509
3 Acian M² Err:509 #N/A Err:509
HARGA
JUMLAH
NO URAIAN PEKERJAAN SAT. VOLUME
(Rp.)
(Rp.)

sub total Err:509


HARGA
JUMLAH
NO URAIAN PEKERJAAN SAT. VOLUME
(Rp.)
(Rp.)

B PEKERJAAN KERAMIK LANTAI


1 Lantai Keramik ukuran 40 x 40 cm M² 16.25 #N/A #N/A
2 Lantai Selasar Keramik ukuran 40 x 40 cm Anti Selip M² 24.92 #N/A #N/A
3 Lantai Keramik KM/WC ukuran 40 x 40 cm, Anti Selip M² 16.25 #N/A #N/A
4 Keramik Dinding ukuran 20 x 40 cm M² 37.20 #N/A #N/A
5 Plint Keramik ukuran 10 x 40 cm M¹ 21.00 #N/A #N/A
sub total #N/A
C PEKERJAAN PINTU DAN JENDELA
1 Pintu P-1 Unit 4.00 #N/A #N/A
2 Pintu PVC P-2 Unit 6.00 #N/A #N/A
3 Jendela J-1 Unit 2.00 #N/A #N/A
4 Jendela BV-1 Unit 6.00 #N/A #N/A
5 Jendela BV-2 Unit 3.00 #N/A #N/A
6 Jendela BV-3 Unit 2.00 #N/A #N/A
sub total #N/A
D PEKERJAAN PLAFOND
1 Rangka Plafond Besi Hollow, Modul 60 x 120 cm M² 32.49 #N/A #N/A
2 Plafond Gypsum Board 9 mm M² 32.49 #N/A #N/A
3 List Profil Gypsum M¹ 69.50 #N/A #N/A
sub total #N/A
E PEKERJAAN ATAP
1 Atap Zincalume 0,35 mm M² 73.22 145,668.20 10,666,189.77
2 Nok Zincalume 0,35 mm M¹ 18.70 104,024.40 1,945,256.28
3 Talang Zincalume 0,35 mm M¹ 17.80 #N/A #N/A
4 Lisplank GRC 2 x 20 cm M¹ 37.20 71,863.50 2,673,322.20
5 Manumata Polycarbonat 5 mm Rangka Hollow Galvanis Unit 2.00 #N/A #N/A
6 Atap Polycarbonat t = 5 mm Rangka Hollow Galvanis M² 22.95 #N/A #N/A
sub total #N/A
F PEKERJAAN PENGECATAN
1 Cat Tembok M² Err:509 38,470.38 Err:509
2 Cat Plafond M² 32.49 39,735.38 1,291,002.33
3 Cat Lisplank dengan Roof Paint M² 7.44 32,784.78 243,918.73
sub total Err:509
Jumlah Pekerjaan Arsitektur Err:509

III PEKERJAAN ELEKTRIKAL


A PEKERJAAN INSTALASI PENERANGAN, STOP KONTAK
1 Pasang Lampu SL 18 Watt + Veeting bh 2.00 115,373.75 230,747.50
2 Pasang Lampu SL 14 Watt + Veeting bh 4.00 #N/A #N/A
3 Pasang Lampu SL 5 Watt + Veeting bh 6.00 #N/A #N/A
4 Pasang Stop Kontak bh 3.00 72,248.75 216,746.25
5 Pasang Saklar Tunggal bh 6.00 78,803.75 472,822.50
6 Pasang Saklar Ganda bh 3.00 91,913.75 275,741.25
7 Instalasi Lampu Penerangan ttk 12.00 375,532.50 4,506,390.00
8 Instalasi Stop Kontak ttk 3.00 375,532.50 1,126,597.50
Jumlah Pekerjaan Elektrikal #N/A

IV PEKERJAAN MEKANIKAL
A PEKERJAAN INSTALASI AIR HUJAN
1 Pasang Roof Drain Bh 3.00 #N/A #N/A
2 Pasang Pipa Air Hujan Pipa PVC AW 3" M¹ 12.00 #N/A #N/A
3 Pasang Pipa Induk Air Hujan Pipa PVC AW 5" M¹ 18.00 #N/A #N/A
Jumlah Pekerjaan Mekanikal #N/A

JUMLAH #N/A
PEMERINTAH KAB. MALUKU TENGAH
DINAS PERIKANAN
Jl. Buru Telp. / Fax. (0914) 21247 - Masohi 97511

ENGINEER'S ESTIMATE
(EE)

PEKERJAAN :
PEMBANGUNAN BENGKEL NELAYAN
DAN GALANGAN KAPAL

LOKASI :
WAITOMU, DESA HILA -
KABUPATEN MALUKU TENGAH

NILAI :
Rp. 200,000,000.00

SUMBER DANA :
APBD

TAHUN ANGGARAN 2019


REKAPITULASI
ENGINEER'S ESTIMATE

Satuan Kerja : Dinas Perdagangan dan Perindustrian Kab. Maluku Tengah


Pekerjaan : Pembangunan Rumah Produksi Pandai Besi
Lokasi : Kabupaten Maluku Tengah
Tahun Anggaran : 2020

No. URAIAN PEKERJAAN

I. DAFTAR MATA PEMBAYARAN UMUM


A. Mata Pembayaran Lumpsum 51,100,000.00

II. DAFTAR MATA PEMBAYARAN UTAMA


A. Mata Pembayaran Harga Satuan 704,581,376.31

BIAYA PEKERJAAN FISIK 755,681,376.31


PPN 10% 75,568,137.63
JUMLAH TOTAL 831,249,513.94
PEMBULATAN 831,250,000.00

Terbilang : Enam Ratus Dua Puluh Satu Juta Sembilan Ratus Sembilan Puluh Satu Ribu Rupiah

KEPALA DINAS
PERDAGANGAN DAN PERINDUSTRIAN
KAB. MALUKU TENGAH

NIP. …………………………………….
DAFTAR MATA PEMBAYARAN UMUM & UTAMA

I. DAFTAR MATA PEMBAYARAN UMUM


A. Mata Pembayaran Lumpsum

HARGA
JUMLAH
NO URAIAN PEKERJAAN SAT. VOLUME
(Rp.)
(Rp.)

I SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI


1 Penyiapan RKK :
Pembuatan dokumen Rencana Keselamatan Konstruksi Set 1.00 200,000.00 200,000.00
Pembuatan Prosedur dan instruksi Kerja
Penyiapan Formulir
sub total 200,000.00
2 Sosialisasi, Promosi dan Pelatihan :
Induksi K3 (Safety Induction) Org 10.00 15,000.00 150,000.00
Pelatihan K3 Org 10.00 15,000.00 150,000.00
Simulasi K3 Org 10.00 15,000.00 150,000.00
Spanduk (Banner) Org 10.00 15,000.00 150,000.00
Poster Org 10.00 15,000.00 150,000.00
Papan Informasi K3 Org 10.00 15,000.00 150,000.00
sub total 900,000.00
3 Alat Pelindung Kerja dan Alat Pelindung Diri
APK antara lain :
Pembatas Area Ls 1.00 500,000.00 500,000.00
APD antara lain :
Topi Pelindung (Safety Helmet) Bh 10.00 60,000.00 600,000.00
Pelindung Mata (Googles, Spectacles) Psg 10.00 35,000.00 350,000.00
Pelindung pernafasan dan Mulut (Masker) Bh 10.00 15,000.00 150,000.00
Sarung Tangan (Safety Gloves) Psg 10.00 20,000.00 200,000.00
Penunjang Seluruh Tubuh (Full Body Herness) Bh 10.00 75,000.00 750,000.00
Rompi Keselamatan (Safety Vest) Bh 10.00 68,000.00 680,000.00
Sepatu Keselamatan (Safety Shoes) Psg 10.00 110,000.00 1,100,000.00
sub total 4,330,000.00
4 Asuransi dan Perizinan :
BPJS Ketenegakerjaan & Kesehatan Kerja Ls 1.00 4,000,000.00 4,000,000.00
sub total 4,000,000.00
5 Personel K3 Konstruksi :
Ahli K3 Konstruksi OB 1.00 2,915,000.00 2,915,000.00
sub total 2,915,000.00
6 Fasilitas, Sarana dan prasarana Kesehatan
Peralatan P3K(Kotak P3K, Tandu, Obat Luka,Perban, dll) Ls 1.00 2,500,000.00 2,500,000.00
sub total 2,500,000.00
7 Rambu - Rambu Yang Di Perlukan
Rambu Petunjuk Bh 4.00 45,000.00 180,000.00
Rambu Larangan Bh 4.00 45,000.00 180,000.00
Rambu Peringatan Bh 4.00 45,000.00 180,000.00
Rambu Kewajiban Bh 4.00 45,000.00 180,000.00
Rambu Informasi Bh 4.00 45,000.00 180,000.00
sub total 900,000.00
8 Konsultasi dengan ahli terkait keselamatan konstruksi
Ahli K3 Konstruksi OB 1.00 3,000,000.00 3,000,000.00
sub total 3,000,000.00
9 Lain - lain Terkait Pengendalian Resiko Keselamatan Konstruksi
Alat Pemadam Api Ringan (APAR) Bh 2.00 650,000.00 1,300,000.00
Program Inspeksi & Audit Internal Ls 1.00 500,000.00 500,000.00
Pelaporan dan penyelidikan Insiden Ls 1.00 750,000.00 750,000.00
sub total 2,550,000.00
JUMLAH PEKERJAAN SMKK 21,295,000.00
HARGA
JUMLAH
NO URAIAN PEKERJAAN SAT. VOLUME
(Rp.)
(Rp.)

II PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan dan Perataan Ls 1.00 10,000,000.00 10,000,000.00
2 Pengukuran dan Pemasangan Bouwplank Ls 1.00 9,300,000.00 9,300,000.00
3 Pembuatan Papan Nama Proyek Ls 1.00 505,000.00 505,000.00
4 Dokumentasi & Pelaporan Ls 1.00 5,000,000.00 5,000,000.00
5 Pembersihan Akhir Ls 1.00 5,000,000.00 5,000,000.00
JUMLAH PEKERJAAN PERSIAPAN 29,805,000.00
JUMLAH TOTAL PEKERJAAN LUMPSUM 51,100,000.00

II. DAFTAR MATA PEMBAYARAN UTAMA


A. Mata Pembayaran Harga Satuan

HARGA
JUMLAH
NO URAIAN PEKERJAAN SAT. VOLUME
(Rp.)
(Rp.)

I PEKERJAAN STRUKTUR (11 UNIT)


A PEKERJAAN TANAH
1 Galian Tanah Pondasi Batu Kali M³ 9.60 92,000.00 883,200.00
2 Urug Kembali Tanah Galian M³ 3.20 69,000.00 220,800.00
3 Urug Pasir Bawah Pondasi Batu Kali M³ 0.60 310,178.00 186,106.80
4 Urug Pasir Bawah Rabat Beton Keliling M³ 0.39 310,178.00 119,418.53
5 Urug Tanah Peninggian Lantai M³ 4.80 241,730.00 1,160,304.00
sub total 2,569,829.33
B PEKERJAAN PASANGAN
1 Pondasi Batu Kali 1 PC : 5 Psr M³ 4.00 1,160,754.11 4,643,016.44
2 Pondasi Batu Kosong (Aanstamping) M³ 1.80 682,345.83 1,228,222.49
sub total 5,871,238.93
C PEKERJAAN BETON
1 Rabat Beton Lantai mutu f'c =7,4 Mpa (K-100) M³ 0.50 1,177,207.92 583,942.22
2 Tempat Bakar Besi & Tempat Arang
Beton mutu f'c = 16,9 Mpa (K-200) M³ 0.19 1,500,320.48 281,310.09
Pembesian dengan Besi Polos atau Ulir Kg 28.02 28,944.93 810,970.13
Bekisting untuk dinding M² 3.00 465,141.65 1,395,424.95
3 Tempat duduk beton
Beton mutu f'c = 16,9 Mpa (K-200) M³ 0.31 1,500,320.48 462,158.72
Pembesian dengan Besi Polos atau Ulir Kg 25.31 28,944.93 732,489.15
Bekisting untuk plat lantai M² 3.56 526,718.40 1,872,483.91
4 Kolom K1 15 x 15 cm
Beton mutu f'c = 16,9 Mpa (K-200) M³ 0.27 1,500,320.48 406,683.07
Pembesian dengan Besi Polos atau Ulir Kg 46.62 28,944.93 1,349,302.09
Bekisting Kolom M² 7.20 417,238.40 3,004,116.48
5 Ring Balok RB1 15 x 20 cm
Beton mutu f'c = 16,9 Mpa (K-200) M³ 0.60 1,500,320.48 900,192.29
Pembesian dengan Besi Polos atau Ulir Kg 77.69 28,944.93 2,248,836.81
Bekisting Balok M² 11.00 426,669.32 4,693,362.52
6 Kolom Praktis Beton Bertulang (11 x 11) cm M¹ 6.00 139,974.32 839,845.92
sub total 19,581,118.35
D PEKERJAAN ATAP
1 Atap Zincalume 0,35 mm M² 32.20 145,668.20 4,690,516.04
2 Nok Zincalume 0,35 mm M¹ 31.68 104,024.40 3,295,492.99
3 Lisplank GRC 2 x 20 cm M¹ 26.40 71,863.50 1,897,196.40
4 Kuda-Kuda Kayu Kelas I M³ 0.30 12,922,009.50 3,903,894.13
5 Gording Kayu Kelas II M³ 0.35 8,506,791.50 2,994,390.61
sub total 16,781,490.17
JUMLAH PEKERJAAN STRUKTUR (11 UNIT) 492,840,444.64
HARGA
JUMLAH
NO URAIAN PEKERJAAN SAT. VOLUME
(Rp.)
(Rp.)

II PEKERJAAN ARSITEKTUR (11 UNIT)


A PEKERJAAN PASANGAN DAN PLESTERAN
1 Dinding Batako 1 PC : 5 Psr M² 16.20 162,006.02 2,624,497.52
2 Dinding Bata Merah 1 PC : 5 Psr M² 8.55 233,538.50 1,995,586.52
3 Plesteran 1 PC : 5 Psr, tebal 15 mm M² 59.15 84,214.79 4,980,883.47
4 Acian Dinding M² 59.15 50,811.60 3,005,252.08
sub total 12,606,219.59
B PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu & Jendela, Kayu Kelas II M³ 0.04 8,489,024.00 347,167.13
2 Daun Pintu Panel, Kayu Kelas II M² 0.70 874,920.00 615,768.70
3 Pasang Kunci Tanam 2 Slaag Bh 2.00 354,947.50 709,895.00
4 Pasang Engsel Pintu Bh 4.00 70,696.25 282,785.00
sub total 1,955,615.82
C PEKERJAAN PENGECATAN
1 Cat Tembok M² 59.15 38,470.38 2,275,330.33
2 Cat Lisplank dengan Roof Paint M² 5.28 32,784.78 173,103.61
sub total 2,448,433.94
JUMLAH PEKERJAAN ARSITEKTUR (11 UNIT) 187,112,962.92

III PEKERJAAN ELEKTRIKAL (11 UNIT)


A PEKERJAAN INSTALASI PENERANGAN, STOP KONTAK
1 Pasang Stop Kontak bh 5.00 72,248.75 361,243.75
2 Instalasi Stop Kontak ttk 5.00 375,532.50 1,877,662.50
JUMLAH PEKERJAAN ELEKTRIKAL (11 UNIT) 24,627,968.75
JUMLAH TOTAL PEKERJAAN HARGA SATUAN 704,581,376.31
REKAPITULASI
ENGINEER'S ESTIMATE

Satuan Kerja : Dinas Perdagangan dan Perindustrian Kab. Maluku Tengah


Pekerjaan : Pembangunan Rumah Produksi Pandai Besi
Lokasi : Kabupaten Maluku Tengah
Tahun Anggaran : 2020

No. URAIAN PEKERJAAN

I PEKERJAAN PERSIAPAN 32,785,500.00


II SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI 25,906,100.00
III PEKERJAAN STRUKTUR (11 UNIT) 542,124,489.10
IV PEKERJAAN ARSITEKTUR (11 UNIT) 18,711,296.29
V PEKERJAAN ELEKTRIKAL (11 UNIT) 2,462,796.88

BIAYA PEKERJAAN FISIK 621,990,182.27


PEMBULATAN 621,991,000.00

Terbilang : Enam Ratus Dua Puluh Satu Juta Sembilan Ratus Sembilan Puluh Satu Ribu Rupiah

KEPALA DINAS
PERDAGANGAN DAN PERINDUSTRIAN
KAB. MALUKU TENGAH

NIP. …………………………………….
REKAPITULASI
ENGINEER'S ESTIMATE
Satuan Kerja :
Pekerjaan :
Lokasi :
Tahun Anggaran :

No. URAIAN PEKERJAAN BIAYA (Rp)

I PEKERJAAN PERSIAPAN #REF!


III PEKERJAAN STRUKTUR (11 UNIT) #REF!
IV PEKERJAAN ARSITEKTUR (11 UNIT) #REF!
V PEKERJAAN ELEKTRIKAL (11 UNIT) #REF!

BIAYA PEKERJAAN FISIK #REF!


PPN 10 % #REF!
JUMLAH TOTAL BIAYA FISIK #REF!
BIAYA PERENCANAAN #REF!
BIAYA PENGAWASAN #REF!
TPP #REF!
JUMLAH TOTAL KESELURUHAN #REF!
PEMBULATAN #REF!

Terbilang : Enam Ratus Dua Puluh Satu Juta Sembilan Ratus Sembilan Puluh Satu Ribu Rupiah

Konsultan Perencana,
CV. BERDIKARI CONSULTANT

ROYKE JANEIRO, ST.


Direktur
ENGINEER'S ESTIMATE
(EE)
Satuan Kerja : Dinas Perdagangan dan Perindustrian Kab. Maluku Tengah
Pekerjaan : Pembangunan Rumah Produksi Pandai Besi
Lokasi : Kabupaten Maluku Tengah
TA : 2020

HARGA
JUMLAH
NO URAIAN PEKERJAAN SAT. VOLUME PPN 10%
(Rp.)
(Rp.)

I PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan dan Perataan Ls 1.00 10,000,000.00 1,000,000.00 11,000,000.00
2 Pengukuran dan Pemasangan Bouwplank Ls 1.00 9,300,000.00 930,000.00 10,230,000.00
3 Pembuatan Papan Nama Proyek Ls 1.00 505,000.00 50,500.00 555,500.00
4 Dokumentasi & Pelaporan Ls 1.00 5,000,000.00 500,000.00 5,500,000.00
5 Pembersihan Akhir Ls 1.00 5,000,000.00 500,000.00 5,500,000.00
JUMLAH 32,785,500.00
ENGINEER'S ESTIMATE
(EE)
Satuan Kerja : Dinas Perdagangan dan Perindustrian Kab. Maluku Tengah
Pekerjaan : Pembangunan Rumah Produksi Pandai Besi
Lokasi : Kabupaten Maluku Tengah
TA : 2020

HARGA
JUMLAH
NO URAIAN PEKERJAAN SAT. VOLUME PPN 10%
(Rp.)
(Rp.)

II SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI


1 Penyiapan RKK :
Pembuatan dokumen Rencana Keselamatan Konstruksi Set 1.00 2,456,000.00 245,600.00 2,701,600.00
Pembuatan Prosedur dan instruksi Kerja
Penyiapan Formulir
sub total 2,701,600.00
2 Sosialisasi, Promosi dan Pelatihan :
Induksi K3 (Safety Induction) Org 10.00 15,000.00 15,000.00 165,000.00
Pelatihan K3 Org 10.00 15,000.00 15,000.00 165,000.00
Simulasi K3 Org 10.00 15,000.00 15,000.00 165,000.00
Spanduk (Banner) Org 10.00 15,000.00 15,000.00 165,000.00
Poster Org 10.00 15,000.00 15,000.00 165,000.00
Papan Informasi K3 Org 10.00 15,000.00 15,000.00 165,000.00
sub total 990,000.00
3 Alat Pelindung Kerja dan Alat Pelindung Diri
APK antara lain :
Pembatas Area Ls 1.00 500,000.00 50,000.00 550,000.00
APD antara lain :
Topi Pelindung (Safety Helmet) Bh 10.00 60,000.00 60,000.00 660,000.00
Pelindung Mata (Googles, Spectacles) Psg 10.00 35,000.00 35,000.00 385,000.00
Pelindung pernafasan dan Mulut (Masker) Bh 10.00 15,000.00 15,000.00 165,000.00
Sarung Tangan (Safety Gloves) Psg 10.00 20,000.00 20,000.00 220,000.00
Penunjang Seluruh Tubuh (Full Body Herness) Bh 10.00 75,000.00 75,000.00 825,000.00
Rompi Keselamatan (Safety Vest) Bh 10.00 68,000.00 68,000.00 748,000.00
Sepatu Keselamatan (Safety Shoes) Psg 10.00 110,000.00 110,000.00 1,210,000.00
sub total 4,763,000.00
4 Asuransi dan Perizinan :
BPJS Ketenegakerjaan & Kesehatan Kerja Ls 1.00 4,000,000.00 400,000.00 4,400,000.00
sub total 4,400,000.00
5 Personel K3 Konstruksi :
Ahli K3 Konstruksi OB 1.00 2,915,000.00 291,500.00 3,206,500.00
sub total 3,206,500.00
6 Fasilitas, Sarana dan prasarana Kesehatan
Peralatan P3K(Kotak P3K, Tandu, Obat Luka,Perban, dll) Ls 1.00 2,500,000.00 250,000.00 2,750,000.00
sub total 2,750,000.00
7 Rambu - Rambu Yang Di Perlukan
Rambu Petunjuk Bh 4.00 45,000.00 18,000.00 198,000.00
Rambu Larangan Bh 4.00 45,000.00 18,000.00 198,000.00
Rambu Peringatan Bh 4.00 45,000.00 18,000.00 198,000.00
Rambu Kewajiban Bh 4.00 45,000.00 18,000.00 198,000.00
Rambu Informasi Bh 4.00 45,000.00 18,000.00 198,000.00
sub total 990,000.00
8 Konsultasi dengan ahli terkait keselamatan konstruksi
Ahli K3 Konstruksi OB 1.00 3,000,000.00 300,000.00 3,300,000.00
sub total 3,300,000.00
HARGA
JUMLAH
NO URAIAN PEKERJAAN SAT. VOLUME PPN 10%
(Rp.)
(Rp.)

9 Lain - lain Terkait Pengendalian Resiko Keselamatan Konstruksi


Alat Pemadam Api Ringan (APAR) Bh 2.00 650,000.00 130,000.00 1,430,000.00
Program Inspeksi & Audit Internal Ls 1.00 500,000.00 50,000.00 550,000.00
Pelaporan dan penyelidikan Insiden Ls 1.00 750,000.00 75,000.00 825,000.00
sub total 2,805,000.00
JUMLAH 25,906,100.00
ENGINEER'S ESTIMATE
(EE)
Satuan Kerja : Dinas Perdagangan dan Perindustrian Kab. Maluku Tengah
Pekerjaan : Pembangunan Rumah Produksi Pandai Besi
Lokasi : Kabupaten Maluku Tengah
TA : 2020

HARGA
JUMLAH
NO URAIAN PEKERJAAN SAT. VOLUME PPN 10%
(Rp.)
(Rp.)

III PEKERJAAN STRUKTUR (11 UNIT)


A PEKERJAAN TANAH
1 Galian Tanah Pondasi Batu Kali M³ 9.60 92,000.00 88,320.00 971,520.00
2 Urug Kembali Tanah Galian M³ 3.20 69,000.00 22,080.00 242,880.00
3 Urug Pasir Bawah Pondasi Batu Kali M³ 0.60 310,178.00 18,610.68 204,717.48
4 Urug Pasir Bawah Rabat Beton Keliling M³ 0.39 310,178.00 11,941.85 131,360.38
5 Urug Tanah Peninggian Lantai M³ 4.80 241,730.00 116,030.40 1,276,334.40
sub total 2,826,812.26
B PEKERJAAN PASANGAN
1 Pondasi Batu Kali 1 PC : 5 Psr M³ 4.00 1,160,754.11 464,301.64 5,107,318.08
2 Pondasi Batu Kosong (Aanstamping) M³ 1.80 682,345.83 122,822.25 1,351,044.74
sub total 6,458,362.83
C PEKERJAAN BETON
1 Rabat Beton Lantai mutu f'c =7,4 Mpa (K-100) M³ 0.50 1,177,207.92 58,394.22 642,336.44
2 Tempat Bakar Besi & Tempat Arang
Beton mutu f'c = 16,9 Mpa (K-200) M³ 0.19 1,500,320.48 28,131.01 309,441.10
Pembesian dengan Besi Polos atau Ulir Kg 28.02 28,944.93 81,097.01 892,067.14
Bekisting untuk dinding M² 3.00 465,141.65 139,542.50 1,534,967.45
3 Tempat duduk beton
Beton mutu f'c = 16,9 Mpa (K-200) M³ 0.31 1,500,320.48 46,215.87 508,374.59
Pembesian dengan Besi Polos atau Ulir Kg 25.31 28,944.93 73,248.91 805,738.06
Bekisting untuk plat lantai M² 3.56 526,718.40 187,248.39 2,059,732.30
4 Kolom K1 15 x 15 cm
Beton mutu f'c = 16,9 Mpa (K-200) M³ 0.27 1,500,320.48 40,668.31 447,351.37
Pembesian dengan Besi Polos atau Ulir Kg 46.62 28,944.93 134,930.21 1,484,232.30
Bekisting Kolom M² 7.20 417,238.40 300,411.65 3,304,528.13
5 Ring Balok RB1 15 x 20 cm
Beton mutu f'c = 16,9 Mpa (K-200) M³ 0.60 1,500,320.48 90,019.23 990,211.52
Pembesian dengan Besi Polos atau Ulir Kg 77.69 28,944.93 224,883.68 2,473,720.50
Bekisting Balok M² 11.00 426,669.32 469,336.25 5,162,698.77
6 Kolom Praktis Beton Bertulang (11 x 11) cm M¹ 6.00 139,974.32 83,984.59 923,830.51
sub total 21,539,230.18
D PEKERJAAN ATAP
1 Atap Zincalume 0,35 mm M² 32.20 145,668.20 469,051.60 5,159,567.64
2 Nok Zincalume 0,35 mm M¹ 31.68 104,024.40 329,549.30 3,625,042.29
3 Lisplank GRC 2 x 20 cm M¹ 26.40 71,863.50 189,719.64 2,086,916.04
4 Kuda-Kuda Kayu Kelas I M³ 0.30 12,922,009.50 390,389.41 4,294,283.55
5 Gording Kayu Kelas II M³ 0.35 8,506,791.50 299,439.06 3,293,829.67
sub total 18,459,639.19
JUMLAH 49,284,044.46
11 UNIT 542,124,489.10
PERHITUNGAN VOLUME

Kegiatan #REF!
Pekerjaan #REF!
Lokasi #REF!
Thn. Anggaran #REF!

No. URAIAN PEKERJAAN VOLUME

III PEKERJAAN STRUKTUR (11 UNIT)


A PEKERJAAN TANAH
1 Galian Tanah Pondasi Batu Kali 9.60

2 Urug Kembali Tanah Galian 3.20

3 Urug Pasir Bawah Pondasi Batu Kali 0.60

4 Urug Pasir Bawah Rabat Beton Keliling 0.39


Bawah Rabat Kios

timbunan 4.80

B PEKERJAAN PASANGAN
1 Batu Kosong 1.80

1 Pondasi Batu Kali 1 PC : 5 Psr 4.00


Pondasi Keliling

C PEKERJAAN BETON

PONDASI TELAPAK
BETON 0.61
PEMBESIAN 51.11

BEKISTING 12.60

LANTAI KERJA BAWAH PONDASI 0.13

PASIR URUG BAWAH PONDASI 0.13

1 Rabat Beton Keliling 0.39


kiri kanan

1 Sloof Beton
beton k-100 0.60

Pembesian 77.69

Bekisting 11.00

4 Kolom K1 15 x 15 cm
Beton mutu f'c = 16,9 Mpa (K-200) 0.27
Kolom As - A

Pembesian dengan Besi Polos atau Ulir 46.62


As - A

Bekisting Kolom 7.20


As - A

1 Tempat duduk beton


Beton mutu f'c = 16,9 Mpa (K-200) 0.31
Pembesian dengan Besi Polos atau Ulir 25.31

Bekisting untuk plat lantai 3.56

Dinding Bata 0.05

Rabat beton Lantai 0.31

TEMPAT BAKAR

Pelat beton 0.19

Rabat Beton 0.14

pembesian 28.02

Bekisting 3.00

TEMPAT ARANG

Rabat Beton 0.05

5 Ring Balok RB1 15 x 20 cm


Beton mutu f'c = 16,9 Mpa (K-200) 0.60

Pembesian 77.69

Bekisting 11.00
6 Kolom Praktis Beton Bertulang (11 x 11) cm 6.00
Kolom Praktis

D PEKERJAAN ATAP
1 Atap Zincalume 0,35 mm 32.20
segitiga
trapesium

2 Nok Zincalume 0,35 mm 31.68


Nok

3 Lisplank GRC 2 x 20 cm 26.40


Memanjang

4 Kuda-Kuda Kayu Kelas I 0.30

5 Gording Kayu Kelas II 0.35

6 Tiang Kayu
0.36

7 Balok Kayu 0.20


NGAN VOLUME

DIMENSI
JUMLAH
SAT. pjg lbr tg VOLUME
jmlh VOLUME
(m) (m) (m)

M³ 9.60
20.00 0.60 0.80 9.60

M³ 3.20
3.20

M³ 20.00 0.60 0.05 0.60 0.60

M³ 0.39
14.00 0.55 0.05 0.39

M³ 4.00 6.00 0.20 4.80 4.80

M3 20.00 0.60 0.15 1.80 1.80

M³ 20.00 0.20 0.60 0.5 4.00 4.00

M3 0.80 0.80 0.20 4 0.51 0.61


0.15 0.20 0.80 4 0.10

12 5.33 2.10 0.89 4 39.75 51.11


12 4.00 0.80 0.89 4 11.36

0.80 4 3.20 12.60


2.35 4 9.40

0.80 0.80 0.05 4 0.13 0.13

0.80 0.80 0.05 4 0.13 0.13

M3 0.39
14.00 0.55 0.05 0.39

M3 0.60
20.00 0.15 0.20 0.60

10 4.00 20.00 0.62 49.30 77.69


8 0.54 133.333 0.39 28.40

0.55 20.000 11.00 11.00

M³ 0.27
0.15 0.15 3.00 4 0.27

Kg 46.62
10 4.00 3.00 0.62 4 29.58
8 0.54 20.000 0.39 4 17.04

M2 0.60 3.00 4 7.20 7.20

M3 3.85 0.80 0.10 0.31 0.31


Kg 25.31
10 25.67 0.800 0.62 12.65
10 3.85 5.33 0.62 12.65

M2 0.90 3.950 3.56 3.56

M2 0.80 0.680 0.1 1 0.05 0.05

M3 3.85 0.80 0.10 0.31 0.31

M3 1.50 1.25 0.10 0.19 0.19

M3 1.20 0.95 0.10 0.11 0.14


0.50 0.50 0.10 0.03

10 10.00 1.10 0.62 2 13.56 28.02


10 7.33 1.60 0.62 2 14.46

M2 1.50 1.00 2 3.00 3.00

M3 0.70 0.70 0.10 0.05 0.05

M³ 0.60
20.00 0.15 0.20 0.60

10 4.00 20.00 0.62 49.30 77.69


8 0.54 133.333 0.39 28.40

0.55 20.000 11.00 11.00


M' 6.00
3.00 2 6.00

M² 32.20
5.32 5.32
26.88 26.88

M¹ 31.68
15.84 2 31.68

M¹ 26.40
26.40 1 26.40

M³ 0.30
20.98 0.12 0.06 2 0.30

M³ 0.35
70.40 0.05 0.10 0.35

M³ 0.10 0.10 4.00 9 0.36 0.36

M³ 0.10 0.10 20.00 0.20 0.20


L. Atas L. Bawah Tinggi pondasi tinggi galian
0.2 0.6 0.6 0.8

#REF! #REF!

#REF!
7.6

tul utama 10
tul sengk. 8

#REF! #REF!
ENGINEER'S ESTIMATE
(EE)
Satuan Kerja : Dinas Perdagangan dan Perindustrian Kab. Maluku Tengah
Pekerjaan : Pembangunan Rumah Produksi Pandai Besi
Lokasi : Kabupaten Maluku Tengah
TA : 2020

HARGA
JUMLAH
NO URAIAN PEKERJAAN SAT. VOLUME PPN 10%
(Rp.)
(Rp.)

IV PEKERJAAN ARSITEKTUR (11 UNIT)


A PEKERJAAN PASANGAN DAN PLESTERAN
1 Dinding Batako 1 PC : 5 Psr M² 16.20 162,006.02 262,449.75 2,886,947.28
2 Dinding Bata Merah 1 PC : 5 Psr M² 8.55 233,538.50 199,558.65 2,195,145.17
3 Plesteran 1 PC : 5 Psr, tebal 15 mm M² 59.15 84,214.79 498,088.35 5,478,971.82
4 Acian Dinding M² 59.15 50,811.60 300,525.21 3,305,777.29
sub total 13,866,841.55
B PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu & Jendela, Kayu Kelas II M³ 0.04 8,489,024.00 34,716.71 381,883.84
2 Daun Pintu Panel, Kayu Kelas II M² 0.70 874,920.00 61,576.87 677,345.57
3 Pasang Kunci Tanam 2 Slaag Bh 2.00 354,947.50 70,989.50 780,884.50
4 Pasang Engsel Pintu Bh 4.00 70,696.25 28,278.50 311,063.50
sub total 2,151,177.40
C PEKERJAAN PENGECATAN
1 Cat Tembok M² 59.15 38,470.38 227,533.03 2,502,863.36
2 Cat Lisplank dengan Roof Paint M² 5.28 32,784.78 17,310.36 190,413.97
sub total 2,693,277.34
JUMLAH 18,711,296.29
11 UNIT 205,824,259.21
ENGINEER'S ESTIMATE
(EE)
Satuan Kerja : Dinas Perdagangan dan Perindustrian Kab. Maluku Tengah
Pekerjaan : Pembangunan Rumah Produksi Pandai Besi
Lokasi : Kabupaten Maluku Tengah
TA : 2020

HARGA
JUMLAH
NO URAIAN PEKERJAAN SAT. VOLUME PPN 10%
(Rp.)
(Rp.)

V PEKERJAAN ELEKTRIKAL (11 UNIT)


A PEKERJAAN INSTALASI PENERANGAN, STOP KONTAK
1 Pasang Stop Kontak bh 5.00 72,248.75 36,124.38 397,368.13
2 Instalasi Stop Kontak ttk 5.00 375,532.50 187,766.25 2,065,428.75
JUMLAH 2,462,796.88
11 UNIT 54,181,531.25
ENGINEER'S ESTIMATE
(EE)
Satuan Kerja #REF!
Pekerjaan #REF!
Lokasi #REF!
TA #REF!

HARGA
JUMLAH
NO URAIAN PEKERJAAN SAT. VOLUME
(Rp.)
(Rp.)

V PEKERJAAN MEKANIKAL
A PEKERJAAN INSTALASI AIR HUJAN
1 Pasang Roof Drain Bh 50.00 #N/A -
2 Pasang Pipa Air Hujan Pipa PVC AW 3" M¹ 225.00 #N/A -
3 Pasang Pipa Induk Air Hujan Pipa PVC AW 5" M¹ 595.00 #N/A -
sub total -
D SALURAN KELILING
1 Galian Tanah Saluran Air M³ 77.96 #N/A -
2 Urug Kembali Tanah Galian M³ 11.14 69,000.00 -
3 Urug Pasir Bawah Saluran M³ 14.85 #N/A -
4 Rabat Beton Bawah Saluran, t = 8 cm Mutu f'c =7,4 Mpa (K-100) M³ 7.43 #N/A -
5 Dinding Batako 1 PC : 5 Psr M² 178.00 162,006.02 -
6 Plesteran 1 PC : 5 Psr, tebal 15 mm M² 148.50 84,214.79 -
7 Plat Penutup Saluran
Beton mutu f'c = 19,3 Mpa (K-225) M³ 1.66 1,500,320.48 -
Pembesian dengan Besi Polos atau Ulir Kg 152.63 28,944.93 -
Bekisting Plat Penutup M² 7.34 #N/A -
sub total -

JUMLAH -
ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN TANAH

1 1 m3 Galian Tanah Pondasi Batu Kali AHSP CK A.2.3.1.1 92,000.00


0.7500 OH Pekerja 100,000.00 75,000.00
TENAGA
0.0250 OH Mandor 200,000.00 5,000.00
JUMLAH HARGA 80,000.00
OVERHEAD & PROFIT 15 % 12,000.00
HARGA SATUAN PEKERJAAN 92,000.00

2 1 m3 Galian Tanah Pondasi Telapak AHSP CK A.2.3.1.1 92,000.00


0.7500 OH Pekerja 100,000.00 75,000.00
TENAGA
0.0250 OH Mandor 200,000.00 5,000.00
JUMLAH HARGA 80,000.00
OVERHEAD & PROFIT 15 % 12,000.00
HARGA SATUAN PEKERJAAN 92,000.00

3 1 m3 Urug Kembali Tanah Galian AHSP CK A.2.3.1.9 69,000.00


0.5000 OH Pekerja 100,000.00 50,000.00
TENAGA
0.0500 OH Mandor 200,000.00 10,000.00
JUMLAH HARGA 60,000.00
OVERHEAD & PROFIT 15 % 9,000.00
HARGA SATUAN PEKERJAAN 69,000.00

4 1 m3 Urug Pasir Bawah Pondasi Batu Kali AHSP CK A.2.3.1.11 310,178.00


0.3000 OH Pekerja 100,000.00 30,000.00
TENAGA
0.0100 OH Mandor 200,000.00 2,000.00
BAHAN 1.2000 M³ Pasir Urug 198,100.00 237,720.00
JUMLAH HARGA 269,720.00
OVERHEAD & PROFIT 15 % 40,458.00
HARGA SATUAN PEKERJAAN 310,178.00

5 1 m3 Urug Pasir Bawah Pondasi Telapak AHSP CK A.2.3.1.11 310,178.00


0.3000 OH Pekerja 100,000.00 30,000.00
TENAGA
0.0100 OH Mandor 200,000.00 2,000.00
BAHAN 1.2000 M³ Pasir Urug 198,100.00 237,720.00
JUMLAH HARGA 269,720.00
OVERHEAD & PROFIT 15 % 40,458.00
HARGA SATUAN PEKERJAAN 310,178.00

6 1 m3 Urug Pasir Bawah Rabat Beton Keliling AHSP CK A.2.3.1.11 310,178.00


0.3000 OH Pekerja 100,000.00 30,000.00
TENAGA
0.0100 OH Mandor 200,000.00 2,000.00
BAHAN 1.2000 M³ Pasir Urug 198,100.00 237,720.00
JUMLAH HARGA 269,720.00
OVERHEAD & PROFIT 15 % 40,458.00
HARGA SATUAN PEKERJAAN 310,178.00

5 1 m3 Urug Tanah Peninggian Lantai AHSP CK A.2.3.1.11 241,730.00


0.3000 OH Pekerja 100,000.00 30,000.00
TENAGA
0.0100 OH Mandor 200,000.00 2,000.00
BAHAN 1.2000 M³ Tanah Urug 148,500.00 178,200.00
JUMLAH HARGA 210,200.00
OVERHEAD & PROFIT 15 % 31,530.00
HARGA SATUAN PEKERJAAN 241,730.00
PEKERJAAN PONDASI

6 1 m3 Pondasi Batu Kosong (Aanstamping) AHSP CK A.3.2.1.9 682,345.83


0.7800 OH Pekerja 100,000.00 78,000.00
0.3900 OH Tukang Batu 150,000.00 58,500.00
TENAGA
0.0390 OH Kepala Tukang 175,000.00 6,825.00
0.0390 OH Mandor 200,000.00 7,800.00
1.2000 M³ Batu Kali 297,200.00 356,640.00
BAHAN
0.4320 M³ Pasir Urug 198,100.00 85,579.20
JUMLAH HARGA 593,344.20
OVERHEAD & PROFIT 15 % 89,001.63
HARGA SATUAN PEKERJAAN 682,345.83

7 1 m3 Pondasi Batu Kali 1 PC : 5 Psr AHSP CK A.3.2.1.3 1,160,754.11


1.5000 OH Pekerja 100,000.00 150,000.00
0.7500 OH Tukang Batu 150,000.00 112,500.00
TENAGA
0.0750 OH Kepala Tukang 175,000.00 13,125.00
0.0750 OH Mandor 200,000.00 15,000.00
1.2000 M³ Batu Kali 297,200.00 356,640.00
BAHAN 136.0000 Kg Semen Portland (PC) 1,672.00 227,392.00
0.5440 M³ Pasir Pasang 247,600.00 134,694.40
JUMLAH HARGA 1,009,351.40
OVERHEAD & PROFIT 15 % 151,402.71
HARGA SATUAN PEKERJAAN 1,160,754.11

PEKERJAAN DINDING

8 1 m2 Dinding Bata Merah 1 PC : 5 Psr 233,538.50


0.3000 OH Pekerja 100,000.00 30,000.00
0.1000 OH Tukang Batu 150,000.00 15,000.00
TENAGA
0.0100 OH Kepala Tukang 175,000.00 1,750.00
0.0150 OH Mandor 200,000.00 3,000.00
70.0000 Bh Bata Merah 1,800.00 126,000.00
BAHAN 9.6800 Kg Semen Portland (PC) 1,672.00 16,184.96
0.0450 M³ Pasir Pasang 247,600.00 11,142.00
JUMLAH HARGA 203,076.96
OVERHEAD & PROFIT 15 % 30,461.54
HARGA SATUAN PEKERJAAN 233,538.50

9 1 m2 Dinding Batako 1 PC : 5 Psr 162,006.02


0.3000 OH Pekerja 100,000.00 30,000.00
0.1000 OH Tukang Batu 150,000.00 15,000.00
TENAGA
0.0100 OH Kepala Tukang 175,000.00 1,750.00
0.0150 OH Mandor 200,000.00 3,000.00
24.5000 Bh Batako 2,500.00 61,250.00
BAHAN 11.5000 Kg Semen Portland (PC) 1,672.00 19,228.00
0.0430 M³ Pasir Pasang 247,600.00 10,646.80
JUMLAH HARGA 140,874.80
OVERHEAD & PROFIT 15 % 21,131.22
HARGA SATUAN PEKERJAAN 162,006.02

PEKERJAAN PLESTERAN

10 1 m2 Plesteran 1 PC : 5 Psr, tebal 15 mm AHSP CK A.4.4.2.4 84,214.79


0.3000 OH Pekerja 100,000.00 30,000.00
0.1500 OH Tukang Batu 150,000.00 22,500.00
TENAGA
0.0150 OH Kepala Tukang 175,000.00 2,625.00
0.0150 OH Mandor 200,000.00 3,000.00
5.1840 Kg Semen Portland (PC) 1,672.00 8,667.65
BAHAN
0.0260 M³ Pasir Pasang 247,600.00 6,437.60
JUMLAH HARGA 73,230.25
OVERHEAD & PROFIT 15 % 10,984.54
HARGA SATUAN PEKERJAAN 84,214.79
11 1 m2 Plesteran 1 PC : 3 Psr, tebal 15 mm AHSP CK A.4.4.2.3 88,344.46
0.3000 OH Pekerja 100,000.00 30,000.00
0.1500 OH Tukang Batu 150,000.00 22,500.00
TENAGA
0.0150 OH Kepala Tukang 175,000.00 2,625.00
0.0150 OH Mandor 200,000.00 3,000.00
7.7760 Kg Semen Portland (PC) 1,672.00 13,001.47
BAHAN
0.0230 M³ Pasir Pasang 247,600.00 5,694.80
JUMLAH HARGA 76,821.27
OVERHEAD & PROFIT 15 % 11,523.19
HARGA SATUAN PEKERJAAN 88,344.46

12 1 m2 Acian Dinding AHSP CK A.4.4.2.27 50,811.60


0.2000 OH Pekerja 100,000.00 20,000.00
0.1000 OH Tukang Batu 150,000.00 15,000.00
TENAGA
0.0100 OH Kepala Tukang 175,000.00 1,750.00
0.0100 OH Mandor 200,000.00 2,000.00
BAHAN 3.2500 Kg Semen Portland (PC) 1,672.00 5,434.00
JUMLAH HARGA 44,184.00
OVERHEAD & PROFIT 15 % 6,627.60
HARGA SATUAN PEKERJAAN 50,811.60

PEKERJAAN BETON

13 1 m3 Rabat Beton Keliling mutu f'c =7,4 Mpa (K-100) AHSP CK A.4.1.1.1 1,280,243.09
1.6500 OH Pekerja 100,000.00 165,000.00
0.2750 OH Tukang Batu 150,000.00 41,250.00
TENAGA
0.0280 OH Kepala Tukang 175,000.00 4,900.00
0.0830 OH Mandor 200,000.00 16,600.00
247.0000 Kg Semen Portland (PC) 1,672.00 412,984.00
869.0000 Kg Pasir Beton 176.86 153,688.86
BAHAN
999.0000 Kg Batu Pecah 2 - 3 cm 297.63 297,332.00
215.0000 Liter Air 100.00 21,500.00
JUMLAH HARGA 1,113,254.86
OVERHEAD & PROFIT 15 % 166,988.23
HARGA SATUAN PEKERJAAN 1,280,243.09

14 1 m3 Rabat Beton Lantai mutu f'c =7,4 Mpa (K-100) AHSP CK A.4.1.1.4 1,177,207.92
1.2000 OH Pekerja 100,000.00 120,000.00
0.2000 OH Pekerja 100,000.00 20,000.00
TENAGA
0.0200 OH Kepala Tukang 175,000.00 3,500.00
0.0600 OH Mandor 200,000.00 12,000.00
230.0000 Kg Semen Portland (PC) 1,672.00 384,560.00
893.0000 Kg Pasir Beton 176.86 157,933.43
BAHAN
1,027.0000 Kg Batu Pecah 2 - 3 cm 297.63 305,665.63
200.0000 Liter Air 100.00 20,000.00
JUMLAH HARGA 1,023,659.06
OVERHEAD & PROFIT 15 % 153,548.86
HARGA SATUAN PEKERJAAN 1,177,207.92

15 1 m3 Beton mutu f'c = 16,9 Mpa (K-200) AHSP CK A.4.1.1.6 1,500,320.48


1.6500 OH Pekerja 100,000.00 165,000.00
0.2750 OH Tukang Batu 150,000.00 41,250.00
TENAGA
0.0280 OH Kepala Tukang 175,000.00 4,900.00
0.0830 OH Mandor 200,000.00 16,600.00
371.0000 Kg Semen Portland (PC) 1,672.00 620,312.00
698.0000 Kg Pasir Beton 176.86 123,446.29
BAHAN
1,047.0000 Kg Batu Pecah 2 - 3 cm 297.63 311,618.22
215.0000 Liter Air 100.00 21,500.00
JUMLAH HARGA 1,304,626.51
OVERHEAD & PROFIT 15 % 195,693.98
HARGA SATUAN PEKERJAAN 1,500,320.48
16 1 m3 Beton mutu f'c = 19,3 Mpa (K-225) AHSP CK A.4.1.1.7 1,500,320.48
1.6500 OH Pekerja 100,000.00 165,000.00
0.2750 OH Tukang Batu 150,000.00 41,250.00
TENAGA
0.0280 OH Kepala Tukang 175,000.00 4,900.00
0.0830 OH Mandor 200,000.00 16,600.00
371.0000 Kg Semen Portland (PC) 1,672.00 620,312.00
698.0000 Kg Pasir Beton 176.86 123,446.29
BAHAN
1,047.0000 Kg Batu Pecah 2 - 3 cm 297.63 311,618.22
215.0000 Liter Air 100.00 21,500.00
JUMLAH HARGA 1,304,626.51
OVERHEAD & PROFIT 15 % 195,693.98
HARGA SATUAN PEKERJAAN 1,500,320.48

17 1 Kg Pembesian dengan Besi Polos atau Ulir AHSP CK A.4.1.1.17 28,944.93


0.0070 OH Pekerja 100,000.00 700.00
0.0070 OH Tukang besi 150,000.00 1,050.00
TENAGA
0.0007 OH Kepala Tukang 175,000.00 122.50
0.0004 OH Mandor 200,000.00 80.00
1.0500 Kg Besi Beton Polos / Ulir 21,800.00 22,890.00
BAHAN
0.0150 Kg Kawat Ikat Beton (Bendrat) 21,800.00 327.00
JUMLAH HARGA 25,169.50
OVERHEAD & PROFIT 15 % 3,775.43
HARGA SATUAN PEKERJAAN 28,944.93

18 1 m2 Bekisting Sloof AHSP CK A.4.1.1.21 224,547.28


0.5200 OH Pekerja 100,000.00 52,000.00
0.2600 OH Tukang Kayu 150,000.00 39,000.00
TENAGA
0.0260 OH Kepala Tukang 175,000.00 4,550.00
0.0260 OH Mandor 200,000.00 5,200.00
0.0450 M³ Kayu Kelas III 1,961,300.00 88,258.50
BAHAN 0.3000 Kg Paku 5 - 12 cm 14,800.00 4,440.00
0.1000 Liter Minyak Bekisting 18,100.00 1,810.00
JUMLAH HARGA 195,258.50
OVERHEAD & PROFIT 15 % 29,288.78
HARGA SATUAN PEKERJAAN 224,547.28

19 1 m2 Bekisting Kolom AHSP CK A.4.1.1.22 417,238.40


0.6600 OH Pekerja 100,000.00 66,000.00
0.3300 OH Tukang Kayu 150,000.00 49,500.00
TENAGA
0.0330 OH Kepala Tukang 175,000.00 5,775.00
0.0330 OH Mandor 200,000.00 6,600.00
0.0400 M³ Kayu Kelas III 1,961,300.00 78,452.00
0.4000 Kg Paku 5 - 12 cm 14,800.00 5,920.00
0.2000 Liter Minyak Bekisting 18,100.00 3,620.00
BAHAN
0.0150 M³ Balok Kayu Kelas II 2,733,600.00 41,004.00
0.3500 Lbr Plywood 9 mm 166,700.00 58,345.00
2.0000 Btg Dolken Kayu Ø 8 - 10 cm, p = 4 m 23,800.00 47,600.00
JUMLAH HARGA 362,816.00
OVERHEAD & PROFIT 15 % 54,422.40
HARGA SATUAN PEKERJAAN 417,238.40
19 1 m2 Bekisting Pondasi AHSP CK A.4.1.1.20 213,269.80
0.5200 OH Pekerja 100,000.00 52,000.00
0.2600 OH Tukang Kayu 150,000.00 39,000.00
TENAGA
0.0260 OH Kepala Tukang 175,000.00 4,550.00
0.0260 OH Mandor 200,000.00 5,200.00
0.0400 M³ Kayu Kelas III 1,961,300.00 78,452.00
BAHAN 0.3000 Kg Paku 5 - 12 cm 14,800.00 4,440.00
0.1000 Liter Minyak Bekisting 18,100.00 1,810.00
JUMLAH HARGA 185,452.00
OVERHEAD & PROFIT 15 % 27,817.80
HARGA SATUAN PEKERJAAN 213,269.80

20 1 m2 Bekisting untuk plat lantai AHSP CK A.4.1.1.23 526,718.40


0.6600 OH Pekerja 100,000.00 66,000.00
0.3300 OH Tukang Kayu 150,000.00 49,500.00
TENAGA
0.0330 OH Kepala Tukang 175,000.00 5,775.00
0.0330 OH Mandor 200,000.00 6,600.00
0.0400 M³ Kayu Kelas III 1,961,300.00 78,452.00
0.4000 Kg Paku 5 - 12 cm 14,800.00 5,920.00
0.2000 Liter Minyak Bekisting 18,100.00 3,620.00
BAHAN
0.0150 M³ Balok Kayu Kelas II 2,733,600.00 41,004.00
0.3500 Lbr Plywood 9 mm 166,700.00 58,345.00
6.0000 Btg Dolken Kayu Ø 8 - 10 cm, p = 4 m 23,800.00 142,800.00
JUMLAH HARGA 458,016.00
OVERHEAD & PROFIT 15 % 68,702.40
HARGA SATUAN PEKERJAAN 526,718.40

21 1 m2 Bekisting untuk dinding AHSP CK A.4.1.1.25 465,141.65


0.6600 OH Pekerja 100,000.00 66,000.00
0.3300 OH Tukang Kayu 150,000.00 49,500.00
TENAGA
0.0330 OH Kepala Tukang 175,000.00 5,775.00
0.0330 OH Mandor 200,000.00 6,600.00
0.0300 M³ Kayu Kelas III 1,961,300.00 58,839.00
0.4000 Kg Paku 5 - 12 cm 14,800.00 5,920.00
0.2000 Liter Minyak Bekisting 18,100.00 3,620.00
BAHAN
0.0200 M³ Balok Kayu Kelas II 2,733,600.00 54,672.00
0.3500 Lbr Plywood 9 mm 166,700.00 58,345.00
4.0000 Btg Dolken Kayu Ø 8 - 10 cm, p = 4 m 23,800.00 95,200.00
JUMLAH HARGA 404,471.00
OVERHEAD & PROFIT 15 % 60,670.65
HARGA SATUAN PEKERJAAN 465,141.65

20 1 m2 Bekisting Balok AHSP CK A.4.1.1.23 426,669.32


0.6600 OH Pekerja 100,000.00 66,000.00
0.3300 OH Tukang Kayu 150,000.00 49,500.00
TENAGA
0.0330 OH Kepala Tukang 175,000.00 5,775.00
0.0330 OH Mandor 200,000.00 6,600.00
0.0400 M³ Kayu Kelas III 1,961,300.00 78,452.00
0.4000 Kg Paku 5 - 12 cm 14,800.00 5,920.00
0.2000 Liter Minyak Bekisting 18,100.00 3,620.00
BAHAN
0.0180 M³ Balok Kayu Kelas II 2,733,600.00 49,204.80
0.3500 Lbr Plywood 9 mm 166,700.00 58,345.00
2.0000 Btg Dolken Kayu Ø 8 - 10 cm, p = 4 m 23,800.00 47,600.00
JUMLAH HARGA 371,016.80
OVERHEAD & PROFIT 15 % 55,652.52
HARGA SATUAN PEKERJAAN 426,669.32
21 1 m1 Kolom Praktis Beton Bertulang (11 x 11) cm AHSP CK A.4.1.1.35 139,974.32
0.1800 OH Pekerja 100,000.00 18,000.00
0.0200 OH Tukang Batu 150,000.00 3,000.00
0.0200 OH Tukang Kayu 150,000.00 3,000.00
TENAGA
0.0200 OH Tukang Besi 150,000.00 3,000.00
0.0060 OH Kepala Tukang 175,000.00 1,050.00
0.0090 OH Mandor 200,000.00 1,800.00
0.0020 M³ Kayu Kelas III 1,961,300.00 3,922.60
0.0100 Kg Paku 5 - 12 cm 14,800.00 148.00
0.0440 Liter Minyak Bekisting 18,100.00 796.40
3.0000 Kg Besi Beton Polos 21,800.00 65,400.00
BAHAN
0.4500 Kg Kawat Ikat Beton (Bendrat) 21,800.00 9,810.00
4.0000 Kg Semen Portland (PC) 1,672.00 6,688.00
0.0060 M³ Pasir Beton 247,600.00 1,485.60
0.0090 M³ Batu Pecah 2 - 3 cm 401,800.00 3,616.20
JUMLAH HARGA 121,716.80
OVERHEAD & PROFIT 15 % 18,257.52
HARGA SATUAN PEKERJAAN 139,974.32

22 1 m1 Ring Balok Beton Bertulang (10 x 15) cm AHSP CK A.4.1.1.36 185,901.30


0.2970 OH Pekerja 100,000.00 29,700.00
0.0330 OH Tukang Batu 150,000.00 4,950.00
0.0330 OH Tukang Kayu 150,000.00 4,950.00
TENAGA
0.0330 OH Tukang Besi 150,000.00 4,950.00
0.0100 OH Kepala Tukang 175,000.00 1,750.00
0.0150 OH Mandor 200,000.00 3,000.00
0.0030 M³ Kayu Kelas III 1,961,300.00 5,883.90
0.0200 Kg Paku 5 - 12 cm 14,800.00 296.00
0.0600 Liter Minyak Bekisting 18,100.00 1,086.00
3.9700 Kg Besi Beton Polos 21,800.00 86,546.00
BAHAN
0.0500 Kg Kawat Ikat Beton (Bendrat) 21,800.00 1,090.00
5.5000 Kg Semen Portland (PC) 1,672.00 9,196.00
0.0090 M³ Pasir Beton 247,600.00 2,228.40
0.0150 M³ Batu Pecah 2 - 3 cm 401,800.00 6,027.00
JUMLAH HARGA 161,653.30
OVERHEAD & PROFIT 15 % 24,248.00
HARGA SATUAN PEKERJAAN 185,901.30

23 1 m1 Balok Latai Beton Bertulang (10 x 15) cm AHSP CK A.4.1.1.36 176,625.40


0.2970 OH Pekerja 100,000.00 29,700.00
0.0330 OH Tukang Batu 150,000.00 4,950.00
0.0330 OH Tukang Kayu 150,000.00 4,950.00
TENAGA
0.0330 OH Tukang Besi 150,000.00 4,950.00
0.0100 OH Kepala Tukang 175,000.00 1,750.00
0.0150 OH Mandor 200,000.00 3,000.00
0.0030 M³ Kayu Kelas III 1,961,300.00 5,883.90
0.0200 Kg Paku 5 - 12 cm 14,800.00 296.00
0.0600 Liter Minyak Bekisting 18,100.00 1,086.00
3.6000 Kg Besi Beton Polos 21,800.00 78,480.00
BAHAN
0.0500 Kg Kawat Ikat Beton (Bendrat) 21,800.00 1,090.00
5.5000 Kg Semen Portland (PC) 1,672.00 9,196.00
0.0090 M³ Pasir Beton 247,600.00 2,228.40
0.0150 M³ Batu Pecah 2 - 3 cm 401,800.00 6,027.00
JUMLAH HARGA 153,587.30
OVERHEAD & PROFIT 15 % 23,038.10
HARGA SATUAN PEKERJAAN 176,625.40
PEKERJAAN KAYU

24 1 m3 Kusen Pintu & Jendela, Kayu Kelas II AHSP CK A.4.6.1.1 8,489,024.00


7.0000 OH Pekerja 100,000.00 700,000.00
21.0000 OH Tukang Kayu 150,000.00 3,150,000.00
TENAGA
2.1000 OH Kepala Tukang 175,000.00 367,500.00
0.3500 OH Mandor 200,000.00 70,000.00
1.1000 M³ Balok Kayu Kelas II 2,733,600.00 3,006,960.00
BAHAN 1.2500 Kg Paku 10 cm 14,800.00 18,500.00
1.0000 Kg Lem kayu 68,800.00 68,800.00
JUMLAH HARGA 7,381,760.00
OVERHEAD & PROFIT 15 % 1,107,264.00
HARGA SATUAN PEKERJAAN 8,489,024.00

25 1 m2 Daun Pintu Panel, Kayu Kelas II AHSP CK A.4.6.1.5 874,920.00


1.0000 OH Pekerja 100,000.00 100,000.00
3.0000 OH Tukang Kayu 150,000.00 450,000.00
TENAGA
0.3000 OH Kepala Tukang 175,000.00 52,500.00
0.0500 OH Mandor 200,000.00 10,000.00
0.0400 M³ Papan Kayu Kelas II 2,847,500.00 113,900.00
BAHAN
0.5000 Kg Lem kayu 68,800.00 34,400.00
JUMLAH HARGA 760,800.00
OVERHEAD & PROFIT 15 % 114,120.00
HARGA SATUAN PEKERJAAN 874,920.00

26 1 m2 Jendela Jalusi Kayu Kelas II AHSP CK A.4.6.1.10 747,695.50


0.6700 OH Pekerja 100,000.00 67,000.00
2.0000 OH Tukang Kayu 150,000.00 300,000.00
TENAGA
0.2000 OH Kepala Tukang 175,000.00 35,000.00
0.3350 OH Mandor 200,000.00 67,000.00
BAHAN 0.0600 M³ Papan Kayu Kelas II 2,847,500.00 170,850.00
0.1500 Kg Lem kayu 68,800.00 10,320.00
JUMLAH HARGA 650,170.00
OVERHEAD & PROFIT 15 % 97,525.50
HARGA SATUAN PEKERJAAN 747,695.50

27 1 m3 Kuda-Kuda Kayu Kelas I AHSP CK A.4.6.1.13 12,922,009.50


4.0000 OH Pekerja 100,000.00 400,000.00
12.0000 OH Tukang Kayu 150,000.00 1,800,000.00
TENAGA
1.2000 OH Kepala Tukang 175,000.00 210,000.00
0.2000 OH Mandor 200,000.00 40,000.00
1.1000 M³ Balok Kayu Kelas I 7,688,300.00 8,457,130.00
BAHAN 15.0000 Kg Besi Strip tebal 5 mm 15,800.00 237,000.00
5.6000 Kg Paku 12 cm 16,500.00 92,400.00
JUMLAH HARGA 11,236,530.00
OVERHEAD & PROFIT 15 % 1,685,479.50
HARGA SATUAN PEKERJAAN 12,922,009.50

28 1 m3 Gording Kayu Kelas II AHSP CK A.4.6.1.15 8,506,791.50


6.7000 OH Pekerja 100,000.00 670,000.00
20.1000 OH Tukang Kayu 150,000.00 3,015,000.00
TENAGA
2.0100 OH Kepala Tukang 175,000.00 351,750.00
0.3350 OH Mandor 200,000.00 67,000.00
1.1000 M³ Balok Kayu Kelas II 2,733,600.00 3,006,960.00
BAHAN 15.0000 Kg Besi Strip tebal 5 mm 15,800.00 237,000.00
3.0000 Kg Paku 12 cm 16,500.00 49,500.00
JUMLAH HARGA 7,397,210.00
OVERHEAD & PROFIT 15 % 1,109,581.50
HARGA SATUAN PEKERJAAN 8,506,791.50

29 1 m3 Tiang Kayu Kelas I 5,346,330.24


10.0000 OH Pekerja 100,000.00 1,000,000.00
20.0000 OH Tukang Kayu 150,000.00 3,000,000.00
TENAGA
2.0000 OH Kepala Tukang 175,000.00 350,000.00
0.5000 OH Mandor 200,000.00 100,000.00
0.0254 M³ Balok Kayu Kelas I 7,688,300.00 195,282.82
BAHAN
0.2500 Kg Paku 5 - 10 cm 14,800.00 3,700.00
JUMLAH HARGA 4,648,982.82
OVERHEAD & PROFIT 15 % 697,347.42
HARGA SATUAN PEKERJAAN 5,346,330.24
30 1 m3 Balok Kayu Kelas I 5,346,330.24
10.0000 OH Pekerja 100,000.00 1,000,000.00
20.0000 OH Tukang Kayu 150,000.00 3,000,000.00
TENAGA
2.0000 OH Kepala Tukang 175,000.00 350,000.00
0.5000 OH Mandor 200,000.00 100,000.00
0.0254 M³ Balok Kayu Kelas I 7,688,300.00 195,282.82
BAHAN
0.2500 Kg Paku 5 - 10 cm 14,800.00 3,700.00
JUMLAH HARGA 4,648,982.82
OVERHEAD & PROFIT 15 % 697,347.42
HARGA SATUAN PEKERJAAN 5,346,330.24
PEKERJAAN ATAP

29 1 m2 Atap Zincalume 0,35 mm 145,668.20


0.1200 OH Pekerja 100,000.00 12,000.00
0.0600 OH Tukang Kayu 150,000.00 9,000.00
TENAGA
0.0060 OH Kepala Tukang 175,000.00 1,050.00
0.0060 OH Mandor 200,000.00 1,200.00
1.0500 Lbr Zincalume 0,35 mm 97,800.00 102,690.00
BAHAN
0.0200 Kg Paku Sekrup 36,400.00 728.00
JUMLAH HARGA 126,668.00
OVERHEAD & PROFIT 15 % 19,000.20
HARGA SATUAN PEKERJAAN 145,668.20

30 1 m1 Nok Zincalume 0,35 mm 104,024.40


0.1500 OH Pekerja 100,000.00 15,000.00
0.0700 OH Tukang Kayu 150,000.00 10,500.00
TENAGA
0.0080 OH Kepala Tukang 175,000.00 1,400.00
0.0060 OH Mandor 200,000.00 1,200.00
1.0500 M¹ Nok Zincalume 0,35 mm 58,000.00 60,900.00
BAHAN
0.0400 Kg Paku Sekrup 36,400.00 1,456.00
JUMLAH HARGA 90,456.00
OVERHEAD & PROFIT 15 % 13,568.40
HARGA SATUAN PEKERJAAN 104,024.40

31 1 m1 Lisplank GRC 2 x 20 cm AHSP CK A.4.6.1.22 71,863.50


0.1000 OH Pekerja 100,000.00 10,000.00
0.2000 OH Tukang Kayu 150,000.00 30,000.00
TENAGA
0.0200 OH Kepala Tukang 175,000.00 3,500.00
0.0050 OH Mandor 200,000.00 1,000.00
1.1000 M¹ Lisplank GRC 2 x 20 cm 14,700.00 16,170.00
BAHAN
0.0500 Kg Paku Sekrup 36,400.00 1,820.00
JUMLAH HARGA 62,490.00
OVERHEAD & PROFIT 15 % 9,373.50
HARGA SATUAN PEKERJAAN 71,863.50

32 1 m2 Pasang GRC 4 mm Penutup Kuda-Kuda 236,427.35


0.3000 OH Pekerja 100,000.00 30,000.00
0.3500 OH Tukang Kayu 150,000.00 52,500.00
TENAGA
0.0350 OH Kepala Tukang 175,000.00 6,125.00
0.0150 OH Mandor 200,000.00 3,000.00
1.2500 M² GRC 4 mm 83,600.00 104,500.00
BAHAN
0.2600 Kg Paku Sekrup 36,400.00 9,464.00
JUMLAH HARGA 205,589.00
OVERHEAD & PROFIT 15 % 30,838.35
HARGA SATUAN PEKERJAAN 236,427.35

PEKERJAAN KUNCI DAN KACA

33 1 Bh Pasang Kunci Tanam 2 Slaag AHSP CK A.4.6.2.2 354,947.50


0.0100 OH Pekerja 100,000.00 1,000.00
0.5000 OH Tukang Kayu 150,000.00 75,000.00
TENAGA
0.0500 OH Kepala Tukang 175,000.00 8,750.00
0.0050 OH Mandor 200,000.00 1,000.00
BAHAN 1.0000 Bh Kunci Tanam 2 Slaag 222,900.00 222,900.00
JUMLAH HARGA 308,650.00
OVERHEAD & PROFIT 15 % 46,297.50
HARGA SATUAN PEKERJAAN 354,947.50
34 1 Bh Pasang Engsel Pintu AHSP CK A.4.6.2.5 70,696.25
0.0150 OH Pekerja 100,000.00 1,500.00
0.1500 OH Tukang Kayu 150,000.00 22,500.00
TENAGA
0.0150 OH Kepala Tukang 175,000.00 2,625.00
0.0008 OH Mandor 200,000.00 150.00
BAHAN 1.0000 Bh Engsel Pintu 34,700.00 34,700.00
JUMLAH HARGA 61,475.00
OVERHEAD & PROFIT 15 % 9,221.25
HARGA SATUAN PEKERJAAN 70,696.25

PEKERJAAN PENGECATAN

35 1 m2 Cat Lisplank dengan Roof Paint 32,784.78


0.0200 OH Pekerja 100,000.00 2,000.00
0.0630 OH Tukang Cat 150,000.00 9,450.00
TENAGA
0.0063 OH Kepala Tukang 175,000.00 1,102.50
0.0030 OH Mandor 200,000.00 600.00
0.1000 Kg Cat Dasar Roof Paint 39,600.00 3,960.00
BAHAN
0.2600 Kg Cat Penutup Roof Paint 39,600.00 10,296.00
ALAT 1.0000 Ls Alat Bantu Pengecatan 1,100.00 1,100.00
JUMLAH HARGA 28,508.50
OVERHEAD & PROFIT 15 % 4,276.28
HARGA SATUAN PEKERJAAN 32,784.78

36 1 m2 Cat Tembok AHSP CK A.4.7.1.10 38,470.38


0.0200 OH Pekerja 100,000.00 2,000.00
0.0630 OH Tukang Cat 150,000.00 9,450.00
TENAGA
0.0063 OH Kepala Tukang 175,000.00 1,102.50
0.0030 OH Mandor 200,000.00 600.00
0.1000 Kg Plamur 24,800.00 2,480.00
BAHAN 0.1000 Kg Cat Dasar Tembok 49,500.00 4,950.00
0.2600 Kg Cat Penutup Tembok 49,500.00 12,870.00
JUMLAH HARGA 33,452.50
OVERHEAD & PROFIT 15 % 5,017.88
HARGA SATUAN PEKERJAAN 38,470.38

37 1 m2 Cat Plafond AHSP CK A.4.7.1.10 39,735.38


0.0200 OH Pekerja 100,000.00 2,000.00
0.0630 OH Tukang Cat 150,000.00 9,450.00
TENAGA
0.0063 OH Kepala Tukang 175,000.00 1,102.50
0.0030 OH Mandor 200,000.00 600.00
0.1000 Kg Plamur 24,800.00 2,480.00
BAHAN 0.1000 Kg Cat Dasar Tembok 49,500.00 4,950.00
0.2600 Kg Cat Penutup Tembok 49,500.00 12,870.00
ALAT 1.0000 Ls Alat Bantu Pengecatan 1,100.00 1,100.00
JUMLAH HARGA 34,552.50
OVERHEAD & PROFIT 15 % 5,182.88
HARGA SATUAN PEKERJAAN 39,735.38

PEKERJAAN LISTRIK

38 1 Titik Instalasi Lampu Penerangan 375,532.50


0.3600 OH Pekerja 100,000.00 36,000.00
0.6000 OH Tukang Listrik 150,000.00 90,000.00
TENAGA
0.0600 OH Kepala Tukang 175,000.00 10,500.00
0.0180 OH Mandor 200,000.00 3,600.00
8.0000 M¹ Kabel NYM 3 x 2,5mm 17,200.00 137,600.00
3.0000 M¹ Pipa Listrik PVC 5/8'' 7,500.00 22,500.00
BAHAN 1.0000 Bh Tee Doz 11,500.00 11,500.00
0.2000 Bh Isolasi Listrik 5,100.00 1,020.00
0.3000 Kg Paku Klem Listrik 46,100.00 13,830.00
JUMLAH HARGA 326,550.00
OVERHEAD & PROFIT 15 % 48,982.50
HARGA SATUAN PEKERJAAN 375,532.50
39 1 Titik Instalasi Stop Kontak 375,532.50
0.3600 OH Pekerja 100,000.00 36,000.00
0.6000 OH Tukang Listrik 150,000.00 90,000.00
TENAGA
0.0600 OH Kepala Tukang 175,000.00 10,500.00
0.0180 OH Mandor 200,000.00 3,600.00
8.0000 M¹ Kabel NYM 3 x 2,5mm 17,200.00 137,600.00
3.0000 M¹ Pipa Listrik PVC 5/8'' 7,500.00 22,500.00
BAHAN 1.0000 Bh Tee Doz 11,500.00 11,500.00
0.2000 Bh Isolasi Listrik 5,100.00 1,020.00
0.3000 Kg Paku Klem Listrik 46,100.00 13,830.00
JUMLAH HARGA 326,550.00
OVERHEAD & PROFIT 15 % 48,982.50
HARGA SATUAN PEKERJAAN 375,532.50

40 1 Bh Pasang Lampu SL 18 Watt + Veeting 115,373.75


0.0150 OH Pekerja 100,000.00 1,500.00
0.1500 OH Tukang Listrik 150,000.00 22,500.00
TENAGA
0.0150 OH Kepala Tukang 175,000.00 2,625.00
0.0075 OH Mandor 200,000.00 1,500.00
1.0000 Bh Lampu SL 18 Watt 51,800.00 51,800.00
BAHAN
1.0000 Bh Veeting Tempel 20,400.00 20,400.00
JUMLAH HARGA 100,325.00
OVERHEAD & PROFIT 15 % 15,048.75
HARGA SATUAN PEKERJAAN 115,373.75

41 1 Bh Pasang Stop Kontak 72,248.75


0.0150 OH Pekerja 100,000.00 1,500.00
0.1500 OH Tukang Listrik 150,000.00 22,500.00
TENAGA
0.0150 OH Kepala Tukang 175,000.00 2,625.00
0.0075 OH Mandor 200,000.00 1,500.00
BAHAN 1.0000 Bh Stop Kontak 34,700.00 34,700.00
JUMLAH HARGA 62,825.00
OVERHEAD & PROFIT 15 % 9,423.75
HARGA SATUAN PEKERJAAN 72,248.75

42 1 Bh Pasang Saklar Tunggal 78,803.75


0.0150 OH Pekerja 100,000.00 1,500.00
0.1500 OH Tukang Listrik 150,000.00 22,500.00
TENAGA
0.0150 OH Kepala Tukang 175,000.00 2,625.00
0.0075 OH Mandor 200,000.00 1,500.00
BAHAN 1.0000 Bh Saklar Tunggal 40,400.00 40,400.00
JUMLAH HARGA 68,525.00
OVERHEAD & PROFIT 15 % 10,278.75
HARGA SATUAN PEKERJAAN 78,803.75

43 1 Bh Pasang Saklar Ganda 91,913.75


0.0150 OH Pekerja 100,000.00 1,500.00
0.1500 OH Tukang Listrik 150,000.00 22,500.00
TENAGA
0.0150 OH Kepala Tukang 175,000.00 2,625.00
0.0075 OH Mandor 200,000.00 1,500.00
BAHAN 1.0000 Bh Saklar Ganda 51,800.00 51,800.00
JUMLAH HARGA 79,925.00
OVERHEAD & PROFIT 15 % 11,988.75
HARGA SATUAN PEKERJAAN 91,913.75
44 1 m2 Plafond Kalsi Board, tebal 6 mm CK A.4.5.1.5 Rp 74,913
0.1000 OH Pekerja 100,000.00 Rp 10,000.00
0.1000 OH Tukang Kayu 150,000.00 Rp 15,000.00
TENAGA
0.0100 OH Kepala Tukang 175,000.00 Rp 1,750.00
0.0050 OH Mandor 200,000.00 Rp 1,000.00
0.3750 Lbr Kalsi Board 6 mm 96,800.00 Rp 36,300.00
BAHAN
0.0300 Kg Paku Sekrup 36,400.00 Rp 1,092.00
JUMLAH HARGA Rp 65,142.00
OVERHEAD & PROFIT 15 % Rp 9,771.30
HARGA SATUAN PEKERJAAN Rp 74,913.30

45 1 m2 Rangka Plafond Besi Hollow 4/4 CK A.4.2.1.21 Rp 26,853


0.3500 OH Pekerja 100,000.00 Rp 35,000.00
0.3500 OH Tukang Besi 150,000.00 Rp 52,500.00
TENAGA
0.0350 OH Kepala Tukang 175,000.00 Rp 6,125.00
0.0180 OH Mandor 200,000.00 Rp 3,600.00
1.0500 M¹ Rangka Hollow Galvalum 40 x 40 mm 39,900.00 Rp 41,895.00
BAHAN
100.0 % Aksessoris (Perkuatan, dll) Rp 39,900.00 Rp 39,900.00
JUMLAH HARGA Rp 179,020.00
OVERHEAD & PROFIT 15 % Rp 26,853.00

46 1 m1 Pek. List Plafond 10 cm CK A.4.5.1.5 Rp 51,371


0.0600 OH Pekerja Rp 100,000.00 Rp 6,000.00
0.0600 OH Tukang Kayu Rp 150,000.00 Rp 9,000.00
TENAGA
0.0060 OH Kepala Tukang Rp 175,000.00 Rp 1,050.00
0.0030 OH Mandor Rp 200,000.00 Rp 600.00
1.0500 M¹ List Plafond Gypsum 17,100.00 Rp 17,955.00
BAHAN
0.1500 Kg Tepung Gypsum 67,100.00 Rp 10,065.00
JUMLAH HARGA Rp 44,670.00
OVERHEAD & PROFIT 15 % Rp 6,700.50
HARGA SATUAN PEKERJAAN Rp 51,370.50
DAFTAR HARGA UPAH DAN BAHAN

No. UPAH / BAHAN SATUAN HARGA SATUAN

HARGA UPAH

1 Mandor OH Rp 200,000.00
2 Kepala Tukang OH Rp 175,000.00
3 Tukang Batu OH Rp 150,000.00
4 Tukang Kayu OH Rp 150,000.00
5 Tukang Besi OH Rp 150,000.00
6 Tukang Cat OH Rp 150,000.00
7 Tukang Listrik OH Rp 150,000.00
8 Tukang Las OH Rp 150,000.00
9 Tukang Khusus Aluminium OH Rp 150,000.00
10 Pekerja OH Rp 100,000.00

HARGA BAHAN

1 Batu Kali M3 Rp 297,200.00


2 Batu Pecah 2 - 3 cm M3 Rp 401,800.00
3 Pasir Pasang M3 Rp 247,600.00
4 Pasir Beton M3 Rp 247,600.00
5 Pasir Urug M3 Rp 198,100.00
6 Tanah Urug M3 Rp 148,500.00
7 Air Ltr Rp 100.00
8 Semen Portland @ 50 Kg (PC) Sak Rp 83,600.00
9 Semen Portland (PC) Kg Rp 1,672.00
10 Semen Khusus Bata Ringan Kg Rp 6,300.00
11 Semen Warna Kg Rp 2,200.00
12 Besi Beton Polos / Ulir Kg Rp 21,800.00
13 Besi Beton Polos Kg Rp 21,800.00
14 Besi Angkur Ø 8 mm Kg Rp 15,200.00
15 Kawat Ikat Beton (Bendrat) Kg Rp 21,800.00
16 Besi Beton Ø 10 mm Kg Rp 23,800.00
17 Besi Beton Ø 12 mm Kg Rp 26,100.00
18 Besi Strip tebal 5 mm Kg Rp 15,800.00
19 Bata Merah Bh Rp 1,800.00
20 Batako Bh Rp 2,500.00
21 Balok Kayu Kelas I M3 Rp 7,688,300.00
22 Papan Kayu Kelas I M3 Rp 7,802,200.00
23 Balok Kayu Kelas II M3 Rp 2,733,600.00
24 Kayu Kasau 5 x 7 cm M3 Rp 2,357,500.00
25 Papan Kayu Kelas II M3 Rp 2,847,500.00
26 Balok Kayu 5 x 7 cm Kelas II M3 Rp 2,847,500.00
27 Kayu Kelas III M3 Rp 1,961,300.00
28 Balok Kayu 5 x 7 cm Kelas III M3 Rp 1,961,300.00
29 Papan Kayu Kelas III M3 Rp 1,961,300.00
30 Dolken Kayu Ø 8 - 10 cm, p = 4 m Btg Rp 23,800.00
31 Paku 1 - 2,5 cm Kg Rp 14,300.00
32 Paku 5 - 7 cm Kg Rp 14,800.00
No. UPAH / BAHAN SATUAN HARGA SATUAN

33 Paku 5 - 10 cm Kg Rp 14,800.00
34 Paku 5 - 12 cm Kg Rp 14,800.00
35 Paku 7 - 10 cm Kg Rp 14,800.00
36 Paku 10 cm Kg Rp 14,800.00
37 Paku 12 cm Kg Rp 16,500.00
38 Paku Tripleks Kg Rp 14,300.00
39 Paku Sekrup Kg Rp 36,400.00
40 Sekrup Fischer Bh Rp 1,000.00
41 Plywood 4 mm Lbr Rp 85,700.00
42 Plywood 9 mm Lbr Rp 166,700.00
43 Tripleks 3 mm Lbr Rp 86,400.00
44 Plywood tebal 4 mm uk. 90 x 220 cm Lbr Rp 92,100.00
45 GRC 4 mm Lbr Rp 83,600.00
46 List Profil Gypsum M Rp 20,400.00
47 List Langit-Langit Kayu Profil, Kayu Kelas II M Rp 13,000.00
48 Tepung Gypsum Kg Rp 67,100.00
49 Lisplank GRC 2 x 20 cm M Rp 14,700.00
50 Lem Kayu Kg Rp 68,800.00
51 Zincalume 0,35 mm Lbr Rp 97,800.00
52 Nok Zincalume 0,35 mm M Rp 58,000.00
53 Cat Meni Besi Kg Rp 19,800.00
54 Cat Meni kayu Kg Rp 19,800.00
55 Cat Dasar Kayu Kg Rp 44,600.00
56 Cat Penutup Kayu Kg Rp 44,600.00
57 Pengencer Cat / Thinner Kg Rp 29,700.00
58 Amplas Lbr Rp 4,900.00
59 Cat Dasar Roof Paint Kg Rp 39,600.00
60 Cat Penutup Roof Paint Kg Rp 39,600.00
61 Cat Dasar Tembok Kg Rp 49,500.00
62 Cat Penutup Tembok Kg Rp 49,500.00
63 Plamur Kg Rp 24,800.00
64 Roll Kg Rp 29,700.00
65 Kuas Kg Rp 14,900.00
66 Alat Bantu Pengecatan Kg Rp 1,100.00
67 Minyak Bekisting Kg Rp 18,100.00
68 Engsel Pintu Psg Rp 34,700.00
69 Kunci Tanam 2 Slaag bh Rp 222,900.00
70 Veeting Tempel Bh Rp 20,400.00
71 Lampu SL 18 Watt Bh Rp 51,800.00
72 Saklar Tunggal Bh Rp 40,400.00
73 Saklar Ganda Bh Rp 51,800.00
74 Stop Kontak Bh Rp 34,700.00
75 Paku Klem Listrik Kg Rp 46,100.00
76 Pipa Listrik PVC 5/8'' M Rp 7,500.00
77 Kabel NYM 3 x 2,5mm M Rp 17,200.00
78 Tee Doz Bh Rp 11,500.00
79 Isolasi Listrik Bh Rp 5,100.00
80 Penyambungan Daya 1300 Watt Unit Rp 1,993,300.00
81 Kalsi Board 6 mm Lmbr Rp 96,800.00
82 Rangka Hollow Galvalum 40 x 40 mm M Rp 39,900.00
83 List Plafond Gypsum M Rp 17,100.00
ALUR HARGA BAHAN & UPAH KERJA

No URAIAN SATUAN HARGA BELI ONGKOS ONGKOS HARGA DI GALIAN C JUMLAH


DI QUARY ANGKUT NAIK/TURUN LOKASI 20% x BJ x (4) HARGA
PROYEK
(1) (2) (3) (4) (5) (6) (7 = 4+5+6) (8) (9 = 7+8)

UPAH KERJA
1 Mandor OH 200,000.00 - 200,000.00 200,000.00
2 Kepala Tukang OH 175,000.00 - 175,000.00 175,000.00
3 Tukang Batu OH 150,000.00 - 150,000.00 150,000.00
4 Tukang Kayu OH 150,000.00 - 150,000.00 150,000.00
5 Tukang Besi OH 150,000.00 - 150,000.00 150,000.00
6 Tukang Cat OH 150,000.00 - 150,000.00 150,000.00
7 Tukang Listrik OH 150,000.00 - 150,000.00 150,000.00
8 Tukang Las OH 150,000.00 - 150,000.00 150,000.00
9 Tukang Khusus Aluminium OH 150,000.00 - 150,000.00 150,000.00
10 Pekerja OH 100,000.00 - 100,000.00 100,000.00

HARGA BAHAN
1 Batu Kali M3 297,165.10 297,165.10 297,200.00
2 Batu Pecah 2 - 3 cm M3 327,691.44 25,000.00 352,691.44 49,153.72 401,800.00
3 Pasir Pasang M3 247,643.66 247,643.66 247,600.00
4 Pasir Beton M3 247,618.60 247,618.60 247,600.00
5 Pasir Urug M3 198,072.10 198,072.10 198,100.00
6 Tanah Urug M3 148,525.60 148,525.60 148,500.00
7 Air Ltr 113.90 - 113.90 100.00
8 Semen Portland @ 50 Kg (PC) Sak 82,577.50 1,000.00 83,577.50 83,600.00
9 Semen Portland (PC) Kg 1,765.45 20.00 1,785.45 1,672.00
10 Semen Khusus Bata Ringan Kg 5,339.06 1,000.00 6,339.06 6,300.00
11 Semen Warna Kg 2,232.44 - 2,232.44 2,200.00
No URAIAN SATUAN HARGA BELI ONGKOS ONGKOS HARGA DI GALIAN C JUMLAH
DI QUARY ANGKUT NAIK/TURUN LOKASI 20% x BJ x (4) HARGA
PROYEK
(1) (2) (3) (4) (5) (6) (7 = 4+5+6) (8) (9 = 7+8)
12 Besi Beton Polos / Ulir Kg 20,786.75 1,000.00 21,786.75 21,800.00
13 Besi Beton Polos Kg 20,786.75 1,000.00 21,786.75 21,800.00
14 Besi Angkur Ø 8 mm Kg 14,237.50 1,000.00 15,237.50 15,200.00
15 Kawat Ikat Beton (Bendrat) Kg 20,786.75 1,000.00 21,786.75 21,800.00
16 Besi Beton Ø 10 mm Kg 22,780.00 1,000.00 23,780.00 23,800.00
17 Besi Beton Ø 12 mm Kg 25,058.00 1,000.00 26,058.00 26,100.00
18 Besi Strip tebal 5 mm Kg 14,807.00 1,000.00 15,807.00 15,800.00
19 Bata Merah Bh 1,708.50 100.00 1,808.50 1,800.00
20 Batako Bh 2,391.90 100.00 2,491.90 2,500.00
21 Balok Kayu Kelas I M3 7,688,250.00 7,688,250.00 7,688,300.00
22 Papan Kayu Kelas I M3 7,802,150.00 7,802,150.00 7,802,200.00
23 Balok Kayu Kelas II M3 2,733,600.00 2,733,600.00 2,733,600.00
24 Kayu Kasau 5 x 7 cm M3 2,357,502.20 2,357,502.20 2,357,500.00
25 Papan Kayu Kelas II M3 2,847,500.00 2,847,500.00 2,847,500.00
26 Balok Kayu 5 x 7 cm Kelas II M3 2,847,500.00 2,847,500.00 2,847,500.00
27 Kayu Kelas III M3 1,936,300.00 25,000.00 1,961,300.00 1,961,300.00
28 Balok Kayu 5 x 7 cm Kelas III M3 1,936,300.00 25,000.00 1,961,300.00 1,961,300.00
29 Papan Kayu Kelas III M3 1,936,300.00 25,000.00 1,961,300.00 1,961,300.00
30 Dolken Kayu Ø 8 - 10 cm, p = 4 m Btg 22,780.00 1,000.00 23,780.00 23,800.00
31 Paku 1 - 2,5 cm Kg 13,838.85 500.00 14,338.85 14,300.00
32 Paku 5 - 7 cm Kg 14,807.00 14,807.00 14,800.00
33 Paku 5 - 10 cm Kg 14,807.00 14,807.00 14,800.00
34 Paku 5 - 12 cm Kg 14,807.00 14,807.00 14,800.00
35 Paku 7 - 10 cm Kg 14,807.00 14,807.00 14,800.00
36 Paku 10 cm Kg 14,807.00 14,807.00 14,800.00
37 Paku 12 cm Kg 16,515.50 16,515.50 16,500.00
38 Paku Tripleks Kg 13,838.85 500.00 14,338.85 14,300.00
39 Paku Sekrup Kg 35,935.45 500.00 36,435.45 36,400.00
No URAIAN SATUAN HARGA BELI ONGKOS ONGKOS HARGA DI GALIAN C JUMLAH
DI QUARY ANGKUT NAIK/TURUN LOKASI 20% x BJ x (4) HARGA
PROYEK
(1) (2) (3) (4) (5) (6) (7 = 4+5+6) (8) (9 = 7+8)
40 Sekrup Fischer Bh 911.20 50.00 961.20 1,000.00
41 Plywood 4 mm Lbr 85,425.00 250.00 85,675.00 85,700.00
42 Plywood 9 mm Lbr 165,155.00 1,500.00 166,655.00 166,700.00
43 Tripleks 3 mm Lbr 85,425.00 1,000.00 86,425.00 86,400.00
44 Plywood tebal 4 mm uk. 90 x 220 cm Lbr 91,120.00 1,000.00 92,120.00 92,100.00
45 GRC 4 mm Lbr 82,577.50 1,000.00 83,577.50 83,600.00
46 List Profil Gypsum M 19,932.50 500.00 20,432.50 20,400.00
47 List Langit-Langit Kayu Profil, Kayu Kelas II M 12,529.00 500.00 13,029.00 13,000.00
48 Tepung Gypsum Kg 66,631.50 500.00 67,131.50 67,100.00
49 Lisplank GRC 2 x 20 cm M 14,237.50 500.00 14,737.50 14,700.00
50 Lem Kayu Kg 68,340.00 500.00 68,840.00 68,800.00
51 Zincalume 0,35 mm Lbr 96,815.00 1,000.00 97,815.00 97,800.00
52 Nok Zincalume 0,35 mm M 56,950.00 1,000.00 57,950.00 58,000.00
53 Cat Meni Besi Kg 19,306.05 500.00 19,806.05 19,800.00
54 Cat Meni kayu Kg 19,306.05 500.00 19,806.05 19,800.00
55 Cat Dasar Kayu Kg 44,079.30 500.00 44,579.30 44,600.00
56 Cat Penutup Kayu Kg 44,079.30 500.00 44,579.30 44,600.00
57 Pengencer Cat / Thinner Kg 29,215.35 500.00 29,715.35 29,700.00
58 Amplas Lbr 4,897.70 50.00 4,947.70 4,900.00
59 Cat Dasar Roof Paint Kg 39,124.65 500.00 39,624.65 39,600.00
60 Cat Penutup Roof Paint Kg 39,124.65 500.00 39,624.65 39,600.00
61 Cat Dasar Tembok Kg 48,977.00 500.00 49,477.00 49,500.00
62 Cat Penutup Tembok Kg 48,977.00 500.00 49,477.00 49,500.00
63 Plamur Kg 24,260.70 500.00 24,760.70 24,800.00
64 Roll Kg 29,614.00 100.00 29,714.00 29,700.00
65 Kuas Kg 14,750.05 100.00 14,850.05 14,900.00
66 Alat Bantu Pengecatan Kg 1,139.00 - 1,139.00 1,100.00
67 Minyak Bekisting Kg 17,085.00 1,000.00 18,085.00 18,100.00
No URAIAN SATUAN HARGA BELI ONGKOS ONGKOS HARGA DI GALIAN C JUMLAH
DI QUARY ANGKUT NAIK/TURUN LOKASI 20% x BJ x (4) HARGA
PROYEK
(1) (2) (3) (4) (5) (6) (7 = 4+5+6) (8) (9 = 7+8)
68 Engsel Pintu Psg 33,714.40 1,000.00 34,714.40 34,700.00
69 Kunci Tanam 2 Slaag bh 221,877.20 1,000.00 222,877.20 222,900.00
70 Veeting Tempel Bh 19,932.50 500.00 20,432.50 20,400.00
71 Lampu SL 18 Watt Bh 51,255.00 500.00 51,755.00 51,800.00
72 Saklar Tunggal Bh 39,865.00 500.00 40,365.00 40,400.00
73 Saklar Ganda Bh 51,255.00 500.00 51,755.00 51,800.00
74 Stop Kontak Bh 34,170.00 500.00 34,670.00 34,700.00
75 Paku Klem Listrik Kg 45,560.00 500.00 46,060.00 46,100.00
76 Pipa Listrik PVC 5/8'' M 7,403.50 100.00 7,503.50 7,500.00
77 Kabel NYM 3 x 2,5mm M 17,085.00 100.00 17,185.00 17,200.00
78 Tee Doz Bh 11,390.00 100.00 11,490.00 11,500.00
79 Isolasi Listrik Bh 5,125.50 - 5,125.50 5,100.00
80 Penyambungan Daya 1300 Watt Unit 1,993,250.00 - 1,993,250.00 1,993,300.00
81 Kalsi Board 6 mm Lmbr 96,815.00 1.00 96,816.00 96,800.00
82 Rangka Hollow Galvalum 40 x 40 mm M 39,865.00 2.00 39,867.00 39,900.00
83 List Plafond Gypsum M 17,085.00 3.00 17,088.00 17,100.00