ENGINEER'S ESTIMATE
Satuan Kerja : DINAS PERINDUSTRIAN DAN PERDAGANGAN
Pekerjaan : REVITALISASI KIOS PASAR BINAYA MASOHI
Lokasi : MASOHI - KAB. MALUKU TENGAH
Tahun Anggaran : 2016
Terbilang : #N/A
HARGA
JUMLAH
NO URAIAN PEKERJAAN SAT. VOLUME
(Rp.)
(Rp.)
IV PEKERJAAN ELEKTRIKAL
A PEKERJAAN INSTALASI LISTRIK
1 Penyambungan Daya 900 Watt bh 4.00 #N/A #N/A
2 Pasang Lampu SL 14 Watt + Veeting bh - #N/A #N/A
3 Pasang Stop Kontak bh 2.00 72,248.75 144,497.50
4 Pasang Saklar Tunggal bh Err:509 78,803.75 Err:509
5 Pasang Saklar Ganda bh 2.00 91,913.75 183,827.50
6 Instalasi Lampu Penerangan ttk 4.00 375,532.50 1,502,130.00
7 Instalasi Stop Kontak ttk 2.00 375,532.50 751,065.00
sub total #N/A
A PEKERJAAN CCTV
1 Penyambungan Daya 900 Watt bh - #N/A #N/A
2 Pasang Lampu SL 14 Watt + Veeting bh 2.00 #N/A #N/A
3 Pasang Stop Kontak bh Err:509 72,248.75 Err:509
4 Pasang Saklar Tunggal bh - 78,803.75 -
5 Pasang Saklar Ganda bh 4.00 91,913.75 367,655.00
6 Instalasi Lampu Penerangan ttk Err:509 375,532.50 Err:509
7 Instalasi Stop Kontak ttk Err:509 375,532.50 Err:509
sub total #N/A
B PEKERJAAN PENANGKAL PETIR
1 Instalasi Penangkal Petir Unit - 5,000,000.00 -
sub total -
JUMLAH #N/A
REKAPITULASI
ENGINEER'S ESTIMATE
Satuan Kerja : DINAS PERINDUSTRIAN DAN PERDAGANGAN
Pekerjaan : PEMBANGUNAN FASUM KIOS PASAR BINAYA MASOHI
Lokasi : MASOHI - KAB. MALUKU TENGAH
Tahun Anggaran : 2016
Terbilang : Enam Ratus Dua Puluh Satu Juta Sembilan Ratus Sembilan Puluh Satu Ribu Rupiah
HARGA
JUMLAH
NO URAIAN PEKERJAAN SAT. VOLUME
(Rp.)
(Rp.)
I PEKERJAAN STRUKTUR
A PEKERJAAN TANAH
1 Galian Tanah Pondasi Batu Kali M³ 12.18 92,000.00 1,120,744.00
2 Urug Kembali Tanah Galian M³ 4.06 69,000.00 280,186.00
3 Urug Pasir Bawah Pondasi M³ 3.17 #N/A #N/A
sub total #N/A
B PEKERJAAN PASANGAN
1 Pondasi Batu Kosong (Aanstamping) M³ 4.75 682,345.83 3,240,460.35
2 Pondasi Batu Kali 1 PC : 5 Psr M³ 16.32 1,160,754.11 18,940,605.19
sub total 22,181,065.54
C PEKERJAAN BETON
1 Rabat Beton Mutu f'c =7,4 Mpa (K-100) M³ 2.68 #N/A #N/A
2 Sloof S1 15 x 20 cm
Beton mutu f'c = 19,3 Mpa (K-225) M³ 1.42 1,500,320.48 2,128,954.77
Pembesian dengan Besi Polos atau Ulir Kg 213.98 28,944.93 6,193,528.92
Bekisting Sloof M² 18.92 224,547.28 4,248,434.44
3 Kolom K1 20 x 20 cm
Beton mutu f'c = 19,3 Mpa (K-225) M³ 1.20 1,500,320.48 1,800,384.58
Pembesian dengan Besi Polos atau Ulir Kg 205.67 28,944.93 5,953,006.24
Bekisting Kolom M² 24.00 417,238.40 10,013,721.60
4 Balok B1 15 x 20 cm
Beton mutu f'c = 19,3 Mpa (K-225) M³ 1.09 1,500,320.48 1,638,349.97
Pembesian dengan Besi Polos atau Ulir Kg 243.85 28,944.93 7,058,252.12
Bekisting Balok M² 14.56 426,669.32 6,212,305.30
5 Balok Konsol B2 15 x 20 cm
Beton mutu f'c = 19,3 Mpa (K-225) M³ 0.28 1,500,320.48 419,039.51
Pembesian dengan Besi Polos atau Ulir Kg 63.53 28,944.93 1,838,835.71
Bekisting Balok M² 5.12 426,669.32 2,184,760.25
6 Balok Lisplank B3 8 x 35 cm
Beton mutu f'c = 19,3 Mpa (K-225) M³ 1.70 1,500,320.48 2,554,145.59
Pembesian dengan Besi Polos atau Ulir Kg 202.46 28,944.93 5,860,305.30
Bekisting Balok M² 47.42 426,669.32 20,234,365.83
7 Balok Latai Beton Bertulang (10 x 15) cm M¹ 25.20 176,625.40 4,450,959.95
8 Kolom Praktis Beton Bertulang (11 x 11) cm M¹ 33.00 139,974.32 4,619,152.56
9 Ring Balok Beton Bertulang (10 x 15) cm M¹ 12.40 185,901.30 2,305,176.06
sub total #N/A
D PEKERJAAN ATAP
1 Rangka Atap Baja Ringan (Galvalum) M² 73.22 #N/A #N/A
sub total #N/A
Jumlah Pekerjaan Struktur #N/A
II PEKERJAAN ARSITEKTUR
A PEKERJAAN PASANGAN DAN PLESTERAN
1 Dinding Batako 1 PC : 5 Psr M² Err:509 162,006.02 Err:509
2 Plesteran 1 PC : 5 Psr, tebal 15 mm M² Err:509 84,214.79 Err:509
3 Acian M² Err:509 #N/A Err:509
HARGA
JUMLAH
NO URAIAN PEKERJAAN SAT. VOLUME
(Rp.)
(Rp.)
IV PEKERJAAN MEKANIKAL
A PEKERJAAN INSTALASI AIR HUJAN
1 Pasang Roof Drain Bh 3.00 #N/A #N/A
2 Pasang Pipa Air Hujan Pipa PVC AW 3" M¹ 12.00 #N/A #N/A
3 Pasang Pipa Induk Air Hujan Pipa PVC AW 5" M¹ 18.00 #N/A #N/A
Jumlah Pekerjaan Mekanikal #N/A
JUMLAH #N/A
PEMERINTAH KAB. MALUKU TENGAH
DINAS PERIKANAN
Jl. Buru Telp. / Fax. (0914) 21247 - Masohi 97511
ENGINEER'S ESTIMATE
(EE)
PEKERJAAN :
PEMBANGUNAN BENGKEL NELAYAN
DAN GALANGAN KAPAL
LOKASI :
WAITOMU, DESA HILA -
KABUPATEN MALUKU TENGAH
NILAI :
Rp. 200,000,000.00
SUMBER DANA :
APBD
Terbilang : Enam Ratus Dua Puluh Satu Juta Sembilan Ratus Sembilan Puluh Satu Ribu Rupiah
KEPALA DINAS
PERDAGANGAN DAN PERINDUSTRIAN
KAB. MALUKU TENGAH
NIP. …………………………………….
DAFTAR MATA PEMBAYARAN UMUM & UTAMA
HARGA
JUMLAH
NO URAIAN PEKERJAAN SAT. VOLUME
(Rp.)
(Rp.)
II PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan dan Perataan Ls 1.00 10,000,000.00 10,000,000.00
2 Pengukuran dan Pemasangan Bouwplank Ls 1.00 9,300,000.00 9,300,000.00
3 Pembuatan Papan Nama Proyek Ls 1.00 505,000.00 505,000.00
4 Dokumentasi & Pelaporan Ls 1.00 5,000,000.00 5,000,000.00
5 Pembersihan Akhir Ls 1.00 5,000,000.00 5,000,000.00
JUMLAH PEKERJAAN PERSIAPAN 29,805,000.00
JUMLAH TOTAL PEKERJAAN LUMPSUM 51,100,000.00
HARGA
JUMLAH
NO URAIAN PEKERJAAN SAT. VOLUME
(Rp.)
(Rp.)
Terbilang : Enam Ratus Dua Puluh Satu Juta Sembilan Ratus Sembilan Puluh Satu Ribu Rupiah
KEPALA DINAS
PERDAGANGAN DAN PERINDUSTRIAN
KAB. MALUKU TENGAH
NIP. …………………………………….
REKAPITULASI
ENGINEER'S ESTIMATE
Satuan Kerja :
Pekerjaan :
Lokasi :
Tahun Anggaran :
Terbilang : Enam Ratus Dua Puluh Satu Juta Sembilan Ratus Sembilan Puluh Satu Ribu Rupiah
Konsultan Perencana,
CV. BERDIKARI CONSULTANT
HARGA
JUMLAH
NO URAIAN PEKERJAAN SAT. VOLUME PPN 10%
(Rp.)
(Rp.)
I PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan dan Perataan Ls 1.00 10,000,000.00 1,000,000.00 11,000,000.00
2 Pengukuran dan Pemasangan Bouwplank Ls 1.00 9,300,000.00 930,000.00 10,230,000.00
3 Pembuatan Papan Nama Proyek Ls 1.00 505,000.00 50,500.00 555,500.00
4 Dokumentasi & Pelaporan Ls 1.00 5,000,000.00 500,000.00 5,500,000.00
5 Pembersihan Akhir Ls 1.00 5,000,000.00 500,000.00 5,500,000.00
JUMLAH 32,785,500.00
ENGINEER'S ESTIMATE
(EE)
Satuan Kerja : Dinas Perdagangan dan Perindustrian Kab. Maluku Tengah
Pekerjaan : Pembangunan Rumah Produksi Pandai Besi
Lokasi : Kabupaten Maluku Tengah
TA : 2020
HARGA
JUMLAH
NO URAIAN PEKERJAAN SAT. VOLUME PPN 10%
(Rp.)
(Rp.)
HARGA
JUMLAH
NO URAIAN PEKERJAAN SAT. VOLUME PPN 10%
(Rp.)
(Rp.)
Kegiatan #REF!
Pekerjaan #REF!
Lokasi #REF!
Thn. Anggaran #REF!
timbunan 4.80
B PEKERJAAN PASANGAN
1 Batu Kosong 1.80
C PEKERJAAN BETON
PONDASI TELAPAK
BETON 0.61
PEMBESIAN 51.11
BEKISTING 12.60
1 Sloof Beton
beton k-100 0.60
Pembesian 77.69
Bekisting 11.00
4 Kolom K1 15 x 15 cm
Beton mutu f'c = 16,9 Mpa (K-200) 0.27
Kolom As - A
TEMPAT BAKAR
pembesian 28.02
Bekisting 3.00
TEMPAT ARANG
Pembesian 77.69
Bekisting 11.00
6 Kolom Praktis Beton Bertulang (11 x 11) cm 6.00
Kolom Praktis
D PEKERJAAN ATAP
1 Atap Zincalume 0,35 mm 32.20
segitiga
trapesium
6 Tiang Kayu
0.36
DIMENSI
JUMLAH
SAT. pjg lbr tg VOLUME
jmlh VOLUME
(m) (m) (m)
M³ 9.60
20.00 0.60 0.80 9.60
M³ 3.20
3.20
M³ 0.39
14.00 0.55 0.05 0.39
M3 0.39
14.00 0.55 0.05 0.39
M3 0.60
20.00 0.15 0.20 0.60
M³ 0.27
0.15 0.15 3.00 4 0.27
Kg 46.62
10 4.00 3.00 0.62 4 29.58
8 0.54 20.000 0.39 4 17.04
M³ 0.60
20.00 0.15 0.20 0.60
M² 32.20
5.32 5.32
26.88 26.88
M¹ 31.68
15.84 2 31.68
M¹ 26.40
26.40 1 26.40
M³ 0.30
20.98 0.12 0.06 2 0.30
M³ 0.35
70.40 0.05 0.10 0.35
#REF! #REF!
#REF!
7.6
tul utama 10
tul sengk. 8
#REF! #REF!
ENGINEER'S ESTIMATE
(EE)
Satuan Kerja : Dinas Perdagangan dan Perindustrian Kab. Maluku Tengah
Pekerjaan : Pembangunan Rumah Produksi Pandai Besi
Lokasi : Kabupaten Maluku Tengah
TA : 2020
HARGA
JUMLAH
NO URAIAN PEKERJAAN SAT. VOLUME PPN 10%
(Rp.)
(Rp.)
HARGA
JUMLAH
NO URAIAN PEKERJAAN SAT. VOLUME PPN 10%
(Rp.)
(Rp.)
HARGA
JUMLAH
NO URAIAN PEKERJAAN SAT. VOLUME
(Rp.)
(Rp.)
V PEKERJAAN MEKANIKAL
A PEKERJAAN INSTALASI AIR HUJAN
1 Pasang Roof Drain Bh 50.00 #N/A -
2 Pasang Pipa Air Hujan Pipa PVC AW 3" M¹ 225.00 #N/A -
3 Pasang Pipa Induk Air Hujan Pipa PVC AW 5" M¹ 595.00 #N/A -
sub total -
D SALURAN KELILING
1 Galian Tanah Saluran Air M³ 77.96 #N/A -
2 Urug Kembali Tanah Galian M³ 11.14 69,000.00 -
3 Urug Pasir Bawah Saluran M³ 14.85 #N/A -
4 Rabat Beton Bawah Saluran, t = 8 cm Mutu f'c =7,4 Mpa (K-100) M³ 7.43 #N/A -
5 Dinding Batako 1 PC : 5 Psr M² 178.00 162,006.02 -
6 Plesteran 1 PC : 5 Psr, tebal 15 mm M² 148.50 84,214.79 -
7 Plat Penutup Saluran
Beton mutu f'c = 19,3 Mpa (K-225) M³ 1.66 1,500,320.48 -
Pembesian dengan Besi Polos atau Ulir Kg 152.63 28,944.93 -
Bekisting Plat Penutup M² 7.34 #N/A -
sub total -
JUMLAH -
ANALISA HARGA SATUAN PEKERJAAN
PEKERJAAN TANAH
PEKERJAAN DINDING
PEKERJAAN PLESTERAN
PEKERJAAN BETON
13 1 m3 Rabat Beton Keliling mutu f'c =7,4 Mpa (K-100) AHSP CK A.4.1.1.1 1,280,243.09
1.6500 OH Pekerja 100,000.00 165,000.00
0.2750 OH Tukang Batu 150,000.00 41,250.00
TENAGA
0.0280 OH Kepala Tukang 175,000.00 4,900.00
0.0830 OH Mandor 200,000.00 16,600.00
247.0000 Kg Semen Portland (PC) 1,672.00 412,984.00
869.0000 Kg Pasir Beton 176.86 153,688.86
BAHAN
999.0000 Kg Batu Pecah 2 - 3 cm 297.63 297,332.00
215.0000 Liter Air 100.00 21,500.00
JUMLAH HARGA 1,113,254.86
OVERHEAD & PROFIT 15 % 166,988.23
HARGA SATUAN PEKERJAAN 1,280,243.09
14 1 m3 Rabat Beton Lantai mutu f'c =7,4 Mpa (K-100) AHSP CK A.4.1.1.4 1,177,207.92
1.2000 OH Pekerja 100,000.00 120,000.00
0.2000 OH Pekerja 100,000.00 20,000.00
TENAGA
0.0200 OH Kepala Tukang 175,000.00 3,500.00
0.0600 OH Mandor 200,000.00 12,000.00
230.0000 Kg Semen Portland (PC) 1,672.00 384,560.00
893.0000 Kg Pasir Beton 176.86 157,933.43
BAHAN
1,027.0000 Kg Batu Pecah 2 - 3 cm 297.63 305,665.63
200.0000 Liter Air 100.00 20,000.00
JUMLAH HARGA 1,023,659.06
OVERHEAD & PROFIT 15 % 153,548.86
HARGA SATUAN PEKERJAAN 1,177,207.92
PEKERJAAN PENGECATAN
PEKERJAAN LISTRIK
HARGA UPAH
1 Mandor OH Rp 200,000.00
2 Kepala Tukang OH Rp 175,000.00
3 Tukang Batu OH Rp 150,000.00
4 Tukang Kayu OH Rp 150,000.00
5 Tukang Besi OH Rp 150,000.00
6 Tukang Cat OH Rp 150,000.00
7 Tukang Listrik OH Rp 150,000.00
8 Tukang Las OH Rp 150,000.00
9 Tukang Khusus Aluminium OH Rp 150,000.00
10 Pekerja OH Rp 100,000.00
HARGA BAHAN
33 Paku 5 - 10 cm Kg Rp 14,800.00
34 Paku 5 - 12 cm Kg Rp 14,800.00
35 Paku 7 - 10 cm Kg Rp 14,800.00
36 Paku 10 cm Kg Rp 14,800.00
37 Paku 12 cm Kg Rp 16,500.00
38 Paku Tripleks Kg Rp 14,300.00
39 Paku Sekrup Kg Rp 36,400.00
40 Sekrup Fischer Bh Rp 1,000.00
41 Plywood 4 mm Lbr Rp 85,700.00
42 Plywood 9 mm Lbr Rp 166,700.00
43 Tripleks 3 mm Lbr Rp 86,400.00
44 Plywood tebal 4 mm uk. 90 x 220 cm Lbr Rp 92,100.00
45 GRC 4 mm Lbr Rp 83,600.00
46 List Profil Gypsum M Rp 20,400.00
47 List Langit-Langit Kayu Profil, Kayu Kelas II M Rp 13,000.00
48 Tepung Gypsum Kg Rp 67,100.00
49 Lisplank GRC 2 x 20 cm M Rp 14,700.00
50 Lem Kayu Kg Rp 68,800.00
51 Zincalume 0,35 mm Lbr Rp 97,800.00
52 Nok Zincalume 0,35 mm M Rp 58,000.00
53 Cat Meni Besi Kg Rp 19,800.00
54 Cat Meni kayu Kg Rp 19,800.00
55 Cat Dasar Kayu Kg Rp 44,600.00
56 Cat Penutup Kayu Kg Rp 44,600.00
57 Pengencer Cat / Thinner Kg Rp 29,700.00
58 Amplas Lbr Rp 4,900.00
59 Cat Dasar Roof Paint Kg Rp 39,600.00
60 Cat Penutup Roof Paint Kg Rp 39,600.00
61 Cat Dasar Tembok Kg Rp 49,500.00
62 Cat Penutup Tembok Kg Rp 49,500.00
63 Plamur Kg Rp 24,800.00
64 Roll Kg Rp 29,700.00
65 Kuas Kg Rp 14,900.00
66 Alat Bantu Pengecatan Kg Rp 1,100.00
67 Minyak Bekisting Kg Rp 18,100.00
68 Engsel Pintu Psg Rp 34,700.00
69 Kunci Tanam 2 Slaag bh Rp 222,900.00
70 Veeting Tempel Bh Rp 20,400.00
71 Lampu SL 18 Watt Bh Rp 51,800.00
72 Saklar Tunggal Bh Rp 40,400.00
73 Saklar Ganda Bh Rp 51,800.00
74 Stop Kontak Bh Rp 34,700.00
75 Paku Klem Listrik Kg Rp 46,100.00
76 Pipa Listrik PVC 5/8'' M Rp 7,500.00
77 Kabel NYM 3 x 2,5mm M Rp 17,200.00
78 Tee Doz Bh Rp 11,500.00
79 Isolasi Listrik Bh Rp 5,100.00
80 Penyambungan Daya 1300 Watt Unit Rp 1,993,300.00
81 Kalsi Board 6 mm Lmbr Rp 96,800.00
82 Rangka Hollow Galvalum 40 x 40 mm M Rp 39,900.00
83 List Plafond Gypsum M Rp 17,100.00
ALUR HARGA BAHAN & UPAH KERJA
UPAH KERJA
1 Mandor OH 200,000.00 - 200,000.00 200,000.00
2 Kepala Tukang OH 175,000.00 - 175,000.00 175,000.00
3 Tukang Batu OH 150,000.00 - 150,000.00 150,000.00
4 Tukang Kayu OH 150,000.00 - 150,000.00 150,000.00
5 Tukang Besi OH 150,000.00 - 150,000.00 150,000.00
6 Tukang Cat OH 150,000.00 - 150,000.00 150,000.00
7 Tukang Listrik OH 150,000.00 - 150,000.00 150,000.00
8 Tukang Las OH 150,000.00 - 150,000.00 150,000.00
9 Tukang Khusus Aluminium OH 150,000.00 - 150,000.00 150,000.00
10 Pekerja OH 100,000.00 - 100,000.00 100,000.00
HARGA BAHAN
1 Batu Kali M3 297,165.10 297,165.10 297,200.00
2 Batu Pecah 2 - 3 cm M3 327,691.44 25,000.00 352,691.44 49,153.72 401,800.00
3 Pasir Pasang M3 247,643.66 247,643.66 247,600.00
4 Pasir Beton M3 247,618.60 247,618.60 247,600.00
5 Pasir Urug M3 198,072.10 198,072.10 198,100.00
6 Tanah Urug M3 148,525.60 148,525.60 148,500.00
7 Air Ltr 113.90 - 113.90 100.00
8 Semen Portland @ 50 Kg (PC) Sak 82,577.50 1,000.00 83,577.50 83,600.00
9 Semen Portland (PC) Kg 1,765.45 20.00 1,785.45 1,672.00
10 Semen Khusus Bata Ringan Kg 5,339.06 1,000.00 6,339.06 6,300.00
11 Semen Warna Kg 2,232.44 - 2,232.44 2,200.00
No URAIAN SATUAN HARGA BELI ONGKOS ONGKOS HARGA DI GALIAN C JUMLAH
DI QUARY ANGKUT NAIK/TURUN LOKASI 20% x BJ x (4) HARGA
PROYEK
(1) (2) (3) (4) (5) (6) (7 = 4+5+6) (8) (9 = 7+8)
12 Besi Beton Polos / Ulir Kg 20,786.75 1,000.00 21,786.75 21,800.00
13 Besi Beton Polos Kg 20,786.75 1,000.00 21,786.75 21,800.00
14 Besi Angkur Ø 8 mm Kg 14,237.50 1,000.00 15,237.50 15,200.00
15 Kawat Ikat Beton (Bendrat) Kg 20,786.75 1,000.00 21,786.75 21,800.00
16 Besi Beton Ø 10 mm Kg 22,780.00 1,000.00 23,780.00 23,800.00
17 Besi Beton Ø 12 mm Kg 25,058.00 1,000.00 26,058.00 26,100.00
18 Besi Strip tebal 5 mm Kg 14,807.00 1,000.00 15,807.00 15,800.00
19 Bata Merah Bh 1,708.50 100.00 1,808.50 1,800.00
20 Batako Bh 2,391.90 100.00 2,491.90 2,500.00
21 Balok Kayu Kelas I M3 7,688,250.00 7,688,250.00 7,688,300.00
22 Papan Kayu Kelas I M3 7,802,150.00 7,802,150.00 7,802,200.00
23 Balok Kayu Kelas II M3 2,733,600.00 2,733,600.00 2,733,600.00
24 Kayu Kasau 5 x 7 cm M3 2,357,502.20 2,357,502.20 2,357,500.00
25 Papan Kayu Kelas II M3 2,847,500.00 2,847,500.00 2,847,500.00
26 Balok Kayu 5 x 7 cm Kelas II M3 2,847,500.00 2,847,500.00 2,847,500.00
27 Kayu Kelas III M3 1,936,300.00 25,000.00 1,961,300.00 1,961,300.00
28 Balok Kayu 5 x 7 cm Kelas III M3 1,936,300.00 25,000.00 1,961,300.00 1,961,300.00
29 Papan Kayu Kelas III M3 1,936,300.00 25,000.00 1,961,300.00 1,961,300.00
30 Dolken Kayu Ø 8 - 10 cm, p = 4 m Btg 22,780.00 1,000.00 23,780.00 23,800.00
31 Paku 1 - 2,5 cm Kg 13,838.85 500.00 14,338.85 14,300.00
32 Paku 5 - 7 cm Kg 14,807.00 14,807.00 14,800.00
33 Paku 5 - 10 cm Kg 14,807.00 14,807.00 14,800.00
34 Paku 5 - 12 cm Kg 14,807.00 14,807.00 14,800.00
35 Paku 7 - 10 cm Kg 14,807.00 14,807.00 14,800.00
36 Paku 10 cm Kg 14,807.00 14,807.00 14,800.00
37 Paku 12 cm Kg 16,515.50 16,515.50 16,500.00
38 Paku Tripleks Kg 13,838.85 500.00 14,338.85 14,300.00
39 Paku Sekrup Kg 35,935.45 500.00 36,435.45 36,400.00
No URAIAN SATUAN HARGA BELI ONGKOS ONGKOS HARGA DI GALIAN C JUMLAH
DI QUARY ANGKUT NAIK/TURUN LOKASI 20% x BJ x (4) HARGA
PROYEK
(1) (2) (3) (4) (5) (6) (7 = 4+5+6) (8) (9 = 7+8)
40 Sekrup Fischer Bh 911.20 50.00 961.20 1,000.00
41 Plywood 4 mm Lbr 85,425.00 250.00 85,675.00 85,700.00
42 Plywood 9 mm Lbr 165,155.00 1,500.00 166,655.00 166,700.00
43 Tripleks 3 mm Lbr 85,425.00 1,000.00 86,425.00 86,400.00
44 Plywood tebal 4 mm uk. 90 x 220 cm Lbr 91,120.00 1,000.00 92,120.00 92,100.00
45 GRC 4 mm Lbr 82,577.50 1,000.00 83,577.50 83,600.00
46 List Profil Gypsum M 19,932.50 500.00 20,432.50 20,400.00
47 List Langit-Langit Kayu Profil, Kayu Kelas II M 12,529.00 500.00 13,029.00 13,000.00
48 Tepung Gypsum Kg 66,631.50 500.00 67,131.50 67,100.00
49 Lisplank GRC 2 x 20 cm M 14,237.50 500.00 14,737.50 14,700.00
50 Lem Kayu Kg 68,340.00 500.00 68,840.00 68,800.00
51 Zincalume 0,35 mm Lbr 96,815.00 1,000.00 97,815.00 97,800.00
52 Nok Zincalume 0,35 mm M 56,950.00 1,000.00 57,950.00 58,000.00
53 Cat Meni Besi Kg 19,306.05 500.00 19,806.05 19,800.00
54 Cat Meni kayu Kg 19,306.05 500.00 19,806.05 19,800.00
55 Cat Dasar Kayu Kg 44,079.30 500.00 44,579.30 44,600.00
56 Cat Penutup Kayu Kg 44,079.30 500.00 44,579.30 44,600.00
57 Pengencer Cat / Thinner Kg 29,215.35 500.00 29,715.35 29,700.00
58 Amplas Lbr 4,897.70 50.00 4,947.70 4,900.00
59 Cat Dasar Roof Paint Kg 39,124.65 500.00 39,624.65 39,600.00
60 Cat Penutup Roof Paint Kg 39,124.65 500.00 39,624.65 39,600.00
61 Cat Dasar Tembok Kg 48,977.00 500.00 49,477.00 49,500.00
62 Cat Penutup Tembok Kg 48,977.00 500.00 49,477.00 49,500.00
63 Plamur Kg 24,260.70 500.00 24,760.70 24,800.00
64 Roll Kg 29,614.00 100.00 29,714.00 29,700.00
65 Kuas Kg 14,750.05 100.00 14,850.05 14,900.00
66 Alat Bantu Pengecatan Kg 1,139.00 - 1,139.00 1,100.00
67 Minyak Bekisting Kg 17,085.00 1,000.00 18,085.00 18,100.00
No URAIAN SATUAN HARGA BELI ONGKOS ONGKOS HARGA DI GALIAN C JUMLAH
DI QUARY ANGKUT NAIK/TURUN LOKASI 20% x BJ x (4) HARGA
PROYEK
(1) (2) (3) (4) (5) (6) (7 = 4+5+6) (8) (9 = 7+8)
68 Engsel Pintu Psg 33,714.40 1,000.00 34,714.40 34,700.00
69 Kunci Tanam 2 Slaag bh 221,877.20 1,000.00 222,877.20 222,900.00
70 Veeting Tempel Bh 19,932.50 500.00 20,432.50 20,400.00
71 Lampu SL 18 Watt Bh 51,255.00 500.00 51,755.00 51,800.00
72 Saklar Tunggal Bh 39,865.00 500.00 40,365.00 40,400.00
73 Saklar Ganda Bh 51,255.00 500.00 51,755.00 51,800.00
74 Stop Kontak Bh 34,170.00 500.00 34,670.00 34,700.00
75 Paku Klem Listrik Kg 45,560.00 500.00 46,060.00 46,100.00
76 Pipa Listrik PVC 5/8'' M 7,403.50 100.00 7,503.50 7,500.00
77 Kabel NYM 3 x 2,5mm M 17,085.00 100.00 17,185.00 17,200.00
78 Tee Doz Bh 11,390.00 100.00 11,490.00 11,500.00
79 Isolasi Listrik Bh 5,125.50 - 5,125.50 5,100.00
80 Penyambungan Daya 1300 Watt Unit 1,993,250.00 - 1,993,250.00 1,993,300.00
81 Kalsi Board 6 mm Lmbr 96,815.00 1.00 96,816.00 96,800.00
82 Rangka Hollow Galvalum 40 x 40 mm M 39,865.00 2.00 39,867.00 39,900.00
83 List Plafond Gypsum M 17,085.00 3.00 17,088.00 17,100.00