ITEM PEMBAYARAN NO. : Analisa Praktis - 04 ANALISA TERAPAN
KODE/ JENIS PEKERJAAN : Pasang Plafond Kalsiboard + Rangka Hollow Galvalum
SATUAN PEMBAYARAN : M2
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.250 97,000.00 24,250.00
Tukang Allumunium L.02 Org/Hari 0.300 115,000.00 34,500.00
Kepala Tukang L.03 Org/Hari 0.025 125,000.00 3,125.00
Mandor L.04 Org/Hari 0.013 - -
JUMLAH TENAGA KERJA 61,875.00
B. BAHAN :
Kalsiboard 4 mm - Lbr 0.364 67,000.00 24,388.00
Rangka Hollow 2x4 cm, T = 0,35 mm - Btg 1.025 25,000.00 25,625.00
Stifenner/ Braket - Bh 3.000 3,500.00 10,500.00
Skrup Fixer - Kg 0.150 31,000.00 4,650.00
Penggantung dan Ramset - Bh 4.000 3,000.00 12,000.00
JUMLAH HARGA BAHAN 77,163.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 139,038.00
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E) 139,038.00
ITEM PEMBAYARAN NO. : Analisa Praktis - 05 AHSP - A.4.4.3
KODE/ JENIS PEKERJAAN : Pemasangan Dinding Keramik Ukuran 20 cm x 40 cm
SATUAN PEMBAYARAN : M2
URAIAN HARGA SATUAN JUMLAH HARGA
No. KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.240 97,000.00 23,280.00
Tukang Batu L.02 Org/Hari 0.120 115,000.00 13,800.00
Kepala Tukang L.03 Org/Hari 0.012 125,000.00 1,500.00
Mandor L.04 Org/Hari 0.012 - -
JUMLAH TENAGA KERJA 38,580.00
B. BAHAN :
Keramik Ukuran 20 cm x 40 cm - Buah 12.500 5,600.00 70,000.00
Semen Portland - Kg 9.300 1,340.00 12,462.00
Semen Warna - Kg 1.940 15,000.00 29,100.00
Pasir Pasang - M3 0.018 190,000.00 3,420.00
JUMLAH HARGA BAHAN 114,982.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 153,562.00
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E) 153,562.00
ITEM PEMBAYARAN NO. : Analisa Praktis - 06 AHSP - A.4.4.3
KODE/ JENIS PEKERJAAN : Pemasangan Dinding Keramik Ukuran 20 cm x 40 cm (Bermotif)
SATUAN PEMBAYARAN : M2
URAIAN HARGA SATUAN JUMLAH HARGA
No. KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.240 97,000.00 23,280.00
Tukang Batu L.02 Org/Hari 0.120 115,000.00 13,800.00
Kepala Tukang L.03 Org/Hari 0.012 125,000.00 1,500.00
Mandor L.04 Org/Hari 0.012 - -
JUMLAH TENAGA KERJA 38,580.00
B. BAHAN :
Keramik Bermotif Ukuran 20 cm x 40 cm - Buah 12.500 6,800.00 85,000.00
Semen Portland - Kg 9.300 1,340.00 12,462.00
Semen Warna - Kg 1.940 15,000.00 29,100.00
Pasir Pasang - M3 0.018 190,000.00 3,420.00
JUMLAH HARGA BAHAN 129,982.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 168,562.00
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E) 168,562.00
Halaman-3
ITEM PEMBAYARAN NO. : Analisa Praktis - 07 ANALISA TERAPAN
KODE/ JENIS PEKERJAAN : Pengecatan Plafond Gypsum (1 Lapis Plamur, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
SATUAN PEMBAYARAN : M2
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.020 97,000.00 1,940.00
Tukang Kayu L.02 Org/Hari 0.063 115,000.00 7,245.00
Kepala Tukang L.03 Org/Hari 0.0063 125,000.00 787.50
Mandor L.04 Org/Hari 0.0025 - -
JUMLAH TENAGA KERJA 9,972.50
B. BAHAN :
Cat Plafond ( Dasar ) - Kg 0.100 50,000.00 5,000.00
Cat Plafond ( Penutup 2 x ) - Kg 0.260 50,000.00 13,000.00
JUMLAH HARGA BAHAN 18,000.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 27,972.50
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E) 27,972.50
ITEM PEMBAYARAN NO. : Analisa Praktis - 08 ANALISA TERAPAN
KODE/ JENIS PEKERJAAN : Pengecatan Pelapis Kedap Air (Water Proofing)
SATUAN PEMBAYARAN : M2
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.020 97,000.00 1,940.00
Tukang Kayu L.02 Org/Hari 0.063 115,000.00 7,245.00
Kepala Tukang L.03 Org/Hari 0.0063 125,000.00 787.50
Mandor L.04 Org/Hari 0.0025 - -
JUMLAH TENAGA KERJA 9,972.50
B. BAHAN :
Polimer Mortar - Kg 2.000 25,000.00 50,000.00
JUMLAH HARGA BAHAN 50,000.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 59,972.50
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E) 59,972.50
ITEM PEMBAYARAN NO. : Analisa Praktis - 09 ANALISA TERAPAN
KODE/ JENIS PEKERJAAN : Pemasangan Gantungan Teralis Type-1, Rangka Besi Hollow 40.40.2 mm (Lihat Gbr. Rencana)
SATUAN PEMBAYARAN : Unit
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 1.375 97,000.00 133,375.00
Tukang Besi L.02 Org/Hari 1.375 115,000.00 158,125.00
Kepala Tukang L.03 Org/Hari 0.138 125,000.00 17,187.50
Mandor L.04 Org/Hari 0.072 - -
JUMLAH TENAGA KERJA 308,687.50
B. BAHAN :
Rangka Metal Hollow 40.40.2 mm - M1 11.950 26,666.67 318,666.67
Peralatan dan Accesories (Perkuatan, Las, dll) - Ls 25 % x 79,666.67 79,666.67
Material 318,666.67
Pengecatan Besi Hollow AHSP - A.4.7.1.5.1 M2 1.540 33,540.00 51,651.60
JUMLAH HARGA BAHAN 449,984.93
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 758,672.43
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E) 758,672.43
Halaman-4
ITEM PEMBAYARAN NO. : Analisa Praktis - 10 ANALISA TERAPAN
KODE/ JENIS PEKERJAAN : Pemasangan Gantungan Teralis Type-2, Rangka Besi Hollow 40.40.2 mm (Lihat Gbr. Rencana)
SATUAN PEMBAYARAN : Unit
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.500 97,000.00 48,500.00
Tukang Besi L.02 Org/Hari 0.500 115,000.00 57,500.00
Kepala Tukang L.03 Org/Hari 0.250 125,000.00 31,250.00
Mandor L.04 Org/Hari 0.025 - -
JUMLAH TENAGA KERJA 137,250.00
B. BAHAN :
Rangka Metal Hollow 40.40.2 mm - M1 6.350 26,666.67 169,333.33
Peralatan dan Accesories (Perkuatan, Las, dll) - Ls 25 % x 42,333.33 42,333.33
Material 169,333.33
Pengecatan Besi Hollow AHSP - A.4.7.1.5.1 M2 0.867 33,540.00 29,079.18
JUMLAH HARGA BAHAN 240,745.85
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 377,995.85
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E) 377,995.85
Halaman-5
ITEM PEMBAYARAN NO. : Analisa Praktis - 13 ANALISA TERAPAN
KODE/ JENIS PEKERJAAN : Pemasangan Stop Kontak 1P, 13 A
SATUAN PEMBAYARAN : Buah
Halaman-6
ITEM PEMBAYARAN NO. : Analisa Praktis - 16 ANALISA TERAPAN
KODE/ JENIS PEKERJAAN : Pemasangan Saklar Tunggal, 10 A, 250 VAC
SATUAN PEMBAYARAN : Buah
Halaman-7
ITEM PEMBAYARAN NO. : Analisa Praktis - 19 ANALISA TERAPAN
KODE/ JENIS PEKERJAAN : Pemasangan Lampu RMI TL 2 x 18 Watt, Stainlees Grill
SATUAN PEMBAYARAN : Buah
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Upah Pasang Ls 1.000 8,500.00 8,500.00
JUMLAH TENAGA KERJA 8,500.00
B. BAHAN :
Lampu RMI TL 2 x 18 Watt, Stainlees Grill - Bh 1.000 300,000.00 300,000.00
JUMLAH HARGA BAHAN 300,000.00
C. PERALATAN :
Material Bantu/ Alat Bantu Ls 1.000 5,000.00 5,000.00
JUMLAH HARGA ALAT 5,000.00
D. Jumlah (A+B+C) 313,500.00
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E) 313,500.00
ITEM PEMBAYARAN NO. : Analisa Praktis - 20 ANALISA TERAPAN
KODE/ JENIS PEKERJAAN : Pemasangan Lampu RM TL 2 x 18 Watt Komplit, Glass ALML
SATUAN PEMBAYARAN : Buah
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Upah Pasang Ls 1.000 8,500.00 8,500.00
JUMLAH TENAGA KERJA 8,500.00
B. BAHAN :
Lampu RM TL 2 x 18 Watt Komplit, Glass ALML - Bh 1.000 325,000.00 325,000.00
JUMLAH HARGA BAHAN 325,000.00
C. PERALATAN :
Material Bantu/ Alat Bantu Ls 1.000 5,000.00 5,000.00
JUMLAH HARGA ALAT 5,000.00
D. Jumlah (A+B+C) 338,500.00
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E) 338,500.00
ITEM PEMBAYARAN NO. : Analisa Praktis - 21 ANALISA TERAPAN
KODE/ JENIS PEKERJAAN : Pemasangan Lampu SL 20 Watt + Downlight Metal Ø 4"
SATUAN PEMBAYARAN : Buah
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Upah Pasang Ls 1.000 8,500.00 8,500.00
JUMLAH TENAGA KERJA 8,500.00
B. BAHAN :
Lampu Philips 20 Watt - Bh 1.000 70,000.00 70,000.00
Down Light Metal Ø 4" - Bh 1.000 55,000.00 55,000.00
JUMLAH HARGA BAHAN 125,000.00
C. PERALATAN :
Material Bantu/ Alat Bantu Ls 1.000 5,000.00 5,000.00
JUMLAH HARGA ALAT 5,000.00
D. Jumlah (A+B+C) 138,500.00
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E) 138,500.00
ITEM PEMBAYARAN NO. : Analisa Praktis - 22 ANALISA TERAPAN
KODE/ JENIS PEKERJAAN : Pemasangan Lampu SL 18 Watt + Downlight Metal Ø 4"
SATUAN PEMBAYARAN : Buah
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Upah Pasang Ls 1.000 8,500.00 8,500.00
JUMLAH TENAGA KERJA 8,500.00
B. BAHAN :
Lampu Philips 18 Watt - Bh 1.000 65,000.00 65,000.00
Down Light Metal Ø 4" - Bh 1.000 55,000.00 55,000.00
JUMLAH HARGA BAHAN 120,000.00
C. PERALATAN :
Material Bantu/ Alat Bantu Ls 1.000 5,000.00 5,000.00
JUMLAH HARGA ALAT 5,000.00
D. Jumlah (A+B+C) 133,500.00
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E) 133,500.00
Halaman-8
ITEM PEMBAYARAN NO. : Analisa Praktis - 23 ANALISA TERAPAN
KODE/ JENIS PEKERJAAN : Pemasangan Lampu SL 8 Watt + Downlight Metal Ø 3"
SATUAN PEMBAYARAN : Buah
Halaman-9
ITEM PEMBAYARAN NO. : Analisa Praktis - 26 ANALISA TERAPAN
KODE/ JENIS PEKERJAAN : Pemasangan Exhaust Fan
SATUAN PEMBAYARAN : Set
Halaman-10
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 414,720.00
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E) 414,720.00
Halaman-11
ITEM PEMBAYARAN NO. : AHSP - A.4.6.2.8.a AHSP - A.4.6.2
KODE/ JENIS PEKERJAAN : Pemasangan Grendel Jendela
SATUAN PEMBAYARAN : Buah
VIII. AHSP - A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
Halaman-16
A. TENAGA :
Pekerja L.01 Org/Hari 0.250 97,000.00 24,250.00
Tukang Batu L.02 Org/Hari 0.125 115,000.00 14,375.00
Kepala Tukang L.03 Org/Hari 0.013 125,000.00 1,625.00
Mandor L.04 Org/Hari 0.013 - -
JUMLAH TENAGA KERJA 40,250.00
B. BAHAN :
Keramik Ukuran 60 cm x 60 cm - Buah 2.800 60,000.00 168,000.00
Semen Portland - Kg 9.800 1,340.00 13,132.00
Semen Warna - Kg 1.300 15,000.00 19,500.00
Pasir Pasang - M3 0.045 190,000.00 8,550.00
JUMLAH HARGA BAHAN 209,182.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 249,432.00
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E) 249,432.00
Halaman-17
RENCANA ANGGARAN BIAYA (RAB)
Pasangan Batu
ume Kaki = Panjang x b x h2
b h2
2.9 Mᶟ
0.4 0.2
ume Dinding = panjang x ((a+b)/2) x h1 (volume trapesium)
a b h1
9.12
0.25 0.4 0.6
ume Total = Volume Kaki + Volume Dinding
V Dinding
12.0 Mᶟ
9.1
JUMLAH TOTAL
PERHITUNGAN KEBUTUHAN CAT JML /KG JML PAIL
JUMLAH JUMLAH HARGA CAT /25kg
8 Rp 6,480,000 JUMLAH KLS : 8 25
2 Rp 1,620,000 JUMLAH/Kg CAT DINDING 19.1 153 6.1
16 Rp 12,960,000 JUMLAH/Kg CAT PLAFOND DALAM&LUAR 9.4 75 3.0
49 Rp 3,822,000 JUMLAH/Kg CAT TIANG 1.4 12 0.5
15 Rp 1,170,000 JUMLAH/Kg CAT KAYU 2.3 19
13 Rp 702,000 JUMLAH/Kg CAT LIST HITAM 0.7 6
4 Rp 120,000 JUMLAH THINER 0.2 5
4 Rp 57,600 RUMUS PERHITUNGAN PENGECATAN KELAS
4 Rp 86,400 DAYA SEBAR PER SATU LAPIS PENGECATAN TEMBOK YAITU 12M²/Kg cat
DAYA SEBAR PER SATU LAPIS
4 Rp 105,600 BERAT JENIS CAT TEMBOK 1.4 KG/LITER BERAT JENIS CAT KAYU 1.2 KG/LITER
15 Rp 180,000 1 UKURAN LUAS KELAS 8 METER X 9 METER = 72 M²
Rp - 2 TINGGI DINDING ±4 M
3 PLAFOND DALAM SAMA DENGAN LUAS KELAS
Rp 27,303,600
4 PLAFOND LUAR TERDIRI DARI LEBAR SELASAR DEPAN 2 M DI TAMBAH RAMBU 1 METER DAN BELA
5 TIANG BALK TIAP KELAS ADA 12 DENGAN UKURAN LEBAR 40 CM DAN TINGGI 30 CM
6 KUSEN JENDELA KELAS ADA 5 LUBANG DENGAN PANJANG 2.1 METER (3BH) DAN LEBAR 1.6 (4 BH)
7 DAUN JENDELA KELAS ADA 10 DAUN DENGAN LEBAR BINGKAI 7 CM DAN TINGGI 75 CM
8 KUSEN PINTU TINGGI 2.8 M LEBAR 1.5 M TEBAL 5 CM X 10 CM
9 DAUN PINTU TINGGI 2.1 M LEBAR 70 CM
PERHITUNGAN DALAM 1 KELAS
A. DINDING 2 X ((8X4X2)+ (9X4))
164 164 M² X 1.4 (BERAT JENIS CAT) : 12 (DAYA SEBAR/Kg)
72 = 19.1 Kg Cat
8.4 B. PLAFOND DALAM 8 X9 = 72 M²
733200 244.4 72 M² X 1.4 (BERAT JENIS CAT) : 12 (DAYA SEBAR/Kg)
= 8.4 Kg Cat
C. PLAFOND LUAR 3 X 8 = 24 M²
8.4 M² X 1.4 (BERAT JENIS CAT) : 12 (DAYA SEBAR/Kg)
=0.98 Kg Cat
D. Tiang 12 x 0.4 x 0.3
8.4 M² X 1.4 (BERAT JENIS CAT) : 12 (DAYA SEBAR/Kg)
= 1.44 Kg Cat
E. KUSEN JENDELA ((2.1 X 3) X (0.05+0.05+0.1)) + ((1.6X4) X (0.05+0.05+0.1)) =
= 1.2 M² X 5 Lubang
= 6 M²
6 M² X 1.2 (BERAT JENIS CAT) : 9 (DAYA SEBAR/Kg)
= 0.8 Kg Cat
F. DAUN JENDELA 0.07 X 0.75 x 4 x 2
= 0.42 X 10 = 4.2 M²
4.2 M² X 1.2 (BERAT JENIS CAT) : 9 (DAYA SEBAR/Kg)
0.56 Kg Cat
G. KUSEN PINTU (2X(0.05X2.8X2)+(0.1X2.80) + 2X((0.05X1.5X2)+(0.1X1.5))
0.56+0.28+0.3+0.3
= 1.44 M²
1.44 M² X 1.2 (BERAT JENIS CAT) : 9 (DAYA SEBAR/Kg)
= 0.192 Kg CAT
H. DAUN PINTU 4 X 0.7 X2.1
= 5.88
5.88 M² X 1.2 (BERAT JENIS CAT) : 9 (DAYA SEBAR/Kg)
= 0.784 Kg CAT
I. LIST BAWAH TEMBOK DAN KERAMIK
10 CM X(2 (8X2)) + (9X2)
5 M²
5 M² X 1.2 (BERAT JENIS CAT) : 9 (DAYA SEBAR/Kg)
= 0.7 Kg CAT
DAYA SEBAR PER SATU LAPIS PENGECATAN KAYU YAITU 9M²/Kg cat
AYA SEBAR/Kg)
YA SEBAR/Kg)
YA SEBAR/Kg)
YA SEBAR/Kg)
X (0.05+0.05+0.1)) =
YA SEBAR/Kg)
1.5X2)+(0.1X1.5))
AYA SEBAR/Kg)
AYA SEBAR/Kg)
SMK
TAHU
Lt.1
Lt.1 XI TKR Lt.1 XI TKR Lt.1 XI TKR Lt.1 XI TKR Lt.1 XII Lt.1 XII
WC SISWA 3 Gudang
A B C D TKR A TKR b
mebelair
Lt.1 R. SDM
Lt.1 BENGKEL TEFAC
Lt. 2 AULA
TKR
Lt.1 R. HUBIN
Lt.2
KANTOR
Lt.1 BENGKEL TEFAC
BENGKEL TEACHING FACTORY 4
LSP P1 TKR
Lt.1 LOBY
KEPSEK
2
Lt.1 R.
GERBANG 1
POS SATPAM
WC
SURYAMA
EDUTEL
EDUTEL
EDUTEL
EDUTEL
LAB.
loby LAB. HK
RT
LAUNDRY
1
TKR TKJ AKUN BDP FARMS HOTEL PERKES
JUMLAH LUAS
NO PXL
(M²)
1 46 X 11 (2) 1012
2 33.5 X 13 (2) 871
3 105 X 11 1155
4 24 X 22 (3) 1584
5 27 X 22 (3) 1782
6 38 X 11 (2) 836
7 19 X 12 (3) 684
8 65 X 11 (2) 1430
9
10
11
JUMLAH TOTAL 9354
DENAH RUANG KBM
SMK PLUS YSB SURYALAYA
TAHUN PELAJARAN 2022/2023
SISWA 2
Lt.2 WC
Lt.2 XI TKJ Lt.2 XI TKJ Lt.2 X
GERBANG 2
C D FARMASI
SISWA 1
Lt. 1 WC
TU ADM REHAB REHAB REHAB
Lt. 1 XII TKR C Lt.1 XI TKJ A Lt.1 XI TKJ B
TANGGA
KEUANGAN KELAS KELAS KELAS
KURIKULUM
Lt.1 R. SDM
Lt.2 LAB. TKJ 1
LT 3 LAB TKJ 2
LT 3 LAB TKJ 3
Lt.1 R.
7
WC
Lt 2 R. GURU
UKS
Lt.1
TANGGA
A B C D
Lt.2 LAB. SIMDIG I
LT.3 LAB
KEPSEK
Lt.1 TU
TKJ 5
ADM
Lt.1 R.
Lt.1 X BDP
PERKES AKUN B AKUN A
K A N T I N
Lantai.2 AREA PARKIR GURU
Lt.1 RUANG
KESISWAAN & BK
Lt.1 LITERASI Lt.1 RUANG SARPRAS
Lt.2 LAB FARMASI Lt.2 LAB KESEHATAN
MESJID AT-TAUBAH
11
RUANG RUANG RUANG
ESKUL ESKUL ESKUL
PERPUSTAKAAN
E A B
9
Lt.1 REHAB DOJO GARASI AA
RPS TKR
WC
RPS TKRO PK
MESJID AT-TAUBAH
10
11 MESJID ATTAUBAH
RENCANA ANGGARAN BIAYA
ALAT TULIS KANTOR
SMK PLUS YSB SURYALAYA
TAHUN ANGGARAN 2023
48,447,000
3,630 33,000 33,000
RENCANA ANGGARAN BIAYA SARANA PRASARANA
ALAT KEBERSIHAN
SMK PLUS YSB SURYALAYA
TAHUN ANGGARAN 2023
PELAKSANAAN
NO URAIAN VOLUME SATUAN HARGA JUMLAH
MINGGU KE- BULAN
KEBERSIHAN, KEINDAHAN DAN KENYAMANAN
I. Kebersihan
1 Sapu Ijuk 220 bh 19,000 4,180,000
2 Pengki 110 bh 13,000 1,430,000
3 Sapu Lidi 110 bh 13,000 1,430,000
4 Lap Pel 110 bh 31,000 3,410,000
5 Lobby Duster 3 bh 678,000 2,034,000
6 Ember Sedang 67 bh 25,000 1,675,000
7 Tempat Sampah Sedang 20 liter 55 bh 55,000 3,025,000
8 Tempat Sampah Besar beroda 4 bh 2,419,000 9,676,000
9 Sikat WC 22 pcs 19,000 418,000
10 Sikat Tangan 22 pcs 13,000 286,000
11 Wiper Kaca 55 pcs 13,000 715,000
12 KANEBO 20 bh 25,000 500,000
13 VIXAL 50 Botol 73,000 3,650,000
Jumlah Total Kebersihan 32,429,000
RENCANA ANGGARAN BIAYA
PERBAIKAN KELISTRIKAN
SMK PLUS YSB SURYALAYA
TAHUN ANGGARAN 2023
650,000.00
448,000.00
684,000.00
273,000.00
7,100,000.00
2,000,000.00
17,000,000.00
132,000.00
2,500,000.00
1,420,000.00
5,922,000.00
990,000.00
40,000.00
22,000.00
106,000.00
156,000.00
459,000.00
621,000.00
87,000.00
66,000.00
80,000.00
40,756,000.00
JUMLAH KET
10,237,000
7,766,000
353,000
297,000
1,692,000
20,345,000
9,884,000
7,766,000
3,177,000
99,000
1,692,000
987,000
23,605,000
9,178,000
2,831,000
4,589,000
594,000
1,692,000
3,145,000
22,029,000
1,728,000
3,948,000
9,550,000
299,000
108,000
9,870,000
37,422,000
5,502,000
72,000
1,976,000
66,000
3,384,000
60,000
792,000
114,000
483,000
513,000
1,272,000
1,411,000
3,278,000
81,848,000
147,827,000
188,583,000
RENCANA ANGGARAN BIAYA
PERBAIKAN CCTV
SMK PLUS YSB SURYALAYA
TAHUN ANGGARAN 2023
PERBAIKAN
TOTAL 117,932,000
BANYAKNYA SATUAN NAMA BARANG HARGA JUMLAH HARGA PROF
PELAKSANAAN
URAIAN VOLUME SATUAN HARGA SATUAN JUMLAH
MINGGU KE- BULAN
I. PENGECATAN GEDUNG KH NOOR ANOM
1 Cat Tembok ENVI dinding 11 Fail 944,000 10,384,000
2 Cat Tembok Metrolite Plafond 5 Fail 817,000 4,085,000
3 Cat Kayu dan Besi Avian (hitam&abu) 26 Kg 79,000 2,054,000
4 cat dinding List (orange) 1 Fail 1,513,000 1,513,000
5 Rolan 2 bh 28,000 56,000
6 Bak Rolan 2 bh 16,000 32,000
7 Koas 2" 2 bh 22,000 44,000
8 Koas 4" 2 bh 43,000 86,000
9 Tiner 7 ltr 34,000 238,000
10 Upah 36 laden 2,880,000
11 Upah 24 tukang 2,520,000
23,892,000
PELAKSANAAN
II. PENGECATAN GEDUNG TEACHING FACTORY VOLUME SATUAN HARGA SATUAN JUMLAH
MINGGU KE- BULAN
1 Cat Tembok Nippon elastex 4 Fail 1,513,000 6,052,000
2 Cat Tembok Metrolite Plafond 3 Fail 817,000 2,451,000
3 cat dinding List (orange) 1 Fail 1,513,000 1,513,000
4 Rolan 1 bh 28,000 28,000
5 Bak Rolan 1 bh 16,000 16,000
6 Cat Besi AVIAN 9 Kg 79,000 711,000
7 Koas 4" 2 bh 43,000 86,000
8 Tiner 1 Kg 27,000 27,000
9 Koas 2" 2 bh 22,000 44,000
10 Upah 27 laden 2,160,000
11 Upah 9 tukang 945,000
14,033,000
PELAKSANAAN
III. PENGECATAN RUANG KELAS BLOK 6 VOLUME SATUAN HARGA SATUAN JUMLAH
MINGGU KE- BULAN
1 Cat Tembok ENVI dinding 9 Fail 944,000 8,496,000
2 Cat Tembok Metrolite Plafond 5 Fail 817,000 4,085,000
3 cat dinding List (orange) 1 Fail 1,513,000 1,513,000
4 Cat Kayu (Avian) 28 Kg 79,000 2,212,000
5 Rolan 2 buah 31,000 62,000
6 Bak Rolan 2 buah 16,000 32,000
7 Koas 2" 2 buah 22,000 44,000
8 Koas 4" 2 buah 43,000 86,000
9 Tiner 8 kg 27,000 216,000
10 Upah 39 laden 3,120,000
11 Upah 13 tukang 1,365,000
21,231,000
PELAKSANAAN
IV. PENGECATAN RUANG KELAS BLOK 1 VOLUME SATUAN HARGA SATUAN JUMLAH
MINGGU KE- BULAN
1 Cat Tembok ENVI dinding 6 Fail 944,000 5,664,000
2 Cat Tembok Metrolite Plafond 3 Fail 817,000 2,451,000
3 cat dinding List (orange) 1 Fail 1,513,000 1,513,000
5 Rolan 2 buah 31,000 62,000
6 Bak Rolan 2 buah 16,000 32,000
7 Koas 2" 2 buah 22,000 44,000
8 Koas 4" 2 buah 43,000 86,000
9 Tiner 8 kg 27,000 216,000
10 Upah 27 laden 2,160,000
11 Upah 9 tukang 945,000
13,173,000
RENCANA ANGGARAN BIAYA
PERBAIKAN KERAMIK
SMK PLUS YSB SURYALAYA
TAHUN ANGGARAN 2023
Jumlah Total
PERBAIKAN KERAMIK
BIAYA
MIK
ALAYA
2023
PELAKSANAAN
JUMLAH
MINGGU KE- BULAN
1,980,000.00
288,000.00
468,000.00
735,000.00
1,535,000
800,000.00
4,271,000.00
PELAKSANAAN
JUMLAH
MINGGU KE- BULAN
660,000.00
144,000.00
156,000.00
315,000.00
635,000
320,000.00
1,595,000.00
PELAKSANAAN
JUMLAH
MINGGU KE- BULAN
19,932,000.00
1,872,000.00
4,212,000.00
6,825,000.00
14,505,000
7,680,000.00
40,521,000.00
PELAKSANAAN
JUMLAH
MINGGU KE- BULAN
10,560,000.00
1,008,000.00
2,262,000.00
1,980,000.00
7,740,000
5,760,000.00
21,570,000.00
PELAKSANAAN
JUMLAH
MINGGU KE- BULAN
1,188,000.00
144,000.00
312,000.00
420,000.00
480,000.00
2,544,000.00
PELAKSANAAN
JUMLAH
MINGGU KE- BULAN
924,000.00
144,000.00
234,000.00
315,000.00
400,000.00
2,017,000.00
PELAKSANAAN
JUMLAH
MINGGU KE- BULAN
21,054,000.00
1,872,000.00
4,446,000.00
7,245,000.00
8,080,000.00
42,697,000.00
PELAKSANAAN
JUMLAH
MINGGU KE- BULAN
990,000.00
144,000.00
234,000.00
420,000.00
400,000.00
2,188,000.00
PELAKSANAAN
JUMLAH
MINGGU KE- BULAN
1,056,000.00
144,000.00
234,000.00
420,000.00
400,000.00
2,254,000.00
119,657,000
AIKAN KERAMIK
RENCANA ANGGARAN BIAYA
PERBAIKAN KUSEN
SMK PLUS YSB SURYALAYA
TAHUN ANGGARAN 2023
BLOK 1 VOLUME SATUAN HARGA SATUAN HARGA SATUAN
JUMLAH TOTAL
PERBAIKAN KUSEN
294
PELAKSANAAN
JUMLAH
MINGGU KE- BULAN
2,100,000.00
240,000.00
###
360,000.00 ###
390,000.00 ###
660,000.00 ###
1,440,000.00 ###
- ###
5,190,000.00 ###
PELAKSANAAN
JUMLAH
MINGGU KE- BULAN
1,320,000.00 ###
2,160,000.00 ###
240,000.00 ###
240,000.00 ###
- ###
864,000.00 ###
240,000.00 ###
1,519,200.00 ###
6,583,200.00
PELAKSANAAN
JUMLAH
MINGGU KE- BULAN
3,840,000.00
6,480,000.00
720,000.00
720,000.00
1,224,000.00
-
720,000.00
4,111,200.00
17,815,200.00
PELAKSANAAN
JUMLAH
MINGGU KE- BULAN
6,660,000.00
12,960,000.00
1,440,000.00
1,440,000.00
2,448,000.00
-
1,440,000.00
5,280,000
9,500,400
41,168,400.00
PELAKSANAAN
JUMLAH
MINGGU KE- BULAN
1,440,000.00
2,160,000.00
240,000.00
240,000.00
-
864,000.00
240,000.00
1,555,200.00
6,739,200.00
PELAKSANAAN
JUMLAH
MINGGU KE- BULAN
3,384,000.00
12,960,000.00
1,440,000.00
-
1,224,000.00
-
-
5,702,400.00
24,710,400.00
PELAKSANAAN
JUMLAH
MINGGU KE- BULAN
18,672,000.00
4,320,000.00
480,000.00
480,000.00
204,000.00
8,424,000.00
4,396,800.00
11,093,040.00
48,069,840.00
PELAKSANAAN
JUMLAH
MINGGU KE- BULAN
768,000.00
3,840,000.00
4,992,000.00
2,688,000.00
5,376,000.00
1,152,000.00
2,940,000.00
2,058,000.00
2,646,000.00
3,234,000.00
672,000.00
9,109,800.00
39,475,800.00
189,752,040.00
ITEM PEMBAYARAN NO.: Analisa Praktis - 01
KODE/ JENIS PEKERJAA : Pemasangan Rangka Atap Baja Ringan
SATUAN PEMBAYARAN : M2
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.250
Tukang Kayu L.02 OH 0.150
Kepala Tukang L.03 OH 0.015
Mandor L.04 OH 0.013
JUMLAH TENAGA KERJ
B BAHAN
Nok genteng metal bh 1.100
paku biasa 1/2" - 1" kg 0.050
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.100
Tukang Kayu L.02 OH 0.200
Kepala Tukang L.03 OH 0.020
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJ
B BAHAN
Woodplank m' 1.050
Paku 1 - 2,5 cm Kg 0.100
JUMLAH HARGA BAHAN
C PERALATAN
1 Pas. Baja Ringan Zinc Alum c75, Tebal Standar 0,7/0,75 mm 26.4 22
97,000.00 17,460.00
115,000.00 27,600.00
125,000.00 2,250.00
- -
UMLAH TENAGA KERJA 47,310.00
130,000.00 47,710.00
80,000.00 58,640.00
20,000.00 500.00
700.00 9,800.00
500.00 10,000.00
UMLAH HARGA BAHAN 126,650.00
- -
UMLAH HARGA ALAT -
173,960.00
173,960.00
ANALISA TERAPAN
97,000.00 24,250.00
115,000.00 34,500.00
125,000.00 3,125.00
- -
UMLAH TENAGA KERJA 61,875.00
75,000.00 27,300.00
25,000.00 25,625.00
3,500.00 10,500.00
31,000.00 4,650.00
3,000.00 12,000.00
UMLAH HARGA BAHAN 80,075.00
- -
UMLAH HARGA ALAT -
141,950.00
141,950.00
97,000.00 19,400.00
115,000.00 11,500.00
125,000.00 1,250.00
-
JUMLAH TENAGA KERJA 32,150.00
79,800.00 81,396.00
19,400.00 3,880.00
JUMLAH HARGA BAHAN 85,276.00
117,426.00
117,400.00
Jumlah
Harga Satuan
Harga
(Rp.)
(Rp.)
67,000.00 16,750.00
80,000.00 12,000.00
90,000.00 1,350.00
90,000.00 1,170.00
JUMLAH TENAGA KERJA 31,270.00
54,600.00 60,060.00
19,400.00 970.00
JUMLAH HARGA BAHAN 61,030.00
92,300.00
92,300.00
Jumlah
Harga Satuan
Harga
(Rp.)
(Rp.)
67,000.00 6,700.000
80,000.00 16,000.000
90,000.00 1,800.000
90,000.00 450.000
JUMLAH TENAGA KERJA 24,950.000
15,200.00 15,960.000
19,400.00 1,940.000
JUMLAH HARGA BAHAN 17,900.00
42,800.00
Jumlah Total
REHAB ATAP GD NOOR ANOM
ITEM PEMBAYARAN NO.: Analisa Praktis - 01
KODE/ JENIS PEKERJAA : Pemasangan Rangka Atap Baja Ringan
SATUAN PEMBAYARAN : M2
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.250
Tukang Kayu L.02 OH 0.150
Kepala Tukang L.03 OH 0.015
Mandor L.04 OH 0.013
JUMLAH TENAGA KERJA
B BAHAN
Nok genteng metal bh 1.100
paku biasa 1/2" - 1" kg 0.050
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.100
Tukang Kayu L.02 OH 0.200
Kepala Tukang L.03 OH 0.020
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Woodplank m' 1.050
Paku 1 - 2,5 cm Kg 0.100
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
97,000.00 17,460.00
115,000.00 27,600.00
125,000.00 2,250.00
- -
UMLAH TENAGA KERJA 47,310.00
130,000.00 47,710.00
80,000.00 58,640.00
20,000.00 500.00
700.00 9,800.00
500.00 10,000.00
UMLAH HARGA BAHAN 126,650.00
- -
UMLAH HARGA ALAT -
173,960.00
173,960.00
ANALISA TERAPAN
97,000.00 24,250.00
115,000.00 34,500.00
125,000.00 3,125.00
- -
UMLAH TENAGA KERJA 61,875.00
75,000.00 27,300.00
25,000.00 25,625.00
3,500.00 10,500.00
31,000.00 4,650.00
3,000.00 12,000.00
UMLAH HARGA BAHAN 80,075.00
- -
UMLAH HARGA ALAT -
141,950.00
141,950.00
97,000.00 19,400.00
115,000.00 11,500.00
125,000.00 1,250.00
-
JUMLAH TENAGA KERJA 32,150.00
79,800.00 81,396.00
19,400.00 3,880.00
JUMLAH HARGA BAHAN 85,276.00
117,426.00
117,400.00
Jumlah
Harga Satuan
Harga
(Rp.)
(Rp.)
67,000.00 16,750.00
80,000.00 12,000.00
90,000.00 1,350.00
90,000.00 1,170.00
JUMLAH TENAGA KERJA 31,270.00
54,600.00 60,060.00
19,400.00 970.00
JUMLAH HARGA BAHAN 61,030.00
92,300.00
92,300.00
Jumlah
Harga Satuan
Harga
(Rp.)
(Rp.)
67,000.00 6,700.000
80,000.00 16,000.000
90,000.00 1,800.000
90,000.00 450.000
JUMLAH TENAGA KERJA 24,950.000
15,200.00 15,960.000
19,400.00 1,940.000
JUMLAH HARGA BAHAN 17,900.00
42,850.00
42,800.00
Jumlah Total
REHAB ATAP R.KELAS B.3
RENCANA ANGGARAN BIAYA
PERMBUATAN KIRMIR
SMK PLUS YSB SURYALAYA
TAHUN ANGGARAN 2023
BAHAN
NO HARGA JUMLAH HARGA
BAHAN VOLUME SATUAN
1 BATU 14 M3 DT 235,000 3,290,000
2 PASIR 6 M3 DT 190,000 1,140,000
3 SEMEN 19 ZAK 78,000 1,482,000
JUMLAH 5,912,000
1 PEKERJA 18 80,000 1,440,000
2 TUKANG 9 105,000 945,000
JUMLAH 2,385,000
JUMLAH TOTAL 8,297,000
PERMBUATAN KIRMIR
RENCANA AKSI
BULAN MINGGU
PELAKSANAAN
NO URAIAN VOLUME SATUAN HARGA SATUAN JUMLAH
MINGGU KE- BULAN
PELAKSANAAN
NO URAIAN VOLUME SATUAN HARGA SATUAN JUMLAH
MINGGU KE- BULAN
C PENGHIJAUAN AREA SEKOLAH
I. Pembuatan Taman
1 Pasir 4 M3 120,000.00 480,000.00
2 semen 8 sak 76,000.00 608,000.00
3 Bata Merah 1500 buah 700.00 1,050,000.00
4 Tanah Gembur 50 karung 55,000.00 2,750,000.00
5 Rumput gajah 252 M2 35,000.00 8,820,000.00
6 Tanaman Perdu 4 Varian 1,000,000.00 4,000,000.00
7 Pupuk Kompos 5 karung 20,000.00 100,000.00
7 Upah 5 org 1,440,000.00 7,200,000.00
Jumlah Total Pembuatan Taman 25,008,000.00
II. Penggantian Tanaman Rusak -
1 Tanaman Calatea 9 pohon 17,000.00 153,000.00
2 Tanaman Pucuk Merah 7 pohon 35,000.00 245,000.00
3 Pot Besar 6 buah 75,000.00 450,000.00
4 Pot Sedang 6 buah 50,000.00 300,000.00
Jumlah Total Penggantian Tanaman Rusak 1,148,000.00
III. Perawatan Tanaman
1 Pupuk Kompos 4 Karung 20,000.00 80,000.00
2 Pupuk Kimia 12 Kg 25,000.00 300,000.00
3 Pembunuh Hama 12 Kg 35,000.00 420,000.00
4 Semprotan 1 buah 375,000.00 375,000.00
Jumlah Total Perawatan Tanaman 1,175,000.00