DAFTAR REKAPITULASI
HARGA PERKIRAAN SENDIRI
(HPS)
HARGA JUMLAH
NO.
NO. ANALISA URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN HARGA
URUT
( Rp ) ( Rp )
1 2 3 4 5 6 7 8
1 1.1.4.b Pembuatan Papan Nama Proyek
Papan Proyek
A TENAGA KERJA
1 Pekerja L.01 OH 0.750 90,000.00 67,500.00
2 Tukang batu L.02 OH 0.750 110,000.00 82,500.00
3 Kepala tukang L.03 OH 0.100 120,000.00 12,000.00
4 Mandor L.04 OH 0.075 120,000.00 9,000.00
JUMLAH HARGA TENAGA KERJA 171,000.00
B BAHAN
1 Multiplek tebal 9 mm M.38.b Lbr 0.180 97,500.00 17,550.00
2 Tiang Kayu 5/7 Kelas II, tinggi 3 m M. 37.b m3 0.021 4,750,000.00 99,750.00
3 Banner plastik ukuran 0,6 x 0,8 m 2 M. 124.b m2 0.480 45,000.00 21,600.00
4 Paku campuran 5 cm dan 7 cm M.72.b Kg 1.250 20,000.00 25,000.00
JUMLAH HARGA BAHAN 163,900.00
C PERALATAN
JUMLAH HARGA PERALATAN 0
B BAHAN
1 Mistar Ukur Allumunium, lebar M.76.a m' 1.000 350,000.00 350,000.00
2 Pasangan bata merah 1pc: 4ps P.02.c.2) m3 0.090 0.00 -
3 Batang skoor L.40.40.4 M.59.d kg 5.500 7,550.00 41,525.00
4 Pelat setrip / 3x30x300mm M.58.f kg 0.500 20,000.00 10,000.00
5 Dynabol/raamset dia 8 mm panjaM.65.a Buah 4.000 2,500.00 10,000.00
JUMLAH HARGA BAHAN 411,525.00
C PERALATAN
JUMLAH HARGA PERALATAN 0
B BAHAN
JUMLAH HARGA BAHAN 0
C PERALATAN
JUMLAH HARGA PERALATAN 0
A TENAGA KERJA
1 Pekerja L.01 OH 1.400 90,000.00 126,000.00
2 Mandor L.04 OH 0.140 120,000.00 16,800.00
JUMLAH HARGA TENAGA KERJA 142,800.00
B BAHAN
JUMLAH HARGA BAHAN 0
C PERALATAN*)
1 Palu/godam (baja keras) To.25.b buah 0.006 88,000.00 528.00
2 Pahat beton (baja keras) To.25.a buah 0.009 40,000.00 360.00
3 Linggis (baja keras) To.20 buah 0.020 70,000.00 1,400.00
JUMLAH HARGA PERALATAN 2,288.00
A TENAGA KERJA
Pekerja L.01 OH 1.500 90,000.00 135,000.00
Tukang batu L.02 OH 0.150 110,000.00 16,500.00
Mandor L.04 OH 0.150 120,000.00 18,000.00
JUMLAH HARGA TENAGA KERJA 169,500.00
B BAHAN
Batu belah m3 1.200 225,000.00 270,000.00
Semen Portlan (SP) Kg 202.000 1,480.00 298,960.00
Pasir Pasang (PP) m3 0.485 200,000.00 97,000.00
JUMLAH HARGA BAHAN 665,960.00
C PERALATAN
JUMLAH HARGA PERALATAN 0
A TENAGA KERJA
1 Pekerja L.01 OH 1.500 90,000.00 135,000.00
2 Tukang batu L.02 OH 0.500 110,000.00 55,000.00
3 Mandor L.04 OH 0.150 120,000.00 18,000.00
JUMLAH HARGA TENAGA KERJA 208,000.00
B BAHAN
1 Batu belah m3 1.200 225,000.00 270,000.00
2 Semen Portlan (SP) Kg 163.0 1,480.00 241,240.00
3 Pasir Pasang (PP) m3 0.520 200,000.00 104,000.00
JUMLAH HARGA BAHAN 615,240.00
C PERALATAN
JUMLAH HARGA PERALATAN 0
A TENAGA KERJA
Pekerja L.01 OH 1.500 90,000.00 135,000.00
Tukang batu L.02 OH 0.150 110,000.00 16,500.00
Mandor L.04 OH 0.150 120,000.00 18,000.00
JUMLAH HARGA TENAGA KERJA 169,500.00
B BAHAN
Batu belah m3 1.200 225,000.00 270,000.00
Semen Portlan (SP) Kg 252 1,480.00 372,960.00
Pasir Pasang (PP) m3 0.440 200,000.00 88,000.00
JUMLAH HARGA BAHAN 730,960.00
C PERALATAN
JUMLAH HARGA PERALATAN 0
P.04.i Plesteran tebal 1,5 cm, dengan mortar tipe S, fc' = 12,5 MPa
A TENAGA KERJA
Pekerja L.01 OH 0.130 90,000.00 11,700.00
Tukang batu L.02 OH 0.130 110,000.00 14,300.00
Kepala tukang L.03 OH 0.013 120,000.00 1,560.00
Mandor L.04 OH 0.013 120,000.00 1,560.00
JUMLAH HARGA TENAGA KERJA 29,120.00
B BAHAN
Semen Portlan (SP) kg 7.776 1,480.00 11,508.48
Pasir Pasang (PP) m3 0.023 200,000.00 4,600.00
JUMLAH HARGA BAHAN 16,108.48
C PERALATAN
JUMLAH HARGA PERALATAN 0
A TENAGA KERJA
1 Pekerja L.01 OH 0.240 90,000.00 21,600.00
2 Tukang kayu L.02 OH 0.120 110,000.00 13,200.00
3 Kepala tukang L.03 OH 0.012 120,000.00 1,440.00
4 Mandor L.04 OH 0.024 120,000.00 2,880.00
JUMLAH HARGA TENAGA KERJA 39,120.00
B BAHAN
1 Multiflex12 atau 18mm M.52.d Lembar 0.091 120,000.00 10,920.00
2 Kaso 5/7 cm M.50.a m3 0.003 3,000,000.00 9,000.00
3 Paku 5 cm dan 7 cm M.77.b kg 0.24 20,000.00 4,800.00
4 Minyak bekisting M.141.b Liter 0.2 6,000.00 1,200.00
JUMLAH HARGA BAHAN 25,920.00
C PERALATAN
JUMLAH HARGA PERALATAN 0
B.01.a Beton fc'=1,8 s.d 3,7 MPa (setara K-40 s.d. K-60)
A TENAGA KERJA
1 Pekerja L.01 OH 1.200 90,000.00 108,000.00
2 Tukang batu L.02 OH 0.200 110,000.00 22,000.00
3 Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
4 Mandor L.04 OH 0.120 120,000.00 14,400.00
JUMLAH HARGA TENAGA KERJA 146,800.00
B BAHAN
1 PC / Portland cement M.23 kg 200 1,480.00 296,000.00
2 PB / Pasir beton M.05.a.3 kg 730 142.86 104,285.71
3 Kr / Kerikil M.04.d.3 kg 1,164 194.44 226,333.33
4 Air M.02.a.3) Liter 215 10.00 2,150.00
JUMLAH HARGA BAHAN 628,769.05
C PERALATAN
A TENAGA KERJA
1 Pekerja L.01 OH 1.6500 90,000.00 148,500.00
2 Tukang batu L.02 OH 0.2750 110,000.00 30,250.00
3 Kepala tukang L.03 OH 0.0275 120,000.00 3,300.00
4 Mandor L.04 OH 0.1650 120,000.00 19,800.00
JUMLAH HARGA TENAGA KERJA 201,850.00
B BAHAN
1 PC / Portland cement M.23 kg 276.00 1,480.00 408,480.00
2 PB / Pasir beton M.05.a.3 kg 828.00 142.86 118,285.71
3 Kr / Kerikil M.04.d.3 kg 1,012.00 194.44 196,777.78
4 Air M.02.a.3) Liter 215.00 10.00 2,150.00
JUMLAH HARGA BAHAN 725,693.49
C PERALATAN
JUMLAH HARGA PERALATAN 0
B BAHAN
1 PC / Portland cement M.23 kg 326 1,480.00 482,480.00
2 PB / Pasir beton M.05.a.3 kg 760 142.86 108,571.43
3 Kr / Kerikil M.04.d.3 kg 1029 194.44 200,083.33
4 Air M.02.a.3) Liter 215 10.00 2,150.00
JUMLAH HARGA BAHAN 793,284.76
C PERALATAN
A TENAGA KERJA
1 Pekerja L.01 OH 0.700 90,000.00 63,000.00
2 Tukang batu L.02 OH 0.700 110,000.00 77,000.00
3 Kepala tukang L.03 OH 0.070 120,000.00 8,400.00
4 Mandor L.04 OH 0.070 120,000.00 8,400.00
JUMLAH HARGA TENAGA KERJA 156,800.00
B BAHAN
1 Besi Beton (polos / Ulir ) M.60.d kg 105.00 13,500.00 1,417,500.00
2 Kawat tali beton M.72 kg 1.50 24,000.00 36,000.00
JUMLAH HARGA BAHAN 1,453,500.00
C PERALATAN
JUMLAH HARGA PERALATAN 0
A TENAGA KERJA
1 Pekerja L.01 OH 2.940 90,000.00 264,600.00
2 Tukang Las L.02 OH 1.470 110,000.00 161,700.00
3 Kepala Tukang L.03 OH 0.147 120,000.00 17,640.00
4 Mandor L.04 OH 0.294 120,000.00 35,280.00
JUMLAH HARGA TENAGA KERJA 479,220.00
B BAHAN
1 Besi pengaku M.59.g kg 8.820 68,750.00 606,375.00
2 Kawat las listrik M.74 kg 1.960 450,000.00 882,000.00
3 Campuran beton fc'=19,3 Mpa B.07a m3 0.088 1,020,297.84 89,786.21
4 Pasangan bata, mortar tipe N P.02c m3 0.176 905,564.00 159,379.26
JUMLAH HARGA BAHAN 1,737,540.47
C PERALATAN
1 Pintu air **) M.xx.x buah 1.00 8,714,425.00 8,714,425.00
2 Tackle/Tripod tinggi 4-5m To.40.h Hari 0.44 500,000.00 220,000.00
3 Mesin las listrik 250A E.25.a Hari 0.44 1,376,000.00 605,440.00
JUMLAH HARGA PERALATAN 9,539,865.00
B BAHAN
1 Besi pengaku M.59.g kg 8.820 68,750.00 606,375.00
2 Kawat las listrik M.74 kg 1.960 450,000.00 882,000.00
3 Campuran beton fc'=19,3 Mpa B.07a m3 0.088 1,020,297.84 89,786.21
4 Pasangan bata, mortar tipe N P.02c m3 0.176 905,564.00 159,379.26
JUMLAH HARGA BAHAN 1,737,540.47
C PERALATAN
1 Pintu air **) M.xx.x buah 1.00 7,670,413.00 7,670,413.00
2 Tackle/Tripod tinggi 4-5m To.40.h Hari 0.44 500,000.00 220,000.00
3 Mesin las listrik 250A E.25.a Hari 0.44 1,376,000.00 605,440.00
JUMLAH HARGA PERALATAN 8,495,853.00
A TENAGA KERJA
1 Pekerja L.01 OH 2.940 110,000.00 323,400.00
2 Tukang Las L.02 OH 1.470 120,000.00 176,400.00
3 Kepala Tukang L.03 OH 0.147 120,000.00 17,640.00
4 Mandor L.04 OH 0.294 - -
JUMLAH HARGA TENAGA KERJA 517,440.00
B BAHAN
1 Besi pengaku M.59.g kg 8.820 68,750.00 606,375.00
2 Kawat las listrik M.74 kg 1.960 450,000.00 882,000.00
3 Campuran beton fc'=19,3 Mpa B.07a m3 0.088 905,564.00 79,689.63
4 Pasangan bata, mortar tipe N P.02c m3 0.176 - -
JUMLAH HARGA BAHAN 1,568,064.63
C PERALATAN
1 Pintu air **) M.xx.x buah 1.00 6,996,735.00 6,996,735.00
2 Tackle/Tripod tinggi 4-5m To.40.h Hari 0.44 500,000.00 220,000.00
3 Mesin las listrik 250A E.25.a Hari 0.44 1,376,000.00 605,440.00
JUMLAH HARGA PERALATAN 7,822,175.00
18 T.15.a.8) Angkut 1 m3 material atau hasil galian dengan jarak angkut 300 m
A TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN 0
C PERALATAN
JUMLAH HARGA PERALATAN 0
Pekerja 1.200
Bongkar Pasangan Batu
2 Mandor 0.120
Pekerja 1.500
Pasangan Batu Tukang Batu 0.750
3 Mandor 0.075
Pekerja 0.130
4 Tukang Batu 0.130
Plasteran
Kepala Tukang 0.013
Mandor 0.013
Pekerja 1.6500
Tukang Batu 0.2750
5 Beton
Kepala Tukang 0.0275
Mandor 0.1650
Pekerja 0.007
Tukang Batu 0.007
6 Besi
Kepala Tukang 0.001
Mandor 0.001
Pekerja 0.240
Tukang Batu 0.120
7 Bekisting
Kepala Tukang 0.012
Mandor 0.024
SI MAPPEKKAI
Volume Total Tenaga Kontrak Total Kebutuhan Tenaga
0.00 0 150 0
0 0 150 0
1&2 = 210.00 +
=
Area m2 = 1+2
= 2.10 126
Area m2 = 1+2 JUMLAH B 52
= 5109.00 + 10,000.00 = 2.10 x 178 = 373.8 M2 178
JUMLAH A
= 0.51 m2 x 178 = 90.94 m3 C. BONGKARANG BATU
389
1 0.00 211 M
B. PLASTERAN
1&2 = 210.00 +
=
Area m2 = 1+2
= 2.10 63
Area m2 = 1+2 JUMLAH B 225
= 5109.00 + 10,000.00 = 2.10 x 211 = 443.4 M2 90.00
JUMLAH A
= 0.51 m2 x 211 = 107.88 m3 C. BONGKARANG BATU 49.0 378.00
Area m2 = 1+2
= 3450.00 + 10,000.00
JUMLAH A
= 0.35 m2 x 7 = 2.42 m3
63
Area m2 = 1+2 225
= 51546.00 + 10,000.00 90.00
JUMLAH A 50.00
= 5.15 m2 x 5 = 25.77 m3 49.0 49.0
477.00
Area m2 = 1+2
= 9995.00 + 10,000.00
JUMLAH A
= 1.00 m2 x 5 = 5.00 m3
pekerjaan bendung
2 0.00 10.40 M
pasangan batu
63
Area m2 = 1+2
= 100360.00 + 10,000.00
JUMLAH A
= 10.04 m2 x 10 = 104.37 m3
Area m2 = 1+2
= 25000.00 + 10,000.00 1&2 = 250.00 +
JUMLAH A =
= 2.50 m2 x 10 = 25.00 m3 Area m2 = 1+2
= 2.50
JUMLAH B
= 2.50 x 10 = 25.0 M2
Area m2 = 1+2
= 25000.00 + 10,000.00 1&2 = 250.00 +
JUMLAH A =
= 2.50 m2 x 10 = 25.00 m3 Area m2 = 1+2
= 2.50
JUMLAH B
= 2.50 x 10 = 25.0 M2
BACK UP DATA BILL OF QUANTITY (BOQ)
Area m2 = 1
= 0.06 + 0.04
JUMLAH A
0.20
= 0.10 m2 x 25.00 = 2.50 m3
0.20
P.8 REHABILITASI SALURAN 25.00 M
A. PEKERJAAN GALIAN TANAH
Area m2 = 1 0.20
= 0.06 + 0.04
JUMLAH A
= 0.10 m2 x 25.00 = 2.50 m3
2
0.20
Area m2 = 1
= 0.06 + 0.04
JUMLAH A
= 0.10 m2 x 15.00 = 1.50 m3
1
2
0.20
2
0.20
Disetujui Diperiksa Oleh, Dibuat Oleh,
Pengawas Direksi Konsultan Pengawas Kontraktor Pelaksana
SUB KEG.REHABILITASI JARINGAN PT. INDO PRATAMA SARI CV. WUDI PERMATA
IRIGASI PERMUKAAN
Area m2 = 1
= 0.06 + 0.04
JUMLAH A
0.20
= 0.10 m2 x 2.00 = 0.20 m3
0.20
P.12 REHABILITASI SALURAN 5.50 M
A. PEKERJAAN GALIAN TANAH
Area m2 = 1
= 0.06 + 0.04
0.20
JUMLAH A
= 0.10 m2 x 5.50 = 0.55 m3
2
0.20
Area m2 = 1
= 0.06 + 0.04
JUMLAH A
= 0.10 m2 x 1.90 = 0.19 m3
2
0.20
2
0.20
Disetujui Diperiksa Oleh, Dibuat Oleh,
Pengawas Direksi Konsultan Pengawas Kontraktor Pelaksana
SUB KEG.REHABILITASI JARINGAN PT. INDO PRATAMA SARI CV. WUDI PERMATA
IRIGASI PERMUKAAN
Area m2 = 1
= 0.06 + 0.04
JUMLAH A
0.20
= 0.10 m2 x 31.00 = 3.10 m3
0.20
P.15 REHABILITASI SALURAN 6.90 M
A. PEKERJAAN GALIAN TANAH
Area m2 = 1
= 0.06 + 0.04
0.20
JUMLAH A
= 0.10 m2 x 6.90 = 0.69 m3
2
0.20
Disetujui Diperiksa Oleh, Dibuat Oleh,
Pengawas Direksi Konsultan Pengawas Kontraktor Pelaksana
SUB KEG.REHABILITASI JARINGAN PT. INDO PRATAMA SARI CV. WUDI PERMATA
IRIGASI PERMUKAAN
1 = 0.20 + 0.30
x 0.60 = 0.15 m2
2.00
Area m2 = 1
= 0.15
0.20
JUMLAH A
= 0.15 m2 x 25.00 = 3.75 m3
1 0.60
0.30
P.1 REHABILITASI SALURAN 25.00 M
A. BONGKARANG PASANGAN BATU
1 = 0.20 + 0.30
x 0.60 = 0.15 m2
2.00
Area m2 = 1
= 0.15
0.20
JUMLAH A
= 0.15 m2 x 25.00 = 3.75 m3
1
0.30 0.60
1 = 0.20 + 0.30
x 0.60 = 0.15 m2
2.00
Area m2 = 1
= 0.15
0.20
JUMLAH A
= 0.15 m2 x 25.00 = 3.75 m3
1 0.60
0.30
0.30
Disetujui Diperiksa Oleh, Dibuat Oleh,
Pengawas Direksi Konsultan Pengawas Kontraktor Pelaksana
SUB KEG.REHABILITASI JARINGAN PT. INDO PRATAMA SARI CV. WUDI PERMATA
IRIGASI PERMUKAAN
1 = 0.20 + 0.30
x 0.60 = 0.15 m2
2.00
Area m2 = 1
= 0.15
0.20
JUMLAH A
= 0.15 m2 x 25.00 = 3.75 m3
1 0.60
0.30
P.4 REHABILITASI SALURAN 25.00 M
A. BONGKARANG PASANGAN BATU
1 = 0.20 + 0.30
x 0.60 = 0.15 m2
2.00
Area m2 = 1
= 0.15
0.20
JUMLAH A
= 0.15 m2 x 25.00 = 3.75 m3
0.30 1 0.60
1 = 0.20 + 0.30
x 0.60 = 0.15 m2
2.00
Area m2 = 1
= 0.15
0.20
JUMLAH A
= 0.15 m2 x 8.33 = 1.25 m3
1 0.60
0.30
0.30
Disetujui Diperiksa Oleh, Dibuat Oleh,
Pengawas Direksi Konsultan Pengawas Kontraktor Pelaksana
SUB KEG.REHABILITASI JARINGAN PT. INDO PRATAMA SARI CV. WUDI PERMATA
IRIGASI PERMUKAAN
Suplesi induk
Pasangan Batu 173.94 50.78 224.72 256.87 -32.15 0.52
Plesteran 652.83 76.94 729.77 814.54 -84.77 -61.8320192307693
k40 2.63 2.63 7.4 -4.77
k175 14.66 89.26 103.92 145.64 -41.72
pembesian 532.82 #REF! #REF! 3705.48 #REF!
bekisting 113.66 13.86 127.52 405.25 -277.74 138.7
-68.4098936170213
66.6666666666667
3.234
32.15
67.684210526316
BACK UP DATA BILL OF QUANTITY (BOQ)
NO.
2 REHABILITASI TUBUH BENDUNG
1. PEKERJAAN BETON K175 ( PENGURAS) 4. PEKERJAAN PEMBESIAN 5. PEKERJAAN BEKISTING
JUMLAH TOTAL
= 29.42 + 31.06 + + 23.97
24.85 + 23.97 + 24.85
= 158.1 kg
8 K175 9 K175
Ø10 -150 Ø10 -150
1.00 1.00
0.10
0.15
BACK UP DATA BILL OF QUANTITY (BOQ)
2 0.50
Area m2 = 1
= 1.82 + 0.45
0.90
JUMLAH A
= 2.27 m2 x 0.45 = 1.02 m3
0.25
A PEKERJAAN PASANGAN BATU 1.90 M 1 = 0.25 + 0.70 = 0.95 M 1.20
0.35
Area m2 = 1 + 2
0.35
= 0.21 : 0.21 = 0.42
JUMLAH 3
= 0.42 m2 x 1.90 = 0.80 m3
KEGIATAN : 0.00
PEKERJAAN : 0.00
LOKASI : 0.00
KONTRAKTOR PELAKSANA : 0.00
Tulangan pokok
= 1.00 m : 0.15 = 6.00 bh 2 = 0.00 m
6 = 0.15 x 1.00 = 0.15 m3 = 6.00 bh x 4.00 m = 23.99 m
= 23.99 x 0.89 = 21.30 Kg 2 = 1.00 m
m3 Tulangan pembagi JUMLAH 4
= 4.00 m : 0.15 = 26.00 bh Area m2 = 5, 6 & 7
m3 = 26.00 bh x 1.00 = 26.00 m = 0.00 + 1.00
= 26.00 x 0.89 = 23.09 Kg = 1.00 x 4.00
JUMLAH 3
JUMLAH 3 = 21.30 + 23.09 = 44.39 kg
Area m2 = 5, 6 & 7
= 0.15 + 0.00 + 0.00
= 0.15 x 4.00 = 0.60 m3
KEGIATAN : 0.00
PEKERJAAN : 0.00
LOKASI : 0.00
KONTRAKTOR PELAKSANA : 0.00
Tulangan pokok
= 1.00 m : 0.15 = 6.00 bh 2 = 0.00 m
6 = 0.10 x 1.00 = 0.10 m3 = 6.00 bh x 4.00 m = 23.99 m
= 23.99 x 0.89 = 21.30 Kg 2 = 1.00 m
m3 Tulangan pembagi JUMLAH 4
= 4.00 m : 0.15 = 26.00 bh Area m2 = 5, 6 & 7
m3 = 26.00 bh x 1.00 = 26.00 m = 0.00 + 1.00
= 26.00 x 0.89 = 23.09 Kg = 1.00 x 4.00
JUMLAH 3
JUMLAH 3 = 21.30 + 23.09 = 44.39 kg
Area m2 = 5, 6 & 7
= 0.10 + 0.00 + 0.00
= 0.10 x 4.00 = 0.40 m3
0.00 0.50 +
0.00 0.00
BACK UP DATA BILL OF QUANTITY (BOQ)
KEGIATAN : 0.00
PEKERJAAN : 0.00
LOKASI : 0.00
KONTRAKTOR PELAKSANA : 0.00
Tulangan pokok
= 0.70 m : 0.15 = 4.00 bh
6 = 0.30 x 0.70 = 0.21 m3 = 4.00 bh x 3.00 m = 11.99 m
= 11.99 x 0.89 = 10.65 Kg
Tulangan pembagi
= 3.00 m : 0.15 = 20.00 bh
= 20.00 bh x 0.70 = 14.00 m
= 14.00 x 0.89 = 12.43 Kg
JUMLAH 3
JUMLAH 3 = 10.65 + 12.43 = 23.08 kg
Area m2 = 5, 6 & 7
= 0.21 + 0.00 + 0.00
= 0.21 x 3.30 = 0.69 m3
KEGIATAN : 0.00
PEKERJAAN : 0.00
LOKASI : 0.00
KONTRAKTOR PELAKSANA : 0.00
Tulangan pokok
= 0.70 m : 0.15 = 4.00 bh
6 = 0.50 x 0.70 = 0.35 m3 = 4.00 bh x 7.00 m = 27.98 m
= 27.98 x 0.89 = 24.84 Kg
Tulangan pembagi
= 7.00 m : 0.15 = 46.00 bh
= 46.00 bh x 0.70 = 32.20 m
= 32.20 x 0.89 = 28.59 Kg
JUMLAH 3
JUMLAH 3 = 24.84 + 28.59 = 53.43 kg
Area m2 = 5, 6 & 7
= 0.35 + 0.00 + 0.00
= 0.35 x 7.00 = 2.45 m3
Disetujui 0.00 +
Pengawas Direksi #REF! 0.00
SUB KEG.REHABILITASI JARINGAN IRIGASI PERMUKAAN 0.00 x
Tulangan pokok
= 4.70 m : 0.15 = 31.00 bh
6 = 0.30 x 4.70 = 1.41 m3 = 31.00 bh x 4.20 m = 130.21 m
= 130.21 x 0.89 = 115.63 Kg
Tulangan pembagi
= 4.20 m : 0.15 = 28.00 bh
= 28.00 bh x 4.70 = 131.60 m
= 131.60 x 0.89 = 116.86 Kg
JUMLAH 3
JUMLAH 3 = 115.63 + 116.86 = 232.49 kg
Area m2 = 5, 6 & 7
= 1.41 + 0.00 + 0.00
= 1.41 x 4.20 = 5.92 m3
### m 0.50
6 = 0.50 + 0.90 A = 0.50 + 2.40 =
x 2.90 = 2.03 m2
2
Area m2 = 1+2
7 = 0.30 x 0.90 = 0.27 m2 = 2.90
JUMLAH A JUMLAH E
Area m2 = 5, 6 & 7 = 2.90 x 1.50 = ### m2
= 2.03 + 0.27
= 2.30 x 1.50 = 3.45 m3
1 2.90
0.25
0.25
C =
6 = 0.25 + 0.35
x 0.70 = 0.21 m2 1.20
0.25
0.25
x 0.70 = 0.21 m2
### m
1.20
2 C = 0.25 + 0.70 =
Area m2 = 5, 6 & 7
JUMLAH A = 1.90 x 2.50 = ### m2
1 2
= 0.21 + 0.21
= 0.42 x 2.50 = 1.05 m3
0.35
A. PEKERJAAN PASANGAN BATU
0.35
C = 0.25 + 0.80 = ### m
6 = 0.30 + 0.40
x 0.65 = 0.23 m2
2 Area m2 = 1+2
= 1.05
Area m2 = 5, 6 & 7 JUMLAH H
JUMLAH A = 0.23 + = 1.05 x 4.00 = ### m2
= 0.23 x 3.30 = 0.75 m3
= 6.50 m2
JUMLAH 4
= 1.26 m2
Dibuat Oleh,
ontraktor Pelaksana
. WUDI PERMATA
LUKMAN
Direktur
JUMLAH 8
= 4.00 m2
JUMLAH 9
= 4.20 m2
Dibuat Oleh,
ontraktor Pelaksana
. WUDI PERMATA
LUKMAN
Direktur
12
0.50
1
2.60
2 0.50
0.90
Dibuat Oleh,
ontraktor Pelaksana
. WUDI PERMATA
LUKMAN
Direktur
14
0.50
1 2.80
0.90
15
0.25
1.20
2 0.70
0.35
Dibuat Oleh,
ontraktor Pelaksana
. WUDI PERMATA
LUKMAN
Direktur
JUMLAH 4
= 4.00 m2
0.00
0.00
0.00
0.00
m
JUMLAH 4
= 4.00 m2
0.00
0.00
0.00
+
0.00
0.00
0.00
0.00
0.00
0.00
+
0.00
x
0.00
0.00
0.00
0.00
0.00
Dibuat Oleh,
ontraktor Pelaksana
0.25
0.25
2
0.35
Dibuat Oleh,
ontraktor Pelaksana
. WUDI PERMATA
LUKMAN
Direktur
BACK UP DATA BILL OF QUANTITY (BOQ)
0.75
0.15
0.15
0.60 K175
Ø10 - 18
Ø10 - 20
0.70
0.73
4 3
K40
2 Ø10 - 16
1
Disetujui Diperiksa Oleh, Dibuat Oleh,
Pengawas Direksi Konsultan Pengawas Kontraktor Pelaksan
SUB KEG.REHABILITASI JARINGAN IRIGASI PERMUKAAN PT. INDO PRATAMA SARI CV. WUDI PERMAT
0.75
0.15
Ø10 - 18
0.15
0.60 K175
Ø10 - 20
0.73
0.70
4 3
K40 Ø10 - 16
2
1
Disetujui Diperiksa Oleh, Dibuat Oleh,
Pengawas Direksi Konsultan Pengawas Kontraktor Pelaksan
SUB KEG.REHABILITASI JARINGAN IRIGASI PERMUKAAN PT. INDO PRATAMA SARI CV. WUDI PERMAT
JUMARI. SE SYAMSUDDIN LUKMAN
Inspector Direktur
0.75
0.15
0.15
0.60 K175
Ø10 - 18
Ø10 - 20
0.70
0.73
4 3
K40
Ø10 - 16
2
1
Disetujui Diperiksa Oleh, Dibuat Oleh,
Pengawas Direksi Konsultan Pengawas Kontraktor Pelaksan
SUB KEG.REHABILITASI JARINGAN IRIGASI PERMUKAAN PT. INDO PRATAMA SARI CV. WUDI PERMAT
JUMARI. SE SYAMSUDDIN LUKMAN
Inspector Direktur
0.75
0.15
0.15
0.73
0.70
4 3
K40 Ø10 - 16
2
1
Disetujui Diperiksa Oleh, Dibuat Oleh,
Pengawas Direksi Konsultan Pengawas Kontraktor Pelaksan
SUB KEG.REHABILITASI JARINGAN IRIGASI PERMUKAAN PT. INDO PRATAMA SARI CV. WUDI PERMAT
JUMARI. SE SYAMSUDDIN LUKMAN
Inspector Direktur
0.75
0.15
0.15
0.73
0.70
4 3
K40
Ø10 - 16
2
1
Disetujui Diperiksa Oleh, Dibuat Oleh,
Pengawas Direksi Konsultan Pengawas Kontraktor Pelaksan
SUB KEG.REHABILITASI JARINGAN IRIGASI PERMUKAAN PT. INDO PRATAMA SARI CV. WUDI PERMAT
0.75
Ø10 - 18
0.15
0.15
0.60 K175
Ø10 - 20
0.73
0.70
4 3
K40 Ø10 - 16
2
1
Disetujui Diperiksa Oleh, Dibuat Oleh,
Pengawas Direksi Konsultan Pengawas Kontraktor Pelaksan
SUB KEG.REHABILITASI JARINGAN IRIGASI PERMUKAAN PT. INDO PRATAMA SARI CV. WUDI PERMAT
JUMLAH 4
25 = 61.50 m2
Dibuat Oleh,
Kontraktor Pelaksana
V. WUDI PERMATA
LUKMAN
Direktur
JUMLAH 4
25 = 61.50 m2
Dibuat Oleh,
Kontraktor Pelaksana
V. WUDI PERMATA
LUKMAN
Direktur
JUMLAH 4
25 = 61.50 m2
Dibuat Oleh,
Kontraktor Pelaksana
V. WUDI PERMATA
LUKMAN
Direktur
JUMLAH 4
25 = 61.50 m2
Dibuat Oleh,
Kontraktor Pelaksana
V. WUDI PERMATA
LUKMAN
Direktur
JUMLAH 4
25 = 61.50 m2
Dibuat Oleh,
Kontraktor Pelaksana
V. WUDI PERMATA
LUKMAN
Direktur
JUMLAH 4
22 = 54.12 m2
Dibuat Oleh,
Kontraktor Pelaksana
V. WUDI PERMATA
LUKMAN
Direktur
BACK UP DATA BILL OF QUANTITY (BOQ)
Area m2 = 1
= 0.09
JUMLAH A
= 0.09 m2 x 50.00 = 4.50 m3
Area m2 = 1
= 0.09
JUMLAH A
= 0.09 m2 x 50.00 = 4.50 m3
Disetujui Diperiksa Oleh, Dibuat Oleh,
Pengawas Direksi Konsultan Pengawas Kontraktor Pelaksana
SUB KEG.REHABILITASI JARINGAN PT. INDO PRATAMA SARI CV. WUDI PERMATA
IRIGASI PERMUKAAN
Area m2 = 1
= 0.09
JUMLAH A
= 0.09 m2 x 50.00 = 4.50 m3
Area m2 = 1
= 0.09
JUMLAH A
= 0.09 m2 x 50.00 = 4.50 m3
Disetujui Diperiksa Oleh, Dibuat Oleh,
Pengawas Direksi Konsultan Pengawas Kontraktor Pelaksana
SUB KEG.REHABILITASI JARINGAN PT. INDO PRATAMA SARI CV. WUDI PERMATA
IRIGASI PERMUKAAN
Area m2 = 1
= 0.09
JUMLAH A
= 0.09 m2 x 57.50 = 5.18 m3
Area m2 = 1
= 0.09
JUMLAH A
= 0.09 m2 x 44.50 = 4.01 m3
Disetujui Diperiksa Oleh, Dibuat Oleh,
Pengawas Direksi Konsultan Pengawas Kontraktor Pelaksana
SUB KEG.REHABILITASI JARINGAN PT. INDO PRATAMA SARI CV. WUDI PERMATA
IRIGASI PERMUKAAN
1 = 0.25 + 0.40
x 0.50 = 0.16 m2
2.00
Area m2 = 1 + 2 + 3 + 4
= 0.16 + 0.08 + 0.45 + 0.11
JUMLAH B
= 0.80 m2 x 2.00 = 1.61 m3
Disetujui Diperiksa Oleh, Dibuat Oleh,
Pengawas Direksi Konsultan Pengawas Kontraktor Pelaksana
SUB KEG.REHABILITASI JARINGAN PT. INDO PRATAMA SARI CV. WUDI PERMATA
IRIGASI PERMUKAAN
JUMLAH A
= 3.37 m2 x 6.00 = 20.19 m3
0.20
0.20
0.20
0.20
0.50
0.15
0.15
0.35
0.35
0.35
0.35
0.60
Ø10 - 19
Ø10 - 20
1
0.73
2
3 4
15 - Ø10
0.75 5
10
11
12
0.50
0.20
0.40
0.55
1.05
12
0.50
0.20
0.40
0.55
1.05
Disetujui Diperiksa Oleh, Dibuat Oleh,
Pengawas Direksi Konsultan Pengawas Kontraktor Pelaksana
SUB KEG.REHABILITASI JARINGAN PT. INDO PRATAMA SARI CV. WUDI PERMATA
IRIGASI PERMUKAAN
Area m2 = 1
= 0.09
JUMLAH A
= 0.09 m2 x 9.30 = 0.84 m3
Area m2 = 1
= 0.09
JUMLAH A
= 0.09 m2 x 25.00 = 2.25 m3
Disetujui Diperiksa Oleh, Dibuat Oleh,
Pengawas Direksi Konsultan Pengawas Kontraktor Pelaksana
SUB KEG.REHABILITASI JARINGAN PT. INDO PRATAMA SARI CV. WUDI PERMATA
IRIGASI PERMUKAAN
2 = 0.25 + 0.35
x 0.70 = 0.21 m2
2.00
Area m2 = 1
= 0.21 + 0.07 + +
JUMLAH B
= 0.28 m2 x 4.50 = 1.26 m3
Area m2 = 1
= 0.09
JUMLAH A
= 0.09 m2 x 10.00 = 0.90 m3
Disetujui Diperiksa Oleh, Dibuat Oleh,
Pengawas Direksi Konsultan Pengawas Kontraktor Pelaksana
SUB KEG.REHABILITASI JARINGAN PT. INDO PRATAMA SARI CV. WUDI PERMATA
IRIGASI PERMUKAAN
1 = 0.25 + 0.35
x 0.70 = 0.21 m2
2.00
Area m2 = 1
= 0.21 + 0.07 + +
JUMLAH B
= 0.28 m2 x 2.00 = 0.56 m3
Area m2 = 1
= 0.09
JUMLAH A
= 0.09 m2 x 61.00 = 5.49 m3
Disetujui Diperiksa Oleh, Dibuat Oleh,
Pengawas Direksi Konsultan Pengawas Kontraktor Pelaksana
SUB KEG.REHABILITASI JARINGAN PT. INDO PRATAMA SARI CV. WUDI PERMATA
IRIGASI PERMUKAAN
Area m2 = 1 Area m2 = 2
= 0.09 = 0.80
JUMLAH A JUMLAH C
= 0.09 m2 x 8.00 = 0.72 m3 = 0.80 x 8.00 = 6.40 m2
2 = 0.25 + 0.35
x 0.70 = 0.21 m2
2.00
Area m2 = 2 & 3
= 0.21 + 0.07 + +
JUMLAH B
= 0.28 m2 x 8.00 = 2.24 m3
Area m2 = 1
= 0.09
JUMLAH A
= 0.09 m2 x 50.00 = 4.50 m3
Disetujui Diperiksa Oleh, Dibuat Oleh,
Pengawas Direksi Konsultan Pengawas Kontraktor Pelaksana
SUB KEG.REHABILITASI JARINGAN PT. INDO PRATAMA SARI CV. WUDI PERMATA
IRIGASI PERMUKAAN
Area m2 = 1
= 0.09
JUMLAH A
= 0.09 m2 x 50.00 = 4.50 m3
Area m2 = 1
= 0.09
JUMLAH A
= 0.09 m2 x 44.00 = 3.96 m3
Disetujui Diperiksa Oleh, Dibuat Oleh,
Pengawas Direksi Konsultan Pengawas Kontraktor Pelaksana
SUB KEG.REHABILITASI JARINGAN PT. INDO PRATAMA SARI CV. WUDI PERMATA
IRIGASI PERMUKAAN
2 = 0.30 + 0.50
x 1.00 = 0.40 m2
2.00
Area m2 = 1
= 0.40 + 0.10 + +
JUMLAH B
= 0.50 m2 x 8.00 = 4.00 m3
2 = 0.25 + 0.35
x 0.70 = 0.21 m2
2.00
Area m2 = 1
= 0.21 + 0.07 + +
JUMLAH B
= 0.28 m2 x 20.00 = 5.60 m3
Disetujui Diperiksa Oleh, Dibuat Oleh,
Pengawas Direksi Konsultan Pengawas Kontraktor Pelaksana
SUB KEG.REHABILITASI JARINGAN PT. INDO PRATAMA SARI CV. WUDI PERMATA
IRIGASI PERMUKAAN
Area m2 = 1
= 0.09
JUMLAH A
= 0.09 m2 x 50.00 = 4.50 m3
Area m2 = 1
= 0.09
JUMLAH A
= 0.09 m2 x 30.00 = 2.70 m3
Disetujui Diperiksa Oleh, Dibuat Oleh,
Pengawas Direksi Konsultan Pengawas Kontraktor Pelaksana
SUB KEG.REHABILITASI JARINGAN PT. INDO PRATAMA SARI CV. WUDI PERMATA
IRIGASI PERMUKAAN
Area m2 = 1
= 0.09
JUMLAH A
= 0.09 m2 x 25.00 = 2.21 m3
Area m2 = 1
= 0.09
JUMLAH A
= 0.09 m2 x 25.00 = 2.21 m3
Disetujui Diperiksa Oleh, Dibuat Oleh,
Pengawas Direksi Konsultan Pengawas Kontraktor Pelaksana
SUB KEG.REHABILITASI JARINGAN PT. INDO PRATAMA SARI CV. WUDI PERMATA
IRIGASI PERMUKAAN
Area m2 = 1
= 0.06
JUMLAH A
= 0.06 m2 x 10.00 = 0.60 m3
Area m2 = 1 Area m2 = 2
= 0.06 = 0.70
JUMLAH A JUMLAH C
= 0.06 m2 x 14.00 = 0.78 m3 = 0.70 x 14.00 = 9.80 m2
Area m2 = 2 + 3
= 0.18 + 0.07
JUMLAH B
= 0.25 m2 x 14.00 = 3.50 m3
Disetujui Diperiksa Oleh, Dibuat Oleh,
Pengawas Direksi Konsultan Pengawas Kontraktor Pelaksana
SUB KEG.REHABILITASI JARINGAN PT. INDO PRATAMA SARI CV. WUDI PERMATA
IRIGASI PERMUKAAN
Area m2 = 1
= 0.07
JUMLAH A
= 0.07 m2 x 11.00 = 0.74 m3
Area m2 = 1 + 2
= 0.04 + 0.04
JUMLAH B
= 0.08 m2 x 4.50 = 0.34 m3
Disetujui Diperiksa Oleh, Dibuat Oleh,
Pengawas Direksi Konsultan Pengawas Kontraktor Pelaksana
SUB KEG.REHABILITASI JARINGAN PT. INDO PRATAMA SARI CV. WUDI PERMATA
IRIGASI PERMUKAAN
0.25
0.25
0.40
1 2
0.35
0.25
0.40
P.8 REHABILITASI SALURAN 25.00 M
A. PEKERJAAN PASANGAN BATU B. PLESTERAN
0.25
0.40
1 2
3
0.35
0.25
0.40
1 2
0.35
0.25
0.40
0.25
0.25
0.40
1 2
3
0.35
0.25
0.40
0.25
0.40
1 2
3
0.35
0.25
0.40
3
0.35
0.25
0.40
0.25
0.25
0.40
0.50 1 0.70
0.20 2 3
0.35 4 0.20
0.35
0.40
P.12 REHABILITASI SALURAN 5.50 M
A. PEKERJAAN PASANGAN BATU B. PLESTERAN
0.25
0.40
1 2
3
0.35
0.25
0.40
3
0.35
0.25
0.40
0.25
0.25
0.40
1
3
2
0.35
0.35
0.40
0.25
0.40
1 2
3
0.35
0.25
0.40
3
0.35
0.25
0.40
0.25
0.25
0.40
1 2
0.35 3
0.25
0.40
P.17 REHABILITASI SALURAN 3.30 M
A. PEKERJAAN PASANGAN BATU B. PLESTERAN
0.25
0.40
0.50 1 0.70
0.20 2 3
4 0.20
0.35
0.35
0.40
0.50 1 0.70
0.20 2 3
4 0.20
0.35
0.35
0.40
0.25
0.25
0.40
1 2
3
0.35
0.25
0.40
0.25
0.40
1
3
2
4
0.35
0.35
0.40
3
2
0.35
0.35
0.40
0.25
0.25
0.40
1 2
3
0.35
0.25
0.40
0.25
0.40
1
3
2
4
0.35
0.35
0.40
3
2
0.35
0.35
0.40
0.25
0.25
0.40
1 2
3
0.35
0.25
0.40
0.25
0.40
1
3
2
4
0.35
0.35
0.40
2
0.35
0.35
0.40
0.25
0.25
0.40
0.50 1 0.70
0.20 2 3
4 0.20
0.35
0.35
0.40
0.25
0.40
1 2
3
0.35
0.25
0.40
1 2
0.35
0.25
0.40
0.25
0.25
0.40
1
3
2
0.35
0.35
0.40
0.25
0.40
1 2
3
0.35
0.25
0.40
1 2
0.35
0.25
0.40
Disetujui Diperiksa Oleh, Dibuat Oleh,
Pengawas Direksi Konsultan Pengawas Kontraktor Pelaksana
SUB KEG.REHABILITASI JARINGAN PT. INDO PRATAMA SARI CV. WUDI PERMATA
IRIGASI PERMUKAAN
0.25
0.25
0.40
0.50 1 0.70
0.20 2 3
4 0.20
0.35
0.35
0.40
0.25
0.40
1 2
3
0.35
0.25
0.40
1 2
0.35
0.25
0.40
0.25
0.25
0.40
1 2
3
0.35
0.25
0.40
Disetujui Diperiksa Oleh, Dibuat Oleh,
Pengawas Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. INDO PRATAMA SARI CV. WUDI PERMATA
0.00
I. PEKERJAAN PERSIAPAN
1 Papan Nama Pekerjaan 0.70 m2 0.70 m2
2 Penyelengaraan Sistem Manajemen Keselamatan Dan Kesehatan Kerja (SMK3) 1.00 set 1.00 set
1 Pengadaan dan Pemasangan Pintu Air Penguras 1.00 Buah 1.00 Buah
2 Pengadaan dan Pemasangan Mistar Ukur Bendung 1.00 Buah 1.00 Buah
3 Pengadaan dan Pemasangan Mistar Ukur Pengambilan 1.00 Buah 1.00 Buah
4 Pengadaan dan Pemasangan Papan operasi 1.00 Buah 1.00 Buah
5 Galian Tanah Biasa 15.00 m3 85.52 m3
6 Bongkaran Pasangan Batu 35.00 m3 35.00 m3
7 Pekerjaan Pasangan Batu 256.87 m3 229.42 m3
8 Plesteran 814.54 M2 760.23 M2
9 Lansiran Titik I 190.00 m3 326.00 m3
10 Lansiran Titik II 140.00 m3 88.00 m
11 Beton Mutu K-40 s.d k60 7.40 m3 9.22 Buah
12 Beton Mutu K-175 145.64 m3 146.99 m3
13 Pembesian 3,705.48 m3 3,632.76
14 Bekisting 405.25 m2 446.00
0.15
0.15
Ø10 - 18
Ø10 - 20 4 3
2
Ø10 - 18 K
1
Disetujui Diperiksa Oleh, Dibuat Oleh,
Pengawas Direksi Konsultan Pengawas Kontraktor Pelaksana
SUB KEG.REHABILITASI JARINGAN IRIGASI PERMUKAAN PT. INDO PRATAMA SARI CV. WUDI PERMATA
LAH 4
= 52.16 m2
55
40 K175
0.15
3
2
K40
1
uat Oleh,
or Pelaksana
DI PERMATA
KMAN
rektur
BACK UP DATA BILL OF QUANTITY (BOQ)
0.75
0.15
0.15
0.60 K175
Ø10 - 18
Ø10 - 20
0.70
4 3
0.73
K40
2 Ø10 - 16
1
Disetujui Diperiksa Oleh, Dibuat Oleh,
Pengawas Direksi Konsultan Pengawas Kontraktor Pelaksana
SUB KEG.REHABILITASI JARINGAN IRIGASI PERMUKAAN PT. INDO PRATAMA SARI CV. WUDI PERMATA
JUMLAH 4
6 = 13.86 m2
Dibuat Oleh,
Kontraktor Pelaksana
CV. WUDI PERMATA
LUKMAN
Direktur
BACK UP DATA BILL OF QUANTITY (BOQ)
1 Tulangan pokok
1 = 0.10 x 1.00 = 0.10 m2 = 1.00 m : 0.15 = 6.60 bh 1 = 0.60 +
Area m2 = Err:522 m2 = 6.60 bh x 3.00 m = 19.79 m = 0.80 m
= 19.79 x 0.617 = 12.21 Kg JUMLAH 3
JUMLAH 1 Tulangan pembagi = = 0.80 x
= 0.10 m2 x 3.00 = 0.30 m3 = 3.00 m : 0.15 = 20.00 bh
= 20.00 bh x 1.04 = 20.80 m
= 20.80 x 0.617 = 12.83 Kg
JUMLAH 2
= 12.21 + 12.83 = 25.04 kg
JUMLAH 3
3 = 2.40 m2
Dibuat Oleh,
Kontraktor Pelaksana
CV. WUDI PERMATA
LUKMAN
Direktur
NO. URAIAN PERHITUNGAN
P.0 A. PEKERJAAN BETON K175 25.00 M 3. PEKERJAAN PEMBESIAN 4. PEKERJAAN BEKISTING
1. LANTAI KERJA
Tulangan pokok
1 = 0.10 x 0.00 = 0.00 m2 = 0.90 m : 0.15 = 6.00 bh 1 ,2,3&4 = 0.00 + 0.00 + 0.10
Area m2 = 0.00 m2 = 6.00 bh x 25.00 m = 150.00 m = 0.10 m
JUMLAH 1 = 150.00 x 0.617 = 92.55 Kg JUMLAH 4
= 0.00 m2 x 25 = 0.00 m3 Tulangan pembagi = = 0.10 x 25 = 2.50
= 25.00 m : 0.15 = 166.00 bh
= 166.00 bh x 0.94 = 156.04 m
= 156.04 x 0.617 = 96.27 Kg
JUMLAH 3
= 92.55 + 96.27 = 188.82 kg
m2