S.G.18 Pembesian kolom, balok, ring balk dan sloof untuk besi beton ⌀ ≤ 12mm
Bahan/ Peralatan
1.05000 kg Besi Beton Polos 11,407 #VALUE! #VALUE!
0.02800 kg Kawat Beton 21,372 #VALUE! #VALUE!
Tenaga Kerja
0.00160 MD Mandor 188,473 #VALUE! #VALUE!
0.00160 MD Kepala Tukang Batu 177,221 #VALUE! #VALUE!
0.01600 MD Tukang Besi I (konstruksi) 161,749 #VALUE! #VALUE!
0.01600 MD Pekerja 140,651 #VALUE! #VALUE!
Biaya /Kg 12,576 5,424
SNI 7394:2008 S.G.5 Beton cor f'c = 14,5 Mpa, K 175, Slump 12 + 2 cm, w/c 0,66
Bahan/ Peralatan
326.00000 kg Portland Cement 1,656 #VALUE!
0.54286 m³ Pasir Beton 248,687 #VALUE!
0.76222 m³ Batu Koral/ Kerikil/ Bat 374,002 #VALUE!
0.21500 m³ Air tawar 26,423 #VALUE!
Tenaga Kerja
0.08300 MD Mandor 188,473 #VALUE!
0.02800 MD Kepala Tukang Batu 177,221 #VALUE!
0.27500 MD Tukang Batu 161,749 #VALUE!
1.65000 MD Pekerja 140,651 #VALUE!
Biaya / m³ ( m kubik) 965,708
#VALUE!
#VALUE!
#VALUE!
#VALUE!
297,161
RENCANA ANGGARAN BIAYA
( RAB )
Pekerjaan : Pekerjaan Pemindahan Pipa & Pembuatan Jalan
Lokasi : Fuel Teminal Banggai
Tahun : 2024
HARGA SATUAN
NO VOL SAT
JASA
A PEKERJAAN PERSIAPAN
1 Mobilisasi Pekerja 1 Ls 1,000,000.00
2 Mobilisasi Peralatan 1 Ls 1,000,000.00
3 Direksi Keet 1 Ls 1,000,000.00
4 Perlengkapan K3 Safety 7 Ls
5 Drawing Engginer , Desain Interior & Managament Proye 1 Ls 3,000,000.00
SUB TOTAL A
B PEKERJAAN PONDASI TALUD
1 Pek. Bwoiplank 31 m1 26,909.88
2 Pek. Anstamping 6.08 m3 163,800.00
3 Pek. Galian Tanah 64.75 m3 110,200.21
4 Pek. Susunan Pondasi Talud 1 : 4 31.2 m3 359,715.43
5 Pek. Plesteran Kasar Pondasi Talud 64 m2 16,303.78
SUB TOTAL B
C PEKERJAAN JALAN , BOX COVER & PEMBONGKARAN PONDASI
1 Pek. Box Cover
a Pengecoran K175 1.17 m3 297,160.81
b Pembesian B 10 34.5 kg 5,423.51
c Bakesting 12 m2 119,215.95
2 Pek. Pengecoran Jalan
a Pek. GO tanah 30.6 m3 115,000.00
b Pek. Timbunan Jalan 40.8 m3 33,750.00
c Pek. Pemadatan Jalan Menggunakan Stamper 40.8 m3 63,101.94
d Pek. Pembesian 8 1069 kg 5,423.51
e Pek. Pengecoran K175 40.8 m3 297,160.81
f Pek. Bakesting 41.7 m2 119,215.95
g Pek. Vibrator 1 Ls 3,500,000.00
H Pek. Pembongkaran Pondasi 1 Ls 2,000,000.00
SUB TOTAL C
D PEKERJAAN PEMINDAHAN PIPA & PENGADAAN PIPA
BIAYA
1,000,000.00
1,000,000.00
2,000,000.00 1,000,000.00 2,000,000.00
295,000.00 2,065,000.00
3,000,000.00
SUB TOTAL A 6,000,000.00 4,065,000.00
3,519,000.00
240,000.00 1,377,000.00 9,792,000.00
2,574,559.15
12,575.75 5,797,732.21 13,443,472.57
965,707.95 12,124,161.00 39,400,884.37
134,514.55 4,971,305.18 5,609,256.54
3,500,000.00
2,000,000.00
SUB TOTAL C 37,829,138.21 71,423,529.56 171,248,252.92