A. PEKERJAAN SUMUR BOR DALAM + RESERVOIR + JARINGAN DISTRIBUSI 4.504.647.232,70


B. PEKERJAAN SEPTICK KOMUNAL/INDIVIDUAN 7.207.589.660,83
C. PEKERJAAN TEMPAT PEMBUANGAN SAMPAH 1.802.351.391,25
D. REHAB RUMAH TIDAK LAYAK HUNI 9.013.252.954,60
E. PEKERJAAN JALAN LINGKUNGAN/PENDESTRIAN DAN SALURAN TERTUTUP 16.216.295.000,00
F. PEKERJAAN PEMASANGAN LAMPU SOLAR SELL 1.801.000.000,00

(A) Jumlah Harga Pekerjaan ( Termasuk Biaya Umum dan Keuntungan ) 40.545.136.239,00
(B) Pajak Pertambahan Nilai (PPN) = 11% x (A) 4.459.964.986,29
(C) JUMLAH TOTAL HARGA PEKERJAAN = (A) + (B) 45.000.000.000,00
Terbilang : Empat Puluh Lima Miliyar Rupiah,-

KONSULTAN PERENCANA :
CV. BROTHER ENGINEERS

Diperiksa Oleh : Dihitung Oleh :


Team Leader Estimator

ALI AL SHAKHI, ST SANOVAL, ST

Diketahui Oleh :

ASROL, ST. MT
Direktur
RINCIAN KUANTITAS PEKERJAAN
PEKERJAAN : PERENCANAAN INSFRASTRUKTUR DASAR DAN PERUMAHAN PERMUKIMAN SKALA KAWASAN ( HAGU, KP. JAWA DAN PUSONG )
LOKASI : KOTA LHOKSEUMAWE
TAHUN : 2022

HARGA SATUAN Analisa JUMLAH HARGA


NO. URAIAN PEKERJAAN SAT VOLUME

( Rp. ) ( Rp. )

PEKERJAAN SUMUR BOR DALAM + RESERVOIR +


A.
JARINGAN DISTRIBUSI
I. PEKERJAAN PERSIAPAN
1 Dokumentasi kontrak Ls 2.085.714,29 Taksir 1,00 2.085.714,29
2 Dokumentasi Proyek / Administrasi Ls 3.000.000,00 Taksir 1,00 3.000.000,00
3 Pemasangan Bownplank Ls 2.548.000,00 Taksir 1,00 2.548.000,00
4 Papan nama proyek Ls 300.000,00 Taksir 1,00 300.000,00
SUB JUMLAH 7.933.714,29
II. PEKERJAAN PENGEBORAN
BAHAN
1 Pipa Cassing PVC Dia 4" (Type AW) M' 106.811,00 AHSP PU A.4.5.1.20d 135,00 14.419.485,00
2 Pipa Hisap PVC Dia 1" (Insar AW) M' 51.131,00 AHSP PU A.4.5.1.20a 135,00 6.902.685,00
3 Pipa PVC Dia. 3/4" Distribusi ( Insar AW) M' 48.731,00 AHSP PU A.4.5.1.20 15,00 730.965,00
4 Pengadaan Accessories Pipa Ls 1.359.350,00 LAMPIRAN BOQ 1,00 1.359.350,00
5 Kerikil Bersih M3 331.500,00 Taksir 2,00 663.000,00
6 Pompa Jet Pump 1.4 Liter/detik + Accessoris Unit 10.000.000,00 Taksir 1,00 10.000.000,00
7 Pipa HDPE Dia. 200 mm M' 330.972,00 A.8.4.1.21 1.300,00 430.263.600,00
8 Pipa HDPE Dia. 150 mm M' 171.794,00 A.8.4.1.20 300,00 51.538.200,00
9 Pipa HDPE Dia. 63 mm M' 115.469,00 A.8.4.1.17 238,90 27.585.544,10

UPAH
1 Biaya Pengeboran M' 325.000,00 Taksir 135,00 43.875.000,00
2 Biaya Cuci Sumur Unit 1.500.000,00 Taksir 1,00 1.500.000,00

SUB JUMLAH 588.837.829,10


III. PEKERJAAN RUMAH POMPA DAN TEMPAT CUCI
1 Galian Tanah Pondasi M3 103.200,00 AHSP PU A.2.3.1.1 1,62 167.184,00
2 Urugan Kembali Bekas Galian M3 34.400,00 AHSP PU A.2.3.1.9a 0,54 18.576,00
3 Pasir Urug dibawah Lantai M3 245.640,00 AHSP PU A.2.3.1.11 0,20 49.128,00
4 Beton Cor K-100 M3 1.153.807,00 AHSP PU A.4.1.1.1 0,85 980.735,95
5 Pas. Bata 1 : 2 M2 160.030,00 AHSP PU A.4.4.1.7 6,60 1.056.198,00
6 Plesteran Bata 1 : 2 M2 85.252,00 AHSP PU A.4.4.2.2 13,20 1.125.326,40
7 Pengaman Pompa Teralis Besi Beratap Plat + Pengecatan ( siap Pasang)
Unit 1.500.000,00 Taksir 1,00 1.500.000,00
SUB JUMLAH 4.897.148,35
IV. PEKERJAAN TOWER & TANGKI POLYTANK
1 Galian Tanah M3 103.200,00 AHSP PU A.2.3.1.1 3,60 371.520,00
2 Urugan Kembali Bekas Galian M3 34.400,00 AHSP PU A.2.3.1.9a 1,20 41.280,00
3 Aanstamping M3 638.153,00 AHSP PU A.3.2.1.9 0,40 255.261,20
4 Urugan Pasir Dibawah Pondasi M3 245.640,00 AHSP PU A.2.3.1.11 0,20 49.128,00
5 Beton Cor K-225 M3 1.360.477,00 AHSP PU A.4.1.1.7 5,67 7.716.625,54
6 Pembesia 1 Kg Dengan Besi Beton Polos Kg 19.372,00 AHSP PU A.4.1.1.17a 1.039,21 20.131.625,83
7 Bekisting Pondasi 3 x Pakai M2 133.794,00 AHSP PU A.4.1.1.20 1,20 160.552,80
8 Bekisting Sloof 3 x Pakai M2 145.151,00 AHSP PU A.4.1.1.21 1,80 261.271,80
9 Bekisting Kolom 3 x Pakai M2 233.477,00 AHSP PU A.4.1.1.22 17,07 3.984.674,13
10 Bekisting Balok 3 x Pakai M2 244.222,00 AHSP PU A.4.1.1.23 3,31 808.863,26
11 Bekisting Plat Lantai 3 x Pakai M2 255.344,00 AHSP PU A.4.1.1.24 1,07 272.366,93
12 Teralis Pengaman Polytank + Cat (Terpasang) Unit 2.700.000,00 Taksir 1,00 2.700.000,00
13 Tangga Tower + Cat ( Terpasang) Unit 1.500.000,00 Taksir 1,00 1.500.000,00
14 Pipa PVC Dia. 1" Dari Pompa Ke Tower ( Insar AW) M1 51.131,00 AHSP PU A.4.5.1.20a 6,00 306.786,00
15 Pipa PVC dia. 3/4" Distribusi ( Insar AW) M1 48.731,00 AHSP PU A.4.5.1.20 6,00 292.386,00
16 Tangki Air Polytank Kapasitas 2000 Liter Unit 3.000.000,00 Taksir 1,00 3.000.000,00
SUB JUMLAH 41.852.341,51
JUMLAH TOTAL 1 UNIT 643.521.033,24
JUMLAH TOTAL 7 UNIT 4.504.647.232,70
B. PEKERJAAN SEPTICK KOMUNAL/INDIVIDUAN
I. PEKERJAAN PERSIAPAN
1 Papan Nama Proyek Ls 250.000,00 Taksir 1,00 250.000,00
2 Pemasangan Bouwplank/Pematokan Ls 500.000,00 Taksir 1,00 500.000,00
3 Administrasi dan Dokumentasi Proyek Ls 1.000.000,00 Taksir 1,00 1.000.000,00
4 Biaya Penyelenggaraan SMK3 Dihitung 1.000.000,00 Taksir 1,00 1.000.000,00
SUB TOTAL 2.750.000,00
II. PEKERJAAN TANAH
1 Galian M3 103.202,50 A.2.3.1.1 11,40 1.176.508,50
2 Urugan Pasir M3 12.000,00 Taksir 0,38 4.560,00
3 Lantai Kerja Pondasi Beton K - 175 M3 1.059.843,75 A.4.1.1.4 0,76 805.481,25
SUB TOTAL 1.986.549,75
III. PEKERJAAN BETON DAN BETON BERTULANG
1 Pekerjaan Beton Praktis 13 x 13 cm
Beton K-K225 M3 1.370.161,01 A.4.1.1.7 0,10 138.934,33
Besi Beton Polos KG 19.785,83 A.4.1.1.17.a 24,56 485.966,89
Bekisting M2 238.861,39 A.4.1.1.22 1,56 372.623,77
2 Pekerjaan Beton Plat Lantai, T = 10 Cm
Beton K-K225 M3 1.370.161,01 A.4.1.1.7 0,76 1.041.322,37
Besi Beton Polos KG 19.785,83 A.4.1.1.17.a 61,28 1.212.477,64
Bekisting M2 249.797,72 A.4.1.1.23 7,60 1.898.462,70
SUB TOTAL 5.149.787,70
IV. PEKERJAAN PASANGAN & PLESTERAN
1 Pasangan batu bata 1 : 2 M2 162.593,47 A.4.4.1.7 20,40 3.316.906,75
2 Plesteran 1 : 2 M2 93.829,17 A.4.4.2.2 40,80 3.828.229,96

SUB TOTAL 7.145.136,70


V PEKERJAAN SANITAIR
1 Inst. Air Kotor Cair (Pipa PVC 2" Terpasang) Ls 987.500,00 Taksir 1,00 987.500,00
SUB TOTAL 987.500,00
JUMLAH TOTAL 1 UNIT 18.018.974,15
JUMLAH TOTAL 400 UNIT 7.207.589.660,83
HARGA SATUAN Analisa JUMLAH HARGA
NO. URAIAN PEKERJAAN SAT VOLUME

( Rp. ) ( Rp. )
C. PEKERJAAN TEMPAT PEMBUANGAN SAMPAH
I. PEKERJAAN PERSIAPAN
1 Papan Nama Proyek Ls 250.000,00 Taksir 1,00 250.000,00
2 Pemasangan Bouwplank/Pematokan Ls 500.000,00 Taksir 1,00 500.000,00
3 Administrasi dan Dokumentasi Proyek Ls 1.000.000,00 Taksir 1,00 1.000.000,00
4 Biaya Penyelenggaraan SMK3 Dihitung 1.000.000,00 Taksir 1,00 1.000.000,00
SUB TOTAL 2.750.000,00
II. PEKERJAAN TANAH
1 Galian M3 103.202,50 A.2.3.1.1 50,80 5.242.687,00
2 Urugan Pasir M3 12.000,00 Taksir 1,27 15.240,00
3 Lantai Kerja Pondasi Beton K - 175 M3 1.059.843,75 A.4.1.1.4 2,54 2.692.003,12
SUB TOTAL 7.949.930,12
III. PEKERJAAN BETON DAN BETON BERTULANG
1 Pekerjaan Beton Praktis 13 x 13 cm
Beton K-K225 M3 1.370.161,01 A.4.1.1.7 0,25 347.335,82
Besi Beton Polos KG 19.785,83 A.4.1.1.17.a 61,40 1.214.917,23
Bekisting M2 238.861,39 A.4.1.1.22 3,90 931.559,42
2 Pekerjaan Beton Plat Lantai, T = 10 Cm
Beton K-K225 M3 1.370.161,01 A.4.1.1.7 2,54 3.480.208,97
Besi Beton Polos KG 19.785,83 A.4.1.1.17.a 205,36 4.063.141,87
Bekisting M2 249.797,72 A.4.1.1.23 25,40 6.344.862,19
SUB TOTAL 16.382.025,50
IV. PEKERJAAN PASANGAN & PLESTERAN
1 Pasangan batu bata 1 : 2 M2 162.593,47 A.4.4.1.7 37,05 6.024.087,99
2 Plesteran 1 : 2 M2 93.829,17 A.4.4.2.2 74,10 6.952.741,17

SUB TOTAL 12.976.829,16


V PEKERJAAN PLAT BESI PENUTUP
1 Penutup Besi Plat Ls 5.000.000,00 Taksir 1,00 5.000.000,00
SUB TOTAL 5.000.000,00
JUMLAH TOTAL 1 UNIT 45.058.784,78
jUMLAH TOTAL 40 UNIT 1.802.351.391,25

D. REHAB RUMAH TIDAK LAYAK HUNI


I. PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan Ls 150.000,00 Taksir 1,00 150.000,00
2 Pengukuran dan Pemasangan Bowplank Ls 200.000,00 Taksir 1,00 200.000,00
3 Batu Prasasti Ls 200.000,00 Taksir 1,00 200.000,00
4 Administrasi / Dokumentasi Ls 100.000,00 Taksir 1,00 100.000,00
5 Papan Nama Proyek Ls 150.000,00 Taksir 1,00 150.000,00
SUB TOTAL 800.000,00
II. PEKERJAAN PASANGAN DAN PLESTERAN
1 Pasangan Batu Bata 1 : 4 M² 116.400,00 A.4.4.1.9. 95,76 11.146.263,79
SUB TOTAL 11.146.263,79
III. PEKERJAAN LANTAI
1 Lantai Keramik Uk. 40 x 40 cm M² 167.056,80 A.4.4.3.4 b 32,77 5.474.451,34
SUB TOTAL 5.474.451,34
IV. PEKERJAAN ATAP, LISTPLANK DAN PLAFOND
1 Rangka Kuda-kuda Baja Ringan Galvanized C-75/60 + Atap Seng Metal M²0,3 mm dan Rabung
180.000,00
0,3 mm (Terpasang)
Taksir 58,00 10.440.000,00
2 Listplank Papan M' 70.000,00 Taksir 35,20 2.464.000,00
3 Plafond PVC Dengan Rangka Plafond Furing Lengkap Terpasang M² 170.000,00 Taksir 21,19 3.602.300,00
SUB TOTAL 16.506.300,00
V. PEKERJAAN KOSEN PINTU, JENDELA DAN KUNCI
1 Daun Pintu Panel Luar, Terpasang Bh 850.000,00 Taksir 1,00 850.000,00
2 Pintu Kamar Mandi PVC (Lengkap), Terpasang Bh 450.000,00 Taksir 1,00 450.000,00
3 Daun Jendela Kaca Type J1, Terpasang Bh 300.000,00 Taksir 2,00 600.000,00
4 Daun Jendela Kaca Type J2, Terpasang Bh 300.000,00 Taksir 2,00 600.000,00
5 Engsel Pintu, Terpasang Bh 30.000,00 Taksir 4,00 120.000,00
6 Engsel Jendela, Terpasang Bh 20.000,00 Taksir 5,00 100.000,00
7 Hak Angin, Terpasang Bh 10.400,00 Taksir 5,00 52.000,00
8 Kunci Pintu 2 Slaag, Terpasang Bh 160.000,00 Taksir 2,00 320.000,00
9 Grendel Jendela, Terpasang Bh 10.400,00 Taksir 5,00 52.000,00
SUB TOTAL 3.144.000,00
VI. PEKERJAAN PENGECATAN
1 Cat Mengkilat Kusen + Daun Pintu dan Daun Jendela M² 40.015,00 A.4.7.1.4 23,16 926.747,40
2 Cat Dinding Luar dan Dalam M² 20.253,00 A.4.6.2.20 178,67 3.618.502,25
SUB TOTAL 4.545.249,65
VII. PEKERJAAN INSTALASI LISTRIK
1 Box Zakering , Terpasang Bh 120.000,00 Taksir 1,00 120.000,00
2 Lampu SL 18 Watt + Fifting, Terpasang Bh 40.000,00 Taksir 6,00 240.000,00
3 Stop Kontak + Instalasi, Terpasang Bh 105.000,00 Taksir 4,00 420.000,00
4 Saklar Ganda, Terpasang Bh 25.000,00 Taksir 2,00 50.000,00
5 Saklar Tunggal, Terpasang Bh 20.000,00 Taksir 2,00 40.000,00
6 Instalasi Titik Api + Kabel + Pipa Sparing (Terpasang) Titik 112.500,00 Taksir 6,00 675.000,00
SUB TOTAL 1.545.000,00
VIII. PEKERJAAN SANITAIR
1 Kloset Jongkok Keramik, Terpasang Bh 260.000,00 Taksir 1,00 260.000,00
2 Floor Drain, Terpasang Bh 20.000,00 Taksir 1,00 20.000,00
3 Kran Air 3/4 Inc terpasang Bh 20.000,00 Taksir 1,00 20.000,00
4 Pipa PVC 3/4 Inci + aksesoris, Terpasang M 15.000,00 Taksir 7,00 105.000,00
5 Pipa Instalasi Air Kotor 3 Inci Type AW+ Aksesoris M 40.000,00 Taksir 5,00 200.000,00
6 Septictank Cincin Sumur + Penutup + Instalasi Pipa PVC 4 inci Type AW
Ls + Aksesoris1.300.000,00
(Terpasang) Taksir 1,00 1.300.000,00
SUB TOTAL 1.905.000,00
JUMLAH TOTAL 1 UNIT 45.066.264,77
JUMLAH TOTAL 200 UNIT 9.013.252.954,60
HARGA SATUAN Analisa JUMLAH HARGA
NO. URAIAN PEKERJAAN SAT VOLUME

( Rp. ) ( Rp. )
E. PEKERJAAN JALAN LINGKUNGAN/PENDESTRIAN DAN SALURAN TERTUTUP
I. PEKERJAAN PERSIAPAN
1 Penyelenggaraan Keamanan dan Kesehatan Kerja serta Ls 82.400.000,00 Taksir A.1 1,00 82.400.000,00
2 Keselamatan Kerja dan Demobilisasi
Pekerjaan Mobilisasi Ls 36.900.000,00 Taksir B.1 1,00 36.900.000,00
3 Pengadaan dan Pemasangan Papan Nama Proyek Unit 500.000,00 Taksir B.2 1,00 500.000,00
Jumlah Harga Pekerjaan Persiapan 119.800.000,00

II. PEKERJAAN JALAN JAWA - PUSONG


1 Pekerjaan Timbunan Tanah M3 90.838,00 Analisa EI-3.2.(1) 24.181,25 2.196.576.387,50
2 Geotekstil Separator (Non Woven) M2 61.000,00 Taksir C.6 16.907,00 1.031.327.000,00
3 Lantai Kerja (Beton mutu rendah fc’= 10 Mpa / Mutu K-100) M3 1.013.756,00 Analisa EI-7.1.(10) 683,49 692.892.088,44
4 Pekerjaan Beton Tangga (Beton mutu rendah fc’= 15 Mpa / M3 1.285.127,00 Analisa EI-7.1.(8) 477,92 614.187.895,84
Mutu K-175)
5 Pekerjaan Lantai Beton (Beton mutu sedang fc’= 20 Mpa / Mutu M3 1.399.361,00 Analisa EI-7.1.(7a) 2.050,47 2.869.347.749,67
K-225)
6 Pekerjaan Baja Tulangan U 24 Polos Kg 15.157,00 Analisa EI-7.3.(1) 98.096,17 1.486.843.648,69
7 Pekerjaan Guiding Block 30 x 30 (Jalur Disabilitas) M2 401.645,00 A.4.4.3.10.a 515,70 207.128.326,50
8 Lampu BRP710 LED30 CW MR S1 12V LFP AIO Solar Equip IN + Unit 21.000.000,00 Taksir E.27 47,00 987.000.000,00
Tiang Pipa Galvanis Dia. 5" t : 3,2 mm + instalasi, aksesories
lain Lengkap terpasang (sesuai gambar)

Jumlah Harga Pekerjaan Jalan Jawa - Hagu 10.085.303.096,64


III. PEKERJAAN TALUD
1 Pekerjaan Galian Tanah (ALB) M3 35.281,00 Analisa EI- 3.1.(1a ) 239,42 8.446.977,02
2 Fondasi Cerucuk Penyedian dan Pemancangan Cerucuk M 69.487,00 Analisa EI-7.6.(1) 1.728,00 120.073.536,00
3 Pekerjaan Pondasi Pasangan Batu Kali M3 794.388,00 Analisa EI-7.9.(1) 239,42 190.192.374,96
4 Pekerjaan Dinding Pasangan Batu Kali M3 794.388,00 Analisa EI-7.9.(1) 1.258,74 999.927.951,12
5 Pekerjaan Sloof Uk. 30/20 cm
- Beton mutu sedang fc’= 20 Mpa M3 1.399.361,00 Analisa EI-7.1.(7a) 185,82 260.029.261,02
- Tulangan Polos Kg 15.157,00 Analisa EI-7.3.(1) 12.188,04 184.734.122,28
6 Pekerjaan Kolom Uk. 20/30 cm
- Beton mutu sedang fc’= 20 Mpa M3 1.399.361,00 Analisa EI-7.1.(7a) 35,70 49.957.187,70
- Tulangan Polos Kg 15.157,00 Analisa EI-7.3.(1) 6.216,00 94.215.912,00
7 Pekerjaan Balok Uk. 20/25 cm
- Beton mutu sedang fc’= 20 Mpa M3 1.399.361,00 Analisa EI-7.1.(7a) 80,17 112.186.771,37
- Tulangan Polos Kg 15.157,00 Analisa EI-7.3.(1) 8.906,98 135.003.095,86
8 Pekerjaan Dinding Beton Bertulang
- Beton mutu sedang fc’= 20 Mpa M3 1.399.361,00 Analisa EI-7.1.(7a) 857,26 1.199.616.210,86
- Tulangan Polos Kg 15.157,00 Analisa EI-7.3.(1) 36.393,77 551.620.371,89
Jumlah Harga Pekerjaan Talud 3.906.003.772,08
IV. PEKERJAAN SALURAN
1 Pekerjaan Galian Tanah (ALB) M3 35.281,00 Analisa EI- 3.1.(1a ) 941,64 33.222.000,84
2 Pekerjaan Pasir Urug M3 245.088,00 A.2.3.1.11 49,56 12.146.561,28
3 Lantai Kerja (Beton mutu rendah fc’= 10 Mpa / Mutu K-100) M3 1.013.756,00 Analisa EI-7.1.(10) 49,56 50.241.747,36
4 Pekerjaan Dinding dan Lantai Saluran
- Beton mutu sedang fc’= 20 Mpa M3 1.399.361,00 Analisa EI-7.1.(7a) 371,70 520.142.483,70
- Tulangan Polos Kg 15.157,00 Analisa EI-7.3.(1) 22.093,80 334.875.726,60
Jumlah Harga Pekerjaan Saluran 950.628.519,78
V. PEKERJAAN BOX CULVERT
1 Pekerjaan Galian Tanah (ALB) M3 35.281,00 Analisa EI- 3.1.(1a ) 95,20 3.358.751,20
2 Pekerjaan Pasir Urug M3 245.088,00 A.2.3.1.11 11,90 2.916.547,20
3 Lantai Kerja (Beton mutu rendah fc’= 10 Mpa / Mutu K-100) M3 1.013.756,00 Analisa EI-7.1.(10) 11,90 12.063.696,40
4 Pekerjaan Beton Bertulang Box Culvert
- Beton mutu sedang fc’= 20 Mpa M3 1.399.361,00 Analisa EI-7.1.(7a) 163,20 228.375.715,20
- Tulangan Polos Kg 15.157,00 Analisa EI-7.3.(1) 15.979,43 242.200.220,51

Jumlah Harga Pekerjaan Box Culvert 488.914.930,51


VI. PEKERJAAN POT BUNGA
1 Pekerjaan Galian Tanah (Manual) M3 95.220,00 A.2.3.1.1 112,42 10.704.251,52
2 Lantai Kerja (Beton mutu rendah fc’= 10 Mpa / Mutu K-100) M3 1.013.756,00 Analisa EI-7.1.(10) 20,48 20.761.722,88
3 Pekerjaan Pasangan Dinding Bata 1 : 4 M2 136.407,00 A.4.4.1.9 368,64 50.285.076,48
4 Pekerjaan Plesteran 1 : 4 M2 74.461,00 A.4.4.2.4 413,86 30.816.131,62
5 Pekerjaan Pengurugan dengan Tanah Humus M3 88.688,00 A.2.3.1.11.b 90,62 8.037.261,31
6 Dinding Batu Alam Andesit 10 x 20 cm (Pot Bunga) M2 532.982,00 A.4.4.3.58 159,65 85.089.510,34

Jumlah Harga Pekerjaan Pot Bunga 205.693.954,14

VII. PEKERJAAN TEMPAT DUDUK


1 Pekerjaan Galian Tanah (Manual) M3 95.220,00 A.2.3.1.1 2,30 219.386,88
2 Beton mutu sedang fc’= 20 Mpa (K-225) M3 1.399.361,00 Analisa EI-7.1.(7a) 8,06 11.284.447,10
3 Pekerjaan Baja Tulangan U 24 Polos Kg 15.157,00 Analisa EI-7.3.(1) 1.346,72 20.412.293,24
4 Pekerjaaan Keramik 40 x 40 cm (Polished) M2 305.221,00 A.4.4.3.9 20,48 6.250.926,08

Jumlah Harga Pekerjaan Tempat Duduk 38.167.053,31

VIII. PEKERJAAN TEMPAT SAMPAH


1 Pekerjaan Galian Tanah (Manual) M3 95.220,00 A.2.3.1.1 9,28 883.641,60
2 Lantai Kerja (Beton mutu rendah fc’= 10 Mpa / Mutu K-100) M3 1.013.756,00 Analisa EI-7.1.(10) 1,86 1.881.531,14
3 Pekerjaan Pasangan Dinding Bata 1 : 4 M2 136.407,00 A.4.4.1.9 111,36 15.190.283,52
4 Pekerjaan Plesteran 1 : 4 M2 74.461,00 A.4.4.2.4 222,72 16.583.953,92
Jumlah Harga Pekerjaan Tempat Sampah 34.539.410,18
HARGA SATUAN Analisa JUMLAH HARGA
NO. URAIAN PEKERJAAN SAT VOLUME

( Rp. ) ( Rp. )

IX. PEKERJAAN BALAI NELAYAN DAN TOILET


1 Pekerjaan Galian Tanah Pondasi Tapak (Manual) M3 95.220,00 A.2.3.1.1 28,00 2.666.160,00
2 Pekerjaan Pasir Urug M3 245.088,00 A.2.3.1.11 1,12 274.498,56
3 Lantai Kerja (Beton mutu rendah fc’= 10 Mpa / Mutu K-100) M3 1.013.756,00 Analisa EI-7.1.(10) 1,12 1.135.406,72
4 Pekerjaan Pondasi Tapak Uk. 60 x 60 cm
- Beton mutu sedang fc’= 20 Mpa M3 1.399.361,00 Analisa EI-7.1.(7a) 1,89 2.644.792,29
- Tulangan Polos Kg 15.157,00 Analisa EI-7.3.(1) 1.182,00 17.915.574,00
5 Pekerjaan Kolom Pedestal Uk. 20 x 20 cm
- Beton mutu sedang fc’= 20 Mpa M3 1.399.361,00 Analisa EI-7.1.(7a) 1,40 1.959.105,40
- Tulangan Polos Kg 15.157,00 Analisa EI-7.3.(1) 547,00 8.290.879,00
6 Pekerjaan Sloof Uk. 20 x 25 cm
- Beton mutu sedang fc’= 20 Mpa M3 1.399.361,00 Analisa EI-7.1.(7a) 1,35 1.889.137,35
- Tulangan Polos Kg 15.157,00 Analisa EI-7.3.(1) 188,00 2.849.516,00
7 Pekerjaan Kolom Praktis Uk. 15 x 15 cm
- Beton mutu sedang fc’= 20 Mpa M3 1.399.361,00 Analisa EI-7.1.(7a) 0,74 1.035.527,14
- Tulangan Polos Kg 15.157,00 Analisa EI-7.3.(1) 97,00 1.470.229,00
8 Pekerjaan Ring Balok Uk. 15 x 20 cm
- Beton mutu sedang fc’= 20 Mpa M3 1.399.361,00 Analisa EI-7.1.(7a) 0,81 1.133.482,41
- Tulangan Polos Kg 15.157,00 Analisa EI-7.3.(1) 82,00 1.242.874,00
9 Pekerjaan Pasangan Dinding Bata 1 : 4 M2 136.407,00 A.4.4.1.9 75,22 10.260.534,54
10 Pekerjaan Plesteran 1 : 4 M2 74.461,00 A.4.4.2.4 104,75 7.799.789,75
11 Pasangan Lantai Keramik 30 x 30 cm M2 376.826,00 A.4.4.3.10 18,95 7.140.852,70
12 Pasangan Dinding Keramik 30 x 60 cm M2 343.286,00 A.4.4.3.9.a 45,69 15.684.737,34
13 Pekerjaan Kusen dan Daun Pintu Alumunium Type PA1 Unit 2.850.000,00 Taksir E.8 2,00 5.700.000,00
14 Pekerjaan Kusen dan Daun Pintu Kayu Type PK1 Unit 3.050.000,00 Taksir E.9 4,00 12.200.000,00
15 Pekerjaan Kayu Kelas I
- Kolom Kayu Kelas I Uk. 10/10 M3 12.063.535,00 A.4.6.1.1 0,84 10.133.369,40
- Balok Kayu Kelas I Uk. 7/13 M3 12.063.535,00 A.4.6.1.1 1,64 19.836.915,05
- Ring Balok Kayu Kelas I Uk. 5 x 10 M3 12.063.535,00 A.4.6.1.1 0,20 2.370.484,63
- Kuda - Kuda Kayu Klas I M3 12.063.535,00 A.4.6.1.1 2,18 26.274.379,23
- Gording 5/7 M3 12.063.535,00 A.4.6.1.1 2,06 24.893.104,47
- Listplank M3 12.063.535,00 A.4.6.1.1 0,37 4.410.428,40
- Lantai Papan kayu Kelas I M3 12.063.535,00 A.4.6.1.1 2,49 30.076.805,46
- Tangga M3 12.063.535,00 A.4.6.1.1 0,08 955.431,97
16 Baut M16 Bh 24.000,00 Taksir E.11 264,00 6.336.000,00
17 Angkur Besi Plat + Baut Unit 35.000,00 Taksir E.12 18,00 630.000,00
18 Atap Seng Galvalum 0.30 mm, Siap Terpasang M2 115.221,00 A.4.5.2.39 262,20 30.210.946,20
19 Rabung Seng Galvalum 0.30 mm, Siap Terpasang M 74.047,00 A.4.5.2.40 28,50 2.110.339,50
20 Rangka Plafond Kayu Klas II M2 145.926,00 A.4.6.1.20 206,35 30.111.830,10
21 Penutup Plafond Triplek 6 mm M2 81.219,00 A.4.5.1.5 206,35 16.759.540,65
22 Tombak layar Papan Ornamen Dari Tripleks Motif Ukiran Unit 850.000,00 Taksir E.17 2,00 1.700.000,00
23 Pekerjaan Pengecatan Bidang Kayu Baru M2 69.535,00 A.4.7.1.4 424,46 29.514.826,10
24 Pekerjaan Pengecatan Dinding Tembok Baru M2 30.449,00 A.4.7.1.10 104,90 3.194.100,10
25 Instalasi Air Bersih, Pipa PVC AW Dia. 3/4 Inch M 148.561,00 A.5.1.1.26 36,00 5.348.196,00
26 Instalasi Air Kotor Cair, Pipa PVC AW Dia. 3 Inch M 325.735,00 A.5.1.1.31 24,00 7.817.640,00
27 Instalasi Air Kotor Padat, Pipa PVC AW Dia. 4 Inch M 368.360,00 A.5.1.1.32 48,00 17.681.280,00
28 Pekerjaan Kloset Jongkok Unit 616.429,00 A.5.1.1.2 2,00 1.232.858,00
29 Kran Air 1/2 Inch Bh 69.972,00 A.5.1.1.19 10,00 699.720,00
30 Floor Drain Bh 91.615,00 A.5.1.1.14 4,00 366.460,00
31 Septicktank + Persapan Ls 3.000.000,00 Taksir E.26 1,00 3.000.000,00
32 Pemasukan Arus Listrik PLN 10 Ampere Ls 3.500.000,00 Taksir E.28 1,00 3.500.000,00
33 Lampu TL 2x18 W Inbow Cup Sun Assesorries Philips Titik 150.000,00 Taksir E.29 10,00 1.500.000,00
34 Lampu SL 18 Watt Unit 65.000,00 Taksir E.30 8,00 520.000,00
35 Saklar Tunggal M' 35.000,00 Taksir E.31 3,00 105.000,00
36 Saklar Ganda Unit 40.000,00 Taksir E.32 5,00 200.000,00
37 Stop Kontak M' 35.000,00 Taksir E.33 4,00 140.000,00
38 Titik Api Unit 60.000,00 Taksir E.34 18,00 1.080.000,00
39 Kabel NYM 2 x 1,5 mm , Supreme M' 11.500,00 Taksir E.35 108,00 1.242.000,00
Jumlah Harga Pekerjaan Balai Nelayan dan Toilet 387.244.751,46
A JUMLAH HARGA SELURUHNYA 16.216.295.488,09
B DIBULATKAN 16.216.295.000,00
F. PEKERJAAN PEMASANGAN LAMPU SOLAR SELL
I. PEKERJAAN LAMPU JALAN
1 Lampu BRP710 LED30 CW MR S1 12V LFP AIO Solar Equip IN + Unit 15.015.000,00 Taksir E.27 120,00 1.801.800.000,00

Jumlah Harga Pekerjaan Lampu Jalan 1.801.800.000,00

A JUMLAH HARGA SELURUHNYA 1.801.800.000,00


B DIBULATKAN 1.801.000.000,00
ATAP PLAT, TEBAL 1,8 MM
TERALIS BESI Ø 10 MM
MESIN POMPA AIR JET PUMP
BETON COR K-100
KRAN AIR 3/4"
PAS. BATA 1 : 2 15
TANAH URUG
PAS. BATA 1 : 2
100
BETON COR K-100, T= 10 CM
85
PASIR URUG, T= 5 CM
20
20 TANAH URUG 20
10 BETON COR K-100
30
25 100 BETON COR K-100
200
PIPA CASSING Ø 4"
KLEP Ø 1"
PIPA PVC TEGAK Ø 1"
Pipa PVC Ø 1"
KE TOWER AIR
KRAN AIR
A
Tee PVC Ø 1"
Elbow PVC Ø 1"
Socket Drat dalam PVC Ø 1" 7000
SOCKET Ø 4"
Klep Ø 1"
200
A T. CUCI
A DETAIL - A
Skala 1 : 10
PIPA CASSING Ø 4"
100 (DILUBANGI)
MESIN POMPA
KERIKIL
200 100
DENAH RUMAH POMPA DOP Ø4"
Skala 1 : 25
POTONGAN A - A
Skala 1 : 25
100
Jln. Stadion Tunas Bangsa No. 01 Telp. (0645) 630037
Lhokseumawe
100 K 25/25 Kode Paket
A Sloof 20/30 K 25/25
Catatan :
Sloof 20/30

Sloof 20/30

160
160
160
Sloof 20/30 K 25/25
K 25/25
DENAH TOWER 160
Skala 1 : 50 DENAH SLOOF DENAH KOLOM Kegiatan
DENAH PONDASI Skala 1 : 50
Skala 1 : 50 Skala 1 : 50 PENYEDIAAN PRASARANA DAN SARANA AIR MINUM
BAGI MASYARAKAT BERPENGHASILAN RENDAH
Pekerjaan
PEKERJAAN SUMUR BOR DALAM, RESERVOIR
DAN JARINGAN DISTRIBUSI
Lokasi
KECAMATAN BLANG BAND SAKTI
KOTA LHOKSEUMAWE
JUDUL GAMBAR HALAMAN
POLYTANK POLYTANK POLYTANK POLYTANK
DENAH 1 : 100 03
TAMPAK 1 : 100
Penanggung Jawab :
Konsultan Perencana
CV. BROTHER ENGINEERS
ASROL, ST.MT
Direktur
Surveyor
Wedi Hepri, A.md
Ahli Sipil
T. BELAKANG
Skala 1 : 50
T. DEPAN T. SAMPING KANAN T. SAMPING KIRI Sanoval, ST.
Diperiksa Oleh :
Skala 1 : 50 Skala 1 : 50 Skala 1 : 50
Team Leader:
Ali Al Shakhi, ST.
MENGETAHUI :
PPTK Perencanaan & Paraf :
Pengawasan
PPK Perencanaan & Paraf :
Pengawasan
Jln. Stadion Tunas Bangsa No. 01 Telp. (0645) 630037
Lhokseumawe
Kode Paket
Catatan :
POLYTANK
Besi Pengaman Tangki 20
Balok Lantai 20/30 50
Kegiatan
Kolom 25/25 5
PENYEDIAAN PRASARANA DAN SARANA AIR MINUM
20 BAGI MASYARAKAT BERPENGHASILAN RENDAH
Ø 14-15
Aanstamping 10
310 Pasir Urug 5 Pekerjaan
Balok 15/25
PEKERJAAN SUMUR BOR DALAM, RESERVOIR
DAN JARINGAN DISTRIBUSI
Lokasi
Sloof 20/30
KECAMATAN BLANG BAND SAKTI

Ø 14-15
Ø 14-15
KOTA LHOKSEUMAWE
100 25
50 Tanah Urug 25 JUDUL GAMBAR HALAMAN
90
Ø 14-15
20 Pondasi tapak
DENAH 1 : 50
Aanstamping Batu Kali Ø 14-15 04
Pasir Alas POTONGAN 1 : 50
10
5 DETAIL 1 : 25
160
100
Penanggung Jawab :
POTONGAN - A Konsultan Perencana
DETAIL PONDASI TAPAK CV. BROTHER ENGINEERS
Skala 1 : 50
Skala 1 : 25
ASROL, ST.MT
Direktur
Surveyor
Balok 20/30
Balok 15/25

Balok 20/30

Balok 20/30
Ø 10 -15
Balok 15/25

Balok 15/25
160 Ø 10 -15 Wedi Hepri, A.md

Ø 10 -15
Ø 10 -15
Ahli Sipil
Balok 20/30
Balok 15/25 Sanoval, ST.
160 Diperiksa Oleh :
Team Leader:
DENAH BALOK DENAH BALOK LANTAI
Skala 1 : 50 Skala 1 : 50 DENAH PEMBESIAN PLAT LANTAI
Ali Al Shakhi, ST.
Skala 1 : 50
MENGETAHUI :
PPTK Perencanaan & Paraf :
Pengawasan
PPK Perencanaan & Paraf :
Pengawasan
Jln. Stadion Tunas Bangsa No. 01 Telp. (0645) 630037
Lhokseumawe
Kode Paket
Catatan :
Balok Lantai 20/30
Kolom 25/25
Kolom 25/25
2 Balok Gantung 15/25
Kegiatan
310 PENYEDIAAN PRASARANA DAN SARANA AIR MINUM
BAGI MASYARAKAT BERPENGHASILAN RENDAH
Pekerjaan
160 135 PEKERJAAN SUMUR BOR DALAM, RESERVOIR
DAN JARINGAN DISTRIBUSI
Kolom 25/25 Kolom 25/25
Lokasi
KECAMATAN BLANG BAND SAKTI
KOTA LHOKSEUMAWE
Sloof 20/30
JUDUL GAMBAR HALAMAN
1 DENAH PORTAL 1 : 25
POT. PORTAL 1 : 25
05
160
Penanggung Jawab :
A B 90
Konsultan Perencana
CV. BROTHER ENGINEERS
DENAH PORTAL ASROL, ST.MT
Direktur
Skala 1 : 25
160 Surveyor
A B Wedi Hepri, A.md
Ahli Sipil
PORTAL AS - 1
Skala 1 : 25
Sanoval, ST.
Diperiksa Oleh :
Team Leader:
Ali Al Shakhi, ST.
MENGETAHUI :
PPTK Perencanaan & Paraf :
Pengawasan
PPK Perencanaan & Paraf :
Pengawasan
Jln. Stadion Tunas Bangsa No. 01 Telp. (0645) 630037
Lhokseumawe
Kode Paket
TYPE BALOK BALOK SLOOF BALOK GANTUNG BALOK LANTAI Catatan :
AREA TUMPUAN LAPANGAN TUMPUAN LAPANGAN TUMPUAN LAPANGAN
12
MODEL
30 30 25 25 30 30
Kegiatan
15 15
20 20 20 20 PENYEDIAAN PRASARANA DAN SARANA AIR MINUM
BAGI MASYARAKAT BERPENGHASILAN RENDAH
Pekerjaan
TULANGAN BAWAH 2 Ø 12 2 Ø 12 2 Ø 12 2 Ø 12 2 Ø 12 2 Ø 12
PEKERJAAN SUMUR BOR DALAM, RESERVOIR
DAN JARINGAN DISTRIBUSI
TULANGAN ATAS 2 Ø 12 2 Ø 12 2 Ø 12 2 Ø 12 2 Ø 12 2 Ø 12 Lokasi
TULANGAN TENGAH 2 Ø 12 2 Ø 12 2 Ø 12 2 Ø 12 KECAMATAN BLANG BAND SAKTI
TULANGAN TROMOL 1 Ø 12 1 Ø 12 1 Ø 12 1 Ø 12 1 Ø 12 1 Ø 12 KOTA LHOKSEUMAWE
BEHEL Ø 8 - 100 Ø 8 - 150 Ø 8 - 100 Ø 8 - 150 Ø 8 - 100 Ø 8 - 150 JUDUL GAMBAR HALAMAN
TYPE BALOK KOLOM
TABEL PEMBESIAN 06
AREA
Penanggung Jawab :
Konsultan Perencana
CV. BROTHER ENGINEERS
MODEL
25
ASROL, ST.MT
Direktur
Surveyor
25
Wedi Hepri, A.md
TULANGAN BAWAH 3 Ø 14 Ahli Sipil
TULANGAN ATAS 3 Ø 14
TULANGAN TENGAH 2 Ø 14 Sanoval, ST.
TULANGAN TROMOL Diperiksa Oleh :
Team Leader:
BEHEL Ø 8 - 150
Ali Al Shakhi, ST.
MENGETAHUI :
PPTK Perencanaan & Paraf :
Pengawasan
PPK Perencanaan & Paraf :
Pengawasan
TARIKAN BESI Ø 12
PIPA HAWA GIP Ø 1"
40 TUTUP BETON
BERTULANG
6
Ø 10 - 12,5 40 PAS. BATA
TRASRAAM
KEDALAMAN SESUAI
15 ELEVASI SALURAN
PIPA PVC Ø 3"
10 80
5
2%
12,5 PERMUKAAN TANAH
30
40 2% 10 PASIR URUG
10 CM
DARI TOILET 12,5 12,5
35 20
PIPA PVC Ø 4" 25
KE PERESAPAN
25 10
PIPA PVC Ø 4" 50
POTONGAN IJUK T = 10 CM
60 PIPA PVC Ø 4"
PIPA PVC Ø3"
200
12,5 160 KERIKIL KASAR
( Ø 2 - 5 CM )
SUMURAN Ø 100 CM PAS. BATA
50 35 TRASRAAM 30 KERIKIL HALUS
( Ø 1 - 2 CM )
12,5
30 PASIR URUG
LANTAI KERJA 1 : 3 : 5 - 5 CM PIPA PVC Ø 3"
PASIR URUG 10 CM 10
12,5 35 12,5
5 50
10 60
DETAIL SEPTICTNAK 1 : 30
DENAH POTONGAN B - B DETAIL RESAPAN
DETAIL BAK KONTROL
1 : 30
1 : 30
100
SKALA 1 : 30
DETAIL BAK KONTROL
POTONGAN A - A 1 : 30
SKALA 1 : 30
IJUK 10 CM
TUTUP SEPTIC TANK B
PIPA HAWA GIP Ø 1" BETON BERTULANG KERIKIL DIA. 2 - 5 CM
TARIKAN BESI Ø 16 MM SUMURAN Ø 100 CM PVC Ø 4" DILUBANG-LUBANGI
10
A A
80 60
DARI TOILET KE PERESAPAN
PIPA PVC Ø 4" PIPA PVC Ø 4" DARI SEPTICTANK KE RIOL
PVC Ø 4"
10
100 10 380 10
DENAH SEPTIC TANK 400
SKALA 1 : 30
B DENAH BAK PERESAPAN
1 : 30
B C
500
250 110 140
E
KM/WC
160

160

- 0.05
D
K. TIDUR
± 0.00
350

350

A A
860

860

R. TAMU TAMPAK DEPAN


C
± 0.00
270
350

K. TIDUR
± 0.00
B
TERAS
80

80
- 0.05
A
250 250
500
1 2 3 4
B C
DENAH RENCANA
TAMPAK BELAKANG
2
TAMPAK SAMPING KANAN TAMPAK SAMPING KIRI
Rabung T=0,25 mm - 5 mm
Atap Spandek T=0,3 mm (Cat Pabrik)
C. 75 T = 0.60 mm
Reng ST 35 T = 0.40 mm
K1 K1 K1 K1 K1
+ 4.55 Atap+ 4.55
Atap
482
155

155
60 60
60 60
+ 3.00 + 3.00 60 60
15

15
Ring Balk Ring Balk
Elv. + 2.80 Elv. + 2.80 80
Elv. + 2.80 Elv. + 2.80 80
80 PLafond PVC PLafond PVC 80 PLafond PVC PLafond PVC
PLafond PVC
460

460
285

285
Pas. Keramik 40 x 40 cm
Lantai Cor
Pasir Urug
Lantai Keramik (40 x 40 cm) Lantai Keramik Beton Cor K-175 Tanah Urug Lantai Keramik (40 x 40 cm)
Lantai Keramik (40 x 40 cm)
± 0.00 Elv. ± 0.00 Elv. ± 0.00
± 0.00 Elv. ± 0.00
Elv. ± 0.00
5 30 21 5

5 30 21 5
Lantai Ruangan Muka Tanah
Lantai Ruangan
Muka Tanah
Elv. - 0.26 Elv. - 0.26
- 0.56 - 0.56
Galian Pondsasi Galian Pondsasi
270 270 80
250 250 750
1
500 A B C C
1 3 4
POTONGAN A - A POTONGAN B - B
3
Rabung T=0,25 mm - 5 mm
Atap Spandek T=0,3 mm (Cat Pabrik)
Reng ST 35 T = 0.40 mm
C. 75 T = 0.60 mm
C. 75 T = 0.60 mm
C. 75 T = 0.60 mm
A
480
155

B
620 60
60
C 60
15
Elv. + 2.80
PLafond PVC
Kanal C. 75 T = 0.60 mm
DETAIL KUDA-KUDATYPE 1
Reng ST 35 T = 0.40 mm
Rabung T=0,25 mm - 5 mm Bracket L
Atap Spandek T=0,3 mm (Cat Pabrik)
Reng ST 35 T = 0.40 mm Ring Balok
C. 75 T = 0.60 mm
C. 75 T = 0.60 mm
C. 75 T = 0.60 mm
482
60 60
60 60
60 60
ISOMETRI IKATAN KUDA-KUDA
80
Elv. + 2.80 Elv. + 2.80 80
PLafond PVC PLafond PVC
DETAIL KUDA-KUDATYPE 2
Rabung C.75 T = 0.60 mm C.75 T = 0.60 mm
Atap Spandek T = 03 mm (Cat Pabrik) Reng ST 35 T = 0.40 mm
Reng ST 35 T = 0.40 mm
C.75 T = 0.60 mm Screw
C.75 T = 0.60 mm Screw
C.75 T = 0.60 mm C.75 T = 0.60 mm
C.75 T = 0.60 mm Atap Zincalume (Cat Pabrik)
C.75 T = 0.60 mm
Reng ST 35 T = 0.40 mm
Screw
DynaBolt
Screw Ring Balk
DETAIL A DETAIL B DETAIL C DETAIL D
500
250 110 140
Plafon
75

PVC T = 6 mm
E
80

Plafon
160

PVC T = 6 mm
Plafon
PVC T = 6 mm D
D
350
Plafon
PVC T = 6 mm
350

PVC T = 6 mm

PVC T = 6 mm
860

Plafon

Plafon

700
C
Plafon
C PVC T = 6 mm
270

350
Plafon
PVC T = 6 mm
B
B
Plafon
80

PVC T = 6 mm A
A

80
Plafon
PVC T = 6 mm
75 250 250 75 75 250 250 75
500 500
1 2 3 4 1 2 3 4
DENAH PLAFOND TAMPAK ATAP
Rabung T=0,25 mm - 5 mm
Atap Spandek T=0,3 mm (Cat Pabrik)
Reng ST 35 T = 0.40 mm
C. 75 T = 0.60 mm A
+ 4.55
C. 75 T = 0.60 mm
Atap 500
C. 75 T = 0.60 mm
250 110 140
480
155

E
620 60 Sloof 15x20 cm

Sloof 15x20 cm

Sloof 15x20 cm
60
60 + 3.00
160

160
15

Ring Balk
Elv. + 2.80
PLafond PVC
461

D
54

Sloof 15x20 cm Sloof 15x20 cm


286
244
190

Sloof 15x20 cm
Pas. Keramik 40 x 40 cm

Sloof 15x20 cm
Lantai Cor
Pasir Urug

350
Lantai Keramik (40 x 40 cm)
Tanah Urug
Lantai Keramik (40 x 40Beton
cm) Finish Acian
Elv. ± 0.00
Elv. ± 0.00 Elv. - 0.05 ± 0.00

5 30 21 5
Muka Tanah
Elv. - 0.26
Lantai
- 0.56

860
80 270 270 83
750

Sloof 15x20 cm
C C B A

700
C
POTONGAN C - C Sloof 15x20 cm
Pas. Bata

Sloof 15x20 cm
Sloof 15 x 20 cm

Sloof 15x20 cm
160 Tanah Timbun T = 20 cm

270
Pasir Urug T = 3 cm
Lantai Keramik 40 x 40 cm
70
Lantai Keramik
Elv. ± 0.00
Beton Cor Lantai Finis Acian
15

Elv. - 0.05 Sloof 15x20 cm


6

6
B
26

26
20

20

Tanah dasar
Elv. - 0.26

80
20 20 Sloof 15x20 cm
Pond. Rolag Bata

25
25

25
A
30

30
5

5
B
15 15
30 30
C
Pas. Batu Kali Pas. Batu Kali
Pasir Urug
POTONGAN - A Pasir Urug Pas. Bata
13 220
250 250
Sloof 15 x 20 cm
Tanah Timbun, t = 20 cm 500
18
13 Pasir Urug, t = 3 cm 1 2 3 4
Pas. Bata Lantai Cor, t = 3 cm
Sloof 15 x 20 cm Pas. Keramik 40 x 40 cm
Tanah Timbun T = 15 cm
Pasir Urug T = 3 Cm
Lantai Keramik (40 x 40 cm)
Lantai Cor , t = 3 cm Elv. ± 0.00

5
DENAH PONDASI & SLOOF

26
20
Lantai Keramik (40 x 40 cm)
Elv. ± 0.00 Beton Cor Lantai Finis Acian
Elv. - 0.05

6 5
6

20

25
26

25
30
20

15

5
3 10
20

25
25
15

30

30
20
30
Pas. Batu Kali

5
Pasir Urug

5
15
POTONGAN - B 30
POTONGAN - C
Pas. Batu Kali
Pasir Urug
PEMERINTAH KOTA LHOKSEUMAWE
DINAS PEKERJAAN UMUM
DAN PERUMAHAN RAKYAT
Jl. H. Ramli Ridwan No. 1 Telp (0645) 630037
LEMBAR PENGESAHAN
PERENCANAAN INSFRASTRUKTUR DASAR DAN PERUMAHAN
PERMUKIMAN SKALA KAWASAN ( HAGU, KP. JAWA DAN PUSONG )
LOKASI : KOTA LHOKSEUMAWE
Mengetahui : Di setujui : Dibuat / Diperiksa :
KEPALA DINAS PEKERJAAN UMUM KABID ENERGI, SUMBER DAYA MINERAL CV. BROTHER ENGINEERS
DAN PERUMAHAN RAKYAT DAN SUMBER DAYA AIR
KOTA LHOKSEUMAWE
SAFARUDDIN, ST, MT T. SYAHRIAL, ST ASROL, ST.MT
Pembina/NIP. 19740320 200604 1 008 Nip. 19820321 200504 1 002 Direktur
PEMERINTAH KOTA LHOKSEUMAWE
DINAS PEKERJAAN UMUM
DAN PERUMAHAN RAKYAT
Jl. H. Ramli Ridwan No. 1 Telp (0645) 630037
GAMBAR KERJA
PERENCANAAN INSFRASTRUKTUR DASAR DAN PERUMAHAN
PERMUKIMAN SKALA KAWASAN ( HAGU, KP. JAWA DAN PUSONG )
LOKASI : KOTA LHOKSEUMAWE
CV. BROTHER ENGINEERS
SITE PLAN RENCANA
SKALA 1 : 100
Gunding Block 30 x 30 cm
Beton Mutu Sedang fc' = 19,3 Mpa, K-225
T = 15 cm Finishing Grooving
Besi Beton Polos Ø 10 - 150 mm
Beton Mutu Rendah fc' = 15 Mpa, K-175 Lean Concreat K - 100, t = 5 cm
Beton Mutu Sedang fc' = 19,3 Mpa, K-225
Pasangan Batu Kali
Talud ( Pas Batu Kali )
Saluran Rencana
Geotextile Non Woven ( Pondasi Batu Kali )
Timbunan
Cerucuk Bambu
CROSS STA. 0 + 000
SKALA 1 : 100
Gunding Block 30 x 30 cm
Beton Mutu Sedang fc' = 19,3 Mpa, K-225
T = 15 cm Finishing Grooving
Besi Beton Polos Ø 10 - 150 mm
Beton Mutu Rendah fc' = 15 Mpa, K-175 Lean Concreat K - 100, t = 5 cm
Beton Mutu Sedang fc' = 19,3 Mpa, K-225
Pasangan Batu Kali
Talud ( Pas Batu Kali )
Saluran Rencana
Geotextile Non Woven ( Pondasi Batu Kali )
Timbunan
Cerucuk Bambu
CROSS STA. 0 + 100
SKALA 1 : 100
Gunding Block 30 x 30 cm
Beton Mutu Sedang fc' = 19,3 Mpa, K-225
T = 15 cm Finishing Grooving
Besi Beton Polos Ø 10 - 150 mm
Beton Mutu Rendah fc' = 15 Mpa, K-175 Lean Concreat K - 100, t = 5 cm
Beton Mutu Sedang fc' = 19,3 Mpa, K-225
Pasangan Batu Kali
Talud ( Pas Batu Kali )
Saluran Rencana
Geotextile Non Woven ( Pondasi Batu Kali )
Timbunan
Cerucuk Bambu
CROSS STA. 0 + 200
SKALA 1 : 100
Gunding Block 30 x 30 cm
Beton Mutu Sedang fc' = 19,3 Mpa, K-225
T = 15 cm Finishing Grooving
Besi Beton Polos Ø 10 - 150 mm
Beton Mutu Rendah fc' = 15 Mpa, K-175 Lean Concreat K - 100, t = 5 cm
Beton Mutu Sedang fc' = 19,3 Mpa, K-225
Pasangan Batu Kali
Talud ( Pas Batu Kali )
Saluran Rencana
Geotextile Non Woven ( Pondasi Batu Kali )
Timbunan
Cerucuk Bambu
CROSS STA. 0 + 300
SKALA 1 : 100
Gunding Block 30 x 30 cm
Beton Mutu Sedang fc' = 19,3 Mpa, K-225
T = 15 cm Finishing Grooving
Besi Beton Polos Ø 10 - 150 mm
Beton Mutu Rendah fc' = 15 Mpa, K-175 Lean Concreat K - 100, t = 5 cm
Beton Mutu Sedang fc' = 19,3 Mpa, K-225
Pasangan Batu Kali
Talud ( Pas Batu Kali )
Saluran Rencana
Geotextile Non Woven ( Pondasi Batu Kali )
Timbunan
Cerucuk Bambu
CROSS STA. 0 + 400
SKALA 1 : 100
Gunding Block 30 x 30 cm
Beton Mutu Sedang fc' = 19,3 Mpa, K-225
T = 15 cm Finishing Grooving
Besi Beton Polos Ø 10 - 150 mm
Beton Mutu Rendah fc' = 15 Mpa, K-175 Lean Concreat K - 100, t = 5 cm
Beton Mutu Sedang fc' = 19,3 Mpa, K-225
Pasangan Batu Kali
Talud ( Pas Batu Kali )
Saluran Rencana
Geotextile Non Woven ( Pondasi Batu Kali )
Timbunan
Cerucuk Bambu
CROSS STA. 0 + 500
SKALA 1 : 100
Gunding Block 30 x 30 cm
Beton Mutu Sedang fc' = 19,3 Mpa, K-225
T = 15 cm Finishing Grooving
Besi Beton Polos Ø 10 - 150 mm
Beton Mutu Rendah fc' = 15 Mpa, K-175 Lean Concreat K - 100, t = 5 cm
Beton Mutu Sedang fc' = 19,3 Mpa, K-225
Pasangan Batu Kali
Talud ( Pas Batu Kali )
Saluran Rencana
Geotextile Non Woven ( Pondasi Batu Kali )
Timbunan
Cerucuk Bambu
CROSS STA. 0 + 600
SKALA 1 : 100
Gunding Block 30 x 30 cm
Beton Mutu Sedang fc' = 19,3 Mpa, K-225
T = 15 cm Finishing Grooving
Besi Beton Polos Ø 10 - 150 mm
Beton Mutu Rendah fc' = 15 Mpa, K-175 Lean Concreat K - 100, t = 5 cm
Beton Mutu Sedang fc' = 19,3 Mpa, K-225
Pasangan Batu Kali
Talud ( Pas Batu Kali )
Saluran Rencana
Geotextile Non Woven ( Pondasi Batu Kali )
Timbunan
Cerucuk Bambu
CROSS STA. 0 + 700
SKALA 1 : 100
Gunding Block 30 x 30 cm
Beton Mutu Sedang fc' = 19,3 Mpa, K-225
T = 15 cm Finishing Grooving
Besi Beton Polos Ø 10 - 150 mm
Beton Mutu Rendah fc' = 15 Mpa, K-175 Lean Concreat K - 100, t = 5 cm
Beton Mutu Sedang fc' = 19,3 Mpa, K-225
Pasangan Batu Kali
Talud ( Pas Batu Kali )
Saluran Rencana
Geotextile Non Woven ( Pondasi Batu Kali )
Timbunan
Cerucuk Bambu
CROSS STA. 0 + 800
SKALA 1 : 100
Gunding Block 30 x 30 cm
Beton Mutu Sedang fc' = 19,3 Mpa, K-225
T = 15 cm Finishing Grooving
Besi Beton Polos Ø 10 - 150 mm
Beton Mutu Rendah fc' = 15 Mpa, K-175 Lean Concreat K - 100, t = 5 cm
Beton Mutu Sedang fc' = 19,3 Mpa, K-225
Pasangan Batu Kali
Talud ( Pas Batu Kali )
Saluran Rencana
Geotextile Non Woven ( Pondasi Batu Kali )
Timbunan
Cerucuk Bambu
CROSS STA. 0 + 900
SKALA 1 : 100
Gunding Block 30 x 30 cm
Beton Mutu Sedang fc' = 19,3 Mpa, K-225
T = 15 cm Finishing Grooving
Besi Beton Polos Ø 10 - 150 mm
Beton Mutu Rendah fc' = 15 Mpa, K-175 Lean Concreat K - 100, t = 5 cm
Beton Mutu Sedang fc' = 19,3 Mpa, K-225
Pasangan Batu Kali
Talud ( Pas Batu Kali )
Saluran Rencana
Geotextile Non Woven ( Pondasi Batu Kali )
Timbunan
Cerucuk Bambu
CROSS STA. 1 + 000
SKALA 1 : 100
Gunding Block 30 x 30 cm
Beton Mutu Sedang fc' = 19,3 Mpa, K-225
T = 15 cm Finishing Grooving
Besi Beton Polos Ø 10 - 150 mm
Beton Mutu Rendah fc' = 15 Mpa, K-175 Lean Concreat K - 100, t = 5 cm
Beton Mutu Sedang fc' = 19,3 Mpa, K-225
Pasangan Batu Kali
Talud ( Pas Batu Kali )
Saluran Rencana
Geotextile Non Woven ( Pondasi Batu Kali )
Timbunan
Cerucuk Bambu
CROSS STA. 1 + 100
SKALA 1 : 100
Gunding Block 30 x 30 cm
Beton Mutu Sedang fc' = 19,3 Mpa, K-225
T = 15 cm Finishing Grooving
Besi Beton Polos Ø 10 - 150 mm
Beton Mutu Rendah fc' = 15 Mpa, K-175 Lean Concreat K - 100, t = 5 cm
Beton Mutu Sedang fc' = 19,3 Mpa, K-225
Pasangan Batu Kali
Talud ( Pas Batu Kali )
Saluran Rencana
Geotextile Non Woven ( Pondasi Batu Kali )
Timbunan
Cerucuk Bambu
CROSS STA. 1 + 200
SKALA 1 : 100
Gunding Block 30 x 30 cm
Beton Mutu Sedang fc' = 19,3 Mpa, K-225
T = 15 cm Finishing Grooving
Besi Beton Polos Ø 10 - 150 mm
Beton Mutu Rendah fc' = 15 Mpa, K-175 Lean Concreat K - 100, t = 5 cm
Beton Mutu Sedang fc' = 19,3 Mpa, K-225
Pasangan Batu Kali
Talud ( Pas Batu Kali )
Saluran Rencana
Geotextile Non Woven ( Pondasi Batu Kali )
Timbunan
Cerucuk Bambu
CROSS STA. 0 + 300
SKALA 1 : 100
Gunding Block 30 x 30 cm
Beton Mutu Sedang fc' = 19,3 Mpa, K-225
T = 15 cm Finishing Grooving
Besi Beton Polos Ø 10 - 150 mm
Beton Mutu Rendah fc' = 15 Mpa, K-175 Lean Concreat K - 100, t = 5 cm
Beton Mutu Sedang fc' = 19,3 Mpa, K-225
Pasangan Batu Kali
Talud ( Pas Batu Kali )
Saluran Rencana
Geotextile Non Woven ( Pondasi Batu Kali )
Timbunan
Cerucuk Bambu
CROSS STA. 0 + 400
SKALA 1 : 100
Gunding Block 30 x 30 cm
Beton Mutu Sedang fc' = 19,3 Mpa, K-225
T = 15 cm Finishing Grooving
Besi Beton Polos Ø 10 - 150 mm
Beton Mutu Rendah fc' = 15 Mpa, K-175 Lean Concreat K - 100, t = 5 cm
Beton Mutu Sedang fc' = 19,3 Mpa, K-225
Pasangan Batu Kali
Talud ( Pas Batu Kali )
Saluran Rencana
Geotextile Non Woven ( Pondasi Batu Kali )
Timbunan
Cerucuk Bambu
CROSS STA. 0 + 500
SKALA 1 : 100

Anda mungkin juga menyukai