PEKERJAAN PERENCANAAN INSFRASTRUKTUR DASAR DAN PERUMAHAN PERMUKIMAN SKALA KAWASAN ( HAGU,
:
KP. JAWA DAN PUSONG )
LOKASI : KOTA LHOKSEUMAWE
T. ANGGARAN : 2022
Jumlah harga
NO. Uraian
(Rp.)
(A) Jumlah Harga Pekerjaan ( Termasuk Biaya Umum dan Keuntungan ) 40.545.136.239,00
(B) Pajak Pertambahan Nilai (PPN) = 11% x (A) 4.459.964.986,29
(C) JUMLAH TOTAL HARGA PEKERJAAN = (A) + (B) 45.000.000.000,00
Terbilang : Empat Puluh Lima Miliyar Rupiah,-
KONSULTAN PERENCANA :
CV. BROTHER ENGINEERS
Diketahui Oleh :
ASROL, ST. MT
Direktur
RINCIAN KUANTITAS PEKERJAAN
PEKERJAAN : PERENCANAAN INSFRASTRUKTUR DASAR DAN PERUMAHAN PERMUKIMAN SKALA KAWASAN ( HAGU, KP. JAWA DAN PUSONG )
LOKASI : KOTA LHOKSEUMAWE
TAHUN : 2022
( Rp. ) ( Rp. )
UPAH
1 Biaya Pengeboran M' 325.000,00 Taksir 135,00 43.875.000,00
2 Biaya Cuci Sumur Unit 1.500.000,00 Taksir 1,00 1.500.000,00
( Rp. ) ( Rp. )
C. PEKERJAAN TEMPAT PEMBUANGAN SAMPAH
I. PEKERJAAN PERSIAPAN
1 Papan Nama Proyek Ls 250.000,00 Taksir 1,00 250.000,00
2 Pemasangan Bouwplank/Pematokan Ls 500.000,00 Taksir 1,00 500.000,00
3 Administrasi dan Dokumentasi Proyek Ls 1.000.000,00 Taksir 1,00 1.000.000,00
4 Biaya Penyelenggaraan SMK3 Dihitung 1.000.000,00 Taksir 1,00 1.000.000,00
SUB TOTAL 2.750.000,00
II. PEKERJAAN TANAH
1 Galian M3 103.202,50 A.2.3.1.1 50,80 5.242.687,00
2 Urugan Pasir M3 12.000,00 Taksir 1,27 15.240,00
3 Lantai Kerja Pondasi Beton K - 175 M3 1.059.843,75 A.4.1.1.4 2,54 2.692.003,12
SUB TOTAL 7.949.930,12
III. PEKERJAAN BETON DAN BETON BERTULANG
1 Pekerjaan Beton Praktis 13 x 13 cm
Beton K-K225 M3 1.370.161,01 A.4.1.1.7 0,25 347.335,82
Besi Beton Polos KG 19.785,83 A.4.1.1.17.a 61,40 1.214.917,23
Bekisting M2 238.861,39 A.4.1.1.22 3,90 931.559,42
2 Pekerjaan Beton Plat Lantai, T = 10 Cm
Beton K-K225 M3 1.370.161,01 A.4.1.1.7 2,54 3.480.208,97
Besi Beton Polos KG 19.785,83 A.4.1.1.17.a 205,36 4.063.141,87
Bekisting M2 249.797,72 A.4.1.1.23 25,40 6.344.862,19
SUB TOTAL 16.382.025,50
IV. PEKERJAAN PASANGAN & PLESTERAN
1 Pasangan batu bata 1 : 2 M2 162.593,47 A.4.4.1.7 37,05 6.024.087,99
2 Plesteran 1 : 2 M2 93.829,17 A.4.4.2.2 74,10 6.952.741,17
( Rp. ) ( Rp. )
E. PEKERJAAN JALAN LINGKUNGAN/PENDESTRIAN DAN SALURAN TERTUTUP
I. PEKERJAAN PERSIAPAN
1 Penyelenggaraan Keamanan dan Kesehatan Kerja serta Ls 82.400.000,00 Taksir A.1 1,00 82.400.000,00
2 Keselamatan Kerja dan Demobilisasi
Pekerjaan Mobilisasi Ls 36.900.000,00 Taksir B.1 1,00 36.900.000,00
3 Pengadaan dan Pemasangan Papan Nama Proyek Unit 500.000,00 Taksir B.2 1,00 500.000,00
Jumlah Harga Pekerjaan Persiapan 119.800.000,00
( Rp. ) ( Rp. )
Sloof 20/30
160
160
160
Sloof 20/30 K 25/25
K 25/25
DENAH TOWER 160
Skala 1 : 50 DENAH SLOOF DENAH KOLOM Kegiatan
DENAH PONDASI Skala 1 : 50
Skala 1 : 50 Skala 1 : 50 PENYEDIAAN PRASARANA DAN SARANA AIR MINUM
BAGI MASYARAKAT BERPENGHASILAN RENDAH
Pekerjaan
PEKERJAAN SUMUR BOR DALAM, RESERVOIR
DAN JARINGAN DISTRIBUSI
Lokasi
KECAMATAN BLANG BAND SAKTI
KOTA LHOKSEUMAWE
JUDUL GAMBAR HALAMAN
POLYTANK POLYTANK POLYTANK POLYTANK
DENAH 1 : 100 03
TAMPAK 1 : 100
Penanggung Jawab :
Konsultan Perencana
CV. BROTHER ENGINEERS
ASROL, ST.MT
Direktur
Surveyor
Wedi Hepri, A.md
Ahli Sipil
T. BELAKANG
Skala 1 : 50
T. DEPAN T. SAMPING KANAN T. SAMPING KIRI Sanoval, ST.
Diperiksa Oleh :
Skala 1 : 50 Skala 1 : 50 Skala 1 : 50
Team Leader:
Ali Al Shakhi, ST.
MENGETAHUI :
PPTK Perencanaan & Paraf :
Pengawasan
PPK Perencanaan & Paraf :
Pengawasan
Jln. Stadion Tunas Bangsa No. 01 Telp. (0645) 630037
Lhokseumawe
Kode Paket
Catatan :
POLYTANK
Besi Pengaman Tangki 20
Balok Lantai 20/30 50
Kegiatan
Kolom 25/25 5
PENYEDIAAN PRASARANA DAN SARANA AIR MINUM
20 BAGI MASYARAKAT BERPENGHASILAN RENDAH
Ø 14-15
Aanstamping 10
310 Pasir Urug 5 Pekerjaan
Balok 15/25
PEKERJAAN SUMUR BOR DALAM, RESERVOIR
DAN JARINGAN DISTRIBUSI
Lokasi
Sloof 20/30
KECAMATAN BLANG BAND SAKTI
Ø 14-15
Ø 14-15
KOTA LHOKSEUMAWE
100 25
50 Tanah Urug 25 JUDUL GAMBAR HALAMAN
90
Ø 14-15
20 Pondasi tapak
DENAH 1 : 50
Aanstamping Batu Kali Ø 14-15 04
Pasir Alas POTONGAN 1 : 50
10
5 DETAIL 1 : 25
160
100
Penanggung Jawab :
POTONGAN - A Konsultan Perencana
DETAIL PONDASI TAPAK CV. BROTHER ENGINEERS
Skala 1 : 50
Skala 1 : 25
ASROL, ST.MT
Direktur
Surveyor
Balok 20/30
Balok 15/25
Balok 20/30
Balok 20/30
Ø 10 -15
Balok 15/25
Balok 15/25
160 Ø 10 -15 Wedi Hepri, A.md
Ø 10 -15
Ø 10 -15
Ahli Sipil
Balok 20/30
Balok 15/25 Sanoval, ST.
160 Diperiksa Oleh :
Team Leader:
DENAH BALOK DENAH BALOK LANTAI
Skala 1 : 50 Skala 1 : 50 DENAH PEMBESIAN PLAT LANTAI
Ali Al Shakhi, ST.
Skala 1 : 50
MENGETAHUI :
PPTK Perencanaan & Paraf :
Pengawasan
PPK Perencanaan & Paraf :
Pengawasan
Jln. Stadion Tunas Bangsa No. 01 Telp. (0645) 630037
Lhokseumawe
Kode Paket
Catatan :
Balok Lantai 20/30
Kolom 25/25
Kolom 25/25
2 Balok Gantung 15/25
Kegiatan
310 PENYEDIAAN PRASARANA DAN SARANA AIR MINUM
BAGI MASYARAKAT BERPENGHASILAN RENDAH
Pekerjaan
160 135 PEKERJAAN SUMUR BOR DALAM, RESERVOIR
DAN JARINGAN DISTRIBUSI
Kolom 25/25 Kolom 25/25
Lokasi
KECAMATAN BLANG BAND SAKTI
KOTA LHOKSEUMAWE
Sloof 20/30
JUDUL GAMBAR HALAMAN
1 DENAH PORTAL 1 : 25
POT. PORTAL 1 : 25
05
160
Penanggung Jawab :
A B 90
Konsultan Perencana
CV. BROTHER ENGINEERS
DENAH PORTAL ASROL, ST.MT
Direktur
Skala 1 : 25
160 Surveyor
A B Wedi Hepri, A.md
Ahli Sipil
PORTAL AS - 1
Skala 1 : 25
Sanoval, ST.
Diperiksa Oleh :
Team Leader:
Ali Al Shakhi, ST.
MENGETAHUI :
PPTK Perencanaan & Paraf :
Pengawasan
PPK Perencanaan & Paraf :
Pengawasan
Jln. Stadion Tunas Bangsa No. 01 Telp. (0645) 630037
Lhokseumawe
Kode Paket
TYPE BALOK BALOK SLOOF BALOK GANTUNG BALOK LANTAI Catatan :
AREA TUMPUAN LAPANGAN TUMPUAN LAPANGAN TUMPUAN LAPANGAN
12
MODEL
30 30 25 25 30 30
Kegiatan
15 15
20 20 20 20 PENYEDIAAN PRASARANA DAN SARANA AIR MINUM
BAGI MASYARAKAT BERPENGHASILAN RENDAH
Pekerjaan
TULANGAN BAWAH 2 Ø 12 2 Ø 12 2 Ø 12 2 Ø 12 2 Ø 12 2 Ø 12
PEKERJAAN SUMUR BOR DALAM, RESERVOIR
DAN JARINGAN DISTRIBUSI
TULANGAN ATAS 2 Ø 12 2 Ø 12 2 Ø 12 2 Ø 12 2 Ø 12 2 Ø 12 Lokasi
TULANGAN TENGAH 2 Ø 12 2 Ø 12 2 Ø 12 2 Ø 12 KECAMATAN BLANG BAND SAKTI
TULANGAN TROMOL 1 Ø 12 1 Ø 12 1 Ø 12 1 Ø 12 1 Ø 12 1 Ø 12 KOTA LHOKSEUMAWE
BEHEL Ø 8 - 100 Ø 8 - 150 Ø 8 - 100 Ø 8 - 150 Ø 8 - 100 Ø 8 - 150 JUDUL GAMBAR HALAMAN
TYPE BALOK KOLOM
TABEL PEMBESIAN 06
AREA
Penanggung Jawab :
Konsultan Perencana
CV. BROTHER ENGINEERS
MODEL
25
ASROL, ST.MT
Direktur
Surveyor
25
Wedi Hepri, A.md
TULANGAN BAWAH 3 Ø 14 Ahli Sipil
TULANGAN ATAS 3 Ø 14
TULANGAN TENGAH 2 Ø 14 Sanoval, ST.
TULANGAN TROMOL Diperiksa Oleh :
Team Leader:
BEHEL Ø 8 - 150
Ali Al Shakhi, ST.
MENGETAHUI :
PPTK Perencanaan & Paraf :
Pengawasan
PPK Perencanaan & Paraf :
Pengawasan
TARIKAN BESI Ø 12
PIPA HAWA GIP Ø 1"
40 TUTUP BETON
BERTULANG
6
Ø 10 - 12,5 40 PAS. BATA
TRASRAAM
KEDALAMAN SESUAI
15 ELEVASI SALURAN
PIPA PVC Ø 3"
10 80
5
2%
12,5 PERMUKAAN TANAH
30
40 2% 10 PASIR URUG
10 CM
DARI TOILET 12,5 12,5
35 20
PIPA PVC Ø 4" 25
KE PERESAPAN
25 10
PIPA PVC Ø 4" 50
POTONGAN IJUK T = 10 CM
60 PIPA PVC Ø 4"
PIPA PVC Ø3"
200
12,5 160 KERIKIL KASAR
( Ø 2 - 5 CM )
SUMURAN Ø 100 CM PAS. BATA
50 35 TRASRAAM 30 KERIKIL HALUS
( Ø 1 - 2 CM )
12,5
30 PASIR URUG
LANTAI KERJA 1 : 3 : 5 - 5 CM PIPA PVC Ø 3"
PASIR URUG 10 CM 10
12,5 35 12,5
5 50
10 60
DETAIL SEPTICTNAK 1 : 30
DENAH POTONGAN B - B DETAIL RESAPAN
DETAIL BAK KONTROL
1 : 30
1 : 30
100
SKALA 1 : 30
DETAIL BAK KONTROL
POTONGAN A - A 1 : 30
SKALA 1 : 30
IJUK 10 CM
TUTUP SEPTIC TANK B
PIPA HAWA GIP Ø 1" BETON BERTULANG KERIKIL DIA. 2 - 5 CM
TARIKAN BESI Ø 16 MM SUMURAN Ø 100 CM PVC Ø 4" DILUBANG-LUBANGI
10
A A
80 60
DARI TOILET KE PERESAPAN
PIPA PVC Ø 4" PIPA PVC Ø 4" DARI SEPTICTANK KE RIOL
PVC Ø 4"
10
100 10 380 10
DENAH SEPTIC TANK 400
SKALA 1 : 30
B DENAH BAK PERESAPAN
1 : 30
B C
500
250 110 140
E
KM/WC
160
160
- 0.05
D
K. TIDUR
± 0.00
350
350
A A
860
860
K. TIDUR
± 0.00
B
TERAS
80
80
- 0.05
A
250 250
500
1 2 3 4
B C
DENAH RENCANA
TAMPAK BELAKANG
2
TAMPAK SAMPING KANAN TAMPAK SAMPING KIRI
Rabung T=0,25 mm - 5 mm
Atap Spandek T=0,3 mm (Cat Pabrik)
C. 75 T = 0.60 mm
Reng ST 35 T = 0.40 mm
K1 K1 K1 K1 K1
+ 4.55 Atap+ 4.55
Atap
482
155
155
60 60
60 60
+ 3.00 + 3.00 60 60
15
15
Ring Balk Ring Balk
Elv. + 2.80 Elv. + 2.80 80
Elv. + 2.80 Elv. + 2.80 80
80 PLafond PVC PLafond PVC 80 PLafond PVC PLafond PVC
PLafond PVC
460
460
285
285
Pas. Keramik 40 x 40 cm
Lantai Cor
Pasir Urug
Lantai Keramik (40 x 40 cm) Lantai Keramik Beton Cor K-175 Tanah Urug Lantai Keramik (40 x 40 cm)
Lantai Keramik (40 x 40 cm)
± 0.00 Elv. ± 0.00 Elv. ± 0.00
± 0.00 Elv. ± 0.00
Elv. ± 0.00
5 30 21 5
5 30 21 5
Lantai Ruangan Muka Tanah
Lantai Ruangan
Muka Tanah
Elv. - 0.26 Elv. - 0.26
- 0.56 - 0.56
Galian Pondsasi Galian Pondsasi
270 270 80
250 250 750
1
500 A B C C
1 3 4
POTONGAN A - A POTONGAN B - B
3
Rabung T=0,25 mm - 5 mm
Atap Spandek T=0,3 mm (Cat Pabrik)
Reng ST 35 T = 0.40 mm
C. 75 T = 0.60 mm
C. 75 T = 0.60 mm
C. 75 T = 0.60 mm
A
480
155
B
620 60
60
C 60
15
Elv. + 2.80
PLafond PVC
Kanal C. 75 T = 0.60 mm
DETAIL KUDA-KUDATYPE 1
Reng ST 35 T = 0.40 mm
Rabung T=0,25 mm - 5 mm Bracket L
Atap Spandek T=0,3 mm (Cat Pabrik)
Reng ST 35 T = 0.40 mm Ring Balok
C. 75 T = 0.60 mm
C. 75 T = 0.60 mm
C. 75 T = 0.60 mm
482
60 60
60 60
60 60
ISOMETRI IKATAN KUDA-KUDA
80
Elv. + 2.80 Elv. + 2.80 80
PLafond PVC PLafond PVC
DETAIL KUDA-KUDATYPE 2
Rabung C.75 T = 0.60 mm C.75 T = 0.60 mm
Atap Spandek T = 03 mm (Cat Pabrik) Reng ST 35 T = 0.40 mm
Reng ST 35 T = 0.40 mm
C.75 T = 0.60 mm Screw
C.75 T = 0.60 mm Screw
C.75 T = 0.60 mm C.75 T = 0.60 mm
C.75 T = 0.60 mm Atap Zincalume (Cat Pabrik)
C.75 T = 0.60 mm
Reng ST 35 T = 0.40 mm
Screw
DynaBolt
Screw Ring Balk
DETAIL A DETAIL B DETAIL C DETAIL D
500
250 110 140
Plafon
75
PVC T = 6 mm
E
80
Plafon
160
PVC T = 6 mm
Plafon
PVC T = 6 mm D
D
350
Plafon
PVC T = 6 mm
350
PVC T = 6 mm
PVC T = 6 mm
860
Plafon
Plafon
700
C
Plafon
C PVC T = 6 mm
270
350
Plafon
PVC T = 6 mm
B
B
Plafon
80
PVC T = 6 mm A
A
80
Plafon
PVC T = 6 mm
75 250 250 75 75 250 250 75
500 500
1 2 3 4 1 2 3 4
DENAH PLAFOND TAMPAK ATAP
Rabung T=0,25 mm - 5 mm
Atap Spandek T=0,3 mm (Cat Pabrik)
Reng ST 35 T = 0.40 mm
C. 75 T = 0.60 mm A
+ 4.55
C. 75 T = 0.60 mm
Atap 500
C. 75 T = 0.60 mm
250 110 140
480
155
E
620 60 Sloof 15x20 cm
Sloof 15x20 cm
Sloof 15x20 cm
60
60 + 3.00
160
160
15
Ring Balk
Elv. + 2.80
PLafond PVC
461
D
54
Sloof 15x20 cm
Pas. Keramik 40 x 40 cm
Sloof 15x20 cm
Lantai Cor
Pasir Urug
350
Lantai Keramik (40 x 40 cm)
Tanah Urug
Lantai Keramik (40 x 40Beton
cm) Finish Acian
Elv. ± 0.00
Elv. ± 0.00 Elv. - 0.05 ± 0.00
5 30 21 5
Muka Tanah
Elv. - 0.26
Lantai
- 0.56
860
80 270 270 83
750
Sloof 15x20 cm
C C B A
700
C
POTONGAN C - C Sloof 15x20 cm
Pas. Bata
Sloof 15x20 cm
Sloof 15 x 20 cm
Sloof 15x20 cm
160 Tanah Timbun T = 20 cm
270
Pasir Urug T = 3 cm
Lantai Keramik 40 x 40 cm
70
Lantai Keramik
Elv. ± 0.00
Beton Cor Lantai Finis Acian
15
6
B
26
26
20
20
Tanah dasar
Elv. - 0.26
80
20 20 Sloof 15x20 cm
Pond. Rolag Bata
25
25
25
A
30
30
5
5
B
15 15
30 30
C
Pas. Batu Kali Pas. Batu Kali
Pasir Urug
POTONGAN - A Pasir Urug Pas. Bata
13 220
250 250
Sloof 15 x 20 cm
Tanah Timbun, t = 20 cm 500
18
13 Pasir Urug, t = 3 cm 1 2 3 4
Pas. Bata Lantai Cor, t = 3 cm
Sloof 15 x 20 cm Pas. Keramik 40 x 40 cm
Tanah Timbun T = 15 cm
Pasir Urug T = 3 Cm
Lantai Keramik (40 x 40 cm)
Lantai Cor , t = 3 cm Elv. ± 0.00
5
DENAH PONDASI & SLOOF
26
20
Lantai Keramik (40 x 40 cm)
Elv. ± 0.00 Beton Cor Lantai Finis Acian
Elv. - 0.05
6 5
6
20
25
26
25
30
20
15
5
3 10
20
25
25
15
30
30
20
30
Pas. Batu Kali
5
Pasir Urug
5
15
POTONGAN - B 30
POTONGAN - C
Pas. Batu Kali
Pasir Urug
PEMERINTAH KOTA LHOKSEUMAWE
DINAS PEKERJAAN UMUM
DAN PERUMAHAN RAKYAT
Jl. H. Ramli Ridwan No. 1 Telp (0645) 630037
LEMBAR PENGESAHAN
PERENCANAAN INSFRASTRUKTUR DASAR DAN PERUMAHAN
PERMUKIMAN SKALA KAWASAN ( HAGU, KP. JAWA DAN PUSONG )
LOKASI : KOTA LHOKSEUMAWE
Mengetahui : Di setujui : Dibuat / Diperiksa :
KEPALA DINAS PEKERJAAN UMUM KABID ENERGI, SUMBER DAYA MINERAL CV. BROTHER ENGINEERS
DAN PERUMAHAN RAKYAT DAN SUMBER DAYA AIR
KOTA LHOKSEUMAWE
SAFARUDDIN, ST, MT T. SYAHRIAL, ST ASROL, ST.MT
Pembina/NIP. 19740320 200604 1 008 Nip. 19820321 200504 1 002 Direktur
PEMERINTAH KOTA LHOKSEUMAWE
DINAS PEKERJAAN UMUM
DAN PERUMAHAN RAKYAT
Jl. H. Ramli Ridwan No. 1 Telp (0645) 630037
GAMBAR KERJA
PERENCANAAN INSFRASTRUKTUR DASAR DAN PERUMAHAN
PERMUKIMAN SKALA KAWASAN ( HAGU, KP. JAWA DAN PUSONG )
LOKASI : KOTA LHOKSEUMAWE
CV. BROTHER ENGINEERS
SITE PLAN RENCANA
SKALA 1 : 100
Gunding Block 30 x 30 cm
Beton Mutu Sedang fc' = 19,3 Mpa, K-225
T = 15 cm Finishing Grooving
Besi Beton Polos Ø 10 - 150 mm
Beton Mutu Rendah fc' = 15 Mpa, K-175 Lean Concreat K - 100, t = 5 cm
Beton Mutu Sedang fc' = 19,3 Mpa, K-225
Pasangan Batu Kali
Talud ( Pas Batu Kali )
Saluran Rencana
Geotextile Non Woven ( Pondasi Batu Kali )
Timbunan
Cerucuk Bambu
CROSS STA. 0 + 000
SKALA 1 : 100
Gunding Block 30 x 30 cm
Beton Mutu Sedang fc' = 19,3 Mpa, K-225
T = 15 cm Finishing Grooving
Besi Beton Polos Ø 10 - 150 mm
Beton Mutu Rendah fc' = 15 Mpa, K-175 Lean Concreat K - 100, t = 5 cm
Beton Mutu Sedang fc' = 19,3 Mpa, K-225
Pasangan Batu Kali
Talud ( Pas Batu Kali )
Saluran Rencana
Geotextile Non Woven ( Pondasi Batu Kali )
Timbunan
Cerucuk Bambu
CROSS STA. 0 + 100
SKALA 1 : 100
Gunding Block 30 x 30 cm
Beton Mutu Sedang fc' = 19,3 Mpa, K-225
T = 15 cm Finishing Grooving
Besi Beton Polos Ø 10 - 150 mm
Beton Mutu Rendah fc' = 15 Mpa, K-175 Lean Concreat K - 100, t = 5 cm
Beton Mutu Sedang fc' = 19,3 Mpa, K-225
Pasangan Batu Kali
Talud ( Pas Batu Kali )
Saluran Rencana
Geotextile Non Woven ( Pondasi Batu Kali )
Timbunan
Cerucuk Bambu
CROSS STA. 0 + 200
SKALA 1 : 100
Gunding Block 30 x 30 cm
Beton Mutu Sedang fc' = 19,3 Mpa, K-225
T = 15 cm Finishing Grooving
Besi Beton Polos Ø 10 - 150 mm
Beton Mutu Rendah fc' = 15 Mpa, K-175 Lean Concreat K - 100, t = 5 cm
Beton Mutu Sedang fc' = 19,3 Mpa, K-225
Pasangan Batu Kali
Talud ( Pas Batu Kali )
Saluran Rencana
Geotextile Non Woven ( Pondasi Batu Kali )
Timbunan
Cerucuk Bambu
CROSS STA. 0 + 300
SKALA 1 : 100
Gunding Block 30 x 30 cm
Beton Mutu Sedang fc' = 19,3 Mpa, K-225
T = 15 cm Finishing Grooving
Besi Beton Polos Ø 10 - 150 mm
Beton Mutu Rendah fc' = 15 Mpa, K-175 Lean Concreat K - 100, t = 5 cm
Beton Mutu Sedang fc' = 19,3 Mpa, K-225
Pasangan Batu Kali
Talud ( Pas Batu Kali )
Saluran Rencana
Geotextile Non Woven ( Pondasi Batu Kali )
Timbunan
Cerucuk Bambu
CROSS STA. 0 + 400
SKALA 1 : 100
Gunding Block 30 x 30 cm
Beton Mutu Sedang fc' = 19,3 Mpa, K-225
T = 15 cm Finishing Grooving
Besi Beton Polos Ø 10 - 150 mm
Beton Mutu Rendah fc' = 15 Mpa, K-175 Lean Concreat K - 100, t = 5 cm
Beton Mutu Sedang fc' = 19,3 Mpa, K-225
Pasangan Batu Kali
Talud ( Pas Batu Kali )
Saluran Rencana
Geotextile Non Woven ( Pondasi Batu Kali )
Timbunan
Cerucuk Bambu
CROSS STA. 0 + 500
SKALA 1 : 100
Gunding Block 30 x 30 cm
Beton Mutu Sedang fc' = 19,3 Mpa, K-225
T = 15 cm Finishing Grooving
Besi Beton Polos Ø 10 - 150 mm
Beton Mutu Rendah fc' = 15 Mpa, K-175 Lean Concreat K - 100, t = 5 cm
Beton Mutu Sedang fc' = 19,3 Mpa, K-225
Pasangan Batu Kali
Talud ( Pas Batu Kali )
Saluran Rencana
Geotextile Non Woven ( Pondasi Batu Kali )
Timbunan
Cerucuk Bambu
CROSS STA. 0 + 600
SKALA 1 : 100
Gunding Block 30 x 30 cm
Beton Mutu Sedang fc' = 19,3 Mpa, K-225
T = 15 cm Finishing Grooving
Besi Beton Polos Ø 10 - 150 mm
Beton Mutu Rendah fc' = 15 Mpa, K-175 Lean Concreat K - 100, t = 5 cm
Beton Mutu Sedang fc' = 19,3 Mpa, K-225
Pasangan Batu Kali
Talud ( Pas Batu Kali )
Saluran Rencana
Geotextile Non Woven ( Pondasi Batu Kali )
Timbunan
Cerucuk Bambu
CROSS STA. 0 + 700
SKALA 1 : 100
Gunding Block 30 x 30 cm
Beton Mutu Sedang fc' = 19,3 Mpa, K-225
T = 15 cm Finishing Grooving
Besi Beton Polos Ø 10 - 150 mm
Beton Mutu Rendah fc' = 15 Mpa, K-175 Lean Concreat K - 100, t = 5 cm
Beton Mutu Sedang fc' = 19,3 Mpa, K-225
Pasangan Batu Kali
Talud ( Pas Batu Kali )
Saluran Rencana
Geotextile Non Woven ( Pondasi Batu Kali )
Timbunan
Cerucuk Bambu
CROSS STA. 0 + 800
SKALA 1 : 100
Gunding Block 30 x 30 cm
Beton Mutu Sedang fc' = 19,3 Mpa, K-225
T = 15 cm Finishing Grooving
Besi Beton Polos Ø 10 - 150 mm
Beton Mutu Rendah fc' = 15 Mpa, K-175 Lean Concreat K - 100, t = 5 cm
Beton Mutu Sedang fc' = 19,3 Mpa, K-225
Pasangan Batu Kali
Talud ( Pas Batu Kali )
Saluran Rencana
Geotextile Non Woven ( Pondasi Batu Kali )
Timbunan
Cerucuk Bambu
CROSS STA. 0 + 900
SKALA 1 : 100
Gunding Block 30 x 30 cm
Beton Mutu Sedang fc' = 19,3 Mpa, K-225
T = 15 cm Finishing Grooving
Besi Beton Polos Ø 10 - 150 mm
Beton Mutu Rendah fc' = 15 Mpa, K-175 Lean Concreat K - 100, t = 5 cm
Beton Mutu Sedang fc' = 19,3 Mpa, K-225
Pasangan Batu Kali
Talud ( Pas Batu Kali )
Saluran Rencana
Geotextile Non Woven ( Pondasi Batu Kali )
Timbunan
Cerucuk Bambu
CROSS STA. 1 + 000
SKALA 1 : 100
Gunding Block 30 x 30 cm
Beton Mutu Sedang fc' = 19,3 Mpa, K-225
T = 15 cm Finishing Grooving
Besi Beton Polos Ø 10 - 150 mm
Beton Mutu Rendah fc' = 15 Mpa, K-175 Lean Concreat K - 100, t = 5 cm
Beton Mutu Sedang fc' = 19,3 Mpa, K-225
Pasangan Batu Kali
Talud ( Pas Batu Kali )
Saluran Rencana
Geotextile Non Woven ( Pondasi Batu Kali )
Timbunan
Cerucuk Bambu
CROSS STA. 1 + 100
SKALA 1 : 100
Gunding Block 30 x 30 cm
Beton Mutu Sedang fc' = 19,3 Mpa, K-225
T = 15 cm Finishing Grooving
Besi Beton Polos Ø 10 - 150 mm
Beton Mutu Rendah fc' = 15 Mpa, K-175 Lean Concreat K - 100, t = 5 cm
Beton Mutu Sedang fc' = 19,3 Mpa, K-225
Pasangan Batu Kali
Talud ( Pas Batu Kali )
Saluran Rencana
Geotextile Non Woven ( Pondasi Batu Kali )
Timbunan
Cerucuk Bambu
CROSS STA. 1 + 200
SKALA 1 : 100
Gunding Block 30 x 30 cm
Beton Mutu Sedang fc' = 19,3 Mpa, K-225
T = 15 cm Finishing Grooving
Besi Beton Polos Ø 10 - 150 mm
Beton Mutu Rendah fc' = 15 Mpa, K-175 Lean Concreat K - 100, t = 5 cm
Beton Mutu Sedang fc' = 19,3 Mpa, K-225
Pasangan Batu Kali
Talud ( Pas Batu Kali )
Saluran Rencana
Geotextile Non Woven ( Pondasi Batu Kali )
Timbunan
Cerucuk Bambu
CROSS STA. 0 + 300
SKALA 1 : 100
Gunding Block 30 x 30 cm
Beton Mutu Sedang fc' = 19,3 Mpa, K-225
T = 15 cm Finishing Grooving
Besi Beton Polos Ø 10 - 150 mm
Beton Mutu Rendah fc' = 15 Mpa, K-175 Lean Concreat K - 100, t = 5 cm
Beton Mutu Sedang fc' = 19,3 Mpa, K-225
Pasangan Batu Kali
Talud ( Pas Batu Kali )
Saluran Rencana
Geotextile Non Woven ( Pondasi Batu Kali )
Timbunan
Cerucuk Bambu
CROSS STA. 0 + 400
SKALA 1 : 100
Gunding Block 30 x 30 cm
Beton Mutu Sedang fc' = 19,3 Mpa, K-225
T = 15 cm Finishing Grooving
Besi Beton Polos Ø 10 - 150 mm
Beton Mutu Rendah fc' = 15 Mpa, K-175 Lean Concreat K - 100, t = 5 cm
Beton Mutu Sedang fc' = 19,3 Mpa, K-225
Pasangan Batu Kali
Talud ( Pas Batu Kali )
Saluran Rencana
Geotextile Non Woven ( Pondasi Batu Kali )
Timbunan
Cerucuk Bambu
CROSS STA. 0 + 500
SKALA 1 : 100