BILL OF QUANTITY ( BQ )
HARGA
NO. URAIAN PEKERJAAN
( Rp. )
I PEKERJAAN PERSIAPAN 81.633.420
KONSTRUKSI
II. RUMAH GENSET 217.177.809
III. PEKERJAAN RUANG SERVER 748.410.390
IV. PEKERJAAN LISTRIK 3.208.273.146
PENGADAAN DAN PEMASANGAN
A. PEKERJAAN PENDINGIN ALAT DAN RUANGAN 525.750.000
B. PEKERJAAN RACK CABINET 1.621.125.000
C. PEKERJAAN STRUCTURED CABLING 1.474.254.000
D. PEKERJAAN MONITORING DATACENTER 940.612.500
PENGADAAN DAN PEMASANGAN GENSET 150 KVA LENGKAP
E. 514.875.000
PENUNJANG DAN ASSESORIS
F. PEKERJAAN KABEL 159.546.000
Jumlah 9.491.657.264
PPN 11% 1.044.082.299
Jumlah Total 10.535.739.563
Dibulatkan 10.535.739.000