Anda di halaman 1dari 25

PROVINSI : SUMATERA UTARA

KABUPATEN : MANDAILING NATAL

RENCANA KERJA DAN ANGGARAN


( RKA )

PROGRAM PENINGKATAN SARANA DAN PRASARANA APARATUR


SUMBER DANA DAU
TAHUN ANGGARAN. 2012

Kegiatan : Pemasangan Tower Air Pada UPTD Kotanopan


Lokasi : Kecamatan Kotanopan
Jumlah Biaya : Rp 30,000,000.00
Err:511

DINAS PERTANIAN
KABUPATEN MANDAILING NATAL

CV. TUREDO SOLUSI KONSULTAN


DESIGN SURVEY STUDY KELAYAKAN DAN SUPERVISI
MEDAN SUMATERA UTARA
URAIAN DAFTAR KUANTITAS DAN HARGA

PROPINSI : SUMATERA UTARA


KABUPATEN : MANDAILING NATAL
PROGRAM : PENINGKATAN SARANA DAN PRASARANA APARATUR
KEGIATAN : PEMASANGAN TOWER AIR PADA UPTD KOTANOPAN
LOKASI : KEC. KOTANOPAN
TAHUN ANGGARAN : 2012

JUMLAH HARGA
No. URAIAN PEKERJAAN
( Rp. )

1 2 3

A. PEKERJAAN PENDAHULUAN 1,299,560.00


B. REHAB KANTOR
I. PEKERJAAN TANAH 283,443.00
II. PEKERJAAN COR BETON & PASANGAN 1,391,271.00
III. PEKERJAAN BESI 13,647,528.00
IV. PEKERJAAN CAT 4,473,569.00
V. PEKERJAAN PIPA DAN POMPA 6,177,357.00

JUMLAH TOTAL 27,272,728.00

A. JUMLAH HARGA PEKERJAAN ( A + B ) Rp 27,272,728.00


B. PPN ( 10 % * A ) Rp 2,727,272.80
C. TOTAL HARGA KEGIATAN ( A + B ) Rp 30,000,000.80
DIBULATKAN Rp 30,000,000.00

Terbilang : Err:511

Panyabungan, Maret 2012

PEJABAT PELAKSANA TEKNIS KEGIATAN CV. TUREDO SOLUSI KONSULTAN


DINAS PERTANIAN KABUPATEN MANDAILING NATAL

SIAR NASUTION, SP Ir. M. TURE SIBURIAN


NIP. 19650901 198803 1 004 Direktur

Diketahui :

KEPALA DINAS PERTANIAN KAB. MANDAILING NATAL


-

TAUFIK ZULHANDRA RITONGA, SP.MM


NIP. 19710216 199703 1 004
URAIAN DAFTAR KUANTITAS DAN HARGA
PROPINSI : SUMATERA UTARA
KABUPATEN : MANDAILING NATAL
PROGRAM : PENINGKATAN SARANA DAN PRASARANA APARATUR
KEGIATAN : PEMASANGAN TOWER AIR PADA UPTD KOTANOPAN
LOKASI : KEC. KOTANOPAN
TAHUN ANGGARAN : 2012

VOLUME HARGA SATUAN


JUMLAH HARGA
NO. URAIAN PEKERJAAN ANALISA
( Rp. )
( Rp. )
1 2 4 3 5 6

A. PEKERJAAN PENDAHULUAN
1 Biaya Papan Merek Proyek 1.00 Ls -- 350,000.00 350,000.00
2 Biaya Photo Dokumentasi 1.00 Ls -- 200,000.00 200,000.00
3 Pembersihan Lokasi 1.00 Ls -- 249,560.00 249,560.00
4 Pekerjaan Pengukuran 1.00 Ls -- 500,000.00 500,000.00
Jumlah 1,299,560.00

JUMLAH A 1,299,560.00

B. REHAB KANTOR
I. PEKERJAAN TANAH
1 Galian Tanah Tapak 0.94 M3 ANL. A.1 55,282.00 51,743.00
2 Galian Tanah Sumur 1.51 M3 ANL. A.4 110,565.00 166,643.00
3 Tanah Galian Sumur 1.51 M3 ANL. A.10 18,866.00 28,487.00
4 Tanah Dibuang Sejauh 30 M 1.51 M3 ANL. A.6 24,219.00 36,570.00
Jumlah 283,443.00

II. PEKERJAAN COR BETON & PASANGAN


1 Urugan Pasir 0.07 M3 ANL. A.18 173,327.00 12,132.00
2 Cor Tapak 1 : 2 : 3 1.01 M3 G. 41 1,365,485.00 1,379,139.00
Jumlah 1,391,271.00

III. PEKERJAAN BESI


1 Besi Siku 40 x 40 75.39 Kg ANL. I.2.C 57,680.00 4,348,495.00
2 Besi Siku 30 x 30 106.24 Kg ANL. I.2.D 46,726.00 4,964,170.00
3 Besi Bulat Ø 1,5 " 3.75 Kg ANL. I.2.B 37,512.00 140,670.00
4 Besi Plat 4' x 8' x t = 1,5 mm 20.72 Kg ANL. I.2.E 37,946.00 786,241.00
5 Baut Tiang 32.00 Bh Upah +Bahan 12,748.50 407,952.00
6 Pengelasan 400.00 Ttk Upah +Bahan 7,500.00 3,000,000.00
Jumlah 13,647,528.00

IV. PEKERJAAN CAT


1 Cat kilat 25.81 M2 ANL. A.18 173,327.00 4,473,569.00
Jumlah 4,473,569.00
1 2 4 3 5 6

V. PEKERJAAN PIPA DAN POMPA


1 Pipa PVC Ø 3/4 " 50.00 M1 ANL. PIPA 3/4 " 25,736.00 1,286,800.00
2 Asesories Pipa 1.00 Ls -- 150,000.00 150,000.00
3 Pompa Air 1.00 Set Upah +Bahan 450,554.00 450,554.00
4 Bak Air Fiber 1000 ltr 1.00 Set Upah +Bahan 3,290,003.60 3,290,003.00
5 Rumah Pompa 1.00 Ls -- 1,000,000.00 1,000,000.00
Jumlah 6,177,357.00

JUMLAH B 25,973,168.00

A. JUMLAH HARGA PEKERJAAN ( A + B ) Rp 27,272,728.00


B. PPN ( 10 % * A ) Rp 2,727,272.00
C. TOTAL HARGA KEGIATAN ( A + B ) Rp 30,000,000.00

Terbilang :###

Panyabungan, Maret 2012

Diperiksa dan disetujui : Disiapkan :

PEJABAT PELAKSANA TEKNIS KEGIATAN CV. TUREDO SOLUSI KONSULTAN


DINAS PERTANIAN KABUPATEN MANDAILING NATAL

SIAR NASUTION, SP Ir. M. TURE SIBURIAN


NIP. 19650901 198803 1 004 Direktur

Diketahui :

KEPALA DINAS PERTANIAN KAB. MANDAILING NATAL

TAUFIK ZULHANDRA RITONGA, SP.MM


NIP. 19710216 199703 1 004
DAFTAR ANALISA
PROPINSI : SUMATERA UTARA
KABUPATEN : MANDAILING NATAL
PROGRAM : PENINGKATAN SARANA DAN PRASARANA APARATUR
KEGIATAN : PEMASANGAN TOWER AIR PADA UPTD KOTANOPAN
LOKASI : KEC. KOTANOPAN
TAHUN ANGGARAN : 2012

ANL. A.1 1 M3 GALIAN TANAH BIASA

0.7500 Pekerja Terampil @Rp. 70,200.00 = Rp. 52,650.00


0.0250 Mandor @Rp. 105,300.00 = Rp. 2,632.50
Jumlah = Rp. 55,282.50
Di bulatkan = Rp. 55,282.00

1 M3 TIMBUN TANAH KEMBALI 1/4 ANL. A1 x 55,282.00 = Rp. 13,820.50


Di bulatkan = Rp. 13,820.00

ANL. A.4 1 M3 GALIAN TANAH LUMPUR

1.5000 Pekerja Terampil @Rp. 70,200.00 = Rp. 105,300.00


0.0500 Mandor @Rp. 105,300.00 = Rp. 5,265.00
Jumlah = Rp. 110,565.00
Di bulatkan = Rp. 110,565.00

1 M3 TIMBUN TANAH KEMBALI 1/4 ANL. A1 x 110,565.00 = Rp. 27,641.25


Di bulatkan = Rp. 27,641.00

ANL. A.10 1 M3 TANAH LUMPUR DIANGKAT DARI LUBANG LEBIH 1 M'

0.2500 Pekerja Terampil @Rp. 70,200.00 = Rp. 17,550.00


0.0125 Mandor @Rp. 105,300.00 = Rp. 1,316.25
Jumlah = Rp. 18,866.25
Di bulatkan = Rp. 18,866.00

ANL. A.6 1 M3 GALIAN TANAH DIANGKAT SEJAUH 30 M'

0.3300 Pekerja Terampil @Rp. 70,200.00 = Rp. 23,166.00


0.0100 Mandor @Rp. 105,300.00 = Rp. 1,053.00
Jumlah = Rp. 24,219.00
Di bulatkan = Rp. 24,219.00

ANL. A.18 1 M3 TIMBUNAN PASIR UNTUK ALAS LANTAI

1.2000 M3 Pasir Timbun @Rp. 126,012.00 = Rp. 151,214.40


0.3000 Pekerja @Rp. 70,200.00 = Rp. 21,060.00
0.0100 Mandor @Rp. 105,300.00 = Rp. 1,053.00
Jumlah = Rp. 173,327.40
Dibulatkan = Rp. 173,327.00

ANL. A.18a 1 M3 TIMBUNAN TANAH

1.2000 M3 Tanah Timbun @Rp. 124,670.00 = Rp. 149,604.00


0.3000 Pekerja @Rp. 70,200.00 = Rp. 21,060.00
0.0100 Mandor @Rp. 105,300.00 = Rp. 1,053.00
Jumlah = Rp. 171,717.00
Dibulatkan = Rp. 171,717.00
ANL. G. 32. h 1 M3 PASANGAN BATU KALI CAMP. 1 PC : 4 PC

1.2000 M3 Batu Kali @Rp. 126,012.00 = Rp. 151,214.40


3.2560 Zak PC @ 50 Kg @Rp. 84,695.00 = Rp. 275,766.92
0.5200 1 M3 Pasir Pasang @Rp. 159,440.00 = Rp. 82,908.80
1.2000 Tukang @Rp. 93,600.00 = Rp. 112,320.00
0.1200 Kepala Tukang @Rp. 117,000.00 = Rp. 14,040.00
3.6000 Pekerja @Rp. 70,200.00 = Rp. 252,720.00
0.1800 Mandor @Rp. 105,300.00 = Rp. 18,954.00
Jumlah = Rp. 907,924.12
Dibulatkan = Rp. 907,924.00

ANL. G. 33. h 1 M3 PASANGAN DINDING BATU CAMP. 1 PC : 4 PS

800.0000 Bh Batu Bata @Rp. 961.00 = Rp. 768,800.00


2.5330 Zak PC @ 50 Kg @Rp. 84,695.00 = Rp. 214,532.44
0.4060 1 M3 Pasir Pasang @Rp. 159,440.00 = Rp. 64,732.64
1.5000 Tukang @Rp. 93,600.00 = Rp. 140,400.00
0.1500 Kepala Tukang @Rp. 117,000.00 = Rp. 17,550.00
4.5000 Pekerja @Rp. 70,200.00 = Rp. 315,900.00
0.2250 Mandor @Rp. 105,300.00 = Rp. 23,692.50
Jumlah = Rp. 1,545,607.58
Dibulatkan = Rp. 1,545,607.00

ANL. G. 50.q 1 M2 PLESTERAN CAMP. 1 PC : 4PS

0.1428 Zak PC @ 50 Kg @Rp. 84,695.00 = Rp. 12,094.45


0.0114 1 M3 Pasir Pasang @Rp. 159,440.00 = Rp. 1,817.62
0.0150 Tukang @Rp. 93,600.00 = Rp. 1,404.00
0.0150 Kepala Tukang @Rp. 117,000.00 = Rp. 1,755.00
0.4000 Pekerja @Rp. 70,200.00 = Rp. 28,080.00
0.0200 Mandor @Rp. 105,300.00 = Rp. 2,106.00
Jumlah = Rp. 47,256.86
Dibulatkan = Rp. 47,256.00

ANL. G. 50.r 1 M2 ACIAN BETON

0.1000 Zak PC @ 50 Kg @Rp. 84,695.00 = Rp. 8,469.50


0.1000 Tukang @Rp. 93,600.00 = Rp. 9,360.00
0.0100 Kepala Tukang @Rp. 117,000.00 = Rp. 1,170.00
0.0500 Pekerja @Rp. 70,200.00 = Rp. 3,510.00
0.0100 Mandor @Rp. 105,300.00 = Rp. 1,053.00
Jumlah = Rp. 23,562.30
Dibulatkan = Rp. 23,562.00

ANL. G. 39 1 M3 COR LANTAI KERJA

1.0000 M3 Kerikil @Rp. 185,060.00 = Rp. 185,060.00


0.2470 Kapur Batu @Rp. 110,729.00 = Rp. 27,350.06
0.2470 Zak PC @ 50 Kg @Rp. 84,695.00 = Rp. 20,919.67
0.2470 1 M3 Pasir Pasang @Rp. 159,440.00 = Rp. 39,381.68
0.5000 Tukang @Rp. 93,600.00 = Rp. 46,800.00
0.0500 Kepala Tukang @Rp. 117,000.00 = Rp. 5,850.00
6.0000 Pekerja @Rp. 70,200.00 = Rp. 421,200.00
0.3000 Mandor @Rp. 105,300.00 = Rp. 31,590.00
Jumlah = Rp. 778,151.41
Dibulatkan = Rp. 778,151.00

G. 41 1 M3 BETON COR 1 : 2 : 3

0.8200 M3 Kerikil @Rp. 185,060.00 = Rp. 151,749.20


6.8000 Zak PC @ 50 Kg @Rp. 84,695.00 = Rp. 575,926.00
0.5000 1 M3 Pasir Pasang @Rp. 159,440.00 = Rp. 79,720.00
1.0000 Tukang @Rp. 93,600.00 = Rp. 93,600.00
0.1000 Kepala Tukang @Rp. 117,000.00 = Rp. 11,700.00
6.0000 Pekerja @Rp. 70,200.00 = Rp. 421,200.00
0.3000 Mandor @Rp. 105,300.00 = Rp. 31,590.00
Jumlah = Rp. 1,365,485.20
Dibulatkan = Rp. 1,365,485.00
ANL. G. 43.a 1 M3 BETON COR 1 : 3 : 5

0.9100 M3 Kerikil @Rp. 185,060.00 = Rp. 168,404.60


4.5400 Zak PC @ 50 Kg @Rp. 84,695.00 = Rp. 384,515.30
0.5400 1 M3 Pasir Pasang @Rp. 159,440.00 = Rp. 86,097.60
0.5000 Tukang @Rp. 93,600.00 = Rp. 46,800.00
0.0500 Kepala Tukang @Rp. 117,000.00 = Rp. 5,850.00
6.0000 Pekerja @Rp. 70,200.00 = Rp. 421,200.00
0.3000 Mandor @Rp. 105,300.00 = Rp. 31,590.00
Jumlah = Rp. 1,144,457.50
Dibulatkan = Rp. 1,144,457.00

I.2 MEMOTONG, MEMASANG DAN MENGERJAKAN BESI / 100 Kg

9.0000 Tukang @Rp. 93,600.00 = Rp. 842,400.00


3.0000 Kepala Tukang @Rp. 117,000.00 = Rp. 351,000.00
9.0000 Pekerja @Rp. 70,200.00 = Rp. 631,800.00
Jumlah = Rp. 1,825,200.00
0.5000 Upah @Rp. 1,825,200.00 = Rp. 912,600.00
110.0000 Kg. Besi Beton @Rp. 12,891.00 = Rp. 1,418,010.00
2.0000 Kg. Kawat Beton @Rp. 28,335.00 = Rp. 56,670.00
Jumlah = Rp. 2,387,280.00

Untuk 1 Kg Jumlah = Rp. 23,872.80


Dibulatkan = Rp. 23,872.00

F.8 10 M2 PAPAN BEKESTING

Ubah Cetakan / M2
0.5000 Tukang @Rp. 93,600.00 = Rp. 46,800.00
0.0500 Kepala Tukang @Rp. 117,000.00 = Rp. 5,850.00
0.2000 Pekerja @Rp. 70,200.00 = Rp. 14,040.00
0.0100 Mandor @Rp. 105,300.00 = Rp. 1,053.00
Jumlah = Rp. 67,743.00

Untuk 10 M2 = Rp. 677,430.00


4.0000 Kg. Paku @Rp. 23,187.00 = Rp. 92,748.00
0.4000 M3 Kayu K. III @Rp. 3,196,440.00 = Rp. 1,278,576.00
Jumlah = Rp. 2,048,754.00

Untuk 1 M2 Jumlah = Rp. 204,875.40


Dibulatkan = Rp. 204,875.00

ANL. I.2. 1 KG MEMBENGKOK DAN MEMOTONG Pipa Besi Uk. 1,5" T. 2 MM

1.1000 kg Pipa Besi Uk. 1,5" T. 2 MM @Rp. 17,508.70 =Rp. 19,259.58


0.0900 Tukang @Rp. 93,600.00 =Rp. 8,424.00
0.0300 Kepala tukang @Rp. 117,000.00 =Rp. 3,510.00
0.0900 Pekerja Terampil @Rp. 70,200.00 =Rp. 6,318.00
Jumlah =Rp. 37,511.58
Dibulatkan =Rp. 37,512.00

ANL. I.2. 1 KG MEMBENGKOK DAN MEMOTONGBESI SIKU 40 x 40 x4

1.1000 kg Besi Siku L 40 x 40 x 4 @Rp. 35,843.53 =Rp. 39,427.88


0.0900 Tukang @Rp. 93,600.00 =Rp. 8,424.00
0.0300 Kepala tukang @Rp. 117,000.00 =Rp. 3,510.00
0.0900 Pekerja Terampil @Rp. 70,200.00 =Rp. 6,318.00
Jumlah =Rp. 57,679.88
Dibulatkan =Rp. 57,680.00
ANL. I.2. 1 KG MEMBENGKOK DAN MEMOTONGBESI SIKU 30 x 30 x3

1.1000 kg Besi Siku L 30 x 30 x 3 @Rp. 25,885.87 =Rp. 28,474.45


0.0900 Tukang @Rp. 93,600.00 =Rp. 8,424.00
0.0300 Kepala tukang @Rp. 117,000.00 =Rp. 3,510.00
0.0900 Pekerja Terampil @Rp. 70,200.00 =Rp. 6,318.00
Jumlah =Rp. 46,726.45
Dibulatkan =Rp. 46,726.00

ANL. I.2. 1 KG MEMBENGKOK DAN MEMOTONGBESI PLAT 4' x 8' x t = 1,5 mm

1.1000 kg Plat 4' x 8' x t = 1,5 mm @Rp. 17,903.61 =Rp. 19,693.97


0.0900 Tukang @Rp. 93,600.00 =Rp. 8,424.00
0.0300 Kepala tukang @Rp. 117,000.00 =Rp. 3,510.00
0.0900 Pekerja Terampil @Rp. 70,200.00 =Rp. 6,318.00
Jumlah =Rp. 37,945.97
Dibulatkan =Rp. 37,946.00

ANL. K. 23 + K.9 10 M2 MENGECAT 3 KALI ( 1 KALI CAT DASAR + 2 KALI CAT WARNA )

0.7500 Tukang @Rp. 93,600.00 = Rp. 70,200.00


0.0750 Kepala Tukang @Rp. 117,000.00 = Rp. 8,775.00
0.5000 Pekerja @Rp. 70,200.00 = Rp. 35,100.00
0.0250 Mandor @Rp. 105,300.00 = Rp. 2,632.50
1.4850 Ltr. Thinner @Rp. 20,496.00 = Rp. 30,436.56
4.2500 Kg. Cat Warna @Rp. 57,936.00 = Rp. 246,228.00
Jumlah = Rp. 393,372.06
Dibulatkan = Rp. 393,372.00

Untuk 1 M2 = 1/10 x Rp. 393,372.00 = Rp. 39,337.20


Dibulatkan = Rp. 39,337.00

ANL. K. 23 10 M2 MENGECAT 3 KALI DENGAN CAT TEMBOK

0.7500 Tukang @Rp. 93,600.00 = Rp. 70,200.00


0.0750 Kepala Tukang @Rp. 117,000.00 = Rp. 8,775.00
0.5000 Pekerja @Rp. 70,200.00 = Rp. 35,100.00
0.0250 Mandor @Rp. 105,300.00 = Rp. 2,632.50
4.2500 Kg. Cat Tembok @Rp. 25,761.00 = Rp. 109,484.25
Jumlah = Rp. 226,191.75
Dibulatkan = Rp. 226,191.00

Untuk 1 M2 = 1/10 x Rp. 226,191.00 = Rp. 22,619.10


Dibulatkan = Rp. 22,619.00

ANL. PIPA 3/4 " 1 m' Pengadaan dan pemasangan pipa PVC dia 3/4 "
0.1200 Pekerja @Rp. 70,200.00 = 8,424.00
0.0400 Tukang pipa @Rp. 93,600.00 = 3,744.00
0.0200 Kepala Tukang @Rp. 117,000.00 = 2,340.00
0.0100 Mandor @Rp. 105,300.00 = 1,053.00
1.0000 Pipa pvc dia 3/4" @Rp. 9,033.33 = 9,033.33
0.0200 kg lem @Rp. 12,864.00 = 257.28
- bh sock @Rp. 0 = -
0.1250 lbr kertas gosok @Rp. 7,079.00 = 884.88
Jumlah = 25,736.49
Dibulatkan = 25,736.00
DAFTAR PERHITUNGAN VOLUME BAHAN

PROPINSI : SUMATERA UTARA


KABUPATEN : MANDAILING NATAL
PROGRAM : PENINGKATAN SARANA DAN PRASARANA APARATUR
KEGIATAN : PEMASANGAN TOWER AIR PADA UPTD KOTANOPAN
LOKASI : KEC. KOTANOPAN
TAHUN ANGGARAN : 2012

A. PEKERJAAN TOWER
I. PEKERJAAN TANAH
Galian Tanah
4 pt Galian Tanah Tapak Ukuran 0.60 x 0.60 x 0.65 = 0.94 M3
1 pt Galian Tanah Sumur Ukuran 3.14 x 0.16 x 3.00 = 1.51 M3
Jumlah = 2.44 M3
Dibulatkan = 2.44 M3

Tanah Galian Sumur


1 pt Galian Tanah Sumur Ukuran 3.14 x 0.16 x 3.00 = 1.51 M3
Jumlah = 1.51 M3
Dibulatkan = 1.51 M3

II. PEKERJAAN COR BETON & PASANGAN

Urugan Pasir
4 pt Timbunan Pasir Bawah Pondasi Ukuran 0.05 x 0.60 x 0.60 = 0.07 M3
Jumlah = 0.07 M3
Dibulatkan = 0.07 M3

Cor Tapak 1 : 2 : 3
4 pt Cor Tapak 1 : 2 : 3 Ukuran 0.70 x 0.60 x 0.60 = 1.01 M3
Jumlah = 1.01 M3
Dibulatkan = 1.01 M3

III. PEKERJAAN BESI

Pekerjaan Besi Siku


4 pt Besi Siku 40 x 40 Ukuran 1.00 x 4.35 x 1.41 = 24.56 Kg
24 pt Besi Siku 40 x 40 Ukuran 1.00 x 1.50 x 1.41 = 50.82 Kg
Jumlah = 75.39 Kg
Dibulatkan = 75.39 Kg

8 pt Besi Siku 30 x 30 Ukuran 1.00 x 1.90 x 1.60 = 24.32 Kg


8 pt Besi Siku 30 x 30 Ukuran 1.00 x 1.75 x 1.60 = 22.40 Kg
8 pt Besi Siku 30 x 30 Ukuran 1.00 x 1.65 x 1.60 = 21.12 Kg
8 pt Besi Siku 30 x 30 Ukuran 1.00 x 1.55 x 1.60 = 19.84 Kg
8 pt Besi Siku 30 x 30 Ukuran 1.00 x 1.45 x 1.60 = 18.56 Kg
Jumlah = 106.24 Kg
Dibulatkan = 106.24 Kg

1 pt Besi Bulat Ø 1,5 " Ukuran 2.00 x 3.14 x 1.20 x 0.42 = 3.17 Kg
4 pt Besi Bulat Ø 1,5 " Ukuran 1.00 x 1.00 x 0.35 x 0.42 = 0.59 Kg
Jumlah = 3.75 Kg
Dibulatkan = 3.75 Kg

4 pt Besi Plat 4' x 8' x t = 1,5 mm Ukuran 0.40 x 0.40 x 13.46 x 1.00 = 8.61 Kg
40 pt Besi Plat 4' x 8' x t = 1,5 mm Ukuran 0.15 x 0.15 x 13.46 x 1.00 = 12.11 Kg
Jumlah = 20.72 Kg
Dibulatkan = 20.72 Kg

32 pt Baut Tiang Ukuran 1.00 x 1.00 x 1.00 x 1.00 = 32.00 Bh


Jumlah = 32.00 Bh
Dibulatkan = 32.00 Bh
1 pt Pengelasan Ukuran 400.00 x 1.00 x 1.00 x 1.00 = 400.00 Ttk
` Jumlah = 400.00 Ttk
Dibulatkan = 400.00 Ttk

IV. PEKERJAAN CAT


Cat kilat
4 pt Besi Siku 40 x 40 Ukuran 0.20 x 4.35 = 3.48 M2
24 pt Besi Siku 40 x 40 Ukuran 0.20 x 1.50 = 7.20 M2
8 pt Besi Siku 30 x 30 Ukuran 0.16 x 1.90 = 2.43 M2
8 pt Besi Siku 30 x 30 Ukuran 0.16 x 1.75 = 2.24 M2
8 pt Besi Siku 30 x 30 Ukuran 0.16 x 1.65 = 2.11 M2
8 pt Besi Siku 30 x 30 Ukuran 0.16 x 1.55 = 1.98 M2
8 pt Besi Siku 30 x 30 Ukuran 0.16 x 1.45 = 1.86 M2
1 pt Besi Bulat Ø 1,5 " Ukuran 0.16 x 7.54 = 1.21 M2
4 pt Besi Bulat Ø 1,5 " Ukuran 0.16 x 0.35 = 0.22 M2
1 pt Besi Plat 4' x 8' x t = 1,5 mm Ukuran 4.00 x 0.32 = 1.28 M2
1 pt Besi Plat 4' x 8' x t = 1,5 mm Ukuran 40.00 x 0.05 = 1.80 M2
` Jumlah = 25.81 M2
Dibulatkan = 25.81 M2

V. PEKERJAAN PIPA DAN POMPA


Pipa PVC Ø 3/4 "
1 pt Pipa PVC Ø 3/4 " Ukuran 50.00 x 1.00 = 50.00 M1
Jumlah = 50.00 M1
Dibulatkan = 50.00 M1
Pompa Air
1 pt Pompa Air Ukuran 1.00 x 1.00 = 1.00 Bh
Jumlah = 1.00 Bh

Bak Air Fiber 1000 ltr


1 pt Bak Air Fiber 1000 ltr Ukuran 1.00 x 1.00 = 1.00 Set
Jumlah = 1.00 Set
Dibulatkan = 1.00 Set

Panyabungan, Maret 2012

Diperiksa Oleh : Dihitung Oleh :

CV. TUREDO SOLUSI KONSULTAN CV. TUREDO SOLUSI KONSULTAN

Ir. M. TURE SIBURIAN Ir. JAMILAM SARAGIH


Team Leader Cost Estimator
DAFTAR UPAH KERJA / HARI

PROPINSI : SUMATERA UTARA


KABUPATEN : MANDAILING NATAL
PROGRAM : PENINGKATAN SARANA DAN PRASARANA APARATUR
KEGIATAN : PEMASANGAN TOWER AIR PADA UPTD KOTANOPAN
LOKASI : KEC. KOTANOPAN
TAHUN ANGGARAN : 2012

HARGA SATUAN
KODE JUMLAH HARGA
NO. KEAHLIAN UPAH / JAM KETERANGAN
ANALISA JAM / HARI ( Rp )
( Rp. )
1 2 3 4 5 6 7

1 L 061 Mandor 7 15,042.86 105,300.00 7 Jam / Hari


2 L 073 Kepala Tukang 7 16,714.29 117,000.00 7 Jam / Hari
3 L 079 Tukang 7 13,371.43 93,600.00 7 Jam / Hari
4 L 106 Pekerja Terampil 7 10,028.57 70,200.00 7 Jam / Hari
5 L 103 Pekerja Semi Terampil 7 9,192.86 64,350.00 7 Jam / Hari
6 L 101 Pekerja Tidak Terampil 7 8,357.14 58,500.00 7 Jam / Hari
7 L 081 Operator Terlatih 7 16,714.29 117,000.00 7 Jam / Hari
8 L 082 Operator Semi Terlatih 7 15,878.57 111,150.00 7 Jam / Hari
10 L 083 Pembantu Operator 7 13,371.43 93,600.00 7 Jam / Hari
10 L 091 Supir Terampil 7 13,371.43 93,600.00 7 Jam / Hari
11 L 099 Pembantu Supir 7 10,028.57 70,200.00 7 Jam / Hari

Panyabungan, Maret 2012

Diperiksa Oleh : Dibuat Oleh :

CV. TUREDO SOLUSI KONSULTAN CV. TUREDO SOLUSI KONSULTAN

Ir. M. TURE SIBURIAN Ir. JAMILAM SARAGIH


Team Leader Cost Estimator
DAFTAR HARGA BAHAN BANGUNAN

PROPINSI : SUMATERA UTARA


KABUPATEN : MANDAILING NATAL
PROGRAM : PENINGKATAN SARANA DAN PRASARANA APARATUR
KEGIATAN : PEMASANGAN TOWER AIR PADA UPTD KOTANOPAN
LOKASI : KEC. KOTANOPAN
TAHUN ANGGARAN : 2012

NO. JENIS MATERIAL SPESIFIKASI SATUAN HARGA DI LOKASI

a b c d f

1 PASIR & BATU PASIR


Pasir Pasang M3 Rp. 159,440.00
Pasir Timbun M3 Rp. 126,012.00
Tanah Timbun M3 Rp. 124,670.00
Sirtu M3 Rp. 147,240.00

BATU
Batu Kerikil M3 Rp. 185,060.00
Batu Kerikil Sungai Royalti M3 Rp. 148,156.00
Batu Kali Bulat M3 Rp. 126,012.00
Batu Koral ( 2 - 3 Cm ) M3 Rp. 170,298.00
Batu Pecah ( 1 - 2 Cm ) M3 Rp. 554,110.00
Batu Pecah ( 2 - 3 Cm ) M3 Rp. 554,110.00
Batu Pecah ( 3 - 5 Cm ) M3 Rp. 517,206.00
Batu Pecah ( 5 - 7 Cm ) M3 Rp. 332,680.00
Batu Belah ( 10 - 15 Cm ) M3 Rp. 199,822.00

BATU CETAKAN
Batu Bata ( 4,5X9X18 ) Bh Rp. 961.00
Paving Blok Lokal
- Type Gergaji (45/M2) Bh Rp. 2,267.00
- Type Bata (45/M2) Bh Rp. 2,267.00
- Type Tiga Berlian (45/M2) Bh Rp. 2,267.00
- Type Segi Enam (42/M2) Bh Rp. 2,267.00
Paving Blok Mutu K. 175 Bh Rp. 4,503.00

BETON CETAK
Batu Kerawang 20 x 20 CM Bh Rp. 7,764.00
Batu Kerawang 13 x 20 CM Bh Rp. 7,764.00
Riol Uk 1/2 x 15 CM Bh Rp. 15,441.00
Riol Uk 1/2 x 20 CM Bh Rp. 18,893.00
Riol Uk. 10 CM Bh Rp. 18,569.00
Riol Uk. 15 CM Bh Rp. 26,760.00
Riol Uk. 20 CM Bh Rp. 33,151.00
Riol Uk. 25 CM Bh Rp. 52,478.00
Riol Uk. 30 CM Bh Rp. 60,392.00
Riol Uk. 40 CM Bh Rp. 112,658.00
Riol Uk. 50 CM Bh Rp. 147,612.00
Riol Uk. 60 CM Bh Rp. 175,234.00
Riol Uk. 70 CM Bh Rp. 210,246.00

2 SEMEN & KAPUR Semen PC. @ 40 Kg Zak Rp. 67,756.00


Semen PC. @ 50 Kg Zak Rp. 84,695.00
Semen Putih Kg Rp. 7,100.00
Kapur Aduk ( 20 Kg ) Kg Rp. 110,729.00
a b c d f

3 BESI BETON & PROFIL BESI BETON


Besi Beton Kiloan Kg Rp. 12,891.00
Besi Beton Ulir Kg Rp. 21,771.00

BESI PROFIL
Besi Profil Kiloan Kg Rp. 35,696.00
Besi Siku L 30 x 30 x 3 Btg Rp. 97,072.00
Besi Siku L 40 x 40 x 4 Btg Rp. 152,335.00
Besi Siku L 50 x 50 x 5 Btg Rp. 280,552.00
Besi Siku L 60 x 60 x 6 Btg Rp. 432,463.00

BESI PLAT STRIP


Besi Strip 4 x 19 mm P. 3,4 m Btg Rp. 67.00
Besi Strip 4 x 25 mm P. 3,4 m Btg Rp. 166.00
Besi Strip 4 x 32 mm P. 3,4 m Btg Rp. 175.00
Besi Strip 4 x 38 mm P. 5,7 m Btg Rp. 316.00

BESI PLAT
Plat 4' x 8' x t = 1,2 mm Lbr Rp. 409,268.00
Plat 4' x 8' x t = 1,5 mm Lbr Rp. 693,907.00
Plat 4' x 8' x t = 4 mm Lbr Rp. 1,488,097.00
Plat 4' x 8' x t = 6 mm Lbr Rp. 2,942,149.00
Plat 4' x 8' x t = 10 mm Lbr Rp. 4,958,981.00

ALUMINIUM PLAT
Plat 4' x 8' x t = 0,3 mm Lbr Rp. 118,567.00
Plat 4' x 8' x t = 0,4 mm Lbr Rp. 177,652.00
Plat 4' x 8' x t = 0,5 mm Lbr Rp. 236,866.00
Plat 4' x 8' x t = 0,6 mm Lbr Rp. 296,079.00
Plat 4' x 8' x t = 0,7 mm Lbr Rp. 325,690.00
Plat 4' x 8' x t = 0,8 mm Lbr Rp. 384,905.00
Plat 4' x 8' x t = 0,9 mm Lbr Rp. 444,119.00
Plat 4' x 8' x t = 1,0 mm Lbr Rp. 814,144.00

SENG PLAT
Plat 3' x 6' x t = 0,2 mm Lbr Rp. 69,556.00
Plat 3' x 6' x t = 0,25 mm Lbr Rp. 83,471.00
Plat 3' x 6' x t = 0,3 mm Lbr Rp. 92,780.00
Plat 3' x 6' x t = 0,35 mm Lbr Rp. 115,965.00
Plat 3' x 6' x t = 0,4 mm Lbr Rp. 173,257.00

PIPA PVC TYPE AW


Uk. 1/2" M1 Rp. 38,616.00
Uk. 3/4" M1 Rp. 51,490.00
Uk. 1" M1 Rp. 70,800.00
Uk. 1 1/4" M1 Rp. 102,979.00
Uk. 1 1/2" M1 Rp. 122,288.00
Uk. 2" M1 Rp. 154,471.00
Uk. 2 1/2" M1 Rp. 225,269.00
Uk. 3" M1 Rp. 257,462.00
Uk. 4" M1 Rp. 482,737.00

PIPA GALVANIS PUTIH


Uk. 3/4" Btg Rp. 34,387.00
Uk. 1 " Btg Rp. 52,884.00
Uk. 1 1/4" T. 2.4 Btg Rp. 67,325.00
Uk. 1 1/2" T. 2.4 Btg Rp. 76,435.00
Uk. 2" T. 2.4 Btg Rp. 107,141.00
a b c d f
Uk. 2 1/2" T. 2.4 Btg Rp. 137,342.00
Uk. 3" T. 2.4 Btg Rp. 179,531.00
Uk. 4" T. 2.4 Btg Rp. 258,440.00

PIPA BESI HITAM


Uk. 1/2" T. 2 MM Btg Rp. 131,514.00
Uk. 3/4" T. 2 MM Btg Rp. 154,716.00
Uk. 1" T. 2 MM Btg Rp. 208,734.00
Uk. 1 1/4" T. 2 MM Btg Rp. 231,937.00
Uk. 1 1/2" T. 2 MM Btg Rp. 247,398.00
Uk. 2" T. 2 MM Btg Rp. 278,340.00
Uk. 2 1/2" T. 2 MM Btg Rp. 371,102.00
Uk. 3" T. 2 MM Btg Rp. 463,914.00
Uk. 4" T. 2 MM Btg Rp. 618,503.00

PIPA STAINLES STEEL


Uk. Ø 2 " Btg Rp. 578.00
Uk. Ø 1 " Btg Rp. 211.00
Uk. Ø 3/4 " Btg Rp. 161.00

PIPA HOLLOW
Uk. 25 x 25 mm x 5,7 m Btg Rp. 111.00
Uk. 30 x 30 mm x 5,7 m Btg Rp. 147.00
Uk. 40 x 40 mm x 5,7 m Btg Rp. 240.00
Uk. 50 x 50 mm x 5,7 m Btg Rp. 277.00
Uk. 60 x 60 mm x 5,7 m Btg Rp. 294.00
Uk. 30 x 60 mm x 5,7 m Btg Rp. 348.00

BESI PAGAR KW. 2


Besi Pagar T.90 CM , L. 2,4 M Set Rp. 250.00
Besi Pagar T.120 CM , L. 2,4 M Set Rp. 312.00
Tiang Pagar T. 175 Bh Rp. 21.00
Penutup Tiang Bh Rp. -
Baut + Mor pengunci Set Rp. -

4 PAKU & PISHER Paku Biasa Kg Rp. 23,187.00


Paku Seng (100 Bh/Ktk) Ktk Rp. 38,641.00
Paku Asbes Gelombang (Paku Ulir) Kg Rp. 49,140.00
Paku Beton Ktk Rp. 25,750.00
Paku Lintah Ktk Rp. 32,690.00
Pisher (S 8) Bh Rp. 2,226.00
Pisher (S 10) Bh Rp. 2,594.00
Pisher (S 12) Bh Rp. 2,960.00

5 ANGKER & BAUT Anker Baut Ø 20 MM Bh Rp. 4,634.00


Baut Ø 0,5" - 0,5" Bh Rp. 1,417.00
Baut Ø 0,5" - 1" Bh Rp. 1,841.00
Baut Ø 0,5" - 1,5" Bh Rp. 2,382.00
Baut Ø 0,5" - 2" Bh Rp. 2,549.00
Baut Ø 0,5" - 2,5" Bh Rp. 2,871.00
Baut Ø 0,5" - 3" Bh Rp. 3,258.00
Baut Ø 0,5" - 3,5" Bh Rp. 3,413.00
Baut Ø 0,5" - 4" Bh Rp. 3,683.00
Baut Ø 0,5" - 4,5" Bh Rp. 3,966.00
Baut Ø 0,5" - 5" Bh Rp. 4,250.00
Baut Ø 0,5" - 5,5" Bh Rp. 4,701.00
Baut Ø 0,5" - 6" Bh Rp. 4,816.00
Baut Ø 0,5" - 7" Bh Rp. 5,667.00
Baut Ø 0,5" - 8" Bh Rp. 6,375.00
a b c d f
Baut Ø 0,5" - 9" Bh Rp. 6,800.00
Baut Ø 0,5" - 10" Bh Rp. 8,216.00
Baut Ø 0,5" - 11" Bh Rp. 8,499.00

6 KAWAT Beton Kg Rp. 28,335.00


Bronjong Kg Rp. 828,206.00
Duri Lokal (70 M) Glg Rp. 134,679.00
Nyamuk Lokal M2 Rp. 28,324.00
Harmonika M2 Rp. 35,403.00

13 CAT Kilat Kg Rp. 57,936.00


Perak Kg Rp. 64,371.00
Tembok Kg Rp. 25,761.00
Pernis Klng Rp. 45,066.00
Serlak Btl Rp. 32,192.00
Anti Rembes Kg Rp. 59,223.00
Menie Kg Rp. 25,761.00
Thinner Ltr Rp. 20,496.00

15 BAHAN ELEKTRIKAL LAMPU


Lampu Pijar 25 Watt Set Rp. 5,854.00
Lampu Pijar 40 Watt Set Rp. 7,037.00
TL IB2 x 20 cm Set Rp. 180,222.00
TL IB 2 x 40 cm Set Rp. 225,273.00
TL 20 Watt Set Rp. 31,315.00
TL 40 Watt Set Rp. 77,239.00
TL Bambu 20 Watt Set Rp. 122,275.00
TL Bambu 40 Watt Set Rp. 135,152.00
PLC 18 Watt Set Rp. 36,040.00
PLC 24 Watt Set Rp. 44,070.00
PLC 32 Watt Set Rp. 52,334.00
PLC 60 Watt Set Rp. 96,400.00
DL PLC 18 Watt Set Rp. 100,396.00

PANEL & POMPA AIR


Panel Kontrol (40x50x20) + Acc Set Rp. 2,316,704.00
Pompa Air Set Rp. 450,554.00
Exosphan 14" Set Rp. 450,512.00
Kipas Angin Type 56 CM Set Rp. 225,298.00
(Panasonic)
Bak Air Fiber 1000 ltr Set Rp. 2,530,772.00

Panyabungan, Maret 2012

Diperiksa Oleh : Dibuat Oleh :

CV. TUREDO SOLUSI KONSULTAN CV. TUREDO SOLUSI KONSULTAN

Ir. M. TURE SIBURIAN Ir. JAMILAM SARAGIH


a b c d f
Team Leader Cost Estimator
DAFTAR HARGA BAHAN BANGUNAN
PROPINSI : SUMATERA UTARA
KABUPATEN : MANDAILING NATAL
PROGRAM : PENINGKATAN SARANA DAN PRASARANA APARATUR
KEGIATAN : PEMASANGAN TOWER AIR PADA UPTD KOTANOPAN
LOKASI : KEC. KOTANOPAN
TAHUN ANGGARAN : 2012

HARGA PASAR / BIAYA ANGKUT & BONGKAR MUAT


DASAR / FAKTOR BIAYA
PAJAK RESTRIBUSI BIAYA
TANGKAHAN INFLASI 7% KEUNTUNGAN BONGKAR TOTAL
NO. JENIS MATERIAL SPESIFIKASI SAT. (PERDA) 5 % ANGKUT
10% JUMLAH MUAT
WAKTU /
JARAK DARI QUARRY KELOKASI BERAT
JENIS
( KM ) TRIP
TRIP
(Rp.) (Rp.) (Rp.) (Rp.) AB AP T/S TH ( JAM ) ( KG ) (Rp.) (Rp.) (Rp.)
1 2 3 4 5 9 10 11 12 13 14 15 16 17 18 19

1 PASIR & BATU PASIR


Pasir Pasang M3 100,000.00 5,000.00 7,000.00 10,000.00 3.00 - - - 1.12 4.00 - 37,440.00 159,440.00
Pasir Timbun M3 72,600.00 3,630.00 5,082.00 7,260.00 3.00 - - - 1.12 4.00 - 37,440.00 126,012.00
Tanah Timbun M3 71,500.00 3,575.00 5,005.00 7,150.00 3.00 - - - 1.12 4.00 - 37,440.00 124,670.00
Sirtu M3 90,000.00 4,500.00 6,300.00 9,000.00 3.00 - - - 1.12 4.00 - 37,440.00 147,240.00
BATU
Batu Kerikil M 3
121,000.00 6,050.00 8,470.00 12,100.00 3.00 - - - 1.12 4.00 - 37,440.00 185,060.00
Batu Kerikil Sungai Royalti M3 90,750.00 4,538.00 6,353.00 9,075.00 3.00 - - - 1.12 4.00 - 37,440.00 148,156.00
Batu Kali Bulat M3 72,600.00 3,630.00 5,082.00 7,260.00 3.00 - - - 1.12 4.00 - 37,440.00 126,012.00
Batu Koral ( 2 - 3 Cm ) M3 108,900.00 5,445.00 7,623.00 10,890.00 3.00 - - - 1.12 4.00 - 37,440.00 170,298.00
Batu Pecah ( 1 - 2 Cm ) M 3
423,500.00 21,175.00 29,645.00 42,350.00 3.00 - - - 1.12 4.00 - 37,440.00 554,110.00
Batu Pecah ( 2 - 3 Cm ) M 3
423,500.00 21,175.00 29,645.00 42,350.00 3.00 - - - 1.12 4.00 - 37,440.00 554,110.00
Batu Pecah ( 3 - 5 Cm ) M3 393,250.00 19,663.00 27,528.00 39,325.00 3.00 - - - 1.12 4.00 - 37,440.00 517,206.00
Batu Pecah ( 5 - 7 Cm ) M3 242,000.00 12,100.00 16,940.00 24,200.00 3.00 - - - 1.12 4.00 - 37,440.00 332,680.00
Batu Belah ( 10 - 15 Cm ) M 3
133,100.00 6,655.00 9,317.00 13,310.00 3.00 - - - 1.12 4.00 - 37,440.00 199,822.00
BATU CETAKAN
Batu Bata ( 4,5X9X18 ) Bh 800.00 56.00 80.00 3.00 - - - 1.12 4.00 1.20 - 24.96 961.00
Paving Blok Lokal
- Type Gergaji (45/M2) Bh 1,898.00 133.00 190.00 3.00 - - - 1.12 4.00 2.20 - 45.76 2,267.00
- Type Bata (45/M2) Bh 1,898.00 133.00 190.00 3.00 - - - 1.12 4.00 2.20 - 45.76 2,267.00
- Type Tiga Berlian (45/M2) Bh 1,898.00 133.00 190.00 3.00 - - - 1.12 4.00 2.20 - 45.76 2,267.00
- Type Segi Enam (42/M2) Bh 1,898.00 133.00 190.00 3.00 - - - 1.12 4.00 2.20 - 45.76 2,267.00
Paving Blok Mutu K. 175 Bh 3,795.00 266.00 380.00 3.00 - - - 1.12 4.00 3.00 - 62.40 4,503.00
BETON CETAK
Batu Kerawang 20 x 20 CM Bh 6,600.00 462.00 660.00 3.00 - - - 1.12 4.00 2.00 - 41.60 7,764.00
Batu Kerawang 13 x 20 CM Bh 6,600.00 462.00 660.00 3.00 - - - 1.12 4.00 2.00 - 41.60 7,764.00
Riol Uk 1/2 x 15 CM Bh 12,870.00 901.00 1,287.00 3.00 - - - 1.12 4.00 18.40 - 382.72 15,441.00
Riol Uk 1/2 x 20 CM Bh 15,730.00 1,101.00 1,573.00 3.00 - - - 1.12 4.00 23.50 - 488.80 18,893.00
Riol Uk. 10 CM Bh 15,400.00 1,078.00 1,540.00 3.00 - - - 1.12 4.00 26.50 - 551.20 18,569.00
Riol Uk. 15 CM Bh 22,220.00 1,555.00 2,222.00 3.00 - - - 1.12 4.00 36.70 - 763.36 26,760.00
Riol Uk. 20 CM Bh 27,500.00 1,925.00 2,750.00 3.00 - - - 1.12 4.00 46.90 - 975.52 33,151.00
Riol Uk. 25 CM Bh 43,450.00 3,042.00 4,345.00 3.00 - - - 1.12 4.00 78.90 - 1,641.12 52,478.00
Riol Uk. 30 CM Bh 49,500.00 3,465.00 4,950.00 3.00 - - - 1.12 4.00 119.10 - 2,477.28 60,392.00
Riol Uk. 40 CM Bh 92,950.00 6,507.00 9,295.00 3.00 - - - 1.12 4.00 187.80 - 3,906.24 112,658.00
Riol Uk. 50 CM Bh 122,100.00 8,547.00 12,210.00 3.00 - - - 1.12 4.00 228.60 - 4,754.88 147,612.00
Riol Uk. 60 CM Bh 144,100.00 10,087.00 14,410.00 3.00 - - - 1.12 4.00 319.10 - 6,637.28 175,234.00
Riol Uk. 70 CM Bh 172,150.00 12,051.00 17,215.00 3.00 - - - 1.12 4.00 424.50 - 8,829.60 210,246.00

2 SEMEN & KAPUR Semen PC. @ 40 Kg Zak 57,200.00 4,004.00 5,720.00 3.00 - - - 1.12 4.00 40.00 - 832.00 67,756.00
Semen PC. @ 50 Kg Zak 71,500.00 5,005.00 7,150.00 3.00 - - - 1.12 4.00 50.00 - 1,040.00 84,695.00
Semen Putih Kg 6,050.00 424.00 605.00 3.00 - - - 1.12 4.00 1.00 - 20.80 7,100.00
Kapur Aduk ( 20 Kg ) Krg 94,622.00 6,624.00 9,462.00 3.00 - - - 1.12 4.00 1.00 - 20.80 110,729.00

3 BESI BETON & PROFIL BESI BETON


Besi Beton Kiloan Kg 11,000.00 770.00 1,100.00 3.00 - - - 1.12 4.00 1.00 - 20.80 12,891.00
Besi Beton Ulir Kg 18,590.00 1,301.00 1,859.00 3.00 - - - 1.12 4.00 1.00 - 20.80 21,771.00

BESI PROFIL
Besi Profil Kiloan Kg 30,492.00 2,134.00 3,049.00 3.00 1.12 4.00 1.00 - 20.80 35,696.00
Besi Siku L 30 x 30 x 3 Btg 82,901.00 5,803.00 8,290.00 3.00 - - - 1.12 4.00 3.75 - 78.00 97,072.00
Besi Siku L 40 x 40 x 4 Btg 130,125.00 9,109.00 13,013.00 3.00 - - - 1.12 4.00 4.25 - 88.40 152,335.00
Besi Siku L 50 x 50 x 5 Btg 239,580.00 16,771.00 23,958.00 3.00 - - - 1.12 4.00 11.70 - 243.36 280,552.00
Besi Siku L 60 x 60 x 6 Btg 369,334.00 25,853.00 36,933.00 3.00 - - - 1.12 4.00 16.50 - 343.20 432,463.00

Besi Plat Strip Kg - - - 3.00 - - - 1.12 4.00 1.00 - 20.80 21.00


Besi Strip 4 x 19 mm P. 3,4 m Btg - - - 3.00 - - - 1.12 4.00 3.20 - 66.56 67.00
Besi Strip 4 x 25 mm P. 3,4 m Btg - - - 3.00 - - - 1.12 4.00 8.00 - 166.40 166.00
Besi Strip 4 x 32 mm P. 3,4 m Btg - - - 3.00 - - - 1.12 4.00 8.40 - 174.72 175.00
1 2 3 4 5 9 10 11 12 13 14 15 16 17 18 19
Besi Strip 4 x 38 mm P. 5,7 m Btg - - - 3.00 - - - 1.12 4.00 15.20 - 316.16 316.00

4 PLAT BESI PLAT


Plat 4' x 8' x t = 1,2 mm Lbr 349,388.00 24,457.00 34,939.00 3.00 - - - 1.12 4.00 23.25 - 483.70 409,268.00
Plat 4' x 8' x t = 1,5 mm Lbr 592,394.00 41,468.00 59,239.00 3.00 - - - 1.12 4.00 38.76 - 806.17 693,907.00
Plat 4' x 8' x t = 4 mm Lbr 1,270,500.00 88,935.00 127,050.00 3.00 - - - 1.12 4.00 77.52 - 1,612.33 1,488,097.00
Plat 4' x 8' x t = 6 mm Lbr 2,512,590.00 175,881.00 251,259.00 3.00 - - - 1.12 4.00 116.27 - 2,418.50 2,942,149.00
Plat 4' x 8' x t = 10 mm Lbr 4,235,000.00 296,450.00 423,500.00 3.00 - - - 1.12 4.00 193.79 - 4,030.83 4,958,981.00
ALUMINIUM PLAT
Plat 4' x 8' x t = 0,3 mm Lbr 101,310.00 7,092.00 10,131.00 3.00 - - - 1.12 4.00 1.65 - 34.32 118,567.00
Plat 4' x 8' x t = 0,4 mm Lbr 151,800.00 10,626.00 15,180.00 3.00 - - - 1.12 4.00 2.20 - 45.76 177,652.00
Plat 4' x 8' x t = 0,5 mm Lbr 202,400.00 14,168.00 20,240.00 3.00 - - - 1.12 4.00 2.80 - 58.24 236,866.00
Plat 4' x 8' x t = 0,6 mm Lbr 253,000.00 17,710.00 25,300.00 3.00 - - - 1.12 4.00 3.30 - 68.64 296,079.00
Plat 4' x 8' x t = 0,7 mm Lbr 278,300.00 19,481.00 27,830.00 3.00 - - - 1.12 4.00 3.80 - 79.04 325,690.00
Plat 4' x 8' x t = 0,8 mm Lbr 328,900.00 23,023.00 32,890.00 3.00 - - - 1.12 4.00 4.40 - 91.52 384,905.00
Plat 4' x 8' x t = 0,9 mm Lbr 379,500.00 26,565.00 37,950.00 3.00 - - - 1.12 4.00 5.00 - 104.00 444,119.00
Plat 4' x 8' x t = 1,0 mm Lbr 695,750.00 48,703.00 69,575.00 3.00 - - - 1.12 4.00 5.60 - 116.48 814,144.00
SENG PLAT
Plat 3' x 6' x t = 0,2 mm Lbr 59,400.00 4,158.00 5,940.00 3.00 - - - 1.12 4.00 2.80 - 58.24 69,556.00
Plat 3' x 6' x t = 0,25 mm Lbr 71,280.00 4,990.00 7,128.00 3.00 - - - 1.12 4.00 3.50 - 72.80 83,471.00
Plat 3' x 6' x t = 0,3 mm Lbr 79,200.00 5,544.00 7,920.00 3.00 - - - 1.12 4.00 5.57 - 115.86 92,780.00
Plat 3' x 6' x t = 0,35 mm Lbr 99,000.00 6,930.00 9,900.00 3.00 - - - 1.12 4.00 6.50 - 135.20 115,965.00
Plat 3' x 6' x t = 0,4 mm Lbr 147,950.00 10,357.00 14,795.00 3.00 - - - 1.12 4.00 7.43 - 154.54 173,257.00

5 PIPA PIPA PVC TYPE AW


Uk. 1/2" Btg 33,000.00 2,310.00 3,300.00 3.00 - - - 1.12 4.00 0.30 - 6.24 38,616.00
Uk. 3/4" Btg 44,000.00 3,080.00 4,400.00 3.00 - - - 1.12 4.00 0.50 - 10.40 51,490.00
Uk. 1" Btg 60,500.00 4,235.00 6,050.00 3.00 - - - 1.12 4.00 0.70 - 14.56 70,800.00
Uk. 1 1/4" Btg 88,000.00 6,160.00 8,800.00 3.00 - - - 1.12 4.00 0.90 - 18.72 102,979.00
Uk. 1 1/2" Btg 104,500.00 7,315.00 10,450.00 3.00 - - - 1.12 4.00 1.10 - 22.88 122,288.00
Uk. 2" Btg 132,000.00 9,240.00 13,200.00 3.00 - - - 1.12 4.00 1.50 - 31.20 154,471.00
Uk. 2 1/2" Btg 192,500.00 13,475.00 19,250.00 3.00 - - - 1.12 4.00 2.10 - 43.68 225,269.00
Uk. 3" Btg 220,000.00 15,400.00 22,000.00 3.00 - - - 1.12 4.00 3.00 - 62.40 257,462.00
Uk. 4" Btg 412,500.00 28,875.00 41,250.00 3.00 - - - 1.12 4.00 5.40 - 112.32 482,737.00

Solvent semen Kg 10,977.00 768.00 1,098.00 3.00 - - - 1.12 4.00 1.00 - 20.80 12,864.00
Amplas Lbr 6,050.00 424.00 605.00 3.00 - - - 1.12 4.00 0.01 - 0.21 7,079.00

PIPA GALVANIS PUTIH


Uk. 3/4" Btg 29,253.00 2,048.00 2,925.00 3.00 - - - 1.12 4.00 7.76 - 161.41 34,387.00
Uk. 1 " Btg 45,020.00 3,151.00 4,502.00 3.00 - - - 1.12 4.00 10.15 - 211.12 52,884.00
Uk. 1 1/4" T. 2.4 Btg 57,261.00 4,008.00 5,726.00 3.00 - - - 1.12 4.00 15.88 - 330.30 67,325.00
Uk. 1 1/2" T. 2.4 Btg 64,937.00 4,546.00 6,494.00 3.00 - - - 1.12 4.00 22.00 - 457.60 76,435.00
Uk. 2" T. 2.4 Btg 91,079.00 6,376.00 9,108.00 3.00 - - - 1.12 4.00 27.78 - 577.82 107,141.00
Uk. 2 1/2" T. 2.4 Btg 116,804.00 8,176.00 11,680.00 3.00 - - - 1.12 4.00 32.78 - 681.82 137,342.00
Uk. 3" T. 2.4 Btg 152,696.00 10,689.00 15,270.00 3.00 - - - 1.12 4.00 42.13 - 876.30 179,531.00
Uk. 4" T. 2.4 Btg 219,916.00 15,394.00 21,992.00 3.00 - - - 1.12 4.00 54.71 - 1,137.97 258,440.00
PIPA BESI HITAM
Uk. 1/2" T. 2 MM Btg 112,310.00 7,862.00 11,231.00 3.00 - - - 1.12 4.00 5.33 - 110.86 131,514.00
Uk. 3/4" T. 2 MM Btg 132,110.00 9,248.00 13,211.00 3.00 - - - 1.12 4.00 7.07 - 147.06 154,716.00
Uk. 1" T. 2 MM Btg 178,200.00 12,474.00 17,820.00 3.00 - - - 1.12 4.00 11.54 - 240.03 208,734.00
Uk. 1 1/4" T. 2 MM Btg 198,000.00 13,860.00 19,800.00 3.00 - - - 1.12 4.00 13.32 - 277.06 231,937.00
Uk. 1 1/2" T. 2 MM Btg 211,200.00 14,784.00 21,120.00 3.00 - - - 1.12 4.00 14.13 - 293.90 247,398.00
Uk. 2" T. 2 MM Btg 237,600.00 16,632.00 23,760.00 3.00 - - - 1.12 4.00 16.72 - 347.78 278,340.00
Uk. 2 1/2" T. 2 MM Btg 316,800.00 22,176.00 31,680.00 3.00 - - - 1.12 4.00 21.42 - 445.54 371,102.00
Uk. 3" T. 2 MM Btg 396,000.00 27,720.00 39,600.00 3.00 - - - 1.12 4.00 28.58 - 594.46 463,914.00
Uk. 4" T. 2 MM Btg 528,000.00 36,960.00 52,800.00 3.00 - - - 1.12 4.00 35.74 - 743.39 618,503.00

PIPA HOLLOW
Uk. 25 x 25 mm x 5,7 m Btg - - - 3.00 - - - 1.12 4.00 5.33 - 110.86 111.00
Uk. 30 x 30 mm x 5,7 m Btg - - - 3.00 - - - 1.12 4.00 7.07 - 147.06 147.00
Uk. 40 x 40 mm x 5,7 m Btg - - - 3.00 - - - 1.12 4.00 11.54 - 240.03 240.00
Uk. 50 x 50 mm x 5,7 m Btg - - - 3.00 - - - 1.12 4.00 13.32 - 277.06 277.00
Uk. 60 x 60 mm x 5,7 m Btg - - - 3.00 - - - 1.12 4.00 14.13 - 293.90 294.00
Uk. 30 x 60 mm x 5,7 m Btg - - - 3.00 - - - 1.12 4.00 16.72 - 347.78 348.00

BESI PAGAR KW. 2


Besi Pagar T.90 CM , L. 2,4 M Set - - - 3.00 - - - 1.12 4.00 12.00 - 249.60 250.00
Besi Pagar T.120 CM , L. 2,4 M Set - - - 3.00 - - - 1.12 4.00 15.00 - 312.00 312.00
Tiang Pagar T. 175 Bh - - - 3.00 - - - 1.12 4.00 1.00 - 20.80 21.00
Penutup Tiang Bh - - - 3.00 - - - 1.12 4.00 0.02 - 0.42 -
Baut + Mor pengunci Set - - - 3.00 - - - 1.12 4.00 0.01 - 0.21 -

6 PAKU & PISHER Paku Biasa Kg 19,800.00 1,386.00 1,980.00 3.00 - - - 1.12 4.00 1.00 - 20.80 23,187.00
1 2 3 4 5 9 10 11 12 13 14 15 16 17 18 19
Paku Seng (100 Bh/Ktk) Ktk 33,000.00 2,310.00 3,300.00 3.00 - - - 1.12 4.00 1.50 - 31.20 38,641.00
Paku Asbes Gelombang (Paku Ulir) Kg 42,000.00 2,940.00 4,200.00 3.00 - - - 1.12 4.00 0.02 - 0.31 49,140.00
Paku Beton Ktk 22,000.00 1,540.00 2,200.00 3.00 - - - 1.12 4.00 0.50 - 10.40 25,750.00
Paku Lintah Ktk 27,940.00 1,956.00 2,794.00 3.00 - - - 1.12 4.00 0.02 - 0.31 32,690.00
Pisher (S 8) Bh 1,903.00 133.00 190.00 3.00 - - - 1.12 4.00 0.02 - 0.31 2,226.00
Pisher (S 10) Bh 2,217.00 155.00 222.00 3.00 - - - 1.12 4.00 0.02 - 0.31 2,594.00
Pisher (S 12) Bh 2,530.00 177.00 253.00 3.00 - - - 1.12 4.00 0.02 - 0.31 2,960.00

7 ANGKER & BAUT Anker Baut Ø 20 MM Bh 3,960.00 277.00 396.00 3.00 - - - 1.12 4.00 0.03 - 0.62 4,634.00
Baut Ø 0,5" - 0,5" Bh 1,210.00 85.00 121.00 3.00 - - - 1.12 4.00 0.03 - 0.62 1,417.00
Baut Ø 0,5" - 1" Bh 1,573.00 110.00 157.00 3.00 - - - 1.12 4.00 0.03 - 0.62 1,841.00
Baut Ø 0,5" - 1,5" Bh 2,035.00 142.00 204.00 3.00 - - - 1.12 4.00 0.04 - 0.83 2,382.00
Baut Ø 0,5" - 2" Bh 2,178.00 152.00 218.00 3.00 - - - 1.12 4.00 0.05 - 1.04 2,549.00
Baut Ø 0,5" - 2,5" Bh 2,453.00 172.00 245.00 3.00 - - - 1.12 4.00 0.07 - 1.46 2,871.00
Baut Ø 0,5" - 3" Bh 2,783.00 195.00 278.00 3.00 - - - 1.12 4.00 0.08 - 1.66 3,258.00
Baut Ø 0,5" - 3,5" Bh 2,915.00 204.00 292.00 3.00 - - - 1.12 4.00 0.09 - 1.87 3,413.00
Baut Ø 0,5" - 4" Bh 3,146.00 220.00 315.00 3.00 - - - 1.12 4.00 0.10 - 2.08 3,683.00
Baut Ø 0,5" - 4,5" Bh 3,388.00 237.00 339.00 3.00 - - - 1.12 4.00 0.11 - 2.29 3,966.00
Baut Ø 0,5" - 5" Bh 3,630.00 254.00 363.00 3.00 - - - 1.12 4.00 0.12 - 2.50 4,250.00
Baut Ø 0,5" - 5,5" Bh 4,015.00 281.00 402.00 3.00 - - - 1.12 4.00 0.13 - 2.70 4,701.00
Baut Ø 0,5" - 6" Bh 4,114.00 288.00 411.00 3.00 - - - 1.12 4.00 0.15 - 3.12 4,816.00
Baut Ø 0,5" - 7" Bh 4,840.00 339.00 484.00 3.00 - - - 1.12 4.00 0.17 - 3.54 5,667.00
Baut Ø 0,5" - 8" Bh 5,445.00 381.00 545.00 3.00 - - - 1.12 4.00 0.19 - 3.95 6,375.00
Baut Ø 0,5" - 9" Bh 5,808.00 407.00 581.00 3.00 - - - 1.12 4.00 0.21 - 4.37 6,800.00
Baut Ø 0,5" - 10" Bh 7,018.00 491.00 702.00 3.00 - - - 1.12 4.00 0.23 - 4.78 8,216.00
Baut Ø 0,5" - 11" Bh 7,260.00 508.00 726.00 3.00 - - - 1.12 4.00 0.25 - 5.20 8,499.00

8 KAWAT Beton Kg 24,200.00 1,694.00 2,420.00 3.00 - - - 1.12 4.00 1.00 - 20.80 28,335.00
Bronjong Roll 707,850.00 49,550.00 70,785.00 3.00 - - - 1.12 4.00 1.00 - 20.80 828,206.00
Duri Lokal (70 M) Glg 114,950.00 8,047.00 11,495.00 3.00 - - - 1.12 4.00 9.00 - 187.20 134,679.00
Nyamuk Lokal M2 24,200.00 1,694.00 2,420.00 3.00 - - - 1.12 4.00 0.50 - 10.40 28,324.00
Harmonika M2 30,250.00 2,118.00 3,025.00 3.00 - - - 1.12 4.00 0.50 - 10.40 35,403.00

15 CAT Kilat Kg 49,500.00 3,465.00 4,950.00 3.00 - - - 1.12 4.00 1.00 - 20.80 57,936.00
Perak Kg 55,000.00 3,850.00 5,500.00 3.00 - - - 1.12 4.00 1.00 - 20.80 64,371.00
Tembok Kg 22,000.00 1,540.00 2,200.00 3.00 - - - 1.12 4.00 1.00 - 20.80 25,761.00
Pernis Klng 38,500.00 2,695.00 3,850.00 3.00 - - - 1.12 4.00 1.00 - 20.80 45,066.00
Serlak Btl 27,500.00 1,925.00 2,750.00 3.00 - - - 1.12 4.00 0.80 - 16.64 32,192.00
Anti Rembes Kg 50,600.00 3,542.00 5,060.00 3.00 - - - 1.12 4.00 1.00 - 20.80 59,223.00
Menie Kg 22,000.00 1,540.00 2,200.00 3.00 - - - 1.12 4.00 1.00 - 20.80 25,761.00
Thinner Ltr 17,500.00 1,225.00 1,750.00 3.00 - - - 1.12 4.00 1.00 - 20.80 20,496.00

16 KACA & FRAME NAKO Polos Tebal = 5 mm Kaki 10,560.00 739.00 1,056.00 3.00 - - - 1.12 4.00 0.50 - 10.40 12,365.00
Rayben Tebal = 5 mm Kaki 11,880.00 832.00 1,188.00 3.00 - - - 1.12 4.00 0.50 - 10.40 13,910.00
Glass Block Uk. 20 x 20 CM Bh 24,420.00 1,709.00 2,442.00 3.00 - - - 1.12 4.00 1.00 - 20.80 28,592.00
Frame Jendela Nako Daun 9,900.00 693.00 990.00 3.00 - - - 1.12 4.00 0.20 - 4.16 11,587.00

17 BAHAN ELEKTRIKAL LAMPU


Lampu Pijar 25 Watt Set 5,000.00 350.00 500.00 3.00 - - - 1.12 4.00 0.20 - 4.16 5,854.00
Lampu Pijar 40 Watt Set 6,000.00 420.00 600.00 3.00 - - - 1.12 4.00 0.80 - 16.64 7,037.00
TL IB2 x 20 cm Set 154,000.00 10,780.00 15,400.00 3.00 - - - 1.12 4.00 2.00 - 41.60 180,222.00
TL IB 2 x 40 cm Set 192,500.00 13,475.00 19,250.00 3.00 - - - 1.12 4.00 2.30 - 47.84 225,273.00
TL 20 Watt Set 26,750.00 1,873.00 2,675.00 3.00 - - - 1.12 4.00 0.80 - 16.64 31,315.00
TL 40 Watt Set 66,000.00 4,620.00 6,600.00 3.00 - - - 1.12 4.00 0.90 - 18.72 77,239.00
TL Bambu 20 Watt Set 104,500.00 7,315.00 10,450.00 3.00 - - - 1.12 4.00 0.50 - 10.40 122,275.00
TL Bambu 40 Watt Set 115,500.00 8,085.00 11,550.00 3.00 - - - 1.12 4.00 0.80 - 16.64 135,152.00
PLC 18 Watt Set 30,800.00 2,156.00 3,080.00 3.00 - - - 1.12 4.00 0.20 - 4.16 36,040.00
PLC 24 Watt Set 37,664.00 2,636.00 3,766.00 3.00 - - - 1.12 4.00 0.20 - 4.16 44,070.00
PLC 32 Watt Set 44,726.00 3,131.00 4,473.00 3.00 - - - 1.12 4.00 0.20 - 4.16 52,334.00
PLC 60 Watt Set 82,390.00 5,767.00 8,239.00 3.00 - - - 1.12 4.00 0.20 - 4.16 96,400.00
DL PLC 18 Watt Set 85,800.00 6,006.00 8,580.00 3.00 - - - 1.12 4.00 0.50 - 10.40 100,396.00
PANEL & POMPA AIR
Panel Kontrol (40x50x20) + Acc Set 1,980,000.00 138,600.00 198,000.00 3.00 - - - 1.12 4.00 5.00 - 104.00 2,316,704.00
Pompa Air Bh 385,000.00 26,950.00 38,500.00 3.00 - - - 1.12 4.00 5.00 - 104.00 450,554.00
Exosphan 14" Set 385,000.00 26,950.00 38,500.00 3.00 - - - 1.12 4.00 3.00 - 62.40 450,512.00
Kipas Angin Type 56 CM Set 192,500.00 13,475.00 19,250.00 3.00 - - - 1.12 4.00 3.50 - 72.80 225,298.00
(Panasonic)
Bak Air Fiber 1000 ltr Set 3,932,500.00 275,275.00 393,250.00 3.00 - - - 1.12 4.00 20.00 - 416.00 4,601,441.00
Bak Air Fiber 2000 ltr Set 2,162,875.00 151,401.00 216,288.00 3.00 - - - 1.12 4.00 10.00 - 208.00 2,530,772.00

KETERANGAN Panyabungan, Maret 2012

AB = Aspal Beton Diperiksa Oleh : Dibuat Oleh :


1 2 3 4 5 9 10 11 12 13 14 15 16 17 18 19
AP = Aspal Penetrasi
T/S = Telford/Sirtu CV. TUREDO SOLUSI KONSULTAN CV. TUREDO SOLUSI KONSULTAN
TH = Tanah

KOLOM

14 = Wktu Trip = (2xAB)/50 + (2xAP)/40 + (2xT/S)/40 + (2xTH)/15 + 1


15 = Jumlah Trip = 5/waktu/trip (Pembulatan Kebawah) Ir. M. TURE SIBURIAN Ir. JAMILAM SARAGIH
17 = Biaya Angkut Rp 0 / (Jumlah Trip x 4) Team Leader Cost Estimator
18 = Biaya Bongkar Muat = Rp 0,64 x Upah Pekerja Tidak Terampil ( Rp. 58.500 )
19 = (5 + 6 + 7 + 8 + 9 + 17 + 18 )
PERHITUNGAN PEMBESIAN

Kolom 10 x 10 x 400

Diameter
No Jenis Panjang (cm) Jumlah Total Panjang (cm) 0.4 0.8 1 1.2 1.4 1.6 1.9 2.2 2.5 Total Berat (kg)

1 Kolom 10 x 10 x 400
a= 7.00
b= 7.00
c= 5.00
d= 5.00
24.00 21 504.00 504.00

a= 408.00
408.00 4 1,632.00 1,632.00

TOTAL PANJANG (CM) 504.00 1,632.00 - - - - - - -


BERAT BAJA TULANGAN (KG/CM) 0.000986 0.003946 0.006170 0.008880 0.012100 0.015780 0.022260 0.029840 0.038530
BERAT TOTAL (KG) 0.50 6.44 - - - - - - - 6.94
VOLUME BETON 1 M' 0.040
BERAT BESI 1 M3 BETON (KG) PANJANG (M') 25.00 173.41
BEKISTING (M2) 40.00 20.00

Sloof 10 x 10 x 400

Diameter
No Jenis Panjang (cm) Jumlah Total Panjang (cm) 0.4 0.8 1 1.2 1.4 1.6 1.9 2.2 2.5 Total Berat (kg)

1 Sloof 10 x 10 x 400
a= 7.00
b= 7.00
c= 5.00
d= 5.00
24.00 24 576.00 576.00

a= 408.00
408.00 4 1,632.00 1,632.00

TOTAL PANJANG (CM) 576.00 1,632.00 - - - - - - -


BERAT BAJA TULANGAN (KG/CM) 0.000986 0.003946 0.006170 0.008880 0.012100 0.015780 0.022260 0.029840 0.038530
BERAT TOTAL (KG) 0.57 6.44 - - - - - - - 7.01
VOLUME BETON 1 M' 0.040
BERAT BESI 1 M3 BETON (KG) PANJANG (M') 25.00 175.18
BEKISTING (M2) 20.00 10.00

Ring Balok 10 x 15 x 400

Diameter
No Jenis Panjang (cm) Jumlah Total Panjang (cm) 0.6 0.8 1 1.2 1.4 1.6 1.9 2.2 2.5 Total Berat (kg)

1 Ring Balok 10 x 15 x 400


a= 8.00
b= 13.00
c= 5.00
d= 10.00
36.00 24 864.00 864.00

a= 410.00
410.00 4 1,640.00 1,640.00

TOTAL PANJANG (CM) 864.00 - 1,640.00 - - - - - -


BERAT BAJA TULANGAN (KG/CM) 0.002219 0.003946 0.006170 0.008880 0.012100 0.015780 0.022260 0.029840 0.038530
BERAT TOTAL (KG) 1.92 - 10.12 - - - - - - 12.04
VOLUME BETON 1 M' 0.060
BERAT BESI 1 M3 BETON (KG) PANJANG (M') 16.67 200.61
BEKISTING (M2) 20.00 10.00

Ring Balok 10 x 10 x 400

Diameter
No Jenis Panjang (cm) Jumlah Total Panjang (cm) 0.6 0.8 1 1.2 1.4 1.6 1.9 2.2 2.5 Total Berat (kg)

1 Ring Balok 10 x 10 x 400


a= 8.00
b= 8.00
c= 5.00
d= 5.00
26.00 24 624.00 624.00

a= 410.00
410.00 4 1,640.00 1,640.00
TOTAL PANJANG (CM) 624.00 - 1,640.00 - - - - - -
BERAT BAJA TULANGAN (KG/CM) 0.002219 0.003946 0.006170 0.008880 0.012100 0.015780 0.022260 0.029840 0.038530
BERAT TOTAL (KG) 1.38 - 10.12 - - - - - - 11.50
VOLUME BETON 1 M' 0.040
BERAT BESI 1 M3 BETON (KG) PANJANG (M') 25.00 287.59
BEKISTING (M2) 20.00 10.00

Plat 100 x 100 x 10

Diameter
No Jenis Panjang (cm) Jumlah Total Panjang (cm) 0.6 0.8 1 1.2 1.4 1.6 1.9 2.2 2.5 Total Berat (kg)

1 Plat 100 x 100 x 10

a= 108.00 10 1,080.00 1,080.00


b= 108.00 10 1,080.00 1,080.00

TOTAL PANJANG (CM) - 2,160.00 - - - - - - -


BERAT BAJA TULANGAN (KG/CM) 0.002219 0.003946 0.006170 0.008880 0.012100 0.015780 0.022260 0.029840 0.038530
BERAT TOTAL (KG) - 8.52 - - - - - - - 8.52
VOLUME BETON 1 M' 0.100
BERAT BESI 1 M3 BETON (KG) PANJANG (M') 10.00 85.23
BEKISTING (M2) 18.00 - 18.00
TIME SCHEDULE

PROGRAM : PENINGKATAN SARANA DAN PRASARANA APARATUR

PEKERJAAN : #REF!

LOKASI : PANYABUNGAN

BULAN I BULAN II BULAN III BULAN IV BULAN V BULAN VI BULAN VII BULAN VIII BULAN IX
NO. URAIAN BOBOT MINGGU KE MINGGU KE MINGGU KE MINGGU KE MINGGU KE MINGGU KE MINGGU KE MINGGU KE MINGGU KE KET
1 2 3 4 5 6 7 8 9 10 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
A. PEKERJAAN PENDAHULUAN
1 Biaya Papan Merek Proyek 1.283 0.642 0.642 100 %
2 Biaya Photo Dokumentasi 0.733 0.733
### #REF! #REF! #REF!
3 Pembersihan Lokasi 0.915 0.305 0.305 0.305

I. PEKERJAAN TANAH
1 Galian Tanah Tapak 0.190 0.190
### #REF! #REF! #REF!
### #REF! #REF! #REF!

III. PEKERJAAN BESI


1 Besi Siku 40 x 40 15.945 15.945
### #REF! #REF! #REF! #REF!

IV. PEKERJAAN CAT


1 Cat kilat 16.403 8.202 8.202
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF!

### #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF!

### #REF!
### #REF! #REF! #REF!
### #REF! #REF! #REF! 50%
### #REF!
### #REF! #REF! #REF!
### #REF! #REF! #REF!
### #REF! #REF! #REF!
### #REF! #REF! #REF!
### #REF! #REF! #REF!
### #REF! #REF! #REF!
### #REF! #REF! #REF!
### #REF! #REF! #REF!
### #REF! #REF! #REF!

### #REF!
### #REF! #REF! #REF!
### #REF! #REF! #REF!
### #REF! #REF! #REF!
### #REF! #REF! #REF!
### #REF! #REF! #REF!
### #REF! #REF! #REF!
### #REF! #REF! #REF!

### #REF!
### #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!

X. PEKERJAAN PEMELIHARAAN 0%

JUMLAH TOTAL #REF!

TARGET RENCANA

RENCANA #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0.95
RENCANA KOMULATIF #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
REALISASI MINGGU INI
REALISASI S/D MINGGU INI
DEVIASI

0 0

0 0
0 0
0 0
0 0