1 2 3
Mengetahui/Menyetujui :
KEPALA DINAS PEKERJAAN UMUM, PERUMAHAN
DAN KAWASAN PERMUKIMAN
KABUPATEN TEMANGGUNG
HENDRA SUMARYANA, MT
Pembina Tingkat I
NIP. 19720224 199203 1 003
RENCANA ANGGARAN BIAYA
PEKERJAAN : SUMUR DALAM MENTO
LOKASI : DESA MENTO, KEC. CANDIROTO
TAHUN ANGGARAN : 2023
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SATUAN SATUAN HARGA
(Rp.) (Rp.)
1 2 3 4 6 7
I Pekerjaan Persiapan
1 Uji Geolistrik 1.00 ls 3,500,000.00 3,500,000.00
JUMLAH I 3,500,000.00
II Pekerjaan Sumber Air
1 Pengeboran Sumur Dalam Ø 6" 70.00 m' 600,000.00 42,000,000.00
2 Pemasangan Pipa PVC Ø 6" type AW (Include Material) 70.00 m' 260,000.00 18,200,000.00
3 Pembuatan Bibir Sumur Beton K-175 1.00 bh 500,000.00 500,000.00
JUMLAH II 60,700,000.00
III Pekerjaan Sumber Air
1 Panel Surya dan Pompa (Terpasang dan Beroperasi) 1.00 ls 45,000,000.00 45,000,000.00
Modul Surya 100 WP + Kabel 21.00 bh 1,300,000.00
Pompa Submersibel Tenaga Surya, EC DRIVE 1800 C. Max RPM 3300 1.00 bh
Efisiensi 92%, Insulation Class F, Stainless Steel A131 304, Standard CE, TUV, IP 68
Aksesories = Lem, Sensor Sumur Sensor Tandon
- Kabel pompa 4 = 2,5 mm = 50 mtr 1.00 lot
- Box Outdoor Controlier (Setting by Android Handphone) 1.00 bh
Integrated MPPT (Max Power Point Tracking),
Power 1,8 KW, Input Voltage Max. 200 Vdc
Motor Current 14 A Standard CE, TUV, IP 65
Akesories = PV disconected, Surge Protector
- Penangkal Petir 1.00 set
- Rak Module Surya 1.00 set
- Selling 50 meter 1.00 set
- Pagar BRC 1 set 1.00 set
- Pipa HDPE 2" 100 meter 1.00 set
JUMLAH IV 43,731,820.70
V Peralatan
1 Angkong 2.00 bh 750,000.00 1,500,000.00
JUMLAH V 1,500,000.00
VI Lain-lain
1 BOP termasuk Prasasti 1.00 ls 1,500,000.00 1,500,000.00
JUMLAH VI 1,500,000.00
TOTAL 155,931,820.70
DIBULATKAN 155,930,000.00
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SATUAN SATUAN HARGA
(Rp.) (Rp.)
a b c d e f = (c x e)
A Pekerjaan Persiapan
1 Uji Geolistrik 1.00 ls 4,500,000.00 4,500,000.00
JUMLAH A 4,500,000.00
B Pekerjaan Sumber Air
1 Pengeboran Sumur Dalam Ø 6" - 8" 84.00 m 660,500.00 55,482,000.00
2 Pemasangan Pipa PVC Ø 6" type AW 84.00 m 225,143.73 18,912,073.32
3 Pipa hisap HDPE Ø 1.5" 100.00 m 41,000.00 4,100,000.00
Logging Test 1.00 Ls 1,700,000.00 1,700,000.00
Gravel Pack 0.76 m3 900,000.00 684,000.00
Well Development 1.00 Ls 631,000.00 631,000.00
Pumping Test 12.00 jam 180,000.00 2,160,000.00
Pembuatan Bibir Sumur Beton K-175 1.00 Ls 450,000.00 450,000.00
JUMLAH B 84,119,073.32
TOTAL PEKERJAAN A & B 88,619,073.32
PPn 11% 9,748,098.07
SUB TOTAL PEKERJAAN A & B 98,367,171.39
JUMLAH C 91,891,891.89
PPn 11% 10,108,108.11
SUB TOTAL PEKERJAAN C 102,000,000.00
SUB TOTAL PEKERJAAN A + B + C (TERMASUK PPn 11%) 200,367,171.39
JUMLAH D 60,760,669.95
V Peralatan
1 Angkong 3.00 bh 750,000.00 2,250,000.00
JUMLAH E 2,250,000.00
VI Lain-lain
1 Biaya Rapat 3x 2.00 ls 750,000.00 1,500,000.00
2 ATK 2.00 ls 200,000.00 400,000.00
3 Fotocopy + Jilid 2.00 ls 300,000.00 600,000.00
4 Prasasti 1.00 ls 250,000.00 250,000.00
JUMLAH F 2,750,000.00
SUB TOTAL PEKERJAAN D + E + F (TERMASUK PPn 11%) 65,760,669.95
SUB TOTAL PEKERJAAN A + B + C + D + E + F (TERMASUK PPn 11%) 266,127,841.33
TOTAL 266,120,000.00
SLAMET Purwaji
Kelompok : KT. Tani Makmur
Desa/Kelurahan : Mento
Kecamatan : Candiroto
Kab./Kota : Temanggung
Provinsi : Jawa Tengah
Biaya (Rupiah)
Uraian
Volume Harga Satuan Jumlah
a b c d = (b x c)
A. Bahan/Material
1. Batu Belah 7.00 m3 290,000 2,030,000
2. Pasir Cor/Beton (Muntilan) 8.00 m3 319,000 2,552,000
3. Pasir Urug 1.00 m3 254,000 254,000
4. Portland cement (PC) 77.00 zak 71,000 5,467,000
5. Batu Pecah 2/3 7.00 m3 337,500 2,362,500
6. Multiplek 9mm 12.00 Lbr 96,000 1,152,000
7. Kayu Kaso 2m 79.00 Btg 22,500 1,777,500
8. Papan 24.00 Lbr 22,500 540,000
9. Paku 5.00 kg 22,500 112,500
10. Cat Mowilex Eksterior 5.00 kg 51,000 255,000
11. Besi dia. 13 34.00 lonjor 169,000 5,746,000
12. Besi dia. 10 71.00 lonjor 90,000 6,390,000
13. Besi dia. 8 22.00 lonjor 60,000 1,320,000
14. Bendrat 9.00 kg 22,500 202,500
15. Minyak bekisting 5.00 ltr 27,000 135,000
16. 1 Paket Panel Surya dan Pompa 1.00 ls 200,367,171 200,367,171
(Terpasang dan Beroperasi)
17. Manhole Bak Kontrol Reservoir 1.00 ls 700,000 700,000
18. Pipa inlet PVC 2" 20.00 btg 160,000 3,200,000
19. L GIP o 2" 4.00 bh 70,000 280,000
20. T GIP o 2" 2.00 bh 87,829 175,657
21. Pipa GIP o 2" P.50cm 2.00 bh 40,000 80,000
22. Stop Kran 2" 2.00 bh 540,500 1,081,000
23. Pelapis Bocor (Damdex) 5.00 liter 73,500 367,500
24. Benang 2.00 roll 3,000 6,000
25. Pagar BRC 120 9.00 lbr 390,000 3,510,000
26. Pipa Besi 2" 20.00 btg 375,000 7,500,000
C. Lainnya
1. Biaya Rapat 3x 1.00 ls 750,000 750,000
2. ATK 2.00 ls 200,000 400,000
3. Fotocopy + Jilid 2.00 ls 300,000 600,000
4. Prasasti 1.00 bh 250,000 250,000
Jumlah 262,863,329
SLAMET Supriyanto
0
0
0
Kelompok : KT. Tani Makmur
Desa/Kelurahan : Mento
Kecamatan : Candiroto
Kab./Kota : Temanggung
Provinsi : Jawa Tengah
Biaya (Rupiah)
Uraian
Volume Harga Satuan Jumlah
a b c d = (b x c)
A. Bahan/Material
1. Batu Belah 0.00 m3 290,000 0
2. Pasir Cor/Beton (Muntilan) 0.00 m3 319,000 0
3. Pasir Urug 0.00 m3 254,000 0
4. Portland cement (PC) 0.00 zak 71,000 0
5. Batu Pecah 2/3 0.00 m3 337,500 0
6. Multiplek 9mm 0.00 Lbr 96,000 0
7. Kayu Kaso 2m 0.00 Btg 22,500 0
8. Papan 0.00 Lbr 22,500 0
9. Paku 0.00 kg 22,500 0
10. Cat Mowilex Eksterior 0.00 kg 51,000 0
11. Besi dia. 13 0.00 lonjor 169,000 0
12. Besi dia. 10 0.00 lonjor 90,000 0
13. Besi dia. 8 0.00 lonjor 60,000 0
14. Bendrat 0.00 kg 22,500 0
15. Minyak bekisting 0.00 ltr 27,000 0
16. 1 Paket Panel Surya dan Pompa 1.00 ls 149,300,000 149,300,000
(Terpasang 60%)
17. Manhole Bak Kontrol Reservoir 0.00 ls 700,000 0
18. Pipa inlet PVC 2" 0.00 btg 160,000 0
19. L GIP o 2" 0.00 bh 70,000 0
20. T GIP o 2" 0.00 bh 87,829 0
21. Pipa GIP o 2" P.50cm 0.00 bh 40,000 0
22. Stop Kran 2" 0.00 bh 540,500 0
23. Pelapis Bocor (Damdex) 0.00 liter 73,500 0
24. Benang 0.00 roll 3,000 0
25. Pagar BRC 120 0.00 lbr 390,000 0
26. Pipa Besi 2" 0.00 btg 375,000 0
C. Lainnya
1. Biaya Rapat 2x 1.00 ls #NAME? #NAME?
2. ATK 2.00 ls #NAME? #NAME?
3. Fotocopy + Jilid 2.00 ls #NAME? #NAME?
4. Prasasti 0.00 bh #NAME? #NAME?
Jumlah #NAME?
Dibuat Oleh :
Ketua
Kelompok Tani Makmur
Supriyanto
Kelompok : KT. Tani Makmur
Desa/Kelurahan : Mento
Kecamatan : Candiroto
Kab./Kota : Temanggung
Provinsi : Jawa Tengah
Biaya (Rupiah)
Uraian
Volume Harga Satuan Jumlah
a b c d = (b x c)
A. Bahan/Material
1. Batu Belah 7.00 m3 290,000 2,030,000
2. Pasir Cor/Beton (Muntilan) 8.00 m3 319,000 2,552,000
3. Pasir Urug 1.00 m3 254,000 254,000
4. Portland cement (PC) 77.00 zak 71,000 5,467,000
5. Batu Pecah 2/3 7.00 m3 337,500 2,362,500
6. Multiplek 9mm 12.00 Lbr 96,000 1,152,000
7. Kayu Kaso 2m 79.00 Btg 22,500 1,777,500
8. Papan 24.00 Lbr 22,500 540,000
9. Paku 5.00 kg 22,500 112,500
10. Cat Mowilex Eksterior 5.00 kg 51,000 255,000
11. Besi dia. 13 34.00 lonjor 169,000 5,746,000
12. Besi dia. 10 71.00 lonjor 90,000 6,390,000
13. Besi dia. 8 22.00 lonjor 60,000 1,320,000
14. Bendrat 9.00 kg 22,500 202,500
15. Minyak bekisting 5.00 ltr 27,000 135,000
16. 1 Paket Panel Surya dan Pompa 1.00 ls 51,067,171 51,067,171
(Terpasang dan Beroperasi)
17. Manhole Bak Kontrol Reservoir 1.00 ls 700,000 700,000
18. Pipa inlet PVC 2" 20.00 btg 160,000 3,200,000
19. L GIP o 2" 4.00 bh 70,000 280,000
20. T GIP o 2" 2.00 bh 87,829 175,657
21. Pipa GIP o 2" P.50cm 2.00 bh 40,000 80,000
22. Stop Kran 2" 2.00 bh 540,500 1,081,000
23. Pelapis Bocor (Damdex) 5.00 liter 73,500 367,500
24. Benang 2.00 roll 3,000 6,000
25. Pagar BRC 120 9.00 lbr 390,000 3,510,000
26. Pipa Besi 2" 20.00 btg 375,000 7,500,000
C. Lainnya
1. Biaya Rapat 1x 1.00 ls #NAME? #NAME?
2. ATK 1.00 ls #NAME? #NAME?
3. Fotocopy + Jilid 1.00 ls #NAME? #NAME?
4. Prasasti 1.00 bh #NAME? #NAME?
Jumlah #NAME?
Dibuat Oleh :
Ketua
Kelompok Tani Makmur
Supriyanto
BACK UP VOLUME
VOLUME PEKERJAAN
PONDASI
GALIAN TANAH P x L x T x J
Footplat 1.00 x 1.00 x 1.45 x 4.00 = 5.80
Pondasi 10.00 x 1.00 x 1.00 = 10.00
15.80 m3
PAS. BATU P x L x T
Aanstamping 10.00 x 0.80 x 0.20 = 1.60 m3
Pondasi 10.00 x 0.55 x 0.75 = 4.13 m3
BETON P x L x T x J
Footplat 1.00 x 1.00 x 0.20 x 4.00 = 0.80 m3
Pedestal 0.30 x 0.30 x 1.25 x 4.00 = 0.45 m3
Sloof Pagar 14.00 x 0.15 x 0.20 x 1.00 = 0.42 m3
Kolom Pagar 0.15 x 0.15 x 0.50 x 8.00 = 0.09 m3
BEGISTING P x T x JML
Footplat 4.00 x 0.20 x 4.00 = 3.20 m2
Pedestal 1.20 x 1.25 x 4.00 = 6.00 m2
Sloof 10.00 x 0.60 x 4.00 = 24.00 m2
RESERVOIR
BETON P x L x T x JML
Lantai 2.50 x 2.50 x 0.15 x 1.00 = 0.94
Sloof 2.50 x 0.20 x 0.30 x 4.00 = 0.60
Kolom 0.30 x 0.30 x 1.50 x 4.00 = 0.54
Dinding 2.50 x 1.50 x 0.15 x 4.00 = 2.25
Ring Balok 2.50 x 0.20 x 0.30 x 4.00 = 0.60
Tutup Plat 2.60 x 2.60 x 0.15 x 1.00 = 1.01
0.60 x 0.60 x 0.15 x -1.00 = -0.05
5.89 m3
PEMBESIAN D Tul P. Besi J.besi t.panjang J.Titik bj b. besi (Kg)
Lantai ø 10 2.80 16.67 46.67 4.00 0.617 115.08
Dinding ø 10 2.80 10.00 28.00 8.00 0.617 138.10
ø 10 1.80 16.67 30.00 8.00 0.617 147.96
Kolom ø 13 1.70 8.00 13.60 4.00 1.042 56.68
ø8 1.30 11.33 14.73 4.00 0.395 23.25
Ring Balok ø 13 10.30 8.00 82.40 1.00 1.042 85.85
ø8 1.10 68.67 75.53 1.00 0.395 29.80
Tutup ø 10 2.80 17.33 48.53 4.00 0.617 119.68
Total (Kg) 716.40
ACIAN P x T x JML
Lantai dan Tutup 2.50 x 2.50 x 3.00 = 18.75
Dinding 2.50 x 1.50 x 8.00 = 30.00
Kolom 1.20 x 1.50 x 4.00 = 7.20
Ring Balok 1.00 x 2.50 x 4.00 = 10.00
65.95 m2
HARGA
NO. URAIAN SATUAN ANALISA SATUAN
(Rp)
1 2 3 4 5
IV Pekerjaan Pemipaan
1 Pemasangan Pipa Galvanis diameter 1/2" m' A.5.1.1.18 66,500.00
2 Pemasangan Pipa Galvanis diameter 3/4" m' A.5.1.1.20 80,200.00
3 Pemasangan Pipa Galvanis diameter 1" m' A.5.1.1.21 108,741.67
4 Pemasangan Pipa Galvanis diameter 1 1/2" m' A.5.1.1.22 129,632.08
5 Pemasangan Pipa Galvanis diameter 2" m' A.5.1.1.23.a 242,600.00
6 Pemasangan Pipa Galvanis diameter 2 1/2" m' A.5.1.1.23.b 256,300.00
7 Pemasangan Pipa Galvanis diameter 3" m' A.5.1.1.23. 355,310.00
8 Pemasangan Pipa Galvanis diameter 4" m' A.5.1.1.24, 363,815.42
9 Pemasangan Pipa PVC AW diameter 1/2" m' A.5.1.1.25. 14,520.00
10 Pemasangan Pipa PVC AW diameter 3/4" m' A.5.1.1.26. 16,200.00
11 Pemasangan Pipa PVC AW diameter 1" m' A.5.1.1.27. 17,880.00
12 Pemasangan Pipa PVC AW diameter 1 1/2" m' A.5.1.1.28. 28,500.00
13 Pemasangan Pipa PVC AW diameter 2" m' A.5.1.1.29. 36,340.00
14 Pemasangan Pipa PVC AW diameter 2 1/2" m' A.5.1.1.30. 55,630.00
15 Pemasangan Pipa PVC AW diameter 3" m' A.5.1.1.31. 67,950.00
16 Pemasangan Pipa PVC AW diameter 4" m' A.5.1.1.32. 92,590.00
17 Pemasangan Kran Ø ½" atau Ø ¾" 1 bh A.5.1.1.19 66,010.00
18 (K3) Pemasangan 1 m Pipa HDPE ø 1,5" m' A.8.4.1.17.a 37,720.00
19 (K3) Pemasangan 1 m Pipa HDPE ø 2" m' A.8.4.1.17 53,900.00
20 (K3) Pemasangan 1 m Pipa HDPE ø 1/2" m' A.8.4.1.17.b 14,080.00
DAFTAR HARGA SATUAN BAHAN DAN UPAH
SURVEY HARGA+PAJAK
NO. URAIAN KODE SATUAN
(Rp.)
1 2 3 4 5
I. Bahan
1 Tanah Urug m3 75,000.00
2 Batu blondos M.05.a m3 300,000.00
3 Batu belah 10/15 M.05 m3 285,714.29 290,000.00
10 Batu pecah beton 2 / 3 M.02 m3 300,000.00 337,500.00
11 Pasir urug M.14.d m3 250,000.00 254,000.00
12 Pasir pasang / pasir beton M.14.a m3 314,285.71 319,000.00
13 Porland Cement (50 kg) M.15 zak 63,000.00 71,000.00
Besi dia. 8 53,000.00 60,000.00
Besi dia. 10 80,000.00 90,000.00
Besi dia. 13 150,000.00 169,000.00
14 Besi beton M.55.d kg 12,743.46
16 Kawat beton M.60 kg 20,000.00 22,500.00
17 Paku M.65 kg 20,000.00 22,500.00
Damdek kg 65,000.00 73,500.00
18 Pagar BRC 120x240 ø 8 bh 640,000.00
19 Kayu Kelas III M.35.e m3 4,500,000.00
Papan Cor 20,000.00 2,812,500.00
Usuk 2 m 20,000.00 3,214,285.71
Angkong 667,000.00 750,000.00
22 Cat Tembok kg 45,000.00 51,000.00
24 Minyak Begisting M.129 ltr 27,000.00
26 Multiplex 9 mm lbr 85,000.00 96,000.00
SURVEY HARGA+PAJAK
NO. URAIAN KODE SATUAN
(Rp.)
1 2 3 4 5
II. Pipa
1 GIP
DN 1/2 " meter 40,000.00
DN 3/4" meter 50,000.00
DN 1 " meter 70,833.33
DN 1 1/2 " meter 77,541.67
DN 2 " meter 160,000.00
DN 2 1/2 " meter 170,000.00
DN 3 " meter 238,000.00
DN 4" meter 244,208.33
2 Pipa PVC
Pipa 1/2 " meter 6,000.00
Pipa 3/4 " meter 7,500.00
Pipa 1 " meter 9,000.00
Pipa 1 1/2" meter 15,000.00
Pipa 2 " meter 22,000.00
Pipa 2 1/2 " meter 34,000.00
Pipa 3 " meter 45,000.00
Pipa 4 " meter 67,000.00
3 Rel Pipa
Pipa 1 " meter 42,150.00
4 Pipa HDPE
HDPE ø 1,5" m' 27,000.00
HDPE ø 2" m' 42,550.00
HDPE ø 1/2" m' 8,750.00
IV. Upah
1 Pekerja L. 01 hari 75,000.00
2 Tukang batu, besi dan cat L. 02 hari 85,000.00
3 Tukang pipa L. 02 hari 85,000.00
4 Tukang Kayu L. 02 hari 85,000.00
5 Kepala Tukang L. 03 hari -
6 Mandor L. 04 hari -
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
PROGRAM : PROGRAM PENGEMBANGAN DAN PENGELOLAAN JARINGAN IRIGASI, RAWA
DAN JARINGAN PENGAIRAN LAINNYA
SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/UPAH JUMLAH HARGA
I. Pekerjaan Tanah
A.4.1.1.7 1 m3 Membuat Beton mutu f'c=14,5 MPa (K225), slum (12±2)cm, w/c = 0,58
A TENAGA
L.01 1.650 oh Pekerja @Rp. 75,000.00 = Rp. 123,750.00
L.02 0.275 oh Tukang Batu @Rp. 85,000.00 = Rp. 23,375.00
L.03 0.028 oh Kepala Tukang @Rp. - = Rp. -
L.04 0.083 oh Mandor @Rp. - = Rp. -
JUMLAH TENAGA KERJA = Rp. 147,125.00
B BAHAN
M.15 371.000 Kg Portland Semen @ Rp. 1,420.00 = Rp. 526,820.00
M.14.a 698.000 kg Pasir Beton @ Rp. 227.86 = Rp. 159,044.29
SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/UPAH JUMLAH HARGA
C PERALATAN
1 Kg Pekerjaan Pembesian dengan Besi Polos atau Besi Ulir 0,1 x 148,381.35 = Rp. 14,838.14
A.4.7.1.10 1m2 Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar, 2 lap. Cat Penutup)
A TENAGA
L.01 0.020 oh Pekerja @ Rp. 75,000.00 = Rp. 1,500.00
L.02 0.063 oh Tukang Cat @ Rp. 85,000.00 = Rp. 5,355.00
L.03 0.006 oh Kepala Tukang @ Rp. - = Rp. -
L.04 0.003 oh Mandor @ Rp. - = Rp. -
JUMLAH TENAGA KERJA = Rp. 6,855.00
B BAHAN
0.100 Kg Plamir @Rp. - = Rp. -
0.100 Kg Cat Dasar @Rp. 51,000.00 = Rp. 5,100.00
0.260 Kg Cat Penutup 2 kali @Rp. 51,000.00 = Rp. 13,260.00
JUMLAH BAHAN = Rp. 18,360.00
C PERALATAN
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SATUAN SATUAN HARGA
(Rp.) (Rp.)
1 2 3 4 5 6
JUMLAH 260,252,500.00
PPN 11% 28,627,775.00
JUMLAH TOTAL 288,880,275.00
DIBULATKAN 288,880,000.00
TERBILANG : LIMA RATUS TUJUH BELAS JUTA DUA RATUS TIGA PULUH RIBU RUPIAH
Mengetahui/Menyetujui :
KEPALA DINAS PEKERJAAN UMUM, PERUMAHAN
DAN KAWASAN PERMUKIMAN
KABUPATEN TEMANGGUNG
HENDRA SUMARYANA, MT
Pembina Tingkat I
NIP. 19720224 199203 1 003