Anda di halaman 1dari 58

PROVINSI : SUMATERA UTARA

KABUPATEN : MANDAILING NATAL

RENCANA ANGGARAN BIAYA


( RAB )

NAMA KEGIATAN : PEMBANGUNAN MESJID JAMI' LINTAS TIMUR KOTASIANTAR

LOKASI : PANYABUNGAN

JUMLAH BIAYA : Rp. 2,325,000,000.00


(Dua Miliar Tiga Ratus Dua Puluh Lima Juta Rupiah,-)
CANA ANGGARAN BIAYA
( RAB )

PEMBANGUNAN MESJID JAMI' LINTAS TIMUR KOTASIANTAR


URAIAN DAFTAR KUANTITAS DAN HARGA

NAMA KEGIATAN : PEMBANGUNAN MESJID JAMI' LINTAS TIMUR KOTASIANTAR

LOKASI : PANYABUNGAN

JUMLAH HARGA
No. URAIAN PEKERJAAN
( Rp. )
1 2 3

A. PEKERJAAN PENDAHULUAN 3,264,913.00

B. PEKERJAAN MAYOR (STRUKTUR) #NAME?

### #NAME? #NAME?

### #NAME? #NAME?

### #NAME? 416,000,000.00

JUMLAH TOTAL #NAME?

Terbilang : (Dua Miliar Tiga Ratus Dua Puluh Lima Juta Rupiah,-)

Panyabungan, Januari 2014

Disetujui / Diketahui : Dibuat / Diperiksa :

PT. SORIK MARAPI GEOTHERMAL POWER KONSULTAN PERENCANA


CV. RANCANG BANGUN CONSULTANT

JOHN WHEBLE
Ir. BANGUN PASARIBU, MT
Presiden Direktur Direktur
RENCANA ANGGARAN BIAYA
NAMA KEGIATAN : PEMBANGUNAN MESJID JAMI' LINTAS TIMUR KOTASIANTAR

LOKASI : PANYABUNGAN

HARGA SATUAN
NO. URAIAN PEKERJAAN ANALISA VOLUME
( Rp. )
1 2 3 4 5

A. PEKERJAAN PENDAHULUAN
1 Pekerjaan Pembersihan Lokasi Ditaksir 800.00 M2 1,500.00
2 Pekerjaan Bouwplank Ditaksir 80.00 M1 10,000.00
3 Papan Nama royek Ditaksir 1.00 Ls 250,000.00
4 Photo Dokumentasi & Administrasi Proyek Ditaksir 1.00 Ls 1,014,913.00
Jumlah

JUMLAH A

B. PEKERJAAN MAYOR (STRUKTUR)


I. PEKERJAAN GALIAN & TIMBUNAN
1 Galian Tanah Ditaksir 275.63 M3 45,000.00
2 Timbunan Tanah Kembali Ditaksir 68.91 M3 11,250.00
3 Timbunan Tanah Ditaksir 800.00 M3 50,000.00
4 Urugan Pasir di Bawah Pondasi Ditaksir 9.15 M3 125,000.00
5 Lantai Kerja Ditaksir 9.15 M3 500,000.00
Jumlah
II. PEKERJAAN STUKTUR BETON BERTULANG
1 Pondasi Plat Kaki Ditaksir 154.68 M3 3,000,000.00
2 Balok Sloof Ditaksir 38.66 M 3
3,000,000.00
3 Kolom Lantai 01 Ditaksir 27.74 M3 3,000,000.00
4 Tangga Ke Lantai 02 Ditaksir 5.09 M3 3,000,000.00
5 Ring Balok Lantai 02 Ditaksir 34.59 M3 3,250,000.00
6 Plat Lantai 02 Ditaksir 34.71 M 3
3,250,000.00
7 Kolom Lantai 02 Ditaksir 27.74 M3 3,250,000.00
8 Ring Balok Atap Ditaksir 34.59 M3 3,500,000.00
9 Plat Atap Ditaksir 28.34 M3 3,500,000.00
10 Kubah Ditaksir 26.84 M 3
4,000,000.00
11 Menara Ditaksir 16.72 M3 4,500,000.00
12 Motif Lengkung Pada Kolom Ditaksir 15.79 M3 3,500,000.00
Jumlah

III. PEKERJAAN PASANGAN & PLESTERAN


1 Pasangan Batu Kali 1:4 Ditaksir 99.00 M3 700,000.00
2 Pas. Dinding Bata 1 : 4 Ditaksir 38.51 M3 850,000.00
3 Plasteran Bata 1 : 4 Ditaksir 770.18 M 2
40,000.00
Jumlah
IV. PEKERJAAN LANTAI
1 Urugan Pasir di Bawah Lantai Ditaksir 32.30 M3 125,000.00
2 Lantai Granit 100 x 100 CM Warna Ditaksir 480.00 M2 235,000.00
Jumlah
V. PEKERJAAN PINTU , JENDELA DAN PLAFOND
1 Pekerjaan Kusen Ditaksir 4.01 M3 3,000,000.00
2 Pekerjaan Pintu Panel Ditaksir 40.00 M2 250,000.00
3 Pekerjaan Jendela Panel Kaca Ditaksir 59.94 M 2
150,000.00
4 Pekerjaan Kunci & Gantungan
- Kunci Tanam (2 slaag) Ditaksir 16.00 Bh 325,000.00
1 2 3 4 5
- Engsel Pintu (Uk. 4") Ditaksir 16.00 Psg 78,000.00
- Pisher Ditaksir 16.00 Bh 10,000.00
- Grendel Pintu (Uk. 4") Ditaksir 16.00 Psg 26,000.00
- Engsel Jendela (Uk. 3") Ditaksir 52.00 Psg 26,000.00
- Grendel Jendela (Uk. 3") Ditaksir 52.00 Psg 15,600.00
- Hak Angin Lipat Ditaksir 52.00 Psg 26,000.00
- Handle Jendela Ditaksir 52.00 Bh 13,000.00
5 Pekerjaan Plafond Gypsum Ditaksir 420.00 M2 130,000.00
Jumlah
VI. PEKERJAAN CAT
1 Cat Kilat Ditaksir 329.11 M2 35,000.00
2 Cat Tembok Ditaksir 1,471.78 M2 25,000.00
Jumlah

JUMLAH B
C. PEKERJAAN MINOR
1 Pemasangan Batu Kerawang Motif Kubus Ditaksir 1.00 Ls 5,000,000.00
2 Relief Tiang Mihrab dan Plat Atap dan Menara Ditaksir 1.00 Ls 25,000,000.00
3 Mimbar Khotbah Ditaksir 1.00 Ls 20,000,000.00
4 Kubah Sudut Ditaksir 4.00 Bh 2,500,000.00
5 Logo Allah dan Bulan Bintang Ditaksir 2.00 Ls 2,000,000.00
6 Instalasi Listrik Ditaksir 1.00 Ls 20,000,000.00
7 Plumbing Bangunan Ditaksir 1.00 Ls 10,000,000.00
8 Bangunan MCK Ditaksir 1.00 Unit 100,000,000.00
9 Tangga Menara Dari Stainless Ditaksir 1.00 Ls 7,000,000.00
10 Pagar Stainless Pada Lantai 02 Ditaksir 1.00 Ls 25,000,000.00
11 Sound System Ditaksir 1.00 Ls 15,000,000.00
12 Landscape (Taman) Ditaksir 1.00 Ls 25,000,000.00
13 Pagar Mesjid Ditaksir 1.00 Ls 150,000,000.00
Jumlah

JUMLAH B

JUMLAH TOTAL

DIBULATKAN

Terbilang : (Dua Miliar Tiga Ratus Dua Puluh Lima Juta Rupiah,-)

Panyabungan, Januari 2014

Disetujui Diperiksa Dihitung / Disiapkan :


KETUA UMUM KETUA PELAKSANA PERENCANA

ADRI S HARTO DAHNIL AHMAD JAUHARI NASUTION

Diketahui Disetujui
LURAH KOTASIANTAR BENDAHARA

ERWIN, S.Si AHMAD LUBIS, S.Pdi


1 2 3 4 5
NIP. 19771116 200502 1 002 NIP. 19771116 200502 1 002
NCANA ANGGARAN BIAYA

JUMLAH HARGA
(
Rp. )
6

1,200,000.00
800,000.00
250,000.00
1,014,913.00
3,264,913.00

3,264,913.00

12,403,350.00
775,237.00
40,000,000.00
1,143,750.00
4,575,000.00
58,897,337.00

464,040,000.00
115,980,000.00
83,220,000.00
15,270,000.00
112,417,500.00
112,807,500.00
90,155,000.00
121,065,000.00
99,190,000.00
107,360,000.00
75,240,000.00
55,265,000.00
1,452,010,000.00

69,300,000.00
32,733,500.00
30,807,200.00
132,840,700.00

4,037,500.00
112,800,000.00
116,837,500.00

12,030,000.00
10,000,000.00
8,991,000.00

5,200,000.00
6
1,248,000.00
160,000.00
416,000.00
1,352,000.00
811,200.00
1,352,000.00
676,000.00
54,600,000.00
96,836,200.00

11,518,850.00
36,794,500.00
48,313,350.00

1,905,735,087.00

5,000,000.00
25,000,000.00
20,000,000.00
10,000,000.00
4,000,000.00
20,000,000.00
10,000,000.00
100,000,000.00
7,000,000.00
25,000,000.00
15,000,000.00
25,000,000.00
150,000,000.00
416,000,000.00

416,000,000.00

2,325,000,000.00

2,325,000,000.00

Panyabungan, Januari 2014

Dihitung / Disiapkan :

AHMAD JAUHARI NASUTION

AHMAD LUBIS, S.Pdi


6
NIP. 19771116 200502 1 002
DAFTAR PERHITUNGAN VOLUME

NAMA KEGIATAN : PEMBANGUNAN MESJID JAMI' LINTAS TIMUR KOTASIANTAR

LOKASI : PANYABUNGAN

A. PEKERJAAN PENDAHULUAN
1 pt Pekerjaan Pembersihan Lokasi Ukuran 20.00 x 40.00 = 800.00 M2
Jumlah = 800.00 M1
Dibulatkan = 800.00 M1

1 pt Pekerjaan Bouwplank Ukuran 2.00 x 16.00 = 32.00 M1


Ukuran 2.00 x 12.00 = 24.00 M1
Ukuran 4.00 x 3.00 = 12.00 M1
Ukuran 2.00 x 6.00 = 12.00 M1
Jumlah = 80.00 M1
Dibulatkan = 80.00 M1

Papan Nama royek = 1.00 Ls


Photo Dokumentasi & Administrasi Proyek = 1.00 Ls

B. PEKERJAAN MAYOR (STRUKTUR)


I. PEKERJAAN GALIAN & TIMBUNAN
Galian Tanah
38 pt Galian Pondasi Plat Kaki (I) Ukuran 2.75 x 1.50 x 1.50 = 235.13 M3
6 pt Galian Pondasi Plat Kaki (II) Ukuran 1.75 x 1.00 x 1.00 = 10.50 M3
1 pt Pondasi Dek Ukuran 1.00 x 1.00 x 30.00 = 30.00 M3
Jumlah = 275.63 M3
Dibulatkan = 275.63 M3
Timbunan Tanah Kembali
1 pt Timbunan Tanah Kembali Ukuran 0.25 x 275.63 = 68.91 M3
Jumlah = 68.91 M3
Dibulatkan = 68.91 M3
Timbunan Tanah
1 pt Timbunan Tanah Ukuran 1.00 x 20.00 x 40.00 = 800.00 M3
Jumlah = 800.00 M3
Dibulatkan = 800.00 M3
Urugan Pasir di Bawah Pondasi
38 pt Urugan Pasir di Bawah Pondasi Ukuran 0.10 x 1.50 x 1.50 = 8.55 M3
6 pt Urugan Pasir di Bawah Pondasi Ukuran 0.10 x 1.00 x 1.00 = 0.60 M3
Jumlah = 9.15 M3
Dibulatkan = 9.15 M3
Lantai Kerja
38 pt Lantai Kerja Ukuran 0.10 x 1.50 x 1.50 = 8.55 M3
6 pt Lantai Kerja Ukuran 0.10 x 1.00 x 1.00 = 0.60 M3
Jumlah = 9.15 M3
Dibulatkan = 9.15 M3
II. PEKERJAAN STUKTUR BETON BERTULANG
Pondasi Plat Kaki
38 pt Pondasi Plat Kaki (I) Ukuran 1.50 x 1.50 x 0.75 = 64.13 M3
38 pt Pondasi Plat Kaki (I) Ukuran 1.05 x 1.05 x 0.50 = 20.95 M3
38 pt Pondasi Plat Kaki (I) Ukuran 0.60 x 0.60 x 4.40 = 60.19 M3
6 pt Pondasi Plat Kaki (II) Ukuran 1.00 x 1.00 x 0.50 = 3.00 M3
6 pt Pondasi Plat Kaki (II) Ukuran 0.75 x 0.75 x 0.30 = 1.01 M3
6 pt Pondasi Plat Kaki (II) Ukuran 0.50 x 0.50 x 3.60 = 5.40 M3
Jumlah = 154.68 M3
Dibulatkan = 154.68 M3
Balok Sloof
4 pt Balok Sloof 40x50 CM Ukuran 0.40 x 0.50 x 16.00 = 12.80 M3
14 pt Balok Sloof 40x50 CM Ukuran 0.40 x 0.50 x 2.00 = 5.60 M3
6 pt Balok Sloof 40x50 CM Ukuran 0.40 x 0.50 x 8.00 = 9.60 M3
2 pt Balok Sloof 40x50 CM Ukuran 0.40 x 0.50 x 1.75 = 0.70 M3
2 pt Balok Sloof 40x50 CM Ukuran 0.40 x 0.50 x 2.50 = 1.00 M3
8 pt Balok Sloof 40x50 CM Ukuran 0.40 x 0.50 x 2.60 = 4.16 M3
2 pt Balok Sloof 40x50 CM Ukuran 0.40 x 0.50 x 6.00 = 2.40 M3
4 pt Balok Sloof 40x50 CM Ukuran 0.40 x 0.50 x 3.00 = 2.40 M3
Jumlah = 38.66 M3
Dibulatkan = 38.66 M3
Kolom Lantai 01
28 pt Kolom 40x40 CM Ukuran 0.40 x 0.40 x 4.05 = 18.14 M3
16 pt Kolom 40x40 CM Ukuran 0.40 x 0.40 x 3.75 = 9.60 M3
Jumlah = 27.74 M3
Dibulatkan = 27.74 M3
Ring Balok Lantai 02
2 pt Ring Balok 40x50 CM Ukuran 0.40 x 0.35 x 16.00 = 4.48 M3
2 pt Ring Balok 40x50 CM Ukuran 0.40 x 0.35 x 12.00 = 3.36 M3
18 pt Ring Balok 40x50 CM Ukuran 0.40 x 0.35 x 2.00 = 5.04 M3
2 pt Ring Balok 40x50 CM Ukuran 0.40 x 0.35 x 1.75 = 0.49 M3
5 pt Ring Balok 40x80 CM Ukuran 0.40 x 0.65 x 8.00 = 10.40 M3
16 pt Ring Balok 40x80 CM Ukuran 0.40 x 0.65 x 2.60 = 10.82 M3
Jumlah = 34.59 M3
Dibulatkan = 34.59 M3
Plat Lantai 02
1 pt Plat Lantai t. 15 cm Ukuran 0.15 x 12.40 x 16.40 = 30.50 M3
1 pt Plat Level Ukuran 0.15 x 1.00 x 44.00 = 6.60 M3
= 37.10 M3
Vide
1 pt Vide Ukuran 0.15 x 5.60 x 2.85 = 2.39 M3
Plat Lantai 02 - Vide 37.10 - 2.39 = 34.71 M3
Jumlah = 34.71 M3
Dibulatkan = 34.71 M3
Tangga Ke Lantai 02
44 pt Anak Tangga Ukuran 0.20 x 0.30 x 1.20 = 3.17 M3
2 pt Balok Tangga Ukuran 0.30 x 0.40 x 8.00 = 1.92 M3
Jumlah = 5.09 M3
Dibulatkan = 5.09 M3
Kolom Lantai 02
28 pt Kolom 40x40 CM Ukuran 0.40 x 0.40 x 4.05 = 18.14 M3
16 pt Kolom 40x40 CM Ukuran 0.40 x 0.40 x 3.75 = 9.60 M3
Jumlah = 27.74 M3
Dibulatkan = 27.74 M3
Ring Balok Atap
2 pt Ring Balok 40x50 CM Ukuran 0.40 x 0.35 x 16.00 = 4.48 M3
2 pt Ring Balok 40x50 CM Ukuran 0.40 x 0.35 x 12.00 = 3.36 M3
18 pt Ring Balok 40x50 CM Ukuran 0.40 x 0.35 x 2.00 = 5.04 M3
2 pt Ring Balok 40x50 CM Ukuran 0.40 x 0.35 x 1.75 = 0.49 M3
5 pt Ring Balok 40x80 CM Ukuran 0.40 x 0.65 x 8.00 = 10.40 M3
16 pt Ring Balok 40x80 CM Ukuran 0.40 x 0.65 x 2.60 = 10.82 M3
Jumlah = 34.59 M3
Dibulatkan = 34.59 M3
Plat Atap
1 pt Plat Atap t. 10 cm Ukuran 0.10 x 14.40 x 18.40 = 26.50 M3
2 pt Plat Atap t. 10 cm Ukuran 0.10 x 2.50 x 7.40 = 3.70 M3
2 pt Plat Atap t. 10 cm Ukuran 0.10 x 1.00 x 12.00 = 2.40 M3
= 32.60 M3
Vide
1 pt Vide Ukuran 0.10 x 5.60 x 7.60 = 4.26 M3
Plat Atap - Vide 32.60 - 4.26 = 28.34 M3
Jumlah = 28.34 M3
Dibulatkan = 28.34 M3

Kubah
2 pt Ring Balok 40x80 CM Ukuran 0.40 x 0.70 x 5.60 = 3.14 M3
2 pt Ring Balok 40x80 CM Ukuran 0.40 x 0.70 x 7.60 = 4.26 M3
2 pt Ring Balok 40x50 CM Ukuran 0.40 x 0.50 x 5.60 = 2.24 M3
2 pt Ring Balok 40x50 CM Ukuran 0.40 x 0.50 x 7.60 = 3.04 M3
1 pt Ring Balok 40x50 CM Ukuran 0.40 x 0.50 x 23.50 = 4.70 M3
1 pt Level Kubah Ukuran 0.15 x 1.20 x 26.40 = 4.75 M3
1 pt Kubah Ukuran 3.14 x 7.50 x 0.10 x 2 = 4.71 M3
Jumlah = 26.84 M3
Dibulatkan = 26.84 M3
Menara
5 pt Kolom 40x40 CM Ukuran 0.40 x 0.40 x 8.00 = 6.40 M3
5 pt Balok 30x30 CM Ukuran 0.30 x 0.30 x 11.50 = 5.18 M3
5 pt Ring Balok 20x20 CM Ukuran 0.20 x 0.20 x 1.15 = 0.23 M3
5 pt Balok 15x20 CM Ukuran 0.15 x 0.20 x 9.00 = 1.35 M3
5 pt Plat level Ukuran 0.10 x 11.50 x 0.50 = 2.88 M3
1 pt Plat level Ukuran 0.10 x 9.00 x 0.50 = 0.45 M3
1 pt Plat level Ukuran 0.10 x 9.00 x 0.25 = 0.23 M3
Jumlah = 16.72 M3
Dibulatkan = 16.72 M3
Motif Lengkung Pada Kolom
16 pt Motif Lengkung Pada Kolom Ukuran 0.10 x 0.20 x 9.15 = 2.93 M3
10 pt Motif Lengkung Pada Kolom Ukuran 0.10 x 0.20 x 6.50 = 1.30 M3
4 pt Motif Lengkung Pada Kolom Ukuran 0.10 x 0.20 x 9.35 = 0.75 M3
14 pt Motif Lengkung Pada Kolom Ukuran 0.20 x 0.50 x 6.50 = 9.10 M3
2 pt Motif Lengkung Pada Kolom Ukuran 0.20 x 0.50 x 5.40 = 1.08 M3
2 pt Motif Lengkung Pada Kolom Ukuran 0.20 x 0.50 x 3.15 = 0.63 M3
Jumlah = 15.79 M3
Dibulatkan = 15.79 M3

III. PEKERJAAN PASANGAN & PLESTERAN


Pasangan Batu Kali 1:4
1 pt Pasangan Batu Kali 1:4 Ukuran 1.00 x 1.20 x 30.00 = 36.00 M3
1 pt Pasangan Batu Kali 1:4 Ukuran 0.70 x 3.00 x 30.00 = 63.00 M3
Jumlah = 99.00 M3
Dibulatkan = 99.00 M3
Luas Dinding
8 pt Pas. Bt. Bata Dinding Ukuran 4.40 x 2.00 = 70.40 M2
18 pt Pas. Bt. Bata Dinding Ukuran 4.40 x 3.00 = 237.60 M2
4 pt Pas. Bt. Bata Dinding Ukuran 4.40 x 1.75 = 30.80 M2
2 pt Pas. Bt. Bata Dinding Ukuran 1.00 x 8.00 = 16.00 M2
2 pt Pas. Bt. Bata Dinding Ukuran 1.00 x 6.00 = 12.00 M2
4 pt Pas. Bt. Bata Dinding Ukuran 0.75 x 6.00 = 18.00 M2
5 pt Pas. Bt. Bata Dinding Ukuran 1.60 x 11.50 = 92.00 M2
4 pt Pas. Bt. Bata Dinding Ukuran 1.20 x 11.50 = 55.20 M2
1 pt Pas. Bt. Bata Dinding Ukuran 0.50 x 9.00 = 4.50 M2
2 pt Pas. Bt. Bata Dinding Ukuran 7.00 x 12.00 = 168.00 M2
Jumlah = 536.50 M2
Dibulatkan (A) = 536.50 M2
Luas Bukaan
16 pt Pintu Ukuran 1.10 x 2.65 = 46.64 M2
8 pt Jendela Type I Ukuran 2.00 x 2.15 = 34.40 M2
12 pt Jendela Type II Ukuran 1.35 x 2.15 = 34.83 M2
4 pt Jendela Type III Ukuran 1.35 x 3.10 = 16.74 M2
72 pt Ventilasi Type I Ukuran 0.30 x 0.50 = 10.80 M2
20 pt Ventilasi Type II Ukuran 0.50 x 0.80 = 8.00 M2
20 pt Ventilasi Type II Ukuran 0.50 x 0.80 = 8.00 M2
8 pt Ventilasi Tahu Ukuran 1.00 x 2.68 = 21.40 M2
4 pt Ventilasi Tahu Ukuran 0.75 x 2.68 = 8.02 M2
Jumlah = 151.41 M2
Dibulatkan (B) = 151.41 M2

Pasangan Dinding Batu Bata 1 : 4


1 pt Pasangan Batu Bata Ukuran A - B x 0.10
= 536.50 - 151.41 x 0.10 = 38.51 M3
Jumlah = 38.51 M3
Dibulatkan = 38.51 M3
Plesteran Dinding Batu Bata
1 pt Plasteran Ukuran 536.50 - 151.41 x 2.00 = 770.18 M2
Jumlah = 770.18 M2
Dibulatkan = 770.18 M2

IV. PEKERJAAN LANTAI


Urugan Pasir di Bawah Lantai
1 pt Urugan Pasir di Lantai Ukuran 0.10 x 13.20 x 17.20 = 22.70 M3
1 pt Urugan Pasir di Lantai Ukuran 0.05 x 12.00 x 16.00 = 9.60 M3
Jumlah = 32.30 M3
Dibulatkan = 32.30 M3
Lantai Granit 100 x 100 CM Warna
1 pt Lantai Granit 100 x 100 CM Warna Ukuran 13.20 x 17.20 = 227.04 M2
2 pt Lantai Granit 100 x 100 CM Warna Ukuran 0.20 x 60.80 = 24.32 M2
1 pt Lantai Granit 100 x 100 CM Warna Ukuran 12.00 x 16.00 = 192.00 M2
2 pt Lantai Granit 100 x 100 CM Warna Ukuran 3.00 x 6.00 = 36.00 M2
Jumlah = 479.36 M2
Dibulatkan = 480.00 M2

V. PEKERJAAN PINTU , JENDELA DAN PLAFOND


Pekerjaan Kusen
16 pt Pintu Ukuran 0.05 x 0.15 x 7.30 = 0.88 M3
8 pt Jendela Type I Ukuran 0.05 x 0.15 x 14.00 = 0.84 M3
12 pt Jendela Type II Ukuran 0.05 x 0.15 x 10.05 = 0.90 M3
4 pt Jendela Type III Ukuran 0.02 x 0.15 x 11.60 = 0.14 M3
72 pt Ventilasi Type I Ukuran 0.05 x 0.15 x 1.60 = 0.86 M3
20 pt Ventilasi Type II Ukuran 0.05 x 0.15 x 2.60 = 0.39 M3
Jumlah = 4.01 M3
Dibulatkan = 4.01 M3
Pekerjaan Pintu Panel
16 pt Pintu Pintu Ukuran 1.00 x 2.50 = 40.00 M2
Jumlah = 40.00 M2
Dibulatkan = 40.00 M2
Pekerjaan Jendela Panel Kaca
24 pt Jendela Type I Ukuran 0.60 x 1.50 = 21.60 M2
24 pt Jendela Type II Ukuran 0.60 x 1.50 = 21.60 M2
4 pt Jendela Type III Ukuran 1.35 x 3.10 = 16.74 M2
Jumlah = 59.94 M2
Dibulatkan = 59.94 M2

Pekerjaan Kunci & Gantungan


Kunci Tanam (2 slaag) = 16.00 Bh
Engsel Pintu (Uk. 4") = 16.00 Psg
Pisher 16.00 Bh
Grendel Pintu (Uk. 4") = 16.00 Psg
Engsel Jendela (Uk. 3") = 52.00 Psg
Grendel Jendela (Uk. 3") = 52.00 Psg
Hak Angin Lipat = 52.00 Psg
Handle Jendela = 52.00 Bh
Pekerjaan Plafond Gypsum
2 pt Plafond Ukuran 12.00 x 16.00 = 384.00 M2
2 pt Plafond Ukuran 3.00 x 6.00 = 36.00 M2
Jumlah = 420.00 M2
Dibulatkan = 420.00 M2

VI. PEKERJAAN CAT


Cat Kilat
Kozen Pintu & Jendela
16 pt Pintu Ukuran 0.40 x 7.30 = 46.72 M2
8 pt Jendela Type I Ukuran 0.40 x 14.00 = 44.80 M2
12 pt Jendela Type II Ukuran 0.40 x 10.05 = 48.24 M2
4 pt Jendela Type III Ukuran 0.34 x 11.60 = 15.78 M2
72 pt Ventilasi Type I Ukuran 0.40 x 1.60 = 46.08 M2
20 pt Ventilasi Type II Ukuran 0.40 x 2.60 = 20.80 M2

Pekerjaan Pintu Panel


16 pt Pintu Pintu Ukuran 5.00 + 0.25 = 83.92 M2

Pekerjaan Jendela Panel Kaca


24 pt Jendela Type I Ukuran 1.80 x 0.19 = 8.21 M6
24 pt Jendela Type II Ukuran 1.80 x 0.19 = 8.21 M6
4 pt Jendela Type III Ukuran 8.37 x 0.19 = 6.36 M6
Jumlah = 329.11 M2
Dibulatkan = 329.11 M2
Cat Tembok
1 pt Dinding Tembok Ukuran 1.00 x 770.18 = 770.18 M2
1 pt Kolom Ukuran 1.60 x 176.00 = 281.60 M2
1 pt Plafond Ukuran 1.00 x 420.00 = 420.00 M2
Jumlah = 1,471.78 M2
Dibulatkan = 1,471.78 M2
IX. PEKERJAAN MINOR
Pemasangan Batu Kerawang Motif Kubus = 1.00 Ls
Relief Tiang Mihrab dan Plat Atap dan Menara = 1.00 Ls
Mimbar Khotbah = 1.00 Ls
Kubah Sudut = 4.00 Ls
Logo Allah dan Bulan Bintang = 1.00 Ls
Instalasi Listrik = 1.00 Ls
Plumbing Bangunan = 1.00 Ls
Bangunan MCK = 1.00 Unit
Tangga Menara Dari Stainless = 1.00 Ls
Pagar Stainless Pada Lantai 02 = 1.00 Ls
Sound System = 1.00 Ls
Landscape (Taman) = 1.00 Ls
Pagar Mesjid = 1.00 Ls

Panyabungan, Januari 2014

Diperiksa Dihitung / Disiapkan :


KETUA PELAKSANA PERENCANA

DAHNIL AHMAD JAUHARI NASUTION


TIME SCHEDULE

KEGIATAN : ###

PAKET PEKERJAAN : PEMBANGUNAN MESJID JAMI' LINTAS TIMUR KOTASIANTAR


-

LOKASI : PANYABUNGAN

TAHUN ANGGARAN : ###

BULAN I BULAN II BULAN III BULAN IV BULAN V BULAN VI BULAN VII BULAN VIII BULAN IX
NO. URAIAN BOBOT MINGGU KE MINGGU KE MINGGU KE MINGGU KE MINGGU KE MINGGU KE MINGGU KE MINGGU KE MINGGU KE KET
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

A. PEKERJAAN PENDAHULUAN
1 Pekerjaan Pembersihan Lokasi 0.052 0.026 0.026 100 %
2 Pekerjaan Bouwplank 0.034 0.034
### #NAME? #NAME? #NAME?
3 Papan Nama royek 0.011 0.011
### #NAME? #NAME? #NAME?
4 Photo Dokumentasi & Administrasi Proyek 0.044 0.011 0.011 0.011 0.011
B. PEKERJAAN MAYOR (STRUKTUR)
I. PEKERJAAN GALIAN & TIMBUNAN
1 Galian Tanah 0.534 0.534
2 Timbunan Tanah Kembali 0.033 0.033
3 Timbunan Tanah 1.720 1.720
### #NAME?
4 Urugan Pasir di Bawah Pondasi 0.049 0.010 0.039
5 Lantai Kerja 0.197 0.197
### #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME? #NAME?
II. PEKERJAAN STUKTUR BETON BERTULANG
1 Pondasi Plat Kaki 19.959 9.480 10.478
2 Balok Sloof 4.988 2.369 2.619
### #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME? #NAME?
3 Kolom Lantai 01 3.579 0.895 1.790 0.895
5 Ring Balok Lantai 02 4.835 1.209 2.418 1.209
6 Plat Lantai 02 4.852 1.213 2.426 1.213
7 Kolom Lantai 02 3.878 0.969 1.939 0.969
8 Ring Balok Atap 5.207 1.302 2.604 1.302
9 Plat Atap 4.266 2.133 2.133
10 Kubah 4.618 4.618
11 Menara 3.236 3.236 50 %
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME? #NAME?
III. PEKERJAAN PASANGAN & PLESTERAN
2 Pas. Dinding Bata 1 : 4 1.408 0.352 0.563 0.493
3 Plasteran Bata 1 : 4 1.325 0.397 0.928
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
IV. PEKERJAAN LANTAI
1 Urugan Pasir di Bawah Lantai 0.174 0.174
### #NAME? #NAME? #NAME? #NAME?
2 Lantai Granit 100 x 100 CM Warna 4.852 3.881 0.970
### #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
V. PEKERJAAN PINTU , JENDELA DAN PLAFOND
1 Pekerjaan Kusen 0.517 0.517
2 Pekerjaan Pintu Panel 0.430 0.430

### #NAME? #NAME? #NAME?


3 Pekerjaan Jendela Panel Kaca 0.387 0.387
4 Pekerjaan Kunci & Gantungan
- Kunci Tanam (2 slaag) 0.224 0.224
- Engsel Pintu (Uk. 4") 0.054 0.054
- Pisher 0.007 0.007
- Grendel Pintu (Uk. 4") 0.018 0.018
- Engsel Jendela (Uk. 3") 0.058 0.058
- Grendel Jendela (Uk. 3") 0.035 0.035
- Hak Angin Lipat 0.058 0.058
- Handle Jendela 0.029 0.029
### #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
5 Pekerjaan Plafond Gypsum 2.348 1.644 0.705
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
VI. PEKERJAAN CAT
1 Cat Kilat 0.495 0.372 0.124
2 Cat Tembok 1.583 1.187 0.396
C. PEKERJAAN MINOR
1 Pemasangan Batu Kerawang Motif Kubus 0.215 0.215
2 Relief Tiang Mihrab dan Plat Atap dan Menara 1.075 1.075
3 Mimbar Khotbah 0.860 0.860
6 Instalasi Listrik 0.860 0.860
7 Plumbing Bangunan 0.430 0.430 50 %
8 Bangunan MCK 4.301 4.301
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME?
### #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?

### #NAME?
### #NAME? #NAME? #NAME?
### #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME?
### #NAME? #NAME? #NAME?
### #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME?
### #NAME? #NAME? #NAME?
### #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
D. PEKERJAAN PEMELIHARAAN 0%

JUMLAH TOTAL #NAME?


TARGET RENCANA
RENCANA #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
RENCANA KOMULATIF #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
REALISASI MINGGU INI
REALISASI S/D MINGGU INI
DEVIASI

Panyabungan, Januari 2014

Diperiksa Dihitung / Disiapkan :

KETUA PELAKSANA PERENCANA


0
DAHNIL AHMAD JAUHARI NASUTION
- 0
DAFTAR ANALISA

NAMA KEGIATAN : PEMBANGUNAN MESJID JAMI' LINTAS TIMUR KOTASIANTAR

LOKASI : PANYABUNGAN

ANL. A.1 1 M3 GALIAN TANAH BIASA

0.7500 Pekerja Terampil @Rp. 80,000.00 = Rp. 60,000.00


0.0250 Mandor @Rp. 100,000.00 = Rp. 2,500.00
Jumlah = Rp. 62,500.00
Di bulatkan = Rp. 62,500.00

1 M3 TIMBUN TANAH KEMBALI 1/4 ANL. A1 x 62,500.00 = Rp. 15,625.00


Di bulatkan = Rp. 15,625.00

ANL. A.18 1 M3 TIMBUNAN PASIR UNTUK ALAS LANTAI

1.2000 M3 Pasir Timbun @Rp. 120,000.00 = Rp. 144,000.00


0.3000 Pekerja Terampil @Rp. 80,000.00 = Rp. 24,000.00
0.0100 Mandor @Rp. 100,000.00 = Rp. 1,000.00
Jumlah = Rp. 169,000.00
Dibulatkan = Rp. 169,000.00

ANL. A.18a 1 M3 TIMBUNAN TANAH

1.2000 M3 Tanah Timbun @Rp. 50,000.00 = Rp. 60,000.00


0.3000 Pekerja Terampil @Rp. 80,000.00 = Rp. 24,000.00
0.0100 Mandor @Rp. 100,000.00 = Rp. 1,000.00
Jumlah = Rp. 85,000.00
Dibulatkan = Rp. 85,000.00

ANL. A.18b 1 M3 TIMBUNAN SIRTU

1.2000 M3 Sirtu @Rp. 150,000.00 = Rp. 180,000.00


0.3000 Pekerja Terampil @Rp. 80,000.00 = Rp. 24,000.00
0.0100 Mandor @Rp. 100,000.00 = Rp. 1,000.00
Jumlah = Rp. 205,000.00
Dibulatkan = Rp. 205,000.00

ANL. A.18.c 1 M3 TIMBUNAN KERIKIL

1.2000 M3 Batu Kerikil @Rp. 200,000.00 = Rp. 240,000.00


0.3000 Pekerja Terampil @Rp. 80,000.00 = Rp. 24,000.00
0.0100 Mandor @Rp. 100,000.00 = Rp. 1,000.00
Jumlah = Rp. 265,000.00
Dibulatkan = Rp. 265,000.00

ANL. G. 2 1 M3 PASANGAN BATU KOSONG

1.0000 M3 Batu Kali @Rp. 180,000.00 = Rp. 180,000.00


1.5000 Pekerja Terampil @Rp. 80,000.00 = Rp. 120,000.00
0.0750 Mandor @Rp. 100,000.00 = Rp. 7,500.00
Jumlah = Rp. 307,500.00
Dibulatkan = Rp. 307,500.00
ANL. G. 32. h 1 M3 PASANGAN BATU KALI CAMP. 1 PC : 4 PC

1.2000 M3 Batu Kali @Rp. 180,000.00 = Rp. 216,000.00


3.2560 Zak PC @ 50 Kg @Rp. 65,000.00 = Rp. 211,640.00
0.5200 1 M3 Pasir Pasang @Rp. 150,000.00 = Rp. 78,000.00
1.2000 Tukang @Rp. 120,000.00 = Rp. 144,000.00
0.1200 Kepala Tukang @Rp. 150,000.00 = Rp. 18,000.00
3.6000 Pekerja Terampil @Rp. 80,000.00 = Rp. 288,000.00
0.1800 Mandor @Rp. 100,000.00 = Rp. 18,000.00
Jumlah = Rp. 973,640.00
Dibulatkan = Rp. 973,640.00

ANL. G. 33. h 1 M3 PASANGAN DINDING BATU CAMP. 1 PC : 4 PS

800.0000 Bh Batu Bata @Rp. 600.00 = Rp. 480,000.00


2.5330 Zak PC @ 50 Kg @Rp. 65,000.00 = Rp. 164,645.00
0.4060 1 M3 Pasir Pasang @Rp. 150,000.00 = Rp. 60,900.00
1.5000 Tukang @Rp. 120,000.00 = Rp. 180,000.00
0.1500 Kepala Tukang @Rp. 150,000.00 = Rp. 22,500.00
4.5000 Pekerja Terampil @Rp. 80,000.00 = Rp. 360,000.00
0.2250 Mandor @Rp. 100,000.00 = Rp. 22,500.00
Jumlah = Rp. 1,290,545.00
Dibulatkan = Rp. 1,290,545.00

ANL. G. 50.q 1 M2 PLESTERAN CAMP. 1 PC : 4PS

0.1428 Zak PC @ 50 Kg @Rp. 65,000.00 = Rp. 9,282.00


0.0114 1 M3 Pasir Pasang @Rp. 150,000.00 = Rp. 1,710.00
0.0150 Tukang @Rp. 120,000.00 = Rp. 1,800.00
0.0150 Kepala Tukang @Rp. 150,000.00 = Rp. 2,250.00
0.4000 Pekerja Terampil @Rp. 80,000.00 = Rp. 32,000.00
0.0200 Mandor @Rp. 100,000.00 = Rp. 2,000.00
Jumlah = Rp. 49,041.80
Dibulatkan = Rp. 49,041.00

ANL. G. 50.i 1 M2 PLESTERAN CAMP. 1 PC : 3PS

0.1630 Zak PC @ 50 Kg @Rp. 65,000.00 = Rp. 10,595.00


0.0194 1 M3 Pasir Pasang @Rp. 150,000.00 = Rp. 2,910.00
0.2000 Tukang @Rp. 120,000.00 = Rp. 24,000.00
0.0200 Kepala Tukang @Rp. 150,000.00 = Rp. 3,000.00
0.4000 Pekerja Terampil @Rp. 80,000.00 = Rp. 32,000.00
0.0200 Mandor @Rp. 100,000.00 = Rp. 2,000.00
Jumlah = Rp. 74,504.80
Dibulatkan = Rp. 74,504.00

ANL. G. 39 1 M3 COR LANTAI KERJA

1.0000 M3 Kerikil @Rp. 200,000.00 = Rp. 200,000.00


0.2470 Kapur Batu @Rp. 6,000.00 = Rp. 1,482.00
0.2470 Zak PC @ 50 Kg @Rp. 65,000.00 = Rp. 16,055.00
0.2470 1 M3 Pasir Pasang @Rp. 150,000.00 = Rp. 37,050.00
0.5000 Tukang @Rp. 120,000.00 = Rp. 60,000.00
0.0500 Kepala Tukang @Rp. 150,000.00 = Rp. 7,500.00
6.0000 Pekerja Terampil @Rp. 80,000.00 = Rp. 480,000.00
0.3000 Mandor @Rp. 100,000.00 = Rp. 30,000.00
Jumlah = Rp. 832,087.00
Dibulatkan = Rp. 832,087.00

ANL. G. 41 1 M3 BETON COR 1 : 2 : 3

0.8200 M3 Kerikil @Rp. 200,000.00 = Rp. 164,000.00


6.8000 Zak PC @ 50 Kg @Rp. 65,000.00 = Rp. 442,000.00
0.5000 1 M3 Pasir Pasang @Rp. 150,000.00 = Rp. 75,000.00
1.0000 Tukang @Rp. 120,000.00 = Rp. 120,000.00
0.1000 Kepala Tukang @Rp. 150,000.00 = Rp. 15,000.00
6.0000 Pekerja Terampil @Rp. 80,000.00 = Rp. 480,000.00
0.3000 Mandor @Rp. 100,000.00 = Rp. 30,000.00
Jumlah = Rp. 1,326,000.00
Dibulatkan = Rp. 1,326,000.00

ANL. G. 43.a 1 M3 BETON COR 1 : 3 : 5

0.9100 M3 Kerikil @Rp. 200,000.00 = Rp. 182,000.00


4.5400 Zak PC @ 50 Kg @Rp. 65,000.00 = Rp. 295,100.00
0.5400 1 M3 Pasir Pasang @Rp. 150,000.00 = Rp. 81,000.00
0.5000 Tukang @Rp. 120,000.00 = Rp. 60,000.00
0.0500 Kepala Tukang @Rp. 150,000.00 = Rp. 7,500.00
6.0000 Pekerja Terampil @Rp. 80,000.00 = Rp. 480,000.00
0.3000 Mandor @Rp. 100,000.00 = Rp. 30,000.00
Jumlah = Rp. 1,135,600.00
Dibulatkan = Rp. 1,135,600.00

I.2 MEMOTONG, MEMASANG DAN MENGERJAKAN BESI / 100 Kg

9.0000 Tukang @Rp. 120,000.00 = Rp. 1,080,000.00


3.0000 Kepala Tukang @Rp. 150,000.00 = Rp. 450,000.00
9.0000 Pekerja Terampil @Rp. 80,000.00 = Rp. 720,000.00
Jumlah = Rp. 2,250,000.00

0.5000 Upah @Rp. 2,250,000.00 = Rp. 1,125,000.00


110.0000 Kg. Besi Beton @Rp. 10,500.00 = Rp. 1,155,000.00
2.0000 Kg. Kawat Beton @Rp. 25,000.00 = Rp. 50,000.00
Jumlah = Rp. 2,330,000.00

Untuk 1 Kg Jumlah = Rp. 23,300.00


Dibulatkan = Rp. 23,300.00

F.8 10 M2 PAPAN BEKESTING

Ubah Cetakan / M2
0.5000 Tukang @Rp. 120,000.00 = Rp. 60,000.00
0.0500 Kepala Tukang @Rp. 150,000.00 = Rp. 7,500.00
0.2000 Pekerja Terampil @Rp. 80,000.00 = Rp. 16,000.00
0.0100 Mandor @Rp. 100,000.00 = Rp. 1,000.00
Jumlah = Rp. 84,500.00

Untuk 10 M2 = Rp. 845,000.00


4.0000 Kg. Paku @Rp. 15,000.00 = Rp. 60,000.00
0.4000 M3 Kayu K. III @Rp. 3,000,000.00 = Rp. 1,200,000.00
Jumlah = Rp. 2,105,000.00

Untuk 1 M2 Jumlah = Rp. 210,500.00


Dibulatkan = Rp. 210,500.00

SUPL. V. PT 1 M3 BETON BERTULANG PONDASI SETEMPAT (PT, 80x80x25 CM)

12.5000 Analisa F. 8 @Rp. 210,500.00 = Rp. 2,631,250.00


1.0000 Analisa G. 41 @Rp. 1,326,000.00 = Rp. 1,326,000.00
144.2445 Analisa I. 2 @Rp. 23,300.00 = Rp. 3,360,896.85
Jumlah = Rp. 7,318,146.85
Dibulatkan = Rp. 7,318,146.00
SUPL. V. K.1 1 M3 BETON BERTULANG KOLOM K.1 (K1, 25x25 CM)
8.0000 Analisa F. 8 @Rp. 210,500.00 = Rp. 1,684,000.00
1.0000 Analisa G. 41 @Rp. 1,326,000.00 = Rp. 1,326,000.00
104.9454 Analisa I. 2 @Rp. 23,300.00 = Rp. 2,445,227.82
Jumlah = Rp. 5,455,227.82
Dibulatkan = Rp. 5,455,227.00

SUPL. V. K.2 1 M3 BETON BERTULANG KOLOM K.2 (K2, 20x20 CM)

10.0000 Analisa F. 8 @Rp. 210,500.00 = Rp. 2,105,000.00


1.0000 Analisa G. 41 @Rp. 1,326,000.00 = Rp. 1,326,000.00
76.6778 Analisa I. 2 @Rp. 23,300.00 = Rp. 1,786,592.74
Jumlah = Rp. 5,217,592.74
Dibulatkan = Rp. 5,217,592.00

SUPL. V. K.P 1 M3 BETON BERTULANG KOLOM PRAKTIS K.P (KP, 15x15 CM)

13.3333 Analisa F. 8 @Rp. 210,500.00 = Rp. 2,806,659.65


1.0000 Analisa G. 41 @Rp. 1,326,000.00 = Rp. 1,326,000.00
148.5138 Analisa I. 2 @Rp. 23,300.00 = Rp. 3,460,371.54
Jumlah = Rp. 7,593,031.19
Dibulatkan = Rp. 7,593,031.00

SUPL. V. S.1 1 M3 BETON BERTULANG SLOOF S.1 (S1, 20x30 CM)

5.0000 Analisa F. 8 @Rp. 210,500.00 = Rp. 1,052,500.00


1.0000 Analisa G. 41 @Rp. 1,326,000.00 = Rp. 1,326,000.00
84.5574 Analisa I. 2 @Rp. 23,300.00 = Rp. 1,970,187.42
Jumlah = Rp. 4,348,687.42
Dibulatkan = Rp. 4,348,687.00

SUPL. V. S.2 1 M3 BETON BERTULANG SLOOF S.2 (S2, 15x20 CM)

6.6667 Analisa F. 8 @Rp. 210,500.00 = Rp. 1,403,340.35


1.0000 Analisa G. 41 @Rp. 1,326,000.00 = Rp. 1,326,000.00
112.1514 Analisa I. 2 @Rp. 23,300.00 = Rp. 2,613,127.62
Jumlah = Rp. 5,342,467.97
Dibulatkan = Rp. 5,342,467.00

SUPL. V. B.1 1 M3 BETON BERTULANG BALOK B.1 (B1, 20x30 CM)

6.6667 Analisa F. 8 @Rp. 210,500.00 = Rp. 1,403,340.35


1.0000 Analisa G. 41 @Rp. 1,326,000.00 = Rp. 1,326,000.00
114.3988 Analisa I. 2 @Rp. 23,300.00 = Rp. 2,665,492.04
Jumlah = Rp. 5,394,832.39
Dibulatkan = Rp. 5,394,832.00

SUPL. V. B.2 1 M3 BETON BERTULANG BALOK B.2 (B2, 15x20 CM)

9.1667 Analisa F. 8 @Rp. 210,500.00 = Rp. 1,929,590.35


1.0000 Analisa G. 41 @Rp. 1,326,000.00 = Rp. 1,326,000.00
112.1514 Analisa I. 2 @Rp. 23,300.00 = Rp. 2,613,127.62
Jumlah = Rp. 5,868,717.97
Dibulatkan = Rp. 5,868,717.00

SUPL. V. RB.1 1 M3 BETON BERTULANG RINGBALOK RB.1 (RB, 15x20 CM)

7.5000 Analisa F. 8 @Rp. 210,500.00 = Rp. 1,578,750.00


1.0000 Analisa G. 41 @Rp. 1,326,000.00 = Rp. 1,326,000.00
112.1514 Analisa I. 2 @Rp. 23,300.00 = Rp. 2,613,127.62
Jumlah = Rp. 5,517,877.62
Dibulatkan = Rp. 5,517,877.00
SUPL. V. RB.2 1 M3 BETON BERTULANG RINGBALOK RB.2 (RB, 15x15 CM)

13.3333 Analisa F. 8 @Rp. 210,500.00 = Rp. 2,806,659.65


1.0000 Analisa G. 41 @Rp. 1,326,000.00 = Rp. 1,326,000.00
148.5138 Analisa I. 2 @Rp. 23,300.00 = Rp. 3,460,371.54
Jumlah = Rp. 7,593,031.19
Dibulatkan = Rp. 7,593,031.00

SUPL. V. Plt. 1 M3 BETON BERTULANG PLAT LANTAI T. 10 CM

10.0000 Analisa F. 8 @Rp. 210,500.00 = Rp. 2,105,000.00


1.0000 Analisa G. 41 @Rp. 1,326,000.00 = Rp. 1,326,000.00
8.2068 Analisa I. 2 @Rp. 23,300.00 = Rp. 191,219.56
Jumlah = Rp. 3,622,219.56
Dibulatkan = Rp. 3,622,219.00
ANL. G.14 1 M3 PEREKAT 1 PC : 3 PS

11.7500 Zak PC @ 50 Kg @Rp. 65,000.00 = Rp. 763,750.00


0.9500 1 M3 Pasir Pasang @Rp. 150,000.00 = Rp. 142,500.00
Jumlah = Rp. 906,250.00
Dibulatkan = Rp. 906,250.00

ANL. G. 72.a 1 M2 PASANGAN LANTAI KERAMIK 30 x 30 WARNA

1.0000 Ktk Keramik Warna @Rp. #NAME? = Rp. #NAME?


0.0020 Zak Semen Putih @Rp. 240,000.00 = Rp. 480.00
0.1420 Zak PC @ 50 Kg @Rp. 65,000.00 = Rp. 9,230.00
0.0330 1 M3 Pasir Pasang @Rp. 150,000.00 = Rp. 4,950.00
0.2500 Tukang @Rp. 120,000.00 = Rp. 30,000.00
0.0250 Kepala Tukang @Rp. 150,000.00 = Rp. 3,750.00
0.5000 Pekerja Terampil @Rp. 80,000.00 = Rp. 40,000.00
0.0250 Mandor @Rp. 100,000.00 = Rp. 2,500.00
Jumlah = Rp. #NAME?
Dibulatkan = Rp. #NAME?

ANL. G. 72.b 1 M2 PASANGAN LANTAI KERAMIK 30 x 30 PUTIH POLOS

1.0000 Ktk Keramik Polos @Rp. #NAME? = Rp. #NAME?


0.0020 Zak Semen Putih @Rp. 240,000.00 = Rp. 480.00
0.1420 Zak PC @ 50 Kg @Rp. 65,000.00 = Rp. 9,230.00
0.0330 1 M3 Pasir Pasang @Rp. 150,000.00 = Rp. 4,950.00
0.2500 Tukang @Rp. 120,000.00 = Rp. 30,000.00
0.0250 Kepala Tukang @Rp. 150,000.00 = Rp. 3,750.00
0.5000 Pekerja Terampil @Rp. 80,000.00 = Rp. 40,000.00
0.0250 Mandor @Rp. 100,000.00 = Rp. 2,500.00
Jumlah = Rp. #NAME?
Dibulatkan = Rp. #NAME?

ANL. G. 72c 1 M2 PASANGAN LANTAI KERAMIK 20 x 20 WARNA

1.0000 Ktk Keramik Warna @Rp. #NAME? = Rp. #NAME?


0.0020 Zak Semen Putih @Rp. 240,000.00 = Rp. 480.00
0.1420 Zak PC @ 50 Kg @Rp. 65,000.00 = Rp. 9,230.00
0.0330 1 M3 Pasir Pasang @Rp. 150,000.00 = Rp. 4,950.00
0.2500 Tukang @Rp. 120,000.00 = Rp. 30,000.00
0.0250 Kepala Tukang @Rp. 150,000.00 = Rp. 3,750.00
0.5000 Pekerja Terampil @Rp. 80,000.00 = Rp. 40,000.00
0.0250 Mandor @Rp. 100,000.00 = Rp. 2,500.00
Jumlah = Rp. #NAME?
Dibulatkan = Rp. #NAME?

SUPL. IV.a 1 M2 PASANGAN DINDING KERAMIK 20 x 25 WARNA

1.0000 Ktk. Keramik Warna @Rp. #NAME? = Rp. #NAME?


0.0020 Zak Semen Putih @Rp. 240,000.00 = Rp. 480.00
0.0100 Perekat G.14 @Rp. 906,250.00 = Rp. 9,062.50
0.2500 Tukang @Rp. 120,000.00 = Rp. 30,000.00
0.0250 Kepala Tukang @Rp. 150,000.00 = Rp. 3,750.00
0.5000 Pekerja Terampil @Rp. 80,000.00 = Rp. 40,000.00
0.0250 Mandor @Rp. 100,000.00 = Rp. 2,500.00
Jumlah = Rp. #NAME?
Dibulatkan = Rp. #NAME?

SUPL. IV.b 1 M2 PASANGAN DINDING KERAMIK 20 x 25 POLOS

1.0000 Ktk. Keramik Polos @Rp. #NAME? = Rp. #NAME?


0.0020 Zak Semen Putih @Rp. 240,000.00 = Rp. 480.00
0.0100 Perekat G.14 @Rp. 906,250.00 = Rp. 9,062.50
0.2500 Tukang @Rp. 120,000.00 = Rp. 30,000.00
0.0250 Kepala Tukang @Rp. 150,000.00 = Rp. 3,750.00
0.5000 Pekerja Terampil @Rp. 80,000.00 = Rp. 40,000.00
0.0250 Mandor @Rp. 100,000.00 = Rp. 2,500.00
Jumlah = Rp. #NAME?
Dibulatkan = Rp. #NAME?

ANL. G. 68.a 1 M' PASANGAN PLINT KERAMIK 10 x 30 WARNA

0.1000 Ktk Keramik 30 x 30 @Rp. #NAME? = Rp. #NAME?


0.0020 Zak Semen Putih @Rp. 240,000.00 = Rp. 480.00
0.0100 Perekat G.14 @Rp. 906,250.00 = Rp. 9,062.50
0.1000 Tukang @Rp. 120,000.00 = Rp. 12,000.00
0.0100 Kepala Tukang @Rp. 150,000.00 = Rp. 1,500.00
0.3000 Pekerja Terampil @Rp. 80,000.00 = Rp. 24,000.00
0.0150 Mandor @Rp. 100,000.00 = Rp. 1,500.00
Jumlah = Rp. #NAME?
Dibulatkan = Rp. #NAME?

ANL. G. 68.b 1 M1 PASANGAN PLINT KERAMIK 10 x 30 PUTIH POLOS

0.1000 Ktk Keramik 30 x 30 @Rp. #NAME? = Rp. #NAME?


0.0020 Zak Semen Putih @Rp. 240,000.00 = Rp. 480.00
0.0100 Perekat G.14 @Rp. 906,250.00 = Rp. 9,062.50
0.1000 Tukang @Rp. 120,000.00 = Rp. 12,000.00
0.0100 Kepala Tukang @Rp. 150,000.00 = Rp. 1,500.00
0.3000 Pekerja Terampil @Rp. 80,000.00 = Rp. 24,000.00
0.0150 Mandor @Rp. 100,000.00 = Rp. 1,500.00
Jumlah = Rp. #NAME?
Dibulatkan = Rp. #NAME?

ANL. G. 67 1 M2 COR LANTAI BETON CAMP, 1 PC : 3 PS : 6 KR

0.0700 Kerikil @Rp. 200,000.00 = Rp. 14,000.00


0.3638 Zak PC @ 50 Kg @Rp. 65,000.00 = Rp. 23,647.00
0.0440 1 M3 Pasir Pasang @Rp. 150,000.00 = Rp. 6,600.00
0.1350 Tukang @Rp. 120,000.00 = Rp. 16,200.00
0.0135 Kepala Tukang @Rp. 150,000.00 = Rp. 2,025.00
0.7200 Pekerja @Rp. 80,000.00 = Rp. 57,600.00
0.0360 Mandor @Rp. 100,000.00 = Rp. 3,600.00
Jumlah = Rp. 123,672.00
Dibulatkan = Rp. 123,672.00

Untuk tbl 5 cm 5/7 x @Rp. 123,672.00 Jumlah = Rp. 88,337.14


Dibulatkan = Rp. 88,337.00
ANL. G.55.b 1 M2 PAVING BLOCK (Type BATA & GERGAJI)

45.0000 bh Paving Block @Rp. 2,000.00 =Rp. 90,000.00


0.1000 m3 Pasir Timbun @Rp. 120,000.00 =Rp. 12,000.00
0.0500 Tukang @Rp. 120,000.00 =Rp. 6,000.00
0.2000 Pekerja @Rp. 80,000.00 =Rp. 16,000.00
Jumlah =Rp. 124,000.00
Dibulatkan =Rp. 124,000.00

ANL. G.55.c 1 M2 PAVING BLOCK (Type TIGA BERLIAN & SEGI ENAM)

38.0000 bh Paving block @Rp. 2,000.00 =Rp. 76,000.00


0.1000 m3 Pasir Timbun @Rp. 120,000.00 =Rp. 12,000.00
0.0500 Tukang @Rp. 120,000.00 =Rp. 6,000.00
0.2000 Pekerja @Rp. 80,000.00 =Rp. 16,000.00
Jumlah =Rp. 110,000.00
Dibulatkan =Rp. 110,000.00

ANL. G.55.d 1 M2 PAVING BLOCK (Type BATA Mutu K.175)

45.0000 bh Paving block @Rp. 2,000.00 =Rp. 90,000.00


0.1000 m3 Pasir Timbun @Rp. 120,000.00 =Rp. 12,000.00
0.0500 Tukang @Rp. 120,000.00 =Rp. 6,000.00
0.2000 Pekerja @Rp. 80,000.00 =Rp. 16,000.00
Jumlah =Rp. 124,000.00
Dibulatkan =Rp. 124,000.00

ANL. F. 1a 1 M2 PLAFOND POLYWOOD 4 MM :

0.8000 Tukang @Rp. 120,000.00 = Rp. 96,000.00


0.0800 Kepala Tukang @Rp. 150,000.00 = Rp. 12,000.00
0.2800 Pekerja @Rp. 80,000.00 = Rp. 22,400.00
0.0140 Mandor @Rp. 100,000.00 = Rp. 1,400.00
Jumlah = Rp. 131,800.00

0.5000 Upah Kerja @Rp. 131,800.00 = Rp. 65,900.00


0.2200 Kg. Paku @Rp. 15,000.00 = Rp. 3,300.00
0.0124 M3 Kayu Kls III @Rp. 3,000,000.00 = Rp. 37,200.00
0.3472 Lbr Polywood @Rp. #NAME? = Rp. #NAME?
Jumlah = Rp. #NAME?
Dibulatkan = Rp. #NAME?

ANL. F. 1b 1 M2 PLAFOND ASBES :

0.8000 Tukang @Rp. 120,000.00 = Rp. 96,000.00


0.0800 Kepala Tukang @Rp. 150,000.00 = Rp. 12,000.00
0.2800 Pekerja Terampil @Rp. 80,000.00 = Rp. 22,400.00
0.0140 Mandor @Rp. 100,000.00 = Rp. 1,400.00
Jumlah = Rp. 131,800.00

0.5000 Upah Kerja @Rp. 131,800.00 = Rp. 65,900.00


0.2200 Kg. Paku @Rp. 15,000.00 = Rp. 3,300.00
0.0124 M3 Kayu Kls III @Rp. 3,000,000.00 = Rp. 37,200.00
1.0000 Lbr Asbes @Rp. #NAME? = Rp. #NAME?
0.5000 Btg Lat Asbes @Rp. #NAME? = Rp. #NAME?
Jumlah = Rp. #NAME?
Dibulatkan = Rp. #NAME?

ANL. F. 21 1 M2 MENGERJAKAN LYSPLANK

0.8000 Tukang @Rp. 120,000.00 = Rp. 96,000.00


0.0800 Kepala Tukang @Rp. 150,000.00 = Rp. 12,000.00
0.2800 Pekerja Terampil @Rp. 80,000.00 = Rp. 22,400.00
0.0140 Mandor @Rp. 100,000.00 = Rp. 1,400.00
0.1000 Kg. Paku @Rp. 15,000.00 = Rp. 1,500.00
0.0220 M3 Kayu Kls III @Rp. 3,000,000.00 = Rp. 66,000.00
Jumlah = Rp. 199,300.00
Dibulatkan = Rp. 199,300.00

ANL. F. 22 1 M3 MENGERJAKAN RANGKA ATAS

3/4 24.0000 Tukang @Rp. 120,000.00 = Rp. 2,160,000.00


3/4 2.4000 Kepala Tukang @Rp. 150,000.00 = Rp. 270,000.00
3/4 8.0000 Pekerja Terampil @Rp. 80,000.00 = Rp. 480,000.00
3/4 0.4000 Mandor @Rp. 100,000.00 = Rp. 30,000.00
1.1000 M3 Kayu Kls III @Rp. 3,000,000.00 = Rp. 3,300,000.00
Jumlah = Rp. 6,240,000.00
Dibulatkan = Rp. 6,240,000.00

ANL. F. 27 1 M3 MENGERJAKAN KOZEN

2/3 ) 36.0000 Tukang @Rp. 120,000.00 = Rp. 2,880,000.00


2/3 ) 3.6000 Kepala Tukang @Rp. 150,000.00 = Rp. 360,000.00
12.0000 Pekerja Terampil @Rp. 80,000.00 = Rp. 960,000.00
0.6000 Mandor @Rp. 100,000.00 = Rp. 60,000.00
1.1000 M3 Kayu Kls II @Rp. #NAME? = Rp. #NAME?
Jumlah = Rp. #NAME?
Dibulatkan = Rp. #NAME?

ANL. F. 33 1 M2 MENGERJAKAN PINTU / JENDELA PANIL 3.5 Cm

7.5000 Tukang @Rp. 120,000.00 = Rp. 900,000.00


0.7500 Kepala Tukang @Rp. 150,000.00 = Rp. 112,500.00
2.5000 Pekerja Terampil @Rp. 80,000.00 = Rp. 200,000.00
0.1250 Mandor @Rp. 100,000.00 = Rp. 12,500.00
Jumlah = Rp. 1,225,000.00
Dibulatkan = Rp. 1,225,000.00

0.5000 Upah @Rp. 1,225,000.00 = Rp. 612,500.00


0.0350 M3 Kayu Kls II @Rp. #NAME? = Rp. #NAME?
Jumlah = Rp. #NAME?
Dibulatkan = Rp. #NAME?

ANL. F. 33a 1 M2 MENGERJAKAN PINTU / JENDELA PANIL 3.5 Cm LAPIS ALUMINIUM

7.5000 Tukang @Rp. 120,000.00 = Rp. 900,000.00


0.7500 Kepala Tukang @Rp. 150,000.00 = Rp. 112,500.00
2.5000 Pekerja Terampil @Rp. 80,000.00 = Rp. 200,000.00
0.1250 Mandor @Rp. 100,000.00 = Rp. 12,500.00
Jumlah = Rp. 1,225,000.00

0.5000 Upah @Rp. 1,225,000.00 = Rp. 612,500.00


0.0440 M3 Kayu Kls II @Rp. #NAME? = Rp. #NAME?
0.6944 Lbr. Aluminium @Rp. #NAME? = Rp. #NAME?
0.1000 Kg. Paku @Rp. 15,000.00 = Rp. 1,500.00
Jumlah = Rp. #NAME?
Dibulatkan = Rp. #NAME?

ANL. F. 36a 1 M2 MENGERJAKAN PINTU / JENDELA KACA

6.0000 Tukang @Rp. 120,000.00 = Rp. 720,000.00


0.6000 Kepala Tukang @Rp. 150,000.00 = Rp. 90,000.00
2.0000 Pekerja Terampil @Rp. 80,000.00 = Rp. 160,000.00
0.1000 Mandor @Rp. 100,000.00 = Rp. 10,000.00
Jumlah = Rp. 980,000.00

0.5000 Upah @Rp. 980,000.00 = Rp. 490,000.00


11.1100 Kk Kaca Polos @Rp. 12,000.00 = Rp. 133,320.00
0.0150 M3 Kayu Kls II @Rp. #NAME? = Rp. #NAME?
0.0500 Kg. Paku @Rp. 15,000.00 = Rp. 750.00
Jumlah = Rp. #NAME?
Dibulatkan = Rp. #NAME?

ANL. F. 36b 1 M2 MENGERJAKAN KACA MATI

6.0000 Tukang @Rp. 120,000.00 = Rp. 720,000.00


0.6000 Kepala Tukang @Rp. 150,000.00 = Rp. 90,000.00
2.0000 Pekerja Terampil @Rp. 80,000.00 = Rp. 160,000.00
0.1000 Mandor @Rp. 100,000.00 = Rp. 10,000.00
Jumlah = Rp. 980,000.00

0.2500 Upah @Rp. 980,000.00 = Rp. 245,000.00


11.0000 Kk Kaca Polos @Rp. 12,000.00 = Rp. 132,000.00
Jumlah = Rp. 377,000.00
Dibulatkan = Rp. 377,000.00

ANL. F. 37 1 M2 MENGERJAKAN DINDING PAPAN :

0.8000 Tukang @Rp. 120,000.00 =Rp. 96,000.00


0.0800 Kepala tukang @Rp. 150,000.00 =Rp. 12,000.00
0.2800 Pekerja Terampil @Rp. 80,000.00 =Rp. 22,400.00
0.0140 Mandor @Rp. 100,000.00 =Rp. 1,400.00
0.0220 M3 Kayu Kls II @Rp. #NAME? =Rp. #NAME?
0.2000 kg Paku @Rp. 15,000.00 =Rp. 3,000.00
Jumlah =Rp. #NAME?
Dibulatkan =Rp. #NAME?

ANL. H. 8 1 M2 MENGERJAKAN ATAP SENG

0.2000 Tukang @Rp. 120,000.00 = Rp. 24,000.00


0.0200 Kepala Tukang @Rp. 150,000.00 = Rp. 3,000.00
0.1000 Pekerja @Rp. 80,000.00 = Rp. 8,000.00
0.0500 Mandor @Rp. 100,000.00 = Rp. 5,000.00
4.0000 Bh Paku Seng @Rp. 350.00 = Rp. 1,400.00
0.8856 Atap Seng 7" @Rp. #NAME? = Rp. #NAME?
Jumlah = Rp. #NAME?
Dibulatkan = Rp. #NAME?

ANL. H. 8a 1 M2 MENGERJAKAN ATAP MEGADEK MD.35 Type 760


0.2000 Tukang @Rp. 120,000.00 = Rp. 24,000.00
0.0200 Kepala Tukang @Rp. 150,000.00 = Rp. 3,000.00
0.1000 Pekerja Terampil @Rp. 80,000.00 = Rp. 8,000.00
0.0500 Mandor @Rp. 100,000.00 = Rp. 5,000.00
4.0000 Bh Ulir @Rp. 4.50 = Rp. 18.00
1.1000 Atap Megadek @Rp. #NAME? = Rp. #NAME?
Jumlah = Rp. #NAME?
Dibulatkan = Rp. #NAME?

ANL. H. 10 10 M' MENGERJAKAN RABUNG SENG

0.2500 Tukang @Rp. 120,000.00 = Rp. 30,000.00


0.0250 Kepala Tukang @Rp. 150,000.00 = Rp. 3,750.00
0.2500 Pekerja @Rp. 80,000.00 = Rp. 20,000.00
21.0000 Bh Paku Seng @Rp. 350.00 = Rp. 7,350.00
6.0000 Rabung Seng @Rp. #NAME? = Rp. #NAME?
Jumlah = Rp. #NAME?
Dibulatkan = Rp. #NAME?

Untuk 1 M' = x 1/10 = Rp. #NAME? = Rp. #NAME?


Dibulatkan = Rp. #NAME?

ANL. H. 10a 10 M' MENGERJAKAN RABUNG MEGADEK

0.2500 Tukang @Rp. 120,000.00 = Rp. 30,000.00


0.0250 Kepala Tukang @Rp. 150,000.00 = Rp. 3,750.00
0.2500 Pekerja Terampil @Rp. 80,000.00 = Rp. 20,000.00
21.0000 Bh Paku Ulir @Rp. 4.50 = Rp. 94.50
10.0000 M' Rabung Megadek @Rp. #NAME? = Rp. #NAME?
Jumlah = Rp. #NAME?
Dibulatkan = Rp. #NAME?

Untuk 1 M' = x 1/10 = Rp. #NAME? = Rp. #NAME?


Dibulatkan = Rp. #NAME?
ANL. K. 23 + K.10 M2 MENGECAT 3 KALI ( 1 KALI CAT DASAR + 2 KALI CAT WARNA )

0.7500 Tukang @Rp. 120,000.00 = Rp. 90,000.00


0.0750 Kepala Tukang @Rp. 150,000.00 = Rp. 11,250.00
0.5000 Pekerja Terampil @Rp. 80,000.00 = Rp. 40,000.00
0.0250 Mandor @Rp. 100,000.00 = Rp. 2,500.00
1.4850 Ltr. Thinner @Rp. 24,000.00 = Rp. 35,640.00
4.2500 Kg. Cat Warna @Rp. 55,000.00 = Rp. 233,750.00
Jumlah = Rp. 413,140.00
Dibulatkan = Rp. 413,140.00

Untuk 1 M2 = 1/10 x Rp. 413,140.00 = Rp. 41,314.00


Dibulatkan = Rp. 41,314.00

ANL. K. 23 10 M2 MENGECAT 3 KALI DENGAN CAT TEMBOK

0.7500 Tukang @Rp. 120,000.00 = Rp. 90,000.00


0.0750 Kepala Tukang @Rp. 150,000.00 = Rp. 11,250.00
0.5000 Pekerja Terampil @Rp. 80,000.00 = Rp. 40,000.00
0.0250 Mandor @Rp. 100,000.00 = Rp. 2,500.00
4.2500 Kg. Cat Tembok @Rp. 24,000.00 = Rp. 102,000.00
Jumlah = Rp. 245,750.00
Dibulatkan = Rp. 245,750.00

Untuk 1 M2 = 1/10 x Rp. 245,750.00 = Rp. 24,575.00


Dibulatkan = Rp. 24,575.00

Panyabungan, Januari 2014

Dihitung / Disiapkan :

PERENCANA
0

AHMAD JAUHARI NASUTION


0
DAFTAR UPAH KERJA / HARI

NAMA KEGIATAN : PEMBANGUNAN MESJID JAMI' LINTAS TIMUR KOTASIANTAR

LOKASI : PANYABUNGAN

HARGA SATUAN
KODE JUMLAH HARGA
NO. KEAHLIAN UPAH / JAM KETERANGAN
ANALISA JAM / HARI ( Rp )
( Rp. )
1 2 3 4 5 6 7

1 L 061 Mandor 7 14,285.71 100,000.00 7 Jam / Hari


2 L 073 Kepala Tukang 7 21,428.57 150,000.00 7 Jam / Hari
3 L 079 Tukang 7 17,142.86 120,000.00 7 Jam / Hari
4 L 106 Pekerja Terampil 7 11,428.57 80,000.00 7 Jam / Hari

Panyabungan, Januari 2014

Dihitung / Disiapkan :

PERENCANA
0

AHMAD JAUHARI NASUTION


0
DAFTAR HARGA BAHAN BANGUNAN

NAMA KEGIATAN : PEMBANGUNAN MESJID JAMI' LINTAS TIMUR KOTASIANTAR

LOKASI : PANYABUNGAN

NO. JENIS MATERIAL SPESIFIKASI SATUAN HARGA DI LOKASI

a b c d f

1 PASIR & BATU


PASIR Pasir Pasang M3 Rp. 150,000.00
Pasir Timbun M3 Rp. 120,000.00
Tanah Timbun M3 Rp. 50,000.00
Sirtu M3 Rp. 150,000.00

BATU Batu Kerikil M3 Rp. 200,000.00


Batu Kerikil Sungai Royalti M3 Rp. 200,000.00
Split / Kacang / Jagung M3 Rp. 250,000.00
Batu Kali Bulat M3 Rp. 180,000.00
Batu Koral / Mangga M3 Rp. 140,000.00
Batu Koral ( 2 - 3 Cm ) M3 Rp. 170,000.00

BATU CETAKAN Batu Bata ( 4,5X9X18 ) Bh Rp. 600.00


Paving Blok Lokal
- Type Gergaji (45/M2) Bh Rp. 2,000.00
- Type Bata (45/M2) Bh Rp. 2,000.00
- Type Tiga Berlian (38/M2) Bh Rp. 2,000.00
- Type Segi Enam (38/M2) Bh Rp. 2,000.00
Paving Blok Mutu K. 175 Bh Rp. 4,500.00

BETON CETAK Batu Kerawang 20 x 20 CM Bh Rp. 7,000.00


Batu Kerawang 13 x 20 CM Bh Rp. 5,000.00

2 SEMEN & KAPUR


Semen PC. @ 50 Kg Zak Rp. 65,000.00
Semen Putih Kg Rp. 6,000.00
Kapur Aduk ( 20 Kg ) Kg Rp. 6,000.00

3 BESI BETON & PROFIL


BESI BETON Besi Beton Kiloan Kg Rp. 10,500.00

5 PIPA

PIPA PVC Type AW PVC Type AW Uk. 1/2" Btg Rp. 30,000.00
PVC Type AW Uk. 3/4" Btg Rp. 45,000.00
PVC Type AW Uk. 1" Btg Rp. 60,000.00
PVC Type AW Uk. 3" Btg Rp. 220,000.00
PVC Type AW Uk. 4" Btg Rp. 380,000.00

6 PAKU & PISHER Paku Biasa Kg Rp. 15,000.00


Paku Seng (100 Bh/Ktk) Ktk Rp. 35,000.00
Paku Asbes Gelombang (Paku Ulir) Kg Rp. 450.00
Paku Beton Ktk Rp. 22,000.00
a b c d f

8 KAWAT Beton Kg Rp. 25,000.00

9 BAHAN ATAP & TALANG

GYPSUM Gypsum Jaya Board 9 MM Lbr Rp. #NAME?


Gypsum Magnesium Board 6 MM Lbr Rp. #NAME?
Big Flat Board 6 MM Lbr Rp. #NAME?
Big Flat Board 5 MM Lbr Rp. #NAME?
MOU Lem Counpond Kg Rp. #NAME?
Roping Fiber Ktk Rp. #NAME?
Skrup 1,5" ktk Rp. #NAME?
Textiltip A Glg Rp. #NAME?
Textiltip B Glg Rp. #NAME?
Paku Gypsum Kg Rp. #NAME?
Kain Kasa Glg Rp. #NAME?
List Piala Besar (P. 3 M) Btg Rp. #NAME?
List Piala Kecil (P. 3 M) Btg Rp. #NAME?
List Daun Sirih (P. 3 M) Btg Rp. #NAME?
List Matahari (P. 3 M) Btg Rp. #NAME?
List Singapura (P. 3 M) Btg Rp. #NAME?
List Kangkung (P. 3 M) Btg Rp. #NAME?
List 20 x 20 CM (P. 3 M) Btg Rp. #NAME?
List 15 x 15 CM (P. 3 M) Btg Rp. #NAME?
List 10 x 12 CM (P. 3 M) Btg Rp. #NAME?
List 10 x 10 CM (P. 3 M) Btg Rp. #NAME?
List 7 x 7 CM (P. 3 M) Btg Rp. #NAME?
List 5 x 5 CM (P. 3 M) Btg Rp. #NAME?
List 2 x 4 CM Ukir (P. 3 M) Btg Rp. #NAME?
List 2 x 4 CM Polos (P. 3 M) Btg Rp. #NAME?
List Kali Kali Polos (P. 3 M) Btg Rp. #NAME?
List Kali Kali Ukir (P. 3 M) Btg Rp. #NAME?
Central Panel Besar Bh Rp. #NAME?
Central Panel Sedang Bh Rp. #NAME?
Central Panel Kecil Bh Rp. #NAME?
Central Bunga Besar Bh Rp. #NAME?
Central Panel Lonjong Bh Rp. #NAME?
Casting 20 Kg/Zak Zak Rp. #NAME?
Gypsum & Rangka Furing Tkt. 1, Acc M2 Rp. #NAME?
Gypsum & Rangka Furing Tkt. 2, Acc M2 Rp. #NAME?
Gypsum & Rangka Kayu Tkt. 1, Acc M2 Rp. #NAME?
Gypsum & Rangka Kayu Tkt. 2, Acc M2 Rp. #NAME?

11 KAYU / BROTI / PAPAN


KAYU KLAS Kuda Kuda Baja Ringan M2 Rp. #NAME?
Klas II M3 Rp. #NAME?
Klas III (Sembarang Keras) M3 Rp. 3,000,000.00
Kayu Bulat Max. Ø 10 CM, Pj. 4 M Btg Rp. 12,500.00
Bambu Max. Ø 10 CM, Pj. 4 M Btg Rp. 7,500.00

12 KERAMIK Keramik Polos M2 Rp. #NAME?


Keramik Warna M2 Rp. #NAME?
a b c d f
Bon - Bon Keramik M1 Rp. #NAME?

13 BAHAN SANITAIR
BAK CUCI Bak Cuci Stainlis 1 lubang Bh Rp. #NAME?
Bak Cuci Stainlis 2 lubang Bh Rp. #NAME?

BAK MANDI Uk. 70 x 200 Bak mandi Porselin Bh Rp. #NAME?


Bak mandi Fiber Bh Rp. #NAME?

WASTAFEL Wastafel Metal Lokal Bh Rp. #NAME?


Wastafel Stainles Steel Bh Rp. #NAME?

CLOSED DUDUK
Closed duduk Warna Import Komplit Set Rp. 2,500,000.00

CLOSED JONGKOK Closed Jongkok Keramik Bh Rp. 150,000.00

KRAN & AKSESORIES Kran Air Biasa Bh Rp. 20,000.00


Kran Air Bebek Bh Rp. 75,000.00
Kran Air Wastafel Bh Rp. 75,000.00
Floor Drain Bh Rp. 20,000.00
Dop Bak Air Bh Rp. 20,000.00
Tempat Sabun Bh Rp. 20,000.00

14 BAHAN PENGGANTUNG
KUNCI Kunci Tanam Union Besar Bh Rp. 250,000.00
Kunci Tanam Union Kecil Bh Rp. 150,000.00

GRENDEL Grendel Besar Ukr. 5" Psng Rp. 30,000.00


Grendel Kecil Ukr. 4" Psng Rp. 20,000.00
Grendel Kecil Ukr. 3" Psng Rp. 12,000.00

ENGSEL Engsel Ukr. 5" Psng Rp. 60,000.00


Engsel Ukr. 4" Psng Rp. 30,000.00
Engsel Ukr. 3" Psng Rp. 20,000.00
Engsel Lipat Psng Rp. 20,000.00

HAK ANGIN Hak Angin Lipat Psng Rp. 20,000.00


Hak Angin Cantol Biasa Psng Rp. 20,000.00

15 CAT Kilat Kg Rp. 55,000.00


Perak Kg Rp. 55,000.00
Tembok Kg Rp. 24,000.00
Pernis Klng Rp. 35,000.00
Anti Rembes Kg Rp. 55,000.00
Menie Kg Rp. 24,000.00
Thinner Ltr Rp. 24,000.00

16 KACA & FRAME NAKO Kaca Polos Tebal = 5 mm Kaki Rp. 12,000.00
Kaca Rayben Tebal = 5 mm Kaki Rp. 13,000.00
Glass Block Uk. 20 x 20 CM Bh Rp. 25,000.00
Frame Jendela Nako Daun Rp. 12,000.00
a b c d f

Panyabungan, Januari 2014

Dihitung / Disiapkan :

PERENCANA
0

AHMAD JAUHARI NASUTION


0
DAFTAR HARGA BAHAN BANGUNAN
#NAME? ### #NAME?

NAMA KEGIATAN : PEMBANGUNAN MESJID JAMI' LINTAS TIMUR KOTASIANTAR


#NAME?

LOKASI : PANYABUNGAN

#NAME? ### #NAME?

FAKTOR BIAYA ANGKUT & BONGKAR MUAT BIAYA


HARGA PASAR / PAJAK WAKTU / JUMLAH BIAYA
DASAR / PPn ((10/110)xPn) RESTRIBUSI INFLASI 7% KEUNTUNGAN JARAK DARI QUARRY KELOKASI BERAT BONGKAR TOTAL
NO. JENIS MATERIAL SPESIFIKASI SAT. ANGKUT
TANGKAHAN (PERDA) JENIS
10% ( KM ) MUAT
TRIP TRIP
(Rp.) (Rp.) (Rp.) (Rp.) (Rp.) AB AP T/S TH ( JAM ) ( KG ) (Rp.) (Rp.) (Rp.)
1 2 3 4 5 8 9 10 11 12 13 14 15 16 17 18 19 20 21

1 PASIR & BATU


PASIR Pasir Pasang M3 75,000.00 - - - - 7.00 - - - 1.28 5.47 50,987.00 #NAME? #NAME?
Pasir Timbun M3 60,000.00 - - - - 7.00 - - - 1.28 5.47 50,987.00 #NAME? #NAME?
Tanah Timbun M3 40,000.00 - - - - 7.00 - - - 1.28 5.47 50,987.00 #NAME? #NAME?
Sirtu M3 75,000.00 - - - - 7.00 - - - 1.28 5.47 50,987.00 #NAME? #NAME?
- - - -
BATU Batu Kerikil M3 110,000.00 - - - - 7.00 - - - 1.28 5.47 50,987.00 #NAME? #NAME?
Batu Kerikil Sungai Royalti M3 82,500.00 - - - - 7.00 - - - 1.28 5.47 50,987.00 #NAME? #NAME?
Split / Kacang / Jagung M3 140,000.00 - - - - 7.00 - - - 1.28 5.47 50,987.00 #NAME? #NAME?
Batu Kali Bulat M3 80,000.00 - - - - 7.00 - - - 1.28 5.47 50,987.00 #NAME? #NAME?
Batu Koral / Mangga M3 60,000.00 - - - - 7.00 - - - 1.28 5.47 50,987.00 #NAME? #NAME?
Batu Koral ( 2 - 3 Cm ) M 3
90,000.00 - - - - 7.00 - - - 1.28 5.47 50,987.00 #NAME? #NAME?
Batu Pecah ( 1 - 2 Cm ) M 3
350,000.00 - - - - 7.00 - - - 1.28 5.47 50,987.00 #NAME? #NAME?
Batu Pecah ( 2 - 3 Cm ) M 3
350,000.00 - - - - 7.00 - - - 1.28 5.47 50,987.00 #NAME? #NAME?
Batu Pecah ( 3 - 5 Cm ) M 3
325,000.00 - - - - 7.00 - - - 1.28 5.47 50,987.00 #NAME? #NAME?
Batu Pecah ( 5 - 7 Cm ) M 3
200,000.00 - - - - 7.00 - - - 1.28 5.47 50,987.00 #NAME? #NAME?
Batu Belah ( 10 - 15 Cm ) M 3
126,000.00 - - - - 7.00 - - - 1.28 5.47 50,987.00 #NAME? #NAME?
- - - -
BATU CETAKAN Batu Bata ( 4,5X9X18 ) Bh 500.00 - - - - 7.00 - - - 1.28 5.47 1.20 34.00 #NAME? #NAME?
Batu Bata ( 5X12X20 ) Bh 500.00 - - - - 7.00 - - - 1.28 5.47 1.95 55.24 #NAME? #NAME?
Paving Blok Lokal - - - -
- Type Gergaji (45/M2) Bh 1,725.00 - - - - 7.00 - - - 1.28 5.47 2.20 62.33 #NAME? #NAME?
- Type Bata (45/M2) Bh 1,725.00 - - - - 7.00 - - - 1.28 5.47 2.20 62.33 #NAME? #NAME?
- Type Tiga Berlian (38/M2) Bh 1,725.00 - - - - 7.00 - - - 1.28 5.47 2.20 62.33 #NAME? #NAME?
- Type Segi Enam (38/M2) Bh 1,725.00 - - - - 7.00 - - - 1.28 5.47 2.20 62.33 #NAME? #NAME?
Paving Blok Mutu K. 175 Bh 3,450.00 - - - - 7.00 - - - 1.28 5.47 3.00 84.99 #NAME? #NAME?
- - - -
BETON CETAK Batu Kerawang 20 x 20 CM Bh 6,000.00 - - - - 7.00 - - - 1.28 5.47 2.00 56.66 #NAME? #NAME?
Batu Kerawang 13 x 20 CM Bh 6,000.00 - - - - 7.00 - - - 1.28 5.47 2.00 56.66 #NAME? #NAME?
Riol Uk 1/2 x 15 CM Bh 11,700.00 - - - - 7.00 - - - 1.28 5.47 18.40 521.27 #NAME? #NAME?
Riol Uk 1/2 x 20 CM Bh 14,300.00 - - - - 7.00 - - - 1.28 5.47 23.50 665.76 #NAME? #NAME?
Riol Uk. 10 CM Bh 14,000.00 - - - - 7.00 - - - 1.28 5.47 26.50 750.75 #NAME? #NAME?
Riol Uk. 15 CM Bh 20,200.00 - - - - 7.00 - - - 1.28 5.47 36.70 1,039.71 #NAME? #NAME?
Riol Uk. 20 CM Bh 25,000.00 - - - - 7.00 - - - 1.28 5.47 46.90 1,328.68 #NAME? #NAME?
Riol Uk. 25 CM Bh 39,500.00 - - - - 7.00 - - - 1.28 5.47 78.90 2,235.24 #NAME? #NAME?
Riol Uk. 30 CM Bh 45,000.00 - - - - 7.00 - - - 1.28 5.47 119.10 3,374.10 #NAME? #NAME?
Riol Uk. 40 CM Bh 84,500.00 - - - - 7.00 - - - 1.28 5.47 187.80 5,320.37 #NAME? #NAME?
Riol Uk. 50 CM Bh 110,500.00 - - - - 7.00 - - - 1.28 5.47 228.60 6,476.24 #NAME? #NAME?
Riol Uk. 60 CM Bh 130,000.00 - - - - 7.00 - - - 1.28 5.47 319.10 9,040.10 #NAME? #NAME?
Riol Uk. 70 CM Bh 156,000.00 - - - - 7.00 - - - 1.28 5.47 424.50 12,026.09 #NAME? #NAME?
Riol Uk. 80 CM Bh 182,000.00 - - - - 7.00 - - - 1.28 5.47 544.90 15,437.02 #NAME? #NAME?
- - - -
2 SEMEN & KAPUR Semen PC. @ 40 Kg Zak 60,000.00 - - - - 7.00 - - - 1.28 5.47 40.00 1,133.20 #NAME? #NAME?
Semen PC. @ 50 Kg Zak 65,000.00 - - - - 7.00 - - - 1.28 5.47 50.00 1,416.50 #NAME? #NAME?
Semen Putih Kg 5,000.00 - - - - 7.00 - - - 1.28 5.47 1.00 28.33 #NAME? #NAME?
1 2 3 4 5 8 9 10 11 12 13 14 15 16 17 18 19 20 21
Kapur Aduk ( 20 Kg ) Kg 4,200.00 - - - - 7.00 - - - 1.28 5.47 1.00 28.33 #NAME? #NAME?
- - - -
- - - -
3 BESI BETON & PROFIL - - - -
BESI BETON Besi Beton Kiloan Kg 10,500.00 - - - - 7.00 - - - 1.28 5.47 1.00 28.33 #NAME? #NAME?
- - - -
BESI PROFIL Besi Profil Kiloan Kg 16,900.00 - - - - 7.00 - - - 1.28 5.47 1.00 28.33 #NAME? #NAME?
- - - -
4 PLAT - - - -
BESI PLAT Besi Plat Strip Kg 14,500.00 - - - - 7.00 - - - 1.28 5.47 0.50 14.17 #NAME? #NAME?
Besi Plat 4' x 8' x t = 1,2 mm Lbr 377,000.00 - - - - 7.00 - - - 1.28 5.47 23.25 658.81 #NAME? #NAME?
Besi Plat 4' x 8' x t = 2 mm Lbr 780,000.00 - - - - 7.00 - - - 1.28 5.47 38.76 1,098.01 #NAME? #NAME?
Besi Plat 4' x 8' x t = 3 mm Lbr 1,105,000.00 - - - - 7.00 - - - 1.28 5.47 58.14 1,647.02 #NAME? #NAME?
Besi Plat 4' x 8' x t = 4 mm Lbr 1,560,000.00 - - - - 7.00 - - - 1.28 5.47 77.52 2,196.02 #NAME? #NAME?
Besi Plat 4' x 8' x t = 6 mm Lbr 2,210,000.00 - - - - 7.00 - - - 1.28 5.47 116.27 3,294.04 #NAME? #NAME?
Besi Plat 4' x 8' x t = 8 mm Lbr 2,860,000.00 - - - - 7.00 - - - 1.28 5.47 155.03 4,392.05 #NAME? #NAME?
Besi Plat 4' x 8' x t = 10 mm Lbr 3,900,000.00 - - - - 7.00 - - - 1.28 5.47 193.79 5,490.06 #NAME? #NAME?
- - - -
ALUMINIUM PLAT Almu Plat 4' x 8' x t = 0,3 mm Lbr 92,000.00 - - - - 7.00 - - - 1.28 5.47 1.65 46.74 #NAME? #NAME?
Almu Plat 4' x 8' x t = 0,4 mm Lbr 138,000.00 - - - - 7.00 - - - 1.28 5.47 2.20 62.33 #NAME? #NAME?
Almu Plat 4' x 8' x t = 0,5 mm Lbr 184,000.00 - - - - 7.00 - - - 1.28 5.47 2.80 79.32 #NAME? #NAME?
Almu Plat 4' x 8' x t = 0,6 mm Lbr 230,000.00 - - - - 7.00 - - - 1.28 5.47 3.30 93.49 #NAME? #NAME?
Almu Plat 4' x 8' x t = 0,7 mm Lbr 253,000.00 - - - - 7.00 - - - 1.28 5.47 3.80 107.65 #NAME? #NAME?
Almu Plat 4' x 8' x t = 0,8 mm Lbr 299,000.00 - - - - 7.00 - - - 1.28 5.47 4.40 124.65 #NAME? #NAME?
Almu Plat 4' x 8' x t = 0,9 mm Lbr 345,000.00 - - - - 7.00 - - - 1.28 5.47 5.00 141.65 #NAME? #NAME?
Almu Plat 4' x 8' x t = 1,0 mm Lbr 632,500.00 - - - - 7.00 - - - 1.28 5.47 5.60 158.65 #NAME? #NAME?
- - - -
SENG PLAT Seng Plat 3' x 6' x t = 0,2 mm Lbr 54,000.00 - - - - 7.00 - - - 1.28 5.47 2.80 79.32 #NAME? #NAME?
Seng Plat 3' x 6' x t = 0,25 mm Lbr 64,800.00 - - - - 7.00 - - - 1.28 5.47 3.50 99.16 #NAME? #NAME?
Seng Plat 3' x 6' x t = 0,3 mm Lbr 72,000.00 - - - - 7.00 - - - 1.28 5.47 5.57 157.80 #NAME? #NAME?
Seng Plat 3' x 6' x t = 0,35 mm Lbr 90,000.00 - - - - 7.00 - - - 1.28 5.47 6.50 184.15 #NAME? #NAME?
Seng Plat 3' x 6' x t = 0,4 mm Lbr 134,400.00 - - - - 7.00 - - - 1.28 5.47 7.43 210.49 #NAME? #NAME?
- - - -
5 PIPA - - - -
PIPA PVC Type D PVC Type D Uk. 1/2" Btg 50,025.00 - - - - 7.00 - - - 1.28 5.47 0.30 8.50 #NAME? #NAME?
PVC Type D Uk. 3/4" Btg 63,000.00 - - - - 7.00 - - - 1.28 5.47 0.50 14.17 #NAME? #NAME?
PVC Type D Uk. 1" Btg 72,000.00 - - - - 7.00 - - - 1.28 5.47 0.70 19.83 #NAME? #NAME?
PVC Type D Uk. 1 1/4" Btg 106,200.00 - - - - 7.00 - - - 1.28 5.47 0.90 25.50 #NAME? #NAME?
PVC Type D Uk. 1 1/2" Btg 124,200.00 - - - - 7.00 - - - 1.28 5.47 1.10 31.16 #NAME? #NAME?
PVC Type D Uk. 2" Btg 135,000.00 - - - - 7.00 - - - 1.28 5.47 1.50 42.50 #NAME? #NAME?
PVC Type D Uk. 2 1/2" Btg 162,000.00 - - - - 7.00 - - - 1.28 5.47 2.10 59.49 #NAME? #NAME?
PVC Type D Uk. 3" Btg 180,000.00 - - - - 7.00 - - - 1.28 5.47 3.00 84.99 #NAME? #NAME?
PVC Type D Uk. 4" Btg 315,000.00 - - - - 7.00 - - - 1.28 5.47 5.40 152.98 #NAME? #NAME?
- - - -
PIPA PVC Type AW PVC Type AW Uk. 1/2" Btg 30,000.00 - - - - 7.00 - - - 1.28 5.47 0.39 11.05 #NAME? #NAME?
PVC Type AW Uk. 3/4" Btg 40,000.00 - - - - 7.00 - - - 1.28 5.47 0.65 18.41 #NAME? #NAME?
PVC Type AW Uk. 1" Btg 55,000.00 - - - - 7.00 - - - 1.28 5.47 0.91 25.78 #NAME? #NAME?
PVC Type AW Uk. 1 1/4" Btg 80,000.00 - - - - 7.00 - - - 1.28 5.47 1.17 33.15 #NAME? #NAME?
- - - -
- - - -
PVC Type AW Uk. 1 1/2" Btg 95,000.00 - - - - 7.00 - - - 1.28 5.47 1.43 40.51 #NAME? #NAME?
PVC Type AW Uk. 2" Btg 120,000.00 - - - - 7.00 - - - 1.28 5.47 1.95 55.24 #NAME? #NAME?
PVC Type AW Uk. 2 1/2" Btg 175,000.00 - - - - 7.00 - - - 1.28 5.47 2.73 77.34 #NAME? #NAME?
PVC Type AW Uk. 3" Btg 200,000.00 - - - - 7.00 - - - 1.28 5.47 3.90 110.49 #NAME? #NAME?
PVC Type AW Uk. 4" Btg 375,000.00 - - - - 7.00 - - - 1.28 5.47 7.02 198.88 #NAME? #NAME?
PVC Type AW Uk. 5" Btg 424,584.00 - - - - 7.00 - - - 1.28 5.47 10.53 298.31 #NAME? #NAME?
PVC Type AW Uk. 6" Btg 685,843.00 - - - - 7.00 - - - 1.28 5.47 15.80 447.61 #NAME? #NAME?
PVC Type AW Uk. 8" Btg 833,419.00 - - - - 7.00 - - - 1.28 5.47 23.70 671.42 #NAME? #NAME?
PVC Type AW Uk. 10" Btg 920,995.00 - - - - 7.00 - - - 1.28 5.47 35.55 1,007.13 #NAME? #NAME?
PVC Type AW Uk. 12" Btg 1,038,571.00 - - - - 7.00 - - - 1.28 5.47 53.33 1,510.84 #NAME? #NAME?
- - - -
PIPA GALVANIS MEDIUM Galvanis Uk. 1/2" Btg 141,739.00 - - - - 7.00 - - - 1.28 5.47 6.06 171.68 #NAME? #NAME?
Galvanis Uk. 3/4" Btg 184,500.00 - - - - 7.00 - - - 1.28 5.47 7.76 219.84 #NAME? #NAME?
1 2 3 4 5 8 9 10 11 12 13 14 15 16 17 18 19 20 21
Galvanis Uk. 1 " Btg 283,476.00 - - - - 7.00 - - - 1.28 5.47 10.15 287.55 #NAME? #NAME?
Galvanis Uk. 1 1/4" T. 2.4 Btg 360,552.00 - - - - 7.00 - - - 1.28 5.47 15.88 449.88 #NAME? #NAME?
Galvanis Uk. 1 1/2" T. 2.4 Btg 408,894.00 - - - - 7.00 - - - 1.28 5.47 22.00 623.26 #NAME? #NAME?
Galvanis Uk. 2" T. 2.4 Btg 573,492.00 - - - - 7.00 - - - 1.28 5.47 27.78 787.01 #NAME? #NAME?
Galvanis Uk. 2 1/2" T. 2.4 Btg 735,486.00 - - - - 7.00 - - - 1.28 5.47 32.78 928.66 #NAME? #NAME?
Galvanis Uk. 3" T. 2.4 Btg 961,488.00 - - - - 7.00 - - - 1.28 5.47 42.13 1,193.54 #NAME? #NAME?
Galvanis Uk. 4" T. 2.4 Btg 1,384,746.00 - - - - 7.00 - - - 1.28 5.47 54.71 1,549.93 #NAME? #NAME?
- - - -
PIPA BESI HITAM Besi Hitam Uk. 1/2" T. 2 MM Btg 102,000.00 - - - - 7.00 - - - 1.28 5.47 5.33 151.00 #NAME? #NAME?
Besi Hitam Uk. 3/4" T. 2 MM Btg 120,000.00 - - - - 7.00 - - - 1.28 5.47 7.07 200.29 #NAME? #NAME?
Besi Hitam Uk. 1" T. 2 MM Btg 162,000.00 - - - - 7.00 - - - 1.28 5.47 11.54 326.93 #NAME? #NAME?
Besi Hitam Uk. 1 1/4" T. 2 MM Btg 180,000.00 - - - - 7.00 - - - 1.28 5.47 13.32 377.36 #NAME? #NAME?
Besi Hitam Uk. 1 1/2" T. 2 MM Btg 192,000.00 - - - - 7.00 - - - 1.28 5.47 14.13 400.30 #NAME? #NAME?
Besi Hitam Uk. 2" T. 2 MM Btg 216,000.00 - - - - 7.00 - - - 1.28 5.47 16.72 473.68 #NAME? #NAME?
Besi Hitam Uk. 2 1/2" T. 2 MM Btg 288,000.00 - - - - 7.00 - - - 1.28 5.47 21.42 606.83 #NAME? #NAME?
Besi Hitam Uk. 3" T. 2 MM Btg 360,000.00 - - - - 7.00 - - - 1.28 5.47 28.58 809.67 #NAME? #NAME?
Besi Hitam Uk. 4" T. 2 MM Btg 480,000.00 - - - - 7.00 - - - 1.28 5.47 35.74 1,012.51 #NAME? #NAME?
- - - -
6 PAKU & PISHER Paku Biasa Kg 18,000.00 - - - - 7.00 - - - 1.28 5.47 1.00 28.33 #NAME? #NAME?
Paku Seng (100 Bh/Ktk) Ktk 30,000.00 - - - - 7.00 - - - 1.28 5.47 1.50 42.50 #NAME? #NAME?
Paku Asbes Gelombang (Paku Ulir) Kg 400.00 - - - - 7.00 - - - 1.28 5.47 0.02 0.42 #NAME? #NAME?
Paku Beton Ktk 20,000.00 - - - - 7.00 - - - 1.28 5.47 0.50 14.17 #NAME? #NAME?
Paku Lintah Ktk 25,300.00 - - - - 7.00 - - - 1.28 5.47 0.02 0.42 #NAME? #NAME?
Pisher (S 8) Bh 1,725.00 - - - - 7.00 - - - 1.28 5.47 0.02 0.42 #NAME? #NAME?
Pisher (S 10) Bh 2,013.00 - - - - 7.00 - - - 1.28 5.47 0.02 0.42 #NAME? #NAME?
Pisher (S 12) Bh 2,300.00 - - - - 7.00 - - - 1.28 5.47 0.02 0.42 #NAME? #NAME?
- - - -
7 ANGKER & BAUT Anker Baut Ø 20 MM Bh 3,600.00 - - - - 7.00 - - - 1.28 5.47 0.03 0.85 #NAME? #NAME?
Baut Ø 0,5" - 0,5" Bh 1,100.00 - - - - 7.00 - - - 1.28 5.47 0.03 0.85 #NAME? #NAME?
Baut Ø 0,5" - 1" Bh 1,430.00 - - - - 7.00 - - - 1.28 5.47 0.03 0.85 #NAME? #NAME?
Baut Ø 0,5" - 1,5" Bh 1,850.00 - - - - 7.00 - - - 1.28 5.47 0.04 1.13 #NAME? #NAME?
Baut Ø 0,5" - 2" Bh 1,980.00 - - - - 7.00 - - - 1.28 5.47 0.05 1.42 #NAME? #NAME?
Baut Ø 0,5" - 2,5" Bh 2,230.00 - - - - 7.00 - - - 1.28 5.47 0.07 1.98 #NAME? #NAME?
Baut Ø 0,5" - 3" Bh 2,530.00 - - - - 7.00 - - - 1.28 5.47 0.08 2.27 #NAME? #NAME?
Baut Ø 0,5" - 3,5" Bh 2,650.00 - - - - 7.00 - - - 1.28 5.47 0.09 2.55 #NAME? #NAME?
Baut Ø 0,5" - 4" Bh 2,860.00 - - - - 7.00 - - - 1.28 5.47 0.10 2.83 #NAME? #NAME?
Baut Ø 0,5" - 4,5" Bh 3,080.00 - - - - 7.00 - - - 1.28 5.47 0.11 3.12 #NAME? #NAME?
Baut Ø 0,5" - 5" Bh 3,300.00 - - - - 7.00 - - - 1.28 5.47 0.12 3.40 #NAME? #NAME?
Baut Ø 0,5" - 5,5" Bh 3,630.00 - - - - 7.00 - - - 1.28 5.47 0.13 3.68 #NAME? #NAME?
Baut Ø 0,5" - 6" Bh 3,740.00 - - - - 7.00 - - - 1.28 5.47 0.15 4.25 #NAME? #NAME?
Baut Ø 0,5" - 7" Bh 4,400.00 - - - - 7.00 - - - 1.28 5.47 0.17 4.82 #NAME? #NAME?
Baut Ø 0,5" - 8" Bh 4,950.00 - - - - 7.00 - - - 1.28 5.47 0.19 5.38 #NAME? #NAME?
Baut Ø 0,5" - 9" Bh 5,280.00 - - - - 7.00 - - - 1.28 5.47 0.21 5.95 #NAME? #NAME?
Baut Ø 0,5" - 10" Bh 6,380.00 - - - - 7.00 - - - 1.28 5.47 0.23 6.52 #NAME? #NAME?
Baut Ø 0,5" - 11" Bh 6,600.00 - - - - 7.00 - - - 1.28 5.47 0.25 7.08 #NAME? #NAME?
- - - -
8 KAWAT Beton Kg 20,000.00 - - - - 7.00 - - - 1.28 5.47 1.00 28.33 #NAME? #NAME?
Bronjong Roll 585,000.00 - - - - 7.00 - - - 1.28 5.47 1.00 28.33 #NAME? #NAME?
Duri Lokal (70 M) Glg 95,000.00 - - - - 7.00 - - - 1.28 5.47 9.00 254.97 #NAME? #NAME?
Ikat Lokal (6 Kg/Rol ) M1 170,000.00 - - - - 7.00 - - - 1.28 5.47 0.60 17.00 #NAME? #NAME?
- - - -
- - - -
Nyamuk Lokal M2 19,500.00 - - - - 7.00 - - - 1.28 5.47 0.50 14.17 #NAME? #NAME?
Harmonika M 2
25,000.00 - - - - 7.00 - - - 1.28 5.47 0.50 14.17 #NAME? #NAME?
- - - -
9 BAHAN ATAP & TALANG - - - -
BAHAN ATAP Atap Seng Gelombang ( 7 KK ) Kk 45,000.00 - - - - 7.00 - - - 1.28 5.47 2.20 62.33 #NAME? #NAME?
Atap Asbes Gelombang ( 7 KK ) Kk 54,000.00 - - - - 7.00 - - - 1.28 5.47 6.60 186.98 #NAME? #NAME?
Atap Metal Mega Deck MD.30 T.760 M 2
68,000.00 - - - - 7.00 - - - 1.28 5.47 2.86 81.02 #NAME? #NAME?
- - - -
BAHAN RABUNG Rabung Seng Lbr 18,000.00 - - - - 7.00 - - - 1.28 5.47 1.00 28.33 #NAME? #NAME?
Rabung Asbes Gelombang Lbr 21,600.00 - - - - 7.00 - - - 1.28 5.47 2.00 56.66 #NAME? #NAME?
Rabung Metal Mega Deck Lbr 42,000.00 - - - - 7.00 - - - 1.28 5.47 1.00 28.33 #NAME? #NAME?
1 2 3 4 5 8 9 10 11 12 13 14 15 16 17 18 19 20 21
Markis Seng Lbr 18,000.00 - - - - 7.00 - - - 1.28 5.47 1.00 28.33 #NAME? #NAME?
- - - -
TALANG PLASTIK Talang Plastik P. 4 M Lbr 65,000.00 - - - - 7.00 - - - 1.28 5.47 3.00 84.99 #NAME? #NAME?
Sambungan Talang Bh 6,000.00 - - - - 7.00 - - - 1.28 5.47 0.10 2.83 #NAME? #NAME?
Elbo Talang Bh 12,000.00 - - - - 7.00 - - - 1.28 5.47 0.20 5.67 #NAME? #NAME?
Gantungan Talang Bh 4,000.00 - - - - 7.00 - - - 1.28 5.47 0.20 5.67 #NAME? #NAME?
Cocor Bebek Bh 14,400.00 - - - - 7.00 - - - 1.28 5.47 0.40 11.33 #NAME? #NAME?
- - - -
10 BAHAN PLAFOND - - - -
ASBES Asbes Cement Lokal 1 x 1 M Lbr 13,200.00 - - - - 7.00 - - - 1.28 5.47 1.50 42.50 #NAME? #NAME?
Asbes Cement Import 1 x 1 M Lbr 18,000.00 - - - - 7.00 - - - 1.28 5.47 1.60 45.33 #NAME? #NAME?
- - - -
POLYWOOD / TRIPLEX Plywood Tebal = 4 mm Lbr 65,000.00 - - - - 7.00 - - - 1.28 5.47 8.80 249.30 #NAME? #NAME?
Plywood Tebal = 6 mm Lbr 95,000.00 - - - - 7.00 - - - 1.28 5.47 14.20 402.29 #NAME? #NAME?
Plywood Tebal = 9 mm Lbr 130,000.00 - - - - 7.00 - - - 1.28 5.47 16.80 475.94 #NAME? #NAME?
Plywood Formika Lbr 64,400.00 - - - - 7.00 - - - 1.28 5.47 5.50 155.82 #NAME? #NAME?
Plywood Jati Lbr 85,000.00 - - - - 7.00 - - - 1.28 5.47 5.60 158.65 #NAME? #NAME?
- - - -
GYPSUM Gypsum Jaya Board 9 MM Lbr 70,000.00 - - - - 7.00 - - - 1.28 5.47 8.50 240.81 #NAME? #NAME?
Gypsum Magnesium Board 6 MM Lbr 65,000.00 - - - - 7.00 - - - 1.28 5.47 5.70 161.48 #NAME? #NAME?
Big Flat Board 6 MM Lbr 75,000.00 - - - - 7.00 - - - 1.28 5.47 5.80 164.31 #NAME? #NAME?
Big Flat Board 5 MM Lbr 55,000.00 - - - - 7.00 - - - 1.28 5.47 5.00 141.65 #NAME? #NAME?
MOU Lem Counpond Kg 5,000.00 - - - - 7.00 - - - 1.28 5.47 1.00 28.33 #NAME? #NAME?
Roping Fiber Ktk 300,000.00 - - - - 7.00 - - - 1.28 5.47 1.00 28.33 #NAME? #NAME?
Skrup 1,5" ktk 9,000.00 - - - - 7.00 - - - 1.28 5.47 0.02 0.57 #NAME? #NAME?
Textiltip A Glg 15,000.00 - - - - 7.00 - - - 1.28 5.47 0.01 0.28 #NAME? #NAME?
Textiltip B Glg 12,000.00 - - - - 7.00 - - - 1.28 5.47 0.01 0.28 #NAME? #NAME?
Paku Gypsum Kg 20,000.00 - - - - 7.00 - - - 1.28 5.47 1.00 28.33 #NAME? #NAME?
Kain Kasa Glg 15,000.00 - - - - 7.00 - - - 1.28 5.47 0.20 5.67 #NAME? #NAME?
List Piala Besar (P. 3 M) Btg 30,000.00 - - - - 7.00 - - - 1.28 5.47 3.00 84.99 #NAME? #NAME?
List Piala Kecil (P. 3 M) Btg 20,000.00 - - - - 7.00 - - - 1.28 5.47 2.80 79.32 #NAME? #NAME?
List Daun Sirih (P. 3 M) Btg 20,000.00 - - - - 7.00 - - - 1.28 5.47 2.80 79.32 #NAME? #NAME?
List Matahari (P. 3 M) Btg 18,000.00 - - - - 7.00 - - - 1.28 5.47 2.80 79.32 #NAME? #NAME?
List Singapura (P. 3 M) Btg 15,000.00 - - - - 7.00 - - - 1.28 5.47 2.80 79.32 #NAME? #NAME?
List Kangkung (P. 3 M) Btg 15,000.00 - - - - 7.00 - - - 1.28 5.47 2.80 79.32 #NAME? #NAME?
List 20 x 20 CM (P. 3 M) Btg 18,000.00 - - - - 7.00 - - - 1.28 5.47 4.00 113.32 #NAME? #NAME?
List 15 x 15 CM (P. 3 M) Btg 15,000.00 - - - - 7.00 - - - 1.28 5.47 3.75 106.24 #NAME? #NAME?
List 10 x 12 CM (P. 3 M) Btg 15,000.00 - - - - 7.00 - - - 1.28 5.47 3.50 99.16 #NAME? #NAME?
List 10 x 10 CM (P. 3 M) Btg 15,000.00 - - - - 7.00 - - - 1.28 5.47 3.25 92.07 #NAME? #NAME?
List 7 x 7 CM (P. 3 M) Btg 8,000.00 - - - - 7.00 - - - 1.28 5.47 3.00 84.99 #NAME? #NAME?
List 5 x 5 CM (P. 3 M) Btg 8,000.00 - - - - 7.00 - - - 1.28 5.47 2.75 77.91 #NAME? #NAME?
List 2 x 4 CM Ukir (P. 3 M) Btg 7,000.00 - - - - 7.00 - - - 1.28 5.47 2.50 70.83 #NAME? #NAME?
List 2 x 4 CM Polos (P. 3 M) Btg 7,000.00 - - - - 7.00 - - - 1.28 5.47 2.50 70.83 #NAME? #NAME?
List Kali Kali Polos (P. 3 M) Btg 18,000.00 - - - - 7.00 - - - 1.28 5.47 2.50 70.83 #NAME? #NAME?
List Kali Kali Ukir (P. 3 M) Btg 18,000.00 - - - - 7.00 - - - 1.28 5.47 2.50 70.83 #NAME? #NAME?
Central Panel Besar Bh 300,000.00 - - - - 7.00 - - - 1.28 5.47 3.00 84.99 #NAME? #NAME?
Central Panel Sedang Bh 100,000.00 - - - - 7.00 - - - 1.28 5.47 2.50 70.83 #NAME? #NAME?
Central Panel Kecil Bh 25,000.00 - - - - 7.00 - - - 1.28 5.47 2.00 56.66 #NAME? #NAME?
Central Bunga Besar Bh 100,000.00 - - - - 7.00 - - - 1.28 5.47 3.00 84.99 #NAME? #NAME?
Central Panel Lonjong Bh 100,000.00 - - - - 7.00 - - - 1.28 5.47 3.00 84.99 #NAME? #NAME?
Casting 20 Kg/Zak Zak 65,000.00 - - - - 7.00 - - - 1.28 5.47 3.00 84.99 #NAME? #NAME?
Gypsum & Rangka Furing Tkt. 1, Acc M 2
170,000.00 - - - - 7.00 - - - 1.28 5.47 4.00 113.32 #NAME? #NAME?
- - - -
- - - -
Gypsum & Rangka Furing Tkt. 2, Acc M2 200,000.00 - - - - 7.00 - - - 1.28 5.47 4.50 127.49 #NAME? #NAME?
Gypsum & Rangka Kayu Tkt. 1, Acc M 2
150,000.00 - - - - 7.00 - - - 1.28 5.47 8.00 226.64 #NAME? #NAME?
Gypsum & Rangka Kayu Tkt. 2, Acc M 2
200,000.00 - - - - 7.00 - - - 1.28 5.47 9.00 254.97 #NAME? #NAME?
- - - -
11 KAYU / BROTI / PAPAN - - - -
KAYU KLAS Kuda Kuda Baja Ringan M2 250,000.00 - - - - 7.00 - - - 1.28 5.47 6.00 169.98 #NAME? #NAME?
Klas II M 3
2,833,600.00 - - - - 7.00 - - - 1.28 5.47 50,987.00 #NAME? #NAME?
Klas III (Sembarang Keras) M 3
2,318,400.00 - - - - 7.00 - - - 1.28 5.47 50,987.00 #NAME? #NAME?
Kayu Bulat Max. Ø 10 CM, Pj. 4 M Btg 12,096.00 - - - - 7.00 - - - 1.28 5.47 10.00 283.30 #NAME? #NAME?
1 2 3 4 5 8 9 10 11 12 13 14 15 16 17 18 19 20 21
Bambu Max. Ø 10 CM, Pj. 4 M Btg 7,280.00 - - - - 7.00 - - - 1.28 5.47 10.00 283.30 #NAME? #NAME?
- - - -
LAT PROFIL Lat Asbes 1 x 3 CM Btg 5,750.00 - - - - 7.00 - - - 1.28 5.47 1.00 28.33 #NAME? #NAME?
Lat Asbes 1 x 4 CM Btg 6,325.00 - - - - 7.00 - - - 1.28 5.47 1.10 31.16 #NAME? #NAME?
- - - -
LIST PROFIL - List Profil 1" P. 4 M Btg 20,700.00 - - - - 7.00 - - - 1.28 5.47 1.40 39.66 #NAME? #NAME?
- List Profil 1 1/4" P. 4 M Btg 27,600.00 - - - - 7.00 - - - 1.28 5.47 1.50 42.50 #NAME? #NAME?
- List Profil 1 1/2" P. 4 M Btg 32,200.00 - - - - 7.00 - - - 1.28 5.47 1.70 48.16 #NAME? #NAME?
- - - -
12 KERAMIK Keramik Polos M2 45,000.00 - - - - 7.00 - - - 1.28 5.47 15.00 424.95 #NAME? #NAME?
Keramik Warna M2 60,000.00 - - - - 7.00 - - - 1.28 5.47 18.00 509.94 #NAME? #NAME?
Bon - Bon Keramik M1 10,000.00 - - - - 7.00 - - - 1.28 5.47 0.15 4.25 #NAME? #NAME?
- - - -
13 BAHAN SANITAIR - - - -
BAK CUCI Bak Cuci Stainlis 1 lubang Bh 282,000.00 - - - - 7.00 - - - 1.28 5.47 3.00 84.99 #NAME? #NAME?
Bak Cuci Stainlis 2 lubang Bh 462,000.00 - - - - 7.00 - - - 1.28 5.47 2.00 56.66 #NAME? #NAME?
- - - -
BAK MANDI Uk. 70 x 200 Bak mandi Porselin Bh 3,300,000.00 - - - - 7.00 - - - 1.28 5.47 15.00 424.95 #NAME? #NAME?
Bak mandi Fiber Bh 1,740,000.00 - - - - 7.00 - - - 1.28 5.47 10.00 283.30 #NAME? #NAME?
- - - -
WASTAFEL Wastafel Metal Lokal Bh 480,000.00 - - - - 7.00 - - - 1.28 5.47 3.00 84.99 #NAME? #NAME?
Wastafel Stainles Steel Bh 360,000.00 - - - - 7.00 - - - 1.28 5.47 2.00 56.66 #NAME? #NAME?
- - - -
CLOSED DUDUK Closed duduk Lokal Bh 368,000.00 - - - - 7.00 - - - 1.28 5.47 20.00 566.60 #NAME? #NAME?
Closed duduk Warna Import Bh 494,500.00 - - - - 7.00 - - - 1.28 5.47 25.00 708.25 #NAME? #NAME?
Closed duduk Warna Import Komplit Set 1,955,000.00 - - - - 7.00 - - - 1.28 5.47 30.00 849.90 #NAME? #NAME?
- - - -
CLOSED JONGKOK Closed Jongkok Keramik Bh 100,000.00 - - - - 7.00 - - - 1.28 5.47 15.00 424.95 #NAME? #NAME?
- - - -
KRAN & AKSESORIES Kran Air Biasa Bh 20,000.00 - - - - 7.00 - - - 1.28 5.47 0.20 5.67 #NAME? #NAME?
Kran Air Bebek Bh 75,000.00 - - - - 7.00 - - - 1.28 5.47 0.30 8.50 #NAME? #NAME?
Kran Air Wastafel Bh 50,000.00 - - - - 7.00 - - - 1.28 5.47 0.20 5.67 #NAME? #NAME?
Floor Drain Bh 15,000.00 - - - - 7.00 - - - 1.28 5.47 0.10 2.83 #NAME? #NAME?
Dop Bak Air Bh 15,000.00 - - - - 7.00 - - - 1.28 5.47 0.10 2.83 #NAME? #NAME?
Tempat Sabun Bh 50,000.00 - - - - 7.00 - - - 1.28 5.47 0.30 8.50 #NAME? #NAME?
- - - -
14 BAHAN PENGGANTUNG - - - -
KUNCI Kunci Tanam Union Besar Bh 60,000.00 - - - - 7.00 - - - 1.28 5.47 1.70 48.16 #NAME? #NAME?
Kunci Tanam Union Kecil Bh 45,000.00 - - - - 7.00 - - - 1.28 5.47 0.55 15.58 #NAME? #NAME?
- - - -
GRENDEL Grendel Besar Ukr. 5" Psng 20,000.00 - - - - 7.00 - - - 1.28 5.47 0.60 17.00 #NAME? #NAME?
Grendel Kecil Ukr. 4" Psng 17,000.00 - - - - 7.00 - - - 1.28 5.47 0.40 11.33 #NAME? #NAME?
Grendel Kecil Ukr. 3" Psng 15,000.00 - - - - 7.00 - - - 1.28 5.47 0.30 8.50 #NAME? #NAME?
- - - -
ENGSEL Engsel Ukr. 5" Psng 50,000.00 - - - - 7.00 - - - 1.28 5.47 0.50 14.17 #NAME? #NAME?
Engsel Ukr. 4" Psng 30,000.00 - - - - 7.00 - - - 1.28 5.47 0.30 8.50 #NAME? #NAME?
Engsel Ukr. 3" Psng 20,000.00 - - - - 7.00 - - - 1.28 5.47 0.20 5.67 #NAME? #NAME?
Engsel Lipat Psng 15,000.00 - - - - 7.00 - - - 1.28 5.47 0.40 11.33 #NAME? #NAME?
- - - -
HAK ANGIN Hak Angin Lipat Psng 15,000.00 - - - - 7.00 - - - 1.28 5.47 0.20 5.67 #NAME? #NAME?
Hak Angin Cantol Biasa Psng 7,500.00 - - - - 7.00 - - - 1.28 5.47 0.10 2.83 #NAME? #NAME?
Hak Angin Cantol Kuningan Psng 40,000.00 - - - - 7.00 - - - 1.28 5.47 0.20 5.67 #NAME? #NAME?
- - - -
15 CAT Kilat Kg 45,000.00 - - - - 7.00 - - - 1.28 5.47 1.00 28.33 #NAME? #NAME?
- - - -
- - - -
Perak Kg 50,000.00 - - - - 7.00 - - - 1.28 5.47 1.00 28.33 #NAME? #NAME?
Tembok Kg 20,000.00 - - - - 7.00 - - - 1.28 5.47 1.00 28.33 #NAME? #NAME?
Pernis Klng 35,000.00 - - - - 7.00 - - - 1.28 5.47 1.00 28.33 #NAME? #NAME?
Serlak Btl 25,000.00 - - - - 7.00 - - - 1.28 5.47 0.80 22.66 #NAME? #NAME?
Anti Rembes Kg 46,000.00 - - - - 7.00 - - - 1.28 5.47 1.00 28.33 #NAME? #NAME?
Menie Kg 20,000.00 - - - - 7.00 - - - 1.28 5.47 1.00 28.33 #NAME? #NAME?
Thinner Ltr 22,000.00 - - - - 7.00 - - - 1.28 5.47 1.00 28.33 #NAME? #NAME?
1 2 3 4 5 8 9 10 11 12 13 14 15 16 17 18 19 20 21
- - - -
16 KACA & FRAME NAKO Kaca Polos Tebal = 5 mm Kaki 9,600.00 - - - - 7.00 - - - 1.28 5.47 0.50 14.17 #NAME? #NAME?
Kaca Rayben Tebal = 5 mm Kaki 10,800.00 - - - - 7.00 - - - 1.28 5.47 0.50 14.17 #NAME? #NAME?
Glass Block Uk. 20 x 20 CM Bh 22,200.00 - - - - 7.00 - - - 1.28 5.47 1.00 28.33 #NAME? #NAME?
Frame Jendela Nako Daun 9,000.00 - - - - 7.00 - - - 1.28 5.47 0.20 5.67 #NAME? #NAME?
- - - -
17 BAHAN ELEKTRIKAL - - - -
LAMPU Lampu Pijar 25 Watt Set 5,000.00 - - - - 7.00 - - - 1.28 5.47 0.20 5.67 #NAME? #NAME?
Lampu Pijar 40 Watt Set 5,000.00 - - - - 7.00 - - - 1.28 5.47 0.80 22.66 #NAME? #NAME?
Lampu TL IB 2 x 20 Watt Set 140,000.00 - - - - 7.00 - - - 1.28 5.47 2.00 56.66 #NAME? #NAME?
Lampu TL IB 2 x 40 Watt Set 175,000.00 - - - - 7.00 - - - 1.28 5.47 2.30 65.16 #NAME? #NAME?
Lampu TL 20 Watt Set 48,000.00 - - - - 7.00 - - - 1.28 5.47 0.80 22.66 #NAME? #NAME?
Lampu TL 40 Watt Set 60,000.00 - - - - 7.00 - - - 1.28 5.47 0.90 25.50 #NAME? #NAME?
Lampu TL Bambu 20 Watt Set 95,000.00 - - - - 7.00 - - - 1.28 5.47 0.50 14.17 #NAME? #NAME?
Lampu TL Bambu 40 Watt Set 105,000.00 - - - - 7.00 - - - 1.28 5.47 0.80 22.66 #NAME? #NAME?
Lampu PLC 18 Watt Set 28,000.00 - - - - 7.00 - - - 1.28 5.47 0.20 5.67 #NAME? #NAME?
Lampu PLC 24 Watt Set 34,240.00 - - - - 7.00 - - - 1.28 5.47 0.20 5.67 #NAME? #NAME?
Lampu PLC 32 Watt Set 40,660.00 - - - - 7.00 - - - 1.28 5.47 0.20 5.67 #NAME? #NAME?
Lampu PLC 60 Watt Set 74,900.00 - - - - 7.00 - - - 1.28 5.47 0.20 5.67 #NAME? #NAME?
Lampu DL PLC 18 Watt Set 78,000.00 - - - - 7.00 - - - 1.28 5.47 0.50 14.17 #NAME? #NAME?
Lampu Taman (Crystal Light) Komplit Set 175,000.00 - - - - 7.00 - - - 1.28 5.47 2.00 56.66 #NAME? #NAME?
Lampu Cembung Plafond Set 75,000.00 - - - - 7.00 - - - 1.28 5.47 1.00 28.33 #NAME? #NAME?
Lampu Gantung Baso Set 600,000.00 - - - - 7.00 - - - 1.28 5.47 5.00 141.65 #NAME? #NAME?
Lampu Gantung Lilin Set 750,000.00 - - - - 7.00 - - - 1.28 5.47 5.00 141.65 #NAME? #NAME?
Lampu Sorot Kotak 500 Watt Set 75,000.00 - - - - 7.00 - - - 1.28 5.47 2.00 56.66 #NAME? #NAME?
Lampu Sorot Kotak 1000 Watt Set 135,000.00 - - - - 7.00 - - - 1.28 5.47 2.00 56.66 #NAME? #NAME?
Lampu Sorot Bulat 80 Watt Set 65,000.00 - - - - 7.00 - - - 1.28 5.47 1.00 28.33 #NAME? #NAME?
Lampu Sudut Dinding 50 Watt Set 300,000.00 - - - - 7.00 - - - 1.28 5.47 1.00 28.33 #NAME? #NAME?
Lampu Dinding 50 Watt Set 750,000.00 - - - - 7.00 - - - 1.28 5.47 1.00 28.33 #NAME? #NAME?
Lampu Pendopo Plastik Set 175,000.00 - - - - 7.00 - - - 1.28 5.47 1.00 28.33 #NAME? #NAME?
Lampu Pendopo Besi Set 275,000.00 - - - - 7.00 - - - 1.28 5.47 1.50 42.50 #NAME? #NAME?
Lampu Sorot 400 W Komplit Set 1,498,000.00 - - - - 7.00 - - - 1.28 5.47 1.50 42.50 #NAME? #NAME?
Instalasi Listrik Bh 150,000.00 - - - - 7.00 - - - 1.28 5.47 - #NAME? #NAME?
- - - -
SAKLAR Saklar Tunggal IB Bh 10,000.00 - - - - 7.00 - - - 1.28 5.47 0.05 1.42 #NAME? #NAME?
Saklar Ganda IB Bh 13,000.00 - - - - 7.00 - - - 1.28 5.47 0.06 1.70 #NAME? #NAME?
Saklar Triple IB Bh 15,000.00 - - - - 7.00 - - - 1.28 5.47 0.09 2.55 #NAME? #NAME?
Saklar Tunggal OB Bh 7,000.00 - - - - 7.00 - - - 1.28 5.47 0.05 1.42 #NAME? #NAME?
Saklar Ganda OB Bh 8,000.00 - - - - 7.00 - - - 1.28 5.47 0.06 1.70 #NAME? #NAME?
- - - -
STOP KONTAK Stop Kontak IB Bh 10,000.00 - - - - 7.00 - - - 1.28 5.47 0.05 1.42 #NAME? #NAME?
Stop Kontak OB Bh 8,000.00 - - - - 7.00 - - - 1.28 5.47 0.06 1.70 #NAME? #NAME?
- - - -
BOX SEKRING Box Sekring 1 Group Bh 28,000.00 - - - - 7.00 - - - 1.28 5.47 0.03 0.85 #NAME? #NAME?
Box Sekring 2 Group Bh 35,000.00 - - - - 7.00 - - - 1.28 5.47 0.05 1.42 #NAME? #NAME?
Box Sekring 3 Group Bh 63,000.00 - - - - 7.00 - - - 1.28 5.47 0.07 1.98 #NAME? #NAME?
- - - -
FUSE BOX MCB Fuse Box MCB 4 Group Bh 25,000.00 - - - - 7.00 - - - 1.28 5.47 0.04 1.13 #NAME? #NAME?
Fuse Box 6 Group Bh 32,000.00 - - - - 7.00 - - - 1.28 5.47 0.06 1.70 #NAME? #NAME?
Fuse Box 8 Group Bh 40,000.00 - - - - 7.00 - - - 1.28 5.47 0.08 2.27 #NAME? #NAME?
- - - -
PANEL & POMPA AIR Panel Kontrol (40x50x20) + Acc Set 1,800,000.00 - - - - 7.00 - - - 1.28 5.47 5.00 141.65 #NAME? #NAME?
Pompa Air Bh 350,000.00 - - - - 7.00 - - - 1.28 5.47 5.00 141.65 #NAME? #NAME?
Exosphan 14" Set 350,000.00 - - - - 7.00 - - - 1.28 5.47 3.00 84.99 #NAME? #NAME?
Kipas Angin Type 56 CM Set 450,000.00 - - - - 7.00 - - - 1.28 5.47 3.50 99.16 #NAME? #NAME?
Bak Air Fiber 2000 Ltr Set 3,575,000.00 - - - - 7.00 - - - 1.28 5.47 3.00 84.99 #NAME? #NAME?
- - - -
- - - -
18 BAHAN PERTAMANAN Angsana / Asona Btg 26,750.00 - - - - 7.00 - - - 1.28 5.47 5.00 141.65 #NAME? #NAME?
Plamboyan Btg 26,750.00 - - - - 7.00 - - - 1.28 5.47 5.00 141.65 #NAME? #NAME?
Dadap Btg 160,500.00 - - - - 7.00 - - - 1.28 5.47 5.00 141.65 #NAME? #NAME?
Kamboja Btg 74,900.00 - - - - 7.00 - - - 1.28 5.47 5.00 141.65 #NAME? #NAME?
Rumput Paitan M2 27,820.00 - - - - 7.00 - - - 1.28 5.47 5.00 141.65 #NAME? #NAME?
1 2 3 4 5 8 9 10 11 12 13 14 15 16 17 18 19 20 21
Teh-Tehan M2 40,660.00 - - - - 7.00 - - - 1.28 5.47 5.00 141.65 #NAME? #NAME?
Cemara Kwanda Btg 42,800.00 - - - - 7.00 - - - 1.28 5.47 5.00 141.65 #NAME? #NAME?
Cemara Kipas Btg 39,590.00 - - - - 7.00 - - - 1.28 5.47 5.00 141.65 #NAME? #NAME?
Cemara Salju Btg 39,590.00 - - - - 7.00 - - - 1.28 5.47 5.00 141.65 #NAME? #NAME?
Palem Raja Btg 37,450.00 - - - - 7.00 - - - 1.28 5.47 5.00 141.65 #NAME? #NAME?
Palem Putri Btg 37,450.00 - - - - 7.00 - - - 1.28 5.47 5.00 141.65 #NAME? #NAME?
Palem Ekor Tupai Btg 37,450.00 - - - - 7.00 - - - 1.28 5.47 5.00 141.65 #NAME? #NAME?
Tanah Hitan M3 85,600.00 - - - - 7.00 - - - 1.28 5.47 50,987.00 #NAME? #NAME?
Pupuk Kompos Krg 32,100.00 - - - - 7.00 - - - 1.28 5.47 5.00 141.65 #NAME? #NAME?
Kanstin Pulau Jalan M1 53,500.00 - - - - 7.00 - - - 1.28 5.47 5.00 141.65 #NAME? #NAME?

KETERANGAN

AB = Aspal Beton
AP = Aspal Penetrasi Panyabungan, Januari 2014
T/S = Telford/Sirtu
TH = Tanah Dihitung / Disiapkan :

KOLOM PERENCANA
0
16 = Wktu Trip = (2xAB)/50 + (2xAP)/40 + (2xT/S)/30 + (2xTH)/20 + 1
17 = Jumlah Trip = 7/waktu/trip (Pembulatan Kebawah)
19 = Biaya Angkut = Rp. 836500/(Jumlah Trip x 3)
20 = Biaya Bongkar Muat = Rp. 0,64 x Upah Pekerja Tidak Terampil
21 = (8 + 9 + 10 + 11 + 19 + 20) AHMAD JAUHARI NASUTION
0
TIME SCHEDULE

KEGIATAN : PENINGKATAN SARANA DAN PRASARANA APARATUR

PAKET PEKERJAAN : LANJUTAN PEMBANGUNAN KANTOR DINAS PU


KAB. MANDAILING NATAL

LOKASI : KOMPLEK PERKANTORAN PAYALOTING, PANYABUNGAN

TAHUN ANGGARAN : 2010

BULAN I BULAN II BULAN III BULAN IV BULAN V BULAN VI BULAN VII BULAN VIII BULAN IX
NO. URAIAN BOBOT MINGGU KE MINGGU KE MINGGU KE MINGGU KE MINGGU KE MINGGU KE MINGGU KE MINGGU KE MINGGU KE KET
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

A. PEKERJAAN PENDAHULUAN
1 Pekerjaan Pembersihan Lokasi 0.224 0.112 0.112 100 %
2 Pekerjaan Bouwplank 0.115 0.115
3 Pekerjaan Bongkar 0.321 0.321
4 Papan Nama Proyek 0.055 0.055
5 Photo Dokumentasi 0.092 0.023 0.023 0.023 0.023
B. GEDUNG BIDANG BINA MARGA
I. PEKERJAAN GALIAN & TANAH
1 Galian Tanah 0.431 0.431
2 Timbunan Tanah Kembali 0.027 0.027
3 Urugan Tanah 0.386 0.386
II. PEKERJAAN PONDASI
1 Urugan Pasir di Bawah Pondasi 0.145 0.145
2 Lantai Kerja 0.066 0.066
3 Pondasi Pas. Batu Kali 1 : 4 5.338 1.868 3.470
4 Pondasi Tapak PT.2 (100x100x30 CM) 2.323 1.162 1.162
5 Stik Kolom Induk K3 (30x30 CM) 0.606 0.606
III. PEKERJAAN STUKTUR BALOK & KOLOM
1 Balok Sloof S.2 (20x25 CM) 3.334 1.833 1.500
2 Balok Sloof S.3 (15x20 CM) 2.024 2.024
3 Kolom Induk K.3 (30x30 CM) 1.261 0.820 0.441
4 Kolom Induk K.4 (20x25 CM) 5.053 3.284 1.769
5 Kolom Induk K.5 (20x20 CM) 0.373 0.373
6 Kolom Praktis KP 1.031 0.516 0.516
7 Balok Gantung B.4 (15x20 CM) 0.571 0.571
8 Balok Tengah B.5 (10x20 CM) 1.865 1.865
9 Balok Konsul (20x30x55 CM) 0.410 0.410
10 Balok Listplank BLSP-B (20x25 CM) 0.244 0.244
11 Balok Listplank Talang BLSPTG (20x30 CM) 5.514 5.514
12 Ring Balok RB.1 (15x20 CM) 1.739 1.739
13 Ring Balok RB.2 (10x15 CM) 0.877 0.877
IV. PEKERJAAN PASANGAN & PLESTERAN
1 Pas. Dinding Bata 1 : 4 5.895 5.011 0.884
2 Plasteran Bata 1 : 4 4.696 3.757 0.939
V. PEKERJAAN LANTAI
1 Urugan Pasir di Bawah Lantai 0.563 0.422 0.141 50 %
2 Lantai Keramik 30 x 30 Putih Polos 6.147 3.073 3.073
3 Lantai Keramik 20 x 20 Warna 0.078 0.078
4 Dinding Keramik 20 x 25 Warna 0.334 0.334
5 Bon bon Keramik 0.039 0.039
6 Lantai Rabat Beton, T. 5 CM 0.553 0.553
VI. PEKERJAAN PINTU DAN JENDELA
1 Kozen Pintu & Jendela
Kozen KPJ-1 0.308 0.308
Kozen KPJ-2 0.308 0.308
Kozen KP-1 0.067 0.067
Kozen KP-2 0.054 0.054
Kozen KJ-1 0.791 0.791
Kozen KV-1 0.040 0.040
2 Pekerjaan Pintu Panel
Pintu KPJ-1 0.517 0.517
Pintu KPJ-2 0.517 0.517
Pintu KP-1 0.172 0.172
Pintu KP-2 0.151 0.151
3 Pekerjaan Jendela Panel Kaca
Jendela KPJ-1 0.477 0.477
Jendela KPJ-2 0.477 0.477
Jendela KP-1 0.032 0.032
Jendela KJ-1 1.716 1.716
Jendela KV-1 0.048 0.048
4 Pekerjaan Kunci & Gantungan
Kunci Tanam (2 slaag) 0.098 0.098
Engsel Pintu (Uk. 4") 0.136 0.136
Grendel Pintu (Uk. 4") 0.033 0.033
Engsel Jendela (Uk. 3") 0.343 0.343 50 %
Grendel Jendela (Uk. 3") 0.257 0.257
Hak Angin Lipat 0.257 0.257
Handle Jendela 0.172 0.172
VII. PEKERJAAN ATAP & PLAFOND
1 Kuda-Kuda & Rangka Atap 5.357 3.214 2.143
2 Angker Baut 0.251 0.251
3 Atap Mega Dek (MD 760, T. 0,30) 9.153 9.153
4 Rabung Mega Dek 0.211 0.211
5 Talang Mega Dek 0.077 0.077
6 Pekerjaan Listplank 0.572 0.572
7 Pekerjaan Plafond Polywood 4 MM 5.076 1.396 3.680
8 Pekerjaan List Profil Keliling 1 1/2" 0.383 0.383
VIII. PEKERJAAN CAT
1 Cat kilat 1.126 0.225 0.901
2 Cat Tembok 3.124 0.625 2.499
IX. PEKERJAAN ELEKTRIKAL
1 Instalasi Penerangan 1.262 0.631 0.631
2 Lampu PLC 32 Watt 0.166 0.166
3 Stop Kontak IB 0.025 0.025
4 Saklar Tunggal IB 0.012 0.012
5 Saklar Ganda IB 0.013 0.013
X. PEKERJAAN PLUMBING
1 Pipa PVC Ø 3" (Limbah Air Kotor) 0.025 0.025
2 Pipa PVC Ø 3" (Limbah Tinja) 0.025 0.025
3 Pipa PVC Ø 2" (Limbah Air Hujan) 0.245 0.245
4 Pipa PVC Ø 1 1/5" (Limbah Washtafel) 0.025 0.025
5 Pipa PVC Ø 3/4" (Jaringan Air Bersih) 0.013 0.013
6 Kloset Jongkok 0.027 0.027
7 Tempat Sabun 0.014 0.014
8 Dob Bak Air 0.004 0.004
9 Floor Drain 0.004 0.004
10 Kran Air 0.005 0.005
11 Washtafel 0.098 0.098
12 Kran Washtafel 0.014 0.014
C. GEDUNG BIDANG PENGAIRAN LANTAI - I
I. PEKERJAAN LANTAI
1 Lantai Keramik 30 x 30 Putih Polos 2.318 2.318
2 Lantai Keramik 20 x 20 Warna 0.156 0.156
3 Dinding Keramik 20 x 25 Warna 0.667 0.667
4 Bon bon Keramik 0.028 0.028
II. PEKERJAAN PLAFOND
1 Pekerjaan Plafond Polywood 4 MM 2.105 2.105
2 Pekerjaan List Profil Keliling 1 1/2" 0.171 0.171
III. PEKERJAAN CAT
1 Cat kilat 0.624 0.078 0.546
2 Cat Tembok 1.569 0.196 1.373
IV. PEKERJAAN PLUMBING
1 Pipa PVC Ø 1 1/5" (Limbah Washtafel) 0.051 0.051
2 Pipa PVC Ø 3/4" (Jaringan Air Bersih) 0.026 0.026
3 Washtafel 0.196 0.196
4 Kran Washtafel 0.027 0.027
V. PEKERJAAN STUKTUR TANGGA
1 Galian Tanah 0.019 0.019
2 Timbunan Tanah Kembali 0.001 0.001
3 Beton Bertulang
Pondasi Tangga (30x90x140 CM) 0.516 0.516
Dinding Pondasi Tangga (15x150x140 CM) 0.434 0.434
Counterfort Pondasi Tangga T. 10 CM 0.095 0.095
Plat Tangga (T. 12 CM) 3.037 3.037
Balok Bordes B.3 (20x25 CM) 0.199 0.199
4 Beton Pengisi Anak Tangga
Beton Pengisi Anak Tangga 0.180 0.180
5 Lantai Keramik 30 x 30 Putih Polos 0.476 0.476
6 Bon bon Keramik 0.100 0.100
D. PEKERJAAN PEMELIHARAAN 0%

JUMLAH TOTAL 100.000


TARGET RENCANA
RENCANA 2.431 3.636 5.329 8.089 12.155 18.195 18.190 12.206 8.621 5.420 3.674 2.053
RENCANA KOMULATIF 2.431 6.067 11.396 19.485 31.640 49.834 68.025 80.231 88.852 94.272 97.947 100.00
REALISASI MINGGU INI
REALISASI S/D MINGGU INI
DEVIASI

Panyabungan, 22 Juni 2010

Disetujui Oleh : Dibuat Oleh :


CV. MULIA CV. MULIA

EPENDI NASUTION ZULKIFLI


Direktur Staf Teknik
PERHITUNGAN PEMBESIAN

PONDASI TAPAK PT-1 (100X100X30 CM)

Diameter
No Jenis Panjang (cm) Jumlah Total Panjang (cm) 0.6 0.8 1 1.2 1.4 1.6 1.9 2.2 2.5 Total Berat (kg)

1 Tul. Tapak 100x100x30

a= 102.00
b= 32.00
c= 94.00
d= 24.00
252.00 12 3,024.00 3,024.00

a= 28.00
b= 91.00
119.00 8 952.00 952.00

TOTAL PANJANG (CM) - - - - - 3,976.00 - - -


BERAT BAJA TULANGAN (KG/CM) 0.002219 0.003946 0.006170 0.008880 0.012100 0.015780 0.022260 0.029840 0.038530
BERAT TOTAL (KG) - - - - - 62.74 - - - 62.74
VOLUME BETON 1 M' 0.30
BERAT BESI 1 M3 BETON (KG) JUMLAH (BH) 3.33 209.14
BEKISTING (M2) 4.00 2.00

PONDASI TAPAK PT-2 (80X80X25 CM)

Diameter
No Jenis Panjang (cm) Jumlah Total Panjang (cm) 0.6 0.8 1 1.2 1.4 1.6 1.9 2.2 2.5 Total Berat (kg)

1 Tul. Tapak 80x80x25

a= 81.00
b= 26.00
c= 75.00
d= 20.00
202.00 10 2,020.00 2,020.00

a= 26.00
b= 70.50
96.50 6 579.00 579.00

TOTAL PANJANG (CM) - - - 2,599.00 - - - - -


BERAT BAJA TULANGAN (KG/CM) 0.002219 0.003946 0.006170 0.008880 0.012100 0.015780 0.022260 0.029840 0.038530
BERAT TOTAL (KG) - - - 23.08 - - - - - 23.08
VOLUME BETON 1 M' 0.16
BERAT BESI 1 M3 BETON (KG) JUMLAH (BH) 6.25 144.24
BEKISTING (M2) 25.00 12.50
KOLOM K1 30/30

Diameter
No Jenis Panjang (cm) Jumlah Total Panjang (cm) 0.6 0.8 1 1.2 1.4 1.6 1.9 2.2 2.5 Total Berat (kg)

1 KOLOM K1 30/30 - 470


a= 29.00
b= 24.00
c= 24.00
d= 29.00
106.00 24 2,544.00 2,544.00

a= 534.00 8 4,272.00 4,272.00

TOTAL PANJANG (CM) - - 2,544.00 - - 4,272.00 - - -


BERAT BAJA TULANGAN (KG/CM) 0.002219 0.003946 0.006170 0.008880 0.012100 0.015780 0.022260 0.029840 0.038530
BERAT TOTAL (KG) - - 15.70 - - 67.41 - - - 83.11
VOLUME BETON 1 M' 0.42
BERAT BESI 1 M3 BETON (KG) PANJANG (M') 2.36 196.47
BEKISTING (M2) 13.33 6.67

KOLOM K2 30/30

Diameter
No Jenis Panjang (cm) Jumlah Total Panjang (cm) 0.6 0.8 1 1.2 1.4 1.6 1.9 2.2 2.5 Total Berat (kg)

1 KOLOM K2 30/30 - 400


a= 28.00
b= 24.00
c= 24.00
d= 28.00
104.00 20 2,080.00 2,080.00

a= 412.00 8 3,296.00 3,296.00

TOTAL PANJANG (CM) - 2,080.00 - 3,296.00 - - - - -


BERAT BAJA TULANGAN (KG/CM) 0.002219 0.003946 0.006170 0.008880 0.012100 0.015780 0.022260 0.029840 0.038530
BERAT TOTAL (KG) - 8.21 - 29.27 - - - - - 37.48
VOLUME BETON 1 M' 0.36
BERAT BESI 1 M3 BETON (KG) PANJANG (M') 2.78 104.10
BEKISTING (M2) 13.33 6.67
KOLOM K3 30/30

Diameter
No Jenis Panjang (cm) Jumlah Total Panjang (cm) 0.6 0.8 1 1.2 1.4 1.6 1.9 2.2 2.5 Total Berat (kg)

1 KOLOM K3 30/30 - 400


a= 28.00
b= 25.00
c= 25.00
d= 28.00
106.00 20 2,120.00 2,120.00

a= 412.00 6 2,472.00 2,472.00

TOTAL PANJANG (CM) 2,120.00 - - 2,472.00 - - - - -


BERAT BAJA TULANGAN (KG/CM) 0.002219 0.003946 0.006170 0.008880 0.012100 0.015780 0.022260 0.029840 0.038530
BERAT TOTAL (KG) 4.71 - - 21.95 - - - - - 26.66
VOLUME BETON 1 M' 0.36
BERAT BESI 1 M3 BETON (KG) PANJANG (M') 2.78 74.05
BEKISTING (M2) 13.33 6.67

KOLOM K1 25/25

Diameter
No Jenis Panjang (cm) Jumlah Total Panjang (cm) 0.6 0.8 1 1.2 1.4 1.6 1.9 2.2 2.5 Total Berat (kg)

1 KOLOM K5 20/25 - 300


a= 23.00
b= 20.00
c= 20.00
d= 23.00
86.00 16 1,376.00 1,376.00

a= 312.00 6 1,872.00 1,872.00

TOTAL PANJANG (CM) 1,376.00 - - 1,872.00 - - - - -


BERAT BAJA TULANGAN (KG/CM) 0.002219 0.003946 0.006170 0.008880 0.012100 0.015780 0.022260 0.029840 0.038530
BERAT TOTAL (KG) 3.05 - - 16.62 - - - - - 19.68
VOLUME BETON 1 M' 0.19
BERAT BESI 1 M3 BETON (KG) PANJANG (M') 5.33 104.95
BEKISTING (M2) 16.00 8.00
KOLOM K2 20/20

Diameter
No Jenis Panjang (cm) Jumlah Total Panjang (cm) 0.6 0.8 1 1.2 1.4 1.6 1.9 2.2 2.5 Total Berat (kg)

1 KOLOM K2 20/20 - 300


a= 18.00
b= 15.00
c= 15.00
d= 18.00
66.00 16 1,056.00 1,056.00

a= 340.00 4 1,360.00 1,360.00

TOTAL PANJANG (CM) 1,056.00 - 1,360.00 - - - - - -


BERAT BAJA TULANGAN (KG/CM) 0.002219 0.003946 0.006170 0.008880 0.012100 0.015780 0.022260 0.029840 0.038530
BERAT TOTAL (KG) 2.34 - 8.39 - - - - - - 10.73
VOLUME BETON 1 M' 0.14
BERAT BESI 1 M3 BETON (KG) PANJANG (M') 7.14 76.68
BEKISTING (M2) 20.00 10.00

KOLOM KP 15/15

Diameter
No Jenis Panjang (cm) Jumlah Total Panjang (cm) 0.6 0.8 1 1.2 1.4 1.6 1.9 2.2 2.5 Total Berat (kg)

1 KOLOM KP 15/15 - 300


a= 13.00
b= 10.00
c= 10.00
d= 13.00
46.00 16 736.00 736.00

a= 340.00 4 1,360.00 1,360.00

TOTAL PANJANG (CM) 736.00 - 1,360.00 - - - - - -


BERAT BAJA TULANGAN (KG/CM) 0.002219 0.003946 0.006170 0.008880 0.012100 0.015780 0.022260 0.029840 0.038530
BERAT TOTAL (KG) 1.63 - 8.39 - - - - - - 10.02
VOLUME BETON 1 M' 0.07
BERAT BESI 1 M3 BETON (KG) PANJANG (M') 14.81 148.51
BEKISTING (M2) 26.67 13.33
SLOOF S1 20/30

Diameter
No Jenis Panjang (cm) Jumlah Total Panjang (cm) 0.6 0.8 1 1.2 1.4 1.6 1.9 2.2 2.5 Total Berat (kg)

1 SLOOF S1 20/30 - 300


a= 28.00
b= 15.00
c= 25.00
d= 18.00
86.00 18 1,548.00 1,548.00

a= 318.33 6 1,910.00 1,910.00

TOTAL PANJANG (CM) 1,548.00 - 1,910.00 - - - - - -


BERAT BAJA TULANGAN (KG/CM) 0.002219 0.003946 0.006170 0.008880 0.012100 0.015780 0.022260 0.029840 0.038530
BERAT TOTAL (KG) 3.44 - 11.78 - - - - - - 15.22
VOLUME BETON 1 M' 0.18
BERAT BESI 1 M3 BETON (KG) PANJANG (M') 5.56 84.56
BEKISTING (M2) 10.00 - 5.00

SLOOF S2 20/25

Diameter
No Jenis Panjang (cm) Jumlah Total Panjang (cm) 0.6 0.8 1 1.2 1.4 1.6 1.9 2.2 2.5 Total Berat (kg)

1 SLOOF S2 20/25 - 300


a= 23.00
b= 15.00
c= 20.00
d= 18.00
76.00 17 1,292.00 1,292.00

a= 315.00 5 1,575.00 1,575.00

TOTAL PANJANG (CM) 1,292.00 - - 1,575.00 - - - - -


BERAT BAJA TULANGAN (KG/CM) 0.002219 0.003946 0.006170 0.008880 0.012100 0.015780 0.022260 0.029840 0.038530
BERAT TOTAL (KG) 2.87 - - 13.99 - - - - - 16.85
VOLUME BETON 1 M' 0.09
BERAT BESI 1 M3 BETON (KG) PANJANG (M') 11.11 187.26
BEKISTING (M2) 13.33 6.67
SLOOF S3 15/20

Diameter
No Jenis Panjang (cm) Jumlah Total Panjang (cm) 0.6 0.8 1 1.2 1.4 1.6 1.9 2.2 2.5 Total Berat (kg)

1 SLOOF S2 15/20 - 300


a= 18.00
b= 10.00
c= 15.00
d= 13.00
56.00 18 1,008.00 1,008.00

a= 318.33 4 1,273.33 1,273.33

TOTAL PANJANG (CM) 1,008.00 - 1,273.33 - - - - - -


BERAT BAJA TULANGAN (KG/CM) 0.002219 0.003946 0.006170 0.008880 0.012100 0.015780 0.022260 0.029840 0.038530
BERAT TOTAL (KG) 2.24 - 7.86 - - - - - - 10.09
VOLUME BETON 1 M' 0.09
BERAT BESI 1 M3 BETON (KG) PANJANG (M') 11.11 112.15
BEKISTING (M2) 13.33 6.67

BALOK B1 20/30

Diameter
No Jenis Panjang (cm) Jumlah Total Panjang (cm) 0.6 0.8 1 1.2 1.4 1.6 1.9 2.2 2.5 Total Berat (kg)

1 BALOK B1 20/30 - 300


a= 28.00
b= 15.00
c= 25.00
d= 18.00
86.00 18 1,548.00 1,548.00

a= 322.00 6 1,932.00 1,932.00

TOTAL PANJANG (CM) 1,548.00 - - 1,932.00 - - - - -


BERAT BAJA TULANGAN (KG/CM) 0.002219 0.003946 0.006170 0.008880 0.012100 0.015780 0.022260 0.029840 0.038530
BERAT TOTAL (KG) 3.44 - - 17.16 - - - - - 20.59
VOLUME BETON 1 M' 0.18
BERAT BESI 1 M3 BETON (KG) PANJANG (M') 5.56 114.40
BEKISTING (M2) 13.33 6.67
BALOK B2 25/35

Diameter
No Jenis Panjang (cm) Jumlah Total Panjang (cm) 0.6 0.8 1 1.2 1.4 1.6 1.9 2.2 2.5 Total Berat (kg)

1 Balok B2 25/35 - 300


a= 34.00
b= 19.00
c= 29.00
d= 24.00
106.00 17 1,802.00 1,802.00

a= 324.00 7 2,268.00 2,268.00

TOTAL PANJANG (CM) - - 1,802.00 - - 2,268.00 - - -


BERAT BAJA TULANGAN (KG/CM) 0.002219 0.003946 0.006170 0.008880 0.012100 0.015780 0.022260 0.029840 0.038530
BERAT TOTAL (KG) - - 11.12 - - 35.79 - - - 46.91
VOLUME BETON 1 M' 0.26
BERAT BESI 1 M3 BETON (KG) PANJANG (M') 3.81 178.69
BEKISTING (M2) 10.86 5.43

BALOK B3 20/25

Diameter
No Jenis Panjang (cm) Jumlah Total Panjang (cm) 0.6 0.8 1 1.2 1.4 1.6 1.9 2.2 2.5 Total Berat (kg)

1 Balok B3 20/25 - 300


a= 24.00
b= 15.00
c= 20.00
d= 19.00
78.00 17 1,326.00 1,326.00

a= 318.00 6 1,908.00 1,908.00

TOTAL PANJANG (CM) - 1,326.00 - 1,908.00 - - - - -


BERAT BAJA TULANGAN (KG/CM) 0.002219 0.003946 0.006170 0.008880 0.012100 0.015780 0.022260 0.029840 0.038530
BERAT TOTAL (KG) - 5.23 - 16.94 - - - - - 22.17
VOLUME BETON 1 M' 0.15
BERAT BESI 1 M3 BETON (KG) PANJANG (M') 6.67 147.83
BEKISTING (M2) 14.00 7.00
BALOK B2 15/20

Diameter
No Jenis Panjang (cm) Jumlah Total Panjang (cm) 0.6 0.8 1 1.2 1.4 1.6 1.9 2.2 2.5 Total Berat (kg)

1 Balok B2 15/20 - 300


a= 18.00
b= 10.00
c= 15.00
d= 13.00
56.00 18 1,008.00 1,008.00

a= 318.33 4 1,273.33 1,273.33

TOTAL PANJANG (CM) 1,008.00 - 1,273.33 - - - - - -


BERAT BAJA TULANGAN (KG/CM) 0.002219 0.003946 0.006170 0.008880 0.012100 0.015780 0.022260 0.029840 0.038530
BERAT TOTAL (KG) 2.24 - 7.86 - - - - - - 10.09
VOLUME BETON 1 M' 0.09
BERAT BESI 1 M3 BETON (KG) PANJANG (M') 11.11 112.15
BEKISTING (M2) 18.33 9.17

BALOK B5 10/20

Diameter
No Jenis Panjang (cm) Jumlah Total Panjang (cm) 0.6 0.8 1 1.2 1.4 1.6 1.9 2.2 2.5 Total Berat (kg)

1 Balok B5 10/20 - 300


a= 18.00
b= 5.00
c= 15.00
d= 8.00
46.00 17 782.00 782.00

a= 318.00 4 1,272.00 1,272.00

TOTAL PANJANG (CM) 782.00 - - 1,272.00 - - - - -


BERAT BAJA TULANGAN (KG/CM) 0.002219 0.003946 0.006170 0.008880 0.012100 0.015780 0.022260 0.029840 0.038530
BERAT TOTAL (KG) 1.74 - - 11.30 - - - - - 13.03
VOLUME BETON 1 M' 0.06
BERAT BESI 1 M3 BETON (KG) PANJANG (M') 16.67 217.18
BEKISTING (M2) 20.00 10.00
BALOK KONSUL

Diameter
No Jenis Panjang (cm) Jumlah Total Panjang (cm) 0.6 0.8 1 1.2 1.4 1.6 1.9 2.2 2.5 Total Berat (kg)

1 Balok Konsul
a= 20.00
b= 20.00
c= 15.00
d= 25.00
80.00 5 400.00 400.00

a= 152.00 2 304.00 304.00

TOTAL PANJANG (CM) - 400.00 - 304.00 - - - - -


BERAT BAJA TULANGAN (KG/CM) 0.002219 0.003946 0.006170 0.008880 0.012100 0.015780 0.022260 0.029840 0.038530
BERAT TOTAL (KG) - 1.58 - 2.70 - - - - - 4.28
VOLUME BETON 1 M' 0.03
BERAT BESI 1 M3 BETON (KG) PANJANG (M') 36.36 155.55
BEKISTING (M2) 14.00 7.00

BALOK BLSP-A 25/35

Diameter
No Jenis Panjang (cm) Jumlah Total Panjang (cm) 0.6 0.8 1 1.2 1.4 1.6 1.9 2.2 2.5 Total Berat (kg)

1 Balok BLSP-A 25/35 - 300


a= 34.00
b= 19.00
c= 29.00
d= 24.00
106.00 17 1,802.00 1,802.00

a= 324.00 7 2,268.00 2,268.00

Pelat Lisplang, T = 10 Cm

a= 108.00 3 324.00 324.00

TOTAL PANJANG (CM) - 324.00 1,802.00 - - 2,268.00 - - -


BERAT BAJA TULANGAN (KG/CM) 0.002219 0.003946 0.006170 0.008880 0.012100 0.015780 0.022260 0.029840 0.038530
BERAT TOTAL (KG) - 1.28 11.12 - - 35.79 - - - 48.19
VOLUME BETON 1 M' 0.30
BERAT BESI 1 M3 BETON (KG) PANJANG (M') 3.35 161.43
BEKISTING (M2) 12.06 6.03
BALOK BLSP-B 20/25

Diameter
No Jenis Panjang (cm) Jumlah Total Panjang (cm) 0.6 0.8 1 1.2 1.4 1.6 1.9 2.2 2.5 Total Berat (kg)

1 Balok BLSP 20/25 - 300


a= 23.00
b= 15.00
c= 20.00
d= 18.00
76.00 17 1,292.00 1,292.00

a= 318.00 6 1,908.00 1,908.00

Pelat Lisplang, T = 10 Cm

a= 308.00 2 616.00 616.00


b= 58.00 30 1,740.00 1,740.00

TOTAL PANJANG (CM) 1,292.00 2,356.00 - 1,908.00 - - - - -


BERAT BAJA TULANGAN (KG/CM) 0.002219 0.003946 0.006170 0.008880 0.012100 0.015780 0.022260 0.029840 0.038530
BERAT TOTAL (KG) 2.87 9.30 - 16.94 - - - - - 29.11
VOLUME BETON 1 M' 0.21
BERAT BESI 1 M3 BETON (KG) PANJANG (M') 4.76 138.60
BEKISTING (M2) 15.71 7.86

BALOK BLSPTG 20/30

Diameter
No Jenis Panjang (cm) Jumlah Total Panjang (cm) 0.6 0.8 1 1.2 1.4 1.6 1.9 2.2 2.5 Total Berat (kg)

1 Balok BLSP 20/25 - 300


a= 28.00
b= 15.00
c= 25.00
d= 18.00
86.00 17 1,462.00 1,462.00

a= 318.00 6 1,908.00 1,908.00

Pelat Lisplang, T = 10 Cm

a= 308.00 2 616.00 616.00


b= 58.00 30 1,740.00 1,740.00

Pelat Talang, T = 10 Cm

a= 308.00 11 3,388.00 3,388.00


b= 113.00 30 3,390.00 3,390.00
TOTAL PANJANG (CM) 1,462.00 9,134.00 - 1,908.00 - - - - -
BERAT BAJA TULANGAN (KG/CM) 0.002219 0.003946 0.006170 0.008880 0.012100 0.015780 0.022260 0.029840 0.038530
BERAT TOTAL (KG) 3.24 36.04 - 16.94 - - - - - 56.23
VOLUME BETON 1 M' 0.40
BERAT BESI 1 M3 BETON (KG) PANJANG (M') 2.47 138.83
BEKISTING (M2) 19.26 9.63

RINGBALOK RB1 15/20

Diameter
No Jenis Panjang (cm) Jumlah Total Panjang (cm) 0.6 0.8 1 1.2 1.4 1.6 1.9 2.2 2.5 Total Berat (kg)

1 Ring Balok RB1 15/20 - 300


a= 18.00
b= 10.00
c= 15.00
d= 13.00
56.00 18 1,008.00 1,008.00

a= 318.33 4 1,273.33 1,273.33

TOTAL PANJANG (CM) 1,008.00 - 1,273.33 - - - - - -


BERAT BAJA TULANGAN (KG/CM) 0.002219 0.003946 0.006170 0.008880 0.012100 0.015780 0.022260 0.029840 0.038530
BERAT TOTAL (KG) 2.24 - 7.86 - - - - - - 10.09
VOLUME BETON 1 M' 0.09
BERAT BESI 1 M3 BETON (KG) PANJANG (M') 11.11 112.15
BEKISTING (M2) 15.00 7.50

RINGBALOK RB2 10/15

Diameter
No Jenis Panjang (cm) Jumlah Total Panjang (cm) 0.6 0.8 1 1.2 1.4 1.6 1.9 2.2 2.5 Total Berat (kg)

1 Ring Balok RB2 10/15 - 300


a= 18.00
b= 5.00
c= 15.00
d= 8.00
46.00 17 782.00 782.00

a= 315.00 4 1,260.00 1,260.00

TOTAL PANJANG (CM) 782.00 - 1,260.00 - - - - - -


BERAT BAJA TULANGAN (KG/CM) 0.002219 0.003946 0.006170 0.008880 0.012100 0.015780 0.022260 0.029840 0.038530
BERAT TOTAL (KG) 1.74 - 7.77 - - - - - - 9.51
VOLUME BETON 1 M' 0.05
BERAT BESI 1 M3 BETON (KG) PANJANG (M') 22.22 211.33
BEKISTING (M2) 20.00 10.00

PELAT TANGGA, T = 12 CM

Diameter
No Jenis Panjang (cm) Jumlah Total Panjang (cm) 0.6 0.8 1 1.2 1.4 1.6 1.9 2.2 2.5 Total Berat (kg)

1 Pelat Tangga, T = 12 Cm

a= 106.00 14 1,484.00 1,484.00


b= 105.00 14 1,470.00 1,470.00

TOTAL PANJANG (CM) - - 1,484.00 1,470.00 - - - - -


BERAT BAJA TULANGAN (KG/CM) 0.002219 0.003946 0.006170 0.008880 0.012100 0.015780 0.022260 0.029840 0.038530
BERAT TOTAL (KG) - - 9.16 13.05 - - - - - 22.21
VOLUME BETON 1 M' 0.12
BERAT BESI 1 M3 BETON (KG) PANJANG (M') 8.33 185.08
BEKISTING (M2) 3.00 - 3.00

PONDASI TANGGA

Diameter
No Jenis Panjang (cm) Jumlah Total Panjang (cm) 0.6 0.8 1 1.2 1.4 1.6 1.9 2.2 2.5 Total Berat (kg)

1 PONDASI TAPAK TANGGA

a= 143.50
b= 25.00
c= 137.50
d= 36.00
342.00 6 2,052.00 2,052.00

a= 91.00
b= 25.00
c= 85.00
d= 36.00
237.00 10 2,370.00 2,370.00

2 DINDING PONDASI TANGGA

a= 36.00
b= 177.50
d= 183.50
397.00 10 3,970.00 3,970.00
a= 142.50
b= 10.00
c= 137.50
d= 15.00
305.00 10 3,050.00 3,050.00

3 COUNTERFORT DINDING TANGGA

a= 15.00
b= 150.00
c= 27.50
d= 35.00
227.50 4 910.00 910.00

a= 81.00 18 1,458.00 1,458.00

TOTAL PANJANG (CM) 1,458.00 - 3,960.00 8,392.00 - - - - -


BERAT BAJA TULANGAN (KG/CM) 0.002219 0.003946 0.006170 0.008880 0.012100 0.015780 0.022260 0.029840 0.038530
BERAT TOTAL (KG) 3.24 - 24.43 74.52 - - - - - 102.19
VOLUME BETON 1 M' 0.74
BERAT BESI 1 M3 BETON (KG) JUMLAH (BH) 1.35 138.26
BEKISTING (M2) 6.92 - 6.92

PELAT LANTAI, T = 10 CM

Diameter
No Jenis Panjang (cm) Jumlah Total Panjang (cm) 0.6 0.8 1 1.2 1.4 1.6 1.9 2.2 2.5 Total Berat (kg)

1 Pelat Lantai, T = 10 Cm

a= 104.00 10 1,040.00 1,040.00


b= 104.00 10 1,040.00 1,040.00

TOTAL PANJANG (CM) - 2,080.00 - - - - - - -


BERAT BAJA TULANGAN (KG/CM) 0.002219 0.003946 0.006170 0.008880 0.012100 0.015780 0.022260 0.029840 0.038530
BERAT TOTAL (KG) - 8.21 - - - - - - - 8.21
VOLUME BETON 1 M' 0.10
BERAT BESI 1 M3 BETON (KG) PANJANG (M') 10.00 82.07
BEKISTING (M2) 10.00 10.00
SUDUT
30 200.00
230.94

30.94 16.00

SUDUT
45 150.00
212.13

62.13 41.42

Anda mungkin juga menyukai