NO URAIAN KERJA

.
- Beton Balok B6 30x60
- Beton Plat lantai
- Beton Plat lantai Canopy /Dak
- Beton Plat tangga

LANTAI ROOF TOP


- Beton Kolom K1 60x80
- Beton Kolom K2 60x60
- Beton Kolom K3 50x50
- Beton Kolom K4 40x40
- Beton Dinding Geser Type SW-1
- Beton Dinding Geser Type SW-2
- Beton Balok B1 35x70
- Beton Balok B2 25x50
- Beton Balok B3 25x40
- Beton Balok B4 20x30
- Beton Balok B5 20x40
- Beton Balok B6 30x60
- Beton Plat lantai
- Beton Plat lantai Canopy /Dak
- Beton Plat tangga

Lantai Dak Atap Lift / Ruang mesin lift


- Beton Kolom K1 60x80
- Beton Kolom K2 60x60
- Beton Kolom K3 50x50
- Beton Kolom K4 40x40
- Beton Dinding Geser Type SW-1
- Beton Dinding Geser Type SW-2
- Beton Balok B1 35x70
- Beton Balok B2 25x50
- Beton Balok B3 25x40
- Beton Balok B4 20x30
- Beton Balok B5 20x40
- Beton Balok B6 30x60
- Beton Plat lantai
- Beton Plat lantai Canopy /Dak
- Beton Plat tangga

SUB JUMLAH B I
B.II PEKERJAAN PEMBESIAN
Pekerjaan pembesian BJTD 40 dan BJTP 24 sesuai spesifikasi dan gambar pada :

LANTAI UG & LG
- Pembesian Kolom
- Pembesian Dinding Geser
- Pembesian Balok
- Pembesian Plat lantai
- Pembesian Plat tangga

LANTAI SATU .DUA & TIGA


- Pembesian Kolom
- Pembesian Dinding Geser
- Pembesian Balok
- Pembesian Plat lantai
- Pembesian Plat lantai (Dak / Canopy)
- Pembesian Plat tangga

LANTAI EMPAT, LIMA , ENAM & TUJUH


- Pembesian Kolom
- Pembesian Dinding Geser
- Pembesian Balok
- Pembesian Plat lantai
- Pembesian Plat lantai (Dak / Canopy)
- Pembesian Plat tangga

LANTAI DELAPAN - DELAPAN BELAS.


- Pembesian Kolom
- Pembesian Dinding Geser
- Pembesian Balok
- Pembesian Plat lantai
- Pembesian Plat lantai (Dak / Canopy)
- Pembesian Plat tangga

Lantai Dak Atap


- Pembesian Kolom
- Pembesian Dinding Geser
- Pembesian Balok
- Pembesian Plat lantai
- Pembesian Plat lantai (Dak / Canopy)
- Pembesian Plat tangga

Lantai Dak Atap Lift


- Pembesian Kolom
- Pembesian Dinding Geser
- Pembesian Balok
- Pembesian Plat lantai
- Pembesian Plat lantai (Dak / Canopy)
- Pembesian Plat tangga

SUB JUMLAH B II
B. III PEKERJAAN BEKISTING
Pekerjaan bekisting fair face sesuai spesifikasi dan gambar pada :

LANTAI UG & LG
- Beton Kolom K1 60x80
- Beton Kolom K2 60x60
- Beton Kolom K3 50x50
- Beton Kolom K4 40x40
- Beton Dinding Geser Type SW-1
- Beton Dinding Geser Type SW-2
- Beton Balok B1 35x70
- Beton Balok B2 25x50
- Beton Balok B3 25x40
- Beton Balok B4 20x30
- Beton Balok B5 20x40
- Beton Balok B6 30x60
- Beton Plat lantai
- Beton Plat tangga

LANTAI SATU , DUA DAN TIGA


- Beton Kolom K1 60x80
- Beton Kolom K2 60x60
- Beton Kolom K3 50x50
- Beton Kolom K4 40x40
- Beton Dinding Geser Type SW-1
- Beton Dinding Geser Type SW-2
- Beton Balok B1 35x70
- Beton Balok B2 25x50
- Beton Balok B3 25x40
- Beton Balok B4 20x30
- Beton Balok B5 20x40
- Beton Balok B6 30x60
- Beton Plat lantai
- Beton Plat lantai Canopy /Dak
- Beton Plat tangga
LANTAI EMPAT , LIMA ,ENAM & TUJUH
- Beton Kolom K1 60x80
- Beton Kolom K2 60x60
- Beton Kolom K3 50x50
- Beton Kolom K4 40x40
- Beton Dinding Geser Type SW-1
- Beton Dinding Geser Type SW-2
- Beton Balok B1 35x70
- Beton Balok B2 25x50
UNIT HARGA JUMLAH HARGA TOTAL HARGA
SATUAN
66.00 m³ Rp 2,400,000 Rp 158,400,000.00
4015.00 m³ Rp 2,400,000 Rp 9,636,000,000.00
- m³ Rp 2,400,000 Rp -
275.00 m³ Rp 2,700,000 Rp 742,500,000.00
Rp 20,103,600,000.00

- m³ Rp 2,700,000 Rp -
405.00 m³ Rp 2,700,000 Rp 1,093,500,000.00
- m³ Rp 2,700,000 Rp -
15.00 m³ Rp 2,700,000 Rp 40,500,000.00
21.00 m³ Rp 2,700,000 Rp 56,700,000.00
132.00 m³ Rp 2,700,000 Rp 356,400,000.00
- m³ Rp 2,400,000 Rp
- m³ Rp 2,400,000 Rp
- m³ Rp 2,400,000 Rp
- m³ Rp 2,400,000 Rp
498.00 m³ Rp 2,400,000 Rp 1,195,200,000.00
- m³ Rp 2,400,000 Rp
16.00 m³ Rp 2,400,000 Rp 38,400,000.00
912.00 m³ Rp 2,400,000 Rp 2,188,800,000.00
60.00 m³ Rp 2,700,000 Rp 162,000,000.00
Rp 5,131,500,000.00

- m³ Rp 2,700,000 Rp -
36.00 m³ Rp 2,700,000 Rp 97,200,000.00
- m³ Rp 2,700,000 Rp -
15.00 m³ Rp 2,700,000 Rp 40,500,000.00
13.00 m³ Rp 2,700,000 Rp 35,100,000.00
82.50 m³ Rp 2,700,000 Rp 222,750,000.00
- m³ Rp 2,400,000 Rp -
- m³ Rp 2,400,000 Rp -
- m³ Rp 2,400,000 Rp -
- m³ Rp 2,400,000 Rp -
52.00 m³ Rp 2,400,000 Rp 124,800,000.00
- m³ Rp 2,400,000 Rp
- m³ Rp 2,400,000 Rp
15.00 m³ Rp 2,400,000 Rp 36,000,000.00
- m³ Rp 2,700,000 Rp -
Rp 556,350,000.00
Rp 178,426,116,000.00 152634666000
37,676.00 kg Rp 27,500 Rp 1,036,090,000.00
15,505.00 kg Rp 27,500 Rp 426,387,500.00
75,856.00 kg Rp 27,500 Rp 2,086,040,000.00
37,976.00 kg Rp 27,500 Rp 1,044,340,000.00
4,200.00 kg Rp 27,500 Rp 115,500,000.00

63,441.00 kg Rp 27,500 Rp 1,744,627,500.00


20,081.00 kg Rp 27,500 Rp 552,227,500.00
83,372.00 kg Rp 27,500 Rp 2,292,730,000.00
37,884.00 kg Rp 27,500 Rp 1,041,810,000.00
8,360.00 kg Rp 27,500 Rp 229,900,000.00
7,000.00 kg Rp 27,500 Rp 192,500,000.00

50,888.00 kg Rp 27,500 Rp 1,399,420,000.00


17,850.00 kg Rp 27,500 Rp 490,875,000.00
80,674.00 kg Rp 27,500 Rp 2,218,535,000.00
40,207.00 kg Rp 27,500 Rp 1,105,692,500.00
- kg Rp 27,500 Rp
8,750.00 kg Rp 27,500 Rp 240,625,000.00

279,663.00 kg Rp 27,500 Rp 7,690,732,500.00


98,175.00 kg Rp 27,500 Rp 2,699,812,500.00
443,706.00 kg Rp 27,500 Rp 12,201,915,000.00
221,138.00 kg Rp 27,500 Rp 6,081,295,000.00
- kg Rp 27,500 Rp
48,128.00 kg Rp 27,500 Rp 1,323,520,000.00

73,752.00 kg Rp 27,500 Rp 2,028,180,000.00


26,775.00 kg Rp 27,500 Rp 736,312,500.00
68,508.00 kg Rp 27,500 Rp 1,883,970,000.00
891.00 kg Rp 27,500 Rp 24,502,500.00
50,259.00 kg Rp 27,500 Rp 1,382,122,500.00
10,500.00 kg Rp 27,500 Rp 288,750,000.00
8,736.00 kg Rp 27,500 Rp 240,240,000.00
16,734.00 kg Rp 27,500 Rp 460,185,000.00
5,610.00 kg Rp 27,500 Rp 154,275,000.00
- kg Rp 27,500 Rp
743.00 kg Rp 27,500 Rp 20,432,500.00
- kg Rp 27,500 Rp -

Rp 53,433,545,000.00 53433545000

780.00 m² Rp 300,000 Rp 234,000,000.00


1128.00 m² Rp 300,000 Rp 338,400,000.00
- m² Rp 300,000 Rp
201.00 m² Rp 300,000 Rp 60,300,000.00
234.00 m² Rp 300,000 Rp 70,200,000.00
864.00 m² Rp 300,000 Rp 259,200,000.00
3,864.00 m² Rp 550,000 Rp 2,125,200,000.00
540.00 m² Rp 550,000 Rp 297,000,000.00
1248.00 m² Rp 550,000 Rp 686,400,000.00
1287.00 m² Rp 550,000 Rp 707,850,000.00
- m² Rp Rp
144.00 m² Rp 550,000 Rp 79,200,000.00
8,631.00 m² Rp 300,000 Rp 2,589,300,000.00
240.00 m² Rp 550,000 Rp 132,000,000.00

1626.00 m² Rp 300,000 Rp 487,800,000.00


1650.00 m² Rp 300,000 Rp 495,000,000.00
- m² Rp 300,000 Rp
174.00 m² Rp 300,000 Rp 52,200,000.00
174.00 m² Rp 300,000 Rp 52,200,000.00
1215.00 m² Rp 300,000 Rp 364,500,000.00
3,864.00 m² Rp 550,000 Rp 2,125,200,000.00
840.00 m² Rp 550,000 Rp 462,000,000.00
1032.00 m² Rp 550,000 Rp 567,600,000.00
1710.00 m² Rp 550,000 Rp 940,500,000.00
918.00 m² Rp 550,000 Rp 504,900,000.00
144.00 m² Rp 550,000 Rp 79,200,000.00
8,610.00 m² Rp 300,000 Rp 2,583,000,000.00
2280.00 m² Rp 300,000 Rp 684,000,000.00
399.00 m² Rp 550,000 Rp 219,450,000.00
448.00 m² Rp 300,000 Rp 134,400,000.00
3224.00 m² Rp 300,000 Rp 967,200,000.00
- m² Rp 300,000 Rp
204.00 m² Rp 300,000 Rp 61,200,000.00
240.00 m² Rp 300,000 Rp 72,000,000.00
1440.00 m² Rp 300,000 Rp 432,000,000.00
5,152.00 m² Rp 550,000 Rp 2,833,600,000.00
1120.00 m² Rp 550,000 Rp 616,000,000.00
22,313,000,000
REKAPITULASI
RENCANA ANGGARAN BIAYA
RUMAH SAKIT JATINANGOR
TANJUNGSARI KABUPATEN SUMEDANG
TAHUN 2021

PEKERJAAN STRUKTUR
NO DESKRIPSI

A PEKERJAAN STRUKTUR BAWAH


A.1 Pekerjaan Tanah

A.2 Pekerjaan Beton

B PEKPEKERJAAN STRUKTUR ATAS


B.1 Pekerjaan Beton

B.1 Pekerjaan Pembesian

B.1 Pekerjaan Bekisting

C PEKERJAAN PERALATAN UTAMA

D PEKERJAAN LAIN-LAIN

TOTAL

PPN 10%

TOTAL BIAYA
GOR
UMEDANG

JUMLAH
(Rp.)

66,030,850,580.00

46,244,200,000.00

178,426,116,000.00

53,433,545,000.00

66,428,600,000.00

9,821,750,000.00

420,385,061,580.00

42,038,506,158.00

462,423,567,738.00
RENCANA ANGGARAN BIAYA STRUKTUR
RUMAH SAKIT YASMANTI JATINANGOR - TANJUNGSARI - KABUPATEN SUMEDANG
2021

NO. URAIAN KERJA

1 2
A PEKERJAAN STRUKTUR BAWAH
A. I PEKERJAAN TANAH
Pembersihan lahan dari sampah-sampah, bekas bobokan tiang
1 pancang, semak-semak, belukar, ilalang dan pohon-pohon kecil Provisional
sehingga bersih dan siap untuk dipergunakan

Pekerjaan galian tanah untuk struktur bawah, disekelilingnya sesuai


2 spesifikasi dan gambar pada : Provisional

- Pitlift
- Pile cap
- Sloof TB 1, TB 2
- Pelat lantai

3 Pekerjaan buang tanah bekas galian keluar lokasi proyek sesuai spesifikasi dan gambar

4 Pekerjaan pasir urug tebal 100 mm termasuk pemadatan dibawah sesuai spesifikasi dan
gambar di bawah:
- Pitlift
- Pile cap
- Sloof TB 1, TB 2
- Pelat lantai

5 Pekerjaan lantai kerja tebal 50 mm dengan beton fc' 10 Mpa sesuai spesifikasi dan gambar
dibawah :
- Pitlift
- Pile cap
- Sloof TB 1, TB 2
- Pelat lantai

7 Pekerjaan bobokan tiang pancang sampai cut of level tanah termasuk Provisional
buang puing keluar proyek dan perapihannya untuk sambungan pilecap

8 Mob & Demob Alat Pancang


9 Pengadaan Spun Pile dia 600 mm

10 Pemancangan Spun Pile dia 600 mm

11 PDA Test

SUB JUMLAH A.I

A.II PEKERJAAN BETON

Pekerjaan beton mutu fc' 30 MPa (max. Flay Ash 10%) (max. Flay Ash 10%) dengan
1 termasuk pemasangan waterplack setiap sambungan
pengecoran sesuai spesifikasi dan gambar pada :
- Pit Lift
- Pile Cap
- Tie Beam
- Lantai Basement
Pekerjaan pembesian BJTD 40 dan BJTP 24 sesuai spesifikasi dan gambar pada :
2

- Pit Lift
- Pile Cap
- Tie Beam
- Plat Lantai Dasar

3 Pekerjaan bekisting batako include plastik sheet sesuai spesifikasi dan gambar pada :
TEN SUMEDANG

UNIT HARGA JUMLAH HARGA TOTAL HARGA


SATUAN
3 4 5=3x4 6

4,300.00 m² 10000 Rp 43,000,000.00

- m³ 200,000 Rp -
5,400.00 m³ 200,000 Rp 126,510,580.00
1380.00 m³ 200,000 Rp 276,000,000.00
4,720.00 m³ 200,000 Rp 944,000,000.00

6,780.00 m³ 100,000 Rp 678,000,000.00

- m³ 350,000 Rp -
330.00 m³ 350,000 Rp 115,500,000.00
180.00 m³ 350,000 Rp 63,000,000.00
394.00 m³ 350,000 Rp 137,900,000.00

- m³ Rp 800,000 Rp -
165.00 m³ 650,000 Rp 107,250,000.00
91.00 m³ 650,000 Rp 59,150,000.00
197.00 m³ 650,000 Rp 128,050,000.00

1800.00 ttk 150,000 Rp 270,000,000.00

1.00 Ls Rp 500,000,000 Rp 1,500,000,000.00


24,525.00 m' 2,000,000 Rp 49,050,000,000.00

24,525.00 m' 500,000 Rp 12,262,500,000.00

18.00 titik 15,000,000 Rp 270,000,000.00

Rp 66,030,860,580.00

108.00 m³ 2,400,000 Rp 259,200,000.00


2880.00 m³ 2,400,000 Rp 6,912,000,000.00
540.00 m³ 2,400,000 Rp 1,296,000,000.00
1820.00 m³ 1,200,000 Rp 2,184,000,000.00

27,000.00 kg 25,000 Rp 675,000,000.00


570,000.00 kg 25,000 Rp 14,250,000,000.00
57,000.00 2 25,000 Rp 1,425,000,000.00
195,000.00 kg 25,000 Rp 4,875,000,000.00
0.00 0.00
0.00 0.00

31,876,200,000.00
NO. URAIAN KERJA

- Pit Lift
- Sisi tegak Pile Cap
- Sisi tegak Tie Beam

4 Anti Rayap
- Pit Lift
- Pile Cap
- Tie Beam
- Plat Lantai Dasar

Pasangan Batu Kali Dinding Penahan Tanah

SUB JUMLAH A II
SUB JUMLAH A (STRUKTUR BAWAH)
UNIT HARGA JUMLAH HARGA TOTAL HARGA
SATUAN
452.00 m² Rp 250,000 Rp 113,000,000.00
3,600.00 m² Rp 250,000 Rp 900,000,000.00
3,600.00 m² Rp 250,000 Rp 900,000,000.00

- m² Rp 500,000 Rp -
6,000.00 m² Rp 500,000 Rp 3,000,000,000.00
4,600.00 m² Rp 500,000 Rp 2,300,000,000.00
6,750.00 m² Rp 500,000 Rp 3,375,000,000.00

2100.00 m³ Rp 1,800,000 Rp 3,780,000,000.00

Rp 46,244,200,000.00
0 Rp 19,304,195,080.00

14,368,000,000
NO. URAIAN KERJA

B PEKERJAAN STRUKTUR ATAS


B.I PEKERJAAN BETON
Pekerjaan beton mutu fc' 30 MPa (max. Flay Ash 10%) (max. Flay Ash 10%) dengan
termasuk pemasangan waterplack setiap sambungan pengecoran sesuai spesifikasi dan
gambar pada :

LANTAI UG & LG
- Beton Kolom K1 60x80
- Beton Kolom K2 60x60
- Beton Kolom K3 50x50
- Beton Kolom K4 40x40
- Beton Dinding Geser Type SW-1
- Beton Dinding Geser Type SW-2
- Beton Balok B1 35x70
- Beton Balok B2 25x50
- Beton Balok B3 25x40
- Beton Balok B4 20x30
- Beton Balok B5 20x40
- Beton Balok B6 30x60
- Beton Plat lantai
- Beton Plat tangga

LANTAI SATU , DUA & TIGA


- Beton Kolom K1 60x80
- Beton Kolom K2 60x60
- Beton Kolom K3 50x50
- Beton Kolom K4 40x40
- Beton Dinding Geser Type SW-1
- Beton Dinding Geser Type SW-2
- Beton Balok B1 35x70
- Beton Balok B2 25x50
- Beton Balok B3 25x40
- Beton Balok B4 20x30
- Beton Balok B5 20x40
- Beton Balok B6 30x60
- Beton Plat lantai
- Beton Plat lantai Canopy /Dak
- Beton Plat tangga

LANTAI EMPAT . LIMA . ENAM & TUJUH


- Beton Kolom K1 60x80
- Beton Kolom K2 60x60
- Beton Kolom K3 50x50
- Beton Kolom K4 40x40
- Beton Dinding Geser Type SW-1
- Beton Dinding Geser Type SW-2
- Beton Balok B1 35x70
- Beton Balok B2 25x50
- Beton Balok B3 25x40
- Beton Balok B4 20x30
- Beton Balok B5 20x40
- Beton Balok B6 30x60
- Beton Plat lantai
- Beton Plat lantai Canopy /Dak
- Beton Plat tangga

LANTAI DELAPAN - DELAPAN BELAS


- Beton Kolom K1 60x80
- Beton Kolom K2 60x60
- Beton Kolom K3 50x50
- Beton Kolom K4 40x40
- Beton Dinding Geser Type SW-1
- Beton Dinding Geser Type SW-2
- Beton Balok B1 35x70
- Beton Balok B2 25x50
- Beton Balok B3 25x40
- Beton Balok B4 20x30
- Beton Balok B5 20x40
526.5 HARGA JUMLAH HARGA TOTAL HARGA
SATUAN

405.00 m³ Rp 2,700,000 Rp 1,093,500,000.00


540.00 m³ Rp 2,700,000 Rp 1,458,000,000.00
- m³ Rp 2,700,000 Rp
63.00 m³ Rp 2,700,000 Rp 170,100,000.00
81.00 m³ Rp 2,700,000 Rp 218,700,000.00
315.00 m³ Rp 2,700,000 Rp 850,500,000.00
315.00 m³ Rp 2,400,000 Rp 756,000,000.00
168.00 m³ Rp 2,400,000 Rp 403,200,000.00
3600.00 m³ Rp 2,400,000 Rp 8,640,000,000.00
288.00 m³ Rp 2,400,000 Rp 691,200,000.00
- m³ Rp 2,400,000 Rp
54.00 m³ Rp 2,400,000 Rp 129,600,000.00
3150.00 m³ Rp 2,400,000 Rp 7,560,000,000.00
108.00 m³ Rp 2,700,000 Rp 291,600,000.00
Rp 22,262,400,000.00

278.64 m³ Rp 2,700,000 Rp 752,328,000.00


247.86 m³ Rp 2,700,000 Rp 669,222,000.00
- m³ Rp 2,700,000 Rp -
17.28 m³ Rp 2,700,000 Rp 46,656,000.00
23.64 m³ Rp 2,700,000 Rp 63,828,000.00
197.52 m³ Rp 2,700,000 Rp 533,304,000.00
540.00 m³ Rp 2,400,000 Rp 1,296,000,000.00
84.00 m³ Rp 2,400,000 Rp 201,600,000.00
98.40 m³ Rp 2,400,000 Rp 236,160,000.00
128.16 m³ Rp 2,400,000 Rp 307,584,000.00
73.44 m³ Rp 2,400,000 Rp 176,256,000.00
17.28 m³ Rp 2,400,000 Rp 41,472,000.00
1033.20 m³ Rp 2,400,000 Rp 2,479,680,000.00
228.00 m³ Rp 2,400,000 Rp 547,200,000.00
60.00 m³ Rp 2,700,000 Rp 162,000,000.00
Rp 7,513,290,000.00

180.00 m³ Rp 2,700,000 Rp 486,000,000.00


362.88 m³ Rp 2,700,000 Rp 979,776,000.00
- m³ Rp 2,700,000 Rp
45.00 m³ Rp 2,700,000 Rp 121,500,000.00
63.00 m³ Rp 2,700,000 Rp 170,100,000.00
396.00 m³ Rp 2,700,000 Rp 1,069,200,000.00
1620.00 m³ Rp 2,400,000 Rp 3,888,000,000.00
252.00 m³ Rp 2,400,000 Rp 604,800,000.00
315.00 m³ Rp 2,400,000 Rp 756,000,000.00
387.00 m³ Rp 2,400,000 Rp 928,800,000.00
- m³ Rp 2,400,000 Rp
54.00 m³ Rp 2,400,000 Rp 129,600,000.00
3285.00 m³ Rp 2,400,000 Rp 7,884,000,000.00
- m³ Rp 2,400,000 Rp
225.00 m³ Rp 2,700,000 Rp 607,500,000.00
Rp 17,625,276,000.00

2299.00 m³ Rp 2,700,000 Rp 6,207,300,000.00


14520.00 m³ Rp 2,700,000 Rp 39,204,000,000.00
- m³ Rp 2,700,000 Rp
605.00 m³ Rp 2,700,000 Rp 1,633,500,000.00
847.00 m³ Rp 2,700,000 Rp 2,286,900,000.00
5324.00 m³ Rp 2,700,000 Rp 14,374,800,000.00
21780.00 m³ Rp 1,200,000 Rp 26,136,000,000.00
3388.00 m³ Rp 1,200,000 Rp 4,065,600,000.00
4235.00 m³ Rp 1,200,000 Rp 5,082,000,000.00
5203.00 m³ Rp 1,200,000 Rp 6,243,600,000.00
- m³ Rp 1,200,000 Rp - 105,233,700,000

152,634,666,000.00
NO. URAIAN KERJA

- Beton Balok B3 25x40


- Beton Balok B4 20x30
- Beton Balok B5 20x40
- Beton Balok B6 30x60
- Beton Plat lantai
- Beton Plat lantai Canopy /Dak
- Beton Plat tangga

LANTAI DELAPAN - DELAPAN BELAS


- Beton Kolom K1 60x80
- Beton Kolom K2 60x60
- Beton Kolom K3 50x50
- Beton Kolom K4 40x40
- Beton Dinding Geser Type SW-1
- Beton Dinding Geser Type SW-2
- Beton Balok B1 35x70
- Beton Balok B2 25x50
- Beton Balok B3 25x40
- Beton Balok B4 20x30
- Beton Balok B5 20x40
- Beton Balok B6 30x60
- Beton Plat lantai
- Beton Plat lantai Canopy /Dak
- Beton Plat tangga

Lantai Dak Atap


- Beton Kolom K1 60x80
- Beton Kolom K2 60x60
- Beton Kolom K3 50x50
- Beton Kolom K4 40x40
- Beton Dinding Geser Type SW-1
- Beton Dinding Geser Type SW-2
- Beton Balok B1 35x70
- Beton Balok B2 25x50
- Beton Balok B3 25x40
- Beton Balok B4 20x30
- Beton Balok B5 20x40
- Beton Balok B6 30x60
- Beton Plat lantai
- Beton Plat lantai Canopy /Dak
- Beton Plat tangga
Lantai Dak Atap Lift
- Beton Kolom K1 60x80
- Beton Kolom K2 60x60
- Beton Kolom K3 50x50
- Beton Kolom K4 40x40
- Beton Dinding Geser Type SW-1
- Beton Dinding Geser Type SW-2
- Beton Balok B1 35x70
- Beton Balok B2 25x50
- Beton Balok B3 25x40
- Beton Balok B4 20x30
- Beton Balok B5 20x40
- Beton Balok B6 30x60
- Beton Plat lantai
- Beton Plat lantai Canopy /Dak
- Beton Plat tangga

SUB JUMLAH B III


C PEKERJAAN PERALATAN UTAMA
Extra Pekerjaan Pembuatan Pondasi Tower Craine dan perapihannya

- Pasir Urug dipadatkan dibawah pondasi Provisional


- Pondasi Mutu Beton fc' 25 MPa (max. Flay Ash 10%) termasuk perapih Provisional
- Pembesian Pondasi Provisional
- Bekisting biasa pada tepi pondasi Provisional

- TOTAL PEKERJAAN PERALATAN UTAMA


UNIT HARGA JUMLAH HARGA TOTAL HARGA
SATUAN
1122.00 m² Rp 550,000 Rp 617,100,000.00
1746.00 m² Rp 550,000 Rp 960,300,000.00
- m² Rp 550,000 Rp
144.00 m² Rp 550,000 Rp 79,200,000.00
9,138.00 m² Rp 300,000 Rp 2,741,400,000.00
- m² Rp 300,000 Rp
501.00 m² Rp 550,000 Rp 275,550,000.00

1232.00 m² Rp 300,000 Rp 369,600,000.00


8866.00 m² Rp 300,000 Rp 2,659,800,000.00
- m² Rp 300,000 Rp
561.00 m² Rp 300,000 Rp 168,300,000.00
660.00 m² Rp 300,000 Rp 198,000,000.00
3960.00 m² Rp 300,000 Rp 1,188,000,000.00
14,168.00 m² Rp 550,000 Rp 7,792,400,000.00
3080.00 m² Rp 550,000 Rp 1,694,000,000.00
4114.00 m² Rp 550,000 Rp 2,262,700,000.00
6402.00 m² Rp 550,000 Rp 3,521,100,000.00
- m² Rp 550,000 Rp
528.00 m² Rp 550,000 Rp 290,400,000.00
33,506.00 m² Rp 300,000 Rp 10,051,800,000.00
- m² Rp 300,000 Rp
1837.00 m² Rp 550,000 Rp 1,010,350,000.00

- m² Rp 300,000 Rp -
2706.00 m² Rp 300,000 Rp 811,800,000.00
- m² Rp 300,000 Rp -
153.00 m² Rp 300,000 Rp 45,900,000.00
180.00 m² Rp 300,000 Rp 54,000,000.00
1080.00 m² Rp 300,000 Rp 324,000,000.00
- m² Rp 550,000 Rp
- m² Rp 550,000 Rp
- m² Rp 550,000 Rp
- m² Rp 550,000 Rp
6,228.00 m² Rp 550,000 Rp 3,425,400,000.00
- m² Rp 550,000 Rp
135.00 m² Rp 300,000 Rp 40,500,000.00
9,138.00 m² Rp 300,000 Rp 2,741,400,000.00
399.00 m² Rp 300,000 Rp 119,700,000.00
- m² Rp 300,000 Rp -
231.00 m² Rp 300,000 Rp 69,300,000.00
- m² Rp 300,000 Rp -
153.00 m² Rp 300,000 Rp 45,900,000.00
114.00 m² Rp 300,000 Rp 34,200,000.00
675.00 m² Rp 300,000 Rp 202,500,000.00
- m² Rp 550,000 Rp -
- m² Rp 550,000 Rp -
- m² Rp 550,000 Rp -
- m² Rp 550,000 Rp -
510.00 m² Rp 550,000 Rp 280,500,000.00
- m² Rp 550,000 Rp -
- m² Rp 300,000 Rp -
135.00 m² Rp 300,000 Rp 40,500,000.00
- m² Rp 300,000 Rp -

Rp 66,428,600,000.00

55.00 m³ Rp 350,000 Rp 19,250,000.00


3200.00 m³ Rp 2,400,000 Rp 7,680,000,000.00
63,000.00 kg Rp 27,500 Rp 1,732,500,000.00
3000.00 m² Rp 130,000 Rp 390,000,000.00

Rp 9,821,750,000.00