Anda di halaman 1dari 20

BILL OF QUANTITY

PEKERJAAN
PEKERJAAN
: SIPIL GUDANG SEWA #3 BLOK K
NAMA KONTRAKTOR : PT. HARMONI JAYA SEJAHTERA Tanggal : 24-Apr-15

Harga
No. Uraian Pekerjaan Volume Satuan Jumlah
Satuan
A PEKERJAAN PERSIAPAN
1 Bedeng di lokasi pekerjaan 1.00 ls Rp 20,000,000 20,000,000
2 Bouwplank + pengukuran 1.00 ls Rp 20,000,000 20,000,000
3 Sewa bedeng tempat tidur pekerja 1.00 ls Rp 15,000,000 15,000,000
4 Air kerja + Listrik kerja 1.00 ls Rp 20,000,000 20,000,000
5 Keamanan 1.00 ls Rp 15,000,000 15,000,000
6 Pembersihan awal dan akhir 1.00 ls Rp 20,000,000 20,000,000
JUMLAH A 110,000,000
B RETAINING WALL
GALIAN
1 Galian tanah 403.55 m³ Rp 55,000 22,195,305
2 Lantai kerja sloof & poer, tebal 5 cm 9.40 m³ Rp 700,000 6,581,400
3 Pasir urug, tebal 10 cm 18.80 m³ Rp 210,000 3,948,840
4 Urugan tanah kembali 237.81 m³ Rp 30,000 7,134,210
BETON
1 Beton pile cap 60 x 60 - 60 K - 250 14.90 m³ Rp 850,000 12,668,400
2 Beton retaining wall T = 20 cm k-250 97.92 m³ Rp 850,000 83,232,000
3 Beton sloof 30 x 70 k-250 52.92 m³ Rp 850,000 44,982,000
4 Kolom pedestal 35 x 55 k-250 14.44 m³ Rp 850,000 12,273,894
5 Semen grouting antara kolom baja & pedestal 5 cm 0.29 m³ Rp 6,000,000 1,761,375
BESI
1 Besi pile cap 60 x 60 D13 - 10 U - 39 1,650.60 kg Rp 8,025 13,246,032
2 Besi pile cap 60 x 60 Ø 10 - 15 U - 24 595.54 kg Rp 8,025 4,779,200
3 Besi peminggang pile cap Ø 12 U - 24 147.01 kg Rp 8,025 1,179,780
4 Besi sloof 30/70 3/5 D19 U - 39 4,755.94 kg Rp 8,025 38,166,446
5 Besi peminggang sloof 2Ø10 U - 24 323.14 kg Rp 8,025 2,593,236
6 Beugel sloof Ø 10 - 10/20 U - 24 2,550.15 kg Rp 8,025 20,464,939
7 Besi retaining wall Ø 10 - 15 & 10 - 20 U - 24 11,074.43 kg Rp 8,025 88,872,266
8 Balok keliling di atas retaining wall Ø10 @ 15/30 U - 24 2,076.19 kg Rp 8,025 16,661,401
9 Besi pedestal 12 D16 U - 39 2,305.66 kg Rp 8,025 18,502,959
10 Beugel pedestal Ø10/20 U - 24 852.96 kg Rp 8,025 6,844,993
BEKISTING
1 Bekisting pile cap dengan bata miring + plester 99.36 m² Rp 80,000 7,948,800
2 Bekisting sloof dengan multiplex 352.80 m² Rp 150,000 52,920,000
3 Bekisting retaining wall dengan multiplex 18mm 1,101.60 m² Rp 250,000 275,400,000
4 Besi tie rod untuk perkuatan bekesting
(1 modul triplek isi 12bh) 585.00 bh Rp 5,000 2,925,000
5 Bekisting pedestal dgn multiplex 158.17 m² Rp 150,000 23,726,250
JUMLAH B 769,008,725
C JALUR KOLOM PEDESTAL
GALIAN
1 Galian tanah poer + sloof 290.90 m³ Rp 55,000 15,999,720
2 Lantai kerja poer dan sloof 5 cm 10.26 m³ Rp 700,000 7,182,000
3 Pasir urug 10 cm 20.52 m³ Rp 210,000 4,309,200
4 Urugan tanah kembali 124.41 m³ Rp 30,000 3,732,300
BETON
1 Pile cap 60 x 60 - 60 K - 250 22.03 m³ Rp 850,000 18,727,200
2 Sloof 30 x 70 K - 250 117.94 m³ Rp 850,000 100,245,600
3 Pedestal 35 / 55 K - 250 26.53 m³ Rp 850,000 22,550,128
4 Semen grouting antara kolom baja & pedestal 5 cm 0.98 m³ Rp 6,000,000 5,890,500
BESI
1 Pile cap 60 x 60 D 13 2,365.62 kg Rp 8,025 18,984,106
2 Pile cap 60 x 60 Ø 10 848.92 kg Rp 8,025 6,812,587
3 Besi peminggang pile cap Ø 12 U - 24 217.32 kg Rp 8,025 1,744,022
4 Besi sloof 30/70 3/5 D19 U - 39 11,809.95 kg Rp 8,025 94,774,863
5 Besi peminggang sloof 2Ø10 817.86 kg Rp 8,025 6,563,356
6 Beugel sloof Ø10 - 10/20 U - 24 5,118.92 kg Rp 8,025 41,079,306
7 Besi pedestal 6 D16 U - 39 4,178.41 kg Rp 8,025 33,531,740
BILL OF QUANTITY

PEKERJAAN
PEKERJAAN
: SIPIL GUDANG SEWA #3 BLOK K
NAMA KONTRAKTOR : PT. HARMONI JAYA SEJAHTERA Tanggal : 24-Apr-15

Harga
No. Uraian Pekerjaan Volume Satuan Jumlah
Satuan
8 Beugel pedestal Ø10/20 U - 24 1,450.84 kg Rp 8,025 11,642,964
BEKISTING
1 Bekisting pile cap dengan bata miring + plester 146.88 m² Rp 80,000 11,750,400
2 Bekisting sloof dengan multiplex 873.60 m² Rp 150,000 131,040,000
3 Bekisting multiplex untuk pedestal 266.22 m² Rp 150,000 39,933,000
4 Pasang baja siku 50/50 di sudut kolom pedestal t= 1 m 306.00 m' Rp 37,500 11,475,000
JUMLAH C 587,967,993
D LANTAI BETON
GALIAN
1 Bobok kepala tiang pancang 1,493.50 ttk Rp 20,000 29,870,000
2 Galian tanah poer 952.20 m³ Rp 55,000 52,371,000
3 Lantai kerja 5 cm 748.80 m³ Rp 700,000 524,160,000
4 Pasir urug 10 cm 1,497.60 m³ Rp 210,000 314,496,000
5 Perataan tanah kembali 13,653.50 m² Rp 5,000 68,267,500
6 Pembuangan sisa galian tanah ke luar lokasi 0.50 ls Rp 20,000,000 10,000,000
BETON
1 Beton pile cap 100 x 100 - 60 K - 350 462.87 m³ Rp 880,000 407,330,000
2 Beton plat lantai T = 25 cm K - 350 3,737.62 m³ Rp 880,000 3,289,108,625
BESI
1 Besi pile cap 100x100 D16 - 20 U - 39 51,345.67 kg Rp 8,025 412,049,010
2 Besi polos pile cap 12 mm U - 24 4,716.21 kg Rp 8,025 37,847,581
3 Wire mesh M - 8 = 2 lapis 14,976.00 m² Rp 100,000 1,497,600,000
4 Cakar ayam 7,847.80 kg Rp 8,025 62,978,582
5 Besi deletasi D16-50 96x312 548.28 kg Rp 8,025 4,399,952
BEKISTING
1 Bata miring untuk pile cap 3,174.00 m² Rp 80,000 253,920,000
2 Beton decking 29,952.00 bh Rp 500 14,976,000
FINISHING LANTAI .
1 Trowel mesin + curing compound 14,976.00 m² Rp 7,500 112,320,000
2 Floor hardener non metalic 5 kg/ m 2 14,976.00 m² Rp 17,000 254,592,000
3 Delatasi 5 mm x 10 mm dengan sealant beton 864.00 m' Rp 18,000 15,552,000
JUMLAH D 7,361,838,250
E DINDING I BRICK
1 Dinding i brick tinggi 3 m 1,098.00 m² Rp 110,000 120,780,000
2 Acia tebal ex Drymix 2,196.00 m² Rp 45,000 98,820,000
3 Kolom praktis dengan besi 2dia. 8 U - 24 186.00 m' Rp 80,000 14,880,000
4 Ring balok praktis dgn besi 2 dia. 8 U - 24 366.00 m' Rp 80,000 29,280,000
5 Stek besi pada baja WF dengan besi 8 mm 0.50 ls Rp 18,000,000 9,000,000
6 Struktur portal beton unt rolling door + cat 6.00 bh Rp 6,000,000 36,000,000
7 Scafolding 0.50 ls Rp 25,000,000 12,500,000
8 Siku list dockleveler 235.80 bh Rp 58,500 13,794,300
9 Cat dinding i brick sisi dalam ex Cendana 1,098.00 m² Rp 18,000 19,764,000
10 Cat dinding luar + retaining wall ex Mowilex 1,640.70 m² Rp 28,000 45,939,600
JUMLAH E 400,757,900
F PEKERJAAN LAIN-LAIN
1 Extra stek besi ke lantai beton dia. 10 - 15 tunggal 839.74 kg Rp 8,025 6,738,889
2 Finishing pedestal 132.50 bh Rp 80,000 10,600,000
3 Cat pedestal 102.03 m2 Rp 18,000 1,836,450
4 Pemadatan tanah 14,976.00 m2 Rp 5,000 74,880,000
5 Bekisting cor lantai 109.09 m2 Rp 175,000 19,090,909
6 Finishing retaining wall 332.10 m2 Rp 50,000 16,605,000
7 Sipil dock leveller,incl galian, beton, besi ,bekisting 26.04 m2 Rp 1,500,000 39,060,000
JUMLAH F 168,811,249
Sub Total Jumlah A s/d jumlah E 9,398,384,116
Jasa 8% 751,870,729
Total 10,150,254,845
Dibulatkan 10,150,000,000
BILL OF QUANTITY

PEKERJAAN
PEKERJAAN
: SIPIL GUDANG SEWA #3 BLOK K
NAMA KONTRAKTOR : PT. HARMONI JAYA SEJAHTERA Tanggal : 24-Apr-15

Harga
No. Uraian Pekerjaan Volume Satuan Jumlah
Satuan
PPN 1,015,000,000
Grand Total 11,165,000,000
BILL OF QUANTITY
PEKERJAAN : PEMBANGUNAN GUDANG SEWA
LOKASI : BLOK O2
PROYEK MARUNDA CENTER
NO URAIAN PEKERJAAN SPESIFIKASI TEKNIS VOL. SAT HARGA SATUAN JUMLAH HARGA

A PEKERJAAN PERSIAPAN
1 Bedeng & Gudang Pekerja 1.00 ls Rp -
2 Bouwplank, Pengukuran / Uitzet 1.00 ls Rp -
3 ABD & Dokumentasi 1.00 ls Rp -
4 Mobilisasi & Transportasi 1.00 ls Rp -
5 Air Kerja & Listrik Kerja 1.00 ls Rp -
6 Keamanan & Keselamatan Kerja 1.00 ls Rp -
7 Pembersihan Awal Dan Akhir 1.00 ls Rp -
Sub Total A Rp -
B JALUR RETAINING WALL
B.1 GALIAN
1 Galian Tanah 1,326.21 m³ Rp -
Lantai Kerja Sloof, Poer,& Retaning Wall, Tebal 5 Cm K-B.0
2 82.55 m³ Rp -
Pasir Urug Sloof, Poer,& Retaining Wall, Tebal 5 Cm
3 82.55 m³ Rp -
4 Urugan Tanah Kembali 535.91 m³ Rp -
B.2 BETON
5 Pondasi F1 fc' 30MPa 100.44 m³ Rp -
6 Pile Cap F3 fc' 30MPa 114.31 m³ Rp -
7 Pile Cap F4 fc' 30MPa 31.59 m³ Rp -
8 Pile Cap F5 fc' 30MPa 42.34 m³ Rp -
9 Retaining Wall W1 fc' 30MPa 248.64 m³ Rp -
10 Sloof TB1 fc' 30MPa 107.42 m³ Rp -
11 Kolom Pedestal PD1 fc' 30MPa 3.47 m³ Rp -
12 Kolom Pedestal PD1A fc' 30MPa 3.34 m³ Rp -
13 Kolom Pedestal PD2 fc' 30MPa 20.79 m³ Rp -
14 Kolom Pedestal PD4A fc' 30MPa 7.70 m³ Rp -
15 Kolom Pedestal PD7 fc' 30MPa 32.55 m³ Rp -
16 Kolom Pedestal PD7A fc' 30MPa 2.60 m³ Rp -
17 Kolom Pedestal PD7B fc' 30MPa 2.18 m³ Rp -
Semen Grouting Antara Kolom Baja & Pedestal, t= 5
18 CM Sika Grout 11.79 m³ Rp -

B.3 BESI
PONDASI F1
19 Besi D16-200 7,768.86 kg Rp -
PILE CAP F3
20 Besi D16-200 Cakra Steel 6,608.18 kg Rp -
PILE CAP F4
21 Besi D16-200 Cakra Steel 1,689.34 kg Rp -
PILE CAP F5
22 Besi D16-200 Cakra Steel 2,569.46 kg Rp -
TB1
23 Besi D16 Cakra Steel 7,758.43 kg Rp -
24 Besi Peminggang, 4 D10 Cakra Steel 1,514.86 kg Rp -
25 Sengkang D10-100/150 Cakra Steel 4,241.60 kg Rp -
RETAINING WALL W1
26 Besi D13-150 Cakra Steel 20,244.22 kg Rp -
PEDESTAL PD1
27 Besi, 24 D16 Cakra Steel 1,117.88 kg Rp -
28 Sengkang D13-100/150 Cakra Steel 336.79 kg Rp -
PEDESTAL PD1A
29 Besi, 24 D16 Cakra Steel 279.47 kg Rp -
30 Sengkang D13-100/150 Cakra Steel 100.67 kg Rp -
PEDESTAL PD2
31 Besi, 20 D16 Cakra Steel 2,794.70 kg Rp -
32 Sengkang D13-100/150 Cakra Steel 1,268.47 kg Rp -
PEDESAL PD4A
33 Besi, 14 D16 Cakra Steel 815.12 kg Rp -
34 Sengkang D10-100/150 Cakra Steel 327.18 kg Rp -
PEDESTAL PD7
35 Besi, 14 D16 Cakra Steel 3,831.07 kg Rp -
36 Sengkang D10-100/150 Cakra Steel 2,129.21 kg Rp -
PEDESTAL PD7A
37 Besi, 20 D16 Cakra Steel 232.89 kg Rp -
38 Sengkang D10-100/150 Cakra Steel 119.30 kg Rp -
PEDESTAL PD7B
39 Besi, 18 D16 Cakra Steel 209.60 kg Rp -
40 Sengkang D10-100/150 Cakra Steel 106.71 kg Rp -
B.4 BEKISTING
NO URAIAN PEKERJAAN SPESIFIKASI TEKNIS VOL. SAT HARGA SATUAN JUMLAH HARGA

41 Bekisting Pile Cap Dengan Pas. Bata 378.40 m² Rp -


42 Bekisting Sloof Dengan Pas. Bata 306.90 m² Rp -
Bekisting Retaining Wall Dengan Multiplek 12 MM
43 @Sisi Luar 1,243.20 m² Rp -
Bekisting Retaining Wall Dengan Pas. bata @Sisi
44 Dalam 1,268.10 m² Rp -
45 Bekisting Pedestal Dengan Multiplek 12 MM 594.22 m² Rp -
Pasang Baja Siku 50/50/5 Di Sudut Kolom Pedestal T=
46 1 M + Cat Gunung Garuda 1,425.00 kg Rp -

Sub Total B Rp -
C JALUR KOLOM PEDESTAL
C.1 GALIAN
1 Galian tanah 690.11 m³ Rp -
2 Lantai kerja poer & sloof tebal 5 cm 83.64 m³ Rp -
3 Pasir urug tebal 5 cm 83.64 m³ Rp -
4 Urugan tanah kembali 47.20 m³ Rp -
C.2 BETON
4 Pile Cap F3 fc' 30MPa 141.52 m³ Rp -
5 Pile Cap F4 fc' 30MPa 117.94 m³ Rp -
6 Pile Cap F5 fc' 30MPa 15.88 m³ Rp -
7 Sloof TB1 fc' 30MPa 98.18 m³ Rp -
8 Kolom Pedestal PD1 fc' 30MPa 3.81 m³ Rp -
9 Kolom Pedestal PD2, fc' 30MPa 10.71 m³ Rp -
10 Kolom Pedestal PD3 fc' 30MPa 8.51 m³ Rp -
11 Kolom Pedestal PD4A fc' 30MPa 5.88 m³ Rp -
12 Kolom Pedestal PD5 fc' 30MPa 16.46 m³ Rp -
13 Kolom Pedestal PD6 fc' 30MPa 28.39 m³ Rp -
14 Kolom Pedestal PD7 fc' 30MPa 9.17 m³ Rp -
Semen Grouting Antara Kolom Baja & Pedestal, t= 5
15 CM Sika Grout 20.84 m³ Rp -

C.3 BESI
PILE CAP F3
16 Besi D16-200 Cakra Steel 8,181.56 kg Rp -
PILE CAP F4
17 Besi D16-200 Cakra Steel 6,306.85 kg Rp -
PILE CAP F5
18 Besi D16-200 Cakra Steel 963.55 kg Rp -
TB1
19 Besi D16 Cakra Steel 7,091.04 kg Rp -
20 Besi Peminggang, 4 D10 Cakra Steel 1,258.68 kg Rp -
21 Sengkang D10-100/150 Cakra Steel 3,876.73 kg Rp -
PEDESTAL PD1
22 Besi, 24 D16 Cakra Steel 542.26 kg Rp -
23 Sengkang D13-100/150 Cakra Steel 231.55 kg Rp -
PEDESTAL PD2
24 Besi, 20 D16 Cakra Steel 1,598.96 kg Rp -
25 Sengkang D13-100/150 Cakra Steel 845.64 kg Rp -
PEDESTAL PD3
26 Besi, 18 D16 Cakra Steel 1,251.36 kg Rp -
27 Sengkang D10-100/150 Cakra Steel 453.91 kg Rp -
PEDESTAL PD4A
28 Besi, 14 D16 Cakra Steel 729.96 kg Rp -
29 Sengkang D10-100/150 Cakra Steel 145.58 kg Rp -
PEDESTAL PD5
30 Besi, 20 D16 Cakra Steel 1,668.48 kg Rp -
31 Sengkang D13-100/150 Cakra Steel 724.84 kg Rp -
PEDESTAL PD6
32 Besi, 16 D16 Cakra Steel 2,669.57 kg Rp -
33 Sengkang D13-100/150 Cakra Steel 1,328.87 kg Rp -
PEDESTAL PD7
34 Besi, 14 D16 Cakra Steel 1,265.26 kg Rp -
35 Sengkang D10-100/150 Cakra Steel 349.39 kg Rp -
C.4 BEKISTING
36 Bekisting Pile Cap Dengan Batako 574.06 m² Rp -
37 Bekisting Sloof Dengan Batako 561.00 m² Rp -
Bekisting Multiplek Untuk Pedestal 12 MM Rp -
38 541.38 m²
Pasang Baja Siku 50/50 Di Sudut Kolom Pedestal T= 1
Gunung Garuda
39 M + Cat besi 2,325.00 kg Rp -
Sub Total C Rp -
D LANTAI BETON
D.1 GALIAN
1 Galian Tanah Poer 611.78 m³ Rp -
2 Lantai Kerja Tebal = 5 CM K-B.0 1,615.56 m³ Rp -
3 Pasir Urug Tebal = 5 CM 1,615.56 m³ Rp -
NO URAIAN PEKERJAAN SPESIFIKASI TEKNIS VOL. SAT HARGA SATUAN JUMLAH HARGA

4 Perataan & Pemadatan Tanah, T=± 15 cm 33,984.00 m² Rp -


D.2 BETON
5 Pile Cap P2A&P2B, 100x100x25 MM fc' 30MPa 1,264.00 m³ Rp -
6 Plat Lantai, S1/S1A T = 25 CM fc' 30MPa NFA, Jidar Truss screet 8,496.00 m³ Rp -
D.3 BESI
7 Besi Pile Cap P2A, D10-150 Cakra Steel 39,405.86 kg Rp -
8 Besi Pile Cap P2B, D13-150 Cakra Steel 79,336.86 kg Rp -
9 Wiremesh M10-150 @ 2 Lapis Lionmesh 33,984.00 m2 Rp -
Extra Wiremesh M10-150, 150x150 MM Untuk P2B Lionmesh
10 6,192.00 m2 Rp -
D.4 BEKISTING
11 Bekisting Pile Cap Dengan Batako 5,056.00 m² Rp -
12 Bekisting Lantai Dengan Relat & Multiplek 4 mm 2,724.00 m' Rp -
D.5 FINISHING LANTAI
13 Finish Trowel 33,984.00 m² Rp -
14 Floor Hardener Non Metalic 5 Kg/ M2 Sika Floor 33,984.00 m² Rp -
15 Dilatasi, Sterofoam Dengan Sealant Ex. Sikaseal 978.00 m' Rp -
16 Cutter & Sealant 5mm X 10 MM Ex. Sikaseal 3,786.00 m' Rp -
17 Siku 70/70/7, List Dockleveler + Cat besi 2,612.52 kg Rp -
Sub Total D Rp -
E DINDING BATA
1 Pasang Dinding Bata Ringan, T = 3 M Delta Brick, T= 10 CM 1,787.50 m² Rp -
2 Plesteran 3,575.00 m² Rp -
3 Acian 3,575.00 m² Rp -
4 Opening Louvre Include sealant Ex. Sikaseal 630.00 m' Rp -
5 Opening Pintu 145.60 m' Rp -
6 Kolom Praktis 15x15, Besi 4 Ø 10 / Ø 8 - 15 285.00 m' Rp -
7 Ring Balok 15x15, Besi 4 Ø 10 / Ø 8 - 15 607.20 m' Rp -
Stek Besi Pada Baja WF Dengan Besi 8 MM (Per 1 M)
8 96.14 kg Rp -
Struktur Portal Beton Unt Rolling Door + Cat Rp -
9 42.00 bh
10 Cat Dinding Bata Sisi Dalam Mowilex interior 1,787.50 m² Rp -
11 Cat Dinding Luar & Retaining Wall Mowilex Weathercoat 2,692.90 m² Rp -
Sub Total E Rp -
F PEKERJAAN LAIN-LAIN
1 Bobok Kepala Tiang Pancang 5,873.00 bh Rp -
Treatment Pancang, Besi D13, incl. galian, besi, &
2 beton fc' 30MPa 817.00 ttk Rp -

3 Pembuangan Sisa Galian Tanah Ke Luar Lokasi 1.00 ls Rp -

4 Finishing Pedestal 493.71 m2 Rp -


5 Cat Pedestal Mowilex 493.71 m2 Rp -
6 Finishing Retaining Wall 905.40 m2 Rp -
Sipil Dock Leveller,Incl., Galian, Beton,
7 Besi ,Bekisting ,Pipa Sparing Kabel 32.00 unit Rp -

8 Rabat Beton / S2, T = 7 cm B.0 Finish Aci 116.50 m³ Rp -


9 Tangga Beton 14.00 unit Rp -
10 Embeded Plat & Karet Bumper 56.00 bh Rp -
Sub Total F Rp -

SUB TOTAL JUMLAH A S/D F


Rp -

DIBULAT KAN Rp -
BILL OF QUANTITY
PEKERJAAN : PELAPISAN JALAN BETON PARKIR
LOKASI : BLOK O2
PROYEK MARUNDA CENTER
NO URAIAN PEKERJAAN SPESIFIKASI TEKNIS UNIT QTY HARGA SATUAN JUMLAH HARGA

I PEKERJAAN PERSIAPAN
1 Pengukuran, bowplank / uitzet 1.00 ls -
2 ABD, dokumentasi dan test CBR 1.00 ls -
3 Mobilisasi - demobilisasi alat berat 1.00 ls -
4 Air kerja dan listrik kerja 1.00 ls -
5 Bedeng & gudang pekerja 1.00 ls -
Subtotal I -
II PEKERJAAN TANAH
1 Galian tanah t = 37 cm + buang tanah Elevasi rata² existing +3.407 4,999.55 m3 -
2 Pembentukan badan jalan dan pemadatan 13,512.30 m2 -
3 Base course t=50 cm ( di buat 2 layer 20 cm dan 30 cm ) Sidomanik/setara 13,512.30 m2 -
4 Lean concrete t=5 cm K-B.0 13,512.30 m2 -
5 Cerucuk Bambu 1 ttk / m2, t = 1 m 13,512.00 ttk -
Subtotal II -
IIIPEKERJAAN BETON DAN KANSTEEN
1 Slab beton K - 350 t=20 cm, cutter sealant & curing geotextile fc' 30MPa, finish throwel 13,512.30 m2 -
2 Pembesian wiremesh M10 Lionmesh/setara 13,512.00 m2 -
3 Pembesian untuk dowel, constr join dll (2 kg/m2) Cakra steel/setara 27,024.00 kg -
4 Expansion joint Dowel ø32 - 400 mm, sealant aspal 386.00 m1 -
5 Boks kontrol cor setempat 600x600 selasar 7.00 bh -
6 Boks kontrol cor setempat 600x600 jalan 4.00 bh -
7 Boks kontrol cor setempat 1000x1000 selasar 8.00 bh -
8 Boks kontrol cor setempat 1000x1000 jalan 10.00 bh -
9 Pemasangan kansteen Ex. Jipcon uk 25x30x60 cm 828.90 m1 -
10 Street inlet untuk drainase, pipa PVC dia 4" (AW) setiap jarak 3m Unilon 210.00 bh -
Urug kembali dengan tanah merah dan perapihan tanah sisi kansteen kiri &
828.90 m1 -
11 kanan s/d saluran
Subtotal III -
IV PEKERJAAN SALURAN DAN CROSSING
1 Galian tanah + buang tanah 294.72 m3 -
2 Pasang pipa sparing AW 4” Unilon 540.00 m1 -
3 Pasang pipa sparing AW 6” Unilon 112.00 m1 -
4 Pasang pipa sparing AW 10" Unilon 20.00 m1 -
5 Pasang box culvert 600x600x1000 mm Ex. Jipcon 270.88 m1 -
7 Pasang box culvert 1000x1000x1000 mm Ex. Jipcon 220.57 m1 -
8 Pasang saluran tertutup U-600/600/1200 mm Ex. Jipcon 89.96 m1 -
Subtotal IV -

JUMLAH I s/d IV -

PEMBULATAN -
BILL OF QUANTITY
PEKERJAAN : ATAP ZINCALUME
LOKASI : BLOK O2
PROYEK MARUNDA CENTER
NO URAIAN PEKERJAAN SPESIFIKASI TEKNIS QTY UNIT HARGA SATUAN JUMLAH HARGA

I PEKERJAAN PERSIAPAN
1 Bedeng & Gudang Pekerja 1.00 ls Rp -
2 Air & Listrik kerja 1.00 ls Rp -
3 ABD & Dokumentasi 1.00 ls Rp -
4 Mobilisasi & Transportasi @Alat Roll on site, Lansir material dll. 1.00 ls Rp -
5 Pembersihan Awal & Akhir 1.00 ls Rp -
JUMLAH I Rp -
II ATAP CHAMBER, 30 M
1 Atap Lysaght Kiplok Optima Hi-ten 0.45 mm BMT Bluescope, Profil gelombang jarak per 22 cm 8,065.14 m2 Rp -
zincalume
2 Atap Fiberglass UV Resistanc, GSM 2400 Profil GAJA 315.36 m2 Rp -
Alsynite xrp t=2 mm (profil optima)
3 Insulasi Atap @material by owner 8,065.14 m2 Rp -
4 Nok zincalume W = 600, t = 0.4 mm BMT 277.50 m1 Rp -
5 Talang FRP L Eff 1000 mm, Panjang 1000 mm dan tebal 3 mm 669.22 m2 Rp -
6 Lisplang Lysaght Trimdek t = 0.35 mm BMT colorbond 256.34 m2 Rp -
7 Flashing Lisplang W = 450, 0.35 mm BMT colorbond 181.20 m1 Rp -
JUMLAH II Rp -
III ATAP CHAMBER, 24 M
1 Atap Lysaght Kiplok Optima Hi-ten 0.45 mm BMT Bluescope, Profil gelombang jarak per 22 cm 23,191.74 m2 Rp -
zincalume
2 Atap Fiberglass UV Resistanc, GSM 2400 Profil GAJA 617.76 m2 Rp -
Alsynite xrp t=2 mm (profil optima)
3 Insulasi Atap @material by owner 23,191.74 m2 Rp -
4 Nok zincalume W = 600, t = 0.4 mm BMT 1,017.50 m1 Rp -
5 Talang FRP L Eff 1000 mm, Panjang 1000 mm dan tebal 3 mm 1,994.05 m2 Rp -
6 Lisplang Lysaght Trimdek t = 0.35 mm BMT colorbond 368.06 m2 Rp -
7 Flashing Lisplang W = 450, 0.35 mm BMT colorbond 514.80 m1 Rp -
JUMLAH III Rp -
IV KANOPI
1 Atap Lysaght Kiplok Optima Hi-ten 0.45 mm BMT Bluescope, Profil gelombang jarak per 22 cm 3,205.80 m2 Rp -
zincalume
2 Lisplang Lysaght Trimdek t = 0.35 mm BMT colorbond 275.94 m2 Rp -
3 Flashing Lisplang W = 450, 0.35 mm BMT colorbond 374.20 m1 Rp -
JUMLAH IV Rp0
V PENUTUP DINDING
1 Dinding Metal Cladding, t=0.4 mm TCT Colorbond 8,982.08 m2 Rp -
2 Flashing Metal 888.00 m1 Rp -
JUMLAH IV Rp0
VI PEKERJAAN LAIN-LAIN
1 Pipa Air Hujan PVC 8" Type AW Include aksesoris pipa, clamp, dll. 1,003.00 m1 Rp -
2 Bak kontrol talang FRP Detail Gambar 28.00 unit Rp -
JUMLAH VI Rp0
JUMLAH I s/d VI Rp0
PEMBULATAN Rp0
BILL OF QUANTITY
PEKERJAAN : STRUKTUR BAJA
LOKASI : BLOK O2
PROYEK MARUNDA CENTER
NO URAIAN PEKERJAAN SPESIFIKASI TEKNIS SAT VOL. HARGA SATUAN JUMLAH HARGA

A PEKERJAAN PERSIAPAN

1 Bedeng & Gudang Pekerja ls 1.00 Rp -

2 Bouwplank & Pengukuran ls 1.00 Rp -

3 ABD & dokumentasi ls 1.00 Rp -

4 Mobilisasi & Transportasi ls 1.00 Rp -

5 Air Kerja & Listrik Kerja ls 1.00 Rp -

6 Keamanan & Keselamatan Kerja ls 1.00 Rp -

7 Pembersihan Awal Dan Akhir ls 1.00 Rp -

Sub Total A Rp -
B PEKERJAAN METAL

1 @ KOLOM

SC1 - IWF 600x300x12x20 kg 28,974.72 Rp -


SC2 - IWF 600x200x11x17 kg 55,968.00 Rp -
SC3 - IWF 500x200x10x16 kg 17,199.94 Rp -
SC4 - IWF 400x200x8x13 kg 22,133.76 Rp -
SC5 - H 400x400x13x21 kg 49,536.00 Rp -
SC6 - H 350x350x12x19 kg 78,912.00 Rp -
SC7 - IWF 350x175x7x11 kg 50,500.74 Rp -
303,225.15 Rp -
2 @ BALOK
Material By Owner (Harga
SB1-HC 750 X 300 X 11,9 X 12 kg 15,708.65
include rekondisi karat) Rp -
SB1A - HC 882x300x12x20 kg 32,616.00 Rp -
Material By Owner (Harga
SB2-HC 750 X 300 X 11,9 X 12 kg 47,125.95
include rekondisi karat) Rp -
SB3 - H 200 X 200 X 8 X 12 @Spoor kg 33,544.00 Rp -
SB5 - H 150x150x7x10 kg 106,848.00 Rp -
SB5A - PIPA Ø4" (114,3mm, t = 4,5mm) kg 37,332.00 Rp -
BR2 - H 200 X 200 X 8 X 12 @Bracing kg 27,090.77 Rp -
G1 - C 150x65x20x3,2 @Kerangka cladding kg 64,405.66 Rp -
SG1 - Ø 16 MM @Kerangka cladding bh 2,872.00 Rp -
TOP CL - SIKU 30 X 30 X 3 kg 1,207.68 Rp -
365,878.71 Rp -
3 @ RAFTER

R1 - IWF 500x200x10x16 kg 268,792.48 Rp -


R1A - IWF 600x200x11x17 kg 133,560.00 Rp -
R2 - IWF 300x150x6.5x9 kg 11,450.40 Rp -
R3 - IWF 350x175x7x11 kg 16,665.60 Rp -
R4 - IWF 400x200x8x13 kg 3,960.00 Rp -
P1 - PURLIN - CNP 200 x 75 x 20 x 3.2 kg 276,106.95 Rp -
BR1 - Ø 19 MM kg 28,071.81 Rp -
SG1 - Ø 16 MM bh 9,660.00 Rp -
SIKU, L 40x40x3 @ Kerangka lisplang kg 4,701.13 Rp -
743,308.37 Rp -
5 @ TRUSS

L2 - L 100x100x10 kg 26,137.65 Rp -
L4 - 2L 90x90x7 kg 46,787.50 Rp -
L5 - L 60x60x6 kg 383.74 Rp -
P2 - PURLIN - CNP 150x65x20x3.2 kg 26,742.48 Rp -
Turn Buckle ROD Ø 22 mm kg 1,690.55 Rp -
SG1 - Ø 16 MM bh 472.00 Rp -
BR1 - Ø 19 MM kg 3,942.44 Rp -
LS- Hollow 40x40x3 mm @Kerangka lisplang kg 2,921.94 Rp -
108,606.30 Rp -
6 @ TALANG

SB6 - IWF 150x75x5x7 kg 380.80 Rp -


SB7 - UNP 100x50x5 kg 1,193.31 Rp -
CNP 100x50x20x3.2 kg 2,035.00 Rp -
L1 - 2L 100x100x10 kg 11,174.00 Rp -
L2 - L 100x100x10 kg 1,502.60 Rp -
L3 - L 75x75x9 kg 172.22 Rp -
P1 - PURLIN - CNP 200 x 75 x 20 x 3.2 kg 22,526.10 Rp -
HT - PL 9 X 75 MM @per 60 cm kg 24,286.21 Rp -
63,270.25 Rp -
@ PLAT BESI & MUR BAUT

7 Plat besi tebal 30 mm

SC1 - IWF 600x300x12x20 kg 1,051.98 Rp -


SC2 - IWF 600x200x11x17 kg 1,808.08 Rp -
SC3 - IWF 500x200x10x16 kg 657.48 Rp -
SC5 - H 400x400x13x21 kg 2,028.81 Rp -
SC6 - H 350x350x12x19 kg 3,409.53 Rp -
8 Plat besi tebal 26 mm

SC4 - IWF 400x200x8x13 kg 764.13 Rp -


SC7 - IWF 350x175x7x11 kg 2,745.79 Rp -
9 Plat besi tebal 24 mm

SB1-HC 750 X 300 X 11,9 X 12 kg 2,246.75 Rp -


SB1A - HC 882x300x12x20 kg 1,500.18 Rp -
SB2-HC 750 X 300 X 11,9 X 12 kg 5,887.06 Rp -
R1A - IWF 600x200x11x17 kg 4,496.60 Rp -
R4 - IWF 400x200x8x13 kg 200.61 Rp -
10 Plat besi tebal 22 mm

kg 11,548.68 Rp -
11 Plat besi tebal 18 mm

R2 - IWF 300x150x6.5x9 kg 660.21 Rp -


R3 - IWF 350x175x7x11 kg 755.58 Rp -
12 Plat besi tebal 16 mm

R1A - IWF 600x200x11x17/sambungan kg 3,721.89 Rp -


13 Plat besi tebal 15 mm

R1 - IWF 500x200x10x16 kg 2,257.14 Rp -


R1A - IWF 600x200x11x17 kg 564.28 Rp -
14 Plat besi tebal 14 mm

SC1 - IWF 600x300x12x20 kg 632.00 Rp -


SC2 - IWF 600x200x11x17 kg 1,158.66 Rp -
SC3 - IWF 500x200x10x16 kg 351.11 Rp -
SC4 - IWF 400x200x8x13 kg 438.89 Rp -
SC5 - H 400x400x13x21 kg 842.66 Rp -
SC6 - H 350x350x12x19 kg 1,290.33 Rp -
SC7 - IWF 350x175x7x11 kg 147.85 Rp -
CUT OF R1 - IWF 500x200x10x16/stiffener kg 1,185.00 Rp -
CUT OF R1A - IWF 600x200x11x17/stiffener kg 237.00 Rp -
CUT OF R2 - IWF 300x150x6.5x9/stiffener kg 192.56 Rp -
CUT OF R3 - IWF 350x175x7x11/stiffener kg 207.37 Rp -
CUT OF R4 - IWF 400x200x8x13/stiffener kg 39.50 Rp -
15 Plat besi tebal 12 mm

SC7 - IWF 350x175x7x11/Top & sambungan kg 2,601.72 Rp -


SC4 - IWF 400x200x8x13/sambungan kg 588.36 Rp -
SB1A - HC 882x300x12x20/sambungan kg 622.97 Rp -
SB3 - H 200 X 200 X 8 X 12 @Spoor kg 3,009.51 Rp -
SB5 - H 150x150x7x10 kg 2,204.77 Rp -
SB5A - PIPA Ø4" (114,3mm, t = 4,5mm) kg 1,918.56 Rp -
BR2 - H 200 X 200 X 8 X 12 @Bracing kg 1,023.23 Rp -
R1A - IWF 600x200x11x17/sambungan kg 4,297.59 Rp -
Truss Type 1 kg 11,841.25 Rp -
Truss Type 2 kg 726.88 Rp -
Truss Type 3 kg 771.26 Rp -
16 Plat besi tebal 10 mm

SC4 - IWF 400x200x8x13/sambungan kg 281.56 Rp -


SC7 - IWF 350x175x7x11/sambungan kg 745.31 Rp -
SB1A - HC 882x300x12x20/sambungan kg 604.89 Rp -
15 Plat besi tebal 8 mm
SC1 - IWF 600x300x12x20 kg 232.68 Rp -
SC2 - IWF 600x200x11x17 kg 474.03 Rp -
SC3 - IWF 500x200x10x16 kg 152.27 Rp -
SC4 - IWF 400x200x8x13 kg 206.52 Rp -
SC5 - H 400x400x13x21 kg 474.16 Rp -
SC6 - H 350x350x12x19 kg 835.24 Rp -
SC7 - IWF 350x175x7x11 kg 545.38 Rp -
SB1-HC 750 X 300 X 11,9 X 12 kg 45.23 Rp -
SB1A - HC 882x300x12x20 kg 15.08 Rp -
SB2-HC 750 X 300 X 11,9 X 12 kg 135.69 Rp -
R1 - IWF 500x200x10x16 kg 286.46 Rp -
R1A - IWF 600x200x11x17 kg 85.43 Rp -
R2 - IWF 300x150x6.5x9 kg 32.67 Rp -
R3 - IWF 350x175x7x11 kg 32.67 Rp -
R4 - IWF 400x200x8x13 kg 5.03 Rp -
16 Plat besi tebal 6 mm

P1 - PURLIN - CNP 150 x 65 x 20 x 3.2 kg 13,326.53 Rp -


P1 - PURLIN - CNP 150 x 65 x 20 x 3.2 @Kanopi kg 5,288.29 Rp -
G1 - C 150x65x20x3,2 @Kerangka cladding kg 6,043.48 Rp -
17 Plat besi tebal 5 mm

BR1 - Ø 19 MM kg 121.92 Rp -
Turn Buckle ROD Ø 22 mm kg 107.43 Rp -
112,711.77 Rp -
MUR BAUT ANGKUR

18 Mur Baut M 24

R1A - IWF 600x200x11x17/sambungan Bh 708.00 Rp -


19 Mur Baut M 22

SB1-HC 750 X 300 X 11,9 X 12 Bh 864.00 Rp -


SB1A - HC 882x300x12x20 Bh 336.00 Rp -
R1 - IWF 500x200x10x16/tanpa kolom Bh 1,280.00 Rp -
R1A - IWF 600x200x11x17 Bh 1,384.00 Rp -
R4 - IWF 400x200x8x13 Bh 144.00 Rp -
20 Mur Baut M 20

SC4 - IWF 400x200x8x13/sambungan Bh 408.00 Rp -


SC7 - IWF 350x175x7x11/sambungan Bh 1,752.00 Rp -
SB1A - HC 882x300x12x20/sambungan Bh 288.00 Rp -
SB5 - H 150x150x7x10 Bh 6,312.00 Rp -
SB5A - PIPA Ø4" (114,3mm, t = 4,5mm) Bh 4,080.00 Rp -
BR2 - H 175X175X7,5X11 @Bracing Bh 1,152.00 Rp -
R1 - IWF 500x200x10x16 Bh 3,624.00 Rp -
21 Mur Baut M 16

SC7 - IWF 350x175x7x11 /Top&sambungan Bh 1,578.00 Rp -


SC4 - IWF 400x200x8x13/sambungan Bh 306.00 Rp -
SB1A - HC 882x300x12x20/sambungan Bh 288.00 Rp -
R1A - IWF 600x200x11x17/sambungan Bh 2,688.00 Rp -
R2 - IWF 300x150x6.5x9 Bh 468.00 Rp -
R3 - IWF 350x175x7x11 Bh 468.00 Rp -
Truss Type 1 Bh 4,148.00 Rp -
Truss Type 2 Bh 708.00 Rp -
Truss Type 3 Bh 826.00 Rp -
22 Mur Baut M 12

P1 - PURLIN - CNP 150 x 65 x 20 x 3.2 Bh 19,320.00 Rp -


P1 - PURLIN - CNP 150 x 65 x 20 x 3.2 @Kanopi Bh 2,408.00 Rp -
G1 - C 150x65x20x3,2 @Kerangka cladding Bh 5,712.00 Rp -
23 Angkur Baut M 30

SC5 - H 400x400x13x21 Bh 384.00 Rp -


24 Angkur Baut M 25

SC1 - IWF 600x300x12x20 Bh 160.00 Rp -


25 Angkur Baut M 24

SC2 - IWF 600x200x11x17 Bh 264.00 Rp -


SC3 - IWF 500x200x10x16 Bh 96.00 Rp -
SC6 - H 350x350x12x19 Bh 768.00 Rp -
26 Angkur Baut M 22

SC4 - IWF 400x200x8x13 Bh 150.00 Rp -


SC7 - IWF 350x175x7x11 Bh 462.00 Rp -

Rp -
27 (Cut off IWF)

(Cut off R1 - IWF 500x200x10x16) kg 3,054.46 Rp -


(Cut off R1A - IWF 600x200x11x17) kg 1,017.60 Rp -
(Cut off R2 - IWF 300x150x6.5x9) kg 238.55 Rp -
(Cut offR3 - IWF 350x175x7x11) + talang kg 332.07 Rp -
(Cut offR4 - IWF 400x200x8x13) kg 52.80 Rp -
4,695.48 Rp -
28 Pengecatan menie 1x ex. Nippon Paint/Kansai kg 1,749,414.08 Rp -
29 Pengecatan finish 2x ex. Nippon Paint/Kansai kg 1,749,414.08 Rp -
30 LOUVRE

CNP 125x50x20x2.3 kg 9,564.75 Rp -


Plat Besi Tebal 2 mm kg 28,473.72 Rp -
31 KAWAT NYAMUK LOUVRE BELAKANG

CNP 125x50x20x2.3 kg 7,925.08 Rp -


Stainless Steel SUS 304, L = 1.5 m, Tebal kawat = 0.6 mm m2 907.50 Rp -
Plat strip 4x40 kg 1,754.50 Rp -
Flashing antara frame kawat nyamuk & louvre m' 988.00 Rp -
47,718.04 Rp -

31 TANGGA MAINTENANCE Detail Gambar unit 2.00 Rp -


32 PINTU BESI KECIL Incl. Kusen+askeosris full set unit 28.00 Rp -
33 KANOPI PINTU BESI BELAKANG Detail Gambar unit 14.00 Rp -
34 RALLING TANGGA BETON BELAKANG Detail Gambar unit 14.00 Rp -

Sub Total B Rp -

JUMLAH A s/d B Rp -

PEMBULATAN Rp -
BILL OF QUANTITY
PEKERJAAN : POS JAGA @ 2 UNIT
LOKASI : BLOK O2
PROYEK MARUNDA CENTER

NO URAIAN PEKERJAAN UNIT QTY HARGA SAT. JUMLAH HARGA

I PEKERJAAN PERSIAPAN
Pengukuran & pematokan 1.00 ls Rp -
ABD, dokumentasi dan test CBR 1.00 ls Rp -
Mobilisasi - demobilisasi alat berat 1.00 ls Rp -
Air kerja dan listrik kerja 1.00 ls Rp -
Bedeng & gudang pekerja 1.00 ls Rp -
JUMLAH I Rp -
II PEKERJAAN TANAH
Galian tanah pondasi 4.98 m3 Rp -
Urugan kembali di padatkan 2.99 m3 Rp -
Buangan tanah galian 1.99 m3 Rp -
Urugan pasir di padatkan tebal 100 mm 2.21 m3 Rp -
Cerucuk Bambu 23.00 ttk Rp -
JUMLAH II Rp -
III PEKERJAAN BETON DAN METAL STRUKTURAL
Beton Struktural
Kolom Praktis 150 x 150 mm
-Beton K-225 0.93 m3 Rp -
-Besi 247.69 kg Rp -
-Bekisting 24.67 m2 Rp -
Sloof SF1 200x400 mm
-Beton K-225 2.28 m3 Rp -
-Besi 313.99 kg Rp -
-Bekisting 22.78 m2 Rp -
Balok B1 150x300 mm
-Beton K-225 0.86 m3 Rp -
-Besi 184.68 kg Rp -
-Bekisting 11.46 m2 Rp -
Slab S1 t = 150 mm
-Beton K-225 3.12 m3 Rp -
-Wiremesh M6 rangkap 4.17 lbr Rp -
-Bekisting 5.84 m2 Rp -
Dak Kanopi t = 100 mm
-Beton K-225 0.38 m3 Rp -
-Wiremesh M6 Single 0.38 lbr Rp -
-Bekisting 5.30 m2 Rp -
Metal Struktural
CNP 100x50x20x3.2 148.28 kg Rp -
Sambungan Plat, Mur, Baut, dll. 22.23 kg Rp -
JUMLAH III Rp -
IV PEKERJAAN NON-STRUKTURAL
Beton
Meja Beton t = 100 mm finish keramik 0.97 m2 Rp -
Kanopi Beton t = 100 mm 2.59 m2 Rp -
Pasangan
Plesteran 136.93 m2 Rp -
Acian 136.93 m2 Rp -
Acian Beton 58.16 m2 Rp -
Bata Ringan (AAC) 130 mm, termasuk kolom dan balok praktis 68.47 m2 Rp -
Dinding Roster 2.38 m2 Rp -
Lapisan Kedap Air
Waterproofing + Screed 100 mm 3.83 m2 Rp -
Waterproofing toilet 2.19 m2 Rp -
Penutup Atap, Talang Datar & Talang Tegak
Atap zincalume Trimdek 0,4 BMT 20.94 m2 Rp -
Talang metal 3.37 m Rp -
Listplank metal 1.01 m2 Rp -
Flashing 15.66 m Rp -
Pipa Air Hujan PVC ∅100 mm 5.23 m Rp -
Roof Drain 3” 2.00 unit Rp -
Pintu dan Jendela
Pintu tipe P1, ukuran 1000x2150 mm 2.00 unit Rp -
Pintu tipe P2, ukuran 780x2140 mm 1.00 unit Rp -
Jendela tipe J1, ukuran 1520x1450 mm 3.00 unit Rp -
Jendela tipe J2, ukuran 1620x1450 mm 1.00 unit Rp -
Penyelesaian
Lantai
Keramik 400 x 400 mm 11.54 m2 Rp -
Keramik 200 x 200 mm 1.85 m2 Rp -
Beton Finish Halus 5.84 m2 Rp -
Dinding
Dinding Keramik 200x200 mm 9.03 m2 Rp -
Plafon
Gypsum board 9 mm, termasuk rangka dan pengecatan 11.41 m2 Rp -
Kalsium silikat 6 mm, termasuk rangka dan pengecatan 7.17 m2 Rp -
Pengecatan
Cat Dinding Dalam 64.19 m2 Rp -
Cat Dinding Luar 54.93 m2 Rp -
Jalusi dan Ventilasi
Ventilasi tipe BV1, ukuran 780x480 mm 1.00 unit Rp -
JUMLAH IV Rp -
V ME, PLAMBING & SANITARY
Sistem Distribusi Daya
Panel
Instalasi Mcb Kabel Ex. Supreme & Box Mcb,+ Box mika 1.00 unit Rp -
Instalasi Stop Kontak 1 Phasa, + stop kontak 5.00 ttk Rp -
Sistem Penerangan
Perlengkapan Lampu
Down Light LED Bulb 7 w 3.00 bh Rp -
Down Light LED Bulb 13 w 3.00 bh Rp -
Saklar
Saklar Tunggal 10 A, 1 phasa 3.00 bh Rp -
Saklar Ganda 10 A, 1 phasa 1.00 bh Rp -
Kabel
Instalasi Penerangan 6.00 ttk Rp -

Sistem Air Bersih


Pemipaan
Pipa PVC AW, termasuk fitting, support & aksesoris 3.00 m Rp -
- dia. 20 mm
Sistem Air Buangan
Piping
Pipa Air Kotor
Pipa PVC 10 kg/cm2, termasuk galian, urugan, pemadatan, fitting & aksesoris 5.00 m Rp -
- dia. 100 mm
Pipa Air Bekas
Pipa PVC 10 kg/cm2, termasuk galian, urugan, pemadatan, fitting & aksesoris 4.00 m Rp -
- dia. 50 mm

Perlengkapan Plambing
Kloset Jongkok 1.00 unit Rp -
Kran dinding 1.00 bh Rp -
Floor Drain 1.00 bh Rp -
Pasang Septic Tank 1000 Lt, / 1 m3+resapan 1.00 unit Rp -
Pasang Ground Tank 1000 Lt, / 1 m3+pelampung otomatis 1.00 unit Rp -
Balvave 3/4 Onda 1.00 bh Rp -
JUMLAH V Rp -
JUMLAH I s/d V Rp -
JUMLAH 2 UNIT -
PEMBULATAN -
BILL OF QUANTITY
PEKERJAAN : MUSHOLA, SHELTER, TOILET @2 UNIT
LOKASI : BLOK O2
PROYEK MARUNDA CENTER

NO URAIAN PEKERJAAN UNIT QTY HARGA SAT. JUMLAH HARGA

I PEKERJAAN PERSIAPAN
1 Pengukuran & pematokan 1.00 ls Rp -
2 ABD, dokumentasi dan test CBR 1.00 ls Rp -
3 Mobilisasi - demobilisasi alat berat 1.00 ls Rp -
4 Air kerja dan listrik kerja 1.00 ls Rp -
5 Bedeng & gudang pekerja 1.00 ls Rp -
JUMLAH I Rp -
II PEKERJAAN TANAH
Galian Tanah pondasi 5.95 m3 Rp -
Urugan kembali di padatkan 3.57 m3 Rp -
Buangan tanah galian 2.38 m3 Rp -
Urugan Pasir di padatkan tebal 100 mm 4.66 m3 Rp -
Cerucuk Bambu 47.00 ttk Rp -
JUMLAH II Rp -
III PEKERJAAN BETON DAN METAL STRUKTURAL
Beton Struktural
Kolom Utama 300 x 300 mm
-Beton K-225 2.36 m3 Rp -
-Besi 229.48 kg Rp -
-Bekisting 31.51 m2 Rp -
Kolom Praktis 150 x 150 mm
-Beton K-225 0.70 m3 Rp -
-Besi 188.52 kg Rp -
-Bekisting 18.78 m2 Rp -
Sloof SF1 200x400 mm
-Beton K-225 3.81 m3 Rp -
-Besi 524.87 kg Rp -
-Bekisting 38.08 m2 Rp -
Balok RB 150x300 mm
-Beton K-225 0.66 m3 Rp -
-Besi 142.14 kg Rp -
-Bekisting 8.82 m2 Rp -
Balok RB 150x200 mm
-Beton K-225 0.74 m3 Rp -
-Besi 158.99 kg Rp -
-Bekisting 9.82 m2 Rp -
Balok RB 150x150 mm
-Beton K-225 0.24 m3 Rp -
-Besi 62.95 kg Rp -
-Bekisting 3.14 m2 Rp -
Slab S1 t = 150 mm
-Beton K-225 5.07 m3 Rp -
-Wiremesh M6 rangkap 6.76 lbr Rp -
-Bekisting 4.88 m2 Rp -
Dak Kanopi t = 100 mm
-Beton K-225 0.53 m3 Rp -
-Wiremesh M6 single 0.53 lbr Rp -
-Bekisting 7.06 m2 Rp -
Atap Beton t = 100 mm
-Beton K-225 2.71 m3 Rp -
-Wiremesh M6 rangkap 5.03 lbr Rp -
-Bekisting 29.17 m2 Rp -
Metal Struktural
CNP 100x50x20x2.3 186.74 kg Rp -
Sambungan Plat, Mur, Baut, dll. 28.00 kg Rp -
JUMLAH III Rp -
IV PEKERJAAN NON-STRUKTURAL
Beton
Meja Beton t = 100 mm finish keramik 1.97 m2 Rp -
Pasangan
Plesteran 306.79 m2 Rp -
Acian 306.79 m2 Rp -
Acian Beton 43.08 m2 Rp -
Bata Ringan (AAC) 130 mm, termasuk kolom dan balok praktis 145.51 m2 Rp -
Dinding Roster 7.92 m2 Rp -
Glass block 1.76 m2 Rp -
Metal Arsitektural
Pipa Ø1,5" & CNP 125, panjang 1700 mm 1.00 unit Rp -
Lapisan Kedap Air
Waterproofing + Screed 100 mm 25.15 m2 Rp -
Waterproofing toilet 5.08 m2 Rp -
Penutup Atap, Talang Datar & Talang Tegak
Atap zincalume Trimdek 0,40 BMT 28.85 m2 Rp -
Talang Metal 3.35 m Rp -
Listplank metal 0.67 m2 Rp -
Flashing m Rp -
Pipa Air Hujan PVC Ø100 mm 6.49 m Rp -
Roof Drain Ø100 mm 4.00 bh Rp -
Pintu dan Jendela
Pintu tipe P2, ukuran 780x2140 mm 2.00 unit Rp -
Penyelesaian
Lantai
Keramik 400 x 400 mm 12.46 m2 Rp -
Keramik 200 x 200 mm 7.41 m2 Rp -
Beton Finish Halus 21.18 m2 Rp -
Dinding
Dinding Keramik 200x200 mm 33.48 m2 Rp -
Plafon
Gypsum board 9 mm, termasuk rangka dan pengecatan 12.46 m2 Rp -
Kalsium silikat 6 mm, termasuk rangka dan pengecatan 7.41 m2 Rp -
Beton Ekspos 21.18 m2 Rp -
Tali Air 31.04 m Rp -
Pengecatan
Cat Dinding Dalam 74.56 m2 Rp -
Cat Dinding Luar 117.69 m2 Rp -
Jalusi dan Ventilasi
Ventilasi tipe BV1, ukuran 780x480 mm 3.00 unit Rp -
JUMLAH IV Rp -
V ME, PLAMBING & SANITARY
Sistem Plumbing
Sistem Air Bersih
Pemipaan
Pipa PVC AW, termasuk fitting, support & aksesoris
- dia. 20 mm 16.00 m' Rp -
- dia. 25 mm 11.00 m' Rp -
Sistem Air Buangan
Piping
Pipa Air Kotor
Pipa PVC 10 kg/cm2, termasuk galian, urugan, pemadatan, fitting & aksesoris 15.00 m' Rp -
- dia. 100 mm
Pipa Air Bekas
Pipa PVC 10 kg/cm2, termasuk galian, urugan, pemadatan, fitting & aksesoris 16.00 m' Rp -
- dia. 50 mm
Perlengkapan Plambing
Kloset Jongkok 2.00 unit Rp -
Kran dinding 4.00 bh Rp -
Floor Drain 3.00 bh Rp -
Pasang Septic Tank 1000 Lt, / 1 m3+resapan 1.00 unit Rp -
Pasang Ground Tank 1000 Lt, / 1 m3+pelampung otomatis 1.00 unit Rp -
Balvave 3/4 Onda 1.00 bh Rp -
MUSHOLA & TOILET
PEKERJAAN ELEKTRIKAL
Sistem Distribusi Daya
Panel
Instalasi Mcb Kabel Ex. Supreme & Box Mcb,+ Box mika 1.00 unit Rp -
Instalasi Stop Kontak 1 Phasa, + stop kontak 6.00 ttk Rp -
Sistem Penerangan
Perlengkapan Lampu
Down Light LED Bulb 7 w 4.00 bh Rp -
Down Light LED Bulb 13 w 4.00 bh Rp -
Saklar
Saklar Tunggal 10 A, 1 phasa 2.00 bh Rp -
Saklar Ganda 10 A, 1 phasa 2.00 bh Rp -
Kabel
Instalasi Penerangan 8.00 ttk Rp -

SHELTER
PEKERJAAN ELEKTRIKAL
Sistem Distribusi Daya
Kabel
Instalasi Stop Kontak 1 Phasa, + stop kontak 1.00 ttk Rp -
Sistem Penerangan
Perlengkapan Lampu
LED 1 x 18 w, Dust Proof 2.00 bh Rp -
Saklar
Saklar Tunggal 10 A, 1 phasa 1.00 bh Rp -
Kabel
Instalasi Penerangan 2.00 ttk Rp -
JUMLAH V Rp -
JUMLAH I s/d V Rp -
JUMLAH 2 UNIT Rp -
PEMBULATAN Rp -
BILL OF QUANTITY
PEKERJAAN : SHELTER @ 3 UNIT
LOKASI : BLOK O2
PROYEK MARUNDA CENTER

NO URAIAN PEKERJAAN UNIT QTY HARGA SAT. JUMLAH HARGA

I PEKERJAAN PERSIAPAN
1 Pengukuran & pematokan 1.00 ls -
2 ABD, dokumentasi dan test CBR 1.00 ls -
3 Mobilisasi - demobilisasi alat berat 1.00 ls -
4 Air kerja dan listrik kerja 1.00 ls -
5 Bedeng & gudang pekerja 1.00 ls -
JUMLAH I -
II PEKERJAAN TANAH
Galian + Buang Tanah 3.32 m3 Rp -
Pemadatan Tanah 8.31 m2 Rp -
Cerucuk Bambu 12.00 ttk Rp -
Urugan Pasir 100 mm 0.83 m3 Rp -
Pemadatan Pasir 8.31 m2 Rp -
JUMLAH II Rp -
III PEKERJAAN BETON DAN METAL STRUKTURAL
Beton Struktural
1 Kolom K1
-Beton K-225 0.43 m3 Rp -
-Besi D13 13.73 kg Rp -
-Besi ∅10 13.68 kg Rp -
-Bekisting 8.69 m2 Rp -
2 Kolom Praktis 150 x 150 mm
-Beton K-225 (sitemix) 0.05 m3 Rp -
-Besi D13 9.15 kg Rp -
-Besi ∅10 2.90 kg Rp -
-Bekisting 1.23 m2 Rp -
Sloof SF1 200x400 mm
-Beton K-225 1.03 m3 Rp -
-Besi D13 88.07 kg Rp -
-Besi ∅10 46.44 kg Rp -
-Bekisting 10.26 m2 Rp -
Balok RB1 150x300 mm
-Beton K-225 0.58 m3 Rp -
-Besi D13 88.07 kg Rp -
-Besi ∅10 46.44 kg Rp -
-Bekisting 7.70 m2 Rp -
Slab S1 t = 150 mm
-Beton K-225 0.86 m3 Rp -
-Wiremesh M6 1.15 lbr Rp -
-Bekisting 1.80 m2 Rp -
Metal Struktural
Besi siku 60x60x5 369.32 kg Rp -
CNP 100x50x20x2.3 101.27 kg Rp -
Sambungan Plat, Mur, Baut, dll. 70.55 kg Rp -
JUMLAH III Rp -
IV PEKERJAAN NON-STRUKTURAL
Beton
Meja Beton t = 100 mm finish keramik 1.56 m2 Rp -
Pasangan
Plesteran 28.61 m2 Rp -
Acian 28.61 m2 Rp -
Acian Beton 8.73 m2 Rp -
Bata Ringan (AAC) 130 mm, termasuk kolom dan balok praktis 9.74 m2 Rp -
Dinding Roster 4.56 m2 Rp -
Metal Arsitektural
Pipa ∅1.5” & CNP 125, panjang 1200 mm 1.00 unit Rp -
Penutup Atap, Talang Datar & Talang Tegak
Atap zincalume Trimdek 0,4 BMT 15.56 m2 Rp -
Talang FRP 1,5 mm 6.23 m Rp -
Listplank metal 8.26 m2 Rp -
Pipa Air Hujan PVC ∅100 mm 5.67 m Rp -
Roof Drain 3” 2.00 bh Rp -
Finishing
Beton Finish Halus 5.74 m2 Rp -
Cat Dinding Luar 28.61 m2 Rp -
JUMLAH IV Rp -
V PEKERJAAN ELEKTRIKAL
Sistem Distribusi Daya
Kabel
Instalasi Stop Kontak 1 Phasa, + stop kontak 1.00 ttk Rp -
Sistem Penerangan
Perlengkapan Lampu
LED 1 x 18 w, Dust Proof 2.00 bh Rp -
Saklar
Saklar Tunggal 10 A, 1 phasa 1.00 bh Rp -
Kabel
Instalasi Penerangan 2.00 ttk Rp -
JUMLAH V Rp -
JUMLAH I s/d V -
JUMLAH 3 UNIT -
PEMBULATAN -
MARUNDA CENTER
REKAP PEKERJAAN
GUDANG SEWA BLOK O2
NO URAIAN PEKERJAAN QTY UNIT

A PEKERJAAN GUDANG (CIVIL WORK) 1.00


ls

B PEKERJAAN PARKIR (INFRA) 1.00


ls

C PEKERJAAN ATAP (ATAP & DINDING CLAD) 1.00


ls

D PEKERJAAN BAJA (METAL STR) 1.00


ls

E BANGUNAN PENUNJANG 1.00


ls

TOTAL
JUMLAH

Rp -

Rp -
Rp -

Rp -

Rp -

Rp -

Anda mungkin juga menyukai