KOP PERUSAHAAN

REKAPITULASI
RENCANA ANGGARAN BIAYA (RAB)

Pekerjaan : Pembangunan SPAM Regional Burana Titab


Lokasi : Kabupaten Buleleng
Tahun : 2020

JUMLAH
NO URAIAN PEKER JAAN
( Rp )

A PEKERJAAN PERSIAPAN DAN UMUM ###


###
B PEKERJAAN PENYEMPURNAAN RESERVOAR DISTRIBUSI LOKAPAKSA ###
###
C PEKERJAAN PIPA DARI RESV. LOKAPAKSA SAMPAI JALAN NASIONAL ( - 390 M) ###

PENYEMPURNAAN JALUR DISTRIBUSI BAGI PELAYANAN DARI DESA UNGGAHAN - TELAGA -


D ###
ULARAN DAN DESA TITAB
###
E PEKERJAAN DARI JALAN NASIONAL (-400 M) MENUJU RESERVOAR PANGKUNG PARUK

F PEKERJAAN RESERVOIR PANGKUNG PARUK

G PEKERJAAN PENGADAAN DAN PEMASANGAN POMPA DI RESERVOAR INDUK IPA ATAS

H SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA (SMK3)

JUMLAH ###

Terbilang : ###
###
###

.........., ............... 2020


 
PT/CV
   

....................
Direktur/direktris
DAFTAR KUANTITAS DAN HARGA

HARGA SATUAN PAJAK TOTAL


NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) % Rp. ( Rp )
1 2 3 4 5.00 6 7.00
A PEKERJAAN PERSIAPAN DAN UMUM
A1 PERSIAPAN DAN PEKERJAAN SEMENTARA

1.Mobilisasi semua alat berat, mesin - mesin, peralatan dan tenaga ahli yang
Unit 1.000 10
diperlukan untuk pelaksanaan pekerjaan

2. Bangunan kantor kontraktor, workshop, gudang, tempat tinggal staf dan tenaga
kerja, serta fasilitas/bangunan lainnya termasuk furniture, penerangan, AC dan Unit 1.000 10
tempat parkir yang diperlukan untuk pelaksanaan pekerjaan.
3. Papan nama proyek bh 1.000 10
A2 SURVEY DAN PENYELIDIKAN BAWAH TANAH
1. Pengukuran dan Pematokan mtr 1,492.000 10
2. Test pit ttk 3.000 10
3. Penyediaan lokasi pembuangan hasil galian ls 1.000 10
4. Pembersihan semua fasilitas sementara, Pemindahan mesin/peralatan, material
ls 1.000 10
sisa dan sebagainya
A3 UMUM PERKERASAN DAN PENGASPALAN
1. Relokasi Utilitas dan Pelayanan yang Ada ( TELKOM, PDAM, PLN, dll ) Ls 1.00 10

JUMLAH A
B PEKERJAAN PENYEMPURNAAN RESERVOAR DISTRIBUSI LOKAPAKSA
B.1 PEKERJAAN PAGAR
1. Pekerjaan Pemasangan Dinding Bata Merah Campuran 1 SP : 5 PP m2 85.320 10
2. Pekerjaan Plesteran 1 SP : 2 PP tebal 15 mm m2 759.240 10
3. Pek. Pas. Paving Block 20 x 20 cm tebal 6 cm K225, (+ urugan pasir = 5 cm) m2 90.000 10
4. Pekerjaan dan Pemasangan Pintu Railling M' 1.500 10
5. Pekerjaan Pasangan Ralling (Hollow Galvanis) (Sesuai Disian) m' 9.000 10
JUMLAH B1
B.2 PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
a. Pengadaan Pemasangan Elektrikal dan Aksesories
1. Lampu PJU LED 50W bh 8.000 10
2. Double Switch 10 A/ 220V plano bh 2.000 10
3. Kabel NYFGBY 2x2,5mm m 76.800 10
4. Pek. Pemasangan Tiang Lampu Jalan Single bh 2.000 10
5. Pek. Pemasangan Tiang Lampu Jalan Double bh 3.000 10

b. Pengadaan Listrik
1. Pengadaan Listrik 2.200 ls 1.000 10
JUMLAH B2
B.3 PEKERJAAN BANGUNAN POS JAGA
a Pekerjaan Tanah
1. Urugan Tanah Kembali dengan Pemadatan m3 10.080 10
2. Urugan Pasir t = 5 cm m3 1.020 10
HARGA SATUAN PAJAK TOTAL
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) % Rp. ( Rp )
1 2 3 4 5.00 6 7.00
b Pekerjaan Beton
1. Lantai Kerja K - 125
- Cor Beton K-125 m3 0.870 10
2. Pekerjaan Ring Balok
- Beton Cor K-175 m3 0.350 10
- besi Beton Kg 62.040 10
- Begesting 2 X pakai m2 4.560 10
3. Pekerjaan Meja Beton
- Beton Cor K-175 m3 0.120 10
- besi Beton Kg 19.850 10
- Begesting 2 X pakai m2 1.860 10

c Pekerjaan Pasangan dan Pelapis


1. Pekerjaan Pasangan Batako Camp 1:5 m2 23.250 10
2. Pekerjaan Plesteran 1 PC : 5 PS m2 23.250 10
3. Pekerjaan Acian m2 23.250 10
4. Pekerjaan Cat Dinding m2 23.250 10
5. Pek. Pas. Keramik Dinidng (Luar) m2 31.470 10

d Pekerjaan Atap
1. Pekerjaan Rangka Kuda-Kuda Kayu Kamper m3 0.370 10
2. Pekerjaan Usuk Reng Kayu Kamper m2 30.020 10
3. Pekerjaan Pasangan Atap Genteng m2 30.020 10
4. Pekerjaan Pas Bubungan Genteng m' 13.800 10
5. Pekerjaan Pas. Ikut Celedu unit 4.000 10
6. Pekerjaan Pas. Murda unit 2.000 10
7. Pekerjaan Listplank Kayu Kelas I/kamper 2/20cm m' 19.760 10
8. Pekerjaan Pas. Tatab Kayu Kamper m' 19.760 10
9. Pek. Polituran Listplank m2 5.920 10

e Pekerjaan Langit-Langit
1. Pas. Plafond Kasiboard Rangka Hollow m3 26.760 10
2. Pas. List Gypsum m' 36.200 10
3. Pek. Cat Plafond m2 26.760 10

f Pekerjaan Penutup Lantai


1. Pas.Keramik 30 x 30 cm m2 15.670 10
2. Pas. Keramik 20x30 cm m2 1.820 10
3. Pas. Keramik Dinding 20 x 25 cm m2 9.200 10
4. Pas. Stepnozing (Plin Keramik) m' 4.600 10
HARGA SATUAN PAJAK TOTAL
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) % Rp. ( Rp )
1 2 3 4 5.00 6 7.00
g Pekerjaan Kusen Pintu dan Jendela
1. Pas. Daun Pintu Kayu Kamper m2 4.970 10
2. Pas. Jendela Kaca m2 2.960 10
3. Pas. Kaca Bening t = 5 mm m2 0.810 10
4. Pas. Engsel Pintu set 3.000 10
5. Pas. Grendel Pintu unit 3.000 10
6. Pas. Handle & Kunci Pintu bh 3.000 10
7. Pas. Engsel Jendela set 4.000 10
8. Pas. Grendel Jendela unit 4.000 10
9. Pas. Kait Angin unit 4.000 10
10. Pek. Polituran m2 19.920 10

h Pekerjaan Toilet
1. Instalasi Plumbing Air Bersih m 15.000 10
2. Instalasi Plumbing Air Kotor m 8.000 10
3. Closet duduk bh 1.000 10
4. Pasang Washtafel set 1.000 10
5. Pasang Floor Drain set 1.000 10
6. Pasang Kran air set 2.000 10
7. Pekerjaan Septiktank unit 1.000 10
8. Pekerjaan Peresapan
- Galian Tanah m3 1.960 10
- Buis Beton (uk. Dalam 80 cm) bh 5.000 10
- Plat Penutup Beton K 175 m3 0.070 10
- Koral m3 0.120 10
- Pasir Urug m3 0.100 10

JUMLAH B3
JUMLAH B
C PEKERJAAN PIPA DARI RESV. LOKAPAKSA SAMPAI JALAN NASIONAL ( - 390 M)
C1 PEKERJAAN OPEN TRENCH DGN CLEAN CONSTRUCTION
Pekerjaan Tanah Pada Pipa dia OD 457 mm
1. Eksisting Unpavement m' 636.000 10
2. Eksisting Hot Mix m' 1,312.000 10
JUMLAH C1

C2 PEKERJAAN PERKERASAN /PENGASPALAN


1. Lapis Resap Pengikat - Aspal Cair liter 2,279.160 10
2. Lapis Perekat - Aspal Cair liter 873.900 10
3. Laston Lapis Aus (AC-WC) (gradasi halus/kasar) ton 153.810 10

JUMLAH C2
HARGA SATUAN PAJAK TOTAL
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) % Rp. ( Rp )
1 2 3 4 5.00 6 7.00

C3 PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA DAN ACCESSORIES


1. Pipa GIP dia OD 457,2 mm, tebal 9,5 mm m 1,492.000 10
2. Pipa Penguras Pipa GIP dia.OD 273 mm,tebal 6,4 m 66.000 10
3. Bend 90° Pipa GIP dia OD 457,2 mm,tebal 9,5 mm bh 1.000 10
4. Bend 45° Pipa GIP dia OD 457,2 mm,tebal 9,5 mm bh 20.000 10
5. Bend 22,5° Pipa GIP dia OD 457,2 mm,tebal 9,5 mm bh 13.000 10

6. Bend 90° GIP dia OD 273,tebal 6,4 mm (Penguras) bh 4.000 10


7. Tee dia OD 457 x 273 mm bh 2.000 10
8. AF Gate Valve PN 16 dia. 18'' bh 3.000 10
9. AF Gate Valve PN 16 dia. 10'' bh 3.000 10
10. Dismantling Joint dia. 18'' bh 3.000 10
11. Dismantling Joint dia. 10'' bh 3.000 10
12. Flange Las dia. 18'' bh 6.000 10
13. Flange Las dia. 10'' bh 6.000 10
14. Karet Packing dia 18'' bh 13.000 10
15. Karet Packing dia 10'' bh 3.000 10
16. Bout Mour 3/4"x4" bh 96.000 10
17. Air Valve dia 2'' bh 1.000 10
18. Floating Valve
- Modulating Floating Valve dia 18" PN 16 bh 1.000 10
- Y Strainer dia 18" PN 16 bh 1.000 10
- Universal Flange Adaptor dia 18" PN 16 bh 2.000 10
- Gate Valve Resilent Seat dia 18" PN 16 bh 1.000 10
- Baut bh 90.000 10
- Flange Las dia. 18'' bh 2.000 10
- Karet Packing 18" bh 2.000 10

JUMLAH C3

C4 PEKERJAAN PENYAMBUNGAN (PENGELASAN)


1 1. Penyambungan Pipa GIP dan Accessories cm 129,061.160 10
JUMLAH C4
C5 PEKERJAAN PENGETESAN PIPA DAN ACCESSORIES
1 1. Pipa GIP dia OD 457,2 mm, tebal 9,5 mm m 3,442.000 10
JUMLAH C5
C6 PEKERJAAN FLUSHING PIPA DAN ACCESSORIES
1 1. Pipa GIP dia OD 457,2 mm, tebal 9,5 mm m 3,442.000 10
JUMLAH C6
HARGA SATUAN PAJAK TOTAL
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) % Rp. ( Rp )
1 2 3 4 5.00 6 7.00
C7 PEKERJAAN BANGUNAN PELENGKAP
1 1. Box Gate Valve Pipa OD 457,2 mm unit 6.000
Uraian pekerjaan per 1 unit bangunan :
- Galian Tanah Biasa m3 5.190 10
- Urugan Pasir m3 0.110 10
- Pekerjaan Plesteran 1 : 2 m2 16.900 10
- Pekerjaan Acian 1 : 2 m2 16.900 10
- Beton K125 m3 0.110 10
- Beton K225 m3 1.700 10
- Baja Tulangan kg 472.420 10
- Begisting m2 12.940 10

2 2. Jembatan Unit 1.000


Jembatan Pipa, Panjang = 6 m' sta 5+465
Uraian pekerjaan per 1 unit bangunan :
- Galian Tanah berbatu m3 7.100 10
- Galian tanah biasa m3 16.580 10
- Urugan tanah kembali dipadatkan m3 8.250 10
- Urugan Pasir m3 0.370 10
- Beton Rabat (Camp 1:3:5) m3 0.450
- Beton K225 m3 16.010 10
- Baja Frofil dengan Pengelasan kg 926.400 10
- Plat Andas dan Plat Sambung kg 105.980 10
- Pelat buhul / pengaku kg 88.080 10
- Stiffener kg 36.930 10
- Baja Tulangan kg 2,590.300 10
- Begesting Batako m2 9.600 10
- Begisting m2 40.540 10
- Baut 3/4" bh 32.000 10
- Pelat Klem pipa bh 8.000 10
- Besi dia 20 mm kg 36.250 10
- Cat Jembatan + Pipa m2 27.790 10

JUMLAH C7
HARGA SATUAN PAJAK TOTAL
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) % Rp. ( Rp )
1 2 3 4 5.00 6 7.00
C8 PEKERJAAN LAIN LAIN
- Pasangan Batu Kali Camp. 1smn : 4 psr m³ 202.440 10
- Beton K125 m³ 35.510 10
- Beton K 175 m³ 19.440 10
- Begesting 2x Pakai Trush Block m2 86.400 10
- Pembesian Trush Block kg 1,958.600 10
- Pembuatan dan Pemasangan Pelindung Air valve Bh 1.000 10
- Pembuatan dan Pemasangan Beton KS Bh 6.000 10
'- Pembuatan dan Pemasangan patok Ujung pipa Bh 1.000 10
- Pembersihan Akhir Ls 1.000 10
JUMLAH C8
JUMLAH C
DAFTAR KUANTITAS DAN HARGA

HARGA SATUAN PAJAK TOTAL


NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) % Rp. ( Rp )
1 2 3 4.00 5.00 6 7.00
D PENYEMPURNAAN JALUR DISTRIBUSI BAGI PELAYANAN DARI DESA UNGGAHAN - TELAGA - ULARAN DAN DESA TITAB
I Pekerjaan Persiapan
1. Pengukuran dan Pematokan mtr 280.00 10
JUMLAH - I
II Pekerjaan Tanah dan Pengembalian Kondisi
1. Pek. Memotong Aspal m' 584.00 10
2. Pek. Galian Tanah Biasa m3 77.09 10
3. Pek. Galian Tanah Keras m3 51.39 10
4. Pek. Urugan Tanah Kembali m3 24.72 10
5. Pek. Pemadatan Tanah m3 757.60 10
6. Pek. Urugan Pasir m3 34.90 10
7. Pek. Buangan Tanah m3 2,659.00 10
8. Pek. Urugan Agregat A m3 1,242.40 10
9. Pek. Beton K175 m3 241.71 10
JUMLAH - II
III Pekerjaan Perkerasan / Pengaspalan
1. Lapis Resap Pengikat - Aspal Cair liter 145.60 10
2. Lapis Perekat - Aspal Cair liter 56.00 10
3. Laston Lapis Aus (AC-WC) (gradasi halus/kasar) ton 9.86 10

JUMLAH - III
IV Pekerjaan Pengadaan dan Pemasangan Pipa dan Accessories
1. Pipa GIP OD 165.1 mm,tebal 5 mm m 160.00 10
2. Pipa GIP OD 114.3 mm,tebal = 4,5 mm m 102.00 10
3. Pipa GIP OD 88,9 mm, tebal 4 mm m 18.00 10
4. Pipa GIP OD 60.3 mm,tebal = 3.6 m m 12.00 10
5. Bend 22,5° Pipa GIP OD 165,1 mm, tebal 5 mm bh 2.00 10
6. Bend 45° Pipa GIP OD 165,1 mm, tebal 5 mm bh 2.00 10
7. Bend 22,5° Pipa GIP OD 114.3 mm t = 4.5 mm bh 2.00 10
8. Bend 45° Pipa GIP OD 114.3 mm t = 4.5 mm bh 5.00 10
9. Bend 22,5° Pipa GIP OD 114.3 mm,tebal = 4,5 mm bh 3.00 10
10. Bend 90° Pipa GIP OD 114.3 mm t = 4 mm bh 1.00 10
11. Tee GIP All Flange dia 6'' bh 3.00 10
12. Tee GIP All Flange dia 4'' bh 9.00 10
HARGA SATUAN PAJAK TOTAL
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) % Rp. ( Rp )
1 2 3 4.00 5.00 6 7.00
13. Tee GIP All Flange dia 3'' bh 3.00 10
14. Reducer GIP dia 6'' x 4'' bh 2.00 10
15. AF Gate Valve PN 16 dia. 6'' bh 2.00 10
16. AF Gate Valve PN 16 dia. 4'' bh 5.00 10
17. AF Gate Valve PN 16 dia. 3'' bh 4.00 10
18. AF Gate Valve PN 16 dia. 2'' bh 1.00 10
19. Watermeter dia 3'' bh 2.00 10
20. Reducer AF dia 2'' x 3'' bh 1.00 10
21. Karet Packing dia 6'' bh 4.00 10
22. Karet Packing dia 4'' bh 10.00 10
23. Karet Packing dia 3'' bh 6.00 10
24. Bout Mour 3/4"x4" bh 80.00 10
25. Air Valve dia 1'' bh 1.00 10
26. Floating Valve unit 1.00
- Modulating Floating Valve dia 3" PN 16 bh 1.00 10
- Y Strainer dia 3" PN 16 bh 1.00 10
- Universal Flange Adaptor dia 3" PN 16 bh 3.00 10
- Gate Valve Resilent Seat dia 3" PN 16 bh 3.00 10
- Watermeter Mekanikal + data logger bh 1.00 10
- Baut bh 48.00 10
- Flange Las dia. 3'' bh 3.00 10
- Karet Packing 3" bh 6.00 10

JUMLAH - IV
V Pekerjaan Penymbungan (Pengelasan)
1. Penyambungan Pipa GIP dan Accessories cm 2,926.69 10
JUMLAH - V
VI Pekerjaan Pengetesan Pipa dan Accessories
1. Pipa GIP OD 165.1 mm,tebal 5 mm m 1,272.00 10
2. Pipa GIP OD 114.3 mm,tebal = 4,5 mm m 3,302.00 10
3. Pipa GIP OD 88,9 mm, tebal 4 mm m 1,535.00 10
4. Pipa GIP OD 60.3 mm,tebal = 3.6 m m 1,656.00 10
JUMLAH - VI
VII Pekerjaan Flushing Pipa dan Accessories
1. Pipa GIP OD 165.1 mm,tebal 5 mm m 1,272.00 10
2. Pipa GIP OD 114.3 mm,tebal = 4,5 mm m 3,302.00 10
3. Pipa GIP OD 88,9 mm, tebal 4 mm m 1,535.00 10
4. Pipa GIP OD 60.3 mm,tebal = 3.6 m m 1,656.00 10
JUMLAH - VII
HARGA SATUAN PAJAK TOTAL
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) % Rp. ( Rp )
1 2 3 4.00 5.00 6 7.00
VIII Pekerjaan Bangunan Pelengkap
a Box Gate Valve Pipa OD 160 mm unit 2.00
Uraian pekerjaan per 1 unit bangunan :
1. Galian Tanah Biasa m3 2.82 10
2. Urugan Pasir m3 0.07 10
3. Pekerjaan Plesteran 1 : 2 m2 10.70 10
4. Pekerjaan Acian 1 : 2 m2 10.70 10
5. Beton K125 (rabat) m3 0.07 10
6. Beton K 175 m3 2.00 10
7. Pembesian kg 323.45 10
8. Begisting 2x Pakai m2 19.27 10
Sub Jumlah
b Box Gate Valve Pipa OD 110 mm unit 5.00
Uraian pekerjaan per 1 unit bangunan :
1. Galian Tanah Biasa m3 2.75 10
2. Urugan Pasir m3 0.07 10
3. Pekerjaan Plesteran 1 : 2 m2 10.50 10
4. Pekerjaan Acian 1 : 2 m2 10.50 10
5. Beton K125 (rabat) m3 0.07 10
6. Beton K 175 m3 1.95 10
7. Pembesian kg 319.98 10
8. Begisting m2 18.87 10
Sub Jumlah
c Box Gate Valve Pipa OD 90 mm unit 4.00
Uraian pekerjaan per 1 unit bangunan :
1. Galian Tanah Biasa m3 2.72 10
2. Urugan Pasir m3 0.07 10
3. Pekerjaan Plesteran 1 : 2 m2 10.42 10
4. Pekerjaan Acian 1 : 2 m2 10.42 10
5. Beton K125 (rabat) m3 0.07 10
6. Beton K 175 m3 1.93 10
7. Pembesian kg 318.59 10
8. Begisting m2 18.71 10
Sub Jumlah
HARGA SATUAN PAJAK TOTAL
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) % Rp. ( Rp )
1 2 3 4.00 5.00 6 7.00
d Box Gate Valve Pipa OD 63 mm unit 1.00
Uraian pekerjaan per 1 unit bangunan :
1. Galian Tanah Biasa m3 2.72 10
2. Urugan Pasir m3 0.07 10
3. Pekerjaan Plesteran 1 : 2 m2 10.42 10
4. Pekerjaan Acian 1 : 2 m2 10.42 10
5. Beton K125 (rabat) m3 0.07 10
6. Beton K 175 m3 1.93 10
7. Pembesian kg 318.59 10
8. Begisting m2 18.71 10
Sub Jumlah
e Air Valve unit 1.00
Uraian pekerjaan per 1 unit bangunan :
1. Galian Tanah Biasa m3 1.95 10
2. Pekerjaan Plesteran 1 : 2 m2 8.47 10
3. Pekerjaan Acian 1 : 2 m2 8.47 10
4. Beton K 225 m3 0.76 10
5. Pembesian kg 226.26 10
6. Begisting m2 7.07 10
Sub Jumlah
f Jembatan P=12 m
1. Galian Tanah berbatu m3 4.12 10
2. Galian tanah biasa m3 9.60 10
3. Urugan tanah kembali dipadatkan m3 9.63 10
4. Urugan Pasir m3 0.61 10
5. Beton K225 m3 5.08 10
6. Baja Frofil dengan Pengelasan kg 474.00 10
7. Plat Andas dan Plat Sambung kg 72.72 10
8. Pelat buhul / pengaku kg 9.42 10
9. Stiffener kg 21.20 10
10. Baja Tulangan kg 923.59 10
11. Begesting Batako kg 5.60 10
12. Begisting m2 25.37 10
13. Baut 3/4" bh 64.00 10
14. Baut besar bh 24.00 10
15. Angker dia 19 mm bh 12.00 10
16. Pelat Klem pipa bh 12.00 10
17. Besi dia 20 mm kg 4.14 10
18. Cat Jembatan + Pipa m2 15.05 10
Sub Jumlah
JUMLAH - VIII
HARGA SATUAN PAJAK TOTAL
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) % Rp. ( Rp )
1 2 3 4.00 5.00 6 7.00
IX Pekerjaan Lain-Lain
1. Pasangan Batu Kali Camp. 1smn : 5 psr m³ 864.44 10
2. Beton Camp. K 125 m³ 22.87 10
3. Beton K 175 /Trush Block m3 4.06 10
4. Pembesian/Trush Block kg 56.90 10
5. Begesting 2x Pakai Trush Block m2 13.62 10
6. Pembuatan dan Pemasangan Pelindung Air valve Bh 1.00 10
7. Pembuatan dan Pemasangan Beton KS Bh 12.00 10
8. Pembuatan dan Pemasangan patok Ujung pipa Bh 1.00 10
9. Pembersihan Akhir Ls 1.00 10
JUMLAH - IX
JUMLAH D
DAFTAR KUANTITAS DAN HARGA

HARGA SATUAN PAJAK TOTAL


NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) % Rp. ( Rp )
1 2 3 4.00 5.00 6 7.00
E PEKERJAAN DARI JALAN NASIONAL (-400 M) MENUJU RESERVOAR PANGKUNG PARUK
E1 PEKERJAAN OPEN TRENCH DGN CLEAN CONSTRUCTION
Pekerjaan Tanah Pada Pipa dia OD 312.4 mm
1 Eksisting Unpavement m' 1,222.00 10
2 Eksisting Hot Mix m' 500.00 10
JUMLAH E1

E2 PEKERJAAN PERKERASAN /PENGASPALAN


1 Lapis Resap Pengikat - Aspal Cair liter 585.00 10
2 Lapis Perekat - Aspal Cair liter 225.00 10
3 Laston Lapis Aus (AC-WC) (gradasi halus/kasar) ton 39.60 10

JUMLAH E2

E3 PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA DAN ACCESSORIES


1. Pipa GIP dia OD 312.4 mm, tebal 6.4 mm m 1,722.00 10
2. Bend 22,5° Pipa GIP dia OD 312.4 mm, tebal 6.4 mm bh 5.00 10
3. Bend 45° Pipa GIP dia OD 312.4 mm, tebal 6.4 mm bh 3.00 10
4. Reducer 16"x18" bh 1.00 10
5. Double Air Valve dia 2'' bh 2.00 10
JUMLAH E3

E4 PEKERJAAN PENYAMBUNGAN (PENGELASAN)


1. Penyambungan Pipa GIP dan Accessories cm 26,978.00 10
JUMLAH E4
E5 PEKERJAAN PENGETESAN PIPA DAN ACCESSORIES
1. Pipa GIP dia OD 312.4 mm, tebal 6.4 mm m 1,722.00 10
JUMLAH E5
E6 PEKERJAAN FLUSHING PIPA DAN ACCESSORIES
1. Pipa GIP dia OD 312.4 mm, tebal 6.4 mm m 1,722.00 10
JUMLAH E6
E7 PEKERJAAN BANGUNAN PELENGKAP
1 Box Gate Valve Pipa OD 312.4 mm unit 1.00
Uraian pekerjaan per 1 unit bangunan :
- Galian Tanah Biasa m3 3.64 10
- Urugan Pasir m3 0.22 10
- Pekerjaan Plesteran 1 : 2 m2 12.93 10
- Pekerjaan Acian 1 : 2 m2 12.93 10
- Beton K175 m3 0.13 10
- Beton K225 m3 2.61 10
- Baja Tulangan kg 287.00 10
- Begisting m2 12.93 10

2 Air Valve unit 2.00


Uraian pekerjaan per 1 unit bangunan :
- Galian Tanah Biasa m3 3.26 10
- Urugan tanah kembali dipadatkan m3 0.20 10
- Pekerjaan Plesteran 1 : 2 m2 13.03 10
- Pekerjaan Acian 1 : 2 m2 13.03 10
- Beton K225 m3 0.20 10
- Baja Tulangan kg 281.04 10
- Begisting m2 13.03 10
HARGA SATUAN PAJAK TOTAL
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) % Rp. ( Rp )
1 2 3 4.00 5.00 6 7.00
HARGA SATUAN PAJAK TOTAL
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) % Rp. ( Rp )
1 2 3 4.00 5.00 6 7.00
3 PEKERJAAN LAIN LAIN
- Pasangan Batu Kali Camp. 1smn : 4 psr m³ 11.81 10
- Pembuatan dan Pemasangan Beton KS Bh 3.00 10
JUMLAH E7
JUMLAH E

F PEKERJAAN RESERVOIR PANGKUNG PARUK


F1 BANGUNAN RESERVOIR PANGKUNG PARUK KAPASITAS 450 M3
A Pekerjaan Tanah
1. Pengukuran dan Pasang Bowplank m' 44.35 10
2. Galian Tanah dengan excavator m3 634.02 10
3. Urugan Tanah Kembali dengan Pemadatan m3 79.25 10
4. Urugan Pasir t = 10 cm m3 15.10 10

B PEKERJAAN STRUKTUR ATAU SIPIL DAN ASITEKTUR


I Pekerjaan Beton
1 Lantai Kerja K - 125
- Beton Cor K125 m3 15.10 10
2 Pekerjaan Sloof 20/25
- Beton Cor K-300 m3 4.19 10
- Pekerjaan Besi Beton Kg 1,039.66 10
- Begesting Pasangan Batako m2 20.93 10
3 Pekerjaan Sloof 25/25
- Beton Cor K-300 m3 1.88 10
- Pekerjaan Besi Beton Kg 381.06 10
- Begesting Pasangan Batako m2 7.54 10
4 Pekerjaan Beton Lantai
- Beton Cor K-300 m3 36.56 10
- Pekerjaan Besi Beton Kg 3,350.94 10
5 Pekerjaan Beton Kolom 20/35
- Beton Cor K-300 m3 4.48 10
- Pekerjaan Besi Beton Kg 1,454.60 10
- Begesting 2 X pakai m2 70.40 10
6 Pekerjaan Beton Kolom 25/25
- Beton Cor K-300 m3 1.50 10
- Pekerjaan Besi Beton Kg 389.32 10
- Begesting 2 X pakai m2 24.00 10
7 Pekerjaan Beton Dinding
- Beton Cor K-300 m3 41.88 10
- Pekerjaan Besi Beton Kg 4,579.81 10
- Begesting 2 X pakai m2 418.77 10

8 Pekerjaan Beton Balok 20/25


- Beton Cor K-300 m3 5.70 10
- Pekerjaan Besi Beton Kg 1,427.70 10
- Begesting 2 X pakai m2 79.80 10
9 Pekerjaan Beton Plat Atap
- Beton Cor K-300 m3 14.53 10
- Pekerjaan Besi Beton Kg 1,624.53 10
- Begesting m2 150.97 10

II Pekerjaan Pasangan dan Pelapis


1. Pekerjaan Pas, Dinding Bata Merah m2 75.60 10
2. Pekerjaan Water Proofing m2 657.77 10
3. Pekerjaan Water Stop m 114.10 10
4. Pekerjaan Plesteran 1 PC : 2 Ps m2 151.20 10
5. Pekerjaan Acian m2 151.20 10
6. Pasangan Batu Kali 1:4 m3 38.21 10
7. Siar Batu Kali m2 46.28 10
HARGA SATUAN PAJAK TOTAL
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) % Rp. ( Rp )
1 2 3 4.00 5.00 6 7.00
HARGA SATUAN PAJAK TOTAL
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) % Rp. ( Rp )
1 2 3 4.00 5.00 6 7.00
III Pekerjaan Kusen Pintu dan Relling
1. Pekerjaan Pipa Ventilasi GIP 4" Unit 4.00 10
2. Pekerjaan Penutup Man Hole Plat Besi T= 1.2 mm Unit 5.00 10
3. Pekerjaan Tangga Inspeksi Pipa GIP Unit 5.00 10

IV PEKERJAAN PIPA DAN ACCESSORIES


Pengadaan Dan Pemasangan
1. Pipa In Flow GIP OD 457,2 mm, tebal dinding 9.5 mm m 60.00 10
2. Pipa Penguras dan Over Flow OD 355.6 mm, tebal dinding 6.4 mm m 15.00 10
3. Pipa Out Flow GIP dia OD 273 mm, tebal dinding 6,4 mm m 30.00 10
4. Bend 90 OD 457,2 mm, tebal dinding 9,5 mm bh 4.00 10
5. Bend 90 dia.OD 355.6 mm, tebal dinding 6.4 mm bh 2.00 10
6. Bend 22.5 dia.OD 273 mm, tebal dinding 6.4 mm bh 8.00 10
7. Tee OD 355,6 X 355,6 bh 1.00 10
8. Strainer Y OD Ø 355,6 bh 1.00 10
9. AF Gate Valve PN 16 dia. 14'' bh 1.00 10
10. AF Gate Valve PN 16 dia. 10'' bh 1.00 10
11. Dismantling Joint dia. 14'' bh 1.00 10
12. Dismantling Joint dia. 10'' bh 1.00 10
13. Elektromagnetic Flow Meter 10" bh 1.00 10
14. Wallpipe dia. 14" bh 2.00 10
15. Wallpipe dia. 10" bh 1.00 10
16. Wallpipe dia. 18" bh 1.00 10
17. Saringan dia. 10'' bh 1.00 10
18. Bend 45 OD 457,2 mm, tebal dinding 9,5 mm bh 2.00 10
19. Penyambungan
- Pipa In Flow GIP OD 457,2 mm, tebal dinding 9.5 mm cm 1,636.95 10
20. Pengetesan
- Pipa In Flow GIP OD 457,2 mm, tebal dinding 9.5 mm m 60.00 10
- Pipa Penguras dan Over Flow OD 355.6 mm, tebal dinding 6.4 mm m 15.00 10
'- Pipa PVC R-R dia OD 350 mm S10 m 30.00 10
- Pipa Out Flow GIP dia OD 273 mm, tebal dinding 6,4 mm bh 45.00 10
21. Flushing
- Pipa In Flow GIP OD 457,2 mm, tebal dinding 9.5 mm m 60.00 10
- Pipa Penguras dan Over Flow OD 355.6 mm, tebal dinding 6.4 mm m 15.00 10
- Pipa PVC R-R dia OD 350 mm S10 m 30.00 10
- Pipa Out Flow GIP dia OD 273 mm, tebal dinding 6,4 mm bh 45.00 10
22. Floating Valve
- Altitude Control Valve dia 12" PN 16 bh 1.00 10
- Y Strainer dia 12" PN 16 bh 1.00 10
- Universal Flange Adaptor dia 12" PN 16 bh 5.00 10
- Gate Valve Risilent Seat dia 12" PN 16 bh 3.00 10
- Watermeter Mekanikal + data logger bh 1.00 10
- Baut bh 144.00 10
- Karet Packing 12" bh 6.00 10

JUMLAH F
DAFTAR KUANTITAS DAN HARGA

HARGA SATUAN PAJAK TOTAL


NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) % Rp. ( Rp )
1 2 3 4 5 6 7
G PEKERJAAN PENGADAAN DAN PEMASANGAN POMPA DI RESERVOAR INDUK IPA ATAS
1. Pompa dan Accessories
- Multistage centrifugal Pump (Q=5 lt/dt, H=100 m) Unit 2.000 10
- Kabel Power NYY 4 x 10 mm m' 50.000 10
- Panel Control Pompa 15 kw set 2.000 10
- Kabel Power NYY 4 x 16 mm m' 75.000 10
- Skun Kabel 10 mm (Cu) set 24.000 10
- Skun Kabel 16 mm (Cu) set 24.000 10
- Electrode level set 2.000 10

2. Perpipaan
- Ø 65 mm Strainer unit 4.000 10
- Ø 65 mm Ball valve unit 4.000 10
- Ø 65 mm Flexible Joint unit 8.000 10
- Ø 80 mm Ball valve unit 1.000 10
- Ø 80 mm Check Valve unit 2.000 10
- Ø 100 mm Pipa Header unit 1.000 10
- Ø 80 mm Pipa Header unit 1.000 10
- Ø 65 mm Steel pipa m' 12.000 10
- Ø 80 mm Steel pipa m' 12.000 10

3. Electro Clorinasi
- Diapraghma Dosing Pump, Variable Speed (Kap: 200 L/H, H=4 Bar, P=62 unit 2.000 10
Watt/ 1 x 220 V/ 50 Hz) dan asesories
JUMLAH G
NAMA PEKERJAAN : Pembangunan SPAM Regional Burana Titab

NO URAIAN SAT VOL HARGA SATUAN TOTAL HARGA


H SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA (SMK3)

1 Penyiapan RK3K terdiri atas:


a. Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja Set 1
Dan
b. Pembuatan Kartu Identitas Pekerja (KIP); Or 80

2 Sosialisasi dan Promosi K3 terdiri atas:


a. Induksi K3 (Safety Induction ); khusus untuk pekerja baru Or 80
b. Pelatihan K3;
1. Bekerja di Ketinggian Or 20
2. K3 Peralatan Konstruksi & Penggunaan bahan Kimia Or 20
(MSDS)
3. Analysis Keselamatan Pekerjaan Or 50
4. Perilaku Berbasis Keselamatan (Budaya K3) Or 80
c. Simulasi K3; Or 80
d. Spanduk (banner) ; lb 15
e. Poster; lb 15
f. Papan Informasi K3. bh 4

3 Alat Pelindung Kerja terdiri atas:


a. Tali Keselamatan (Life Line); Ls 4

4 Alat Pelindung Diri terdiri atas:


a. Topi Pelindung (Safety Helmet) ; Bh 90
b. Pelindung Mata (Goggles, Spectacles); psg 50
c. Tameng Muka (Face Shield); bh 10
d. Pelindung Pernafasan Dan Mulut (Masker); bh 50
e. Sarung Tangan (Safety Gloves); psg 50
f. Sepatu Keselamatan (Safety Shoes); untuk Staf psg 20
g. Sepatu Keselamatan (Rubber Safety Shoes_and toe cap) psg 90
h. Penunjang Seluruh Tubuh (Full Body Harness); bh 15
i. Rompi Keselamatan (Safety Vest); bh 90
j. Celemek (Apron/Coveralls); Bh 90
k. Pelindung Jatuh (Fall Arrester); Bh 10

5 Fasilitas sarana kesehatan;

a. Peralatan P3K (Kotak P3K, Tandu, Tabung Oksigen, Obat ls 1


Luka, Perban, dll)
b. Ruang P3K (Tempat Tidur Pasien); ls 1
c. Peralatan Pengasapan (Fogging) ; bh 1
d. Obat Pengasapan. kali 4
NO URAIAN SAT VOL HARGA SATUAN TOTAL HARGA

6 Rambu- Rambu terdiri atas :


a. Rambu Petunjuk; bh 12
b. Rambu Larangan; bh 12
c. Rambu Peringatan; bh 12
d. Rambu Kewajiban; bh 12
e. Rambu Informasi; bh 12

7 Lain- Lain Terkait Pengendalian Risiko K3


a. Alat Pemadam Api Ringan (APAR); 10Kg bh 10
b. Sirine; bh 2
c. Bendera K3; bh 2
d. Jalur Evakuasi (Escape Route ); ls 1
e. Lampu Darurat (Emergency Lamp ); bh 4
f. Pelaporan dan Penyelidikan Insiden. ls 1
Pekerjaan 10 cm pengelasan dengan las listrik
PP1 NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.040 - -
Mandor OH 0.004 - -
Tukang Las OH 0.020 - -
Kepala Tukang Las OH 0.002 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Kawat Las Kg 0.4000 - -
Solar industri Liter 0.3000 - -
Minyak Pelumas Liter 0.0400 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Las Listrik 250 A diesel Hari 0.0028 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
G. Harga Satuan Pekerjaan / cm -

NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA


(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.353 - -
Tukang Pipa OH 0.676 - -
Mandor OH 0.135 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Pipa GIP OD 457.2 mm m 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari - - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

PP3 Pemasangan 1 m pipa GIP OD 355,6 mm, tebal 6,4 mm


NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.958 - -
Tukang Pipa OH 0.479 - -
Mandor OH 0.096 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Pipa GIP OD 355,6 mm m 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari - - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

Pemasangan 1 m pipa GIP OD 312.4 mm, tebal 6,4 mm


NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.958 - -
Tukang Pipa OH 0.479 - -
Mandor OH 0.096 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Pipa GIP OD 312.4 mm m 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari - - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
PP4 Pemasangan 1 m pipa GIP OD 273 mm, tebal 6,4 mm
NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.949 - -
Tukang Pipa OH 0.475 - -
Mandor OH 0.095 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Pipa GIP OD 273 mm m 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari - - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

PP5 Pemasangan 1 m pipa GIP OD 165,1 mm, tebal 5 mm


NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.506 - -
Tukang Pipa OH 0.253 - -
Mandor OH 0.051 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Pipa GIP OD 165.1 mm m 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari 0.0000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
PP6 Pemasangan 1 m pipa GIP OD 114,3 mm, tebal 4,5 mm
NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.400 - -
Tukang Pipa OH 0.200 - -
Mandor OH 0.040 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Pipa GIP OD 114,3 mm m 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari 0.0000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

PP7 Pemasangan 1 m pipa GIP OD 88,9 mm, tebal 4 mm


NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.345 - -
Tukang Pipa OH 0.172 - -
Mandor OH 0.034 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Pipa GIP OD 88,9 mm m 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari 0.0000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
PP8 Pemasangan 1 m pipa GIP OD 60,3 mm, tebal 3,6 mm
NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.345 - -
Tukang Pipa OH 0.172 - -
Mandor OH 0.034 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Pipa GIP OD 88,9 mm m 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari 0.0000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
PP9 Pemasangan 1 bh bend 90º pipa GIP OD 457,2 mm, tebal 9,5 mm
NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 3.429 - -
Tukang Pipa OH 1.715 - -
Mandor OH 0.343 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Bend 90º pipa GIP OD 457.2 mm bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari 1.0000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

PP10 Pemasangan 1 bh bend 45º pipa GIP OD 457,2 mm, tebal 9,5 mm
NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 3.429 - -
Tukang Pipa OH 1.715 - -
Mandor OH 0.343 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Bend 45º pipa GIP OD 457.2 mm bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari 1.0000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
PP11 Pemasangan 1 bh bend 22.5º pipa GIP OD 457,2 mm, tebal 9,5 mm
NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 3.429 - -
Tukang Pipa OH 1.715 - -
Mandor OH 0.343 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Bend 22.5º pipa GIP OD 457.2 m bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari 1.0000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

PP12 Pemasangan 1 bh bend 11.25º pipa GIP OD 457,2 mm, tebal 9,5 mm
NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 3.429 - -
Tukang Pipa OH 1.715 - -
Mandor OH 0.343 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Bend 11.25º pipa GIP OD 457.2 bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari 1.0000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
PP13 Pemasangan 1 bh bend 90º pipa GIP OD 312.4 mm
NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 2.000 - -
Tukang Pipa OH 1.000 - -
Mandor OH 0.200 - -
JUMLAH TENAGA KERJA -
B. BAHAN
bend 90º pipa GIP OD 312.4 mm bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari 1.0000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

PP10 Pemasangan 1 bh bend 45º pipa GIP OD 312.4 mm


NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 3.429 - -
Tukang Pipa OH 1.715 - -
Mandor OH 0.343 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Bend 45º pipa GIP OD 312.4 mm bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari 1.0000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

PP11 Pemasangan 1 bh bend 22.5º pipa GIP OD 312.4 mm


NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 3.429 - -
Tukang Pipa OH 1.715 - -
Mandor OH 0.343 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Bend 22.5º pipa GIP OD 312.4 m bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari 1.0000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

PP14 Pemasangan 1 bh Tee dia 18'' x 18''


NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Mandor OH 0.766 - -
Tukang Pipa OH 0.383 - -
Pekerja OH 0.077 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Pengelasan cm 143.561 - -
Tee dia 18'' x 18 '' bh 1.000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Ls 1.0000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

PP15 Pemasangan 1 bh tee pipa GIP OD 355,6 x 355.6 mm


NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.436 - -
Tukang Pipa OH 0.218 - -
Mandor OH 0.044 - -
JUMLAH TENAGA KERJA -
B. BAHAN
tee pipa GIP OD 355,6 x 355.6 m bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari 0.5000 - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

PP16 Pemasangan 1 bh bend 90º pipa GIP OD 273 mm, tebal 6,4 mm
NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.714 - -
Tukang Pipa OH 0.857 - -
Mandor OH 0.171 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Bend 90º pipa GIP OD 273 mm bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari 0.4000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

PP17 Pemasangan 1 bh bend 45º pipa GIP OD 273 mm, tebal 6,4 mm
NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.714 - -
Tukang Pipa OH 0.857 - -
Mandor OH 0.171 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Bend 45º pipa GIP OD 273 mm bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari 0.4000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
PP18 Pemasangan 1 bh bend 22,5º pipa GIP OD 273 mm, tebal 6,4 mm
NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.714 - -
Tukang Pipa OH 0.857 - -
Mandor OH 0.171 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Bend 22,5º pipa GIP OD 273 mm bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari 0.4000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

PP19 Pemasangan 1 bh bend 90º pipa GIP OD 165,1 mm, tebal 5 mm


NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.429 - -
Tukang Pipa OH 0.715 - -
Mandor OH 0.143 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Bend 90º pipa GIP OD 165,1 mm bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari 0.1000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
PP20 Pemasangan 1 bh bend 45º pipa GIP OD 165,1 mm, tebal 5 mm
NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.429 - -
Tukang Pipa OH 0.715 - -
Mandor OH 0.143 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Bend 45º pipa GIP OD 165,1 mm bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari 0.1000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

PP21 Pemasangan 1 bh bend 22,5º pipa GIP OD 165,1 mm, tebal 5 mm


NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.429 - -
Tukang Pipa OH 0.715 - -
Mandor OH 0.143 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Bend 22,5º pipa GIP OD 165,1 m bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari 0.1000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
PP22 Pemasangan 1 bh bend 90º pipa GIP OD 114,3 mm, tebal 4,5 mm
NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.429 - -
Tukang Pipa OH 0.715 - -
Mandor OH 0.143 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Bend 90º pipa GIP OD 114,3 mm bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari 0.1000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

PP23 Pemasangan 1 bh bend 45º pipa GIP OD 114,3 mm, tebal 4,5 mm
NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.429 - -
Tukang Pipa OH 0.715 - -
Mandor OH 0.143 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Bend 45º pipa GIP OD 114,3 mm bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari 0.1000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
PP24 Pemasangan 1 bh bend 22,5º pipa GIP OD 114,3 mm, tebal 4,5 mm
NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.429 - -
Tukang Pipa OH 0.715 - -
Mandor OH 0.143 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Bend 22,5º pipa GIP OD 114,3 m bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari 0.1000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

PP25 Pemasangan 1 bh bend 90º pipa GIP OD 88,9 mm, tebal 4 mm


NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.429 - -
Tukang Pipa OH 0.715 - -
Mandor OH 0.143 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Bend 90º pipa GIP OD 88,9 mm bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari 0.1000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
PP26 Pemasangan 1 bh bend 45º pipa GIP OD 88,9 mm, tebal 4 mm
NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.429 - -
Err:509 Tukang Pipa OH 0.715 - -
Mandor OH 0.143 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Bend 45º pipa GIP OD 88,9 mm bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari 0.1000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

PP27 Pemasangan 1 bh bend 22,5º pipa GIP OD 88,9 mm, tebal 4 mm


NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.429 - -
0 Tukang Pipa OH 0.715 - -
Mandor OH 0.143 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Bend 22,5º pipa GIP OD 88,9 mm bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari 0.1000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
PP28 Pemasangan 1 bh bend 90º pipa GIP OD 60,3 mm, tebal 3,6 mm
NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.429 - -
Tukang Pipa OH 0.715 - -
Mandor OH 0.143 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Bend 90º pipa GIP OD 60,3 mm bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari 0.1000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

PP29 Pemasangan 1 bh bend 45º pipa GIP OD 60,3 mm, tebal 3,6 mm
NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.429 - -
Tukang Pipa OH 0.715 - -
Mandor OH 0.143 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Bend 45º pipa GIP OD 60,3 mm bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari 0.1000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
PP30 Pemasangan 1 bh bend 22,5º pipa GIP OD 60,3 mm, tebal 3,6 mm
NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.429 - -
Tukang Pipa OH 0.715 - -
Mandor OH 0.143 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Bend 22,5º pipa GIP OD 60,3 mm bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari 0.1000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

PP31 Pemasangan 1 bh tee pipa GIP OD 457,2 x 457,2 mm


NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.766 - -
Tukang Pipa OH 0.383 - -
Mandor OH 0.077 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Tee Pipa GIP OD 457.2 x 457,2 bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari 0.5000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
PP32 Pemasangan 1 bh tee pipa GIP OD 457,2 x 273 mm
NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.766 - -
Tukang Pipa OH 0.383 - -
Mandor OH 0.077 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Tee Pipa GIP OD 457.2 x 273 m bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari 0.5000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
PP33 Pemasangan 1 bh tee pipa GIP dia 6''
NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.106 - -
Tukang Pipa OH 0.053 - -
Mandor OH 0.011 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Tee Pipa GIP dia 6'' bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari 0.0280 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

PP34 Pemasangan 1 bh tee pipa GIP dia 4''


NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.106 - -
Tukang Pipa OH 0.053 - -
Mandor OH 0.011 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Tee Pipa GIP dia 4'' bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari 0.0280 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
PP35 Pemasangan 1 bh tee pipa GIP dia 3''
NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.106 - -
Tukang Pipa OH 0.053 - -
Mandor OH 0.011 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Tee Pipa GIP dia 3'' bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari 0.0280 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

PP36 Pemasangan 1 bh reducer dia 16'' x 18''


NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.656 - -
Tukang Pipa OH 0.328 - -
Mandor OH 0.066 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Reducer 16'' x 18'' bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari 0.1000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

PP37 Pemasangan 1 bh reducer dia 6'' x 4''


NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.429 - -
Tukang Pipa OH 0.715 - -
Mandor OH 0.143 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Reducer 6'' x 4'' bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari 0.1000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

PP38 Pemasangan 1 bh reducer dia 3'' x 2''


NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.429 - -
Tukang Pipa OH 0.715 - -
Mandor OH 0.143 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Reducer 3'' x 2'' bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari 0.1000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
PP39 Pemasangan 1 bh gate valve OD 457,2 mm
NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 3.429 - -
Tukang Pipa OH 1.715 - -
Mandor OH 0.343 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Gate Valve OD 457.2 mm bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari 1.0000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

PP40 Pemasangan 1 bh gate valve OD 406.4 mm


NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 3.429 - -
Tukang Pipa OH 1.715 - -
Mandor OH 0.343 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Gate Valve OD 406.4 mm bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari 1.0000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

PP41 Pemasangan 1 bh gate valve OD 355.6 mm


NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 2.000 - -
Tukang Pipa OH 1.000 - -
Mandor OH 0.200 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Gate Valve OD 355.6 mm bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari 0.5000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

Pemasangan 1 bh gate valve OD 312.4 mm


NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 2.000 - -
Tukang Pipa OH 1.000 - -
Mandor OH 0.200 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Gate Valve OD 312.4 mm bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari 0.5000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
PP42 Pemasangan 1 bh gate valve OD 273 mm
NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.714 - -
Tukang Pipa OH 0.857 - -
Mandor OH 0.171 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Gate Valve OD 273 mm bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari 0.4000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
PP43 Pemasangan 1 bh Gate Valve dia 6''
NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.429 - -
Tukang Pipa OH 0.715 - -
Mandor OH 0.143 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Gate Valve 6'' bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari 0.1000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

PP44 Pemasangan 1 bh gate valve dia 4''


NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.429 - -
Tukang Pipa OH 0.715 - -
Mandor OH 0.143 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Gate Valve dia 4'' bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari 0.1000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
PP45 Pemasangan 1 bh gate valve dia 3''
NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.429 - -
Tukang Pipa OH 0.715 - -
Mandor OH 0.143 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Gate Valve dia 3'' bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari 0.1000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

PP46 Pemasangan 1 bh gate valve dia 2''


NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.429 - -
Tukang Pipa OH 0.715 - -
Mandor OH 0.143 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Gate Valve dia 2'' bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari 0.1000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

PP47 Pemasangan 1 bh dismantling joint OD 355.6 mm


NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 3.429 - -
Tukang Pipa OH 1.715 - -
Mandor OH 0.343 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Dismantling Joint OD 355.6 mm bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari 1.0000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

PP48 Pemasangan 1 bh dismantling joint OD 457.2 mm


NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 3.429 - -
Tukang Pipa OH 1.715 - -
Mandor OH 0.343 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Dismantling Joint OD 457.2 mm bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari 1.0000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

PP49 Pemasangan 1 bh dismantling joint OD 273 mm


NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.714 - -
Tukang Pipa OH 0.857 - -
Mandor OH 0.171 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Dismantling Joint OD 355.6 mm bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari 0.4000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

PP50 Pemasangan 1 bh dismantling joint OD 273 mm


NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.714 - -
Tukang Pipa OH 0.857 - -
Mandor OH 0.171 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Dismantling Joint OD 273 mm bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari 0.4000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
PP51 Pemasangan 1 bh air valve dia 2''
NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.714 - -
Tukang Pipa OH 0.857 - -
Mandor OH 0.171 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Air Valve dia 2'' bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari 0.4000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

PP52 Pemasangan 1 bh air valve dia 1''


NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.714 - -
Tukang Pipa OH 0.857 - -
Mandor OH 0.171 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Air Valve dia 1'' bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari 0.4000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

PP53 Pemasangan 1 bh air valve doble dia 2''


NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 2.000 - -
Tukang Pipa OH 1.000 - -
Mandor OH 0.200 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Air Valve Doble dia 2'' bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari 0.5000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
PP54 Pemasangan 1 bh flange las OD 457,2 mm
NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 3.429 - -
Tukang Pipa OH 1.715 - -
Mandor OH 0.343 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Flange Las OD 457.2 mm bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari 1.0000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

PP55 Pemasangan 1 bh flange las OD 406.4 mm


NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 3.429 - -
Tukang Pipa OH 1.715 - -
Mandor OH 0.343 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Flange Las OD 406.4 mm bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari 1.0000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

Pemasangan 1 bh flange las OD 312.4 mm


NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 3.429 - -
Tukang Pipa OH 1.715 - -
Mandor OH 0.343 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Flange Las OD 312.4 mm bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari 1.0000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

PP56 Pemasangan 1 bh flange las OD 273 mm


NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.714 - -
Tukang Pipa OH 0.857 - -
Mandor OH 0.171 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Flange Las OD 273 mm bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari 0.4000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
PP57 Pemasangan 1 bh floating valve dia 3''
NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.429 - -
Tukang Pipa OH 0.715 - -
Mandor OH 0.143 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Floating Valve dia 3'' bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari 0.1000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

PP58 Pemasangan 1 bh watermeter dia 4''


NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.429 - -
Tukang Pipa OH 0.715 - -
Mandor OH 0.143 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Watermeter dia 4'' bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari 0.1000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
PP59 Pemasangan 1 bh watermeter dia 3''
NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.429 - -
Tukang Pipa OH 0.715 - -
Mandor OH 0.143 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Watemeter dia 3'' bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari 0.1000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
PP60 Pengetesan 1 m' pipa OD 457,2 mm
NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.008 - -
Mandor OH 0.001 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Air test (air bersih) m3 0.126 - -
Bahan bakar liter 0.060 - -
Oli liter 0.0020 - -
JUMLAH HARGA BAHAN -
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

PP61 Pengetesan 1 m' pipa OD 406,4 mm


NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.008 - -
Mandor OH 0.001 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Air test (air bersih) m3 0.126 - -
Bahan bakar liter 0.060 - -
Oli liter 0.0020 - -
JUMLAH HARGA BAHAN -
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
PP62 Pengetesan 1 m' pipa OD 355,6 mm
NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.008 - -
Mandor OH 0.001 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Air test (air bersih) m3 0.071 - -
Bahan bakar liter 0.060 - -
Oli liter 0.0020 - -
JUMLAH HARGA BAHAN -
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

Pengetesan 1 m' pipa OD 312.4 mm


NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.008 - -
Mandor OH 0.001 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Air test (air bersih) m3 0.071 - -
Bahan bakar liter 0.060 - -
Oli liter 0.0020 - -
JUMLAH HARGA BAHAN -
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

PP63 Pengetesan 1 m' pipa OD 273 mm


NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.008 - -
Mandor OH 0.001 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Air test (air bersih) m3 0.049 - -
Bahan bakar liter 0.060 - -
Oli liter 0.0020 - -
JUMLAH HARGA BAHAN -
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
PP64 Pengetesan 1 m' pipa OD 165,1 mm
NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.008 - -
Mandor OH 0.001 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Air test (air bersih) m3 0.049 - -
Bahan bakar liter 0.060 - -
Oli liter 0.0020 - -
JUMLAH HARGA BAHAN -
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

PP65 Pengetesan 1 m' pipa OD 114,3 mm


NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.008 - -
Mandor OH 0.001 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Air test (air bersih) m3 0.021 - -
Bahan bakar liter 0.025 - -
Oli liter 0.0008 - -
JUMLAH HARGA BAHAN -
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
PP66 Pengetesan 1 m' pipa OD 88,9 mm
NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.008 - -
Mandor OH 0.001 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Air test (air bersih) m3 0.016 - -
Bahan bakar liter 0.020 - -
Oli liter 0.0007 - -
JUMLAH HARGA BAHAN -
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

PP67 Pengetesan 1 m' pipa OD 60,3 mm


NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.008 - -
Mandor OH 0.001 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Air test (air bersih) m3 0.011 - -
Bahan bakar liter 0.013 - -
Oli liter 0.0004 - -
JUMLAH HARGA BAHAN -
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

PP68 Flushing 500 m Pipa GIP dia.OD 457,2 mm,tebal 9,5 mm


NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 15.675 - -
Mandor OH 3.048 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Kaporit kg 71.289 - -
Air Bersih m3 71.7804 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
G. Harga Satuan Pekerjaan / m -
PP69 Flushing 500 m Pipa GIP dia.OD 406,4 mm,tebal 6.4 mm
NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 13.934 - -
Mandor OH 2.709 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Kaporit kg 50.800 - -
Air Bersih m3 108.4909 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
G. Harga Satuan Pekerjaan / m -

PP70 Flushing 500 m Pipa GIP dia.OD 355,6 mm,tebal 6.4 mm


NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 10.160 - -
Mandor OH 1.976 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Kaporit kg 44.450 - -
Air Bersih m3 69.7865 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
G. Harga Satuan Pekerjaan / m -
PP71 Flushing 500 m Pipa GIP dia.OD 273,05 mm, tebal 6.4 mm
NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 9.362 - -
Mandor OH 1.820 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Kaporit kg 34.131 - -
Air Bersih m3 53.5861 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
G. Harga Satuan Pekerjaan / m -

PP72 Flushing 500 m Pipa GIP dia.OD 165,1 mm, tebal 5 mm


NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 5.662 - -
Mandor OH 1.101 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Kaporit kg 20.641 - -
Air Bersih m3 32.4068 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
G. Harga Satuan Pekerjaan / m -
PP73 Flushing 500 m Pipa GIP dia.OD 114,3 mm, tebal 4,5 mm
NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 3.920 - -
Mandor OH 0.762 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Kaporit kg 14.290 - -
Air Bersih m3 22.4355 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
G. Harga Satuan Pekerjaan / m -

PP74 Flushing 500 m Pipa GIP dia.OD 88,9 mm, tebal 4 mm


NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 3.049 - -
Mandor OH 0.593 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Kaporit kg 11.115 - -
Air Bersih m3 17.4498 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
G. Harga Satuan Pekerjaan / m -
PP75 Flushing 500 m Pipa GIP dia.OD 60,3 mm, tebal 3,6 mm
NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 2.068 - -
Mandor OH 0.402 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Kaporit kg 7.539 - -
Air Bersih m3 11.8360 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
G. Harga Satuan Pekerjaan / m -

PP76 Pemasangan 1 bh reducer pipa GIP OD 406,4 X 355,6 mm


NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.656 - -
Tukang Pipa OH 0.328 - -
Mandor OH 0.066 - -
JUMLAH TENAGA KERJA -
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari 0.5000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

PP77 Penyambungan 1 bh Elekktromagnetic Flow Meter pipa GIP dia OD (10'')


NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Mandor OH 0.171 - -
Tukang Pipa OH 0.857 - -
Pekerja OH 1.714 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Pengelasan cm 78.5000 - -
Elekktromagnetic Flow Meter dia bh 1.000 - -
10"
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot/Tackel & Handle Cra Ls 0.4000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

PP78 Penyambungan 1 bh Strainer Y dia (16'')


NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Mandor OH 0.125 - -
Tukang Pipa OH 0.350 - -
Pekerja OH 1.050 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Pengelasan cm 125.6000 - -
Strainer Y 400 mm bh 1.000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot/Tackel & Handle Cra Ls 1.0000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

PP79 Penyambungan 1 bh Strainer Y dia OD (14'')


NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Mandor OH 0.123 - -
Tukang Pipa OH 0.330 - -
Pekerja OH 0.990 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Pengelasan cm 109.900 - -
Strainer Y 350 mm bh 1.000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot/Tackel & Handle Cra Ls 0.5000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

PP80 Penyambungan 1 bh Strainer Y dia OD (12'')


NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Mandor OH 0.122 - -
Tukang Pipa OH 0.320 - -
Pekerja OH 0.970 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Pengelasan cm 94.200 - -
Strainer Y 300 mm bh 1.000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot/Tackel & Handle Cra Ls 0.5000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

PP81 Penyambungan 1 bh Strainer Y dia (10'')


NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Mandor OH 0.171 - -
Tukang Pipa OH 0.857 - -
Pekerja OH 1.714 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Pengelasan cm 78.5000 - -
Strainer Y 250 mm bh 1.000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot/Tackel & Handle Cra Ls 0.4000 - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

PP82 Penyambungan 1 bh Strainer Y dia (8'')


NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Mandor OH 0.120 - -
Tukang Pipa OH 0.300 - -
Pekerja OH 0.950 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Pengelasan cm 62.8000 - -
Strainer Y 200 mm bh 1.000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot/Tackel & Handle Cra Ls 0.3000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

PP83 Penyambungan 1 bh Strainer Y dia (4'')


NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Mandor OH 0.077 - -
Tukang Pipa OH 0.220 - -
Pekerja OH 0.540 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Pengelasan cm 31.4000 - -
Strainer Y 100 mm bh 1.000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Alat Bantu Ls 0.1000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
PP84 Penyambungan 1 bh Saringan dia OD (10'')
NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Mandor OH 0.171 - -
Tukang Pipa OH 0.857 - -
Pekerja OH 1.714 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Pengelasan cm 78.5000 - -
Saringan 10" bh 1.000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot/Tackel & Handle Cra Ls 0.4000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

PP85 Penyambungan 1 bh Wallpipe pipa GIP dia (18'')


NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Mandor OH 0.343 - -
Tukang Pipa OH 1.715 - -
Pekerja OH 3.429 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Pengelasan cm 125.6000 - -
Wallpipe 450 mm bh 1.000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot/Tackel & Handle Cra Ls 1.0000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

PP86 Penyambungan 1 bh Wallpipe pipa GIP dia OD (14'')


NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Mandor OH 0.200 - -
Tukang Pipa OH 1.000 - -
Pekerja OH 2.000 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Pengelasan cm 109.900 - -
Wallpipe 350 mm bh 1.000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot/Tackel & Handle Cra Ls 0.5000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

PP87 Penyambungan 1 bh Wallpipe pipa GIP dia (10'')


NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Mandor OH 0.120 - -
Tukang Pipa OH 0.300 - -
Pekerja OH 0.950 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Pengelasan cm 78.5000 - -
Wallpipe 250 mm bh 1.000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot/Tackel & Handle Cra Ls 0.4000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

PP88 Pemasangan 1 buah Tangga Monyet 78.000


SATUAN KOEFISIEN HARGA SAT. JML. HARGA
NO. URAIAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 3.540 - -
Mandor OH 0.143 - -
Tukang Las OH 0.961 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Pipa GIP, dia. 32 mm M' 24.000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Mesin Las ( Welder ) unit/jam 1.890 - -
Mesin Gerinda unit/hr 1.890 - -
Kunci-kunci bh 0.750 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

PP89 Pekrejaan 1 bh Plat Penutup Main Hole Uk. 80x80 m 78.000


SATUAN KOEFISIEN HARGA SAT. JML. HARGA
NO. URAIAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.500 - -
Mandor OH 0.150 - -
Tukang Las OH 1.500 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Besi Pelat Lbr 0.330 - -
Besi Siku kg 25.636 - -
Kawat Las (Elektroda) kg 0.033 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Mesin Las ( Welder ) unit/jam 0.750 - -
Mesin Gerinda unit/hr 0.750 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

Pemasangan 1 bh Flange las dia 3''


NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.106 - -
Tukang Pipa OH 0.053 - -
Mandor OH 0.011 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Flange Las dia 3'' bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari 0.0280 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

Pemasangan 1 bh reducer dia 16'' x 12''


NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.656 - -
Tukang Pipa OH 0.328 - -
Mandor OH 0.066 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Reducer 16'' x 12'' bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Tripot / Tackel & handle cra Hari 0.1000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
DAFTAR ANALISA PEKERJAAN

Pengukuran dan pemasangan 1 m' Bouwplank


SP1 NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.100 - -
Tukang Kayu L.02 OH 0.010 - -
Kepala Tukang L.03 OH 0.010 - -
Mandor L.04 OH 0.010 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Kayu Seseh mᶟ 0.0130 - -
Paku biasa 2" - 3" Kg 0.0200 - -
Kayu papan Begesting mᶟ 0.0070 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

HARGA SATUAN PEKERJAAN TANAH


SP2 Penggalian 1 mᶟ tanah biasa sedalam 1 m
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.7500 - -
Mandor L.04 OH 0.0250 - -
JUMLAH TENAGA KERJA -
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
SP3 Pengurugan 1 mᶟ dengan tanah urug Dipadatkan
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.500 - -
Mandor L.04 OH 0.050 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Tanah Urug mᶟ 1.200 - -
JUMLAH HARGA BAHAN -
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

SP4 Pengurugan kembali 1 mᶟ galian tanah


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.5000 - -
Mandor L.04 OH 0.0500 - -
JUMLAH TENAGA KERJA -
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

SP5 Pemadatan tanah 1 mᶟ tanah ( per 20 cm )


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.5000 - -
Mandor L.04 OH 0.0500 - -
JUMLAH TENAGA KERJA -
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
SP6 Pemadatan 1 mᶟ tanah dengan stamper
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.5000 - -
Mandor L.04 OH 0.0500 - -
JUMLAH TENAGA KERJA -
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
Stamper E.31 unit/hari 0.0500 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

SP7 Pengurugan 1 m3 dengan pasir urug


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.3000 - -
Mandor L.04 OH 0.0100 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Pasir Urug m3 1.200 - -
JUMLAH HARGA BAHAN -
C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

SP8 Pemotongan 100 m' aspal


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.3000 - -
Mandor OH 0.0100 - -
JUMLAH TENAGA KERJA -
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN
Asphalt Cutter d = 30 cm jam 3.0000 - -
Dump Truck 4 ton jam 2.0000 - -
Blade Cutter bh 1.0000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
G. Harga Satuan 1 m' Pekerjaan -
SP9 Penggalian 1 mᶟ batu
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0357 - -
Mandor OH 0.0179 - -
JUMLAH TENAGA KERJA -
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN
Compressor Jam 0.1250 - -
Jack Hammer Jam 0.1250 - -
Excavator Jam 0.1250 - -
Dump Truck Jam 0.2463 - -
Alat bantu Ls 1.0000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

SP10 Penggalian tanah 1 mᶟ dengan excavator


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0179 - -
Mandor OH 0.0089 - -
JUMLAH TENAGA KERJA -
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN
Excavator Jam 0.0626 - -
Dump Truck Jam 0.1168 - -
Alat Bantu Ls 1.0000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
SP11 Memindahkan 1 mᶟ sisa galian tanah
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
JUMLAH TENAGA KERJA -
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN -
Dump Truck jam 0.2500 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

SP12 Pengurugan 1 mᶟ agregat A


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0071 - -
Mandor OH 0.0010 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Agregat A m3 1.259 - -
JUMLAH HARGA BAHAN -
C. PERALATAN -
Wheel Loader Jam 0.0071 - -
Dump Truck Jam 0.4222 - -
Motor Grader Jam 0.0094 - -
Tandem Roller Jam 0.0107 - -
Water Tanker Jam 0.0141 - -
Alat Bantu Ls 1.0000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
SP13 Pengurugan 1 mᶟ agregat B
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0071 - -
Mandor OH 0.0010 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Agregat B m3 1.259 - -
JUMLAH HARGA BAHAN -
C. PERALATAN -
Wheel Loader Jam 0.0071 - -
Dump Truck Jam 0.4222 - -
Motor Grader Jam 0.0094 - -
Tandem Roller Jam 0.0107 - -
Water Tanker Jam 0.0141 - -
Alat Bantu Ls 1.0000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

HARGA SATUAN PEKERJAAN PONDASI


SP14 Pemasangan 1 m3 pondasi batu kosong (anstamping)
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.7800 - -
Tukang Batu L.02 OH 0.3900 - -
Kepala Tukang L.03 OH 0.0390 - -
Mandor L.04 OH 0.0390 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Batu belah m3 1.200 - -
Pasir Urug m3 0.432 - -
JUMLAH HARGA BAHAN -
C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
SP15 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 5PP
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.5000 - -
Tukang Batu L.12 OH 0.7500 - -
Kepala Tukang L.04 OH 0.0750 - -
Mandor L.02 OH 0.0750 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Batu belah m3 1.200 - -
Semen Portland Kg 136.000 - -
Pasir Pasang m3 0.544 - -
JUMLAH HARGA BAHAN -
C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

SP16 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.5000 - -
Tukang Batu L.12 OH 0.7500 - -
Kepala Tukang L.04 OH 0.0750 - -
Mandor L.02 OH 0.0750 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Batu belah m3 1.200 - -
Semen Portland Kg 163.000 - -
Pasir Pasang m3 0.520 - -
JUMLAH HARGA BAHAN -
C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
HARGA SATUAN PEKERJAAN PASANGAN DINDING
SP17 Pemasangan 1 m2 batako 1 : 5
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.3200 - -
Tukang Batu L.12 OH 0.1000 - -
Kepala Tukang L.04 OH 0.0100 - -
Mandor L.02 OH 0.0150 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Batako Bh 12.500 - -
Semen Portlandd Kg 7.500 - -
Pasir pasang M3 0.027 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

SP18 Pemasangan 1 m² dinding bata merah (5x11x12) cm tebal ½ batu campuran 1 SP : 2 PP


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.3000 - -
Tukang batu L.12 OH 0.1000 - -
Kepala Tukang L.04 OH 0.0100 - -
Mandor L.02 OH 0.0150 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Bata merah biji 70.0000 - -
Semen Portlandd kg 18.9500 - -
Pasir pasang m³ 0.0380 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
SP19 Pemasangan 1 m² dinding bata merah (5x11x12) cm tebal ½ batu campuran 1 SP : 4 PP
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.3000 - -
Tukang batu L.12 OH 0.1000 - -
Kepala Tukang L.04 OH 0.0100 - -
Mandor L.02 OH 0.0150 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Bata merah biji 70.0000 - -
Semen Portlandd kg 11.5000 - -
Pasir pasang m³ 0.0430 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

SP20 Pemasangan 1 m² dinding bata merah (5x11x12) cm tebal ½ batu campuran 1 SP : 5 PP


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.3000 - -
Tukang batu L.12 OH 0.1000 - -
Kepala Tukang L.04 OH 0.0100 - -
Mandor L.02 OH 0.0150 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Bata merah biji 70.0000 - -
Semen Portlandd kg 9.6800 - -
Pasir pasang m³ 0.0450 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
HARGA SATUAN PEKERJAAN PLESTERAN
SP21 Pemasangan 1 m² plesteran 1 SP : 5 PP tebal 15 mm
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.3000 - -
Tukang batu L.12 OH 0.1500 - -
Kepala Tukang L.04 OH 0.0150 - -
Mandor L.02 OH 0.0150 - -
JUMLAH TENAGA KERJA -
B. BAHAN
1. Portland Cement kg 5.1840 - -
2. Pasir Pasang m³ 0.0260 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

SP22 Pemasangan 1 m² plesteran 1 SP : 2 PP tebal 15 mm


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.3000 - -
Tukang batu L.12 OH 0.1500 - -
Kepala Tukang L.04 OH 0.0150 - -
Mandor L.02 OH 0.0150 - -
JUMLAH TENAGA KERJA -
B. BAHAN
1. Portland Cement kg 10.2240 - -
2. Pasir Pasang m³ 0.0200 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
SP23 Pemasangan 1 m² plesteran 1 SP : 4 PP tebal 15 mm
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.3000 - -
Tukang batu L.12 OH 0.1500 - -
Kepala Tukang L.04 OH 0.0150 - -
Mandor L.02 OH 0.0150 - -
JUMLAH TENAGA KERJA -
B. BAHAN
1. Portland Cement kg 6.2400 - -
2. Pasir Pasang m³ 0.0240 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

SP24 Pekerjaan 1m2 acian.


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.200 - -
Tukang Batu L.03 OH 0.100 - -
Kepala Tukang Batu L.03 OH 0.010 - -
Mandor L.04 OH 0.010 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Semen PC Kg 3.250 - -
JUMLAH HARGA BAHAN -
C. PERALATAN

JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
SP25 Pemasangan 1m2 finishing siar pasangan batu kali, campuran 1SP : 2PP.
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.300 - -
Tukang Batu L.03 OH 0.150 - -
Kepala Tukang Batu L.03 OH 0.015 - -
Mandor L.04 OH 0.015 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Semen PC Kg 6.340 - -
Pasir Pasang kg 0.012 - -
JUMLAH HARGA BAHAN -
C. PERALATAN

JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING


SP26 1 M2 PASANGAN KERAMIK KW I 20 X 30
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.9000 - -
Tukang batu L.12 OH 0.4500 - -
Kepala Tukang L.04 OH 0.0450 - -
Mandor L.02 OH 0.0450 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Ubin keramik bh 18.250 - -
Semen Portland Kg 10.400 - -
Pasir pasang M³ 0.045 - -
Semen warna Kg 0.500 - -
JUMLAH HARGA BAHAN -

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
SP27 1 M2 PASANGAN KERAMIK DINDING KW I 20 X 20
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.9000 - -
Tukang batu L.12 OH 0.4500 - -
Kepala Tukang L.04 OH 0.0450 - -
Mandor L.02 OH 0.0450 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Ubin keramik bh 26.250 - -
Semen Portland Kg 9.300 - -
Pasir pasang M³ 0.018 - -
Semen warna Kg 1.940 - -
JUMLAH HARGA BAHAN -

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

SP28 1 M2 PASANGAN KERAMIK DINDING KW I 20 X 25


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.9000 - -
Tukang batu L.12 OH 0.4500 - -
Kepala Tukang L.04 OH 0.0450 - -
Mandor L.02 OH 0.0450 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Ubin keramik bh 22.000 - -
Semen Portland Kg 9.300 - -
Pasir pasang M³ 0.018 - -
Semen warna Kg 1.300 - -
-

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
SP29 1 M2 PASANGAN KERAMIK DINDING KW I 20 X 60
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.9000 - -
Tukang batu L.12 OH 0.4500 - -
Kepala Tukang L.04 OH 0.0450 - -
Mandor L.02 OH 0.0450 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Ubin keramik bh 8.500 - -
Semen Portland Kg 9.300 - -
Pasir pasang M³ 0.018 - -
Semen warna Kg 1.300 - -
-

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

SP30 1 M2 PASANGAN KERAMIK DINDING KW I 60 X 60


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.9000 - -
Tukang batu L.12 OH 0.4500 - -
Kepala Tukang L.04 OH 0.0450 - -
Mandor L.02 OH 0.0450 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Ubin keramik bh 3.1000 - -
Semen Portland Kg 9.800 - -
Pasir pasang M³ 0.045 - -
Semen warna Kg 1.300 - -
-

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
SP31 Pemasangan 1 m2 lantai keramik ukuran 30cm x 30cm
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.260 - -
Tukang batu L.02 OH 0.130 - -
Kepala Tukang L.03 OH 0.013 - -
Mandor L.04 OH 0.013 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Ubin keramik Bh 11.870 - -
Semen Portlan kg 10.000 - -
Pasir pasang M3 0.045 - -
Semen warna kg 1.500 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
` JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

SP32 Pemasangan 1 m² lantai keramik ukuran 40 cm x 40 cm


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.250 - -
Tukang batu L.12 OH 0.125 - -
Kepala Tukang L.04 OH 0.013 - -
Mandor L.02 OH 0.013 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Ubin keramik BH 6.6300 - -
Semen Portland Kg 9.8000 - -
Pasir pasang M³ 0.0450 - -
Semen warna Kg 1.3000 - -
JUMLAH HARGA BAHAN -

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
SP33 Pemasangan 1 m' Plin Keramik 10 x 40 cm
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.090 - -
Tukang batu L.12 OH 0.090 - -
Kepala Tukang L.04 OH 0.009 - -
Mandor L.02 OH 0.005 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Plin Ubin keramik bh 2.6500 - -
Semen Portland Kg 1.1400 - -
Pasir pasang M³ 0.0030 - -
Semen warna Kg 0.1000 - -
JUMLAH HARGA BAHAN -

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

HARGA SATUAN PEKERJAAN BETON

SP34 Pek. Beton 1 Pc : 2 Ps : 3 Krl

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEF
(Rp.) (Rp.)
A TENAGA
Kepala Tukang OH 0.025 - -
Tukang Batu OH 0.250 - -
Pekerja OH 1.650 - -
Mandor OH 0.080 - -
JUMLAH HARGA BAHAN -
B BAHAN
Portland Cement kg 326.0000 - -
Pasir beton kg 0.7600 - -
Kerikil ( Maks 30 mm) kg 1.0290 - -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) -
E. Overhead &Profit (5%) -
F. Harga Satuan Pekerjaan -
SP35 Membuat 1 m3 lantai kerja beton mutu f'c = 9,8 Mpa (K125), slump (12 ± 2) cm, w/c = 0.78
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.6500 - -
Tukang Batu L.02 OH 0.2750 - -
Kepala Tukang L.03 OH 0.0280 - -
Mandor L.04 OH 0.1650 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Semen Portland Kg 276.000 - -
Pasir Beton Kg 828.000 - -
Kerikil (Maks 30mm) Kg 1,012.000 - -
Air Liter 215.000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

SP36 Membuat 1 m3 lantai kerja beton mutu f'c = 14,5 Mpa (K175), slump (12 ± 2) cm, w/c = 0.66
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.6500 - -
Tukang Batu L.02 OH 0.2750 - -
Kepala Tukang L.03 OH 0.0280 - -
Mandor L.04 OH 0.0830 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Semen Portland Kg 326.000 - -
Pasir Beton Kg 760.000 - -
Kerikil (Maks 30mm) Kg 1,029.000 - -
Air Liter 215.000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
SP37 Membuat 1m3 beton mutu fc =19,3 MPa(K225),slump ( 12 ± 2) cm, w/c = 0,58
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.650 - -
Tukang Batu L.02 OH 0.275 - -
Kepala Tukang L.03 OH 0.028 - -
Mandor L.04 OH 0.083 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Semen Portland Kg 371.000 - -
Pasir Beton Kg 698.000 - -
Kerikil (Maks 30mm) Kg 1,047.000 - -
Air Liter 215.000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

SP38 Membuat 1m3 beton mutu fc =26,4 MPa(K300),slump ( 12 ± 2) cm, w/c = 0,52
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
1 Pekerja L.01 OH 1.650 - -
2 Tukang Batu L.02 OH 0.275 - -
3 Kepala Tukang L.03 OH 0.028 - -
4 Mandor L.04 OH 0.083 - -
JUMLAH TENAGA KERJA -
B. BAHAN
1 Semen Portland kg 384.000 - -
2 Pasir Beton kg 692.000 - -
3 Kerikil (Maks 30mm) kg 1,039.000 - -
4 Air Liter 215.000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
SP39 Pemasangan 1 mᶟ pondasi siklop , 60% beton campuran 1SP:2PB:3Kr dan 40% batu belah
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 3.400 - -
Tukang batu L.02 OH 0.850 - -
Kepala Tukang L.03 OH 0.085 - -
Mandor L.04 OH 0.170 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Batu belah mᶟ 0.480 - -
Pasir beton mᶟ 0.312 - -
Semen portland Kg 194.000 - -
Kerikil mᶟ 0.468 - -
Besi Beton Kg 126.000 - -
Kawat Beton Kg 1.800 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

SP40 Pembesian 10 kg dengan besi polos atau besi ulir


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0700 - -
Tukang Besi L.13 OH 0.0700 - -
Kepala Tukang L.5 OH 0.0070 - -
Mandor L.02 OH 0.0040 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Besi beton (polos/ulir) kg 10.5000 - -
Kawat beton kg 0.1500 - -
JUMLAH HARGA BAHAN -
C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
Harga Satuan Pekerjaan/ kg -
SP41 Pemasangan 1 kg baja profil dengan Pengelasan
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.060 - -
Tukang Las Konstruksi L.03 OH 0.060 - -
Kepala Tukang L.03 OH 0.006 - -
Mandor L.04 OH 0.003 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Besi Baja Profil Kg 1.150 - -
kawat las LB 3.2mm Kg 0.006 - -
mesin las/(welder) unit/jam 0.003 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
alat bantu Ls 1.000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

SP42 Pemasangan 1 kg baja profil tanpa Pengelasan


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.060 - -
Tukang Las Konstruksi L.03 OH 0.060 - -
Kepala Tukang L.03 OH 0.006 - -
Mandor L.04 OH 0.003 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Besi Baja Kg 1.150 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
alat bantu Ls 1.000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

SP43 Pemasangan 1 m' pipa besi 50.50.1.8mm


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.108 - 0.00
Tukang besi L.02 OH 0.180 - 0.00
Kepala tukang L.03 OH 0.018 - 0.00
Mandor L.04 OH 0.005 - 0.00
JUMLAH TENAGA KERJA 0.00
B. BAHAN
Pipa galvanis M 1.200 - 0.00
Perlengkapan % 35.000 0.00
JUMLAH HARGA BAHAN 0.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 0.00
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) 0.00
SP44 Pemasangan 1 m2 bekisting untuk sloof
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.5200 - -
Tukang Kayu L.11 OH 0.2600 - -
Kepala Tukang L.03 OH 0.0260 - -
Mandor L.02 OH 0.0260 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Kayu kelas Lokal m3 0.045 - -
Paku 5 - 10 cm kg 0.300 - -
Minyak bekisting/solar Liter 0.100 - -
JUMLAH HARGA BAHAN -
C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
G Harga Satuan Pekerjaan (D+E)/ 2 X PAKAI -

SP45 Pemasangan 1 m2 bekisting untuk kolom


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.6600 - -
Tukang Kayu L.11 OH 0.3300 - -
Kepala Tukang L.03 OH 0.0330 - -
Mandor L.02 OH 0.0330 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Kayu kelas Lokal m3 0.040 - -
Paku 5 - 12 cm kg 0.400 - -
Minyak bekisting Liter 0.200 - -
Balok kayu kelas III/Seseh m3 0.015 - -
Plywood tebal 9 mm Lbr 0.350 - -
DolkenKayu Ø8 - 10cm Panjang 4m btg 2.000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
G. Harga Satuan Pekerjaan (D+E)/ HARGA 2 X PAKAI -
SP46 Pemasangan 1 m2 bekisting untuk balok
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.6600 - -
Tukang Kayu L.11 OH 0.3300 - -
Kepala Tukang L.03 OH 0.0330 - -
Mandor L.02 OH 0.0330 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Kayu kelas Lokal m3 0.040 - -
Paku 5 - 12 cm kg 0.400 - -
Minyak bekisting Liter 0.200 - -
Balok kayu kelas III/Seseh m3 0.018 - -
Plywood tebal 9 mm Lbr 0.350 - -
DolkenKayu Ø8 - 10cm Panjang 4m btg 2.000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
G Harga Satuan Pekerjaan (D+E)/ HARGA 2 X PAKAI -

SP47 Pemasangan 1m2 bekisting untuk lantai


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
1 Pekerja L.01 OH 0.660 - -
2 Tukang Kayu L.02 OH 0.330 - -
3 Kepala Tukang L.03 OH 0.033 - -
4 Mandor L.04 OH 0.033 - -
JUMLAH TENAGA KERJA -
B. BAHAN
1 Kayu kelas Lokal m3 0.040 - -
2 Paku 5 - 10cm kg 0.400 - -
3 Minyak Bekisting Liter 0.200 - -
4 Balok kayu kelas III/Seseh m3 0.015 - -
5 Plywood Tebal 9mm Lbr 0.350 - -
6 DolkenKayu Ø8 - 10cm Panjang 4m btg 4.000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
G Harga Satuan Pekerjaan (D+E)/ HARGA 2 X PAKAI -
SP48 Pemasangan 1m2 bekisting untuk dinding
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
1 Pekerja L.01 OH 0.660 - -
2 Tukang Kayu L.02 OH 0.330 - -
3 Kepala Tukang L.03 OH 0.033 - -
4 Mandor L.04 OH 0.033 - -
JUMLAH TENAGA KERJA -
B. BAHAN
1 Kayu kelas Lokal m3 0.030 - -
2 Paku 5 - 10cm kg 0.400 - -
3 Minyak Bekisting Liter 0.200 - -
4 Balok kayu kelas III/Seseh m3 0.020 - -
5 Plywood Tebal 9mm Lbr 0.350 - -
6 DolkenKayu Ø8 - 10cm Panjang 4m btg 3.000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
G Harga Satuan Pekerjaan (D+E)/ HARGA 2 X PAKAI -

SP49 Pemasangan 1m2 bekisting untuk tangga


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
1 Pekerja L.01 OH 0.660 - -
2 Tukang Kayu L.02 OH 0.330 - -
3 Kepala Tukang L.03 OH 0.033 - -
4 Mandor L.04 OH 0.033 - -
JUMLAH TENAGA KERJA -
B. BAHAN
1 Kayu kelas Lokal m3 0.030 - -
2 Paku 5 - 10cm kg 0.400 - -
3 Minyak Bekisting Liter 0.150 - -
4 Balok kayu kelas III/Seseh m3 0.015 - -
5 Plywood Tebal 9mm Lbr 0.350 - -
6 DolkenKayu Ø8 - 10cm Panjang 4m btg 2.000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
G Harga Satuan Pekerjaan (D+E)/ HARGA 2 X PAKAI -
SP50 1 m3 Beton Sloof, balok dan Kolom Praktis
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA

JUMLAH TENAGA KERJA -


B. BAHAN
1 Beton K300 m3 1.000 - -
2 Besi Beton kg 100.000 - -
3 Begesting m1 10.000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

SP51 1 m' Balok Beton Bertulang 10 x 15 cm


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.2970 - -
Tukang Batu L.12 OH 0.0330 - -
Tukang Kayu L.11 OH 0.0330 - -
Tukang Besi L.13 OH 0.0330 - -
Kepala Tukang L.05 OH 0.0100 - -
Mandor L.02 OH 0.0150 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Kayu kelas III m3 0.0030 - -
Paku Biasa 2" - 5" kg 0.0200 - -
Minyak Begesting/solar ltr 0.1500 - -
Besi Beton (polos/ulir) kg 3.6000 - -
Kawat Beton kg 0.0500 - -
Semen Portland kg 5.5000 - -
Pasir Beton kg 0.0090 - -
Koral Beton kg 0.0150 - -
JUMLAH HARGA BAHAN -
C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
SP52 1 m' Kolom Beton Bertulang 11 x 11 cm
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.1800 - -
Tukang Batu L.12 OH 0.0200 - -
Tukang Kayu L.11 OH 0.0200 - -
Tukang Besi L.13 OH 0.0200 - -
Kepala Tukang L.05 OH 0.0060 - -
Mandor L.02 OH 0.0090 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Kayu kelas III m3 0.0020 - -
Paku Biasa 2" - 5" kg 0.0100 - -
Besi Beton (polos/ulir) kg 3.0000 - -
Kawat Beton kg 0.4500 - -
Semen Portland kg 4.0000 - -
Pasir Beton kg 0.0060 - -
Koral Beton kg 0.0090 - -
JUMLAH HARGA BAHAN -
C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

SP53 Membuat 1m3 beton Pengeresek


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 2.650 - -
Tukang Batu L.02 OH 1.000 - -
Kepala Tukang L.03 OH 0.100 - -
Mandor L.04 OH 0.040 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Semen Portland kg 125.000 - -
Pasir Beton m3 0.544 - -
Kerikil (Maks 30mm) m3 0.970 - -
Air Liter 215.000 -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
SP54 1 M2 Pasang Paving Block 20 x 20 cm tebal 6 cm K225, (+ urugan pasir = 5 cm)
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
1 Pekerja L.01 OH 0.2500 - -
2 Tukang Batu L.02 OH 0.5000 - -
3 Kepala Tukang Batu L.03 OH 0.0250 - -
4 Mandor L.04 OH 0.0013 - -
JUMLAH TENAGA KERJA -
B. BAHAN
1 Paving Block m2 1.0100 - -
2 Pasir Beton m3 0.0500 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Peralatan % 10.0000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

SP55 1 M2 Pasang Paving Block 20 x 20 cm tebal 8 cm K225, (+ urugan pasir = 5 cm)


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
1 Pekerja L.01 OH 0.2500 - -
2 Tukang Batu L.02 OH 0.5000 - -
3 Kepala Tukang Batu L.03 OH 0.0250 - -
4 Mandor L.04 OH 0.0013 - -
JUMLAH TENAGA KERJA -
B. BAHAN
1 Paving Block m2 1.0100 - -
2 Pasir Beton m3 2.0700 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Peralatan % 10.0000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
SP56 1 M' pasang Buis Beton D 100 cm
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
1 Pekerja L.01 OH 0.3200 - -
2 Tukang Batu L.02 OH 0.0800 - -
4 Mandor L.04 OH 0.0800 - -
JUMLAH TENAGA KERJA -
B. BAHAN
1 Buis Beton bh 2.0000 - -
Pasir pasang m3 0.0180 - -
Portland Cement kg 0.3000 0.00 -
JUMLAH HARGA BAHAN -
C. PERALATAN
Alat bantu Ls 1.0000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

SP57 1 m' Pekerjaan Memasang Beton Pracetak Saluran Type U-Ditch 50x50x120 cm, K350
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
1 Pekerja L.01 OH 0.8000 - -
2 Tukang Batu L.02 OH 0.2000 - -
3 Mandor L.04 OH 0.1000 - -
JUMLAH TENAGA KERJA -
B. BAHAN
1 U - Ditch 30x30x120 cm K350 unit 0.8330 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
HARGA SATUAN PEKERJAAN KAYU
SP58 Pemasangan 1 m³ kusen pintu kamper
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 7.000 - -
Tukang Kayu L.03 OH 21.000 - -
Kepala Tukang Kayu L.03 OH 2.100 - -
Mandor L.04 OH 0.350 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Balok Kayu Kamper m³ 1.100 - -
Paku 10 cm Kg 1.250 - -
Lem Kayu Kg 1.000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

SP59 Pemasangan 1 m kusen pintu aluminium


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.043 - -
Tukang Kayu L.03 OH 0.043 - -
Kepala Tukang Kayu L.03 OH 0.004 - -
Mandor L.04 OH 0.002 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Profil Alluminium m 1.100 - -
Skrup Fixer buah 2.000 - -
Sealant tube 0.060 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
SP60 Pengadaan dan Pemasangan 1 m' Kusen Baja CNP
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.700 - -
Tukang Kayu L.03 OH 0.700 - -
Kepala Tukang Kayu L.03 OH 0.070 - -
Mandor L.04 OH 0.036 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Baja Profil kg 16.160 - -
Elektroda (kawat Las) kg 0.036 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

SP61 Pemasangan 1 m2 Pintu Plat 2 Sisi Tengah diisi Glass Woll


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.600 - -
Mandor OH 0.010 - -
Tukang Besi/ Las OH 1.600 - -
Kepala Tukang Las OH 0.024 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Kawat las LB 3.2 mm kg 0.044 - -
Plat Baja Tebal 1,2 mm Lbr 0.730 - -
Baja Profil kg 25.600 - -
Glass Wool M2 1.100 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Mesin Las ( Welder ) unit/jam 2.240 - -
Alat bantu unit/hr 1.000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
SP62 Pemasangan 1 m2 pintu kaca frame aluminium
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.085 - -
Tukang Kayu L.03 OH 0.085 - -
Kepala Tukang Kayu L.03 OH 0.009 - -
Mandor L.04 OH 0.005 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Pintu Aluminium m 4.400 - -
Profil Kaca m2 4.500 - -
Sealant tube 0.060 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

SP63 Pembuatan dan pemasangan 1 m² jendela kaca, kayu klas I/Kamper


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.8000 - -
Tukang kayu L.11 OH 2.4000 - -
Kepala Tukang L.03 OH 0.2400 - -
Mandor L.02 OH 0.0400 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Papan kayu M³ 0.0240 - -
Kaca Bening 3 mm M2 0.800 - -
Lem kayu Kg 0.3000 - -
JUMLAH HARGA BAHAN -

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
SP64 Pembuatan dan pemasangan 1 m² pintu Panel Kayu Klas I /kayu kamper
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.000 - -
Tukang kayu L.11 OH 3.000 - -
Kepala Tukang L.03 OH 0.300 - -
Mandor L.02 OH 0.050 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Papan kayu M³ 0.064 - -
Lem kayu Kg 0.500 - -
JUMLAH HARGA BAHAN -

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

SP65 Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas I tertutup (lebar sampai 90 cm)
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
pekerjaan L.01 OH 0.700 - -
tukang kayu L.03 OH 2.100 - -
kepala tukang L.03 OH 0.210 - -
mandor L.04 OH 0.035 - -
JUMLAH TENAGA KERJA -
B. BAHAN
papan kayu m3 0.025 - -
paku 1cm-2.5cm kg 0.030 - -
lem kayu kg 0.500 - -
plywood tebal 4 mm ukuran (90 x 220) cm lembar 1.000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

SP66 Pemasangan 1 m² kaca tebal 5 mm


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0150 - -
Tukang kayu L.11 OH 0.1500 - -
Kepala Tukang L.03 OH 0.0150 - -
Mandor L.02 OH 0.0008 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Kaca tebal 5 mm Bh 1.1000 - -
Sealant Kg 0.0500 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)
SP67 Pemasangan 1 m² langit-langit Kalsiboard ukuran (1220 x 2440 x 8) mm, berikut rangka hollow
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.1000 - -
Tukang kayu L.11 OH 0.0500 - -
Kepala Tukang L.03 OH 0.0050 - -
Mandor L.02 OH 0.0050 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Kalsiboard 1220x2440x8mm Lembar 0.3640 - -
Paku skrup Kg 0.1100 - -
Suspention rod bracket 220 Bh 2.2000 - -
Suspention rod 226 Bh 2.2000 - -
Suspention clip 223 Bh 2.2000 - -
Top cross rail 200 m' 2.5000 - -
Furing channel conector clip 210 Bh 3.1250 - -
Furing channel 204 m' 2.5000 - -
Sekrup type S-25 mm Bh 2.0000 - -
JUMLAH HARGA BAHAN -

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

SP68 Pemasangan 1 m² langit-langit lambersering


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.8000 - -
Tukang kayu L.02 OH 0.8000 - -
Kepala Tukang L,03 OH 0.0800 - -
Mandor L,04 OH 0.0400 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Kayu Papan m3 0.0150 - -
Paku Tripleks Kg 0.0100 - -
JUMLAH HARGA BAHAN -

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
SP69 Pemasangan 1 m' list gypsum
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0300 - -
Tukang kayu L.11 OH 0.0300 - -
Kepala Tukang L.03 OH 0.0030 - -
Mandor L.02 OH 0.0030 - -
JUMLAH TENAGA KERJA -
B. BAHAN
List gypsum m 1.0500 - -
Compound Kg 0.0100 - -
JUMLAH HARGA BAHAN -

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

SP70 Pemasangan 1 m' list plafond


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0500 - -
Tukang kayu L.02 OH 0.0500 - -
Kepala Tukang L.03 OH 0.0050 - -
Mandor L.04 OH 0.0030 - -
JUMLAH TENAGA KERJA -
B. BAHAN
List kayu profil m 1.0500 - -
Paku Kg 0.0100 - -
JUMLAH HARGA BAHAN -

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
HARGA SATUAN PEKERJAAN PENUTUP ATAP
SP71 Pemasangan 1 m2 genteng karang pilang
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.1500 - -
Tukang kayu L.03 OH 0.0750 - -
Kepala Tukang L.11 OH 0.0080 - -
Mandor L.15 OH 0.0080 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Genteng goodyear Bh 25.0000 - -
JUMLAH HARGA BAHAN -

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

SP72 Pemasangan 1 m' bubung genteng karang pilang


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.4000 - -
Tukang kayu L.03 OH 0.2000 - -
Kepala Tukang L.11 OH 0.0200 - -
Mandor L.15 OH 0.0020 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Genteng bubung Bh 5.0000 - -
Semen Portland Kg 8.0000 - -
Pasir pasang M³ 0.0320 - -
JUMLAH HARGA BAHAN -

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
SP73 Pekerjaan pasang 1 bh Murda
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.4000 - -
Mandor L.15 OH 0.0020 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Murda Bh 1.0000 - -
JUMLAH HARGA BAHAN -

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

SP73 Pekerjaan pasang 1 bh Ikut Celedu'


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.4000 - -
Mandor L.15 OH 0.0020 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Ikut Celedu Bh 1.0000 - -
JUMLAH HARGA BAHAN -

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

SP74 Pemasangan 1 m2 atap genteng


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
pekerja L.01 OH 0.150 - -
tukang kayu L.03 OH 0.075 - -
kepala tukang L.11 OH 0.008 - -
mandor L.15 OH 0.008 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Genteng keramik glasur bh 25.000 - -

JUMLAH HARGA BAHAN -


C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
SP75 Pemasangan 1 m2 bubungan
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
pekerja L.01 OH 0.400 - -
tukang kayu L.03 OH 0.200 - -
kepala tukang L.11 OH 0.020 - -
mandor L.15 OH 0.002 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Genteng keramik glasur bh 5.000 - -
Semen Portlan kg 8.000 - -
Pasir Pasang m3 0.032 - -

JUMLAH HARGA BAHAN -


C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
SP76 1 m3 pekerjaan kuda-kuda
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 4.000 - -
Tukang kayu L.11 OH 12.000 - -
Kepala Tukang L.03 OH 1.200 - -
Mandor L.02 OH 0.200 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Balok Kayu M³ 1.100 - -
Besi Strip kg 15.000 - -
Paku Kg 5.600 - -
JUMLAH HARGA BAHAN -

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

SP77 1 m2 pekerjaan usuk dan reng


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.100 - -
Tukang kayu L.11 OH 0.100 - -
Kepala Tukang L.03 OH 0.007 - -
Mandor L.02 OH 0.008 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Usuk Kayu Kamper M³ 0.011 - -
Reng Kayu Kamper M³ 0.008 - -
Paku reng Kg 0.150 - -
Paku usuk Kg 0.100 - -
JUMLAH HARGA BAHAN -

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
SP78 1 m' tatab kayu kelas 1/kamper
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.050 - -
Tukang kayu L.11 OH 0.100 - -
Kepala Tukang L.03 OH 0.010 - -
Mandor L.02 OH 0.003 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Kayu Kamper Papan 3/20 M³ 0.004 - -
Paku Reng Kg 0.050 - -
JUMLAH HARGA BAHAN -

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

SP79 1 M' Pekerjaan Listplank Kayu Kelas I/kamper 2x3/20cm


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.1000 - -
Tukang kayu L.11 OH 0.2000 - -
Kepala Tukang L.03 OH 0.0200 - -
Mandor L.02 OH 0.0050 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Kayu Kamper Papan 3/20 cm M³ 0.022 - -
Paku 10 Cm Kg 0.200 - -
JUMLAH HARGA BAHAN -

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
SP80 1 M' Pekerjaan Listplank Kayu Kelas I/kamper 2/20cm
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.1100 - -
Tukang kayu L.11 OH 0.2200 - -
Kepala Tukang L.03 OH 0.0220 - -
Mandor L.02 OH 0.0050 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Kayu Kamper Papan 3/20 cm M³ 0.005 - -
Paku 10 Cm Kg 0.100 - -
JUMLAH HARGA BAHAN -

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
HARGA SATUAN PEKERJAAN PENGECATAN
SP81 Pengecatan 1 M² tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup setara vinilex)
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0200 - -
Tukang cat L.14 OH 0.0630 - -
Kepala tukang L.06 OH 0.0063 - -
Mandor L.02 OH 0.0030 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Plamuur Kg 0.1000 - -
Cat dasar Kg 0.1000 - -
Cat penutup setara vinilex Kg 0.2600 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

SP82 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.070 - -
Tukang cat L.02 OH 0.105 - -
Kepala tukang L.03 OH 0.004 - -
Mandor L.04 OH 0.003 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Cat Manie Kg 0.200 - -
Plamuur Kg 0.150 - -
Cat dasar Kg 0.170 - -
Cat penutup Kg 0.350 - -
Kuas bh 0.010 - -
Pengencer Kg 0.030 - -
Ampelas Lbr 0.200 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
SP83 Pelaburan 1 M² bidang kayu dengan politur
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0400 - -
Tukang cat L.14 OH 0.0600 - -
Kepala tukang L.06 OH 0.0160 - -
Mandor L.02 OH 0.0030 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Politur Ltr 0.1500 - -
Politur jadi Ltr 0.3720 - -
Amplas Lbr 2.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

SP84 Pekerjaan 1M2 Cat Meni Besi


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0200 - -
Tukang cat L.14 OH 0.2000 - -
Kepala tukang L.06 OH 0.0200 - -
Mandor L.02 OH 0.0025 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Cat Meni kg 0.1000 - -
Cat Besi Anti Karat kg 0.2500 - -
Kuas bh 0.0100 - -
Amplas Lbr 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
SP85 Pekerjaan 1 m² waterproofing
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.025 - -
Tukang cat L.02 OH 0.083 - -
Kepala Tukang Cat L.03 OH 0.008 - -
Mandor L.04 OH 0.003 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Waterproofing kg 1.000 - -
JUMLAH HARGA BAHAN -

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

SP86 Pekerjaan 1 m' waterstop lebar 230 mm - 320 mm


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.080 - -
Tukang Batu L.02 OH 0.040 - -
Kepala Tukang L.03 OH 0.004 - -
Mandor L.04 OH 0.004 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Waterstop lebar 230 mm - 320 mm kg 1.050 - -
JUMLAH HARGA BAHAN -

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
HARGA SATUAN PENGGANTUNG & PENGUNCI
SP87 Pemasangan 1 buah engsel pintu
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0150 - -
Tukang kayu L.11 OH 0.1500 - -
Kepala Tukang L.03 OH 0.0150 - -
Mandor L.02 OH 0.0008 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Engsel pintu Psg 1.0000 - -
JUMLAH HARGA BAHAN -

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

SP88 Pemasangan 1 buah engsel pintu baja AS 1 ''


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0150 - -
Tukang kayu L.11 OH 0.1500 - -
Kepala Tukang L.03 OH 0.0150 - -
Mandor L.02 OH 0.0008 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Engsel pintu Psg 1.0000 - -
JUMLAH HARGA BAHAN -

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
SP89 Pemasangan 1 buah engsel jendela kupu-kupu
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0100 - -
Tukang kayu L.11 OH 0.1000 - -
Kepala Tukang L.03 OH 0.0100 - -
Mandor L.02 OH 0.0005 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Engsel nilon Psg 1.0000 - -
JUMLAH HARGA BAHAN -

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

SP90 Pemasangan 1 buah Grendel Tanam Pintu Baja


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.100 - -
Tukang kayu L.11 OH 0.010 - -
Kepala Tukang L.03 OH 0.010 - -
Mandor L.02 OH 0.001 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Grendel Pintu Bh 1.0000 - -
JUMLAH HARGA BAHAN -

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
SP91 Pemasangan 1 buah kait angin
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0150 - -
Tukang kayu L.11 OH 0.1500 - -
Kepala Tukang L.03 OH 0.0150 - -
Mandor L.02 OH 0.0080 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Kait angin Bh 1.0000 - -
JUMLAH HARGA BAHAN -

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

SP92 Pemasangan 1 buah Grendel Pintu


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.100 - -
Tukang kayu L.11 OH 0.010 - -
Kepala Tukang L.03 OH 0.010 - -
Mandor L.02 OH 0.001 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Grendel Pintu Bh 1.0000 - -
JUMLAH HARGA BAHAN -

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
SP93 Pemasangan 1 m2 rolling door allumunium
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 1.000 - -
Tukang Khusus Alumunium L.03 OH 1.000 - -
Kepala Tukang L.03 OH 0.100 - -
Mandor L.04 OH 0.050 - -
JUMLAH TENAGA KERJA -
B. BAHAN
rolling door allumunium m2 1.000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN

JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

SP94 Pemasangan 1 buah Handle & Kunci Pintu


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.005 - -
Tukang kayu L.11 OH 0.500 - -
Kepala Tukang L.03 OH 0.050 - -
Mandor L.02 OH 0.003 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Handle dan Kunci Pintu Bh 1.0000 - -
JUMLAH HARGA BAHAN -

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

PEKERJAAN PARAS STYLE BALI


SP95 Pemasangan 1 m2 dinding Pepalihan batu tempel paras klating
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.500 - -
Tukang batu L.02 OH 1.500 - -
Kepala tukang L.03 OH 0.150 - -
Mandor L.04 OH 0.015 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Paras Klating m2 1.100 - -
Semen portlan Kg 11.750 - -
Pasir pasang M3 0.035 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
SP96 Pemasangan 1 m' dinding Penyengker Style Bali Paras Sangsit 5.030
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 7.545 - -
Tukang batu L.02 OH 7.545 - -
Kepala tukang L.03 OH 0.755 - -
Mandor L.04 OH 0.075 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Batu Candi bh 155.256 - -
Semen portlan Kg 59.103 - -
Pasir pasang M3 0.176 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

SP100 Pemasangan 1 unit Paduraksa Style Bali Paras Sangsit 6.240


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 9.360 - -
Tukang batu L.02 OH 9.360 - -
Kepala tukang L.03 OH 0.936 - -
Mandor L.04 OH 0.094 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Pars Sangsit m2 182.707 - -
Semen portlan Kg 73.320 - -
Pasir pasang M3 0.218 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
SP101 Pemasangan 1 unit Candi Bentar Style Bali Paras Sangsit 98.800
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 148.200 - -
Tukang batu L.02 OH 148.200 - -
Kepala tukang L.03 OH 14.820 - -
Mandor L.04 OH 1.482 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Paras Sangsit m2 118.560 - -
Semen portlan Kg 1,160.900 - -
Pasir pasang M3 3.458 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

SP102 Pemasangan 1 m2 pasangan bata dan paras gosok 78.000


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.700 - -
Tukang batu L.02 OH 0.350 - -
Kepala tukang L.03 OH 0.035 - -
Mandor L.04 OH 0.035 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Bata Gosok m2 1.200 - -
Semen portlan Kg 5.000 - -
Pasir pasang M3 0.025 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
SP103 Pemasangan 1 m2 pasangan batu candi 78.000
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.700 - -
Tukang batu L.02 OH 0.350 - -
Kepala tukang L.03 OH 0.035 - -
Mandor L.04 OH 0.035 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Batu Candi m2 1.200 - -
Semen portlan Kg 5.000 - -
Pasir pasang M3 0.025 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

SP104 Pemasangan 1 m2 pasangan batu bilah random 78.000


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.200 - -
Tukang batu L.02 OH 1.000 - -
Kepala tukang L.03 OH 0.100 - -
Mandor L.04 OH 0.012 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Batu Bilah Random m2 1.200 - -
Semen portlan Zak 0.210 - -
Pasir pasang M3 0.050 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
SP105 Pemasangan 1 m2 pasangan batu paras sangsit 78.000
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.000 - -
Tukang batu L.02 OH 1.000 - -
Kepala tukang L.03 OH 0.100 - -
Mandor L.04 OH 0.010 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Batu paras sangsit bh 24.400 - -
Semen portlan kg 14.150 - -
Pasir pasang M3 0.050 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
SP106 Penggalian 1 mᶟ Tanah Berbatu
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0357 - -
Mandor OH 0.0179 - -
JUMLAH TENAGA KERJA -
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN
Compressor Jam 0.1000 - -
Jack Hammer Jam 0.1000 - -
Excavator Jam 0.1000 - -
Dump Truck Jam 0.2463 - -
Alat bantu Ls 1.0000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

SP107 Penggalian 1 mᶟ Tanah Keras


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.0000 - -
Mandor OH 0.0320 - -
JUMLAH TENAGA KERJA -
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

SP108 Pengukuran dan Pematokan/m'


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.0000 - -
Juru Ukur/Surveyor OH 3.0000 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Patok Beton CP BH 1.0000 - -
Patok Beton BM BH 1.0000 - -
Patok Kayu BH 10.0000 - -
Buku Ukur LS 0.0200 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Alat Ukur Theodolith unit/hr 0.5000 - -
Alat Ukur Waterpass unit/hr 0.5000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan 500 m (D+E) -
G. Harga Satuan Pekerjaan / m -
SP109 Test Pit
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA

JUMLAH TENAGA KERJA -


B. BAHAN
Galian Tanah Keras M3 0.2000 - -
Galian tanah berbatu/cadas M3 0.3000 - -
Galian tanah biasa M3 2.0000 - -
Urugan pilihan M3 1.0000 - -
Urugan tanah kembali dipadatkan M3 1.0000 - -
Timbunan agregat B M3 0.3000 - -
Timbunan Agregat A M3 0.2000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Alat Bantu Ls 1.0000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan 500 m (D+E) -

SP110 Penyediaan lokasi pembuangan hasil galian


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA

JUMLAH TENAGA KERJA -


B. BAHAN
Estimasion area of soil disposal 5,000 m2 5,000.0000 - -
- Fee for soil disposal
JUMLAH HARGA BAHAN -
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan 500 m (D+E) -
SP111 Pembersihan semua fasilitas sementara, pemindahan mesin/peralatan, material sisa dan sebagainya
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA

JUMLAH TENAGA KERJA -


B. BAHAN
- Temporary office m2 150.0000 - -
- Workshop m2 200.0000 - -
- Stocyard m2 2,000.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan 500 m (D+E) -
SP112 Memasang Floor Drain / bh
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0100 - -
Tukang Batu OH 0.1000 - -
Kepala Tukang OH 0.0100 - -
Mandor OH 0.0050 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Floor Drain Bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

SP113 Memasang Kran Air / bh


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0100 - -
Tukang Batu OH 0.4000 - -
Kepala Tukang OH 0.0400 - -
Mandor OH 0.0050 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Kran Air Bh 1.0000 - -
Sealtape Bh 0.0250 - -
JUMLAH HARGA BAHAN -
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
SP114 Pekerjaan Septiktank / bh
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA

JUMLAH TENAGA KERJA -


B. BAHAN
Pek. Galian Tanah Biasa m3 3.3100 - -
Pek. Pekerjaan plesteran 1 : 2 (kedap air) m2 10.1900 - -
Pek. Pekerjaan Acian m2 10.1900 - -
Pek. Water profing m2 8.6500 - -
Pek. Pas. Batako m2 10.2600 - -
Pe. Cor Beton Mutu Beton K 225 m3 0.2800 - -
Pek. Kolom 11 cm x 11 cm m' 5.2000 - -
Pek. Sloof Beton 10 cm x 15 cm m' 6.0000 - -
Pek. Ring Beton 10 cm x 15 cm m' 6.0000 - -
Pek. Baja Tulangan kg 58.8800 - -
Pek. Bekisting m2 2.2100 - -
Pek. Pipa Vent Bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
SP115 Pekerjaan Peresapan / bh
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA

JUMLAH TENAGA KERJA -


B. BAHAN
Pek. Galian Tanah Biasa m3 3.3100 - -
Pek. Pekerjaan plesteran 1 : 2 (kedap air) m2 10.1900 - -
Pek. Pekerjaan Acian m2 10.1900 - -
Pek. Water profing m2 8.6500 - -
Pek. Pas. Batako m2 10.2600 - -
Pe. Cor Beton Mutu Beton K 225 m3 0.2800 - -
Pek. Kolom 11 cm x 11 cm m' 5.2000 - -
Pek. Sloof Beton 10 cm x 15 cm m' 6.0000 - -
Pek. Ring Beton 10 cm x 15 cm m' 6.0000 - -
Pek. Baja Tulangan kg 58.8800 - -
Pek. Bekisting m2 2.2100 - -
PVC Water dia 4" m3 2.0000 - -
Urugan pasir m3 0.0700 - -
Lapisan ijuk m3 0.1500 - -
Urugan Kerikil m3 0.8900 - -
Urugan Pecahan Bata porus Ls 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

SP116 Memasang Wastafel / bh


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L,01 OH 1.2000 - -
Tukang Batu L,02 OH 1.4500 - -
Kepala Tukang L,03 OH 0.1500 - -
Mandor L,04 OH 0.0600 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Wastafel Unit 1.2000 - -
Semen Kg 6.0000 - -
Pasir Pasang M3 0.0100 - -
Perlengkapan % 12.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
SP117 Memasang Closet Duduk / bh
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L,01 OH 3.3000 - -
Tukang Batu L,02 OH 1.1000 - -
Kepala Tukang L,03 OH 0.0100 - -
Mandor L,04 OH 0.1600 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Closet Duduk Unit 1.0000 - -
Perlengkapan Ls 0.0600 - -
JUMLAH HARGA BAHAN -
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

SP118 Memasang 1 m2 stepnozing


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L,01 OH 0.090 - -
Tukang Batu L,02 OH 0.090 - -
Kepala Tukang L,03 OH 0.009 - -
Mandor L,04 OH 0.005 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Plin Ubin keramik bh 2.6500 - -
Semen Portland Kg 1.1400 - -
Pasir pasang M³ 0.0030 - -
Semen warna Kg 0.1000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
SP119 Pengangkutan tanah dari temporary site (diisi dgn excavator), l = 2 km
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA

JUMLAH TENAGA KERJA -


B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN
Dump Truck 4 ton jam 0.2128 - -
Tructor Shovel 0.60 m3 jam 0.1429 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

SP120 Pengangkutan tanah ke temporary site (diisi dgn excavator), l = 2 km


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA

JUMLAH TENAGA KERJA -


B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN
Dump Truck 4 ton jam 0.2128 - -

JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
SP121 1 m' Pekerjaan Kansteen
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Kansten BH 2 - -
Spesi Beton Pracetak Kansten M2 0.15 - -
Galian Tanah M3 0.1 - -
Pasir Urug M3 0.1 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Kepala Tukang OH 0.12 - -
Pekerja OH 1.2 - -
Mandor OH 0.06 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

SP122 1 m3 membongkar pasangan batu kali


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.500 - -
Mandor L18 OH 0.075 - -
JUMLAH TENAGA KERJA -
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 5.00% x D -
F. Harga Satuan Pekerjaan (D+E) -

SP123 Pek. Pemasangan Tiang Lampu Jalan Single


KOEF/ HARGA SATUAN JUMLAH HARGA
NO URAIAN SATUAN
VOLUME (Rp.) (Rp.)

1 Pekerjaan Galian Tanah m3 0.064 - -


4 Pekerjan Beton 1 : 2 : 3 m3 0.025 - -
Pengadaan dan Pemasangan Tiang lampu
3 m 1.100 - -
PJU 6-7m Single
4 Pengecatan Meni Besi m2 0.019 - -

D. Jumlah (A+B+C) -
E. Overhead &Profit (5%) -
F. Harga Satuan Pekerjaan -

SP124 Pek. Pemasangan Tiang Lampu Jalan Double


KOEF/ HARGA SATUAN JUMLAH HARGA
NO URAIAN SATUAN
VOLUME (Rp.) (Rp.)
1 Pekerjaan Galian Tanah m3 0.064 - -
4 Pekerjan Beton 1 : 2 : 3 m3 0.025 - -
Pengadaan dan Pemasangan Tiang Lampu
5 m 1.100 - -
Jalan Double
8 Pengecatan Meni Besi m2 0.019 - -

D Jumlah (A+B+C) -
Overhead &Profit (5%) -
Harga Satuan Pekerjaan -
HARGA DASAR SATUAN UPAH
HARGA HARGA
No. URAIAN KODE SATUAN YG DIGUNAKAN KETERANGAN
( Rp.) ###
###
1. Pekerja (L01) Jam ###
2. Tukang (L02) Jam ###
3. Mandor (L03) Jam ###
4. Operator (L04) Jam ###
5. Pembantu Operator (L05) Jam ###
6. Sopir / Driver (L06) Jam ###
7. Pembantu Sopir / Driver (L07) Jam ###
8. Mekanik (L08) Jam ###
9. Pembantu Mekanik (L09) Jam ###
10. Kepala Tukang (L10) Jam ###
###
###
###
###
DAFTAR
HARGA DASAR SATUAN BAHAN
###
HARGA
No. URAIAN KODE SATUAN SATUAN KETERANGAN
( Rp.) ###
1 Lolos screen1 ukuran ( 0 - 5) M3 Base Camp
2 Lolos screen2 ukuran ( 0 - 5) M3 Base Camp
3 Lolos screen2 ukuran ( 5 - 9,5) M3 Base Camp
4 Lolos screen2 ukuran ( 9.5 - 19,0) M3 Base Camp
5 Filler M05 Kg Proses/Base Camp
6 Batu Belah / Kerakal M06 M3 Lokasi Pekerjaan
7 Gravel M07 M3 Base Camp
8 Aspal M10 KG Base Camp
9 Kerosen / Minyak Tanah M11 LITER Base Camp
###
###
Analisa EI-611a

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROP / KAB / KODYA : Bali


ITEM PEMBAYARAN NO. : 6.1 (1)(a) PERKIRAAN VOL. PEK. : 0
JENIS PEKERJAAN : Lapis Resap Pengikat - Aspal Cair TOTAL HARGA (Rp.) : 0
SATUAN PEMBAYARAN : Liter % THD. BIAYA PROYEK : 0

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.0021 - -


2. Mandor (L03) Jam 0.0004 - -

JUMLAH HARGA TENAGA -

B. BAHAN

1. Aspal (M10) Kg 0.679 - -


2. Kerosene (M11) liter 0.3708 - -

JUMLAH HARGA BAHAN -

C. PERALATAN

1. Asp. Distributor E41 Jam 0.0002 - -


2. Compressor E05 Jam 0.0002 - -

JUMLAH HARGA PERALATAN -

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) -


E. OVERHEAD & PROFIT 5% x D -
F. HARGA SATUAN PEKERJAAN ( D + E ) -
Note : 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-612a

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROP / KAB / KODYA : Bali


ITEM PEMBAYARAN NO. : 6.1 (2)(a) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Lapis Perekat - Aspal Cair TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Liter % THD. BIAYA PROYEK :

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.0021 - -


2. Mandor (L03) Jam 0.0004 - -

JUMLAH HARGA TENAGA -

B. BAHAN

1. Aspal (M10) Kg 0.8487 - -


2. Kerosene (M11) liter 0.206 - -

JUMLAH HARGA BAHAN -

C. PERALATAN

1. Asp. Distributor E41 Jam 0.0002 - -


2. Compressor E05 Jam 0.0002 - -

JUMLAH HARGA PERALATAN -

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) -


E. OVERHEAD & PROFIT 5% x D -
F. HARGA SATUAN PEKERJAAN ( D + E ) -
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-635a

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROP / KAB / KODYA : Bali


ITEM PEMBAYARAN NO. : 6.3(5a) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Laston Lapis Aus (AC-WC) TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Ton % THD. BIAYA PROYEK :

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.2008 - -


2. Mandor (L03) Jam 0.0201 - -

JUMLAH HARGA TENAGA 0

B. BAHAN

1. Lolos screen2 ukuran ( 5 - 9,5) M3 0.2978 - -


2. Lolos screen2 ukuran ( 0 - 5) M3 0.3492 - -
3 Filler (M05) Kg 10.5000 - -
4 Aspal (M10) Kg 66.9500 - -

JUMLAH HARGA BAHAN -

C. PERALATAN
1. Wheel Loader E15 Jam 0.0096 - -
2. AMP E01 Jam 0.0201 - -
3. Genset E12 Jam 0.0201 - -
4. Dump Truck E09 Jam 0.5589 - -
5. Asp. Finisher E02 Jam 0.0145 - -
6. Tandem Roller E17 Jam 0.0143 - -
7 P. Tyre Roller E18 Jam 0.0061 - -
8 Alat Bantu Ls 1 - -

JUMLAH HARGA PERALATAN -

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) -


E. OVERHEAD & PROFIT 5% x D -
F. HARGA SATUAN PEKERJAAN ( D + E ) -
G. HARGA SATUAN PEKERJAAN +PPN ( F x 110% ) -
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
NAMA PEKERJAAN : Pembangunan SPAM Regional Burana Titab

NO URAIAN SAT VOL WAKTU HARGA SATUAN TOTAL HARGA

1 Penyiapan RK3K terdiri atas:

a Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja Set


Dan
b Pembuatan Kartu Identitas Pekerja (KIP); Or

2 Sosialisasi dan Promosi K3 terdiri atas:


a Induksi K3 (Safety Induction ); khusus untuk pekerja baru Or
c Pelatihan K3;
1. Bekerja di Ketinggian Or
2. K3 Peralatan Konstruksi & Penggunaan bahan Kimia Or
(MSDS)
3. Analysis Keselamatan Pekerjaan Or
4. Perilaku Berbasis Keselamatan (Budaya K3) Or
d Simulasi K3; Or
e Spanduk (banner) ; lb
f Poster; lb
g Papan Informasi K3. bh

3 Alat Pelindung Kerja terdiri atas:


a Tali Keselamatan (Life Line); Ls

4 Alat Pelindung Diri terdiri atas:


a Topi Pelindung (Safety Helmet) ; Bh
b Pelindung Mata (Goggles, Spectacles); psg
c Tameng Muka (Face Shield); bh
d Pelindung Pernafasan Dan Mulut (Masker); bh
e Sarung Tangan (Safety Gloves); psg
f Sepatu Keselamatan (Safety Shoes); untuk Staf psg
g Sepatu Keselamatan (Rubber Safety Shoes_and toe cap) psg
h Penunjang Seluruh Tubuh (Full Body Harness); bh
i Rompi Keselamatan (Safety Vest); bh
j Celemek (Apron/Coveralls); Bh
k Pelindung Jatuh (Fall Arrester); Bh

5 Fasilitas sarana kesehatan;

a Peralatan P3K (Kotak P3K, Tandu, Tabung Oksigen, Obat ls


Luka, Perban, dll)
b Ruang P3K (Tempat Tidur Pasien); ls
c Peralatan Pengasapan (Fogging) ; bh
d Obat Pengasapan. kali
NO URAIAN SAT VOL WAKTU HARGA SATUAN TOTAL HARGA

6 Rambu- Rambu terdiri atas :


a Rambu Petunjuk; bh
b Rambu Larangan; bh
c Rambu Peringatan; bh
d Rambu Kewajiban; bh
e Rambu Informasi; bh

7 Lain- Lain Terkait Pengendalian Risiko K3


a Alat Pemadam Api Ringan (APAR); 10Kg bh
b Sirine; bh
c Bendera K3; bh
d Jalur Evakuasi (Escape Route ); ls
e Lampu Darurat (Emergency Lamp ); bh
g Pelaporan dan Penyelidikan Insiden. ls
DAFTAR HARGA ASSESORIES STEEL

NO URAIAN SAT HARGA SATUAN


TEE
TEE
1 OD 457.2 X 457.2 bh
2 OD 457,2 X 273 bh ###
3 OD 355,6 x 355,6 bh
4 Dia 6'' bh
5 Dia 4'' bh
6 Dia 3'' bh
7 Dia 2'' bh

Reducer All Flange


1 OD 508X457 bh ###
2 OD 457X355,6 bh
3 OD 406,4X355,6 bh ###
Dia 16'' x 18'' bh
4 Dia 6'' x 4'' bh
5 Dia 6'' x 3'' bh
6 Dia 3'' x 2'' bh

WALL PIPE
1 ND. 250 x 750 mm bh ###
2 ND. 300 x 750 mm bh ###
3 ND. 350 x 1000 mm bh ###
4 ND. 400 bh ###
5 ND. 450 x 1000 mm bh ###
6 ND. 500 x 1000 mm bh ###

Flange Las
1 Flange Las dia 10 3/4'' bh ###
Flange Las dia 3'' bh
Flange Las dia 12'' bh
2 Flange Las dia 14'' bh
3 Flange Las dia 16'' bh ###
4 Flange Las dia 18'' bh ###
5 Flange Las dia 20'' bh ###
DISMANTLING JOINT
1 ND. 10 3/4'' bh ###
2 ND. 14'' bh ###
3 ND. 16'' bh ###
4 ND. 18'' bh ###
5 ND. 20'' bh ###
6 ND. 22'' bh

DRESSER JOINT
1 ND. 100 mm bh ###
2 ND. 200 mm bh ###
3 ND. 250 mm bh ###
4 ND. 300 mm bh ###
5 ND. 400 mm bh ###
6 ND. 500 mm bh ###

VALVE
Gate Valve
1 ND. 2'' bh ###
2 ND. 3'' bh ###
NO URAIAN SAT HARGA SATUAN
3 ND. 4'' bh ###
4 ND. 6'' bh ###
5 ND. 8'' bh ###
6 ND. 10 3/4'' bh ###
ND. 12'' bh
7 ND. 14'' bh ###
8 ND. 16'' bh ###
9 ND. 18'' bh ###
10 ND. 20'' bh ###
NO URAIAN SAT HARGA SATUAN
WATER METER / FLOW METER
Water Meter
1 Flow Meter DN 90 mm bh ###
2 Flow Meter DN 110 mm bh ###

Elekktromagnetic Flow Meter With Display


1 ND. 200 mm bh ###
2 ND. 250 mm bh ###
3 ND. 400 mm bh ###
4 ND. 500 mm bh ###

Air Valve
1 ND 1'' bh ###
2 ND 2'' bh ###
ACCESSORIES LAIN
1 GIP OD 457,2 mm, tebal dinding 9,5 mm m
2 GIP OD 406,4 mm, tebal dinding 6,4 mm m
3 GIP OD 355,6 mm, tebal dinding 6,4 mm m
4 GIP OD 312.4 mm, tebal dinding 6,4 mm m
5 GIP OD 273,05 mm, tebal dinding 6,4 mm m
6 GIP OD 165,1 mm, tebal dinding 5 mm m
7 GIP OD 114,3 mm, tebal dinding 4,5 mm m
8 GIP OD 88,9 mm, tebal dinding 4 mm m
9 GIP OD 60,3 mm, tebal dinding 3,6 mm m
10 Bend 90° GIP OD 457,2 mm, tebal dinding 9,5 mm bh ###
11 Bend 45° OD 457,2 mm, tebal dinding 9,5 mm bh ###
12 Bend 22,5° GIP OD 457,2 mm, tebal dinding 9,5 mm bh ###
13 Bend 11,25° GIP OD 457,2 mm, tebal dinding 9,5 mm bh ###
14 Bend 90° GIP OD 406,4 mm, tebal dinding 6,4 mm bh
15 Bend 45° GIP OD 406,4 mm, tebal dinding 6,4 mm bh
16 Bend 22,5° GIP OD 406,4 mm, tebal dinding 6,4 mm bh
17 Bend 11,25° GIP OD 406,4 mm, tebal dinding 6,4 mm bh
18 Bend 90° GIP OD 355,6 mm, tebal dinding 6,4 mm bh ###
19 Bend 45° GIP OD 355,6 mm, tebal dinding 6,4 mm bh ###
20 Bend 22,5° GIP OD 355,6 mm, tebal dinding 6,4 mm bh ###
21 Bend 11,25° GIP OD 355,6 mm, tebal dinding 6,4 mm bh ###
22 Bend 90° GIP OD 312.4 mm, tebal dinding 6,4 mm bh
23 Bend 45° GIP OD 312.4 mm, tebal dinding 6,4 mm bh
24 Bend 22,5° GIP OD 312.4 mm, tebal dinding 6,4 mm bh
25 Bend 11,25° GIP OD 312.4 mm, tebal dinding 6,4 mm bh
26 Bend 90° GIP OD 273 mm, tebal dinding 6,4 mm bh ###
27 Bend 45° GIP OD 273 mm, tebal dinding 6,4 mm bh ###
28 Bend 22,5° GIP OD 273 mm, tebal dinding 6,4 mm bh ###
29 Bend 11,25° GIP OD 273 mm, tebal dinding 6,4 mm bh ###
30 Bend 90° GIP OD 165,1 mm, tebal dinding 5 mm bh
31 Bend 45° GIP OD 165,1 mm, tebal dinding 5 mm bh
32 Bend 22,5° GIP OD 165,1 mm, tebal dinding 5 mm bh
33 Bend 90° GIP OD 114,3 mm, tebal dinding 4,5mm bh
34 Bend 45° GIP OD 114,3 mm, tebal dinding 4,5mm bh
35 Bend 22,5° GIP OD 114,3 mm, tebal dinding 4,5mm bh
36 Bend 90° GIP OD 88,9 mm, tebal dinding 4 mm bh
37 Bend 45° GIP OD 88,9 mm, tebal dinding 4 mm bh
NO URAIAN SAT HARGA SATUAN

38 Bend 22,5° GIP OD 88,9 mm, tebal dinding 4 mm bh


39 Bend 90° GIP OD 60,3 mm, tebal dinding 3,6 mm bh
40 Bend 45° GIP OD 60,3 mm, tebal dinding 3,6 mm bh
41 Bend 22,5° GIP OD 60,3 mm, tebal dinding 3,6 mm bh
42 End Cap dia. 2'' bh
43 End Cap dia 3'' bh
44 Strainer Y 100 mm bh
45 Strainer Y 200 mm bh
46 Strainer Y 250 mm bh
47 Strainer Y 300 mm bh
48 Strainer Y 350 mm bh
49 Strainer Y 400 mm bh
50 Saringan 10" bh
51 Karet Packing dia 20'' bh
52 Karet Packing dia 18'' bh
53 Karet Packing dia 16'' bh
54 Karet Packing dia 14'' bh
55 Karet Packing dia 12'' bh
56 Karet Packing dia 6'' bh
57 Karet Packing dia 4'' bh
58 Karet Packing dia 3'' bh
59 Karet Packing dia 2'' bh
Harga Jumlah Harga
No. URAIAN satuan Volume
Satuan (Rp) (Rp)

I PEKERJAAN PERSIAPAN
I. 1 Mobilisasi seluruh peralatan, mesin, perlengkapan dan personil yang diperlukan
Peralatan :
- Excavator unit 1.00
- Dump truck unit 6.00
- Cold Milling Machine unit 1.00
- Asphalt finisher unit 1.00
- Tire roller unit 1.00
- Tandem roller unit 1.00
- Generator 125 kva unit 1.00
- Supporting tools ls 1.00
Personil
- Tenaga Kerja Setempat 10.00
Jumlah -
I. 1 Sewa Bangunan kantor kontraktor, workshop, gudang, tempat tinggal staf dan tenaga kerja, serta
fasilitas/bangunan lainnya termasuk furniture, penerangan, AC dan tempat parkir yang diperlukan untuk
pelaksanaan pekerjaan.
Gudang Sementara dan Kantor :
- Sewa Lahan, (Rp…../m2/month x 6 month) m2 1,000.00
- Pagar (barbed wire) LS 1.00
- Sewa Kantor Direksi (selama proyek) LS 1.00
- rumah jaga m2 4.00
- fasilitas pendukung ls 1.00
Jumlah -
I. 2 Sewa Peralatan dan biaya Personil untuk Pengendalian lalu-lintas pada jalan
umum, keamanan dan manajemen lapangan.
- Papan informasi/peringatan set 6.00
- Papan rambu set 14.00
- Plastik cone set 20.00
- Baricade set 30.00
- Pengaman galian :
- Sewa Plat baja untuk jalan masuk sementara lebar 1,2 m , tebal 10 mm ls 1.00

- Sewa 1 Mobil Tangki 5000 ltr (untuk mengendalikan debu) time 24.00
- Petugas Pengamanan :
a. Rigger orang 24.00
b. Sopir orang 6.00
c. Electrican orang 6.00
d. Pemberi tanda/pengatur lalu lintas/signal man :
group 1 orang 24.00
group 2 orang 24.00
group 3 orang 24.00
Jumlah -
I. 1 Mobilisasi seluruh peralatan, mesin, perlengkapan dan personil yang diperlukan
Peralatan :
- Excavator unit 2.00
- Dump truck unit 6.00
- Truck crane unit 1.00
- Cold Milling Machine unit -
- Vibro Hammer unit 1.00
- Buldozer unit 1.00
- Wheel loader unit 1.00
- Asphalt finisher unit -
- Vibration roller unit 1.00
- Tire roller unit 1.00
- Tandem roller unit 1.00
- Generator 50 kva unit 1.00
- Generator 125 kva unit 1.00
- Supporting tools ls 1.00
Personil
- Tenaga Kerja Setempat 10.00
Jumlah -
DAFTAR HARGA SATUAN BAHAN BANGUNAN
TAHUN 2014

NO NAMA BARANG SATUAN HARGA HARGA SATUAN

1 2 3 4 5 6
II. BAHAN BANGUNAN
A Bahan Pasangan :
1 Batu Belah M3

B Kerikil ( Koral ) :
1 Kerikil / Koral Beton M3

C Pasir :
1 Pasir Urug M3
2 Pasir Pasang M3
3 Pasir Beton M3

D Batu Bata :
1 Bata Pasang klas 1 Bj

E Portland Cement :
1 Semen Portland (40 kg) Zak
2 Semen Warna Kg

F Bahan Kayu :
1 Kayu Kamper Papan 3/20 M3 SURVEY TOKO
2 Kayu Kamper Balok 6/12 M3 SURVEY TOKO
3 Kayu kamper Usuk 5/7 cm M3 SURVEY TOKO
4 Kayu Kruing Balok 6/12 cm M3 SURVEY TOKO
5 Seseh Balok M3
6 Papan Begesting M3
7 Plywood 9 mm lbr
8 Plywood 4 mm lbr
9 List Kayu Profil M'
10 Kayu Dolken btg

G Beton Cetak :
1 Batako Solid Cetak KW.I Bj
2 Paving Block Tebal 6cm K 225 M2
3 Paving Block Tebal 8cm K 225 M2
4 U- Ditch 50 x 50 x 120 cm K 350 unit
5 Buis Beton Dia. 100cm bh

H Keramik
1 Keramik KW I 30/30 cm M2
2 Keramik KW I 20/25 cm M2
Keramik KW I 20/20 cm M2
3 Keramik KW I 20/60 cm M2
4 Keramik KW I 60/60 cm M2
5 Keramik KW I 40/40 cm M2
6 Keramik KW I 30/30 cm M2
7 Plin Keramik 10 x 40 cm bh
8 Stepnozing bh

I Bahan Besi & Aluminium


1 Besi Beton kg
2 Besi Profil kg
3 Besi Strip kg
4 Paku kg
5 Prifill Aluminium m'
6 Rolling Door Aluminium m2
7 Plat Baja Lbr
NO NAMA BARANG SATUAN HARGA HARGA SATUAN

1 2 3 4 5 6
8 Glass Wool m2

J Kawat :
1 Kawat ikat Beton Kg
2 Kawat 4 mm Kg
3 Kawat Las LB.3.3mm kg

K Bahan Finishing :
1 Amplas Lbr
2 Meni Kayu Kg
3 Meni Besi Kg
4 Plamir Kayu Kg
5 Cat Dasar Kayu Kg
6 Cat Penutup Kayu Kg
7 Cat Dasar Tembok Kg
8 Cat Tembok Kg
9 Politur Ltr
10 Politur jadi Ltr
11 Plamir Tembok Kg
12 Pengencer Ltr
13 Kuas bh
14 Minyak Begesting Ltr
15 Lem Kayu Kg
16 Compound Kg
17 Waterproff Ltr

L Bahan Kaca :
1 Kaca Bening 5 mm M2
2 Kaca Bening 3 mm M2
3 Sealent kg

M Alat Penggantung :
1 Kait Angin Psg
2 Gerendel Bh
3 Engsel kupu-kupu Psg
4 Engsel Nilon Psg
5 Engsel Pintu Baja AS 1'' Psg
6 Kunci Pintu Baja Psg
7 Handle dan Kunci Pintu Psg
8 Grendel Tanam Pintu Baja Psg

N Bahan Paku :
1 Paku Reng Kg
2 Paku Usuk Kg
3 Paku Kalsiboard ktk
4 Baut Spandek Kg
5 Baut Mur 12mm set
6 Baut Angker M22 set
7 Paku Skrup 1/2" ktk
8 Skrup Fixer buah
9 Baut 3/4" buah
10 Baut 1" buah
11 Bout Mour 3/4"x4" buah
12 Angker 1" buah
13 Plat Klem Pipa buah HARGA TAHUN
14 Elastoner buah
15 Suspention rod bracket 220 Bh
16 Suspention rod 226 Bh
17 Suspention clip 223 Bh
NO NAMA BARANG SATUAN HARGA HARGA SATUAN

1 2 3 4 5 6
18 Top cross rail 200 m'
19 Furing channel conector clip 210 Bh
20 Furing channel 204 m'
NO NAMA BARANG SATUAN HARGA HARGA SATUAN

1 2 3 4 5 6
21 Sekrup type S-25 mm Bh

O Bahan Atap
1 Genteng Karang Pilang ( Goodyear ) Bj
2 Bubungan Karang Pilang Bj
3 Atap Spandek 0.3 mm uk.620 x 75 cm lbr
4 Genteng Keramik Glasur bh
5 Bubungan Keramik Glasur bh
6 Talang seng m'
7 ikut celedu bh
8 murda bh

P Bahan Rangka Plafond :


1 Hollow M'
2 Ramset Bh
4 Hollow Besi 50.50.1,8mm m'

Q Bahan Plafond :
1 Kalsiboard 1220x2440x8mm Lbr
2 List Gypsum M'

Q Bahan Pipa
1 Pipa GIP dia 32 mm m

R Lain - Lain :
1 Tanah Urug M3
2 Talang Air Hujan set
3 Filler ltr
4 Baut Angkur M22 Penjangkaran 1000 mm bh
5 Tie Rod m
6 Patok Beton CP bh
7 Patok Beton BM bh
8 Patok Kayu bh
9 Buku Ukur ls
10 Waterstop m'
11 Sealant tube
12 Bensin Ltr
13 Solar Industri Ltr
14 Minyak Pelumas Ltr
15 Olie Ltr
16 Solar Ltr
17 Air Bersih M3
18 Kaporit Kg
19 Agregat A M3
20 Agregat B M3
21 Floor Drain Bh
22 Kran Air Bh
23 Sealtape Bh
24 Wastafel Bh
25 Closet Duduk Bh
26 Bata Gosok m2
27 Batu Candi m2
28 Paras Sangsit bh
29 Batu Andesit m2
30 Batu Bilah Random m2
31 Paras Klating tebal 2 cm m2
32 Paras Klating tebal 5 cm m2
NO NAMA BARANG SATUAN HARGA HARGA SATUAN

1 2 3 4 5 6
33 Rata-Rata Paras Klating m2
34 Mesin las (Welder) unit/jam
35 Pompa Air dan Compressor unit/jam
36 Alat Bantu unit/hari
37 Stamper unit/hari
38 Aspalt Cutter unit/jam
39 Dum Truck unit/jam
40 Blade Cutter bh
41 Jack Hammer unit/jam
42 Compresor unit/jam
43 Excavator unit/jam
44 Wheel Loader unit/jam
45 Motor Grader unit/jam
46 Tandem Roller unit/jam
47 Water Tanker unit/jam
48 Gerinda unit/hari
49 Mesin Pengetesan hari
50 Alat Ukur Theodolith unit/hari
51 Alat Ukur Waterpass unit/hari
52 Tripot / Tackel & handle crane 2 T hari
53 Pengadaan dan Pemasangan Tiang Lampu Jalan Double m
54 Pengadaan dan Pemasangan Tiang lampu PJU 6-7m Single m
55 Pekerjaan dan Pemasangan Pintu Railling m
56 Pekerjaan Pasangan Ralling (Hollow Galvanis) (Sesuai Disian) m
57 Lampu PJU LED 50W bh
58 Double Switch 10 A/ 220V plano bh
59 Kabel NYFGBY 2x2,5mm m
DAFTAR HARGA SATUAN UPAH
DINAS PEKERJAAN UMUM KAB. BULELENG

NO NAMA BARANG/ JASA SATUAN UPAH (Rp)

(1) (2) (3) (4)


1 Pekerja OH
2 Mandor OH
3 Kepala Tukang Kayu OH
4 Kepala Tukang Batu OH
5 Kepala Tukang Besi OH
6 Kepala Tukang Cat OH
7 Kepala Tukang Style Bali OH
8 Kepala Tukang Pipa OH
9 Kepala Tukang Listrik OH
11 Kepala Tukang Las OH
12 Tukang Kayu OH
13 Tukang Batu OH
14 Tukang Besi OH
15 Tukang Las OH
16 Tukang Cat OH
17 Tukang Politur OH
19 Tukang Pipa OH
20 Tukang Listrik OH
21 Tukang Gali OH
22 Operator OH
23 Tukang Ukir Kayu OH
24 Tukang Ukir Paras OH
25 Tukang masak aspal OH
26 Mekanik Pemboran OH
27 Pembantu Tukang Listrik OH
28 Mekanik OH
29 Juru Ukur OH
30 Superviser OH
29 Driller OH
29 Asisten Driller OH
30 Welder OH
27 Helper / Pilter OH
28 Sopir OH
DAFTAR HARGA ASSESORIES PVC

NO URAIAN SAT HARGA SATUAN


PIPA
1 Pipa PVC OD 315 mm
2 Pipa PVC R-R OD 90 mm, S 12,5 m

BEND
1 Bend 90° Pipa PVC dia OD 90 mm bh
2 Bend 45° Pipa PVC dia OD 90 mm bh
3 Bend 22,5° Pipa PVC dia OD 90 mm bh

TAPE CORE
1 Tapper Core dia 90 mm bh

1
DAFTAR BIAYA SEWA PERALATAN PER JAM KERJA

BIAYA
No. URAIAN KO HP KAP. HARGA SEWA KET.
DE ALAT ALAT/JAM
(di luar PPN)

1 ASPHALT MIXING PLANT E01 294 60 T/Jam


2 ASPHALT FINISHER E02 72.4 10 Ton
3 ASPHALT SPRAYER E03 4 850 Liter
4 BULLDOZER 100-150 HP E04 155 - -
5 COMPRESSOR 4000-6500 L\M E05 60 5000 CPM/(L/m)
6 CONCRETE MIXER 0.3-0.6 M3 E06 20 500 Liter
7 CRANE 10-15 TON E07 138 15 Ton
8 DUMP TRUCK 3.5 TON E08 100 3.5 Ton
9 DUMP TRUCK 10 TON E09 190 10 Ton
10 EXCAVATOR 80-140 HP E10 133 0.93 M3
11 FLAT BED TRUCK 3-4 M3 E11 190 10 ton
12 GENERATOR SET E12 180 135 KVA
13 MOTOR GRADER >100 HP E13 135 10800 -
14 TRACK LOADER 75-100 HP E14 70 0.8 M3
15 WHEEL LOADER 1.0-1.6 M3 E15 96 1.5 M3
16 THREE WHEEL ROLLER 6-8 T E16 55 8 Ton
17 TANDEM ROLLER 6-8 T. E17 82 8.1 Ton
18 TIRE ROLLER 8-10 T. E18 100.5 9 Ton
19 VIBRATORY ROLLER 5-8 T. E19 82 7.05 Ton
20 CONCRETE VIBRATOR E20 5.5 25 -
21 STONE CRUSHER E21 220 60 T/Jam
22 WATER PUMP 70-100 mm E22 6- -
23 WATER TANKER 3000-4500 L. E23 100 4000 Liter
24 PEDESTRIAN ROLLER E24 8.8 835 Ton
25 TAMPER E25 4.7 121 Ton
26 JACK HAMMER E26 0 1330 -
27 FULVI MIXER E27 345 2005 -
28 CONCRETE PUMP E28 100 8 M3
29 TRAILER 20 TON E29 175 20 Ton
30 PILE DRIVER + HAMMER E30 25 2.5 Ton
31 CRANE ON TRACK 35 TON E31 125 35 Ton
32 WELDING SET E32 40 250 Amp
33 BORE PILE MACHINE E33 150 2000 Meter
34 ASPHALT LIQUID MIXER E34 5 1000 Liter
35 TRONTON E35 150 15 Ton
36 COLD MILLING E36 248 1000 m
37 ROCK DRILL BREAKER E37 3- -
38 COLD RECYCLER E38 900 2200 M
39 HOT RECYCLER E39 400 3M
40 AGGREGAT (CHIP) SPREADER E40 115 3.5 M
41 ASPHALT DISTRIBUTOR E41 115 4000 Liter
42 SLIP FORM PAVER E42 105 2.5 M
43 CONCRETE PAN MIXER E43 134 600 Liter
44 CONCRETE BREAKER E44 290 20 m3/jam
45 ASPAHLT TANKER E45 190 4000 liter
46 CEMENT TANKER E46 190 4000 liter
47 CONDRETE MIXER (350) E47 20 350 liter
48 VIBRATING RAMMER E48 4.2 80 KG
49 TRUK MIXER (AGITATOR) E49 220 5 M3
50 BORE PILE MACHINE E50 125 60 CM
51 CRANE ON TRACK 75-100 TON E51 200 75 Ton
52 BLENDING EQUIPMENT E52 50 30 Ton
53 ASPHALT LIQUID MIXER E34a 40 20000 Liter
54 BAR BENDER E53 3 0 0
55 BAR CUTTER E54 3 0 0
56 BREAKER E55 80 3 m3/jam
57 GROUTING PUMP E56 100 15 Ton
58 JACK HIDROLIC E57 3 150 Ton
59 MESIN LAS E58 3 0.17 Ton
60 PILE DRIVER LEADER, 75 kw E59 70 75 kw
61 PILE HAMMER E60 10 0 0
62 PILE HAMMER, 2,5 Ton E61 1 2.5 Ton
63 STRESSING JACK E62 89 15 Ton
64 WELDING MACHINE, 300 A E63 5 0 0
1 Penurunan dan Pemasangan Pipa PVC OD 90 mm sepanjang 6 m'
NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Mandor OH 0.009 - -
Tukang pipa OH 0.047 - -
Pekerja OH 0.094 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Pipa PVC OD 90 mm m 6.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
G. Harga Satuan Pekerjaan / m -

2 Pengetesan Pipa Sepanjang 100 m'


NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja 0.800 - -
Mandor 0.080 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Air Bersih m3 0.006 - -
Bahan Bakar liter 0.060 - -
Oli liter 0.002 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Mesin Pengetesan liter 0.2667 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
G. Harga Satuan Pekerjaan / m -
3 Flushing Pipa Sepanjang 100 m'
NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja 2.000 - -
Mandor 1.000 - -
Tukang Pipa 1.000 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Air Bersih m3 6.0000 - -
Solar liter 5.0240 - -
JUMLAH HARGA BAHAN -
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
G. Harga Satuan Pekerjaan / m -

4 Pemasangan Fitting PVC Bend 90⁰ OD 90 mm


NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Mandor OH 0.023 - -
Tukang pipa OH 0.180 - -
Pekerja OH 0.225 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Bend PVC 90⁰ OD 90 mm Bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Alat Bantu Ls 1.0000 10,000.00 10,000.00
JUMLAH HARGA ALAT 10,000.00

D. Jumlah (A + B + C) 10,000.00
E. Overhead & Profit 5% x D 500.00
F. Harga Satuan Pekerjaan (D+E) 10,500.00
Pemasangan Fitting PVC Bend 45⁰ OD 90 mm
NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Mandor OH 0.023 - -
Tukang pipa OH 0.180 - -
Pekerja OH 0.225 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Bend PVC 45⁰ OD 90 mm Bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Alat Bantu Ls 1.0000 10,000.00 10,000.00
JUMLAH HARGA ALAT 10,000.00

D. Jumlah (A + B + C) 10,000.00
E. Overhead & Profit 5% x D 500.00
F. Harga Satuan Pekerjaan (D+E) 10,500.00

Pemasangan Fitting PVC Bend 22,5⁰ OD 90 mm


NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Mandor OH 0.023 - -
Tukang pipa OH 0.180 - -
Pekerja OH 0.225 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Bend PVC 22,5⁰ OD 355 mm Bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Alat Bantu Ls 1.0000 10,000.00 10,000.00
JUMLAH HARGA ALAT 10,000.00

D. Jumlah (A + B + C) 10,000.00
E. Overhead & Profit 5% x D 500.00
F. Harga Satuan Pekerjaan (D+E) 10,500.00
Pemasangan Fitting Taper Core OD 90 mm
NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Mandor OH 0.023 - -
Tukang pipa OH 0.180 - -
Pekerja OH 0.225 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Taper Core OD 90 mm Bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -

Penurunan Pengadaan dan Pemasangan Pipa PVC OD 315 mm S-8 sepanjang 6 m'
NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Mandor OH 0.100 - -
Kepala Tukang pipa OH 0.100 - -
Tukang pipa OH 0.500 - -
Pekerja OH 1.000 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Pipa PVC OD 315 mm m 6.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 5% x D -
F. Harga Satuan Pekerjaan (D+E) -
G. Harga Satuan Pekerjaan / m -

Pengadaan dan Pemasangan Bend PVC 90⁰ x 315 mm


NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Mandor OH 0.100 158,000.00 15,800.00
Tukang pipa OH 0.800 114,345.00 91,476.00
Pekerja OH 1.000 101,640.00 101,640.00
Alat Bantu OH 1.000 5,000.00 5,000.00
JUMLAH TENAGA KERJA 213,916.00
B. BAHAN
Bend PVC 90⁰ x 315 mm BH 1.000 Err:509 Err:509

JUMLAH HARGA BAHAN Err:509


C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) Err:509
E. Overhead & Profit 5% x D Err:509
F. Harga Satuan Pekerjaan (D+E) Err:509

Pengadaan dan Pemasangan Bend PVC 45⁰ x 315 mm


NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Mandor OH 0.100 158,000.00 15,800.00
Tukang pipa OH 0.800 114,345.00 91,476.00
Pekerja OH 1.000 101,640.00 101,640.00
Alat Bantu OH 1.000 5,000.00 5,000.00
JUMLAH TENAGA KERJA 213,916.00
B. BAHAN
Bend PVC 45⁰ x 315 mm BH 1.0000 Err:509 Err:509
JUMLAH HARGA BAHAN Err:509
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) Err:509
E. Overhead & Profit 5% x D Err:509
F. Harga Satuan Pekerjaan (D+E) Err:509

Pengetesan Pipa
NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
Analisa Harga Satuan
Kode : (existing Unpavement)
Uraian : Pek. tanah untuk Pemasangan Pipa diameter 457,2 mm
Satuan : per 1.0 m
No Uraian Sat. Harga Satuan Vol. Jumlah Keterangan
(Yen) (Rp) (Yen) (Rp)
1 Pek. Memotong aspal m 0 1.000 0 SP8
2 Galian batu/bongkaran beton/pasangan batu dg excavator 0.35 m3 m3 0 0.900 0 SP9
3 Galian tanah biasa dengan excavator 0.35 m3 m3 0 0.900 0 SP10
4 Urugan tanah kembali m 3
0 0.666 0 SP4
5 Urugan Pasir u/ bedding pipa m3 0 0.475 0 SP7
6 Agregat Klas B m3 0 0.360 0 SP13
7 Pemadatan tanah dengan stamper m3 0 1.026 0 SP6
8 Pengangkutan tanah ke temporary site m 3
0 1.134 0 SP120
(DT 4ton diisi dgn excavator) l = 2 km
9 Pekerjaan beton K175 m3 0 0.135 0 SP36
Harga Satuan 0

Analisa Harga Satuan


Kode :
Uraian : Pek tanah untuk pipa diameter 457,2 mm (existing hotmix)
Satuan : per 1.0 m
Jumlah
Harga Satuan Jumlah
No Uraian Sat. Vol. Keterangan
(Yen) (Rp) (Yen) (Rp)
1 Pek. Memotong aspal m 0 2.000 0 SP8
2 Galian batu/bongkaran beton/pasangan batu dg excavator 0.35 m3 m3 0 0.900 0 SP9
3 Galian tanah biasa dengan excavator 0.35 m3 m3 0 0.900 0 SP10
4 Urugan tanah kembali m3 0 0.630 0 SP3
5 Urugan Pasir u/ bedding pipa m 3
0 0.473 0 SP7
6 Agregat Klas B m3 0 0.360 0 SP13
7 Pemadatan tanah dengan stamper m3 0 0.990 0 SP6
8 Pengangkutan tanah ke temporary site m 3
0 1.170 0 SP120
(DT 4ton diisi dgn excavator) l = 2 km m3
9 Pekerjaan beton K250 m3 0 0.135 0 SP38
Harga Satuan 0
Pengelasan 1 cm besi/baja dengan las listrik
PP1 NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.009 - -
Mandor OH 0.009 - -
Tukang Las OH 0.009 - -
Kepala Tukang Las OH 0.004 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Kawat Las Kg 0.0400 - -
Solar industri Liter 0.0300 - -
Minyak Pelumas Liter 0.0040 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Mesin Las Hari 0.0028 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) -

PP2 Penyambungan 12 m Pipa Baja Three layer Polythylene dia.OD 558,8 mm,tebal 7,92 mm
NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 8.458 - -
Mandor OH 0.571 - -
Tukang Las OH 18.795 - -
Kepala Tukang Las OH 1.879 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Pengelasan cm 172.7000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Alat Bantu 0.5% x (A+B) Ls 1.0000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) -
G. Harga Satuan Pekerjaan / m -
PP3 Penyambungan 12 m Pipa Baja Three layer Polythylene dia.OD 508 mm,tebal 7,14 mm
NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 7.812 - -
Mandor OH 0.527 - -
Tukang Las OH 17.359 - -
Kepala Tukang Las OH 1.736 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Pengelasan cm 159.5120 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Alat Bantu 0.5% x (A+B) Ls 1.0000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) -
G. Harga Satuan Pekerjaan / m -

PP4 Penyambungan 12 m Pipa Baja Three layer Polythylene dia.OD 457,2 mm,tebal 6,35 mm
NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 7.031 - -
Mandor OH 0.474 - -
Tukang Las OH 15.623 - -
Kepala Tukang Las OH 1.562 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Pengelasan cm 161.1630 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Alat Bantu 0.5% x (A+B) Ls 1.0000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) -
G. Harga Satuan Pekerjaan / m -
PP5 Penyambungan 12 m Pipa Baja Three layer Polythylene dia.OD 406,4 mm,tebal 5,56 mm
NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 7.257 - -
Mandor OH 0.490 - -
Tukang Las OH 16.127 - -
Kepala Tukang Las OH 1.613 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Pengelasan cm 148.1915 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Alat Bantu 0.5% x (A+B) Ls 1.0000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) -
G. Harga Satuan Pekerjaan / m -

PP5 Penyambungan 12 m Pipa Baja Three layer Polythylene dia.OD 355,6 mm,tebal 5,16 mm
NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 3.888 - -
Mandor OH 0.197 - -
Tukang Las OH 6.481 - -
Kepala Tukang Las OH 0.648 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Pengelasan cm 111.6584 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Alat Bantu 0.5% x (A+B) Ls 1.0000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) -
G. Harga Satuan Pekerjaan / m -
PP6 Penyambungan 12 m Pipa Baja Three layer Polythylene dia.OD 273,05 mm, tebal 4,17 mm
NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 2.986 - -
Mandor OH 0.151 - -
Tukang Las OH 4.976 - -
Kepala Tukang Las OH 0.498 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Pengelasan cm 85.7377 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Alat Bantu 0.5% x (A+B) Ls 1.0000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) -
G. Harga Satuan Pekerjaan / m -

PP7 Pengetesan 500 m Pipa Baja Three layer Polythylene dia.OD 558,8 mm,tebal 7,92 mm
NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 10.886 - -
Mandor OH 2.117 - -
Tukang Pipa OH 4.233 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Bensin ltr 50.800 - -
Air Bersih m3 79.7560 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Pompa Air dan Compressor unit/bln 0.186 - -
Alat bantu unit/hr 1.0160 37,500.00 38,100.00
JUMLAH HARGA ALAT 38,100.00

D. Jumlah (A + B + C) 38,100.00
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 38,100.00
G. Harga Satuan Pekerjaan / m 76.20
PP8 Pengetesan 500 m Pipa Baja Three layer Polythylene dia.OD 508 mm,tebal 7,14 mm
NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 8.571 - -
Mandor OH 1.667 - -
Tukang Pipa OH 3.333 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Bensin ltr 50.000 - -
Air Bersih m3 71.7804 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Pompa Air dan Compressor unit/bln 0.133 - -
Alat bantu unit/hr 1.0000 37,500.00 37,500.00
JUMLAH HARGA ALAT 37,500.00

D. Jumlah (A + B + C) 37,500.00
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 37,500.00
G. Harga Satuan Pekerjaan / m 75.00

PP9 Pengetesan 500 m Pipa Baja Three layer Polythylene dia.OD 457,2 mm,tebal 6,35 mm
NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 8.571 - -
Mandor OH 1.667 - -
Tukang Pipa OH 3.333 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Bensin ltr 50.000 - -
Air Bersih m3 71.7804 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Pompa Air dan Compressor unit/bln 0.133 - -
Alat bantu unit/hr 1.0000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) -
G. Harga Satuan Pekerjaan / m -
PP10 Pengetesan 500 m Pipa Baja Three layer Polythylene dia.OD 406,4 mm,tebal 5,56 mm
NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 8.571 - -
Mandor OH 1.667 - -
Tukang Pipa OH 3.333 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Bensin ltr 50.000 - -
Air Bersih m3 54.2455 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Pompa Air dan Compressor unit/bln 0.133 - -
Alat bantu unit/hr 1.0000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) -
G. Harga Satuan Pekerjaan / m -

PP11 Pengetesan 500 m Pipa Baja Three layer Polythylene dia.OD 355,6 mm,tebal 5,16 mm
NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 8.571 - -
Mandor OH 1.667 - -
Tukang Pipa OH 3.333 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Bensin ltr 50.000 - -
Air Bersih m3 47.4648 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Pompa Air dan Compressor unit/bln 0.133 - -
Alat bantu unit/hr 1.0000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) -
G. Harga Satuan Pekerjaan / m -
PP12 Pengetesan 500 m Pipa Baja Three layer Polythylene dia.OD 273,05 mm, tebal 4,17 mm
NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 8.571 - -
Mandor OH 1.667 - -
Tukang Pipa OH 3.333 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Bensin ltr 50.000 - -
Air Bersih m3 26.7930 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Pompa Air dan Compressor unit/bln 0.133 - -
Alat bantu unit/hr 1.0000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) -
G. Harga Satuan Pekerjaan / m -

PP13 Flushing 500 m Pipa Baja Three layer Polythylene dia.OD 558,8 mm,tebal 7,92 mm
NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 19.159 - -
Mandor OH 3.725 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Kaporit kg 87.131 - -
Air Bersih m3 175.4632 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) -
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) -
G. Harga Satuan Pekerjaan / m -
PP19 Penyambungan 1 bh accessories pipa Baja Three Layer dia ID (22'')
NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Mandor OH 0.175 - -
Tukang Pipa OH 0.489 - -
Pekerja OH 1.467 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Pengelasan Kg 175.4632 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Alat Bantu Ls 1.0000 95,000.00 95,000.00
JUMLAH HARGA ALAT 95,000.00

D. Jumlah (A + B + C) 95,000.00
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 95,000.00
PP20 Penyambungan 1 bh accessories pipa Baja Three Layer dia (20'')
NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Mandor OH 0.159 - -
Tukang Pipa OH 0.445 - -
Pekerja OH 1.334 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Pengelasan Kg 159.512 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Alat Bantu Ls 1.0000 95,000.00 95,000.00
JUMLAH HARGA ALAT 95,000.00

D. Jumlah (A + B + C) 95,000.00
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 95,000.00

PP21 Penyambungan 1 bh accessories pipa Baja Three Layer dia OD (18'')


NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Mandor OH 0.143 - -
Tukang Pipa OH 0.400 - -
Pekerja OH 1.200 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Pengelasan Kg 143.561 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Alat Bantu Ls 1.0000 90,000.00 90,000.00
JUMLAH HARGA ALAT 90,000.00

D. Jumlah (A + B + C) 90,000.00
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 90,000.00
PP22 Penyambungan 1 bh accessories pipa Baja Three Layer dia (16'')
NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Mandor OH 0.123 - -
Tukang Pipa OH 0.330 - -
Pekerja OH 0.990 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Pengelasan Kg 109.9000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Alat Bantu Ls 1.0000 90,000.00 90,000.00
JUMLAH HARGA ALAT 90,000.00

D. Jumlah (A + B + C) 90,000.00
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 90,000.00

PP23 Penyambungan 1 bh accessories pipa Baja Three Layer dia OD (14'')


NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Mandor OH 0.145 - -
Tukang Pipa OH 0.379 - -
Pekerja OH 1.150 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Pengelasan Kg 111.658 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Alat Bantu Ls 1.0000 60,000.00 60,000.00
JUMLAH HARGA ALAT 60,000.00

D. Jumlah (A + B + C) 60,000.00
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 60,000.00
PP24 Penyambungan 1 bh accessories pipa Baja Three Layer dia (10 3/4'')
NO. URAIAN SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Mandor OH 0.131 - -
Tukang Pipa OH 0.328 - -
Pekerja OH 1.038 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Pengelasan Kg 85.7377 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Alat Bantu Ls 1.0000 60,000.00 60,000.00
JUMLAH HARGA ALAT 60,000.00

D. Jumlah (A + B + C) 60,000.00
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 60,000.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6

I PEKERJAAN PERSIAPAN
1 Pengukuran dan Pematokan mtr 183,013.00
2 Test pit ttk
3 Sewa lahan dibawah jalan Toll setahun m2
4 Penyediaan lokasi pembuangan hasil galian ls

5 ls
Pembersihan semua fasilitas sementara, Pemindahan mesin/peralatan, material sisa dan sebagainya
JUMLAH I

II PEKERJAAN OPEN TRENCH DGN CLEAN CONSTRUCTION (Eksisting Hot Mix)

1 Pipa dia ID 900 mm double m' 34,690.00 - -


2 Pipa dia ID 900 mm single m' 10,110.00 - -
3 Pipa dia ID 700 mm m' 12,292.00 - -
4 Pipa dia ID 550 mm m' 16,750.00 - -
5 Pipa dia ID 500 mm m' 21,201.00 - -
6 Pipa dia ID 400 mm m' 7,290.00 - -
7 Pipa dia ID 350 mm m' 24,550.00 - -
8 Pipa dia ID 300 m' 21,440.00 - -
JUMLAH II -

III PEKERJAAN OPEN TRENCH DGN CLEAN CONSTRUCTION

1 Lapis Resap Pengikat - Aspal Cair liter 225,527.46 Err:509 Err:509


2 Lapis Perekat - Aspal Cair liter 44,924.04 Err:509 Err:509
3 Laston Lapis Aus (AC-WC) (gradasi halus/kasar) ton 24,484.71 Err:509 Err:509
4 Laston Lapis Antara (AC-BC) (gradasi halus/kasar) ton 28,093.97 Err:509 Err:509
5 Aspal Minyak ton 3,150.46 Err:509 Err:509
6 Bahan Pengisi (Filler) Tambahan liter
JUMLAH III Err:509

IV PEKERJAAN PENGADAAN PIPA DAN ACCESSORIES

1 Pipa Baja Three layer Polythylene dia.ID 900 mm m 79,490.00 Err:509 Err:509
2 Pipa Baja Three layer Polythylene dia.ID 700 mm m 12,292.00 Err:509 Err:509
3 Pipa Baja Three layer Polythylene dia.ID 550 mm m 16,750.00 Err:509 Err:509
4 Pipa Baja Three layer Polythylene dia.ID 500 mm m 21,201.00 Err:509 Err:509
5 Pipa Baja Three layer Polythylene dia.ID 400 mm m 7,290.00 - -
6 Pipa Baja Three layer Polythylene dia.ID 350 mm m 24,550.00 - -
7 Pipa Baja Three layer Polythylene dia.ID 300 mm m 21,440.00 - -
8 Bend 90° Three Layer Polythelene dia 900 mm bh Err:509 Err:509
9 Bend 45° Three Layer Polythelene dia 900 mm bh Err:509 Err:509
10 Bend 22,5°Three Layer Polythelene dia 900 mm bh Err:509 Err:509
11 Bend 11,25° Three Layer Polythelene dia 900 mm bh Err:509 Err:509
12 Bend 90° Three Layer Polythelene dia 700 mm bh Err:509 Err:509
13 Bend 45° Three Layer Polythelene dia 700 mm bh Err:509 Err:509
14 Bend 22,5° Three Layer Polythelene dia 700 mm bh Err:509 Err:509
15 Bend 11,25° Three Layer Polythelene dia 700 mm bh Err:509 Err:509
16 Bend 90° Three Layer Polythelene dia 550 mm bh Err:509 Err:509
17 Bend 45° Three Layer Polythelene dia 550 mm bh Err:509 Err:509
18 Bend 22,5° Three Layer Polythelene dia 550 mm bh Err:509 Err:509
19 Bend 11,25° Three Layer Polythelene dia 550 mm bh Err:509 Err:509
20 Bend 90° Three Layer Polythelene dia 500 mm bh Err:509 Err:509
21 Bend 45° Three Layer Polythelene dia 500 mm bh Err:509 Err:509
22 Bend 22,5° Three Layer Polythelene dia 500 mm bh Err:509 Err:509
23 Bend 11,25° Three Layer Polythelene dia 500 mm bh Err:509 Err:509
24 Bend 90° Three Layer Polythelene dia 400 mm bh - -
25 Bend 45° Three Layer Polythelene dia 400 mm bh - -
26 Bend 22,5° Three Layer Polythelene dia 400 mm bh - -
27 Bend 11,25° Three Layer Polythelene dia 400 mm bh - -
28 Bend 90° Three Layer Polythelene dia 350 mm bh - -
29 Bend 45° Three Layer Polythelene dia 350 mm bh - -
30 Bend 22,5° Three Layer Polythelene dia 350 mm bh - -
31 Bend 11,25° Three Layer Polythelene dia 350 mm bh - -
32 Bend 90° Three Layer Polythelene dia 300 mm bh - -
33 Bend 45° Three Layer Polythelene dia 300 mm bh - -
34 Bend 22,5° Three Layer Polythelene dia 300 mm bh - -
35 Bend 11,25° Three Layer Polythelene dia 300 mm bh - -
36 Tee dia 900 mm bh Err:509 Err:509
37 Reducer dia 900 x 500 mm bh Err:509 Err:509
38 AF Tee dia 500 mm bh Err:509 Err:509
39 AF Tee Reducer dia 550 x 350 mm bh Err:509 Err:509
40 AF Tee Reducer dia 350 x 300 mm bh Err:509 Err:509
41 AF Tee Reducer dia 500 x 400 mm bh Err:509 Err:509
42 AF Tee Reducer dia 400 x 350 mm bh Err:509 Err:509
43 AF Gate Valve PN 16 dia. 900 bh Err:509 Err:509
44 AF Gate Valve PN 16 dia. 700 bh Err:509 Err:509
45 AF Gate Valve PN 16 dia. 550 bh Err:509 Err:509
46 AF Gate Valve PN 16 dia. 500 bh - -
47 AF Gate Valve PN 16 dia. 400 bh - -
48 AF Gate Valve PN 16 dia. 350 bh - -
49 AF Gate Valve PN 16 dia. 300 bh - -
50 Dismantling Joint dia. 900 bh Err:509 Err:509
51 Dismantling Joint dia. 700 bh Err:509 Err:509
52 Dismantling Joint dia. 550 bh Err:509 Err:509
53 Dismantling Joint dia. 500 bh - -
54 Dismantling Joint dia. 400 bh - -
55 Dismantling Joint dia. 350 bh - -
56 Dismantling Joint dia. 300 bh - -
JUMLAH IV Err:509

V PEKERJAAN PEMASANGAN PIPA DAN ACCESSORIES

1 Pipa Baja Three layer Polythylene dia.ID 900 mm m 79,490.00 Err:509 Err:509
2 Pipa Baja Three layer Polythylene dia.ID 700 mm m 12,292.00 Err:509 Err:509
3 Pipa Baja Three layer Polythylene dia.ID 550 mm m 16,750.00 Err:509 Err:509
4 Pipa Baja Three layer Polythylene dia.ID 500 mm m 21,201.00 - -
5 Pipa Baja Three layer Polythylene dia.ID 400 mm m 7,290.00 - -
6 Pipa Baja Three layer Polythylene dia.ID 350 mm m 24,550.00 - -
7 Pipa Baja Three layer Polythylene dia.ID 300 mm m 21,440.00 - -
8 Bend 90° Three Layer Polythelene dia 900 mm bh - Err:509 Err:509
9 Bend 45° Three Layer Polythelene dia 900 mm bh - Err:509 Err:509
10 Bend 22,5°Three Layer Polythelene dia 900 mm bh - Err:509 Err:509
11 Bend 11,25° Three Layer Polythelene dia 900 mm bh - Err:509 Err:509
12 Bend 90° Three Layer Polythelene dia 700 mm bh - Err:509 Err:509
13 Bend 45° Three Layer Polythelene dia 700 mm bh - Err:509 Err:509
14 Bend 22,5° Three Layer Polythelene dia 700 mm bh - Err:509 Err:509
15 Bend 11,25° Three Layer Polythelene dia 700 mm bh - Err:509 Err:509
16 Bend 90° Three Layer Polythelene dia 550 mm bh - Err:509 Err:509
17 Bend 45° Three Layer Polythelene dia 550 mm bh - Err:509 Err:509
18 Bend 22,5° Three Layer Polythelene dia 550 mm bh - Err:509 Err:509
19 Bend 11,25° Three Layer Polythelene dia 550 mm bh - Err:509 Err:509
20 Bend 90° Three Layer Polythelene dia 500 mm bh - 95,000.00 -
21 Bend 45° Three Layer Polythelene dia 500 mm bh - 95,000.00 -
22 Bend 22,5° Three Layer Polythelene dia 500 mm bh - 95,000.00 -
23 Bend 11,25° Three Layer Polythelene dia 500 mm bh - 95,000.00 -
24 Bend 90° Three Layer Polythelene dia 400 mm bh - 90,000.00 -
25 Bend 45° Three Layer Polythelene dia 400 mm bh - 90,000.00 -
26 Bend 22,5° Three Layer Polythelene dia 400 mm bh - 90,000.00 -
27 Bend 11,25° Three Layer Polythelene dia 400 mm bh - 90,000.00 -
28 Bend 90° Three Layer Polythelene dia 350 mm bh - 90,000.00 -
29 Bend 45° Three Layer Polythelene dia 350 mm bh - 90,000.00 -
30 Bend 22,5° Three Layer Polythelene dia 350 mm bh - 90,000.00 -
31 Bend 11,25° Three Layer Polythelene dia 350 mm bh - 90,000.00 -
32 Bend 90° Three Layer Polythelene dia 300 mm bh - 60,000.00 -
33 Bend 45° Three Layer Polythelene dia 300 mm bh - 60,000.00 -
34 Bend 22,5° Three Layer Polythelene dia 300 mm bh - 60,000.00 -
35 Bend 11,25° Three Layer Polythelene dia 300 mm bh - 60,000.00 -
36 Tee dia 900 mm bh - Err:509 Err:509
37 Reducer dia 900 x 500 mm bh - Err:509 Err:509
38 AF Tee dia 500 mm bh - 95,000.00 -
39 AF Tee Reducer dia 550 x 350 mm bh - Err:509 Err:509
40 AF Tee Reducer dia 350 x 300 mm bh - 90,000.00 -
41 AF Tee Reducer dia 500 x 400 mm bh - 95,000.00 -
42 AF Tee Reducer dia 400 x 350 mm bh - 90,000.00 -
43 AF Gate Valve PN 16 dia. 900 bh - Err:509 Err:509
44 AF Gate Valve PN 16 dia. 700 bh - Err:509 Err:509
45 AF Gate Valve PN 16 dia. 550 bh - Err:509 Err:509
46 AF Gate Valve PN 16 dia. 500 bh - 95,000.00 -
47 AF Gate Valve PN 16 dia. 400 bh - 90,000.00 -
48 AF Gate Valve PN 16 dia. 350 bh - 90,000.00 -
49 AF Gate Valve PN 16 dia. 300 bh - 60,000.00 -
50 Dismantling Joint dia. 900 bh - Err:509 Err:509
51 Dismantling Joint dia. 700 bh - Err:509 Err:509
52 Dismantling Joint dia. 550 bh - Err:509 Err:509
53 Dismantling Joint dia. 500 bh - 95,000.00 -
54 Dismantling Joint dia. 400 bh - 90,000.00 -
55 Dismantling Joint dia. 350 bh - 90,000.00 -
56 Dismantling Joint dia. 300 bh - 60,000.00 -

JUMLAH IV
Err:509
VI PEKERJAAN PENGETESAN PIPA DAN ACCESSORIES

1 Pipa Baja Three layer Polythylene dia.ID 900 mm m 79,490.00 Err:509 Err:509
2 Pipa Baja Three layer Polythylene dia.ID 700 mm m 12,292.00 Err:509 Err:509
3 Pipa Baja Three layer Polythylene dia.ID 550 mm m 16,750.00 Err:509 Err:509
4 Pipa Baja Three layer Polythylene dia.ID 500 mm m 21,201.00 76.20 1,615,516.20
5 Pipa Baja Three layer Polythylene dia.ID 400 mm m 7,290.00 - -
6 Pipa Baja Three layer Polythylene dia.ID 350 mm m 24,550.00 - -
7 Pipa Baja Three layer Polythylene dia.ID 300 mm m 21,440.00 - -
JUMLAH V
Err:509
VII PEKERJAAN FLUSHING PIPA DAN ACCESSORIES

1 Pipa Baja Three layer Polythylene dia.ID 900 mm m 79,490.00 Err:509 Err:509
2 Pipa Baja Three layer Polythylene dia.ID 700 mm m 12,292.00 Err:509 Err:509
3 Pipa Baja Three layer Polythylene dia.ID 550 mm m 16,750.00 Err:509 Err:509
4 Pipa Baja Three layer Polythylene dia.ID 500 mm m 21,201.00 - -
5 Pipa Baja Three layer Polythylene dia.ID 400 mm m 7,290.00 - -
6 Pipa Baja Three layer Polythylene dia.ID 350 mm m 24,550.00 - -
7 Pipa Baja Three layer Polythylene dia.ID 300 mm m 21,440.00 - -
JUMLAH V
Err:509
I PEKERJAAN BANGUNAN INTAKE Err:509

HARGA PER LTR/DTK Err:509


1 Pekerjaan Tanah
1 Pengukuran dan Pasang Bowplank m' 109.90 - -
2 Galian Tanah dengan Excavator m3 3,423.67 - -
3 Urugan Tanah Kembali dengan Pemadatan m3 1,334.96 - -
4 Urugan Pasir m3 24.11 - -
Jumlah 1 -

2 Pekerjaan Beton
1 Lantai Kerja K 125 ( 1 pc : 3 ps : 5 Kr) m3 23.51 - -
2 Pondasi Beton Plat Kaki
- Beton K 300 m3 2.92 - -
- Pembesian kg 565.39 - -
- Begesting Batako m2 7.68 - -
3 Plat Lantai Dasar
- Beton K 300 m3 92.62 0.00 -
- Pembesian kg 12,814.22 - -
- Begesting Batako m2 51.93 - -
4 Balok Dasar Sloof
- Beton K 300 m3 20.22 - -
- Pembesian kg 3,279.50 - -
- Begesting 2x Pakai m2 107.01 - -
5 Dinding
- Beton K 300 m3 136.61 - -
- Pembesian kg 19,405.10 - -
- Begesting 2x Pakai m2 919.31 - -
- Pekerjaan Tie Rod pada Bekisting Vertikal m' 304.20 59,186.25 18,004,457.25
- Waterproofing m2 -
- Pekerjaan Water Stop PVC W=300 mm m' 394.71 - -
6 Kolom C1 Lantai Dasar
- Beton K 300 m3 22.04 - -
- Pembesian kg 2,892.56 - -
- Begesting 2x Pakai m2 125.60 - -
7 Balok Lantai 2
- Beton K 300 m3 8.20 - -
- Pembesian kg 1,349.18 - -
- Begesting 2x Pakai m2 71.73 - -
8 Plat Lantai
- Beton K 300 m3 3.90 - -
- Pembesian kg 1,242.82 - -
- Begesting 2x Pakai m2 38.13 - -
9 Beton Tangga
- Beton K 300 m3 0.51 - -
- Pembesian kg 147.16 - -
- Begesting 2x Pakai m2 4.34 - -
10 Beton Kolom Lantai 2
- Beton K 300 m3 12.76 - -
- Pembesian kg 1,996.20 - -
- Begesting 2x Pakai m2 96.58 - -
11 Balok Atap dan Lisplank
- Beton K 300 m3 19.5 - -
- Pembesian kg 3,512.68 - -
- Begesting 2x Pakai m2 147.77 - -
### 12 Plat Atap
- Beton K 300 m3 22.78 - -
- Pembesian kg 3,390.74 - -
- Begesting 2x Pakai m2 151.8 - -
13 Dudukan Pipa Header
- Beton K 300 m3 1.39 - -
- Pembesian kg 157.44 - -
- Begesting 2x Pakai m2 6.08 - -
14 Dudukan Pompa
- Beton K 300 m3 3.77 - -
- Pembesian kg 445.39 - -
- Begesting 2x Pakai m2 7.81 - -
Jumlah 2 18,004,457.25

3 Pekerjaan Pasangan dan Plesteran


1 Pekerjaan Pasangan Dinding Bata 1 : 4 m2 133.11 - -
2 Pekerjaan Plesteran Dinding Camp. 1 : 4 m2 313.18 - -
3 Pekerjaan Acian Dinding m2 497.21 - -
4 Pasangan Keramik 30x30 cm m2 10.28 - -
5 Pasangan Keramik 40 x 40 cm m2 51.67 - -
6 Pasangan Plin Keramik 10x40 cm m' 40.79 - -
7 Pekerjaan Expose Beton m2 724.10 112,500.00 81,461,250.00
8 Pekerjaan Waterproofing m2 201.03 - -
9 Pekerjaan Pasangan Bata Bata dan Paras Style Bali m2 71.29 427,910.93 713,184.88
10 Pekerjaan Ornamen Ukiran Style Bali m2 9.84 975,000.00 1,625,000.00
11 Pekerjaan Beton Sloope, Ring Balk & Kolom Praktis m3 1.12 - -
12 Pekerjaan Pasangan Pondasi Batu Kali 1 PC : 4 PS m3 4.43 - -
13 Pekerjaan Plafond Gypsum Rangka Hollow m2 13.53 - -
14 Pekerjaan list Plafond m' 16.53 - -
Jumlah 3 83,799,434.88

4 Pekerjaan Kusen, Pintu, Jendela dan Relling


1 Kusen Pintu dan Jendela Aluminium m' 66.930 - -
2 Pekerjaan Daun Pintu Panil Kaca Frame Aluminium m2 3.36 - -
3 Pekerjaan Daun Jendela Kaca Frame Aluminium m2 3.14 853,387.50 1,422,312.50
4 Pek. Relling Balkon dan Tangga m' 67.06 Err:509 Err:509
5 Pekerjaan Tangga Monyet set Err:509 Err:509
6 Pekerjaan Tangga Air Hujan m' 23.20 326,898.00 7,584,033.60
7 Pekerjaan Kusen Pintu Besi Profil C NP m2 5.70 - -
8 Pekerjaan Daun Pintu Besi rangka L 50.50.5 m2 2.94 - -
9 Pasang Grendel Tanam (Espagnolette) set 1.00 134,518.73 134,518.73
10 Pasang engsel Pintu baja AS.1 pasang 4.00 222,463.73 889,854.90
11 Pasang Kunci Pintu Baja pasang 1.00 432,013.73 432,013.73
12 Pasang Handle dan Kunci Pintu bh 585,000.00 -
18 Pekerjaan Tangga Inspeksi m 33.78 614,134.11 20,745,450.19
Jumlah 4 Err:509

5 Pekerjaan Cat
1 Meni dan Cat Besi m2 62.42 - -
2 Plamur dan Cat Tembok m2 449.08 - -
3 Pekerjaan Pengecatan Plafond m2 13.53 - -
Jumlah 5 -

I PEKERJAAN BANGUNAN PRASEDIMENTASI DAN AERATOR #REF!

HARGA PER LTR/DTK #REF!


1 Pekerjaan Tanah
1 Pengukuran dan Pasang Bowplank m' 103.90 - -
2 Galian Tanah dengan Excavator m3 685.05 - -
3 Galian Tanah Pondasi Plat Kaki dan Pondasi Menerus 766.79 - -
4 Urugan Tanah Kembali dengan Pemadatan m3 701.88 - -
5 Urugan Pasir m3 37.58 - -
Jumlah 1 -

2 Pekerjaan Beton
1 Pekerjaan Pondasi Bor Pile Ø 40 Cm
- Galian Tanah dengan Bor Ø 40 Cm m' 858.00 #REF! #REF!
- Cor Beton K-300 m3 107.76 - -
- besi Beton kg 9,867.73 - -
2 Lantai Kerja K 125 ( 1 pc : 3 ps : 5 Kr) m3 8.51 - -
3 Pondasi Beton Plat Kaki
- Beton K 300 m3 41.26 - -
- Pembesian kg 11,694.91 - -
- Begesting Batako m2 144.41 - -
4 Pekerjaan Beton Standing Coloum
- Beton K 300 m3 27.41 - -
- Pembesian kg 7,662.59 - -
- Begesting 2x Pakai m2 252.99 - -
5 Balok Dasar Sloof
- Beton K 300 m3 18.84 - -
- Pembesian kg 10,819.18 - -
- Begesting 2x Pakai m2 209.2 - -
6 Beton Kolom
- Beton K 300 m3 16.64 - -
- Pembesian kg 5,701.44 - -
- Begesting 2x Pakai m2 173.06 - -
7 Beton Balok
- Beton K 300 m3 39.37 - -
- Pembesian kg 11,442.96 - -
- Begesting 2x Pakai m2 376.40 - -
8 Beton Plat Lantai
- Beton K 300 m3 57.75 - -
- Pembesian kg 11,145.12 - -
- Begesting 2x Pakai m2 284.96 - -
### 9 Beton Plat Atap
- Beton K 300 m3 9.70 - -
- Pembesian kg 1,304.89 - -
- Begesting 2x Pakai m2 52.94 - -
- Expose Beton m2 236.37 112,500.00 26,591,625.00
10 Dinding
- Beton K 300 m3 65.94 - -
- Pembesian kg 18,208.20 - -
- Begesting 2x Pakai m2 814.11 - -
- Pekerjaan Tie Rod pada Bekisting Vertikal m' 221.00 59,186.25 13,080,161.25
- Waterproofing m2 186.60 - -
11 Beton Tangga
- Beton K 300 m3 2.26 - -
- Pembesian kg 1,451.77 - -
- Begesting 2x Pakai m2 39.11 - -
- Expose Beton m2 39.11 112,500.00 4,399,875.00
Jumlah 2 #REF!

3 Pekerjaan Pasangan dan Plesteran


1 Pekerjaan Pasangan Batu Kosong m3 1.65 - -
2 Pekerjaan Pasangan Batu Kali 1:4 m3 11.34 - -
3 Pekerjaan PasanganDinding Bata 1:2 m2 15.94 - -
4 Pekerjaan PasanganDinding Bata 1 PC : 4 Ps m2 260.09 - -
5 Pekerjaan Plesteran Dinding 1:2 m2 31.87 - -
6 Pekerjaan Plesteran Dinding 1 PC : 5 Ps m2 519.54 - -
7 Pekerjaan Acian Dinding m2 2,275.72 - -
8 Pekerjaan Water Proofing m2 1,061.72 - -
9 Pekerjaan Water Stop PVC W 300 mm m' 257.58 - -
10 Pek. Pasangan Bata/paras Gosok (Style Bali) m2 98.44 427,910.93 42,123,551.46
11 Ornamen Ukir Style Bali m2 0.24 975,000.00 234,000.00
12 Pekerjaan pengecetan dinding m2 1,034.88 - -
13 Pasangan keramik 40 x 40 m2 111.21 - -
14 Pekerjaan Pasangan Pepalihan Style Bali m2 259.11 427,910.93 110,875,999.78
15 Pekerjaan Plafond Gypsum Rangka Hollow m2 86.23 - -
16 Pekerjaan list Plafond m' 90.87 - -
17 Pengecatan Palfond m2 86.23 - -
18 Meni dan Cat Besi m2 74.56 - -
19 Pekerjaan Beton Sloope, Ring Balk & Kolom Praktis m3 2.11 - -
20 Pekerjaan Toilet
- Instalasi Plumbing Air Bersih m' 15.00 58,500.00 877,500.00
- Instalasi Plumbing Air Kotor m' 10.00 315,232.50 3,152,325.00
- Closet duduk m' 1.00 3,800,362.50 3,800,362.50
- Pasang Zink bh 1.00 2,925,037.50 2,925,037.50
- Pasang Floor Drain bh 1.00 439,395.00 439,395.00
- Pasang Kran air bh 2.00 308,775.00 617,550.00
- Pekerjaan Pas. Keramik dinding 20 x 60 m2 9.74 - -
- Pekerjaan Pas. Keramik lantai 30 x 30 m2 1.77 - -
- Pekerjaan Pas. Keramik plin 10 x 40 m2 70.97 - -
- Pekerjaan Septick Tank dan peresapan bh 1.00 2,500,000.00 2,500,000.00
Jumlah 3 167,545,721.23

4 Pekerjaan Kusen, Pintu, Jendela dan Relling


1 Pekerjaan Kusen Pintu dan Jendela Aluminium m' 71.040 - -
2 Pekerjaan Daun jendela kaca frame aluminium m2 9.23 853,387.50 7,876,766.63
3 Daun Pintu bingkai Allumunium m2 8.72 - -
4 Pekerjaan Pintu Harmonika m' 1.00 4,500,000.00 4,500,000.00
5 Pasang Engsel Pintu set 7.50 - -
6 Pasang Kunci Pintu m' 5.00 585,000.00 2,925,000.00
7 Pasang Engsel Jendela m2 8.00 - -
8 Pasang Grendel Jendela m2 8.00 - -
9 Pasang penutup manhole plat besi T=1.2 MM set 3.00 Err:509 Err:509
10 Pekerjaan Railing pasang 198.92 Err:509 Err:509
Jumlah 4 Err:509

II PEKERJAAN RESERVOAR DAN RUMAH POMPA #REF!

HARGA PER M3 #REF!


1 Pekerjaan Tanah
1 Galian Tanah dengan excavator m3 3,894.34 - -
2 Pengukuran dan Bouwplank m' 134.16 - -
3 Urugan Tanah Kembali dengan Pemadatan m3 379.58 - -
4 Urugan Pasir t = 10 cm m3 58.01 - -
Jumlah 1 -
2 Pekerjaan Beton
1 Pekerjaan Beton pondasi Plat kaki
- Beton Cor K-300 m3 2.52 - -
- besi Beton kg 504.00 - -
- Begesting Pasangan Batako 1:5 m2 8.40 - -
2 Pekerjaan Pondasi Bor Pile Ø 40 Cm
- Galian Tanah dengan Bor Ø 40 Cm m' 450.00 #REF! #REF!
- Cor Beton K-300 m3 56.52 - -
- besi Beton kg 8,002.33 - -
3 Pekerjaan Beton Pondasi plat keliling
- Beton Cor K-300 m3 47.24 - -
- besi Beton kg 10,116.67 - -
- Begesting Pasangan Batako 1:5 m2 68.92 - -
4 Lantai Kerja K - 125 (1 PC : 3 PS : 5KR) m3 29.62 - -
5 Plat Lantai Dasar
- Beton Cor K-300 m3 93.79 - -
- Pekerjaan Besi Beton kg 24,820.61 - -
- Begesting Pasangan Batako 1:5 m2 29.07 - -
6 Balok Sloope (TB 1)
- Beton Cor K-300 m3 31.82 - -
- Pekerjaan Besi Beton kg 7,484.34 - -
- Pekerjaan Begesting 2 X pakai m2 205.64 - -
7 Dinding Beton
- Beton Cor K-300 m3 184.20 - -
- Pekerjaan Besi Beton kg 47,043.34 - -
- Pekerjaan Begesting 2 X pakai m2 1,227.98 - -
- Pekerjaan Tie Rod pada Bekisting Vertikal m1 263.70 59,186.25 15,607,414.13
- Waterproofing integral m2 491.85 - -
8 Kolom C1 Lantai Dasar
- Beton Cor K-300 m3 29.43 - -
- Pekerjaan Besi Beton kg 6,944.94 - -
- Pekerjaan Begesting 2 X pakai m2 355.55 - -
9 Balok Lantai 1 (BL 1A & TB2)
- Beton Cor K-300 m3 20.37 - -
- Pekerjaan Besi Beton kg 4,995.10 - -
- Pekerjaan Begesting 2 X pakai m2 225.13 - -
10 Plat Lantai 1 (Atap Reservoar)
- Beton Cor K-300 m3 43.92 - -
- Pekerjaan Besi Beton kg 6,049.76 - -
- Pekerjaan Begesting 2 X pakai m2 321.85 - -
11 Balok Atap Ruang Pompa (BL 1C, BL 2, BL 3
- Beton Cor K-300 m3 13.74 - -
- Pekerjaan Besi Beton kg 3,761.03 - -
- Pekerjaan Begesting 2 X pakai m2 139.25 - -
12 Beton Plat Atap Ruang Pompa
- Beton Cor K-300 m3 25.28 - -
- Pekerjaan Besi Beton kg 6,111.90 - -
- Pekerjaan Begesting 2 X pakai m2 205.62 - -
13 Beton Listplank Ruang Pompa
- Beton Cor K-300 m3 2.20 - -
- Pekerjaan Besi Beton kg 417.58 - -
- Pekerjaan Begesting 2 X pakai m2 41.80 - -
14 Beton Tangga Ruang Pompa
- Beton Cor K-300 m3 2.39 - -
- Pekerjaan Besi Beton kg 616.98 - -
- Pekerjaan Begesting 2 X pakai m2 11.12 - -
15 Kolom C2 Ruang Kontrol
- Beton Cor K-300 m3 5.32 - -
- Pekerjaan Besi Beton kg 1,163.51 - -
- Pekerjaan Begesting 2 X pakai m2 74.25 - -
16 Balok Atap Ruang Kontrol
- Beton Cor K-300 m3 7.08 - -
- Pekerjaan Besi Beton kg 2,251.96 - -
- Pekerjaan Begesting 2 X pakai m2 91.56 - -
17 Plat Atap Ruang Kontrol
- Beton Cor K-300 m3 23.86 - -
- Pekerjaan Besi Beton kg 6,069.96 - -
- Pekerjaan Begesting 2 X pakai m2 136.19 - -
18 Beton Listplank Ruang Kontrol
- Beton Cor K-300 m3 2.69 - -
- Pekerjaan Besi Beton kg 507.63 - -
- Pekerjaan Begesting 2 X pakai m2 51.02 - -
19 Dudukan Pompa Backwash
- Beton Cor K-300 m3 1.78 - -
- Pekerjaan Besi Beton kg 316.72 - -
- Pekerjaan Begesting 2 X pakai m2 11.76 - -
20 Dudukan Pipa Header
- Beton Cor K-300 m3 12.90 - -
- Pekerjaan Besi Beton kg 686.65 - -
- Pekerjaan Begesting 2 X pakai m2 49.35 - -
21 Dudukan Pompa Centrifugal
- Beton Cor K-300 m3 3.77 - -
- Pekerjaan Besi Beton kg 445.39 - -
- Pekerjaan Begesting 2 X pakai m2 7.81 - -
Jumlah 2 #REF!

3 Pekerjaan Pasangan dan Pelapis


1 Pekerjaan Dinding Pasangan Bata 1:4 m2 376.76 - -
2 Pekerjaan Pondasi Batu Kali m3 21.05 - -
3 Pekerjaan Plesteran 1:4 m2 759.63 - -
4 Pekerjaan Acian Dinding m2 1,613.73 - -
5 Pekerjaan Expose Beton m2 349.28 112,500.00 39,294,000.00
6 Pekerjaan Water Proofing m2 1,209.02 - -
7 Pekerjaan Water Stop PVC W=300 mm m 367.70 - -
8 Pekerjaan Pasangan Bata dan Paras Style Bali m2 44.30 427,910.93 18,956,453.98
9 Pekerjaan Pasangan Pepalihan Style Bali m2 177.86 427,910.93 76,109,092.94
10 Ornamen ukir style bali m2 10.64 975,000.00 10,374,000.00
11 Pekerjaan Beton Sloope, Ring Balk & Kolom Praktis m3 1.82 - -
12 Pekerjaan Pas. Keramik Lantai 40 x 40 m2 267.11 - -
13 Pekerjaan Pas. Keramik lantai 30 x 30 m2 38.76 - -
14 Pekerjaan Pas. Keramik plin 10 x 40 m1 210.85 - -
Jumlah 3 144,733,546.92

4 Pekerjaan Kusen Pintu dan Jendela


1 Pekerjaan Kusen Pintu dan Jendela Aluminium m 97.30 - -
2 Pek. Daun Pintu Panil Kaca Frame Aluminium m2 10.27 - -
3 Pek Daun Jendela Kaca Frame Aluminium m2 7.40 853,387.50 6,315,067.50
4 Pasang Engsel Pintu pasang 8.50 - -
5 Pasang Engsel Jendela pasang 6.00 - -
6 Pasang Kunci Pintu pasang 4.00 585,000.00 2,340,000.00
7 Pasang Grendel Jendela pasang 6.00 - -
8 Pasang Grendel Pintu Baja set 6.00 134,518.73 807,112.35
9 Pekerjaan Kusen Pintu Besi Profil CNP m 19.90 - -
10 Pekerjaan daun Pintu Besi Rangka L.50.50.5 m2 12.93 - -
11 Pasang engsel Pintu baja AS.1 pasang 13.00 222,463.73 2,892,028.43
12 Pasang Kunci Pintu Baja pasang 3.00 432,013.73 1,296,041.18
13 Pasang grendel tanam untuk pintu baja set 3.00 134,518.73 403,556.18
14 Pasang penutup manhole plat besi T=1.2 MM unit 4.00 Err:509 Err:509
15 Talang Air Hujan m 42.44 326,898.00 13,873,551.12
16 Baut Angkur M22 Penjangkaran 1000 mm bh 40.00 129,419.40 5,176,776.00
17 Pekerjaan Baja Profil I WF kg 1,101.00 - -
18 Pekerjaan Plafond Gypsum Rangka Hollow m2 55.86 - -
19 Pekerjaan list Plafond m 37.70 - -
20 Pekerjaan Tangga Inspeksi Pipa GIP Unit 4.00 Err:509 Err:509
21 Railling Balkon dan Tangga (Pipa Black Steel) m' 34.19 Err:509 Err:509
22 Pekerjaan Daun Jendela Jalusi m2 6.60 250,000.00 1,650,000.00
Jumlah 4 Err:509

5 Pekerjaan Finishing
1 Pekerjaan pengecatan dinding luar m2 320.88 - -
2 Pekerjaan pengecatan dinding dalam m2 998.57 - -
3 Pekerjaan Pengecatan Plafond m2 55.86 - -
4 Meni dan Cat Besi m2 47.80 - -
Jumlah 5 -
III PEKERJAAN BANGUNAN PENGELOLA Err:509

HARGA PER M2 Err:509


1 Pekerjaan Tanah
1 Galian Tanah dengan excavator m3 3,894.34 - -
2 Pengukuran dan Bouwplank m' 134.16 - -
3 Urugan Tanah Kembali dengan Pemadatan m3 379.58 - -
4 Urugan Pasir t = 10 cm m3 58.01 - -
Jumlah 1 -
2 Pekerjaan Beton
1 Pekerjaan Beton Rabat Campuran 1 Pc : 3 Ps : 5 Kr m3 4.91 - -
2 Pekerjaan Beton Pondasi Plat Kaki R. Pengelola
- Beton Cor K-300 m3 9.07 - -
- Pekerjaan Besi Beton Kg 1,162.15 - -
- Pekerjaan Begesting 2 X pakai m2 30.24 - -
3 Beton Kolom Lt 1 R. Pengelola
- Beton Cor K-300 m3 9.73 - -
- Pekerjaan Besi Beton Kg 2,040.45 - -
- Pekerjaan Begesting 2 X pakai m2 129.70 - -
4 Balok Sloof ( S1 dan SP ) R. Pengelola
- Beton Cor K-300 m3 6.67 - -
- Pekerjaan Besi Beton Kg 1,838.41 - -
- Pekerjaan Begesting 2 X pakai m2 54.65 - -
5 Balok Lantai 1 ( B1 & TP ) R.Pengelola
- Beton Cor K-300 m3 6.93 - -
- Pekerjaan Besi Beton Kg 2,180.54 - -
- Pekerjaan Begesting 2 X pakai m2 79.90 - -
6 Beton Balok Lt.2 R. Pengelola
- Beton Cor K-300 m3 5.63 - -
- Pekerjaan Besi Beton Kg 1,153.03 - -
- Pekerjaan Begesting 2 X pakai m2 59.67 - -
7 Beton Plat Lantai 2 R. Pengelola
- Beton Cor K-300 m3 9.52 - -
- Pekerjaan Besi Beton Kg 1,480.58 - -
- Pekerjaan Begesting 2 X pakai m2 79.33 - -
8 Beton Plat Lantai 2 R. Pengelola ( T10-01)
- Beton Cor K-300 m3 6.31 - -
- Pekerjaan Besi Beton Kg 606.63 - -
- Pekerjaan Begesting 2 X pakai m2 91.08 - -
9 Beton Tangga R. Pengelola
- Beton Cor K-300 m3 2.63 - -
- Pekerjaan Besi Beton Kg 762.98 - -
- Pekerjaan Begesting 2 X pakai m2 20.78 - -
10 Beton Kolom Lt 2 R. Pengelola
- Beton Cor K-300 m3 6.44 - -
- Pekerjaan Besi Beton Kg 1,367.89 - -
- Pekerjaan Begesting 2 X pakai m2 85.85 - -
11 Beton Ring Balok R. Pengelola
- Beton Cor K-300 m3 2.89 - -
- Pekerjaan Besi Beton Kg 642.62 - -
- Pekerjaan Begesting 2 X pakai m2 31.35 - -
12 Beton Kolom Praktis R. Pengelola
- Beton Cor K-300 m3 0.81 - -
- Pekerjaan Besi Beton Kg 267.29 - -
- Pekerjaan Begesting 2 X pakai m2 21.56 - -
Jumlah 2 -

3 Pekerjaan Pasangan dan Dinding


1 Pekerjaan Dinding Pasangan Bata 1:4 m2 272.67 - -
2 Pekerjaan Dinding Pasangan Bata 1:2 m2 39.10 - -
3 Pekerjaan Plesteran 1:4 m2 545.34 - -
4 Pekerjaan Plesteran 1:2 m2 78.20 - -
5 Pekerjaan Acian Dinding m2 623.54 - -
6 Pekerjaan Pas. Keramik Lantai 40 x 40 m2 149.56 - -
7 Pekerjaan lantai keramik stepnozing m1 24.50 55,097.63 1,349,891.81
8 Pek. Pasangan Bata/paras Gosok (Style Bali) m2 105.40 427,910.93 45,102,667.32
9 Ornamen ukir style bali m2 13.93 975,000.00 13,577,070.00
10 Pekerjaan Pasangan Batu Kosong m3 14.04 - -
11 Pekerjaan Pondasi Batu Kali m3 45.59 - -
12 Pekerjaan Pas. Keramik dinding 20 x 60 m2 33.13 - -
13 Pek. Pas Keramik Lantai 30 x 30 Cm m2 6.56 - -
14 Pekerjaan Pas. Keramik plin 10 x 40 m1 110.46 - -
15 Pekerjaan Pasangan Pepalihan Style Bali m2 219.86 427,910.93 94,081,030.86
Jumlah 3 154,110,659.99

4 Pekerjaan Kusen, Pintu dan Jendela


1 Pekerjaan Kusen Pintu dan Jendela Aluminium m 203.00 - -
2 Pekerjaan Kusen Pintu Kayu Kamfer m³ 5.65 - -
3 Talang air hujan m 17.18 326,898.00 5,616,107.64
4 Daun Pintu bingkai Allumunium m2 14.81 - -
5 Daun Pintu Kamfer m2 2.57 - -
6 Jendela Kaca Bingkai Alumunium m2 42.04 853,387.50 35,872,996.95
7 Pasang Engsel Pintu pasang 20.00 - -
8 Pasang Engsel Jendela pasang 32.00 - -
9 Pasang Kunci Pintu pasang 8.00 585,000.00 4,680,000.00
10 Pasang Grendel Jendela pasang 32.00 - -
11 Pasang Kait Angin pasang 32.00 - -
Jumlah 4 46,169,104.59
5 Pekerjaan Atap dan Plafond
1 Pekerjaan Kuda-Kuda Baja Profil kg 7,036.47 - -
2 Jarum Keras bh 4.00 22,500.00 90,000.00
3 Treckstang m' 26.88 37,455.63 1,006,807.33
4 Baut Angkur M22 Penjangkaran 1000 mm bh 56.00 129,419.40 7,247,486.40
5 Plat Andas 300 x 300 x 18 mm bh 14.00 430,342.32 6,024,792.54
6 Pasang Rangka Usuk dan Reng Kayu Kamfer m2 215.44 - -
7 Pasang Atap Genteng Keramik glasur m2 247.95 - -
8 Pasang Genteng Bubungan Keramik glasur m 56.93 - -
9 Pek. Pasang Listplank Kayu kanfer Profil m 72.80 - -
10 Murda Paras Ukir unit 3.00 - -
11 Ikut Celedu Paras Ukir unit 8.00 - -
12 Pekerjaan Plafond Gypsum Rangka Hollow m2 135.38 - -
13 Pekerjaan list Plafond m 152.78 - -
14 Pekerjaan Railing Tangga dan Balkon (Stainless Steel) m 8.87 Err:509 Err:509
15 Pek. Lambesering m2 72.21 - -
16 Pek. List Plafond Lambesering m 67.12 - -
Jumlah 5 Err:509

6 Pekerjaan Finishing
1 Pekerjaan Pengecatan Dinding Luar m2 201.79 - -
2 Pekerjaan Pengecatan Dinding Dalam m2 478.79 - -
3 Pekerjaan Pengecatan Plafond m2 135.38 - -
4 Pekerjaan Polituran Listplank m2 73.33 - -
5 Pekerjaan Pengecatan Rangka Baja m2 343.60 - -
6 Pekerjaan Polituran Lambesering m2 72.21 - -
Jumlah 6 -

7 Pekerjaan Toilet
1 Instalasi Plumbing Air Bersih m 25.00 58,500.00 1,462,500.00
2 Instalasi Plumbing Air Kotor m 36.00 315,232.50 11,348,370.00
3 Closet duduk bh 2.00 3,800,362.50 7,600,725.00
4 Pasang Washtafel set 2.00 1,737,336.15 3,474,672.30
5 Pasang Floor Drain set 2.00 439,395.00 878,790.00
6 Pasang Kran air set 4.00 308,775.00 1,235,100.00
Jumlah 7 26,000,157.30

I BANGUNAN KIMIA 133,230,677.39

HARGA PER M2 607,693.29


1 Pekerjaan Tanah
1 Pengukuran dan Pasang Bowplank m' 81.57 - -
2 Galian Tanah dengan Excavator m3 50.00 - -
3 Galian Tanah Pondasi Foot Plat dan Pondasi Menerus m3 441.92 - -
4 Urugan Tanah Kembali dengan Pemadatan m3 336.06 - -
5 Urugan Pasir m3 33.41 - -
Jumlah 1 -

2 Pekerjaan Beton
1 Lantai Kerja K 125 ( 1 pc : 3 ps : 5 Kr) m3 12.61 - -
2 Pondasi Beton Plat Kaki
- Beton K 300 m3 8.24 - -
- Pembesian kg 2,071.91 - -
- Begesting Batako m2 26.40 - -
3 Beton Standing Colum
- Beton K 300 m3 4.73 - -
- Pembesian kg 1,712.90 - -
- Begesting 2x Pakai m2 63.00 - -
4 Balok Dasar Sloof
- Beton K 300 m3 13.66 - -
- Pembesian kg 3,403.30 - -
- Begesting 2x Pakai m2 96.03 - -
5 Beton Kolom
- Beton K 300 m3 10.46 - -
- Pembesian kg 2,223.57 - -
- Begesting 2x Pakai m2 139.95 - -
6 Beton Balok
- Beton K 300 m3 22.00 - -
- Pembesian kg 4,898.65 - -
- Begesting 2x Pakai m2 147.46 - -
### 7 Plat Atap
- Beton K 300 m3 29.72 - -
- Pembesian kg 3,308.07 - -
- Begesting 2x Pakai m2 247.64 - -
8 Beton Dudukan Tabung dan Bak Pencampur
- Beton K 300 m3 32.34 - -
- Pembesian kg 2,584.84 - -
- Begesting 2x Pakai m2 114.64 - -
9 Beton Kolom dan Sloop Praktis
- Beton K 300 m3 1.49 - -
- Pembesian kg 422.20 - -
- Begesting 2x Pakai m2 20.50 - -
10 Beton Lisplank
- Beton K 300 m3 4.02 - -
- Pembesian kg 1,031.04 - -
- Begesting 2x Pakai m2 67.00 - -
Jumlah 2 -
3 Pekerjaan Pasangan dan Pelapis
1 Pekerjaan Pasangan Batu Kosong m3 25.61 - -
2 Pekerjaan Pasangan Batu Kali 1:4 m3 43.21 - -
3 Pekerjaan PasanganDinding Bata 1:2 m2 25.71 - -
4 Pekerjaan PasanganDinding Bata 1 PC : 4 Ps m2 278.97 - -
5 Pekerjaan Plesteran Dinding 1:2 m2 51.20 - -
6 Pekerjaan Plesteran Dinding 1 PC : 5 Ps m2 560.82 - -
7 Pekerjaan Acian Dinding m2 823.54 - -
8 Pekerjaan Pasangan Keramik Lantai 40 x 40 cm m2 186.83 - -
9 Pekerjaan Water Proofing m2 327.68 - -
10 Pek. Pasangan Bata/paras Gosok (Style Bali) m2 39.68 427,910.93 16,977,793.86
11 Pekerjaan Pasangan Pepalihan Style Bali m2 129.32 427,910.93 55,338,724.55
12 Ornamen ukir style bali m2 5.84 975,000.00 5,694,000.00
13 Pekerjaan Lapisan Fiber Glass (2 x Lapis) m2 129.76 230,813.00 29,950,294.88
14 Pekerjaan Plafond Gypsum Rangka Hollow m2 210.84 - -
15 Pekerjaan list Plafond m 113.80 - -
16 Pek. Pasangan Keramik Dinding KM 20 x 25 Cm m2 66.59 - -
17 Pekerjaan Beton Sloope, Ring Balk & Kolom Praktis m3 2.70 - -
18 Pekerjaan Toilet
- Instalasi Plumbing Air Bersih m 20.00 58,500.00 1,170,000.00
- Instalasi Plumbing Air Kotor m 15.00 315,232.50 4,728,487.50
- Closet duduk bh 1.00 3,800,362.50 3,800,362.50
- Pasang Washtafel set 1.00 1,737,336.15 1,737,336.15
- Pasang Floor Drain set 1.00 439,395.00 439,395.00
- Pasang Kran air set 1.00 308,775.00 308,775.00
- Pekerjaan Pas. Keramik dinding 20 x 60 m2 11.94 - -
- Pekerjaan Pas. Keramik plin 10 x 40 m1 55.68 - -
- Pekerjaan Pas. Keramik lantai 30 x 30 m2 33.53 - -
- Pekerjaan Septick Tank dan peresapan unit 1.00 2,500,000.00 2,500,000.00
- Pompa Air Bersih unit 1.00 1,750,000.00 1,750,000.00
Jumlah 3 124,395,169.44

4 Pekerjaan Kusen, Pintu, Jendela dan Relling


1 Pekerjaan Kusen Pintu dan Jendela Aluminium m 78.310 - -
2 Pekerjaan Daun Pintu Aluminium m2 5.40 - -
3 Pekerjaan Daun Jendela Aluminium Panil Kaca m2 2.46 853,387.50 2,099,333.25
4 Pekerjaan Daun Jendela Jalusi m2 9.95 250,000.00 2,487,500.00
5 Pekerjaan Kusen Pintu Besi Profil C NP m 19.80 - -
6 Pekerjaan Daun Pintu Besi rangka L 50.50.5 m2 23.01 - -
7 Pasang Engsel Pintu pasang 4.50 - -
8 Pasang Engsel Jendela pasang 2.00 - -
9 Pasang Kunci Pintu pasang 3.00 585,000.00 1,755,000.00
10 Pasang Grendel Jendela pasang 1.00 - -
11 Pasang Kait Angin pasang 2.00 - -
12 Pasang Engsel Pintu baja As 1" pasang 8.00 222,463.73 1,779,709.80
13 Pasang Kunci Pintu Baja pasang 2.00 222,463.73 444,927.45
14 Pasang Grendel Tanam untuk Pintu baja Set 2.00 134,518.73 269,037.45
15 Pasang Kait Angin bh 36.00 - -
Jumlah 4 8,835,507.95

5 Pekerjaan Cat
1 Meni dan Cat Besi m2 28.32 - -
2 Plamur dan Cat Tembok m2 775.80 - -
3 Pekerjaan Pengecatan Plafond m2 210.84 - -
Jumlah 5 -

I PEKERJAAN BANGUNAN IPAL Err:509

HARGA PER LTR/DTK Err:509


1 Pekerjaan Tanah
1 Pengukuran dan Pasang Bowplank m' 83.20 - -
2 Galian Tanah dengan Excavator m3 644.07 - -
3 Urugan Tanah Kembali dengan Pemadatan m3 77.75 - -
4 Urugan Pasir m3 282.10 - -
5 Kerikil Halus gradasi butiran Ø 0.3 - 1.75 Cm m3 44.32 300,447.00 13,316,562.16
6 Pasir Halus gradasi butiran Ø 0.4 - 0.7 mm m3 46.80 263,188.50 12,317,221.80
Jumlah 1 25,633,783.96

2 Pekerjaan Beton
1 Lantai Kerja K 125 ( 1 pc : 3 ps : 5 Kr) m3 11.46 - -
2 Beton Plat Lantai
- Beton K 300 m3 65.09 - -
- Pembesian kg 6,979.94 - -
3 Pekerjaan Beton Dinding dan Saluran
- Beton K 300 m3 53.19 - -
- Pembesian kg 8,766.01 - -
- Begesting 2x Pakai m2 412.29 - -
Jumlah 2 -

3 Pekerjaan Lain-Lain
1 Pekerjaan Baja Profil I WF 250 X 125 X 5 mm Kg 807.47 - -
2 Pekerjaan Baja Profil I NP 60 Kg 177.24 - -
3 Pekerjaan Grill Penutup Besi strip 30 x 3 mm m2 14.03 3,000,000.00 42,090,000.00
4 Pekerjaan Pintu Air Unit 9.00 20,910,000.00 188,190,000.00
5 Baut Angkur M22 Penjangkaran 1000 mm bh 24.00 129,419.40 3,106,065.60
6 Plat Andas 300 x 300 x 18 mm bh 6.00 430,342.32 2,582,053.95
7 Railling Balkon dan Tangga (Pipa Black Steel) m' 37.29 Err:509 Err:509
8 Meni dan Cat Besi m2 41.58 - -
Jumlah 3 Err:509
I PEKERJAAN IPA #REF!

HARGA PER LTR/DTK #REF!


1 Pekerjaan Tanah
1 Pengukuran dan Pasang Bowplank m' 132.70 - -
2 Galian Tanah dengan Excavator m3 3,838.17 - -
3 Galian Tanah Pondasi Plat Kaki dan Pondasi Menerus m3 436.89 - -
4 Urugan Tanah Kembali dengan Pemadatan m3 6.00 - -
5 Urugan Pasir m3 82.62 - -
Jumlah 1 -

2 Pekerjaan Pasangan dan Beton


1 Pekerjaan Pasangan Batu Kosong m3 4.45 - -
2 Pekerjaan Pasangan Batu Kali Campuran 1 : 4 m3 7.08 - -
3 Lantai Kerja K 125 ( 1 pc : 3 ps : 5 Kr) m3 28.84 - -
4 Pekerjaan Beton Bor Pile
- Galian Tanah dengan Bor m' 200.00 #REF! #REF!
- Beton K 300 m3 20.34 - -
- Pembesian kg 3,743.16 - -
5 Pekerjaan Beton Pondasi Plat Kaki
- Beton K 300 m3 75.61 - -
- Pembesian kg 14,190.63 - -
- Begesting Batako m2 493.66 - -
6 Pekerjaan Beton Standing Colum
- Beton K 300 m3 0.84 - -
- Pembesian kg 111.59 - -
- Begesting 2x Pakai m2 5.34 - -
7 Pekerjaan Beton Sloop
- Beton K 300 m3 0.84 - -
- Pembesian kg 111.59 - -
- Begesting 2x Pakai m2 5.34 - -
8 Pekerjaan Beton Lantai
- Beton K 300 m3 251.65 - -
- Pembesian kg 59443.97 - -
- Begesting 2x Pakai m2 54.57 - -
9 Pekerjaan Beton Dinding, Gutter, dan Plat Jalan Setapak
- Beton K 300 m3 839.30 - -
- Pembesian kg 100,032.99 - -
- Begesting 2x Pakai m2 4,883.65 - -
- Tie Rot m' 978.00 59,186.25 57,884,152.50
- Water Sttop W 300 mm m' 1,267.14 - -
10 Pekerjaan Beton Balok
- Beton K 300 m3 21.26 - -
- Pembesian kg 3,645.15 - -
- Begesting 2x Pakai m2 445.69 - -
11 Pekerjaan Beton Plat Atap
- Beton K 300 m3 79.95 - -
- Pembesian kg 7,619.59 - -
- Begesting 2x pakai m2 316.12 - -
12 Pekerjaan Acian Dinding m2 1,193.70 - -
Jumlah 2 #REF!

3 PEKERJAAN RANGKA BAJA DAN ATAP


1 Pekerjaan Rangka Atap Baja WF kg 8,447.39 - -
2 Pekerjaan Gording Canal kg 2,332.84 - -
3 Pekerjaan Atap Genteng m2 273.81 - -
4 Pekerjaan Bubungan m' 47.53 - -
5 Pekerjaan Relling Tangga dan Balkon m 383.73 Err:509 Err:509
6 Plat Andas bh 14.00 430,342.32 6,024,792.54
7 Baut Angkur M22 Penjangkaran 1000 mm bh 56.00 129,419.40 7,247,486.40
8 Jarum Keras bh 12.00 22,500.00 270,000.00
9 Treckstank m' 58.83 37,455.63 2,203,514.71
10 Pekerjaan Pasang Lisplank m' 92.54 - -
11 Pekerjaan Usuk dan Reng Baja Ringan m2 273.81 283,932.72 77,743,617.35
12 Mur baut A 325 M 20 set 200.00 54,229.50 10,845,900.00
13 Mur baut A 325 M 16 set 698.00 40,170.00 28,038,660.00
14 Mur baut NC M 12 set 312.00 32,250.00 10,062,000.00
15 Mur NC M 12 set 216.00 17,250.00 3,726,000.00
16 Pengadaan dan Pemasangan Extended Stem Valve Unit 12.00 3,250,312.50 39,003,750.00
Jumlah 3 Err:509

4 Pekerjaan Kusen Pintu dan Jendela


12 Pekerjaan Penutup Man Hole Plat Besi T=1,2 mm bh 7.00 Err:509 Err:509
13 Pekerjaan Grill Penutup Besi Strip 30x3 mm m2 25.89 3,000,000.00 77,670,000.00
Jumlah 4 Err:509
5 Pekerjaan Finishing
1 Pekerjaan Pengecatan Dinding m2 - -
2 Pekerjaan Politur Lisplank m2 69.41 - -
3 Pekerjaan Pengecatan Rangka Baja m2 459.97 - -
4 Pekerjaan Pasangan Style Bali m2 975,000.00 -
5 Ornamen Ukir Style Bali m2 15.24 975,000.00 14,859,000.00
6 Pekerjaan Waterproofing m2 1,818.86 - -
7 Pekerjaan Pasangan Keramik Lantai m2 18.43 - -
8 Meni dan Cat Besi m2 - -
9 Pekerjaan Lapis Keramik pada Gutter m2 94.64 - -
Jumlah 5 14,859,000.00

I PEKERJAAN BANGUNAN GENSET 129,234,049.25


HARGA PER M2 1,284,313.53
1 Pekerjaan Tanah
1 Pengukuran dan Pasang Bowplank m' 50.65 - -
2 Galian Tanah dengan excavator m3 354.93 - -
3 Urugan Tanah Kembali dengan Pemadatan m3 224.44 - -
4 Urugan Pasir di bawah lantai m3 13.93 - -
5 Urugan Pasir di bawah Pondasi t = 10 cm m3 38.00 - -
Jumlah 1 -

2 Pekerjaan Pasangan dan Beton


1 Pekerjaan Pasangan Batu Kosong m3 8.40 - -
2 Pekerjaan Pasangan Pondasi Batu Kali m3 42.10 - -
3 Pekerjaan Beton Rabat Camp. (1 PC : 3 PS : 5KR)
- Cor Beton Camp 1:3:5 m3 7.01 - -
4 Pekerjaan Beton pondasi Plat kaki
- Beton Cor K-300 m3 5.83 - -
- besi Beton Kg 2,974.19 - -
- Begesting Pasangan Batako 1:5 m2 15.36 - -
5 Pekerjaan Beton Sloope
- Beton Cor K-300 m3 5.04 - -
- besi Beton Kg 1,126.08 - -
- Begesting 2 X pakai m2 33.60 - -
6 Pekerjaan Beton Kolom
- Beton Cor K-300 m3 8.33 - -
- besi Beton Kg 2,121.56 - -
- Begesting 2 X pakai m2 105.18 - -
7 Pekerjaan Beton Lantai Dan Pondasi Genset
- Beton Cor K-300 m3 16.49 - -
- besi Beton Kg 270.78 - -
8 Pekerjaan Beton Balok Atap
- Beton Cor K-300 m3 11.42 - -
- besi Beton Kg 1,964.15 - -
- Begesting 2 X pakai m2 80.86 - -
9 Pekerjaan Beton Plat Atap
- Beton Cor K-300 m3 15.01 - -
- besi Beton Kg 2,016.08 - -
- Begesting 2 X pakai m2 124.82 - -
10 Pekerjaan Beton Listplank
- Beton Cor K-300 m3 3.10 - -
- besi Beton Kg 698.79 - -
- Begesting 2 X pakai m2 50.09 - -
11 Kolom Praktis dan Balok Latei
- Beton Cor K-300 m3 1.07 - -
- besi Beton Kg 224.43 - -
- Begesting 2 X pakai m2 21.38 - -
12 Pekerjaan Pasangan Dinding Bata 1 Pc : 4 Ps m3 197.50 - -
13 Pekerjaan Plesteran Dinding 1 Pc : 4 Ps m3 298.12 - -
14 Pekerjaan Acian Dinding m3 474.25 - -
15 Pekerjaan Water Proofing ( Atap ) m2 161.84 - -
16 Pekerjaan Beton Sloope, Ring Balk & Kolom Praktis m3 0.90 - -
17 Pekerjaan Pas. Keramik Lantai 30 x 30 m2 21.43 - -
Jumlah 2 -

3 Pekerjaan Kusen Pintu dan Jendela


1 Pekerjaan Kusen Pintu dan Jendela Aluminium m 21.60 - -
2 Pekerjaan Daun Jendela Jalusi m2 10.37 250,000.00 2,592,500.00
3 Pekerjaan Kusen Pintu Besi Profil C NP 140 x 60 x 7 mm m 29.63 - -
4 Pekerjaan Pintu Plat baja 2 sisi dalamnya Glass wool m2 13.68 - -
5 Pasang Engsel Pintu baja As 1" pasang 18.00 222,463.73 4,004,347.05
6 Pasang Kunci Pintu Baja pasang 4.00 222,463.73 889,854.90
7 Pasang Grendel Tanam untuk Pintu baja Set 4.00 134,518.73 538,074.90
8 Talang Air Hujan m' 20.80 326,898.00 6,799,478.40
9 Baut Angkur M22 Penjangkaran 1000 mm bh 10.00 129,419.40 1,294,194.00
Jumlah 3 16,118,449.25

4 Pekerjaan Finishing
1 Pekerjaan Pengecatan Dinding (Plamuur dan Cat Tembok) m2 437.28 - -
2 Pekerjaan Pasangan Style Bali m2 25.90 975,000.00 25,248,600.00
3 Pekerjaan Pasangan Pepalihan Style Bali m2 90.12 975,000.00 87,867,000.00
Jumlah 4 113,115,600.00

PEKERJAAN JEMBATAN PIPA Err:509

HARGA PER M' Err:509


1 Pondasi Abutment
- Beton Cor K-300 m3 8.11 - -
- besi Beton Kg 1,883.10 - -
- Begesting 2 X pakai m2 27.15 - -
2a Jembatan Double Profil WF 500.200 m 8.00 13,907,537.26 111,260,298.07
3 Wash Out
- Pasang penutup manhole plat besi T=1.2 MM unit 4.00 Err:509 Err:509
5 Galian Tanah dengan excavator m3 51.83 - -
6 Urugan Tanah dengan Pemadatan m3 46.08 - -
7 Pek. Urugan Sirtu Dipadatkan m3 1.57 158,977.50 249,594.68
8 Beton Camp. 1smn : 3 psr : 5 krl m³ 0.78 - -
9 Pek. Box Culvert Beton Bertulang 100 x 100 Cm (untuk air valve) m 5.20 5,550,000.00 28,860,000.00
Jumlah 7 Err:509

BANGUNAN RESERVOIR DISTRIBUSI BUDUK #REF!


HARGA PER M3 #REF!
1 Pekerjaan Tanah
1 Pengukuran dan Pasang Bowplank m' 158.30 - -
2 Galian Tanah dengan excavator m3 2,251.50 - -
3 Galian Tanah dengan excavator m3 2,899.42 - -
4 Urugan Tanah Kembali dengan Pemadatan m3 237.40 - -
5 Urugan Tanah Kembali dengan Pemadatan m3 4,135.33 - -
6 Urugan Pasir t = 10 cm m3 399.02 - -
Jumlah 1 -
2 PEKERJAAN BETON
1 Pekerjaan Pondasi Bor Pile
- Pembuatan lubang Bor Pile Ø 40 cm m 970.00 #REF! #REF!
- Beton Cor K-300 m3 121.83 - -
- besi Beton Kg 22,542.89 - -
2 Lantai Kerja K - 125 (1 PC : 3 PS : 5KR)
- Cor Beton Camp 1:3:5 m3 69.32 - -
3 Pekerjaan Beton pondasi Plat Setempat & Keliling
- Beton Cor K-300 m3 82.15 - -
- besi Beton Kg 17,083.27 - -
- Begesting Pasangan Batako m2 140.40 - -
4 Pekerjaan Sloof
- Beton Cor K-300 m3 70.47 - -
- Pekerjaan Besi Beton Kg 15,291.91 - -
- Begesting Pasangan Batako m2 491.54 - -
5 Pekerjaan Beton Lantai Tebal 30 Cm
- Beton Cor K-300 m3 206.52 - -
- besi Beton Kg 68,537.48 - -
- Begesting Pasangan Batako m2 44.58 - -
6 Pekerjaan Beton Kolom 40 x 40 Cm
- Beton Cor K-300 m3 64.63 - -
- besi Beton Kg 17,762.91 - -
- Begesting 2 X pakai m2 702.72 - -
7 Pekerjaan Beton Dinding Luar Tebal 30 Cm
- Beton Cor K-300 m3 226.42 - -
- besi Beton Kg 53,884.03 - -
- Begesting 2 X pakai m2 1,509.46 - -
- Pekerjaan Tie Rod pada Bekisting Vertikal m1 626.40 59,186.25 37,074,267.00
- Waterproofing integral m3 1,018.95 - -
8 Pekerjaan Beton Dinding Penyekat Dalam
- Beton Cor K-300 m3 93.98 - -
- besi Beton Kg 35,800.86 - -
- Begesting 2 X pakai m2 626.52 - -
9 Pekerjaan Beton Balok Atap
- Beton Cor K-300 m3 80.26 - -
- besi Beton Kg 16,526.99 - -
- Begesting 2 X pakai m2 735.60 - -
10 Pekerjaan Beton Plat Atap
- Beton Cor K-300 m3 187.08 - -
- besi Beton Kg 31,349.02 - -
- Begesting 2 X pakai m2 1,057.48 - -
11 Pekerjaan Beton Listplang
- Beton Cor K-300 m3 7.44 - -
- besi Beton Kg 1,173.43 - -
- Begesting 2 X pakai m2 141.38 - -
12 Pekerjaan Tangga
- Beton Cor K-300 m3 3.96 - -
- besi Beton Kg 1,140.60 - -
- Begesting 2 X pakai m2 33.39 - -
Jumlah 2 #REF!

3 PEKERJAAN PASANGAN DAN PELAPIS


1 Pekerjaan PasanganPondasi Batu Kali m3 46.98 - -
2 Pekerjaan Pas, Dinding Bata Merah m2 83.25 - -
3 Pekerjaan Pas, Dinding Bata Merah m2 524.11 - -
4 Pekerjaan Water Proofing m2 2,082.38 - -
5 Pekerjaan Water Stop m 316.54 - -
6 Pekerjaan Water Stop m 749.81 - -
7 Pekerjaan Plesteran 1 PC : 2 Ps m2 1,214.72 - -
8 Pekerjaan Acian m2 166.50 - -
9 Pekerjaan Acian m2 2,180.29 - -
10 Pekerjaan expose beton m2 93.60 112,500.00 10,530,000.00
11 Meni dan cat besi m2 64.21 - -
Jumlah 3 10,530,000.00

4 PEKERJAAN KUSEN PINTU DAN RELING


1 Pekerjaan Kusen Pintu Baja Profil L 70.70.6 m2 14.72 - -
2 Pekerjaan Daun Pintu Besi rangka L 50.50.5 m2 6.25 - -
3 Pekerjaan Daun Pintu Besi rangka L 50.50.5 m2 4.47 - -
4 Pasang Engsel Pintu baja As 1" pasang 8.00 222,463.73 1,779,709.80
5 Pasang Kunci Pintu Baja set 2.00 432,013.73 864,027.45
6 Pasang Grendel Tanam untuk Pintu baja pasang 2.00 134,518.73 269,037.45
7 Pekerjaan Pipa Ventilasi GIP 4" Unit 4.00 750,000.00 3,000,000.00
8 Pekerjaan Penutup Man Hole Plat Besi T= 1.2 mm Unit 6.00 Err:509 Err:509
9 Pekerjaan Penutup Man Hole Plat Besi T= 1.2 mm Unit 2.00 Err:509 Err:509
10 Pekerjaan Tangga Inspeksi Pipa GIP Unit 2.00 Err:509 Err:509
11 Talang Air Hujan set 27.01 - -
12 Pekerjaan Beton Sloope, Ring Balk & Kolom Praktis m3 4.73 - -
13 Railling Balkon dan Tangga (Pipa Black Steel) m' 149.08 Err:509 Err:509
Jumlah 4 Err:509
REKAPITULASI BIAYA KONSTRUKSI
JARINGAN PIPA
SPAM TITAB KABUPATEN BULELENG

JUMLAH
NO URAIAN PEKER JAAN
( Rp )

I PEKERJAAN PIPA
A ### #NAME?
B ### #NAME?
C ### #NAME?
D ### #NAME?
E ### #NAME?
F ### #NAME?
G ### #NAME?
H PEKERJAAN PIPA DARI RESV. LOKAPAKSA SAMPAI JALAN NASIONAL ( - 390 M) -
I ### #NAME?
J ### #NAME?
K ### #NAME?
L ### #NAME?
M ### #NAME?

III PEKERJAAN BAK INTAKE


A PEKERJAAN PERSIAPAN DAN UMUM
B PEKERJAAN BANGUNAN SIPIL
- PEKERJAAN RESERVOAR STABILISASI DAN RUMAH POMPA #REF!
- PEKERJAAN BANGUNAN PENGELOLA 41,928,000.00
- PEKERJAAN BANGUNAN RUMAH GENSET Err:509
- PEKERJAAN BANGUNAN RUMAH JAGA 52,532,023.10
C PEKERJAAN PENATAAN HALAMAN/LANSCAPE 215,602,087.65
D PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
- PEKERJAAN MEKANIKAL DAN ELEKTRIKAL BANGUNAN BAK INTAKE DAN RUMAH POMPA 14,900,363,651.52
- PEKERJAAN MEKANIKAL DAN ELEKTRIKAL BANGUNAN GENSET 4,861,615,413.72
- PEKERJAAN MEKANIKAL DAN ELEKTRIKAL DILUAR BANGUNAN 3,980,143,835.31
- PEKERJAAN PERALATAN KANTOR, LAB DAN WORKSHOP 104,820,980.00

IV PEKERJAAN PEMBANGUNAN IPA ATAS (165 LT/DT)


A PEKERJAAN PERSIAPAN DAN UMUM 1,000,000.00
B PEKERJAAN BANGUNAN SIPIL
- PEKERJAAN BANGUNAN IPA KAPASITAS 165 LT/DT #REF!
- PEKERJAAN BANGUNAN PENGELOLA #REF!
- PEKERJAAN BANGUNAN KIMIA DAN CHLORINE 60,389,226.87
- PEKERJAAN SIPIL BANGUNAN GENSET Err:509
- PEKERJAAN BANGUNAN IPAL Err:509
- PEKERJAAN BANGUNAN RESERVOIR KAPASITAS 2600 M3 #REF!
- PEKERJAAN BANGUNAN POS JAGA 9,394,638.00
C BANGUNAN ADAT PURA 571,822,156.82
D PEKERJAAN HALAMAN/LANSCAPE 331,759,430.06
E PEKERJAAN PAGAR 449,825,659.09
F PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
- PEKERJAAN MEKANIKAL DAN ELEKTRIKAL BANGUNAN IPA KAPASITAS 165 L/DTK 10,904,873,315.32
- PEKERJAAN MEKANIKAL DAN ELEKTRIKAL BANGUNAN KIMIA DAN CHLORINE 4,294,133,669.20
- PEKERJAAN MEKANIKAL DAN ELEKTRIKAL BANGUNAN GENSET #REF!
- PEKERJAAN MEKANIKAL DAN ELEKTRIKAL BANGUNAN IPAL 25,104,485.82
- PEKERJAAN MEKANIKAL DAN ELEKTRIKAL RESERVOIR KAPASITAS 2600 M3 Err:509
- PEKERJAAN MEKANIKAL DAN ELEKTRIKAL LUAR BANGUNAN 7,910,406,559.05
- PEKERJAAN PERALATAN KANTOR, LAB DAN WORKSHOP 205,693,950.00
JUMLAH
NO URAIAN PEKER JAAN
( Rp )
V PEKERJAAN PEMBANGUNAN IPA BAWAH (185 LT/DT)
A PEKERJAAN PERSIAPAN DAN UMUM 1,000,000.00
B PEKERJAAN BANGUNAN SIPIL
- PEKERJAAN BANGUNAN IPA KAPASITAS 185 LT/DT #REF!
- PEKERJAAN BANGUNAN PENGELOLA Err:509
- PEKERJAAN BANGUNAN KIMIA DAN CHLORINE 60,389,226.87
- PEKERJAAN BANGUNAN GENSET Err:509
- PEKERJAAN BANGUNAN IPAL Err:509
- PEKERJAAN SIPIL RESERVOIR KAPASITAS 3600 M3 #REF!
- PEKERJAAN SIPIL BANGUNAN POS JAGA 16,468,338.00
C BANGUNAN ADAT PURA 571,822,156.82
D PEKERJAAN HALAMAN/LANSCAPE 395,826,377.47
E PEKERJAAN PAGAR Err:509
F PEKERJAAN JALAN AKSES Err:509
G PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
- PEKERJAAN MEKANIKAL DAN ELEKTRIKAL BANGUNAN IPA KAPSITAS 185 L/DTK 10,904,873,315.32
- PEKERJAAN MEKANIKAL DAN ELEKTRIKAL BANGUNAN KIMIA DAN CHLORINE 4,294,133,669.20
- PEKERJAAN MEKANIKAL DAN ELEKTRIKAL BANGUNAN GENSET 4,545,303,911.16
- PEKERJAAN MEKANIKAL DAN ELEKTRIKAL BANGUNAN IPAL 25,104,485.82
- PEKERJAAN MEKANIKAL DAN ELEKTRIKAL BANGUNAN RESERVOIR KAPASITAS 3600 M3 9,721,131,713.42
- PEKERJAAN MEKANIKAL DAN ELEKTRIKAL LUAR BANGUNAN 7,381,297,309.05
- PEKERJAAN PERALATAN KANTOR, LAB DAN WORKSHOP 205,693,950.00

JUMLAH #REF!
PPN 10 % #REF!
TOTAL #REF!
DIBULATKAN #REF!
RINCIAN ESTIMASI BIAYA KONSTRUKSI
SISTEM POMPA DAN GRAVITASI
PEKERJAAN : REVIEW DED SPAM TITAB KABUPATEN BULELENG

HARGA SATUAN JUMLAH


NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6

A PEKERJAAN PIPA TRANSMISI

A1 PEKERJAAN PERSIAPAN
1 Pengukuran dan Pematokan mtr 5,700.00 1,090.00 6,213,000.00
2 Test pit ttk 4.00 588,247.31 2,352,989.25
3 Penyediaan lokasi pembuangan hasil galian ls 1.00 5,000,000.00 5,000,000.00

4 Pembersihan semua fasilitas sementara, Pemindahan ls 1.00 6,000,000.00 6,000,000.00


mesin/peralatan, material sisa dan sebagainya
JUMLAH I
19,565,989.25
A2 PEKERJAAN OPEN TRENCH DGN CLEAN CONSTRUCTION (Eksisting Hot Mix)

1 Pipa dia ID 450 mm m' 700.00 798,766.98 559,136,882.50


2 Pipa dia ID 350 mm m' 5,000.00 720,127.84 3,600,639,209.16

JUMLAH II
4,159,776,091.66
A3 PEKERJAAN PERKERASAN /PENGASPALAN

1 Lapis Resap Pengikat - Aspal Cair liter 2,992.50 14,250.78 42,645,457.44


2 Lapis Perekat - Aspal Cair liter 1,396.50 14,002.12 19,553,961.65
3 Laston Lapis Aus (AC-WC) (gradasi halus/kasar) ton 230.31 625,907.58 144,151,565.34
4 Laston Lapis Antara (AC-BC) (gradasi halus/kasar) ton 350.43 608,577.07 213,261,846.64
5 Aspal Minyak ton 52.32 12,000,000.00 627,821,712.00
6 Bahan Pengisi (Filler) Tambahan liter 17.80 1,060.00 18,863.12
7 Pemotongan asapal m 5,000.00 50,000.00 250,000,000.00
JUMLAH III
1,297,453,406.20
A4 PEKERJAAN PENGADAAN PIPA DAN ACCESSORIES

1 Pipa Baja Three layer Polythylene dia.ID 450 mm m 700.00 2,016,115.37 1,411,280,759.00
2 Pipa Baja Three layer Polythylene dia.ID 350 mm m 5,000.00 1,202,384.46 6,011,922,300.00
3 Bend 90° Three Layer Polythelene dia 450 mm bh 4.00 7,029,753.37 28,119,013.48
4 Bend 45° Three Layer Polythelene dia 450 mm bh 4.00 5,522,996.93 22,091,987.71
5 Bend 22,5° Three Layer Polythelene dia 450 mm bh 5.00 4,520,269.33 22,601,346.64
6 Bend 11,25° Three Layer Polythelene dia 450 mm bh 5.00 3,315,930.19 16,579,650.95
7 Bend 90° Three Layer Polythelene dia 350 mm bh 4.00 4,711,931.06 18,847,724.24
8 Bend 45° Three Layer Polythelene dia 350 mm bh 17.00 3,709,425.63 63,060,235.63
9 Bend 22,5° Three Layer Polythelene dia 350 mm bh 28.00 3,007,516.31 84,210,456.54
10 Bend 11,25° Three Layer Polythelene dia 350 mm bh 34.00 2,185,368.54 74,302,530.33
11 AF Gate Valve PN 16 dia. 450 bh 3.00 68,738,628.00 206,215,884.00
12 AF Gate Valve PN 16 dia. 350 bh 5.00 23,166,750.00 115,833,750.00
13 Dismantling Joint dia. 450 bh 3.00 19,409,280.00 58,227,840.00
14 Dismantling Joint dia. 350 bh 5.00 6,092,900.00 30,464,500.00

JUMLAH IV
8,163,757,978.51
A5 PEKERJAAN PEMASANGAN PIPA DAN ACCESSORIES

1 Pipa Baja Three layer Polythylene dia.ID 450 mm m 700.00 204,662.94 143,264,057.26
2 Pipa Baja Three layer Polythylene dia.ID 350 mm m 5,000.00 143,264.06 716,320,286.29
3 Bend 90° Three Layer Polythelene dia 450 mm bh 4.00 1,238,383.85 4,953,535.40
4 Bend 45° Three Layer Polythelene dia 450 mm bh 4.00 1,238,383.85 4,953,535.40
5 Bend 22,5° Three Layer Polythelene dia 450 mm bh 5.00 1,238,383.85 6,191,919.25
6 Bend 11,25° Three Layer Polythelene dia 450 mm bh 5.00 1,238,383.85 6,191,919.25
7 Bend 90° Three Layer Polythelene dia 350 mm bh 4.00 898,544.32 3,594,177.28
8 Bend 45° Three Layer Polythelene dia 350 mm bh 17.00 898,544.32 15,275,253.44
9 Bend 22,5° Three Layer Polythelene dia 350 mm bh 28.00 898,544.32 25,159,240.96
10 Bend 11,25° Three Layer Polythelene dia 350 mm bh 34.00 898,544.32 30,550,506.88
11 AF Gate Valve PN 16 dia. 450 bh 3.00 1,238,383.85 3,715,151.55
12 AF Gate Valve PN 16 dia. 350 bh 5.00 898,544.32 4,492,721.60
13 Dismantling Joint dia. 450 bh 3.00 1,238,383.85 3,715,151.55
14 Dismantling Joint dia. 350 bh 5.00 898,544.32 4,492,721.60

JUMLAH V
972,870,177.71
A6 PEKERJAAN PENGETESAN PIPA DAN ACCESSORIES

1 Pipa Baja Three layer Polythylene dia.ID 450 mm m 700.00 8,987.38 6,291,166.67
2 Pipa Baja Three layer Polythylene dia.ID 350 mm m 5,000.00 6,157.17 30,785,833.33
JUMLAH VI
37,077,000.00
A7 PEKERJAAN FLUSHING PIPA DAN ACCESSORIES

1 Pipa Baja Three layer Polythylene dia.ID 450 mm m 700.00 12,673.98 8,871,787.50
2 Pipa Baja Three layer Polythylene dia.ID 350 mm m 5,000.00 8,897.89 44,489,425.00
JUMLAH VII
53,361,212.50

SUB TOTAL 14,703,861,855.83

B PEKERJAAN PIPA DISTRIBUSI UTAMA

I PEKERJAAN PERSIAPAN
1 Pengukuran dan Pematokan mtr 82,650.00 1,090.00 90,088,500.00
2 Test pit ttk 60.00 588,247.31 35,294,838.73
3 Penyediaan lokasi pembuangan hasil galian ls 1.00 15,000,000.00 15,000,000.00

4 Pembersihan semua fasilitas sementara, Pemindahan ls 1.00 92,500,000.00 92,500,000.00


mesin/peralatan, material sisa dan sebagainya
JUMLAH I
232,883,338.73
II PEKERJAAN OPEN TRENCH DGN CLEAN CONSTRUCTION (Eksisting Hot Mix)

1 Pipa dia ID 450 mm m' 11,100.00 798,766.98 8,866,313,422.52


2 Pipa dia ID 400 mm m' 20,850.00 798,766.98 16,654,291,428.79
3 Pipa dia ID 350 mm m' 10,400.00 720,127.84 7,489,329,555.05
4 Pipa dia ID 300 m' 9,600.00 617,359.91 5,926,655,127.35
5 Pipa dia ID 250 m' 30,700.00 617,359.91 18,952,949,209.33
JUMLAH II
57,889,538,743.04
III PEKERJAAN PERKERASAN /PENGASPALAN

1 Lapis Resap Pengikat - Aspal Cair liter 35,758.13 14,250.78 509,581,152.21


2 Lapis Perekat - Aspal Cair liter 16,687.13 14,002.12 233,655,139.44
3 Laston Lapis Aus (AC-WC) (gradasi halus/kasar) ton 2,752.01 625,907.58 1,722,502,821.22
4 Laston Lapis Antara (AC-BC) (gradasi halus/kasar) ton 4,187.34 608,577.07 2,548,318,720.08
5 Aspal Minyak ton 625.17 12,000,000.00 7,501,997,412.00
6 Bahan Pengisi (Filler) Tambahan liter 212.64 1,060.00 225,400.15
7 Pemotongan asapal m 47,677.50 50,000.00 2,383,875,000.00
JUMLAH III
14,900,155,645.11
IV PEKERJAAN PENGADAAN PIPA DAN ACCESSORIES

1 Pipa Baja Three layer Polythylene dia.ID 450 mm m 11,100.00 1,709,044.32 18,970,391,952.00
2 Pipa Baja Three layer Polythylene dia.ID 400 mm m 20,850.00 1,455,714.39 30,351,645,031.50
3 Pipa Baja Three layer Polythylene dia.ID 350 mm m 10,400.00 1,202,384.46 12,504,798,384.00
4 Pipa Baja Three layer Polythylene dia.ID 300 mm m 9,600.00 970,878.50 9,320,433,600.00
5 Pipa Baja Three layer Polythylene dia.ID 250 mm m 30,700.00 670,378.50 20,580,619,950.00
6 Bend 90° Three Layer Polythelene dia 450 mm bh 8.00 7,029,753.37 56,238,026.96
7 Bend 45° Three Layer Polythelene dia 450 mm bh 56.00 5,522,996.93 309,287,827.94
8 Bend 22,5° Three Layer Polythelene dia 450 mm bh 74.00 4,520,269.33 334,499,930.24
9 Bend 11,25° Three Layer Polythelene dia 450 mm bh 92.00 3,315,930.19 305,065,577.53
10 Bend 90° Three Layer Polythelene dia 400 mm bh 14.00 5,958,408.39 83,417,717.46
11 Bend 45° Three Layer Polythelene dia 400 mm bh 104.00 4,693,940.99 488,169,863.22
12 Bend 22,5° Three Layer Polythelene dia 400 mm bh 139.00 3,793,402.19 527,282,904.76
13 Bend 11,25° Three Layer Polythelene dia 400 mm bh 173.00 2,747,291.95 475,281,507.96
14 Bend 90° Three Layer Polythelene dia 350 mm bh 7.00 4,711,931.06 32,983,517.42
15 Bend 45° Three Layer Polythelene dia 350 mm bh 52.00 3,709,425.63 192,890,132.50
16 Bend 22,5° Three Layer Polythelene dia 350 mm bh 70.00 3,007,516.31 210,526,141.35
17 Bend 11,25° Three Layer Polythelene dia 350 mm bh 87.00 2,185,368.54 190,127,062.89
18 Bend 90° Three Layer Polythelene dia 300 mm bh 7.00 3,979,061.30 27,853,429.10
19 Bend 45° Three Layer Polythelene dia 300 mm bh 46.00 3,134,705.12 144,196,435.29
20 Bend 22,5° Three Layer Polythelene dia 300 mm bh 64.00 2,533,068.56 162,116,387.52
21 Bend 11,25° Three Layer Polythelene dia 300 mm bh 80.00 1,834,344.15 146,747,531.60
22 Bend 90° Three Layer Polythelene dia 250 mm bh 20.00 3,979,061.30 79,581,226.00
23 Bend 45° Three Layer Polythelene dia 250 mm bh 153.00 3,134,705.12 479,609,882.60
24 Bend 22,5° Three Layer Polythelene dia 250 mm bh 204.00 2,533,068.56 516,745,985.22
25 Bend 11,25° Three Layer Polythelene dia 250 mm bh 255.00 1,834,344.15 467,757,756.98
26 AF Tee dia 450 mm bh 12.00 Err:509 Err:509
27 AF Tee dia 400 mm bh 14.00 Err:509 Err:509
28 AF Tee dia 350 mm bh 18.00 Err:509 Err:509
29 AF Tee dia 300 mm bh 14.00 Err:509 Err:509
30 AF Tee dia 250 mm bh 15.00 Err:509 Err:509
31 AF Tee Reducer dia 450 x 400 mm bh 14.00 7,263,270.00 101,685,780.00
32 AF Tee Reducer dia 400 x 350 mm bh 17.00 Err:509 Err:509
33 AF Tee Reducer dia 350 x 300 mm bh 9.00 3,053,904.00 27,485,136.00
34 AF Tee Reducer dia 300 x 250 mm bh 9.00 Err:509 Err:509
35 AF Gate Valve PN 16 dia. 450 bh 8.00 Err:509 Err:509
36 AF Gate Valve PN 16 dia. 400 bh 13.00 Err:509 Err:509
37 AF Gate Valve PN 16 dia. 350 bh 7.00 Err:509 Err:509
38 AF Gate Valve PN 16 dia. 300 bh 6.00 17,692,405.00 106,154,430.00
39 AF Gate Valve PN 16 dia. 250 bh 20.00 Err:509 Err:509
40 Dismantling Joint dia. 450 bh 8.00 9,869,200.00 78,953,600.00
41 Dismantling Joint dia. 400 bh 13.00 8,087,200.00 105,133,600.00
42 Dismantling Joint dia. 350 bh 7.00 6,092,900.00 42,650,300.00
43 Dismantling Joint dia. 300 bh 6.00 5,236,000.00 31,416,000.00
44 Dismantling Joint dia. 250 bh 20.00 4,098,600.00 81,972,000.00
JUMLAH IV
Err:509

V PEKERJAAN PEMASANGAN PIPA DAN ACCESSORIES

1 Pipa Baja Three layer Polythylene dia.ID 450 mm m 11,100.00 204,662.94 2,271,758,622.25
2 Pipa Baja Three layer Polythylene dia.ID 400 mm m 20,850.00 171,967.73 3,585,527,096.55
3 Pipa Baja Three layer Polythylene dia.ID 350 mm m 10,400.00 143,264.06 1,489,946,195.49
4 Pipa Baja Three layer Polythylene dia.ID 300 mm m 9,600.00 119,610.10 1,148,256,978.24
5 Pipa Baja Three layer Polythylene dia.ID 250 mm bh 30,700.00 93,610.10 2,873,830,128.33
6 Bend 90° Three Layer Polythelene dia 450 mm bh 8.00 1,238,383.85 9,907,070.80
7 Bend 45° Three Layer Polythelene dia 450 mm bh 56.00 1,238,383.85 69,349,495.60
8 Bend 22,5° Three Layer Polythelene dia 450 mm bh 74.00 1,238,383.85 91,640,404.90
9 Bend 11,25° Three Layer Polythelene dia 450 mm bh 92.00 1,238,383.85 113,931,314.20
10 Bend 90° Three Layer Polythelene dia 400 mm bh 14.00 1,004,707.08 14,065,899.12
11 Bend 45° Three Layer Polythelene dia 400 mm bh 104.00 1,004,707.08 104,489,536.32
12 Bend 22,5° Three Layer Polythelene dia 400 mm bh 139.00 1,004,707.08 139,654,284.12
13 Bend 11,25° Three Layer Polythelene dia 400 mm bh 173.00 1,004,707.08 173,814,324.84
14 Bend 90° Three Layer Polythelene dia 350 mm bh 7.00 898,544.32 6,289,810.24
15 Bend 45° Three Layer Polythelene dia 350 mm bh 52.00 898,544.32 46,724,304.64
16 Bend 22,5° Three Layer Polythelene dia 350 mm bh 70.00 898,544.32 62,898,102.40
17 Bend 11,25° Three Layer Polythelene dia 350 mm bh 87.00 898,544.32 78,173,355.84
18 Bend 90° Three Layer Polythelene dia 300 mm bh 7.00 765,996.56 5,361,975.92
19 Bend 45° Three Layer Polythelene dia 300 mm bh 46.00 765,996.56 35,235,841.76
20 Bend 22,5° Three Layer Polythelene dia 300 mm bh 64.00 765,996.56 49,023,779.84
21 Bend 11,25° Three Layer Polythelene dia 300 mm bh 80.00 765,996.56 61,279,724.80
22 Bend 90° Three Layer Polythelene dia 250 mm bh 20.00 633,448.80 12,668,976.00
23 Bend 45° Three Layer Polythelene dia 250 mm bh 153.00 633,448.80 96,917,666.40
24 Bend 22,5° Three Layer Polythelene dia 250 mm bh 204.00 633,448.80 129,223,555.20
25 Bend 11,25° Three Layer Polythelene dia 250 mm bh 255.00 633,448.80 161,529,444.00
26 AF Tee dia 450 mm bh 12.00 1,238,383.85 14,860,606.20
27 AF Tee dia 400 mm bh 14.00 1,152,722.24 16,138,111.29
28 AF Tee dia 350 mm bh 18.00 1,100,250.00 19,804,500.00
29 AF Tee dia 300 mm bh 14.00 1,000,165.00 14,002,310.00
30 AF Tee dia 250 mm bh 15.00 900,200.00 13,503,000.00
31 AF Tee Reducer dia 450 x 400 mm bh 14.00 1,238,383.85 17,337,373.90
32 AF Tee Reducer dia 400 x 350 mm bh 17.00 1,152,722.24 19,596,278.00
33 AF Tee Reducer dia 350 x 300 mm bh 9.00 1,100,250.00 9,902,250.00
34 AF Tee Reducer dia 300 x 250 mm bh 9.00 1,000,165.00 9,001,485.00
35 AF Gate Valve PN 16 dia. 450 bh 8.00 1,238,383.85 9,907,070.80
36 AF Gate Valve PN 16 dia. 400 bh 13.00 1,238,383.85 16,098,990.05
37 AF Gate Valve PN 16 dia. 350 bh 7.00 1,152,722.24 8,069,055.65
38 AF Gate Valve PN 16 dia. 300 bh 6.00 1,100,250.00 6,601,500.00
39 AF Gate Valve PN 16 dia. 250 bh 20.00 1,000,165.00 20,003,300.00
40 Dismantling Joint dia. 450 bh 8.00 1,238,383.85 9,907,070.80
41 Dismantling Joint dia. 400 bh 13.00 1,004,707.08 13,061,192.04
42 Dismantling Joint dia. 350 bh 7.00 898,544.32 6,289,810.24
43 Dismantling Joint dia. 300 bh 6.00 765,996.56 4,595,979.36
44 Dismantling Joint dia. 250 bh 20.00 765,996.56 15,319,931.20
JUMLAH V
13,075,497,702.32
VI PEKERJAAN PENGETESAN PIPA DAN ACCESSORIES

1 Pipa Baja Three layer Polythylene dia.ID 450 mm m 11,100.00 8,987.38 99,759,928.57
2 Pipa Baja Three layer Polythylene dia.ID 400 mm m 20,850.00 7,033.90 146,656,914.29
3 Pipa Baja Three layer Polythylene dia.ID 350 mm m 10,400.00 6,157.17 64,034,533.33
3 Pipa Baja Three layer Polythylene dia.ID 300 mm m 9,600.00 5,680.43 54,532,114.29
4 Pipa Baja Three layer Polythylene dia.ID 250 mm m 30,700.00 4,280.43 131,409,157.14
JUMLAH VI
496,392,647.62
VII PEKERJAAN FLUSHING PIPA DAN ACCESSORIES

1 Pipa Baja Three layer Polythylene dia.ID 450 mm m 11,100.00 12,673.98 140,681,201.79
2 Pipa Baja Three layer Polythylene dia.ID 400 mm m 20,850.00 8,376.47 174,649,429.29
3 Pipa Baja Three layer Polythylene dia.ID 350 mm m 10,400.00 8,897.89 92,538,004.00
4 Pipa Baja Three layer Polythylene dia.ID 300 mm m 9,600.00 6,478.57 62,194,285.71
5 Pipa Baja Three layer Polythylene dia.ID 250 mm m 30,700.00 5,578.57 171,262,142.86
JUMLAH VII
641,325,063.64

SUB TOTAL Err:509

C PEKERJAAN PIPA DISTRIBUSI, DAN BANGUNAN PELENGKAP

I PEKERJAAN PERSIAPAN

1 Pengukuran dan Pematokan mtr 206,900.00 1,090.00 225,521,000.00

2 Test pit ttk 60.00 588,247.31 35,294,838.73

3 Penyediaan lokasi pembuangan hasil galian ls 1.00 15,000.00 15,000.00

4 ls 1.00 25,000,000.00 25,000,000.00


Pembersihan semua fasilitas sementara, Pemindahan
mesin/peralatan, material sisa dan sebagainya
JUMLAH I
285,830,838.73
II PEKERJAAN TANAH
Pek. Galian Tanah Biasa m3 35,750.00 2,130,242,400.00
1 59,587.20
Pek. Galian Tanah Berbatu/Cadas m3 72,300.00 6,462,231,840.00
2 89,380.80
Pek. Urugan Pilihan dipadatkan m3 124,026.50 3,348,715,500.00
3 27,000.00
Pek. Urugan kembali dipadatkan m3 19,989.00 404,777,250.00
4 20,250.00
Pek. Pemotongan Aspal m1 14,680.00 1,518,646,000.00
5 103,450.00
Pek. Urugan Pasir Dipadatkan m3 167,926.50 3,400,511,625.00
6 20,250.00
Pek. Urugan Agregat Klas A Dipadatkan m3 355,250.34 7,193,819,419.34
7 20,250.00
Pek. Urugan Agregat Klas B Dipadatkan m3 325,250.34 6,586,319,419.34
8 20,250.00
Sub Jumlah II Rp 31,045,263,453.69

III PEKERJAAN PENGADAAN PIPA DAN ACCESSORIES

Pengadaan Pipa

Pipa HDPE PE 250 mm, PN 10 Bar mtr 2,600.00 539,770.00 1,403,402,000.00


1
Pipa HDPE PE 200 mm, PN 10 Bar mtr 31,400.00 347,160.00 10,900,824,000.00
2
Pipa HDPE PE 160 mm, PN 10 Bar mtr 111,800.00 222,420.00 24,866,556,000.00
3
Pipa HDPE PE 110 mm, PN 10 Bar mtr 61,100.00 106,590.00 6,512,649,000.00
4

Pengadaan Accessories

Bend 90° HDPE OD 250 mm, PN 10 Bar bh 4.00 1,566,434.22 6,265,736.87


1
Bend 45° HDPE OD 250 mm, PN 10 Bar bh 34.00 1,141,000.00 38,794,000.00
2
Bend 90° HDPE OD 200 mm, PN 10 Bar bh 21.00 891,008.78 18,711,184.45
3
Bend 45° HDPE OD 200 mm, PN 10 Bar bh 209.00 585,600.00 122,390,400.00
4
Bend 90° HDPE OD 160 mm, PN 10 Bar bh 78.00 551,600.00 43,024,800.00
5
Bend 45° HDPE OD 160 mm, PN 10 Bar bh 575.00 348,400.00 200,330,000.00
6
Bend 90° HDPE OD 110 mm, PN 10 Bar bh 44.00 248,800.00 10,947,200.00
7
Bend 45° HDPE OD 110 mm, PN 10 Bar bh 324.00 175,700.00 56,926,800.00
8
Tee Equal DN 250 mm, PN 10 Bar bh 4.00 971,500.00 3,886,000.00
9
Tee Equal DN 200 mm, PN 10 Bar bh 21.00 675,100.00 14,177,100.00
10
Tee Equal DN 160 mm, PN 10 Bar bh 54.00 529,400.00 28,587,600.00
11
Tee Equal DN 110 mm, PN 10 Bar bh 44.00 344,100.00 15,140,400.00
12
Tee Reducer HDPE PE 250x100mm, PN 10 Bar bh 12.00 971,500.00 11,658,000.00
13
Tee Reducer HDPE PE 200x110 mm, PN 10 Bar bh 14.00 675,000.00 9,450,000.00
14
Tee Reducer HDPE PE 160x110 mm, PN 10 Bar bh 98.00 529,400.00 51,881,200.00
15
Tee Reducer HDPE PE 160x100 mm, PN 10 Bar bh 45.00 529,400.00 23,823,000.00
16
Tee Reducer HDPE PE 110x110 mm, PN 10 Bar bh 32.00 344,100.00 11,011,200.00
17
Reducer HDPE PE 250x200 mm, PN 10 Bar bh 6.00 699,000.00 4,194,000.00
18
Reducer HDPE PE 250x160 mm, PN 10 Bar bh 12.00 685,134.00 8,221,608.00
19
Reducer HDPE PE 160x110 mm, PN 10 Bar bh 14.00 472,500.00 6,615,000.00
20
Stub End HDPE PE 250 mm, bh 40.00 833,900.00 33,356,000.00
21
Stub End HDPE PE 200 mm, bh 112.00 552,440.00 61,873,280.00
22
Stub End HDPE PE 160 mm, bh 184.00 324,375.00 59,685,000.00
23
Stub End HDPE PE 110 mm, bh 176.00 68,750.00 12,100,000.00
24
Backing Ring Steeel OD 250 mm bh 40.00 824,850.00 32,994,000.00
25
Backing Ring Steeel OD 200 mm bh 112.00 444,150.00 49,744,800.00
26
Backing Ring Steeel OD 160 mm bh 184.00 317,250.00 58,374,000.00
27
Backing Ring Steeel OD 110 mm bh 14.00 177,660.00 2,487,240.00
28
Gate Valve PN 16 DN 250 mm bh 20.00 12,495,000.00 249,900,000.00
29
Gate Valve PN 16 DN 200 mm bh 56.00 8,160,000.00 456,960,000.00
30
Gate Valve PN 16 DN 160 mm bh 92.00 5,995,000.00 551,540,000.00
31
Gate Valve PN 16 DN 110 mm bh 88.00 3,146,000.00 276,848,000.00
32
Check Valve DN 160 mm untuk pompa bh 10.00 28,327,000.00 283,270,000.00
33
Check Valve DN 110 mm bh 6.00 2,250,000.00 13,500,000.00
34
Air Valve + Gate Valve 2'' bh 18.00 177,660.00 3,197,880.00
35
Air Valve + Gate Valve 1/2'' bh 14.00 1,764,799.15 24,707,188.10
36
Clamp Sadle 160 mm x 3/4'' bh 2.00 39,500.00 79,000.00
37
Clamp Sadle 160 mm x 2'' bh 5.00 96,600.00 483,000.00
38

Sub Jumlah III Rp 46,540,565,617.42

IV PEKERJAAN PEMASANGAN PIPA , ACCESSORIES DAN PENGETESAN

Pemasangan Pipa

Pipa HDPE PE 250 mm, PN 10 Bar mtr 2,600.00 96,025.22 249,665,584.36


1
Pipa HDPE PE 200 mm, PN 10 Bar mtr 31,400.00 73,473.34 2,307,062,915.28
2
Pipa HDPE PE 160 mm, PN 10 Bar mtr 111,800.00 58,081.05 6,493,461,026.71
3
Pipa HDPE PE 110 mm, PN 10 Bar mtr 61,100.00 8,496.77 519,152,682.48
4
Pengetesan Pipa

Pipa HDPE PE 250 mm, PN 10 Bar mtr 2,600.00 3,267.37 8,495,151.79


1
Pipa HDPE PE 200 mm, PN 10 Bar mtr 31,400.00 3,002.43 94,276,257.14
2
Pipa HDPE PE 160 mm, PN 10 Bar mtr 111,800.00 2,832.87 316,714,706.29
3
Pipa HDPE PE 110 mm, PN 10 Bar mtr 61,100.00 2,673.91 163,375,660.96
4
Flushing Pipa

Pipa HDPE PE 250 mm, PN 10 Bar mtr 2,600.00 3,759.97 9,775,922.62


1
Pipa HDPE PE 200 mm, PN 10 Bar mtr 31,400.00 3,150.10 98,912,990.48
2
Pipa HDPE PE 160 mm, PN 10 Bar mtr 111,800.00 2,770.98 309,795,031.62
3
Pipa HDPE PE 110 mm, PN 10 Bar mtr 61,100.00 2,213.05 135,217,369.55
4
Pemasangan Accessories

Bend 90° HDPE OD 250 mm, PN 10 Bar bh 4.00 1,121,956.20 4,487,824.82


1
Bend 45° HDPE OD 250 mm, PN 10 Bar bh 34.00 1,121,956.20 38,146,510.94
2
Bend 90° HDPE OD 200 mm, PN 10 Bar bh 21.00 851,333.60 17,878,005.65
3
Bend 45° HDPE OD 200 mm, PN 10 Bar bh 209.00 851,333.60 177,928,722.86
4
Bend 90° HDPE OD 160 mm, PN 10 Bar bh 78.00 666,626.07 51,996,833.32
5
Bend 45° HDPE OD 160 mm, PN 10 Bar bh 575.00 666,626.07 383,309,989.20
6
Bend 90° HDPE OD 110 mm, PN 10 Bar bh 44.00 391,454.91 17,224,016.16
7
Bend 45° HDPE OD 110 mm, PN 10 Bar bh 324.00 391,454.91 126,831,391.74
8
Tee Equal DN 250 mm, PN 10 Bar bh 4.00 1,682,934.31 6,731,737.23
9
Tee Equal DN 200 mm, PN 10 Bar bh 21.00 1,277,000.40 26,817,008.47
10
Tee Equal DN 160 mm, PN 10 Bar bh 54.00 999,939.10 53,996,711.52
11
Tee Equal DN 110 mm, PN 10 Bar bh 44.00 587,182.37 25,836,024.24
12
Tee Reducer HDPE PE 250x75 mm, PN 10 Bar bh 12.00 1,282,600.44 15,391,205.25
13
Tee Reducer HDPE PE 200x110 mm, PN 10 Bar bh 14.00 1,047,061.06 14,658,854.82
14
Tee Reducer HDPE PE 160x110 mm, PN 10 Bar bh 98.00 862,353.52 84,510,645.41
15
Tee Reducer HDPE PE 160x75 mm, PN 10 Bar bh 45.00 827,270.30 37,227,163.56
16
Tee Reducer HDPE PE 110x75 mm, PN 10 Bar bh 32.00 552,099.15 17,667,172.67
17
Reducer HDPE PE 250x200 mm, PN 10 Bar bh 6.00 986,644.90 5,919,869.42
18
Reducer HDPE PE 250x160 mm, PN 10 Bar bh 12.00 894,291.14 10,731,493.63
19
Reducer HDPE PE 160x110 mm, PN 10 Bar bh 14.00 666,626.07 9,332,764.95
20
Stub End HDPE PE 250 mm, bh 40.00 560,978.10 22,439,124.08
21
Stub End HDPE PE 200 mm, bh 112.00 425,666.80 47,674,681.72
22
Stub End HDPE PE 160 mm, bh 184.00 333,313.03 61,329,598.27
23
Stub End HDPE PE 110 mm, bh 176.00 195,727.46 34,448,032.33
24
Backing Ring Steeel OD 250 mm bh 40.00 57,856.25 2,314,250.00
25
Backing Ring Steeel OD 200 mm bh 112.00 49,856.25 5,583,900.00
26
Backing Ring Steeel OD 160 mm bh 184.00 41,856.25 7,701,550.00
27
Backing Ring Steeel OD 110 mm bh 14.00 35,656.25 499,187.50
28
Gate Valve PN 16 DN 250 mm bh 20.00 116,880.00 2,337,600.00
29
Gate Valve PN 16 DN 200 mm bh 56.00 108,880.00 6,097,280.00
30
Gate Valve PN 16 DN 160 mm bh 92.00 100,880.00 9,280,960.00
31
Gate Valve PN 16 DN 110 mm bh 88.00 51,740.00 4,553,120.00
32
Check Valve DN 160 mm untuk pompa bh 10.00 108,880.00 1,088,800.00
33
Check Valve DN 110 mm bh 6.00 100,880.00 605,280.00
34
Air Valve + Gate Valve 2'' bh 18.00 705,919.66 12,706,553.88
35
Air Valve + Gate Valve 1/2'' bh 14.00 352,959.83 4,941,437.62
36
Clamp Sadle 160 mm x 3/4'' bh 2.00 35,348.00 70,696.00
37
Clamp Sadle 160 mm x 2'' bh 5.00 35,396.00 176,980.00
38

Sub Jumlah IV Rp 12,056,378,276.52

V PEKERJAAN BANGUNAN SIPIL


Box Gate Valve unit 129.80 1,384,918.89 179,756,101.46

Uraian pekerjaan per 1 unit bangunan :


1
Galian Tanah Biasa m3 0.200 7,150.00
2 35,750.00
Urugan Pasir m3 0.013 2,099.08
3 167,926.50
Pekerjaan Acian 1 : 2 m2 1.800 53,488.44
4 29,715.80
Beton Camp. 1smn : 3 psr : 5 krl m3 0.015 11,876.34
5 791,756.00
Beton Camp. 1smn : 11/2 psr : 2 1/2 krl m3 0.410 308,456.53
6 752,333.00
Baja Tulangan kg 61.500 682,742.25
7 11,101.50
Begisting m2 2.250 319,106.25
8 141,825.00
Sub Jumlah V Rp 1,384,918.89

VI Jembatan Pipa, Panjang = 24 m' Unit 15.00 175,133,795.43 2,627,006,931.39

Uraian pekerjaan per 1 unit bangunan :


1
Galian Tanah berbatu m3 96.21 6,955,886.75
2 72,300.00
Galian tanah biasa m3 96.21 3,439,459.91
3 35,750.00
Urugan tanah dipadatkan m3 96.21 1,923,115.08
4 19,989.00
Pasangan Batu Kali Camp. 1smn : 4 psr m3 15.00 8,702,835.00
5 580,189.00
Beton Cyclop m3 14.76 8,163,532.33
6 553,159.80
Beton Camp. 1smn : 11/2 psr : 2 1/2 krl m3 36.61 27,543,106.38
7 752,333.00
Baja Frofil kg 4,508.18 47,335,932.00
8 10,500.00
Pelat buhul / pengaku kg 557.06 5,849,141.76
9 10,500.00
Baja Tulangan kg 3,382.79 37,554,085.59
10 11,101.50
Begisting m2 155.80 22,096,249.91
11 141,825.00
Baut 3/4" bh 140.00 840,000.00
12 6,000.00
Pelat Klem pipa bh 25.00 422,725.00
13 16,909.00
Kayu kamper 6/12 cm m3 0.35 2,587,200.00
14 7,350,000.00
Cat Jembatan + Pipa m2 8.60 200,000.00 1,720,525.71
15
Sub Jumlah VI Rp 175,133,795.43

VII PEKERJAAN LAIN LAIN

Pasangan Batu Kali Camp. 1smn : 4 psr m³ 1,800.00 1,044,340,200.00


1 580,189.00
Beton Camp. 1smn : 3 psr : 5 krl m³ 500.00 395,878,000.00
2 791,756.00
Beton Camp. 1smn : 11/2 psr : 2 1/2 krl /Trush Block m³ 450.00 338,549,850.00
3 752,333.00
Pembuatan dan Pemasangan Pelindung Air valve Bh 243.00 36,450,000.00
4 150,000.00
Pembuatan dan Pemasangan Beton KS Bh 15.00 1,875,000.00
5 125,000.00
Pembuatan dan Pemasangan patok Ujung pipa Bh 1.00 100,000.00
6 100,000.00
Aspalt AC - WC t=4 cm m2 135,008.03 14,614,618,834.69
7 108,250.00
Aspalt AC - BC t=5 cm m2 168,760.03 18,268,273,543.36
8 108,250.00
Pembersihan Akhir Ls 1.00 20,000,000.00 20,000,000.00
9
Sub Jumlah VII Rp 34,720,085,428.04

SUB TOTAL 127,454,886,647.24

D PEKERJAAN PIPA PELAYANAN, DAN BANGUNAN PELENGKAP

I PEKERJAAN PERSIAPAN
1 Pengukuran dan Pematokan mtr 135,000.00 1,090.00 147,150,000.00
2 Test pit ttk 25.00 588,247.31 14,706,182.80
3 Penyediaan lokasi pembuangan hasil galian ls 1.00 15,000.00 15,000.00

4 Pembersihan semua fasilitas sementara, Pemindahan ls 1.00 25,000,000.00 25,000,000.00


mesin/peralatan, material sisa dan sebagainya
JUMLAH I
186,871,182.80
II PEKERJAAN TANAH

1 Pek. Galian Tanah Biasa m3 38,880.00 35,750.00 1,389,960,000.00


2 Pek. Galian Tanah Berbatu/Cadas m3 58,320.00 72,300.00 4,216,536,000.00
3 Pek. Urugan Pilihan dipadatkan m3 27,000.00 124,026.50 3,348,715,500.00
4 Pek. Urugan kembali dipadatkan m3 20,250.00 19,989.00 404,777,250.00
5 Pek. Pemotongan Aspal m1 67,500.00 14,680.00 990,900,000.00
6 Pek. Urugan Pasir Dipadatkan m3 20,250.00 167,926.50 3,400,511,625.00
7 Pek. Urugan Agregat Klas A Dipadatkan m3 20,250.00 355,250.34 7,193,819,419.34
8 Pek. Urugan Agregat Klas B Dipadatkan m3 20,250.00 325,250.34 6,586,319,419.34

Sub Jumlah II Rp 27,531,539,213.69

III PEKERJAAN PENGADAAN PIPA DAN ACCESSORIES

Pengadaan Pipa

1 Pipa HDPE PE 160 mm, PN 10 Bar mtr 81,900.00 222,420.00 18,216,198,000.00


2 Pipa HDPE PE 110 mm, PN 10 Bar mtr 53,100.00 106,590.00 5,659,929,000.00

Pengadaan Accessories
1 Bend 90° HDPE OD 160 mm, PN 10 Bar bh 54.00 551,600.00 29,786,400.00
2 Bend 45° HDPE OD 160 mm, PN 10 Bar bh 409.00 348,400.00 142,495,600.00
3 Bend 90° HDPE OD 110 mm, PN 10 Bar bh 36.00 248,800.00 8,956,800.00
4 Bend 45° HDPE OD 110 mm, PN 10 Bar bh 265.00 175,700.00 46,560,500.00
5 Tee Equal DN 160 mm, PN 10 Bar bh 30.00 529,400.00 15,882,000.00
6 Tee Equal DN 110 mm, PN 10 Bar bh 21.00 344,100.00 7,226,100.00
7 Tee Reducer HDPE PE 160x110 mm, PN 10 Bar bh 60.00 529,400.00 31,764,000.00
8 Tee Reducer HDPE PE 160x100 mm, PN 10 Bar bh 30.00 529,400.00 15,882,000.00
9 Tee Reducer HDPE PE 110x110 mm, PN 10 Bar bh 25.00 344,100.00 8,602,500.00
10 Reducer HDPE PE 160x110 mm, PN 10 Bar bh 12.00 472,500.00 5,670,000.00
11 Stub End HDPE PE 160 mm, bh 126.00 324,375.00 40,871,250.00
12 Stub End HDPE PE 110 mm, bh 108.00 68,750.00 7,425,000.00
13 Backing Ring Steeel OD 160 mm bh 126.00 317,250.00 39,973,500.00
14 Backing Ring Steeel OD 110 mm bh 108.00 177,660.00 19,187,280.00
15 Gate Valve PN 16 DN 160 mm bh 63.00 5,995,000.00 377,685,000.00
16 Gate Valve PN 16 DN 110 mm bh 54.00 3,146,000.00 169,884,000.00
17 Check Valve DN 160 mm untuk pompa bh 10.00 28,327,000.00 283,270,000.00
18 Check Valve DN 110 mm bh 7.00 2,250,000.00 15,750,000.00
19 Air Valve + Gate Valve 2'' bh 20.00 177,660.00 3,553,200.00
20 Air Valve + Gate Valve 1/2'' bh 15.00 1,764,799.15 26,471,987.25
21 Clamp Sadle 160 mm x 3/4'' bh 20.00 39,500.00 790,000.00
22 Clamp Sadle 160 mm x 2'' bh 15.00 96,600.00 1,449,000.00

Sub Jumlah III Rp 25,175,263,117.25


IV PEKERJAAN PEMASANGAN PIPA , ACCESSORIES DAN PENGETESAN

Pemasangan Pipa
1 Pipa HDPE PE 160 mm, PN 10 Bar mtr 81,900.00 58,081.05 4,756,837,728.87
2 Pipa HDPE PE 110 mm, PN 10 Bar mtr 53,100.00 8,496.77 451,178,517.83
Pengetesan Pipa
1 Pipa HDPE PE 160 mm, PN 10 Bar mtr 81,900.00 2,832.87 232,011,936.00
2 Pipa HDPE PE 110 mm, PN 10 Bar mtr 53,100.00 2,673.91 141,984,412.39
Flushing Pipa
1 Pipa HDPE PE 160 mm, PN 10 Bar mtr 81,900.00 2,770.98 226,942,872.00
2 Pipa HDPE PE 110 mm, PN 10 Bar mtr 53,100.00 2,213.05 117,512,967.64
Pemasangan Accessories
1 Bend 90° HDPE OD 160 mm, PN 10 Bar bh 54.00 666,626.07 35,997,807.68
2 Bend 45° HDPE OD 160 mm, PN 10 Bar bh 409.00 666,626.07 272,650,061.88
3 Bend 90° HDPE OD 110 mm, PN 10 Bar bh 36.00 391,454.91 14,092,376.86
4 Bend 45° HDPE OD 110 mm, PN 10 Bar bh 265.00 391,454.91 103,735,551.89
5 Tee Equal DN 160 mm, PN 10 Bar bh 30.00 999,939.10 29,998,173.07
6 Tee Equal DN 110 mm, PN 10 Bar bh 21.00 587,182.37 12,330,829.75
7 Tee Reducer HDPE PE 160x110 mm, PN 10 Bar bh 60.00 862,353.52 51,741,211.47
8 Tee Reducer HDPE PE 160x75 mm, PN 10 Bar bh 30.00 827,270.30 24,818,109.04
9 Tee Reducer HDPE PE 110x75 mm, PN 10 Bar bh 25.00 552,099.15 13,802,478.65
10 Reducer HDPE PE 160x110 mm, PN 10 Bar bh 12.00 666,626.07 7,999,512.82
11 Stub End HDPE PE 160 mm, bh 126.00 333,313.03 41,997,442.29
12 Stub End HDPE PE 110 mm, bh 108.00 195,727.46 21,138,565.29
13 Backing Ring Steeel OD 160 mm bh 126.00 41,856.25 5,273,887.50
14 Backing Ring Steeel OD 110 mm bh 108.00 35,656.25 3,850,875.00
15 Gate Valve PN 16 DN 160 mm bh 63.00 100,880.00 6,355,440.00
16 Gate Valve PN 16 DN 110 mm bh 54.00 51,740.00 2,793,960.00
17 Check Valve DN 160 mm untuk pompa bh 10.00 108,880.00 1,088,800.00
18 Check Valve DN 110 mm bh 7.00 100,880.00 706,160.00
19 Air Valve + Gate Valve 2'' bh 20.00 705,919.66 14,118,393.20
20 Air Valve + Gate Valve 1/2'' bh 15.00 352,959.83 5,294,397.45
21 Clamp Sadle 160 mm x 3/4'' bh 20.00 35,348.00 706,960.00
22 Clamp Sadle 160 mm x 2'' bh 15.00 35,396.00 530,940.00

Sub Jumlah IV Rp 6,597,490,368.58


V PEKERJAAN BANGUNAN SIPIL
Box Gate Valve unit 117.00 1,384,918.89 162,035,510.28
1 Uraian pekerjaan per 1 unit bangunan :
2 Galian Tanah Biasa m3 0.200 35,750.00 7,150.00
3 Urugan Pasir m3 0.013 167,926.50 2,099.08
4 Pekerjaan Acian 1 : 2 m2 1.800 29,715.80 53,488.44
5 Beton Camp. 1smn : 3 psr : 5 krl m3 0.015 791,756.00 11,876.34
6 Beton Camp. 1smn : 11/2 psr : 2 1/2 krl m3 0.410 752,333.00 308,456.53
7 Baja Tulangan kg 61.500 11,101.50 682,742.25
8 Begisting m2 2.250 141,825.00 319,106.25
Sub Jumlah V Rp 1,384,918.89

VI Jembatan Pipa, Panjang = 24 m' Unit 12.00 175,133,795.43 2,101,605,545.12


1 Uraian pekerjaan per 1 unit bangunan :
2 Galian Tanah berbatu m3 96.21 72,300.00 6,955,886.75
3 Galian tanah biasa m3 96.21 35,750.00 3,439,459.91
4 Urugan tanah dipadatkan m3 96.21 19,989.00 1,923,115.08
5 Pasangan Batu Kali Camp. 1smn : 4 psr m3 15.00 580,189.00 8,702,835.00
6 Beton Cyclop m3 14.76 553,159.80 8,163,532.33
7 Beton Camp. 1smn : 11/2 psr : 2 1/2 krl m3 36.61 752,333.00 27,543,106.38
8 Baja Frofil kg 4,508.18 10,500.00 47,335,932.00
9 Pelat buhul / pengaku kg 557.06 10,500.00 5,849,141.76
10 Baja Tulangan kg 3,382.79 11,101.50 37,554,085.59
11 Begisting m2 155.80 141,825.00 22,096,249.91
12 Baut 3/4" bh 140.00 6,000.00 840,000.00
13 Pelat Klem pipa bh 25.00 16,909.00 422,725.00
14 Kayu kamper 6/12 cm m3 0.35 7,350,000.00 2,587,200.00
15 Cat Jembatan + Pipa m2 8.60 200,000.00 1,720,525.71

Sub Jumlah VI Rp 175,133,795.43

VII PEKERJAAN LAIN LAIN


1 Pasangan Batu Kali Camp. 1smn : 4 psr m³ 1,500.00 580,189.00 870,283,500.00
2 Beton Camp. 1smn : 3 psr : 5 krl m³ 500.00 791,756.00 395,878,000.00
3 Beton Camp. 1smn : 11/2 psr : 2 1/2 krl /Trush Block m³ 450.00 752,333.00 338,549,850.00
4 Pembuatan dan Pemasangan Pelindung Air valve Bh 243.00 150,000.00 36,450,000.00
5 Pembuatan dan Pemasangan Beton KS Bh 15.00 125,000.00 1,875,000.00
6 Pembuatan dan Pemasangan patok Ujung pipa Bh 1.00 100,000.00 100,000.00
7 Aspalt AC - WC t=4 cm m2 67,500.00 135,008.03 9,113,041,767.59
8 Aspalt AC - BC t=5 cm m2 67,500.00 168,760.03 11,391,302,209.48
9 Pembersihan Akhir Ls 1.00 20,000,000.00 20,000,000.00

Sub Jumlah VII Rp 22,167,480,327.07

SUB TOTAL 83,922,285,264.78


E BANGUNAN PENUNJANG (JEMBATAN PIPA)

PEMBANGUNAN JEMBATAN PIPA

918,386,667.65
PEMBANGUNAN JEMBATAN PIPA L = 60 m

HARGA PER M' 15,306,444.46

Pekerjaan Tanah :
Galian Tanah berbatu m³ 96.21 140,142.27 13,482,900.76
Galian tanah biasa m³ 24.50 52,875.00 1,295,437.50
Urugan tanah dipadatkan m³ 100.00 154,006.36 15,400,636.36

Pekerjaan Pasangan :
Pasangan Batu Kali 1:4 m³ 325.00 802,395.69 260,778,598.89

Pekerjaan Beton :
Beton Cyclop m³ 24.52 725,785.39 17,793,882.53
Beton Cor K225 m³ 61.30 831,988.38 51,000,620.43

Baja Frofil :
Baja Frofil kg 18,684.44 13,907.00 259,844,533.52
Pelat baja dan pengaku kg 5,405.35 13,907.00 75,172,244.17

Pembesian :
Baja Tulangan kg 5,486.53 11,770.75 64,580,546.28

Begisting :
Begisting m² 328.49 204,027.25 67,021,778.47

Lain Lain :
Baut 3/4" bh 6,172.00 6,000.00 37,032,000.00
Baut 1" bh 1,512.00 9,500.00 14,364,000.00
Angker 1" bh 18.00 25,000.00 450,000.00
Elastoner bh 2.00 2,200,000.00 4,400,000.00
Pelat Klem pipa bh 48.00 35,000.00 1,680,000.00
Kayu kamper 6/12 m³ 0.40 6,850,000.00 2,769,811.20
Cat Jembatan + Pipa m² 764.64 40,960.00 31,319,677.54
Jumlah 918,386,667.65

PEKERJAAN BANGUNAN JEMBATAN M 650 15,306,444.46 9,949,188,899.58

F PEKERJAAN PEMBANGUNAN RESERVOAR


RESERVOAR DISTRIBUSI DARI IPA TITAB BAWAH
RD KOLAPAKSA M3 600.00 2,046,039.84 1,227,623,902.88
RD PANGKUNG PARUK 1 M3 100.00 2,046,039.84 204,603,983.81
RD PANGKUNG PARUK 2 M3 450.00 2,046,039.84 920,717,927.16
RD CELUKAN BAWANG M3 700.00 2,046,039.84 1,432,227,886.69
RD GEROKGAK 1 M3 900.00 2,046,039.84 1,841,435,854.31
RD GEROKGAK 2 M3 160.00 2,046,039.84 327,366,374.10
RD PEMUTERAN M3 500.00 2,046,039.84 1,023,019,919.06
RD PEJARAKAN 1 M3 800.00 2,046,039.84 1,636,831,870.50
RD PEJARAKAN 2 M3 160.00 2,046,039.84 327,366,374.10
RD GIMANUK M3 800.00 2,046,039.84 1,636,831,870.50

RESERVOAR DISTRIBUSI DARI IPA TITAB ATAS


RD SUBUK M3 900.00 2,046,039.84 1,841,435,854.31
RD KEKERAN M3 300.00 2,046,039.84 613,811,951.44
RD TEGAL M3 800.00 2,046,039.84 1,636,831,870.50
RD T WISIA M3 1,500.00 2,046,039.84 3,069,059,757.19
PEKERJAAN BANGUNAN RESERVOAR 17,739,165,396.55
G1 KONSTRUKSI BANGUNAN PRASIDEMENTASI DAN BANGUNAN PENUNJANG
(PEKERJAAN SIPIL)

HARGA SATUAN JUMLAH


NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6

1 PEKERJAAN BANGUNAN PRASEDIMENTASI LT/DT 350 10,008,231.41 3,502,880,992.53


2 PEKERJAAN RUMAH POMPA BH 1 566,132,652.74 566,132,652.74
3 PEKERJAAN RUMAH GENSET BH 1 622,629,100.88 622,629,100.88
4 PEKERJAAN POS JAGA BH 1 119,574,123.97 119,574,123.97
5 BANGUNAN ADAT PURA SET 1 1,635,938,096.14 1,635,938,096.14
6 PEKERJAAN LANDSCAPE m2 200 1,588,171.57 317,634,314.52
7 PEKERJAAN PAGAR m2 100 11,823,669.86 1,182,366,986.04

SUB TOTAL 7,947,156,266.82

G2 KONSTRUKSI BANGUNAN PRASIDEMENTASI DAN BANGUNAN PENUNJANG


(PEKERJAAN M&E)

HARGA SATUAN JUMLAH


NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6

PENGADAAN DAN PEMASANGAN POMPA Q=200 ltr/dt


1 SET 2 999,273,240.00 1,998,546,480.00
H=100 m DAN AKSESORIS

PENGADAAN DAN PEMASANGAN POMPA Q=150 ltr/dt


2 SET 2 999,273,240.00 1,998,546,480.00
H=175 m DAN AKSESORIS

PENGADAAN DAN PEMASANGAN GENSET DAN


3 SET 1 1,449,363,813.33 1,449,363,813.33
AKSESORIS

PENGADAAN KABEL (KABEL DAYA, PANEL, TRAFO


4 SET 1 840,000,000.00 840,000,000.00
DLL )

5 PENYAMBUNGAN DAYA LISTRIK PLN 1400 KVA SET 1 1,423,800,000.00 1,423,800,000.00

SUB TOTAL 7,710,256,773.33

H1 KONSTRUKSI IPA TITAB ATAS(150 LT/DT) (BANGUNAN SIPIL)


HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6

1 PEKERJAAN BANGUNAN IPA 150 LT/DT LT/DT 150 20,944,294.83 3,141,644,224.16


2 PEKERJAAN BANGUNAN PENGELOLA BH 1 1,599,980,602.06 1,599,980,602.06
3 PEKERJAAN BANGUNAN KIMIA BH 1 1,134,373,823.76 1,134,373,823.76
4 PEKERJAAN RUMAH POMPA BH 1 566,132,652.74 566,132,652.74
5 PEKERJAAN RUMAH GENSET BH 1 622,629,100.88 622,629,100.88
6 PEKERJAAN BANGUNAN IPAL 100 LT/DT LT/DT 100 2,713,957.09 271,395,709.19
7 PEKERJAAN BANGUNAN RESERVOAR 800 m3 M3 800 2,046,039.84 1,636,831,870.50
8 PEKERJAAN POS JAGA BH 1 119,574,123.97 119,574,123.97
9 BANGUNAN ADAT PURA SET 1 1,635,938,096.14 1,635,938,096.14
10 PEKERJAAN LANDSCAPE m2 500 1,588,171.57 794,085,786.31
11 PEMATANGAN LAHAN SET 1 250,000,000.00 250,000,000.00
12 PEKERJAAN PAGAR m2 100 11,823,669.86 1,182,366,986.04

SUB TOTAL 12,954,952,975.74


H2 KONSTRUKSI IPA TITAB ATAS(150 LT/DT) (BANGUNAN M&E)

HARGA SATUAN JUMLAH


NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6

1 PEKERJAAN BANGUNAN KIMIA (M&E) LT/DT 100 21,069,363.72 2,106,936,371.80


2 PENYAMBUNGAN DAYA LISTRIK PLN 500 KVA SET 1 508,500,000.00 508,500,000.00
3 PENGADAAN INSTRUMEN DAN SISTEM OTOMATIS SET 1 3,916,000,000.00 3,916,000,000.00
4 PENGADAAN KABEL (KABEL DAYA, PANEL, TRAFO DLL SET 1 840,000,000.00 840,000,000.00
PENGADAAN DAN PEMASANGAN POMPA Q=40 ltr/dt
5 SET 2 199,854,648.00 399,709,296.00
H=65 m DAN AKSESORIS

PENGADAAN DAN PEMASANGAN GENSET DAN


6 SET 1 550,000,000.00 550,000,000.00
AKSESORIS

SUB TOTAL 8,321,145,667.80

I1 KONSTRUKSI IPA TITAB BAWAH(200 LT/DT) (BANGUNAN SIPIL)


HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6

1 PEKERJAAN BANGUNAN IPA 200 LT/DT LT/DT 200 20,944,294.83 4,188,858,965.55


2 PEKERJAAN BANGUNAN PENGELOLA BH 1 1,599,980,602.06 1,599,980,602.06
3 PEKERJAAN BANGUNAN KIMIA (SIPIL) BH 1 1,134,373,823.76 1,134,373,823.76
4 PEKERJAAN BANGUNAN GENSET M2 107 6,187,618.39 662,075,168.15
5 PEKERJAAN BANGUNAN IPAL 200 LT/DT LT/DT 200 2,713,957.09 542,791,418.37
6 PEKERJAAN RESERVOAR DISTRIBUSI MARGA 1100 M3 M3 1100 2,046,039.84 2,250,643,821.94
7 PEKERJAAN POS JAGA BH 1 119,574,123.97 119,574,123.97
8 BANGUNAN ADAT PURA SET 1 1,635,938,096.14 1,635,938,096.14
9 PEKERJAAN LANDSCAPE m2 600 1,588,171.57 952,902,943.57
10 PEMATANGAN LAHAN SET 1 250,000,000.00 250,000,000.00
11 PEKERJAAN PAGAR m2 100 11,823,669.86 1,182,366,986.04

SUB TOTAL 14,519,505,949.54

I2 KONSTRUKSI IPA TITAB BAWAH(200 LT/DT) (BANGUNAN M&E)

HARGA SATUAN JUMLAH


NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )

1 2 3 4 5 6

1 PEKERJAAN M&E PADA BANGUNAN KIMIA LT/DT 200 21,069,363.72 4,213,872,743.60


2 PENYAMBUNGAN DAYA LISTRIK PLN 350 KVA SET 1 355,950,000.00 355,950,000.00
3 PENGADAAN INSTRUMEN DAN SISTEM OTOMATIS SET 1 3,916,000,000.00 3,916,000,000.00
4 PENGADAAN KABEL (KABEL DAYA, PANEL,DLL ) SET 1 840,000,000.00 840,000,000.00

SUB TOTAL 9,325,822,743.60


REKAPITULASI
RINCIAN ESTIMASI BIAYA KONSTRUKSI
ALTERNATIF SISTEM POMPA DAN GRAVITASI
PEKERJAAN : REVIEW DED SPAM TITAB KABUPATEN BULELENG

JUMLAH
NO URAIAN PEKER JAAN
( Rp )

A PEKERJAAN PIPA TRANSMISI #NAME?


PEKERJAAN PERSIAPAN #NAME?
PEKERJAAN OPEN TRENCH DGN CLEAN CONSTRUCTION #NAME?
PEKERJAAN PERKERASAN /PENGASPALAN #NAME?
PEKERJAAN PENGADAAN PIPA DAN ACCESSORIES #NAME?
PEKERJAAN PEMASANGAN PIPA DAN ACCESSORIES #NAME?
PEKERJAAN PENGETESAN PIPA DAN ACCESSORIES #NAME?
PEKERJAAN FLUSHING PIPA DAN ACCESSORIES #NAME?

B PEKERJAAN PIPA DISTRIBUSI UTAMA #NAME?


PEKERJAAN PERSIAPAN #NAME?
PEKERJAAN OPEN TRENCH DGN CLEAN CONSTRUCTION #NAME?
PEKERJAAN PERKERASAN /PENGASPALAN #NAME?
PEKERJAAN PENGADAAN PIPA DAN ACCESSORIES #NAME?
PEKERJAAN PEMASANGAN PIPA DAN ACCESSORIES #NAME?
PEKERJAAN PENGETESAN PIPA DAN ACCESSORIES #NAME?
PEKERJAAN FLUSHING PIPA DAN ACCESSORIES #NAME?

C PEKERJAAN SIPIL PELENGKAP #NAME?


PEKERJAAN BOX VALVE #NAME?
PEKERJAAN JEMBATAN -
PEKERJAAN LAIN LAIN #NAME?

D PEKERJAAN PEMBANGUNAN RESERVOAR Err:509


BANGUNAN RESERVOAR PEJARAKAN Err:509
BANGUNAN RESERVOIR GEROKGAK Err:509
BANGUNAN RESERVOIR CELUKAN BAWANG Err:509
BANGUNAN RESERVOIR PANGKUNG PARUK Err:509
BANGUNAN RESERVOIR LOKAPAKSA Err:509
BANGUNAN RESERVOIR BENGKEL Err:509
BANGUNAN RESERVOIR GILIMANUK Err:509
BANGUNAN RESERVOIR TEGAL Err:509
BANGUNAN RESERVOIR TANGGUNG WISIA Err:509

E PEKERJAAN PEMBANGUNAN PRASEDIMENTASI Err:509


PEKERJAAN PIPA DARI INTAKE KE PRASEDIMENTASI Err:509
PEKERJAAN PERSIAPAN DAN UMUM -
PEKERJAAN RESERVOAR STABILISASI DAN RUMAH POMPA -
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
PEKERJAAN PENATAAN HALAMAN/LANSCAPE 215,602,087.65
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL DILUAR BANGUNAN 3,980,143,835.31
PEKERJAAN PERALATAN KANTOR, LAB DAN WORKSHOP 104,820,980.00
JUMLAH
NO URAIAN PEKER JAAN
( Rp )
F PEKERJAAN PEMBANGUNAN IPA ATAS (150 LT/DT) Err:509
PEKERJAAN PERSIAPAN DAN UMUM 1,000,000.00
PEKERJAAN IPA KAPASITAS 165 LT/DT (SIPIL) -
Err:509 Err:509
Err:509 Err:509
0 -
0 -
0 -
0 -
BANGUNAN ADAT PURA 571,822,156.82
PEKERJAAN HALAMAN/LANSCAPE 331,759,430.06
PEKERJAAN PAGAR 449,825,659.09
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL LUAR BANGUNAN 7,910,406,559.05
- 2,262,700.00

G PEKERJAAN PEMBANGUNAN IPA BAWAH (200 LT/DT) Err:509


PEKERJAAN PERSIAPAN DAN UMUM 1,000,000.00
PEKERJAAN BANGUNAN SIPIL -
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
PEKERJAAN HALAMAN/LANSCAPE 395,826,377.47
PEKERJAAN PAGAR Err:509
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL LUAR BANGUNAN 7,381,297,309.05
PEKERJAAN PERALATAN KANTOR, LAB DAN WORKSHOP 205,693,950.00

H P PEKERJAAN PIPA DISTRIBUSI, DAN BANGUNAN PELENGKAP 152,289,230,602.54


PEKERJAAN PERSIAPAN -
PEKERJAAN TANAH 31,045,263,453.69
PEKERJAAN PENGADAAN PIPA DAN ACCESSORIES 55,277,251,817.42
PEKERJAAN PEMASANGAN PIPA , ACCESSORIES DAN PENGETESAN 11,998,420,681.52
PEKERJAAN BANGUNAN SIPIL 2,806,763,032.85
PEKERJAAN LAIN LAIN 51,161,531,617.07

I PEKERJAAN PIPA PELAYANAN, DAN BANGUNAN PELENGKAP 99,813,614,243.07


PEKERJAAN PERSIAPAN -
PEKERJAAN TANAH 27,531,539,213.69
PEKERJAAN PENGADAAN PIPA DAN ACCESSORIES 29,950,488,517.25
PEKERJAAN PEMASANGAN PIPA , ACCESSORIES DAN PENGETESAN 6,597,490,368.58
PEKERJAAN BANGUNAN SIPIL 3,314,443,827.95
PEKERJAAN LAIN LAIN 32,419,652,315.61

JUMLAH #NAME?
PPN 10 % #NAME?
TOTAL #NAME?
DIBULATKAN #NAME?
REKAPITULASI
RINCIAN ESTIMASI BIAYA KONSTRUKSI
ALTERNATIF SISTEM POMPA DAN GRAVITASI
PEKERJAAN : REVIEW DED SPAM TITAB KABUPATEN BULELENG

JUMLAH
NO URAIAN PEKER JAAN
( Rp )

PEKERJAAN PIPA TRANSMISI


PEKERJAAN PERSIAPAN #NAME?
PEKERJAAN OPEN TRENCH DGN CLEAN CONSTRUCTION #NAME?
PEKERJAAN PERKERASAN /PENGASPALAN #NAME?
PEKERJAAN PENGADAAN PIPA DAN ACCESSORIES #NAME?
PEKERJAAN PEMASANGAN PIPA DAN ACCESSORIES #NAME?
PEKERJAAN PENGETESAN PIPA DAN ACCESSORIES #NAME?
PEKERJAAN FLUSHING PIPA DAN ACCESSORIES #NAME?

JUMLAH #NAME?
PPN 10 % #NAME?
TOTAL #NAME?
DIBULATKAN #NAME?
REKAPITULASI
RINCIAN ESTIMASI BIAYA KONSTRUKSI
ALTERNATIF SISTEM POMPA DAN GRAVITASI
PEKERJAAN : REVIEW DED SPAM TITAB KABUPATEN BULELENG

JUMLAH
NO URAIAN PEKER JAAN
( Rp )

A PEKERJAAN PIPA DISTRIBUSI UTAMA #NAME?


PEKERJAAN PERSIAPAN #NAME?
PEKERJAAN OPEN TRENCH DGN CLEAN CONSTRUCTION #NAME?
PEKERJAAN PERKERASAN /PENGASPALAN #NAME?
PEKERJAAN PENGADAAN PIPA DAN ACCESSORIES #NAME?
PEKERJAAN PEMASANGAN PIPA DAN ACCESSORIES #NAME?
PEKERJAAN PENGETESAN PIPA DAN ACCESSORIES #NAME?
PEKERJAAN FLUSHING PIPA DAN ACCESSORIES #NAME?

B PEKERJAAN SIPIL PELENGKAP #NAME?


PEKERJAAN BOX VALVE #NAME?
PEKERJAAN JEMBATAN -
PEKERJAAN LAIN LAIN #NAME?

C PEKERJAAN PEMBANGUNAN RESERVOAR Err:509


BANGUNAN RESERVOAR PEJARAKAN Err:509
BANGUNAN RESRVOAR PEMUTERAN #NAME?
BANGUNAN RESERVOIR GEROKGAK Err:509
BANGUNAN RESERVOIR CELUKAN BAWANG Err:509
BANGUNAN RESERVOIR PANGKUNG PARUK Err:509
BANGUNAN RESERVOIR LOKAPAKSA Err:509
BANGUNAN RESERVOIR BENGKEL Err:509
BANGUNAN RESERVOIR GILIMANUK Err:509
BANGUNAN RESERVOIR TEGAL Err:509
BANGUNAN RESERVOIR TANGGUNG WISIA Err:509

JUMLAH #NAME?
PPN 10 % #NAME?
TOTAL #NAME?
DIBULATKAN #NAME?
REKAPITULASI
RINCIAN ESTIMASI BIAYA KONSTRUKSI
ALTERNATIF SISTEM POMPA DAN GRAVITASI
PEKERJAAN : REVIEW DED SPAM TITAB KABUPATEN BULELENG

JUMLAH
NO URAIAN PEKER JAAN
( Rp )

SATKER PKPAM
I PEKERJAAN PIPA #NAME?
#NAME? #NAME?
#NAME? #NAME?
#NAME? #NAME?
#NAME? #NAME?
PEKERJAAN PIPA DARI RESV. LOKAPAKSA SAMPAI JALAN NASIONAL ( - 390 M) -
#NAME? #NAME?
#NAME? #NAME?
#NAME? #NAME?
#NAME? #NAME?
#NAME? #NAME?

IV PEKERJAAN PEMBANGUNAN IPA ATAS (165 LT/DT) Err:509


PEKERJAAN PERSIAPAN DAN UMUM 1,000,000.00
PEKERJAAN IPA KAPASITAS 165 LT/DT (SIPIL) -
Err:509 Err:509
Err:509 Err:509
0 -
0 -
0 -
0 -
BANGUNAN ADAT PURA 571,822,156.82
PEKERJAAN HALAMAN/LANSCAPE 331,759,430.06
PEKERJAAN PAGAR 449,825,659.09
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL LUAR BANGUNAN 7,910,406,559.05
PEKERJAAN PERALATAN KANTOR, LAB DAN WORKSHOP 205,693,950.00

V PEKERJAAN PEMBANGUNAN IPA BAWAH (185 LT/DT) Err:509


PEKERJAAN PERSIAPAN DAN UMUM 1,000,000.00
PEKERJAAN BANGUNAN SIPIL -
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
PEKERJAAN HALAMAN/LANSCAPE 395,826,377.47
PEKERJAAN PAGAR Err:509
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL LUAR BANGUNAN 7,381,297,309.05
PEKERJAAN PERALATAN KANTOR, LAB DAN WORKSHOP 205,693,950.00

JUMLAH Err:509
PPN 10 % Err:509
TOTAL Err:509
DIBULATKAN Err:509
REKAPITULASI
RINCIAN ESTIMASI BIAYA KONSTRUKSI
ALTERNATIF SISTEM POMPA DAN GRAVITASI
PEKERJAAN : REVIEW DED SPAM TITAB KABUPATEN BULELENG

JUMLAH
NO URAIAN PEKER JAAN
( Rp )

BALAI WILAYAH SUNGAI BALI PENIDA

I PEKERJAAN PIPA #NAME?


A #NAME? #NAME?
B #NAME? #NAME?
C #NAME? #NAME?

III PEKERJAAN PEMBANGUNAN PRASEDIMENTASI #REF!


PEKERJAAN PERSIAPAN DAN UMUM -
PEKERJAAN RESERVOAR STABILISASI DAN RUMAH POMPA #REF!
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
PEKERJAAN PENATAAN HALAMAN/LANSCAPE 215,602,087.65
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL DILUAR BANGUNAN 3,980,143,835.31
PEKERJAAN PERALATAN KANTOR, LAB DAN WORKSHOP 104,820,980.00

JUMLAH #REF!
PPN 10 % #REF!
TOTAL #REF!
DIBULATKAN #REF!
REKAPITULASI BIAYA KONSTRUKSI
JARINGAN PIPA TRANSMISI
SPAM TITAB KABUPATEN BULELENG

JUMLAH
NO URAIAN PEKER JAAN
( Rp )

I PEKERJAAN PIPA
A ### #NAME?
B ### #NAME?
C ### #NAME?
###
II PEKERJAAN BANGUNAN SIPIL
A PEKERJAAN BANGUNAN BAK INTAKE DAN RUMAH POMPA #REF!
B PEKERJAAN BANGUNAN RUMAH GENSET Err:509
C PEKERJAAN BANGUNAN RUMAH JAGA 52,532,023.10
D PEKERJAAN PENATAAN HALAMAN/LANSCAPE 215,602,087.65

III PEKERJAAN MEKANIKAL DAN ELEKTRIKAL


A PEKERJAAN MEKANIKAL DAN ELEKTRIKAL BANGUNAN BAK INTAKE DAN RUMAH POMPA 14,900,363,651.52
B PEKERJAAN MEKANIKAL DAN ELEKTRIKAL BANGUNAN GENSET 4,861,615,413.72
C PEKERJAAN MEKANIKAL DAN ELEKTRIKAL DILUAR BANGUNAN 3,980,143,835.31
D PEKERJAAN PERALATAN KANTOR, LAB DAN WORKSHOP 104,820,980.00

JUMLAH #REF!
PPN 10 % #REF!
TOTAL #REF!
DIBULATKAN #REF!
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6

BOX VALVE #NAME?

III Box Gate Valve (Pipa dia 273,05 mm) unit #NAME? - #NAME?
Uraian pekerjaan per 1 unit bangunan :
1 Galian Tanah Biasa m3 4.78 - -
2 Urugan Pasir m3 0.11 - -
3 Pekerjaan Plesteran 1 : 2 m2 15.79 - -
4 Pekerjaan Acian 1 : 2 m2 15.79 - -
5 Beton Camp. 1smn : 3 psr : 5 krl m3 0.11 - -
6 Beton Camp. 1smn : 11/2 psr : 2 1/2 krl m3 1.59 - -
7 Baja Tulangan kg 442.70 - -
8 Begisting m2 11.83 - -
Sub Jumlah V Rp 0.00
IV Box Gate Valve (Pipa dia 355,6 mm) unit #NAME? - #NAME?
Uraian pekerjaan per 1 unit bangunan :
1 Galian Tanah Biasa m3 4.96 - -
2 Urugan Pasir m3 0.11 - -
3 Pekerjaan Plesteran 1 : 2 m2 16.29 - -
4 Pekerjaan Acian 1 : 2 m2 16.29 - -
5 Beton Camp. 1smn : 3 psr : 5 krl m3 0.11 - -
6 Beton Camp. 1smn : 11/2 psr : 2 1/2 krl m3 1.64 - -
7 Baja Tulangan kg 456.81 - -
8 Begisting m2 12.33 - -
Sub Jumlah V Rp 0.00
V Box Gate Valve (Pipa dia 355 mm) unit #NAME? - #NAME?
Uraian pekerjaan per 1 unit bangunan :
1 Galian Tanah Biasa m3 4.96 - -
2 Urugan Pasir m3 0.11 - -
3 Pekerjaan Plesteran 1 : 2 m2 16.28 - -
4 Pekerjaan Acian 1 : 2 m2 16.28 - -
5 Beton Camp. 1smn : 3 psr : 5 krl m3 0.11 - -
6 Beton Camp. 1smn : 11/2 psr : 2 1/2 krl m3 1.64 - -
7 Baja Tulangan kg 456.76 - -
8 Begisting m2 12.32 - -
Sub Jumlah V Rp 0.00
VI Box Gate Valve (Pipa dia 457,2 mm) unit #NAME? - #NAME?
Uraian pekerjaan per 1 unit bangunan :
1 Galian Tanah Biasa m3 5.19 - -
2 Urugan Pasir m3 0.11 - -
3 Pekerjaan Plesteran 1 : 2 m2 16.90 - -
4 Pekerjaan Acian 1 : 2 m2 16.90 - -
5 Beton Camp. 1smn : 3 psr : 5 krl m3 0.11 - -
6 Beton Camp. 1smn : 11/2 psr : 2 1/2 krl m3 1.70 - -
7 Baja Tulangan kg 472.42 - -
8 Begisting m2 12.94 - -
Sub Jumlah V Rp 0.00
VII Box Gate Valve (Pipa dia 508 mm) unit #NAME? - #NAME?
Uraian pekerjaan per 1 unit bangunan :
1 Galian Tanah Biasa m3 8.51 - -
2 Urugan Pasir m3 0.18 - -
3 Pekerjaan Plesteran 1 : 2 m2 22.01 - -
4 Pekerjaan Acian 1 : 2 m2 22.01 - -
5 Beton Camp. 1smn : 3 psr : 5 krl m3 0.18 - -
6 Beton Camp. 1smn : 11/2 psr : 2 1/2 krl m3 2.28 - -
7 Baja Tulangan kg 628.26 - -
8 Begisting m2 16.69 - -
Sub Jumlah V Rp 0.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6

JEMBATAN 0.00

JEMBATAN STA 19+315

II Jembatan Pipa, Panjang = 10 m' Unit

Uraian pekerjaan per 1 unit bangunan :


1 Galian Tanah berbatu m3 13.94 - -
2 Galian tanah biasa m3 32.52 - -
3 Urugan tanah kembali dipadatkan m3 7.58 - -
4 Urugan Pasir m3 0.24 - -
5 Beton Cyclop m3 11.28 - -
6 Beton K225 m3 6.25 - -
7 Beton K300 m3 10.72 - -
8 Baja Frofil dengan Pengelasan kg 918.80 - -
9 Plat Andas dan Plat Sambung kg 325.57 - -
10 Pelat buhul / pengaku kg 110.10 - -
11 Stiffener kg 61.54 - -
12 Baja Tulangan kg 2,502.36 - -
13 Begesting Batako kg 6.00 - -
14 Begisting m2 33.80 - -
15 Baut 3/4" bh 156.00 - -
16 Pelat Klem pipa bh 11.00 - -
17 Besi dia 20 mm kg 36.25 - -
18 Cat Jembatan + Pipa m2 49.10 - -
Sub Jumlah VI Rp 0.00

JEMBATAN STA 20+515

II Jembatan Pipa, Panjang = 10 m' Unit

Uraian pekerjaan per 1 unit bangunan :


1 Galian Tanah berbatu m3 13.71 - -
2 Galian tanah biasa m3 32.00 - -
3 Urugan tanah kembali dipadatkan m3 7.58 - -
4 Urugan Pasir m3 0.24 - -
5 Beton Cyclop m3 11.29 - -
6 Beton K225 m3 6.25 - -
7 Beton K300 m3 10.72 - -
8 Baja Frofil dengan Pengelasan kg 918.80 - -
9 Plat Andas dan Plat Sambung kg 325.57 - -
10 Pelat buhul / pengaku kg 154.13 - -
11 Stiffener kg 61.54 - -
12 Baja Tulangan kg 2,502.36 - -
13 Begesting Batako kg 6.00 - -
14 Begisting m2 33.80 - -
15 Baut 3/4" bh 156.00 - -
16 Pelat Klem pipa bh 11.00 - -
17 Besi dia 20 mm kg 36.25 - -
18 Cat Jembatan + Pipa m2 49.23 - -
Sub Jumlah VI Rp 0.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
JEMBATAN STA 5+387

II Jembatan Pipa, Panjang = 34 m' Unit

Uraian pekerjaan per 1 unit bangunan :


1 Galian Tanah berbatu m3 46.71 - -
2 Galian tanah biasa m3 108.99 - -
3 Urugan tanah kembali dipadatkan m3 31.00 - -
4 Urugan Pasir m3 0.24 - -
5 Beton Cyclop m3 - - -
6 Beton K225 m3 - - -
7 Beton K300 m3 125.01 - -
8 Baja Frofil dengan Pengelasan kg 4,632.12 - -
9 Plat Andas dan Plat Sambung kg 809.23 - -
10 Pelat buhul / pengaku kg 309.09 - -
11 Stiffener kg 326.98 - -
12 Baja Tulangan kg 10,320.92 - -
13 Begesting Batako kg 21.60 - -
14 Begisting m2 272.91 - -
15 Baut 3/4" bh 884.00 - -
16 Pelat Klem pipa bh 35.00 - -
17 Besi dia 20 mm kg 36.15 - -
18 Cat Jembatan + Pipa m2 177.46 - -
Sub Jumlah VI Rp 0.00

JEMBATAN STA 7+950

II Jembatan Pipa, Panjang = 30 m' Unit


Uraian pekerjaan per 1 unit bangunan :
1 Galian Tanah berbatu m3 36.18 - -
2 Galian tanah biasa m3 84.42 - -
3 Urugan tanah kembali dipadatkan m3 13.42 - -
4 Urugan Pasir m3 0.39 - -
5 Beton Cyclop m3 18.67 - -
6 Beton K225 m3 10.33 - -
7 Beton K300 m3 24.11 - -
8 Baja Frofil dengan Pengelasan kg 5,313.15 - -
9 Plat Andas dan Plat Sambung kg 750.20 - -
10 Pelat buhul / pengaku kg 104.03 - -
11 Stiffener kg 339.51 - -
12 Baja Tulangan kg 4,204.37 - -
13 Begesting Batako kg 10.45 - -
14 Begisting m2 76.05 - -
15 Baut 3/4" bh 956.00 - -
16 Pelat Klem pipa bh 31.00 - -
17 Besi dia 20 mm kg 36.15 - -
18 Cat Jembatan + Pipa m2 166.82 - -
Sub Jumlah VI Rp 0.00
JEMBATAN STA 8+350

II Jembatan Pipa, Panjang = 48 m' Unit


Uraian pekerjaan per 1 unit bangunan :
1 Galian Tanah berbatu m3 48.63 - -
2 Galian tanah biasa m3 113.46 - -
3 Urugan tanah kembali dipadatkan m3 36.70 - -
4 Urugan Pasir m3 0.79 - -
5 Beton Cyclop m3 37.35 - -
6 Beton K225 m3 20.66 - -
7 Beton K300 m3 50.90 - -
8 Baja Frofil dengan Pengelasan kg 7,991.55 - -
9 Plat Andas dan Plat Sambung kg 1,167.20 - -
10 Pelat buhul / pengaku kg 144.24 - -
11 Stiffener kg 509.07 - -
12 Baja Tulangan kg 8,420.82 - -
13 Begesting Batako kg 20.90 - -
14 Begisting m2 165.03 - -
15 Baut 3/4" bh 1,316.00 - -
16 Pelat Klem pipa bh 49.00 - -
17 Besi dia 20 mm kg 36.15 - -
18 Cat Jembatan + Pipa m2 267.59 - -
Sub Jumlah VI Rp 0.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
JEMBATAN STA 4+810

II Jembatan Pipa, Panjang = 6 m' Unit

Uraian pekerjaan per 1 unit bangunan :


1 Galian Tanah berbatu m3 7.10 - -
2 Galian tanah biasa m3 16.58 - -
3 Urugan tanah kembali dipadatkan m3 8.25 - -
4 Urugan Pasir m3 0.37 - -
5 Beton Rabat (Camp 1:3:5) m3 - - -
6 Beton K300 m3 16.01 - -
7 Baja Frofil dengan Pengelasan kg 926.40 - -
8 Plat Andas dan Plat Sambung kg 105.98 - -
9 Pelat buhul / pengaku kg 88.08 - -
10 Stiffener kg 36.93 - -
11 Baja Tulangan kg 2,590.30 - -
12 Begesting Batako kg 9.60 - -
13 Begisting m2 40.54 - -
14 Baut 3/4" bh 32.00 - -
15 Pelat Klem pipa bh 8.00 - -
16 Besi dia 20 mm kg 36.25 - -
17 Cat Jembatan + Pipa m2 27.79 - -
Sub Jumlah VI Rp 0.00

JEMBATAN STA 13+625/35+870

II Jembatan Pipa, Panjang = 10 m' Unit

Uraian pekerjaan per 1 unit bangunan :


1 Galian Tanah berbatu m3 15.25 - -
2 Galian tanah biasa m3 35.58 - -
3 Urugan tanah kembali dipadatkan m3 13.23 - -
4 Urugan Pasir m3 0.75 - -
5 Beton Cyclop m3 - - -
6 Beton K225 m3 - - -
7 Beton K300 m3 23.96 - -
8 Baja Frofil dengan Pengelasan kg 1,285.80 - -
9 Plat Andas dan Plat Sambung kg 372.30 - -
10 Pelat buhul / pengaku kg 154.13 - -
11 Stiffener kg 92.32 - -
12 Baja Tulangan kg 3,444.23 - -
13 Begesting Batako kg 9.60 - -
14 Begisting m2 67.34 - -
15 Baut 3/4" bh 172.00 - -
16 Pelat Klem pipa bh 11.00 - -
17 Besi dia 20 mm kg 36.25 - -
18 Cat Jembatan + Pipa m2 68.11 - -
Sub Jumlah VI Rp 0.00

JEMBATAN STA 26+745

II Jembatan Pipa, Panjang = 15 m' Unit

Uraian pekerjaan per 1 unit bangunan :


1 Galian Tanah berbatu m3 49.41 - -
2 Galian tanah biasa m3 115.28 - -
3 Urugan tanah kembali dipadatkan m3 26.30 - -
4 Urugan Pasir m3 0.70 - -
5 Beton Cyclop m3 - - -
6 Beton K225 m3 - - -
7 Beton K300 m3 68.74 - -
8 Baja Frofil dengan Pengelasan kg 2,248.80 - -
9 Plat Andas dan Plat Sambung kg 386.31 - -
10 Pelat buhul / pengaku kg 224.20 - -
11 Stiffener kg 92.32 - -
12 Baja Tulangan kg 4,944.31 - -
13 Begesting Batako kg 13.20 - -
14 Begisting m2 145.94 - -
15 Baut 3/4" bh 352.00 - -
16 Pelat Klem pipa bh 16.00 - -
17 Besi dia 20 mm kg 36.25 - -
18 Cat Jembatan + Pipa m2 84.41 - -
Sub Jumlah VI Rp 0.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
JEMBATAN STA 29+640/19+805

II Jembatan Pipa, Panjang = 18 m' Unit

Uraian pekerjaan per 1 unit bangunan :


1 Galian Tanah berbatu m3 52.52 - -
2 Galian tanah biasa m3 122.54 - -
3 Urugan tanah kembali dipadatkan m3 26.30 - -
4 Urugan Pasir m3 0.70 - -
5 Beton Cyclop m3 - - -
6 Beton K225 m3 - - -
7 Beton K300 m3 71.74 - -
8 Baja Frofil dengan Pengelasan kg 3,358.24 - -
9 Plat Andas dan Plat Sambung kg 452.96 - -
10 Pelat buhul / pengaku kg 266.23 - -
11 Stiffener kg 185.32 - -
12 Baja Tulangan kg 6,144.62 - -
13 Begesting Batako kg 13.20 - -
14 Begisting m2 152.18 - -
15 Baut 3/4" bh 468.00 - -
16 Pelat Klem pipa bh 19.00 - -
17 Besi dia 20 mm kg 36.15 - -
18 Cat Jembatan + Pipa m2 100.72 - -
Sub Jumlah VI Rp 0.00

JEMBATAN STA 26+515/22+925

II Jembatan Pipa, Panjang = 50 m' Unit

Uraian pekerjaan per 1 unit bangunan :


1 Galian Tanah berbatu m3 30.38 - -
2 Galian tanah biasa m3 70.89 - -
3 Urugan tanah kembali dipadatkan m3 72.35 - -
4 Urugan Pasir m3 1.15 - -
5 Beton Cyclop m3 - - -
6 Beton K225 m3 - - -
7 Beton K300 m3 101.56 - -
8 Baja Frofil dengan Pengelasan kg 9,121.51 - -
9 Plat Andas dan Plat Sambung kg 1,540.48 - -
10 Pelat buhul / pengaku kg 714.62 - -
11 Stiffener kg 562.06 - -
12 Baja Tulangan kg 8,952.69 - -
13 Begesting Batako kg 21.00 - -
14 Begisting m2 224.11 - -
15 Baut 3/4" bh 1,708.00 - -
16 Pelat Klem pipa bh 51.00 - -
17 Besi dia 20 mm kg 36.15 - -
18 Cat Jembatan + Pipa m2 301.13 - -
Sub Jumlah VI Rp 0.00

JEMBATAN STA 31+590

II Jembatan Pipa, Panjang = 6 m' Unit

Uraian pekerjaan per 1 unit bangunan :


1 Galian Tanah berbatu m3 8.99 - -
2 Galian tanah biasa m3 20.97 - -
3 Urugan tanah kembali dipadatkan m3 8.87 - -
4 Urugan Pasir m3 0.70 - -
5 Beton Cyclop m3 11.28 - -
6 Beton K225 m3 6.25 - -
7 Beton K300 m3 12.48 - -
8 Baja Frofil dengan Pengelasan kg 574.80 - -
9 Plat Andas dan Plat Sambung kg 105.98 - -
10 Pelat buhul / pengaku kg 112.10 - -
11 Stiffener kg 36.93 - -
12 Baja Tulangan kg 2,706.04 - -
13 Begesting Batako kg 6.00 - -
14 Begisting m2 42.05 - -
15 Baut 3/4" bh 32.00 - -
16 Pelat Klem pipa bh 8.00 - -
17 Besi dia 20 mm kg 36.25 - -
18 Cat Jembatan + Pipa m2 27.86 - -
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6

Sub Jumlah VI Rp 0.00


HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
JEMBATAN STA 33+830/15+610

II Jembatan Pipa, Panjang = 15 m' Unit

Uraian pekerjaan per 1 unit bangunan :


1 Galian Tanah berbatu m3 21.92 - -
2 Galian tanah biasa m3 51.14 - -
3 Urugan tanah kembali dipadatkan m3 5.40 - -
4 Urugan Pasir m3 0.37 - -
5 Beton Cyclop m3 - - -
6 Beton K225 m3 - - -
7 Beton K300 m3 26.24 - -
8 Baja Frofil dengan Pengelasan kg 2,248.80 - -
9 Plat Andas dan Plat Sambung kg 395.66 - -
10 Pelat buhul / pengaku kg 224.20 - -
11 Stiffener kg 92.32 - -
12 Baja Tulangan kg 3,684.00 - -
13 Begesting Batako kg 9.60 - -
14 Begisting m2 73.98 - -
15 Baut 3/4" bh 352.00 - -
16 Pelat Klem pipa bh 16.00 - -
17 Besi dia 20 mm kg 36.25 - -
18 Cat Jembatan + Pipa m2 83.86 - -
Sub Jumlah VI Rp 0.00

JEMBATAN STA 33+675/15+765

II Jembatan Pipa, Panjang = 38,5 m' Unit

Uraian pekerjaan per 1 unit bangunan :


1 Galian Tanah berbatu m3 45.68 - -
2 Galian tanah biasa m3 106.58 - -
3 Urugan tanah kembali dipadatkan m3 21.17 - -
4 Urugan Pasir m3 1.01 - -
5 Beton Cyclop m3 - - -
6 Beton K225 m3 - - -
7 Beton K300 m3 84.88 - -
8 Baja Frofil dengan Pengelasan kg 6,391.64 - -
9 Plat Andas dan Plat Sambung kg 1,076.72 - -
10 Pelat buhul / pengaku kg 546.48 - -
11 Stiffener kg 359.40 - -
12 Baja Tulangan kg 7,892.47 - -
13 Begesting Batako kg 20.10 - -
14 Begisting m2 195.07 - -
15 Baut 3/4" bh 1,220.00 - -
16 Pelat Klem pipa bh 39.00 - -
17 Besi dia 20 mm kg 36.15 - -
18 Cat Jembatan + Pipa m2 232.02 - -
Sub Jumlah VI Rp 0.00

STA 39+060 , STA 40+055, STA 40+317, STA 40+495, STA 40+890, STA 41+583, STA 42+065, STA 42+165

II Jembatan Pipa, Panjang = 6 m' Unit 8 -

Uraian pekerjaan per 1 unit bangunan :


1 Galian Tanah berbatu m3 22.86 - -
2 Galian tanah biasa m3 53.35 - -
3 Urugan tanah kembali dipadatkan m3 30.01 - -
4 Urugan Pasir m3 1.12 - -
5 Beton Cyclop m3 18.66 - -
6 Beton K225 m3 10.33 - -
7 Beton K300 m3 18.13 - -
8 Baja Frofil dengan Pengelasan kg 574.80 - -
9 Plat Andas dan Plat Sambung kg 105.98 - -
10 Pelat buhul / pengaku kg 98.44 - -
11 Stiffener kg 36.93 - -
12 Baja Tulangan kg 3,411.09 - -
13 Begesting Batako kg 10.45 - -
14 Begisting m2 48.62 - -
15 Baut 3/4" bh 32.00 - -
16 Pelat Klem pipa bh 8.00 - -
17 Besi dia 20 mm kg 36.25 - -
18 Cat Jembatan + Pipa m2 27.84 - -
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6

Sub Jumlah VI Rp 0.00


HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
JEMBATAN STA 36+800

II Jembatan Pipa, Panjang = 6 m' Unit

Uraian pekerjaan per 1 unit bangunan :


1 Galian Tanah berbatu m3 17.51 - -
2 Galian tanah biasa m3 40.87 - -
3 Urugan tanah kembali dipadatkan m3 35.71 - -
4 Urugan Pasir m3 0.70 - -
5 Beton Cyclop m3 11.28 - -
6 Beton K225 m3 6.25 - -
7 Beton K300 m3 15.27 - -
8 Baja Frofil dengan Pengelasan kg 574.80 - -
9 Plat Andas dan Plat Sambung kg 105.98 - -
10 Pelat buhul / pengaku kg 80.07 - -
11 Stiffener kg 36.93 - -
12 Baja Tulangan kg 3,020.57 - -
13 Begesting Batako kg 6.00 - -
14 Begisting m2 55.07 - -
15 Baut 3/4" bh 32.00 - -
16 Pelat Klem pipa bh 8.00 - -
17 Besi dia 20 mm kg 36.25 - -
18 Cat Jembatan + Pipa m2 27.77 - -
Sub Jumlah VI Rp 0.00

JEMBATAN STA 35+485/13+965

II Jembatan Pipa, Panjang = 21 m' Unit

Uraian pekerjaan per 1 unit bangunan :


1 Galian Tanah berbatu m3 25.58 - -
2 Galian tanah biasa m3 59.68 - -
3 Urugan tanah kembali dipadatkan m3 10.48 - -
4 Urugan Pasir m3 0.61 - -
5 Beton Cyclop m3 - - -
6 Beton K225 m3 - - -
7 Beton K300 m3 57.66 - -
8 Baja Frofil dengan Pengelasan kg 4,264.54 - -
9 Plat Andas dan Plat Sambung kg 593.13 - -
10 Pelat buhul / pengaku kg 308.27 - -
11 Stiffener kg 210.19 - -
12 Baja Tulangan kg 4,618.02 - -
13 Begesting Batako kg 12.60 - -
14 Begisting m2 128.45 - -
15 Baut 3/4" bh 624.00 - -
16 Pelat Klem pipa bh 22.00 - -
17 Besi dia 20 mm kg 36.15 - -
18 Cat Jembatan + Pipa m2 112.07 - -
Sub Jumlah VI Rp 0.00

JEMBATAN

II Jembatan Pipa, Panjang = 6 m' Unit

Uraian pekerjaan per 1 unit bangunan :


1 Galian Tanah berbatu m3 14.35 - -
2 Galian tanah biasa m3 33.49 - -
3 Urugan tanah kembali dipadatkan m3 23.04 - -
4 Urugan Pasir m3 0.70 - -
5 Beton Cyclop m3 11.28 - -
6 Beton K225 m3 6.25 - -
7 Beton K300 m3 14.83 - -
8 Baja Frofil dengan Pengelasan kg 574.80 - -
9 Plat Andas dan Plat Sambung kg 105.98 - -
10 Pelat buhul / pengaku kg 23.55 - -
11 Stiffener kg 36.93 - -
12 Baja Tulangan kg 2,967.83 - -
13 Begesting Batako kg 6.00 - -
14 Begisting m2 52.98 - -
15 Baut 3/4" bh 32.00 - -
16 Pelat Klem pipa bh 8.00 - -
17 Besi dia 20 mm kg 36.25 - -
18 Cat Jembatan + Pipa m2 27.48 - -
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6

Sub Jumlah VI Rp 0.00


HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
JEMBATAN

II Jembatan Pipa, Panjang = 30 m' Unit

Uraian pekerjaan per 1 unit bangunan :


1 Galian Tanah berbatu m3 24.40 - -
2 Galian tanah biasa m3 56.93 - -
3 Urugan tanah kembali dipadatkan m3 43.43 - -
4 Urugan Pasir m3 0.39 - -
5 Beton Cyclop m3 18.67 - -
6 Beton K225 m3 10.33 - -
7 Beton K300 m3 23.84 - -
8 Baja Frofil dengan Pengelasan kg 5,152.12 - -
9 Plat Andas dan Plat Sambung kg 728.63 - -
10 Pelat buhul / pengaku kg 91.26 - -
11 Stiffener kg 293.83 - -
12 Baja Tulangan kg 4,167.81 - -
13 Begesting Batako kg 10.45 - -
14 Begisting m2 74.57 - -
15 Baut 3/4" bh 804.00 - -
16 Pelat Klem pipa bh 31.00 - -
17 Besi dia 20 mm kg 36.15 - -
18 Cat Jembatan + Pipa m2 167.21 - -
Sub Jumlah VI Rp 0.00

JEMBATAN STA 0+550

II Jembatan Pipa, Panjang = 48 m' Unit

Uraian pekerjaan per 1 unit bangunan :


1 Galian Tanah berbatu m3 49.09 - -
2 Galian tanah biasa m3 114.53 - -
3 Urugan tanah kembali dipadatkan m3 34.66 - -
4 Urugan Pasir r m3 0.59 - -
5 Beton Cyclop m3 28.01 - -
6 Beton K225 m3 15.49 - -
7 Beton K300 m3 61.95 - -
8 Baja Frofil dengan Pengelasan kg 8,951.55 - -
9 Plat Andas dan Plat Sambung kg 1,167.20 - -
10 Pelat buhul / pengaku kg 253.87 - -
11 Stiffener kg 509.07 - -
12 Baja Tulangan kg 9,229.89 - -
13 Begesting Batako kg 15.67 - -
14 Begisting m2 235.90 - -
15 Baut 3/4" bh 1,428.00 - -
16 Pelat Klem pipa bh 49.00 - -
17 Besi dia 20 mm kg 36.15 - -
18 Cat Jembatan + Pipa m2 269.13 - -
Sub Jumlah VI Rp 0.00

JEMBATAN STA 1+200/50+700

II Jembatan Pipa, Panjang = 12 m' Unit

Uraian pekerjaan per 1 unit bangunan :


1 Galian Tanah berbatu m3 17.21 - -
2 Galian tanah biasa m3 40.16 - -
3 Urugan tanah kembali dipadatkan m3 20.17 - -
4 Urugan Pasir m3 0.97 - -
5 Beton Cyclop m3 - - -
6 Beton K225 m3 - - -
7 Beton K300 m3 23.72 - -
8 Baja Frofil dengan Pengelasan kg 2,248.80 - -
9 Plat Andas dan Plat Sambung kg 501.63 - -
10 Pelat buhul / pengaku kg 169.56 - -
11 Stiffener kg 92.32 - -
12 Baja Tulangan kg 3,157.08 - -
13 Begesting Batako kg 11.40 - -
14 Begisting m2 54.73 - -
15 Baut 3/4" bh 320.00 - -
16 Pelat Klem pipa bh 16.00 - -
17 Besi dia 20 mm kg 36.25 - -
18 Cat Jembatan + Pipa m2 84.41 - -
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6

Sub Jumlah VI Rp 0.00


HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
JEMBATAN STA 6+895/56+395

II Jembatan Pipa, Panjang = 12 m' Unit

Uraian pekerjaan per 1 unit bangunan :


1 Galian Tanah berbatu m3 17.37 - -
2 Galian tanah biasa m3 40.53 - -
3 Urugan tanah kembali dipadatkan m3 20.17 - -
4 Urugan Pasir m3 0.97 - -
5 Beton Cyclop m3 11.28 - -
6 Beton K225 m3 6.25 - -
7 Beton K300 m3 23.72 - -
8 Baja Frofil dengan Pengelasan kg 2,248.80 - -
9 Plat Andas dan Plat Sambung kg 501.63 - -
10 Pelat buhul / pengaku kg 169.56 - -
11 Stiffener kg 92.32 - -
12 Baja Tulangan kg 3,796.15 - -
13 Begesting Batako kg 11.40 - -
14 Begisting m2 54.73 - -
15 Baut 3/4" bh 320.00 - -
16 Pelat Klem pipa bh 16.00 - -
17 Besi dia 20 mm kg 36.25 - -
18 Cat Jembatan + Pipa m2 84.41 - -
Sub Jumlah VI Rp 0.00

JEMBATAN STA 2+140/51+640

II Jembatan Pipa, Panjang = 8 m' Unit

Uraian pekerjaan per 1 unit bangunan :


1 Galian Tanah berbatu m3 17.21 - -
2 Galian tanah biasa m3 40.16 - -
3 Urugan tanah kembali dipadatkan m3 20.17 - -
4 Urugan Pasir m3 0.97 - -
5 Beton Cyclop m3 - - -
6 Beton K225 m3 - - -
7 Beton K300 m3 23.72 - -
8 Baja Frofil dengan Pengelasan kg 1,885.20 - -
9 Plat Andas dan Plat Sambung kg 386.31 - -
10 Pelat buhul / pengaku kg 148.37 - -
11 Stiffener kg 76.93 - -
12 Baja Tulangan kg 3,157.08 - -
13 Begesting Batako kg 11.40 - -
14 Begisting m2 54.73 - -
15 Baut 3/4" bh 168.00 - -
16 Pelat Klem pipa bh 14.00 - -
17 Besi dia 20 mm kg 36.25 - -
18 Cat Jembatan + Pipa m2 71.70 - -
Sub Jumlah VI Rp 0.00

JEMBATAN STA 10+975/60+475

II Jembatan Pipa, Panjang = 9 m' Unit

Uraian pekerjaan per 1 unit bangunan :


1 Galian Tanah berbatu m3 17.00 - -
2 Galian tanah biasa m3 39.66 - -
3 Urugan tanah kembali dipadatkan m3 20.17 - -
4 Urugan Pasir m3 0.97 - -
5 Beton Cyclop m3 - - -
6 Beton K225 m3 - - -
7 Beton K300 m3 23.72 - -
8 Baja Frofil dengan Pengelasan kg 1,860.00 - -
9 Plat Andas dan Plat Sambung kg 386.31 - -
10 Pelat buhul / pengaku kg 132.47 - -
11 Stiffener kg 76.93 - -
12 Baja Tulangan kg 3,157.08 - -
13 Begesting Batako kg 11.40 - -
14 Begisting m2 54.73 - -
15 Baut 3/4" bh 162.00 - -
16 Pelat Klem pipa bh 12.50 - -
17 Besi dia 20 mm kg 36.25 - -
18 Cat Jembatan + Pipa m2 70.51 - -
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6

Sub Jumlah VI Rp 0.00


HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
JEMBATAN STA 12+665/62+165

II Jembatan Pipa, Panjang = 6 m' Unit

Uraian pekerjaan per 1 unit bangunan :


1 Galian Tanah berbatu m3 8.93 - -
2 Galian tanah biasa m3 20.83 - -
3 Urugan tanah kembali dipadatkan m3 6.48 - -
4 Urugan Pasir m3 0.75 - -
5 Beton Cyclop m3 - - -
6 Beton K225 m3 - - -
7 Beton K300 m3 80.79 - -
8 Baja Frofil dengan Pengelasan kg 1,504.80 - -
9 Plat Andas dan Plat Sambung kg 386.31 - -
10 Pelat buhul / pengaku kg 116.57 - -
11 Stiffener kg 61.54 - -
12 Baja Tulangan kg 1,962.27 - -
13 Begesting Batako kg 9.60 - -
14 Begisting m2 286.52 - -
15 Baut 3/4" bh 268.00 - -
16 Pelat Klem pipa bh 11.00 - -
17 Besi dia 20 mm kg 36.25 - -
18 Cat Jembatan + Pipa m2 52.44 - -
Sub Jumlah VI Rp 0.00

JEMBATAN STA 10+365/59+865

II Jembatan Pipa, Panjang = 9 m' Unit

Uraian pekerjaan per 1 unit bangunan :


1 Galian Tanah berbatu m3 17.21 - -
2 Galian tanah biasa m3 40.16 - -
3 Urugan tanah kembali dipadatkan m3 20.17 - -
4 Urugan Pasir m3 0.97 - -
5 Beton Cyclop m3 - - -
6 Beton K225 m3 - - -
7 Beton K300 m3 23.72 - -
8 Baja Frofil dengan Pengelasan kg 1,885.20 - -
9 Plat Andas dan Plat Sambung kg 386.31 - -
10 Pelat buhul / pengaku kg 148.37 - -
11 Stiffener kg 76.93 - -
12 Baja Tulangan kg 3,157.08 - -
13 Begesting Batako kg 11.40 - -
14 Begisting m2 54.73 - -
15 Baut 3/4" bh 168.00 - -
16 Pelat Klem pipa bh 14.00 - -
17 Besi dia 20 mm kg 36.25 - -
18 Cat Jembatan + Pipa m2 71.70 - -
Sub Jumlah VI Rp 0.00

JEMBATAN STA 5+785/55+285

II Jembatan Pipa, Panjang = 12 m' Unit

Uraian pekerjaan per 1 unit bangunan :


1 Galian Tanah berbatu m3 14.44 - -
2 Galian tanah biasa m3 33.69 - -
3 Urugan tanah kembali dipadatkan m3 13.52 - -
4 Urugan Pasir m3 0.70 - -
5 Beton Cyclop m3 11.28 - -
6 Beton K225 m3 6.25 - -
7 Beton K300 m3 11.49 - -
8 Baja Frofil dengan Pengelasan kg 1,991.93 - -
9 Plat Andas dan Plat Sambung kg 105.98 - -
10 Pelat buhul / pengaku kg 1,261.10 - -
11 Stiffener kg 78.41 - -
12 Baja Tulangan kg 2,611.05 - -
13 Begesting Batako kg 6.00 - -
14 Begisting m2 37.49 - -
15 Baut 3/4" bh 184.00 - -
16 Pelat Klem pipa bh 15.00 - -
17 Besi dia 20 mm kg 36.25 - -
18 Cat Jembatan + Pipa m2 66.66 - -
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6

Sub Jumlah VI Rp 0.00


HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
JEMBATAN STA 11+960/17+074

II Jembatan Pipa, Panjang = 9 m' Unit

Uraian pekerjaan per 1 unit bangunan :


1 Galian Tanah berbatu m3 14.97 - -
2 Galian tanah biasa m3 34.94 - -
3 Urugan tanah kembali dipadatkan m3 11.49 - -
4 Urugan Pasir m3 0.70 - -
5 Beton Cyclop m3 11.28 - -
6 Beton K225 m3 6.25 - -
7 Beton K300 m3 14.11 - -
8 Baja Frofil dengan Pengelasan kg 828.60 - -
9 Plat Andas dan Plat Sambung kg 215.77 - -
10 Pelat buhul / pengaku kg 29.44 - -
11 Stiffener kg 55.39 - -
12 Baja Tulangan kg 2,906.50 - -
13 Begesting Batako kg 6.00 - -
14 Begisting m2 49.56 - -
15 Baut 3/4" bh 152.00 - -
16 Pelat Klem pipa bh 10.00 - -
17 Besi dia 20 mm kg 36.25 - -
18 Cat Jembatan + Pipa m2 49.25 - -
Sub Jumlah VI Rp 0.00

JEMBATAN STA 12+660/17+774

II Jembatan Pipa, Panjang = 9 m' Unit

Uraian pekerjaan per 1 unit bangunan :


1 Galian Tanah berbatu m3 8.36 - -
2 Galian tanah biasa m3 19.50 - -
3 Urugan tanah kembali dipadatkan m3 18.44 - -
4 Urugan Pasir m3 0.70 - -
5 Beton Rabat (Camp 1:3:5) m3 0.70 - -
6 Beton K300 m3 14.54 - -
7 Baja Frofil dengan Pengelasan kg 856.67 - -
8 Plat Andas dan Plat Sambung kg 105.98 - -
9 Pelat buhul / pengaku kg 800.70 - -
10 Stiffener kg 58.71 - -
11 Baja Tulangan kg 2,251.69 - -
12 Begesting Batako kg 7.60 - -
13 Begisting m2 40.71 - -
14 Baut 3/4" bh 160.00 - -
15 Pelat Klem pipa bh 12.00 - -
16 Besi dia 20 mm kg 36.25 - -
17 Cat Jembatan + Pipa m2 38.93 - -
Sub Jumlah VI Rp 0.00

JEMBATAN STA 13+525/18+647

II Jembatan Pipa, Panjang = 9 m' Unit

Uraian pekerjaan per 1 unit bangunan :


1 Galian Tanah berbatu m3 8.30 - -
2 Galian tanah biasa m3 19.38 - -
3 Urugan tanah kembali dipadatkan m3 18.80 - -
4 Urugan Pasir m3 0.70 - -
5 Beton Rabat (Camp 1:3:5) m3 0.70 - -
6 Beton K300 m3 14.54 - -
7 Baja Frofil dengan Pengelasan kg 856.67 - -
8 Plat Andas dan Plat Sambung kg 105.98 - -
9 Pelat buhul / pengaku kg 800.70 - -
10 Stiffener kg 58.71 - -
11 Baja Tulangan kg 2,251.69 - -
12 Begesting Batako kg 7.60 - -
13 Begisting m2 40.71 - -
14 Baut 3/4" bh 160.00 - -
15 Pelat Klem pipa bh 12.00 - -
16 Besi dia 20 mm kg 36.25 - -
17 Cat Jembatan + Pipa m2 38.93 - -
Sub Jumlah VI Rp 0.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
JEMBATAN STA 16+190/21+324

II Jembatan Pipa, Panjang = 9 m' Unit

Uraian pekerjaan per 1 unit bangunan :


1 Galian Tanah berbatu m3 8.30 - -
2 Galian tanah biasa m3 19.36 - -
3 Urugan tanah kembali dipadatkan m3 18.75 - -
4 Urugan Pasir m3 0.70 - -
5 Beton Rabat (Camp 1:3:5) m3 0.70 - -
6 Beton K300 m3 14.54 - -
7 Baja Frofil dengan Pengelasan kg 856.67 - -
8 Plat Andas dan Plat Sambung kg 105.98 - -
9 Pelat buhul / pengaku kg 800.70 - -
10 Stiffener kg 58.71 - -
11 Baja Tulangan kg 2,251.69 - -
12 Begesting Batako kg 7.60 - -
13 Begisting m2 40.71 - -
14 Baut 3/4" bh 160.00 - -
15 Pelat Klem pipa bh 12.00 - -
16 Besi dia 20 mm kg 36.25 - -
17 Cat Jembatan + Pipa m2 38.93 - -
Sub Jumlah VI Rp 0.00

JEMBATAN STA 10+085

II Jembatan Pipa, Panjang = 6 m' Unit

Uraian pekerjaan per 1 unit bangunan :


1 Galian Tanah berbatu m3 11.83 - -
2 Galian tanah biasa m3 27.61 - -
3 Urugan tanah kembali dipadatkan m3 7.72 - -
4 Urugan Pasir m3 0.70 - -
5 Beton Cyclop m3 11.28 - -
6 Beton K225 m3 6.25 - -
7 Beton K300 m3 14.06 - -
8 Baja Frofil dengan Pengelasan kg 573.84 - -
9 Plat Andas dan Plat Sambung kg 105.98 - -
10 Pelat buhul / pengaku kg 822.48 - -
11 Stiffener kg 39.63 - -
12 Baja Tulangan kg 2,830.44 - -
13 Begesting Batako kg 7.60 - -
14 Begisting m2 38.47 - -
15 Baut 3/4" bh 148.00 - -
16 Pelat Klem pipa bh 9.00 - -
17 Besi dia 20 mm kg 36.25 - -
18 Cat Jembatan + Pipa m2 26.60 - -
Sub Jumlah VI Rp 0.00

JEMBATAN STA 10+230

II Jembatan Pipa, Panjang = 6 m' Unit

Uraian pekerjaan per 1 unit bangunan :


1 Galian Tanah berbatu m3 11.83 - -
2 Galian tanah biasa m3 27.61 - -
3 Urugan tanah kembali dipadatkan m3 7.72 - -
4 Urugan Pasir m3 0.70 - -
5 Beton Cyclop m3 11.28 - -
6 Beton K225 m3 6.25 - -
7 Beton K300 m3 14.06 - -
8 Baja Frofil dengan Pengelasan kg 573.84 - -
9 Plat Andas dan Plat Sambung kg 105.98 - -
10 Pelat buhul / pengaku kg 822.48 - -
11 Stiffener kg 39.63 - -
12 Baja Tulangan kg 2,830.44 - -
13 Begesting Batako kg 7.60 - -
14 Begisting m2 38.47 - -
15 Baut 3/4" bh 148.00 - -
16 Pelat Klem pipa bh 9.00 - -
17 Besi dia 20 mm kg 36.25 - -
18 Cat Jembatan + Pipa m2 26.60 - -
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6

Sub Jumlah VI Rp 0.00


HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
JEMBATAN STA 10+615

II Jembatan Pipa, Panjang = 6 m' Unit

Uraian pekerjaan per 1 unit bangunan :


1 Galian Tanah berbatu m3 11.69 - -
2 Galian tanah biasa m3 27.27 - -
3 Urugan tanah kembali dipadatkan m3 7.74 - -
4 Urugan Pasir m3 0.70 - -
5 Beton Cyclop m3 11.28 - -
6 Beton K225 m3 6.25 - -
7 Beton K300 m3 13.11 - -
8 Baja Frofil dengan Pengelasan kg 573.84 - -
9 Plat Andas dan Plat Sambung kg 105.98 - -
10 Pelat buhul / pengaku kg 822.48 - -
11 Stiffener kg 39.63 - -
12 Baja Tulangan kg 2,724.33 - -
13 Begesting Batako kg 7.60 - -
14 Begisting m2 34.06 - -
15 Baut 3/4" bh 148.00 - -
16 Pelat Klem pipa bh 9.00 - -
17 Besi dia 20 mm kg 36.25 - -
18 Cat Jembatan + Pipa m2 26.60 - -
Sub Jumlah VI Rp 0.00

JEMBATAN STA 13+300/18+424

II Jembatan Pipa, Panjang = 6 m' Unit

Uraian pekerjaan per 1 unit bangunan :


1 Galian Tanah berbatu m3 12.44 - -
2 Galian tanah biasa m3 29.04 - -
3 Urugan tanah kembali dipadatkan m3 7.79 - -
4 Urugan Pasir m3 0.70 - -
5 Beton Cyclop m3 11.28 - -
6 Beton K225 m3 6.25 - -
7 Beton K300 m3 13.64 - -
8 Baja Frofil dengan Pengelasan kg 573.84 - -
9 Plat Andas dan Plat Sambung kg 105.98 - -
10 Pelat buhul / pengaku kg 822.48 - -
11 Stiffener kg 39.63 - -
12 Baja Tulangan kg 2,788.44 - -
13 Begesting Batako kg 7.60 - -
14 Begisting m2 36.51 - -
15 Baut 3/4" bh 148.00 - -
16 Pelat Klem pipa bh 9.00 - -
17 Besi dia 20 mm kg 36.25 - -
18 Cat Jembatan + Pipa m2 26.60 - -
Sub Jumlah VI Rp 0.00

JEMBATAN STA 14+280/19+402

II Jembatan Pipa, Panjang = 6 m' Unit

Uraian pekerjaan per 1 unit bangunan :


1 Galian Tanah berbatu m3 13.16 - -
2 Galian tanah biasa m3 30.70 - -
3 Urugan tanah kembali dipadatkan m3 7.47 - -
4 Urugan Pasir m3 0.70 - -
5 Beton Cyclop m3 11.28 - -
6 Beton K225 m3 6.25 - -
7 Beton K300 m3 13.64 - -
8 Baja Frofil dengan Pengelasan kg 573.84 - -
9 Plat Andas dan Plat Sambung kg 105.98 - -
10 Pelat buhul / pengaku kg 822.48 - -
11 Stiffener kg 39.63 - -
12 Baja Tulangan kg 2,788.44 - -
13 Begesting Batako kg 7.60 - -
14 Begisting m2 36.51 - -
15 Baut 3/4" bh 148.00 - -
16 Pelat Klem pipa bh 9.00 - -
17 Besi dia 20 mm kg 36.25 - -
18 Cat Jembatan + Pipa m2 26.60 - -
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6

Sub Jumlah VI Rp 0.00


HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
JEMBATAN STA 14+550/19+674

II Jembatan Pipa, Panjang = 6 m' Unit

Uraian pekerjaan per 1 unit bangunan :


1 Galian Tanah berbatu m3 14.55 - -
2 Galian tanah biasa m3 33.96 - -
3 Urugan tanah kembali dipadatkan m3 7.47 - -
4 Urugan Pasir m3 0.70 - -
5 Beton Cyclop m3 11.28 - -
6 Beton K225 m3 6.25 - -
7 Beton K300 m3 13.64 - -
8 Baja Frofil dengan Pengelasan kg 573.84 - -
9 Plat Andas dan Plat Sambung kg 105.98 - -
10 Pelat buhul / pengaku kg 822.48 - -
11 Stiffener kg 39.63 - -
12 Baja Tulangan kg 2,788.44 - -
13 Begesting Batako kg 7.60 - -
14 Begisting m2 36.51 - -
15 Baut 3/4" bh 148.00 - -
16 Pelat Klem pipa bh 9.00 - -
17 Besi dia 20 mm kg 36.25 - -
18 Cat Jembatan + Pipa m2 26.60 - -
Sub Jumlah VI Rp 0.00

JEMBATAN STA 14+925/20+044

II Jembatan Pipa, Panjang = 6 m' Unit

Uraian pekerjaan per 1 unit bangunan :


1 Galian Tanah berbatu m3 13.38 - -
2 Galian tanah biasa m3 31.22 - -
3 Urugan tanah kembali dipadatkan m3 7.47 - -
4 Urugan Pasir m3 0.70 - -
5 Beton Cyclop m3 11.28 - -
6 Beton K225 m3 6.25 - -
7 Beton K300 m3 13.64 - -
8 Baja Frofil dengan Pengelasan kg 573.84 - -
9 Plat Andas dan Plat Sambung kg 105.98 - -
10 Pelat buhul / pengaku kg 822.48 - -
11 Stiffener kg 39.63 - -
12 Baja Tulangan kg 2,788.44 - -
13 Begesting Batako kg 7.60 - -
14 Begisting m2 36.51 - -
15 Baut 3/4" bh 148.00 - -
16 Pelat Klem pipa bh 9.00 - -
17 Besi dia 20 mm kg 36.25 - -
18 Cat Jembatan + Pipa m2 26.60 - -
Sub Jumlah VI Rp 0.00

JEMBATAN STA 13+900/63+400

II Jembatan Pipa, Panjang = 12,5 m' Unit

Uraian pekerjaan per 1 unit bangunan :


1 Galian Tanah berbatu m3 16.45 - -
2 Galian tanah biasa m3 38.39 - -
3 Urugan tanah kembali dipadatkan m3 20.17 - -
4 Urugan Pasir m3 0.97 - -
5 Beton Rabat (Camp 1 : 3 :5) m3 - - -
6 Beton K300 m3 23.72 - -
7 Baja Frofil dengan Pengelasan kg 1,885.20 - -
8 Plat Andas dan Plat Sambung kg 372.30 - -
9 Pelat buhul / pengaku kg 148.37 - -
10 Stiffener kg 76.93 - -
11 Baja Tulangan kg 3,157.08 - -
12 Begesting Batako kg 11.40 - -
13 Begisting m2 54.73 - -
14 Baut 3/4" bh 324.00 - -
15 Pelat Klem pipa bh 14.00 - -
16 Besi dia 20 mm kg 36.25 - -
17 Cat Jembatan + Pipa m2 71.40 - -
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6

Sub Jumlah VI Rp 0.00


HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
JEMBATAN STA 13+500

II Jembatan Pipa, Panjang = 9 m' Unit

Uraian pekerjaan per 1 unit bangunan :


1 Galian Tanah berbatu m3 15.27 - -
2 Galian tanah biasa m3 35.64 - -
3 Urugan tanah kembali dipadatkan m3 19.20 - -
4 Urugan Pasir m3 0.97 - -
5 Beton Rabat (Camp 1 : 3 :5) m3 - - -
6 Beton K300 m3 23.72 - -
7 Baja Frofil dengan Pengelasan kg 1,356.00 - -
8 Plat Andas dan Plat Sambung kg 395.66 - -
9 Pelat buhul / pengaku kg 105.98 - -
10 Stiffener kg 55.39 - -
11 Baja Tulangan kg 3,157.08 - -
12 Begesting Batako kg 11.40 - -
13 Begisting m2 54.73 - -
14 Baut 3/4" bh 292.00 - -
15 Pelat Klem pipa bh 10.00 - -
16 Besi dia 20 mm kg 36.25 - -
17 Cat Jembatan + Pipa m2 53.42 - -
Sub Jumlah VI Rp 0.00

JEMBATAN STA 13+465

II Jembatan Pipa, Panjang = 9 m' Unit

Uraian pekerjaan per 1 unit bangunan :


1 Galian Tanah berbatu m3 15.23 - -
2 Galian tanah biasa m3 35.54 - -
3 Urugan tanah kembali dipadatkan m3 19.20 - -
4 Urugan Pasir m3 0.97 - -
5 Beton Rabat (Camp 1 : 3 :5) m3 - - -
6 Beton K300 m3 23.72 - -
7 Baja Frofil dengan Pengelasan kg 1,356.00 - -
8 Plat Andas dan Plat Sambung kg 395.66 - -
9 Pelat buhul / pengaku kg 105.98 - -
10 Stiffener kg 55.39 - -
11 Baja Tulangan kg 3,157.08 - -
12 Begesting Batako kg 11.40 - -
13 Begisting m2 54.73 - -
14 Baut 3/4" bh 292.00 - -
15 Pelat Klem pipa bh 10.00 - -
16 Besi dia 20 mm kg 36.25 - -
17 Cat Jembatan + Pipa m2 53.42 - -
Sub Jumlah VI Rp 0.00

JEMBATAN STA 13+365

II Jembatan Pipa, Panjang = 12,5 m' Unit

Uraian pekerjaan per 1 unit bangunan :


1 Galian Tanah berbatu m3 16.47 - -
2 Galian tanah biasa m3 38.44 - -
3 Urugan tanah kembali dipadatkan m3 20.17 - -
4 Urugan Pasir m3 0.97 - -
5 Beton Rabat (Camp 1 : 3 :5) m3 - - -
6 Beton K300 m3 23.72 - -
7 Baja Frofil dengan Pengelasan kg 1,885.20 - -
8 Plat Andas dan Plat Sambung kg 395.66 - -
9 Pelat buhul / pengaku kg 148.37 - -
10 Stiffener kg 76.93 - -
11 Baja Tulangan kg 3,157.08 - -
12 Begesting Batako kg 11.40 - -
13 Begisting m2 54.73 - -
14 Baut 3/4" bh 324.00 - -
15 Pelat Klem pipa bh 14.00 - -
16 Besi dia 20 mm kg 36.25 - -
17 Cat Jembatan + Pipa m2 71.90 - -
Sub Jumlah VI Rp 0.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
JEMBATAN STA 13+200

II Jembatan Pipa, Panjang = 12 m' Unit

Uraian pekerjaan per 1 unit bangunan :


1 Galian Tanah berbatu m3 16.31 - -
2 Galian tanah biasa m3 38.05 - -
3 Urugan tanah kembali dipadatkan m3 20.17 - -
4 Urugan Pasir m3 0.97 - -
5 Beton Rabat (Camp 1 : 3 :5) m3 - - -
6 Beton K300 m3 23.72 - -
7 Baja Frofil dengan Pengelasan kg 1,802.40 - -
8 Plat Andas dan Plat Sambung kg 395.66 - -
9 Pelat buhul / pengaku kg 137.77 - -
10 Stiffener kg 73.85 - -
11 Baja Tulangan kg 3,157.08 - -
12 Begesting Batako kg 11.40 - -
13 Begisting m2 54.73 - -
14 Baut 3/4" bh 320.00 - -
15 Pelat Klem pipa bh 13.00 - -
16 Besi dia 20 mm kg 36.25 - -
17 Cat Jembatan + Pipa m2 68.92 - -
Sub Jumlah VI Rp 0.00

JEMBATAN STA 13+050

II Jembatan Pipa, Panjang = 13 m' Unit

Uraian pekerjaan per 1 unit bangunan :


1 Galian Tanah berbatu m3 16.58 - -
2 Galian tanah biasa m3 38.68 - -
3 Urugan tanah kembali dipadatkan m3 20.17 - -
4 Urugan Pasir m3 0.97 - -
5 Beton Rabat (Camp 1 : 3 :5) m3 - - -
6 Beton K300 m3 23.72 - -
7 Baja Frofil dengan Pengelasan kg 1,951.20 - -
8 Plat Andas dan Plat Sambung kg 395.66 - -
9 Pelat buhul / pengaku kg 148.37 - -
10 Stiffener kg 80.01 - -
11 Baja Tulangan kg 3,157.08 - -
12 Begesting Batako kg 11.40 - -
13 Begisting m2 54.73 - -
14 Baut 3/4" bh 468.00 - -
15 Pelat Klem pipa bh 14.00 - -
16 Besi dia 20 mm kg 36.25 - -
17 Cat Jembatan + Pipa m2 74.08 - -
Sub Jumlah VI Rp 0.00

JEMBATAN STA 12+900

II Jembatan Pipa, Panjang = 16,5 m' Unit

Uraian pekerjaan per 1 unit bangunan :


1 Galian Tanah berbatu m3 16.41 - -
2 Galian tanah biasa m3 38.29 - -
3 Urugan tanah kembali dipadatkan m3 20.17 - -
4 Urugan Pasir m3 0.97 - -
5 Beton Rabat (Camp 1 : 3 :5) m3 - - -
6 Beton K300 m3 23.72 - -
7 Baja Frofil dengan Pengelasan kg 2,480.40 - -
8 Plat Andas dan Plat Sambung kg 395.66 - -
9 Pelat buhul / pengaku kg 190.76 - -
10 Stiffener kg 101.55 - -
11 Baja Tulangan kg 3,157.08 - -
12 Begesting Batako kg 11.40 - -
13 Begisting m2 54.73 - -
14 Baut 3/4" bh 484.00 - -
15 Pelat Klem pipa bh 18.00 - -
16 Besi dia 20 mm kg 36.25 - -
17 Cat Jembatan + Pipa m2 92.56 - -
Sub Jumlah VI Rp 0.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
JEMBATAN STA 12+565

II Jembatan Pipa, Panjang = 12 m' Unit

Uraian pekerjaan per 1 unit bangunan :


1 Galian Tanah berbatu m3 16.31 - -
2 Galian tanah biasa m3 38.05 - -
3 Urugan tanah kembali dipadatkan m3 20.17 - -
4 Urugan Pasir m3 0.97 - -
5 Beton Rabat (Camp 1 : 3 :5) m3 - - -
6 Beton K300 m3 23.72 - -
7 Baja Frofil dengan Pengelasan kg 1,802.40 - -
8 Plat Andas dan Plat Sambung kg 395.66 - -
9 Pelat buhul / pengaku kg 137.77 - -
10 Stiffener kg 73.85 - -
11 Baja Tulangan kg 3,157.08 - -
12 Begesting Batako kg 11.40 - -
13 Begisting m2 54.73 - -
14 Baut 3/4" bh 320.00 - -
15 Pelat Klem pipa bh 13.00 - -
16 Besi dia 20 mm kg 36.25 - -
17 Cat Jembatan + Pipa m2 68.92 - -
Sub Jumlah VI Rp 0.00

JEMBATAN STA 12+495

II Jembatan Pipa, Panjang = 12 m' Unit

Uraian pekerjaan per 1 unit bangunan :


1 Galian Tanah berbatu m3 16.31 - -
2 Galian tanah biasa m3 38.05 - -
3 Urugan tanah kembali dipadatkan m3 20.17 - -
4 Urugan Pasir m3 0.97 - -
5 Beton Rabat (Camp 1 : 3 :5) m3 - - -
6 Beton K300 m3 23.72 - -
7 Baja Frofil dengan Pengelasan kg 1,802.40 - -
8 Plat Andas dan Plat Sambung kg 395.66 - -
9 Pelat buhul / pengaku kg 137.77 - -
10 Stiffener kg 73.85 - -
11 Baja Tulangan kg 3,157.08 - -
12 Begesting Batako kg 11.40 - -
13 Begisting m2 54.73 - -
14 Baut 3/4" bh 320.00 - -
15 Pelat Klem pipa bh 13.00 - -
16 Besi dia 20 mm kg 36.25 - -
17 Cat Jembatan + Pipa m2 68.92 - -
Sub Jumlah VI Rp 0.00

JEMBATAN STA 11+975

II Jembatan Pipa, Panjang = 12,5 m' Unit

Uraian pekerjaan per 1 unit bangunan :


1 Galian Tanah berbatu m3 16.47 - -
2 Galian tanah biasa m3 38.42 - -
3 Urugan tanah kembali dipadatkan m3 20.17 - -
4 Urugan Pasir m3 0.97 - -
5 Beton Cyclop m3 - - -
6 Beton K300 m3 23.72 - -
7 Baja Frofil dengan Pengelasan kg 1,885.20 - -
8 Plat Andas dan Plat Sambung kg 395.66 - -
9 Pelat buhul / pengaku kg 148.37 - -
10 Stiffener kg 76.93 - -
11 Baja Tulangan kg 3,157.08 - -
12 Begesting Batako kg 11.40 - -
13 Begisting m2 54.73 - -
14 Baut 3/4" bh 324.00 - -
15 Pelat Klem pipa bh 14.00 - -
16 Besi dia 20 mm kg 36.25 - -
17 Cat Jembatan + Pipa m2 71.90 - -
Sub Jumlah VI Rp 0.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
JEMBATAN STA 11+560/16+374

II Jembatan Pipa, Panjang = 18 m' Unit

Uraian pekerjaan per 1 unit bangunan :


1 Galian Tanah berbatu m3 14.52 - -
2 Galian tanah biasa m3 33.89 - -
3 Urugan tanah kembali dipadatkan m3 20.17 - -
4 Urugan Pasir m3 0.97 - -
5 Beton Cyclop m3 - - -
6 Beton K225 m3 - - -
7 Beton K300 m3 23.72 - -
8 Baja Frofil dengan Pengelasan kg 2,695.20 - -
9 Plat Andas dan Plat Sambung kg 395.66 - -
10 Pelat buhul / pengaku kg 201.35 - -
11 Stiffener kg 110.78 - -
12 Baja Tulangan kg 3,157.08 - -
13 Begesting Batako kg 11.40 - -
14 Begisting m2 54.73 - -
15 Baut 3/4" bh 488.00 - -
16 Pelat Klem pipa bh 19.00 - -
17 Besi dia 20 mm kg 36.25 - -
18 Cat Jembatan + Pipa m2 99.91 - -
Sub Jumlah VI Rp 0.00

JEMBATAN STA 9+200

II Jembatan Pipa, Panjang = 28 m' Unit

Uraian pekerjaan per 1 unit bangunan :


1 Galian Tanah berbatu m3 14.59 - -
2 Galian tanah biasa m3 34.05 - -
3 Urugan tanah kembali dipadatkan m3 28.73 - -
4 Urugan Pasir m3 0.97 - -
5 Beton Cyclop m3 - - -
6 Beton K225 m3 - - -
7 Beton K300 m3 42.51 - -
8 Baja Frofil dengan Pengelasan kg 5,414.52 - -
9 Plat Andas dan Plat Sambung kg 728.63 - -
10 Pelat buhul / pengaku kg 85.37 - -
11 Stiffener kg 277.25 - -
12 Baja Tulangan kg 4,220.02 - -
13 Begesting Batako kg 11.40 - -
14 Begisting m2 108.67 - -
15 Baut 3/4" bh 812.00 - -
16 Pelat Klem pipa bh 29.00 - -
17 Besi dia 20 mm kg 36.15 - -
18 Cat Jembatan + Pipa m2 156.95 - -
Sub Jumlah VI Rp 0.00

PEMBANGUNAN JEMBATAN PIPA L = 60 m -

Pekerjaan Tanah :
Galian Tanah berbatu m³ 96.21 - -
Galian tanah biasa m³ 24.50 - -
Urugan tanah dipadatkan m³ 100.00 - -

Pekerjaan Pasangan :
Pasangan Batu Kali 1:4 m³ 325.00 - -

Pekerjaan Beton :
Beton Cyclop m³ 24.52 - -
Beton Cor K225 m³ 61.30 - -

Baja Frofil dengan Pengelasan


Baja Frofil dengan Pengelasan kg 18,684.44 - -
Pelat baja dan pengaku kg 5,405.35 - -

Pembesian :
Baja Tulangan kg 5,486.53 - -
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6

Begisting :
Begisting m² 328.49 - -

Lain Lain :
Baut 3/4" bh 6,172.00 - -
Baut 1" bh 1,512.00 - -
Angker 1" bh 18.00 - -
Elastoner bh 2.00 - -
Pelat Klem pipa bh 48.00 - -
Kayu kamper 6/12 m³ 0.40 - -
Cat Jembatan + Pipa m² 764.64 - -
Jumlah -
PEKERJAAN LAIN LAIN
Pasangan Batu Kali Camp. 1smn : 4 psr m³ 1,500.00 - -
Beton Camp. 1smn : 3 psr : 5 krl m³ 500.00 - -
Beton Camp. 1smn : 11/2 psr : 2 1/2 krl /Trush Block m3 51.52 - -
Begesting 2x Pakai Trush Block m2 228.96 - -
Pembesian Trush Block kg 5,189.66 - -
Pembuatan dan Pemasangan Pelindung Air valve Bh #NAME? 150,000.00 #NAME?
Pembuatan dan Pemasangan Beton KS Bh #NAME? 125,000.00 #NAME?
Pembuatan dan Pemasangan patok Ujung pipa Bh 50.00 100,000.00 5,000,000.00
Pembersihan Akhir Ls 1.00 20,000,000.00 20,000,000.00
Sub Jumlah VII Rp #NAME?
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6

BANGUNAN RESERVOIR PEJARAKAN Err:509


Err:509
A BANGUNAN RESERVOIR KAPASITAS 400 M3
1 PEKERJAAN TANAH
1 Pengukuran dan Pasang Bowplank m' 66.50 - -
2 Galian Tanah dengan excavator m3 317.06 - -
3 Urugan Tanah Kembali dengan Pemadatan m3 64.01 - -
4 Urugan Pasir t = 10 cm m3 16.44 - -
Jumlah -
2 PEKERJAAN STRUKTUR ATAU SIPIL DAN ASITEKTUR
a Pekerjaan Beton
2 Lantai Kerja K - 125 (1 PC : 3 PS : 5KR)
- Cor Beton Camp 1:3:5 m3 16.44 - -
4 Pekerjaan Sloof
- Beton Cor K-300 m3 6.41 - -
- Pekerjaan Besi Beton Kg 1,640.97 - -
- Begesting Pasangan Batako m2 56.60 - -
5 Pekerjaan Beton Lantai
- Beton Cor K-300 m3 52.31 - -
- besi Beton Kg 6,068.76 - -
6 Pekerjaan Beton Kolom
- Beton Cor K-300 m3 6.41 - -
- besi Beton Kg 1,616.28 - -
- Begesting 2 X pakai m2 111.32 - -
7 Pekerjaan Beton Dinding
- Beton Cor K-300 m3 47.87 - -
- besi Beton Kg 5,624.93 - -
- Begesting 2 X pakai m2 478.72 - -
- Pekerjaan Tie Rod pada Bekisting Vertikal m1 375.00 - -
9 Pekerjaan Beton Balok
- Beton Cor K-300 m3 6.00 - -
- besi Beton Kg 1,590.41 - -
- Begesting 2 X pakai m2 83.93 - -
###Pekerjaan Beton Plat Atap
- Beton Cor K-300 m3 16.23 - -
- besi Beton Kg 2,992.03 - -
- Begesting m2 162.33 - -
Jumlah -

b Pekerjaan Pasangan dan Pelapis


###Pekerjaan Pas, Dinding Bata Merah m2 80.85 - -
###Pekerjaan Water Proofing m2 772.62 - -
###Pekerjaan Water Stop m 106.50 - -
###Pekerjaan Plesteran 1 PC : 2 Ps m2 809.92 - -
###Pekerjaan Acian m2 37.29 - -
Jumlah -

c Pekerjaan Kusen Pintu dan Relling


###Pekerjaan Pipa Ventilasi GIP 4" Unit 4.00 750,000.00 3,000,000.00
###Pekerjaan Penutup Man Hole Plat Besi T= 1.2 mm Unit 5.00 Err:509 Err:509
###Pekerjaan Tangga Inspeksi Pipa GIP Unit 4.00 Err:509 Err:509
Pekerjaan Tangga Besi Kg 194.60 - -
Jumlah Err:509
3 PEKERJAAN PIPA DAN ACCESSORIES
Pengadaan
Pipa In Flow Baja Three layer Polythylene dia.OD 406,4 mm, tebal dinding m 52.80 - -
Pipa Over Flow dan Penguras Pipa Baja Three layer Polythylene dia.OD 406, m 58.14 - -
Pipa Out Flow Pipa Baja Three layer Polythylene dia.OD 406,4 mm, tebal di m 55.02 - -
Bend 90° Three Layer Polythelene dia OD 406,4 mm, tebal dinding 5,56 mm bh 7.00 - -
Tee OD 406,4 x 406,4 bh 1.00 Err:509 Err:509
Strainer Y OD Ø 273,05 bh 1.00 Err:509 Err:509
AF Gate Valve PN 16 dia. 16'' bh 3.00 Err:509 Err:509
Dismantling Joint dia. 16'' bh 3.00 - -
Watermeter dia. 16'' bh 1.00 Err:509 Err:509
End Cap dia 16'' bh 1.00 - -
Saringan dia. 16'' bh 1.00 2,700,000.00 2,700,000.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
Pemasangan
Pipa In Flow Baja Three layer Polythylene dia.OD 406,4 mm, tebal dinding m 52.80 - -
Pipa Over Flow dan Penguras Pipa Baja Three layer Polythylene dia.OD 406, m 58.14 - -
Pipa Out Flow Pipa Baja Three layer Polythylene dia.OD 406,4 mm, tebal di m 55.02 - -
Bend 90° Three Layer Polythelene dia OD 406,4 mm, tebal dinding 5,56 mm bh 7.00 90,000.00 630,000.00
Tee OD 406,4 x 406,4 bh 1.00 90,000.00 90,000.00
Strainer Y OD Ø 273,05 bh 1.00 90,000.00 90,000.00
AF Gate Valve PN 16 dia. 16'' bh 3.00 90,000.00 270,000.00
Dismantling Joint dia. 16'' bh 3.00 90,000.00 270,000.00
Watermeter dia. 16'' bh 1.00 90,000.00 90,000.00
End Cap dia 16'' bh 1.00 90,000.00 90,000.00
Saringan dia. 16'' bh 1.00 90,000.00 90,000.00
Jumlah Err:509

9,394,638.00
B POS JAGA
1 PEKERJAAN TANAH
1 Pengukuran dan Pasang Bowplank m' 32.40 - -
2 Galian Tanah dengan excavator m3 23.35 - -
3 Urugan Tanah Kembali dengan Pemadatan m3 10.48 - -
4 Urugan Pasir t = 10 cm m3 1.13 - -
1 Pek. Urugan Tanah Peninggian Lantai m3 1.50 - -
2 Pek. Urugan Pasir Lantai Kerja m3 1.07 - -
Jumlah -
2 PEKERJAAN STRUKTUR ATAU SIPIL DAN ASITEKTUR
a Pekerjaan Beton
2 Lantai Kerja K - 125 (1 PC : 3 PS : 5KR)
- Cor Beton Camp 1:3:5 m3 1.07 - -
4 Pekerjaan Sloof
- Beton Cor K-300 m3 1.44 - -
- Pekerjaan Besi Beton Kg 163.30 - -
- Begesting Pasangan Batako m2 14.35 - -
6 Pekerjaan Beton Kolom
- Beton Cor K-300 m3 0.96 - -
- besi Beton Kg 193.49 - -
- Begesting 2 X pakai m2 25.51 - -
9 Pekerjaan Beton Balok
- Beton Cor K-300 m3 1.57 - -
- besi Beton Kg 273.81 - -
- Begesting 2 X pakai m2 29.94 - -
9 Pekerjaan Beton Plat Atap
- Beton Cor K-300 m3 1.79 - -
- besi Beton Kg 419.47 - -
- Begesting 1 X pakai m2 14.88 - -
9 Pekerjaan Beton Lisplank
- Beton Cor K-300 m3 0.61 - -
- besi Beton Kg 249.26 - -
- Begesting 2 X pakai m2 13.76 - -
9 Pekerjaan Meja Beton
- Beton Cor K-300 m3 0.10 - -
- besi Beton Kg 25.69 - -
- Begesting 2 X pakai m2 1.95 - -
Jumlah -

b Pekerjaan Pasangan dan Pelapis


Pekerjaan Pasangan Batu Kosong m3 3.40 - -
Pekerjaan Pasangan Batu Kali Camp 1 : 5 m3 9.04 - -
###Pekerjaan Pasangan Bata Camp 1:5 m2 99.88 - -
Pekerjaan Trasram m2 13.68 - -
###Pekerjaan Plesteran 1 PC : 5 PS m2 199.76 - -
###Pekerjaan Acian m2 199.76 - -
Pekerjaan Cat Dinding m2 199.76 - -
1 Pek. Pas. Batu Alam Random m2 13.76 - -
2 Pek. Tempelan Batu Candi m2 30.83 - -
Jumlah -
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
c Pekerjaan Atap
###Pekerjaan Rangka Kuda-Kuda Atap m3 0.46 - -
###Pekerjaan Usuk dan Reng m2 53.04 - -
###Pekerjaan Pasangan Atap Genteng m2 18.71 - -
Pekerjaan Pas Bubungan m' 22.15 - -
Pekerjaan Pas. Ikut Celedu unit 4.00 - -
Pekerjaan Pas. Murda unit 2.00 - -
Pekerjaan Pas. Listplank m' 19.40 - -
Pekerjaan Pas. Tatab m' 19.72 - -
Pek. Cat Listplank m2 9.70 - -
Jumlah -
d Pekerjaan Langit-Langit
###Pas. Plafond Kasiboard Rangka Hollow m3 21.37 - -
###Pas. List Gypsum m' 37.60 - -
###Pek. Cat Plafond m2 21.37 - -
Jumlah -
e Pekerjaan Penutup Lantai
###Pas.Keramik 30 x 30 cm m2 20.68 - -
###Pas. Keramik 20x30 cm m2 2.25 - -
Pas. Keramik Dinding m2 12.60 - -
###Pas. Stepnozing m' 6.00 - -
Jumlah -
f Pekerjaan Kusen Pintu dan Jendela
###Pas. Kusen Kayu Kamper m3 0.23 - -
###Pas. Daun Pintu Kayu Kamper m2 5.19 - -
###Pas. Jendela Kaca m2 1.76 - -
Pas. Kaca Bening t = 5 mm m2 0.78 - -
###Pas. Engsel Pintu set 6.00 - -
Pas. Grendel Pintu unit 2.00 - -
###Pas. Handle & Kunci Pintu m' 2.00 - -
Pas. Engsel Jendela unit 8.00 - -
Pas. Grendel Jendela unit 4.00 - -
Pas. Kait Angin unit 8.00 - -
Pek. Polituran m2 28.50 - -
Jumlah -
g Pekerjaan Toilet
1 Instalasi Plumbing Air Bersih m 25.00 42,900.00 1,072,500.00
2 Instalasi Plumbing Air Kotor m 36.00 231,170.50 8,322,138.00
3 Closet duduk bh 1.00 - -
4 Pasang Washtafel set 1.00 - -
5 Pasang Floor Drain set 1.00 - -
6 Pasang Kran air set 2.00 - -
Pekerjaan Septiktank unit 1.00 - -
Pekerjaan Peresapan unit 1.00 - -
Jumlah 9,394,638.00
-
C PAGAR
Pengukuran dan Pasang Bowplank m' 74.28 - -
Galian Tanah dengan excavator m3 18.94 - -
Urugan Tanah Kembali dengan Pemadatan m3 19.61 - -
Urugan Pasir t = 10 cm m3 1.11 - -
Pekerjaan Pasangan Batu Kosong m3 3.34 - -
Pekerjaan Pasangan Batu Kali Camp 1 : 5 m3 12.26 - -
Pekerjaan Sloof
- Beton Cor K-300 m3 3.72 - -
- Pekerjaan Besi Beton Kg 412.39 - -
- Begesting 2 X pakai m2 37.19 - -
Pekerjaan Beton Kolom
- Beton Cor K-300 m3 3.72 - -
- besi Beton Kg 412.39 - -
- Begesting 2 X pakai m2 37.19 - -
Pekerjaan Beton Balok
- Beton Cor K-300 m3 1.37 - -
- besi Beton Kg 240.84 - -
- Begesting 2 X pakai m2 36.48 - -
###Pekerjaan Pasangan Bata Camp 1:5 m2 103.99 - -
###Pekerjaan Plesteran 1 PC : 5 PS m2 345.40 - -
###Pekerjaan Acian m2 345.40 - -
Pekerjaan Paving t=8 mm, K225 m2 160.69 - -
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
Jumlah -
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6

D PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 1,146,216,882.90

a Pengadaan mekanikal dan aksesoris


Perpipaan Inlet
- Ø 400 mm Steel pipe SCH.40 m 22.00 5,461,532.98 120,153,725.52
- Ø 400 mm Flange las unit 4.00 3,403,532.00 13,614,128.00
- Ø 400 mm x 90 Steel Bend fl - fl unit 4.00 7,382,628.00 29,530,512.00
- Ø 400 mm x 0,60 m' Double fl - fl ( Wall pipa ) unit 1.00 7,814,400.00 7,814,400.00
- Ø 400 mm Karet Packing unit 7.00 73,645.00 515,515.00
- M30 Baut mur set 64.00 51,036.70 3,266,348.80
Perpipaan Outlet
- Ø 350 mm x 0,60 m' Double fl - fl ( Wall pipa ) unit 2.00 6,215,638.00 12,431,276.00
- Ø 350 mm Steel pipe SCH.40 m' 2.00 3,363,656.73 6,727,313.45
- Ø 350 mm DI Gate Valve metal resilient Seated all flange unit 1.00 29,960,409.60 29,960,409.60
- Ø 350 mm Dismantling Joint/Adaptor unit 1.00 3,535,294.40 3,535,294.40
- Ø 350 mm Water meter unit 1.00 6,548,850.00 6,548,850.00
- Ø 350 mm Strainer unit 1.00 7,318,080.00 7,318,080.00
- Ø 350 mm Saringan unit 1.00 4,621,848.00 4,621,848.00
- Ø 350 mm x 90 Steel Bend fl - fl unit 1.00 1,872,200.00 1,872,200.00
- Ø 350 mm Flange las unit 12.00 4,040,278.00 48,483,336.00
- Ø 350 mm Karet Packing unit 13.00 62,315.00 810,095.00
- M24 Baut mur set 192.00 44,187.00 8,483,904.00
Perpipaan Drain dan Overflow
- Ø 400 mm x 0,60 m' Double fl - fl ( Wall pipa ) unit 1.00 7,814,400.00 7,814,400.00
- Ø 350 mm x 0,60 m' Double fl - fl ( Wall pipa ) unit 2.00 6,215,638.00 12,431,276.00
- Ø 400 mm Steel pipe SCH.40 m' 4.00 5,461,532.98 21,846,131.91
- Ø 350 mm Steel pipe SCH.40 m' 3.00 3,363,656.73 10,090,970.18
- Ø 350 mm DI Gate Valve metal resilient Seated all flange unit 1.00 29,960,409.60 29,960,409.60
- Ø 350 mm Dismantling Joint/Adaptor unit 1.00 3,535,294.40 3,535,294.40
- Ø 400 mm x Ø 350 mm Tee steel unit 1.00 6,070,704.64 6,070,704.64
- Ø 400 mm x 90 Steel Bend fl - fl unit 2.00 7,382,628.00 14,765,256.00
- Ø 350 mm x 90 Steel Bend fl - fl unit 1.00 1,872,200.00 1,872,200.00
- Ø 400 mm Flange las unit 10.00 3,403,532.00 34,035,320.00
- Ø 350 mm Flange las unit 5.00 4,040,278.00 20,201,390.00
- Ø 400 mm Karet Packing unit 10.00 73,645.00 736,450.00
- Ø 350 mm Karet Packing unit 5.00 62,315.00 311,575.00
- M24 Baut mur set 80.00 44,187.00 3,534,960.00
- M30 Baut mur set 160.00 51,036.70 8,165,872.00
- Manhole plat besi T=1.2 MM unit 3.00 1,706,292.50 5,118,877.50
- Pipa Vent unit 3.00 286,000.00 858,000.00
- Ø 50 mm pipa Drainase PVC m 2.00 101,062.50 202,125.00
Jumlah 487,238,447.99

b Pemasangan mekanikal dan aksesoris


Perpipaan Inlet
- Ø 400 mm Steel pipe SCH.40 m 22.00 22,988.58 505,748.78
- Ø 400 mm Flange las unit 4.00 680,927.50 2,723,710.00
- Ø 400 mm x 90 Steel Bend fl - fl unit 4.00 101,640.00 406,560.00
- Ø 400 mm x 0,60 m' Double fl - fl ( Wall pipa ) unit 1.00 139,975.00 139,975.00
- Ø 400 mm Karet Packing unit 7.00 1,561.66 10,931.59
- M30 Baut mur set 64.00 892.38 57,112.00
Perpipaan Outlet
- Ø 350 mm x 0,60 m' Double fl - fl ( Wall pipa ) unit 2.00 129,910.00 259,820.00
- Ø 350 mm Steel pipe SCH.40 m' 2.00 21,896.31 43,792.63
- Ø 350 mm DI Gate Valve metal resilient Seated all flange unit 1.00 215,176.50 215,176.50
- Ø 350 mm Dismantling Joint/Adaptor unit 1.00 215,176.50 215,176.50
- Ø 350 mm Water meter unit 1.00 129,827.50 129,827.50
- Ø 350 mm Strainer unit 1.00 129,827.50 129,827.50
- Ø 350 mm Saringan unit 1.00 86,102.50 86,102.50
- Ø 350 mm x 90 Steel Bend fl - fl unit 1.00 99,253.00 99,253.00
- Ø 350 mm Flange las unit 12.00 521,723.13 6,260,677.50
- Ø 350 mm Karet Packing unit 13.00 1,561.66 20,301.53
- M24 Baut mur set 192.00 892.38 171,336.00
Perpipaan Drain dan Overflow
- Ø 400 mm x 0,60 m' Double fl - fl ( Wall pipa ) unit 1.00 139,975.00 139,975.00
- Ø 350 mm x 0,60 m' Double fl - fl ( Wall pipa ) unit 2.00 129,910.00 259,820.00
- Ø 400 mm Steel pipe SCH.40 m' 4.00 22,988.58 91,954.32
- Ø 350 mm Steel pipe SCH.40 m' 3.00 21,896.31 65,688.94
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Ø 350 mm DI Gate Valve metal resilient Seated all flange unit 1.00 215,176.50 215,176.50
- Ø 350 mm Dismantling Joint/Adaptor unit 1.00 215,176.50 215,176.50
- Ø 400 mm x Ø 350 mm Tee steel unit 1.00 226,336.00 226,336.00
- Ø 400 mm x 90 Steel Bend fl - fl unit 2.00 101,640.00 203,280.00
- Ø 350 mm x 90 Steel Bend fl - fl unit 1.00 198,319.00 198,319.00
- Ø 400 mm Flange las unit 10.00 680,927.50 6,809,275.00
- Ø 350 mm Flange las unit 5.00 521,723.13 2,608,615.63
- Ø 400 mm Karet Packing unit 10.00 1,561.66 15,616.56
- Ø 350 mm Karet Packing unit 5.00 1,561.66 7,808.28
- M24 Baut mur set 80.00 892.38 71,390.00
- M30 Baut mur set 160.00 892.38 142,780.00
- Manhole plat besi T=1.2 MM unit 3.00 93,749.59 281,248.77
- Pipa Vent unit 3.00 44,187.00 132,561.00
- Ø 50 mm pipa Drainase PVC m 2.00 44,187.00 88,374.00
Jumlah 23,248,724.04
c Pengadaan Elektrikal dan Accesories
Panel Penerangan Pos Jaga (PP-PJ)
- Box Plastic mini pragma pintu tranparant, inbow, 12 modul Unit 1.00 186,780.00 186,780.00
- MCB 3P/16A 10 KA unit 1.00 190,129.50 190,129.50
- RCCB/ELCB, 4P, 25A, Sensitifitas : 30 mA unit 1.00 568,551.50 568,551.50
- MCB 1P/6A 6 KA unit 4.00 40,414.00 161,656.00
- MCB 1P/10A 6 KA unit 1.00 40,414.00 40,414.00
- Box plastic mini pragma pintu transparant, inbow, 12 modul unit 1.00 308,000.00 308,000.00
- MCB 1P/16A 6 KA unit 1.00 200,200.00 200,200.00
- RCCB/ELCB, 2P, 16A, Sensitifitas : 30 mA unit 1.00 1,074,150.00 1,074,150.00
- MCB 1P/4A 6 KA unit 6.00 161,700.00 970,200.00
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 807,660.48 807,660.48
Penerangan Ruang Pos Jaga
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 396,000.00 396,000.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 528,000.00 528,000.00
- Single switch 10 A/ 220V plano unit 6.00 18,700.00 112,200.00
- Double Switch 10 A/ 220V plano unit 2.00 23,100.00 46,200.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 4.00 253,605.40 1,014,421.58
- Kabel NYM 3 x 2,5 mm2 m 80.00 14,300.00 1,144,000.00
- uPVC Conduit 20 m m 70.00 8,635.00 604,450.00
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
- Lampu TL 2 X 18W/WP unit 9.00 65,450.00 589,050.00
- Lampu jalan 50 W /SINGEL unit 12.00 513,128.00 6,157,536.00
- Outlet 10 A/2P+E 220V unit 6.00 170,940.00 1,025,640.00
- Single switch 10 A/ 220V plano unit 6.00 18,700.00 112,200.00
- Kabel dari P. Penerangan ke PJU
- - NYFGBY 3 x 2,5 mm2 meter 280.00 43,274.00 12,116,720.00
- Kabel dari P. Penerangan ke Lampu Taman
- - NYFGBY 3 x 2,5 mm2 meter 130.00 43,274.00 5,625,620.00
- Kabel dari P. Penerangan ke lampu stop kontak Penguras
- - NYFGBY 3 x 2,5 mm2 meter 90.00 43,274.00 3,894,660.00
- Junction Box untuk kabel NYFGBY ke NYM unit 1.00 1,099,560.00 1,099,560.00
- Instalasi titik lampu titik 15.00 589,050.00 8,835,750.00
- Instalasi titik lampu jalan titik 12.00 589,050.00 7,068,600.00
- Instalasi stop kontak titik 6.00 392,700.00 2,356,200.00
Jumlah 57,269,749.06
d Pemasangan Elektrikal dan Accesories
Panel Penerangan Pos Jaga (PP-PJ)
- Perakitan dan Pemasangan lengkap termasuk aksesoris set 1.00 807,660.48 807,660.48
Penerangan Ruang Pos Jaga
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 4.00 24,200.00 96,800.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 24,200.00 -
- Titik Lampu titik 2.00 72,689.44 145,378.88
Penyambungan Listrik PLN
- Uang Jaminan Pelanggan VA 4,400.00 272.25 1,197,900.00
- Biaya penyambungan VA 4,400.00 555.50 2,444,200.00
- Biaya installatir termasuk Sertifikasi Laik Operasi VA 4,400.00 145.20 638,880.00
- Biaya konstruksi dan peralatan penunjang LS 1.00 226,671,423.94 226,671,423.94
Jumlah 232,082,983.30

e Pengadaan Elektrikal dan Accesories


HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
Panel Penerangan Pos Jaga (PP-PJ)
- Box Plastic mini pragma pintu tranparant, inbow, 12 modul Unit 1.00 186,780.00 186,780.00
- MCB 3P/16A 10 KA unit 1.00 190,129.50 190,129.50
- RCCB/ELCB, 4P, 25A, Sensitifitas : 30 mA unit 1.00 568,551.50 568,551.50
- MCB 1P/6A 6 KA unit 4.00 40,414.00 161,656.00
- MCB 1P/10A 6 KA unit 1.00 40,414.00 40,414.00
Penerangan Toilet
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 396,000.00 396,000.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 528,000.00 528,000.00
- Single switch 10 A/ 220V plano unit 8.00 18,700.00 149,600.00
- Double Switch 10 A/ 220V plano unit 2.00 23,100.00 46,200.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 6.00 253,605.40 1,521,632.38
- Kabel NYM 3 x 2,5 mm2 m 200.00 14,300.00 2,860,000.00
- uPVC Conduit 20 m m 75.00 8,635.00 647,625.00
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
Penerangan Ruang Pos Jaga
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 396,000.00 396,000.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 528,000.00 528,000.00
- Single switch 10 A/ 220V plano unit 6.00 18,700.00 112,200.00
- Double Switch 10 A/ 220V plano unit 2.00 23,100.00 46,200.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 4.00 253,605.40 1,014,421.58
- Kabel NYM 3 x 2,5 mm2 m 80.00 14,300.00 1,144,000.00
- uPVC Conduit 20 m m 70.00 8,635.00 604,450.00
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
- Panel Lokal Valve Sedimentasi 0
- Penangkal Petir type Elctrode dengan Rmin = 60m LS 1.00 10,822,650.43 10,822,650.43
- Grounding Anchor Rot 4 meter (3/4) unit 5.00 770,000.00 3,850,000.00
- - NYA 50 mm2 meter 10.00 150,150.00 1,501,500.00
- Clamp Anchor Rot 50 mm2 unit 2.00 16,940.00 33,880.00
- Air terminal Ø 1, termasuk dudukan, komplit set 1.00 686,511.41 686,511.41
- GIP Ø 3 unit 1.00 1,811,040.00 1,811,040.00
- GIP Ø 2 unit 1.00 123,200.00 123,200.00
- Box control 30x30x70 cm unit 1.00 848,043.50 848,043.50
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 807,660.48 807,660.48
- Pengesahan Depnaker LS 1.00 4,620,000.00 4,620,000.00
Jumlah 36,316,745.78

f Pemasangan Elektrikal dan Accesories


Panel Penerangan Pos Jaga (PP-PJ)
- Perakitan dan Pemasangan lengkap termasuk aksesoris set 1.00 807,660.48 807,660.48
- Penerangan Toilet
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 6.00 24,200.00 145,200.00
- Titik Lampu titik 2.00 72,689.44 145,378.88
Penerangan Ruang Pos Jaga
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 4.00 24,200.00 96,800.00
- Titik Lampu titik 2.00 72,689.44 145,378.88
Jumlah 1,501,898.24
g Pengadaan Lampu penerangan luar
Dari panel PP-LR1
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 2,464,000.00 41,888,000.00
- Tiang lampu hot dip galvanis 6 m set 17.00 2,200,000.00 37,400,000.00
- Kabel NYFGbY 3 x 4 mm2 m 15.00 26,950.00 404,250.00
- Kabel NYFGbY 3 x 2,5 mm2 m 185.00 18,700.00 3,459,500.00
- Kabel NYFGbY 2 x 2,5 mm2 m 100.00 15,950.00 1,595,000.00
- GIP 2" m 6.00 123,200.00 739,200.00
Dari panel PP-LR2
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 2,464,000.00 41,888,000.00
- Tiang lampu hot dip galvanis 6 m set 17.00 2,200,000.00 37,400,000.00
- Kabel NYFGbY 4 x 4 mm2 m 30.00 31,900.00 957,000.00
- Kabel NYFGbY 3 x 4 mm2 m 50.00 26,950.00 1,347,500.00
- Kabel NYFGbY 3 x 2,5 mm2 m 50.00 18,700.00 935,000.00
- Kabel NYFGbY 4 x 2,5 mm2 m 60.00 22,000.00 1,320,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 40.00 15,950.00 638,000.00
Dari panel PP-LR3
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 2,464,000.00 41,888,000.00
- Kabel NYFGbY 3 x 2,5 mm2 m 150.00 18,700.00 2,805,000.00
- Kabel NYFGbY 4 x 4 mm2 m 50.00 31,900.00 1,595,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 220.00 15,950.00 3,509,000.00
- 5. GIP 2" m 6.00 123,200.00 739,200.00
- Tiang lampu hot dip galvanis 6 m set 8.00 2,200,000.00 17,600,000.00
Jumlah 238,107,650.00
h Pemasangan Lampu penerangan luar
Dari panel PP-LR1
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 807,660.48 13,730,228.16
- Kabel NYFGbY 3 x 4 mm2 m 15.00 30,800.00 462,000.00
- Kabel NYFGbY 3 x 2,5 mm2 m 185.00 30,800.00 5,698,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 100.00 30,800.00 3,080,000.00
Dari panel PP-LR2
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 807,660.48 13,730,228.16
- Kabel NYFGbY 4 x 4 mm2 m 30.00 30,800.00 924,000.00
- Kabel NYFGbY 3 x 4 mm2 m 50.00 30,800.00 1,540,000.00
- Kabel NYFGbY 3 x 2,5 mm2 m 50.00 30,800.00 1,540,000.00
- Kabel NYFGbY 4 x 2,5 mm2 m 60.00 30,800.00 1,848,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 40.00 30,800.00 1,232,000.00
Dari panel PP-LR3
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 807,660.48 13,730,228.16
- Kabel NYFGbY 3 x 2,5 mm2 m 150.00 30,800.00 4,620,000.00
- Kabel NYFGbY 4 x 4 mm2 m 50.00 30,800.00 1,540,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 220.00 30,800.00 6,776,000.00
Jumlah 70,450,684.48

BANGUNAN RESERVOIR GEROKGAK Err:509


A BANGUNAN RESERVOIR KAPASITAS 500 M3 Err:509

1 PEKERJAAN TANAH
1 Pengukuran dan Pasang Bowplank m' 73.10 - -
2 Galian Tanah dengan excavator m3 421.35 - -
3 Urugan Tanah Kembali dengan Pemadatan m3 72.92 - -
4 Urugan Pasir t = 10 cm m3 19.48 - -
Jumlah -
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
2 PEKERJAAN STRUKTUR ATAU SIPIL DAN ASITEKTUR
a Pekerjaan Beton
2 Lantai Kerja K - 125 (1 PC : 3 PS : 5KR)
- Cor Beton Camp 1:3:5 m3 19.48 - -
4 Pekerjaan Sloof
- Beton Cor K-300 m3 7.90 - -
- Pekerjaan Besi Beton Kg 1,999.89 - -
- Begesting Pasangan Batako m2 68.98 - -
5 Pekerjaan Beton Lantai
- Beton Cor K-300 m3 52.31 - -
- besi Beton Kg 7,923.26 - -
6 Pekerjaan Beton Kolom
- Beton Cor K-300 m3 7.39 - -
- besi Beton Kg 1,893.54 - -
- Begesting 2 X pakai m2 129.20 - -
7 Pekerjaan Beton Dinding
- Beton Cor K-300 m3 47.07 - -
- besi Beton Kg 5,328.93 - -
- Begesting 2 X pakai m2 470.68 - -
- Pekerjaan Tie Rod pada Bekisting Vertikal m1 368.00 - -
9 Pekerjaan Beton Balok
- Beton Cor K-300 m3 7.23 - -
- besi Beton Kg 1,929.63 - -
- Begesting 2 X pakai m2 101.26 - -
###Pekerjaan Beton Plat Atap
- Beton Cor K-300 m3 20.92 - -
- besi Beton Kg 3,840.13 - -
- Begesting m2 209.23 - -
Jumlah -

b Pekerjaan Pasangan dan Pelapis


###Pekerjaan Pas, Dinding Bata Merah m2 259.00 - -
###Pekerjaan Water Proofing m2 1,171.80 - -
###Pekerjaan Water Stop m 235.70 - -
###Pekerjaan Plesteran 1 PC : 2 Ps m2 1,207.72 - -
###Pekerjaan Acian m2 35.92 - -
Jumlah -
c Pekerjaan Kusen Pintu dan Relling
###Pekerjaan Pipa Ventilasi GIP 4" Unit 4.00 750,000.00 3,000,000.00
###Pekerjaan Penutup Man Hole Plat Besi T= 1.2 mm Unit 5.00 Err:509 Err:509
###Pekerjaan Tangga Inspeksi Pipa GIP Unit 4.00 Err:509 Err:509
Pekerjaan Tangga Besi Kg 194.60 - -
Jumlah Err:509
3 PEKERJAAN PIPA DAN ACCESSORIES
Pengadaan
Pipa In Flow Pipa Baja Three layer Polythylene dia.OD 355,6 mm, tebal dind m 53.10 - -
Pipa Over Flow dan Penguras Pipa Baja Three layer Polythylene dia.OD 355 m 57.83 - -
Pipa Out Flow Pipa Baja Three layer Polythylene dia.OD 355,6 mm, tebal di m 55.02 - -
Bend 90° Three Layer Polythelene dia OD 355,6 mm, tebal dinding 5,16 mm bh 7.00 - -
Tee OD 355,6 X 355,6 bh 1.00 - -
Strainer Y OD Ø 355,6 bh 1.00 Err:509 Err:509
AF Gate Valve PN 16 dia. 14'' bh 3.00 - -
Dismantling Joint dia. 14'' bh 3.00 - -
Watermeter dia. 14'' bh 1.00 Err:509 Err:509
End Cap dia. 14'' bh 1.00 - -
Saringan dia. 14'' bh 1.00 3,500,000.00 3,500,000.00
Pemasangan
Pipa In Flow Pipa Baja Three layer Polythylene dia.OD 355,6 mm, tebal dind m 53.10 - -
Pipa Over Flow dan Penguras Pipa Baja Three layer Polythylene dia.OD 355 m 57.83 - -
Pipa Out Flow Pipa Baja Three layer Polythylene dia.OD 355,6 mm, tebal di m 55.02 - -
Bend 90° Three Layer Polythelene dia OD 355,6 mm, tebal dinding 5,16 mm bh 7.00 60,000.00 420,000.00
Tee OD 355,6 X 355,6 bh 1.00 60,000.00 60,000.00
Strainer Y OD Ø 355,6 bh 1.00 60,000.00 60,000.00
AF Gate Valve PN 16 dia. 14'' bh 3.00 60,000.00 180,000.00
Dismantling Joint dia. 14'' bh 3.00 60,000.00 180,000.00
Watermeter dia. 14'' bh 1.00 60,000.00 60,000.00
End Cap dia. 14'' bh 1.00 60,000.00 60,000.00
Saringan dia. 14'' bh 1.00 60,000.00 60,000.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
Jumlah Err:509
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
9,394,638.00
B POS JAGA
1 Pekerjaan Tanah
1 Pengukuran dan Pasang Bowplank m' 32.40 - -
2 Galian Tanah dengan excavator m3 23.35 - -
3 Urugan Tanah Kembali dengan Pemadatan m3 10.48 - -
4 Urugan Pasir t = 10 cm m3 1.13 - -
1 Pek. Urugan Tanah Peninggian Lantai m3 1.50 - -
2 Pek. Urugan Pasir Lantai Kerja m3 1.07 - -
Jumlah -
2 PEKERJAAN STRUKTUR ATAU SIPIL DAN ASITEKTUR
a Pekerjaan Beton
2 Lantai Kerja K - 125 (1 PC : 3 PS : 5KR)
- Cor Beton Camp 1:3:5 m3 1.07 - -
4 Pekerjaan Sloof
- Beton Cor K-300 m3 1.44 - -
- Pekerjaan Besi Beton Kg 163.30 - -
- Begesting Pasangan Batako m2 14.35 - -
6 Pekerjaan Beton Kolom
- Beton Cor K-300 m3 0.96 - -
- besi Beton Kg 193.49 - -
- Begesting 2 X pakai m2 25.51 - -
9 Pekerjaan Beton Balok
- Beton Cor K-300 m3 1.57 - -
- besi Beton Kg 273.81 - -
- Begesting 2 X pakai m2 29.94 - -
9 Pekerjaan Beton Plat Atap
- Beton Cor K-300 m3 1.79 - -
- besi Beton Kg 419.47 - -
- Begesting 1 X pakai m2 14.88 - -
9 Pekerjaan Beton Lisplank
- Beton Cor K-300 m3 0.61 - -
- besi Beton Kg 249.26 - -
- Begesting 2 X pakai m2 13.76 - -
9 Pekerjaan Meja Beton
- Beton Cor K-300 m3 0.10 - -
- besi Beton Kg 25.69 - -
- Begesting 2 X pakai m2 1.95 - -
Jumlah -

b Pekerjaan Pasangan dan Pelapis


Pekerjaan Pasangan Batu Kosong m3 3.40 - -
Pekerjaan Pasangan Batu Kali Camp 1 : 5 m3 9.04 - -
###Pekerjaan Pasangan Bata Camp 1:5 m2 99.88 - -
Pekerjaan Trasram m2 13.68 - -
###Pekerjaan Plesteran 1 PC : 5 PS m2 199.76 - -
###Pekerjaan Acian m2 199.76 - -
Pekerjaan Cat Dinding m2 199.76 - -
1 Pek. Pas. Batu Alam Random m2 13.76 - -
2 Pek. Tempelan Batu Candi m2 30.83 - -
Jumlah -

c Pekerjaan Atap
###Pekerjaan Rangka Kuda-Kuda Atap m3 0.46 - -
###Pekerjaan Usuk dan Reng m2 53.04 - -
###Pekerjaan Pasangan Atap Genteng m2 18.71 - -
Pekerjaan Pas Bubungan m' 22.15 - -
Pekerjaan Pas. Ikut Celedu unit 4.00 - -
Pekerjaan Pas. Murda unit 2.00 - -
Pekerjaan Pas. Listplank m' 19.40 - -
Pekerjaan Pas. Tatab m' 19.72 - -
Pek. Cat Listplank m2 9.70 - -
Jumlah -
d Pekerjaan Langit-Langit
###Pas. Plafond Kasiboard Rangka Hollow m3 21.37 - -
###Pas. List Gypsum m' 37.60 - -
###Pek. Cat Plafond m2 21.37 - -
Jumlah -
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
e Pekerjaan Penutup Lantai
###Pas.Keramik 30 x 30 cm m2 20.68 - -
###Pas. Keramik 20x30 cm m2 2.25 - -
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
Pas. Keramik Dinding m2 12.60 - -
###Pas. Stepnozing m' 6.00 - -
Jumlah -
f Pekerjaan Kusen Pintu dan Jendela
###Pas. Kusen Kayu Kamper m3 0.23 - -
###Pas. Daun Pintu Kayu Kamper m2 5.19 - -
###Pas. Jendela Kaca m2 1.76 - -
Pas. Kaca Bening t = 5 mm m2 0.78 - -
###Pas. Engsel Pintu set 6.00 - -
Pas. Grendel Pintu unit 2.00 - -
###Pas. Handle & Kunci Pintu m' 2.00 - -
Pas. Engsel Jendela unit 8.00 - -
Pas. Grendel Jendela unit 4.00 - -
Pas. Kait Angin unit 8.00 - -
Pek. Polituran m2 28.50 - -
Jumlah -
g Pekerjaan Toilet
1 Instalasi Plumbing Air Bersih m 25.00 42,900.00 1,072,500.00
2 Instalasi Plumbing Air Kotor m 36.00 231,170.50 8,322,138.00
3 Closet duduk bh 1.00 - -
4 Pasang Washtafel set 1.00 - -
5 Pasang Floor Drain set 1.00 - -
6 Pasang Kran air set 2.00 - -
Pekerjaan Septiktank unit 1.00 - -
Pekerjaan Peresapan unit 1.00 - -
Jumlah 9,394,638.00

-
C PAGAR
Pengukuran dan Pasang Bowplank m' 80.36 - -
Galian Tanah dengan excavator m3 20.49 - -
Urugan Tanah Kembali dengan Pemadatan m3 21.22 - -
Urugan Pasir t = 10 cm m3 1.21 - -
Pekerjaan Pasangan Batu Kosong m3 3.62 - -
Pekerjaan Pasangan Batu Kali Camp 1 : 5 m3 13.26 - -
Pekerjaan Sloof
- Beton Cor K-300 m3 4.02 - -
- Pekerjaan Besi Beton Kg 446.16 - -
- Begesting 2 X pakai m2 40.23 - -
Pekerjaan Beton Kolom
- Beton Cor K-300 m3 4.02 - -
- besi Beton Kg 446.16 - -
- Begesting 2 X pakai m2 40.23 - -
Pekerjaan Beton Balok
- Beton Cor K-300 m3 1.37 - -
- besi Beton Kg 240.84 - -
- Begesting 2 X pakai m2 36.48 - -
###Pekerjaan Pasangan Bata Camp 1:5 m2 112.50 - -
###Pekerjaan Plesteran 1 PC : 5 PS m2 373.67 - -
###Pekerjaan Acian m2 373.67 - -
Pekerjaan Paving t=8 mm, K225 m2 189.35 - -
Jumlah -

1,031,487,799.70
D PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
a Pengadaan mekanikal dan aksesoris
Perpipaan Inlet
- Ø 350 mm Steel pipe SCH.40 m 21.00 3,363,656.73 70,636,791.23
- Ø 350 mm Flange las unit 4.00 4,040,278.00 16,161,112.00
- Ø 350 mm x 90 Steel Bend fl - fl unit 4.00 2,956,800.00 11,827,200.00
- Ø 350 mm x 0,60 m' Double fl - fl ( Wall pipa ) unit 1.00 6,215,638.00 6,215,638.00
- Ø 350 mm Karet Packing unit 7.00 62,315.00 436,205.00
- M24 Baut mur set 64.00 44,187.00 2,827,968.00
Perpipaan Outlet
- Ø 300 mm x 0,60 m' Double fl - fl ( Wall pipa ) unit 2.00 3,687,800.60 7,375,601.20
- Ø 300 mm Steel pipe SCH.40 m' 2.00 2,598,676.66 5,197,353.33
- Ø 300 mm DI Gate Valve metal resilient Seated all flange unit 1.00 27,806,142.65 27,806,142.65
- Ø 300 mm Dismantling Joint/Adaptor unit 1.00 3,047,616.00 3,047,616.00
- Ø 300 mm Water meter unit 1.00 6,548,850.00 6,548,850.00
- Ø 300 mm Strainer unit 1.00 4,621,848.00 4,621,848.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Ø 300 mm Saringan unit 1.00 4,086,720.00 4,086,720.00
- Ø 300 mm x 90 Steel Bend fl - fl unit 1.00 1,927,124.23 1,927,124.23
- Ø 300 mm Flange las unit 12.00 3,404,257.12 40,851,085.44
- Ø 300 mm Karet Packing unit 13.00 45,320.00 589,160.00
- M24 Baut mur set 192.00 44,187.00 8,483,904.00
Perpipaan Drain dan Overflow
- Ø 350 mm x 0,60 m' Double fl - fl ( Wall pipa ) unit 1.00 6,215,638.00 6,215,638.00
- Ø 300 mm x 0,60 m' Double fl - fl ( Wall pipa ) unit 2.00 3,687,800.60 7,375,601.20
- Ø 350 mm Steel pipe SCH.40 m' 4.00 3,363,656.73 13,454,626.90
- Ø 300 mm Steel pipe SCH.40 m' 3.00 2,598,676.66 7,796,029.99
- Ø 350 mm DI Gate Valve metal resilient Seated all flange unit 1.00 29,960,409.60 29,960,409.60
- Ø 350 mm Dismantling Joint/Adaptor unit 1.00 3,535,294.40 3,535,294.40
- Ø 350 mm x Ø 300 mm Tee steel unit 1.00 3,843,840.00 3,843,840.00
- Ø 350 mm x 90 Steel Bend fl - fl unit 2.00 2,956,800.00 5,913,600.00
- Ø 300 mm x 90 Steel Bend fl - fl set 1.00 1,927,124.23 1,927,124.23
- Ø 350 mm Flange las set 10.00 4,040,278.00 40,402,780.00
- Ø 300 mm Flange las set 5.00 3,404,257.12 17,021,285.60
- Ø 300 mm Karet Packing unit 10.00 45,320.00 453,200.00
- Ø 350 mm Karet Packing unit 5.00 62,315.00 311,575.00
- M24 Baut mur unit 240.00 44,187.00 10,604,880.00
- Manhole plat besi T=1.2 MM unit 3.00 1,706,292.50 5,118,877.50
- Pipa Vent unit 3.00 286,000.00 858,000.00
- Ø 50 mm pipa Drainase PVC unit 2.00 101,062.50 202,125.00
Jumlah 373,635,206.49

b Pemasangan mekanikal dan aksesoris


Perpipaan Inlet
- Ø 350 mm Steel pipe SCH.40 m 21.00 21,896.31 459,822.59
- Ø 350 mm Flange las unit 4.00 521,723.13 2,086,892.50
- Ø 350 mm x 90 Steel Bend fl - fl unit 4.00 99,253.00 397,012.00
- Ø 350 mm x 0,60 m' Double fl - fl ( Wall pipa ) unit 1.00 129,910.00 129,910.00
- Ø 350 mm Karet Packing unit 7.00 1,561.66 10,931.59
- M24 Baut mur set 64.00 892.38 57,112.00
Perpipaan Outlet 0
- Ø 300 mm x 0,60 m' Double fl - fl ( Wall pipa ) unit 2.00 136,620.00 273,240.00
- Ø 300 mm Steel pipe SCH.40 m' 2.00 196,303.35 392,606.70
- Ø 300 mm DI Gate Valve metal resilient Seated all flange unit 1.00 215,176.50 215,176.50
- Ø 300 mm Dismantling Joint/Adaptor unit 1.00 214,901.50 214,901.50
- Ø 300 mm Water meter unit 1.00 214,901.50 214,901.50
- Ø 300 mm Strainer unit 1.00 129,827.50 129,827.50
- Ø 300 mm Saringan unit 1.00 129,827.50 129,827.50
- Ø 300 mm x 90 Steel Bend fl - fl unit 1.00 136,620.00 136,620.00
- Ø 300 mm Flange las unit 12.00 521,723.13 6,260,677.50
- Ø 300 mm Karet Packing unit 13.00 1,561.66 20,301.53
- M24 Baut mur set 192.00 892.38 171,336.00
Perpipaan Drain dan Overflow
- Ø 350 mm x 0,60 m' Double fl - fl ( Wall pipa ) unit 1.00 129,910.00 129,910.00
- Ø 300 mm x 0,60 m' Double fl - fl ( Wall pipa ) unit 2.00 136,620.00 273,240.00
- Ø 350 mm Steel pipe SCH.40 m' 4.00 21,896.31 87,585.26
- Ø 300 mm Steel pipe SCH.40 m' 3.00 196,303.35 588,910.05
- Ø 350 mm DI Gate Valve metal resilient Seated all flange unit 1.00 215,176.50 215,176.50
- Ø 350 mm Dismantling Joint/Adaptor unit 1.00 104,489.00 104,489.00
- Ø 350 mm x Ø 300 mm Tee steel unit 1.00 521,723.13 521,723.13
- Ø 350 mm x 90 Steel Bend fl - fl unit 2.00 99,253.00 198,506.00
- Ø 300 mm x 90 Steel Bend fl - fl set 1.00 136,620.00 136,620.00
- Ø 350 mm Flange las set 10.00 521,723.13 5,217,231.25
- Ø 300 mm Flange las set 5.00 521,723.13 2,608,615.63
- Ø 300 mm Karet Packing unit 10.00 1,561.66 15,616.56
- Ø 350 mm Karet Packing unit 5.00 1,561.66 7,808.28
- M24 Baut mur unit 240.00 892.38 214,170.00
- Manhole plat besi T=1.2 MM unit 3.00 93,749.59 281,248.77
- Pipa Vent unit 3.00 44,187.00 132,561.00
- Ø 50 mm pipa Drainase PVC unit 2.00 44,187.00 88,374.00
Jumlah 22,122,882.33
c Pengadaan Elektrikal dan Accesories
Panel Penerangan Pos Jaga (PP-PJ)
- Box Plastic mini pragma pintu tranparant, inbow, 12 modul Unit 1.00 186,780.00 186,780.00
- MCB 3P/16A 10 KA unit 1.00 190,129.50 190,129.50
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- RCCB/ELCB, 4P, 25A, Sensitifitas : 30 mA unit 1.00 568,551.50 568,551.50
- MCB 1P/6A 6 KA unit 4.00 40,414.00 161,656.00
- MCB 1P/10A 6 KA unit 1.00 40,414.00 40,414.00
- Box plastic mini pragma pintu transparant, inbow, 12 modul unit 1.00 308,000.00 308,000.00
- MCB 1P/16A 6 KA unit 1.00 200,200.00 200,200.00
- RCCB/ELCB, 2P, 16A, Sensitifitas : 30 mA unit 1.00 1,074,150.00 1,074,150.00
- MCB 1P/4A 6 KA unit 6.00 161,700.00 970,200.00
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 807,660.48 807,660.48
Penerangan Ruang Pos Jaga 0
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 396,000.00 396,000.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 528,000.00 528,000.00
- Single switch 10 A/ 220V plano unit 6.00 18,700.00 112,200.00
- Double Switch 10 A/ 220V plano unit 2.00 23,100.00 46,200.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 4.00 253,605.40 1,014,421.58
- Kabel NYM 3 x 2,5 mm2 m 80.00 14,300.00 1,144,000.00
- uPVC Conduit 20 m m 70.00 8,635.00 604,450.00
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
- Lampu TL 2 X 18W/WP unit 9.00 65,450.00 589,050.00
- Lampu jalan 50 W /SINGEL unit 12.00 513,128.00 6,157,536.00
- Outlet 10 A/2P+E 220V unit 6.00 170,940.00 1,025,640.00
- Single switch 10 A/ 220V plano unit 6.00 18,700.00 112,200.00
- Kabel dari P. Penerangan ke PJU
- - NYFGBY 3 x 2,5 mm2 meter 280.00 43,274.00 12,116,720.00
- Kabel dari P. Penerangan ke Lampu Taman
- - NYFGBY 3 x 2,5 mm2 meter 130.00 43,274.00 5,625,620.00
- Kabel dari P. Penerangan ke lampu stop kontak Penguras
- - NYFGBY 3 x 2,5 mm2 meter 90.00 43,274.00 3,894,660.00
- Junction Box untuk kabel NYFGBY ke NYM unit 1.00 1,099,560.00 1,099,560.00
- Instalasi titik lampu titik 15.00 589,050.00 8,835,750.00
- Instalasi titik lampu jalan titik 12.00 589,050.00 7,068,600.00
- Instalasi stop kontak titik 6.00 392,700.00 2,356,200.00
Jumlah 57,269,749.06
d Pemasangan Elektrikal dan Accesories
Panel Penerangan Pos Jaga (PP-PJ)
- Perakitan dan Pemasangan lengkap termasuk aksesoris set 1.00 807,660.48 807,660.48
Penerangan Ruang Pos Jaga
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 4.00 24,200.00 96,800.00
- Titik Lampu titik 2.00 72,689.44 145,378.88
Penyambungan Listrik PLN 0
- Uang Jaminan Pelanggan VA 4,400.00 272.25 1,197,900.00
- Biaya penyambungan VA 4,400.00 555.50 2,444,200.00
- Biaya installatir termasuk Sertifikasi Laik Operasi VA 4,400.00 145.20 638,880.00
- Biaya konstruksi dan peralatan penunjang LS 1.00 226,671,423.94 226,671,423.94
Jumlah 232,082,983.30

e Pengadaan Elektrikal dan Accesories


Panel Penerangan Pos Jaga (PP-PJ)
- Box Plastic mini pragma pintu tranparant, inbow, 12 modul Unit 1.00 186,780.00 186,780.00
- MCB 3P/16A 10 KA unit 1.00 190,129.50 190,129.50
- RCCB/ELCB, 4P, 25A, Sensitifitas : 30 mA unit 1.00 568,551.50 568,551.50
- MCB 1P/6A 6 KA unit 4.00 40,414.00 161,656.00
- MCB 1P/10A 6 KA unit 1.00 40,414.00 40,414.00
Penerangan Toilet
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 396,000.00 396,000.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 528,000.00 528,000.00
- Single switch 10 A/ 220V plano unit 8.00 18,700.00 149,600.00
- Double Switch 10 A/ 220V plano unit 2.00 23,100.00 46,200.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 6.00 253,605.40 1,521,632.38
- Kabel NYM 3 x 2,5 mm2 m 200.00 14,300.00 2,860,000.00
- uPVC Conduit 20 m m 75.00 8,635.00 647,625.00
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
Penerangan Ruang Pos Jaga
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 396,000.00 396,000.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 528,000.00 528,000.00
- Single switch 10 A/ 220V plano unit 6.00 18,700.00 112,200.00
- Double Switch 10 A/ 220V plano unit 2.00 23,100.00 46,200.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 4.00 253,605.40 1,014,421.58
- Kabel NYM 3 x 2,5 mm2 m 80.00 14,300.00 1,144,000.00
- uPVC Conduit 20 m m 70.00 8,635.00 604,450.00
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
- Panel Lokal Valve Sedimentasi 0
- Penangkal Petir type Elctrode dengan Rmin = 60m LS 1.00 10,822,650.43 10,822,650.43
- Grounding Anchor Rot 4 meter (3/4) unit 5.00 770,000.00 3,850,000.00
- - NYA 50 mm2 meter 10.00 150,150.00 1,501,500.00
- Clamp Anchor Rot 50 mm2 unit 2.00 16,940.00 33,880.00
- Air terminal Ø 1, termasuk dudukan, komplit set 1.00 686,511.41 686,511.41
- GIP Ø 3 unit 1.00 1,811,040.00 1,811,040.00
- GIP Ø 2 unit 1.00 123,200.00 123,200.00
- Box control 30x30x70 cm unit 1.00 848,043.50 848,043.50
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 807,660.48 807,660.48
- Pengesahan Depnaker LS 1.00 4,620,000.00 4,620,000.00
Jumlah 36,316,745.78

f Pemasangan Elektrikal dan Accesories


Panel Penerangan Pos Jaga (PP-PJ)
- Perakitan dan Pemasangan lengkap termasuk aksesoris set 1.00 807,660.48 807,660.48
- Penerangan Toilet
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 6.00 24,200.00 145,200.00
- Titik Lampu titik 2.00 72,689.44 145,378.88
Penerangan Ruang Pos Jaga
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 4.00 24,200.00 96,800.00
- Titik Lampu titik 2.00 72,689.44 145,378.88
Jumlah 1,501,898.24
g Pengadaan Lampu penerangan luar
Dari panel PP-LR1
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 2,464,000.00 41,888,000.00
- Tiang lampu hot dip galvanis 6 m set 17.00 2,200,000.00 37,400,000.00
- Kabel NYFGbY 3 x 4 mm2 m 15.00 26,950.00 404,250.00
- Kabel NYFGbY 3 x 2,5 mm2 m 185.00 18,700.00 3,459,500.00
- Kabel NYFGbY 2 x 2,5 mm2 m 100.00 15,950.00 1,595,000.00
- GIP 2" m 6.00 123,200.00 739,200.00
Dari panel PP-LR2
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 2,464,000.00 41,888,000.00
- Tiang lampu hot dip galvanis 6 m set 17.00 2,200,000.00 37,400,000.00
- Kabel NYFGbY 4 x 4 mm2 m 30.00 31,900.00 957,000.00
- Kabel NYFGbY 3 x 4 mm2 m 50.00 26,950.00 1,347,500.00
- Kabel NYFGbY 3 x 2,5 mm2 m 50.00 18,700.00 935,000.00
- Kabel NYFGbY 4 x 2,5 mm2 m 60.00 22,000.00 1,320,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 40.00 15,950.00 638,000.00
Dari panel PP-LR3
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 2,464,000.00 41,888,000.00
- Kabel NYFGbY 3 x 2,5 mm2 m 150.00 18,700.00 2,805,000.00
- Kabel NYFGbY 4 x 4 mm2 m 50.00 31,900.00 1,595,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 220.00 15,950.00 3,509,000.00
- 5. GIP 2" m 6.00 123,200.00 739,200.00
- Tiang lampu hot dip galvanis 6 m set 8.00 2,200,000.00 17,600,000.00
Jumlah 238,107,650.00
h Pemasangan Lampu penerangan luar
Dari panel PP-LR1
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 807,660.48 13,730,228.16
- Kabel NYFGbY 3 x 4 mm2 m 15.00 30,800.00 462,000.00
- Kabel NYFGbY 3 x 2,5 mm2 m 185.00 30,800.00 5,698,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 100.00 30,800.00 3,080,000.00
Dari panel PP-LR2
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 807,660.48 13,730,228.16
- Kabel NYFGbY 4 x 4 mm2 m 30.00 30,800.00 924,000.00
- Kabel NYFGbY 3 x 4 mm2 m 50.00 30,800.00 1,540,000.00
- Kabel NYFGbY 3 x 2,5 mm2 m 50.00 30,800.00 1,540,000.00
- Kabel NYFGbY 4 x 2,5 mm2 m 60.00 30,800.00 1,848,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 40.00 30,800.00 1,232,000.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
Dari panel PP-LR3
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 807,660.48 13,730,228.16
- Kabel NYFGbY 3 x 2,5 mm2 m 150.00 30,800.00 4,620,000.00
- Kabel NYFGbY 4 x 4 mm2 m 50.00 30,800.00 1,540,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 220.00 30,800.00 6,776,000.00
Jumlah 70,450,684.48

BANGUNAN RESERVOIR CELUKAN BAWANG Err:509


Err:509
A BANGUNAN RESERVOIR KAPASITAS 400 M3
1 PEKERJAAN TANAH
1 Pengukuran dan Pasang Bowplank m' 66.50 - -
2 Galian Tanah dengan excavator m3 317.06 - -
3 Urugan Tanah Kembali dengan Pemadatan m3 64.01 - -
4 Urugan Pasir t = 10 cm m3 16.44 - -
Jumlah -
2 PEKERJAAN STRUKTUR ATAU SIPIL DAN ASITEKTUR
a Pekerjaan Beton
2 Lantai Kerja K - 125 (1 PC : 3 PS : 5KR)
- Cor Beton Camp 1:3:5 m3 16.44 - -
4 Pekerjaan Sloof
- Beton Cor K-300 m3 6.41 - -
- Pekerjaan Besi Beton Kg 1,640.97 - -
- Begesting Pasangan Batako m2 56.60 - -
5 Pekerjaan Beton Lantai
- Beton Cor K-300 m3 52.31 - -
- besi Beton Kg 6,068.76 - -
6 Pekerjaan Beton Kolom
- Beton Cor K-300 m3 6.41 - -
- besi Beton Kg 1,616.28 - -
- Begesting 2 X pakai m2 111.32 - -
7 Pekerjaan Beton Dinding
- Beton Cor K-300 m3 47.87 - -
- besi Beton Kg 5,624.93 - -
- Begesting 2 X pakai m2 478.72 - -
- Pekerjaan Tie Rod pada Bekisting Vertikal m1 375.00 - -
9 Pekerjaan Beton Balok
- Beton Cor K-300 m3 6.00 - -
- besi Beton Kg 1,590.41 - -
- Begesting 2 X pakai m2 83.93 - -
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
###Pekerjaan Beton Plat Atap
- Beton Cor K-300 m3 16.23 - -
- besi Beton Kg 2,992.03 - -
- Begesting m2 162.33 - -
Jumlah -

c Pekerjaan Pasangan dan Pelapis


###Pekerjaan Pas, Dinding Bata Merah m2 80.85 - -
###Pekerjaan Water Proofing m2 772.62 - -
###Pekerjaan Water Stop m 106.50 - -
###Pekerjaan Plesteran 1 PC : 2 Ps m2 809.92 - -
###Pekerjaan Acian m2 37.29 - -
Jumlah -

d Pekerjaan Kusen dan Relling


###Pekerjaan Pipa Ventilasi GIP 4" Unit 4.00 750,000.00 3,000,000.00
###Pekerjaan Penutup Man Hole Plat Besi T= 1.2 mm Unit 5.00 Err:509 Err:509
###Pekerjaan Tangga Inspeksi Pipa GIP Unit 4.00 Err:509 Err:509
Pekerjaan Tangga Besi Kg 183.55 - -
Jumlah Err:509
3 PEKERJAAN PIPA DAN ACCESSORIES
Pengadaan
Pipa In Flow Pipa Baja Three layer Polythylene dia.OD 355,6 mm, tebal dind m 53.10 - -
Pipa Over Flow dan Penguras Pipa Baja Three layer Polythylene dia.OD 355 m 57.83 - -
Pipa Out Flow Pipa Baja Three layer Polythylene dia.OD 355,6 mm, tebal di m 55.02 - -
Bend 90° Three Layer Polythelene dia OD 355,6 mm, tebal dinding 5,16 mm bh 7.00 - -
Tee OD 355,6 X 355,6 bh 1.00 - -
Strainer Y OD Ø 355,6 bh 1.00 Err:509 Err:509
AF Gate Valve PN 16 dia. 14'' bh 3.00 - -
Dismantling Joint dia. 14'' bh 3.00 - -
Watermeter dia. 14'' bh 1.00 Err:509 Err:509
Saringan dia. 14'' bh 1.00 3,500,000.00 3,500,000.00
Pemasangan
Pipa In Flow Pipa Baja Three layer Polythylene dia.OD 355,6 mm, tebal dind m 53.10 - -
Pipa Over Flow dan Penguras Pipa Baja Three layer Polythylene dia.OD 355 m 57.83 - -
Pipa Out Flow Pipa Baja Three layer Polythylene dia.OD 355,6 mm, tebal di m 55.02 - -
Bend 90° Three Layer Polythelene dia OD 355,6 mm, tebal dinding 5,16 mm bh 7.00 60,000.00 420,000.00
Tee OD 355,6 X 355,6 bh 1.00 60,000.00 60,000.00
Strainer Y OD Ø 355,6 bh 1.00 60,000.00 60,000.00
AF Gate Valve PN 16 dia. 14'' bh 3.00 60,000.00 180,000.00
Dismantling Joint dia. 14'' bh 3.00 60,000.00 180,000.00
Watermeter dia. 14'' bh 1.00 60,000.00 60,000.00
Saringan dia. 14'' bh 1.00 60,000.00 60,000.00
Jumlah Err:509

-
B PAGAR
Pengukuran dan Pasang Bowplank m' 70.60 - -
Galian Tanah dengan excavator m3 18.00 - -
Urugan Tanah Kembali dengan Pemadatan m3 18.64 - -
Urugan Pasir t = 10 cm m3 1.06 - -
Pekerjaan Pasangan Batu Kosong m3 3.18 - -
Pekerjaan Pasangan Batu Kali Camp 1 : 5 m3 11.65 - -
Pekerjaan Sloof
- Beton Cor K-300 m3 3.54 - -
- Pekerjaan Besi Beton Kg 392.24 - -
- Begesting 2 X pakai m2 35.35 - -
Pekerjaan Beton Kolom
- Beton Cor K-300 m3 3.54 - -
- besi Beton Kg 392.24 - -
- Begesting 2 X pakai m2 35.35 - -
Pekerjaan Beton Balok
- Beton Cor K-300 m3 1.03 - -
- besi Beton Kg 180.63 - -
- Begesting 2 X pakai m2 27.36 - -
###Pekerjaan Pasangan Bata Camp 1:5 m2 98.84 - -
###Pekerjaan Plesteran 1 PC : 5 PS m2 328.29 - -
###Pekerjaan Acian m2 328.29 - -
Pekerjaan Paving t=8 mm, K225 m2 299.00 - -
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
Jumlah -
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
1,039,986,460.23
C PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
a Pengadaan mekanikal dan aksesoris
Perpipaan Inlet
- Ø 350 mm Steel pipe SCH.40 m 21.00 3,363,656.73 70,636,791.23
- Ø 350 mm Flange las unit 4.00 4,040,278.00 16,161,112.00
- Ø 350 mm x 90 Steel Bend fl - fl unit 4.00 6,546,474.00 26,185,896.00
- Ø 350 mm x 0,60 m' Double fl - fl ( Wall pipa ) unit 1.00 5,108,400.00 5,108,400.00
- Ø 350 mm Karet Packing unit 7.00 62,315.00 436,205.00
- M24 Baut mur set 64.00 44,187.00 2,827,968.00
Perpipaan Outlet
- Ø 300 mm x 0,60 m' Double fl - fl ( Wall pipa ) unit 2.00 3,687,800.60 7,375,601.20
- Ø 300 mm Steel pipe SCH.40 m' 2.00 2,598,676.66 5,197,353.33
- Ø 300 mm DI Gate Valve metal resilient Seated all flange unit 1.00 27,806,142.65 27,806,142.65
- Ø 300 mm Dismantling Joint/Adaptor unit 1.00 3,047,616.00 3,047,616.00
- Ø 300 mm Water meter unit 1.00 6,548,850.00 6,548,850.00
- Ø 300 mm Strainer unit 1.00 5,275,248.00 5,275,248.00
- Ø 300 mm Saringan unit 1.00 4,086,720.00 4,086,720.00
- Ø 300 mm x 90 Steel Bend fl - fl unit 1.00 1,927,124.23 1,927,124.23
- Ø 300 mm Flange las unit 12.00 3,404,257.12 40,851,085.44
- Ø 300 mm Karet Packing unit 13.00 45,320.00 589,160.00
- M24 Baut mur set 192.00 44,187.00 8,483,904.00
Perpipaan Drain dan Overflow
- Ø 350 mm x 0,60 m' Double fl - fl ( Wall pipa ) unit 1.00 6,215,638.00 6,215,638.00
- Ø 300 mm x 0,60 m' Double fl - fl ( Wall pipa ) unit 2.00 3,687,800.60 7,375,601.20
- Ø 350 mm Steel pipe SCH.40 m' 4.00 3,363,656.73 13,454,626.90
- Ø 300 mm Steel pipe SCH.40 m' 3.00 2,598,676.66 7,796,029.99
- Ø 300 mm DI Gate Valve metal resilient Seated all flange unit 1.00 27,806,142.65 27,806,142.65
- Ø 300 mm Dismantling Joint/Adaptor unit 1.00 3,047,616.00 3,047,616.00
- Ø 300 mm x Ø 350 mm Tee steel unit 1.00 3,843,840.00 3,843,840.00
- Ø 350 mm x 90 Steel Bend fl - fl unit 2.00 2,956,800.00 5,913,600.00
- Ø 300 mm x 90 Steel Bend fl - fl set 1.00 1,872,200.00 1,872,200.00
- Ø 300 mm Flange las set 10.00 3,404,257.12 34,042,571.20
- Ø 350 mm Flange las set 5.00 4,040,278.00 20,201,390.00
- Ø 300 mm Karet Packing unit 10.00 45,320.00 453,200.00
- Ø 350 mm Karet Packing unit 5.00 62,315.00 311,575.00
- M24 Baut mur unit 240.00 44,187.00 10,604,880.00
- Manhole plat besi T=1.2 MM unit 3.00 1,706,292.50 5,118,877.50
- Pipa Vent unit 3.00 286,000.00 858,000.00
- Ø 50 mm pipa Drainase PVC unit 2.00 101,062.50 202,125.00
Jumlah 381,663,090.51

b Pemasangan mekanikal dan aksesoris


Perpipaan Inlet
- Ø 350 mm Steel pipe SCH.40 m 21.00 21,896.31 459,822.59
- Ø 350 mm Flange las unit 4.00 521,723.13 2,086,892.50
- Ø 350 mm x 90 Steel Bend fl - fl unit 4.00 99,253.00 397,012.00
- Ø 350 mm x 0,60 m' Double fl - fl ( Wall pipa ) unit 1.00 129,910.00 129,910.00
- Ø 350 mm Karet Packing unit 7.00 1,561.66 10,931.59
- M24 Baut mur set 64.00 892.38 57,112.00
Perpipaan Outlet
- Ø 300 mm x 0,60 m' Double fl - fl ( Wall pipa ) unit 2.00 136,620.00 273,240.00
- Ø 300 mm Steel pipe SCH.40 m' 2.00 196,303.35 392,606.70
- Ø 300 mm DI Gate Valve metal resilient Seated all flange unit 1.00 215,176.50 215,176.50
- Ø 300 mm Dismantling Joint/Adaptor unit 1.00 214,901.50 214,901.50
- Ø 300 mm Water meter unit 1.00 214,901.50 214,901.50
- Ø 300 mm Strainer unit 1.00 129,827.50 129,827.50
- Ø 300 mm Saringan unit 1.00 129,827.50 129,827.50
- Ø 300 mm x 90 Steel Bend fl - fl unit 1.00 136,620.00 136,620.00
- Ø 300 mm Flange las unit 12.00 521,723.13 6,260,677.50
- Ø 300 mm Karet Packing unit 13.00 1,561.66 20,301.53
- M24 Baut mur set 192.00 892.38 171,336.00
Perpipaan Drain dan Overflow
- Ø 350 mm x 0,60 m' Double fl - fl ( Wall pipa ) unit 1.00 129,910.00 129,910.00
- Ø 300 mm x 0,60 m' Double fl - fl ( Wall pipa ) unit 2.00 136,620.00 273,240.00
- Ø 350 mm Steel pipe SCH.40 m' 4.00 196,303.35 785,213.40
- Ø 300 mm Steel pipe SCH.40 m' 3.00 196,303.35 588,910.05
- Ø 300 mm DI Gate Valve metal resilient Seated all flange unit 1.00 215,176.50 215,176.50
- Ø 300 mm Dismantling Joint/Adaptor unit 1.00 215,176.50 215,176.50
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Ø 300 mm x Ø 350 mm Tee steel unit 1.00 129,827.50 129,827.50
- Ø 350 mm x 90 Steel Bend fl - fl unit 2.00 129,827.50 259,655.00
- Ø 300 mm x 90 Steel Bend fl - fl set 1.00 129,827.50 129,827.50
- Ø 300 mm Flange las set 10.00 521,723.13 5,217,231.25
- Ø 350 mm Flange las set 5.00 521,723.13 2,608,615.63
- Ø 300 mm Karet Packing unit 10.00 1,561.66 15,616.56
- Ø 350 mm Karet Packing unit 5.00 1,561.66 7,808.28
- M24 Baut mur unit 240.00 892.38 214,170.00
- Manhole plat besi T=1.2 MM unit 3.00 93,749.59 281,248.77
- Pipa Vent unit 3.00 44,187.00 132,561.00
- Ø 50 mm pipa Drainase PVC unit 2.00 44,187.00 88,374.00
Jumlah 22,593,658.85
c Pengadaan Elektrikal dan Accesories
Panel Penerangan Pos Jaga (PP-PJ)
- Box Plastic mini pragma pintu tranparant, inbow, 12 modul Unit 1.00 186,780.00 186,780.00
- MCB 3P/16A 10 KA unit 1.00 190,129.50 190,129.50
- RCCB/ELCB, 4P, 25A, Sensitifitas : 30 mA unit 1.00 568,551.50 568,551.50
- MCB 1P/6A 6 KA unit 4.00 40,414.00 161,656.00
- MCB 1P/10A 6 KA unit 1.00 40,414.00 40,414.00
- Box plastic mini pragma pintu transparant, inbow, 12 modul unit 1.00 308,000.00 308,000.00
- MCB 1P/16A 6 KA unit 1.00 200,200.00 200,200.00
- RCCB/ELCB, 2P, 16A, Sensitifitas : 30 mA unit 1.00 1,074,150.00 1,074,150.00
- MCB 1P/4A 6 KA unit 6.00 161,700.00 970,200.00
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 807,660.48 807,660.48
Penerangan Ruang Pos Jaga 0
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 396,000.00 396,000.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 528,000.00 528,000.00
- Single switch 10 A/ 220V plano unit 6.00 18,700.00 112,200.00
- Double Switch 10 A/ 220V plano unit 2.00 23,100.00 46,200.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 4.00 253,605.40 1,014,421.58
- Kabel NYM 3 x 2,5 mm2 m 80.00 14,300.00 1,144,000.00
- uPVC Conduit 20 m m 70.00 8,635.00 604,450.00
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
- Lampu TL 2 X 18W/WP unit 9.00 65,450.00 589,050.00
- Lampu jalan 50 W /SINGEL unit 12.00 513,128.00 6,157,536.00
- Outlet 10 A/2P+E 220V unit 6.00 170,940.00 1,025,640.00
- Single switch 10 A/ 220V plano unit 6.00 18,700.00 112,200.00
- Kabel dari P. Penerangan ke PJU
- - NYFGBY 3 x 2,5 mm2 meter 280.00 43,274.00 12,116,720.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Kabel dari P. Penerangan ke Lampu Taman
- - NYFGBY 3 x 2,5 mm2 meter 130.00 43,274.00 5,625,620.00
- Kabel dari P. Penerangan ke lampu stop kontak Penguras
- - NYFGBY 3 x 2,5 mm2 meter 90.00 43,274.00 3,894,660.00
- Junction Box untuk kabel NYFGBY ke NYM unit 1.00 1,099,560.00 1,099,560.00
- Instalasi titik lampu titik 15.00 589,050.00 8,835,750.00
- Instalasi titik lampu jalan titik 12.00 589,050.00 7,068,600.00
- Instalasi stop kontak titik 6.00 392,700.00 2,356,200.00
Jumlah 57,269,749.06
d Pemasangan Elektrikal dan Accesories 0
Panel Penerangan Pos Jaga (PP-PJ) 0
- Perakitan dan Pemasangan lengkap termasuk aksesoris set 1.00 807,660.48 807,660.48
Penerangan Ruang Pos Jaga 0
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 4.00 24,200.00 96,800.00
- Titik Lampu titik 2.00 72,689.44 145,378.88
Penyambungan Listrik PLN 0
- Uang Jaminan Pelanggan VA 4,400.00 272.25 1,197,900.00
- Biaya penyambungan VA 4,400.00 555.50 2,444,200.00
- Biaya installatir termasuk Sertifikasi Laik Operasi VA 4,400.00 145.20 638,880.00
- Biaya konstruksi dan peralatan penunjang LS 1.00 226,671,423.94 226,671,423.94
Jumlah 232,082,983.30
-
e Pengadaan Elektrikal dan Accesories
Panel Penerangan Pos Jaga (PP-PJ)
- Box Plastic mini pragma pintu tranparant, inbow, 12 modul Unit 1.00 186,780.00 186,780.00
- MCB 3P/16A 10 KA unit 1.00 190,129.50 190,129.50
- RCCB/ELCB, 4P, 25A, Sensitifitas : 30 mA unit 1.00 568,551.50 568,551.50
- MCB 1P/6A 6 KA unit 4.00 40,414.00 161,656.00
- MCB 1P/10A 6 KA unit 1.00 40,414.00 40,414.00
Penerangan Toilet
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 396,000.00 396,000.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 528,000.00 528,000.00
- Single switch 10 A/ 220V plano unit 8.00 18,700.00 149,600.00
- Double Switch 10 A/ 220V plano unit 2.00 23,100.00 46,200.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 6.00 253,605.40 1,521,632.38
- Kabel NYM 3 x 2,5 mm2 m 200.00 14,300.00 2,860,000.00
- uPVC Conduit 20 m m 75.00 8,635.00 647,625.00
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
Penerangan Ruang Pos Jaga
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 396,000.00 396,000.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 528,000.00 528,000.00
- Single switch 10 A/ 220V plano unit 6.00 18,700.00 112,200.00
- Double Switch 10 A/ 220V plano unit 2.00 23,100.00 46,200.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 4.00 253,605.40 1,014,421.58
- Kabel NYM 3 x 2,5 mm2 m 80.00 14,300.00 1,144,000.00
- uPVC Conduit 20 m m 70.00 8,635.00 604,450.00
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
- Panel Lokal Valve Sedimentasi 0
- Penangkal Petir type Elctrode dengan Rmin = 60m LS 1.00 10,822,650.43 10,822,650.43
- Grounding Anchor Rot 4 meter (3/4) unit 5.00 770,000.00 3,850,000.00
- - NYA 50 mm2 meter 10.00 150,150.00 1,501,500.00
- Clamp Anchor Rot 50 mm2 unit 2.00 16,940.00 33,880.00
- Air terminal Ø 1, termasuk dudukan, komplit set 1.00 686,511.41 686,511.41
- GIP Ø 3 unit 1.00 1,811,040.00 1,811,040.00
- GIP Ø 2 unit 1.00 123,200.00 123,200.00
- Box control 30x30x70 cm unit 1.00 848,043.50 848,043.50
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 807,660.48 807,660.48
- Pengesahan Depnaker LS 1.00 4,620,000.00 4,620,000.00
Jumlah 36,316,745.78

f Pemasangan Elektrikal dan Accesories


Panel Penerangan Pos Jaga (PP-PJ)
- Perakitan dan Pemasangan lengkap termasuk aksesoris set 1.00 807,660.48 807,660.48
- Penerangan Toilet
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 6.00 24,200.00 145,200.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Titik Lampu titik 2.00 72,689.44 145,378.88
Penerangan Ruang Pos Jaga
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 4.00 24,200.00 96,800.00
- Titik Lampu titik 2.00 72,689.44 145,378.88
Jumlah 1,501,898.24
g Pengadaan Lampu penerangan luar
Dari panel PP-LR1
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 2,464,000.00 41,888,000.00
- Tiang lampu hot dip galvanis 6 m set 17.00 2,200,000.00 37,400,000.00
- Kabel NYFGbY 3 x 4 mm2 m 15.00 26,950.00 404,250.00
- Kabel NYFGbY 3 x 2,5 mm2 m 185.00 18,700.00 3,459,500.00
- Kabel NYFGbY 2 x 2,5 mm2 m 100.00 15,950.00 1,595,000.00
- GIP 2" m 6.00 123,200.00 739,200.00
Dari panel PP-LR2
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 2,464,000.00 41,888,000.00
- Tiang lampu hot dip galvanis 6 m set 17.00 2,200,000.00 37,400,000.00
- Kabel NYFGbY 4 x 4 mm2 m 30.00 31,900.00 957,000.00
- Kabel NYFGbY 3 x 4 mm2 m 50.00 26,950.00 1,347,500.00
- Kabel NYFGbY 3 x 2,5 mm2 m 50.00 18,700.00 935,000.00
- Kabel NYFGbY 4 x 2,5 mm2 m 60.00 22,000.00 1,320,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 40.00 15,950.00 638,000.00
Dari panel PP-LR3
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 2,464,000.00 41,888,000.00
- Kabel NYFGbY 3 x 2,5 mm2 m 150.00 18,700.00 2,805,000.00
- Kabel NYFGbY 4 x 4 mm2 m 50.00 31,900.00 1,595,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 220.00 15,950.00 3,509,000.00
- 5. GIP 2" m 6.00 123,200.00 739,200.00
- Tiang lampu hot dip galvanis 6 m set 8.00 2,200,000.00 17,600,000.00
Jumlah 238,107,650.00
h Pemasangan Lampu penerangan luar
Dari panel PP-LR1
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 807,660.48 13,730,228.16
- Kabel NYFGbY 3 x 4 mm2 m 15.00 30,800.00 462,000.00
- Kabel NYFGbY 3 x 2,5 mm2 m 185.00 30,800.00 5,698,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 100.00 30,800.00 3,080,000.00
Dari panel PP-LR2
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 807,660.48 13,730,228.16
- Kabel NYFGbY 4 x 4 mm2 m 30.00 30,800.00 924,000.00
- Kabel NYFGbY 3 x 4 mm2 m 50.00 30,800.00 1,540,000.00
- Kabel NYFGbY 3 x 2,5 mm2 m 50.00 30,800.00 1,540,000.00
- Kabel NYFGbY 4 x 2,5 mm2 m 60.00 30,800.00 1,848,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 40.00 30,800.00 1,232,000.00
Dari panel PP-LR3
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 807,660.48 13,730,228.16
- Kabel NYFGbY 3 x 2,5 mm2 m 150.00 30,800.00 4,620,000.00
- Kabel NYFGbY 4 x 4 mm2 m 50.00 30,800.00 1,540,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 220.00 30,800.00 6,776,000.00
Jumlah 70,450,684.48

BANGUNAN RESERVOIR PANGKUNG PARUK Err:509


Err:509
A BANGUNAN RESERVOIR KAPASITAS 450 M3
1 Pekerjaan Tanah
1 Pengukuran dan Pasang Bowplank m' 62.00 - -
2 Galian Tanah dengan excavator m3 402.38 - -
3 Urugan Tanah Kembali dengan Pemadatan m3 136.85 - -
4 Urugan Pasir t = 10 cm m3 16.44 - -
Jumlah -
2 PEKERJAAN STRUKTUR ATAU SIPIL DAN ASITEKTUR
a Pekerjaan Beton
2 Lantai Kerja K - 125 (1 PC : 3 PS : 5KR)
- Cor Beton Camp 1:3:5 m3 16.44 - -
4 Pekerjaan Sloof
- Beton Cor K-300 m3 6.41 - -
- Pekerjaan Besi Beton Kg 1,640.97 - -
- Begesting Pasangan Batako m2 56.60 - -
5 Pekerjaan Beton Lantai
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Beton Cor K-300 m3 40.58 - -
- besi Beton Kg 6,068.76 - -
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
6 Pekerjaan Beton Kolom
- Beton Cor K-300 m3 6.82 - -
- besi Beton Kg 1,745.60 - -
- Begesting 2 X pakai m2 118.58 - -
7 Pekerjaan Beton Dinding
- Beton Cor K-300 m3 50.69 - -
- besi Beton Kg 5,952.14 - -
- Begesting 2 X pakai m2 506.86 - -
- Pekerjaan Tie Rod pada Bekisting Vertikal m1 397.00 - -
9 Pekerjaan Beton Balok
- Beton Cor K-300 m3 6.00 - -
- besi Beton Kg 1,590.41 - -
- Begesting 2 X pakai m2 83.93 - -
###Pekerjaan Beton Plat Atap
- Beton Cor K-300 m3 16.23 - -
- besi Beton Kg 2,992.03 - -
- Begesting m2 162.33 - -
Jumlah -

b Pekerjaan Pasangan dan Pelapis


###Pekerjaan Pas, Dinding Bata Merah m2 100.80 - -
###Pekerjaan Water Proofing m2 779.69 - -
###Pekerjaan Water Stop m 127.80 - -
###Pekerjaan Plesteran 1 PC : 2 Ps m2 808.51 - -
###Pekerjaan Acian m2 28.82 - -
Jumlah -

c Pekerjaan Kusen Pintu dan Relling


###Pekerjaan Pipa Ventilasi GIP 4" Unit 4.00 750,000.00 3,000,000.00
###Pekerjaan Penutup Man Hole Plat Besi T= 1.2 mm Unit 5.00 Err:509 Err:509
###Pekerjaan Tangga Inspeksi Pipa GIP Unit 4.00 Err:509 Err:509
Pekerjaan Tangga Besi Kg 183.55 - -
Jumlah Err:509

3 PEKERJAAN PIPA DAN ACCESSORIES


Pengadaan
Pipa In Flow Pipa Baja Three layer Polythylene dia.OD 355,6 mm, tebal dind m 53.10 - -
Pipa Over Flow dan Penguras Pipa Baja Three layer Polythylene dia.OD 355 m 57.83 - -
Pipa Out Flow Pipa Baja Three layer Polythylene dia.OD 355,6 mm, tebal di m 55.02 - -
Bend 90° Three Layer Polythelene dia OD 355,6 mm, tebal dinding 5,16 mm bh 7.00 - -
Tee OD 355,6 X 355,6 bh 1.00 - -
Strainer Y OD Ø 355,6 bh 1.00 Err:509 Err:509
AF Gate Valve PN 16 dia. 14'' bh 3.00 - -
Dismantling Joint dia. 14'' bh 3.00 - -
Watermeter dia. 14'' bh 1.00 Err:509 Err:509
End Cap dia. 14'' bh 1.00 - -
Saringan dia. 14'' bh 1.00 3,500,000.00 3,500,000.00
Pemasangan
Pipa In Flow Pipa Baja Three layer Polythylene dia.OD 355,6 mm, tebal dind m 53.10 - -
Pipa Over Flow dan Penguras Pipa Baja Three layer Polythylene dia.OD 355 m 57.83 - -
Pipa Out Flow Pipa Baja Three layer Polythylene dia.OD 355,6 mm, tebal di m 55.02 - -
Bend 90° Three Layer Polythelene dia OD 355,6 mm, tebal dinding 5,16 mm bh 7.00 60,000.00 420,000.00
Tee OD 355,6 X 355,6 bh 1.00 60,000.00 60,000.00
Strainer Y OD Ø 355,6 bh 1.00 60,000.00 60,000.00
AF Gate Valve PN 16 dia. 14'' bh 3.00 60,000.00 180,000.00
Dismantling Joint dia. 14'' bh 3.00 60,000.00 180,000.00
Watermeter dia. 14'' bh 1.00 60,000.00 60,000.00
End Cap dia. 14'' bh 1.00 60,000.00 60,000.00
Saringan dia. 14'' bh 1.00 60,000.00 60,000.00
Jumlah Err:509

9,394,638.00
B POS JAGA
1 PEKERJAAN TANAH
1 Pengukuran dan Pasang Bowplank m' 32.40 - -
2 Galian Tanah dengan excavator m3 23.35 - -
3 Urugan Tanah Kembali dengan Pemadatan m3 10.48 - -
4 Urugan Pasir t = 10 cm m3 1.13 - -
1 Pek. Urugan Tanah Peninggian Lantai m3 1.50 - -
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
2 Pek. Urugan Pasir Lantai Kerja m3 1.07 - -
Jumlah -
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
2 PEKERJAAN STRUKTUR ATAU SIPIL DAN ASITEKTUR
a Pekerjaan Beton
2 Lantai Kerja K - 125 (1 PC : 3 PS : 5KR)
- Cor Beton Camp 1:3:5 m3 1.07 - -
4 Pekerjaan Sloof
- Beton Cor K-300 m3 1.44 - -
- Pekerjaan Besi Beton Kg 163.30 - -
- Begesting Pasangan Batako m2 14.35 - -
6 Pekerjaan Beton Kolom
- Beton Cor K-300 m3 0.96 - -
- besi Beton Kg 193.49 - -
- Begesting 2 X pakai m2 25.51 - -
9 Pekerjaan Beton Balok
- Beton Cor K-300 m3 1.57 - -
- besi Beton Kg 273.81 - -
- Begesting 2 X pakai m2 29.94 - -
9 Pekerjaan Beton Plat Atap
- Beton Cor K-300 m3 1.79 - -
- besi Beton Kg 419.47 - -
- Begesting 1 X pakai m2 14.88 - -
9 Pekerjaan Beton Lisplank
- Beton Cor K-300 m3 0.61 - -
- besi Beton Kg 249.26 - -
- Begesting 2 X pakai m2 13.76 - -
9 Pekerjaan Meja Beton
- Beton Cor K-300 m3 0.10 - -
- besi Beton Kg 25.69 - -
- Begesting 2 X pakai m2 1.95 - -

Jumlah -

b Pekerjaan Pasangan dan Pelapis


Pekerjaan Pasangan Batu Kosong m3 3.40 - -
Pekerjaan Pasangan Batu Kali Camp 1 : 5 m3 9.04 - -
###Pekerjaan Pasangan Bata Camp 1:5 m2 99.88 - -
Pekerjaan Trasram m2 13.68 - -
###Pekerjaan Plesteran 1 PC : 5 PS m2 199.76 - -
###Pekerjaan Acian m2 199.76 - -
Pekerjaan Cat Dinding m2 199.76 - -
1 Pek. Pas. Batu Alam Random m2 13.76 - -
2 Pek. Tempelan Batu Candi m2 30.83 - -
Jumlah -

c Pekerjaan Atap
###Pekerjaan Rangka Kuda-Kuda Atap m3 0.46 - -
###Pekerjaan Usuk dan Reng m2 53.04 - -
###Pekerjaan Pasangan Atap Genteng m2 18.71 - -
Pekerjaan Pas Bubungan m' 22.15 - -
Pekerjaan Pas. Ikut Celedu unit 4.00 - -
Pekerjaan Pas. Murda unit 2.00 - -
Pekerjaan Pas. Listplank m' 19.40 - -
Pekerjaan Pas. Tatab m' 19.72 - -
Pek. Cat Listplank m2 9.70 - -
Jumlah -
d Pekerjaan Langit-Langit
###Pas. Plafond Kasiboard Rangka Hollow m3 21.37 - -
###Pas. List Gypsum m' 37.60 - -
###Pek. Cat Plafond m2 21.37 - -
Jumlah -
e Pekerjaan Penutup Lantai
###Pas.Keramik 30 x 30 cm m2 20.68 - -
###Pas. Keramik 20x30 cm m2 2.25 - -
Pas. Keramik Dinding m2 12.60 - -
###Pas. Stepnozing m' 6.00 - -
Jumlah -
f Pekerjaan Kusen Pintu dan Jendela
###Pas. Kusen Kayu Kamper m3 0.23 - -
###Pas. Daun Pintu Kayu Kamper m2 5.19 - -
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
###Pas. Jendela Kaca m2 1.76 - -
Pas. Kaca Bening t = 5 mm m2 0.78 - -
###Pas. Engsel Pintu set 6.00 - -
Pas. Grendel Pintu unit 2.00 - -
###Pas. Handle & Kunci Pintu m' 2.00 - -
Pas. Engsel Jendela unit 8.00 - -
Pas. Grendel Jendela unit 4.00 - -
Pas. Kait Angin unit 8.00 - -
Pek. Polituran m2 28.50 - -
Jumlah -
g Pekerjaan Toilet
1 Instalasi Plumbing Air Bersih m 25.00 42,900.00 1,072,500.00
2 Instalasi Plumbing Air Kotor m 36.00 231,170.50 8,322,138.00
3 Closet duduk bh 1.00 - -
4 Pasang Washtafel set 1.00 - -
5 Pasang Floor Drain set 1.00 - -
6 Pasang Kran air set 2.00 - -
Pekerjaan Septiktank unit 1.00 - -
Pekerjaan Peresapan unit 1.00 - -
Jumlah 9,394,638.00

-
C PAGAR
Pengukuran dan Pasang Bowplank m' 80.60 - -
Galian Tanah dengan excavator m3 20.55 - -
Urugan Tanah Kembali dengan Pemadatan m3 21.28 - -
Urugan Pasir t = 10 cm m3 1.21 - -
Pekerjaan Pasangan Batu Kosong m3 3.63 - -
Pekerjaan Pasangan Batu Kali Camp 1 : 5 m3 13.30 - -
Pekerjaan Sloof
- Beton Cor K-300 m3 4.04 - -
- Pekerjaan Besi Beton Kg 447.67 - -
- Begesting 2 X pakai m2 40.35 - -
Pekerjaan Beton Kolom
- Beton Cor K-300 m3 4.04 - -
- besi Beton Kg 447.67 - -
- Begesting 2 X pakai m2 40.35 - -
Pekerjaan Beton Balok
- Beton Cor K-300 m3 1.28 - -
- besi Beton Kg 225.79 - -
- Begesting 2 X pakai m2 34.20 - -
###Pekerjaan Pasangan Bata Camp 1:5 m2 112.84 - -
###Pekerjaan Plesteran 1 PC : 5 PS m2 374.79 - -
###Pekerjaan Acian m2 374.79 - -
Pekerjaan Paving t=8 mm, K225 m2 208.20 - -
Jumlah -
1,029,662,779.71
D PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
a Pengadaan mekanikal dan aksesoris
Perpipaan Inlet
- Ø 350 mm Steel pipe SCH.40 unit 21.00 3,363,656.73 70,636,791.23
- Ø 350 mm Flange las unit 4.00 4,040,278.00 16,161,112.00
- Ø 350 mm x 90 Steel Bend fl - fl unit 4.00 2,956,800.00 11,827,200.00
- Ø 350 mm x 0,60 m' Double fl - fl ( Wall pipa ) m 1.00 6,215,638.00 6,215,638.00
- Ø 350 mm Karet Packing unit 7.00 62,315.00 436,205.00
- M24 Baut mur unit 64.00 44,187.00 2,827,968.00
Perpipaan Outlet
- Ø 300 mm x 0,60 m' Double fl - fl ( Wall pipa ) unit 2.00 3,687,800.60 7,375,601.20
- Ø 300 mm Steel pipe SCH.40 m' 3.00 2,598,676.66 7,796,029.99
- Ø 300 mm DI Gate Valve metal resilient Seated all flange unit 1.00 27,806,142.65 27,806,142.65
- Ø 300 mm Dismantling Joint/Adaptor unit 1.00 3,047,616.00 3,047,616.00
- Ø 300 mm Water meter unit 1.00 6,548,850.00 6,548,850.00
- Ø 300 mm Strainer unit 1.00 4,621,848.00 4,621,848.00
- Ø 300 mm Saringan unit 1.00 4,086,720.00 4,086,720.00
- Ø 300 mm x 90 Steel Bend fl - fl unit 1.00 1,927,124.23 1,927,124.23
- Ø 300 mm Flange las unit 12.00 3,404,257.12 40,851,085.44
- Ø 300 mm Karet Packing unit 13.00 45,320.00 589,160.00
- M24 Baut mur set 192.00 44,187.00 8,483,904.00
Perpipaan Drain dan Overflow
- Ø 350 mm x 0,60 m' Double fl - fl ( Wall pipa ) unit 1.00 6,215,638.00 6,215,638.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Ø 300 mm x 0,60 m' Double fl - fl ( Wall pipa ) unit 2.00 3,687,800.60 7,375,601.20
- Ø 350 mm Steel pipe SCH.40 m' 4.00 3,363,656.73 13,454,626.90
- Ø 300 mm Steel pipe SCH.40 m' 3.00 2,598,676.66 7,796,029.99
- Ø 350 mm DI Gate Valve metal resilient Seated all flange unit 1.00 29,960,409.60 29,960,409.60
- Ø 350 mm Dismantling Joint/Adaptor unit 1.00 3,535,294.40 3,535,294.40
- Ø 350 mm x Ø 300 mm Tee steel unit 1.00 3,843,840.00 3,843,840.00
- Ø 350 mm x 90 Steel Bend fl - fl unit 2.00 2,956,800.00 5,913,600.00
- Ø 300 mm x 90 Steel Bend fl - fl unit 1.00 1,927,124.23 1,927,124.23
- Ø 350 mm Flange las unit 10.00 4,040,278.00 40,402,780.00
- Ø 300 mm Flange las unit 5.00 3,404,257.12 17,021,285.60
- Ø 300 mm Karet Packing unit 10.00 45,320.00 453,200.00
- Ø 350 mm Karet Packing unit 5.00 62,315.00 311,575.00
- M24 Baut mur set 240.00 44,187.00 10,604,880.00
- Manhole plat besi T=1.2 MM unit 3.00 1,706,292.50 5,118,877.50
- Pipa Vent unit 3.00 286,000.00 858,000.00
- Ø 50 mm pipa Drainase PVC m 2.00 101,062.50 202,125.00
Jumlah 376,233,883.16

b Pemasangan mekanikal dan aksesoris


Perpipaan Inlet
- Ø 350 mm Steel pipe SCH.40 unit 21.00 21,896.31 459,822.59
- Ø 350 mm Flange las unit 4.00 521,723.13 2,086,892.50
- Ø 350 mm x 90 Steel Bend fl - fl unit 4.00 99,253.00 397,012.00
- Ø 350 mm x 0,60 m' Double fl - fl ( Wall pipa ) m 1.00 129,910.00 129,910.00
- Ø 350 mm Karet Packing unit 7.00 1,561.66 10,931.59
- M24 Baut mur unit 64.00 892.38 57,112.00
Perpipaan Outlet
- Ø 300 mm x 0,60 m' Double fl - fl ( Wall pipa ) unit 2.00 136,620.00 273,240.00
- Ø 300 mm Steel pipe SCH.40 m' 3.00 196,303.35 588,910.05
- Ø 300 mm DI Gate Valve metal resilient Seated all flange unit 1.00 215,176.50 215,176.50
- Ø 300 mm Dismantling Joint/Adaptor unit 1.00 214,901.50 214,901.50
- Ø 300 mm Water meter unit 1.00 214,901.50 214,901.50
- Ø 300 mm Strainer unit 1.00 129,827.50 129,827.50
- Ø 300 mm Saringan unit 1.00 129,827.50 129,827.50
- Ø 300 mm x 90 Steel Bend fl - fl unit 1.00 136,620.00 136,620.00
- Ø 300 mm Flange las unit 12.00 521,723.13 6,260,677.50
- Ø 300 mm Karet Packing unit 13.00 1,561.66 20,301.53
- M24 Baut mur set 192.00 892.38 171,336.00
Perpipaan Drain dan Overflow
- Ø 350 mm x 0,60 m' Double fl - fl ( Wall pipa ) unit 1.00 129,910.00 129,910.00
- Ø 300 mm x 0,60 m' Double fl - fl ( Wall pipa ) unit 2.00 136,620.00 273,240.00
- Ø 350 mm Steel pipe SCH.40 m' 4.00 21,896.31 87,585.26
- Ø 300 mm Steel pipe SCH.40 m' 3.00 196,303.35 588,910.05
- Ø 350 mm DI Gate Valve metal resilient Seated all flange unit 1.00 215,176.50 215,176.50
- Ø 350 mm Dismantling Joint/Adaptor unit 1.00 104,489.00 104,489.00
- Ø 350 mm x Ø 300 mm Tee steel unit 1.00 521,723.13 521,723.13
- Ø 350 mm x 90 Steel Bend fl - fl unit 2.00 99,253.00 198,506.00
- Ø 300 mm x 90 Steel Bend fl - fl unit 1.00 136,620.00 136,620.00
- Ø 350 mm Flange las unit 10.00 521,723.13 5,217,231.25
- Ø 300 mm Flange las unit 5.00 521,723.13 2,608,615.63
- Ø 300 mm Karet Packing unit 10.00 1,561.66 15,616.56
- Ø 350 mm Karet Packing unit 5.00 1,561.66 7,808.28
- M24 Baut mur set 240.00 892.38 214,170.00
- Manhole plat besi T=1.2 MM unit 3.00 93,749.59 281,248.77
- Pipa Vent unit 3.00 44,187.00 132,561.00
- Ø 50 mm pipa Drainase PVC m 2.00 44,187.00 88,374.00
Jumlah 22,319,185.68
c Pengadaan Elektrikal dan Accesories 0
Panel Penerangan Pos Jaga (PP-PJ) 0
- Box Plastic mini pragma pintu tranparant, inbow, 12 modul Unit 1.00 186,780.00 186,780.00
- MCB 3P/16A 10 KA unit 1.00 190,129.50 190,129.50
- RCCB/ELCB, 4P, 25A, Sensitifitas : 30 mA unit 1.00 568,551.50 568,551.50
- MCB 1P/6A 6 KA unit 4.00 40,414.00 161,656.00
- MCB 1P/10A 6 KA unit 1.00 40,414.00 40,414.00
- Box plastic mini pragma pintu transparant, inbow, 12 modul unit 1.00 308,000.00 308,000.00
- MCB 1P/16A 6 KA unit 1.00 200,200.00 200,200.00
- RCCB/ELCB, 2P, 16A, Sensitifitas : 30 mA unit 1.00 1,074,150.00 1,074,150.00
- MCB 1P/4A 6 KA unit 6.00 161,700.00 970,200.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 807,660.48 807,660.48
Penerangan Ruang Pos Jaga 0
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 396,000.00 396,000.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 528,000.00 528,000.00
- Single switch 10 A/ 220V plano unit 6.00 18,700.00 112,200.00
- Double Switch 10 A/ 220V plano unit 2.00 23,100.00 46,200.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 4.00 253,605.40 1,014,421.58
- Kabel NYM 3 x 2,5 mm2 m 80.00 14,300.00 1,144,000.00
- uPVC Conduit 20 m m 70.00 8,635.00 604,450.00
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
- Lampu TL 2 X 18W/WP unit 9.00 65,450.00 589,050.00
- Lampu jalan 50 W /SINGEL unit 12.00 513,128.00 6,157,536.00
- Outlet 10 A/2P+E 220V unit 6.00 170,940.00 1,025,640.00
- Single switch 10 A/ 220V plano unit 6.00 18,700.00 112,200.00
- Kabel dari P. Penerangan ke PJU
- - NYFGBY 3 x 2,5 mm2 meter 280.00 43,274.00 12,116,720.00
- Kabel dari P. Penerangan ke Lampu Taman
- - NYFGBY 3 x 2,5 mm2 meter 130.00 43,274.00 5,625,620.00
- Kabel dari P. Penerangan ke lampu stop kontak Penguras
- - NYFGBY 3 x 2,5 mm2 meter 90.00 43,274.00 3,894,660.00
- Junction Box untuk kabel NYFGBY ke NYM unit 1.00 1,099,560.00 1,099,560.00
- Instalasi titik lampu titik 15.00 589,050.00 8,835,750.00
- Instalasi titik lampu jalan titik 12.00 589,050.00 7,068,600.00
- Instalasi stop kontak titik 6.00 392,700.00 2,356,200.00
Jumlah 57,269,749.06
d Pemasangan Elektrikal dan Accesories 0
Panel Penerangan Pos Jaga (PP-PJ) 0
- Perakitan dan Pemasangan lengkap termasuk aksesoris set 1.00 807,660.48 807,660.48
Penerangan Ruang Pos Jaga 0
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 4.00 24,200.00 96,800.00
- Titik Lampu titik 2.00 72,689.44 145,378.88
Penyambungan Listrik PLN 0
- Uang Jaminan Pelanggan VA 4,400.00 272.25 1,197,900.00
- Biaya penyambungan VA 4,400.00 555.50 2,444,200.00
- Biaya installatir termasuk Sertifikasi Laik Operasi VA 4,400.00 145.20 638,880.00
- Biaya konstruksi dan peralatan penunjang LS 1.00 226,671,423.94 226,671,423.94
Jumlah 232,082,983.30

e Pengadaan Elektrikal dan Accesories


Panel Penerangan Pos Jaga (PP-PJ)
- Box Plastic mini pragma pintu tranparant, inbow, 12 modul Unit 1.00 186,780.00 186,780.00
- MCB 3P/16A 10 KA unit 1.00 190,129.50 190,129.50
- RCCB/ELCB, 4P, 25A, Sensitifitas : 30 mA unit 1.00 568,551.50 568,551.50
- MCB 1P/6A 6 KA unit 4.00 40,414.00 161,656.00
- MCB 1P/10A 6 KA unit 1.00 40,414.00 40,414.00
Penerangan Toilet
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 396,000.00 396,000.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 528,000.00 528,000.00
- Single switch 10 A/ 220V plano unit 8.00 18,700.00 149,600.00
- Double Switch 10 A/ 220V plano unit 2.00 23,100.00 46,200.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 6.00 253,605.40 1,521,632.38
- Kabel NYM 3 x 2,5 mm2 m 200.00 14,300.00 2,860,000.00
- uPVC Conduit 20 m m 75.00 8,635.00 647,625.00
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
Penerangan Ruang Pos Jaga
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 396,000.00 396,000.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 528,000.00 528,000.00
- Single switch 10 A/ 220V plano unit 6.00 18,700.00 112,200.00
- Double Switch 10 A/ 220V plano unit 2.00 23,100.00 46,200.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 4.00 253,605.40 1,014,421.58
- Kabel NYM 3 x 2,5 mm2 m 80.00 14,300.00 1,144,000.00
- uPVC Conduit 20 m m 70.00 8,635.00 604,450.00
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
- Panel Lokal Valve Sedimentasi 0
- Penangkal Petir type Elctrode dengan Rmin = 60m LS 1.00 10,822,650.43 10,822,650.43
- Grounding Anchor Rot 4 meter (3/4) unit 5.00 770,000.00 3,850,000.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- - NYA 50 mm2 meter 10.00 150,150.00 1,501,500.00
- Clamp Anchor Rot 50 mm2 unit 2.00 16,940.00 33,880.00
- Air terminal Ø 1, termasuk dudukan, komplit set 1.00 686,511.41 686,511.41
- GIP Ø 3 unit 1.00 1,811,040.00 1,811,040.00
- GIP Ø 2 unit 1.00 123,200.00 123,200.00
- Box control 30x30x70 cm unit 1.00 848,043.50 848,043.50
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 807,660.48 807,660.48
Jumlah 31,696,745.78

f Pemasangan Elektrikal dan Accesories


Panel Penerangan Pos Jaga (PP-PJ)
- Perakitan dan Pemasangan lengkap termasuk aksesoris set 1.00 807,660.48 807,660.48
- Penerangan Toilet
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 6.00 24,200.00 145,200.00
- Titik Lampu titik 2.00 72,689.44 145,378.88
Penerangan Ruang Pos Jaga
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 4.00 24,200.00 96,800.00
- Titik Lampu titik 2.00 72,689.44 145,378.88
Jumlah 1,501,898.24
g Pengadaan Lampu penerangan luar
Dari panel PP-LR1
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 2,464,000.00 41,888,000.00
- Tiang lampu hot dip galvanis 6 m set 17.00 2,200,000.00 37,400,000.00
- Kabel NYFGbY 3 x 4 mm2 m 15.00 26,950.00 404,250.00
- Kabel NYFGbY 3 x 2,5 mm2 m 185.00 18,700.00 3,459,500.00
- Kabel NYFGbY 2 x 2,5 mm2 m 100.00 15,950.00 1,595,000.00
- GIP 2" m 6.00 123,200.00 739,200.00
Dari panel PP-LR2
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 2,464,000.00 41,888,000.00
- Tiang lampu hot dip galvanis 6 m set 17.00 2,200,000.00 37,400,000.00
- Kabel NYFGbY 4 x 4 mm2 m 30.00 31,900.00 957,000.00
- Kabel NYFGbY 3 x 4 mm2 m 50.00 26,950.00 1,347,500.00
- Kabel NYFGbY 3 x 2,5 mm2 m 50.00 18,700.00 935,000.00
- Kabel NYFGbY 4 x 2,5 mm2 m 60.00 22,000.00 1,320,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 40.00 15,950.00 638,000.00
Dari panel PP-LR3
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 2,464,000.00 41,888,000.00
- Kabel NYFGbY 3 x 2,5 mm2 m 150.00 18,700.00 2,805,000.00
- Kabel NYFGbY 4 x 4 mm2 m 50.00 31,900.00 1,595,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 220.00 15,950.00 3,509,000.00
- 5. GIP 2" m 6.00 123,200.00 739,200.00
- Tiang lampu hot dip galvanis 6 m set 8.00 2,200,000.00 17,600,000.00
Jumlah 238,107,650.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
h Pemasangan Lampu penerangan luar
Dari panel PP-LR1
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 807,660.48 13,730,228.16
- Kabel NYFGbY 3 x 4 mm2 m 15.00 30,800.00 462,000.00
- Kabel NYFGbY 3 x 2,5 mm2 m 185.00 30,800.00 5,698,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 100.00 30,800.00 3,080,000.00
Dari panel PP-LR2
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 807,660.48 13,730,228.16
- Kabel NYFGbY 4 x 4 mm2 m 30.00 30,800.00 924,000.00
- Kabel NYFGbY 3 x 4 mm2 m 50.00 30,800.00 1,540,000.00
- Kabel NYFGbY 3 x 2,5 mm2 m 50.00 30,800.00 1,540,000.00
- Kabel NYFGbY 4 x 2,5 mm2 m 60.00 30,800.00 1,848,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 40.00 30,800.00 1,232,000.00
Dari panel PP-LR3
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 807,660.48 13,730,228.16
- Kabel NYFGbY 3 x 2,5 mm2 m 150.00 30,800.00 4,620,000.00
- Kabel NYFGbY 4 x 4 mm2 m 50.00 30,800.00 1,540,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 220.00 30,800.00 6,776,000.00
Jumlah 70,450,684.48

BANGUNAN RESERVOIR LOKAPAKSA Err:509


Err:509
A BANGUNAN RESERVOIR KAPASITAS 750 M3
1 PEKERJAAN TANAH
1 Pengukuran dan Pasang Bowplank m' 88.10 - -
2 Galian Tanah dengan excavator m3 603.04 - -
3 Urugan Tanah Kembali dengan Pemadatan m3 79.29 - -
4 Urugan Pasir t = 10 cm m3 31.63 - -
Jumlah -
2 PEKERJAAN STRUKTUR ATAU SIPIL DAN ASITEKTUR
a Pekerjaan Beton
2 Lantai Kerja K - 125 (1 PC : 3 PS : 5KR)
- Cor Beton Camp 1:3:5 m3 31.63 - -
4 Pekerjaan Sloof
- Beton Cor K-300 m3 12.34 - -
- Pekerjaan Besi Beton Kg 3,035.25 - -
- Begesting Pasangan Batako m2 106.08 - -
5 Pekerjaan Beton Lantai
- Beton Cor K-300 m3 78.56 - -
- besi Beton Kg 11,603.88 - -
6 Pekerjaan Beton Kolom
- Beton Cor K-300 m3 9.78 - -
- besi Beton Kg 2,501.26 - -
- Begesting 2 X pakai m2 171.38 - -
7 Pekerjaan Beton Dinding
- Beton Cor K-300 m3 59.76 - -
- besi Beton Kg 6,827.74 - -
- Begesting 2 X pakai m2 597.64 - -
- Pekerjaan Tie Rod pada Bekisting Vertikal m1 468.00 - -
9 Pekerjaan Beton Balok
- Beton Cor K-300 m3 10.94 - -
- besi Beton Kg 2,865.43 - -
- Begesting 2 X pakai m2 153.20 - -
###Pekerjaan Beton Plat Atap
- Beton Cor K-300 m3 31.43 - -
- besi Beton Kg 5,803.29 - -
- Begesting m2 314.26 - -
Jumlah -

b Pekerjaan Pasangan dan Pelapis


###Pekerjaan Pas, Dinding Bata Merah m2 142.80 - -
###Pekerjaan Water Proofing m2 1,212.93 - -
###Pekerjaan Water Stop m 299.20 - -
###Pekerjaan Plesteran 1 PC : 2 Ps m2 1,258.23 - -
###Pekerjaan Acian m2 45.30 - -
Jumlah -

c Pekerjaan Kusen dan Relling


HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
###Pekerjaan Pipa Ventilasi GIP 4" Unit 4.00 750,000.00 3,000,000.00
###Pekerjaan Penutup Man Hole Plat Besi T= 1.2 mm Unit 5.00 Err:509 Err:509
###Pekerjaan Tangga Inspeksi Pipa GIP Unit 4.00 Err:509 Err:509
###Railling Balkon dan Tangga (Pipa Black Steel) m' Err:509
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
Pekerjaan Tangga Besi Kg 183.55 - -
Jumlah Err:509
3 PEKERJAAN PIPA DAN ACCESSORIES
Pengadaan
Pipa In Flow Pipa Baja Three layer Polythylene dia.OD 355,6 mm, tebal dind m 53.10 - -
Pipa Over Flow dan Penguras Pipa Baja Three layer Polythylene dia.OD 355 m 57.83 - -
Pipa Out Flow Pipa Baja Three layer Polythylene dia.OD 355,6 mm, tebal di m 55.02 - -
Bend 90° Three Layer Polythelene dia OD 355,6 mm, tebal dinding 5,16 mm bh 7.00 - -
Tee OD 355,6 X 355,6 bh 1.00 - -
Strainer Y OD Ø 355,6 bh 1.00 Err:509 Err:509
AF Gate Valve PN 16 dia. 14'' bh 3.00 - -
Dismantling Joint dia. 14'' bh 3.00 - -
Watermeter dia. 14'' bh 1.00 Err:509 Err:509
Saringan dia. 14'' bh 1.00 3,500,000.00 3,500,000.00
Pemasangan
Pipa In Flow Pipa Baja Three layer Polythylene dia.OD 355,6 mm, tebal dind m 53.10 - -
Pipa Over Flow dan Penguras Pipa Baja Three layer Polythylene dia.OD 355 m 57.83 - -
Pipa Out Flow Pipa Baja Three layer Polythylene dia.OD 355,6 mm, tebal di m 55.02 - -
Bend 90° Three Layer Polythelene dia OD 355,6 mm, tebal dinding 5,16 mm bh 7.00 60,000.00 420,000.00
Tee OD 355,6 X 355,6 bh 1.00 60,000.00 60,000.00
Strainer Y OD Ø 355,6 bh 1.00 60,000.00 60,000.00
AF Gate Valve PN 16 dia. 14'' bh 3.00 60,000.00 180,000.00
Dismantling Joint dia. 14'' bh 3.00 60,000.00 180,000.00
Watermeter dia. 14'' bh 1.00 60,000.00 60,000.00
Saringan dia. 14'' bh 1.00 60,000.00 60,000.00
Jumlah Err:509

9,394,638.00
B POS JAGA
1 PEKERJAAN TANAH
1 Pengukuran dan Pasang Bowplank m' 32.40 - -
2 Galian Tanah dengan excavator m3 23.35 - -
3 Urugan Tanah Kembali dengan Pemadatan m3 10.48 - -
4 Urugan Pasir t = 10 cm m3 1.13 - -
1 Pek. Urugan Tanah Peninggian Lantai m3 1.50 - -
2 Pek. Urugan Pasir Lantai Kerja m3 1.07 - -
Jumlah -
2 PEKERJAAN STRUKTUR ATAU SIPIL DAN ASITEKTUR
a Pekerjaan Beton
2 Lantai Kerja K - 125 (1 PC : 3 PS : 5KR)
- Cor Beton Camp 1:3:5 m3 1.07 - -
4 Pekerjaan Sloof
- Beton Cor K-300 m3 1.44 - -
- Pekerjaan Besi Beton Kg 163.30 - -
- Begesting Pasangan Batako m2 14.35 - -
6 Pekerjaan Beton Kolom
- Beton Cor K-300 m3 0.96 - -
- besi Beton Kg 193.49 - -
- Begesting 2 X pakai m2 25.51 - -
9 Pekerjaan Beton Balok
- Beton Cor K-300 m3 1.57 - -
- besi Beton Kg 273.81 - -
- Begesting 2 X pakai m2 29.94 - -
9 Pekerjaan Beton Plat Atap
- Beton Cor K-300 m3 1.79 - -
- besi Beton Kg 419.47 - -
- Begesting 1 X pakai m2 14.88 - -
9 Pekerjaan Beton Lisplank
- Beton Cor K-300 m3 0.61 - -
- besi Beton Kg 249.26 - -
- Begesting 2 X pakai m2 13.76 - -
9 Pekerjaan Meja Beton
- Beton Cor K-300 m3 0.10 - -
- besi Beton Kg 25.69 - -
- Begesting 2 X pakai m2 1.95 - -

Jumlah -

b Pekerjaan Pasangan dan Pelapis


HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
Pekerjaan Pasangan Batu Kosong m3 3.40 - -
Pekerjaan Pasangan Batu Kali Camp 1 : 5 m3 9.04 - -
###Pekerjaan Pasangan Bata Camp 1:5 m2 99.88 - -
Pekerjaan Trasram m2 13.68 - -
###Pekerjaan Plesteran 1 PC : 5 PS m2 199.76 - -
###Pekerjaan Acian m2 199.76 - -
Pekerjaan Cat Dinding m2 199.76 - -
1 Pek. Pas. Batu Alam Random m2 13.76 - -
2 Pek. Tempelan Batu Candi m2 30.83 - -
Jumlah -

c Pekerjaan Atap
###Pekerjaan Rangka Kuda-Kuda Atap m3 0.46 - -
###Pekerjaan Usuk dan Reng m2 53.04 - -
###Pekerjaan Pasangan Atap Genteng m2 18.71 - -
Pekerjaan Pas Bubungan m' 22.15 - -
Pekerjaan Pas. Ikut Celedu unit 4.00 - -
Pekerjaan Pas. Murda unit 2.00 - -
Pekerjaan Pas. Listplank m' 19.40 - -
Pekerjaan Pas. Tatab m' 19.72 - -
Pek. Cat Listplank m2 9.70 - -
Jumlah -
d Pekerjaan Langit-Langit
###Pas. Plafond Kasiboard Rangka Hollow m3 21.37 - -
###Pas. List Gypsum m' 37.60 - -
###Pek. Cat Plafond m2 21.37 - -
Jumlah -
e Pekerjaan Penutup Lantai
###Pas.Keramik 30 x 30 cm m2 20.68 - -
###Pas. Keramik 20x30 cm m2 2.25 - -
Pas. Keramik Dinding m2 12.60 - -
###Pas. Stepnozing m' 6.00 - -
Jumlah -
f Pekerjaan Kusen Pintu dan Jendela
###Pas. Kusen Kayu Kamper m3 0.23 - -
###Pas. Daun Pintu Kayu Kamper m2 5.19 - -
###Pas. Jendela Kaca m2 1.76 - -
Pas. Kaca Bening t = 5 mm m2 0.78 - -
###Pas. Engsel Pintu set 6.00 - -
Pas. Grendel Pintu unit 2.00 - -
###Pas. Handle & Kunci Pintu m' 2.00 - -
Pas. Engsel Jendela unit 8.00 - -
Pas. Grendel Jendela unit 4.00 - -
Pas. Kait Angin unit 8.00 - -
Pek. Polituran m2 28.50 - -
Jumlah -
g Pekerjaan Toilet
1 Instalasi Plumbing Air Bersih m 25.00 42,900.00 1,072,500.00
2 Instalasi Plumbing Air Kotor m 36.00 231,170.50 8,322,138.00
3 Closet duduk bh 1.00 - -
4 Pasang Washtafel set 1.00 - -
5 Pasang Floor Drain set 1.00 - -
6 Pasang Kran air set 2.00 - -
Pekerjaan Septiktank unit 1.00 - -
Pekerjaan Peresapan unit 1.00 - -
Jumlah 9,394,638.00

-
C PAGAR
Pengukuran dan Pasang Bowplank m' 70.60 - -
Galian Tanah dengan excavator m3 18.00 - -
Urugan Tanah Kembali dengan Pemadatan m3 18.64 - -
Urugan Pasir t = 10 cm m3 1.06 - -
Pekerjaan Pasangan Batu Kosong m3 3.18 - -
Pekerjaan Pasangan Batu Kali Camp 1 : 5 m3 11.65 - -
Pekerjaan Sloof
- Beton Cor K-300 m3 3.54 - -
- Pekerjaan Besi Beton Kg 392.24 - -
- Begesting 2 X pakai m2 35.35 - -
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
Pekerjaan Beton Kolom
- Beton Cor K-300 m3 3.54 - -
- besi Beton Kg 392.24 - -
- Begesting 2 X pakai m2 35.35 - -
Pekerjaan Beton Balok
- Beton Cor K-300 m3 1.03 - -
- besi Beton Kg 180.63 - -
- Begesting 2 X pakai m2 27.36 - -
###Pekerjaan Pasangan Bata Camp 1:5 m2 98.84 - -
###Pekerjaan Plesteran 1 PC : 5 PS m2 328.29 - -
###Pekerjaan Acian m2 328.29 - -
Pekerjaan Paving t=8 mm, K225 m2 299.00 - -
Jumlah -

1,167,314,888.51
D PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
a Pengadaan mekanikal dan aksesoris
Perpipaan Inlet
- Ø 500 mm Steel pipe SCH.40 m 21.00 2,788,646.66 58,561,579.92
- Ø 500 mm Flange las unit 4.00 4,311,014.40 17,244,057.60
- Ø 500 mm x 90 Steel Bend fl - fl unit 4.00 6,177,600.00 24,710,400.00
- Ø 500 mm x 0,60 m' Double fl - fl ( Wall pipa ) unit 1.00 10,348,800.00 10,348,800.00
- Ø 500 mm Karet Packing unit 7.00 42,988.00 300,916.00
- M30 Baut mur set 80.00 51,036.70 4,082,936.00
Perpipaan Outlet
- Ø 450 mm x 0,60 m' Double fl - fl ( Wall pipa ) unit 2.00 7,814,400.00 15,628,800.00
- Ø 450 mm Steel pipe SCH.40 m' 2.00 5,461,532.98 10,923,065.96
- Ø 450 mm DI Gate Valve metal resilient Seated all flange unit 1.00 82,637,280.00 82,637,280.00
- Ø 450 mm Dismantling Joint/Adaptor unit 1.00 6,364,705.60 6,364,705.60
- Ø 450 mm Water meter unit 1.00 14,747,535.00 14,747,535.00
- Ø 450 mm Strainer unit 1.00 10,014,312.00 10,014,312.00
- Ø 450 mm Saringan unit 1.00 14,747,535.00 14,747,535.00
- Ø 450 mm x 90 Steel Bend fl - fl unit 1.00 4,951,964.16 4,951,964.16
- Ø 450 mm Flange las unit 12.00 3,403,532.00 40,842,384.00
- Ø 450 mm Karet Packing unit 13.00 35,816.00 465,608.00
- M30 Baud mur set 240.00 51,036.70 12,248,808.00
Perpipaan Drain dan Overflow
- Ø 450 mm x 0,60 m' Double fl - fl ( Wall pipa ) unit 1.00 7,814,400.00 7,814,400.00
- Ø 350 mm x 0,60 m' Double fl - fl ( Wall pipa ) unit 2.00 6,215,638.00 12,431,276.00
- Ø 450 mm Steel pipe SCH.40 m' 4.00 5,461,532.98 21,846,131.91
- Ø 350 mm Steel pipe SCH.40 m' 3.00 3,363,656.73 10,090,970.18
- Ø 350 mm DI Gate Valve metal resilient Seated all flange unit 1.00 29,960,409.60 29,960,409.60
- Ø 350 mm Dismantling Joint/Adaptor unit 1.00 3,535,294.40 3,535,294.40
- Ø 350 mm x Ø 450 mm Tee steel unit 1.00 2,956,800.00 2,956,800.00
- Ø 450 mm x 90 Steel Bend fl - fl unit 2.00 4,951,964.16 9,903,928.32
- Ø 350 mm x 90 Steel Bend fl - fl unit 1.00 2,956,800.00 2,956,800.00
- Ø 450 mm Flange las unit 10.00 3,403,532.00 34,035,320.00
- Ø 350 mm Flange las unit 5.00 4,040,278.00 20,201,390.00
- Ø 450 mm Karet Packing unit 10.00 35,816.00 358,160.00
- Ø 350 mm Karet Packing unit 5.00 62,315.00 311,575.00
- M30 Baut mur set 300.00 51,036.70 15,311,010.00
- Manhole plat besi T=1.2 MM unit 3.00 1,706,292.50 5,118,877.50
- Pipa Vent unit 3.00 286,000.00 858,000.00
- Ø 50 mm pipa Drainase PVC m 2.00 101,062.50 202,125.00
Jumlah 506,713,155.15

b Pemasangan mekanikal dan aksesoris


Perpipaan Inlet
- Ø 500 mm Steel pipe SCH.40 m 21.00 33,163.22 696,427.58
- Ø 500 mm Flange las unit 4.00 845,607.82 3,382,431.27
- Ø 500 mm x 90 Steel Bend fl - fl unit 4.00 113,300.00 453,200.00
- Ø 500 mm x 0,60 m' Double fl - fl ( Wall pipa ) unit 1.00 139,975.00 139,975.00
- Ø 500 mm Karet Packing unit 7.00 1,561.66 10,931.59
- M30 Baut mur set 80.00 892.38 71,390.00
Perpipaan Outlet
- Ø 450 mm x 0,60 m' Double fl - fl ( Wall pipa ) unit 2.00 139,975.00 279,950.00
- Ø 450 mm Steel pipe SCH.40 m' 2.00 22,988.58 45,977.16
- Ø 450 mm DI Gate Valve metal resilient Seated all flange unit 1.00 215,336.00 215,336.00
- Ø 450 mm Dismantling Joint/Adaptor unit 1.00 104,489.00 104,489.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Ø 450 mm Water meter unit 1.00 129,827.50 129,827.50
- Ø 450 mm Strainer unit 1.00 129,827.50 129,827.50
- Ø 450 mm Saringan unit 1.00 86,102.50 86,102.50
- Ø 450 mm x 90 Steel Bend fl - fl unit 1.00 101,640.00 101,640.00
- Ø 450 mm Flange las unit 12.00 680,927.50 8,171,130.00
- Ø 450 mm Karet Packing unit 13.00 1,561.66 20,301.53
- M30 Baud mur set 240.00 892.38 214,170.00
Perpipaan Drain dan Overflow
- Ø 450 mm x 0,60 m' Double fl - fl ( Wall pipa ) unit 1.00 139,975.00 139,975.00
- Ø 350 mm x 0,60 m' Double fl - fl ( Wall pipa ) unit 2.00 129,910.00 259,820.00
- Ø 450 mm Steel pipe SCH.40 m' 4.00 22,988.58 91,954.32
- Ø 350 mm Steel pipe SCH.40 m' 3.00 196,303.35 588,910.05
- Ø 350 mm DI Gate Valve metal resilient Seated all flange unit 1.00 215,176.50 215,176.50
- Ø 350 mm Dismantling Joint/Adaptor unit 1.00 215,176.50 215,176.50
- Ø 350 mm x Ø 450 mm Tee steel unit 1.00 99,253.00 99,253.00
- Ø 450 mm x 90 Steel Bend fl - fl unit 2.00 129,827.50 259,655.00
- Ø 350 mm x 90 Steel Bend fl - fl unit 1.00 129,827.50 129,827.50
- Ø 450 mm Flange las unit 10.00 521,723.13 5,217,231.25
- Ø 350 mm Flange las unit 5.00 521,723.13 2,608,615.63
- Ø 450 mm Karet Packing unit 10.00 1,561.66 15,616.56
- Ø 350 mm Karet Packing unit 5.00 1,561.66 7,808.28
- M30 Baut mur set 300.00 892.38 267,712.50
- Manhole plat besi T=1.2 MM unit 3.00 93,749.59 281,248.77
- Pipa Vent unit 3.00 44,187.00 132,561.00
- Ø 50 mm pipa Drainase PVC m 2.00 44,187.00 88,374.00
Jumlah 24,872,022.50
c Pengadaan Elektrikal dan Accesories
Panel Penerangan Pos Jaga (PP-PJ)
- Box Plastic mini pragma pintu tranparant, inbow, 12 modul Unit 1.00 186,780.00 186,780.00
- MCB 3P/16A 10 KA unit 1.00 190,129.50 190,129.50
- RCCB/ELCB, 4P, 25A, Sensitifitas : 30 mA unit 1.00 568,551.50 568,551.50
- MCB 1P/6A 6 KA unit 4.00 40,414.00 161,656.00
- MCB 1P/10A 6 KA unit 1.00 40,414.00 40,414.00
- Box plastic mini pragma pintu transparant, inbow, 12 modul unit 1.00 308,000.00 308,000.00
- MCB 1P/16A 6 KA unit 1.00 200,200.00 200,200.00
- RCCB/ELCB, 2P, 16A, Sensitifitas : 30 mA unit 1.00 1,074,150.00 1,074,150.00
- MCB 1P/4A 6 KA unit 6.00 161,700.00 970,200.00
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 807,660.48 807,660.48
Penerangan Ruang Pos Jaga 0
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 396,000.00 396,000.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 528,000.00 528,000.00
- Single switch 10 A/ 220V plano unit 6.00 18,700.00 112,200.00
- Double Switch 10 A/ 220V plano unit 2.00 23,100.00 46,200.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 4.00 253,605.40 1,014,421.58
- Kabel NYM 3 x 2,5 mm2 m 80.00 14,300.00 1,144,000.00
- uPVC Conduit 20 m m 70.00 8,635.00 604,450.00
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
- Lampu TL 2 X 18W/WP unit 9.00 65,450.00 589,050.00
- Lampu jalan 50 W /SINGEL unit 12.00 513,128.00 6,157,536.00
- Outlet 10 A/2P+E 220V unit 6.00 170,940.00 1,025,640.00
- Single switch 10 A/ 220V plano unit 6.00 18,700.00 112,200.00
- Kabel dari P. Penerangan ke PJU
- - NYFGBY 3 x 2,5 mm2 meter 280.00 43,274.00 12,116,720.00
- Kabel dari P. Penerangan ke Lampu Taman
- - NYFGBY 3 x 2,5 mm2 meter 130.00 43,274.00 5,625,620.00
- Kabel dari P. Penerangan ke lampu stop kontak Penguras
- - NYFGBY 3 x 2,5 mm2 meter 90.00 43,274.00 3,894,660.00
- Junction Box untuk kabel NYFGBY ke NYM unit 1.00 1,099,560.00 1,099,560.00
- Instalasi titik lampu titik 15.00 589,050.00 8,835,750.00
- Instalasi titik lampu jalan titik 12.00 589,050.00 7,068,600.00
- Instalasi stop kontak titik 6.00 392,700.00 2,356,200.00
Jumlah 57,269,749.06
d Pemasangan Elektrikal dan Accesories 0
Panel Penerangan Pos Jaga (PP-PJ) 0
- Perakitan dan Pemasangan lengkap termasuk aksesoris set 1.00 807,660.48 807,660.48
Penerangan Ruang Pos Jaga 0
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 4.00 24,200.00 96,800.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 24,200.00
- Titik Lampu titik 2.00 72,689.44 145,378.88
Penyambungan Listrik PLN 0
- Uang Jaminan Pelanggan VA 4,400.00 272.25 1,197,900.00
- Biaya penyambungan VA 4,400.00 555.50 2,444,200.00
- Biaya installatir termasuk Sertifikasi Laik Operasi VA 4,400.00 145.20 638,880.00
- Biaya konstruksi dan peralatan penunjang LS 1.00 226,671,423.94 226,671,423.94
Jumlah 232,082,983.30
-
e Pengadaan Elektrikal dan Accesories
Panel Penerangan Pos Jaga (PP-PJ)
- Box Plastic mini pragma pintu tranparant, inbow, 12 modul Unit 1.00 186,780.00 186,780.00
- MCB 3P/16A 10 KA unit 1.00 190,129.50 190,129.50
- RCCB/ELCB, 4P, 25A, Sensitifitas : 30 mA unit 1.00 568,551.50 568,551.50
- MCB 1P/6A 6 KA unit 4.00 40,414.00 161,656.00
- MCB 1P/10A 6 KA unit 1.00 40,414.00 40,414.00
Penerangan Toilet
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 396,000.00 396,000.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 528,000.00 528,000.00
- Single switch 10 A/ 220V plano unit 8.00 18,700.00 149,600.00
- Double Switch 10 A/ 220V plano unit 2.00 23,100.00 46,200.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 6.00 253,605.40 1,521,632.38
- Kabel NYM 3 x 2,5 mm2 m 200.00 14,300.00 2,860,000.00
- uPVC Conduit 20 m m 75.00 8,635.00 647,625.00
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
Penerangan Ruang Pos Jaga
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 396,000.00 396,000.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 528,000.00 528,000.00
- Single switch 10 A/ 220V plano unit 6.00 18,700.00 112,200.00
- Double Switch 10 A/ 220V plano unit 2.00 23,100.00 46,200.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 4.00 253,605.40 1,014,421.58
- Kabel NYM 3 x 2,5 mm2 m 80.00 14,300.00 1,144,000.00
- uPVC Conduit 20 m m 70.00 8,635.00 604,450.00
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
- Panel Lokal Valve Sedimentasi 0
- Penangkal Petir type Elctrode dengan Rmin = 60m LS 1.00 10,822,650.43 10,822,650.43
- Grounding Anchor Rot 4 meter (3/4) unit 5.00 770,000.00 3,850,000.00
- - NYA 50 mm2 meter 10.00 150,150.00 1,501,500.00
- Clamp Anchor Rot 50 mm2 unit 2.00 16,940.00 33,880.00
- Air terminal Ø 1, termasuk dudukan, komplit set 1.00 686,511.41 686,511.41
- GIP Ø 3 unit 1.00 1,811,040.00 1,811,040.00
- GIP Ø 2 unit 1.00 123,200.00 123,200.00
- Box control 30x30x70 cm unit 1.00 848,043.50 848,043.50
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 807,660.48 807,660.48
- Pengesahan Depnaker LS 1.00 4,620,000.00 4,620,000.00
Jumlah 36,316,745.78

f Pemasangan Elektrikal dan Accesories


Panel Penerangan Pos Jaga (PP-PJ)
- Perakitan dan Pemasangan lengkap termasuk aksesoris set 1.00 807,660.48 807,660.48
- Penerangan Toilet
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 6.00 24,200.00 145,200.00
- Titik Lampu titik 2.00 72,689.44 145,378.88
Penerangan Ruang Pos Jaga
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 4.00 24,200.00 96,800.00
- Titik Lampu titik 2.00 72,689.44 145,378.88
Jumlah 1,501,898.24
g Pengadaan Lampu penerangan luar
Dari panel PP-LR1
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 2,464,000.00 41,888,000.00
- Tiang lampu hot dip galvanis 6 m set 17.00 2,200,000.00 37,400,000.00
- Kabel NYFGbY 3 x 4 mm2 m 15.00 26,950.00 404,250.00
- Kabel NYFGbY 3 x 2,5 mm2 m 185.00 18,700.00 3,459,500.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Kabel NYFGbY 2 x 2,5 mm2 m 100.00 15,950.00 1,595,000.00
- GIP 2" m 6.00 123,200.00 739,200.00
Dari panel PP-LR2
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 2,464,000.00 41,888,000.00
- Tiang lampu hot dip galvanis 6 m set 17.00 2,200,000.00 37,400,000.00
- Kabel NYFGbY 4 x 4 mm2 m 30.00 31,900.00 957,000.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Kabel NYFGbY 3 x 4 mm2 m 50.00 26,950.00 1,347,500.00
- Kabel NYFGbY 3 x 2,5 mm2 m 50.00 18,700.00 935,000.00
- Kabel NYFGbY 4 x 2,5 mm2 m 60.00 22,000.00 1,320,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 40.00 15,950.00 638,000.00
Dari panel PP-LR3
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 2,464,000.00 41,888,000.00
- Kabel NYFGbY 3 x 2,5 mm2 m 150.00 18,700.00 2,805,000.00
- Kabel NYFGbY 4 x 4 mm2 m 50.00 31,900.00 1,595,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 220.00 15,950.00 3,509,000.00
- 5. GIP 2" m 6.00 123,200.00 739,200.00
- Tiang lampu hot dip galvanis 6 m set 8.00 2,200,000.00 17,600,000.00
Jumlah 238,107,650.00
h Pemasangan Lampu penerangan luar
Dari panel PP-LR1
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 807,660.48 13,730,228.16
- Kabel NYFGbY 3 x 4 mm2 m 15.00 30,800.00 462,000.00
- Kabel NYFGbY 3 x 2,5 mm2 m 185.00 30,800.00 5,698,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 100.00 30,800.00 3,080,000.00
Dari panel PP-LR2
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 807,660.48 13,730,228.16
- Kabel NYFGbY 4 x 4 mm2 m 30.00 30,800.00 924,000.00
- Kabel NYFGbY 3 x 4 mm2 m 50.00 30,800.00 1,540,000.00
- Kabel NYFGbY 3 x 2,5 mm2 m 50.00 30,800.00 1,540,000.00
- Kabel NYFGbY 4 x 2,5 mm2 m 60.00 30,800.00 1,848,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 40.00 30,800.00 1,232,000.00
Dari panel PP-LR3
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 807,660.48 13,730,228.16
- Kabel NYFGbY 3 x 2,5 mm2 m 150.00 30,800.00 4,620,000.00
- Kabel NYFGbY 4 x 4 mm2 m 50.00 30,800.00 1,540,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 220.00 30,800.00 6,776,000.00
Jumlah 70,450,684.48

BANGUNAN RESERVOIR BENGKEL Err:509


Err:509
A BANGUNAN RESERVOIR KAPASITAS 750 M3
1 PEKERJAAN TANAH
1 Pengukuran dan Pasang Bowplank m' 88.10 - -
2 Galian Tanah dengan excavator m3 603.04 - -
3 Urugan Tanah Kembali dengan Pemadatan m3 79.29 - -
4 Urugan Pasir t = 10 cm m3 31.63 - -
Jumlah -
2 PEKERJAAN STRUKTUR ATAU SIPIL DAN ASITEKTUR
a Pekerjaan Beton
2 Lantai Kerja K - 125 (1 PC : 3 PS : 5KR)
- Cor Beton Camp 1:3:5 m3 31.63 - -
4 Pekerjaan Sloof
- Beton Cor K-300 m3 12.34 - -
- Pekerjaan Besi Beton Kg 3,035.25 - -
- Begesting Pasangan Batako m2 106.08 - -
5 Pekerjaan Beton Lantai
- Beton Cor K-300 m3 78.56 - -
- besi Beton Kg 11,603.88 - -
6 Pekerjaan Beton Kolom
- Beton Cor K-300 m3 9.78 - -
- besi Beton Kg 2,501.26 - -
- Begesting 2 X pakai m2 171.38 - -
7 Pekerjaan Beton Dinding
- Beton Cor K-300 m3 59.76 - -
- besi Beton Kg 6,827.74 - -
- Begesting 2 X pakai m2 597.64 - -
- Pekerjaan Tie Rod pada Bekisting Vertikal m1 468.00 - -
9 Pekerjaan Beton Balok
- Beton Cor K-300 m3 10.94 - -
- besi Beton Kg 2,865.43 - -
- Begesting 2 X pakai m2 153.20 - -
###Pekerjaan Beton Plat Atap
- Beton Cor K-300 m3 31.43 - -
- besi Beton Kg 5,803.29 - -
- Begesting m2 314.26 - -
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
Jumlah -
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
b Pekerjaan Pasangan dan Pelapis
###Pekerjaan Pas, Dinding Bata Merah m2 142.80 - -
###Pekerjaan Water Proofing m2 1,212.93 - -
###Pekerjaan Water Stop m 299.20 - -
###Pekerjaan Plesteran 1 PC : 2 Ps m2 1,258.23 - -
###Pekerjaan Acian m2 45.30 - -
Jumlah -

c Pekerjaan Kusen Pintu dan Relling


###Pekerjaan Pipa Ventilasi GIP 4" Unit 4.00 750,000.00 3,000,000.00
###Pekerjaan Penutup Man Hole Plat Besi T= 1.2 mm Unit 5.00 Err:509 Err:509
###Pekerjaan Tangga Inspeksi Pipa GIP Unit 4.00 Err:509 Err:509
Pekerjaan Tangga Besi Kg 172.50 - -
Jumlah Err:509

3 PEKERJAAN PIPA DAN ACCESSORIES


Pengadaan
Pipa In Flow Pipa Baja Three layer Polythylene dia.OD 273,05 mm, tebal di m 53.10 866,399.22 46,005,798.76
Pipa Over Flow dan Penguras Pipa Baja Three layer Polythylene dia.OD 273 m 57.83 866,399.22 50,103,867.09
Pipa Out Flow Pipa Baja Three layer Polythylene dia.OD 273,05 mm, tebal d m 55.02 866,399.22 47,669,285.27
Bend 90° Three Layer Polythelene dia OD 273,05 mm, tebal dinding 4,17 mm bh 7.00 3,604,346.94 25,230,428.55
Tee OD 273,05 X 273,05 bh 1.00 Err:509 Err:509
Strainer Y OD Ø 273,05 bh 1.00 Err:509 Err:509
AF Gate Valve PN 16 dia. 10 3/4 bh 3.00 - -
Dismantling Joint dia. 10 3/4'' bh 3.00 - -
Watermeter dia. 10 3/4'' bh 1.00 Err:509 Err:509
End Cap dia. 10 3/4'' bh 1.00 - -
Saringan dia. 10 3/4'' bh 1.00 2,700,000.00 2,700,000.00
Pemasangan
Pipa In Flow Pipa Baja Three layer Polythylene dia.OD 273,05 mm, tebal di m 53.10 - -
Pipa Over Flow dan Penguras Pipa Baja Three layer Polythylene dia.OD 273 m 57.83 - -
Pipa Out Flow Pipa Baja Three layer Polythylene dia.OD 273,05 mm, tebal d m 55.02 - -
Bend 90° Three Layer Polythelene dia OD 273,05 mm, tebal dinding 4,17 mm bh 7.00 60,000.00 420,000.00
Tee OD 273,05 X 273,05 bh 1.00 60,000.00 60,000.00
Strainer Y OD Ø 273,05 bh 1.00 60,000.00 60,000.00
AF Gate Valve PN 16 dia. 10 3/4 bh 3.00 60,000.00 180,000.00
Dismantling Joint dia. 10 3/4'' bh 3.00 60,000.00 180,000.00
Watermeter dia. 10 3/4'' bh 1.00 60,000.00 60,000.00
End Cap dia. 10 3/4'' bh 1.00 60,000.00 60,000.00
Saringan dia. 10 3/4'' bh 1.00 60,000.00 60,000.00
Jumlah Err:509

72,000.00
B RUMAH POMPA
1 PEKERJAAN TANAH
1 Pengukuran dan Pasang Bowplank m' 40.00 - -
2 Galian Tanah dengan excavator m3 28.06 - -
3 Urugan Tanah Kembali dengan Pemadatan m3 6.34 - -
4 Urugan Pasir t = 10 cm m3 1.74 - -
1 Pek. Urugan Tanah Peninggian Lantai m3 3.75 - -
2 Pek. Urugan Pasir Lantai Kerja m3 1.25 - -
Jumlah -
2 PEKERJAAN STRUKTUR ATAU SIPIL DAN ASITEKTUR
a Pekerjaan Beton
2 Lantai Kerja K - 125 (1 PC : 3 PS : 5KR)
- Cor Beton Camp 1:3:5 m3 1.25 - -
Dudukan Genset
- Cor Beton K 175 m3 2.34 - -
4 Pekerjaan Sloof
- Beton Cor K-300 m3 0.75 - -
- Pekerjaan Besi Beton Kg 101.04 - -
- Begesting Pasangan Batako m2 10.00 - -
6 Pekerjaan Beton Kolom
- Beton Cor K-300 m3 0.34 - -
- besi Beton Kg 101.04 - -
- Begesting 2 X pakai m2 9.18 - -
9 Pekerjaan Beton Balok
- Beton Cor K-300 m3 0.75 - -
- besi Beton Kg 101.04 - -
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Begesting 2 X pakai m2 13.75 - -
Jumlah -
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
b Pekerjaan Pasangan dan Pelapis
Pekerjaan Pasangan Batu Kosong m3 2.13 - -
Pekerjaan Pasangan Batu Kali Camp 1 : 5 m3 8.50 - -
###Pekerjaan Pasangan Batako m2 75.60 - -
###Pekerjaan Plesteran 1 PC : 5 PS m2 151.20 - -
###Pekerjaan Acian m2 151.20 - -
Pekerjaan Cat Dinding m2 151.20 - -
Jumlah -

c Pekerjaan Atap
###Pekerjaan Rangka Kuda-Kuda Atap m3 0.39 - -
###Pekerjaan Usuk dan Reng m2 107.10 - -
###Pekerjaan Pasangan Atap Genteng m2 57.82 - -
Pekerjaan Pas Bubungan m' 32.40 - -
Pekerjaan Pas. Ikut Celedu unit 4.00 - -
Pekerjaan Pas. Murda unit 1.00 - -
Pekerjaan Pas. Listplank m' 27.36 - -
Pekerjaan Pas. Tatab m' 27.36 - -
Pek. Cat Listplank m2 10.94 - -
Jumlah -
d Pekerjaan Langit-Langit
###Pas. Plafond Kasiboard Rangka Hollow m3 25.00 - -
###Pas. List Gypsum m' 50.00 - -
###Pek. Cat Plafond m2 25.00 - -
Jumlah -
e Pekerjaan Penutup Lantai
###Pas. Keramik Uk. 30x30 cm m3 25.00 - -
Jumlah -
8 Pekerjaan Kusen Pintu dan Jendela
###Pas. Kusen Kayu Kamper (R. Jaga Kantor) m3 0.09 - -
###Pas. Daun Pintu Kayu Kamper m2 3.84 - -
###Pas. Jendela Kaca m2 0.88 - -
###Pas. Engsel Pintu set 6.00 - -
###Pas. Handle & Kunci Pintu m' 2.00 - -
Pas. Engsel Jendela unit 2.00 - -
Pas. Grendel Jendela unit 1.00 - -
Pas. Kait Angin unit 2.00 - -
Pas. Kusen Aluminium m' 9.84 - -
Pas. Loster Berlubang m2 0.80 90,000.00 72,000.00
Pek. Polituran m2 6.84 - -
Jumlah 72,000.00

9,394,638.00
C POS JAGA
1 PEKERJAAN TANAH
1 Pengukuran dan Pasang Bowplank m' 32.40 - -
2 Galian Tanah dengan excavator m3 23.35 - -
3 Urugan Tanah Kembali dengan Pemadatan m3 10.48 - -
4 Urugan Pasir t = 10 cm m3 1.13 - -
1 Pek. Urugan Tanah Peninggian Lantai m3 1.50 - -
2 Pek. Urugan Pasir Lantai Kerja m3 1.07 - -
Jumlah -
2 PEKERJAAN STRUKTUR ATAU SIPIL DAN ASITEKTUR
a Pekerjaan Beton
2 Lantai Kerja K - 125 (1 PC : 3 PS : 5KR)
- Cor Beton Camp 1:3:5 m3 1.07 - -
4 Pekerjaan Sloof
- Beton Cor K-300 m3 1.44 - -
- Pekerjaan Besi Beton Kg 163.30 - -
- Begesting Pasangan Batako m2 14.35 - -
6 Pekerjaan Beton Kolom
- Beton Cor K-300 m3 0.96 - -
- besi Beton Kg 193.49 - -
- Begesting 2 X pakai m2 25.51 - -
9 Pekerjaan Beton Balok
- Beton Cor K-300 m3 1.57 - -
- besi Beton Kg 273.81 - -
- Begesting 2 X pakai m2 29.94 - -
9 Pekerjaan Beton Plat Atap
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Beton Cor K-300 m3 1.79 - -
- besi Beton Kg 419.47 - -
- Begesting 1 X pakai m2 14.88 - -
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
9 Pekerjaan Beton Lisplank
- Beton Cor K-300 m3 0.61 - -
- besi Beton Kg 249.26 - -
- Begesting 2 X pakai m2 13.76 - -
9 Pekerjaan Meja Beton
- Beton Cor K-300 m3 0.10 - -
- besi Beton Kg 25.69 - -
- Begesting 2 X pakai m2 1.95 - -
Jumlah -
b Pekerjaan Pasangan dan Pelapis
Pekerjaan Pasangan Batu Kosong m3 3.40 - -
Pekerjaan Pasangan Batu Kali Camp 1 : 5 m3 9.04 - -
###Pekerjaan Pasangan Bata Camp 1:5 m2 99.88 - -
Pekerjaan Trasram m2 13.68 - -
###Pekerjaan Plesteran 1 PC : 5 PS m2 199.76 - -
###Pekerjaan Acian m2 199.76 - -
Pekerjaan Cat Dinding m2 199.76 - -
1 Pek. Pas. Batu Alam Random m2 13.76 - -
2 Pek. Tempelan Batu Candi m2 30.83 - -
Jumlah -
c Pekerjaan Atap
###Pekerjaan Rangka Kuda-Kuda Atap m3 0.46 - -
###Pekerjaan Usuk dan Reng m2 53.04 - -
###Pekerjaan Pasangan Atap Genteng m2 18.71 - -
Pekerjaan Pas Bubungan m' 22.15 - -
Pekerjaan Pas. Ikut Celedu unit 4.00 - -
Pekerjaan Pas. Murda unit 2.00 - -
Pekerjaan Pas. Listplank m' 19.40 - -
Pekerjaan Pas. Tatab m' 19.72 - -
Pek. Cat Listplank m2 9.70 - -
Jumlah -
d Pekerjaan Langit-Langit
###Pas. Plafond Kasiboard Rangka Hollow m3 21.37 - -
###Pas. List Gypsum m' 37.60 - -
###Pek. Cat Plafond m2 21.37 - -
Jumlah -
e Pekerjaan Penutup Lantai
###Pas.Keramik 30 x 30 cm m2 20.68 - -
###Pas. Keramik 20x30 cm m2 2.25 - -
Pas. Keramik Dinding m2 12.60 - -
###Pas. Stepnozing m' 6.00 - -
Jumlah -
f Pekerjaan Kusen Pintu dan Jendela
###Pas. Kusen Kayu Kamper m3 0.23 - -
###Pas. Daun Pintu Kayu Kamper m2 5.19 - -
###Pas. Jendela Kaca m2 1.76 - -
Pas. Kaca Bening t = 5 mm m2 0.78 - -
###Pas. Engsel Pintu set 6.00 - -
Pas. Grendel Pintu unit 2.00 - -
###Pas. Handle & Kunci Pintu m' 2.00 - -
Pas. Engsel Jendela unit 8.00 - -
Pas. Grendel Jendela unit 4.00 - -
Pas. Kait Angin unit 8.00 - -
Pek. Polituran m2 28.50 - -
Jumlah -
g Pekerjaan Toilet
1 Instalasi Plumbing Air Bersih m 25.00 42,900.00 1,072,500.00
2 Instalasi Plumbing Air Kotor m 36.00 231,170.50 8,322,138.00
3 Closet duduk bh 1.00 - -
4 Pasang Washtafel set 1.00 - -
5 Pasang Floor Drain set 1.00 - -
6 Pasang Kran air set 2.00 - -
Pekerjaan Septiktank unit 1.00 - -
Pekerjaan Peresapan unit 1.00 - -
Jumlah 9,394,638.00

-
D PAGAR
Pengukuran dan Pasang Bowplank m' 100.04 - -
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
Galian Tanah dengan excavator m3 25.51 - -
Urugan Tanah Kembali dengan Pemadatan m3 26.41 - -
Urugan Pasir t = 10 cm m3 1.50 - -
Pekerjaan Pasangan Batu Kosong m3 4.50 - -
Pekerjaan Pasangan Batu Kali Camp 1 : 5 m3 16.51 - -
Pekerjaan Sloof
- Beton Cor K-300 m3 5.01 - -
- Pekerjaan Besi Beton Kg 555.32 - -
- Begesting 2 X pakai m2 50.07 - -
Pekerjaan Beton Kolom
- Beton Cor K-300 m3 5.01 - -
- besi Beton Kg 555.32 - -
- Begesting 2 X pakai m2 50.07 - -
Pekerjaan Beton Balok
- Beton Cor K-300 m3 1.45 - -
- besi Beton Kg 255.89 - -
- Begesting 2 X pakai m2 38.76 - -
###Pekerjaan Pasangan Bata Camp 1:5 m2 140.06 - -
###Pekerjaan Plesteran 1 PC : 5 PS m2 465.19 - -
###Pekerjaan Acian m2 465.19 - -
Pekerjaan Paving t=8 mm, K225 m2 607.00 - -
Jumlah -
942,483,600.62
E PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
a Pengadaan mekanikal dan aksesoris
Perpipaan Inlet
- Ø 300 mm Steel pipe SCH.40 m 23.00 2,598,676.66 59,769,563.25
- Ø 300 mm Flange las unit 4.00 3,404,257.12 13,617,028.48
- Ø 300 mm x 90 Steel Bend fl - fl unit 4.00 1,872,200.00 7,488,800.00
- Ø 300 mm x 0,60 m' Double fl - fl ( Wall pipa ) unit 1.00 3,687,800.60 3,687,800.60
- Ø 300 mm Karet Packing unit 7.00 45,320.00 317,240.00
- M24 Baut mur set 64.00 51,036.70 3,266,348.80
Perpipaan Outlet
- Ø 250 mm x 0,60 m' Double fl - fl ( Wall pipa ) unit 2.00 1,842,720.00 3,685,440.00
- Ø 250 mm Steel pipe SCH.40 m' 2.00 1,136,190.00 2,272,380.00
- Ø 250 mm DI Gate Valve metal resilient Seated all flange unit 1.00 17,582,400.00 17,582,400.00
- Ø 250 mm Dismantling Joint/Adaptor unit 1.00 2,557,627.60 2,557,627.60
- Ø 250 mm Water meter unit 1.00 5,457,375.00 5,457,375.00
- Ø 250 mm Strainer unit 1.00 4,220,198.40 4,220,198.40
- Ø 250 mm Saringan unit 1.00 2,779,920.00 2,779,920.00
- Ø 250 mm x 90 Steel Bend fl - fl unit 1.00 1,959,946.56 1,959,946.56
- Ø 250 mm Flange las unit 12.00 903,001.00 10,836,012.00
- Ø 250 mm Karet Packing unit 13.00 34,100.00 443,300.00
- M24 Baut mur set 144.00 51,036.70 7,349,284.80
Perpipaan Drain dan Overflow
- Ø 300 mm x 0,60 m' Double fl - fl ( Wall pipa ) unit 3.00 3,687,800.60 11,063,401.80
- Ø 300 mm Steel pipe SCH.40 m' 7.00 2,598,676.66 18,190,736.64
- Ø 300 mm DI Gate Valve metal resilient Seated all flange unit 1.00 27,806,142.65 27,806,142.65
- Ø 300 mm Dismantling Joint/Adaptor unit 1.00 3,047,616.00 3,047,616.00
- Ø 300 mm x Ø 300 mm Tee steel unit 1.00 3,843,840.00 3,843,840.00
- Ø 300 mm x 90 Steel Bend fl - fl unit 3.00 1,927,124.23 5,781,372.70
- Ø 300 mm Flange las unit 15.00 3,404,257.12 51,063,856.80
- Ø 300 mm Karet Packing unit 15.00 45,320.00 679,800.00
- M24 Baut mur set 240.00 44,187.00 10,604,880.00
- Manhole plat besi T=1.2 MM unit 3.00 1,706,292.50 5,118,877.50
- Pipa Vent unit 3.00 286,000.00 858,000.00
- Ø 50 mm pipa Drainase PVC m 2.00 101,062.50 202,125.00
Jumlah 285,551,314.58

b Pemasangan mekanikal dan aksesoris


Perpipaan Inlet
- Ø 300 mm Steel pipe SCH.40 m 23.00 196,303.35 4,514,977.03
- Ø 300 mm Flange las unit 4.00 521,723.13 2,086,892.50
- Ø 300 mm x 90 Steel Bend fl - fl unit 4.00 136,620.00 546,480.00
- Ø 300 mm x 0,60 m' Double fl - fl ( Wall pipa ) unit 1.00 78,379.81 78,379.81
- Ø 300 mm Karet Packing unit 7.00 1,561.66 10,931.59
- M24 Baut mur set 64.00 892.38 57,112.00
Perpipaan Outlet
- Ø 250 mm x 0,60 m' Double fl - fl ( Wall pipa ) unit 2.00 198,319.00 396,638.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Ø 250 mm Steel pipe SCH.40 m' 2.00 45,708.25 91,416.51
- Ø 250 mm DI Gate Valve metal resilient Seated all flange unit 1.00 214,901.50 214,901.50
- Ø 250 mm Dismantling Joint/Adaptor unit 1.00 214,901.50 214,901.50
- Ø 250 mm Water meter unit 1.00 214,901.50 214,901.50
- Ø 250 mm Strainer unit 1.00 129,827.50 129,827.50
- Ø 250 mm Saringan unit 1.00 86,102.50 86,102.50
- Ø 250 mm x 90 Steel Bend fl - fl unit 1.00 96,932.00 96,932.00
- Ø 250 mm Flange las unit 12.00 45,708.25 548,499.06
- Ø 250 mm Karet Packing unit 13.00 5,685.39 73,910.12
- M24 Baut mur set 144.00 892.38 128,502.00
Perpipaan Drain dan Overflow -
- Ø 300 mm x 0,60 m' Double fl - fl ( Wall pipa ) unit 3.00 136,620.00 409,860.00
- Ø 300 mm Steel pipe SCH.40 m' 7.00 196,303.35 1,374,123.44
- Ø 300 mm DI Gate Valve metal resilient Seated all flange unit 1.00 215,176.50 215,176.50
- Ø 300 mm Dismantling Joint/Adaptor unit 1.00 214,901.50 214,901.50
- Ø 300 mm x Ø 300 mm Tee steel unit 1.00 521,723.13 521,723.13
- Ø 300 mm x 90 Steel Bend fl - fl unit 3.00 136,620.00 409,860.00
- Ø 300 mm Flange las unit 15.00 521,723.13 7,825,846.88
- Ø 300 mm Karet Packing unit 15.00 1,561.66 23,424.84
- M24 Baut mur set 240.00 892.38 214,170.00
- Manhole plat besi T=1.2 MM unit 3.00 93,749.59 281,248.77
- Pipa Vent unit 3.00 44,187.00 132,561.00
- Ø 50 mm pipa Drainase PVC m 2.00 44,187.00 88,374.00
Jumlah 21,202,575.17
c Pengadaan Elektrikal dan Accesories 0
Panel Penerangan Pos Jaga (PP-PJ) 0
- Box Plastic mini pragma pintu tranparant, inbow, 12 modul Unit 1.00 186,780.00 186,780.00
- MCB 3P/16A 10 KA unit 1.00 190,129.50 190,129.50
- RCCB/ELCB, 4P, 25A, Sensitifitas : 30 mA unit 1.00 568,551.50 568,551.50
- MCB 1P/6A 6 KA unit 4.00 40,414.00 161,656.00
- MCB 1P/10A 6 KA unit 1.00 40,414.00 40,414.00
- Box plastic mini pragma pintu transparant, inbow, 12 modul unit 1.00 308,000.00 308,000.00
- MCB 1P/16A 6 KA unit 1.00 200,200.00 200,200.00
- RCCB/ELCB, 2P, 16A, Sensitifitas : 30 mA unit 1.00 1,074,150.00 1,074,150.00
- MCB 1P/4A 6 KA unit 6.00 161,700.00 970,200.00
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 807,660.48 807,660.48
Penerangan Ruang Pos Jaga
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 396,000.00 396,000.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 528,000.00 528,000.00
- Single switch 10 A/ 220V plano unit 6.00 18,700.00 112,200.00
- Double Switch 10 A/ 220V plano unit 2.00 23,100.00 46,200.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 4.00 253,605.40 1,014,421.58
- Kabel NYM 3 x 2,5 mm2 m 80.00 14,300.00 1,144,000.00
- uPVC Conduit 20 m m 70.00 8,635.00 604,450.00
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
- Lampu TL 2 X 18W/WP unit 9.00 65,450.00 589,050.00
- Lampu jalan 50 W /SINGEL unit 12.00 513,128.00 6,157,536.00
- Outlet 10 A/2P+E 220V unit 6.00 170,940.00 1,025,640.00
- Single switch 10 A/ 220V plano unit 6.00 18,700.00 112,200.00
- Kabel dari P. Penerangan ke PJU
- - NYFGBY 3 x 2,5 mm2 meter 280.00 43,274.00 12,116,720.00
- Kabel dari P. Penerangan ke Lampu Taman
- - NYFGBY 3 x 2,5 mm2 meter 130.00 43,274.00 5,625,620.00
- Kabel dari P. Penerangan ke lampu stop kontak Penguras
- - NYFGBY 3 x 2,5 mm2 meter 90.00 43,274.00 3,894,660.00
- Junction Box untuk kabel NYFGBY ke NYM unit 1.00 1,099,560.00 1,099,560.00
- Instalasi titik lampu titik 15.00 589,050.00 8,835,750.00
- Instalasi titik lampu jalan titik 12.00 589,050.00 7,068,600.00
- Instalasi stop kontak titik 6.00 392,700.00 2,356,200.00
Jumlah 57,269,749.06
d Pemasangan Elektrikal dan Accesories
Panel Penerangan Pos Jaga (PP-PJ)
- Perakitan dan Pemasangan lengkap termasuk aksesoris set 1.00 807,660.48 807,660.48
Penerangan Ruang Pos Jaga
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 4.00 24,200.00 96,800.00
- Titik Lampu titik 2.00 72,689.44 145,378.88
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
Penyambungan Listrik PLN
- Uang Jaminan Pelanggan VA 4,400.00 272.25 1,197,900.00
- Biaya penyambungan VA 4,400.00 555.50 2,444,200.00
- Biaya installatir termasuk Sertifikasi Laik Operasi VA 4,400.00 145.20 638,880.00
- Biaya konstruksi dan peralatan penunjang LS 1.00 226,671,423.94 226,671,423.94
Jumlah 232,082,983.30

e Pengadaan Elektrikal dan Accesories


Panel Penerangan Pos Jaga (PP-PJ)
- Box Plastic mini pragma pintu tranparant, inbow, 12 modul Unit 1.00 186,780.00 186,780.00
- MCB 3P/16A 10 KA unit 1.00 190,129.50 190,129.50
- RCCB/ELCB, 4P, 25A, Sensitifitas : 30 mA unit 1.00 568,551.50 568,551.50
- MCB 1P/6A 6 KA unit 4.00 40,414.00 161,656.00
- MCB 1P/10A 6 KA unit 1.00 40,414.00 40,414.00
Penerangan Toilet
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 396,000.00 396,000.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 528,000.00 528,000.00
- Single switch 10 A/ 220V plano unit 8.00 18,700.00 149,600.00
- Double Switch 10 A/ 220V plano unit 2.00 23,100.00 46,200.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 6.00 253,605.40 1,521,632.38
- Kabel NYM 3 x 2,5 mm2 m 200.00 14,300.00 2,860,000.00
- uPVC Conduit 20 m m 75.00 8,635.00 647,625.00
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
Penerangan Ruang Pos Jaga
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 396,000.00 396,000.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 528,000.00 528,000.00
- Single switch 10 A/ 220V plano unit 6.00 18,700.00 112,200.00
- Double Switch 10 A/ 220V plano unit 2.00 23,100.00 46,200.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 4.00 253,605.40 1,014,421.58
- Kabel NYM 3 x 2,5 mm2 m 80.00 14,300.00 1,144,000.00
- uPVC Conduit 20 m m 70.00 8,635.00 604,450.00
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
- Panel Lokal Valve Sedimentasi 0
- Penangkal Petir type Elctrode dengan Rmin = 60m LS 1.00 10,822,650.43 10,822,650.43
- Grounding Anchor Rot 4 meter (3/4) unit 5.00 770,000.00 3,850,000.00
- - NYA 50 mm2 meter 10.00 150,150.00 1,501,500.00
- Clamp Anchor Rot 50 mm2 unit 2.00 16,940.00 33,880.00
- Air terminal Ø 1, termasuk dudukan, komplit set 1.00 686,511.41 686,511.41
- GIP Ø 3 unit 1.00 1,811,040.00 1,811,040.00
- GIP Ø 2 unit 1.00 123,200.00 123,200.00
- Box control 30x30x70 cm unit 1.00 848,043.50 848,043.50
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 807,660.48 807,660.48
- Pengesahan Depnaker LS 1.00 4,620,000.00 4,620,000.00
Jumlah 36,316,745.78

f Pemasangan Elektrikal dan Accesories


Panel Penerangan Pos Jaga (PP-PJ)
- Perakitan dan Pemasangan lengkap termasuk aksesoris set 1.00 807,660.48 807,660.48
- Penerangan Toilet
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 6.00 24,200.00 145,200.00
- Titik Lampu titik 2.00 72,689.44 145,378.88
Penerangan Ruang Pos Jaga
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 4.00 24,200.00 96,800.00
- Titik Lampu titik 2.00 72,689.44 145,378.88
Jumlah 1,501,898.24
g Pengadaan Lampu penerangan luar
Dari panel PP-LR1
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 2,464,000.00 41,888,000.00
- Tiang lampu hot dip galvanis 6 m set 17.00 2,200,000.00 37,400,000.00
- Kabel NYFGbY 3 x 4 mm2 m 15.00 26,950.00 404,250.00
- Kabel NYFGbY 3 x 2,5 mm2 m 185.00 18,700.00 3,459,500.00
- Kabel NYFGbY 2 x 2,5 mm2 m 100.00 15,950.00 1,595,000.00
- GIP 2" m 6.00 123,200.00 739,200.00
Dari panel PP-LR2
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 2,464,000.00 41,888,000.00
- Tiang lampu hot dip galvanis 6 m set 17.00 2,200,000.00 37,400,000.00
- Kabel NYFGbY 4 x 4 mm2 m 30.00 31,900.00 957,000.00
- Kabel NYFGbY 3 x 4 mm2 m 50.00 26,950.00 1,347,500.00
- Kabel NYFGbY 3 x 2,5 mm2 m 50.00 18,700.00 935,000.00
- Kabel NYFGbY 4 x 2,5 mm2 m 60.00 22,000.00 1,320,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 40.00 15,950.00 638,000.00
Dari panel PP-LR3
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 2,464,000.00 41,888,000.00
- Kabel NYFGbY 3 x 2,5 mm2 m 150.00 18,700.00 2,805,000.00
- Kabel NYFGbY 4 x 4 mm2 m 50.00 31,900.00 1,595,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 220.00 15,950.00 3,509,000.00
- 5. GIP 2" m 6.00 123,200.00 739,200.00
- Tiang lampu hot dip galvanis 6 m set 8.00 2,200,000.00 17,600,000.00
Jumlah 238,107,650.00
h Pemasangan Lampu penerangan luar
Dari panel PP-LR1
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 807,660.48 13,730,228.16
- Kabel NYFGbY 3 x 4 mm2 m 15.00 30,800.00 462,000.00
- Kabel NYFGbY 3 x 2,5 mm2 m 185.00 30,800.00 5,698,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 100.00 30,800.00 3,080,000.00
Dari panel PP-LR2
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 807,660.48 13,730,228.16
- Kabel NYFGbY 4 x 4 mm2 m 30.00 30,800.00 924,000.00
- Kabel NYFGbY 3 x 4 mm2 m 50.00 30,800.00 1,540,000.00
- Kabel NYFGbY 3 x 2,5 mm2 m 50.00 30,800.00 1,540,000.00
- Kabel NYFGbY 4 x 2,5 mm2 m 60.00 30,800.00 1,848,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 40.00 30,800.00 1,232,000.00
Dari panel PP-LR3
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 807,660.48 13,730,228.16
- Kabel NYFGbY 3 x 2,5 mm2 m 150.00 30,800.00 4,620,000.00
- Kabel NYFGbY 4 x 4 mm2 m 50.00 30,800.00 1,540,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 220.00 30,800.00 6,776,000.00
Jumlah 70,450,684.48
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6

BANGUNAN RESERVOIR GILIMANUK Err:509


Err:509
IX BANGUNAN RESERVOIR KAPASITAS 500 M3
1 PEKERJAAN TANAH
1 Pengukuran dan Pasang Bowplank m' 73.10 - -
2 Galian Tanah dengan excavator m3 421.35 - -
3 Urugan Tanah Kembali dengan Pemadatan m3 72.92 - -
4 Urugan Pasir t = 10 cm m3 19.48 - -
Jumlah -
2 PEKERJAAN STRUKTUR ATAU SIPIL DAN ASITEKTUR
a Pekerjaan Beton
2 Lantai Kerja K - 125 (1 PC : 3 PS : 5KR)
- Cor Beton Camp 1:3:5 m3 19.48 - -
4 Pekerjaan Sloof
- Beton Cor K-300 m3 7.90 - -
- Pekerjaan Besi Beton Kg 1,999.89 - -
- Begesting Pasangan Batako m2 68.98 - -
5 Pekerjaan Beton Lantai
- Beton Cor K-300 m3 52.31 - -
- besi Beton Kg 7,923.26 - -
6 Pekerjaan Beton Kolom
- Beton Cor K-300 m3 7.39 - -
- besi Beton Kg 1,893.54 - -
- Begesting 2 X pakai m2 129.20 - -
7 Pekerjaan Beton Dinding
- Beton Cor K-300 m3 47.07 - -
- besi Beton Kg 5,328.93 - -
- Begesting 2 X pakai m2 470.68 - -
- Pekerjaan Tie Rod pada Bekisting Vertikal m1 368.00 - -
9 Pekerjaan Beton Balok
- Beton Cor K-300 m3 7.23 - -
- besi Beton Kg 1,929.63 - -
- Begesting 2 X pakai m2 101.26 - -
###Pekerjaan Beton Plat Atap
- Beton Cor K-300 m3 20.92 - -
- besi Beton Kg 3,840.13 - -
- Begesting m2 209.23 - -
Jumlah -

b Pekerjaan Pasangan dan Pelapis


###Pekerjaan Pas, Dinding Bata Merah m2 259.00 - -
###Pekerjaan Water Proofing m2 1,171.80 - -
###Pekerjaan Water Stop m 235.70 - -
###Pekerjaan Plesteran 1 PC : 2 Ps m2 1,207.72 - -
###Pekerjaan Acian m2 35.92 - -
Jumlah -

c Pekerjaan Kusen Pintu dan Relling


###Pekerjaan Pipa Ventilasi GIP 4" Unit 4.00 750,000.00 3,000,000.00
###Pekerjaan Penutup Man Hole Plat Besi T= 1.2 mm Unit 5.00 Err:509 Err:509
###Pekerjaan Tangga Inspeksi Pipa GIP Unit 4.00 Err:509 Err:509
Pekerjaan Tangga Besi Kg 172.50 - -
Jumlah Err:509
3 PEKERJAAN PIPA DAN ACCESSORIES
Pengadaan
Pipa In Flow PVC OD dia 355 mm m 53.10 Err:509 Err:509
Pipa Over Flow dan Penguras Pipa PVC OD dia 355 mm m 57.83 Err:509 Err:509
Pipa Out Flow Pipa PVC OD dia 355 mm m 55.02 Err:509 Err:509
Bend 90° Pipa PVC dia OD 355 mm bh 7.00 Err:509 Err:509
Tee OD 355 x 355 mm bh 1.00 - -
Strainer Y OD Ø 355 mm bh 1.00 - -
AF Gate Valve PN 16 dia. 14'' bh 3.00 - -
Dismantling Joint dia. 14'' bh 3.00 - -
Watermeter dia. 14'' bh 1.00 Err:509 Err:509
Saringan dia. 14'' bh 1.00 3,500,000.00 3,500,000.00
Pemasangan
Pipa In Flow PVC OD dia 355 mm m 53.10 Err:509 Err:509
Pipa Over Flow dan Penguras Pipa PVC OD dia 355 mm m 57.83 Err:509 Err:509
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
Pipa Out Flow Pipa PVC OD dia 355 mm m 55.02 Err:509 Err:509
Bend 90° Pipa PVC dia OD 355 mm bh 7.00 10,500.00 73,500.00
Tee OD 355 x 355 mm bh 1.00 10,500.00 10,500.00
Strainer Y OD Ø 355 mm bh 1.00 10,500.00 10,500.00
AF Gate Valve PN 16 dia. 14'' bh 3.00 10,500.00 31,500.00
Dismantling Joint dia. 14'' bh 3.00 10,500.00 31,500.00
Watermeter dia. 14'' bh 1.00 10,500.00 10,500.00
Saringan dia. 14'' bh 1.00 10,500.00 10,500.00
Jumlah Err:509

9,394,638.00
B POS JAGA
1 PEKERJAAN TANAH
1 Pengukuran dan Pasang Bowplank m' 32.40 - -
2 Galian Tanah dengan excavator m3 23.35 - -
3 Urugan Tanah Kembali dengan Pemadatan m3 10.48 - -
4 Urugan Pasir t = 10 cm m3 1.13 - -
1 Pek. Urugan Tanah Peninggian Lantai m3 1.50 - -
2 Pek. Urugan Pasir Lantai Kerja m3 1.07 - -
Jumlah -
2 PEKERJAAN STRUKTUR ATAU SIPIL DAN ASITEKTUR
a Pekerjaan Beton
2 Lantai Kerja K - 125 (1 PC : 3 PS : 5KR)
- Cor Beton Camp 1:3:5 m3 1.07 - -
4 Pekerjaan Sloof
- Beton Cor K-300 m3 1.44 - -
- Pekerjaan Besi Beton Kg 163.30 - -
- Begesting Pasangan Batako m2 14.35 - -
6 Pekerjaan Beton Kolom
- Beton Cor K-300 m3 0.96 - -
- besi Beton Kg 193.49 - -
- Begesting 2 X pakai m2 25.51 - -
9 Pekerjaan Beton Balok
- Beton Cor K-300 m3 1.57 - -
- besi Beton Kg 273.81 - -
- Begesting 2 X pakai m2 29.94 - -
9 Pekerjaan Beton Plat Atap
- Beton Cor K-300 m3 1.79 - -
- besi Beton Kg 419.47 - -
- Begesting 1 X pakai m2 14.88 - -
9 Pekerjaan Beton Lisplank
- Beton Cor K-300 m3 0.61 - -
- besi Beton Kg 249.26 - -
- Begesting 2 X pakai m2 13.76 - -
9 Pekerjaan Meja Beton
- Beton Cor K-300 m3 0.10 - -
- besi Beton Kg 25.69 - -
- Begesting 2 X pakai m2 1.95 - -
Jumlah -
b Pekerjaan Pasangan dan Pelapis
Pekerjaan Pasangan Batu Kosong m3 3.40 - -
Pekerjaan Pasangan Batu Kali Camp 1 : 5 m3 9.04 - -
###Pekerjaan Pasangan Bata Camp 1:5 m2 99.88 - -
Pekerjaan Trasram m2 13.68 - -
###Pekerjaan Plesteran 1 PC : 5 PS m2 199.76 - -
###Pekerjaan Acian m2 199.76 - -
Pekerjaan Cat Dinding m2 199.76 - -
1 Pek. Pas. Batu Alam Random m2 13.76 - -
2 Pek. Tempelan Batu Candi m2 30.83 - -
Jumlah -
c Pekerjaan Atap
###Pekerjaan Rangka Kuda-Kuda Atap m3 0.46 - -
###Pekerjaan Usuk dan Reng m2 53.04 - -
###Pekerjaan Pasangan Atap Genteng m2 18.71 - -
Pekerjaan Pas Bubungan m' 22.15 - -
Pekerjaan Pas. Ikut Celedu unit 4.00 - -
Pekerjaan Pas. Murda unit 2.00 - -
Pekerjaan Pas. Listplank m' 19.40 - -
Pekerjaan Pas. Tatab m' 19.72 - -
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
Pek. Cat Listplank m2 9.70 - -
Jumlah -
d Pekerjaan Langit-Langit
###Pas. Plafond Kasiboard Rangka Hollow m3 21.37 - -
###Pas. List Gypsum m' 37.60 - -
###Pek. Cat Plafond m2 21.37 - -
Jumlah -
e Pekerjaan Penutup Lantai
###Pas.Keramik 30 x 30 cm m2 20.68 - -
###Pas. Keramik 20x30 cm m2 2.25 - -
Pas. Keramik Dinding m2 12.60 - -
###Pas. Stepnozing m' 6.00 - -
Jumlah -
f Pekerjaan Kusen Pintu dan Jendela
###Pas. Kusen Kayu Kamper m3 0.23 - -
###Pas. Daun Pintu Kayu Kamper m2 5.19 - -
###Pas. Jendela Kaca m2 1.76 - -
Pas. Kaca Bening t = 5 mm m2 0.78 - -
###Pas. Engsel Pintu set 6.00 - -
Pas. Grendel Pintu unit 2.00 - -
###Pas. Handle & Kunci Pintu m' 2.00 - -
Pas. Engsel Jendela unit 8.00 - -
Pas. Grendel Jendela unit 4.00 - -
Pas. Kait Angin unit 8.00 - -
Pek. Polituran m2 28.50 - -
Jumlah -
g Pekerjaan Toilet
1 Instalasi Plumbing Air Bersih m 25.00 42,900.00 1,072,500.00
2 Instalasi Plumbing Air Kotor m 36.00 231,170.50 8,322,138.00
3 Closet duduk bh 1.00 - -
4 Pasang Washtafel set 1.00 - -
5 Pasang Floor Drain set 1.00 - -
6 Pasang Kran air set 2.00 - -
Pekerjaan Septiktank unit 1.00 - -
Pekerjaan Peresapan unit 1.00 - -
Jumlah 9,394,638.00

-
C PAGAR
Pengukuran dan Pasang Bowplank m' 100.04 - -
Galian Tanah dengan excavator m3 21.06 - -
Urugan Tanah Kembali dengan Pemadatan m3 21.81 - -
Urugan Pasir t = 10 cm m3 1.24 - -
Pekerjaan Pasangan Batu Kosong m3 3.72 - -
Pekerjaan Pasangan Batu Kali Camp 1 : 5 m3 13.63 - -
Pekerjaan Sloof
- Beton Cor K-300 m3 4.14 - -
- Pekerjaan Besi Beton Kg 458.76 - -
- Begesting 2 X pakai m2 41.35 - -
Pekerjaan Beton Kolom
- Beton Cor K-300 m3 4.14 - -
- besi Beton Kg 458.76 - -
- Begesting 2 X pakai m2 41.35 - -
Pekerjaan Beton Balok
- Beton Cor K-300 m3 1.50 - -
- besi Beton Kg 263.42 - -
- Begesting 2 X pakai m2 39.90 - -
###Pekerjaan Pasangan Bata Camp 1:5 m2 115.64 - -
###Pekerjaan Plesteran 1 PC : 5 PS m2 384.09 - -
###Pekerjaan Acian m2 384.09 - -
Pekerjaan Paving t=8 mm, K225 m2 385.63 - -
Jumlah -
868,787,951.78
D PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
a Pengadaan mekanikal dan aksesoris
Perpipaan Inlet
- Ø 300 mm PVC pipe unit 24.00 810,306.20 19,447,348.80
- Ø 300 mm x 90 PVC Bend unit 4.00 488,620.00 1,954,480.00
- Ø 300 mm x 0,60 m' Double ( Wall pipa ) unit 1.00 339,790.00 339,790.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
Perpipaan Outlet
- Ø 300 mm x 0,60 m' Double fl-fl ( Wall pipa ) unit 2.00 3,687,800.60 7,375,601.20
- Ø 300 mm Steel pipe Sch.40 m' 3.00 2,598,676.66 7,796,029.99
- Ø 300 mm DI Gate Valve metal resilient Seated all flange unit 1.00 27,806,142.65 27,806,142.65
- Ø 300 mm Dismantling Joint/Adaptor unit 1.00 3,047,616.00 3,047,616.00
- Ø 300 mm Water meter unit 1.00 6,548,850.00 6,548,850.00
- Ø 300 mm Strainer unit 1.00 4,621,848.00 4,621,848.00
- Ø 300 mm Saringan unit 1.00 4,086,720.00 4,086,720.00
- Ø 300 mm x 90 PVC Bend unit 1.00 488,620.00 488,620.00
- Ø 300 mm Flange las unit 10.00 3,404,257.12 34,042,571.20
- Ø 300 mm Karet Packing unit 10.00 45,320.00 453,200.00
- M24 Baut mur set 160.00 40,170.00 6,427,200.00
Perpipaan Drain dan Overflow
- Ø 300 mm x 0,60 m' Double fl - fl ( Wall pipa ) unit 3.00 3,687,800.60 11,063,401.80
- Ø 300 mm PVC pipe unit 5.00 2,598,676.66 12,993,383.32
- Ø 300 mm DI Gate Valve metal resilient Seated all flange m' 1.00 27,806,142.65 27,806,142.65
- Ø 300 mm Dismantling Joint/Adaptor m' 1.00 3,047,616.00 3,047,616.00
- Ø 300 mm x Ø 300 mm Tee steel unit 1.00 3,843,840.00 3,843,840.00
- Ø 300 mm x 90 PVC Bend unit 3.00 488,620.00 1,465,860.00
- Ø 300 mm Flange las unit 6.00 3,404,257.12 20,425,542.72
- Ø 300 mm Karet Packing unit 6.00 45,320.00 271,920.00
- M24 Baut mur set 96.00 44,187.00 4,241,952.00
- Manhole plat besi T=1.2 MM set 3.00 1,706,292.50 5,118,877.50
- Pipa Vent set 3.00 286,000.00 858,000.00
- Ø 50 mm pipa Drainase PVC unit 2.00 101,062.50 202,125.00
Jumlah 215,774,678.82

b Pemasangan mekanikal dan aksesoris


Perpipaan Inlet
- Ø 300 mm PVC pipe unit 24.00 121,749.10 2,921,978.40
- Ø 300 mm x 90 PVC Bend unit 4.00 121,749.10 486,996.40
- Ø 300 mm x 0,60 m' Double ( Wall pipa ) unit 1.00 121,749.10 121,749.10
Perpipaan Outlet
- Ø 300 mm x 0,60 m' Double fl-fl ( Wall pipa ) unit 2.00 136,620.00 273,240.00
- Ø 300 mm Steel pipe Sch.40 m' 3.00 196,303.35 588,910.05
- Ø 300 mm DI Gate Valve metal resilient Seated all flange unit 1.00 215,176.50 215,176.50
- Ø 300 mm Dismantling Joint/Adaptor unit 1.00 214,901.50 214,901.50
- Ø 300 mm Water meter unit 1.00 214,901.50 214,901.50
- Ø 300 mm Strainer unit 1.00 129,827.50 129,827.50
- Ø 300 mm Saringan unit 1.00 129,827.50 129,827.50
- Ø 300 mm x 90 PVC Bend unit 1.00 129,827.50 129,827.50
- Ø 300 mm Flange las unit 10.00 521,723.13 5,217,231.25
- Ø 300 mm Karet Packing unit 10.00 1,561.66 15,616.56
- M24 Baut mur set 160.00 892.38 142,780.00
Perpipaan Drain dan Overflow
- Ø 300 mm x 0,60 m' Double fl - fl ( Wall pipa ) unit 3.00 136,620.00 409,860.00
- Ø 300 mm PVC pipe unit 5.00 196,303.35 981,516.75
- Ø 300 mm DI Gate Valve metal resilient Seated all flange m' 1.00 215,176.50 215,176.50
- Ø 300 mm Dismantling Joint/Adaptor m' 1.00 214,901.50 214,901.50
- Ø 300 mm x Ø 300 mm Tee steel unit 1.00 521,723.13 521,723.13
- Ø 300 mm x 90 PVC Bend unit 3.00 136,620.00 409,860.00
- Ø 300 mm Flange las unit 6.00 521,723.13 3,130,338.75
- Ø 300 mm Karet Packing unit 6.00 1,561.66 9,369.94
- M24 Baut mur set 96.00 892.38 85,668.00
- Manhole plat besi T=1.2 MM set 3.00 93,749.59 281,248.77
- Pipa Vent set 3.00 44,187.00 132,561.00
- Ø 50 mm pipa Drainase PVC unit 2.00 44,187.00 88,374.00
Jumlah 17,283,562.09
c Pengadaan Elektrikal dan Accesories
Panel Penerangan Pos Jaga (PP-PJ)
- Box Plastic mini pragma pintu tranparant, inbow, 12 modul Unit 1.00 186,780.00 186,780.00
- MCB 3P/16A 10 KA unit 1.00 190,129.50 190,129.50
- RCCB/ELCB, 4P, 25A, Sensitifitas : 30 mA unit 1.00 568,551.50 568,551.50
- MCB 1P/6A 6 KA unit 4.00 40,414.00 161,656.00
- MCB 1P/10A 6 KA unit 1.00 40,414.00 40,414.00
- Box plastic mini pragma pintu transparant, inbow, 12 modul unit 1.00 308,000.00 308,000.00
- MCB 1P/16A 6 KA unit 1.00 200,200.00 200,200.00
- RCCB/ELCB, 2P, 16A, Sensitifitas : 30 mA unit 1.00 1,074,150.00 1,074,150.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- MCB 1P/4A 6 KA unit 6.00 161,700.00 970,200.00
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 807,660.48 807,660.48
Penerangan Ruang Pos Jaga
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 396,000.00 396,000.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 528,000.00 528,000.00
- Single switch 10 A/ 220V plano unit 6.00 18,700.00 112,200.00
- Double Switch 10 A/ 220V plano unit 2.00 23,100.00 46,200.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 4.00 253,605.40 1,014,421.58
- Kabel NYM 3 x 2,5 mm2 m 80.00 14,300.00 1,144,000.00
- uPVC Conduit 20 m m 70.00 8,635.00 604,450.00
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
- Lampu TL 2 X 18W/WP unit 9.00 65,450.00 589,050.00
- Lampu jalan 50 W /SINGEL unit 12.00 513,128.00 6,157,536.00
- Outlet 10 A/2P+E 220V unit 6.00 170,940.00 1,025,640.00
- Single switch 10 A/ 220V plano unit 6.00 18,700.00 112,200.00
- Kabel dari P. Penerangan ke PJU
- - NYFGBY 3 x 2,5 mm2 meter 280.00 43,274.00 12,116,720.00
- Kabel dari P. Penerangan ke Lampu Taman
- - NYFGBY 3 x 2,5 mm2 meter 130.00 43,274.00 5,625,620.00
- Kabel dari P. Penerangan ke lampu stop kontak Penguras
- - NYFGBY 3 x 2,5 mm2 meter 90.00 43,274.00 3,894,660.00
- Junction Box untuk kabel NYFGBY ke NYM unit 1.00 1,099,560.00 1,099,560.00
- Instalasi titik lampu titik 15.00 589,050.00 8,835,750.00
- Instalasi titik lampu jalan titik 12.00 589,050.00 7,068,600.00
- Instalasi stop kontak titik 6.00 392,700.00 2,356,200.00
Jumlah 57,269,749.06
d Pemasangan Elektrikal dan Accesories 0
Panel Penerangan Pos Jaga (PP-PJ) 0
- Perakitan dan Pemasangan lengkap termasuk aksesoris set 1.00 807,660.48 807,660.48
Penerangan Ruang Pos Jaga 0
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 4.00 24,200.00 96,800.00
- Titik Lampu titik 2.00 72,689.44 145,378.88
Penyambungan Listrik PLN 0 -
- Uang Jaminan Pelanggan VA 4,400.00 272.25 1,197,900.00
- Biaya penyambungan VA 4,400.00 555.50 2,444,200.00
- Biaya installatir termasuk Sertifikasi Laik Operasi VA 4,400.00 145.20 638,880.00
- Biaya konstruksi dan peralatan penunjang LS 1.00 226,671,423.94 226,671,423.94
Jumlah 232,082,983.30

e Pengadaan Elektrikal dan Accesories


Panel Penerangan Pos Jaga (PP-PJ)
- Box Plastic mini pragma pintu tranparant, inbow, 12 modul Unit 1.00 186,780.00 186,780.00
- MCB 3P/16A 10 KA unit 1.00 190,129.50 190,129.50
- RCCB/ELCB, 4P, 25A, Sensitifitas : 30 mA unit 1.00 568,551.50 568,551.50
- MCB 1P/6A 6 KA unit 4.00 40,414.00 161,656.00
- MCB 1P/10A 6 KA unit 1.00 40,414.00 40,414.00
Penerangan Toilet
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 396,000.00 396,000.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 528,000.00 528,000.00
- Single switch 10 A/ 220V plano unit 8.00 18,700.00 149,600.00
- Double Switch 10 A/ 220V plano unit 2.00 23,100.00 46,200.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 6.00 253,605.40 1,521,632.38
- Kabel NYM 3 x 2,5 mm2 m 200.00 14,300.00 2,860,000.00
- uPVC Conduit 20 m m 75.00 8,635.00 647,625.00
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
Penerangan Ruang Pos Jaga
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 396,000.00 396,000.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 528,000.00 528,000.00
- Single switch 10 A/ 220V plano unit 6.00 18,700.00 112,200.00
- Double Switch 10 A/ 220V plano unit 2.00 23,100.00 46,200.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 4.00 253,605.40 1,014,421.58
- Kabel NYM 3 x 2,5 mm2 m 80.00 14,300.00 1,144,000.00
- uPVC Conduit 20 m m 70.00 8,635.00 604,450.00
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
- Panel Lokal Valve Sedimentasi
- Penangkal Petir type Elctrode dengan Rmin = 60m LS 1.00 10,822,650.43 10,822,650.43
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Grounding Anchor Rot 4 meter (3/4) unit 5.00 770,000.00 3,850,000.00
- - NYA 50 mm2 meter 10.00 150,150.00 1,501,500.00
- Clamp Anchor Rot 50 mm2 unit 2.00 16,940.00 33,880.00
- Air terminal Ø 1, termasuk dudukan, komplit set 1.00 686,511.41 686,511.41
- GIP Ø 3 unit 1.00 1,811,040.00 1,811,040.00
- GIP Ø 2 unit 1.00 123,200.00 123,200.00
- Box control 30x30x70 cm unit 1.00 848,043.50 848,043.50
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 807,660.48 807,660.48
- Pengesahan Depnaker LS 1.00 4,620,000.00 4,620,000.00
Jumlah 36,316,745.78
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
f Pemasangan Elektrikal dan Accesories
Panel Penerangan Pos Jaga (PP-PJ)
- Perakitan dan Pemasangan lengkap termasuk aksesoris set 1.00 807,660.48 807,660.48
- Penerangan Toilet
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 6.00 24,200.00 145,200.00
- Titik Lampu titik 2.00 72,689.44 145,378.88
Penerangan Ruang Pos Jaga
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 4.00 24,200.00 96,800.00
- Titik Lampu titik 2.00 72,689.44 145,378.88
Jumlah 1,501,898.24
g Pengadaan Lampu penerangan luar
Dari panel PP-LR1
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 2,464,000.00 41,888,000.00
- Tiang lampu hot dip galvanis 6 m set 17.00 2,200,000.00 37,400,000.00
- Kabel NYFGbY 3 x 4 mm2 m 15.00 26,950.00 404,250.00
- Kabel NYFGbY 3 x 2,5 mm2 m 185.00 18,700.00 3,459,500.00
- Kabel NYFGbY 2 x 2,5 mm2 m 100.00 15,950.00 1,595,000.00
- GIP 2" m 6.00 123,200.00 739,200.00
Dari panel PP-LR2
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 2,464,000.00 41,888,000.00
- Tiang lampu hot dip galvanis 6 m set 17.00 2,200,000.00 37,400,000.00
- Kabel NYFGbY 4 x 4 mm2 m 30.00 31,900.00 957,000.00
- Kabel NYFGbY 3 x 4 mm2 m 50.00 26,950.00 1,347,500.00
- Kabel NYFGbY 3 x 2,5 mm2 m 50.00 18,700.00 935,000.00
- Kabel NYFGbY 4 x 2,5 mm2 m 60.00 22,000.00 1,320,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 40.00 15,950.00 638,000.00
Dari panel PP-LR3
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 2,464,000.00 41,888,000.00
- Kabel NYFGbY 3 x 2,5 mm2 m 150.00 18,700.00 2,805,000.00
- Kabel NYFGbY 4 x 4 mm2 m 50.00 31,900.00 1,595,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 220.00 15,950.00 3,509,000.00
- 5. GIP 2" m 6.00 123,200.00 739,200.00
- Tiang lampu hot dip galvanis 6 m set 8.00 2,200,000.00 17,600,000.00
Jumlah 238,107,650.00
h Pemasangan Lampu penerangan luar
Dari panel PP-LR1
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 807,660.48 13,730,228.16
- Kabel NYFGbY 3 x 4 mm2 m 15.00 30,800.00 462,000.00
- Kabel NYFGbY 3 x 2,5 mm2 m 185.00 30,800.00 5,698,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 100.00 30,800.00 3,080,000.00
Dari panel PP-LR2
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 807,660.48 13,730,228.16
- Kabel NYFGbY 4 x 4 mm2 m 30.00 30,800.00 924,000.00
- Kabel NYFGbY 3 x 4 mm2 m 50.00 30,800.00 1,540,000.00
- Kabel NYFGbY 3 x 2,5 mm2 m 50.00 30,800.00 1,540,000.00
- Kabel NYFGbY 4 x 2,5 mm2 m 60.00 30,800.00 1,848,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 40.00 30,800.00 1,232,000.00
Dari panel PP-LR3
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 807,660.48 13,730,228.16
- Kabel NYFGbY 3 x 2,5 mm2 m 150.00 30,800.00 4,620,000.00
- Kabel NYFGbY 4 x 4 mm2 m 50.00 30,800.00 1,540,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 220.00 30,800.00 6,776,000.00
Jumlah 70,450,684.48

BANGUNAN RESERVOIR TEGAL Err:509


Err:509
A BANGUNAN RESERVOIR KAPASITAS 800 M3
1 PEKERJAAN TANAH
1 Pengukuran dan Pasang Bowplank m' 88.10 - -
2 Galian Tanah dengan excavator m3 603.04 - -
3 Urugan Tanah Kembali dengan Pemadatan m3 79.29 - -
4 Urugan Pasir t = 10 cm m3 31.63 - -
Jumlah -
2 PEKERJAAN STRUKTUR ATAU SIPIL DAN ASITEKTUR
a Pekerjaan Beton
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
2 Lantai Kerja K - 125 (1 PC : 3 PS : 5KR)
- Cor Beton Camp 1:3:5 m3 31.63 - -
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
4 Pekerjaan Sloof
- Beton Cor K-300 m3 12.34 - -
- Pekerjaan Besi Beton Kg 3,035.25 - -
- Begesting Pasangan Batako m2 106.08 - -
5 Pekerjaan Beton Lantai
- Beton Cor K-300 m3 78.56 - -
- besi Beton Kg 11,603.88 - -
6 Pekerjaan Beton Kolom
- Beton Cor K-300 m3 10.26 - -
- besi Beton Kg 2,619.09 - -
- Begesting 2 X pakai m2 179.74 - -
7 Pekerjaan Beton Dinding
- Beton Cor K-300 m3 62.44 - -
- besi Beton Kg 7,116.81 - -
- Begesting 2 X pakai m2 624.44 - -
- Pekerjaan Tie Rod pada Bekisting Vertikal m1 489.00 - -
9 Pekerjaan Beton Balok
- Beton Cor K-300 m3 10.94 - -
- besi Beton Kg 2,865.43 - -
- Begesting 2 X pakai m2 153.20 - -
###Pekerjaan Beton Plat Atap
- Beton Cor K-300 m3 31.43 - -
- besi Beton Kg 5,803.29 - -
- Begesting m2 314.26 - -
Jumlah -

b Pekerjaan Pasangan dan Pelapis


###Pekerjaan Pas, Dinding Bata Merah m2 149.10 - -
###Pekerjaan Water Proofing m2 1,238.93 - -
###Pekerjaan Water Stop m 300.40 - -
###Pekerjaan Plesteran 1 PC : 2 Ps m2 1,284.23 - -
###Pekerjaan Acian m2 45.30 - -
Jumlah -

c Pekerjaan Kusen Pintu dan Relling


###Pekerjaan Pipa Ventilasi GIP 4" Unit 4.00 750,000.00 3,000,000.00
###Pekerjaan Penutup Man Hole Plat Besi T= 1.2 mm Unit 5.00 Err:509 Err:509
###Pekerjaan Tangga Inspeksi Pipa GIP Unit 4.00 Err:509 Err:509
Pekerjaan Tangga Besi Kg 183.55 - -
Jumlah Err:509

3 PEKERJAAN PIPA DAN ACCESSORIES


Pengadaan
Pipa In Flow Pipa Baja Three layer Polythylene dia.OD 355,6 mm, tebal dind m 53.10 - -
Pipa Over Flow dan Penguras Pipa Baja Three layer Polythylene dia.OD 355 m 57.83 - -
Pipa Out Flow Pipa Baja Three layer Polythylene dia.OD 355,6 mm, tebal di m 55.02 - -
Bend 90° Three Layer Polythelene dia OD 355,6 mm, tebal dinding 5,16 mm bh 7.00 - -
Tee OD 355,6 X 355,6 bh 1.00 - -
Strainer Y OD Ø 355,6 bh 1.00 - -
AF Gate Valve PN 16 dia. 14'' bh 3.00 - -
Dismantling Joint dia. 14'' bh 3.00 - -
Watermeter dia. 14'' bh 1.00 Err:509 Err:509
Saringan dia. 14'' bh 1.00 3,500,000.00 3,500,000.00
Pemasangan
Pipa In Flow Pipa Baja Three layer Polythylene dia.OD 355,6 mm, tebal dind m 53.10 - -
Pipa Over Flow dan Penguras Pipa Baja Three layer Polythylene dia.OD 355 m 57.83 - -
Pipa Out Flow Pipa Baja Three layer Polythylene dia.OD 355,6 mm, tebal di m 55.02 - -
Bend 90° Three Layer Polythelene dia OD 355,6 mm, tebal dinding 5,16 mm bh 7.00 60,000.00 420,000.00
Tee OD 355,6 X 355,6 bh 1.00 60,000.00 60,000.00
Strainer Y OD Ø 355,6 bh 1.00 60,000.00 60,000.00
AF Gate Valve PN 16 dia. 14'' bh 3.00 60,000.00 180,000.00
Dismantling Joint dia. 14'' bh 3.00 60,000.00 180,000.00
Watermeter dia. 14'' bh 1.00 60,000.00 60,000.00
Saringan dia. 14'' bh 1.00 60,000.00 60,000.00
Jumlah Err:509

9,394,638.00
B POS JAGA
1 PEKERJAAN TANAH
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
1 Pengukuran dan Pasang Bowplank m' 32.40 - -
2 Galian Tanah dengan excavator m3 23.35 - -
3 Urugan Tanah Kembali dengan Pemadatan m3 10.48 - -
4 Urugan Pasir t = 10 cm m3 1.13 - -
1 Pek. Urugan Tanah Peninggian Lantai m3 1.50 - -
2 Pek. Urugan Pasir Lantai Kerja m3 1.07 - -
Jumlah -
2 PEKERJAAN STRUKTUR ATAU SIPIL DAN ASITEKTUR
a Pekerjaan Beton
2 Lantai Kerja K - 125 (1 PC : 3 PS : 5KR)
- Cor Beton Camp 1:3:5 m3 1.07 - -
4 Pekerjaan Sloof
- Beton Cor K-300 m3 1.44 - -
- Pekerjaan Besi Beton Kg 163.30 - -
- Begesting Pasangan Batako m2 14.35 - -
6 Pekerjaan Beton Kolom
- Beton Cor K-300 m3 0.96 - -
- besi Beton Kg 193.49 - -
- Begesting 2 X pakai m2 25.51 - -
9 Pekerjaan Beton Balok
- Beton Cor K-300 m3 1.57 - -
- besi Beton Kg 273.81 - -
- Begesting 2 X pakai m2 29.94 - -
9 Pekerjaan Beton Plat Atap
- Beton Cor K-300 m3 1.79 - -
- besi Beton Kg 419.47 - -
- Begesting 1 X pakai m2 14.88 - -
9 Pekerjaan Beton Lisplank
- Beton Cor K-300 m3 0.61 - -
- besi Beton Kg 249.26 - -
- Begesting 2 X pakai m2 13.76 - -
9 Pekerjaan Meja Beton
- Beton Cor K-300 m3 0.10 - -
- besi Beton Kg 25.69 - -
- Begesting 2 X pakai m2 1.95 - -
Jumlah -
b Pekerjaan Pasangan dan Pelapis
Pekerjaan Pasangan Batu Kosong m3 3.40 - -
Pekerjaan Pasangan Batu Kali Camp 1 : 5 m3 9.04 - -
###Pekerjaan Pasangan Bata Camp 1:5 m2 99.88 - -
Pekerjaan Trasram m2 13.68 - -
###Pekerjaan Plesteran 1 PC : 5 PS m2 199.76 - -
###Pekerjaan Acian m2 199.76 - -
Pekerjaan Cat Dinding m2 199.76 - -
1 Pek. Pas. Batu Alam Random m2 13.76 - -
2 Pek. Tempelan Batu Candi m2 30.83 - -
Jumlah -
c Pekerjaan Atap
###Pekerjaan Rangka Kuda-Kuda Atap m3 0.46 - -
###Pekerjaan Usuk dan Reng m2 53.04 - -
###Pekerjaan Pasangan Atap Genteng m2 18.71 - -
Pekerjaan Pas Bubungan m' 22.15 - -
Pekerjaan Pas. Ikut Celedu unit 4.00 - -
Pekerjaan Pas. Murda unit 2.00 - -
Pekerjaan Pas. Listplank m' 19.40 - -
Pekerjaan Pas. Tatab m' 19.72 - -
Pek. Cat Listplank m2 9.70 - -
Jumlah -
d Pekerjaan Langit-Langit
###Pas. Plafond Kasiboard Rangka Hollow m3 21.37 - -
###Pas. List Gypsum m' 37.60 - -
###Pek. Cat Plafond m2 21.37 - -
Jumlah -
e Pekerjaan Penutup Lantai
###Pas.Keramik 30 x 30 cm m2 20.68 - -
###Pas. Keramik 20x30 cm m2 2.25 - -
Pas. Keramik Dinding m2 12.60 - -
###Pas. Stepnozing m' 6.00 - -
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
Jumlah -
f Pekerjaan Kusen Pintu dan Jendela
###Pas. Kusen Kayu Kamper m3 0.23 - -
###Pas. Daun Pintu Kayu Kamper m2 5.19 - -
###Pas. Jendela Kaca m2 1.76 - -
Pas. Kaca Bening t = 5 mm m2 0.78 - -
###Pas. Engsel Pintu set 6.00 - -
Pas. Grendel Pintu unit 2.00 - -
###Pas. Handle & Kunci Pintu m' 2.00 - -
Pas. Engsel Jendela unit 8.00 - -
Pas. Grendel Jendela unit 4.00 - -
Pas. Kait Angin unit 8.00 - -
Pek. Polituran m2 28.50 - -
Jumlah -
g Pekerjaan Toilet
1 Instalasi Plumbing Air Bersih m 25.00 42,900.00 1,072,500.00
2 Instalasi Plumbing Air Kotor m 36.00 231,170.50 8,322,138.00
3 Closet duduk bh 1.00 - -
4 Pasang Washtafel set 1.00 - -
5 Pasang Floor Drain set 1.00 - -
6 Pasang Kran air set 2.00 - -
Pekerjaan Septiktank unit 1.00 - -
Pekerjaan Peresapan unit 1.00 - -
Jumlah 9,394,638.00

-
C PAGAR
Pengukuran dan Pasang Bowplank m' 94.70 - -
Galian Tanah dengan excavator m3 24.15 - -
Urugan Tanah Kembali dengan Pemadatan m3 25.00 - -
Urugan Pasir t = 10 cm m3 1.42 - -
Pekerjaan Pasangan Batu Kosong m3 4.26 - -
Pekerjaan Pasangan Batu Kali Camp 1 : 5 m3 15.63 - -
Pekerjaan Sloof
- Beton Cor K-300 m3 4.74 - -
- Pekerjaan Besi Beton Kg 525.84 - -
- Begesting 2 X pakai m2 47.40 - -
Pekerjaan Beton Kolom
- Beton Cor K-300 m3 4.74 - -
- besi Beton Kg 525.84 - -
- Begesting 2 X pakai m2 47.40 - -
Pekerjaan Beton Balok
- Beton Cor K-300 m3 1.41 - -
- besi Beton Kg 248.37 - -
- Begesting 2 X pakai m2 37.62 - -
###Pekerjaan Pasangan Bata Camp 1:5 m2 132.58 - -
###Pekerjaan Plesteran 1 PC : 5 PS m2 440.36 - -
###Pekerjaan Acian m2 440.36 - -
Pekerjaan Paving t=8 mm, K225 m2 223.17 - -
Jumlah -
1,052,539,722.87
D PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
a Pengadaan mekanikal dan aksesoris
Perpipaan Inlet
- Ø 350 mm Steel pipe SCH.40 m 24.00 3,363,656.73 80,727,761.40
- Ø 350 mm Flange las unit 4.00 4,040,278.00 16,161,112.00
- Ø 350 mm x 90 Steel Bend fl - fl unit 4.00 2,956,800.00 11,827,200.00
- Ø 350 mm x 0,60 m' Double fl - fl ( Wall pipa ) unit 1.00 6,215,638.00 6,215,638.00
- Ø 350 mm Karet Packing unit 7.00 62,315.00 436,205.00
- M24 Baut mur set 64.00 44,187.00 2,827,968.00
Perpipaan Outlet
- Ø 300 mm x 0,60 m' Double fl - fl ( Wall pipa ) unit 2.00 3,687,800.60 7,375,601.20
- Ø 300 mm Steel pipe SCH.40 m' 3.00 2,598,676.66 7,796,029.99
- Ø 300 mm DI Gate Valve metal resilient Seated all flange unit 1.00 27,806,142.65 27,806,142.65
- Ø 300 mm Dismantling Joint/Adaptor unit 1.00 3,047,616.00 3,047,616.00
- Ø 300 mm Water meter unit 1.00 6,548,850.00 6,548,850.00
- Ø 300 mm Strainer unit 1.00 4,621,848.00 4,621,848.00
- Ø 300 mm Saringan unit 1.00 4,086,720.00 4,086,720.00
- Ø 300 mm x 90 Steel Bend fl - fl unit 1.00 1,927,124.23 1,927,124.23
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Ø 300 mm Flange las unit 12.00 3,404,257.12 40,851,085.44
- Ø 300 mm Karet Packing unit 13.00 45,320.00 589,160.00
- M24 Baut mur set 192.00 44,187.00 8,483,904.00
Perpipaan Drain dan Overflow
- Ø 350 mm x 0,60 m' Double fl - fl ( Wall pipa ) unit 3.00 6,215,638.00 18,646,914.00
- Ø 350 mm Steel pipe SCH.40 m' 7.00 3,363,656.73 23,545,597.08
- Ø 350 mm DI Gate Valve metal resilient Seated all flange unit 1.00 29,960,409.60 29,960,409.60
- Ø 350 mm Dismantling Joint/Adaptor unit 1.00 3,535,294.40 3,535,294.40
- Ø 350 mm x Ø 350 mm Tee steel unit 1.00 3,843,840.00 3,843,840.00
- Ø 350 mm x 90 Steel Bend fl - fl unit 2.00 2,956,800.00 5,913,600.00
- Ø 350 mm Flange las unit 15.00 4,040,278.00 60,604,170.00
- Ø 350 mm Karet Packing unit 15.00 62,315.00 934,725.00
- M24 Baut mur set 240.00 44,187.00 10,604,880.00
- Manhole plat besi T=1.2 MM unit 3.00 1,706,292.50 5,118,877.50
- Pipa Vent unit 3.00 286,000.00 858,000.00
- Ø 50 mm pipa Drainase PVC m 2.00 101,062.50 202,125.00
Jumlah 395,098,398.49

b Pemasangan mekanikal dan aksesoris


Perpipaan Inlet
- Ø 350 mm Steel pipe SCH.40 m 24.00 21,896.31 525,511.54
- Ø 350 mm Flange las unit 4.00 521,723.13 2,086,892.50
- Ø 350 mm x 90 Steel Bend fl - fl unit 4.00 99,253.00 397,012.00
- Ø 350 mm x 0,60 m' Double fl - fl ( Wall pipa ) unit 1.00 129,910.00 129,910.00
- Ø 350 mm Karet Packing unit 7.00 1,561.66 10,931.59
- M24 Baut mur set 64.00 892.38 57,112.00
Perpipaan Outlet
- Ø 300 mm x 0,60 m' Double fl - fl ( Wall pipa ) unit 2.00 136,620.00 273,240.00
- Ø 300 mm Steel pipe SCH.40 m' 3.00 196,303.35 588,910.05
- Ø 300 mm DI Gate Valve metal resilient Seated all flange unit 1.00 215,176.50 215,176.50
- Ø 300 mm Dismantling Joint/Adaptor unit 1.00 214,901.50 214,901.50
- Ø 300 mm Water meter unit 1.00 214,901.50 214,901.50
- Ø 300 mm Strainer unit 1.00 129,827.50 129,827.50
- Ø 300 mm Saringan unit 1.00 129,827.50 129,827.50
- Ø 300 mm x 90 Steel Bend fl - fl unit 1.00 136,620.00 136,620.00
- Ø 300 mm Flange las unit 12.00 521,723.13 6,260,677.50
- Ø 300 mm Karet Packing unit 13.00 1,561.66 20,301.53
- M24 Baut mur set 192.00 892.38 171,336.00
Perpipaan Drain dan Overflow
- Ø 350 mm x 0,60 m' Double fl - fl ( Wall pipa ) unit 3.00 129,910.00 389,730.00
- Ø 350 mm Steel pipe SCH.40 m' 7.00 21,896.31 153,274.20
- Ø 350 mm DI Gate Valve metal resilient Seated all flange unit 1.00 215,176.50 215,176.50
- Ø 350 mm Dismantling Joint/Adaptor unit 1.00 104,489.00 104,489.00
- Ø 350 mm x Ø 350 mm Tee steel unit 1.00 521,723.13 521,723.13
- Ø 350 mm x 90 Steel Bend fl - fl unit 2.00 99,253.00 198,506.00
- Ø 350 mm Flange las unit 15.00 521,723.13 7,825,846.88
- Ø 350 mm Karet Packing unit 15.00 1,561.66 23,424.84
- M24 Baut mur set 240.00 892.38 214,170.00
- Manhole plat besi T=1.2 MM unit 3.00 93,749.59 281,248.77
- Pipa Vent unit 3.00 44,187.00 132,561.00
- Ø 50 mm pipa Drainase PVC m 2.00 44,187.00 88,374.00
Jumlah 21,711,613.52
c Pengadaan Elektrikal dan Accesories
Panel Penerangan Pos Jaga (PP-PJ)
- Box Plastic mini pragma pintu tranparant, inbow, 12 modul Unit 1.00 186,780.00 186,780.00
- MCB 3P/16A 10 KA unit 1.00 190,129.50 190,129.50
- RCCB/ELCB, 4P, 25A, Sensitifitas : 30 mA unit 1.00 568,551.50 568,551.50
- MCB 1P/6A 6 KA unit 4.00 40,414.00 161,656.00
- MCB 1P/10A 6 KA unit 1.00 40,414.00 40,414.00
- Box plastic mini pragma pintu transparant, inbow, 12 modul unit 1.00 308,000.00 308,000.00
- MCB 1P/16A 6 KA unit 1.00 200,200.00 200,200.00
- RCCB/ELCB, 2P, 16A, Sensitifitas : 30 mA unit 1.00 1,074,150.00 1,074,150.00
- MCB 1P/4A 6 KA unit 6.00 161,700.00 970,200.00
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 807,660.48 807,660.48
Penerangan Ruang Pos Jaga
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 396,000.00 396,000.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 528,000.00 528,000.00
- Single switch 10 A/ 220V plano unit 6.00 18,700.00 112,200.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Double Switch 10 A/ 220V plano unit 2.00 23,100.00 46,200.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 4.00 253,605.40 1,014,421.58
- Kabel NYM 3 x 2,5 mm2 m 80.00 14,300.00 1,144,000.00
- uPVC Conduit 20 m m 70.00 8,635.00 604,450.00
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
- Lampu TL 2 X 18W/WP unit 9.00 65,450.00 589,050.00
- Lampu jalan 50 W /SINGEL unit 12.00 513,128.00 6,157,536.00
- Outlet 10 A/2P+E 220V unit 6.00 170,940.00 1,025,640.00
- Single switch 10 A/ 220V plano unit 6.00 18,700.00 112,200.00
- Kabel dari P. Penerangan ke PJU
- - NYFGBY 3 x 2,5 mm2 meter 280.00 43,274.00 12,116,720.00
- Kabel dari P. Penerangan ke Lampu Taman
- - NYFGBY 3 x 2,5 mm2 meter 130.00 43,274.00 5,625,620.00
- Kabel dari P. Penerangan ke lampu stop kontak Penguras
- - NYFGBY 3 x 2,5 mm2 meter 90.00 43,274.00 3,894,660.00
- Junction Box untuk kabel NYFGBY ke NYM unit 1.00 1,099,560.00 1,099,560.00
- Instalasi titik lampu titik 15.00 589,050.00 8,835,750.00
- Instalasi titik lampu jalan titik 12.00 589,050.00 7,068,600.00
- Instalasi stop kontak titik 6.00 392,700.00 2,356,200.00
Jumlah 57,269,749.06
d Pemasangan Elektrikal dan Accesories
Panel Penerangan Pos Jaga (PP-PJ)
- Perakitan dan Pemasangan lengkap termasuk aksesoris set 1.00 807,660.48 807,660.48
Penerangan Ruang Pos Jaga
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 4.00 24,200.00 96,800.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 24,200.00
- Titik Lampu titik 2.00 72,689.44 145,378.88
Penyambungan Listrik PLN
- Uang Jaminan Pelanggan VA 4,400.00 272.25 1,197,900.00
- Biaya penyambungan VA 4,400.00 555.50 2,444,200.00
- Biaya installatir termasuk Sertifikasi Laik Operasi VA 4,400.00 145.20 638,880.00
- Biaya konstruksi dan peralatan penunjang LS 1.00 226,671,423.94 226,671,423.94
Jumlah 232,082,983.30

e Pengadaan Elektrikal dan Accesories


Panel Penerangan Pos Jaga (PP-PJ)
- Box Plastic mini pragma pintu tranparant, inbow, 12 modul Unit 1.00 186,780.00 186,780.00
- MCB 3P/16A 10 KA unit 1.00 190,129.50 190,129.50
- RCCB/ELCB, 4P, 25A, Sensitifitas : 30 mA unit 1.00 568,551.50 568,551.50
- MCB 1P/6A 6 KA unit 4.00 40,414.00 161,656.00
- MCB 1P/10A 6 KA unit 1.00 40,414.00 40,414.00
Penerangan Toilet
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 396,000.00 396,000.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 528,000.00 528,000.00
- Single switch 10 A/ 220V plano unit 8.00 18,700.00 149,600.00
- Double Switch 10 A/ 220V plano unit 2.00 23,100.00 46,200.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 6.00 253,605.40 1,521,632.38
- Kabel NYM 3 x 2,5 mm2 m 200.00 14,300.00 2,860,000.00
- uPVC Conduit 20 m m 75.00 8,635.00 647,625.00
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
Penerangan Ruang Pos Jaga
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 396,000.00 396,000.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 528,000.00 528,000.00
- Single switch 10 A/ 220V plano unit 6.00 18,700.00 112,200.00
- Double Switch 10 A/ 220V plano unit 2.00 23,100.00 46,200.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 4.00 253,605.40 1,014,421.58
- Kabel NYM 3 x 2,5 mm2 m 80.00 14,300.00 1,144,000.00
- uPVC Conduit 20 m m 70.00 8,635.00 604,450.00
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
- Panel Lokal Valve Sedimentasi 0
- Penangkal Petir type Elctrode dengan Rmin = 60m LS 1.00 10,822,650.43 10,822,650.43
- Grounding Anchor Rot 4 meter (3/4) unit 5.00 770,000.00 3,850,000.00
- - NYA 50 mm2 meter 10.00 150,150.00 1,501,500.00
- Clamp Anchor Rot 50 mm2 unit 2.00 16,940.00 33,880.00
- Air terminal Ø 1, termasuk dudukan, komplit set 1.00 686,511.41 686,511.41
- GIP Ø 3 unit 1.00 1,811,040.00 1,811,040.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- GIP Ø 2 unit 1.00 123,200.00 123,200.00
- Box control 30x30x70 cm unit 1.00 848,043.50 848,043.50
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 807,660.48 807,660.48
- Pengesahan Depnaker LS 1.00 4,620,000.00 4,620,000.00
Jumlah 36,316,745.78

f Pemasangan Elektrikal dan Accesories


Panel Penerangan Pos Jaga (PP-PJ)
- Perakitan dan Pemasangan lengkap termasuk aksesoris set 1.00 807,660.48 807,660.48
- Penerangan Toilet
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 6.00 24,200.00 145,200.00
- Titik Lampu titik 2.00 72,689.44 145,378.88
Penerangan Ruang Pos Jaga
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 4.00 24,200.00 96,800.00
- Titik Lampu titik 2.00 72,689.44 145,378.88
Jumlah 1,501,898.24
g Pengadaan Lampu penerangan luar
Dari panel PP-LR1
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 2,464,000.00 41,888,000.00
- Tiang lampu hot dip galvanis 6 m set 17.00 2,200,000.00 37,400,000.00
- Kabel NYFGbY 3 x 4 mm2 m 15.00 26,950.00 404,250.00
- Kabel NYFGbY 3 x 2,5 mm2 m 185.00 18,700.00 3,459,500.00
- Kabel NYFGbY 2 x 2,5 mm2 m 100.00 15,950.00 1,595,000.00
- GIP 2" m 6.00 123,200.00 739,200.00
Dari panel PP-LR2
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 2,464,000.00 41,888,000.00
- Tiang lampu hot dip galvanis 6 m set 17.00 2,200,000.00 37,400,000.00
- Kabel NYFGbY 4 x 4 mm2 m 30.00 31,900.00 957,000.00
- Kabel NYFGbY 3 x 4 mm2 m 50.00 26,950.00 1,347,500.00
- Kabel NYFGbY 3 x 2,5 mm2 m 50.00 18,700.00 935,000.00
- Kabel NYFGbY 4 x 2,5 mm2 m 60.00 22,000.00 1,320,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 40.00 15,950.00 638,000.00
Dari panel PP-LR3
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 2,464,000.00 41,888,000.00
- Kabel NYFGbY 3 x 2,5 mm2 m 150.00 18,700.00 2,805,000.00
- Kabel NYFGbY 4 x 4 mm2 m 50.00 31,900.00 1,595,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 220.00 15,950.00 3,509,000.00
- 5. GIP 2" m 6.00 123,200.00 739,200.00
- Tiang lampu hot dip galvanis 6 m set 8.00 2,200,000.00 17,600,000.00
Jumlah 238,107,650.00
h Pemasangan Lampu penerangan luar
Dari panel PP-LR1
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 807,660.48 13,730,228.16
- Kabel NYFGbY 3 x 4 mm2 m 15.00 30,800.00 462,000.00
- Kabel NYFGbY 3 x 2,5 mm2 m 185.00 30,800.00 5,698,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 100.00 30,800.00 3,080,000.00
Dari panel PP-LR2
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 807,660.48 13,730,228.16
- Kabel NYFGbY 4 x 4 mm2 m 30.00 30,800.00 924,000.00
- Kabel NYFGbY 3 x 4 mm2 m 50.00 30,800.00 1,540,000.00
- Kabel NYFGbY 3 x 2,5 mm2 m 50.00 30,800.00 1,540,000.00
- Kabel NYFGbY 4 x 2,5 mm2 m 60.00 30,800.00 1,848,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 40.00 30,800.00 1,232,000.00
Dari panel PP-LR3
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 807,660.48 13,730,228.16
- Kabel NYFGbY 3 x 2,5 mm2 m 150.00 30,800.00 4,620,000.00
- Kabel NYFGbY 4 x 4 mm2 m 50.00 30,800.00 1,540,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 220.00 30,800.00 6,776,000.00
Jumlah 70,450,684.48
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6

BANGUNAN RESERVOIR TANGGUNG WISIA Err:509


Err:509
A BANGUNAN RESERVOIR KAPASITAS 600 M3
1 Pekerjaan Tanah
1 Pengukuran dan Pasang Bowplank m' 74.60 - -
2 Galian Tanah dengan excavator m3 414.45 - -
3 Urugan Tanah Kembali dengan Pemadatan m3 67.45 - -
4 Urugan Pasir t = 10 cm m3 21.13 - -
Jumlah -
2 PEKERJAAN STRUKTUR ATAU SIPIL DAN ASITEKTUR
a Pekerjaan Beton
2 Lantai Kerja K - 125 (1 PC : 3 PS : 5KR)
- Cor Beton Camp 1:3:5 m3 21.13 - -
4 Pekerjaan Sloof
- Beton Cor K-300 m3 8.25 - -
- Pekerjaan Besi Beton Kg 2,056.71 - -
- Begesting Pasangan Batako m2 71.98 - -
5 Pekerjaan Beton Lantai
- Beton Cor K-300 m3 52.31 - -
- besi Beton Kg 7,768.72 - -
6 Pekerjaan Beton Kolom
- Beton Cor K-300 m3 8.35 - -
- besi Beton Kg 2,095.07 - -
- Begesting 2 X pakai m2 145.53 - -
7 Pekerjaan Beton Dinding
- Beton Cor K-300 m3 57.25 - -
- besi Beton Kg 6,487.49 - -
- Begesting 2 X pakai m2 572.52 - -
- Pekerjaan Tie Rod pada Bekisting Vertikal m1 448.00 - -
9 Pekerjaan Beton Balok
- Beton Cor K-300 m3 7.53 - -
- besi Beton Kg 1,986.44 - -
- Begesting 2 X pakai m2 105.46 - -
###Pekerjaan Beton Plat Atap
- Beton Cor K-300 m3 20.92 - -
- besi Beton Kg 3,859.74 - -
- Begesting m2 209.23 - -
Jumlah -

b Pekerjaan Pasangan dan Pelapis


###Pekerjaan Pas, Dinding Bata Merah m2 130.73 - -
###Pekerjaan Water Proofing m2 966.17 - -
###Pekerjaan Water Stop m 301.30 - -
###Pekerjaan Plesteran 1 PC : 2 Ps m2 1,006.23 - -
###Pekerjaan Acian m2 40.06 - -
Jumlah -

c Pekerjaan Kusen Pintu dan Relling


###Pekerjaan Pipa Ventilasi GIP 4" Unit 4.00 750,000.00 3,000,000.00
###Pekerjaan Penutup Man Hole Plat Besi T= 1.2 mm Unit 5.00 Err:509 Err:509
###Pekerjaan Tangga Inspeksi Pipa GIP Unit 4.00 Err:509 Err:509
Pekerjaan Tangga Besi Kg 161.45 - -
Jumlah Err:509
3 PEKERJAAN PIPA DAN ACCESSORIES
Pengadaan
Pipa In Flow Pipa Baja Three layer Polythylene dia.OD 355,6 mm, tebal dind m 53.10 - -
Pipa Over Flow dan Penguras Pipa Baja Three layer Polythylene dia.OD 355 m 57.83 - -
Pipa Out Flow Pipa Baja Three layer Polythylene dia.OD 355,6 mm, tebal di m 55.02 - -
Bend 90° Three Layer Polythelene dia OD 355,6 mm, tebal dinding 5,16 mm bh 7.00 - -
Tee OD 355,6 X 355,6 bh 1.00 - -
Strainer Y OD Ø 355,6 bh 1.00 - -
AF Gate Valve PN 16 dia. 14'' bh 3.00 - -
Dismantling Joint dia. 14'' bh 3.00 - -
Watermeter dia. 14'' bh 1.00 Err:509 Err:509
Saringan dia. 14'' bh 1.00 3,500,000.00 3,500,000.00
Pemasangan
Pipa In Flow Pipa Baja Three layer Polythylene dia.OD 355,6 mm, tebal dind m 53.10 - -
Pipa Over Flow dan Penguras Pipa Baja Three layer Polythylene dia.OD 355 m 57.83 - -
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
Pipa Out Flow Pipa Baja Three layer Polythylene dia.OD 355,6 mm, tebal di m 55.02 - -
Bend 90° Three Layer Polythelene dia OD 355,6 mm, tebal dinding 5,16 mm bh 7.00 60,000.00 420,000.00
Tee OD 355,6 X 355,6 bh 1.00 60,000.00 60,000.00
Strainer Y OD Ø 355,6 bh 1.00 60,000.00 60,000.00
AF Gate Valve PN 16 dia. 14'' bh 3.00 60,000.00 180,000.00
Dismantling Joint dia. 14'' bh 3.00 60,000.00 180,000.00
Watermeter dia. 14'' bh 1.00 60,000.00 60,000.00
Saringan dia. 14'' bh 1.00 60,000.00 60,000.00
Jumlah Err:509

9,394,638.00
B POS JAGA
1 PEKERJAAN TANAH
1 Pengukuran dan Pasang Bowplank m' 32.40 - -
2 Galian Tanah dengan excavator m3 23.35 - -
3 Urugan Tanah Kembali dengan Pemadatan m3 10.48 - -
4 Urugan Pasir t = 10 cm m3 1.13 - -
1 Pek. Urugan Tanah Peninggian Lantai m3 1.50 - -
2 Pek. Urugan Pasir Lantai Kerja m3 1.07 - -
Jumlah -
2 PEKERJAAN STRUKTUR ATAU SIPIL DAN ASITEKTUR
a Pekerjaan Beton
2 Lantai Kerja K - 125 (1 PC : 3 PS : 5KR)
- Cor Beton Camp 1:3:5 m3 1.07 - -
4 Pekerjaan Sloof
- Beton Cor K-300 m3 1.44 - -
- Pekerjaan Besi Beton Kg 163.30 - -
- Begesting Pasangan Batako m2 14.35 - -
6 Pekerjaan Beton Kolom
- Beton Cor K-300 m3 0.96 - -
- besi Beton Kg 193.49 - -
- Begesting 2 X pakai m2 25.51 - -
9 Pekerjaan Beton Balok
- Beton Cor K-300 m3 1.57 - -
- besi Beton Kg 273.81 - -
- Begesting 2 X pakai m2 29.94 - -
9 Pekerjaan Beton Plat Atap
- Beton Cor K-300 m3 1.79 - -
- besi Beton Kg 419.47 - -
- Begesting 1 X pakai m2 14.88 - -
9 Pekerjaan Beton Lisplank
- Beton Cor K-300 m3 0.61 - -
- besi Beton Kg 249.26 - -
- Begesting 2 X pakai m2 13.76 - -
9 Pekerjaan Meja Beton
- Beton Cor K-300 m3 0.10 - -
- besi Beton Kg 25.69 - -
- Begesting 2 X pakai m2 1.95 - -
Jumlah -
b Pekerjaan Pasangan dan Pelapis
Pekerjaan Pasangan Batu Kosong m3 3.40 - -
Pekerjaan Pasangan Batu Kali Camp 1 : 5 m3 9.04 - -
###Pekerjaan Pasangan Bata Camp 1:5 m2 99.88 - -
Pekerjaan Trasram m2 13.68 - -
###Pekerjaan Plesteran 1 PC : 5 PS m2 199.76 - -
###Pekerjaan Acian m2 199.76 - -
Pekerjaan Cat Dinding m2 199.76 - -
1 Pek. Pas. Batu Alam Random m2 13.76 - -
2 Pek. Tempelan Batu Candi m2 30.83 - -
Jumlah -
c Pekerjaan Atap
###Pekerjaan Rangka Kuda-Kuda Atap m3 0.46 - -
###Pekerjaan Usuk dan Reng m2 53.04 - -
###Pekerjaan Pasangan Atap Genteng m2 18.71 - -
Pekerjaan Pas Bubungan m' 22.15 - -
Pekerjaan Pas. Ikut Celedu unit 4.00 - -
Pekerjaan Pas. Murda unit 2.00 - -
Pekerjaan Pas. Listplank m' 19.40 - -
Pekerjaan Pas. Tatab m' 19.72 - -
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
Pek. Cat Listplank m2 9.70 - -
Jumlah -
d Pekerjaan Langit-Langit
###Pas. Plafond Kasiboard Rangka Hollow m3 21.37 - -
###Pas. List Gypsum m' 37.60 - -
###Pek. Cat Plafond m2 21.37 - -
Jumlah -
e Pekerjaan Penutup Lantai
###Pas.Keramik 30 x 30 cm m2 20.68 - -
###Pas. Keramik 20x30 cm m2 2.25 - -
Pas. Keramik Dinding m2 12.60 - -
###Pas. Stepnozing m' 6.00 - -
Jumlah -
f Pekerjaan Kusen Pintu dan Jendela
###Pas. Kusen Kayu Kamper m3 0.23 - -
###Pas. Daun Pintu Kayu Kamper m2 5.19 - -
###Pas. Jendela Kaca m2 1.76 - -
Pas. Kaca Bening t = 5 mm m2 0.78 - -
###Pas. Engsel Pintu set 6.00 - -
Pas. Grendel Pintu unit 2.00 - -
###Pas. Handle & Kunci Pintu m' 2.00 - -
Pas. Engsel Jendela unit 8.00 - -
Pas. Grendel Jendela unit 4.00 - -
Pas. Kait Angin unit 8.00 - -
Pek. Polituran m2 28.50 - -
Jumlah -
g Pekerjaan Toilet
1 Instalasi Plumbing Air Bersih m 25.00 42,900.00 1,072,500.00
2 Instalasi Plumbing Air Kotor m 36.00 231,170.50 8,322,138.00
3 Closet duduk bh 1.00 - -
4 Pasang Washtafel set 1.00 - -
5 Pasang Floor Drain set 1.00 - -
6 Pasang Kran air set 2.00 - -
Pekerjaan Septiktank unit 1.00 - -
Pekerjaan Peresapan unit 1.00 - -
Jumlah 9,394,638.00

C PAGAR DAN LANSCAPE -


Pengukuran dan Pasang Bowplank m' 82.60 - -
Galian Tanah dengan excavator m3 21.06 - -
Urugan Tanah Kembali dengan Pemadatan m3 21.81 - -
Urugan Pasir t = 10 cm m3 1.24 - -
Pekerjaan Pasangan Batu Kosong m3 3.72 - -
Pekerjaan Pasangan Batu Kali Camp 1 : 5 m3 13.63 - -
Pekerjaan Sloof
- Beton Cor K-300 m3 4.14 - -
- Pekerjaan Besi Beton Kg 458.76 - -
- Begesting 2 X pakai m2 41.35 - -
Pekerjaan Beton Kolom
- Beton Cor K-300 m3 4.14 - -
- besi Beton Kg 458.76 - -
- Begesting 2 X pakai m2 41.35 - -
Pekerjaan Beton Balok
- Beton Cor K-300 m3 1.50 - -
- besi Beton Kg 263.42 - -
- Begesting 2 X pakai m2 39.90 - -
###Pekerjaan Pasangan Bata Camp 1:5 m2 115.64 - -
###Pekerjaan Plesteran 1 PC : 5 PS m2 384.09 - -
###Pekerjaan Acian m2 384.09 - -
Pekerjaan Paving t=8 mm, K225 m2 385.63 - -
Jumlah -

1,082,095,518.01
D PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
Pengadaan mekanikal dan aksesoris
Perpipaan Inlet
- Ø 350 mm Steel pipe SCH.40 m 26.00 3,363,656.73 87,455,074.85
- Ø 350 mm Flange las unit 4.00 4,040,278.00 16,161,112.00
- Ø 350 mm x 90 Steel Bend fl - fl unit 4.00 2,956,800.00 11,827,200.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Ø 350 mm x 0,60 m' Double fl - fl ( Wall pipa ) unit 1.00 6,215,638.00 6,215,638.00
- Ø 350 mm Karet Packing unit 7.00 62,315.00 436,205.00
- M24 Baut mur set 64.00 44,187.00 2,827,968.00
Perpipaan Outlet
- Ø 350 mm x 0,60 m' Double fl - fl ( Wall pipa ) unit 2.00 6,215,638.00 12,431,276.00
- Ø 350 mm Steel pipe SCH.40 m' 3.00 3,363,656.73 10,090,970.18
- Ø 350 mm DI Gate Valve metal resilient Seated all flange unit 1.00 29,960,409.60 29,960,409.60
- Ø 350 mm Dismantling Joint/Adaptor unit 1.00 3,535,294.40 3,535,294.40
- Ø 350 mm Water meter unit 1.00 5,021,500.00 5,021,500.00
- Ø 350 mm Strainer unit 1.00 7,318,080.00 7,318,080.00
- Ø 350 mm Saringan unit 1.00 7,640,325.00 7,640,325.00
- Ø 350 mm x 90 Steel Bend fl - fl unit 1.00 2,956,800.00 2,956,800.00
- Ø 350 mm Flange las unit 12.00 4,040,278.00 48,483,336.00
- Ø 350 mm Karet Packing unit 13.00 62,315.00 810,095.00
- M24 Baut mur set 192.00 44,187.00 8,483,904.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
Perpipaan Drain dan Overflow
- Ø 350 mm x 0,60 m' Double fl - fl ( Wall pipa ) unit 3.00 6,215,638.00 18,646,914.00
- Ø 350 mm Steel pipe SCH.40 m' 7.00 3,363,656.73 23,545,597.08
- Ø 350 mm DI Gate Valve metal resilient Seated all flange unit 1.00 29,960,409.60 29,960,409.60
- Ø 350 mm Dismantling Joint/Adaptor unit 1.00 3,535,294.40 3,535,294.40
- Ø 350 mm x Ø 350 mm Tee steel unit 1.00 3,843,840.00 3,843,840.00
- Ø 350 mm x 90 Steel Bend fl - fl unit 2.00 2,956,800.00 5,913,600.00
- Ø 350 mm Flange las unit 15.00 4,040,278.00 60,604,170.00
- Ø 350 mm Karet Packing unit 15.00 62,315.00 934,725.00
- M24 Baut mur set 240.00 44,187.00 10,604,880.00
- Manhole plat besi T=1.2 MM unit 3.00 1,706,292.50 5,118,877.50
- Pipa Vent unit 3.00 286,000.00 858,000.00
- Ø 50 mm pipa Drainase PVC m 2.00 101,062.50 202,125.00
Jumlah 425,423,620.60

Pemasangan mekanikal dan aksesoris


Perpipaan Inlet
- Ø 350 mm Steel pipe SCH.40 m 26.00 21,896.31 569,304.16
- Ø 350 mm Flange las unit 4.00 521,723.13 2,086,892.50
- Ø 350 mm x 90 Steel Bend fl - fl unit 4.00 99,253.00 397,012.00
- Ø 350 mm x 0,60 m' Double fl - fl ( Wall pipa ) unit 1.00 129,910.00 129,910.00
- Ø 350 mm Karet Packing unit 7.00 1,561.66 10,931.59
- M24 Baut mur set 64.00 892.38 57,112.00
Perpipaan Outlet
- Ø 350 mm x 0,60 m' Double fl - fl ( Wall pipa ) unit 2.00 129,910.00 259,820.00
- Ø 350 mm Steel pipe SCH.40 m' 3.00 21,896.31 65,688.94
- Ø 350 mm DI Gate Valve metal resilient Seated all flange unit 1.00 215,176.50 215,176.50
- Ø 350 mm Dismantling Joint/Adaptor unit 1.00 104,489.00 104,489.00
- Ø 350 mm Water meter unit 1.00 129,827.50 129,827.50
- Ø 350 mm Strainer unit 1.00 129,827.50 129,827.50
- Ø 350 mm Saringan unit 1.00 86,102.50 86,102.50
- Ø 350 mm x 90 Steel Bend fl - fl unit 1.00 99,253.00 99,253.00
- Ø 350 mm Flange las unit 12.00 521,723.13 6,260,677.50
- Ø 350 mm Karet Packing unit 13.00 1,561.66 20,301.53
- M24 Baut mur set 192.00 892.38 171,336.00
Perpipaan Drain dan Overflow
- Ø 350 mm x 0,60 m' Double fl - fl ( Wall pipa ) unit 3.00 129,910.00 389,730.00
- Ø 350 mm Steel pipe SCH.40 m' 7.00 21,896.31 153,274.20
- Ø 350 mm DI Gate Valve metal resilient Seated all flange unit 1.00 215,176.50 215,176.50
- Ø 350 mm Dismantling Joint/Adaptor unit 1.00 104,489.00 104,489.00
- Ø 350 mm x Ø 350 mm Tee steel unit 1.00 521,723.13 521,723.13
- Ø 350 mm x 90 Steel Bend fl - fl unit 2.00 99,253.00 198,506.00
- Ø 350 mm Flange las unit 15.00 521,723.13 7,825,846.88
- Ø 350 mm Karet Packing unit 15.00 1,561.66 23,424.84
- M24 Baut mur set 240.00 892.38 214,170.00
- Manhole plat besi T=1.2 MM unit 3.00 93,749.59 281,248.77
- Pipa Vent unit 3.00 44,187.00 132,561.00
- Ø 50 mm pipa Drainase PVC m 2.00 44,187.00 88,374.00
Jumlah 20,942,186.54
Pengadaan Elektrikal dan Accesories
Panel Penerangan Pos Jaga (PP-PJ)
- Box Plastic mini pragma pintu tranparant, inbow, 12 modul Unit 1.00 186,780.00 186,780.00
- MCB 3P/16A 10 KA unit 1.00 190,129.50 190,129.50
- RCCB/ELCB, 4P, 25A, Sensitifitas : 30 mA unit 1.00 568,551.50 568,551.50
- MCB 1P/6A 6 KA unit 4.00 40,414.00 161,656.00
- MCB 1P/10A 6 KA unit 1.00 40,414.00 40,414.00
- Box plastic mini pragma pintu transparant, inbow, 12 modul unit 1.00 308,000.00 308,000.00
- MCB 1P/16A 6 KA unit 1.00 200,200.00 200,200.00
- RCCB/ELCB, 2P, 16A, Sensitifitas : 30 mA unit 1.00 1,074,150.00 1,074,150.00
- MCB 1P/4A 6 KA unit 6.00 161,700.00 970,200.00
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 807,660.48 807,660.48
Penerangan Ruang Pos Jaga
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 396,000.00 396,000.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 528,000.00 528,000.00
- Single switch 10 A/ 220V plano unit 6.00 18,700.00 112,200.00
- Double Switch 10 A/ 220V plano unit 2.00 23,100.00 46,200.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 4.00 253,605.40 1,014,421.58
- Kabel NYM 3 x 2,5 mm2 m 80.00 14,300.00 1,144,000.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- uPVC Conduit 20 m m 70.00 8,635.00 604,450.00
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
- Lampu TL 2 X 18W/WP unit 9.00 65,450.00 589,050.00
- Lampu jalan 50 W /SINGEL unit 12.00 513,128.00 6,157,536.00
- Outlet 10 A/2P+E 220V unit 6.00 170,940.00 1,025,640.00
- Single switch 10 A/ 220V plano unit 6.00 18,700.00 112,200.00
- Kabel dari P. Penerangan ke PJU
- - NYFGBY 3 x 2,5 mm2 meter 280.00 43,274.00 12,116,720.00
- Kabel dari P. Penerangan ke Lampu Taman
- - NYFGBY 3 x 2,5 mm2 meter 130.00 43,274.00 5,625,620.00
- Kabel dari P. Penerangan ke lampu stop kontak Penguras
- - NYFGBY 3 x 2,5 mm2 meter 90.00 43,274.00 3,894,660.00
- Junction Box untuk kabel NYFGBY ke NYM unit 1.00 1,099,560.00 1,099,560.00
- Instalasi titik lampu titik 15.00 589,050.00 8,835,750.00
- Instalasi titik lampu jalan titik 12.00 589,050.00 7,068,600.00
- Instalasi stop kontak titik 6.00 392,700.00 2,356,200.00
Jumlah 57,269,749.06
Pemasangan Elektrikal dan Accesories 0
Panel Penerangan Pos Jaga (PP-PJ) 0
- Perakitan dan Pemasangan lengkap termasuk aksesoris set 1.00 807,660.48 807,660.48
Penerangan Ruang Pos Jaga 0
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 4.00 24,200.00 96,800.00
- Titik Lampu titik 2.00 72,689.44 145,378.88
Penyambungan Listrik PLN 0
- Uang Jaminan Pelanggan VA 4,400.00 272.25 1,197,900.00
- Biaya penyambungan VA 4,400.00 555.50 2,444,200.00
- Biaya installatir termasuk Sertifikasi Laik Operasi VA 4,400.00 145.20 638,880.00
- Biaya konstruksi dan peralatan penunjang LS 1.00 226,671,423.94 226,671,423.94
Jumlah 232,082,983.30

Pengadaan Elektrikal dan Accesories


Panel Penerangan Pos Jaga (PP-PJ)
- Box Plastic mini pragma pintu tranparant, inbow, 12 modul Unit 1.00 186,780.00 186,780.00
- MCB 3P/16A 10 KA unit 1.00 190,129.50 190,129.50
- RCCB/ELCB, 4P, 25A, Sensitifitas : 30 mA unit 1.00 568,551.50 568,551.50
- MCB 1P/6A 6 KA unit 4.00 40,414.00 161,656.00
- MCB 1P/10A 6 KA unit 1.00 40,414.00 40,414.00
Penerangan Toilet
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 396,000.00 396,000.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 528,000.00 528,000.00
- Single switch 10 A/ 220V plano unit 8.00 18,700.00 149,600.00
- Double Switch 10 A/ 220V plano unit 2.00 23,100.00 46,200.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 6.00 253,605.40 1,521,632.38
- Kabel NYM 3 x 2,5 mm2 m 200.00 14,300.00 2,860,000.00
- uPVC Conduit 20 m m 75.00 8,635.00 647,625.00
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
Penerangan Ruang Pos Jaga
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 396,000.00 396,000.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 528,000.00 528,000.00
- Single switch 10 A/ 220V plano unit 6.00 18,700.00 112,200.00
- Double Switch 10 A/ 220V plano unit 2.00 23,100.00 46,200.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 4.00 253,605.40 1,014,421.58
- Kabel NYM 3 x 2,5 mm2 m 80.00 14,300.00 1,144,000.00
- uPVC Conduit 20 m m 70.00 8,635.00 604,450.00
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
- Panel Lokal Valve Sedimentasi
- Penangkal Petir type Elctrode dengan Rmin = 60m LS 1.00 10,822,650.43 10,822,650.43
- Grounding Anchor Rot 4 meter (3/4) unit 5.00 770,000.00 3,850,000.00
- - NYA 50 mm2 meter 10.00 150,150.00 1,501,500.00
- Clamp Anchor Rot 50 mm2 unit 2.00 16,940.00 33,880.00
- Air terminal Ø 1, termasuk dudukan, komplit set 1.00 686,511.41 686,511.41
- GIP Ø 3 unit 1.00 1,811,040.00 1,811,040.00
- GIP Ø 2 unit 1.00 123,200.00 123,200.00
- Box control 30x30x70 cm unit 1.00 848,043.50 848,043.50
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 807,660.48 807,660.48
- Pengesahan Depnaker LS 1.00 4,620,000.00 4,620,000.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
Jumlah 36,316,745.78

Pemasangan Elektrikal dan Accesories


Panel Penerangan Pos Jaga (PP-PJ)
- Perakitan dan Pemasangan lengkap termasuk aksesoris set 1.00 807,660.48 807,660.48
- Penerangan Toilet
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 6.00 24,200.00 145,200.00
- Titik Lampu titik 2.00 72,689.44 145,378.88
Penerangan Ruang Pos Jaga
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 4.00 24,200.00 96,800.00
- Titik Lampu titik 2.00 72,689.44 145,378.88
Jumlah 1,501,898.24
Pengadaan Lampu penerangan luar
Dari panel PP-LR1
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 2,464,000.00 41,888,000.00
- Tiang lampu hot dip galvanis 6 m set 17.00 2,200,000.00 37,400,000.00
- Kabel NYFGbY 3 x 4 mm2 m 15.00 26,950.00 404,250.00
- Kabel NYFGbY 3 x 2,5 mm2 m 185.00 18,700.00 3,459,500.00
- Kabel NYFGbY 2 x 2,5 mm2 m 100.00 15,950.00 1,595,000.00
- GIP 2" m 6.00 123,200.00 739,200.00
Dari panel PP-LR2
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 2,464,000.00 41,888,000.00
- Tiang lampu hot dip galvanis 6 m set 17.00 2,200,000.00 37,400,000.00
- Kabel NYFGbY 4 x 4 mm2 m 30.00 31,900.00 957,000.00
- Kabel NYFGbY 3 x 4 mm2 m 50.00 26,950.00 1,347,500.00
- Kabel NYFGbY 3 x 2,5 mm2 m 50.00 18,700.00 935,000.00
- Kabel NYFGbY 4 x 2,5 mm2 m 60.00 22,000.00 1,320,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 40.00 15,950.00 638,000.00
Dari panel PP-LR3
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 2,464,000.00 41,888,000.00
- Kabel NYFGbY 3 x 2,5 mm2 m 150.00 18,700.00 2,805,000.00
- Kabel NYFGbY 4 x 4 mm2 m 50.00 31,900.00 1,595,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 220.00 15,950.00 3,509,000.00
- 5. GIP 2" m 6.00 123,200.00 739,200.00
- Tiang lampu hot dip galvanis 6 m set 8.00 2,200,000.00 17,600,000.00
Jumlah 238,107,650.00
Pemasangan Lampu penerangan luar
Dari panel PP-LR1
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 807,660.48 13,730,228.16
- Kabel NYFGbY 3 x 4 mm2 m 15.00 30,800.00 462,000.00
- Kabel NYFGbY 3 x 2,5 mm2 m 185.00 30,800.00 5,698,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 100.00 30,800.00 3,080,000.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
Dari panel PP-LR2
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 807,660.48 13,730,228.16
- Kabel NYFGbY 4 x 4 mm2 m 30.00 30,800.00 924,000.00
- Kabel NYFGbY 3 x 4 mm2 m 50.00 30,800.00 1,540,000.00
- Kabel NYFGbY 3 x 2,5 mm2 m 50.00 30,800.00 1,540,000.00
- Kabel NYFGbY 4 x 2,5 mm2 m 60.00 30,800.00 1,848,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 40.00 30,800.00 1,232,000.00
Dari panel PP-LR3
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 807,660.48 13,730,228.16
- Kabel NYFGbY 3 x 2,5 mm2 m 150.00 30,800.00 4,620,000.00
- Kabel NYFGbY 4 x 4 mm2 m 50.00 30,800.00 1,540,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 220.00 30,800.00 6,776,000.00
Jumlah 70,450,684.48

BANGUNAN RESERVOIR SUBUK Err:509


Err:509
A BANGUNAN RESERVOIR KAPASITAS 100 M3
1 PEKERJAAN TANAH
1 Pengukuran dan Pasang Bowplank m' 59.80 - -
2 Galian Tanah dengan excavator m3 267.32 - -
3 Urugan Tanah Kembali dengan Pemadatan m3 57.20 - -
4 Urugan Pasir t = 10 cm m3 12.87 - -
Jumlah -
2 PEKERJAAN STRUKTUR ATAU SIPIL DAN ASITEKTUR
a Pekerjaan Beton
2 Lantai Kerja K - 125 (1 PC : 3 PS : 5KR)
- Cor Beton Camp 1:3:5 m3 12.87 - -
4 Pekerjaan Sloof
- Beton Cor K-300 m3 4.99 - -
- Pekerjaan Besi Beton Kg 1,314.52 - -
- Begesting Pasangan Batako m2 44.58 - -
5 Pekerjaan Beton Lantai
- Beton Cor K-300 m3 52.31 - -
- besi Beton Kg 4,742.48 - -
6 Pekerjaan Beton Kolom
- Beton Cor K-300 m3 5.24 - -
- besi Beton Kg 1,328.09 - -
- Begesting 2 X pakai m2 91.08 - -
7 Pekerjaan Beton Dinding
- Beton Cor K-300 m3 41.71 - -
- besi Beton Kg 4,921.20 - -
- Begesting 2 X pakai m2 417.08 - -
- Pekerjaan Tie Rod pada Bekisting Vertikal m1 326.00 - -
9 Pekerjaan Beton Balok
- Beton Cor K-300 m3 4.79 - -
- besi Beton Kg 1,278.26 - -
- Begesting 2 X pakai m2 67.10 - -
###Pekerjaan Beton Plat Atap
- Beton Cor K-300 m3 12.67 - -
- besi Beton Kg 2,332.47 - -
- Begesting m2 126.66 - -
Jumlah -

b Pekerjaan Pasangan dan Pelapis


###Pekerjaan Pas, Dinding Bata Merah m2 53.90 - -
###Pekerjaan Water Proofing m2 652.23 - -
###Pekerjaan Water Stop m 191.70 - -
###Pekerjaan Plesteran 1 PC : 2 Ps m2 685.73 - -
###Pekerjaan Acian m2 33.51 - -
Jumlah -
c Pekerjaan Kusen Pintu dan Relling
###Pekerjaan Pipa Ventilasi GIP 4" Unit 4.00 750,000.00 3,000,000.00
###Pekerjaan Penutup Man Hole Plat Besi T= 1.2 mm Unit 5.00 Err:509 Err:509
###Pekerjaan Tangga Inspeksi Pipa GIP Unit 4.00 Err:509 Err:509
Pekerjaan Tangga Besi Kg 194.60 - -
Jumlah Err:509
3 PEKERJAAN PIPA DAN ACCESSORIES
Pengadaan
Pipa In Flow Pipa Baja Three layer Polythylene dia.ID 150 mm, m 53.10 1,306,500.00 69,375,150.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
Pipa Over Flow dan Penguras Pipa Baja Three layer Polythylene dia. ID 15 m 57.83 1,306,500.00 75,554,895.00
Pipa Out Flow Pipa Baja Three layer Polythylene dia.ID 150 mm m 55.02 1,306,500.00 71,883,630.00
Bend 90° Three Layer Polythelene dia ID 150 mm bh 7.00 3,604,346.94 25,230,428.55
Tee ID 150X150 bh 1.00 Err:509 Err:509
Strainer Y ID Ø 150 bh 1.00 Err:509 Err:509
AF Gate Valve PN 16 dia. 6'' bh 3.00 - -
Dismantling Joint dia. 6'' bh 3.00 Err:509 Err:509
Watermeter dia. 6'' bh 1.00 Err:509 Err:509
End Cap dia. 6'' bh 1.00 - -
Saringan dia. 6'' bh 1.00 3,500,000.00 3,500,000.00
Pemasangan
Pipa In Flow Pipa Baja Three layer Polythylene dia.ID 150 mm, m 53.10 - -
Pipa Over Flow dan Penguras Pipa Baja Three layer Polythylene dia. ID 15 m 57.83 - -
Pipa Out Flow Pipa Baja Three layer Polythylene dia.ID 150 mm m 55.02 - -
Bend 90° Three Layer Polythelene dia ID 150 mm bh 7.00 60,000.00 420,000.00
Tee ID 150X150 bh 1.00 60,000.00 60,000.00
Strainer Y ID Ø 150 bh 1.00 60,000.00 60,000.00
AF Gate Valve PN 16 dia. 6'' bh 3.00 60,000.00 180,000.00
Dismantling Joint dia. 6'' bh 3.00 60,000.00 180,000.00
Watermeter dia. 6'' bh 1.00 60,000.00 60,000.00
End Cap dia. 14'' bh 1.00 60,000.00 60,000.00
Saringan dia. 6'' bh 1.00 60,000.00 60,000.00
Jumlah Err:509

-
D PAGAR
Pengukuran dan Pasang Bowplank m' 22.23 - -
Galian Tanah dengan excavator m3 5.67 - -
Urugan Tanah Kembali dengan Pemadatan m3 5.87 - -
Urugan Pasir t = 10 cm m3 0.33 - -
Pekerjaan Pasangan Batu Kosong m3 1.00 - -
Pekerjaan Pasangan Batu Kali Camp 1 : 5 m3 3.67 - -
Pekerjaan Sloof
- Beton Cor K-300 m3 1.11 - -
- Pekerjaan Besi Beton Kg 123.42 - -
- Begesting 2 X pakai m2 11.13 - -
Pekerjaan Beton Kolom
- Beton Cor K-300 m3 1.11 - -
- besi Beton Kg 123.42 - -
- Begesting 2 X pakai m2 11.13 - -
Pekerjaan Beton Balok
- Beton Cor K-300 m3 0.32 - -
- besi Beton Kg 56.45 - -
- Begesting 2 X pakai m2 8.55 - -
###Pekerjaan Pasangan Bata Camp 1:5 m2 31.12 - -
###Pekerjaan Plesteran 1 PC : 5 PS m2 103.35 - -
###Pekerjaan Acian m2 103.35 - -
Pekerjaan Paving t=8 mm, K225 m2 114.00 - -
Jumlah -
2,592,043,291.02
D PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
a Pengadaan mekanikal dan aksesoris
Perpipaan Inlet
- Ø 700 mm x Ø 400 mm Steel Tee all flange unit 2.00 19,764,888.00 39,529,776.00
- Ø 700 mm Blank Flange unit 1.00 14,391,520.00 14,391,520.00
- Ø 700 mm Dismantling Joint/Adaptor unit 1.00 6,945,523.20 6,945,523.20
- Ø 700 mm Stell pipe SCH.40 m 18.00 5,626,698.00 101,280,564.00
- Ø 400 mm Butterfly Valve resilient seat all flange unit 2.00 66,813,120.00 133,626,240.00
- Ø 400 mm Flange las unit 4.00 748,000.00 2,992,000.00
- Ø 400 mm x 90 Steel Bend all flange unit 4.00 4,951,964.16 19,807,856.64
- Ø 400 mm x 1000 m' Double Flange ( Wall Pipe ) unit 2.00 7,814,400.00 15,628,800.00
- Ø 700 mm Karet Packing unit 5.00 56,100.00 280,500.00
- Ø 700 mm Karet Packing unit 1.00 56,100.00 56,100.00
- Ø 400 mm Karet Packing unit 10.00 35,816.00 358,160.00
- 1" x 5" Baud Mur set 120.00 29,700.00 3,564,000.00
- Ø 500 mm x 0,75 m' Pipa Inlet ( Wall Pipe ) Unit 2.00 10,348,800.00 20,697,600.00
- Ø 700 mm Flange las Unit 6.00 12,457,368.00 74,744,208.00
- Ø 500 mm Karet Packing Unit 2.00 42,988.00 85,976.00
- Ø 500 mm DI Gate Valve resilient seat lengkap dengan Floo Unit 2.00 105,494,400.00 210,988,800.00
- M30 Baud mur set 40.00 51,036.70 2,041,468.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- M39 Baud mur set 144.00 56,320.00 8,110,080.00
Pengadaan dan Pemasangan Extended Stem Valve set 2,383,562.50 -
Perpipaan Outlet 0 -
- Ø 700 mm x 0,60 m' Woll pipe fl - sp unit 1.00 10,428,000.00 10,428,000.00
- Ø 700 mm Steel pipe SCH.40 m' 10.00 5,626,698.00 56,266,980.00
- Ø 700 mm DI Gate Valve metal resilient Seated all flange unit 2.00 133,626,240.00 267,252,480.00
- Ø 700 mm x Ø 500 mm Stell Tee fl -fl unit 1.00 20,322,588.00 20,322,588.00
- Ø 700 mm x Ø 500 mm Steel Reducer unit 1.00 9,529,977.60 9,529,977.60
- Ø 700 mm x 90 Steel Bend fl - fl unit 2.00 16,060,000.00 32,120,000.00
- Box Kontrol Uk. 2,4x 1,5 x 1,5 m' unit 3.00 14,437,500.00 43,312,500.00
- Ø 700 mm Flange las unit 7.00 12,457,368.00 87,201,576.00
- Ø 500 mm Flange las unit 2.00 4,311,014.40 8,622,028.80
- Ø 500 mm Karet Packing unit 2.00 42,988.00 85,976.00
- Ø 700 mm Karet Packing unit 7.00 56,100.00 392,700.00
- M30 Baud mur set 40.00 51,036.70 2,041,468.00
- M39 Baud mur set 168.00 56,320.00 9,461,760.00
- Ø 300 mm Penguras PVC m' 150.57 1,175,625.00 177,013,856.25
Perpipaan Drain dan Overflow 0 -
- Ø 400 mm DI Gate Valve resilient seat all flange unit - 59,780,160.00 -
- Ø 400 mm Flange las unit 4.00 748,000.00 2,992,000.00
- Ø 400 mm Steel pipa SCH.40 m' 6.00 5,461,532.98 32,769,197.87
- Ø 300 mm pipa PVC untuk penguras m' 142.00 308,000.00 43,736,000.00
- Ø 400 mm x 90 Steel Bend fl - fl unit 2.00 4,951,964.16 9,903,928.32
- Ø 400 mm x 1000 mm' Double Flange ( Wall Pipe ) unit 2.00 7,814,400.00 15,628,800.00
- Ø 400 mm Karet Packing unit 4.00 35,816.00 143,264.00
- Ø 400 mm CI Bell mouth unit 2.00 2,566,080.00 5,132,160.00
- 1" x 5" Baud Mur set 336.00 29,700.00 9,979,200.00
- M27 Baud mur set 64.00 48,605.70 3,110,764.80
- M24 Baud mur set 132.00 44,187.00 5,832,684.00
- Bak Kontrol Pipa Penguras unit 1.00 14,437,500.00 14,437,500.00
- Ø 300 mm x 750 mm double Flange ( wall pipe ) unit 2.00 2,354,880.00 4,709,760.00
- A.F. Gate Valve PN 10 Ø 300 mm unit 2.00 14,300,000.00 28,600,000.00
- Bend all flange 90° , Baja 300 mm, unit 2.00 1,872,200.00 3,744,400.00
- Ø 300 mm x Ø 300 mm Steel Tee fl - fl unit 1.00 3,843,840.00 3,843,840.00
- Ø 300 mm Steel Pipa Sch. 40 unit 38.50 2,598,676.66 100,049,051.53
- Ø 300 mm Flange las unit 6.00 880,000.00 5,280,000.00
- Ø 300 mm Karet Packing unit 11.00 36,850.00 405,350.00
- Ø 400 mm pipa PVC untuk penguras m 90.00 1,711,875.00 154,068,750.00
Jumlah 1,823,547,713.00
- -
b Pemasangan mekanikal dan aksesoris 0 -
Perpipaan Inlet 0 -
- Ø 700 mm x Ø 400 mm Steel Tee all flange unit 2.00 226,336.00 452,672.00
- Ø 700 mm Blank Flange unit 1.00 1,166,411.13 1,166,411.13
- Ø 700 mm Dismantling Joint/Adaptor unit 1.00 104,489.00 104,489.00
- Ø 700 mm Stell pipe SCH.40 m 14.50 386,455.10 5,603,598.98
- Ø 400 mm Butterfly Valve resilient seat all flange unit 2.00 215,336.00 430,672.00
- Ø 400 mm Flange las unit 4.00 680,927.50 2,723,710.00
- Ø 400 mm x 90 Steel Bend all flange unit 4.00 101,640.00 406,560.00
- Ø 400 mm x 1000 m' Double Flange ( Wall Pipe ) unit 2.00 139,975.00 279,950.00
- Ø 500 mm x 0,75 m' Pipa Inlet ( Wall Pipe ) Unit 2.00 139,975.00 279,950.00
- Ø 700 mm Flange las Unit 6.00 1,166,411.13 6,998,466.75
- Ø 500 mm Karet Packing Unit 2.00 1,561.66 3,123.31
- Ø 500 mm DI Gate Valve resilient seat lengkap dengan Floo Unit 2.00 246,664.00 493,328.00
- M30 Baud mur set 40.00 892.38 35,695.00
- M39 Baud mur set 144.00 892.38 128,502.00
- Ø 700 mm Karet Packing set 6.00 1,561.66 9,369.94
Perpipaan Outlet 0 - -
- Ø 700 mm x 0,60 m' Woll pipe fl - sp unit 2.00 139,975.00 279,950.00
- Ø 700 mm Steel pipe SCH.40 m' 6.00 386,455.10 2,318,730.61
- Ø 700 mm DI Gate Valve metal resilient Seated all flange unit 2.00 283,041.00 566,082.00
- Ø 700 mm x Ø 500 mm Stell Tee fl -fl unit 1.00 226,336.00 226,336.00
- Ø 700 mm x Ø 500 mm Steel Reducer unit 1.00 136,620.00 136,620.00
- Ø 700 mm x 90 Steel Bend fl - fl unit 2.00 136,620.00 273,240.00
- Box Kontrol Uk. 2,4x 1,5 x 1,5 m' unit 3.00 12,375,004.40 37,125,013.20
- Ø 700 mm Flange las unit 7.00 1,166,411.13 8,164,877.88
- Ø 500 mm Flange las unit 2.00 845,607.82 1,691,215.64
- Ø 500 mm Karet Packing unit 2.00 1,561.66 3,123.31
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Ø 700 mm Karet Packing unit 7.00 1,561.66 10,931.59
- M30 Baud mur set 40.00 892.38 35,695.00
- M39 Baud mur set 168.00 892.38 149,919.00
Perpipaan Drain dan Overflow 0 - -
- Ø 400 mm DI Gate Valve resilient seat all flange unit 2.00 215,336.00 430,672.00
- Ø 400 mm Flange las unit 8.00 680,927.50 5,447,420.00
- Ø 400 mm Steel pipa SCH.40 m' 18.00 22,988.58 413,794.46
- Ø 300 mm pipa PVC untuk penguras m' 142.00 43,753.26 6,212,963.47
- Ø 400 mm x 90 Steel Bend fl - fl unit 4.00 101,640.00 406,560.00
- Ø 400 mm x 1000 mm' Double Flange ( Wall Pipe ) unit 4.00 139,975.00 559,900.00
- Ø 400 mm CI Bell mouth unit 2.00 94,611.00 189,222.00
- M27 Baud mur set 64.00 892.38 57,112.00
- M24 Baud mur set 132.00 892.38 117,793.50
- Bak Kontrol Pipa Penguras unit 1.00 12,375,004.40 12,375,004.40
- Ø 300 mm x 750 mm double Flange ( wall pipe ) unit 2.00 129,910.00 259,820.00
- A.F. Gate Valve PN 10 Ø 300 mm unit 2.00 215,077.50 430,155.00
- Bend all flange 90° , Baja 300 mm, unit 2.00 136,620.00 273,240.00
- Ø 300 mm x Ø 300 mm Steel Tee fl - fl unit 1.00 129,827.50 129,827.50
- Ø 300 mm Steel Pipa Sch. 40 unit 38.50 196,303.35 7,557,678.94
- Ø 300 mm Flange las unit 6.00 521,723.13 3,130,338.75
- Ø 300 mm Karet Packing unit 11.00 1,561.66 17,178.22
- Ø 400 mm pipa PVC untuk penguras unit 90.00 121,680.63 10,951,256.25
- Ø 300 mm pipa PVC untuk penguras unit 150.57 121,680.63 18,321,451.71
- Ø 400 mm Karet Packing unit 4.00 1,561.66 6,246.63
Jumlah 137,385,867.15
c Pengadaan Elektrikal dan Accesories 0 -
Panel Penerangan Pos Jaga (PP-PJ) 0 -
- Box Plastic mini pragma pintu tranparant, inbow, 12 modul Unit 1.00 186,780.00 186,780.00
- MCB 3P/16A 10 KA unit 1.00 190,129.50 190,129.50
- RCCB/ELCB, 4P, 25A, Sensitifitas : 30 mA unit 1.00 568,551.50 568,551.50
- MCB 1P/6A 6 KA unit 4.00 40,414.00 161,656.00
- MCB 1P/10A 6 KA unit 1.00 40,414.00 40,414.00
- Box plastic mini pragma pintu transparant, inbow, 12 modul unit 1.00 308,000.00 308,000.00
- MCB 1P/16A 6 KA unit 1.00 200,200.00 200,200.00
- RCCB/ELCB, 2P, 16A, Sensitifitas : 30 mA unit 1.00 1,074,150.00 1,074,150.00
- MCB 1P/4A 6 KA unit 6.00 161,700.00 970,200.00
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 807,660.48 807,660.48
Penerangan Ruang Pos Jaga 0 - -
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 396,000.00 396,000.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 528,000.00 528,000.00
- Single switch 10 A/ 220V plano unit 6.00 18,700.00 112,200.00
- Double Switch 10 A/ 220V plano unit 2.00 23,100.00 46,200.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 4.00 253,605.40 1,014,421.58
- Kabel NYM 3 x 2,5 mm2 m 80.00 14,300.00 1,144,000.00
- uPVC Conduit 20 m m 70.00 8,635.00 604,450.00
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
- Lampu TL 2 X 18W/WP unit 9.00 65,450.00 589,050.00
- Lampu Taman unit - 366,520.00 -
- Lampu jalan 50 W /SINGEL unit 12.00 513,128.00 6,157,536.00
- Outlet 10 A/2P+E 220V unit 6.00 170,940.00 1,025,640.00
- Single switch 10 A/ 220V plano unit 6.00 18,700.00 112,200.00
- Kabel dari P. Penerangan ke PJU - -
- - NYFGBY 3 x 2,5 mm2 meter 280.00 43,274.00 12,116,720.00
- Kabel dari P. Penerangan ke Lampu Taman - -
- - NYFGBY 3 x 2,5 mm2 meter 130.00 43,274.00 5,625,620.00
- Kabel dari P. Penerangan ke lampu stop kontak Penguras - -
- - NYFGBY 3 x 2,5 mm2 meter 90.00 43,274.00 3,894,660.00
- Junction Box untuk kabel NYFGBY ke NYM unit 1.00 1,099,560.00 1,099,560.00
- Instalasi titik lampu titik 15.00 589,050.00 8,835,750.00
- Instalasi titik lampu jalan titik 12.00 589,050.00 7,068,600.00
- Instalasi titik lampu taman titik - 654,500.00 -
- Instalasi stop kontak titik 6.00 392,700.00 2,356,200.00
Jumlah 57,269,749.06
d Pemasangan Elektrikal dan Accesories 0 -
Panel Penerangan Pos Jaga (PP-PJ) 0 -
- Perakitan dan Pemasangan lengkap termasuk aksesoris set 1.00 807,660.48 807,660.48
Penerangan Ruang Pos Jaga 0 - -
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 4.00 24,200.00 96,800.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 24,200.00 -
- Titik Lampu titik 2.00 72,689.44 145,378.88
Penyambungan Listrik PLN 0 -
- Uang Jaminan Pelanggan VA 4,400.00 272.25 1,197,900.00
- Biaya penyambungan VA 4,400.00 555.50 2,444,200.00
- Biaya installatir termasuk Sertifikasi Laik Operasi VA 4,400.00 145.20 638,880.00
- Biaya konstruksi dan peralatan penunjang LS 1.00 226,671,423.94 226,671,423.94
Jumlah 232,082,983.30
- -
e Pengadaan Elektrikal dan Accesories -
Panel Penerangan Pos Jaga (PP-PJ) -
- Box Plastic mini pragma pintu tranparant, inbow, 12 modul Unit 1.00 186,780.00 186,780.00
- MCB 3P/16A 10 KA unit 1.00 190,129.50 190,129.50
- RCCB/ELCB, 4P, 25A, Sensitifitas : 30 mA unit 1.00 568,551.50 568,551.50
- MCB 1P/6A 6 KA unit 4.00 40,414.00 161,656.00
- MCB 1P/10A 6 KA unit 1.00 40,414.00 40,414.00
Penerangan Toilet - -
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 396,000.00 396,000.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 528,000.00 528,000.00
- Single switch 10 A/ 220V plano unit 8.00 18,700.00 149,600.00
- Double Switch 10 A/ 220V plano unit 2.00 23,100.00 46,200.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 6.00 253,605.40 1,521,632.38
- Kabel NYM 3 x 2,5 mm2 m 200.00 14,300.00 2,860,000.00
- uPVC Conduit 20 m m 75.00 8,635.00 647,625.00
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
Penerangan Ruang Pos Jaga - -
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 396,000.00 396,000.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 528,000.00 528,000.00
- Single switch 10 A/ 220V plano unit 6.00 18,700.00 112,200.00
- Double Switch 10 A/ 220V plano unit 2.00 23,100.00 46,200.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 4.00 253,605.40 1,014,421.58
- Kabel NYM 3 x 2,5 mm2 m 80.00 14,300.00 1,144,000.00
- uPVC Conduit 20 m m 70.00 8,635.00 604,450.00
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
- Panel Lokal Valve Sedimentasi 0 - -
- Penangkal Petir type Elctrode dengan Rmin = 60m LS 1.00 10,822,650.43 10,822,650.43
- Grounding Anchor Rot 4 meter (3/4) unit 5.00 770,000.00 3,850,000.00
- - NYA 50 mm2 meter 10.00 150,150.00 1,501,500.00
- Clamp Anchor Rot 50 mm2 unit 2.00 16,940.00 33,880.00
- Air terminal Ø 1, termasuk dudukan, komplit set 1.00 686,511.41 686,511.41
- GIP Ø 3 unit 1.00 1,811,040.00 1,811,040.00
- GIP Ø 2 unit 1.00 123,200.00 123,200.00
- Box control 30x30x70 cm unit 1.00 848,043.50 848,043.50
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 807,660.48 807,660.48
Jumlah 31,696,745.78
-
f Pemasangan Elektrikal dan Accesories -
Panel Penerangan Pos Jaga (PP-PJ) -
- Perakitan dan Pemasangan lengkap termasuk aksesoris set 1.00 807,660.48 807,660.48
- Penerangan Toilet - -
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 6.00 24,200.00 145,200.00
- Titik Lampu titik 2.00 72,689.44 145,378.88
Penerangan Ruang Pos Jaga - -
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 4.00 24,200.00 96,800.00
- Titik Lampu titik 2.00 72,689.44 145,378.88
Jumlah 1,501,898.24
g Pengadaan Lampu penerangan luar -
Dari panel PP-LR1 -
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 2,464,000.00 41,888,000.00
- Tiang lampu hot dip galvanis 6 m set 17.00 2,200,000.00 37,400,000.00
- Kabel NYFGbY 3 x 4 mm2 m 15.00 26,950.00 404,250.00
- Kabel NYFGbY 3 x 2,5 mm2 m 185.00 18,700.00 3,459,500.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Kabel NYFGbY 2 x 2,5 mm2 m 100.00 15,950.00 1,595,000.00
- GIP 2" m 6.00 123,200.00 739,200.00
Dari panel PP-LR2 - -
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 2,464,000.00 41,888,000.00
- Tiang lampu hot dip galvanis 6 m set 17.00 2,200,000.00 37,400,000.00
- Kabel NYFGbY 4 x 4 mm2 m 30.00 31,900.00 957,000.00
- Kabel NYFGbY 3 x 4 mm2 m 50.00 26,950.00 1,347,500.00
- Kabel NYFGbY 3 x 2,5 mm2 m 50.00 18,700.00 935,000.00
- Kabel NYFGbY 4 x 2,5 mm2 m 60.00 22,000.00 1,320,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 40.00 15,950.00 638,000.00
Dari panel PP-LR3 - -
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 2,464,000.00 41,888,000.00
- Kabel NYFGbY 3 x 2,5 mm2 m 150.00 18,700.00 2,805,000.00
- Kabel NYFGbY 4 x 4 mm2 m 50.00 31,900.00 1,595,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 220.00 15,950.00 3,509,000.00
- 5. GIP 2" m 6.00 123,200.00 739,200.00
- Tiang lampu hot dip galvanis 6 m set 8.00 2,200,000.00 17,600,000.00
Jumlah 238,107,650.00
h Pemasangan Lampu penerangan luar -
Dari panel PP-LR1 -
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 807,660.48 13,730,228.16
- Kabel NYFGbY 3 x 4 mm2 m 15.00 30,800.00 462,000.00
- Kabel NYFGbY 3 x 2,5 mm2 m 185.00 30,800.00 5,698,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 100.00 30,800.00 3,080,000.00
Dari panel PP-LR2 - -
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 807,660.48 13,730,228.16
- Kabel NYFGbY 4 x 4 mm2 m 30.00 30,800.00 924,000.00
- Kabel NYFGbY 3 x 4 mm2 m 50.00 30,800.00 1,540,000.00
- Kabel NYFGbY 3 x 2,5 mm2 m 50.00 30,800.00 1,540,000.00
- Kabel NYFGbY 4 x 2,5 mm2 m 60.00 30,800.00 1,848,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 40.00 30,800.00 1,232,000.00
Dari panel PP-LR3 - -
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 807,660.48 13,730,228.16
- Kabel NYFGbY 3 x 2,5 mm2 m 150.00 30,800.00 4,620,000.00
- Kabel NYFGbY 4 x 4 mm2 m 50.00 30,800.00 1,540,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 220.00 30,800.00 6,776,000.00
Jumlah 70,450,684.48

BANGUNAN RESERVOIR ULARAN Err:509


Err:509
A BANGUNAN RESERVOIR KAPASITAS 150 M3
1 PEKERJAAN TANAH
1 Pengukuran dan Pasang Bowplank m' 59.80 - -
2 Galian Tanah dengan excavator m3 267.32 - -
3 Urugan Tanah Kembali dengan Pemadatan m3 57.20 - -
4 Urugan Pasir t = 10 cm m3 12.87 - -
Jumlah -
2 PEKERJAAN STRUKTUR ATAU SIPIL DAN ASITEKTUR
a Pekerjaan Beton
2 Lantai Kerja K - 125 (1 PC : 3 PS : 5KR)
- Cor Beton Camp 1:3:5 m3 12.87 - -
4 Pekerjaan Sloof
- Beton Cor K-300 m3 4.99 - -
- Pekerjaan Besi Beton Kg 1,314.52 - -
- Begesting Pasangan Batako m2 44.58 - -
5 Pekerjaan Beton Lantai
- Beton Cor K-300 m3 52.31 - -
- besi Beton Kg 4,742.48 - -
6 Pekerjaan Beton Kolom
- Beton Cor K-300 m3 5.24 - -
- besi Beton Kg 1,328.09 - -
- Begesting 2 X pakai m2 91.08 - -
7 Pekerjaan Beton Dinding
- Beton Cor K-300 m3 41.71 - -
- besi Beton Kg 4,921.20 - -
- Begesting 2 X pakai m2 417.08 - -
- Pekerjaan Tie Rod pada Bekisting Vertikal m1 326.00 - -
9 Pekerjaan Beton Balok
- Beton Cor K-300 m3 4.79 - -
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- besi Beton Kg 1,278.26 - -
- Begesting 2 X pakai m2 67.10 - -
###Pekerjaan Beton Plat Atap
- Beton Cor K-300 m3 12.67 - -
- besi Beton Kg 2,332.47 - -
- Begesting m2 126.66 - -
Jumlah -

b Pekerjaan Pasangan dan Pelapis


###Pekerjaan Pas, Dinding Bata Merah m2 53.90 - -
###Pekerjaan Water Proofing m2 652.23 - -
###Pekerjaan Water Stop m 191.70 - -
###Pekerjaan Plesteran 1 PC : 2 Ps m2 685.73 - -
###Pekerjaan Acian m2 33.51 - -
Jumlah -
c Pekerjaan Kusen Pintu dan Relling
###Pekerjaan Pipa Ventilasi GIP 4" Unit 4.00 750,000.00 3,000,000.00
###Pekerjaan Penutup Man Hole Plat Besi T= 1.2 mm Unit 5.00 Err:509 Err:509
###Pekerjaan Tangga Inspeksi Pipa GIP Unit 4.00 Err:509 Err:509
Pekerjaan Tangga Besi Kg 194.60 - -
Jumlah Err:509
3 PEKERJAAN PIPA DAN ACCESSORIES
Pengadaan
Pipa In Flow Pipa Baja Three layer Polythylene dia.ID 150 mm, m 53.10 Err:509 Err:509
Pipa Over Flow dan Penguras Pipa Baja Three layer Polythylene dia. ID 15 m 57.83 Err:509 Err:509
Pipa Out Flow Pipa Baja Three layer Polythylene dia.ID 150 mm m 55.02 Err:509 Err:509
Bend 90° Three Layer Polythelene dia ID 150 mm bh 7.00 Err:509 Err:509
Tee ID 150X150 bh 1.00 Err:509 Err:509
Strainer Y ID Ø 150 bh 1.00 Err:509 Err:509
AF Gate Valve PN 16 dia. 6'' bh 3.00 - -
Dismantling Joint dia. 6'' bh 3.00 Err:509 Err:509
Watermeter dia. 6'' bh 1.00 Err:509 Err:509
End Cap dia. 6'' bh 1.00 - -
Saringan dia. 6'' bh 1.00 3,500,000.00 3,500,000.00
Pemasangan
Pipa In Flow Pipa Baja Three layer Polythylene dia.ID 150 mm, m 53.10 - -
Pipa Over Flow dan Penguras Pipa Baja Three layer Polythylene dia. ID 15 m 57.83 - -
Pipa Out Flow Pipa Baja Three layer Polythylene dia.ID 150 mm m 55.02 - -
Bend 90° Three Layer Polythelene dia ID 150 mm bh 7.00 60,000.00 420,000.00
Tee ID 150X150 bh 1.00 60,000.00 60,000.00
Strainer Y ID Ø 150 bh 1.00 60,000.00 60,000.00
AF Gate Valve PN 16 dia. 6'' bh 3.00 60,000.00 180,000.00
Dismantling Joint dia. 6'' bh 3.00 60,000.00 180,000.00
Watermeter dia. 6'' bh 1.00 60,000.00 60,000.00
End Cap dia. 14'' bh 1.00 60,000.00 60,000.00
Saringan dia. 6'' bh 1.00 60,000.00 60,000.00
Jumlah Err:509

-
D PAGAR
Pengukuran dan Pasang Bowplank m' 22.23 - -
Galian Tanah dengan excavator m3 5.67 - -
Urugan Tanah Kembali dengan Pemadatan m3 5.87 - -
Urugan Pasir t = 10 cm m3 0.33 - -
Pekerjaan Pasangan Batu Kosong m3 1.00 - -
Pekerjaan Pasangan Batu Kali Camp 1 : 5 m3 3.67 - -
Pekerjaan Sloof
- Beton Cor K-300 m3 1.11 - -
- Pekerjaan Besi Beton Kg 123.42 - -
- Begesting 2 X pakai m2 11.13 - -
Pekerjaan Beton Kolom
- Beton Cor K-300 m3 1.11 - -
- besi Beton Kg 123.42 - -
- Begesting 2 X pakai m2 11.13 - -
Pekerjaan Beton Balok
- Beton Cor K-300 m3 0.32 - -
- besi Beton Kg 56.45 - -
- Begesting 2 X pakai m2 8.55 - -
###Pekerjaan Pasangan Bata Camp 1:5 m2 31.12 - -
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
###Pekerjaan Plesteran 1 PC : 5 PS m2 103.35 - -
###Pekerjaan Acian m2 103.35 - -
Pekerjaan Paving t=8 mm, K225 m2 114.00 - -
Jumlah -
2,592,043,291.02
D PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
a Pengadaan mekanikal dan aksesoris
Perpipaan Inlet
- Ø 700 mm x Ø 400 mm Steel Tee all flange unit 2.00 19,764,888.00 39,529,776.00
- Ø 700 mm Blank Flange unit 1.00 14,391,520.00 14,391,520.00
- Ø 700 mm Dismantling Joint/Adaptor unit 1.00 6,945,523.20 6,945,523.20
- Ø 700 mm Stell pipe SCH.40 m 18.00 5,626,698.00 101,280,564.00
- Ø 400 mm Butterfly Valve resilient seat all flange unit 2.00 66,813,120.00 133,626,240.00
- Ø 400 mm Flange las unit 4.00 748,000.00 2,992,000.00
- Ø 400 mm x 90 Steel Bend all flange unit 4.00 4,951,964.16 19,807,856.64
- Ø 400 mm x 1000 m' Double Flange ( Wall Pipe ) unit 2.00 7,814,400.00 15,628,800.00
- Ø 700 mm Karet Packing unit 5.00 56,100.00 280,500.00
- Ø 700 mm Karet Packing unit 1.00 56,100.00 56,100.00
- Ø 400 mm Karet Packing unit 10.00 35,816.00 358,160.00
- 1" x 5" Baud Mur set 120.00 29,700.00 3,564,000.00
- Ø 500 mm x 0,75 m' Pipa Inlet ( Wall Pipe ) Unit 2.00 10,348,800.00 20,697,600.00
- Ø 700 mm Flange las Unit 6.00 12,457,368.00 74,744,208.00
- Ø 500 mm Karet Packing Unit 2.00 42,988.00 85,976.00
- Ø 500 mm DI Gate Valve resilient seat lengkap dengan Floo Unit 2.00 105,494,400.00 210,988,800.00
- M30 Baud mur set 40.00 51,036.70 2,041,468.00
- M39 Baud mur set 144.00 56,320.00 8,110,080.00
Pengadaan dan Pemasangan Extended Stem Valve set 2,383,562.50 -
Perpipaan Outlet 0 -
- Ø 700 mm x 0,60 m' Woll pipe fl - sp unit 1.00 10,428,000.00 10,428,000.00
- Ø 700 mm Steel pipe SCH.40 m' 10.00 5,626,698.00 56,266,980.00
- Ø 700 mm DI Gate Valve metal resilient Seated all flange unit 2.00 133,626,240.00 267,252,480.00
- Ø 700 mm x Ø 500 mm Stell Tee fl -fl unit 1.00 20,322,588.00 20,322,588.00
- Ø 700 mm x Ø 500 mm Steel Reducer unit 1.00 9,529,977.60 9,529,977.60
- Ø 700 mm x 90 Steel Bend fl - fl unit 2.00 16,060,000.00 32,120,000.00
- Box Kontrol Uk. 2,4x 1,5 x 1,5 m' unit 3.00 14,437,500.00 43,312,500.00
- Ø 700 mm Flange las unit 7.00 12,457,368.00 87,201,576.00
- Ø 500 mm Flange las unit 2.00 4,311,014.40 8,622,028.80
- Ø 500 mm Karet Packing unit 2.00 42,988.00 85,976.00
- Ø 700 mm Karet Packing unit 7.00 56,100.00 392,700.00
- M30 Baud mur set 40.00 51,036.70 2,041,468.00
- M39 Baud mur set 168.00 56,320.00 9,461,760.00
- Ø 300 mm Penguras PVC m' 150.57 1,175,625.00 177,013,856.25
Perpipaan Drain dan Overflow 0 -
- Ø 400 mm DI Gate Valve resilient seat all flange unit - 59,780,160.00 -
- Ø 400 mm Flange las unit 4.00 748,000.00 2,992,000.00
- Ø 400 mm Steel pipa SCH.40 m' 6.00 5,461,532.98 32,769,197.87
- Ø 300 mm pipa PVC untuk penguras m' 142.00 308,000.00 43,736,000.00
- Ø 400 mm x 90 Steel Bend fl - fl unit 2.00 4,951,964.16 9,903,928.32
- Ø 400 mm x 1000 mm' Double Flange ( Wall Pipe ) unit 2.00 7,814,400.00 15,628,800.00
- Ø 400 mm Karet Packing unit 4.00 35,816.00 143,264.00
- Ø 400 mm CI Bell mouth unit 2.00 2,566,080.00 5,132,160.00
- 1" x 5" Baud Mur set 336.00 29,700.00 9,979,200.00
- M27 Baud mur set 64.00 48,605.70 3,110,764.80
- M24 Baud mur set 132.00 44,187.00 5,832,684.00
- Bak Kontrol Pipa Penguras unit 1.00 14,437,500.00 14,437,500.00
- Ø 300 mm x 750 mm double Flange ( wall pipe ) unit 2.00 2,354,880.00 4,709,760.00
- A.F. Gate Valve PN 10 Ø 300 mm unit 2.00 14,300,000.00 28,600,000.00
- Bend all flange 90° , Baja 300 mm, unit 2.00 1,872,200.00 3,744,400.00
- Ø 300 mm x Ø 300 mm Steel Tee fl - fl unit 1.00 3,843,840.00 3,843,840.00
- Ø 300 mm Steel Pipa Sch. 40 unit 38.50 2,598,676.66 100,049,051.53
- Ø 300 mm Flange las unit 6.00 880,000.00 5,280,000.00
- Ø 300 mm Karet Packing unit 11.00 36,850.00 405,350.00
- Ø 400 mm pipa PVC untuk penguras m 90.00 1,711,875.00 154,068,750.00
Jumlah 1,823,547,713.00
- -
b Pemasangan mekanikal dan aksesoris 0 -
Perpipaan Inlet 0 -
- Ø 700 mm x Ø 400 mm Steel Tee all flange unit 2.00 226,336.00 452,672.00
- Ø 700 mm Blank Flange unit 1.00 1,166,411.13 1,166,411.13
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Ø 700 mm Dismantling Joint/Adaptor unit 1.00 104,489.00 104,489.00
- Ø 700 mm Stell pipe SCH.40 m 14.50 386,455.10 5,603,598.98
- Ø 400 mm Butterfly Valve resilient seat all flange unit 2.00 215,336.00 430,672.00
- Ø 400 mm Flange las unit 4.00 680,927.50 2,723,710.00
- Ø 400 mm x 90 Steel Bend all flange unit 4.00 101,640.00 406,560.00
- Ø 400 mm x 1000 m' Double Flange ( Wall Pipe ) unit 2.00 139,975.00 279,950.00
- Ø 500 mm x 0,75 m' Pipa Inlet ( Wall Pipe ) Unit 2.00 139,975.00 279,950.00
- Ø 700 mm Flange las Unit 6.00 1,166,411.13 6,998,466.75
- Ø 500 mm Karet Packing Unit 2.00 1,561.66 3,123.31
- Ø 500 mm DI Gate Valve resilient seat lengkap dengan Floo Unit 2.00 246,664.00 493,328.00
- M30 Baud mur set 40.00 892.38 35,695.00
- M39 Baud mur set 144.00 892.38 128,502.00
- Ø 700 mm Karet Packing set 6.00 1,561.66 9,369.94
Perpipaan Outlet 0 - -
- Ø 700 mm x 0,60 m' Woll pipe fl - sp unit 2.00 139,975.00 279,950.00
- Ø 700 mm Steel pipe SCH.40 m' 6.00 386,455.10 2,318,730.61
- Ø 700 mm DI Gate Valve metal resilient Seated all flange unit 2.00 283,041.00 566,082.00
- Ø 700 mm x Ø 500 mm Stell Tee fl -fl unit 1.00 226,336.00 226,336.00
- Ø 700 mm x Ø 500 mm Steel Reducer unit 1.00 136,620.00 136,620.00
- Ø 700 mm x 90 Steel Bend fl - fl unit 2.00 136,620.00 273,240.00
- Box Kontrol Uk. 2,4x 1,5 x 1,5 m' unit 3.00 12,375,004.40 37,125,013.20
- Ø 700 mm Flange las unit 7.00 1,166,411.13 8,164,877.88
- Ø 500 mm Flange las unit 2.00 845,607.82 1,691,215.64
- Ø 500 mm Karet Packing unit 2.00 1,561.66 3,123.31
- Ø 700 mm Karet Packing unit 7.00 1,561.66 10,931.59
- M30 Baud mur set 40.00 892.38 35,695.00
- M39 Baud mur set 168.00 892.38 149,919.00
Perpipaan Drain dan Overflow 0 - -
- Ø 400 mm DI Gate Valve resilient seat all flange unit 2.00 215,336.00 430,672.00
- Ø 400 mm Flange las unit 8.00 680,927.50 5,447,420.00
- Ø 400 mm Steel pipa SCH.40 m' 18.00 22,988.58 413,794.46
- Ø 300 mm pipa PVC untuk penguras m' 142.00 43,753.26 6,212,963.47
- Ø 400 mm x 90 Steel Bend fl - fl unit 4.00 101,640.00 406,560.00
- Ø 400 mm x 1000 mm' Double Flange ( Wall Pipe ) unit 4.00 139,975.00 559,900.00
- Ø 400 mm CI Bell mouth unit 2.00 94,611.00 189,222.00
- M27 Baud mur set 64.00 892.38 57,112.00
- M24 Baud mur set 132.00 892.38 117,793.50
- Bak Kontrol Pipa Penguras unit 1.00 12,375,004.40 12,375,004.40
- Ø 300 mm x 750 mm double Flange ( wall pipe ) unit 2.00 129,910.00 259,820.00
- A.F. Gate Valve PN 10 Ø 300 mm unit 2.00 215,077.50 430,155.00
- Bend all flange 90° , Baja 300 mm, unit 2.00 136,620.00 273,240.00
- Ø 300 mm x Ø 300 mm Steel Tee fl - fl unit 1.00 129,827.50 129,827.50
- Ø 300 mm Steel Pipa Sch. 40 unit 38.50 196,303.35 7,557,678.94
- Ø 300 mm Flange las unit 6.00 521,723.13 3,130,338.75
- Ø 300 mm Karet Packing unit 11.00 1,561.66 17,178.22
- Ø 400 mm pipa PVC untuk penguras unit 90.00 121,680.63 10,951,256.25
- Ø 300 mm pipa PVC untuk penguras unit 150.57 121,680.63 18,321,451.71
- Ø 400 mm Karet Packing unit 4.00 1,561.66 6,246.63
Jumlah 137,385,867.15
c Pengadaan Elektrikal dan Accesories 0 -
Panel Penerangan Pos Jaga (PP-PJ) 0 -
- Box Plastic mini pragma pintu tranparant, inbow, 12 modul Unit 1.00 186,780.00 186,780.00
- MCB 3P/16A 10 KA unit 1.00 190,129.50 190,129.50
- RCCB/ELCB, 4P, 25A, Sensitifitas : 30 mA unit 1.00 568,551.50 568,551.50
- MCB 1P/6A 6 KA unit 4.00 40,414.00 161,656.00
- MCB 1P/10A 6 KA unit 1.00 40,414.00 40,414.00
- Box plastic mini pragma pintu transparant, inbow, 12 modul unit 1.00 308,000.00 308,000.00
- MCB 1P/16A 6 KA unit 1.00 200,200.00 200,200.00
- RCCB/ELCB, 2P, 16A, Sensitifitas : 30 mA unit 1.00 1,074,150.00 1,074,150.00
- MCB 1P/4A 6 KA unit 6.00 161,700.00 970,200.00
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 807,660.48 807,660.48
Penerangan Ruang Pos Jaga 0 - -
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 396,000.00 396,000.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 528,000.00 528,000.00
- Single switch 10 A/ 220V plano unit 6.00 18,700.00 112,200.00
- Double Switch 10 A/ 220V plano unit 2.00 23,100.00 46,200.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 4.00 253,605.40 1,014,421.58
- Kabel NYM 3 x 2,5 mm2 m 80.00 14,300.00 1,144,000.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- uPVC Conduit 20 m m 70.00 8,635.00 604,450.00
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
- Lampu TL 2 X 18W/WP unit 9.00 65,450.00 589,050.00
- Lampu Taman unit - 366,520.00 -
- Lampu jalan 50 W /SINGEL unit 12.00 513,128.00 6,157,536.00
- Outlet 10 A/2P+E 220V unit 6.00 170,940.00 1,025,640.00
- Single switch 10 A/ 220V plano unit 6.00 18,700.00 112,200.00
- Kabel dari P. Penerangan ke PJU - -
- - NYFGBY 3 x 2,5 mm2 meter 280.00 43,274.00 12,116,720.00
- Kabel dari P. Penerangan ke Lampu Taman - -
- - NYFGBY 3 x 2,5 mm2 meter 130.00 43,274.00 5,625,620.00
- Kabel dari P. Penerangan ke lampu stop kontak Penguras - -
- - NYFGBY 3 x 2,5 mm2 meter 90.00 43,274.00 3,894,660.00
- Junction Box untuk kabel NYFGBY ke NYM unit 1.00 1,099,560.00 1,099,560.00
- Instalasi titik lampu titik 15.00 589,050.00 8,835,750.00
- Instalasi titik lampu jalan titik 12.00 589,050.00 7,068,600.00
- Instalasi titik lampu taman titik - 654,500.00 -
- Instalasi stop kontak titik 6.00 392,700.00 2,356,200.00
Jumlah 57,269,749.06
d Pemasangan Elektrikal dan Accesories 0 -
Panel Penerangan Pos Jaga (PP-PJ) 0 -
- Perakitan dan Pemasangan lengkap termasuk aksesoris set 1.00 807,660.48 807,660.48
Penerangan Ruang Pos Jaga 0 - -
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 4.00 24,200.00 96,800.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 24,200.00 -
- Titik Lampu titik 2.00 72,689.44 145,378.88
Penyambungan Listrik PLN 0 -
- Uang Jaminan Pelanggan VA 4,400.00 272.25 1,197,900.00
- Biaya penyambungan VA 4,400.00 555.50 2,444,200.00
- Biaya installatir termasuk Sertifikasi Laik Operasi VA 4,400.00 145.20 638,880.00
- Biaya konstruksi dan peralatan penunjang LS 1.00 226,671,423.94 226,671,423.94
Jumlah 232,082,983.30
- -
e Pengadaan Elektrikal dan Accesories -
Panel Penerangan Pos Jaga (PP-PJ) -
- Box Plastic mini pragma pintu tranparant, inbow, 12 modul Unit 1.00 186,780.00 186,780.00
- MCB 3P/16A 10 KA unit 1.00 190,129.50 190,129.50
- RCCB/ELCB, 4P, 25A, Sensitifitas : 30 mA unit 1.00 568,551.50 568,551.50
- MCB 1P/6A 6 KA unit 4.00 40,414.00 161,656.00
- MCB 1P/10A 6 KA unit 1.00 40,414.00 40,414.00
Penerangan Toilet - -
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 396,000.00 396,000.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 528,000.00 528,000.00
- Single switch 10 A/ 220V plano unit 8.00 18,700.00 149,600.00
- Double Switch 10 A/ 220V plano unit 2.00 23,100.00 46,200.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 6.00 253,605.40 1,521,632.38
- Kabel NYM 3 x 2,5 mm2 m 200.00 14,300.00 2,860,000.00
- uPVC Conduit 20 m m 75.00 8,635.00 647,625.00
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
Penerangan Ruang Pos Jaga - -
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 396,000.00 396,000.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 528,000.00 528,000.00
- Single switch 10 A/ 220V plano unit 6.00 18,700.00 112,200.00
- Double Switch 10 A/ 220V plano unit 2.00 23,100.00 46,200.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 4.00 253,605.40 1,014,421.58
- Kabel NYM 3 x 2,5 mm2 m 80.00 14,300.00 1,144,000.00
- uPVC Conduit 20 m m 70.00 8,635.00 604,450.00
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
- Panel Lokal Valve Sedimentasi 0 - -
- Penangkal Petir type Elctrode dengan Rmin = 60m LS 1.00 10,822,650.43 10,822,650.43
- Grounding Anchor Rot 4 meter (3/4) unit 5.00 770,000.00 3,850,000.00
- - NYA 50 mm2 meter 10.00 150,150.00 1,501,500.00
- Clamp Anchor Rot 50 mm2 unit 2.00 16,940.00 33,880.00
- Air terminal Ø 1, termasuk dudukan, komplit set 1.00 686,511.41 686,511.41
- GIP Ø 3 unit 1.00 1,811,040.00 1,811,040.00
- GIP Ø 2 unit 1.00 123,200.00 123,200.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Box control 30x30x70 cm unit 1.00 848,043.50 848,043.50
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 807,660.48 807,660.48
Jumlah 31,696,745.78
-
f Pemasangan Elektrikal dan Accesories -
Panel Penerangan Pos Jaga (PP-PJ) -
- Perakitan dan Pemasangan lengkap termasuk aksesoris set 1.00 807,660.48 807,660.48
- Penerangan Toilet - -
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 6.00 24,200.00 145,200.00
- Titik Lampu titik 2.00 72,689.44 145,378.88
Penerangan Ruang Pos Jaga - -
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 4.00 24,200.00 96,800.00
- Titik Lampu titik 2.00 72,689.44 145,378.88
Jumlah 1,501,898.24
g Pengadaan Lampu penerangan luar -
Dari panel PP-LR1 -
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 2,464,000.00 41,888,000.00
- Tiang lampu hot dip galvanis 6 m set 17.00 2,200,000.00 37,400,000.00
- Kabel NYFGbY 3 x 4 mm2 m 15.00 26,950.00 404,250.00
- Kabel NYFGbY 3 x 2,5 mm2 m 185.00 18,700.00 3,459,500.00
- Kabel NYFGbY 2 x 2,5 mm2 m 100.00 15,950.00 1,595,000.00
- GIP 2" m 6.00 123,200.00 739,200.00
Dari panel PP-LR2 - -
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 2,464,000.00 41,888,000.00
- Tiang lampu hot dip galvanis 6 m set 17.00 2,200,000.00 37,400,000.00
- Kabel NYFGbY 4 x 4 mm2 m 30.00 31,900.00 957,000.00
- Kabel NYFGbY 3 x 4 mm2 m 50.00 26,950.00 1,347,500.00
- Kabel NYFGbY 3 x 2,5 mm2 m 50.00 18,700.00 935,000.00
- Kabel NYFGbY 4 x 2,5 mm2 m 60.00 22,000.00 1,320,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 40.00 15,950.00 638,000.00
Dari panel PP-LR3 - -
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 2,464,000.00 41,888,000.00
- Kabel NYFGbY 3 x 2,5 mm2 m 150.00 18,700.00 2,805,000.00
- Kabel NYFGbY 4 x 4 mm2 m 50.00 31,900.00 1,595,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 220.00 15,950.00 3,509,000.00
- 5. GIP 2" m 6.00 123,200.00 739,200.00
- Tiang lampu hot dip galvanis 6 m set 8.00 2,200,000.00 17,600,000.00
Jumlah 238,107,650.00
h Pemasangan Lampu penerangan luar -
Dari panel PP-LR1 -
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 807,660.48 13,730,228.16
- Kabel NYFGbY 3 x 4 mm2 m 15.00 30,800.00 462,000.00
- Kabel NYFGbY 3 x 2,5 mm2 m 185.00 30,800.00 5,698,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 100.00 30,800.00 3,080,000.00
Dari panel PP-LR2 - -
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 807,660.48 13,730,228.16
- Kabel NYFGbY 4 x 4 mm2 m 30.00 30,800.00 924,000.00
- Kabel NYFGbY 3 x 4 mm2 m 50.00 30,800.00 1,540,000.00
- Kabel NYFGbY 3 x 2,5 mm2 m 50.00 30,800.00 1,540,000.00
- Kabel NYFGbY 4 x 2,5 mm2 m 60.00 30,800.00 1,848,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 40.00 30,800.00 1,232,000.00
Dari panel PP-LR3 - -
- Lampu LED 56W with aluminium housing, termasuk MCB dan set 17.00 807,660.48 13,730,228.16
- Kabel NYFGbY 3 x 2,5 mm2 m 150.00 30,800.00 4,620,000.00
- Kabel NYFGbY 4 x 4 mm2 m 50.00 30,800.00 1,540,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 220.00 30,800.00 6,776,000.00
Jumlah 70,450,684.48
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6

II PEKERJAAN BANGUNAN SIPIL ###


A PEKERJAAN BANGUNAN BAK INTAKE DAN RUMAH POMPA #REF!
1 PEKERJAAN TANAH ###
1 Pengukuran dan Pasang Bowplank m' 144.20 - -
2 Galian Tanah dengan Excavator m3 1,633.84 - -
3 Urugan Tanah Kembali dengan Pemadatan m3 1.21 - -
4 Urugan Pasir m3 107.38 - -
Jumlah -
2 PEKERJAAN STRUKTUR ATAU SIPIL DAN ASITEKTUR
a Pekerjaan Beton
1 Lantai Kerja K 125 ( 1 pc : 3 ps : 5 Kr) m3 53.69 - -
2 Pondasi Beton Plat Kaki dan Plat Keliling Beton Cor K-300
- Beton K 300 m3 56.78 - -
- Pembesian kg 17,731.36 - -
- Begesting Batako m2 142.25 - -
3 Balok Dasar Sloof Begesting Pasangan Batako 1:5
- Beton K 300 m3 135.21 - -
- Pembesian kg 15,008.74 - -
- Begesting 2x Pakai m2 901.42 - -
4 Beton Kolom Pekerjaan Besi Beton
- Beton K 300 m3 51.15 - -
- Pembesian kg 10,665.38 - -
- Begesting 2x Pakai m2 490.86 - -
6 Beton Balok
- Beton K 300 m3 95.05 - -
- Pembesian kg 17,436.11 - -
- Begesting 2x Pakai m2 1,032.02 - -
7 Beton Plat Lantai Pekerjaan Besi Beton
- Beton K 300 m3 234.40 - -
- Pembesian kg 57,148.61 - -
8 Beton Plat Atap Pekerjaan Besi Beton
- Beton K 300 m3 121.33 - -
- Pembesian kg 14,238.52 - -
- Begesting 1x Pakai m2 808.88 - -
9 Dinding Pekerjaan Besi Beton
- Beton K 300 m3 269.88 - -
- Pembesian kg 62,075.59 - -
- Begesting 2x Pakai m2 1,799.19 - -
- Pekerjaan Tie Rod pada Bekisting Vertikal m' 1,471.00 - -
- Pekerjaan Water Proofing m2 3,169.55 - -
10 Beton Lisplank Pekerjaan Begesting 2 X pakai
- Beton K 300 m3 7.01 - -
- Pembesian kg 967.23 - -
- Begesting 2x Pakai m2 154.42 - -
11 Beton Tangga Ruang Pompa Pekerjaan Begesting 2 X pakai
- Beton K 300 m3 0.83 - -
- Pembesian kg 143.47 - -
- Begesting 2x Pakai m2 5.18 - -
12 Beton Dudukan Pipa Header Pekerjaan Begesting 2 X pakai
- Beton K 300 m3 6.01 - -
- Pembesian kg 966.70 - -
- Begesting 2x Pakai m2 26.73 - -
13 Beton Dudukan Pompa Centrifugal Pekerjaan Begesting 2 X pakai
- Beton K 300 m3 6.48 - -
- Pembesian kg 862.68 - -
- Begesting 2x Pakai m2 13.44 - -
Jumlah #REF!

b Pekerjaan Pasangan dan Plesteran Beton Cor K-300


1 Pekerjaan Pasangan Batu Kali 1:4 m3 13.99 - -
2 Pekerjaan PasanganDinding Bata 1 PC : 4 Ps m2 592.09 - -
3 Pekerjaan Plesteran Dinding 1 PC : 4 Ps m2 1,221.68 - -
4 Pekerjaan Acian Dinding m2 2,143.65 - -
5 Pekerjaan Water Stop PVC W 300 mm m' 705.00 - -
6 Pek. Pasangan Bata Paras Sangsit m2 121.10 - -
7 Pek. Pasangan Bata Gosok m2 37.24 - -
8 Pekerjaan Beton Sloope, Ring Balk & Kolom Praktis m3 0.18 - -
Jumlah -
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
c Pekerjaan Kusen, Pintu, Jendela dan Relling
1 Pekerjaan Kusen Baja CNP m' 13.800 - -
2 Pekerjaan Kusen Pintu dan Jendela Aluminium m' 41.550 - -
3 Pek. Daun Pintu Panil Kaca Frame Aluminium m2 4.009 - -
4 Pek Daun Jendela Kaca Frame Aluminium m2 4.15 676,325.00 2,806,748.75
5 Pekerjaan daun Pintu Besi Rangka L.50.50.5 m2 10.59 - -
6 Pasang Engsel Pintu baja As 1" pasang 11.00 - -
7 Pasang Kunci Pintu Baja pasang 2.00 - -
8 Pasang Grendel Tanam untuk Pintu baja Set 8.00 - -
9 Pasang Engsel Pintu set 4.00 - -
10 Pasang Handle dan Kunci Pintu set 2.00 - -
11 Pasang penutup manhole plat besi T=1.2 MM set 4.00 Err:509 Err:509
12 Pekerjaan Tangga Inspeksi Pipa GIP unit 4.00 Err:509 Err:509
13 Railling Balkon dan Tangga ( Pipa Black Steel) m1 7.50 Err:509 Err:509
Jumlah Err:509

d Pekerjaan Finishing Beton Cor K-300


1 Pekerjaan pengecatan dinding m2 1,315.29 - -
2 Meni dan Cat Besi m2 5.30 - -
-
B PEKERJAAN BANGUNAN PENGELOLA 41,928,000.00
1 PEKERJAAN TANAH
1 Pengukuran dan Pasang Bowplank m' 61.60 - -
2 Galian Tanah dengan excavator m3 98.43 - -
3 Urugan Tanah Kembali dengan Pemadatan m3 98.43 - -
4 Urugan Tanah Dipadatkan m3 14.85 - -
5 Urugan Pasir di bawah lantai m3 14.71 - -
6 Urugan Pasir di bawah Pondasi t = 10 cm m3 6.03 - -
Jumlah -

2 PEKERJAAN STRUKTUR ATAU SIPIL DAN ASITEKTUR


a Pekerjaan Pasangan dan Beton
1 Pekerjaan Pasangan Batu Kosong m3 18.11 - -
2 Pekerjaan Pasangan Pondasi Batu Kali m3 51.79 - -
3 Pekerjaan Beton Rabat
- Cor Beton K125 m3 9.69 - -
4 Pekerjaan Beton pondasi Plat kaki
- Beton Cor K-225 m3 4.59 - -
- besi Beton Kg 1,042.59 - -
- Begesting Pasangan Batako 1:5 m2 12.00 - -
- Begesting 2 X pakai m2 25.50 - -
5 Pekerjaan Beton Sloope
- Beton Cor K-225 m3 6.68 - -
- besi Beton Kg 695.33 - -
- Begesting 2 X pakai m2 55.40 - -
6 Pekerjaan Beton Kolom
- Beton Cor K-225 m3 3.99 - -
- besi Beton Kg 505.59 - -
- Begesting 2 X pakai m2 71.40 - -
7 Pekerjaan Beton Balok Atap
- Beton Cor K-225 m3 6.68 - -
- besi Beton Kg 778.36 - -
- Begesting 2 X pakai m2 55.40 - -
8 Pekerjaan Pasangan Dinding Bata 1 Pc : 5 Ps m3 277.47 - -
9 Pekerjaan Plesteran Dinding 1 Pc : 4 Ps m3 554.94 - -
10 Pekerjaan Acian Dinding m3 507.01 - -
11 Pekerjaan Pas. Keramik Lantai 40 x 40 m2 145.49 - -
12 Pekerjaan Pas. Keramik Lantai 20 x 20 m2 3.45 - -
13 Pekerjaan Pas. Keramik Dinding 20 x 25 m2 15.78 - -
14 Pekerjaan Pas. Plin Keramik 40 x 10 m2 67.60 - -
Jumlah -

b Pekerjaan Kusen Pintu dan Jendela


1 Pekerjaan Kusen Pintu dan Jendela Kayu Kamper m3 1.05 - -
2 Pekerjaan Pintu Panil Kamper m2 16.80 - -
3 Pekerjaan Jendela Kaca t = 5 mm Frame Kayu Kamper m2 24.35 - -
4 Pekerjaan Ventilas Kaca t = 5 mm m2 0.81 - -
5 Pekerjaan Engsel Pintu bh 36.00 - -
6 Pekerjaan Handle dan Kunci Pintu bh 8.00 250,000.00 2,000,000.00
7 Pekerjaan Grendel Pintu bh 16.00 - -
8 Pekerjaan Engsel Jendela bh 48.00 - -
9 Pekerjaan Grendel Jendela bh 26.00 - -
10 Pekerjaan Kait Angin bh 56.00 - -
Jumlah 2,000,000.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
c Pekerjaan Atap dan Penutup Atap
1 Pekerjaan Rangka Atap Baja Ringan m2 228.16 175,000.00 39,928,000.00
2 Pekerjaan Genteng Kodong m2 274.53 - -
3 Pekerjaan Bubungan m' 35.84 - -
4 Pekerjaan Pasang Murda bh 2.00 - -
5 Pekerjaan Pasang Ikut Celedu bh 4.00 - -
6 Pekerjaan Lisplank 2 3x20 m' 62.32 - -
7 Pekerjaan Tatab m' 62.72 - -
8 Pekerjaan Plafond Calsibord Rangka Holow m2 160.00 - -
9 Pekerjaan List Plafond m' 193.00 - -
Jumlah 39,928,000.00
d Pekerjaan Finishing
1 Pekerjaan Pengecatan Dinding (Plamuur dan Cat Tembok) m2 507.01 - -
2 Pek. Pengecatan Plafond m2 160.00 - -
3 Pek. Politur Lisplank m2 46.74 - -
4 Pek. Pasangan Bata Paras Sangsit m2 36.16 - -
Jumlah -

B PEKERJAAN BANGUNAN RUMAH GENSET Err:509


1 PEKERJAAN TANAH
1 Pengukuran dan Pasang Bowplank m' 50.65 - -
2 Galian Tanah dengan excavator m3 354.93 - -
3 Urugan Tanah Kembali dengan Pemadatan m3 224.44 - -
4 Urugan Pasir di bawah lantai m3 13.93 - -
5 Urugan Pasir di bawah Pondasi t = 10 cm m3 38.00 - -
Jumlah -

2 PEKERJAAN STRUKTUR ATAU SIPIL DAN ASITEKTUR


a Pekerjaan Pasangan dan Beton
1 Pekerjaan Pasangan Batu Kosong m3 8.40 - -
2 Pekerjaan Pasangan Pondasi Batu Kali m3 42.10 - -
3 Pekerjaan Beton Rabat
- Cor Beton K125 m3 7.01 - -
4 Pekerjaan Beton pondasi Plat kaki
- Beton Cor K-225 m3 5.83 - -
- besi Beton Kg 2,974.19 - -
- Begesting Pasangan Batako 1:5 m2 15.36 - -
5 Pekerjaan Beton Sloope
- Beton Cor K-225 m3 5.04 - -
- besi Beton Kg 1,126.08 - -
- Begesting 2 X pakai m2 33.60 - -
6 Pekerjaan Beton Kolom
- Beton Cor K-225 m3 8.33 - -
- besi Beton Kg 2,121.56 - -
- Begesting 2 X pakai m2 105.18 - -
7 Pekerjaan Beton Lantai Dan Pondasi Genset
- Beton Cor K-300 m3 16.49 - -
- besi Beton Kg 270.78 - -
8 Pekerjaan Beton Balok Atap
- Beton Cor K-225 m3 11.42 - -
- besi Beton Kg 1,964.15 - -
- Begesting 2 X pakai m2 80.86 - -
9 Pekerjaan Beton Plat Atap
- Beton Cor K-225 m3 15.01 - -
- besi Beton Kg 2,016.08 - -
- Begesting 1 X pakai m2 124.82 - -
10 Pekerjaan Beton Listplank
- Beton Cor K-225 m3 3.10 - -
- besi Beton Kg 698.79 - -
- Begesting 2 X pakai m2 50.09 - -
11 Kolom Praktis dan Balok Latei
- Beton Cor K-225 m3 1.07 - -
- besi Beton Kg 224.43 - -
- Begesting 2 X pakai m2 21.38 - -
12 Pekerjaan Pasangan Dinding Bata 1 Pc : 4 Ps m3 197.50 - -
13 Pekerjaan Plesteran Dinding 1 Pc : 4 Ps m3 298.12 - -
14 Pekerjaan Acian Dinding m3 474.25 - -
15 Pekerjaan Water Proofing ( Atap ) m2 161.84 - -
16 Pekerjaan Beton Sloope, Ring Balk & Kolom Praktis m3 0.90 - -
17 Pekerjaan Pas. Keramik Lantai 30 x 30 m2 21.43 - -
Jumlah -
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
b Pekerjaan Kusen Pintu dan Jendela
1 Pekerjaan Kusen Pintu dan Jendela Aluminium m 21.16 - -
2 Pekerjaan Daun Jendela Jalusi m2 10.37 Err:509 Err:509
3 Pekerjaan Kusen Pintu Besi Profil C NP 140 x 60 x 7 mm m 29.63 - -
4 Pekerjaan Pintu Plat baja 2 sisi dalamnya Glass wool m2 13.68 - -
5 Pasang Engsel Pintu baja As 1" pasang 18.00 - -
6 Pasang Kunci Pintu Baja pasang 4.00 - -
7 Pasang Grendel Tanam untuk Pintu baja Set 4.00 - -
8 Talang Air Hujan m' 20.80 - -
9 Baut Angkur M22 Penjangkaran 1000 mm bh 10.00 - -
Jumlah Err:509

c Pekerjaan Finishing
1 Pekerjaan Pengecatan Dinding (Plamuur dan Cat Tembok) m2 437.28 - -
2 Pek. Pasangan Bata Paras Sangsit m2 25.90 - -
3 Pekerjaan Pasangan Pepalihan Style Bali (Batu Paras Sangsit) m2 90.12 - -
Jumlah -

C PEKERJAAN BANGUNAN RUMAH JAGA 52,532,023.10


1 PEKERJAAN TANAH
1 Pengukuran dan Pasang Bowplank m' 48.00 - -
2 Galian Tanah dengan excavator m3 44.55 - -
3 Urugan Tanah Kembali dengan Pemadatan m3 42.07 - -
4 Urugan Pasir t = 10 cm m3 4.72 - -
Jumlah -

2 PEKERJAAN STRUKTUR ATAU SIPIL DAN ASITEKTUR


a Pekerjaan Beton
1 Lantai Kerja K - 125
- Cor Beton K-125 m3 2.50 - -
2 Pekerjaan Sloof
- Beton Cor K-175 m3 1.49 - -
- Pekerjaan Besi Beton Kg 185.04 - -
- Begesting Pasangan Batako m2 27.23 - -
3 Pekerjaan Beton Kolom
- Beton Cor K-175 m3 8.91 - -
- besi Beton Kg 247.51 - -
- Begesting 2 X pakai m2 35.64 - -
4 Pekerjaan Beton Balok
- Beton Cor K-175 m3 1.64 - -
- besi Beton Kg 204.80 - -
- Begesting 2 X pakai m2 29.98 - -
5 Pekerjaan Beton Plat Atap
- Beton Cor K-175 m3 0.28 - -
- besi Beton Kg 83.46 - -
- Begesting 2 X pakai m2 8.40 - -
6 Pekerjaan Meja Beton
- Beton Cor K-175 m3 0.13 - -
- besi Beton Kg 27.94 - -
- Begesting 2 X pakai m2 2.37 - -
Jumlah -

b Pekerjaan Pasangan dan Pelapis


1 Pekerjaan Pasangan Batu Kosong m3 6.68 - -
2 Pekerjaan Pasangan Batu Kali Camp 1 : 5 m3 29.89 - -
3 Pekerjaan Pasangan Bata Camp 1:5 m2 131.27 - -
5 Pekerjaan Beton Tangga Teras m3 0.14 - -
6 Pekerjaan Batako Tangga Teras m2 6.20 - -
7 Pekerjaan Plesteran 1 PC : 5 PS m2 262.55 - -
8 Pekerjaan Acian m2 262.55 - -
9 Pekerjaan Cat Dinding m2 262.55 - -
10 Pekerjaan Tempelan Bata Gosok m2 38.64 - -
11 Pekerjaan Tempelan Batu Candi m2 12.08 - -
Jumlah -
c Pekerjaan Atap
1 Pekerjaan Rangka Kuda-Kuda Baja Ringan m2 80.00 225,000.00 18,000,000.00
2 Pekerjaan Pasangan Atap Genteng m2 103.61 - -
3 Pekerjaan Pas Bubungan m' 28.24 - -
4 Pekerjaan Pas. Ikut Celedu unit 4.00 - -
5 Pekerjaan Pas. Murda unit 2.00 - -
6 Pekerjaan Pas. Calistplank m' 36.40 - -
7 Pek. Cat Listplank m2 9.70 - -
Jumlah 18,000,000.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
d Pekerjaan Langit-Langit
1 Pas. Plafond Gypsum Rangka Hollow m3 80.00 - -
2 Pas. List Gypsum m' 103.70 - -
3 Pek. Cat Plafond m2 80.00 - -
Jumlah -
e Pekerjaan Penutup Lantai
1 Pekerjaan Keramik 60 x 60 m2 1.12 - -
2 Pekerjaan Keramik 40 x 40 m2 42.33 - -
3 Pekerjaan Keramik 20 x 20 m2 2.25 - -
4 Pekerjaan Plin Keramik 10 x 40 m2 68.16 - -
5 Pekerjaan Keramik Dinding 20 x 25 m2 11.48 - -
Jumlah -
f Pekerjaan Kusen Pintu dan Jendela
1 Pas. Kusen Kayu Kamper m3 0.66 - -
2 Pas. Daun Pintu Kayu Kamper m2 9.28 - -
3 Pas. Jendela Kaca m2 10.12 - -
4 Pas. Kaca Bening t = 5 mm m2 3.94 - -
5 Pas. Engsel Pintu set 8.00 - -
6 Pas. Grendel Pintu unit 2.00 - -
7 Pas. Handle & Kunci Pintu m' 3.00 - -
8 Pas. Engsel Jendela unit 20.00 - -
9 Pas. Grendel Jendela unit 10.00 - -
10 Pas. Kait Angin unit 20.00 - -
11 Pek. Polituran m2 85.92 - -
Jumlah -
g Pekerjaan Toilet
1 Instalasi Plumbing Air Bersih m 25.00 42,900.00 1,072,500.00
2 Instalasi Plumbing Air Kotor m 36.00 231,170.50 8,322,138.00
3 Closet Duduk bh 1.00 - -
4 Pasang Washtafel set 1.00 - -
5 Pasang Floor Drain set 1.00 - -
6 Pasang Kran air set 2.00 - -
7 Pekerjaan Septiktank unit 1.00 - -
8 Pekerjaan Peresapan unit 1.00 - -
Jumlah 9,394,638.00
g Pekerjaan Toilet
1 Lampu Down Light FBS110 E27 5W 220-240V unit 7.00 412,770.00 2,889,390.00
2 Lampu TL philips unit 2.00 544,770.00 1,089,540.00
3 Stop Kontak unit 9.00 42,380.00 381,420.00
4 Stop Kontak TV unit 1.00 42,380.00 42,380.00
5 Stop Kontak AC unit 1.00 42,380.00 42,380.00
6 Double Switch 10 A/ 220V plano unit 3.00 54,760.00 164,280.00
7 Single switch 10 A/ 220V plano unit 2.00 69,760.00 139,520.00
8 Exhaust fan, Industrial type, wall mounted, 16", komplit base frame unit 1.00 5,250,000.00 5,250,000.00
9 Air Conditioning unit 1.00 6,000,000.00 6,000,000.00
10 Instalasi titik lampu titik 9.00 294,712.00 2,652,408.00
11 Instalasi stop kontak titik 9.00 277,380.00 2,496,420.00
12 Instalasi stop kontak TV titik 1.00 277,380.00 277,380.00
13 Instalasi stop kontak AC titik 1.00 277,380.00 277,380.00
14 Instalasi saklar titik 5.00 277,380.00 1,386,900.00
15 Instalasi exhaust fan titik 1.00 281,713.00 281,713.00
16 Instalasi AC titik 1.00 281,713.00 281,713.00
Jumlah 23,652,824.00
h Panel penerangan R. Jaga
1 Box Plastic mini pragma pintu tranparant, inbow, 12 modul unit 1.00 205,458.00 205,458.00
2 MCB 3P/16A 10 KA unit 1.00 209,142.45 209,142.45
3 RCCB/ELCB, 4P, 25A, Sensitifitas : 30 mA unit 1.00 625,406.65 625,406.65
4 MCB 1P/6A 6 KA unit 6.00 44,455.40 266,732.40
5 MCB 1P/10A 6 KA unit 4.00 44,455.40 177,821.60
Jumlah 1,484,561.10

D PEKERJAAN PENATAAN HALAMAN/LANSCAPE 215,602,087.65

Pekerjaan Halaman/Lanscape
1 Pengukuran dan Pasang Bowplank m' 285.50 - -
2 Galian Tanah dengan excavator m3 17.98 - -
3 Pasangan Paving Block t = 10 cm m2 359.67 - -
6 Pekerjaan Kansteen m' 248.00 - -
7 Pas. Gasebo Unit 1.00 79,750,000.00 79,750,000.00
8 Penanaman Pohon Jepun Bali phn 10.00 1,796,733.92 17,967,339.16
9 Penanaman Pohon Palem Putri phn 15.00 1,250,000.00 18,750,000.00
10 Penanaman Pohon Dadap Merah phn 8.00 39,781.06 318,248.49
11 Penanaman Pohon Pucuk Merah phn 55.00 45,000.00 2,475,000.00
12 Penanaman Pohon Soka phn 123.00 15,500.00 1,906,500.00
13 Penanaman Pohon Cana phn 123.00 25,000.00 3,075,000.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
14 Penanaman Ruput Mutiara m2 450.00 40,000.00 18,000,000.00
15 Sign Board Style Bali Ls 1.00 73,360,000.00 73,360,000.00
Jumlah 215,602,087.65
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6

III PEKERJAAN MEKANIKAL DAN ELEKTRIKAL


A PEKERJAAN MEKANIKAL DAN ELEKTRIKAL BANGUNAN BAK INTAKE DAN RUMAH POMPA 14,900,363,651.52
a Pengadaan Mekanikal dan Accessories
1 Pengadaan Perpipaan dari Intake ke Reservoar
- 400 x 90 Steel Bend fl - fl unit 6.00 7,105,666.00 42,633,996.00
- 400 x 11 1/4 Steel Bend fl - fl unit 4.00 7,105,666.00 28,422,664.00
- 400 mm x 0,6 m' Double Flange unit 2.00 6,794,309.19 13,588,618.37
- 400 Flange las unit 10.00 1,489,000.00 14,890,000.00
- 400 DI Butterfly Valve fl - fl risilen seat unit 2.00 79,105,969.43 158,211,938.85
- 400 x 500 Steel Tee fl - fl unit 1.00 8,169,824.25 8,169,824.25
- 400 mm Karet Packing unit 10.00 242,220.00 2,422,200.00
- 1" x 5" Baud Mur unit 200.00 13,086.25 2,617,250.00
- Ø 500 mm Bell Mouth unit 1.00 6,192,978.00 6,192,978.00
- Ø 500 mm x 400 Reducer unit 1.00 3,712,944.00 3,712,944.00
2 Pompa dan Accessories
- Pompa Centifugal Q 165 l/dt - Head 200m' 390 KW Efisiensi 75 % Unit 2.00 1,583,272,940.85 3,166,545,881.70
- Pompa Centifugal Q 185 l/dt - Head 200m' 490 KW Efisiensi 75 % Unit 2.00 1,736,956,467.50 3,473,912,935.00
- Kabel Power NYFGBY 4 x 300 mm m' 600.00 1,215,500.00 729,300,000.00
- Panel Pompa Variable Speed Drive Paralel Alternate 3 x 250 KW set 1.00 1,903,040,000.00 1,903,040,000.00
- Panel Pompa Variable Speed Drive Paralel Alternate 2 x 250 KW set 1.00 1,170,000,000.00 1,170,000,000.00
3 Perpipaan Hisap (Suction)
- Ø 700 mm Header Steel Pipe m' 18.00 6,470,702.70 116,472,648.60
- Ø 700 mm Blank Flange unit 6.00 16,468,174.80 98,809,048.80
- Ø 700 mm Karet Packing unit 6.00 64,515.00 387,090.00
- Ø 250 mm Karet Packing unit 3.00 39,215.00 117,645.00
- Ø 400 mm x 0,60 m' ( Wall pipa ) unit 4.00 8,986,560.00 35,946,240.00
- Ø 400 mm Butterfly valve fl-fl resilient seat unit 7.00 76,835,088.00 537,845,616.00
- Ø 400 mm Flange Adaptor unit 4.00 5,692,500.00 22,770,000.00
- Ø 400 mm Flexible Joint unit 3.00 21,346,875.00 64,040,625.00
- Ø 400 mm x Ø 250 mm Steel Concentris Reducer fl -fl unit 3.00 5,009,400.00 15,028,200.00
- Ø 400 mm Flange las unit 19.00 860,200.00 16,343,800.00
- Ø 400 mm Karet Packing unit 25.00 41,188.40 1,029,710.00
- M24 Baud mur set 36.00 50,815.05 1,829,341.80
- M27 Baud mur set 400.00 55,896.56 22,358,622.00
- M39 Baud mur set 48.00 64,768.00 3,108,864.00
- Ø 400 DI Butterfly Valve fl - fl lengkap Pneumatic set 2.00 182,530,012.50 365,060,025.00
4 Perpipaan Tekan (Discharge) -
- Ø 250 mm DI Cek Valve PN 16 Resilian seat unit 3.00 39,630,729.60 118,892,188.80
- Ø 200 mm Karet Packing unit 3.00 29,095.00 87,285.00
- 12,5 mm x 0,50 Steel Pipa risser m' 3.00 51,485.50 154,456.50
- 12,5 mm Ball Valve unit 3.00 263,120.00 789,360.00
- Manometer Scala 0 - 15 Kg/cm2 unit 3.00 230,128.80 690,386.40
- Ø 300 mm Butterfly valve fl-fl resilient seat unit 3.00 45,059,496.08 135,178,488.23
- Ø 300 mm Flexible Joint unit 3.00 7,400,250.00 22,200,750.00
- Ø 300 mm x Ø 200 mm Steel Reducer fl -fl unit 3.00 3,125,865.60 9,377,596.80
- Ø 300 mm x 45 Steel Bend fl - fl unit 3.00 1,328,250.00 3,984,750.00
- Ø 300 mm Flange las unit 3.00 1,012,000.00 3,036,000.00
- Ø 300 mm Karet Packing unit 18.00 42,377.50 762,795.00
- M24 Baud mur set 216.00 50,815.05 10,976,050.80
- M20 Baud mur set 36.00 45,733.55 1,646,407.62
- Ø 700 mm DI Gate Valve metal resilient Seated all flange unit 1.00 153,670,176.00 153,670,176.00
- Ø 700 mm DI Cek Valve PN 16 Resilian seat unit 1.00 202,400,241.62 202,400,241.62
- Box Uk. 2,4x 1,5 x 1,5 m' unit 2.00 16,603,125.00 33,206,250.00
5 Perpipaan Pengumpul (Header)
- Ø 700 mm Header Steel Pipe m' 10.50 6,470,702.70 67,942,378.35
- Ø 700 mm Flange las unit 8.00 14,325,973.20 114,607,785.60
- Ø 700 mm Blank Flange unit 1.00 16,468,174.80 16,468,174.80
- Ø 700 mm Karet Packing unit 2.00 64,515.00 129,030.00
- Ø 700 mm Karet Packing unit 7.00 64,515.00 451,605.00
- Ø 700 mm Steel Pipe m' 83.00 6,470,702.70 537,068,324.10
- Ø 700 mm x 45° Steel Bend flange - flange unit 2.00 11,195,250.00 22,390,500.00
- Ø 700 mm x 11.25° Steel Bend flange - flange unit 5.00 4,781,700.00 23,908,500.00
- M39 Baud mur set 216.00 64,768.00 13,989,888.00
6 Perpipaan Over Flow dan Penguras
- Ø 300 mm Overflow Steel Pipe m' 10.00 2,988,478.16 29,884,781.62
- Ø 300 mm Penguras Steel Pipe m' 82.00 2,988,478.16 245,055,209.32
- Ø 300 mm Penguras PVC m' 50.00 1,351,968.75 67,598,437.50
- Ø 200 mm Penguras PVC m' 71.50 464,887.50 33,239,456.25
- A.F. Gate Valve PN 10 Ø 300 mm unit 3.00 16,445,000.00 49,335,000.00
- Cek Valve Ø 300 mm Steel unit 3.00 20,966,490.77 62,899,472.30
- Cek Valve Ø 200 mm Steel unit 1.00 16,773,192.61 16,773,192.61
- Ø 300 mm Karet Packing unit 10.00 42,377.50 423,775.00
- Ø 200 mm Karet Packing unit 2.00 29,095.00 58,190.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Ø 300 mm Flange las unit 10.00 1,012,000.00 10,120,000.00
- Ø 200 mm Flange Las unit 2.00 521,180.00 1,042,360.00
- M24 Baud mur set 120.00 50,815.05 6,097,806.00
- M20 Baud mur set 24.00 45,733.55 1,097,605.08
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
7 Sarana Prasarana
- Electric Motor Hoist kapasitas 5 Ton Horizontal dan Vertical, lengkap dengan unit 1.00 77,880,000.00 77,880,000.00
- Electric Motor Hoist crane, Kapasitas 2 ton, lengkap dengan span, flat bar, c set 1.00 45,424,896.00 45,424,896.00
- Pengadaan dan Pemasangan Extended Stem Valve set 3.00 2,383,562.50 7,150,687.50
- IWF Baja 150 x 300 mm Kg 480.00 32,948.30 15,815,184.00
b Pemasangan Mekanikal dan Accesories 0
1 Pengadaan Perpipaan dari Intake ke Reservoar
400 x 90 Steel Bend fl - fl unit 6.00 293,195.38 1,759,172.25
400 x 11 1/4 Steel Bend fl - fl unit 4.00 293,195.38 1,172,781.50
400 mm x 0,6 m' Double Flange unit 2.00 160,971.25 321,942.50
400 Flange las unit 10.00 783,066.63 7,830,666.25
400 DI Butterfly Valve fl - fl risilen seat unit 2.00 247,636.40 495,272.80
400 x 500 Steel Tee fl - fl unit 1.00 293,195.38 293,195.38
400 mm Karet Packing unit 10.00 1,795.90 17,959.05
1" x 5" Baud Mur unit 200.00 1,026.23 205,246.25
Ø 500 mm Bell Mouth unit 1.00 327,540.13 327,540.13
Ø 500 mm x 400 Reducer unit 1.00 327,540.13 327,540.13
2 Pompa dan Accessories
- Pompa Centifugal Q 165 l/dt - Head 200m' 390 KW Efisiensi 75 % Unit 2.00 11,145,713.87 22,291,427.73
- Pompa Centifugal Q 185 l/dt - Head 200m' 490 KW Efisiensi 75 % Unit 2.00 11,145,713.87 22,291,427.73
- Kabel Power NYFGBY 4 x 300 mm m' 600.00 36,432.00 21,859,200.00
- Panel Pompa Variable Speed Drive Paralel Alternate 3 x 250 KW set 1.00 18,975,000.00 18,975,000.00
- Panel Pompa Variable Speed Drive Paralel Alternate 2 x 250 KW set 1.00 18,975,000.00 18,975,000.00
3 Perpipaan Hisap (Suction) ###
- Ø 700 mm Header Steel Pipe m' 18.00 444,423.37 7,999,620.61
- Ø 700 mm Blank Flange unit 6.00 1,341,372.79 8,048,236.76
- Ø 400 mm x 0,60 m' ( Wall pipa ) unit 4.00 160,971.25 643,885.00
- Ø 400 mm Butterfly valve fl-fl resilient seat unit 7.00 247,636.40 1,733,454.80
- Ø 400 mm Flange Adaptor unit 4.00 783,066.63 3,132,266.50
- Ø 400 mm Flexible Joint unit 3.00 783,066.63 2,349,199.88
- Ø 400 mm x Ø 250 mm Steel Concentris Reducer fl -fl unit 3.00 260,286.40 780,859.20
- Ø 400 mm Flange las unit 19.00 783,066.63 14,878,265.88
- Ø 400 mm Karet Packing unit 25.00 1,795.90 44,897.62
- Ø 700 mm Karet Packing unit 6.00 1,795.90 10,775.43
- Ø 250 mm Karet Packing unit 3.00 1,795.90 5,387.71
- M24 Baud mur set 36.00 1,026.23 36,944.33
- M27 Baud mur set 400.00 1,026.23 410,492.50
- M39 Baud mur set 48.00 1,026.23 49,259.10
- Ø 400 DI Butterfly Valve fl - fl lengkap Pneumatic set 2.00 563,561.56 1,127,123.13
4 Perpipaan Tekan (Discharge) ###
- Ø 250 mm DI Cek Valve PN 16 Resilian seat unit 3.00 247,136.73 741,410.18
- 12,5 mm x 0,50 Steel Pipa risser m' 3.00 6,538.20 19,614.61
- 12,5 mm Ball Valve unit 3.00 6,538.20 19,614.61
- Manometer Scala 0 - 15 Kg/cm2 unit 3.00 6,538.20 19,614.61
- Ø 300 mm Butterfly valve fl-fl resilient seat unit 3.00 247,339.13 742,017.38
- Ø 300 mm Flexible Joint unit 3.00 599,981.59 1,799,944.78
- Ø 300 mm x Ø 200 mm Steel Reducer fl -fl unit 3.00 149,301.63 447,904.88
- Ø 300 mm x 45 Steel Bend fl - fl unit 3.00 157,113.00 471,339.00
- Ø 300 mm Flange las unit 3.00 599,981.59 1,799,944.78
- Ø 300 mm Karet Packing unit 18.00 599,981.59 10,799,668.69
- M24 Baud mur set 216.00 599,981.59 129,596,024.25
- M20 Baud mur set 36.00 599,981.59 21,599,337.38
Ø 700 mm DI Gate Valve metal resilient Seated all flange unit 1.00 325,497.15 325,497.15
Ø 700 mm DI Cek Valve PN 16 Resilian seat unit 1.00 325,497.15 325,497.15
Box Uk. 2,4x 1,5 x 1,5 m' unit 2.00 14,231,255.06 28,462,510.12
Ø 200 mm Karet Packing unit 3.00 1,795.90 5,387.71
5 Perpipaan Pengumpul (Header) ###
- Ø 700 mm Header Steel Pipe m' 10.50 444,423.37 4,666,445.36
- Ø 700 mm Flange las unit 8.00 1,341,372.79 10,730,982.35
- Ø 700 mm Blank Flange unit 1.00 1,341,372.79 1,341,372.79
- Ø 700 mm Steel Pipe m' 83.00 444,423.37 36,887,139.49
- Ø 700 mm x 45° Steel Bend flange - flange unit 2.00 183,456.06 366,912.11
- Ø 700 mm x 11.25° Steel Bend flange - flange unit 5.00 183,456.06 917,280.28
- M39 Baud mur set 216.00 1,026.23 221,665.95
- Ø 700 mm Karet Packing unit 9.00 1,795.90 16,163.14
6 Perpipaan Over Flow dan Penguras ###
- Ø 300 mm Overflow Steel Pipe m' 10.00 225,748.85 2,257,488.51
- Ø 300 mm Penguras Steel Pipe m' 82.00 225,748.85 18,511,405.81
- Ø 300 mm Penguras PVC m' 50.00 50,316.25 2,515,812.67
- Ø 200 mm Penguras PVC m' 71.50 50,316.25 3,597,612.12
- A.F. Gate Valve PN 10 dia. 300 mm unit 3.00 247,339.13 742,017.38
- Cek Valve Ø 300 mm Steel unit 2.00 247,339.13 494,678.25
- Cek Valve Ø 200 mm Steel unit 1.00 247,136.73 247,136.73
- Ø 300 mm Karet Packing unit 10.00 247,136.73 2,471,367.25
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Ø 200 mm Karet Packing unit 2.00 247,136.73 494,273.45
- Ø 300 mm Flange Las unit 10.00 599,981.59 5,999,815.94
- Ø 200 mm Flange Las unit 2.00 422,645.99 845,291.98
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- M24 Baud mur set 120.00 1,026.23 123,147.75
- M20 Baud mur set 24.00 1,026.23 24,629.55
7 Sarana Prasarana ###
- Electric Motor Hoist kapasitas 5 Ton Horizontal dan Vertical lengkap dengan unit 1.00 12,074,523.67 12,074,523.67
- Electric Motor Hoist crane, Kapasitas 2 ton, lengkap dengan span, flat bar, c set 1.00 381,966.75 381,966.75
- IWF Baja 150 x 300 mm Kg 480.00 17,393.75 8,349,000.00
Jumlah 14,658,561,624.81
###
c Pengadaan Elektrikal dan Accesories ###
1 Panel Kontrol Distribusi ###
- Box Plate metal, 3400x2100x1000 mm, Floor Standing Unit 1.00 14,587,727.00 14,587,727.00
- MCCB 3 POLE, 630 A Unit 1.00 10,564,192.10 10,564,192.10
- Current Transformator 1000/5 A Unit 3.00 958,288.10 2,874,864.30
- Power Meter Digital Unit 1.00 2,125,200.00 2,125,200.00
- Indicator Lamp R, S, T Unit 3.00 72,611.00 217,833.00
- LAMPU TL 10 watt Unit 3.00 75,267.50 225,802.50
- MINI FUSE 2A Unit 3.00 161,869.40 485,608.20
- Push Bottom Unit 6.00 72,611.00 435,666.00
- Emergency Push Button Unit 1.00 455,678.30 455,678.30
- Buzzer, 70 dBA Unit 1.00 23,402.50 23,402.50
- Plug in relay 220V, 14 pin, 4 kontak C/O, 5 amp, built in pilot light, kom Unit 12.00 53,762.50 645,150.00
- Illuminated Push Button, 220VAC Unit 6.00 547,239.00 3,283,434.00
- Selector Switch 3 Posisi Unit 3.00 393,339.10 1,180,017.30
- 3 POLE, 1000 A Unit 1.00 354,200.00 354,200.00
- MCB 3 POLE, 6 A Unit 5.00 1,513,142.40 7,565,712.00
- MCB 3 POLE, 10 A Unit 1.00 1,513,142.40 1,513,142.40
- MAGNETIC CONTACTOR LC1-F500 Unit 4.00 4,584,056.40 18,336,225.60
- Power Supply DC 220VAC / 24VDC 10A Unit 1.00 6,914,869.50 6,914,869.50
- Kabel tray 200x 100 Btg 3.00 3,266,432.40 9,799,297.20
- Grounding, Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 928,809.55 928,809.55
2 Panel Meja Kontrol Filter Utama - ###
- Box Plate metal, 1250x1600x1040 mm, FS Meja Unit 1.00 17,710,000.00 17,710,000.00
- MCB 1P/4A 6 KA unit 3.00 185,955.00 557,865.00
- Plug in relay 220V, 14 pin, 4 kontak C/O, 5 amp, built in pilot light, kom unit 36.00 53,762.50 1,935,450.00
- Illuminated Push Button, 220VAC unit 36.00 547,239.00 19,700,604.00
- Selector Switch 3 Posisi unit 7.00 393,339.10 2,753,373.70
- Power Supply DC 220VAC / 24VDC 10A unit 1.00 6,914,869.50 6,914,869.50
- Push Bottom unit 2.00 72,611.00 145,222.00
- Indicator Lamp R, S, T unit 2.00 72,611.00 145,222.00
- Air Regulator unit 1.00 2,528,988.00 2,528,988.00
- Air Pressure Switch unit 1.00 2,862,644.40 2,862,644.40
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 928,809.55 928,809.55
3 Panel Filter ( Selenoid ) - ###
- Panel Lokal Filter Outdoor type double door dengan support unit 6.00 6,198,500.00 37,191,000.00
- Plug in relay 220V, 14 pin, 4 kontak C/O, 5 amp, built in pilot light, kom unit 30.00 53,762.50 1,612,875.00
- Illuminated Push Button Green, 220VAC unit 30.00 547,239.00 16,417,170.00
- Illuminated Push Button Red, 220VAC unit 30.00 547,239.00 16,417,170.00
- Selector Switch 3 Posisi unit 30.00 393,339.10 11,800,173.00
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 928,809.55 928,809.55
4 Instalasi Penerangan R. Pompa - ###
- Lampu TL 2 X 18 watt unit 12.00 75,267.50 903,210.00
- Lampu TL 2 x 36 watt unit 9.00 75,267.50 677,407.50
- Outlet 10 A/2P+E 220V unit 1.00 196,581.00 196,581.00
- Stop kontak AC unit 1.00 44,275.00 44,275.00
- Double Switch 10 A/ 220V plano unit 2.00 26,565.00 53,130.00
- Single switch 10 A/ 220V plano unit 2.00 21,505.00 43,010.00
- Instalasi titik lampu titik 21.00 677,407.50 14,225,557.50
- Instalasi stop kontak titik 2.00 451,605.00 903,210.00
- Kabel dari penerangan Pompa ke Panel Pompa Distribusi - ###
- - NYY 5 x 2,5 mm2 meter 15.00 50,650.60 759,759.00
Jumlah 240,873,217.16

d Pemasangan Elektrikal dan Accesories


1 Panel Penerangan Ruang Kantor (PP-KR) ###
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 928,809.55 928,809.55
Jumlah 928,809.55

B PEKERJAAN MEKANIKAL DAN ELEKTRIKAL BANGUNAN GENSET 4,861,615,413.72


a Pengadaan Mekanikal dan Accessories

Generator set, Kapasitas: 1250 kW, 380/220V, komplit tangki harian dengan
1 perpipaan, kontrol panel PCC, karet peredam getaran, peredam suara dan set 1 3,000,054,852.96 3,000,054,852.96
kelengkapan lainnya (Lihat spesifikasi khusus)

Fuel Storage tank procurement cap. of 5.000 lt termasuk Suporting material,


2 termasuk perpipaan, strainer, level switch pada control panel bahan bakar, pompa unit 1 123,572,053.44 123,572,053.44
tangan, electric pump dll.
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
Fuel Storage tank procurement cap. of 5.000 lt termasuk Suporting material, ( Rp ) ( Rp )
12 termasuk perpipaan, strainer, level switch pada
2 control panel bahan bakar, pompa unit
3 1
4 123,572,053.44
5 123,572,053.44
6
tangan, electric pump dll.
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
Pengadaan dan pemasangan Rock Wool, tebal 5cm (2") pada dinding dalam
Ruangan, Kawat anyaman galvanized untuk pelindung bahan Glass wool dan kain
3 m2 135.55 383,638.73 52,002,229.58
pembungkus tahan api
Generator set, lengkap dengan pelidung kain Catton tebal dan kawat Ram.
Jumlah 3,175,629,135.98
b Pemasangan Makanikal dan Accessories
Generator set, Kapasitas: 1000 kW, 380/220V, komplit tangki harian dengan
1 perpipaan, kontrol panel PCC, karet peredam getaran, peredam suara dan set 1 67,843,480.32 67,843,480.32
kelengkapan lainnya (Lihat spesifikasi khusus)

Fuel Storage tank procurement cap. of 5.000 lt termasuk Suporting material,


2 termasuk perpipaan, strainer, level switch pada control panel bahan bakar, pompa ls 1 4,038,302.40 4,038,302.40
tangan, electric pump dll.
Jumlah 71,881,782.72
c Pengadaan Elektrikal dan Accessories
1 Trafo dan panel TM
- Trafo 1250 kVA, 20kV/380-220V, Dyn 5, dan kelengkapannya. set 1.00 353,574,974.67 353,574,974.67
Panel Tegangan Menengah (cubicle) 24 kV, incoming dan outgoing with
- set
circuit breaker 1.00 239,800,000.00 239,800,000.00
2 Panel Automatic Main Failure (AMF) dan Change Over Switch (COS)

- Panel Automatic Main Failure untuk Genset Cap 1250 KvA, dengan PCC 1.00 444,213,264.00
set 444,213,264.00

- Change Over Switch untuk kapasitas daya 1500 KvA, plus interlock system 1.00
set 6,970,109.94 6,970,109.94
- Box Panel, ukuran T:1800 X L:800 X D:600, free standing type set 1.00 3,850,000.00 3,850,000.00
3 Panel Induk Utama, LVM-DP
- Box Plate metal, 2000x(800+800+800)x1000 mm, Floor Standing unit 1.00 3,850,000.00 3,850,000.00
- Bus Bar 3P+N/2000A + PE dan accessories set 1.00 6,978,186.55 6,978,186.55
ACB 4P/(640-2000)A 50KA (Min) dilengkapi dengan unit trip Motor
- mechanism module 220/240V AC dan kontak-kontak bantu (Lihat spek set 1.00 9,058,500.00 9,058,500.00
khusus)
- MCCB 4P(25-40)A 25KA + electronic trip ke Kantor pengelola set 1.00 2,162,050.00 2,162,050.00
- MCCB 3P(13-16)A 25KA + electronic trip ke PP. R Genset + PJU set 1.00 2,162,050.00 2,162,050.00
- Pilot lamp, Ø 22mm, plastic 220-240 VAC set 8.00 8,800.00 70,400.00
- Push button modular plastic 220-240 VAC set 4.00 42,900.00 171,600.00
Accessories penunjang termasuk relay bantu, isolator kabel-kabel, terminal,
- fuse, ls 1.00 1,211,490.72 1,211,490.72
supporting fanel dll sebagai pelengkap system
- Kapasitor bank, komplit lamp, push button (500 kvar) (LVMDP) set 1.00 250,232,730.00 250,232,730.00
- MCCB 3 POLE, 1000 A Unit 1.00 46,200,000.00 46,200,000.00
- MCCB 3 POLE, 160 A Unit 1.00 10,876,250.00 10,876,250.00
- MCB 1P/6A 6 KA Unit 6.00 40,414.00 242,484.00
- Mini Fuse Unit 6.00 140,756.00 844,536.00
Plug in relay 220V, 14 pin, 4 kontak C/O, 5 amp, built in pilot light,
- Unit 10.00 46,750.00 467,500.00
komplit dengan dudukan
- Indikator Lamp, Pilot Lamp Ø22mm, 220V Unit 8.00 77,000.00 616,000.00
- Illuminated Push Button, 220VAC Unit 4.00 475,860.00 1,903,440.00
- Power Meter Digital Unit 1.00 1,848,000.00 1,848,000.00
- Current Transformator 2000/5A Unit 6.00 4,383,918.00 26,303,508.00
- Selector Switch 3 Posisi Unit 2.00 342,034.00 684,068.00
- Box Plate metal, 500 x 400 200 mm, Wall Mounting Unit 1.00 3,518,592.00 3,518,592.00
4 Panel Penerangan Ruang Listrik Utama (PP-RL)
- Box Plastic mini pragma pintu tranparant, inbow, 24 modul unit 1.00 297,880.00 297,880.00
- MCB 3P/16A 10 KA unit 1.00 190,129.50 190,129.50
- RCCB/ELCB, 4P, 25A, Sensitifitas : 30 mA unit 1.00 568,551.50 568,551.50
- MCB 1P/6A 6 KA unit 3.00 40,414.00 121,242.00
- MCB 1P/10A 6 KA unit 4.00 40,414.00 161,656.00
- Box Plate metal, 600x500x200 mm, Wall Mounting unit 1.00 4,620,000.00 4,620,000.00
- MCB 3P/6A, 6 KA unit 1.00 1,315,776.00 1,315,776.00
- RCCB/ELCB, 4P, 10A, Sensitifitas : 30 mA unit 1.00 930,160.00 930,160.00
- MCB 1P/4A 6 KA unit 15.00 161,700.00 2,425,500.00
- Time Switch 24 Jam unit 1.00 1,319,472.00 1,319,472.00
- Magnetic Contactor 10A unit 1.00 1,391,852.00 1,391,852.00
- Indikator Lamp, Pilot Lamp Ø22mm, 220V unit 3.00 77,000.00 231,000.00
- Mini Fuse 2A unit 3.00 140,756.00 422,268.00
- Selector Switch 3 Posisi unit 1.00 342,034.00 342,034.00
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 807,660.48 807,660.48
5 Penerangan Ruang listrik utama
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 8.00 396,000.00 3,168,000.00
- Lampu philips 36W/220V, Industrial Type unit 1.00 284,296.49 284,296.49
- Lampu philips 2 x 36W/220V, Water proof unit 4.00 528,000.00 2,112,000.00
- Single switch 10 A/ 220V plano unit 6.00 18,700.00 112,200.00
- Double Switch 10 A/ 220V plano unit 2.00 23,100.00 46,200.00
- Outlet 10A / 220 V unit 2.00 92,073.30 184,146.60
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 2.00 253,605.40 507,210.79
- Kabel NYM 3 x 2,5 mm2 m 160.00 14,300.00 2,288,000.00
- uPVC Conduit 20 m m 140.00 8,635.00 1,208,900.00
- uPVC Conduit 25 m m 2.00 17,600.00 35,200.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Exhaust fan, Industrial type, wall mounted, 16", komplit base frame set 2.00 583,000.00 1,166,000.00
- Lampu TL / DL 2 X 18 watt unit 21.00 65,450.00 1,374,450.00
- Lampu PJU, 56 watt + timer unit 30.00 77,000.00 2,310,000.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Outlet 10 A/2P+E 220V unit 4.00 170,940.00 683,760.00
- Double Switch 10 A/ 220V plano unit 4.00 23,100.00 92,400.00
- Exhaust Fan 16 Inch, 80 watt ( 2 unit di R. panel LVMDP) unit 5.00 1,707,860.00 8,539,300.00
- Kabel penerangan ke PJU
- - NYFGBY 2 x 4 mm2 meter 612.00 43,274.00 26,483,688.00
- Kabel penerangan ke PJU
- - NYFGBY 2 x 2,5 mm2 meter 163.00 40,348.00 6,576,724.00
- Kabel dari LVMDP ke P. Penerangan R. Genset
- NYFGBY 4 x 6 mm2 meter 12.00 72,380.00 868,560.00
- - BC 4 mm2 meter 10.00 31,416.00 314,160.00
- MCB 4 Amp untuk tiap2 tiang lampu unit 10.00 266,112.00 2,661,120.00
- Instalasi titik lampu titik 21.00 589,050.00 12,370,050.00
- Intalasi titik lampu PJU titik 30.00 654,500.00 19,635,000.00
- Instalasi Stop kontak titik 4.00 392,700.00 1,570,800.00
- Instalasi exhaust fan titik 5.00 392,700.00 1,963,500.00
Jumlah 1,529,510,581.23
d Pengadaan Elektrikal dan Accessories
1 Trafo dan panel TM
- Trafo 1250 kVA, 20kV/380-220V, Dyn 5, dan kelengkapannya. set 1.00 12,276,439.30 12,276,439.30
Panel Tegangan Menengah (cubicle) 24 kV, incoming dan outgoing with
- set 1.00 12,114,907.20 12,114,907.20
circuit breaker
2 Panel Automatic Main Failure (AMF) dan Change Over Switch (COS)

- Panel Automatic Main Failure untuk Genset Cap 1250 KvA, dengan PCC set - 8,076,604.80 -

- Change Over Switch untuk kapasitas daya 1500 KvA, plus interlock system set 1.00 48,459,628.80 48,459,628.80

- Box Panel, ukuran T:1800 X L:800 X D:600, free standing type set 1.00 8,076,604.80 8,076,604.80
3 Panel Induk Utama, LVM-DP
- Perakitan dan Pemasangan lengkap termasuk aksesoris set 1.00 807,660.48 807,660.48
4 Panel Penerangan Ruang Listrik Utama (PP-RL)
- Perakitan dan Pemasangan lengkap termasuk aksesoris set 1.00 807,660.48 807,660.48
5 Penerangan Ruang listrik utama
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 8.00 40,370.00 322,960.00
- Lampu philips 36W/220V, Industrial Type unit 1.00 40,370.00 40,370.00
- Lampu philips 2 x 36W/220V, Water proof unit 4.00 40,370.00 161,480.00
- Outlet 10A / 220 V unit 2.00 24,200.00 48,400.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 2.00 24,200.00 48,400.00

- Exhaust fan, Industrial type, wall mounted, 16", komplit base frame set 2.00 242,220.00 484,440.00

- Titik lampu titik 13.00 72,689.44 944,962.73


Jumlah 84,593,913.79

C PEKERJAAN MEKANIKAL DAN ELEKTRIKAL DILUAR BANGUNAN 3,980,143,835.31


a Pengadaan kabel-kabel
1 Kabel dari PLN ke Panel TM, Primer Trafo, Sekunder Trafo, Genset, MDP ke masing - masing panel (Air Baku, Air bersih, Blower, Dosing, Panel Penerangan, Genset )
- Dari meter PLN ke Panel TM (cubicle)
- Kabel XLPE 1 x 70 mm2 12/20/kV m 1,300.00 158,400.00 205,920,000.00
- Terminating kabel XLPE, 70 mm2 set 6.00 5,088,261.02 30,529,566.14
- Dari meter Panel TM (cubicle) ke primer trafo
- Kabel XLPE 1 x 70 mm2 12/20/kV m 30.00 158,400.00 4,752,000.00
- Terminating kabel XLPE, 70 mm2 set 6.00 5,088,261.02 30,529,566.14
- Dari Sekunder trafo ke Panel MDP
- Kabel NYY 1 x 500 mm2 m 80.00 434,500.00 34,760,000.00
- Dari Generator 2x625 kVA ke Panel MDP
- Kabel NYY 1 x 300 mm2 m 120.00 269,500.00 32,340,000.00
- Kabel NYY 1 x 500 mm2 m 40.00 434,500.00 17,380,000.00
- Kabel NYA 1 x 120 mm2 m 30.00 104,500.00 3,135,000.00
- Dari Panel MDP ke panel PC-ABK (Air Baku)
- Kabel NYFGbY 4 x 300 mm2 m 80.00 1,028,500.00 82,280,000.00
- Kabel NYA 1 x 120 mm2 m 80.00 104,500.00 8,360,000.00
- Kabel NYFGbY 4 x 95 mm2 m 80.00 335,500.00 26,840,000.00
- Kabel NYA 1 x 70 mm2 m 80.00 59,400.00 4,752,000.00
- Dari MDP ke Panel TB-G (terminal Box Grounding)
- Kabel NYA 1 x 120 mm2 m 9.00 104,500.00 940,500.00
- Dari panel TB-G ke box control
- Kabel NYA 1 x 120 mm2 m 24.00 104,500.00 2,508,000.00
- Acessories
- GIP 1 " m 4.00 63,966.71 255,866.82
- GIP 2" m 20.00 123,200.00 2,464,000.00
- GIP 3" m 8.00 181,720.00 1,453,760.00
- GIP 4" m 16.00 281,204.00 4,499,264.00
2 Kabel daya ke sub panel / panel penerangan
- Dari Panel MDP ke panel PP-RL
- Kabel NYY 4 x 4 mm2 m 7.00 33,000.00 231,000.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Kabel NYA 1 x 6 mm2 m 7.00 9,240.00 64,680.00
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Dari Panel M-PK ke panel PP-RJ (PP Ruang Jaga)
- Kabel NYFGbY 3 x 4 mm2 m 40.00 26,950.00 1,078,000.00
- GIP 1 " m 3.00 63,966.71 191,900.12
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
- Dari Panel M-PK ke panel PP-RK
- Kabel NYY 4 x 4 mm2 m 25.00 33,000.00 825,000.00
- Kabel NYA 1 x 6 mm2 m 25.00 9,240.00 231,000.00
- GIP 1 " m 2.00 63,966.71 127,933.41
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
- Dari Panel M-PK ke panel PP-KR
- Kabel NYY 4 x 6 mm2 m 20.00 46,200.00 924,000.00
- Kabel NYA 1 x 6 mm2 m 20.00 9,240.00 184,800.00
- GIP 1 " m 2.00 63,966.71 127,933.41
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
- Dari Panel PC-ABK ke panel PP-ABK
- Kabel NYY 4 x 4 mm2 m 7.00 33,000.00 231,000.00
- Kabel NYA 1 x 6 mm2 m 7.00 9,240.00 64,680.00
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
- Dari Panel F-FL ke panel PP - RL2
- Kabel NYY 4 x 6 mm2 m 7.00 46,200.00 323,400.00
- Kabel NYA 1 x 6 mm2 m 7.00 9,240.00 64,680.00
- Dari Panel M-FL ke panel PP-FL
- Kabel NYY 4 x 6 mm2 m 7.00 46,200.00 323,400.00
- Kabel NYA 1 x 6 mm2 m 7.00 9,240.00 64,680.00
- GIP 1 " m 2.00 63,966.71 127,933.41
- Dari Panel M-FL ke Panel PC-BWR
- Kabel NYY 4 x 4 mm2 m 150.00 33,000.00 4,950,000.00
- Kabel NYA 1 x 6 mm2 m 40.00 9,240.00 369,600.00
- Dari panel M-FL ke panel MOBV filter
- Kabel NYY 4 x 2.5 mm2 m 150.00 22,000.00 3,300,000.00
- Dari Panel M-FL ke panel PC-BWR
- Kabel NYFGbY 4 x 25 mm2 m 80.00 104,500.00 8,360,000.00
- Kabel NYA 1 x 25 mm2 m 80.00 23,100.00 1,848,000.00
- GIP 2" m 8.00 123,200.00 985,600.00
- Dari Panel PC-BWR ke panel PP-BWR
- Kabel NYY 3x4 mm2 m 7.00 25,300.00 177,100.00
- Kabel NYA 1 x 6 mm2 m 7.00 9,240.00 64,680.00
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
- Dari Panel PC-BW ke panel PP-BW
- Kabel NYY 4 x 4 mm2 m 7.00 33,000.00 231,000.00
- Kabel NYA 1 x 6 mm2 m 7.00 9,240.00 64,680.00
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
- Dari Panel PC-AB ke panel PP-LR3
- Kabel NYFGbY 4 x 6 mm2 m 15.00 39,600.00 594,000.00
- Kabel NYA 1 x 6 mm2 m 15.00 9,240.00 138,600.00
- Dari panel PP - LR3 ke panel PP-PJ
- Kabel NYY 4 x 4 mm2 m 7.00 33,000.00 231,000.00
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
- Dari Panel PC-AB ke panel PP-AB
- Kabel NYY 4 x 4 mm2 m 7.00 33,000.00 231,000.00
- Kabel NYA 1 x 6 mm2 m 7.00 9,240.00 64,680.00
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
- Dari Panel PC-ABK ke panel PP-LR1
- Kabel NYFGbY 4 x 6 mm2 m 15.00 39,600.00 594,000.00
- Kabel NYA 1 x 6 mm2 m 15.00 9,240.00 138,600.00
3 Kabel daya dan kontrol dari masing - masing panel kontrol ke masing - masing motor, ukuran kabel sesuai dengan spesifikasi masing - masing motor
- Dari Panel PC -AB ke terminal motor, pompa Air Bersih
- Kabel NYY 3 x 70 mm2 m 120.00 187,000.00 22,440,000.00
- Kabel NYA 1 x 70 mm2 m 60.00 59,400.00 3,564,000.00
- Dari Panel PC-ABK ke LCP-ABK 1/2/3
- Kabel NYY 3 x 2.5 mm2 m 66.00 16,500.00 1,089,000.00
- Acessories
- Supporting kabel/rak LS 1.00 7,995,838.75 7,995,838.75
4 Pekerjaan kabel ( Ruang Genset )
- Kabel dari Cubicle PLN ke Cubicle User
- XLPE 3 x (1 x 70mm2) meter 20.00 455,840.00 9,116,800.00
- Kabel dari LVMDP ke Genset
- NYFGBY 4 x (4 x 300 mm2) meter 15.00 10,780,000.00 161,700,000.00
- Kabel dari Cubicle ke travo
- XLPE 3 x (1 x 70mm2) meter 10.00 455,840.00 4,558,400.00
- Kabel dari Travo ke LVMDP
- NYY 3 x (4 x 1 x 500 mm2) meter 15.00 3,537,155.89 53,057,338.35
- NYY 1 x (2 x 1 x 500 mm2) meter 15.00 2,667,280.00 40,009,200.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
5 Instalasi Pentanahan
- Grounding untuk Cubicle Netral PLN
- BC 35 mm2 meter 20.00 91,168.00 1,823,360.00
- Grounding rod 3/4 batang 4.00 2,266,880.00 9,067,520.00
- Grounding untuk Spare
- BC 35 mm2 meter 17.00 91,168.00 1,549,856.00
- Grounding rod 3/4 batang 4.00 2,266,880.00 9,067,520.00
- Grouding Netral Genset
- BC 35 mm2 meter 27.00 91,168.00 2,461,536.00
- Grounding rod 3/4 batang 4.00 2,266,880.00 9,067,520.00
- Grounding Netral Travo
- BC 35 mm2 meter 31.00 91,168.00 2,826,208.00
- Grounding rod 3/4 batang 4.00 2,266,880.00 9,067,520.00
- Grouding Panel (JB)
- BC 2 x 120 mm2 meter 51.00 608,608.00 31,039,008.00
- Grounding rod 3/4 batang 4.00 2,266,880.00 9,067,520.00
- Junction Box Grounding ke Genset, Travo
- BC 35 mm2 meter 30.00 91,168.00 2,735,040.00
- Grounding rod 3/4 batang 4.00 2,266,880.00 9,067,520.00
- Junction Box Grounding ke LVMDP
- BC 120 mm2 meter 20.00 304,304.00 6,086,080.00
- Grounding rod 3/4 batang 4.00 2,266,880.00 9,067,520.00
- Junction Box Grounding unit 1.00 2,580,270.00 2,580,270.00
Jumlah 939,649,458.55

b Pemasangan kabel-kabel

1 Kabel dari PLN ke Panel TM, Primer Trafo, Sekunder Trafo, Genset, MDP ke masing - masing panel (Air Baku, Air bersih, Blower, Dosing, Panel Penerangan, Genset )

- Dari meter PLN ke Panel TM (cubicle)


- Kabel XLPE 1 x 70 mm2 12/20/kV m 1,300.00 31,680.00 41,184,000.00
- Terminating kabel XLPE, 70 mm2 set 6.00 1,211,490.72 7,268,944.32
- Dari meter Panel TM (cubicle) ke primer trafo
- Kabel XLPE 1 x 70 mm2 12/20/kV m 30.00 31,680.00 950,400.00
- Terminating kabel XLPE, 70 mm2 set 6.00 1,211,490.72 7,268,944.32
- Dari Sekunder trafo ke Panel MDP
- Kabel NYY 1 x 500 mm2 m 80.00 31,680.00 2,534,400.00
- Dari Generator 2x625 kVA ke Panel MDP
- Kabel NYY 1 x 300 mm2 m 120.00 31,680.00 3,801,600.00
- Kabel NYY 1 x 500 mm2 m 40.00 31,680.00 1,267,200.00
- Kabel NYA 1 x 120 mm2 m 30.00 31,680.00 950,400.00
- Dari Panel MDP ke panel PC-ABK (Air Baku)
- Kabel NYFGbY 4 x 300 mm2 m 80.00 31,680.00 2,534,400.00
- Kabel NYA 1 x 120 mm2 m 80.00 31,680.00 2,534,400.00
- Kabel NYFGbY 4 x 95 mm2 m 80.00 31,680.00 2,534,400.00
- Kabel NYA 1 x 70 mm2 m 80.00 31,680.00 2,534,400.00
- Dari MDP ke Panel TB-G (terminal Box Grounding)
- Kabel NYA 1 x 120 mm2 m 9.00 31,680.00 285,120.00
- Dari panel TB-G ke box control
- Kabel NYA 1 x 120 mm2 m 24.00 31,680.00 760,320.00
2 Kabel daya ke sub panel / panel penerangan
- Dari Panel MDP ke panel PP-RL
- Kabel NYY 4 x 4 mm2 m 7.00 31,680.00 221,760.00
- Kabel NYA 1 x 6 mm2 m 7.00 31,680.00 221,760.00
- Dari Panel M-PK ke panel PP-RJ (PP Ruang Jaga)
- Kabel NYFGbY 3 x 4 mm2 m 40.00 31,680.00 1,267,200.00
- Dari Panel M-PK ke panel PP-RK
- Kabel NYY 4 x 4 mm2 m 25.00 31,680.00 792,000.00
- Kabel NYA 1 x 6 mm2 m 25.00 31,680.00 792,000.00
- Dari Panel M-PK ke panel PP-KR
- Kabel NYY 4 x 6 mm2 m 20.00 31,680.00 633,600.00
- Kabel NYA 1 x 6 mm2 m 20.00 31,680.00 633,600.00
- Dari Panel PC-ABK ke panel PP-ABK
- Kabel NYY 4 x 4 mm2 m 7.00 31,680.00 221,760.00
- Kabel NYA 1 x 6 mm2 m 7.00 31,680.00 221,760.00
- Dari Panel F-FL ke panel PP - RL2
- Kabel NYY 4 x 6 mm2 m 7.00 31,680.00 221,760.00
- Kabel NYA 1 x 6 mm2 m 7.00 31,680.00 221,760.00
- Dari Panel M-FL ke panel PP-FL
- Kabel NYY 4 x 6 mm2 m 7.00 31,680.00 221,760.00
- Kabel NYA 1 x 6 mm2 m 7.00 31,680.00 221,760.00
- Dari Panel M-FL ke Panel PC-BWR
- Kabel NYY 4 x 4 mm2 m 150.00 31,680.00 4,752,000.00
- Kabel NYA 1 x 6 mm2 m 40.00 31,680.00 1,267,200.00
- Dari panel M-FL ke panel MOBV filter
- Kabel NYY 4 x 2.5 mm2 m 150.00 31,680.00 4,752,000.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Dari Panel M-FL ke panel PC-BWR
- Kabel NYFGbY 4 x 25 mm2 m 80.00 31,680.00 2,534,400.00
- Kabel NYA 1 x 25 mm2 m 80.00 31,680.00 2,534,400.00
- Dari Panel PC-BWR ke panel PP-BWR
- Kabel NYY 3x4 mm2 m 7.00 31,680.00 221,760.00
- Kabel NYA 1 x 6 mm2 m 7.00 31,680.00 221,760.00
- Dari Panel PC-BW ke panel PP-BW
- Kabel NYY 4 x 4 mm2 m 7.00 31,680.00 221,760.00
- Kabel NYA 1 x 6 mm2 m 7.00 31,680.00 221,760.00
- Dari Panel PC-AB ke panel PP-LR3
- Kabel NYFGbY 4 x 6 mm2 m 15.00 31,680.00 475,200.00
- Kabel NYA 1 x 6 mm2 m 15.00 31,680.00 475,200.00
- Dari panel PP - LR3 ke panel PP-PJ
- Kabel NYY 4 x 4 mm2 m 7.00 31,680.00 221,760.00
- Dari Panel PC-AB ke panel PP-AB
- Kabel NYY 4 x 4 mm2 m 7.00 31,680.00 221,760.00
- Kabel NYA 1 x 6 mm2 m 7.00 31,680.00 221,760.00
- Dari Panel PC-ABK ke panel PP-LR1
- Kabel NYFGbY 4 x 6 mm2 m 15.00 31,680.00 475,200.00
- Kabel NYA 1 x 6 mm2 m 15.00 31,680.00 475,200.00

2 Kabel daya dan kontrol dari masing - masing panel kontrol ke masing - masing motor, ukuran kabel sesuai dengan spesifikasi masing - masing motor

- Dari Panel PC -AB ke terminal motor, pompa Air Bersih


- Kabel NYY 3 x 70 mm2 m 120.00 31,680.00 3,801,600.00
- Kabel NYA 1 x 70 mm2 m 60.00 31,680.00 1,900,800.00
- Dari Panel PC-ABK ke LCP-ABK 1/2/3
- Kabel NYY 3 x 2.5 mm2 m 66.00 31,680.00 2,090,880.00
Jumlah 109,387,808.64

c Pengadaan Lampu Penerangan Luar


1 Dari panel PP-LR1
- Lampu LED 56W with aluminium housing, termasuk MCB dan trafo, IP 65 set 17.00 2,464,000.00 41,888,000.00
- Tiang lampu hot dip galvanis 6 m set 17.00 2,200,000.00 37,400,000.00
- Kabel NYFGbY 3 x 4 mm2 m 15.00 26,950.00 404,250.00
- Kabel NYFGbY 3 x 2,5 mm2 m 185.00 18,700.00 3,459,500.00
- Kabel NYFGbY 2 x 2,5 mm2 m 100.00 15,950.00 1,595,000.00
- GIP 2" m 6.00 123,200.00 739,200.00
2 Dari panel PP-LR2
- Lampu LED 56W with aluminium housing, termasuk MCB dan trafo, IP 65 set 17.00 2,464,000.00 41,888,000.00
- Tiang lampu hot dip galvanis 6 m set 17.00 2,200,000.00 37,400,000.00
- Kabel NYFGbY 4 x 4 mm2 m 30.00 31,900.00 957,000.00
- Kabel NYFGbY 3 x 4 mm2 m 50.00 26,950.00 1,347,500.00
- Kabel NYFGbY 3 x 2,5 mm2 m 50.00 18,700.00 935,000.00
- Kabel NYFGbY 4 x 2,5 mm2 m 60.00 22,000.00 1,320,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 40.00 15,950.00 638,000.00
3 Dari panel PP-LR3
- Lampu LED 56W with aluminium housing, termasuk MCB dan trafo, IP 65 set 17.00 2,464,000.00 41,888,000.00
- Kabel NYFGbY 3 x 2,5 mm2 m 150.00 18,700.00 2,805,000.00

Kabel NYFGbY 4 x 4 mm2 m 50.00 31,900.00


- 1,595,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 220.00 15,950.00 3,509,000.00
- 5. GIP 2" m 6.00 123,200.00 739,200.00
- Tiang lampu hot dip galvanis 6 m set 8.00 2,200,000.00 17,600,000.00
Jumlah 238,107,650.00

d Pemasangan Lampu Penerangan Luar


1 Dari panel PP-LR1
- Lampu LED 56W with aluminium housing, termasuk MCB dan trafo, IP 65 Tia set 17.00 807,660.48 13,730,228.16
- Kabel NYFGbY 3 x 4 mm2 m 15.00 30,800.00 462,000.00
- Kabel NYFGbY 3 x 2,5 mm2 m 185.00 30,800.00 5,698,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 100.00 30,800.00 3,080,000.00
2 Dari panel PP-LR2
- Lampu LED 56W with aluminium housing, termasuk MCB dan trafo, IP 65 Tia set 17.00 807,660.48 13,730,228.16
- Kabel NYFGbY 4 x 4 mm2 m 30.00 30,800.00 924,000.00
- Kabel NYFGbY 3 x 4 mm2 m 50.00 30,800.00 1,540,000.00
- Kabel NYFGbY 3 x 2,5 mm2 m 50.00 30,800.00 1,540,000.00
- Kabel NYFGbY 4 x 2,5 mm2 m 60.00 30,800.00 1,848,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 40.00 30,800.00 1,232,000.00
3 Dari panel PP-LR3
- Lampu LED 56W with aluminium housing, termasuk MCB dan trafo, IP 65 set 17.00 807,660.48 13,730,228.16
- Kabel NYFGbY 3 x 2,5 mm2 m 150.00 30,800.00 4,620,000.00
- Kabel NYFGbY 4 x 4 mm2 m 50.00 30,800.00 1,540,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 220.00 30,800.00 6,776,000.00
Jumlah 70,450,684.48
-
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
4 Pengadaan dan Pemasangan Instrumentasi dan Sistem Otomasi
1 Prasedimentasi
- Elektromagnetik Flowmeter dengan Akurasi 0.35 % dari pembacaan, Output 4 - unit 3.00 41,150,560.00 123,451,680.00
- Turbidity Analyzer Output 4 - 20 mA, Bahasa komunikasi Hartcomm, 0-10000 ntunit 1.00 92,883,340.00 92,883,340.00
- Pressure Transmitter dengan Akurasi 0.065 % dari Spann, Output 4 - 20 mA, B unit 1.00 9,109,320.00 9,109,320.00
- Water level Sensor, Tipe Ultrasonic, Akurasi 0.2 % dari Range ukur, Output 4 unit - 20,903,850.00 -
- 8 Core Singlemode Outdoor Direct Buried, Double Jacket 9/125um m 250.00 17,325.00 4,331,250.00
- Fibre optic splitter set 12.00 687,500.00 8,250,000.00
- Patchcord Duplex Singlemode 9um/125um, 3 meter (LSZH) set 12.00 165,000.00 1,980,000.00
- Network cable UTP Cat5 m 80.00 10,802.36 864,189.04
- Pigtail ST Singlemode, 1 meter set 10.00 18,150.00 181,500.00
- 8-port 10/100/1000 Managed Gigabit Switch with WebView set 4.00 3,888,500.00 15,554,000.00
- Cable tray 200x50x2400x1.2mm dan penutup set 80.00 290,950.00 23,276,000.00
- Digital pH Meter, Output 4 - 20 mA, Bahasa komunikasi Hartcomm, support out bh 1.00 17,108,300.00 17,108,300.00
2 Sistem Otomasi

Hardware support Redundancy system, meliputi Base Modul, AI/AO, DI/DO


- sesuai system konfigurasi dan I/O, Server, Workstation, Comm Modem, set 1.00 464,900,000.00 464,900,000.00
Printer, Panel and Marshalling cabinet dan accessories

Stardom Software media, HMI software and other support software, Auto
- set 1.00 313,466,000.00 313,466,000.00
Backup
Engineering dan Generation for FCX function, MMI Display and MMI
- set 1.00 228,866,000.00 228,866,000.00
Operator Utility Function (Estimate graphi Panel 10 pages)
- Pemasangan dan supporting material set 1.00 171,058,250.00 171,058,250.00
FAT, SAT, Uji komisioning Sistem Otomasi, gambar, buku manual OP,
- set 1.00 415,466,000.00 415,466,000.00
pelatihan operator
Jumlah 1,890,745,829.04

f Beton Dudukan Tangki Hydrophore


1 Pek. Galian Tanah m3 116.86 - -
2 Pek. Urugan Pasir m3 0.79 - -
3 Pek. Beton K125 (beton lantai kerja) m3 0.74 - -
4 Pek. Buis Beton Ø 100 cm bh 2.00 - -
5 Pek. Beton Cycloop m3 1.57 - -
6 Pek Beton K225 (Beton Trush Block) m3 61.00 - -
7 Pek. Beton K300 m3 7.75 - -
8 Pek. Begesting 2x Pakai m2 20.74 - -
9 Pek. Pembesian kg 558.97 - -
10 Pek. Angker Baut M16 bh 8.00 30,000.00 240,000.00
Jumlah 240,000.00

g Pengadaan Hydrophore
1 Pengadaan Perpipaan Hydrophore
- Ø 500 mm Steel pipe SCH 40 unit 17.00 2,132,223.60 36,247,801.20
- Ø 700 mm x Ø 500 mm Steel Reducer flange - flange unit 1.00 4,022,356.00 4,022,356.00
- Ø 700 mm x Ø 700 Tee y flange - flange unit 1.00 6,337,500.00 6,337,500.00
- Ø 500 mm x 90° Steel Bend flange - flange unit 6.00 6,099,145.00 36,594,870.00
- Ø 500 mm x 45° Steel Bend flange - flange unit 1.00 7,339,800.00 7,339,800.00
- Gate Valve Ø 500 mm Resellient seat lengkap dengan floor unit 2.00 65,723,609.90 131,447,219.80
- Ø 500 mm Flange las unit 10.00 4,022,356.00 40,223,560.00
- Ø 500 mm Karet Packing unit 8.00 50,804.00 406,432.00
- M30 Baud mur set 160.00 60,316.10 9,650,576.00
- Ø 100 mm Steel pipe SCH 40 m' 40.00 841,491.85 33,659,673.84
- Check Valve Ø 100 mm unit 2.00 4,680,000.00 9,360,000.00
- Realase Valve Ø 75 mm unit 2.00 2,860,000.00 5,720,000.00
- Manometer Scala 0 - 15 Kg/cm2 unit 2.00 236,496.00 472,992.00
2 Pengadaan Tangki Hydrophore
Tangki HydrophoreKapasitas L 10 m3, Tekanan 16kg/cm2, dilengkapi
- set 2.00 200,850,000.00 401,700,000.00
dengan membran dan kompressor.
Jumlah 723,182,780.84
h Pemasangan Hydrophore
1 Pemasangan Perpipaan Hydrophore
- Ø 500 mm Steel pipe SCH 40 unit 17.00 39,192.89 666,279.20
- Ø 700 mm x Ø 500 mm Steel Reducer flange - flange unit 1.00 267,488.00 267,488.00
- Ø 700 mm x Ø 700 Tee y flange - flange unit 1.00 584,512.50 584,512.50
- Ø 500 mm x 90° Steel Bend flange - flange unit 6.00 133,900.00 803,400.00
- Ø 500 mm x 45° Steel Bend flange - flange unit 1.00 133,900.00 133,900.00
- Gate Valve Ø 500 mm Resellient seat lengkap dengan floor unit 2.00 273,201.50 546,403.00
- Ø 500 mm Flange las unit 10.00 370,262.75 3,702,627.50
- Ø 500 mm Karet Packing unit 8.00 1,845.59 14,764.75
- M30 Baud mur set 160.00 1,054.63 168,740.00
- Ø 100 mm Steel pipe SCH 40 m' 40.00 7,161.77 286,470.60
- Check Valve Ø 100 mm unit 2.00 101,400.00 202,800.00
- Realase Valve Ø 75 mm unit 2.00 101,400.00 202,800.00
- Manometer Scala 0 - 15 Kg/cm2 unit 2.00 6,719.10 13,438.20
2 Pemasangan Tangki Hydrophore
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
Tangki HydrophoreKapasitas L 10 m3, Tekanan 16kg/cm2, dilengkapi
- set 2.00 393,000.00
dengan membran dan kompressor. 786,000.00
Jumlah 8,379,623.75

D PEKERJAAN PERALATAN KANTOR, LAB DAN WORKSHOP 104,820,980.00


1 Pengadaan AC dan APAR
- Air Condition Unit 2 PK Ruang Kendali Operasional unit 4.00 9,746,000.00 38,984,000.00
- Air Condition Unit 1 PK R. Kepala Kantor unit 1.00 4,708,000.00 4,708,000.00
- Air Condition Unit 1.5 PK unit 1.00 5,445,000.00 5,445,000.00
- Air Condition Unit 1 PK ex. Daikin u/ R.Staf unit 1.00 4,708,000.00 4,708,000.00
- Air Condition Unit 1 PK ex. Daikin u/ R.Staf unit 5.00 4,708,000.00 23,540,000.00
- Air Condition Unit 2 PK ex. Daikin u/ R.Lobby unit 1.00 9,746,000.00 9,746,000.00
- Air Condition Unit 3/4 PK ex. Daikin Class unit 2.00 4,455,000.00 8,910,000.00
Jumlah 96,041,000.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
2 Pemasangan AC dan APAR
- Air Condition Unit 2 PK Ruang Kendali Operasional unit 1.00 1,100,000.00 1,100,000.00
- Air Condition Unit 2 PK Ruang Kendali Operasional unit 3.00 242,220.00 726,660.00
- Air Condition Unit 1 PK R. Kepala Kantor unit 1.00 1,100,000.00 1,100,000.00
- Air Condition Unit 1.5 PK unit 1.00 1,100,000.00 1,100,000.00
- Air Condition Unit 1 PK ex. Daikin u/ R.Staf unit 1.00 1,100,000.00 1,100,000.00
- Air Condition Unit 1 PK ex. Daikin u/ R.Staf unit 5.00 242,220.00 1,211,100.00
- Air Condition Unit 2 PK ex. Daikin u/ R.Lobby unit 1.00 1,100,000.00 1,100,000.00
- Air Condition Unit 3/4 PK ex. Daikin Class unit 1.00 1,100,000.00 1,100,000.00
- Air Condition Unit 3/4 PK ex. Daikin Class unit 1.00 242,220.00 242,220.00
Jumlah 8,779,980.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6

PEKERJAAN IPA KAPASITAS 185 LT/DT


A PEKERJAAN PERSIAPAN DAN UMUM 1,000,000.00
I Persiapan dan Pekerjaan Sementara

Mobilisasi semua alat berat, mesin - mesin, peralatan dan tenaga ahli
1 Unit 1.00 - -
yang diperlukan untuk pelaksanaan pekerjaan

Bangunan kantor kontraktor, workshop, gudang, tempat tinggal staf


dan tenaga kerja, serta fasilitas/bangunan lainnya termasuk furniture,
2 Unit 1.00 - -
penerangan, AC dan tempat parkir yang diperlukan untuk pelaksanaan
pekerjaan.

3 Papan nama proyek bh 1.00 1,000,000.00 1,000,000.00

II Survey dan penyelidikan bawah tanah


1 Test pit ttk 10.00 - -
2 Penyediaan lokasi pembuangan hasil galian ls 1.00 - -

3 Pembersihan semua fasilitas sementara, Pemindahan mesin/peralatan, ls 1.00 - -


material sisa dan sebagainya
JUMLAH
1,000,000.00

B PEKERJAAN BANGUNAN SIPIL ###

- PEKERJAAN BANGUNAN IPA KAPASITAS 185 LT/DT #REF!


1 PEKERJAAN TANAH LUAS
1 Pengukuran dan Pasang Bowplank m' 132.70 - -
2 Galian Tanah dengan Excavator m3 40.06 - -
3 Urugan Tanah Kembali dengan Pemadatan m3 577.99 - -
4 Urugan Pasir m3 82.62 - -
Jumlah -

2 PEKERJAAN STRUKTUR ATAU SIPIL DAN ASITEKTUR


a Pekerjaan Pasangan dan Beton
1 Pekerjaan Pasangan Batu Kosong m3 4.45 - -
2 Pekerjaan Pasangan Batu Kali Campuran 1 : 4 m3 7.71 - -
3 Lantai Kerja K 125 m3 30.96 - -
4 Pekerjaan Beton Bor Pile -
- Galian Tanah dengan Bor m' 200.00 #REF! #REF!
- Beton K 300 m3 25.13 - -
- Pembesian kg 3,746.18 - -
5 Pekerjaan Beton Pondasi Plat Kaki -
- Beton K 300 m3 7.94 - -
- Pembesian kg 5,521.48 - -
- Begesting Batako m2 31.20 - -
6 Pekerjaan Beton Sloop
- Beton K 300 m3 6.18 - -
- Pembesian kg 848.18 - -
- Begesting 2x Pakai m2 41.20 - -
7 Pekerjaan Beton Standing Colum -
- Beton K 300 m3 3.68 - -
- Pembesian kg 839.09 - -
- Begesting 2x Pakai m2 21.00 - -
8 Pekerjaan Beton Lantai -
- Beton K 300 m3 287.93 - -
- Pembesian kg 55,829.00 - -
9 Pekerjaan Beton Dinding, Gutter, dan Plat Jalan Setapak
- Beton K 300 m3 839.30 - -
- Pembesian kg 100,032.99 - -
- Begesting 2x Pakai m2 4,883.65 - -
- Tie Rot m' 1,306.00 68,500.00 89,461,000.00
- Water Sttop W 300 mm m' 1,801.67 - -
10 Pekerjaan Beton Balok -
- Beton K 300 m3 42.47 - -
- Pembesian kg 7,022.79 - -
- Begesting 2x Pakai m2 406.25 - -
11 Pekerjaan Beton Colum -
- Beton K 300 m3 76.27 - -
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Pembesian kg 22,358.04 - -
- Begesting 2x Pakai m2 996.58 - -
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
12 Pekerjaan Beton Plat Atap -
- Beton K 300 m3 55.76 - -
- Pembesian kg 10,895.18 - -
- Begesting 1x Pakai m2 361.57 - -
13 Pekerjaan Beton Plat Nozel Pekerjaan Acian Dindin
- Beton K 300 m3 14.51 - -
- Pembesian kg 3,861.37 - -
- Begesting 1x Pakai m2 96.72 - -
14 Pekerjaan Beton Tangga
- Beton K 300 m3 7.69 - -
- Pembesian kg 2,243.89 - -
- Begesting 1x Pakai m2 59.66 - -
- Begesting Batako m2 3.72 - -
15 Pekerjaan Beton Saluran
- Beton K 300 m3 75.94 - -
- Pembesian kg 6,969.96 - -
- Begesting 1x Pakai m2 669.06 - -
16 Pekerjaan Dudukan Pipa dan Pompa
- Beton K 300 m3 0.39 - -
- Pembesian kg 182.44 - -
- Begesting 2x Pakai m2 4.68 - -
17 Pekerjaan Pasangan Bata 1 : 4 m2 271.51 - -
18 Pekerjaan Plesteran m2 554.56 - -
19 Pek. Acian m2 1,158.07 - -
Jumlah #REF!
b Pekerjaan Rangka Baja dan Atap
1 Pekerjaan Rangka Atap Baja WF kg 8,447.39 - -
2 Pek. Rangka Atap Baja Ringan m2 119.70 190,000.00 22,743,000.00
3 Pekerjaan Gording Canal kg 2,332.84 - -
4 Pek. Sagrood Ø 12mm kg 18.00 - -
5 Pek. Track Stang Ø 12mm kg 58.83 - -
6 Pek. Plat Baja kg 114.11 - -
7 Pek. Baut Mur 16mm m2 352.00 - -
8 Pek. Baut Angker M22, L = 60 cm m' 176.00 - -
9 Pek. Atap Spandek 0.3mm m 273.81 Err:509 Err:509
10 Pek. Bubungan Spandek bh 30.30 Err:509 Err:509
11 Pek. Atap Genteng m2 127.15 - -
12 Pek. Bubungan Genteng m' 31.35 - -
13 Pekerjaan Pasang Lisplank m' 91.94 - -
14 Pek. Tatab m' 46.60 - -
15 Pek. Murda bh 2.00 - -
16 Pek. Ikut Celedu bh 4.00 - -
Jumlah Err:509

c Pekerjaan Kusen Pintu dan Jendela


1 Pekerjaan Kusen Pintu dan Jendela Aluminium m 76.320 - -
2 Pekerjaan Daun Pintu Aluminium m2 3.780 - -
3 Pekerjaan Daun Jendela Aluminium Panil Kaca m2 17.744 - -
4 Pekerjaan Kusen Pintu Besi Profil C NP m 7.00 - -
5 Pekerjaan Daun Pintu Besi rangka L 50.50.5 m2 3.99 - -
6 Pasang Engsel Pintu baja As 1" pasang 3.00 - -
7 Pasang Kunci Pintu Baja pasang 1.00 - -
8 Pasang Grendel Tanam untuk Pintu baja Set 2.00 - -
9 Pasang Engsel Pintu pasang 4.000 - -
10 Pasang Kunci Pintu pasang 2.000 - -
11 Pasang Grendel Pintu pasang 2.000 - -
12 Pasang Engsel Jendela pasang 48.000 - -
13 Pasang Grendel Jendela pasang 12.000 - -
14 Pasang Kait Angin pasang 24.000 - -
15 Pekerjaan Penutup Man Hole Plat Besi T=1,2 mm bh 2.00 Err:509 Err:509
16 Pekerjaan Grill Penutup Besi Strip 30x3 mm m2 30.40 1,087,936.03 33,073,255.16
17 Pekerjaan Railing m' 383.73 Err:509 Err:509
Jumlah Err:509
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
d Pekerjaan Finishing
1 Pekerjaan Pengecatan Dinding m2 306.875 - -
2 Pekerjaan Politur Lisplank m2 13.79 - -
3 Pekerjaan Pengecatan Rangka Baja m2 115.74 - -
4 Meni dan Cat Besi m2 7.98 - -
5 Ornamen Ukir Style Bali m2 15.24 3,129,740.63 47,697,247.13
6 Pekerjaan Waterproofing m2 3,913.61 - -
7 Pekerjaan Pasangan Keramik Lantai m2 53.71 - -
8 Pekerjaan Lapis Keramik pada Gutter m2 221.79 - -
Jumlah 47,697,247.13

- PEKERJAAN BANGUNAN PENGELOLA Err:509


1 PEKERJAAN TANAH LUAS
1 Galian Tanah dengan excavator m3 43.66 - -
2 Pengukuran dan Bouwplank m' 327.44 - -
3 Urugan Tanah Kembali dengan Pemadatan m3 191.54 - -
4 Urugan Pasir t = 10 cm m3 15.64 - -
Jumlah -
2 PEKERJAAN STRUKTUR ATAU SIPIL DAN ASITEKTUR
a Pekerjaan Beton
1 Pekerjaan Beton Rabat K125 m3 4.73 - -
2 Pekerjaan Beton Pondasi Plat Kaki R. Pengelola
- Beton Cor K-225 m3 8.06 - -
- Pekerjaan Besi Beton Kg 1,033.02 - -
- Pekerjaan Begesting 2 X pakai m2 26.88 - -
3 Beton Kolom Lt 1 R. Pengelola
- Beton Cor K-225 m3 8.62 - -
- Pekerjaan Besi Beton Kg 1,822.37 - -
- Pekerjaan Begesting 2 X pakai m2 114.91 - -
4 Balok Sloof ( S1 dan SP ) R. Pengelola ###
- Beton Cor K-225 m3 6.21 - -
- Pekerjaan Besi Beton Kg 1,693.73 - -
- Pekerjaan Begesting 2 X pakai m2 50.76 - -
5 Balok Lantai 1 ( B1 & TP ) R.Pengelola
- Beton Cor K-225 m3 6.36 - -
- Pekerjaan Besi Beton Kg 2,057.17 - -
- Pekerjaan Begesting 2 X pakai m2 76.67 - -
6 Beton Balok Lt.2 R. Pengelola
- Beton Cor K-225 m3 5.63 - -
- Pekerjaan Besi Beton Kg 1,153.03 - -
- Pekerjaan Begesting 2 X pakai m2 59.67 - -
7 Beton Plat Lantai 2 R. Pengelola
- Beton Cor K-225 m3 12.00 - -
- Pekerjaan Besi Beton Kg 1,542.18 - -
- Pekerjaan Begesting 2 X pakai m2 100.00 - -
8 Beton Plat Lantai 2 R. Pengelola ( T10-01)
- Beton Cor K-225 m3 6.31 - -
- Pekerjaan Besi Beton Kg 606.63 - -
- Pekerjaan Begesting 2 X pakai m2 91.08 - -
9 Beton Tangga R. Pengelola
- Beton Cor K-225 m3 2.63 - -
- Pekerjaan Besi Beton Kg 762.98 - -
- Pekerjaan Begesting 2 X pakai m2 20.78 - -
10 Beton Kolom Lt 2 R. Pengelola
- Beton Cor K-225 m3 6.44 - -
- Pekerjaan Besi Beton Kg 1,367.89 - -
- Pekerjaan Begesting 2 X pakai m2 85.85 - -
11 Beton Ring Balok R. Pengelola
- Beton Cor K-225 m3 2.89 - -
- Pekerjaan Besi Beton Kg 642.62 - -
- Pekerjaan Begesting 2 X pakai m2 31.35 - -
12 Beton Kolom Praktis R. Pengelola
- Beton Cor K-225 m3 0.81 - -
- Pekerjaan Besi Beton Kg 267.29 - -
- Pekerjaan Begesting 2 X pakai m2 21.56 - -
13 Beton Ring Balok Praktis
- Beton Cor K-225 m3 4.32 - -
- Pekerjaan Besi Beton Kg 215.80 - -
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Pekerjaan Begesting 2 X pakai m2 19.80 - -
Jumlah -
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
b Pekerjaan Pasangan dan Dinding
1 Pekerjaan Dinding Pasangan Bata 1:4 m2 272.67 - -
2 Pekerjaan Dinding Pasangan Bata 1:2 m2 39.10 - -
3 Pekerjaan Plesteran 1:4 m2 545.34 - -
4 Pekerjaan Plesteran 1:2 m2 78.20 - -
5 Pekerjaan Acian Dinding m2 623.54 - -
6 Pekerjaan Pas. Keramik Lantai 40 x 40 m2 157.56 - -
7 Pekerjaan lantai keramik stepnozing m1 24.50 - -
8 Pek. Pasangan Batu Paras Sangsit m2 105.40 - -
9 Ornamen ukir style bali m2 13.93 - -
10 Pekerjaan Pasangan Batu Kosong m3 14.04 - -
11 Pekerjaan Pondasi Batu Kali m3 45.59 - -
12 Pekerjaan Pas. Keramik dinding 20 x 60 m2 33.13 - -
13 Pek. Pas Keramik Lantai 30 x 30 Cm m2 6.56 - -
14 Pekerjaan Pas. Keramik plin 10 x 40 m1 110.46 - -
15 Pekerjaan Pasangan Pepalihan Style Bali m2 219.86 - -
Jumlah -

c Pekerjaan Kusen, Pintu dan Jendela


1 Pekerjaan Kusen Pintu dan Jendela Aluminium m 203.00 - -
2 Pekerjaan Kusen Pintu Kayu Kamfer m³ 5.65 - -
3 Talang air hujan m 17.18 - -
4 Daun Pintu bingkai Allumunium m2 14.81 - -
5 Daun Pintu Kamfer m2 2.57 - -
6 Jendela Kaca Bingkai Alumunium m2 42.04 - -
7 Pasang Engsel Pintu pasang 20.00 - -
8 Pasang Engsel Jendela pasang 32.00 - -
9 Pasang Kunci Pintu pasang 8.00 - -
10 Pasang Grendel Jendela pasang 32.00 - -
11 Pasang Kait Angin pasang 32.00 - -
Jumlah -

d Pekerjaan Atap dan Plafond


1 Pekerjaan Kap Baja Ringan m2 80.30 175,000.00 14,052,937.50
2 Pasang Atap Genteng Keramik glasur m2 152.49 - -
3 Pasang Genteng Bubungan Keramik glasur m 45.81 - -
4 Pek. Pasang Listplank Kayu kanfer Profil m 72.80 - -
5 Murda Paras Ukir unit 3.00 - -
6 Ikut Celedu Paras Ukir unit 8.00 - -
7 Pekerjaan Plafond Gypsum Rangka Hollow m2 135.38 - -
8 Pekerjaan list Plafond m 152.78 - -
9 Pekerjaan Railing Tangga dan Balkon (Stainless Steel) m 8.87 Err:509 Err:509
10 Pek. Lambesering m2 72.21 - -
11 Pek. List Plafond Lambesering m 67.12 - -
Jumlah Err:509

e Pekerjaan Finishing
1 Pekerjaan Pengecatan Dinding Luar m2 201.79 - -
2 Pekerjaan Pengecatan Dinding Dalam m2 478.79 - -
3 Pekerjaan Pengecatan Plafond m2 135.38 - -
4 Pekerjaan Polituran Listplank m2 73.33 - -
5 Pekerjaan Pengecatan Rangka Baja m2 343.60 - -
6 Pekerjaan Polituran Lambesering m2 72.21 - -
Jumlah -
f Pekerjaan Toilet
1 Instalasi Plumbing Air Bersih m 25.00 42,900.00 1,072,500.00
2 Instalasi Plumbing Air Kotor m 36.00 231,170.50 8,322,138.00
3 Closet duduk bh 2.00 - -
4 Pasang Washtafel set 2.00 - -
5 Pasang Floor Drain set 2.00 - -
6 Pasang Kran air set 4.00 - -
Jumlah 9,394,638.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6

- PEKERJAAN BANGUNAN KIMIA DAN CHLORINE 60,389,226.87


1 PEKERJAAN TANAH ###
1 Pengukuran dan Pasang Bowplank m' 66.20 - -
2 Galian Tanah dengan Excavator m3 91.79 - -
3 Urugan Tanah Kembali dengan Pemadatan m3 27.59 - -
4 Urugan Pasir m3 11.65 - -
Jumlah -

2 PEKERJAAN STRUKTUR ATAU SIPIL DAN ASITEKTUR


a Pekerjaan Beton
1 Lantai Kerja K 125 ( 1 pc : 3 ps : 5 Kr) m3 7.40 - -
2 Pondasi Beton Plat Kaki
- Beton K 300 m3 4.95 - -
- Pembesian kg 781.16 - -
- Begesting Batako m2 19.80 - -
3 Balok Dasar Sloof
- Beton K 300 m3 6.42 - -
- Pembesian kg 926.15 - -
- Begesting 2x Pakai m2 64.16 - -
4 Beton Kolom
- Beton K 300 m3 12.05 - -
- Pembesian kg 2,449.06 - -
- Begesting 2x Pakai m2 163.03 - -
5 Beton Balok
- Beton K 300 m3 16.52 - -
- Pembesian kg 3,246.20 - -
- Begesting 2x Pakai m2 177.67 - -
6 Plat Lantai
- Beton K 300 m3 7.25 - -
- Pembesian kg 1,225.38 - -
7 Plat Atap
- Beton K 300 m3 12.22 - -
- Pembesian kg 2,617.31 - -
- Begesting 1x Pakai m2 101.82 - -
8 Beton Dudukan Tabung dan Bak Pencampur
- Beton K 300 m3 4.42 - -
- Pembesian kg 804.74 - -
- Begesting 2x Pakai m2 56.51 - -
9 Beton Lisplank
- Beton K 300 m3 2.26 - -
- Pembesian kg 970.54 - -
- Begesting 2x Pakai m2 73.46 - -
Jumlah -

b Pekerjaan Pasangan dan Pelapis


1 Pekerjaan Pasangan Batu Kosong m3 16.98 - -
2 Pekerjaan Pasangan Batu Kali 1:4 m3 28.65 - -
3 Pekerjaan PasanganDinding Bata 1:2 m2 435.61 - -
4 Pekerjaan Plesteran Dinding 1:2 m2 37.35 - -
5 Pekerjaan Plesteran Dinding 1 PC : 5 Ps m2 833.88 - -
6 Pekerjaan Acian Dinding m2 833.88 - -
7 Pekerjaan Pasangan Keramik Lantai 40 x 40 cm m2 833.88 - -
8 Pek. Pasangan Batu Paras Sangsit m2 40.53 - -
9 Pekerjaan Lapisan Fiber Glass (2 x Lapis) m2 39.51 507,788.60 20,064,555.62
10 Pekerjaan Plafond Gypsum Rangka Hollow m2 206.66 - -
11 Pekerjaan list Plafond m 78.46 - -
12 Pekerjaan Pas. Keramik lantai 30 x 30 m2 70.45 - -
13 Pas. Keramik 20x30 cm m2 4.30 - -
14 Pek. Pasangan Keramik Dinding KM 20 x 25 Cm m2 17.43 - -
15 Pas. Stepnozing m' 8.30 - -
16 Pekerjaan Toilet
- Instalasi Plumbing Air Bersih m 20.00 42,900.00 858,000.00
- Instalasi Plumbing Air Kotor m 15.00 231,170.50 3,467,557.50
- Pasang Closet Duduk bh 1.00 - -
- Pasang Washtafel set 1.00 - -
- Pasang Floor Drain set 1.00 - -
- Pasang Kran air set 1.00 - -
- Pekerjaan Septick Tank dan peresapan unit 1.00 - -
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Pompa Air Bersih unit 1.00 3,850,000.00 3,850,000.00
Jumlah 28,240,113.12
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
c Pekerjaan Atap
1 Pekerjaan Atap Baja Ringan m2 167.96 190,000.00 31,912,400.00
2 Pekerjaan Pasangan Atap Genteng m2 115.60 - -
3 Pekerjaan Pas Bubungan m' 42.29 - -
4 Pekerjaan Pas. Ikut Celedu unit 4.00 - -
5 Pekerjaan Pas. Murda unit 2.00 - -
6 Pekerjaan Pas. Listplank m' 125.92 - -
7 Pekerjaan Pas. Tatab m' 63.40 - -
8 Pek. Cat Listplank m2 31.48 - -
Jumlah 31,912,400.00
d Pekerjaan Kusen, Pintu, Jendela dan Relling
1 Pekerjaan Kusen Pintu dan Jendela Aluminium m 20.480 - -
2 Pekerjaan Daun Pintu Aluminium m2 3.21 - -
3 Pekerjaan Daun Jendela Aluminium Panil Kaca m2 2.45 - -
4 Pekerjaan Kusen Kayu m3 0.02 - -
5 Pekerjaan Daun Jendela Jalusi m2 0.35 676,325.00 236,713.75
6 Pekerjaan Kusen Pintu Besi Profil C NP m 26.10 - -
7 Pekerjaan Daun Pintu Besi rangka L 50.50.5 m2 34.32 - -
8 Pasang Engsel Pintu pasang 2.00 - -
9 Pasang Engsel Jendela pasang 8.00 - -
10 Pasang Handle dan Kunci Pintu pasang 1.00 - -
11 Pasang Grendel Jendela pasang 4.00 - -
12 Pasang Kait Angin pasang 8.00 - -
13 Pasang Engsel Pintu baja As 1" pasang 12.00 - -
14 Pasang Kunci Pintu Baja pasang 2.00 - -
15 Pasang Grendel Tanam untuk Pintu baja Set 4.00 - -
Jumlah 236,713.75

e Pekerjaan Cat
1 Meni dan Cat Besi m2 68.64 - -
2 Plamur dan Cat Tembok m2 833.88 - -
3 Pekerjaan Pengecatan Plafond m2 206.66 - -
Jumlah -

- PEKERJAAN BANGUNAN GENSET Err:509


1 PEKERJAAN TANAH
1 Pengukuran dan Pasang Bowplank m' 50.65 - -
2 Galian Tanah dengan excavator m3 354.93 - -
3 Urugan Tanah Kembali dengan Pemadatan m3 224.44 - -
4 Urugan Pasir di bawah lantai m3 13.93 - -
5 Urugan Pasir di bawah Pondasi t = 10 cm m3 38.00 - -
Jumlah -

2 PEKERJAAN STRUKTUR ATAU SIPIL DAN ASITEKTUR


a Pekerjaan Pasangan dan Beton
1 Pekerjaan Pasangan Batu Kosong m3 8.40 - -
2 Pekerjaan Pasangan Pondasi Batu Kali m3 42.10 - -
3 Pekerjaan Beton Rabat
- Cor Beton K125 m3 7.01 - -
4 Pekerjaan Beton pondasi Plat kaki
- Beton Cor K-225 m3 5.83 - -
- besi Beton Kg 2,974.19 - -
- Begesting Pasangan Batako 1:5 m2 15.36 - -
5 Pekerjaan Beton Sloope
- Beton Cor K-225 m3 5.04 - -
- besi Beton Kg 1,126.08 - -
- Begesting 2 X pakai m2 33.60 - -
6 Pekerjaan Beton Kolom
- Beton Cor K-225 m3 8.33 - -
- besi Beton Kg 2,121.56 - -
- Begesting 2 X pakai m2 105.18 - -
7 Pekerjaan Beton Lantai Dan Pondasi Genset
- Beton Cor K-300 m3 16.49 - -
- besi Beton Kg 270.78 - -
8 Pekerjaan Beton Balok Atap
- Beton Cor K-225 m3 11.42 - -
- besi Beton Kg 1,964.15 - -
- Begesting 2 X pakai m2 80.86 - -
9 Pekerjaan Beton Plat Atap
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Beton Cor K-225 m3 15.01 - -
- besi Beton Kg 2,016.08 - -
- Begesting 1 X pakai m2 124.82 - -
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
10 Pekerjaan Beton Listplank
- Beton Cor K-225 m3 3.10 - -
- besi Beton Kg 698.79 - -
- Begesting 2 X pakai m2 50.09 - -
11 Kolom Praktis dan Balok Latei
- Beton Cor K-225 m3 1.07 - -
- besi Beton Kg 224.43 - -
- Begesting 2 X pakai m2 21.38 - -
12 Pekerjaan Pasangan Dinding Bata 1 Pc : 4 Ps m3 197.50 - -
13 Pekerjaan Plesteran Dinding 1 Pc : 4 Ps m3 298.12 - -
14 Pekerjaan Acian Dinding m3 474.25 - -
15 Pekerjaan Water Proofing ( Atap ) m2 161.84 - -
16 Pekerjaan Beton Sloope, Ring Balk & Kolom Praktis m3 0.90 - -
17 Pekerjaan Pas. Keramik Lantai 30 x 30 m2 21.43 - -
Jumlah -

b Pekerjaan Kusen Pintu dan Jendela


1 Pekerjaan Kusen Pintu dan Jendela Aluminium m 21.16 - -
2 Pekerjaan Daun Jendela Jalusi m2 10.37 Err:509 Err:509
3 Pekerjaan Kusen Pintu Besi Profil C NP 140 x 60 x 7 mm m 29.63 - -
4 Pekerjaan Pintu Plat baja 2 sisi dalamnya Glass wool m2 13.68 - -
5 Pasang Engsel Pintu baja As 1" pasang 18.00 - -
6 Pasang Kunci Pintu Baja pasang 4.00 - -
7 Pasang Grendel Tanam untuk Pintu baja Set 4.00 - -
8 Talang Air Hujan m' 20.80 - -
9 Baut Angkur M22 Penjangkaran 1000 mm bh 10.00 - -
Jumlah Err:509

c Pekerjaan Finishing
1 Pekerjaan Pengecatan Dinding (Plamuur dan Cat Tembok) m2 437.28 - -
2 Pek. Pasangan Bata Paras Sangsit m2 25.90 - -
3 Pekerjaan Pasangan Pepalihan Style Bali (Batu Paras Sangsit) m2 90.12 - -
Jumlah -

- PEKERJAAN BANGUNAN IPAL Err:509


1 PEKERJAAN TANAH ###
1 Pengukuran dan Pasang Bowplank m' 83.20 - -
2 Galian Tanah dengan Excavator m3 171.55 - -
3 Urugan Pasir m3 282.10 - -
4 Kerikil Halus gradasi butiran Ø 0.3 - 1.75 Cm m3 44.32 220,327.80 9,765,478.92
5 Pasir Halus gradasi butiran Ø 0.4 - 0.7 mm m3 46.80 193,004.90 9,032,629.32
Jumlah 18,798,108.24

2 PEKERJAAN STRUKTUR ATAU SIPIL DAN ASITEKTUR


a Pekerjaan Beton
1 Lantai Kerja K 125 ( 1 pc : 3 ps : 5 Kr) m3 11.46 - -
2 Beton Plat Lantai
- Beton K 300 m3 65.09 - -
- Pembesian kg 7,777.05 - -
- Begesting 2x Pakai m2 27.49 - -
3 Pekerjaan Beton Dinding dan Saluran
- Beton K 300 m3 68.16 - -
- Pembesian kg 10,278.07 - -
- Begesting 2x Pakai m2 500.43 - -
Jumlah -
b PEKERJAAN LAIN LAIN ###
1 Pekerjaan Baja Profil I WF 250 X 125 X 5 mm Kg 807.47 - -
2 Pekerjaan Baja Profil I NP 60 Kg 177.24 - -
3 Pekerjaan Besi Plat Tebal 5 cm Kg 577.76 - -
4 Pekerjaan Grill Penutup Besi strip 30 x 3 mm m2 14.03 1,087,936.03 15,263,742.43
5 Pekerjaan Pintu Air Unit 5.00 271,984.01 1,359,920.05
6 Pekerjaan Pintu Air dari kayu ulin / besi lubang 400 x 300 mm unit 4.00 15,334,000.00 61,336,000.00
7 Pekerjaan waterproofing m2 288.66 - -
8 Baut Angkur M22 Penjangkaran 1000 mm bh 24.00 - -
9 Plat Andas 300 x 300 x 18 mm bh 6.00 Err:509 Err:509
10 Meni dan Cat Besi m2 41.58 - -
Jumlah Err:509
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6

- PEKERJAAN SIPIL RESERVOIR KAPASITAS 3600 M3 #REF!


1 PEKERJAAN TANAH
1 Pengukuran dan Pasang Bowplank m' 160.72 - -
2 Galian Tanah dengan excavator m3 1,527.30 - -
3 Urugan Tanah Kembali dengan Pemadatan m3 163.39 - -
4 Urugan Pasir t = 10 cm m3 100.66 - -
Jumlah -
2 PEKERJAAN STRUKTUR ATAU SIPIL DAN ASITEKTUR
a Pekerjaan Beton
1 Pekerjaan Pondasi Bor Pile
- Pembuatan lubang Bor Pile Ø 40 cm m 420.00 #REF! #REF!
- Beton Cor K-300 m3 52.75 - -
- besi Beton Kg 9,243.18 - -
2 Lantai Kerja K - 125 (1 PC : 3 PS : 5KR)
- Cor Beton Camp 1:3:5 m3 50.33 - -
3 Pekerjaan Beton pondasi Plat Setempat & Keliling
- Beton Cor K-300 m3 105.41 - -
- besi Beton Kg 39,177.49 - -
- Begesting Pasangan Batako m2 230.24 - -
4 Pekerjaan Sloof
- Beton Cor K-300 m3 46.98 - -
- Pekerjaan Besi Beton Kg 15,145.60 - -
- Begesting Pasangan Batako m2 313.20 - -
5 Pekerjaan Beton Lantai
- Beton Cor K-300 m3 247.14 - -
- besi Beton Kg 41,030.07 - -
6 Pekerjaan Beton Kolom
- Beton Cor K-300 m3 68.85 - -
- besi Beton Kg 15,896.45 - -
- Begesting 2 X pakai m2 635.06 - -
7 Pekerjaan Beton Dinding Basement
- Beton Cor K-300 m3 320.38 - -
- besi Beton Kg 34,908.46 - -
- Begesting 2 X pakai m2 2,135.88 - -
- Pekerjaan Tie Rod pada Bekisting Vertikal m1 1,669.60 68,500.00 114,367,600.00
8 Pekerjaan Beton Balok
- Beton Cor K-300 m3 68.99 - -
- besi Beton Kg 13,276.15 - -
- Begesting 2 X pakai m2 588.56 - -
9 Pekerjaan Beton Plat Atap
- Beton Cor K-300 m3 95.70 - -
- besi Beton Kg 18,810.82 - -
- Begesting 1 X pakai m2 793.73 - -
10 Pekerjaan Beton Listplang
- Beton Cor K-300 m3 8.44 - -
- besi Beton Kg 1,014.72 - -
- Begesting 2 X pakai m2 185.77 - -
11 Pekerjaan Tangga
- Beton Cor K-300 m3 3.31 - -
- besi Beton Kg 854.28 - -
- Begesting 2 X pakai m2 15.40 - -
12 Pekerjaan Dudukan Pompa dan Pipa
- Beton Cor K-300 m3 0.23 - -
- besi Beton Kg 255.93 - -
- Begesting 2 X pakai m2 6.96 - -
Jumlah #REF!
b Pekerjaan Pasangan dan Pelapis
1 Pekerjaan PasanganPondasi Batu Kali m3 2.20 - -
2 Pekerjaan Pas, Dinding Bata Merah 1 : 2 m2 559.44 - -
3 Pekerjaan Pas, Dinding Bata Merah 1 : 4 m2 55.92 - -
4 Pekerjaan Pas. Batako m2 402.90 - -
5 Pekerjaan Water Proofing m2 3,901.92 - -
6 Pekerjaan Water Stop m 960.05 - -
7 Pekerjaan Plesteran 1 PC : 2 Ps m2 1,118.88 - -
8 Pekerjaan Plesteran 1 PC : 4 Ps m2 142.20 - -
9 Pekerjaan Acian m2 371.10 - -
10 Pek. Pasangan Bata Paras Sangsit m2 32.87 - -
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
11 Meni dan cat besi m2 11.51 - -
Jumlah -

c Pekerjaan Kusen Pintu dan Relling


1 Pekerjaan Kusen Aluminium m' 27.50 - -
2 Pekerjaan Daun Pintu Panil m2 1.94 - -
3 Pekerjaan Jendela Jelusi m2 1.73 - -
4 Pas. Engsel Pintu bh 2.00 - -
5 Pasang Handle + Kunci Pintu bh 1.00 - -
6 Pekerjaan Kusen Pintu Baja Profil L 70.70.6 m2 11.20 - -
7 Pekerjaan Daun Pintu Besi rangka L 50.50.5 m2 11.51 - -
8 Pasang Engsel Pintu baja As 1" pasang 3.00 235,361.50 706,084.50
9 Pasang Kunci Pintu Baja set 1.00 225,000.00 225,000.00
10 Pasang Grendel Tanam untuk Pintu baja pasang 2.00 138,527.50 277,055.00
11 Pekerjaan Pipa Ventilasi GIP 4" Unit 7.00 750,000.00 5,250,000.00
12 Pekerjaan Penutup Man Hole Plat Besi T= 1.2 mm Unit 7.00 Err:509 Err:509
13 Pekerjaan Tangga Inspeksi Pipa GIP Unit 7.00 Err:509 Err:509
14 Railling Balkon dan Tangga (Pipa Black Steel) m' 31.68 Err:509 Err:509
Jumlah Err:509

- PEKERJAAN SIPIL BANGUNAN POS JAGA 16,468,338.00


1 Pekerjaan Tanah
1 Pengukuran dan Pasang Bowplank m' 36.80 - -
2 Galian Tanah dengan excavator m3 12.78 - -
3 Urugan Tanah Kembali dengan Pemadatan m3 7.99 - -
4 Urugan Pasir t = 10 cm m3 1.01 - -
1 Pek. Urugan Tanah Peninggian Lantai m3 5.77 - -
2 Pek. Urugan Pasir Lantai Kerja m3 1.07 - -
Jumlah -
2 PEKERJAAN STRUKTUR ATAU SIPIL DAN ASITEKTUR
3 PEKERJAAN BETON
1 Lantai Kerja K - 125
- Cor Beton K-125 m3 1.07 - -
2 Pekerjaan Sloof
- Beton Cor K-175 m3 1.69 - -
- Pekerjaan Besi Beton Kg 191.57 - -
- Begesting Pasangan Batako m2 16.90 - -
3 Pekerjaan Beton Kolom
- Beton Cor K-175 m3 0.92 - -
- besi Beton Kg 192.07 - -
- Begesting 2 X pakai m2 24.52 - -
4 Pekerjaan Beton Balok
- Beton Cor K-175 m3 1.17 - -
- besi Beton Kg 191.05 - -
- Begesting 2 X pakai m2 21.72 - -
5 Pekerjaan Meja Beton
- Beton Cor K-175 m3 0.10 - -
- besi Beton Kg 25.69 - -
- Begesting 2 X pakai m2 1.95 - -
Jumlah -
4 PEKERJAAN PASANGAN DAN PELAPIS
1 Pekerjaan Pasangan Batu Kosong m3 3.04 - -
2 Pekerjaan Pasangan Batu Kali Camp 1 : 5 m3 9.13 - -
3 Pekerjaan Pasangan Bata Camp 1:5 m2 123.80 - -
4 Pekerjaan Trasram m2 13.68 - -
5 Pekerjaan Plesteran 1 PC : 5 PS m2 247.59 - -
6 Pekerjaan Acian m2 247.59 - -
7 Pekerjaan Cat Dinding m2 247.59 - -
8 Pek. Pasangan Paras Sangsit m2 11.37 - -
Jumlah -

5 PEKERJAAN ATAP
1 Pekerjaan Rangka Kuda-Kuda Baja Ringan m3 37.23 190,000.00 7,073,700.00
2 Pekerjaan Pasangan Atap Genteng m2 33.66 - -
3 Pekerjaan Pas Bubungan m' 20.56 - -
4 Pekerjaan Pas. Ikut Celedu unit 4.00 - -
5 Pekerjaan Pas. Murda unit 2.00 - -
6 Pekerjaan Pas. Listplank m' 25.53 - -
7 Pekerjaan Pas. Tatab m' 26.13 - -
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
8 Pek. Cat Listplank m2 12.77 - -
Jumlah 7,073,700.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
6 PEKERJAAN LANGIT-LANGIT
1 Pas. Plafond Kasiboard Rangka Hollow m3 37.60 - -
2 Pas. List Gypsum m' 85.85 - -
3 Pek. Cat Plafond m2 37.60 - -
Jumlah -
7 PEKERJAAN PENUTUP LANTAI
1 Pas.Keramik 30 x 30 cm m2 36.91 - -
2 Pas. Keramik 20x30 cm m2 2.25 - -
3 Pas. Keramik Dinding m2 12.60 - -
4 Pas. Stepnozing m' 6.00 - -
Jumlah -
8 PEKERJAAN KUSEN PINTU & JENDELA
1 Pas. Kusen Kayu Kamper m3 0.24 - -
2 Pas. Daun Pintu Kayu Kamper m2 3.46 - -
3 Pas. Jendela Kaca m2 1.76 - -
4 Pas. Kaca Bening t = 5 mm m2 0.78 - -
5 Pas. Engsel Pintu set 4.00 - -
6 Pas. Grendel Pintu unit 2.00 - -
7 Pas. Handle & Kunci Pintu m' 2.00 - -
8 Pas. Engsel Jendela unit 8.00 - -
9 Pas. Grendel Jendela unit 4.00 - -
10 Pas. Kait Angin unit 8.00 - -
Pek. Polituran m2 19.24 - -
Jumlah -
g Pekerjaan Toilet
1 Instalasi Plumbing Air Bersih m 25.00 42,900.00 1,072,500.00
2 Instalasi Plumbing Air Kotor m 36.00 231,170.50 8,322,138.00
3 Closet duduk bh 1.00 - -
4 Pasang Washtafel set 1.00 - -
5 Pasang Floor Drain set 1.00 - -
6 Pasang Kran air set 2.00 - -
7 Pekerjaan Septiktank unit 1.00 - -
8 Pekerjaan Peresapan unit 1.00 - -
Jumlah 9,394,638.00

571,822,156.82
C BANGUNAN ADAT PURA
1 Pekerjaan Tanah
1 Pengukuran dan Pasang Bowplank m' 63.46 - -
1 Urugan Tanah Biasa dipadatkan m3 384.68 - -
1 Urugan Pasir di bawah Pondasi t = 10 cm m3 4.04 - -
Jumlah -

2 Pekerjaan Padmasana & Pelinggih Lain


1 Pek. Padmasana (Batu Tabas Karangasem) set 1.00 92,950,000.00 92,950,000.00
2 Pek. Pasangan Paving Stone/Block m2 160.24 - -
3 Pekerjaan Tugu Pelinggih Wisnu Ls 1.00 22,000,000.00 22,000,000.00
4 Pekerjaan Tugu Penunggun Karang Ls 1.00 22,000,000.00 22,000,000.00
5 Pekerjaan Penyengker ###
- Pek. Pasangan Batu Kali 1 : 5 m3 29.20 - -
- Pek. Candi Bentar unit 2.00 - -
- Pek. Paduraksa unit 9.00 - -
- Pek. Tembok Penyengker m' 27.76 - -
- Pek. Beton Sloof, Kolom, dan Balok K175 m3 2.05 - -
- Pek. Begesting Sloof 2x Pakai m2 12.76 - -
- Pek. Begesting Kolom 2x Pakai m2 3.69 - -
- Pek. Begesting Balok 2x Pakai m2 17.50 - -
- Pek. Pembesian kg 409.10 - -
- Pek. Pengeresek m3 2.02 - -
- Pek. Pasangan Bata Camp. 1 : 5 m2 24.98 - -
6 Pekerjaan Piyasan Ls 1.00 50,765,000.00 50,765,000.00
7 Pekerjaan Penunggun Karang (Belakang) Unit 1.00 19,250,000.00 19,250,000.00
8 Railling Balkon dan Tangga (Pipa Black Steel) m 23.46 15,552,308.48 364,857,156.82
Jumlah 571,822,156.82
###
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6

D PEKERJAAN HALAMAN/LANSCAPE 395,826,377.47

Pekerjaan Halaman/Lanscape
1 Pengukuran dan Pasang Bowplank m' 389.03 - -
2 Galian Tanah dengan excavator m3 1,139.62 - -
3 Pek. Urugan Tanah Kembali m3 1,139.62 - -
4 Pek. Urugan Tanah Dipadatkan m3 3,774.91 - -
5 Pek. Urugan Pasir m3 18.59 - -
6 Pek. Beton K 125 m3 18.59 - -
7 Pasangan Paving Block t = 8 cm m2 1,992.84 - -
8 Pas. Saluran Uditch 50x50 x120 mm m' 112.38 - -
9 Pas Grill Saluran m2 112.38 1,500,000.00 168,570,000.00
10 Pas. Gasebo Unit 1.00 79,750,000.00 79,750,000.00
11 Pas. Kansteen m' 267.57 - -
12 Penanaman Pohon Jepun Bali pohon 22.00 1,796,733.92 39,528,146.15
13 Penanaman Pohon Palem Putri pohon 28.00 1,250,000.00 35,000,000.00
14 Penanaman Pohon Lontar pohon 7.00 725,000.00 5,075,000.00
15 Penananaman Pohon Kelapa Gading pohon 8.00 254,203.92 2,033,631.33
16 Penanaman Pucuk Merah pohon 95.00 45,000.00 4,275,000.00
17 Penanaman Pohon Soka Bangkok pohon 550.00 15,500.00 8,525,000.00
18 Penanaman Pohon Bakung Putih pohon 440.00 18,500.00 8,140,000.00
19 Penanaman Pohon Kana pohon 500.00 25,000.00 12,500,000.00
20 Penanaman Rumput m2 810.74 40,000.00 32,429,600.00
Jumlah 395,826,377.47

E PEKERJAAN PAGAR Err:509

Pekerjaan Pagar ###


1 Pengukuran dan Pasang Bowplank m' 389.03 - -
2 Galian Tanah dengan excavator m3 507.86 - -
3 Pekerjaan DPT Pasangan Batu Kali 1 PC : 4 PS m3 1,177.02 - -
4 Pekerjaan Beton Penguat DPT K-225 m3 98.32 - -
5 Pekerjaan Begesting Sloof 2x Pakai m2 89.06 - -
6 Pekerjaan Begesting Kolom 2x Pakai m2 340.24 - -
7 Pekerjaan Begesting Balok 2x Pakai m2 178.11 - -
8 Pekerjaan Pembesian kg 25,580.15 - -
9 Pekerjaan Beton Sloope, Ring Balk & Kolom Praktis m3 22.73 - -
10 Pekerjaan Pasangan Bata Merah 1 Pc : 5 Ps m2 233.82 - -
11 Pekerjaan Plesteran Tembok 1 PC : 4 PS m2 467.63 - -
12 Pekerjaan Relling Pipa Galvanis m' 197.73 Err:509 Err:509
13 Pekerjaan Pagar Style Bali M1 295.97 - -
14 Pek. Paduraksa Style Bali bh 99.00 - -
15 Pek. Gapura Style Bali Ls 1.00 356,469,181.89 356,469,181.89
16 Sign Board Style Bali Ls 1.00 93,356,477.20 93,356,477.20
Jumlah Err:509

F PEKERJAAN JALAN AKSES Err:509


1 Pengukuran dan Pasang Bowplank m' 161.92 - -
2 Galian Tanah dengan excavator m3 157.68 - -
5 Pekerjaan Urugan Tanah Kembali Dipadatkan m3 1,829.48 - -
6 Pekerjaan Urugan Pasir m3 8.22 - -
7 Pekerjaan Beton K125 m3 4.11 - -
8 Pekerjaan Beton Box Control K 225 m3 25.50 - -
9 Pekerjaan Begesting 2x Pakai m2 49.00 - -
10 Pekerjaan Pembesian kg 2,788.75 - -
11 Pekerjaan DPT Pasangan Batu Kali 1 PC : 4 PS m3 447.71 - -
12 Pekerjaan Urugan Agregat A m3 472.16 - -
13 Pekerjaan Urugan Agregat B m3 700.95 - -
14 Lapis Resap Pengikat - Aspal Cair liter 3,504.76 Err:509 Err:509
15 Lapis Perekat - Aspal Cair liter 1,635.55 Err:509 Err:509
16 Laston Lapis Aus (AC-WC) (gradasi halus/kasar) ton 134.87 Err:509 Err:509
17 Laston Lapis Antara (AC-BC) (gradasi halus/kasar) ton 205.21 Err:509 Err:509
18 Aspal Minyak ton 30.64 Err:509 Err:509
19 Bahan Pengisi (Filler) Tambahan liter 10.42 - -
20 Pekerjaan Box Culvert 3x2x1.2 m bh 11.00 Err:509 Err:509
21 Pekerjaan Kansteen m' 647.68 - -
Jumlah Err:509
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6

G PEKERJAAN MEKANIKAL DAN ELEKTRIKAL


- PEKERJAAN MEKANIKAL DAN ELEKTRIKAL BANGUNAN IPA KAPSITAS 185 L/DTK 10,904,873,315.32
a Pengadaan mekanikal dan aksesoris
1 Perpipaan Koagulator
- Ø 500 mm x 0,60 m' Flange Spigot Steel unit 3.000 2,671,680.00 8,015,040.00
Ø 500 mm DI Gate Valve resilient seat lengkap dengan Floor
- unit 1.000 105,494,400.00 105,494,400.00
Stand
- Ø 500 mm Steel pipa Prasedimentsi ke Koagulator m' 25.000 2,788,646.66 69,716,166.58
- Ø 500 mm x 90 Steel Bend fl -fl unit 6.000 6,177,600.00 37,065,600.00
- Ø 500 mm x 45 Steel Bend fl -fl unit 2.000 6,210,600.00 12,421,200.00
- Ø 500 mm Bell Mouth unit 1.000 2,566,080.00 2,566,080.00
- Ø 500 mm Flange las unit 10.000 845,607.82 8,456,078.18
- Ø 500 mm Flange las unit 6.000 845,607.82 5,073,646.91
- Ø 500 mm Karet Packing unit 10.000 42,988.00 429,880.00
- Ø 500 mm Karet Packing unit 6.000 42,988.00 257,928.00
- 1" x 5" Baud Mur set 200.000 29,700.00 5,940,000.00
- Ø 500 mm x 0,60 m' wall pipe unit 5.000 10,348,800.00 51,744,000.00
unit 2.000 45,144,000.00 90,288,000.00
2 Perpipaan Flokulasi ###
Pintu Air Ukuran 400 mm x 468 mm lengkap dengan Floor
- unit 10.000 27,722,760.21 277,227,602.08
Stand
- Ø 200 mm Steel pipa Sch. 40 m' 20.000 895,803.34 17,916,066.74
- Ø 100 mm Steel Pipa Sch 40 m' 60.000 712,031.56 42,721,893.72
Ø 200 mm DI Batter Fly Valve Resilent seat lengkap dengan
- unit 2.000 10,098,000.00 20,196,000.00
floor Stand drain
- Ø 200 mm x Ø 100 mm Steel Tee Y fl - fl unit 10.000 1,393,920.00 13,939,200.00
- Ø 100 mm DI Butterfly Valve resilien seat fl - fl unit 18.000 4,158,000.00 74,844,000.00
- Ø 200 mm x 90 Bend Steel All flange unit 2.000 1,438,968.96 2,877,937.92
- Ø 200 mm Karet Packing unit 4.000 25,300.00 101,200.00
- Ø 100 mm Karet Packing unit 20.000 9,680.00 193,600.00
- Ø 100 mm Karet Packing unit 28.000 9,680.00 271,040.00
- 3/4" x 4" Baud Mur set 256.000 22,275.00 5,702,400.00
- M16 Baud mur set 384.000 29,458.00 11,311,872.00
- M20 Baud mur set 48.000 39,768.30 1,908,878.40
- Ø 100 mm x 90 Bend Steel All flange unit 12.000 132,000.00 1,584,000.00
- Ø 100 mm Wall Pipe unit 12.000 896,148.00 10,753,776.00
- Ø 200 mm Flange Las unit 4.000 412,500.00 1,650,000.00
- Ø 100 mm Flange Las unit 48.000 205,920.00 9,884,160.00
3 Perpipaan Sedimentasi ###
- Ø 300 mm Steel pipa Sch. 40 drain m' 38.000 2,598,676.66 98,749,713.19
- Ø 300 mm Tee Y Steel fl - fl drain unit 12.000 3,843,840.00 46,126,080.00
- Ø 300 mm DI Butterfly Valve lengkap dengan Pneumatic unit 6.000 45,714,240.00 274,285,440.00
- Ø 300 mm x 90 Steel Bend fl - fl unit 6.000 1,872,200.00 11,233,200.00
- Ø 300 mm Flange las unit 12.000 748,000.00 8,976,000.00
- Ø 300 mm Plat Cap unit 6.000 1,785,590.40 10,713,542.40
- Ø 300 mm Karet Packing unit 12.000 36,850.00 442,200.00
- Ø 300 mm Karet Packing unit 6.000 36,850.00 221,100.00
- Ø 700 mm Steel pipa Sch. 40 m' 42.000 5,626,698.00 236,321,316.00
- Ø 700 mm Flange las unit 4.000 3,190,000.00 12,760,000.00
- Ø 700 mm Flange las unit 12.000 3,190,000.00 38,280,000.00
- Ø 700 mm Blange Flange unit 4.000 14,320,152.00 57,280,608.00
- Ø 700 mm x 0,6 m' Flange las unit 4.000 6,945,523.20 27,782,092.80
- Ø 700 mm Karet Packing unit 8.000 56,100.00 448,800.00
- 1" x 5" Baud Mur set 240.000 29,700.00 7,128,000.00

- Highrate Palte Settler Stainless Steel minimal SUS 304 lbr 1,380.000 1,357,105.75 1,872,805,935.00

Pengadaan dan pemasangan 0.30 m' x 0.30 m' x 7.05 m' SS


- unit 4.000 6,055,038.00 24,220,152.00
Gutter
Ø 300 mm DI Butterfly Valve lengkap dengan Pneumatic
- unit 6.000 45,714,240.00 274,285,440.00
(position)
- Ø 400 mm pipa PVC untuk penguras unit 40.000 1,711,875.00 68,475,000.00
- M24 Baud mur set 216.000 44,187.00 9,544,392.00
- M33 Baud mur set 192.000 53,465.50 10,265,376.00
- Ø 300 mm Penguras PVC m' 40.000 1,175,625.00 47,025,000.00
4 Perpipaan Filter ###
- Ø 200 mm Steel pipa Sch. 40 m' 13.500 895,803.34 12,093,345.05
- Ø 300 mm Steel pipa Sch. 40 m' 16.000 2,598,676.66 41,578,826.61
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Ø 200 mm x 90 Bend Steel All flange unit 6.000 1,438,968.96 8,633,813.76
- Ø 200 mm x 90 Bend Steel All flange unit 1.000 1,438,968.96 1,438,968.96
- Ø 200 DI Butterfly Valve fl - fl lengkap Pneumatic unit 6.000 74,271,312.50 445,627,875.00
- Ø 300 DI Butterfly Valve fl - fl lengkap Pneumatic unit 12.000 73,302,550.75 879,630,609.00
- Ø 300 mm x Ø 200 mm Steel Reducer fl -fl unit 6.000 2,718,144.00 16,308,864.00
- Ø 300 mm x Ø 300 mm Steel Tee fl - fl unit 6.000 3,843,840.00 23,063,040.00
- Ø 300 DI Butterfly Valve fl - fl lengkap Pneumatic unit 6.000 110,624,250.00 663,745,500.00
- Ø 300 mm x 0.60 m' Flange Spigot Steel unit 6.000 1,246,080.00 7,476,480.00
- Ø 200 mm Flange las unit 12.000 453,200.00 5,438,400.00
- Ø 200 mm Flange las unit 32.000 453,200.00 14,502,400.00
- Ø 300 mm Flange las unit 18.000 880,000.00 15,840,000.00
- Ø 300 mm Flange las unit 24.000 880,000.00 21,120,000.00
- Ø 200 mm Karet Packing unit 12.000 25,300.00 303,600.00
- Ø 200 mm Karet Packing unit 26.000 25,300.00 657,800.00
- Ø 300 mm Karet Packing unit 18.000 36,850.00 663,300.00
- Ø 300 mm Karet Packing unit 24.000 36,850.00 884,400.00
- Pengadaan dan pemasangan Nosel filter set 3,672.000 143,675.40 527,576,068.80

- Pengadaan dan Pemasangan Gravel Cilica Uk. 5-30 mm m3 32.400 6,930,000.00 224,532,000.00

- Pengadaan dan Pemasangan Silica sand 0.8 - 1.2 mm m3 75.600 13,513,500.00 1,021,620,600.00

- Ø 200 mm x 0,60 m' wall pipe unit 6.000 641,520.00 3,849,120.00


- Ø 300 mm x 0.60 m' Wall Pipe unit 12.000 3,687,800.60 44,253,607.20
- M24 Baud mur set 504.000 44,187.00 22,270,248.00
- M20 Baud mur set 456.000 39,768.30 18,134,344.80
5 Perpipaan Clear Well ( Out ) ###
- Ø 500 mm x 1000 m' Spigot Flange ( Wall pipe ) unit 1.000 10,348,800.00 10,348,800.00
- Ø 500 mm x Ø 300 mm Steel Tee all flange unit 1.000 8,052,000.00 8,052,000.00
- Ø 500 mm Flange las unit 3.000 1,738,000.00 5,214,000.00
Ø 500 mm DI Gate Valve resilient seat lengkap dengan Floor
- unit 1.000 105,494,400.00 105,494,400.00
Stand
- Ø 300 mm CI Bellmouth unit 1.000 2,566,080.00 2,566,080.00
- Ø 300 mm x 750 mm double Flange ( wall pipe ) unit 3.000 2,354,880.00 7,064,640.00
- Ø 300 mm x 90 Steel Bend all flange unit 2.000 1,872,200.00 3,744,400.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Ø 500 mm Karet Packing unit 4.000 42,988.00 171,952.00
- Ø 300 mm Karet Packing unit 4.000 36,850.00 147,400.00
- 1" x 5" Baud Mur set 60.000 29,700.00 1,782,000.00
- 3/4" x 4" Baud Mur set 60.000 22,275.00 1,336,500.00
6 Perpipaan Blower ###
- Ø 100 mm Steel Pipa Sch 40 m' 23.000 712,031.56 16,376,725.93
- Ø 100 mm x 90 Steel Bend all flange unit 9.000 505,296.00 4,547,664.00
- Ø 100 mm x Ø 100 mm Steel Tee all flange unit 5.000 1,542,024.00 7,710,120.00
- Ø 100 mm Butterfly fl - fl lengkap Pneumatic unit 6.000 18,506,950.00 111,041,700.00
- Ø 100 mm Flange las unit 20.000 205,920.00 4,118,400.00
- Ø 100 mm Flange las unit 15.000 205,920.00 3,088,800.00
- Ø 300 mm Karet Packing unit 20.000 36,850.00 737,000.00
- 5/8" x 4" Baud Mur set 160.000 11,880.00 1,900,800.00
- Ø 50 mm Steel Pipa Sch 40 m 69.000 375,111.00 25,882,659.00
- Ø 50 mm x 90 Steel Bend all flange unit 18.000 41,250.00 742,500.00
- M16 Baud mur set 280.000 29,458.00 8,248,240.00
7 Blower / Air Compressor pencucian
Blower pencucian, Pressure: 35 m', Kap: 4,47 m3/min 1030
- rpm, 18,5 kW, 3 phase, unit 2.000 226,144,934.40 452,289,868.80
size 125 mm, dilengkapi safety valve

Air Compressor, P = 10kg/cm2, Q = m3/hr, dilengkapi tangki


- kapasitas 3000 lt, pressure switch, pressure indikator, safety set 2.000 433,899,439.67 867,798,879.33
valve, air dryer, air drain, dan perpipaan, Motor 18,5kW

Pompa backwash type centrifugal, Q = 50 L/d, Daya motor, P


- unit 2.000 49,034,700.00 98,069,400.00
= 7,5 kW, eff. Min 85%, 4P 50 Hz, 1450 rpm
8 Perpipaan Air Wash ###
- Ø 150 mm Steel Pipa Sch. 40 m' 30.000 1,251,862.51 37,555,875.39
- Ø 150 mm x 90 Steel Bend all flange unit 9.000 833,976.00 7,505,784.00
- Ø 150 mm x Ø 100 mm Steel Tee all flange unit 5.000 1,542,024.00 7,710,120.00
- Ø 150 mm Butterfly fl - fl lengkap Pneumatic unit 6.000 24,212,100.00 145,272,600.00
- Ø 150 mm Flange las unit 20.000 625,680.00 12,513,600.00
- Ø 150 mm Karet Packing unit 20.000 16,500.00 330,000.00
- 5/8" x 4" Baud Mur set 160.000 11,880.00 1,900,800.00
- Ø 200 mm Steel Pipa Sch. 40 unit 8.000 895,803.34 7,166,426.70
- Ø 300 mm Steel Pipa Sch. 40 unit 13.000 2,598,676.66 33,782,796.62
- Ø 200 mm Butterfly fl - fl lengkap Pneumatic unit 6.000 13,727,191.50 82,363,149.00
- Ø 300 mm Blange Flange unit 1.000 1,485,000.00 1,485,000.00
- Ø 300 mm x Ø 200 mm Steel Tee all flange unit 6.000 2,718,144.00 16,308,864.00
- Ø 200 mm x 90 Steel Bend fl-fl unit 8.000 1,438,968.96 11,511,751.68
- Reducer Ø 300 mm - Ø 200 mm unit 1.000 2,718,144.00 2,718,144.00
- Ø 300 mm Flange las unit 1.000 880,000.00 880,000.00
- Ø 200 mm Karet Packing unit 35.000 25,300.00 885,500.00
- Ø 300 mm Karet Packing unit 1.000 36,850.00 36,850.00
- M24 Baud mur set 24.000 44,187.00 1,060,488.00
- M20 Baud Mur set 420.000 39,768.30 16,702,686.00
Jumlah 10,185,329,609.54
b Pemasangan mekanikal dan aksesoris
1 Perpipaan Koagulator
- Ø 500 mm x 0,60 m' Flange Spigot Steel unit 3.000 845,607.82 2,536,823.45
Ø 500 mm DI Gate Valve resilient seat lengkap dengan Floor
- unit 1.000 246,664.00 246,664.00
Stand
- Ø 500 mm Steel pipa Prasedimentsi ke Koagulator m' 25.000 33,163.22 829,080.45
- Ø 500 mm x 90 Steel Bend fl -fl unit 2.000 113,300.00 226,600.00
- Ø 500 mm x 45 Steel Bend fl -fl unit 2.000 113,300.00 226,600.00
- Ø 500 mm Bell Mouth unit 1.000 104,489.00 104,489.00
- Plat Koagulator Uk. 15 m' x 1,5 m' x 12 mm lengkap konstruksi unit 1.000 2,695,000.00 2,695,000.00
- Ø 500 mm Flange las unit 16.000 845,607.82 13,529,725.09
- Ø 500 mm Karet Packing unit 16.000 1,561.66 24,986.50
- Ø 500 mm x 0,60 m' wall pipe unit 5.000 139,975.00 699,875.00
- M30 Baud Mur set 320.000 892.38 285,560.00
- #REF! unit 2.000 246,664.00 493,328.00
2 Perpipaan Flokulasi ###
Pintu Air Ukuran 400 mm x 468 mm lengkap dengan Floor
- unit 10.000 1,930,500.00 19,305,000.00
Stand
- Ø 200 mm Steel pipa Sch. 40 m' 20.000 12,286.29 245,725.70
- Ø 100 mm Steel Pipa Sch 40 m' 60.000 6,059.96 363,597.30
- Ø 100 mm Steel Pipa Sch 40 m' 36.000 6,059.96 218,158.38
- Ø 200 mm x Ø 100 mm Steel Tee Y fl - fl unit 10.000 86,949.50 869,495.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Ø 100 mm DI Butterfly Valve resilien seat fl - fl unit 10.000 85,800.00 858,000.00
- Ø 100 mm DI Butterfly Valve resilien seat fl - fl unit 8.000 85,800.00 686,400.00
- Ø 200 mm x 90 Bend Steel All flange unit 2.000 87,609.50 175,219.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Ø 200 mm Karet Packing unit 4.000 1,561.66 6,246.63
- Ø 100 mm Karet Packing unit 48.000 1,561.66 74,959.50
- M16 Baud Mur set 320.000 892.38 285,560.00
- M20 Baud Mur set 48.000 892.38 42,834.00
- Ø 100 mm x 90 Bend Steel All flange unit 10.000 77,407.00 774,070.00
- Ø 200 mm Flange Las unit 4.000 367,518.25 1,470,073.00
- Ø 100 mm Flange Las unit 40.000 215,392.38 8,615,695.00
3 Perpipaan Sedimentasi ###
- Ø 300 mm Steel pipa Sch. 40 drain m' 38.000 196,303.35 7,459,527.26
- Ø 300 mm Tee Y Steel fl - fl drain unit 12.000 129,827.50 1,557,930.00
- Ø 300 mm x 90 Steel Bend fl - fl unit 6.000 136,620.00 819,720.00
- Ø 300 mm Flange las unit 12.000 521,723.13 6,260,677.50
- Ø 300 mm Plat Cap unit 6.000 521,723.13 3,130,338.75
- Ø 700 mm Steel pipa Sch. 40 m' 42.000 386,455.10 16,231,114.28
- Ø 700 mm Flange las unit 16.000 1,166,411.13 18,662,578.00
- Ø 700 mm Blange Flange unit 4.000 1,166,411.13 4,665,644.50
- Ø 700 mm x 0,6 m' Flange las unit 4.000 1,166,411.13 4,665,644.50

- Highrate Palte Settler Stainless Steel minimal SUS 304 lbr 1,380.000 60,456.00 83,429,280.00

Ø 300 mm DI Butterfly Valve lengkap dengan Pneumatic


- unit 6.000 215,077.50 1,290,465.00
(position)
- Ø 400 mm pipa PVC untuk penguras unit 40.000 121,680.63 4,867,225.00
- M24 Baud mur set 216.000 892.38 192,753.00
- M33 Baud mur set 192.000 892.38 171,336.00
- Ø 300 mm Karet Packing unit 18.000 1,561.66 28,109.81
- Ø 700 mm Karet Packing unit 8.000 1,561.66 12,493.25
- Ø 300 mm pipa PVC untuk penguras unit 40.000 121,680.63 4,867,225.00
4 Perpipaan Filter ###
- Ø 200 mm Steel pipa Sch. 40 m' 13.500 12,286.29 165,864.85
- Ø 300 mm Steel pipa Sch. 40 m' 16.000 196,303.35 3,140,853.58
- Ø 200 mm x 90 Bend Steel All flange unit 6.000 87,609.50 525,657.00
- Ø 200 DI Butterfly Valve fl - fl lengkap Pneumatic unit 6.000 214,901.50 1,289,409.00
- Ø 300 mm x Ø 200 mm Steel Reducer fl -fl unit 6.000 129,827.50 778,965.00
- Ø 300 mm x Ø 300 mm Steel Tee fl - fl unit 6.000 129,827.50 778,965.00
- Ø 300 DI Butterfly Valve fl - fl lengkap Pneumatic unit 6.000 215,077.50 1,290,465.00
- Ø 300 mm x 0.60 m' Flange Spigot Steel unit 6.000 521,723.13 3,130,338.75
- Ø 200 mm Flange las unit 44.000 367,518.25 16,170,803.00
- Ø 300 mm Flange las unit 42.000 521,723.13 21,912,371.25
- Ø 200 mm Karet Packing unit 38.000 1,561.66 59,342.94
- Ø 300 mm Karet Packing unit 42.000 1,561.66 65,589.56
- Ø 300 DI Butterfly Valve fl - fl lengkap Pneumatic unit 12.000 215,077.50 2,580,930.00
- Ø 700 mm Blank Flange unit 2.000 1,166,411.13 2,332,822.25
- Ø 200 mm x 0,60 m' wall pipe unit 7.000 101,594.63 711,162.38
- Ø 300 mm x 0.60 m' Wall Pipe unit 12.000 129,910.00 1,558,920.00
- M24 Baud Mur set 504.000 892.38 449,757.00
- M20 Baud Mur set 12.000 892.38 10,708.50
- M33 Baud Mur set 48.000 892.38 42,834.00
5 Perpipaan Clear Well ( Out ) ###
- Ø 500 mm x 1000 m' Spigot Flange ( Wall pipe ) unit 1.000 139,975.00 139,975.00
- Ø 500 mm x Ø 300 mm Steel Tee all flange unit 1.000 164,780.00 164,780.00
- Ø 500 mm Flange las unit 3.000 845,607.82 2,536,823.45
Ø 500 mm DI Gate Valve resilient seat lengkap dengan Floor
- unit 1.000 246,664.00 246,664.00
Stand
- Ø 300 mm CI Bellmouth unit 1.000 88,951.50 88,951.50
- Ø 300 mm x 750 mm double Flange ( wall pipe ) unit 3.000 129,910.00 389,730.00
- Ø 300 mm x 90 Steel Bend all flange unit 2.000 99,253.00 198,506.00
6 Perpipaan Blower ###
- Ø 100 mm Steel Pipa Sch 40 m' 23.000 6,059.96 139,378.97
- Ø 100 mm x 90 Steel Bend all flange unit 9.000 77,407.00 696,663.00
- Ø 100 mm x Ø 100 mm Steel Tee all flange unit 5.000 79,156.00 395,780.00
- Ø 100 mm Butterfly fl - fl lengkap Pneumatic unit 6.000 85,800.00 514,800.00
- Ø 100 mm Flange las unit 35.000 215,392.38 7,538,733.13
- Ø 50 mm Steel Pipa Sch 40 unit 69.000 87,168.40 6,014,619.60
- Ø 50 mm x 90 Steel Bend all flange unit 18.000 87,277.91 1,571,002.29
- M16 Baud mur set 280.000 892.38 249,865.00
7 Blower / Air Compressor pencucian ###
Blower pencucian, Pressure: 35 m', Kap: 4,47 m3/min 1030
- rpm, 18,5 kW, 3 phase, unit 2.000 11,509,161.84 23,018,323.68
size 125 mm, dilengkapi safety valve
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6

Air Compressor, P = 10kg/cm2, Q = m3/hr, dilengkapi tangki


- kapasitas 3000 lt, pressure switch, pressure indikator, safety set 2.000 7,672,774.56 15,345,549.12
valve, air dryer, air drain, dan perpipaan, Motor 18,5kW

Pompa backwash type centrifugal, Q = 50 L/d, Daya motor, P


- unit 2.000 728,706.00 1,457,412.00
= 7,5 kW, eff. Min 85%, 4P 50 Hz, 1450 rpm
Perpipaan Tubing Pollyeurthan tube 8mm , Nepple For
- Ls 1.000 85,800,000.00 85,800,000.00
selenoid + Material support
8 Perpipaan Air Wash ###
- Ø 150 mm Steel Pipa Sch. 40 m' 30.000 9,165.90 274,977.12
- Ø 150 mm x 90 Steel Bend all flange unit 9.000 84,634.00 761,706.00
- Ø 150 mm x Ø 100 mm Steel Tee all flange unit 5.000 84,221.50 421,107.50
- Ø 150 mm Butterfly fl - fl lengkap Pneumatic unit 6.000 214,357.00 1,286,142.00
- Ø 150 mm Flange las unit 20.000 292,717.57 5,854,351.36
- Ø 200 mm Steel Pipa Sch. 40 unit 8.000 12,286.29 98,290.28
- Ø 300 mm Steel Pipa Sch. 40 unit 13.000 196,303.35 2,551,943.54
- Ø 200 mm Butterfly fl - fl lengkap Pneumatic unit 6.000 214,901.50 1,289,409.00
- Ø 300 mm Blange Flange unit 1.000 521,723.13 521,723.13
- Ø 300 mm x Ø 200 mm Steel Tee all flange unit 6.000 129,827.50 778,965.00
- Ø 200 mm x 90 Steel Bend fl-fl unit 8.000 87,609.50 700,876.00
- Reducer Ø 300 mm - Ø 200 mm unit 1.000 129,827.50 129,827.50
- Ø 200 mm Flange las unit 35.000 367,518.25 12,863,138.75
- Ø 300 mm Flange las unit 1.000 521,723.13 521,723.13
- Ø 200 mm Karet Packing unit 35.000 1,561.66 54,657.97
- Ø 300 mm Karet Packing unit 1.000 1,561.66 1,561.66
- M24 Baud Mur set 24.000 892.38 21,417.00
- M20 Baud Mur set 420.000 892.38 374,797.50
Jumlah 446,211,757.07
Pengadaan elektrikal dan aksesoris
1 Panel Utama Filter dan Kontrol pencucian (M-FL)
- Box Panel unit 1.000 3,850,000.00 3,850,000.00
- Bus Bar 3P+N/1205A +PE dan acessories set 1.000 1,615,320.96 1,615,320.96
MCCB 3P(252-630)A 50KA + Micrologic 2,0 manually
- set 1.000 8,026,150.00 8,026,150.00
operated
- MCCB 3P(100-125)A 36KA + electronic trip set 1.000 3,647,394.73 3,647,394.73
- MCCB 3P(80-100)A 25KA + electronic trip set 1.000 3,647,394.73 3,647,394.73
- MCB 3P/16A, 10A unit 1.000 190,129.50 190,129.50
- MCB 3P/25A 10A unit 3.000 190,129.50 570,388.50
- MCB 2P/20A 10A unit 1.000 117,568.00 117,568.00
DOL Starting Motor 0.55kW, 3 komponen, type high
- set 60.000 499,290.00 29,957,400.00
performance
- Contactor 3P, 9A, AC3, 380 V unit 60.000 139,700.00 8,382,000.00
- Voltmeter (0-500)V, Uk 72x72 unit 1.000 224,400.00 224,400.00
- VS (Voltage Selector switch, 7 posisi) unit 1.000 126,500.00 126,500.00
-MCB 1P/4A 6A unit 24.000 40,414.00 969,936.00
- Sequence control relay (auxiliary relay) dan kelengkapannya te LS 1.000 2,422,981.00 2,422,981.00
2 Panel Meja Kontrol Filter (MCD-FL)
- Box Panel unit 1.000 3,850,000.00 3,850,000.00
- MCB 1P/4A 6A unit 12.000 40,414.00 484,968.00
Plug relay 220V, 14 pin, 4 kontak C/O, 5 amp, built in pilot
- unit 60.000 46,750.00 2,805,000.00
light komplit dengan dudukan
- Pilot lamp, Ø 22 mm plastic 220-240 VAC unit 12.000 8,800.00 105,600.00
- Push button Ø 22 mm flush, plastic (reset) unit 2.000 42,900.00 85,800.00
- Push button Ø 22 mm, plastic 220-240 VAC unit 120.000 42,900.00 5,148,000.00
Local Control panel sludge drain valve (LCP-SD 1/2,…LCP-SD-
3
SD10)
Local control panel, type metal (zinc alloy), IP 65, 4 lubang
- LS 6.000 5,169,071.07 31,014,426.43
komlit pust button start-stop, ukuran 80 x 130mm
4 Panel Kontrol Blower Pencucian (PC-BWR)
- Box Panel unit 1.000 3,850,000.00 3,850,000.00
- Bus Bar 3P+N/205A +PE dan acessories set 1.000 1,615,320.96 1,615,320.96
- MCCB 3P(100-125)A 36KA + electronic trip set 1.000 2,162,050.00 2,162,050.00
- MCB 3P/25A 10A unit 2.000 190,129.50 380,259.00
- MCB 2P/16A 10A unit 1.000 117,568.00 117,568.00
- MCB 4P/20A 10A unit 1.000 253,506.00 253,506.00
DOL Starting Motor 0.55kW, 3 komponen, type high
- set 60.000 499,290.00 29,957,400.00
performance
- Contactor 3P, 9A, AC3, 380 V unit 60.000 139,700.00 8,382,000.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Voltmeter (0-500)V, Uk 72x72 unit 1.000 224,400.00 224,400.00
- VS (Voltage Selector switch, 7 posisi) unit 1.000 126,500.00 126,500.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- MCB 1P/4A 6A unit 1.000 40,414.00 40,414.00
Relay arus bocor (Modul Vigi) 4P, 40A, Sensitifitas = 300
- unit 1.000 269,500.00 269,500.00
mA
- Voltmeter (0-500)V, Uk 72x72 unit 1.000 224,400.00 224,400.00
- VS (Voltage Selector switch, 7 posisi) unit 1.000 126,500.00 126,500.00
- Amperemeter 3P/0-50A unit 4.000 56,100.00 224,400.00
- CT 50/5 unit 4.000 219,120.00 876,480.00
Star delta Starting Motor 18,5 kW, 3 komponen, type high
- set 4.000 323,064.19 1,292,256.77
performance
- (Kordinasi Type 2), terdiri dari :
Fuse carrier (STI), 2P(1P+N), lengkap denan tabung sedring (fuse catrige), type aM,
- set 4.000 282,681.17 1,130,724.67
Ukuran 10,3x38mm, 2A, 500V, 80kA
- Buzzer, 70 dBA unit 1.000 20,350.00 20,350.00
- Hour counter 220V unit 4.000 218,068.33 872,273.34
RCP (Relay Control Phase) untuk unbalanced/missing phase 2
- kontak output C/O, Delay unit 4.000 502,364.82 2,009,459.28
(0.1-10) detik, (380-500)V
Plug in relay 220V, 14 pin, 4 kontak C/O, 5 amp, built in
- unit 8.000 46,750.00 374,000.00
pilot light, komplit dengan dudukan
- Pilot lamp, Ø 22 mm plastic 220-240 VAC unit 7.000 8,800.00 61,600.00
- Push button Ø 22 mm flush, plastic (reset) unit 2.000 42,900.00 85,800.00
- Push button Ø 22 mm, plastic 220-240 VAC unit 8.000 42,900.00 343,200.00
Plug dan Socket 2P+E, 16A, 220 VAC, Panel mounted
- set 1.000 237,452.18 237,452.18
komplit
Plug dan Socket 3P+N+E, 16A, 380 VAC, Panel mounted
- set 1.000 237,452.18 237,452.18
komplit
5 Panel Ruang Pompa Air Cuci Filter (PP-BW)

- Box Plastic mini pragma pintu tranparant, inbow, 24 modul unit 1.000 297,880.00 297,880.00

- MCB 3P/16A 10 KA unit 1.000 190,129.50 190,129.50


- RCCB/ELCB, 4P, 25A, Sensitifitas : 30 mA unit 1.000 568,551.50 568,551.50
- MCB 1P/6A 6 KA unit 3.000 40,414.00 121,242.00
- MCB 1P/10A 6 KA unit 4.000 40,414.00 161,656.00
6 Panel Ruang Blower (PP-BWR)

- Box Plastic mini pragma pintu tranparant, inbow, 24 modul unit 1.000 297,880.00 297,880.00

- MCB 3P/16A 10 KA unit 1.000 190,129.50 190,129.50


- RCCB/ELCB, 4P, 25A, Sensitifitas : 30 mA unit 1.000 568,551.50 568,551.50
- MCB 1P/6A 6 KA unit 3.000 40,414.00 121,242.00
- MCB 1P/10A 6 KA unit 4.000 40,414.00 161,656.00
7 Panel Lampu Luar Filter (PP-LR 2)
- Box Panel outdoor type unit 1.000 269,500.00 269,500.00
- MCB 3P/32A 6 KA unit 1.000 190,129.50 190,129.50
- Contactor, 3P, 32 A AC1, 380 V unit 2.000 396,550.00 793,100.00
- Photo cell unit 1.000 96,919.26 96,919.26
- MCB 3P/16A 6 KA unit 3.000 190,129.50 570,388.50
- Push button dia. 22 mm, plastic 220-240 VAC unit 4.000 42,900.00 171,600.00
8 Penerangan Ruang Filter
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 10.000 396,000.00 3,960,000.00
- Lampu Phillips 2 x 36W/220V, WP (water proof) unit 12.000 528,000.00 6,336,000.00
- Single switch 10 A/ 220V plano unit 8.000 18,700.00 149,600.00
- Double Switch 10 A/ 220V plano unit 5.000 23,100.00 115,500.00
- Outlet 10A/2P+E, 220V, WP (water proof) unit 4.000 253,605.40 1,014,421.58
- Kabel NYM 3 x 2,5 mm2 m 250.000 14,300.00 3,575,000.00
- uPVC Conduit 20 mm m 220.000 8,635.00 1,899,700.00
- uPVC Conduit 25 mm m 2.000 17,600.00 35,200.00
Exhaust fan, Industrial type, wall mounted, 16", komplit base
- set 4.000 583,000.00 2,332,000.00
frame
9 Penerangan Ruang Blower Pencucian
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 8.000 396,000.00 3,168,000.00
- Single switch 10 A/ 220V plano unit 4.000 18,700.00 74,800.00
- Double Switch 10 A/ 220V plano unit 2.000 23,100.00 46,200.00
- Outlet 10A/2P+E, 220V, WP (water proof) unit 1.000 253,605.40 253,605.40
- Kabel NYM 3 x 2,5 mm2 m 50.000 14,300.00 715,000.00
- uPVC Conduit 20 mm m 45.000 8,635.00 388,575.00
- uPVC Conduit 25 mm m 2.000 17,600.00 35,200.00
Exhaust fan, Industrial type, wall mounted, 16", komplit base
- set 1.000 583,000.00 583,000.00
frame

10 Penangkal Petir Bangunan IPA - Filter


HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6

- Penangkal Petir type Elctrode dengan Rmin = 60m LS 1.000 10,822,650.43 10,822,650.43
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- BC 50 mm2 m 70.000 54,450.00 3,811,500.00
- Clamp BC, 50 mm2 unit 390.000 40,383.02 15,749,379.36
- Air terminal Ø 1, termasuk dudukan, komplit set 4.000 686,511.41 2,746,045.63
- GIP Ø 2 termasuk socket set 4.000 662,281.60 2,649,126.39
- Grounding rod 3/4 set 4.000 282,681.17 1,130,724.67
- Pipa PVC Ø 1, termasuk clamp set 8.000 290,757.78 2,326,062.20
- Box control 30x30x70 cm LS 2.000 848,043.50 1,696,087.01
11 Instalasi Penerangan
- Lampu Mercury 250 watt Sorot unit 2.000 154,000.00 308,000.00
- Lampu Mercury 250 watt Sorot unit 2.000 154,000.00 308,000.00
- Kabel dari P. Penerangan R. Kimia ke Disconecting Switch
- - NYFGBY 4 x 2,5 mm2 meter 75.000 72,380.00 5,428,500.00
- Kabel dari DS ke lampu2
- - NYY 3 x 2,5 mm2 meter 40.000 35,420.00 1,416,800.00
- Pipa PVC 20mm meter 40.000 17,556.00 702,240.00
- Disconecting switch Outdoor Type unit 1.000 1,232,000.00 1,232,000.00
12 Panel Lokal Valve Sedimentasi -

- Panel Lokal Filter Outdoor type double door dengan support unit 2.000 5,390,000.00 10,780,000.00

- Selenoid valve + manifold 6 selenoid (by others)


Plug in relay 220V, 14 pin, 4 kontak C/O, 5 amp, built in
- unit 6.000 46,750.00 280,500.00
pilot light, komplit dengan dudukan
- Illuminated Push Button Green, 220VAC unit 6.000 475,860.00 2,855,160.00
- Illuminated Push Button Red, 220VAC unit 6.000 475,860.00 2,855,160.00
- Selector Switch 3 Posisi unit 6.000 342,034.00 2,052,204.00
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.000 807,660.48 807,660.48
Jumlah 262,146,781.64
-
Pemasangan elektrikal dan aksesoris
1 Panel Utama Filter dan Kontrol pencucian (M-FL)

- Perakitan dan Pemasangan lengkap termasuk aksesoris set 1.000 807,660.48 807,660.48

2 Panel Meja Kontrol Filter (MCD-FL)

- Perakitan dan Pemasangan lengkap termasuk aksesoris set 1.000 807,660.48 807,660.48

3 Local Control panel sludge drain valve (LCP-SD 1/2,…LCP-SD-SD10)

- Perakitan dan Pemasangan lengkap termasuk aksesoris set 1.000 807,660.48 807,660.48

4 Panel Kontrol Blower Pencucian (PC-BWR)

- Perakitan dan Pemasangan lengkap termasuk aksesoris set 1.000 807,660.48 807,660.48

5 Panel Ruang Pompa Air Cuci Filter (PP-BW)

- Perakitan dan Pemasangan lengkap termasuk aksesoris set 1.000 807,660.48 807,660.48

6 Panel Ruang Blower (PP-BWR)

- Perakitan dan Pemasangan lengkap termasuk aksesoris set 1.000 807,660.48 807,660.48

7 Panel Lampu Luar Filter (PP-LR 2) ###

- Perakitan dan Pemasangan lengkap termasuk aksesoris set 1.000 807,660.48 807,660.48

8 Penerangan Ruang Filter


- Lampu philips 2 x 18W/220V, WP (Water proof) unit 10.000 40,370.00 403,700.00
- Lampu Phillips 2 x 36W/220V, WP (water proof) unit 12.000 40,370.00 484,440.00
- Outlet 10A/2P+E, 220V, WP (water proof) unit 4.000 24,200.00 96,800.00
Exhaust fan, Industrial type, wall mounted, 16", komplit base
- set 4.000 242,220.00 968,880.00
frame
- Titik Lampu titik 22.000 72,689.44 1,599,167.70
9 Penerangan Ruang Blower Pencucian
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 8.000 40,370.00 322,960.00
- Outlet 10A/2P+E, 220V, WP (water proof) unit 1.000 24,200.00 24,200.00
Exhaust fan, Industrial type, wall mounted, 16", komplit base
- set 1.000 242,220.00 242,220.00
frame
- Titik Lampu titik 8.000 72,689.44 581,515.53
10 Penangkal Petir Bangunan IPA - Filter

- Perakitan dan Pemasangan lengkap termasuk aksesoris set 1.000 807,660.48 807,660.48

Jumlah 11,185,167.07
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6

- PEKERJAAN MEKANIKAL DAN ELEKTRIKAL BANGUNAN KIMIA DAN CHLORINE 4,294,133,669.20


a Pengadaan Mekanikal dan aksesoris
1 Crane untuk Ruang Kimia -

Electric Motor Hoist crane, Kapasitas 1 ton, lengkap dengan


- set 1.00 41,694,048.00 41,694,048.00
span, flat bar, conductor dan pendant push button ( R.Kimia )

Electric Motor Hoist crane, Kapasitas 2 ton, lengkap dengan


- set 1.00 45,424,896.00 45,424,896.00
span, flat bar, conductor dan pendant push button ( R. Chlor )

2 Pompa Dosing dan pengaduk


Mixer 580 rpm, Drive: 4kW, 380V, dilengkapi dengan gear,
- reducer, stainless steel shaft set 4.00 56,536,233.60 226,144,934.40
support, control dan drain oil.
Pompa dozing alum Q = 250 l/jam; P=6,9 bar, Motor =
- unit 3.00 24,229,814.40 72,689,443.20
1,1kW, 380V, 3 phase
Pompa dosing soda ash Q = 450l/jam; P = 6,9 bar, Motor =
- unit 3.00 24,229,814.40 72,689,443.20
0,55kW, 380V, 3 phase
- IWF Baja 150 x 300 mm Kg 910.16 - -
Jumlah 458,642,764.80
b Pemasangan mekanikal dan aksesoris
1 Crane untuk Ruang Kimia

Electric Motor Hoist crane, Kapasitas 1 ton, lengkap dengan


- set 1.00 4,038,302.40 4,038,302.40
span, flat bar, conductor dan pendant push button ( R.Kimia )

Electric Motor Hoist crane, Kapasitas 2 ton, lengkap dengan


- set 1.00 5,922,843.52 5,922,843.52
span, flat bar, conductor dan pendant push button ( R. Chlor )

2 Pompa Dosing dan pengaduk


Mixer 580 rpm, Drive: 4kW, 380V, dilengkapi dengan gear,
- reducer, stainless steel shaft set 4.00 3,230,641.92 12,922,567.68
support, control dan drain oil.
Pompa dozing alum Q = 250 l/jam; P=6,9 bar, Motor =
- unit 3.00 1,938,385.15 5,815,155.46
1,1kW, 380V, 3 phase
Pompa dosing soda ash Q = 450l/jam; P = 6,9 bar, Motor =
- unit 3.00 1,938,385.15 5,815,155.46
0,55kW, 380V, 3 phase
Jumlah 34,514,024.51
c Pengadaan Elektrikal dan aksesoris
1 Panel utama / control Pompa Dosing Kimia (M-PK)
- Box Panel Pompa Air Bersih unit 1.00 3,850,000.00 3,850,000.00
- Bus Bar 3P+N/125A +PE dan acessories set 1.00 1,615,320.96 1,615,320.96
- MCCB 3P(100-125)A 36KA + electronic trip set 1.00 3,647,394.73 3,647,394.73
MCCB 3P(252-630)A 50KA + Micrologic 2,0 manually
- set 1.00 10,525,431.40 10,525,431.40
operated
- MCB 2P/25 A, 10 KA unit 2.00 117,568.00 235,136.00
- MCB 2P/16 A, 10 KA unit 1.00 117,568.00 117,568.00
- MCB 4P/20 A, 10 KA unit 1.00 253,506.00 253,506.00
Relay arus bocor (Modul Vigi) 4P, 40A, Sensitivitas = 300
- unit 1.00 269,500.00 269,500.00
mA
- MCB 3P/20 A, 10 KA unit 1.00 190,129.50 190,129.50
- MCB 3P/25 A, 10 KA unit 1.00 190,129.50 190,129.50
- Isolating switch, 380 V, 3P, 40A unit 2.00 436,136.66 872,273.31
- Voltmeter (0-500)V, Uk 72x72 unit 1.00 224,400.00 224,400.00
- VS (Voltage Selector switch, 7 posisi) unit 1.00 126,500.00 126,500.00
DOL Starting Motor 0.55kW, 3 komponen, type high
- set 4.00 499,290.00 1,997,160.00
performance
DOL Starting Motor 1.1 kW, 3 komponen, type high
- set 4.00 499,290.00 1,997,160.00
performance
DOL Starting Motor 4 kW, 3 komponen, type high
- set 4.00 653,070.00 2,612,280.00
performance
Fuse carrier (STI), 2P (1P + N), lengkap dengan tabung
- sekring (fuse catrige), type aM, Ukuran 10,3x38mm, 2A, set 12.00 305,295.66 3,663,547.93
500V, 80kA
- Buzzer, 70 dBA unit 1.00 20,350.00 20,350.00
RCP (Relay Control Phase) untuk unbalanced/missing phase 2
- unit 2.00 502,364.82 1,004,729.64
kontak output C/O, Delay (0.1-10) detik, (380-500)V
Plug in relay 220V, 14 pin, 4 kontak C/O, 5 amp, built in
- unit 24.00 46,750.00 1,122,000.00
pilot light, komplit dengan dudukan
- Water Level Control (WLC), Time delay (0.1-10)detik, sensitif unit 4.00 330,000.00 1,320,000.00
- Pilot lamp, Ø 22 mm plastic 220-240 VAC unit 36.00 8,800.00 316,800.00
- Push button Ø 22 mm flush, plastic (reset) unit 2.00 42,900.00 85,800.00
Plug dan Socket 2P + E 16A, 220 VAC, Panel mounted,
- set 1.00 237,452.18 237,452.18
komplit
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 220 VAC, Panel mounted,
Plug dan Socket 2P + E 16A, 3 4 5 6
- set 1.00 237,452.18 237,452.18
komplit
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
Plug dan Socket 3P + N + E 16A, 380 VAC, Panel mounted,
- set 1.00 237,452.18 237,452.18
komplit

- Box Plate metal, 2100x800x600 mm, Floor Standing Unit 1.00 12,684,980.00 12,684,980.00

- MCCB 3 POLE, 250 A Unit 1.00 10,876,250.00 10,876,250.00


- MCCB 3 POLE, 80 A Unit 1.00 2,203,740.00 2,203,740.00
- MCB 3 POLE, 6 A Unit 8.00 1,315,776.00 10,526,208.00
- MCB 3 POLE, 10 A Unit 4.00 1,315,776.00 5,263,104.00
- MCB 2 POLE, 6 A Unit 2.00 982,058.00 1,964,116.00
- MCB 1P/6A 6 KA Unit 3.00 40,414.00 121,242.00
- Indicator Lamp R, S, T Unit 3.00 63,140.00 189,420.00
Fuse carrier (STI), 2P (1P + N), lengkap dengan tabung
- sekring (fuse catrige), type aM, Ukuran 10,3x38mm, 2A, Unit 3.00 305,295.66 915,886.98
500V, 80kA

- Current Transformator 250/5 A Unit 3.00 833,294.00 2,499,882.00


- Contacor LC1D09 Unit 12.00 321,860.00 3,862,320.00
- Thermal Overload LRD06 Unit 4.00 975,282.00 3,901,128.00
- VSD 380/3P Unit 8.00 13,090,000.00 104,720,000.00
- Power Supply DC 220VAC / 24VDC 10A Unit 1.00 6,012,930.00 6,012,930.00
- Illuminated Push Button Red, 220VAC Unit 14.00 475,860.00 6,662,040.00
- Illuminated Push Button Green, 220VAC Unit 14.00 475,860.00 6,662,040.00
- Indicator Lamp Yellow, 220VAC Unit 14.00 63,140.00 883,960.00
- Push Button Unit 1.00 63,140.00 63,140.00
- Buzzer, 70 dBA Unit 1.00 20,350.00 20,350.00
- Emergency Stop Unit 1.00 396,242.00 396,242.00
Plug in relay 220V, 14 pin, 4 kontak C/O, 5 amp, built in
- Unit 24.00 46,750.00 1,122,000.00
pilot light, komplit dengan dudukan
- Exhaust Fan 6" Unit 2.00 2,885,344.00 5,770,688.00
- Dust Filter Unit 4.00 634,942.00 2,539,768.00
- Perakitan dan Pemasangan lengkap termasuk aksesoris Unit 1.00 807,660.48 807,660.48
###
2 Panel Penerangan Ruang Kimia (PP-RK) ###

- Box Plastic mini pragma pintu tranparant, inbow, 24 modul unit 1.00 297,880.00 297,880.00

- MCB 3P/16A 10 KA unit 1.00 190,129.50 190,129.50


- RCCB/ELCB, 4P, 25A, Sensitifitas : 30 mA unit 1.00 568,551.50 568,551.50
- MCB 1P/6A 6 KA unit 3.00 40,414.00 121,242.00
- MCB 1P/10A 6 KA unit 1.00 40,414.00 40,414.00

- Box Plate metal, 600x500x200 mm, Wall Mounting unit 1.00 4,620,000.00 4,620,000.00

- MCB 3P/6A, 6 KA unit 1.00 1,315,776.00 1,315,776.00


- RCCB/ELCB, 4P, 10A, Sensitifitas : 30 mA unit 1.00 930,160.00 930,160.00
- MCB 1P/4A 6 KA unit 5.00 161,700.00 808,500.00
- MCB 1P/6A 6 KA unit 1.00 40,414.00 40,414.00
- MCB 3P/4A 6 KA unit 1.00 1,547,700.00 1,547,700.00
- Time Switch 24 Jam unit 1.00 1,319,472.00 1,319,472.00
- Magnetic Contactor 10A unit 1.00 1,391,852.00 1,391,852.00
- Indicator Lamp R, S, T unit 3.00 63,140.00 189,420.00
- Mini Fuse 2A unit 4.00 140,756.00 563,024.00
- Selector Switch 3 Posisi unit 1.00 342,034.00 342,034.00
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 807,660.48 807,660.48
###
3 Penerangan Ruang Kimia ###
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 15.00 396,000.00 5,940,000.00
- Single switch 10 A/ 220V plano unit 6.00 18,700.00 112,200.00
- Double Switch 10 A/ 220V plano unit 3.00 23,100.00 69,300.00
- Outlet 10A/2P+E, 220V, WP (water proof) unit 3.00 253,605.40 760,816.19
- Kabel NYM 3 x 2,5 mm2 m 100.00 14,300.00 1,430,000.00
- uPVC Conduit 20 mm m 75.00 8,635.00 647,625.00
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
- Lampu TL WP 2 X 18 watt Unit 12.00 65,450.00 785,400.00
- Lampu TL WP 2 X 36 watt Unit 14.00 65,450.00 916,300.00
- Lampu DL 1 X 20watt Unit 1.00 65,450.00 65,450.00
- Outlet 10 A/2P+E 220V Unit 1.00 170,940.00 170,940.00
- Stop kontak AC Unit 1.00 38,500.00 38,500.00
- Double Switch 10 A/ 220V plano Unit 4.00 23,100.00 92,400.00
- Single switch 10 A/ 220V plano Unit 2.00 18,700.00 37,400.00
- Instalasi titik lampu Titik 27.00 589,050.00 15,904,350.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Instalasi stop kontak Titik 2.00 392,700.00 785,400.00
- Kabel dari Panel Penerangan R. Kimia ke P. Kimia ###
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- - NYY 4 x 2,5 mm2 meter 10.00 52,360.00 523,600.00
- - BC 4 mm2 meter 10.00 31,416.00 314,160.00
4 Penangkal Petir Bangunan Kimia ###
- Penangkal Petir type Elctrode dengan Rmin = 60m LS 1.00 10,822,650.43 10,822,650.43
- BC 50 mm2 m 82.00 54,450.00 4,464,900.00
- Clamp BC, 50 mm2 unit 425.00 40,383.02 17,162,785.20
- Air terminal Ø 1, termasuk dudukan, komplit set 12.00 686,511.41 8,238,136.90
- GIP Ø 2 termasuk socket set 4.00 662,281.60 2,649,126.39
- Grounding rod 3/4 set 4.00 282,681.17 1,130,724.67
- Grounding rod 3/4 set 1.00 282,681.17 282,681.17
- Pipa PVC Ø 1, termasuk clamp set 4.00 290,757.78 1,163,031.10
- Box control 30x30x70 cm LS 1.00 848,043.50 848,043.50
- - NYA 50 mm2 meter 30.00 150,150.00 4,504,500.00
- GIP Ø 3 termasuk socket meter 1.00 770,000.00 770,000.00
5 Peralatan elektroklorinasi ###

Onsite Chlorine Disinfectant Generator kap. 4 kg.Cl/jam,


- Unit 1.00 2,435,400,000.00 2,435,400,000.00
termasuk sel elektroda, power module, dan terminal control

- Inline water filter kap. 4 m3/jam, tekanan kerja 3-6 bar Unit 1.00 42,240,000.00 42,240,000.00

- Water softener dg hardness monitoring system Unit 1.00 17,600,000.00 17,600,000.00


- Water chiller system, termasuk power control Unit 1.00 105,600,000.00 105,600,000.00
Submersible pump kap. 2500 L/jam, tekanan 5 bar, termasuk
- Unit 1.00 35,200,000.00 35,200,000.00
power control

HDPE Brine tank kap. 4 m3, termasuk drain, corong inlet


- garam, soft water inlet with automated magnetic valve, brine Unit 1.00 35,200,000.00 35,200,000.00
outlet, overflow

HDPE brine tnak kap. 0,5 m3, termasuk inlet, outlet, drain, dan
- Unit 1.00 8,800,000.00 8,800,000.00
overflow

Brine dosing pump, kap. Min. 100 L/jam, tekanan 5 bar,


- termasuk control panel, push button, indicator light, integrated Unit 2.00 52,800,000.00 105,600,000.00
control ready

HDPE Production tank 30 m3, dilengkapi dengan water level


- Unit 1.00 457,600,000.00 457,600,000.00
sensor
- Power stabiliser kap. 30 kVA Unit 1.00 17,160,000.00 17,160,000.00
Jumlah 3,583,560,966.83
d Pemasangan Elektrikal dan aksesoris -
1 Panel utama / control Pompa Dosing Kimia (M-PK) -

- Perakitan dan Pemasangan lengkap termasuk aksesoris set 1.00 807,660.48 807,660.48

2 Panel Penerangan Ruang Kimia (PP-RK)

- Perakitan dan Pemasangan lengkap termasuk aksesoris set 1.00 807,660.48 807,660.48

3 Penerangan Ruang Kimia


- Lampu philips 2 x 18W/220V, WP (Water proof) unit 15.00 40,370.00 605,550.00
- Outlet 10A/2P+E, 220V, WP (water proof) unit 3.00 24,200.00 72,600.00
Exhaust fan, Industrial type, wall mounted, 16", komplit base
- set 2.00 242,220.00 484,440.00
frame
- Titik Lampu titik 15.00 72,689.44 1,090,341.62
4 Penangkal Petir Bangunan Kimia

- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 807,660.48 807,660.48

5 Peralatan elektroklorinasi
- Pemasangan perpipaan sistem elektroklorinasi LS 1.00 11,220,000.00 11,220,000.00
- Pemasangan pengkabelan sistem elektroklorinasi LS 1.00 22,000,000.00 22,000,000.00
- Pemasangan sistem pembubuhan larutan klorin LS 1.00 105,600,000.00 105,600,000.00
Pemrograman sistem kendali setempat dan kendali jarak jauh,
- LS 1.00 49,280,000.00 49,280,000.00
berikut piranti lunak

Pengujian komisioning dan pelatihan minimal 5 hari, termasuk


- LS 1.00 24,640,000.00 24,640,000.00
dokumentasi dan manual operasi pemeliharaan

Jumlah 217,415,913.06

- PEKERJAAN MEKANIKAL DAN ELEKTRIKAL BANGUNAN GENSET 4,545,303,911.16


a Pengadaan Mekanikal dan Accessories

Generator set, Kapasitas: 1000 kW, 380/220V, komplit tangki harian


1 dengan perpipaan, kontrol panel PCC, karet peredam getaran, peredam set 1 2,608,743,350.40 2,608,743,350.40
suara dan kelengkapan lainnya (Lihat spesifikasi khusus)
HARGA SATUAN JUMLAH
NO U R A I1000
Generator set, Kapasitas: A N kW,
P E380/220V,
K E R J komplit
A A N tangki harian SAT. VOLUME
( Rp ) ( Rp )
1 dengan perpipaan, kontrol panel PCC, karet peredam getaran, peredam set 1 2,608,743,350.40 2,608,743,350.40
1 2 spesifikasi khusus)
suara dan kelengkapan lainnya (Lihat 3 4 5 6
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
Fuel Storage tank procurement cap. of 5.000 lt termasuk Suporting
2 material, termasuk perpipaan, strainer, level switch pada control panel unit 1 123,572,053.44 123,572,053.44
bahan bakar, pompa tangan, electric pump dll.
Pengadaan dan pemasangan Rock Wool, tebal 5cm (2") pada dinding
dalam Ruangan, Kawat anyaman galvanized untuk pelindung bahan
3 Glass wool dan kain pembungkus tahan api m2 135.55 383,638.73 52,002,229.58
Generator set, lengkap dengan pelidung kain Catton tebal dan kawat
Ram.
Jumlah 2,784,317,633.42
b Pemasangan Makanikal dan Accessories
Generator set, Kapasitas: 1000 kW, 380/220V, komplit tangki harian
1 dengan perpipaan, kontrol panel PCC, karet peredam getaran, peredam set 1 67,843,480.32 67,843,480.32
suara dan kelengkapan lainnya (Lihat spesifikasi khusus)

Fuel Storage tank procurement cap. of 5.000 lt termasuk Suporting


2 material, termasuk perpipaan, strainer, level switch pada control panel ls 1 4,038,302.40 4,038,302.40
bahan bakar, pompa tangan, electric pump dll.

Jumlah 71,881,782.72
c Pengadaan Elektrikal dan Accessories
1 Trafo dan panel TM
- Trafo 1250 kVA, 20kV/380-220V, Dyn 5, dan kelengkapannya. set 1.00 428,574,974.67 428,574,974.67
Panel Tegangan Menengah (cubicle) 24 kV, incoming dan
- set
outgoing with circuit breaker 1.00 239,800,000.00 239,800,000.00
2 Panel Automatic Main Failure (AMF) dan Change Over Switch (COS)
Panel Automatic Main Failure untuk Genset Cap 1250 KvA,
- 1.00 444,213,264.00
dengan PCC set 444,213,264.00
Change Over Switch untuk kapasitas daya 1500 KvA, plus
- 1.00
interlock system set 6,970,109.94 6,970,109.94
- Box Panel, ukuran T:1800 X L:800 X D:600, free standing type set 1.00 3,850,000.00 3,850,000.00
3 Panel Induk Utama, LVM-DP
- Box Plate metal, 2000x(800+800+800)x1000 mm, Floor Standin unit 1.00 3,850,000.00 3,850,000.00
- Bus Bar 3P+N/2000A + PE dan accessories set 1.00 6,978,186.55 6,978,186.55
ACB 4P/(640-2000)A 50KA (Min) dilengkapi dengan unit trip
- Motor mechanism module 220/240V AC dan kontak-kontak set 1.00 9,058,500.00 9,058,500.00
bantu (Lihat spek khusus)

- MCCB 4P(25-40)A 25KA + electronic trip ke Kantor pengelola set 1.00 2,162,050.00 2,162,050.00
- MCCB 3P(13-16)A 25KA + electronic trip ke PP. R Genset + P set 1.00 2,162,050.00 2,162,050.00
- Pilot lamp, Ø 22mm, plastic 220-240 VAC set 8.00 8,800.00 70,400.00
- Push button modular plastic 220-240 VAC set 4.00 42,900.00 171,600.00
Accessories penunjang termasuk relay bantu, isolator kabel-
- kabel, terminal, fuse, ls 1.00 1,211,490.72 1,211,490.72
supporting fanel dll sebagai pelengkap system
- Kapasitor bank, komplit lamp, push button (500 kvar) (LVMDP set 1.00 250,232,730.00 250,232,730.00
- MCCB 3 POLE, 1000 A Unit 1.00 46,200,000.00 46,200,000.00
- MCCB 3 POLE, 160 A Unit 1.00 10,876,250.00 10,876,250.00
- MCB 1P/6A 6 KA Unit 6.00 40,414.00 242,484.00
- Mini Fuse Unit 6.00 140,756.00 844,536.00
Plug in relay 220V, 14 pin, 4 kontak C/O, 5 amp, built in
- Unit 10.00 46,750.00 467,500.00
pilot light, komplit dengan dudukan
- Indikator Lamp, Pilot Lamp Ø22mm, 220V Unit 8.00 77,000.00 616,000.00
- Illuminated Push Button, 220VAC Unit 4.00 475,860.00 1,903,440.00
- Power Meter Digital Unit 1.00 1,848,000.00 1,848,000.00
- Current Transformator 2000/5A Unit 6.00 4,383,918.00 26,303,508.00
- Selector Switch 3 Posisi Unit 2.00 342,034.00 684,068.00
- Box Plate metal, 500 x 400 200 mm, Wall Mounting Unit 1.00 3,518,592.00 3,518,592.00
4 Panel Penerangan Ruang Listrik Utama (PP-RL)
- Box Plastic mini pragma pintu tranparant, inbow, 24 modul unit 1.00 297,880.00 297,880.00
- MCB 3P/16A 10 KA unit 1.00 190,129.50 190,129.50
- RCCB/ELCB, 4P, 25A, Sensitifitas : 30 mA unit 1.00 568,551.50 568,551.50
- MCB 1P/6A 6 KA unit 3.00 40,414.00 121,242.00
- MCB 1P/10A 6 KA unit 4.00 40,414.00 161,656.00
- Box Plate metal, 600x500x200 mm, Wall Mounting unit 1.00 4,620,000.00 4,620,000.00
- MCB 3P/6A, 6 KA unit 1.00 1,315,776.00 1,315,776.00
- RCCB/ELCB, 4P, 10A, Sensitifitas : 30 mA unit 1.00 930,160.00 930,160.00
- MCB 1P/4A 6 KA unit 15.00 161,700.00 2,425,500.00
- Time Switch 24 Jam unit 1.00 1,319,472.00 1,319,472.00
- Magnetic Contactor 10A unit 1.00 1,391,852.00 1,391,852.00
- Indikator Lamp, Pilot Lamp Ø22mm, 220V unit 3.00 77,000.00 231,000.00
- Mini Fuse 2A unit 3.00 140,756.00 422,268.00
- Selector Switch 3 Posisi unit 1.00 342,034.00 342,034.00
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 807,660.48 807,660.48
5 Penerangan Ruang listrik utama
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 8.00 396,000.00 3,168,000.00
- Lampu philips 36W/220V, Industrial Type unit 1.00 284,296.49 284,296.49
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Lampu philips 2 x 36W/220V, Water proof unit 4.00 528,000.00 2,112,000.00
- Single switch 10 A/ 220V plano unit 6.00 18,700.00 112,200.00
- Double Switch 10 A/ 220V plano unit 2.00 23,100.00 46,200.00
- Outlet 10A / 220 V unit 2.00 92,073.30 184,146.60
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 2.00 253,605.40 507,210.79
- Kabel NYM 3 x 2,5 mm2 m 160.00 14,300.00 2,288,000.00
- uPVC Conduit 20 m m 140.00 8,635.00 1,208,900.00
- uPVC Conduit 25 m m 2.00 17,600.00 35,200.00
- Exhaust fan, Industrial type, wall mounted, 16", komplit base fr set 2.00 583,000.00 1,166,000.00
- Lampu TL / DL 2 X 18 watt unit 21.00 65,450.00 1,374,450.00
- Lampu PJU, 56 watt + timer unit 30.00 77,000.00 2,310,000.00
- Outlet 10 A/2P+E 220V unit 4.00 170,940.00 683,760.00
- Double Switch 10 A/ 220V plano unit 4.00 23,100.00 92,400.00
- Exhaust Fan 16 Inch, 80 watt ( 2 unit di R. panel LVMDP) unit 5.00 1,707,860.00 8,539,300.00
- Kabel penerangan ke PJU
- - NYFGBY 2 x 4 mm2 meter 612.00 43,274.00 26,483,688.00
- Kabel penerangan ke PJU
- - NYFGBY 2 x 2,5 mm2 meter 163.00 40,348.00 6,576,724.00
- Kabel dari LVMDP ke P. Penerangan R. Genset
- NYFGBY 4 x 6 mm2 meter 12.00 72,380.00 868,560.00
- - BC 4 mm2 meter 10.00 31,416.00 314,160.00
- MCB 4 Amp untuk tiap2 tiang lampu unit 10.00 266,112.00 2,661,120.00
- Instalasi titik lampu titik 21.00 589,050.00 12,370,050.00
- Intalasi titik lampu PJU titik 30.00 654,500.00 19,635,000.00
- Instalasi Stop kontak titik 4.00 392,700.00 1,570,800.00
- Instalasi exhaust fan titik 5.00 392,700.00 1,963,500.00
Jumlah 1,604,510,581.23
d Pengadaan Elektrikal dan Accessories
1 Trafo dan panel TM
- Trafo 1250 kVA, 20kV/380-220V, Dyn 5, dan kelengkapannya. set 1.00 12,276,439.30 12,276,439.30
Panel Tegangan Menengah (cubicle) 24 kV, incoming dan
- set 1.00 12,114,907.20 12,114,907.20
outgoing with circuit breaker
2 Panel Automatic Main Failure (AMF) dan Change Over Switch (COS) ###
Panel Automatic Main Failure untuk Genset Cap 1250 KvA,
- set - 8,076,604.80 -
dengan PCC
Change Over Switch untuk kapasitas daya 1500 KvA, plus
- set 1.00 48,459,628.80 48,459,628.80
interlock system
- Box Panel, ukuran T:1800 X L:800 X D:600, free standing type set 1.00 8,076,604.80 8,076,604.80
3 Panel Induk Utama, LVM-DP ###
- Perakitan dan Pemasangan lengkap termasuk aksesoris set 1.00 807,660.48 807,660.48
4 Panel Penerangan Ruang Listrik Utama (PP-RL)
- Perakitan dan Pemasangan lengkap termasuk aksesoris set 1.00 807,660.48 807,660.48
5 Penerangan Ruang listrik utama ###
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 8.00 40,370.00 322,960.00
- Lampu philips 36W/220V, Industrial Type unit 1.00 40,370.00 40,370.00
- Lampu philips 2 x 36W/220V, Water proof unit 4.00 40,370.00 161,480.00
- Outlet 10A / 220 V unit 2.00 24,200.00 48,400.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 2.00 24,200.00 48,400.00
Exhaust fan, Industrial type, wall mounted, 16", komplit base
- set 2.00 242,220.00 484,440.00
frame
- Titik lampu titik 13.00 72,689.44 944,962.73
Jumlah 84,593,913.79

- PEKERJAAN MEKANIKAL DAN ELEKTRIKAL BANGUNAN IPAL 25,104,485.82


Pengadaan / Pemasangan elektrikal dan aksesoris
Panel Penerangan Bangunan Worskshop, kantor dan Gudang
- Penangkal Petir type Elctrode dengan Rmin = 60m LS 1.00 10,822,650.43 10,822,650.43
- Grounding Anchor Rot 4 meter (3/4) unit 5.00 770,000.00 3,850,000.00
- - NYA 50 mm2 meter 10.00 150,150.00 1,501,500.00
- Clamp Anchor Rot 50 mm2 unit 2.00 16,940.00 33,880.00
- Air terminal Ø 1, termasuk dudukan, komplit set 1.00 686,511.41 686,511.41
- GIP Ø 3 unit 1.00 1,811,040.00 1,811,040.00
- GIP Ø 2 unit 1.00 123,200.00 123,200.00
- Box control 30x30x70 cm unit 1.00 848,043.50 848,043.50
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 807,660.48 807,660.48
- Pengesahan Depnaker LS 1.00 4,620,000.00 4,620,000.00
Jumlah 25,104,485.82
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6

- PEKERJAAN MEKANIKAL DAN ELEKTRIKAL BANGUNAN RESERVOIR KAPASITAS 3600 M3 9,721,131,713.42


a Pengadaan Mekanikal dan Accesories
1 Pompa dan Accessories
- Pompa Centifugal Q 10 l/dt - Head 100 m' 40 KW Efisiensi 75 Unit 2.00 130,396,200.00 260,792,400.00
- Kabel Power NYFGBY 4 x 300 mm m' 600.00 1,028,500.00 617,100,000.00
- Panel Pompa Variable Speed Drive Paralel Alternate 3 x 250 K set 1.00 1,694,880,000.00 1,694,880,000.00
- Panel Pompa Variable Speed Drive Paralel Alternate 2 x 250 K set 1.00 990,000,000.00 990,000,000.00
- Kabel Power NYFGBY 4 x 95 mm m' 75.00 335,500.00 25,162,500.00
- Skun Kabel 300 mm (Cu) set 24.00 93,500.00 2,244,000.00
- Skun Kabel 95 mm (Cu) set 24.00 21,450.00 514,800.00
- Pressure Transmiter Skala 0 - 15 Bar / 4 - 20 mA Unit 3.00 2,904,000.00 8,712,000.00
- Kabel Data 3 x 2,5 mm m' 30.00 36,300.00 1,089,000.00
- Electrode level set 3.00 330,000.00 990,000.00
2 Perpipaan Hisap (Suction) ###
- Ø 350 mm Strainer staenles steel fl unit 3.00 7,318,080.00 21,954,240.00
- Ø 350 mm x 0,60 m' Double fl - fl ( Wall pipa ) unit 3.00 5,108,400.00 15,325,200.00
- Ø 350 mm DI Gate Valve resilient seat unit 9.00 29,960,409.60 269,643,686.40
- Ø 700 mm Header Steel Pipe m' 18.00 5,626,698.00 101,280,564.00
- Ø 700 mm Flange las unit 6.00 3,190,000.00 19,140,000.00
- Ø 700 mm Blank Flange unit 6.00 14,320,152.00 85,920,912.00
- Ø 350 mm Steel pipa unit 9.00 3,363,656.73 30,272,910.53
- Ø 350 mm x Ø 250 mm Steel Concentris Reducer fl -fl unit 9.00 2,956,800.00 26,611,200.00
- Ø 250 mm Flexible Joint unit 9.00 3,033,676.80 27,303,091.20
- Ø 250 mm Flange buta lubang disesuaikan dengan Pompa unit 9.00 574,200.00 5,167,800.00
- Ø 350 mm Flange las unit 18.00 1,078,000.00 19,404,000.00
- Ø 250 mm Flange las unit 18.00 506,000.00 9,108,000.00
- Ø 700 mm Karet Packing unit 6.00 56,100.00 336,600.00
- Ø 350 mm Karet Packing unit 24.00 29,854.00 716,496.00
- Ø 250 mm Karet Packing unit 3.00 34,100.00 102,300.00
- 1" x 5" Baud mur unit 432.00 29,700.00 12,830,400.00
- 1 1/4" x 5" Baud mur unit 120.00 29,700.00 3,564,000.00
- Ø 400 mm x 0,60 m' ( Wall pipa ) unit 4.00 7,814,400.00 31,257,600.00
- Ø 400 mm Butterfly valve fl-fl resilient seat unit 7.00 66,813,120.00 467,691,840.00
- Ø 400 mm Flange Adaptor unit 4.00 4,950,000.00 19,800,000.00
- Ø 400 mm Flexible Joint unit 3.00 18,562,500.00 55,687,500.00
- Ø 400 mm x Ø 250 mm Steel Concentris Reducer fl -fl unit 3.00 4,356,000.00 13,068,000.00
- Ø 400 mm Flange las unit 19.00 748,000.00 14,212,000.00
- Ø 400 mm Karet Packing unit 25.00 35,816.00 895,400.00
- M24 Baud mur set 36.00 44,187.00 1,590,732.00
- M27 Baud mur set 400.00 48,605.70 19,442,280.00
- M39 Baud mur set 48.00 56,320.00 2,703,360.00
3 Perpipaan Tekan (Discharge) ###
- Ø 250 mm x Ø 200 Steel Reducer fl - fl unit 3.00 1,747,680.00 5,243,040.00
- Ø 250 mm Flange las m' 6.00 506,000.00 3,036,000.00
- Ø 250 mm x 750mm' Steel Double Flange (wall pipe) unit 3.00 1,842,720.00 5,528,160.00
- Ø 250 mm Steel pipa m' 18.00 1,136,190.00 20,451,420.00
- Ø 250 mm x 45 Steel Bend fl - fl unit 3.00 1,181,400.00 3,544,200.00
- Ø 250 mm DI Gate Valve PN 16 Resilien seat unit 6.00 17,582,400.00 105,494,400.00
- Ø 250 mm DI Cek Valve PN 16 Resilian seat unit 3.00 34,461,504.00 103,384,512.00
- Ø 250 mm Flexible Joint PN 16 unit 3.00 3,033,676.80 9,101,030.40
- Ø 250 mm Karet Packing unit 21.00 34,100.00 716,100.00
- Ø 200 mm Karet Packing unit 3.00 25,300.00 75,900.00
- 3/4" x 4" Baud Mur unit 288.00 22,275.00 6,415,200.00
- 12,5 mm x 0,50 Steel Pipa risser m' 3.00 44,770.00 134,310.00
- 12,5 mm Ball Valve unit 3.00 228,800.00 686,400.00
- Manometer Scala 0 - 15 Kg/cm2 unit 3.00 200,112.00 600,336.00
- 12,5 mm x 90 GWI Bend unit 2.00 10,454.40 20,908.80
- 12,5 mm x 12,5 mm GWI Tee unit 1.00 11,880.00 11,880.00
- Ø 300 mm Butterfly valve fl-fl resilient seat unit 3.00 39,182,170.50 117,546,511.50
- Ø 300 mm Flange Adaptor unit 3.00 1,839,200.00 5,517,600.00
- Ø 300 mm Flexible Joint unit 3.00 6,435,000.00 19,305,000.00
- Ø 300 mm x Ø 200 mm Steel Reducer fl -fl unit 3.00 2,718,144.00 8,154,432.00
- Ø 300 mm x 45 Steel Bend fl - fl unit 3.00 1,155,000.00 3,465,000.00
- Ø 300 mm Flange las unit 3.00 880,000.00 2,640,000.00
- Ø 300 mm Karet Packing unit 18.00 36,850.00 663,300.00
- M24 Baud mur set 216.00 44,187.00 9,544,392.00
- M20 Baud mur set 36.00 39,768.30 1,431,658.80
- Ø 700 mm DI Gate Valve metal resilient Seated all flange unit 1.00 133,626,240.00 133,626,240.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Ø 700 mm DI Cek Valve PN 16 Resilian seat unit 1.00 176,000,210.10 176,000,210.10
- Box Uk. 2,4x 1,5 x 1,5 m' unit 2.00 14,437,500.00 28,875,000.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
4 Perpipaan Pengumpul (Header) ###
- Ø 700 mm Header Steel Pipe m' 10.50 5,626,698.00 59,080,329.00
- Ø 700 mm x Ø 500 mm Steel Reducer flange - flange unit 2.00 16,060,000.00 32,120,000.00
- Ø 700 mm Flange las unit 8.00 12,457,368.00 99,658,944.00
- Ø 700 mm Blank Flange unit 1.00 14,320,152.00 14,320,152.00
- Ø 500 mm x 90° Steel Bend flange - flange unit 1.00 6,177,600.00 6,177,600.00
- Ø 500 mm Flange las unit 3.00 4,311,014.40 12,933,043.20
- Ø 500 mm Steel Dresser Joint unit 1.00 11,864,160.00 11,864,160.00
- Box Water Meter Uk. 200 x 1,5 x 2,5 m' Unit 1.00 14,437,500.00 14,437,500.00
- Ø 500 mm x 0,60 m' Pipa Inlet ( Wall Pipe ) unit 3.00 4,745,216.30 14,235,648.90
- 1" x 5" Baud Mur set 80.00 29,700.00 2,376,000.00
- Ø 500 mm Karet Packing unit 2.00 42,988.00 85,976.00
- Ø 700 mm Karet Packing unit 2.00 56,100.00 112,200.00
- Ø 700 mm Karet Packing unit 7.00 56,100.00 392,700.00
- Ø 700 mm Steel Pipe m' 83.00 5,626,698.00 467,015,934.00
- Ø 700 mm x 45° Steel Bend flange - flange unit 2.00 9,735,000.00 19,470,000.00
- Ø 700 mm x 11.25° Steel Bend flange - flange unit 5.00 4,158,000.00 20,790,000.00
- M39 Baud mur set 216.00 56,320.00 12,165,120.00
5 Perpipaan Over Flow dan Penguras ###
- Ø 300 mm Overflow Steel Pipe m' 10.00 2,598,676.66 25,986,766.63
- Ø 300 mm Penguras Steel Pipe m' 82.00 2,598,676.66 213,091,486.37
- Ø 300 mm Penguras PVC m' 50.00 1,175,625.00 58,781,250.00
- Ø 200 mm Penguras PVC m' 71.50 404,250.00 28,903,875.00
- A.F. Gate Valve PN 10 Ø 300 mm unit 3.00 14,300,000.00 42,900,000.00
- Cek Valve Ø 300 mm Steel unit 2.00 18,231,731.10 36,463,462.20
- Cek Valve Ø 200 mm Steel unit 1.00 14,585,384.88 14,585,384.88
- Ø 300 mm Karet Packing unit 10.00 36,850.00 368,500.00
- Ø 200 mm Karet Packing unit 2.00 25,300.00 50,600.00
- Ø 300 mm Flange las unit 10.00 880,000.00 8,800,000.00
- Ø 200 mm Flange Las unit 2.00 453,200.00 906,400.00
- M24 Baud mur set 120.00 44,187.00 5,302,440.00
- M20 Baud mur set 24.00 39,768.30 954,439.20
6 Perpipaan Pompa Back wash Air dan Udara ###
- Ø 100 mm Steel pipe SCH 40 m' 31.50 712,031.56 22,428,994.20
- Ø 200 mm Steel pipe SCH 40 m' 31.50 895,803.34 28,217,805.12
- Ø 300 mm Steel pipe SCH 40 m' 6.00 2,598,676.66 15,592,059.98
- Ø 300 mm x Ø 200 mm Steel Reducer flange - flange unit 2.00 2,718,144.00 5,436,288.00
- Ø 200 mm x Ø 150 mm Steel Reducer flange - flange unit 2.00 990,000.00 1,980,000.00
- Ø 100 mm Butterfly valve seat fl-fl include actuator unit 4.00 4,158,000.00 16,632,000.00
- Ø 200 mm Butterfly valve Lengkap dengan Pneumatic unit 2.00 13,727,191.50 27,454,383.00
- Ø 200 mm flexsible joint unit 4.00 3,033,676.80 12,134,707.20
- Ø 300 mm Blank flange unit 2.00 1,485,000.00 2,970,000.00
- Ø 100 mm x 90° Steel Bend flange - flange unit 2.00 132,000.00 264,000.00
- Ø 200 mm x 90° Steel Bend flange - flange unit 6.00 1,438,968.96 8,633,813.76
- Ø 100 mm Flange las unit 4.00 205,920.00 823,680.00
- Ø 200 mm Flange las unit 22.00 412,500.00 9,075,000.00
- Ø 300 mm Flange las unit 2.00 880,000.00 1,760,000.00
- Ø 100 mm Karet Packing unit 4.00 9,680.00 38,720.00
- Ø 150 mm Karet Packing unit 2.00 16,500.00 33,000.00
- Ø 200 mm Karet Packing unit 22.00 25,300.00 556,600.00
- Ø 300 mm Karet Packing unit 4.00 36,850.00 147,400.00
- M16 Baud mur set 32.00 29,458.00 942,656.00
- M20 Baud mur set 288.00 39,768.30 11,453,270.40
- M24 Baud mur set 48.00 44,187.00 2,120,976.00
7 Perpipaan Hydrophore ###
- Ø 500 mm Steel pipe SCH 40 unit 17.00 2,788,646.66 47,406,993.27
- Ø 700 mm x Ø 500 mm Steel Reducer flange - flange unit 1.00 9,529,977.60 9,529,977.60
- Ø 700 mm x Ø 700 Tee y flange - flange unit 1.00 5,362,500.00 5,362,500.00
- Ø 500 mm x 90° Steel Bend flange - flange unit 6.00 6,177,600.00 37,065,600.00
- Ø 500 mm x 45° Steel Bend flange - flange unit 1.00 6,210,600.00 6,210,600.00
- Gate Valve Ø 500 mm Resellient seat lengkap dengan floor unit 2.00 105,494,400.00 210,988,800.00
- Ø 500 mm Flange las unit 10.00 4,311,014.40 43,110,144.00
- Ø 500 mm Karet Packing unit 8.00 42,988.00 343,904.00
- M30 Baud mur set 160.00 51,036.70 8,165,872.00
- Ø 100 mm Steel pipe SCH 40 m' 40.00 712,031.56 28,481,262.48
- Check Valve Ø 100 mm unit 2.00 3,960,000.00 7,920,000.00
- Realase Valve Ø 75 mm unit 2.00 2,420,000.00 4,840,000.00
- Manometer Scala 0 - 15 Kg/cm2 unit 2.00 200,112.00 400,224.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
8 Sarana Prasarana ###
- Electric Motor Hoist kapasitas 5 Ton Horizontal dan Vertical, l unit 1.00 77,880,000.00 77,880,000.00
- Electric Motor Hoist crane, Kapasitas 2 ton, lengkap dengan span, set 1.00 45,424,896.00 45,424,896.00
- Pengadaan dan Pemasangan Extended Stem Valve set 3.00 2,383,562.50 7,150,687.50
- IWF Baja 150 x 300 mm Kg 480.00 - -
- Tangki air vessel Kapasitas L 10 m3, Tekanan 16kg/cm2, dilen set 2.00 565,362,336.00 1,130,724,672.00
Jumlah 8,711,759,351.61

b Pemasangan Mekanikal dan Accesories 0


1 Pompa dan Accessories 0
- Pompa Centifugal Q 20 l/dt - Head 150 m' 40 KW Efisiensi 75 Unit 2.00 9,691,925.10 19,383,850.20
- Kabel Power NYFGBY 4 x 300 mm m' 490.00 31,680.00 15,523,200.00
- Panel Pompa Variable Speed Drive Paralel Alternate 3 x 250 K set 1.00 16,500,000.00 16,500,000.00
- Panel Pompa Variable Speed Drive Paralel Alternate 2 x 250 K set 1.00 16,500,000.00 16,500,000.00
- Kabel Power NYFGBY 4 x 95 mm m' 75.00 27,500.00 2,062,500.00
- Skun Kabel 300 mm (Cu) set 24.00 5,500.00 132,000.00
- Skun Kabel 95 mm (Cu) set 24.00 5,500.00 132,000.00
- Pressure Transmiter Skala 0 - 15 Bar / 4 - 20 mA Unit 3.00 16,500.00 49,500.00
- Kabel Data 3 x 2,5 mm m' 30.00 5,500.00 165,000.00
- Electrode level set 3.00 82,500.00 247,500.00
2 Perpipaan Hisap (Suction) ###
- Ø 350 mm Strainer staenles steel fl unit 3.00 129,827.50 389,482.50
- Ø 350 mm x 0,60 m' Double fl - fl ( Wall pipa ) unit 3.00 129,910.00 389,730.00
- Ø 350 mm DI Gate Valve resilient seat unit 9.00 215,176.50 1,936,588.50
- Ø 700 mm Header Steel Pipe m' 11.50 386,455.10 4,444,233.67
- Ø 700 mm Flange las unit 6.00 1,166,411.13 6,998,466.75
- Ø 700 mm Blank Flange unit 6.00 1,166,411.13 6,998,466.75
- Ø 350 mm Steel pipa unit 9.00 21,896.31 197,066.83
- Ø 350 mm x Ø 250 mm Steel Concentris Reducer fl -fl unit 9.00 99,253.00 893,277.00
- Ø 250 mm Flexible Joint unit 9.00 86,102.50 774,922.50
- Ø 250 mm Flange buta lubang disesuaikan dengan Pompa unit 9.00 446,922.44 4,022,301.99
- Ø 350 mm Flange las unit 18.00 521,723.13 9,391,016.25
- Ø 250 mm Flange las unit 18.00 446,922.44 8,044,603.97
- Ø 400 mm x 0,60 m' ( Wall pipa ) unit 4.00 139,975.00 559,900.00
- Ø 400 mm Butterfly valve fl-fl resilient seat unit 7.00 215,336.00 1,507,352.00
- Ø 400 mm Flange Adaptor unit 4.00 680,927.50 2,723,710.00
- Ø 400 mm Flexible Joint unit 3.00 680,927.50 2,042,782.50
- Ø 400 mm x Ø 250 mm Steel Concentris Reducer fl -fl unit 3.00 226,336.00 679,008.00
- Ø 400 mm Flange las unit 19.00 680,927.50 12,937,622.50
- Ø 400 mm Karet Packing unit 25.00 1,561.66 39,041.41
- Ø 700 mm Karet Packing unit 2.00 1,561.66 3,123.31
- Ø 250 mm Karet Packing unit 3.00 1,561.66 4,684.97
- M24 Baud mur set 36.00 892.38 32,125.50
- M27 Baud mur set 400.00 892.38 356,950.00
- M39 Baud mur set 48.00 892.38 42,834.00
3 Perpipaan Tekan (Discharge) ###
- Ø 250 mm x Ø 200 Steel Reducer fl - fl unit 3.00 100,397.00 301,191.00
- Ø 250 mm Flange las m' 6.00 446,922.44 2,681,534.66
- Ø 250 mm x 750mm' Steel Double Flange (wall pipe) unit 3.00 96,932.00 290,796.00
- Ø 250 mm Steel pipa m' 18.00 15,242.36 274,362.46
- Ø 250 mm x 45 Steel Bend fl - fl unit 3.00 96,932.00 290,796.00
- Ø 250 mm DI Gate Valve PN 16 Resilien seat unit 6.00 214,901.50 1,289,409.00
- Ø 250 mm DI Cek Valve PN 16 Resilian seat unit 3.00 214,901.50 644,704.50
- Ø 250 mm Flexible Joint PN 16 unit 3.00 86,102.50 258,307.50
- 12,5 mm x 0,50 Steel Pipa risser m' 3.00 5,685.39 17,056.18
- 12,5 mm Ball Valve unit 3.00 5,685.39 17,056.18
- Manometer Scala 0 - 15 Kg/cm2 unit 3.00 5,685.39 17,056.18
- 12,5 mm x 90 GWI Bend unit 2.00 5,685.39 11,370.79
- 12,5 mm x 12,5 mm GWI Tee unit 1.00 5,685.39 5,685.39
- Ø 300 mm Butterfly valve fl-fl resilient seat unit 3.00 215,077.50 645,232.50
- Ø 300 mm Flange Adaptor unit 3.00 88,951.50 266,854.50
- Ø 300 mm Flexible Joint unit 3.00 521,723.13 1,565,169.38
- Ø 300 mm x Ø 200 mm Steel Reducer fl -fl unit 3.00 129,827.50 389,482.50
- Ø 300 mm x 45 Steel Bend fl - fl unit 3.00 136,620.00 409,860.00
- Ø 300 mm Flange las unit 3.00 521,723.13 1,565,169.38
- Ø 300 mm Karet Packing unit 18.00 521,723.13 9,391,016.25
- M24 Baud mur set 216.00 521,723.13 112,692,195.00
- M20 Baud mur set 36.00 521,723.13 18,782,032.50
Ø 700 mm DI Gate Valve metal resilient Seated all flange unit 1.00 283,041.00 283,041.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
Ø 700 mm DI Cek Valve PN 16 Resilian seat unit 1.00 283,041.00 283,041.00
Box Uk. 2,4x 1,5 x 1,5 m' unit 2.00 12,375,004.40 24,750,008.80
Ø 200 mm Karet Packing unit 3.00 1,561.66 4,684.97
4 Perpipaan Pengumpul (Header) ###
- Ø 700 mm Header Steel Pipe m' 10.50 386,455.10 4,057,778.57
- Ø 700 mm x Ø 500 mm Steel Reducer flange - flange unit 2.00 136,620.00 273,240.00
- Ø 700 mm Flange las unit 8.00 1,166,411.13 9,331,289.00
- Ø 700 mm Blank Flange unit 1.00 1,166,411.13 1,166,411.13
- Ø 500 mm x 90° Steel Bend flange - flange unit 1.00 113,300.00 113,300.00
- Ø 500 mm Flange las unit 3.00 845,607.82 2,536,823.45
- Ø 500 mm Steel Dresser Joint unit 1.00 104,489.00 104,489.00
- Box Water Meter Uk. 200 x 1,5 x 2,5 m' Unit 1.00 12,375,004.40 12,375,004.40
- Ø 500 mm x 0,60 m' Pipa Inlet ( Wall Pipe ) unit 3.00 139,975.00 419,925.00
- Ø 700 mm Steel Pipe m' 63.00 386,455.10 24,346,671.43
- Ø 700 mm x 45° Steel Bend flange - flange unit 2.00 159,527.01 319,054.01
- Ø 700 mm x 11.25° Steel Bend flange - flange unit 5.00 159,527.01 797,635.03
- M39 Baud mur set 216.00 892.38 192,753.00
- Ø 700 mm Karet Packing unit 9.00 1,561.66 14,054.91
5 Perpipaan Over Flow dan Penguras ###
- Ø 300 mm Overflow Steel Pipe m' 10.00 196,303.35 1,963,033.49
- Ø 300 mm Penguras Steel Pipe m' 82.00 196,303.35 16,096,874.62
- Ø 300 mm Penguras PVC m' 50.00 43,753.26 2,187,663.19
- Ø 200 mm Penguras PVC m' 71.50 43,753.26 3,128,358.37
- A.F. Gate Valve PN 10 dia. 300 mm unit 3.00 215,077.50 645,232.50
- Cek Valve Ø 300 mm Steel unit 2.00 215,077.50 430,155.00
- Cek Valve Ø 200 mm Steel unit 1.00 214,901.50 214,901.50
- Ø 300 mm Karet Packing unit 10.00 214,901.50 2,149,015.00
- Ø 200 mm Karet Packing unit 2.00 214,901.50 429,803.00
- Ø 300 mm Flange Las unit 10.00 521,723.13 5,217,231.25
- Ø 200 mm Flange Las unit 2.00 367,518.25 735,036.50
- M24 Baud mur set 120.00 892.38 107,085.00
- M20 Baud mur set 24.00 892.38 21,417.00
6 Perpipaan Pompa Back wash Air dan Udara ###
- Ø 100 mm Steel pipe SCH 40 m' 31.50 6,059.96 190,888.58
- Ø 200 mm Steel pipe SCH 40 m' 31.50 12,286.29 387,017.98
- Ø 300 mm Steel pipe SCH 40 m' 6.00 196,303.35 1,177,820.09
- Ø 300 mm x Ø 200 mm Steel Reducer flange - flange unit 2.00 129,827.50 259,655.00
- Ø 200 mm x Ø 150 mm Steel Reducer flange - flange unit 2.00 100,397.00 200,794.00
- Ø 100 mm Butterfly valve seat fl-fl include actuator unit 4.00 85,800.00 343,200.00
- Ø 200 mm Butterfly valve Lengkap dengan Pneumatic unit 2.00 214,901.50 429,803.00
- Ø 200 mm flexsible joint unit 4.00 214,901.50 859,606.00
- Ø 300 mm Blank flange unit 2.00 521,723.13 1,043,446.25
- Ø 100 mm x 90° Steel Bend flange - flange unit 2.00 77,407.00 154,814.00
- Ø 200 mm x 90° Steel Bend flange - flange unit 6.00 87,609.50 525,657.00
- Ø 100 mm Flange las unit 4.00 215,392.38 861,569.50
- Ø 200 mm Flange las unit 22.00 367,518.25 8,085,401.50
- Ø 300 mm Flange las unit 2.00 521,723.13 1,043,446.25
- Ø 100 mm Karet Packing unit 4.00 1,561.66 6,246.63
- Ø 150 mm Karet Packing unit 2.00 1,561.66 3,123.31
- Ø 200 mm Karet Packing unit 22.00 1,561.66 34,356.44
- Ø 300 mm Karet Packing unit 4.00 1,561.66 6,246.63
- M16 Baud mur set 32.00 892.38 28,556.00
- M20 Baud mur set 288.00 892.38 257,004.00
- M24 Baud mur set 48.00 892.38 42,834.00
7 Perpipaan Hydrophore ###
- Ø 500 mm Steel pipe SCH 40 m' 17.00 33,163.22 563,774.71
- Ø 700 mm x Ø 500 mm Steel Reducer flange - flange unit 1.00 226,336.00 226,336.00
- Ø 700 mm x Ø 700 Tee y flange - flange unit 1.00 494,587.50 494,587.50
- Ø 500 mm x 90° Steel Bend flange - flange unit 6.00 113,300.00 679,800.00
- Ø 500 mm x 45° Steel Bend flange - flange unit 1.00 113,300.00 113,300.00
- Gate Valve Ø 500 mm Resellient seat lengkap dengan floor unit 2.00 231,170.50 462,341.00
- Ø 500 mm Flange las unit 10.00 845,607.82 8,456,078.18
- Ø 500 mm Karet Packing unit 8.00 1,561.66 12,493.25
- M30 Baud mur set 160.00 892.38 142,780.00
- Ø 100 mm Steel pipe SCH 40 m' 40.00 6,059.96 242,398.20
- Check Valve Ø 100 mm unit 2.00 85,800.00 171,600.00
- Realase Valve Ø 75 mm unit 2.00 85,800.00 171,600.00
- Manometer Scala 0 - 15 Kg/cm2 unit 2.00 5,685.39 11,370.79
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
8 Sarana Prasarana ###
- Electric Motor Hoist kapasitas 5 Ton Horizontal dan Vertical le unit 1.00 10,499,585.80 10,499,585.80
- Electric Motor Hoist crane, Kapasitas 2 ton, lengkap dengan span, set 1.00 332,145.00 332,145.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- IWF Baja 150 x 300 mm Kg 480.00 15,125.00 7,260,000.00
- Tangki air vessel Kapasitas L 10 m3, Tekanan 16kg/cm2, dilen set 2.00 1,650,000.00 3,300,000.00
Jumlah 451,687,866.63
###
c Pengadaan Elektrikal dan Accesories ###
1 Panel workshop (PK-WK) ###
- Box Panel Unit 1.00 687,500.00 687,500.00
- Bus Bar 3P+N/205A +PE dan acessories set 1.00 1,615,320.96 1,615,320.96
- MCCB 3P (100-125)A 36 KA + electronic trip set 1.00 3,647,394.73 3,647,394.73
- MCCB 3P (80-100)A 25 KA + electronic trip set 1.00 3,647,394.73 3,647,394.73
- MCB 3P/16A 10A unit 2.00 190,129.50 380,259.00
- MCB 3P/40A 10A unit 2.00 293,001.50 586,003.00
- MCB 3P/25A 10A unit 2.00 190,129.50 380,259.00
- MCB 3P/20A 10A unit 2.00 190,129.50 380,259.00
- Volt meter (0-500)V, Uk 72x72 unit 1.00 224,400.00 224,400.00
- VS (Voltage selector switch, 7 posisi) unit 1.00 126,500.00 126,500.00
- Plug dan Socket 2P + E 16A, 220 VAC, Panel mounted, komplit set 1.00 237,452.18 237,452.18
- Plug dan Socket 3P + N + E 16A, 380 VAC, Panel mounted, kom set 1.00 237,452.18 237,452.18
2 Panel Penerangan Ruang Kantor (PP-KR) ###
- Box plastic mini pragma pintu transparant, inbow, 36 modul unit 1.00 452,430.00 452,430.00
- MCB 3P/16A 10 KA unit 1.00 190,129.50 190,129.50
- RCCB/ELCB, 4P, 25A, Sensitifitas : 30 mA unit 1.00 568,551.50 568,551.50
- MCB 1P/6A 6 KA unit 3.00 40,414.00 121,242.00
- MCB 1P/10A 6 KA unit 7.00 40,414.00 282,898.00
- Box plastic mini pragma pintu transparant, inbow, 12 modul unit 1.00 308,000.00 308,000.00
- RCCB/ELCB, 4P, 16A, Sensitifitas : 30 mA unit 1.00 1,316,392.00 1,316,392.00
- MCB 3P, 32 Amp unit 1.00 700,700.00 700,700.00
- MCB 3P, 16 Amp unit 1.00 1,105,720.00 1,105,720.00
- MCB 1P/4A 6 KA unit 4.00 161,700.00 646,800.00
- MCB 1P/6A 6 KA unit 4.00 40,414.00 161,656.00
- MCB 1P/16A 6 KA unit 1.00 200,200.00 200,200.00
- Lampu TL / DL 2 X 18 watt Unit 15.00 65,450.00 981,750.00
- Lampu TL / DL 2 X 36 watt Unit 22.00 65,450.00 1,439,900.00
- Exhaust fan 40 watt Unit 2.00 439,824.00 879,648.00
- Outlet 10 A/2P+E 220V Unit 16.00 170,940.00 2,735,040.00
- Stop kontak AC Unit 4.00 38,500.00 154,000.00
- Double Switch 10 A/ 220V plano Unit 5.00 23,100.00 115,500.00
- Single switch 10 A/ 220V plano Unit 2.00 18,700.00 37,400.00
- Saklar Hotel Unit 1.00 329,868.00 329,868.00
- Instalasi titik lampu titik 12.00 589,050.00 7,068,600.00
- Instalasi stop kontak titik 20.00 392,700.00 7,854,000.00
- Instalasi exhaust fan titik 2.00 392,700.00 785,400.00
- Kabel dari Panel P. Lt 1 ke P. Penerangan R. Kimia ###
- NYFGBY 4 x 10 mm2 meter 45.00 174,944.00 7,872,480.00
- BC 4 mm2 meter 20.00 31,416.00 628,320.00
- Box plastic mini pragma pintu transparant, inbow, 12 modul unit 1.00 308,000.00 308,000.00
- RCCB/ELCB, 4P, 16A, Sensitifitas : 30 mA unit 1.00 1,316,392.00 1,316,392.00
- MCB 3P, 16 Amp unit 1.00 1,105,720.00 1,105,720.00
- MCB 1P/4A 6 KA unit 1.00 161,700.00 161,700.00
- MCB 1P/6A 6 KA unit 3.00 40,414.00 121,242.00
- MCB 1P/10A 6 KA unit 1.00 40,414.00 40,414.00
- MCB 1P/16A 6 KA unit 1.00 200,200.00 200,200.00
- Lampu TL / DL 1 X 32 watt Unit 11.00 65,450.00 719,950.00
- Exhaust fan 40 watt Unit 3.00 439,824.00 1,319,472.00
- Outlet 10 A/2P+E 220V Unit 11.00 170,940.00 1,880,340.00
- Stop kontak AC Unit 3.00 38,500.00 115,500.00
- Double Switch 10 A/ 220V plano Unit 5.00 23,100.00 115,500.00
- Single switch 10 A/ 220V plano Unit 3.00 18,700.00 56,100.00
- Saklar Hotel Unit 1.00 329,868.00 329,868.00
- Instalasi stop kontak titik 14.00 392,700.00 5,497,800.00
- Instalasi exhaust fan titik 3.00 392,700.00 1,178,100.00
- Kabel dari P. Penerangan Lt 2 ke P. Penerangan Lt. 1 ###
- NYY 4 x 4 mm2 meter 7.00 174,944.00 1,224,608.00
- BC 4 mm2 meter 7.00 31,416.00 219,912.00
- Skun Kabel 10 mm (Cu) set 4.00 231,000.00 924,000.00
- Skun Kabel 4 mm (Cu) set 6.00 100,100.00 600,600.00
3 Terminal board Grounding (1B-G) ###
- Box Panel unit 1.00 687,500.00 687,500.00
- Accessories penunjang termasuk busbar, isolator, supporting, dll LS 1.00 993,422.39 993,422.39
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
4 Panel Penerangan Lampu Luar Air Bersih (PP-LR3) ###
- Box Panel outdoor type unit 1.00 269,500.00 269,500.00
- MCB 3P/20A 6 KA unit 2.00 190,129.50 380,259.00
- Contactor, 3P, 32 A AC1, 380 V unit 1.00 396,550.00 396,550.00
- Photo cell unit 1.00 96,919.26 96,919.26
- MCB 1P/10A 6 KA unit 2.00 40,414.00 80,828.00
5 Panel penerangan Ruang Pompa Air Bersih (PP-AB) ###
- Box Plastic mini pragma pintu tranparant, inbow, 12 modul unit 1.00 186,780.00 186,780.00
- MCB 3P/16A 10 KA unit 1.00 190,129.50 190,129.50
- RCCB/ELCB, 4P, 25A, Sensitifitas : 30 mA unit 1.00 568,551.50 568,551.50
- MCB 1P/6A 6 KA unit 6.00 40,414.00 242,484.00
- MCB 1P/10A 6 KA unit 4.00 40,414.00 161,656.00
6 Penerangan Ruang Kantor/ Laboratorium/ Ruang Kendali ###
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 8.00 396,000.00 3,168,000.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 2.00 528,000.00 1,056,000.00
- Lampu Phillips 2 x 36W/220V, waterproof unit 8.00 528,000.00 4,224,000.00
- Single switch 10 A/ 220V plano unit 18.00 18,700.00 336,600.00
- Double Switch 10 A/ 220V plano unit 4.00 23,100.00 92,400.00
- Outlet 10A / 220V unit 10.00 92,073.30 920,733.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 3.00 253,605.40 760,816.19
- Kabel NYM 3 x 2,5 mm2 m 250.00 14,300.00 3,575,000.00
- uPVC Conduit 20 m m 175.00 8,635.00 1,511,125.00
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
- Exhaust fan, Industrial type, wall mounted, 16", komplit base fr set 2.00 583,000.00 1,166,000.00
- Air Conditioning, Cooling Capacity 1350W, 1 phase, wall moun set 2.00 5,445,000.00 10,890,000.00
7 Penerangan Ruang Pompa Air Bersih ###
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 8.00 396,000.00 3,168,000.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 8.00 528,000.00 4,224,000.00
- Single switch 10 A/ 220V plano unit 6.00 18,700.00 112,200.00
- Double Switch 10 A/ 220V plano unit 4.00 23,100.00 92,400.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 2.00 253,605.40 507,210.79
- Kabel NYM 3 x 2,5 mm2 m 180.00 14,300.00 2,574,000.00
- uPVC Conduit 20 m m 150.00 8,635.00 1,295,250.00
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
- Exhaust fan, Industrial type, wall mounted, 16", komplit base fr set 2.00 583,000.00 1,166,000.00
8 Panel Penerangan Work shop (PP-WS) ###
- Box Plastic mini pragma pintu tranparant, inbow, 24 modul unit 1.00 297,880.00 297,880.00
- MCB 3P/16A 10 KA unit 1.00 190,129.50 190,129.50
- RCCB/ELCB, 4P, 25A, Sensitifitas : 30 mA unit 1.00 568,551.50 568,551.50
- MCB 1P/6A 6 KA unit 4.00 40,414.00 161,656.00
- MCB 1P/10A 6 KA unit 3.00 40,414.00 121,242.00
9 Penerangan Ruang Workshop ###
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 8.00 396,000.00 3,168,000.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 8.00 528,000.00 4,224,000.00
- Lampu Phillips 18W/220V, Baret type unit 2.00 528,000.00 1,056,000.00
- Mercury 250 watt with industrial cap type high-bay reflector 55 unit 4.00 676,500.00 2,706,000.00
- Single switch 10 A/ 220V plano unit 6.00 18,700.00 112,200.00
- Double Switch 10 A/ 220V plano unit 4.00 23,100.00 92,400.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 2.00 253,605.40 507,210.79
- Kabel NYM 3 x 2,5 mm2 m 180.00 14,300.00 2,574,000.00
- uPVC Conduit 20 m m 150.00 8,635.00 1,295,250.00
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
- Exhaust fan, Industrial type, wall mounted, 16", komplit base fr set 2.00 583,000.00 1,166,000.00
10 Penangkal Petir Bangunan Workshop, Lab dan Office ###
- Penangkal Petir type Elctrode dengan Rmin = 60m LS 1.00 10,822,650.43 10,822,650.43
- BC 50 mm2 m 56.00 54,450.00 3,049,200.00
- Clamp BC, 50 mm2 unit 200.00 40,383.02 8,076,604.80
- Air terminal Ø 1, termasuk dudukan, komplit set 8.00 686,511.41 5,492,091.26
- GIP Ø 2 termasuk socket set 2.00 662,281.60 1,324,563.20
- Grounding rod 3/4 set 2.00 282,681.17 565,362.34
- Pipa PVC Ø 1, termasuk clamp set 2.00 290,757.78 581,515.55
- Box control 30x30x70 cm LS 2.00 848,043.50 1,696,087.01
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
11 Penangkal Petir Bangunan Pompa Air Bersih ###
- Penangkal Petir type Elctrode dengan Rmin = 60m LS 1.00 10,822,650.43 10,822,650.43
- BC 50 mm2 m 74.00 54,450.00 4,029,300.00
- Clamp BC, 50 mm2 unit 250.00 40,383.02 10,095,756.00
- Air terminal Ø 1, termasuk dudukan, komplit set 4.00 686,511.41 2,746,045.63
- GIP Ø 2 termasuk socket set 4.00 662,281.60 2,649,126.39
- Grounding rod 3/4 set 2.00 282,681.17 565,362.34
- Pipa PVC Ø 1, termasuk clamp set 2.00 290,757.78 581,515.55
- Box control 30x30x70 cm LS 2.00 848,043.50 1,696,087.01
12 Panel Pompa Kontrol Back Wash ###
- Box Plate metal, 2000x800x600 mm, Floor Standing Unit 1.00 12,684,980.00 12,684,980.00
- MCCB 3 POLE, 200 A Unit 1.00 9,186,254.00 9,186,254.00
- Current Transformator 200/5 A Unit 3.00 833,294.00 2,499,882.00
- Power Meter Digital Unit 1.00 1,848,000.00 1,848,000.00
- Indicator Lamp R, S, T Unit 7.00 63,140.00 441,980.00
- LAMPU TL 10 watt Unit 1.00 65,450.00 65,450.00
- MINI FUSE 2A Unit 3.00 140,756.00 422,268.00
- Push Bottom Unit 1.00 63,140.00 63,140.00
- Emergency Push Button Unit 1.00 396,242.00 396,242.00
- Buzzer, 70 dBA Unit 1.00 20,350.00 20,350.00
- Plug in relay 220V, 14 pin, 4 kontak C/O, 5 amp, built in pil Unit 6.00 46,750.00 280,500.00
- Illuminated Push Button, 220VAC Unit 8.00 475,860.00 3,806,880.00
- Selector Switch 3 Posisi Unit 4.00 342,034.00 1,368,136.00
- MCCB 3 POLE, 80 A Unit 4.00 2,203,740.00 8,814,960.00
- MCB 3 POLE, 32 A Unit 2.00 700,700.00 1,401,400.00
- MCB 3 POLE, 6 A Unit 1.00 1,315,776.00 1,315,776.00
- MCB 3 POLE, 16 A Unit 1.00 1,315,776.00 1,315,776.00
- MCB 2 POLE, 6 A Unit 2.00 982,058.00 1,964,116.00
- MCB 1P/4A 6 KA Unit 3.00 161,700.00 485,100.00
- MAGNETIC CONTACTOR LC1-D50 Unit 4.00 3,986,136.00 15,944,544.00
- MAGNETIC CONTACTOR LC1-D40 Unit 2.00 3,349,346.00 6,698,692.00
- MAGNETIC CONTACTOR LC1-D25 Unit 2.00 3,349,346.00 6,698,692.00
- Thermal Overload LR-D340 Unit 2.00 2,809,268.00 5,618,536.00
- Thermal Overload LR-D21 Unit 2.00 1,107,414.00 2,214,828.00
- Power Supply DC 220VAC / 24VDC 10A Unit 1.00 6,012,930.00 6,012,930.00
- Kabel tray 200x 100 Btg 3.00 2,840,376.00 8,521,128.00
- Grounding, Perakitan dan Pemasangan lengkap termasuk aksesor LS 1.00 807,660.48 807,660.48
13 Panel Kontrol Distribusi ###
- Box Plate metal, 3400x2100x1000 mm, Floor Standing Unit 1.00 12,684,980.00 12,684,980.00
- MCCB 3 POLE, 630 A Unit 1.00 9,186,254.00 9,186,254.00
- Current Transformator 1000/5 A Unit 3.00 833,294.00 2,499,882.00
- Power Meter Digital Unit 1.00 1,848,000.00 1,848,000.00
- Indicator Lamp R, S, T Unit 3.00 63,140.00 189,420.00
- LAMPU TL 10 watt Unit 3.00 65,450.00 196,350.00
- MINI FUSE 2A Unit 3.00 140,756.00 422,268.00
- Push Bottom Unit 6.00 63,140.00 378,840.00
- Emergency Push Button Unit 1.00 396,242.00 396,242.00
- Buzzer, 70 dBA Unit 1.00 20,350.00 20,350.00
- Plug in relay 220V, 14 pin, 4 kontak C/O, 5 amp, built in pil Unit 12.00 46,750.00 561,000.00
- Illuminated Push Button, 220VAC Unit 6.00 475,860.00 2,855,160.00
- Selector Switch 3 Posisi Unit 3.00 342,034.00 1,026,102.00
- 3 POLE, 1000 A Unit 1.00 308,000.00 308,000.00
- MCB 3 POLE, 6 A Unit 5.00 1,315,776.00 6,578,880.00
- MCB 3 POLE, 10 A Unit 1.00 1,315,776.00 1,315,776.00
- MAGNETIC CONTACTOR LC1-F500 Unit 4.00 3,986,136.00 15,944,544.00
- Power Supply DC 220VAC / 24VDC 10A Unit 1.00 6,012,930.00 6,012,930.00
- Kabel tray 200x 100 Btg 3.00 2,840,376.00 8,521,128.00
- Grounding, Perakitan dan Pemasangan lengkap termasuk aksesor LS 1.00 807,660.48 807,660.48
14 Panel Meja Kontrol Filter Utama ###
- Box Plate metal, 1250x1600x1040 mm, FS Meja Unit 1.00 15,400,000.00 15,400,000.00
- MCB 1P/4A 6 KA unit 3.00 161,700.00 485,100.00
- Plug in relay 220V, 14 pin, 4 kontak C/O, 5 amp, built in pil unit 36.00 46,750.00 1,683,000.00
- Plug in relay 220V, 14 pin, 4 kontak C/O, 5 amp, built in pil unit 15.00 46,750.00 701,250.00
- Illuminated Push Button, 220VAC unit 36.00 475,860.00 17,130,960.00
- Illuminated Push Button, 220VAC unit 36.00 475,860.00 17,130,960.00
- Selector Switch 3 Posisi unit 7.00 342,034.00 2,394,238.00
- Power Supply DC 220VAC / 24VDC 10A unit 1.00 6,012,930.00 6,012,930.00
- Emergency Switch unit 1.00 396,242.00 396,242.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Push Bottom unit 2.00 63,140.00 126,280.00
- Indicator Lamp R, S, T unit 2.00 63,140.00 126,280.00
- Air Regulator unit 1.00 2,199,120.00 2,199,120.00
- Air Pressure Switch unit 1.00 2,489,256.00 2,489,256.00
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 807,660.48 807,660.48
15 Panel Filter ( Selenoid ) ###
- Panel Lokal Filter Outdoor type double door dengan support unit 6.00 5,390,000.00 32,340,000.00
- Selenoid valve + manifold 6 selenoid (by others) ###
- Plug in relay 220V, 14 pin, 4 kontak C/O, 5 amp, built in pil unit 30.00 46,750.00 1,402,500.00
- Illuminated Push Button Green, 220VAC unit 30.00 475,860.00 14,275,800.00
- Illuminated Push Button Red, 220VAC unit 30.00 475,860.00 14,275,800.00
- Selector Switch 3 Posisi unit 30.00 342,034.00 10,261,020.00
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 807,660.48 807,660.48
16 Panel Kontrol Filter ( kontrol ) ###
- Box Plate metal, 600x500x200 mm, Wall Mounting unit 1.00 4,620,000.00 4,620,000.00
- MCB 3P/6A, 6 KA unit 1.00 1,315,776.00 1,315,776.00
- RCCB/ELCB, 4P, 10A, Sensitifitas : 30 mA unit 1.00 930,160.00 930,160.00
- MCB 1P/4A 6 KA unit 5.00 161,700.00 808,500.00
- MCB 1P/6A 6 KA unit 1.00 40,414.00 40,414.00
- Time Switch 24 Jam unit 1.00 1,319,472.00 1,319,472.00
- Magnetic Contactor 10A unit 1.00 1,391,852.00 1,391,852.00
- Indicator Lamp R, S, T unit 3.00 63,140.00 189,420.00
- Mini Fuse 2A unit 4.00 140,756.00 563,024.00
- Selector Switch 3 Posisi unit 1.00 342,034.00 342,034.00
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 807,660.48 807,660.48
17 Instalasi Penerangan R. Pompa ###
- Lampu TL 2 X 18 watt unit 12.00 65,450.00 785,400.00
- Lampu TL 2 x 36 watt unit 9.00 65,450.00 589,050.00
- Outlet 10 A/2P+E 220V unit 1.00 170,940.00 170,940.00
- Stop kontak AC unit 1.00 38,500.00 38,500.00
- Double Switch 10 A/ 220V plano unit 2.00 23,100.00 46,200.00
- Single switch 10 A/ 220V plano unit 2.00 18,700.00 37,400.00
- Instalasi titik lampu titik 21.00 589,050.00 12,370,050.00
- Instalasi stop kontak titik 2.00 392,700.00 785,400.00
- Kabel dari penerangan Pompa ke Panel Pompa Distribusi ###
- - NYY 5 x 2,5 mm2 meter 15.00 44,044.00 660,660.00
18 Panel Penerangan R. Kontrol dan R. Backwash ###
- Box plastic mini pragma pintu transparant, inbow, 12 modul unit 1.00 308,000.00 308,000.00
- RCCB/ELCB, 4P, 10A, Sensitifitas : 30 mA unit 1.00 930,160.00 930,160.00
- MCB 3P, 10 Amp unit 1.00 1,315,776.00 1,315,776.00
- MCB 1P/4A 6 KA unit 5.00 161,700.00 808,500.00
- MCB 1P/6A 6 KA unit 1.00 40,414.00 40,414.00
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 807,660.48 807,660.48
19 Instalasi Penerangan R. Kontrol dan R. Backwash ###
- Lampu TL 2 X 18 watt unit 6.00 65,450.00 392,700.00
- Outlet 10 A/2P+E 220V unit 5.00 170,940.00 854,700.00
- Stop kontak 3P 6 Amp (pug & soket) unit 1.00 662,046.00 662,046.00
- Stop kontak AC unit 2.00 38,500.00 77,000.00
- Double Switch 10 A/ 220V plano unit 2.00 23,100.00 46,200.00
- Single switch 10 A/ 220V plano unit 5.00 18,700.00 93,500.00
- Instalasi titik lampu titik 6.00 589,050.00 3,534,300.00
- Instalasi stop kontak titik 8.00 392,700.00 3,141,600.00
- Kabel dari P. Penerangan R. Kontrol ke Panel Backwash
- - NYY 5 x 2,5 mm2 meter 20.00 44,044.00 880,880.00
Jumlah 549,559,963.02

d Pemasangan Elektrikal dan Accesories


1 Panel workshop (PK-WK)
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 807,660.48 807,660.48
2 Panel Penerangan Ruang Kantor (PP-KR) ###
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 807,660.48 807,660.48
3 Terminal board Grounding (1B-G) ###
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 807,660.48 807,660.48
4 Panel Penerangan Lampu Luar Air Bersih (PP-LR3) ###
- Perakitan dan Pemasangan lengkap termasuk aksesoris set 1.00 807,660.48 807,660.48
5 Panel penerangan Ruang Pompa Air Bersih (PP-AB) ###
- Perakitan dan Pemasangan lengkap termasuk aksesoris set 1.00 807,660.48 807,660.48
6 Penerangan Ruang Kantor/ Laboratorium/ Ruang Kendali ###
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Lampu Phillips 2 x 36W/220V, waterproof unit 1.00 40,370.00 40,370.00
- Outlet 10A / 220V unit 1.00 24,200.00 24,200.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 1.00 24,200.00 24,200.00
- Exhaust fan, Industrial type, wall mounted, 16", komplit base fr set 1.00 242,220.00 242,220.00
- Air Conditioning, Cooling Capacity 1350W, 1 phase, wall moun set 1.00 242,220.00 242,220.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Titik Lampu titik 1.00 72,689.44 72,689.44
7 Penerangan Ruang Pompa Air Bersih ###
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 1.00 24,200.00 24,200.00
- Exhaust fan, Industrial type, wall mounted, 16", komplit base fr set 1.00 242,220.00 242,220.00
- Titik Lampu titik 1.00 72,689.44 72,689.44
8 Panel Penerangan Work shop (PP-WS) ###
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 807,660.48 807,660.48
9 Penerangan Ruang Workshop ###
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Lampu Phillips 18W/220V, Baret type unit 1.00 40,370.00 40,370.00
- Mercury 250 watt with industrial cap type high-bay reflector 55 unit 1.00 40,370.00 40,370.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 1.00 40,370.00 40,370.00
- Exhaust fan, Industrial type, wall mounted, 16", komplit base fr set 1.00 242,220.00 242,220.00
- Titik Lampu titik 1.00 72,689.44 72,689.44
10 Penangkal Petir Bangunan Workshop, Lab dan Office ###
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 807,660.48 807,660.48
11 Penangkal Petir Bangunan Pompa Air Bersih
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 807,660.48 807,660.48
Jumlah 8,124,532.16

- PEKERJAAN MEKANIKAL DAN ELEKTRIKAL LUAR BANGUNAN 7,381,297,309.05


a Pengadaan kabel-kabel
1 Kabel dari PLN ke Panel TM, Primer Trafo, Sekunder Trafo, Genset, MDP ke masing - masing panel (Air Baku, Air bersih, Blower, Dosing, Panel Penerangan, Gense
- Dari meter PLN ke Panel TM (cubicle)
- Kabel XLPE 1 x 70 mm2 12/20/kV m 60.00 158,400.00 9,504,000.00
- Terminating kabel XLPE, 70 mm2 set 6.00 5,088,261.02 30,529,566.14
- Dari meter Panel TM (cubicle) ke primer trafo ###
- Kabel XLPE 1 x 70 mm2 12/20/kV m 30.00 158,400.00 4,752,000.00
- Terminating kabel XLPE, 70 mm2 set 6.00 5,088,261.02 30,529,566.14
- Dari Sekunder trafo ke Panel MDP ###
- Kabel NYY 1 x 500 mm2 m 80.00 434,500.00 34,760,000.00
- Dari Generator 2x625 kVA ke Panel MDP ###
- Kabel NYY 1 x 300 mm2 m 120.00 269,500.00 32,340,000.00
- Kabel NYY 1 x 500 mm2 m 40.00 434,500.00 17,380,000.00
- Kabel NYA 1 x 120 mm2 m 30.00 104,500.00 3,135,000.00
- Dari Panel MDP ke panel M-PK (Pompa Doosing Kimia) ###
- Kabel NYFGbY 4 x 16 mm2 m 183.00 71,500.00 13,084,500.00
- Kabel NYA 1 x 16 mm2 m 183.00 14,300.00 2,616,900.00
- Dari Panel MDP ke Panel M-FL (Filter) ###
- Kabel NYFGbY 4 x 35 mm2 m 102.00 137,500.00 14,025,000.00
- Kabel NYA 1 x 25 mm2 m 102.00 23,100.00 2,356,200.00
- Kabel NYFGbY 4 x 95 mm2 m 85.00 335,500.00 28,517,500.00
- Kabel NYA 1 x 70 mm2 m 85.00 59,400.00 5,049,000.00
- Dari Panel MDP ke panel DP - WS (Workshop) ###
- Kabel NYFGbY 4 x 35 mm2 m 183.00 137,500.00 25,162,500.00
- Kabel NYA 1 x 25 mm2 m 183.00 23,100.00 4,227,300.00
- Dari Panel MDP ke panel PC-AB (Air Bersih) ###
- Kabel NYFGbY 4 x 300 mm2 m 30.00 1,028,500.00 30,855,000.00
- Kabel NYA 1 x 120 mm2 m 30.00 104,500.00 3,135,000.00
- Dari Panel MDP ke panel PC-ABK (Air Baku) ###
- Kabel NYFGbY 4 x 300 mm2 m 80.00 1,028,500.00 82,280,000.00
- Kabel NYA 1 x 120 mm2 m 80.00 104,500.00 8,360,000.00
- Kabel NYFGbY 4 x 95 mm2 m 80.00 335,500.00 26,840,000.00
- Kabel NYA 1 x 70 mm2 m 80.00 59,400.00 4,752,000.00
- Dari MDP ke Panel TB-G (terminal Box Grounding) ###
- Kabel NYA 1 x 120 mm2 m 9.00 104,500.00 940,500.00
- Dari panel TB-G ke box control ###
- Kabel NYA 1 x 120 mm2 m 24.00 104,500.00 2,508,000.00
- Acessories ###
- GIP 1 " m 4.00 63,966.71 255,866.82
- GIP 2" m 20.00 123,200.00 2,464,000.00
- GIP 3" m 8.00 181,720.00 1,453,760.00
- GIP 4" m 16.00 281,204.00 4,499,264.00
2 Kabel daya ke sub panel / panel penerangan ###
- Dari Panel MDP ke panel PP-RL ###
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Kabel NYY 4 x 4 mm2 m 7.00 33,000.00 231,000.00
- Kabel NYA 1 x 6 mm2 m 7.00 9,240.00 64,680.00
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Dari Panel M-PK ke panel PP-RJ (PP Ruang Jaga) ###
- Kabel NYFGbY 3 x 4 mm2 m 40.00 26,950.00 1,078,000.00
- GIP 1 " m 3.00 63,966.71 191,900.12
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
- Dari Panel M-PK ke panel PP-RK ###
- Kabel NYY 4 x 4 mm2 m 25.00 33,000.00 825,000.00
- Kabel NYA 1 x 6 mm2 m 25.00 9,240.00 231,000.00
- GIP 1 " m 2.00 63,966.71 127,933.41
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
- Dari Panel M-PK ke panel PP-KR ###
- Kabel NYY 4 x 6 mm2 m 20.00 46,200.00 924,000.00
- Kabel NYA 1 x 6 mm2 m 20.00 9,240.00 184,800.00
- GIP 1 " m 2.00 63,966.71 127,933.41
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
- Dari Panel PC-ABK ke panel PP-ABK ###
- Kabel NYY 4 x 4 mm2 m 7.00 33,000.00 231,000.00
- Kabel NYA 1 x 6 mm2 m 7.00 9,240.00 64,680.00
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
- Dari Panel F-FL ke panel PP - RL2 ###
- Kabel NYY 4 x 6 mm2 m 7.00 46,200.00 323,400.00
- Kabel NYA 1 x 6 mm2 m 7.00 9,240.00 64,680.00
- Dari Panel M-FL ke panel PP-FL ###
- Kabel NYY 4 x 6 mm2 m 7.00 46,200.00 323,400.00
- Kabel NYA 1 x 6 mm2 m 7.00 9,240.00 64,680.00
- GIP 1 " m 2.00 63,966.71 127,933.41
- Dari Panel M-FL ke Panel PC-BWR ###
- Kabel NYY 4 x 4 mm2 m 150.00 33,000.00 4,950,000.00
- Kabel NYA 1 x 6 mm2 m 40.00 9,240.00 369,600.00
- Dari panel M-FL ke panel MOBV filter ###
- Kabel NYY 4 x 2.5 mm2 m 150.00 22,000.00 3,300,000.00
- Dari Panel M-FL ke panel PC-BWR ###
- Kabel NYFGbY 4 x 25 mm2 m 80.00 104,500.00 8,360,000.00
- Kabel NYA 1 x 25 mm2 m 80.00 23,100.00 1,848,000.00
- GIP 2" m 8.00 123,200.00 985,600.00
- Dari Panel PC-BWR ke panel PP-BWR ###
- Kabel NYY 3x4 mm2 m 7.00 25,300.00 177,100.00
- Kabel NYA 1 x 6 mm2 m 7.00 9,240.00 64,680.00
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
- Dari Panel PC-BW ke panel PP-BW ###
- Kabel NYY 4 x 4 mm2 m 7.00 33,000.00 231,000.00
- Kabel NYA 1 x 6 mm2 m 7.00 9,240.00 64,680.00
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
- Dari Panel PC-AB ke panel PP-LR3 ###
- Kabel NYFGbY 4 x 6 mm2 m 15.00 39,600.00 594,000.00
- Kabel NYA 1 x 6 mm2 m 15.00 9,240.00 138,600.00
- Dari panel PP - LR3 ke panel PP-PJ ###
- Kabel NYY 4 x 4 mm2 m 7.00 33,000.00 231,000.00
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
- Dari Panel PC-AB ke panel PP-AB ###
- Kabel NYY 4 x 4 mm2 m 7.00 33,000.00 231,000.00
- Kabel NYA 1 x 6 mm2 m 7.00 9,240.00 64,680.00
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
- Dari Panel PC-ABK ke panel PP-LR1 ###
- Kabel NYFGbY 4 x 6 mm2 m 15.00 39,600.00 594,000.00
- Kabel NYA 1 x 6 mm2 m 15.00 9,240.00 138,600.00
3 Kabel daya dan kontrol dari masing - masing panel kontrol ke masing - masing motor, ukuran kabel sesuai dengan spesifikasi masing - masing motor ###
- Dari Panel PC -AB ke terminal motor, pompa Air Bersih ###
- Kabel NYY 3 x 70 mm2 m 120.00 187,000.00 22,440,000.00
- Kabel NYA 1 x 70 mm2 m 60.00 59,400.00 3,564,000.00
- Dari Panel PC -AB ke terminal motor, pompa backwash ###
- Kabel NYY 3 x 6 mm2 m 72.00 35,200.00 2,534,400.00
- Kabel NYA 1 x 6 mm2 m 36.00 9,240.00 332,640.00
- Dari Panel PC -ABK ke terminal motor, pompa air baku ###
- Kabel NYY 3 x 35 mm2 m 80.00 104,500.00 8,360,000.00
- Kabel NYA 1 x 35 mm2 m 20.00 30,800.00 616,000.00
- Dari Panel PC -ABK ke terminal motor blower ###
- Kabel NYY 3 x 6 mm2 m 40.00 35,200.00 1,408,000.00
- Kabel NYA 1 x 6 mm2 m 20.00 9,240.00 184,800.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Dari Panel PC -ABK ke terminal motor air compressor ###
- Kabel NYY 3 x 6 mm2 m 100.00 35,200.00 3,520,000.00
- Kabel NYA 1 x 6 mm2 m 12.00 9,240.00 110,880.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Dari Panel PC -ABK ke terminal motor mixer/pompa dosing/blower ###
- Kabel NYY 4 x 2.5 mm2 m 100.00 22,000.00 2,200,000.00
- Dari Panel PC -ABK ke local control panel (LCP-MX/BW/AL/SA) ###
- Kabel NYY 3 x 2.5 mm2 m 80.00 16,500.00 1,320,000.00
- Dari Panel PC -ABK ke masing-masing pneumatice valve ###
- Kabel NYY 3 x 2.5 mm2 m 600.00 16,500.00 9,900,000.00
- Dari Panel M-FL ke masing-masing pneumatice valve sludge drain ###
- Kabel NYY 3 x 2.5 mm2 m 100.00 16,500.00 1,650,000.00
- Dari Panel PC-ABK ke LCP-ABK 1/2/3 ###
- Kabel NYY 3 x 2.5 mm2 m 66.00 16,500.00 1,089,000.00
- Acessories ###
- Supporting kabel/rak LS 1.00 7,995,838.75 7,995,838.75
4 Kabel dari Panel Dosing ke peralatan ###
- Kabel dari Panel Dosing ke LVMDP ###
- NYFGBY 4 x 70 mm2 meter 150.00 338,800.00 50,820,000.00
- BC 35 mm2 meter 30.00 91,168.00 2,735,040.00
- Kabel dari Panel Dosing ke Dosing pumps ###
- NYY 4 x 2.5 mm2 meter 95.00 20,728.63 1,969,220.00
- NYYHY 3 x 1,5 mm2 meter 110.00 22,638.00 2,490,180.00
- Kabel dari Panel Dosing ke Mixer ###
- NYY 4 x 2,5 mm2 meter 110.00 52,360.00 5,759,600.00
- NYYHY 3 x 1,5 mm2 meter 110.00 22,638.00 2,490,180.00
- Kabel tray 30 x 40 Btg 1.00 2,784,474.00 2,784,474.00
5 Pekerjaan kabel ( Ruang Genset ) ###
- Kabel dari Cubicle PLN ke Cubicle User ###
- XLPE 3 x (1 x 70mm2) meter 20.00 455,840.00 9,116,800.00
- Kabel dari LVMDP ke Genset ###
- NYFGBY 4 x (4 x 300 mm2) meter 15.00 10,780,000.00 161,700,000.00
- Kabel dari Cubicle ke travo ###
- XLPE 3 x (1 x 70mm2) meter 10.00 455,840.00 4,558,400.00
- Kabel dari Travo ke LVMDP ###
- NYY 3 x (4 x 1 x 500 mm2) meter 15.00 3,537,155.89 53,057,338.35
- NYY 1 x (2 x 1 x 500 mm2) meter 15.00 2,667,280.00 40,009,200.00
6 Instalasi Pentanahan ###
- Grounding untuk Cubicle Netral PLN ###
- BC 35 mm2 meter 20.00 91,168.00 1,823,360.00
- Grounding rod 3/4 batang 4.00 2,266,880.00 9,067,520.00
- Grounding untuk Spare ###
- BC 35 mm2 meter 17.00 91,168.00 1,549,856.00
- Grounding rod 3/4 batang 4.00 2,266,880.00 9,067,520.00
- Grouding Netral Genset ###
- BC 35 mm2 meter 27.00 91,168.00 2,461,536.00
- Grounding rod 3/4 batang 4.00 2,266,880.00 9,067,520.00
- Grounding Netral Travo ###
- BC 35 mm2 meter 31.00 91,168.00 2,826,208.00
- Grounding rod 3/4 batang 4.00 2,266,880.00 9,067,520.00
- Grouding Panel (JB) ###
- BC 2 x 120 mm2 meter 51.00 608,608.00 31,039,008.00
- Grounding rod 3/4 batang 4.00 2,266,880.00 9,067,520.00
- Junction Box Grounding ke Genset, Travo ###
- BC 35 mm2 meter 30.00 91,168.00 2,735,040.00
- Grounding rod 3/4 batang 4.00 2,266,880.00 9,067,520.00
- Junction Box Grounding ke LVMDP ###
- BC 120 mm2 meter 20.00 304,304.00 6,086,080.00
- Grounding rod 3/4 batang 4.00 2,266,880.00 9,067,520.00
- Junction Box Grounding unit 1.00 2,580,270.00 2,580,270.00
7 Pekerjaan kabel-kabel di IPA ###
- Kabel dari Panel Distribusi ke Pompa Distribusi ###
- NYY 3 x (1 x 300mm2) meter 70.00 2,185,260.00 152,968,200.00
- BC 120 mm2 meter 70.00 304,304.00 21,301,280.00
- Kabel dari Panel Distribusi ke LVMDP ###
- NYFGBY 4 x 300 mm2 meter - 1,028,500.00 -
- BC 120 mm2 meter 20.00 304,304.00 6,086,080.00
- Kabel dari Panel Distribusi ke Hoist ###
- NYY 4 x 2,5 mm2 meter 10.00 52,360.00 523,600.00
Junction box untuk hoist unit 1.00 1,319,472.00 1,319,472.00
- Kabel dari Panel backwash ke LVMDP ###
-NYFGBY 4 x 95 mm meter 200.00 1,076,460.00 215,292,000.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
-NYFGBY 4 x 1.5 mm meter 10.00 156,156.00 1,561,560.00
- BC 35 mm2 meter - 91,168.00 -
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Kabel dari Panel Backwash ke Hoist ###
- NYY 4 x 2,5 mm2 meter 1.00 52,360.00 52,360.00
Junction box untuk hoist unit 1.00 1,319,472.00 1,319,472.00
- Kabel dari Panel Meja ke Panel Lokal Filter 1 ###
- NYYHY 6 x (4 x 1,5mm2) meter 50.00 156,156.00 7,807,800.00
- Kabel dari Panel Meja ke Panel Lokal Filter 2 ###
- NYYHY 6 x (4 x 1,5mm2) meter 45.00 156,156.00 7,027,020.00
- Kabel dari Panel Meja ke Panel Lokal Filter 3 ###
- NYYHY 6 x (4 x 1,5mm2) meter 45.00 156,156.00 7,027,020.00
- Kabel dari Panel Meja ke Panel Lokal Filter 4 ###
- NYYHY 6 x (4 x 1,5mm2) meter 40.00 156,156.00 6,246,240.00
- Kabel dari Panel Meja ke Panel Lokal Filter 5 ###
- NYYHY 6 x (4 x 1,5mm2) meter 40.00 156,156.00 6,246,240.00
- Kabel dari Panel Meja ke Panel Lokal Filter 6 ###
- NYYHY 6 x (4 x 1,5mm2) meter 35.00 156,156.00 5,465,460.00
Pipa GIP 3 x 3 inch meter 25.00 384,846.00 9,621,150.00
- Kabel dari Panel Lokal Filter 1 ke Limit switch Pneumatic Valve ###
- NYYHY 3 x 1,5 mm2 meter 50.00 22,638.00 1,131,900.00
- Kabel dari Panel Lokal Filter 2 ke Limit switch Pneumatic Valve ###
- NYYHY 3 x 1,5 mm2 meter 45.00 22,638.00 1,018,710.00
- Kabel dari Panel Lokal Filter 3 ke Limit switch Pneumatic Valve ###
- NYYHY 3 x 1,5 mm2 meter 40.00 22,638.00 905,520.00
- Kabel dari Panel Lokal Filter 4 ke Limit switch Pneumatic Valve ###
- NYYHY 3 x 1,5 mm2 meter 35.00 22,638.00 792,330.00
- Kabel dari Panel Lokal Filter 5 ke Limit switch Pneumatic Valve ###
- NYYHY 3 x 1,5 mm2 meter 33.00 22,638.00 747,054.00
- Kabel dari Panel Lokal Filter 6 ke Limit switch Pneumatic Valve ###
- NYYHY 3 x 1,5 mm2 meter 25.00 22,638.00 565,950.00
Jumlah 1,428,474,190.55

b Pemasangan kabel-kabel
Kabel dari PLN ke Panel TM, Primer Trafo, Sekunder Trafo, Genset, MDP ke masing - masing panel (Air Baku, Air bersih, Blower, Dosing, Panel Penerangan,
1
Genset )
- Dari meter PLN ke Panel TM (cubicle)
- Kabel XLPE 1 x 70 mm2 12/20/kV m 60.00 31,680.00 1,900,800.00
- Terminating kabel XLPE, 70 mm2 set 6.00 1,211,490.72 7,268,944.32
- Dari meter Panel TM (cubicle) ke primer trafo
- Kabel XLPE 1 x 70 mm2 12/20/kV m 30.00 31,680.00 950,400.00
- Terminating kabel XLPE, 70 mm2 set 6.00 1,211,490.72 7,268,944.32
- Dari Sekunder trafo ke Panel MDP
- Kabel NYY 1 x 500 mm2 m 80.00 31,680.00 2,534,400.00
- Dari Generator 2x625 kVA ke Panel MDP
- Kabel NYY 1 x 300 mm2 m 120.00 31,680.00 3,801,600.00
- Kabel NYY 1 x 500 mm2 m 40.00 31,680.00 1,267,200.00
- Kabel NYA 1 x 120 mm2 m 30.00 31,680.00 950,400.00
- Dari Panel MDP ke panel M-PK (Pompa Doosing Kimia)
- Kabel NYFGbY 4 x 16 mm2 m 183.00 31,680.00 5,797,440.00
- Kabel NYA 1 x 16 mm2 m 183.00 31,680.00 5,797,440.00
- Dari Panel MDP ke Panel M-FL (Filter)
- Kabel NYFGbY 4 x 35 mm2 m 102.00 31,680.00 3,231,360.00
- Kabel NYA 1 x 25 mm2 m 102.00 31,680.00 3,231,360.00
- Kabel NYFGbY 4 x 95 mm2 m 85.00 31,680.00 2,692,800.00
- Kabel NYA 1 x 70 mm2 m 85.00 31,680.00 2,692,800.00
- Dari Panel MDP ke panel DP - WS (Workshop)
- Kabel NYFGbY 4 x 35 mm2 m 183.00 31,680.00 5,797,440.00
- Kabel NYA 1 x 25 mm2 m 183.00 31,680.00 5,797,440.00
- Dari Panel MDP ke panel PC-AB (Air Bersih)
- Kabel NYFGbY 4 x 300 mm2 m 30.00 31,680.00 950,400.00
- Kabel NYA 1 x 120 mm2 m 30.00 31,680.00 950,400.00
- Dari Panel MDP ke panel PC-ABK (Air Baku)
- Kabel NYFGbY 4 x 300 mm2 m 80.00 31,680.00 2,534,400.00
- Kabel NYA 1 x 120 mm2 m 80.00 31,680.00 2,534,400.00
- Kabel NYFGbY 4 x 95 mm2 m 80.00 31,680.00 2,534,400.00
- Kabel NYA 1 x 70 mm2 m 80.00 31,680.00 2,534,400.00
- Dari MDP ke Panel TB-G (terminal Box Grounding)
- Kabel NYA 1 x 120 mm2 m 9.00 31,680.00 285,120.00
- Dari panel TB-G ke box control
- Kabel NYA 1 x 120 mm2 m 24.00 31,680.00 760,320.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
2 Kabel daya ke sub panel / panel penerangan
- Dari Panel MDP ke panel PP-RL
- Kabel NYY 4 x 4 mm2 m 7.00 31,680.00 221,760.00
- Kabel NYA 1 x 6 mm2 m 7.00 31,680.00 221,760.00
- Dari Panel M-PK ke panel PP-RJ (PP Ruang Jaga)
- Kabel NYFGbY 3 x 4 mm2 m 40.00 31,680.00 1,267,200.00
- Dari Panel M-PK ke panel PP-RK
- Kabel NYY 4 x 4 mm2 m 25.00 31,680.00 792,000.00
- Kabel NYA 1 x 6 mm2 m 25.00 31,680.00 792,000.00
- Dari Panel M-PK ke panel PP-KR
- Kabel NYY 4 x 6 mm2 m 20.00 31,680.00 633,600.00
- Kabel NYA 1 x 6 mm2 m 20.00 31,680.00 633,600.00
- Dari Panel PC-ABK ke panel PP-ABK
- Kabel NYY 4 x 4 mm2 m 7.00 31,680.00 221,760.00
- Kabel NYA 1 x 6 mm2 m 7.00 31,680.00 221,760.00
- Dari Panel F-FL ke panel PP - RL2
- Kabel NYY 4 x 6 mm2 m 7.00 31,680.00 221,760.00
- Kabel NYA 1 x 6 mm2 m 7.00 31,680.00 221,760.00
- Dari Panel M-FL ke panel PP-FL
- Kabel NYY 4 x 6 mm2 m 7.00 31,680.00 221,760.00
- Kabel NYA 1 x 6 mm2 m 7.00 31,680.00 221,760.00
- Dari Panel M-FL ke Panel PC-BWR
- Kabel NYY 4 x 4 mm2 m 150.00 31,680.00 4,752,000.00
- Kabel NYA 1 x 6 mm2 m 40.00 31,680.00 1,267,200.00
- Dari panel M-FL ke panel MOBV filter
- Kabel NYY 4 x 2.5 mm2 m 150.00 31,680.00 4,752,000.00
- Dari Panel M-FL ke panel PC-BWR
- Kabel NYFGbY 4 x 25 mm2 m 80.00 31,680.00 2,534,400.00
- Kabel NYA 1 x 25 mm2 m 80.00 31,680.00 2,534,400.00
- Dari Panel PC-BWR ke panel PP-BWR
- Kabel NYY 3x4 mm2 m 7.00 31,680.00 221,760.00
- Kabel NYA 1 x 6 mm2 m 7.00 31,680.00 221,760.00
- Dari Panel PC-BW ke panel PP-BW
- Kabel NYY 4 x 4 mm2 m 7.00 31,680.00 221,760.00
- Kabel NYA 1 x 6 mm2 m 7.00 31,680.00 221,760.00
- Dari Panel PC-AB ke panel PP-LR3
- Kabel NYFGbY 4 x 6 mm2 m 15.00 31,680.00 475,200.00
- Kabel NYA 1 x 6 mm2 m 15.00 31,680.00 475,200.00
- Dari panel PP - LR3 ke panel PP-PJ
- Kabel NYY 4 x 4 mm2 m 7.00 31,680.00 221,760.00
- Dari Panel PC-AB ke panel PP-AB
- Kabel NYY 4 x 4 mm2 m 7.00 31,680.00 221,760.00
- Kabel NYA 1 x 6 mm2 m 7.00 31,680.00 221,760.00
- Dari Panel PC-ABK ke panel PP-LR1
- Kabel NYFGbY 4 x 6 mm2 m 15.00 31,680.00 475,200.00
- Kabel NYA 1 x 6 mm2 m 15.00 31,680.00 475,200.00
2 Kabel daya dan kontrol dari masing - masing panel kontrol ke masing - masing motor, ukuran kabel sesuai dengan spesifikasi masing - masing motor
- Dari Panel PC -AB ke terminal motor, pompa Air Bersih
- Kabel NYY 3 x 70 mm2 m 120.00 31,680.00 3,801,600.00
- Kabel NYA 1 x 70 mm2 m 60.00 31,680.00 1,900,800.00
- Dari Panel PC -AB ke terminal motor, pompa backwash
- Kabel NYY 3 x 6 mm2 m 72.00 31,680.00 2,280,960.00
- Kabel NYA 1 x 6 mm2 m 36.00 31,680.00 1,140,480.00
- Dari Panel PC -ABK ke terminal motor, pompa air baku
- Kabel NYY 3 x 35 mm2 m 80.00 31,680.00 2,534,400.00
- Kabel NYA 1 x 35 mm2 m 20.00 31,680.00 633,600.00
- Dari Panel PC -ABK ke terminal motor blower
- Kabel NYY 3 x 6 mm2 m 40.00 31,680.00 1,267,200.00
- Kabel NYA 1 x 6 mm2 m 20.00 31,680.00 633,600.00
- Dari Panel PC -ABK ke terminal motor air compressor
- Kabel NYY 3 x 6 mm2 m 100.00 31,680.00 3,168,000.00
- Kabel NYA 1 x 6 mm2 m 12.00 31,680.00 380,160.00
- Dari Panel PC -ABK ke terminal motor mixer/pompa dosing/blower
- Kabel NYY 4 x 2.5 mm2 m 100.00 31,680.00 3,168,000.00
- Dari Panel PC -ABK ke local control panel (LCP-MX/BW/AL/SA)
- Kabel NYY 3 x 2.5 mm2 m 80.00 31,680.00 2,534,400.00
- Dari Panel PC -ABK ke masing-masing pneumatice valve
- Kabel NYY 3 x 2.5 mm2 m 600.00 31,680.00 19,008,000.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Dari Panel M-FL ke masing-masing pneumatice valve sludge drain
- Kabel NYY 3 x 2.5 mm2 m 100.00 31,680.00 3,168,000.00
- Dari Panel PC-ABK ke LCP-ABK 1/2/3
- Kabel NYY 3 x 2.5 mm2 m 66.00 31,680.00 2,090,880.00
Jumlah 146,960,288.64

c Pengadaan Lampu Penerangan Luar


1 Dari panel PP-LR1
- Lampu LED 56W with aluminium housing, termasuk MCB dan tr set 17.00 2,464,000.00 41,888,000.00
- Tiang lampu hot dip galvanis 6 m set 17.00 2,200,000.00 37,400,000.00
- Kabel NYFGbY 3 x 4 mm2 m 15.00 26,950.00 404,250.00
- Kabel NYFGbY 3 x 2,5 mm2 m 185.00 18,700.00 3,459,500.00
- Kabel NYFGbY 2 x 2,5 mm2 m 100.00 15,950.00 1,595,000.00
- GIP 2" m 6.00 123,200.00 739,200.00
2 Dari panel PP-LR2 ###
- Lampu LED 56W with aluminium housing, termasuk MCB dan tr set 17.00 2,464,000.00 41,888,000.00
- Tiang lampu hot dip galvanis 6 m set 17.00 2,200,000.00 37,400,000.00
- Kabel NYFGbY 4 x 4 mm2 m 30.00 31,900.00 957,000.00
- Kabel NYFGbY 3 x 4 mm2 m 50.00 26,950.00 1,347,500.00
- Kabel NYFGbY 3 x 2,5 mm2 m 50.00 18,700.00 935,000.00
- Kabel NYFGbY 4 x 2,5 mm2 m 60.00 22,000.00 1,320,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 40.00 15,950.00 638,000.00
3 Dari panel PP-LR3 ###
- Lampu LED 56W with aluminium housing, termasuk MCB dan tr set 17.00 2,464,000.00 41,888,000.00
- Kabel NYFGbY 3 x 2,5 mm2 m 150.00 18,700.00 2,805,000.00
- Kabel NYFGbY 4 x 4 mm2 m 50.00 31,900.00 1,595,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 220.00 15,950.00 3,509,000.00
- 5. GIP 2" m 6.00 123,200.00 739,200.00
Jumlah 220,507,650.00

d Pemasangan Lampu Penerangan Luar


1 Dari panel PP-LR1
- Lampu LED 56W with aluminium housing, termasuk MCB dan traf set 17.00 807,660.48 13,730,228.16
- Kabel NYFGbY 3 x 4 mm2 m 15.00 30,800.00 462,000.00
- Kabel NYFGbY 3 x 2,5 mm2 m 185.00 30,800.00 5,698,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 100.00 30,800.00 3,080,000.00
2 Dari panel PP-LR2
- Lampu LED 56W with aluminium housing, termasuk MCB dan traf set 17.00 807,660.48 13,730,228.16
- Kabel NYFGbY 4 x 4 mm2 m 30.00 30,800.00 924,000.00
- Kabel NYFGbY 3 x 4 mm2 m 50.00 30,800.00 1,540,000.00
- Kabel NYFGbY 3 x 2,5 mm2 m 50.00 30,800.00 1,540,000.00
- Kabel NYFGbY 4 x 2,5 mm2 m 60.00 30,800.00 1,848,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 40.00 30,800.00 1,232,000.00
3 Dari panel PP-LR3
- Lampu LED 56W with aluminium housing, termasuk MCB dan tr set 17.00 807,660.48 13,730,228.16
- Kabel NYFGbY 3 x 2,5 mm2 m 150.00 30,800.00 4,620,000.00
- Kabel NYFGbY 4 x 4 mm2 m 50.00 30,800.00 1,540,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 220.00 30,800.00 6,776,000.00
Jumlah 70,450,684.48

e Pekerjaan Grounding Sistem, Listrik PLN, Uji Komisioning Sistem Elektrikal


1 Pengadaan dan pemasangan grounding system
Grounding system di seluruh IPA, komplit dengan box kontrol
- sesuai gambar termasuk grounding peralatan, electronic dan LS 1.00 7,268,944.32 7,268,944.32
instrumentasi
2 Penyambungan Listrik PLN
- Uang Jaminan Pelanggan VA 1,385,000.00 272.25 377,066,250.00
- Biaya penyambungan VA 1,385,000.00 555.50 769,367,500.00
- Biaya installatir termasuk Sertifikasi Laik Operasi VA 1,385,000.00 145.20 201,102,000.00
- Biaya konstruksi dan peralatan penunjang LS 1.00 226,671,423.94 226,671,423.94
- Uji Komisioning Sistem Elektrikal LS 1.00 266,200,000.00 266,200,000.00
Jumlah 1,847,676,118.26

4 Pengadaan dan Pemasangan Instrumentasi dan Sistem Otomasi


1 IPA dan Pembubuh Kimia

Water level Sensor, Type Ultrasonik, Akurasi 0.2 % dari


- Range ukuran, Output 4 - 20 mA, support output to scada unit 6.00 21,787,590.00 130,725,540.00
system, instalasi to marshasling panel (backwash)
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
Chlorine Analyzer Free Reagent, output 4 - 20mA, support
- output to scada system, instalasi to marshasling panel unit 1.00 45,116,060.00 45,116,060.00
(backwash)
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6

Residual Chlorine Analyzer, support output to scada system,


- instalasi to marshasling panel ( backwahs ) bisa di aplikasikan unit 1.00 283,283,990.00 283,283,990.00
di semua area pengolahan air

8 Core Singlemode Outdoor Direct Buried, Double Jacket


- m 250.00 17,325.00
9/125um 4,331,250.00
- Fibre optic splitter set 12.00 687,500.00 8,250,000.00

- Patchcord Duplex Singlemode 9um/125um, 3 meter (LSZH) set 12.00 165,000.00 1,980,000.00

- Network cable UTP Cat5 m 80.00 10,802.36 864,189.04


- Pigtail ST Singlemode, 1 meter set 10.00 18,150.00 181,500.00

- 8-port 10/100/1000 Managed Gigabit Switch with WebView set 4.00 3,888,500.00 15,554,000.00

- Cable tray 200x50x2400x1.2mm dan penutup set 80.00 290,950.00 23,276,000.00


2 Reservoir IPA

Elektromagnetik Flowmeter dengan Akurasi 0.35 % dari


pembacaan, Output 4 - 20 mA, Bahasa komunikasi Hartcomm,
- unit 3.00 41,150,560.00 123,451,680.00
Bahan Lining PFA, DN 300 with display, flange type, support
output to scada system, instalasi to marshasling panel

Turbidity Analyzer Output 4 - 20 mA, Bahasa komunikasi


- Hartcomm, 0-10000 ntu, support output to scada system, unit 1.00 92,883,340.00 92,883,340.00
instalasi to marshasling panel

Digital pH Meter, Output 4 - 20 mA, Bahasa komunikasi


- Hartcomm, support output to scada system, instalasi to unit 1.00 17,108,300.00 17,108,300.00
marshasling panel

Pressure Transmitter dengan Akurasi 0.065 % dari span,


- Output 4 - 20 mA, Bahasa komunikasi Hartcomm, support unit 1.00 9,109,320.00 9,109,320.00
output to scada system, instalasi to marshasling panel

Water level Sensor, Tipe Ultrasonic, Akurasi 0.2 % dari Range


- ukur, Output 4 - 20 mA, support output to scada system, unit 2.00 20,903,850.00 41,807,700.00
instalasi to marshasling panel

Chlorine Analyzer Free Reagent, output 4 - 20mA, support


- output to scada system, instalasi to marshasling panel unit 1.00 45,116,060.00 45,116,060.00
(backwash)

Residual Chlorine Analyzer, support output to scada system,


- instalasi to marshasling panel ( backwahs ) bisa di aplikasikan unit 1.00 45,116,060.00 45,116,060.00
di semua area pengolahan air

8 Core Singlemode Outdoor Direct Buried, Double Jacket


- m 250.00 17,325.00 4,331,250.00
9/125um

- Fibre optic splitter set 12.00 687,500.00 8,250,000.00

- Patchcord Duplex Singlemode 9um/125um, 3 meter (LSZH) set 12.00 165,000.00 1,980,000.00
- Network cable UTP Cat5 m 80.00 10,802.36 864,189.04
- Pigtail ST Singlemode, 1 meter set 10.00 18,150.00 181,500.00

- 8-port 10/100/1000 Managed Gigabit Switch with WebView set 4.00 3,888,500.00 15,554,000.00

- Cable tray 200x50x2400x1.2mm dan penutup set 80.00 290,950.00 23,276,000.00


3 Reservoir Distribusi
- Elektromagnetik Flowmeter dengan Akurasi 0.35 % dari pembacaa unit 3.00 41,150,560.00 123,451,680.00
- Turbidity Analyzer Output 4 - 20 mA, Bahasa komunikasi Hartcom unit 1.00 92,883,340.00 92,883,340.00
- Digital pH Meter, Output 4 - 20 mA, Bahasa komunikasi Hartcomm unit 1.00 17,108,300.00 17,108,300.00
- Pressure Transmitter dengan Akurasi 0.065 % dari span, Output unit 1.00 9,109,320.00 9,109,320.00
- Water level Sensor, Tipe Ultrasonic, Akurasi 0.2 % dari Range uk unit 2.00 20,903,850.00 41,807,700.00
- Chlorine Analyzer Free Reagent, output 4 - 20mA, support output unit 1.00 45,116,060.00 45,116,060.00
- Residual Chlorine Analyzer, support output to scada system, inst unit 1.00 45,116,060.00 45,116,060.00
- GSM GPRS Communication Module and Interface, Quad Band, H unit 2.00 6,270,000.00 12,540,000.00
- 8 Core Singlemode Outdoor Direct Buried, Double Jacket 9/12 m 250.00 17,325.00 4,331,250.00
- Fibre optic splitter set 12.00 687,500.00 8,250,000.00
- Patchcord Duplex Singlemode 9um/125um, 3 meter (LSZH) set 12.00 165,000.00 1,980,000.00
- Network cable UTP Cat5 m 80.00 10,802.36 864,189.04
- Pigtail ST Singlemode, 1 meter set 10.00 18,150.00 181,500.00
- 8-port 10/100/1000 Managed Gigabit Switch with WebView set 4.00 3,888,500.00 15,554,000.00
- Cable tray 200x50x2400x1.2mm dan penutup set 80.00 290,950.00 23,276,000.00
- Elektromagnetik Flowmeter dengan Akurasi 0.35 % dari pembacaa unit 1.00 510,400,000.00 510,400,000.00
4 Sistem Otomasi ###
Hardware support Redundancy system, meliputi Base Modul,
AI/AO, DI/DO sesuai system konfigurasi dan I/O, Server,
- set 1.00 553,810,400.00 553,810,400.00
Workstation, Comm Modem, Printer, Panel and Marshalling
cabinet dan accessories
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 system, meliputi Base Modul,
Hardware support Redundancy 3 4 5 6
AI/AO, DI/DO sesuai system konfigurasi dan I/O, Server,
- set 1.00 553,810,400.00 553,810,400.00
Workstation, Comm Modem, Printer, Panel and Marshalling
cabinet dan accessories
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6

Stardom Software media, HMI software and other support


- set 1.00 363,466,400.00 363,466,400.00
software, Auto Backup
Engineering dan Generation for FCX function, MMI Display
- and MMI Operator Utility Function (Estimate graphi Panel 10 set 1.00 228,866,000.00 228,866,000.00
pages)
- Pemasangan dan supporting material set 1.00 171,058,250.00 171,058,250.00
FAT, SAT, Uji komisioning Sistem Otomasi, gambar, buku
- set 1.00 455,466,000.00 455,466,000.00
manual OP, pelatihan operator
Jumlah 3,667,228,377.12
###
XIII PEKERJAAN PERALATAN KANTOR, LAB DAN WORKSHOP 205,693,950.00
1 Pengadaan AC dan APAR ###
- Air Condition Unit 2 PK Ruang Kendali Operasional unit 4.00 9,746,000.00 38,984,000.00
- Air Condition Unit 1 PK R. Kepala Kantor unit 1.00 4,708,000.00 4,708,000.00
- Air Condition Unit 1.5 PK unit 1.00 5,445,000.00 5,445,000.00
- Fire Extinguisher 6 kg (APAR) tipe ABC Chemical Dry atau Mu unit 3.00 4,525,400.00 13,576,200.00
- Fire Extinguisher 3 kg (APAR) tipe ABC Chemical Dry atau Mu unit 1.00 2,928,200.00 2,928,200.00
- Air Condition Unit 1 PK ex. Daikin u/ R.Staf unit 1.00 4,708,000.00 4,708,000.00
- Air Condition Unit 2 PK ex. Daikin u/ R.Lobby unit 1.00 9,746,000.00 9,746,000.00
- Air Condition Unit 3/4 PK ex. Daikin Class unit 2.00 4,455,000.00 8,910,000.00
Jumlah 89,005,400.00
###
2 Pemasangan AC dan APAR ###
- Air Condition Unit 2 PK Ruang Kendali Operasional unit 1.00 242,220.00 242,220.00
- Air Condition Unit 1 PK R. Kepala Kantor unit 1.00 242,220.00 242,220.00
- Air Condition Unit 1.5 PK unit 1.00 242,220.00 242,220.00
- Fire Extinguisher 6 kg (APAR) tipe ABC Chemical Dry atau Mu unit 3.00 242,220.00 726,660.00
- Fire Extinguisher 3 kg (APAR) tipe ABC Chemical Dry atau Mu unit 1.00 242,220.00 242,220.00
- Air Condition Unit 1 PK ex. Daikin u/ R.Staf unit 1.00 242,220.00 242,220.00
- Air Condition Unit 2 PK ex. Daikin u/ R.Lobby unit 1.00 242,220.00 242,220.00
- Air Condition Unit 3/4 PK ex. Daikin Class unit 1.00 242,220.00 242,220.00
Jumlah 2,422,200.00

3 Pengadaan dan Pemasangan Peralatan Laboratorium IPA


- PH Meter Printer unit 2.00 532,400.00 1,064,800.00
- Jar Test 6 Spindel dengan lampu tabung unit 2.00 2,662,000.00 5,324,000.00
- Spektrofotometer UV-VIS unit 1.00 1,996,500.00 1,996,500.00
- Timbangan Analitik (0,001) unit 1.00 2,262,700.00 2,262,700.00
- Konduktometer unit 1.00 1,064,800.00 1,064,800.00
- Pipet Tetes unit 5.00 266,200.00 1,331,000.00
- Beaker Glass unit 5.00 532,400.00 2,662,000.00
- Beaker Glass unit 10.00 798,600.00 7,986,000.00
- Gelas Ukur unit 3.00 266,200.00 798,600.00
- Tabung Reaksi unit 12.00 2,662,000.00 31,944,000.00
- Rak Tabung Reaksi unit 2.00 1,331,000.00 2,662,000.00
- Erlenmeyer unit 4.00 1,597,200.00 6,388,800.00
- Erlenmeyer unit 4.00 3,194,400.00 12,777,600.00
- Erlenmeyer unit 5.00 5,590,200.00 27,951,000.00
- Spatula unit 2.00 2,662,000.00 5,324,000.00
- Jas Laboratorium set 4.00 266,200.00 1,064,800.00
- Corong Imhof + rak isi 4 buah set 1.00 199,650.00 199,650.00
- Pipet Volume + karet penghisap set 4.00 299,475.00 1,197,900.00
- Stop watch unit 2.00 133,100.00 266,200.00
Jumlah 114,266,350.00
ANALISA PER SATUAN PEKERJAAN
PEKERJAAN : REVIEW DED SPAM TITAB KABUPATEN BULELENG

HARGA SATUAN JUMLAH


NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6

PEKERJAAN BANGUNAN GENSET


I PEKERJAAN BANGUNAN GENSET M2 100.625 173,582,076.54
HARGA PER M2 M2 1 1,725,039.27
1 Pekerjaan Tanah
1 Pengukuran dan Pasang Bowplank m' 50.65 - -
2 Galian Tanah dengan excavator m3 354.93 - -
3 Urugan Tanah Kembali dengan Pemadatan m3 224.44 - -
4 Urugan Pasir di bawah lantai m3 13.93 - -
5 Urugan Pasir di bawah Pondasi t = 10 cm m3 38.00 - -
Jumlah 1 -

2 Pekerjaan Pasangan dan Beton


1 Pekerjaan Pasangan Batu Kosong m3 8.40 - -
2 Pekerjaan Pasangan Pondasi Batu Kali m3 42.10 832,098.61 35,031,351.64
3 Pekerjaan Beton Rabat Camp. (1 PC : 3 PS : 5KR)
- Cor Beton Camp 1:3:5 m3 7.01 - -
4 Pekerjaan Beton pondasi Plat kaki
- Beton Cor K-300 m3 5.83 - -
- besi Beton Kg 2,974.19 - -
- Begesting Pasangan Batako 1:5 m2 15.36 - -
5 Pekerjaan Beton Sloope
- Beton Cor K-300 m3 5.04 - -
- besi Beton Kg 1,126.08 - -
- Begesting 2 X pakai m2 33.60 - -
6 Pekerjaan Beton Kolom
- Beton Cor K-300 m3 8.33 - -
- besi Beton Kg 2,121.56 - -
- Begesting 2 X pakai m2 105.18 - -
7 Pekerjaan Beton Lantai Dan Pondasi Genset
- Beton Cor K-300 m3 16.49 - -
- besi Beton Kg 270.78 - -
8 Pekerjaan Beton Balok Atap
- Beton Cor K-300 m3 11.42 - -
- besi Beton Kg 1,964.15 - -
- Begesting 2 X pakai m2 80.86 - -
9 Pekerjaan Beton Plat Atap
- Beton Cor K-300 m3 15.01 - -
- besi Beton Kg 2,016.08 - -
- Begesting 2 X pakai m2 124.82 - -
10 Pekerjaan Beton Listplank
- Beton Cor K-300 m3 3.10 - -
- besi Beton Kg 698.79 - -
- Begesting 2 X pakai m2 50.09 - -
11 Kolom Praktis dan Balok Latei
- Beton Cor K-300 m3 1.07 - -
- besi Beton Kg 224.43 - -
- Begesting 2 X pakai m2 21.38 - -
12 Pekerjaan Pasangan Dinding Bata 1 Pc : 4 Ps m3 197.50 - -
13 Pekerjaan Plesteran Dinding 1 Pc : 4 Ps m3 298.12 - -
14 Pekerjaan Acian Dinding m3 474.25 - -
15 Pekerjaan Water Proofing ( Atap ) m2 161.84 57,567.20 9,316,675.65
16 Pekerjaan Beton Sloope, Ring Balk & Kolom Praktis m3 0.90 - -
17 Pekerjaan Pas. Keramik Lantai 30 x 30 m2 21.43 - -
Jumlah 2 44,348,027.29

3 Pekerjaan Kusen Pintu dan Jendela


1 Pekerjaan Kusen Pintu dan Jendela Aluminium m 21.60 - -
2 Pekerjaan Daun Jendela Jalusi m2 10.37 250,000.00 2,592,500.00
3 Pekerjaan Kusen Pintu Besi Profil C NP 140 x 60 x 7 mm m 29.63 - -
4 Pekerjaan Pintu Plat baja 2 sisi dalamnya Glass wool m2 13.68 - -
5 Pasang Engsel Pintu baja As 1" pasang 18.00 222,463.73 4,004,347.05
6 Pasang Kunci Pintu Baja pasang 4.00 222,463.73 889,854.90
7 Pasang Grendel Tanam untuk Pintu baja Set 4.00 134,518.73 538,074.90
8 Talang Air Hujan m' 20.80 326,898.00 6,799,478.40
9 Baut Angkur M22 Penjangkaran 1000 mm bh 10.00 129,419.40 1,294,194.00
Jumlah 3 16,118,449.25

4 Pekerjaan Finishing
1 Pekerjaan Pengecatan Dinding (Plamuur dan Cat Tembok) m2 437.28 - -
2 Pekerjaan Pasangan Style Bali m2 25.90 975,000.00 25,248,600.00
3 Pekerjaan Pasangan Pepalihan Style Bali m2 90.12 975,000.00 87,867,000.00
Jumlah 4 113,115,600.00

PEKERJAAN BANGUNAN RUMAH POM


I PEKERJAAN BANGUNAN RUMAH POMPA M2 100.625 118,966,476.54
HARGA PER M2 M2 1 1,182,275.54
1 Pekerjaan Tanah
1 Pengukuran dan Pasang Bowplank m' 50.65 - -
2 Galian Tanah dengan excavator m3 354.93 - -
3 Urugan Tanah Kembali dengan Pemadatan m3 224.44 - -
4 Urugan Pasir di bawah lantai m3 13.93 - -
5 Urugan Pasir di bawah Pondasi t = 10 cm m3 38.00 - -
Jumlah 1 -

2 Pekerjaan Pasangan dan Beton


1 Pekerjaan Pasangan Batu Kosong m3 8.40 - -
2 Pekerjaan Pasangan Pondasi Batu Kali m3 42.10 832,098.61 35,031,351.64
3 Pekerjaan Beton Rabat Camp. (1 PC : 3 PS : 5KR)
- Cor Beton Camp 1:3:5 m3 7.01 - -
4 Pekerjaan Beton pondasi Plat kaki
- Beton Cor K-300 m3 5.83 - -
- besi Beton Kg 2,974.19 - -
- Begesting Pasangan Batako 1:5 m2 15.36 - -
5 Pekerjaan Beton Sloope
- Beton Cor K-300 m3 5.04 - -
- besi Beton Kg 1,126.08 - -
- Begesting 2 X pakai m2 33.60 - -
6 Pekerjaan Beton Kolom
- Beton Cor K-300 m3 8.33 - -
- besi Beton Kg 2,121.56 - -
- Begesting 2 X pakai m2 105.18 - -
7 Pekerjaan Beton Lantai Dan Pondasi Genset
- Beton Cor K-300 m3 16.49 - -
- besi Beton Kg 270.78 - -
8 Pekerjaan Beton Balok Atap
- Beton Cor K-300 m3 11.42 - -
- besi Beton Kg 1,804.36 - -
- Begesting 2 X pakai m2 80.86 - -
9 Pekerjaan Beton Plat Atap
- Beton Cor K-300 m3 15.01 - -
- besi Beton Kg 2,016.08 - -
- Begesting 2 X pakai m2 124.82 - -
10 Pekerjaan Beton Listplank
- Beton Cor K-300 m3 3.10 - -
- besi Beton Kg 698.79 - -
- Begesting 2 X pakai m2 50.09 - -
11 Kolom Praktis dan Balok Latei
- Beton Cor K-300 m3 1.07 - -
- besi Beton Kg 224.43 - -
- Begesting 2 X pakai m2 21.38 - -
12 Pekerjaan Pasangan Dinding Bata 1 Pc : 4 Ps m3 197.50 - -
13 Pekerjaan Plesteran Dinding 1 Pc : 4 Ps m3 298.12 - -
14 Pekerjaan Acian Dinding m3 474.25 - -
15 Pekerjaan Water Proofing ( Atap ) m2 161.84 57,567.20 9,316,675.65
16 Pekerjaan Beton Sloope, Ring Balk & Kolom Praktis m3 0.90 - -
17 Pekerjaan Pas. Keramik Lantai 30 x 30 m2 21.43 - -
Jumlah 2 44,348,027.29

3 Pekerjaan Kusen Pintu dan Jendela


1 Pekerjaan Kusen Pintu dan Jendela Aluminium m 21.60 - -
2 Pekerjaan Daun Jendela Jalusi m2 10.37 250,000.00 2,592,500.00
3 Pekerjaan Kusen Pintu Besi Profil C NP 140 x 60 x 7 mm m 29.63 - -
4 Pekerjaan Pintu Plat baja 2 sisi dalamnya Glass wool m2 13.68 - -
5 Pasang Engsel Pintu baja As 1" pasang 18.00 222,463.73 4,004,347.05
6 Pasang Kunci Pintu Baja pasang 4.00 222,463.73 889,854.90
7 Pasang Grendel Tanam untuk Pintu baja Set 4.00 134,518.73 538,074.90
8 Talang Air Hujan m' 20.80 326,898.00 6,799,478.40
9 Baut Angkur M22 Penjangkaran 1000 mm bh 10.00 129,419.40 1,294,194.00
Jumlah 3 16,118,449.25

4 Pekerjaan Finishing
1 Pekerjaan Pengecatan Dinding (Plamuur dan Cat Tembok) m2 437.28 - -
2 Pekerjaan Pasangan Style Bali m2 15.00 975,000.00 14,625,000.00
3 Pekerjaan Pasangan Pepalihan Style Bali m2 45.00 975,000.00 43,875,000.00
Jumlah 4 58,500,000.00

PEKERJAAN BANGUNAN PRASEDIMENTASI

300 ltr/dt #REF!


I PEKERJAAN BANGUNAN PRASEDIMENTASI
#REF!
HARGA PER LTR/DTK

1 Pekerjaan Tanah
1 Pengukuran dan Pasang Bowplank m' 103.90 - -
2 Galian Tanah dengan Excavator m3 685.05 - -
3 Galian Tanah Pondasi Plat Kaki dan Pondasi Menerus 766.79 - -
4 Urugan Tanah Kembali dengan Pemadatan m3 701.88 - -
5 Urugan Pasir m3 37.58 - -
Jumlah 1 -

2 Pekerjaan Beton
1 Pekerjaan Pondasi Bor Pile Ø 40 Cm
- Galian Tanah dengan Bor Ø 40 Cm m' 858.00 #REF! #REF!
- Cor Beton K-300 m3 107.76 - -
- besi Beton kg 9,867.73 - -
2 Lantai Kerja K 125 ( 1 pc : 3 ps : 5 Kr) m3 8.51 - -
3 Pondasi Beton Plat Kaki
- Beton K 300 m3 41.26 - -
- Pembesian kg 11,694.91 - -
- Begesting Batako m2 144.41 - -
4 Pekerjaan Beton Standing Coloum
- Beton K 300 m3 27.41 - -
- Pembesian kg 7,662.59 - -
- Begesting 2x Pakai m2 252.99 - -
5 Balok Dasar Sloof
- Beton K 300 m3 18.84 - -
- Pembesian kg 10,819.18 - -
- Begesting 2x Pakai m2 209.2 - -
6 Beton Kolom
- Beton K 300 m3 16.64 - -
- Pembesian kg 5,701.44 - -
- Begesting 2x Pakai m2 173.06 - -
7 Beton Balok
- Beton K 300 m3 39.37 - -
- Pembesian kg 11,442.96 - -
- Begesting 2x Pakai m2 376.40 - -
8 Beton Plat Lantai
- Beton K 300 m3 57.75 - -
- Pembesian kg 11,145.12 - -
- Begesting 2x Pakai m2 284.96 - -
### 9 Beton Plat Atap
- Beton K 300 m3 9.70 - -
- Pembesian kg 1,304.89 - -
- Begesting 2x Pakai m2 52.94 - -
- Expose Beton m2 236.37 112,500.00 26,591,625.00
10 Dinding
- Beton K 300 m3 65.94 - -
- Pembesian kg 18,208.20 - -
- Begesting 2x Pakai m2 814.11 - -
- Pekerjaan Tie Rod pada Bekisting Vertikal m' 221.00 59,186.25 13,080,161.25
- Waterproofing m2 186.60 - -
11 Beton Tangga
- Beton K 300 m3 2.26 - -
- Pembesian kg 1,451.77 - -
- Begesting 2x Pakai m2 39.11 - -
- Expose Beton m2 39.11 112,500.00 4,399,875.00
Jumlah 2 #REF!

3 Pekerjaan Pasangan dan Plesteran


1 Pekerjaan Pasangan Batu Kosong m3 1.65 - -
2 Pekerjaan Pasangan Batu Kali 1:4 m3 11.34 - -
3 Pekerjaan PasanganDinding Bata 1:2 m2 15.94 - -
4 Pekerjaan PasanganDinding Bata 1 PC : 4 Ps m2 260.09 - -
5 Pekerjaan Plesteran Dinding 1:2 m2 31.87 - -
6 Pekerjaan Plesteran Dinding 1 PC : 5 Ps m2 519.54 - -
7 Pekerjaan Acian Dinding m2 2,275.72 - -
8 Pekerjaan Water Proofing m2 1,061.72 - -
9 Pekerjaan Water Stop PVC W 300 mm m' 257.58 - -
10 Pek. Pasangan Bata/paras Gosok (Style Bali) m2 98.44 427,910.93 42,123,551.46
11 Ornamen Ukir Style Bali m2 0.24 975,000.00 234,000.00
12 Pekerjaan pengecetan dinding m2 1,034.88 - -
13 Pasangan keramik 40 x 40 m2 111.21 - -
14 Pekerjaan Pasangan Pepalihan Style Bali m2 259.11 427,910.93 110,875,999.78
15 Pekerjaan Plafond Gypsum Rangka Hollow m2 86.23 - -
16 Pekerjaan list Plafond m' 90.87 - -
17 Pengecatan Palfond m2 86.23 - -
18 Meni dan Cat Besi m2 74.56 - -
19 Pekerjaan Beton Sloope, Ring Balk & Kolom Praktis m3 2.11 - -
20 Pekerjaan Toilet
- Instalasi Plumbing Air Bersih m' 15.00 58,500.00 877,500.00
- Instalasi Plumbing Air Kotor m' 10.00 315,232.50 3,152,325.00
- Closet duduk m' 1.00 3,800,362.50 3,800,362.50
- Pasang Zink bh 1.00 2,925,037.50 2,925,037.50
- Pasang Floor Drain bh 1.00 439,395.00 439,395.00
- Pasang Kran air bh 2.00 308,775.00 617,550.00
- Pekerjaan Pas. Keramik dinding 20 x 60 m2 9.74 - -
- Pekerjaan Pas. Keramik lantai 30 x 30 m2 1.77 - -
- Pekerjaan Pas. Keramik plin 10 x 40 m2 70.97 - -
- Pekerjaan Septick Tank dan peresapan bh 1.00 2,500,000.00 2,500,000.00
Jumlah 3 167,545,721.23

4 Pekerjaan Kusen, Pintu, Jendela dan Relling


1 Pekerjaan Kusen Pintu dan Jendela Aluminium m' 71.040 - -
2 Pekerjaan Daun jendela kaca frame aluminium m2 9.23 853,387.50 7,876,766.63
3 Daun Pintu bingkai Allumunium m2 8.72 - -
4 Pekerjaan Pintu Harmonika m' 1.00 4,500,000.00 4,500,000.00
5 Pasang Engsel Pintu set 7.50 - -
6 Pasang Kunci Pintu m' 5.00 585,000.00 2,925,000.00
7 Pasang Engsel Jendela m2 8.00 - -
8 Pasang Grendel Jendela m2 8.00 - -
9 Pasang penutup manhole plat besi T=1.2 MM set 3.00 Err:509 Err:509
10 Pekerjaan Railing pasang 198.92 Err:509 Err:509
Jumlah 4 Err:509

PEKERJAAN BANGUNAN PENGELOLA

M2 168.22 Err:509
III PEKERJAAN BANGUNAN PENGELOLA
Err:509
HARGA PER M2
1 Pekerjaan Tanah
1 Galian Tanah dengan excavator m3 3,894.34 - -
2 Pengukuran dan Bouwplank m' 134.16 - -
3 Urugan Tanah Kembali dengan Pemadatan m3 379.58 - -
4 Urugan Pasir t = 10 cm m3 58.01 - -
Jumlah 1 -
2 Pekerjaan Beton
1 Pekerjaan Beton Rabat Campuran 1 Pc : 3 Ps : 5 Kr m3 4.91 - -
2 Pekerjaan Beton Pondasi Plat Kaki R. Pengelola
- Beton Cor K-300 m3 9.07 - -
- Pekerjaan Besi Beton Kg 1,162.15 - -
- Pekerjaan Begesting 2 X pakai m2 30.24 - -
3 Beton Kolom Lt 1 R. Pengelola
- Beton Cor K-300 m3 9.73 - -
- Pekerjaan Besi Beton Kg 2,040.45 - -
- Pekerjaan Begesting 2 X pakai m2 129.70 - -
4 Balok Sloof ( S1 dan SP ) R. Pengelola
- Beton Cor K-300 m3 6.67 - -
- Pekerjaan Besi Beton Kg 1,838.41 - -
- Pekerjaan Begesting 2 X pakai m2 54.65 - -
5 Balok Lantai 1 ( B1 & TP ) R.Pengelola
- Beton Cor K-300 m3 6.93 - -
- Pekerjaan Besi Beton Kg 2,180.54 - -
- Pekerjaan Begesting 2 X pakai m2 79.90 - -
6 Beton Balok Lt.2 R. Pengelola
- Beton Cor K-300 m3 5.63 - -
- Pekerjaan Besi Beton Kg 1,153.03 - -
- Pekerjaan Begesting 2 X pakai m2 59.67 - -
7 Beton Plat Lantai 2 R. Pengelola
- Beton Cor K-300 m3 9.52 - -
- Pekerjaan Besi Beton Kg 1,480.58 - -
- Pekerjaan Begesting 2 X pakai m2 79.33 - -
8 Beton Plat Lantai 2 R. Pengelola ( T10-01)
- Beton Cor K-300 m3 6.31 - -
- Pekerjaan Besi Beton Kg 606.63 - -
- Pekerjaan Begesting 2 X pakai m2 91.08 - -
9 Beton Tangga R. Pengelola
- Beton Cor K-300 m3 2.63 - -
- Pekerjaan Besi Beton Kg 762.98 - -
- Pekerjaan Begesting 2 X pakai m2 20.78 - -
10 Beton Kolom Lt 2 R. Pengelola
- Beton Cor K-300 m3 6.44 - -
- Pekerjaan Besi Beton Kg 1,367.89 - -
- Pekerjaan Begesting 2 X pakai m2 85.85 - -
11 Beton Ring Balok R. Pengelola
- Beton Cor K-300 m3 2.89 - -
- Pekerjaan Besi Beton Kg 642.62 - -
- Pekerjaan Begesting 2 X pakai m2 31.35 - -
12 Beton Kolom Praktis R. Pengelola
- Beton Cor K-300 m3 0.81 - -
- Pekerjaan Besi Beton Kg 267.29 - -
- Pekerjaan Begesting 2 X pakai m2 21.56 - -
Jumlah 2 -

3 Pekerjaan Pasangan dan Dinding


1 Pekerjaan Dinding Pasangan Bata 1:4 m2 272.67 - -
2 Pekerjaan Dinding Pasangan Bata 1:2 m2 39.10 - -
3 Pekerjaan Plesteran 1:4 m2 545.34 - -
4 Pekerjaan Plesteran 1:2 m2 78.20 - -
5 Pekerjaan Acian Dinding m2 623.54 - -
6 Pekerjaan Pas. Keramik Lantai 40 x 40 m2 149.56 - -
7 Pekerjaan lantai keramik stepnozing m1 24.50 55,097.63 1,349,891.81
8 Pek. Pasangan Bata/paras Gosok (Style Bali) m2 105.40 427,910.93 45,102,667.32
9 Ornamen ukir style bali m2 13.93 975,000.00 13,577,070.00
10 Pekerjaan Pasangan Batu Kosong m3 14.04 - -
11 Pekerjaan Pondasi Batu Kali m3 45.59 - -
12 Pekerjaan Pas. Keramik dinding 20 x 60 m2 33.13 - -
13 Pek. Pas Keramik Lantai 30 x 30 Cm m2 6.56 - -
14 Pekerjaan Pas. Keramik plin 10 x 40 m1 110.46 - -
15 Pekerjaan Pasangan Pepalihan Style Bali m2 219.86 427,910.93 94,081,030.86
Jumlah 3 154,110,659.99

4 Pekerjaan Kusen, Pintu dan Jendela


1 Pekerjaan Kusen Pintu dan Jendela Aluminium m 203.00 - -
2 Pekerjaan Kusen Pintu Kayu Kamfer m³ 5.65 - -
3 Talang air hujan m 17.18 326,898.00 5,616,107.64
4 Daun Pintu bingkai Allumunium m2 14.81 - -
5 Daun Pintu Kamfer m2 2.57 - -
6 Jendela Kaca Bingkai Alumunium m2 42.04 853,387.50 35,872,996.95
7 Pasang Engsel Pintu pasang 20.00 - -
8 Pasang Engsel Jendela pasang 32.00 - -
9 Pasang Kunci Pintu pasang 8.00 585,000.00 4,680,000.00
10 Pasang Grendel Jendela pasang 32.00 - -
11 Pasang Kait Angin pasang 32.00 - -
Jumlah 4 46,169,104.59

5 Pekerjaan Atap dan Plafond


1 Pekerjaan Kuda-Kuda Baja Profil kg 7,036.47 - -
2 Jarum Keras bh 4.00 22,500.00 90,000.00
3 Treckstang m' 26.88 37,455.63 1,006,807.33
4 Baut Angkur M22 Penjangkaran 1000 mm bh 56.00 129,419.40 7,247,486.40
5 Plat Andas 300 x 300 x 18 mm bh 14.00 430,342.32 6,024,792.54
6 Pasang Rangka Usuk dan Reng Kayu Kamfer m2 215.44 - -
7 Pasang Atap Genteng Keramik glasur m2 247.95 - -
8 Pasang Genteng Bubungan Keramik glasur m 56.93 - -
9 Pek. Pasang Listplank Kayu kanfer Profil m 72.80 - -
10 Murda Paras Ukir unit 3.00 - -
11 Ikut Celedu Paras Ukir unit 8.00 - -
12 Pekerjaan Plafond Gypsum Rangka Hollow m2 135.38 - -
13 Pekerjaan list Plafond m 152.78 - -
14 Pekerjaan Railing Tangga dan Balkon (Stainless Steel) m 8.87 Err:509 Err:509
15 Pek. Lambesering m2 72.21 - -
16 Pek. List Plafond Lambesering m 67.12 - -
Jumlah 5 Err:509

6 Pekerjaan Finishing
1 Pekerjaan Pengecatan Dinding Luar m2 201.79 - -
2 Pekerjaan Pengecatan Dinding Dalam m2 478.79 - -
3 Pekerjaan Pengecatan Plafond m2 135.38 - -
4 Pekerjaan Polituran Listplank m2 73.33 - -
5 Pekerjaan Pengecatan Rangka Baja m2 343.60 - -
6 Pekerjaan Polituran Lambesering m2 72.21 - -
Jumlah 6 -

7 Pekerjaan Toilet
1 Instalasi Plumbing Air Bersih m 25.00 58,500.00 1,462,500.00
2 Instalasi Plumbing Air Kotor m 36.00 315,232.50 11,348,370.00
3 Closet duduk bh 2.00 3,800,362.50 7,600,725.00
4 Pasang Washtafel set 2.00 1,737,336.15 3,474,672.30
5 Pasang Floor Drain set 2.00 439,395.00 878,790.00
6 Pasang Kran air set 4.00 308,775.00 1,235,100.00
Jumlah 7 26,000,157.30

BANGUNAN KIMIA (PEKERJAAN SIPIL )

M2 219.24 212,508,663.56
I BANGUNAN KIMIA (PEKERJAAN SIPIL )
M2 969,296.95
HARGA PER M2

300 6,319,928,473.72
I BANGUNAN KIMIA (PEK. M &E)
21,066,428.25
HARGA PER M2
1 Pekerjaan Tanah
1 Pengukuran dan Pasang Bowplank m' 81.57 - -
2 Galian Tanah dengan Excavator m3 50.00 - -
3 Galian Tanah Pondasi Foot Plat dan Pondasi Menerus m3 441.92 - -
4 Urugan Tanah Kembali dengan Pemadatan m3 336.06 - -
5 Urugan Pasir m3 33.41 - -
Jumlah 1 -

2 Pekerjaan Beton
1 Lantai Kerja K 125 ( 1 pc : 3 ps : 5 Kr) m3 12.61 - -
2 Pondasi Beton Plat Kaki
- Beton K 300 m3 8.24 - -
- Pembesian kg 2,071.91 - -
- Begesting Batako m2 26.40 - -
3 Beton Standing Colum
- Beton K 300 m3 4.73 - -
- Pembesian kg 1,712.90 - -
- Begesting 2x Pakai m2 63.00 - -
4 Balok Dasar Sloof
- Beton K 300 m3 13.66 - -
- Pembesian kg 3,403.30 - -
- Begesting 2x Pakai m2 96.03 - -
5 Beton Kolom
- Beton K 300 m3 10.46 - -
- Pembesian kg 2,223.57 - -
- Begesting 2x Pakai m2 139.95 - -
6 Beton Balok
- Beton K 300 m3 22.00 - -
- Pembesian kg 4,898.65 - -
- Begesting 2x Pakai m2 147.46 - -
### 7 Plat Atap
- Beton K 300 m3 29.72 - -
- Pembesian kg 3,308.07 - -
- Begesting 2x Pakai m2 247.64 204,027.25 50,525,308.19
8 Beton Dudukan Tabung dan Bak Pencampur
- Beton K 300 m3 32.34 - -
- Pembesian kg 2,584.84 - -
- Begesting 2x Pakai m2 114.64 204,027.25 23,389,683.94
9 Beton Kolom dan Sloop Praktis
- Beton K 300 m3 1.49 - -
- Pembesian kg 422.20 - -
- Begesting 2x Pakai m2 20.50 - -
10 Beton Lisplank
- Beton K 300 m3 4.02 - -
- Pembesian kg 1,031.04 - -
- Begesting 2x Pakai m2 67.00 - -
Jumlah 2 73,914,992.13

3 Pekerjaan Pasangan dan Pelapis


1 Pekerjaan Pasangan Batu Kosong m3 25.61 - -
2 Pekerjaan Pasangan Batu Kali 1:4 m3 43.21 - -
3 Pekerjaan PasanganDinding Bata 1:2 m2 25.71 - -
4 Pekerjaan PasanganDinding Bata 1 PC : 4 Ps m2 278.97 - -
5 Pekerjaan Plesteran Dinding 1:2 m2 51.20 - -
6 Pekerjaan Plesteran Dinding 1 PC : 5 Ps m2 560.82 - -
7 Pekerjaan Acian Dinding m2 823.54 - -
8 Pekerjaan Pasangan Keramik Lantai 40 x 40 cm m2 186.83 - -
9 Pekerjaan Water Proofing m2 327.68 - -
10 Pek. Pasangan Bata/paras Gosok (Style Bali) m2 39.68 427,910.93 16,977,793.86
11 Pekerjaan Pasangan Pepalihan Style Bali m2 129.32 427,910.93 55,338,724.55
12 Ornamen ukir style bali m2 5.84 975,000.00 5,694,000.00
13 Pekerjaan Lapisan Fiber Glass (2 x Lapis) m2 129.76 230,813.00 29,950,294.88
14 Pekerjaan Plafond Gypsum Rangka Hollow m2 210.84 - -
15 Pekerjaan list Plafond m 113.80 - -
16 Pek. Pasangan Keramik Dinding KM 20 x 25 Cm m2 66.59 - -
17 Pekerjaan Beton Sloope, Ring Balk & Kolom Praktis m3 2.70 - -
18 Pekerjaan Toilet
- Instalasi Plumbing Air Bersih m 20.00 58,500.00 1,170,000.00
- Instalasi Plumbing Air Kotor m 15.00 315,232.50 4,728,487.50
- Closet duduk bh 1.00 3,800,362.50 3,800,362.50
- Pasang Washtafel set 1.00 1,737,336.15 1,737,336.15
- Pasang Floor Drain set 1.00 439,395.00 439,395.00
- Pasang Kran air set 1.00 308,775.00 308,775.00
- Pekerjaan Pas. Keramik dinding 20 x 60 m2 11.94 - -
- Pekerjaan Pas. Keramik plin 10 x 40 m1 55.68 - -
- Pekerjaan Pas. Keramik lantai 30 x 30 m2 33.53 159,946.14 5,362,994.04
- Pekerjaan Septick Tank dan peresapan unit 1.00 2,500,000.00 2,500,000.00
- Pompa Air Bersih unit 1.00 1,750,000.00 1,750,000.00
Jumlah 3 129,758,163.48

4 Pekerjaan Kusen, Pintu, Jendela dan Relling


1 Pekerjaan Kusen Pintu dan Jendela Aluminium m 78.310 - -
2 Pekerjaan Daun Pintu Aluminium m2 5.40 - -
3 Pekerjaan Daun Jendela Aluminium Panil Kaca m2 2.46 853,387.50 2,099,333.25
4 Pekerjaan Daun Jendela Jalusi m2 9.95 250,000.00 2,487,500.00
5 Pekerjaan Kusen Pintu Besi Profil C NP m 19.80 - -
6 Pekerjaan Daun Pintu Besi rangka L 50.50.5 m2 23.01 - -
7 Pasang Engsel Pintu pasang 4.50 - -
8 Pasang Engsel Jendela pasang 2.00 - -
9 Pasang Kunci Pintu pasang 3.00 585,000.00 1,755,000.00
10 Pasang Grendel Jendela pasang 1.00 - -
11 Pasang Kait Angin pasang 2.00 - -
12 Pasang Engsel Pintu baja As 1" pasang 8.00 222,463.73 1,779,709.80
13 Pasang Kunci Pintu Baja pasang 2.00 222,463.73 444,927.45
14 Pasang Grendel Tanam untuk Pintu baja Set 2.00 134,518.73 269,037.45
15 Pasang Kait Angin bh 36.00 - -
Jumlah 4 8,835,507.95

5 Pekerjaan Cat
1 Meni dan Cat Besi m2 28.32 - -
2 Plamur dan Cat Tembok m2 775.80 - -
3 Pekerjaan Pengecatan Plafond m2 210.84 - -
Jumlah 5 -

6 Pengadaan Mekanikal dan aksesoris


Crane untuk Ruang Kimia
Motor Hoist crane, Kapasitas 1 ton, lengkap dengan span, flat bar,
set 1.00 18,355,920.00 18,355,920.00
conductor dan pendant ( R.Kimia )push button
Motor Hoist crane, Kapasitas 2,5 ton, lengkap dengan span, flat bar,
set 1.00 26,922,016.00 26,922,016.00
conductor dan pendant ( R. Chlor ) push button
Pompa Dosing dan pengaduk
Mixer 580 rpm, Drive: 4kW, 380V, dilengkapi dengan gear, reducer,
set 4.00 51,396,576.00 205,586,304.00
stainless steel shaft support, control dan drain oil.
Pompa dozing alum Q = 250 l/jam; P=6,9 bar, Motor = 1,1kW, 380V, 3
unit 4.00 22,027,104.00 88,108,416.00
phase
Pompa dosing soda ash Q = 450l/jam; P = 6,9 bar, Motor = 0,55kW,
unit 4.00 22,027,104.00 88,108,416.00
380V, 3 phase
Pengadaan dan pemasangan local control panel Type metal (zonc alloy),
LS 4.00 3,671,184.00 14,684,736.00
IP 65, 4 lubang, komplit pust button start - stop, Ukuran 80 x 130 mm
441,765,808.00

7 Pemasangan mekanikal dan aksesoris


Crane untuk Ruang Kimia
Motor Hoist crane, Kapasitas 1 ton, lengkap dengan span, flat bar,
set 1.00 3,671,184.00 3,671,184.00
conductor dan pendant ( R.Kimia )push button
Motor Hoist crane, Kapasitas 2,5 ton, lengkap dengan span, flat bar,
set 1.00 5,384,403.20 5,384,403.20
conductor dan pendant ( R. Chlor ) push button
Pompa Dosing dan pengaduk
Mixer 580 rpm, Drive: 4kW, 380V, dilengkapi dengan gear, reducer,
set 4.00 2,936,947.20 11,747,788.80
stainless steel shaft support, control dan drain oil.
Pompa dozing alum Q = 250 l/jam; P=6,9 bar, Motor = 1,1kW, 380V, 3
unit 4.00 1,762,168.32 7,048,673.28
phase
Pompa dosing soda ash Q = 450l/jam; P = 6,9 bar, Motor = 0,55kW,
unit 4.00 1,762,168.32 7,048,673.28
380V, 3 phase
34,900,722.56

8 Pengadaan Elektrikal dan aksesoris


Panel utama / control Pompa Dosing Kimia (M-PK)
1. Box Panel Pompa Air Bersih, dan Kelengkapannya : Water Level
Control (WLC), Buzzer, unit 1.00 11,454,094.08 11,454,094.08
Hour Counter, RCP, Amperemeter, Voltmeter, Pilot Lamp,
2. Bus Bar 3P+N/125A +PE dan acessories set 1.00 1,468,473.60 1,468,473.60
3. MCCB 3P(100-125)A 36KA + electronic trip set 1.00 3,315,813.39 3,315,813.39
4. MCCB 3P(252-630)A 50KA + Micrologic 2,0 manually operated set 1.00 9,568,574.00 9,568,574.00
4. MCB 2P/25 A, 10 KA unit 2.00 624,101.28 1,248,202.56
5. MCB 2P/16 A, 10 KA unit 1.00 624,101.28 624,101.28
6. MCB 4P/20 A, 10 KA unit 1.00 745,984.59 745,984.59
7. Relay arus bocor (Modul Vigi) 4P, 40A, Sensitivitas = 300 mA unit 1.00 396,487.87 396,487.87
8. MCB 3P/20 A, 10 KA unit 1.00 609,416.54 609,416.54
9. MCB 3P/25 A, 10 KA unit 1.00 609,416.54 609,416.54
10. Isolating switch, 380 V, 3P, 40A unit 2.00 396,487.87 792,975.74
11. Voltmeter (0-500)V, Uk 72x72 U 1.00 396,487.87 396,487.87
12. VS (Voltage Selector switch, 7 posisi) U 1.00 293,694.72 293,694.72
13. DOL Starting Motor 0.55kW, 3 komponen, type high performance set 4.00 161,532.10 646,128.38
14. DOL Starting Motor 1.1 kW, 3 komponen, type high performance set 4.00 161,532.10 646,128.38
15. DOL Starting Motor 4 kW, 3 komponen, type high performance set 4.00 161,532.10 646,128.38
16. Fuse carrier (STI), 2P (1P + N), lengkap dengan tabung sekring (fuse
catrige), type aM, set 12.00 277,541.51 3,330,498.12
Ukuran 10,3x38mm, 2A, 500V, 80kA
17. Buzzer, 70 dBA unit 1.00 183,559.20 183,559.20
18. RCP (Relay Vontrol Phase) untuk unbalanced/missing phase 2 kontak
output C/O, Delay unit 2.00 456,695.29 913,390.58
(0.1-10) detik, (380-500)V
19. Plug in relay 220V, 14 pin, 4 kontak C/O, 5 amp, built in pilot light,
unit 24.00 170,342.94 4,088,230.50
komplit dengan dudukan
20. Water Level Control (WLC), Time delay (0.1-10)detik, sensitifitas
unit 4.00 550,677.60 2,202,710.40
(5-100) kOhm dilengkapi dengan probe (sensor)
21. Pilot lamp, Ø 22 mm plastic 220-240 VAC unit 36.00 36,711.84 1,321,626.24
22. Push button Ø 22 mm flush, plastic (reset) unit 2.00 51,396.58 102,793.15
23. Plug dan Socket 2P + E 16A, 220 VAC, Panel mounted, komplit set 1.00 215,865.62 215,865.62
24. Plug dan Socket 3P + N + E 16A, 380 VAC, Panel mounted, komplit set 1.00 215,865.62 215,865.62
Panel Penerangan Ruang Kimia (PP-RK)
Box plastic mini pragma pintu transparant, inbow, 2 baris, 24 modul
Ukuran 475 (T) x 350 (L)x 100 (Tb) mm, termasuk blok terminal dan Unit 1.00 1,116,039.94 1,116,039.94
MCB
2. MCB 3P/16A 10 KA unit 1.00 624,101.28 624,101.28
3. RCCB/ELCB, 4P, 25A, Sensitifitas : 30 mA unit 1.00 1,615,320.96 1,615,320.96
4. MCB 1P/6A 6 KA unit 3.00 88,108.42 264,325.25
5. MCB 1P/10A 6 KA unit 1.00 88,108.42 88,108.42
Penerangan Ruang Kimia
1. Lampu Phillips 36W/220V, WP (water proof) unit 15.00 318,658.77 4,779,881.57
2. Single switch 10 A/ 220V unit 6.00 83,703.00 502,217.97
3. Double switch 10 A/ 220V unit 3.00 143,910.41 431,731.24
4. Outlet 10A/2P+E, 220V, WP (water proof) unit 3.00 230,550.36 691,651.07
5. Kabel NYM 3 x 2,5 mm2 m 100.00 16,275.58 1,627,558.24
6. Konduit 20 mm m 75.00 11,013.55 826,016.40
7. Konduit 25 mm m 2.00 18,355.92 36,711.84
8. Exhaust fan, Industrial type, wall mounted, Kap. 2760m3/hr, 115 watt, 5,139,657.60
set 2.00 2,569,828.80
220V, 1440 pm/14", komplit base frame -
Penangkal Petir Bangunan Kimia
Penangkal Petir type Elctrode dengan Rmin = 60m LS 1.00 - -
1. BC 50 mm2 kg 82.00 183,559.20 15,051,854.40
2. Clamp BC, 50 mm2 unit 425.00 36,711.84 15,602,532.00
3. Air terminal Ø 1, termasuk dudukan, komplit set 12.00 624,101.28 7,489,215.36
4. GIP Ø 2 termasuk socket set 4.00 602,074.18 2,408,296.70
5. Grounding rod 3/4 set 4.00 256,982.88 1,027,931.52
6. Pipa PVC Ø 1, termasuk clamp set 4.00 264,325.25 1,057,300.99
7. Box control 30x30x70 cm LS 4.00 770,948.64 3,083,794.56
Peralatan elektroklorinasi
1. Onsite Chlorine Disinfectant Generator kap. 4 kg.Cl/jam, termasuk sel
Unit 2.00 2,214,000,000.00 4,428,000,000.00
elektroda, power module, dan terminal control
2. Inline water filter kap. 4 m3/jam, tekanan kerja 3-6 bar Unit 2.00 38,400,000.00 76,800,000.00
3. Water softener dg hardness monitoring system Unit 2.00 16,000,000.00 32,000,000.00
4. Water chiller system, termasuk power control Unit 2.00 96,000,000.00 192,000,000.00
5. Submersible pump kap. 2500 L/jam, tekanan 5 bar, termasuk power contr Unit 2.00 32,000,000.00 64,000,000.00
6. HDPE Brine tank kap. 4 m3, termasuk drain, corong inlet garam, soft
Unit 2.00 32,000,000.00 64,000,000.00
water inlet with automated magnetic valve, brine outlet, overflow
7. HDPE brine tnak kap. 0,5 m3, termasuk inlet, outlet, drain, dan overflow Unit 2.00 8,000,000.00 16,000,000.00
8. Brine dosing pump, kap. Min. 100 L/jam, tekanan 5 bar, termasuk
Unit 4.00 48,000,000.00 192,000,000.00
control panel, push button, indicator light, integrated control ready
9. HDPE Production tank 30 m3, dilengkapi dengan water level sensor Unit 1.00 416,000,000.00 416,000,000.00
10. Power stabiliser kap. 30 kVA Unit 2.00 28,000,000.00 56,000,000.00
5,646,300,894.68
9 Pemasangan Elektrikal dan aksesoris
Panel utama / control Pompa Dosing Kimia (M-PK)
Perakitan dan Pemasangan lengkap termasuk aksesoris set 1.00 734,236.80 734,236.80
Panel Penerangan Ruang Kimia (PP-RK)
Perakitan dan Pemasangan lengkap termasuk aksesoris set 1.00 734,236.80 734,236.80
Penerangan Ruang Kimia
1. Lampu Phillips 36W/220V, WP (water proof) unit 15.00 36,711.84 550,677.60
4. Outlet 10A/2P+E, 220V, WP (water proof) unit 3.00 36,711.84 110,135.52
8. Exhaust fan, Industrial type, wall mounted, Kap. 2760m3/hr, 115 watt,
set 2.00 220,271.04 440,542.08
220V, 1440 pm/14", komplit base frame
4. Titik Lampu titik 15.00 66,081.31 991,219.68
Penangkal Petir Bangunan Kimia
Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 - -
Peralatan elektroklorinasi
1. Pemasangan perpipaan sistem elektroklorinasi LS 1.00 10,200,000.00 10,200,000.00
12. Pemasangan pengkabelan sistem elektroklorinasi LS 1.00 20,000,000.00 20,000,000.00
3. Pemasangan sistem pembubuhan larutan klorin LS 1.00 96,000,000.00 96,000,000.00
4. Pemrograman sistem kendali setempat dan kendali jarak jauh, berikut
LS 1.00 44,800,000.00 44,800,000.00
piranti lunak
5. Pengujian komisioning dan pelatihan minimal 5 hari, termasuk
LS 1.00 22,400,000.00 22,400,000.00
dokumentasi dan manual operasi pemeliharaan
196,961,048.48

PEKERJAAN BANGUNAN IPAL untuk 300lt/dt

M2 170.25 Err:509
I PEKERJAAN BANGUNAN IPAL untuk 300lt/dt
Err:509
HARGA PER LTR/DTK
1 Pekerjaan Tanah
1 Pengukuran dan Pasang Bowplank m' 83.20 - -
2 Galian Tanah dengan Excavator m3 644.07 - -
3 Urugan Tanah Kembali dengan Pemadatan m3 77.75 - -
4 Urugan Pasir m3 282.10 - -
5 Kerikil Halus gradasi butiran Ø 0.3 - 1.75 Cm m3 44.32 300,447.00 13,316,562.16
6 Pasir Halus gradasi butiran Ø 0.4 - 0.7 mm m3 46.80 263,188.50 12,317,221.80
Jumlah 1 25,633,783.96

2 Pekerjaan Beton
1 Lantai Kerja K 125 ( 1 pc : 3 ps : 5 Kr) m3 11.46 - -
2 Beton Plat Lantai
- Beton K 300 m3 65.09 - -
- Pembesian kg 6,979.94 - -
3 Pekerjaan Beton Dinding dan Saluran
- Beton K 300 m3 53.19 - -
- Pembesian kg 8,766.01 - -
- Begesting 2x Pakai m2 412.29 - -
Jumlah 2 -

3 Pekerjaan Lain-Lain
1 Pekerjaan Baja Profil I WF 250 X 125 X 5 mm Kg 807.47 - -
2 Pekerjaan Baja Profil I NP 60 Kg 177.24 - -
3 Pekerjaan Grill Penutup Besi strip 30 x 3 mm m2 14.03 3,000,000.00 42,090,000.00
4 Pekerjaan Pintu Air Unit 9.00 20,910,000.00 188,190,000.00
5 Baut Angkur M22 Penjangkaran 1000 mm bh 24.00 129,419.40 3,106,065.60
6 Plat Andas 300 x 300 x 18 mm bh 6.00 430,342.32 2,582,053.95
7 Railling Balkon dan Tangga (Pipa Black Steel) m' 37.29 Err:509 Err:509
8 Meni dan Cat Besi m2 41.58 - -
Jumlah 3 Err:509

PEKERJAAN IPA KAPASITAS 300 LT/DT (SIPIL)

#REF!
I PEKERJAAN IPA KAPASITAS 300 LT/DT (SIPIL)
#REF!
HARGA PER LTR/DTK

999,273,240.00
PEKERJAAN IPA KAPASITAS 300 LT/DT (M&E)
3,330,910.80
HARGA PER LTR/DTK

1 Pekerjaan Tanah
1 Pengukuran dan Pasang Bowplank m' 132.70 - -
2 Galian Tanah dengan Excavator m3 3,838.17 - -
3 Galian Tanah Pondasi Plat Kaki dan Pondasi Menerus m3 436.89 - -
4 Urugan Tanah Kembali dengan Pemadatan m3 6.00 - -
5 Urugan Pasir m3 82.62 - -
Jumlah 1 -

2 Pekerjaan Pasangan dan Beton


1 Pekerjaan Pasangan Batu Kosong m3 4.45 - -
2 Pekerjaan Pasangan Batu Kali Campuran 1 : 4 m3 7.08 - -
3 Lantai Kerja K 125 ( 1 pc : 3 ps : 5 Kr) m3 28.84 - -
4 Pekerjaan Beton Bor Pile
- Galian Tanah dengan Bor m' 200.00 #REF! #REF!
- Beton K 300 m3 20.34 - -
- Pembesian kg 3,743.16 - -
5 Pekerjaan Beton Pondasi Plat Kaki
- Beton K 300 m3 75.61 - -
- Pembesian kg 14,190.63 - -
- Begesting Batako m2 493.66 - -
6 Pekerjaan Beton Standing Colum
- Beton K 300 m3 0.84 - -
- Pembesian kg 111.59 - -
- Begesting 2x Pakai m2 5.34 - -
7 Pekerjaan Beton Sloop
- Beton K 300 m3 0.84 - -
- Pembesian kg 111.59 - -
- Begesting 2x Pakai m2 5.34 - -
8 Pekerjaan Beton Lantai
- Beton K 300 m3 251.65 - -
- Pembesian kg 59443.97 - -
- Begesting 2x Pakai m2 54.57 - -
9 Pekerjaan Beton Dinding, Gutter, dan Plat Jalan Setapak
- Beton K 300 m3 839.30 - -
- Pembesian kg 100,032.99 - -
- Begesting 2x Pakai m2 4,883.65 - -
- Tie Rot m' 978.00 59,186.25 57,884,152.50
- Water Sttop W 300 mm m' 1,267.14 - -
10 Pekerjaan Beton Balok
- Beton K 300 m3 21.26 - -
- Pembesian kg 3,645.15 - -
- Begesting 2x Pakai m2 445.69 - -
11 Pekerjaan Beton Plat Atap
- Beton K 300 m3 79.95 - -
- Pembesian kg 7,619.59 - -
- Begesting 2x pakai m2 316.12 - -
12 Pekerjaan Acian Dinding m2 1,193.70 - -
Jumlah 2 #REF!

3 PEKERJAAN RANGKA BAJA DAN ATAP


1 Pekerjaan Rangka Atap Baja WF kg 8,447.39 - -
2 Pekerjaan Gording Canal kg 2,332.84 - -
3 Pekerjaan Atap Genteng m2 273.81 - -
4 Pekerjaan Bubungan m' 47.53 - -
5 Pekerjaan Relling Tangga dan Balkon m 383.73 Err:509 Err:509
6 Plat Andas bh 14.00 430,342.32 6,024,792.54
7 Baut Angkur M22 Penjangkaran 1000 mm bh 56.00 129,419.40 7,247,486.40
8 Jarum Keras bh 12.00 22,500.00 270,000.00
9 Treckstank m' 58.83 37,455.63 2,203,514.71
10 Pekerjaan Pasang Lisplank m' 92.54 - -
11 Pekerjaan Usuk dan Reng Baja Ringan m2 273.81 283,932.72 77,743,617.35
12 Mur baut A 325 M 20 set 200.00 54,229.50 10,845,900.00
13 Mur baut A 325 M 16 set 698.00 40,170.00 28,038,660.00
14 Mur baut NC M 12 set 312.00 32,250.00 10,062,000.00
15 Mur NC M 12 set 216.00 17,250.00 3,726,000.00
16 Pengadaan dan Pemasangan Extended Stem Valve Unit 12.00 3,250,312.50 39,003,750.00
Jumlah 3 Err:509

4 Pekerjaan Kusen Pintu dan Jendela


12 Pekerjaan Penutup Man Hole Plat Besi T=1,2 mm bh 7.00 Err:509 Err:509
13 Pekerjaan Grill Penutup Besi Strip 30x3 mm m2 25.89 3,000,000.00 77,670,000.00
Jumlah 4 Err:509
5 Pekerjaan Finishing
1 Pekerjaan Pengecatan Dinding m2 - -
2 Pekerjaan Politur Lisplank m2 69.41 - -
3 Pekerjaan Pengecatan Rangka Baja m2 459.97 - -
4 Pekerjaan Pasangan Style Bali m2 975,000.00 -
5 Ornamen Ukir Style Bali m2 15.24 975,000.00 14,859,000.00
6 Pekerjaan Waterproofing m2 1,818.86 - -
7 Pekerjaan Pasangan Keramik Lantai m2 18.43 - -
8 Meni dan Cat Besi m2 - -
9 Pekerjaan Lapis Keramik pada Gutter m2 94.64 - -
Jumlah 5 14,859,000.00

Pengadaan dan Pemasangan Mekanikal dan aksesoris pada Bangunan IPA

Pengadaan dan Pemasangan Mekanikal dan aksesoris pada Bangunan IPA -


Untuk Kapasitas 300 lt./dt

a Crane untuk Ruang Kimia


1 Electric Motor Hoist crane, Kapasitas 2 ton, lengkap dengan span, flat bar, set 1.00 66,634,820.00 66,634,820.00

b Pompa Dosing dan pengaduk


Mixer 580 rpm, Drive: 4kW, 380V, dilengkapi dengan gear, reducer, stainless steel shaft
1 set 4.00 26,855,190.00 107,420,760.00
support, control dan drain oil.
2 Pompa dozing alum Q = 250 l/jam; P=6,9 bar, Motor = 1,1kW, 380V, 3 unit 3.00 24,770,470.00 74,311,410.00
3 Pompa dosing soda ash Q = 450l/jam; P = 6,9 bar, Motor = 0,55kW, 380V, unit 3.00 81,670,760.00 245,012,280.00
4 Pengadaan dan pemasangan local control panel Type metal (zonc alloy), IP LS - 4,120,000.00 -
5 IWF Baja 150 x 300 mm Kg 910.16 13,750.00 12,514,700.00

c Crane untuk Ruang Kimia


1 Electric Motor Hoist crane, Kapasitas 2 ton, lengkap dengan span, flat bar, set 1.00 66,634,820.00 66,634,820.00

d Pompa Dosing dan pengaduk


Mixer 580 rpm, Drive: 4kW, 380V, dilengkapi dengan gear, reducer, stainless steel shaft
1 set 4.00 26,855,190.00 107,420,760.00
support, control dan drain oil.
2 Pompa dozing alum Q = 250 l/jam; P=6,9 bar, Motor = 1,1kW, 380V, 3 unit 3.00 24,770,470.00 74,311,410.00
3 Pompa dosing soda ash Q = 450l/jam; P = 6,9 bar, Motor = 0,55kW, 380V, unit 3.00 81,670,760.00 245,012,280.00

Jumlah 1 KAPASITAS 300 LT/DT 999,273,240.00

BANGUNAN RESERVOIR KAPASITAS 3000 M3

BANGUNAN RESERVOIR KAPASITAS 3000 M3 #REF!

HARGA PER M3 #REF!


1 Pekerjaan Tanah
1 Pengukuran dan Pasang Bowplank m' 115.20 - -
2 Galian Tanah dengan excavator m3 3,491.60 - -
3 Urugan Tanah Kembali dengan Pemadatan m3 138.69 - -
4 Urugan Pasir t = 10 cm m3 269.57 - -
Jumlah 1 -
2 PEKERJAAN BETON
1 Pekerjaan Pondasi Bor Pile
- Pembuatan lubang Bor Pile Ø 40 cm m 913.94 #REF! #REF!
- Beton Cor K-300 m3 114.79 - -
- besi Beton Kg 16,806.09 - -
2 Lantai Kerja K - 125 (1 PC : 3 PS : 5KR)
- Cor Beton Camp 1:3:5 m3 67.45 - -
3 Pekerjaan Beton pondasi Plat Setempat & Keliling
- Beton Cor K-300 m3 22.71 - -
- besi Beton Kg 9,428.76 - -
- Begesting Pasangan Batako m2 57.42 - -
4 Pekerjaan Sloof
- Beton Cor K-300 m3 79.80 - -
- Pekerjaan Besi Beton Kg 10,994.68 - -
- Begesting Pasangan Batako m2 638.42 - -
5 Pekerjaan Beton Lantai
- Beton Cor K-300 m3 274.31 - -
- besi Beton Kg 76,208.10 - -
- Begesting 2 X pakai m2 1,514.94 - -
6 Pekerjaan Beton Kolom
- Beton Cor K-300 m3 67.30 - -
- besi Beton Kg 13,611.06 - -
- Begesting 2 X pakai m2 782.71 - -
7 Pekerjaan Beton Dinding Basement
- Beton Cor K-300 m3 37.40 - -
- besi Beton Kg 11,049.44 - -
- Begesting 2 X pakai m2 249.32 - -
- Pekerjaan Tie Rod pada Bekisting Vertikal m1 429.00 59,186.25 25,390,901.25
8 Pekerjaan Beton Dinding Lantai 1
- Beton Cor K-300 m3 214.20 - -
- besi Beton Kg 54,212.67 - -
- Begesting 2 X pakai m2 1,514.94 - -
9 Pekerjaan Beton Balok
- Beton Cor K-300 m3 69.24 - -
- besi Beton Kg 10,500.49 - -
- Begesting 2 X pakai m2 883.23 - -
10 Pekerjaan Beton Plat Atap
- Beton Cor K-300 m3 104.71 - -
- besi Beton Kg 16,850.95 - -
- Begesting 2 X pakai m2 891.00 - -
11 Pekerjaan Beton Listplang
- Beton Cor K-300 m3 9.16 - -
- besi Beton Kg 1,373.63 - -
- Begesting 2 X pakai m2 173.99 - -
12 Pekerjaan Tangga
- Beton Cor K-300 m3 3.63 - -
- besi Beton Kg 464.40 - -
- Begesting 2 X pakai m2 24.20 - -
13 Pekerjaan Dudukan Pompa dan Pipa
- Beton Cor K-300 m3 29.30 - -
- besi Beton Kg 2,482.28 - -
- Begesting 2 X pakai m2 119.06 - -
Jumlah 2 #REF!

3 PEKERJAAN PASANGAN DAN PELAPIS


1 Pekerjaan PasanganPondasi Batu Kali m3 46.98 - -
2 Pekerjaan Pas, Dinding Bata Merah m2 373.98 - -
3 Pekerjaan Pas. Batako m2 176.25 - -
4 Pekerjaan Water Proofing m2 1,412.61 - -
5 Pekerjaan Water Stop m 851.55 - -
6 Pekerjaan Water Stop m 850.52 - -
7 Pekerjaan Plesteran 1 PC : 2 Ps m2 850.52 - -
8 Pekerjaan Acian m2 166.50 - -
9 Pekerjaan expose beton m2 194.47 112,500.00 21,877,593.75
10 Meni dan cat besi m2 64.21 - -
Jumlah 3 21,877,593.75

4 PEKERJAAN KUSEN PINTU DAN RELING


1 Pekerjaan Kusen Kayu Kamper m3 0.04 - -
2 Pekerjaan Kusen Aluminium m' 60.36 - -
3 Pekerjaan Daun Pintu Panil m2 4.24 - -
4 Pekerjaan Daun Jendela m2 11.51 - -
5 Pas. Engsel Pintu bh 2.00 - -
6 Pasang Handle + Kunci Pintu bh 1.00 550,000.00 550,000.00
7 Pekerjaan Kusen Pintu Baja Profil L 70.70.6 m2 9.60 - -
8 Pekerjaan Daun Pintu Besi rangka L 50.50.5 m2 9.79 - -
9 Pasang Engsel Pintu baja As 1" pasang 8.00 222,463.73 1,779,709.80
10 Pasang Kunci Pintu Baja set 2.00 432,013.73 864,027.45
11 Pasang Grendel Tanam untuk Pintu baja pasang 2.00 134,518.73 269,037.45
12 Pekerjaan Pipa Ventilasi GIP 4" Unit 4.00 750,000.00 3,000,000.00
13 Pekerjaan Penutup Man Hole Plat Besi T= 1.2 mm Unit 4.00 Err:509 Err:509
14 Pekerjaan Tangga Inspeksi Pipa GIP Unit 2.00 Err:509 Err:509
15 Talang Air Hujan set 27.01 - -
16 Railling Balkon dan Tangga (Pipa Black Steel) m' 149.08 Err:509 Err:509
Jumlah 4 Err:509

BANGUNAN ADAT PURA

BANGUNAN ADAT PURA 1,576,365,989.26


1 Pekerjaan Tanah
1 Pengukuran dan Pasang Bowplank m' 63.46 - -
2 Urugan Tanah Biasa dipadatkan m3 384.68 - -
3 Urugan Pasir di bawah Pondasi t = 10 cm m3 4.04 - -
Jumlah 1 -

2 Pekerjaan Padmasana & Pelinggih Lain 0


1 Pekerjaan Pasangan Batu Kosong m3 1.76 - -
2 Pekerjaan Pasangan Bpondasi Batu kali 1 Pc : 5 Ps m3 12.80 - -
3 Pek. Beton Inti, dan Sloope m3 0.94 - -
4 Pek. Padmasana (Batu Tabas Karangasem) set 1.00 101,400,000.00 101,400,000.00
5 Pek. Pasangan Paving Stone/Block m2 153.93 - -
6 Pekerjaan Tugu Pelinggih Wisnu Ls 1.00 24,000,000.00 24,000,000.00
7 Pekerjaan Tugu Penunggun Karang Ls 1.00 24,000,000.00 24,000,000.00
8 Pekerjaan Penyengker Ls 1.00 952,560,000.00 952,560,000.00
9 Pekerjaan Piyasan Ls 1.00 55,380,000.00 55,380,000.00
10 Pekerjaan Penunggun Karang (Belakang) Unit 1.00 21,000,000.00 21,000,000.00
11 Railling Balkon dan Tangga (Pipa Black Steel) m 23.46 16,966,154.70 398,025,989.26
Jumlah 2 1,576,365,989.26

Pekerjaan Bangunan Pos Jaga

Pekerjaan Bangunan Pos Jaga 18,322,091.84


1 Pengukuran dan Pasang Bowplank m' 28.00 - -
2 Galian Tanah Pondasi m3 22.42 - -
3 Urugan Tanah Kembali dengan Pemadatan m3 7.47 - -
4 Urugan Pasir di bawah Pondasi & di bawah Lantait = 10 cm m3 2.75 - -
5 Pekerjaan Pasangan Batu kosong m' 2.98 - -
6 Pekerjaan Pasangan Pondasi Batu Kali 1 PC : 4 PS m3 8.66 - -
7 Pekerjaan Beton Rabat Campuran 1Pc : 3Ps : 5 Kr m3 0.89 - -
8 Pekerjaan Beton Sloope, Ring Balk & Kolom Praktis m3 5.58 - -
9 Pekerjaan Pasangan Bata Merah 1 Pc :4 Ps m2 82.15 - -
10 Pekerjaan Plesteran Tembok 1 PC : 4 PS m2 164.30 - -
11 Pekerjaan Acian Dinding m2 152.73 - -
12 Pek. Pas Keramik Lantai 30 x 30 Cm m2 4.29 - -
13 Pek. Pas Keramik Lantai KM 20 x 20 Cm Anti Slip m2 1.82 - -
14 Pek. Pas Keramik Dinding KM 20 x 25 Cm m2 13.80 - -
15 Pasang Plin Keramik 10 x 40 m 34.00 - -
16 Pasang Koloset Jongkok set 1.00 2,513,452.92 2,513,452.92
17 Pasang Bak Mandi Porselin set 1.00 1,719,868.92 1,719,868.92
18 Pasang Floor Drain set 1.00 439,395.00 439,395.00
19 Pasang Kran air set 2.00 2,500,000.00 5,000,000.00
20 Pekerjaan Septick Tank dan peresapan Ls 1.00 308,775.00 308,775.00
21 Pasangan Batu alam Random m2 15.68 420,000.00 6,585,600.00
22 Pasangan Tempelan Dinding Batu Candi m2 11.58 - -
23 Pek. Kusen Kayu Kanfer m 0.13 - -
24 Pek. Daun Pintu Panil rangka kanfer m2 4.98 - -
25 Pek. Daun Jendela Panil kaca rangka kanfer m2 2.23 - -
26 Pasang Kaca 5 mm m2 0.19 - -
27 Pasang kunci Pintu Set 3.00 585,000.00 1,755,000.00
28 Pasang Engsel Pintu pasang 5.00 - -
29 Pasang Engsel Jendela pasang 4.00 - -
30 Pasang Grendel set 4.00 - -
31 Pasang Kait Angin pasang 4.00 - -
32 Pek. Rangka atap Kayu Kanfer m3 0.36 - -
33 Pek. Pasang Usuk dan Reng Kayu Kanfer m2 22.74 - -
34 Pas Listplank kayu Kanfer m2 7.20 - -
35 Pas. Atap genteng m2 22.74 - -
36 Pas Bubungan Genteng Glazuur m' 12.29 - -
37 Murda Paras Ukir Unit 2.00 - -
38 Ikut Celedu Paras Ukir Unit 4.00 - -
39 Pekerjaan Gypsum Rangka Hollow m2 20.00 - -
40 Pekerjaan list Plafond m 68.00 - -
41 Pekerjaan Pengecatan Dinding m2 152.73 - -
42 Pekerjaan Pengecatan Plafon m2 20.00 - -
43 Pekerjaan Polituran Kusen, Pintu, Listplank m2 19.80 - -
Jumlah 18,322,091.84

Pekerjaan Pagar
Pekerjaan Pagar
1 Pengukuran dan Pasang Bowplank m' 4.00 - -
2 Galian Tanah dengan excavator m3 32.19 - -
3 Urugan Pasir di bawah Pondasi t = 10 cm m3 0.15 - -
4 Pekerjaan Pasangan Batu kosong m' 0.24 - -
5 Pekerjaan DPT Pasangan Batu Kali 1 PC : 4 PS m3 3.66 - -
6 Pekerjaan Beton Penguat DPT K-225 Fe 100 m3 0.76 4,049,335.88 3,077,495.27
7 Pekerjaan Beton Sloope, Ring Balk & Kolom Praktis m3 0.26 - -
8 Pekerjaan Plesteran Tembok 1 PC : 4 PS m2 4.94 - -
9 Pekerjaan Pagar Style Bali M1 1.00 - -
10 Pek. Paduraksa Style Bali bh - - -
11 Pek. Candi Bentar bh - -
Jumlah 3,077,495.27

Pekerjaan Halaman/Lanscape

Pekerjaan Halaman/Lanscape
1 Pengukuran dan Pasang Bowplank m' 16.00 - -
2 Galian Tanah dengan excavator m3 1.05 - -
3 Pasangan Paving Block t = 10 cm m2 1.00 - -
4 Pas. Saluran Uditch 30x30 x120 mm m' 1.00 - -
5 Pas Grill Saluran m2 0.30 1,500,000.00 450,000.00

Jumlah 450,000.00

Penyambungan Daya pada listrik PLN 1,017,000,000.00

Penyambungan Listrik PLN 1000 KVA


Uang Jaminan Pelanggan Va 1,000,000.00 117.00 117,000,000.00
Biaya penyambungan Va 1,000,000.00 700.00 700,000,000.00
Biaya installatir termasuk Sertifikasi Laik Operasi Va 1,000,000.00 200.00 200,000,000.00

Penyambungan Daya pada listrik PLN 1,423,800,000.00

Penyambungan Listrik PLN 1400 KVA


Uang Jaminan Pelanggan Va 1,400,000.00 117.00 163,800,000.00
Biaya penyambungan Va 1,400,000.00 700.00 980,000,000.00
Biaya installatir termasuk Sertifikasi Laik Operasi Va 1,400,000.00 200.00 280,000,000.00

Penyambungan Daya pada listrik PLN 508,500,000.00

Penyambungan Listrik PLN 500 KVA


Uang Jaminan Pelanggan Va 500,000.00 117.00 58,500,000.00
Biaya penyambungan Va 500,000.00 700.00 350,000,000.00
Biaya installatir termasuk Sertifikasi Laik Operasi Va 500,000.00 200.00 100,000,000.00

Penyambungan Daya pada listrik PLN 355,950,000.00

Penyambungan Listrik PLN 350 KVA


Uang Jaminan Pelanggan Va 350,000.00 117.00 40,950,000.00
Biaya penyambungan Va 350,000.00 700.00 245,000,000.00
Biaya installatir termasuk Sertifikasi Laik Operasi Va 350,000.00 200.00 70,000,000.00

Pengadaan dan Pemasangan Instrumentasi dan Sistem Otomasi 3,916,000,000.00


Pengadaan dan Pemasangan Instrumentasi dan Sistem Otomasi SET 1.00 3,916,000,000.00 3,916,000,000.00

Pengadaan Kabel - Kabel (Kabel daya, Kabel dari PLN ke Panel TM, Primer Trafo, Sekunder Trafo, Gen 840,000,000.00

Pengadaan Kabel - Kabel (Kabel daya, Kabel dari PLN ke Panel TM, SET 1.00 840,000,000.00 840,000,000.00
Primer Trafo, Sekunder Trafo, Genset, dll)

Pematangan Lahan 250,000,000.00

Pematangan Lahan ls 1.00 250,000,000.00 250,000,000.00


HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6

PEKERJAAN IPA KAPASITAS 185 LT/DT


A PEKERJAAN PERSIAPAN DAN UMUM 1,000,000.00
I Persiapan dan Pekerjaan Sementara

Mobilisasi semua alat berat, mesin - mesin, peralatan dan tenaga ahli
1 1 Unit - -
yang diperlukan untuk pelaksanaan pekerjaan

Bangunan kantor kontraktor, workshop, gudang, tempat tinggal staf


dan tenaga kerja, serta fasilitas/bangunan lainnya termasuk furniture,
2 1 Unit - -
penerangan, AC dan tempat parkir yang diperlukan untuk pelaksanaan
pekerjaan.

3 Papan nama proyek 1 bh 1,000,000.00 1,000,000.00

4 Pengendalian lalu-lintas pada jalan umum, keamanan dan manajemen 1 Unit - -


lapangan

II Survey dan penyelidikan bawah tanah


1 Test pit ttk 10.00 - -
2 Penyediaan lokasi pembuangan hasil galian ls 1.00 - -

3 Pembersihan semua fasilitas sementara, Pemindahan mesin/peralatan, ls 1.00 - -


material sisa dan sebagainya
JUMLAH
1,000,000.00

B PEKERJAAN BANGUNAN SIPIL

- PEKERJAAN BANGUNAN IPA KAPASITAS 185 LT/DT #REF!


1 PEKERJAAN TANAH
1 Pengukuran dan Pasang Bowplank m' 132.70 - -
2 Galian Tanah dengan Excavator m3 40.06 - -
3 Urugan Tanah Kembali dengan Pemadatan m3 577.99 - -
4 Urugan Pasir m3 82.62 - -
Jumlah -

2 PEKERJAAN STRUKTUR ATAU SIPIL DAN ASITEKTUR


a Pekerjaan Pasangan dan Beton
1 Pekerjaan Pasangan Batu Kosong m3 4.45 - -
2 Pekerjaan Pasangan Batu Kali Campuran 1 : 4 m3 7.71 - -
3 Lantai Kerja K 125 m3 30.96 - -
4 Pekerjaan Beton Bor Pile
- Galian Tanah dengan Bor m' 200.00 #REF! #REF!
- Beton K 300 m3 25.13 - -
- Pembesian kg 3,746.18 - -
5 Pekerjaan Beton Pondasi Plat Kaki
- Beton K 300 m3 7.94 - -
- Pembesian kg 5,521.48 - -
- Begesting Batako m2 31.20 - -
6 Pekerjaan Beton Sloop
- Beton K 300 m3 6.18 - -
- Pembesian kg 848.18 - -
- Begesting 2x Pakai m2 41.20 - -
7 Pekerjaan Beton Standing Colum
- Beton K 300 m3 3.68 - -
- Pembesian kg 839.09 - -
- Begesting 2x Pakai m2 21.00 - -
8 Pekerjaan Beton Lantai
- Beton K 300 m3 287.93 - -
- Pembesian kg 55,829.00 - -
9 Pekerjaan Beton Dinding, Gutter, dan Plat Jalan Setapak
- Beton K 300 m3 839.30 - -
- Pembesian kg 100,032.99 - -
- Begesting 2x Pakai m2 4,883.65 - -
- Tie Rot m' 1,306.00 68,500.00 89,461,000.00
- Water Sttop W 300 mm m' 1,801.67 - -
10 Pekerjaan Beton Balok
- Beton K 300 m3 42.47 - -
- Pembesian kg 7,022.79 - -
- Begesting 2x Pakai m2 406.25 - -
11 Pekerjaan Beton Colum
- Beton K 300 m3 76.27 - -
- Pembesian kg 22,358.04 - -
- Begesting 2x Pakai m2 996.58 - -
12 Pekerjaan Beton Plat Atap
- Beton K 300 m3 55.76 - -
- Pembesian kg 10,895.18 - -
- Begesting 1x Pakai m2 361.57 - -
13 Pekerjaan Beton Plat Nozel
- Beton K 300 m3 14.51 - -
- Pembesian kg 3,861.37 - -
- Begesting 1x Pakai m2 96.72 - -
14 Pekerjaan Beton Tangga
- Beton K 300 m3 7.69 - -
- Pembesian kg 2,243.89 - -
- Begesting 1x Pakai m2 59.66 - -
- Begesting Batako m2 3.72 - -
15 Pekerjaan Beton Saluran
- Beton K 300 m3 75.94 - -
- Pembesian kg 6,969.96 - -
- Begesting 1x Pakai m2 669.06 - -
16 Pekerjaan Dudukan Pipa dan Pompa
- Beton K 300 m3 0.39 - -
- Pembesian kg 182.44 - -
- Begesting 2x Pakai m2 4.68 - -
17 Pekerjaan Pasangan Bata 1 : 4 m2 271.51 - -
18 Pekerjaan Plesteran m2 554.56 - -
19 Pek. Acian m2 1,158.07 - -
Jumlah #REF!
b Pekerjaan Rangka Baja dan Atap
1 Pekerjaan Rangka Atap Baja WF kg 8,447.39 - -
2 Pek. Rangka Atap Baja Ringan m2 119.70 190,000.00 22,743,000.00
3 Pekerjaan Gording Canal kg 2,332.84 - -
4 Pek. Sagrood Ø 12mm kg 18.00 - -
5 Pek. Track Stang Ø 12mm kg 58.83 - -
6 Pek. Plat Baja kg 114.11 - -
7 Pek. Baut Mur 16mm m2 352.00 - -
8 Pek. Baut Angker M22, L = 60 cm m' 176.00 - -
9 Pek. Atap Spandek 0.3mm m 273.81 Err:509 Err:509
10 Pek. Bubungan Spandek bh 30.30 Err:509 Err:509
11 Pek. Atap Genteng m2 127.15 - -
12 Pek. Bubungan Genteng m' 31.35 - -
13 Pekerjaan Pasang Lisplank m' 91.94 - -
14 Pek. Tatab m' 46.60 - -
15 Pek. Murda bh 2.00 - -
16 Pek. Ikut Celedu bh 4.00 - -
Jumlah Err:509

c Pekerjaan Kusen Pintu dan Jendela


1 Pekerjaan Kusen Pintu dan Jendela Aluminium m 76.320 - -
2 Pekerjaan Daun Pintu Aluminium m2 3.780 - -
3 Pekerjaan Daun Jendela Aluminium Panil Kaca m2 17.744 - -
4 Pekerjaan Kusen Pintu Besi Profil C NP m 7.00 - -
5 Pekerjaan Daun Pintu Besi rangka L 50.50.5 m2 3.99 - -
6 Pasang Engsel Pintu baja As 1" pasang 3.00 - -
7 Pasang Kunci Pintu Baja pasang 1.00 - -
8 Pasang Grendel Tanam untuk Pintu baja Set 2.00 - -
9 Pasang Engsel Pintu pasang 4.000 - -
10 Pasang Kunci Pintu pasang 2.000 - -
11 Pasang Grendel Pintu pasang 2.000 - -
12 Pasang Engsel Jendela pasang 48.000 - -
13 Pasang Grendel Jendela pasang 12.000 - -
14 Pasang Kait Angin pasang 24.000 - -
15 Pekerjaan Penutup Man Hole Plat Besi T=1,2 mm bh 2.00 Err:509 Err:509
16 Pekerjaan Grill Penutup Besi Strip 30x3 mm m2 30.40 1,087,936.03 33,073,255.16
17 Pekerjaan Railing m' 383.73 Err:509 Err:509
Jumlah Err:509
d Pekerjaan Finishing
1 Pekerjaan Pengecatan Dinding m2 306.875 - -
2 Pekerjaan Politur Lisplank m2 13.79 - -
3 Pekerjaan Pengecatan Rangka Baja m2 115.74 - -
4 Meni dan Cat Besi m2 7.98 - -
5 Ornamen Ukir Style Bali m2 15.24 3,129,740.63 47,697,247.13
6 Pekerjaan Waterproofing m2 3,913.61 - -
7 Pekerjaan Pasangan Keramik Lantai m2 53.71 - -
8 Pekerjaan Lapis Keramik pada Gutter m2 221.79 - -
Jumlah 47,697,247.13

- PEKERJAAN BANGUNAN PENGELOLA Err:509


1 PEKERJAAN TANAH
1 Galian Tanah dengan excavator m3 43.66 - -
2 Pengukuran dan Bouwplank m' 327.44 - -
3 Urugan Tanah Kembali dengan Pemadatan m3 191.54 - -
4 Urugan Pasir t = 10 cm m3 15.64 - -
Jumlah -
2 PEKERJAAN STRUKTUR ATAU SIPIL DAN ASITEKTUR
a Pekerjaan Beton
1 Pekerjaan Beton Rabat K125 m3 4.73 - -
2 Pekerjaan Beton Pondasi Plat Kaki R. Pengelola
- Beton Cor K-225 m3 8.06 - -
- Pekerjaan Besi Beton Kg 1,033.02 - -
- Pekerjaan Begesting 2 X pakai m2 26.88 - -
3 Beton Kolom Lt 1 R. Pengelola
- Beton Cor K-225 m3 8.62 - -
- Pekerjaan Besi Beton Kg 1,822.37 - -
- Pekerjaan Begesting 2 X pakai m2 114.91 - -
4 Balok Sloof ( S1 dan SP ) R. Pengelola
- Beton Cor K-225 m3 6.21 - -
- Pekerjaan Besi Beton Kg 1,693.73 - -
- Pekerjaan Begesting 2 X pakai m2 50.76 - -
5 Balok Lantai 1 ( B1 & TP ) R.Pengelola
- Beton Cor K-225 m3 6.36 - -
- Pekerjaan Besi Beton Kg 2,057.17 - -
- Pekerjaan Begesting 2 X pakai m2 76.67 - -
6 Beton Balok Lt.2 R. Pengelola
- Beton Cor K-225 m3 5.63 - -
- Pekerjaan Besi Beton Kg 1,153.03 - -
- Pekerjaan Begesting 2 X pakai m2 59.67 - -
7 Beton Plat Lantai 2 R. Pengelola
- Beton Cor K-225 m3 12.00 - -
- Pekerjaan Besi Beton Kg 1,542.18 - -
- Pekerjaan Begesting 2 X pakai m2 100.00 - -
8 Beton Plat Lantai 2 R. Pengelola ( T10-01)
- Beton Cor K-225 m3 6.31 - -
- Pekerjaan Besi Beton Kg 606.63 - -
- Pekerjaan Begesting 2 X pakai m2 91.08 - -
9 Beton Tangga R. Pengelola
- Beton Cor K-225 m3 2.63 - -
- Pekerjaan Besi Beton Kg 762.98 - -
- Pekerjaan Begesting 2 X pakai m2 20.78 - -
10 Beton Kolom Lt 2 R. Pengelola
- Beton Cor K-225 m3 6.44 - -
- Pekerjaan Besi Beton Kg 1,367.89 - -
- Pekerjaan Begesting 2 X pakai m2 85.85 - -
11 Beton Ring Balok R. Pengelola
- Beton Cor K-225 m3 2.89 - -
- Pekerjaan Besi Beton Kg 642.62 - -
- Pekerjaan Begesting 2 X pakai m2 31.35 - -
12 Beton Kolom Praktis R. Pengelola
- Beton Cor K-225 m3 0.81 - -
- Pekerjaan Besi Beton Kg 267.29 - -
- Pekerjaan Begesting 2 X pakai m2 21.56 - -
13 Beton Ring Balok Praktis
- Beton Cor K-225 m3 4.32 - -
- Pekerjaan Besi Beton Kg 215.80 - -
- Pekerjaan Begesting 2 X pakai m2 19.80 - -
Jumlah -

b Pekerjaan Pasangan dan Dinding


1 Pekerjaan Dinding Pasangan Bata 1:4 m2 272.67 - -
2 Pekerjaan Dinding Pasangan Bata 1:2 m2 39.10 - -
3 Pekerjaan Plesteran 1:4 m2 545.34 - -
4 Pekerjaan Plesteran 1:2 m2 78.20 - -
5 Pekerjaan Acian Dinding m2 623.54 - -
6 Pekerjaan Pas. Keramik Lantai 40 x 40 m2 157.56 - -
7 Pekerjaan lantai keramik stepnozing m1 24.50 - -
8 Pek. Pasangan Batu Paras Sangsit m2 105.40 - -
9 Ornamen ukir style bali m2 13.93 - -
10 Pekerjaan Pasangan Batu Kosong m3 14.04 - -
11 Pekerjaan Pondasi Batu Kali m3 45.59 - -
12 Pekerjaan Pas. Keramik dinding 20 x 60 m2 33.13 - -
13 Pek. Pas Keramik Lantai 30 x 30 Cm m2 6.56 - -
14 Pekerjaan Pas. Keramik plin 10 x 40 m1 110.46 - -
15 Pekerjaan Pasangan Pepalihan Style Bali m2 219.86 - -
Jumlah -

c Pekerjaan Kusen, Pintu dan Jendela


1 Pekerjaan Kusen Pintu dan Jendela Aluminium m 203.00 - -
2 Pekerjaan Kusen Pintu Kayu Kamfer m³ 5.65 - -
3 Talang air hujan m 17.18 - -
4 Daun Pintu bingkai Allumunium m2 14.81 - -
5 Daun Pintu Kamfer m2 2.57 - -
6 Jendela Kaca Bingkai Alumunium m2 42.04 - -
7 Pasang Engsel Pintu pasang 20.00 - -
8 Pasang Engsel Jendela pasang 32.00 - -
9 Pasang Kunci Pintu pasang 8.00 - -
10 Pasang Grendel Jendela pasang 32.00 - -
11 Pasang Kait Angin pasang 32.00 - -
Jumlah -

d Pekerjaan Atap dan Plafond


1 Pekerjaan Kap Baja Ringan m2 80.30 175,000.00 14,052,937.50
2 Pasang Atap Genteng Keramik glasur m2 152.49 - -
3 Pasang Genteng Bubungan Keramik glasur m 45.81 - -
4 Pek. Pasang Listplank Kayu kanfer Profil m 72.80 - -
5 Murda Paras Ukir unit 3.00 - -
6 Ikut Celedu Paras Ukir unit 8.00 - -
7 Pekerjaan Plafond Gypsum Rangka Hollow m2 135.38 - -
8 Pekerjaan list Plafond m 152.78 - -
9 Pekerjaan Railing Tangga dan Balkon (Stainless Steel) m 8.87 Err:509 Err:509
10 Pek. Lambesering m2 72.21 - -
11 Pek. List Plafond Lambesering m 67.12 - -
Jumlah Err:509

e Pekerjaan Finishing
1 Pekerjaan Pengecatan Dinding Luar m2 201.79 - -
2 Pekerjaan Pengecatan Dinding Dalam m2 478.79 - -
3 Pekerjaan Pengecatan Plafond m2 135.38 - -
4 Pekerjaan Polituran Listplank m2 73.33 - -
5 Pekerjaan Pengecatan Rangka Baja m2 343.60 - -
6 Pekerjaan Polituran Lambesering m2 72.21 - -
Jumlah -
f Pekerjaan Toilet
1 Instalasi Plumbing Air Bersih m 25.00 42,900.00 1,072,500.00
2 Instalasi Plumbing Air Kotor m 36.00 231,170.50 8,322,138.00
3 Closet duduk bh 2.00 - -
4 Pasang Washtafel set 2.00 - -
5 Pasang Floor Drain set 2.00 - -
6 Pasang Kran air set 4.00 - -
Jumlah 9,394,638.00

- PEKERJAAN BANGUNAN KIMIA DAN CHLORINE 60,389,226.87


1 PEKERJAAN TANAH
1 Pengukuran dan Pasang Bowplank m' 66.20 - -
2 Galian Tanah dengan Excavator m3 91.79 - -
3 Urugan Tanah Kembali dengan Pemadatan m3 27.59 - -
4 Urugan Pasir m3 11.65 - -
Jumlah -

2 PEKERJAAN STRUKTUR ATAU SIPIL DAN ASITEKTUR


a Pekerjaan Beton
1 Lantai Kerja K 125 ( 1 pc : 3 ps : 5 Kr) m3 7.40 - -
2 Pondasi Beton Plat Kaki
- Beton K 300 m3 4.95 - -
- Pembesian kg 781.16 - -
- Begesting Batako m2 19.80 - -
3 Balok Dasar Sloof
- Beton K 300 m3 6.42 - -
- Pembesian kg 926.15 - -
- Begesting 2x Pakai m2 64.16 - -
4 Beton Kolom
- Beton K 300 m3 12.05 - -
- Pembesian kg 2,449.06 - -
- Begesting 2x Pakai m2 163.03 - -
5 Beton Balok
- Beton K 300 m3 16.52 - -
- Pembesian kg 3,246.20 - -
- Begesting 2x Pakai m2 177.67 - -
6 Plat Lantai
- Beton K 300 m3 7.25 - -
- Pembesian kg 1,225.38 - -
7 Plat Atap
- Beton K 300 m3 12.22 - -
- Pembesian kg 2,617.31 - -
- Begesting 1x Pakai m2 101.82 - -
8 Beton Dudukan Tabung dan Bak Pencampur
- Beton K 300 m3 4.42 - -
- Pembesian kg 804.74 - -
- Begesting 2x Pakai m2 56.51 - -
9 Beton Lisplank
- Beton K 300 m3 2.26 - -
- Pembesian kg 970.54 - -
- Begesting 2x Pakai m2 73.46 - -
Jumlah -

b Pekerjaan Pasangan dan Pelapis


1 Pekerjaan Pasangan Batu Kosong m3 16.98 - -
2 Pekerjaan Pasangan Batu Kali 1:4 m3 28.65 - -
3 Pekerjaan PasanganDinding Bata 1:2 m2 435.61 - -
4 Pekerjaan Plesteran Dinding 1:2 m2 37.35 - -
5 Pekerjaan Plesteran Dinding 1 PC : 5 Ps m2 833.88 - -
6 Pekerjaan Acian Dinding m2 833.88 - -
7 Pekerjaan Pasangan Keramik Lantai 40 x 40 cm m2 833.88 - -
8 Pek. Pasangan Batu Paras Sangsit m2 40.53 - -
9 Pekerjaan Lapisan Fiber Glass (2 x Lapis) m2 39.51 507,788.60 20,064,555.62
10 Pekerjaan Plafond Gypsum Rangka Hollow m2 206.66 - -
11 Pekerjaan list Plafond m 78.46 - -
12 Pekerjaan Pas. Keramik lantai 30 x 30 m2 70.45 - -
13 Pas. Keramik 20x30 cm m2 4.30 - -
14 Pek. Pasangan Keramik Dinding KM 20 x 25 Cm m2 17.43 - -
15 Pas. Stepnozing m' 8.30 - -
16 Pekerjaan Toilet
- Instalasi Plumbing Air Bersih m 20.00 42,900.00 858,000.00
- Instalasi Plumbing Air Kotor m 15.00 231,170.50 3,467,557.50
- Pasang Closet Duduk bh 1.00 - -
- Pasang Washtafel set 1.00 - -
- Pasang Floor Drain set 1.00 - -
- Pasang Kran air set 1.00 - -
- Pekerjaan Septick Tank dan peresapan unit 1.00 - -
- Pompa Air Bersih unit 1.00 3,850,000.00 3,850,000.00
Jumlah 28,240,113.12
c Pekerjaan Atap
1 Pekerjaan Atap Baja Ringan m2 167.96 190,000.00 31,912,400.00
2 Pekerjaan Pasangan Atap Genteng m2 115.60 - -
3 Pekerjaan Pas Bubungan m' 42.29 - -
4 Pekerjaan Pas. Ikut Celedu unit 4.00 - -
5 Pekerjaan Pas. Murda unit 2.00 - -
6 Pekerjaan Pas. Listplank m' 125.92 - -
7 Pekerjaan Pas. Tatab m' 63.40 - -
8 Pek. Cat Listplank m2 31.48 - -
Jumlah 31,912,400.00
d Pekerjaan Kusen, Pintu, Jendela dan Relling
1 Pekerjaan Kusen Pintu dan Jendela Aluminium m 20.480 - -
2 Pekerjaan Daun Pintu Aluminium m2 3.21 - -
3 Pekerjaan Daun Jendela Aluminium Panil Kaca m2 2.45 - -
4 Pekerjaan Kusen Kayu m3 0.02 - -
5 Pekerjaan Daun Jendela Jalusi m2 0.35 676,325.00 236,713.75
6 Pekerjaan Kusen Pintu Besi Profil C NP m 26.10 - -
7 Pekerjaan Daun Pintu Besi rangka L 50.50.5 m2 34.32 - -
8 Pasang Engsel Pintu pasang 2.00 - -
9 Pasang Engsel Jendela pasang 8.00 - -
10 Pasang Handle dan Kunci Pintu pasang 1.00 - -
11 Pasang Grendel Jendela pasang 4.00 - -
12 Pasang Kait Angin pasang 8.00 - -
13 Pasang Engsel Pintu baja As 1" pasang 12.00 - -
14 Pasang Kunci Pintu Baja pasang 2.00 - -
15 Pasang Grendel Tanam untuk Pintu baja Set 4.00 - -
Jumlah 236,713.75

e Pekerjaan Cat
1 Meni dan Cat Besi m2 68.64 - -
2 Plamur dan Cat Tembok m2 833.88 - -
3 Pekerjaan Pengecatan Plafond m2 206.66 - -
Jumlah -

- PEKERJAAN BANGUNAN GENSET Err:509


1 PEKERJAAN TANAH
1 Pengukuran dan Pasang Bowplank m' 50.65 - -
2 Galian Tanah dengan excavator m3 354.93 - -
3 Urugan Tanah Kembali dengan Pemadatan m3 224.44 - -
4 Urugan Pasir di bawah lantai m3 13.93 - -
5 Urugan Pasir di bawah Pondasi t = 10 cm m3 38.00 - -
Jumlah -

2 PEKERJAAN STRUKTUR ATAU SIPIL DAN ASITEKTUR


a Pekerjaan Pasangan dan Beton
1 Pekerjaan Pasangan Batu Kosong m3 8.40 - -
2 Pekerjaan Pasangan Pondasi Batu Kali m3 42.10 - -
3 Pekerjaan Beton Rabat
- Cor Beton K125 m3 7.01 - -
4 Pekerjaan Beton pondasi Plat kaki
- Beton Cor K-225 m3 5.83 - -
- besi Beton Kg 2,974.19 - -
- Begesting Pasangan Batako 1:5 m2 15.36 - -
5 Pekerjaan Beton Sloope
- Beton Cor K-225 m3 5.04 - -
- besi Beton Kg 1,126.08 - -
- Begesting 2 X pakai m2 33.60 - -
6 Pekerjaan Beton Kolom
- Beton Cor K-225 m3 8.33 - -
- besi Beton Kg 2,121.56 - -
- Begesting 2 X pakai m2 105.18 - -
7 Pekerjaan Beton Lantai Dan Pondasi Genset
- Beton Cor K-300 m3 16.49 - -
- besi Beton Kg 270.78 - -
8 Pekerjaan Beton Balok Atap
- Beton Cor K-225 m3 11.42 - -
- besi Beton Kg 1,964.15 - -
- Begesting 2 X pakai m2 80.86 - -
9 Pekerjaan Beton Plat Atap
- Beton Cor K-225 m3 15.01 - -
- besi Beton Kg 2,016.08 - -
- Begesting 1 X pakai m2 124.82 - -
10 Pekerjaan Beton Listplank
- Beton Cor K-225 m3 3.10 - -
- besi Beton Kg 698.79 - -
- Begesting 2 X pakai m2 50.09 - -
11 Kolom Praktis dan Balok Latei
- Beton Cor K-225 m3 1.07 - -
- besi Beton Kg 224.43 - -
- Begesting 2 X pakai m2 21.38 - -
12 Pekerjaan Pasangan Dinding Bata 1 Pc : 4 Ps m3 197.50 - -
13 Pekerjaan Plesteran Dinding 1 Pc : 4 Ps m3 298.12 - -
14 Pekerjaan Acian Dinding m3 474.25 - -
15 Pekerjaan Water Proofing ( Atap ) m2 161.84 - -
16 Pekerjaan Beton Sloope, Ring Balk & Kolom Praktis m3 0.90 - -
17 Pekerjaan Pas. Keramik Lantai 30 x 30 m2 21.43 - -
Jumlah -

b Pekerjaan Kusen Pintu dan Jendela


1 Pekerjaan Kusen Pintu dan Jendela Aluminium m 21.16 - -
2 Pekerjaan Daun Jendela Jalusi m2 10.37 Err:509 Err:509
3 Pekerjaan Kusen Pintu Besi Profil C NP 140 x 60 x 7 mm m 29.63 - -
4 Pekerjaan Pintu Plat baja 2 sisi dalamnya Glass wool m2 13.68 - -
5 Pasang Engsel Pintu baja As 1" pasang 18.00 - -
6 Pasang Kunci Pintu Baja pasang 4.00 - -
7 Pasang Grendel Tanam untuk Pintu baja Set 4.00 - -
8 Talang Air Hujan m' 20.80 - -
9 Baut Angkur M22 Penjangkaran 1000 mm bh 10.00 - -
Jumlah Err:509

c Pekerjaan Finishing
1 Pekerjaan Pengecatan Dinding (Plamuur dan Cat Tembok) m2 437.28 - -
2 Pek. Pasangan Bata Paras Sangsit m2 25.90 - -
3 Pekerjaan Pasangan Pepalihan Style Bali (Batu Paras Sangsit) m2 90.12 - -
Jumlah -

- PEKERJAAN BANGUNAN IPAL Err:509


1 PEKERJAAN TANAH
1 Pengukuran dan Pasang Bowplank m' 83.20 - -
2 Galian Tanah dengan Excavator m3 171.55 - -
3 Urugan Pasir m3 282.10 - -
4 Kerikil Halus gradasi butiran Ø 0.3 - 1.75 Cm m3 44.32 220,327.80 9,765,478.92
5 Pasir Halus gradasi butiran Ø 0.4 - 0.7 mm m3 46.80 193,004.90 9,032,629.32
Jumlah 18,798,108.24

2 PEKERJAAN STRUKTUR ATAU SIPIL DAN ASITEKTUR


a Pekerjaan Beton
1 Lantai Kerja K 125 ( 1 pc : 3 ps : 5 Kr) m3 11.46 - -
2 Beton Plat Lantai
- Beton K 300 m3 65.09 - -
- Pembesian kg 7,777.05 - -
- Begesting 2x Pakai m2 27.49 - -
3 Pekerjaan Beton Dinding dan Saluran
- Beton K 300 m3 68.16 - -
- Pembesian kg 10,278.07 - -
- Begesting 2x Pakai m2 500.43 - -
Jumlah -
b PEKERJAAN LAIN LAIN
1 Pekerjaan Baja Profil I WF 250 X 125 X 5 mm Kg 807.47 - -
2 Pekerjaan Baja Profil I NP 60 Kg 177.24 - -
3 Pekerjaan Besi Plat Tebal 5 cm Kg 577.76 - -
4 Pekerjaan Grill Penutup Besi strip 30 x 3 mm m2 14.03 1,087,936.03 15,263,742.43
5 Pekerjaan Pintu Air Unit 5.00 271,984.01 1,359,920.05
6 Pekerjaan Pintu Air dari kayu ulin / besi lubang 400 x 300 mm unit 4.00 15,334,000.00 61,336,000.00
7 Pekerjaan waterproofing m2 288.66 - -
8 Baut Angkur M22 Penjangkaran 1000 mm bh 24.00 - -
9 Plat Andas 300 x 300 x 18 mm bh 6.00 Err:509 Err:509
10 Meni dan Cat Besi m2 41.58 - -
Jumlah Err:509

- PEKERJAAN SIPIL RESERVOIR KAPASITAS 3600 M3 #REF!


1 PEKERJAAN TANAH
1 Pengukuran dan Pasang Bowplank m' 160.72 - -
2 Galian Tanah dengan excavator m3 1,527.30 - -
3 Urugan Tanah Kembali dengan Pemadatan m3 163.39 - -
4 Urugan Pasir t = 10 cm m3 100.66 - -
Jumlah -
2 PEKERJAAN STRUKTUR ATAU SIPIL DAN ASITEKTUR
a Pekerjaan Beton
1 Pekerjaan Pondasi Bor Pile
- Pembuatan lubang Bor Pile Ø 40 cm m 420.00 #REF! #REF!
- Beton Cor K-300 m3 52.75 - -
- besi Beton Kg 9,243.18 - -
2 Lantai Kerja K - 125 (1 PC : 3 PS : 5KR)
- Cor Beton Camp 1:3:5 m3 50.33 - -
3 Pekerjaan Beton pondasi Plat Setempat & Keliling
- Beton Cor K-300 m3 105.41 - -
- besi Beton Kg 39,177.49 - -
- Begesting Pasangan Batako m2 230.24 - -
4 Pekerjaan Sloof
- Beton Cor K-300 m3 46.98 - -
- Pekerjaan Besi Beton Kg 15,145.60 - -
- Begesting Pasangan Batako m2 313.20 - -
5 Pekerjaan Beton Lantai
- Beton Cor K-300 m3 247.14 - -
- besi Beton Kg 41,030.07 - -
6 Pekerjaan Beton Kolom
- Beton Cor K-300 m3 68.85 - -
- besi Beton Kg 15,896.45 - -
- Begesting 2 X pakai m2 635.06 - -
7 Pekerjaan Beton Dinding Basement
- Beton Cor K-300 m3 320.38 - -
- besi Beton Kg 34,908.46 - -
- Begesting 2 X pakai m2 2,135.88 - -
- Pekerjaan Tie Rod pada Bekisting Vertikal m1 1,669.60 68,500.00 114,367,600.00
8 Pekerjaan Beton Balok
- Beton Cor K-300 m3 68.99 - -
- besi Beton Kg 13,276.15 - -
- Begesting 2 X pakai m2 588.56 - -
9 Pekerjaan Beton Plat Atap
- Beton Cor K-300 m3 95.70 - -
- besi Beton Kg 18,810.82 - -
- Begesting 1 X pakai m2 793.73 - -
10 Pekerjaan Beton Listplang
- Beton Cor K-300 m3 8.44 - -
- besi Beton Kg 1,014.72 - -
- Begesting 2 X pakai m2 185.77 - -
11 Pekerjaan Tangga
- Beton Cor K-300 m3 3.31 - -
- besi Beton Kg 854.28 - -
- Begesting 2 X pakai m2 15.40 - -
12 Pekerjaan Dudukan Pompa dan Pipa
- Beton Cor K-300 m3 0.23 - -
- besi Beton Kg 255.93 - -
- Begesting 2 X pakai m2 6.96 - -
Jumlah #REF!
b Pekerjaan Pasangan dan Pelapis
1 Pekerjaan PasanganPondasi Batu Kali m3 2.20 - -
2 Pekerjaan Pas, Dinding Bata Merah 1 : 2 m2 559.44 - -
3 Pekerjaan Pas, Dinding Bata Merah 1 : 4 m2 55.92 - -
4 Pekerjaan Pas. Batako m2 402.90 - -
5 Pekerjaan Water Proofing m2 3,901.92 - -
6 Pekerjaan Water Stop m 960.05 - -
7 Pekerjaan Plesteran 1 PC : 2 Ps m2 1,118.88 - -
8 Pekerjaan Plesteran 1 PC : 4 Ps m2 142.20 - -
9 Pekerjaan Acian m2 371.10 - -
10 Pek. Pasangan Bata Paras Sangsit m2 32.87 - -
11 Meni dan cat besi m2 11.51 - -
Jumlah -

c Pekerjaan Kusen Pintu dan Relling


1 Pekerjaan Kusen Aluminium m' 27.50 - -
2 Pekerjaan Daun Pintu Panil m2 1.94 - -
3 Pekerjaan Jendela Jelusi m2 1.73 - -
4 Pas. Engsel Pintu bh 2.00 - -
5 Pasang Handle + Kunci Pintu bh 1.00 - -
6 Pekerjaan Kusen Pintu Baja Profil L 70.70.6 m2 11.20 - -
7 Pekerjaan Daun Pintu Besi rangka L 50.50.5 m2 11.51 - -
8 Pasang Engsel Pintu baja As 1" pasang 3.00 235,361.50 706,084.50
9 Pasang Kunci Pintu Baja set 1.00 225,000.00 225,000.00
10 Pasang Grendel Tanam untuk Pintu baja pasang 2.00 138,527.50 277,055.00
11 Pekerjaan Pipa Ventilasi GIP 4" Unit 7.00 750,000.00 5,250,000.00
12 Pekerjaan Penutup Man Hole Plat Besi T= 1.2 mm Unit 7.00 Err:509 Err:509
13 Pekerjaan Tangga Inspeksi Pipa GIP Unit 7.00 Err:509 Err:509
14 Railling Balkon dan Tangga (Pipa Black Steel) m' 31.68 Err:509 Err:509
Jumlah Err:509

- PEKERJAAN SIPIL BANGUNAN POS JAGA 16,468,338.00


1 Pekerjaan Tanah
1 Pengukuran dan Pasang Bowplank m' 36.80 - -
2 Galian Tanah dengan excavator m3 12.78 - -
3 Urugan Tanah Kembali dengan Pemadatan m3 7.99 - -
4 Urugan Pasir t = 10 cm m3 1.01 - -
1 Pek. Urugan Tanah Peninggian Lantai m3 5.77 - -
2 Pek. Urugan Pasir Lantai Kerja m3 1.07 - -
Jumlah -
2 PEKERJAAN STRUKTUR ATAU SIPIL DAN ASITEKTUR
3 PEKERJAAN BETON
1 Lantai Kerja K - 125
- Cor Beton K-125 m3 1.07 - -
2 Pekerjaan Sloof
- Beton Cor K-175 m3 1.69 - -
- Pekerjaan Besi Beton Kg 191.57 - -
- Begesting Pasangan Batako m2 16.90 - -
3 Pekerjaan Beton Kolom
- Beton Cor K-175 m3 0.92 - -
- besi Beton Kg 192.07 - -
- Begesting 2 X pakai m2 24.52 - -
4 Pekerjaan Beton Balok
- Beton Cor K-175 m3 1.17 - -
- besi Beton Kg 191.05 - -
- Begesting 2 X pakai m2 21.72 - -
5 Pekerjaan Meja Beton
- Beton Cor K-175 m3 0.10 - -
- besi Beton Kg 25.69 - -
- Begesting 2 X pakai m2 1.95 - -
Jumlah -
4 PEKERJAAN PASANGAN DAN PELAPIS
1 Pekerjaan Pasangan Batu Kosong m3 3.04 - -
2 Pekerjaan Pasangan Batu Kali Camp 1 : 5 m3 9.13 - -
3 Pekerjaan Pasangan Bata Camp 1:5 m2 123.80 - -
4 Pekerjaan Trasram m2 13.68 - -
5 Pekerjaan Plesteran 1 PC : 5 PS m2 247.59 - -
6 Pekerjaan Acian m2 247.59 - -
7 Pekerjaan Cat Dinding m2 247.59 - -
8 Pek. Pasangan Paras Sangsit m2 11.37 - -
Jumlah -

5 PEKERJAAN ATAP
1 Pekerjaan Rangka Kuda-Kuda Baja Ringan m3 37.23 190,000.00 7,073,700.00
2 Pekerjaan Pasangan Atap Genteng m2 33.66 - -
3 Pekerjaan Pas Bubungan m' 20.56 - -
4 Pekerjaan Pas. Ikut Celedu unit 4.00 - -
5 Pekerjaan Pas. Murda unit 2.00 - -
6 Pekerjaan Pas. Listplank m' 25.53 - -
7 Pekerjaan Pas. Tatab m' 26.13 - -
8 Pek. Cat Listplank m2 12.77 - -
Jumlah 7,073,700.00
6 PEKERJAAN LANGIT-LANGIT
1 Pas. Plafond Kasiboard Rangka Hollow m3 37.60 - -
2 Pas. List Gypsum m' 85.85 - -
3 Pek. Cat Plafond m2 37.60 - -
Jumlah -
7 PEKERJAAN PENUTUP LANTAI
1 Pas.Keramik 30 x 30 cm m2 36.91 - -
2 Pas. Keramik 20x30 cm m2 2.25 - -
3 Pas. Keramik Dinding m2 12.60 - -
4 Pas. Stepnozing m' 6.00 - -
Jumlah -
8 PEKERJAAN KUSEN PINTU & JENDELA
1 Pas. Kusen Kayu Kamper m3 0.24 - -
2 Pas. Daun Pintu Kayu Kamper m2 3.46 - -
3 Pas. Jendela Kaca m2 1.76 - -
4 Pas. Kaca Bening t = 5 mm m2 0.78 - -
5 Pas. Engsel Pintu set 4.00 - -
6 Pas. Grendel Pintu unit 2.00 - -
7 Pas. Handle & Kunci Pintu m' 2.00 - -
8 Pas. Engsel Jendela unit 8.00 - -
9 Pas. Grendel Jendela unit 4.00 - -
10 Pas. Kait Angin unit 8.00 - -
Pek. Polituran m2 19.24 - -
Jumlah -
g Pekerjaan Toilet
1 Instalasi Plumbing Air Bersih m 25.00 42,900.00 1,072,500.00
2 Instalasi Plumbing Air Kotor m 36.00 231,170.50 8,322,138.00
3 Closet duduk bh 1.00 - -
4 Pasang Washtafel set 1.00 - -
5 Pasang Floor Drain set 1.00 - -
6 Pasang Kran air set 2.00 - -
7 Pekerjaan Septiktank unit 1.00 - -
8 Pekerjaan Peresapan unit 1.00 - -
Jumlah 9,394,638.00

C BANGUNAN ADAT PURA 571,822,156.82

1 Pekerjaan Tanah
1 Pengukuran dan Pasang Bowplank m' 63.46 - -
1 Urugan Tanah Biasa dipadatkan m3 384.68 - -
1 Urugan Pasir di bawah Pondasi t = 10 cm m3 4.04 - -
Jumlah -

2 Pekerjaan Padmasana & Pelinggih Lain


1 Pek. Padmasana (Batu Tabas Karangasem) set 1.00 92,950,000.00 92,950,000.00
2 Pek. Pasangan Paving Stone/Block m2 160.24 - -
3 Pekerjaan Tugu Pelinggih Wisnu Ls 1.00 22,000,000.00 22,000,000.00
4 Pekerjaan Tugu Penunggun Karang Ls 1.00 22,000,000.00 22,000,000.00
5 Pekerjaan Penyengker
- Pek. Pasangan Batu Kali 1 : 5 m3 29.20 - -
- Pek. Candi Bentar unit 2.00 - -
- Pek. Paduraksa unit 9.00 - -
- Pek. Tembok Penyengker m' 27.76 - -
- Pek. Beton Sloof, Kolom, dan Balok K175 m3 2.05 - -
- Pek. Begesting Sloof 2x Pakai m2 12.76 - -
- Pek. Begesting Kolom 2x Pakai m2 3.69 - -
- Pek. Begesting Balok 2x Pakai m2 17.50 - -
- Pek. Pembesian kg 409.10 - -
- Pek. Pengeresek m3 2.02 - -
- Pek. Pasangan Bata Camp. 1 : 5 m2 24.98 - -
6 Pekerjaan Piyasan Ls 1.00 50,765,000.00 50,765,000.00
7 Pekerjaan Penunggun Karang (Belakang) Unit 1.00 19,250,000.00 19,250,000.00
8 Railling Balkon dan Tangga (Pipa Black Steel) m 23.46 15,552,308.48 364,857,156.82
Jumlah 571,822,156.82

D PEKERJAAN HALAMAN/LANSCAPE 395,826,377.47

Pekerjaan Halaman/Lanscape
1 Pengukuran dan Pasang Bowplank m' 389.03 - -
2 Galian Tanah dengan excavator m3 1,139.62 - -
3 Pek. Urugan Tanah Kembali m3 1,139.62 - -
4 Pek. Urugan Tanah Dipadatkan m3 3,774.91 - -
5 Pek. Urugan Pasir m3 18.59 - -
6 Pek. Beton K 125 m3 18.59 - -
7 Pasangan Paving Block t = 8 cm m2 1,992.84 - -
8 Pas. Saluran Uditch 50x50 x120 mm m' 112.38 - -
9 Pas Grill Saluran m2 112.38 1,500,000.00 168,570,000.00
10 Pas. Gasebo Unit 1.00 79,750,000.00 79,750,000.00
11 Pas. Kansteen m' 267.57 - -
12 Penanaman Pohon Jepun Bali pohon 22.00 1,796,733.92 39,528,146.15
13 Penanaman Pohon Palem Putri pohon 28.00 1,250,000.00 35,000,000.00
14 Penanaman Pohon Lontar pohon 7.00 725,000.00 5,075,000.00
15 Penananaman Pohon Kelapa Gading pohon 8.00 254,203.92 2,033,631.33
16 Penanaman Pucuk Merah pohon 95.00 45,000.00 4,275,000.00
17 Penanaman Pohon Soka Bangkok pohon 550.00 15,500.00 8,525,000.00
18 Penanaman Pohon Bakung Putih pohon 440.00 18,500.00 8,140,000.00
19 Penanaman Pohon Kana pohon 500.00 25,000.00 12,500,000.00
20 Penanaman Rumput m2 810.74 40,000.00 32,429,600.00
Jumlah 395,826,377.47
E PEKERJAAN PAGAR Err:509

Pekerjaan Pagar
1 Pengukuran dan Pasang Bowplank m' 389.03 - -
2 Galian Tanah dengan excavator m3 507.86 - -
3 Pekerjaan DPT Pasangan Batu Kali 1 PC : 4 PS m3 1,177.02 - -
4 Pekerjaan Beton Penguat DPT K-225 m3 98.32 - -
5 Pekerjaan Begesting Sloof 2x Pakai m2 89.06 - -
6 Pekerjaan Begesting Kolom 2x Pakai m2 340.24 - -
7 Pekerjaan Begesting Balok 2x Pakai m2 178.11 - -
8 Pekerjaan Pembesian kg 25,580.15 - -
9 Pekerjaan Beton Sloope, Ring Balk & Kolom Praktis m3 22.73 - -
10 Pekerjaan Pasangan Bata Merah 1 Pc : 5 Ps m2 233.82 - -
11 Pekerjaan Plesteran Tembok 1 PC : 4 PS m2 467.63 - -
12 Pekerjaan Relling Pipa Galvanis m' 197.73 Err:509 Err:509
13 Pekerjaan Pagar Style Bali M1 295.97 - -
14 Pek. Paduraksa Style Bali bh 99.00 - -
15 Pek. Gapura Style Bali Ls 1.00 356,469,181.89 356,469,181.89
16 Sign Board Style Bali Ls 1.00 93,356,477.20 93,356,477.20
Jumlah Err:509

F PEKERJAAN JALAN AKSES Err:509


1 Pengukuran dan Pasang Bowplank m' 161.92 - -
2 Galian Tanah dengan excavator m3 157.68 - -
5 Pekerjaan Urugan Tanah Kembali Dipadatkan m3 1,829.48 - -
6 Pekerjaan Urugan Pasir m3 8.22 - -
7 Pekerjaan Beton K125 m3 4.11 - -
8 Pekerjaan Beton Box Control K 225 m3 25.50 - -
9 Pekerjaan Begesting 2x Pakai m2 49.00 - -
10 Pekerjaan Pembesian kg 2,788.75 - -
11 Pekerjaan DPT Pasangan Batu Kali 1 PC : 4 PS m3 447.71 - -
12 Pekerjaan Urugan Agregat A m3 472.16 - -
13 Pekerjaan Urugan Agregat B m3 700.95 - -
14 Lapis Resap Pengikat - Aspal Cair liter 3,504.76 Err:509 Err:509
15 Lapis Perekat - Aspal Cair liter 1,635.55 Err:509 Err:509
16 Laston Lapis Aus (AC-WC) (gradasi halus/kasar) ton 134.87 Err:509 Err:509
17 Laston Lapis Antara (AC-BC) (gradasi halus/kasar) ton 205.21 Err:509 Err:509
18 Aspal Minyak ton 30.64 Err:509 Err:509
19 Bahan Pengisi (Filler) Tambahan liter 10.42 - -
20 Pekerjaan Box Culvert 3x2x1.2 m bh 11.00 Err:509 Err:509
21 Pekerjaan Kansteen m' 647.68 - -
Jumlah Err:509

G PEKERJAAN SALURAN DRAINASE PEMBUANG -


1 Galian Tanah dengan excavator m3 4,092.00 - -
2 Pas. Batu Kali 1 : 5 m3 2,790.00 - -
3 Pek. Siaran m2 5,890.00 - -
4 Pek. Plesteran 1 : 5 m2 2,325.00 - -
Jumlah -

H PEKERJAAN MEKANIKAL DAN ELEKTRIKAL


- PEKERJAAN MEKANIKAL DAN ELEKTRIKAL BANGUNAN IPA KAPSITAS 185 L/DTK 11,201,647,930.18
a Pengadaan dan Pemasangan Mekanikal dan Aksesoris
1 Perpipaan Koagulator
- Ø 500 mm x 0,60 m' Flange Spigot Steel unit 3.000 5,373,415.07 16,120,245.22
Ø 500 mm DI Gate Valve resilient seat lengkap dengan Floor
- unit 1.000 70,161,187.89 70,161,187.89
Stand
- Ø 500 mm Steel pipa Prasedimentsi ke Koagulator m' 25.000 3,496,523.07 87,413,076.77
- Ø 500 mm x 90 Steel Bend fl -fl unit 6.000 6,867,525.15 41,205,150.90
- Ø 500 mm x 45 Steel Bend fl -fl unit 2.000 9,405,119.52 18,810,239.04
- Ø 500 mm Bell Mouth unit 1.000 8,162,420.55 8,162,420.55
- Ø 500 mm Flange las unit 10.000 4,662,933.75 46,629,337.50
- Ø 500 mm Flange las unit 6.000 1,453,901.59 8,723,409.57
- Ø 500 mm Karet Packing unit 10.000 94,350.17 943,501.69
- Ø 500 mm Karet Packing unit 6.000 55,889.57 335,337.41
- 1" x 5" Baud Mur set 200.000 43,761.53 8,752,305.00
- Ø 500 mm x 0,60 m' wall pipe unit 5.000 4,674,336.00 23,371,680.00
- unit 2.000 56,944,651.20 113,889,302.40
- Plat Koagulator Uk. 15 m' x 1,5 m' x 12 mm lengkap konstruksi unit 1.000 62,223,948.15 62,223,948.15
2 Perpipaan Flokulasi
Pintu Air Ukuran 400 mm x 468 mm lengkap dengan Floor
- unit 10.000 14,076,000.00 140,760,000.00
Stand
- Ø 200 mm Steel pipa Sch. 40 m' 20.000 2,381,366.31 47,627,326.14
- Ø 100 mm Steel Pipa Sch 40 m' 96.000 1,526,422.64 146,536,572.98
Ø 200 mm DI Batter Fly Valve Resilent seat lengkap dengan
- unit 2.000 8,039,209.32 16,078,418.64
floor Stand drain
- Ø 200 mm x Ø 100 mm Steel Tee Y fl - fl unit 10.000 4,056,787.66 40,567,876.56
- Ø 100 mm DI Butterfly Valve resilien seat fl - fl unit 18.000 3,584,477.55 64,520,595.90
- Ø 200 mm x 90 Bend Steel All flange unit 2.000 9,314,261.98 18,628,523.95
- Ø 200 mm Karet Packing unit 4.000 58,815.17 235,260.68
- Ø 100 mm Karet Packing unit 20.000 58,815.17 1,176,303.38
- Ø 100 mm Karet Packing unit 28.000 14,103.17 394,888.73
- 3/4" x 4" Baud Mur set 256.000 21,321.00 5,458,176.00
- M16 Baud mur set 384.000 38,075.93 14,621,155.20
- M20 Baud mur set 48.000 51,010.67 2,448,511.92
- Ø 100 mm x 90 Bend Steel All flange unit 12.000 262,710.60 3,152,527.20
- Ø 100 mm Wall Pipe unit 12.000 1,241,871.52 14,902,458.26
- Ø 200 mm Flange Las unit 4.000 766,300.20 3,065,200.80
- Ø 100 mm Flange Las unit 48.000 465,922.50 22,364,280.00
3 Perpipaan Sedimentasi
- Ø 300 mm Steel pipa Sch. 40 drain m' 38.000 6,845,949.48 260,146,080.36
- Ø 300 mm Tee Y Steel fl - fl drain unit 12.000 5,001,457.41 60,017,488.92
- Ø 300 mm DI Butterfly Valve lengkap dengan Pneumatic unit 6.000 92,251,395.75 553,508,374.50
- Ø 300 mm x 90 Steel Bend fl - fl unit 6.000 2,707,678.85 16,246,073.07
- Ø 300 mm Flange las unit 12.000 4,560,809.20 54,729,710.35
- Ø 300 mm Plat Cap unit 6.000 9,529,113.90 57,174,683.40
- Ø 300 mm Karet Packing unit 12.000 58,815.17 705,782.03
- Ø 300 mm Karet Packing unit 6.000 48,189.17 289,135.01
- Ø 700 mm Steel pipa Sch. 40 m' 42.000 4,724,083.56 198,411,509.65
- Ø 700 mm Flange las unit 4.000 13,403,829.60 53,615,318.40
- Ø 700 mm Flange las unit 12.000 4,415,655.00 52,987,860.00
- Ø 700 mm Blange Flange unit 4.000 11,074,155.00 44,296,620.00
- Ø 700 mm x 0,6 m' Flange las unit 4.000 8,955,245.59 35,820,982.37
- Ø 700 mm Karet Packing unit 8.000 108,564.17 868,513.35
- 1" x 5" Baud Mur set 240.000 43,761.53 10,502,766.00

- Highrate Palte Settler Stainless Steel minimal SUS 304 lbr 1,380.000 425,209.46 586,789,050.80

Pengadaan dan pemasangan 0.30 m' x 0.30 m' x 7.05 m' SS


- unit 4.000 12,095,700.00 48,382,800.00
Gutter
Ø 300 mm DI Butterfly Valve lengkap dengan Pneumatic
- unit 6.000 57,640,605.90 345,843,635.40
(position)
- Ø 400 mm pipa PVC untuk penguras unit 40.000 2,300,278.88 92,011,155.00
- M24 Baud mur set 216.000 56,554.13 12,215,691.00
- M33 Baud mur set 192.000 68,194.43 13,093,329.60
- Ø 300 mm Penguras PVC m' 40.000 1,627,528.88 65,101,155.00
4 Perpipaan Filter
- Ø 200 mm Steel pipa Sch. 40 m' 13.500 895,803.34 12,093,345.05
- Ø 300 mm Steel pipa Sch. 40 m' 16.000 2,598,676.66 41,578,826.61
- Ø 200 mm x 90 Bend Steel All flange unit 6.000 1,438,968.96 8,633,813.76
- Ø 200 mm x 90 Bend Steel All flange unit 1.000 1,438,968.96 1,438,968.96
- Ø 200 DI Butterfly Valve fl - fl lengkap Pneumatic unit 6.000 74,271,312.50 445,627,875.00
- Ø 300 DI Butterfly Valve fl - fl lengkap Pneumatic unit 12.000 73,302,550.75 879,630,609.00
- Ø 300 mm x Ø 200 mm Steel Reducer fl -fl unit 6.000 2,718,144.00 16,308,864.00
- Ø 300 mm x Ø 300 mm Steel Tee fl - fl unit 6.000 3,843,840.00 23,063,040.00
- Ø 300 DI Butterfly Valve fl - fl lengkap Pneumatic unit 6.000 110,624,250.00 663,745,500.00
- Ø 300 mm x 0.60 m' Flange Spigot Steel unit 6.000 1,246,080.00 7,476,480.00
- Ø 200 mm Flange las unit 12.000 453,200.00 5,438,400.00
- Ø 200 mm Flange las unit 32.000 453,200.00 14,502,400.00
- Ø 300 mm Flange las unit 18.000 880,000.00 15,840,000.00
- Ø 300 mm Flange las unit 24.000 880,000.00 21,120,000.00
- Ø 200 mm Karet Packing unit 12.000 25,300.00 303,600.00
- Ø 200 mm Karet Packing unit 26.000 25,300.00 657,800.00
- Ø 300 mm Karet Packing unit 18.000 36,850.00 663,300.00
- Ø 300 mm Karet Packing unit 24.000 36,850.00 884,400.00
- Pengadaan dan pemasangan Nosel filter set 3,672.000 143,675.40 527,576,068.80

- Pengadaan dan Pemasangan Gravel Cilica Uk. 5-30 mm m3 32.400 6,930,000.00 224,532,000.00

- Pengadaan dan Pemasangan Silica sand 0.8 - 1.2 mm m3 75.600 13,513,500.00 1,021,620,600.00
- Pengadaan dan Pemasangan Silica sand 0.8 - 1.2 mm m3 75.600 13,513,500.00 1,021,620,600.00

- Ø 200 mm x 0,60 m' wall pipe unit 6.000 641,520.00 3,849,120.00


- Ø 300 mm x 0.60 m' Wall Pipe unit 12.000 3,687,800.60 44,253,607.20
- M24 Baud mur set 504.000 44,187.00 22,270,248.00
- M20 Baud mur set 456.000 39,768.30 18,134,344.80
5 Perpipaan Clear Well ( Out )
- Ø 500 mm x 1000 m' Spigot Flange ( Wall pipe ) unit 1.000 10,348,800.00 10,348,800.00
- Ø 500 mm x Ø 300 mm Steel Tee all flange unit 1.000 8,052,000.00 8,052,000.00
- Ø 500 mm Flange las unit 3.000 1,738,000.00 5,214,000.00
Ø 500 mm DI Gate Valve resilient seat lengkap dengan Floor
- unit 1.000 105,494,400.00 105,494,400.00
Stand
- Ø 300 mm CI Bellmouth unit 1.000 2,566,080.00 2,566,080.00
- Ø 300 mm x 750 mm double Flange ( wall pipe ) unit 3.000 2,354,880.00 7,064,640.00
- Ø 300 mm x 90 Steel Bend all flange unit 2.000 1,872,200.00 3,744,400.00
- Ø 500 mm Karet Packing unit 4.000 42,988.00 171,952.00
- Ø 300 mm Karet Packing unit 4.000 36,850.00 147,400.00
- 1" x 5" Baud Mur set 60.000 29,700.00 1,782,000.00
- 3/4" x 4" Baud Mur set 60.000 22,275.00 1,336,500.00
6 Perpipaan Blower
- Ø 100 mm Steel Pipa Sch 40 m' 23.000 712,031.56 16,376,725.93
- Ø 100 mm x 90 Steel Bend all flange unit 9.000 505,296.00 4,547,664.00
- Ø 100 mm x Ø 100 mm Steel Tee all flange unit 5.000 1,542,024.00 7,710,120.00
- Ø 100 mm Butterfly fl - fl lengkap Pneumatic unit 6.000 18,506,950.00 111,041,700.00
- Ø 100 mm Flange las unit 20.000 205,920.00 4,118,400.00
- Ø 100 mm Flange las unit 15.000 205,920.00 3,088,800.00
- Ø 300 mm Karet Packing unit 20.000 36,850.00 737,000.00
- 5/8" x 4" Baud Mur set 160.000 11,880.00 1,900,800.00
- Ø 50 mm Steel Pipa Sch 40 m 69.000 375,111.00 25,882,659.00
- Ø 50 mm x 90 Steel Bend all flange unit 18.000 41,250.00 742,500.00
- M16 Baud mur set 280.000 29,458.00 8,248,240.00
7 Blower / Air Compressor pencucian
Blower pencucian, Pressure: 35 m', Kap: 4,47 m3/min 1030
- rpm, 18,5 kW, 3 phase, unit 2.000 93,640,762.50 187,281,525.00
size 125 mm, dilengkapi safety valve

Air Compressor, P = 10kg/cm2, Q = m3/hr, dilengkapi tangki


- kapasitas 3000 lt, pressure switch, pressure indikator, safety set 2.000 141,635,844.60 283,271,689.20
valve, air dryer, air drain, dan perpipaan, Motor 18,5kW

Pompa backwash type centrifugal, Q = 50 L/d, Daya motor, P


- unit 2.000 92,224,692.75 184,449,385.50
= 7,5 kW, eff. Min 85%, 4P 50 Hz, 1450 rpm
Perpipaan Tubing Pollyeurthan tube 8mm , Nepple For
- Ls 1.000 107,640,000.00 107,640,000.00
selenoid + Material support
8 Perpipaan Air Wash
- Ø 150 mm Steel Pipa Sch. 40 m' 30.000 2,935,428.03 88,062,840.82
- Ø 150 mm x 90 Steel Bend all flange unit 9.000 4,087,294.35 36,785,649.15
- Ø 150 mm x Ø 100 mm Steel Tee all flange unit 5.000 1,651,488.55 8,257,442.75
- Ø 150 mm Butterfly fl - fl lengkap Pneumatic unit 6.000 49,977,193.35 299,863,160.10
- Ø 150 mm Flange las unit 20.000 2,800,927.35 56,018,547.00
- Ø 150 mm Karet Packing unit 20.000 58,815.17 1,176,303.38
- 5/8" x 4" Baud Mur set 160.000 123,440.10 19,750,416.48
- Ø 200 mm Steel Pipa Sch. 40 unit 8.000 1,181,169.09 9,449,352.70
- Ø 300 mm Steel Pipa Sch. 40 unit 13.000 3,508,958.20 45,616,456.54
- Ø 200 mm Butterfly fl - fl lengkap Pneumatic unit 6.000 17,511,399.60 105,068,397.60
- Ø 300 mm Blange Flange unit 1.000 2,025,874.50 2,025,874.50
- Ø 300 mm x Ø 200 mm Steel Tee all flange unit 6.000 3,519,945.30 21,119,671.80
- Ø 200 mm x 90 Steel Bend fl-fl unit 8.000 1,968,126.47 15,745,011.74
- Reducer Ø 300 mm - Ø 200 mm unit 1.000 3,658,835.40 3,658,835.40
- Ø 300 mm Flange las unit 1.000 1,352,800.20 1,352,800.20
- Ø 200 mm Karet Packing unit 35.000 33,699.17 1,179,470.91
- Ø 300 mm Karet Packing unit 1.000 48,189.17 48,189.17
- M24 Baud mur set 24.000 56,554.13 1,357,299.00
- M20 Baud Mur set 420.000 51,010.67 21,424,479.30
Jumlah 9,464,199,722.96
Pengadaan dan Pemasangan Elektrikal dan Aksesoris
1 Panel Utama Filter dan Kontrol pencucian (M-FL)
- Box Panel unit 1.000 4,974,900.00 4,974,900.00
- Bus Bar 3P+N/1205A +PE dan acessories set 1.000 35,535,000.00 35,535,000.00
MCCB 3P(252-630)A 50KA + Micrologic 2,0 manually
- set 1.000 8,026,150.00 8,026,150.00
operated
- MCCB 3P(100-125)A 36KA + electronic trip set 1.000 3,647,500.00 3,647,500.00
- MCCB 3P(80-100)A 25KA + electronic trip set 1.000 89,524,036.20 89,524,036.20
- MCB 3P/16A, 10A unit 1.000 710,700.00 710,700.00
- MCB 3P/25A 10A unit 3.000 710,700.00 2,132,100.00
- MCB 2P/20A 10A unit 1.000 710,700.00 710,700.00
DOL Starting Motor 0.55kW, 3 komponen, type high
- set 60.000 1,978,588.80 118,715,328.00
performance
- Contactor 3P, 9A, AC3, 380 V unit 60.000 2,842,800.00 170,568,000.00
- Voltmeter (0-500)V, Uk 72x72 unit 1.000 1,208,190.00 1,208,190.00
- VS (Voltage Selector switch, 7 posisi) unit 1.000 2,132,100.00 2,132,100.00
- MCB 1P/4A 6A unit 24.000 2,132,100.00 51,170,400.00
- Sequence control relay (auxiliary relay) dan kelengkapannya te LS 1.000 2,422,981.00 2,422,981.00
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.000 57,500.00 57,500.00
2 Panel Meja Kontrol Filter (MCD-FL)
- Box Panel unit 1.000 4,974,900.00 4,974,900.00
- MCB 1P/4A 6A unit 12.000 2,132,100.00 25,585,200.00
Plug relay 220V, 14 pin, 4 kontak C/O, 5 amp, built in pilot
- unit 60.000 790,298.40 47,417,904.00
light komplit dengan dudukan
- Pilot lamp, Ø 22 mm plastic 220-240 VAC unit 12.000 214,631.40 2,575,576.80
- Push button Ø 22 mm flush, plastic (reset) unit 2.000 1,193,976.00 2,387,952.00
- Push button Ø 22 mm, plastic 220-240 VAC unit 120.000 1,193,976.00 143,277,120.00
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.000 57,500.00 57,500.00
Local Control panel sludge drain valve (LCP-SD 1/2,…LCP-SD-
3
SD10)
Local control panel, type metal (zinc alloy), IP 65, 4 lubang
- LS 6.000 35,535,000.00 213,210,000.00
komlit pust button start-stop, ukuran 80 x 130mm
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.000 57,500.00 57,500.00
4 Panel Kontrol Blower Pencucian (PC-BWR)
- Box Panel unit 1.000 4,974,900.00 4,974,900.00
- Bus Bar 3P+N/205A +PE dan acessories set 1.000 81,564,196.20 81,564,196.20
- MCCB 3P(100-125)A 36KA + electronic trip set 1.000 2,842,800.00 2,842,800.00
- MCB 3P/25A 10A unit 2.000 710,700.00 1,421,400.00
- MCB 2P/16A 10A unit 1.000 710,700.00 710,700.00
- MCB 4P/20A 10A unit 1.000 710,700.00 710,700.00
DOL Starting Motor 0.55kW, 3 komponen, type high
- set 60.000 1,978,588.80 118,715,328.00
performance
- Contactor 3P, 9A, AC3, 380 V unit 60.000 2,842,800.00 170,568,000.00
- Voltmeter (0-500)V, Uk 72x72 unit 1.000 1,208,190.00 1,208,190.00
- VS (Voltage Selector switch, 7 posisi) unit 1.000 2,132,100.00 2,132,100.00
- MCB 1P/4A 6A unit 1.000 2,132,100.00 2,132,100.00
Relay arus bocor (Modul Vigi) 4P, 40A, Sensitifitas = 300
- unit 1.000 2,103,672.00 2,103,672.00
mA
- Voltmeter (0-500)V, Uk 72x72 unit 1.000 1,208,190.00 1,208,190.00
- VS (Voltage Selector switch, 7 posisi) unit 1.000 2,132,100.00 2,132,100.00
- Amperemeter 3P/0-50A unit 4.000 639,630.00 2,558,520.00
- CT 50/5 unit 4.000 639,630.00 2,558,520.00
Star delta Starting Motor 18,5 kW, 3 komponen, type high
- set 4.000 42,642,000.00 170,568,000.00
performance
- (Kordinasi Type 2), terdiri dari :
Fuse carrier (STI), 2P(1P+N), lengkap denan tabung sedring (fuse catrige), type aM,
- set 4.000 355,350.00 1,421,400.00
Ukuran 10,3x38mm, 2A, 500V, 80kA
- Buzzer, 70 dBA unit 1.000 335,450.40 335,450.40
- Hour counter 220V unit 4.000 568,560.00 2,274,240.00
RCP (Relay Control Phase) untuk unbalanced/missing phase 2
- kontak output C/O, Delay unit 4.000 2,132,100.00 8,528,400.00
(0.1-10) detik, (380-500)V
Plug in relay 220V, 14 pin, 4 kontak C/O, 5 amp, built in
- unit 8.000 790,298.40 6,322,387.20
pilot light, komplit dengan dudukan
- Pilot lamp, Ø 22 mm plastic 220-240 VAC unit 7.000 214,631.40 1,502,419.80
- Push button Ø 22 mm flush, plastic (reset) unit 2.000 1,193,976.00 2,387,952.00
- Push button Ø 22 mm, plastic 220-240 VAC unit 8.000 1,193,976.00 9,551,808.00
Plug dan Socket 2P+E, 16A, 220 VAC, Panel mounted
- set 1.000 2,842,800.00 2,842,800.00
komplit
Plug dan Socket 3P+N+E, 16A, 380 VAC, Panel mounted
- set 1.000 2,842,800.00 2,842,800.00
komplit
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.000 57,500.00 57,500.00
5 Panel Ruang Pompa Air Cuci Filter (PP-BW)

- Box Plastic mini pragma pintu tranparant, inbow, 24 modul unit 1.000 8,826,894.00 8,826,894.00

- MCB 3P/16A 10 KA unit 1.000 710,700.00 710,700.00


- RCCB/ELCB, 4P, 25A, Sensitifitas : 30 mA unit 1.000 1,641,717.00 1,641,717.00
- MCB 1P/6A 6 KA unit 3.000 213,210.00 639,630.00
- MCB 1P/10A 6 KA unit 4.000 213,210.00 852,840.00
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.000 57,500.00 57,500.00
6 Panel Ruang Blower (PP-BWR)

- Box Plastic mini pragma pintu tranparant, inbow, 24 modul unit 1.000 8,826,894.00 8,826,894.00
- Box Plastic mini pragma pintu tranparant, inbow, 24 modul unit 1.000 8,826,894.00 8,826,894.00

- MCB 3P/16A 10 KA unit 1.000 710,700.00 710,700.00


- RCCB/ELCB, 4P, 25A, Sensitifitas : 30 mA unit 1.000 1,641,717.00 1,641,717.00
- MCB 1P/6A 6 KA unit 3.000 213,210.00 639,630.00
- MCB 1P/10A 6 KA unit 4.000 213,210.00 852,840.00
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.000 57,500.00 57,500.00
7 Panel Lampu Luar Filter (PP-LR 2)
- Box Panel outdoor type unit 1.000 2,842,800.00 2,842,800.00
- MCB 3P/32A 6 KA unit 1.000 710,700.00 710,700.00
- Contactor, 3P, 32 A AC1, 380 V unit 2.000 2,132,100.00 4,264,200.00
- Photo cell unit 1.000 710,700.00 710,700.00
- MCB 3P/16A 6 KA unit 3.000 710,700.00 2,132,100.00
- Push button dia. 22 mm, plastic 220-240 VAC unit 4.000 1,193,976.00 4,775,904.00
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.000 57,500.00 57,500.00
8 Penerangan Ruang Filter
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 10.000 725,411.49 7,254,114.90
- Lampu Phillips 2 x 36W/220V, WP (water proof) unit 12.000 607,200.00 7,286,400.00
- Single switch 10 A/ 220V plano unit 8.000 24,730.75 197,846.00
- Double Switch 10 A/ 220V plano unit 5.000 24,730.75 123,653.75
- Outlet 10A/2P+E, 220V, WP (water proof) unit 4.000 226,068.15 904,272.60
- Kabel NYM 3 x 2,5 mm2 m 250.000 16,903.50 4,225,875.50
- uPVC Conduit 20 mm m 220.000 12,792.60 2,814,372.00
- uPVC Conduit 25 mm m 2.000 14,214.00 28,428.00
Exhaust fan, Industrial type, wall mounted, 16", komplit base
- set 4.000 670,450.00 2,681,800.00
frame
9 Penerangan Ruang Blower Pencucian
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 8.000 725,411.49 5,803,291.92
- Single switch 10 A/ 220V plano unit 4.000 24,730.75 98,923.00
- Double Switch 10 A/ 220V plano unit 2.000 24,730.75 49,461.50
- Outlet 10A/2P+E, 220V, WP (water proof) unit 1.000 226,068.15 226,068.15
- Kabel NYM 3 x 2,5 mm2 m 50.000 16,903.50 845,175.10
- uPVC Conduit 20 mm m 45.000 12,792.60 575,667.00
- uPVC Conduit 25 mm m 2.000 14,214.00 28,428.00
Exhaust fan, Industrial type, wall mounted, 16", komplit base
- set 1.000 670,450.00 670,450.00
frame

10 Penangkal Petir Bangunan IPA - Filter

- Penangkal Petir type Elctrode dengan Rmin = 60m LS 1.000 49,749,000.00 49,749,000.00

- BC 50 mm2 m 70.000 106,605.00 7,462,350.00


- Clamp BC, 50 mm2 unit 390.000 7,107.00 2,771,730.00
- Air terminal Ø 1, termasuk dudukan, komplit set 4.000 213,210.00 852,840.00
- GIP Ø 2 termasuk socket set 4.000 284,280.00 1,137,120.00
- Grounding rod 3/4 set 4.000 2,406,430.20 9,625,720.80
- Pipa PVC Ø 1, termasuk clamp set 8.000 21,321.00 170,568.00
- Box control 30x30x70 cm LS 2.000 568,560.00 1,137,120.00
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.000 9,433,450.00 9,433,450.00
11 Instalasi Penerangan
- Lampu Mercury 250 watt Sorot unit 2.000 313,958.05 627,916.10
- Lampu Mercury 250 watt Sorot unit 2.000 313,958.05 627,916.10
- Kabel dari P. Penerangan R. Kimia ke Disconecting Switch
- - NYFGBY 4 x 2,5 mm2 meter 75.000 152,924.00 11,469,300.00
- Kabel dari DS ke lampu2
- - NYY 3 x 2,5 mm2 meter 40.000 106,556.00 4,262,240.00
- Pipa PVC 20mm meter 40.000 22,024.80 880,992.00
- Disconecting switch Outdoor Type unit 1.000 1,545,600.00 1,545,600.00
12 Panel Lokal Valve Sedimentasi -

- Panel Lokal Filter Outdoor type double door dengan support unit 2.000 6,762,000.00 13,524,000.00

- Selenoid valve + manifold 6 selenoid (by others)


Plug in relay 220V, 14 pin, 4 kontak C/O, 5 amp, built in
- unit 6.000 58,650.00 351,900.00
pilot light, komplit dengan dudukan
- Illuminated Push Button Green, 220VAC unit 6.000 596,988.00 3,581,928.00
- Illuminated Push Button Red, 220VAC unit 6.000 596,988.00 3,581,928.00
- Selector Switch 3 Posisi unit 6.000 429,097.20 2,574,583.20
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.000 57,500.00 57,500.00
Jumlah 1,737,448,207.22
- PEKERJAAN MEKANIKAL DAN ELEKTRIKAL BANGUNAN KIMIA DAN CHLORINE 5,482,876,460.72
a Pengadaan dan Pemasangan Mekanikal dan aksesoris
1 Crane untuk Ruang Kimia -

Electric Motor Hoist crane, Kapasitas 1 ton, lengkap dengan


- set 1.00 141,361,072.80 141,361,072.80
span, flat bar, conductor dan pendant push button ( R.Kimia )

Electric Motor Hoist crane, Kapasitas 2 ton, lengkap dengan


- set 1.00 183,912,103.20 183,912,103.20
span, flat bar, conductor dan pendant push button ( R. Chlor )

2 Pompa Dosing dan pengaduk


Mixer 580 rpm, Drive: 4kW, 380V, dilengkapi dengan gear,
- reducer, stainless steel shaft set 4.00 74,120,324.40 296,481,297.60
support, control dan drain oil.
Pompa dozing alum Q = 250 l/jam; P=6,9 bar, Motor =
- unit 3.00 68,366,497.20 205,099,491.60
1,1kW, 380V, 3 phase
Pompa dosing soda ash Q = 450l/jam; P = 6,9 bar, Motor =
- unit 3.00 225,411,297.60 676,233,892.80
0,55kW, 380V, 3 phase
- IWF Baja 150 x 300 mm Kg 910.16 - -
Jumlah 1,503,087,858.00
c Pengadaan Elektrikal dan aksesoris
1 Panel utama / control Pompa Dosing Kimia (M-PK)
- Box Panel Pompa Air Bersih unit 1.00 14,214,000.00 14,214,000.00
- Bus Bar 3P+N/125A +PE dan acessories set 1.00 35,535,000.00 35,535,000.00
- MCCB 3P(100-125)A 36KA + electronic trip set 1.00 3,647,500.00 3,647,500.00
MCCB 3P(252-630)A 50KA + Micrologic 2,0 manually
- set 1.00 8,026,150.00 8,026,150.00
operated
- MCB 2P/25 A, 10 KA unit 2.00 710,700.00 1,421,400.00
- MCB 2P/16 A, 10 KA unit 1.00 710,700.00 710,700.00
- MCB 4P/20 A, 10 KA unit 1.00 710,700.00 710,700.00
Relay arus bocor (Modul Vigi) 4P, 40A, Sensitivitas = 300
- unit 1.00 2,103,672.00 2,103,672.00
mA
- MCB 3P/20 A, 10 KA unit 1.00 710,700.00 710,700.00
- MCB 3P/25 A, 10 KA unit 1.00 710,700.00 710,700.00
- Isolating switch, 380 V, 3P, 40A unit 2.00 1,641,717.00 3,283,434.00
- Voltmeter (0-500)V, Uk 72x72 unit 1.00 1,208,190.00 1,208,190.00
- VS (Voltage Selector switch, 7 posisi) unit 1.00 2,132,100.00 2,132,100.00
DOL Starting Motor 0.55kW, 3 komponen, type high
- set 4.00 1,978,588.80 7,914,355.20
performance
DOL Starting Motor 1.1 kW, 3 komponen, type high
- set 4.00 1,978,588.80 7,914,355.20
performance
DOL Starting Motor 4 kW, 3 komponen, type high
- set 4.00 2,137,785.60 8,551,142.40
performance
Fuse carrier (STI), 2P (1P + N), lengkap dengan tabung
- sekring (fuse catrige), type aM, Ukuran 10,3x38mm, 2A, set 12.00 355,350.00 4,264,200.00
500V, 80kA
- Buzzer, 70 dBA unit 1.00 335,450.40 335,450.40
RCP (Relay Control Phase) untuk unbalanced/missing phase 2
- unit 2.00 2,132,100.00 4,264,200.00
kontak output C/O, Delay (0.1-10) detik, (380-500)V
Plug in relay 220V, 14 pin, 4 kontak C/O, 5 amp, built in
- unit 24.00 790,298.40 18,967,161.60
pilot light, komplit dengan dudukan
- Water Level Control (WLC), Time delay (0.1-10)detik, sensitif unit 4.00 2,132,100.00 8,528,400.00
- Pilot lamp, Ø 22 mm plastic 220-240 VAC unit 36.00 214,631.40 7,726,730.40
- Push button Ø 22 mm flush, plastic (reset) unit 2.00 1,492,470.00 2,984,940.00
Plug dan Socket 2P + E 16A, 220 VAC, Panel mounted,
- set 1.00 2,842,800.00 2,842,800.00
komplit
Plug dan Socket 3P + N + E 16A, 380 VAC, Panel mounted,
- set 1.00 2,842,800.00 2,842,800.00
komplit

- Box Plate metal, 2100x800x600 mm, Floor Standing Unit 1.00 13,838,160.00 13,838,160.00

- MCCB 3 POLE, 250 A Unit 1.00 13,644,750.00 13,644,750.00


- MCCB 3 POLE, 80 A Unit 1.00 2,764,692.00 2,764,692.00
- MCB 3 POLE, 6 A Unit 8.00 1,650,700.80 13,205,606.40
- MCB 3 POLE, 10 A Unit 4.00 1,650,700.80 6,602,803.20
- MCB 2 POLE, 6 A Unit 2.00 1,232,036.40 2,464,072.80
- MCB 1P/6A 6 KA Unit 3.00 50,701.20 152,103.60
- Indicator Lamp R, S, T Unit 3.00 79,212.00 237,636.00
Fuse carrier (STI), 2P (1P + N), lengkap dengan tabung
- sekring (fuse catrige), type aM, Ukuran 10,3x38mm, 2A, Unit 3.00 355,350.00 1,066,050.00
500V, 80kA

- Current Transformator 250/5 A Unit 3.00 1,045,405.20 3,136,215.60


- Contacor LC1D09 Unit 12.00 403,788.00 4,845,456.00
- Thermal Overload LRD06 Unit 4.00 1,223,535.60 4,894,142.40
- VSD 380/3P Unit 8.00 16,422,000.00 131,376,000.00
- Power Supply DC 220VAC / 24VDC 10A Unit 1.00 7,543,494.00 7,543,494.00
- Illuminated Push Button Red, 220VAC Unit 14.00 596,988.00 8,357,832.00
- Illuminated Push Button Green, 220VAC Unit 14.00 596,988.00 8,357,832.00
- Indicator Lamp Yellow, 220VAC Unit 14.00 79,212.00 1,108,968.00
- Push Button Unit 1.00 79,212.00 79,212.00
- Buzzer, 70 dBA Unit 1.00 25,530.00 25,530.00
- Emergency Stop Unit 1.00 497,103.60 497,103.60
Plug in relay 220V, 14 pin, 4 kontak C/O, 5 amp, built in
- Unit 24.00 58,650.00 1,407,600.00
pilot light, komplit dengan dudukan
- Exhaust Fan 6" Unit 2.00 3,619,795.20 7,239,590.40
- Dust Filter Unit 4.00 796,563.60 3,186,254.40
- Perakitan dan Pemasangan lengkap termasuk aksesoris Unit 1.00 57,500.00 57,500.00

2 Panel Penerangan Ruang Kimia (PP-RK)

- Box Plastic mini pragma pintu tranparant, inbow, 24 modul unit 1.00 8,826,894.00 8,826,894.00

- MCB 3P/16A 10 KA unit 1.00 710,700.00 710,700.00


- RCCB/ELCB, 4P, 25A, Sensitifitas : 30 mA unit 1.00 1,641,717.00 1,641,717.00
- MCB 1P/6A 6 KA unit 3.00 213,210.00 639,630.00
- MCB 1P/10A 6 KA unit 1.00 213,210.00 213,210.00

- Box Plate metal, 600x500x200 mm, Wall Mounting unit 1.00 5,796,000.00 5,796,000.00

- MCB 3P/6A, 6 KA unit 1.00 1,650,700.80 1,650,700.80


- RCCB/ELCB, 4P, 10A, Sensitifitas : 30 mA unit 1.00 1,166,928.00 1,166,928.00
- MCB 1P/4A 6 KA unit 5.00 202,860.00 1,014,300.00
- MCB 1P/6A 6 KA unit 1.00 50,701.20 50,701.20
- MCB 3P/4A 6 KA unit 1.00 1,941,660.00 1,941,660.00
- Time Switch 24 Jam unit 1.00 1,655,337.60 1,655,337.60
- Magnetic Contactor 10A unit 1.00 1,746,141.60 1,746,141.60
- Indicator Lamp R, S, T unit 3.00 79,212.00 237,636.00
- Mini Fuse 2A unit 4.00 176,584.80 706,339.20
- Selector Switch 3 Posisi unit 1.00 429,097.20 429,097.20
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 57,500.00 57,500.00

3 Penerangan Ruang Kimia


- Lampu philips 2 x 18W/220V, WP (Water proof) unit 15.00 725,411.49 10,881,172.35
- Single switch 10 A/ 220V plano unit 6.00 24,730.75 148,384.50
- Double Switch 10 A/ 220V plano unit 3.00 24,730.75 74,192.25
- Outlet 10A/2P+E, 220V, WP (water proof) unit 3.00 226,068.15 678,204.45
- Kabel NYM 3 x 2,5 mm2 m 100.00 16,903.50 1,690,350.20
- uPVC Conduit 20 mm m 75.00 12,792.60 959,445.00
- uPVC Conduit 25 mm m 2.00 14,214.00 28,428.00
- Lampu TL WP 2 X 18 watt Unit 12.00 455,400.00 5,464,800.00
- Lampu TL WP 2 X 36 watt Unit 14.00 607,200.00 8,500,800.00
- Lampu DL 1 X 20watt Unit 1.00 82,110.00 82,110.00
- Outlet 10 A/2P+E 220V Unit 1.00 226,068.15 226,068.15
- Stop kontak AC Unit 1.00 50,916.25 50,916.25
- Double Switch 10 A/ 220V plano Unit 4.00 33,327.00 133,308.00
- Single switch 10 A/ 220V plano Unit 2.00 26,979.00 53,958.00
- Instalasi titik lampu Titik 27.00 379,500.00 10,246,500.00
- Instalasi stop kontak Titik 2.00 379,500.00 759,000.00
- Kabel dari Panel Penerangan R. Kimia ke P. Kimia
- - NYY 4 x 2,5 mm2 meter 10.00 65,688.00 656,880.00
- - BC 4 mm2 meter 10.00 39,412.80 394,128.00
4 Penangkal Petir Bangunan Kimia
- Penangkal Petir type Elctrode dengan Rmin = 60m LS 1.00 10,822,650.43 10,822,650.43
- BC 50 mm2 m 82.00 54,450.00 4,464,900.00
- Clamp BC, 50 mm2 unit 425.00 40,383.02 17,162,785.20
- Air terminal Ø 1, termasuk dudukan, komplit set 12.00 686,511.41 8,238,136.90
- GIP Ø 2 termasuk socket set 4.00 662,281.60 2,649,126.39
- Grounding rod 3/4 set 4.00 282,681.17 1,130,724.67
- Grounding rod 3/4 set 1.00 282,681.17 282,681.17
- Pipa PVC Ø 1, termasuk clamp set 4.00 290,757.78 1,163,031.10
- Box control 30x30x70 cm LS 1.00 848,043.50 848,043.50
- - NYA 50 mm2 meter 30.00 150,150.00 4,504,500.00
- GIP Ø 3 termasuk socket meter 1.00 770,000.00 770,000.00
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 57,500.00 57,500.00
5 Peralatan elektroklorinasi

Onsite Chlorine Disinfectant Generator kap. 4 kg.Cl/jam,


- Unit 1.00 2,435,400,000.00 2,435,400,000.00
termasuk sel elektroda, power module, dan terminal control
- Inline water filter kap. 4 m3/jam, tekanan kerja 3-6 bar Unit 1.00 106,605,000.00 106,605,000.00

- Water softener dg hardness monitoring system Unit 1.00 71,070,000.00 71,070,000.00


- Water chiller system, termasuk power control Unit 1.00 105,600,000.00 105,600,000.00
Submersible pump kap. 2500 L/jam, tekanan 5 bar, termasuk
- Unit 1.00 106,605,000.00 106,605,000.00
power control

HDPE Brine tank kap. 4 m3, termasuk drain, corong inlet


- garam, soft water inlet with automated magnetic valve, brine Unit 1.00 106,605,000.00 106,605,000.00
outlet, overflow

HDPE brine tnak kap. 0,5 m3, termasuk inlet, outlet, drain, dan
- Unit 1.00 71,070,000.00 71,070,000.00
overflow

Brine dosing pump, kap. Min. 100 L/jam, tekanan 5 bar,


- termasuk control panel, push button, indicator light, integrated Unit 2.00 52,800,000.00 105,600,000.00
control ready

HDPE Production tank 30 m3, dilengkapi dengan water level


- Unit 1.00 106,605,000.00 106,605,000.00
sensor
- Power stabiliser kap. 30 kVA Unit 1.00 42,642,000.00 42,642,000.00
6 Pemasangan Peralatan elektroklorinasi
- Pemasangan perpipaan sistem elektroklorinasi LS 1.00 11,220,000.00 11,220,000.00
- Pemasangan pengkabelan sistem elektroklorinasi LS 1.00 22,000,000.00 22,000,000.00
- Pemasangan sistem pembubuhan larutan klorin LS 1.00 105,600,000.00 105,600,000.00
Pemrograman sistem kendali setempat dan kendali jarak jauh,
- LS 1.00 49,280,000.00 49,280,000.00
berikut piranti lunak

Pengujian komisioning dan pelatihan minimal 5 hari, termasuk


- LS 1.00 24,640,000.00 24,640,000.00
dokumentasi dan manual operasi pemeliharaan

Jumlah 3,979,788,602.72

- PEKERJAAN MEKANIKAL DAN ELEKTRIKAL BANGUNAN GENSET 3,033,602,887.95


a Pengadaan Mekanikal dan Accessories

Generator set, Kapasitas: 315 kW, 380/220V, komplit tangki harian


1 dengan perpipaan, kontrol panel PCC, karet peredam getaran, peredam set 1 666,770,575.00 666,770,575.00
suara dan kelengkapan lainnya (Lihat spesifikasi khusus)

Fuel Storage tank procurement cap. of 5.000 lt termasuk Suporting


2 material, termasuk perpipaan, strainer, level switch pada control panel unit 1 106,343,582.00 106,343,582.00
bahan bakar, pompa tangan, electric pump dll.
Pengadaan dan pemasangan Rock Wool, tebal 5cm (2") pada dinding
dalam Ruangan, Kawat anyaman galvanized untuk pelindung bahan
3 Glass wool dan kain pembungkus tahan api m2 135.55 2,463,875.00 333,978,256.25
Generator set, lengkap dengan pelidung kain Catton tebal dan kawat
Ram.
Jumlah 1,107,092,413.25
c Pengadaan Elektrikal dan Accessories
1 Trafo dan panel TM
- Trafo 500 kVA, 20kV/380-220V, Dyn 5, dan kelengkapannya. set 1.00 184,586,730.00 184,586,730.00
Panel Tegangan Menengah (cubicle) 500 kVA 24 kV,
- set
incoming dan outgoing with circuit breaker 1.00 512,114,550.00 512,114,550.00
2 Panel Automatic Main Failure (AMF) dan Change Over Switch (COS)
Panel Automatic Main Failure untuk Genset Cap 315 KvA,
- 1.00 444,213,264.00
dengan PCC set 444,213,264.00
Change Over Switch untuk kapasitas daya 1500 KvA, plus
- 1.00
interlock system set 6,970,109.94 6,970,109.94
- Box Panel, ukuran T:1800 X L:800 X D:600, free standing type set 1.00 3,850,000.00 3,850,000.00
3 Panel Induk Utama, LVM-DP
- Box Plate metal, 2000x(800+800+800)x1000 mm, Floor Standi unit 1.00 20,527,500.00 20,527,500.00
- Bus Bar 3P+N/2000A + PE dan accessories set 1.00 8,024,914.53 8,024,914.53
ACB 4P/(640-2000)A 50KA (Min) dilengkapi dengan unit trip
- Motor mechanism module 220/240V AC dan kontak-kontak set 1.00 149,206,727.00 149,206,727.00
bantu (Lihat spek khusus)

- MCCB 4P(25-40)A 25KA + electronic trip ke Kantor pengelola set 1.00 2,842,800.00 2,842,800.00
- MCCB 3P(13-16)A 25KA + electronic trip ke PP. R Genset + P set 1.00 2,842,800.00 2,842,800.00
- Pilot lamp, Ø 22mm, plastic 220-240 VAC set 8.00 214,631.40 1,717,051.20
- Push button modular plastic 220-240 VAC set 4.00 1,492,470.00 5,969,880.00
Accessories penunjang termasuk relay bantu, isolator kabel-
- kabel, terminal, fuse, ls 1.00 13,325,625.00 13,325,625.00
supporting fanel dll sebagai pelengkap system
- Kapasitor bank, komplit lamp, push button (500 kvar) (LVMDP set 1.00 287,767,639.50 287,767,639.50
- MCCB 3 POLE, 1000 A Unit 1.00 53,130,000.00 53,130,000.00
- MCCB 3 POLE, 160 A Unit 1.00 12,507,687.50 12,507,687.50
- MCB 1P/6A 6 KA Unit 6.00 46,476.10 278,856.60
- Mini Fuse Unit 6.00 161,869.40 971,216.40
Plug in relay 220V, 14 pin, 4 kontak C/O, 5 amp, built in
- Unit 10.00 53,762.50 537,625.00
pilot light, komplit dengan dudukan
- Indikator Lamp, Pilot Lamp Ø22mm, 220V Unit 8.00 88,550.00 708,400.00
- Illuminated Push Button, 220VAC Unit 4.00 547,239.00 2,188,956.00
- Power Meter Digital Unit 1.00 2,125,200.00 2,125,200.00
- Current Transformator 2000/5A Unit 6.00 5,041,505.70 30,249,034.20
- Selector Switch 3 Posisi Unit 2.00 393,339.10 786,678.20
- Box Plate metal, 500 x 400 200 mm, Wall Mounting Unit 1.00 4,046,380.80 4,046,380.80
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 57,500.00 57,500.00
4 Panel Penerangan Ruang Listrik Utama (PP-RL)
- Box Plastic mini pragma pintu tranparant, inbow, 24 modul unit 1.00 342,562.00 342,562.00
- MCB 3P/16A 10 KA unit 1.00 218,648.93 218,648.93
- RCCB/ELCB, 4P, 25A, Sensitifitas : 30 mA unit 1.00 653,834.23 653,834.23
- MCB 1P/6A 6 KA unit 3.00 46,476.10 139,428.30
- MCB 1P/10A 6 KA unit 4.00 46,476.10 185,904.40
- Box Plate metal, 600x500x200 mm, Wall Mounting unit 1.00 5,313,000.00 5,313,000.00
- MCB 3P/6A, 6 KA unit 1.00 1,513,142.40 1,513,142.40
- RCCB/ELCB, 4P, 10A, Sensitifitas : 30 mA unit 1.00 1,069,684.00 1,069,684.00
- MCB 1P/4A 6 KA unit 15.00 185,955.00 2,789,325.00
- Time Switch 24 Jam unit 1.00 1,517,392.80 1,517,392.80
- Magnetic Contactor 10A unit 1.00 1,600,629.80 1,600,629.80
- Indikator Lamp, Pilot Lamp Ø22mm, 220V unit 3.00 57,500.00 172,500.00
- Mini Fuse 2A unit 3.00 161,869.40 485,608.20
- Selector Switch 3 Posisi unit 1.00 393,339.10 393,339.10
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 57,500.00 57,500.00
5 Penerangan Ruang listrik utama
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 8.00 455,400.00 3,643,200.00
- Lampu philips 36W/220V, Industrial Type unit 1.00 607,200.00 607,200.00
- Lampu philips 2 x 36W/220V, Water proof unit 4.00 607,200.00 2,428,800.00
- Single switch 10 A/ 220V plano unit 6.00 24,730.75 148,384.50
- Double Switch 10 A/ 220V plano unit 2.00 30,549.75 61,099.50
- Outlet 10A / 220 V unit 2.00 92,073.30 184,146.60
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 2.00 226,068.15 452,136.30
- Kabel NYM 3 x 2,5 mm2 m 160.00 16,903.50 2,704,560.32
- uPVC Conduit 20 m m 140.00 12,792.60 1,790,964.00
- uPVC Conduit 25 m m 2.00 14,214.00 28,428.00
- Exhaust fan, Industrial type, wall mounted, 16", komplit base fr set 2.00 670,450.00 1,340,900.00
- Lampu TL / DL 2 X 18 watt unit 21.00 130,410.00 2,738,610.00
- Lampu PJU, 56 watt + timer unit 30.00 130,410.00 3,912,300.00
- Outlet 10 A/2P+E 220V unit 4.00 289,510.20 1,158,040.80
- Double Switch 10 A/ 220V plano unit 4.00 39,123.00 156,492.00
- Exhaust Fan 16 Inch, 80 watt ( 2 unit di R. panel LVMDP) unit 5.00 2,892,493.80 14,462,469.00
- Kabel penerangan ke PJU
- - NYFGBY 2 x 4 mm2 meter 612.00 73,290.42 44,853,737.04
- Kabel penerangan ke PJU
- - NYFGBY 2 x 2,5 mm2 meter 163.00 68,334.84 11,138,578.92
- Kabel dari LVMDP ke P. Penerangan R. Genset
- NYFGBY 4 x 6 mm2 meter 12.00 122,585.40 1,471,024.80
- - BC 4 mm2 meter 10.00 53,207.28 532,072.80
- MCB 4 Amp untuk tiap2 tiang lampu unit 10.00 450,696.96 4,506,969.60
- Instalasi titik lampu titik 21.00 997,636.50 20,950,366.50
- Intalasi titik lampu PJU titik 30.00 1,108,485.00 33,254,550.00
- Instalasi Stop kontak titik 4.00 665,091.00 2,660,364.00
- Instalasi exhaust fan titik 5.00 665,091.00 3,325,455.00
Jumlah 1,926,510,474.70

- PEKERJAAN MEKANIKAL DAN ELEKTRIKAL BANGUNAN IPAL 39,456,715.60


Pengadaan / Pemasangan elektrikal dan aksesoris
Panel Penerangan Bangunan Worskshop, kantor dan Gudang
- Penangkal Petir type Elctrode dengan Rmin = 60m LS 1.00 17,650,758.98 17,650,758.98
- Grounding Anchor Rot 4 meter (3/4) unit 5.00 1,255,800.00 6,279,000.00
- - NYA 50 mm2 meter 10.00 244,881.00 2,448,810.00
- Clamp Anchor Rot 50 mm2 unit 2.00 27,627.60 55,255.20
- Air terminal Ø 1, termasuk dudukan, komplit set 1.00 277,173.00 277,173.00
- GIP Ø 3 unit 1.00 2,953,641.60 2,953,641.60
- GIP Ø 2 unit 1.00 200,928.00 200,928.00
- Box control 30x30x70 cm unit 1.00 739,128.00 739,128.00
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 1,317,220.82 1,317,220.82
- Pengesahan Depnaker LS 1.00 7,534,800.00 7,534,800.00
Jumlah 39,456,715.60
- PEKERJAAN MEKANIKAL DAN ELEKTRIKAL BANGUNAN RESERVOIR KAPASITAS 3600 M3 6,495,841,312.51
a Pengadaan dan Pemasangan Mekanikal dan Accesories
1 Pompa dan Accessories
- Pompa Centifugal Q 10 l/dt - Head 100 m' 40 KW Efisiensi 75 Unit 2.00 266,992,966.55 533,985,933.10
- Kabel Power NYFGBY 4 x 120 mm m' 300.00 1,184,612.00 355,383,600.00
- Panel Pompa Variable Speed Drive Paralel Alternate 3 x 250 K set 1.00 226,918,503.24 226,918,503.24
- Kabel Power NYFGBY 4 x 95 mm m' 75.00 335,500.00 25,162,500.00
- Skun Kabel 300 mm (Cu) set 24.00 93,500.00 2,244,000.00
- Skun Kabel 95 mm (Cu) set 24.00 21,450.00 514,800.00
- Pressure Transmiter Skala 0 - 15 Bar / 4 - 20 mA Unit 3.00 2,904,000.00 8,712,000.00
- Kabel Data 3 x 2,5 mm m' 30.00 36,300.00 1,089,000.00
- Electrode level set 3.00 330,000.00 990,000.00
2 Perpipaan Hisap (Suction)
- Ø 150 mm Strainer staenles steel fl unit 3.00 2,439,360.00 7,318,080.00
- Ø 150 mm x 0,60 m' Double fl - fl ( Wall pipa ) unit 3.00 1,702,800.00 5,108,400.00
- Ø 150 mm DI Gate Valve resilient seat unit 9.00 9,986,803.20 89,881,228.80
- Ø 700 mm Header Steel Pipe m' 18.00 5,626,698.00 101,280,564.00
- Ø 700 mm Flange las unit 6.00 3,190,000.00 19,140,000.00
- Ø 700 mm Blank Flange unit 6.00 14,320,152.00 85,920,912.00
- Ø 150 mm Steel pipa unit 9.00 1,121,218.91 10,090,970.18
- Ø 150 mm x Ø 100 mm Steel Concentris Reducer fl -fl unit 9.00 985,600.00 8,870,400.00
- Ø 150 mm Flexible Joint unit 9.00 1,011,225.60 9,101,030.40
- Ø 150 mm Flange buta lubang disesuaikan dengan Pompa unit 9.00 191,400.00 1,722,600.00
- Ø 150 mm Flange las unit 18.00 359,333.33 6,468,000.00
- Ø 150 mm Flange las unit 18.00 168,666.67 3,036,000.00
- Ø 700 mm Karet Packing unit 6.00 56,100.00 336,600.00
- Ø 150 mm Karet Packing unit 24.00 9,951.33 238,832.00
- Ø 100 mm Karet Packing unit 3.00 11,366.67 34,100.00
- 1" x 5" Baud mur unit 432.00 29,700.00 12,830,400.00
- 1 1/4" x 5" Baud mur unit 120.00 29,700.00 3,564,000.00
- Ø 400 mm x 0,60 m' ( Wall pipa ) unit 4.00 7,814,400.00 31,257,600.00
- Ø 400 mm Butterfly valve fl-fl resilient seat unit 7.00 66,813,120.00 467,691,840.00
- Ø 400 mm Flange Adaptor unit 4.00 4,950,000.00 19,800,000.00
- Ø 400 mm Flexible Joint unit 3.00 18,562,500.00 55,687,500.00
- Ø 400 mm x Ø 250 mm Steel Concentris Reducer fl -fl unit 3.00 4,356,000.00 13,068,000.00
- Ø 400 mm Flange las unit 19.00 748,000.00 14,212,000.00
- Ø 400 mm Karet Packing unit 25.00 35,816.00 895,400.00
- M24 Baud mur set 36.00 44,187.00 1,590,732.00
- M27 Baud mur set 400.00 48,605.70 19,442,280.00
- M39 Baud mur set 48.00 56,320.00 2,703,360.00
3 Perpipaan Tekan (Discharge)
- Ø 150 mm x Ø 100 Steel Reducer fl - fl unit 3.00 1,747,680.00 5,243,040.00
- Ø 150 mm Flange las m' 6.00 506,000.00 3,036,000.00
- Ø 150 mm x 750mm' Steel Double Flange (wall pipe) unit 3.00 1,842,720.00 5,528,160.00
- Ø 150 mm Steel pipa m' 18.00 1,136,190.00 20,451,420.00
- Ø 150 mm x 45 Steel Bend fl - fl unit 3.00 1,181,400.00 3,544,200.00
- Ø 150 mm DI Gate Valve PN 16 Resilien seat unit 6.00 9,986,803.20 59,920,819.20
- Ø 150 mm DI Cek Valve PN 16 Resilian seat unit 3.00 11,487,168.00 34,461,504.00
- Ø 150 mm Flexible Joint PN 16 unit 3.00 1,516,838.40 4,550,515.20
- Ø 150 mm Karet Packing unit 21.00 34,100.00 716,100.00
- Ø 100 mm Karet Packing unit 3.00 25,300.00 75,900.00
- 3/4" x 4" Baud Mur unit 288.00 22,275.00 6,415,200.00
- 12,5 mm x 0,50 Steel Pipa risser m' 3.00 44,770.00 134,310.00
- 12,5 mm Ball Valve unit 3.00 228,800.00 686,400.00
- Manometer Scala 0 - 15 Kg/cm2 unit 3.00 200,112.00 600,336.00
- 12,5 mm x 90 GWI Bend unit 2.00 10,454.40 20,908.80
- 12,5 mm x 12,5 mm GWI Tee unit 1.00 11,880.00 11,880.00
- Ø 150 mm Butterfly valve fl-fl resilient seat unit 3.00 13,060,723.50 39,182,170.50
- Ø 150 mm Flange Adaptor unit 3.00 1,839,200.00 5,517,600.00
- Ø 150 mm Flexible Joint unit 3.00 2,145,000.00 6,435,000.00
- Ø 150 mm x Ø 100 mm Steel Reducer fl -fl unit 3.00 1,359,072.00 4,077,216.00
- Ø 150 mm x 45 Steel Bend fl - fl unit 3.00 577,500.00 1,732,500.00
- Ø 150 mm Flange las unit 3.00 440,000.00 1,320,000.00
- Ø 150 mm Karet Packing unit 18.00 18,425.00 331,650.00
- M24 Baud mur set 216.00 44,187.00 9,544,392.00
- M20 Baud mur set 36.00 39,768.30 1,431,658.80
- Ø 700 mm DI Gate Valve metal resilient Seated all flange unit 1.00 133,626,240.00 133,626,240.00
- Ø 700 mm DI Cek Valve PN 16 Resilian seat unit 1.00 176,000,210.10 176,000,210.10
- Box Uk. 2,4x 1,5 x 1,5 m' unit 2.00 14,437,500.00 28,875,000.00
4 Perpipaan Pengumpul (Header)
- Ø 700 mm Header Steel Pipe m' 10.50 5,626,698.00 59,080,329.00
- Ø 700 mm x Ø 500 mm Steel Reducer flange - flange unit 2.00 16,060,000.00 32,120,000.00
- Ø 700 mm Flange las unit 8.00 12,457,368.00 99,658,944.00
- Ø 700 mm Blank Flange unit 1.00 14,320,152.00 14,320,152.00
- Ø 500 mm x 90° Steel Bend flange - flange unit 1.00 6,177,600.00 6,177,600.00
- Ø 500 mm Flange las unit 3.00 4,311,014.40 12,933,043.20
- Ø 500 mm Steel Dresser Joint unit 1.00 11,864,160.00 11,864,160.00
- Box Water Meter Uk. 200 x 1,5 x 2,5 m' Unit 1.00 14,437,500.00 14,437,500.00
- Ø 500 mm x 0,60 m' Pipa Inlet ( Wall Pipe ) unit 3.00 4,745,216.30 14,235,648.90
- 1" x 5" Baud Mur set 80.00 29,700.00 2,376,000.00
- Ø 500 mm Karet Packing unit 2.00 42,988.00 85,976.00
- Ø 700 mm Karet Packing unit 2.00 56,100.00 112,200.00
- Ø 700 mm Karet Packing unit 7.00 56,100.00 392,700.00
- Ø 700 mm Steel Pipe m' 83.00 5,626,698.00 467,015,934.00
- Ø 700 mm x 45° Steel Bend flange - flange unit 2.00 9,735,000.00 19,470,000.00
- Ø 700 mm x 11.25° Steel Bend flange - flange unit 5.00 4,158,000.00 20,790,000.00
- M39 Baud mur set 216.00 56,320.00 12,165,120.00
5 Perpipaan Over Flow dan Penguras
- Ø 450 mm Overflow Steel Pipe m' 10.00 - -
- Ø 450 mm Penguras Steel Pipe m' 82.00 - -
- Ø 450 mm Penguras PVC m' 50.00 3,526,875.00 176,343,750.00
- Ø 450 mm Penguras PVC m' 71.50 3,526,875.00 252,171,562.50
- A.F. Gate Valve PN 10 Ø 450 mm unit 3.00 - -
- Cek Valve Ø 450 mm Steel unit 2.00 54,695,193.30 109,390,386.60
- Cek Valve Ø 450 mm Steel unit 1.00 43,756,154.64 43,756,154.64
- Ø 450 mm Karet Packing unit 10.00 36,850.00 368,500.00
- Ø 450 mm Karet Packing unit 2.00 25,300.00 50,600.00
- Ø 450 mm Flange las unit 10.00 880,000.00 8,800,000.00
- Ø 450 mm Flange Las unit 2.00 453,200.00 906,400.00
- M24 Baud mur set 120.00 44,187.00 5,302,440.00
- M20 Baud mur set 24.00 39,768.30 954,439.20
6 Perpipaan Pompa Back wash Air dan Udara
- Ø 100 mm Steel pipe SCH 40 m' 31.50 712,031.56 22,428,994.20
- Ø 200 mm Steel pipe SCH 40 m' 31.50 895,803.34 28,217,805.12
- Ø 300 mm Steel pipe SCH 40 m' 6.00 2,598,676.66 15,592,059.98
- Ø 300 mm x Ø 200 mm Steel Reducer flange - flange unit 2.00 2,718,144.00 5,436,288.00
- Ø 200 mm x Ø 150 mm Steel Reducer flange - flange unit 2.00 990,000.00 1,980,000.00
- Ø 100 mm Butterfly valve seat fl-fl include actuator unit 4.00 4,158,000.00 16,632,000.00
- Ø 200 mm Butterfly valve Lengkap dengan Pneumatic unit 2.00 13,727,191.50 27,454,383.00
- Ø 200 mm flexsible joint unit 4.00 3,033,676.80 12,134,707.20
- Ø 300 mm Blank flange unit 2.00 1,485,000.00 2,970,000.00
- Ø 100 mm x 90° Steel Bend flange - flange unit 2.00 132,000.00 264,000.00
- Ø 200 mm x 90° Steel Bend flange - flange unit 6.00 1,438,968.96 8,633,813.76
- Ø 100 mm Flange las unit 4.00 205,920.00 823,680.00
- Ø 200 mm Flange las unit 22.00 412,500.00 9,075,000.00
- Ø 300 mm Flange las unit 2.00 880,000.00 1,760,000.00
- Ø 100 mm Karet Packing unit 4.00 9,680.00 38,720.00
- Ø 150 mm Karet Packing unit 2.00 16,500.00 33,000.00
- Ø 200 mm Karet Packing unit 22.00 25,300.00 556,600.00
- Ø 300 mm Karet Packing unit 4.00 36,850.00 147,400.00
- M16 Baud mur set 32.00 29,458.00 942,656.00
- M20 Baud mur set 288.00 39,768.30 11,453,270.40
- M24 Baud mur set 48.00 44,187.00 2,120,976.00
7 Sarana Prasarana
- Electric Motor Hoist kapasitas 5 Ton Horizontal dan Vertical, l unit 1.00 77,880,000.00 77,880,000.00
- Electric Motor Hoist crane, Kapasitas 2 ton, lengkap dengan span set 1.00 45,424,896.00 45,424,896.00
- Pengadaan dan Pemasangan Extended Stem Valve set 3.00 2,383,562.50 7,150,687.50
- IWF Baja 150 x 300 mm Kg 480.00 - -
- Tangki air vessel Kapasitas L 10 m3, Tekanan 16kg/cm2, dile set 2.00 565,362,336.00 1,130,724,672.00
Jumlah 5,514,916,645.51

c Pengadaan dan Pemasangan Elektrikal dan Accesories


1 Panel workshop (PK-WK)
- Box Panel Unit 1.00 14,214,000.00 14,214,000.00
- Bus Bar 3P+N/205A +PE dan acessories set 1.00 35,535,000.00 35,535,000.00
- MCCB 3P (100-125)A 36 KA + electronic trip set 1.00 3,647,500.00 3,647,500.00
- MCCB 3P (80-100)A 25 KA + electronic trip set 1.00 3,647,394.73 3,647,394.73
- MCB 3P/16A 10A unit 2.00 327,973.39 655,946.78
- MCB 3P/40A 10A unit 2.00 505,427.59 1,010,855.18
- MCB 3P/25A 10A unit 2.00 327,973.39 655,946.78
- MCB 3P/20A 10A unit 2.00 327,973.39 655,946.78
- Volt meter (0-500)V, Uk 72x72 unit 1.00 387,090.00 387,090.00
- VS (Voltage selector switch, 7 posisi) unit 1.00 218,212.50 218,212.50
- Plug dan Socket 2P + E 16A, 220 VAC, Panel mounted, kompli set 1.00 409,605.01 409,605.01
- Plug dan Socket 3P + N + E 16A, 380 VAC, Panel mounted, ko set 1.00 409,605.01 409,605.01
- Grounding, Perakitan dan Pemasangan lengkap termasuk aksesor LS 1.00 57,500.00 57,500.00
2 Panel Penerangan Ruang Kantor (PP-KR)
- Box plastic mini pragma pintu transparant, inbow, 36 modul unit 1.00 780,441.75 780,441.75
- MCB 3P/16A 10 KA unit 1.00 327,973.39 327,973.39
- RCCB/ELCB, 4P, 25A, Sensitifitas : 30 mA unit 1.00 980,751.34 980,751.34
- MCB 1P/6A 6 KA unit 3.00 69,714.15 209,142.45
- MCB 1P/10A 6 KA unit 7.00 69,714.15 487,999.05
- Box plastic mini pragma pintu transparant, inbow, 12 modul unit 1.00 531,300.00 531,300.00
- RCCB/ELCB, 4P, 16A, Sensitifitas : 30 mA unit 1.00 2,270,776.20 2,270,776.20
- MCB 3P, 32 Amp unit 1.00 1,208,707.50 1,208,707.50
- MCB 3P, 16 Amp unit 1.00 1,907,367.00 1,907,367.00
- MCB 1P/4A 6 KA unit 4.00 278,932.50 1,115,730.00
- MCB 1P/6A 6 KA unit 4.00 69,714.15 278,856.60
- MCB 1P/16A 6 KA unit 1.00 345,345.00 345,345.00
- Lampu TL / DL 2 X 18 watt Unit 15.00 112,901.25 1,693,518.75
- Lampu TL / DL 2 X 36 watt Unit 22.00 112,901.25 2,483,827.50
- Exhaust fan 40 watt Unit 2.00 758,696.40 1,517,392.80
- Outlet 10 A/2P+E 220V Unit 16.00 294,871.50 4,717,944.00
- Stop kontak AC Unit 4.00 66,412.50 265,650.00
- Double Switch 10 A/ 220V plano Unit 5.00 39,847.50 199,237.50
- Single switch 10 A/ 220V plano Unit 2.00 32,257.50 64,515.00
- Saklar Hotel Unit 1.00 569,022.30 569,022.30
- Instalasi titik lampu titik 12.00 1,016,111.25 12,193,335.00
- Instalasi stop kontak titik 20.00 677,407.50 13,548,150.00
- Instalasi exhaust fan titik 2.00 677,407.50 1,354,815.00
- Kabel dari Panel P. Lt 1 ke P. Penerangan R. Kimia
- NYFGBY 4 x 10 mm2 meter 45.00 301,778.40 13,580,028.00
- BC 4 mm2 meter 20.00 54,192.60 1,083,852.00
- Box plastic mini pragma pintu transparant, inbow, 12 modul unit 1.00 531,300.00 531,300.00
- RCCB/ELCB, 4P, 16A, Sensitifitas : 30 mA unit 1.00 2,270,776.20 2,270,776.20
- MCB 3P, 16 Amp unit 1.00 1,907,367.00 1,907,367.00
- MCB 1P/4A 6 KA unit 1.00 278,932.50 278,932.50
- MCB 1P/6A 6 KA unit 3.00 69,714.15 209,142.45
- MCB 1P/10A 6 KA unit 1.00 69,714.15 69,714.15
- MCB 1P/16A 6 KA unit 1.00 345,345.00 345,345.00
- Lampu TL / DL 1 X 32 watt Unit 11.00 112,901.25 1,241,913.75
- Exhaust fan 40 watt Unit 3.00 758,696.40 2,276,089.20
- Outlet 10 A/2P+E 220V Unit 11.00 294,871.50 3,243,586.50
- Stop kontak AC Unit 3.00 66,412.50 199,237.50
- Double Switch 10 A/ 220V plano Unit 5.00 39,847.50 199,237.50
- Single switch 10 A/ 220V plano Unit 3.00 32,257.50 96,772.50
- Saklar Hotel Unit 1.00 569,022.30 569,022.30
- Instalasi stop kontak titik 14.00 677,407.50 9,483,705.00
- Instalasi exhaust fan titik 3.00 677,407.50 2,032,222.50
- Kabel dari P. Penerangan Lt 2 ke P. Penerangan Lt. 1
- NYY 4 x 4 mm2 meter 7.00 301,778.40 2,112,448.80
- BC 4 mm2 meter 7.00 54,192.60 379,348.20
- Skun Kabel 10 mm (Cu) set 4.00 398,475.00 1,593,900.00
- Skun Kabel 4 mm (Cu) set 6.00 172,672.50 1,036,035.00
3 Terminal board Grounding (1B-G)
- Box Panel unit 1.00 1,185,937.50 1,185,937.50
- Accessories penunjang termasuk busbar, isolator, supporting, dll LS 1.00 1,713,653.62 1,713,653.62
- Grounding, Perakitan dan Pemasangan lengkap termasuk aksesor LS 1.00 57,500.00 57,500.00
4 Panel Penerangan Lampu Luar Air Bersih (PP-LR3)
- Box Panel outdoor type unit 1.00 464,887.50 464,887.50
- MCB 3P/20A 6 KA unit 2.00 327,973.39 655,946.78
- Contactor, 3P, 32 A AC1, 380 V unit 1.00 684,048.75 684,048.75
- Photo cell unit 1.00 167,185.73 167,185.73
- MCB 1P/10A 6 KA unit 2.00 69,714.15 139,428.30
- Grounding, Perakitan dan Pemasangan lengkap termasuk aksesor LS 1.00 57,500.00 57,500.00
5 Panel penerangan Ruang Pompa Air Bersih (PP-AB)
- Box Plastic mini pragma pintu tranparant, inbow, 12 modul unit 1.00 322,195.50 322,195.50
- MCB 3P/16A 10 KA unit 1.00 327,973.39 327,973.39
- RCCB/ELCB, 4P, 25A, Sensitifitas : 30 mA unit 1.00 980,751.34 980,751.34
- MCB 1P/6A 6 KA unit 6.00 69,714.15 418,284.90
- MCB 1P/10A 6 KA unit 4.00 69,714.15 278,856.60
- Grounding, Perakitan dan Pemasangan lengkap termasuk aksesor LS 1.00 57,500.00 57,500.00
6 Penerangan Ruang Kantor/ Laboratorium/ Ruang Kendali
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 8.00 683,100.00 5,464,800.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 2.00 910,800.00 1,821,600.00
- Lampu Phillips 2 x 36W/220V, waterproof unit 8.00 910,800.00 7,286,400.00
- Single switch 10 A/ 220V plano unit 18.00 32,257.50 580,635.00
- Double Switch 10 A/ 220V plano unit 4.00 39,847.50 159,390.00
- Outlet 10A / 220V unit 10.00 158,826.44 1,588,264.43
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 3.00 437,469.31 1,312,407.92
- Kabel NYM 3 x 2,5 mm2 m 250.00 24,667.50 6,166,875.00
- uPVC Conduit 20 m m 175.00 14,895.38 2,606,690.63
- uPVC Conduit 25 mm m 2.00 30,360.00 60,720.00
- Exhaust fan, Industrial type, wall mounted, 16", komplit base fr set 2.00 1,005,675.00 2,011,350.00
- Air Conditioning, Cooling Capacity 1350W, 1 phase, wall moun set 2.00 9,392,625.00 18,785,250.00
- Grounding, Perakitan dan Pemasangan lengkap termasuk aksesor LS 1.00 57,500.00 57,500.00
7 Penerangan Ruang Pompa Air Bersih
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 8.00 683,100.00 5,464,800.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 8.00 910,800.00 7,286,400.00
- Single switch 10 A/ 220V plano unit 6.00 32,257.50 193,545.00
- Double Switch 10 A/ 220V plano unit 4.00 39,847.50 159,390.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 2.00 437,469.31 874,938.62
- Kabel NYM 3 x 2,5 mm2 m 180.00 24,667.50 4,440,150.00
- uPVC Conduit 20 m m 150.00 14,895.38 2,234,306.25
- uPVC Conduit 25 mm m 2.00 30,360.00 60,720.00
- Exhaust fan, Industrial type, wall mounted, 16", komplit base fr set 2.00 1,005,675.00 2,011,350.00
8 Panel Penerangan Work shop (PP-WS)
- Box Plastic mini pragma pintu tranparant, inbow, 24 modul unit 1.00 513,843.00 513,843.00
- MCB 3P/16A 10 KA unit 1.00 327,973.39 327,973.39
- RCCB/ELCB, 4P, 25A, Sensitifitas : 30 mA unit 1.00 980,751.34 980,751.34
- MCB 1P/6A 6 KA unit 4.00 69,714.15 278,856.60
- MCB 1P/10A 6 KA unit 3.00 69,714.15 209,142.45
- Grounding, Perakitan dan Pemasangan lengkap termasuk aksesor LS 1.00 57,500.00 57,500.00
9 Penerangan Ruang Workshop
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 8.00 683,100.00 5,464,800.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 8.00 910,800.00 7,286,400.00
- Lampu Phillips 18W/220V, Baret type unit 2.00 910,800.00 1,821,600.00
- Mercury 250 watt with industrial cap type high-bay reflector 55 unit 4.00 1,166,962.50 4,667,850.00
- Single switch 10 A/ 220V plano unit 6.00 32,257.50 193,545.00
- Double Switch 10 A/ 220V plano unit 4.00 39,847.50 159,390.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 2.00 437,469.31 874,938.62
- Kabel NYM 3 x 2,5 mm2 m 180.00 24,667.50 4,440,150.00
- uPVC Conduit 20 m m 150.00 14,895.38 2,234,306.25
- uPVC Conduit 25 mm m 2.00 30,360.00 60,720.00
- Exhaust fan, Industrial type, wall mounted, 16", komplit base fr set 2.00 1,005,675.00 2,011,350.00
10 Penangkal Petir Bangunan Workshop, Lab dan Office
- Penangkal Petir type Elctrode dengan Rmin = 60m LS 1.00 18,669,072.00 18,669,072.00
- BC 50 mm2 m 56.00 93,926.25 5,259,870.00
- Clamp BC, 50 mm2 unit 200.00 69,660.72 13,932,143.28
- Air terminal Ø 1, termasuk dudukan, komplit set 8.00 1,184,232.18 9,473,857.43
- GIP Ø 2 termasuk socket set 2.00 1,142,435.76 2,284,871.51
- Grounding rod 3/4 set 2.00 487,625.01 975,250.03
- Pipa PVC Ø 1, termasuk clamp set 2.00 501,557.16 1,003,114.32
- Box control 30x30x70 cm LS 2.00 1,462,875.04 2,925,750.09
- Grounding, Perakitan dan Pemasangan lengkap termasuk aksesor LS 1.00 57,500.00 57,500.00
11 Penangkal Petir Bangunan Pompa Air Bersih
- Penangkal Petir type Elctrode dengan Rmin = 60m LS 1.00 18,669,072.00 18,669,072.00
- BC 50 mm2 m 74.00 93,926.25 6,950,542.50
- Clamp BC, 50 mm2 unit 250.00 69,660.72 17,415,179.10
- Air terminal Ø 1, termasuk dudukan, komplit set 4.00 1,184,232.18 4,736,928.72
- GIP Ø 2 termasuk socket set 4.00 1,142,435.76 4,569,743.03
- Grounding rod 3/4 set 2.00 487,625.01 975,250.03
- Pipa PVC Ø 1, termasuk clamp set 2.00 501,557.16 1,003,114.32
- Box control 30x30x70 cm LS 2.00 1,462,875.04 2,925,750.09
- Grounding, Perakitan dan Pemasangan lengkap termasuk aksesor LS 1.00 57,500.00 57,500.00
12 Panel Pompa Kontrol Back Wash
- Box Plate metal, 2000x800x600 mm, Floor Standing Unit 1.00 21,881,590.50 21,881,590.50
- MCCB 3 POLE, 200 A Unit 1.00 15,846,288.15 15,846,288.15
- Current Transformator 200/5 A Unit 3.00 1,437,432.15 4,312,296.45
- Power Meter Digital Unit 1.00 3,187,800.00 3,187,800.00
- Indicator Lamp R, S, T Unit 7.00 108,916.50 762,415.50
- LAMPU TL 10 watt Unit 1.00 112,901.25 112,901.25
- MINI FUSE 2A Unit 3.00 242,804.10 728,412.30
- Push Bottom Unit 1.00 108,916.50 108,916.50
- Emergency Push Button Unit 1.00 683,517.45 683,517.45
- Buzzer, 70 dBA Unit 1.00 35,103.75 35,103.75
- Plug in relay 220V, 14 pin, 4 kontak C/O, 5 amp, built in pil Unit 6.00 80,643.75 483,862.50
- Illuminated Push Button, 220VAC Unit 8.00 820,858.50 6,566,868.00
- Selector Switch 3 Posisi Unit 4.00 590,008.65 2,360,034.60
- MCCB 3 POLE, 80 A Unit 4.00 3,801,451.50 15,205,806.00
- MCB 3 POLE, 32 A Unit 2.00 1,208,707.50 2,417,415.00
- MCB 3 POLE, 6 A Unit 1.00 2,269,713.60 2,269,713.60
- MCB 3 POLE, 16 A Unit 1.00 2,269,713.60 2,269,713.60
- MCB 2 POLE, 6 A Unit 2.00 1,694,050.05 3,388,100.10
- MCB 1P/4A 6 KA Unit 3.00 278,932.50 836,797.50
- MAGNETIC CONTACTOR LC1-D50 Unit 4.00 6,876,084.60 27,504,338.40
- MAGNETIC CONTACTOR LC1-D40 Unit 2.00 5,777,621.85 11,555,243.70
- MAGNETIC CONTACTOR LC1-D25 Unit 2.00 5,777,621.85 11,555,243.70
- Thermal Overload LR-D340 Unit 2.00 4,845,987.30 9,691,974.60
- Thermal Overload LR-D21 Unit 2.00 1,910,289.15 3,820,578.30
- Power Supply DC 220VAC / 24VDC 10A Unit 1.00 10,372,304.25 10,372,304.25
- Kabel tray 200x 100 Btg 3.00 4,899,648.60 14,698,945.80
- Grounding, Perakitan dan Pemasangan lengkap termasuk aksesor LS 1.00 57,500.00 57,500.00
13 Panel Kontrol Distribusi
- Box Plate metal, 3400x2100x1000 mm, Floor Standing Unit 1.00 21,881,590.50 21,881,590.50
- MCCB 3 POLE, 630 A Unit 1.00 15,846,288.15 15,846,288.15
- Current Transformator 1000/5 A Unit 3.00 1,437,432.15 4,312,296.45
- Power Meter Digital Unit 1.00 3,187,800.00 3,187,800.00
- Indicator Lamp R, S, T Unit 3.00 108,916.50 326,749.50
- LAMPU TL 10 watt Unit 3.00 112,901.25 338,703.75
- MINI FUSE 2A Unit 3.00 242,804.10 728,412.30
- Push Bottom Unit 6.00 108,916.50 653,499.00
- Emergency Push Button Unit 1.00 683,517.45 683,517.45
- Buzzer, 70 dBA Unit 1.00 35,103.75 35,103.75
- Plug in relay 220V, 14 pin, 4 kontak C/O, 5 amp, built in pil Unit 12.00 80,643.75 967,725.00
- Illuminated Push Button, 220VAC Unit 6.00 820,858.50 4,925,151.00
- Selector Switch 3 Posisi Unit 3.00 590,008.65 1,770,025.95
- 3 POLE, 1000 A Unit 1.00 531,300.00 531,300.00
- MCB 3 POLE, 6 A Unit 5.00 2,269,713.60 11,348,568.00
- MCB 3 POLE, 10 A Unit 1.00 2,269,713.60 2,269,713.60
- MAGNETIC CONTACTOR LC1-F500 Unit 4.00 6,876,084.60 27,504,338.40
- Power Supply DC 220VAC / 24VDC 10A Unit 1.00 10,372,304.25 10,372,304.25
- Kabel tray 200x 100 Btg 3.00 4,899,648.60 14,698,945.80
- Grounding, Perakitan dan Pemasangan lengkap termasuk aksesor LS 1.00 57,500.00 57,500.00
14 Panel Meja Kontrol Filter Utama
- Box Plate metal, 1250x1600x1040 mm, FS Meja Unit 1.00 26,565,000.00 26,565,000.00
- MCB 1P/4A 6 KA unit 3.00 278,932.50 836,797.50
- Plug in relay 220V, 14 pin, 4 kontak C/O, 5 amp, built in pil unit 36.00 80,643.75 2,903,175.00
- Plug in relay 220V, 14 pin, 4 kontak C/O, 5 amp, built in pil unit 15.00 80,643.75 1,209,656.25
- Illuminated Push Button, 220VAC unit 36.00 820,858.50 29,550,906.00
- Illuminated Push Button, 220VAC unit 36.00 820,858.50 29,550,906.00
- Selector Switch 3 Posisi unit 7.00 590,008.65 4,130,060.55
- Power Supply DC 220VAC / 24VDC 10A unit 1.00 10,372,304.25 10,372,304.25
- Emergency Switch unit 1.00 683,517.45 683,517.45
- Push Bottom unit 2.00 108,916.50 217,833.00
- Indicator Lamp R, S, T unit 2.00 108,916.50 217,833.00
- Air Regulator unit 1.00 3,793,482.00 3,793,482.00
- Air Pressure Switch unit 1.00 4,293,966.60 4,293,966.60
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 57,500.00 57,500.00
15 Panel Filter ( Selenoid )
- Panel Lokal Filter Outdoor type double door dengan support unit 6.00 9,297,750.00 55,786,500.00
- Selenoid valve + manifold 6 selenoid (by others)
- Plug in relay 220V, 14 pin, 4 kontak C/O, 5 amp, built in pil unit 30.00 80,643.75 2,419,312.50
- Illuminated Push Button Green, 220VAC unit 30.00 820,858.50 24,625,755.00
- Illuminated Push Button Red, 220VAC unit 30.00 820,858.50 24,625,755.00
- Selector Switch 3 Posisi unit 30.00 590,008.65 17,700,259.50
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 57,500.00 57,500.00
16 Panel Kontrol Filter ( kontrol )
- Box Plate metal, 600x500x200 mm, Wall Mounting unit 1.00 7,969,500.00 7,969,500.00
- MCB 3P/6A, 6 KA unit 1.00 2,269,713.60 2,269,713.60
- RCCB/ELCB, 4P, 10A, Sensitifitas : 30 mA unit 1.00 1,604,526.00 1,604,526.00
- MCB 1P/4A 6 KA unit 5.00 278,932.50 1,394,662.50
- MCB 1P/6A 6 KA unit 1.00 69,714.15 69,714.15
- Time Switch 24 Jam unit 1.00 2,276,089.20 2,276,089.20
- Magnetic Contactor 10A unit 1.00 2,400,944.70 2,400,944.70
- Indicator Lamp R, S, T unit 3.00 108,916.50 326,749.50
- Mini Fuse 2A unit 4.00 242,804.10 971,216.40
- Selector Switch 3 Posisi unit 1.00 590,008.65 590,008.65
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 57,500.00 57,500.00
17 Instalasi Penerangan R. Pompa
- Lampu TL 2 X 18 watt unit 12.00 112,901.25 1,354,815.00
- Lampu TL 2 x 36 watt unit 9.00 112,901.25 1,016,111.25
- Outlet 10 A/2P+E 220V unit 1.00 294,871.50 294,871.50
- Stop kontak AC unit 1.00 66,412.50 66,412.50
- Double Switch 10 A/ 220V plano unit 2.00 39,847.50 79,695.00
- Single switch 10 A/ 220V plano unit 2.00 32,257.50 64,515.00
- Instalasi titik lampu titik 21.00 1,016,111.25 21,338,336.25
- Instalasi stop kontak titik 2.00 677,407.50 1,354,815.00
- Kabel dari penerangan Pompa ke Panel Pompa Distribusi
- - NYY 5 x 2,5 mm2 meter 15.00 75,975.90 1,139,638.50
18 Panel Penerangan R. Kontrol dan R. Backwash
- Box plastic mini pragma pintu transparant, inbow, 12 modul unit 1.00 531,300.00 531,300.00
- RCCB/ELCB, 4P, 10A, Sensitifitas : 30 mA unit 1.00 1,604,526.00 1,604,526.00
- MCB 3P, 10 Amp unit 1.00 2,269,713.60 2,269,713.60
- MCB 1P/4A 6 KA unit 5.00 278,932.50 1,394,662.50
- MCB 1P/6A 6 KA unit 1.00 69,714.15 69,714.15
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 57,500.00 57,500.00
19 Instalasi Penerangan R. Kontrol dan R. Backwash
- Lampu TL 2 X 18 watt unit 6.00 112,901.25 677,407.50
- Outlet 10 A/2P+E 220V unit 5.00 294,871.50 1,474,357.50
- Stop kontak 3P 6 Amp (pug & soket) unit 1.00 1,142,029.35 1,142,029.35
- Stop kontak AC unit 2.00 66,412.50 132,825.00
- Double Switch 10 A/ 220V plano unit 2.00 39,847.50 79,695.00
- Single switch 10 A/ 220V plano unit 5.00 32,257.50 161,287.50
- Instalasi titik lampu titik 6.00 1,016,111.25 6,096,667.50
- Instalasi stop kontak titik 8.00 677,407.50 5,419,260.00
- Kabel dari P. Penerangan R. Kontrol ke Panel Backwash
- - NYY 5 x 2,5 mm2 meter 20.00 75,975.90 1,519,518.00
Jumlah 980,924,667.00

- PEKERJAAN MEKANIKAL DAN ELEKTRIKAL LUAR BANGUNAN 7,439,500,216.87


a Pengadaan kabel-kabel
1 Biaya Penyambungan Baru Pelanggan TM 1385 KVA
- BP + UJL Unit 1.00 309,068,250.00 309,068,250.00
- Jasa Pengurusan SLO Ls 396,750.00 50.00 19,837,500.00
2 Kabel dari PLN ke Panel TM, Primer Trafo, Sekunder Trafo, Genset, MDP ke masing - masing panel (Air Baku, Air bersih, Blower, Dosing, Panel Penerangan, Genset )
- Dari meter PLN ke Panel TM (cubicle)
- Kabel XLPE 1 x 70 mm2 12/20/kV m 75.00 182,160.00 13,662,000.00
- Terminating kabel XLPE, 70 mm2 set 6.00 5,088,261.02 30,529,566.14
- Dari meter Panel TM (cubicle) ke primer trafo
- Kabel XLPE 1 x 70 mm2 12/20/kV m 30.00 182,160.00 5,464,800.00
- Terminating kabel XLPE, 70 mm2 set 6.00 5,088,261.02 30,529,566.14
- Dari Sekunder trafo ke Panel MDP
- Kabel NYY 1 x 240 mm2 m 80.00 437,713.00 35,017,040.00
- Dari Generator 2x625 kVA ke Panel MDP
- Kabel NYY 1 x 240 mm2 m 120.00 437,713.00 52,525,560.00
- Kabel NYY 1 x 240 mm2 m 40.00 437,713.00 17,508,520.00
- Kabel NYA 1 x 120 mm2 m 30.00 104,500.00 3,135,000.00
- Dari Panel MDP ke panel M-PK (Pompa Doosing Kimia)
- Kabel NYFGbY 4 x 16 mm2 m 183.00 123,337.50 22,570,762.50
- Kabel NYA 1 x 16 mm2 m 183.00 24,667.50 4,514,152.50
- Dari Panel MDP ke Panel M-FL (Filter)
- Kabel NYFGbY 4 x 35 mm2 m 102.00 237,187.50 24,193,125.00
- Kabel NYA 1 x 25 mm2 m 102.00 39,847.50 4,064,445.00
- Kabel NYFGbY 4 x 95 mm2 m 85.00 578,737.50 49,192,687.50
- Kabel NYA 1 x 70 mm2 m 85.00 102,465.00 8,709,525.00
- Dari Panel MDP ke panel DP - WS (Workshop)
- Kabel NYFGbY 4 x 35 mm2 m 183.00 237,187.50 43,405,312.50
- Kabel NYA 1 x 25 mm2 m 183.00 39,847.50 7,292,092.50
- Dari Panel MDP ke panel PC-AB (Air Bersih)
- Kabel NYFGbY 4 x 300 mm2 m 30.00 1,774,162.50 53,224,875.00
- Kabel NYA 1 x 120 mm2 m 30.00 180,262.50 5,407,875.00
- Dari Panel MDP ke panel PC-ABK (Air Baku)
- Kabel NYFGbY 4 x 300 mm2 m 80.00 1,774,162.50 141,933,000.00
- Kabel NYA 1 x 120 mm2 m 80.00 180,262.50 14,421,000.00
- Kabel NYFGbY 4 x 95 mm2 m 80.00 578,737.50 46,299,000.00
- Kabel NYA 1 x 70 mm2 m 80.00 102,465.00 8,197,200.00
- Dari MDP ke Panel TB-G (terminal Box Grounding)
- Kabel NYA 1 x 120 mm2 m 9.00 180,262.50 1,622,362.50
- Dari panel TB-G ke box control
- Kabel NYA 1 x 120 mm2 m 24.00 180,262.50 4,326,300.00
- Acessories
- GIP 1 " m 4.00 110,342.57 441,370.26
- GIP 2" m 20.00 212,520.00 4,250,400.00
- GIP 3" m 8.00 313,467.00 2,507,736.00
- GIP 4" m 16.00 485,076.90 7,761,230.40
3 Kabel daya ke sub panel / panel penerangan
- Dari Panel MDP ke panel PP-RL
- Kabel NYY 4 x 4 mm2 m 7.00 67,914.00 475,398.00
- Kabel NYA 1 x 6 mm2 m 7.00 42,966.00 300,762.00
- uPVC Conduit 25 mm m 2.00 18,480.00 36,960.00
- Dari Panel M-PK ke panel PP-RJ (PP Ruang Jaga)
- Kabel NYFGbY 3 x 4 mm2 m 40.00 61,561.50 2,462,460.00
- GIP 1 " m 3.00 67,165.04 201,495.12
- uPVC Conduit 25 mm m 2.00 18,480.00 36,960.00
- Dari Panel M-PK ke panel PP-RK
- Kabel NYY 4 x 4 mm2 m 25.00 67,914.00 1,697,850.00
- Kabel NYA 1 x 6 mm2 m 25.00 42,966.00 1,074,150.00
- GIP 1 " m 2.00 100,429.04 200,858.08
- uPVC Conduit 25 mm m 2.00 51,744.00 103,488.00
- Dari Panel M-PK ke panel PP-KR
- Kabel NYY 4 x 6 mm2 m 20.00 81,774.00 1,635,480.00
- Kabel NYA 1 x 6 mm2 m 20.00 42,966.00 859,320.00
- GIP 1 " m 2.00 67,165.04 134,330.08
- uPVC Conduit 25 mm m 2.00 18,480.00 36,960.00
- Dari Panel PC-ABK ke panel PP-ABK
- Kabel NYY 4 x 4 mm2 m 7.00 67,914.00 475,398.00
- Kabel NYA 1 x 6 mm2 m 7.00 42,966.00 300,762.00
- uPVC Conduit 25 mm m 2.00 18,480.00 36,960.00
- Dari Panel F-FL ke panel PP - RL2
- Kabel NYY 4 x 6 mm2 m 7.00 81,774.00 572,418.00
- Kabel NYA 1 x 6 mm2 m 7.00 42,966.00 300,762.00
- Dari Panel M-FL ke panel PP-FL
- Kabel NYY 4 x 6 mm2 m 7.00 81,774.00 572,418.00
- Kabel NYA 1 x 6 mm2 m 7.00 42,966.00 300,762.00
- GIP 1 " m 2.00 67,165.04 134,330.08
- Dari Panel M-FL ke Panel PC-BWR
- Kabel NYY 4 x 4 mm2 m 150.00 67,914.00 10,187,100.00
- Kabel NYA 1 x 6 mm2 m 40.00 42,966.00 1,718,640.00
- Dari panel M-FL ke panel MOBV filter
- Kabel NYY 4 x 2.5 mm2 m 150.00 56,364.00 8,454,600.00
- Dari Panel M-FL ke panel PC-BWR
- Kabel NYFGbY 4 x 25 mm2 m 80.00 142,989.00 11,439,120.00
- Kabel NYA 1 x 25 mm2 m 80.00 57,519.00 4,601,520.00
- GIP 2" m 8.00 129,360.00 1,034,880.00
- Dari Panel PC-BWR ke panel PP-BWR
- Kabel NYY 3x4 mm2 m 7.00 59,829.00 418,803.00
- Kabel NYA 1 x 6 mm2 m 7.00 42,966.00 300,762.00
- uPVC Conduit 25 mm m 2.00 18,480.00 36,960.00
- Dari Panel PC-BW ke panel PP-BW
- Kabel NYY 4 x 4 mm2 m 7.00 67,914.00 475,398.00
- Kabel NYA 1 x 6 mm2 m 7.00 42,966.00 300,762.00
- uPVC Conduit 25 mm m 2.00 18,480.00 36,960.00
- Dari Panel PC-AB ke panel PP-LR3
- Kabel NYFGbY 4 x 6 mm2 m 15.00 74,844.00 1,122,660.00
- Kabel NYA 1 x 6 mm2 m 15.00 42,966.00 644,490.00
- Dari panel PP - LR3 ke panel PP-PJ
- Kabel NYY 4 x 4 mm2 m 7.00 67,914.00 475,398.00
- uPVC Conduit 25 mm m 2.00 18,480.00 36,960.00
- Dari Panel PC-AB ke panel PP-AB
- Kabel NYY 4 x 4 mm2 m 7.00 67,914.00 475,398.00
- Kabel NYA 1 x 6 mm2 m 7.00 42,966.00 300,762.00
- uPVC Conduit 25 mm m 2.00 18,480.00 36,960.00
- Dari Panel PC-ABK ke panel PP-LR1
- Kabel NYFGbY 4 x 6 mm2 m 15.00 74,844.00 1,122,660.00
- Kabel NYA 1 x 6 mm2 m 15.00 42,966.00 644,490.00
3 Kabel daya dan kontrol dari masing - masing panel kontrol ke masing - masing motor, ukuran kabel sesuai dengan spesifikasi masing - masing motor
- Dari Panel PC -AB ke terminal motor, pompa Air Bersih
- Kabel NYY 3 x 70 mm2 m 120.00 322,575.00 38,709,000.00
- Kabel NYA 1 x 70 mm2 m 60.00 102,465.00 6,147,900.00
- Dari Panel PC -AB ke terminal motor, pompa backwash
- Kabel NYY 3 x 6 mm2 m 72.00 60,720.00 4,371,840.00
- Kabel NYA 1 x 6 mm2 m 36.00 15,939.00 573,804.00
- Dari Panel PC -ABK ke terminal motor, pompa air baku
- Kabel NYY 3 x 35 mm2 m 80.00 180,262.50 14,421,000.00
- Kabel NYA 1 x 35 mm2 m 20.00 53,130.00 1,062,600.00
- Dari Panel PC -ABK ke terminal motor blower
- Kabel NYY 3 x 6 mm2 m 40.00 60,720.00 2,428,800.00
- Kabel NYA 1 x 6 mm2 m 20.00 15,939.00 318,780.00
- Dari Panel PC -ABK ke terminal motor air compressor
- Kabel NYY 3 x 6 mm2 m 100.00 60,720.00 6,072,000.00
- Kabel NYA 1 x 6 mm2 m 12.00 15,939.00 191,268.00
- Dari Panel PC -ABK ke terminal motor mixer/pompa dosing/blower
- Kabel NYY 4 x 2.5 mm2 m 100.00 37,950.00 3,795,000.00
- Dari Panel PC -ABK ke local control panel (LCP-MX/BW/AL/SA)
- Kabel NYY 3 x 2.5 mm2 m 80.00 28,462.50 2,277,000.00
- Dari Panel PC -ABK ke masing-masing pneumatice valve
- Kabel NYY 3 x 2.5 mm2 m 600.00 28,462.50 17,077,500.00
- Dari Panel M-FL ke masing-masing pneumatice valve sludge drain
- Kabel NYY 3 x 2.5 mm2 m 100.00 28,462.50 2,846,250.00
- Dari Panel PC-ABK ke LCP-ABK 1/2/3
- Kabel NYY 3 x 2.5 mm2 m 66.00 28,462.50 1,878,525.00
- Acessories
- Supporting kabel/rak LS 1.00 13,792,821.85 13,792,821.85
4 Kabel dari Panel Dosing ke peralatan
- Kabel dari Panel Dosing ke LVMDP
- NYFGBY 4 x 70 mm2 meter 150.00 584,430.00 87,664,500.00
- BC 35 mm2 meter 30.00 157,264.80 4,717,944.00
- Kabel dari Panel Dosing ke Dosing pumps
- NYY 4 x 2.5 mm2 meter 95.00 35,756.89 3,396,904.50
- NYYHY 3 x 1,5 mm2 meter 110.00 39,050.55 4,295,560.50
- Kabel dari Panel Dosing ke Mixer
- NYY 4 x 2,5 mm2 meter 110.00 90,321.00 9,935,310.00
- NYYHY 3 x 1,5 mm2 meter 110.00 39,050.55 4,295,560.50
- Kabel tray 30 x 40 Btg 1.00 4,803,217.65 4,803,217.65
5 Pekerjaan kabel ( Ruang Genset )
- Kabel dari Cubicle PLN ke Cubicle User
- XLPE 3 x (1 x 70mm2) meter 20.00 786,324.00 15,726,480.00
- Kabel dari LVMDP ke Genset
- NYFGBY 4 x (4 x 300 mm2) meter 15.00 18,595,500.00 278,932,500.00
- Kabel dari Cubicle ke travo
- XLPE 3 x (1 x 70mm2) meter 10.00 786,324.00 7,863,240.00
- Kabel dari Travo ke LVMDP
- NYY 3 x (4 x 1 x 500 mm2) meter 15.00 6,101,593.91 91,523,908.65
- NYY 1 x (2 x 1 x 500 mm2) meter 15.00 4,601,058.00 69,015,870.00
6 Instalasi Pentanahan
- Grounding untuk Cubicle Netral PLN
- BC 35 mm2 meter 20.00 157,264.80 3,145,296.00
- Grounding rod 3/4 batang 4.00 3,910,368.00 15,641,472.00
- Grounding untuk Spare
- BC 35 mm2 meter 17.00 157,264.80 2,673,501.60
- Grounding rod 3/4 batang 4.00 3,910,368.00 15,641,472.00
- Grouding Netral Genset
- BC 35 mm2 meter 27.00 157,264.80 4,246,149.60
- Grounding rod 3/4 batang 4.00 3,910,368.00 15,641,472.00
- Grounding Netral Travo
- BC 35 mm2 meter 31.00 157,264.80 4,875,208.80
- Grounding rod 3/4 batang 4.00 3,910,368.00 15,641,472.00
- Grouding Panel (JB)
- BC 2 x 120 mm2 meter 51.00 1,049,848.80 53,542,288.80
- Grounding rod 3/4 batang 4.00 3,910,368.00 15,641,472.00
- Junction Box Grounding ke Genset, Travo
- BC 35 mm2 meter 30.00 157,264.80 4,717,944.00
- Grounding rod 3/4 batang 4.00 3,910,368.00 15,641,472.00
- Junction Box Grounding ke LVMDP
- BC 120 mm2 meter 20.00 524,924.40 10,498,488.00
- Grounding rod 3/4 batang 4.00 3,910,368.00 15,641,472.00
- Junction Box Grounding unit 1.00 4,450,965.75 4,450,965.75
7 Pekerjaan kabel-kabel di IPA
- Kabel dari Panel Distribusi ke Pompa Distribusi
- NYY 3 x (1 x 300mm2) meter 70.00 3,769,573.50 263,870,145.00
- BC 120 mm2 meter 70.00 524,924.40 36,744,708.00
- Kabel dari Panel Distribusi ke LVMDP
- NYFGBY 4 x 300 mm2 meter - 1,774,162.50 -
- BC 120 mm2 meter 20.00 524,924.40 10,498,488.00
- Kabel dari Panel Distribusi ke Hoist
- NYY 4 x 2,5 mm2 meter 10.00 90,321.00 903,210.00
Junction box untuk hoist unit 1.00 2,276,089.20 2,276,089.20
- Kabel dari Panel backwash ke LVMDP
-NYFGBY 4 x 95 mm meter 200.00 1,856,893.50 371,378,700.00
-NYFGBY 4 x 1.5 mm meter 10.00 269,369.10 2,693,691.00
- BC 35 mm2 meter - 157,264.80 -
- Kabel dari Panel Backwash ke Hoist
- NYY 4 x 2,5 mm2 meter 1.00 90,321.00 90,321.00
Junction box untuk hoist unit 1.00 2,276,089.20 2,276,089.20
- Kabel dari Panel Meja ke Panel Lokal Filter 1
- NYYHY 6 x (4 x 1,5mm2) meter 50.00 269,369.10 13,468,455.00
- Kabel dari Panel Meja ke Panel Lokal Filter 2
- NYYHY 6 x (4 x 1,5mm2) meter 45.00 269,369.10 12,121,609.50
- Kabel dari Panel Meja ke Panel Lokal Filter 3
- NYYHY 6 x (4 x 1,5mm2) meter 45.00 269,369.10 12,121,609.50
- Kabel dari Panel Meja ke Panel Lokal Filter 4
- NYYHY 6 x (4 x 1,5mm2) meter 40.00 269,369.10 10,774,764.00
- Kabel dari Panel Meja ke Panel Lokal Filter 5
- NYYHY 6 x (4 x 1,5mm2) meter 40.00 269,369.10 10,774,764.00
- Kabel dari Panel Meja ke Panel Lokal Filter 6
- NYYHY 6 x (4 x 1,5mm2) meter 35.00 269,369.10 9,427,918.50
Pipa GIP 3 x 3 inch meter 25.00 663,859.35 16,596,483.75
- Kabel dari Panel Lokal Filter 1 ke Limit switch Pneumatic Valve
- NYYHY 3 x 1,5 mm2 meter 50.00 39,050.55 1,952,527.50
- Kabel dari Panel Lokal Filter 2 ke Limit switch Pneumatic Valve
- NYYHY 3 x 1,5 mm2 meter 45.00 39,050.55 1,757,274.75
- Kabel dari Panel Lokal Filter 3 ke Limit switch Pneumatic Valve
- NYYHY 3 x 1,5 mm2 meter 40.00 39,050.55 1,562,022.00
- Kabel dari Panel Lokal Filter 4 ke Limit switch Pneumatic Valve
- NYYHY 3 x 1,5 mm2 meter 35.00 39,050.55 1,366,769.25
- Kabel dari Panel Lokal Filter 5 ke Limit switch Pneumatic Valve
- NYYHY 3 x 1,5 mm2 meter 33.00 39,050.55 1,288,668.15
- Kabel dari Panel Lokal Filter 6 ke Limit switch Pneumatic Valve
- NYYHY 3 x 1,5 mm2 meter 25.00 39,050.55 976,263.75
Jumlah 2,708,123,620.56

c Pengadaan Lampu Penerangan Luar


1 Dari panel PP-LR1
- Lampu LED 56W with aluminium housing, termasuk MCB dan tr set 17.00 7,331,940.00 124,642,980.00
- Tiang lampu hot dip galvanis 6 m set 17.00 6,546,375.00 111,288,375.00
- Kabel NYFGbY 3 x 4 mm2 m 15.00 80,193.09 1,202,896.41
- Kabel NYFGbY 3 x 2,5 mm2 m 185.00 55,644.19 10,294,174.69
- Kabel NYFGbY 2 x 2,5 mm2 m 100.00 47,461.22 4,746,121.88
- GIP 2" m 6.00 366,597.00 2,199,582.00
2 Dari panel PP-LR2
- Lampu LED 56W with aluminium housing, termasuk MCB dan tr set 17.00 7,331,940.00 124,642,980.00
- Tiang lampu hot dip galvanis 6 m set 17.00 6,546,375.00 111,288,375.00
- Kabel NYFGbY 4 x 4 mm2 m 30.00 94,922.44 2,847,673.13
- Kabel NYFGbY 3 x 4 mm2 m 50.00 80,193.09 4,009,654.69
- Kabel NYFGbY 3 x 2,5 mm2 m 50.00 55,644.19 2,782,209.38
- Kabel NYFGbY 4 x 2,5 mm2 m 60.00 65,463.75 3,927,825.00
- Kabel NYFGbY 2 x 2,5 mm2 m 40.00 47,461.22 1,898,448.75
3 Dari panel PP-LR3
- Lampu LED 56W with aluminium housing, termasuk MCB dan tr set 17.00 7,331,940.00 124,642,980.00
- Kabel NYFGbY 3 x 2,5 mm2 m 150.00 55,644.19 8,346,628.13
- Kabel NYFGbY 4 x 4 mm2 m 50.00 94,922.44 4,746,121.88
- Kabel NYFGbY 2 x 2,5 mm2 m 220.00 47,461.22 10,441,468.13
- 5. GIP 2" m 6.00 366,597.00 2,199,582.00
Jumlah 656,148,076.03
e Pekerjaan Grounding Sistem, Listrik PLN, Uji Komisioning Sistem Elektrikal
1 Pengadaan dan pemasangan grounding system
Grounding system di seluruh IPA, komplit dengan box kontrol
- sesuai gambar termasuk grounding peralatan, electronic dan LS 1.00 10,031,143.16 10,031,143.16
instrumentasi
2 Penyambungan Listrik PLN
- Uji Komisioning Sistem Elektrikal LS 1.00 397,969,000.00 397,969,000.00
Jumlah 408,000,143.16

4 Pengadaan dan Pemasangan Instrumentasi dan Sistem Otomasi


1 IPA dan Pembubuh Kimia

Water level Sensor, Type Ultrasonik, Akurasi 0.2 % dari


- Range ukuran, Output 4 - 20 mA, support output to scada unit 6.00 21,787,590.00 130,725,540.00
system, instalasi to marshasling panel (backwash)

Chlorine Analyzer Free Reagent, output 4 - 20mA, support


- output to scada system, instalasi to marshasling panel unit 1.00 45,116,060.00 45,116,060.00
(backwash)

Residual Chlorine Analyzer, support output to scada system,


- instalasi to marshasling panel ( backwahs ) bisa di aplikasikan unit 1.00 283,283,990.00 283,283,990.00
di semua area pengolahan air

8 Core Singlemode Outdoor Direct Buried, Double Jacket


- m 250.00 17,325.00
9/125um 4,331,250.00
- Fibre optic splitter set 12.00 687,500.00 8,250,000.00

- Patchcord Duplex Singlemode 9um/125um, 3 meter (LSZH) set 12.00 165,000.00 1,980,000.00

- Network cable UTP Cat5 m 80.00 10,802.36 864,189.04


- Pigtail ST Singlemode, 1 meter set 10.00 18,150.00 181,500.00

- 8-port 10/100/1000 Managed Gigabit Switch with WebView set 4.00 3,888,500.00 15,554,000.00

- Cable tray 200x50x2400x1.2mm dan penutup set 80.00 290,950.00 23,276,000.00


2 Reservoir IPA

Elektromagnetik Flowmeter dengan Akurasi 0.35 % dari


pembacaan, Output 4 - 20 mA, Bahasa komunikasi Hartcomm,
- unit 3.00 41,150,560.00 123,451,680.00
Bahan Lining PFA, DN 300 with display, flange type, support
output to scada system, instalasi to marshasling panel

Turbidity Analyzer Output 4 - 20 mA, Bahasa komunikasi


- Hartcomm, 0-10000 ntu, support output to scada system, unit 1.00 92,883,340.00 92,883,340.00
instalasi to marshasling panel

Digital pH Meter, Output 4 - 20 mA, Bahasa komunikasi


- Hartcomm, support output to scada system, instalasi to unit 1.00 17,108,300.00 17,108,300.00
marshasling panel

Pressure Transmitter dengan Akurasi 0.065 % dari span,


- Output 4 - 20 mA, Bahasa komunikasi Hartcomm, support unit 1.00 9,109,320.00 9,109,320.00
output to scada system, instalasi to marshasling panel

Water level Sensor, Tipe Ultrasonic, Akurasi 0.2 % dari Range


- ukur, Output 4 - 20 mA, support output to scada system, unit 2.00 20,903,850.00 41,807,700.00
instalasi to marshasling panel

Chlorine Analyzer Free Reagent, output 4 - 20mA, support


- output to scada system, instalasi to marshasling panel unit 1.00 45,116,060.00 45,116,060.00
(backwash)

Residual Chlorine Analyzer, support output to scada system,


- instalasi to marshasling panel ( backwahs ) bisa di aplikasikan unit 1.00 45,116,060.00 45,116,060.00
di semua area pengolahan air

8 Core Singlemode Outdoor Direct Buried, Double Jacket


- m 250.00 17,325.00 4,331,250.00
9/125um

- Fibre optic splitter set 12.00 687,500.00 8,250,000.00

- Patchcord Duplex Singlemode 9um/125um, 3 meter (LSZH) set 12.00 165,000.00 1,980,000.00
- Network cable UTP Cat5 m 80.00 10,802.36 864,189.04
- Pigtail ST Singlemode, 1 meter set 10.00 18,150.00 181,500.00

- 8-port 10/100/1000 Managed Gigabit Switch with WebView set 4.00 3,888,500.00 15,554,000.00

- Cable tray 200x50x2400x1.2mm dan penutup set 80.00 290,950.00 23,276,000.00


3 Reservoir Distribusi
- Elektromagnetik Flowmeter dengan Akurasi 0.35 % dari pembacaa unit 3.00 41,150,560.00 123,451,680.00
- Turbidity Analyzer Output 4 - 20 mA, Bahasa komunikasi Hartcom unit 1.00 92,883,340.00 92,883,340.00
- Digital pH Meter, Output 4 - 20 mA, Bahasa komunikasi Hartcomm unit 1.00 17,108,300.00 17,108,300.00
- Pressure Transmitter dengan Akurasi 0.065 % dari span, Output unit 1.00 9,109,320.00 9,109,320.00
- Water level Sensor, Tipe Ultrasonic, Akurasi 0.2 % dari Range u unit 2.00 20,903,850.00 41,807,700.00
- Chlorine Analyzer Free Reagent, output 4 - 20mA, support output unit 1.00 45,116,060.00 45,116,060.00
- Residual Chlorine Analyzer, support output to scada system, inst unit 1.00 45,116,060.00 45,116,060.00
- GSM GPRS Communication Module and Interface, Quad Band, H unit 2.00 6,270,000.00 12,540,000.00
- 8 Core Singlemode Outdoor Direct Buried, Double Jacket 9/12 m 250.00 17,325.00 4,331,250.00
- Fibre optic splitter set 12.00 687,500.00 8,250,000.00
- Patchcord Duplex Singlemode 9um/125um, 3 meter (LSZH) set 12.00 165,000.00 1,980,000.00
- Network cable UTP Cat5 m 80.00 10,802.36 864,189.04
- Pigtail ST Singlemode, 1 meter set 10.00 18,150.00 181,500.00
- 8-port 10/100/1000 Managed Gigabit Switch with WebView set 4.00 3,888,500.00 15,554,000.00
- Cable tray 200x50x2400x1.2mm dan penutup set 80.00 290,950.00 23,276,000.00
- Elektromagnetik Flowmeter dengan Akurasi 0.35 % dari pembacaa unit 1.00 510,400,000.00 510,400,000.00
4 Sistem Otomasi
Hardware support Redundancy system, meliputi Base Modul,
AI/AO, DI/DO sesuai system konfigurasi dan I/O, Server,
- set 1.00 553,810,400.00 553,810,400.00
Workstation, Comm Modem, Printer, Panel and Marshalling
cabinet dan accessories

Stardom Software media, HMI software and other support


- set 1.00 363,466,400.00 363,466,400.00
software, Auto Backup
Engineering dan Generation for FCX function, MMI Display
- and MMI Operator Utility Function (Estimate graphi Panel 10 set 1.00 228,866,000.00 228,866,000.00
pages)
- Pemasangan dan supporting material set 1.00 171,058,250.00 171,058,250.00
FAT, SAT, Uji komisioning Sistem Otomasi, gambar, buku
- set 1.00 455,466,000.00 455,466,000.00
manual OP, pelatihan operator
Jumlah 3,667,228,377.12

XIII PEKERJAAN PERALATAN KANTOR, LAB DAN WORKSHOP 285,194,705.40


1 Pengadaan AC dan APAR
- Air Condition Unit 2 PK Ruang Kendali Operasional unit 4.00 13,783,743.60 55,134,974.40
- Air Condition Unit 1 PK R. Kepala Kantor unit 1.00 6,831,303.60 6,831,303.60
- Air Condition Unit 1.5 PK unit 1.00 7,848,363.60 7,848,363.60
- Fire Extinguisher 6 kg (APAR) tipe ABC Chemical Dry atau Mu unit 3.00 6,579,315.60 19,737,946.80
- Fire Extinguisher 3 kg (APAR) tipe ABC Chemical Dry atau Mu unit 1.00 4,375,179.60 4,375,179.60
- Air Condition Unit 1 PK ex. Daikin u/ R.Staf unit 1.00 6,831,303.60 6,831,303.60
- Air Condition Unit 2 PK ex. Daikin u/ R.Lobby unit 1.00 13,783,743.60 13,783,743.60
- Air Condition Unit 3/4 PK ex. Daikin Class unit 2.00 6,482,163.60 12,964,327.20
Jumlah 127,507,142.40

3 Pengadaan dan Pemasangan Peralatan Laboratorium IPA


- PH Meter Printer unit 2.00 734,712.00 1,469,424.00
- Jar Test 6 Spindel dengan lampu tabung unit 2.00 3,673,560.00 7,347,120.00
- Spektrofotometer UV-VIS unit 1.00 2,755,170.00 2,755,170.00
- Timbangan Analitik (0,001) unit 1.00 3,122,526.00 3,122,526.00
- Konduktometer unit 1.00 1,469,424.00 1,469,424.00
- Pipet Tetes unit 5.00 367,356.00 1,836,780.00
- Beaker Glass unit 5.00 734,712.00 3,673,560.00
- Beaker Glass unit 10.00 1,102,068.00 11,020,680.00
- Gelas Ukur unit 3.00 367,356.00 1,102,068.00
- Tabung Reaksi unit 12.00 3,673,560.00 44,082,720.00
- Rak Tabung Reaksi unit 2.00 1,836,780.00 3,673,560.00
- Erlenmeyer unit 4.00 2,204,136.00 8,816,544.00
- Erlenmeyer unit 4.00 4,408,272.00 17,633,088.00
- Erlenmeyer unit 5.00 7,714,476.00 38,572,380.00
- Spatula unit 2.00 3,673,560.00 7,347,120.00
- Jas Laboratorium set 4.00 367,356.00 1,469,424.00
- Corong Imhof + rak isi 4 buah set 1.00 275,517.00 275,517.00
- Pipet Volume + karet penghisap set 4.00 413,275.50 1,653,102.00
- Stop watch unit 2.00 183,678.00 367,356.00
Jumlah 157,687,563.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6

PEKERJAAN IPA KAPASITAS 165 LT/DT (SIPIL)

1,000,000.00
A PEKERJAAN PERSIAPAN DAN UMUM
I Persiapan dan Pekerjaan Sementara

Mobilisasi semua alat berat, mesin - mesin, peralatan dan tenaga


1 1 Unit - -
ahli yang diperlukan untuk pelaksanaan pekerjaan

Bangunan kantor kontraktor, workshop, gudang, tempat tinggal staf


dan tenaga kerja, serta fasilitas/bangunan lainnya termasuk
2 1 Unit - -
furniture, penerangan, AC dan tempat parkir yang diperlukan untuk
pelaksanaan pekerjaan.

3 Papan nama proyek 1 bh 1,000,000.00 1,000,000.00

4 Pengendalian lalu-lintas pada jalan umum, keamanan dan 1 Unit - -


manajemen lapangan

II Survey dan penyelidikan bawah tanah


1 Test pit ttk 10.00 - -
2 Penyediaan lokasi pembuangan hasil galian ls 1.00 - -

3 Pembersihan semua fasilitas sementara, Pemindahan ls 1.00 - -


mesin/peralatan, material sisa dan sebagainya
JUMLAH
1,000,000.00

B PEKERJAAN BANGUNAN SIPIL


- PEKERJAAN BANGUNAN IPA KAPASITAS 165 LT/DT #REF!
1 PEKERJAAN TANAH
1 Pengukuran dan Pasang Bowplank m' 132.70 - -
2 Galian Tanah dengan Excavator m3 389.56 - -
3 Urugan Pasir m3 69.11 - -
Jumlah -

2 PEKERJAAN STRUKTUR ATAU SIPIL DAN ASITEKTUR


a Pekerjaan Pasangan dan Beton
1 Pekerjaan Pasangan Batu Kosong m3 4.45 - -
2 Pekerjaan Pasangan Batu Kali Campuran 1 : 4 m3 7.71 - -
3 Lantai Kerja K 125 ( 1 pc : 3 ps : 5 Kr) m3 30.96 - -
4 Pekerjaan Beton Bor Pile
- Galian Tanah dengan Bor Ø 40 mm m' 200.00 #REF! #REF!
- Beton K 300 m3 24.50 - -
- Pembesian kg 3,743.16 - -
5 Pekerjaan Beton Pondasi Plat Kaki
- Beton K 300 m3 2.98 - -
- Pembesian kg 2,070.56 - -
- Begesting Batako m2 11.70 - -
6 Pekerjaan Beton Sloop
- Beton K 300 m3 6.18 - -
- Pembesian kg 848.18 - -
- Begesting 2x Pakai m2 41.20 - -
7 Pekerjaan Beton Standing Colum
- Beton K 300 m3 3.68 - -
- Pembesian kg 839.09 - -
- Begesting 2x Pakai m2 21.00 - -
8 Pekerjaan Beton Lantai
- Beton K 300 m3 287.93 - -
- Pembesian kg 55,829.00 - -
9 Pekerjaan Beton Dinding, Gutter, dan Plat Jalan Setapak
- Beton K 300 m3 839.30 - -
- Pembesian kg 100,032.99 - -
- Begesting 2x Pakai m2 4,883.65 - -
- Tie Rot m' 1,306.00 68,500.00 89,461,000.00
- Water Sttop W 300 mm m' 1,801.67 - -
10 Pekerjaan Beton Balok
- Beton K 300 m3 42.47 - -
- Pembesian kg 7,022.79 - -
- Begesting 2x Pakai m2 406.25 - -
11 Pekerjaan Beton Colum
- Beton K 300 m3 76.27 - -
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Pembesian kg 22,358.04 - -
- Begesting 2x Pakai m2 996.58 - -
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
12 Pekerjaan Beton Plat Atap
- Beton K 300 m3 55.76 - -
- Pembesian kg 10,895.18 - -
- Begesting 1x Pakai m2 361.57 - -
13 Pekerjaan Beton Plat Nozel
- Beton K 300 m3 14.51 - -
- Pembesian kg 3,861.37 - -
- Begesting 1x Pakai m2 96.72 - -
14 Pekerjaan Beton Tangga
- Beton K 300 m3 7.69 - -
- Pembesian kg 2,243.89 - -
- Begesting 1x Pakai m2 59.66 - -
- Begesting Batako m2 3.72 - -
15 Pekerjaan Beton Saluran
- Beton K 300 m3 75.94 - -
- Pembesian kg 6,969.96 - -
- Begesting 1x Pakai m2 669.06 - -
16 Pekerjaan Dudukan Pipa dan Pompa
- Beton K 300 m3 0.39 - -
- Pembesian kg 182.44 - -
- Begesting 2x Pakai m2 4.68 - -
17 Pekerjaan Pasangan Bata 1 : 4 m2 271.51 - -
18 Pekerjaan Plesteran m2 554.56 - -
19 Pek. Acian m2 1,158.07 - -

Jumlah #REF!

b Pekerjaan Rangka Baja dan Atap


1 Pekerjaan Rangka Atap Baja WF kg 8,447.39 - -
2 Pek. Rangka Atap Baja Ringan m2 119.70 190,000.00 22,743,000.00
3 Pekerjaan Gording Canal kg 2,332.84 - -
4 Pek. Sagrood Ø 12mm kg 18.00 - -
5 Pek. Track Stang Ø 12mm kg 58.83 - -
6 Pek. Plat Baja kg 114.11 - -
7 Pek. Baut Mur 16mm m2 352.00 - -
8 Pek. Baut Angker M22, L = 60 cm m' 176.00 - -
9 Pek. Atap Spandek 0.3mm m 273.81 Err:509 Err:509
10 Pek. Bubungan Spandek bh 30.30 Err:509 Err:509
11 Pek. Atap Genteng m2 127.15 - -
12 Pek. Bubungan Genteng m' 31.35 - -
13 Pekerjaan Pasang Lisplank m' 91.94 - -
14 Pek. Tatab m' 46.60 - -
15 Pek. Murda bh 2.00 - -
16 Pek. Ikut Celedu bh 4.00 - -
Jumlah Err:509

c Pekerjaan Kusen Pintu dan Jendela


1 Pekerjaan Kusen Pintu dan Jendela Aluminium m 76.320 - -
2 Pekerjaan Daun Pintu Aluminium m2 3.780 - -
3 Pekerjaan Daun Jendela Aluminium Panil Kaca m2 17.744 - -
4 Pekerjaan Kusen Pintu Besi Profil C NP m 7.00 - -
5 Pekerjaan Daun Pintu Besi rangka L 50.50.5 m2 3.99 - -
6 Pasang Engsel Pintu baja As 1" pasang 3.00 - -
7 Pasang Kunci Pintu Baja pasang 1.00 - -
8 Pasang Grendel Tanam untuk Pintu baja Set 2.00 - -
9 Pasang Engsel Pintu pasang 4.000 - -
10 Pasang Kunci Pintu pasang 2.000 - -
11 Pasang Grendel Pintu pasang 2.000 - -
12 Pasang Engsel Jendela pasang 48.000 - -
13 Pasang Grendel Jendela pasang 12.000 - -
14 Pasang Kait Angin pasang 24.000 - -
15 Pekerjaan Penutup Man Hole Plat Besi T=1,2 mm bh 2.00 Err:509 Err:509
16 Pekerjaan Grill Penutup Besi Strip 30x3 mm m2 30.40 1,087,936.03 33,073,255.16
17 Pekerjaan Railing m' 383.73 Err:509 Err:509
Jumlah Err:509
d Pekerjaan Finishing
1 Pekerjaan Pengecatan Dinding m2 306.875 - -
2 Pekerjaan Politur Lisplank m2 13.79 - -
3 Pekerjaan Pengecatan Rangka Baja m2 115.74 - -
4 Meni dan Cat Besi m2 7.98 - -
5 Ornamen Ukir Style Bali m2 15.24 3,129,740.63 47,697,247.13
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
6 Pekerjaan Waterproofing m2 3,913.61 - -
7 Pekerjaan Pasangan Keramik Lantai m2 53.71 - -
8 Pekerjaan Lapis Keramik pada Gutter m2 221.79 - -
Jumlah 47,697,247.13
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6

- PEKERJAAN BANGUNAN PENGELOLA #REF!


1 PEKERJAAN TANAH
1 Galian Tanah dengan excavator m3 43.66 - -
2 Pengukuran dan Bouwplank m' 327.44 - -
3 Urugan Tanah Kembali dengan Pemadatan m3 191.54 - -
4 Urugan Pasir t = 10 cm m3 15.64 - -
Jumlah -
2 PEKERJAAN STRUKTUR ATAU SIPIL DAN ASITEKTUR
a Pekerjaan Beton
1 Pekerjaan Beton Rabat K125 m3 4.73 - -
2 Pekerjaan Pondasi Bor Pile
- Pembuatan lubang Bor Pile Ø 40 cm m 8.06 #REF! #REF!
- Beton Cor K-300 m3 1,033.02 - -
- besi Beton Kg 26.88 - -
3 Pekerjaan Beton Pondasi Plat Kaki R. Pengelola
- Beton Cor K-225 m3 8.62 - -
- Pekerjaan Besi Beton Kg 1,822.37 - -
- Pekerjaan Begesting 2 X pakai m2 114.91 - -
4 Beton Kolom Lt 1 R. Pengelola
- Beton Cor K-225 m3 6.21 - -
- Pekerjaan Besi Beton Kg 1,693.73 - -
- Pekerjaan Begesting 2 X pakai m2 50.76 - -
5 Balok Sloof ( S1 dan SP ) R. Pengelola
- Beton Cor K-225 m3 6.36 - -
- Pekerjaan Besi Beton Kg 2,057.17 - -
- Pekerjaan Begesting 2 X pakai m2 76.67 - -
6 Balok Lantai 1 ( B1 & TP ) R.Pengelola
- Beton Cor K-225 m3 5.63 - -
- Pekerjaan Besi Beton Kg 1,153.03 - -
- Pekerjaan Begesting 2 X pakai m2 59.67 - -
7 Beton Balok Lt.2 R. Pengelola
- Beton Cor K-225 m3 12.00 - -
- Pekerjaan Besi Beton Kg 1,542.18 - -
- Pekerjaan Begesting 2 X pakai m2 100.00 - -
8 Beton Plat Lantai 2 R. Pengelola
- Beton Cor K-225 m3 6.31 - -
- Pekerjaan Besi Beton Kg 606.63 - -
- Pekerjaan Begesting 2 X pakai m2 91.08 - -
9 Beton Plat Lantai 2 R. Pengelola ( T10-01)
- Beton Cor K-225 m3 2.63 - -
- Pekerjaan Besi Beton Kg 762.98 - -
- Pekerjaan Begesting 2 X pakai m2 20.78 - -
10 Beton Tangga R. Pengelola
- Beton Cor K-225 m3 6.44 - -
- Pekerjaan Besi Beton Kg 1,367.89 - -
- Pekerjaan Begesting 2 X pakai m2 85.85 - -
11 Beton Kolom Lt 2 R. Pengelola
- Beton Cor K-225 m3 2.89 - -
- Pekerjaan Besi Beton Kg 642.62 - -
- Pekerjaan Begesting 2 X pakai m2 31.35 - -
12 Beton Ring Balok R. Pengelola
- Beton Cor K-225 m3 0.81 - -
- Pekerjaan Besi Beton Kg 267.29 - -
- Pekerjaan Begesting 2 X pakai m2 21.56 - -
13 Beton Kolom Praktis R. Pengelola
- Beton Cor K-225 m3 4.32 - -
- Pekerjaan Besi Beton Kg 215.80 - -
- Pekerjaan Begesting 2 X pakai m2 19.80 - -
Jumlah #REF!

b Pekerjaan Pasangan dan Dinding


1 Pekerjaan Dinding Pasangan Bata 1:4 m2 272.67 - -
2 Pekerjaan Dinding Pasangan Bata 1:2 m2 39.10 - -
3 Pekerjaan Plesteran 1:4 m2 545.34 - -
4 Pekerjaan Plesteran 1:2 m2 78.20 - -
5 Pekerjaan Acian Dinding m2 623.54 - -
6 Pekerjaan Pas. Keramik Lantai 40 x 40 m2 157.56 - -
7 Pekerjaan lantai keramik stepnozing m1 24.50 - -
8 Pek. Pasangan Batu Paras Sangsit m2 105.40 - -
9 Ornamen ukir style bali m2 13.93 - -
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
10 Pekerjaan Pasangan Batu Kosong m3 14.04 - -
11 Pekerjaan Pondasi Batu Kali m3 45.59 - -
12 Pekerjaan Pas. Keramik dinding 20 x 60 m2 33.13 - -
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
13 Pek. Pas Keramik Lantai 30 x 30 Cm m2 6.56 - -
14 Pekerjaan Pas. Keramik plin 10 x 40 m1 110.46 - -
15 Pekerjaan Pasangan Pepalihan Style Bali m2 219.86 - -
Jumlah -

c Pekerjaan Kusen, Pintu dan Jendela


1 Pekerjaan Kusen Pintu dan Jendela Aluminium m 203.00 - -
2 Pekerjaan Kusen Pintu Kayu Kamfer m³ 5.65 - -
3 Talang air hujan m 17.18 - -
4 Daun Pintu bingkai Allumunium m2 14.81 - -
5 Daun Pintu Kamfer m2 2.57 - -
6 Jendela Kaca Bingkai Alumunium m2 42.04 - -
7 Pasang Engsel Pintu pasang 20.00 - -
8 Pasang Engsel Jendela pasang 32.00 - -
9 Pasang Kunci Pintu pasang 8.00 - -
10 Pasang Grendel Jendela pasang 32.00 - -
11 Pasang Kait Angin pasang 32.00 - -
Jumlah -

d Pekerjaan Atap dan Plafond


1 Pekerjaan Kap Baja Ringan m2 80.30 175,000.00 14,052,937.50
2 Pasang Atap Genteng Keramik glasur m2 152.49 - -
3 Pasang Genteng Bubungan Keramik glasur m 45.81 - -
4 Pek. Pasang Listplank Kayu kanfer Profil m 72.80 - -
5 Murda Paras Ukir unit 3.00 - -
6 Ikut Celedu Paras Ukir unit 8.00 - -
7 Pekerjaan Plafond Gypsum Rangka Hollow m2 135.38 - -
8 Pekerjaan list Plafond m 152.78 - -
9 Pekerjaan Railing Tangga dan Balkon (Stainless Steel) m 8.87 Err:509 Err:509
10 Pek. Lambesering m2 72.21 - -
11 Pek. List Plafond Lambesering m 67.12 - -
Jumlah Err:509

e Pekerjaan Finishing
1 Pekerjaan Pengecatan Dinding Luar m2 201.79 - -
2 Pekerjaan Pengecatan Dinding Dalam m2 478.79 - -
3 Pekerjaan Pengecatan Plafond m2 135.38 - -
4 Pekerjaan Polituran Listplank m2 73.33 - -
5 Pekerjaan Pengecatan Rangka Baja m2 343.60 - -
6 Pekerjaan Polituran Lambesering m2 72.21 - -
Jumlah -

f Pekerjaan Toilet
1 Instalasi Plumbing Air Bersih m 25.00 42,900.00 1,072,500.00
2 Instalasi Plumbing Air Kotor m 36.00 231,170.50 8,322,138.00
3 Closet duduk bh 2.00 - -
4 Pasang Washtafel set 2.00 - -
5 Pasang Floor Drain set 2.00 - -
6 Pasang Kran air set 4.00 - -
Jumlah 9,394,638.00

- PEKERJAAN BANGUNAN KIMIA DAN CHLORINE 60,389,226.87


1 PEKERJAAN TANAH
1 Pengukuran dan Pasang Bowplank m' 66.20 - -
2 Galian Tanah dengan Excavator m3 91.79 - -
3 Urugan Tanah Kembali dengan Pemadatan m3 27.59 - -
4 Urugan Pasir m3 11.65 - -
Jumlah -

2 PEKERJAAN STRUKTUR ATAU SIPIL DAN ASITEKTUR


a Pekerjaan Beton
1 Lantai Kerja K 125 ( 1 pc : 3 ps : 5 Kr) m3 7.40 - -
2 Pondasi Beton Plat Kaki
- Beton K 300 m3 4.95 - -
- Pembesian kg 781.16 - -
- Begesting Batako m2 19.80 - -
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
3 Balok Dasar Sloof
- Beton K 300 m3 6.42 - -
- Pembesian kg 926.15 - -
- Begesting 2x Pakai m2 64.16 - -
4 Beton Kolom
- Beton K 300 m3 12.05 - -
- Pembesian kg 2,449.06 - -
- Begesting 2x Pakai m2 163.03 - -
5 Beton Balok
- Beton K 300 m3 16.52 - -
- Pembesian kg 3,246.20 - -
- Begesting 2x Pakai m2 177.67 - -
6 Plat Lantai
- Beton K 300 m3 7.25 - -
- Pembesian kg 1,225.38 - -
7 Plat Atap
- Beton K 300 m3 12.22 - -
- Pembesian kg 2,617.31 - -
- Begesting 1x Pakai m2 101.82 - -
8 Beton Dudukan Tabung dan Bak Pencampur
- Beton K 300 m3 4.42 - -
- Pembesian kg 804.74 - -
- Begesting 2x Pakai m2 56.51 - -
9 Beton Lisplank
- Beton K 300 m3 2.26 - -
- Pembesian kg 970.54 - -
- Begesting 2x Pakai m2 73.46 - -
Jumlah -

b Pekerjaan Pasangan dan Pelapis


1 Pekerjaan Pasangan Batu Kosong m3 16.98 - -
2 Pekerjaan Pasangan Batu Kali 1:4 m3 28.65 - -
3 Pekerjaan PasanganDinding Bata 1:2 m2 435.61 - -
4 Pekerjaan Plesteran Dinding 1:2 m2 37.35 - -
5 Pekerjaan Plesteran Dinding 1 PC : 5 Ps m2 833.88 - -
6 Pekerjaan Acian Dinding m2 833.88 - -
7 Pekerjaan Pasangan Keramik Lantai 40 x 40 cm m2 833.88 - -
8 Pek. Pasangan Batu Paras Sangsit m2 40.53 - -
9 Pekerjaan Lapisan Fiber Glass (2 x Lapis) m2 39.51 507,788.60 20,064,555.62
10 Pekerjaan Plafond Gypsum Rangka Hollow m2 206.66 - -
11 Pekerjaan list Plafond m 78.46 - -
12 Pekerjaan Pas. Keramik lantai 30 x 30 m2 70.45 - -
13 Pas. Keramik 20x30 cm m2 4.30 - -
14 Pek. Pasangan Keramik Dinding KM 20 x 25 Cm m2 17.43 - -
15 Pas. Stepnozing m' 8.30 - -
16 Pekerjaan Toilet
- Instalasi Plumbing Air Bersih m 20.00 42,900.00 858,000.00
- Instalasi Plumbing Air Kotor m 15.00 231,170.50 3,467,557.50
- Pasang Closet Duduk bh 1.00 - -
- Pasang Washtafel set 1.00 - -
- Pasang Floor Drain set 1.00 - -
- Pasang Kran air set 1.00 - -
- Pekerjaan Septick Tank dan peresapan unit 1.00 - -
- Pompa Air Bersih unit 1.00 3,850,000.00 3,850,000.00
Jumlah 28,240,113.12
c Pekerjaan Atap
1 Pekerjaan Atap Baja Ringan m2 167.96 190,000.00 31,912,400.00
2 Pekerjaan Pasangan Atap Genteng m2 115.60 - -
3 Pekerjaan Pas Bubungan m' 42.29 - -
4 Pekerjaan Pas. Ikut Celedu unit 4.00 - -
5 Pekerjaan Pas. Murda unit 2.00 - -
6 Pekerjaan Pas. Listplank m' 125.92 - -
7 Pekerjaan Pas. Tatab m' 63.40 - -
8 Pek. Cat Listplank m2 31.48 - -
Jumlah 31,912,400.00
d Pekerjaan Kusen, Pintu, Jendela dan Relling
1 Pekerjaan Kusen Pintu dan Jendela Aluminium m 20.480 - -
2 Pekerjaan Daun Pintu Aluminium m2 3.21 - -
3 Pekerjaan Daun Jendela Aluminium Panil Kaca m2 2.45 - -
4 Pekerjaan Kusen Kayu m3 0.02 - -
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
5 Pekerjaan Daun Jendela Jalusi m2 0.35 676,325.00 236,713.75
6 Pekerjaan Kusen Pintu Besi Profil C NP m 26.10 - -
7 Pekerjaan Daun Pintu Besi rangka L 50.50.5 m2 34.32 - -
8 Pasang Engsel Pintu pasang 2.00 - -
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
9 Pasang Engsel Jendela pasang 8.00 - -
10 Pasang Handle dan Kunci Pintu pasang 1.00 - -
11 Pasang Grendel Jendela pasang 4.00 - -
12 Pasang Kait Angin pasang 8.00 - -
13 Pasang Engsel Pintu baja As 1" pasang 12.00 - -
14 Pasang Kunci Pintu Baja pasang 2.00 - -
15 Pasang Grendel Tanam untuk Pintu baja Set 4.00 - -
Jumlah 236,713.75

e Pekerjaan Cat
1 Meni dan Cat Besi m2 68.64 - -
2 Plamur dan Cat Tembok m2 833.88 - -
3 Pekerjaan Pengecatan Plafond m2 206.66 - -
Jumlah -

- PEKERJAAN SIPIL BANGUNAN GENSET Err:509


1 PEKERJAAN TANAH
1 Pengukuran dan Pasang Bowplank m' 50.65 - -
2 Galian Tanah dengan excavator m3 354.93 - -
3 Urugan Tanah Kembali dengan Pemadatan m3 224.44 - -
4 Urugan Pasir di bawah lantai m3 13.93 - -
5 Urugan Pasir di bawah Pondasi t = 10 cm m3 38.00 - -
Jumlah -

2 PEKERJAAN STRUKTUR ATAU SIPIL DAN ASITEKTUR


a Pekerjaan Pasangan dan Beton
1 Pekerjaan Pasangan Batu Kosong m3 8.40 - -
2 Pekerjaan Pasangan Pondasi Batu Kali m3 42.10 - -
3 Pekerjaan Beton Rabat
- Cor Beton K125 m3 7.01 - -
4 Pekerjaan Beton pondasi Plat kaki
- Beton Cor K-225 m3 5.83 - -
- besi Beton Kg 2,974.19 - -
- Begesting Pasangan Batako 1:5 m2 15.36 - -
5 Pekerjaan Beton Sloope
- Beton Cor K-225 m3 5.04 - -
- besi Beton Kg 1,126.08 - -
- Begesting 2 X pakai m2 33.60 - -
6 Pekerjaan Beton Kolom
- Beton Cor K-225 m3 8.33 - -
- besi Beton Kg 2,121.56 - -
- Begesting 2 X pakai m2 105.18 - -
7 Pekerjaan Beton Lantai Dan Pondasi Genset
- Beton Cor K-300 m3 16.49 - -
- besi Beton Kg 270.78 - -
8 Pekerjaan Beton Balok Atap
- Beton Cor K-225 m3 11.42 - -
- besi Beton Kg 1,964.15 - -
- Begesting 2 X pakai m2 80.86 - -
9 Pekerjaan Beton Plat Atap
- Beton Cor K-225 m3 15.01 - -
- besi Beton Kg 2,016.08 - -
- Begesting 1 X pakai m2 124.82 - -
10 Pekerjaan Beton Listplank
- Beton Cor K-225 m3 3.10 - -
- besi Beton Kg 698.79 - -
- Begesting 2 X pakai m2 50.09 - -
11 Kolom Praktis dan Balok Latei
- Beton Cor K-225 m3 1.07 - -
- besi Beton Kg 224.43 - -
- Begesting 2 X pakai m2 21.38 - -
12 Pekerjaan Pasangan Dinding Bata 1 Pc : 4 Ps m3 197.50 - -
13 Pekerjaan Plesteran Dinding 1 Pc : 4 Ps m3 298.12 - -
14 Pekerjaan Acian Dinding m3 474.25 - -
15 Pekerjaan Water Proofing ( Atap ) m2 161.84 - -
16 Pekerjaan Beton Sloope, Ring Balk & Kolom Praktis m3 0.90 - -
17 Pekerjaan Pas. Keramik Lantai 30 x 30 m2 21.43 - -
Jumlah -

b Pekerjaan Kusen Pintu dan Jendela


HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
1 Pekerjaan Kusen Pintu dan Jendela Aluminium m 21.16 - -
2 Pekerjaan Daun Jendela Jalusi m2 10.37 Err:509 Err:509
3 Pekerjaan Kusen Pintu Besi Profil C NP 140 x 60 x 7 mm m 29.63 - -
4 Pekerjaan Pintu Plat baja 2 sisi dalamnya Glass wool m2 13.68 - -
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
5 Pasang Engsel Pintu baja As 1" pasang 18.00 - -
6 Pasang Kunci Pintu Baja pasang 4.00 - -
7 Pasang Grendel Tanam untuk Pintu baja Set 4.00 - -
8 Talang Air Hujan m' 20.80 - -
9 Baut Angkur M22 Penjangkaran 1000 mm bh 10.00 - -
Jumlah Err:509

c Pekerjaan Finishing
1 Pekerjaan Pengecatan Dinding (Plamuur dan Cat Tembok) m2 437.28 - -
2 Pek. Pasangan Bata Paras Sangsit m2 25.90 - -
3 Pekerjaan Pasangan Pepalihan Style Bali (Batu Paras Sangsit) m2 90.12 - -
Jumlah -

- PEKERJAAN BANGUNAN IPAL Err:509


1 Pekerjaan Tanah
1 Pengukuran dan Pasang Bowplank m' 83.20 - -
2 Galian Tanah dengan Excavator m3 311.75 - -
3 Urugan Tanah Kembali dengan Pemadatan m3 51.54 - -
4 Urugan Pasir m3 13.85 - -
5 Kerikil Halus gradasi butiran Ø 0.3 - 1.75 Cm m3 22.94 220,327.80 5,055,035.80
6 Pasir Halus gradasi butiran Ø 0.4 - 0.7 mm m3 25.03 193,004.90 4,830,719.64
Jumlah 9,885,755.44

2 PEKERJAAN STRUKTUR ATAU SIPIL DAN ASITEKTUR


a Pekerjaan Beton
1 Lantai Kerja K 125 ( 1 pc : 3 ps : 5 Kr) m3 6.93 - -
2 Beton Plat Lantai
- Beton K 300 m3 46.32 - -
- Pembesian kg 6,092.49 - -
- Begesting 2x Pakai m2 27.49 - -
3 Pekerjaan Beton Dinding dan Saluran
- Beton K 300 m3 75.06 - -
- Pembesian kg 10,500.55 - -
- Begesting 2x Pakai m2 500.43 - -
Jumlah -
b PEKERJAAN LAIN LAIN
1 Pekerjaan Baja Profil I WF 250 X 125 X 5 mm Kg 475.92 - -
2 Pekerjaan Baja Profil I NP 60 Kg 177.24 - -
3 Pekerjaan Besi Plat Tebal 5 cm Kg 577.76 - -
4 Pekerjaan Grill Penutup Besi strip 30 x 3 mm m2 9.35 1,087,936.03 10,172,201.83
5 Pekerjaan Pintu Air Unit 2.00 271,984.01 543,968.02
6 Pekerjaan Pintu Air dari kayu ulin / besi lubang 400 x 300 mm unit 2.00 15,334,000.00 30,668,000.00
7 Pekerjaan waterproofing m2 288.66 - -
8 Baut Angkur M22 Penjangkaran 1000 mm bh 16.00 - -
9 Plat Andas 300 x 300 x 18 mm bh 2.00 Err:509 Err:509
10 Meni dan Cat Besi m2 15.78 - -
Jumlah Err:509

- PEKERJAAN BANGUNAN RESERVOIR KAPASITAS 2600 M3 #REF!


1 PEKERJAAN TANAH
1 Pengukuran dan Pasang Bowplank m' 133.40 - -
2 Galian Tanah dengan excavator m3 3,022.19 - -
3 Urugan Tanah Kembali dengan Pemadatan m3 212.70 - -
4 Urugan Pasir t = 10 cm m3 69.48 - -
Jumlah -
2 PEKERJAAN STRUKTUR ATAU SIPIL DAN ASITEKTUR
a Pekerjaan Beton
1 Pekerjaan Pondasi Bor Pile
- Pembuatan lubang Bor Pile Ø 40 cm m 980.00 #REF! #REF!
- Beton Cor K-300 m3 123.09 - -
- besi Beton Kg 20,203.79 - -
2 Lantai Kerja K - 125 (1 PC : 3 PS : 5KR)
- Cor Beton Camp 1:3:5 m3 50.33 - -
3 Pekerjaan Beton pondasi Plat Setempat & Keliling
- Beton Cor K-300 m3 105.41 - -
- besi Beton Kg 39,177.49 - -
- Begesting Pasangan Batako m2 230.24 - -
4 Pekerjaan Sloof
- Beton Cor K-300 m3 46.98 - -
- Pekerjaan Besi Beton Kg 15,145.60 - -
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Begesting Pasangan Batako m2 313.20 - -
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
5 Pekerjaan Beton Lantai
- Beton Cor K-300 m3 247.14 - -
- besi Beton Kg 41,030.07 - -
6 Pekerjaan Beton Kolom
- Beton Cor K-300 m3 68.85 - -
- besi Beton Kg 15,896.45 - -
- Begesting 2 X pakai m2 635.06 - -
7 Pekerjaan Beton Dinding Basement
- Beton Cor K-300 m3 320.38 - -
- besi Beton Kg 34,908.46 - -
- Begesting 2 X pakai m2 2135.88 - -
- Pekerjaan Tie Rod pada Bekisting Vertikal m1 1669.60 68,500.00 114,367,600.00
8 Pekerjaan Beton Balok
- Beton Cor K-300 m3 68.99 - -
- besi Beton Kg 13,276.15 - -
- Begesting 2 X pakai m2 588.56 - -
9 Pekerjaan Beton Plat Atap
- Beton Cor K-300 m3 95.70 - -
- besi Beton Kg 18,810.82 - -
- Begesting 1 X pakai m2 793.73 - -
10 Pekerjaan Beton Listplang
- Beton Cor K-300 m3 8.44 - -
- besi Beton Kg 1,014.72 - -
- Begesting 2 X pakai m2 185.77 - -
11 Pekerjaan Tangga
- Beton Cor K-300 m3 3.31 - -
- besi Beton Kg 854.28 - -
- Begesting 2 X pakai m2 15.40 - -
12 Pekerjaan Dudukan Pompa dan Pipa
- Beton Cor K-300 m3 0.23 - -
- besi Beton Kg 255.93 - -
- Begesting 2 X pakai m2 6.96 - -
Jumlah #REF!

b Pekerjaan Pasangan dan Pelapis


1 Pekerjaan PasanganPondasi Batu Kali m3 2.20 - -
2 Pekerjaan Pas, Dinding Bata Merah 1 : 2 m2 559.44 - -
3 Pekerjaan Pas, Dinding Bata Merah 1 : 4 m2 55.92 - -
4 Pekerjaan Pas. Batako m2 402.90 - -
5 Pekerjaan Water Proofing m2 3,901.92 - -
6 Pekerjaan Water Stop m 960.05 - -
7 Pekerjaan Plesteran 1 PC : 2 Ps m2 1,118.88 - -
8 Pekerjaan Plesteran 1 PC : 4 Ps m2 142.20 - -
9 Pekerjaan Acian m2 371.10 - -
10 Pek. Pasangan Bata Paras Sangsit m2 32.87 - -
10 Meni dan cat besi m2 11.51 - -
Jumlah -

c Pekerjaan Kusen Pintu dan Relling


1 Pekerjaan Kusen Aluminium m' 27.50 - -
2 Pekerjaan Daun Pintu Panil m2 1.94 - -
3 Pekerjaan Jendela Jelusi m2 1.73 - -
4 Pas. Engsel Pintu bh 2.00 - -
5 Pasang Handle + Kunci Pintu bh 1.00 - -
6 Pekerjaan Kusen Pintu Baja Profil L 70.70.6 m2 11.20 - -
7 Pekerjaan Daun Pintu Besi rangka L 50.50.5 m2 11.51 - -
8 Pasang Engsel Pintu baja As 1" pasang 3.00 235,361.50 706,084.50
9 Pasang Kunci Pintu Baja set 1.00 225,000.00 225,000.00
10 Pasang Grendel Tanam untuk Pintu baja pasang 2.00 138,527.50 277,055.00
11 Pekerjaan Pipa Ventilasi GIP 4" Unit 7.00 750,000.00 5,250,000.00
12 Pekerjaan Penutup Man Hole Plat Besi T= 1.2 mm Unit 7.00 Err:509 Err:509
13 Pekerjaan Tangga Inspeksi Pipa GIP Unit 7.00 Err:509 Err:509
14 Railling Balkon dan Tangga (Pipa Black Steel) m' 31.68 Err:509 Err:509
Jumlah Err:509

- PEKERJAAN BANGUNAN POS JAGA 9,394,638.00


1 Pekerjaan Tanah
1 Pengukuran dan Pasang Bowplank m' 32.40 - -
2 Galian Tanah dengan excavator m3 23.35 - -
3 Urugan Tanah Kembali dengan Pemadatan m3 10.48 - -
4 Urugan Pasir t = 10 cm m3 1.13 - -
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
5 Pek. Urugan Tanah Peninggian Lantai m3 1.50 - -
6 Pek. Urugan Pasir Lantai Kerja m3 1.07 - -
Jumlah -
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
2 PEKERJAAN STRUKTUR ATAU SIPIL DAN ASITEKTUR
a Pekerjaan Beton
1 Lantai Kerja K - 125
- Cor Beton K-125 m3 1.07 - -
2 Pekerjaan Sloof
- Beton Cor K-175 m3 1.44 - -
- Pekerjaan Besi Beton Kg 163.30 - -
- Begesting Pasangan Batako m2 14.35 - -
3 Pekerjaan Beton Kolom
- Beton Cor K-175 m3 0.96 - -
- besi Beton Kg 193.49 - -
- Begesting 2 X pakai m2 25.51 - -
4 Pekerjaan Beton Balok
- Beton Cor K-175 m3 1.57 - -
- besi Beton Kg 273.81 - -
- Begesting 2 X pakai m2 29.94 - -
5 Pekerjaan Beton Plat Atap
- Beton Cor K-175 m3 1.79 - -
- besi Beton Kg 419.47 - -
- Begesting 2 X pakai m2 14.88 - -
6 Pekerjaan Beton Lisplank
- Beton Cor K-175 m3 0.61 - -
- besi Beton Kg 249.26 - -
- Begesting 2 X pakai m2 13.76 - -
7 Pekerjaan Meja Beton
- Beton Cor K-175 m3 0.10 - -
- besi Beton Kg 25.69 - -
- Begesting 2 X pakai m2 1.95 - -
Jumlah -

b Pekerjaan Pasangan dan Pelapis


1 Pekerjaan Pasangan Batu Kosong m3 3.40 - -
2 Pekerjaan Pasangan Batu Kali Camp 1 : 5 m3 9.04 - -
3 Pekerjaan Pasangan Bata Camp 1:5 m2 99.88 - -
4 Pekerjaan Trasram m2 13.68 - -
5 Pekerjaan Plesteran 1 PC : 5 PS m2 199.76 - -
6 Pekerjaan Acian m2 199.76 - -
7 Pekerjaan Cat Dinding m2 199.76 - -
8 Pek. Pas. Batu Alam Random m2 13.76 - -
9 Pek. Tempelan Batu Candi m2 30.83 - -
Jumlah -

c Pekerjaan Atap
1 Pekerjaan Rangka Kuda-Kuda Atap m3 0.46 - -
2 Pekerjaan Usuk dan Reng m2 53.04 - -
3 Pekerjaan Pasangan Atap Genteng m2 18.71 - -
4 Pekerjaan Pas Bubungan m' 22.15 - -
5 Pekerjaan Pas. Ikut Celedu unit 4.00 - -
6 Pekerjaan Pas. Murda unit 2.00 - -
7 Pekerjaan Pas. Listplank m' 19.40 - -
8 Pekerjaan Pas. Tatab m' 19.72 - -
9 Pek. Cat Listplank m2 9.70 - -
Jumlah -
d Pekerjaan Langit-Langit
1 Pas. Plafond Kasiboard Rangka Hollow m3 21.37 - -
2 Pas. List Gypsum m' 37.60 - -
3 Pek. Cat Plafond m2 21.37 - -
Jumlah -
e Pekerjaan Penutup Lantai
1 Pas.Keramik 30 x 30 cm m2 20.68 - -
2 Pas. Keramik 20x30 cm m2 2.25 - -
3 Pas. Keramik Dinding m2 12.60 - -
4 Pas. Stepnozing m' 6.00 - -
Jumlah -
f Pekerjaan Kusen Pintu dan Jendela
1 Pas. Kusen Kayu Kamper m3 0.23 - -
2 Pas. Daun Pintu Kayu Kamper m2 5.19 - -
3 Pas. Jendela Kaca m2 1.76 - -
4 Pas. Kaca Bening t = 5 mm m2 0.78 - -
5 Pas. Engsel Pintu set 6.00 - -
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
6 Pas. Grendel Pintu unit 2.00 - -
7 Pas. Handle & Kunci Pintu m' 2.00 - -
8 Pas. Engsel Jendela unit 8.00 - -
9 Pas. Grendel Jendela unit 4.00 - -
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
10 Pas. Kait Angin unit 8.00 - -
11 Pek. Polituran m2 28.50 - -
Jumlah -
g Pekerjaan Toilet
1 Instalasi Plumbing Air Bersih m 25.00 42,900.00 1,072,500.00
2 Instalasi Plumbing Air Kotor m 36.00 231,170.50 8,322,138.00
3 Closet duduk bh 1.00 - -
4 Pasang Washtafel set 1.00 - -
5 Pasang Floor Drain set 1.00 - -
6 Pasang Kran air set 2.00 - -
7 Pekerjaan Septiktank unit 1.00 - -
8 Pekerjaan Peresapan unit 1.00 - -
Jumlah 9,394,638.00

571,822,156.82
C BANGUNAN ADAT PURA
1 Pekerjaan Tanah
1 Pengukuran dan Pasang Bowplank m' 63.46 - -
8 Urugan Tanah Biasa dipadatkan m3 384.68 - -
9 Urugan Pasir di bawah Pondasi t = 10 cm m3 4.04 - -
Jumlah 1 -

2 Pekerjaan Padmasana & Pelinggih Lain


1 Pek. Padmasana (Batu Tabas Karangasem) set 1.00 92,950,000.00 92,950,000.00
2 Pek. Pasangan Paving Stone/Block m2 160.24 - -
3 Pekerjaan Tugu Pelinggih Wisnu Ls 1.00 22,000,000.00 22,000,000.00
4 Pekerjaan Tugu Penunggun Karang Ls 1.00 22,000,000.00 22,000,000.00
5 Pekerjaan Penyengker Ls
- Pek. Pasangan Batu Kali 1 : 5 m3 29.20 - -
- Pek. Candi Bentar unit 2.00 - -
- Pek. Paduraksa unit 9.00 - -
- Pek. Tembok Penyengker m' 27.76 - -
- Pek. Beton Sloof, Kolom, dan Balok K175 m3 2.05 - -
- Pek. Begesting Sloof 2x Pakai m2 12.76 - -
- Pek. Begesting Kolom 2x Pakai m2 3.69 - -
- Pek. Begesting Balok 2x Pakai m2 17.50 - -
- Pek. Pembesian kg 409.10 - -
- Pek. Pengeresek m3 2.02 - -
- Pek. Pasangan Bata Camp. 1 : 5 m2 24.98 - -
6 Pekerjaan Piyasan Ls 1.00 50,765,000.00 50,765,000.00
7 Pekerjaan Penunggun Karang (Belakang) Unit 1.00 19,250,000.00 19,250,000.00
8 Railling Balkon dan Tangga (Pipa Black Steel) m 23.46 15,552,308.48 364,857,156.82
Jumlah 2 571,822,156.82

331,759,430.06
D PEKERJAAN HALAMAN/LANSCAPE
Pekerjaan Halaman/Lanscape
1 Pengukuran dan Pasang Bowplank m' 283.24 - -
2 Galian Tanah dengan excavator m3 36.78 - -
3 Pasangan Paving Block t = 10 cm m2 735.56 - -
4 Pas. Saluran Uditch 50x50 x120 mm m' 350.72 - -
5 Pas Grill Saluran m2 94.78 1,500,000.00 142,176,000.00
6 Pas. Gasebo Unit 1.00 79,750,000.00 79,750,000.00
7 Pas. Kansteen m' 354.42 - -
8 Pek. Beton Rabat m3 15.36 - -
9 Penanaman Pohon Jepun Bali pohon 18.00 1,796,733.92 32,341,210.48
10 Penanaman Pohon Palem Putri pohon 25.00 1,250,000.00 31,250,000.00
11 Penanaman Pohon Lontar pohon 3.00 725,000.00 2,175,000.00
12 Penananaman Pohon Kelapa Gading pohon 5.00 254,203.92 1,271,019.58
13 Penanaman Pucuk Merah pohon 75.00 45,000.00 3,375,000.00
14 Penanaman Pohon Soka Bangkok pohon 465.00 15,500.00 7,207,500.00
15 Penanaman Pohon Bakung Putih pohon 385.00 18,500.00 7,122,500.00
16 Penanaman Pohon Kana pohon 450.00 25,000.00 11,250,000.00
17 Penanaman Rumput m2 346.03 40,000.00 13,841,200.00
Jumlah 331,759,430.06
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
449,825,659.09
E PEKERJAAN PAGAR
Pekerjaan Pagar
1 Pengukuran dan Pasang Bowplank m' 192.81 - -
2 Galian Tanah dengan excavator m3 44.66 - -
3 Pekerjaan DPT Pasangan Batu Kali 1 PC : 4 PS m3 109.96 - -
4 Pekerjaan Beton Sloope, Ring Balk & Kolom Praktis m3 71.62 - -
5 Pekerjaan Siaran m2 200.53 - -
6 Pekerjaan Pasangan Bata Merah 1 Pc : 5 Ps m2 154.25 - -
7 Pekerjaan Plesteran Tembok 1 PC : 4 PS m2 308.50 - -
8 Pekerjaan Pagar Style Bali M1 192.81 - -
9 Pek. Paduraksa Style Bali bh 65.00 - -
10 Pek. Gapura Style Bali Ls 1.00 356,469,181.89 356,469,181.89
11 Sign Board Style Bali Ls 1.00 93,356,477.20 93,356,477.20
Jumlah 449,825,659.09

F PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 5,940,000.00

- PEKERJAAN MEKANIKAL DAN ELEKTRIKAL BANGUNAN IPA KAPASITAS 165 L/DTK 10,904,873,315.32
a Pengadaan mekanikal dan aksesoris
1 Perpipaan Koagulator
- Ø 500 mm x 0,60 m' Flange Spigot Steel unit 3.000 2,671,680.00 8,015,040.00
Ø 500 mm DI Gate Valve resilient seat lengkap dengan
- unit 1.000 105,494,400.00 105,494,400.00
Floor Stand
- Ø 500 mm Steel pipa Prasedimentsi ke Koagulator m' 25.000 2,788,646.66 69,716,166.58
- Ø 500 mm x 90 Steel Bend fl -fl unit 6.000 6,177,600.00 37,065,600.00
- Ø 500 mm x 45 Steel Bend fl -fl unit 2.000 6,210,600.00 12,421,200.00
- Ø 500 mm Bell Mouth unit 1.000 2,566,080.00 2,566,080.00
- Ø 500 mm Flange las unit 10.000 845,607.82 8,456,078.18
- Ø 500 mm Flange las unit 6.000 845,607.82 5,073,646.91
- Ø 500 mm Karet Packing unit 10.000 42,988.00 429,880.00
- Ø 500 mm Karet Packing unit 6.000 42,988.00 257,928.00
- 1" x 5" Baud Mur set 200.000 29,700.00 5,940,000.00
- Ø 500 mm x 0,60 m' wall pipe unit 5.000 10,348,800.00 51,744,000.00
unit 2.000 45,144,000.00 90,288,000.00
2 Perpipaan Flokulasi
Pintu Air Ukuran 400 mm x 468 mm lengkap dengan
- unit 10.000 27,722,760.21 277,227,602.08
Floor Stand
- Ø 200 mm Steel pipa Sch. 40 m' 20.000 895,803.34 17,916,066.74
- Ø 100 mm Steel Pipa Sch 40 m' 60.000 712,031.56 42,721,893.72
Ø 200 mm DI Batter Fly Valve Resilent seat lengkap
- unit 2.000 10,098,000.00 20,196,000.00
dengan floor Stand drain
- Ø 200 mm x Ø 100 mm Steel Tee Y fl - fl unit 10.000 1,393,920.00 13,939,200.00
- Ø 100 mm DI Butterfly Valve resilien seat fl - fl unit 18.000 4,158,000.00 74,844,000.00
- Ø 200 mm x 90 Bend Steel All flange unit 2.000 1,438,968.96 2,877,937.92
- Ø 200 mm Karet Packing unit 4.000 25,300.00 101,200.00
- Ø 100 mm Karet Packing unit 20.000 9,680.00 193,600.00
- Ø 100 mm Karet Packing unit 28.000 9,680.00 271,040.00
- 3/4" x 4" Baud Mur set 256.000 22,275.00 5,702,400.00
- M16 Baud mur set 384.000 29,458.00 11,311,872.00
- M20 Baud mur set 48.000 39,768.30 1,908,878.40
- Ø 100 mm x 90 Bend Steel All flange unit 12.000 132,000.00 1,584,000.00
- Ø 100 mm Wall Pipe unit 12.000 896,148.00 10,753,776.00
- Ø 200 mm Flange Las unit 4.000 412,500.00 1,650,000.00
- Ø 100 mm Flange Las unit 48.000 205,920.00 9,884,160.00
3 Perpipaan Sedimentasi
- Ø 300 mm Steel pipa Sch. 40 drain m' 38.000 2,598,676.66 98,749,713.19
- Ø 300 mm Tee Y Steel fl - fl drain unit 12.000 3,843,840.00 46,126,080.00
- Ø 300 mm DI Butterfly Valve lengkap dengan Pneumatic unit 6.000 45,714,240.00 274,285,440.00
- Ø 300 mm x 90 Steel Bend fl - fl unit 6.000 1,872,200.00 11,233,200.00
- Ø 300 mm Flange las unit 12.000 748,000.00 8,976,000.00
- Ø 300 mm Plat Cap unit 6.000 1,785,590.40 10,713,542.40
- Ø 300 mm Karet Packing unit 12.000 36,850.00 442,200.00
- Ø 300 mm Karet Packing unit 6.000 36,850.00 221,100.00
- Ø 700 mm Steel pipa Sch. 40 m' 42.000 5,626,698.00 236,321,316.00
- Ø 700 mm Flange las unit 4.000 3,190,000.00 12,760,000.00
- Ø 700 mm Flange las unit 12.000 3,190,000.00 38,280,000.00
- Ø 700 mm Blange Flange unit 4.000 14,320,152.00 57,280,608.00
- Ø 700 mm x 0,6 m' Flange las unit 4.000 6,945,523.20 27,782,092.80
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Ø 700 mm Karet Packing unit 8.000 56,100.00 448,800.00
- 1" x 5" Baud Mur set 240.000 29,700.00 7,128,000.00

- Highrate Palte Settler Stainless Steel minimal SUS 304 lbr 1,380.000 1,357,105.75 1,872,805,935.00

Pengadaan dan pemasangan 0.30 m' x 0.30 m' x 7.05 m'


- unit 4.000 6,055,038.00 24,220,152.00
SS Gutter
Ø 300 mm DI Butterfly Valve lengkap dengan
- unit 6.000 45,714,240.00 274,285,440.00
Pneumatic (position)
- Ø 400 mm pipa PVC untuk penguras unit 40.000 1,711,875.00 68,475,000.00
- M24 Baud mur set 216.000 44,187.00 9,544,392.00
- M33 Baud mur set 192.000 53,465.50 10,265,376.00
- Ø 300 mm Penguras PVC m' 40.000 1,175,625.00 47,025,000.00
4 Perpipaan Filter
- Ø 200 mm Steel pipa Sch. 40 m' 13.500 895,803.34 12,093,345.05
- Ø 300 mm Steel pipa Sch. 40 m' 16.000 2,598,676.66 41,578,826.61
- Ø 200 mm x 90 Bend Steel All flange unit 6.000 1,438,968.96 8,633,813.76
- Ø 200 mm x 90 Bend Steel All flange unit 1.000 1,438,968.96 1,438,968.96
- Ø 200 DI Butterfly Valve fl - fl lengkap Pneumatic unit 6.000 74,271,312.50 445,627,875.00
- Ø 300 DI Butterfly Valve fl - fl lengkap Pneumatic unit 12.000 73,302,550.75 879,630,609.00
- Ø 300 mm x Ø 200 mm Steel Reducer fl -fl unit 6.000 2,718,144.00 16,308,864.00
- Ø 300 mm x Ø 300 mm Steel Tee fl - fl unit 6.000 3,843,840.00 23,063,040.00
- Ø 300 DI Butterfly Valve fl - fl lengkap Pneumatic unit 6.000 110,624,250.00 663,745,500.00
- Ø 300 mm x 0.60 m' Flange Spigot Steel unit 6.000 1,246,080.00 7,476,480.00
- Ø 200 mm Flange las unit 12.000 453,200.00 5,438,400.00
- Ø 200 mm Flange las unit 32.000 453,200.00 14,502,400.00
- Ø 300 mm Flange las unit 18.000 880,000.00 15,840,000.00
- Ø 300 mm Flange las unit 24.000 880,000.00 21,120,000.00
- Ø 200 mm Karet Packing unit 12.000 25,300.00 303,600.00
- Ø 200 mm Karet Packing unit 26.000 25,300.00 657,800.00
- Ø 300 mm Karet Packing unit 18.000 36,850.00 663,300.00
- Ø 300 mm Karet Packing unit 24.000 36,850.00 884,400.00
- Pengadaan dan pemasangan Nosel filter set 3,672.000 143,675.40 527,576,068.80

- Pengadaan dan Pemasangan Gravel Cilica Uk. 5-30 mm m3 32.400 6,930,000.00 224,532,000.00

- Pengadaan dan Pemasangan Silica sand 0.8 - 1.2 mm m3 75.600 13,513,500.00 1,021,620,600.00

- Ø 200 mm x 0,60 m' wall pipe unit 6.000 641,520.00 3,849,120.00


- Ø 300 mm x 0.60 m' Wall Pipe unit 12.000 3,687,800.60 44,253,607.20
- M24 Baud mur set 504.000 44,187.00 22,270,248.00
- M20 Baud mur set 456.000 39,768.30 18,134,344.80
5 Perpipaan Clear Well ( Out )
- Ø 500 mm x 1000 m' Spigot Flange ( Wall pipe ) unit 1.000 10,348,800.00 10,348,800.00
- Ø 500 mm x Ø 300 mm Steel Tee all flange unit 1.000 8,052,000.00 8,052,000.00
- Ø 500 mm Flange las unit 3.000 1,738,000.00 5,214,000.00
Ø 500 mm DI Gate Valve resilient seat lengkap dengan
- unit 1.000 105,494,400.00 105,494,400.00
Floor Stand
- Ø 300 mm CI Bellmouth unit 1.000 2,566,080.00 2,566,080.00
- Ø 300 mm x 750 mm double Flange ( wall pipe ) unit 3.000 2,354,880.00 7,064,640.00
- Ø 300 mm x 90 Steel Bend all flange unit 2.000 1,872,200.00 3,744,400.00
- Ø 500 mm Karet Packing unit 4.000 42,988.00 171,952.00
- Ø 300 mm Karet Packing unit 4.000 36,850.00 147,400.00
- 1" x 5" Baud Mur set 60.000 29,700.00 1,782,000.00
- 3/4" x 4" Baud Mur set 60.000 22,275.00 1,336,500.00
6 Perpipaan Blower
- Ø 100 mm Steel Pipa Sch 40 m' 23.000 712,031.56 16,376,725.93
- Ø 100 mm x 90 Steel Bend all flange unit 9.000 505,296.00 4,547,664.00
- Ø 100 mm x Ø 100 mm Steel Tee all flange unit 5.000 1,542,024.00 7,710,120.00
- Ø 100 mm Butterfly fl - fl lengkap Pneumatic unit 6.000 18,506,950.00 111,041,700.00
- Ø 100 mm Flange las unit 20.000 205,920.00 4,118,400.00
- Ø 100 mm Flange las unit 15.000 205,920.00 3,088,800.00
- Ø 300 mm Karet Packing unit 20.000 36,850.00 737,000.00
- 5/8" x 4" Baud Mur set 160.000 11,880.00 1,900,800.00
- Ø 50 mm Steel Pipa Sch 40 m 69.000 375,111.00 25,882,659.00
- Ø 50 mm x 90 Steel Bend all flange unit 18.000 41,250.00 742,500.00
- M16 Baud mur set 280.000 29,458.00 8,248,240.00
7 Blower / Air Compressor pencucian
Blower pencucian, Pressure: 35 m', Kap: 4,47 m3/min
- 1030 rpm, 18,5 kW, 3 phase, unit 2.000 226,144,934.40 452,289,868.80
size 125 mm, dilengkapi safety valve
Air Compressor, P = 10kg/cm2, Q = m3/hr, dilengkapi
tangki kapasitas 3000 lt, pressure switch, pressure
- set 2.000 433,899,439.67 867,798,879.33
indikator, safety valve, air dryer, air drain, dan
perpipaan, Motor 18,5kW
HARGA SATUAN JUMLAH
NO Air Compressor,
U R A I A NP =P10kg/cm2,
E K E R QJ = A m3/hr,
A N dilengkapi SAT. VOLUME
tangki kapasitas 3000 lt, pressure switch, pressure ( Rp ) ( Rp )
- set 2.000 433,899,439.67 867,798,879.33
1 indikator, safety valve,2air dryer, air drain, dan 3 4 5 6
perpipaan, Motor 18,5kW

Pompa backwash type centrifugal, Q = 50 L/d, Daya


- unit 2.000 49,034,700.00 98,069,400.00
motor, P = 7,5 kW, eff. Min 85%, 4P 50 Hz, 1450 rpm
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
8 Perpipaan Air Wash
- Ø 150 mm Steel Pipa Sch. 40 m' 30.000 1,251,862.51 37,555,875.39
- Ø 150 mm x 90 Steel Bend all flange unit 9.000 833,976.00 7,505,784.00
- Ø 150 mm x Ø 100 mm Steel Tee all flange unit 5.000 1,542,024.00 7,710,120.00
- Ø 150 mm Butterfly fl - fl lengkap Pneumatic unit 6.000 24,212,100.00 145,272,600.00
- Ø 150 mm Flange las unit 20.000 625,680.00 12,513,600.00
- Ø 150 mm Karet Packing unit 20.000 16,500.00 330,000.00
- 5/8" x 4" Baud Mur set 160.000 11,880.00 1,900,800.00
- Ø 200 mm Steel Pipa Sch. 40 unit 8.000 895,803.34 7,166,426.70
- Ø 300 mm Steel Pipa Sch. 40 unit 13.000 2,598,676.66 33,782,796.62
- Ø 200 mm Butterfly fl - fl lengkap Pneumatic unit 6.000 13,727,191.50 82,363,149.00
- Ø 300 mm Blange Flange unit 1.000 1,485,000.00 1,485,000.00
- Ø 300 mm x Ø 200 mm Steel Tee all flange unit 6.000 2,718,144.00 16,308,864.00
- Ø 200 mm x 90 Steel Bend fl-fl unit 8.000 1,438,968.96 11,511,751.68
- Reducer Ø 300 mm - Ø 200 mm unit 1.000 2,718,144.00 2,718,144.00
- Ø 300 mm Flange las unit 1.000 880,000.00 880,000.00
- Ø 200 mm Karet Packing unit 35.000 25,300.00 885,500.00
- Ø 300 mm Karet Packing unit 1.000 36,850.00 36,850.00
- M24 Baud mur set 24.000 44,187.00 1,060,488.00
- M20 Baud Mur set 420.000 39,768.30 16,702,686.00
Jumlah 10,185,329,609.54
b Pemasangan mekanikal dan aksesoris
1 Perpipaan Koagulator
- Ø 500 mm x 0,60 m' Flange Spigot Steel unit 3.000 845,607.82 2,536,823.45
Ø 500 mm DI Gate Valve resilient seat lengkap dengan
- unit 1.000 246,664.00 246,664.00
Floor Stand
- Ø 500 mm Steel pipa Prasedimentsi ke Koagulator m' 25.000 33,163.22 829,080.45
- Ø 500 mm x 90 Steel Bend fl -fl unit 2.000 113,300.00 226,600.00
- Ø 500 mm x 45 Steel Bend fl -fl unit 2.000 113,300.00 226,600.00
- Ø 500 mm Bell Mouth unit 1.000 104,489.00 104,489.00
- Plat Koagulator Uk. 15 m' x 1,5 m' x 12 mm lengkap konst unit 1.000 2,695,000.00 2,695,000.00
- Ø 500 mm Flange las unit 16.000 845,607.82 13,529,725.09
- Ø 500 mm Karet Packing unit 16.000 1,561.66 24,986.50
- Ø 500 mm x 0,60 m' wall pipe unit 5.000 139,975.00 699,875.00
- M30 Baud Mur set 320.000 892.38 285,560.00
- #REF! unit 2.000 246,664.00 493,328.00
2 Perpipaan Flokulasi
Pintu Air Ukuran 400 mm x 468 mm lengkap dengan
- unit 10.000 1,930,500.00 19,305,000.00
Floor Stand
- Ø 200 mm Steel pipa Sch. 40 m' 20.000 12,286.29 245,725.70
- Ø 100 mm Steel Pipa Sch 40 m' 60.000 6,059.96 363,597.30
- Ø 100 mm Steel Pipa Sch 40 m' 36.000 6,059.96 218,158.38
- Ø 200 mm x Ø 100 mm Steel Tee Y fl - fl unit 10.000 86,949.50 869,495.00
- Ø 100 mm DI Butterfly Valve resilien seat fl - fl unit 10.000 85,800.00 858,000.00
- Ø 100 mm DI Butterfly Valve resilien seat fl - fl unit 8.000 85,800.00 686,400.00
- Ø 200 mm x 90 Bend Steel All flange unit 2.000 87,609.50 175,219.00
- Ø 200 mm Karet Packing unit 4.000 1,561.66 6,246.63
- Ø 100 mm Karet Packing unit 48.000 1,561.66 74,959.50
- M16 Baud Mur set 320.000 892.38 285,560.00
- M20 Baud Mur set 48.000 892.38 42,834.00
- Ø 100 mm x 90 Bend Steel All flange unit 10.000 77,407.00 774,070.00
- Ø 200 mm Flange Las unit 4.000 367,518.25 1,470,073.00
- Ø 100 mm Flange Las unit 40.000 215,392.38 8,615,695.00
3 Perpipaan Sedimentasi
- Ø 300 mm Steel pipa Sch. 40 drain m' 38.000 196,303.35 7,459,527.26
- Ø 300 mm Tee Y Steel fl - fl drain unit 12.000 129,827.50 1,557,930.00
- Ø 300 mm x 90 Steel Bend fl - fl unit 6.000 136,620.00 819,720.00
- Ø 300 mm Flange las unit 12.000 521,723.13 6,260,677.50
- Ø 300 mm Plat Cap unit 6.000 521,723.13 3,130,338.75
- Ø 700 mm Steel pipa Sch. 40 m' 42.000 386,455.10 16,231,114.28
- Ø 700 mm Flange las unit 16.000 1,166,411.13 18,662,578.00
- Ø 700 mm Blange Flange unit 4.000 1,166,411.13 4,665,644.50
- Ø 700 mm x 0,6 m' Flange las unit 4.000 1,166,411.13 4,665,644.50

- Highrate Palte Settler Stainless Steel minimal SUS 304 lbr 1,380.000 60,456.00 83,429,280.00

Ø 300 mm DI Butterfly Valve lengkap dengan


- unit 6.000 215,077.50 1,290,465.00
Pneumatic (position)
- Ø 400 mm pipa PVC untuk penguras unit 40.000 121,680.63 4,867,225.00
- M24 Baud mur set 216.000 892.38 192,753.00
- M33 Baud mur set 192.000 892.38 171,336.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Ø 300 mm Karet Packing unit 18.000 1,561.66 28,109.81
- Ø 700 mm Karet Packing unit 8.000 1,561.66 12,493.25
- Ø 300 mm pipa PVC untuk penguras unit 40.000 121,680.63 4,867,225.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
4 Perpipaan Filter
- Ø 200 mm Steel pipa Sch. 40 m' 13.500 12,286.29 165,864.85
- Ø 300 mm Steel pipa Sch. 40 m' 16.000 196,303.35 3,140,853.58
- Ø 200 mm x 90 Bend Steel All flange unit 6.000 87,609.50 525,657.00
- Ø 200 DI Butterfly Valve fl - fl lengkap Pneumatic unit 6.000 214,901.50 1,289,409.00
- Ø 300 mm x Ø 200 mm Steel Reducer fl -fl unit 6.000 129,827.50 778,965.00
- Ø 300 mm x Ø 300 mm Steel Tee fl - fl unit 6.000 129,827.50 778,965.00
- Ø 300 DI Butterfly Valve fl - fl lengkap Pneumatic unit 6.000 215,077.50 1,290,465.00
- Ø 300 mm x 0.60 m' Flange Spigot Steel unit 6.000 521,723.13 3,130,338.75
- Ø 200 mm Flange las unit 44.000 367,518.25 16,170,803.00
- Ø 300 mm Flange las unit 42.000 521,723.13 21,912,371.25
- Ø 200 mm Karet Packing unit 38.000 1,561.66 59,342.94
- Ø 300 mm Karet Packing unit 42.000 1,561.66 65,589.56
- Ø 300 DI Butterfly Valve fl - fl lengkap Pneumatic unit 12.000 215,077.50 2,580,930.00
- Ø 700 mm Steel pipa Sch. 40 (Header) unit - 386,455.10 -
- Ø 700 mm Blank Flange unit 2.000 1,166,411.13 2,332,822.25
- Ø 200 mm x 0,60 m' wall pipe unit 7.000 101,594.63 711,162.38
- Ø 300 mm x 0.60 m' Wall Pipe unit 12.000 129,910.00 1,558,920.00
- M24 Baud Mur set 504.000 892.38 449,757.00
- M20 Baud Mur set 12.000 892.38 10,708.50
- M33 Baud Mur set 48.000 892.38 42,834.00
5 Perpipaan Clear Well ( Out )
- Ø 500 mm x 1000 m' Spigot Flange ( Wall pipe ) unit 1.000 139,975.00 139,975.00
- Ø 500 mm x Ø 300 mm Steel Tee all flange unit 1.000 164,780.00 164,780.00
- Ø 500 mm Flange las unit 3.000 845,607.82 2,536,823.45
Ø 500 mm DI Gate Valve resilient seat lengkap dengan
- unit 1.000 246,664.00 246,664.00
Floor Stand
- Ø 300 mm CI Bellmouth unit 1.000 88,951.50 88,951.50
- Ø 300 mm x 750 mm double Flange ( wall pipe ) unit 3.000 129,910.00 389,730.00
- Ø 300 mm x 90 Steel Bend all flange unit 2.000 99,253.00 198,506.00
6 Perpipaan Blower
- Ø 100 mm Steel Pipa Sch 40 m' 23.000 6,059.96 139,378.97
- Ø 100 mm x 90 Steel Bend all flange unit 9.000 77,407.00 696,663.00
- Ø 100 mm x Ø 100 mm Steel Tee all flange unit 5.000 79,156.00 395,780.00
- Ø 100 mm Butterfly fl - fl lengkap Pneumatic unit 6.000 85,800.00 514,800.00
- Ø 100 mm Flange las unit 35.000 215,392.38 7,538,733.13
- Ø 50 mm Steel Pipa Sch 40 unit 69.000 87,168.40 6,014,619.60
- Ø 50 mm x 90 Steel Bend all flange unit 18.000 87,277.91 1,571,002.29
- M16 Baud mur set 280.000 892.38 249,865.00
7 Blower / Air Compressor pencucian
Blower pencucian, Pressure: 35 m', Kap: 4,47 m3/min
- 1030 rpm, 18,5 kW, 3 phase, unit 2.000 11,509,161.84 23,018,323.68
size 125 mm, dilengkapi safety valve
Air Compressor, P = 10kg/cm2, Q = m3/hr, dilengkapi
tangki kapasitas 3000 lt, pressure switch, pressure
- set 2.000 7,672,774.56 15,345,549.12
indikator, safety valve, air dryer, air drain, dan
perpipaan, Motor 18,5kW

Pompa backwash type centrifugal, Q = 50 L/d, Daya


- unit 2.000 728,706.00 1,457,412.00
motor, P = 7,5 kW, eff. Min 85%, 4P 50 Hz, 1450 rpm
Perpipaan Tubing Pollyeurthan tube 8mm , Nepple For
- Ls 1.000 85,800,000.00 85,800,000.00
selenoid + Material support
8 Perpipaan Air Wash
- Ø 150 mm Steel Pipa Sch. 40 m' 30.000 9,165.90 274,977.12
- Ø 150 mm x 90 Steel Bend all flange unit 9.000 84,634.00 761,706.00
- Ø 150 mm x Ø 100 mm Steel Tee all flange unit 5.000 84,221.50 421,107.50
- Ø 150 mm Butterfly fl - fl lengkap Pneumatic unit 6.000 214,357.00 1,286,142.00
- Ø 150 mm Flange las unit 20.000 292,717.57 5,854,351.36
- Ø 200 mm Steel Pipa Sch. 40 unit 8.000 12,286.29 98,290.28
- Ø 300 mm Steel Pipa Sch. 40 unit 13.000 196,303.35 2,551,943.54
- Ø 200 mm Butterfly fl - fl lengkap Pneumatic unit 6.000 214,901.50 1,289,409.00
- Ø 300 mm Blange Flange unit 1.000 521,723.13 521,723.13
- Ø 300 mm x Ø 200 mm Steel Tee all flange unit 6.000 129,827.50 778,965.00
- Ø 200 mm x 90 Steel Bend fl-fl unit 8.000 87,609.50 700,876.00
- Reducer Ø 300 mm - Ø 200 mm unit 1.000 129,827.50 129,827.50
- Ø 200 mm Flange las unit 35.000 367,518.25 12,863,138.75
- Ø 300 mm Flange las unit 1.000 521,723.13 521,723.13
- Ø 200 mm Karet Packing unit 35.000 1,561.66 54,657.97
- Ø 300 mm Karet Packing unit 1.000 1,561.66 1,561.66
- M24 Baud Mur set 24.000 892.38 21,417.00
- M20 Baud Mur set 420.000 892.38 374,797.50
Jumlah 446,211,757.07
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
Pengadaan elektrikal dan aksesoris
1 Panel Utama Filter dan Kontrol pencucian (M-FL)
- Box Panel unit 1.000 3,850,000.00 3,850,000.00
- Bus Bar 3P+N/1205A +PE dan acessories set 1.000 1,615,320.96 1,615,320.96
MCCB 3P(252-630)A 50KA + Micrologic 2,0 manually
- set 1.000 8,026,150.00 8,026,150.00
operated
- MCCB 3P(100-125)A 36KA + electronic trip set 1.000 3,647,394.73 3,647,394.73
- MCCB 3P(80-100)A 25KA + electronic trip set 1.000 3,647,394.73 3,647,394.73
- MCB 3P/16A, 10A unit 1.000 190,129.50 190,129.50
- MCB 3P/25A 10A unit 3.000 190,129.50 570,388.50
- MCB 2P/20A 10A unit 1.000 117,568.00 117,568.00
DOL Starting Motor 0.55kW, 3 komponen, type high
- set 60.000 499,290.00 29,957,400.00
performance
- Contactor 3P, 9A, AC3, 380 V unit 60.000 139,700.00 8,382,000.00
- Voltmeter (0-500)V, Uk 72x72 unit 1.000 224,400.00 224,400.00
- VS (Voltage Selector switch, 7 posisi) unit 1.000 126,500.00 126,500.00
- MCB 1P/4A 6A unit 24.000 40,414.00 969,936.00
- Sequence control relay (auxiliary relay) dan kelengkapan LS 1.000 2,422,981.00 2,422,981.00
2 Panel Meja Kontrol Filter (MCD-FL)
- Box Panel unit 1.000 3,850,000.00 3,850,000.00
- MCB 1P/4A 6A unit 12.000 40,414.00 484,968.00
Plug relay 220V, 14 pin, 4 kontak C/O, 5 amp, built in
- unit 60.000 46,750.00 2,805,000.00
pilot light komplit dengan dudukan
- Pilot lamp, Ø 22 mm plastic 220-240 VAC unit 12.000 8,800.00 105,600.00
- Push button Ø 22 mm flush, plastic (reset) unit 2.000 42,900.00 85,800.00
- Push button Ø 22 mm, plastic 220-240 VAC unit 120.000 42,900.00 5,148,000.00
Local Control panel sludge drain valve (LCP-SD 1/2,…LCP-SD-
3
SD10)
Local control panel, type metal (zinc alloy), IP 65, 4
- lubang komlit pust button start-stop, ukuran 80 x LS 6.000 5,169,071.07 31,014,426.43
130mm
4 Panel Kontrol Blower Pencucian (PC-BWR)
- Box Panel unit 1.000 3,850,000.00 3,850,000.00
- Bus Bar 3P+N/205A +PE dan acessories set 1.000 1,615,320.96 1,615,320.96
- MCCB 3P(100-125)A 36KA + electronic trip set 1.000 2,162,050.00 2,162,050.00
- MCB 3P/25A 10A unit 2.000 190,129.50 380,259.00
- MCB 2P/16A 10A unit 1.000 117,568.00 117,568.00
- MCB 4P/20A 10A unit 1.000 253,506.00 253,506.00
DOL Starting Motor 0.55kW, 3 komponen, type high
- set 60.000 499,290.00 29,957,400.00
performance
- Contactor 3P, 9A, AC3, 380 V unit 60.000 139,700.00 8,382,000.00
- Voltmeter (0-500)V, Uk 72x72 unit 1.000 224,400.00 224,400.00
- VS (Voltage Selector switch, 7 posisi) unit 1.000 126,500.00 126,500.00
- MCB 1P/4A 6A unit 1.000 40,414.00 40,414.00
Relay arus bocor (Modul Vigi) 4P, 40A, Sensitifitas =
- unit 1.000 269,500.00 269,500.00
300 mA
- Voltmeter (0-500)V, Uk 72x72 unit 1.000 224,400.00 224,400.00
- VS (Voltage Selector switch, 7 posisi) unit 1.000 126,500.00 126,500.00
- Amperemeter 3P/0-50A unit 4.000 56,100.00 224,400.00
- CT 50/5 unit 4.000 219,120.00 876,480.00
Star delta Starting Motor 18,5 kW, 3 komponen, type
- set 4.000 323,064.19 1,292,256.77
high performance
- (Kordinasi Type 2), terdiri dari :
Fuse carrier (STI), 2P(1P+N), lengkap denan tabung sedring (fuse catrige), type aM,
- set 4.000 282,681.17 1,130,724.67
Ukuran 10,3x38mm, 2A, 500V, 80kA
- Buzzer, 70 dBA unit 1.000 20,350.00 20,350.00
- Hour counter 220V unit 4.000 218,068.33 872,273.34
RCP (Relay Control Phase) untuk unbalanced/missing
- phase 2 kontak output C/O, Delay unit 4.000 502,364.82 2,009,459.28
(0.1-10) detik, (380-500)V
Plug in relay 220V, 14 pin, 4 kontak C/O, 5 amp, built
- unit 8.000 46,750.00 374,000.00
in pilot light, komplit dengan dudukan
- Pilot lamp, Ø 22 mm plastic 220-240 VAC unit 7.000 8,800.00 61,600.00
- Push button Ø 22 mm flush, plastic (reset) unit 2.000 42,900.00 85,800.00
- Push button Ø 22 mm, plastic 220-240 VAC unit 8.000 42,900.00 343,200.00
Plug dan Socket 2P+E, 16A, 220 VAC, Panel mounted
- set 1.000 237,452.18 237,452.18
komplit
Plug dan Socket 3P+N+E, 16A, 380 VAC, Panel
- set 1.000 237,452.18 237,452.18
mounted komplit
5 Panel Ruang Pompa Air Cuci Filter (PP-BW)
Box Plastic mini pragma pintu tranparant, inbow, 24
- unit 1.000 297,880.00 297,880.00
modul
- MCB 3P/16A 10 KA unit 1.000 190,129.50 190,129.50
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- RCCB/ELCB, 4P, 25A, Sensitifitas : 30 mA unit 1.000 568,551.50 568,551.50
- MCB 1P/6A 6 KA unit 3.000 40,414.00 121,242.00
- MCB 1P/10A 6 KA unit 4.000 40,414.00 161,656.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
6 Panel Ruang Blower (PP-BWR)
Box Plastic mini pragma pintu tranparant, inbow, 24
- unit 1.000 297,880.00 297,880.00
modul
- MCB 3P/16A 10 KA unit 1.000 190,129.50 190,129.50
- RCCB/ELCB, 4P, 25A, Sensitifitas : 30 mA unit 1.000 568,551.50 568,551.50
- MCB 1P/6A 6 KA unit 3.000 40,414.00 121,242.00
- MCB 1P/10A 6 KA unit 4.000 40,414.00 161,656.00
7 Panel Lampu Luar Filter (PP-LR 2)
- Box Panel outdoor type unit 1.000 269,500.00 269,500.00
- MCB 3P/32A 6 KA unit 1.000 190,129.50 190,129.50
- Contactor, 3P, 32 A AC1, 380 V unit 2.000 396,550.00 793,100.00
- Photo cell unit 1.000 96,919.26 96,919.26
- MCB 3P/16A 6 KA unit 3.000 190,129.50 570,388.50
- Push button dia. 22 mm, plastic 220-240 VAC unit 4.000 42,900.00 171,600.00
8 Penerangan Ruang Filter
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 10.000 396,000.00 3,960,000.00
- Lampu Phillips 2 x 36W/220V, WP (water proof) unit 12.000 528,000.00 6,336,000.00
- Single switch 10 A/ 220V plano unit 8.000 18,700.00 149,600.00
- Double Switch 10 A/ 220V plano unit 5.000 23,100.00 115,500.00
- Outlet 10A/2P+E, 220V, WP (water proof) unit 4.000 253,605.40 1,014,421.58
- Kabel NYM 3 x 2,5 mm2 m 250.000 14,300.00 3,575,000.00
- uPVC Conduit 20 mm m 220.000 8,635.00 1,899,700.00
- uPVC Conduit 25 mm m 2.000 17,600.00 35,200.00
Exhaust fan, Industrial type, wall mounted, 16", komplit
- set 4.000 583,000.00 2,332,000.00
base frame
9 Penerangan Ruang Blower Pencucian
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 8.000 396,000.00 3,168,000.00
- Single switch 10 A/ 220V plano unit 4.000 18,700.00 74,800.00
- Double Switch 10 A/ 220V plano unit 2.000 23,100.00 46,200.00
- Outlet 10A/2P+E, 220V, WP (water proof) unit 1.000 253,605.40 253,605.40
- Kabel NYM 3 x 2,5 mm2 m 50.000 14,300.00 715,000.00
- uPVC Conduit 20 mm m 45.000 8,635.00 388,575.00
- uPVC Conduit 25 mm m 2.000 17,600.00 35,200.00
Exhaust fan, Industrial type, wall mounted, 16", komplit
- set 1.000 583,000.00 583,000.00
base frame

10 Penangkal Petir Bangunan IPA - Filter

- Penangkal Petir type Elctrode dengan Rmin = 60m LS 1.000 10,822,650.43 10,822,650.43

- BC 50 mm2 m 70.000 54,450.00 3,811,500.00


- Clamp BC, 50 mm2 unit 390.000 40,383.02 15,749,379.36
- Air terminal Ø 1, termasuk dudukan, komplit set 4.000 686,511.41 2,746,045.63
- GIP Ø 2 termasuk socket set 4.000 662,281.60 2,649,126.39
- Grounding rod 3/4 set 4.000 282,681.17 1,130,724.67
- Pipa PVC Ø 1, termasuk clamp set 8.000 290,757.78 2,326,062.20
- Box control 30x30x70 cm LS 2.000 848,043.50 1,696,087.01
11 Instalasi Penerangan
- Lampu Mercury 250 watt Sorot unit 2.000 154,000.00 308,000.00
- Lampu Mercury 250 watt Sorot unit 2.000 154,000.00 308,000.00
- Kabel dari P. Penerangan R. Kimia ke Disconecting Switch
- - NYFGBY 4 x 2,5 mm2 meter 75.000 72,380.00 5,428,500.00
- Kabel dari DS ke lampu2 - -
- - NYY 3 x 2,5 mm2 meter 40.000 35,420.00 1,416,800.00
- Pipa PVC 20mm meter 40.000 17,556.00 702,240.00
- Disconecting switch Outdoor Type unit 1.000 1,232,000.00 1,232,000.00
12 Panel Lokal Valve Sedimentasi
Panel Lokal Filter Outdoor type double door dengan
- unit 2.000 5,390,000.00 10,780,000.00
support
- Selenoid valve + manifold 6 selenoid (by others)
Plug in relay 220V, 14 pin, 4 kontak C/O, 5 amp, built
- unit 6.000 46,750.00 280,500.00
in pilot light, komplit dengan dudukan
- Illuminated Push Button Green, 220VAC unit 6.000 475,860.00 2,855,160.00
- Illuminated Push Button Red, 220VAC unit 6.000 475,860.00 2,855,160.00
- Selector Switch 3 Posisi unit 6.000 342,034.00 2,052,204.00
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.000 807,660.48 807,660.48
Jumlah 262,146,781.64
-
Pemasangan elektrikal dan aksesoris
1 Panel Utama Filter dan Kontrol pencucian (M-FL)

- Perakitan dan Pemasangan lengkap termasuk aksesoris set 1.000 807,660.48 807,660.48
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
2 Panel Meja Kontrol Filter (MCD-FL)

- Perakitan dan Pemasangan lengkap termasuk aksesoris set 1.000 807,660.48 807,660.48
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
3 Local Control panel sludge drain valve (LCP-SD 1/2,…LCP-SD-SD10)

- Perakitan dan Pemasangan lengkap termasuk aksesoris set 1.000 807,660.48 807,660.48

4 Panel Kontrol Blower Pencucian (PC-BWR)

- Perakitan dan Pemasangan lengkap termasuk aksesoris set 1.000 807,660.48 807,660.48

5 Panel Ruang Pompa Air Cuci Filter (PP-BW)

- Perakitan dan Pemasangan lengkap termasuk aksesoris set 1.000 807,660.48 807,660.48

6 Panel Ruang Blower (PP-BWR)

- Perakitan dan Pemasangan lengkap termasuk aksesoris set 1.000 807,660.48 807,660.48

7 Panel Lampu Luar Filter (PP-LR 2)

- Perakitan dan Pemasangan lengkap termasuk aksesoris set 1.000 807,660.48 807,660.48

8 Penerangan Ruang Filter


- Lampu philips 2 x 18W/220V, WP (Water proof) unit 10.000 40,370.00 403,700.00
- Lampu Phillips 2 x 36W/220V, WP (water proof) unit 12.000 40,370.00 484,440.00
- Outlet 10A/2P+E, 220V, WP (water proof) unit 4.000 24,200.00 96,800.00
Exhaust fan, Industrial type, wall mounted, 16", komplit
- set 4.000 242,220.00 968,880.00
base frame
- Titik Lampu titik 22.000 72,689.44 1,599,167.70
9 Penerangan Ruang Blower Pencucian
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 8.000 40,370.00 322,960.00
- Outlet 10A/2P+E, 220V, WP (water proof) unit 1.000 24,200.00 24,200.00
Exhaust fan, Industrial type, wall mounted, 16", komplit
- set 1.000 242,220.00 242,220.00
base frame
- Titik Lampu titik 8.000 72,689.44 581,515.53
10 Penangkal Petir Bangunan IPA - Filter

- Perakitan dan Pemasangan lengkap termasuk aksesoris set 1.000 807,660.48 807,660.48

Jumlah 11,185,167.07

- PEKERJAAN MEKANIKAL DAN ELEKTRIKAL BANGUNAN KIMIA DAN CHLORINE 4,294,133,669.20


a Pengadaan Mekanikal dan aksesoris
1 Crane untuk Ruang Kimia -
Electric Motor Hoist crane, Kapasitas 1 ton, lengkap
- dengan span, flat bar, conductor dan pendant push button set 1.00 41,694,048.00 41,694,048.00
( R.Kimia )

Electric Motor Hoist crane, Kapasitas 2 ton, lengkap


- dengan span, flat bar, conductor dan pendant push set 1.00 45,424,896.00 45,424,896.00
button ( R. Chlor )
2 Pompa Dosing dan pengaduk - - -
Mixer 580 rpm, Drive: 4kW, 380V, dilengkapi dengan
- gear, reducer, stainless steel shaft set 4.00 56,536,233.60 226,144,934.40
support, control dan drain oil.
Pompa dozing alum Q = 250 l/jam; P=6,9 bar, Motor =
- unit 3.00 24,229,814.40 72,689,443.20
1,1kW, 380V, 3 phase
Pompa dosing soda ash Q = 450l/jam; P = 6,9 bar,
- unit 3.00 24,229,814.40 72,689,443.20
Motor = 0,55kW, 380V, 3 phase
- IWF Baja 150 x 300 mm Kg 910.16 - -
Jumlah 458,642,764.80
b Pemasangan mekanikal dan aksesoris
1 Crane untuk Ruang Kimia
Electric Motor Hoist crane, Kapasitas 1 ton, lengkap
- dengan span, flat bar, conductor dan pendant push button set 1.00 4,038,302.40 4,038,302.40
( R.Kimia )

Electric Motor Hoist crane, Kapasitas 2 ton, lengkap


- dengan span, flat bar, conductor dan pendant push set 1.00 5,922,843.52 5,922,843.52
button ( R. Chlor )
2 Pompa Dosing dan pengaduk
Mixer 580 rpm, Drive: 4kW, 380V, dilengkapi dengan
- gear, reducer, stainless steel shaft set 4.00 3,230,641.92 12,922,567.68
support, control dan drain oil.
Pompa dozing alum Q = 250 l/jam; P=6,9 bar, Motor =
- unit 3.00 1,938,385.15 5,815,155.46
1,1kW, 380V, 3 phase
Pompa dosing soda ash Q = 450l/jam; P = 6,9 bar,
- unit 3.00 1,938,385.15 5,815,155.46
Motor = 0,55kW, 380V, 3 phase
Jumlah 34,514,024.51
c Pengadaan Elektrikal dan aksesoris
1 Panel utama / control Pompa Dosing Kimia (M-PK)
- Box Panel Pompa Air Bersih unit 1.00 3,850,000.00 3,850,000.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Bus Bar 3P+N/125A +PE dan acessories set 1.00 1,615,320.96 1,615,320.96
- MCCB 3P(100-125)A 36KA + electronic trip set 1.00 3,647,394.73 3,647,394.73
MCCB 3P(252-630)A 50KA + Micrologic 2,0 manually
- set 1.00 10,525,431.40 10,525,431.40
operated
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- MCB 2P/25 A, 10 KA unit 2.00 117,568.00 235,136.00
- MCB 2P/16 A, 10 KA unit 1.00 117,568.00 117,568.00
- MCB 4P/20 A, 10 KA unit 1.00 253,506.00 253,506.00
Relay arus bocor (Modul Vigi) 4P, 40A, Sensitivitas =
- unit 1.00 269,500.00 269,500.00
300 mA
- MCB 3P/20 A, 10 KA unit 1.00 190,129.50 190,129.50
- MCB 3P/25 A, 10 KA unit 1.00 190,129.50 190,129.50
- Isolating switch, 380 V, 3P, 40A unit 2.00 436,136.66 872,273.31
- Voltmeter (0-500)V, Uk 72x72 unit 1.00 224,400.00 224,400.00
- VS (Voltage Selector switch, 7 posisi) unit 1.00 126,500.00 126,500.00
DOL Starting Motor 0.55kW, 3 komponen, type high
- set 4.00 499,290.00 1,997,160.00
performance
DOL Starting Motor 1.1 kW, 3 komponen, type high
- set 4.00 499,290.00 1,997,160.00
performance
DOL Starting Motor 4 kW, 3 komponen, type high
- set 4.00 653,070.00 2,612,280.00
performance
Fuse carrier (STI), 2P (1P + N), lengkap dengan tabung
- sekring (fuse catrige), type aM, Ukuran 10,3x38mm, 2A, set 12.00 305,295.66 3,663,547.93
500V, 80kA
- Buzzer, 70 dBA unit 1.00 20,350.00 20,350.00
RCP (Relay Control Phase) untuk unbalanced/missing
- phase 2 kontak output C/O, Delay (0.1-10) detik, (380- unit 2.00 502,364.82 1,004,729.64
500)V
Plug in relay 220V, 14 pin, 4 kontak C/O, 5 amp, built
- unit 24.00 46,750.00 1,122,000.00
in pilot light, komplit dengan dudukan
- Water Level Control (WLC), Time delay (0.1-10)detik, se unit 4.00 330,000.00 1,320,000.00
- Pilot lamp, Ø 22 mm plastic 220-240 VAC unit 36.00 8,800.00 316,800.00
- Push button Ø 22 mm flush, plastic (reset) unit 2.00 42,900.00 85,800.00
Plug dan Socket 2P + E 16A, 220 VAC, Panel
- set 1.00 237,452.18 237,452.18
mounted, komplit
Plug dan Socket 3P + N + E 16A, 380 VAC, Panel
- set 1.00 237,452.18 237,452.18
mounted, komplit

- Box Plate metal, 2100x800x600 mm, Floor Standing Unit 1.00 12,684,980.00 12,684,980.00

- MCCB 3 POLE, 250 A Unit 1.00 10,876,250.00 10,876,250.00


- MCCB 3 POLE, 80 A Unit 1.00 2,203,740.00 2,203,740.00
- MCB 3 POLE, 6 A Unit 8.00 1,315,776.00 10,526,208.00
- MCB 3 POLE, 10 A Unit 4.00 1,315,776.00 5,263,104.00
- MCB 2 POLE, 6 A Unit 2.00 982,058.00 1,964,116.00
- MCB 1P/6A 6 KA Unit 3.00 40,414.00 121,242.00
- Indicator Lamp R, S, T Unit 3.00 63,140.00 189,420.00
Fuse carrier (STI), 2P (1P + N), lengkap dengan tabung
- sekring (fuse catrige), type aM, Ukuran 10,3x38mm, 2A, Unit 3.00 305,295.66 915,886.98
500V, 80kA
- Current Transformator 250/5 A Unit 3.00 833,294.00 2,499,882.00
- Contacor LC1D09 Unit 12.00 321,860.00 3,862,320.00
- Thermal Overload LRD06 Unit 4.00 975,282.00 3,901,128.00
- VSD 380/3P Unit 8.00 13,090,000.00 104,720,000.00
- Power Supply DC 220VAC / 24VDC 10A Unit 1.00 6,012,930.00 6,012,930.00
- Illuminated Push Button Red, 220VAC Unit 14.00 475,860.00 6,662,040.00
- Illuminated Push Button Green, 220VAC Unit 14.00 475,860.00 6,662,040.00
- Indicator Lamp Yellow, 220VAC Unit 14.00 63,140.00 883,960.00
- Push Button Unit 1.00 63,140.00 63,140.00
- Buzzer, 70 dBA Unit 1.00 20,350.00 20,350.00
- Emergency Stop Unit 1.00 396,242.00 396,242.00
Plug in relay 220V, 14 pin, 4 kontak C/O, 5 amp, built
- Unit 24.00 46,750.00 1,122,000.00
in pilot light, komplit dengan dudukan
- Exhaust Fan 6" Unit 2.00 2,885,344.00 5,770,688.00
- Dust Filter Unit 4.00 634,942.00 2,539,768.00
- Perakitan dan Pemasangan lengkap termasuk aksesoris Unit 1.00 807,660.48 807,660.48

2 Panel Penerangan Ruang Kimia (PP-RK)


Box Plastic mini pragma pintu tranparant, inbow, 24
- unit 1.00 297,880.00 297,880.00
modul
- MCB 3P/16A 10 KA unit 1.00 190,129.50 190,129.50
- RCCB/ELCB, 4P, 25A, Sensitifitas : 30 mA unit 1.00 568,551.50 568,551.50
- MCB 1P/6A 6 KA unit 3.00 40,414.00 121,242.00
- MCB 1P/10A 6 KA unit 1.00 40,414.00 40,414.00

- Box Plate metal, 600x500x200 mm, Wall Mounting unit 1.00 4,620,000.00 4,620,000.00

- MCB 3P/6A, 6 KA unit 1.00 1,315,776.00 1,315,776.00


- RCCB/ELCB, 4P, 10A, Sensitifitas : 30 mA unit 1.00 930,160.00 930,160.00
- MCB 1P/4A 6 KA unit 5.00 161,700.00 808,500.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- MCB 1P/6A 6 KA unit 1.00 40,414.00 40,414.00
- MCB 3P/4A 6 KA unit 1.00 1,547,700.00 1,547,700.00
- Time Switch 24 Jam unit 1.00 1,319,472.00 1,319,472.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Magnetic Contactor 10A unit 1.00 1,391,852.00 1,391,852.00
- Indicator Lamp R, S, T unit 3.00 63,140.00 189,420.00
- Mini Fuse 2A unit 4.00 140,756.00 563,024.00
- Selector Switch 3 Posisi unit 1.00 342,034.00 342,034.00
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 807,660.48 807,660.48

3 Penerangan Ruang Kimia


- Lampu philips 2 x 18W/220V, WP (Water proof) unit 15.00 396,000.00 5,940,000.00
- Single switch 10 A/ 220V plano unit 6.00 18,700.00 112,200.00
- Double Switch 10 A/ 220V plano unit 3.00 23,100.00 69,300.00
- Outlet 10A/2P+E, 220V, WP (water proof) unit 3.00 253,605.40 760,816.19
- Kabel NYM 3 x 2,5 mm2 m 100.00 14,300.00 1,430,000.00
- uPVC Conduit 20 mm m 75.00 8,635.00 647,625.00
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
- Lampu TL WP 2 X 18 watt Unit 12.00 65,450.00 785,400.00
- Lampu TL WP 2 X 36 watt Unit 14.00 65,450.00 916,300.00
- Lampu DL 1 X 20watt Unit 1.00 65,450.00 65,450.00
- Outlet 10 A/2P+E 220V Unit 1.00 170,940.00 170,940.00
- Stop kontak AC Unit 1.00 38,500.00 38,500.00
- Double Switch 10 A/ 220V plano Unit 4.00 23,100.00 92,400.00
- Single switch 10 A/ 220V plano Unit 2.00 18,700.00 37,400.00
- Instalasi titik lampu Titik 27.00 589,050.00 15,904,350.00
- Instalasi stop kontak Titik 2.00 392,700.00 785,400.00
- Kabel dari Panel Penerangan R. Kimia ke P. Kimia
- - NYY 4 x 2,5 mm2 meter 10.00 52,360.00 523,600.00
- - BC 4 mm2 meter 10.00 31,416.00 314,160.00
4 Penangkal Petir Bangunan Kimia
- Penangkal Petir type Elctrode dengan Rmin = 60m LS 1.00 10,822,650.43 10,822,650.43
- BC 50 mm2 m 82.00 54,450.00 4,464,900.00
- Clamp BC, 50 mm2 unit 425.00 40,383.02 17,162,785.20
- Air terminal Ø 1, termasuk dudukan, komplit set 12.00 686,511.41 8,238,136.90
- GIP Ø 2 termasuk socket set 4.00 662,281.60 2,649,126.39
- Grounding rod 3/4 set 4.00 282,681.17 1,130,724.67
- Grounding rod 3/4 set 1.00 282,681.17 282,681.17
- Pipa PVC Ø 1, termasuk clamp set 4.00 290,757.78 1,163,031.10
- Box control 30x30x70 cm LS 1.00 848,043.50 848,043.50
- - NYA 50 mm2 meter 30.00 150,150.00 4,504,500.00
- GIP Ø 3 termasuk socket meter 1.00 770,000.00 770,000.00
5 Peralatan elektroklorinasi
Onsite Chlorine Disinfectant Generator kap. 4 kg.Cl/jam,
- termasuk sel elektroda, power module, dan terminal Unit 1.00 2,435,400,000.00 2,435,400,000.00
control

- Inline water filter kap. 4 m3/jam, tekanan kerja 3-6 bar Unit 1.00 42,240,000.00 42,240,000.00

- Water softener dg hardness monitoring system Unit 1.00 17,600,000.00 17,600,000.00


- Water chiller system, termasuk power control Unit 1.00 105,600,000.00 105,600,000.00
Submersible pump kap. 2500 L/jam, tekanan 5 bar,
- Unit 1.00 35,200,000.00 35,200,000.00
termasuk power control

HDPE Brine tank kap. 4 m3, termasuk drain, corong inlet


- garam, soft water inlet with automated magnetic valve, Unit 1.00 35,200,000.00 35,200,000.00
brine outlet, overflow

HDPE brine tnak kap. 0,5 m3, termasuk inlet, outlet,


- Unit 1.00 8,800,000.00 8,800,000.00
drain, dan overflow

Brine dosing pump, kap. Min. 100 L/jam, tekanan 5 bar,


- termasuk control panel, push button, indicator light, Unit 2.00 52,800,000.00 105,600,000.00
integrated control ready

HDPE Production tank 30 m3, dilengkapi dengan water


- Unit 1.00 457,600,000.00 457,600,000.00
level sensor
- Power stabiliser kap. 30 kVA Unit 1.00 17,160,000.00 17,160,000.00
Jumlah 3,583,560,966.83
d Pemasangan Elektrikal dan aksesoris
1 Panel utama / control Pompa Dosing Kimia (M-PK)

- Perakitan dan Pemasangan lengkap termasuk aksesoris set 1.00 807,660.48 807,660.48

2 Panel Penerangan Ruang Kimia (PP-RK)

- Perakitan dan Pemasangan lengkap termasuk aksesoris set 1.00 807,660.48 807,660.48

3 Penerangan Ruang Kimia


- Lampu philips 2 x 18W/220V, WP (Water proof) unit 15.00 40,370.00 605,550.00
- Outlet 10A/2P+E, 220V, WP (water proof) unit 3.00 24,200.00 72,600.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
Exhaust fan, Industrial type, wall mounted, 16", komplit
- set 2.00 242,220.00 484,440.00
base frame
- Titik Lampu titik 15.00 72,689.44 1,090,341.62
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
4 Penangkal Petir Bangunan Kimia

- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 807,660.48 807,660.48

5 Peralatan elektroklorinasi
- Pemasangan perpipaan sistem elektroklorinasi LS 1.00 11,220,000.00 11,220,000.00
- Pemasangan pengkabelan sistem elektroklorinasi LS 1.00 22,000,000.00 22,000,000.00
- Pemasangan sistem pembubuhan larutan klorin LS 1.00 105,600,000.00 105,600,000.00
Pemrograman sistem kendali setempat dan kendali jarak
- LS 1.00 49,280,000.00 49,280,000.00
jauh, berikut piranti lunak

Pengujian komisioning dan pelatihan minimal 5 hari,


- LS 1.00 24,640,000.00 24,640,000.00
termasuk dokumentasi dan manual operasi pemeliharaan

Jumlah 217,415,913.06

- PEKERJAAN MEKANIKAL DAN ELEKTRIKAL BANGUNAN GENSET #REF!


a Pengadaan dan Pemasangan Mekanikal dan Accessories

Generator set, Kapasitas: 500 kW, 380/220V, komplit tangki harian


1 dengan perpipaan, kontrol panel PCC, karet peredam getaran, set 1 2,656,996,472.62 2,656,996,472.62
peredam suara dan kelengkapan lainnya (Lihat spesifikasi khusus)

Fuel Storage tank procurement cap. of 5.000 lt termasuk Suporting


2 material, termasuk perpipaan, strainer, level switch pada control unit 1 123,572,053.44 123,572,053.44
panel bahan bakar, pompa tangan, electric pump dll.
Pengadaan dan pemasangan Rock Wool, tebal 5cm (2") pada
dinding dalam Ruangan, Kawat anyaman galvanized untuk
3 pelindung bahan Glass wool dan kain pembungkus tahan api m2 135.55 383,638.73 52,002,229.58
Generator set, lengkap dengan pelidung kain Catton tebal dan kawat
Ram.
Jumlah 2,832,570,755.64
c Pengadaan Elektrikal dan Accessories
1 Trafo dan panel TM
- Trafo 800 kVA, 20kV/380-220V, Dyn 5, dan kelengkapan set 1.00 220,788,730.00 220,788,730.00
Panel Tegangan Menengah (cubicle) 800kVA, 24 kV,
- set
incoming dan outgoing with circuit breaker 1.00 626,067,360.00 626,067,360.00
2 Panel Automatic Main Failure (AMF) dan Change Over Switch (COS)
Panel Automatic Main Failure untuk Genset Cap 500
- 1.00 444,213,264.00
KvA, dengan PCC set 444,213,264.00
Change Over Switch untuk kapasitas daya 1500 KvA,
- 1.00
plus interlock system set 6,970,109.94 6,970,109.94
- Box Panel, ukuran T:1800 X L:800 X D:600, free standing set 1.00 3,850,000.00 3,850,000.00
3 Panel Induk Utama, LVM-DP
- Box Plate metal, 2000x(800+800+800)x1000 mm, Floor S unit 1.00 3,850,000.00 3,850,000.00
- Bus Bar 3P+N/2000A + PE dan accessories set 1.00 6,978,186.55 6,978,186.55
ACB 4P/(640-2000)A 50KA (Min) dilengkapi dengan
- unit trip Motor mechanism module 220/240V AC dan set 1.00 9,058,500.00 9,058,500.00
kontak-kontak bantu (Lihat spek khusus)

- MCCB 4P(25-40)A 25KA + electronic trip ke Kantor peng set 1.00 2,162,050.00 2,162,050.00
- MCCB 3P(13-16)A 25KA + electronic trip ke PP. R Gens set 1.00 2,162,050.00 2,162,050.00
- Pilot lamp, Ø 22mm, plastic 220-240 VAC set 8.00 8,800.00 70,400.00
- Push button modular plastic 220-240 VAC set 4.00 42,900.00 171,600.00
Accessories penunjang termasuk relay bantu, isolator
- kabel-kabel, terminal, fuse, ls 1.00 1,211,490.72 1,211,490.72
supporting fanel dll sebagai pelengkap system
- Kapasitor bank, komplit lamp, push button (500 kvar) set 1.00 250,232,730.00 250,232,730.00
- MCCB 3 POLE, 1000 A Unit 1.00 46,200,000.00 46,200,000.00
- MCCB 3 POLE, 160 A Unit 1.00 10,876,250.00 10,876,250.00
- MCB 1P/6A 6 KA Unit 6.00 40,414.00 242,484.00
- Mini Fuse Unit 6.00 140,756.00 844,536.00
Plug in relay 220V, 14 pin, 4 kontak C/O, 5 amp, built
- Unit 10.00 46,750.00 467,500.00
in pilot light, komplit dengan dudukan
- Indikator Lamp, Pilot Lamp Ø22mm, 220V Unit 8.00 77,000.00 616,000.00
- Illuminated Push Button, 220VAC Unit 4.00 475,860.00 1,903,440.00
- Power Meter Digital Unit 1.00 1,848,000.00 1,848,000.00
- Current Transformator 2000/5A Unit 6.00 4,383,918.00 26,303,508.00
- Selector Switch 3 Posisi Unit 2.00 342,034.00 684,068.00
- Box Plate metal, 500 x 400 200 mm, Wall Mounting Unit 1.00 3,518,592.00 3,518,592.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
4 Panel Penerangan Ruang Listrik Utama (PP-RL)
- Box Plastic mini pragma pintu tranparant, inbow, 24 modu unit 1.00 297,880.00 297,880.00
- MCB 3P/16A 10 KA unit 1.00 190,129.50 190,129.50
- RCCB/ELCB, 4P, 25A, Sensitifitas : 30 mA unit 1.00 568,551.50 568,551.50
- MCB 1P/6A 6 KA unit 3.00 40,414.00 121,242.00
- MCB 1P/10A 6 KA unit 4.00 40,414.00 161,656.00
- Box Plate metal, 600x500x200 mm, Wall Mounting unit 1.00 4,620,000.00 4,620,000.00
- MCB 3P/6A, 6 KA unit 1.00 1,315,776.00 1,315,776.00
- RCCB/ELCB, 4P, 10A, Sensitifitas : 30 mA unit 1.00 930,160.00 930,160.00
- MCB 1P/4A 6 KA unit 15.00 161,700.00 2,425,500.00
- Time Switch 24 Jam unit 1.00 1,319,472.00 1,319,472.00
- Magnetic Contactor 10A unit 1.00 1,391,852.00 1,391,852.00
- Indikator Lamp, Pilot Lamp Ø22mm, 220V unit 3.00 77,000.00 231,000.00
- Mini Fuse 2A unit 3.00 140,756.00 422,268.00
- Selector Switch 3 Posisi unit 1.00 342,034.00 342,034.00
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 807,660.48 807,660.48
5 Penerangan Ruang listrik utama
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 8.00 396,000.00 3,168,000.00
- Lampu philips 36W/220V, Industrial Type unit 1.00 284,296.49 284,296.49
- Lampu philips 2 x 36W/220V, Water proof unit 4.00 528,000.00 2,112,000.00
- Single switch 10 A/ 220V plano unit 6.00 18,700.00 112,200.00
- Double Switch 10 A/ 220V plano unit 2.00 23,100.00 46,200.00
- Outlet 10A / 220 V unit 2.00 92,073.30 184,146.60
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 2.00 253,605.40 507,210.79
- Kabel NYM 3 x 2,5 mm2 m 160.00 14,300.00 2,288,000.00
- uPVC Conduit 20 m m 140.00 8,635.00 1,208,900.00
- uPVC Conduit 25 m m 2.00 17,600.00 35,200.00
- Exhaust fan, Industrial type, wall mounted, 16", komplit b set 2.00 583,000.00 1,166,000.00
- Lampu TL / DL 2 X 18 watt unit 21.00 65,450.00 1,374,450.00
- Lampu PJU, 56 watt + timer unit 30.00 77,000.00 2,310,000.00
- Outlet 10 A/2P+E 220V unit 4.00 170,940.00 683,760.00
- Double Switch 10 A/ 220V plano unit 4.00 23,100.00 92,400.00
- Exhaust Fan 16 Inch, 80 watt ( 2 unit di R. panel LVMDP unit 5.00 1,707,860.00 8,539,300.00
- Kabel penerangan ke PJU
- - NYFGBY 2 x 4 mm2 meter 612.00 43,274.00 26,483,688.00
- Kabel penerangan ke PJU
- - NYFGBY 2 x 2,5 mm2 meter 163.00 40,348.00 6,576,724.00
- Kabel dari LVMDP ke P. Penerangan R. Genset
- NYFGBY 4 x 6 mm2 meter 12.00 72,380.00 868,560.00
- - BC 4 mm2 meter 10.00 31,416.00 314,160.00
- MCB 4 Amp untuk tiap2 tiang lampu unit 10.00 266,112.00 2,661,120.00
- Instalasi titik lampu titik 21.00 589,050.00 12,370,050.00
- Intalasi titik lampu PJU titik 30.00 654,500.00 19,635,000.00
- Instalasi Stop kontak titik 4.00 392,700.00 1,570,800.00
- Instalasi exhaust fan titik 5.00 392,700.00 1,963,500.00
Jumlah 1,782,991,696.56
d Pengadaan Elektrikal dan Accessories
1 Trafo dan panel TM
- Trafo 1250 kVA, 20kV/380-220V, Dyn 5, dan kelengkapa set 1.00 12,276,439.30 12,276,439.30
Panel Tegangan Menengah (cubicle) 24 kV, incoming
- set 1.00 12,114,907.20 12,114,907.20
dan outgoing with circuit breaker
2 Panel Automatic Main Failure (AMF) dan Change Over Switch (COS)
Change Over Switch untuk kapasitas daya 1500 KvA,
- set 1.00 48,459,628.80 48,459,628.80
plus interlock system
- Box Panel, ukuran T:1800 X L:800 X D:600, free standing set 1.00 8,076,604.80 8,076,604.80
3 Panel Induk Utama, LVM-DP
- Perakitan dan Pemasangan lengkap termasuk aksesoris set 1.00 807,660.48 807,660.48
4 Panel Penerangan Ruang Listrik Utama (PP-RL)
- Perakitan dan Pemasangan lengkap termasuk aksesoris set 1.00 807,660.48 807,660.48
5 Penerangan Ruang listrik utama
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 8.00 40,370.00 322,960.00
- Lampu philips 36W/220V, Industrial Type unit 1.00 40,370.00 40,370.00
- Lampu philips 2 x 36W/220V, Water proof unit 4.00 40,370.00 161,480.00
- Outlet 10A / 220 V unit 2.00 24,200.00 48,400.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 2.00 24,200.00 48,400.00
Exhaust fan, Industrial type, wall mounted, 16", komplit
- set 2.00 242,220.00 484,440.00
base frame
- Titik lampu titik 13.00 72,689.44 944,962.73
Jumlah 84,593,913.79
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6

- PEKERJAAN MEKANIKAL DAN ELEKTRIKAL BANGUNAN IPAL 25,104,485.82


Pengadaan / Pemasangan elektrikal dan aksesoris
Panel Penerangan Bangunan Worskshop, kantor dan Gudang
- Penangkal Petir type Elctrode dengan Rmin = 60m LS 1.00 10,822,650.43 10,822,650.43
- Grounding Anchor Rot 4 meter (3/4) unit 5.00 770,000.00 3,850,000.00
- - NYA 50 mm2 meter 10.00 150,150.00 1,501,500.00
- Clamp Anchor Rot 50 mm2 unit 2.00 16,940.00 33,880.00
- Air terminal Ø 1, termasuk dudukan, komplit set 1.00 686,511.41 686,511.41
- GIP Ø 3 unit 1.00 1,811,040.00 1,811,040.00
- GIP Ø 2 unit 1.00 123,200.00 123,200.00
- Box control 30x30x70 cm unit 1.00 848,043.50 848,043.50
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 807,660.48 807,660.48
- Pengesahan Depnaker LS 1.00 4,620,000.00 4,620,000.00
Jumlah 25,104,485.82

- PEKERJAAN MEKANIKAL DAN ELEKTRIKAL RESERVOIR KAPASITAS 2600 M3 Err:509


a Pengadaan Mekanikal dan Accesories 0
1 Pompa dan Accessories
- Pompa Centifugal Q 35 l/dt - Head 150 m' 90 KW Efisien Unit 2.00 263,197,400.00 526,394,800.00
- Kabel Power NYFGBY 4 x 120 mm m' 300.00 1,184,612.00 355,383,600.00
- Panel Pompa Variable Speed Drive Paralel Alternate 2 x set 1.00 187,912,737.60 187,912,737.60
- Kabel Power NYFGBY 4 x 95 mm m' 75.00 335,500.00 25,162,500.00
- Skun Kabel 300 mm (Cu) set 24.00 93,500.00 2,244,000.00
- Skun Kabel 95 mm (Cu) set 24.00 21,450.00 514,800.00
- Pressure Transmiter Skala 0 - 15 Bar / 4 - 20 mA Unit 3.00 2,904,000.00 8,712,000.00
- Kabel Data 3 x 2,5 mm m' 30.00 36,300.00 1,089,000.00
- Electrode level set 3.00 330,000.00 990,000.00
2 Perpipaan Hisap (Suction) 0
- Ø 350 mm Strainer staenles steel fl unit 3.00 7,318,080.00 21,954,240.00
- Ø 350 mm x 0,60 m' Double fl - fl ( Wall pipa ) unit 3.00 8,129,028.00 24,387,084.00
- Ø 350 mm DI Gate Valve resilient seat unit 9.00 35,215,297.47 316,937,677.23
- Ø 700 mm Header Steel Pipe m' 18.00 5,626,698.00 101,280,564.00
- Ø 700 mm Flange las unit 6.00 3,190,000.00 19,140,000.00
- Ø 700 mm Blank Flange unit 6.00 14,320,152.00 85,920,912.00
- Ø 350 mm Steel pipa unit 9.00 4,291,248.00 38,621,232.00
- Ø 350 mm x Ø 300 mm Steel Concentris Reducer fl -fl unit 9.00 8,544,076.80 76,896,691.20
- Ø 350 mm Flexible Joint unit 9.00 3,403,594.05 30,632,346.45
- Ø 350 mm Flange buta lubang disesuaikan dengan Pompa unit 9.00 4,557,770.85 41,019,937.65
- Ø 350 mm Flange las unit 18.00 5,399,940.00 97,198,920.00
- Ø 350 mm Flange las unit 18.00 1,402,262.85 25,240,731.30
- Ø 700 mm Karet Packing unit 6.00 108,564.17 651,385.01
- Ø 350 mm Karet Packing unit 24.00 80,136.17 1,923,268.05
- Ø 250 mm Karet Packing unit 3.00 80,136.17 240,408.51
- 1" x 5" Baud mur unit 432.00 42,642.00 18,421,344.00
- 1 1/4" x 5" Baud mur unit 120.00 108,026.40 12,963,168.00
- Ø 400 mm x 0,60 m' ( Wall pipa ) unit 4.00 9,979,125.00 39,916,500.00
- Ø 400 mm Butterfly valve fl-fl resilient seat unit 7.00 66,813,120.00 467,691,840.00
- Ø 400 mm Flange Adaptor unit 4.00 6,561,834.45 26,247,337.80
- Ø 400 mm Flexible Joint unit 3.00 23,639,334.45 70,918,003.35
- Ø 400 mm x Ø 250 mm Steel Concentris Reducer fl -fl unit 3.00 5,748,748.80 17,246,246.40
- Ø 400 mm Flange las unit 19.00 1,290,234.45 24,514,454.55
- Ø 400 mm Karet Packing unit 25.00 46,891.97 1,172,299.22
- M24 Baud mur set 36.00 56,554.13 2,035,948.50
- M27 Baud mur set 400.00 62,097.59 24,839,034.00
- M39 Baud mur set 48.00 71,775.53 3,445,225.20
3 Perpipaan Tekan (Discharge)
- Ø 350 mm x Ø 300 Steel Reducer fl - fl unit 3.00 1,747,680.00 5,243,040.00
- Ø 300 mm Flange las m' 6.00 506,000.00 3,036,000.00
- Ø 350 mm x 750mm' Steel Double Flange (wall pipe) unit 3.00 1,842,720.00 5,528,160.00
- Ø 350 mm Steel pipa m' 18.00 Err:509 Err:509
- Ø 350 mm x 45 Steel Bend fl - fl unit 3.00 - -
- Ø 350 mm DI Gate Valve PN 16 Resilien seat unit 6.00 Err:509 Err:509
- Ø 350 mm DI Cek Valve PN 16 Resilian seat unit 3.00 34,461,504.00 103,384,512.00
- Ø 350 mm Flexible Joint PN 16 unit 3.00 3,033,676.80 9,101,030.40
- Ø 350 mm Karet Packing unit 21.00 58069.6875 1,219,463.44
- Ø 350 mm Karet Packing unit 3.00 58069.6875 174,209.06
- 3/4" x 4" Baud Mur unit 288.00 22,275.00 6,415,200.00
- 12,5 mm x 0,50 Steel Pipa risser m' 3.00 44,770.00 134,310.00
- 12,5 mm Ball Valve unit 3.00 228,800.00 686,400.00
- Manometer Scala 0 - 15 Kg/cm2 unit 3.00 200,112.00 600,336.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- 12,5 mm x 90 GWI Bend unit 2.00 10,454.40 20,908.80
- 12,5 mm x 12,5 mm GWI Tee unit 1.00 11,880.00 11,880.00
- Ø 350 mm Butterfly valve fl-fl resilient seat unit 3.00 57,187,257.27 171,561,771.81
- Ø 350 mm Flange Adaptor unit 3.00 1,839,200.00 5,517,600.00
- Ø 350 mm Flexible Joint unit 3.00 6,435,000.00 19,305,000.00
- Ø 350 mm x Ø 200 mm Steel Reducer fl -fl unit 3.00 2,718,144.00 8,154,432.00
- Ø 350 mm x 45 Steel Bend fl - fl unit 3.00 1,155,000.00 3,465,000.00
- Ø 350 mm Flange las unit 3.00 880,000.00 2,640,000.00
- Ø 350 mm Karet Packing unit 18.00 36,850.00 663,300.00
- M24 Baud mur set 216.00 44,187.00 9,544,392.00
- M20 Baud mur set 36.00 39,768.30 1,431,658.80
- Ø 700 mm DI Gate Valve metal resilient Seated all flange unit 1.00 133,626,240.00 133,626,240.00
- Ø 700 mm DI Cek Valve PN 16 Resilian seat unit 1.00 176,000,210.10 176,000,210.10
- Box Uk. 2,4x 1,5 x 1,5 m' unit 2.00 14,437,500.00 28,875,000.00
4 Perpipaan Pengumpul (Header)
- Ø 700 mm Header Steel Pipe m' 10.50 9,452,852.64 99,254,952.72
- Ø 700 mm x Ø 500 mm Steel Reducer flange - flange unit 2.00 26,980,800.00 53,961,600.00
- Ø 700 mm Flange las unit 8.00 20,928,378.24 167,427,025.92
- Ø 700 mm Blank Flange unit 1.00 24,057,855.36 24,057,855.36
- Ø 500 mm x 90° Steel Bend flange - flange unit 1.00 10,378,368.00 10,378,368.00
- Ø 500 mm Flange las unit 3.00 7,242,504.19 21,727,512.58
- Ø 500 mm Steel Dresser Joint unit 1.00 19,931,788.80 19,931,788.80
- Box Water Meter Uk. 200 x 1,5 x 2,5 m' Unit 1.00 24,255,000.00 24,255,000.00
- Ø 500 mm x 0,60 m' Pipa Inlet ( Wall Pipe ) unit 3.00 7,971,963.38 23,915,890.15
- 1" x 5" Baud Mur set 80.00 49,896.00 3,991,680.00
- Ø 500 mm Karet Packing unit 2.00 72,219.84 144,439.68
- Ø 700 mm Karet Packing unit 2.00 94,248.00 188,496.00
- Ø 700 mm Karet Packing unit 7.00 94,248.00 659,736.00
- Ø 700 mm Steel Pipe m' 83.00 9,452,852.64 784,586,769.12
- Ø 700 mm x 45° Steel Bend flange - flange unit 2.00 16,354,800.00 32,709,600.00
- Ø 700 mm x 11.25° Steel Bend flange - flange unit 5.00 6,985,440.00 34,927,200.00
- M39 Baud mur set 216.00 94,617.60 20,437,401.60
5 Perpipaan Over Flow dan Penguras
- Ø 500 mm Overflow Steel Pipe m' 10.00 4,482,717.24 44,827,172.44
- Ø 500 mm Penguras Steel Pipe m' 82.00 4,482,717.24 367,582,813.98
- Ø 500 mm Penguras PVC m' 50.00 2,027,953.13 101,397,656.25
- Ø 500 mm Penguras PVC m' 71.50 697,331.25 49,859,184.38
- A.F. Gate Valve PN 10 Ø 350 mm unit 3.00 24,667,500.00 74,002,500.00
- Cek Valve Ø 350 mm Steel unit 2.00 31,449,736.15 62,899,472.30
- Cek Valve Ø 250 mm Steel unit 1.00 25,159,788.92 25,159,788.92
- Ø 500 mm Karet Packing unit 10.00 63,566.25 635,662.50
- Ø 500 mm Karet Packing unit 2.00 43,642.50 87,285.00
- Ø 500 mm Flange las unit 10.00 1,518,000.00 15,180,000.00
- Ø 500 mm Flange Las unit 2.00 781,770.00 1,563,540.00
- M24 Baud mur set 120.00 44,187.00 5,302,440.00
- M20 Baud mur set 24.00 39,768.30 954,439.20
6 Perpipaan Pompa Back wash Air dan Udara
- Ø 100 mm Steel pipe SCH 40 m' 31.50 1,228,254.44 38,690,015.00
- Ø 200 mm Steel pipe SCH 40 m' 31.50 1,545,260.76 48,675,713.82
- Ø 300 mm Steel pipe SCH 40 m' 6.00 4,482,717.24 26,896,303.46
- Ø 300 mm x Ø 200 mm Steel Reducer flange - flange unit 2.00 4,688,798.40 9,377,596.80
- Ø 200 mm x Ø 150 mm Steel Reducer flange - flange unit 2.00 1,707,750.00 3,415,500.00
- Ø 100 mm Butterfly valve seat fl-fl include actuator unit 4.00 7,172,550.00 28,690,200.00
- Ø 200 mm Butterfly valve Lengkap dengan Pneumatic unit 2.00 23,679,405.34 47,358,810.68
- Ø 200 mm flexsible joint unit 4.00 5,233,092.48 20,932,369.92
- Ø 300 mm Blank flange unit 2.00 2,561,625.00 5,123,250.00
- Ø 100 mm x 90° Steel Bend flange - flange unit 2.00 227,700.00 455,400.00
- Ø 200 mm x 90° Steel Bend flange - flange unit 6.00 2,482,221.46 14,893,328.74
- Ø 100 mm Flange las unit 4.00 355,212.00 1,420,848.00
- Ø 200 mm Flange las unit 22.00 711,562.50 15,654,375.00
- Ø 300 mm Flange las unit 2.00 1,518,000.00 3,036,000.00
- Ø 100 mm Karet Packing unit 4.00 16,698.00 66,792.00
- Ø 150 mm Karet Packing unit 2.00 28,462.50 56,925.00
- Ø 200 mm Karet Packing unit 22.00 43,642.50 960,135.00
- Ø 300 mm Karet Packing unit 4.00 63,566.25 254,265.00
- M16 Baud mur set 32.00 29,458.00 942,656.00
- M20 Baud mur set 288.00 39,768.30 11,453,270.40
- M24 Baud mur set 48.00 44,187.00 2,120,976.00
7 Perpipaan Hydrophore
- Ø 500 mm Steel pipe SCH 40 unit 17.00 3,848,332.39 65,421,650.71
- Ø 700 mm x Ø 500 mm Steel Reducer flange - flange unit 1.00 13,151,369.09 13,151,369.09
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Ø 700 mm x Ø 700 Tee y flange - flange unit 1.00 7,400,250.00 7,400,250.00
- Ø 500 mm x 90° Steel Bend flange - flange unit 6.00 8,525,088.00 51,150,528.00
- Ø 500 mm x 45° Steel Bend flange - flange unit 1.00 8,570,628.00 8,570,628.00
- Gate Valve Ø 500 mm Resellient seat lengkap dengan floo unit 2.00 145,582,272.00 291,164,544.00
- Ø 500 mm Flange las unit 10.00 5,949,199.87 59,491,998.72
- Ø 500 mm Karet Packing unit 8.00 59,323.44 474,587.52
- M30 Baud mur set 160.00 70,430.65 11,268,903.36
- Ø 100 mm Steel pipe SCH 40 m' 40.00 982,603.56 39,304,142.22
- Check Valve Ø 100 mm unit 2.00 5,464,800.00 10,929,600.00
- Realase Valve Ø 75 mm unit 2.00 3,339,600.00 6,679,200.00
- Manometer Scala 0 - 15 Kg/cm2 unit 2.00 276,154.56 552,309.12
8 Sarana Prasarana
- Electric Motor Hoist kapasitas 5 Ton Horizontal dan Verti unit 1.00 98,518,200.00 98,518,200.00
- Electric Motor Hoist crane, Kapasitas 2 ton, lengkap denga set 1.00 57,462,493.44 57,462,493.44
- Pengadaan dan Pemasangan Extended Stem Valve set 3.00 3,015,206.56 9,045,619.69
- IWF Baja 150 x 300 mm Kg 480.00 - -
- Tangki air vessel Kapasitas L 10 m3, Tekanan 16kg/cm2, set 2.00 715,183,355.04 1,430,366,710.08
Jumlah Err:509

c Pengadaan Elektrikal dan Accesories


1 Panel workshop (PK-WK)
- Box Panel Unit 1.00 687,500.00 687,500.00
- Bus Bar 3P+N/205A +PE dan acessories set 1.00 1,615,320.96 1,615,320.96
- MCCB 3P (100-125)A 36 KA + electronic trip set 1.00 3,647,394.73 3,647,394.73
- MCCB 3P (80-100)A 25 KA + electronic trip set 1.00 3,647,394.73 3,647,394.73
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- MCB 3P/16A 10A unit 2.00 190,129.50 380,259.00
- MCB 3P/40A 10A unit 2.00 293,001.50 586,003.00
- MCB 3P/25A 10A unit 2.00 190,129.50 380,259.00
- MCB 3P/20A 10A unit 2.00 190,129.50 380,259.00
- Volt meter (0-500)V, Uk 72x72 unit 1.00 224,400.00 224,400.00
- VS (Voltage selector switch, 7 posisi) unit 1.00 126,500.00 126,500.00
- Plug dan Socket 2P + E 16A, 220 VAC, Panel mounted, k set 1.00 237,452.18 237,452.18
- Plug dan Socket 3P + N + E 16A, 380 VAC, Panel mounte set 1.00 237,452.18 237,452.18
2 Panel Penerangan Ruang Kantor (PP-KR)
- Box plastic mini pragma pintu transparant, inbow, 36 modu unit 1.00 452,430.00 452,430.00
- MCB 3P/16A 10 KA unit 1.00 190,129.50 190,129.50
- RCCB/ELCB, 4P, 25A, Sensitifitas : 30 mA unit 1.00 568,551.50 568,551.50
- MCB 1P/6A 6 KA unit 3.00 40,414.00 121,242.00
- MCB 1P/10A 6 KA unit 7.00 40,414.00 282,898.00
- Box plastic mini pragma pintu transparant, inbow, 12 mod unit 1.00 308,000.00 308,000.00
- RCCB/ELCB, 4P, 16A, Sensitifitas : 30 mA unit 1.00 1,316,392.00 1,316,392.00
- MCB 3P, 32 Amp unit 1.00 700,700.00 700,700.00
- MCB 3P, 16 Amp unit 1.00 1,105,720.00 1,105,720.00
- MCB 1P/4A 6 KA unit 4.00 161,700.00 646,800.00
- MCB 1P/6A 6 KA unit 4.00 40,414.00 161,656.00
- MCB 1P/16A 6 KA unit 1.00 200,200.00 200,200.00
- Lampu TL / DL 2 X 18 watt Unit 15.00 65,450.00 981,750.00
- Lampu TL / DL 2 X 36 watt Unit 22.00 65,450.00 1,439,900.00
- Exhaust fan 40 watt Unit 2.00 439,824.00 879,648.00
- Outlet 10 A/2P+E 220V Unit 16.00 170,940.00 2,735,040.00
- Stop kontak AC Unit 4.00 38,500.00 154,000.00
- Double Switch 10 A/ 220V plano Unit 5.00 23,100.00 115,500.00
- Single switch 10 A/ 220V plano Unit 2.00 18,700.00 37,400.00
- Saklar Hotel Unit 1.00 329,868.00 329,868.00
- Instalasi titik lampu titik 12.00 589,050.00 7,068,600.00
- Instalasi stop kontak titik 20.00 392,700.00 7,854,000.00
- Instalasi exhaust fan titik 2.00 392,700.00 785,400.00
- Kabel dari Panel P. Lt 1 ke P. Penerangan R. Kimia
- NYFGBY 4 x 10 mm2 meter 45.00 174,944.00 7,872,480.00
- BC 4 mm2 meter 20.00 31,416.00 628,320.00
- Box plastic mini pragma pintu transparant, inbow, 12 mod unit 1.00 308,000.00 308,000.00
- RCCB/ELCB, 4P, 16A, Sensitifitas : 30 mA unit 1.00 1,316,392.00 1,316,392.00
- MCB 3P, 16 Amp unit 1.00 1,105,720.00 1,105,720.00
- MCB 1P/4A 6 KA unit 1.00 161,700.00 161,700.00
- MCB 1P/6A 6 KA unit 3.00 40,414.00 121,242.00
- MCB 1P/10A 6 KA unit 1.00 40,414.00 40,414.00
- MCB 1P/16A 6 KA unit 1.00 200,200.00 200,200.00
- Lampu TL / DL 1 X 32 watt Unit 11.00 65,450.00 719,950.00
- Exhaust fan 40 watt Unit 3.00 439,824.00 1,319,472.00
- Outlet 10 A/2P+E 220V Unit 11.00 170,940.00 1,880,340.00
- Stop kontak AC Unit 3.00 38,500.00 115,500.00
- Double Switch 10 A/ 220V plano Unit 5.00 23,100.00 115,500.00
- Single switch 10 A/ 220V plano Unit 3.00 18,700.00 56,100.00
- Saklar Hotel Unit 1.00 329,868.00 329,868.00
- Instalasi stop kontak titik 14.00 392,700.00 5,497,800.00
- Instalasi exhaust fan titik 3.00 392,700.00 1,178,100.00
- Kabel dari P. Penerangan Lt 2 ke P. Penerangan Lt. 1
- NYY 4 x 4 mm2 meter 7.00 174,944.00 1,224,608.00
- BC 4 mm2 meter 7.00 31,416.00 219,912.00
- Skun Kabel 10 mm (Cu) set 4.00 231,000.00 924,000.00
- Skun Kabel 4 mm (Cu) set 6.00 100,100.00 600,600.00
3 Terminal board Grounding (1B-G)
- Box Panel unit 1.00 687,500.00 687,500.00
- Accessories penunjang termasuk busbar, isolator, supportin LS 1.00 993,422.39 993,422.39
4 Panel Penerangan Lampu Luar Air Bersih (PP-LR3)
- Box Panel outdoor type unit 1.00 269,500.00 269,500.00
- MCB 3P/20A 6 KA unit 2.00 190,129.50 380,259.00
- Contactor, 3P, 32 A AC1, 380 V unit 1.00 396,550.00 396,550.00
- Photo cell unit 1.00 96,919.26 96,919.26
- MCB 1P/10A 6 KA unit 2.00 40,414.00 80,828.00
5 Panel penerangan Ruang Pompa Air Bersih (PP-AB)
- Box Plastic mini pragma pintu tranparant, inbow, 12 modu unit 1.00 186,780.00 186,780.00
- MCB 3P/16A 10 KA unit 1.00 190,129.50 190,129.50
- RCCB/ELCB, 4P, 25A, Sensitifitas : 30 mA unit 1.00 568,551.50 568,551.50
- MCB 1P/6A 6 KA unit 6.00 40,414.00 242,484.00
- MCB 1P/10A 6 KA unit 4.00 40,414.00 161,656.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
6 Penerangan Ruang Kantor/ Laboratorium/ Ruang Kendali
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 8.00 396,000.00 3,168,000.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 2.00 528,000.00 1,056,000.00
- Lampu Phillips 2 x 36W/220V, waterproof unit 8.00 528,000.00 4,224,000.00
- Single switch 10 A/ 220V plano unit 18.00 18,700.00 336,600.00
- Double Switch 10 A/ 220V plano unit 4.00 23,100.00 92,400.00
- Outlet 10A / 220V unit 10.00 92,073.30 920,733.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 3.00 253,605.40 760,816.19
- Kabel NYM 3 x 2,5 mm2 m 250.00 14,300.00 3,575,000.00
- uPVC Conduit 20 m m 175.00 8,635.00 1,511,125.00
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
- Exhaust fan, Industrial type, wall mounted, 16", komplit b set 2.00 583,000.00 1,166,000.00
- Air Conditioning, Cooling Capacity 1350W, 1 phase, wall set 2.00 5,445,000.00 10,890,000.00
7 Penerangan Ruang Pompa Air Bersih
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 8.00 396,000.00 3,168,000.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 8.00 528,000.00 4,224,000.00
- Single switch 10 A/ 220V plano unit 6.00 18,700.00 112,200.00
- Double Switch 10 A/ 220V plano unit 4.00 23,100.00 92,400.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 2.00 253,605.40 507,210.79
- Kabel NYM 3 x 2,5 mm2 m 180.00 14,300.00 2,574,000.00
- uPVC Conduit 20 m m 150.00 8,635.00 1,295,250.00
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
- Exhaust fan, Industrial type, wall mounted, 16", komplit b set 2.00 583,000.00 1,166,000.00
8 Panel Penerangan Work shop (PP-WS)
- Box Plastic mini pragma pintu tranparant, inbow, 24 modu unit 1.00 297,880.00 297,880.00
- MCB 3P/16A 10 KA unit 1.00 190,129.50 190,129.50
- RCCB/ELCB, 4P, 25A, Sensitifitas : 30 mA unit 1.00 568,551.50 568,551.50
- MCB 1P/6A 6 KA unit 4.00 40,414.00 161,656.00
- MCB 1P/10A 6 KA unit 3.00 40,414.00 121,242.00
9 Panel Penerangan Work Shop (PP-WS) Lantai 2 (Office)
- Box Plastic mini pragma pintu tranparant, inbow, 24 modu unit 1.00 297,880.00 297,880.00
- Box Plastic mini pragma pintu tranparant, inbow, 12 modu unit 1.00 186,780.00 186,780.00
- MCB 3P/16A 10 KA unit 1.00 190,129.50 190,129.50
- RCCB/ELCB, 4P, 25A, Sensitifitas : 30 mA unit 1.00 568,551.50 568,551.50
- MCB 1P/6A 6 KA unit 12.00 40,414.00 484,968.00
- MCB 1P/10A 6 KA unit 9.00 40,414.00 363,726.00
10 Penerangan Ruang Workshop
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 8.00 396,000.00 3,168,000.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 8.00 528,000.00 4,224,000.00
- Lampu Phillips 18W/220V, Baret type unit 2.00 528,000.00 1,056,000.00
- Mercury 250 watt with industrial cap type high-bay reflec unit 4.00 676,500.00 2,706,000.00
- Single switch 10 A/ 220V plano unit 6.00 18,700.00 112,200.00
- Double Switch 10 A/ 220V plano unit 4.00 23,100.00 92,400.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 2.00 253,605.40 507,210.79
- Kabel NYM 3 x 2,5 mm2 m 180.00 14,300.00 2,574,000.00
- uPVC Conduit 20 m m 150.00 8,635.00 1,295,250.00
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
- Exhaust fan, Industrial type, wall mounted, 16", komplit b set 2.00 583,000.00 1,166,000.00
11 Penangkal Petir Bangunan Workshop, Lab dan Office
- Penangkal Petir type Elctrode dengan Rmin = 60m LS 1.00 10,822,650.43 10,822,650.43
- BC 50 mm2 m 56.00 54,450.00 3,049,200.00
- Clamp BC, 50 mm2 unit 200.00 40,383.02 8,076,604.80
- Air terminal Ø 1, termasuk dudukan, komplit set 8.00 686,511.41 5,492,091.26
- GIP Ø 2 termasuk socket set 2.00 662,281.60 1,324,563.20
- Grounding rod 3/4 set 2.00 282,681.17 565,362.34
- Pipa PVC Ø 1, termasuk clamp set 2.00 290,757.78 581,515.55
- Box control 30x30x70 cm LS 2.00 848,043.50 1,696,087.01
12 Penangkal Petir Bangunan Pompa Air Bersih
- Penangkal Petir type Elctrode dengan Rmin = 60m LS 1.00 10,822,650.43 10,822,650.43
- BC 50 mm2 m 74.00 54,450.00 4,029,300.00
- Clamp BC, 50 mm2 unit 250.00 40,383.02 10,095,756.00
- Air terminal Ø 1, termasuk dudukan, komplit set 4.00 686,511.41 2,746,045.63
- GIP Ø 2 termasuk socket set 4.00 662,281.60 2,649,126.39
- Grounding rod 3/4 set 2.00 282,681.17 565,362.34
- Pipa PVC Ø 1, termasuk clamp set 2.00 290,757.78 581,515.55
- Box control 30x30x70 cm LS 2.00 848,043.50 1,696,087.01
13 Panel Pompa Kontrol Back Wash
- Box Plate metal, 2000x800x600 mm, Floor Standing Unit 1.00 12,684,980.00 12,684,980.00
- MCCB 3 POLE, 200 A Unit 1.00 9,186,254.00 9,186,254.00
- Current Transformator 200/5 A Unit 3.00 833,294.00 2,499,882.00
- Power Meter Digital Unit 1.00 1,848,000.00 1,848,000.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Indicator Lamp R, S, T Unit 7.00 63,140.00 441,980.00
- LAMPU TL 10 watt Unit 1.00 65,450.00 65,450.00
- MINI FUSE 2A Unit 3.00 140,756.00 422,268.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Push Bottom Unit 1.00 63,140.00 63,140.00
- Emergency Push Button Unit 1.00 396,242.00 396,242.00
- Buzzer, 70 dBA Unit 1.00 20,350.00 20,350.00
- Plug in relay 220V, 14 pin, 4 kontak C/O, 5 amp, built Unit 6.00 46,750.00 280,500.00
- Illuminated Push Button, 220VAC Unit 8.00 475,860.00 3,806,880.00
- Selector Switch 3 Posisi Unit 4.00 342,034.00 1,368,136.00
- MCCB 3 POLE, 80 A Unit 4.00 2,203,740.00 8,814,960.00
- MCB 3 POLE, 32 A Unit 2.00 700,700.00 1,401,400.00
- MCB 3 POLE, 6 A Unit 1.00 1,315,776.00 1,315,776.00
- MCB 3 POLE, 16 A Unit 1.00 1,315,776.00 1,315,776.00
- MCB 2 POLE, 6 A Unit 2.00 982,058.00 1,964,116.00
- MCB 1P/4A 6 KA Unit 3.00 161,700.00 485,100.00
- MAGNETIC CONTACTOR LC1-D50 Unit 4.00 3,986,136.00 15,944,544.00
- MAGNETIC CONTACTOR LC1-D40 Unit 2.00 3,349,346.00 6,698,692.00
- MAGNETIC CONTACTOR LC1-D25 Unit 2.00 3,349,346.00 6,698,692.00
- Thermal Overload LR-D340 Unit 2.00 2,809,268.00 5,618,536.00
- Thermal Overload LR-D21 Unit 2.00 1,107,414.00 2,214,828.00
- Power Supply DC 220VAC / 24VDC 10A Unit 1.00 6,012,930.00 6,012,930.00
- Kabel tray 200x 100 Btg 3.00 2,840,376.00 8,521,128.00
- Grounding, Perakitan dan Pemasangan lengkap termasuk a LS 1.00 807,660.48 807,660.48
14 Panel Kontrol Distribusi
- Box Plate metal, 3400x2100x1000 mm, Floor Standing Unit 1.00 12,684,980.00 12,684,980.00
- MCCB 3 POLE, 630 A Unit 1.00 9,186,254.00 9,186,254.00
- Current Transformator 1000/5 A Unit 3.00 833,294.00 2,499,882.00
- Power Meter Digital Unit 1.00 1,848,000.00 1,848,000.00
- Indicator Lamp R, S, T Unit 3.00 63,140.00 189,420.00
- LAMPU TL 10 watt Unit 3.00 65,450.00 196,350.00
- MINI FUSE 2A Unit 3.00 140,756.00 422,268.00
- Push Bottom Unit 6.00 63,140.00 378,840.00
- Emergency Push Button Unit 1.00 396,242.00 396,242.00
- Buzzer, 70 dBA Unit 1.00 20,350.00 20,350.00
- Plug in relay 220V, 14 pin, 4 kontak C/O, 5 amp, built Unit 12.00 46,750.00 561,000.00
- Illuminated Push Button, 220VAC Unit 6.00 475,860.00 2,855,160.00
- Selector Switch 3 Posisi Unit 3.00 342,034.00 1,026,102.00
- 3 POLE, 1000 A Unit 1.00 308,000.00 308,000.00
- MCB 3 POLE, 6 A Unit 5.00 1,315,776.00 6,578,880.00
- MCB 3 POLE, 10 A Unit 1.00 1,315,776.00 1,315,776.00
- MAGNETIC CONTACTOR LC1-F500 Unit 4.00 3,986,136.00 15,944,544.00
- Power Supply DC 220VAC / 24VDC 10A Unit 1.00 6,012,930.00 6,012,930.00
- Kabel tray 200x 100 Btg 3.00 2,840,376.00 8,521,128.00
- Grounding, Perakitan dan Pemasangan lengkap termasuk a LS 1.00 807,660.48 807,660.48
15 Panel Meja Kontrol Filter Utama
- Box Plate metal, 1250x1600x1040 mm, FS Meja Unit 1.00 15,400,000.00 15,400,000.00
- MCB 1P/4A 6 KA unit 3.00 161,700.00 485,100.00
- Plug in relay 220V, 14 pin, 4 kontak C/O, 5 amp, built unit 36.00 46,750.00 1,683,000.00
- Plug in relay 220V, 14 pin, 4 kontak C/O, 5 amp, built unit 15.00 46,750.00 701,250.00
- Illuminated Push Button, 220VAC unit 36.00 475,860.00 17,130,960.00
- Illuminated Push Button, 220VAC unit 36.00 475,860.00 17,130,960.00
- Selector Switch 3 Posisi unit 7.00 342,034.00 2,394,238.00
- Power Supply DC 220VAC / 24VDC 10A unit 1.00 6,012,930.00 6,012,930.00
- Emergency Switch unit 1.00 396,242.00 396,242.00
- Push Bottom unit 2.00 63,140.00 126,280.00
- Indicator Lamp R, S, T unit 2.00 63,140.00 126,280.00
- Air Regulator unit 1.00 2,199,120.00 2,199,120.00
- Air Pressure Switch unit 1.00 2,489,256.00 2,489,256.00
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 807,660.48 807,660.48
16 Panel Filter ( Selenoid )
- Panel Lokal Filter Outdoor type double door dengan suppo unit 6.00 5,390,000.00 32,340,000.00
- Selenoid valve + manifold 6 selenoid (by others)
- Plug in relay 220V, 14 pin, 4 kontak C/O, 5 amp, built unit 30.00 46,750.00 1,402,500.00
- Illuminated Push Button Green, 220VAC unit 30.00 475,860.00 14,275,800.00
- Illuminated Push Button Red, 220VAC unit 30.00 475,860.00 14,275,800.00
- Selector Switch 3 Posisi unit 30.00 342,034.00 10,261,020.00
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 807,660.48 807,660.48
17 Panel Kontrol Filter ( kontrol )
- Box Plate metal, 600x500x200 mm, Wall Mounting unit 1.00 4,620,000.00 4,620,000.00
- MCB 3P/6A, 6 KA unit 1.00 1,315,776.00 1,315,776.00
- RCCB/ELCB, 4P, 10A, Sensitifitas : 30 mA unit 1.00 930,160.00 930,160.00
- MCB 1P/4A 6 KA unit 5.00 161,700.00 808,500.00
- MCB 1P/6A 6 KA unit 1.00 40,414.00 40,414.00
- Time Switch 24 Jam unit 1.00 1,319,472.00 1,319,472.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Magnetic Contactor 10A unit 1.00 1,391,852.00 1,391,852.00
- Indicator Lamp R, S, T unit 3.00 63,140.00 189,420.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Mini Fuse 2A unit 4.00 140,756.00 563,024.00
- Selector Switch 3 Posisi unit 1.00 342,034.00 342,034.00
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 807,660.48 807,660.48
18 Instalasi Penerangan R. Pompa
- Lampu TL 2 X 18 watt unit 12.00 65,450.00 785,400.00
- Lampu TL 2 x 36 watt unit 9.00 65,450.00 589,050.00
- Outlet 10 A/2P+E 220V unit 1.00 170,940.00 170,940.00
- Stop kontak AC unit 1.00 38,500.00 38,500.00
- Double Switch 10 A/ 220V plano unit 2.00 23,100.00 46,200.00
- Single switch 10 A/ 220V plano unit 2.00 18,700.00 37,400.00
- Instalasi titik lampu titik 21.00 589,050.00 12,370,050.00
- Instalasi stop kontak titik 2.00 392,700.00 785,400.00
- Kabel dari penerangan Pompa ke Panel Pompa Distribusi
- - NYY 5 x 2,5 mm2 meter 15.00 44,044.00 660,660.00
19 Panel Penerangan R. Kontrol dan R. Backwash
- Box plastic mini pragma pintu transparant, inbow, 12 mod unit 1.00 308,000.00 308,000.00
- RCCB/ELCB, 4P, 10A, Sensitifitas : 30 mA unit 1.00 930,160.00 930,160.00
- MCB 3P, 10 Amp unit 1.00 1,315,776.00 1,315,776.00
- MCB 1P/4A 6 KA unit 5.00 161,700.00 808,500.00
- MCB 1P/6A 6 KA unit 1.00 40,414.00 40,414.00
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 807,660.48 807,660.48
20 Instalasi Penerangan R. Kontrol dan R. Backwash
- Lampu TL 2 X 18 watt unit 6.00 65,450.00 392,700.00
- Outlet 10 A/2P+E 220V unit 5.00 170,940.00 854,700.00
- Stop kontak 3P 6 Amp (pug & soket) unit 1.00 662,046.00 662,046.00
- Stop kontak AC unit 2.00 38,500.00 77,000.00
- Double Switch 10 A/ 220V plano unit 2.00 23,100.00 46,200.00
- Single switch 10 A/ 220V plano unit 5.00 18,700.00 93,500.00
- Instalasi titik lampu titik 6.00 589,050.00 3,534,300.00
- Instalasi stop kontak titik 8.00 392,700.00 3,141,600.00
- Kabel dari P. Penerangan R. Kontrol ke Panel Backwash
- - NYY 5 x 2,5 mm2 meter 20.00 44,044.00 880,880.00
Jumlah 551,651,998.02

d Pemasangan Elektrikal dan Accesories


1 Panel workshop (PK-WK)
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 807,660.48 807,660.48
2 Panel Penerangan Ruang Kantor (PP-KR)
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 807,660.48 807,660.48
3 Terminal board Grounding (1B-G)
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 807,660.48 807,660.48
4 Panel Penerangan Lampu Luar Air Bersih (PP-LR3)
- Perakitan dan Pemasangan lengkap termasuk aksesoris set 1.00 807,660.48 807,660.48
5 Panel penerangan Ruang Pompa Air Bersih (PP-AB)
- Perakitan dan Pemasangan lengkap termasuk aksesoris set 1.00 807,660.48 807,660.48
6 Penerangan Ruang Kantor/ Laboratorium/ Ruang Kendali
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Lampu Phillips 2 x 36W/220V, waterproof unit 1.00 40,370.00 40,370.00
- Outlet 10A / 220V unit 1.00 24,200.00 24,200.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 1.00 24,200.00 24,200.00
- Exhaust fan, Industrial type, wall mounted, 16", komplit b set 1.00 242,220.00 242,220.00
- Air Conditioning, Cooling Capacity 1350W, 1 phase, wall set 1.00 242,220.00 242,220.00
- Titik Lampu titik 1.00 72,689.44 72,689.44
7 Penerangan Ruang Pompa Air Bersih
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 1.00 24,200.00 24,200.00
- Exhaust fan, Industrial type, wall mounted, 16", komplit b set 1.00 242,220.00 242,220.00
- Titik Lampu titik 1.00 72,689.44 72,689.44
8 Panel Penerangan Work shop (PP-WS)
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 807,660.48 807,660.48
Panel Penerangan Work Shop (PP-WS) Lantai 2 (Office)
- Perakitan dan Pemasangan lengkap termasuk aksesoris set 1.00 807,660.48 807,660.48
9 Penerangan Ruang Workshop
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 1.00 40,370.00 40,370.00
- Lampu Phillips 18W/220V, Baret type unit 1.00 40,370.00 40,370.00
- Mercury 250 watt with industrial cap type high-bay reflec unit 1.00 40,370.00 40,370.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 1.00 40,370.00 40,370.00
- Exhaust fan, Industrial type, wall mounted, 16", komplit b set 1.00 242,220.00 242,220.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Titik Lampu titik 1.00 72,689.44 72,689.44
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
10 Penangkal Petir Bangunan Workshop, Lab dan Office
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 807,660.48 807,660.48
11 Penangkal Petir Bangunan Pompa Air Bersih
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 807,660.48 807,660.48
Jumlah 8,932,192.64

- PEKERJAAN MEKANIKAL DAN ELEKTRIKAL LUAR BANGUNAN 7,910,406,559.05


a Pengadaan kabel-kabel
1 Biaya Penyambungan Baru Pelanggan TM 1385 KVA
- BP + UJL Unit 1.00 497,196,750.00 497,196,750.00
- Jasa Pengurusan SLO Ls 638,250.00 50.00 31,912,500.00
2 Kabel dari PLN ke Panel TM, Primer Trafo, Sekunder Trafo, Genset, MDP ke masing - masing panel (Air Baku, Air bersih, Blower, Dosing, Panel Penerangan, Genset )
- Dari meter PLN ke Panel TM (cubicle)
- Kabel XLPE 1 x 70 mm2 12/20/kV m 60.00 158,400.00 9,504,000.00
- Terminating kabel XLPE, 70 mm2 set 6.00 5,088,261.02 30,529,566.14
- Dari meter Panel TM (cubicle) ke primer trafo
- Kabel XLPE 1 x 70 mm2 12/20/kV m 30.00 158,400.00 4,752,000.00
- Terminating kabel XLPE, 70 mm2 set 6.00 5,088,261.02 30,529,566.14
- Dari Sekunder trafo ke Panel MDP
- Kabel NYY 1 x 500 mm2 m 80.00 434,500.00 34,760,000.00
- Dari Generator 2x625 kVA ke Panel MDP
- Kabel NYY 1 x 300 mm2 m 120.00 269,500.00 32,340,000.00
- Kabel NYY 1 x 500 mm2 m 40.00 434,500.00 17,380,000.00
- Kabel NYA 1 x 120 mm2 m 30.00 104,500.00 3,135,000.00
- Dari Panel MDP ke panel M-PK (Pompa Doosing Kimia)
- Kabel NYFGbY 4 x 16 mm2 m 183.00 71,500.00 13,084,500.00
- Kabel NYA 1 x 16 mm2 m 183.00 14,300.00 2,616,900.00
- Dari Panel MDP ke Panel M-FL (Filter)
- Kabel NYFGbY 4 x 35 mm2 m 102.00 137,500.00 14,025,000.00
- Kabel NYA 1 x 25 mm2 m 102.00 23,100.00 2,356,200.00
- Kabel NYFGbY 4 x 95 mm2 m 85.00 335,500.00 28,517,500.00
- Kabel NYA 1 x 70 mm2 m 85.00 59,400.00 5,049,000.00
- Dari Panel MDP ke panel DP - WS (Workshop)
- Kabel NYFGbY 4 x 35 mm2 m 183.00 137,500.00 25,162,500.00
- Kabel NYA 1 x 25 mm2 m 183.00 23,100.00 4,227,300.00
- Dari Panel MDP ke panel PC-AB (Air Bersih)
- Kabel NYFGbY 4 x 300 mm2 m 30.00 1,028,500.00 30,855,000.00
- Kabel NYA 1 x 120 mm2 m 30.00 104,500.00 3,135,000.00
- Dari Panel MDP ke panel PC-ABK (Air Baku)
- Kabel NYFGbY 4 x 300 mm2 m 80.00 1,028,500.00 82,280,000.00
- Kabel NYA 1 x 120 mm2 m 80.00 104,500.00 8,360,000.00
- Kabel NYFGbY 4 x 95 mm2 m 80.00 335,500.00 26,840,000.00
- Kabel NYA 1 x 70 mm2 m 80.00 59,400.00 4,752,000.00
- Dari MDP ke Panel TB-G (terminal Box Grounding)
- Kabel NYA 1 x 120 mm2 m 9.00 104,500.00 940,500.00
- Dari panel TB-G ke box control
- Kabel NYA 1 x 120 mm2 m 24.00 104,500.00 2,508,000.00
- Acessories
- GIP 1 " m 4.00 63,966.71 255,866.82
- GIP 2" m 20.00 123,200.00 2,464,000.00
- GIP 3" m 8.00 181,720.00 1,453,760.00
- GIP 4" m 16.00 281,204.00 4,499,264.00
2 Kabel daya ke sub panel / panel penerangan
- Dari Panel MDP ke panel PP-RL
- Kabel NYY 4 x 4 mm2 m 7.00 33,000.00 231,000.00
- Kabel NYA 1 x 6 mm2 m 7.00 9,240.00 64,680.00
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
- Dari Panel M-PK ke panel PP-RJ (PP Ruang Jaga)
- Kabel NYFGbY 3 x 4 mm2 m 40.00 26,950.00 1,078,000.00
- GIP 1 " m 3.00 63,966.71 191,900.12
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
- Dari Panel M-PK ke panel PP-RK
- Kabel NYY 4 x 4 mm2 m 25.00 33,000.00 825,000.00
- Kabel NYA 1 x 6 mm2 m 25.00 9,240.00 231,000.00
- GIP 1 " m 2.00 63,966.71 127,933.41
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
- Dari Panel M-PK ke panel PP-KR
- Kabel NYY 4 x 6 mm2 m 20.00 46,200.00 924,000.00
- Kabel NYA 1 x 6 mm2 m 20.00 9,240.00 184,800.00
- GIP 1 " m 2.00 63,966.71 127,933.41
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
- Dari Panel PC-ABK ke panel PP-ABK
- Kabel NYY 4 x 4 mm2 m 7.00 33,000.00 231,000.00
- Kabel NYA 1 x 6 mm2 m 7.00 9,240.00 64,680.00
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Dari Panel F-FL ke panel PP - RL2
- Kabel NYY 4 x 6 mm2 m 7.00 46,200.00 323,400.00
- Kabel NYA 1 x 6 mm2 m 7.00 9,240.00 64,680.00
- Dari Panel M-FL ke panel PP-FL
- Kabel NYY 4 x 6 mm2 m 7.00 46,200.00 323,400.00
- Kabel NYA 1 x 6 mm2 m 7.00 9,240.00 64,680.00
- GIP 1 " m 2.00 63,966.71 127,933.41
- Dari Panel M-FL ke Panel PC-BWR
- Kabel NYY 4 x 4 mm2 m 150.00 33,000.00 4,950,000.00
- Kabel NYA 1 x 6 mm2 m 40.00 9,240.00 369,600.00
- Dari panel M-FL ke panel MOBV filter
- Kabel NYY 4 x 2.5 mm2 m 150.00 22,000.00 3,300,000.00
- Dari Panel M-FL ke panel PC-BWR
- Kabel NYFGbY 4 x 25 mm2 m 80.00 104,500.00 8,360,000.00
- Kabel NYA 1 x 25 mm2 m 80.00 23,100.00 1,848,000.00
- GIP 2" m 8.00 123,200.00 985,600.00
- Dari Panel PC-BWR ke panel PP-BWR
- Kabel NYY 3x4 mm2 m 7.00 25,300.00 177,100.00
- Kabel NYA 1 x 6 mm2 m 7.00 9,240.00 64,680.00
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
- Dari Panel PC-BW ke panel PP-BW
- Kabel NYY 4 x 4 mm2 m 7.00 33,000.00 231,000.00
- Kabel NYA 1 x 6 mm2 m 7.00 9,240.00 64,680.00
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
- Dari Panel PC-AB ke panel PP-LR3
- Kabel NYFGbY 4 x 6 mm2 m 15.00 39,600.00 594,000.00
- Kabel NYA 1 x 6 mm2 m 15.00 9,240.00 138,600.00
- Dari panel PP - LR3 ke panel PP-PJ
- Kabel NYY 4 x 4 mm2 m 7.00 33,000.00 231,000.00
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
- Dari Panel PC-AB ke panel PP-AB
- Kabel NYY 4 x 4 mm2 m 7.00 33,000.00 231,000.00
- Kabel NYA 1 x 6 mm2 m 7.00 9,240.00 64,680.00
- uPVC Conduit 25 mm m 2.00 17,600.00 35,200.00
- Dari Panel PC-ABK ke panel PP-LR1
- Kabel NYFGbY 4 x 6 mm2 m 15.00 39,600.00 594,000.00
- Kabel NYA 1 x 6 mm2 m 15.00 9,240.00 138,600.00
3 Kabel daya dan kontrol dari masing - masing panel kontrol ke masing - masing motor, ukuran kabel sesuai dengan spesifikasi masing - masing motor
- Dari Panel PC -AB ke terminal motor, pompa Air Bersih
- Kabel NYY 3 x 70 mm2 m 120.00 187,000.00 22,440,000.00
- Kabel NYA 1 x 70 mm2 m 60.00 59,400.00 3,564,000.00
- Dari Panel PC -AB ke terminal motor, pompa backwash
- Kabel NYY 3 x 6 mm2 m 72.00 35,200.00 2,534,400.00
- Kabel NYA 1 x 6 mm2 m 36.00 9,240.00 332,640.00
- Dari Panel PC -ABK ke terminal motor, pompa air baku
- Kabel NYY 3 x 35 mm2 m 80.00 104,500.00 8,360,000.00
- Kabel NYA 1 x 35 mm2 m 20.00 30,800.00 616,000.00
- Dari Panel PC -ABK ke terminal motor blower
- Kabel NYY 3 x 6 mm2 m 40.00 35,200.00 1,408,000.00
- Kabel NYA 1 x 6 mm2 m 20.00 9,240.00 184,800.00
- Dari Panel PC -ABK ke terminal motor air compressor
- Kabel NYY 3 x 6 mm2 m 100.00 35,200.00 3,520,000.00
- Kabel NYA 1 x 6 mm2 m 12.00 9,240.00 110,880.00
- Dari Panel PC -ABK ke terminal motor mixer/pompa dosing/blower
- Kabel NYY 4 x 2.5 mm2 m 100.00 22,000.00 2,200,000.00
- Dari Panel PC -ABK ke local control panel (LCP-MX/BW/AL/SA)
- Kabel NYY 3 x 2.5 mm2 m 80.00 16,500.00 1,320,000.00
- Dari Panel PC -ABK ke masing-masing pneumatice valve
- Kabel NYY 3 x 2.5 mm2 m 600.00 16,500.00 9,900,000.00
- Dari Panel M-FL ke masing-masing pneumatice valve sludge drain
- Kabel NYY 3 x 2.5 mm2 m 100.00 16,500.00 1,650,000.00
- Dari Panel PC-ABK ke LCP-ABK 1/2/3
- Kabel NYY 3 x 2.5 mm2 m 66.00 16,500.00 1,089,000.00
- Acessories
- Supporting kabel/rak LS 1.00 7,995,838.75 7,995,838.75
4 Kabel dari Panel Dosing ke peralatan
- Kabel dari Panel Dosing ke LVMDP
- NYFGBY 4 x 70 mm2 meter 150.00 338,800.00 50,820,000.00
- BC 35 mm2 meter 30.00 91,168.00 2,735,040.00
- Kabel dari Panel Dosing ke Dosing pumps
- NYY 4 x 2.5 mm2 meter 95.00 20,728.63 1,969,220.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- NYYHY 3 x 1,5 mm2 meter 110.00 22,638.00 2,490,180.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Kabel dari Panel Dosing ke Mixer
- NYY 4 x 2,5 mm2 meter 110.00 52,360.00 5,759,600.00
- NYYHY 3 x 1,5 mm2 meter 110.00 22,638.00 2,490,180.00
- Kabel tray 30 x 40 Btg 1.00 2,784,474.00 2,784,474.00
5 Pekerjaan kabel ( Ruang Genset )
- Kabel dari Cubicle PLN ke Cubicle User
- XLPE 3 x (1 x 70mm2) meter 20.00 455,840.00 9,116,800.00
- Kabel dari LVMDP ke Genset
- NYFGBY 4 x (4 x 300 mm2) meter 15.00 10,780,000.00 161,700,000.00
- Kabel dari Cubicle ke travo
- XLPE 3 x (1 x 70mm2) meter 10.00 455,840.00 4,558,400.00
- Kabel dari Travo ke LVMDP
- NYY 3 x (4 x 1 x 500 mm2) meter 15.00 3,537,155.89 53,057,338.35
- NYY 1 x (2 x 1 x 500 mm2) meter 15.00 2,667,280.00 40,009,200.00
6 Instalasi Pentanahan
- Grounding untuk Cubicle Netral PLN
- BC 35 mm2 meter 20.00 91,168.00 1,823,360.00
- Grounding rod 3/4 batang 4.00 2,266,880.00 9,067,520.00
- Grounding untuk Spare
- BC 35 mm2 meter 17.00 91,168.00 1,549,856.00
- Grounding rod 3/4 batang 4.00 2,266,880.00 9,067,520.00
- Grouding Netral Genset
- BC 35 mm2 meter 27.00 91,168.00 2,461,536.00
- Grounding rod 3/4 batang 4.00 2,266,880.00 9,067,520.00
- Grounding Netral Travo
- BC 35 mm2 meter 31.00 91,168.00 2,826,208.00
- Grounding rod 3/4 batang 4.00 2,266,880.00 9,067,520.00
- Grouding Panel (JB)
- BC 2 x 120 mm2 meter 51.00 608,608.00 31,039,008.00
- Grounding rod 3/4 batang 4.00 2,266,880.00 9,067,520.00
- Junction Box Grounding ke Genset, Travo
- BC 35 mm2 meter 30.00 91,168.00 2,735,040.00
- Grounding rod 3/4 batang 4.00 2,266,880.00 9,067,520.00
- Junction Box Grounding ke LVMDP
- BC 120 mm2 meter 20.00 304,304.00 6,086,080.00
- Grounding rod 3/4 batang 4.00 2,266,880.00 9,067,520.00
- Junction Box Grounding unit 1.00 2,580,270.00 2,580,270.00
7 Pekerjaan kabel-kabel di IPA
- Kabel dari Panel Distribusi ke Pompa Distribusi
- NYY 3 x (1 x 300mm2) meter 70.00 2,185,260.00 152,968,200.00
- BC 120 mm2 meter 70.00 304,304.00 21,301,280.00
- Kabel dari Panel Distribusi ke LVMDP
- NYFGBY 4 x 300 mm2 meter - 1,028,500.00 -
- BC 120 mm2 meter 20.00 304,304.00 6,086,080.00
- Kabel dari Panel Distribusi ke Hoist
- NYY 4 x 2,5 mm2 meter 10.00 52,360.00 523,600.00
Junction box untuk hoist unit 1.00 1,319,472.00 1,319,472.00
- Kabel dari Panel backwash ke LVMDP
-NYFGBY 4 x 95 mm meter 200.00 1,076,460.00 215,292,000.00
-NYFGBY 4 x 1.5 mm meter 10.00 156,156.00 1,561,560.00
- BC 35 mm2 meter - 91,168.00 -
- Kabel dari Panel Backwash ke Hoist
- NYY 4 x 2,5 mm2 meter 1.00 52,360.00 52,360.00
Junction box untuk hoist unit 1.00 1,319,472.00 1,319,472.00
- Kabel dari Panel Meja ke Panel Lokal Filter 1
- NYYHY 6 x (4 x 1,5mm2) meter 50.00 156,156.00 7,807,800.00
- Kabel dari Panel Meja ke Panel Lokal Filter 2
- NYYHY 6 x (4 x 1,5mm2) meter 45.00 156,156.00 7,027,020.00
- Kabel dari Panel Meja ke Panel Lokal Filter 3
- NYYHY 6 x (4 x 1,5mm2) meter 45.00 156,156.00 7,027,020.00
- Kabel dari Panel Meja ke Panel Lokal Filter 4
- NYYHY 6 x (4 x 1,5mm2) meter 40.00 156,156.00 6,246,240.00
- Kabel dari Panel Meja ke Panel Lokal Filter 5
- NYYHY 6 x (4 x 1,5mm2) meter 40.00 156,156.00 6,246,240.00
- Kabel dari Panel Meja ke Panel Lokal Filter 6
- NYYHY 6 x (4 x 1,5mm2) meter 35.00 156,156.00 5,465,460.00
Pipa GIP 3 x 3 inch meter 25.00 384,846.00 9,621,150.00
- Kabel dari Panel Lokal Filter 1 ke Limit switch Pneumatic Valve
- NYYHY 3 x 1,5 mm2 meter 50.00 22,638.00 1,131,900.00
- Kabel dari Panel Lokal Filter 2 ke Limit switch Pneumatic Valve
- NYYHY 3 x 1,5 mm2 meter 45.00 22,638.00 1,018,710.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Kabel dari Panel Lokal Filter 3 ke Limit switch Pneumatic Valve
- NYYHY 3 x 1,5 mm2 meter 40.00 22,638.00 905,520.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Kabel dari Panel Lokal Filter 4 ke Limit switch Pneumatic Valve
- NYYHY 3 x 1,5 mm2 meter 35.00 22,638.00 792,330.00
- Kabel dari Panel Lokal Filter 5 ke Limit switch Pneumatic Valve
- NYYHY 3 x 1,5 mm2 meter 33.00 22,638.00 747,054.00
- Kabel dari Panel Lokal Filter 6 ke Limit switch Pneumatic Valve
- NYYHY 3 x 1,5 mm2 meter 25.00 22,638.00 565,950.00
Jumlah 1,957,583,440.55

b Pemasangan kabel-kabel
Kabel dari PLN ke Panel TM, Primer Trafo, Sekunder Trafo, Genset, MDP ke masing - masing panel (Air Baku, Air bersih, Blower, Dosing, Panel Penerangan,
1
Genset )
- Dari meter PLN ke Panel TM (cubicle)
- Kabel XLPE 1 x 70 mm2 12/20/kV m 60.00 31,680.00 1,900,800.00
- Terminating kabel XLPE, 70 mm2 set 6.00 1,211,490.72 7,268,944.32
- Dari meter Panel TM (cubicle) ke primer trafo
- Kabel XLPE 1 x 70 mm2 12/20/kV m 30.00 31,680.00 950,400.00
- Terminating kabel XLPE, 70 mm2 set 6.00 1,211,490.72 7,268,944.32
- Dari Sekunder trafo ke Panel MDP
- Kabel NYY 1 x 500 mm2 m 80.00 31,680.00 2,534,400.00
- Dari Generator 2x625 kVA ke Panel MDP
- Kabel NYY 1 x 300 mm2 m 120.00 31,680.00 3,801,600.00
- Kabel NYY 1 x 500 mm2 m 40.00 31,680.00 1,267,200.00
- Kabel NYA 1 x 120 mm2 m 30.00 31,680.00 950,400.00
- Dari Panel MDP ke panel M-PK (Pompa Doosing Kimia)
- Kabel NYFGbY 4 x 16 mm2 m 183.00 31,680.00 5,797,440.00
- Kabel NYA 1 x 16 mm2 m 183.00 31,680.00 5,797,440.00
- Dari Panel MDP ke Panel M-FL (Filter)
- Kabel NYFGbY 4 x 35 mm2 m 102.00 31,680.00 3,231,360.00
- Kabel NYA 1 x 25 mm2 m 102.00 31,680.00 3,231,360.00
- Kabel NYFGbY 4 x 95 mm2 m 85.00 31,680.00 2,692,800.00
- Kabel NYA 1 x 70 mm2 m 85.00 31,680.00 2,692,800.00
- Dari Panel MDP ke panel DP - WS (Workshop)
- Kabel NYFGbY 4 x 35 mm2 m 183.00 31,680.00 5,797,440.00
- Kabel NYA 1 x 25 mm2 m 183.00 31,680.00 5,797,440.00
- Dari Panel MDP ke panel PC-AB (Air Bersih)
- Kabel NYFGbY 4 x 300 mm2 m 30.00 31,680.00 950,400.00
- Kabel NYA 1 x 120 mm2 m 30.00 31,680.00 950,400.00
- Dari Panel MDP ke panel PC-ABK (Air Baku)
- Kabel NYFGbY 4 x 300 mm2 m 80.00 31,680.00 2,534,400.00
- Kabel NYA 1 x 120 mm2 m 80.00 31,680.00 2,534,400.00
- Kabel NYFGbY 4 x 95 mm2 m 80.00 31,680.00 2,534,400.00
- Kabel NYA 1 x 70 mm2 m 80.00 31,680.00 2,534,400.00
- Dari MDP ke Panel TB-G (terminal Box Grounding)
- Kabel NYA 1 x 120 mm2 m 9.00 31,680.00 285,120.00
- Dari panel TB-G ke box control
- Kabel NYA 1 x 120 mm2 m 24.00 31,680.00 760,320.00
2 Kabel daya ke sub panel / panel penerangan
- Dari Panel MDP ke panel PP-RL
- Kabel NYY 4 x 4 mm2 m 7.00 31,680.00 221,760.00
- Kabel NYA 1 x 6 mm2 m 7.00 31,680.00 221,760.00
- Dari Panel M-PK ke panel PP-RJ (PP Ruang Jaga)
- Kabel NYFGbY 3 x 4 mm2 m 40.00 31,680.00 1,267,200.00
- Dari Panel M-PK ke panel PP-RK
- Kabel NYY 4 x 4 mm2 m 25.00 31,680.00 792,000.00
- Kabel NYA 1 x 6 mm2 m 25.00 31,680.00 792,000.00
- Dari Panel M-PK ke panel PP-KR
- Kabel NYY 4 x 6 mm2 m 20.00 31,680.00 633,600.00
- Kabel NYA 1 x 6 mm2 m 20.00 31,680.00 633,600.00
- Dari Panel PC-ABK ke panel PP-ABK
- Kabel NYY 4 x 4 mm2 m 7.00 31,680.00 221,760.00
- Kabel NYA 1 x 6 mm2 m 7.00 31,680.00 221,760.00
- Dari Panel F-FL ke panel PP - RL2
- Kabel NYY 4 x 6 mm2 m 7.00 31,680.00 221,760.00
- Kabel NYA 1 x 6 mm2 m 7.00 31,680.00 221,760.00
- Dari Panel M-FL ke panel PP-FL
- Kabel NYY 4 x 6 mm2 m 7.00 31,680.00 221,760.00
- Kabel NYA 1 x 6 mm2 m 7.00 31,680.00 221,760.00
- Dari Panel M-FL ke Panel PC-BWR
- Kabel NYY 4 x 4 mm2 m 150.00 31,680.00 4,752,000.00
- Kabel NYA 1 x 6 mm2 m 40.00 31,680.00 1,267,200.00
- Dari panel M-FL ke panel MOBV filter
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Kabel NYY 4 x 2.5 mm2 m 150.00 31,680.00 4,752,000.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Dari Panel M-FL ke panel PC-BWR
- Kabel NYFGbY 4 x 25 mm2 m 80.00 31,680.00 2,534,400.00
- Kabel NYA 1 x 25 mm2 m 80.00 31,680.00 2,534,400.00
- Dari Panel PC-BWR ke panel PP-BWR
- Kabel NYY 3x4 mm2 m 7.00 31,680.00 221,760.00
- Kabel NYA 1 x 6 mm2 m 7.00 31,680.00 221,760.00
- Dari Panel PC-BW ke panel PP-BW
- Kabel NYY 4 x 4 mm2 m 7.00 31,680.00 221,760.00
- Kabel NYA 1 x 6 mm2 m 7.00 31,680.00 221,760.00
- Dari Panel PC-AB ke panel PP-LR3
- Kabel NYFGbY 4 x 6 mm2 m 15.00 31,680.00 475,200.00
- Kabel NYA 1 x 6 mm2 m 15.00 31,680.00 475,200.00
- Dari panel PP - LR3 ke panel PP-PJ
- Kabel NYY 4 x 4 mm2 m 7.00 31,680.00 221,760.00
- Dari Panel PC-AB ke panel PP-AB
- Kabel NYY 4 x 4 mm2 m 7.00 31,680.00 221,760.00
- Kabel NYA 1 x 6 mm2 m 7.00 31,680.00 221,760.00
- Dari Panel PC-ABK ke panel PP-LR1
- Kabel NYFGbY 4 x 6 mm2 m 15.00 31,680.00 475,200.00
- Kabel NYA 1 x 6 mm2 m 15.00 31,680.00 475,200.00
2 Kabel daya dan kontrol dari masing - masing panel kontrol ke masing - masing motor, ukuran kabel sesuai dengan spesifikasi masing - masing motor
- Dari Panel PC -AB ke terminal motor, pompa Air Bersih
- Kabel NYY 3 x 70 mm2 m 120.00 31,680.00 3,801,600.00
- Kabel NYA 1 x 70 mm2 m 60.00 31,680.00 1,900,800.00
- Dari Panel PC -AB ke terminal motor, pompa backwash
- Kabel NYY 3 x 6 mm2 m 72.00 31,680.00 2,280,960.00
- Kabel NYA 1 x 6 mm2 m 36.00 31,680.00 1,140,480.00
- Dari Panel PC -ABK ke terminal motor, pompa air baku
- Kabel NYY 3 x 35 mm2 m 80.00 31,680.00 2,534,400.00
- Kabel NYA 1 x 35 mm2 m 20.00 31,680.00 633,600.00
- Dari Panel PC -ABK ke terminal motor blower
- Kabel NYY 3 x 6 mm2 m 40.00 31,680.00 1,267,200.00
- Kabel NYA 1 x 6 mm2 m 20.00 31,680.00 633,600.00
- Dari Panel PC -ABK ke terminal motor air compressor
- Kabel NYY 3 x 6 mm2 m 100.00 31,680.00 3,168,000.00
- Kabel NYA 1 x 6 mm2 m 12.00 31,680.00 380,160.00
- Dari Panel PC -ABK ke terminal motor mixer/pompa dosing/blower
- Kabel NYY 4 x 2.5 mm2 m 100.00 31,680.00 3,168,000.00
- Dari Panel PC -ABK ke local control panel (LCP-MX/BW/AL/SA)
- Kabel NYY 3 x 2.5 mm2 m 80.00 31,680.00 2,534,400.00
- Dari Panel PC -ABK ke masing-masing pneumatice valve
- Kabel NYY 3 x 2.5 mm2 m 600.00 31,680.00 19,008,000.00
- Dari Panel M-FL ke masing-masing pneumatice valve sludge drain
- Kabel NYY 3 x 2.5 mm2 m 100.00 31,680.00 3,168,000.00
- Dari Panel PC-ABK ke LCP-ABK 1/2/3
- Kabel NYY 3 x 2.5 mm2 m 66.00 31,680.00 2,090,880.00
Jumlah 146,960,288.64

c Pengadaan Lampu Penerangan Luar


1 Dari panel PP-LR1
- Lampu LED 56W with aluminium housing, termasuk MCB d set 17.00 2,464,000.00 41,888,000.00
- Tiang lampu hot dip galvanis 6 m set 17.00 2,200,000.00 37,400,000.00
- Kabel NYFGbY 3 x 4 mm2 m 15.00 26,950.00 404,250.00
- Kabel NYFGbY 3 x 2,5 mm2 m 185.00 18,700.00 3,459,500.00
- Kabel NYFGbY 2 x 2,5 mm2 m 100.00 15,950.00 1,595,000.00
- GIP 2" m 6.00 123,200.00 739,200.00
2 Dari panel PP-LR2
- Lampu LED 56W with aluminium housing, termasuk MCB d set 17.00 2,464,000.00 41,888,000.00
- Tiang lampu hot dip galvanis 6 m set 17.00 2,200,000.00 37,400,000.00
- Kabel NYFGbY 4 x 4 mm2 m 30.00 31,900.00 957,000.00
- Kabel NYFGbY 3 x 4 mm2 m 50.00 26,950.00 1,347,500.00
- Kabel NYFGbY 3 x 2,5 mm2 m 50.00 18,700.00 935,000.00
- Kabel NYFGbY 4 x 2,5 mm2 m 60.00 22,000.00 1,320,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 40.00 15,950.00 638,000.00
3 Dari panel PP-LR3
- Lampu LED 56W with aluminium housing, termasuk MCB d set 17.00 2,464,000.00 41,888,000.00
- Kabel NYFGbY 3 x 2,5 mm2 m 150.00 18,700.00 2,805,000.00
- Kabel NYFGbY 4 x 4 mm2 m 50.00 31,900.00 1,595,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 220.00 15,950.00 3,509,000.00
- 5. GIP 2" m 6.00 123,200.00 739,200.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
Jumlah 220,507,650.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
d Pemasangan Lampu Penerangan Luar
1 Dari panel PP-LR1
- Lampu LED 56W with aluminium housing, termasuk MCB da set 17.00 807,660.48 13,730,228.16
- Kabel NYFGbY 3 x 4 mm2 m 15.00 30,800.00 462,000.00
- Kabel NYFGbY 3 x 2,5 mm2 m 185.00 30,800.00 5,698,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 100.00 30,800.00 3,080,000.00
2 Dari panel PP-LR2
- Lampu LED 56W with aluminium housing, termasuk MCB da set 17.00 807,660.48 13,730,228.16
- Kabel NYFGbY 4 x 4 mm2 m 30.00 30,800.00 924,000.00
- Kabel NYFGbY 3 x 4 mm2 m 50.00 30,800.00 1,540,000.00
- Kabel NYFGbY 3 x 2,5 mm2 m 50.00 30,800.00 1,540,000.00
- Kabel NYFGbY 4 x 2,5 mm2 m 60.00 30,800.00 1,848,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 40.00 30,800.00 1,232,000.00
3 Dari panel PP-LR3
- Lampu LED 56W with aluminium housing, termasuk MCB d set 17.00 807,660.48 13,730,228.16
- Kabel NYFGbY 3 x 2,5 mm2 m 150.00 30,800.00 4,620,000.00
- Kabel NYFGbY 4 x 4 mm2 m 50.00 30,800.00 1,540,000.00
- Kabel NYFGbY 2 x 2,5 mm2 m 220.00 30,800.00 6,776,000.00
Jumlah 70,450,684.48

e Pekerjaan Grounding Sistem, Listrik PLN, Uji Komisioning Sistem Elektrikal


1 Pengadaan dan pemasangan grounding system
Grounding system di seluruh IPA, komplit dengan box
- kontrol sesuai gambar termasuk grounding peralatan, LS 1.00 7,268,944.32 7,268,944.32
electronic dan instrumentasi
2 Penyambungan Listrik PLN
- Uang Jaminan Pelanggan VA 1,385,000.00 272.25 377,066,250.00
- Biaya penyambungan VA 1,385,000.00 555.50 769,367,500.00
- Biaya installatir termasuk Sertifikasi Laik Operasi VA 1,385,000.00 145.20 201,102,000.00
- Biaya konstruksi dan peralatan penunjang LS 1.00 226,671,423.94 226,671,423.94
- Uji Komisioning Sistem Elektrikal LS 1.00 266,200,000.00 266,200,000.00
Jumlah 1,847,676,118.26

4 Pengadaan dan Pemasangan Instrumentasi dan Sistem Otomasi


1 IPA dan Pembubuh Kimia

Water level Sensor, Type Ultrasonik, Akurasi 0.2 % dari


- Range ukuran, Output 4 - 20 mA, support output to scada unit 6.00 21,787,590.00 130,725,540.00
system, instalasi to marshasling panel (backwash)

Chlorine Analyzer Free Reagent, output 4 - 20mA,


- support output to scada system, instalasi to marshasling unit 1.00 45,116,060.00 45,116,060.00
panel (backwash)

Residual Chlorine Analyzer, support output to scada


- system, instalasi to marshasling panel ( backwahs ) bisa unit 1.00 283,283,990.00 283,283,990.00
di aplikasikan di semua area pengolahan air

8 Core Singlemode Outdoor Direct Buried, Double


- m 250.00 17,325.00
Jacket 9/125um 4,331,250.00
- Fibre optic splitter set 12.00 687,500.00 8,250,000.00
Patchcord Duplex Singlemode 9um/125um, 3 meter
- set 12.00 165,000.00 1,980,000.00
(LSZH)
- Network cable UTP Cat5 m 80.00 10,802.36 864,189.04
- Pigtail ST Singlemode, 1 meter set 10.00 18,150.00 181,500.00
8-port 10/100/1000 Managed Gigabit Switch with
- set 4.00 3,888,500.00 15,554,000.00
WebView
- Cable tray 200x50x2400x1.2mm dan penutup set 80.00 290,950.00 23,276,000.00
2 Reservoir IPA
Elektromagnetik Flowmeter dengan Akurasi 0.35 % dari
pembacaan, Output 4 - 20 mA, Bahasa komunikasi
- Hartcomm, Bahan Lining PFA, DN 300 with display, unit 3.00 41,150,560.00 123,451,680.00
flange type, support output to scada system, instalasi to
marshasling panel
Turbidity Analyzer Output 4 - 20 mA, Bahasa
- komunikasi Hartcomm, 0-10000 ntu, support output to unit 1.00 92,883,340.00 92,883,340.00
scada system, instalasi to marshasling panel

Digital pH Meter, Output 4 - 20 mA, Bahasa komunikasi


- Hartcomm, support output to scada system, instalasi to unit 1.00 17,108,300.00 17,108,300.00
marshasling panel

Pressure Transmitter dengan Akurasi 0.065 % dari span,


Output 4 - 20 mA, Bahasa komunikasi Hartcomm,
- unit 1.00 9,109,320.00 9,109,320.00
support output to scada system, instalasi to marshasling
panel
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6

Water level Sensor, Tipe Ultrasonic, Akurasi 0.2 % dari


- Range ukur, Output 4 - 20 mA, support output to scada unit 2.00 20,903,850.00 41,807,700.00
system, instalasi to marshasling panel

Chlorine Analyzer Free Reagent, output 4 - 20mA,


- support output to scada system, instalasi to marshasling unit 1.00 45,116,060.00 45,116,060.00
panel (backwash)

Residual Chlorine Analyzer, support output to scada


- system, instalasi to marshasling panel ( backwahs ) bisa unit 1.00 45,116,060.00 45,116,060.00
di aplikasikan di semua area pengolahan air

8 Core Singlemode Outdoor Direct Buried, Double


- m 250.00 17,325.00 4,331,250.00
Jacket 9/125um

- Fibre optic splitter set 12.00 687,500.00 8,250,000.00

- Patchcord Duplex Singlemode 9um/125um, 3 meter (LSZ set 12.00 165,000.00 1,980,000.00
- Network cable UTP Cat5 m 80.00 10,802.36 864,189.04
- Pigtail ST Singlemode, 1 meter set 10.00 18,150.00 181,500.00
8-port 10/100/1000 Managed Gigabit Switch with
- set 4.00 3,888,500.00 15,554,000.00
WebView
- Cable tray 200x50x2400x1.2mm dan penutup set 80.00 290,950.00 23,276,000.00
3 Reservoir Distribusi
- Elektromagnetik Flowmeter dengan Akurasi 0.35 % dari pe unit 3.00 41,150,560.00 123,451,680.00
- Turbidity Analyzer Output 4 - 20 mA, Bahasa komunikasi H unit 1.00 92,883,340.00 92,883,340.00
- Digital pH Meter, Output 4 - 20 mA, Bahasa komunikasi Ha unit 1.00 17,108,300.00 17,108,300.00
- Pressure Transmitter dengan Akurasi 0.065 % dari span, O unit 1.00 9,109,320.00 9,109,320.00
- Water level Sensor, Tipe Ultrasonic, Akurasi 0.2 % dari Ra unit 2.00 20,903,850.00 41,807,700.00
- Chlorine Analyzer Free Reagent, output 4 - 20mA, support unit 1.00 45,116,060.00 45,116,060.00
- Residual Chlorine Analyzer, support output to scada system unit 1.00 45,116,060.00 45,116,060.00
- GSM GPRS Communication Module and Interface, Quad B unit 2.00 6,270,000.00 12,540,000.00
- 8 Core Singlemode Outdoor Direct Buried, Double Jacket m 250.00 17,325.00 4,331,250.00
- Fibre optic splitter set 12.00 687,500.00 8,250,000.00
- Patchcord Duplex Singlemode 9um/125um, 3 meter (LSZ set 12.00 165,000.00 1,980,000.00
- Network cable UTP Cat5 m 80.00 10,802.36 864,189.04
- Pigtail ST Singlemode, 1 meter set 10.00 18,150.00 181,500.00
- 8-port 10/100/1000 Managed Gigabit Switch with WebVi set 4.00 3,888,500.00 15,554,000.00
- Cable tray 200x50x2400x1.2mm dan penutup set 80.00 290,950.00 23,276,000.00
- Elektromagnetik Flowmeter dengan Akurasi 0.35 % dari pe unit 1.00 510,400,000.00 510,400,000.00
4 Sistem Otomasi
Hardware support Redundancy system, meliputi Base
Modul, AI/AO, DI/DO sesuai system konfigurasi dan
- set 1.00 553,810,400.00 553,810,400.00
I/O, Server, Workstation, Comm Modem, Printer, Panel
and Marshalling cabinet dan accessories

Stardom Software media, HMI software and other


- set 1.00 363,466,400.00 363,466,400.00
support software, Auto Backup
Engineering dan Generation for FCX function, MMI
- Display and MMI Operator Utility Function (Estimate set 1.00 228,866,000.00 228,866,000.00
graphi Panel 10 pages)
- Pemasangan dan supporting material set 1.00 171,058,250.00 171,058,250.00
FAT, SAT, Uji komisioning Sistem Otomasi, gambar,
- set 1.00 455,466,000.00 455,466,000.00
buku manual OP, pelatihan operator
Jumlah 3,667,228,377.12

- PEKERJAAN PERALATAN KANTOR, LAB DAN WORKSHOP 205,693,950.00


1 Pengadaan AC dan APAR
- Air Condition Unit 2 PK Ruang Kendali Operasional unit 4.00 9,746,000.00 38,984,000.00
- Air Condition Unit 1 PK R. Kepala Kantor unit 1.00 4,708,000.00 4,708,000.00
- Air Condition Unit 1.5 PK unit 1.00 5,445,000.00 5,445,000.00
- Fire Extinguisher 6 kg (APAR) tipe ABC Chemical Dry at unit 3.00 4,525,400.00 13,576,200.00
- Fire Extinguisher 3 kg (APAR) tipe ABC Chemical Dry at unit 1.00 2,928,200.00 2,928,200.00
- Air Condition Unit 1 PK ex. Daikin u/ R.Staf unit 1.00 4,708,000.00 4,708,000.00
- Air Condition Unit 2 PK ex. Daikin u/ R.Lobby unit 1.00 9,746,000.00 9,746,000.00
- Air Condition Unit 3/4 PK ex. Daikin Class unit 2.00 4,455,000.00 8,910,000.00
Jumlah 89,005,400.00

2 Pemasangan AC dan APAR


- Air Condition Unit 2 PK Ruang Kendali Operasional unit 1.00 242,220.00 242,220.00
- Air Condition Unit 1 PK R. Kepala Kantor unit 1.00 242,220.00 242,220.00
- Air Condition Unit 1.5 PK unit 1.00 242,220.00 242,220.00
- Fire Extinguisher 6 kg (APAR) tipe ABC Chemical Dry at unit 3.00 242,220.00 726,660.00
- Fire Extinguisher 3 kg (APAR) tipe ABC Chemical Dry at unit 1.00 242,220.00 242,220.00
- Air Condition Unit 1 PK ex. Daikin u/ R.Staf unit 1.00 242,220.00 242,220.00
- Air Condition Unit 2 PK ex. Daikin u/ R.Lobby unit 1.00 242,220.00 242,220.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
- Air Condition Unit 3/4 PK ex. Daikin Class unit 1.00 242,220.00 242,220.00
Jumlah 2,422,200.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
3 Pengadaan dan Pemasangan Peralatan Laboratorium IPA
- PH Meter Printer unit 2.00 532,400.00 1,064,800.00
- Jar Test 6 Spindel dengan lampu tabung unit 2.00 2,662,000.00 5,324,000.00
- Spektrofotometer UV-VIS unit 1.00 1,996,500.00 1,996,500.00
- Timbangan Analitik (0,001) unit 1.00 2,262,700.00 2,262,700.00
- Konduktometer unit 1.00 1,064,800.00 1,064,800.00
- Pipet Tetes unit 5.00 266,200.00 1,331,000.00
- Beaker Glass unit 5.00 532,400.00 2,662,000.00
- Beaker Glass unit 10.00 798,600.00 7,986,000.00
- Gelas Ukur unit 3.00 266,200.00 798,600.00
- Tabung Reaksi unit 12.00 2,662,000.00 31,944,000.00
- Rak Tabung Reaksi unit 2.00 1,331,000.00 2,662,000.00
- Erlenmeyer unit 4.00 1,597,200.00 6,388,800.00
- Erlenmeyer unit 4.00 3,194,400.00 12,777,600.00
- Erlenmeyer unit 5.00 5,590,200.00 27,951,000.00
- Spatula unit 2.00 2,662,000.00 5,324,000.00
- Jas Laboratorium set 4.00 266,200.00 1,064,800.00
- Corong Imhof + rak isi 4 buah set 1.00 199,650.00 199,650.00
- Pipet Volume + karet penghisap set 4.00 299,475.00 1,197,900.00
- Stop watch unit 2.00 133,100.00 266,200.00
Jumlah 114,266,350.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT.
VOLUME ( Rp ) ( Rp )
1 2 3 4 5 6

PEKERJAAN IPA KAPASITAS 165 LT/DT (SIPIL)

1,000,000.00
A PEKERJAAN PERSIAPAN DAN UMUM
I Persiapan dan Pekerjaan Sementara

Mobilisasi semua alat berat, mesin - mesin, peralatan dan tenaga ahli
1 1 Unit - -
yang diperlukan untuk pelaksanaan pekerjaan

Bangunan kantor kontraktor, workshop, gudang, tempat tinggal staf


dan tenaga kerja, serta fasilitas/bangunan lainnya termasuk furniture,
2 1 Unit - -
penerangan, AC dan tempat parkir yang diperlukan untuk
pelaksanaan pekerjaan.

3 Papan nama proyek 1 bh 1,000,000.00 1,000,000.00

4 Pengendalian lalu-lintas pada jalan umum, keamanan dan manajemen 1 Unit - -


lapangan

II Survey dan penyelidikan bawah tanah


1 Test pit ttk 10.00 - -
2 Penyediaan lokasi pembuangan hasil galian ls 1.00 - -

3 Pembersihan semua fasilitas sementara, Pemindahan ls 1.00 - -


mesin/peralatan, material sisa dan sebagainya
JUMLAH
1,000,000.00

B PEKERJAAN BANGUNAN SIPIL ###


- PEKERJAAN BANGUNAN IPA KAPASITAS 165 LT/DT #REF!

1 PEKERJAAN TANAH LUAS


1 Pengukuran dan Pasang Bowplank m' 132.70 - -
2 Galian Tanah dengan Excavator m3 389.56 - -
3 Urugan Pasir m3 69.11 - -
Jumlah -

2 PEKERJAAN STRUKTUR ATAU SIPIL DAN ASITEKTUR


a Pekerjaan Pasangan dan Beton
1 Pekerjaan Pasangan Batu Kosong m3 4.45 - -
2 Pekerjaan Pasangan Batu Kali Campuran 1 : 4 m3 7.71 - -
3 Lantai Kerja K 125 ( 1 pc : 3 ps : 5 Kr) m3 30.96 - -
4 Pekerjaan Beton Bor Pile
- Galian Tanah dengan Bor Ø 40 mm m' 200.00 #REF! #REF!
- Beton K 300 m3 24.50 - -
- Pembesian kg 3,743.16 - -
5 Pekerjaan Beton Pondasi Plat Kaki
- Beton K 300 m3 2.98 - -
- Pembesian kg 2,070.56 - -
- Begesting Batako m2 11.70 - -
6 Pekerjaan Beton Sloop
- Beton K 300 m3 6.18 - -
- Pembesian kg 848.18 - -
- Begesting 2x Pakai m2 41.20 - -
7 Pekerjaan Beton Standing Colum
- Beton K 300 m3 3.68 - -
- Pembesian kg 839.09 - -
- Begesting 2x Pakai m2 21.00 - -
8 Pekerjaan Beton Lantai
- Beton K 300 m3 287.93 - -
- Pembesian kg 55,829.00 - -
9 Pekerjaan Beton Dinding, Gutter, dan Plat Jalan Setapak
- Beton K 300 m3 839.30 - -
- Pembesian kg 100,032.99 - -
- Begesting 2x Pakai m2 4,883.65 - -
- Tie Rot m' 1,306.00 68,500.00 89,461,000.00
- Water Sttop W 300 mm m' 1,801.67 - -
10 Pekerjaan Beton Balok
- Beton K 300 m3 42.47 - -
- Pembesian kg 7,022.79 - -
- Begesting 2x Pakai m2 406.25 - -
11 Pekerjaan Beton Colum
- Beton K 300 m3 76.27 - -
- Pembesian kg 22,358.04 - -
- Begesting 2x Pakai m2 996.58 - -
12 Pekerjaan Beton Plat Atap
- Beton K 300 m3 55.76 - -
- Pembesian kg 10,895.18 - -
- Begesting 1x Pakai m2 361.57 - -
13 Pekerjaan Beton Plat Nozel
- Beton K 300 m3 14.51 - -
- Pembesian kg 3,861.37 - -
- Begesting 1x Pakai m2 96.72 - -
14 Pekerjaan Beton Tangga
- Beton K 300 m3 7.69 - -
- Pembesian kg 2,243.89 - -
- Begesting 1x Pakai m2 59.66 - -
- Begesting Batako m2 3.72 - -
15 Pekerjaan Beton Saluran
- Beton K 300 m3 75.94 - -
- Pembesian kg 6,969.96 - -
- Begesting 1x Pakai m2 669.06 - -
16 Pekerjaan Dudukan Pipa dan Pompa
- Beton K 300 m3 0.39 - -
- Pembesian kg 182.44 - -
- Begesting 2x Pakai m2 4.68 - -
17 Pekerjaan Pasangan Bata 1 : 4 m2 271.51 - -
18 Pekerjaan Plesteran m2 554.56 - -
19 Pek. Acian m2 1,158.07 - -

Jumlah #REF!

b Pekerjaan Rangka Baja dan Atap


1 Pekerjaan Rangka Atap Baja WF kg 8,447.39 - -
2 Pek. Rangka Atap Baja Ringan m2 119.70 190,000.00 22,743,000.00
3 Pekerjaan Gording Canal kg 2,332.84 - -
4 Pek. Sagrood Ø 12mm kg 18.00 - -
5 Pek. Track Stang Ø 12mm kg 58.83 - -
6 Pek. Plat Baja kg 114.11 - -
7 Pek. Baut Mur 16mm m2 352.00 - -
8 Pek. Baut Angker M22, L = 60 cm m' 176.00 - -
9 Pek. Atap Spandek 0.3mm m 273.81 Err:509 Err:509
10 Pek. Bubungan Spandek bh 30.30 Err:509 Err:509
11 Pek. Atap Genteng m2 127.15 - -
12 Pek. Bubungan Genteng m' 31.35 - -
13 Pekerjaan Pasang Lisplank m' 91.94 - -
14 Pek. Tatab m' 46.60 - -
15 Pek. Murda bh 2.00 - -
16 Pek. Ikut Celedu bh 4.00 - -
Jumlah Err:509

c Pekerjaan Kusen Pintu dan Jendela


1 Pekerjaan Kusen Pintu dan Jendela Aluminium m 76.320 - -
2 Pekerjaan Daun Pintu Aluminium m2 3.780 - -
3 Pekerjaan Daun Jendela Aluminium Panil Kaca m2 17.744 - -
4 Pekerjaan Kusen Pintu Besi Profil C NP m 7.00 - -
5 Pekerjaan Daun Pintu Besi rangka L 50.50.5 m2 3.99 - -
6 Pasang Engsel Pintu baja As 1" pasang 3.00 - -
7 Pasang Kunci Pintu Baja pasang 1.00 - -
8 Pasang Grendel Tanam untuk Pintu baja Set 2.00 - -
9 Pasang Engsel Pintu pasang 4.000 - -
10 Pasang Kunci Pintu pasang 2.000 - -
11 Pasang Grendel Pintu pasang 2.000 - -
12 Pasang Engsel Jendela pasang 48.000 - -
13 Pasang Grendel Jendela pasang 12.000 - -
14 Pasang Kait Angin pasang 24.000 - -
15 Pekerjaan Penutup Man Hole Plat Besi T=1,2 mm bh 2.00 Err:509 Err:509
16 Pekerjaan Grill Penutup Besi Strip 30x3 mm m2 30.40 1,087,936.03 33,073,255.16
17 Pekerjaan Railing m' 383.73 Err:509 Err:509
Jumlah Err:509
d Pekerjaan Finishing
1 Pekerjaan Pengecatan Dinding m2 306.875 - -
2 Pekerjaan Politur Lisplank m2 13.79 - -
3 Pekerjaan Pengecatan Rangka Baja m2 115.74 - -
4 Meni dan Cat Besi m2 7.98 - -
5 Ornamen Ukir Style Bali m2 15.24 3,129,740.63 47,697,247.13
6 Pekerjaan Waterproofing m2 3,913.61 - -
7 Pekerjaan Pasangan Keramik Lantai m2 53.71 - -
8 Pekerjaan Lapis Keramik pada Gutter m2 221.79 - -
Jumlah 47,697,247.13

- PEKERJAAN BANGUNAN PENGELOLA #REF!


1 PEKERJAAN TANAH LUAS
1 Galian Tanah dengan excavator m3 43.66 - -
2 Pengukuran dan Bouwplank m' 327.44 - -
3 Urugan Tanah Kembali dengan Pemadatan m3 191.54 - -
4 Urugan Pasir t = 10 cm m3 15.64 - -
Jumlah -
2 PEKERJAAN STRUKTUR ATAU SIPIL DAN ASITEKTUR
a Pekerjaan Beton
1 Pekerjaan Beton Rabat K125 m3 4.73 - -
2 Pekerjaan Pondasi Bor Pile
- Pembuatan lubang Bor Pile Ø 40 cm m 8.06 #REF! #REF!
- Beton Cor K-300 m3 1,033.02 - -
- besi Beton Kg 26.88 - -
3 Pekerjaan Beton Pondasi Plat Kaki R. Pengelola
- Beton Cor K-225 m3 8.62 - -
- Pekerjaan Besi Beton Kg 1,822.37 - -
- Pekerjaan Begesting 2 X pakai m2 114.91 - -
4 Beton Kolom Lt 1 R. Pengelola
- Beton Cor K-225 m3 6.21 - -
- Pekerjaan Besi Beton Kg 1,693.73 - -
- Pekerjaan Begesting 2 X pakai m2 50.76 - -
5 Balok Sloof ( S1 dan SP ) R. Pengelola
- Beton Cor K-225 m3 6.36 - -
- Pekerjaan Besi Beton Kg 2,057.17 - -
- Pekerjaan Begesting 2 X pakai m2 76.67 - -
6 Balok Lantai 1 ( B1 & TP ) R.Pengelola
- Beton Cor K-225 m3 5.63 - -
- Pekerjaan Besi Beton Kg 1,153.03 - -
- Pekerjaan Begesting 2 X pakai m2 59.67 - -
7 Beton Balok Lt.2 R. Pengelola
- Beton Cor K-225 m3 12.00 - -
- Pekerjaan Besi Beton Kg 1,542.18 - -
- Pekerjaan Begesting 2 X pakai m2 100.00 - -
8 Beton Plat Lantai 2 R. Pengelola
- Beton Cor K-225 m3 6.31 - -
- Pekerjaan Besi Beton Kg 606.63 - -
- Pekerjaan Begesting 2 X pakai m2 91.08 - -
9 Beton Plat Lantai 2 R. Pengelola ( T10-01)
- Beton Cor K-225 m3 2.63 - -
- Pekerjaan Besi Beton Kg 762.98 - -
- Pekerjaan Begesting 2 X pakai m2 20.78 - -
10 Beton Tangga R. Pengelola
- Beton Cor K-225 m3 6.44 - -
- Pekerjaan Besi Beton Kg 1,367.89 - -
- Pekerjaan Begesting 2 X pakai m2 85.85 - -
11 Beton Kolom Lt 2 R. Pengelola
- Beton Cor K-225 m3 2.89 - -
- Pekerjaan Besi Beton Kg 642.62 - -
- Pekerjaan Begesting 2 X pakai m2 31.35 - -
12 Beton Ring Balok R. Pengelola
- Beton Cor K-225 m3 0.81 - -
- Pekerjaan Besi Beton Kg 267.29 - -
- Pekerjaan Begesting 2 X pakai m2 21.56 - -
13 Beton Kolom Praktis R. Pengelola
- Beton Cor K-225 m3 4.32 - -
- Pekerjaan Besi Beton Kg 215.80 - -
- Pekerjaan Begesting 2 X pakai m2 19.80 - -
Jumlah #REF!
b Pekerjaan Pasangan dan Dinding
1 Pekerjaan Dinding Pasangan Bata 1:4 m2 272.67 - -
2 Pekerjaan Dinding Pasangan Bata 1:2 m2 39.10 - -
3 Pekerjaan Plesteran 1:4 m2 545.34 - -
4 Pekerjaan Plesteran 1:2 m2 78.20 - -
5 Pekerjaan Acian Dinding m2 623.54 - -
6 Pekerjaan Pas. Keramik Lantai 40 x 40 m2 157.56 - -
7 Pekerjaan lantai keramik stepnozing m1 24.50 - -
8 Pek. Pasangan Batu Paras Sangsit m2 105.40 - -
9 Ornamen ukir style bali m2 13.93 - -
10 Pekerjaan Pasangan Batu Kosong m3 14.04 - -
11 Pekerjaan Pondasi Batu Kali m3 45.59 - -
12 Pekerjaan Pas. Keramik dinding 20 x 60 m2 33.13 - -
13 Pek. Pas Keramik Lantai 30 x 30 Cm m2 6.56 - -
14 Pekerjaan Pas. Keramik plin 10 x 40 m1 110.46 - -
15 Pekerjaan Pasangan Pepalihan Style Bali m2 219.86 - -
Jumlah -

c Pekerjaan Kusen, Pintu dan Jendela


1 Pekerjaan Kusen Pintu dan Jendela Aluminium m 203.00 - -
2 Pekerjaan Kusen Pintu Kayu Kamfer m³ 5.65 - -
3 Talang air hujan m 17.18 - -
4 Daun Pintu bingkai Allumunium m2 14.81 - -
5 Daun Pintu Kamfer m2 2.57 - -
6 Jendela Kaca Bingkai Alumunium m2 42.04 - -
7 Pasang Engsel Pintu pasang 20.00 - -
8 Pasang Engsel Jendela pasang 32.00 - -
9 Pasang Kunci Pintu pasang 8.00 - -
10 Pasang Grendel Jendela pasang 32.00 - -
11 Pasang Kait Angin pasang 32.00 - -
Jumlah -

d Pekerjaan Atap dan Plafond


1 Pekerjaan Kap Baja Ringan m2 80.30 175,000.00 14,052,937.50
2 Pasang Atap Genteng Keramik glasur m2 152.49 - -
3 Pasang Genteng Bubungan Keramik glasur m 45.81 - -
4 Pek. Pasang Listplank Kayu kanfer Profil m 72.80 - -
5 Murda Paras Ukir unit 3.00 - -
6 Ikut Celedu Paras Ukir unit 8.00 - -
7 Pekerjaan Plafond Gypsum Rangka Hollow m2 135.38 - -
8 Pekerjaan list Plafond m 152.78 - -
9 Pekerjaan Railing Tangga dan Balkon (Stainless Steel) m 8.87 Err:509 Err:509
10 Pek. Lambesering m2 72.21 - -
11 Pek. List Plafond Lambesering m 67.12 - -
Jumlah Err:509

e Pekerjaan Finishing
1 Pekerjaan Pengecatan Dinding Luar m2 201.79 - -
2 Pekerjaan Pengecatan Dinding Dalam m2 478.79 - -
3 Pekerjaan Pengecatan Plafond m2 135.38 - -
4 Pekerjaan Polituran Listplank m2 73.33 - -
5 Pekerjaan Pengecatan Rangka Baja m2 343.60 - -
6 Pekerjaan Polituran Lambesering m2 72.21 - -
Jumlah -

f Pekerjaan Toilet
1 Instalasi Plumbing Air Bersih m 25.00 42,900.00 1,072,500.00
2 Instalasi Plumbing Air Kotor m 36.00 231,170.50 8,322,138.00
3 Closet duduk bh 2.00 - -
4 Pasang Washtafel set 2.00 - -
5 Pasang Floor Drain set 2.00 - -
6 Pasang Kran air set 4.00 - -
Jumlah 9,394,638.00

- PEKERJAAN BANGUNAN KIMIA DAN CHLORINE 60,389,226.87


1 PEKERJAAN TANAH ###
1 Pengukuran dan Pasang Bowplank m' 66.20 - -
2 Galian Tanah dengan Excavator m3 91.79 - -
3 Urugan Tanah Kembali dengan Pemadatan m3 27.59 - -
4 Urugan Pasir m3 11.65 - -
Jumlah -
2 PEKERJAAN STRUKTUR ATAU SIPIL DAN ASITEKTUR
a Pekerjaan Beton
1 Lantai Kerja K 125 ( 1 pc : 3 ps : 5 Kr) m3 7.40 - -
2 Pondasi Beton Plat Kaki
- Beton K 300 m3 4.95 - -
- Pembesian kg 781.16 - -
- Begesting Batako m2 19.80 - -
3 Balok Dasar Sloof
- Beton K 300 m3 6.42 - -
- Pembesian kg 926.15 - -
- Begesting 2x Pakai m2 64.16 - -
4 Beton Kolom
- Beton K 300 m3 12.05 - -
- Pembesian kg 2,449.06 - -
- Begesting 2x Pakai m2 163.03 - -
5 Beton Balok
- Beton K 300 m3 16.52 - -
- Pembesian kg 3,246.20 - -
- Begesting 2x Pakai m2 177.67 - -
6 Plat Lantai
- Beton K 300 m3 7.25 - -
- Pembesian kg 1,225.38 - -
7 Plat Atap
- Beton K 300 m3 12.22 - -
- Pembesian kg 2,617.31 - -
- Begesting 1x Pakai m2 101.82 - -
8 Beton Dudukan Tabung dan Bak Pencampur
- Beton K 300 m3 4.42 - -
- Pembesian kg 804.74 - -
- Begesting 2x Pakai m2 56.51 - -
9 Beton Lisplank
- Beton K 300 m3 2.26 - -
- Pembesian kg 970.54 - -
- Begesting 2x Pakai m2 73.46 - -
Jumlah -

b Pekerjaan Pasangan dan Pelapis


1 Pekerjaan Pasangan Batu Kosong m3 16.98 - -
2 Pekerjaan Pasangan Batu Kali 1:4 m3 28.65 - -
3 Pekerjaan PasanganDinding Bata 1:2 m2 435.61 - -
4 Pekerjaan Plesteran Dinding 1:2 m2 37.35 - -
5 Pekerjaan Plesteran Dinding 1 PC : 5 Ps m2 833.88 - -
6 Pekerjaan Acian Dinding m2 833.88 - -
7 Pekerjaan Pasangan Keramik Lantai 40 x 40 cm m2 833.88 - -
8 Pek. Pasangan Batu Paras Sangsit m2 40.53 - -
9 Pekerjaan Lapisan Fiber Glass (2 x Lapis) m2 39.51 507,788.60 20,064,555.62
10 Pekerjaan Plafond Gypsum Rangka Hollow m2 206.66 - -
11 Pekerjaan list Plafond m 78.46 - -
12 Pekerjaan Pas. Keramik lantai 30 x 30 m2 70.45 - -
13 Pas. Keramik 20x30 cm m2 4.30 - -
14 Pek. Pasangan Keramik Dinding KM 20 x 25 Cm m2 17.43 - -
15 Pas. Stepnozing m' 8.30 - -
16 Pekerjaan Toilet
- Instalasi Plumbing Air Bersih m 20.00 42,900.00 858,000.00
- Instalasi Plumbing Air Kotor m 15.00 231,170.50 3,467,557.50
- Pasang Closet Duduk bh 1.00 - -
- Pasang Washtafel set 1.00 - -
- Pasang Floor Drain set 1.00 - -
- Pasang Kran air set 1.00 - -
- Pekerjaan Septick Tank dan peresapan unit 1.00 - -
- Pompa Air Bersih unit 1.00 3,850,000.00 3,850,000.00
Jumlah 28,240,113.12
c Pekerjaan Atap
1 Pekerjaan Atap Baja Ringan m2 167.96 190,000.00 31,912,400.00
2 Pekerjaan Pasangan Atap Genteng m2 115.60 - -
3 Pekerjaan Pas Bubungan m' 42.29 - -
4 Pekerjaan Pas. Ikut Celedu unit 4.00 - -
5 Pekerjaan Pas. Murda unit 2.00 - -
6 Pekerjaan Pas. Listplank m' 125.92 - -
7 Pekerjaan Pas. Tatab m' 63.40 - -
8 Pek. Cat Listplank m2 31.48 - -
Jumlah 31,912,400.00
d Pekerjaan Kusen, Pintu, Jendela dan Relling
1 Pekerjaan Kusen Pintu dan Jendela Aluminium m 20.480 - -
2 Pekerjaan Daun Pintu Aluminium m2 3.21 - -
3 Pekerjaan Daun Jendela Aluminium Panil Kaca m2 2.45 - -
4 Pekerjaan Kusen Kayu m3 0.02 - -
5 Pekerjaan Daun Jendela Jalusi m2 0.35 676,325.00 236,713.75
6 Pekerjaan Kusen Pintu Besi Profil C NP m 26.10 - -
7 Pekerjaan Daun Pintu Besi rangka L 50.50.5 m2 34.32 - -
8 Pasang Engsel Pintu pasang 2.00 - -
9 Pasang Engsel Jendela pasang 8.00 - -
10 Pasang Handle dan Kunci Pintu pasang 1.00 - -
11 Pasang Grendel Jendela pasang 4.00 - -
12 Pasang Kait Angin pasang 8.00 - -
13 Pasang Engsel Pintu baja As 1" pasang 12.00 - -
14 Pasang Kunci Pintu Baja pasang 2.00 - -
15 Pasang Grendel Tanam untuk Pintu baja Set 4.00 - -
Jumlah 236,713.75

e Pekerjaan Cat
1 Meni dan Cat Besi m2 68.64 - -
2 Plamur dan Cat Tembok m2 833.88 - -
3 Pekerjaan Pengecatan Plafond m2 206.66 - -
Jumlah -

- PEKERJAAN SIPIL BANGUNAN GENSET Err:509


1 PEKERJAAN TANAH
1 Pengukuran dan Pasang Bowplank m' 50.65 - -
2 Galian Tanah dengan excavator m3 354.93 - -
3 Urugan Tanah Kembali dengan Pemadatan m3 224.44 - -
4 Urugan Pasir di bawah lantai m3 13.93 - -
5 Urugan Pasir di bawah Pondasi t = 10 cm m3 38.00 - -
Jumlah -

2 PEKERJAAN STRUKTUR ATAU SIPIL DAN ASITEKTUR


a Pekerjaan Pasangan dan Beton
1 Pekerjaan Pasangan Batu Kosong m3 8.40 - -
2 Pekerjaan Pasangan Pondasi Batu Kali m3 42.10 - -
3 Pekerjaan Beton Rabat
- Cor Beton K125 m3 7.01 - -
4 Pekerjaan Beton pondasi Plat kaki
- Beton Cor K-225 m3 5.83 - -
- besi Beton Kg 2,974.19 - -
- Begesting Pasangan Batako 1:5 m2 15.36 - -
5 Pekerjaan Beton Sloope
- Beton Cor K-225 m3 5.04 - -
- besi Beton Kg 1,126.08 - -
- Begesting 2 X pakai m2 33.60 - -
6 Pekerjaan Beton Kolom
- Beton Cor K-225 m3 8.33 - -
- besi Beton Kg 2,121.56 - -
- Begesting 2 X pakai m2 105.18 - -
7 Pekerjaan Beton Lantai Dan Pondasi Genset
- Beton Cor K-300 m3 16.49 - -
- besi Beton Kg 270.78 - -
8 Pekerjaan Beton Balok Atap
- Beton Cor K-225 m3 11.42 - -
- besi Beton Kg 1,964.15 - -
- Begesting 2 X pakai m2 80.86 - -
9 Pekerjaan Beton Plat Atap
- Beton Cor K-225 m3 15.01 - -
- besi Beton Kg 2,016.08 - -
- Begesting 1 X pakai m2 124.82 - -
10 Pekerjaan Beton Listplank
- Beton Cor K-225 m3 3.10 - -
- besi Beton Kg 698.79 - -
- Begesting 2 X pakai m2 50.09 - -
11 Kolom Praktis dan Balok Latei
- Beton Cor K-225 m3 1.07 - -
- besi Beton Kg 224.43 - -
- Begesting 2 X pakai m2 21.38 - -
12 Pekerjaan Pasangan Dinding Bata 1 Pc : 4 Ps m3 197.50 - -
13 Pekerjaan Plesteran Dinding 1 Pc : 4 Ps m3 298.12 - -
14 Pekerjaan Acian Dinding m3 474.25 - -
15 Pekerjaan Water Proofing ( Atap ) m2 161.84 - -
16 Pekerjaan Beton Sloope, Ring Balk & Kolom Praktis m3 0.90 - -
17 Pekerjaan Pas. Keramik Lantai 30 x 30 m2 21.43 - -
Jumlah -

b Pekerjaan Kusen Pintu dan Jendela


1 Pekerjaan Kusen Pintu dan Jendela Aluminium m 21.16 - -
2 Pekerjaan Daun Jendela Jalusi m2 10.37 Err:509 Err:509
3 Pekerjaan Kusen Pintu Besi Profil C NP 140 x 60 x 7 mm m 29.63 - -
4 Pekerjaan Pintu Plat baja 2 sisi dalamnya Glass wool m2 13.68 - -
5 Pasang Engsel Pintu baja As 1" pasang 18.00 - -
6 Pasang Kunci Pintu Baja pasang 4.00 - -
7 Pasang Grendel Tanam untuk Pintu baja Set 4.00 - -
8 Talang Air Hujan m' 20.80 - -
9 Baut Angkur M22 Penjangkaran 1000 mm bh 10.00 - -
Jumlah Err:509

c Pekerjaan Finishing
1 Pekerjaan Pengecatan Dinding (Plamuur dan Cat Tembok) m2 437.28 - -
2 Pek. Pasangan Bata Paras Sangsit m2 25.90 - -
3 Pekerjaan Pasangan Pepalihan Style Bali (Batu Paras Sangsit) m2 90.12 - -
Jumlah -

- PEKERJAAN BANGUNAN IPAL Err:509


1 Pekerjaan Tanah ###
1 Pengukuran dan Pasang Bowplank m' 83.20 - -
2 Galian Tanah dengan Excavator m3 311.75 - -
3 Urugan Tanah Kembali dengan Pemadatan m3 51.54 - -
4 Urugan Pasir m3 13.85 - -
5 Kerikil Halus gradasi butiran Ø 0.3 - 1.75 Cm m3 22.94 220,327.80 5,055,035.80
6 Pasir Halus gradasi butiran Ø 0.4 - 0.7 mm m3 25.03 193,004.90 4,830,719.64
Jumlah 9,885,755.44

2 PEKERJAAN STRUKTUR ATAU SIPIL DAN ASITEKTUR


a Pekerjaan Beton
1 Lantai Kerja K 125 ( 1 pc : 3 ps : 5 Kr) m3 6.93 - -
2 Beton Plat Lantai
- Beton K 300 m3 46.32 - -
- Pembesian kg 6,092.49 - -
- Begesting 2x Pakai m2 27.49 - -
3 Pekerjaan Beton Dinding dan Saluran ###
- Beton K 300 m3 75.06 - -
- Pembesian kg 10,500.55 - -
- Begesting 2x Pakai m2 500.43 - -
Jumlah -
b PEKERJAAN LAIN LAIN
1 Pekerjaan Baja Profil I WF 250 X 125 X 5 mm Kg 475.92 - -
2 Pekerjaan Baja Profil I NP 60 Kg 177.24 - -
3 Pekerjaan Besi Plat Tebal 5 cm Kg 577.76 - -
4 Pekerjaan Grill Penutup Besi strip 30 x 3 mm m2 9.35 1,087,936.03 10,172,201.83
5 Pekerjaan Pintu Air Unit 2.00 271,984.01 543,968.02
6 Pekerjaan Pintu Air dari kayu ulin / besi lubang 400 x 300 mm unit 2.00 15,334,000.00 30,668,000.00
7 Pekerjaan waterproofing m2 288.66 - -
8 Baut Angkur M22 Penjangkaran 1000 mm bh 16.00 - -
9 Plat Andas 300 x 300 x 18 mm bh 2.00 Err:509 Err:509
10 Meni dan Cat Besi m2 15.78 - -
Jumlah Err:509

- PEKERJAAN BANGUNAN RESERVOIR KAPASITAS 2600 M3 #REF!


1 PEKERJAAN TANAH
1 Pengukuran dan Pasang Bowplank m' 133.40 - -
2 Galian Tanah dengan excavator m3 3,022.19 - -
3 Urugan Tanah Kembali dengan Pemadatan m3 212.70 - -
4 Urugan Pasir t = 10 cm m3 69.48 - -
Jumlah -
2 PEKERJAAN STRUKTUR ATAU SIPIL DAN ASITEKTUR
a Pekerjaan Beton
1 Pekerjaan Pondasi Bor Pile
- Pembuatan lubang Bor Pile Ø 40 cm m 980.00 #REF! #REF!
- Beton Cor K-300 m3 123.09 - -
- besi Beton Kg 20,203.79 - -
2 Lantai Kerja K - 125 (1 PC : 3 PS : 5KR)
- Cor Beton Camp 1:3:5 m3 50.33 - -
3 Pekerjaan Beton pondasi Plat Setempat & Keliling
- Beton Cor K-300 m3 105.41 - -
- besi Beton Kg 39,177.49 - -
- Begesting Pasangan Batako m2 230.24 - -
4 Pekerjaan Sloof
- Beton Cor K-300 m3 46.98 - -
- Pekerjaan Besi Beton Kg 15,145.60 - -
- Begesting Pasangan Batako m2 313.20 - -
5 Pekerjaan Beton Lantai
- Beton Cor K-300 m3 247.14 - -
- besi Beton Kg 41,030.07 - -
6 Pekerjaan Beton Kolom
- Beton Cor K-300 m3 68.85 - -
- besi Beton Kg 15,896.45 - -
- Begesting 2 X pakai m2 635.06 - -
7 Pekerjaan Beton Dinding Basement
- Beton Cor K-300 m3 320.38 - -
- besi Beton Kg 34,908.46 - -
- Begesting 2 X pakai m2 2135.88 - -
- Pekerjaan Tie Rod pada Bekisting Vertikal m1 1669.60 68,500.00 114,367,600.00
8 Pekerjaan Beton Balok
- Beton Cor K-300 m3 68.99 - -
- besi Beton Kg 13,276.15 - -
- Begesting 2 X pakai m2 588.56 - -
9 Pekerjaan Beton Plat Atap
- Beton Cor K-300 m3 95.70 - -
- besi Beton Kg 18,810.82 - -
- Begesting 1 X pakai m2 793.73 - -
10 Pekerjaan Beton Listplang
- Beton Cor K-300 m3 8.44 - -
- besi Beton Kg 1,014.72 - -
- Begesting 2 X pakai m2 185.77 - -
11 Pekerjaan Tangga
- Beton Cor K-300 m3 3.31 - -
- besi Beton Kg 854.28 - -
- Begesting 2 X pakai m2 15.40 - -
12 Pekerjaan Dudukan Pompa dan Pipa
- Beton Cor K-300 m3 0.23 - -
- besi Beton Kg 255.93 - -
- Begesting 2 X pakai m2 6.96 - -
Jumlah #REF!

b Pekerjaan Pasangan dan Pelapis


1 Pekerjaan PasanganPondasi Batu Kali m3 2.20 - -
2 Pekerjaan Pas, Dinding Bata Merah 1 : 2 m2 559.44 - -
3 Pekerjaan Pas, Dinding Bata Merah 1 : 4 m2 55.92 - -
4 Pekerjaan Pas. Batako m2 402.90 - -
5 Pekerjaan Water Proofing m2 3,901.92 - -
6 Pekerjaan Water Stop m 960.05 - -
7 Pekerjaan Plesteran 1 PC : 2 Ps m2 1,118.88 - -
8 Pekerjaan Plesteran 1 PC : 4 Ps m2 142.20 - -
9 Pekerjaan Acian m2 371.10 - -
10 Pek. Pasangan Bata Paras Sangsit m2 32.87 - -
10 Meni dan cat besi m2 11.51 - -
Jumlah -

c Pekerjaan Kusen Pintu dan Relling


1 Pekerjaan Kusen Aluminium m' 27.50 - -
2 Pekerjaan Daun Pintu Panil m2 1.94 - -
3 Pekerjaan Jendela Jelusi m2 1.73 - -
4 Pas. Engsel Pintu bh 2.00 - -
5 Pasang Handle + Kunci Pintu bh 1.00 - -
6 Pekerjaan Kusen Pintu Baja Profil L 70.70.6 m2 11.20 - -
7 Pekerjaan Daun Pintu Besi rangka L 50.50.5 m2 11.51 - -
8 Pasang Engsel Pintu baja As 1" pasang 3.00 235,361.50 706,084.50
9 Pasang Kunci Pintu Baja set 1.00 225,000.00 225,000.00
10 Pasang Grendel Tanam untuk Pintu baja pasang 2.00 138,527.50 277,055.00
11 Pekerjaan Pipa Ventilasi GIP 4" Unit 7.00 750,000.00 5,250,000.00
12 Pekerjaan Penutup Man Hole Plat Besi T= 1.2 mm Unit 7.00 Err:509 Err:509
13 Pekerjaan Tangga Inspeksi Pipa GIP Unit 7.00 Err:509 Err:509
14 Railling Balkon dan Tangga (Pipa Black Steel) m' 31.68 Err:509 Err:509
Jumlah Err:509

- PEKERJAAN BANGUNAN POS JAGA 9,394,638.00


1 Pekerjaan Tanah
1 Pengukuran dan Pasang Bowplank m' 32.40 - -
2 Galian Tanah dengan excavator m3 23.35 - -
3 Urugan Tanah Kembali dengan Pemadatan m3 10.48 - -
4 Urugan Pasir t = 10 cm m3 1.13 - -
5 Pek. Urugan Tanah Peninggian Lantai m3 1.50 - -
6 Pek. Urugan Pasir Lantai Kerja m3 1.07 - -
Jumlah -
2 PEKERJAAN STRUKTUR ATAU SIPIL DAN ASITEKTUR
a Pekerjaan Beton
1 Lantai Kerja K - 125
- Cor Beton K-125 m3 1.07 - -
2 Pekerjaan Sloof
- Beton Cor K-175 m3 1.44 - -
- Pekerjaan Besi Beton Kg 163.30 - -
- Begesting Pasangan Batako m2 14.35 - -
3 Pekerjaan Beton Kolom
- Beton Cor K-175 m3 0.96 - -
- besi Beton Kg 193.49 - -
- Begesting 2 X pakai m2 25.51 - -
4 Pekerjaan Beton Balok
- Beton Cor K-175 m3 1.57 - -
- besi Beton Kg 273.81 - -
- Begesting 2 X pakai m2 29.94 - -
5 Pekerjaan Beton Plat Atap
- Beton Cor K-175 m3 1.79 - -
- besi Beton Kg 419.47 - -
- Begesting 2 X pakai m2 14.88 - -
6 Pekerjaan Beton Lisplank
- Beton Cor K-175 m3 0.61 - -
- besi Beton Kg 249.26 - -
- Begesting 2 X pakai m2 13.76 - -
7 Pekerjaan Meja Beton
- Beton Cor K-175 m3 0.10 - -
- besi Beton Kg 25.69 - -
- Begesting 2 X pakai m2 1.95 - -
Jumlah -

b Pekerjaan Pasangan dan Pelapis


1 Pekerjaan Pasangan Batu Kosong m3 3.40 - -
2 Pekerjaan Pasangan Batu Kali Camp 1 : 5 m3 9.04 - -
3 Pekerjaan Pasangan Bata Camp 1:5 m2 99.88 - -
4 Pekerjaan Trasram m2 13.68 - -
5 Pekerjaan Plesteran 1 PC : 5 PS m2 199.76 - -
6 Pekerjaan Acian m2 199.76 - -
7 Pekerjaan Cat Dinding m2 199.76 - -
8 Pek. Pas. Batu Alam Random m2 13.76 - -
9 Pek. Tempelan Batu Candi m2 30.83 - -
Jumlah -

c Pekerjaan Atap
1 Pekerjaan Rangka Kuda-Kuda Atap m3 0.46 - -
2 Pekerjaan Usuk dan Reng m2 53.04 - -
3 Pekerjaan Pasangan Atap Genteng m2 18.71 - -
4 Pekerjaan Pas Bubungan m' 22.15 - -
5 Pekerjaan Pas. Ikut Celedu unit 4.00 - -
6 Pekerjaan Pas. Murda unit 2.00 - -
7 Pekerjaan Pas. Listplank m' 19.40 - -
8 Pekerjaan Pas. Tatab m' 19.72 - -
9 Pek. Cat Listplank m2 9.70 - -
Jumlah -
d Pekerjaan Langit-Langit
1 Pas. Plafond Kasiboard Rangka Hollow m3 21.37 - -
2 Pas. List Gypsum m' 37.60 - -
3 Pek. Cat Plafond m2 21.37 - -
Jumlah -
e Pekerjaan Penutup Lantai
1 Pas.Keramik 30 x 30 cm m2 20.68 - -
2 Pas. Keramik 20x30 cm m2 2.25 - -
3 Pas. Keramik Dinding m2 12.60 - -
4 Pas. Stepnozing m' 6.00 - -
Jumlah -
f Pekerjaan Kusen Pintu dan Jendela
1 Pas. Kusen Kayu Kamper m3 0.23 - -
2 Pas. Daun Pintu Kayu Kamper m2 5.19 - -
3 Pas. Jendela Kaca m2 1.76 - -
4 Pas. Kaca Bening t = 5 mm m2 0.78 - -
5 Pas. Engsel Pintu set 6.00 - -
6 Pas. Grendel Pintu unit 2.00 - -
7 Pas. Handle & Kunci Pintu m' 2.00 - -
8 Pas. Engsel Jendela unit 8.00 - -
9 Pas. Grendel Jendela unit 4.00 - -
10 Pas. Kait Angin unit 8.00 - -
11 Pek. Polituran m2 28.50 - -
Jumlah -
g Pekerjaan Toilet
1 Instalasi Plumbing Air Bersih m 25.00 42,900.00 1,072,500.00
2 Instalasi Plumbing Air Kotor m 36.00 231,170.50 8,322,138.00
3 Closet duduk bh 1.00 - -
4 Pasang Washtafel set 1.00 - -
5 Pasang Floor Drain set 1.00 - -
6 Pasang Kran air set 2.00 - -
7 Pekerjaan Septiktank unit 1.00 - -
8 Pekerjaan Peresapan unit 1.00 - -
Jumlah 9,394,638.00

571,822,156.82
B BANGUNAN ADAT PURA
1 Pekerjaan Tanah
1 Pengukuran dan Pasang Bowplank m' 63.46 - -
8 Urugan Tanah Biasa dipadatkan m3 384.68 - -
9 Urugan Pasir di bawah Pondasi t = 10 cm m3 4.04 - -
Jumlah 1 -

2 Pekerjaan Padmasana & Pelinggih Lain


1 Pek. Padmasana (Batu Tabas Karangasem) set 1.00 92,950,000.00 92,950,000.00
2 Pek. Pasangan Paving Stone/Block m2 160.24 - -
3 Pekerjaan Tugu Pelinggih Wisnu Ls 1.00 22,000,000.00 22,000,000.00
4 Pekerjaan Tugu Penunggun Karang Ls 1.00 22,000,000.00 22,000,000.00
5 Pekerjaan Penyengker Ls ###
- Pek. Pasangan Batu Kali 1 : 5 m3 29.20 - -
- Pek. Candi Bentar unit 2.00 - -
- Pek. Paduraksa unit 9.00 - -
- Pek. Tembok Penyengker m' 27.76 - -
- Pek. Beton Sloof, Kolom, dan Balok K175 m3 2.05 - -
- Pek. Begesting Sloof 2x Pakai m2 12.76 - -
- Pek. Begesting Kolom 2x Pakai m2 3.69 - -
- Pek. Begesting Balok 2x Pakai m2 17.50 - -
- Pek. Pembesian kg 409.10 - -
- Pek. Pengeresek m3 2.02 - -
- Pek. Pasangan Bata Camp. 1 : 5 m2 24.98 - -
6 Pekerjaan Piyasan Ls 1.00 50,765,000.00 50,765,000.00
7 Pekerjaan Penunggun Karang (Belakang) Unit 1.00 19,250,000.00 19,250,000.00
8 Railling Balkon dan Tangga (Pipa Black Steel) m 23.46 15,552,308.48 364,857,156.82
Jumlah 2 571,822,156.82
###
331,759,430.06
C PEKERJAAN HALAMAN/LANSCAPE
Pekerjaan Halaman/Lanscape
1 Pengukuran dan Pasang Bowplank m' 283.24 - -
2 Galian Tanah dengan excavator m3 36.78 - -
3 Pasangan Paving Block t = 10 cm m2 735.56 - -
4 Pas. Saluran Uditch 50x50 x120 mm m' 350.72 - -
5 Pas Grill Saluran m2 94.78 1,500,000.00 142,176,000.00
6 Pas. Gasebo Unit 1.00 79,750,000.00 79,750,000.00
7 Pas. Kansteen m' 354.42 - -
8 Pek. Beton Rabat m3 15.36 - -
9 Penanaman Pohon Jepun Bali pohon 18.00 1,796,733.92 32,341,210.48
10 Penanaman Pohon Palem Putri pohon 25.00 1,250,000.00 31,250,000.00
11 Penanaman Pohon Lontar pohon 3.00 725,000.00 2,175,000.00
12 Penananaman Pohon Kelapa Gading pohon 5.00 254,203.92 1,271,019.58
13 Penanaman Pucuk Merah pohon 75.00 45,000.00 3,375,000.00
14 Penanaman Pohon Soka Bangkok pohon 465.00 15,500.00 7,207,500.00
15 Penanaman Pohon Bakung Putih pohon 385.00 18,500.00 7,122,500.00
16 Penanaman Pohon Kana pohon 450.00 25,000.00 11,250,000.00
17 Penanaman Rumput m2 346.03 40,000.00 13,841,200.00
Jumlah 331,759,430.06

449,825,659.09
D PEKERJAAN PAGAR
Pekerjaan Pagar
1 Pengukuran dan Pasang Bowplank m' 192.81 - -
2 Galian Tanah dengan excavator m3 44.66 - -
3 Pekerjaan DPT Pasangan Batu Kali 1 PC : 4 PS m3 109.96 - -
4 Pekerjaan Beton Sloope, Ring Balk & Kolom Praktis m3 71.62 - -
5 Pekerjaan Siaran m2 200.53 - -
6 Pekerjaan Pasangan Bata Merah 1 Pc : 5 Ps m2 154.25 - -
7 Pekerjaan Plesteran Tembok 1 PC : 4 PS m2 308.50 - -
8 Pekerjaan Pagar Style Bali M1 192.81 - -
9 Pek. Paduraksa Style Bali bh 65.00 - -
10 Pek. Gapura Style Bali Ls 1.00 356,469,181.89 356,469,181.89
11 Sign Board Style Bali Ls 1.00 93,356,477.20 93,356,477.20
Jumlah 449,825,659.09

E PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 8,752,305.00

- PEKERJAAN MEKANIKAL DAN ELEKTRIKAL BANGUNAN IPA KAPASITAS 165 L/DTK 11,105,288,392.21
a Pengadaan dan Pemasangan mekanikal dan aksesoris
1 Perpipaan Koagulator
- Ø 500 mm x 0,60 m' Flange Spigot Steel unit 3.000 5,373,415.07 16,120,245.22
Ø 500 mm DI Gate Valve resilient seat lengkap dengan
- unit 1.000 70,161,187.89 70,161,187.89
Floor Stand
- Ø 500 mm Steel pipa Prasedimentsi ke Koagulator m' 25.000 3,496,523.07 87,413,076.77
- Ø 500 mm x 90 Steel Bend fl -fl unit 6.000 6,867,525.15 41,205,150.90
- Ø 500 mm x 45 Steel Bend fl -fl unit 2.000 9,405,119.52 18,810,239.04
- Ø 500 mm Bell Mouth unit 1.000 8,162,420.55 8,162,420.55
- Ø 500 mm Flange las unit 10.000 4,662,933.75 46,629,337.50
- Ø 500 mm Flange las unit 6.000 1,453,901.59 8,723,409.57
- Ø 500 mm Karet Packing unit 10.000 94,350.17 943,501.69
- Ø 500 mm Karet Packing unit 6.000 55,889.57 335,337.41
- 1" x 5" Baud Mur set 200.000 43,761.53 8,752,305.00
- Ø 500 mm x 0,60 m' wall pipe unit 5.000 4,674,336.00 23,371,680.00
- unit 2.000 56,944,651.20 113,889,302.40
- Plat Koagulator Uk. 15 m' x 1,5 m' x 12 mm lengkap konst unit 1.000 62,223,948.15 62,223,948.15
2 Perpipaan Flokulasi
Pintu Air Ukuran 400 mm x 468 mm lengkap dengan
- unit 10.000 14,076,000.00 140,760,000.00
Floor Stand
- Ø 200 mm Steel pipa Sch. 40 m' 20.000 2,381,366.31 47,627,326.14
- Ø 100 mm Steel Pipa Sch 40 m' 60.000 1,526,422.64 91,585,358.11
Ø 200 mm DI Batter Fly Valve Resilent seat lengkap
- unit 2.000 8,039,209.32 16,078,418.64
dengan floor Stand drain
- Ø 200 mm x Ø 100 mm Steel Tee Y fl - fl unit 10.000 4,056,787.66 40,567,876.56
- Ø 100 mm DI Butterfly Valve resilien seat fl - fl unit 18.000 3,584,477.55 64,520,595.90
- Ø 200 mm x 90 Bend Steel All flange unit 2.000 9,314,261.98 18,628,523.95
- Ø 200 mm Karet Packing unit 4.000 58,815.17 235,260.68
- Ø 100 mm Karet Packing unit 20.000 58,815.17 1,176,303.38
- Ø 100 mm Karet Packing unit 28.000 14,103.17 394,888.73
- 3/4" x 4" Baud Mur set 256.000 21,321.00 5,458,176.00
- M16 Baud mur set 384.000 38,075.93 14,621,155.20
- M20 Baud mur set 48.000 51,010.67 2,448,511.92
- Ø 100 mm x 90 Bend Steel All flange unit 12.000 262,710.60 3,152,527.20
- Ø 100 mm Wall Pipe unit 12.000 1,241,871.52 14,902,458.26
- Ø 200 mm Flange Las unit 4.000 766,300.20 3,065,200.80
- Ø 100 mm Flange Las unit 48.000 465,922.50 22,364,280.00
3 Perpipaan Sedimentasi ###
- Ø 300 mm Steel pipa Sch. 40 drain m' 38.000 6,845,949.48 260,146,080.36
- Ø 300 mm Tee Y Steel fl - fl drain unit 12.000 5,001,457.41 60,017,488.92
- Ø 300 mm DI Butterfly Valve lengkap dengan Pneumatic unit 6.000 92,251,395.75 553,508,374.50
- Ø 300 mm x 90 Steel Bend fl - fl unit 6.000 2,707,678.85 16,246,073.07
- Ø 300 mm Flange las unit 12.000 4,560,809.20 54,729,710.35
- Ø 300 mm Plat Cap unit 6.000 9,529,113.90 57,174,683.40
- Ø 300 mm Karet Packing unit 12.000 58,815.17 705,782.03
- Ø 300 mm Karet Packing unit 6.000 48,189.17 289,135.01
- Ø 700 mm Steel pipa Sch. 40 m' 42.000 4,724,083.56 198,411,509.65
- Ø 700 mm Flange las unit 4.000 13,403,829.60 53,615,318.40
- Ø 700 mm Flange las unit 12.000 4,415,655.00 52,987,860.00
- Ø 700 mm Blange Flange unit 4.000 11,074,155.00 44,296,620.00
- Ø 700 mm x 0,6 m' Flange las unit 4.000 8,955,245.59 35,820,982.37
- Ø 700 mm Karet Packing unit 8.000 108,564.17 868,513.35
- 1" x 5" Baud Mur set 240.000 43,761.53 10,502,766.00

- Highrate Palte Settler Stainless Steel minimal SUS 304 lbr 1,380.000 425,209.46 586,789,050.80

Pengadaan dan pemasangan 0.30 m' x 0.30 m' x 7.05 m'


- unit 4.000 12,095,700.00 48,382,800.00
SS Gutter
Ø 300 mm DI Butterfly Valve lengkap dengan Pneumatic
- unit 6.000 57,640,605.90 345,843,635.40
(position)
- Ø 400 mm pipa PVC untuk penguras unit 40.000 2,300,278.88 92,011,155.00
- M24 Baud mur set 216.000 56,554.13 12,215,691.00
- M33 Baud mur set 192.000 68,194.43 13,093,329.60
- Ø 300 mm Penguras PVC m' 40.000 1,627,528.88 65,101,155.00
4 Perpipaan Filter ###
- Ø 200 mm Steel pipa Sch. 40 m' 13.500 895,803.34 12,093,345.05
- Ø 300 mm Steel pipa Sch. 40 m' 16.000 2,598,676.66 41,578,826.61
- Ø 200 mm x 90 Bend Steel All flange unit 6.000 1,438,968.96 8,633,813.76
- Ø 200 mm x 90 Bend Steel All flange unit 1.000 1,438,968.96 1,438,968.96
- Ø 200 DI Butterfly Valve fl - fl lengkap Pneumatic unit 6.000 74,271,312.50 445,627,875.00
- Ø 300 DI Butterfly Valve fl - fl lengkap Pneumatic unit 12.000 73,302,550.75 879,630,609.00
- Ø 300 mm x Ø 200 mm Steel Reducer fl -fl unit 6.000 2,718,144.00 16,308,864.00
- Ø 300 mm x Ø 300 mm Steel Tee fl - fl unit 6.000 3,843,840.00 23,063,040.00
- Ø 300 DI Butterfly Valve fl - fl lengkap Pneumatic unit 6.000 110,624,250.00 663,745,500.00
- Ø 300 mm x 0.60 m' Flange Spigot Steel unit 6.000 1,246,080.00 7,476,480.00
- Ø 200 mm Flange las unit 12.000 453,200.00 5,438,400.00
- Ø 200 mm Flange las unit 32.000 453,200.00 14,502,400.00
- Ø 300 mm Flange las unit 18.000 880,000.00 15,840,000.00
- Ø 300 mm Flange las unit 24.000 880,000.00 21,120,000.00
- Ø 200 mm Karet Packing unit 12.000 25,300.00 303,600.00
- Ø 200 mm Karet Packing unit 26.000 25,300.00 657,800.00
- Ø 300 mm Karet Packing unit 18.000 36,850.00 663,300.00
- Ø 300 mm Karet Packing unit 24.000 36,850.00 884,400.00
- Pengadaan dan pemasangan Nosel filter set 3,672.000 143,675.40 527,576,068.80

- Pengadaan dan Pemasangan Gravel Cilica Uk. 5-30 mm m3 32.400 6,930,000.00 224,532,000.00

- Pengadaan dan Pemasangan Silica sand 0.8 - 1.2 mm m3 75.600 13,513,500.00 1,021,620,600.00

- Ø 200 mm x 0,60 m' wall pipe unit 6.000 641,520.00 3,849,120.00


- Ø 300 mm x 0.60 m' Wall Pipe unit 12.000 3,687,800.60 44,253,607.20
- M24 Baud mur set 504.000 44,187.00 22,270,248.00
- M20 Baud mur set 456.000 39,768.30 18,134,344.80
5 Perpipaan Clear Well ( Out ) ###
- Ø 500 mm x 1000 m' Spigot Flange ( Wall pipe ) unit 1.000 10,348,800.00 10,348,800.00
- Ø 500 mm x Ø 300 mm Steel Tee all flange unit 1.000 8,052,000.00 8,052,000.00
- Ø 500 mm Flange las unit 3.000 1,738,000.00 5,214,000.00
Ø 500 mm DI Gate Valve resilient seat lengkap dengan
- unit 1.000 105,494,400.00 105,494,400.00
Floor Stand
- Ø 300 mm CI Bellmouth unit 1.000 2,566,080.00 2,566,080.00
- Ø 300 mm x 750 mm double Flange ( wall pipe ) unit 3.000 2,354,880.00 7,064,640.00
- Ø 300 mm x 90 Steel Bend all flange unit 2.000 1,872,200.00 3,744,400.00
- Ø 500 mm Karet Packing unit 4.000 42,988.00 171,952.00
- Ø 300 mm Karet Packing unit 4.000 36,850.00 147,400.00
- 1" x 5" Baud Mur set 60.000 29,700.00 1,782,000.00
- 3/4" x 4" Baud Mur set 60.000 22,275.00 1,336,500.00
6 Perpipaan Blower ###
- Ø 100 mm Steel Pipa Sch 40 m' 23.000 712,031.56 16,376,725.93
- Ø 100 mm x 90 Steel Bend all flange unit 9.000 505,296.00 4,547,664.00
- Ø 100 mm x Ø 100 mm Steel Tee all flange unit 5.000 1,542,024.00 7,710,120.00
- Ø 100 mm Butterfly fl - fl lengkap Pneumatic unit 6.000 18,506,950.00 111,041,700.00
- Ø 100 mm Flange las unit 20.000 205,920.00 4,118,400.00
- Ø 100 mm Flange las unit 15.000 205,920.00 3,088,800.00
- Ø 300 mm Karet Packing unit 20.000 36,850.00 737,000.00
- 5/8" x 4" Baud Mur set 160.000 11,880.00 1,900,800.00
- Ø 50 mm Steel Pipa Sch 40 m 69.000 375,111.00 25,882,659.00
- Ø 50 mm x 90 Steel Bend all flange unit 18.000 41,250.00 742,500.00
- M16 Baud mur set 280.000 29,458.00 8,248,240.00
7 Blower / Air Compressor pencucian ###
Blower pencucian, Pressure: 35 m', Kap: 4,47 m3/min
- 1030 rpm, 18,5 kW, 3 phase, unit 2.000 93,640,762.50 187,281,525.00
size 125 mm, dilengkapi safety valve
Air Compressor, P = 10kg/cm2, Q = m3/hr, dilengkapi
tangki kapasitas 3000 lt, pressure switch, pressure
- set 2.000 141,635,844.60 283,271,689.20
indikator, safety valve, air dryer, air drain, dan
perpipaan, Motor 18,5kW

Pompa backwash type centrifugal, Q = 50 L/d, Daya


- unit 2.000 92,224,692.75 184,449,385.50
motor, P = 7,5 kW, eff. Min 85%, 4P 50 Hz, 1450 rpm
Perpipaan Tubing Pollyeurthan tube 8mm , Nepple For
- Ls 1.000 107,640,000.00 107,640,000.00
selenoid + Material support
8 Perpipaan Air Wash ###
- Ø 150 mm Steel Pipa Sch. 40 m' 30.000 2,935,428.03 88,062,840.82
- Ø 150 mm x 90 Steel Bend all flange unit 9.000 4,087,294.35 36,785,649.15
- Ø 150 mm x Ø 100 mm Steel Tee all flange unit 5.000 1,651,488.55 8,257,442.75
- Ø 150 mm Butterfly fl - fl lengkap Pneumatic unit 6.000 49,977,193.35 299,863,160.10
- Ø 150 mm Flange las unit 20.000 2,800,927.35 56,018,547.00
- Ø 150 mm Karet Packing unit 20.000 58,815.17 1,176,303.38
- 5/8" x 4" Baud Mur set 160.000 123,440.10 19,750,416.48
- Ø 200 mm Steel Pipa Sch. 40 unit 8.000 1,181,169.09 9,449,352.70
- Ø 300 mm Steel Pipa Sch. 40 unit 13.000 3,508,958.20 45,616,456.54
- Ø 200 mm Butterfly fl - fl lengkap Pneumatic unit 6.000 17,511,399.60 105,068,397.60
- Ø 300 mm Blange Flange unit 1.000 2,025,874.50 2,025,874.50
- Ø 300 mm x Ø 200 mm Steel Tee all flange unit 6.000 3,519,945.30 21,119,671.80
- Ø 200 mm x 90 Steel Bend fl-fl unit 8.000 1,968,126.47 15,745,011.74
- Reducer Ø 300 mm - Ø 200 mm unit 1.000 3,658,835.40 3,658,835.40
- Ø 300 mm Flange las unit 1.000 1,352,800.20 1,352,800.20
- Ø 200 mm Karet Packing unit 35.000 33,699.17 1,179,470.91
- Ø 300 mm Karet Packing unit 1.000 48,189.17 48,189.17
- M24 Baud mur set 24.000 56,554.13 1,357,299.00
- M20 Baud Mur set 420.000 51,010.67 21,424,479.30
Jumlah 9,409,248,508.09

Pengadaan dan Pemasangan elektrikal dan aksesoris ###


1 Panel Utama Filter dan Kontrol pencucian (M-FL)
- Box Panel unit 1.000 4,974,900.00 4,974,900.00
- Bus Bar 3P+N/1205A +PE dan acessories set 1.000 35,535,000.00 35,535,000.00
MCCB 3P(252-630)A 50KA + Micrologic 2,0 manually
- set 1.000 8,026,150.00 8,026,150.00
operated
- MCCB 3P(100-125)A 36KA + electronic trip set 1.000 3,647,500.00 3,647,500.00
- MCCB 3P(80-100)A 25KA + electronic trip set 1.000 89,524,036.20 89,524,036.20
- MCB 3P/16A, 10A unit 1.000 710,700.00 710,700.00
- MCB 3P/25A 10A unit 3.000 710,700.00 2,132,100.00
- MCB 2P/20A 10A unit 1.000 710,700.00 710,700.00
DOL Starting Motor 0.55kW, 3 komponen, type high
- set 60.000 1,978,588.80 118,715,328.00
performance
- Contactor 3P, 9A, AC3, 380 V unit 60.000 2,842,800.00 170,568,000.00
- Voltmeter (0-500)V, Uk 72x72 unit 1.000 1,208,190.00 1,208,190.00
- VS (Voltage Selector switch, 7 posisi) unit 1.000 2,132,100.00 2,132,100.00
- MCB 1P/4A 6A unit 24.000 2,132,100.00 51,170,400.00
- Sequence control relay (auxiliary relay) dan kelengkapann LS 1.000 2,422,981.00 2,422,981.00
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.000 57,500.00 57,500.00
2 Panel Meja Kontrol Filter (MCD-FL)
- Box Panel unit 1.000 4,974,900.00 4,974,900.00
- MCB 1P/4A 6A unit 12.000 2,132,100.00 25,585,200.00
Plug relay 220V, 14 pin, 4 kontak C/O, 5 amp, built in
- unit 60.000 790,298.40 47,417,904.00
pilot light komplit dengan dudukan
- Pilot lamp, Ø 22 mm plastic 220-240 VAC unit 12.000 214,631.40 2,575,576.80
- Push button Ø 22 mm flush, plastic (reset) unit 2.000 1,193,976.00 2,387,952.00
- Push button Ø 22 mm, plastic 220-240 VAC unit 120.000 1,193,976.00 143,277,120.00
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.000 57,500.00 57,500.00
Local Control panel sludge drain valve (LCP-SD 1/2,…LCP-SD-
3
SD10)
Local control panel, type metal (zinc alloy), IP 65, 4
- LS 6.000 35,535,000.00 213,210,000.00
lubang komlit pust button start-stop, ukuran 80 x 130mm
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.000 57,500.00 57,500.00
4 Panel Kontrol Blower Pencucian (PC-BWR)
- Box Panel unit 1.000 4,974,900.00 4,974,900.00
- Bus Bar 3P+N/205A +PE dan acessories set 1.000 81,564,196.20 81,564,196.20
- MCCB 3P(100-125)A 36KA + electronic trip set 1.000 2,842,800.00 2,842,800.00
- MCB 3P/25A 10A unit 2.000 710,700.00 1,421,400.00
- MCB 2P/16A 10A unit 1.000 710,700.00 710,700.00
- MCB 4P/20A 10A unit 1.000 710,700.00 710,700.00
DOL Starting Motor 0.55kW, 3 komponen, type high
- set 60.000 1,978,588.80 118,715,328.00
performance
- Contactor 3P, 9A, AC3, 380 V unit 60.000 2,842,800.00 170,568,000.00
- Voltmeter (0-500)V, Uk 72x72 unit 1.000 1,208,190.00 1,208,190.00
- VS (Voltage Selector switch, 7 posisi) unit 1.000 2,132,100.00 2,132,100.00
- MCB 1P/4A 6A unit 1.000 2,132,100.00 2,132,100.00
Relay arus bocor (Modul Vigi) 4P, 40A, Sensitifitas =
- unit 1.000 2,103,672.00 2,103,672.00
300 mA
- Voltmeter (0-500)V, Uk 72x72 unit 1.000 1,208,190.00 1,208,190.00
- VS (Voltage Selector switch, 7 posisi) unit 1.000 2,132,100.00 2,132,100.00
- Amperemeter 3P/0-50A unit 4.000 639,630.00 2,558,520.00
- CT 50/5 unit 4.000 639,630.00 2,558,520.00
Star delta Starting Motor 18,5 kW, 3 komponen, type
- set 4.000 42,642,000.00 170,568,000.00
high performance
- (Kordinasi Type 2), terdiri dari :
Fuse carrier (STI), 2P(1P+N), lengkap denan tabung sedring (fuse catrige), type aM,
- set 4.000 355,350.00 1,421,400.00
Ukuran 10,3x38mm, 2A, 500V, 80kA
- Buzzer, 70 dBA unit 1.000 335,450.40 335,450.40
- Hour counter 220V unit 4.000 568,560.00 2,274,240.00
RCP (Relay Control Phase) untuk unbalanced/missing
- phase 2 kontak output C/O, Delay unit 4.000 2,132,100.00 8,528,400.00
(0.1-10) detik, (380-500)V
Plug in relay 220V, 14 pin, 4 kontak C/O, 5 amp, built
- unit 8.000 790,298.40 6,322,387.20
in pilot light, komplit dengan dudukan
- Pilot lamp, Ø 22 mm plastic 220-240 VAC unit 7.000 214,631.40 1,502,419.80
- Push button Ø 22 mm flush, plastic (reset) unit 2.000 1,193,976.00 2,387,952.00
- Push button Ø 22 mm, plastic 220-240 VAC unit 8.000 1,193,976.00 9,551,808.00
Plug dan Socket 2P+E, 16A, 220 VAC, Panel mounted
- set 1.000 2,842,800.00 2,842,800.00
komplit
Plug dan Socket 3P+N+E, 16A, 380 VAC, Panel
- set 1.000 2,842,800.00 2,842,800.00
mounted komplit
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.000 57,500.00 57,500.00
5 Panel Ruang Pompa Air Cuci Filter (PP-BW)
Box Plastic mini pragma pintu tranparant, inbow, 24
- unit 1.000 8,826,894.00 8,826,894.00
modul
- MCB 3P/16A 10 KA unit 1.000 710,700.00 710,700.00
- RCCB/ELCB, 4P, 25A, Sensitifitas : 30 mA unit 1.000 1,641,717.00 1,641,717.00
- MCB 1P/6A 6 KA unit 3.000 213,210.00 639,630.00
- MCB 1P/10A 6 KA unit 4.000 213,210.00 852,840.00
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.000 57,500.00 57,500.00
6 Panel Ruang Blower (PP-BWR)
Box Plastic mini pragma pintu tranparant, inbow, 24
- unit 1.000 8,826,894.00 8,826,894.00
modul
- MCB 3P/16A 10 KA unit 1.000 710,700.00 710,700.00
- RCCB/ELCB, 4P, 25A, Sensitifitas : 30 mA unit 1.000 1,641,717.00 1,641,717.00
- MCB 1P/6A 6 KA unit 3.000 213,210.00 639,630.00
- MCB 1P/10A 6 KA unit 4.000 213,210.00 852,840.00
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.000 57,500.00 57,500.00
7 Panel Lampu Luar Filter (PP-LR 2)
- Box Panel outdoor type unit 1.000 2,842,800.00 2,842,800.00
- MCB 3P/32A 6 KA unit 1.000 710,700.00 710,700.00
- Contactor, 3P, 32 A AC1, 380 V unit 2.000 2,132,100.00 4,264,200.00
- Photo cell unit 1.000 710,700.00 710,700.00
- MCB 3P/16A 6 KA unit 3.000 710,700.00 2,132,100.00
- Push button dia. 22 mm, plastic 220-240 VAC unit 4.000 1,193,976.00 4,775,904.00
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.000 57,500.00 57,500.00
8 Penerangan Ruang Filter
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 10.000 725,411.49 7,254,114.90
- Lampu Phillips 2 x 36W/220V, WP (water proof) unit 12.000 607,200.00 7,286,400.00
- Single switch 10 A/ 220V plano unit 8.000 24,730.75 197,846.00
- Double Switch 10 A/ 220V plano unit 5.000 24,730.75 123,653.75
- Outlet 10A/2P+E, 220V, WP (water proof) unit 4.000 226,068.15 904,272.60
- Kabel NYM 3 x 2,5 mm2 m 250.000 16,903.50 4,225,875.50
- uPVC Conduit 20 mm m 220.000 12,792.60 2,814,372.00
- uPVC Conduit 25 mm m 2.000 14,214.00 28,428.00
Exhaust fan, Industrial type, wall mounted, 16", komplit
- set 4.000 670,450.00 2,681,800.00
base frame
9 Penerangan Ruang Blower Pencucian
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 8.000 725,411.49 5,803,291.92
- Single switch 10 A/ 220V plano unit 4.000 24,730.75 98,923.00
- Double Switch 10 A/ 220V plano unit 2.000 24,730.75 49,461.50
- Outlet 10A/2P+E, 220V, WP (water proof) unit 1.000 226,068.15 226,068.15
- Kabel NYM 3 x 2,5 mm2 m 50.000 16,903.50 845,175.10
- uPVC Conduit 20 mm m 45.000 12,792.60 575,667.00
- uPVC Conduit 25 mm m 2.000 14,214.00 28,428.00
Exhaust fan, Industrial type, wall mounted, 16", komplit
- set 1.000 670,450.00 670,450.00
base frame

10 Penangkal Petir Bangunan IPA - Filter

- Penangkal Petir type Elctrode dengan Rmin = 60m LS 1.000 10,822,650.43 10,822,650.43

- BC 50 mm2 m 70.000 54,450.00 3,811,500.00


- Clamp BC, 50 mm2 unit 390.000 40,383.02 15,749,379.36
- Air terminal Ø 1, termasuk dudukan, komplit set 4.000 686,511.41 2,746,045.63
- GIP Ø 2 termasuk socket set 4.000 662,281.60 2,649,126.39
- Grounding rod 3/4 set 4.000 282,681.17 1,130,724.67
- Pipa PVC Ø 1, termasuk clamp set 8.000 290,757.78 2,326,062.20
- Box control 30x30x70 cm LS 2.000 848,043.50 1,696,087.01

11 Instalasi Penerangan
- Lampu Mercury 250 watt Sorot unit 2.000 313,958.05 627,916.10
- Lampu Mercury 250 watt Sorot unit 2.000 313,958.05 627,916.10
- Kabel dari P. Penerangan R. Kimia ke Disconecting Switch
- - NYFGBY 4 x 2,5 mm2 meter 75.000 152,924.00 11,469,300.00
- Kabel dari DS ke lampu2 -
- - NYY 3 x 2,5 mm2 meter 40.000 106,556.00 4,262,240.00
- Pipa PVC 20mm meter 40.000 22,024.80 880,992.00
- Disconecting switch Outdoor Type unit 1.000 1,545,600.00 1,545,600.00
12 Panel Lokal Valve Sedimentasi
Panel Lokal Filter Outdoor type double door dengan
- unit 2.000 6,762,000.00 13,524,000.00
support
- Selenoid valve + manifold 6 selenoid (by others)
Plug in relay 220V, 14 pin, 4 kontak C/O, 5 amp, built
- unit 6.000 58,650.00 351,900.00
in pilot light, komplit dengan dudukan
- Illuminated Push Button Green, 220VAC unit 6.000 596,988.00 3,581,928.00
- Illuminated Push Button Red, 220VAC unit 6.000 596,988.00 3,581,928.00
- Selector Switch 3 Posisi unit 6.000 429,097.20 2,574,583.20
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.000 57,500.00 57,500.00
Jumlah 1,696,039,884.12

- PEKERJAAN MEKANIKAL DAN ELEKTRIKAL BANGUNAN KIMIA DAN CHLORINE 5,471,535,258.72


a Pengadaan dan Pemasangan Mekanikal dan Aksesoris ###
1 Crane untuk Ruang Kimia -
Electric Motor Hoist crane, Kapasitas 1 ton, lengkap
- dengan span, flat bar, conductor dan pendant push button set 1.00 141,361,072.80 141,361,072.80
( R.Kimia )

Electric Motor Hoist crane, Kapasitas 2 ton, lengkap


- dengan span, flat bar, conductor dan pendant push button set 1.00 183,912,103.20 183,912,103.20
( R. Chlor )
2 Pompa Dosing dan pengaduk - -
Mixer 580 rpm, Drive: 4kW, 380V, dilengkapi dengan
- gear, reducer, stainless steel shaft set 4.00 74,120,324.40 296,481,297.60
support, control dan drain oil.
Pompa dozing alum Q = 250 l/jam; P=6,9 bar, Motor =
- unit 3.00 68,366,497.20 205,099,491.60
1,1kW, 380V, 3 phase
Pompa dosing soda ash Q = 450l/jam; P = 6,9 bar, Motor
- unit 3.00 225,411,297.60 676,233,892.80
= 0,55kW, 380V, 3 phase
- IWF Baja 150 x 300 mm Kg 910.16 - -
Jumlah 1,503,087,858.00
b Pengadaan dan Pemasangan Elektrikal dan aksesoris
1 Panel utama / control Pompa Dosing Kimia (M-PK)
- Box Panel Pompa Air Bersih unit 1.00 14,214,000.00 14,214,000.00
- Bus Bar 3P+N/125A +PE dan acessories set 1.00 35,535,000.00 35,535,000.00
- MCCB 3P(100-125)A 36KA + electronic trip set 1.00 3,647,500.00 3,647,500.00
MCCB 3P(252-630)A 50KA + Micrologic 2,0 manually
- set 1.00 8,026,150.00 8,026,150.00
operated
- MCB 2P/25 A, 10 KA unit 2.00 710,700.00 1,421,400.00
- MCB 2P/16 A, 10 KA unit 1.00 710,700.00 710,700.00
- MCB 4P/20 A, 10 KA unit 1.00 710,700.00 710,700.00
Relay arus bocor (Modul Vigi) 4P, 40A, Sensitivitas =
- unit 1.00 2,103,672.00 2,103,672.00
300 mA
- MCB 3P/20 A, 10 KA unit 1.00 710,700.00 710,700.00
- MCB 3P/25 A, 10 KA unit 1.00 710,700.00 710,700.00
- Isolating switch, 380 V, 3P, 40A unit 2.00 1,641,717.00 3,283,434.00
- Voltmeter (0-500)V, Uk 72x72 unit 1.00 1,208,190.00 1,208,190.00
- VS (Voltage Selector switch, 7 posisi) unit 1.00 2,132,100.00 2,132,100.00
DOL Starting Motor 0.55kW, 3 komponen, type high
- set 4.00 1,978,588.80 7,914,355.20
performance
DOL Starting Motor 1.1 kW, 3 komponen, type high
- set 4.00 1,978,588.80 7,914,355.20
performance
DOL Starting Motor 4 kW, 3 komponen, type high
- set 4.00 2,137,785.60 8,551,142.40
performance
Fuse carrier (STI), 2P (1P + N), lengkap dengan tabung
- sekring (fuse catrige), type aM, Ukuran 10,3x38mm, 2A, set 12.00 355,350.00 4,264,200.00
500V, 80kA
- Buzzer, 70 dBA unit 1.00 335,450.40 335,450.40
RCP (Relay Control Phase) untuk unbalanced/missing
- phase 2 kontak output C/O, Delay (0.1-10) detik, (380- unit 2.00 2,132,100.00 4,264,200.00
500)V
Plug in relay 220V, 14 pin, 4 kontak C/O, 5 amp, built
- unit 24.00 790,298.40 18,967,161.60
in pilot light, komplit dengan dudukan
- Water Level Control (WLC), Time delay (0.1-10)detik, sen unit 4.00 2,132,100.00 8,528,400.00
- Pilot lamp, Ø 22 mm plastic 220-240 VAC unit 36.00 214,631.40 7,726,730.40
- Push button Ø 22 mm flush, plastic (reset) unit 2.00 - -
Plug dan Socket 2P + E 16A, 220 VAC, Panel mounted,
- set 1.00 2,842,800.00 2,842,800.00
komplit
Plug dan Socket 3P + N + E 16A, 380 VAC, Panel
- set 1.00 2,842,800.00 2,842,800.00
mounted, komplit

- Box Plate metal, 2100x800x600 mm, Floor Standing Unit 1.00 2,842,800.00 2,842,800.00

- MCCB 3 POLE, 250 A Unit 1.00 13,644,750.00 13,644,750.00


- MCCB 3 POLE, 80 A Unit 1.00 2,764,692.00 2,764,692.00
- MCB 3 POLE, 6 A Unit 8.00 1,650,700.80 13,205,606.40
- MCB 3 POLE, 10 A Unit 4.00 1,650,700.80 6,602,803.20
- MCB 2 POLE, 6 A Unit 2.00 1,232,036.40 2,464,072.80
- MCB 1P/6A 6 KA Unit 3.00 50,701.20 152,103.60
- Indicator Lamp R, S, T Unit 3.00 79,212.00 237,636.00
Fuse carrier (STI), 2P (1P + N), lengkap dengan tabung
- sekring (fuse catrige), type aM, Ukuran 10,3x38mm, 2A, Unit 3.00 355,350.00 1,066,050.00
500V, 80kA

- Current Transformator 250/5 A Unit 3.00 1,045,405.20 3,136,215.60


- Contacor LC1D09 Unit 12.00 403,788.00 4,845,456.00
- Thermal Overload LRD06 Unit 4.00 1,223,535.60 4,894,142.40
- VSD 380/3P Unit 8.00 16,422,000.00 131,376,000.00
- Power Supply DC 220VAC / 24VDC 10A Unit 1.00 7,543,494.00 7,543,494.00
- Illuminated Push Button Red, 220VAC Unit 14.00 596,988.00 8,357,832.00
- Illuminated Push Button Green, 220VAC Unit 14.00 596,988.00 8,357,832.00
- Indicator Lamp Yellow, 220VAC Unit 14.00 79,212.00 1,108,968.00
- Push Button Unit 1.00 79,212.00 79,212.00
- Buzzer, 70 dBA Unit 1.00 25,530.00 25,530.00
- Emergency Stop Unit 1.00 497,103.60 497,103.60
Plug in relay 220V, 14 pin, 4 kontak C/O, 5 amp, built
- Unit 24.00 58,650.00 1,407,600.00
in pilot light, komplit dengan dudukan
- Exhaust Fan 6" Unit 2.00 3,619,795.20 7,239,590.40
- Dust Filter Unit 4.00 796,563.60 3,186,254.40
- Perakitan dan Pemasangan lengkap termasuk aksesoris Unit 1.00 57,500.00 57,500.00

2 Panel Penerangan Ruang Kimia (PP-RK) ###


Box Plastic mini pragma pintu tranparant, inbow, 24
- unit 1.00 8,826,894.00 8,826,894.00
modul
- MCB 3P/16A 10 KA unit 1.00 710,700.00 710,700.00
- RCCB/ELCB, 4P, 25A, Sensitifitas : 30 mA unit 1.00 1,641,717.00 1,641,717.00
- MCB 1P/6A 6 KA unit 3.00 213,210.00 639,630.00
- MCB 1P/10A 6 KA unit 1.00 213,210.00 213,210.00

- Box Plate metal, 600x500x200 mm, Wall Mounting unit 1.00 5,796,000.00 5,796,000.00
- Box Plate metal, 600x500x200 mm, Wall Mounting unit 1.00 5,796,000.00 5,796,000.00

- MCB 3P/6A, 6 KA unit 1.00 1,650,700.80 1,650,700.80


- RCCB/ELCB, 4P, 10A, Sensitifitas : 30 mA unit 1.00 1,166,928.00 1,166,928.00
- MCB 1P/4A 6 KA unit 5.00 202,860.00 1,014,300.00
- MCB 1P/6A 6 KA unit 1.00 50,701.20 50,701.20
- MCB 3P/4A 6 KA unit 1.00 1,941,660.00 1,941,660.00
- Time Switch 24 Jam unit 1.00 1,655,337.60 1,655,337.60
- Magnetic Contactor 10A unit 1.00 1,746,141.60 1,746,141.60
- Indicator Lamp R, S, T unit 3.00 79,212.00 237,636.00
- Mini Fuse 2A unit 4.00 176,584.80 706,339.20
- Selector Switch 3 Posisi unit 1.00 429,097.20 429,097.20
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 57,500.00 57,500.00

3 Penerangan Ruang Kimia


- Lampu philips 2 x 18W/220V, WP (Water proof) unit 15.00 725,411.49 10,881,172.35
- Single switch 10 A/ 220V plano unit 6.00 60,150.75 360,904.50
- Double Switch 10 A/ 220V plano unit 3.00 60,150.75 180,452.25
- Outlet 10A/2P+E, 220V, WP (water proof) unit 3.00 243,778.15 731,334.45
- Kabel NYM 3 x 2,5 mm2 m 100.00 16,903.50 1,690,350.20
- uPVC Conduit 20 mm m 75.00 12,792.60 959,445.00
- uPVC Conduit 25 mm m 2.00 14,214.00 28,428.00
- Lampu TL WP 2 X 18 watt Unit 12.00 490,820.00 5,889,840.00
- Lampu TL WP 2 X 36 watt Unit 14.00 642,620.00 8,996,680.00
- Lampu DL 1 X 20watt Unit 1.00 117,530.00 117,530.00
- Outlet 10 A/2P+E 220V Unit 1.00 243,778.15 243,778.15
- Stop kontak AC Unit 1.00 68,626.25 68,626.25
- Double Switch 10 A/ 220V plano Unit 4.00 48,727.00 194,908.00
- Single switch 10 A/ 220V plano Unit 2.00 42,379.00 84,758.00
- Instalasi titik lampu Titik 27.00 422,004.00 11,394,108.00
- Instalasi stop kontak Titik 2.00 397,210.00 794,420.00
- Kabel dari Panel Penerangan R. Kimia ke P. Kimia
- - NYY 4 x 2,5 mm2 meter 10.00 65,688.00 656,880.00
- - BC 4 mm2 meter 10.00 39,412.80 394,128.00
4 Penangkal Petir Bangunan Kimia
- Penangkal Petir type Elctrode dengan Rmin = 60m LS 1.00 10,822,650.43 10,822,650.43
- BC 50 mm2 m 82.00 54,450.00 4,464,900.00
- Clamp BC, 50 mm2 unit 425.00 40,383.02 17,162,785.20
- Air terminal Ø 1, termasuk dudukan, komplit set 12.00 686,511.41 8,238,136.90
- GIP Ø 2 termasuk socket set 4.00 662,281.60 2,649,126.39
- Grounding rod 3/4 set 4.00 282,681.17 1,130,724.67
- Grounding rod 3/4 set 1.00 282,681.17 282,681.17
- Pipa PVC Ø 1, termasuk clamp set 4.00 290,757.78 1,163,031.10
- Box control 30x30x70 cm LS 1.00 848,043.50 848,043.50
- - NYA 50 mm2 meter 30.00 150,150.00 4,504,500.00
- GIP Ø 3 termasuk socket meter 1.00 770,000.00 770,000.00
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 57,500.00 57,500.00
5 Peralatan elektroklorinasi
Onsite Chlorine Disinfectant Generator kap. 4 kg.Cl/jam,
- termasuk sel elektroda, power module, dan terminal Unit 1.00 2,435,400,000.00 2,435,400,000.00
control

- Inline water filter kap. 4 m3/jam, tekanan kerja 3-6 bar Unit 1.00 106,605,000.00 106,605,000.00

- Water softener dg hardness monitoring system Unit 1.00 71,070,000.00 71,070,000.00


- Water chiller system, termasuk power control Unit 1.00 105,600,000.00 105,600,000.00
Submersible pump kap. 2500 L/jam, tekanan 5 bar,
- Unit 1.00 106,605,000.00 106,605,000.00
termasuk power control

HDPE Brine tank kap. 4 m3, termasuk drain, corong inlet


- garam, soft water inlet with automated magnetic valve, Unit 1.00 106,605,000.00 106,605,000.00
brine outlet, overflow

HDPE brine tnak kap. 0,5 m3, termasuk inlet, outlet,


- Unit 1.00 71,070,000.00 71,070,000.00
drain, dan overflow

Brine dosing pump, kap. Min. 100 L/jam, tekanan 5 bar,


- termasuk control panel, push button, indicator light, Unit 2.00 52,800,000.00 105,600,000.00
integrated control ready

HDPE Production tank 30 m3, dilengkapi dengan water


- Unit 1.00 106,605,000.00 106,605,000.00
level sensor
- Power stabiliser kap. 30 kVA Unit 1.00 42,642,000.00 42,642,000.00
6 Peralatan elektroklorinasi
- Pemasangan perpipaan sistem elektroklorinasi LS 1.00 11,220,000.00 11,220,000.00
- Pemasangan pengkabelan sistem elektroklorinasi LS 1.00 22,000,000.00 22,000,000.00
- Pemasangan sistem pembubuhan larutan klorin LS 1.00 105,600,000.00 105,600,000.00
Pemrograman sistem kendali setempat dan kendali jarak
- LS 1.00 49,280,000.00 49,280,000.00
jauh, berikut piranti lunak
Pengujian komisioning dan pelatihan minimal 5 hari,
- LS 1.00 24,640,000.00 24,640,000.00
termasuk dokumentasi dan manual operasi pemeliharaan

Jumlah 3,968,447,400.72

- PEKERJAAN MEKANIKAL DAN ELEKTRIKAL BANGUNAN GENSET 3,689,049,786.74


a Pengadaan dan Pemasangan Mekanikal dan Accessories ###

Generator set, Kapasitas: 500 kW, 380/220V, komplit tangki harian


1 dengan perpipaan, kontrol panel PCC, karet peredam getaran, set 1 1,087,468,750.00 1,087,468,750.00
peredam suara dan kelengkapan lainnya (Lihat spesifikasi khusus)

Fuel Storage tank procurement cap. of 5.000 lt termasuk Suporting


2 material, termasuk perpipaan, strainer, level switch pada control unit 1 106,343,582.00 106,343,582.00
panel bahan bakar, pompa tangan, electric pump dll.
Pengadaan dan pemasangan Rock Wool, tebal 5cm (2") pada
dinding dalam Ruangan, Kawat anyaman galvanized untuk
3 pelindung bahan Glass wool dan kain pembungkus tahan api m2 135.55 2,463,875.00 333,978,256.25
Generator set, lengkap dengan pelidung kain Catton tebal dan kawat
Ram.
Jumlah 1,527,790,588.25
c Pengadaan Elektrikal dan Accessories
1 Trafo dan panel TM ###
- Trafo 800 kVA, 20kV/380-220V, Dyn 5, dan kelengkapann set 1.00 220,788,730.00 220,788,730.00
Panel Tegangan Menengah (cubicle) 24 kV, incoming
- set
dan outgoing with circuit breaker 1.00 626,067,360.00 626,067,360.00
2 Panel Automatic Main Failure (AMF) dan Change Over Switch (COS)
Panel Automatic Main Failure untuk Genset Cap 500
- 1.00 444,213,264.00
KvA, dengan PCC set 444,213,264.00
Change Over Switch untuk kapasitas daya 1500 KvA,
- 1.00
plus interlock system set 6,970,109.94 6,970,109.94
- Box Panel, ukuran T:1800 X L:800 X D:600, free standing set 1.00 3,850,000.00 3,850,000.00
3 Panel Induk Utama, LVM-DP
- Box Plate metal, 2000x(800+800+800)x1000 mm, Floor St unit 1.00 20,527,500.00 20,527,500.00
- Bus Bar 3P+N/2000A + PE dan accessories set 1.00 8,024,914.53 8,024,914.53
ACB 4P/(640-2000)A 50KA (Min) dilengkapi dengan
- unit trip Motor mechanism module 220/240V AC dan set 1.00 149,206,727.00 149,206,727.00
kontak-kontak bantu (Lihat spek khusus)
- MCCB 4P(25-40)A 25KA + electronic trip ke Kantor penge set 1.00 2,842,800.00 2,842,800.00
- MCCB 3P(13-16)A 25KA + electronic trip ke PP. R Gense set 1.00 2,842,800.00 2,842,800.00
- Pilot lamp, Ø 22mm, plastic 220-240 VAC set 8.00 214,631.40 1,717,051.20
- Push button modular plastic 220-240 VAC set 4.00 1,492,470.00 5,969,880.00
Accessories penunjang termasuk relay bantu, isolator
- kabel-kabel, terminal, fuse, ls 1.00 13,325,625.00 13,325,625.00
supporting fanel dll sebagai pelengkap system
- Kapasitor bank, komplit lamp, push button (500 kvar) ( set 1.00 287,767,639.50 287,767,639.50
- MCCB 3 POLE, 1000 A Unit 1.00 53,130,000.00 53,130,000.00
- MCCB 3 POLE, 160 A Unit 1.00 12,507,687.50 12,507,687.50
- MCB 1P/6A 6 KA Unit 6.00 46,476.10 278,856.60
- Mini Fuse Unit 6.00 161,869.40 971,216.40
Plug in relay 220V, 14 pin, 4 kontak C/O, 5 amp, built
- Unit 10.00 53,762.50 537,625.00
in pilot light, komplit dengan dudukan
- Indikator Lamp, Pilot Lamp Ø22mm, 220V Unit 8.00 88,550.00 708,400.00
- Illuminated Push Button, 220VAC Unit 4.00 547,239.00 2,188,956.00
- Power Meter Digital Unit 1.00 2,125,200.00 2,125,200.00
- Current Transformator 2000/5A Unit 6.00 5,041,505.70 30,249,034.20
- Selector Switch 3 Posisi Unit 2.00 393,339.10 786,678.20
- Box Plate metal, 500 x 400 200 mm, Wall Mounting Unit 1.00 4,046,380.80 4,046,380.80
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 57,500.00 57,500.00
4 Panel Penerangan Ruang Listrik Utama (PP-RL)
- Box Plastic mini pragma pintu tranparant, inbow, 24 modul unit 1.00 342,562.00 342,562.00
- MCB 3P/16A 10 KA unit 1.00 218,648.93 218,648.93
- RCCB/ELCB, 4P, 25A, Sensitifitas : 30 mA unit 1.00 653,834.23 653,834.23
- MCB 1P/6A 6 KA unit 3.00 46,476.10 139,428.30
- MCB 1P/10A 6 KA unit 4.00 46,476.10 185,904.40
- Box Plate metal, 600x500x200 mm, Wall Mounting unit 1.00 5,313,000.00 5,313,000.00
- MCB 3P/6A, 6 KA unit 1.00 1,513,142.40 1,513,142.40
- RCCB/ELCB, 4P, 10A, Sensitifitas : 30 mA unit 1.00 1,069,684.00 1,069,684.00
- MCB 1P/4A 6 KA unit 15.00 185,955.00 2,789,325.00
- Time Switch 24 Jam unit 1.00 1,517,392.80 1,517,392.80
- Magnetic Contactor 10A unit 1.00 1,600,629.80 1,600,629.80
- Indikator Lamp, Pilot Lamp Ø22mm, 220V unit 3.00 57,500.00 172,500.00
- Mini Fuse 2A unit 3.00 161,869.40 485,608.20
- Selector Switch 3 Posisi unit 1.00 393,339.10 393,339.10
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 57,500.00 57,500.00
5 Penerangan Ruang listrik utama
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 8.00 455,400.00 3,643,200.00
- Lampu philips 36W/220V, Industrial Type unit 1.00 607,200.00 607,200.00
- Lampu philips 2 x 36W/220V, Water proof unit 4.00 607,200.00 2,428,800.00
- Single switch 10 A/ 220V plano unit 6.00 24,730.75 148,384.50
- Double Switch 10 A/ 220V plano unit 2.00 30,549.75 61,099.50
- Outlet 10A / 220 V unit 2.00 92,073.30 184,146.60
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 2.00 226,068.15 452,136.30
- Kabel NYM 3 x 2,5 mm2 m 160.00 16,903.50 2,704,560.32
- uPVC Conduit 20 m m 140.00 12,792.60 1,790,964.00
- uPVC Conduit 25 m m 2.00 14,214.00 28,428.00
- Exhaust fan, Industrial type, wall mounted, 16", komplit ba set 2.00 670,450.00 1,340,900.00
- Lampu TL / DL 2 X 18 watt unit 21.00 130,410.00 2,738,610.00
- Lampu PJU, 56 watt + timer unit 30.00 130,410.00 3,912,300.00
- Outlet 10 A/2P+E 220V unit 4.00 289,510.20 1,158,040.80
- Double Switch 10 A/ 220V plano unit 4.00 39,123.00 156,492.00
- Exhaust Fan 16 Inch, 80 watt ( 2 unit di R. panel LVMDP) unit 5.00 2,892,493.80 14,462,469.00
- Kabel penerangan ke PJU
- - NYFGBY 2 x 4 mm2 meter 612.00 73,290.42 44,853,737.04
- Kabel penerangan ke PJU
- - NYFGBY 2 x 2,5 mm2 meter 163.00 68,334.84 11,138,578.92
- Kabel dari LVMDP ke P. Penerangan R. Genset
- NYFGBY 4 x 6 mm2 meter 12.00 122,585.40 1,471,024.80
- - BC 4 mm2 meter 10.00 53,207.28 532,072.80
- MCB 4 Amp untuk tiap2 tiang lampu unit 10.00 450,696.96 4,506,969.60
- Instalasi titik lampu titik 21.00 997,636.50 20,950,366.50
- Intalasi titik lampu PJU titik 30.00 1,108,485.00 33,254,550.00
- Instalasi Stop kontak titik 4.00 665,091.00 2,660,364.00
- Instalasi exhaust fan titik 5.00 665,091.00 3,325,455.00
Jumlah 2,076,665,284.70
d Pengadaan Elektrikal dan Accessories
1 Trafo dan panel TM ###
- Trafo 1250 kVA, 20kV/380-220V, Dyn 5, dan kelengkapa set 1.00 12,276,439.30 12,276,439.30
Panel Tegangan Menengah (cubicle) 24 kV, incoming
- set 1.00 12,114,907.20 12,114,907.20
dan outgoing with circuit breaker
2 Panel Automatic Main Failure (AMF) dan Change Over Switch (COS) ###
Change Over Switch untuk kapasitas daya 1500 KvA,
- set 1.00 48,459,628.80 48,459,628.80
plus interlock system
- Box Panel, ukuran T:1800 X L:800 X D:600, free standing set 1.00 8,076,604.80 8,076,604.80
3 Panel Induk Utama, LVM-DP ###
- Perakitan dan Pemasangan lengkap termasuk aksesoris set 1.00 807,660.48 807,660.48
4 Panel Penerangan Ruang Listrik Utama (PP-RL) ###
- Perakitan dan Pemasangan lengkap termasuk aksesoris set 1.00 807,660.48 807,660.48
5 Penerangan Ruang listrik utama ###
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 8.00 40,370.00 322,960.00
- Lampu philips 36W/220V, Industrial Type unit 1.00 40,370.00 40,370.00
- Lampu philips 2 x 36W/220V, Water proof unit 4.00 40,370.00 161,480.00
- Outlet 10A / 220 V unit 2.00 24,200.00 48,400.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 2.00 24,200.00 48,400.00
Exhaust fan, Industrial type, wall mounted, 16", komplit
- set 2.00 242,220.00 484,440.00
base frame
- Titik lampu titik 13.00 72,689.44 944,962.73
Jumlah 84,593,913.79

- PEKERJAAN MEKANIKAL DAN ELEKTRIKAL BANGUNAN IPAL 39,456,715.60


Pengadaan / Pemasangan elektrikal dan aksesoris
Panel Penerangan Bangunan Worskshop, kantor dan Gudang
- Penangkal Petir type Elctrode dengan Rmin = 60m LS 1.00 17,650,758.98 17,650,758.98
- Grounding Anchor Rot 4 meter (3/4) unit 5.00 1,255,800.00 6,279,000.00
- - NYA 50 mm2 meter 10.00 244,881.00 2,448,810.00
- Clamp Anchor Rot 50 mm2 unit 2.00 27,627.60 55,255.20
- Air terminal Ø 1, termasuk dudukan, komplit set 1.00 277,173.00 277,173.00
- GIP Ø 3 unit 1.00 2,953,641.60 2,953,641.60
- GIP Ø 2 unit 1.00 200,928.00 200,928.00
- Box control 30x30x70 cm unit 1.00 739,128.00 739,128.00
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 1,317,220.82 1,317,220.82
- Pengesahan Depnaker LS 1.00 7,534,800.00 7,534,800.00
Jumlah 39,456,715.60
- PEKERJAAN MEKANIKAL DAN ELEKTRIKAL RESERVOIR KAPASITAS 2600 M3 Err:509
a Pengadaan dan Pemasangan Mekanikal dan Accesories 0
1 Pompa dan Accessories
- Pompa Centifugal Q 35 l/dt - Head 150 m' 80 KW Efisien Unit 2.00 263,197,400.00 526,394,800.00
- Kabel Power NYFGBY 4 x 120 mm m' 300.00 1,184,612.00 355,383,600.00
- Panel Pompa Variable Speed Drive Paralel Alternate 2 x set 1.00 226,918,503.24 226,918,503.24
- Kabel Power NYFGBY 4 x 95 mm m' 75.00 335,500.00 25,162,500.00
- Skun Kabel 300 mm (Cu) set 24.00 93,500.00 2,244,000.00
- Skun Kabel 95 mm (Cu) set 24.00 21,450.00 514,800.00
- Pressure Transmiter Skala 0 - 15 Bar / 4 - 20 mA Unit 3.00 2,904,000.00 8,712,000.00
- Kabel Data 3 x 2,5 mm m' 30.00 36,300.00 1,089,000.00
- Electrode level set 3.00 330,000.00 990,000.00
2 Perpipaan Hisap (Suction) 0
- Ø 350 mm Strainer staenles steel fl unit 3.00 7,318,080.00 21,954,240.00
- Ø 350 mm x 0,60 m' Double fl - fl ( Wall pipa ) unit 3.00 8,129,028.00 24,387,084.00
- Ø 350 mm DI Gate Valve resilient seat unit 9.00 35,215,297.47 316,937,677.23
- Ø 700 mm Header Steel Pipe m' 18.00 5,626,698.00 101,280,564.00
- Ø 700 mm Flange las unit 6.00 3,190,000.00 19,140,000.00
- Ø 700 mm Blank Flange unit 6.00 14,320,152.00 85,920,912.00
- Ø 350 mm Steel pipa unit 9.00 4,291,248.00 38,621,232.00
- Ø 350 mm x Ø 300 mm Steel Concentris Reducer fl -fl unit 9.00 8,544,076.80 76,896,691.20
- Ø 350 mm Flexible Joint unit 9.00 3,403,594.05 30,632,346.45
- Ø 350 mm Flange buta lubang disesuaikan dengan Pompa unit 9.00 4,557,770.85 41,019,937.65
- Ø 350 mm Flange las unit 18.00 5,399,940.00 97,198,920.00
- Ø 350 mm Flange las unit 18.00 1,402,262.85 25,240,731.30
- Ø 700 mm Karet Packing unit 6.00 108,564.17 651,385.01
- Ø 350 mm Karet Packing unit 24.00 80,136.17 1,923,268.05
- Ø 250 mm Karet Packing unit 3.00 80,136.17 240,408.51
- 1" x 5" Baud mur unit 432.00 42,642.00 18,421,344.00
- 1 1/4" x 5" Baud mur unit 120.00 108,026.40 12,963,168.00
- Ø 400 mm x 0,60 m' ( Wall pipa ) unit 4.00 9,979,125.00 39,916,500.00
- Ø 400 mm Butterfly valve fl-fl resilient seat unit 7.00 66,813,120.00 467,691,840.00
- Ø 400 mm Flange Adaptor unit 4.00 6,561,834.45 26,247,337.80
- Ø 400 mm Flexible Joint unit 3.00 23,639,334.45 70,918,003.35
- Ø 400 mm x Ø 250 mm Steel Concentris Reducer fl -fl unit 3.00 5,748,748.80 17,246,246.40
- Ø 400 mm Flange las unit 19.00 1,290,234.45 24,514,454.55
- Ø 400 mm Karet Packing unit 25.00 46,891.97 1,172,299.22
- M24 Baud mur set 36.00 56,554.13 2,035,948.50
- M27 Baud mur set 400.00 62,097.59 24,839,034.00
- M39 Baud mur set 48.00 71,775.53 3,445,225.20
3 Perpipaan Tekan (Discharge)
- Ø 350 mm x Ø 300 Steel Reducer fl - fl unit 3.00 1,747,680.00 5,243,040.00
- Ø 300 mm Flange las m' 6.00 506,000.00 3,036,000.00
- Ø 350 mm x 750mm' Steel Double Flange (wall pipe) unit 3.00 1,842,720.00 5,528,160.00
- Ø 350 mm Steel pipa m' 18.00 Err:509 Err:509
- Ø 350 mm x 45 Steel Bend fl - fl unit 3.00 - -
- Ø 350 mm DI Gate Valve PN 16 Resilien seat unit 6.00 Err:509 Err:509
- Ø 350 mm DI Cek Valve PN 16 Resilian seat unit 3.00 34,461,504.00 103,384,512.00
- Ø 350 mm Flexible Joint PN 16 unit 3.00 3,033,676.80 9,101,030.40
- Ø 350 mm Karet Packing unit 21.00 58069.6875 1,219,463.44
- Ø 350 mm Karet Packing unit 3.00 58069.6875 174,209.06
- 3/4" x 4" Baud Mur unit 288.00 22,275.00 6,415,200.00
- 12,5 mm x 0,50 Steel Pipa risser m' 3.00 44,770.00 134,310.00
- 12,5 mm Ball Valve unit 3.00 228,800.00 686,400.00
- Manometer Scala 0 - 15 Kg/cm2 unit 3.00 200,112.00 600,336.00
- 12,5 mm x 90 GWI Bend unit 2.00 10,454.40 20,908.80
- 12,5 mm x 12,5 mm GWI Tee unit 1.00 11,880.00 11,880.00
- Ø 350 mm Butterfly valve fl-fl resilient seat unit 3.00 57,187,257.27 171,561,771.81
- Ø 350 mm Flange Adaptor unit 3.00 1,839,200.00 5,517,600.00
- Ø 350 mm Flexible Joint unit 3.00 6,435,000.00 19,305,000.00
- Ø 350 mm x Ø 200 mm Steel Reducer fl -fl unit 3.00 2,718,144.00 8,154,432.00
- Ø 350 mm x 45 Steel Bend fl - fl unit 3.00 1,155,000.00 3,465,000.00
- Ø 350 mm Flange las unit 3.00 880,000.00 2,640,000.00
- Ø 350 mm Karet Packing unit 18.00 36,850.00 663,300.00
- M24 Baud mur set 216.00 44,187.00 9,544,392.00
- M20 Baud mur set 36.00 39,768.30 1,431,658.80
- Ø 700 mm DI Gate Valve metal resilient Seated all flange unit 1.00 133,626,240.00 133,626,240.00
- Ø 700 mm DI Cek Valve PN 16 Resilian seat unit 1.00 176,000,210.10 176,000,210.10
- Box Uk. 2,4x 1,5 x 1,5 m' unit 2.00 14,437,500.00 28,875,000.00
4 Perpipaan Pengumpul (Header)
- Ø 700 mm Header Steel Pipe m' 10.50 9,452,852.64 99,254,952.72
- Ø 700 mm x Ø 500 mm Steel Reducer flange - flange unit 2.00 26,980,800.00 53,961,600.00
- Ø 700 mm Flange las unit 8.00 20,928,378.24 167,427,025.92
- Ø 700 mm Blank Flange unit 1.00 24,057,855.36 24,057,855.36
- Ø 500 mm x 90° Steel Bend flange - flange unit 1.00 10,378,368.00 10,378,368.00
- Ø 500 mm Flange las unit 3.00 7,242,504.19 21,727,512.58
- Ø 500 mm Steel Dresser Joint unit 1.00 19,931,788.80 19,931,788.80
- Box Water Meter Uk. 200 x 1,5 x 2,5 m' Unit 1.00 24,255,000.00 24,255,000.00
- Ø 500 mm x 0,60 m' Pipa Inlet ( Wall Pipe ) unit 3.00 7,971,963.38 23,915,890.15
- 1" x 5" Baud Mur set 80.00 49,896.00 3,991,680.00
- Ø 500 mm Karet Packing unit 2.00 72,219.84 144,439.68
- Ø 700 mm Karet Packing unit 2.00 94,248.00 188,496.00
- Ø 700 mm Karet Packing unit 7.00 94,248.00 659,736.00
- Ø 700 mm Steel Pipe m' 83.00 9,452,852.64 784,586,769.12
- Ø 700 mm x 45° Steel Bend flange - flange unit 2.00 16,354,800.00 32,709,600.00
- Ø 700 mm x 11.25° Steel Bend flange - flange unit 5.00 6,985,440.00 34,927,200.00
- M39 Baud mur set 216.00 94,617.60 20,437,401.60
5 Perpipaan Over Flow dan Penguras
- Ø 500 mm Overflow Steel Pipe m' 10.00 4,482,717.24 44,827,172.44
- Ø 500 mm Penguras Steel Pipe m' 82.00 4,482,717.24 367,582,813.98
- Ø 500 mm Penguras PVC m' 50.00 2,027,953.13 101,397,656.25
- Ø 500 mm Penguras PVC m' 71.50 697,331.25 49,859,184.38
- A.F. Gate Valve PN 10 Ø 350 mm unit 3.00 24,667,500.00 74,002,500.00
- Cek Valve Ø 350 mm Steel unit 2.00 31,449,736.15 62,899,472.30
- Cek Valve Ø 250 mm Steel unit 1.00 25,159,788.92 25,159,788.92
- Ø 500 mm Karet Packing unit 10.00 63,566.25 635,662.50
- Ø 500 mm Karet Packing unit 2.00 43,642.50 87,285.00
- Ø 500 mm Flange las unit 10.00 1,518,000.00 15,180,000.00
- Ø 500 mm Flange Las unit 2.00 781,770.00 1,563,540.00
- M24 Baud mur set 120.00 44,187.00 5,302,440.00
- M20 Baud mur set 24.00 39,768.30 954,439.20
6 Perpipaan Pompa Back wash Air dan Udara
- Ø 100 mm Steel pipe SCH 40 m' 31.50 1,228,254.44 38,690,015.00
- Ø 200 mm Steel pipe SCH 40 m' 31.50 1,545,260.76 48,675,713.82
- Ø 300 mm Steel pipe SCH 40 m' 6.00 4,482,717.24 26,896,303.46
- Ø 300 mm x Ø 200 mm Steel Reducer flange - flange unit 2.00 4,688,798.40 9,377,596.80
- Ø 200 mm x Ø 150 mm Steel Reducer flange - flange unit 2.00 1,707,750.00 3,415,500.00
- Ø 100 mm Butterfly valve seat fl-fl include actuator unit 4.00 7,172,550.00 28,690,200.00
- Ø 200 mm Butterfly valve Lengkap dengan Pneumatic unit 2.00 23,679,405.34 47,358,810.68
- Ø 200 mm flexsible joint unit 4.00 5,233,092.48 20,932,369.92
- Ø 300 mm Blank flange unit 2.00 2,561,625.00 5,123,250.00
- Ø 100 mm x 90° Steel Bend flange - flange unit 2.00 227,700.00 455,400.00
- Ø 200 mm x 90° Steel Bend flange - flange unit 6.00 2,482,221.46 14,893,328.74
- Ø 100 mm Flange las unit 4.00 355,212.00 1,420,848.00
- Ø 200 mm Flange las unit 22.00 711,562.50 15,654,375.00
- Ø 300 mm Flange las unit 2.00 1,518,000.00 3,036,000.00
- Ø 100 mm Karet Packing unit 4.00 16,698.00 66,792.00
- Ø 150 mm Karet Packing unit 2.00 28,462.50 56,925.00
- Ø 200 mm Karet Packing unit 22.00 43,642.50 960,135.00
- Ø 300 mm Karet Packing unit 4.00 63,566.25 254,265.00
- M16 Baud mur set 32.00 29,458.00 942,656.00
- M20 Baud mur set 288.00 39,768.30 11,453,270.40
- M24 Baud mur set 48.00 44,187.00 2,120,976.00
7 Perpipaan Hydrophore
- Ø 500 mm Steel pipe SCH 40 unit 17.00 3,848,332.39 65,421,650.71
- Ø 700 mm x Ø 500 mm Steel Reducer flange - flange unit 1.00 13,151,369.09 13,151,369.09
- Ø 700 mm x Ø 700 Tee y flange - flange unit 1.00 7,400,250.00 7,400,250.00
- Ø 500 mm x 90° Steel Bend flange - flange unit 6.00 8,525,088.00 51,150,528.00
- Ø 500 mm x 45° Steel Bend flange - flange unit 1.00 8,570,628.00 8,570,628.00
- Gate Valve Ø 500 mm Resellient seat lengkap dengan floor unit 2.00 145,582,272.00 291,164,544.00
- Ø 500 mm Flange las unit 10.00 5,949,199.87 59,491,998.72
- Ø 500 mm Karet Packing unit 8.00 59,323.44 474,587.52
- M30 Baud mur set 160.00 70,430.65 11,268,903.36
- Ø 100 mm Steel pipe SCH 40 m' 40.00 982,603.56 39,304,142.22
- Check Valve Ø 100 mm unit 2.00 5,464,800.00 10,929,600.00
- Realase Valve Ø 75 mm unit 2.00 3,339,600.00 6,679,200.00
- Manometer Scala 0 - 15 Kg/cm2 unit 2.00 276,154.56 552,309.12
8 Sarana Prasarana
- Electric Motor Hoist kapasitas 5 Ton Horizontal dan Vertic unit 1.00 98,518,200.00 98,518,200.00
- Electric Motor Hoist crane, Kapasitas 2 ton, lengkap dengan set 1.00 57,462,493.44 57,462,493.44
- Pengadaan dan Pemasangan Extended Stem Valve set 3.00 3,015,206.56 9,045,619.69
- IWF Baja 150 x 300 mm Kg 480.00 - -
- Tangki air vessel Kapasitas L 10 m3, Tekanan 16kg/cm2, set 2.00 715,183,355.04 1,430,366,710.08
Jumlah Err:509

b Pengadaan dan Pemasangan Elektrikal dan Accesories


1 Panel workshop (PK-WK)
- Box Panel Unit 1.00 14,214,000.00 14,214,000.00
- Bus Bar 3P+N/205A +PE dan acessories set 1.00 35,535,000.00 35,535,000.00
- MCCB 3P (100-125)A 36 KA + electronic trip set 1.00 3,647,500.00 3,647,500.00
- MCCB 3P (80-100)A 25 KA + electronic trip set 1.00 3,647,394.73 3,647,394.73
- MCB 3P/16A 10A unit 2.00 327,973.39 655,946.78
- MCB 3P/40A 10A unit 2.00 505,427.59 1,010,855.18
- MCB 3P/25A 10A unit 2.00 327,973.39 655,946.78
- MCB 3P/20A 10A unit 2.00 327,973.39 655,946.78
- Volt meter (0-500)V, Uk 72x72 unit 1.00 387,090.00 387,090.00
- VS (Voltage selector switch, 7 posisi) unit 1.00 218,212.50 218,212.50
- Plug dan Socket 2P + E 16A, 220 VAC, Panel mounted, ko set 1.00 409,605.01 409,605.01
- Plug dan Socket 3P + N + E 16A, 380 VAC, Panel mounted set 1.00 409,605.01 409,605.01
- Grounding, Perakitan dan Pemasangan lengkap termasuk ak LS 1.00 57,500.00 57,500.00
2 Panel Penerangan Ruang Kantor (PP-KR)
- Box plastic mini pragma pintu transparant, inbow, 36 modu unit 1.00 780,441.75 780,441.75
- MCB 3P/16A 10 KA unit 1.00 327,973.39 327,973.39
- RCCB/ELCB, 4P, 25A, Sensitifitas : 30 mA unit 1.00 980,751.34 980,751.34
- MCB 1P/6A 6 KA unit 3.00 69,714.15 209,142.45
- MCB 1P/10A 6 KA unit 7.00 69,714.15 487,999.05
- Box plastic mini pragma pintu transparant, inbow, 12 modu unit 1.00 531,300.00 531,300.00
- RCCB/ELCB, 4P, 16A, Sensitifitas : 30 mA unit 1.00 2,270,776.20 2,270,776.20
- MCB 3P, 32 Amp unit 1.00 1,208,707.50 1,208,707.50
- MCB 3P, 16 Amp unit 1.00 1,907,367.00 1,907,367.00
- MCB 1P/4A 6 KA unit 4.00 278,932.50 1,115,730.00
- MCB 1P/6A 6 KA unit 4.00 69,714.15 278,856.60
- MCB 1P/16A 6 KA unit 1.00 345,345.00 345,345.00
- Lampu TL / DL 2 X 18 watt Unit 15.00 112,901.25 1,693,518.75
- Lampu TL / DL 2 X 36 watt Unit 22.00 112,901.25 2,483,827.50
- Exhaust fan 40 watt Unit 2.00 758,696.40 1,517,392.80
- Outlet 10 A/2P+E 220V Unit 16.00 294,871.50 4,717,944.00
- Stop kontak AC Unit 4.00 66,412.50 265,650.00
- Double Switch 10 A/ 220V plano Unit 5.00 39,847.50 199,237.50
- Single switch 10 A/ 220V plano Unit 2.00 32,257.50 64,515.00
- Saklar Hotel Unit 1.00 569,022.30 569,022.30
- Instalasi titik lampu titik 12.00 1,016,111.25 12,193,335.00
- Instalasi stop kontak titik 20.00 677,407.50 13,548,150.00
- Instalasi exhaust fan titik 2.00 677,407.50 1,354,815.00
- Kabel dari Panel P. Lt 1 ke P. Penerangan R. Kimia
- NYFGBY 4 x 10 mm2 meter 45.00 301,778.40 13,580,028.00
- BC 4 mm2 meter 20.00 54,192.60 1,083,852.00
- Box plastic mini pragma pintu transparant, inbow, 12 modu unit 1.00 531,300.00 531,300.00
- RCCB/ELCB, 4P, 16A, Sensitifitas : 30 mA unit 1.00 2,270,776.20 2,270,776.20
- MCB 3P, 16 Amp unit 1.00 1,907,367.00 1,907,367.00
- MCB 1P/4A 6 KA unit 1.00 278,932.50 278,932.50
- MCB 1P/6A 6 KA unit 3.00 69,714.15 209,142.45
- MCB 1P/10A 6 KA unit 1.00 69,714.15 69,714.15
- MCB 1P/16A 6 KA unit 1.00 345,345.00 345,345.00
- Lampu TL / DL 1 X 32 watt Unit 11.00 112,901.25 1,241,913.75
- Exhaust fan 40 watt Unit 3.00 758,696.40 2,276,089.20
- Outlet 10 A/2P+E 220V Unit 11.00 294,871.50 3,243,586.50
- Stop kontak AC Unit 3.00 66,412.50 199,237.50
- Double Switch 10 A/ 220V plano Unit 5.00 39,847.50 199,237.50
- Single switch 10 A/ 220V plano Unit 3.00 32,257.50 96,772.50
- Saklar Hotel Unit 1.00 569,022.30 569,022.30
- Instalasi stop kontak titik 14.00 677,407.50 9,483,705.00
- Instalasi exhaust fan titik 3.00 677,407.50 2,032,222.50
- Kabel dari P. Penerangan Lt 2 ke P. Penerangan Lt. 1
- NYY 4 x 4 mm2 meter 7.00 301,778.40 2,112,448.80
- BC 4 mm2 meter 7.00 54,192.60 379,348.20
- Skun Kabel 10 mm (Cu) set 4.00 398,475.00 1,593,900.00
- Skun Kabel 4 mm (Cu) set 6.00 172,672.50 1,036,035.00
3 Terminal board Grounding (1B-G)
- Box Panel unit 1.00 1,185,937.50 1,185,937.50
- Accessories penunjang termasuk busbar, isolator, supporting LS 1.00 1,713,653.62 1,713,653.62
- Grounding, Perakitan dan Pemasangan lengkap termasuk ak LS 1.00 57,500.00 57,500.00
4 Panel Penerangan Lampu Luar Air Bersih (PP-LR3)
- Box Panel outdoor type unit 1.00 464,887.50 464,887.50
- MCB 3P/20A 6 KA unit 2.00 327,973.39 655,946.78
- Contactor, 3P, 32 A AC1, 380 V unit 1.00 684,048.75 684,048.75
- Photo cell unit 1.00 167,185.73 167,185.73
- MCB 1P/10A 6 KA unit 2.00 69,714.15 139,428.30
- Grounding, Perakitan dan Pemasangan lengkap termasuk ak LS 1.00 57,500.00 57,500.00
5 Panel penerangan Ruang Pompa Air Bersih (PP-AB)
- Box Plastic mini pragma pintu tranparant, inbow, 12 modul unit 1.00 322,195.50 322,195.50
- MCB 3P/16A 10 KA unit 1.00 327,973.39 327,973.39
- RCCB/ELCB, 4P, 25A, Sensitifitas : 30 mA unit 1.00 980,751.34 980,751.34
- MCB 1P/6A 6 KA unit 6.00 69,714.15 418,284.90
- MCB 1P/10A 6 KA unit 4.00 69,714.15 278,856.60
- Grounding, Perakitan dan Pemasangan lengkap termasuk ak LS 1.00 57,500.00 57,500.00
6 Penerangan Ruang Kantor/ Laboratorium/ Ruang Kendali
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 8.00 683,100.00 5,464,800.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 2.00 910,800.00 1,821,600.00
- Lampu Phillips 2 x 36W/220V, waterproof unit 8.00 910,800.00 7,286,400.00
- Single switch 10 A/ 220V plano unit 18.00 32,257.50 580,635.00
- Double Switch 10 A/ 220V plano unit 4.00 39,847.50 159,390.00
- Outlet 10A / 220V unit 10.00 158,826.44 1,588,264.43
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 3.00 437,469.31 1,312,407.92
- Kabel NYM 3 x 2,5 mm2 m 250.00 24,667.50 6,166,875.00
- uPVC Conduit 20 m m 175.00 14,895.38 2,606,690.63
- uPVC Conduit 25 mm m 2.00 30,360.00 60,720.00
- Exhaust fan, Industrial type, wall mounted, 16", komplit ba set 2.00 1,005,675.00 2,011,350.00
- Air Conditioning, Cooling Capacity 1350W, 1 phase, wall set 2.00 9,392,625.00 18,785,250.00
- Grounding, Perakitan dan Pemasangan lengkap termasuk ak LS 1.00 57,500.00 57,500.00
7 Penerangan Ruang Pompa Air Bersih
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 8.00 683,100.00 5,464,800.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 8.00 910,800.00 7,286,400.00
- Single switch 10 A/ 220V plano unit 6.00 32,257.50 193,545.00
- Double Switch 10 A/ 220V plano unit 4.00 39,847.50 159,390.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 2.00 437,469.31 874,938.62
- Kabel NYM 3 x 2,5 mm2 m 180.00 24,667.50 4,440,150.00
- uPVC Conduit 20 m m 150.00 14,895.38 2,234,306.25
- uPVC Conduit 25 mm m 2.00 30,360.00 60,720.00
- Exhaust fan, Industrial type, wall mounted, 16", komplit ba set 2.00 1,005,675.00 2,011,350.00
8 Panel Penerangan Work shop (PP-WS)
- Box Plastic mini pragma pintu tranparant, inbow, 24 modul unit 1.00 513,843.00 513,843.00
- MCB 3P/16A 10 KA unit 1.00 327,973.39 327,973.39
- RCCB/ELCB, 4P, 25A, Sensitifitas : 30 mA unit 1.00 980,751.34 980,751.34
- MCB 1P/6A 6 KA unit 4.00 69,714.15 278,856.60
- MCB 1P/10A 6 KA unit 3.00 69,714.15 209,142.45
- Grounding, Perakitan dan Pemasangan lengkap termasuk ak LS 1.00 57,500.00 57,500.00
9 Panel Penerangan Work Shop (PP-WS) Lantai 2 (Office)
- Box Plastic mini pragma pintu tranparant, inbow, 24 modul unit 1.00 513,843.00 513,843.00
- Box Plastic mini pragma pintu tranparant, inbow, 12 modul unit 1.00 322,195.50 322,195.50
- MCB 3P/16A 10 KA unit 1.00 327,973.39 327,973.39
- RCCB/ELCB, 4P, 25A, Sensitifitas : 30 mA unit 1.00 980,751.34 980,751.34
- MCB 1P/6A 6 KA unit 12.00 69,714.15 836,569.80
- MCB 1P/10A 6 KA unit 9.00 69,714.15 627,427.35
- Grounding, Perakitan dan Pemasangan lengkap termasuk ak LS 1.00 57,500.00 57,500.00
10 Penerangan Ruang Workshop
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 8.00 683,100.00 5,464,800.00
- Lampu philips 2 x 36W/220V, WP (Water proof) unit 8.00 910,800.00 7,286,400.00
- Lampu Phillips 18W/220V, Baret type unit 2.00 910,800.00 1,821,600.00
- Mercury 250 watt with industrial cap type high-bay reflect unit 4.00 1,166,962.50 4,667,850.00
- Single switch 10 A/ 220V plano unit 6.00 32,257.50 193,545.00
- Double Switch 10 A/ 220V plano unit 4.00 39,847.50 159,390.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 2.00 437,469.31 874,938.62
- Kabel NYM 3 x 2,5 mm2 m 180.00 24,667.50 4,440,150.00
- uPVC Conduit 20 m m 150.00 14,895.38 2,234,306.25
- uPVC Conduit 25 mm m 2.00 30,360.00 60,720.00
- Exhaust fan, Industrial type, wall mounted, 16", komplit ba set 2.00 1,005,675.00 2,011,350.00
11 Penangkal Petir Bangunan Workshop, Lab dan Office
- Penangkal Petir type Elctrode dengan Rmin = 60m LS 1.00 18,669,072.00 18,669,072.00
- BC 50 mm2 m 56.00 93,926.25 5,259,870.00
- Clamp BC, 50 mm2 unit 200.00 69,660.72 13,932,143.28
- Air terminal Ø 1, termasuk dudukan, komplit set 8.00 1,184,232.18 9,473,857.43
- GIP Ø 2 termasuk socket set 2.00 1,142,435.76 2,284,871.51
- Grounding rod 3/4 set 2.00 487,625.01 975,250.03
- Pipa PVC Ø 1, termasuk clamp set 2.00 501,557.16 1,003,114.32
- Box control 30x30x70 cm LS 2.00 1,462,875.04 2,925,750.09
- Grounding, Perakitan dan Pemasangan lengkap termasuk ak LS 1.00 57,500.00 57,500.00
12 Penangkal Petir Bangunan Pompa Air Bersih
- Penangkal Petir type Elctrode dengan Rmin = 60m LS 1.00 18,669,072.00 18,669,072.00
- BC 50 mm2 m 74.00 93,926.25 6,950,542.50
- Clamp BC, 50 mm2 unit 250.00 69,660.72 17,415,179.10
- Air terminal Ø 1, termasuk dudukan, komplit set 4.00 1,184,232.18 4,736,928.72
- GIP Ø 2 termasuk socket set 4.00 1,142,435.76 4,569,743.03
- Grounding rod 3/4 set 2.00 487,625.01 975,250.03
- Pipa PVC Ø 1, termasuk clamp set 2.00 501,557.16 1,003,114.32
- Box control 30x30x70 cm LS 2.00 1,462,875.04 2,925,750.09
- Grounding, Perakitan dan Pemasangan lengkap termasuk ak LS 1.00 57,500.00 57,500.00
13 Panel Pompa Kontrol Back Wash
- Box Plate metal, 2000x800x600 mm, Floor Standing Unit 1.00 21,881,590.50 21,881,590.50
- MCCB 3 POLE, 200 A Unit 1.00 15,846,288.15 15,846,288.15
- Current Transformator 200/5 A Unit 3.00 1,437,432.15 4,312,296.45
- Power Meter Digital Unit 1.00 3,187,800.00 3,187,800.00
- Indicator Lamp R, S, T Unit 7.00 108,916.50 762,415.50
- LAMPU TL 10 watt Unit 1.00 112,901.25 112,901.25
- MINI FUSE 2A Unit 3.00 242,804.10 728,412.30
- Push Bottom Unit 1.00 108,916.50 108,916.50
- Emergency Push Button Unit 1.00 683,517.45 683,517.45
- Buzzer, 70 dBA Unit 1.00 35,103.75 35,103.75
- Plug in relay 220V, 14 pin, 4 kontak C/O, 5 amp, built i Unit 6.00 80,643.75 483,862.50
- Illuminated Push Button, 220VAC Unit 8.00 820,858.50 6,566,868.00
- Selector Switch 3 Posisi Unit 4.00 590,008.65 2,360,034.60
- MCCB 3 POLE, 80 A Unit 4.00 3,801,451.50 15,205,806.00
- MCB 3 POLE, 32 A Unit 2.00 1,208,707.50 2,417,415.00
- MCB 3 POLE, 6 A Unit 1.00 2,269,713.60 2,269,713.60
- MCB 3 POLE, 16 A Unit 1.00 2,269,713.60 2,269,713.60
- MCB 2 POLE, 6 A Unit 2.00 1,694,050.05 3,388,100.10
- MCB 1P/4A 6 KA Unit 3.00 278,932.50 836,797.50
- MAGNETIC CONTACTOR LC1-D50 Unit 4.00 6,876,084.60 27,504,338.40
- MAGNETIC CONTACTOR LC1-D40 Unit 2.00 5,777,621.85 11,555,243.70
- MAGNETIC CONTACTOR LC1-D25 Unit 2.00 5,777,621.85 11,555,243.70
- Thermal Overload LR-D340 Unit 2.00 4,845,987.30 9,691,974.60
- Thermal Overload LR-D21 Unit 2.00 1,910,289.15 3,820,578.30
- Power Supply DC 220VAC / 24VDC 10A Unit 1.00 10,372,304.25 10,372,304.25
- Kabel tray 200x 100 Btg 3.00 4,899,648.60 14,698,945.80
- Grounding, Perakitan dan Pemasangan lengkap termasuk ak LS 1.00 57,500.00 57,500.00
14 Panel Kontrol Distribusi
- Box Plate metal, 3400x2100x1000 mm, Floor Standing Unit 1.00 21,881,590.50 21,881,590.50
- MCCB 3 POLE, 630 A Unit 1.00 15,846,288.15 15,846,288.15
- Current Transformator 1000/5 A Unit 3.00 1,437,432.15 4,312,296.45
- Power Meter Digital Unit 1.00 3,187,800.00 3,187,800.00
- Indicator Lamp R, S, T Unit 3.00 108,916.50 326,749.50
- LAMPU TL 10 watt Unit 3.00 112,901.25 338,703.75
- MINI FUSE 2A Unit 3.00 242,804.10 728,412.30
- Push Bottom Unit 6.00 108,916.50 653,499.00
- Emergency Push Button Unit 1.00 683,517.45 683,517.45
- Buzzer, 70 dBA Unit 1.00 35,103.75 35,103.75
- Plug in relay 220V, 14 pin, 4 kontak C/O, 5 amp, built i Unit 12.00 80,643.75 967,725.00
- Illuminated Push Button, 220VAC Unit 6.00 820,858.50 4,925,151.00
- Selector Switch 3 Posisi Unit 3.00 590,008.65 1,770,025.95
- 3 POLE, 1000 A Unit 1.00 531,300.00 531,300.00
- MCB 3 POLE, 6 A Unit 5.00 2,269,713.60 11,348,568.00
- MCB 3 POLE, 10 A Unit 1.00 2,269,713.60 2,269,713.60
- MAGNETIC CONTACTOR LC1-F500 Unit 4.00 6,876,084.60 27,504,338.40
- Power Supply DC 220VAC / 24VDC 10A Unit 1.00 10,372,304.25 10,372,304.25
- Kabel tray 200x 100 Btg 3.00 4,899,648.60 14,698,945.80
- Grounding, Perakitan dan Pemasangan lengkap termasuk ak LS 1.00 57,500.00 57,500.00
15 Panel Meja Kontrol Filter Utama
- Box Plate metal, 1250x1600x1040 mm, FS Meja Unit 1.00 26,565,000.00 26,565,000.00
- MCB 1P/4A 6 KA unit 3.00 278,932.50 836,797.50
- Plug in relay 220V, 14 pin, 4 kontak C/O, 5 amp, built i unit 36.00 80,643.75 2,903,175.00
- Plug in relay 220V, 14 pin, 4 kontak C/O, 5 amp, built i unit 15.00 80,643.75 1,209,656.25
- Illuminated Push Button, 220VAC unit 36.00 820,858.50 29,550,906.00
- Illuminated Push Button, 220VAC unit 36.00 820,858.50 29,550,906.00
- Selector Switch 3 Posisi unit 7.00 590,008.65 4,130,060.55
- Power Supply DC 220VAC / 24VDC 10A unit 1.00 10,372,304.25 10,372,304.25
- Emergency Switch unit 1.00 683,517.45 683,517.45
- Push Bottom unit 2.00 108,916.50 217,833.00
- Indicator Lamp R, S, T unit 2.00 108,916.50 217,833.00
- Air Regulator unit 1.00 3,793,482.00 3,793,482.00
- Air Pressure Switch unit 1.00 4,293,966.60 4,293,966.60
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 57,500.00 57,500.00
16 Panel Filter ( Selenoid )
- Panel Lokal Filter Outdoor type double door dengan suppor unit 6.00 9,297,750.00 55,786,500.00
- Selenoid valve + manifold 6 selenoid (by others)
- Plug in relay 220V, 14 pin, 4 kontak C/O, 5 amp, built i unit 30.00 80,643.75 2,419,312.50
- Illuminated Push Button Green, 220VAC unit 30.00 820,858.50 24,625,755.00
- Illuminated Push Button Red, 220VAC unit 30.00 820,858.50 24,625,755.00
- Selector Switch 3 Posisi unit 30.00 590,008.65 17,700,259.50
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 57,500.00 57,500.00
17 Panel Kontrol Filter ( kontrol )
- Box Plate metal, 600x500x200 mm, Wall Mounting unit 1.00 7,969,500.00 7,969,500.00
- MCB 3P/6A, 6 KA unit 1.00 2,269,713.60 2,269,713.60
- RCCB/ELCB, 4P, 10A, Sensitifitas : 30 mA unit 1.00 1,604,526.00 1,604,526.00
- MCB 1P/4A 6 KA unit 5.00 278,932.50 1,394,662.50
- MCB 1P/6A 6 KA unit 1.00 69,714.15 69,714.15
- Time Switch 24 Jam unit 1.00 2,276,089.20 2,276,089.20
- Magnetic Contactor 10A unit 1.00 2,400,944.70 2,400,944.70
- Indicator Lamp R, S, T unit 3.00 108,916.50 326,749.50
- Mini Fuse 2A unit 4.00 242,804.10 971,216.40
- Selector Switch 3 Posisi unit 1.00 590,008.65 590,008.65
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 57,500.00 57,500.00
18 Instalasi Penerangan R. Pompa
- Lampu TL 2 X 18 watt unit 12.00 112,901.25 1,354,815.00
- Lampu TL 2 x 36 watt unit 9.00 112,901.25 1,016,111.25
- Outlet 10 A/2P+E 220V unit 1.00 294,871.50 294,871.50
- Stop kontak AC unit 1.00 66,412.50 66,412.50
- Double Switch 10 A/ 220V plano unit 2.00 39,847.50 79,695.00
- Single switch 10 A/ 220V plano unit 2.00 32,257.50 64,515.00
- Instalasi titik lampu titik 21.00 1,016,111.25 21,338,336.25
- Instalasi stop kontak titik 2.00 677,407.50 1,354,815.00
- Kabel dari penerangan Pompa ke Panel Pompa Distribusi
- - NYY 5 x 2,5 mm2 meter 15.00 75,975.90 1,139,638.50
19 Panel Penerangan R. Kontrol dan R. Backwash
- Box plastic mini pragma pintu transparant, inbow, 12 modu unit 1.00 531,300.00 531,300.00
- RCCB/ELCB, 4P, 10A, Sensitifitas : 30 mA unit 1.00 1,604,526.00 1,604,526.00
- MCB 3P, 10 Amp unit 1.00 2,269,713.60 2,269,713.60
- MCB 1P/4A 6 KA unit 5.00 278,932.50 1,394,662.50
- MCB 1P/6A 6 KA unit 1.00 69,714.15 69,714.15
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00 57,500.00 57,500.00
20 Instalasi Penerangan R. Kontrol dan R. Backwash
- Lampu TL 2 X 18 watt unit 6.00 112,901.25 677,407.50
- Outlet 10 A/2P+E 220V unit 5.00 294,871.50 1,474,357.50
- Stop kontak 3P 6 Amp (pug & soket) unit 1.00 1,142,029.35 1,142,029.35
- Stop kontak AC unit 2.00 66,412.50 132,825.00
- Double Switch 10 A/ 220V plano unit 2.00 39,847.50 79,695.00
- Single switch 10 A/ 220V plano unit 5.00 32,257.50 161,287.50
- Instalasi titik lampu titik 6.00 1,016,111.25 6,096,667.50
- Instalasi stop kontak titik 8.00 677,407.50 5,419,260.00
- Kabel dari P. Penerangan R. Kontrol ke Panel Backwash
- - NYY 5 x 2,5 mm2 meter 20.00 75,975.90 1,519,518.00
Jumlah 984,590,927.37

- PEKERJAAN MEKANIKAL DAN ELEKTRIKAL LUAR BANGUNAN 7,639,703,716.87


a Pengadaan dan Pemasangan kabel-kabel
1 Biaya Penyambungan Baru Pelanggan TM 1385 KVA
- BP + UJL Unit 1.00 497,196,750.00 497,196,750.00
- Jasa Pengurusan SLO Ls 638,250.00 50.00 31,912,500.00
2 Kabel dari PLN ke Panel TM, Primer Trafo, Sekunder Trafo, Genset, MDP ke masing - masing panel (Air Baku, Air bersih, Blower, Dosing, Panel Penerangan, Genset )
- Dari meter PLN ke Panel TM (cubicle)
- Kabel XLPE 1 x 35 mm2 12/20/kV m 75.00 182,160.00 13,662,000.00
- Terminating kabel XLPE, 35 mm2 set 6.00 5,088,261.02 30,529,566.14
- Dari meter Panel TM (cubicle) ke primer trafo ###
- Kabel XLPE 1 x 35 mm2 12/20/kV m 30.00 182,160.00 5,464,800.00
- Terminating kabel XLPE, 35 mm2 set 6.00 5,088,261.02 30,529,566.14
- Dari Sekunder trafo ke Panel MDP ###
- Kabel NYY 1 x 240 mm2 m 80.00 437,713.00 35,017,040.00
- Dari Generator 2x625 kVA ke Panel MDP ###
- Kabel NYY 1 x 240 mm2 m 80.00 437,713.00 35,017,040.00
- Kabel NYY 1 x 240 mm2 m 80.00 437,713.00 35,017,040.00
- Kabel NYA 1 x 120 mm2 m 30.00 104,500.00 3,135,000.00
- Dari Panel MDP ke panel M-PK (Pompa Doosing Kimia) ###
- Kabel NYFGbY 4 x 16 mm2 m 183.00 123,337.50 22,570,762.50
- Kabel NYA 1 x 16 mm2 m 183.00 24,667.50 4,514,152.50
- Dari Panel MDP ke Panel M-FL (Filter) ###
- Kabel NYFGbY 4 x 35 mm2 m 102.00 237,187.50 24,193,125.00
- Kabel NYA 1 x 25 mm2 m 102.00 39,847.50 4,064,445.00
- Kabel NYFGbY 4 x 95 mm2 m 85.00 578,737.50 49,192,687.50
- Kabel NYA 1 x 70 mm2 m 85.00 102,465.00 8,709,525.00
- Dari Panel MDP ke panel DP - WS (Workshop) ###
- Kabel NYFGbY 4 x 35 mm2 m 183.00 237,187.50 43,405,312.50
- Kabel NYA 1 x 25 mm2 m 183.00 39,847.50 7,292,092.50
- Dari Panel MDP ke panel PC-AB (Air Bersih) ###
- Kabel NYFGbY 4 x 300 mm2 m 30.00 1,774,162.50 53,224,875.00
- Kabel NYA 1 x 120 mm2 m 30.00 180,262.50 5,407,875.00
- Dari Panel MDP ke panel PC-ABK (Air Baku) ###
- Kabel NYFGbY 4 x 300 mm2 m 80.00 1,774,162.50 141,933,000.00
- Kabel NYA 1 x 120 mm2 m 80.00 180,262.50 14,421,000.00
- Kabel NYFGbY 4 x 95 mm2 m 80.00 578,737.50 46,299,000.00
- Kabel NYA 1 x 70 mm2 m 80.00 102,465.00 8,197,200.00
- Dari MDP ke Panel TB-G (terminal Box Grounding) ###
- Kabel NYA 1 x 120 mm2 m 9.00 180,262.50 1,622,362.50
- Dari panel TB-G ke box control ###
- Kabel NYA 1 x 120 mm2 m 24.00 180,262.50 4,326,300.00
- Acessories ###
- GIP 1 " m 4.00 110,342.57 441,370.26
- GIP 2" m 20.00 212,520.00 4,250,400.00
- GIP 3" m 8.00 313,467.00 2,507,736.00
- GIP 4" m 16.00 485,076.90 7,761,230.40
2 Kabel daya ke sub panel / panel penerangan ###
- Dari Panel MDP ke panel PP-RL ###
- Kabel NYY 4 x 4 mm2 m 7.00 67,914.00 475,398.00
- Kabel NYA 1 x 6 mm2 m 7.00 42,966.00 300,762.00
- uPVC Conduit 25 mm m 2.00 18,480.00 36,960.00
- Dari Panel M-PK ke panel PP-RJ (PP Ruang Jaga) ###
- Kabel NYFGbY 3 x 4 mm2 m 40.00 61,561.50 2,462,460.00
- GIP 1 " m 3.00 67,165.04 201,495.12
- uPVC Conduit 25 mm m 2.00 18,480.00 36,960.00
- Dari Panel M-PK ke panel PP-RK ###
- Kabel NYY 4 x 4 mm2 m 25.00 67,914.00 1,697,850.00
- Kabel NYA 1 x 6 mm2 m 25.00 42,966.00 1,074,150.00
- GIP 1 " m 2.00 100,429.04 200,858.08
- uPVC Conduit 25 mm m 2.00 51,744.00 103,488.00
- Dari Panel M-PK ke panel PP-KR ###
- Kabel NYY 4 x 6 mm2 m 20.00 81,774.00 1,635,480.00
- Kabel NYA 1 x 6 mm2 m 20.00 42,966.00 859,320.00
- GIP 1 " m 2.00 67,165.04 134,330.08
- uPVC Conduit 25 mm m 2.00 18,480.00 36,960.00
- Dari Panel PC-ABK ke panel PP-ABK ###
- Kabel NYY 4 x 4 mm2 m 7.00 67,914.00 475,398.00
- Kabel NYA 1 x 6 mm2 m 7.00 42,966.00 300,762.00
- uPVC Conduit 25 mm m 2.00 18,480.00 36,960.00
- Dari Panel F-FL ke panel PP - RL2 ###
- Kabel NYY 4 x 6 mm2 m 7.00 81,774.00 572,418.00
- Kabel NYA 1 x 6 mm2 m 7.00 42,966.00 300,762.00
- Dari Panel M-FL ke panel PP-FL ###
- Kabel NYY 4 x 6 mm2 m 7.00 81,774.00 572,418.00
- Kabel NYA 1 x 6 mm2 m 7.00 42,966.00 300,762.00
- GIP 1 " m 2.00 67,165.04 134,330.08
- Dari Panel M-FL ke Panel PC-BWR ###
- Kabel NYY 4 x 4 mm2 m 150.00 67,914.00 10,187,100.00
- Kabel NYA 1 x 6 mm2 m 40.00 42,966.00 1,718,640.00
- Dari panel M-FL ke panel MOBV filter ###
- Kabel NYY 4 x 2.5 mm2 m 150.00 56,364.00 8,454,600.00
- Dari Panel M-FL ke panel PC-BWR ###
- Kabel NYFGbY 4 x 25 mm2 m 80.00 142,989.00 11,439,120.00
- Kabel NYA 1 x 25 mm2 m 80.00 57,519.00 4,601,520.00
- GIP 2" m 8.00 129,360.00 1,034,880.00
- Dari Panel PC-BWR ke panel PP-BWR ###
- Kabel NYY 3x4 mm2 m 7.00 59,829.00 418,803.00
- Kabel NYA 1 x 6 mm2 m 7.00 42,966.00 300,762.00
- uPVC Conduit 25 mm m 2.00 18,480.00 36,960.00
- Dari Panel PC-BW ke panel PP-BW ###
- Kabel NYY 4 x 4 mm2 m 7.00 67,914.00 475,398.00
- Kabel NYA 1 x 6 mm2 m 7.00 42,966.00 300,762.00
- uPVC Conduit 25 mm m 2.00 18,480.00 36,960.00
- Dari Panel PC-AB ke panel PP-LR3 ###
- Kabel NYFGbY 4 x 6 mm2 m 15.00 74,844.00 1,122,660.00
- Kabel NYA 1 x 6 mm2 m 15.00 42,966.00 644,490.00
- Dari panel PP - LR3 ke panel PP-PJ ###
- Kabel NYY 4 x 4 mm2 m 7.00 67,914.00 475,398.00
- uPVC Conduit 25 mm m 2.00 18,480.00 36,960.00
- Dari Panel PC-AB ke panel PP-AB ###
- Kabel NYY 4 x 4 mm2 m 7.00 67,914.00 475,398.00
- Kabel NYA 1 x 6 mm2 m 7.00 42,966.00 300,762.00
- uPVC Conduit 25 mm m 2.00 18,480.00 36,960.00
- Dari Panel PC-ABK ke panel PP-LR1 ###
- Kabel NYFGbY 4 x 6 mm2 m 15.00 74,844.00 1,122,660.00
- Kabel NYA 1 x 6 mm2 m 15.00 42,966.00 644,490.00
3 Kabel daya dan kontrol dari masing - masing panel kontrol ke masing - masing motor, ukuran kabel sesuai dengan spesifikasi masing - masing motor ###
- Dari Panel PC -AB ke terminal motor, pompa Air Bersih ###
- Kabel NYY 3 x 70 mm2 m 120.00 322,575.00 38,709,000.00
- Kabel NYA 1 x 70 mm2 m 60.00 102,465.00 6,147,900.00
- Dari Panel PC -AB ke terminal motor, pompa backwash ###
- Kabel NYY 3 x 6 mm2 m 72.00 60,720.00 4,371,840.00
- Kabel NYA 1 x 6 mm2 m 36.00 15,939.00 573,804.00
- Dari Panel PC -ABK ke terminal motor, pompa air baku ###
- Kabel NYY 3 x 35 mm2 m 80.00 180,262.50 14,421,000.00
- Kabel NYA 1 x 35 mm2 m 20.00 53,130.00 1,062,600.00
- Dari Panel PC -ABK ke terminal motor blower ###
- Kabel NYY 3 x 6 mm2 m 40.00 60,720.00 2,428,800.00
- Kabel NYA 1 x 6 mm2 m 20.00 15,939.00 318,780.00
- Dari Panel PC -ABK ke terminal motor air compressor ###
- Kabel NYY 3 x 6 mm2 m 100.00 60,720.00 6,072,000.00
- Kabel NYA 1 x 6 mm2 m 12.00 15,939.00 191,268.00
- Dari Panel PC -ABK ke terminal motor mixer/pompa dosing/blower ###
- Kabel NYY 4 x 2.5 mm2 m 100.00 37,950.00 3,795,000.00
- Dari Panel PC -ABK ke local control panel (LCP-MX/BW/AL/SA) ###
- Kabel NYY 3 x 2.5 mm2 m 80.00 28,462.50 2,277,000.00
- Dari Panel PC -ABK ke masing-masing pneumatice valve ###
- Kabel NYY 3 x 2.5 mm2 m 600.00 28,462.50 17,077,500.00
- Dari Panel M-FL ke masing-masing pneumatice valve sludge drain ###
- Kabel NYY 3 x 2.5 mm2 m 100.00 28,462.50 2,846,250.00
- Dari Panel PC-ABK ke LCP-ABK 1/2/3 ###
- Kabel NYY 3 x 2.5 mm2 m 66.00 28,462.50 1,878,525.00
- Acessories ###
- Supporting kabel/rak LS 1.00 13,792,821.85 13,792,821.85
4 Kabel dari Panel Dosing ke peralatan ###
- Kabel dari Panel Dosing ke LVMDP ###
- NYFGBY 4 x 70 mm2 meter 150.00 584,430.00 87,664,500.00
- BC 35 mm2 meter 30.00 157,264.80 4,717,944.00
- Kabel dari Panel Dosing ke Dosing pumps ###
- NYY 4 x 2.5 mm2 meter 95.00 35,756.89 3,396,904.50
- NYYHY 3 x 1,5 mm2 meter 110.00 39,050.55 4,295,560.50
- Kabel dari Panel Dosing ke Mixer ###
- NYY 4 x 2,5 mm2 meter 110.00 90,321.00 9,935,310.00
- NYYHY 3 x 1,5 mm2 meter 110.00 39,050.55 4,295,560.50
- Kabel tray 30 x 40 Btg 1.00 4,803,217.65 4,803,217.65
5 Pekerjaan kabel ( Ruang Genset ) ###
- Kabel dari Cubicle PLN ke Cubicle User ###
- XLPE 3 x (1 x 70mm2) meter 20.00 786,324.00 15,726,480.00
- Kabel dari LVMDP ke Genset ###
- NYFGBY 4 x (4 x 300 mm2) meter 15.00 18,595,500.00 278,932,500.00
- Kabel dari Cubicle ke travo ###
- XLPE 3 x (1 x 70mm2) meter 10.00 786,324.00 7,863,240.00
- Kabel dari Travo ke LVMDP ###
- NYY 3 x (4 x 1 x 500 mm2) meter 15.00 6,101,593.91 91,523,908.65
- NYY 1 x (2 x 1 x 500 mm2) meter 15.00 4,601,058.00 69,015,870.00
6 Instalasi Pentanahan ###
- Grounding untuk Cubicle Netral PLN ###
- BC 35 mm2 meter 20.00 157,264.80 3,145,296.00
- Grounding rod 3/4 batang 4.00 3,910,368.00 15,641,472.00
- Grounding untuk Spare ###
- BC 35 mm2 meter 17.00 157,264.80 2,673,501.60
- Grounding rod 3/4 batang 4.00 3,910,368.00 15,641,472.00
- Grouding Netral Genset ###
- BC 35 mm2 meter 27.00 157,264.80 4,246,149.60
- Grounding rod 3/4 batang 4.00 3,910,368.00 15,641,472.00
- Grounding Netral Travo ###
- BC 35 mm2 meter 31.00 157,264.80 4,875,208.80
- Grounding rod 3/4 batang 4.00 3,910,368.00 15,641,472.00
- Grouding Panel (JB) ###
- BC 2 x 120 mm2 meter 51.00 1,049,848.80 53,542,288.80
- Grounding rod 3/4 batang 4.00 3,910,368.00 15,641,472.00
- Junction Box Grounding ke Genset, Travo ###
- BC 35 mm2 meter 30.00 157,264.80 4,717,944.00
- Grounding rod 3/4 batang 4.00 3,910,368.00 15,641,472.00
- Junction Box Grounding ke LVMDP ###
- BC 120 mm2 meter 20.00 524,924.40 10,498,488.00
- Grounding rod 3/4 batang 4.00 3,910,368.00 15,641,472.00
- Junction Box Grounding unit 1.00 4,450,965.75 4,450,965.75
7 Pekerjaan kabel-kabel di IPA ###
- Kabel dari Panel Distribusi ke Pompa Distribusi ###
- NYY 3 x (1 x 300mm2) meter 70.00 3,769,573.50 263,870,145.00
- BC 120 mm2 meter 70.00 524,924.40 36,744,708.00
- Kabel dari Panel Distribusi ke LVMDP ###
- NYFGBY 4 x 300 mm2 meter - 1,774,162.50 -
- BC 120 mm2 meter 20.00 524,924.40 10,498,488.00
- Kabel dari Panel Distribusi ke Hoist ###
- NYY 4 x 2,5 mm2 meter 10.00 90,321.00 903,210.00
Junction box untuk hoist unit 1.00 2,276,089.20 2,276,089.20
- Kabel dari Panel backwash ke LVMDP ###
-NYFGBY 4 x 95 mm meter 200.00 1,856,893.50 371,378,700.00
-NYFGBY 4 x 1.5 mm meter 10.00 269,369.10 2,693,691.00
- BC 35 mm2 meter - 157,264.80 -
- Kabel dari Panel Backwash ke Hoist ###
- NYY 4 x 2,5 mm2 meter 1.00 90,321.00 90,321.00
Junction box untuk hoist unit 1.00 2,276,089.20 2,276,089.20
- Kabel dari Panel Meja ke Panel Lokal Filter 1 ###
- NYYHY 6 x (4 x 1,5mm2) meter 50.00 269,369.10 13,468,455.00
- Kabel dari Panel Meja ke Panel Lokal Filter 2 ###
- NYYHY 6 x (4 x 1,5mm2) meter 45.00 269,369.10 12,121,609.50
- Kabel dari Panel Meja ke Panel Lokal Filter 3 ###
- NYYHY 6 x (4 x 1,5mm2) meter 45.00 269,369.10 12,121,609.50
- Kabel dari Panel Meja ke Panel Lokal Filter 4 ###
- NYYHY 6 x (4 x 1,5mm2) meter 40.00 269,369.10 10,774,764.00
- Kabel dari Panel Meja ke Panel Lokal Filter 5 ###
- NYYHY 6 x (4 x 1,5mm2) meter 40.00 269,369.10 10,774,764.00
- Kabel dari Panel Meja ke Panel Lokal Filter 6 ###
- NYYHY 6 x (4 x 1,5mm2) meter 35.00 269,369.10 9,427,918.50
Pipa GIP 3 x 3 inch meter 25.00 663,859.35 16,596,483.75
- Kabel dari Panel Lokal Filter 1 ke Limit switch Pneumatic Valve ###
- NYYHY 3 x 1,5 mm2 meter 50.00 39,050.55 1,952,527.50
- Kabel dari Panel Lokal Filter 2 ke Limit switch Pneumatic Valve ###
- NYYHY 3 x 1,5 mm2 meter 45.00 39,050.55 1,757,274.75
- Kabel dari Panel Lokal Filter 3 ke Limit switch Pneumatic Valve ###
- NYYHY 3 x 1,5 mm2 meter 40.00 39,050.55 1,562,022.00
- Kabel dari Panel Lokal Filter 4 ke Limit switch Pneumatic Valve ###
- NYYHY 3 x 1,5 mm2 meter 35.00 39,050.55 1,366,769.25
- Kabel dari Panel Lokal Filter 5 ke Limit switch Pneumatic Valve ###
- NYYHY 3 x 1,5 mm2 meter 33.00 39,050.55 1,288,668.15
- Kabel dari Panel Lokal Filter 6 ke Limit switch Pneumatic Valve ###
- NYYHY 3 x 1,5 mm2 meter 25.00 39,050.55 976,263.75
Jumlah 2,908,327,120.56

b Pengadaan dan Pemasangan Lampu Penerangan Luar


1 Dari panel PP-LR1
- Lampu LED 56W with aluminium housing, termasuk MCB d set 17.00 7,331,940.00 124,642,980.00
- Tiang lampu hot dip galvanis 6 m set 17.00 6,546,375.00 111,288,375.00
- Kabel NYFGbY 3 x 4 mm2 m 15.00 80,193.09 1,202,896.41
- Kabel NYFGbY 3 x 2,5 mm2 m 185.00 55,644.19 10,294,174.69
- Kabel NYFGbY 2 x 2,5 mm2 m 100.00 47,461.22 4,746,121.88
- GIP 2" m 6.00 366,597.00 2,199,582.00
2 Dari panel PP-LR2 ###
- Lampu LED 56W with aluminium housing, termasuk MCB d set 17.00 7,331,940.00 124,642,980.00
- Tiang lampu hot dip galvanis 6 m set 17.00 6,546,375.00 111,288,375.00
- Kabel NYFGbY 4 x 4 mm2 m 30.00 94,922.44 2,847,673.13
- Kabel NYFGbY 3 x 4 mm2 m 50.00 80,193.09 4,009,654.69
- Kabel NYFGbY 3 x 2,5 mm2 m 50.00 55,644.19 2,782,209.38
- Kabel NYFGbY 4 x 2,5 mm2 m 60.00 65,463.75 3,927,825.00
- Kabel NYFGbY 2 x 2,5 mm2 m 40.00 47,461.22 1,898,448.75
3 Dari panel PP-LR3 ###
- Lampu LED 56W with aluminium housing, termasuk MCB d set 17.00 7,331,940.00 124,642,980.00
- Kabel NYFGbY 3 x 2,5 mm2 m 150.00 55,644.19 8,346,628.13
- Kabel NYFGbY 4 x 4 mm2 m 50.00 94,922.44 4,746,121.88
- Kabel NYFGbY 2 x 2,5 mm2 m 220.00 47,461.22 10,441,468.13
- 5. GIP 2" m 6.00 366,597.00 2,199,582.00
Jumlah 656,148,076.03

c Pekerjaan Grounding Sistem, Listrik PLN, Uji Komisioning Sistem Elektrikal


1 Pengadaan dan pemasangan grounding system
Grounding system di seluruh IPA, komplit dengan box
- kontrol sesuai gambar termasuk grounding peralatan, LS 1.00 10,031,143.16 10,031,143.16
electronic dan instrumentasi
2 Penyambungan Listrik PLN
- Uji Komisioning Sistem Elektrikal LS 1.00 397,969,000.00 397,969,000.00
Jumlah 408,000,143.16

4 Pengadaan dan Pemasangan Instrumentasi dan Sistem Otomasi


1 IPA dan Pembubuh Kimia

Water level Sensor, Type Ultrasonik, Akurasi 0.2 % dari


- Range ukuran, Output 4 - 20 mA, support output to scada unit 6.00 21,787,590.00 130,725,540.00
system, instalasi to marshasling panel (backwash)

Chlorine Analyzer Free Reagent, output 4 - 20mA,


- support output to scada system, instalasi to marshasling unit 1.00 45,116,060.00 45,116,060.00
panel (backwash)

Residual Chlorine Analyzer, support output to scada


- system, instalasi to marshasling panel ( backwahs ) bisa unit 1.00 283,283,990.00 283,283,990.00
di aplikasikan di semua area pengolahan air

8 Core Singlemode Outdoor Direct Buried, Double Jacket


- m 250.00 17,325.00
9/125um 4,331,250.00
- Fibre optic splitter set 12.00 687,500.00 8,250,000.00
Patchcord Duplex Singlemode 9um/125um, 3 meter
- set 12.00 165,000.00 1,980,000.00
(LSZH)
- Network cable UTP Cat5 m 80.00 10,802.36 864,189.04
- Pigtail ST Singlemode, 1 meter set 10.00 18,150.00 181,500.00
8-port 10/100/1000 Managed Gigabit Switch with
- set 4.00 3,888,500.00 15,554,000.00
WebView
- Cable tray 200x50x2400x1.2mm dan penutup set 80.00 290,950.00 23,276,000.00
2 Reservoir IPA
Elektromagnetik Flowmeter dengan Akurasi 0.35 % dari
pembacaan, Output 4 - 20 mA, Bahasa komunikasi
- Hartcomm, Bahan Lining PFA, DN 300 with display, unit 3.00 41,150,560.00 123,451,680.00
flange type, support output to scada system, instalasi to
marshasling panel
Turbidity Analyzer Output 4 - 20 mA, Bahasa
- komunikasi Hartcomm, 0-10000 ntu, support output to unit 1.00 92,883,340.00 92,883,340.00
scada system, instalasi to marshasling panel

Digital pH Meter, Output 4 - 20 mA, Bahasa komunikasi


- Hartcomm, support output to scada system, instalasi to unit 1.00 17,108,300.00 17,108,300.00
marshasling panel

Pressure Transmitter dengan Akurasi 0.065 % dari span,


Output 4 - 20 mA, Bahasa komunikasi Hartcomm,
- unit 1.00 9,109,320.00 9,109,320.00
support output to scada system, instalasi to marshasling
panel

Water level Sensor, Tipe Ultrasonic, Akurasi 0.2 % dari


- Range ukur, Output 4 - 20 mA, support output to scada unit 2.00 20,903,850.00 41,807,700.00
system, instalasi to marshasling panel
Water level Sensor, Tipe Ultrasonic, Akurasi 0.2 % dari
- Range ukur, Output 4 - 20 mA, support output to scada unit 2.00 20,903,850.00 41,807,700.00
system, instalasi to marshasling panel
Chlorine Analyzer Free Reagent, output 4 - 20mA,
- support output to scada system, instalasi to marshasling unit 1.00 45,116,060.00 45,116,060.00
panel (backwash)

Residual Chlorine Analyzer, support output to scada


- system, instalasi to marshasling panel ( backwahs ) bisa unit 1.00 45,116,060.00 45,116,060.00
di aplikasikan di semua area pengolahan air

8 Core Singlemode Outdoor Direct Buried, Double Jacket


- m 250.00 17,325.00 4,331,250.00
9/125um

- Fibre optic splitter set 12.00 687,500.00 8,250,000.00

- Patchcord Duplex Singlemode 9um/125um, 3 meter (LSZH set 12.00 165,000.00 1,980,000.00
- Network cable UTP Cat5 m 80.00 10,802.36 864,189.04
- Pigtail ST Singlemode, 1 meter set 10.00 18,150.00 181,500.00
8-port 10/100/1000 Managed Gigabit Switch with
- set 4.00 3,888,500.00 15,554,000.00
WebView
- Cable tray 200x50x2400x1.2mm dan penutup set 80.00 290,950.00 23,276,000.00
3 Reservoir Distribusi
- Elektromagnetik Flowmeter dengan Akurasi 0.35 % dari pem unit 3.00 41,150,560.00 123,451,680.00
- Turbidity Analyzer Output 4 - 20 mA, Bahasa komunikasi Ha unit 1.00 92,883,340.00 92,883,340.00
- Digital pH Meter, Output 4 - 20 mA, Bahasa komunikasi Har unit 1.00 17,108,300.00 17,108,300.00
- Pressure Transmitter dengan Akurasi 0.065 % dari span, Ou unit 1.00 9,109,320.00 9,109,320.00
- Water level Sensor, Tipe Ultrasonic, Akurasi 0.2 % dari Ra unit 2.00 20,903,850.00 41,807,700.00
- Chlorine Analyzer Free Reagent, output 4 - 20mA, support o unit 1.00 45,116,060.00 45,116,060.00
- Residual Chlorine Analyzer, support output to scada system, unit 1.00 45,116,060.00 45,116,060.00
- GSM GPRS Communication Module and Interface, Quad Ba unit 2.00 6,270,000.00 12,540,000.00
- 8 Core Singlemode Outdoor Direct Buried, Double Jacket m 250.00 17,325.00 4,331,250.00
- Fibre optic splitter set 12.00 687,500.00 8,250,000.00
- Patchcord Duplex Singlemode 9um/125um, 3 meter (LSZH set 12.00 165,000.00 1,980,000.00
- Network cable UTP Cat5 m 80.00 10,802.36 864,189.04
- Pigtail ST Singlemode, 1 meter set 10.00 18,150.00 181,500.00
- 8-port 10/100/1000 Managed Gigabit Switch with WebVi set 4.00 3,888,500.00 15,554,000.00
- Cable tray 200x50x2400x1.2mm dan penutup set 80.00 290,950.00 23,276,000.00
- Elektromagnetik Flowmeter dengan Akurasi 0.35 % dari pem unit 1.00 510,400,000.00 510,400,000.00
4 Sistem Otomasi ###
Hardware support Redundancy system, meliputi Base
Modul, AI/AO, DI/DO sesuai system konfigurasi dan I/O,
- set 1.00 553,810,400.00 553,810,400.00
Server, Workstation, Comm Modem, Printer, Panel and
Marshalling cabinet dan accessories

Stardom Software media, HMI software and other


- set 1.00 363,466,400.00 363,466,400.00
support software, Auto Backup
Engineering dan Generation for FCX function, MMI
- Display and MMI Operator Utility Function (Estimate set 1.00 228,866,000.00 228,866,000.00
graphi Panel 10 pages)
- Pemasangan dan supporting material set 1.00 171,058,250.00 171,058,250.00
FAT, SAT, Uji komisioning Sistem Otomasi, gambar,
- set 1.00 455,466,000.00 455,466,000.00
buku manual OP, pelatihan operator
Jumlah 3,667,228,377.12
###
- PEKERJAAN PERALATAN KANTOR, LAB DAN WORKSHOP 285,194,705.40
1 Pengadaan AC dan APAR ###
- Air Condition Unit 2 PK Ruang Kendali Operasional unit 4.00 13,783,743.60 55,134,974.40
- Air Condition Unit 1 PK R. Kepala Kantor unit 1.00 6,831,303.60 6,831,303.60
- Air Condition Unit 1.5 PK unit 1.00 7,848,363.60 7,848,363.60
- Fire Extinguisher 6 kg (APAR) tipe ABC Chemical Dry at unit 3.00 6,579,315.60 19,737,946.80
- Fire Extinguisher 3 kg (APAR) tipe ABC Chemical Dry at unit 1.00 4,375,179.60 4,375,179.60
- Air Condition Unit 1 PK ex. Daikin u/ R.Staf unit 1.00 6,831,303.60 6,831,303.60
- Air Condition Unit 2 PK ex. Daikin u/ R.Lobby unit 1.00 13,783,743.60 13,783,743.60
- Air Condition Unit 3/4 PK ex. Daikin Class unit 2.00 6,482,163.60 12,964,327.20
Jumlah 127,507,142.40

3 Pengadaan dan Pemasangan Peralatan Laboratorium IPA


- PH Meter Printer unit 2.00 734,712.00 1,469,424.00
- Jar Test 6 Spindel dengan lampu tabung unit 2.00 3,673,560.00 7,347,120.00
- Spektrofotometer UV-VIS unit 1.00 2,755,170.00 2,755,170.00
- Timbangan Analitik (0,001) unit 1.00 3,122,526.00 3,122,526.00
- Konduktometer unit 1.00 1,469,424.00 1,469,424.00
- Pipet Tetes unit 5.00 367,356.00 1,836,780.00
- Beaker Glass unit 5.00 734,712.00 3,673,560.00
- Beaker Glass unit 10.00 1,102,068.00 11,020,680.00
- Gelas Ukur unit 3.00 367,356.00 1,102,068.00
- Tabung Reaksi unit 12.00 3,673,560.00 44,082,720.00
- Rak Tabung Reaksi unit 2.00 1,836,780.00 3,673,560.00
- Erlenmeyer unit 4.00 2,204,136.00 8,816,544.00
- Erlenmeyer unit 4.00 4,408,272.00 17,633,088.00
- Erlenmeyer unit 5.00 7,714,476.00 38,572,380.00
- Spatula unit 2.00 3,673,560.00 7,347,120.00
- Jas Laboratorium set 4.00 367,356.00 1,469,424.00
- Corong Imhof + rak isi 4 buah set 1.00 275,517.00 275,517.00
- Pipet Volume + karet penghisap set 4.00 413,275.50 1,653,102.00
- Stop watch unit 2.00 183,678.00 367,356.00
Jumlah 157,687,563.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6

PEKERJAAN PIPA DISTRIBUSI, DAN BANGUNAN PELENGKAP

I PEKERJAAN PERSIAPAN

1 Pengukuran dan Pematokan mtr 206,900.00 - -

2 Test pit ttk 60.00 - -

3 Penyediaan lokasi pembuangan hasil galian ls 1.00 - -

4 ls 1.00 - -
Pembersihan semua fasilitas sementara, Pemindahan
mesin/peralatan, material sisa dan sebagainya
JUMLAH I
-
II PEKERJAAN TANAH

Pek. Galian Tanah Biasa m3 35,750.00


1 59,587.20 2,130,242,400.00
Pek. Galian Tanah Berbatu/Cadas m3 72,300.00
2 89,380.80 6,462,231,840.00
Pek. Urugan Pilihan dipadatkan m3 124,026.50
3 27,000.00 3,348,715,500.00
Pek. Urugan kembali dipadatkan m3 19,989.00
4 20,250.00 404,777,250.00
Pek. Pemotongan Aspal m1 14,680.00
5 103,450.00 1,518,646,000.00
Pek. Urugan Pasir Dipadatkan m3 167,926.50
6 20,250.00 3,400,511,625.00
Pek. Urugan Agregat Klas A Dipadatkan m3 355,250.34
7 20,250.00 7,193,819,419.34
Pek. Urugan Agregat Klas B Dipadatkan m3 325,250.34
8 20,250.00 6,586,319,419.34
Sub Jumlah II Rp 31,045,263,453.69

III PEKERJAAN PENGADAAN PIPA DAN ACCESSORIES

Pengadaan Pipa

Pipa HDPE PE 250 mm, PN 10 Bar mtr 2,600.00 647,724.00


1 1,684,082,400.00
Pipa HDPE PE 200 mm, PN 10 Bar mtr 31,400.00 416,592.00
2 13,080,988,800.00
Pipa HDPE PE 160 mm, PN 10 Bar mtr 111,800.00 266,904.00
3 29,839,867,200.00
Pipa HDPE PE 110 mm, PN 10 Bar mtr 61,100.00 127,908.00
4 7,815,178,800.00

Pengadaan Accessories

Bend 90° HDPE OD 250 mm, PN 10 Bar bh 4.00 1,566,434.22


1 6,265,736.87
Bend 45° HDPE OD 250 mm, PN 10 Bar bh 34.00 1,141,000.00
2 38,794,000.00
Bend 90° HDPE OD 200 mm, PN 10 Bar bh 21.00 891,008.78
3 18,711,184.45
Bend 45° HDPE OD 200 mm, PN 10 Bar bh 209.00 585,600.00
4 122,390,400.00
Bend 90° HDPE OD 160 mm, PN 10 Bar bh 78.00 551,600.00
5 43,024,800.00
Bend 45° HDPE OD 160 mm, PN 10 Bar bh 575.00 348,400.00
6 200,330,000.00
Bend 90° HDPE OD 110 mm, PN 10 Bar bh 44.00 248,800.00
7 10,947,200.00
Bend 45° HDPE OD 110 mm, PN 10 Bar bh 324.00 175,700.00
8 56,926,800.00
Tee Equal DN 250 mm, PN 10 Bar bh 4.00 971,500.00
9 3,886,000.00
Tee Equal DN 200 mm, PN 10 Bar bh 21.00 675,100.00
10 14,177,100.00
Tee Equal DN 160 mm, PN 10 Bar bh 54.00 529,400.00
11 28,587,600.00
Tee Equal DN 110 mm, PN 10 Bar bh 44.00 344,100.00
12 15,140,400.00
Tee Reducer HDPE PE 250x100mm, PN 10 Bar bh 12.00 971,500.00
13 11,658,000.00
Tee Reducer HDPE PE 200x110 mm, PN 10 Bar bh 14.00 675,000.00
14 9,450,000.00
Tee Reducer HDPE PE 160x110 mm, PN 10 Bar bh 98.00 529,400.00
15 51,881,200.00
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6

Tee Reducer HDPE PE 160x100 mm, PN 10 Bar bh 45.00 529,400.00


16 23,823,000.00
Tee Reducer HDPE PE 110x110 mm, PN 10 Bar bh 32.00 344,100.00
17 11,011,200.00
Reducer HDPE PE 250x200 mm, PN 10 Bar bh 6.00 699,000.00
18 4,194,000.00
Reducer HDPE PE 250x160 mm, PN 10 Bar bh 12.00 685,134.00
19 8,221,608.00
Reducer HDPE PE 160x110 mm, PN 10 Bar bh 14.00 472,500.00
20 6,615,000.00
Stub End HDPE PE 250 mm, bh 40.00 833,900.00
21 33,356,000.00
Stub End HDPE PE 200 mm, bh 112.00 552,440.00
22 61,873,280.00
Stub End HDPE PE 160 mm, bh 184.00 324,375.00
23 59,685,000.00
Stub End HDPE PE 110 mm, bh 176.00 68,750.00
24 12,100,000.00
Backing Ring Steeel OD 250 mm bh 40.00 824,850.00
25 32,994,000.00
Backing Ring Steeel OD 200 mm bh 112.00 444,150.00
26 49,744,800.00
Backing Ring Steeel OD 160 mm bh 184.00 317,250.00
27 58,374,000.00
Backing Ring Steeel OD 110 mm bh 14.00 177,660.00
28 2,487,240.00
Gate Valve PN 16 DN 250 mm bh 20.00 12,495,000.00
29 249,900,000.00
Gate Valve PN 16 DN 200 mm bh 56.00 8,160,000.00
30 456,960,000.00
Gate Valve PN 16 DN 160 mm bh 92.00 5,995,000.00
31 551,540,000.00
Gate Valve PN 16 DN 110 mm bh 88.00 3,146,000.00
32 276,848,000.00
Check Valve DN 160 mm untuk pompa bh 10.00 28,327,000.00
33 283,270,000.00
Check Valve DN 110 mm bh 6.00 2,250,000.00
34 13,500,000.00
Air Valve + Gate Valve 2'' bh 18.00 177,660.00
35 3,197,880.00
Air Valve + Gate Valve 1/2'' bh 14.00 1,764,799.15
36 24,707,188.10
Clamp Sadle 160 mm x 3/4'' bh 2.00 39,500.00
37 79,000.00
Clamp Sadle 160 mm x 2'' bh 5.00 96,600.00
38 483,000.00

Sub Jumlah III Rp 55,277,251,817.42

IV PEKERJAAN PEMASANGAN PIPA , ACCESSORIES DAN PENGETESAN

Pemasangan Pipa

Pipa HDPE PE 250 mm, PN 10 Bar mtr 2,600.00 96,025.22


1 249,665,584.36
Pipa HDPE PE 200 mm, PN 10 Bar mtr 31,400.00 73,473.34
2 2,307,062,915.28
Pipa HDPE PE 160 mm, PN 10 Bar mtr 111,800.00 58,081.05
3 6,493,461,026.71
Pipa HDPE PE 110 mm, PN 10 Bar mtr 61,100.00 8,496.77
4 519,152,682.48
Pengetesan Pipa

Pipa HDPE PE 250 mm, PN 10 Bar mtr 2,600.00 3,267.37


1 8,495,151.79
Pipa HDPE PE 200 mm, PN 10 Bar mtr 31,400.00 3,002.43
2 94,276,257.14
Pipa HDPE PE 160 mm, PN 10 Bar mtr 111,800.00 2,832.87
3 316,714,706.29
Pipa HDPE PE 110 mm, PN 10 Bar mtr 61,100.00 2,673.91
4 163,375,660.96
Flushing Pipa

Pipa HDPE PE 250 mm, PN 10 Bar mtr 2,600.00 3,759.97


1 9,775,922.62
Pipa HDPE PE 200 mm, PN 10 Bar mtr 31,400.00 3,150.10
2 98,912,990.48
Pipa HDPE PE 160 mm, PN 10 Bar mtr 111,800.00 2,770.98
3 309,795,031.62
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6

Pipa HDPE PE 110 mm, PN 10 Bar mtr 61,100.00 2,213.05


4 135,217,369.55
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6

Pemasangan Accessories

Bend 90° HDPE OD 250 mm, PN 10 Bar bh 4.00 1,121,956.20


1 4,487,824.82
Bend 45° HDPE OD 250 mm, PN 10 Bar bh 34.00 1,121,956.20
2 38,146,510.94
Bend 90° HDPE OD 200 mm, PN 10 Bar bh 21.00 851,333.60
3 17,878,005.65
Bend 45° HDPE OD 200 mm, PN 10 Bar bh 209.00 851,333.60
4 177,928,722.86
Bend 90° HDPE OD 160 mm, PN 10 Bar bh 78.00 666,626.07
5 51,996,833.32
Bend 45° HDPE OD 160 mm, PN 10 Bar bh 575.00 666,626.07
6 383,309,989.20
Bend 90° HDPE OD 110 mm, PN 10 Bar bh 44.00 391,454.91
7 17,224,016.16
Bend 45° HDPE OD 110 mm, PN 10 Bar bh 324.00 391,454.91
8 126,831,391.74
Tee Equal DN 250 mm, PN 10 Bar bh 4.00 1,682,934.31
9 6,731,737.23
Tee Equal DN 200 mm, PN 10 Bar bh 21.00 1,277,000.40
10 26,817,008.47
Tee Equal DN 160 mm, PN 10 Bar bh 54.00 999,939.10
11 53,996,711.52
Tee Equal DN 110 mm, PN 10 Bar bh 44.00 587,182.37
12 25,836,024.24
Tee Reducer HDPE PE 250x75 mm, PN 10 Bar bh 12.00 1,282,600.44
13 15,391,205.25
Tee Reducer HDPE PE 200x110 mm, PN 10 Bar bh 14.00 1,047,061.06
14 14,658,854.82
Tee Reducer HDPE PE 160x110 mm, PN 10 Bar bh 98.00 862,353.52
15 84,510,645.41
Tee Reducer HDPE PE 160x75 mm, PN 10 Bar bh 45.00 827,270.30
16 37,227,163.56
Tee Reducer HDPE PE 110x75 mm, PN 10 Bar bh 32.00 552,099.15
17 17,667,172.67
Reducer HDPE PE 250x200 mm, PN 10 Bar bh 6.00 986,644.90
18 5,919,869.42
Reducer HDPE PE 250x160 mm, PN 10 Bar bh 12.00 894,291.14
19 10,731,493.63
Reducer HDPE PE 160x110 mm, PN 10 Bar bh 14.00 666,626.07
20 9,332,764.95
Stub End HDPE PE 250 mm, bh 40.00 560,978.10
21 22,439,124.08
Stub End HDPE PE 200 mm, bh 112.00 425,666.80
22 47,674,681.72
Stub End HDPE PE 160 mm, bh 184.00 333,313.03
23 61,329,598.27
Stub End HDPE PE 110 mm, bh 176.00 195,727.46
24 34,448,032.33
Backing Ring Steeel OD 250 mm bh 40.00 57,856.25
25 2,314,250.00
Backing Ring Steeel OD 200 mm bh 112.00 49,856.25
26 5,583,900.00
Backing Ring Steeel OD 160 mm bh 184.00 41,856.25
27 7,701,550.00
Backing Ring Steeel OD 110 mm bh 14.00 35,656.25
28 499,187.50
Gate Valve PN 16 DN 250 mm bh 20.00 116,880.00
29 2,337,600.00
Gate Valve PN 16 DN 200 mm bh 56.00 108,880.00
30 6,097,280.00
Gate Valve PN 16 DN 160 mm bh 92.00 100,880.00
31 9,280,960.00
Gate Valve PN 16 DN 110 mm bh 88.00 51,740.00
32 4,553,120.00
Check Valve DN 160 mm untuk pompa bh 10.00 108,880.00
33 1,088,800.00
Check Valve DN 110 mm bh 6.00 100,880.00
34 605,280.00
Air Valve + Gate Valve 2'' bh 18.00 705,919.66
35 12,706,553.88
Air Valve + Gate Valve 1/2'' bh 14.00 352,959.83
36 4,941,437.62
Clamp Sadle 160 mm x 3/4'' bh 2.00 35,348.00
37 70,696.00
Clamp Sadle 160 mm x 2'' bh 5.00 35,396.00
38 176,980.00

Sub Jumlah IV Rp 11,998,420,681.52


HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6

V PEKERJAAN BANGUNAN SIPIL 2,806,763,032.85

Box Gate Valve unit 129.80 1,384,918.89 179,756,101.46

Uraian pekerjaan per 1 unit bangunan :


1
Galian Tanah Biasa m3 0.200
2 35,750.00 7,150.00
Urugan Pasir m3 0.013
3 167,926.50 2,099.08
Pekerjaan Acian 1 : 2 m2 1.800
4 29,715.80 53,488.44
Beton Camp. 1smn : 3 psr : 5 krl m3 0.015
5 791,756.00 11,876.34
Beton Camp. 1smn : 11/2 psr : 2 1/2 krl m3 0.410
6 752,333.00 308,456.53
Baja Tulangan kg 61.500
7 11,101.50 682,742.25
Begisting m2 2.250
8 141,825.00 319,106.25
Sub Jumlah V Rp 1,384,918.89

Jembatan Pipa, Panjang = 24 m' Unit 15.00 175,133,795.43 2,627,006,931.39

Uraian pekerjaan per 1 unit bangunan :


1
Galian Tanah berbatu m3 96.21
2 72,300.00 6,955,886.75
Galian tanah biasa m3 96.21
3 35,750.00 3,439,459.91
Urugan tanah dipadatkan m3 96.21
4 19,989.00 1,923,115.08
Pasangan Batu Kali Camp. 1smn : 4 psr m3 15.00
5 580,189.00 8,702,835.00
Beton Cyclop m3 14.76
6 553,159.80 8,163,532.33
Beton Camp. 1smn : 11/2 psr : 2 1/2 krl m3 36.61
7 752,333.00 27,543,106.38
Baja Frofil kg 4,508.18
8 10,500.00 47,335,932.00
Pelat buhul / pengaku kg 557.06
9 10,500.00 5,849,141.76
Baja Tulangan kg 3,382.79
10 11,101.50 37,554,085.59
Begisting m2 155.80
11 141,825.00 22,096,249.91
Baut 3/4" bh 140.00
12 6,000.00 840,000.00
Pelat Klem pipa bh 25.00
13 16,909.00 422,725.00
Kayu kamper 6/12 cm m3 0.35
14 7,350,000.00 2,587,200.00
Cat Jembatan + Pipa m2 8.60 200,000.00
15 1,720,525.71
Sub Jumlah VI Rp 175,133,795.43

VI PEKERJAAN LAIN LAIN 51,161,531,617.07

Pasangan Batu Kali Camp. 1smn : 4 psr m³ 1,800.00


1 580,189.00 1,044,340,200.00
Beton Camp. 1smn : 3 psr : 5 krl m³ 500.00
2 791,756.00 395,878,000.00
Beton Camp. 1smn : 11/2 psr : 2 1/2 krl /Trush Block m³ 450.00
3 752,333.00 338,549,850.00
Pembuatan dan Pemasangan Pelindung Air valve Bh 243.00
4 150,000.00 36,450,000.00
Pembuatan dan Pemasangan Beton KS Bh 15.00
5 125,000.00 1,875,000.00
Pembuatan dan Pemasangan patok Ujung pipa Bh 1.00
6 100,000.00 100,000.00
Aspalt AC - WC t=4 cm m2 202,512.04
7 108,250.00 21,921,928,252.03
Aspalt AC - BC t=5 cm m2 253,140.05
8 108,250.00 27,402,410,315.04
Pembersihan Akhir Ls 1.00 20,000,000.00
9 20,000,000.00
Sub Jumlah VII Rp 51,161,531,617.07

SUB TOTAL 152,289,230,602.54


HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6

D PEKERJAAN PIPA PELAYANAN, DAN BANGUNAN PELENGKAP

I PEKERJAAN PERSIAPAN
1 Pengukuran dan Pematokan mtr 135,000.00 - -
2 Test pit ttk 25.00 - -
3 Penyediaan lokasi pembuangan hasil galian ls 1.00 - -

4 Pembersihan semua fasilitas sementara, Pemindahan ls 1.00 -


mesin/peralatan, material sisa dan sebagainya 0
JUMLAH I
-
II PEKERJAAN TANAH

1 Pek. Galian Tanah Biasa m3 38,880.00 35,750.00 1,389,960,000.00


2 Pek. Galian Tanah Berbatu/Cadas m3 58,320.00 72,300.00 4,216,536,000.00
3 Pek. Urugan Pilihan dipadatkan m3 27,000.00 124,026.50 3,348,715,500.00
4 Pek. Urugan kembali dipadatkan m3 20,250.00 19,989.00 404,777,250.00
5 Pek. Pemotongan Aspal m1 67,500.00 14,680.00 990,900,000.00
6 Pek. Urugan Pasir Dipadatkan m3 20,250.00 167,926.50 3,400,511,625.00
7 Pek. Urugan Agregat Klas A Dipadatkan m3 20,250.00 355,250.34 7,193,819,419.34
8 Pek. Urugan Agregat Klas B Dipadatkan m3 20,250.00 325,250.34 6,586,319,419.34
Sub Jumlah II Rp 27,531,539,213.69

III PEKERJAAN PENGADAAN PIPA DAN ACCESSORIES

Pengadaan Pipa

1 Pipa HDPE PE 160 mm, PN 10 Bar mtr 81,900.00 266,904.00 21,859,437,600.00


2 Pipa HDPE PE 110 mm, PN 10 Bar mtr 53,100.00 127,908.00 6,791,914,800.00

Pengadaan Accessories
1 Bend 90° HDPE OD 160 mm, PN 10 Bar bh 54.00 551,600.00 29,786,400.00
2 Bend 45° HDPE OD 160 mm, PN 10 Bar bh 409.00 348,400.00 142,495,600.00
3 Bend 90° HDPE OD 110 mm, PN 10 Bar bh 36.00 248,800.00 8,956,800.00
4 Bend 45° HDPE OD 110 mm, PN 10 Bar bh 265.00 175,700.00 46,560,500.00
5 Tee Equal DN 160 mm, PN 10 Bar bh 30.00 529,400.00 15,882,000.00
6 Tee Equal DN 110 mm, PN 10 Bar bh 21.00 344,100.00 7,226,100.00
7 Tee Reducer HDPE PE 160x110 mm, PN 10 Bar bh 60.00 529,400.00 31,764,000.00
8 Tee Reducer HDPE PE 160x100 mm, PN 10 Bar bh 30.00 529,400.00 15,882,000.00
9 Tee Reducer HDPE PE 110x110 mm, PN 10 Bar bh 25.00 344,100.00 8,602,500.00
10 Reducer HDPE PE 160x110 mm, PN 10 Bar bh 12.00 472,500.00 5,670,000.00
11 Stub End HDPE PE 160 mm, bh 126.00 324,375.00 40,871,250.00
12 Stub End HDPE PE 110 mm, bh 108.00 68,750.00 7,425,000.00
13 Backing Ring Steeel OD 160 mm bh 126.00 317,250.00 39,973,500.00
14 Backing Ring Steeel OD 110 mm bh 108.00 177,660.00 19,187,280.00
15 Gate Valve PN 16 DN 160 mm bh 63.00 5,995,000.00 377,685,000.00
16 Gate Valve PN 16 DN 110 mm bh 54.00 3,146,000.00 169,884,000.00
17 Check Valve DN 160 mm untuk pompa bh 10.00 28,327,000.00 283,270,000.00
18 Check Valve DN 110 mm bh 7.00 2,250,000.00 15,750,000.00
19 Air Valve + Gate Valve 2'' bh 20.00 177,660.00 3,553,200.00
20 Air Valve + Gate Valve 1/2'' bh 15.00 1,764,799.15 26,471,987.25
21 Clamp Sadle 160 mm x 3/4'' bh 20.00 39,500.00 790,000.00
22 Clamp Sadle 160 mm x 2'' bh 15.00 96,600.00 1,449,000.00

Sub Jumlah III Rp 29,950,488,517.25

IV PEKERJAAN PEMASANGAN PIPA , ACCESSORIES DAN PENGETESAN

Pemasangan Pipa
1 Pipa HDPE PE 160 mm, PN 10 Bar mtr 81,900.00 58,081.05 4,756,837,728.87
2 Pipa HDPE PE 110 mm, PN 10 Bar mtr 53,100.00 8,496.77 451,178,517.83
Pengetesan Pipa
1 Pipa HDPE PE 160 mm, PN 10 Bar mtr 81,900.00 2,832.87 232,011,936.00
2 Pipa HDPE PE 110 mm, PN 10 Bar mtr 53,100.00 2,673.91 141,984,412.39
Flushing Pipa
1 Pipa HDPE PE 160 mm, PN 10 Bar mtr 81,900.00 2,770.98 226,942,872.00
2 Pipa HDPE PE 110 mm, PN 10 Bar mtr 53,100.00 2,213.05 117,512,967.64
Pemasangan Accessories
1 Bend 90° HDPE OD 160 mm, PN 10 Bar bh 54.00 666,626.07 35,997,807.68
2 Bend 45° HDPE OD 160 mm, PN 10 Bar bh 409.00 666,626.07 272,650,061.88
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
3 Bend 90° HDPE OD 110 mm, PN 10 Bar bh 36.00 391,454.91 14,092,376.86
4 Bend 45° HDPE OD 110 mm, PN 10 Bar bh 265.00 391,454.91 103,735,551.89
5 Tee Equal DN 160 mm, PN 10 Bar bh 30.00 999,939.10 29,998,173.07
HARGA SATUAN JUMLAH
NO URAIAN PEKER JAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
6 Tee Equal DN 110 mm, PN 10 Bar bh 21.00 587,182.37 12,330,829.75
7 Tee Reducer HDPE PE 160x110 mm, PN 10 Bar bh 60.00 862,353.52 51,741,211.47
8 Tee Reducer HDPE PE 160x75 mm, PN 10 Bar bh 30.00 827,270.30 24,818,109.04
9 Tee Reducer HDPE PE 110x75 mm, PN 10 Bar bh 25.00 552,099.15 13,802,478.65
10 Reducer HDPE PE 160x110 mm, PN 10 Bar bh 12.00 666,626.07 7,999,512.82
11 Stub End HDPE PE 160 mm, bh 126.00 333,313.03 41,997,442.29
12 Stub End HDPE PE 110 mm, bh 108.00 195,727.46 21,138,565.29
13 Backing Ring Steeel OD 160 mm bh 126.00 41,856.25 5,273,887.50
14 Backing Ring Steeel OD 110 mm bh 108.00 35,656.25 3,850,875.00
15 Gate Valve PN 16 DN 160 mm bh 63.00 100,880.00 6,355,440.00
16 Gate Valve PN 16 DN 110 mm bh 54.00 51,740.00 2,793,960.00
17 Check Valve DN 160 mm untuk pompa bh 10.00 108,880.00 1,088,800.00
18 Check Valve DN 110 mm bh 7.00 100,880.00 706,160.00
19 Air Valve + Gate Valve 2'' bh 20.00 705,919.66 14,118,393.20
20 Air Valve + Gate Valve 1/2'' bh 15.00 352,959.83 5,294,397.45
21 Clamp Sadle 160 mm x 3/4'' bh 20.00 35,348.00 706,960.00
22 Clamp Sadle 160 mm x 2'' bh 15.00 35,396.00 530,940.00

Sub Jumlah IV Rp 6,597,490,368.58

V PEKERJAAN BANGUNAN SIPIL 3,314,443,827.95

Box Gate Valve unit 117.00 1,384,918.89 162,035,510.28


1 Uraian pekerjaan per 1 unit bangunan :
2 Galian Tanah Biasa m3 0.200 35,750.00 7,150.00
3 Urugan Pasir m3 0.013 167,926.50 2,099.08
4 Pekerjaan Acian 1 : 2 m2 1.800 29,715.80 53,488.44
5 Beton Camp. 1smn : 3 psr : 5 krl m3 0.015 791,756.00 11,876.34
6 Beton Camp. 1smn : 11/2 psr : 2 1/2 krl m3 0.410 752,333.00 308,456.53
7 Baja Tulangan kg 61.500 11,101.50 682,742.25
8 Begisting m2 2.250 141,825.00 319,106.25
Sub Jumlah V Rp 1,384,918.89

VI Jembatan Pipa, Panjang = 24 m' Unit 18.00 175,133,795.43 3,152,408,317.67

1 Uraian pekerjaan per 1 unit bangunan :


2 Galian Tanah berbatu m3 96.21 72,300.00 6,955,886.75
3 Galian tanah biasa m3 96.21 35,750.00 3,439,459.91
4 Urugan tanah dipadatkan m3 96.21 19,989.00 1,923,115.08
5 Pasangan Batu Kali Camp. 1smn : 4 psr m3 15.00 580,189.00 8,702,835.00
6 Beton Cyclop m3 14.76 553,159.80 8,163,532.33
7 Beton Camp. 1smn : 11/2 psr : 2 1/2 krl m3 36.61 752,333.00 27,543,106.38
8 Baja Frofil kg 4,508.18 10,500.00 47,335,932.00
9 Pelat buhul / pengaku kg 557.06 10,500.00 5,849,141.76
10 Baja Tulangan kg 3,382.79 11,101.50 37,554,085.59
11 Begisting m2 155.80 141,825.00 22,096,249.91
12 Baut 3/4" bh 140.00 6,000.00 840,000.00
13 Pelat Klem pipa bh 25.00 16,909.00 422,725.00
14 Kayu kamper 6/12 cm m3 0.35 7,350,000.00 2,587,200.00
15 Cat Jembatan + Pipa m2 8.60 200,000.00 1,720,525.71
Sub Jumlah VI Rp 175,133,795.43

VII PEKERJAAN LAIN LAIN

1 Pasangan Batu Kali Camp. 1smn : 4 psr m³ 1,500.00 580,189.00 870,283,500.00


2 Beton Camp. 1smn : 3 psr : 5 krl m³ 500.00 791,756.00 395,878,000.00
3 Beton Camp. 1smn : 11/2 psr : 2 1/2 krl /Trush Block m³ 450.00 752,333.00 338,549,850.00
4 Pembuatan dan Pemasangan Pelindung Air valve Bh 243.00 150,000.00 36,450,000.00
5 Pembuatan dan Pemasangan Beton KS Bh 15.00 125,000.00 1,875,000.00
6 Pembuatan dan Pemasangan patok Ujung pipa Bh 1.00 100,000.00 100,000.00
7 Aspalt AC - WC t=4 cm m2 67,500.00 202,512.04 13,669,562,651.38
8 Aspalt AC - BC t=5 cm m2 67,500.00 253,140.05 17,086,953,314.23
9 Pembersihan Akhir Ls 1.00 20,000,000.00 20,000,000.00
Sub Jumlah VII Rp 32,419,652,315.61

SUB TOTAL 99,813,614,243.07