REKAPITULASI

ENGINEER ESTIMATE (EE)


PEKERJAAN : PERSIAPAN DAN STRUKTUR
PROYEK : PEMBANGUNAN GEDUNG REKTORAT DAN RUANG KULIAH KAMPUS PEPI
LOKASI : KABUPATEN TANGERANG, BANTEN
TAHUN : 2019
Sub Jumlah Harga Jumlah Harga (
No. Uraian Pekerjaan
( Rp. ) Rp. )

I. PEKERJAAN PERSIAPAN - -

II. PEKERJAAN GEDUNG REKTORAT -

1 PEKERJAAN STRUKTUR -

III. PEKERJAAN GWT DAN POWER HOUSE -

1 PEKERJAAN STRUKTUR -

JUMLAH (I + II + III) -
PPN 10 % -
JUMLAH HARGA -
DIBULATKAN -

..................., ..................................
PENAWAR
CV./PT. ................................................

......................................
JABATAN

Page 1 of 23
ENGINEER ESTIMATE (EE)
PEKERJAAN : PERSIAPAN
PROYEK : PEMBANGUNAN GEDUNG REKTORAT DAN RUANG KULIAH KAMPUS PEPI
LOKASI : KABUPATEN TANGERANG, BANTEN
TAHUN : 2019
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN SAT VOLUME
(Rp.) (Rp.)

A. PEKERJAAN PERSIAPAN UMUM

1 Gambar Terlaksana (Gambar Kerja Yang Dilaksanakan) set 1,00 - -

Pembuatan gambar - gambar terlaksana termasuk


penyimpangan - penyimpangan baik itu atas perintah Pemberi
Tugas atau tidak, dan sesuai apa yang telah dilaksanakan ( as
built drawings ), yang jelas memperlihatkan perbedaan antara
Gambar - gambar Kontrak dan gambar terlaksana.

2 Pemeriksaan dan Pengujian Bahan ls 1,00 - -

Dalam pengajuan penawarannya, Pemborong sudah harus


memasukan segala keperluan biaya - biaya pengujian berbagai
bahan dan pekerjaan. Jumlah biaya yang dicantumkan adalah
menjadi tanggung jawab dan resiko Pemborong.

3 Kebersihan dan Kerapihan ls 3,00 - -

Pemborong harus mengankut semua sampah secara teratur


ketempat - tempat yang telah ditunjuk MK. dan Pemborong
Utama berkewajiban secara teratur membuang keluar lokasi
yang ditunjuk oleh Pemerintah dan pada waktu penyelesaian
pekerjaan harus rapih dan bersih.
4 Kesehatan Dan Keselamatan Kerja (K3)

Kebersihan dan Kerapihan, P3K dan Pemadam Kebakaran, Ls 1,00 - -


Pengamanan Proyek Dan Perlindungan Pekerjaan Termasuk
Alat Dan Kelengkapan K3.

5 Pengadaan Sumber Air Bersih dan MCK ..................., ..................................


PENAWAR
a. CV./PT. ................................................ - -
Pengadaan sumber air bersih dan alat pendukungnya untuk
keperluan pelaksanaan pekerjaan dan sebagai fasilitas pekerja.

b. unit 2,00 - -
Pengadaan fasilitas MCK sesuai dengan keperluan tenaga kerja
yang penempatannya dikordinasikan dengan MK.

6 Pengadaan Listrik bln 3,00 - -

......................................
Pengadaan penerangan sementara / buatan yang dipergunakan
oleh Pemborong untuk penerangan dalam bekerja termasuk
pemindahan & perijinan meteran PLN (bila digunakan) dengan
kordinasi MK.
JABATAN
7 Peralatan dan Perlengkapan Kerja

a. Pondasi Tower Crane unit 1,00 - -


b. Sewa Mobil Crane Kap. 3 Ton bln 3,00 - -

Page 2 of 23
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN SAT VOLUME
(Rp.) (Rp.)
8 Laporan
bln 3,00 - -
Pemborong wajib membuat laporan harian, mingguan, bulanan ,
laporan progres dan laporan lainnya Termasuk photo - photo
berwarna atas kemajuan pekerjaan dan diserahkan pada MK.
Setiap bulan hingga masa penyerahan pertama sesuai dengan
keperluan obyek pekerjaan.

9 Kantor Pemborong dan MK dilapangan m2 60,00 - -


Sewa kantor sementara Pemborong dilapangan beserta fasilitas
- fasilitasnya.

10 Gudang dan Los Kerja m2 48,00 - -

Sewa gudang dan los kerja sementara dilapangan serta


membongkar setelah pekerjaan dilapangan selesai

11 Saluran Sementara ls 1,00 - -


Saluran sementara di proyek untuk mencegah genangan air dan
mengalirkan ketempat yang aman, yang tidak mengganggu
aktifitas pekerjaan di lapangan.

12 Pagar sementara
m' 200,00 - -
Sewa pagar sementara proyek berikut pintu-pintu dari zincalum
t = 0.25 mm termasuk rangka kaso dan dicat bagian luarnya,
serta membongkar setelah tidak diperlukan

13 Papan nama proyek bh 1,00 - -


Kontraktor harus membuat papan nama yang menunjukan
nama proyek dan terbuat dari multiplek rangka kayu dicat dan
dipasang ditempat yang mudah terlihat.

14 Jalan Sementara Masuk Proyek (4.00 x 125.00 m') m2 250,00 - -

Kontraktor diwajibkan membuat pekerjaan jalan sementara


untuk memudahkan dalam proses pelaksanaan pekerjaan
(batu belah 0,15 cm + bt.pecah 0,09 cm + ps pasang 0,01 cm)

15 Steger Kerja m2 2.349,00 - -


Kontraktor diwajibkan memasang steger kerja keliling bangunan
keperluan pekerjaan finishing bagian luar dan membongkarnya
kembali setelah pekerjaan selesai.(Sewa)

16 Asuransi
Pekerjaan dan tenaga manusia harus diasuransikan terdiri (
ls 1,00 - -
CAR dan ASTEK ).

TOTAL PERKERJAAN PERSIAPAN -

Page 3 of 23
REKAPITULASI
ENGINEERING ESTIMATE (EE)
PEKERJAAN : STRUKTUR
PROYEK : PEMBANGUNAN GEDUNG REKTORAT DAN RUANG KULIAH KAMPUS PEPI
LOKASI : KABUPATEN TANGERANG, BANTEN
TAHUN : 2019
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan
( Rp. ) ( Rp. )

II. PEKERJAAN STRUKTUR


II.1 PEKERJAN PONDASI TIANG PANCANG -
Pekerjaan Tiang Pancang -
Pekerjaan Galian Dan Urugan -

II.2 PEKERJAAN SUB STRUKTUR : -


Pekerjaan Pile Cap -
Pekerjaan Tie Beam / Sloof -
Pekerjaan Plat Lantai 1 (EL. - 1.850 ~ - 0.050) -
Pekerjaan Dinding Pit Lift -

II.3 PEKERJAAN UPER STRUKTUR :


A. STRUKTUR LANTAI 2 -
Pekerjaan Kolom EL. - 1.050 -
Pekerjaan Shearwall -
Pekerjaan Balok EL. + 4.950 -
Pekerjaan Plat EL. + 4.950 -
Pekerjaan Tangga ..................., .................................. -
B STRUKTUR LANTAI 3 PENAWAR -
Pekerjaan Kolom EL. + 4.950 CV./PT. ................................................ -
Pekerjaan Shearwall + 4.950 -
Pekerjaan Balok EL. + 9.200 -
Pekerjaan Plat EL. + 9.200 -
Pekerjaan Tangga -
C STRUKTUR LANTAI 4 ...................................... -
Pekerjaan Kolom EL. + 9.200 JABATAN -
Pekerjaan ShearWall + 9.200 -
Pekerjaan Balok EL. + 13.450 -
Pekerjaan Plat EL. + 13.450 -
Pekerjaan Tangga -
Pekerjaan Atap Baja -

JUMLAH HARGA PEKERJAAN STRUKTUR GEDUNG REKTORAT -

Page 4 of 23
ENGINEERING ESTIMATE (EE)
PEKERJAAN : STRUKTUR
PROYEK : PEMBANGUNAN GEDUNG REKTORAT DAN RUANG KULIAH KAMPUS PEPI
LOKASI : KABUPATEN TANGERANG, BANTEN
TAHUN : 2019
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Volume
( Rp. ) ( Rp. )

II. PEKERJAAN STRUKTUR


II.1 PEKERJAN PONDASI TIANG PANCANG
A.1 Pekerjaan Tiang Pancang
1 Pasang Bouwplank / Uitset m' 218,00 - -
2 Mobilisasi & demobilisasi peralatan Pancang ls include -
3 Penentuan titik tiang pancang ttk 227,00 - -
4 Pengadaan Tiang pancang square pile 50x50 cm (12+13 m) m' 5.675,00 - -
5 Pemancangan + Handling m' 5.675,00 - -
6 Joint Pile bh 227,00 - -
7 Pemotongan Tiang Pancang termasuk buang puing keluar proyek m3 56,75 - -
Mobilisasi & demobilisasi peralatan Load Test ls include -
8 Tes Aksial 200% x 120 Ton =240 ton ttk 2,00 - -
9 Tes Lateral 200% x 4 Ton = 8 ton ttk 1,00 - -
10 PDA Test ttk 3,00 - -
Jumlah Pekerjaan Pondasi -

II.2 PEKERJAAN TANAH :


B. Pekerjaan Galian Dan Urugan
B.1 Pengurugan Lahan EL
1 Urugan Tanah Dari Galian GWT & Power House m3 1.045,20 - -
B.2 Pilecap type PC-1 EL. - 1.850 - -
1 Galian Tanah m3 8,40 - -
2 Urugan Tanah Kembali Bekas Galian m3 5,55 - -
3 Buangan Tanah Bekas Galian Dalam Lokasi Proyek m3 2,85 - -
4 Urugan Pasir Pasang Tebal 10 cm m3 0,30 - -
B.3 Pilecap type PC-2 EL. - 1.050 - -
1 Galian Tanah m3 25,65 - -
2 Urugan Tanah Kembali Bekas Galian m3 - - -
3 Buangan Tanah Bekas Galian Dalam Lokasi Proyek m3 25,65 - -
4 Urugan Pasir Pasang Tebal 10 cm m3 2,70 - -
B.4 Pilecap type PC-3 EL. - 1.050 - -
1 Galian Tanah m3 8,27 - -
2 Urugan Tanah Kembali Bekas Galian m3 3,94 - -
3 Buangan Tanah Bekas Galian Dalam Lokasi Proyek m3 4,32 - -
4 Urugan Pasir Pasang Tebal 10 cm m3 0,37 - -
B.5 Pilecap type PC-3A EL. - 1.850 - -
1 Galian Tanah m3 10,50 - -
2 Urugan Tanah Kembali Bekas Galian m3 6,47 - -
3 Buangan Tanah Bekas Galian Dalam Lokasi Proyek m3 4,02 - -
4 Urugan Pasir Pasang Tebal 10 cm m3 0,35 - -
B.6 Pilecap type PC-4 EL. - 1.050 - -
1 Galian Tanah m3 22,27 - -
2 Urugan Tanah Kembali Bekas Galian m3 10,63 - -
3 Buangan Tanah Bekas Galian Dalam Lokasi Proyek m3 11,64 - -
4 Urugan Pasir Pasang Tebal 10 cm m3 1,01 - -
B.7 Pilecap type PC-5 EL. - 1.050 - -
1 Galian Tanah m3 34,18 - -
2 Urugan Tanah Kembali Bekas Galian m3 14,95 - -
3 Buangan Tanah Bekas Galian Dalam Lokasi Proyek m3 19,22 - -
4 Urugan Pasir Pasang Tebal 10 cm m3 1,42 - -
B.8 Pilecap type PC-6 EL. - 1.050 - -
1 Galian Tanah m3 75,60 - -
2 Urugan Tanah Kembali Bekas Galian m3 33,07 - -
3 Buangan Tanah Bekas Galian Dalam Lokasi Proyek m3 42,52 - -
4 Urugan Pasir Pasang Tebal 10 cm m3 3,15 - -
B.9 Pilecap type PC-7 EL. - 1.050 - -
1 Galian Tanah m3 82,15 - -
2 Urugan Tanah Kembali Bekas Galian m3 35,94 - -
3 Buangan Tanah Bekas Galian Dalam Lokasi Proyek m3 46,21 - -
4 Urugan Pasir Pasang Tebal 10 cm m3 3,42 - -

Page 5 of 23
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Volume
( Rp. ) ( Rp. )
B.10 Pilecap type PC-17 EL. - 1.050 - -
1 Galian Tanah m3 119,32 - -
2 Urugan Tanah Kembali Bekas Galian m3 48,18 - -
3 Buangan Tanah Bekas Galian Dalam Lokasi Proyek m3 71,13 - -
4 Urugan Pasir Pasang Tebal 10 cm m3 4,58 - -
B.11 Pilecap type PC-17 EL. - 1.850 - -
1 Galian Tanah m3 156,03 - -
2 Urugan Tanah Kembali Bekas Galian m3 84,90 - -
3 Buangan Tanah Bekas Galian Dalam Lokasi Proyek m3 71,13 - -
4 Urugan Pasir Pasang Tebal 10 cm m3 4,58 - -
B.12 Pilecap type PC-28 EL. - 1.050 - -
1 Galian Tanah m3 100,47 - -
2 Urugan Tanah Kembali Bekas Galian m3 40,57 - -
3 Buangan Tanah Bekas Galian Dalam Lokasi Proyek m3 59,89 - -
4 Urugan Pasir Pasang Tebal 10 cm m3 3,86 - -
B.13 Pilecap type PC-28 EL. - 1.850 - -
1 Galian Tanah m3 131,38 - -
2 Urugan Tanah Kembali Bekas Galian m3 71,48 - -
3 Buangan Tanah Bekas Galian Dalam Lokasi Proyek m3 59,89 - -
4 Urugan Pasir Pasang Tebal 10 cm m3 3,86 - -
B.11 Tie Beam/ Sloof type TB-1 EL. - 0.050 - -
1 Galian Tanah m3 74,35 - -
2 Urugan Tanah Kembali Bekas Galian m3 - - -
3 Buangan Tanah Bekas Galian Dalam Lokasi Proyek m3 74,35 - -
4 Urugan Pasir Pasang Tebal 10 cm m3 8,60 - -
B.12 Tie Beam/ Sloof type TB-1 EL. - 1.050 - -
1 Galian Tanah m3 38,08 - -
2 Urugan Tanah Kembali Bekas Galian m3 - - -
3 Buangan Tanah Bekas Galian Dalam Lokasi Proyek m3 38,08 - -
4 Urugan Pasir Pasang Tebal 10 cm m3 5,04 - -
B.13 Tie Beam/ Sloof type TB-1 EL. - 1.850 - -
1 Galian Tanah m3 14,86 - -
2 Urugan Tanah Kembali Bekas Galian m3 10,18 - -
3 Buangan Tanah Bekas Galian Dalam Lokasi Proyek m3 4,67 - -
4 Urugan Pasir Pasang Tebal 10 cm m3 0,55 - -
B.14 Tie Beam/ Sloof type TB-2 EL. - 0.050 - -
1 Galian Tanah m3 36,32 - -
2 Urugan Tanah Kembali Bekas Galian m3 - - -
3 Buangan Tanah Bekas Galian Dalam Lokasi Proyek m3 36,32 - -
4 Urugan Pasir Pasang Tebal 10 cm m3 5,03 - -
B.15 Tie Beam/ Sloof type TB-2 EL. - 1.050 - -
1 Galian Tanah m3 35,01 - -
2 Urugan Tanah Kembali Bekas Galian m3 - - -
3 Buangan Tanah Bekas Galian Dalam Lokasi Proyek m3 35,01 - -
4 Urugan Pasir Pasang Tebal 10 cm m3 4,93 - -
B.16 Tie Beam/ Sloof type TB-2 EL. - 1.850 - -
1 Galian Tanah m3 1,90 - -
2 Urugan Tanah Kembali Bekas Galian m3 1,35 - -
3 Buangan Tanah Bekas Galian Dalam Lokasi Proyek m3 0,54 - -
4 Urugan Pasir Pasang Tebal 10 cm m3 0,07 - -
B.17 Pelat Lantai type S EL. - 0.050 - -
1 Galian Tanah m3 234,84 - -
2 Urugan Tanah Kembali Bekas Galian m3 - - -
3 Buangan Tanah Bekas Galian Dalam Lokasi Proyek m3 234,84 - -
4 Urugan Pasir Pasang Tebal 10 cm m3 78,28 - -
B.18 Pelat Lantai type S EL. - 1.050 - -
1 Galian Tanah m3 87,19 - -
2 Urugan Tanah Kembali Bekas Galian m3 - - -
3 Buangan Tanah Bekas Galian Dalam Lokasi Proyek m3 87,19 - -
4 Urugan Pasir Pasang Tebal 10 cm m3 29,06 - -
B.19 Pelat Lantai type Pitlift EL. - 1.850 - -
1 Galian Tanah m3 71,31 - -
2 Urugan Tanah Kembali Bekas Galian m3 - - -
3 Buangan Tanah Bekas Galian Dalam Lokasi Proyek m3 71,31 - -
4 Urugan Pasir Pasang Tebal 10 cm m3 2,59 - -
B.20 Anti Rayap m2 2.000,00 - -

Jumlah Pekerjaan Tanah -


Jumlah Pekerjaan Pondasi -

Page 6 of 23
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Volume
( Rp. ) ( Rp. )
II.3 PEKERJAAN SUB STRUKTUR :
C. Pekerjaan Pile Cap
C.1 Pilecap type PC-1 EL. - 1.850
1 Beton lantai kerja 1PC:3Psr:5Krl m3 0,15 - -
2 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 2,40 - -
3 Pembesian BJTP U-24 & BJTD U-40 kg 531,56 - -
4 Bekisting Kayu m2 6,60 - -
C.2 Pilecap type PC-2 EL. - 1.050 - -
1 Beton lantai kerja 1PC:3Psr:5Krl m3 1,35 - -
2 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 21,60 - -
3 Pembesian BJTP U-24 & BJTD U-40 kg 3.931,03 - -
4 Bekisting Kayu m2 48,20 - -
C.3 Pilecap type PC-3 EL. - 1.050 - -
1 Beton lantai kerja 1PC:3Psr:5Krl m3 0,18 - -
2 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 3,76 - -
3 Pembesian BJTP U-24 & BJTD U-40 kg 730,80 - -
4 Bekisting Kayu m2 7,59 - -
C.4 Pilecap type PC-3A EL. - 1.850 - -
1 Beton lantai kerja 1PC:3Psr:5Krl m3 0,17 - -
2 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 3,50 - -
3 Pembesian BJTP U-24 & BJTD U-40 kg 705,44 - -
4 Bekisting Kayu m2 7,99 - -
C.5 Pilecap type PC-4 EL. - 1.050 - -
1 Beton lantai kerja 1PC:3Psr:5Krl m3 0,50 - -
2 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 10,12 - -
3 Pembesian BJTP U-24 & BJTD U-40 kg 1.755,83 - -
4 Bekisting Kayu m2 18,00 - -
C.6 Pilecap type PC-5 EL. - 1.050 - -
1 Beton lantai kerja 1PC:3Psr:5Krl m3 0,71 - -
2 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 17,09 - -
3 Pembesian BJTP U-24 & BJTD U-40 kg 2.698,53 - -
4 Bekisting Kayu m2 25,99 - -
C.7 Pilecap type PC-6 EL. - 1.050 - -
1 Beton lantai kerja 1PC:3Psr:5Krl m3 1,57 - -
2 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 37,80 - -
3 Pembesian BJTP U-24 & BJTD U-40 kg 5.831,68 - -
4 Bekisting Kayu m2 55,20 - -
C.8 Pilecap type PC-7 EL. - 1.050 - -
1 Beton lantai kerja 1PC:3Psr:5Krl m3 1,71 - -
2 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 41,08 - -
3 Pembesian BJTP U-24 & BJTD U-40 kg 6.477,42 - -
4 Bekisting Kayu m2 58,91 - -
C.9 Pilecap type PC-17 EL. - 1.050 - -
1 Beton lantai kerja 1PC:3Psr:5Krl m3 2,29 - -
2 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 64,25 - -
3 Pembesian BJTP U-24 & BJTD U-40 kg 8.912,52 - -
4 Bekisting Kayu m2 57,49 - -
C.10 Pilecap type PC-17 EL. - 1.850 - -
1 Beton lantai kerja 1PC:3Psr:5Krl m3 2,29 - -
2 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 64,25 - -
3 Pembesian BJTP U-24 & BJTD U-40 kg 8.912,52 - -
4 Bekisting Kayu m2 55,29 - -
C.11 Pilecap type PC-28 EL. - 1.050 - -
1 Beton lantai kerja 1PC:3Psr:5Krl m3 1,93 - -
2 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 54,10 - -
3 Pembesian BJTP U-24 & BJTD U-40 kg 6.693,71 - -
4 Bekisting Kayu m2 35,22 - -
C.12 Pilecap type PC-28 EL. - 1.850 - -
1 Beton lantai kerja 1PC:3Psr:5Krl m3 1,93 - -
2 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 54,10 - -
3 Pembesian BJTP U-24 & BJTD U-40 kg 6.693,71 - -
4 Bekisting Kayu m2 33,72 - -
Jumlah Pekerjaan Pile Cap -

Page 7 of 23
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Volume
( Rp. ) ( Rp. )
D. Pekerjaan Tie Beam / Sloof
D.1 Tie Beam/ Sloof type TB-1 EL. - 0.050
1 Beton lantai kerja 1PC:3Psr:5Krl m3 4,30 - -
2 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 61,44 - -
3 Pembesian BJTP U-24 & BJTD U-40 kg 15.014,96 - -
4 Bekisting Kayu m2 278,80 - -
D.2 Tie Beam/ Sloof type TB-1 EL. - 1.050 -
1 Beton lantai kerja 1PC:3Psr:5Krl m3 2,52 - -
2 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 30,52 - -
3 Pembesian BJTP U-24 & BJTD U-40 kg 7.941,21 - -
4 Bekisting Kayu m2 142,79 - -
D.3 Tie Beam/ Sloof type TB-1 EL. - 1.850 -
1 Beton lantai kerja 1PC:3Psr:5Krl m3 0,27 - -
2 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 3,85 - -
3 Pembesian BJTP U-24 & BJTD U-40 kg 1.288,92 - -
4 Bekisting Kayu m2 17,30 - -
D.4 Tie Beam/ Sloof type TB-2 EL. - 0.050 - -
1 Beton lantai kerja 1PC:3Psr:5Krl m3 2,51 - -
2 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 28,76 - -
3 Pembesian BJTP U-24 & BJTD U-40 kg 5.896,05 - -
4 Bekisting Kayu m2 143,01 - -
D.5 Tie Beam/ Sloof type TB-2 EL. - 1.050 - -
1 Beton lantai kerja 1PC:3Psr:5Krl m3 2,46 - -
2 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 27,61 - -
3 Pembesian BJTP U-24 & BJTD U-40 kg 5.695,07 - -
4 Bekisting Kayu m2 143,57 - -
D.6 Tie Beam/ Sloof type TB-2 EL. - 1.850 - -
1 Beton lantai kerja 1PC:3Psr:5Krl m3 0,03 - -
2 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 0,43 - -
3 Pembesian BJTP U-24 & BJTD U-40 kg 101,59 - -
4 Bekisting Kayu m2 1,46 - -
Jumlah Pekerjaan Tie Beam / Sloof -

E. Pekerjaan Plat Lantai 1 (EL. - 1.850 ~ - 0.050)


E.1 Pelat Lantai type S EL. - 0.050
1 Beton lantai kerja 1PC:3Psr:5Krl m3 39,14 - -
2 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 117,42 - -
3 Pembesian Wiremesh Dia 8 - 150 mm (2 Layer) m2 917,81 - -
4 Bekisting Kayu m2 19,41 - -
5 Waterproofing Integral m3 117,42 - -
E.2 Pelat Lantai type S EL. - 1.050 -
1 Beton lantai kerja 1PC:3Psr:5Krl m3 14,53 - -
2 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 43,59 - -
3 Pembesian Wiremesh Dia 8 - 150 mm (2 Layer) m2 368,26 - -
4 Bekisting Kayu m2 16,33 - -
5 Waterproofing Integral m3 43,59 - -
E.2 Pelat Lantai type Pitlift EL. - 1.850 -
1 Beton lantai kerja 1PC:3Psr:5Krl m3 1,29 - -
2 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 7,80 - -
3 Pembesian BJTP U-24 & BJTD U-40 m2 796,13 - -
4 Bekisting Kayu m2 4,72 - -
5 Waterproofing Integral m3 7,80 - -
Jumlah Pekerjaan Plat Lantai -

F Pekerjaan Dinding Pit Lift


F.1 Dinding Pit Lift
2 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 6,32 - -
3 Pembesian BJTP U-24 & BJTD U-40 kg 1.179,01 - -
4 Bekisting Kayu m2 61,71 - -
5 Waterproofing Integral m3 6,32 - -
f.1 Dinding Parameter - -
2 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 12,41 - -
3 Pembesian BJTP U-24 & BJTD U-40 kg 2.028,45 - -
4 Bekisting Kayu m2 156,35 - -
Jumlah Pekerjaan Plat Lantai -

Jumlah Pekerjaan Sub Struktur -

Page 8 of 23
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Volume
( Rp. ) ( Rp. )
III. PEKERJAAN UPER STRUKTUR :
A. STRUKTUR LANTAI 2
Pekerjaan Kolom EL. - 1.050
A.1 Kolom Tipe K1.A uk. 800 x 800 mm
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 7,74 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 3.256,39 - -
3 Bekisting Kolom m2 37,39 - -
A.2 Kolom Tipe K1.B uk. 800 x 800 mm -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 8,25 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 2.977,80 - -
3 Bekisting Kolom m2 36,49 - -
A.3 Kolom Tipe K1.C uk. 800 x 800 mm -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 3,87 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 1.426,45 - -
3 Bekisting Kolom m2 18,32 - -
A.4 Kolom Tipe K1.C1 uk. 800 x 800 mm -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 4,38 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 1.772,09 - -
3 Bekisting Kolom m2 20,93 - -
A.5 Kolom Tipe K1.D uk. 800 x 800 mm -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 15,48 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 3.341,40 - -
3 Bekisting Kolom m2 73,84 - -
A.6 Kolom Tipe K1.E uk. 800 x 800 mm -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 15,48 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 2.678,68 - -
3 Bekisting Kolom m2 73,77 - -
A.7 Kolom type K1-F uk. 300 x 500 mm - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 54,20 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 9.777,92 - -
3 Bekisting Kolom m2 34,44 - -
A.8 Kolom Tipe K1.G uk. 800 x 800 mm -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 8,25 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 2.236,82 - -
3 Bekisting Kolom m2 34,44 - -
A.9 Kolom Tipe K2 uk. 300 x 500 mm -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 9,60 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 3.632,19 - -
3 Bekisting Kolom m2 95,45 - -
Jumlah Pekerjaan Kolom -

B. Pekerjaan Shearwall
B.1 Shearwall type SW-1
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 70,79 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 33.083,15 - -
3 Bekisting Shearwall m2 344,02 - -
B.2 Shearwall type SW-2 - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 36,57 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 12.821,60 - -
3 Bekisting Shearwall m2 178,26 - -
Jumlah Pekerjaan Shearwall -

Page 9 of 23
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Volume
( Rp. ) ( Rp. )
C. Pekerjaan Balok EL. + 4.950
C.1 Balok type B1 uk. 400 x 650 mm
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 17,94 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 1.976,99 - -
3 Bekisting Balok m2 96,60 - -
C.2 Balok type CB1 uk. 400 x 650 mm - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 3,08 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 424,87 - -
3 Bekisting Balok m2 18,45 - -
C.3 Balok type B2 uk. 300 x 500 mm - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 12,15 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 2.028,69 - -
3 Bekisting Balok m2 81,58 - -
C.4 Balok type B2A uk. 300 x 500 mm - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 14,59 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 1.857,32 - -
3 Bekisting Balok m2 100,39 - -
C.5 Balok type CB2 uk. 300 x 500 mm - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 0,87 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 192,75 - -
3 Bekisting Balok m2 6,92 - -
C.6 Balok type G1 uk. 400 x 800 - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 11,77 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 3.086,30 - -
3 Bekisting Balok m2 62,56 - -
C.7 Balok type CG1 uk. 400 x 800 - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 1,94 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 638,68 - -
3 Bekisting Balok m2 11,58 - -
C.8 Balok type G2 uk. 400 x 650 mm - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 21,68 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 3.971,75 - -
3 Bekisting Balok m2 118,03 - -
C.9 Balok type G2-1 uk. 400 x 650 mm - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 3,74 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 806,50 - -
3 Bekisting Balok m2 20,16 - -
C.10 Balok type CG2 uk. 400 x 650 mm - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 2,31 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 498,47 - -
3 Bekisting Balok m2 14,02 - -
C.11 Balok type G2A uk. 400 x 650 mm - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 35,62 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 5.818,77 - -
3 Bekisting Balok m2 200,77 - -
C.12 Balok type G2B uk. 400 x 650 mm - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 13,45 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 2.617,95 - -
3 Bekisting Balok m2 78,64 - -
C.13 Balok type G3 uk. 300 x 500 mm - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 1,15 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 213,27 - -
3 Bekisting Balok m2 8,50 - -
C.14 Balok type G3A uk. 300 x 500 mm - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 0,77 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 237,10 - -
3 Bekisting Balok m2 5,17 - -
C.15 Balok type G3B uk. 300 x 500 mm - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 3,35 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 500,91 - -
3 Bekisting Balok m2 27,61 - -
C.16 Balok type G4 uk. 400 x 800 - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 1,67 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 557,78 - -
3 Bekisting Balok m2 9,74 - -

Page 10 of 23
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Volume
( Rp. ) ( Rp. )
C.17 Balok type G4A uk. 400 x 800 - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 2,25 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 658,26 - -
3 Bekisting Balok m2 13,62 - -
C.18 Balok type LB uk. 300 x 500 mm - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 10,54 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 1.818,83 - -
3 Bekisting Balok m2 81,84 - -
C.19 Balok type BP uk. 150 x 300 mm - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 0,59 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 150,24 - -
3 Bekisting Balok m2 8,54 - -
C.20 Balok type B. Lift uk. 200 x 300 mm - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 1,26 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 333,93 - -
3 Bekisting Balok m2 16,74 - -
Jumlah Pekerjaan Balok -

D. Pekerjaan Plat EL. + 4.950


D.1 Pelat Tipe S2
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 87,00 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 12.054,00 - -
3 Bekisting Plat m2 596,34 - -
D.2 Pelat Tipe S3 - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 50,07 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 5.784,87 - -
3 Bekisting Plat m2 393,86 - -
Jumlah Pekerjaan Plat -

E. Pekerjaan Tangga
E.1 Ramp Difabel (AS B, E & 5-6)
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 4,84 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 932,64 - -
3 Bekisting m2 30,90 - -
E.1 Tangga Entrance (AS B-E & 5-6) -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 7,68 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 1.354,30 - -
3 Bekisting m2 58,32 - -
E.1 Tangga Entrance (AS A-B, E-F & 2-3 ) -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 2,63 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 482,62 - -
3 Bekisting m2 21,95 - -
E.1 Tangga Entrance (AS A, E & 1 ) -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 1,55 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 292,40 - -
3 Bekisting m2 13,96 - -
E.2 Tangga (AS A-B & 1-2) -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 7,92 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 1.497,73 - -
3 Bekisting m2 50,80 - -
E.3 Tangga (AS E-F & 1-2) - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 7,92 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 1.497,73 - -
3 Bekisting m2 50,80 - -
E.4 Tangga (AS A-B & 3-4) - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 8,02 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 1.579,05 - -
3 Bekisting m2 68,13 - -
Jumlah Pekerjaan Tangga -

Jumlah Pekerjaan Struktur Lantai 2 -

Page 11 of 23
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Volume
( Rp. ) ( Rp. )
B. STRUKTUR LANTAI 3
Pekerjaan Kolom EL. + 4.950
A.1 Kolom Tipe K1.A uk. 800 x 800 mm
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 5,44 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 1.916,28 - -
3 Bekisting Kolom m2 26,80 - -
A.2 Kolom Tipe K1.B uk. 800 x 800 mm - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 5,44 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 1.257,43 - -
3 Bekisting Kolom m2 23,60 - -
A.3 Kolom Tipe K1.C uk. 800 x 800 mm - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 2,72 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 855,93 - -
3 Bekisting Kolom m2 13,44 - -
A.4 Kolom Tipe K1.C1 uk. 800 x 800 mm - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 2,72 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 994,80 - -
3 Bekisting Kolom m2 13,60 - -
A.5 Kolom Tipe K1.D uk. 800 x 800 mm - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 10,88 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 1.515,28 - -
3 Bekisting Kolom m2 52,72 - -
A.6 Kolom Tipe K1.E uk. 800 x 800 mm - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 10,88 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 1.519,24 - -
3 Bekisting Kolom m2 53,13 - -
A.7 Kolom type K1-F uk. 300 x 500 mm - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 27,20 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 4.304,25 - -
3 Bekisting Kolom m2 135,16 - -
A.8 Kolom Tipe K1.G uk. 800 x 800 mm - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 5,44 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 943,77 - -
3 Bekisting Kolom m2 23,21 - -
A.9 Kolom Tipe K2 uk. 300 x 500 mm - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 6,37 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 2.028,93 - -
3 Bekisting Kolom m2 67,96 - -
Jumlah Pekerjaan Kolom -

B. Pekerjaan Shearwall + 4.950


B.1 Shearwall type SW-1 -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 46,64 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 17.031,63 - -
3 Bekisting Shearwall m2 229,70 - -
B.2 Shearwall type SW-2 - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 23,37 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 7.503,64 - -
3 Bekisting Shearwall m2 116,27 - -
Jumlah Pekerjaan Shearwall -

Page 12 of 23
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Volume
( Rp. ) ( Rp. )
C. Pekerjaan Balok EL. + 9.200
C.1 Balok type B2 uk. 300 x 500 mm
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 2,56 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 536,17 - -
3 Bekisting Balok m2 17,77 - -
C.2 Balok type B2A uk. 300 x 500 mm -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 3,12 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 745,61 - -
3 Bekisting Balok m2 20,80 - -
C.3 Balok type B2B uk. 400 x 800 - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 9,98 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 1.342,43 - -
3 Bekisting Balok m2 69,23 - -
C.4 Balok type BP uk. 150 x 300 - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 0,53 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 133,06 - -
3 Bekisting Balok m2 7,88 - -
C.5 Balok Tipe G1 uk. 400 x 650 mm -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 5,88 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 1.071,19 - -
3 Bekisting Balok m2 36,80 - -
C.6 Balok Tipe G2 uk. 400 x 650 mm - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 7,22 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 1.985,17 - -
3 Bekisting Balok m2 41,28 - -
C.7 Balok Tipe G2-1 uk. 400 x 650 mm - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 1,87 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 391,40 - -
3 Bekisting Balok m2 10,36 - -
C.8 Balok Tipe G2A uk. 400 x 650 mm - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 19,32 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 4.298,10 - -
3 Bekisting Balok m2 111,35 - -
C.9 Balok Tipe G2B uk. 400 x 650 mm -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 16,87 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 2.646,49 - -
3 Bekisting Balok m2 110,30 - -
C.10 Balok Tipe G2C uk. 400 x 650 mm - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 3,74 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 724,25 - -
3 Bekisting Balok m2 20,73 - -
C.11 Balok Tipe G2D uk. 400 x 800 mm - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 6,43 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 724,81 - -
3 Bekisting Balok m2 34,97 - -
C.12 Balok Tipe G2E uk. 400 x 650 mm - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 3,32 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 756,24 - -
3 Bekisting Balok m2 18,43 - -
C.13 Balok Tipe G3 uk. 300 x 500 mm - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 1,15 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 262,74 - -
3 Bekisting Balok m2 8,51 - -
C.14 Balok Tipe G3A uk. 300 x 500 mm - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 0,82 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 359,52 - -
3 Bekisting Balok m2 5,35 - -
C.15 Balok Tipe G3B uk. 300 x 500 mm - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 2,33 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 352,00 - -
3 Bekisting Balok m2 19,21 - -
C.16 Balok Tipe G3C uk. 300 x 500 mm - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 1,02 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 204,88 - -
3 Bekisting Balok m2 7,95 - -

Page 13 of 23
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Volume
( Rp. ) ( Rp. )
C.17 Balok type G4 uk. 400 x 800 mm - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 1,67 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 590,51 - -
3 Bekisting Balok m2 9,70 - -
C.18 Balok type G4A uk. 400 x 800 mm -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 2,30 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 758,11 - -
3 Bekisting Balok m2 13,51 - -
C.19 Balok type B. Lift uk. 200 x 300 mm -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 2,52 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 667,87 - -
3 Bekisting Balok m2 33,48 - -
Jumlah Pekerjaan Balok -

D. Pekerjaan Plat EL. + 9.200


D.1 Pelat Tipe S2
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 8,25 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 1.159,40 - -
3 Bekisting Plat m2 60,77 - -
D.2 Pelat Tipe S3 - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 50,09 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 5.766,41 - -
3 Bekisting Plat m2 394,89 - -
Jumlah Pekerjaan Plat -

E. Pekerjaan Tangga
E.1 Tangga (AS A-B & 1-2)
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 4,00 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 819,29 - -
3 Bekisting m2 35,07 - -
E.2 Tangga (AS E-F & 1-2) - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 4,00 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 819,29 - -
3 Bekisting m2 35,07 - -
E.3 Tangga (AS A-B & 3-4) - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 7,36 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 1.505,39 - -
3 Bekisting m2 62,45 - -
Jumlah Pekerjaan Tangga -
Jumlah Pekerjaan Struktur Lantai 3 -

C. STRUKTUR LANTAI 4
Pekerjaan Kolom EL. + 9.200
A.1 Kolom Tipe K1.A uk. 800 x 800 mm
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 5,44 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 1.855,05 - -
3 Bekisting Kolom m2 26,74 - -
A.2 Kolom Tipe K1.B uk. 800 x 800 mm - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 5,44 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 975,59 - -
3 Bekisting Kolom m2 23,27 - -
A.3 Kolom Tipe K1.C uk. 800 x 800 mm - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 2,72 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 855,93 - -
3 Bekisting Kolom m2 13,44 - -
A.4 Kolom Tipe K1.C1 uk. 800 x 800 mm - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 2,72 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 952,52 - -
3 Bekisting Kolom m2 13,60 - -

Page 14 of 23
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Volume
( Rp. ) ( Rp. )
A.5 Kolom Tipe K1.D uk. 800 x 800 mm - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 10,88 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 1.515,28 - -
3 Bekisting Kolom m2 52,48 - -
A.6 Kolom Tipe K1.E uk. 800 x 800 mm - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 10,88 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 1.515,28 - -
3 Bekisting Kolom m2 52,60 - -
A.7 Kolom type K1-F uk. 300 x 500 mm - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 27,20 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 3.607,93 - -
3 Bekisting Kolom m2 133,54 - -
A.8 Kolom Tipe K1.G uk. 800 x 800 mm - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 5,44 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 757,64 - -
3 Bekisting Kolom m2 23,16 - -
A.9 Kolom Tipe K2 uk. 300 x 500 mm - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 6,37 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 2.028,93 - -
3 Bekisting Kolom m2 67,96 - -
Jumlah Pekerjaan Kolom -

B. Pekerjaan ShearWall + 9.200


B.1 Shearwall type SW-1
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 69,83 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 16.169,26 - -
3 Bekisting Shearwall m2 228,76 - -
B.2 Shearwall type SW-2 - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 23,37 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 6.396,02 - -
3 Bekisting Shearwall m2 115,88 - -
Jumlah Pekerjaan Shearwall -

C. Pekerjaan Balok EL. + 13.450


C.1 Balok type B2 uk. 300 x 500 mm
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 8,05 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 1.231,01 - -
3 Bekisting Balok m2 54,56 - -
C.2 Balok type B2A uk. 300 x 500 mm - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 3,16 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 660,84 - -
3 Bekisting Balok m2 21,10 - -
C.3 Balok type B2B uk. 300 x 500 mm -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 3,46 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 540,04 - -
3 Bekisting Balok m2 23,06 - -
C.4 Balok type BP uk. 150x 300 mm - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 0,60 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 150,62 - -
3 Bekisting Balok m2 8,75 - -
C.5 Balok type CB2 uk. 300 x 500 - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 2,02 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 358,87 - -
3 Bekisting Balok m2 15,23 - -
C.6 Balok type CG2 uk. 400 x 800 - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 2,31 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 498,35 - -
3 Bekisting Balok m2 14,78 - -
C.7 Balok type G1 uk. 300 x 650 mm - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 5,88 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 1.071,19 - -
3 Bekisting Balok m2 32,01 - -
C.8 Balok Tipe G2 uk. 400 x 650 mm - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 3,74 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 965,39 - -
3 Bekisting Balok m2 20,16 - -

Page 15 of 23
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Volume
( Rp. ) ( Rp. )
C.9 Balok Tipe G2-1 uk. 400 x 650 mm - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 3,74 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 804,80 - -
3 Bekisting Balok m2 20,44 - -
C.10 Balok Tipe G2A uk. 400 x 650 mm - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 26,71 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 7.213,89 - -
3 Bekisting Balok m2 150,17 - -
C.11 Balok Tipe G2A-1 uk. 400 x 650 mm - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 8,71 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 1.990,09 - -
3 Bekisting Balok m2 47,43 - -
C.12 Balok Tipe G2B uk. 400 x 650 mm - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 11,35 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 1.718,15 - -
3 Bekisting Balok m2 72,55 - -
C.13 Balok Tipe G2C uk. 400 x 650 mm -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 3,32 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 857,97 - -
3 Bekisting Balok m2 18,04 - -
C.14 Balok Tipe G3 uk. 300 x 500 mm -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 1,15 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 310,06 - -
3 Bekisting Balok m2 8,51 - -
C.15 Balok Tipe G3A uk. 300 x 500 mm - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 0,82 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 452,14 - -
3 Bekisting Balok m2 5,35 - -
C.16 Balok Tipe G3B uk. 300 x 500 mm - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 2,34 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 420,32 - -
3 Bekisting Balok m2 19,87 - -
C.17 Balok Tipe G3C uk. 300 x 500 mm - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 1,02 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 244,02 - -
3 Bekisting Balok m2 7,51 - -
C.18 Balok type G4 uk. 400 x 800 mm - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 1,67 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 675,66 - -
3 Bekisting Balok m2 9,76 - -
C.19 Balok type G4A uk. 400 x 800 mm - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 2,30 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 865,26 - -
3 Bekisting Balok m2 13,51 - -
C.20 Balok type LB uk. 300 x 500 mm -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 6,46 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 728,22 - -
3 Bekisting Balok m2 50,49 - -
C.21 Balok type B. Lift uk. 200 x 300 mm -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 1,26 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 333,93 - -
3 Bekisting Balok m2 16,74 - -
Jumlah Pekerjaan Balok -

D. Pekerjaan Plat EL. + 13.450


D.1 Pelat Tipe S2
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 47,35 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 6.371,25 - -
3 Bekisting Plat m2 324,65 - -
D.2 Pelat Tipe S3 -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 26,36 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 3.390,53 - -
3 Bekisting Plat m2 221,72 - -
Jumlah Pekerjaan Plat -

Page 16 of 23
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Volume
( Rp. ) ( Rp. )
E. Pekerjaan Tangga
E.1 Tangga (AS A-B & 1-2)
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 4,00 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 819,29 - -
3 Bekisting m2 35,07 - -
E.2 Tangga (AS E-F & 1-2) - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 4,00 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 819,29 - -
3 Bekisting m2 35,07 - -
E.3 Tangga (AS A-B & 3-4) - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 7,36 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 1.505,39 - -
3 Bekisting m2 62,45 - -
Jumlah Pekerjaan Tangga -
F. Pekerjaan Atap Baja
F1 Pekerjaan Atap Baja Depan
1 Base plate t= 20mm Kg 876,67 - -
2 Bolt anchor M22, L = 500 mm pcs 192,00 - -
3 Grouting 50 mm m2 5,58 - -
4 Pipa Ø 12" Sch 40 kg 956,40 - -
5 Pipa Ø 8" Sch 40 kg 4.224,36 - -
6 Pipa Ø 8" Lengkung kg 910,57 - -
7 Pipa Ø 6" Sch 40 kg 8.851,03 - -
8 Pipa Ø 6" Lengkung kg 604,76 - -
9 Pipa Ø 4" Sch 40 kg 1.149,96 - -
10 Pipa Ø 3" Sch 40 kg 3.939,41 - -
11 C 150 X 50 X 20 X 3.2 kg 4.218,24 - -
12 Plate 8 mm kg 837,74 - -
12 Plate 10 mm kg 234,14 - -
12 Plate 12 mm kg 2.068,14 - -
12 Bolt HTB A325 M12 pcs 1.032,00 - -
12 Bolt HTB A325 M16 pcs 540,00 - -
12 Bolt HTB A325 M20 pcs 160,00 - -
12 Zincromate m2 760,88 - -
Jumlah Pekerjaan Atap Baja -
Jumlah Pekerjaan Struktur Lantai 4 -

Page 17 of 23
REKAPITULASI
ENGINEERING ESTIMATE (EE)
PEKERJAAN : PEKERJAAN GROUND WATER TANK DAN POWER HOUSE
PROYEK : PEMBANGUNAN KAMPUS PEPI
LOKASI : KABUPATEN TANGERANG, BANTEN
#REF! : 2019
Sub Harga Jumlah Harga
No. Uraian Pekerjaan
( Rp. ) ( Rp. )

PEKERJAAN STRUKTUR
PEKERJAAN PONDASI : -
Pekerjaan Tiang Pancang -
PEKERJAAN TANAH : -
Pekerjaan Galian Dan Urugan -
PEKERJAAN SUB STRUKTUR : -
Pekerjaan Pile Cap -
Pekerjaan Tie Beam / Sloof -
Pekerjaan Plat -
Pelat Lantai STP -
Pelat Lantai Dudukan Tangki 8000 Liter -

STRUKUR LANTAI BASEMENT -


Pekerjaan Kolom EL. - 4.300 -
Pekerjaan Retaining Wall EL. - 4.300 -
Pekerjaan Balok EL. - 0.050 -
Pekerjaan Plat EL. - 0.050 ..................., .................................. -
Pekerjaan Tangga EL. - 4.300 PENAWAR -
Pekerjaan Baja EL. - 0.050 CV./PT. ................................................ -

STRUKUR LANTAI 1 -
Pekerjaan Kolom EL. - 0.050 -
Pekerjaan Balok EL. + 5.300 -
Pekerjaan Plat EL. + 5.300 ...................................... -
JABATAN
STRUKUR LANTAI ATAP -
Pekerjaan Kolom EL. + 5.300 -
Pekerjaan Balok EL. + 7.500 -
Pekerjaan Plat EL. + 7.500 -

JUMLAH PEKERJAAN STRUKTUR -

Page 18 of 23
ENGINEERING ESTIMATE (EE)
PEKERJAAN : PEKERJAAN GROUND WATER TANK DAN POWER HOUSE
PROYEK : PEMBANGUNAN KAMPUS PEPI
LOKASI : KABUPATEN TANGERANG, BANTEN
#REF! : 2019
Harga Satuan ( Jumlah Harga
No. Uraian Pekerjaan Satuan Volume
Rp. ) ( Rp. )

II. PEKERJAAN STRUKTUR


II.1 PEKERJAAN PONDASI :
A.1 Pekerjaan Tiang Pancang
1 Pasang Bouwplank / Uitset m' 92,50 - -
2 Mobilisasi & demobilisasi peralatan Pancang ls 1,00 Include -
3 Penentuan titik tiang pancang ttk 27,00 - -
4 Tiang pancang square pile 50x50 cm (8 m) m' 216,00 - -
5 Pemancangan + Handling m' 216,00 - -
6 Pemotongan Tiang Pancang termasuk buang puing keluar m3 6,75 - -
Jumlah Pekerjaan Pondasi -

II.2 PEKERJAAN TANAH :


B. Pekerjaan Galian Dan Urugan
B.1 Galian Tanah GWT -
1 Galian Tanah m3 1.415,00 - -
2 Urugan Tanah Kembali Bekas Galian m3 195,52 - -
3 Buangan Tanah Bekas Galian Dalam Lokasi Proyek m3 1.219,48 - -
B.2 Pilecap type PC-1 EL. - 4.300 - -
1 Galian Tanah m3 23,75 - -
2 Urugan Tanah Kembali Bekas Galian m3 - -
3 Buangan Tanah Bekas Galian Dalam Lokasi Proyek m3 23,75 - -
4 Urugan Pasir Urug Tebal 10 cm m3 2,50 - -
B.3 Pilecap type PC-1 EL. - 0.050 - -
1 Galian Tanah m3 1,90 - -
2 Urugan Tanah Kembali Bekas Galian m3 - -
3 Buangan Tanah Bekas Galian Dalam Lokasi Proyek m3 1,90 - -
4 Urugan Pasir Urug Tebal 10 cm m3 0,20 - -
B.4 Tie Beam/ Sloof type TB-1 EL. - 4.300 - -
1 Galian Tanah m3 39,82 - -
2 Urugan Tanah Kembali Bekas Galian m3 - -
3 Buangan Tanah Bekas Galian Dalam Lokasi Proyek m3 39,82 - -
4 Urugan Pasir Urug Tebal 10 cm m3 4,96 - -
B.5 Tie Beam/ Sloof type TB-2 EL. - 4.300 - -
1 Galian Tanah m3 12,72 - -
2 Urugan Tanah Kembali Bekas Galian m3 - -
3 Buangan Tanah Bekas Galian Dalam Lokasi Proyek m3 12,72 - -
4 Urugan Pasir Urug Tebal 10 cm m3 1,74 - -
B.6 Pelat Lantai EL. - 4.300 - -
1 Galian Tanah m3 571,52 - -
2 Urugan Tanah Kembali Bekas Galian m3 - -
3 Buangan Tanah Bekas Galian Dalam Lokasi Proyek m3 571,52 - -
4 Urugan Pasir Urug Tebal 10 cm m3 20,68 - -
B.7 Pengaman Galian dan Pengeringan m' 90,00 - -
B.8 Pelat Lantai STP EL. - 3.000 - -
1 Galian Tanah m3 288,00 - -
2 Buangan Tanah Bekas Galian Dalam Lokasi Proyek m3 288,00 - -
3 Urugan Pasir Urug Tebal 10 cm m3 6,00 - -
B.9 Pengaman Galian dan Pengeringan m' 40,00 - -
B.10 Pelat Lantai Dudukan Tangki 8000 Liter EL. - 3.000 - -
1 Galian Tanah m3 68,45 - -
2 Buangan Tanah Bekas Galian Dalam Lokasi Proyek m3 68,45 - -
3 Urugan Pasir Urug Tebal 10 cm m3 0,74 - -
B.11 Pengaman Galian dan Pengeringan m' 19,40 - -
B.12 Anti Rayap m2 170,00 - -
Jumlah Pekerjaan Tanah -

II.3 PEKERJAAN SUB STRUKTUR :

Page 19 of 23
Harga Satuan ( Jumlah Harga
No. Uraian Pekerjaan Satuan Volume
Rp. ) ( Rp. )
C. Pekerjaan Pile Cap
C.1 Pilecap type PC-1 EL. - 4.300
1 Beton lantai kerja 1PC:3Psr:5Krl m3 1,25 - -
2 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 20,00 - -
3 Pembesian BJTP U-24 & BJTD U-40 kg 4.144,88 - -
4 Bekisting Kayu m2 49,96 - -
C.2 Pilecap type PC-1 EL. - 0.050 - -
1 Beton lantai kerja 1PC:3Psr:5Krl m3 0,10 - -
2 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 1,60 - -
3 Pembesian BJTP U-24 & BJTD U-40 kg 332,51 - -
4 Bekisting Kayu m2 4,88 - -
Jumlah Pekerjaan Pile Cap EL. - 1.000 -

D. Pekerjaan Tie Beam / Sloof


D.1 Tie Beam/ Sloof type TB-1 EL. - 4.300
1 Beton lantai kerja 1PC:3Psr:5Krl m3 2,48 - -
2 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 32,37 - -
3 Pembesian BJTP U-24 & BJTD U-40 kg 9.098,75 - -
4 Bekisting Kayu m2 122,09 - -
D.1 Tie Beam/ Sloof type TB-2 EL. - 4.300 -
1 Beton lantai kerja 1PC:3Psr:5Krl m3 0,87 - -
2 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 10,10 - -
3 Pembesian BJTP U-24 & BJTD U-40 kg 2.128,35 - -
4 Bekisting Kayu m2 33,33 - -
Jumlah Pekerjaan Tie Beam / Sloof -

E. Pekerjaan Plat
E.1 Pelat Lantai EL. - 4.300
1 Beton lantai kerja 1PC:3Psr:5Krl m3 10,34 - -
2 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 62,04 - -
3 Pembesian BJTP U-24 & BJTD U-40 kg 13.604,70 - -
4 Bekisting Kayu m2 19,35 - -
5 Integral m3 62,04 - -
Jumlah Pekerjaan Plat Lantai -
F. Pelat Lantai STP
F.1 Pelat Lantai STP EL. - 3.000
1 Beton lantai kerja 1PC:3Psr:5Krl m3 3,00 - -
2 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 18,00 - -
3 Pembesian BJTP U-24 & BJTD U-40 kg 2.824,18 - -
4 Bekisting Kayu m2 9,60 - -
5 Beton Integral m3 18,00 - -
6 Urugan Pasir m3 243,82 - -
Jumlah Pekerjaan Plat Lantai -
G. Pelat Lantai Dudukan Tangki 8000 Liter
G.1 Pelat Lantai Dudukan Tangki 8000 Liter EL. - 3.000
1 Beton lantai kerja 1PC:3Psr:5Krl m3 0,37 - -
2 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 2,23 - -
3 Pembesian BJTP U-24 & BJTD U-40 kg 414,66 - -
4 Bekisting Kayu m2 3,42 - -
5 Beton Integral m3 2,23 - -
6 Urugan Pasir m3 60,97 - -
Jumlah Pekerjaan Plat Lantai -
Jumlah Pekerjaan Sub Struktur -

Page 20 of 23
Harga Satuan ( Jumlah Harga
No. Uraian Pekerjaan Satuan Volume
Rp. ) ( Rp. )
A. STRUKUR LANTAI BASEMENT
Pekerjaan Kolom EL. - 4.300
A.1 Kolom Tipe K-1
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 24,72 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 4.061,73 - -
3 Bekisting Kolom m2 144,77 - -
4 Beton Integral m3 24,72 - -
A.2 Kolom type KP-1 -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 2,06 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 361,24 - -
3 Bekisting Kolom m2 15,77 - -
4 Beton Integral m3 2,06 - -
A.3 Kolom type KP-2 - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 1,03 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 181,25 - -
3 Bekisting Kolom m2 5,82 - -
4 Beton Integral m3 1,03 - -
A.4 Kolom type KP-3 - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 0,68 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 111,95 - -
3 Bekisting Kolom m2 4,99 - -
4 Beton Integral m3 0,68 - -
Jumlah Pekerjaan Kolom -

B. Pekerjaan Retaining Wall EL. - 4.300


B.1 Retaining Wall type A - 4.300
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 8,14 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 1.213,62 - -
3 Bekisting Shearwall m2 80,49 - -
4 Beton Integral m3 8,14 - -
5 Water Stop m' 83,50 - -
B.2 Retaining Wall type B - 4.300 - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 15,87 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 3.525,56 - -
3 Bekisting Shearwall m2 79,65 - -
4 Beton Integral m3 15,87 - -
5 Water Stop m' 41,60 - -
Jumlah Pekerjaan Shearwall -

Page 21 of 23
Harga Satuan ( Jumlah Harga
No. Uraian Pekerjaan Satuan Volume
Rp. ) ( Rp. )
C. Pekerjaan Balok EL. - 0.050
C.1 Balok type B-1
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 9,97 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 1.232,19 - -
3 Bekisting Balok m2 67,34 - -
C.2 Balok type B-2 - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 5,50 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 860,22 - -
3 Bekisting Balok m2 42,95 - -
C.3 Balok type G-1 - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 2,17 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 314,53 - -
3 Bekisting Balok m2 11,62 - -
C.3 Balok type G2-A - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 7,90 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 977,31 - -
3 Bekisting Balok m2 47,35 - -
C.3 Balok type G2-B - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 13,08 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 2.201,43 - -
3 Bekisting Balok m2 82,34 - -
C.4 Balok type TB-1 - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 3,00 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 820,94 - -
3 Bekisting Balok m2 19,07 - -
C.5 Balok type TB-2 - -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 1,14 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 238,86 - -
3 Bekisting Balok m2 7,78 - -
Jumlah Pekerjaan Balok -

D. Pekerjaan Plat EL. - 0.050


D.1 Pelat Lantai type S1 -0.050
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 31,48 - -
2 Pembesian BJTP U-24 & BJTD U-40 m2 4.348,57 - -
3 Bekisting Kayu m2 214,39 - -
D.2 Penebalan Plat -0.050 -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 5,11 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 353,35 - -
3 Bekisting Kayu m2 9,19 - -
Jumlah Pekerjaan Plat -

E. Pekerjaan Tangga EL. - 4.300


E.1 Tangga 1 (AS E)
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 3,53 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 1.059,11 - -
3 Bekisting m2 29,93 - -
Jumlah Pekerjaan Tangga -
F. Pekerjaan Baja EL. - 0.050
F.1 Pekerjaan Baja Dudukan Tanki 2000 Liter EL. -0.050
1 Base plate t=10mm Kg 13,72 - -
2 Bolt anchor M12, L = 300 mm bh 8,00 - -
2 Grouting 50 mm m2 0,17 - -
2 UNP 150 x 75 x 6.5 x 10 Kg 631,65 - -
2 Zincromate m2 61,30 - -
Jumlah Pekerjaan Tangga -

Jumlah Pekerjaan Struktur Lantai 1 -

Page 22 of 23
Harga Satuan ( Jumlah Harga
No. Uraian Pekerjaan Satuan Volume
Rp. ) ( Rp. )
B. STRUKUR LANTAI 1
Pekerjaan Kolom EL. - 0.050
A.1 Kolom Tipe K-1
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 18,55 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 2.023,30 - -
3 Bekisting Kolom m2 146,64 - -
Jumlah Pekerjaan Kolom -

C. Pekerjaan Balok EL. + 5.300


C.1 Balok type B-1
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 4,13 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 394,47 - -
3 Bekisting Balok m2 23,95 - -
C.2 Balok type B-2 -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 0,57 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 69,89 - -
3 Bekisting Balok m2 4,00 - -
C.3 Balok type B-3 -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 8,34 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 1.304,86 - -
3 Bekisting Balok m2 68,10 - -
C.4 Balok type G-1 -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 8,61 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 1.020,96 - -
3 Bekisting Balok m2 51,48 - -
C.5 Balok type G-2 -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 8,19 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 1.330,09 - -
3 Bekisting Balok m2 60,85 - -
Jumlah Pekerjaan Balok -

D. Pekerjaan Plat EL. + 5.300


D.1 Pelat Type S2
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 11,91 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 1.970,87 - -
3 Bekisting Plat m2 98,40 - -
Jumlah Pekerjaan Plat -

Jumlah Pekerjaan Struktur Lantai 2 -

C. STRUKUR LANTAI ATAP


Pekerjaan Kolom EL. + 5.300
A.1 Kolom Tipe K-2
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 0,82 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 331,53 - -
3 Bekisting Kolom m2 12,94 - -
Jumlah Pekerjaan Kolom -

C. Pekerjaan Balok EL. + 7.500


C.1 Balok type B-1
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 0,35 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 56,64 - -
3 Bekisting Balok m2 3,02 - -
C.2 Balok type G-1 -
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 1,90 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 293,26 - -
3 Bekisting Balok m2 16,84 - -
Jumlah Pekerjaan Balok -

D. Pekerjaan Plat EL. + 7.500


D.1 Pelat Tipe S2
1 Beton Ready Mix f'c 30 Mpa Slump ± 12 + 2 cm m3 0,91 - -
2 Pembesian BJTP U-24 & BJTD U-40 kg 166,27 - -
3 Bekisting Plat m2 8,80 - -
Jumlah Pekerjaan Plat -

Page 23 of 23