Anda di halaman 1dari 19

PROYEK : EMC CLINIC, CIANJUR

SUBYEK : REKAPITULASI PEKERJAAN MEP


TANGGAL : FEBRUARI, 2016
DISIAPKAN OLEH : PT. MEKA Optima Consultant

TOTAL HARGA
NO. URAIAN PEKERJAAN MATERIAL UPAH MATERIAL + UPAH
( Rp. ) ( Rp. ) ( Rp. )

REKAPITULASI PEKERJAAN MEP

I. TOTAL PEKERJAAN ELEKTRIKAL 1,349,279,245 161,081,885 1,510,361,130


II. TOTAL PEKERJAAN PENANGKAL PETIR 16,205,000 11,357,500 27,562,500

TOTAL PEKERJAAN ELEKTRIKAL 1,365,484,245 172,439,385 1,537,923,630

III. TOTAL PEKERJAAN ELEKTRONIK

III.1. TOTAL PEKERJAAN TATA SUARA Tidak Ditawarkan Tidak Ditawarkan Tidak Ditawarkan
III.2. TOTAL PEKERJAAN TV 10,679,550 3,681,300 14,360,850
III.3. TOTAL PEKERJAAN FIRE ALARM 102,319,500 5,082,000 107,401,500
III.4. TOTAL PEKERJAAN CCTV 56,509,330 3,990,000 60,499,330
III.5. TOTAL PEKERJAAN LAN 11,084,500 4,315,500 15,400,000

TOTAL PEKERJAAN ELEKTRONIK 180,592,880 17,068,800 197,661,680

IV. TOTAL PEKERJAAN PLUMBING 112,692,790 24,231,795 136,924,585

V.a TOTAL PEKERJAAN VAC 329,774,592 40,829,040 370,603,632

TOTAL PEKERJAAN MEKANIKAL 442,467,382 65,060,835 507,528,217

VI. TOTAL PEKERJAAN GENSET TIDAK DITAWARKAN TIDAK DITAWARKAN TIDAK DITAWARKAN

TOTAL PEKERJAAN MEP 1,988,544,507 254,569,020 2,243,113,527

PPN 10%

GRAND TOTAL 2,243,113,527

RAB-MEP (VAC) 1
PROYEK : EMC CLINIC, CIANJUR
SUBYEK : RENCANA ANGGARAN BIAYA PEKERJAAN VAC
TANGGAL : FEBRUARI, 2016
DISIAPKAN OLEH : PT. MEKA Optima Consultant

Harga Satuan Total Harga Harga Satuan Total Harga


NO. URAIAN PEKERJAAN SAT. VOL.
Material ( Rp. ) Material ( Rp. ) Upah ( Rp. ) Upah ( Rp. )

V. PEKERJAAN VAC

A Peralatan Utama AC

A.1 Lantai GR
a AC OU/IU-G.1 unit 1 23,520,000 23,520,000 1,848,000 1,848,000
Kapasitas : 50,000 Btu/h
Sensible : 43,000 Btu/h
Supply Udara : 1,500 Cfm
Daya Listrik (Indoor Unit) : 5.60 KW
Data Listrik (Indoor Unit) : 380 V/3 Ph/50 Hz
Tipe IU : Ceiling Cocealed

b AC OU/ IU-G.2 unit 1 18,816,000 18,816,000 1,478,400 1,478,400


Kapasitas : 40,000 Btu/h
Sensible : 35,000 Btu/h
Supply Udara : 1,300 Cfm
Daya Listrik (Indoor Unit) : 4.50 KW
Data Listrik (Indoor Unit) : 380 V/3 Ph/50 Hz
Tipe IU : Ceiling Mounted

c AC OU/IU- G.3 & G4 unit 2 18,816,000 37,632,000 1,478,400 2,956,800


Kapasitas : 40,000 Btu/h
Sensible : 35,000 Btu/h
Supply Udara : 1,300 Cfm
Daya Listrik : 4.50 KW
Data Listrik : 380 V/3 Ph/50 Hz
Tipe IU : Ceiling Concealed

d AC OU/ IU-G.5 unit 1 14,112,000 14,112,000 1,344,000 1,344,000


Kapasitas : 30,000 Btu/h
Sensible : 24,000 Btu/h
Supply Udara : 1,000 Cfm
Daya Listrik (Indoor Unit) : 2.80 KW
Data Listrik (Indoor Unit) : 380 V/3 Ph/50 Hz
Tipe IU : Cassete

e AC OU/IU - G.6 unit 2 14,112,000 28,224,000 1,344,000 2,688,000


Kapasitas : 30,000 Btu/h
Sensible : 24,000 Btu/h
Supply Udara : 1,000 Cfm
Daya Listrik : 2.80 KW
Data Listrik : 380V/13Ph/50 Hz
Tipe IU : Cassete

f AC OU/IU - G.7, G.8,G.9 unit 3 3,192,000 9,576,000 336,000 1,008,000


Kapasitas : 9,000 Btu/h
Sensible : 6,000 Btu/h
Supply Udara : 400 Cfm
Daya Listrik : 0.70 KW
Data Listrik : 220 V/1 Ph/50 Hz
Tipe IU : Wall Mounted

g AC OU/IU - G.6 unit 1 16,800,000 16,800,000 1,478,400 1,478,400


Kapasitas : 36,000 Btu/h
Sensible : 25,000 Btu/h
Supply Udara : 1,050 Cfm
Daya Listrik : 3.30 KW
Data Listrik : 380V/13Ph/50 Hz
Tipe IU : Cassete

A.2 Lantai 2
a AC OU/IU - 2.2, 2.5, 2,6, 2.11,2.12, 2.13 unit 6 3,192,000 19,152,000 336,000 2,016,000
Kapasitas : 9,000 Btu/h
Sensible : 6,300 Btu/h
Supply Udara : 400 Cfm
Daya Listrik : 0.70 KW
Data Listrik : 220 V/1 Ph/50 Hz
Tipe IU : Wall Mounted

b AC OU/IU - 2.3, 2,4 unit 2 7,980,000 15,960,000 840,000 1,680,000


Kapasitas : 22,000 Btu/h
Sensible : 17,600 Btu/h
Supply Udara : 800 Cfm
Daya Listrik : 2.10 KW
Data Listrik : 220 V/1 Ph/50 Hz
Tipe IU : Wall Mounted

c AC OU/IU - 2.9, 2.10, 2.14 unit 3 2,856,000 8,568,000 336,000 1,008,000


Kapasitas : 7,000 Btu/h
Sensible : 5,000 Btu/h
Supply Udara : 400 Cfm
Daya Listrik : 0.60 KW
Data Listrik : 220 V/1 Ph/50 Hz
Tipe IU : Wall Mounted

d AC OU/IU - 2.1, 2.7 unit 2 4,149,600 8,299,200 436,800 873,600


Kapasitas : 12,000 Btu/h
Sensible : 8,000 Btu/h
Supply Udara : 400 Cfm
Daya Listrik : 1.10 KW
Data Listrik : 220 V/1 Ph/50 Hz
Tipe IU : Wall Mounted

e AC Split OU/IU - 2.15 unit 2 11,760,000 23,520,000 1,008,000 2,016,000


Kapasitas : 26,000 Btu/h
Sensible : 18,200 Btu/h
Supply Udara : 800 Cfm
Daya Listrik (Indoor Unit) : 2.70 KW
Data Listrik (Indoor Unit) : 380 V/3 Ph/50 Hz
Tipe IU : cassette

f AC Split OU/IU - 2.8 unit 1 16,800,000 16,800,000 1,344,000 1,344,000


Kapasitas : 26,000 Btu/h
Sensible : 19,000 Btu/h
Supply Udara : 800 Cfm
Daya Listrik (Indoor Unit) : 2.70 KW
Data Listrik (Indoor Unit) : 380 V/3 Ph/50 Hz
Tipe IU : Ceiling Concealed

Sub Total - A1 & A.2

B Peralatan Utama Exhaust Fan

RAB-MEP (VAC) 2
PROYEK : EMC CLINIC, CIANJUR
SUBYEK : RENCANA ANGGARAN BIAYA PEKERJAAN VAC
TANGGAL : FEBRUARI, 2016
DISIAPKAN OLEH : PT. MEKA Optima Consultant

Harga Satuan Total Harga Harga Satuan Total Harga


NO. URAIAN PEKERJAAN SAT. VOL.
Material ( Rp. ) Material ( Rp. ) Upah ( Rp. ) Upah ( Rp. )

Pengadaan dan pemasangan peralatan utama Exhaust Fan, lengkap terpasang dengan alat bantu dan
accessories lain yang diperlukan sesuai dengan gambar perencanaan & spesifikasi teknis.

B.1 Lantai GR

a Exhaust Fan - EF-G.1 unit 1 252,000 252,000 33,600 33,600


Kapasitas : 50 Cfm
Daya Motor : 0.10 KW
Data Listrik : 220 V/1 Ph/50 Hz
Type Fan : Cassete
Fungsi : Exhaust

b Exhaust Fan - EF-G.2 unit 1 252,000 252,000 33,600 33,600


Kapasitas : 50 Cfm
Daya Motor : 0.10 KW
Data Listrik : 220 V/1 Ph/50 Hz
Type Fan : Cassete
Fungsi : Exhaust

c Exhaust Fan - EF-G.3 unit 1 840,000 840,000 151,200 151,200


Kapasitas : 350 Cfm
Daya Motor : 0.20 KW
Data Listrik : 220 V/1 Ph/50 Hz
Type Fan : Cassete
Fungsi : Exhaust

d Exhaust Fan - EF-G.4 unit 1 1,411,200 1,411,200 336,000 336,000


Kapasitas : 500 Cfm
Daya Motor : 0.30 KW
Data Listrik : 220 V/1 Ph/50 Hz
Type Fan : Industrial
Fungsi : Exhaust

e Exhaust Fan - EF-G.5 unit 1 3,864,000 3,864,000 672,000 672,000


Kapasitas : 1,350 Cfm
Daya Motor : 0.40 KW
Data Listrik : 220 V/1 Ph/50 Hz
Type Fan : Industrial
Fungsi : Exhaust

B.2 Lantai 2

a Exhaust Fan - EF-2.1 unit 1 252,000 252,000 33,600 33,600


Kapasitas : 50 Cfm
Daya Motor : 0.10 KW
Data Listrik : 220 V/1 Ph/50 Hz
Type Fan : Ceiling
Fungsi : Exhaust

b Exhaust Fan - EF-2.2 unit 1 252,000 252,000 33,600 33,600


Kapasitas : 50 Cfm
Daya Motor : 0.10 KW
Data Listrik : 220 V/1 Ph/50 Hz
Type Fan : Ceiling
Fungsi : Exhaust

c Exhaust Fan - EF-2.3 unit 2 3,124,800 6,249,600 672,000 1,344,000


Kapasitas : 1,000 Cfm
Daya Motor : 0.24 KW
Data Listrik : 220 V/1 Ph/50 Hz
Type Fan : Industrial
Fungsi : Exhaust

Sub Total - B.1 & B.2

TOTAL PERALATAN UTAMA VAC

V.a PEKERJAAN TATA UDARA INSTALASI

C.1 Lantai GR

1 Ducting
Pengadaan dan pemasangan Ducting, lengkap terpasang dengan alat bantu dan accessories lain yang
diperlukan sesuai gambar perencanaan dan spesifikasi teknis.

a Ducting Pre- insulated Alumunium duct


Plenum Box unit 1 211,680 211,680 60,480 60,480
SD 600x300 m 2 181,440 362,880 40,320 80,640
SD 650x250 m 2 181,440 362,880 43,680 87,360
SD 350x250 m 4 120,960 483,840 23,520 94,080
RD 600x300 m 8 181,440 1,451,520 40,320 322,560
RD 650x250 m 6 181,440 1,088,640 40,320 241,920
RD 350x250 m 2 120,960 241,920 23,520 47,040
FAD 150x100 m 11 50,400 554,400 10,080 110,880
Flexible duct 250 m 3 100,800 302,400 16,800 50,400

b Ducting tanpa isolasi


PVC 100 m 18 86,688 1,560,384 50,400 907,200
Material Bantu lot 1 672,000 672,000 -

2 LOUVRE, GRILLE, DIFUUSER DAN DAMPER


Pengadaan dan pemasangan EAG, Louvre, IAG, DG, NRD, VD, lengkap terpasang dengan alat bantu dan
accessories lain yang diperlukan sesuai gambar perencanaan dan spesifikasi teknis.

- Louver Fresh Air 150 x 150 bh 2 100,800 201,600 10,080 20,160


- Louver Exhaust Air 150 x 150 bh 2 100,800 201,600 10,080 20,160
- LD 900 x 200 bh 2 604,800 1,209,600 60,480 120,960
- RAG 900 x 200 bh 2 604,800 1,209,600 60,480 120,960
- VD 150 x 100 bh 2 100,800 201,600 10,080 20,160
Material Bantu lot

3
Pipa Refrigerant
Pengadaan dan pemasangan pipa Refrigerant bahan pipa Tembaga, lengkap terpasang dengan isolasi
accessories lain yang diperlukan sesuai gambar perencanaan dan spesifikasi teknis.

- Pipa Refrigerant 3/8" (OU/IU - G.1) m 12.0 57,120 685,440 10,080 120,960
- Pipa Refrigerant 5/8" (OU/IU - G.1) m 12.0 127,680 1,532,160 16,800 201,600
- Pipa Refrigerant 3/8" (OU/IU - G.2) m 7.0 57,120 399,840 10,080 70,560
- Pipa Refrigerant 5/8" (OU/IU - G.2) m 7.0 127,680 893,760 16,800 117,600
- Pipa Refrigerant 3/8" (OU/IU - G.3) m 23.0 57,120 1,313,760 10,080 231,840
- Pipa Refrigerant 5/8" (OU/IU - G.3) m 23.0 127,680 2,936,640 16,800 386,400
- Pipa Refrigerant 3/8" (OU/IU - G.4) m 22.0 57,120 1,256,640 10,080 221,760

RAB-MEP (VAC) 3
PROYEK : EMC CLINIC, CIANJUR
SUBYEK : RENCANA ANGGARAN BIAYA PEKERJAAN VAC
TANGGAL : FEBRUARI, 2016
DISIAPKAN OLEH : PT. MEKA Optima Consultant

Harga Satuan Total Harga Harga Satuan Total Harga


NO. URAIAN PEKERJAAN SAT. VOL.
Material ( Rp. ) Material ( Rp. ) Upah ( Rp. ) Upah ( Rp. )

- Pipa Refrigerant 5/8" (OU/IU - G.4) m 22.0 127,680 2,808,960 16,800 369,600
- Pipa Refrigerant 3/8" (OU/IU - G.5) m 25.0 57,120 1,428,000 10,080 252,000
- Pipa Refrigerant 5/8" (OU/IU - G.5) m 25.0 127,680 3,192,000 16,800 420,000
- Pipa Refrigerant 3/8" (OU/IU - G.6) m 59.0 57,120 3,370,080 10,080 594,720
- Pipa Refrigerant 5/8" (OU/IU - G.6) m 59.0 127,680 7,533,120 16,800 991,200
- Pipa Refrigerant 1/4" (OU/IU - G.7) m 5.0 40,320 201,600 8,400 42,000
- Pipa Refrigerant 3/8" (OU/IU - G.7) m 5.0 57,120 285,600 10,080 50,400
- Pipa Refrigerant 1/4" (OU/IU - G.8) m 12.0 40,320 483,840 8,400 100,800
- Pipa Refrigerant 3/8" (OU/IU - G.8) m 12.0 57,120 685,440 10,080 120,960
- Pipa Refrigerant 1/4" (OU/IU - G.9) m 12.0 40,320 483,840 8,400 100,800
- Pipa Refrigerant 3/8" (OU/IU - G.9) m 12.0 57,120 685,440 10,080 120,960
- Pipa Refrigerant 3/8" (OU/IU - G.10) m 16.0 57,120 913,920 10,080 161,280
- Pipa Refrigerant 5/8" (OU/IU - G.10) m 16.0 127,680 2,042,880 16,800 268,800

Material bantu + fitting lot 1 1,344,000 1,344,000 -

4 Pipa Drain

Pengadaan dan pemasangan pipa Drain bahan pipa PVC class AW, lengkap terpasang dengan isolasi dan
accessories lain yang diperlukan sesuai gambar perencanaan dan spesifikasi teknis.

- Pipa Drain 32 mm m 16 35,616 569,856 13,440 215,040


- Pipa Drain 25 mm m 35 24,192 846,720 10,080 352,800
- Pipa Drain 20 mm m 45 18,816 846,720 8,400 378,000
Material bantu + fitting lot 1 504,000 504,000

Sub Total - C.1

C.2 Lantai 2

1 Ducting
Pengadaan dan pemasangan Ducting, lengkap terpasang dengan alat bantu dan accessories lain yang
diperlukan sesuai gambar perencanaan dan spesifikasi teknis.
a Ducting Pre- insulated Alumunium duct
Plenum Box unit 1 211,680 211,680 60,480 60,480
SD 500x200 m 2 141,120 282,240 33,600 67,200
RD 500x200 m 3 141,120 423,360 33,600 100,800
RD 300x200 m 2 110,880 221,760 23,520 47,040
Flexible duct 200 m 3 80,640 241,920 13,440 40,320

b Ducting tanpa isolasi


PVC 100 m 16 86,688 1,387,008 50,400 806,400
Material Bantu lot 1 672,000 672,000 -

2 LOUVRE, GRILLE, DIFFUSER DAN DAMPER


Pengadaan dan pemasangan EAG, Louvre, IAG, DG, NRD, VD, lengkap terpasang dengan alat bantu dan
accessories lain yang diperlukan sesuai gambar perencanaan dan spesifikasi teknis.

- Louver Exhaust Air 150 x 150 bh 2 100,800 201,600 10,080 20,160


- LD 600 x 150 bh 2 403,200 806,400 40,320 80,640
- RAG 600 x 150 bh 2 403,200 806,400 40,320 80,640
Material Bantu lot

3 Pipa Refrigerant

Pengadaan dan pemasangan pipa Refrigerant bahan pipa Tembaga, lengkap terpasang dengan isolasi
accessories lain yang diperlukan sesuai gambar perencanaan dan spesifikasi teknis.

- Pipa Refrigerant 1/4" (OU/IU - 2.1) m 7.0 40,320 282,240 8,400 58,800
- Pipa Refrigerant 3/8" (OU/IU - 2.1) m 7.0 57,120 399,840 10,080 70,560
- Pipa Refrigerant 1/4" (OU/IU - 2.2) m 8.0 40,320 322,560 8,400 67,200
- Pipa Refrigerant 3/8" (OU/IU - 2.2) m 8.0 57,120 456,960 10,080 80,640
- Pipa Refrigerant 1/4" (OU/IU - 2.3) m 4.0 40,320 161,280 8,400 33,600
- Pipa Refrigerant 5/8" (OU/IU - 2.3) m 4.0 127,680 510,720 16,800 67,200
- Pipa Refrigerant 1/4" (OU/IU - 2.4) m 4.0 40,320 161,280 8,400 33,600
- Pipa Refrigerant 5/8" (OU/IU - 2.4) m 4.0 127,680 510,720 16,800 67,200
- Pipa Refrigerant 1/4" (OU/IU - 2.5) m 4.0 40,320 161,280 8,400 33,600
- Pipa Refrigerant 3/8" (OU/IU - 2.5) m 4.0 57,120 228,480 10,080 40,320
- Pipa Refrigerant 1/4" (OU/IU - 2.6) m 4.0 40,320 161,280 8,400 33,600
- Pipa Refrigerant 3/8" (OU/IU - 2.6) m 4.0 57,120 228,480 10,080 40,320
- Pipa Refrigerant 1/4" (OU/IU - 2.7) m 8.0 40,320 322,560 8,400 67,200
- Pipa Refrigerant 1/2" (OU/IU - 2.7) m 8.0 80,640 645,120 13,440 107,520
- Pipa Refrigerant 3/8" (OU/IU - 2.8) m 8.0 57,120 456,960 10,080 80,640
- Pipa Refrigerant 5/8" (OU/IU - 2.8) m 8.0 127,680 1,021,440 16,800 134,400
- Pipa Refrigerant 1/4" (OU/IU - 2.9) m 8.0 40,320 322,560 8,400 67,200
- Pipa Refrigerant 3/8" (OU/IU - 2.9) m 8.0 57,120 456,960 10,080 80,640
- Pipa Refrigerant 1/4" (OU/IU - 2.10) m 9.0 40,320 362,880 8,400 75,600
- Pipa Refrigerant 3/8" (OU/IU - 2.10) m 9.0 57,120 514,080 10,080 90,720
- Pipa Refrigerant 1/4" (OU/IU - 2.11) m 8.0 40,320 322,560 8,400 67,200
- Pipa Refrigerant 3/8" (OU/IU - 2.11) m 8.0 57,120 456,960 10,080 80,640
- Pipa Refrigerant 1/4" (OU/IU - 2.12) m 13.0 40,320 524,160 8,400 109,200
- Pipa Refrigerant 3/8" (OU/IU - 2.12) m 13.0 57,120 742,560 10,080 131,040
- Pipa Refrigerant 1/4" (OU/IU - 2.13) m 13.0 40,320 524,160 8,400 109,200
- Pipa Refrigerant 3/8" (OU/IU - 2.13) m 13.0 57,120 742,560 10,080 131,040
- Pipa Refrigerant 1/4" (OU/IU - 2.14) m 13.0 40,320 524,160 8,400 109,200
- Pipa Refrigerant 1/2" (OU/IU - 2.14) m 13.0 80,640 1,048,320 13,440 174,720
- Pipa Refrigerant 3/8" (OU/IU - 2.15) m 14.0 57,120 799,680 10,080 141,120
- Pipa Refrigerant 5/8" (OU/IU - 2.15) m 14.0 127,680 1,787,520 16,800 235,200
Material bantu + fitting lot 1 1,344,000 1,344,000 -

4 Pipa Drain

Pengadaan dan pemasangan pipa Drain bahan pipa PVC class AW, lengkap terpasang dengan isolasi dan
accessories lain yang diperlukan sesuai gambar perencanaan dan spesifikasi teknis.

- Pipa Drain 25 mm m 35 24,192 846,720 10,080 352,800


- Pipa Drain 20 mm m 74 18,816 1,392,384 8,400 621,600
Material bantu + fitting lot 1 504,000 504,000

Sub Total - C.2

Sub Total - C.1 & C.2

Testing & Commissioning lot 1 3,360,000 3,360,000 3,360,000 3,360,000

Sub Total - D

PEKERJAAN VAC 329,774,592 40,829,040

RAB-MEP (VAC) 4
PROYEK : EMC CLINIC, CIANJUR
SUBYEK : RENCANA ANGGARAN BIAYA PEKERJAAN PLUMBING
TANGGAL : FEBRUARI, 2016
DISIAPKAN OLEH : PT. MEKA Optima Consultant

Harga Satuan Total Harga Harga Satuan Total Harga


NO. URAIAN PEKERJAAN SAT. VOL.
Material ( Rp. ) Material ( Rp. ) Upah ( Rp. ) Upah ( Rp. )

IV. PEKERJAAN PLUMBING

A Peralatan Utama Plumbing

A.1 Peralatan Utama Air Bersih

Pengadaan dan pemasangan Peralatan Utama, lengkap terpasang dengan alat bantu dan accessories lain
yang diperlukan sesuai dengan gambar perencanaan & spesifikasi teknis.

a Boster Pump (BP-01A/B) unit 1 45,500,000 45,500,000 455,000 455,000


Kapasitas : 75 Lpm
Total Head : 25 mtr
Daya Listrik : 2 X 1,8 KW
Data Listrik : 380 V/3 Ph/50 Hz
Type : Centrifugal End Suction
Putaran : 2,900 Rpm
Operasi : Paralel Alternate
Lokasi : Lantai Ground
Jumlah Pompa : 1 Set (2 Pompa)

b Bioseptic System (STP) unit 1 9,500,000 9,500,000 950,000 950,000


Kapasitas : 3 m
BOD Inffluent : Maks.300 mg/L
BOD Effluent : < 20 mg/L
Lokasi : Lantai Ground
Jumlah Unit : 1 Unit

c Bioseptic System (STP) unit 1 8,000,000 8,000,000 800,000 800,000


Kapasitas : 2 m
BOD Inffluent : Maks.300 mg/L
BOD Effluent : < 20 mg/L
Lokasi : Lantai Ground
Jumlah Unit : 1 Unit

d Ground Water Tank (GWT) unit 1 Civil Work


Kapasitas : 4 m
Material : Concrete
Lokasi : Lantai Ground
Jumlah Unit : 1 Unit

Sub Total - A.1

A.2 Lantai ( Ruang Pompa)

a. Pemipaan Plumbing

a.1 Pipa Pemipaan Plumbing


Pengadaan dan pemasangan Air Bersih bahan pipa PPR PN 10, lengkap terpasang dengan alat bantu dan
accessories lain yang diperlukan sesuai dengan gambar perencanaan & spesifikasi teknis.

- Pipa Header 50 mm m 2 111,388 222,775 66,500 133,000


- Pipa Air Bersih 32 mm m 6 65,835 395,010 42,560 255,360
- Pipa Air Bersih 40 mm m 1.0 77,805 77,805 53,200 53,200
Mateiral Bantu + Fitting lot 1 498,750 498,750 -

a.2 Valve-Valve

Pengadaan dan pemasangan Valve-Valve, lengkap terpasang dengan alat bantu dan accessories lain yang
diperlukan sesuai dengan gambar perencanaan & spesifikasi teknis.

- Gate Valve 40 mm bh 1 661,675 661,675 26,600 26,600


- Gate Valve 32 mm bh 4 415,625 1,662,500 21,280 85,120
- Gate Valve 25 mm bh 5 249,375 1,246,875 16,625 83,125
- Check Valve 25 mm bh 2 209,475 418,950 16,625 33,250
- Strainer 32 mm bh 2 382,375 764,750 21,280 42,560
- Flexible Joint 25 mm bh 2 197,838 395,675 16,625 33,250
- Flexible Joint 32 mm bh 2 324,520 649,040 21,280 42,560
- Foot Valve 32 mm bh 2 475,475 950,950 21,280 42,560
- Floating Valve 25 mm bh 2 295,925 591,850 16,625 33,250
Material Bantu lot 1 665,000 665,000 -

Sub Total - A.2 (a.1 s/d a.3)

B. PEKERJAAN INSTALASI PLUMBING

B.1 Lantai Ground


a Pemipaan Air Bersih

Pengadaan dan pemasangan Air Bersih bahan pipa PPR PN 10, lengkap terpasang dengan alat bantu dan
accessories lain yang diperlukan sesuai dengan gambar perencanaan & spesifikasi teknis.

- Pipa AB PPR 40 mm (suplay ke Gedung) m 17 77,805 1,322,685 53,200 904,400


- Pipa AB PPR 40 mm (Riser) m 5 77,805 389,025 53,200 266,000
- Pipa AB PPR 25 mm (Dari PDAM ke Grount Tank) m 55 43,225 2,377,375 33,250 1,828,750
- Pipa AB PPR 25 mm m 15 43,225 635,408 33,250 488,775
- Pipa AB PPR 20 mm (Toilet Disable) m 7 32,585 211,803 26,600 172,900
- Pipa AB PPR 15 mm m 15 27,265 395,343 19,950 289,275
- Pipa AB PPR 15 mm (Coffe Max) 7 27,265 177,223 19,950 129,675
Material + Fitting lot 1 665,000 665,000 -

RAB-MEP (PL) 5
PROYEK : EMC CLINIC, CIANJUR
SUBYEK : RENCANA ANGGARAN BIAYA PEKERJAAN PLUMBING
TANGGAL : FEBRUARI, 2016
DISIAPKAN OLEH : PT. MEKA Optima Consultant

Harga Satuan Total Harga Harga Satuan Total Harga


NO. URAIAN PEKERJAAN SAT. VOL.
Material ( Rp. ) Material ( Rp. ) Upah ( Rp. ) Upah ( Rp. )

b Valve-Valve

Pengadaan dan pemasangan Valve-valve, lengkap terpasang dengan alat bantu dan accessories lain yang
diperlukan sesuai dengan gambar perencanaan & spesifikasi teknis.

- Gate Valve 40 mm bh 1 661,675 661,675 26,600 26,600


- Gate Valve 25 mm bh 1 249,375 249,375 16,625 16,625
- Gate Valve 15 mm bh 1 129,675 129,675 9,975 9,975
- FCO (Floor Clean Out) 50 mm bh 2 182,875 365,750 33,250 66,500
- Floor Drain 40 mm (Toilet Disable) bh 1 259,350 259,350 26,600 26,600
Material Bantu lot 1 665,000 665,000 0

c Pemipaan Air Kotoran, Bekas, Buangan Dapur, Vent

Pengadaan dan pemasangan pipa AKN, ABK, ABD, VT bahan pipa PVC class AW, lengkap terpasang dengan
alat bantu dan accessories lain yang diperlukan sesuai dengan gambar perencanaan & spesifikasi teknis.

- Pipa AK 100 mm (Riser) m 5.0 85,785 428,925 49,875 249,375


- Pipa AK 100 mm m 15 85,785 1,286,775 49,875 748,125
- Pipa AK 100 mm (Toilet Disable) m 4 85,785 343,140 49,875 199,500
- Pipa ABK 80 mm (Riser) m 5.0 51,870 259,350 39,900 199,500
- Pipa ABK 50 mm m 24 26,268 630,420 24,938 598,500
- Pipa ABK 40 mm (Toilet Disable) m 4 20,615 82,460 19,950 79,800
- Pipa ABK 40 mm (Coffe Max) m 4 20,615 82,460 19,950 79,800
- Pipa ABKL 50 mm (Riser) m 5.0 26,268 131,338 24,938 124,688
- Pipa ABKL 50 mm m 9 26,268 236,408 24,938 224,438
- Pipa Vent 50 mm (Riser) m 4 26,268 105,070 24,938 99,750
- Pipa Vent 50 mm (Toilet Disable) m 7 26,268 183,873 24,938 174,563
- Pipa Vent 32 mm m 15 17,955 269,325 15,960 239,400
- Pipa Vent 32 mm (Coffe Max) m 6 17,955 107,730 15,960 95,760
Material Bantu + Fitting lot 1 665,000 665,000 -

d Pemipaan Air Hujan

Pengadaan dan pemasangan pipa Air Hujan bahan pipa PVC class AW, lengkap terpasang dengan alat bantu
dan accessories lain yang diperlukan sesuai dengan gambar perencanaan & spesifikasi teknis.

- Pipa PAH 100 mm (ke Saluran Luar) m 6 85,785 514,710 49,875 299,250
- Pipa PAH 100 mm (Riser) m 18 85,785 1,544,130 49,875 897,750
Material Bantu + Fitting lot 1 332,500 332,500 -

Sub Total - B.1

B.2 Lantai 2
a Pemipaan Air Bersih

Pengadaan dan pemasangan Air Bersih bahan pipa PPR PN 10, lengkap terpasang dengan alat bantu dan
accessories lain yang diperlukan sesuai dengan gambar perencanaan & spesifikasi teknis.

- Pipa AB PPR 40 mm (Riser) m 4 77,805 311,220 53,200 212,800


- Pipa AB PPR 40 mm m 8 77,805 622,440 53,200 425,600
- Pipa AB PPR 32 mm m 21 65,835 1,382,535 42,560 893,760
- Pipa AB PPR 25 mm m 3 43,225 129,675 33,250 99,750
- Pipa AB PPR 20 mm m 4 32,585 130,340 26,600 106,400
- Pipa AB PPR 20 mm (Toilet) m 6 32,585 195,510 26,600 159,600
- Pipa AB PPR 20 mm (Staff Toilet) m 7 32,585 228,095 26,600 186,200
- Pipa AB PPR 15 mm m 5 27,265 136,325 19,950 99,750
- Pipa AB PPR 15 mm (Lab.) m 7 27,265 190,855 19,950 139,650
Material + Fitting lot 1 665,000 665,000 -

b Valve-Valve

Pengadaan dan pemasangan Valve-valve, lengkap terpasang dengan alat bantu dan accessories lain yang
diperlukan sesuai dengan gambar perencanaan & spesifikasi teknis.

- Gate Valve 25 mm bh 2 249,375 498,750 16,625 33,250


- Gate Valve 20 mm bh 2 149,625 299,250 13,300 26,600
- Gate Valve 15 mm bh 3 129,675 389,025 9,975 29,925
- FCO (Floor Clean Out) 100 mm (Toilet) bh 1 365,750 365,750 66,500 66,500
- FCO (Floor Clean Out) 100 mm (Staff Toilet) bh 1 365,750 365,750 66,500 66,500
- FCO (Floor Clean Out) 50 mm (Lab.) bh 1 182,875 182,875 33,250 33,250
- FCO (Floor Clean Out) 40 mm (Toilet) bh 1 149,625 149,625 26,600 26,600
- FCO (Floor Clean Out) 40 mm (Staff Toilet) bh 1 149,625 149,625 26,600 26,600
- Floor Drain 40 mm (Toilet) bh 1 259,350 259,350 26,600 26,600
- Floor Drain 40 mm (Staff Toilet) bh 1 259,350 259,350 26,600 26,600
Material Bantu lot 1 665,000 665,000

c Pemipaan Air Kotoran, Bekas, Buangan Dapur, Vent

Pengadaan dan pemasangan pipa AKN, ABK, ABD, VT bahan pipa PVC class AW, lengkap terpasang dengan
alat bantu dan accessories lain yang diperlukan sesuai dengan gambar perencanaan & spesifikasi teknis.

- Pipa AK 100 mm (Riser) m 4 85,785 343,140 49,875 199,500


- Pipa AK 100 mm m 24 85,785 2,058,840 49,875 1,197,000
- Pipa AK 100 mm (Toilet) m 3.0 85,785 257,355 49,875 149,625
- Pipa AK 100 mm (Staff Toilet) m 3.0 85,785 257,355 49,875 149,625
- Pipa ABK 80 mm (Riser) m 4 51,870 207,480 39,900 159,600
- Pipa ABK 80 mm m 22 51,870 1,141,140 39,900 877,800
- Pipa ABK 50 mm m 11 26,268 288,943 24,938 274,313
- Pipa ABK 40 mm m 11 20,615 226,765 19,950 219,450
- Pipa ABK 40 mm (Toilet) m 3.0 20,615 61,845 19,950 59,850
- Pipa ABK 40 mm (Staff Toilet) m 3.0 20,615 61,845 19,950 59,850
- Pipa ABKL 50 mm (Riser) m 4 26,268 105,070 24,938 99,750
- Pipa ABKL 50 mm m 15 26,268 394,013 24,938 374,063

RAB-MEP (PL) 6
PROYEK : EMC CLINIC, CIANJUR
SUBYEK : RENCANA ANGGARAN BIAYA PEKERJAAN PLUMBING
TANGGAL : FEBRUARI, 2016
DISIAPKAN OLEH : PT. MEKA Optima Consultant

Harga Satuan Total Harga Harga Satuan Total Harga


NO. URAIAN PEKERJAAN SAT. VOL.
Material ( Rp. ) Material ( Rp. ) Upah ( Rp. ) Upah ( Rp. )

- Pipa ABKL 50 mm (Lab.) m 3.0 26,268 78,803 24,938 74,813


- Pipa Vent 50 mm (Riser) m 4 26,268 105,070 24,938 99,750
- Pipa Vent 50 mm m 6 26,268 157,605 24,938 149,625
- Pipa Vent 50 mm (Toilet) m 7 26,268 183,873 24,938 174,563
- Pipa Vent 50 mm (Staff Toilet) m 7 26,268 183,873 24,938 174,563
- Pipa Vent 40 mm m 4 20,615 82,460 19,950 79,800
- Pipa Vent 32 mm m 8 17,955 143,640 15,960 127,680
- Pipa Vent 32 mm (Lab.) m 7 17,955 125,685 15,960 111,720
- Pipa Vent 25 mm m 16 11,970 191,520 12,303 196,840
Material Bantu + Fitting lot 1 665,000 665,000 -
d Pemipaan Air Hujan

Pengadaan dan pemasangan pipa Air Hujan bahan pipa PVC class AW, lengkap terpasang dengan alat bantu
dan accessories lain yang diperlukan sesuai dengan gambar perencanaan & spesifikasi teknis.

- Pipa PAH 100 mm (Riser) m 16 85,785 1,372,560 49,875 798,000


Material Bantu + Fitting lot 1 665,000 665,000

Sub Total - B.2

B.3 Lantai Atap

a Vent Cup & Roof Drain

Pengadaan dan pemasangan Vent Cup & Roof Drain, lengkap terpasang dengan alat bantu dan accessories
lain yang diperlukan sesuai dengan gambar perencanaan & spesifikasi teknis.

- Vent Cup 50 mm bh 1 49,875 49,875 16,625 16,625


- Roof Drain 100 mm (Dak Atap) bh 4 209,475 837,900 33,250 133,000
Material Bantu lot 1 332,500 332,500

b Pemipaan Air Kotoran, Bekas, Buangan Dapur, Vent

Pengadaan dan pemasangan pipa AKN, ABK, ABD, VT bahan pipa PVC class AW, lengkap terpasang dengan
alat bantu dan accessories lain yang diperlukan sesuai dengan gambar perencanaan & spesifikasi teknis.

- Pipa Vent 50 mm (Riser) m 2 26,268 52,535 24,938 49,875


Material Bantu + Fitting lot 1 166,250 166,250 -

c Pemipaan Air Hujan

Pengadaan dan pemasangan pipa Air Hujan bahan pipa PVC class AW, lengkap terpasang dengan alat bantu
dan accessories lain yang diperlukan sesuai dengan gambar perencanaan & spesifikasi teknis.

- Pipa PAH 100 mm m 5 85,785 428,925 49,875 249,375


Material Bantu + Fitting lot 1 665,000 665,000

Sub Total - B.3

Sub Total - B (B.1 s/d B.3)

C. Pekerjaan Elektrikal Plumbing

Pekerjaan Instalasi Elektrikal Plumbing

C.1
Pengadaan dan pemasangan Instalasi Elektrikal Plambing, lengkap terpasang dengan alat bantu dan
accessories lain yang diperlukan sesuai dengan gambar perencanaan & spesifikasi teknis.

C.2 LCP-BP
a Pompa - BP.01A NYM 4 x 4 mm m 8 37,905 303,240 9,975 79,800
b Pompa - BP.01B Stand By NYM 4 x 4 mm m 8 37,905 303,240 9,975 79,800
c Pompa Jet Pum NYM 3 x 2,5 mm m 20 19,285 385,700 4,988 99,750

C.3 - Kabel Control-level switch ,dll. lot 1 997,500 997,500 99,750 99,750

Sub Total - C

D. Testing & Commissioning lot 1 3,325,000 3,325,000 3,325,000 3,325,000

Sub Total - D

TOTAL PEKERJAAN PLUMBING 112,692,790 24,231,795

RAB-MEP (PL) 7
PROYEK : EMC CLINIC, CIANJUR
SUBYEK : RENCANA ANGGARAN BIAYA PEKERJAAN PENANGKAL PETIR
TANGGAL : FEBRUARI, 2016
DISIAPKAN OLEH : PT. MEKA Optima Consultant

Harga Satuan Total Harga Harga Satuan Total Harga


NO. URAIAN PEKERJAAN SAT. VOL.
Material ( Rp. ) Material ( Rp. ) Upah ( Rp. ) Upah ( Rp. )

II. PEKERJAAN PENANGKAL PETIR

A. Peralatan Utama

Pengadaan dan pemasangan peralatan utama Penangkal Petir, lengkap terpasang


dengan alat bantu dan accessories lain yang diperlukan sesuai dengan gambar
perencanaan & spesifikasi teknis.

1 unit 5 437,500 2,187,500 35,000 175,000


Air Terminal Type Konvensional Air Rod 5/8" Panjang 1.000 mm (Copper Bar), lengkap
terpasang diatas atap bangunan tertinggi.
2 Kabel Penghantar BC X 70 mm + pipa Pvc 32 mm m 55 108,500 5,967,500 10,500 577,500
3 Bak kontrol dengan ukuran 40 x 40 X 40 cm, Cover unit 1 1,050,000 1,050,000 105,000 105,000
4 Grounding, Bc 70 mm & coper rod / pentanahan; (Tahanan max 2 Ohm) unit 2 2,100,000 4,200,000 350,000 700,000
5 Ijin Depnaker Setempat lot 1 7,000,000 7,000,000

Sub Total - A

B Testing & Commissioning lot 1 2,800,000 2,800,000 2,800,000 2,800,000

Sub Total - B

TOTAL PEKERJAAN PENANGKAL PETIR 16,205,000 11,357,500

RAB-MEP (EL) 8
PROYEK : EMC CLINIC, CIANJUR
SUBYEK : RENCANA ANGGARAN BIAYA PEKERJAAN ELEKTRIKAL
TANGGAL : FEBRUARI, 2016
DISIAPKAN OLEH : PT. MEKA Optima Consultant

Harga Satuan Total Harga Harga Satuan Total Harga


NO. URAIAN PEKERJAAN SAT. VOL.
Material ( Rp. ) Material ( Rp. ) Upah ( Rp. ) Upah ( Rp. )

I. PEKERJAAN ELEKTRIKAL

A. Peralatan Utama

Pengadaan dan pemasangan peralatan utama Elektrikal, lengkap terpasang dengan alat bantu
dan accessories lain yang diperlukan sesuai dengan gambar perencanaan & spesifikasi teknis.

A.1 Panel-Panel

1 MVMDP - 20 KV unit 1 179,550,000 179,550,000 9,975,000 9,975,000


2 Trafo Kapasitas 500 KVA, 20 KV/380 V/3 Ph/20 Hz unit 1 99,750,000 99,750,000 9,975,000 9,975,000
3 LVMDP + Cap. Bank 200 KVAR unit 1 379,050,000 379,050,000 16,625,000 16,625,000
4 SDP KLINIK unit 1 51,870,000 51,870,000 6,650,000 6,650,000
5 PP-ELC unit 1 13,965,000 13,965,000 3,325,000 3,325,000
6 PP-GR unit 1 13,965,000 13,965,000 3,325,000 3,325,000
7 PP-2 unit 1 13,965,000 13,965,000 3,325,000 3,325,000
8 LP-GR unit 1 11,172,000 11,172,000 1,995,000 1,995,000
9 LP-2 unit 1 11,172,000 11,172,000 1,995,000 1,995,000
10 PP-MRI unit 1 13,965,000 13,965,000 3,325,000 3,325,000
11 PP-CT unit 1 13,965,000 13,965,000 3,325,000 3,325,000
12 PP-X RAY unit 1 13,965,000 13,965,000 3,325,000 3,325,000
13 PP-MAMMO unit 1 13,965,000 13,965,000 3,325,000 3,325,000
14 PP-LAB unit 1 13,965,000 13,965,000 3,325,000 3,325,000
15 PP-UTILITY unit 1 13,965,000 13,965,000 3,325,000 3,325,000
16 LCP-PUMP unit 1 13,965,000 13,965,000 3,325,000 3,325,000
17 FB-X RAY unit 1 11,172,000 11,172,000 1,995,000 1,995,000
18 FB-CT unit 1 11,172,000 11,172,000 1,995,000 1,995,000
19 FB-USG unit 1 11,172,000 11,172,000 1,995,000 1,995,000
20 Power Surge Arester + Grounding System (Panel MVMDP) max 2 ohm; (BC 95 mm) unit 1 7,980,000 7,980,000 1,662,500 1,662,500
21 Power Surge Arester + Grounding System (Panel LVMDP) max 2 ohm; (BC 95 mm) unit 1 7,980,000 7,980,000 1,662,500 1,662,500
22 Power Surge Arester + Grounding System (Trafo) max 2 ohm; (BC 95 mm) unit 1 7,980,000 7,980,000 1,662,500 1,662,500
23 Power Surge Arester + Grounding System (Netral Trafo) max 2 ohm; (BC 95 mm) unit 1 7,980,000 7,980,000 1,662,500 1,662,500

Sub Total - A

B. Pekerjaan Kabel Feeder

Pengadaan dan pemasangan Kabel Feeder, lengkap terpasang dengan alat bantu dan
accessories lain yang diperlukan sesuai dengan gambar perencanaan & spesifikasi teknis.

B.1 Penarikan kabel feeder dari Gardu PLN ke :


1 MVMDP Incoming N2XSEGbY 3 x 70 mm m BY OTHERS
B.2 Dari MVMDP Out Going ke:
1 Trafo NA2XSY 3 x 1c x 70 mm m 9 246,050 2,214,450 24,605 221,445
B.3 Dari Trafo ke:
1 LVMDP NAYY 2(4 x 1C x 300mm) + BC 95mm (all) m 9 1,313,375 11,820,375 142,975 1,286,775
B.4 Dari unit Genset ke :
1 LVMDP NAYY 2(4 x 1C x 300mm) + BC 95mm (all) m 11 1,313,375 14,184,450 142,975 1,544,130
B.5 Dari LVMDP ke :
1 PP-GR NYFGBY 4 x 35 mm + BC 25 mm m 57 392,350 22,363,950 39,235 2,236,395
2 PP-2 NYFGBY 4 x 25 mm + BC 16 mm m 92 329,175 30,284,100 32,918 3,028,410
3 SDP-KLINIK NYFGBY 2(4 x 150 mm) + BC 95 mm m 56 1,722,350 96,451,600 172,235 9,645,160
4 PP-ELC NYFGBY 4 X 4 mm + BC 4 mm m 109 104,405 11,380,145 10,441 1,138,015
5 PP-UTILITY NYY 4 x 4 mm + BC 4 mm m 7 63,175 442,225 6,318 44,223

B.6 Dari SDP-KLINIK ke :


1 PP-X RAY NAYY 4 x 120mm + BC 50 mm m 24 673,313 16,159,500 111,720 2,681,280
2 PP-CT NAYY 4 x 120 mm + BC 50 mm m 17 673,313 11,446,313 111,720 1,899,240
3 PP-MRI NAYY 4 x 185 mm + BC 70 mm m 24 1,256,850 30,164,400 209,475 5,027,400
4 PP-MAMMO NAYY 4 x 16 mm + BC 16 mm m 45 112,219 5,049,844 18,703 841,641

B.7 Dari PP-GR ke :


1 LP-GR NYY4 x 4 mm + BC 4 mm m 4 63,175 252,700 6,318 25,270
2 FB-MAX COFFE NYY 4 x 4 mm + BC 4 mm m 15 63,175 947,625 6,318 94,763
3 FAF-G.1 NYM 3 x 2,5 mm m 20.0 18,321 366,415 4,988 99,750
4 EF-G.1 NYM 3 x 2,5 mm m 15.0 18,321 274,811 4,988 74,813
5 IU/OU G.1 NYM 4 x 4 mm + BC 4 mm m 19.0 60,016 1,140,309 6,318 120,033
6 IU/OU G.2 NYM 4 x 4 mm + BC 4 mm m 14.0 60,016 840,228 6,318 88,445
7 IU/OU G.3 NYM 4 x 4 mm + BC 4 mm m 14.0 60,016 840,228 6,318 88,445
8 IU/OU G.4 NYM 4 x 4 mm + BC 4 mm m 14.0 60,016 840,228 6,318 88,445
9 IU/OU G.5 NYM 4 x 4 mm + BC 4 mm m 45.0 60,016 2,700,731 6,318 284,288
10 IU/OU G.6 NYM 4 x 4 mm + BC 4 mm m 33.0 60,016 1,980,536 6,318 208,478
11 IU/OU G.7 NYM 4 x 4 mm + BC 4 mm m 45.0 60,016 2,700,731 6,318 284,288

B.8 Dari PP-2 ke :


1 LP-2 NYY 4 x 4 mm + BC 4 mm m 4 63,175 252,700 6,318 25,270
2 PP-LAB NYY 4 x 4 mm + BC 4 mm m 17 63,175 1,073,975 6,318 107,398
3 EF-2.1 NYM 3 x 2,5 mm m 28 18,321 512,981 4,988 139,650
4 EF-2.2 NYM 3 x 2,5 mm m 17 18,321 311,453 4,988 84,788
5 EF-2.3 NYM 3 x 2,5 mm m 18 18,321 329,774 4,988 89,775
6 IU/OU 2.14 NYM 4 x 4 mm + BC 4 mm m 29 60,016 1,740,471 6,318 183,208

B.9 Dari LP-GR ke :


1 FB-X RAY NYY 4 x 4 mm + BC 4 mm m 18 63,175 1,137,150 6,318 113,715
2 FB-CT NYY 4 x 4 mm + BC 4 mm m 13 63,175 821,275 6,318 82,128

B.10 Dari LP-2 ke :

1 FB-USG NYY 4 x 4 mm + BC 4 mm m 15 63,175 947,625 6,318 94,763

B.11 Dari PP-UTILITY ke :


1 LCP-BP NYY 4 x 4 mm+BC 4mm m 23 63,175 1,453,025 6,318 145,303
2 EF-G.1 NYM 3 x 2,5 mm m 12 18,321 219,849 4,988 59,850
3 EF-G.2 NYM 3 x 2,5 mm m 13 18,321 238,170 4,988 64,838
4 EF-2.1 NYM 3 x 2,5 mm m 17 18,321 311,453 4,988 84,788
5 EF-2.2 NYM 3 x 2,5 mm m 17 18,321 311,453 4,988 84,788

Sub Total - B
RAB-MEP (EL) 9
PROYEK : EMC CLINIC, CIANJUR
SUBYEK : RENCANA ANGGARAN BIAYA PEKERJAAN ELEKTRIKAL
TANGGAL : FEBRUARI, 2016
DISIAPKAN OLEH : PT. MEKA Optima Consultant

Harga Satuan Total Harga Harga Satuan Total Harga


NO. URAIAN PEKERJAAN SAT. VOL.
Material ( Rp. ) Material ( Rp. ) Upah ( Rp. ) Upah ( Rp. )

C. Peralatan Instalasi

Pengadaan dan pemasangan peralatan Instalasi Penerangan & Stop Kontak, lengkap terpasang
dengan alat bantu dan accessories lain yang diperlukan sesuai dengan gambar perencanaan &
spesifikasi teknis.

C.1 Ruang UTILITY


1 Lampu TL Led 2x18 watt 3000K, c/w Battery bh 1 1,051,500 1,051,500 52,500 52,500
2 Led Wall Lamp 7 Watt bh 4 542,500 2,170,000 35,000 140,000
3 Sakelar tunggal bh 1 31,500 31,500 3,500 3,500
4 Sakelar Seri bh 1 38,500 38,500 3,500 3,500
5 Stop Kontak 1, 10 A, 200 Watt bh 1 31,500 31,500 3,500 3,500
6 Instalasi Stop Kontak NYA 3 x 2,5 mm (in PVC Cond H.I 20 mm) ttk 1 169,500 169,500 45,500 45,500
7 Instalasi Penerangan NYA 3 x 2,5 mm (in PVC Cond H.I 20 mm) ttk 5 118,500 592,500 45,500 227,500

C.2 Lantai GR
1 Led Spot Light 5,5 watt, warm White bh 54 122,500 6,615,000 45,500 2,457,000
2 Led Spot Light 5,5 watt, warm White, c/w Battery bh 8 675,500 5,404,000 45,500 364,000
3 Led Strip Light 14 watt/M m 30 38,500 1,155,000 3,500 105,000
4 Lampu Taman Type Bollar Mercury 1x40 Watt bh 4 262,500 1,050,000 73,500 294,000
5 Exit Led 3 Watt ; c/w Battery bh 2 735,000 1,470,000 45,500 91,000
6 Saklar tunggal bh 4 31,500 126,000 3,500 14,000
7 Saklar Seri bh 4 38,500 154,000 3,500 14,000
8 Grid switch 16 Gang bh 1 315,000 315,000 3,500 3,500
9 Stop Kontak 1, 10 A, 200 Watt bh 19 31,500 598,500 3,500 66,500
10 Stop Kontak AC 1, 10 A, 1000 Watt; w/Plug bh 1 66,500 66,500 3,500 3,500
11 Instalasi Stop Kontak NYA 3 x 2,5 mm (in PVC Cond H.I 20 mm) ttk 19 169,500 3,220,500 45,500 864,500
12 Instalasi Penerangan NYA 3 x 2,5 mm (in PVC Cond H.I 20 mm) ttk 98 118,500 11,613,000 45,500 4,459,000

Ruang X RAY & CT SCAN


1 Led Spot Light 5,5 watt, warm White bh 19 122,500 2,327,500 45,500 864,500
2 Led Spot Light 5,5 watt, warm White, c/w Battery bh 2 675,500 1,351,000 45,500 91,000
3 Led Strip Light 14 watt/M m 33 38,500 1,270,500 3,500 115,500
4 Stop Kontak 1, 10 A, 200 Watt bh 15 31,500 472,500 3,500 52,500
5 Instalasi Stop Kontak NYA 3 x 2,5 mm (in PVC Cond H.I 20 mm) ttk 15 169,500 2,542,500 45,500 682,500
6 Instalasi Penerangan NYA 3 x 2,5 mm (in PVC Cond H.I 20 mm) ttk 54 118,500 6,399,000 45,500 2,457,000

C.3 Lantai 2
1 Led Spot Light 5,5 watt, warm White bh 67 122,500 8,207,500 45,500 3,048,500
2 Led Spot Light 5,5 watt, warm White, c/w Battery bh 12 675,500 8,106,000 45,500 546,000
3 Led Strip Light 14 watt/M m 21 38,500 808,500 3,500 73,500
4 Exit Led 3 Watt ; c/w Battery bh 1 735,000 735,000 45,500 45,500
5 Saklar tunggal bh 7 31,500 220,500 3,500 24,500
6 Saklar Seri bh 12 38,500 462,000 3,500 42,000
7 Grid switch 12 Gang bh 1 280,000 280,000 3,500 3,500
8 Stop Kontak 1, 10 A, 200 Watt bh 43 31,500 1,354,500 3,500 150,500
9 Stop Kontak AC 1, 10 A, 1000 Watt; w/Plug bh 13 66,500 864,500 3,500 45,500
10 Instalasi Stop Kontak NYA 3 x 2,5 mm (in PVC Cond H.I 20 mm) ttk 43 169,500 7,288,500 45,500 1,956,500
11 Instalasi Stop Kontak AC NYA 3 x 2,5 mm (in PVC Cond H.I 20 mm) ttk 14 215,500 3,017,000 45,500 637,000
12 Instalasi Penerangan NYA 3 x 2,5 mm (in PVC Cond H.I 20 mm) ttk 101 118,500 11,968,500 45,500 4,595,500

Ruang USG, MAMMO, ELC & LAB


1 Led Spot Light 5,5 watt, warm White bh 25 122,500 3,062,500 45,500 1,137,500
2 Led Spot Light 5,5 watt, warm White, c/w Battery bh 4 675,500 2,702,000 45,500 182,000
3 Stop Kontak 1, 10 A, 200 Watt bh 30 31,500 945,000 3,500 105,000
4 Instalasi Stop Kontak NYA 3 x 2,5 mm (in PVC Cond H.I 20 mm) ttk 30 169,500 5,085,000 45,500 1,365,000
5 Instalasi Penerangan NYA 3 x 2,5 mm (in PVC Cond H.I 20 mm) ttk 29 118,500 3,436,500 45,500 1,319,500

Sub Total - C(C.1 s/d C.3)

D. Pekerjaan Kabel kabel leadder & Kabel Tray

Pengadaan dan pemasangan Kabel Elektrikal Arus kuat, lengkap terpasang dengan alat bantu
dan accessories lain yang diperlukan sesuai gambar perencanaan & spesifikasi teknis.

D.1 Pekerjaan Kabel Leadder


1 Lantai GR
a Kabel Leadder 200x100mm m 52 189,000 9,828,000 14,000 728,000
b Material Bantu + Fitting lot 1 2,800,000 2,800,000 700,000 700,000

2 Lantai 2
a Kabel Leadder 200x100mm m 26 189,000 4,914,000 14,000 364,000
b Material Bantu + Fitting lot 1 2,800,000 2,800,000 700,000 700,000

D.2 Pekerjaan Kabel Leadder ( Riser )


a Kabel Leadder 200x100mm m 9 189,000 1,701,000 14,000 126,000
b Material Bantu + Fitting lot 1 2,800,000 2,800,000 700,000 700,000

Sub Total - D

E Testing & Commissioning lot 1 3,500,000 3,500,000 3,500,000 3,500,000

Sub Total - E

TOTAL PEKERJAAN ELEKTRIKAL 1,349,279,245 161,081,885

RAB-MEP (EL) 10
PROYEK : EMC CLINIC, CIANJUR
SUBYEK : RENCANA ANGGARAN BIAYA PEKERJAAN FIRE ALARM
TANGGAL : FEBRUARI, 2016
DISIAPKAN OLEH : PT. MEKA Optima Consultant

Harga Satuan Total Harga Harga Satuan Total Harga


NO. URAIAN PEKERJAAN SAT. VOL.
Material ( Rp. ) Material ( Rp. ) Upah ( Rp. ) Upah ( Rp. )

III. PEKERJAAN ELEKTRONIK

III.3 PEKERJAAN FIRE ALARM

A. PERALATAN UTAMA FIRE ALARM

Pengadaan dan pemasangan Peralatan Utama Fire Alarm, lengkap terpasang dengan alat
bantu dan accessories lain yang diperlukan sesuai gambar perencanaan & spesifikasi teknis.

1 MCP-FA Semi Addressable C/W monitor, printer , Back Up Battere 10 menit, grounding & unit 1 48,500,000 48,500,000 70,000 70,000
surge arester (Smart System)
2 MDF-FA 1 Loop unit 1 19,000,000 19,000,000 70,000 70,000

Sub Total - A

B. Pekerjaan Instalasi Fire Alarm

Pengadaan dan pemasangan Instalasi Fire Alarm, lengkap terpasang dengan alat bantu dan
accessories lain yang diperlukan sesuai gambar perencanaan & spesifikasi teknis.

B.1 Lantai GR

1 Smoke Detector (Photoelectric) bh 8 507,500 4,060,000 17,500 140,000


2 Manual Alarm Push Button bh 1 175,000 175,000 17,500 17,500
3 Alarm Bell bh 1 245,000 245,000 17,500 17,500
4 Alarm Indicator Lamp bh 1 80,500 80,500 17,500 17,500
5 End Of Line bh 1 include
6 Instalasi Detector NYA 2 x 1,5 mm (in PVC Cond. H.I 20 mm) ttk 8 129,000 1,032,000 45,500 364,000
7 Instalasi Manual Alarm Push Button NYA 2 x 1,5 mm (in PVC Cond. H.I 20 mm) ttk 1 193,500 193,500 45,500 45,500
8 Instalasi Alarm Bell NYA 2 x 1,5 mm (in PVC Cond. H.I 20 mm) ttk 1 193,500 193,500 45,500 45,500
9 Instalasi Alarm Indicator Lamp NYA 2 x 1,5 mm (in PVC Cond. H.I 20 mm) ttk 1 193,500 193,500 45,500 45,500
10 Fire Extinguisher 3 Kg (Dry Chemical) lengkap dengan bok kaca Unit 2 654,500 1,309,000 35,000 70,000

B.2 Lantai 2
1 Smoke Detector (Photoelectric) bh 15 507,500 7,612,500 17,500 262,500
2 Manual Alarm Push Button bh 1 175,000 175,000 17,500 17,500
3 Alarm Bell bh 1 245,000 245,000 17,500 17,500
4 Alarm Indicator Lamp bh 1 80,500 80,500 17,500 17,500
5 End Of Line bh 1 include
6 TBFA (Terminal Box Fire Alarm) w/ Module unit 1 12,250,000 12,250,000 35,000 35,000
7 Instalasi Detector NYA 2 x 1,5 mm (in PVC Cond. H.I 20 mm) ttk 15 129,000 1,935,000 45,500 682,500
8 Instalasi Manual Alarm Push Button NYA 2 x 1,5 mm (in PVC Cond. H.I 20 mm) ttk 1 193,500 193,500 45,500 45,500
9 Instalasi Alarm Bell NYA 2 x 1,5 mm (in PVC Cond. H.I 20 mm) ttk 1 193,500 193,500 45,500 45,500
10 Instalasi Alarm Indicator Lamp NYA 2 x 1,5 mm (in PVC Cond. H.I 20 mm) ttk 1 193,500 193,500 45,500 45,500
11 Fire Extinguisher 3 Kg (Dry Chemical) lengkap dengan bok kaca Unit 2 654,500 1,309,000 35,000 70,000

Sub Total - B.1 & B.2

C. Pengkabelan

Pengadaan dan pemasangan Kabel feeder, lengkap terpasang dengan alat bantu dan
accessories lain yang diperlukan sesuai gambar perencanaan & spesifikasi teknis.

C.1 Penarikan Kabel feeder Riser :

a. LOOP - 1

1 Dari MD-FA ke TB-FA-2


- 2 Pair Twisted Shielded AWG 18 (in PVC Cond H.I 20 mm); kabel Loop In m 5 17,500 87,500 7,000 35,000
- FRC 3 x 2,5 mm (in PVC Cond H.I 20 mm) m 5 24,500 122,500 7,000 35,000
- ITC 2 x 0,6 mm (in PVC Cond H.I 20 mm) m 5 10,500 52,500 7,000 35,000

2 Dari TB-FA-2 ke MD-FA


- 2 Pair Twisted Shielded AWG 18 (in PVC Cond H.I 20 mm); kabel Loop Out m 5 17,500 87,500 7,000 35,000

Sub Total - C

D. Testing & Commissioning lot 1 2,800,000 2,800,000 2,800,000 2,800,000

Sub Total - D

TOTAL PEKERJAAN FIRE ALARM 102,319,500 5,082,000

RAB-MEP (Fire Alarm) 11


PROYEK : EMC CLINIC, CIANJUR
SUBYEK : RENCANA ANGGARAN BIAYA PEKERJAAN TV
TANGGAL : FEBRUARI, 2016
DISIAPKAN OLEH : PT MEKA Optima Consultant

Harga Satuan Total Harga Harga Satuan Total Harga


NO. URAIAN PEKERJAAN SAT. VOL.
Material ( Rp. ) Material ( Rp. ) Upah ( Rp. ) Upah ( Rp. )

III. PEKERJAAN ELEKTRONIK

III.2 PEKERJAAN TV

A. PERALATAN UTAMA TV

Pengadaan dan pemasangan Peralatan Utama TV, lengkap terpasang dengan alat bantu
dan accessories yang diperlukan sesuai dengan gambar perencanaan dan spesifikasi
teknis.

1 UHF Antenna unit 2 2,625,000 5,250,000 140,000 280,000


2 Boster w/ Protection unit 1 1,260,000 1,260,000 31,500 31,500

Sub Total - A

B. Pekerjaan Instalasi TV

Pengadaan dan pemasangan Instalasi TV, lengkap terpasang dengan alat bantu dan
accessories yang diperlukan sesuai dengan gambar perencanaan dan spesifikasi teknis.

1 Penarikan kabel dari Peralatan Utama ke :

a Antena UHF Coaxial Cable 7C - 2V 75 ohm (PVC Cond. 20) m 40 15,750 625,275 7,000 277,900
b Antena UHF Coaxial Cable 7C - 2V 75 ohm (PVC Cond. 20) m 40 15,750 625,275 7,000 277,900

Sub Total - B

C. Pekerjaan Instalasi TV & Ficture

Pengadaan dan pemasangan Instalasi TV & Ficture, lengkap terpasang dengan alat bantu
dan accessories yang diperlukan sesuai dengan gambar perencanaan dan spesifikasi
teknis.

C.1 Lantai GR

1 Outlet TV bh 1 59,500 59,500 7,000 7,000

Sub Total - C.1

C.2 Lantai 2

1 Outlet TV bh 1 59,500 59,500 7,000 7,000

Sub Total - C.2

Sub Total - C.1 & C.2

D. Testing & Commissioning lot 1 2,800,000 2,800,000 2,800,000 2,800,000

Sub Total - D

TOTAL PEKERJAAN TV 10,679,550 3,681,300

RAB-MEP (MATV) 12
PROYEK : EMC CLINIC, CIANJUR
SUBYEK : RENCANA ANGGARAN BIAYA PEKERJAAN CCTV
TANGGAL : FEBRUARI, 2016
DISIAPKAN OLEH : PT. MEKA Optima Consultant

Harga Satuan Total Harga Harga Satuan Total Harga


NO. URAIAN PEKERJAAN SAT. VOL.
Material ( Rp. ) Material ( Rp. ) Upah ( Rp. ) Upah ( Rp. )

III. PEKERJAAN ELEKTRONIK

III.4 PEKERJAAN CCTV

A. Peralatan Utama CCTV

Pengadaan dan pemasangan peralatan utama CCTV, lengkap terpasang dengan alat bantu dan
accessories lain yang diperlukan sesuai dengan gambar perencanaan & spesifikasi teknis.

1 Digital Multiplexer Recorder 16 Channel unit 1 16,749,330 16,749,330 350,000 350,000


2 Monitor LCD Multi Screen 19" Inch 16 Channel unit 1 3,500,000 3,500,000 70,000 70,000

Sub Total - A

B. Pekerjaan Instalasi CCTV

Pengadaan dan pemasangan Instalasi CCTV, lengkap terpasang dengan alat bantu dan accessories
lain yang diperlukan sesuai dengan gambar perencanaan & spesifikasi teknis.

B.1 Lantai GR

1 Camera CCTV (Fixed Dome) unit 6 1,925,000 11,550,000 24,500 147,000


2 Camera CCTV (Fixed type outdoor) unit 2 4,410,000 8,820,000 24,500 49,000
3 Instalasi Camera CCTV
-kabel Coaxial Cable 5C - 2V 75 ohm + Kabel Power NYM 2 X 1,5 mm; in (PVC Cond 20 mm) ttk 8 665,000 5,320,000 45,500 364,000

B.2 Lantai 2

1 Camera CCTV (Fixed Dome) unit 3 1,925,000 5,775,000 24,500 73,500


2 Instalasi Camera CCTV
-kabel Coaxial Cable 5C - 2V 75 ohm + Kabel Power NYM 2 X 1,5 mm; in (PVC Cond 20 mm) ttk 3 665,000 1,995,000 45,500 136,500

Sub Total - B.1 & B.2

C. Testing & Commissioning lot 1 2,800,000 2,800,000 2,800,000 2,800,000

Sub Total - D

TOTAL PEKERJAAN CCTV 56,509,330 3,990,000

RAB-MEP (CCTV) 13
PROYEK : EMC CLINIC, CIANJUR
SUBYEK : RENCANA ANGGARAN BIAYA PEKERJAAN LAN
TANGGAL : FEBRUARI, 2016
DISIAPKAN OLEH : PT. MEKA Optima Consultant

Harga Satuan Total Harga Harga Satuan Total Harga


NO. URAIAN PEKERJAAN SAT. VOL.
Material ( Rp. ) Material ( Rp. ) Upah ( Rp. ) Upah ( Rp. )

III. PEKERJAAN ELECTRONIK

III.5 PEKERJAAN LAN

A. Peralatan Utama LAN


Pengadaan dan pemasangan Peralatan Utama LAN, lengkap terpasang dengan alat Unit 1 by other
bantu dan accessories yang diperlukan sesuai gambar perencanaan dan spesifikasi
teknis.

Sub Total - A - -

B. Pekerjaan Instalasi Pengkabelan

Pengadaan dan pemasangan Instalasi kabel data, lengkap dengan alat bantu dan
accessoris lain yang diperlukan sesuai dengan gambar perencana dan spesifikasi
teknis.

B.1 Lantai GR

a Access point bh 1 875,000 875,000 35,000 35,000


b Outlet Data bh 8 87,500 700,000 7,000 56,000
c Instalasi data Cat 6 (4 x 2 x 0,6 mm) (in PVC Cond 20 mm) ttk 8 157,500 1,260,000 45,500 364,000
d Instalasi Access Point Cat 6 (4 x 2 x 0,6 mm) (in PVC Cond 20 mm) ttk 1 157,500 157,500 45,500 45,500

B.2 Lantai 2

a Access point bh 1 875,000 875,000 35,000 35,000


b Outlet Data bh 17 87,500 1,487,500 7,000 119,000
c Instalasi data Cat 6 (4 x 2 x 0,6 mm) (in PVC Cond 20 mm) ttk 17 157,500 2,677,500 45,500 773,500
d Instalasi Access Point Cat 6 (4 x 2 x 0,6 mm) (in PVC Cond 20 mm) ttk 1 157,500 157,500 45,500 45,500

Sub Total - B.1 & B.2

C. Pengkabelan

Pengadaan dan pemasangan Kabel Tuvur, lengkap terpasang dengan alat bantu dan
accessories lain yang diperlukan sesuai gambar perencanaan & spesifikasi teknis.

C.1 Penarikan Kabel dari Standing Rack Cabinet ke:

1 Rack Switch - 2 Cat 6 (4 x 2 x 0,6 mm) (in PVC Cond 20 mm) m 6 15,750 94,500 7,000 42,000

Sub Total - C

D. Testing & Commissioning lot 1 2,800,000 2,800,000 2,800,000 2,800,000

Sub Total - D

TOTAL PEKERJAAN LAN 11,084,500 4,315,500

RAB-MEP (LAN) 14
PROYEK : EMC CLINIC, CIANJUR
SUBYEK : RENCANA ANGGARAN BIAYA PEKERJAAN GENSET
TANGGAL : FEBRUARI, 2016
DISIAPKAN OLEH : PT. MEKA Optima Consultant

Harga Satuan Total Harga Harga Satuan Total Harga


NO. URAIAN PEKERJAAN SAT. VOL.
Material ( Rp. ) Material ( Rp. ) Upah ( Rp. ) Upah ( Rp. )

VI. PEKERJAAN GENSET

A. Peralatan Utama Genset

Pengadaan dan pemasangan Peralatan Utama Genset, lengkap terpasang dengan alat
bantu dan accessories lain yang diperlukan sesuai dengan gambar perencanaan &
spesifikasi teknis.

1 Genset Kapasitas 500KVA, 380 V/3 ph / 50 Hz ; (Type Silent) Loco on Pondation unit 1 - AK DI TAWARKAN - K DI TAWARKAN

Sub Total - A

B. Pengkabelan

Pengadaan dan pemasangan Kebel Feeder, lengkap terpasang dengan alat bantu dan
accessories lain yang diperlukan sesuai dengan gambar perencanaan & spesifikasi teknis.

B.1 Pentanahan body Genset dan PKG ttk 1 - AK DI TAWARKAN -


B.2 Pentanahan Netral Genset ttk 1 - AK DI TAWARKAN -
B.3 Kabel Kontrol,dll. lot 1 - AK DI TAWARKAN -
B.4 Perijinan ke Depnaker lot 1 - K DI TAWARKAN
B.5 Solar Pengetesan ltr 150 TIDAK DI TAWARKAN Include

Sub Total - B

C. Testing & Commissioning lot 1 - AK DI TAWARKAN - K DI TAWARKAN

Sub Total - C

TOTAL PEKERJAAN GENSET - -

RAB-MEP (Genset) 15
ELEKTRIKAL

INSTALASI PENERANGAN
Kabel NYA 3 x 1C x 2,5 mm2 5.00 m 18,500 92,500
PVC Conduit dia. 20 mm 5.00 m 4,000 20,000
Tee-Dus 1.00 bh 1,000 1,000
Klem PVC Conduit dia. 20 mm 2.00 bh 1,000 2,000
Sock PVC Conduit dia. 20 mm 1.00 bh 1,000 1,000
Material Bantu 1 lot 2,000 2,000
TOTAL 118,500

INSTALASI STOP KONTAK


Kabel NYA 3 x 1C x 2,5 mm2 7.00 m 18,500 129,500
PVC Conduit dia. 20 mm 7.00 m 4,000 28,000
Tee-Dus 2.00 bh 1,000 2,000
Klem PVC Conduit dia. 20 mm 4.00 bh 1,000 4,000
Sock PVC Conduit dia. 20 mm 2.00 bh 1,000 2,000
Material Bantu 1 lot 4,000 4,000
TOTAL 169,500

INSTALASI STOP KONTAK AC


Kabel NYA 3 x 1C x 2,5 mm2 9.00 m 18,500 166,500
PVC Conduit dia. 20 mm 9.00 m 4,000 36,000
Tee-Dus - bh 1,000 -
Klem PVC Conduit dia. 20 mm 6.00 bh 1,000 6,000
Sock PVC Conduit dia. 20 mm 3.00 bh 1,000 3,000
Material Bantu 1 lot 4,000 4,000
TOTAL 215,500

ELEKTRONIK

AHS Instalasi Detector Alarm VOL SATUAN MATERIAL TOTAL MAT.


Kabel NYA 2 x 1c x 1.5mm 10.00 m' 7,500 75,000
PVC Conduit dia. 20 mm 10.00 m 4,000 40,000
Tee-Dus 1.00 bh 1,000 1,000
Klem PVC Conduit dia. 20 mm 6.00 bh 1,000 6,000
Sock PVC Conduit dia. 20 mm 3.00 bh 1,000 3,000
Material Bantu 1 lot 4,000 4,000
TOTAL 129,000

AHS Instalasi Alarm Bell, Manual Push Button VOL SATUAN MATERIAL TOTAL MAT.
Kabel NYA 2 x 1c x 1.5mm 15.00 m' 7,500 112,500
PVC Conduit dia. 20 mm 15.00 m 4,000 60,000
Tee-Dus 2.00 bh 1,000 2,000
Klem PVC Conduit dia. 20 mm 10.00 bh 1,000 10,000
Sock PVC Conduit dia. 20 mm 5.00 bh 1,000 5,000
Material Bantu 1 lot 4,000 4,000
TOTAL 193,500
SPESIFIKASI MERK MATERIAL PROYEK EMC CIANJUR

NO ITEM MATERIAL MERK KONTRAKTOR

A HVAC

1 Unit AC LG, York, Fuji Air

2 Unit Fan CKE, KDK.

3 Pipa Drain PVC Wavin, Vinilon, Pralon.

4 Pipa Refrigerant Kembla, Trust

5 Isolasi Pipa Drain dan Refrigerant Insuflex, Armaflex

B PLUMBING

1 Unit Pompa Booster Ebara

2 Bioseptic System BioSeven

3 Pipa Air Kotor, Air Bekas, dan Vent (PVC) Wavin, Vinilon, Pralon.

4 Pipa Air Bersih (PPR) Westpex, SD, Genova.

5 Valves Kitz, Onda

6 Flexible Joint Muraflex, Thermosel.

7 Floor Drain Antasan, Kharisma.

C ELEKTRIKAL

1 Panel MVMDP Schneider, MG.

2 Transformator Trafindo

3 Generator Set Perkins

4 Panel - panel TR Intimuara, Rickstar.

5 Komponen Panel TR Schneider, Chint.

6 Kabel MVMDP Voksel, Kabelmetal, Kabelindo.

7 Armature Lampu Downlight Skylight, Artolite, Mentari.


SPESIFIKASI MERK MATERIAL PROYEK EMC CIANJUR

NO ITEM MATERIAL MERK KONTRAKTOR

8 Bohlam Lampu Philips, Osram.

9 Kabel Tray Tray Tec.

10 Pipa Conduit Clipsal.

11 Kabel Instalasi Lampu, Stop Kontak, AC. Supreme, Kabelmetal, Kabelindo.

12 Outlet Sakelar dan Stop Kontak Schneider Clipsal Type C-Vivace

D FIRE ALARM

1 MCPFA Edward, Notifier, Nohmi.

2 Alarm Detector Edward, Notifier, Nohmi.

3 Manual Push Button Edward, Notifier, Nohmi.

4 Alarm Bell Edward, Notifier, Nohmi.

5 Alarm Indicator Lamp Edward, Notifier, Nohmi.

6 Pipa Conduit Clipsal.

7 Kabel Instalasi Fire Alarm Supreme, Kabelmetal, Kabelindo.

8 Fire Extinghuser Appron, Servvo.

E CCTV

1 Digital Multiplexer Recorder 16 Chanel Samsung

2 Dome Camera Samsung

3 Outdoor Camera Samsung

4 Monitor LED Samsung

5 Kabel Coaxial Belden

6 Kabel Power NYM 2x1,5 mm2 Supreme, Kabelmetal, Kabelindo.

7 Pipa Conduit Clipsal

F DATA LAN
SPESIFIKASI MERK MATERIAL PROYEK EMC CIANJUR

NO ITEM MATERIAL MERK KONTRAKTOR

1 Outlet Data Schneider Clipsal Type C-Vivace

2 Kabel Instalasi UTP Cat 6 Belden

3 Pipa Conduit Clipsal

Anda mungkin juga menyukai