No
Uraian
Satuan
Kode
L.01
L.02
L.03
L.04
L.05
L.06
L.07
L.08
L.09
L.10
L.11
L.12
L.13
L.14
L.15
L.16
L.17
L.18
L.19
L.20
L.21
L.22
L.23
L.24
L.25
L.26
50,000.00
60,000.00
70,000.00
60,000.00
70,000.00
60,000.00
70,000.00
60,000.00
70,000.00
60,000.00
60,000.00
60,000.00
60,000.00
60,000.00
75,000.00
100,000.00
50,000.00
400,000.00
125,000.00
85,000.00
70,000.00
50,000.00
65,000.00
100,000.00
400,000.00
50,000.00
m3
m3
m3
m3
m3
m3
m3
m3
m3
M.01
M.02
M.03
M.04
M.05
M.06
M.07
M.08
M.09
3,075.00
75,350.00
45,000.00
2,000.00
100,000.00
124,300.00
124,300.00
90,000.00
140,000.00
1 Pekerja
2 Tukang Gali
3 Kepala Tukang batu/tembok
4 Tukang batu/tembok
5 Kepala Tukang kayu
6 Tukang kayu
7 Kepala Tukang besi/besi beton
8 Tukang besi/besi beton
9 Kepala Tukang cat/pelitur
10 Tukang cat/pelitur
11 Tukang pipa/operator pompa
12 Tukang penganyam bronjong
13 Tukang tebas
14 Tukang las
15 Mandor
16 Juru Ukur
17 Pembantu Juru Ukur
18 Akhli alat berat
19 Operator Alat Berat
20 Pembantu operator / mekanik
21 Supir truck
22 Kenek truck
23 Penjaga malam
24 Drafter CAD/manual
25 Desain Engineer
26 Operator printer/ploter
II
BAHAN / MATERIAL
1
2
3
4
5
6
7
8
9
Air
Tanah liat
Tanah urug
Lempengan rumput
Pasir urug
Sirtu
Pasir teras
Pasir pasang kali/gunung
Pasir beton
HSD.Pus Air.2
No
Uraian
Satuan
Kode
m3
m3
m3
bh
bh
M.10
M.11
M.12
M.13
M.14
10
11
12
13
14
Abu Batu
Batu kali / belah
Batu Brojol (Untuk bronjong)
Batu bata / merah bakar kw biasa
Batu bata / merah bakar pres
Harga
Satuan Dasar
( Rp. )
5
150,000.00
95,000.00
118,250.00
450.00
650.00
HSD.Pus Air.3
No
Uraian
Satuan
Kode
bh
bh
bh
m3
zak
m3
m3
m3
m3
m3
m3
m3
m3
m3
L
L
m
m
m
m
m
m
m
m
m2
m2
m
m
bh
bh
bh
bh
M.15
M.16
M.17
M.18
M.19
M.20
M.21
M.22
M.23
M.24
M.25
M.26
M.27
M.28
M.29
M.30
M.31
M.32
M.33
M.34
M.35
M.36
M.37
M.38
M.39
M.40
M.41
M.42
M.43
M.44
M.45
M.46
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
M.50
M.51
M.52
M.53
M.54
M.55
M.56
M.57
M.58
M.59
M.60
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
KELOMPOK KAYU
1
2
3
4
5
6
7
8
9
10
11
Harga
Satuan Dasar
( Rp. )
5
6,325.00
8,305.00
13,750.00
140,000.00
62,000.00
710,000.00
730,000.00
750,000.00
765,000.00
775,000.00
800,000.00
817,500.00
834,000.00
80,000.00
30,000.00
35,000.00
100,000.00
150,000.00
230,000.00
400,000.00
100,000.00
180,000.00
290,000.00
504,000.00
100,000.00
140,500.00
200,000.00
300,000.00
41,250.00
65,450.00
96,800.00
115,500.00
8,635,000.00
8,375,000.00
7,048,250.00
4,174,500.00
7,205,000.00
7,975,000.00
6,178,150.00
4,000,000.00
5,870,000.00
4,000,000.00
1,200,000.00
HSD.Pus Air.4
No
Uraian
Satuan
Kode
bt
M.61
12
Harga
Satuan Dasar
( Rp. )
5
10,000.00
HSD.Pus Air.5
Harga
Satuan Dasar
( Rp. )
5
No
Uraian
Satuan
Kode
bt
bt
bt
btg
btg
m'
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
bt
kg
m
bh
M.62
M.63
M.64
M.65
M.66
M.67
M.68
M.69
M.70
M.71
M.72
M.73
M.74
M.75
M.76
M.77
M.78
M.79
M.80
M.80
12,100.00
16,500.00
19,800.00
70,250.00
115,000.00
350,000.00
1,275,000.00
45,000.00
55,000.00
80,000.00
125,000.00
135,000.00
200,000.00
112,000.00
125,000.00
67,500.00
80,000.00
10,000.00
11,550.00
7,500,000.00
kg
kg
kg
kg
kg
kg
m'
m'
kg
kg
kg
kg
kg
lbr
lbr
lbr
lbr
m'
m'
m'
m'
m'
m'
m'
kg
M.90
M.91
M.92
M.93
M.94
M.95
M.96
M.97
M.98
M.99
M.100
M.101
M.102
M.103
M.104
M.105
M.106
M.107
M.108
M.109
M.110
M.111
M.112
M.113
M.114
10,000.00
6,356.00
5,353.00
8,628.00
36,500.00
12,100.00
16,667.75
28,335.00
15,000.00
23,100.00
12,500.00
14,500.00
25,000.00
60,200.00
50,000.00
50,000.00
36,000.00
35,000.00
29,000.00
29,000.00
26,250.00
22,000.00
30,000.00
45,000.00
24,750.00
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
KELOMPOK LOGAM
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
HSD.Pus Air.6
No
Uraian
Satuan
Kode
kg
kg
kg
kg
kg
kg
kg
bh
M.115
M.116
M.117
M.118
M.119
M.120
M.121
M.125
26
27
28
29
30
31
32
33
Harga
Satuan Dasar
( Rp. )
5
19,350.00
19,350.00
26,350.00
26,350.00
26,350.00
24,750.00
30,000.00
5,000.00
HSD.Pus Air.7
Harga
Satuan Dasar
( Rp. )
5
No
Uraian
Satuan
Kode
m
m
m
m
m2
kg
bh
bh
kg
bh
bh
M.126
M.127
M.128
M.129
M.130
M.131
M.132
M.133
M.134
M.135
M.136
500,000.00
575,000.00
6,356.00
140,000.00
105,000.00
50,000.00
125,000.00
175,000.00
200,000.00
300,000.00
2,200.00
bh
unit
unit
Hari-sewa
Hari-sewa
bh
bh
Hari-sewa
Hari-sewa
Hari-sewa
bh
bh
bh
bh
bh
bh
bh
bh
unit
bh
Hari-sewa
Hari-sewa
bh
bh
bh
jam
jam
jam
Hari-sewa
Hari-sewa
Hari-sewa
E.01
E.02
E.03
E.04
E.05
E.06
E.07
E.08
E.09
E.10
E.11
E.12
E.13
E.14
E.15
E.16
E.17
E.18
E.19
E.20
E.21
E.22
E.23
E.24
E.25
E.26
E.27
E.28
E.29
E.30
E.31
11,500.00
8,000.00
135,000.00
15,000.00
15,000.00
12,000.00
100,000.00
400,000.00
134,750.00
134,750.00
25,000.00
5,000.00
45,000.00
25,000.00
5,000.00
3,000.00
1,500.00
51,150.00
12,000.00
52,250.00
400,000.00
400,000.00
15,000.00
10,000.00
5,000.00
20,000.00
168,000.00
168,000.00
136,500.00
470,800.00
539,000.00
34
35
36
37
38
39
40
41
42
43
44
III
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Keranjang/pengki
Kereta dorong
Jack hammer
Pemadat timbunan (vibro roller kecil/stamper)
Timbris
Tang / alat pemotong kawat
Palu/godam pemecah batu
Molen (Concrete Mixer 0.3 m3)
Molen (Concrete Mixer 0.125 m3)
Vibrator
Kotak adukan
Ember
Gergaji besi
Gunting pemotong baja
Kunci pembelok tulangan
Catok
Kuas
Linggis
Kayu pemikul + tampar
Bodem
Steel whell roller
Tandem roller
Alat pelancip
Tusuk bambu
Kayu Kasut
Chainsaw
Bulldozer
Exsavator
Pick up
Dump truck 3,5 ton
Dump truck 5 ton
HSD.Pus Air.8
No
Uraian
Satuan
Kode
Hari-sewa
Hari-sewa
Hari-sewa
Hari-sewa
Hari-sewa
bh
Hari-sewa
Hari-sewa
Hari-sewa
Hari-sewa
Hari-sewa
Hari-sewa
Hari-sewa
Hari-sewa
Hari-sewa
Hari-sewa
bh
bh
Hari-sewa
Hari-sewa
Hari-sewa
Hari-sewa
Hari-sewa
Hari-sewa
Hari-sewa
Hari-sewa
E.32
E.33
E.34
E.35
E.36
E.37
E.38
E.39
E.40
E.41
E.42
E.43
E.44
E.45
E.46
E.47
E.48
E.49
E.50
E.51
E.52
E.53
E.54
E.55
E.56
E.57
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
Harga
Satuan Dasar
( Rp. )
5
203,500.00
134,750.00
200,000.00
135,000.00
200,000.00
225,000.00
20,000.00
325,000.00
442,000.00
300,000.00
730,000.00
935,000.00
235,000.00
735,000.00
850,000.00
750,000.00
200,000.00
25,000.00
225,000.00
442,000.00
830,000.00
250,000.00
168,000.00
203,500.00
382,800.00
2,382,800.00
HSD.Pus Air.9
No
Uraian
Satuan
Kode
set
sewa-bulan
sewa-bulan
m
kg
kg
bh
m'
lbr
lbr
lbr
ltr
ltr
ltr
ltr
ltr
ltr
m2
lbr
lbr
lbr
lbr
lbr
lbr
lbr
bh
bh
bh
bh
bh
bh
m
m
m
m
bh
M.150
M.151
M.152
M.153
M.154
M.155
M.156
M.157
M.158
M.159
M.160
M.161
M.162
M.163
M.164
M.165
M.166
M.167
M.168
M.169
M.170
M.171
M.172
M.173
M.174
M.175
M.176
M.177
M.176
M.177
M.178
M.179
M.180
M.181
M.182
M.183
IV
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
Harga
Satuan Dasar
( Rp. )
5
LAIN-LAIN
Perlengkapan ruang jaga meja kursi
Sewa Komputer utk drafting CAD
Sewa Scaner A4
Polyfelt TS 50
Cat kayu
Aspal Panas
Karung plastik / bagor
Tali rapia / plastik
Asbes gelombang kecil uk. 80 x 180, 4mm
Asbes gelombang besar uk. 105 x 180, 5mm
Asbes uk 1 x 1 m2
Bensin/Premiun non subsidi
Solar non subsidi
Minyak tanah
Olie mesin (Mesran 40 SAE)
Minyak bekisting
Cuka Bibit
Laburan meni / ter / solinem
Reduksi kalkir dari A1 ke A2
Reduksi kalkir A2 ke kertas A4
Foto copy kertas Letter, Legal, A4
Foto copy kalkir A1 ke kalkir
Blue/black print uk A1
Blue/black print uk A2
Blue/black print uk A3
Menjilid pakai kertas di lakban A4
Menjilid pakai kertas langsung A4
Menjilid pakai kertas langsung A4 + laminasi
Menjilid uk A1
Menjilid uk A2
Menjilid uk A3
Waterstop PVC.150
Waterstop PVC.200
Waterstop PVC.270
Waterstop Rubber lebar 150mm - 200mm
Motor 2 KW 1350 rpm + pengkabelan
1,000,000.00
1,000,000.00
250,000.00
100,000.00
37,450.00
9,130.00
7,500.00
500.00
40,000.00
50,000.00
7,500.00
9,700.00
10,800.00
7,150.00
30,250.00
4,500.00
25,000.00
7,500.00
12,500.00
16,500.00
250.00
6,500.00
2,600.00
2,000.00
1,250.00
7,500.00
10,000.00
13,500.00
17,500.00
11,500.00
6,750.00
75,000.00
90,000.00
115,000.00
125,000.00
10,000,000.00
HSD.Pus Air.10
AN SEWA ALAT
Ket
6
HSD.Pus Air.11
Ket
6
HSD.Pus Air.12
Ket
6
HSD.Pus Air.13
Ket
6
HSD.Pus Air.14
Ket
6
HSD.Pus Air.15
Ket
6
HSD.Pus Air.16
Ket
6
HSD.Pus Air.17
Ket
6
HSD.Pus Air.18
Ket
6
AHSP.Pus Air.19
A.
UMUM
A.1
PEKERJAAN TANAH (T.xx)
A.1.1 Secara manual menggunakan tenaga manusia
Analisa harga satuan pekerjaan pembersihan dan pengupasan permukaan tanah
T.01 Pembersihan dan striping /kosrekan (1 m2)
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.13
L.15
OH
OH
OH
A
1
2
3
Tenaga Kerja
Pekerja
Tukang tebas
Mandor
Bahan
C
1
Peralatan
Chainsaw
D
E
F
0.009
50,000.00
0.003
60,000.00
0.001
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
T.02
T.03
E.26
jam
0.020
20,000.00
Jumlah Harga Peralatan
15 % x D
Tebas tebang berupa memotong dan membersihkan lokasi dari tanaman/ tumbuhan (1 m2)
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
Tenaga Kerja
Pekerja
Tukang tebas
Mandor
L.01
L.13
L.15
OH
OH
OH
B
1
Bahan
Minyak tanah
M.163
C
1
Peralatan
Chainsaw
E.26
jam
D
E
F
0.016
50,000.00
0.004
60,000.00
0.001
75,000.00
Jumlah Harga Tenaga Kerja
0.01
7150
Jumlah Harga Bahan
0.032
20,000.00
Jumlah Harga Peralatan
15% x D
Cabut tunggul tanaman keras minimum diameter 15 cm dengan membuang sisa tunggul kayu dan akarakar nya (1 pohon)
Harga Satuan
No
Uraian
Kode Satuan Koefisien
(Rp)
AHSP.Pus Air.20
A
1
2
3
Tenaga Kerja
Pekerja
Tukang tebas
Mandor
Bahan
L.01
L.13
L.15
OH
OH
OH
0.008
50,000.00
0.024
60,000.00
0.001
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
T.04
C
1
Peralatan
Chainsaw
D
E
F
E.26
jam
0.011
20,000.00
Jumlah Harga Peralatan
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.17
L.16
OH
OH
OH
A
1
2
3
Tenaga Kerja
Pekerja
Pembantu Juru Ukur
Juru Ukur
Bahan
0.007
50,000.00
0.002
50,000.00
0.002
100,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
C
1
2
Peralatan
Waterpass
Theodolith
D
E
F
E.34
E.53
bh
bh
0.002
200,000.00
0.002
250,000.00
Jumlah Harga Peralatan
15% x D
AHSP.Pus Air.21
T.05
T.06
Pasang profil melintang galian tanah jarak 50 m pada ruas saluran yang lurus (1 m')
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.06
L.05
L.15
OH
OH
OH
OH
0.050
50,000.00
0.050
60,000.00
0.050
70,000.00
0.005
75,000.00
Jumlah Harga Tenaga Kerja
M.58
M.53
M.100
m3
m3
kg
0.005 5,870,000.00
0.005 4,174,500.00
0.200
12,500.00
Jumlah Harga Bahan
E.34
bh
0.001
200,000.00
Jumlah Harga Peralatan
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang kayu
Kepala Tukang kayu
Mandor
B
1
2
3
Bahan
Kaso 4/6 cm
Papan 2/20
Paku
C
1
Peralatan
Waterpass
D
E
F
15% x D
Pasang profil melintang galian tanah jarak 25 m pada ruas saluran tikungan (1 m')
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.06
L.05
L.15
OH
OH
OH
OH
0.100
50,000.00
0.100
60,000.00
0.100
70,000.00
0.010
75,000.00
Jumlah Harga Tenaga Kerja
M.58
M.53
M.100
m3
m3
kg
0.010 5,870,000.00
0.010 4,174,500.00
0.400
12,500.00
Jumlah Harga Bahan
E.34
bh
0.001
200,000.00
Jumlah Harga Peralatan
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang kayu
Kepala Tukang kayu
Mandor
B
1
2
3
Bahan
Kaso 4/6 cm
Papan 2/20
Paku
C
1
Peralatan
Waterpass
D
E
F
15% x D
AHSP.Pus Air.22
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.02
L.15
OH
OH
A
1
2
Tenaga Kerja
Tukang gali
Mandor
Bahan
0.563
60,000.00
0.019
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
Peralatan
D
E
F
b)
15% x D
Galian tanah biasa pada saluran sedalam lebih besar 1m sampai dengan 2 m dan membuang hasil gal
ketempat pembuangan dengan jarak angkut lebih kecil atau sama dengan 3 m termasuk perataan d
perapihan (1 m3)
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.02
L.15
OH
OH
A
1
2
Tenaga Kerja
Tukang gali
Mandor
Bahan
Peralatan
0.675
60,000.00
0.023
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
Jumlah Harga Peralatan
D
E
F
15% x D
AHSP.Pus Air.23
Mengangkut hasil galian ketempat pembuangan dengan jarak angkut lebih besar 3 m sampai lebih kecil a
sama dengan 10 m termasuk perataan dan perapihan (1 m3)
c)
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.15
OH
OH
A
1
2
Tenaga Kerja
Pekerja
Mandor
Bahan
0.248
50,000.00
0.008
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
Peralatan
D
E
F
d)
15% x D
Mengangkut hasil galian ketempat pembuangan dengan jarak angkut lebih besar 10 m sampai lebih ke
atau sama dengan 50 m termasuk perataan dan perapihan (1 m3)
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.15
OH
OH
A
1
2
Tenaga Kerja
Pekerja
Mandor
Bahan
0.720
50,000.00
0.024
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
D
E
F
15% x D
AHSP.Pus Air.24
e)
Mengangkut hasil galian ke tempat pembuangan dengan jarak angkut setiap 100 m termasuk perataan d
perapihan (1 m3)
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.15
OH
OH
A
1
2
Tenaga Kerja
Pekerja
Mandor
Bahan
1.250
50,000.00
0.060
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
D
E
F
T.08
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.02
L.15
OH
OH
A
1
2
Tenaga Kerja
Tukang gali
Mandor
Bahan
C
1
Peralatan
Jack Hammer
D
E
F
0.752
60,000.00
0.025
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
E.03
bh
0.100
135,000.00
Jumlah Harga Peralatan
15% x D
AHSP.Pus Air.25
Galian tanah keras dengan bantuan alat pemecah pada saluran sedalam lebih besar 1 m sampai dengan
m dan membuang hasil galian ketempat pembuangan dengan jarak angkut lebih kecil atau sama dengan 3
termasuk perataan dan perapihan (1 m3)
b)
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.02
L.15
OH
OH
A
1
2
Tenaga Kerja
Tukang gali
Mandor
Bahan
C
1
Peralatan
Jack hammer
D
E
F
0.775
60,000.00
0.070
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
c)
E.03
bh
0.010
135,000.00
Jumlah Harga Peralatan
15% x D
Mengangkut hasil galian ke tempat pembuangan dengan jarak angkut lebih besar 3 m sampai lebih kecil a
sama dengan 10 m termasuk perataan dan perapihan (1 m3)
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.15
OH
OH
A
1
2
Tenaga Kerja
Pekerja
Mandor
Bahan
Peralatan
0.330
50,000.00
0.010
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
Jumlah Harga Peralatan
D
E
F
15% x D
AHSP.Pus Air.26
d)
Mengangkut hasil galian tempat pembuangan dengan jarak angkut lebih besar 10 m sampai lebih kecil a
sama dengan 50 m termasuk perataan dan perapihan (1 m3)
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.15
OH
OH
A
1
2
Tenaga Kerja
Pekerja
Mandor
Bahan
0.516
50,000.00
0.050
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
D
E
F
15% x D
Mengangkut hasil galian ke tempat pembuangan dengan jarak angkut setiap 100 m termasuk perataan d
perapihan (1 m3)
e)
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.15
OH
OH
A
1
2
Tenaga Kerja
Pekerja
Mandor
Bahan
1.250
50,000.00
0.060
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
D
E
F
15% x D
AHSP.Pus Air.27
T.09
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.15
OH
OH
A
1
2
Tenaga Kerja
Tukang gali
Mandor
Bahan
Peralatan
1.351
50,000.00
0.045
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
Jumlah Harga Peralatan
D
E
F
15% x D
Galian tanah berbatu pada saluran sedalam lebih besar 1 m sampai dengan 2 m dan membuang hasil gal
ke tempat pembuangan dengan jarak angkut lebih kecil atau sama dengan 3 m termasuk perataan d
perapihan (1 m3)
b)
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.15
OH
OH
A
1
2
Tenaga Kerja
Tukang gali
Mandor
Bahan
1.351
50,000.00
0.045
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
D
E
F
15% x D
AHSP.Pus Air.28
Mengangkut hasil galian ketempat pembuangan dengan jarak angkut lebih besar 3 m sampai lebih kecil a
sama dengan 10 m termasuk perataan dan perapihan (1 m3)
c)
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.15
OH
OH
A
1
2
Tenaga Kerja
Pekerja
Mandor
Bahan
0.330
50,000.00
0.010
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
Peralatan
D
E
F
Menggangkut hasil galian ketempat pembuangan dengan jarak angkut lebih besar 10 m sampai lebih ke
atau sama dengan 50 m termasuk perataan dan perapihan (1 m3)
d)
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.15
OH
OH
A
1
2
Tenaga Kerja
Pekerja
Mandor
Bahan
Peralatan
0.516
50,000.00
0.050
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
Jumlah Harga Peralatan
D
E
F
15% x D
AHSP.Pus Air.29
e)
Mengangkut hasil galian ke tempat pembuangan dengan jarak angkut setiap 100 m termasuk perataan dan
perapihan (1 m3)
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.15
OH
OH
A
1
2
Tenaga Kerja
Pekerja
Mandor
Bahan
Peralatan
1.250
50,000.00
0.060
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
Jumlah Harga Peralatan
D
E
F
T.10
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.02
L.15
OH
OH
A
1
2
Tenaga Kerja
Tukang gali
Mandor
Bahan
Peralatan
0.833
60,000.00
0.083
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
Jumlah Harga Peralatan
D
E
F
15% x D
AHSP.Pus Air.30
b)
Galian tanah lumpur pada saluran sedalam lebih besar 1 m sampai dengan 2 m dan membuang hasil gal
ketempat pembuangan dengan jarak angkut lebih kecil atau sama dengan 3 m termasuk perataan d
perapihan (1 m3)
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.02
L.15
OH
OH
A
1
2
Tenaga Kerja
Tukang gali
Mandor
Bahan
1.083
60,000.00
0.108
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
D
E
F
15% x D
Menggangkut hasil galian ke tempat pembuangan dengan jarak angkut lebih besar 3 m sampai lebih ke
atau sama dengan 10 m termasuk perataan dan perapihan (1 m3)
c)
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.15
OH
OH
A
1
2
Tenaga Kerja
Pekerja
Mandor
Bahan
0.330
50,000.00
0.010
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
D
E
F
15 % x D
AHSP.Pus Air.31
d)
Mengangkut hasil galian ke tempat pembuangan dengan jarak angkut lebih besar 10 m sampai lebih ke
atau sama dengan 50 m termasuk perataan dan perapihan (1 m3)
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.15
OH
OH
A
1
2
Tenaga Kerja
Pekerja
Mandor
Bahan
Peralatan
0.516
50,000.00
0.050
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
Jumlah Harga Peralatan
D
E
F
15% x D
Mengangkut hasil galian ke tempat pembuangan dengan jarak angkut setiap 100 m termasuk perataan d
perapihan (1 m3)
e)
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.15
OH
OH
A
1
2
Tenaga Kerja
Pekerja
Mandor
Bahan
1.250
50,000.00
0.060
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
D
E
F
15% x D
AHSP.Pus Air.32
T.11
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.02
L.15
OH
OH
A
1
2
Tenaga Kerja
Tukang gali
Mandor
Bahan
1.250
60,000.00
0.125
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
D
E
F
b)
15% x D
Galian tanah cadas dengan bantuan alat pemecah pada saluran sedalam lebih besar 1 m sampai dengan
m dan membuang hasil galian ketempat pembuangan dengan jarak angkut lebih kecil atau sama dengan 3
termasuk perataan dan perapihan (1 m3)
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.02
L.15
OH
OH
A
1
2
Tenaga Kerja
Tukang gali
Mandor
Bahan
1.392
60,000.00
0.055
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
Peralatan
D
E
F
c)
15% x D
Mengangkut hasil galian ke tempat pembuangan dengan jarak angkut lebih besar 3 m sampai lebih kecil a
sama dengan 10 m termasuk perataan dan perapihan (1 m3)
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
Tenaga Kerja
AHSP.Pus Air.33
1
2
Pekerja
Mandor
Bahan
Peralatan
L.01
L.15
OH
OH
0.330
50,000.00
0.010
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
Jumlah Harga Peralatan
D
E
F
d)
15% x D
Mengangkut hasil galian ke tempat pembuangan dengan jarak angkut lebih besar 10 m sampai lebih ke
atau sama dengan 50 m termasuk perataan dan perapihan (1 m3)
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.15
OH
OH
A
1
2
Tenaga Kerja
Pekerja
Mandor
Bahan
Peralatan
0.516
50,000.00
0.050
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
Jumlah Harga Peralatan
D
E
F
e)
15% x D
Mengangkut hasil galian ke tempat pembuangan dengan jarak angkut setiap 100 m termasuk perataan d
perapihan (1 m3)
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.15
OH
OH
A
1
2
Tenaga Kerja
Pekerja
Mandor
Bahan
1.250
50,000.00
0.060
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
D
E
F
15% x D
AHSP.Pus Air.34
T.12
Galian pasir untuk fondasi bangunan sedalam lebih kecil sama dengan 1 m dan membuang hasil galian ke tem
pembuangan dengan jarak angkut lebih kecil atau sama dengan 3 m termasuk perataan dan perapihan (1 m3)
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.15
OH
OH
A
1
2
Tenaga Kerja
Pekerja
Mandor
Bahan
Peralatan
0.663
50,000.00
0.063
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
Jumlah Harga Peralatan
D
E
F
T.13
15% x D
Peledakan batuan
Pelaksanaan peledakan batuan biasanya harus dilakukan oleh suatu badan yang berwenang atau perusaha
yang telah mempunyai izin resmi misalnya PT. Dahana, Tasikmalaya, Indonesia. Perhitungan biaya untuk cara
sangat ditentukan oleh tingkat kekerasan atau jenis batuannya, posisi lokasi dan dimensi batuannya. Un
keperluan harga satuan diperlukan deskripsi kondisi-kondisi tersebut yang kemudian akan dapat dihitung har
satuannya dari pelaksana peledakannya
Analisa harga satuan pekerjaan timbunan tanah
T.14
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.15
OH
OH
A
1
2
Tenaga Kerja
Pekerja
Mandor
Bahan
C
1
Peralatan
Pemadat Timbunan (Stamper)
D
E
F
0.330
50,000.00
0.012
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
E.04
unit/m3
0.050
15,000.00
Jumlah Harga Peralatan
15% x D
AHSP.Pus Air.35
b)
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.15
OH
OH
A
1
2
Tenaga Kerja
Pekerja
Mandor
Bahan
0.500
50,000.00
0.050
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
C
1
Peralatan
Pemadat Timbunan (Stamper)
D
E
F
c)
E.04 Hari-sewa
0.050
15,000.00
Jumlah Harga Peralatan
15% x D
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
Tenaga Kerja
Pekerja
Mandor
L.01
L.15
OH
OH
0.400
50,000.00
0.040
75,000.00
Jumlah Harga Tenaga Kerja
B
1
Bahan
Pasir pasang
M.08
m3
90,000.00
1.200
Jumlah Harga Bahan
Peralatan
D
E
F
d)
15% x D
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.15
OH
OH
A
1
2
Tenaga Kerja
Pekerja
Mandor
Bahan
0.100
50,000.00
0.010
75,000.00
Jumlah Harga Tenaga Kerja
AHSP.Pus Air.36
Peralatan
Pemadat Timbunan (Stamper)
D
E
F
E.04 Hari-sewa
0.100
15,000.00
Jumlah Harga Peralatan
15% x D
T.16
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.19
L.20
OH
OH
1.000
125,000.00
0.500
85,000.00
Jumlah Harga Tenaga Kerja
M.162
Liter
20
10,800.00
Jumlah Harga Bahan
E.27
Unit/jam
A
1
2
Tenaga Kerja
Operator
Mekanik
B
1
Bahan
Solar non subsidi
C
1
Peralatan
Buldozer
D
E
F
1.000
168,000.00
Jumlah Harga Peralatan
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.19
L.20
L.23
OH
OH
OH
A
1
2
3
Tenaga Kerja
Operator
Mekanik
Penjaga malam
1.000
0.500
2.000
125,000.00
85,000.00
65,000.00
AHSP.Pus Air.37
T.17
T.18
B
1
Bahan
Solar non subsidi
C
1
Peralatan
Excavator
D
E
F
M.162
Liter
E.28
Unit/jam
15
10,800.00
Jumlah Harga Bahan
1.000
168,000.00
Jumlah Harga Peralatan
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.21
L.22
OH
OH
1.000
70,000.00
1.000
50,000.00
Jumlah Harga Tenaga Kerja
2.4
10,800.00
Jumlah Harga Bahan
A
1
2
Tenaga Kerja
Sopir
Kernet
B
1
Bahan
Solar non subsidi
M.162
Liter
C
1
Peralatan
Sewa Dumptruck
E.31
Unit/jam
D
E
F
1.000
539,000.00
Jumlah Harga Peralatan
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.19
L.20
OH
OH
M.162
Liter
A
1
2
Tenaga Kerja
Operator
Mekanik
B
1
Bahan
Solar non subsidi
1.000
125,000.00
0.500
85,000.00
Jumlah Harga Tenaga Kerja
20
10,800.00
AHSP.Pus Air.38
Peralatan
Buldozer
D
E
F
E.27
Unit/jam
1
168,000.00
Jumlah Harga Peralatan
15% x D
AHSP.Pus Air.39
Jumlah
(Rp)
7
450.00
180.00
75.00
705.00
400.00
400.00
1,105.00
165.75
1,270.75
mbuhan (1 m2)
Jumlah
(Rp)
7
800.00
240.00
75.00
1,115.00
71.50
71.50
640.00
640.00
1,826.50
273.98
2,100.48
AHSP.Pus Air.40
400.00
1,440.00
75.00
1,915.00
220.00
220.00
2,135.00
320.25
2,455.25
Jumlah
(Rp)
7
350.00
100.00
200.00
650.00
400.00
500.00
500.00
1,150.00
172.50
1,322.50
AHSP.Pus Air.41
us (1 m')
Jumlah
(Rp)
7
2,500.00
3,000.00
3,500.00
375.00
9,375.00
29,350.00
20,872.50
2,500.00
52,722.50
200.00
200.00
62,297.50
9,344.63
71,642.13
(1 m')
Jumlah
(Rp)
7
5,000.00
6,000.00
7,000.00
750.00
18,750.00
58,700.00
41,745.00
5,000.00
105,445.00
200.00
200.00
124,395.00
18,659.25
143,054.25
AHSP.Pus Air.42
Jumlah
(Rp)
7
33,780.00
1,425.00
35,205.00
35,205.00
5,280.75
40,485.75
Jumlah
(Rp)
7
40,500.00
1,725.00
42,225.00
42,225.00
6,333.75
48,558.75
AHSP.Pus Air.43
Jumlah
(Rp)
7
12,400.00
600.00
13,000.00
13,000.00
1,950.00
14,950.00
Jumlah
(Rp)
7
36,000.00
1,800.00
37,800.00
37,800.00
5,670.00
43,470.00
AHSP.Pus Air.44
Jumlah
(Rp)
7
62,500.00
4,500.00
67,000.00
67,000.00
10,050.00
77,050.00
Jumlah
(Rp)
7
45,120.00
1,875.00
46,995.00
13,500.00
13,500.00
60,495.00
9,074.25
69,569.25
AHSP.Pus Air.45
Jumlah
(Rp)
7
46,500.00
5,250.00
51,750.00
1,350.00
1,350.00
53,100.00
7,965.00
61,065.00
Jumlah
(Rp)
7
16,500.00
750.00
17,250.00
17,250.00
2,587.50
19,837.50
AHSP.Pus Air.46
Jumlah
(Rp)
7
25,800.00
3,750.00
29,550.00
29,550.00
4,432.50
33,982.50
Jumlah
(Rp)
7
62,500.00
4,500.00
67,000.00
67,000.00
10,050.00
77,050.00
AHSP.Pus Air.47
Jumlah
(Rp)
7
67,550.00
3,375.00
70,925.00
70,925.00
10,638.75
81,563.75
Jumlah
(Rp)
7
67,550.00
3,375.00
70,925.00
70,925.00
10,638.75
81,563.75
AHSP.Pus Air.48
Jumlah
(Rp)
7
16,500.00
750.00
17,250.00
17,250.00
2,587.50
19,837.50
Jumlah
(Rp)
7
25,800.00
3,750.00
29,550.00
29,550.00
4,432.50
33,982.50
AHSP.Pus Air.49
Jumlah
(Rp)
7
62,500.00
4,500.00
67,000.00
67,000.00
10,050.00
77,050.00
Jumlah
(Rp)
7
49,980.00
6,225.00
56,205.00
56,205.00
8,430.75
64,635.75
AHSP.Pus Air.50
Jumlah
(Rp)
7
64,980.00
8,100.00
73,080.00
73,080.00
10,962.00
84,042.00
Jumlah
(Rp)
7
16,500.00
750.00
17,250.00
17,250.00
2,587.50
19,837.50
AHSP.Pus Air.51
Jumlah
(Rp)
7
25,800.00
3,750.00
29,550.00
29,550.00
4,432.50
33,982.50
Jumlah
(Rp)
7
62,500.00
4,500.00
67,000.00
67,000.00
10,050.00
77,050.00
AHSP.Pus Air.52
Jumlah
(Rp)
7
75,000.00
9,375.00
84,375.00
84,375.00
12,656.25
97,031.25
Jumlah
(Rp)
7
83,520.00
4,125.00
87,645.00
87,645.00
13,146.75
100,791.75
Jumlah
(Rp)
7
AHSP.Pus Air.53
16,500.00
750.00
17,250.00
17,250.00
2,587.50
19,837.50
Jumlah
(Rp)
7
25,800.00
3,750.00
29,550.00
29,550.00
4,432.50
33,982.50
Jumlah
(Rp)
7
62,500.00
4,500.00
67,000.00
67,000.00
10,050.00
77,050.00
AHSP.Pus Air.54
Jumlah
(Rp)
7
33,150.00
4,725.00
37,875.00
37,875.00
5,681.25
43,556.25
Jumlah
(Rp)
7
16,500.00
900.00
17,400.00
750.00
750.00
18,150.00
2,722.50
20,872.50
AHSP.Pus Air.55
Jumlah
(Rp)
7
25,000.00
3,750.00
28,750.00
750.00
750.00
29,500.00
4,425.00
33,925.00
Jumlah
(Rp)
7
20,000.00
3,000.00
23,000.00
108,000.00
108,000.00
131,000.00
19,650.00
150,650.00
Jumlah
(Rp)
7
5,000.00
750.00
5,750.00
AHSP.Pus Air.56
1,500.00
1,500.00
7,250.00
1,087.50
8,337.50
Jumlah
(Rp)
7
125,000.00
42,500.00
167,500.00
216,000.00
216,000.00
168,000.00
168,000.00
551,500.00
82,725.00
634,225.00
4,113.00
Jumlah
(Rp)
7
125,000.00
42,500.00
130,000.00
AHSP.Pus Air.57
172,500.00
162,000.00
162,000.00
168,000.00
168,000.00
502,500.00
75,375.00
577,875.00
16,463.68
Jumlah
(Rp)
7
70,000.00
50,000.00
120,000.00
25,920.00
25,920.00
539,000.00
539,000.00
684,920.00
102,738.00
787,658.00
12,853.43
Jumlah
(Rp)
7
125,000.00
42,500.00
167,500.00
216,000.00
AHSP.Pus Air.58
216,000.00
168,000.00
168,000.00
551,500.00
82,725.00
634,225.00
11,684.32
A.2
P.01
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala Tukang
Mandor
L.01
L.04
L.03
L.15
OH
OH
OH
OH
2.703
50,000.00
0.900
60,000.00
0.090
70,000.00
0.135
75,000.00
Jumlah Harga Tenaga Kerja
B
1
2
3
Bahan
Batu
Pasir Pasang
Portland Cement
M.11
M.08
M.19
m3
m3
kg
1.200
95,000.00
0.440
90,000.00
252
1,240.00
Jumlah Harga Bahan
C
1
Peralatan
Molen
E.08
unit/hari
D
E
F
0.167
400,000.00
Jumlah Harga Peralatan
15% x D
Mortar tipe S (untuk mutu PP tertentu setara dengan campuran 1 PC:3 PP)
b)
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala Tukang
Mandor
L.01
L.04
L.03
L.15
OH
OH
OH
OH
2.703
50,000.00
0.900
60,000.00
0.090
70,000.00
0.135
75,000.00
Jumlah Harga Tenaga Kerja
B
1
2
3
Bahan
Batu
Pasir Pasang
Portland Cement
M.11
M.08
M.19
m3
m3
kg
1.200
95,000.00
0.485
90,000.00
202
1,240.00
Jumlah Harga Bahan
C
1
Peralatan
Molen
E.08
unit/hari
D
E
F
c)
No
0.167
400,000.00
Jumlah Harga Peralatan
15% x D
Mortar tipe N (untuk mutu PP tertentu setara dengan campuran 1 PC:4 PP)
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala Tukang
Mandor
L.01
L.04
L.03
L.15
OH
OH
OH
OH
2.703
50,000.00
0.900
60,000.00
0.090
70,000.00
0.135
75,000.00
Jumlah Harga Tenaga Kerja
B
1
2
3
Bahan
Batu kali
Pasir Pasang
Portland Cement
M.11
M.08
M.19
m3
m3
kg
1.200
95,000.00
0.520
90,000.00
163.000
1,240.00
Jumlah Harga Bahan
C
1
Peralatan
Molen
E.08
unit/hari
0.167
400,000.00
Jumlah Harga Peralatan
D
E
F
15% x D
Mortar tipe O (untuk mutu PP tertentu setara dengan campuran 1 PC:5 PP)
d)
P.02
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala Tukang
Mandor
L.01
L.04
L.03
L.15
OH
OH
OH
OH
2.703
50,000.00
0.900
60,000.00
0.090
70,000.00
0.135
75,000.00
Jumlah Harga Tenaga Kerja
B
1
2
3
Bahan
Batu kali
Pasir Pasang
Portland Cement
M.11
M.08
M.19
m3
m3
kg
1.200
95,000.00
0.544
90,000.00
135.000
1,240.00
Jumlah Harga Bahan
C
1
Peralatan
Molen
E.08
unit/hari
0.167
400,000.00
Jumlah Harga Peralatan
D
E
F
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.04
OH
OH
A
1
2
Tenaga Kerja
Pekerja
Tukang batu
0.300
0.150
50,000.00
60,000.00
3
4
Kepala Tukang
Mandor
L.03
L.15
OH
OH
0.015
70,000.00
0.015
75,000.00
Jumlah Harga Tenaga Kerja
B
1
2
Bahan
Pasir Pasang
Portland Cement
M.08
M.19
m3
kg
0.012
90,000.00
6.340
1,240.00
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
D
E
F
b)
15% x D
Siaran dengan mortar jenis PC-PP tipe S (untuk mutu PP tertentu setara dengan campuran 1 PC:3 PP)
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala Tukang
Mandor
L.01
L.04
L.03
L.15
OH
OH
OH
OH
0.300
50,000.00
0.150
60,000.00
0.015
70,000.00
0.015
75,000.00
Jumlah Harga Tenaga Kerja
B
1
2
Bahan
Pasir Pasang
Portland Cement
M.08
M.19
m3
kg
0.018
90,000.00
4.840
1,240.00
Jumlah Harga Bahan
Peralatan
D
E
F
P.03
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala Tukang
Mandor
L.01
L.04
L.03
L.15
OH
OH
OH
OH
0.300
50,000.00
0.150
60,000.00
0.015
70,000.00
0.015
75,000.00
Jumlah Harga Tenaga Kerja
B
1
2
Bahan
Pasir Pasang
Portland Cement
M.08
M.19
m3
kg
0.014
90,000.00
7.240
1,240.00
Jumlah Harga Bahan
Peralatan
15% x D
Plesteral tebal 1 cm, dengan mortar jenis PC-PP tipe S (untuk mutu PP tertentu setara dengan campuran 1
PC:3 PP)
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala Tukang
Mandor
L.01
L.04
L.03
L.15
OH
OH
OH
OH
0.300
50,000.00
0.150
60,000.00
0.015
70,000.00
0.015
75,000.00
Jumlah Harga Tenaga Kerja
B
1
2
Bahan
Pasir Pasang
Portland Cement
M.08
M.19
m3
kg
0.016
90,000.00
5.840
1,240.00
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
D
E
F
c)
15% x D
Plesteran tebal 1 cm, dengan mortar jenis PC-PP tipe N (untuk mutu PP tertentu setara dengan campuran 1
PC:4 PP)
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala Tukang
Mandor
L.01
L.04
L.03
L.15
OH
OH
OH
OH
0.300
50,000.00
0.150
60,000.00
0.015
70,000.00
0.015
75,000.00
Jumlah Harga Tenaga Kerja
B
1
2
Bahan
Pasir Pasang
Portland Cement
M.08
M.19
m3
kg
0.018
90,000.00
4.450
1,240.00
Jumlah Harga Bahan
Peralatan
D
E
F
d)
No
15% x D
Trasraam tebal 1,5 cm, dengan mortar jenis PC-PP tipe M (untuk mutu PP tertentu setara dengan campuran
1 PC:2 PP)
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala Tukang
Mandor
L.01
L.04
L.03
L.15
OH
OH
OH
OH
0.384
50,000.00
0.190
60,000.00
0.019
70,000.00
0.019
75,000.00
Jumlah Harga Tenaga Kerja
B
1
2
Bahan
Pasir Pasang
Portland Cement
M.08
M.19
m3
kg
0.020
90,000.00
10.224
1,240.00
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
D
E
F
e)
15% x D
Plesteran tebal 1,5 cm, dengan mortar jenis PC-PP tipe S (untuk mutu PP tertentu setara dengan campuran
1 PC:3 PP)
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala Tukang
Mandor
L.01
L.04
L.03
L.15
OH
OH
OH
OH
0.384
50,000.00
0.190
60,000.00
0.019
70,000.00
0.019
75,000.00
Jumlah Harga Tenaga Kerja
B
1
2
Bahan
Pasir Pasang
Portland Cement
M.08
M.19
m3
kg
0.030
90,000.00
7.776
1,240.00
Jumlah Harga Bahan
Peralatan
D
E
F
f)
15% x D
Plesteran tebal 1,5 cm, dengan mortar jenis PC-PP tipe N (untuk mutu PP tertentu setara dengan campuran
1 PC:4 PP)
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.04
L.03
OH
OH
OH
A
1
2
3
Tenaga Kerja
Pekerja
Tukang batu
Kepala Tukang
0.384
0.190
0.019
50,000.00
60,000.00
70,000.00
Mandor
L.15
OH
0.019
75,000.00
Jumlah Harga Tenaga Kerja
B
1
2
Bahan
Pasir Pasang
Portland Cement
M.08
M.19
m3
kg
0.024
90,000.00
6.280
1,240.00
Jumlah Harga Bahan
Peralatan
D
E
F
P.04
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala Tukang
Mandor
L.01
L.04
L.03
L.15
OH
OH
OH
OH
1.000
50,000.00
0.400
60,000.00
0.040
70,000.00
0.040
75,000.00
Jumlah Harga Tenaga Kerja
B
1
2
Bahan
Batu/batu belah
Pasir Pasang
M.11
M.08
m3
m3
1.200
95,000.00
0.432
90,000.00
Jumlah Harga Bahan
Peralatan
D
E
F
P.05
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.12
L.07
L.01
L.15
OH
OH
OH
OH
OH
0.585
50,000.00
0.500
60,000.00
0.050
70,000.00
0.100
50,000.00
0.015
75,000.00
Jumlah Harga Tenaga Kerja
M.12
M.115
m3
kg
1.800
118,250.00
2.850
19,350.00
Jumlah Harga Bahan
A
1
2
3
4
5
Tenaga Kerja
Pekerja Penganyam
Tukang Penganyam
Kepala Tukang Penganyam
Pekerja Pengisi Batu
Mandor
Bahan
1
2
Peralatan
D
E
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.12
L.07
L.01
L.15
OH
OH
OH
OH
OH
0.675
50,000.00
0.600
60,000.00
0.060
70,000.00
0.100
50,000.00
0.015
75,000.00
Jumlah Harga Tenaga Kerja
M.12
M.116
m3
kg
1.800
118,250.00
7.680
19,350.00
Jumlah Harga Bahan
A
1
2
3
4
5
Tenaga Kerja
Pekerja Penganyam
Tukang Penganyam
Kepala Tukang Penganyam
Pekerja Pengisi Batu
Mandor
Bahan
1
2
Peralatan
D
E
b)
15% x D
Bronjong kawat uk. B=1,0 m x L=3,0 m x T=0,5 m berisi batu kali/belah, Kawat bronjong anyaman heksagonal,
diagonal lubang 15 cm, jenis kawat digalvanis, anyaman tiga lilitan serta menggunakan rangka besi beton
diameter 10 - 12 mm.
1) Menggunakan kawat f 3mm
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.12
L.07
L.01
L.15
OH
OH
OH
OH
OH
0.750
50,000.00
0.300
60,000.00
0.060
70,000.00
0.100
50,000.00
0.015
75,000.00
Jumlah Harga Tenaga Kerja
M.12
M.115
M.91
m3
kg
kg
1.800
118,250.00
4.320
19,350.00
24.500
6,356.00
Jumlah Harga Bahan
A
1
2
3
4
5
Tenaga Kerja
Pekerja Penganyam
Tukang Penganyam
Kepala Tukang Penganyam
Pekerja Pengisi Batu
Mandor
Bahan
1
2
3
Peralatan
Jumlah Harga Peralatan
D
E
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.12
L.07
L.01
L.15
OH
OH
OH
OH
OH
0.850
50,000.00
0.300
60,000.00
0.060
70,000.00
0.100
50,000.00
0.015
75,000.00
Jumlah Harga Tenaga Kerja
M.12
M.116
M.92
m3
kg
kg
1.800
118,250.00
7.680
19,350.00
35.300
5,353.00
Jumlah Harga Bahan
A
1
2
3
4
5
Tenaga Kerja
Pekerja Penganyam
Tukang Penganyam
Kepala Tukang Penganyam
Pekerja Pengisi Batu
Mandor
Bahan
1
2
3
Peralatan
D
E
c)
15% x D
Bronjong kawat uk. B=1,0 m x L=3,0 m x T=0,5 m berisi batu kali/belah, Kawat bronjong anyaman heksagonal,
diagonal lubang 15 cm, jenis kawat digalvanis di las satu sama lain dibuat di pabrik serta menggunakan
pengikat/penyambung dengan kawat bronjong diameter 4 mm.
1) Menggunakan kawat f 6mm
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.12
L.07
L.01
L.15
OH
OH
OH
OH
OH
0.150
50,000.00
0.050
60,000.00
0.010
70,000.00
0.100
50,000.00
0.010
75,000.00
Jumlah Harga Tenaga Kerja
M.12
M.117
M.116
m3
kg
kg
1.800
118,250.00
4.320
26,350.00
4.500
19,350.00
Jumlah Harga Bahan
A
1
2
3
4
5
Tenaga Kerja
Pekerja Penganyam
Tukang Penganyam
Kepala Tukang Penganyam
Pekerja Pengisi Batu
Mandor
B
1
2
3
Bahan
Batu / batu belah
Wiremesh utk Bronjong dia 6 mm
Kawat bronjong dia 4 mm
Peralatan
Jumlah Harga Peralatan
D
E
F
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
4
5
Tenaga Kerja
Pekerja Penganyam
Tukang Penganyam
Kepala Tukang Penganyam
Pekerja Pengisi Batu
Mandor
B
1
2
3
Bahan
Batu / batu belah
Wiremesh utk Bronjong dia 8 mm
Kawat bronjong dia 4 mm
Peralatan
L.01
L.12
L.07
L.01
L.15
OH
OH
OH
OH
OH
0.200
50,000.00
0.060
60,000.00
0.012
70,000.00
0.100
50,000.00
0.010
75,000.00
Jumlah Harga Tenaga Kerja
M.12
M.118
M.116
m3
kg
kg
1.800
118,250.00
7.680
26,350.00
7.500
19,350.00
Jumlah Harga Bahan
Jumlah Harga Peralatan
D
E
F
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.12
L.07
L.01
L.15
OH
OH
OH
OH
OH
0.250
50,000.00
0.100
60,000.00
0.010
70,000.00
0.100
50,000.00
0.010
75,000.00
Jumlah Harga Tenaga Kerja
M.12
M.119
M.116
m3
kg
kg
1.800
118,250.00
11.000
26,350.00
10.000
19,350.00
Jumlah Harga Bahan
A
1
2
3
4
5
Tenaga Kerja
Pekerja Penganyam
Tukang Penganyam
Kepala Tukang Penganyam
Pekerja Pengisi
Mandor
B
1
2
3
Bahan
Batu / batu belah
Wiremesh utk Bronjong dia 10 mm
Kawat bronjong dia 4 mm
Peralatan
Jumlah Harga Peralatan
D
E
F
15% x D
d)
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.04
OH
OH
A
1
2
Tenaga Kerja
Pekerja
Tukang batu
0.030
0.010
50,000.00
60,000.00
3
4
Kepala Tukang
Mandor
B
1
2
Bahan
Kayu / bambu dia 8 - 10
Laburan meni / ter
C
1
Peralatan
Alat pancang manual
(Tripod tinggi 5m, berat tumbuk 5kg)
L.03
L.15
OH
OH
0.005
70,000.00
0.001
75,000.00
Jumlah Harga Tenaga Kerja
M.63
M.167
m
m2
1.150
5,500.00
0.020
7,500.00
Jumlah Harga Bahan
M.80 Hari-sewa
0.025
11,550.00
15% x D
e)
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.15
OH
OH
M.79
m2
A
1
2
Tenaga Kerja
Pekerja
Mandor
B
1
Bahan
Lapisan ijuk 5 cm (hanya untuk bronjong
yang menempel dengan tanah)
C
1
Peralatan
Crane daya angkat 5 ton, panjang lengan
15 m
0.120
50,000.00
0.010
75,000.00
Jumlah Harga Tenaga Kerja
1.150
10,000.00
0.01
730,000.00
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala Tukang
Mandor
L.01
L.04
L.03
L.15
OH
OH
OH
OH
B
1
2
3
Bahan
Batu muka
Pasir Pasang
Portland Cement
M.39
M.08
M.19
m2
m3
kg
0.240
50,000.00
0.120
60,000.00
0.010
70,000.00
0.012
75,000.00
Jumlah Harga Tenaga Kerja
1.250
0.025
5.000
100,000.00
90,000.00
1,240.00
Peralatan
D
E
F
P.07
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala Tukang
Mandor
L.01
L.04
L.03
L.15
OH
OH
OH
OH
0.240
50,000.00
0.120
60,000.00
0.010
70,000.00
0.012
75,000.00
Jumlah Harga Tenaga Kerja
B
1
2
3
Bahan
Batu candi
Pasir Pasang
Portland Cement
M.40
M.08
M.19
m2
m3
kg
1.200
140,500.00
0.025
90,000.00
5.000
1,240.00
Jumlah Harga Bahan
Peralatan
D
E
F
P.08
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
Tenaga Kerja
Pekerja
Mandor
L.01
L.15
OH
OH
0.050
50,000.00
0.005
75,000.00
Jumlah Harga Tenaga Kerja
B
1
Bahan
Polyfelt TS 50
M.153
m2
1.050
100,000.00
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
D
E
F
15% x D
Pasangan Bar Screen (saringan kasar) Bangunan Intake, Pengukur, dan Pengatur
P.09
P.10
P.11
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala Tukang batu
Mandor
L.01
L.04
L.03
L.15
OH
OH
OH
OH
B
1
2
Bahan
Besi beton dia 12 mm
Baja profil L.40.40.4
M.92
M.96
m
m
C
1
2
Peralatan
Alat las listrik atau las diesel
Bor listrik
E.44 Hari-sewa
E.38 Hari-sewa
D
E
F
0.750
50,000.00
0.300
60,000.00
0.060
70,000.00
0.015
75,000.00
Jumlah Harga Tenaga Kerja
30.000
5,353.00
4.000
16,667.75
Jumlah Harga Bahan
0.150
235,000.00
0.020
20,000.00
Jumlah Harga Peralatan
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.04
L.03
L.15
OH
OH
OH
OH
M.125
bh
5.000
M.96
4.000
16,667.75
Jumlah Harga Bahan
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala Tukang batu
Mandor
B
1
2
Bahan
Dynabolt / raamset dia 8 mm
panjamg 4 - 5 cm
Baja profil L.40.40.4
C
1
2
Peralatan
Alat las listrik atau las diesel
Bor listrik
D
E
F
E.44 Hari-sewa
E.38 Hari-sewa
0.250
50,000.00
0.150
60,000.00
0.060
70,000.00
0.010
75,000.00
Jumlah Harga Tenaga Kerja
5,000.00
0.050
235,000.00
0.060
20,000.00
Jumlah Harga Peralatan
15% x D
Buis beton diangkut < 30 m dan dipasang untuk konstruksi pengaman pantai (1 buah)
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.15
OH
OH
A
1
2
Tenaga Kerja
Pekerja
Mandor
Bahan
Peralatan
D
E
F
0.200
50,000.00
0.010
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
Jumlah Harga Peralatan
P.12
15% x D
Pengecoran 1 buah buis beton diameter 1 m' dengan campuran beton f'c= 7,4MPa(K-100)
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor
L.01
L.04
L.03
L.15
OH
OH
OH
OH
1.150
50,000.00
0.200
60,000.00
0.020
70,000.00
0.060
75,000.00
Jumlah Harga Tenaga Kerja
B
1
2
3
4
Bahan
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
Air
M.19
M.09
M.18
M.01
kg
kg
kg
ltr
247.000
1,240.00
869.000
100.00
999.000
103.70
215.000
3.08
Jumlah Harga Bahan
C
1
Peralatan
Molen
E.08 Hari-sewa
D
E
F
0.200
400,000.00
Jumlah Harga Peralatan
15% x D
Jumlah
(Rp)
7
135,150.00
54,000.00
6,300.00
10,125.00
205,575.00
114,000.00
39,600.00
312,480.00
466,080.00
66,800.00
66,800.00
738,455.00
110,768.25
849,223.25
Jumlah
(Rp)
7
135,150.00
54,000.00
6,300.00
10,125.00
205,575.00
114,000.00
43,650.00
250,480.00
408,130.00
66,800.00
66,800.00
680,505.00
102,075.75
782,580.75
Jumlah
(Rp)
135,150.00
54,000.00
6,300.00
10,125.00
205,575.00
114,000.00
46,800.00
202,120.00
362,920.00
66,800.00
66,800.00
635,295.00
95,294.25
730,589.25
Jumlah
(Rp)
7
135,150.00
54,000.00
6,300.00
10,125.00
205,575.00
114,000.00
48,960.00
167,400.00
330,360.00
66,800.00
66,800.00
602,735.00
90,410.25
693,145.25
15,000.00
9,000.00
1,050.00
1,125.00
26,175.00
1,080.00
7,861.60
8,941.60
35,116.60
5,267.49
40,384.09
#REF!
15,000.00
9,000.00
1,050.00
1,125.00
26,175.00
1,620.00
6,001.60
7,621.60
33,796.60
5,069.49
38,866.09
Jumlah
(Rp)
7
15,000.00
9,000.00
1,050.00
1,125.00
26,175.00
1,260.00
8,977.60
10,237.60
36,412.60
5,461.89
41,874.49
15,000.00
9,000.00
1,050.00
1,125.00
26,175.00
1,440.00
7,241.60
8,681.60
34,856.60
5,228.49
40,085.09
15,000.00
9,000.00
1,050.00
1,125.00
26,175.00
1,620.00
5,518.00
7,138.00
33,313.00
4,996.95
38,309.95
Jumlah
(Rp)
7
19,200.00
11,400.00
1,330.00
1,425.00
33,355.00
1,800.00
12,677.76
14,477.76
47,832.76
7,174.91
55,007.67
Jumlah
(Rp)
7
19,200.00
11,400.00
1,330.00
1,425.00
33,355.00
2,700.00
9,642.24
12,342.24
45,697.24
6,854.59
52,551.83
Jumlah
(Rp)
7
19,200.00
11,400.00
1,330.00
1,425.00
33,355.00
2,160.00
7,787.20
9,947.20
43,302.20
6,495.33
49,797.53
Jumlah
(Rp)
7
50,000.00
24,000.00
2,800.00
3,000.00
79,800.00
114,000.00
38,880.00
152,880.00
232,680.00
34,902.00
267,582.00
Jumlah
(Rp)
7
29,250.00
30,000.00
3,500.00
5,000.00
1,125.00
68,875.00
212,850.00
55,147.50
267,997.50
#REF!
336,872.50
50,530.88
387,403.38
Jumlah
(Rp)
7
33,750.00
36,000.00
4,200.00
5,000.00
1,125.00
80,075.00
212,850.00
148,608.00
361,458.00
441,533.00
66,229.95
507,762.95
Jumlah
(Rp)
7
37,500.00
18,000.00
4,200.00
5,000.00
1,125.00
65,825.00
212,850.00
83,592.00
155,722.00
452,164.00
517,989.00
77,698.35
595,687.35
Jumlah
(Rp)
7
42,500.00
18,000.00
4,200.00
5,000.00
1,125.00
70,825.00
212,850.00
148,608.00
188,960.90
550,418.90
621,243.90
93,186.59
714,430.49
Jumlah
(Rp)
7
7,500.00
3,000.00
700.00
5,000.00
750.00
16,950.00
212,850.00
113,832.00
87,075.00
413,757.00
430,707.00
64,606.05
495,313.05
Jumlah
(Rp)
10,000.00
3,600.00
840.00
5,000.00
750.00
20,190.00
212,850.00
202,368.00
145,125.00
560,343.00
580,533.00
87,079.95
667,612.95
Jumlah
(Rp)
7
12,500.00
6,000.00
700.00
5,000.00
750.00
24,950.00
212,850.00
289,850.00
193,500.00
696,200.00
721,150.00
108,172.50
829,322.50
eter 8 cm 10 cm
Jumlah
(Rp)
7
1,500.00
600.00
350.00
75.00
2,525.00
6,325.00
150.00
6,475.00
288.75
288.75
9,288.75
1,393.31
10,682.06
Jumlah
(Rp)
7
6,000.00
750.00
6,750.00
11,500.00
11,500.00
7,300.00
7,300.00
25,550.00
3,832.50
29,382.50
Jumlah
(Rp)
7
12,000.00
7,200.00
700.00
900.00
20,800.00
125,000.00
2,250.00
6,200.00
133,450.00
154,250.00
23,137.50
177,387.50
Jumlah
(Rp)
7
12,000.00
7,200.00
700.00
900.00
20,800.00
168,600.00
2,250.00
6,200.00
177,050.00
197,850.00
29,677.50
227,527.50
Jumlah
(Rp)
7
2,500.00
375.00
2,875.00
105,000.00
105,000.00
107,875.00
16,181.25
124,056.25
Jumlah
(Rp)
7
37,500.00
18,000.00
4,200.00
1,125.00
60,825.00
160,590.00
66,671.00
227,261.00
35,250.00
400.00
35,650.00
323,736.00
48,560.40
372,296.40
12,500.00
9,000.00
4,200.00
750.00
26,450.00
25,000.00
66,671.00
91,671.00
11,750.00
1,200.00
12,950.00
131,071.00
19,660.65
150,731.65
buah)
Jumlah
(Rp)
Jumlah
(Rp)
7
10,000.00
750.00
10,750.00
10,750.00
1,612.50
12,362.50
100)
Jumlah
(Rp)
7
57,500.00
12,000.00
1,400.00
4,500.00
75,400.00
306,280.00
86,900.00
103,600.00
661.13
497,441.13
80,000.00
80,000.00
652,841.13
97,926.17
750,767.29
AHSP.Pus Air.85
A.3
A.3.1
B.01
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
1
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang batu
Mandor
L.01
L.04
L.03
L.15
OH
OH
OH
OH
1.320
50,000.00
0.250
60,000.00
0.020
70,000.00
0.060
75,000.00
Jumlah Harga Tenaga Kerja
B
1
2
3
4
Bahan
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
Air
M.19
M.09
M.18
M.01
kg
kg
kg
L
247.000
1,240.00
869.000
100.00
999.000
103.70
215.000
3.08
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
D
E
F
B.02
15% x D
1 m3 beton mutu, fc = 7,4 MPa (K100), slump (122) cm, w/c = 0,87
a) Manual
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor
L.01
L.04
L.03
L.15
OH
OH
OH
OH
1.650
50,000.00
0.275
60,000.00
0.028
70,000.00
0.083
75,000.00
Jumlah Harga Tenaga Kerja
B
1
2
3
4
Bahan
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
Air
M.19
M.09
M.18
M.01
kg
kg
kg
L
247.000
1,240.00
869.000
100.00
999.000
103.70
215.000
3.08
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
D
E
15% x D
AHSP.Pus Air.86
b) Menggunakan Molen
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor
L.01
L.04
L.03
L.15
OH
OH
OH
OH
1.320
50,000.00
0.250
60,000.00
0.020
70,000.00
0.060
75,000.00
Jumlah Harga Tenaga Kerja
B
1
2
3
4
Bahan
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
Air
M.19
M.09
M.18
M.01
kg
kg
kg
L
247.000
1,240.00
869.000
100.00
999.000
103.70
215.000
3.08
Jumlah Harga Bahan
Peralatan
1 Molen 0,35 m3
D
E
F
B.03
E.08 Hari-sewa
0.200
400,000.00
Jumlah Harga Peralatan
15% x D
1 m3 beton mutu, fc = 9,8 MPa (K125), slump (122) cm, w/c = 0,78
a) Manual
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor
L.01
L.04
L.03
L.15
OH
OH
OH
OH
1.650
50,000.00
0.275
60,000.00
0.028
70,000.00
0.083
75,000.00
Jumlah Harga Tenaga Kerja
B
1
2
3
4
Bahan
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
Air
M.19
M.09
M.18
M.01
kg
kg
kg
L
276.000
1,240.00
828.000
100.00
1012.000
103.70
215.000
3.08
Jumlah Harga Bahan
Peralatan
AHSP.Pus Air.87
15% x D
b) Menggunakan Molen
B.04
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor
L.01
L.04
L.03
L.15
OH
OH
OH
OH
1.320
50,000.00
0.250
60,000.00
0.020
70,000.00
0.060
75,000.00
Jumlah Harga Tenaga Kerja
B
1
2
3
4
Bahan
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
Air
M.19
M.09
M.18
M.01
kg
kg
kg
L
276.000
1,240.00
828.000
100.00
1012.000
103.70
215.000
3.08
Jumlah Harga Bahan
C
1
Peralatan
Molen
E.08 Hari-sewa
D
E
F
0.200
400,000.00
Jumlah Harga Peralatan
15% x D
1 m3 beton mutu fc = 12,2 MPa (K150), slump (122) cm, w/c = 0,72
a) Manual
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor
L.01
L.04
L.03
L.15
OH
OH
OH
OH
1.650
50,000.00
0.275
60,000.00
0.028
70,000.00
0.083
75,000.00
Jumlah Harga Tenaga Kerja
B
1
2
3
Bahan
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
M.19
M.09
M.18
kg
kg
kg
299.000
799.000
1017.000
1,240.00
100.00
103.70
AHSP.Pus Air.88
Air
Peralatan
M.01
215.000
3.08
Jumlah Harga Bahan
Jumlah Harga Peralatan
D
E
F
15% x D
b) Menggunakan Molen
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor
L.01
L.04
L.03
L.15
OH
OH
OH
OH
1.320
50,000.00
0.250
60,000.00
0.020
70,000.00
0.060
75,000.00
Jumlah Harga Tenaga Kerja
B
1
2
3
4
Bahan
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
Air
M.19
M.09
M.18
M.01
kg
kg
kg
L
299.000
1,240.00
799.000
100.00
1017.000
103.70
215.000
3.08
Jumlah Harga Bahan
Peralatan
1 Molen
D
E
F
B.05
E.08 Hari-sewa
0.200
400,000.00
Jumlah Harga Peralatan
15% x D
1 m3 beton mutu, fc = 14,5 MPa (K175), slump (122) cm, w/c = 0,66
a) Manual
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor
L.01
L.04
L.03
L.15
OH
OH
OH
OH
B
1
Bahan
PC / Portland Cement
M.19
kg
1.650
50,000.00
0.275
60,000.00
0.028
70,000.00
0.083
75,000.00
Jumlah Harga Tenaga Kerja
326.000
1,240.00
AHSP.Pus Air.89
2
3
4
PB / Pasir Beton
Kr / Krikil
Air
Peralatan
M.09
M.18
M.01
kg
kg
L
760.000
100.00
1029.000
103.70
215.000
3.08
Jumlah Harga Bahan
Jumlah Harga Peralatan
D
E
F
15% x D
b) Menggunakan molen
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor
L.01
L.04
L.03
L.15
OH
OH
OH
OH
1.320
50,000.00
0.250
60,000.00
0.020
70,000.00
0.060
75,000.00
Jumlah Harga Tenaga Kerja
B
1
2
3
4
Bahan
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
Air
M.19
M.09
M.18
M.01
kg
kg
kg
L
326.000
1,240.00
760.000
100.00
1029.000
103.70
215.000
3.08
Jumlah Harga Bahan
Peralatan
1 Molen
D
E
F
E.08 Hari-sewa
0.200
400,000.00
Jumlah Harga Peralatan
15% x D
c) Menggunakan R+P
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor
L.01
L.04
L.03
L.15
OH
OH
OH
OH
B
1
Bahan
Campuran Beton Ready Mixed
M.20
m3
1.000
50,000.00
0.138
60,000.00
0.018
70,000.00
0.050
75,000.00
Jumlah Harga Tenaga Kerja
1.000
710,000.00
AHSP.Pus Air.90
Peralatan
1 Pompa dan conveyor beton
D
E
F
B.06
E.36 Hari-sewa
0.120
200,000.00
Jumlah Harga Peralatan
15% x D
1 m3 beton mutu, fc = 16,9 MPa (K200), slump (122) cm, w/c = 0,61
a) Manual
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor
L.01
L.04
L.03
L.15
OH
OH
OH
OH
1.650
50,000.00
0.275
60,000.00
0.028
70,000.00
0.083
75,000.00
Jumlah Harga Tenaga Kerja
B
1
2
3
4
Bahan
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
Air
M.19
M.09
M.18
M.01
kg
kg
kg
L
352.000
1,240.00
731.000
100.00
1031.000
103.70
215.000
3.08
Jumlah Harga Bahan
Peralatan
D
E
F
b) Menggunakan Molen
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor
L.01
L.04
L.03
L.15
OH
OH
OH
OH
B
1
Bahan
PC / Portland Cement
M.19
kg
1.320
50,000.00
0.250
60,000.00
0.020
70,000.00
0.060
75,000.00
Jumlah Harga Tenaga Kerja
352.000
1,240.00
AHSP.Pus Air.91
2
3
4
PB / Pasir Beton
Kr / Krikil
Air
M.09
M.18
M.01
kg
kg
L
731.000
100.00
1031.000
103.70
215.000
3.08
Jumlah Harga Bahan
C
1
Peralatan
Molen
E.08 Hari-sewa
D
E
F
0.200
400,000.00
Jumlah Harga Peralatan
15% x D
c) Menggunakan R+P
B.07
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor
L.01
L.04
L.03
L.15
OH
OH
OH
OH
1.000
50,000.00
0.138
60,000.00
0.018
70,000.00
0.050
75,000.00
Jumlah Harga Tenaga Kerja
B
1
Bahan
Campuran Beton Ready Mixed
M.21
m3
1.000
730,000.00
Jumlah Harga Bahan
C
1
Peralatan
Pompa dan conveyor beton
E.36 Hari-sewa
D
E
F
0.120
200,000.00
Jumlah Harga Peralatan
15% x D
1 m3 beton mutu, fc = 19,3 MPa (K225), slump (122) cm, w/c = 0,58
a) Manual
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor
L.01
L.04
L.03
L.15
OH
OH
OH
OH
B
1
Bahan
PC / Portland Cement
M.19
kg
1.650
50,000.00
0.275
60,000.00
0.028
70,000.00
0.083
75,000.00
Jumlah Harga Tenaga Kerja
371.000
1,240.00
AHSP.Pus Air.92
2
3
4
PB / Pasir Beton
Kr / Krikil
Air
Peralatan
M.09
M.18
M.01
kg
kg
L
698.000
100.00
1047.000
103.70
215.000
3.08
Jumlah Harga Bahan
Jumlah Harga Peralatan
D
E
F
15% x D
b) Menggunakan Molen
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor
L.01
L.04
L.03
L.15
OH
OH
OH
OH
1.320
50,000.00
0.250
60,000.00
0.020
70,000.00
0.060
75,000.00
Jumlah Harga Tenaga Kerja
B
1
2
3
4
Bahan
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
Air
M.19
M.09
M.18
M.01
kg
kg
kg
L
371.000
1,240.00
698.000
100.00
1047.000
103.70
215.000
3.08
Jumlah Harga Bahan
C
1
Peralatan
Molen
E.08 Hari-sewa
D
E
F
0.200
400,000.00
Jumlah Harga Peralatan
15% x D
c) Menggunakan R+P
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.04
L.03
L.15
OH
OH
OH
OH
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor
Bahan
1.000
50,000.00
0.138
60,000.00
0.018
70,000.00
0.050
75,000.00
Jumlah Harga Tenaga Kerja
AHSP.Pus Air.93
B.08
M.22
C
1
Peralatan
Pompa Beton
E.36 Hari-sewa
D
E
F
m3
1.000
750,000.00
Jumlah Harga Bahan
0.120
200,000.00
Jumlah Harga Peralatan
15% x D
1 m3 beton mutu, fc = 21,7 MPa (K250), slump (122) cm, w/c = 0,56
a) Manual
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor
L.01
L.04
L.03
L.15
OH
OH
OH
OH
1.650
50,000.00
0.275
60,000.00
0.028
70,000.00
0.083
75,000.00
Jumlah Harga Tenaga Kerja
B
1
2
3
4
Bahan
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
Air
M.19
M.09
M.18
M.01
kg
kg
kg
L
384.000
1,240.00
692.000
100.00
1039.000
103.70
215.000
3.08
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
D
E
F
15% x D
b) Menggunakan Molen
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor
L.01
L.04
L.03
L.15
OH
OH
OH
OH
B
1
2
Bahan
PC / Portland Cement
PB / Pasir Beton
M.19
M.09
kg
kg
1.320
50,000.00
0.250
60,000.00
0.020
70,000.00
0.060
75,000.00
Jumlah Harga Tenaga Kerja
384.000
692.000
1,240.00
100.00
AHSP.Pus Air.94
3
4
Kr / Krikil
Air
M.18
M.01
kg
L
1039.000
103.70
215.000
3.08
Jumlah Harga Bahan
C
1
Peralatan
Molen
E.08 Hari-sewa
D
E
F
0.200
400,000.00
Jumlah Harga Peralatan
15% x D
c) Menggunakan R+P
B.09
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor
L.01
L.04
L.03
L.15
OH
OH
OH
OH
1.000
50,000.00
0.138
60,000.00
0.018
70,000.00
0.050
75,000.00
Jumlah Harga Tenaga Kerja
B
1
Bahan
Campuran Beton Ready Mixed
M.23
m3
1.000
765,000.00
Jumlah Harga Bahan
C
1
Peralatan
Pompa Beton
E.36 Hari-sewa
D
E
F
0.120
200,000.00
Jumlah Harga Peralatan
15% x D
1 m3 beton mutu, fc = 24,0 MPa (K275), slump (122) cm, w/c = 0,53
a) Manual
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor
L.01
L.04
L.03
L.15
OH
OH
OH
OH
1.650
50,000.00
0.275
60,000.00
0.028
70,000.00
0.083
75,000.00
Jumlah Harga Tenaga Kerja
B
1
2
3
Bahan
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
M.19
M.09
M.18
kg
kg
kg
406.000
684.000
1026.000
1,240.00
100.00
103.70
AHSP.Pus Air.95
Air
Peralatan
M.01
215.000
3.08
Jumlah Harga Bahan
Jumlah Harga Peralatan
D
E
F
15% x D
b) Menggunakan Molen
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor
L.01
L.04
L.03
L.15
OH
OH
OH
OH
1.320
50,000.00
0.250
60,000.00
0.020
70,000.00
0.060
75,000.00
Jumlah Harga Tenaga Kerja
B
1
2
3
4
Bahan
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
Air
M.19
M.09
M.18
M.01
kg
kg
kg
L
406.000
1,240.00
684.000
100.00
1026.000
103.70
215.000
3.08
Jumlah Harga Bahan
C
1
Peralatan
Molen
E.08 Hari-sewa
D
E
F
0.200
400,000.00
Jumlah Harga Peralatan
15% x D
c) Menggunakan R+P
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor
L.01
L.04
L.03
L.15
OH
OH
OH
OH
1.000
50,000.00
0.138
60,000.00
0.018
70,000.00
0.050
75,000.00
Jumlah Harga Tenaga Kerja
B
1
Bahan
Campuran Beton Ready Mixed
M.24
m3
1.000
775,000.00
Jumlah Harga Bahan
Peralatan
AHSP.Pus Air.96
B.10
E.36 Hari-sewa
0.120
200,000.00
Jumlah Harga Peralatan
D
E
F
15% x D
1 m3 beton mutu, fc = 26,4 MPa (K300), slump (122) cm, w/c = 0,52
a) Manual
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.04
L.03
L.15
OH
OH
OH
OH
1.650
50,000.00
0.275
60,000.00
0.028
70,000.00
0.083
75,000.00
Jumlah Harga Tenaga Kerja
M.19
M.09
M.18
M.01
kg
kg
kg
L
L
413.000
1,240.00
681.000
100.00
1021.000
103.70
215.000
3.08
1.200
30,000.00
Jumlah Harga Bahan
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor
B
1
2
3
4
5
Bahan
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
Air
Bahan aditif
Peralatan
D
E
F
b) Menggunakan Molen
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor
L.01
L.04
L.03
L.15
OH
OH
OH
OH
B
1
2
3
4
Bahan
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
Air
M.19
M.09
M.18
M.01
kg
kg
kg
L
1.320
50,000.00
0.250
60,000.00
0.020
70,000.00
0.060
75,000.00
Jumlah Harga Tenaga Kerja
413.000
681.000
1021.000
215.000
1,240.00
100.00
103.70
3.08
AHSP.Pus Air.97
Bahan aditif
1.200
30,000.00
Jumlah Harga Bahan
C
1
Peralatan
Molen
D
E
F
E.08 Hari-sewa
0.200
400,000.00
Jumlah Harga Peralatan
15% x D
c) Menggunakan R+P
B.11
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor
L.01
L.04
L.03
L.15
OH
OH
OH
OH
1.000
50,000.00
0.138
60,000.00
0.018
70,000.00
0.050
75,000.00
Jumlah Harga Tenaga Kerja
B
1
Bahan
Campuran Beton Ready Mixed
M.25
m3
1.000
800,000.00
Jumlah Harga Bahan
C
1
Peralatan
Pompa dan conveyor beton
E.36 Hari-sewa
D
E
F
0.120
200,000.00
Jumlah Harga Peralatan
15% x D
1 m3 beton mutu, fc = 28,8 MPa, (K325), slump (122) cm, w/c = 0,49
a) Manual
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor
L.01
L.04
L.03
L.15
OH
OH
OH
OH
2.100
50,000.00
0.350
60,000.00
0.035
70,000.00
0.105
75,000.00
Jumlah Harga Tenaga Kerja
B
1
2
3
4
Bahan
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
Air
M.19
M.09
M.18
M.01
kg
kg
kg
L
439.000
670.000
1006.000
215.000
1,240.00
100.00
103.70
3.08
AHSP.Pus Air.98
Peralatan
Jumlah Harga Peralatan
D
E
F
15% x D
b) Menggunakan Molen
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor
L.01
L.04
L.03
L.15
OH
OH
OH
OH
1.680
50,000.00
0.263
60,000.00
0.025
70,000.00
0.074
75,000.00
Jumlah Harga Tenaga Kerja
B
1
2
3
4
Bahan
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
Air
M.19
M.09
M.18
M.01
kg
kg
kg
L
439.000
1,240.00
670.000
100.00
1006.000
103.70
215.000
3.08
Jumlah Harga Bahan
Peralatan
1 Molen
D
E
F
E.08 Hari-sewa
0.200
400,000.00
Jumlah Harga Peralatan
15% x D
c) Menggunakan R+P
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor
L.01
L.04
L.03
L.15
OH
OH
OH
OH
1.260
50,000.00
0.175
60,000.00
0.021
70,000.00
0.063
75,000.00
Jumlah Harga Tenaga Kerja
B
1
Bahan
Campuran Beton Ready Mixed
M.26
m3
1.000
817,500.00
Jumlah Harga Bahan
C
1
Peralatan
Pompa dan conveyor beton
E.36 Hari-sewa
0.120
200,000.00
AHSP.Pus Air.99
B.12
15% x D
1 m3 beton mutu, fc = 31,2 MPa, (K350), slump (122) cm, w/c = 0,48
a) Manual
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor
L.01
L.04
L.03
L.15
OH
OH
OH
OH
2.100
50,000.00
0.350
60,000.00
0.035
70,000.00
0.105
75,000.00
Jumlah Harga Tenaga Kerja
B
1
2
3
4
Bahan
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
Air
M.19
M.09
M.18
M.01
kg
kg
kg
L
448.000
1,240.00
667.000
100.00
1000.000
103.70
215.000
3.08
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
D
E
F
15% x D
b) Menggunakan Molen
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor
L.01
L.04
L.03
L.15
OH
OH
OH
OH
1.680
50,000.00
0.263
60,000.00
0.025
70,000.00
0.074
75,000.00
Jumlah Harga Tenaga Kerja
B
1
2
3
4
Bahan
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
Air
M.19
M.09
M.18
M.01
kg
kg
kg
L
1.000
1,240.00
667.000
100.00
1000.000
103.70
215.000
3.08
Jumlah Harga Bahan
AHSP.Pus Air.100
C
1
Peralatan
Molen
D
E
F
E.08 Hari-sewa
0.200
400,000.00
Jumlah Harga Peralatan
15% x D
c) Menggunakan R+P
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor
L.01
L.04
L.03
L.15
OH
OH
OH
OH
1.260
50,000.00
0.175
60,000.00
0.021
70,000.00
0.063
75,000.00
Jumlah Harga Tenaga Kerja
B
1
Bahan
Campuran Beton Ready Mixed
M.27
m3
1.000
834,000.00
Jumlah Harga Bahan
Peralatan
1 Pompa dan conveyor beton
D
E
F
E.36 Hari-sewa
0.120
200,000.00
Jumlah Harga Peralatan
15% x D
A.3.2
Penambahan koefisien Tenaga Kerja dan Peralatan untuk mengangkut/menaikan campuran beton setia
kenaikan vertikal 4 m dan jarak horizontal setiap 25 m ke tapak pemasangan
B.13
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.15
OH
OH
A
1
2
Tenaga Kerja
Pekerja
Mandor
Bahan
0.410
50,000.00
0.020
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
Peralatan
D
E
AHSP.Pus Air.101
F
b)
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
OH
A
1
Tenaga Kerja
Pekerja
Bahan
0.250
50,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
C
1
Peralatan
Vibrator
D
E
F
c)
E.10 Hari-sewa
0.100
134,750.00
Jumlah Harga Peralatan
15% x D
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.15
OH
OH
A
1
2
Tenaga Kerja
Pekerja
Mandor
Bahan
0.500
50,000.00
0.025
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
B.14
C
1
Peralatan
Vibrator
D
E
F
E.10 Hari-sewa
0.100
134,750.00
Jumlah Harga Peralatan
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.15
OH
OH
A
1
2
Tenaga Kerja
Pekerja
Mandor
0.500
0.025
50,000.00
75,000.00
AHSP.Pus Air.102
Bahan
Jumlah Harga Bahan
Peralatan
D
E
F
b)
15% x D
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.15
OH
OH
A
1
2
Tenaga Kerja
Pekerja
Mandor
Bahan
0.200
50,000.00
0.010
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
B.15
C
1
Peralatan
Pompa dan Conveyor beton
D
E
F
E.36 Hari-sewa
0.120
200,000.00
Jumlah Harga Peralatan
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.15
OH
OH
A
1
2
Tenaga Kerja
Pekerja
Mandor
Bahan
0.250
50,000.00
0.010
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
Peralatan
D
E
F
b)
No
15% x D
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
AHSP.Pus Air.103
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.15
OH
OH
A
1
2
Tenaga Kerja
Pekerja
Mandor
Bahan
0.200
50,000.00
0.010
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
A.3.3
B.17
C
1
Peralatan
Pompa dan conveyor beton
D
E
F
E.36 Hari-sewa
0.120
200,000.00
Jumlah Harga Peralatan
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang besi
Kepala tukang
Mandor
L.01
L.08
L.07
L.15
OH
OH
OH
OH
0.700
50,000.00
0.700
60,000.00
0.070
70,000.00
0.040
75,000.00
Jumlah Harga Tenaga Kerja
B
1
2
Bahan
Besi Beton (polos/ulir)
Kawat Ikat
M.90
M.98
kg
kg
105.000
10,000.00
1.500
15,000.00
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
D
E
F
B.18
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.08
OH
OH
A
1
2
Tenaga Kerja
Pekerja
Tukang besi
0.250
0.250
50,000.00
60,000.00
AHSP.Pus Air.104
3
4
Kepala tukang
Mandor
B
1
2
Bahan
Wiremesh
Kawat Ikat
Peralatan
L.07
L.15
OH
OH
0.020
70,000.00
0.010
75,000.00
Jumlah Harga Tenaga Kerja
M.120
M.98
kg
kg
102.000
24,750.00
0.500
15,000.00
Jumlah Harga Bahan
Jumlah Harga Peralatan
D
E
F
B.19
15% x D
Penambahan koefisien Tenaga Kerja dan Peralatan untuk mengangkut/menaikkan 100 kg tulangan setia
kenaikan vertikal 4m atau jarak horizontal setiap 25 m ke tapak pemasangan
a) Manual (kenaikan 4m)
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.08
L.15
OH
OH
OH
A
1
2
3
Tenaga Kerja
Pekerja
Tukang besi
Mandor
Bahan
Peralatan
0.300
50,000.00
0.100
60,000.00
0.020
75,000.00
Jumlah Harga Tenaga Kerja
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.08
L.15
OH
OH
OH
A
1
2
3
Tenaga Kerja
Pekerja
Tukang besi
Mandor
Bahan
0.200
50,000.00
0.040
60,000.00
0.020
75,000.00
Jumlah Harga Tenaga Kerja
AHSP.Pus Air.105
Peralatan
Crane*
D
E
F
E.43 Hari-sewa
0.025
935000.00
Jumlah Harga Peralatan
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.08
L.15
OH
OH
OH
A
1
2
3
Tenaga Kerja
Pekerja
Tukang besi
Mandor
Bahan
0.300
50,000.00
0.100
60,000.00
0.020
75,000.00
Jumlah Harga Tenaga Kerja
Peralatan
Crane*
D
E
F
E.43 Hari-sewa
0.025
935,000.00
Jumlah Harga Peralatan
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.08
L.15
OH
OH
OH
A
1
2
3
Tenaga Kerja
Pekerja
Tukang besi
Mandor
Bahan
C
1
Peralatan
Lift*
0.300
50,000.00
0.100
60,000.00
0.020
75,000.00
Jumlah Harga Tenaga Kerja
0.025
2,382,800.0
Jumlah Harga Peralatan
AHSP.Pus Air.106
E
F
B.20
A.3.4
B.21
Overhead + Profit
Harga Satuan Pekerjaan per - 100kg (D+E)
Catatan : * termasuk operator dan Bahan bakar
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang besi
Kepala Tukang besi
Mandor
L.01
L.08
L.07
L.15
OH
OH
OH
OH
0.500
50,000.00
0.500
60,000.00
0.050
70,000.00
0.030
75,000.00
Jumlah Harga Tenaga Kerja
B
1
2
3
Bahan
Kabel prestres
Besi beton
Kawat beton
M.94
M.90
M.98
kg
kg
kg
105.0
36,500.00
12.5
10,000.00
1.0
15,000.00
Jumlah Harga Bahan
C
1
Peralatan
Jack Tension/stressing
E.35 Hari-sewa
D
E
F
0.150
135,000.00
Jumlah Harga Peralatan
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.06
L.05
L.15
OH
OH
OH
OH
0.200
50,000.00
0.500
60,000.00
0.050
70,000.00
0.010
75,000.00
Jumlah Harga Tenaga Kerja
M.73
M.58
M.100
M.165
lbr
m3
kg
L
0.350
135,000.00
0.020
5,870,000.00
0.250
12,500.00
0.200
4,500.00
Jumlah Harga Bahan
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang kayu
Kepala tukang
Mandor
B
1
2
3
4
Bahan
Multiflex 18 mm
Kaso 5/7 cm
Paku 5 cm dan 7 cm
Minyak bekisting
Peralatan
Jumlah Harga Peralatan
AHSP.Pus Air.107
D
E
F
B.22
B.23
1 m2 Bekisting untuk permukaan beton biasa dengan papan ukuran 3/20 cm (tanpa perancah)
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.06
L.05
L.15
OH
OH
OH
OH
0.660
50,000.00
0.330
60,000.00
0.033
70,000.00
0.033
75,000.00
Jumlah Harga Tenaga Kerja
M.52
M.58
M.100
M.165
m3
m3
kg
L
0.040
7,048,250.00
0.020
5,870,000.00
0.400
12,500.00
0.200
4,500.00
Jumlah Harga Bahan
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang kayu
Kepala tukang
Mandor
B
1
2
3
4
Bahan
Papan 3/20 cm kayu kelas II
Kaso 5/7 cm
Paku 5 cm dan 7 cm
Minyak bekisting
Peralatan
D
E
F
1 m2 bekisting untuk permukaan beton expose dengan multiflex 12 mm atau 18 mm - kaso 5/7 cm (tanp
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.06
L.05
L.15
OH
OH
OH
OH
0.250
50,000.00
0.600
60,000.00
0.060
70,000.00
0.010
75,000.00
Jumlah Harga Tenaga Kerja
M.73
M.58
M.100
M.165
lbr
m3
kg
L
0.350
135,000.00
0.020
5,870,000.00
0.350
12,500.00
1.600
4,500.00
Jumlah Harga Bahan
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang kayu
Kepala tukang
Mandor
B
1
2
3
4
Bahan
Multiflex 18 mm
Kaso 5/7 cm
Paku 5 cm dan 7 cm
Minyak bekisting
Peralatan
AHSP.Pus Air.108
B.24
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.06
L.05
L.15
OH
OH
OH
OH
0.250
50,000.00
0.600
60,000.00
0.060
70,000.00
0.012
75,000.00
Jumlah Harga Tenaga Kerja
M.58
M.100
m3
kg
0.100
5,870,000.00
0.350
12,500.00
Jumlah Harga Bahan
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang kayu
Kepala tukang
Mandor
B
1
2
Bahan
Kaso 5/7 cm
Paku 5 cm dan 7 cm
Peralatan
Jumlah Harga Peralatan
D
E
F
B.25
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.06
L.05
L.15
OH
OH
OH
OH
0.250
50,000.00
0.600
60,000.00
0.060
70,000.00
0.012
75,000.00
Jumlah Harga Tenaga Kerja
M.66
M.100
btg
kg
6.000
115,000.00
0.350
12,500.00
Jumlah Harga Bahan
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang kayu
Kepala tukang
Mandor
Bahan
1
2
Peralatan
Jumlah Harga Peralatan
AHSP.Pus Air.109
D
E
F
B.26
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.06
L.05
L.15
OH
OH
OH
OH
0.200
50,000.00
0.500
60,000.00
0.050
70,000.00
0.010
75,000.00
Jumlah Harga Tenaga Kerja
M.73
M.58
B.25
M.100
M.165
lbr
m3
m2
kg
L
0.350
135,000.00
0.140
5,870,000.00
1.000
860,171.25
0.350
12,500.00
1.600
4,500.00
Jumlah Harga Bahan
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang kayu
Kepala tukang
Mandor
B
1
2
3
4
5
Bahan
Multiflex 18 mm
Kaso 5/7 cm
Perancah tinggi 4m'
Paku 5 cm dan 7 cm
Minyak bekisting
Peralatan
D
E
F
B.27
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.06
L.05
L.15
OH
OH
OH
OH
0.250
50,000.00
0.600
60,000.00
0.060
70,000.00
0.012
75,000.00
Jumlah Harga Tenaga Kerja
M.58
M.100
m3
kg
0.140
5,870,000.00
0.350
12,500.00
Jumlah Harga Bahan
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang kayu
Kepala tukang
Mandor
B
1
2
Bahan
Kaso 5/7 cm
Paku 5 cm dan 7 cm
Peralatan
Jumlah Harga Peralatan
D
E
15% x D
AHSP.Pus Air.110
F
B.28
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.06
L.05
L.15
OH
OH
OH
OH
0.250
50,000.00
0.600
60,000.00
0.060
70,000.00
0.012
75,000.00
Jumlah Harga Tenaga Kerja
M.66
M.100
btg
kg
6.000
115,000.00
0.350
12,500.00
Jumlah Harga Bahan
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang kayu
Kepala tukang
Mandor
Bahan
*Kayu dolken diameter 8 cm -10 cm,
panjang 4 m
Paku 5 cm dan 7 cm
Peralatan
D
E
F
B.29
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.06
L.05
L.15
OH
OH
OH
OH
0.200
50,000.00
0.500
60,000.00
0.050
70,000.00
0.010
75,000.00
Jumlah Harga Tenaga Kerja
M.73
M.58
M.100
M.165
lbr
m3
kg
L
0.350
135,000.00
0.140
5,870,000.00
0.250
12,500.00
0.200
4,500.00
Jumlah Harga Bahan
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang kayu
Kepala tukang
Mandor
B
1
2
3
4
Bahan
Multiflex 18 mm
Kaso 5/7 cm
Paku 5 cm dan 7 cm
Minyak bekisting
Peralatan
Jumlah Harga Peralatan
D
E
F
15% x D
AHSP.Pus Air.111
B.30
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.06
L.05
L.15
OH
OH
OH
OH
0.660
50,000.00
0.330
60,000.00
0.033
70,000.00
0.033
75,000.00
Jumlah Harga Tenaga Kerja
M.53
M.58
M.100
M.165
m3
m3
kg
L
0.040
4,174,500.00
0.180
5,870,000.00
0.400
12,500.00
0.200
4,500.00
Jumlah Harga Bahan
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang kayu
Kepala tukang
Mandor
B
1
2
3
4
Bahan
Papan 3/20 cm kayu kelas II
Kaso 5/7 cm
Paku 5 cm dan 7 cm
Minyak bekisting
Peralatan
Jumlah Harga Peralatan
D
E
F
B.31
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.06
L.05
L.15
OH
OH
OH
OH
0.200
50,000.00
0.500
60,000.00
0.050
70,000.00
0.010
75,000.00
Jumlah Harga Tenaga Kerja
M.73
M.58
M.100
M.165
lbr
m3
kg
L
0.350
135,000.00
0.140
5,870,000.00
0.250
12,500.00
0.200
4,500.00
Jumlah Harga Bahan
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang kayu
Kepala tukang
Mandor
B
1
2
3
4
Bahan
Multiflex 18 mm
Kaso 5/7 cm
Paku 5 cm dan 7 cm
Minyak bekisting
Peralatan
Jumlah Harga Peralatan
D
E
F
B.32
15% x D
AHSP.Pus Air.112
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.06
L.05
L.15
OH
OH
OH
OH
0.660
50,000.00
0.330
60,000.00
0.033
70,000.00
0.033
75,000.00
Jumlah Harga Tenaga Kerja
M.106
M.58
M.100
M.165
m3
m3
kg
L
0.040
36,000.00
0.180
5,870,000.00
0.400
12,500.00
0.200
4,500.00
Jumlah Harga Bahan
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang kayu
Kepala tukang
Mandor
B
1
2
3
4
Bahan
Papan 3/20 cm kayu kelas II
Kaso 5/7 cm
Paku 5 cm dan 7 cm
Minyak bekisting
Peralatan
D
E
F
B.33
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.06
L.05
L.15
OH
OH
OH
OH
0.200
50,000.00
0.500
60,000.00
0.050
70,000.00
0.010
75,000.00
Jumlah Harga Tenaga Kerja
M.73
M.58
M.100
M.165
lbr
m3
kg
L
0.350
135,000.00
0.140
5,870,000.00
0.250
12,500.00
0.200
4,500.00
Jumlah Harga Bahan
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang kayu
Kepala tukang
Mandor
B
1
2
3
4
Bahan
Multiflex 18 mm
Kaso 5/7 cm
Paku 5 cm dan 7 cm
Minyak bekisting
Peralatan
D
E
F
B.34
15% x D
Bekisting fondasi dan sloof beton biasa dengan papan ukuran 3/20 cm
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
AHSP.Pus Air.113
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.06
L.05
L.15
OH
OH
OH
OH
0.660
50,000.00
0.330
60,000.00
0.033
70,000.00
0.033
75,000.00
Jumlah Harga Tenaga Kerja
E.14
M.58
M.100
M.165
m3
m3
kg
L
0.040
25,000.00
0.180
5,870,000.00
0.400
12,500.00
0.200
4,500.00
Jumlah Harga Bahan
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang kayu
Kepala tukang
Mandor
B
1
2
3
4
Bahan
Papan 3/20 cm kayu kelas II
Kaso 5/7 cm
Paku 5 cm dan 7 cm
Minyak bekisting
Peralatan
Jumlah Harga Peralatan
D
E
F
B.35
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.15
OH
OH
A
1
2
Tenaga Kerja
Pekerja
Mandor
Bahan
Peralatan
0.600
50,000.00
0.030
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
Jumlah Harga Peralatan
D
E
F
B.36
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.15
OH
OH
A
1
2
Tenaga Kerja
Pekerja
Mandor
0.600
0.030
50,000.00
75,000.00
AHSP.Pus Air.114
Bahan
Jumlah Harga Bahan
Peralatan
D
E
F
B.37
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.15
OH
OH
A
1
2
Tenaga Kerja
Pekerja
Mandor
Bahan
0.800
50,000.00
0.040
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
D
E
F
B.38
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.15
OH
OH
A
1
2
Tenaga Kerja
Pekerja
Mandor
B
1
Bahan
Terpal/karung goni
0.800
50,000.00
0.040
75,000.00
Jumlah Harga Tenaga Kerja
Peralatan
D
E
F
b)
No
Uraian
Kode
Satuan
15% x D
Koefisien
Harga Satuan
(Rp)
AHSP.Pus Air.115
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.15
OH
OH
A
1
2
Tenaga Kerja
Pekerja
Mandor
Bahan
0.800
50,000.00
0.040
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
D
E
F
A.3.6
B.39
B.40
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.15
OH
OH
M.166
1.200
25,000.00
Jumlah Harga Bahan
E.07
E.13
E.37
bh
bh
bh
0.100
100,000.00
0.200
45,000.00
0.500
225,000.00
Jumlah Harga Peralatan
A
1
2
Tenaga Kerja
Pekerja
Mandor
Bahan
Cuka Bibit
2.000
50,000.00
0.050
75,000.00
Jumlah Harga Tenaga Kerja
C
1
2
3
Peralatan
Palu / Godam
Gergaji Besi
Pahat Beton (Baja keras)
D
E
F
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.15
OH
OH
A
1
2
Tenaga Kerja
Pekerja
Mandor
0.600
50,000.00
0.030
75,000.00
Jumlah Harga Tenaga Kerja
AHSP.Pus Air.116
Bahan
C
1
2
3
4
Peralatan
Jack Hammer
Palu / Godam
Gergaji Besi
Pahat Beton (Baja keras)
D
E
F
B.41
E.03 Hari-sewa
E.07
bh
E.13
bh
E.37
bh
0.16
135,000.00
0.050
100,000.00
0.100
45,000.00
0.200
225,000.00
Jumlah Harga Peralatan
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.06
L.05
L.15
OH
OH
OH
OH
0.050
50,000.00
0.030
60,000.00
0.003
70,000.00
0.003
75,000.00
Jumlah Harga Tenaga Kerja
M.179
M.98
m
kg
1.05
75,000.00
0.01
15,000.00
Jumlah Harga Bahan
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu/kayu/pipa
Kepala Tukang
Mandor
B
1
2
Bahan
Water Stop PVC lebar 150 mm
Kawat Beton
Peralatan
D
E
F
B.42
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.06
L.05
L.15
OH
OH
OH
OH
M.180
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu/kayu/pipa
Kepala Tukang
Mandor
B
1
Bahan
Water Stop PVC lebar 200 mm
0.055
50,000.00
0.035
60,000.00
0.0040
70,000.00
0.0040
75,000.00
Jumlah Harga Tenaga Kerja
1.05
90,000.00
AHSP.Pus Air.117
Kawat Beton
Peralatan
M.98
kg
0.01
15,000.00
Jumlah Harga Bahan
Jumlah Harga Peralatan
D
E
F
B.43
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.06
L.05
L.15
OH
OH
OH
OH
0.055
50,000.00
0.040
60,000.00
0.0040
70,000.00
0.0040
75,000.00
Jumlah Harga Tenaga Kerja
M.181
M.98
m
kg
1.05
115,000.00
0.01
15,000.00
Jumlah Harga Bahan
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu/kayu/pipa
Kepala Tukang
Mandor
B
1
2
Bahan
Water Stop PVC lebar 230-320 mm
Kawat Beton
Peralatan
D
E
F
B.44
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.06
L.05
L.15
OH
OH
OH
OH
0.060
50,000.00
0.050
60,000.00
0.0050
70,000.00
0.0050
75,000.00
Jumlah Harga Tenaga Kerja
m
kg
1.05
125,000.00
0.02
15,000.00
Jumlah Harga Bahan
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu/kayu/pipa
Kepala Tukang
Mandor
B
1
2
Bahan
Water Stop Rubber lebar 150-200 mm M.182
Kawat Beton
M.98
Peralatan
AHSP.Pus Air.118
15% x D
AHSP.Pus Air.119
AHSP.Pus Air.120
AHSP.Pus Air.121
AHSP.Pus Air.122
AHSP.Pus Air.123
AHSP.Pus Air.124
AHSP.Pus Air.125
AHSP.Pus Air.126
AHSP.Pus Air.127
AHSP.Pus Air.128
AHSP.Pus Air.129
AHSP.Pus Air.130
AHSP.Pus Air.131
AHSP.Pus Air.132
AHSP.Pus Air.133
AHSP.Pus Air.134
AHSP.Pus Air.135
AHSP.Pus Air.136
AHSP.Pus Air.137
AHSP.Pus Air.138
AHSP.Pus Air.139
AHSP.Pus Air.140
AHSP.Pus Air.141
AHSP.Pus Air.142
AHSP.Pus Air.143
AHSP.Pus Air.144
AHSP.Pus Air.145
AHSP.Pus Air.146
AHSP.Pus Air.147
AHSP.Pus Air.148
AHSP.Pus Air.149
AHSP.Pus Air.150
AHSP.Pus Air.151
AHSP.Pus Air.152
AHSP.Pus Air.153
AHSP.Pus Air.154
AHSP.Pus Air.155
AHSP.Pus Air.156
AHSP.Pus Air.157
AHSP.Pus Air.158
AHSP.Pus Air.159
AHSP.Pus Air.160
AHSP.Pus Air.161
AHSP.Pus Air.162
AHSP.Pus Air.163
AHSP.Pus Air.164
AHSP.Pus Air.165
AHSP.Pus Air.166
AHSP.Pus Air.167
AHSP.Pus Air.168
AHSP.Pus Air.169
AHSP.Pus Air.170
AHSP.Pus Air.171
AHSP.Pus Air.172
AHSP.Pus Air.173
AHSP.Pus Air.174
AHSP.Pus Air.175
AHSP.Pus Air.176
AHSP.Pus Air.177
AHSP.Pus Air.178
AHSP.Pus Air.179
AHSP.Pus Air.180
AHSP.Pus Air.181
AHSP.Pus Air.182
AHSP.Pus Air.183
AHSP.Pus Air.184
AHSP.Pus Air.185
AHSP.Pus Air.186
AHSP.Pus Air.187
AHSP.Pus Air.188
AHSP.Pus Air.189
AHSP.Pus Air.190
AHSP.Pus Air.191
AHSP.Pus Air.192
AHSP.Pus Air.193
AHSP.Pus Air.194
AHSP.Pus Air.195
AHSP.Pus Air.196
AHSP.Pus Air.197
AHSP.Pus Air.198
AHSP.Pus Air.199
AHSP.Pus Air.200
AHSP.Pus Air.201
AHSP.Pus Air.202
AHSP.Pus Air.203
AHSP.Pus Air.204
AHSP.Pus Air.205
AHSP.Pus Air.206
AHSP.Pus Air.207
AHSP.Pus Air.208
AHSP.Pus Air.209
AHSP.Pus Air.210
AHSP.Pus Air.211
#REF!
AHSP.Pus Air.212
Jumlah
(Rp)
7
66,000.00
15,000.00
1,400.00
4,500.00
86,900.00
306,280.00
86,900.00
103,600.00
661.13
497,441.13
584,341.13
87,651.17
671,992.29
Jumlah
(Rp)
7
82,500.00
16,500.00
1,960.00
6,225.00
107,185.00
306,280.00
86,900.00
103,600.00
661.13
497,441.13
604,626.13
90,693.92
AHSP.Pus Air.213
695,320.04
Jumlah
(Rp)
7
66,000.00
15,000.00
1,400.00
4,500.00
86,900.00
306,280.00
86,900.00
103,600.00
661.13
497,441.13
80,000.00
80,000.00
664,341.13
99,651.17
763,992.29
Jumlah
(Rp)
7
82,500.00
16,500.00
1,960.00
6,225.00
107,185.00
342,240.00
82,800.00
104,948.15
661.13
530,649.27
AHSP.Pus Air.214
637,834.27
95,675.14
733,509.41
Jumlah
(Rp)
7
66,000.00
15,000.00
1,400.00
4,500.00
86,900.00
342,240.00
82,800.00
104,948.15
661.13
530,649.27
80,000.00
80,000.00
697,549.27
104,632.39
802,181.66
Jumlah
(Rp)
7
82,500.00
16,500.00
1,960.00
6,225.00
107,185.00
370,760.00
79,900.00
105,466.67
AHSP.Pus Air.215
661.13
556,787.79
663,972.79
99,595.92
763,568.71
Jumlah
(Rp)
7
66,000.00
15,000.00
1,400.00
4,500.00
86,900.00
370,760.00
79,900.00
105,466.67
661.13
556,787.79
80,000.00
80,000.00
723,687.79
108,553.17
832,240.96
Jumlah
(Rp)
7
82,500.00
16,500.00
1,960.00
6,225.00
107,185.00
404,240.00
AHSP.Pus Air.216
76,000.00
106,711.11
661.13
587,612.24
694,797.24
104,219.59
799,016.82
Jumlah
(Rp)
7
66,000.00
15,000.00
1,400.00
4,500.00
86,900.00
404,240.00
76,000.00
106,711.11
661.13
587,612.24
80,000.00
80,000.00
754,512.24
113,176.84
867,689.07
Jumlah
(Rp)
7
50,000.00
8,280.00
1,260.00
3,750.00
63,290.00
710,000.00
AHSP.Pus Air.217
710,000.00
24,000.00
24,000.00
797,290.00
119,593.50
916,883.50
Jumlah
(Rp)
7
82,500.00
16,500.00
1,960.00
6,225.00
107,185.00
436,480.00
73,100.00
106,918.52
661.13
617,159.64
724,344.64
108,651.70
832,996.34
Jumlah
(Rp)
7
66,000.00
15,000.00
1,400.00
4,500.00
86,900.00
436,480.00
AHSP.Pus Air.218
73,100.00
106,918.52
661.13
617,159.64
80,000.00
80,000.00
784,059.64
117,608.95
901,668.59
Jumlah
(Rp)
7
50,000.00
8,280.00
1,260.00
3,750.00
63,290.00
730,000.00
730,000.00
24,000.00
24,000.00
817,290.00
122,593.50
939,883.50
Jumlah
(Rp)
7
82,500.00
16,500.00
1,960.00
6,225.00
107,185.00
460,040.00
AHSP.Pus Air.219
69,800.00
108,577.78
661.13
639,078.90
746,263.90
111,939.59
858,203.49
Jumlah
(Rp)
7
66,000.00
15,000.00
1,400.00
4,500.00
86,900.00
460,040.00
69,800.00
108,577.78
661.13
639,078.90
80,000.00
80,000.00
805,978.90
120,896.84
926,875.74
Jumlah
(Rp)
7
50,000.00
8,280.00
1,260.00
3,750.00
63,290.00
AHSP.Pus Air.220
750,000.00
750,000.00
24,000.00
24,000.00
837,290.00
125,593.50
962,883.50
Jumlah
(Rp)
7
82,500.00
16,500.00
1,960.00
6,225.00
107,185.00
476,160.00
69,200.00
107,748.15
661.13
653,769.27
760,954.27
114,143.14
875,097.41
Jumlah
(Rp)
7
66,000.00
15,000.00
1,400.00
4,500.00
86,900.00
476,160.00
69,200.00
AHSP.Pus Air.221
107,748.15
661.13
653,769.27
80,000.00
80,000.00
820,669.27
123,100.39
943,769.66
Jumlah
(Rp)
7
50,000.00
8,280.00
1,260.00
3,750.00
63,290.00
765,000.00
765,000.00
24,000.00
24,000.00
852,290.00
127,843.50
980,133.50
Jumlah
(Rp)
7
82,500.00
16,500.00
1,960.00
6,225.00
107,185.00
503,440.00
68,400.00
106,400.00
AHSP.Pus Air.222
661.13
678,901.13
786,086.13
117,912.92
903,999.04
Jumlah
(Rp)
7
66,000.00
15,000.00
1,400.00
4,500.00
86,900.00
503,440.00
68,400.00
106,400.00
661.13
678,901.13
80,000.00
80,000.00
845,801.13
126,870.17
972,671.29
Jumlah
(Rp)
7
50,000.00
8,280.00
1,260.00
3,750.00
63,290.00
775,000.00
775,000.00
AHSP.Pus Air.223
24,000.00
24,000.00
862,290.00
129,343.50
991,633.50
Jumlah
(Rp)
7
82,500.00
16,500.00
1,960.00
6,225.00
107,185.00
512,120.00
68,100.00
105,881.48
661.13
36,000.00
722,762.61
829,947.61
124,492.14
954,439.75
Jumlah
(Rp)
7
66,000.00
15,000.00
1,400.00
4,500.00
86,900.00
512,120.00
68,100.00
105,881.48
661.13
AHSP.Pus Air.224
36,000.00
722,762.61
80,000.00
80,000.00
889,662.61
133,449.39
1,023,112.00
Jumlah
(Rp)
7
50,000.00
8,280.00
1,260.00
3,750.00
63,290.00
800,000.00
800,000.00
24,000.00
24,000.00
887,290.00
133,093.50
1,020,383.50
Jumlah
(Rp)
7
105,000.00
21,000.00
2,450.00
7,875.00
136,325.00
544,360.00
67,000.00
104,325.93
661.13
AHSP.Pus Air.225
716,347.05
852,672.05
127,900.81
980,572.86
Jumlah
(Rp)
7
84,000.00
15,780.00
1,750.00
5,550.00
107,080.00
544,360.00
67,000.00
104,325.93
661.13
716,347.05
80,000.00
80,000.00
903,427.05
135,514.06
1,038,941.11
Jumlah
(Rp)
7
63,000.00
10,500.00
1,470.00
4,725.00
79,695.00
817,500.00
817,500.00
24,000.00
AHSP.Pus Air.226
24,000.00
921,195.00
138,179.25
1,059,374.25
Jumlah
(Rp)
7
105,000.00
21,000.00
2,450.00
7,875.00
136,325.00
555,520.00
66,700.00
103,703.70
661.13
726,584.83
862,909.83
129,436.47
992,346.30
Jumlah
(Rp)
7
84,000.00
15,780.00
1,750.00
5,550.00
107,080.00
1,240.00
66,700.00
103,703.70
661.13
172,304.83
AHSP.Pus Air.227
80,000.00
80,000.00
359,384.83
53,907.72
413,292.55
Jumlah
(Rp)
7
63,000.00
10,500.00
1,470.00
4,725.00
79,695.00
834,000.00
834,000.00
24,000.00
24,000.00
937,695.00
140,654.25
1,078,349.25
Jumlah
(Rp)
7
20,500.00
1,500.00
22,000.00
22,000.00
3,300.00
AHSP.Pus Air.228
25,300.00
Jumlah
(Rp)
7
12,500.00
12,500.00
13,475.00
13,475.00
25,975.00
3,896.25
29,871.25
Jumlah
(Rp)
7
25,000.00
1,875.00
26,875.00
13,475.00
13,475.00
40,350.00
6,052.50
46,402.50
Jumlah
(Rp)
7
25,000.00
1,875.00
AHSP.Pus Air.229
26,875.00
26,875.00
4,031.25
30,906.25
Jumlah
(Rp)
7
10,000.00
750.00
10,750.00
24,000.00
24,000.00
34,750.00
5,212.50
39,962.50
Jumlah
(Rp)
7
12,500.00
750.00
13,250.00
13,250.00
1,987.50
15,237.50
Jumlah
(Rp)
AHSP.Pus Air.230
Jumlah
(Rp)
7
10,000.00
750.00
10,750.00
24,000.00
24,000.00
34,750.00
5,212.50
39,962.50
Jumlah
(Rp)
7
35,000.00
42,000.00
4,900.00
3,000.00
84,900.00
1,050,000.00
22,500.00
1,072,500.00
1,157,400.00
173,610.00
1,331,010.00
Jumlah
(Rp)
7
12,500.00
15,000.00
AHSP.Pus Air.231
1,400.00
750.00
29,650.00
2,524,500.00
7,500.00
2,532,000.00
2,561,650.00
384,247.50
2,945,897.50
Jumlah
(Rp)
7
15,000.00
6,000.00
1,500.00
22,500.00
22,500.00
3,375.00
25,875.00
Jumlah
(Rp)
7
10,000.00
2,400.00
1,500.00
13,900.00
AHSP.Pus Air.232
23,375.00
23,375.00
37,275.00
5,591.25
42,866.25
Jumlah
(Rp)
7
15,000.00
6,000.00
1,500.00
22,500.00
23,375.00
23,375.00
45,875.00
6,881.25
52,756.25
Jumlah
(Rp)
7
15,000.00
6,000.00
1,500.00
22,500.00
59,570.00
59,570.00
82,070.00
AHSP.Pus Air.233
12,310.50
94,380.50
Jumlah
(Rp)
7
25,000.00
30,000.00
3,500.00
2,250.00
60,750.00
3,832,500.00
125,000.00
15,000.00
3,972,500.00
20,250.00
20,250.00
4,053,500.00
608,025.00
4,661,525.00
mm (tanpa perancah)
Jumlah
(Rp)
7
10,000.00
30,000.00
3,500.00
750.00
44,250.00
47,250.00
117,400.00
3,125.00
900.00
168,675.00
AHSP.Pus Air.234
212,925.00
31,938.75
244,863.75
ien menjadi 0,20 (Multiflex) dan 0,015 (Kaso)
(tanpa perancah)
Jumlah
(Rp)
7
33,000.00
19,800.00
2,310.00
2,475.00
57,585.00
281,930.00
117,400.00
5,000.00
900.00
405,230.00
462,815.00
69,422.25
532,237.25
ien menjadi 0,025 (papan) dan 0,015 (Kaso)
12,500.00
36,000.00
4,200.00
750.00
53,450.00
47,250.00
117,400.00
4,375.00
7,200.00
176,225.00
AHSP.Pus Air.235
229,675.00
34,451.25
264,126.25
ien menjadi 0,20 (Multiflex) dan 0,015 (Kaso)
Jumlah
(Rp)
7
12,500.00
36,000.00
4,200.00
900.00
53,600.00
587,000.00
4,375.00
644,975.00
698,575.00
104,786.25
803,361.25
ien menjadi 0,06 (Kaso)
Jumlah
(Rp)
7
12,500.00
36,000.00
4,200.00
900.00
53,600.00
690,000.00
4,375.00
694,375.00
AHSP.Pus Air.236
747,975.00
112,196.25
860,171.25
Jumlah
(Rp)
7
10,000.00
30,000.00
3,500.00
750.00
44,250.00
47,250.00
821,800.00
860,171.25
4,375.00
7,200.00
1,740,796.25
1,785,046.25
267,756.94
2,052,803.19
Jumlah
(Rp)
7
12,500.00
36,000.00
4,200.00
900.00
53,600.00
821,800.00
4,375.00
826,175.00
879,775.00
131,966.25
AHSP.Pus Air.237
1,011,741.25
Jumlah
(Rp)
7
12,500.00
36,000.00
4,200.00
900.00
53,600.00
690,000.00
4,375.00
694,375.00
747,975.00
112,196.25
860,171.25
Jumlah
(Rp)
7
10,000.00
30,000.00
3,500.00
750.00
44,250.00
47,250.00
821,800.00
3,125.00
900.00
873,075.00
917,325.00
137,598.75
1,054,923.75
AHSP.Pus Air.238
Jumlah
(Rp)
7
33,000.00
19,800.00
2,310.00
2,475.00
57,585.00
166,980.00
1,056,600.00
5,000.00
900.00
1,229,480.00
1,287,065.00
193,059.75
1,480,124.75
Jumlah
(Rp)
7
10,000.00
30,000.00
3,500.00
750.00
44,250.00
47,250.00
821,800.00
3,125.00
900.00
873,075.00
917,325.00
137,598.75
1,054,923.75
AHSP.Pus Air.239
Jumlah
(Rp)
7
33,000.00
19,800.00
2,310.00
2,475.00
57,585.00
1,440.00
1,056,600.00
5,000.00
900.00
1,063,940.00
1,121,525.00
168,228.75
1,289,753.75
Jumlah
(Rp)
7
10,000.00
30,000.00
3,500.00
750.00
44,250.00
47,250.00
821,800.00
3,125.00
900.00
873,075.00
917,325.00
137,598.75
1,054,923.75
Jumlah
(Rp)
AHSP.Pus Air.240
Jumlah
(Rp)
7
33,000.00
19,800.00
2,310.00
2,475.00
57,585.00
1,000.00
1,056,600.00
5,000.00
900.00
1,063,500.00
1,121,085.00
168,162.75
1,289,247.75
Jumlah
(Rp)
7
30,000.00
2,250.00
32,250.00
32,250.00
4,837.50
37,087.50
Jumlah
(Rp)
7
30,000.00
2,250.00
AHSP.Pus Air.241
32,250.00
32,250.00
4,837.50
37,087.50
Jumlah
(Rp)
7
40,000.00
3,000.00
43,000.00
43,000.00
6,450.00
49,450.00
Jumlah
(Rp)
7
40,000.00
3,000.00
43,000.00
43,000.00
6,450.00
49,450.00
Jumlah
(Rp)
AHSP.Pus Air.242
Jumlah
(Rp)
7
40,000.00
3,000.00
43,000.00
43,000.00
6,450.00
49,450.00
Jumlah
(Rp)
7
100,000.00
3,750.00
103,750.00
30,000.00
30,000.00
10,000.00
9,000.00
112,500.00
131,500.00
265,250.00
39,787.50
305,037.50
Jumlah
(Rp)
7
30,000.00
2,250.00
32,250.00
AHSP.Pus Air.243
21,600.00
5,000.00
4,500.00
45,000.00
76,100.00
108,350.00
16,252.50
124,602.50
Jumlah
(Rp)
7
2,500.00
1,800.00
210.00
225.00
4,735.00
78,750.00
150.00
78,900.00
83,635.00
12,545.25
96,180.25
Jumlah
(Rp)
7
2,750.00
2,100.00
280.00
300.00
5,430.00
94,500.00
AHSP.Pus Air.244
150.00
94,650.00
100,080.00
15,012.00
115,092.00
Jumlah
(Rp)
7
2,750.00
2,400.00
280.00
300.00
5,730.00
120,750.00
150.00
120,900.00
126,630.00
18,994.50
145,624.50
Jumlah
(Rp)
7
3,000.00
3,000.00
350.00
375.00
6,725.00
131,250.00
300.00
131,550.00
AHSP.Pus Air.245
138,275.00
20,741.25
159,016.25
A.4
A.4.1
F.01
F.02
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
Tenaga Kerja
Pekerja
Mandor
Operator Crane
L.01
L.15
L.19
OH
OH
OH
B
1
Bahan
Tiang Pancang kayu dia 20 cm
M.67
C
1
2
3
Peralatan
Tripod tinggi 5 m
Alat pancang Hammer 2 ton
Alat penyambung tiang pancang
E.39 Hari-sewa
E.40 Hari-sewa
E.48
bh
D
E
F
0.016
50,000.00
0.008
75,000.00
0.016
125,000.00
Jumlah Harga Tenaga Kerja
1.050
350,000.00
Jumlah Harga Bahan
0.020
325,000.00
0.020
442,000.00
0.250
200,000.00
Jumlah Harga Peralatan
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.15
L.19
L.14
OH
OH
OH
OH
0.025
50,000.00
0.010
75,000.00
0.025
125,000.00
0.025
60,000.00
Jumlah Harga Tenaga Kerja
M.126
M.114
m
kg
1.01
500,000.00
0.15
24,750.00
Jumlah Harga Bahan
A
1
2
3
4
Tenaga Kerja
Pekerja
Mandor
Operator Crane
Tukang las listrik
B
1
2
Bahan
Tiang Pancang baja dia 30 cm
Kawat las listrik
C
1
2
3
Peralatan
Crane kecil
Alat pancang Hammer 2 ton
Las listrik diesel (termasuk solar)
E.42 Hari-sewa
E.40 Hari-sewa
E.44 Hari-sewa
0.025
730,000.00
0.025
442,000.00
0.025
235,000.00
Jumlah Harga Peralatan
E
F
F.03
F.04
Overhead + Profit
Harga Satuan Pekerjaan per - m' (D+E)
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.15
L.19
L.14
OH
OH
OH
OH
0.025
50,000.00
0.010
75,000.00
0.025
125,000.00
0.025
60,000.00
Jumlah Harga Tenaga Kerja
M.127
M.114
m
kg
1.01
575,000.00
0.15
24,750.00
Jumlah Harga Bahan
A
1
2
3
4
Tenaga Kerja
Pekerja
Mandor
Operator Crane
Tukang las listrik
B
1
2
Bahan
Tiang Pancang baja kotak 30 x 30 cm
Kawat las listrik
C
1
2
3
Peralatan
Crane kecil
Alat pancang Hammer 2 ton
Las listrik diesel (termasuk solar)
D
E
F
E.42 Hari-sewa
E.40 Hari-sewa
E.44 Hari-sewa
0.025
730,000.00
0.025
442,000.00
0.025
235,000.00
Jumlah Harga Peralatan
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
Tenaga Kerja
Pekerja
Mandor
Operator Crane
L.01
L.15
L.19
OH
OH
OH
B
1
Bahan
Tiang Pancang beton tulang 30x30 cm
M.33
C
1
2
3
Peralatan
Crane kecil
Alat pancang Hammer 2 ton
Alat penyambung tiang pancang
E.42 Hari-sewa
E.40 Hari-sewa
E.48
bh
0.035
50,000.00
0.005
75,000.00
0.035
125,000.00
Jumlah Harga Tenaga Kerja
1.03
230,000.00
Jumlah Harga Bahan
0.035
730,000.00
0.035
442,000.00
0.250
200,000.00
Jumlah Harga Peralatan
E
F
F.05
Overhead + Profit
Harga Satuan Pekerjaan per - m' (D+E)
15% x D
F.06
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
Tenaga Kerja
Pekerja
Mandor
Operator Crane
L.01
L.15
L.19
OH
OH
OH
B
1
Bahan
Tiang Pancang beton tulang 40x40 cm
M.34
C
1
2
3
Peralatan
Crane besar
Alat pancang Hammer 2 ton
Alat penyambung tiang pancang
D
E
F
E.43 Hari-sewa
E.40 Hari-sewa
E.48
bh
0.050
50,000.00
0.005
75,000.00
0.050
125,000.00
Jumlah Harga Tenaga Kerja
1.03
400,000.00
Jumlah Harga Bahan
0.050
935,000.00
0.050
442,000.00
0.250
200,000.00
Jumlah Harga Peralatan
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.15
L.19
OH
OH
OH
M.66
A
1
2
3
B
Tenaga Kerja
Pekerja
Mandor
Operator Crane
Bahan
1 Kayu dolken dia 8 - 10 cm
C
1
2
3
Peralatan
Tripod tinggi 5 m
Alat pancang Hammer 1 ton
Alat penyambung tiang pancang
D
E
F
E.39 Hari-sewa
E.40 Hari-sewa
E.48
bh
0.025
50,000.00
0.005
75,000.00
0.025
125,000.00
Jumlah Harga Tenaga Kerja
1.05
38,333.33
Jumlah Harga Bahan
0.025
325,000.00
0.025
442,000.00
0.250
200,000.00
Jumlah Harga Peralatan
15% x D
F.07
F.08
F.09
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.15
L.19
L.14
OH
OH
OH
OH
M.129
A
1
2
3
4
Tenaga Kerja
Pekerja
Mandor
Operator Crane
Tukang las listrik
B
1
Bahan
Turap baja profi larsen lebar 350 mm
C
1
2
3
Peralatan
Crane kecil
Alat pancang Hammer 1 ton
Las listrik diesel (termasuk solar)
D
E
F
E.42 Hari-sewa
E.40 Hari-sewa
E.44 Hari-sewa
0.035
50,000.00
0.005
75,000.00
0.035
125,000.00
0.035
60,000.00
Jumlah Harga Tenaga Kerja
1.05
140,000.00
Jumlah Harga Bahan
0.035
730,000.00
0.035
442,000.00
0.025
235,000.00
Jumlah Harga Peralatan
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
Tenaga Kerja
Pekerja
Mandor
Operator Crane
L.01
L.15
L.19
OH
OH
OH
B
1
Bahan
Turap beton tulang pre-cast 30x12 cm
M.41
C
1
2
3
Peralatan
Crane kecil
Alat pancang Hammer 1 ton
Alat penyambung tiang pancang
E.42 Hari-sewa
E.40 Hari-sewa
E.48
bh
D
E
F
0.050
50,000.00
0.005
75,000.00
0.050
125,000.00
Jumlah Harga Tenaga Kerja
1.030
200,000.00
Jumlah Harga Bahan
0.050
730,000.00
0.050
442,000.00
0.350
200,000.00
Jumlah Harga Peralatan
15% x D
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
Tenaga Kerja
Pekerja
Mandor
Operator Crane
L.01
L.15
L.19
OH
OH
OH
B
1
Bahan
Turap beton tulang pre-cast 40x15 cm
M.42
C
1
2
3
Peralatan
Crane kecil
Alat pancang Hammer 1 ton
Alat penyambung tiang pancang
E.42 Hari-sewa
E.40 Hari-sewa
E.48
bh
D
E
F
0.065
50,000.00
0.005
75,000.00
0.065
125,000.00
Jumlah Harga Tenaga Kerja
1.030
300,000.00
Jumlah Harga Bahan
0.065
730,000.00
0.065
442,000.00
0.350
200,000.00
Jumlah Harga Peralatan
15% x D
A.4.2
F.10
F.11
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
Tenaga Kerja
Pekerja
Mandor
Operator Crane
L.01
L.15
L.19
OH
OH
OH
B
1
Bahan
Tiang Pancang kayu dia 20 cm
M.67
C
1
2
3
Peralatan
Crane kecil
Alat pancang tenaga uap 8 ton
Alat penyambung tiang pancang
E.39 Hari-sewa
E.40 Hari-sewa
E.48
bh
D
E
F
0.016
50,000.00
0.008
75,000.00
0.016
125,000.00
Jumlah Harga Tenaga Kerja
1.050
350,000.00
Jumlah Harga Bahan
0.020
325,000.00
0.020
442,000.00
0.250
200,000.00
Jumlah Harga Peralatan
15% x D
F.12
F.13
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.15
L.19
L.14
OH
OH
OH
OH
0.025
50,000.00
0.010
75,000.00
0.025
125,000.00
0.025
60,000.00
Jumlah Harga Tenaga Kerja
M.126
M.114
m
kg
1.010
500,000.00
0.150
24,750.00
Jumlah Harga Bahan
A
1
2
3
4
Tenaga Kerja
Pekerja
Mandor
Operator Crane
Tukang las listrik
B
1
2
Bahan
Tiang Pancang baja dia 30 cm
Kawat las listrik
C
1
2
3
Peralatan
Crane besar
Alat pancang tenaga uap 8 ton
Las listrik diesel (termasuk solar)
D
E
F
E.43 Hari-sewa
E.40 Hari-sewa
E.44 Hari-sewa
0.025
730,000.00
0.025
442,000.00
0.025
235,000.00
Jumlah Harga Peralatan
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.15
L.19
L.14
OH
OH
OH
OH
0.025
50,000.00
0.010
75,000.00
0.025
125,000.00
0.025
60,000.00
Jumlah Harga Tenaga Kerja
M.126
M.114
m
kg
1.010
500,000.00
0.150
24,750.00
Jumlah Harga Bahan
A
1
2
3
4
Tenaga Kerja
Pekerja
Mandor
Operator Crane
Tukang las listrik
B
1
2
Bahan
Tiang Pancang baja kotak 30 x 30 cm
Kawat las listrik
C
1
2
3
Peralatan
Crane besar
Alat pancang tenaga uap 8 ton
Las listrik diesel (termasuk solar)
D
E
F
E.43 Hari-sewa
E.40 Hari-sewa
E.44 Hari-sewa
0.025
935,000.00
0.025
442,000.00
0.025
235,000.00
Jumlah Harga Peralatan
15% x D
Per-m' panjang tiang pancang beton bertulang ukuran 30 x 30 cm untuk sampai dengan per-satuan 2,5 ton daya
dukung tiang pancang beban normal dan untuk maksimum 1 m jarak antar tiang dalam satu group tiang pancang
F.14
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
Tenaga Kerja
Pekerja
Mandor
Operator Crane
L.01
L.15
L.19
OH
OH
OH
B
1
Bahan
Tiang Pancang beton tulang 30x30 cm
M.33
C
1
2
3
Peralatan
Crane besar
Alat pancang tenaga uap 8 ton
Alat penyambung tiang pancang
E.43 Hari-sewa
E.40 Hari-sewa
E.44
bh
D
E
F
0.035
50,000.00
0.005
75,000.00
0.035
125,000.00
Jumlah Harga Tenaga Kerja
1.030
230,000.00
Jumlah Harga Bahan
0.035
935,000.00
0.035
442,000.00
0.250
235,000.00
Jumlah Harga Peralatan
15% x D
F.15
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
Tenaga Kerja
Pekerja
Mandor
Operator Crane
L.01
L.15
L.19
OH
OH
OH
B
1
Bahan
Tiang Pancang beton tulang 40x40 cm
M.38
C
1
2
3
Peralatan
Crane besar
Alat pancang tenaga uap 8 ton
Alat penyambung tiang pancang
E.43 Hari-sewa
E.40 Hari-sewa
E.44
bh
D
E
F
0.050
50,000.00
0.005
75,000.00
0.050
125,000.00
Jumlah Harga Tenaga Kerja
1.030
504,000.00
Jumlah Harga Bahan
0.050
935,000.00
0.050
442,000.00
0.250
235,000.00
Jumlah Harga Peralatan
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
F.16
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
Tenaga Kerja
Pekerja
Mandor
Operator Crane
L.01
L.15
L.19
OH
OH
OH
B
1
Bahan
Kayu dolken dia 8 - 10 cm
M.66
C
1
2
3
Peralatan
Crane besar
Alat pancang tenaga uap 8 ton
Alat penyambung tiang pancang
E.43 Hari-sewa
E.40 Hari-sewa
E.44
bh
D
E
F
0.025
50,000.00
0.005
75,000.00
0.025
125,000.00
Jumlah Harga Tenaga Kerja
1.050
115,000.00
Jumlah Harga Bahan
0.025
935,000.00
0.025
442,000.00
0.250
235,000.00
Jumlah Harga Peralatan
15% x D
F.17
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.15
L.19
L.14
OH
OH
OH
OH
M.129
A
1
2
3
4
Tenaga Kerja
Pekerja
Mandor
Operator Crane
Tukang las listrik
B
1
Bahan
Turap baja profi larsen lebar 350 mm
C
1
2
3
Peralatan
Crane besar
Alat pancang tenaga uap 8 ton
Las listrik diesel (termasuk solar)
D
E
F
E.43 Hari-sewa
E.40 Hari-sewa
E.44 Hari-sewa
0.035
50,000.00
0.005
75,000.00
0.035
125,000.00
0.035
60,000.00
Jumlah Harga Tenaga Kerja
1.050
140,000.00
Jumlah Harga Bahan
0.035
935,000.00
0.035
442,000.00
0.025
235,000.00
Jumlah Harga Peralatan
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
F.18
A.4.3
A
1
2
3
Tenaga Kerja
Pekerja
Mandor
Operator Crane
L.01
L.15
L.19
OH
OH
OH
B
1
Bahan
Turap beton tulang pre-cast 30x12 cm
M.41
C
1
2
3
Peralatan
Crane besar
Alat pancang tenaga uap 8 ton
Alat penyambung tiang pancang
E.43 Hari-sewa
E.40 Hari-sewa
E.48
bh
D
E
F
0.050
50,000.00
0.005
75,000.00
0.050
125,000.00
Jumlah Harga Tenaga Kerja
1.030
200,000.00
Jumlah Harga Bahan
0.050
935,000.00
0.050
442,000.00
0.350
200,000.00
Jumlah Harga Peralatan
15% x D
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
Tenaga Kerja
Pekerja
Mandor
Operator Crane
L.01
L.15
L.19
OH
OH
OH
B
1
Bahan
Turap beton tulang pre-cast 40x15 cm
M.42
C
1
2
3
Peralatan
Crane besar
Alat pancang tenaga uap 8 ton
Alat penyambung tiang pancang
E.43 Hari-sewa
E.40 Hari-sewa
E.44
bh
D
E
F
0.065
50,000.00
0.005
75,000.00
0.065
125,000.00
Jumlah Harga Tenaga Kerja
1.030
300,000.00
Jumlah Harga Bahan
0.065
935,000.00
0.065
442,000.00
0.350
235,000.00
Jumlah Harga Peralatan
15% x D
F.19
F.20
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
Tenaga Kerja
Pekerja
Mandor
Operator Crane
L.01
L.15
L.19
OH
OH
OH
B
1
Bahan
Tiang Pancang kayu dia 20 cm
M.67
C
1
2
3
Peralatan
Crane kecil
Alat pancang tenaga diesel 8 ton
Alat penyambung tiang pancang
D
E
F
E.42 Hari-sewa
E.46 Hari-sewa
E.48
bh
0.016
50,000.00
0.008
75,000.00
0.016
125,000.00
Jumlah Harga Tenaga Kerja
1.050
350,000.00
Jumlah Harga Bahan
0.020
730,000.00
0.020
850,000.00
0.250
200,000.00
Jumlah Harga Peralatan
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.15
L.19
L.14
OH
OH
OH
OH
0.025
50,000.00
0.010
75,000.00
0.025
125,000.00
0.025
60,000.00
Jumlah Harga Tenaga Kerja
M.126
M.114
m
kg
1.010
500,000.00
0.150
24,750.00
Jumlah Harga Bahan
A
1
2
3
4
Tenaga Kerja
Pekerja
Mandor
Operator Crane
Tukang las listrik
B
1
2
Bahan
Tiang Pancang baja dia 30 cm
Kawat las listrik
C
1
2
3
Peralatan
Crane besar
Alat pancang tenaga diesel 8 ton
Las listrik diesel (termasuk solar)
D
E
F
E.42 Hari-sewa
E.40 Hari-sewa
E.44 Hari-sewa
0.025
730,000.00
0.025
442,000.00
0.025
235,000.00
Jumlah Harga Peralatan
15% x D
F.21
F.22
F.23
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.15
L.19
L.14
OH
OH
OH
OH
0.025
50,000.00
0.010
75,000.00
0.025
125,000.00
0.025
60,000.00
Jumlah Harga Tenaga Kerja
M.127
M.114
m
kg
1.010
575,000.00
0.150
24,750.00
Jumlah Harga Bahan
A
1
2
3
4
Tenaga Kerja
Pekerja
Mandor
Operator Crane
Tukang las listrik
B
1
2
Bahan
Tiang Pancang baja kotak 30 x 30 cm
Kawat las listrik
C
1
2
3
Peralatan
Crane besar
Alat pancang tenaga diesel 8 ton
Las listrik diesel (termasuk solar)
D
E
F
E.42 Hari-sewa
E.40 Hari-sewa
E.44 Hari-sewa
0.025
730,000.00
0.025
442,000.00
0.025
235,000.00
Jumlah Harga Peralatan
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
Tenaga Kerja
Pekerja
Mandor
Operator Crane
L.01
L.15
L.19
OH
OH
OH
B
1
Bahan
Tiang Pancang beton tulang 30x30 cm
M.37
C
1
2
3
Peralatan
Crane besar
Alat pancang tenaga diesel 8 ton
Alat penyambung tiang pancang
E.42 Hari-sewa
E.40 Hari-sewa
E.44
bh
D
E
F
0.035
50,000.00
0.005
75,000.00
0.035
125,000.00
Jumlah Harga Tenaga Kerja
1.030
290,000.00
Jumlah Harga Bahan
0.035
730,000.00
0.035
442,000.00
0.250
235,000.00
Jumlah Harga Peralatan
15% x D
Per-m' panjang tiang pancang beton bertulang ukuran 40 x 40 cm untuk sampai dengan per-satuan 2,5 ton daya
dukung tiang pancang beban normal dan untuk maksimum 1 m jarak antar tiang dalam satu group tiang pancang
F.24
F.25
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
Tenaga Kerja
Pekerja
Mandor
Operator Crane
L.01
L.15
L.19
OH
OH
OH
B
1
Bahan
Tiang Pancang beton tulang 40x40 cm
M.38
C
1
2
3
Peralatan
Crane besar
Alat pancang tenaga diesel 8 ton
Alat penyambung tiang pancang
E.42 Hari-sewa
E.40 Hari-sewa
E.44
bh
D
E
F
0.050
50,000.00
0.005
75,000.00
0.050
125,000.00
Jumlah Harga Tenaga Kerja
1.030
504,000.00
Jumlah Harga Bahan
0.050
730,000.00
0.050
442,000.00
0.250
235,000.00
Jumlah Harga Peralatan
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
Tenaga Kerja
Pekerja
Mandor
Operator Crane
L.01
L.15
L.19
OH
OH
OH
B
1
Bahan
Kayu dolken dia 8 - 10 cm
M.66
C
1
2
3
Peralatan
Crane kecil
Alat pancang tenaga diesel 8 ton
Alat penyambung tiang pancang
E.39 Hari-sewa
E.40 Hari-sewa
E.49
bh
D
E
F
0.025
50,000.00
0.005
75,000.00
0.025
125,000.00
Jumlah Harga Tenaga Kerja
1.050
38,333.33
Jumlah Harga Bahan
0.025
325,000.00
0.025
442,000.00
0.250
25,000.00
Jumlah Harga Peralatan
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
F.26
F.27
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.15
L.19
L.14
OH
OH
OH
OH
M.129
E.40
E.40
E.44
Hari-sewa
A
1
2
3
4
Tenaga Kerja
Pekerja
Mandor
Operator Crane
Tukang las listrik
B
1
Bahan
Turap baja profi larsen lebar 350 mm
C
1
2
3
Peralatan
Crane besar
Alat pancang tenaga diesel 8 ton
Las listrik diesel (termasuk solar)
D
E
F
Hari-sewa
Hari-sewa
0.035
50,000.00
0.005
75,000.00
0.035
125,000.00
0.035
60,000.00
Jumlah Harga Tenaga Kerja
1.050
140,000.00
Jumlah Harga Bahan
0.035
442,000.00
0.035
442,000.00
0.025
235,000.00
Jumlah Harga Peralatan
15% x D
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
Tenaga Kerja
Pekerja
Mandor
Operator Crane
L.01
L.15
L.19
OH
OH
OH
B
1
Bahan
Turap beton tulang pre-cast 30x12 cm
M.41
C
1
2
3
Peralatan
Crane besar
Alat pancang tenaga diesel 8 ton
Alat penyambung tiang pancang
E.40
E.40
E.48
Hari-sewa
D
E
F
Hari-sewa
bh
0.050
50,000.00
0.005
75,000.00
0.050
125,000.00
Jumlah Harga Tenaga Kerja
1.030
200,000.00
Jumlah Harga Bahan
0.050
442,000.00
0.050
442,000.00
0.350
200,000.00
Jumlah Harga Peralatan
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
Tenaga Kerja
Pekerja
Mandor
Operator Crane
L.01
L.15
L.19
OH
OH
OH
B
1
Bahan
Turap beton tulang pre-cast 40x20 cm
M.36
C
1
2
3
Peralatan
Crane besar
Alat pancang tenaga diesel 8 ton
Alat penyambung tiang pancang
E.40
E.40
E.48
Hari-sewa
D
E
F
Hari-sewa
bh
0.065
50,000.00
0.005
75,000.00
0.065
125,000.00
Jumlah Harga Tenaga Kerja
1.030
180,000.00
Jumlah Harga Bahan
0.065
442,000.00
0.065
442,000.00
0.350
200,000.00
Jumlah Harga Peralatan
15% x D
A.4.4
F.28
F.29
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
Tenaga Kerja
Pekerja
Mandor
Operator Crane
L.01
L.15
L.19
OH
OH
OH
B
1
Bahan
Tiang Pancang kayu dia 20 cm
M.67
C
1
2
3
Peralatan
Crane kecil
Alat pancang Kompresor Udara 8 ton
Alat penyambung tiang pancang
E.42 Hari-sewa
E.40 Hari-sewa
E.48
bh
D
E
F
0.016
50,000.00
0.008
75,000.00
0.016
125,000.00
Jumlah Harga Tenaga Kerja
1.050
350,000.00
Jumlah Harga Bahan
0.020
730,000.00
0.020
442,000.00
0.250
200,000.00
Jumlah Harga Peralatan
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
Tenaga Kerja
F.30
F.31
1
2
3
4
Pekerja
Mandor
Operator Crane
Tukang las listrik
L.01
L.15
L.19
L.14
OH
OH
OH
OH
0.025
50,000.00
0.010
75,000.00
0.025
125,000.00
0.025
60,000.00
Jumlah Harga Tenaga Kerja
B
1
2
Bahan
Tiang Pancang baja dia 30 cm
Kawat las listrik
M.126
M.114
m
kg
1.010
500,000.00
0.150
24,750.00
Jumlah Harga Bahan
C
1
2
3
Peralatan
Crane besar
Alat pancang Kompresor Udara 8 ton
Las listrik diesel (termasuk solar)
E.43
E.47
E.44
Hari-sewa
D
E
F
Hari-sewa
Hari-sewa
0.025
935,000.00
0.025
750,000.00
0.025
235,000.00
Jumlah Harga Peralatan
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.15
L.19
L.14
OH
OH
OH
OH
0.025
50,000.00
0.010
75,000.00
0.025
125,000.00
0.025
60,000.00
Jumlah Harga Tenaga Kerja
1.010
575,000.00
0.150
24,750.00
Jumlah Harga Bahan
A
1
2
3
4
Tenaga Kerja
Pekerja
Mandor
Operator Crane
Tukang las listrik
B
1
2
Bahan
Tiang Pancang baja kotak 30 x 30 cm
Kawat las listrik
M.127
M.114
m
kg
C
1
2
3
Peralatan
Crane besar
Alat pancang Kompresor Udara 8 ton
Las listrik diesel (termasuk solar)
E.43
E.40
E.44
Hari-sewa
D
E
F
Hari-sewa
Hari-sewa
0.025
935,000.00
0.025
442,000.00
0.025
235,000.00
Jumlah Harga Peralatan
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
F.32
F.33
A
1
2
3
Tenaga Kerja
Pekerja
Mandor
Operator Crane
L.01
L.15
L.19
OH
OH
OH
B
1
Bahan
Tiang Pancang beton tulang 30x30 cm
M.37
C
1
2
3
Peralatan
Crane besar
Alat pancang Kompresor Udara 8 ton
Alat penyambung tiang pancang
E.42
E.40
E.48
Hari-sewa
D
E
F
Hari-sewa
bh
0.035
50,000.00
0.005
75,000.00
0.035
125,000.00
Jumlah Harga Tenaga Kerja
1.030
290,000.00
Jumlah Harga Bahan
0.035
730,000.00
0.035
442,000.00
0.250
200,000.00
Jumlah Harga Peralatan
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
Tenaga Kerja
Pekerja
Mandor
Operator Crane
L.01
L.15
L.19
OH
OH
OH
B
1
Bahan
Tiang Pancang beton tulang 40x40 cm
M.38
C
1
2
3
Peralatan
Crane besar
Alat pancang Kompresor Udara 8 ton
Alat penyambung tiang pancang
E.43
E.40
E.48
Hari-sewa
D
E
F
Hari-sewa
bh
0.050
50,000.00
0.005
75,000.00
0.050
125,000.00
Jumlah Harga Tenaga Kerja
1.030
504,000.00
Jumlah Harga Bahan
0.050
935,000.00
0.050
442,000.00
0.250
200,000.00
Jumlah Harga Peralatan
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.15
L.19
OH
OH
OH
A
1
2
3
Tenaga Kerja
Pekerja
Mandor
Operator Crane
0.025
0.005
0.025
50,000.00
75,000.00
125,000.00
F.34
F.35
B
1
Bahan
Kayu dolken dia 8 - 10 cm
M.66
C
1
2
3
Peralatan
Crane kecil
Alat pancang Kompresor Udara 8 ton
Alat penyambung tiang pancang
E.42
E.40
E.49
Hari-sewa
D
E
F
Hari-sewa
bh
1.050
115,000.00
Jumlah Harga Bahan
0.025
730,000.00
0.025
442,000.00
0.250
25,000.00
Jumlah Harga Peralatan
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.15
L.19
L.14
OH
OH
OH
OH
A
1
2
3
4
Tenaga Kerja
Pekerja
Mandor
Operator Crane
Tukang las listrik
B
1
Bahan
Turap baja profi larsen lebar 350 mm
M.129
C
1
2
3
Peralatan
Crane besar
Alat pancang Kompresor Udara 8 ton
Las listrik diesel (termasuk solar)
E.40
E.40
E.44
Hari-sewa
D
E
F
Hari-sewa
Hari-sewa
0.035
50,000.00
0.005
75,000.00
0.035
125,000.00
0.035
60,000.00
Jumlah Harga Tenaga Kerja
1.050
140,000.00
Jumlah Harga Bahan
0.035
442,000.00
0.035
442,000.00
0.025
235,000.00
Jumlah Harga Peralatan
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
Tenaga Kerja
Pekerja
Mandor
Operator Crane
L.01
L.15
L.19
OH
OH
OH
B
1
Bahan
Turap beton tulang pre-cast 30x12 cm
M.35
0.050
50,000.00
0.005
75,000.00
0.050
125,000.00
Jumlah Harga Tenaga Kerja
1.030
100,000.00
F.36
C
1
2
3
Peralatan
Crane besar
Alat pancang Kompresor Udara 8 ton
Alat penyambung tiang pancang
D
E
F
E.40
E.40
E.48
0.050
442,000.00
0.050
442,000.00
0.350
200,000.00
Jumlah Harga Peralatan
Hari-sewa
Hari-sewa
bh
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
Tenaga Kerja
Pekerja
Mandor
Operator Crane
L.01
L.15
L.19
OH
OH
OH
B
1
Bahan
Turap beton tulang pre-cast 40x20 cm
M.36
C
1
2
3
Peralatan
Crane besar
Alat pancang Kompresor Udara 8 ton
Alat penyambung tiang pancang
E.42
E.40
E.48
Hari-sewa
D
E
F
0.065
50,000.00
0.005
75,000.00
0.065
125,000.00
Jumlah Harga Tenaga Kerja
Hari-sewa
bh
1.030
180,000.00
Jumlah Harga Bahan
0.065
730,000.00
0.065
442,000.00
0.350
200,000.00
Jumlah Harga Peralatan
15% x D
800.00
600.00
2,000.00
3,400.00
367,500.00
367,500.00
6,500.00
8,840.00
50,000.00
65,340.00
436,240.00
65,436.00
501,676.00
1,250.00
750.00
3,125.00
1,500.00
6,625.00
505,000.00
3,712.50
508,712.50
18,250.00
11,050.00
5,875.00
35,175.00
550,512.50
82,576.88
633,089.38
1,250.00
750.00
3,125.00
1,500.00
6,625.00
580,750.00
3,712.50
584,462.50
18,250.00
11,050.00
5,875.00
35,175.00
626,262.50
93,939.38
720,201.88
1,750.00
375.00
4,375.00
6,500.00
236,900.00
236,900.00
25,550.00
15,470.00
50,000.00
91,020.00
334,420.00
50,163.00
384,583.00
2,500.00
375.00
6,250.00
9,125.00
412,000.00
412,000.00
46,750.00
22,100.00
50,000.00
118,850.00
539,975.00
80,996.25
620,971.25
1,250.00
375.00
3,125.00
4,750.00
40,250.00
40,250.00
8,125.00
11,050.00
50,000.00
69,175.00
114,175.00
17,126.25
131,301.25
1,750.00
375.00
4,375.00
2,100.00
8,600.00
147,000.00
147,000.00
25,550.00
15,470.00
5,875.00
46,895.00
202,495.00
30,374.25
232,869.25
2,500.00
375.00
6,250.00
9,125.00
206,000.00
206,000.00
36,500.00
22,100.00
70,000.00
128,600.00
343,725.00
51,558.75
395,283.75
Jumlah
(Rp)
7
3,250.00
375.00
8,125.00
11,750.00
309,000.00
309,000.00
47,450.00
28,730.00
70,000.00
146,180.00
466,930.00
70,039.50
536,969.50
800.00
600.00
2,000.00
3,400.00
367,500.00
367,500.00
6,500.00
8,840.00
50,000.00
65,340.00
436,240.00
65,436.00
501,676.00
Jumlah
(Rp)
7
1,250.00
750.00
3,125.00
1,500.00
6,625.00
505,000.00
3,712.50
508,712.50
18,250.00
11,050.00
5,875.00
35,175.00
550,512.50
82,576.88
633,089.38
1,250.00
750.00
3,125.00
1,500.00
6,625.00
505,000.00
3,712.50
508,712.50
23,375.00
11,050.00
5,875.00
40,300.00
555,637.50
83,345.63
638,983.13
1,750.00
375.00
4,375.00
6,500.00
236,900.00
236,900.00
32,725.00
15,470.00
58,750.00
106,945.00
350,345.00
52,551.75
402,896.75
2,500.00
375.00
6,250.00
9,125.00
519,120.00
519,120.00
46,750.00
22,100.00
58,750.00
127,600.00
655,845.00
98,376.75
754,221.75
Jumlah
(Rp)
7
1,250.00
375.00
3,125.00
4,750.00
120,750.00
120,750.00
23,375.00
11,050.00
58,750.00
93,175.00
218,675.00
32,801.25
251,476.25
1,750.00
375.00
4,375.00
2,100.00
8,600.00
147,000.00
147,000.00
32,725.00
15,470.00
5,875.00
54,070.00
209,670.00
31,450.50
241,120.50
2,500.00
375.00
6,250.00
9,125.00
206,000.00
206,000.00
46,750.00
22,100.00
70,000.00
138,850.00
353,975.00
53,096.25
407,071.25
3,250.00
375.00
8,125.00
11,750.00
309,000.00
309,000.00
60,775.00
28,730.00
82,250.00
171,755.00
492,505.00
73,875.75
566,380.75
800.00
600.00
2,000.00
3,400.00
367,500.00
367,500.00
14,600.00
17,000.00
50,000.00
81,600.00
452,500.00
67,875.00
520,375.00
1,250.00
750.00
3,125.00
1,500.00
6,625.00
505,000.00
3,712.50
508,712.50
18,250.00
11,050.00
5,875.00
35,175.00
550,512.50
82,576.88
633,089.38
1,250.00
750.00
3,125.00
1,500.00
6,625.00
580,750.00
3,712.50
584,462.50
18,250.00
11,050.00
5,875.00
35,175.00
626,262.50
93,939.38
720,201.88
1,750.00
375.00
4,375.00
6,500.00
298,700.00
298,700.00
25,550.00
15,470.00
58,750.00
99,770.00
404,970.00
60,745.50
465,715.50
2,500.00
375.00
6,250.00
9,125.00
519,120.00
519,120.00
36,500.00
22,100.00
58,750.00
117,350.00
645,595.00
96,839.25
742,434.25
1,250.00
375.00
3,125.00
4,750.00
40,250.00
40,250.00
8,125.00
11,050.00
6,250.00
25,425.00
70,425.00
10,563.75
80,988.75
Jumlah
(Rp)
7
1,750.00
375.00
4,375.00
2,100.00
8,600.00
147,000.00
147,000.00
15,470.00
15,470.00
5,875.00
36,815.00
192,415.00
28,862.25
221,277.25
2,500.00
375.00
6,250.00
9,125.00
206,000.00
206,000.00
22,100.00
22,100.00
70,000.00
114,200.00
329,325.00
49,398.75
378,723.75
3,250.00
375.00
8,125.00
11,750.00
185,400.00
185,400.00
28,730.00
28,730.00
70,000.00
127,460.00
324,610.00
48,691.50
373,301.50
800.00
600.00
2,000.00
3,400.00
367,500.00
367,500.00
14,600.00
8,840.00
50,000.00
73,440.00
444,340.00
66,651.00
510,991.00
1,250.00
750.00
3,125.00
1,500.00
6,625.00
505,000.00
3,712.50
508,712.50
23,375.00
18,750.00
5,875.00
48,000.00
563,337.50
84,500.63
647,838.13
1,250.00
750.00
3,125.00
1,500.00
6,625.00
580,750.00
3,712.50
584,462.50
23,375.00
11,050.00
5,875.00
40,300.00
631,387.50
94,708.13
726,095.63
1,750.00
375.00
4,375.00
6,500.00
298,700.00
298,700.00
25,550.00
15,470.00
50,000.00
91,020.00
396,220.00
59,433.00
455,653.00
2,500.00
375.00
6,250.00
9,125.00
519,120.00
519,120.00
46,750.00
22,100.00
50,000.00
118,850.00
647,095.00
97,064.25
744,159.25
1,250.00
375.00
3,125.00
4,750.00
120,750.00
120,750.00
18,250.00
11,050.00
6,250.00
35,550.00
161,050.00
24,157.50
185,207.50
1,750.00
375.00
4,375.00
2,100.00
8,600.00
147,000.00
147,000.00
15,470.00
15,470.00
5,875.00
36,815.00
192,415.00
28,862.25
221,277.25
2,500.00
375.00
6,250.00
9,125.00
103,000.00
103,000.00
22,100.00
22,100.00
70,000.00
114,200.00
226,325.00
33,948.75
260,273.75
3,250.00
375.00
8,125.00
11,750.00
185,400.00
185,400.00
47,450.00
28,730.00
70,000.00
146,180.00
343,330.00
51,499.50
394,829.50
AHSP.Pus Air.282
A.1
D.01
Kistdam pasir/tanah dibungkus karung plastik bagor (sebesar karung beras 25 kg) uk. 43 cm x 65 cm (1 bu
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.15
OH
OH
0.020
50,000.00
0.005
75,000.00
Jumlah Harga Tenaga Kerja
M.156
M.157
M.09
bh
m
m3
1.000
7,500.00
2.000
500.00
0.070
70,000.00
Jumlah Harga Bahan
A
1
2
Tenaga Kerja
Pekerja
Mandor
B
1
2
3
Bahan
Karung plastik / bagor
Tali rapia / plastik
Sewa pasir (50% harga pasir)
Peralatan
Jumlah Harga Peralatan
D
E
F
D.02
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.06
L.15
OH
OH
OH
0.050
50,000.00
0.100
60,000.00
0.005
75,000.00
Jumlah Harga Tenaga Kerja
M.58
M.100
m3
kg
0.075 5,870,000.00
0.650
12,500.00
Jumlah Harga Bahan
A
1
2
3
Tenaga Kerja
Pekerja
Tukang kayu
Mandor
B
1
2
Bahan
Kayu kaso ukuran 5/7 kelas II
Paku campuran 5 cm & 7 cm
Peralatan
Jumlah Harga Peralatan
D
E
F
15% x D
AHSP.Pus Air.283
D.03
Kerangka baja profil L.40.40.4 atau profil union berlubang untuk 1 m3 kistdam pasir/tanah uk. 23 cm x 65
Diasumsikan karung plastik setelah diisi menjadi berukuran 16,5 cm x 30 cm x 50 cm atau untuk 36 buah ka
setiap m3. AHSP ini dihitung berdasarkan tinggi tumpukan kistdam 3 m dengan pemancangan baja profil sedal
m ke dalam tanah
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.08
L.15
OH
OH
OH
M.96
20.400
M.136
bh
75.000
2,200.00
Jumlah Harga Bahan
A
1
2
3
Tenaga Kerja
Pekerja
Tukang besi
Mandor
B
1
2
Bahan
Baja profil L.40.40.4
(atau union profil berlubang)
Baut dia 12 mm panjang 2 cm
Peralatan
0.050
50,000.00
0.100
60,000.00
0.005
75,000.00
Jumlah Harga Tenaga Kerja
16,667.75
15% x D
Pengoperasian per hari selama 24 jam pompa air diesel daya 5 kW dengan suction head max. 3m
discharge head max. 20m (kapasitas 0,5 m3/s pada suction head 1m dan discharge head 10m)
Pengoperasian pompa diasumsikan akan beroperasi 24 jam dan disediakan 20% pompa cadangan (misa
untuk 5 buah pompa dioperasikan dan 1 cadangan), maka biaya operasi per 1 bh pompa:
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.11
L.15
OH
OH
OH
M.162
ltr
A
1
2
3
Tenaga Kerja
Pekerja (memantau mengalirnya air)
Operator pompa
Mandor
B
1
Bahan
Solar
C
1
Peralatan
Pompa air diesel 5 KW
D
E
E.50 Hari-sewa
1.000
50,000.00
3.000
60,000.00
0.150
75,000.00
Jumlah Harga Tenaga Kerja
42.400
10,800.00
Jumlah Harga Bahan
1.2
225,000.00
Jumlah Harga Peralatan
15% x D
AHSP.Pus Air.284
F
D.05
D.06
Pengoperasian per hari selama 24 jam pompa air diesel daya 10 kW dengan suction head max. 3m
discharge head max. 20m (kapasitas 1 m3/s pada suction head 1m dan discharge head 10m)
Pengoperasian pompa diasumsikan akan beroperasi 24 jam dan disediakan 20% pompa cadangan (misa
untuk 5 buah pompa dioperasikan dan 1 cadangan), maka biaya operasi per 1 bh pompa:
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.11
L.15
OH
OH
OH
M.162
M.164
ltr
ltr
72.600
10,800.00
0.300
30,250.00
Jumlah Harga Bahan
E.51
bh
1.2
442,000.00
Jumlah Harga Peralatan
A
1
2
3
Tenaga Kerja
Pekerja (memantau mengalirnya air)
Operator pompa
Mandor
B
1
2
Bahan
Solar
Oli
C
1
Peralatan
Pompa air diesel 10 KW
D
E
F
1.000
50,000.00
3.000
60,000.00
0.150
75,000.00
Jumlah Harga Tenaga Kerja
15% x D
Pengoperasian per hari selama 24 jam pompa air diesel daya 20 kW dengan suction head max. 3m
discharge head max. 20m (kapasitas 2 m3/s pada suction head 1m dan discharge head 10m)
Pengoperasian pompa diasumsikan akan beroperasi 24 jam dan disediakan 20% pompa cadangan (misa
untuk 5 buah pompa dioperasikan dan 1 cadangan), maka biaya operasi per 1 bh pompa:
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.11
L.15
OH
OH
OH
M.162
M.164
ltr
ltr
132.800
10,800.00
0.500
30,250.00
Jumlah Harga Bahan
E.52
bh
1.2
830,000.00
Jumlah Harga Peralatan
A
1
2
3
Tenaga Kerja
Pekerja (memantau mengalirnya air)
Operator pompa
Mandor
B
1
2
Bahan
Solar
Oli
C
1
Peralatan
Pompa air diesel 20 KW
1.000
50,000.00
4.000
60,000.00
0.200
75,000.00
Jumlah Harga Tenaga Kerja
AHSP.Pus Air.285
E
F
Overhead + Profit
Harga Satuan Pekerjaan per - 1 hari (D+E)
15% x D
AHSP.Pus Air.286
Jumlah
(Rp)
7
1,000.00
375.00
1,375.00
7,500.00
1,000.00
4,900.00
13,400.00
14,775.00
2,216.25
16,991.25
2,500.00
6,000.00
375.00
8,875.00
440,250.00
8,125.00
448,375.00
457,250.00
68,587.50
525,837.50
AHSP.Pus Air.287
m pasir/tanah uk. 23 cm x 65 cm
2,500.00
6,000.00
375.00
8,875.00
340,022.10
165,000.00
505,022.10
513,897.10
77,084.57
590,981.67
50,000.00
180,000.00
11,250.00
241,250.00
457,920.00
457,920.00
270,000.00
270,000.00
969,170.00
145,375.50
AHSP.Pus Air.288
1,114,545.50
50,000.00
180,000.00
11,250.00
241,250.00
784,080.00
9,075.00
793,155.00
530,400.00
530,400.00
1,564,805.00
234,720.75
1,799,525.75
50,000.00
240,000.00
15,000.00
305,000.00
1,434,240.00
15,125.00
1,449,365.00
996,000.00
996,000.00
2,750,365.00
AHSP.Pus Air.289
412,554.75
3,162,919.75
A.6
H.01
Pintu Besi
a) 1 bh pintu uk. lebar 0,3 m dan tinggi 0,6 m, ulir tunggal
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.14
L.07
L.15
OH
OH
OH
OH
1.275
50,000.00
0.638
60,000.00
0.075
70,000.00
0.004
75,000.00
Jumlah Harga Tenaga Kerja
M.96
M.130
M.131
M.132
m
m2
kg
bh
5.400
16,667.75
0.270
105,000.00
4.000
50,000.00
1.000
125,000.00
Jumlah Harga Bahan
E.44
Hari-sewa
0.300
235,000.00
Jumlah Harga Peralatan
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang las
Kepala tukang
Mandor
B
1
2
3
4
Bahan
Baja L.40.40.4
Baja Pelat tebal 3 mm
Ulir kasar diameter 16 mm
Stang ulir diameter 16 mm
C
1
Peralatan
Mesin las listrik 250 A , diesel
D
E
F
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.14
L.07
L.15
OH
OH
OH
OH
1.700
50,000.00
0.850
60,000.00
0.100
70,000.00
0.005
75,000.00
Jumlah Harga Tenaga Kerja
M.96
M.130
M.131
M.132
m
m2
kg
bh
7.200
16,667.75
0.360
105,000.00
4.000
50,000.00
1.000
125,000.00
Jumlah Harga Bahan
E.44
Hari-sewa
0.400
235,000.00
Jumlah Harga Peralatan
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang las
Kepala tukang
Mandor
B
1
2
3
4
Bahan
Baja L.40.40.4
Baja Pelat tebal 3 mm
Ulir kasar diameter 16 mm
Stang ulir diameter 16 mm
C
1
Peralatan
Mesin las listrik 250 A , diesel
D
E
F
15% x D
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.14
L.07
L.15
OH
OH
OH
OH
2.890
50,000.00
1.445
60,000.00
0.170
70,000.00
0.009
75,000.00
Jumlah Harga Tenaga Kerja
M.96
M.130
M.131
M.132
m
m2
kg
bh
12.240
16,667.75
0.612
105,000.00
4.500
50,000.00
1.000
125,000.00
Jumlah Harga Bahan
E.44
Hari-sewa
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang las
Kepala tukang
Mandor
B
1
2
3
4
Bahan
Baja L.40.40.4
Baja Pelat tebal 3 mm
Ulir kasar diameter 16 mm
Stang ulir diameter 16 mm
C
1
Peralatan
Mesin las listrik 250 A , diesel
D
E
F
0.680
235,000.00
Jumlah Harga Peralatan
15% x D
H.02
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.14
L.07
L.15
OH
OH
OH
OH
5.780
50,000.00
2.890
60,000.00
0.340
70,000.00
0.017
75,000.00
Jumlah Harga Tenaga Kerja
M.96
M.130
M.131
M.132
m
m2
kg
bh
24.480
16,667.75
1.224
105,000.00
5.335
50,000.00
1.000
125,000.00
Jumlah Harga Bahan
E.44
Hari-sewa
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang las
Kepala tukang
Mandor
B
1
2
3
4
Bahan
Baja L.40.40.4
Baja Pelat tebal 3 mm
Ulir kasar diameter 16 mm
Stang ulir diameter 16 mm
C
1
Peralatan
Mesin las listrik 250 A , diesel
D
E
F
1.360
235,000.00
Jumlah Harga Peralatan
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.14
L.07
L.15
OH
OH
OH
OH
2.870
50,000.00
1.230
60,000.00
0.139
70,000.00
0.026
75,000.00
Jumlah Harga Tenaga Kerja
M.97
M.54
M.131
M.133
m
m3
kg
set
7.954
28,335.00
0.242
7,205,000.00
12.000
50,000.00
2.000
175,000.00
Jumlah Harga Bahan
E.44
Hari-sewa
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang las
Kepala tukang
Mandor
B
1
2
3
4
Bahan
Baja L.50.50.5
Kayu kelas II (min) ukuran 10/15
Ulir kasar diameter 16 mm
Stang ulir diameter 16 mm + gear
C
1
Peralatan
Mesin las listrik 250 A , diesel
D
E
F
0.279
235,000.00
Jumlah Harga Peralatan
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.14
L.07
L.15
OH
OH
OH
OH
5.000
50,000.00
1.500
60,000.00
0.200
70,000.00
0.005
75,000.00
Jumlah Harga Tenaga Kerja
M.97
M.54
M.131
M.132
m
m3
kg
set
15.600
28,335.00
0.144
7,205,000.00
17.500
50,000.00
2.000
125,000.00
Jumlah Harga Bahan
E.44
Hari-sewa
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang las
Kepala tukang
Mandor
B
1
2
3
4
Bahan
Baja L.50.50.5
Kayu kelas II (min) ukuran 5/12
Ulir kasar diameter 16 mm
Stang ulir diameter 16 mm + gear
C
1
Peralatan
Mesin las listrik 250 A , diesel
D
E
F
0.400
235,000.00
Jumlah Harga Peralatan
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
OH
A
1
Tenaga Kerja
Pekerja
7.000
50,000.00
2
3
4
Tukang las
Kepala tukang
Mandor
L.14
L.07
L.15
OH
OH
OH
2.200
60,000.00
0.350
70,000.00
0.070
75,000.00
Jumlah Harga Tenaga Kerja
B
1
2
3
4
Bahan
Baja L.50.50.5
Kayu kelas II (min) ukuran 8/12
Ulir kasar diameter 16 mm
Stang ulir diameter 16 mm + gear
M.97
M.54
M.131
M.132
m
m3
kg
set
19.200
28,335.00
0.384
7,205,000.00
20.000
50,000.00
2.000
125,000.00
Jumlah Harga Bahan
C
1
Peralatan
Mesin las listrik 250 A , diesel
E.44
Hari-sewa
D
E
F
0.500
235,000.00
Jumlah Harga Peralatan
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.14
L.07
L.15
OH
OH
OH
OH
7.000
50,000.00
2.500
60,000.00
0.350
70,000.00
0.070
75,000.00
Jumlah Harga Tenaga Kerja
M.97
M.54
M.131
M.132
m
m3
kg
set
19.800
28,335.00
0.432
7,205,000.00
23.748
50,000.00
2.000
125,000.00
Jumlah Harga Bahan
E.44
Hari-sewa
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang las
Kepala tukang
Mandor
B
1
2
3
4
Bahan
Baja L.50.50.5
Kayu kelas II (min) ukuran 8/12
Ulir kasar diameter 16 mm
Stang ulir diameter 16 mm + gear
C
1
Peralatan
Mesin las listrik 250 A , diesel
D
E
F
0.500
235,000.00
Jumlah Harga Peralatan
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.14
L.07
L.15
OH
OH
OH
OH
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang las
Kepala tukang
Mandor
7.000
50,000.00
3.100
60,000.00
0.350
70,000.00
0.070
75,000.00
Jumlah Harga Tenaga Kerja
B
1
2
3
4
Bahan
Baja L.50.50.5
Kayu kelas II (min) ukuran 10/15
Ulir kasar diameter 16 mm
Stang ulir diameter 16 mm + gear
C
1
Peralatan
Mesin las listrik 250 A , diesel
D
E
F
M.97
M.54
M.131
M.132
m
m3
kg
set
E.44
Hari-sewa
20.400
28,335.00
0.600
7,205,000.00
23.748
50,000.00
2.000
125,000.00
Jumlah Harga Bahan
0.720
235,000.00
Jumlah Harga Peralatan
15% x D
H.03
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.14
L.07
L.15
OH
OH
OH
OH
7.000
50,000.00
3.100
60,000.00
0.350
70,000.00
0.070
75,000.00
Jumlah Harga Tenaga Kerja
M.97
M.54
M.131
M.132
m
m3
kg
bh
21.200
28,335.00
0.660
7,205,000.00
23.748
50,000.00
2.000
125,000.00
Jumlah Harga Bahan
E.44
Hari-sewa
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang las
Kepala tukang
Mandor
B
1
2
3
4
Bahan
Baja L.50.50.5
Kayu kelas II (min) ukuran 10/15
Ulir kasar diameter 16 mm
Stang ulir diameter 16 mm + gear
C
1
Peralatan
Mesin las listrik 250 A , diesel
D
E
F
0.800
235,000.00
Jumlah Harga Peralatan
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang las
Kepala tukang
Mandor
L.01
L.14
L.07
L.15
OH
OH
OH
OH
B
1
2
Bahan
Baja L.50.50.5
Kayu kelas II (min) ukuran 10/15
M.97
M.54
m
m3
7.000
50,000.00
3.500
60,000.00
0.350
70,000.00
0.070
75,000.00
Jumlah Harga Tenaga Kerja
25.200
0.660
28,335.00
7,205,000.00
M.134
bh
C
1
2
3
Peralatan
Mesin las listrik 250 A , diesel
Stang ulir diameter 20 mm + gear
Motor 2 KW 1350 rpm + pengkabelan
D
E
F
32.750
200,000.00
Jumlah Harga Bahan
E.44 Hari-sewa
M.135
set
M.183
set
0.800
235,000.00
2.000
300,000.00
1.000
10,000,000.00
Jumlah Harga Peralatan
15% x D
2) Pintu uk. lebar 2,5 m dan tinggi 3,5 m, ulir double pakai motor
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.14
L.07
L.15
OH
OH
OH
OH
9.000
50,000.00
4.500
60,000.00
0.450
70,000.00
0.100
75,000.00
Jumlah Harga Tenaga Kerja
M.97
M.54
M.134
m
m3
bh
25.200
28,335.00
0.875
7,205,000.00
42.500
200,000.00
Jumlah Harga Bahan
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang las
Kepala tukang
Mandor
B
1
2
3
Bahan
Baja L.50.50.5
Kayu kelas II (min) ukuran 10/15
Ulir halus diameter 20 mm
C
1
2
3
Peralatan
Mesin las listrik 250 A , diesel
Stang ulir diameter 20 mm + gear
Motor 2 KW 1350 rpm + pengkabelan
D
E
F
E.44 Hari-sewa
E.21
set
M.183
set
1.200
235,000.00
2.000
400,000.00
1.000
10,000,000.00
Jumlah Harga Peralatan
15% x D
3) Pintu uk. lebar 3 m dan tinggi 3,5 m, ulir double pakai motor
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.14
L.07
L.15
OH
OH
OH
OH
10.800
50,000.00
5.400
60,000.00
0.540
70,000.00
0.120
75,000.00
Jumlah Harga Tenaga Kerja
M.97
M.54
M.134
m
m3
bh
35.200
28,335.00
1.050
7,205,000.00
42.500
200,000.00
Jumlah Harga Bahan
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang las
Kepala tukang
Mandor
B
1
2
3
Bahan
Baja L.50.50.5
Kayu kelas II (min) ukuran 10/15
Ulir halus diameter 20 mm
C
1
2
3
Peralatan
Mesin las listrik 250 A , diesel
Stang ulir diameter 20 mm + gear
Motor 2 KW 1350 rpm + pengkabelan
E.44 Hari-sewa
E.47
set
M.183
set
1.500
235,000.00
2.000
750,000.00
1.000
10,000,000.00
Jumlah Harga Peralatan
D
E
F
15% x D
4) Pintu uk. lebar 3,5 m dan tinggi 4,5 m, ulir double pakai motor
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.14
L.07
L.15
OH
OH
OH
OH
14.800
50,000.00
7.400
60,000.00
0.740
70,000.00
0.150
75,000.00
Jumlah Harga Tenaga Kerja
M.97
M.54
M.134
m
m3
bh
51.200
28,335.00
1.350
7,205,000.00
57.500
200,000.00
Jumlah Harga Bahan
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang las
Kepala tukang
Mandor
B
1
2
3
Bahan
Baja L.50.50.5
Kayu kelas II (min) ukuran 10/15
Ulir halus diameter 20 mm
C
1
2
3
Peralatan
Mesin las listrik 250 A , diesel
Stang ulir diameter 20 mm + gear
Motor 2 KW 1350 rpm + pengkabelan
D
E
F
b)
E.44 Hari-sewa
M.160
bh
M.183
bh
1.500
235,000.00
1.000
7,500.00
1.000
10,000,000.00
Jumlah Harga Peralatan
15% x D
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
B
1
Tenaga Kerja
Pengawas
bulan
2.5
3,500,000.00
Jumlah Harga Tenaga Kerja
Bahan
Bangunan bertingkat uk. 2 @3 x 5 m
(konstruksi atap beton bertulang; lantai
keramik, 4 pintu dan 4 jendela kaca mati).
m2
30.000
3,250,000.00
Peralatan
set
1.000
set
1.000
12,500,000.00
Jumlah Harga Peralatan
D
E
F
120,000,000.00
15% x D
Jumlah
(Rp)
7
63,750.00
38,280.00
5,250.00
300.00
107,580.00
90,005.85
28,350.00
200,000.00
125,000.00
443,355.85
70,500.00
70,500.00
621,435.85
93,215.38
714,651.23
Jumlah
(Rp)
7
85,000.00
51,000.00
7,000.00
375.00
143,375.00
120,007.80
37,800.00
200,000.00
125,000.00
482,807.80
94,000.00
94,000.00
720,182.80
108,027.42
828,210.22
Jumlah
(Rp)
7
144,500.00
86,700.00
11,900.00
675.00
243,775.00
204,013.26
64,260.00
225,000.00
125,000.00
618,273.26
159,800.00
159,800.00
1,021,848.26
153,277.24
1,175,125.50
Jumlah
(Rp)
7
289,000.00
173,400.00
23,800.00
1,275.00
487,475.00
408,026.52
128,520.00
266,750.00
125,000.00
928,296.52
319,600.00
319,600.00
1,735,371.52
260,305.73
1,995,677.25
Jumlah
(Rp)
143,500.00
73,800.00
9,730.00
1,950.00
228,980.00
225,376.59
1,743,610.00
600,000.00
350,000.00
2,918,986.59
65,565.00
65,565.00
3,213,531.59
482,029.74
3,695,561.33
Jumlah
(Rp)
7
250,000.00
90,000.00
14,000.00
375.00
354,375.00
442,026.00
1,037,520.00
875,000.00
250,000.00
2,604,546.00
94,000.00
94,000.00
3,052,921.00
457,938.15
3,510,859.15
Jumlah
(Rp)
7
350,000.00
132,000.00
24,500.00
5,250.00
511,750.00
544,032.00
2,766,720.00
1,000,000.00
250,000.00
4,560,752.00
117,500.00
117,500.00
5,190,002.00
778,500.30
5,968,502.30
Jumlah
(Rp)
7
350,000.00
150,000.00
24,500.00
5,250.00
529,750.00
561,033.00
3,112,560.00
1,187,400.00
250,000.00
5,110,993.00
117,500.00
117,500.00
5,758,243.00
863,736.45
6,621,979.45
Jumlah
(Rp)
7
350,000.00
186,000.00
24,500.00
5,250.00
565,750.00
578,034.00
4,323,000.00
1,187,400.00
250,000.00
6,338,434.00
169,200.00
169,200.00
7,073,384.00
1,061,007.60
8,134,391.60
Jumlah
(Rp)
7
350,000.00
186,000.00
24,500.00
5,250.00
565,750.00
600,702.00
4,755,300.00
1,187,400.00
250,000.00
6,793,402.00
188,000.00
188,000.00
7,547,152.00
1,132,072.80
8,679,224.80
Jumlah
(Rp)
7
350,000.00
210,000.00
24,500.00
5,250.00
589,750.00
714,042.00
4,755,300.00
6,550,000.00
12,019,342.00
188,000.00
600,000.00
10,000,000.00
10,788,000.00
23,397,092.00
3,509,563.80
26,906,655.80
Jumlah
(Rp)
7
450,000.00
270,000.00
31,500.00
7,500.00
759,000.00
714,042.00
6,304,375.00
8,500,000.00
15,518,417.00
282,000.00
800,000.00
10,000,000.00
11,082,000.00
27,359,417.00
4,103,912.55
31,463,329.55
Jumlah
(Rp)
7
540,000.00
324,000.00
37,800.00
9,000.00
910,800.00
997,392.00
7,565,250.00
8,500,000.00
17,062,642.00
352,500.00
1,500,000.00
10,000,000.00
11,852,500.00
29,825,942.00
4,473,891.30
34,299,833.30
Jumlah
(Rp)
7
740,000.00
444,000.00
51,800.00
11,250.00
1,247,050.00
1,450,752.00
9,726,750.00
11,500,000.00
22,677,502.00
352,500.00
7,500.00
10,000,000.00
10,360,000.00
34,284,552.00
5,142,682.80
39,427,234.80
8,750,000.00
8,750,000.00
97,500,000.00
97,500,000.00
120,000,000.00
12,500,000.00
132,500,000.00
238,750,000.00
35,812,500.00
274,562,500.00
AHSP.Pus Air.304
A.7
L.01
Pembersihan lapangan
a)
Lihat T.01 Pembersihan dan striping/korsekan (1 m2)
b)
Lihat T.02 Tebas tebang tanaman perdu (1 m2)
c)
Lihat T.03 Cabut tunggul tanaman keras (1 pohon)
L.02
Rp.
Rp.
Rp.
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.08
L.04
L.15
OH
OH
OH
OH
A
1
2
3
3
Tenaga Kerja
Pekerja
Tukang besi
Tukang tembok
Mandor
B
1
Bahan
Seng Gelombang BJLS-30 (t=0,05)
tinggi 1,8 m dan lebar 0,9m
M.103
lbr
1.200
60,200.00
2
3
4
5
Baja L 40.40.4
Kawat seng 3mm
PP
PC
M.96
M.102
M.08
M.19
m1
kg
0.035
0.300
0.100
12.000
16,667.75
25,000.00
90,000.00
1,240.00
0.16
50,000.00
0.10
60,000.00
0.10
60,000.00
0.02
75,000.00
Jumlah Harga Tenaga Kerja
m3
kg
Peralatan
D
E
F
b) Rangka Kayu
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.06
L.04
L.15
OH
OH
OH
OH
M.103
lbr
A
1
2
3
3
Tenaga Kerja
Pekerja
Tukang kayu
Tukang tembok
Mandor
B
1
Bahan
Seng Gelombang BJLS-30 (t=0,05)
tinggi 1,8 m dan lebar 0,9m
0.180
50,000.00
0.100
60,000.00
0.100
60,000.00
0.001
75,000.00
Jumlah Harga Tenaga Kerja
1.200
60,200.00
AHSP.Pus Air.305
m3
kg
kg
m3
kg
2
3
4
5
6
Peralatan
D
E
M.58
M.101
M.100
M.08
M.19
0.035
5,870,000.00
0.300
14,500.00
0.120
12,500.00
0.100
90,000.00
12.000
1,240.00
Jumlah Harga Bahan
Jumlah Harga Peralatan
F
L.03
15% x D
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.04
L.03
L.15
OH
OH
OH
OH
M.58
M.69
M.19
M.08
M.160
M.100
M.159
M.99
m3
lbr
zak
m3
lbr
kg
lbr
kg
m2
m2
daun
m2
A.
1
2
3
4
Tenaga Kerja
Pekerja
Tukang Tembok/batu
Kepala tukang batu
Mandor
B.
1
2
3
4
5
6
7
8
9
10
11
12
Bahan
Kaso 5/7
Dinding triplek 4mm
Semen
Pasir pasang
Plafon asbes 3 mm
Paku
Asbes gelombang
Paku asbes
Floor lantai 1 : 3 : 5
Pintu double teakwood rangka kayu
Jendela kaca nako
Cat dinding/plafon
Peralatan
D
E
F
M.154
1.20
50,000.00
0.40
60,000.00
0.04
70,000.00
0.05
75,000.00
Jumlah Harga Tenaga Kerja
0.05
5,870,000.00
0.60
45,000.00
0.52
62,000.00
0.10
90,000.00
1.00
7,500.00
0.75
12,500.00
0.30
50,000.00
0.1
23,100.00
0.70
35,000.00
0.1
350,000.00
1.00
25,000.00
1.00
9,362.50
Jumlah Harga Bahan
Jumlah Harga Peralatan
L.04
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
Harga
Satuan
AHSP.Pus
Air.306
(Rp)
No
Uraian
Kode
Satuan
Koefisien
A.
1
2
3
4
Tenaga Kerja
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
L.06
L.05
L.01
L.15
OH
OH
OH
OH
0.50
60,000.00
0.05
70,000.00
0.50
50,000.00
0.01
75,000.00
Jumlah Harga Tenaga Kerja
B.
1
2
3
Bahan
Multiplek tebal 12 mm
Paku campuran 5 cm dan 7cm
Cat kayu
M.72
M.100
M.154
Lbr
Kg
kg
1.00
125,000.00
0.25
12,500.00
1.00
37,450.00
Jumlah Harga Bahan
Peralatan
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.18
OH
OH
OH
A.
1
2
3
Tenaga Kerja
Akhli alat berat
Pelaksana kegiatan (Kontraktor)
Staf (Kontraktor)
B.
Bahan
Peralatan
2
400,000.00
3
400,000.00
4
400,000.00
Jumlah Harga Tenaga Kerja
b) Sewa Lahan
Lahan yang diperlukan untuk base camp dan tempat alat berat diperlukan luas 1,5 ha di daerah pedesaa
lama waktu penyewaan diperkirakan sekitar 2 tahun, maka diperhitungkan selama 26 bulan
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A.
Tenaga Kerja
AHSP.Pus Air.307
Bahan
Jumlah Harga Bahan
C
1
Peralatan
Sewa lahan
D
E
F
ha/bulan
39
2,000,000.00
Jumlah Harga Peralatan
c) Fasilitas
Berdasarkan asumsi kemudahan dalam pelaksanaan pekerjaan diperlukan luas berbagai fasilitas seperti
pada koefisien berikut ini.
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A.
Tenaga Kerja
B.
1
2
3
4
5
Bahan
Base Camp
Kantor
Barak
Bengkel
Gudang, dan lain-lain
Ruang Laboratorium (sesuai
Gambar)
m2
m2
m2
m2
m2
100
40
40
40
80
580,337.50
580,337.50
580,337.50
580,337.50
580,337.50
m2
20
580,337.50
Peralatan
Peralatan laboratorium
Perabotan & layanan
D
E
F
set
set
1.00
120,000,000.00
1.00
25,000,000.00
Jumlah Harga Peralatan
d) Kebutuhan lain-lain
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A.
Tenaga Kerja
Jumlah Harga Tenaga Kerja
B.
1
Bahan
Perkuatan jalan yang dilalui
LS
25,000,000.00
AHSP.Pus Air.308
2
3
4
Peralatan
LS
LS
LS
42,000,000.00
6,750,000.00
12,500,000.00
Jumlah Harga Bahan
Foto dokumentasi
a) 1 Set foto dokumentasi menggunakan Camera Konvensional pakai Film
Jika menggunakan Camera dengan isi film selulosa
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A.
Tenaga Kerja
Tukang foto dg kamera
B.
1
2
3
4
Bahan
Film isi 36
Cuci film
Cetak foto
Album foto
Peralatan
OH
0.01
250,000.00
Jumlah Harga Tenaga Kerja
roll
roll
lbr
bh
3
3
300
6
35,000.00
35,000.00
1,500.00
52,000.00
Jumlah Harga Bahan
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
A.
Tenaga Kerja
B.
1
2
3
Bahan
CD copy soft file foto image
Cetak Foto
Album foto
3
300
6
10,000.00
1,500.00
52,000.00
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
AHSP.Pus Air.309
D
E
F
L.07
L.08
Penggambaran
a)
Peta situasi atau peta steak out bangunan
Penggambaran dengan CAD untuk 1 bh gambar (file autocad) layout, tampak potongan dan detail untuk
b)
kondisi tidak rumit dan banyak bentuk-bentuk duplikasi ukuran A1
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.24
L.25
OH
OH
A.
1
2
Tenaga Kerja
Drafter CAD
Desain engineer
B.
Bahan
Peralatan
Sewa komputer
M.151
M.152
1.00
100,000.00
0.05
400,000.00
Jumlah Harga Tenaga Kerja
0.01
1,000,000.00
0.01
250,000.00
c)
Penggambaran secara manual untuk 1 buah gambar layout, tampak, potongan dan detail untuk kondisi t
rumit dan banyak duplikasi bentuk gambar ukuran A1
Harga Satuan
No
Uraian
Kode Satuan Koefisien
(Rp)
1
A.
1
2
Tenaga Kerja
Drafter
Desain engineer
B.
1
2
3
Bahan
Kertas HVS atau kalkir
Tinta Rapido
Pena Rapido
Peralatan
L.24
L.25
OH
OH
1.25
100,000.00
0.15
400,000.00
Jumlah Harga Tenaga Kerja
m2
bh
bh
0.3
0.05
0.002
7800
12500
125000
Jumlah Harga Bahan
AHSP.Pus Air.310
E
F
d)
15% x D
Pencetakan 1 buah gambar layout, tampak, potongan dan detail untuk kondisi tidak rumit ukuran A1
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
L.26
OH
0.08
A.
1
Tenaga Kerja
Operator printer
B.
1
2
Bahan
Kertas HVS atau kalkir
Tinta hitam
Peralatan
Sewa komputer
M.151
M.152
50,000.00
sewabulan
sewabulan
0.3
0.05
7,800.00
30,000.00
Jumlah Harga Bahan
0.001
1,000,000.00
0.01
250,000.00
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
M.170
M.175
halaman
buah
Lain-lain
A
B
C
Fotocopy kertas A4
Menjilid
Jumlah
Overhead & profit
Harga satuan pekerjaan ( D + E )
30,000.00
200.00
250.00
7,500.00
15% x D
1 set As built drawing (reduce dan copy kalkir serta blue/black print )
b)
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
Lain-lain
Copy kalkir Ac
copy kalkir reduce z1%
M.171
M.168
lembar
lembar
200
200
6,500.00
12,500.00
M.169
M.172
M.173
lembar
lembar
lembar
200
200
200
16,500.00
2,600.00
2,000.00
AHSP.Pus Air.311
A
B
C
blue/black print A3
Menjilid A1
Menjilid A2
Menjilid A3
Jumlah
Overhead & profit
Harga satuan pekerjaan ( D + E )
M.174
M.176
M.177
M.178
lembar
buah
buah
buah
200
20
20
20
15% x D
1,250.00
17,500.00
11,500.00
6,750.00
AHSP.Pus Air.312
1,270.75
2,100.48
2,455.25
Jumlah
(Rp)
7
8,000.00
6,000.00
6,000.00
1,500.00
21,500.00
72,240.00
583.37
7,500.00
9,000.00
14,880.00
104,203.37
125,703.37
18,855.51
144,558.88
Jumlah
(Rp)
7
9,000.00
6,000.00
6,000.00
75.00
21,075.00
72,240.00
AHSP.Pus Air.313
205,450.00
4,350.00
1,500.00
9,000.00
14,880.00
307,420.00
328,495.00
49,274.25
377,769.25
Jumlah
(Rp)
7
60,000.00
24,000.00
2,800.00
3,750.00
90,550.00
293,500.00
27,000.00
32,240.00
9,000.00
7,500.00
9,375.00
15,000.00
2,310.00
24,500.00
35,000.00
25,000.00
9,362.50
489,787.50
0
580,337.50
87,050.63
667,388.13
Jumlah
(Rp)
Jumlah
(Rp)
7
30,000.00
3,500.00
25,000.00
750.00
59,250.00
125,000.00
3,125.00
37,450.00
165,575.00
224,825.00
33,723.75
258,548.75
800,000.00
1,200,000.00
1,600,000.00
3,600,000.00
3,600,000.00
540,000.00
4,140,000.00
AHSP.Pus Air.314
AHSP.Pus Air.315
78,000,000.00
78,000,000.00
11,700,000.00
89,700,000.00
58,033,750.00
23,213,500.00
23,213,500.00
23,213,500.00
46,427,000.00
11,606,750.00
185,708,000.00
120,000,000.00
25,000,000.00
145,000,000.00
156,606,750.00
23,491,012.50
180,097,762.50
Jumlah
(Rp)
7
25,000,000.00
AHSP.Pus Air.316
42,000,000.00
6,750,000.00
12,500,000.00
86,250,000.00
86,250,000.00
12,937,500.00
99,187,500.00
Jumlah
(Rp)
7
2,500.00
2,500.00
105,000.00
105,000.00
450,000.00
312,000.00
972,000.00
974,500.00
97,450.00
1,071,950.00
Jumlah
(Rp)
7
30,000.00
450,000.00
312,000.00
792,000.00
AHSP.Pus Air.317
792,000.00
118,800.00
910,800.00
100,000.00
20,000.00
120,000.00
10,000.00
2,500.00
12,500.00
132,500.00
19,875.00
152,375.00
125,000.00
60,000.00
185,000.00
2340
625
250
3215
188,215.00
AHSP.Pus Air.318
28,232.25
216,447.25
4,000.00
4,000.00
2,340.00
1,500.00
3,840.00
1,000.00
2,500.00
3,500.00
11,340.00
1,701.00
13,041.00
Jumlah
(Rp)
7
7,500,000.00
1,500,000.00
3,000,000.00
450,000.00
3,450,000.00
Jumlah
(Rp)
7
1,300,000.00
2,500,000.00
3,300,000.00
520,000.00
400,000.00
AHSP.Pus Air.319
250,000.00
350,000.00
230,000.00
135,000.00
8,985,000.00
1,347,750.00
10,332,750.00
No
1
A
1
1.1
1
2
3
1.2
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
1.3
1
2
3
4
5
6
7
8
2
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
3
3.1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
3.2
1
2
3
4
5
6
7
3.3
1
2
3
4
5
6
3.4
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
3.5
1
2
3
4
5
6
4
4.1
1
2
3
4
5
6
7
8
9
4.2
1
2
3
4
5
6
7
8
9
4.3
1
2
3
4
5
6
7
8
9
4.4
1
2
3
4
5
6
7
8
9
5
1
2
3
4
5
6
6
1
a)
b)
c)
d)
2
a)
b)
c)
d)
e)
f)
3
a)
b)
7
1
2
3
4
5
6
Uraian
2
UMUM
PEKERJAAN TANAH (T.xx)
PEKERJAAN PEMBERSIHAN DAN PENGUPASAN PERMUKAAN TANAH
Pembersihan dan striping/kosrekan
Tebas tebang berupa memotong dan membersihkan lokasi dari tanaman/ tumbuhan
Cabut tunggul tanaman keras minimum diameter 15 cm dengan membuang sisa tunggul kayu dan akar-akar nya
PEKERJAAN GALIAN TANAH
Uitset trase saluran pembawa dan pembuang
Pasang profil melintang galian tanah jarak 50 m pada ruas saluran yang lurus
Pasang profil melintang galian tanah jarak 25 m pada ruas saluran tikungan
Pekerjaan Galian Tanah Biasa (Pada saluran sedalam < 1m, dibuang sejarak < 3 m, rata & rapi)
Pekerjaan Galian Tanah Biasa (Pada saluran sedalam 1 - 2 m, dibuang sejarak < 3 m, rata & rapi)
Pekerjaan Mengangkut Hasil Galian Tanah Biasa (Dibuang sejarak 3-10 m, rata & rapi)
Pekerjaan Mengangkut Hasil Galian Tanah Biasa (dibuang sejarak 10-50 m, rata & rapi)
Pekerjaan Mengangkut Hasil Galian Tanah Biasa (dibuang sejarak setiap 100 m, rata & rapi)
Pekerjaan Galian Tanah Keras (Pada saluran sedalam < 1m, dibuang sejarak < 3 m, rata & rapi)
Pekerjaan Galian Tanah Keras (Pada saluran sedalam 1 - 2 m, dibuang sejarak < 3 m, rata & rapi)
Pekerjaan Mengangkut Hasil Galian Tanah Keras (Dibuang sejarak 3-10 m, rata & rapi)
Pekerjaan Mengangkut Hasil Galian Tanah Keras (dibuang sejarak 10-50 m, rata & rapi)
Pekerjaan Mengangkut Hasil Galian Tanah Keras (dibuang sejarak setiap 100 m, rata & rapi)
Pekerjaan Galian Tanah Berbatu (Pada saluran sedalam < 1m, dibuang sejarak < 3 m, rata & rapi)
Pekerjaan Galian Tanah Berbatu (Pada saluran sedalam 1 - 2 m, dibuang sejarak < 3 m, rata & rapi)
Pekerjaan Mengangkut Hasil Galian Tanah Berbatu (Dibuang sejarak 3-10 m, rata & rapi)
Pekerjaan Mengangkut Hasil Galian Tanah Berbatu (dibuang sejarak 10-50 m, rata & rapi)
Pekerjaan Mengangkut Hasil Galian Tanah Berbatu (dibuang sejarak setiap 100 m, rata & rapi)
Pekerjaan Galian Tanah Lumpur (Pada saluran sedalam < 1m, dibuang sejarak < 3 m, rata & rapi)
Pekerjaan Galian Tanah Lumpur (Pada saluran sedalam 1 - 2 m, dibuang sejarak < 3 m, rata & rapi)
Pekerjaan Mengangkut Hasil Galian Tanah Lumpur (Dibuang sejarak 3-10 m, rata & rapi)
Pekerjaan Mengangkut Hasil Galian Tanah Lumpur (dibuang sejarak 10-50 m, rata & rapi)
Pekerjaan Mengangkut Hasil Galian Tanah Lumpur (dibuang sejarak setiap 100 m, rata & rapi)
Pekerjaan Galian Tanah Cadas (Pada saluran sedalam < 1m, dibuang sejarak < 3 m, rata & rapi)
Pekerjaan Galian Tanah Lumpur Cadas (Pada saluran sedalam 1 - 2 m, dibuang sejarak < 3 m, rata & rapi)
Pekerjaan Mengangkut Hasil Galian Tanah Cadas (Dibuang sejarak 3-10 m, rata & rapi)
Pekerjaan Mengangkut Hasil Galian Tanah Cadas(dibuang sejarak 10-50 m, rata & rapi)
Pekerjaan Mengangkut Hasil Galian Tanah Cadas (dibuang sejarak setiap 100 m, rata & rapi)
Pekerjaan Galian Pasir (Untuk fondasi bangunan sedalam < 1m, dibuang sejarak < 3 m, rata & rapi)
PEKERJAAN TIMBUNAN DAN PEMADATAN
Pekerjaan Timbunan tanah
Pekerjaan Pemadatan tanah
Pekerjaan Timbunan pasir sebagai bahan pengisi
Pekerjaan Pemadatan pasir sebagai bahan pengisi
Pekerjaan Timbunan tanah menggunakan buldozer
Pekerjaan Timbunan tanah menggunakan excavator atau Backhoe
Biaya operasioanal dump truck (mengangkut material tanah, jarak angkut 1 km)
Biaya operasional vibro roller
PEKERJAAN PASANGAN (P.xx)
Pekerjaan Pasangan batu dengan mortar jenis PC-PP (Mortar tipe M Campuran 1 PC : 2 Pasir)
Pekerjaan Pasangan batu dengan mortar jenis PC-PP (Mortar tipe S Campuran 1 PC : 3 Pasir)
Pekerjaan Pasangan batu dengan mortar jenis PC-PP (Mortar tipe N Campuran 1 PC : 4 Pasir)
Pekerjaan Pasangan batu dengan mortar jenis PC-PP (Mortar tipe O Campuran 1 PC : 5 Pasir)
Pekerjaan siaran dengan mortar jenis PC-PP (Mortar tipe M Campuran 1 PC : 2 Pasir)
Pekerjaan siaran dengan mortar jenis PC-PP (Mortar tipe S Campuran 1 PC : 3 Pasir)
Pekerjaan plesteran dengan mortar jenis PC-PP (Transram 1 cm, Mortar tipe M Campuran 1 PC : 2 Pasir)
Pekerjaan plesteran dengan mortar jenis PC-PP (Plesteran 1 cm, Mortar tipe S Campuran 1 PC : 3 Pasir)
Pekerjaan plesteran dengan mortar jenis PC-PP (Plesteran 1 cm, Mortar tipe N Campuran 1 PC : 4 Pasir)
Pekerjaan plesteran dengan mortar jenis PC-PP (Transram 1,5 cm, Mortar tipe M Campuran 1 PC : 2 Pasir)
Pekerjaan plesteran dengan mortar jenis PC-PP (Plesteran 1,5 cm, Mortar tipe S Campuran 1 PC : 3 Pasir)
Pekerjaan plesteran dengan mortar jenis PC-PP (Plesteran 1,5 cm, Mortar tipe N Campuran 1 PC : 4 Pasir)
Pekerjaan Pasangan Batu Kosong
Bronjong kawat uk. B=1,0 m x L=3,0 m x T=0,5 m berisi batu kali/belah sesuai dengan Pd T-04-2004-A, Pembuatan
Bendung Bronjong dengan Sekat Semi Kedap Air pada Irigasi Desa. Kawat bronjong anyaman heksagonal, diagonal
lubang 15 cm, jenis kawat digalvanis, anyaman tiga lilitan.
1) Menggunakan kawat f 3mm
2) Menggunakan kawat f 4mm
Bronjong kawat uk. B=1,0 m x L=3,0 m x T=0,5 m berisi batu kali/belah, Kawat bronjong anyaman heksagonal,
diagonal lubang 15 cm, jenis kawat digalvanis, anyaman tiga lilitan serta menggunakan rangka besi beton diameter
10 - 12 mm.
1) Menggunakan kawat f 3mm
2) Menggunakan kawat f 4mm
Bronjong kawat uk. B=1,0 m x L=3,0 m x T=0,5 m berisi batu kali/belah, Kawat bronjong anyaman heksagonal,
diagonal lubang 15 cm, jenis kawat digalvanis di las satu sama lain dibuat di pabrik serta menggunakan
pengikat/penyambung dengan kawat bronjong diameter 4 mm.
1) Menggunakan kawat f 6mm
2) Menggunakan kawat f 8mm
3) Menggunakan kawat f 10mm
Fondasi cerucuk untuk beronjong, HSP 1 m panjang cerucuk kayu/bambu diameter 8 cm 10 cm
Pekerjaan Pemasangan modul 1 m3 bronjong kawat menjadi struktur krib
Pekerjaan Pasangan batu muka
Pekerjaan Pasangan batu candi
Pekerjaan Pemasangan Geotekstil
Pekerjaan Pasangan Bar Screen/saringan kasar (besi beton dia 12mm jarak 3,5cm)
Pekerjaan Pasangan bangunan pengukur dan pengatur (Rechbox / Cipoleti / V-note) Dengan besi siku L.40.40.4
Pekerjaan Buis beton diangkut < 30 m dan dipasang untuk konstruksi pengaman pantai
Pekerjaan Pengecoran buis beton diameter 1 m' dengan camputran beton f'c= 7,4MPa(K-100)
PEKERJAAN BETON (B.xx)
PEKERJAAN PEMBUATAN BETON
Pekerjaan 1 m3 beton untuk lantai kerja (bedding)
Pekerjaan 1 m3 beton mutu, fc = 7,4 MPa (K100), slump (122) cm, w/c = 0,87 (Manual)
Pekerjaan 1 m3 beton mutu, fc = 7,4 MPa (K100), slump (122) cm, w/c = 0,87 (Molen)
Pekerjaan 1 m3 beton mutu, fc = 9,8 MPa (K125), slump (122) cm, w/c = 0,78 (Manual)
Pekerjaan 1 m3 beton mutu, fc = 9,8 MPa (K125), slump (122) cm, w/c = 0,78 (Molen)
Pekerjaan 1 m3 beton mutu, fc = 12,2 MPa (K150), slump (122) cm, w/c = 0,72 (Manual)
Pekerjaan 1 m3 beton mutu, fc = 12,2 MPa (K150), slump (122) cm, w/c = 0,72 (Molen)
Pekerjaan 1 m3 beton mutu, fc = 14,5 MPa (K175), slump (122) cm, w/c = 0,66 (Manual)
Pekerjaan 1 m3 beton mutu, fc = 14,5 MPa (K175), slump (122) cm, w/c = 0,66 (Molen)
Pekerjaan 1 m3 beton mutu, fc = 14,5 MPa (K175), slump (122) cm, w/c = 0,66 (R+P)
Pekerjaan 1 m3 beton mutu, fc = 16,9 MPa (K200), slump (122) cm, w/c = 0,61 (Manual)
Pekerjaan 1 m3 beton mutu, fc = 16,9 MPa (K200), slump (122) cm, w/c = 0,61 (Molen)
Pekerjaan 1 m3 beton mutu, fc = 16,9 MPa (K200), slump (122) cm, w/c = 0,61 (R+P)
Pekerjaan 1 m3 beton mutu, fc = 19,3 MPa (K225), slump (122) cm, w/c = 0,58 (Manual)
Pekerjaan 1 m3 beton mutu, fc = 19,3 MPa (K225), slump (122) cm, w/c = 0,58 (Molen)
Pekerjaan 1 m3 beton mutu, fc = 19,3 MPa (K225), slump (122) cm, w/c = 0,58 (R+P)
Pekerjaan 1 m3 beton mutu, fc = 21,7 MPa (K250), slump (122) cm, w/c = 0,56 (Manual)
Pekerjaan 1 m3 beton mutu, fc = 21,7 MPa (K250), slump (122) cm, w/c = 0,56 (Molen)
Pekerjaan 1 m3 beton mutu, fc = 21,7 MPa (K250), slump (122) cm, w/c = 0,56 (R+P)
Pekerjaan 1 m3 beton mutu, fc = 24,0 MPa (K275), slump (122) cm, w/c = 0,53 (Manual)
Pekerjaan 1 m3 beton mutu, fc = 24,0 MPa (K275), slump (122) cm, w/c = 0,53 (Molen)
Pekerjaan 1 m3 beton mutu, fc = 24,0 MPa (K275), slump (122) cm, w/c = 0,53 (R+P)
Pekerjaan 1 m3 beton mutu, fc = 26,4 MPa (K300), slump (122) cm, w/c = 0,52 (Manual)
Pekerjaan 1 m3 beton mutu, fc = 26,4 MPa (K300), slump (122) cm, w/c = 0,52 (Molen)
Pekerjaan 1 m3 beton mutu, fc = 26,4 MPa (K300), slump (122) cm, w/c = 0,52 (R+P)
Pekerjaan 1 m3 beton mutu, fc = 28,8 MPa, (K325), slump (122) cm, w/c = 0,49 (Manual)
Pekerjaan 1 m3 beton mutu, fc = 28,8 MPa, (K325), slump (122) cm, w/c = 0,49 (Molen)
Pekerjaan 1 m3 beton mutu, fc = 28,8 MPa, (K325), slump (122) cm, w/c = 0,49 (R+P)
Pekerjaan 1 m3 beton mutu, fc = 31,2 MPa, (K350), slump (122) cm, w/c = 0,48 (Manual)
Pekerjaan 1 m3 beton mutu, fc = 31,2 MPa, (K350), slump (122) cm, w/c = 0,48 (Molen)
Pekerjaan 1 m3 beton mutu, fc = 31,2 MPa, (K350), slump (122) cm, w/c = 0,48 (R+P)
Penambahan koefisien tenaga kerja dan peralatan untuk mengangkut/menaikan campuran beton setiap
kenaikan vertikal 4 m dan jarak horizontal setiap 25 m ke tapak pemasangan
Pekerjaan 1 m3 beton dicorkan pada tapak berjarak < 25 m dengan ketinggian/kedalaman < 1 m (Manual)
Pekerjaan 1 m3 beton dicorkan pada tapak berjarak < 25 m dengan ketinggian/kedalaman < 1 m (Molen)
Pekerjaan 1 m3 beton dicorkan pada tapak berjarak < 25 m dengan ketinggian/kedalaman < 1 m (Tenaga manual + Vibrator)
Pekerjaan 1 m3 beton dicorkan pada tapak berjarak setiap tambahan jarak 25 m (horizontal), menggunakan tenaga
manual, maka upah kerja angkut dan cor
Pekerjaan 1 m3 beton dicorkan pada tapak berjarak setiap tambahan jarak 25 m (horizontal), menggunakan
peralatan pompa beton
Pekerjaan 1 m3 beton dicorkan pada tapak setiap kenaikan 3 m - 4 m (vertikal), menggunakan tenaga manual, maka
upah kerja angkut dan cor
Pekerjaan 1 m3 beton dicorkan pada tapak setiap kenaikan 3 m - 4 m (vertikal), menggunakan peralatan pompa
PEKERJAAN PEMBESIAN BETON
Pekerjaan Pembesian 100 kg dengan besi polos atau ulir
Pekerjaan Pembesian 100 kg jaring kawat (wire mesh)
Pekerjaan Penambahan koefisien tenaga kerja dan peralatan untuk mengangkut/menaikkan 100 kg tulangan setiap
kenaikan vertikal 4m atau jarak horizontal setiap 25 m ke tapak pemasangan secara manual (kenaikan 4m)
Pekerjaan Penambahan koefisien tenaga kerja dan peralatan untuk mengangkut/menaikkan 100 kg tulangan setiap
kenaikan vertikal 4m atau jarak horizontal setiap 25 m ke tapak pemasangan secara mekanis (penambahan jarak
horizontal 10m s.d 25m)
Pekerjaan Penambahan koefisien tenaga kerja dan peralatan untuk mengangkut/menaikkan 100 kg tulangan setiap
kenaikan vertikal 4m atau jarak horizontal setiap 25 m ke tapak pemasangan secara mekanis (penambahan jarak
Pekerjaan Pembesian 100 kg kabel prestressed polos/strand
PEKERJAAN PEMBUATAN/PENYEDIAAN BEKISTING BETON
Pekerjaan 1 m2 Bekisting untuk permukaan beton biasa dengan multiflex 12 mm atau 18 mm (tanpa perancah)
Pekerjaan 1 m2 Bekisting untuk permukaan beton biasa dengan papan ukuran 3/20 cm (tanpa perancah)
Pekerjaan 1 m2 bekisting untuk permukaan beton expose dengan multiflex 12 mm atau 18 mm - kaso 5/7 cm (tanpa
Pekerjaan 1 m2 perancah bekisting kaso 5/7 cm tinggi 4 m*
Pekerjaan 1 m2 perancah bekisting kayu dolken diameter 8 cm 10 cm tinggi 4 m **
Pekerjaan Bekisting balok beton biasa dengan multiflex 12 mm atau 18 mm (tanpa perancah)
Pekerjaan Perancah Bekisting balok dengan Kaso 5/7 tinggi 4 m
Pekerjaan Perancah Bekisting balok dengan Kayu dolken diameter 8 cm tinggi 4 m
Pekerjaan Bekisting kolom beton biasa dengan multiflex 12 mm atau 18 mm
Pekerjaan Bekisting kolom beton biasa dengan papan ukuran 3/20 cm
Pekerjaan Bekisting dinding beton biasa dengan multiflex 12 mm atau 18 mm
Pekerjaan Bekisting dinding beton biasa dengan papan ukuran 3/20 cm
Pekerjaan Bekisting fondasi dan sloof beton biasa dengan multiflex 12 mm/18 mm
Pekerjaan Bekisting fondasi dan sloof beton biasa dengan papan ukuran 3/20 cm
Pekerjaan Bongkar 1 m2 bekisting secara biasa
Pekerjaan Bongkar 1 m2 bekisting secara hati-hati
Pekerjaan Menggenangi air 100 m2 permukaan beton
Pekerjaan Menyirami air 100 m2 permukaan beton (Memasang 100 m2 terpal/karung goni basah)
Pekerjaan Menyirami air 100 m2 permukaan beton (Menyirami m2 Terpal/Karung Goni dengan air selama 4 hari)
Pemancangan tiang pancang beton bertulang ukuran 30 x 30 cm untuk sampai dengan per-satuan 2,5 ton daya
dukung tiang pancang beban normal dan untuk maksimum 1 m jarak antar tiang dalam satu group tiang pancang
Pemancangan tiang pancang beton bertulang ukuran 40 x 40 cm untuk sampai dengan per-satuan 2,5 ton daya
dukung tiang pancang beban normal dan untuk maksimum 1 m jarak antar tiang dalam satu group tiang pancang
Pemancangan turap kayu dolken diameter 10-12 cm untuk sampai dengan per-satuan 1 ton daya dukung per-tiang
beban normal
Pemancangan turap baja profil Larsen lebar 350 mm untuk sampai dengan per-satuan 1 ton daya dukung per-tiang
beban normal
Ppemancangan turap beton bertulang pre-cast lebar 30 cm dan tebal 12 cm untuk sampai dengan per-satuan 1 ton
daya dukung tiang pancang beban normal
Pemancangan turap beton bertulang pre-cast lebar 40 cm dan tebal 15 cm untuk sampai dengan per-1 ton daya
dukung tiang pancang beban normal
Analisis koefisien satuan pekerjaan pemancangan dengan kompresor udara
Pemancangan tiang pancang kayu gelondongan diameter 20 cm untuk sampai dengan per-satuan 2,5 ton daya
dukung tiang pancang beban normal dan untuk maksimum 1 m jarak antar tiang dalam satu group tiang pancang
Pemancangan tiang pancang baja pipa diameter 30 cm atau ukuran 30 x 30 cm untuk sampai dengan per-satuan 2,5
ton daya dukung tiang pancang beban normal dan untuk maksimum 1 m jarak antar tiang dalam satu group tiang
Pemancangan tiang pancang baja kotak diameter 30 cm atau ukuran 30 x 30 cm untuk sampai dengan per-satuan
2,5 ton daya dukung tiang pancang beban normal dan untuk maksimum 1 m jarak antar tiang dalam satu group
Pemancangan tiang pancang beton bertulang ukuran 30 x 30 cm untuk sampai dengan per-satuan 2,5 ton daya
dukung tiang pancang beban normal dan untuk maksimum 1 m jarak antar tiang dalam satu group tiang pancang
Pemancangan tiang pancang beton bertulang ukuran 40 x 40 cm untuk sampai dengan per-satuan 2,5 ton daya
dukung tiang pancang beban normal dan untuk maksimum 1 m jarak antar tiang dalam satu group tiang pancang
Pemancangan turap kayu dolken diameter 10-12 cm untuk sampai dengan per-satuan 1 ton daya dukung per-tiang
beban normal
Pemancangan turap baja profil Larsen lebar 350 mm untuk sampai dengan per-satuan 1 ton daya dukung per-tiang
beban normal
Ppemancangan turap beton bertulang pre-cast lebar 30 cm dan tebal 12 cm untuk sampai dengan per-satuan 1 ton
daya dukung tiang pancang beban normal
Pemancangan turap beton bertulang pre-cast lebar 40 cm dan tebal 15 cm untuk sampai dengan per-1 ton daya
dukung tiang pancang beban normal
PEKERJAAN DEWATERING (D.xx)
Kistdam pasir/tanah dibungkus karung plastik bagor (sebesar karung beras 25 kg) uk. 43 cm x 65 cm
Kerangka kayu untuk 1 m3 kistdam pasir/tanah uk. 23 cm x 65 cm
Kerangka baja profil L.40.40.4 atau profil union berlubang untuk 1 m3 kistdam pasir/tanah uk. 23 cm x 65 cm
Pengoperasian per hari selama 24 jam pompa air diesel daya 5 kW dengan suction head max. 3m dan discharge
head max. 20m (kapasitas 0,5 m3/s pada suction head 1m dan discharge head 10m)
Pengoperasian per hari selama 24 jam pompa air diesel daya 10 kW dengan suction head max. 3m dan discharge
head max. 20m (kapasitas 1 m3/s pada suction head 1m dan discharge head 10m)
Pengoperasian per hari selama 24 jam pompa air diesel daya 20 kW dengan suction head max. 3m dan discharge
head max. 20m (kapasitas 2 m3/s pada suction head 1m dan discharge head 10m)
PEKERJAAN PINTU AIR DAN HIDROMEKANIK (H.xx)
Pintu besi
Pintu uk. lebar 0,3 m dan tinggi 0,6 m, ulir tunggal
Pintu uk. lebar 0,4 m dan tinggi 0,6 m, ulir tunggal
Pintu uk. lebar 0,5 m dan tinggi 0,8 m, ulir tunggal
Pintu uk. lebar 0,8 m dan tinggi 1 m, ulir tunggal
Pintu Kayu Rangka Besi
Pintu uk. lebar 1,2 m dan tinggi 1,4 m, ulir double
Pintu uk. lebar 1 m dan tinggi 2 m, ulir double
Pintu uk. lebar 1,4 m dan tinggi 2,5 m, ulir double
Pintu uk. lebar 1,6 m dan tinggi 2,5 m, ulir double
Pintu uk. lebar 1,8 m dan tinggi 2,5 m, ulir double
Satuan
3
Harga Satuan
Upah Kerja
(Rp)
6
Harga Satuan
Bahan
(Rp)
7
Harga Satuan
Alat
(Rp)
8
1,270.75
2,100.48
2,455.25
705.00
1,115.00
1,915.00
71.50
-
400.00
640.00
220.00
T.04
T.05
T.06
T.07 a)
T.07 b)
T.07 c)
T.07 d)
T.07 e)
T.08 a)
T.08 b)
T.08 c)
T.08 d)
T.08 e)
T.09 a)
T.09 b)
T.09 c)
T.09 d)
T.09 e)
T.10 a)
T.10 b)
T.10 c)
T.10 d)
T.10 e)
T.11 a)
T.11 b)
T.11 c)
T.11 d)
T.11 e)
T.12
1,322.50
71,642.13
143,054.25
40,485.75
48,558.75
14,950.00
43,470.00
77,050.00
69,569.25
61,065.00
19,837.50
33,982.50
77,050.00
81,563.75
81,563.75
19,837.50
33,982.50
77,050.00
64,635.75
84,042.00
19,837.50
33,982.50
77,050.00
97,031.25
100,791.75
19,837.50
33,982.50
77,050.00
43,556.25
650.00
9,375.00
18,750.00
35,205.00
42,225.00
13,000.00
37,800.00
67,000.00
46,995.00
51,750.00
17,250.00
29,550.00
67,000.00
70,925.00
70,925.00
17,250.00
29,550.00
67,000.00
56,205.00
73,080.00
17,250.00
29,550.00
67,000.00
84,375.00
87,645.00
17,250.00
29,550.00
67,000.00
37,875.00
52,722.50
105,445.00
-
500.00
200.00
200.00
13,500.00
1,350.00
-
/ 1m3
/ 1m3
/ 1m3
/ 1m3
/ 1m3
/ 1m3
/ 1m3
/ 1m3
T.14 a)
T.14 b)
T.14 c)
T.14 d)
T.15
T.16
T.17
T.18
20,872.50
33,925.00
150,650.00
8,337.50
634,225.00
577,875.00
787,658.00
634,225.00
17,400.00
28,750.00
23,000.00
5,750.00
167,500.00
172,500.00
120,000.00
167,500.00
108,000.00
216,000.00
162,000.00
25,920.00
216,000.00
750.00
750.00
1,500.00
168,000.00
168,000.00
539,000.00
168,000.00
/ 1m3
P.01 a)
849,223.25
205,575.00
466,080.00
66,800.00
/ 1m2
/ 1m2
/ 1phn
T.01
T.02
T.03
/ 1m
/ 1m
/ 1m
/ 1m3
/ 1m3
/ 1m3
/ 1m3
/ 1m3
/ 1m3
/ 1m3
/ 1m3
/ 1m3
/ 1m3
/ 1m3
/ 1m3
/ 1m3
/ 1m3
/ 1m3
/ 1m3
/ 1m3
/ 1m3
/ 1m3
/ 1m3
/ 1m3
/ 1m3
/ 1m3
/ 1m3
/ 1m3
/ 1m3
/ 1m3
/ 1m3
/ 1m3
/ 1m3
/ 1m3
/ 1m3
/ 1m3
/ 1m3
/ 1m3
/ 1m3
/ 1m3
/ 1m3
P.01 b)
P.01 c)
P.01 d)
P.02 a)
P.02 b)
P.03 a)
P.03 b)
P.03 c)
P.03 d)
P.03 e)
P.03 f)
P.04
782,580.75
730,589.25
693,145.25
40,384.09
38,866.09
41,874.49
40,085.09
38,309.95
55,007.67
52,551.83
49,797.53
267,582.00
205,575.00
205,575.00
205,575.00
26,175.00
26,175.00
26,175.00
26,175.00
26,175.00
33,355.00
33,355.00
33,355.00
79,800.00
408,130.00
362,920.00
330,360.00
8,941.60
7,621.60
10,237.60
8,681.60
7,138.00
14,477.76
12,342.24
9,947.20
152,880.00
66,800.00
66,800.00
66,800.00
#REF!
#REF!
#REF!
#REF!
#REF!
-
/ 1m3
/ 1m3
P.05 a) 1)
P.05 a) 2)
387,403.38
507,762.95
68,875.00
80,075.00
267,997.50
361,458.00
/ 1m3
/ 1m3
P.05 b) 1)
P.05 b) 2)
595,687.35
714,430.49
65,825.00
70,825.00
452,164.00
550,418.90
/ bh
/ bh
/ bh
/1m
/ 1m3
/ 1m2
/ 1m2
/ 1m2
/ bh
/ bh
/ bh
/ 1m3
P.05 c) 1)
P.05 c) 2)
P.05 c) 3)
P.05 c)
P.05 d)
P.06
P.07
P.08
P.09
P.10
P.11
P.12
495,313.05
667,612.95
829,322.50
10,682.06
29,382.50
177,387.50
227,527.50
124,056.25
372,296.40
150,731.65
12,362.50
750,767.29
16,950.00
20,190.00
24,950.00
2,525.00
6,750.00
20,800.00
20,800.00
2,875.00
60,825.00
26,450.00
10,750.00
75,400.00
413,757.00
560,343.00
696,200.00
6,475.00
11,500.00
133,450.00
177,050.00
105,000.00
227,261.00
91,671.00
497,441.13
35,650.00
12,950.00
80,000.00
/ 1m3
/ 1m3
/ 1m3
/ 1m3
/ 1m3
/ 1m3
/ 1m3
/ 1m3
/ 1m3
/ 1m3
/ 1m3
/ 1m3
/ 1m3
/ 1m3
/ 1m3
/ 1m3
/ 1m3
/ 1m3
/ 1m3
B.01
B.02 a)
B.02 b)
B.03 a)
B.03 b)
B.04 a)
B.04 b)
B.05 a)
B.05 b)
B.05 c)
B.06 a)
B.06 b)
B.06 c)
B.07 a)
B.07 b)
B.07 c)
B.08 a)
B.08 b)
B.08 c)
671,992.29
695,320.04
763,992.29
733,509.41
802,181.66
763,568.71
832,240.96
799,016.82
867,689.07
916,883.50
832,996.34
901,668.59
939,883.50
858,203.49
926,875.74
962,883.50
875,097.41
943,769.66
980,133.50
86,900.00
107,185.00
86,900.00
107,185.00
86,900.00
107,185.00
86,900.00
107,185.00
86,900.00
63,290.00
107,185.00
86,900.00
63,290.00
107,185.00
86,900.00
63,290.00
107,185.00
86,900.00
63,290.00
497,441.13
497,441.13
497,441.13
530,649.27
530,649.27
556,787.79
556,787.79
587,612.24
587,612.24
710,000.00
617,159.64
617,159.64
730,000.00
639,078.90
639,078.90
750,000.00
653,769.27
653,769.27
765,000.00
80,000.00
80,000.00
80,000.00
80,000.00
24,000.00
80,000.00
24,000.00
80,000.00
24,000.00
80,000.00
24,000.00
288.75
7,300.00
/ 1m3
/ 1m3
/ 1m3
/ 1m3
/ 1m3
/ 1m3
/ 1m3
/ 1m3
/ 1m3
/ 1m3
/ 1m3
/ 1m3
B.09 a)
B.09 b)
B.09 c)
B.10 a)
B.10 b)
B.10 c)
B.11 a)
B.11 b)
B.11 c)
B.12 a)
B.12 b)
B.12 c)
903,999.04
972,671.29
991,633.50
954,439.75
1,023,112.00
1,020,383.50
980,572.86
1,038,941.11
1,059,374.25
992,346.30
413,292.55
1,078,349.25
107,185.00
86,900.00
63,290.00
107,185.00
86,900.00
63,290.00
136,325.00
107,080.00
79,695.00
136,325.00
107,080.00
79,695.00
/ 1m3
/ 1m3
/ 1m3
B.13 a)
B.13 b)
B.13 c)
25,300.00
29,871.25
46,402.50
22,000.00
12,500.00
26,875.00
/ 1m3
B.14 a)
30,906.25
26,875.00
/ 1m3
B.14 b)
39,962.50
10,750.00
24,000.00
/ 1m3
B.15 a)
/ 1m3
B.15 b)
15,237.50
39,962.50
13,250.00
10,750.00
24,000.00
/ 1m2
/ 1m2
B.17
B.18
1,331,010.00
2,945,897.50
84,900.00
29,650.00
/ 1m2
B.19 a)
25,875.00
22,500.00
/ 1m2
B.19 b)
42,866.25
13,900.00
23,375.00
23,375.00
23,375.00
/ 1m2
B.19 c)
/ 1m2
B.20
52,756.25
4,661,525.00
22,500.00
60,750.00
/ 1m2
/ 1m2
/ 1m2
/ 1m2
/ 1m2
/ 1m2
/ 1m2
/ 1m2
/ 1m2
/ 1m2
/ 1m2
/ 1m2
/ 1m2
/ 1m2
/ 1m2
/ 1m2
/ 1m2
/ 1m2
/ 1m2
B.21
B.22
B.23
B.24
B.25
B.26
B.27
B.28
B.29
B.30
B.31
B.32
B.33
B.34
B.35
B.36
B.37
B.38 a)
B.38 b)
244,863.75
532,237.25
264,126.25
803,361.25
860,171.25
2,052,803.19
1,011,741.25
860,171.25
1,054,923.75
1,480,124.75
1,054,923.75
1,289,753.75
1,054,923.75
1,289,247.75
37,087.50
37,087.50
49,450.00
49,450.00
49,450.00
44,250.00
57,585.00
53,450.00
53,600.00
53,600.00
44,250.00
53,600.00
53,600.00
44,250.00
57,585.00
44,250.00
57,585.00
44,250.00
57,585.00
32,250.00
32,250.00
43,000.00
43,000.00
43,000.00
678,901.13
678,901.13
775,000.00
722,762.61
722,762.61
800,000.00
716,347.05
716,347.05
817,500.00
726,584.83
172,304.83
834,000.00
1,072,500.00
2,532,000.00
168,675.00
405,230.00
176,225.00
644,975.00
694,375.00
1,740,796.25
826,175.00
694,375.00
873,075.00
1,229,480.00
873,075.00
1,063,940.00
873,075.00
1,063,500.00
-
80,000.00
24,000.00
80,000.00
24,000.00
80,000.00
24,000.00
80,000.00
24,000.00
13,475.00
13,475.00
-
/ 1m2
/ 1m2
/ 1m
/ 1m
/ 1m
/ 1m
B.39
B.40
B.41
B.42
B.43
B.44
305,037.50
124,602.50
96,180.25
115,092.00
145,624.50
159,016.25
103,750.00
32,250.00
4,735.00
5,430.00
5,730.00
6,725.00
30,000.00
78,900.00
94,650.00
120,900.00
131,550.00
131,500.00
76,100.00
-
/m'
F.01
501,676.00
3,400.00
367,500.00
65,340.00
/m'
F.02
633,089.38
6,625.00
508,712.50
35,175.00
/m'
F.03
720,201.88
6,625.00
584,462.50
35,175.00
/m'
F.04
384,583.00
6,500.00
236,900.00
91,020.00
/m'
F.05
620,971.25
9,125.00
412,000.00
118,850.00
/m'
F.06
131,301.25
4,750.00
40,250.00
69,175.00
/m'
F.07
232,869.25
8,600.00
147,000.00
46,895.00
/m'
F.08
395,283.75
9,125.00
206,000.00
128,600.00
/m'
F.09
536,969.50
11,750.00
309,000.00
146,180.00
/m'
F.10
501,676.00
3,400.00
367,500.00
65,340.00
/m'
F.11
633,089.38
6,625.00
508,712.50
35,175.00
/m'
F.12
638,983.13
6,625.00
508,712.50
40,300.00
/m'
F.13
402,896.75
6,500.00
236,900.00
106,945.00
/m'
F.14
754,221.75
9,125.00
519,120.00
127,600.00
/m'
F.15
251,476.25
4,750.00
120,750.00
93,175.00
/m'
F.16
241,120.50
8,600.00
147,000.00
54,070.00
/m'
F.17
407,071.25
9,125.00
206,000.00
138,850.00
/m'
F.18
566,380.75
11,750.00
309,000.00
171,755.00
/m'
F.19
520,375.00
3,400.00
367,500.00
81,600.00
/m'
F.20
633,089.38
6,625.00
508,712.50
35,175.00
/m'
F.21
720,201.88
6,625.00
584,462.50
35,175.00
/m'
F.22
465,715.50
6,500.00
298,700.00
99,770.00
/m'
F.23
742,434.25
9,125.00
519,120.00
117,350.00
/m'
F.24
80,988.75
4,750.00
40,250.00
25,425.00
/m'
F.25
221,277.25
8,600.00
147,000.00
36,815.00
/m'
F.26
378,723.75
9,125.00
206,000.00
114,200.00
/m'
F.27
373,301.50
11,750.00
185,400.00
127,460.00
/m'
F.28
510,991.00
3,400.00
367,500.00
73,440.00
/m'
F.29
647,838.13
6,625.00
508,712.50
48,000.00
/m'
F.30
726,095.63
6,625.00
584,462.50
40,300.00
/m'
F.31
455,653.00
6,500.00
298,700.00
91,020.00
/m'
F.32
744,159.25
9,125.00
519,120.00
118,850.00
/m'
F.33
185,207.50
4,750.00
120,750.00
35,550.00
/m'
F.34
221,277.25
8,600.00
147,000.00
36,815.00
/m'
F.35
260,273.75
9,125.00
103,000.00
114,200.00
/m'
F.36
394,829.50
11,750.00
185,400.00
146,180.00
/1bh
/m3
/m3
/hari
D.01
D.02
D.03
D.04
16,991.25
525,837.50
590,981.67
1,114,545.50
1,375.00
8,875.00
8,875.00
241,250.00
13,400.00
448,375.00
505,022.10
457,920.00
270,000.00
/hari
D.05
1,799,525.75
241,250.00
793,155.00
530,400.00
/hari
D.06
3,162,919.75
305,000.00
1,449,365.00
996,000.00
/unit
/unit
/unit
/unit
H.01 a)
H.01 b)
H.01 c)
H.01 d)
714,651.23
828,210.22
1,175,125.50
1,995,677.25
107,580.00
143,375.00
243,775.00
487,475.00
443,355.85
482,807.80
618,273.26
928,296.52
714,651.23
828,210.22
159,800.00
319,600.00
/unit
/unit
/unit
/unit
/unit
H.02 a)
H.02 b)
H.02 c)
H.02 d)
H.02 e)
3,695,561.33
3,510,859.15
5,968,502.30
6,621,979.45
8,134,391.60
228,980.00
354,375.00
511,750.00
529,750.00
565,750.00
2,918,986.59
2,604,546.00
4,560,752.00
5,110,993.00
6,338,434.00
65,565.00
94,000.00
117,500.00
117,500.00
169,200.00
/unit
H.02 f)
8,679,224.80
565,750.00
6,793,402.00
188,000.00
/unit
/unit
/unit
/unit
H.03a)1)
H.03a)2)
H.03a)3)
H.03a)4)
26,906,655.80
31,463,329.55
34,299,833.30
39,427,234.80
589,750.00
759,000.00
910,800.00
1,247,050.00
12,019,342.00
15,518,417.00
17,062,642.00
22,677,502.00
10,788,000.00
11,082,000.00
11,852,500.00
10,360,000.00
/unit
H.03 b)
274,562,500.00
8,750,000.00
97,500,000.00
132,500,000.00
/m2
/m2
/m2
/m2
/paket
/paket
/paket
/paket
/paket
/paket
lbr
lbr
lbr
jilid
set
L.02 a)
L.02 b)
L.03
L.04
L.05 a)
L.05 b)
L.05 c)
L.05 d)
L.06 a)
L.06 b)
L.08 a)
L.08 b)
L.08 c)
L.09 a)
L.09 b)
144,558.88
377,769.25
667,388.13
258,548.75
4,140,000.00
89,700,000.00
180,097,762.50
99,187,500.00
1,071,950.00
910,800.00
152,375.00
216,447.25
13,041.00
3,450,000.00
10,332,750.00
21,500.00
21,075.00
90,550.00
59,250.00
3,600,000.00
2,500.00
120,000.00
185,000.00
4,000.00
104,203.37
307,420.00
489,787.50
165,575.00
185,708,000.00
86,250,000.00
972,000.00
792,000.00
3,215.00
3,840.00
78,000,000.00
145,000,000.00
12,500.00
3,500.00
Ket
9