Anda di halaman 1dari 113

275,000,000.

00
Dua Ratus Tujuh Puluh Lima Juta Rupiah.-

Se
Dua
Tiga
Empat
Lima
Enam
Tujuh
Delapan
Sembilan
275,000,000
275,000,000
275,000,000
275,000,000
275,000,000
275,000,000
275,000,000
275,000,000
275,000,000
275,000,000
75,000,000
5,000,000
0
0
0
0
0
0

Satu
Dua
Tiga
Empat
Lima
Enam
Tujuh

Juta

Delapan
Sembilan
0
0
0
0
0
0
0
0
0
2
7
5
0
0
0
0
0
0

Dua Ratus
Tujuh Puluh Lima Juta
Lima

DAFTAR HARGA SATUAN UPAH DAN BAHAN


TAHUN 2010
NO
1
I

URAIAN

SATUAN

HARGA SATUAN
( Rp )
4

UPAH TENAGA KERJA


1
2

Pekerja
Mandor

OH
OH

45,000.00
65,000.00

3 Tukang Batu
4 Tukang Kayu
5 Tukang Besi

OH
OH
OH

65,000.00
65,000.00
65,000.00

6 Tukang Cat
7 Kepala Tukang

OH
OH

65,000.00
65,000.00

8 Tukang
BAHAN
Bahan Batu, Semen, Tanah dan Pasir

OH

45,000.00

1
2

Batu Belah/Gunung
Batu Bata

M2
Bh

100,000.00
500.00

3
4
5

Batu Pecah 5/7


Batu Pecah 3/5
Batu Pecah 1/3

M3
M3
M3

100,000.00
250,000.00
150,000.00

6
7

Batu Kali
Split

M3
M3

100,000.00
250,000.00

8
9

Kerikil
Kerikil Halus

M3
M3

115,000.00
75,000.00

10
11
12

Pasir Pasangan
Pasir Urug
Semen Tonasa @ 50 Kg

M3
M3
Kg

85,000.00
85,000.00
1,400.00

13
14

Semen Tiga Roda @ 50 Kg


Semen Bosowa @ 50 Kg

Kg
Kg

1,300.00
1,300.00

15 Semen Warna
16 Domato Timbunan Pilihan
17 Tanah Urug

Kg
M3
M3

38,000.00
10,000.00
20,000.00

350,000.00

II
A.

18
B.

Buis Beton

Bahan Kayu
1 Kayu Lingua Balok Klas I
2 Kayu Lingua Papan Klas I

M3
M3

3,300,000.00
3,300,000.00

3
4

Kayu Papan Klas II


Kayu Balok Klas II

M3
M3

2,600,000.00
2,600,000.00

5
6
7

Kayu Balok Kls III


Kayu Papan Kls III
Kayu Lis Profil 3 cm

M3
M3
Btg

1,750,000.00
1,750,000.00
10,500.00

8
9

Kayu Lis Profil 4 cm

Btg

12,000.00
19,500.00

Lumbersering (7 mm)
10 Triplek Tebal 3 mm
11 Triplek Tebal 4 mm
C.

Lembar
Lembar
Lembar

45,000.00
65,000.00

Bahan Logam
1 Angker Kozen

Kg

10,000.00

2
3

Baut Pengunci Kuda-kuda dia. 12 mm


Beugel Pengikat Kuda-kuda dia. 12 mm

Bh
Bh

8,500.00
25,000.00

4
5
6

Besi Beton Dia 6"


Besi Beton Dia 8"
Besi Beton Dia 10"

Ujung
Ujung
Ujung

15,000.00
41,000.00
63,000.00

7
8

Besi Beton Dia 12"


Besi Beton Dia 16"

Ujung
Ujung

91,000.00
135,000.00

9
10
11

Besi Beton Polos


Kawat Beton
Kawat Bronjong

Kg
Kg
Kg

9,000.00
20,000.00
25,000.00

12
13

Kawat Las
Kawat Harmonika

Kg
Kg

33,500.00
30,000.00

14
15

Kawat Ram
Paku Biasa 2 - 6 "

M2
Kg

2,400.00
14,000.00

1
16

Paku Seng

3
Kg

17
18
19

Paku Atap Genteng Metal


Paku Triplek
Seng Gelombang BJLS 20 Kl

Kg
Kg
Lbr

25,000.00
23,000.00
50,000.00

20
21
22
23

Seng Gelombang BJLS 30 Kl


Seng Plat BJLS 20 Kl
Seng Plat BJLS 30 Kl
Genteng Metal (Sakura Roof)

Lbr
Lbr
Lbr
Lbr

50,000.00
51,000.00
55,000.00
40,000.00

24
25
26

Nok Genteng Metal (Sakura Roof)


Bumbungan
Besi Penyangga

Lbr
Lbr
M'

35,000.00
25,000.00
100,000.00

D.

4
28,000.00

Perlengkapan Pintu dan Jendela


1
2
3

Engsel Kupu-kupu Kecil


Engsel Kupu-kupu Besar
Engsel Kuningan

Bh
Bh
Bh

10,000.00
15,000.00
25,000.00

4
5

Grendel Jendela
Hak Angin Biasa

Bh
Bh

15,000.00
3,500.00

6
7
8

Kaca Bening Tbl 3 mm


Kaca Bening Tbl 4,5 mm
Kunci Tanam 2 Slaag ( Yale )

M2
M2
Bh

100,000.00
120,000.00
55,000.00

Daun Pintu PVC / Toilet

Set

Batu Karawang 12 x 24 cm
Glass Block

Bh
Bh

780,000.00
5,000.00

9
10
11
E.

F.

40,000.00

Bahan Lantai
1
2

Keramik Lantai 30 x 30 cm
Keramik Lantai 20 x 20 cm

bh
bh

6,000.00
2,680.00

3
4

Keramik Dinding 20 x 25 cm
Plint Warna 30 x 30 cm

Dos
Dos

65,000.00
60,000.00

Bahan Cat
1 Amplas

Lbr

5,000.00

2
3

Cat Dasar
Cat Tembok ( Metrolite )

Kg
Kg

5,000.00
16,000.00

4
5
6
7

Dempul Kayu
Meni Kayu
Plamer / Dempul Tembok ( Setara Wallputty )
Residu (5 L)

Kg
Kg
Kg
Kaleng

20,000.00
20,000.00
7,600.00
36,000.00

G.
1
2

Bahan Instalasi Listrik


Biaya Penyambungan ( BP ) Watt 900
Biaya Penyambungan ( BP ) Watt 1300

Ls
Ls

450,000.00
950,000.00

3
4

Biaya Penyambungan ( BP ) Watt 2200


Instalasi Listrik ( Titik lampu )

Ls
Ttk

1,700,000.00
135,000.00

5
6
7

Stop Kontak
Lampu Pijar 15 Watt
Lampu TL 20 Watt

bh
bh
bh

10,000.00
35,000.00
27,000.00

8
9

Saklar Tunggal
Saklar Ganda

bh
bh

10,000.00
15,000.00

11
12
13

Rumah Saklar
MCB
Pipa Lampu

bh
bh
bh

2,500.00
60,000.00
10,000.00

H.

Perlengkapan Sanitair
1
2
3
4
5

1
1
1
1
1

6
7

M'
M'
M'
M'
M'

Pipa
Pipa
Pipa
Pipa
Pipa

GIP Diameter
GIP Diameter
GIP Diameter
GIP Diameter
GIP Diameter

1/2 "
3/4 "
1"
1 1/4 "
1 1/2"

Ujung
Ujung
Ujung
Ujung
Ujung

94,000.00
105,000.00
150,000.00
170,000.00
190,000.00

1 M' Pipa GIP Diameter 2 "


1 M' Pipa PVC Diameter 1/2 "

Ujung
Ujung

260,000.00
20,000.00

8
9
10

1 M' Pipa PVC Diameter 3/4 "


1 M' Pipa PVC Diameter 1 "
1 M' Pipa PVC Diameter 1,5 "

Ujung
Ujung
Ujung

35,000.00
40,000.00
60,000.00

11
12

1 M' Pipa PVC Diameter 2 "


1 M' Pipa PVC Diameter 3 "

Ujung
Ujung

45,000.00
84,000.00

13

1 M' Pipa PVC Diameter 4 "

Ujung

60,000.00

1
14

Pipa PVC SNI Diameter 3 "

3
M'

Pipa PVC SNI Diameter 2 "


Pipa PVC SNI Diameter 1,5 "
Pipa PVC SNI Diameter 1 "

M'
M'
M'

115,000.00
110,000.00
270,000.00

18 Pipa PVC SNI Diameter 3/4 "


18 Asesoris Ukuran 1/2"
19 Asesoris Ukuran 3/4"
20 Asesoris Ukuran 1"

M'
Bh
Bh
Bh

654,000.00
5,000.00
6,000.00
7,500.00

21 Asesoris Ukuran 1 1/4"


22 Asesoris Ukuran 1 1/2"
23 Asesoris Ukuran 2"

Bh
Bh
Bh

10,000.00
10,000.00
13,500.00

24 Asesoris Ukuran 2 1/2"


25 Asesoris Ukuran 3"

Bh
Bh

15,000.00
15,000.00

26 Asesoris Ukuran 4"


27 Bak Cuci Piring Stainless Steel
28 Floor Drain Stainless Steel

Bh
Bh
Bh

26,000.00
350,000.00
40,000.00

29
30

Floor Drain Stainless Steel


Ijuk Saringan

Bh
Kg

35,000.00
15,000.00

31
32
33

Kloset Duduk
Kloset Jongkok ( KIA )
Kloset Jongkok ( Toto )

Set
Bh
Bh

1,500,000.00
170,000.00
180,000.00

34
35

Kloset Jongkok ( INA )


Kran Air

Bh
Bh

170,000.00
25,000.00

36
37
38

Stop Kran 1/2


Stop Kran 3/4
Selang Air

Bh
Bh
M'

60,000.00
60,000.00
15,000.00

39
40

Seal Tape
Pipa Penguras / Bocoran Bak Stainless Steel

Bh
Bh

4,000.00
75,000.00

41
42
43

Wastafel ( KIA )
Pompa Air Jet Pump 300 watt
Mesin Genset 950 Watt

15
16
17

I.

Bh
Unit
Unit

4
114,000.00

390,000.00
3,700,000.00
1,800,000.00

ALAT
1
2

Cangkul
Sekop

Bh
Bh

50,000.00
50,000.00

3 Linggis
4 Ember
5 Tali
6 Timba
7 Kuas

Bh
Bh
Bh
Bh
Bh

35,000.00
15,000.00
4,000.00
7,000.00
15,000.00

Bh

37,500.00

Katrol

TAR HARGA SATUAN UPAH DAN BAHAN


TAHUN 2010
KET.
5

70,000.00
65,000.00

REKAPITULASI RENCANA ANGGARAN BIAYA

NO
1
I

URAIAN
2
SARANA AIR MINUM (SAM)
1. Pek. Jaringan Pipa 2.700 M ( Dusun 2 dan 3)
a). Bahan
b). Alat
c). Upah
Sub Total 1
2. Pek. Sumur Bor Dalam
a). Bahan
c). Upah
Sub Total 2
3. Pek Menara (1 Unit)
a). Bahan
b). Alat
c). Upah
Sub Total 3
4. Pek Rumah Pompa ( 1 Unit)
a). Bahan
b). Upah
Sub Total 4
6. Pek. Hidran Umum (9 Unit)
a). Bahan
b). Upah
Sub Total 5
5. Pek Sumur Gali ( 3Unit)
a). Bahan
b). Alat
c). Upah
Sub Total 5

BIAYA (Rp)
KONTRIBUSI MASYARAKAT
IN CASH
IN KIND
4
5

TOTAL
3=4+5+6+7

Rp
Rp
Rp
Rp
Rp

52,664,943
500,000
18,291,810
71,456,753
71,456,750

Rp
Rp
Rp
Rp

16,827,000
10,000,000
26,827,000
26,827,000

Rp
Rp
Rp
Rp
Rp

19,494,172
150,000
5,527,752
25,171,924
25,171,900

Rp
Rp
Rp
Rp

135,303
68,925
204,229
204,200

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

2,727,900
525,350
3,253,250

Rp
Rp
Rp
Rp

4,182,281
500,000
10,243,639
14,925,919

Rp

3,217,000
150,000
351,077
3,718,077

Rp
Rp
Rp
Rp

402,653
402,653

Rp
Rp

Rp
Rp

68,925
68,925

52,938,887
30,481,500
83,420,386
83,420,400

Rp
Rp
Rp

Rp
Rp
Rp

7,101,004
21,006,573
28,107,577

22,073,351
684,000
7,810,156
30,567,507
30,567,500

Rp
Rp
Rp
Rp

4,028,719
4,028,719

Rp
Rp
Rp
Rp

495,000
495,000

Rp
Rp

Rp
Rp
Rp
Rp

Total Sarana Air Minum (1 + 2 + 3 + 4 + 5 + 6)


Total Sarana Air Minum (1 + 2 + 3 + 4 + 5 + 6) Pembulatan

Rp
Rp

237,647,799
237,647,750

Rp
Rp

11,000,045
11,000,000

Rp
Rp

44,000,075
44,000,000

II

SARANA SANITASI (SS)


1. Washtafel Sekolah (2 Unit)
a). Bahan
b). Alat
c). Upah
Sub Total 1
2. WC Sekolah (1 Unit)
a). Bahan
b). Alat
c). Upah
Sub Total 2

III

IV

Total Sarana Sanitasi (1 + 2)


PELATIHAN
a) Pelatihan Satlak dan Lembaga Keswadayaan Masyarakat (LKM)
b) Pelatihan Badan Pengelola Sarana (BPS)
Total Pelatihan
PROMOSI KESEHATAN
a) PHBS
Total Promosi Kesehatan
BIAYA OPERASIONAL LKM
Total BOP
Grand Total (I + II + III + IV + V)
Sisa Dana
Total Dana Bantuan
Terbilang

Rp
Rp
Rp
Rp
Rp

1,149,349
956,651
2,106,000
2,106,000

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp
Rp

8,315,092
150,000
3,928,991
12,394,082
12,394,082
14,500,000

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp

Rp

Rp
Rp
Rp
Rp

4,500,000
4,500,000
9,000,000
9,000,000

Rp

Rp

Rp

11,000,000
11,000,000

Rp
Rp
Rp

44,000,000
44,000,000

Rp
Rp
Rp
Rp
Rp
Rp
Rp

5,352,283
5,352,283 Rp
5,352,300
8,500,000
8,500,000 Rp
275,000,033 Rp
275,000,000 Rp
Rp0

Rp275,000,000
Dua Ratus Tujuh Puluh Lima Juta Rupiah.-

ULASI RENCANA ANGGARAN BIAYA

BIAYA (Rp)
APBN

APBD

BOBOT (%)
8

Rp
Rp
Rp
Rp

45,754,762
7,522,821
53,277,584

Rp

Rp
Rp

19.15%
0.18%
6.65%
25.98%

Rp
Rp
Rp

16,827,000
10,000,000
26,827,000

Rp
Rp
Rp

6.12%
3.64%
9.76%

Rp
Rp
Rp
Rp

15,874,519
5,176,676
21,051,195

Rp
Rp
Rp
Rp

7.09%
0.05%
2.01%
9.15%

Rp

135,303

Rp

135,303

Rp
Rp
Rp

0.05%
0.03%
0.07%

Rp
Rp
Rp

45,837,882
9,474,927
55,312,809

Rp
Rp
Rp

19.25%
11.08%
30.33%

Rp
Rp
Rp
Rp

18,044,632
189,000
7,810,156
26,043,788

Rp
Rp
Rp
Rp

8.03%
0.25%
2.84%
11.12%

Rp
Rp

182,647,679
182,647,700

Rp
Rp

86.42%
86.42%

Rp
Rp
Rp
Rp
pembulatan

Rp
Rp
Rp
Rp
Rp

1,149,349
956,651
2,106,000
2,106,000

0.42%
0.00%
0.35%
0.77%

Rp
Rp
Rp
Rp
Pembulatan
Rp

Rp
8,315,092
Rp
150,000
Rp
3,928,991
Rp 12,394,082
Rp 12,394,082
Rp 14,500,000

3.02%
0.05%
1.43%
4.51%

Rp

4,500,000

Rp
Rp

4,500,000
4,500,000

1.64%
1.64%
3.27%

Rp
Rp

4,500,000
4,500,000

Rp
Rp
Rp

5,352,283
5,352,300
5,352,300

Rp
Rp

192,500,000
192,500,000
0

Rp275,000,000
Dua Ratus Tujuh Puluh Lima Juta Rupiah.-

Rp

Rp
8,500,000
Rp 8,500,000
Rp 27,500,000
Rp 27,500,000

5.27%

1.95%
1.95%
3.09%
3.09%
100.00%
0.00%
100.00%

PROGRAM PAMSIMAS
(PENYEDIAAN AIR MINUM & SANITASI BERBASIS MASYARAKAT)
ANALISA & RAB SUMUR BOR
Provinsi/ Kabupaten/ Kecamatan/ Desa : Gorontalo/ Boalemo/ Wonosari / Harapan
Sub.Pek./Kegiatan : Sumur Bor Dangkal ( Kedalaman 25 Meter )
Dimensi
: 12 Titik

NO RAB : 1
Pekerjaan/ Kegiatan : Sarana Air Minum

NO

I
1
2
3
4
II

Volume
Konstribusi Masyarakat

URAIAN

Total

1
BAHAN
Pompa Air ( Jet Pump 300 watt )
Penambahan Daya Listrik (Mesin Genset 950 watt)
Pipa Chasing PVC SNI dia 3" + Perlengkapan
Pipa Pengisapan 1" PVC SNI+ Perlengkapan

UPAH PENGEBORAN SUMUR


1 Pekerja/Tukang Bor Sumur

inCash

2=3+4+5+6

inKind
4

APBN

APBD

Satuan

Biaya (Rp)
Kontribusi

Harga Satuan
(Rp)

Total

1.00
1.00
25.00
30.00

1.00
1.00
25.00
30.00

unit
ls
m
m

Rp
Rp
Rp
Rp

3,700,000
1,800,000
114,000
270,000
Sub Total I

1.00

1.00

HOK

Rp

2,000,000
Sub Total II
Jumlah Total
12

Total

inCash

9=2x8
Rp
Rp
Rp
Rp
Rp

APBN

Inkind

10=3x8

11=4x8

APBD

12=5x8

13=6x8

3,700,000
1,800,000
2,850,000
8,100,000
16,450,000

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

3,700,000
1,800,000
2,850,000
8,100,000
16,450,000

Rp
Rp
Rp
Rp
Rp

Rp
2,000,000
Rp
2,000,000
Rp 18,450,000
Rp 221,400,000

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp
2,000,000
Rp
2,000,000
Rp 18,450,000
Rp 221,400,000

Rp
Rp
Rp
Rp

Boalemo,
Disetujui Oleh :

Juni 2010

Dibuat Oleh :

Ketua DPMU

Koordinator LKM

DESA HARAPAN

Pekerjaan
Jumlah Unit Bangunan
No.

:
:

HIDRAN UMUM
12
Unit

Sket

Perhitungan

Vol

Perhitungan Volume dan Material


I

Pek.Persiapan
1 Pengukuran Bouplank dan Profil
Panjang Pengukuran Bouplank dan Profil
P
1.3

1.3

7.2

m2

7.20
1.3

2.3

2.3

2.3
II

Pek.Tanah
1 Galian Tanah

Volume Galian tanah


2.3

1.20

Lbr

Pjg

Tggi

2.3

1.3

0.4

1.196

0.4
1.3
2 Urugan pasir Bawah Pondasi

Volume Urugan Pasir Bawah Pondasi


V

0.1
2.3

0.30

Lbr

Pjg

Tggi

1.3

2.3

0.1

0.299

m3

(a+b)

Tggi

0.6

0.8

1.3
3 Pek. Pondasi Batu Kali
0.3

Volume Pas. Pondasi Batu Kali


L pondasi

0.3

0.9

2.59
V

2
0.8

0.36

p
7.2

0.36

2.592

m3

0.26

=
=

0.26
0.442

1.7

m3

=
=
=

0.075
0.075
0.1275

2
0.6

0.8
0.8

2
=

0.45

0.36

m2

4 Pek. Urugan Tanah Dibawah Lantai


Volume Urugan Tanah Dibawah Lantai
0.7

L Urugan

(a+b)

Tggi

2
0.1

0.7

0.65

2
x

0.65

0.65
=
0.1

0.44

=
=

0.8
2
0.4
0.26

x
m2

0.65

4 Pek. Urugan Tanah Dibawah Lantai


0.7

Volume Urugan Tanah Dibawah Lantai


L Urugan

0.15
=

1
2
0.5

0.13

(a+b)

Tggi

0.5

0.15

x
x

Tggi
0.1

x
x

p
1.7

m3

2
=
0.5

III

=
=

Pek. Beton
1 Pek. Lantai Beton Tumbuk 1:2:3

1
2
0.5
0.075

0.15

x
m2

0.15

Lbr
1.3
0.299

x
x
m3

Pjg
2.3

Volume Pek. Lantai Beton

2.3

=
=
=

0.30

0.1
1.3
2 Pek Sloof & Ring Balk

Volume Pek. Sloof & Ring Balk


V

0.15

7.2

0.16

=
=
=

Lbr
0.15
0.162

x
x
m3

Pjg
7.2

x
x

Tggi
0.15

=
=
=

Lbr
1.3
0.299

x
x
m3

Pjg
2.3

x
x

Tggi
0.1

0.15
3 Pek. Plat Atap

Volume Plat Atap


2.3

V1

0.26
V tot

=
=
=

V1
0.299
0.263

V2
0.036

0.1
1.3

4 Pek. Tutup Manhole

Volume Manhole

0.6

V2

0.1

0.04
=

Lbr

Pjg

Tggi

0.6

0.6

0.1

0.036

0.6

PERHITUNGAN VOLUME HIDRAN UMUM

Halaman 18 dari 113

DESA HARAPAN

Pekerjaan
Jumlah Unit Bangunan
No.

:
:

HIDRAN UMUM
12
Unit

Sket

Perhitungan

5 Pek. Kolom 15/15

Vol

Volume Kolom

0.15

0.09

=
=
=

Lbr
0.15
0.0225

x
x
m3

Pjg
0.15

x
x

Vtot

=
=
=

V
0.0225
0.09

x
x
m3

Jumlah
4

Kolom

Tggi
1

0.15

IV

Pek. Bak Hidran


1

Volume Pek. Bak Hidran

6.00

Pek. Pas. Bata Bak Hydran SP 1 : 4

=
=
=

Lbr
2
2

x
x
m2

Tggi
1

L1

=
=
=

Lbr
2
4

x
x
m2

Jumlah
2

=
=
=

Lbr
1
1

x
x
m2

Tggi
1

L2

=
=
=

Lbr
1
2

x
x
m2

Jumlah
2

m2

sisi

1
sisi

1
Ltot

2 Plesteran & Acian


a Dinding Bak Dalam Dan Luar

Luas Plesteran Campuran 1 : 4


L1
1.3

14.00

Vtot Pas. Bata

=
=

6
12

x
m2

=
=
=

Panjang
2
x
2
m2

x
1

Jumlah

Dalam & Luar

2
1.3

1
b

Lantai

L2
1

Luas Total Plesteran Campuran 1 : 4


=
L1
+
=
12
+
=
14
m2

Pek. SPAL
a Saluran Pembuangan
1 Galian Tanah

Tggi

L2
2

Volume Galian tanah

=
=
=

1.08
Lbr
0.45
1.08

x
x
m3

Pjg
8

x
x

Tggi
0.3

0.3
0.45
2 Pas. Bata

Volume Pas. Bata

7.60

=
=
=

Lbr
8
3.2

x
x
m2

Tggi
0.4

L1

=
=
=

Lbr
3.2
6.4

x
x
m2

Jumlah
2

0.4

L2

=
=
=

Lbr
8
1.2

x
x
m2

Tggi
0.15

Ltot

=
=
=

L1
6.4
7.6

+
+
m2

L2
1.2

8
2

0.15

Kiri & Kanan

8
3 Pek. Plesteran

Volume Pek. Plesteran

0.15

L1

=
=
=

Lbr
8
3.6

x
x
m2

Tggi
0.15

x
x

Jumlah
3
Kiri,Kanan,Bawah

0.25

L2

=
=
=

Lbr
8
4

x
x
m2

Tggi
0.25

x
x

Jumlah
2

Sisi

=
=
=

Lbr
8
6.4

x
x
m2

Tggi
0.4

x
x

Jumlah
2

Sisi

=
=
=

L1
3.6
14

+
+
m2

L2
4

+
+

L3
6.4

8
2
8
3

14.00

0.4

L3

8
Ltot

PERHITUNGAN VOLUME HIDRAN UMUM

Halaman 19 dari 113

DESA HARAPAN

Pekerjaan
Jumlah Unit Bangunan
No.

:
:

HIDRAN UMUM
12
Unit

Sket

Perhitungan

b Lubang Pembuangan
1 Galian Tanah

Vol

Volume Galian tanah

1.50

=
=
=

Lbr
1
1.5

x
x
m3

Pjg
1

x
x

Tggi
1.5

1.5

1
2

Pek. Pas. Bata

Volume Pas. Bata

L1
1.5

5.10
=

Lbr

Tggi

Jumlah

0.7

1.5

2.1

Lbr

Tggi

Jumlah

1.5

m2

=
=
=

L1
2.1
5.1

+
+
m2

sisi

0.7
L2

2
1.5
1

Ltot

Pek. Plat Penutup Lubang

sisi

L2
3

Volume Plat Penutup Lubang

0.1

0.10

Lbr

Pjg

Tggi

0.1

0.1

m3

1
4 Pek. Plesteran

Volume Plesteran

L1

=
=
=

Lbr
0.7
4.2

x
x
m2

Tggi
1.5

L2

=
=
=

Lbr
1
1

x
x
m2

Tggi
1

Ltot

=
=
=

L1
4.2
5.2

+
+
m2

L2
1

=
=

Lebar
2.3
9.2

x
x
m2

=
=
=

Lebar
1.3
5.2

=
=

Lebar
2.3

2.99

1.5

0.7
2
1

VI

Pengecatan
1 Dinding Bak Luar Depan&Belakang

5.20

Luas Pengecatan
L1
=
2

x
x

Jumlah
4
sisi

Tggi
2

x
x

Jumlah
2

sisi

x
x
m2

Tggi
2

x
x

Jumlah
2

sisi

x
x

Pnjng
1.3

L2
5.2

+
+

L3
2.99

17.39

2.3
L2
2 Dinding Bak Kiri dan Kanan
2
L3
1.3

m2

3 Pelat Tutup Bak


Luas Total Pengecatan
=
=
=

1.3

L1
9.2
17.39

+
+
m2

2.3
VII

Pekerjaan Lain-Lain
Pekerjaan Lain-Lain
1/ Pembuatan dan Pemasangan Ventilasi
Udara Pipa PVC Dia. 2 Inch Sesuai Gambar
Pipa PVC Dia. 2 Inch
Tee PVC Dia. 2 Inch
Double Neple PVC Dia. 2 Inch
Knee PVC Dia. 2 Inch
2/ Pek. Mata Kran
Kran Air
3/ Pek. Stop Kran 2 " (Penyedot)
Stop Kran

PERHITUNGAN VOLUME HIDRAN UMUM

1.00
0.50
1.00
2.00
2.00
4.00

1.00

Halaman 20 dari 113

DESA HARAPAN

Sat

Keterangan

m1

m3

m3

m3

m3

m3

m3

m3

m3

m3

PERHITUNGAN VOLUME HIDRAN UMUM

Halaman 21 dari 113

DESA HARAPAN

Sat

Keterangan

m3

m2

m2

m3

m2

m2

PERHITUNGAN VOLUME HIDRAN UMUM

Halaman 22 dari 113

DESA HARAPAN

Sat

Keterangan

m3

m2

m3

m2

m2

ls
M1
Bh
Bh
Bh
Bh

Bh

PERHITUNGAN VOLUME HIDRAN UMUM

Halaman 23 dari 113

PROGRAM PAMSIMAS
(PENYEDIAAN AIR MINUM & SANITASI BERBASIS MASYARAKAT)
ANALISA & RAB HYDRAN UMUM
Provinsi/ Kabupaten/ Kecamatan/ Desa : Gorontalo/ Boalemo/ Wonosari / Harapan
NO RAB : 2
Pekerjaan/ Kegiatan

NO

Sub Pekerjaan
Dimensi

: Sarana Air Minum

URAIAN
1
PEK. PEMASANGAN BOUWPLANK
Kayu 5/7 Klas III
Paku Biasa 2" - 5"
Kayu Papan 3/20 Klas III
Tukang Kayu
Pekerja

Volume

Satuan

3
0.012
0.020
0.007
0.100
0.100

7.20
0.086
0.144
0.050
0.720
0.720

4
m1
m3
kg
m3
HOK
HOK

Rp
Rp
Rp
Rp
Rp

1,750,000
14,000
1,750,000
65,000
45,000

0.900

1.20
1.076

m3
HOK

Rp

45,000

1.200
0.300

0.30
0.359
0.090

m3
m3
HOK

Rp
Rp

85,000
45,000

1.200
163.000
0.520
0.750
1.500

2.59
3.110
422.496
1.348
1.944
0.135

m3
m3
Kg
m3
HOK
HOK

Rp
Rp
Rp
Rp
Rp

100,000
1,400
85,000
65,000
45,000

0.500

0.44
0.221

m3
HOK

Rp

45,000

1.200
0.250

0.13
0.153
0.032

m3
m3
HOK

Rp
Rp

85,000
45,000

0.270
2.000
105.000
2.250
225.000
0.520
0.780
0.350
0.120
0.120
1.200

0.30
0.081
0.598
31.395
0.673
67.275
0.155
0.233
0.105
0.036
0.036
0.359

m3
m3
kg
kg
kg
Kg
m3
m3
HOK
HOK
HOK
HOK

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,750,000
14,000
9,000
20,000
1,400
85,000
115,000
65,000
65,000
65,000
45,000

0.270
2.000
105.000
3.000
225.000
0.540
0.810
0.275
1.560
1.400
5.650

0.16
0.044
0.324
17.010
0.486
36.450
0.087
0.131
0.045
0.253
0.227
0.915

m3
m3
kg
kg
kg
Kg
m3
m3
HOK
HOK
HOK
HOK

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

65,000
1,750,000
14,000
9,000
20,000
1,400
85,000
115,000
65,000
65,000
65,000
45,000

0.320
2.000
105.000
2.240
225.000
0.540
0.810
0.150
0.275
1.560
1.400
5.650

0.09
0.029
0.180
9.450
0.202
20.250
0.049
0.073
0.014
0.025
0.140
0.126
0.509

m3
m3
kg
kg
kg
kg
m3
m3
m3
HOK
HOK
HOK
HOK

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,750,000
14,000
9,000
20,000
1,400
85,000
115,000
1,750,000
65,000
65,000
65,000
45,000

0.270
2.000
105.000
3.000
225.000
0.540
0.810
0.275
1.560
1.400
5.650

0.16
0.044
0.324
17.010
0.486
36.450
0.087
0.131
0.045
0.253
0.227
0.915

m3
m3
kg
kg
kg
kg
m3
m3
m3
HOK
HOK
HOK

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,750,000
14,000
9,000
20,000
1,400
85,000
115,000
65,000
65,000
65,000
45,000

Total
Sub Total I
II

PEK.TANAH/PONDASI
1 Galian Tanah Pondasi
Pekerja

Total

2 Urugan Pasir Bawah Pondasi


Pasir Urug
Pekerja
Total
3 Pas.Pondasi Batu Kali 1:4
Batu Kali/Belah 15 cm/20 cm
Semen PC
Pasir Pasang
Tukang Batu
Pekerja
4 Urugan Tanah Di Bawah lantai
Pekerja
5 Urugan Pasir Dibawah lantai
Pasir Urug
Pekerja

Total

Total

Total

Harga Satuan
(Rp)

Koef.

Sub Total II
III

PEK. BETON
1 Pek. Lantai Beton Tumbuk 1:2:3
Kayu Kls. III
Paku Biasa
Besi Beton Polos
Kawat Beton Polos
Semen PC
Pasir Beton
Kerikil beton
Tukang Batu
Tukang Kayu
Tukang Besi
Pekerja
2 Pek. Sloof
Kayu Kls. III papan
Paku Biasa
Besi Beton Polos
Kawat Beton Polos
Semen PC
Pasir Beton
Kerikil beton
Tukang Batu
Tukang Kayu
Tukang Besi
Pekerja
3 Pek. Kolom
Kayu Kls. III papan
Paku Biasa
Besi Beton Polos
Kawat Beton Polos
Semen PC
Pasir Beton
Kerikil beton
Kayu Kls. III Balok
Tukang Batu
Tukang Kayu
Tukang Besi
Pekerja
4 Pek. Ring Balk
Kayu Kls. III papan
Paku Biasa
Besi Beton Polos
Kawat Beton Polos
Semen PC
Pasir Beton
Kerikil beton
Tukang Batu
Tukang Kayu
Tukang Besi
Pekerja

Total

Total

Total

Total

5 Pek. Plat Penutup


Kayu Kls. III
Paku Biasa
Besi Beton Polos
Kawat Beton Polos
Semen PC
Pasir Beton
Kerikil beton
Tukang Batu
Tukang Kayu
Tukang Besi
Pekerja
6 Pek. Manhole
Kayu Kls. III
Paku Biasa
Besi Beton Polos
Kawat Beton Polos
Semen PC
Pasir Beton
Kerikil beton
Tukang Batu
Tukang Kayu
Tukang Besi
Pekerja

Total

Total

0.270
2.000
105.000
2.250
225.000
0.520
0.780
0.350
0.120
0.120
1.200

0.26
0.071
0.526
27.615
0.592
59.175
0.137
0.205
0.092
0.032
0.032
1.098

m3
m3
kg
kg
kg
kg
m3
m3
HOK
HOK
HOK
HOK

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,750,000
14,000
9,000
20,000
1,400
85,000
115,000
65,000
65,000
65,000
45,000

0.270
2.000
105.000
2.250
225.000
0.520
0.780
0.350
0.120
0.120
1.200

0.04
0.010
0.072
3.780
0.081
8.100
0.019
0.028
0.013
0.004
0.004
0.043

m3
m3
kg
kg
kg
kg
m3
m3
m3
HOK
HOK
HOK

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,750,000
14,000
9,000
20,000
1,400
85,000
115,000
65,000
65,000
65,000
45,000

70.000
11.500
0.043
0.100
0.300

6.00
433.015
69.000
0.258
0.600
1.800

m2
bh
kg
m3
HOK
HOK

Rp
Rp
Rp
Rp
Rp

500
1,400
85,000
65,000
45,000

6.240
0.024
0.150
0.300

14.00
87.360
0.336
2.100
4.200

m2
kg
m3
HOK
HOK

Rp
Rp
Rp
Rp

1,400
85,000
65,000
45,000

3.250
0.100
0.200

14.00
45.500
1.400
2.800

m2
kg
HOK
HOK

Rp
Rp
Rp

1,400
65,000
45,000

1.000
0.025
0.100
0.010

4.00
4.000
0.100
0.400
0.040

bh
bh
bh
HOK
HOK

Rp
Rp
Rp
Rp

25,000
4,000
65,000
45,000

1.000
0.350
0.060
0.360

1.00
1.000
0.350
0.060
0.360

ls
bh
bh
HOK
HOK

Rp
Rp
Rp
Rp

60,000
4,000
65,000
45,000

1.200
1.000
0.240
0.060
0.360

1.00
1.200
1.000
0.240
0.060
0.360

ls
m1
m2
bh
HOK
HOK

Rp
Rp
Rp
Rp
Rp

9
15,000
7,500
65,000
45,000

0.750

1.08
0.810

HOK

Rp

45,000

70.000
0.043
11.500
0.300
0.100

7.60
532.000
0.327
87.400
2.280
0.760

m2
bh
m3
kg
HOK
HOK

Rp
Rp
Rp
Rp
Rp

500
85,000
1,400
45,000
65,000

0.024
6.240
0.300
0.150

14.00
0.336
87.360
4.200
2.100

m2
m3
kg
HOK
HOK

Rp
Rp
Rp
Rp

85,000
1,400
45,000
65,000

0.900

1.50
1.350

m3
HOK

Rp

45,000

70.000
0.043
11.500
0.300
0.100

5.10
357.000
0.219
58.650
1.530
0.510

m2
bh
m3
kg
HOK
HOK

Rp
Rp
Rp
Rp
Rp

500
85,000
1,400
45,000
65,000

Sub Total III


IV

1 Pek. Pas. Bata Bak Hydran SP 1 : 4


Batu Bata
Semen PC
Pasir Pasang
Tukang Batu
Pekerja
2 Plesteran 1:4
Semen PC
Pasir Pasang
Tukang Batu
Pekerja
3 Pek. Acian
Semen PC
Tukang Batu
Pekerja

1 Pek. Mata Kran 3/4"


Kran Air
Selotip
Tukang
Pekerja
2 Pek. Stop Kran 1 " (Penyedot)
Stop Kran
Selotip
Tukang
Pekerja
3 Pek.Pipa PVC 1" (Pentilasi)
Pipa PVC SNI 1"
Selang Air
Asesoris
Tukang
Pekerja

VI

PEKERJAAN SPAL
A PEKERJAAN SALURAN
1 GALIAN TANAH
Pekerja
2 PASANGAN BATA
Batu Bata
Pasir Pasang
Semen PC
Pekerja
Tukang Batu
3 PLESTERAN 1 : 4
Pasir Pasang
Semen PC
Pekerja
Tukang Batu
B PEKERJAAN LUBANG PEMBUANGAN
1 GALIAN TANAH
Pekerja
2 PASANGAN BATA 1 : 4
Batu Bata
Pasir Pasang
Semen PC
Pekerja
Tukang Batu

Total

Total

Total
Sub Total IV

Total

Total

Total
Sub Total V

Total

Total

Total

Total

Total

m3

3 PEKERJAAN PLAT PENUTUP LUBANG


Besi Beton Polos
Kawat Beton Polos
Kayu Kls. III Balok
Kayu Kls. III papan
Kerikil beton
Paku Biasa
Pasir Beton
Semen PC
Pekerja
Tukang Batu
Tukang Besi
Tukang Kayu
4 PEKERJAAN PLESTERAN 1 : 4
Pasir Pasang
Semen PC
Pekerja
Tukang Batu
VII

VIII

PENGECETAN/FINISING
1 Pek. Cat
Plamur Tembok
Cat Dasar
Cat Tembok
Tukang Cat
Pekerja

ALAT
Cangkul
Sekop
Linggis
Ember

Total

100.000
2.250
0.120
0.320
0.780
3.200
0.520
225.000
1.100
0.350
0.120
0.110

0.10
10.000
0.225
0.012
0.032
0.078
0.320
0.052
22.500
0.110
0.035
0.012
0.011

m3
kg
kg
m3
m3
m3
kg
m3
kg
HOK
HOK
HOK
HOK

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

9,000
20,000
1,750,000
1,750,000
115,000
14,000
85,000
1,400
45,000
65,000
65,000
65,000

0.024
6.240
0.300
0.150

5.20
0.125
32.448
1.560
0.780

m2
m3
kg
HOK
HOK

Rp
Rp
Rp
Rp

85,000
1,400
45,000
65,000

0.100
0.100
0.260
0.063
0.020

17.390
1.739
1.739
4.521
1.096
0.348

m2
m2
m2
HOK
HOK

Rp
Rp
Rp
Rp
Rp

7,600
5,000
16,000
65,000
45,000

1.000
1.000
1.000
2.000

1.000
1.000
1.000
1.000
2.000

Unit
Unit
Unit
Unit

Rp
Rp
Rp
Rp

50,000
50,000
35,000
15,000

Total
Sub Total VI

Total
Sub Total VII

Total
Sub Total VIII
Jumlah Total
Total 12 Unit

PROGRAM PAMSIMAS
AN AIR MINUM & SANITASI BERBASIS MASYARAKAT)
ANALISA & RAB HYDRAN UMUM
/ Kecamatan/ Desa : Gorontalo/ Boalemo/ Wonosari / Harapan
: Hydran Umum
: 12 Unit
Biaya (Rp)
Total
6=2x5
Rp
Rp
Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

151,200
2,016
88,200
46,800
32,400
320,616
320,616

48,438
48,438
###
30,498
4,037
34,535

Rp
Rp
Rp
Rp
Rp
Rp

311,040
591,494
114,566
126,360
6,055
1,149,516

Rp
Rp

9,945
9,945

Rp
Rp
Rp

13,005
1,434
14,439

Rp

1,256,872

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

141,278
8,372
282,555
13,455
94,185
13,216
26,820
6,802
2,332
2,332
16,146
607,493

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

76,545
4,536
153,090
9,720
51,030
7,436
15,090
2,896
16,427
14,742
41,189
392,700

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

50,400
2,520
85,050
4,032
28,350
4,131
8,384
23,625
1,609
9,126
8,190
22,883
248,299

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

76,545
4,536
153,090
9,720
51,030
7,436
15,090
2,896
16,427
14,742
41,189
392,700

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

124,268
7,364
248,535
11,835
82,845
11,625
23,591
5,983
2,051
2,051
49,426
569,574

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

17,010
1,008
34,020
1,620
11,340
1,591
3,229
819
281
281
1,944
73,143

Rp

2,283,910

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

216,507
96,600
21,930
39,000
81,000
455,037
###
122,304
28,560
136,500
189,000
476,364
63,700
91,000
126,000
280,700
1,212,101
###
100,000
400
26,000
1,800
128,200

Rp
Rp
Rp
Rp
Rp

60,000
1,400
3,900
16,200
81,500

Rp
Rp
Rp
Rp
Rp
Rp
Rp

11
15,000
1,800
3,900
16,200
36,911
246,611

Rp
Rp

36,450
36,450

Rp
Rp
Rp
Rp
Rp
Rp

266,000
27,778
122,360
102,600
49,400
568,138

Rp
Rp
Rp
Rp
Rp

28,560
122,304
189,000
136,500
476,364

Rp
Rp

60,750
60,750

Rp
Rp
Rp
Rp
Rp
Rp

178,500
18,641
82,110
68,850
33,150
381,251

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

90,000
4,500
21,000
56,000
8,970
4,480
4,420
31,500
4,950
2,275
780
715
229,590

Rp
Rp
Rp
Rp
Rp
Rp

10,608
45,427
70,200
50,700
176,935
1,929,478

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

###
13,216
8,695
72,342
71,212
15,651
181,117
181,117
###
50,000
50,000
35,000
30,000
165,000
165,000
7,595,705
91,148,459

PROGRAM PAMSIMAS
(PROGRAM PENYEDIAAN AIR MINUM DAN SANITASI BERBASIS MASYARAKAT)
RENCANA ANGGARAN BIAYA
Propinsi / Kabupaten / Kecamatan / Desa : Gorontalo / Boalemo / Wonosari/ Harapan
NO RAB : 2
Pekerjaan : Sarana Air Minum
NO
1

Sub Pekerjaan
Dimensi
URAIAN

Bahan
Pipa PVC SNI 1"
Asesoris Pipa
Batu Bata
Batu Kali/Batu Gunung
Besi Beton Polos
Cat Dasar
Cat Tembok
Kawat Beton Polos
Kayu Kls. III Balok
Kayu Kls. III Papan
Kerikil
Kran
Paku Biasa
Pasir Urug
Pasir Pasang
Pasir Beton
Plamur Tembok
Seal Tape
Semen PC
Stop Kran
Selang Air

TOTAL
1.200
0.240
1,322.015
3.110
116.260
1.739
4.521
2.744
0.112
0.360
0.880
4.000
2.488
0.512
2.949
0.587
1.739
0.450
1,140.414
1.000
1.000

Alat
Cangkul
Sekop
Linggis
Ember
Upah
Pekerja
Tukang Batu

VOLUME
KONTRIBUSI MASYARAKAT
IN CASH
IN KIND
570.207
-

1.555
0.050
0.153
0.440
0.154
0.885
0.450
1.000

1.000
1.000
1.000
2.000

1.000
1.000
1.000
2.000

27.861
14.280

27.861
-

APBN

SATUAN

APBD

1.200
0.240
1,322.015
1.555
116.260
1.739
4.521
2.744
0.062
0.207
0.440
4.000
2.488
0.358
2.064
0.587
1.739
570.207
1.000
-

14.280

HARGA SATUAN
(Rp)

m
ls
bh
m3
Kg
kg
kg
kg
m3
m4
m3
bh
kg
m3
m3
m3
kg
bh
Kg
bh
m

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

bh
bh
bh
bh

hok
hok

Jumlah Unit

9
7,500
500
100,000
9,000
5,000
16,000
20,000
1,750,000
1,750,000
115,000
25,000
14,000
85,000
85,000
85,000
7,600
4,000
1,400
60,000
15,000
Sub Total I

: Hydran Umum
: 12 Unit

BIAYA
KONTRIBUSI MASYARAKAT
INCASH
IN KIND

TOTAL
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

11
1,800
661,007
311,040
1,046,340
8,695
72,342
54,882
195,825
630,245
101,175
100,000
34,832
43,503
250,643
49,854
13,216
1,800
1,596,580
60,000
15,000
5,248,790

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

798,290
798,290

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

155,520
88,121
267,944
50,587
13,051
75,193
1,800
15,000
667,216

Rp
Rp
Rp
Rp

50,000 Rp
35,000 Rp
50,000 Rp
15,000 Rp
Sub Total II Rp

50,000
35,000
50,000
30,000
165,000

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

50,000
35,000
50,000
30,000
165,000

Rp
Rp

45,000
65,000

Rp
Rp

1,253,735
928,179

Rp
Rp

Rp
Rp

1,253,735
-

Rp
Rp
Rp

2,181,915
7,595,705
91,148,459

Rp
Rp
Rp

798,290
9,579,478

Rp
Rp
Rp

1,253,735
2,085,951
25,031,414

Sub Total III


TOTAL
12

Boalemo,
Disetujui Oleh :
Ketua DPMU

Juni 2010

Dibuat Oleh :
Koordinator LKM

CF Teknik

Satlak Pamsimas

Rifaldi Alam Rivai, ST

PROGRAM PAMSIMAS
AIR MINUM DAN SANITASI BERBASIS MASYARAKAT)
ENCANA ANGGARAN BIAYA
atan / Desa : Gorontalo / Boalemo / Wonosari/ Harapan

BIAYA
APBN

Boalemo,

APBD

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

11
1,800
661,007
155,520
1,046,340
8,695
72,342
54,882
107,704
362,301
50,587
100,000
34,832
30,452
175,450
49,854
13,216
798,290
60,000
3,783,285

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp

928,179

Rp
Rp

Rp
Rp
Rp

928,179
4,711,464
56,537,567

Rp
Rp
Rp

Juni 2010

Dibuat Oleh :
Satlak Pamsimas

REKAPITULASI RENCANA TERMIN

NO

URAIAN

2
1. Pek Sumur Gali ( 3Unit)
a). Bahan
b). Alat
c). Upah

TOTAL
3=4+5+6+7

TERMIN 1

Rp
Rp
Rp
Rp

2. Promosi Kesehatan Masyarakat


a). Promkes STOP BABS
Rp
b). Promkes Penggunaan air bersih yang sehat dan aman dari pencema Rp
c). CTPS
Rp
Rp
3. Hidran Umum ( 1 Unit )
a). Bahan
Rp
b). Alat
Rp
Rp

TOTAL TERMIN 1

Rp

BIAYA (Rp)
KONTRIBUSI MASYARAKAT
IN CASH
IN KIND
4
5

22,073,351
189,000
7,810,156
30,072,507

Rp
Rp
Rp
Rp

4,028,719
4,028,719

Rp

544,000
358,500
1,166,000
2,068,500

Rp

Rp

5,093,098
1,052,770
6,145,868

Rp

Rp

38,286,875

Rp

4,028,719

Rp

TERMIN 2
1. Pek. Sumur Bor Dalam
a). Bahan
c). Upah
2. Pek Menara (1 Unit)
a). Bahan
b). Alat
c). Upah
3. Pek. Jaringan Pipa 2.700 M ( Dusun 2 dan 3)
a). Bahan
b). Alat
c). Upah

Rp
Rp
Rp

16,827,000
10,000,000
26,827,000

Rp
Rp

Rp

Rp
Rp
Rp
Rp

19,091,519
150,000
5,527,752
24,769,272

Rp
Rp
Rp
Rp

3,217,000
150,000
351,077
3,718,077

Rp

Rp
Rp
Rp
Rp

48,482,662
8,048,171
56,530,834

Rp
Rp
Rp
Rp

2,727,900
525,350
3,253,250

Rp

TOTAL TERMIN 2

Rp

108,127,105

Rp

6,971,327

Rp

TERMIN 3
1. Pek. Hidran Umum (9 Unit)
a). Bahan
b). Upah

Rp
Rp
Rp

40,744,784
8,422,157
49,166,942

Rp
Rp
Rp

Rp

Rp
Rp
Rp

135,303
135,303

Rp
Rp

Rp

Rp
Rp
Rp
Rp
Rp
Rp

1,085,000
167,050
812,750
1,219,000
3,283,800
4,500,000

Rp

Rp

TOTAL TERMIN 3

Rp

57,086,045

Rp

Rp

TOTAL

Rp

203,500,025

Rp

11,000,045

Rp

Rp

203,500,000

Rp

11,000,000

Rp

2. Pek Rumah Pompa ( 1 Unit)


a). Bahan
b). Upah
3. Promkes
a). Promkes " pengelolaan Sampah"
b). Promkes "saluran Pembuangan air limbah (SPAL)
c). CLTS
d). Promkes Sekolah
4) Pelatihan Badan Pengelola Sarana (BPS)

APBN

SARANA SANITASI (SS)


1. Washtafel Sekolah (2 Unit)
a). Bahan
b). Alat
c). Upah
Sub Total 1
2. WC Sekolah (1 Unit)
a). Bahan
b). Alat
c). Upah
Sub Total 2

II

Total Sarana Sanitasi (1 + 2)


PELATIHAN
a) Pelatihan Satlak dan Lembaga Keswadayaan Masyarakat (LKM)
Total Pelatihan

III

BIAYA OPERASIONAL LKM


Total BOP
Grand Total (I + II + III + IV + V)
Sisa Dana
Total Dana Bantuan
Terbilang

Rp
Rp
Rp
Rp
Rp

1,149,349
956,651
2,106,000
2,106,000

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp
Rp

8,315,092
150,000
3,928,991
12,394,082
12,394,082
14,500,000

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp

Rp

Rp

4,500,000
Rp

Rp

Rp
Rp
Rp

11,000,000

Rp
Rp
Rp

Rp
4,500,000
Rp
4,500,000
Rp
8,500,000
Rp
8,500,000
Rp
27,500,000
Rp
27,500,000
Rp231,000,000

Rp231,000,000
Dua Ratus Tiga Puluh Satu Ribu Rupiah

PITULASI RENCANA TERMIN

BIAYA (Rp)

TERMIN 1

APBN

TOTAL

BOBOT (%)
8

Rp
Rp
Rp
Rp

18,044,632
189,000
7,810,156
26,043,788

Rp
Rp
Rp
Rp

22,073,351
189,000
7,810,156
30,072,507

Rp
Rp
Rp
Rp

544,000
358,500
1,166,000
2,068,500

Rp
Rp
Rp
Rp

544,000
358,500
1,166,000
2,068,500

0.24%
0.16%
0.50%
0.90%

Rp
Rp
Rp

5,093,098
1,052,770
6,145,868

Rp
Rp
Rp

5,093,098
1,052,770
6,145,868

Rp

34,258,156

Rp

38,286,875

2.20%
0.46%
2.66%
16.57%

Rp
Rp
Rp

16,827,000
10,000,000
26,827,000

Rp
Rp
Rp

16,827,000
10,000,000
26,827,000

7.28%
4.33%
11.61%

Rp
Rp
Rp
Rp

15,874,519
5,176,676
21,051,195

Rp
Rp
Rp
Rp

19,091,519
150,000
5,527,752
24,769,272

8.26%
0.06%
2.39%
10.72%

Rp
Rp
Rp
Rp

45,754,762
7,522,821
53,277,584

Rp

48,482,662

Rp
Rp

8,048,171
56,530,834

20.99%
0.00%
3.48%
24.47%

9.56%
0.08%
3.38%
13.02%

TERMIN 2

Rp

101,155,779

Rp

108,127,105

46.81%

TERMIN 3

APBN

Rp
Rp
Rp

40,744,784
8,422,157
49,166,942

Rp
Rp
Rp

40,744,784
8,422,157
49,166,942

Rp

135,303

Rp

135,303

Rp
Rp
Rp

135,303
135,303

0.06%
0.00%
0.06%

Rp
Rp
Rp
Rp
Rp
Rp

1,085,000
167,050
812,750
1,219,000
3,283,800
4,500,000

Rp
Rp
Rp
Rp
Rp
Rp

1,085,000
167,050
812,750
1,219,000
3,283,800
4,500,000

0.47%
0.07%
0.35%
0.53%
1.42%
1.95%

Rp

57,086,045

Rp

57,086,045

24.71%

Rp

192,499,979

Rp 203,500,025

88%

Rp

192,500,000

Rp 203,500,000

88%

17.64%
3.65%
21.28%

Rp
Rp
Rp
Rp
pembulatan

Rp
Rp
Rp
Rp
Rp

1,149,349
956,651
2,106,000
2,106,000

0.50%
0.00%
0.41%
0.91%

Rp
Rp
Rp
Rp
Pembulatan
Rp

Rp
Rp
Rp
Rp
Rp
Rp

8,315,092
150,000
3,928,991
12,394,082
12,394,082
14,500,000

3.60%
0.06%
1.70%
5.37%

Rp

4,500,000

1.95%

Rp
Rp
Rp
Rp
Rp
Rp

4,500,000
4,500,000
8,500,000
8,500,000
27,500,000
27,500,000
27,500,000

1.95%

Rp

Rp
Rp

192,500,000
192,500,000

Rp231,000,000
Dua Ratus Tiga Puluh Satu Ribu Rupiah

6.28%

3.68%
3.68%
11.90%
100.00%
100.00%

Pekerjaan
Jumlah Unit Bangunan
No.

:
:

SUMUR GALI
3
Unit

Sket

Perhitungan

Vol

Perhitungan Volume dan Material


I

Pek.Persiapan
1 Pengukuran Bouplank dan Profil
Panjang Pengukuran Bouplank dan Profil
P
3.5

3.5

14

14.00
3.5

3.5

3.5

3.5
II

Pek. Lubang Sumur


1 Galian Tanah

Volume Galian tanah


1.3

13.27

r2

3.14

0.65

3.14

0.42

1.32665

m2

Tnggi

1.32665

10.00

13.2665

^2

10
V

III

Pek. Mulut Sumur


1 Pek. Pasang Bata Mulut Sumur

Volume Pek. Pasangan Bata Mulut Sumur

1.3

Kllng

2 Pek. Plesteran

4.08

3.14

0.65

4.082

m2

Kllng

Tnggi

4.082

1.00

4.082

m3

Volume Pek. Plesteran


1.3

Kllng

8.16

3.14

0.65

4.082

m2

Kllng

Tnggi

4.082

1.00

4.082

m2

3.14

0.50

3.14

m2

Kllng

Tnggi

3.14

1.00

3.14

3.14

0.15

0.942

m2

4.082

3.14

0.942

8.164

m2

1
V

Kllng

1
V

Kllng
0.15

Vtot

IV

Pek. Lantai
1 Pek. Pasangan Bata Pembatas lantai

Volume Pek. Pasangan Bata Pembatas Lantai


L
0.4

=
=
=

Lbr
3
1.2

x
x
m2

4.80
Tggi
0.4

=
=
=

L
1.2
4.8

x
x
m2

Jmlh
4

sisi

2 Pek. Pasangan Batu Kosong


3

Volume Pek. Pasangan Batu Kosong

1.53

=
=
=

Lbr
3
9

x
x
m2

Pjg
3

Vtotl

=
=
=

Ltot
7.67335
1.53467

x
x
m3

Tinggi
0.20

Ltot

=
=
=

L
9
7.67335

m2

L mulut sumur
1.33

0.2
3

PERHITUNGAN VOLUME SUMUR GALI

Halaman 42 dari 113

Pekerjaan
Jumlah Unit Bangunan
No.

:
:

SUMUR GALI
3
Unit

Sket

Perhitungan

3 Pek. Lantai Sumur

Vol

Volume Pek. Lantai Sumur

0.54

=
=
=

Lbr
3
9

x
x
m2

Vtotl

=
=

Ltot
7.67335

x
x

0.53713

Pjg
3

Ltot

=
=
=

L
9
7.67335

m2

L mulut sumur
1.33

0.07
3

4 Pek. Plesteran

Volume Pek. Plesteran


0.15

L1

0.06

Lbr

Pjg

0.15

12

1.8

Lbr

Pjg

0.06

12

0.72

m2

Lbr

Pjg

0.15

12

1.8

m2

=
=
=

Lbr
0.25
0.1375

x
x
m3

Pjg
0.25

x
x

Vtot

=
=
=

V
0.1375
0.275

x
x
m3

Jumlah
2

Kolom

L2

12
0.15

L3

12

Pek. Beton
1 Pek. Kolom 25/25

4.32

12

Tinggi
0.07
3

Ltot

L1

L2

L3

1.8

0.72

1.8

4.32

Volume Kolom

0.25

2.2

0.28
Tggi
2.2

0.25

VI

Pek. SPAL
a Saluran Pembuangan
1 Galian Tanah

Volume Galian tanah

=
=
=

1.22
Lbr
0.45
1.215

x
x
m3

Pjg
9

x
x

Tggi
0.3

0.3
0.45
2 Pas. Bata

Volume Pas. Bata

8.55

=
=
=

Lbr
9
3.6

x
x
m2

Tggi
0.4

L1

=
=
=

Lbr
3.6
7.2

x
x
m2

Jumlah
2

0.4

L2

=
=
=

Lbr
9
1.35

x
x
m2

Tggi
0.15

Ltot

=
=
=

L1
7.2
8.55

+
+
m2

L2
1.35

9
2

0.15

Kiri & Kanan

9
3 Pek. Plesteran

Volume Pek. Plesteran

0.15

L1

=
=
=

Lbr
9
4.05

x
x
m2

Tggi
0.15

x
x

Jumlah
3
Kiri,Kanan,Bawah

0.25

L2

=
=
=

Lbr
9
4.5

x
x
m2

Tggi
0.25

x
x

Jumlah
2

Sisi

=
=
=

Lbr
9
7.2

x
x
m2

Tggi
0.4

x
x

Jumlah
2

Sisi

=
=
=

L1
4.05
15.75

+
+
m2

L2
4.5

+
+

L3
7.2

9
2
9
3

15.75

0.4

L3

9
Ltot

b Lubang Pembuangan
1 Galian Tanah

Volume Galian tanah

=
=
=

1.50
Lbr
1
1.5

x
x
m3

Pjg
1

x
x

Tggi
1.5

1.5

PERHITUNGAN VOLUME SUMUR GALI

Halaman 43 dari 113

Pekerjaan
Jumlah Unit Bangunan
No.

:
:

SUMUR GALI
3
Unit

Sket
2

Perhitungan

Pek. Pas. Bata

Vol

Volume Pas. Bata

L1
1.5

5.10
=

Lbr

Tggi

Jumlah

0.7

1.5

2.1

m2

Lbr

Tggi

Jumlah

1.5

m2

=
=
=

L1
2.1
5.1

+
+
m2

sisi

0.7
L2

2
1.5
1

Ltot

Pek. Plat Penutup Lubang

sisi

L2
3

Volume Plat Penutup Lubang

0.10

Lbr

Pjg

Tggi

0.1

0.1

m3

L1

=
=
=

Lbr
0.7
4.2

x
x
m2

Tggi
1.5

x
x

L2

=
=
=

Lbr
1
1

x
x
m2

Tggi
1

Ltot

=
=
=

L1
4.2
5.2

+
+
m2

L2
1

0.1
1
4 Pek. Plesteran

Volume Plesteran

1
1.5

0.7
2
1

VII

Pengecatan
1 Dinding Luar Bibir Sumur

5.20
Jumlah
4
sisi

Luas Pengecatan

1.3

2 Dinding Atas Bibir Sumur

7.95

Kllng

=
=
=

2
2
4.082

x
x
m2

3.14

=
=
=

Kllng
4.082
4.082

x
x
m2

Tnggi
1.00

Kllng

=
=
=

2
2
0.942

x
x
m2

3.14

Vtot

Kllng

0.942

0.44

m2

=
=
=

lbr
0.25
0.55

x
x
m2

Tnggi
2.20

Ltot

=
=
=

L
0.55
3.3

x
x
m2

Jmlh
6

=
=
=

lbr
0.25
0.3125

x
x
m2

Tnggi
1.25

Ltot

=
=
=

L
0.3125
0.625

x
x
m2

Jmlh
2

sisi

3.3

0.15

x
x

r
0.65

Vtot

x
x

=
=
=

V
4.082
3.58

m2

lbr Kolom
0.25
-

0.25

r
0.15

lbr Kolom
0.25

0.25

3 Kolom 25/25

2.2

sisi

0.25

1.25

0.25

Luas Total Plesteran & Acian


3.58
=
+
0.44
=
7.95
m2

PERHITUNGAN VOLUME SUMUR GALI

0.625

Halaman 44 dari 113

Sat

Keterangan

m1

m3

32.66
m3

70
2285.92
16001

m2

m2

336
2352

m3

PERHITUNGAN VOLUME SUMUR GALI

Halaman 45 dari 113

Sat

Keterangan

m3

m2

m3

m3

m2

m2

m3

PERHITUNGAN VOLUME SUMUR GALI

Halaman 46 dari 113

Sat

Keterangan

m2

m3

m2

m2

PERHITUNGAN VOLUME SUMUR GALI

Halaman 47 dari 113

PROGRAM PAMSIMAS
(PENYEDIAAN AIR MINUM & SANITASI BERBASIS MASYARAKAT)
ANALISA RAB SUMUR GALI 10 M & SPAL
Propinsi / Kabupaten / Kecamatan / Desa : Gorontalo / Boalemo / Mananggu/ Keramat
NO RAB : 3
Pekerjaan/ Kegiatan

NO

Sub Pekerjaan
Dimensi

: Sarana Air Minum

URAIAN

KOEF.

1
PEKERJAAN PEMASANGAN BOWPLANK
Kayu 5/7 Klas III
Kayu Papan 3/20 Klas III
Paku Biasa 2" - 5"
Pekerja
Tukang Kayu

VOLUME

SAT.

0.01
0.01
0.02
0.10
0.10

3
14.00
0.17
0.10
0.28
1.40
1.40

4
m1
m
m
kg
hok
hok

0.74

13.27
9.75

m
hok

1.00
0.04
4.34
0.64
0.25

10.00
10.00
0.43
43.36
6.40
2.50

m
m
m
kg
hok
hok

1.00
0.15
0.15
0.65

1.00
1.00
0.15
0.15
0.65

ls
ls
m
m
hok

70.00
0.04
5.75
0.32
0.10

4.08
285.74
0.18
23.47
1.31
0.41

m
bh
m
kg
hok
hok

0.04
9.48
0.32
0.10

8.16
0.34
77.35
2.61
0.82

m2
m
kg
hok
hok

70.00
0.04
5.75
0.32
0.10

LS
4.80
340.00
0.21
27.60
1.54
0.48

m2
bh
m
kg
hok
hok

1.15
0.30
0.43
0.39

1.53
1.76
0.46
0.65
0.60

m
m
m
hok
hok

0.87
0.52
175.00
1.65
0.25

0.54
0.47
0.28
94.00
0.89
0.13

m
m
m
kg
hok
hok

0.04
10.94
0.25
0.20

4.32
0.18
47.24
1.08
0.86

m2
m
kg
hok
hok

Total
Sub Total I
II
A

PEKERJAAN LUBANG SUMUR


PEKERJAAN GALIAN TANAH
Pekerja
PEKERJAAN PASANGAN BUIS BETON
Buis Beton dia 100cm
Pasir Pasang
Semen PC
Pekerja
Tukang Batu

Total

Total
C

PEK. PEMASANGAN SARINGAN SUMUR


Ijuk
Kerikil
Pasir
Pekerja
Total
Sub Total II

III
A

IV
A
B

PEKERJAAN MULUT SUMUR


PEKERJAAN PASANGAN BATA MULUT SUMUR
Batu Bata
Pasir Pasang
Semen PC
Pekerja
Tukang Batu
Total
PEKERJAAN PLESTERAN 1 : 4
Pasir Pasang
Semen PC
Pekerja
Tukang Batu
Total
Sub Total III
PEKERJAAN LANTAI
PEKERJAAN PENIMBUNAN DAN PERATAAN TANAH
PEKERJAAN PASANGAN BATA PEMBATAS LANTAI
Batu Bata
Pasir Pasang
Semen PC
Pekerja
Tukang Batu
Total
PEKERJAAN PASANGAN BATU KOSONG
Batu Kali / Belah
Pasir Urug
Pekerja
Tukang Batu
Total
PEKERJAAN LANTAI SUMUR
Kerikil beton
Pasir Beton
Semen PC
Pekerja
Tukang Batu
Total
PEKERJAAN PLESTERAN 1 : 4
Pasir Pasang
Semen PC
Pekerja
Tukang Batu
Total
Sub Total IV

PEKERJAAN TIANG BETON


Besi Beton Polos
Kawat Beton Polos
Kayu Kls. III Balok
Kayu Kls. III papan
Kerikil beton
Paku Biasa
Pasir Beton
Semen PC
Pekerja
Tukang Batu
Tukang Besi
Tukang Kayu

VI
A

PEKERJAAN SPAL
PEKERJAAN SALURAN
GALIAN TANAH
Pekerja
PEKERJAAN PASANGAN BATA
Batu Bata
Pasir Pasang
Semen PC
Pekerja
Tukang Batu

105.00
2.25
0.15
0.40
0.78
2.00
0.52
225.00
1.10
0.35
1.05
0.11

0.28
25.88
0.62
0.04
0.11
0.21
0.55
0.14
61.88
0.30
0.10
0.29
0.03

kg
kg
m
m
m
kg
m
kg
hok
hok
hok
hok

0.38

1.22
0.47

m
hok

70.00
0.04
5.75
0.32
0.10

8.55
598.50
0.37
49.16
2.74
0.86

m2
bh
m
kg
hok
hok

0.04
10.94
0.25
0.20

15.75
0.66
172.23
3.94
3.15

m2
m
kg
hok
hok

0.74

1.50
1.10

m
hok

70.00
0.04
5.75
0.32
0.10

5.10
357.00
0.22
29.33
1.63
0.51

m2
bh
m
kg
hok
hok

100.00
2.25
0.12
0.32
0.78
3.20
0.52
225.00
1.10
0.35
0.12
0.11

0.10
10.00
0.23
0.01
0.03
0.08
0.32
0.05
22.50
0.11
0.04
0.01
0.01

m
kg
kg
m
m
m
kg
m
kg
hok
hok
hok
hok

0.04
10.94
0.25
0.20

5.20
0.22
56.86
1.30
1.04

m2
m
kg
hok
hok

0.10
0.26
0.10
0.02
0.06

7.95
0.79
2.07
0.79
0.16
0.50

kg
kg
kg
hok
hok

2.00
24.00
1.00
1.00

1.00
2.00
24.00
1.00
1.00

bh
m
bh
m

1.00
2.00
1.00
1.00
1.00
12.00

1.00
1.00
2.00
1.00
1.00
1.00
12.00

bh
bh
bh
bh
bh
m

Total
Sub Total V

Total

Total
PEKERJAAN PLESTERAN 1 : 4
Pasir Pasang
Semen PC
Pekerja
Tukang Batu
Total

VII

PEKERJAAN LUBANG PEMBUANGAN


PEKERJAAN GALIAN TANAH
Pekerja
Total
PEKERJAAN PASANGAN BATA 1 : 4
Batu Bata
Pasir Pasang
Semen PC
Pekerja
Tukang Batu
Total
PEKERJAAN PLAT PENUTUP LUBANG
Besi Beton Polos
Kawat Beton Polos
Kayu Kls. III Balok
Kayu Kls. III papan
Kerikil beton
Paku Biasa
Pasir Beton
Semen PC
Pekerja
Tukang Batu
Tukang Besi
Tukang Kayu
Total
PEKERJAAN PLESTERAN 1 : 4
Pasir Pasang
Semen PC
Pekerja
Tukang Batu

PEKERJAAN FINISHING
Cat Dasar
Cat Tembok
Plamur Tembok
Pekerja
Tukang Cat

Total
Sub Total VI

Total
Sub Total VII
VIII

ASESORIS
Timba
Tali Timba
Kerekan
Besi Penyangga
Total
Sub Total VIII

IX

ALAT
Cangkul
Ember
Kuas
Linggis
Sekop
Tali
Total
Sub Total IX
Jumlah Total
Total 3 Unit

PROGRAM PAMSIMAS
AAN AIR MINUM & SANITASI BERBASIS MASYARAKAT)
ANALISA RAB SUMUR GALI 10 M & SPAL
/ Kecamatan / Desa : Gorontalo / Boalemo / Mananggu/ Keramat
Sub Pekerjaan
Dimensi

: Sumur Gali
: 3 Unit

HARGA
SATUAN (Rp)
5

TOTAL

APBD

6=2x5

Rp
Rp
Rp
Rp
Rp

1,750,000
1,750,000
14,000
45,000
65,000

Rp
Rp
Rp
Rp
Rp
Rp
Rp

294,000
###
171,500
###
3,920
###
63,000
###
91,000
###
623,420
623,420
###

Rp

45,000

Rp
Rp

438,789
###
438,789

Rp
Rp
Rp
Rp
Rp

350,000
85,000
1,400
45,000
65,000

Rp
Rp
Rp
Rp
Rp
Rp

3,500,000
###
36,550
###
60,704
###
288,000
###
162,500
###
4,047,754

Rp
Rp
Rp
Rp

15,000
115,000
85,000
45,000

Rp
15,000
###
Rp
17,250
###
Rp
12,750
###
Rp
29,250
###
Rp
74,250
Rp 4,560,793
###

Rp
Rp
Rp
Rp
Rp

500
85,000
1,400
45,000
65,000

Rp
Rp
Rp
Rp
Rp
Rp

142,870
###
14,920
###
32,860
###
58,781
###
26,533
###
275,964

Rp
Rp
Rp
Rp

85,000
1,400
45,000
65,000

Rp
Rp
Rp
Rp
Rp
Rp

29,145
###
108,295
###
117,562
###
53,066
###
308,069
584,032
###

Rp
Rp
Rp
Rp
Rp

500
85,000
1,400
45,000
65,000

Rp
Rp
Rp
Rp
Rp
Rp

170,000
###
17,544
###
38,640
###
69,120
###
31,200
###
326,504

Rp
Rp
Rp
Rp

100,000
85,000
45,000
65,000

Rp
Rp
Rp
Rp
Rp

176,487
###
39,134
###
29,351
###
38,904
###
283,876

Rp
Rp
Rp
Rp
Rp

115,000
85,000
1,400
45,000
65,000

Rp
Rp
Rp
Rp
Rp
Rp

53,740
###
23,741
###
131,598
###
39,882
###
8,728
###
257,690

Rp
Rp
Rp
Rp

85,000
1,400
45,000
65,000

Total
Sub Total I

Total

Total

Total
Sub Total II

Total

Total
Sub Total III

Total

Total

Total

Total
Sub Total IV

BIAYA (Rp)

Rp
15,422
###
Rp
66,135
###
Rp
48,600
###
Rp
56,160
###
Rp
186,317
Rp 1,054,387
###

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

9,000
20,000
1,750,000
1,750,000
115,000
14,000
85,000
1,400
45,000
65,000
65,000
65,000

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

232,875
###
12,375
###
72,188
###
192,500
###
24,668
###
7,700
###
12,155
###
86,625
###
13,613
###
6,256
###
18,769
###
1,966
###
681,689
681,689
###

Rp

45,000

Rp
Rp

20,995
###
20,995

Rp
Rp
Rp
Rp
Rp

500
85,000
1,400
45,000
65,000

Rp
Rp
Rp
Rp
Rp
Rp

299,250
###
31,250
###
68,828
###
123,120
###
55,575
###
578,023

Rp
Rp
Rp
Rp

85,000
1,400
45,000
65,000

Rp
Rp
Rp
Rp
Rp

56,228
###
241,117
###
177,188
###
204,750
###
679,282

Rp

45,000

Rp
Rp

49,613
###
49,613

Rp
Rp
Rp
Rp
Rp

500
85,000
1,400
45,000
65,000

Rp
Rp
Rp
Rp
Rp
Rp

178,500
###
18,641
###
41,055
###
73,440
###
33,150
###
344,786

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

9,000
20,000
1,750,000
1,750,000
115,000
14,000
85,000
1,400
45,000
65,000
65,000
65,000

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

90,000
###
4,500
###
21,000
###
56,000
###
8,970
###
4,480
###
4,420
###
31,500
###
4,950
###
2,275
###
###
780
###
715
229,590

Rp
Rp
Rp
Rp

85,000
1,400
45,000
65,000

Rp
18,564
###
Rp
79,607
###
Rp
58,500
###
Rp
67,600
###
Rp
224,271
Rp 2,126,559
###

Rp
Rp
Rp
Rp
Rp

5,000
16,000
7,600
45,000
65,000

Rp
Rp
Rp
Rp
Rp
Rp
Rp

3,975
###
33,068
###
6,041
###
7,154
###
32,551
###
82,789
82,789
###

Rp
Rp
Rp
Rp

7,000
4,000
37,500
100,000

Rp
Rp
Rp
Rp
Rp
Rp

14,000
###
96,000
###
37,500
###
100,000
###
247,500
247,500
###

Rp
Rp
Rp
Rp
Rp
Rp

50,000
15,000
15,000
35,000
50,000
4,000

Total
Sub Total V

Total

Total

Total

Total

Total

Total

Total
Sub Total VI

Total
Sub Total VII

Total
Sub Total VIII

Total
Sub Total IX
Jumlah Total
Total 3 Unit

Rp
50,000
###
Rp
30,000
###
Rp
15,000
###
Rp
35,000
###
Rp
50,000
###
Rp
48,000
###
Rp
228,000
Rp
228,000
###
Rp10,189,169
###
Rp30,567,507

RENCANA ANGGARAN BIAYA


NO RAB : 3
Pekerjaan/ Kegiatan

II

III

URAIAN
BAHAN
Batu Bata
Batu Kali / Belah
Besi Beton
Besi Penyangga
Buis Beton
Cat Dasar
Cat Tembok
Ijuk
Kawat Beton (Bendrat)
Kayu Bekisting
Kerekan/katrol
Kerikil
Pasir
Paku
Plamur
Semen
Tali Timba
Timba

TOTAL
2 = 3+4+5+6
1,581.24
1.76
35.88
1.00
10.00
0.79
2.07
1.00
0.84
0.46
1.00
0.91
3.89
1.15
0.79
704.97
24.00
2.00

VOLUME
KONTRIBUSI MASYARAKAT
IN CASH
IN KIND
3
4
35.88
2.07
704.97
-

APBN

APBD

SAT

NO

Sub Pekerjaan/ Kegiatan


Dimensi

: Sarana Air Minum

HARGA
SATUAN

TOTAL
9 = 10+11+12+13

BIAYA (Rp)
KONTRIBUSI MASYARAKAT
IN CASH
10 = 3x8

1,581.24
1.76
1.00
10.00
0.79
1.00
0.84
0.46
1.00
0.91
3.89
1.15
0.79
24.00
2.00

bh
m
kg
m
m
kg
kg
m
kg
m
bh
m
m
kg
kg
kg
m
bh

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

500
100,000
9,000
100,000
350,000
5,000
16,000
15,000
20,000
1,750,000
37,500
115,000
85,000
14,000
7,600
1,400
4,000
7,000
sub total 1

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

790,620
176,487
322,875
100,000
3,500,000
3,975
33,068
15,000
16,875
807,188
37,500
104,628
330,464
16,100
6,041
986,963
96,000
14,000
7,357,784

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

322,875
33,068
986,963
1,342,906

ALAT
Cangkul
Ember
Kuas
Linggis
Sekop
Tali

1.00
2.00
1.00
1.00
1.00
12.00

1.00
2.00
1.00
1.00
-

1.00
12.00

bh
bh
bh
bh
bh
m

Rp
Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp
Rp
Rp

50,000
30,000
15,000
35,000
50,000
48,000
228,000

Rp
Rp
Rp
Rp
Rp
Rp
Rp

UPAH
Pekerja
Tukang

50,000
15,000
15,000
35,000
50,000
4,000
sub total 2

38.02
13.73

38.02
13.73

hok
hok

Rp
Rp

45,000 Rp
65,000 Rp
sub total 3 Rp
TOTAL Rp
Rp
3

1,710,906
892,479
2,603,385
10,189,169
30,567,507

Rp
Rp
Rp
Rp
Rp

1,342,906
4,028,719

TOTAL UNIT :

RENCANA ANGGARAN BIAYA


Sub Pekerjaan/ Kegiatan

: Sumur Gali Dia. 1 m


: 4 Unit

BIAYA (Rp)
KONTRIBUSI MASYARAKAT
IN KIND
11 = 4x8

APBN

APBD

12 = 5x8

13 = 6x8

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

790,620
176,487
100,000
3,500,000
3,975
15,000
16,875
807,188
37,500
104,628
330,464
16,100
6,041
96,000
14,000
6,014,877

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp
Rp
Rp

50,000
30,000
35,000
50,000
165,000

Rp
Rp
Rp
Rp
Rp
Rp
Rp

15,000
48,000
63,000

Rp
Rp
Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

165,000
495,000

Rp
Rp
Rp
Rp
Rp

1,710,906
892,479
2,603,385
8,681,263
26,043,788

Rp
Rp
Rp
Rp
Rp

RENCANA PENGGUNAAN DANA TERMIN I (APBN + IN CASH + IN KIND)

Kegiatan : Sarana Air Minum

NO

URAIAN

Sumur Gali

I
a

APBN
Bahan
Batu Bata
Batu Kali / Belah

KEBUTUHA
N

VOLUME
Real. s/d Tahap
Pengajuan
Lalu
Sekarang

Jumlah
Kumulatif

Unit / Sat.

1,581.24
1.76

1,581.24
1.76

1,581.24
1.76

bh
m

Besi Penyangga
Buis Beton

1.00
10.00

1.00
10.00

1.00
10.00

m
m

Cat Dasar
Ijuk

0.79
1.000

0.79
1.00

0.79
1.00

kg
m

Kawat Beton (Bendrat)


Kayu Bekisting

0.844
0.461

0.84
0.46

0.84
0.46

kg
m

Kerekan/katrol
Kerikil

1.000
0.910

1.00
0.91

1.00
0.91

bh
m

Pasir
Paku
Plamur
Tali Timba
Timba

3.888
1.150
0.795
24.00
2.00

3.89
1.15
0.79

3.89
1.15
0.79

m
kg
kg

24.00
2.00

24.00
2.00

m
bh

Sub Total I
b

Alat
Kuas
Tali

1
12

1
12

1
12

bh
m

0.00
0.00

Hok
Hok

Sub Total II
c

Upah
Pekerja
Tukang

38.02
13.73

Sub Total III


Total Dana APBN (A + a + b + c)

II

IN CASH

Bahan
Besi Beton
Cat Tembok
Semen

35.88

35.88

35.88

kg

2.07
704.974

2.07
704.97

2.07
704.97

kg
kg

Total Dana IN-CASH


III

IN KIND

Alat
Cangkul

1.0

1.0

1.00

bh

Ember
Linggis

2.0
1.0

2.0
1.0

2.00
1.00

bh
bh

Sekop

1.0

1.0

1.00

bh

Total Dana In Kind


Total Dana APBN + In-Cash
Total Dana APBN + In-Cash + Inkind
Total Dana APBN + In-Cash + Inkind (Pembulatan) x 2 unit

IN CASH + IN KIND)

RPD Ke : 1

Harga Satuan (Rp)

Jumlah (Rp)

Rp
Rp

500
100,000

Rp
Rp

790,620
176,487

Rp
Rp

100,000
350,000

Rp
Rp

100,000
3,500,000

Rp
Rp

5,000
15,000

Rp
Rp

3,975
15,000

Rp
Rp

20,000
1,750,000

Rp
Rp

16,875
807,188

Rp
Rp

37,500
115,000

Rp
Rp

37,500
104,628

Rp
Rp
Rp

85,000
14,000
7,600

Rp
Rp
Rp

330,464
16,100
6,041

Rp
Rp

4,000
7,000

Rp
Rp

96,000
14,000

Rp

6,014,877.37

15,000.00 Rp
4,000.00 Rp

15,000.00
48,000.00

Rp

63,000.00

Rp
Rp

Rp
Rp

6,077,900.00

Rp
Rp

Rp
Rp

45,000.00
65,000.00

Rp

9,000

Rp

322,875.00

Rp
Rp

16,000
1,400

Rp
Rp

33,067.84
986,963.44

Rp

1,342,906.28

50,000 Rp
15,000 Rp
35,000 Rp

50,000.00

50,000 Rp
Rp
Rp

50,000.00
165,000.00
14,841,600.00

Rp
Rp

15,006,600.00
15,006,600.00

Rp
Rp
Rp
Rp

30,000.00
35,000.00

RENCANA PENGGUNAAN DANA TERMIN I (APBN + IN CASH + IN KIND)

Kegiatan : Sarana Air Minum

RPD Ke : 2
VOLUME

NO
A
I
a

URAIAN
Sumur Gali
APBN
Bahan
Batu Bata
Batu Kali / Belah
Besi Penyangga
Buis Beton
Cat Dasar
Ijuk
Kawat Beton (Bendrat)
Kayu Bekisting
Kerekan/katrol
Kerikil
Pasir
Paku
Plamur
Tali Timba
Timba
Alat
Kuas
Tali
Upah
Pekerja
Tukang

KEBUTUHA
Real. s/d
N
Tahap Lalu

1,581.24
1.76
1.00
10.00
0.79
1.000
0.844
0.461
1.000
0.910
3.888
1.150
0.795
24.00
2.00

1
12

38.02
13.73

Pengajuan
Sekarang

Jumlah
Kumulatif

1,581.24
1.76
1.00
10.00
0.79
1.00
0.84
0.46
1.00
0.91
3.89
1.15
0.79
24.00
2.00
Sub Total I

1
12
Sub Total II

38.02
13.73

1,581.24
1.76
1.00
10.00
0.79
1.00
0.84
0.46
1.00
0.91
3.89
1.15
0.79
24.00
2.00

Unit / Sat.

Harga Satuan (Rp)

bh
m
m
m
kg
m
kg
m
bh
m
m
kg
kg
m
bh

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

500
100,000
100,000
350,000
5,000
15,000
20,000
1,750,000
37,500
115,000
85,000
14,000
7,600
4,000
7,000

1
12

bh
m

Rp
Rp

15,000.00
4,000.00

38.02
13.73

Hok
Hok

Rp
Rp

45,000.00
65,000.00

Sub Total III


Total Dana APBN (A + a + b + c)
II
a

III
a

IN CASH
Bahan
Besi Beton
Cat Tembok
Semen
IN KIND
Alat
Cangkul
Ember
Linggis
Sekop

35.88
35.88
2.07
2.07
704.974
704.97
Total Dana IN-CASH

1.0
2.0
1.0
1.0

1.0
2.0
1.0
1.0

35.88
2.07
704.97

kg
kg
kg

Rp
Rp
Rp

9,000
16,000
1,400

1.00
2.00
1.00
1.00

bh
bh
bh
bh

Rp
Rp
Rp
Rp

50,000
15,000
35,000
50,000

Total Dana In Kind


Total Dana APBN + In-Cash
Total Dana APBN + In-Cash + Inkind
Total Dana APBN + In-Cash + Inkind (Pembulatan) x 2 unit

N KIND)

Jumlah (Rp)

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp

Rp
Rp
Rp
Rp

1,710,906.49
892,478.73
2,603,385.21
2,603,400.00

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

5,206,800.00
5,206,800.00
5,206,800.00

RENCANA PENGGUNAAN DANA TERMIN I (APBN + IN CASH + IN KIND)

Kegiatan : Sarana Air Minum

RPD Ke : 3
VOLUME

NO
A
I
a

URAIAN
Sumur Gali
APBN
Bahan
Batu Bata
Batu Kali / Belah
Besi Penyangga
Buis Beton
Cat Dasar
Ijuk
Kawat Beton (Bendrat)
Kayu Bekisting
Kerekan/katrol
Kerikil
Pasir
Paku
Plamur
Tali Timba
Timba

KEBUTUHA
Real. s/d
N
Tahap Lalu

Pengajuan
Sekarang

1,581.24
1.76
1.00
10.00
0.79
1.000
0.844
0.461
1.000
0.910
3.888
1.150
0.795
24.00
2.00

1,581.24
1.76
1.00
10.00
0.79
1.00
0.84
0.46
1.00
0.91
3.89
1.15
0.79
24.00
2.00

Jumlah
Kumulatif

1,581.24
1.76
1.00
10.00
0.79
1.00
0.84
0.46
1.00
0.91
3.89
1.15
0.79
24.00
2.00

Unit / Sat.

Harga Satuan (Rp)

bh
m
m
m
kg
m
kg
m
bh
m
m
kg
kg
m
bh

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

500
100,000
100,000
350,000
5,000
15,000
20,000
1,750,000
37,500
115,000
85,000
14,000
7,600
4,000
7,000

Sub Total I
b

Alat
Kuas
Tali
Upah
Pekerja
Tukang

1
12

Sub Total II

38.02
13.73

1
12

1
12

bh
m

Rp
Rp

15,000.00
4,000.00

38.02
13.73

38.02
13.73

Hok
Hok

Rp
Rp

45,000.00
65,000.00

Sub Total III


Total Dana APBN (A + a + b + c)
II
a

III
a

IN CASH
Bahan
Besi Beton
Cat Tembok
Semen
IN KIND
Alat
Cangkul
Ember
Linggis
Sekop

35.88
2.07
704.974

35.88
2.07
704.97
Total Dana IN-CASH

35.88
2.07
704.97

kg
kg
kg

Rp
Rp
Rp

9,000
16,000
1,400

1.0
2.0
1.0
1.0

1.0
2.0
1.0
1.0

1.00
2.00
1.00
1.00

bh
bh
bh
bh

Rp
Rp
Rp
Rp

50,000
15,000
35,000
50,000

Total Dana In Kind


Total Dana APBN + In-Cash
Total Dana APBN + In-Cash + Inkind
Total Dana APBN + In-Cash + Inkind (Pembulatan) x 1 unit

IN KIND)

Jumlah (Rp)

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

790,620
176,487
100,000
3,500,000
3,975
15,000
16,875
807,188
37,500
104,628
330,464
16,100
6,041
96,000
14,000
6,014,877.37

Rp
Rp
Rp

15,000.00
48,000.00
63,000.00

Rp
Rp
Rp
Rp

1,710,906.49
892,478.73
2,603,385.21
8,681,300.00

Rp
Rp
Rp
Rp

322,875.00
33,067.84
986,963.44
1,342,906.28

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

50,000.00
30,000.00
35,000.00
50,000.00
165,000.00
10,024,200.00
10,189,200.00
10,189,200.00

ANALISA & RAB WASHTAFEL

NO RAB : 4
Pekerjaan/ Kegiatan

NO

II

III

IV

Sub.Pek./Kegiatan : Pemasangan
Dimensi/Unit
: 2 Unit

: Sarana Sanitasi

URAIAN
1
PEKERJAAN GALIAN TANAH
Galian Tanah
Pekerja

PEKERJAAN PEMASANGAN PIPA


1 Pemasangan Pipa 3/4"
Pipa PVC AW 3/4"
Perlengkapan
Tukang Batu
Pekerja

PEK. PAS. WASHTAFEL


Washtafel
Perlengkapan
Semen PC
Pasir Pasang
Tukang Batu
Pekerja

PEK. PAS.STOP KRAN 1/2"


Kran Air
Seal Tape
Tukang Batu
Pekerja

Koef.

Volume

Satuan

0.384
Total
Sub Total I

1.10
0.35
0.06
0.35
Total
Sub Total II
1.00
0.11
6.00
0.01
2.00
1.30
Total
Sub Total III
1.00
0.03
0.10
0.01

Total
Sub Total IV
Jumlah Total

0.90
0.35

m3
hok

28.00
30.80
9.80
1.68
9.80

m
m
ls
HOK
HOK

2.00
2.00
0.23
12.00
0.02
4.00
2.60

ls
bh
m
kg
m
hok
hok

2.00
2.00
0.05
0.20
0.02

bh
bh
bh
hok
hok

ANALISA & RAB WASHTAFEL

Sub.Pek./Kegiatan : Pemasangan Washtafel


Dimensi/Unit
: 2 Unit
Biaya (Rp)
Harga Satuan
(Rp)

Total

6=2x5

45,000.00

Rp
Rp
Rp

15,551
15,551
15,551

Rp
Rp
Rp
Rp

8,750
1,750
65,000
45,000

Rp
Rp
Rp
Rp
Rp
Rp

269,500
17,150
109,200
441,000
836,850
836,850

Rp
Rp
Rp
Rp
Rp
Rp

390,000
58,500
1,400
85,000
65,000
45,000

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

780,000
13,221
16,800
1,700
260,000
117,000
1,188,721
1,188,721

Rp
Rp
Rp
Rp

25,389
4,000
65,000
45,000

Rp
Rp
Rp
Rp
Rp
Rp

50,778
200
13,000
900
64,878
64,878

Rp

2,106,000

Total
Sub Total I

Total
Sub Total II

Total
Sub Total III

Total
Sub Total IV
Jumlah Total

RENCANA ANGGARAN BIAYA

NO RAB : 4
Pekerjaan/ Kegiatan : Sarana Sanitasi

NO

Volume
Konstribusi Masyarakat

URAIAN

Total

1
1

2=3+4+5+6

BAHAN
Pipa PVC Dia. 3/4
Perlengkapan
Washtafel
Perlengkapan
Seal Tape
Semen PC
Pasir Pasang
Kran 1/2"

30.80
9.80
2.00
0.226
0.05
12.00
0.02
2.00

ALAT
Alat Bantu

UPAH
Tukang
Pekerja

Rp

5.88
12.77

inCash

inKind

APBN

APBD

30.80
9.80
2.00
0.23
0.05
12.00
0.02
2.00

Satuan

Harga Satuan (Rp)

5.88
12.77

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

m
ls
bh
ls
bh
kg
m
bh

hok
hok

Rp
Rp

Biaya (Rp)
Kontribusi
Total

inCash

9=2x8

8,750
1,750
390,000
58,500
4,000
1,400
85,000
25,389
Sub Total I

10=3x8

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

269,500
17,150
780,000
13,221
200
16,800
1,700
50,778
1,149,349

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

Rp
Sub Total II Rp

Rp
Rp

Rp
Rp

382,200
574,451

Rp
Rp

Sub Total III Rp


Jumlah Total Rp

956,651
2,106,000

Rp
Rp

65,000
45,000

RENCANA ANGGARAN BIAYA

Sub Pekerjaan
: Pemasangan Washtafel
Ukuran / Dimensi : 2 Unit
Biaya (Rp)
Kontribusi
Inkind
11=4x8
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

Rp
Rp

APBN

APBD

12=5x8

13=6x8
-

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

Rp
Rp

Rp
Rp

Rp
Rp

Rp
Rp

Rp
Rp

Rp
Rp

Rp
Rp

Rp
Rp

269,500.00
17,150.00
780,000.00
13,221.00
200.00
16,800.00
1,700.00
50,778.00
1,149,349
382,200
574,451
956,651
2,106,000

RENCANA PENGGUNAAN DANA TERMIN I (APBD)

Kegiatan : Sarana Sanitasi Sekolah

RPD Ke : 2
VOLUME

NO

URAIAN

Wastafel

I
a

APBN
Bahan
Pipa PVC Dia. 3/4
Perlengkapan
Washtafel

KEBUTUHA
Real. s/d
N
Tahap Lalu

Pengajuan
Sekarang

Jumlah
Kumulatif

Unit / Sat.

Harga Satuan (Rp)

30.80
9.80
2.00

30.80
9.80
2.00

30.80
9.80
2.00

m
ls
bh

Rp
Rp
Rp

8,750
1,750
390,000

Perlengkapan
Seal Tape

0.23
0.05

0.23
0.05

0.23
0.05

ls
bh

Rp
Rp

58,500
4,000

Semen PC
Pasir Pasang

12.00
0.02

12.00
0.02

12.00
0.02

kg
m

Rp
Rp

1,400
85,000

2.00

2.00

bh

Rp

25,389

Kran 1/2"

2.00
Sub Total I

Upah
Pekerja

12.77

Tukang

5.88

12.77

12.77

Hok

Rp

45,000.00

5.88
Sub Total III

5.88

Hok

Rp

65,000.00

Total Dana APBN + In-Cash

Jumlah (Rp)

Rp
Rp
Rp

269,500
17,150
780,000

Rp
Rp

13,221
200

Rp
Rp

16,800
1,700

Rp
Rp

50,778
1,149,349.00

Rp

574,450.79

Rp
Rp

382,200.00
956,650.79

Rp

2,106,000.00

Pekerjaan
Jumlah Unit Bangunan
No.

:
:

WC 2 Pintu
1
Unit

Sket

Perhitungan

Vol

Sat

11.00

m1

2.63

m3

0.21

m3

0.42

m3

1.58

m3

1.47

m2

0.93

m3

0.24

m3

0.27

m3

Keterangan

Perhitungan Volume dan Material


I

Pek.Persiapan
1 Pengukuran Bouplank dan Profil
Panjang Pengukuran Bouplank dan Profil
P

11

m2

3.5

3.5

3.5
II

Pek.Tanah
1 Galian Tanah

Volume Galian tanah


0.6
V

(a+b)

Tggi

2
0.5

0.4

0.6

0.5

0.25

0.25

10.5

2.625

m3

2
=
0.4

0.5
0.5

2 Urugan pasir Bawah Pondasi

0.5

0.25

m2

Volume Urugan Pasir Bawah Pondasi


V

0.05
6

Lbr

Pjg

Tggi

0.4

10.5

0.05

0.21

m3

0.4
3

Pekerjaan Timbrisan Batu Kosong

Volume Timbrisan Batu Kosong


V

0.1

Pjg

Tggi

0.4

10.5

0.1

0.42

Lbr

m3

(a+b)

Tggi

0.4

0.5

0.4
4 Pek. Pondasi Batu Kali
0.2

Volume Pas. Pondasi Batu Kali


L pondasi

0.2

0.6

2
0.5

0.15

p
10.5

0.15

1.575

m3

2
0.4

0.5
0.5

5 Pek. Pasangan Bata 1 : 2 teras

0.3

0.15

m2

Volume Pas. Bata Teras


L
0.35

0.35

4.2

0.35

4.2

1.47

m2

4.2
6 Pek. Urugan Tanah kembali

Volume Urugan Tanah Kembali


V1

V Galian Tanah

4
=

2.63

4
=

2.625

0.6563

1.5

1.5

V2

1.5
Vtot
0.6

III

Pek. Beton
1 Pek Sloof

m3

0.27

m3

0.15

0.27

V1

V2

0.6563

0.27

0.9263

m3

0.60

Volume Pek. Sloof


V

=
=

Lbr
0.15

x
x

0.2363

m3

=
=
=

Lbr
0.15
0.045

Vtot

=
=
=

V
0.045
0.27

10.5

0.15

Pjg
10.5

x
x

Tggi
0.15

x
x
m3

Pjg
0.15

x
x

Tggi
2

x
x
m3

Jumlah
6

Kolom

0.15
2 Pek. Kolom 15/15

Volume Kolom

0.15

0.15

PERHITUNGAN VOLUME WC 2 PINTU

Halaman 68 dari 113

Pekerjaan
Jumlah Unit Bangunan
No.

:
:

WC 2 Pintu
1
Unit

Sket

Perhitungan

3 Pek. Ring Balok

Volume Pek. Sloof


V

=
=
=

10.5

0.15

Lbr
0.15
0.2363

x
x
m3

Pjg
10.5

x
x

Vol

Sat

0.24

m3

17.11

m2

29.74

m2

0.12

m3

Keterangan

Tggi
0.15

0.15
IV

Pek. Pasangan Dinding


1

Pek. Pasangan Dinding 1 : 4

Volume Pek. Pasangan Dinding 1 : 4


L1

=
=
=

Lbr
1.35
2.7

x
x
m2

Tggi
2

L1

=
=
=

L
2.7
18.9

x
x
m2

Jumlah
7

Sisi

Tggi

1.35

0.5

0.5

=
=

1
2
1
2
1.35
2
0.675
0.3375

x
m2

0.5

=
=

L
19.575

17.11

m2

1.35

L2

=
0.5

L2

=
=
=

0.3375
0.3375
0.675

x
x
m2

Sisi
2

=
=
=

L1
18.9
19.575

+
+
m2

L2
0.675

1.35
Ltot

2 Plesteran & Acian


a Dinding Luar

L Kusen
2.17

L Jendela
0.3

Luas Plesteran Campuran 1 : 4

L1

=
=
=

Lbr
1.65
3.3

x
x
m2

Tggi
2

Ltot

=
=
=

L1
6.6
6.30

m2

L Jendela
0.3

L2

Lbr

Tggi

3.15

6.3

m2

Ltot

=
=
=

L1
12.6
9.93

m2

L2

Tggi

1.35

0.5

0.5

=
=

1
2
1
2
1.35
2
0.675
0.3375

x
m2

0.5

L3

=
=
=

Lbr
1.35
2.7

x
x
m2

Tggi
2

Ltot

=
=
=

L3
21.6
19.13

m2

L Kusen
2.17

2
1.65

3.15

0.5

=
1.35
=

L1

=
=
=

3.3
3.3
6.6

x
x
m2

Sisi
2

L2

6.3

Sisi

6.3

12.6

m2

L2

=
=
=

0.3375
0.3375
0.675

2.7
2.7
21.6

x
x
m2

Sisi
8

L Kusen
2.17

x
x
m2

Sisi
2

b Dinding Dalam
2
1.35

L3

=
=
=

L Jendela
0.3

Luas Total Plesteran & Acian


L2
9.93

=
=
=

Pek. Atap

+
+
m2

29.735

L2
0.675

+
+

L3
19.13

Volume Pek. Atap

Pek. Kuda-Kuda
6/10

6/10

6/10
6/10

1.5

0.55

Untuk Kuda-Kuda setengah


kuda-kuda ABC diketahui :
< A = 300
AB
0.75 m
=
=
AB
cos 300
cos 30

C
D
B

=
=

AC

A
0.75

Ukuran 6/12
Balok Tarik

0.75

1.5

AC

Kaki Kuda-Kuda

0.866

1.7321

0.75

Balok Makelar

0.55

0.55

AC

Balok Sokong

0.433

0.866

0.75

4.6481

cos 300

3 Buah Kuda-Kuda

AC

0.866

BD

0.5

AC

BD

0.433

4.65

13.944

0.6928

4.16

C
B

< A = 300

A
0.6

cos 300
cos 300

10%

PERHITUNGAN VOLUME WC 2 PINTU

Ukuran 6/12

=
=

AB

0.60

AB

Balok Tarik

AC
0.60

AC

Panjang Total Kuda-kuda


=

13.9

18.10

AC

AC

0.6928

=
=
=

Lbr
0.06
0.1086

x
x
m3

Pjg
18.10

x
x

Tggi
0.1

=
=

10%
0.011

0.11

Kayu Hilang

0.60

cos 300

4.16

=
=

0.1086
0.12

+
m3

0.01

Halaman 69 dari 113

Pekerjaan
Jumlah Unit Bangunan

:
:

No.

WC 2 Pintu
1
Unit

Sket

Perhitungan

Pek. Pemasangan seng gelombang

Volume Pek. Pemasangan Seng Gelombang


L1
3.1177

=
=

Pjng
4.2

x
x

13.1

m2

Vol

Sat

13.09

m2

0.55

m3

0.18

m3

0.18

m3

8.66

m3

0.06

m3

1.80

m2

0.01

m3

2.40

m2

3.74

m2

Keterangan

Lbr
3.12

4.2

VI

Pek. Lantai
1 Pek. Urugan Tanah Bawah Lantai

Volume Pek. Urugan Tanah Bawah Lantai


V

=
=
=

2.7

Lbr
1.35
0.5468

x
x
m3

Pjg
2.7

x
x

Tggi
0.15

0.15
1.35
2 Pek. Urugan Pasir Bawah Lantai

Volume Pek. Urugan Pasir Bawah Lantai


V

=
=
=

2.7

Lbr
2.7
0.1823

x
x
m3

Pjg
1.35

x
x

Tggi
0.05

0.05
1.35
3 Pek. Lantai Beton Tumbuk 1:3

Volume Pek. Lantai Beton Tumbuk 1:3


V

=
=
=

2.7

Lbr
2.7
0.1823

x
x
m3

Pjg
1.35

x
x

Tggi
0.05

0.05
1.35
VII

Pek. Plafond
1 Pekerjaan Plafond Tripleks & Rangka

Volume Pek. Plafond


L1

=
=
=

Pjng
1.35
1.8225

x
x
m2

Lbr
1.35

L1

=
=
=

Pjng
11.4
6.84

x
x
m2

Lbr
0.6

L tot

=
=
=

L1
1.8225
8.6625

+
+
m2

L2
6.84

1.35

1.35

0.6
11.4

VIII

Pek. Pintu

Pekerjaan Kusen

Volume Pek. Kusen

=
=

1.5
3.7

+
m1

1.5

0.7

=
=
=

Lbr
0.15
0.0278

x
x
m3

Pjg
0.05

x
x

Kllng
3.7

Vtot

=
=
=

V
0.0278
0.0555

x
x
m2

Jumllah
2

Kusen

150

P kusen

60

Pekerjaan Pintu Panil

Volume Pek. Pintu Panil

150

=
=
=

Lbr
0.6
0.9

x
x
m2

Tggi
1.5

Vtot

=
=
=

V
0.9
1.8

x
x
m2

Jumllah
2

Pintu

60

Pekerjaan Jendela

Volume Pek. Jendela

30

50
IX

P Roster

=
=

0.5
1.4

+
m1

0.2

0.5

=
=
=

Lbr
0.15
0.0105

x
x
m3

Pjg
0.05

x
x

Kllng
1.4

0.2

Pek. Instalasi Air


A
1

Pekerjaan Bak WC
Pasangan Bata

Volume Pasangan Bata


L

=
=
=

Pjng
0.8
0.6

x
x
m3

Lbr
0.75

L tot

=
=
=

0.6
0.6
2.4

x
x
m2

Sisi
4

0.8

0.75
2

Pasangan Tegel

Volume Pasangan Tegel

a Bak Luar

Bak Luar

0.8
0.4
0.75
0.75

0.75

PERHITUNGAN VOLUME WC 2 PINTU

L1

=
=
=

Pjng
0.8
0.6

x
x
m2

Lbr
0.75

L3

=
=
=

Pjng
0.75
0.5625

x
x
m2

Lbr
0.75

L2

=
=
=
=
=
=

Pjng
0.75
0.3
0.3
0.3
0.6

x
x
m2
x
x
m2

Lbr
0.4

L tot

=
=
=

L1
0.6
1.7625

+
+
m2

L2
0.6

+
+

L3
0.5625

Sisi
2

Halaman 70 dari 113

Pekerjaan
Jumlah Unit Bangunan
No.

:
:
Sket

PERHITUNGAN VOLUME WC 2 PINTU

WC 2 Pintu
1
Unit
Perhitungan

Vol

Sat

Keterangan

Halaman 71 dari 113

Pekerjaan
Jumlah Unit Bangunan
No.

:
:

WC 2 Pintu
1
Unit

Sket

Perhitungan

Vol

Sat

4.45

m3

1.53

m2

7.65

m2

0.23

m3

40.00

m2

Keterangan

b Bak Dalam
Bak Dalam
0.53
L1

0.8

=
=
=
=
=
=

Pjng
0.53
0.424
0.424
0.424
1.696

x
x
m2
x
x
m2

L Luar
1.7625
3.7394

+
+
m2

Lbr
0.8
Sisi
4

L2

=
=
=

Pjng
0.53
0.2809

x
x
m2

Lbr
0.53

L tot

=
=
=

L1
1.696
1.9769

+
+
m2

L2
0.2809

0.53
Luas Keseluruhan
L tot

=
=
=

L Dalam
1.9769

Pek. Septicktank

Volume Galian Tanah

1 Galian Tanah
1.8

=
=
=

Lbr
1.8
4.446

x
x
m3

Pjg
1.3

x
x

tinggi
1.9

1.9

1.3

Volume Pasangan Dinding

2 Pas. Dinding

L1
0.3

=
=
=

Pjng
0.3
1.53

x
x
m2

Lbr
5.1

5.1

Volume Bata Berongga

3 Pas. Bata Berongga

L2
1.5

=
=
=

Pjng
1.5
7.65

x
x
m2

Lbr
5.1

5.1

Volume Plat Penutup Beton

4 Pek. Plat Penutup Beton

V
1.8

=
=
=

Lbr
1.3
0.234

x
x
m3

Pjg
1.8

x
x

tinggi
0.1

0.1
1.3

XI

Pek. Finishing
a Dinding Luar

Luas Pengecatan Dinding


L1

=
=
=

Lbr
1.65
3.3

x
x
m2

Tggi
2

Ltot

=
=
=

L1
6.6
6.00

m2

L Jendela
0.6

L2

1
2
1

Tggi

1.35

0.5

2
1.65

0.5

=
1.35

L1

=
=
=

3.3
3.3
6.6

x
x
m2

Sisi
2

L2

=
=
=

0.3375
0.3375
0.675

x
x
m2

Sisi
2

2
=

1.35
2
0.675
0.3375

0.5

=
=

x
m2

0.5

L3

=
=
=

Lbr
3.15
6.3

x
x
m2

Tggi
2

Ltot

=
=
=

L3
12.6
8.26

m2

L Kusen
4.34

L4

=
=
=

Lbr
1.35
2.7

x
x
m2

Tggi
2

Ltot

=
=
=

L4
21.6
16.66

m2

L Kusen
4.34

3.15

L3

=
=
=

6.3
6.3
12.6

x
x
m2

Sisi
2

L4

=
=
=

2.7
2.7
21.6

x
x
m2

Sisi
8

+
+

L4
16.7

b Dinding Dalam
2
1.35

L Jendela
0.6

Luas Total Plesteran & Acian


=
=
=

PERHITUNGAN VOLUME WC 2 PINTU

L1
6.00
40.00

+
+
m2

L2
0.675

+
+

L3
16.66

Halaman 72 dari 113

Pekerjaan
Jumlah Unit Bangunan
No.

:
:

WC 2 Pintu
1
Unit

Sket

Perhitungan
Luas Pengecatan Kayu
L kusen dpn

150

c Pengecetan Kayu

60

Ltot

L Pintu

=
=
=

0.05
0.05
0.075

x
x
m2

1.5
1.5

=
=
=

0.075
0.075
0.15

x
x
m2

kiri & kanan


2

=
=
=

L
0.7
0.035

x
x
m2

tinggi
0.05

=
=

0.15
0.185

+
m2

0.04

=
=
=

0.06
0.06
0.09

x
x
m2

1.5
1.5

30

Luas Total Pengecetan Pintu & Kusen


0.185
=
+
0.28
=
x
=
0.55
m2

L1

50

L2

0.09
2

=
=

0.55

=
=
=

lbr
0.05
0.015

x
x
m2

=
=
=

0.015
0.015
0.03

x
x
m2

=
=
=

lbr
0.4
0.02

x
x
m2

tnggi
0.05

=
=
=

0.02
0.02
0.04

x
x
m2

Atas & bawah


2

1.36

Luas Total Pengecetan Jendela


0.03
=
0.07
=
=
0.14
=
=

0.14
0.95

Luas Total Pengecetan Jendela


1.36
=
+
=
2.31
m2

PERHITUNGAN VOLUME WC 2 PINTU

L kusen dlm

+
m2

=
=
=

0.15
0.15
0.225

x
x
m2

1.5
1.5

=
=
=

0.225
0.225
0.81

x
x
m2

Kllng
3.6

=
=
=

0.15
0.15
0.225

x
x
m2

1.5
1.5

=
=
=

0.225
0.225
0.81

x
x
m2

Kllng
3.6

Vol

Sat

2.31

m2

Keterangan

0.81

tnggi
0.3

L kusen dlm

kiri & kanan


2

+
x
m2

0.04
2

+
m2

0.81

0.95

Halaman 73 dari 113

Keterangan

PERHITUNGAN VOLUME WC 2 PINTU

Halaman 74 dari 113

Keterangan

PERHITUNGAN VOLUME WC 2 PINTU

Halaman 75 dari 113

Keterangan

PERHITUNGAN VOLUME WC 2 PINTU

Halaman 76 dari 113

Keterangan

PERHITUNGAN VOLUME WC 2 PINTU

Halaman 77 dari 113

Keterangan

PERHITUNGAN VOLUME WC 2 PINTU

Halaman 78 dari 113

Keterangan

PERHITUNGAN VOLUME WC 2 PINTU

Halaman 79 dari 113

ANALISA & RAB WC

NO RAB : 5
Pekerjaan/ Kegiatan : Sarana Sanitasi

I
A
A

II
A

III
A

URAIAN

KOEF.

VOLUME

SAT

NO

Sub Pekerjaan
Dimensi

HARGA SATUAN

PEKERJAAN PERSIAPAN
Pembersihan Lapangan
Pekerja
Pemasangan Bowplank
Kayu 5/7 Klas III
Paku Biasa 2" - 5"
Kayu Papan 3/20 Klas III
Tukang Kayu
Pekerja

PEKERJAAN TANAH PONDASI


Pekerjaan Galian Tanah
Pekerja
Pekerjaan Urugan Pasir Bawah Pondasi
Pasir Urug
Pekerja
Pekerjaan Pasangan Batu Kosong
Batu Kali / Belah
Pasir Urug
Tukang Batu
Pekerja
Pekerjaan Pasangan Pondasi Batu Gunung /Kali
Batu Kali / Belah
Semen PC
Pasir Pasang
Tukang Batu
Pekerja

0.01
0.02
0.01
0.10
0.10

11.00
0.07
0.22
0.08
1.10
1.10

0.38

2.63
1.01

m
hok

Rp

45,000

1.20
0.25

0.21
0.25
0.05

m
m
hok

Rp
Rp

85,000
45,000

1.15
0.30
0.39
0.43

0.42
0.48
0.13
0.16
0.18

m
m
m
hok
hok

Rp
Rp
Rp
Rp

100,000
85,000
65,000
45,000

1.10
150.00
0.52
0.50
0.50

1.58
1.73
236.25
0.82
0.79
0.79

m
m
kg
m
hok
hok

Rp
Rp
Rp
Rp
Rp

100,000
1,400
85,000
65,000
45,000

70.00
9.48
0.04
0.10
0.32

1.47
102.90
13.93
0.06
0.15
0.47

m2
bh
kg
m
hok
hok

Rp
Rp
Rp
Rp
Rp

500
1,400
85,000
65,000
45,000

0.50

0.93
0.46

m
hok

Rp

45,000

0.27
2.00
105.00
2.25
225.00
0.52
0.78
0.35
0.12
0.12
1.20

0.24
0.06
0.47
24.81
0.53
53.16
0.12
0.18
0.08
0.03
0.03
0.28

m
m
kg
kg
kg
kg
m
m
hok
hok
hok
hok

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,750,000
14,000
9,000
20,000
1,400
85,000
115,000
65,000
65,000
65,000
45,000

0.40
2.00
105.00
2.25
225.00
0.52
0.78
0.15
0.35
0.11
1.05
1.10

0.27
0.11
0.54
28.35
0.61
60.75
0.14
0.21
0.04
0.09
0.03
0.28
0.30

m
m
kg
kg
kg
kg
m
m
m
hok
hok
hok
hok

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,750,000
14,000
9,000
20,000
1,400
85,000
115,000
1,750,000
65,000
65,000
65,000
45,000

0.32
3.20
100.00
2.25
225.00
0.52
0.78
0.12
0.35
0.11
0.12
1.10

0.24
0.08
0.76
23.63
0.53
53.16
0.12
0.18
0.03
0.08
0.03
0.03
0.26

m
m
kg
kg
kg
kg
m
m
m
hok
hok
hok
hok

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,750,000
14,000
9,000
20,000
1,400
85,000
115,000
1,750,000
65,000
65,000
65,000
45,000

0.05

Total

Total

Total

Total

PEKERJAAN BETON
Pekerjaan Sloof
Kayu Kls. III Papan
Paku Biasa
Besi Beton Polos
Kawat Beton Polos
Semen PC
Pasir Beton
Kerikil beton
Tukang Batu
Tukang Kayu
Tukang Besi
Pekerja
Pekerjaan Kolom
Kayu Kls. III papan
Paku Biasa
Besi Beton Polos
Kawat Beton Polos
Semen PC
Pasir Beton
Kerikil beton
Kayu Kls. III Balok
Tukang Batu
Tukang Kayu
Tukang Besi
Pekerja
Pekerjaan Ring Balok
Kayu Kls. III papan
Paku Biasa
Besi Beton Polos
Kawat Beton Polos
Semen PC
Pasir Beton
Kerikil beton
Kayu Kls. III Balok
Tukang Batu
Tukang Kayu
Tukang Besi
Pekerja

Rp

45,000

m
kg
m
hok
hok

Rp
Rp
Rp
Rp
Rp

1,750,000
14,000
1,750,000
65,000
45,000

Total
Sub Total I

Pek. Pasangan Bata 1 : 2 Teras


Batu Bata
Semen PC
Pasir Pasang
Tukang batu
Pekerja
Pekerjaan Urugan Kembali Tanah Bekas Galian
Pekerja

hok

Total

Total
Sub Total II

Total

Total

Total
Sub Total III

IV
C

V
A

VI
A

VII
A

VIII
A

IX
A

PEKERJAAN PASANGAN DINDING


Pek. Pasangan Dinding 1 : 4
Batu Bata
Semen PC
Pasir Pasang
Tukang Batu
Pekerja
Plesteran Dinding 1 : 4 + Acian
Semen PC
Pasir Pasang
Tukang Batu
Pekerja

PEKERJAAN ATAP
Pekerjaan Kuda-Kuda
Kayu Kls. III (Balok)
Paku Biasa
Tukang kayu
Pekerja
Pekerjaan Rangka Seng Gelombang
Kayu Kls. III (Balok Kaso 5/7)
Kayu Kls. III (Reng 3/4)
Paku Biasa
Tukang kayu
Pekerja
Pekerjaan Pemasangan Seng Gelombang
Seng BJLS .030
Paku seng
Tukang kayu
Pekerja
PEKERJAAAN LANTAI
Pekerjaaan Urugan Tanah Bawah Lantai
Pekerja
Pekerjaan Urugan Pasir Bawah Lantai
Pasir Urug
Pekerja
Pekerjaan Lantai Beton Tumbuk
Semen PC
Pasir Beton
Kerikil beton
Tukang Batu
Pekerja
Pemasangan Tegel Keramik 20x20
Semen PC
Pasir Pasang
Tegel keramik 20 x 20
Tukang Batu
Pekerja

PEKERJAAN PLAFOND
Pekerjaan Plafond Tripleks & Rangka
Kayu Kls. III Balok
Tripleks 3 mm
Paku Biasa
Tukang kayu
Pekerja
PEKERJAAN PINTU
Pekerjaan Kosen Pintu
Kayu Kls. II (Balok)
Paku 5-7 cm
Tukang kayu
Pekerja

70.00
5.75
0.04
0.10
0.32

17.11
1,183.78
98.42
0.74
1.71
5.47

m2
bh
kg
m
hok
hok

Rp
Rp
Rp
Rp
Rp

500
1,400
85,000
65,000
45,000

10.94
0.04
0.20
0.25

29.74
325.15
1.25
5.95
7.43

m2
kg
m
hok
hok

Rp
Rp
Rp
Rp

1,400
85,000
65,000
45,000

1.10
0.80
12.00
4.00

0.12
0.13
0.10
1.43
0.48

m
m
kg
hok
hok

Rp
Rp
Rp
Rp

1,750,000
14,000
65,000
45,000

0.004
0.003
0.15
0.10
0.10

13.09
0.04
0.04
1.96
1.31
1.31

m2
m
m
kg
hok
hok

Rp
Rp
Rp
Rp
Rp

1,750,000
1,750,000
14,000
65,000
45,000

0.70
0.02
0.06
0.12

13.09
9.17
0.26
0.79
1.57

m2
lbr
kg
hok
hok

Rp
Rp
Rp
Rp

50,000
28,000
65,000
45,000

0.50

0.55
0.27

m
hok

Rp

45,000

1.20
0.25

0.18
0.22
0.05

m
m
hok

Rp
Rp

85,000
45,000

175.00
0.52
0.87
0.25
1.65

0.18
31.89
0.09
0.16
0.05
0.30

m
kg
m
m
hok
hok

Rp
Rp
Rp
Rp
Rp

1,400
85,000
115,000
65,000
45,000

8.00
0.02
25.00
0.45
0.60

3.65
29.16
0.07
91.13
1.64
2.19

kg
m
bh
hok
hok

Rp
Rp
Rp
Rp
Rp

1,400
85,000
2,680
65,000
45,000

0.02
0.38
0.03
0.40
0.27

8.66
0.15
3.25
0.26
3.47
2.34

m2
m
lbr
kg
hok
hok

Rp
Rp
Rp
Rp
Rp

1,750,000
45,000
14,000
65,000
45,000

0.06

1.10
1.25
18.00
6.00

0.06
0.07
1.00
0.33

m
kg
hok
hok

Rp
Rp
Rp
Rp

2,600,000
14,000
65,000
45,000

0.12
2.00
1.00

1.80
0.21
3.60
1.80

m2
m
hok
hok

Rp
Rp
Rp

2,600,000
65,000
45,000

1.20
1.25
18.00
6.00

0.01
0.013
0.013
0.19
0.06

m2
m
kg
hok
hok

Rp
Rp
Rp
Rp

1,750,000
14,000
65,000
45,000

1.10
0.02
0.15

0.30
0.33
0.005
0.05

m2
hok
hok

Rp
Rp
Rp

100,000
45,000
65,000

1.00
6.00
0.01
1.50
1.00

2.00
2.00
12.00
0.02
3.00
2.00

ls
bh
kg
m
hok
hok

Rp
Rp
Rp
Rp
Rp

170,000
1,400
85,000
65,000
45,000

Total

Total
Sub Total IV

Total

Total

Total
Sub Total V

Total

Total

Total

Total
Sub Total VI

Total
Sub Total VII

Total
Pekerjaan Pintu Panil
Kayu Kls. II (Papan)
Tukang kayu
Pekerja
Total
Pekerjaan Kosen Jendela
Kayu Kls. III (Balok)
Paku 5-7 cm
Tukang Kayu
Pekerja
Total
Memasang Kaca Tebal 3 mm
Kaca Polos 3 mm
Pekerja
Tukang

PEKERJAAN INSTALASI AIR


Pek. Pemasangan Kloset Jongkok
Kloset Jongkok
Semen PC
Pasir Pasang
Tukang Batu
Pekerja

Total
Sub Total VIII

Total

B
a

Pekerjaan Bak WC
Pasangan Bata 1 : 2
Batu Bata
Semen PC
Pasir Pasang
Tukang batu
Pekerja
Pemasangan Tegel Keramik 20x20
Semen PC
Pasir Pasang
Keramik 20x20
Tukang Batu
Pekerja
Pekerjaan Pemasangan Floor Drain
Floor Drain
Tukang Batu
Pekerja

X
a

XI
a

PEKERJAAAN SEPTIC TANK


Galian Tanah
Pekerja
Pas. Dinding 1 : 4
Batu Bata
Semen PC
Pasir Pasang
Tukang Batu
Pekerja
Pas. Bata Berongga
Batu Bata
Pasir Urug
Pekerja
Tukang Batu
Plat Penutup Beton
Kayu Kls. III papan
Paku Biasa
Besi Beton Polos
Kawat Beton Polos
Semen PC
Pasir Beton
Kerikil beton
Kayu Kls. III Balok
Tukang Batu
Tukang Kayu
Tukang Besi
Pekerja
PEKERJAAN FINISHING
Pengecatan Tembok
Plamur Tembok
Cat Dasar
Cat Tembok
Tukang Cat
Pekerja
Pengecatan Kayu
Cat Meni
Plamir Kayu
Tukang
Pekerja

70.00
9.48
0.04
0.10
0.32

2.40
168.00
22.74
0.09
0.24
0.77

m2
bh
kg
m
hok
hok

Rp
Rp
Rp
Rp
Rp

500
1,400
85,000
65,000
45,000

8.00
0.02
25.00
0.45
0.60

3.74
29.92
0.07
93.49
1.68
2.24

m2
kg
m
m2
hok
hok

Rp
Rp
Rp
Rp
Rp

1,400
85,000
2,680
65,000
45,000

1.00
0.10
0.01

2.00
2.00
0.20
0.02

ls
bh
hok
hok

Rp
Rp
Rp

35,000
65,000
45,000

0.38

4.45
1.71

m
hok

Rp

45,000

70.00
5.75
0.04
0.10
0.32

1.53
107.10
8.80
0.07
0.15
0.49

m2
bh
kg
m
hok
hok

Rp
Rp
Rp
Rp
Rp

500
1,400
85,000
65,000
45,000

60.00
0.04
0.25
0.20

7.65
459.00
0.33
1.91
1.53

m2
bh
m
hok
hok

Rp
Rp
Rp
Rp

500
85,000
45,000
65,000

0.32
3.20
100.00
2.25
225.00
0.52
0.78
0.12
0.35
0.11
0.12
1.10

0.23
0.07
0.75
23.40
0.53
52.65
0.12
0.18
0.03
0.08
0.03
0.03
0.26

m
m
kg
kg
kg
kg
m
m
m
hok
hok
hok
hok

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,750,000
14,000
9,000
20,000
1,400
85,000
115,000
1,750,000
65,000
65,000
65,000
45,000

0.10
0.10
0.26
0.06
0.02

40.00
4.00
4.00
10.40
2.52
0.80

m2
kg
kg
kg
hok
hok

Rp
Rp
Rp
Rp
Rp

7,600
5,000
16,000
65,000
45,000

0.20
0.15
0.01
0.07

2.31
0.46
0.35
0.02
0.16

m2
kg
kg
hok
hok

Rp
Rp
Rp
Rp

20,000
20,000
65,000
45,000

bh
bh
bh
bh

Rp
Rp
Rp
Rp

50,000
50,000
35,000
15,000

Total

Total

Total
Sub Total IX

Total

Total

Total

Total
Sub Total X

Total

Total
Sub Total XI
XII

Alat
Cangkul
Sekop
Linggis
Ember

1.00
1.00
1.00
1.00
Total
Sub Total XII
Jumlah Total

1.00
1.00
1.00
1.00
1.00

ANALISA & RAB WC

: WC 2 Pintu
: 1 Unit
BIAYA (Rp)
TOTAL
6=2x5

Rp

Rp
Rp
Rp
Rp
Rp
Rp
Rp

115,500
3,080
134,750
71,500
49,500
374,330
374,330

Rp
Rp

45,360
45,360

Rp
Rp
Rp

21,420
2,363
23,783

Rp
Rp
Rp
Rp
Rp

48,300
10,710
10,647
8,033
77,690

Rp
Rp
Rp
Rp
Rp
Rp

173,250
330,750
69,615
51,188
35,438
660,240

Rp
Rp
Rp
Rp
Rp
Rp

51,450
19,500
4,748
9,555
21,168
106,421

Rp
Rp
Rp

20,841
20,841
934,333

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

111,628
6,615
223,256
10,631
74,419
10,442
21,192
5,375
1,843
1,843
12,758
480,001

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

189,000
7,560
255,150
12,150
85,050
11,934
24,219
70,875
6,143
1,931
18,428
13,365
695,804

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

132,300
10,584
212,625
10,631
74,419
10,442
21,192
49,613
5,375
1,689
1,843
11,694
542,406
1,718,211

Rp
Rp
Rp
Rp
Rp
Rp

591,892
137,789
62,519
111,183
246,312
1,149,694

Rp
Rp
Rp
Rp
Rp
Rp

455,213
106,154
386,555
334,519
1,282,441
2,432,135

Rp
Rp
Rp
Rp
Rp

229,975
1,338
93,185
21,504
346,002

Rp
Rp
Rp
Rp
Rp
Rp

74,160
73,328
27,498
85,113
58,924
319,024

Rp
Rp
Rp
Rp
Rp
Rp

458,301
7,333
51,068
70,709
587,410
1,252,436

Rp
Rp

12,302
12,302

Rp
Rp
Rp

18,590
2,050
20,640

Rp
Rp
Rp
Rp
Rp
Rp

44,651
8,055
18,234
2,962
13,532
87,434

Rp
Rp
Rp
Rp
Rp
Rp
Rp

40,824
5,577
244,215
106,616
98,415
495,647
616,023

Rp
Rp
Rp
Rp
Rp
Rp
Rp

261,166
146,180
3,638
225,225
105,249
741,458
741,458

Rp
Rp
Rp
Rp
Rp

158,730
971
64,935
14,985
239,621

Rp
Rp
Rp
Rp

535,600
234,000
81,000
850,600

Rp
Rp
Rp
Rp
Rp

22,050
184
12,285
2,835
37,354

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp
Rp

33,000
203
2,925
36,128
1,163,703

340,000
16,800
1,700
195,000
90,000
643,500

Rp
Rp
Rp
Rp
Rp
Rp

84,000
31,836
7,752
15,600
34,560
173,748

Rp
Rp
Rp
Rp
Rp
Rp

41,881
5,721
250,540
109,377
100,964
508,484

Rp
Rp
Rp
Rp
Rp

70,000
13,000
900
83,900
1,409,632

Rp
Rp

76,827
76,827

Rp
Rp
Rp
Rp
Rp
Rp

53,550
12,317
5,592
9,945
22,032
103,436

Rp
Rp
Rp
Rp
Rp

229,500
27,961
86,063
99,450
442,973

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

131,040
10,483
210,600
10,530
73,710
10,343
20,990
49,140
5,324
1,673
1,825
11,583
537,241
1,160,476

Rp
Rp
Rp
Rp
Rp
Rp

30,396
19,998
166,379
163,780
35,996
416,548

Rp
Rp
Rp
Rp
Rp
Rp

9,240
6,930
1,351
7,277
24,798
441,346

Rp
Rp
Rp
Rp
Rp
Rp
Rp

50,000
50,000
35,000
15,000
150,000
150,000
12,394,082

RENCANA ANGGARAN BIAYA


NO RAB : 5
Pekerjaan/ Kegiatan : Sarana Sanitasi

NO

URAIAN

TOTAL

1
I

II

III

BAHAN
Batu Bata
Batu Kali / Belah
Besi Beton Polos
Cat Dasar Tembok
Cat Meni
Cat Tembok
Floor Drain
Kawat Beton Polos
Kayu Kls. II
Kayu Kls. III
Kerikil
Kloset Jongkok
Paku Biasa
Paku seng
Plamir Kayu
Plamur Tembok
Pasir
Semen PC
Seng BJLS .030
Tripleks 3 mm
Kaca Bening 3 mm
Keramik 20x20
ALAT
Cangkul
Sekop
Linggis
Ember
UPAH
Pekerja
Tukang

Rp

VOLUME
KONTRIBUSI MASYRAKAT
IN CASH
IN KIND
3
4

APBN

APBD

2,020.78
2.22
100.18
4.00
0.46
10.40
2.00
2.20
0.27
0.94
0.92
2.00
5.14
0.26
0.35
4.00
4.70
1,027.97
9.17
3.25
0.33
184.61

2,020.78
2.22
100.18
4.00
0.46
10.40
2.00
2.20
0.27
0.94
0.92
2.00
5.14
0.26
0.35
4.00
4.70
1,027.97
9.17
3.25
0.33
184.61

1.00
1.00
1.00
1.00

38.87
33.53

SATUAN

HARGA SATUAN
(Rp)

TOTAL

BIAYA (Rp)
KONTRIBUSI MASYARAKAT
IN CASH
10

bh
m
kg
kg
kg
kg
bh
kg
m
m
m
bh
kg
kg
kg
kg
m
kg
lmbr
lmbr
m2
m2

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

500
100,000
9,000
5,000
20,000
16,000
35,000
20,000
2,600,000
1,750,000
115,000
170,000
14,000
28,000
20,000
7,600
85,000
1,400
50,000
45,000
100,000
2,680
sub total I

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,010,392
221,550
901,631
19,998
9,240
166,379
70,000
43,943
694,330
1,644,525
105,826
340,000
71,952
7,333
6,930
30,396
399,275
1,439,158
458,301
146,180
33,000
494,755
8,315,092

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1.00
1.00
1.00
1.00

bh
bh
bh
bh

Rp
Rp
Rp
Rp

50,000
50,000
35,000
15,000
sub total II

Rp
Rp
Rp
Rp
Rp

50,000
50,000
35,000
15,000
150,000

Rp
Rp
Rp
Rp
Rp

38.87
33.53

hok
hok

Rp
Rp

45,000
65,000
sub total III
Jumlah total

Rp
Rp
Rp
Rp

1,749,258
2,179,733
3,928,991
12,394,082

Rp
Rp
Rp
Rp

RENCANA ANGGARAN BIAYA


Sub Pekerjaan
Dimensi

: WC 2 Pintu
: 1 Unit

BIAYA (Rp)
KONTRIBUSI MASYARAKAT
IN KIND
11

APBN

APBD

12

13

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,010,392
221,550
901,631
19,998
9,240
166,379
70,000
43,943
694,330
1,644,525
105,826
340,000
71,952
7,333
6,930
30,396
399,275
1,439,158
458,301
146,180
33,000
494,755
8,315,092

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

50,000
50,000
35,000
15,000
150,000

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

1,749,258
2,179,733
3,928,991
12,394,082

PROGRAM PAMSIMAS
(PENYEDIAAN AIR BERSIH & SARANA SANITASI BERBASIS MASYARAKAT)
RENCANA ANGGARAN BIAYA
0
No RAB
Pekerjaan/Kegiatan

No

No

: 6
: Pelatihan LKM

URAIAN
1

Teknik
A.1 ATK Pelatihan
1. Spidol Besar
3. Kertas Plano
4. Lakban Kertas

Total
2=3+4+5+6

Program
Jenis
Volume
Kontribusi Masyarakat
Incash
Inkind
3
4

Harga
APBN

APBD

Satuan
7

2
7
1

2
7
1

A.2 ATK Peserta


1. Map Plastik
2. note Book
3. Pena
4. Foto Copy Modul dan Jilid

26
26
26
17

26
26
26
17

Bh
Bh
Bh
Rangkap

A.3 Kostum
1. Baju Kaos

26

26

A.4 Konsumsi
1. Snack ringan
2. Snack Berat

29
29

29
29

URAIAN
1
Manajemen Keuangan
Dan Adm. Proyek
B.1 ATK Pelatihan
1. Spidol Besar
3. Kertas Plano
4. Lakban Kertas

Total
2=3+4+5+6

Volume
Kontribusi Masyarakat
Incash
Inkind
3
4

APBN

APBD

Bh
lembar
Bh

Satuan (Rp)

Total

9=2x8

Rp
5,000 Rp
Rp
1,000 Rp
Rp
5,000 Rp
Sub Total A.1 Rp

APBN
12=5x8

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

65,000
91,000
65,000
255,000
476,000

Bh

Rp
50,000 Rp
Sub Total A.3 Rp

1,300,000
1,300,000

Rp
Rp

Rp
Rp

Rp
Rp

Bungkus
Bungkus

Rp
3,000 Rp
Rp
11,000 Rp
Sub Total A.4 Rp
Sub Total A Rp
Harga

87,000
319,000
406,000
2,204,000

Rp
Rp
Rp

Rp
Rp
Rp

Rp
Rp
Rp

Bh
lembar
bh

Satuan (Rp)

Total

9=2x8

1
6
1

1
6
1

A.2 ATK Peserta


1. Map Plastik
2. note Book
3. Pena
4. Foto Copy Modul dan Jilid

26
26
26
17

26
26
26
17

Bh
Bh
Rangkap
Bh

Rp
2,500
Rp
3,500
Rp
2,500
Rp
15,000
Sub Total B.2

B.3 Konsumsi
1. Snack ringan
2. Snack Berat

29
29

29
29

Bungkus
Bungkus

Sub Total B

BIAYA
Kontribusi Masyarakat
Incash
Inkind
10=3x8
11=4x8

Rp
Rp
Rp
Rp
Rp

Satuan

Rp
2,500
Rp
3,500
Rp
2,500
Rp
15,000
Sub Total A.2

10,000
7,000
5,000
22,000

: PAMSIMAS
: RAB Pemberdayaan

Rp
5,000 Rp
Rp
1,000 Rp
Rp
5,000 Rp
Sub Total B.1 Rp

BIAYA
Kontribusi Masyarakat
Incash
Inkind
10=3x8
11=4x8

APBN
12=5x8

5,000
6,000
5,000
16,000

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

65,000
91,000
65,000
255,000
476,000

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
3,000 Rp
Rp
11,000 Rp
Sub Total B.3 Rp
Rp

87,000
319,000
406,000
898,000

Rp
Rp
Rp

Rp
Rp
Rp

Rp
Rp
Rp

No

URAIAN
1
Program Kesehatan
Masyarakat dan Sekolah
C.1 ATK Pelatihan
1. Spidol Besar
2. Kertas Plano
3. Lakban Kertas
C.2 ATK Peserta
1. Map Plastik
1. Note book
2. Pena
3. Foto Copy Modul dan Jilid
C.3 Konsumsi
2. Snack ringan
3. Snack Berat

Total
2=3+4+5+6

Volume
Kontribusi Masyarakat
Incash
Inkind
3
4

Harga
APBN

APBD

Satuan
7

1
6
1

1
6
1

26
26
26
17

26
26
26
17

29
29

29
29

Bh
lembar
Bh

Satuan (Rp)

Total

9=2x8

5,000
6,000
5,000
16,000

Rp
Rp
Rp
Rp

Rp

65,000
91,000
65,000
255,000
476,000

Rp
Rp
Rp
Rp
Rp

Rp
3,000 Rp
Rp
11,000 Rp
Sub Total C.3 Rp
Sub Total C Rp
Total = Sub( A + B + C ) Rp

87,000
319,000
406,000
898,000
4,000,000

Rp
Rp
Rp
Rp
Rp

Bh
Bh
Bh
Rangkap

Bungkus
Bungkus

Rp
5,000 Rp
Rp
1,000 Rp
Rp
5,000 Rp
Sub Total C.1 Rp

BIAYA
Kontribusi Masyarakat
Incash
Inkind
10=3x8
11=4x8

Rp
2,500
Rp
3,500
Rp
2,500
Rp
15,000
Sub TotalC.2

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

APBN
12=5x8

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Boalemo,
Disetujui Oleh

Juni 2010

Dibuat Oleh

Ketua DPMU

Koordinator LKM

CF Pemberdayaan

Hendra Ali, ST

Abdullah Said, S.Sos

Satlak Pamsimas

PROGRAM PAMSIMAS
(PENYEDIAN AIR MINUM & SANITASI BERBASIS MASYARAKAT)
RENCANA ANGGARAN BIAYA

0
No RAB
Pekerjaan/Kegiatan

No

: 7
: Pelatihan BPS

URAIAN

Total

1
Teknik Pemeliharaan
dan Operasional
A.1 ATK Pelatihan
1. Spidol Besar
2. Kertas HVS
3. Kertas Plano
4. Lakban Kertas
5. Stapler
6. Isi Stapler
7. Penggaris 1 Meter
8. Spidol Kecil
9. Cutter
10. Busur
11. Kalkulator
12. Spanduk

2=3+4+5+6

6
1
2
2
1
2
1
6
1
13
1
1

A.2 ATK Peserta


1. Map Plastik
2. Buku
3. Pena
4. Foto Copy Modul dan Jilid
A.3 Kostum
1. Baju Kaos
2. Topi
A.4 Konsumsi
1. Aqua
2. Snack ringan
3. Snack Berat

No

Manajemen Keuangan
Dan Adm. BPS
B.1 ATK Pelatihan
1. Spidol Besar
2. Kertas Plano
3. Kertas HVS
4. Kertas Warna warni
5. Lakban Kertas
6. Isi Stapler
7. Spidol Kecil

APBD

Satuan

6
1
2
2
1
2
1
6
1
13
1
1

16
16
16
16

8
8

8
8

2=3+4+5+6

6
2
1
12
1
2
6

Volume
Kontribusi Masyarakat
Incash
Inkind
3
4

: PAMSIMAS
: RAB Pemberdayaan
: Paket
BIAYA
Kontribusi Masyarakat
Incash
Inkind
10=3x8
11=4x8

Harga
APBN

Total
1

Volume
Kontribusi Masyarakat
Incash
Inkind
3
4

16
16
16
16

1
23
23

URAIAN

Program
Jenis
Ukuran

APBN

1
23
23

Satuan (Rp)

Total

9=2x8

Bh
Rim
Kg
Bh
Bh
Kotak
Bh
Bh
Bh
Bh
Bh
Ls

Rp
5,000
Rp
35,000
Rp
17,500
Rp
5,000
Rp
17,500
Rp
2,500
Rp
15,000
Rp
1,400
Rp
7,700
Rp
3,500
Rp
85,000
Rp
300,000
Sub Total A.1

Bh
Bh
Bh
Rangkap

Bh
Bh

Dos
Bungkus
Bungkus

Satuan

APBD
5

6
2
1
12
1
2
6

30,000
35,000
35,000
10,000
17,500
5,000
15,000
8,400
7,700
45,500
85,000
300,000
594,100

Rp
Rp
Rp
Rp
Rp

72,000
56,000
40,000
240,000
408,000

Rp
50,000 Rp
Rp
15,000 Rp
Sub Total A.3 Rp

400,000
120,000
520,000

Rp
4,500
Rp
3,500
Rp
2,500
Rp
15,000
Sub Total A.2

Rp
25,000
Rp
5,000
Rp
12,000
Sub Total A.4
Sub Total A
Harga
Satuan (Rp)

Bh
Kg
Rim
Lbr
Bh
Kotak
Bh

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

25,000
115,000
276,000
416,000
1,938,100

Rp

5,000
17,500
35,000
1,500
5,000
2,500
1,400

Rp

Rp

Rp

0
0
0
0
0
0
0
0
0
0
0
0
-

Rp
Rp
Rp
Rp
Rp

Rp

Rp

Rp

9=2x8

30,000
35,000
35,000
18,000
5,000
5,000
8,400

Rp
Rp
Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp
Rp
Rp

Rp

Rp
Rp
Rp
Rp
Rp

0
0
0

Rp

BIAYA
Kontribusi Masyarakat
Incash
Inkind
10=3x8
11=4x8

Total
8

Rp
Rp
Rp
Rp
Rp

APBN
12=5x8

APBN
12=5x8

Rp
Rp
Rp
Rp
Rp
Rp
Rp

8. Lem Hakol Besar

Bh

12,000
Sub Total B.1

Rp

24,000
160,400

Rp
Rp

Rp
Rp

Rp
Rp

B.2 ATK Peserta


1. Buku
2. Pena
3. Foto Copy Modul dan jilid
4. Buku album besar

16
16
16
16

B.3 Konsumsi
1. Aqua
2. Snack ringan
3. Snack Berat

1
23
23

16
16
16
16

Bh
Bh
Rangkap
Bh

Rp
3,500
Rp
2,500
Rp
15,000
Rp
15,000
Sub Total B.2

Rp
Rp
Rp
Rp
Rp

56,000
40,000
240,000
240,000
576,000

1
23
23

Dos
Bungkus
Bungkus

Rp
25,000 Rp
Rp
5,000 Rp
Rp
12,000 Rp
Sub Total B.3 Rp
Rp

25,000
115,000
276,000
416,000
1,152,400

Sub Total B

No

URAIAN
1
Program Kesehatan
Lingkungan
C.1 ATK Pelatihan
1. Spidol Besar
2. Kertas Plano
3. Lakban Kertas
4. Isi Stapler
5. Spidol Kecil

Total
2=3+4+5+6

Volume
Kontribusi Masyarakat
Incash
Inkind
3
4

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Harga
APBN

APBD

Satuan

Satuan (Rp)

Total

9=2x8

Bh
Kg
Bh
Kotak
Bh

Rp
5,000
Rp
17,500
Rp
5,000
Rp
2,500
Rp
1,500
Sub Total C.1

Rp
Rp
Rp
Rp
Rp
Rp

30,000
52,500
5,000
5,000
9,000
101,500

Rp
3,500
Rp
2,500
Rp
15,000
Rp
3,500
Sub TotalC.2

Rp
Rp
Rp
Rp
Rp

56,000
40,000
240,000
56,000
392,000

Rp
25,000
Rp
5,000
Rp
12,000
Sub Total C.3
Sub Total C
Total = Sub( A + B + C )
Dibulatkan

Rp
Rp
Rp
Rp
Rp
Rp
Rp

25,000
115,000
276,000
416,000
909,500
4,000,000
4,000,000

6
3
1
2
6

6
3
1
2
6

C.2 ATK Peserta


1. Buku
2. Pena
3. Foto Copy Modul dan Jilid
4. Penggaris 30 cm

16
16
16
16

16
16
16
16

Bh
Bh
Rangkap
Bh

C.3 Konsumsi
1. Aqua
2. Snack ringan
3. Snack Berat

1
23
23

1
23
23

Dos
Bungkus
Bungkus

BIAYA
Kontribusi Masyarakat
Incash
Inkind
10=3x8
11=4x8

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

APBN
12=5x8

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Boalemo,

Disetujui Oleh

Juni 2010

Dibuat Oleh

Ketua DPMU

Koordinator LKM

CF Pemberdayaan

Hendra Ali, ST

Abdullah Said, S.Sos

Satlak Pamsimas

PROGRAM PAMSIMAS
ERSIH & SARANA SANITASI BERBASIS MASYARAKAT)
RENCANA ANGGARAN BIAYA
0

BIAYA
APBD
13=6x8

Rp
Rp
Rp
Rp

10,000
7,000
5,000
22,000.00

Rp
Rp
Rp
Rp
Rp

65,000
91,000
65,000
255,000
476,000

Rp
Rp

1,300,000
1,300,000.00

Rp
Rp
Rp
Rp

87,000
319,000
406,000.00
2,204,000

BIAYA
APBD
13=6x8

Rp
Rp
Rp
Rp

5,000
6,000
5,000
16,000

Rp
Rp
Rp
Rp
Rp

65,000
91,000
65,000
255,000
476,000

Rp
Rp
Rp
Rp

87,000
319,000
406,000
898,000

BIAYA
APBD
13=6x8

Rp
Rp
Rp
Rp

5,000
6,000
5,000
16,000

Rp
Rp
Rp
Rp

65000
91,000
65,000
255,000
476,000

Rp
Rp
Rp
Rp
Rp
Boalemo,

87,000
319,000
406,000
898,000
4,000,000

Juni 2010

Dibuat Oleh
Satlak Pamsimas

PROGRAM PAMSIMAS
AIR MINUM & SANITASI BERBASIS MASYARAKAT)
RENCANA ANGGARAN BIAYA

BIAYA
APBD
13=6x8

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

30,000
35,000
35,000
10,000
17,500
5,000
15,000
8,400
7,700
45,500
85,000
300,000
594,100.00

Rp
Rp
Rp
Rp
Rp

72,000
56,000
40,000
240,000
408,000

Rp
Rp
Rp

400,000
120,000
520,000.00

Rp
Rp
Rp
Rp
Rp

25,000
115,000
276,000
416,000.00
1,938,100

BIAYA
APBD
13=6x8

30,000
35,000
35,000
18,000
5,000
5,000
8,400

Rp

24,000
160,400

Rp
Rp
Rp
Rp
Rp

56,000
40,000
240,000
240,000
576,000

Rp
Rp
Rp
Rp
Rp

25,000
115,000
276,000
416,000
1,152,400

BIAYA
APBD
13=6x8

Boalemo,

Rp
Rp
Rp
Rp
Rp
Rp

30,000
52,500
5,000
5,000
9,000
101,500

Rp
Rp
Rp
Rp
Rp

56,000
40,000
240,000
56,000
392,000

Rp
Rp
Rp
Rp
Rp
Rp
Rp

25,000
115,000
276,000
416,000
909,500
4,000,000
5,000,000

Juni 2010

Dibuat Oleh
Satlak Pamsimas

RENCANA ANGGARAN BIAYA


RENCANA ANGGARAN BIAYA OPERASIONAL LKM
0
NO RAB
: 8
Pekerjaan/ Kegiatan

NO

URAIAN
1

A
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
B

ATK LKM
Kalkulator
Map
Amplop
Kertas A.4
Kertas Folio
Kertas Sampul
Buku Agenda / Block Note
Materai 6000
Pena
Pensil 2B
Peraut Pensil
Penghapus
Penggaris
Stappler
Isi stapler
Spidol Besar
spidol Kecil
Lakban Kertas
Kertas Plano
Buku Tulis Album
Karton
Map Plastik
Tip X
Tinta Printer HP
Stabilo
Lak Ban Hitam

DOKUMENTASI
1 Rol Film 36
2 Cuci Cetak

Konstribusi Masyarakat
Total

InCash

2=3+4+5+6

APBN

InKind

Satuan

APBD

1.00
7.00
3.00
2.00
1.00
15.00
2.00
10.00
12.00
2.00
1.00
1.00
1.00
1.00
3.00
12.00
12.00
6.00
2.00
5.00
12.00
12.00
2.00
2.00
6.00
5.00

1.00
7.00
3.00
2.00
1.00
15.00
2.00
10.00
12.00
2.00
1.00
1.00
1.00
1.00
3.00
12.00
12.00
6.00
2.00
5.00
12.00
12.00
2.00
2.00
6.00
5.00

Bh
Bh
Dos
Rim
Rim
Lbr
Bh
Lbr
Bh
Bh
Bh
Bh
Bh
Bh
Dos
Bh
Bh
Rol
Kg
Bh
Lbr
Bh
Bh
Bh
Bh
Rol

5.00
5.00

5.00
5.00

Rol
Ls

Biaya (Rp)
Kontribusi

Harga Satuan
(Rp)
7

Total

8
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

85,000
1,000
13,500
35,000
35,000
1,500
3,500
7,500
2,500
2,500
1,500
1,500
3,500
17,500
2,500
5,000
1,400
9,000
20,000
12,500
1,500
4,500
3,500
35,000
6,500
12,500
Sub Total A

InCash

9=2x8

10=3x8

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

85,000
7,000
40,500
70,000
35,000
22,500
7,000
75,000
30,000
5,000
1,500
1,500
3,500
17,500
7,500
60,000
16,800
54,000
40,000
62,500
18,000
54,000
7,000
70,000
39,000
62,500
892,300.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

25,000.00 Rp
60,000.00 Rp
Sub Total B Rp

125,000
300,000
425,000

Rp
Rp
Rp

C
1
2
3
4
5
6
7
8
9
10
11
D
1
2
3
4

ADMINISTRASI LKM
Pembuatan Cap LKM
Bantalan Cap LKM
Isi Tinta Bantalan Cap
Pembuatan Papan Informasi
Pembuatan Papan Nama Proyek
Pembuatan Papan Sekretariat
Foto Copy Dokumen
Pembolong Kertas
Pembelian Cat @ 5 kg
Foto Copy Pembukuan
Map Snelhekter
TRANSPORTASI LKM
Perjalanan LKM Survey Harga di ibu Kota Propinsi ( 2 Org)
Perjalanan LKM ke Kabupaten (2 org)
Perjalanan LKM ke Bank (2 Org)
Perjalanan LKM ke Toko (2 Org)

1.00
1.00
3.00
1.00
1.00
1.00
1,100.00
1.00
2.00
929.00
12.00

1.00
1.00
3.00
1.00
1.00
1.00
1,100.00
1.00
2.00
929.00
12.00

Bh
Bh
Bh
Bh
Bh
Bh
Lbr
Bh
Bh
Lbr
Bh

60,000.00
7,500.00
10,000.00
150,000.00
150,000.00
150,000.00
200.00
12,500.00
47,500.00
200.00
3,500.00
Sub Total C

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

60,000
7,500
30,000
150,000
150,000
150,000
220,000
12,500
95,000
185,800
42,000
1,102,800

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

5.00
14.00
24.00
33.00

5.00
14.00
24.00
33.00

Org
Org
Org
Org

80,000.00
80,000.00
80,000.00
80,000.00
Sub Total D
Total

Rp
Rp
Rp
Rp
Rp
Rp
Dibulatkan Rp

400,000
1,120,000
1,920,000
2,640,000
6,080,000
8,500,100
8,500,000

Rp
Rp
Rp
Rp
Rp
Rp

Rp

Boalemo,

Juni 20

Dibuat Oleh

Di setujui
Ketua DPMU

Koordinator LKM

CF Pemberdayaan

Satlak Pamsimas

Husain Van Gobel

Abdullah Said, S.Sos

CANA ANGGARAN BIAYA


GARAN BIAYA OPERASIONAL LKM
0
Dimensi
: 1 Kegiatan : Biaya Operasional LKM
Sub Pekerjaan/
Paket
Biaya (Rp)
Kontribusi
Inkind
11=4x8
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp

Rp
Rp
Rp

APBN

APBD

12=5x8

13=6x8

85,000
7,000
40,500
70,000
35,000
22,500
7,000
75,000
30,000
5,000
1,500
1,500
3,500
17,500
7,500
60,000
16,800
54,000
40,000
62,500
18,000
54,000
7,000
70,000
39,000
62,500
892,300.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

125,000
300,000
425,000

Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

60,000
7,500
30,000
150,000
150,000
150,000
220,000
12,500
95,000
185,800
42,000
1,102,800

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Juni

400,000
1,120,000
1,920,000
2,640,000
6,080,000
8,500,100
8,500,000
2010

Rp
Rp
Rp
Rp
Rp
Rp

Rp

Rp

Boalemo,
Dibuat Oleh

Satlak Pamsimas

RENCANA PENGGUNAAN DANA TERMIN I (APBD)

Kegiatan : Sarana Sanitasi Sekolah


VOLUME
NO

URAIAN

Jamban Sekolah

APBN

Bahan
Batu Bata
Batu Kali / Belah
Besi Beton Polos
Cat Dasar Tembok
Cat Meni
Cat Tembok
Floor Drain
Kawat Beton Polos
Kayu Kls. II
Kayu Kls. III
Kerikil
Kloset Jongkok
Paku Biasa
Paku seng
Plamir Kayu
Plamur Tembok
Pasir
Semen PC
Seng BJLS .030
Tripleks 3 mm
Kaca Bening 3 mm
Keramik 20x20

KEBUTUHA
Real. s/d
N
Tahap Lalu

Pengajuan
Sekarang

2,020.78
2.22
100.18
4.00
0.46
10.40
2.00
2.20
0.27
0.94
0.92
2.00
5.14
0.26
0.35
4.00
4.70
1,027.97
9.17
3.25
0.33
184.61

Jumlah
Kumulatif

2,020.78
2.22
100.18
4.00
0.46
10.40
2.00
2.20
0.27
0.94
0.92
2.00
5.14
0.26
0.35
4.00
4.70
1,027.97
9.17
3.25
0.33
184.61

2,020.78
2.22
100.18
4.00
0.46
10.40
2.00
2.20
0.27
0.94
0.92
2.00
5.14
0.26
0.35
4.00
4.70
1,027.97
9.17
3.25
0.33
184.61

1.00
1.00
1.00
1.00

1.00
1.00
1.00
1.00

Unit / Sat.

bh
m
kg
kg
kg
kg
bh
kg
m
m
m
bh
kg
kg
kg
kg
m
kg
lmbr
lmbr
m2
m2

Sub Total I
b

Alat
Cangkul
Sekop
Linggis
Ember
Upah
Pekerja
Tukang

1.00
1.00
1.00
1.00

38.87
33.53

Sub Total II
-

38.87
33.53

Sub Total III


Total Dana APBN + In-Cash

38.87
33.53

bh
bh
bh
bh

Hok
Hok

MIN I (APBD)

RPD Ke : 2

Harga Satuan (Rp)

Jumlah (Rp)

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

500
100,000
9,000
5,000
20,000
16,000
35,000
20,000
2,600,000
1,750,000
115,000
170,000
14,000
28,000
20,000
7,600
85,000
1,400
50,000
45,000
100,000
2,680

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,010,392
221,550
901,631
19,998
9,240
166,379
70,000
43,943
694,330
1,644,525
105,826
340,000
71,952
7,333
6,930
30,396
399,275
1,439,158
458,301
146,180
33,000
494,755
8,315,091.68

Rp
Rp
Rp
Rp

50,000.00
50,000.00
35,000.00
15,000.00

Rp
Rp
Rp
Rp
Rp

50,000.00
50,000.00
35,000.00
15,000.00
150,000.00

Rp
Rp

45,000.00
65,000.00

Rp
Rp
Rp
Rp

1,749,257.83
2,179,732.74
3,928,990.57
12,394,100.00

DAFTAR RENCANA PENGADAAN BARANG DAN JASA

NO
1

PAKET PEKERJAAN

URAIAN MATERIAL

Paket
1
Pengadaan
Pipa dan Assesoris

VULUME

PIPA DAN ASSESORIES: TRANSMISI DAN DISTIBUSI


Pipa PVC SNI 1,5"
1,517
Pipa PVC SNI 1 1/4"
840
Pipa PVC SNI 1"
420
Asesoris
Pipa Gip 1
12
Knee 1 "
4
T Sock 1 "
4
Knee PVC 1 " (90)
5
Knee PVC 1 " (90)
6
Knee PVC " (90)
7
Knee PVC 1" (45)
4
Oversock PVC 1"x 1 "
3
Oversock PVC 1"x 1 "
4
Oversock PVC 1"x "
6
Oversock PVC "x "
6
T Sock PVC 1 "
4
T Sock PVC 1 "
5
T Sock PVC 1 "
5
Knee PVC 1 " (90)
6
Knee GIP 1 " (90)
6
Knee GIP 1 " (90)
4
Knee GIP 1 " (90)
4
Sock Pipa PVC 1"
3
Sock Pipa PVC 1"
3
Sock Pipa PVC 1"
3
Sock Pipa GIP 1"
3
Sock Pipa GIP 1"
3
Sock Pipa GIP 1"
3
Lem Pipa @ 5 kg
1
TBA
5
DOP Pipa PVC 1"
3
PIPA DAN ASSESORIES: HIDRAN UMUM
Pipa Gip 1/2
12
Pipa Gip 3/4
9
Kran 1/2
36
Seal Tape
2.43
Stop Kran
9.0
Knee 1/2"
18.0
T 3/4"
18.0
Sok Drat Luar 3/4"
1.0
Sok Drat Dalam 1/2"
1.0
Over Sok 3/4" x 1/2"
1.0
Pelampung Otomat
1.0
Lem
1.0
PIPA DAN ASSESORIES: BOR DALAM
Pipa PVC SNI S.12,5 4 inch (Casshing)
50
Pipa PVC SNI S.12,5 1inch (Penghisap)
50
Pipa PVC SNI S.12,5 1 inch (Penghisap)
50
Pipa Gip 1,5 "
12
Knee pipa PVC 1" inch
5
PIPA DAN ASSESORIES: WASTAFEL DAN WC SEKOLAH
Pipa PVC Dia. 3/4
31
TOTAL NILAI PEMAKETAN PIPA DAN ASSESORIES

SATUAN

M
M
M

HARGA
SATUAN
(RP)
17,500
15,000
9,000

M"
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
Kaleng
Roll
buah

35,000
14,025
14,025
11,739
11,739
9,452
11,739
11,739
11,739
11,739
10,214
11,739
11,739
9,452
9,452
20,866
24,698
17,602
14,025
11,739
11,739
24,698
20,866
17,602
325,000
8,000
11,739

ujung
ujung
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Kaleng

94,000
105,000
25,000
4,000
60,000
3,500
3,500
4,000
4,000
3,600
100,000
35,000

M'
M'
M'
M'
M'

72,000
16,750
9,000
35,000
3,500

8,750

NO

PAKET PEKERJAAN
Paket
Pengadaan

URAIAN MATERIAL
1

VULUME

SATUAN

HARGA
SATUAN
(RP)

SEMEN DAN BESI : HIDRAN UMUM

2
Semen dan Besi

NO

PAKET PEKERJAAN

Paket
Pengadaan Jasa

URAIAN MATERIAL

Pengeboran
Bor Dalam (40M)

PAKET PEKERJAAN
Paket
Pengadaan Jasa

NO

URAIAN MATERIAL

kg
Kg
Kg
Lbr
kg
lbr
Buah
Buah
Kg
Kg
Kg
Kg
Kg
Kg
Kg
kg
lmbr
lmbr
m2
m2

SATUAN

9,000
9,000
1,300
2,600
2,500
20,000
1,300
9,000
14,000
50,000
28,000
50,000
100,000
10,000
20,000
9,000
20,000
1,300
1,300
9,000
20,000
1,400
50,000
45,000
100,000
2,680

HARGA
SATUAN
(RP)

40

VULUME

SATUAN

250,000
HARGA
SATUAN
(RP)

1
Besi Siku dan Jasa Pekerjaannya

Pembuatan
Menara dan Besi
Siku

Besi Siku 70.70.5


Besi Siku 50.50.3
Besi Siku 30.30.3
Jasa Pekerjaan Menara

PAKET PEKERJAAN
Paket
Pengadaan
Bahan
Buis Beton

VULUME

Kg
Kg
kg
Bh
Kg
Kg

Bor Dalam

NO

Besi Beton Polos


1138.05
Paku Biasa
17.334
Semen PC
9483.03
Ubin Warna
864
Semen Warna
65
Kawat Beton (Bendrat)
17.07075
SEMEN DAN BESI : MENARA AIR MINUM
Semen PC
178.2
Beton Polos
79.2
Paku Biasa
1.824
Seng BJLS .030
6.30
Paku seng
0.18
Seng Plat BJLS 30 Kl
2.00
Plat Besi Tebal = 5 cm (50x50)
4.00
Angker Bout 20 cm ( tinggi 15 cm)
16.00
Kawat Beton
1.782
SEMEN DAN BESI : SUMUR GALI
Besi Beton
107.625
Kawat Beton (Bendrat)
2.53125
Semen
2114.9216625
SEMEN DAN BESI : WASTAFEL DAN WC SEKOLAH
Semen PC
12
Besi Beton Polos
100.18125
Kawat Beton Polos
2.197125
Semen PC
1,027.97
Seng BJLS .030
9.17
Tripleks 3 mm
3.25
Kaca Bening 3 mm
0.33
Keramik 20x20
184.61
TOTAL NILAI PEMAKETAN SEMEN DAN BESI

URAIAN MATERIAL

4
Ujung
16 Ujung
25 Ujung
1 Buah

VULUME

SATUAN

400,000
300,000
200,000
5,000,000

HARGA
SATUAN
(RP)

1
Buis Beton: Sumur Gali
Buis Beton

30

bh

350,000

DAN JASA

JUMLAH BIAYA

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

WAKTU
METODE
PENGADAAN PELAKSA
NAAN

26,540,850.00 PELELANGAN TERMIN I


12,600,000.00
3,780,000.00
420,000.00
56,100.00
56,100.00
58,695.00
70,434.00
66,164.00
46,956.00
35,217.00
46,956.00
70,434.00
61,284.00
46,956.00
58,695.00
47,260.00
56,712.00
125,196.00
98,792.00
70,408.00
42,075.00
35,217.00
35,217.00
74,094.00
62,598.00
52,806.00
325,000.00
40,000.00
35,217.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,128,000.00
945,000.00
900,000.00
9,720.00
540,000.00
63,000.00
63,000.00
4,000.00
4,000.00
3,600.00
100,000.00
35,000.00

Rp
Rp
Rp
Rp
Rp

3,600,000.00
837,500.00
450,000.00
420,000.00
17,500.00

Rp
Rp

269,500.00
54,505,253.00

JUMLAH BIAYA

Rp
Rp
Rp
Rp
Rp
Rp

SURVEY
PERBANDING
AN
10,242,450.00
TERMIN I
156,006.00
HARGA
12,327,939.00
2,246,400.00
162,000.00
341,415.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

231,660.00
712,800.00
25,536.00
315,000.00
5,040.00
100,000.00
400,000.00
160,000.00
35,640.00

Rp
Rp
Rp

968,625.00
50,625.00
2,749,398.16

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

15,600.00
901,631.25
43,942.50
1,439,157.84
458,300.64
146,179.69
33,000.00
494,754.80
34,763,100.88

JUMLAH BIAYA

Rp

WAKTU
METODE
PENGADAAN PELAKSA
NAAN

1,600,000.00 PELELANGAN TERMIN I


4,800,000.00
5,000,000.00
5,000,000.00
16,400,000.00

JUMLAH BIAYA

Rp

WAKTU
METODE
PENGADAAN PELAKSA
NAAN

10,000,000.00 PELELANGAN TERMIN I

JUMLAH BIAYA

Rp
Rp
Rp
Rp
Rp

WAKTU
METODE
PENGADAAN PELAKSA
NAAN

WAKTU
METODE
PENGADAAN PELAKSA
NAAN

10,500,000.00 PELELANGAN TERMIN I

RENCANA
Desa
Kecamatan
Jenis Pekerjaan

No

: Sarana Air Minum, SAN, Kesehatan, Pemberdayaan

URAIAN

Volume

Satuan

Bobot
(%)

Kegiatan Tahap I (APBN + IN-CASH)

Pek. Sumur Gali (3 Unit)

30,072,500.00

Rp

13.02

Promkes Masyarakat

2,068,500.00

Rp

0.90

3
II

Pekerjaan Hidran Umum ( 1 Unit)


Kegiatan Tahap II (APBN+IN-CASH)

6,145,900.00

Rp

2.66

Pekerjaan Sumur Bor Dalam ( 1 Unit )

26,827,000.00

Rp

11.61

Pekerjaan Menara (1 Unit)

24,769,300.00

Rp

10.72

3
III

Pekerjaan Jaringan Pipa 2.700 M


Kegiatan Tahap III (APBN+ INCASH)

56,530,800.00

Rp

24.47

Pekerjaan Hidran Umum ( 9 Unit)

49,166,900.00

Rp

21.28

Pekerjaan Rumah Pompa

135,300.00

Rp

0.06

Promkes Masyarakat dan Sekolah

3,283,800.00

Rp

1.42

Pelatihan BPS

4,500,000.00

Rp

1.95

IV

Kegiatan Tahap IV (APBD)

Sarana Sanitasi (Wastafel)

2,106,000.00

Rp

0.91

Sarana Sanitasi (WC Sekolah)

12,394,000.00

Rp

5.37

Pelatihan LKM

4,500,000.00

Rp

1.95

BOP LKM

8,500,000.00

Rp

3.68

Jumlah
Rencana Kemajuan Pek. Mingguan
Kumulatif Rencana Kemajuan Pek.Mingguan
Realisasi Kemajuan Pek. Mingguan
Kumulatif Realisasi Kemajuan Pek.Mingguan

231,000,000.00

100.00
-

RENCANA KERJA PELAKSANAAN ( APBN + IN-CASH)

JADWAL WAKTU PELAKSANAAN


November

Oktober
I

II
6.51

III

IV

II

III

IV

6.51
0.448

0.448

2.66
5.81

5.81
10.72

12.24

12.24
3.55

3.55

3.55

0.47

0.47

0.06

0.91
2.68

2.68

0.33

0.33

0.33

0.33

0.33

0.33

0.33

13.55
22.00

3.46
25.47

18.38
43.85

29.10
72.95

3.94
76.89

4.36
81.24

4.36
85.60

1.95

8.46
8.46

Desember
I

II

Ket.

III

IV
100

3.55

3.55

3.55

50

0.47
1.95
-

0.33

0.33

0.33

0.33
0

4.36
89.95

3.88
93.84

5.83
99.67

0.33
100.00

27,785,000
15,158,800
90,772,200
7,339,900
141,055,900

Anda mungkin juga menyukai