INPUT DATA
DATA UMUM
1 Desa : Sumberagung
2 Kecamatan : Ngantang
3 Kabupaten : Malang
4 Propinsi : Jawa Timur
5 PDP Master
6 PDTI Master
7 Tim Penyusun RKP Desa Master
8 Kepala Desa Master
9 NIP
Desa : Sumberagung
Kecamatan : Ngantang
Kabupaten : Malang
Nama Kegiatan : Saluran Drainase
Harga Satuan
No. Material / Alat / Tenaga Satuan
Harga Spare
Harga Survey PPN PPh 21 PPh 22
Survey (3-5 %)
1 Batu Belah 15/20 M3 82,000 2,460 84,500 1,268
2 Pasir Urug M3 72,000 2,160 74,200 1,113
3 Sirtu M3 77,000 2,310 79,300 1,190
4 Tanah Urug M3 55,000 1,650 56,700 851
5 Pasir Pasang M3 82,000 2,460 84,500 1,268
6 Batu Pecah 2/3 M3 135,000 4,050 139,100 13,910 2,087
7 Semen - 40 KG Zak 55,000 1,650 56,700 5,670 851
8 Semen - 50 KG Zak 53,000 1,590 54,600 5,460 819
9 Buis Beton, dia. 20 Buah 25,000 750 25,800 2,580 387
10 Buis Beton, dia. 30 Buah 40,000 1,200 41,200 4,120 618
11 Buis Beton, dia. 40 Buah 45,000 1,350 46,400 4,640 696
12 Buis Beton, dia. 50 Buah 65,000 1,950 67,000 6,700 1,005
13 Buis Beton, dia. 60 Buah 77,500 2,325 79,800 7,980 1,197
14 Besi, dia. 8 Batang 32,000 960 33,000 3,300 495
15 Besi, dia. 10 Batang 42,000 1,260 43,300 4,330 650
16 Besi, dia. 12 Batang 80,000 2,400 82,400 8,240 1,236
17 Papan begesting 2/20-2 m Lembar 12,000 360 12,400 1,240 186
18 Bambu Batang 10,000 300 10,300 1,030 155
19 Kawat bendrat Kg 15,000 450 15,500 1,550 233
20 Paku usuk Kg 15,000 450 15,500 1,550 233
21 Papan Proyek Unit 200,000 200,000
22 Prasasti Unit 500,000 500,000
Harga Satuan
PPh 23 HPS
85,800
75,400
80,500
57,600
85,800
155,100
63,300
60,900
28,800
46,000
51,800
74,800
89,000
36,800
48,300
91,900
13,900
11,500
17,300
17,300
200,000
500,000
91,900
14,400
11,500
46,000
34,500
46,000
34,500
97,700
28,800
17,300
17,300
8,600
402,000
9,000 504,000
40,000 2,240,000
3,500 196,000
10,000 560,000
60,000
80,000
90,000
41,400
11,500
5,800
4,100
8,600
4,100
3,500
14,400
17,300
2,900
27,600
200
-
10,000
20,000
26,800
-
315,000
315,000
Program Pembangunan dan Pemberdayaan Masyarakat Desa
TAKE OF SHEET
Desa : Sumberagung
Kecamatan : Ngantang
Kabupaten : Malang
Sub Kegiatan : Drainase Lantai Rabat
A 0,35 0,30
a
0,50
H1
I E
d
D
H2 0,20
b e II
c c B 0,35
B
A A
H1 H1
e
D D
H2
H2 E E
B B
94.0
- 113.0
Dimensi Lebar
Volume
Plestera
n Jarak Plesteran &
A H1 Acian
2*(A+d)
- 300.00
Pekerjaan Rabat
Dimensi Luas
Luas Luas Jarak Volume
D E
(d * e)
0.10 0.30 0.03 200.00 6
6.0
0,20
Panjang Volume
Komulatif Komulatif
Panjang Volume
Komulatif Komulatif
- -
b e
c c
Panjang Volume
Komulatif Komulatif
- - A
H1
D
H2 E
Control
Volume Volume
A
Plesteran Strikan
- -
H1
B
Plesteran dan Acian
Control
Panjang Volume
Komulatif Komulatif
- -
Program Pembangunan dan Pemberdayaan Masyarakat Desa
Jumlah Jumlah
Volume
Kategori Harga Biaya Biaya
Uraian Satuan Biaya Satuan Konstruksi Konstruksi
Dana
Total Swadaya (Swadaya) (Dana Desa)
Desa Rp.
Rp. Rp.
BAHAN
A. Bahan Konstruksi (Belanja Modal) 0 85,386,000
1 Pasir Pasang 71.0 0.0 71.0 m3 I-a 85,800 0 6,091,800
2 Portland Cement (PC)-40 kg 1,015.0 0.0 1,015.0 Zak I-b 63,300 0 64,249,500
3 Batu Pecah 2/3 97.0 0.0 97.0 m3 I-b 155,100 0 15,044,700
B. Bahan Pelengkap (Belanja Barang) 0 700,000
1 Papan Nama Kegiatan 1.0 0.0 1.0 Ls I-a 200,000 0 200,000
2 Prasasti 1.0 0.0 1.0 Ls I-a 500,000 0 500,000
Sub Total 1) 0 86,086,000
PERALATAN
A. Beli Alat Kerja (Belanja Modal) 0 77,700
1 Roll meter-50 M 0.0 0.0 0.0 Buah II-a 91,900 0 0
2 Meteran-5 M 0.0 0.0 0.0 Buah II-a 14,400 0 0
3 Benang 0.0 0.0 0.0 Roll II-a 11,500 0 0
4 Linggis 0.0 0.0 0.0 Buah II-a 46,000 0 0
5 Ganco 0.0 0.0 0.0 Buah II-a 34,500 0 0
6 Cangkul 0.0 0.0 0.0 Buah II-a 46,000 0 0
7 Sekop 0.0 0.0 0.0 Buah II-a 34,500 0 0
8 Amer - 5 Kg 0.0 0.0 0.0 Buah II-a 97,700 0 0
9 Palu - 2 Kg 0.0 0.0 0.0 Buah II-a 28,800 0 0
10 Cetok 2.0 0.0 2.0 Buah II-a 17,300 0 34,600
11 Ondrong 1.0 0.0 1.0 Buah II-a 17,300 0 17,300
12 Ember 3.0 0.0 3.0 Buah II-a 8,600 0 25,800
13 Kereta Dorong 0.0 0.0 0.0 Buah II-a 402,000 0 0
B. Sewa Alat (Belanja Modal) 0 4,088,000
1 Sewa Mollen 18.0 0.0 18.0 HR II-b 196,000 0 3,528,000
2 Mob. dan Demob. Mollen 1.0 0.0 1.0 LS II-b 560,000 0 560,000
Sub Total 2) 0 4,165,700
UPAH (Belanja Modal)
1 Pekerja 294.0 0.0 294.0 OH III-a 60,000 0 17,640,000
2 Tukang 75.0 0.0 75.0 OH III-a 80,000 0 6,000,000
369 0 369 Sub Total 3) 0 23,640,000
OPERASIONAL
A. Administrasi (Belanja Barang) 0 185,500
1 Kertas A4 1.0 0.0 1.0 Rim I-b 41,400 0 41,400
2 Buku Besar 2.0 0.0 2.0 Buah I-b 11,500 0 23,000
3 Bolpoin 2.0 0.0 2.0 Buah I-b 5,800 0 11,600
4 Pensil 2.0 0.0 2.0 Buah I-b 4,100 0 8,200
5 Penghapus Bolpoin 1.0 0.0 1.0 Buah I-b 8,600 0 8,600
6 Penghapus Pensil 1.0 0.0 1.0 Buah I-b 4,100 0 4,100
7 Penggaris 1.0 0.0 1.0 Buah I-b 3,500 0 3,500
8 Gunting 1.0 0.0 1.0 Buah I-b 14,400 0 14,400
9 Cutter 1.0 0.0 1.0 Buah I-b 17,300 0 17,300
10 Lem 2.0 0.0 2.0 Buah I-b 2,900 0 5,800
11 Map Kertas 1.0 0.0 1.0 Pak I-b 27,600 0 27,600
12 Foto Copy 100.0 0.0 100.0 Lbr I-b 200 0 20,000
B. Musyawarah Pra Pelaksanaan dan Serah Terima, 2 Kali 40 orang (Belanja Barang) 0 853,600
1 Snack 80.0 0.0 80.0 Kotak I-a 10,000 0 800,000
2 Air Mineral 2.0 0.0 2.0 Dus I-b 26,800 0 53,600
C. Honor Pelaksana dan Pengawas (Belanja Jasa) 0 2,520,000
1 TPK (3 orang, 2 bulan) 6.0 0.0 6.0 Bulan III-c 315,000 0 1,890,000
2 Pengawas (1 orang, 2 bulan) 2.0 0.0 2.0 Bulan III-c 315,000 0 630,000
738 0 738 Sub Total 4) 0 3,559,100
TOTAL BIAYA 0 117,450,800
85,386,000
6,091,800
64,249,500
15,044,700
700,000
200,000
500,000
86,086,000
77,700
0
0
0
0
0
0
0
0
0
34,600
17,300
25,800
0
4,088,000
3,528,000
560,000
4,165,700
17,640,000
6,000,000
23,640,000
185,500
41,400
23,000
11,600
8,200
8,600
4,100
3,500
14,400
17,300
5,800
27,600
20,000
853,600
800,000
53,600
2,520,000
1,890,000
630,000
3,559,100
117,450,800
- Panjang
0,25/0,4 Lebar
0,5-0,8 Tinggi
113.0 Volume
1,001,696 Hrg/M3
209,204 OH/M3