INPUT DATA
DATA UMUM
1 Desa : Brongkal
2 Kecamatan : Pagelaran
3 Kabupaten : Malang
4 Propinsi : Jawa Timur
5 Fasilitator Kecamatan Master
6 Fasilitator Teknik Master
7 Tim Penyusun RKP Desa Master
8 Kepala Desa Master
9 NIP -
Desa : Brongkal
Kecamatan : Pagelaran
Kabupaten : Malang
Nama Kegiatan : Drainase
Harga Satuan
No. Material / Alat / Tenaga Satuan
Harga Spare
Harga Survey PPN
Survey (3-5 %)
1 Batu Belah 15/20 M3 250,000 12,500 262,500
2 Pasir Urug M3 150,000 7,500 157,500
3 Sirtu M3 90,000 4,500 94,500
4 Tanah Urug M3 60,000 3,000 63,000
5 Pasir Pasang M3 200,000 10,000 210,000
6 Batu Pecah 2/3 M3 250,000 12,500 262,500 26,250
7 Semen - 40 KG Zak 47,000 2,350 49,400 4,940
8 Semen - 50 KG Zak 53,000 2,650 55,700 5,570
9 Buis Beton, dia. 20 Buah 25,000 1,250 26,300 2,630
10 Buis Beton, dia. 30 Buah 40,000 2,000 42,000 4,200
11 Buis Beton, dia. 40 Buah 45,000 2,250 47,300 4,730
12 Buis Beton, dia. 50 Buah 65,000 3,250 68,300 6,830
13 Buis Beton, dia. 60 Buah 77,500 3,875 81,400 8,140
14 Besi, dia. 8 Batang 32,000 1,600 33,600 3,360
15 Besi, dia. 10 Batang 52,000 2,600 54,600 5,460
16 Besi, dia. 12 Batang 80,000 4,000 84,000 8,400
17 Papan begesting 2/20-2 m Lembar 17,000 850 17,900 1,790
18 Bambu Batang 10,000 500 10,500 1,050
19 Kawat bendrat Kg 15,000 750 15,800 1,580
20 Paku usuk Kg 15,000 750 15,800 1,580
21 Papan Proyek Unit 150,000 150,000
22 Kayu 4x6 lonjor 17,000 17,000
23 Prasasti uk 40 x 60 cm Unit 350,000 350,000
Harga Satuan
1,260 93,700
441 32,800
80 6,000
1,418 105,400
945 70,300
1,260 93,700
945 70,300
1,340 99,600
630 46,900
315 23,500
237 17,700
158 11,800
7,088 526,900
9,000 504,000
40,000 2,240,000
3,500 196,000
10,000 560,000
2,500 140,000
65,000
80,000
90,000
623 46,300
228 17,000
80 6,000
56 4,200
119 8,900
56 4,200
48 3,600
197 14,700
237 17,700
39 2,900
378 28,100
2 200
-
10,000
20,000
360 26,800
-
- 300,000
- 300,000
Program Pembangunan dan Pemberdayaan Masyarakat Desa
TAKE OF SHEET
Desa : Brongkal
Kecamatan : Pagelaran
Kabupaten : Malang
Sub Kegiatan : Drainase
A 0,35 0,30
a
H1
I
E
d
D
H2
b e II
c c B 0,35
B
A A
c d
H1
e
D D
H2
E E
B B
Pekerjaan pembersihan
Tebas Tebang Berupa Memotong dan Membersihkan Lokasi dari Tanaman / Tumbuhan ø < 15 cm
Dimensi Lebar
Plester- Lebar Jarak
Lebar Lebar Volume
an = Strikan Volume
Patok (2x(A+d)) 2*(H1-d)
Plesteran Strikan antar Plester-
Strikan
A H1 d E Rata-2 Rata-2 Patok an
+ +E
(0,05x2)
Pekerjaan Acian
T.01.b 1 m2 Tebas Tebang Berupa Memotong dan Membersihkan Lokasi dari Tanaman /
Tumbuhan ø < 15 cm
Tenaga Kerja
Pekerja 0.075 x 0.00 x 1.00 = 0.00 OH
Mandor 0.0075 x 0.00 x 0.00 = 0.00 OH
Pemecah batu
Upah borong/rit
1 rit = 4.5 m3 = Rp 150,000
1 Hari 1 rit = 4.50 m3 = 1.88 OH
Produktivitas per 1.00 m3 = 0.42 OH
6.4 Plesteran Tebal 1,5 cm, dengan Mortar Tipe N (Setara Campuran 1 PC:4 PP)
Pasir Pasang 0.024 x 119.59 x 1.00 = 2.87 m3
Semen (40 Kg) 0.156 x 119.59 x 1.00 = 18.66 zak
Pekerja 0.300 x 119.59 x 1.00 = 35.88 OH
Tukang batu 0.150 x 119.59 x 1.00 = 17.94 OH
Kepala tukang 0.015 x 119.59 x 1.00 = 1.79 OH
Bahan
Portland cement 0.081 x 119.59 x 1.00 = 9.72 zak
0,3
0,6
0,4
0,9
0,3
0,45
0,
50
0,
20
Volu- Control
me /
Patok Panjang Volume
Komulatif Komulatif
- 163.00 62.60 b e
- 163.00 62.60 c c
- 163.00 62.60
Galian Pondasi
- 163.00 62.60
- 163.00 62.60
- 163.00 62.60
- 163.00 62.60
- 163.00 62.60
- 163.00 62.60
- 163.00 62.60
- 163.00 62.60
- 163.00 62.60
- 163.00 62.60
- 163.00 62.60
- 163.00 62.60
- 163.00 62.60
- 163.00 62.60
62.6
62.6 m3
Volu- Control
me / A 0,3 0,3
Patok Panjang Volume 5 0
Komulatif Komulatif
H2
0,2
- 163.00 86.08 II 0
B 0,3
- 163.00 86.08 B 5
- 163.00 86.08
Pasangan Batu
- 163.00 86.08
- 163.00 86.08
- 163.00 86.08
- 163.00 86.08
- 163.00 86.08
- 163.00 86.08
- 163.00 86.08
- 163.00 86.08
- 163.00 86.08
- 163.00 86.08
- 163.00 86.08
- 163.00 86.08
- -
- 163.00 86.08
- -
- 163.00 86.08
86.1
Control
Volume
Strikan
Volume Volume
Plesteran Strikan
A
d
- 119.59 40.69
B
- 119.59 40.69
Setrikan / Siaran
- 119.59 40.69
- 119.59 40.69
- 119.59 40.69
- 119.59 40.69
- 119.59 40.69
- 119.59 40.69
- 119.59 40.69
- 119.59 40.69
- 119.59 40.69
- 119.59 40.69
- 119.59 40.69
- 119.59 40.69
- 119.59 40.69
- 119.59 40.69
40.7
OH
OH
anaman /
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
m3
m3
kg
Sewa/hari
m3
m3
zak
OH
OH
OH
m3
zak
OH
OH
OH
m3
zak
OH
OH
OH
OH
OH
OH
zak
OH
OH
RAB
otomatis
104.00
51.00
328.00
264.00
103.00
43.00
4.00
0.00
0.00
0.24
0.14
1.00
0.00
lonjor (pembulatan)
lonjor (pembulatan)
Program Pembangunan dan Pemberdayaan Masyarakat Desa
Volume
Kategori Harga
Uraian Satuan Biaya Satuan
Dana
Total Swadaya
Desa Rp.
BAHAN
A. Bahan Konstruksi (Belanja Modal)
1 Batu Belah 15/20 104.0 0.0 104.0 M3 I-a 266,500
2 Pasir Pasang 51.0 0.0 51.0 M3 I-a 213,200
3 Portland Cement (PC)-40 kg 328.0 0.0 328.0 Zak I-b 55,100
Bahan
Peralatan
Bobot (%) Upah (Belanja Jasa / Modal)
Operasional
Total
: 01
: Pembangunan Desa
: Drainase Pas. Batu
: (163 x 0,6) M
Jumlah Jumlah
Biaya Biaya
Jumlah Total
Konstruksi Konstruksi
( Rp )
(Swadaya) (Dana Desa)
Rp. Rp.
0 56,662,000
0 27,716,000 27,716,000
0 10,873,200 10,873,200
0 18,072,800 18,072,800
0 500,000
0 150,000 150,000
0 350,000 350,000
0 57,162,000 57,162,000
0 785,000
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 425,000 425,000
0 360,000 360,000
0 0 0
0 0 0
0 0
0 0
0 0 0
0 0 0
0 785,000 785,000
0 17,160,000 17,160,000
0 11,680,000 11,680,000
0 360,000 360,000
0 29,200,000 29,200,000
0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0
0 0
0 3,600,000 0
0 2,700,000 2,700,000
0 900,000 900,000
0 3,600,000 3,600,000
0 90,747,000 90,747,000
KABUPATEN
Malang
KECAMATAN
Brongkal
D E SA
Master
JENIS PRASARANA
Drainase Lantai Batu
LOKASI
xxxxx
JUDUL GAMBAR
DENAH LOKASI
Digambar Oleh :
Tim Penyusun RKP
xxxxx
Diperiksa Oleh :
xxxxx
Disetujui Oleh :
xxxxx
NIP. xxxxx
Lembar…..Dari…..Lembar
GAMBAR RENCANA
KABUPATEN
Malang
KECAMATAN
Brongkal
D E SA
Master
JENIS PRASARANA
Drainase Lantai Batu
LOKASI
xxxxx
JUDUL GAMBAR
TRASE DRAINASE
Digambar Oleh :
Tim Penyusun RKP
xxxxx
Diperiksa Oleh :
xxxxx
Disetujui Oleh :
xxxxx
NIP. xxxxx
Lembar…..Dari…..Lembar
GAMBAR RENCANA
KABUPATEN
Malang
KECAMATAN
Brongkal
D E SA
Master
JENIS PRASARANA
Drainase Lantai Batu
LOKASI
xxxxx
JUDUL GAMBAR
DETAIL SALURAN
Digambar Oleh :
Tim Penyusun RKP
xxxxx
Diperiksa Oleh :
xxxxx
Disetujui Oleh :
xxxxx
NIP. xxxxx
Lembar…..Dari…..Lembar