NO Uraian Satuan Volume Harga Satuan Biaya


1 Batu Kali Truk 25 700,000 17,500,000
2 Batako Biji 10000 2,400 24,000,000
3 Semen Sak 1000 51,000 51,000,000
4 Genting Wuwung Biji 150 7,000 1,050,000
5 Genting Biji 12000 3,500 42,000,000
6 Kalsiboard Lembar 52 45,000 2,340,000
7 Kayu 8 x 12 x 4 m Batang 75 115,000 8,625,000
8 Usuk 5 x 5 x 4 m Batang 300 20,000 6,000,000
9 Usuk 5 x 5 x 3 m Batang 300 15,000 4,500,000
10 Pasir Truk 25 1,200,000 30,000,000
11 Kusen 2 x 130 Biji 6 250,000 1,500,000
12 Kusen 2 x 90 Biji 10 250,000 2,500,000
13 Jendela 110 x 160 Biji 3 250,000 750,000
14 Jendela 110 x 120 Biji 12 200,000 2,400,000
15 Besi 12 mm Kg 1000 12,000 12,000,000
16 Besi 10 mm Kg 400 12,000 4,800,000
17 Keramik m 150 80,000 12,000,000
18 Reng Kayu m 1500 3,000 4,500,000
19 Usuk Plafon m 400 5,000 2,000,000
20 Eternit Lembar 160 7,000 1,120,000
21 Paralon 3' Biji 15 100,000 1,500,000
22 Paralon 4' Biji 13 130,000 1,690,000
23 Paralon 3/4' Biji 20 25,000 500,000
24 Wastafel Biji 8 250,000 2,000,000
25 Closet Biji 8 175,000 1,400,000
26 Pintu PVC Biji 8 350,000 2,800,000
27 Keramik 25 x 25 m 45 62,000 2,790,000
28 Keramik 25 x 20 m 55 62,000 3,410,000
29 Bergesting 2 x 20 x 2 m Biji 80 7,500 600,000
30 Semen Putih sak 12 95,000 1,140,000
31 Batu Koral Rit 17 1,200,000 20,400,000
32 Bendrat Kg 40 15,000 600,000
33 Lem Rajawali Dus 5 180,000 900,000
34 Selot Pintu Biji 8 150,000 1,200,000
35 Daun Pintu Biji 8 750,000 6,000,000
36 Kaca Lembar 23 460,000 10,580,000
37 Engsel Biji 60 25,000 1,500,000
38 Claster Angin- Angin Biji 35 35,000 1,225,000
39 Talang Lembar 8 45,000 360,000
40 Cat Kayu Kaleng 12 80,000 960,000
41 Cat Tembok Kaleng 4 650,000 2,600,000
42 Kuas Biji 20 15,000 300,000
43 Paku Kg 52 14,000 728,000
44 Kapi Biji 20 10,000 200,000
45 Daun Jendela Biji 17 250,000 4,250,000

TOTAL BIAYA Rp 300,218,000

Donomulyo, 10 Juli 2018


Dibuat Oleh

MWC NU Donomulyo Ketua Bendahara

K.H. AHMAD ZAINURI M. ALFAN MAS'UD, BA Drs. BURHANUDIN


PENGURUS MAJELIS WAKIL CABANG

NAHDLATUL ULAMA'
KECAMATAN DONOMULYO - KAB. MALANG
Sekretariat : Jl. Diponegoro No. 424 RT. 09/RW. 03
Donomulyo - Malang 65167

RINCIAN PENGGUNAAN ANGGARAN BELANJA REHAB GEDUNG


MWC NU KECAMATAN DONOMULYO

Kabupaten : Malang
Kecamatan : Donomulyo
Desa : Donomulyo

No Uraian Satuan Volume Harga Satuan Biaya


1 Bantuan Biji 8,000 600 4,800,000
2 Batu bata m³ 20 80,000 1,600,000
3 Batu gebal m³ 40 120,000 4,800,000
4 Pasir pasang m³ 20 90,000 1,800,000
5 Pasir urug Zak 130 53,000 6,890,000
6 Semen PC 40 Kg Biji 5,000 900 4,500,000
7 Genting press Biji 60 4,000 240,000
8 Genting bumbungan Lonjor 50 90,000 4,500,000
9 Besi beton Ø 11 mm / 12 m Lonjor 60 80,000 4,800,000
10 Besi beton Ø 6 mm / 12 m Lonjor 30 150,000 4,500,000
11 Besi beton Ø 12 mm / 12 m Batang 40 25,000 1,000,000
12 Kayu tahun 4/6 x 4 m Batang 40 95,000 3,800,000
13 Kayu tahun 4/12 x 4 m Batang 50 120,000 6,000,000
14 Kayu tahun 8/12 x 4 m Batang 50 50,000 2,500,000
15 Kayu tahun 4/10 x 4 m m³ 20 162,500 3,250,000
16 Kerikil 2/3 Lembar 128 5,000 640,000
17 Papan bekesting Kg 20 162,500 3,250,000
18 Paku usuk kayu Kg 10 5,000 50,000
19 Paku reng kayu Kg 20 15,000 300,000
20 Paku dudur Kg 6 15,000 90,000
21 paku internit 2 sak 40 15,000 600,000
22 Semen putih Kg 10 15,000 150,000
23 Kawat budrat Potong 300 4,000 1,200,000
24 Usuk 5 x 5 x 4 Potong 200 6,000 1,200,000
TOTAL BIAYA 62,460,000

Donomulyo, 30 Juni 2014


Dibuat Oleh

MWC NU Donomulyo Ketua Bendahara

K.H. AHMAD ZAINURI M. ALFAN MAS'UD Drs. BURHANUDIN


MAJELIS WAKIL CABANG NADDLATUL ULAMA'
KECAMATAN DONOMULYO - KAB. MALANG

RENCANA ANGGARAN BELANJA REHAB GEDUNG MWC NU


KECAMATAN DONOMULYO

Kabupaten : Malang
Kecamatan : Donomulyo
Desa : Donomulyo

No Uraian Satuan Volume Harga Satuan Biaya


1 Batu kali Biji 5,000 600 3,000,000
2 Batako m³ 10 80,000 800,000
3 semen m³ 15 120,000 1,800,000
4 Genting Wuwung m³ 10 90,000 900,000
5 Genting Zak 30 53,000 1,590,000
6 Kalsi board Biji 1,500 900 1,350,000
7 Kayu 8 x 12 x 4 m Biji 55 4,000 220,000
8 Usuk 5 x 5 x 4 m Lonjor 18 90,000 1,620,000
9 Pasir Lonjor 18 80,000 1,440,000
10 Kusen 2 x 130 Lonjor 15 150,000 2,250,000
11 Kusen 2 x 90 Batang 15 25,000 375,000
12 Jendela 110 x 160 Batang 12 95,000 1,140,000
13 Jendela 110 x 120 Batang 12 120,000 1,440,000
14 Besi Batang 15 50,000 750,000
15 Paru m³ 10 162,500 1,625,000
16 Keramik Zak 10 150,000 1,500,000
17 Reng Lembar 120 5,000 600,000
18 Usuk Plafon Kg 10 5,000 50,000
19 Eternit Kg 10 15,000 150,000
20 Paralon 3' Kg 6 15,000 90,000
21 Paralon 4' 2 sak 40 15,000 600,000
22 Paralon 1/2' Kg 10 15,000 150,000
23 Wastafel Potong 180 4,000 720,000
24 Closet Potong 140 6,000 840,000
Donomulyo, 30 Juni 2014
Dibuat Oleh

MWC NU Donomulyo Ketua Bendahara

K.H. AHMAD ZAINURI M. ALFAN MAS'UD Drs. BURHANUDIN