RENCANA KEBUTUHAN MATERIAN REHABILITASI ASRAMA SANTRI

PONDOK PESANTREN PUTRA PUTRI DARUN NAJA PEMANADI


TAHUN ANGGARAN 2010
No Nama Barang Volume satuan Jumlah
1 Batu Split 10 kubik 800,000 8,000,000
2 Batu Bata 30 ribu 700,000 21,000,000
3 Pasir 100 kubik 200,000 20,000,000
4 Koral 60 kubik 350,000 21,000,000
5 Besi 12 In 150 batang 120,000 18,000,000
6 Besi 10 in 300 batang 90,000 27,000,000
7 Besi 8 in 250 batang 75,000 18,750,000
8 Kawat Tali 50 Kg 30,000 1,500,000
9 Paku 50 Kg 30,000 1,500,000
10 Semen 800 Sak 75,000 60,000,000
11 Kayu dolken 500 Buah 15,000 7,500,000
12 Papan 2 x 25 cm 10 Kubik 1,800,000 18,000,000
13 Kayu 4 x 6 cm 8 kubik 1,800,000 14,400,000
14 Triplek 9 mm 200 Lembar 135,000 27,000,000
15 Kusen dan pintu 14 Buah 1,500,000 21,000,000
16 Kusen dan jendela 45 Buah 500,000 22,500,000
17 Kunci Pintu 45 Buah 150,000 6,750,000
18 Keramik 500 Dus 70,000 35,000,000
19 Kabel 8 Rol 400,000 3,200,000
20 Lampu 24 Buah 80,000 1,920,000
21 Paralon Kabel 25 batang 12,000 300,000
22 Saklar 14 Buah 25,000 350,000
23 Stop Kontak 14 Buah 25,000 350,000
24 Selang air 1 Rol 1,000,000 1,000,000
25 Kabel TC 50 Meter 5,000 250,000
26 Biaya kerja 50,000,000
Jumlah 406,270,000

Pemandi, 13 Agustus 2017


Menyetujui :
Penanggung Jawab Bendahara

H. M. Anwaruddin Luqman Zamroji