Anda di halaman 1dari 4

DATA PENERIAMAAN DAN PENGELUARAN BIAYA

PEMBANGUNAN MUSHALLA AHLUSUNNAH WALJAMA'AH GAMPONG BAKAU HULU


KECAMATAN LABUHANAHJI

DITERIMA BANTUAN DANA HIBAH DARI BUPATI ACEH SELATAN MELALUI DINAS
SYARI'AT ISLAM KABUPATEN ACEH SELATAN SEJUMLAH Rp. 50.000.000'-
PENGELUARAN DANA SEBAGAI BERIKUT

HARGA
NO NAMA BARANG VOLUME JUMLAH
SATUAN @
1 Semen 65 Sak 70,000 Rp 4,550,000
2 Besi 12 in 15 Batang 105,000 Rp 1,575,000
3 Besi 10 in 20 Batang 72,000 Rp 1,440,000
4 Besi 7 in 20 Batang 40,000 Rp 800,000
5 Kawat Icat 1 Gulung 120,000 Rp 120,000
6 Kerikil Beton 10 M³ 105,000 Rp 1,050,000
7 Pasir Halus 10 M³ 90,000 Rp 900,000
8 Papan Mal Pj 5 M 10 Lembar 50,000 Rp 500,000
9 Rang 5x7 Pj 5 M 20 Batang 70,000 Rp 1,400,000
10 Keramik Ikat 50 x 50 80 Kotak 100,000 Rp 8,000,000
11 Batu Batako 5 x 15 Pj 30 cm 500 Biji 4,000 Rp 2,000,000
12 Paku Beton 3 In 4 Kotak 30,000 Rp 120,000
13 Paku 4 In 5 Kg 25,000 Rp 125,000
14 Cat Aries Standar 691.25 kg 6 Kaleng 230,000 Rp 1,380,000
15 Cat Aries Standar 686.5 kg 8 Kaleng 60,000 Rp 480,000
16 Cat Yugo 799. 5 Kg 6 Kaleng 60,000 Rp 360,000
17 Pipa Paralon PVC Aicu Awe 3 In 4 Batang 115,000 Rp 690,000
18 Elbo Sambungan Pipa 3 In 5 Buah 25,000 Rp 125,000
19 Elbo Sambungan Pipa 3/4 In 8 Buah 15,000 Rp 120,000
20 Pipa Paralon 3/4 In 8 Batang 40,000 Rp 320,000
21 Kran Stop Komplek 8 Buah 40,000 Rp 320,000
22 Pintu Kamar Wudhuk 2 Unit 450,000 Rp 900,000
23 Mesin Pompa Air Shisuzu 1 Unit 650,000 Rp 650,000
24 Triplet 4 In 15 Lembar 75,000 Rp 1,125,000
25 Kran Stop 1/2 In 8 Buah 30,000 Rp 240,000
26 Soket Drat Dalam 8 Buah 5,000 Rp 40,000
24 Lem Piapa Inplas Odol 5 Buah 10,000 Rp 50,000
25 Tepung Dompol 10 Buah 20,000 Rp 200,000
26 Tiner II D Botol 4 Buah 30,000 Rp 120,000
27 Kuwas 2 In dan 3 In 4 Buah 20,000 Rp 80,000
28 Kuwas Roda 9 In 3 Buah 40,000 Rp 120,000
29 Seng Atap 7 Kaki 1 Kodi 1,590,000 Rp 1,590,000
30 Parabung Seng 7 Kaki 2 Lembar 30,000 Rp 60,000
31 Kabel Nim Listrik 2,5 mili 20 Meter 10,000 Rp 200,000
32 Bola lampu Hanox 4 Buah 40,000 Rp 160,000
33 Bangku Rangkaian Tikar 2 ,5 x 1 M 1 Unit 1,200,000 Rp 1,200,000
34 Upah Pekerja 20 HOK 4 Orang 100,000 Rp 8,000,000
35 Kepala Tukang 20 HOK 1 Orang 200,000 Rp 4,000,000
36 Ongkos Cat Mushalla 200 Meter 10,000 Rp 2,000,000
37 Bonbom Sambungan Keramik 300 Biji 1,000 Rp 300,000
38 Snack Dan Kopi 30 Hari 50,000 Rp 1,500,000
39 Biaya Pemasukan Air Bersih 1 Paket 700,000 Rp 700,000
40 Persiapan Laporan dan ATK 1 Paket 390,000 Rp 390,000
Jumlah Rp 50,000,000

DESA BAKAU HULU, AGUSTUS 2022


PANITIA PEMBANGUNAN MUSHALLA
AHLUSUNNAH WALJAMA'AH BAKAU HULU

KETUA SEKRETARIS

MASTUTIN. S.Pd MAULANA SABRI