BUILD OF QUANTITY

Bangunan
No. Barang Jumlah Satuan Harga Satuan Harga Barang
1 Batu 20 Kubik Rp 120,000.00 Rp2,400,000.00
2 Pasir 50 Kubik Rp240,000.00 Rp12,000,000.00
3 Semen 150 Sak Rp80,000.00 Rp12,000,000.00
4 Bata Merah 12000 Buah Rp800.00 Rp9,600,000.00
5 Bambu (4 meter) 80 Batang Rp32,000.00 Rp2,560,000.00
6 Kayu Pohon Kelapa (6 meter) 20 Batang Rp75,000.00 Rp1,500,000.00
7 Kayu Borneo (8x12) (4 meter) 10 Batang Rp120,000.00 Rp1,200,000.00
8 Genting Merah 6000 Buah Rp1,500.00 Rp9,000,000.00
9 Kayu Borneo Pintu 10 Buah Rp120,000.00 Rp1,200,000.00
10 Kaca jendela 14 m² Rp90,000.00 Rp1,260,000.00
11 Besi Beton lebar 10x10cm 40 m² Rp120,000.00 Rp4,800,000.00
12 Keramik (WC dan Rumah) 110 Karton Rp80,000.00 Rp8,800,000.00
13 Cat Tembok Interior Avian 25Kg 6 Kaleng Rp450,000.00 Rp2,700,000.00
14 Cat Kayu Avian 2Kg 4 Kaleng Rp52,000.00 Rp208,000.00
Paku 2 sampai 4 Inci 30 Kg Rp45,000.00 Rp1,350,000.00
TOTAL Rp70,578,000.00

Instalasi Air
No. Barang Jumlah Satuan Harga Satuan Harga Barang
15 Pipa Wavin 4 Inci (4 meter) 2 Batang Rp90,000.00 Rp180,000.00
16 Pipa Wavin 1 Inci (4 meter) 15 Batang Rp30,000.00 Rp450,000.00
17 Keran Air 3 Buah Rp70,000.00 Rp210,000.00
18 Motor Listrik Sanyo Semi Jetpump 1 Buah Rp900,000.00 Rp900,000.00
19 Selotip Pipa Onda 5 Buah Rp4,500.00 Rp22,500.00
TOTAL Rp1,762,500.00

Instalasi Listrik
No. Barang Jumlah Satuan Harga Satuan Harga Barang
20 MCB Schneider 4A 2 Buah Rp45,000.00 Rp90,000.00
21 Supreme NYY 3x2,5 mm² 1 Rol Rp415,000.00 Rp415,000.00
22 Supreme NYMHY 3x1,5 mm² 3 Rol Rp230,000.00 Rp690,000.00
23 Kotak Kontak Outbow Broco 10 Buah Rp28,000.00 Rp280,000.00
24 Sakelar Tunggal Broco 10 Buah Rp22,000.00 Rp220,000.00
25 Sakelar Seri Broco 3 Buah Rp27,000.00 Rp81,000.00
26 Lampu Philips LED 25W 10 Buah Rp16,000.00 Rp160,000.00
27 Lampu Philips Tube Lamp 20W 2 Buah Rp46,000.00 Rp92,000.00
28 Sekrup 2 Bungkus Rp40,000.00 Rp80,000.00
29 Armatur TL 1 Buah Rp50,000.00 Rp50,000.00
30 Fitting Lampu 10 Buah Rp18,000.00 Rp180,000.00
TOTAL Rp2,338,000.00
TOTAL KESELURUHAN MATERIAL Rp74,678,500.00
Biaya Pekerja
No. Jenis Pekerja Jumlah Pekerja Harga Satuan Lama Kerja
1 Tukang Kayu 2 Rp 200,000.00 Per hari 45
2 Tukang Batu 2 Rp 200,000.00 Per hari 55
3 Tukang Gali 2 Rp 200,000.00 Per hari 50
4 Tukang Listrik 2 Rp 200,000.00 Per hari 38
5 Tukang Bor Air 2 Rp 125,000.00 Per hari 16
TOTAL KESELURUHAN BIAYA PEKERJA

Biaya Tambahan
No. Tambahan Biaya
1 Makanan Pokok Rp 14,250,000.00
2 Makanan Ringan Rp 8,700,000.00
3 Air Mineral Rp 9,500,000.00
TOTAL Rp 32,450,000.00

TOTAL BIAYA ANGGARAN PROYEK


No. Keperluan Biaya
1 Material Rp74,678,500.00
2 Biaya Pekerja Rp 79,200,000.00
3 Biaya Tambahan Rp 32,450,000.00
4 Pajak (10%) Rp 18,632,850.00
TOTAL ANGGARAN Rp204,961,350.00
Total Biaya Kerja
Rp 18,000,000.00
Rp 22,000,000.00
Rp 20,000,000.00
Rp 15,200,000.00
Rp 4,000,000.00
Rp 79,200,000.00

Anda mungkin juga menyukai