NO URAIAN SATUAN
NO URAIAN SATUAN
I. BAHAN BANGUNAN
1 Pasir Urug M
2 Pasir Pasang M
3 Kayu Nantu Papan M
4 Kayu Nantu Balok/ usuk 5/7 M
5 Papan 3/20 meranti M
6 Paku 2"- 5" Kg
7 Minyak Begisting Ltr
8 Kawat Bendrat Kg
9 Besi Baut / Beugel Ornamen Bh
10 Trackstang Kg
11 Plat baja 6 mm Kg
12 Roll Dim 2" Bh
13 Besi Beton polos Kg
14 Pipa besi hitam 2" M
15 Besi Pipa Galvanis 3" M
16 Besi Pipa Galvanis 4" M
17 Pipa PVC 2" (type AW) M
18 Klem Pipa Bh
19 Plat Besi 1,2 cm Uk 30x30cm Kg
20 Angkur Beton + Mur 22" Bh
21 Semen PC Kg
22 Pasir Beton M
23 Koral Beton M
24 Armateur Lengkap - PLC 60W Unt
25 Terminal kabel 4 jalur Bh
26 Sekering Mcb Thermis 10-25 Ampere Bh
27 MCB 6A/220 Volt (type MG) Bh
28 MCB BOX Plastik Outdoor Bh
29 Kabel NYY 2 x 25mm (SUPREME) M
30 Kabel Twisted 2 x 10 mm M
31 Klem Kabel Bh
32 Isolator Bh
33 Asesoris Kabel Twisted Set
34 Tap Connector 06-25/35-70 mm2 Bh
35 Panel Box ( Uk. 45 x 60 x 25 cm ) Unt
36 Suspension Clamp BH
37 Suspension Bracket BH
38 Stainless steel Belt M
39 Stopping beugle BH
40 Fix and dead BH
41 Tension Bracket BH
42 Grounding Penangkal Petir Lot
43 Cat dasar Kg
44 Cat antara Kg
45 Cat penutup Kg
46 Thiner Ltr
47 Lampu PLC 45 watt ( Philips ) Bh
48 Kawat Las Listrik Kg
49 Minyak Pelumas Ltr
50 Solar Ltr
51 Pasang Arde Pada Tiap Titi Lampu Unt
52 Timer Swith ( type Sul ) Bh
53 Megnetik Kontraktor Bh
54 Alumunium Busbar Bh
55 Mcb 1 ph Bh
56 Mcb 3 ph Bh
57 Terminal Blok Heat Resistan Bh
58 Panel Box 40x65x20x2 Bh
59 Rel Omega Bh
60 Box MCB plat seng outdoor Bh
61 Pipa paralon PVC 5/8" M
DAFTAR HARGA SEWA ALAT
NO URAIAN SATUAN
HARGA
(Rp.)
PEKERJAAN PERSIAPAN
A1 1 TITIK PENGUKURAN DAN PEMASANGAN TANDA BATAS
Bahan
0.01 m3
0.02 kg
0.00 m3
Upah :
0.10 Hr
0.10 Hr
0.01 Hr
0.01 Hr
PEKERJAAN TANAH
B1 1 M GALIAN TANAH KERAS
Bahan -
Upah :
0.63 Hr
0.00 Hr
0.00 Hr
0.06 Hr
Alat :
0.25 Hr
B3 1 M URUGAN KEMBALI
Bahan -
Upah :
0.19 Hr
0.00 Hr
0.00 Hr
0.02 Hr
B5 1 M URUGAN PASIR
Bahan
1.20 M3
Upah :
0.30 Hr
0.00 Hr
0.00 Hr
0.01 Hr
PEKERJAAN PONDASI
C1 1 M MEMBUAT PONDASI BETON BERTULANG ( 150 Kg besi dan Begisting)
Bahan
0.20 m3
2.00 Kg
0.40 Ltr
150.00 Kg
2.25 Kg
371.00 Kg
0.52 m3
0.75 m3
Upah
3.90 Hr
0.35 Hr
1.04 Hr
1.05 Hr
0.25 Hr
0.17 Hr
PEKERJAAN PLESTERAN
D1 1 M PLESTERAN BETON 1 PC : 3 PS / TEBAL 15 MM
Bahan
6.50 kg
0.02 m3
Upah :
0.20 Hr
0.15 Hr
0.02 Hr
0.01 Hr
D2 1 M' ACIAN
Bahan
3.25 kg
Upah :
0.15 Hr
0.20 Hr
0.01 Hr
0.01 Hr
D3 1 M' BENANGAN
Bahan
1.30 kg
Upah :
0.12 Hr
0.20 Hr
0.02 Hr
0.02 Hr
E2
Upah
0.50 Hr
0.75 Hr
0.50 Hr
0.50 Hr
2.00 Hr
Bahan
1.50 m'
3.00 m'
4.00 m'
17.00 kg
Biaya
Penyambungan
75.36 Cm
Upah
0.03 hari
0.03 hari
1.50 hari
Bahan
1.00 unit
Bahan
0.50 kg
Bahan
1.00 buah
1.00 buah
1.20 m'
4.00 buah
2.00 buah
1.00 buah
Bahan
1.00 m'
0.40 buah
Bahan
3.00 kg
1.00 bh
1.00 bh
1.00 bh
1.00 bh
1.00 bh
1.00 bh
1.00 bh
1.00 bh
1.00 m'
2.00 bh
PEKERJAAN PENGECATAN
Pekerja @ Rp -
Tukang gali @ Rp -
Kepala Tukang Gali @ Rp -
Mandor @ Rp -
Pekerja @ Rp -
Tukang gali @ Rp -
Kepala Tukang Gali @ Rp -
Mandor @ Rp -
Pekerja @ Rp -
Tukang gali @ Rp -
Kepala Tukang Gali @ Rp -
Mandor @ Rp -
TANAH
Pekerja @ Rp -
Tukang gali @ Rp -
Kepala Tukang Gali @ Rp -
Mandor @ Rp -
Pasir Urug @ Rp -
Pekerja @ Rp -
Tukang gali @ Rp -
Kepala Tukang Gali @ Rp -
Mandor @ Rp -
Kayu Meranti @ Rp -
Paku 2"- 5" @ Rp
Minyak Begisting @ Rp
Besi Beton polos @ Rp
Kawat Bendrat @ Rp
Semen PC @ Rp
Pasir Beton @ Rp
Koral Beton @ Rp
Pekerja @ Rp
Tukang Batu @ Rp
Tukang Kayu @ Rp
Tukang Besi @ Rp
Kepala Tukang @ Rp
Mandor @ Rp
3 PS / TEBAL 15 MM m2
PC (Gresik ) @ Rp
Pasir Pasang @ Rp
Pekerja @ Rp
Tukang Batu @ Rp
Kepala Tukang @ Rp
Mandor @ Rp
m'
Semen PC @ Rp
Pekerja Terampil @ Rp
Tukang Batu @ Rp
Kepala Tukang @ Rp
Mandor @ Rp
m'
Semen PC @ Rp
Pekerja Terampil @ Rp
Tukang Batu @ Rp
Kepala Tukang @ Rp
Mandor @ Rp
MASANGAN TIANG
SANGAN ORNAMEN LAMPU PJU ( Panjang 3 m )
Mandor @ Rp
Kepala Tukang Listrik @ Rp
Tukang Listrik @ Rp
Pekerja @ Rp
Pipa besi hitam 2" @ Rp
Besi beugel (Baut) Ornamen @ Rp
Plat Baja Tebal 5 mm (Trackstang) @ Rp
Roll Dim 2" @ Rp
Sewa crane @ Rp
Mandor @ Rp
Tukang Las @ Rp
Tukang Listrik @ Rp
Pekerja Terampil @ Rp
Pekerja tak Terampil @ Rp
Sewa crane @ Rp
Sewa Alat Bantu PJU @ Rp
Jumlah (I)+(II)+(III)
Pekerja @ Rp
Tukang Las @ Rp
Kepala Tukang Las @ Rp
Mandor @ Rp
Peralatan Las @ Rp
Jumlah (I)+(II)+(III)
MASANGAN ARMATUR
Mandor @ Rp
Tukang Listrik @ Rp
Mandor @ Rp
Tukang Las @ Rp
Pekerja @ Rp
Jumlah ( I ) + ( II )
MASANGAN JAR.KABEL
TOR CABLE (buah)
Biaya Pemasangan @ Rp -
Suspension Clamp @ Rp -
Suspension Bracket @ Rp -
Stainless steel Belt @ Rp -
Stopping Buckle @ Rp -
Fix and dead @ Rp -
Tension Bracket @ Rp -
Jumlah ( I ) + ( II )
l NYY 2x2.5 mm
Biaya Pemasangan @ Rp -
Mandor @ Rp -
Tukang Listrik @ Rp -
Thiner @ Rp -
Cat dasar @ Rp -
Cat antara @ Rp -
Cat penutup @ Rp -
Pekerja @ Rp -
Tukang cat @ Rp -
Kepala tukang @ Rp -
Mandor @ Rp -
Jumlah ( I ) + ( I
Rp 24,000
Rp 432
Rp -
Jumlah I Rp 24,432
Rp 12,500
Rp 10,000
Rp 1,500
Rp 1,350
Jumlah II Rp 25,350
Jumlah ( I ) + ( Rp 49,782 Rp 49,700
Rp -
Rp -
Rp -
Rp -
Jumlah I Rp -
Rp -
Rp -
Rp -
Rp -
Jumlah I Rp -
Rp -
Rp -
Jumlah I+II Rp -
Rp -
Rp -
Rp -
Rp -
Jumlah I Rp -
Rp -
Rp -
Rp -
Rp -
Jumlah I Rp -
Rp -
Jumlah I Rp -
Rp -
Rp -
Rp -
Rp -
Jumlah II Rp -
Jumlah ( I ) + ( Rp -
Rp -
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Jumlah Rp
Rp
Rp
Rp
Rp
Rp
Rp
Jumlah Rp
Jumlah Rp
Rp
Rp
Jumlah Rp
Rp
Rp
Rp
Rp
Jumlah Rp
Jumlah Rp
Rp
Jumlah Rp
Rp
Rp
Rp
Rp
Jumlah Rp
Jumlah Rp
Rp
Jumlah Rp
Rp
Rp
Rp
Rp
Jumlah Rp
Jumlah Rp
Rp
Rp
Rp
Rp
Jumlah Rp
Rp
Rp
Rp
Rp
Jumlah Rp
Rp
Rp
Jumlah Rp
Rp
Jumlah IV Rp
Jumlah (I)+(II) Rp
Rp -
Rp -
Rp -
Rp -
Rp -
Jumlah I Rp
Rp -
Rp -
Rp -
Rp -
Jumlah II Rp
Rp -
Rp -
Jumlah III Rp
Rp -
Jumlah IV Rp
Rp
Rp -
Rp -
Rp -
Rp -
Jumlah I Rp
Rp -
Rp -
Rp -
Jumlah II Rp
Rp -
Jumlah III Rp
Rp
Rp -
Rp -
Rp -
Rp - Rp
Rp -
Rp
Rp -
Rp
Rp
Rp -
Rp -
Jumlah I Rp
Rp -
Jumlah II Rp
Rp
Rp -
Jumlah I Rp -
Rp -
Jumlah I Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Jumlah II Rp -
Rp -
Rp -
Jumlah I Rp -
Rp -
Rp -
Jumlah II Rp -
Jumlah ( I ) + ( Rp -
Rp -
Rp -
Jumlah I Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Jumlah II Rp -
Jumlah ( I ) + ( Rp -
Rp -
Rp -
Rp -
Rp -
Jumlah I Rp -
Rp -
Rp -
Rp -
Rp -
Jumlah II Rp -
Rp -
BILL of QUANTITY ( BQ )
NO URAIAN PEKERJAAN
I PEKERJAAN PERSIAPAN
1 Pengukuran Dan Pemasangan Tanda Batas
VII BPUJL
ANTITY ( BQ )
AHUN 2017
KAN BELANG
HARGA SATUAN
SATUAN VOLUME JUMLAH (Rp.)
(Rp.)
Ttk 11 Rp Rp
Rp
Ttk 11 Rp Rp
Rp
Unt 11 Rp Rp
Bh 11 Rp Rp
Bh 11 Rp Rp
Bh 11 Rp Rp
unit 11 Rp Rp
Rp
m' 608 Rp Rp
m' 77 Rp Rp
set 11 Rp Rp
unit 11 Rp Rp
m' 33 Rp Rp
m' 608 Rp Rp
set 11 Rp Rp
m' 44 Rp Rp
Rp
unit 1.0 Rp Rp
Lot 1 Rp Rp
Lot 11 Rp Rp
Rp
App 1 Rp Rp
App 1 Rp Rp
App 1 Rp Rp
App 1 Rp Rp
App 1 Rp Rp
Rp
VA 1300 Rp Rp
Rp
DAFTAR HARGA SATUAN BAHAN
SKPD :
NAMA PAKET :
LOKASI :
VOLUME :
PROP/KAB/KODYA :
NO URAIAN SAT
1 BA-001 Mandor/Tenaga Ahli Listrik oh
2 BA-002 Mandor/Tenaga Ahli konstruksi oh
3 BA-003 Operator Truck Crane bucket oh
4 BA-004 Operator Truck Crane kapasitas 2,5 ton oh
5 BA-005 Operator Truck kapasitas 7 ton oh
6 BA-006 Operator Truck Tangga 12 meter oh
7 BA-007 Tukang Listrik oh
8 BA-008 Tukang Konstruksi oh
9 BA-009 Pembantu Tukang Listrik oh
10 BA-010 Pembantu Tukang Konstruksi oh
11 BA-011 Mandor Tenaga Ahli Sipil oh
12 BA-012 Tukang Batu oh
13 BA-013 Pembantu Tukang Batu oh
14 BA-014 Sopir oh
15 BA-015 Tukang Gali Tanah oh
III ALAT
1 CA-001 Sewa Truck Crane Bucket hari
2 CA-002 Sewa Truck Crane kapasitas 2,5 ton hari
3 CA-003 Sewa Truck kapasitas 7 ton hari
4 CA-004 Sewa Truck tangga 12 meter hari
5 CA-005 Tangga 7 meter hari
6 CA-006 Alat bantu hari
7 CA-007 Katrol pengangkat tiang hari
8 CA-008 Beton molen hari
9 CA-009 Penggetar beton/ Vibrator hari
10 CA-010 Stamper hari
11 CA-011 Jack Hammer hari
12 CA-012 Mobil Pickup hari
166,350,000
HARGA SATUAN Price List
4,960,800.00 OPERA 150 W 4,134,000.00
3,426,000.00 OPERA 900, 250 W 2,855,000.00
4,976,400.00 HK POLE 4,147,000.00
4,118,400.00 HK POLE 3,432,000.00
4,118,400.00 NINGBO 5,334,000.00
504,000.00 LOKAL 420,000.00
660,000.00 LOKAL 550,000.00
54,000.00 LOKAL 45,000.00
540,000.00 LOKAL 450,000.00
500,000.00 LOKAL 350,000.00
85,000.00 LOKAL 85,000.00
550,000.00 PUJI DHARMA 550,000.00
2,250,000.00 2,000,000.00
50,000.00 75,000.00
175,000.00 150,000.00
55,000.00 50,000.00
15,250.00 VOKSEL 15,300.00
10,500.00 VOKSEL 4,800.00
4,455,000.00
122,500.00 VOKSEL 102,000.00
90,150.00 VOKSEL 83,160.00
25,000.00 VOKSEL 11,000.00
41,000.00 VOKSEL 25,000.00
1,800,000.00
13,500.00
42,000.00
240,000.00
4,500.00 SINARINDO
19,000.00 SINARINDO
19,000.00 SINARINDO
22,000.00 SINARINDO
13,000.00 SINARINDO
27,000.00 SINARINDO
6,000.00 SINARINDO
12,000.00 SINARINDO
12,000.00 LOKAL
2,350.00 LOKAL
2,000.00 LOKAL
5,574,800.00 LOKAL
778,000.00 LOKAL
55,000.00 LOKAL
75,000.00 LOKAL
16,000.00 LOKAL
11,000.00 LOKAL
10,000.00 LOKAL
7,500.00 LOKAL
450,000.00 LOKAL
23,500.00 LOKAL
225,000.00 LOKAL
5,000.00 LOKAL
102,500.00 LOKAL 615,000.00
10,750.00 LOKAL 165,000.00
3,500.00 LOKAL 615,000
25,500.00 LOKAL
65,800.00 LOKAL
180,000.00 LOKAL
375,000.00 LOKAL
215,000.00 LOKAL
100,000.00 LOKAL
15,000.00 LOKAL
20,000.00 LOKAL
20,000.00 LOKAL
15,000.00
135,000.00 LOKAL
750.00 LOKAL
775.00 LOKAL
280.00
400.00 LOKAL
500.00
1,000,000.00
75,000.00 LOKAL
HARGA SATUAN
175,000.00 oh
175,000.00 oh
150,000.00 oh
150,000.00 oh
150,000.00 oh
150,000.00
150,000.00 oh
150,000.00 oh
125,000.00 oh
100,000.00 oh
175,000.00 oh
150,000.00 oh
100,000.00 oh
150,000.00 oh
100,000.00 oh
#N/A
#N/A
#N/A
LAT #N/A
#N/A
#N/A
#N/A
#N/A
#N/A
1,650,000.00 hari
1,650,000.00 hari
1,500,000.00 hari
1,500,000.00 #N/A
75,000.00 hari
120,000.00 hari
220,000.00 #N/A
250,000.00 hari
250,000.00 hari
250,000.00 hari
450,000.00 #N/A
450,000.00 hari
#N/A
#N/A
#N/A
#N/A
AN #N/A
#N/A
#N/A
#N/A
#N/A
55,878.00 titik
41,288.00 titik
26,333.00 titik
#N/A #N/A
#N/A #N/A
#N/A #N/A
4,160.00 m'
#N/A #N/A
28,682.00 m'
223,000.00 titik
306,614.00 m1
163,500.00 m3
5,574,800.00 set
743,200.00 titik
334,954.00 titik
#N/A #N/A
919,431.00 titik
#N/A #N/A
138,212.00 titik
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
532,917.00 titik
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
293,375.00 titik
184,650.00
37,575.00
Panel Box 40x60x20 cmRp 578.000,-
Panel Box 40x50x20 cmRp 486.000,-
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
92,250.00 30,750.00 738,000.00
24,750.00 8,250.00 198,000.00
92,250.00 30,750.00 738,000.00
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
ANALISA HARGA SATUAN
SKPD :
NAMA PAKET :
LOKASI :
VOLUME :
PROP/KAB :
Bahan
1 AJ-011 Pasir Urug 0.0300
2 AJ-012 Batu Bata 7.1429
Bahan
1 AJ-001 Aspal 1.8000
2 AJ-004 Kerikil Saring 0.1000
3 AJ-005 Sirtu 0.1000
4 AJ-003 Pasir 0.0500
5 CA-010 Stamper 0.0357
6 CA-006 Alat bantu 0.0357
Jumlah Tenaga Ke
Bahan
1 AI-002 Box panel 60x40x25 cm 1.0000
2 AI-005 Angkur 22 mm 2.0000
3 AF-005 MCB 1P 2- 16 A 2.0000
5 AF-016 Kontaktor 3P, 40 A 1.0000
6 AF-019 Timer Switch type Analog/digital,24 jam 1P 1.0000
7 AF-020 Selector Switch Auto/Manual 1.0000
9 AF-022 KWH meter 1P 20/60 A 1.0000
10 AG-014 Kabel NYAF 16 mm2 5.0000
11 AF-024 OK meter 1 P 1.0000
11 AF-026 Terminal keramik 4P 60 A 1.0000
12 AH-001 Service Wedge Clamp 2.0000
12 AH-004 Tension Bracket 1.0000
13 AH-007 Line tap connector (CCS) 35/70 mm2 4.0000
14 AI-006 Pipa PVC dia.2" 8.0000
15 AI-008 Knee PVC dia.2" 6.0000
16 AI-009 Sock PVC dia 2" 2.0000
17 AH-010 Stainless Steel Strip 3.0000
18 AH-011 Yokes/Stoping Buckle 3.0000
19 AH-012 Link 6.0000
20 AI-004 Gembok 1.0000
21 AI-010 Asesoris 1.0000
Jumlah Tenaga Ke
X EA-015 Pemasangan Grounding Panel Kontrol PJU 1.0000
Tenaga Kerja
1 BA-001 Mandor/Tenaga Ahli Listrik 0.1000
2 BA-007 Tukang Listrik 0.2000
3 BA-009 Pembantu Tukang Listrik 0.4000
Bahan
1 AI-011 Kabel BC 16 mm2 3.0000
2 AI-012 Grounding Rod 16 mm2 1.0000
3 AI-013 Kabel schoon 16 mm2 2.0000
4 AI-014 Pipa GIV. dia. 2" 3.0000
5 AH-010 Stainless Steel Strip 2.0000
5 AH-011 Yokes/Stoping Buckle 2.0000
6 AH-012 Link 2.0000
Jumlah Tenaga Ke
Bahan
1 AI-012 Grounding Rod 16 mm2 1.0000
2 AI-016 Kabel BC 6 mm2 1.5000
3 AI-017 Kabel schoon 6 mm2 1.0000
Jumlah Tenaga Ke
Bahan
1 AI-014 Pipa GIV. dia. 2" 1.0500
2 AI-005 Angkur 22 mm 0.5000
3 AJ-010 Kawat Duri 1.2500
4 AI-010 Asesoris 0.0300
Bahan
1 AI-006 Pipa PVC dia.2" 1.0500
2 AI-010 Asesoris 0.0300
ATUAN
Jumlah Harga
Sat. Harga Satuan
Satuan
titik 55,878.00
oh 175,000.00 1,750.00
oh 150,000.00 2,985.00
oh 150,000.00 5,970.00
oh 125,000.00 9,950.00
hari 1,650,000.00 32,835.00
hari 120,000.00 2,388.00
Jumlah 55,878.00
Pembulatan 55,878.00
titik 41,288.00
oh 175,000.00 875.00
oh 150,000.00 1,500.00
oh 150,000.00 3,000.00
oh 125,000.00 4,937.50
hari 1,650,000.00 28,875.00
hari 120,000.00 2,100.00
Jumlah 41,287.50
Pembulatan 41,288.00
titik 26,333.00
oh 150,000.00 5,000.00
oh 125,000.00 8,333.33
hari 75,000.00 5,000.00
hari 120,000.00 8,000.00
Jumlah 26,333.33
Pembulatan 26,333.00
oh 175,000.00 875.00
oh 150,000.00 1,500.00
oh 125,000.00 2,500.00
oh 150,000.00 3,000.00
hari 450,000.00 9,000.00
hari 120,000.00 2,400.00
Jumlah Upah 19,275.00
m3 135,000.00 4,050.00
bh 750.00 5,357.14
Jumlah Bahan 9,407.14
Jumlah Upah+Bahan 28,682.14
Pembulatan 28,682.00
m1 306,614.00
oh 175,000.00 17,500.00
oh 150,000.00 30,000.00
oh 100,000.00 60,000.00
hari 120,000.00 72,000.00
Jumlah 179,500.00
kg 25,500.00 45,900.00
M3 375,000.00 37,500.00
M3 215,000.00 21,500.00
M3 180,000.00 9,000.00
hari 250,000.00 8,928.57
hari 120,000.00 4,285.71
Jumlah 127,114.29
Jumlah Tenaga Kerja dan Bahan 306,614.29
Pembulatan 306,614.00
m3 163,500.00 163,500.00
oh 175,000.00 17,500.00
oh 150,000.00 30,000.00
oh 100,000.00 60,000.00
hari 250,000.00 50,000.00
hari 120,000.00 6,000.00
Jumlah 163,500.00
Pembulatan 163,500.00
oh 175,000.00 8,750.00
oh 150,000.00 15,000.00
oh 125,000.00 25,000.00
Jumlah Tenaga Kerja 48,750.00
bh 778,000.00 778,000.00
bh 75,000.00 150,000.00
bh 50,400.00 100,800.00
bh 504,000.00 504,000.00
bh 476,000.00 476,000.00
bh 95,200.00 95,200.00
bh 616,000.00 616,000.00
mtr 28,000.00 140,000.00
bh 84,000.00 84,000.00
bh 56,000.00 56,000.00
bh 4,500.00 9,000.00
bh 22,000.00 22,000.00
bh 27,000.00 108,000.00
mtr 16,000.00 128,000.00
bh 10,000.00 60,000.00
bh 7,500.00 15,000.00
mtr 12,000.00 36,000.00
bh 2,350.00 7,050.00
bh 2,000.00 12,000.00
bh 55,000.00 55,000.00
ls 450,000.00 450,000.00
Jumlah Bahan 3,902,050.00
Jumlah Tenaga Kerja dan Bahan 3,950,800.00
Dibulatkan 3,950,800.00
oh 175,000.00 17,500.00
oh 150,000.00 30,000.00
oh 125,000.00 50,000.00
Jumlah 97,500.00
oh 175,000.00 8,750.00
oh 150,000.00 15,000.00
oh 125,000.00 25,000.00
Jumlah 48,750.00
bh 225,000.00 225,000.00
mtr 10,750.00 16,125.00
bh 3,500.00 3,500.00
Jumlah 244,625.00
Jumlah Tenaga Kerja dan Bahan 293,375.00
Dibulatkan 293,375.00
oh 175,000.00 875.00
oh 150,000.00 1,500.00
oh 125,000.00 2,500.00
hari 120,000.00 2,400.00
Jumlah Upah 7,275.00
3,345,000.00
13,791,465.00
2,073,180.00