REKAPITULASI
PEKERJAAN ARSITEKTUR
2.a Unit -
2.b Unit 1.00
2.c Unit 1.00
2.d Unit 1.00
2.e Unit -
2.f Unit -
3
5
5.a Unit 4.00
REKAPITULASI
A PEKERJAAN PANEL
B PEKERJAAN KABEL FEEDER + KONTROL PEKERJAAN KABEL INSTALASI
C PEKERJAAN LAMPU, SAKLAR & STOP KONTAK PEKERJAAN PENYALUR PETIR DAN
D GROUNDING SYSTEM
E
PEKERJAAN ELEKTRIKAL
A PEKERJAAN PANEL
1 Panel PP.RD2 Unit 1.00
- Panel uk. 400x300x150 mm cat powder coating, tebal 2 mm bh 1.00
Incoming :
- MCB 1P 16 A bh 1.00
Outgoing :
- MCB 1P 4A 6KA bh 7.00
- Accesorries Lot 1.00
2 Lot
1.00
Bh 7.00
4 Lot
1.00
2 Lot 1.00
III A REKAPITULASI
PEKERJAAN MEKANIKAL BANGUNAN RUMAH DINAS TYPE 45 PEKERJAAN PLUMBING
JUMLAH PEKERJAAN MEKANIKAL BANGUNAN RUMAH DINAS TYPE 45
m' 8.00
m' 7.00
m' -
m' 2.00
Bh 1.00
Bh 1.00
4 Lot 1.00
REKAPITULASI
PEKERJAAN BANGUNAN RUMAH DINAS TYPE 45 PEKERJAAN STRUKTUR
PEKERJAAN ARSITEKTUR PEKERJAAN MEKANIKAL PEKERJAAN ELEKTRIKAL
I II III
IV
I REKAPITULASI
AB PEKERJAAN STRUKTUR BANGUNAN RUMAH DINAS TYPE 45 PEKERJAAN PONDASI
CD PEKERJAAN STRUKTUR BAWAH PEKERJAAN STRUKTUR ATAS PEKERJAAN STRUKTUR
EF RANGKA ATAP
PEKERJAAN WATERPROOFING & SCREEDING PEKERJAAN PERSIAPAN
JUMLAH PEKERJAAN STRUKTUR BANGUNAN RUMAH DINAS TYPE 45
HARGA SAT JUMLAH HARGA
( Rp. ) ( Rp. )
NO. URAIAN PEKERJAAN SAT. VOLUME
PEKERJAAN STRUKTUR
PEKERJAAN PONDASI
A Pondasi Batu Kali
1
- Pekerjaan Galian Tanah T = 1.3 m m³ 33.20
- Tanah Padat m² 41.50
- Pasir Urug, T= 100 mm m³ 4.20
- Pasangan Batu Kali m³ 17.40
- Urugan Kembali m³ 11.80