Anda di halaman 1dari 33

RENCANA ANGGARAN BIAYA (RAB)

TERMIN 1 40%

KEGIATAN : DAK FISIK BIDANG PENDIDIKAN KABUPATEN SUBANG

PEKERJAAN: PEMBANGUNAN RUANG KELAS BARU


SMP N 1 CIPEUNDEUY

VOLUME : 1 LS

LOKASI : DESA CIPEUNDEUY


KECAMATAN CIPEUNDEUY
KABUPATEN SUBANG

HARGA SUB
No. URAIAN PEKERJAAN VOLUME SATUAN JUMLAH JUMLAH
( Rp. ) ( Rp. ) ( Rp. )
1 2 3 4 5 6
I. PEKERJAAN PERSIAPAN
1 Pek. Pemb. papan nama proyek 1.00 bh 250,000.00 250,000.00
2 Biaya dokumentasi 1.00 ls 220,000.00 220,000.00
1 Pek. Bouplank 36.00 m1 55,037.18 1,981,338.48
2 Pek.Galian Tanah 9.00 m3 90,860.00 817,740.00
3 Pek. Urugan tanah kembali 2.25 m3 25,628.80 57,664.80
3,326,743.28
III. PEKERJAAN PONDASI & BETON
1 Pek. Aantasamping Batu Kali 1.80 m3 512,788.99
### 923,020.18
2 Pek. Pondasi Batu Kali 7.88 m3 855,784.38 6,739,301.99
3 Pek. Sloof beton 15 /20 cm K. 175 1.35 m3 6,199,814.42 8,369,749.46
4 Pek. Kolom beton 20 /20 cm K. 175 1.26 m4 7,029,336.75 8,856,964.31
5 Pek. Ring balk beton 12/18 cm K. 175 0.69 m5 6,014,146.16 4,156,977.83
6 Pek. Ring balk beton Ampig 12/15 cm K. 175 0.36 m6 6,014,146.16 2,165,092.62
7 Pek. Kolom Selasar 20 /25 cm K. 175 0.18 m7 7,029,336.75 1,230,133.93
8 Pek. Balok Gantung Selasar 20 /25 cm K. 175 0.64 m7 6,014,146.16 3,834,018.18
9 Pek. Kolom beton Ampig 15/15 cm K. 175 0.06 m7 7,029,336.75 425,134.29
36,700,392.79
IV. PEKERJAAN KUSEN PINTU & JENDELA
1 Pek. Kusen kayu klas II 1.45 m3 8,281,228.18 12,013,412.10
12,013,412.10
V. PEKERJAAN DINDING & PLESTERAN
1 Pek. Dinding bata merah lokal 1 : 5 ( tebal 1/2 165.85 m2 127,528.42 21,150,588.46
2 Pek. Plesteran 1 : 5 t. 20 mm 145.00 m2 96,838.42 14,041,570.90
35,192,159.36
1 2 3 4 5 6

R E K A P I T U L A S I

I. PEKERJAAN PERSIAPAN Rp. 3,326,743.28


III. PEKERJAAN PONDASI & BETON Rp. 36,700,392.79
IV. PEKERJAAN KUSEN PINTU & JENDELA Rp. 12,013,412.10
V. PEKERJAAN DINDING & PLESTERAN Rp. 35,192,159.36
TOTAL BIAYA Rp. 87,232,707.53

PEMBULATAN 78,000,000.00
TERBILANG : TUJUH PULUH DELAPAN JUTA RUPIAH
Subang, ……………….. 2019
Menyetujui Menyetujui Dibuat Oleh
Kepala Sekolah Ketua Tim Pelaksana Tim Teknis

KUKUN KOSWARA, S.Pd YADI ISPRIYADI, S.Pd ATE LESMANA, ST


NIP. 19681119 1990002 1 001 NIP. 19721006 199903 1 007

Mengetahui :
Plt. KEPALA DINAS PENDIDIKAN DAN KEBUDAYAAN

Drs. H. E. KUSDINAR, M.Pd


NIP. 19591226 198109 1 001
RENCANA ANGGARAN BIAYA (RAB)

KEGIATAN : DAK FISIK BIDANG PENDIDIKAN KABUPATEN SUBANG

PEKERJAAN : REHABILITASI RUANGKANTOR BESERTA PERABOTNYA


SMP N 2 CIJAMBE

VOLUME : 1 RUANG

LOKASI : DESA BANTARSARI


KECAMATAN CIJAMBE
KABUPATEN SUBANG

HARGA SUB
No. URAIAN PEKERJAAN VOLUME SATUAN JUMLAH JUMLAH
( Rp. ) ( Rp. ) ( Rp. )
1 2 3 4 5 6

I. PEKERJAAN PERSIAPAN

1 Pek. Pemb. papan nama proyek 1.00 bh 250,000.00 250,000.00


2 Biaya dokumentasi 1.00 ls 565,000.00 565,000.00
1 Pek. Bongkaran 3.00 m1 1,000,000.00 3,000,000.00
3,815,000.00
II PEKERJAAN KUSEN PINTU & JENDELA

1 Pek. Kusen kayu klas II 1.51 m3 8,281,228.18 12,521,217.01


2 Pek. Daun pintu panel kayu klas II 16.00 m2 741,993.63 11,871,898.08
3 Pek. Daun jendela kaca rangka kayu klas II 15.00 m2 555,042.18 8,325,632.70
4 Pek. Kaca polos 3 mm 21.03 m2 102,083.62 2,146,818.53
5 Pek. Kunci tanam ( setara TESSA ) 5.00 bh 197,459.09 987,295.45
6 Pek. Engsel pintu ( setara union ) 5.00 stl 58,146.82 290,734.10
7 Pek. Engsel jendela ( setara union ) 20.00 stl 40,582.73 811,654.60
8 Pek. Hak angin 20.00 bh 29,673.64 593,472.80
9 Pek. Slot tanam jendela 20.00 bh 29,673.64 593,472.80 38,142,196.07

III PEKERJAAN DINDING & PLESTERAN

1 Pek. Dinding bata merah lokal 1 : 5 ( tebal 1/2 bat 14.00 m2 127,528.42 1,785,397.88
2 Pek. Plesteran 1 : 5 t. 20 mm 39.20 m2 96,838.42 3,796,066.06
3 Pek. keramik dinding 15.00 M2 151,151.25 2,267,268.75
7,848,732.69
IV PEKERJAAN ATAP & RANGKA

1 Pek. Kuda-kuda Kayu 2.11 m3 5,635,650.91 11,902,494.72


2 Pek. rangka atap 378.00 m2 115,763.55 43,758,620.18
3 Pek. Atap genteng 75.60 m2 85,900.78 6,494,098.76
3 Pek. Bubung genteng 30.00 m' 80,611.78 2,418,353.40
4 Pek. Listplank GRC 1/20 cm 90.00 m' 90,503.23 8,145,290.70 72,718,857.76

V PEKERJAAN PLAPOND + RANGKA

1 Pek. Plapond GRC + rangka kayu klas II 296.47 m2 197,857.24 58,658,852.33


2 Pek. list plafond profil m' 19,516.34 0.00 58,658,852.33

VI PEKERJAAN LANTAI
1 Pek. Urugan peninggian m3 260,759.58 0.00
2 Pek. lantai kerja beton tumbuk bawah kramik m3 1,041,539.58 0.00
3 Pek. lantai rabat beton 1.70 m3 1,041,539.58 1,770,617.29
4 Pek. Pek wermest m 6 m3 117,901.50 0.00
5 Pek. Lantai keramik warna 30/30 cm ( setara muli 378.00 m2 141,980.00 53,668,440.00 55,439,057.29

VII PEKERJAAN ELEKTRIKAL

1 Pek. Titik cahaya + kabel NYM 2 x 1,5 mm 8.00 ttk 112,545.46 900,363.68
2 Pek. Stop kontak ( setara broco ) + kabel NYM 4.00 bh 85,272.73 341,090.92
3 Pek. Lampu SL 20 watt ( setara philip ) 8.00 bh 59,500.00 476,000.00
4 Pek. Box Panel MCB 1.00 ls 380,000.00 380,000.00
5 Pek. Penyambungan 1.00 ls 500,000.00 500,000.00 2,597,454.60
1 2 3 4 5 6

VIII PEKERJAAN PENGECATAN

1 Pek. Cat dinding baru 2x ( setara metrolit ) 182.54 m2 22,077.67 4,030,057.88


2 Pek. Cat plapond baru 3x ( setara metrolit ) 88.20 m2 38,962.90 3,436,527.78
3 Pek. Cat muka kayu baru 3x ( setara glotek ) 85.52 m2 48,217.11 4,123,334.38 11,589,920.04

IX PEKERJAAN PERABOT RUANG KELAS


1 Meja 2 buah 750,000.00 1,500,000.00
2 Kursi 2 buah 250,000.00 500,000.00
3 Lemari Buku 2 buah 1,750,000.00 3,500,000.00
4 Rak buku 2 buah 2,105,000.00 4,210,000.00
5 Meja Dan Kursi Siswa 2 buah 500,000.00 1,000,000.00
10,710,000.00
X PEKERJAAN LAIN -LAIN
1 Prasasti 1 buah 350,000.00 350,000.00 350,000.00

R E K A P I T U L A S I

I. PEKERJAAN PERSIAPAN Rp. 3,815,000.00


II PEKERJAAN KUSEN PINTU & JENDELA Rp. 38,142,196.07
III PEKERJAAN DINDING & PLESTERAN Rp. 7,848,732.69
IV PEKERJAAN ATAP & RANGKA Rp. 72,718,857.76
V PEKERJAAN PLAPOND + RANGKA Rp. 58,658,852.33
VI PEKERJAAN LANTAI Rp. 55,439,057.29
VII PEKERJAAN ELEKTRIKAL Rp. 2,597,454.60
VIII PEKERJAAN PENGECATAN Rp. 11,589,920.04
JUMLAH BIAYA KONSTRUKSI Rp. 250,810,070.78
XIIII PEKERJAAN PERABOT RUANG KELAS Rp. 10,710,000.00
XIIII PEKERJAAN LAIN -LAIN Rp. 350,000.00
TOTAL BIAYA Rp. 261,870,070.78

TOTAL BIAYA Rp. 261,870,000.00

PEMBULATAN 261,870,000.00

TERBILANG : DUA RATUS ENAM PULUH SATU JUTA DELAPAN RATUS TUJUH PULUH RIBU RUPIAH

Menyetujui Dibuat
Kepala Sekolah Ketua Tim Pelaksana

KUKUN KOSWARA, S.Pd YADI ISPRIYADI, S.Pd


NIP. 19681119 1990002 1 001 NIP. 19721006 199903 1 007

Mengetahui : Di periksa
Plt. KEPALA DINAS PENDIDIKAN DAN KEBUDAYAAN Tim Teknis

Drs. H. E. KUSDINAR, M.Pd ATE LESMANA, ST


NIP. 19591226 198109 1 001
DAFTAR HARGA SATUAN PEKERJAAN

KEGIATAN : DAK FISIK BIDANG PENDIDIKAN KABUPATEN SUBANG

PEKERJAAN : REHABILITASI RUANGKANTOR BESERTA PERABOTNYA


SMP N 2 CIJAMBE

VOLUME : 1 RUANG

LOKASI : DESA BANTARSARI


KECAMATAN CIJAMBE
KABUPATEN SUBANG

NO. URAIAN HARGA SATUAN

1 2 3

I. PEKERJAAN PERSIAPAN

1 1 bh Pek. Pemb. papan nama proyek Rp. 250,000.00


2 1 ### ### #NAME? Rp. 55,037.18
3 1 ls Biaya dokumentasi Rp. 500,000.00
4 1 m2 Pek. Bongkaran genteng penutup atap Rp. 20,537.00
5 1 m2 Pek. Rangka atap Rp. 15,336.75
6 1 m3 Pek. Bongkaran kuda-kuda Rp. 1,315,820.00
7 1 m2 Pek. Bongkaran rangka penutup plapond Rp. 18,278.15
8 1 m3 Pek. Bongkaran beton bertulang Rp. 822,793.40
9 1 m2 Pek. Bongkaran plesteran Rp. 9,240.00
10 1 m2 Pek. Bongkaran pasangan bata merah Rp. 17,278.80
11 1 m2 Pek. Bongkaran Keramik Rp. 19,747.20

### ###

1 1 ### ### #NAME? Rp. 90,860.00


2 1 ### ### #NAME? Rp. 25,628.80
3 1 ### ### #NAME? Rp. 195,542.70

### ###

1 1 ### ### #NAME? Rp. 260,759.58


2 1 ### ### #NAME? Rp. 512,788.99
3 1 ### ### #NAME? Rp. 855,784.38
4 1 ### ### #NAME? Rp. 127,528.42
5 1 ### ### #NAME? Rp. 6,199,814.42
6 1 ### ### #NAME? Rp. 7,029,336.75
7 1 ### ### #NAME? Rp. 8,227,491.71
8 1 ### ### #NAME? Rp. 8,227,491.71
9 1 ### ### #NAME? Rp. 8,227,491.71
10 1 ### ### #NAME? Rp. 7,453,701.45
11 1 ### ### #NAME? Rp. 6,014,146.16

II PEKERJAAN KUSEN PINTU & JENDELA

1 1 m3 Pek. Kusen kayu klas II Rp. 8,281,228.18


2 1 m2 Pek. Daun pintu panel kayu klas II Rp. 741,993.63
3 1 m2 Pek. Daun jendela kaca rangka kayu klas II Rp. 555,042.18
4 1 m2 Pek. Kaca polos 3 mm Rp. 102,083.62
5 1 bh Pek. Kunci tanam ( setara TESSA ) Rp. 197,459.09
6 1 stl Pek. Engsel pintu ( setara union ) Rp. 58,146.82
7 1 stl Pek. Engsel jendela ( setara union ) Rp. 40,582.73
8 1 bh Pek. Hak angin Rp. 29,673.64
9 1 bh Pek. Slot tanam jendela Rp. 29,673.64

III PEKERJAAN DINDING & PLESTERAN

1 1 m2 Pek. Dinding bata merah lokal 1 : 5 ( tebal 1/2 bata ) Rp. 127,528.42
2 1 m2 Pek. Plesteran 1 : 5 t. 20 mm Rp. 96,838.42

IV PEKERJAAN ATAP & RANGKA

1 1 m3 Pek. Kuda-kuda Kayu Rp. 126,039.83


2 1 m2 Pek. Atap genteng Rp. 85,900.78
3 1 m' Pek. Bubung genteng Rp. 80,611.78
4 1 m' Pek. Listplank GRC 1/20 cm Rp. 90,503.23
1 2 3

V PEKERJAAN PLAPOND + RANGKA

1 1 m2 Pek. Plapond GRC + rangka kayu klas II Rp. 197,857.24


2 1 m' Pek. list plafond profil Rp. 19,516.34

VI PEKERJAAN LANTAI

1 1 ### ### #NAME? Rp. 260,759.58


2 1 m2 Pek. Lantai keramik warna 30/30 cm ( setara mulia ) Rp. 141,980.00
3 1 ### ### #NAME? Rp. 1,041,539.58

VII PEKERJAAN ELEKTRIKAL

1 1 ttk Pek. Titik cahaya + kabel NYM 2 x 1,5 mm Rp. 112,545.46


2 1 bh Pek. Stop kontak ( setara broco ) + kabel NYM 3X1,5 mm Rp. 85,272.73
3 1 bh Pek. Lampu SL 20 watt ( setara philip ) Rp. 59,500.00
4 1 ls Pek. Penyambungan Rp. 500,000.00

VIII PEKERJAAN PENGECATAN

1 1 m2 Pek. Cat dinding baru 2x ( setara metrolit ) Rp. 22,077.67


2 1 m2 Pek. Cat plapond baru 3x ( setara metrolit ) Rp. 38,962.90
3 1 m2 Pek. Cat muka kayu baru 3x ( setara glotek ) Rp. 48,217.11
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

KEGIATAN : DAK FISIK BIDANG PENDIDIKAN KABUPATEN SUBANG

PEKERJAAN : REHABILITASI RUANGKANTOR BESERTA PERABOTNYA


SMP N 2 CIJAMBE

VOLUME : 1 RUANG

LOKASI : DESA BANTARSARI


KECAMATAN CIJAMBE
KABUPATEN SUBANG

HARGA
NO. URAIAN KOEF SATUAN SATUAN JUMLAH
( Rp. ) ( Rp. )
1 2 3 4 5 6=(3X5)
1 1M2 BONGKAR GENTENG PENUTUP ATAP
Pekerja 0.0500 org 116,600.00 5,830.00
Tukang Kayu 0.1000 org 133,100.00 13,310.00
Kepala Tukang Kayu 0.0100 org 139,700.00 1,397.00
Mandor 0.0100 org 136,400.00 20,537.00
Keuntungan 10%
Jumlah 20,537.00
2 1M2 BONGKAR RANGKA ATAP + RENG KASO
Pekerja 0.1000 org 116,600.00 11,660.00
Tukang Kayu 0.0250 org 133,100.00 3,327.50
Kepala Tukang 0.0025 org 139,700.00 349.25
Mandor 0.0050 org 136,400.00 15,336.75
Keuntungan 10%
Jumlah 15,336.75
3 1M3 BONGKAR KUDA - KUDA
Pekerja 6.0000 org 116,600.00 699,600.00
Mandor 4.0000 org 133,100.00 532,400.00
Kepala Tukang 0.6000 org 139,700.00 83,820.00
Mandor 0.2000 org 136,400.00 1,315,820.00
Keuntungan 10%
Jumlah 1,315,820.00
4 1M2 BONGKAR RANGKA & PENUTUP PLAFOND
Pekerja 0.1000 org 116,600.00 11,660.00
Tukang Kayu 0.0450 org 133,100.00 5,989.50
Kepala Tukang 0.0045 org 139,700.00 628.65
Mandor 0.0075 org 136,400.00 18,278.15
Keuntungan 10%
Jumlah 18,278.15
5 1M3 BONGKARAN BETON BERTULANG
Pekerja 6.6670 org 116,600.00 777,372.20
Mandor 0.3330 org 136,400.00 45,421.20
Jumlah 822,793.40
Keuntungan 10%
Jumlah 822,793.40
6 1M2 BONGKAR PLESTERAN DINDING
Pekerja 0.0500 org 116,600.00 5,830.00
Mandor 0.0250 org 136,400.00 3,410.00
Keuntungan 10%
Jumlah 9,240.00
7 1M2 BONGKARAN DINDING BATA MERAH
Pekerja 0.1400 org 116,600.00 16,324.00
Mandor 0.0070 org 136,400.00 954.80
Keuntungan 10%
Jumlah 17,278.80
8 1M2 BONGKAR LANTAI KERAMIK
Pekerja 0.1600 org 116,600.00 18,656.00
Mandor 0.0080 org 136,400.00 1,091.20
Keuntungan 10%
Jumlah 19,747.20
9 1 M' PEK. PAS. BOUWPLANK
Kayu albasiah 0.0120 m3 2,345,454.55 28,145.45
Paku 5-7 0.0200 kg 19,636.36 392.73
Pekerja 0.1000 org 116,600.00 11,660.00
Tukang kayu terampil 0.1000 org 127,600.00 12,760.00
Kepala tukang kayu 0.0100 org 139,700.00 1,397.00
Mandor 0.0050 org 136,400.00 682.00
Jumlah 55,037.18
Keuntungan 10%
1 2 3 4 5 6=(3X5)
Jumlah 55,037.18
1 2 3 4 5 6=(3X5)
10 1 M3 PEK. GALIAN TANAH BIASA MAX KEDALALAM 1 M'
Alat bantu 0.0500 ls 0.00 0.00
Tukang gali 0.7500 org 116,600.00 87,450.00
Mandor 0.0250 org 136,400.00 3,410.00
Jumlah 90,860.00
Keuntungan 10%
Jumlah 90,860.00
11 1 M3 PEK. URUGAN KEMBALI PONDASI DIHITUNG 1/4 DARI GALIAN
Alat bantu 0.1000 ls 6,500.00 650.00
Tukang gali 0.1920 org 116,600.00 22,387.20
Mandor 0.0190 org 136,400.00 2,591.60
Jumlah 25,628.80
Keuntungan 10%
Jumlah 25,628.80
12 1 M3 PEK. URUGAN TANAH PENINGGIAN
Tanah merah 1.2000 m3 129,915.58 155,898.70
Pekerja terampil 0.3000 org 127,600.00 38,280.00
Mandor 0.0100 org 136,400.00 1,364.00
Jumlah 195,542.70
Keuntungan 10%
Jumlah 195,542.70
13 1 M3 PEK. URUGAN PASIR URUG
Pasir urug 1.2000 m3 187,012.99 224,415.58
Pekerja 0.3000 org 116,600.00 34,980.00
Mandor 0.0100 org 136,400.00 1,364.00
Jumlah 260,759.58
Keuntungan 10%
Jumlah 260,759.58
14 1 M3 PAS. ANSTAMPING BATU KALI
Batu belah 1.2000 m3 233,766.23 280,519.48
Pasir urug 0.4320 m3 187,012.99 80,789.61
Pekerja 0.7800 org 116,600.00 90,948.00
Tukang batu setengah terampil 0.3900 org 127,600.00 49,764.00
Kepala tukang batu 0.0390 org 139,700.00 5,448.30
Mandor 0.0390 org 136,400.00 5,319.60
Jumlah 512,788.99
Keuntungan 10%
Jumlah 512,788.99
13 1 M3 PAS. LANTAI KERJA ( BETON TUMBUK ) 1 PC : 3 PS : 5 KRL
Semen portland 197.8000 kg 1,221.82 241,675.64
Pasir beton 0.5500 m3 315,584.42 173,571.43
Batu pecah tangan 2/3 cm 0.9300 m3 315,584.42 293,493.51
Peralatan 0.0750 lot 366,000.00 27,450.00
Pekerja 2.0000 org 116,600.00 233,200.00
Tukang batu setengah terampil 0.5000 org 127,600.00 63,800.00
Kepala tukang batu 0.0500 org 139,700.00 6,985.00
Mandor 0.0100 org 136,400.00 1,364.00
Jumlah 1,041,539.58
Keuntungan 10%
Jumlah 1,041,539.58
1 2 3 4 5 6=(3X5)
14 1 M3 PAS. BATU KALI / BATU BELAH 1 : 5
Batu kali / batu belah 1.2000 m3 233,766.23 280,519.48
Semen portland 136.0000 kg 1,221.82 166,167.27
Pasir pasang 0.5440 m3 216,525.97 117,790.13
Pekerja 1.5000 org 116,600.00 174,900.00
Tukang batu setengah terampil 0.7500 org 127,600.00 95,700.00
Kepala tukang batu 0.0750 org 139,700.00 10,477.50
Mandor 0.0750 org 136,400.00 10,230.00
Jumlah 855,784.38
Keuntungan 10%
Jumlah 855,784.38
15 1 M2 PAS. BATA MERAH LOKAL TEBAL 1/2 BATU CAMPURAN 1 : 5
Bata merah lokal 70.0000 bh 763.64 53,454.55
Semen portland 9.6800 kg 1,221.82 11,827.20
Pasir pasang 0.0450 m3 216,525.97 9,743.67
Pekerja setengah terampil 0.3000 org 121,000.00 36,300.00
Tukang batu setengah terampil 0.1000 org 127,600.00 12,760.00
Kepala tukang batu 0.0100 org 139,700.00 1,397.00
Mandor 0.0150 org 136,400.00 2,046.00
Jumlah 127,528.42
Keuntungan 10%
Jumlah 127,528.42
16 1 M2 PAS. PLESTERAN DINDING 1 : 5 + ACIAN TEBAL 20 MM
Semen portland 6.9120 kg 1,221.82 8,445.21
Pasir pasang 0.0350 m3 216,525.97 7,578.41
Pekerja setengah terampil 0.4000 org 121,000.00 48,400.00
Tukang batu terampil 0.2000 org 133,100.00 26,620.00
Kepala tukang batu 0.0200 org 139,700.00 2,794.00
Mandor 0.0220 org 136,400.00 3,000.80
Jumlah 96,838.42
Keuntungan 10%
Jumlah 96,838.42
17 1 M3 KUSEN KAYU KLAS II
Kayu balok Klas II 1.1000 m3 3,818,181.82 4,200,000.00
Paku 1.2500 kg 19,636.36 24,545.45
Lem putih ( setara Fox ) 1.0000 kg 27,272.73 27,272.73
Pekerja terampil 7.0000 org 127,600.00 893,200.00
Tukang kayu terampil 21.0000 org 133,100.00 2,795,100.00
Kepala tukang kayu 2.1000 org 139,700.00 293,370.00
Mandor 0.3500 org 136,400.00 47,740.00
Jumlah 8,281,228.18
Keuntungan 10%
Jumlah 8,281,228.18
18 1 M2 DAUN PINTU PANEL KAYU KLAS II
Rangka + panel kayu klas II 0.0400 m3 3,818,181.82 152,727.27
Lem putih ( setara Fox ) 0.5000 kg 27,272.73 13,636.36
Pekerja terampil 1.0000 org 127,600.00 127,600.00
Tukang kayu terampil 3.0000 org 133,100.00 399,300.00
Kepala tukang kayu 0.3000 org 139,700.00 41,910.00
Mandor 0.0500 org 136,400.00 6,820.00
Jumlah 741,993.63
Keuntungan 10%
Jumlah 741,993.63
19 1 M2 DAUN JENDELA KACA ( TANPA KACA ) RANGKA KAYU KLAS II
Rangka kayu klas II 0.0240 m3 3,818,181.82 91,636.36
Lem putih ( setara Fox ) 0.3000 kg 27,272.73 8,181.82
Pekerja setengah terampil 0.8000 org 121,000.00 96,800.00
Tukang kayu terampil 2.4000 org 133,100.00 319,440.00
Kepala tukang kayu 0.2400 org 139,700.00 33,528.00
Mandor 0.0400 org 136,400.00 5,456.00
Jumlah 555,042.18
Keuntungan 10%
Jumlah 555,042.18
20 1 M2 PASANG RANGKA ATAP BAJA RINGAN ZINCALUM
Main Truss C 75/0.75 2.8500 M' 16,363.64 46,636.36
Roof bottom/ Reng 33/0,45 3.4000 M' 8,181.82 27,818.18
Screww Drilling (Truss) dia.6 x 20 mm 5.4000 bh 818.18 4,418.18
Screww Drilling (Root batten) dia.4 x 10 mm 8.0000 bh 545.45 4,363.64
Dinabolt dia.12 x 120 mm 1.0000 bh 1,636.36 1,636.36
Alat bantu (15%) 0.1500 LS 13,000.00 1,950.00
Pekerja 0.1200 org 116,600.00 13,992.00
Tukang Besi profil 0.1800 org 127,600.00 22,968.00
Kepala Tukang Besi 0.0180 org 139,700.00 2,514.60
Mandor 0.0018 org 136,400.00 245.52
Jumlah 126,542.84
1 2 3 4 5 6=(3X5)
Keuntungan maksimal 10% 12,654.28
Jumlah 139,197.12
1 2 3 4 5 6=(3X5)
21 1 M2 PEK. ATAP GENTENG METAL BERPASIR ( SETARA TARAROOF )
Genting metal berpasir ( setara Tararoof ) t. 0,35 mm 1.0200 m2 57,272.73 58,418.18
Paku anti karat 0.2000 kg 27,272.73 5,454.55
Tukang kayu terampil 0.0175 org 133,100.00 2,329.25
Kepala tukang kayu 0.008 org 139,700.00 1,117.60
Pekerja 0.15 org 116,600.00 17,490.00
Mandor 0.008 org 136,400.00 1,091.20
Jumlah 85,900.78
Keuntungan 10%
Jumlah 85,900.78
1 2 3 4 5 6=(3X5)
22 1 M' PEK. BUBUNGAN GENTENG METAL BERPASIR ( SETARA TARAROOF )
Genteng bubung metal berpasir ( setara tararoof ) 1.1000 m' 38,181.82 42,000.00
Paku skrup 3,5" 6.0000 bh 1,636.36 9,818.18
Pekerja 0.0840 org 116,600.00 9,794.40
Tukang kayu terampil 0.1250 org 133,100.00 16,637.50
Kepala tukang kayu 0.0130 org 139,700.00 1,816.10
Mandor 0.0040 org 136,400.00 545.60
Jumlah 80,611.78
Keuntungan 10%
Jumlah 80,611.78
23 1 M2 PENGECATAN DINDING BARU 2X ( SETARA METROLIT )
Cat tembok ( setara metrolit ) 0.1167 kg 22,254.55 2,596.37
Plamur tembok 0.1600 kg 38,181.82 6,109.09
Rol cat 0.0067 bh 32,727.27 218.18
Steger werk 0.0300 lot 19,000.00 570.00
Hampelas 0.3333 bh 8,727.27 2,909.09
Pekerja setengah terampil 0.0280 org 121,000.00 3,388.00
Tukang cat setengah terampil 0.0420 org 127,600.00 5,359.20
Kepala tukang cat 0.0042 org 139,700.00 586.74
Mandor 0.0025 org 136,400.00 341.00
Jumlah 22,077.67
Keuntungan 10%
Jumlah 22,077.67
24 1 M2 PENGECATAN PLAPOND BARU 2X ( SETARA METROLIT )
Cat tembok ( setara metrolit ) 0.1333 kg 22,254.55 2,967.27
Plamur tembok 0.1600 kg 38,181.82 6,109.09
Rol cat 0.0067 bh 32,727.27 218.18
Steger werk 0.6667 lot 20,000.00 13,333.33
Hampelas 0.3333 bh 8,727.27 2,909.09
Pekerja setengah terampil 0.0280 org 121,000.00 3,388.00
Tukang cat setengah terampil 0.0420 org 127,600.00 5,359.20
Kepala tukang cat 0.0042 org 139,700.00 586.74
Mandor 0.0300 org 136,400.00 4,092.00
Jumlah 38,962.90
Keuntungan 10%
Jumlah 38,962.90
25 1 M2 PENGECATAN KAYU BARU ( 3X ) BERIKUT MENI ( SETARA GLOTEK )
Meni kayu 0.1333 kg 28,363.64 3,781.81
Plamour kayu 0.1500 kg 57,818.18 8,672.73
Cat dasar 0.1133 kg 60,000.00 6,800.00
Cat kayu ( setara glotek ) 0.2600 kg 60,000.00 15,600.00
Hamplas kayu 0.2000 bh 8,727.27 1,745.45
Minyak cat terpentin 0.0200 lt 32,727.27 654.55
Kwas 3" 0.0067 bh 7,090.91 47.27
Pekerja setengah terampil 0.0700 org 121,000.00 8,470.00
Tukang cat terampil 0.0090 org 133,100.00 1,197.90
Kepala tukang cat 0.0060 org 139,700.00 838.20
Mandor 0.0030 org 136,400.00 409.20
Jumlah 48,217.11
Keuntungan 10%
Jumlah 48,217.11
26 1 BH PAS. KUNCI TANAM ( SETARA TESSA )
Kunci tanam ( setara tessa ) 1.0000 bh 130,909.09 130,909.09
Tukang kayu terampil 0.5000 org 133,100.00 66,550.00
Jumlah 197,459.09
Keuntungan 10%
Jumlah 197,459.09
27 1 BH PAS. ENGSEL PINTU ( SETARA UNION )
Engsel pintu ( setara union ) 1.0000 stl 38,181.82 38,181.82
Tukang kayu terampil 0.1500 org 133,100.00 19,965.00
Jumlah 58,146.82
Keuntungan 10%
Jumlah 58,146.82
28 1 BH PAS. ENGSEL JENDELA ( SETARA UNION )
Engsel jendela ( setara union ) 1.0000 stl 27,272.73 27,272.73
Tukang kayu terampil 0.1000 org 133,100.00 13,310.00
Jumlah 40,582.73
Keuntungan 10%
Jumlah 40,582.73
29 1 BH PAS. KAIT ANGIN
kait angin 1.0000 stl 16,363.64 16,363.64
Tukang kayu terampil 0.1000 org 133,100.00 13,310.00
Jumlah 29,673.64
Keuntungan 10%
Jumlah 29,673.64
30 I M2 PAS. KACA POLOS TEBAL 3 MM
Kaca polos 3 mm 1.1000 m2 70,909.09 78,000.00
1 2 3 4 5 6=(3X5)
Tukang kayu terampil 0.1500 org 133,100.00 19,965.00
Pekerja terampil 0.0150 org 127,600.00 1,914.00
Kepala tukang kayu 0.0150 org 139,700.00 2,095.50
Mandor 0.0008 org 136,400.00 109.12
Jumlah 102,083.62
Keuntungan 10%
Jumlah 102,083.62
31 1 M3 COR BETON SITE MIX K.175
Semen portland 326.0000 kg 1,221.82 398,312.73
Pasir beton 0.5429 m3 315,584.42 171,330.78
Batu pecah tangan 2/3 cm 0.5717 m3 315,584.42 180,419.61
Peralatan 1.0000 lot 200,000.00 200,000.00
Pekerja 1.6500 org 116,600.00 192,390.00
Tukang batu setengah terampil 0.2750 org 127,600.00 35,090.00
Kepala tukang batu 0.0280 org 139,700.00 3,911.60
Mandor 0.0830 org 136,400.00 11,321.20
Jumlah 1,192,775.92
Keuntungan 10%
Jumlah 1,192,775.92
32 PEMBESIAN 1 KG DENGAN BESI POLOS/ULIR
Besi beton rata-rata 1.0500 kg 11,060.61 11,613.64
Kawat beton 0.0150 kg 21,818.18 327.27
Tukang besi beton setengah terampil 0.0070 org 127,600.00 893.20
Tukang besi beton terampil 0.0070 org 133,100.00 931.70
Kepala tukang besi beton 0.0007 org 139,700.00 97.79
Mandor 0.0004 org 136,400.00 54.56
Jumlah 13,918.16
Keuntungan 10%
Jumlah 13,918.16
33 1 M2 BEKISTING DENGAN PAPAN
Papan kayu albasiah (dihitung 2x pakai) 0.0450 m3 2,345,454.55 105,545.45
Paku 0.3000 kg 19,636.36 5,890.91
Pekerja 0.5200 org 116,600.00 60,632.00
Tukang kayu setengah terampil 0.2600 org 127,600.00 33,176.00
Kepala tukang kayu 0.0260 org 139,700.00 3,632.20
Mandor 0.0260 org 136,400.00 3,546.40
Jumlah 212,422.96
Keuntungan 10%
Jumlah 212,422.96
34 1 BH TITIK CAHAYA ( KABEL 2 X 2,5 MM )
Kabel NYM 2 x 2,5 mm 9.0000 m' 5,454.55 49,090.91
Saklar tunggal 1.0000 bh 21,818.18 21,818.18
Plapond fiting 1.0000 bh 27,272.73 27,272.73
Pipa instalasi 0.5000 BTG 8,727.27 4,363.64
Upah 1.0000 ls 10,000.00 10,000.00
Jumlah 112,545.46
Keuntungan 10%
Jumlah 112,545.46
35 1 BH STOP KONTAK ( KABEL 3 X 2,5 MM )
Kabel NYM 3 x 2,5 mm 7.5000 m' 6,545.45 49,090.91
Stop kontak 1.0000 bh 21,818.18 21,818.18
Pipa instalasi 0.5000 m' 8,727.27 4,363.64
Upah 1.0000 ls 10,000.00 10,000.00
Jumlah 85,272.73
Keuntungan 10%
Jumlah 85,272.73
36 1 M2 PAS. ONDERLAAGH BATU BELAH T. 20 CM
Pasir pasang 0.1500 m3 216,525.97 32,478.90
Batu belah 0.2500 m3 233,766.23 58,441.56
Pekerja terampil 0.1500 org 127,600.00 19,140.00
Peralatan 0.1200 lot 34,000.00 4,080.00
Jumlah 114,140.46
Keuntungan 10%
Jumlah 114,140.46
1 2 3 4 5 6=(3X5)
37 1 M2 PAS. PLAPOND GRC T. 4 MM 1,2 X 2,4 MM BERIKUT RANGKA KAYU KLAS II
GRC t. 4 mm 1,2 x 2,4 0.3472 lbr 76,363.64 26,513.45
Kaso-kaso klas II, 5/7 cm 0.0140 m3 3,818,181.82 53,454.55
Kayu klas II, 5/10 cm 0.0035 m3 3,818,181.82 13,363.64
Paku 0.2200 kg 19,636.36 4,320.00
Pekerja setengah terampil 0.2800 org 121,000.00 33,880.00
Tukang kayu terampil 0.4000 org 133,100.00 53,240.00
Kepala tukang kayu 0.0800 org 139,700.00 11,176.00
Mandor 0.0140 org 136,400.00 1,909.60
Jumlah 197,857.24
Keuntungan 10%
Jumlah 197,857.24
38 1 M' PEK. LISPLANK GRC 1/20 CM
GRC 1/20, cm 0.4375 lbr 60,000.00 26,250.00
Kaso 5/7 cm kayu klas II 0.0070 m3 3,818,181.82 26,727.27
Paku 0.0100 kg 19,636.36 196.36
Pekerja setengah terampil 0.0700 org 121,000.00 8,470.00
Tukang kayu setengah terampil 0.2000 org 127,600.00 25,520.00
Kepala tukang kayu 0.0200 org 139,700.00 2,794.00
Mandor 0.0040 org 136,400.00 545.60
Jumlah 90,503.23
Keuntungan 10%
Jumlah 90,503.23
39 1 M' LIST LANGIT-LANGIT KAYU PROFIL
List kayu profil 1.0500 m' 5,454.55 5,727.27
Paku 0.0100 Kg 19,636.36 196.36
Pekerja 0.0500 org 116,600.00 5,830.00
Tukang kayu terampil 0.0500 org 133,100.00 6,655.00
Kepala tukang kayu 0.0050 org 139,700.00 698.50
Mandor 0.0030 org 136,400.00 409.20
Jumlah 19,516.34
Keuntungan 10%
Jumlah 19,516.34
40 1 M2 PAS. LANTAI KERAMIK WARNA 30/30 CM ( SETARA MULIA )
Keramik warna 30/30 cm ( setara mulia ) 1.0683 m2 42,545.45 45,451.31
Semen portland 10.0000 kg 1,221.82 12,218.18
Pasir pasang 0.0450 m3 216,525.97 9,743.67
Sement warna 0.0130 kg 1,636.36 21.27
Pekerja 0.2500 org 116,600.00 29,150.00
Tukang batu terampil 0.1250 org 133,100.00 16,637.50
Kepala Tuakng Batu 0.1875 org 139,700.00 26,193.75
Mandor 0.0188 org 136,400.00 2,564.32
Jumlah 141,980.00
Keuntungan 10%
Jumlah 141,980.00
41 1 PASANGAN DINDING KERAMIK , UK. 20 x 25 CM 15.0000
Bahan :
20 Keramik, uk. 20 x 25 cm 20.00 m2 1625 32,500.00
Semen Portland 13.75 kg 1300 17,875.00
Pasir Pasang 0.02 m3 265000 5,830.00
Semen Warna 1.50 kg 13000 19,500.00
Tenaga Kerja : 0.00
Pekerja 0.3 org 116,600.00 34,980.00
Tukang Batu 0.263 org 133,100.00 35,005.30
Kepala Tukang Batu 0.0263 org 139,700.00 3,674.11
Mandor 0.0131 org 136,400.00 1,786.84
Jumlah 151,151.25
Keuntungan maksimal 10%
Jumlah
Dibulatkan
42 1 M2 PAS. FOLDING GATE
Folding gate 1.0000 m2 450,000 450,000.00
Tukang besi konstruksi 1.5000 org 133,100.00 87,750.00
Pekerja 1.0500 org 116,600.00 57,750.00
Kepala tukang besi 0.1050 org 139,700.00 6,825.00
Mandor 0.0052 org 136,400.00 304.20
Jumlah 602,629.20

1 M' PEK. SALURAN GREVEL BETON 1/2 DIA 20 CM + PASANGAN


Galian tanah 0.1500 m3 Rp 90,860 13,629.00
Grevel beton dia 20 cm 1.0000 bh Rp 41,000 41,000.00
Pas. bata merah lokal 1:4 + plesteran 1:4 0.5000 m2 Rp 127,528 63,764.21
Upah kerja 0.3500 ls Rp 19,500 6,825.00
Jumlah 125,218.21
1 M2 PEKERJAAN WIREMESH M8
Wiremesh M8 1.0100 m² 90,000.00 90,900.00
1 2 3 4 5 6=(3X5)
Kawat las 0.1000 kg 35,000.00 3,500.00
Pekerja terampil 0.1000 org 116,600.00 11,660.00
Tukang besi profil setengah trampil 0.0750 org 139,700.00 10,477.50
Mandor 0.0100 org 136,400.00 1,364.00
Rp 117,902
1 M3 KUDA-KUDA KAYU KLAS II
Kayu balok klas II 1.1000 m3 3,818,181.82 Rp 4,200,000
Paku 5.8000 kg 19,636.36 Rp 113,891
Pekerja setengah terampil 3.0000 org 116,600.00 Rp 349,800
Tukang kayu setengah terampil 5.0000 org 127,600.00 Rp 638,000
Kepala tukang kayu 2.0000 org 139,700.00 Rp 279,400
Mandor 0.4000 org 136,400.00 Rp 54,560
Jumlah Rp 5,635,651

1 M2 PEK. RANGKA ATAP GENTENG PELENTONG KAYU KLAS II


Kayu kaso klas II 5/7 cm 0.0168 m3 3,818,181.82 Rp 64,145
Reng kayu klas II 2/3 cm 4.0000 m' 2000 Rp 8,000
Paku 0.2500 kg 19,636.36 Rp 4,909
Pekerja setengah terampil 0.1500 org 116,600.00 Rp 17,490
Tukang kayu terampil 0.1500 org 127,600.00 Rp 19,140
Kepala tukang kayu 0.0100 org 139,700.00 Rp 1,397
Mandor 0.0050 org 136,400.00 Rp 682
Jumlah Rp 115,764
DAFTAR SATUAN UPAH DAN BAHAN

KEGIATAN : DAK FISIK BIDANG PENDIDIKAN KABUPATEN SUBANG

PEKERJAAN : REHABILITASI RUANGKANTOR BESERTA PERABOTNYA


SMP N 2 CIJAMBE

VOLUME : 1 RUANG

LOKASI : DESA BANTARSARI


KECAMATAN CIJAMBE
KABUPATEN SUBANG

No URAIAN HARGA

1 2 3

A. DAFTAR UPAH

1 Pekerja / Tukang gali Rp. 116,600.00 : oh/8jam


2 Pekerja setengah terampil Rp. 121,000.00 : oh/8jam
3 Pekerja terampil Rp. 127,600.00 : oh/8jam
4 Tukang batu setengah terampil Rp. 127,600.00 : oh/8jam
5 Tukang batu terampil Rp. 133,100.00 : oh/8jam
6 Kepala tukang batu Rp. 139,700.00 : oh/8jam
7 Tukang kayu setengah terampil Rp. 127,600.00 : oh/8jam
8 Tukang kayu terampil Rp. 133,100.00 : oh/8jam
9 Kepala tukang kayu Rp. 139,700.00 : oh/8jam
10 Tukang cat/pelitur setengah terampil Rp. 127,600.00 : oh/8jam
11 Tukang cat/pelitur terampil Rp. 133,100.00 : oh/8jam
12 Kepala tukang cat/pelitur Rp. 139,700.00 : oh/8jam
13 Tukang besi beton setengah terampil Rp. 127,600.00 : oh/8jam
14 Tukang besi beton terampil Rp. 133,100.00 : oh/8jam
15 Kepala tukang besi beton Rp. 139,700.00 : oh/8jam
16 Mandor Rp. 136,400.00 : oh/8jam

B. DAFTAR BAHAN BANGUNAN

1 Batu kali / batu belah Rp. 233,766.23 / m3


2 Pasir arug Rp. 187,012.99 / m3
3 Pasir pasang Rp. 216,525.97 / m3
4 Tanah merah Rp. 129,915.58 / m3
5 Pasir beton Rp. 315,584.42 / m3
6 Batu pecah tangan 2/3 cm Rp. 315,584.42 / m3
7 Kayu albasiah Bekisting Rp. 2,345,454.55 / m3
8 Kayu papan klas II 3/30 cm Rp. 3,818,181.82 / m3
9 Kayu balok klas II Rp. 3,818,181.82 / m3
10 List kayu profil 5 cm Rp. 5,454.55 / m'
11 Besi beton polos KS Rp. 11,060.61 / kg
12 Kawat beton Rp. 21,818.18 / kg
13 Paku biasa Rp. 19,636.36 / kg
14 Semen portland Rp. 61,090.91 / kg
15 Semen warna Rp. 1,636.36 / kg
16 Bata merah lokal Rp. 763.64 / bh
17 Main Truss C 75.75, panjang ( 6 m') Rp. 98,181.82 / btg
18 Roof Bottom/ Reng 30/0.45 , panjang ( 6 m') Rp. 49,090.91 / btg
Screww Drilling (Truss) dia.6 x 20 mm Rp. 818.18 BH
Screww Drilling (Root batten) dia.4 x 10 mm Rp. 545.45 BH
Dinabolt dia.12 x 120 mm Rp. 1,636.36 BH
19 Genteng metal berpasir ( setara Tararoof ) t. 0,35 mm Rp. 57,272.73 / M2
20 Bubungan genteng metal berpasir ( setara Tararoof ) Rp. 38,181.82 / m'
21 Kaca polos 3 mm Rp. 70,909.09 / m2
22 Kunci tanam ( setara TESSA ) Rp. 130,909.09 / bh
23 Engsel pintu SKK/ 4"( setara Union ) Rp. 38,181.82 / stl
24 Engsel jendela SKK/ 3" ( setara Union ) Rp. 27,272.73 / stl
25 Kait angin Rp. 16,363.64 / bh
26 Cat kayu ( setara glotek ) Rp. 60,000.00 / kg
27 Cat tembok ( setara metrolit ) Rp. 22,254.55 / kg
28 Meni kayu Rp. 28,363.64 / kg
29 Terpentin Rp. 32,727.27 / lt
30 Plamur tembok Rp. 38,181.82 / kg
31 Plamur kayu Rp. 57,818.18 / kg
32 Rool cat Rp. 32,727.27 / bh
33 hamplas kayu Rp. 8,727.27 / bh
34 koas 3" Rp. 7,090.91 / bh
35 Lem putih ( setara fox ) Rp. 27,272.73 / kg
36 Kabel NYM 2 x 2,5 Rp. 5,454.55 / m'
37 Kabel NYM 3 x 2,5 Rp. 6,545.45 / m'
38 Saklar broco tunggal Rp. 21,818.18 / bh
39 Stop kontak crem Rp. 21,818.18 / bh
40 Plapon fiting broco Rp. 27,272.73 / bh
41 Pipa Instalasi Rp. 8,727.27 / m'
42 Paku skrup 3,5" Rp. 1,636.36 / bh
43 Rangka atap baja ringan Rp. 360,000.00 / m2
44 GRC t. 4 mm 1,2 x 2,4 Rp. 76,363.64 / lbr
45 GRC 1/20, cm Rp. 60,000.00 / lbr
46 Paku anti karat Rp. 27,272.73 / kg
1 2 3

47 Keramik 30/30 cm corak/warna ( setara mulia ) Rp. 42,545.45 / m2


1 Menghitung harga satuan sloof beton bertulang 12 X 18 cm mutu beton K.175
dengan berat besi beton U. 24, 168,97 kg/m3
- Adukan beton ( site Mix K.175 ) Rp. 1,192,775.92 / m3
- Bekisting papan 1 M3 : ( 0.12 X 0.18 ) ( 0.18 X 2) X 0.75 X Rp. 212,422.96 Rp. 2,655,287.00 / m3
- Besi beton U.24, 4 dia 10, dia 8 - 20 = 168.97 KG/M3 X Rp. 13,918.16 Rp. 2,351,751.50 / m3

JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 12 X 18 CM K.175 DGN BERAT BESI 168,97 KG/M3 Rp. 6,199,814.42 / m3

2 Menghitung harga satuan kolom beton 12 X 12 cm mutu beton K.175


dengan berat besi beton U. 24, 228,57 kg/m3
- Adukan beton ( site Mix K.175 ) Rp. 1,192,775.92 / m3
- Bekisting papan ( 1 M3 : ( 0.12 X 0.12 ) ( 0.12 X 2) X 0.75 X Rp. 212,422.96 Rp. 2,655,287.00 / m3
- Besi beton U.24, 4 dia 10, dia 6 - 15 = 228.57 KG/M3 X Rp. 13,918.16 Rp. 3,181,273.83 / m3

JUMLAH HARGA SATUAN KOLOM BETON 12 X 12 CM K.175 DGN BERAT BESI 228,57 KG/M3 Rp. 7,029,336.75 / m3

3 Menghitung harga satuan kolom beton 12 X 18 cm mutu beton K.175


dengan berat besi beton U. 24, 187,47 kg/m3
- Adukan beton ( site Mix K.175 ) Rp. 1,192,775.92 / m3
- Bekisting papan ( 1 M3 : ( 0.12 X 0.18 ) ( 0.12 X 2+ 0.18 X 2) X 0.75 X Rp. 212,422.96 Rp. 4,425,478.33 / m3
- Besi beton U.24, 4 dia 10, dia 6 - 15 = 187.47 KG/M3 X Rp. 13,918.16 Rp. 2,609,237.46 / m3

JUMLAH HARGA SATUAN KOLOM BETON 12 X 18 CM K.175 DGN BERAT BESI 187,47 KG/M3 Rp. 8,227,491.71 / m3

4 Menghitung harga satuan ring balok 12 X 12 cm mutu beton K.175


dengan berat besi beton U. 24, 259,06 kg/m3
- Adukan beton ( site Mix K.175 ) Rp. 1,192,775.92 / m3
- Bekisting papan ( 1 M3 : 0.12 X 0.12 ) ( 0.12 X 2) X 0.75 X Rp. 212,422.96 Rp. 2,655,287.00 / m3
- Besi beton U.24, 4 dia 10, dia 6 - 15 = 259.06 KG/M3 X Rp. 13,918.16 Rp. 3,605,638.53 / m3

JUMLAH HARGA SATUAN RING BALOK 12 X 12 CM K.175 DGN BERAT BESI 259,06 KG/M3 Rp. 7,453,701.45 / m3

5 Menghitung harga satuan ring balok 12 X 18 cm mutu beton K.175


dengan berat besi beton U. 24, 155,63 kg/m3
- Adukan beton ( site Mix K.175 ) Rp. 1,192,775.92 / m3
- Bekisting papan ( 1 M3 : 0.12 X 0.18 ) ( 0.18 X 2) X 0.75 X Rp. 212,422.96 Rp. 2,655,287.00 / m3
- Besi beton U.24, 5 dia 10 = 155.63 KG/M3 X Rp. 13,918.16 Rp. 2,166,083.24 / m3
dia 8 - 15
JUMLAH HARGA SATUAN RING BALOK 12 X 18 CM K.175 DGN BERAT BESI 155,63 KG/M3 Rp. 6,014,146.16 / m3
JADWAL WAKTU PELAKSANAAN PEKERJAAN

PEKERJAAN : REHABILITASI RUANGKANTOR BESERTA PERABOTNYA


SMP N 2 CIJAMBE
LOKASI : DESA BANTARSARI
KECAMATAN CIJAMBE
KABUPATEN SUBANG

WAKTU PELAKSANAAN
BOBOT Minggu Ke
No URAIAN JENIS PEKERJAAN DAN JENIS BAHAN
%
1 2 3 4 5

I. PEKERJAAN PERSIAPAN 1.52 0.51 0.51 0.51


II PEKERJAAN KUSEN PINTU & JENDELA 15.21 5.07 5.07
III PEKERJAAN DINDING & PLESTERAN 3.13 1.04 1.04
IV PEKERJAAN ATAP & RANGKA 28.99 9.66
V PEKERJAAN PLAPOND + RANGKA 23.39
VI PEKERJAAN LANTAI 22.10
VII PEKERJAAN ELEKTRIKAL 1.04
VIII PEKERJAAN PENGECATAN 4.62

TOTAL 100.00
1 JUMLAH BOBOT PER MINGGU 0.51 0.51 0.51 6.11 15.78
2 JUMLAH KUMULATIF 0.51 1.01 1.52 7.63 23.41
0.55 1.63 9.06 2.95 (12.83)
U PELAKSANAAN PEKERJAAN

WAKTU PELAKSANAAN
Minggu Ke
KETERANGAN
6 7 8 9 10 11 12

-
5.07
1.04
9.66 9.66
7.80 7.80 7.80
11.05 11.05
0.52 0.52 -
1.54 1.54 1.54

23.57 17.46 18.85 11.05 2.06 2.06 1.54


46.98 64.44 83.29 94.34 96.40 98.46 100.00
(36.40) (53.86) (56.84) (52.91)

p2s

(…………………………..)
SKETSA PERHITUNGAN VOLUME PEKERJAAN RKB DUA L

NO URAIAN PEKERJAAN SAT

Panjang Lebar Tinggi


1 BONGKAR 1 GENTENG PENUTUP ATAP m2 26.7 11.2
2 BONGKAR 1 RANGKA ATAP + RENG KASO m2 26.7 11.2
3 BONGKAR 1 KUDA - KUDA m3 25 0.12 0.08
4 BONGKAR 1 PLESTERAN DINDING m2 20 3 3
5 BONGKAR 1 M2 LANTAI KERAMIK m3 7.5 9 1
6 1 BONGKARAN BETON BERTULANG m3 51 0.2 0.15
7 1 BONGKARAN DINDING BATA MERAH m3 15 1 3
8 BONGKAR 1 RANGKA & PENUTUP PLAFOND m2 7.5 7 1
9 1 URUGAN SIRTU PADAT UNTUK PENINGGIAN LANTAI BANG m3
10 1 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 PC. : 5 PS. m2 7 0.2
11 1 PLESTERAN DINDING 1 PC. : 5 PS; TEB. 20 MM m2 7 0.2
KUDA KUDA KAYU KELAS 2 M3 40 0.08 0.12
12 1 PASANG RANGKA ATAP BAJA RINGAN, m2 30 12.6 1
13 1 PASANG ATAP METAL ROOF m2 30 12.6 1
14 1 PASANG BUBUNG METAL ROOF m1 30 1 1
15 1 PASANG LISTPLANK GRC 20 CM m1 78 1 1
16 1 PASANG LIST KAYU PROFIL m1 218 1 1
17 MEMASANG 1 PLAFOND GRC BOARD 4 MM m2 30 9.5 1
18 1 PASANG RANGKA LANGIT-LANGIT (60 x 60) CM, KAYU BOR m2 30 9.5 1
19 1 PASANGAN KUSEN PINTU & JENDELA, KAYU BORNEO SUP m3 1 1 1
20 1 PASANGAN DAUN JENDELA TANPA KACA, KAYU BORNEO m2 1 1 1
21 1 PASANGAN DAUN PINTU PANIL, KAYU BORNEO m2 0 1 1
22 1 PASANGAN JALUSI MATI KUSEN, KAYU BORNEO m2 0 1 1
23 1 PASANGAN KACA, T = 5 MM m2 0 1 1
24 1 PASANGAN KACA, T = 3 MM m2 0 1 1
25 1 PASANG KAIT ANGIN bh 0 1 1
26 1PASANG ENGSEL JENDELA Bh 0 1 1
27 1 PASANG ENGSEL PINTU Bh 0 1 1
28 KUNCI TANAM Bh 0 1 1
29 SLOOT TANAM Bh 0 1 1
30 1 ADUKAN BETON TUMBUK LANTAI KERJA CAMP. 1 PC : 3 PS : m3 0 1 1
31 1 PASANGAN LANTAI KERAMIK , UK. 30x 30 CM m2 15 2 1
32 1 PASANGAN DINDING KERAMIK , UK. 20 x 25 CM m2 0 1 1
33 1 PLINT KERAMIK ( 10 X 40 ) CM m2 0 0.1 1
34 1 PENGECATAN BIDANG TEMBOK LAMA, 2X LAPIS CAT PEN m2 89 2 3
35 1 PENGECATAN BIDANG KAYU BARU, 3X LAPIS PENUTUP ( SNI. m2 0 1 1
36 0.17 m2 0 12.9888

Perhitungan Kusen Pintu Single m3 6.8 6.8 0.06 0.15


Kebutuhan bahan m3 m3 7 0.06 0.15
Kosong lubang m2 m2 1 2.5
Perhitungan Kusen Jendela type 2 lubang m2 10 0.06 0.15
Kebutuhan bahan m3 m3 0 10 0.06 0.15
Kosong lubang m2 m2 1.5 1.5
Perhitungan Kusen Jendela type 3 lubang m2

Kebutuhan bahan m3 m3

Kosong lubang m2 m2

Jendela m2 1 2 2 0.7 2
m3 1 2 2 0.7 2
Kaca Jendela m2 0.67 20 0.84

Kaca Mati m2 1.02 0 0.72


Kaca erang -erang m2 0.72 20 0.4
Kaca Erang-erang pintu m2 0.92 2 0.4
Pintu m2 1.98 2 0.82
m3 1.98 0.035 0.82
kolom 20 /20 besi Begel U Ø 12 lantai 2 btg 1 6 0
kolom 20/20 besi Begel U Ø 8 Lantai 2 btg 1 0 0.85
Ring Balok 15/20 besi Begel U Ø 12 btg 1 4
Ring Balok 15/20 besi Begel U Ø 8 btg 1 0.2 0.73
Ring Balok Gantung selasar 15/20 besi Begel U Ø 12 btg 0 4
Ring Balok Gantung selasar 15/20 besi Begel U Ø 8 btg 0 0.2 0.72
Total Besi Ø 10
Total Besi Ø 12 btg

Total Besi Ø 8 btg

7 Bekisting
Balok 20/30 m2 78 1
Balok Gantung 20/40 m2 218 1 2
kolom 25/25 Lantai 2 m2 0 19 2
Kolom Selasar lantai 2 m2 1 2 2
Ring Balok 15/20 m2 1 1 1
Balok Gantung Selasar m2 0 2 1

Mengetahui Disetujui Oleh


Kepala Sekolah
Fasilitator

(.............................)

(..........................)

3.5 5 17.5
3.6
21.1
RJAAN RKB DUA LANTAI

VOLUME

Unit Ruang
1 2 0.86 347.7209302326
1 2 0.86 347.7209302326
1 2 0.48
1 2 360
1 2 135
1 1 1.53
1 1 45
1 2 105
1 2 0
5 2 14
5 4 28
11 4.224
1 1 1 378
1 2 1 378 342.9
1 1 30
1 1 78
1 1 218
1 1 1 285
1 1 1 285
1 2 2
1 2 2
1 2 0
1 2 0
1 2 0
1 2 0
1 2 0
1 2 0
1 2 0
1 2 0
1 2 0
1 2 0
1 1 1 30
1 2 1 0
1 2 1 0
1 1 534
1 1 0
12.9888

5 0.306 1.02 0.612


2 1 0.126
2 1 5
2 5 0.9 0.9
2 5 0.9
2 5 22.5 27.5 1.512
1 5 0
1 5 0
1 5 0
1.4 2 0.08 1 5 2.72
1.4 2 0.03 0.08 1 5 0.0816
1 5 11.256
1 5 0
1 5 5.76
1 5 0.736 47.71824
2 2 12.9888 13.6008
1 2 0.113652
0
0
0.333333
0.304167
0
0
#REF! 7.2 #REF!
#REF! 10.4 #REF!
#REF! 4.7 #REF!
#REF!

2 156
2 234
2 0
2 4
2 2
2 0

Diusulkan Oleh Panitia Pelaksana Sekolah (P2S)

(...........................)

)
I. PEKERJAAN PERSIAPAN

1 Pek. Pemb. papan nama proyek bh


2 Biaya dokumentasi ls

II. PEKERJAAN BONGKARAN

1 m1 9 9
2 m3 36
3 m3 9

III. PEKERJAAN PONDASI & BETON


1 Pek. Aantasamping Batu Kali m3 36
2 Pek. Pondasi Batu Kali m3 45 9
3 Pek. Sloof beton 15 /20 cm K. 175 m3 45
4 Pek. Kolom beton 20 /20 cm K. 175 m3 4 4
5 Pek. Ring balk beton 12/18 cm K. 175 m3 9 9
6 Pek. Ring balk beton Ampig 12/15 cm K. 175 m3 5
7 Pek. Kolom Selasar 20 /25 cm K. 175 m3 1
8 Pek. Balok Gantung Selasar 20 /25 cm K. 175 m3 9 2
9 Pek. Kolom beton Ampig 15/15 cm K. 175 m3 2

IV. PEKERJAAN KUSEN PINTU & JENDELA

1 Pek. Kusen kayu klas II Jendela m3 13.50


Kusen kayu klas II pintu p2 8.40
Kusen kayu klas II pintu 1 7.40
Kusen jalusi 4.00

2 Pek. Daun pintu panel kayu klas II m2 2


3 Pek. Daun jendela kaca rangka kayu klas II m2 0.75
4 Pek. Kaca polos 3 mm kaca mati jendela m2 0.75
erang erang jendela Dan pintu 0.75
Kaca polos 3 mmrangka jendela 0.85

5 Pek. Kunci tanam ( setara TESSA ) bh


6 Pek. Engsel pintu ( setara union ) bh
7 Pek. Engsel jendela ( setara union ) bh
8 Pek. Hak angin bh
9 Pek. Slot tanam jendela bh

V. PEKERJAAN DINDING & PLESTERAN


1 Pek. Dinding bata merah lokal 1 : 5 ( tebal 1/2 bata ) m2 18 18
Ampig

Dinding Selasar etmpat duduk bata penuh 6

2 Pek. Plesteran 1 : 5 t. 20 mm m2 165.85


Plesterankolom dan balok 4 0.9
plesteran dinding rabat 6 0.5

3 Pek. keramik Dinding m2 7.4


VI. PEKERJAAN ATAP & RANGKA

1 Pek. Kuda-kuda +kayu m3 27


2 Pek. Atap genteng metal berpasir m2 6.5
3 Pek. Bubung genteng metal berpasir m1
4 Pek. Listplank GRC 1/20 cm m1 6.5

VII. PEKERJAAN PLAPOND + RANGKA

1 Pek. Plapond GRC + rangka kayu klas II m2 18 9

2 Pek. list plafond profil m1 64 72

VIII. PEKERJAAN LANTAI


1 Pek. Urugan peninggian m3 7
9 2

2 Pek. lantai kerja beton tumbuk bawah kramik m3 18


Pek. lantai rabat beton m3 9 0.8
Pek. were mesh m2
3 Pek. Lantai keramik warna 30/30 cm ( setara mulia ) m2 18

IX. PEKERJAAN POLDING GATE

1 Pek. Polding Gate Besi m2

X. PEKERJAAN ELEKTRIKAL

1 Pek. Titik cahaya + kabel NYM 2 x 1,5 mm bh


2 Pek. Stop kontak ( setara broco ) + kabel NYM 3X1, bh
3 Pek. Lampu SL 20 watt ( setara philip ) bh
4 Pek. Box Panel MCB bh
5 Pek. Penyambungan ls

XI. PEKERJAAN PENGECATAN

1 Pek. Cat dindingtembok m2


2 Pek. Cat plapond baru 3x ( setara metrolit ) m2
3 Pek. Cat muka kayupintu m2 2 2
Cat muka kayu jendela 3.4 2
Cat muka kayu kusen pintu 7 0.27
Cat muka kayu kusenjendela 8 0.27
Cat muka kayu kusen jalusi 4 3.3
jalusi 60 0.5
Cat list plafon 195.6

XII. PEKERJAAN SANITASI


Pek. GREVEL U d 20 m1

XIII PEKERJAAN PERABOT RUANG KELAS


1 Meja Guru bh
2 Kursi Guru bh
3 Lemari Buku bh
4 Meja Siswa Tunggal bh
5 Kursi Siswa bh
6 Papan Tulis/ White Board bh
9 9 36
0.5 0.5 9
0.25 2.25

0.5 0.10 1.8


0.45 0.25 0.35 0.50 7.875
0.15 0.20 1.35
4 3.5 42 0.15 0.20 1.26
7 7 32 0.12 0.18 0.69
4 20 0.12 0.15 0.36
3.5 3.5 0.2 0.25 0.175
2 2 2 17 0.15 0.25 0.6375
2.1 4.2 0.12 0.12 0.06048

0.06 0.14 9 1.02


0.06 0.14 1 0.07
0.06 0.14 4 0.25
0.06 0.14 3.3 0.11
1.45
1.6 5 16
1 20 15
1 9 6.75
0.4 17 5.1
0.6 18 9.18
21.03
1 5
5 5
20 20
20 20
20 20
14 7 57 3.3 4.25 18 22.25 165.85
0
165.85
0.5 2

7 2 324.7
3.3 11.9 13 0.7 9.1 20.98
2
345.68
0.95 7.03

7 189 0.08 0.12 1.8144


2 13 20 260
20 20
4 26 20 2 40 66

1 162 0 9 14.4 176.4

18 41.6 195.6

18 0.1 12.6
18 7 1 7 1 0.1 2.5 1.8 2
15.1
7 0.06 7.56 1.4 2
0.1 1 0.72 7 0.7 0.1 2 0.98 1.7
7 0
9 162

6 6
1 1
6 6
1 1
1 1

2 0.2 66 26.4 7 365.08


176.4
0.8 5 16 1 16
18 0.08 9.792
1.89 1.6 0.42 3 2.016 3.906
9 19.4 5.5 0.42 9 20.79 40.23
0.27 3.564
0.07 2 4.2
0.04 7.824
85.516
3.6

2.8
6.4

Anda mungkin juga menyukai