1. TUJUAN 1. OBJECTIVE
Prosedur ini dibuat untuk pengendalian This procedure is made to control of process
perubahan proses yaitu proses utama dan change that is main process and additional
proses tambahan (subkon) di PT Korindo process (sub cont) at PT Korindo Heavy Industry
Heavy Industry dan site and site
4. REFERENSI 4. REFERENCE
ISO 14001 4.4.1; OHSAS 18001 4.4.1 ISO 14001 4.4.1; OHSAS 18001 4.4.1
Manajemen Perubahan memastikan bahwa Change Management ensure that new process
proses baru sebagai tindakan yang aman dan as safe action dan safe condition
kondisi aman
6. PROSEDUR 6. PROCEDUR
6.2.3 Produktifitas (usia dan jenis kelamin) 6.2.3 Productivity (age and gender)
6.3.1 Manual mesin harus di 6.3.1 Machine manual shall at documents and
dokumentasikan dan be communicated to all operator
dikomunikasikan kepada semua
operator
6.3.2 Operator harus mengikuti training 6.3.2 Operator shall follow training machine
pengoperasian mesin operation
6.4.1 Iklim kerja ( suhu dan factor 6.4.1 Job climate( temperature and factor
lingkungan) environmental)
6.4.2 Lingkungan kerja : man power di 6.4.2 Work condition: man power at looks
sekeliling tempat baru around new place
6.4.3 Diadakan orientasi tempat baru 6.4.3 Arranged by new place orientation
6.5.1 Log book harus diisi oleh shift 6.5.1 Log book shall be filled by previous shift
and acknowledged by next shift about:
No. Dokumen
PT. KORINDO HEAVY INDUSTRY Document No.
HSE-P.24
BALARAJA PLANT Tanggal Terbit
Release Date
01-Apr -2014
No. Revisi
PENGATURAN PERUBAHAN Revision No.
0
CHANGE MANAGEMENT Halaman
No. Revisi
4 dari / of 9
6.5.1.1 Pekerjaan yang belum dan 6.5.1.1 Work that not yet finish and was
sudah selesai sehingga shift finished so next shift to know
berikutnya mengetahui mana which one shall be worked and
yang harus dikerjakan dan which that don't.
mana yang tidak.
6.6.3 Pembuatan JSA yang dilengkapi 6.6.3 Prepare JSA that provided with Risk
dengan penilaian resiko Assessment
7 LAMPIRAN 7 ATTACHMENT