BAHAN TOKO
I SEMEN
1 Semen Tiga Roda Zak 75.000 80.000 85.000
2 Semen Holcim Zak 95.000 115.000 125.000
3 Semen Tonasa Zak 76.000 81.000 86.000
4 Portland cement putih Tiga Toda Zak 95.000 110.000 125.000
5 Semen Warna Putih/PC (40 Kg) Kg 3.270 3.112 3.270
6 Kapur Pasang Kg 5.334 5.271 5.334
7 Air Ltr 500 500 500
II BAHAN BESI DAN KAWAT
1 Besi Beton D 6", 12 m Batang 44.577 44.641 44.958
2 Besi Beton D 8", 12 m Batang 69.977 70.041 70.358
3 Besi Beton D 10", 12 m Batang 100.457 100.521 100.838
4 Besi Beton D 12", 12 m Batang 139.827 139.891 140.208
5 Besi Beton D 14" Batang 171.577 171.641 171.958
6 Besi Beton D 16" Batang 222.377 222.441 222.758
7 Besi Beton D 19" Batang 304.927 304.991 305.308
8 Besi Beton D 21" Batang 444.627 444.691 445.008
9 Besi beton U24 polos Buah 450.000 580.000 610.000
10 Besi beton U24 Ulir Buah 460.000 590.000 615.000
11 Besi siku 60 x 60 x 60 mm Batang 365.000 395.000 420.000
12 Besi siku 50 x 50 x 5 mm Batang 275.000 310.500 365.000
13 Besi siku 50 x 50 x 4 mm Batang 250.000 300.000 360.000
14 Besi siku 20 x 20 mm Batang 40.000 41.200 42.000
15 Besi siku 30 x 30 mm Batang 48.000 49.440 50.400
16 Besi siku 40 x 40 mm Batang 53.000 54.590 55.650
17 Baut/Mur Kg 31.877 31.941 32.131
18 Paku Tripleks Kg 57.277 57.341 57.531
19 Paku Tripleks Uk. 3/4 Ktk 12.000 12.360 12.600
20 Paku Sekrup Dos 20.447 20.511 20.701
21 Paku Kalsiboard/Gypsumboard Kg 44.577 44.641 44.831
22 Paku beton - Kotak 30.000 35.000 42.000
23 Paku belian - Kg 15.000 19.000 22.000
24 Paku biasa - Kg 14.000 17.500 19.000
25 Paku seng - Kg 30.000 35.000 40.000
26 Paku campuran - Kg 15.000 18.000 19.500
27 Paku asbes - Kg 30.000 35.000 39.000
28 Paku jembatan - Kg 30.000 35.000 39.000
29 Paku anti karat utk Genteng metal 35.00 m2/kg Kg 32.500 33.475 34.125
30 Paku GRC Kg 38.350 39.501 40.268
31 Paku sekrup Kg 455 469 478
32 Main trus C 75.75 Panjang 6 m Btg 117.000 120.510 122.850
33 Main trus C 75.80 Panjang 6 m Btg 127.400 131.222 133.770
34 Main trus C 75.100 Panjang 6 m Btg 169.000 174.070 177.450
35 Roof Bottom/Reng 30/0.45 Panjang 6 m Btg 58.500 60.255 61.425
36 Roof Bottom/Reng 33/0.45 Panjang 6 m Btg 67.600 69.628 70.980
37 Screw Drilling dia 4x10 mm Buah 455 469 478
38 Screw Drilling dia 6x20 mm Buah 488 503 512
39 Screw Drilling dia 8x20 mm Buah 650 670 683
40 Screw Drilling dia 12x20 mm Buah 910 937 956
41 Dynabolt 10x60 mm Buah 1.105 1.138 1.160
42 Dynabolt 10x80 mm Buah 1.560 1.607 1.638
43 Dynabolt 12x12 mm Buah 1.950 2.009 2.048
44 Rel handerson lengkap Buah 1,137,500 1,171,625 1,194,375
45 Rel maraton 1 pintu Unit 266.500 274.495 279.825
46 Ramset/Dinabolt Buah 9.750 10.043 10.238
47 Cotton plaster Buah 26.000 26.780 27.300
48 Baut besi 5/8 – 35 cm Batang 10.000 12.000 12.500
49 Baut besi 5/8 – 30 cm Batang 8.000 10.000 11.500
50 Baut besi 5/8 – 25 cm Batang 7.000 9.000 10.000
51 Baut besi 5/8 – 20 cm Batang 6.000 8.000 10.000
52 Baut besi 5/8 – 12 cm Batang 5.000 6.500 8.000
53 Baut besi 1/2 – 35 cm Batang 8.000 10.000 14.500
54 Baut besi 1/2 – 37 cm Batang 7.000 8.500 9.000
55 Baut besi 1/2 – 27 cm Batang 7.000 8.000 8.500
56 Baut besi 1/2 – 25 cm Batang 6.000 7.500 8.000
57 Baut besi 1/2 – 22 cm Batang 5.000 6.000 6.500
58 Baut besi 1/2 – 18 cm Batang 4.000 5.000 6.000
59 Baut besi 1/2 – 15 cm Batang 3.000 3.500 4.500
60 Baut besi 1/2 – 12 cm Batang 3.000 3.500 4.500
61 Baut dia 16 mm Buah 20.000 27.000 31.000
62 Baut dia 12 mm Buah 15.000 16.000 16.500
63 Baut dia 12 mm Buah 18.000 18.500 19.500
64 Baut dia 10 mm Buah 15.000 16.000 16.500
65 Baut dia 10 mm Buah 14.000 15.500 16.000
66 Baut dia 80 mm Buah 13.000 15.000 15.500
67 Besi beton biasa (polos) Uk. 6 mm x 12 m Kg 220.000 275.000 300.000
68 Besi beton ulir Uk. 16 mm x 12 m Kg 255.000 290.000 320.000
69 Besi beton ulir Uk. 19 mm x 12 m Kg 130.000 145.000 175.000
70 Besi kanal UNP-3” Batang 450.000 500.000 650.000
71 Kawat anyam - Rol 800.000 900.000 1,000,000
72 Kawat Beton (Material) - Kg 20.000 35.000 40.000
73 Kawat Beronjong 2 mm (No 14) Kg 30.000 45.000 48.000
74 Kawat Bendrat (RRT) Kg 17.009 17.519 17.859
75 Kawat Bendrat (RRT) Roll 435.500 448.565 457.275
76 Kawat kassa / Harmonika Uk. 2.0x2.0 dia 2 m2 22.750 23.433 23.888
77 Kawat kassa / Harmonika Uk. 3.0x3.0 dia 2 m2 24.310 25.039 25.526
78 Kawat kassa / Harmonika Uk. 4.0x4.0 dia 2 m2 31.200 32.136 32.760
79 Kawat seng galvanis Uk. 3 mm Kg 26.260 27.048 27.573
80 Kawat seng galvanis Uk. 4 mm Kg 29.250 30.128 30.713
81 Kawat seng galvanis Uk. 5 mm Kg 32.500 33.475 34.125
BEHEL
82 Kawat 6 tbl 4,2 mm ™ btg 21.000 21.630 22.050
83 Kawat 6 tbl 4,8 mm ™ btg 26.600 27.398 27.930
84 Kawat 6 tbl 5,8 mm ™ btg 35.000 36.050 36.750
85 Kawat 6 tbl 6,8 mm ™ btg 42.000 43.260 44.100
Uk. 8
86 Besi 8 JI btg 49.000 50.470 51.450
87 Besi 8 KS btg 67.200 69.216 70.560
88 Besi 8 TI btg 61.600 63.448 64.680
Uk. 10
89 Besi 10 KS btg 100.800 103.824 105.840
90 Besi 10 TI btg 95.200 98.056 99.960
91 Besi 10 JI btg 77.000 79.310 80.850
Uk. 12
92 Besi 12 KS btg 145.600 149.968 152.880
93 Besi 12 TI btg 135.800 139.874 142.590
94 Besi 12 KSJI btg 98.000 100.940 102.900
Uk. 13 Ulir
95 Besi 13 Ulir TI btg 163.800 168.714 171.990
96 Besi 13 Ulir TW btg 151.200 155.736 158.760
Uk. 16 Ulir
97 Besi 16 KXII (14,6 mm) btg 203.000 209.090 213.150
98 Besi 16 TI btg 252.000 259.560 264.600
99 Besi 16 TW Toleransi 0.4 btg 222.600 229.278 233.730
100 Besi 16 Ulir KS Cilegon btg 261.800 269.654 274.890
Uk. 16 Polos
101 Besi 16mm KS btg 252.000 259.560 264.600
102 Besi 16mm JI btg 205.800 211.974 216.090
Uk. 19 Ulir
103 Besi 19 Ulir TI btg 369.600 380.688 388.080
104 Plate Strip T. 5s/d12, L. Kg 12.880 13.266 13.524
105 Plate Strip T. 6s/d12, L. 100 Kg 12.880 13.266 13.524
106 Besi Baja WF (Wide Flange) WF 100x50x5x7 Kg 12.133 12.497 12.740
107 Besi Baja WF (Wide Flange) WF 125x60x6x8 Kg 17.160 17.675 18.018
108 Besi Baja WF (Wide Flange) WF 148x100x6x9 Kg 27.430 28.253 28.802
109 Besi Baja WF (Wide Flange) WF 150x75x5x7 Kg 18.200 18.746 19.110
110 Besi Baja WF (Wide Flange) WF 175x90x5x8 Kg 23.530 24.236 24.707
111 Besi Baja WF (Wide Flange) WF 198x99x4,5x7 Kg 23.660 24.370 24.843
112 Besi Baja WF (Wide Flange) WF Kg 15.492 15.957 16.267
113 Besi Baja WF (Wide Flange) WF Kg 27.733 28.565 29.120
114 Besi Baja WF (Wide Flange) WF 248x124x5x8 Kg 33.410 34.412 35.081
115 Besi Baja WF (Wide Flange) WF 250x125x6x9 Kg 38.480 39.634 40.404
116 Besi Baja WF (Wide Flange) WF 298x149x6x8 Kg 41.600 42.848 43.680
117 Besi Baja WF (Wide Flange) WF Kg 47.710 49.141 50.096
118 Besi Baja WF (Wide Flange) WF 346x174x6x9 Kg 53.842 55.457 56.534
119 Besi Baja WF (Wide Flange) WF 350x175x7x11 Kg 64.480 66.414 67.704
120 Besi Baja WF (Wide Flange) WF 396x199x7x11 Kg 73.613 75.821 77.293
121 Besi Baja WF (Wide Flange) WF 400x200x8x13 Kg 85.800 88.374 90.090
122 Besi Baja WF (Wide Flange) WF 446x199x8x12 Kg 86.060 88.642 90.363
123 Besi Baja WF (Wide Flange) WF 450x200x9x14 Kg 98.800 101.764 103.740
124 Besi Baja WF (Wide Flange) WF Kg 116.458 119.952 122.281
125 Besi Baja WF (Wide Flange) WF Kg 196.300 202.189 206.115
126 Besi Baja WF (Wide Flange) WF Kg 137.800 141.934 144.690
154 Aluminium profil uk.3"-4.00 m (bahan kusen) ex. ALEXINDO Btg 338.000 348.140 354.900
155 Natural
Aluminium profil uk.3"-4.00 m (bahan kusen) ex. SUPEREX Btg 468.000 482.040 491.400
156 Aluminium profil uk.3"-4.00 m (bahan kusen) Natural
ex. EDICO Warna Btg 260.000 267.800 273.000
157 Aluminium profil uk.3"-4.00 m (bahan kusen) ex. ALCO Warnal Btg 351.000 361.530 368.550
158 Aluminium profil uk.3"-4.00 m (bahan kusen) ex. ALEXINDO Btg 377.000 388.310 395.850
159 Aluminium profil uk.3"-4.00 m (bahan kusen) Warna
ex. SUPEREX Warna Btg 507.000 522.210 532.350
160 Aluminium profil uk.4"-4.00 m (bahan kusen) ex. EDICO Natural Btg 253.500 261.105 266.175
161 Aluminium profil uk.4"-4.00 m (bahan kusen) ex. ALCO Natural Btg 364.000 374.920 382.200
162 Aluminium profil uk.4"-4.00 m (bahan kusen) ex. ALEXINDO Btg 442.000 455.260 464.100
163 Aluminium profil uk.4"-4.00 m (bahan kusen) Natural
ex. SUPEREX Btg 624.000 642.720 655.200
164 Natural
Aluminium profil uk.4"-4.00 m (bahan kusen) ex. EDICO Warna Btg 292.500 301.275 307.125
165 Aluminium profil uk.4"-4.00 m (bahan kusen) ex. ALCO Warnal Btg 409.500 421.785 429.975
166 Aluminium profil uk.4"-4.00 m (bahan kusen) ex. ALEXINDO Btg 481.000 495.430 505.050
167 Warna
Aluminium profil uk.4"-4.00 m (bahan kusen) ex. SUPEREX Warna Btg 663.000 682.890 696.150
168 Aluminium profil uk.3"-4.00 m (bahan kusen) ex. YKK Natural Btg 247.000 254.410 259.350
169 Aluminium profil uk.4"-4.00 m (bahan kusen) ex. YKK Natural Btg 416.000 428.480 436.800
170 Aluminium profil uk.3"-4.00 m (bahan kusen) ex. YKK Warna Btg 288.600 297.258 303.030
171 Aluminium profil uk.4"-4.00 m (bahan kusen) ex. YKK Warna Btg 463.775 477.688 486.964
172 Aluminium strip 6 mm m2 130.000 133.900 136.500
173 Aluminium strip 8 mm m2 136.500 140.595 143.325
174 Aluminium profil "T" -4.00 m (bahan rangka Btg 78.000 80.340 81.900
175 plafond)
Profil daun jendela aluminium strrip Lebar 8 cm m' 136.500 140.595 143.325
176 Profil daun jendela aluminium strrip Lebar 10 cm m' 143.000 147.290 150.150
177 Aluminium foil uk. 120x50 cm roll 494.000 508.820 518.700
178 Aluminium foil (double)
uk. 120x50 cm roll 364.000 374.920 382.200
179 Panel Sunscreen Aluminium Coloubond (single)
- m2 127.075 130.887 133.429
180 Pintu Aluminium - m2 390.000 401.700 409.500
181 Rolling door biasa Girl aluminium m2 186.875 192.481 196.219
182 Rolling door biasa Selat aluminium m2 224.250 230.978 235.463
183 Rolling door biasa One sheet m2 164.450 169.384 172.673
184 Handle Aluminium m2 455.000 468.650 477.750
185 Karet acsesoris kusen/pintu aluminium m2 9.750 10.043 10.238
186 Jalusi aluminium m2 45.500 46.865 47.775
187 Sun screen aluminium m2 501.150 516.185 526.208
188 Plat Beton berongga Type 120.05.12 m2 211.575 217.922 222.154
189 Plat Beton berongga Type 120.05.14 m2 221.793 228.447 232.883
190 Plat Beton berongga Type 120.05.16 m2 232.050 239.012 243.653
191 Plat Beton berongga Type 150.05.12 m2 232.050 239.012 243.653
192 Plat Beton berongga Type 150.05.14 m2 242.255 249.523 254.368
193 Plat Beton berongga Type 150.05.16 m2 252.525 260.101 265.151
194 Plat Beton berongga Type 150.05.18 m2 262.691 270.572 275.826
195 Plat Beton berongga Type 150.07.12 m2 267.410 275.432 280.781
196 Plat Beton berongga Type 150.07.14 m2 289.445 298.128 303.917
197 Plat Beton berongga Type 150.07.16 m2 311.480 320.824 327.054
198 Plat Beton berongga Type 200.05.12 m2 243.815 251.129 256.006
199 Plat Beton berongga Type 200.05.14 m2 254.085 261.708 266.789
200 Plat Beton berongga Type 200.05.16 m2 264.290 272.219 277.505
201 Plat Beton berongga Type 200.05.18 m2 274.495 282.730 288.220
202 Plat Beton berongga Type 200.07.12 m2 279.240 287.617 293.202
203 Plate Beton Berongga Type 200.07.14 M2 301,275 310.313 325.829
204 Plate Beton Berongga Type 200.07.16 M2 323,310 333.009 349.660
205 Plate Beton Berongga Type 200.07.18 M2 345,280 355.638 373.420
206 Plate Beton Berongga Type 250.07.12 M2 301,275 310.313 325.829
207 Plate Beton Berongga Type 250.07.14 M2 323,310 333.009 349.660
208 Plate Beton Berongga Type 250.07.16 M2 345,280 355.638 373.420
209 Plate Beton Berongga Type 250.07.18 M2 367,380 378.401 397.321
210 Panel Dinding Beton Berongga Type 100.05.8 M2 211.575 211.575 222.154
211 Half SLAB Type 80.05.5 M2 140.010 144.210 151.421
212 H-BEAM 260 Btg 190.385 196.097 205.901
213 H-BEAM 300 Btg 220.220 226.827 238.168
214 H-BEAM 340 Btg 250.120 257.624 270.505
215 H-BEAM 360 Btg 265.070 273.022 286.673
216 H-BEAM 380 Btg 280.020 288.421 302.842
217 H-BEAM 420 Btg 309.920 319.218 335.178
218 Tiang Pancang (PILE) TRIPLE 28 (D16) M" 119.600 123.188 129.347
219 Tiang Pancang (PILE) TRIPLE 32 (D19) M" 147.875 152.311 159.927
220 Tiang Pancang (PILE) TRIPLE 28 (D13) M" 105.430 108.593 114.023
221 Tiang Pancang (PILE) TRIPLE 32 (D16) M" 140.010 144.210 151.421
222 Tiang Pancang (PILE) TRIPLE 20 (D13) M" 114.855 118.301 124.216
223 Tiang Pancang (PILE) TRIPLE 25 (D16) M" 182.520 187.996 197.395
224 Mob/Demob. Dalam Kota Unit 3,028,025 3,118,866 3,274,809
225 Beton Ready Mix K-175 M3 645.775 665.148 698.406
226 Beton Ready Mix K-225 M3 691.473 712.217 747.828
227 Beton Ready Mix K-275 M3 710.525 731.841 768.433
228 Asphalt Bitumen Kg 17.550 18.077 18.980
229 Asphalt Emulsi Kg 17.550 18.077 18.980
230 Asphalt Curah Kg 16.250 16.738 17.574
231 Asphalt Conoreate/Laston AC-WC Ton 1,820,650 1,875,270 1,969,033
232 Asphalt Threated Base ATB Ton 1,755,000 1,807,650 1,898,033
233 Lataston Hot Rolls Sheet HRS Ton 2,405,000 2,477,150 2,601,008
234 Saringan pasir uk. 55 Rol 200.000 250.000 320.000
235 Paku besi 1,5 @ 20 kg Duss 30.000 35.000 40.000
236 Tangga Aluminium Indalex 2 m pcs 600.000 618.000 630.000
237 Tangga Aluminium Indalex 1,43 m pcs 440.000 453.200 462.000
III BAHAN KERAMIK
1 Keramik Lantai Roman putih m2 120.900 124.527 126.945
2 Keramik Lantai Roman putih m2 123.500 127.205 129.675
3 Keramik Lantai Roman putih m2 133.900 137.917 140.595
4 Keramik Lantai Roman putih m2 211.900 218.257 222.495
5 Keramik Lantai Mulya putih m2 46.800 48.204 49.140
6 Keramik Lantai Mulya putih m2 55.900 57.577 58.695
7 Keramik Lantai Mulya putih m2 62.400 64.272 65.520
8 Keramik Lantai Mulya motif m2 71.500 73.645 75.075
9 Keramik lantai Mosaik 30x30, ex. Lokal m2 45.500 46.865 47.775
10 Keramik Dinding Roman putih m2 42.250 43.518 44.363
11 Keramik Dinding Mulya putih m2 63.700 65.611 66.885
12 Keramik Dinding Roman corak m2 50.700 52.221 53.235
13 Keramik Dinding Roman corak m2 52.650 54.230 55.283
14 Keramik Dinding Mulya corak m2 63.050 64.942 66.203
15 Keramik Dinding Mulya corak m2 44.200 45.526 46.410
16 Ubin PC. Abu-abu 20x20 cm Buah 1.300 1.339 1.365
17 Ubin PC. Abu-abu 30x30 cm Buah 1.950 2.009 2.048
18 Ubin PC. Abu-abu 40x40 cm Buah 3.250 3.348 3.413
19 Ubin PC. Warna 20x20 cm Buah 1.950 2.009 2.048
20 Ubin PC. Warna 30x30 cm Buah 2.600 2.678 2.730
21 Ubin PC. Warna 40x40 cm Buah 4.550 4.687 4.778
22 Ubin plint abu-abu 15x20 cm Buah 1.300 1.339 1.365
23 Ubin plint abu-abu 10x30 cm Buah 1.625 1.674 1.706
24 Ubin plint abu-abu 10x40 cm Buah 1.950 2.009 2.048
25 Lantai Marmer Citatah Uk. 15/30 m2 84.500 87.035 88.725
26 Lantai Marmer Citatah Uk. 20/30 m2 97.500 100.425 102.375
27 Lantai Marmer Citatah Uk. 30/30 m2 110.500 113.815 116.025
28 Lantai Marmer Citatah Uk. 40/40 m2 175.500 180.765 184.275
29 Lantai Marmer Citatah Uk. 60/60 m2 214.500 220.935 225.225
30 Lantai parquet motif jati Uk. 1.2x5.0x25.00 m2 114.400 117.832 120.120
31 Lantai parquet motif jati Uk. 1.2x5.0x30.00 m2 123.500 127.205 129.675
Flooring Jati m2
32 Uk. 455.000 468.650 477.750
Flooring Dedan 1.50x9.0x60/90- m2
33 Uk. 104.000 107.120 109.200
Lantai Kayu HDM 105.00 cm
1.50x9.0x60/75/9 m2
34 ex. Germany uk. 318.500 328.055 334.425
0.00 cm
18.50x118.40x7.0
0 cm
35 Lem Kayu utk HDM 1 tube/10.00 m2 Tube 84.500 87.035 88.725
36 Nitro Granite Surface Matt Ocra m2 193.700 199.511 203.385
37 Nitro Granite Surface Matt Pearl m2 219.700 226.291 230.685
38 Nitro Granite Surface Matt m2 219.700 226.291 230.685
39 Nitro Granite Surface Matt m2 245.700 253.071 257.985
40 Nitro Granite Surface Matt coal m2 271.700 279.851 285.285
41 Nitro Granite Surface lappato m2 271.700 279.851 285.285
42 Nitro Granite Surface lappato m2 297.700 306.631 312.585
43 Nitro Granite Surface lappato m2 297.700 306.631 312.585
44 Nitro Granite shade 60x60
Surface lappato m2 323.700 333.411 339.885
45 Nitro Granite laterite
Surface40x40
lappato coal m2 349.700 360.191 367.185
46 Nitro Granite 60x60
Surface matt snow m2 325.000 334.750 341.250
47 Nitro Granite 40x40
Surface matt ivory m2 325.000 334.750 341.250
48 Nitro Granite 30x60 matt foggy
Surface m2 325.000 334.750 341.250
49 Nitro Granite 60x60
Surface matt m2 234.000 241.020 245.700
Nitro Granite blizzard matt
30x60 m2
50 Surface bora, 234.000 241.020 245.700
51 Nitro Granite fohn, kosawa,
Surface matt beige m2 325.000 334.750 341.250
Nitro Granite mistral
30x60 60x60 m2
52 Surface matt brown, 325.000 334.750 341.250
53 Nitro Granite black, grey
Surface lappato m2 364.000 374.920 382.200
Nitro Granite 60x60
beige 30x60 m2
54 Surface lappato 364.000 374.920 382.200
Nitro Granite brown, black, grey m2
55 Surface structured 244.400 251.732 256.620
Nitro Granite 60x60
bianco m2
56 Surface30x60
structured 364.000 374.920 382.200
Nitro Granite marrone,treasure,
nero grigio m2
57 Surface 364.000 374.920 382.200
60x60
antique, heritage
58 Granite Lainnya Impero 40x40 m2 149.500 153.985 156.975
mystery 15x60
59 Granite Lainnya Granito 40x40 m2 256.100 263.783 268.905
60 Granite Lainnya Granito 30x60 m2 507.650 522.880 533.033
61 Granite Lainnya Inesa 40x40 m2 176.800 182.104 185.640
62 Granite Lainnya Nirogranit 40x40 m2 186.550 192.147 195.878
63 Granite Lainnya Nirogranit 30x60 m2 359.450 370.234 377.423
64 Granite Lainnya Essenza 40x40 m2 436.150 449.235 457.958
65 Granite Lainnya Essenza 40x40 m2 546.650 563.050 573.983
66 Lantai Vinil karet 30x30 Lbr 4.550 4.687 4.778
67 Lantai Vinil motif kembang 30x30 Lbr 5.850 6.026 6.143
68 Kaansteen Uk. 6x15x40 Buah 3.900 4.017 4.095
69 Kaansteen Uk. 10x20x40 Buah 4.875 5.021 5.119
70 Kaansteen Uk. 15x40x60 Buah 21.450 22.094 22.523
71 Kaansteen Uk. 17x28x60 Buah 17.550 18.077 18.428
IV BAHAN KACA
1 Kaca Bening Uk. 3 mm. M2 97.500 100.425 102.375
2 Kaca Bening Uk. 5 mm. M2 104.000 107.120 109.200
3 Kaca Bening Uk. 8 mm. M2 188.500 194.155 197.925
4 Kaca Buram Uk. 3 mm. M2 81.250 83.688 85.313
5 Kaca Buram Uk. 5 mm. M2 107.250 110.468 112.613
6 Kaca Buram Uk. 12 mm. M2 585.000 602.550 614.250
7 Kaca Reyband Uk. 3 mm. M2 109.850 113.146 115.343
8 Kaca Reyband Uk. 5 mm. M2 152.100 156.663 159.705
9 Kaca Es Uk. 3 mm. M2 58.500 60.255 61.425
10 Kaca Es Uk. 5 mm. M2 97.500 100.425 102.375
11 Kaca Tempered Uk. 5 mm. M2 390.000 401.700 409.500
12 Kaca Tempered Uk. 6 mm. M2 455.000 468.650 477.750
13 Kaca Tempered Uk. 8 mm. M2 585.000 602.550 614.250
14 Kaca Tempered Uk. 10 mm. M2 715.000 736.450 750.750
15 Kaca Tempered Uk. 12 mm. M2 975.000 1,004,250 1,023,750
16 List Karet Kaca - m' 3.900 4.017 4.095
V BAHAN LANGIT-LANGIT
1 Triplek 2 mm (122x244 Lembar 57.785 58.420 59.055
2 Triplek Cm)
3 mm (122x244 Lembar 70.485 71.120 71.755
3 Triplek Cm)
4 mm 122x244 Lbr 72.800 74.984 76.440
4 Triplek 6 mm 122x244 Lbr 93.600 96.408 98.280
5 Triplek 9 mm 122x244 Lbr 132.600 136.578 139.230
6 Triplek 12 mm 122x244 Lbr 192.400 198.172 202.020
7 Triplek 15 mm 122x244 Lbr 243.100 250.393 255.255
8 Triplek 18 mm 122x244 Lbr 292.500 301.275 307.125
9 Multiplek 9 mm1,20x2,40 Lbr 202.800 208.884 212.940
10 Multiplek 12 mm1,20x2,40 Lbr 210.500 216.815 221.025
11 Multiplek 15 mm1,20x2,40 Lbr 247.000 254.410 259.350
12 Multiplek 18 mm1,20x2,40 Lbr 273.000 281.190 286.650
13 Teakwod 3 mm 120x24 Lbr 137.549 141.676 144.427
14 Teakwod 3mm 120x140 Uk. Lbr 98.250 101.198 103.163
15 Teakwod Pintu
4mm 120x240 Lbr 170.299 175.408 178.814
16 Teakwod Uk. Pintu 4 mm Lbr 111.349 114.689 116.916
17 Vynil Kayu Kg 85.150 87.705 89.408
18 Playwood 18 mm Lbr 334.048 344.069 350.750
19 Blocboard 18 mm 122x244 Lbr 279.500 287.885 293.475
20 Teakblock 18 mm 122x244 Lbr 370.500 381.615 389.025
21 Polywood Cap Kunci 3 mm Lbr 110.500 113.815 116.025
22 Teakwood 122x244
3 mm 122x244 Lbr 111.800 115.154 117.390
23 Melamin Dico Lembar 95.885 96.520 97.155
24 Melamin 4 mm, Uk. Lembar 71.500 73.645 75.075
25 Partikel Board 1,20x2,40
Uk. 1,20x2,40 Lembar 110.500 113.815 116.025
26 Soft Board Uk. 1,20x2,40 Lembar 52.000 53.560 54.600
27 Formika putih polos Uk. 1,20x2,40 Lembar 117.000 120.510 122.850
28 Formika motif Uk. 1,20x2,40 Lembar 260.000 267.800 273.000
29 Reng kayu Borneo Super Meranti 2/3 Btg 10.920 11.248 11.466
30 Reng kayu Borneo Super Meranti 3/4 Btg 21.840 22.495 22.932
31 Polywood 9 mm Lembar 381.635 382.270 382.905
32 Gypsum Jayaboard Lembar 84.760 121.920 122.555
33 Gypsum 120x240
Elephant Cm
120x240 Lembar 81.250 121.920 122.555
Gypsum cm Lembar
34 Jayaboard 195.000 121.920 122.555
120x240 Cm,
9mm
35 Gypsum Knauf Lembar 88.200 90.846 92.610
36 Dome Gypsum Merak dia 85 cm Buah 260.000 267.800 273.000
37 Dome Gypsum Bunga dia 90 cm Buah 325.000 334.750 341.250
38 GRC/versaboard (1,20x2,40), 4 mm Lbr 71.500 73.645 75.075
39 GRC/versaboard (1,20x2,40), 6 mm Lbr 120.250 123.858 126.263
40 GRC/versaboard (1,20x2,40), 9 mm Lbr 162.500 167.375 170.625
41 Kalsiboard (240x120 Cm) Lembar 95.885 96.520 97.155
42 Eternit Dua Gajah Lembar 7.150 7.365 7.508
43 Eternit Hardflex 5 mm, Lembar 57.980 59.719 60.879
44 Eternit uk.1.05x1.80
Hardflex 5 mm, Lembar 74.750 76.993 78.488
45 Eternit asbes semen uk.1.05x2.40
1.00x1.00x3.5 mm Lembar 19.500 20.085 20.475
46 Eternit asbes semen 1.00x1.00x4.0 mm Lembar 20.800 21.424 21.840
47 Eternit asbes semen 1.00x1.00x5.0 mm Lembar 26.000 26.780 27.300
48 Eternit asbes semen 1.00x1.00x6.0 mm Lembar 32.500 33.475 34.125
49 Akustik Amstrong NDF. Lembar 17.250 17.768 18.113
50 Akustik Amstrong 0.60x1.20x0.015
NDF. Lembar 9.250 9.528 9.713
VI LIST PROFIL PLAFOND 0.30x0.60x0.015
1 1 x 4 cm panjang 4 m Batang 19.145 19.241 19.304
2 3 x 3 cm panjang 4 m Batang 25.495 25.591 25.654
3 4 x 4 cm panjang 4 m Batang 31.845 31.941 32.004
4 5 x 5 cm panjang 4 m Batang 34.385 34.481 34.544
VII BAHAN ATAP
1 Genteng keramik warna Stand. KIA Buah 5.200 5.356 5.460
2 Genteng keramik warna Khusus KIA Buah 10.725 11.047 11.261
3 Bubung genteng keramik warna Stand. KIA Buah 17.225 17.742 18.086
4 Bubung genteng keramik warna Khusus. KIA Buah 25.350 26.111 26.618
5 Genteng metal Rainbow m2 65.000 66.950 68.250
6 Genteng metal Sakura Lbr 40.300 41.509 42.315
7 Bubung Genteng metal Rainbow Buah 33.605 34.613 35.285
8 Bubung Genteng metal Sakura Buah 42.900 44.187 45.045
9 Genteng Multi Roof Color (77x100 cm) Lembar 121.603 121.920 122.238
10 Genteng Metal Multi Roof (Stone) Lembar 109.200 112.476 118.100
11 Genteng Surya Roof Color (77x80 cm) Lembar 66.993 67.310 67.628
12 Genteng Metal Surya Roof (Stone) Lembar 75.000 77.250 78.750
13 Genteng Sakura Roof (77x80 cm) Clasic Lembar 45.403 45.720 46.038
14 Genteng Sakura Roof (77 x 80 cm) Royal Lembar 44.133 44.450 44.768
15 Genteng Sakura Roof (uk. 80x70 1,62/m2) Krystal Lembar 46.200 47.586 48.510
16 Genteng Sakura Roof (uk. 80x70 1,62/m2) Merpaty Lembar 47.600 49.028 49.980
17 Genteng Soka Abadi (80 x 140 cm) Lembar 96.203 96.520 96.838
18 Paku Genteng Kg 44.577 44.641 44.831
19 Nok Genteng Multi Roof Color Std (P=100 cm) Buah 67.501 67.628 68.263
20 Nok Genteng Surya Roof Color Std (P=91 cm) Buah 63.691 63.818 64.453
21 Nok Genteng Sakura Roof Clasic Std (P=91 Buah 42.101 42.228 42.863
22 cm)
Nok Genteng Sakura Roof Royal Std (P=91 cm) Buah 42.101 42.228 42.863
23 Nok Genteng Soka Abadi Std (P=110 cm) Buah 57.341 57.468 58.103
24 Asbes Gelombang Uk. Lbr 58.500 60.255 61.425
25 Asbes Gelombang 1.05x1.80x4mm
Uk. Lbr 71.500 73.645 75.075
26 Asbes Gelombang 1.05x2.10x4mm
Uk. Lbr 83.200 85.696 87.360
27 Asbes Gelombang 1.05x2.40x4mm
Uk. Lbr 89.700 92.391 94.185
28 Asbes Gelombang 1.05x2.70x4mm
Uk. Lbr 101.400 104.442 106.470
29 Asbes Gelombang 1.05x3.00x4mm
Uk. Lbr 41.080 42.312 43.134
30 Asbes Gelombang 1.10x1.80x5mm
Uk. Lbr 49.400 50.882 51.870
31 Asbes Gelombang 1.10x2.00x5mm
Uk. Lbr 35.100 36.153 36.855
32 Asbes Gelombang 1.10x2.25x5mm
Uk. Lbr 38.350 39.501 40.268
33 Asbes Gelombang 1.10x2.50x5mm
Uk. Lbr 54.600 56.238 57.330
34 Asbes Gelombang 1.10x3.00x5mm
Uk. Lbr 34.710 35.751 36.446
35 Asbes Gelombang 1.10x1.80x6mm
Uk. Lbr 37.050 38.162 38.903
36 Asbes Gelombang 1.10x2.00x6mm
Uk. Lbr 40.625 41.844 42.656
37 Asbes Gelombang 1.10x2.25x6mm
Uk. Lbr 44.460 45.794 46.683
38 Asbes Gelombang 1.10x2.50x6mm
Uk. Lbr 65.000 66.950 68.250
39 Nok stel gelombang 1.10x3.00x6mm
0.92 m Lbr 32.370 33.341 33.989
40 Nok stel gelombang 1.10 m Lbr 39.000 40.170 40.950
41 Nok stel rata 1.10 m Lbr 23.920 24.638 25.116
42 Nok stel rata 0.92 m Lbr 20.150 20.755 21.158
43 Nok paten rata 1.05 m Lbr 20.800 21.424 21.840
44 Nok paten gelombang 0.92 m Lbr 13.000 13.390 13.650
45 Nok paten gelombang 1.05 m Lbr 17.550 18.077 18.428
46 Nok paten gelombang 1.10 m Lbr 21.840 22.495 22.932
47 Nok asbes Buah 22.575 23.252 23.704
48 Seng BWG 34" BJLS 0.20 mm kk 8.573 8.890 9.843
49 Plat Multi Roof (Stone) Lembar 57.750 59.483 60.638
50 Plat Multi Roof (Colour) Lembar 31.500 32.445 33.075
51 Seng Zincalum Model Trimdex 5,6 m 233.100 240.093 244.755
52 Seng Plat BJLS 20 Plat lebar M' 25.200 25.956 26.460
53 Seng Plat 45cm
BJLS 20 Plat lebar M' 35.000 36.050 36.750
54 Seng Plat 55cm 20 Plat lebar
BJLS M' 37.800 38.934 39.690
55 Seng Plat 60cm
BJLS 20 Plat lebar M' 42.000 43.260 44.100
56 Seng Plat 70cm
BJLS 20 Plat lebar M' 44.800 46.144 47.040
57 Seng Plat 80cm
BJLS 20 Plat lebar M' 47.600 49.028 49.980
58 Seng Plat 90cm
BJLS 25 Plat lebar M' 58.800 60.564 61.740
59 Seng gelombang 90cm
BJLS 30 Uk. lembar 96.600 99.498 101.430
60 Seng gelombang 90x180
BJLS 25cm
Uk. lembar 112.000 115.360 117.600
61 Seng gelombang 90x180
BJLS 20cm
Uk. lembar 126.000 129.780 132.300
62 Seng gelombang 90x240
BJLS 20cm
Uk. lembar 154.000 158.620 161.700
63 Karet Talang 50 Cm 90x300 cm m 19.368 19.685 20.638
64 Atap Fiber / Seng Plastik kk 16.193 16.510 17.463
65 Pemasangan Baja Ringan M2 171.450 177.800 184.150
66 Pemasangan Genteng Metal M2 76.200 82.550 88.900
67 Rangka Baja Ringan C.75/80 Zincalume m2 196.000 201.880 205.800
68 Rangka Baja Ringan C.75/100 Zincalume m2 210.000 216.300 220.500
69 Rangka Baja Ringan C.75/65 Zincalume m2 154.000 158.620 161.700
70 Rangka Baja Ringan C.75/70 Zincalume m2 161.000 165.830 169.050
71 Rangka Baja Ringan C.75/80 Zincalume m2 182.000 187.460 191.100
72 Rangka Baja Ringan C.75/100 Zincalume m2 196.000 201.880 205.800
73 Aluminium Foil Double Karung 1,20m x 50m 806.000 830.180 846.300
74 Aluminium Foil Single Karung 1,20m x 50m 494.000 508.820 518.700
75 Glass Block/Roster Uk. 20x20 Buah 30.800 31.724 32.340
76 Glass Block/Roster Uk. 20x20 Dus 168.000 173.040 176.400
77 Roster Ekonomis Uk. 20x20 polos Buah 46.200 47.586 48.510
78 Roster Ekonomis Uk. 30x30 polos Buah 61.600 63.448 64.680
79 Roster Minimalis (RO-56) Uk. 20x40 Pcs 65.800 67.774 69.090
80 Roster Minimalis (RO-73) Uk. 20x40 Pcs 65.800 67.774 69.090
81 Roster Lukis Uk. 20x20 warna Buah 50.400 51.912 52.920
82 Roster Lukis Uk. 30x30 warna Buah 65.800 67.774 69.090
83 Roster Tanah Uk. 10x20 Buah 4.200 4.326 4.410
84 Roster Tanah Uk. 20x20 Buah 11.200 11.536 11.760
85 Seng Alkan Tebal 0,35 mm meter 86.800 89.404 91.140
86 Seng Alkan Tebal 0,35 mm meter 109.200 112.476 114.660
87 Seng Talang Alkan Tebal 0,45 mm meter 112.000 115.360 117.600
88 Seng Talang Alkan Tebal 0,45 mm roll 5,250,000 5,407,500 5,512,500
VIII BAHAN CAT DAN MINYAK
1 Wall paper biasa Uk. 0.50x10.00 m roll 110.500 113.815 116.025
2 Wall paper corak Uk. 0.50x10.00 m roll 260.000 267.800 273.000
3 Minyak Cat ND Kg 31.877 31.941 32.131
4 Soda Coustic Kg 6.500 6.695 6.825
5 Cat Glotex Kg 60.000 85.000 95.000
6 Cat Zinchromte warna agung Kg 45.500 46.865 47.775
7 Thener ND Ltr 31.877 31.941 32.131
8 Thener Duco Ltr 99.750 102.743 104.738
9 Cat Tembok Avitex Kg 22.987 23.051 23.241
10 Cat Tembok Metrolite 25 Kg 450.000 500.000 600.000
11 Cat Tembok Aries Kg 15.367 15.431 15.621
12 Cat Tembok Tiger Kg 12.827 12.891 13.081
13 Cat Tembok Mowilex Kg 38.227 38.291 38.481
14 Cat Tembok Aqualastik Kg 41.402 41.466 41.656
15 Cat Tembok Warna Stand. Dulux (Interior) Ltr 35.750 36.823 37.538
16 Cat Tembok Warna Tua Dulux (Interior) Ltr 41.600 42.848 43.680
17 Cat Tembok Warna Stand. Dulux (Exterior) Ltr 55.250 56.908 58.013
18 Cat Tembok Warna Stand. Catylac (Exterior) Ltr 16.250 16.738 17.063
19 Cat Tembok Warna Stand. Maxilite (Exterior) Ltr 9.750 10.043 10.238
20 Cat Tembok Warna Stand. Romatex Ltr 16.380 16.871 17.199
21 Cat Tembok Saniex Kg 9.750 10.043 10.238
22 Cat Tembok Saniex Wonder Kg 11.375 11.716 11.944
23 Cat Tembok Vinilex Kg 29.250 30.128 30.713
24 Cat Tembok Wiratex Kg 7.475 7.699 7.849
25 Cat dasar / tembok Aquaproof 20 Kg 820.000 844.600 861.000
26 Cat dasar / tembok Indo Base 9000 Kg 23.400 24.102 24.570
27 Cat dasar kayu Seafer Base Ltr 19.500 20.085 20.475
28 Cat dasar Alkali Ltr 29.900 30.797 31.395
29 Cat Many Kayu/Besi Kg 25.527 25.591 25.781
30 Cat Kilap Kayu Avian Kg 69.977 70.041 70.231
31 Cat Minyak Dop Glotex Kg 60.000 61.800 63.000
32 Cat Minyak (Kilat) Glotex Kg 70.000 72.100 73.500
33 Cat Jembatan (Avian) Avian 5 Kg 342.300 352.569 359.415
34 Cat Minyak/Cat Kayu/Besi Glotex Kg 60.000 61.800 63.000
35 Cat Kayu warna standar Dulux Ltr 54.600 56.238 57.330
36 Cat Kayu warna putih Dulux Ltr 58.500 60.255 61.425
37 Cat Kayu warna spesial Dulux Ltr 61.100 62.933 64.155
38 Cat Kayu / Besi Seiv Kg 58.500 60.255 61.425
39 Cat Kayu / Besi Avian Kg 61.100 62.933 64.155
40 Cat Cair Avian Kg 70.000 72.100 73.500
41 Cat Galvanis Avian Kg 75.000 77.250 78.750
42 Cat Marka Jalan Altis 5 Kg 278.250 286.598 292.163
43 Cat Marka Jalan Altis Kg 65.000 66.950 68.250
44 Cat Meni/Dasar Avian Kg 30.000 30.900 31.500
45 Cat waterpooling Aquaproof Kg 61.100 62.933 64.155
46 Cat waterpooling Ultraroof Kg 52.000 53.560 54.600
47 Cat waterpooling Aquatile Kg 110.500 113.815 116.025
INTERIOR
48 Cat Tembok Satin Putih 18,9 L 1,523,600 1,569,308 1,599,780
49 Cat Tembok Satin Putih 3,78 L 318.500 328.055 334.425
50 Cat Tembok Satin Mudah 18,9 L 1,558,700 1,605,461 1,636,635
51 Cat Tembok Satin Mudah 3,78 L 327.600 337.428 343.980
52 Cat Tembok Satin Tua 18,9 L 1,830,400 1,885,312 1,921,920
53 Cat Tembok Satin Tua 3,78 L 396.500 408.395 416.325
54 Alkali Resisiting Primer 18,9 L 1,103,700 1,136,811 1,158,885
55 Alkali Resisiting Primer 3,78 L 237.900 245.037 249.795
EXTERIOR
56 Cat Tembok Satin Putih 18,9 L 2,293,200 2,361,996 2,407,860
57 Cat Tembok Satin Putih 3,78 L 471.900 486.057 495.495
58 Cat Tembok Satin Mudah 18,9 L 2,345,200 2,415,556 2,462,460
59 Cat Tembok Satin Mudah 3,78 L 481.000 495.430 505.050
60 Cat Tembok Satin Tua 18,9 L 2,479,100 2,553,473 2,603,055
61 Cat Tembok Satin Tua 3,78 L 512.200 527.566 537.810
62 Alkali Resisiting Primer (Luar) 18,9 L 1,638,000 1,687,140 1,719,900
63 Alkali Resisiting Primer (Luar) 3,78 L 356.200 366.886 374.010
64 Alkali Resisiting Primer (Solvent) 18,9 L 1,730,300 1,782,209 1,816,815
65 Alkali Resisiting Primer (Solvent) 3,78 L 365.300 376.259 383.565
SPECTRUM
66 Cat Tembok Flat Putih 18,9 L 782.600 806.078 821.730
67 Cat Tembok Flat Putih 3,78 L 162.500 167.375 170.625
68 Cat Tembok Flat Muda 18,9 L 854.100 879.723 896.805
69 Cat Tembok Flat Muda 3,78 L 176.800 182.104 185.640
70 Cat Tembok Flat Tua 18,9 L 1,011,400 1,041,742 1,061,970
71 Cat Tembok Flat Tua 3,78 L 210.600 216.918 221.130
72 Alkali Resisting Primer 18,9 L 733.200 755.196 769.860
73 Alkali Resisting Primer 3,78 L 152.100 156.663 159.705
74 Dempul Tembok (Plamur) Kg 71.500 73.645 75.075
75 Plamur Kingkong Sak 161.000 165.830 169.050
76 Plamur Eco Emulsion 5Kg 63.000 64.890 66.150
77 Plamur RJ Kg 21.000 21.630 22.050
78 Plamur RJ 5Kg 63.000 64.890 66.150
79 Plamur Rj Peil 252.000 259.560 264.600
80 Meni Besi Glotex Kg 40.000 41.200 42.000
81 Meni Kayu/Besi Bola Mata Kg 42.900 44.187 45.045
82 Politur/ Vernis Ltr 63.627 63.691 63.881
83 Dempul Glotex Kg 5.000 5.150 5.250
84 Dempul Kayu Cap Kucing Kg 33.185 25.591 25.781
85 Dempul Halus Impra Kg 41.600 42.848 43.680
86 Dempul lilin Kg 35.100 36.153 36.855
87 Dempul plastik Kg 19.500 20.085 20.475
88 Lem Kayu (Fox) Kg 25.527 25.591 25.781
89 Residu Kg 31.877 31.941 32.131
90 Cat Atap AGA Kg 108.077 108.141 108.331
91 Amplas Kasar Kayu Eagel Lembar 6.445 6.477 6.541
92 Amplas Halus Kayu Eagel Lembar 6.445 6.477 6.541
93 Amplas Besi Eagel Lembar 4.000 4.120 4.200
94 Kuas 3 Cm Buah 19.145 19.177 19.241
95 Kuas 4 Cm Buah 25.495 25.527 25.591
96 Kuas 5 Cm Buah 31.845 31.877 31.941
97 Kuas Rol Buah 31.845 31.877 31.941
98 Plamir Unilex Kg 75.000 77.250 78.750
99 Pelapis Anti Bocor Aquaproof Kg 50.000 51.500 52.500
100 Pelapis Anti Bocor Aquaproof 4 Kg 182.000 187.460 191.100
101 Zat adiktif Pengeras Beton - Ltr 40.000 41.200 42.000
IX KUNCI - KUNCI
1 Kunci Tanam 2 Kali Putar T Buah 190.627 190.691 190.881
2 Kunci Tanam Antik Buah 279.527 279.591 279.781
3 Gembok Soligen 50 mm leher pcs 75.000 77.250 78.750
4 Gembok pendek
Soligen 40 mm leher pcs 60.000 61.800 63.000
5 Gembok pendek
Soligen 50 mm leher pcs 38.000 39.140 39.900
6 Grendel Pintu Biasa panjang Buah 25.495 25.527 25.591
7 Grendel Pintu Kuningan Buah 31.845 31.877 31.941
8 Grendel Jendela Biasa Buah 12.795 12.827 12.891
9 Grendel Jendela Kuningan Buah 25.495 25.527 25.591
10 Engsel Pintu Nylon Besar Psg 32.500 33.475 34.125
11 Engsel Pintu Nylon Kecil Psg 29.250 30.128 30.713
12 Engsel Pintu Aluminium (Floor Hinge) DORMA Uk. Pintu Buah 750.000 975.000 787.500
13 Engsel Pintu Aluminium (Floor Hinge) Standard
AKN Uk. Pintu Buah 600.000 780.000 630.000
14 Engsel jendela -Standard Buah 9.000 9.270 9.450
15 Engsel BLC 3" - Psg 25.000 25.750 26.250
16 Engsel BLC 4" - Psg 35.000 36.050 36.750
17 Engsel Gerber 3" - Psg 38.000 39.140 39.900
18 Engsel Gerber 4" - Psg 48.000 49.440 50.400
19 Engsel SES 4" - psg 234.000 241.020 245.700
20 Espag nolet - psg 227.500 234.325 238.875
21 Handel pintu Type besar psg 260.000 267.800 273.000
22 Handel Jendela - Buah 10.000 10.300 10.500
23 Kait angina - Buah 7.000 7.210 7.350
24 Pisher m' 3.900 4.017 4.095
25 Slot pintu berikut rantai Buah 45.500 46.865 47.775
26 Slot jendela tunggal - Buah 48.750 50.213 51.188
27 Kunci pintu tanam besar - Buah 292.500 301.275 307.125
28 Kunci pintu tanam kecil Buah 136.500 140.595 143.325
29 Kunci Pintu Type Besar Cap Kuda Terbang Buah 58.500 60.255 61.425
30 Kunci Pintu Type Kecil Cap Kuda Terbang Buah 52.000 53.560 54.600
31 Kunci Bulat SES Set 110.500 113.815 116.025
32 Kunci SES Set 286.000 294.580 300.300
33 Kunci F&F (SES) Set 299.000 307.970 313.950
34 Kunci Kodai Premier Set 234.000 241.020 245.700
35 Full Handle Gerber psg 234.000 241.020 245.700
36 Door stop type 013/GP Buah 110.500 113.815 116.025
37 Door stop type 013/S Buah 58.500 60.255 61.425
38 Door stop type 014/US 3 Buah 19.500 20.085 20.475
39 Door closer Buah 260.000 267.800 273.000
40 Reel pintu dorong Marathon 1 Pintu Unit 162.500 167.375 170.625
X BAHAN INSTALASI LISTRIK
1 Pipa ø 5/8 inch, panjang 4 m, SNI Batang 23.495 23.813 24.130
2 Pipa ø 3/4 inch, panjang 4 m, SNI Batang 32.385 32.703 33.020
3 Pipa ø 1 inch, panjang 4 m, SNI Batang 51.435 51.753 52.070
4 Pipa Conduit TM 20 mm (3 m) Batang 7.800 8.034 8.190
5 Kabel NYY (Eterna) 2 x 1.5 mm (50 m) Rol 418.600 431.158 439.530
6 Kabel NYY (Eterna) 2 x 2.5 mm (50 m) Rol 564.200 581.126 592.410
7 Kabel NYY (Eterna) 3 x 1.5 (50 m) Rol 517.400 532.922 543.270
8 Kabel NYY (Eterna) 3 x 2.5 (50 m) Rol 695.500 716.365 730.275
9 Kabel NYM (eterna) 3x1,5 (50 m) Rol 380.900 392.327 399.945
10 Kabel NYM (eterna) 3x2,5 (50 m) Rol 542.100 558.363 569.205
11 Kabel NYM (eterna) 2x1,5 (50 m) Rol 297.700 306.631 312.585
12 Kabel NYM (eterna) 2x2,5 (50 m) Rol 426.400 439.192 447.720
13 Stop Kontak 1 Lobang setara Buah 15.600 16.068 16.380
broco
14 Stop Kontak 2 Lobang setara Buah 27.300 28.119 28.665
15 Sok TM 20 mm broco
1 doz (100 pcs) Doz 26.000 26.780 27.300
16 Klem TM 20 mm 1 doz (100 pcs) Doz 28.600 29.458 30.030
17 L Bow TM 20 mm Buah 2.600 2.678 2.730
18 T Dos 3 way 20 mm Buah 1.950 2.009 2.048
19 T Dos 4 way 20 mm Buah 2.600 2.678 2.730
20 Inbow Doos TM 20 mm Buah 1.950 2.009 2.048
21 Outbow Doos TM 20 mm Buah 3.900 4.017 4.095
22 Sekring Kast 1 Group Biasa, SNI Buah 47.085 47.117 47.181
23 Sekring Kast 2 Group Biasa, SNI Buah 45.815 45.847 45.911
24 Sekring Kast 3 Group Biasa, SNI Buah 106.775 106.807 106.871
25 Saklar tunggal Setara Broco Buah 15.600 16.068 16.380
26 Saklar ganda Setara Broco Buah 19.500 20.085 20.475
27 Fitting Gantung, SNI Buah 88.995 89.027 89.091
28 Fitting Plafond, SNI Buah 50.895 50.927 50.991
29 Solasi Listrik unibell Buah 7.800 8.034 8.190
30 Pleksible Conduit TM 20 mm m' 5.200 5.356 5.460
31 Terminal 4 mm Buah 6.500 6.695 6.825
32 Terminal 6 mm Buah 7.800 8.034 8.190
33 Terminal 10 mm Buah 10.140 10.444 10.647
34 Terminal 16 mm Buah 13.182 13.577 13.841
35 Bola Lampu 15 - 75 Watt, SNI Buah 63.595 63.627 63.691
36 Bola Lampu 100 Watt pijar, SNI Buah 12.795 12.827 12.891
37 Lampu TL 1 x 20 W, SNI Buah 120.745 120.777 120.841
38 Lampu TL 2 x 20 W, SNI Buah 254.095 254.127 254.191
39 Lampu TL 1 x 40 W, SNI Buah 190.595 190.627 190.691
40 Lampu TL 2 x 40 W, SNI Buah 406.495 406.527 406.591
41 Lampu TL Lingkar 10 W, SNI Buah 43.275 43.307 43.371
42 Lampu TL Lingkar 20 W, SNI Buah 61.055 61.087 61.151
43 Lampu Pijar 25 Watt, SNI Buah 10.255 10.287 10.351
44 Lampu Pijar 40 Watt, SNI Buah 11.525 11.557 11.621
45 Lampu Pijar 60 Watt, SNI Buah 11.525 11.557 11.621
46 Lampu Pijar 100 Watt, SNI Buah 12.795 12.827 12.891
47 Lampu PLC 5 Watt, SNI Buah 35.655 35.687 35.751
48 Lampu PLC 8 Watt, SNI Buah 38.195 38.227 38.291
49 Lampu PLC 11 Watt, SNI Buah 42.005 42.037 42.101
50 Lampu PLC 14 Watt, SNI Buah 44.545 44.577 44.641
51 Lampu PLC 18 Watt, SNI Buah 47.085 47.117 47.181
52 Lampu PLC 23 Watt, SNI Buah 50.895 50.927 50.991
53 Lampu PLC 35 Watt, SNI Buah 139.795 139.827 139.891
54 Dudukan lampu RMI 2x18 watt Buah 104.000 107.120 109.200
55 Dudukan lampu RMI 2x36 watt Buah 130.000 133.900 136.500
56 Dudukan lampu Downlight uk. 4" Buah 49.400 50.882 51.870
57 Dudukan lampu Downlight uk. 5" Buah 62.400 64.272 65.520
58 Kotak MCB, 4 Group, SNI Buah 82.645 82.677 82.741
59 Kabel NYA Eterna 1x1.5 mm (100 m) Roll 185.500 191.065 200.618
60 Kabel NYA Eterna 1x2.5 mm (100 m) Roll 299.000 307.970 323.369
61 Kabel NYA Eterna 1x4 mm (100 m) Roll 468.000 482.040 506.142
62 Kabel NYA Praba 3x2.5 mm Roll 715.000 736.450 773.273
63 Jarum Penangkal Petir Buah 136.500 140.595 143.325
64 Kawat BC Tembaga Kg 97.500 100.425 102.375
65 Pertahanan Penangkal Petir Titik 585.000 602.550 614.250
66 Bahan Huruf Stainles cm 9.750 10.043 10.238
67 Bahan Huruf Acrylic cm 8.450 8.704 9.139
68 Bahan Huruf Fibre cm 7.800 8.034 8.436
XI BAHAN SANITASI
1 Kloset Jongkok Set 224.155 226.060 228.600
2 Kloset Duduk Tanpa Tabung Set 763.905 765.810 768.350
3 Kloset Duduk Dengan Tabung Set 3,748,405 3,750,310 3,752,850
4 Kloset Jongkok AS (Warna Muda) Pcs 266.500 274.495 288.220
5 Kloset Jongkok AS (Warna Tua) 305.500 314.665 330.398
6 Kloset Duduk AS (Winplus Dual Set 1,625,000 1,673,750 1,757,438
7 Kloset Duduk Tanpa Kaki Flush)
AS (Warna Muda) Pcs 741.000 763.230 801.392
8 Wastafel Dinding Set 573.405 575.310 577.850
9 Wastafel Gantung Toto (L 237 V1B) Set 5,850,000 6,025,500 6,326,775
10 Wastafel Gantung Toto (L 237 V3) Set 2,925,000 3,012,750 3,163,388
11 Wastafel Gantung Toto (L 237 L34) Set 2,925,000 3,012,750 3,163,388
12 Wastafel Gantung Toto (246 CJ) Set 1,596,400 1,644,292 1,726,507
13 Wastafel Gantung Toto (7 CJ) Set 1,847,300 1,902,719 1,997,855
14 Wastafel Gantung Toto (810 CJ) Set 5,921,500 6,099,145 6,404,102
15 Wastafel di Bawah Meja Toto (L 546 ) Set 3,291,600 3,390,348 3,559,865
16 Wastafel di Bawah Meja Toto (L 548 ) Set 3,390,400 3,492,112 3,666,718
17 Wastafel di Bawah Meja Toto (LW 530 J ) Set 2,779,400 2,862,782 3,005,921
18 Wastafel di Bawah Meja Toto (LW 540 J ) Set 4,759,300 4,902,079 5,147,183
19 Wastafel di Bawah Meja Toto (LW 549 J ) Set 3,780,400 3,893,812 4,088,503
20 Wastafel di Bawah Meja Toto (LW 651 J ) Set 3,068,000 3,160,040 3,318,042
21 Wastafel di Bawah Meja Toto (LW 651 J ) Set 3,068,000 3,160,040 3,318,042
22 Wastafel di Atas Meja Toto (L 652 D ) Set 1,807,000 1,861,210 1,954,271
23 Wastafel di Atas Meja Toto (LW 535 J ) Set 3,764,800 3,877,744 4,071,631
24 Wastafel di Atas Meja Toto (LW 542 J ) Set 4,089,800 4,212,494 4,423,119
25 Wastafel di Atas Meja Toto (LW 642 CJ ) Set 4,080,700 4,203,121 4,413,277
26 Wastafel di Atas Meja Toto (LW 645 JN ) Set 3,976,700 4,096,001 4,300,801
27 Wastafel di Atas Meja Toto (LW 815 CJ ) Set 5,309,200 5,468,476 5,741,900
28 Wastafel di Atas Meja Toto (LW 816 J ) Set 19,308,900 19,888,167 20,882,575
29 Bak Cuci Logam 1 Lubang Set 319.405 321.310 323.850
30 Bak Mandi Fiber Glass Uk. Kecil Buah 288.730 297.392 312.261
31 Bak Mandi Fiber Glass Uk. Besar Buah 325.130 334.884 351.628
32 Pompa Air 450 Watt, Head 9 m Buah 700.405 702.310 704.850
33 Kran Air Kuningan ø 1/2" GI Buah 31.845 31.877 31.941
34 Kran Air Kuningan ø 3/4" GI Buah 38.195 38.227 38.291
35 Kran Air Biasa ø 1/2" GI Buah 19.145 19.177 19.241
36 Kran Air Biasa ø 3/4" GI Buah 31.845 31.877 31.941
37 Kran Cuci Piring Flexible Pcs 308.000 317.240 333.102
38 Kran Cuci Piring Std Pcs 50.400 51.912 54.508
39 Kran Cuci Piring Pcs 147.000 151.410 158.981
40 Kran 1/2" San-E Pcs 231.000 237.930 249.827
41 Kran 1/2" Ekonomi San-E Pcs 126.000 129.780 136.269
42 Kran Shower Tanam San-E Pcs 487.200 501.816 526.907
43 Kran Cabang San-E Pcs 487.200 501.816 526.907
44 Kran 1/2" Onda Pcs 22.400 23.072 24.226
45 Kran 3/4" Onda Pcs 46.200 47.586 49.965
46 Kran 1/2" Stainles Onda Pcs 49.000 50.470 52.994
47 Lem Paralon Buah 16.250 16.738 17.574
48 Kran Panas / Dingin Buah 500.500 515.515 541.291
49 Floor Drain Sen Ei Buah 221.000 227.630 239.012
50 Floor Drain Lokal Buah 71.500 73.645 77.327
51 Stop Kran 1/2" Jiarong Pcs 16.800 17.304 18.169
52 Stop Kran 3/4" Jiarong Pcs 21.000 21.630 22.712
53 Stop Kran 1" Onda Pcs 28.000 28.840 30.282
54 Shower Bidet Onda Pcs 91.000 93.730 98.417
55 Shower Mandi Onda Pcs 110.600 113.918 119.614
56 Soket ø 1/2" s/d 3/4" Buah 19.145 19.177 19.241
57 Knee ø 1/2" s/d 3/4" Buah 19.145 19.177 19.241
58 Tanki Air Stainlesteel 1200 ltr Buah 4,159,250 4,191,000 4,222,750
59 Tanki Air Fibre Glass Kap. 500 Liter ex PINGUIN Buah 1,170,000 1,205,100 1,265,355
60 Tanki Air Fibre Glass Kap. 1000 Liter ex PINGUIN Buah 2,080,000 2,142,400 2,249,520
61 Tanki Air Fibre Glass Kap. 2000 Liter ex PINGUIN Buah 3,770,000 3,883,100 4,077,255
62 Elbow ø 1/2" s/d 3/4" Buah 19.145 19.177 19.241
63 Tee Stuk ø 1/2" s/d 3/4" Buah 19.145 19.177 19.241
64 Lem Pipa PVC Kaleng 63.595 63.627 63.691
65 Floor Drain Buah 63.595 63.627 63.691
66 Floor Drain FLS 02 2" Buah 45.000 46.350 48.668
67 Floor Drain FLS 02 3" Buah 75.000 77.250 81.113
68 Floor Drain FLS 02 4" Buah 115.000 118.450 124.373
69 Floor Drain FLS 03 3" 156.000 160.680 168.714
70 Floor Drain FLS 04 2" 102.500 105.575 110.854
71 Floor Drain FLS 07 2" 125.000 128.750 135.188
72 Floor Drain FLS 06 3" 118.000 121.540 127.617
73 Floor Drain FLS 05 Short 1,5" 102.000 105.060 110.313
74 Floor Drain FLS 08 Long 2" 209.000 215.270 226.034
75 Floor Drain FLS 09 4x2 202.000 208.060 218.463
76 Floor Drain FLS 09 5x3 285.000 293.550 308.228
77 Floor Drain FLS 10 30.000 30.900 32.445
78 Roof Drain RFS 01 Brass 3" 165.000 169.950 178.448
79 Roof Drain RFS 01 Iron 3" 115.000 118.450 124.373
80 Selang Plastik 3/4" Roll 241.395 241.427 241.491
81 Selang Benang 1/2" Roll 550.000 566.500 594.825
82 Selang Benang 5/8" Roll 650.000 669.500 702.975
83 Tedmond Tangki Air Fiber Uk. 250 L Buah 616.000 634.480 666.204
84 Tedmond Tangki Air Fiber Uk. 550 L Buah 966.000 994.980 1,044,729
85 Tedmond Tangki Air Fiber Uk. 900 L Buah 1,512,000 1,557,360 1,635,228
86 Tedmond Tangki Air Fiber Uk. 1100 L Buah 1,610,000 1,658,300 1,741,215
87 Tedmond Tangki Air Fiber Uk. 1500 L Buah 2,478,000 2,552,340 2,679,957
88 Tedmond Tangki Air Fiber Uk. 2200 L Buah 3,248,000 3,345,440 3,512,712
89 Tedmond Grand Uk. 900 L Pcs 1,512,000 1,557,360 1,635,228
90 Tedmond Tangki Air Stainless Uk. 500 L Buah 2,486,400 2,560,992 2,689,042
91 Tedmond Tangki Air Stainless Uk. 1000 L Buah 5,241,600 5,398,848 5,668,790
92 Tedmond Tangki Air Stainless Uk. 1500 L Buah 6,538,000 6,734,140 7,070,847
93 Tedmond Tangki Air Stainless Uk. 2000 L Buah 8,913,800 9,181,214 9,640,275
94 Tedmond Tangki Air Stainless Uk. 2300 L Buah 10,248,000 10,555,440 11,083,212
95 Bak Mandi Fiber Tedmond Uk. 210 Buah 434.000 447.020 469.371
96 Bak Mandi Fiber Tedmond Uk. 310 Buah 616.000 634.480 666.204
97 Bak Mandi Teraso Buah 71.500 325.130 341.387
98 Badkip Toto (FB. Buah 2,405,000 2,477,150 2,601,008
Kitchen Zink Stainless Standard 1500/1700 Bh
99 1 Lubang STD) 227.500 234.325 246.041
100 Kitchen Zink Stainless Standard (SAKURA)
2 Lubang Uk. Bh 606.580 624.777 656.016
0.80 x 0.50
(MAJESTIC)
101 Jendela Nako Lengkap Tralis m2 71.500 73.645 77.327
102 Urioir Buah 1,120,000 1,153,600 1,211,280
XII BAHAN PIPA
1 Pipa PVC ø 1/2" (AW) 4 m Batang 28.575 28.893 29.210
2 Pipa PVC ø3/4" (AW) 4 m Batang 38.735 39.053 39.370
3 Pipa PVC ø 1" (AW) 4 m Batang 51.435 51.753 52.070
4 Pipa PVC ø 1,5" (AW) 4 m Batang 89.535 89.853 90.170
5 Pipa PVC ø 2" (AW) 4 m Batang 127.635 127.953 128.270
6 Pipa PVC ø 2,5" (AW) 4 m Batang 165.735 166.053 166.370
7 Pipa PVC ø 3" (AW) 4 m Batang 210.185 210.503 210.820
8 Pipa PVC ø 4" (AW) 4 m Batang 349.885 350.203 350.520
9 Pipa PVC dia. 250 mm’ (10") @6m Batang 3,042,000 3,133,260 3,289,923
10 Pipa PVC dia. 200 mm’ (8") @6m Batang 1,949,220 2,007,697 2,108,081
11 Pipa PVC dia. 200 mm’ (6") @6m Batang 1,236,690 1,273,791 1,337,480
12 Pipa PVC dia. 100 mm’ (4") @6m Batang 576.420 593.713 623.398
13 Pipa PVC dia. 75 mm’ (3") @6m Batang 397.020 408.931 429.377
14 Pipa PVC dia. 50 mm’ (2") @6m Batang 189.930 195.628 205.409
15 Pipa PVC dia. 25 mm’ (3/4") @6m Batang 26.000 26.780 28.119
16 Pipa Hitam Kelas Medium Dia Batang 143.000 147.290 154.655
17 Pipa Hitam 1"
Kelas Medium Dia Batang 227.500 234.325 246.041
18 Pipa Hitam 1 1/4"Medium Dia
Kelas Batang 305.500 314.665 330.398
19 Pipa Hitam 1 1/2"Medium Dia
Kelas Batang 338.000 348.140 365.547
20 Pipa Hitam 2"
Kelas Medium Dia Batang 221.000 227.630 239.012
21 Pipa Hitam 2 1/2"Medium Dia
Kelas Batang 331.500 341.445 358.517
22 Pipa Hitam 3"
Kelas Medium Dia Batang 494.000 508.820 534.261
23 Pipa Hitam 4"
Kelas Medium Dia Batang 559.000 575.770 604.559
24 Pipa Hitam 5"
Kelas Medium Dia Batang 825.500 850.265 892.778
Pipa PVC 6" Dia 1 Batang
25 (D) 22.750 23.433 24.604
Pipa PVC 1/2"Sekualitas Batang
26 (D) Dia 30.550 31.467 33.040
Maspion
2"Sekualitas
Maspion
Pipa PVC Batang
27 (D) Dia 2 45.500 46.865 49.208
Pipa PVC 1/2"Sekualitas Batang
28 (D) Dia 63.050 64.942 68.189
Maspion
3"Sekualitas
Maspion
Pipa PVC Batang
29 (D) Dia 89.050 91.722 96.308
Pipa PVC 4"Sekualitas Batang
30 (D) Dia 149.500 153.985 161.684
Maspion
5"Sekualitas
31 Pipa PVC Pralon S-10 - Dia M" 3.250 3.348 3.515
Maspion
1/2"
32 Pipa PVC Pralon S-10 - Dia M" 4.940 5.088 5.343
33 Pipa PVC 3/4"
Pralon S-10 - Dia M" 8.060 8.302 8.717
34 Pipa PVC 1"
Pralon S-10 - Dia M" 11.830 12.185 12.794
35 Pipa PVC 1 1/4" S-10 - Dia
Pralon M" 18.590 19.148 20.105
36 Pipa PVC 1 1/2" S-10 - Dia
Pralon M" 28.860 29.726 31.212
37 Pipa PVC 2"
Pralon S-10 - Dia M" 41.210 42.446 44.569
38 Pipa PVC 2 1/2" S-10 - Dia
Pralon M" 59.020 60.791 63.830
39 Pipa PVC 3"
Pralon S-10 - Dia M" 88.530 91.186 95.745
40 Pipa PVC 4"
Pralon S-10 - Dia M" 141.830 146.085 153.389
41 Pipa PVC 5"
Pralon S-10 - Dia M" 186.680 192.280 201.894
42 Pipa PVC 6"
Pralon S-10 - Dia M" 290.680 299.400 314.370
43 Pipa PVC 8"
Pralon S-12,5-RRJ M" 23.790 24.504 25.729
44 Pipa PVC Dia 2" S-12,5-RRJ
Pralon M" 33.670 34.680 36.414
45 Pipa PVC Dia 2 1/2"
Pralon S-12,5-RRJ M" 48.750 50.213 52.723
46 Pipa PVC Dia 3" S-12,5-RRJ
Pralon M" 71.370 73.511 77.187
47 Pipa PVC Dia 4" S-12,5-RRJ
Pralon M" 116.220 119.707 125.692
48 Pipa PVC Dia 5" S-12,5-RRJ
Pralon M" 152.880 157.466 165.340
49 Pipa PVC Dia 6" S-12,5-RRJ
Pralon M" 236.210 243.296 255.461
50 Pipa PVC Dia 8" S-12,5-RRJ
Pralon M" 369.070 380.142 399.149
51 Pipa PVC Dia 10"S-12,5-RRJ
Pralon M" 589.680 607.370 637.739
52 Pipa GIP Dia 12" Kias
Medium Batang 209.300 215.579 226.358
53 Pipa GIP A,Dia
Medium1" Kias Batang 260.000 267.800 281.190
54 Pipa GIP A,Dia
Medium1 1/4"
Kias Batang 299.000 307.970 323.369
55 Pipa GIP A,Dia
Medium1 1/2"
Kias Batang 442.000 455.260 478.023
56 Pipa GIP A,Dia 2" Kias
Medium Batang 91.260 93.998 98.698
57 Pipa GIP B,Dia
Medium1/2"
Kias Batang 118.300 121.849 127.941
58 Pipa GIP B,Dia 3/4"
Medium Kias Batang 134.030 138.051 144.953
59 Pipa GIP B,Dia
Medium1" Kias Batang 172.250 177.418 186.288
60 Pipa GIP B,Dia 1 1/4"
Medium Kias Batang 193.960 199.779 209.768
61 Pipa GIP B,Dia
Medium1 1/2"
Kias Batang 266.500 274.495 288.220
62 Pipa GIP B,Dia
Medium2" Kias Batang 409.500 421.785 442.874
63 Pipa GIP B,Dia 3" Kias
Medium Batang 499.200 514.176 539.885
64 Pipa GIP B,Dia
Medium4" Kias Batang 653.900 673.517 707.193
65 Pipa GIP B,Dia 5" Kias
Medium Batang 851.500 877.045 920.897
66 Pipa GIP B,Dia
Medium6" Kias Batang 1,244,750 1,282,093 1,346,197
67 Pipa HDPE (SDR 11 PN 16) B,Dia
630 mm8" 24" M' 6,867,070 7,073,082 7,426,736
68 Pipa HDPE (SDR 11 PN 16) 560 mm 22" M' 5,419,960 5,582,559 5,861,687
69 Pipa HDPE (SDR 11 PN 16) 500 mm 20" M' 4,326,280 4,456,068 4,678,872
70 Pipa HDPE (SDR 11 PN 16) 450 mm 18" M' 3,507,000 3,612,210 3,792,821
71 Pipa HDPE (SDR 11 PN 16) 400 mm 16" M' 2,768,850 2,851,916 2,994,511
72 Pipa HDPE (SDR 11 PN 16) 355 mm 14" M' 2,180,780 2,246,203 2,358,514
73 Pipa HDPE (SDR 11 PN 16) 315 mm 12" M' 1,720,040 1,771,641 1,860,223
74 Pipa HDPE (SDR 11 PN 16) 280 mm 10" M' 1,357,440 1,398,163 1,468,071
75 Pipa HDPE (SDR 11 PN 16) 250 mm 10" M' 1,083,810 1,116,324 1,172,141
76 Pipa HDPE (SDR 11 PN 16) 225 mm 8" M' 880.390 906.802 952.142
77 Pipa HDPE (SDR 11 PN 16) 200 mm 8" M' 695.450 716.314 752.129
78 Pipa HDPE (SDR 11 PN 16) 180 mm 6" M' 564.060 580.982 610.031
79 Pipa HDPE (SDR 11 PN 16) 160 mm 6" M' 446.250 459.638 482.619
80 Pipa HDPE (SDR 11 PN 16) 140 mm 5" M' 339.920 350.118 367.623
81 Pipa HDPE (SDR 11 PN 16) 125 mm 5" M' 272.790 280.974 295.022
82 Pipa HDPE (SDR 11 PN 16) 110 mm 4" M' 210.210 216.516 227.342
83 Pipa HDPE (SDR 11 PN 16) 90 mm 3" M' 141.820 146.075 153.378
84 Pipa HDPE (SDR 11 PN 16) 75 mm 2 1/2" M' 97.860 100.796 105.836
85 Pipa HDPE (SDR 11 PN 16) 63 mm 2" M' 70.070 72.172 75.781
86 Pipa HDPE (SDR 11 PN 16) 50 mm 1 1/2" M' 44.310 45.639 47.921
87 Pipa HDPE (SDR 11 PN 16) 40 mm 1 1/4" M' 28.560 29.417 30.888
88 Pipa HDPE (SDR 11 PN 16) 32 mm 1" M' 18.480 19.034 19.986
89 Pipa HDPE (SDR 11 PN 16) 25 mm 3/4" M' 11.340 11.680 12.264
90 Pipa HDPE (SDR 11 PN 16) 20 mm 1/2" M' 8.820 9.085 9.539
91 Pipa HDPE (SDR 13.6 PN 12.5) 630 mm 24" M' 5,673,570 5,843,777 6,135,966
92 Pipa HDPE (SDR 13.6 PN 12.5) 560 mm 22" M' 4,484,550 4,619,087 4,850,041
93 Pipa HDPE (SDR 13.6 PN 12.5) 500 mm 20" M' 3,573,150 3,680,345 3,864,362
94 Pipa HDPE (SDR 13.6 PN 12.5) 450 mm 18" M' 2,897,510 2,984,435 3,133,657
95 Pipa HDPE (SDR 13.6 PN 12.5) 400 mm 16" M' 2,288,860 2,357,526 2,475,402
96 Pipa HDPE (SDR 13.6 PN 12.5) 355 mm 14" M' 1,804,320 1,858,450 1,951,372
97 Pipa HDPE (SDR 13.6 PN 12.5) 315 mm 12" M' 1,421,210 1,463,846 1,537,039
98 Pipa HDPE (SDR 13.6 PN 12.5) 280 mm 10" M' 1,120,630 1,154,249 1,211,961
99 Pipa HDPE (SDR 13.6 PN 12.5) 250 mm 10" M' 895.510 922.375 968.494
100 Pipa HDPE (SDR 13.6 PN 12.5) 225 mm 8" M' 727.580 749.407 786.878
101 Pipa HDPE (SDR 13.6 PN 12.5) 200 mm 8" M' 572.880 590.066 619.570
102 Pipa HDPE (SDR 13.6 PN 12.5) 180 mm 6" M' 467.180 481.195 505.255
103 Pipa HDPE (SDR 13.6 PN 12.5) 160 mm 6" M' 368.060 379.102 398.057
104 Pipa HDPE (SDR 13.6 PN 12.5) 140 mm 5" M' 281.960 290.419 304.940
105 Pipa HDPE (SDR 13.6 PN 12.5) 125 mm 5" M' 225.190 231.946 243.543
106 Pipa HDPE (SDR 13.6 PN 12.5) 110 mm 4" M' 174.720 179.962 188.960
107 Pipa HDPE (SDR 13.6 PN 12.5) 90 mm 3" M' 118.020 121.561 127.639
108 Pipa HDPE (SDR 13.6 PN 12.5) 75 mm 2 1/2" M' 82.320 84.790 89.029
109 Pipa HDPE (SDR 13.6 PN 12.5) 63 mm 2" M' 58.170 59.915 62.911
110 Pipa HDPE (SDR 13.6 PN 12.5) 50 mm 1 1/2" M' 36.470 37.564 39.442
111 Pipa HDPE (SDR 17 PN 10) 630 mm 24" M' 4,644,570 4,783,907 5,023,102
112 Pipa HDPE (SDR 17 PN 10) 560 mm 22" M' 3,675,910 3,786,187 3,975,497
113 Pipa HDPE (SDR 17 PN 10) 500 mm 20" M' 2,925,370 3,013,131 3,163,788
114 Pipa HDPE (SDR 17 PN 10) 450 mm 18" M' 2,374,820 2,446,065 2,568,368
115 Pipa HDPE (SDR 17 PN 10) 400 mm 16" M' 1,874,390 1,930,622 2,027,153
116 Pipa HDPE (SDR 17 PN 10) 355 mm 14" M' 1,483,020 1,527,511 1,603,886
117 Pipa HDPE (SDR 17 PN 10) 315 mm 12" M' 1,165,430 1,200,393 1,260,413
118 Pipa HDPE (SDR 17 PN 10) 280 mm 10" M' 920.290 947.899 995.294
119 Pipa HDPE (SDR 17 PN 10) 250 mm 10" M' 732.550 754.527 792.253
120 Pipa HDPE (SDR 17 PN 10) 225 mm 8" M' 597.730 615.662 646.445
121 Pipa HDPE (SDR 17 PN 10) 200 mm 8" M' 471.240 485.377 509.646
122 Pipa HDPE (SDR 17 PN 10) 180 mm 6" M' 381.990 393.450 413.122
123 Pipa HDPE (SDR 17 PN 10) 160 mm 6" M' 301.980 311.039 326.591
124 Pipa HDPE (SDR 17 PN 10) 140 mm 5" M' 231.350 238.291 250.205
125 Pipa HDPE (SDR 17 PN 10) 125 mm 5" M' 184.310 189.839 199.331
126 Pipa HDPE (SDR 17 PN 10) 110 mm 4" M' 144.480 148.814 156.255
127 Pipa HDPE (SDR 17 PN 10) 90 mm 3" M' 97.090 100.003 105.003
128 Pipa HDPE (SDR 17 PN 10) 75 mm 2 1/2" M' 67.550 69.577 73.055
129 Pipa HDPE (SDR 17 PN 10) 63 mm 2" M' 47.880 49.316 51.782
130 Pipa HDPE (SDR 17 PN 10) 50 mm 1 1/2" M' 30.030 30.931 32.477
131 Pipa HDPE (SDR 21 PN 8) 630 mm 24" M' 3,781,820 3,895,275 4,090,038
132 Pipa HDPE (SDR 21 PN 8) 560 mm 22" M' 2,990,470 3,080,184 3,234,193
133 Pipa HDPE (SDR 21 PN 8) 500 mm 20" M' 2,391,970 2,463,729 2,586,916
134 Pipa HDPE (SDR 21 PN 8) 450 mm 18" M' 1,938,860 1,997,026 2,096,877
135 Pipa HDPE (SDR 21 PN 8) 400 mm 16" M' 1,533,070 1,579,062 1,658,015
136 Pipa HDPE (SDR 21 PN 8) 355 mm 14" M' 1,202,530 1,238,606 1,300,536
137 Pipa HDPE (SDR 21 PN 8) 315 mm 12" M' 946.960 975.369 1,024,137
138 Pipa HDPE (SDR 21 PN 8) 280 mm 10" M' 753.620 776.229 815.040
139 Pipa HDPE (SDR 21 PN 8) 250 mm 10" M' 597.170 615.085 645.839
140 Pipa HDPE (SDR 21 PN 8) 225 mm 8" M' 487.830 502.465 527.588
141 Pipa HDPE (SDR 21 PN 8) 200 mm 8" M' 385.980 397.559 417.437
142 Pipa HDPE (SDR 21 PN 8) 180 mm 6" M' 311.570 320.917 336.963
143 Pipa HDPE (SDR 21 PN 8) 160 mm 6" M' 247.940 255.378 268.147
144 Pipa HDPE (SDR 21 PN 8) 140 mm 5" M' 189.070 194.742 204.479
145 Pipa HDPE (SDR 21 PN 8) 125 mm 5" M' 150.990 155.520 163.296
146 Pipa HDPE (SDR 21 PN 8) 110 mm 4" M' 118.160 121.705 127.790
147 Pipa HDPE (SDR 21 PN 8) 90 mm 3" M' 78.750 81.113 85.168
148 Pipa HDPE (SDR 21 PN 8) 75 mm 2 1/2" M' 54.880 56.526 59.353
149 Pipa HDPE (SDR 26 PN 6.3) 630 mm 24" M' 3,075,800 3,168,074 3,326,478
150 Pipa HDPE (SDR 26 PN 6.3) 560 mm 22" M' 2,427,460 2,500,284 2,625,298
151 Pipa HDPE (SDR 26 PN 6.3) 500 mm 20" M' 1,936,550 1,994,647 2,094,379
152 Pipa HDPE (SDR 26 PN 6.3) 450 mm 18" M' 1,569,960 1,617,059 1,697,912
153 Pipa HDPE (SDR 26 PN 6.3) 400 mm 16" M' 1,241,590 1,278,838 1,342,780
154 Pipa HDPE (SDR 26 PN 6.3) 355 mm 14" M' 979.090 1,008,463 1,058,886
155 Pipa HDPE (SDR 26 PN 6.3) 315 mm 12" M' 775.740 799.012 838.963
156 Pipa HDPE (SDR 26 PN 6.3) 280 mm 10" M' 608.230 626.477 657.801
157 Pipa HDPE (SDR 26 PN 6.3) 250 mm 10" M' 488.390 503.042 528.194
158 Pipa HDPE (SDR 26 PN 6.3) 225 mm 8" M' 393.610 405.418 425.689
159 Pipa HDPE (SDR 26 PN 6.3) 200 mm 8" M' 312.900 322.287 338.401
160 Pipa HDPE (SDR 26 PN 6.3) 180 mm 6" M' 253.330 260.930 273.976
161 Pipa HDPE (SDR 26 PN 6.3) 160 mm 6" M' 201.460 207.504 217.879
162 Pipa HDPE (SDR 26 PN 6.3) 140 mm 5" M' 154.280 158.908 166.854
163 Pipa HDPE (SDR 26 PN 6.3) 125 mm 5" M' 122.710 126.391 132.711
164 Pipa HDPE (SDR 26 PN 6.3) 110 mm 4" M' 97.160 100.075 105.079
165 Pipa HDPE (SDR 26 PN 6.3) 90 mm 3" M' 64.190 66.116 69.421
166 Water Meter ø 1/2" (Standar PDAM) Buah 266.827 266.891 267.081
167 Pipa Galvanis ø 1/2" panjang 6 m Batang 191.453 192.405 193.040
168 Pipa Galvanis ø 3/4" panjang 6 m Batang 254.953 255.905 256.540
169 Pipa Galvanis Dia 1" Batang 388.830 400.495 420.520
170 Pipa Galvanis Dia 1 1/4" Batang 484.770 499.313 524.279
171 Pipa Galvanis Dia 1 1/2" Batang 585.780 603.353 633.521
172 Pipa Galvanis Dia 2" Batang 707.850 729.086 765.540
173 Pipa Galvanis Dia 2 1/2" Batang 903.110 930.203 976.713
174 Pipa Galvanis Dia 3" Batang 1,264,380 1,302,311 1,367,427
175 Pipa Galvanis Dia 4" Batang 1,670,890 1,721,017 1,807,068
176 Pipa Galvanis Dia 5" Batang 2,172,170 2,237,335 2,349,202
177 Pipa Galvanis Dia 6" Batang 2,389,400 2,461,082 2,584,136
178 Pipa Galvanis Dia 8" Batang 3,584,100 3,691,623 3,876,204
179 Valpe & Aksesories Dia 3/4" KITZ Batang 84.500 87.035 91.387
180 Valpe & Aksesories Dia 1" KITZ Batang 117.000 120.510 126.536
181 Valpe & Aksesories Dia 1 1/4" KITZ Batang 162.500 167.375 175.744
182 Valpe & Aksesories Dia 1 1/2" KITZ Batang 214.500 220.935 231.982
183 Valpe & Aksesories Dia 2" KITZ Batang 357.500 368.225 386.636
184 Pipa Slang PE Dia 1/2" M 6.000 6.180 6.489
185 Pipa Slang PE Dia 3/4" M 8.000 8.240 8.652
186 Pipa Slang PE Dia 1" M 5.500 5.665 5.948
187 Buias Beton Dia 20 Cm - 100 50.830 52.355 54.973
188 Buias Beton M
Dia 30 Cm - 100 66.430 68.423 71.844
189 Buias Beton M 40 Cm - 100
Dia 71.500 73.645 77.327
190 Buias Beton M
Dia 60 Cm - 100 123.500 127.205 133.565
191 Buias Beton M 80 Cm - 100
Dia 156.000 160.680 168.714
192 Buias Beton M
Dia 80 Cm - 0.50 84.500 87.035 91.387
193 Pipa Tanah M
Dia 15 Cm 15.600 16.068 16.871
194 Pipa Tanah Dia 20 Cm 26.000 26.780 28.119
195 Grevel Beton 1/2" Dia 20 Cm 32.500 33.475 35.149
196 Grevel Beton 1/2" Dia 30 Cm 39.000 40.170 42.179
197 Water Mor 1/2 Buah 32.703 33.655 34.290
198 Over Sock GI 1/2 Buah 6.033 6.985 7.620
199 Double Niple 1/2 " Buah 20.003 20.955 21.590
XIII BAHAN ELECTRICAL DAN MEKANIKAL
1 Instalasi listrik dan stop kontak, NYM 3x2.5 Titik 157.930 162.668 165.827
TBS
mm2 + pipa conduit Unit
2 236W CPR 759.985 782.785 797.984
TLD(2x36W)+COV Unit
3 TBS 318 218W CPR 703.800 724.914 738.990
ER
TLD(2X18W)+COV
4 TBH 318 236 TL 2 x 36 Unit 683.987 704.506 718.186
ER
5 DOWN LIGHT (WPL
+ 18
COVER
W) Unit 111.350 114.691 116.918
6 Lampu Ess 14W Unit 80.886 83.313 84.930
7 BARET BCS 22 W CLEAN ( 1 x Unit 453.050 466.642 475.703
8 TBS TLD TLE
( 2 x 22
18 W
W)) + COVER Unit 661.300 681.139 694.365
9 Lampu Down Light FBS 45 18 W Unit 188.292 193.941 197.707
10 Corridor Lamp NBY-4A unit 207.570 213.797 217.949
11 Lampu TL UV (1x36W), termasuk Unit 282.285 290.754 296.399
timer
12 Lampu Tanda Operasi Unit 190.171 195.876 199.679
13 Exhaust Fan 100 W termasuk Unit 618.579 637.136 649.508
14 Stop Kontak Ducting Unit 27.404 28.226 28.774
15 Saklar Tunggal Unit 14.034 14.455 14.735
16 Saklar Ganda Unit 44.974 46.323 47.222
17 Panel Penerangan + busbar,kabel kontrol, unit 1,020,680 1,051,300 1,071,714
18 assc.
Pilot lamp bh 13.813 14.227 14.503
19 Volt meter bh 59.670 61.460 62.654
20 Petanahan bh 290.700 299.421 305.235
21 TCH114/2005 / 865 LAMPU TIDUR (TL5 14 W) Unit 79.475 81.859 83.449
22 UPS on line 10KVA unit 41,995,950 43,255,829 44,095,748
23 Exit Lamp TL 10 W Unit 731.935 753.893 768.532
24 Nicad Bateray Unit 591.430 609.173 621.002
25 Stop Kontak, Water Heater termasuk Unit 2,771,255 2,854,393 2,909,818
26 Pengadaan
Panel160 x dan
70 xInstalasi Air panas kontrol,
50 + busbar,kabel unit 6,145,075 6,329,427 6,452,329
27 assc.
Pekerjaan Instalasi Pipa Refrigerant & Pipa Unit 425.000 437.750 446.250
28 Drain
Box 60ACx 40 x 20 + busbar,kabel kontrol, unit 468.350 482.401 491.768
29 assc.
Pemasangan Dudukan Outdoor, Indoor & ttk 2,907,000 2,994,210 3,052,350
30 Ongkos Pasang Ac Split
RAG, 16" x 16"`Linear bh 533.800 549.814 560.490
31 SAD, 24" x 24" Rainforced bh 808.138 832.382 848.544
12" X 24 " Linear
32 FAG bh 715.488 736.952 751.262
33 Volume Dumper, 100 x 100 mm bh 626.450 645.244 657.773
34 Boster Fan Low noice, PS 3,5 Bar, bh 3,036,200 3,127,286 3,188,010
35 Hepa Filter , 8000cfm
2000 cfm, Efisiensi bh 1,615,000 1,663,450 1,695,750
36 Exhaust Fan Low noice, 99,9%
PS 3,5 Bar, 3500 bh 2,099,500 2,162,485 2,204,475
37 Box cfm
60 x 40 x 20 unit 468.350 482.401 491.768
38 OV bh 1,211,250 1,247,588 1,271,813
39 ONAV bh 2,422,500 2,495,175 2,543,625
40 Gas Shavenging bh 403.750 415.863 423.938
41 Zone Valve typeIV bh 4,393,591 4,525,398 4,613,270
42 Zone Valve type II bh 2,650,122 2,729,625 2,782,628
43 Alarm system II bh 2,840,190 2,925,396 2,982,200
44 Alarm system III bh 4,177,283 4,302,601 4,386,147
45 Alarm system IV bh 5,704,163 5,875,288 5,989,371
46 Flowmeter bh 635.928 655.005 667.724
47 Wall Suction bh 2,092,207 2,154,973 2,196,817
48 Bed Head unit 1,679,600 1,729,988 1,763,580
49 Testing & Commisioning gas medis 50 call w/handset lot 3,187,500 3,283,125 3,346,875
Master Station unit 33,745,000 34,757,350 35,432,250
50 NEM-50A/7
30 call w/handset
Master Station unit 21,485,450 22,130,014 22,559,723
51 NEM-30A/C
24Volt PS-2420S
52 Power Supply unit 2,199,375 2,265,356 2,309,344
Bedside Call Switch unit
53 NBY-1A+ Receptacle 469.625 483.714 493.106
54 Ceiling Sub Speaker NBR-
NB-L unit 712.810 734.194 748.451
8A
55 Bathroom Pullcord NBR-7AS unit 96.475 99.369 101.299
56 Reset Call Button NAR-2A unit 179.265 184.643 188.228
57 Relay Module PC-359B unit 188.360 194.011 197.778
58 T-Dos National unit 29.070 29.942 30.524
59 Instalasi ITC Multicord 0.6mm2 dlm pipa Titik 145.350 149.711 152.618
60 PVC
Instalasi Nurse Call Titik 145.350 149.711 152.618
61 Testing & Commisioning Nurse Call unit 226.100 232.883 237.405
62 CD, DVD, MP3, MPEG4 unit 348.738 359.200 366.175
63 Microphone w/ Hand Stand + Chime TOA * : unit 2,076,737 2,139,039 2,180,574
64 EC-100M
Mixer Power Amplifier 120 Watt unit 2,016,625 2,077,124 2,117,456
65 Power Supply lot 697.366 718.286 732.234
66 Grounding System lot 290.700 299.421 305.235
67 Material Bantu dan Testing Comisioning alat lot 219.640 226.229 230.622
68 Utama
MaterialTata Suara
Bantu dan Testing Comisioning Tata lot 1,116,560 1,150,057 1,172,388
69 Suara
Instalasi Tata Suara ttk 208.973 215.242 219.421
70 TB Sound System unit 244.095 251.417 256.299
TOA 3W : ZS646R
71 Celling Speaker unit 129.727 133.619 136.213
72 Volume Control TOA : ZP-064 unit 121.329 124.969 127.395
73 Horn Speaker 15 W unit 522.997 538.686 549.146
74 PABx TD 600 , 10 Free slot, 100 unit 75,140,000 77,394,200 78,897,000
75 LCOT card 16 Port (Ext.
line card ) bh 7,594,776 7,822,619 7,974,514
76 DLC card 8 Port ( XDP card ) bh 4,381,657 4,513,106 4,600,739
77 ESLC card 16 Port ( SLT card ) bh 4,324,639 4,454,378 4,540,870
78 M-type power suplay unit bh 3,749,265 3,861,743 3,936,728
79 Switch Hub 24 Port, Cisco unit 2,541,500 2,617,745 2,668,575
80 Server setara HP unit 14,751,750 15,194,303 15,489,338
81 UPS off line 1 KVA unit 2,912,449 2,999,822 3,058,071
82 Digital Display Telp bh 1,664,241 1,714,168 1,747,453
83 Analogphone standart bh 152.159 156.723 159.766
kapasitas 100 pair
84 Box MDF lengkap dengan LSA unit 1,569,100 1,616,173 1,647,555
85 Terminal Box Telepon unit 332.826 342.811 349.467
86 Instalasi kabel UTP Cat 6 titik 363.035 373.926 381.187
87 Setting,Testing & Commisioning Instalasi ls 994.203 1,024,029 1,043,913
88 Telepon
Setting,Testing & Commisioning Instalasi ls 994.203 1,024,029 1,043,913
89 Datalet Data
Out RJ 45 titik 114.325 117.755 120.041
90 Hub 24 port bh 2,906,405 2,993,597 3,051,725
91 Antena Indovision unit 969.000 998.070 1,017,450
92 Antena UHF unit 1,615,000 1,663,450 1,695,750
93 Antena VHF unit 1,615,000 1,663,450 1,695,750
94 Master Head Amplifier unit 2,580,396 2,657,808 2,709,416
95 Single Chanell Amplifier unit 4,816,032 4,960,513 5,056,834
96 Active Combiner unit 3,486,938 3,591,546 3,661,285
97 Decoder unit 836.927 862.035 878.773
98 TV Modulator unit 906.653 933.852 951.985
99 Pasive Combiner unit 1,470,313 1,514,422 1,543,829
100 Booster Amplifier ( AC - 220 V ) c/w unit 596.700 614.601 626.535
Power Supply lot 2,231,658 2,298,608 2,343,241
101 Control Unit
102 Base Plate 10 Chanell Type IM - 05 lot 247.180 254.595 259.539
103 Rack Mounting Lokal set 1,952,756 2,011,339 2,050,394
104 Pengkabelan di Headend lot 3,230,000 3,326,900 3,391,500
105 Outlet TV bh 69.700 71.791 73.185
106 Coupler bh 281.010 289.440 295.061
107 Splitter bh 137.658 141.787 144.540
108 Instalasi MATV dgn kabel Coaxial 7C ttk 249.178 256.653 261.636
109 Digital Video Recording Impact 16 Chanel Unit 4,887,500 5,034,125 5,131,875
110 withMonitor
TV Hard Disk 500GB LG XD 29 Inch Unit 2,567,689 2,644,719 2,696,073
111 Power Supply lot 1,283,789 1,322,303 1,347,978
112 Camera Site IRD-5301S2 Unit 1,715,734 1,767,206 1,801,520
113 MCFA Semi addressible 20 Zone c/w battery Unit 16,906,500 17,413,695 17,751,825
114 & chargeUPS
Battery ( 2 Battery + 2 Set 607.750 625.983 638.138
115 Panel Annunciator Accu ) Unit 4,961,450 5,110,294 5,209,523
116 Material Bantu Fire Alarm Ls 1,008,143 1,038,387 1,058,550
117 Testing & Commissioning Fire Alarm Ls 1,560,558 1,607,374 1,638,585
118 Terminal Box Fire Alarm Unit 359.125 369.899 377.081
119 Smoke Detector Buah 434.265 447.293 455.978
120 ROR Heat Detector Buah 64.808 66.752 68.049
121 Pengkabelan dari MDF-FA ke TB-FA m' 50.448 51.961 52.970
122 Instalasi Fire Alarm Titik 135.915 139.992 142.711
123 Fire Extingusher Dry Chemical 6 kg Unit 2,321,605 2,391,253 2,437,685
124 Electrik pump, Q=2000 l/mnt, H= unit 95,493,930 98,358,748 100,268,62
125 Diesel pump 80m,
Q=2000 l/mnt, H= unit 244,343,295 251,673,59 7
256,560,46
126 Jocky pump 80 m,
Q= 200 l/mnt, H unit 4
43,227,005 44,523,815 0
45,388,355
127 Pressure tank kap. 1000 liter = 60 m unit 20,442,500 21,055,775 21,464,625
128 Safety valve/ARV bh 5,927,883 6,105,719 6,224,277
129 pressure swith bh 580.457 597.870 609.479
130 pressure gauge bh 174.369 179.600 183.087
131 Gate Valve 1/2`` bh 366.605 377.603 384.935
132 Gate Valve 11/2" bh 1,392,385 1,434,157 1,462,004
133 Gate Valve 2`` bh 2,037,620 2,098,749 2,139,501
134 Gate Valve 2 1/2" Unit 3,385,465 3,487,029 3,554,738
135 Gate Valve 3`` bh 5,084,955 5,237,504 5,339,203
136 Gate Valve 4`` bh 6,331,820 6,521,775 6,648,411
137 Check Valve 3`` bh 3,341,775 3,442,028 3,508,864
138 Check Valve 4`` bh 6,558,685 6,755,446 6,886,619
139 Foot Valve 3`` bh 1,429,649 1,472,538 1,501,131
140 Foot Valve 4`` bh 1,830,654 1,885,573 1,922,186
141 Flexible Pipe 3`` bh 345.202 355.558 362.462
142 Flexible Pipe 4`` bh 394.043 405.864 413.745
143 Strainer 3`` bh 5,412,375 5,574,746 5,682,994
144 Strainer 4`` bh 6,765,469 6,968,433 7,103,742
145 Priming tank 200 liter, kran dan GIP 1/2 `` unit 2,963,942 3,052,860 3,112,139
146 ARV 6`` bh 3,312,569 3,411,946 3,478,197
147 Fitting Rumah Pompa Fire Hidrant Ls 7,752,000 7,984,560 8,139,600
148 HBI (80x18x100) unit 4,384,130 4,515,654 4,603,337
4x2 1/2``x 2 1/2``
149 Siamese Connection bh 2,545,478 2,621,842 2,672,752
150 head sprinkler ,ex Viking bh 42.628 43.906 44.759
151 flow swith 4`` bh 849.830 875.325 892.322
152 Lift hospital & fire Service" Louser" Unit 648,669,000 668,129,07 681,102,45
153 Unit ELD by UPS Unit 10,884,250 011,210,778 0
11,428,463
154 Biaya Pemasangan Unit Lift Unit 17,000,000 17,510,000 17,850,000
155 Testing, Commissioning, Training dan Unit 16,150,000 16,634,500 16,957,500
156 Perijinan Lift
Penangkal Petir tipe electro static non radio unit 10,982,000 11,311,460 11,531,100
157 aktif
SleeveRadius 125 m
connector unit 190.570 196.287 200.099
158 Counter sticking unit 339.150 349.325 356.108
159 Foot Valve Unit 435.149 448.203 456.906
160 Pekerjaan Ground Water Tank kapasitas 48. Unit 170,684,475 175,805,00 179,218,69
161 m3
Pompa Transfer tipe CR,Termasuk Otomatis Unit 10,331,750 910,641,703 9
10,848,338
162 Chek valve Unit 3,341,775 3,442,028 3,508,864
163 Pipa Gip 6`` m 766.615 789.613 804.946
164 Pipa Gip dia 4`` m 478.465 492.819 502.388
165 Pipa Gip dia 21/2`` m 255.850 263.526 268.643
166 Pipa Header 4" ls 1,046,104 1,077,487 1,098,409
167 Pipa Galvanis 11/2 " m 146.965 151.374 154.313
168 Pipa Kuras Galvanis 11/2 " m 146.965 151.374 154.313
169 Roof Tank kapasitas 12 m3 Unit 63,781,875 65,695,331 66,970,969
170 Roof Tank kapasitas 8 m3 Unit 42,521,250 43,796,888 44,647,313
171 Pompa Boster tipe CR Unit 8,870,855 9,136,981 9,314,398
172 Pipa PPR PN-10 Dia 3" m 292.145 300.909 306.752
173 Pipa PPR PN-10 Dia. 2 1/2" m 202.385 208.457 212.504
174 Pipa PPR PN-10 Dia. 2" m 144.670 149.010 151.904
175 Pipa PPR PN-10 Dia. 1 1/2" m 91.375 94.116 95.944
176 Pipa PPR PN-10 Dia. 1" m 37.145 38.259 39.002
177 Pipa PPR PN-10 Dia. 3/4 " m 23.120 23.814 24.276
178 Pipa PPR PN-10 Dia. 1/2" m 17.680 18.210 18.564
179 Pipa PVC Type AW 1" m 14.280 14.708 14.994
180 Pipa PVC Type AW 2" m 31.705 32.656 33.290
181 Pipa PVC Type AW 3" m 62.305 64.174 65.420
182 Pipa PVC Type AW 4" m 103.275 106.373 108.439
183 Pipa PVC Type AW 6" m 239.955 247.154 251.953
184 Pipa PVC Type AW 8" m 402.730 414.812 422.867
Pipa PVC m
185 Type AW 8" 402.730 414.812 422.867
186 pipa cabang SCH 40, termasukdia 4``
ASTM53 m 516.885 532.392 542.729
penyambungan ke
187 pipa cabang SCH 40, ASTM53 dia 3``
IPAL Eksisting m 371.450 382.594 390.023
188 pipa cabang SCH 40, ASTM53 dia 2.5` m 278.460 286.814 292.383
189 pipa cabang SCH 40, ASTM53 dia 2`` m 174.930 180.178 183.677
190 pipa cabang SCH 40, ASTM53 dia 1 m 138.125 142.269 145.031
191 pipa cabang SCH 40, 1/2`
ASTM53 dia 1`` m 80.835 83.260 84.877
ASTM53 dia 3/4``
192 pipa cabang SCH 40, m 54.485 56.120 57.209
193 Material bantu dan test comissioning ls 1,712,495 1,763,870 1,798,120
194 Instalasi Air Bersih
Material bantu dan test comissioning ls 1,371,603 1,412,751 1,440,183
Instalasi Air Kotor
195 Bak Kontrol Unit 578.808 596.172 607.748
196 Bak Penampungan Unit 8,911,443 9,178,786 9,357,015
197 Sumur Resapan ls 6,375,000 6,566,250 6,693,750
198 Sewage Pump Unit 8,666,728 8,926,729 9,100,064
199 Fitting dan Accessories Pemipaan Air Hujan ls 1,650,318 1,699,827 1,732,833
200 Material bantu dan test comissioning ls 1,538,628 1,584,786 1,615,559
201 Instalasi
Roof DrainPipa Air Hujan Dia. 4" buah 224.825 231.570 236.066
202 Ampere meter + CT 0 - 1000 A bh 110.500 113.815 116.025
203 Arde BC 70 mm2 3 ohm unit 2,096,738 2,159,640 2,201,574
204 Arde BC 50 mm2 3 ohm unit 2,096,738 2,159,640 2,201,574
205 Kabel feeder induk UTP Cat 6 m 36.805 37.909 38.645
206 Kabel coaxial 2X35 mm2 m' 115.005 118.455 120.755
207 Tray Cable ukuran 20 cm m 182.835 188.320 191.977
208 Tray Cable ukuran 40 cm m 194.480 200.314 204.204
209 Tray Cable ukuran 50 x 600 m 119.298 122.876 125.262
210 Kabel coaxial mm
2 x 35 mm2 m' 115.005 118.455 120.755
211 NYY 4x10 mm2 dari m 67.065 69.077 70.418
212 NYY SDP
4 x 16 mm2 dari m 73.780 75.993 77.469
213 NYY SDP
4x25 mm2 dari m 107.525 110.751 112.901
214 NYY SDP
4x50 mm2 dari m 219.980 226.579 230.979
215 NYY SDP
4x35 mm2 dari m 141.270 145.508 148.334
4x1x95 mm2 dari
NYY SDP ke MDP m'
216 SDP
4x1x185 mm2 dari 361.590 372.438 379.670
NYY m'
217 SDP ke MDP 680.850 701.276 714.893
218 Kabel NYY 4 x 150 mm2 m' 523.430 539.133 549.602
219 Kabel NYY 8 x 1 x 240 mm2 m' 1,786,955 1,840,564 1,876,303
220 Copper Tube 2 1/2" mtr 433.500 446.505 455.175
221 Copper Tube 1 1/2" mtr 218.450 225.004 229.373
222 Copper Tube 3" mtr 466.650 480.650 489.983
223 Copper Tube 2" mtr 405.450 417.614 425.723
224 Copper Tube 1 1/4" mtr 188.700 194.361 198.135
225 Copper Tube 3/8" mtr 47.600 49.028 49.980
226 Copper Tube 1/2" mtr 60.350 62.161 63.368
227 Copper Tube 3/4" mtr 109.650 112.940 115.133
228 Copper Tube 1" mtr 137.700 141.831 144.585
229 Copper Tube 5/8" mtr 88.400 91.052 92.820
230 Copper Tube 11/4" mtr 442.000 455.260 464.100
231 CD/MMC/USB Player with FM Tunner,Z- unit 1,378,870 1,420,236 1,447,814
232 CD2011R
Remote Mic 10Ch, VR-1010 unit 2,821,320 2,905,960 2,962,386
233 Speker Selector unit 1,642,200 1,691,466 1,724,310
234 Mixer Frame w/Module,V- unit 7,257,470 7,475,194 7,620,344
235 Power Amplifier 1000B
240W, ZP-2240 lot 2,810,100 2,894,403 2,950,605
236 Cabinet Rack w/Acc, CR-392P lot 9,980,700 10,280,121 10,479,735
TOA 5W : ZS646R
237 Celling Speaker unit 110.118 113.421 115.623
238 Penyambungan Telepon ke Peralatan Utama Ls 3,959,130 4,077,904 4,157,087
239 ke Gedung
Alarm Bell Eksisting Buah 241.613 248.861 253.693
240 Flow switch Buah 275.188 283.443 288.947
241 Ground Water Tank kapasitas 48 m3 Unit 170,684,475 175,805,00 179,218,69
242 Pipa Kuras Pipa PPR PN-10 Dia 2" m 144.670 9 149.010 9 151.904
243 Roof Tank kapasitas 24 m3 ls 95,306,250 98,165,438 100,071,56
244 Bak Kontrol / Penampungan Unit 578.808 596.172 3 607.748
245 Sewwage pump Unit 8,666,728 8,926,729 9,100,064
246 Grease Trap Unit 1,495,235 1,540,092 1,569,997
247 Penyambungan MATV ke Peralatan Utama ke Ls 630.360 649.271 661.878
248 Gedung Eksisting
Penyambungan Fire Alarm ke Peralatan Ls 2,333,250 2,403,248 2,449,913
249 Utama ke Gedung
Fitting dan Eksisting
Accessories Pemipaan Air Bersih ls 4,176,900 4,302,207 4,385,745
250 Fitting dan Accessories Pemipaan Air Kotor ls 1,752,743 1,805,325 1,840,380
2 x 36 W + COVER
251 TBH TLD Unit 683.987 704.506 718.186
252 TBS TLD 2 x 36 W + COVER Unit 759.985 782.785 797.984
253 Lampu Down Light PL 18 W Unit 111.350 114.691 116.918
254 Surge Arrester PF 40,3 P+ N bh 1,454,690 1,498,331 1,527,425
2XCDMT, 2x70W
255 MBX500 Unit 237.796 244.930 249.686
256 MBS145 1XCDMT 35W Unit 190.171 195.876 199.679
257 MCB 6A/6KA bh 114.410 117.842 120.131
258 MCB 6A/10KA bh 222.615 229.293 233.746
259 MCB 10A/6KA bh 114.410 117.842 120.131
260 MCB 10A/8KA bh 76.883 79.189 80.727
261 MCCB 10A / 18kA unit 774.265 797.493 812.978
262 MCCB 15A/10KA bh 222.615 229.293 233.746
263 MCB 16A / 6kA unit 114.410 117.842 120.131
264 MCB 20A / 5 KA unit 123.675 127.385 129.859
265 MCB 20A / 6kA unit 123.675 127.385 129.859
266 MCB 20A/8KA bh 242.420 249.693 254.541
267 MCB 20A/10KA unit 242.420 249.693 254.541
268 MCB 25 A / 5 KA unit 130.220 134.127 136.731
269 MCB 25A / 10 KA unit 242.420 249.693 254.541
270 MCCB 20A / 5 KA bh 413.100 425.493 433.755
271 MCCB 20A / 10 KA bh 688.755 709.418 723.193
25 A / 10 KA, 3P
272 MCCB bh 688.755 709.418 723.193
273 MCCB 25A/10KA bh 688.755 709.418 723.193
274 MCCB 30A / 10 KA bh 813.110 837.503 853.766
275 MCCB 35A / 10 KA, 3P unit 813.110 837.503 853.766
276 MCCB 50 A / 10KA, 3P bh 908.140 935.384 953.547
277 MCCB 60A / 10 KA bh 908.140 935.384 953.547
278 MCCB 60 A / 10KA, 3P bh 908.140 935.384 953.547
279 MCCB 80 A / 18KA, 3P bh 692.240 713.007 726.852
80 A / 10 KA, 3P
280 MCCB unit 553.860 570.476 581.553
100 A / 18 KA, 3P
281 MCCB bh 695.300 716.159 730.065
282 MCCB 125A / 18 KA bh 1,085,280 1,117,838 1,139,544
125A / 18 KA, 3P
283 MCCB unit 1,085,280 1,117,838 1,139,544
125A / 25 KA, 3P
284 MCCB unit 1,568,590 1,615,648 1,647,020
285 MCCB 200A / 25 KA bh 2,172,643 2,237,822 2,281,275
286 MCCB 300A / 25 KA bh 2,172,643 2,237,822 2,281,275
300A / 36 KA, 3P
287 MCCB bh 2,172,643 2,237,822 2,281,275
288 MCCB 400A/36KA, 3P unit 2,670,020 2,750,121 2,803,521
289 MCCB 500 A / 36 KA ,3 bh 7,369,075 7,590,147 7,737,529
500A
PH / 36 KA, 3P
290 MCCB bh 7,369,075 7,590,147 7,737,529
1000A / 50KA ,4P
291 MCCB bh 14,241,665 14,668,915 14,953,748
292 Arde BC 25 mm2 3 ohm unit 2,228,828 2,295,692 2,340,269
293 Moveable Suction Unit bh 6,460,000 6,653,800 6,783,000
294 Panel 200 x 240 x 100 + busbar,kabel kontrol, unit 54,252,610 55,880,188 56,965,241
295 assc.
ACB 1250 A / 65KA , bh 38,447,583 39,601,010 40,369,962
296 Amperemeter 0 s/d 3000 A, CT 3000 A / 5A bh 290.700 299.421 305.235
297 SAD, 12" x 80" Rainforced bh 193.928 199.745 203.624
14" X 20 " Linear
298 FAG bh 294.015 302.835 308.716
299 RAG 16" x 24" bh 122.103 125.766 128.208
300 Boster Fan Low noice, Preasure Static 750 6000 cfm daya 1,5 bh 6,157,230 6,341,947 6,465,092
301 Pa,
Exhause Fan, Preasure Static 200 Pa, KW
5000 cfm daya 1 bh 4,178,855 4,304,221 4,387,798
302 Hepa Filter , 6000 cfm, Efisiensi 99,9% KW bh 5,955,355 6,134,016 6,253,123
(Material
Ceiling Module unit 4,392,800 4,524,584 4,612,440
303 Bantu &) Testing Commissioning
304 Pemasangan Ac Split Duct
Ducting 14"x20" m 367.030 378.041 385.382
305 Ducting 20"x30" m 539.750 555.943 566.738
306 Ducting 20"x26" m 496.570 511.467 521.399
307 Ducting 20"x24" m 474.980 489.229 498.729
308 Ducting 14"x16" m 323.850 333.566 340.043
309 Ducting 10"x14" m 259.080 266.852 272.034
310 Ducting 12"x24" m 388.620 400.279 408.051
311 Ducting 20"x12" m 345.440 355.803 362.712
312 Ducting 12"x12" m 259.080 266.852 272.034
313 Ducting 16"x30" m 496.570 511.467 521.399
314 Ducting 16"x20" m 388.620 400.279 408.051
315 Out Let Gas Oxigen bh 646.000 665.380 678.300
316 Out Let Gas Vacum bh 646.000 665.380 678.300
317 Outlet Gas Compres bh 646.000 665.380 678.300
318 Outlet Gas Nitrogen bh 646.000 665.380 678.300
319 Network Disk Recorder 16 ch unit 7,329,253 7,549,130 7,695,715
320 LCD monitor 24 '' bh 1,550,400 1,596,912 1,627,920
321 control keyboard bh 1,225,148 1,261,902 1,286,405
322 Vidio doorphone colour bh 2,204,348 2,270,478 2,314,565
323 Adaptor power supply bh 87.635 90.264 92.017
324 Frame bh 409.955 422.254 430.453
325 IP.Camera fixed type indoor ,IP,PoE bh 2,795,055 2,878,907 2,934,808
326 Instalasi cable CCTV m 222.870 229.556 234.014
327 Vitting Untuk Fire Sprikler ls 865.130 891.084 908.387
BAHAN LOKAL
I TANAH TIMBUNAN
1 Material Tanah Timb. Pilihan M3 80.231 80.231 80.231
2 Tanah Timbunan Biasa M3 78.326 78.326 78.326
II PASIR
1 Pasir Urug - M3 251.681 251.681 170.000
2 Pasir pasang - M3 251.681 251.681 170.000
3 Pasir Beton (Maligano) - M3 137.381 137.381 85.000
4 Pasir batu - M3 120.000 120.000 120.000
5 Pasir Pohara M3 400.000 412.000 420.000
III BATU
1 Batu Merah Biji 794 826 889
2 Kerikil Kali (Maligano) M3 220.000 220.000 220.000
3 Kerikil Pecah (Maligano Pecah manual) M3 283.431 283.431 220.000
4 Batu Gunung M3 143.731 143.731 143.731
5 Batu Gunung 0,5 - 1 cm (Pecah manual) M3 365.981 365.981 365.981
6 Batu Gunung 1 - 2 cm (Pecah manual) M3 315.181 315.181 315.181
7 Batu Gunung 2 - 3 cm (Pecah manual) M3 315.181 315.181 315.181
8 Batu Gunung 3 - 5 cm (Pecah manual) M3 283.431 283.431 283.431
9 Batu Gunung 5 - 7 cm (Pecah manual) M3 283.431 283.431 283.431
10 Batu Belah 15/25 – 25/35 cm - M3 62.500 70.000 75.000
11 Batu Belah 10 – 15 cm - M3 62.500 70.000 75.000
12 Batu Belah 5 – 7 cm - M3 220.000 240.000 290.000
13 Batu Pecah / Splite ½ - 2/3 cm - M3 65.000 70.000 80.000
14 Batu Pecah / Splite 5/7 cm - M3 100.000 110.000 120.000
15 Batu Pecah / Splite 1/1 cm - M3 200.000 200.000 200.000
16 Batu Pecah / Splite 10 – 15 cm - M3 110.000 105.000 100.000
17 Batu Pecah / Splite 5 – 7 cm - M3 220.000 190.000 120.000
18 Batu Pecah / Splite 3 – 4 cm - M3 220.000 220.000 220.000
19 Batu Pecah / Splite 2 – 3 cm - M3 275.000 220.000 220.000
20 Batu Pecah / Splite 1 - 2 cm - M3 250.000 220.000 220.000
21 Batu Pecah / Splite 0,5 – 1 cm - M3 220.000 220.000 220.000
22 Batu bata - Buah 550 1.300
23 Batu Belah 5/7 cm – 10/15 cm - M3 62.500 70.000 75.000
24 Batu Belah 15/20 cm – 20/25 cm - M3 62.500 70.000 75.000
25 Batu kali 5/7 cm – 10/15 cm - M3 62.500 70.000 75.000
26 Batu kali 15/20 cm – 20/25 cm - M3 45.500 55.000 60.000
27 Batu pecah 0,5/1 cm - M3 375.000 280.000 220.000
28 Batu pecah 1/1 cm - 1/2 cm - M3 325.000 280.000 220.000
29 Batu pecah 2/3 cm - 3/5 cm - M3 220.000 215.000 200.000
30 Material LPC ( Materia Alami / Sirtu ) - M3 4.000 4.500 5.000
IV PAVING BLOCK
1 Paving Block Pres Mesin Tek. 150 Kg M2 64.356 64.356 64.356
2 Paving Blok segi Delapan t = 6 cm, natural M2 41.600 42.848 44.990
3 Paving Blok segi Delapan t = 8 cm, natural M2 48.750 50.213 52.723
4 Paving Blok segi Enam t = 6 cm, natural M2 39.000 40.170 42.179
5 Paving Blok segi Enam t = 8 cm, natural M2 46.800 48.204 50.614
6 Batako Pres Manual M2 64.991 64.991 80.000
V BAHAN KAYU
1 Papan Kayu Klas II A (Sejenis) M3 2,317,750 2,349,500 2,349,500
2 Papan Kayu Klas II (Sejenis) M3 2,190,750 2,222,500 2,222,500
3 Papan Perancah M3 1,619,250 1,651,000 1,651,000
4 Balok Kayu Klas II A (Sejenis) M3 2,317,750 2,349,500 2,349,500
5 Balok Kayu Klas II (Sejenis) M3 1,682,750 1,714,500 1,714,500
6 Balok Perancah M3 1,682,750 1,714,500 1,714,500
7 Dolken Ø 5 Cm Batang 10.795 10.795 10.795
8 Dolken Ø 10 Cm Batang 38.735 38.735 38.735
9 Dolken Ø 15 Cm Batang 51.435 51.435 51.435
10 Bambu Tebal panjang 7 m Batang 45.085 45.085 45.085
11 Bambu Tipis panjang 7 m Batang 32.385 32.385 32.385
12 Batang Kelapa Batang 38.735 38.735 38.735
13 Atap nipa/alang-alang/kulit sagu Lembar 2.667 2.794 2.794
14 Ijuk Kg 36.068 36.195 36.195
VI BAHAN ASPAL
1 Aspal RMA Ton 1,841,500 1,968,500 2,095,500
2 Aspal Butur Cell Ton 1,682,750 1,809,750 1,936,750
3 Aspal Cement (AC) Liter 15.621 15.685 15.685
VII ALAT BANTU
1 Alat Bantu Set 1.905 1.905 1.905
2 Bangker Oli (BO) Liter 2.032 2.223 2.540
3 Majun / Lap Kg 27.000 27.000 27.000
4 Pompa Minyak Buah 304.500 313.635 319.725
HARGA JUAL BBM KEEKONOMIAN (NON SUBSIDI)
1 Minyak Solar HSD (Industri) + PPh Liter 17.812 18.002 18.320
2 Minyak Tanah/Kerosene Liter 18.261 18.451 18.769
3 Premium/Gasolene Liter 17.213 17.404 17.721
4 Minyak Solar HSD Bersubsidi Liter 7.500 7.500 8.000
5 Minyak Tanah/Kerosene Bersubsidi Liter 8.500 8.500 9.000
6 Premium/Gasolene Bersubsidi Liter 6.000 6.000 6.500
SEWA ALAT BERAT
1 Tired Roller 8 s/d 15 ton (MG) - Hari/buah 3,674,230 3,784,457 3,857,942
2 Hidrolic Excavator - Hari/buah 3,338,010 3,438,150 3,504,911
3 Dump Truck 3,5 ton - Hari/buah 500.000 515.000 525.000
4 Tandem Roller 6 s/d 8 ton - Hari/buah 2,000,000 2,060,000 2,100,000
5 Loader - Hari/buah 3,417,037 3,519,548 3,587,889
6 Greader Komatsu 145 HP - Hari/buah 2,477,978 2,552,317 2,601,877
7 Excavator on Track/ on Whell 0,30 M3 Perjam 417.251 429.769 438.114
8 Track / Whell Loader 1,50 M3 Perjam 488.153 502.798 512.561
9 Motor Grader 2,80 M Perjam 309.747 319.039 325.234
10 Pneumatic Tired Roller 6-8 Ton 6,00 Ton Perjam 238.435 245.588 250.357
11 Tandem / Three Roller 1 - 2 Ton 100,00 Ton Perjam 250.000 257.500 262.500
12 Tandem / Three Roller 3 - 4 Ton 3,00 Ton Perjam 250.000 257.500 262.500
13 Tandem / Three Roller 6 - 8 Ton 6,00 Ton Perjam 524.890 540.637 551.135
UPAH KERJA
1 Mandor Org/Hari 127.000 127.000 127.000
2 Kepala Tukang Org/Hari 152.400 152.400 152.400
3 Tukang
- Tukang Listrik Org/Hari 127.000 127.000 127.000
- Tukang Batu Org/Hari 127.000 127.000 127.000
- Tukang Kayu Org/Hari 127.000 127.000 127.000
- Tukang Besi Org/Hari 127.000 127.000 127.000
- Tukang Cat Org/Hari 127.000 127.000 127.000
4 Pekerja
- Pekerja Terlatih Org/Hari 95.250 95.250 95.250
- Pekerja Agak terlatih Org/Hari 95.250 95.250 95.250
- Pekerja Tak terlatih Org/Hari 95.250 95.250 95.250
5 Sopir Org/Hari 127.000 127.000 127.000
6 Pembantu Sopir Org/Hari 95.250 95.250 95.250
7 Operator Alat Berat Org/Hari 444.500 444.500 444.500
8 Pembantu Operator Alat Berat Org/Hari 127.000 127.000 127.000
9 Mekanik Org/Hari 190.500 190.500 190.500
10 Penjaga Malam Org/Hari 63.500 63.500 63.500
RENCANA ANGGARAN BIAYA (RAB)

KEGIATAN :
PEKERJAAN : PEMBANGUNAN MHUSOLLA
TAHUN ANGGARAN : 2018
LOKASI :

HARGA JUMLAH
No. URAIAN PEKERJAAN SATUAN VOLUME
SATUAN (Rp) HARGA (RP)

A. PEKERJAAN PENDAHULUAN
1 Pembersihan Lokasi Ls 1.00 300,000.00 300,000.00
2 Administrasi, Pelaporan dan Dokumentasi Ls 1.00 1,500,000.00 1,500,000.00
3 Pengukuran, Pas. Bouplank dan Barak Kerja Ls 1.00 3,500,000.00 3,500,000.00
Sub Total A 5,300,000.00
B. PEKERJAAN PEMB. MUSHOLLA
I. PEKERJAAN TANAH DAN PASIR
1 Galian Tanah Pondasi M3 13.23 85,804.38 1,135,191.88
2 Urugan Tanah Bekas Galian M3 2.50 28,596.59 71,462.88
3 Urugan Pasir Bawah Pondasi M3 1.47 381,641.53 561,013.05
4 Urugan Pasir Bawah Lantai M3 2.75 381,641.53 1,048,140.30
5 Urugan/Pemadatan Tanah Bawah Lantai M3 27.04 170,161.13 4,600,646.47
Sub Total B.I 7,416,454.58
II. PEKERJAAN PONDASI
1 Pek. Pas. Batu Kosong M3 4.41 478,313.74 2,109,363.60
2 Pek. Pas. Batu gunung 1 : 5 M3 10.78 825,782.41 8,901,934.42
Sub Total B.II 11,011,298.02
III. PEKERJAAN BETON
1 Pek. Sloop Beton 15/20 Cm, 1 : 2 : 3 M3 1.47 5,559,788.94 8,164,550.06
2 Pek. Ringbalk 15/15 Cm, 1 : 2 : 3 M1 48.95 135,378.85 6,626,794.70
3 Pek. Kolom Beton 15/15 Cm, 1 : 2 : 3 M3 1.93 6,739,110.08 13,028,047.61
4 Pek. Plat Beton bertulang 10 Cm, 1 : 2 : 3 M3 4.52 6,698,593.88
Sub Total B.III 19,654,842.31
IV. PEKERJAAN PASANGAN BATA, PLESTERAN & DINDING
1 Pek. Dinding Pas. Bata 1 : 5 M2 92.24 120,232.09 11,090,208.14
2 Pek. Plesteran Dinding 1 : 3 M2 184.48 77,013.96 14,207,535.79
3 Pek. List Profil Beton M1 44.16 - -
6 Pek. Pas. Dinding Batu Alam M2 5.61 397,857.75 2,232,777.67
4 Pek. Acian Dinding & Kolom M2 198.40 25,469.05 5,053,059.52
Sub Total B.III 32,583,581.13
V. PEKERJAAN ATAP
1 Pek. Kuda-kuda Rangka Kayu Kls II M3 0.63 5,066,934.50 3,198,370.66
2 Pek. Gording + Kaso + Reng Kayu Kls II M3 0.79 4,094,825.70 3,243,773.51
3 Pek. Atap Sakura Roof M2 53.05 113,901.75 6,042,624.52
4 Pek. Nok Sakura Roof M1 17.32 128,080.79 2,218,359.28
5 Pek. Lisplank Papan Kls II M1 34.48 79,968.70 2,757,320.78
6 Pek. Pas. Kubah Stainless Dia 60 cm BH 1.00
7 Pek. Pas. Kubah Stainless Dia 120 cm BH 4.00
Sub Total B.III 17,460,448.75
VI. PEKERJAAN LANTAI
1 Pek.Lantai Rabat Beton 1 : 3 : 5 M3 1.66 1,425,320.97 2,363,752.30
2 Pek.Lantai Granite 60 x 60 M2 69.70 387,188.78 26,987,057.91
Sub Total B.III 29,350,810.21
VII. PEKERJAAN PLAFOND
1 Pek. Rangka plafond kayu kelas II M2 25.68 - -
2 Pek.Plafon Tripleks 4 mm M2 25.68 - -
Sub Total B.III
VIII. PEKERJAAN KUSEN, PINTU, JENDELA
1 Pek. Kusen Kayu Kelas II M3 0.05 111,460.00 5,617.58
2 Pek. Pintu Panel Kelas II M2 - - -
3 Pek. Daun Jendela + kaca dan Rangka Aluminium M2 24.30 - -
Sub Total B.III 5,617.58
IX. PEKERJAAN INSTALASI DAN TITIK LAMPU
1 Pek. Pas. Instalasi Lampu Titik 5.00 220,000.00 1,100,000.00
2 Pek. Pas. Saklar Tunggal Bh 1.00 50,000.00 50,000.00
3 Pek. Pas. Saklar Ganda Bh 1.00 50,000.00 50,000.00
4 Pek. Pas. Stop Kontak Bh 1.00 50,000.00 50,000.00
5 Pek. Pas.Bola Lampu philips 18 Watt Set 5.00 125,000.00 625,000.00
6 pek. Pas. Fitting lampu Bh 5.00
6 Pek. Pas. MCB Set 1.00 80,000.00 80,000.00
Sub Total B.III 1,955,000.00
X. PEKERJAAN KUNCI & PENGGANTUNG
1 Pek. Pas. Kunci Pintu Hendel stainless Unit 1.00 -
2 Pek. Pas. Engsel Pintu Pasang 4.00
3 Pek. Pas Grendel Pintu BH 1.00
Sub Total B.III
XI PEKERJAAN PENGECATAN
1 Pek. Cat Dinding Luar anti lumut M2 - 26,785.94 -
2 Pek. Cat Lits Plank M2 - 73,013.95 -
Sub Total B.III -
TOTAL JUMLAH B. 119,438,052.57
C. PEKERJAAN FINISHING
1 Pek. Pembersihan Akhir Ls 1.00 300,000.00 300,000.00
Sub Jumlah C.I 300,000.00
TOTAL JUMLAH C. 300,000.00
C. PEKERJAAN PEMB. GASEBO TYPE B. (ATAP DATAR) = 3 UNIT
I. PEKERJAAN TANAH DAN PASIR
1 Galian Tanah Pondasi M3 4.21 85,804.38 361,236.42
2 Urugan Tanah Bekas Galian M3 1.05 28,596.59 30,097.91
4 Urugan Pasir Bawah Lantai M3 1.08 381,641.53 412,172.85
5 Urugan/Pemadatan Tanah Bawah Lantai M3 15.60 170,161.13 2,653,747.90
Sub Total II 3,457,255.09
II. PEKERJAAN PONDASI 1 : 5
1 Pek. Pas Batu Kosong M3 1.20 478,313.74 573,976.49
2 Pek. Pas. Batu Gunung Pondasi Bak Bunga1 : 3 M3 12.21 478,313.74 5,840,210.78
Sub Total III 6,414,187.26
III. PEKERJAAN BETON
1 Pek. Sloop Beton 15/20 Cm, 1 : 2 : 3 M3 0.30 5,559,788.94 1,667,936.68
2 Pek. Pondasi Plat Poour + Kolom Dia 30 Cm, 1 : 2 : 3 M3 2.37 5,014,351.92 11,884,014.06
3 Pek. Balok Atap 15/30 Cm, Camp. 1 : 2 : 3 M3 0.99 7,834,614.29 7,756,268.15
4 Pek. Plat Atap Beton Tebal 10 Cm, Camp. 1 : 2 : 3 M3 3.00 8,545,014.01 25,635,042.03
5 Pek. Aksesoris Besi Hollow M2 8.76 120,539.84 1,055,928.98
Sub Total III 47,999,189.90
IV. PEKERJAAN PASANGAN BATA, PLESTERAN & DINDING
1 Pek. Dinding Bak Bunga Pas. Bata 1 : 3 M2 72.99 120,232.09 8,775,740.38
2 Pek. Plesteran Dinding & Kolom 1 : 3 M2 145.98 77,013.96 11,242,498.24
3 Pek. List Profil Camp 1 : 2 M1 30.00 80,713.46 2,421,403.89
5 Pek. Pas Dinding Batu Alam M2 58.30 397,857.75 23,193,515.20
4 Pek. Acian Dinding & Kolom M2 72.99 25,469.05 1,858,985.96
Sub Total IV 47,492,143.67
V. PEKERJAAN SANITASI
1 Pek. Pipa Pembuangan Lantai PVC 2 Inci M1 9.60 8,572.50 82,296.00
Sub Total V 82,296.00
VI. PEKERJAAN LANTAI
1 Pek.Lantai Rabat Beton 1 : 3 : 5 M3 3.78 1,425,320.97 5,384,720.10
2 Pek.Lantai Tegel 40x40 (Anti Slip) M2 35.22 223,500.00 7,871,670.00
Sub Total VI 13,256,390.10
VII. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding, Kolom Luar anti lumut M2 60.99 26,785.94 1,633,674.36
Sub Jumlah VII 1,633,674.36
VIII. PEKERJAAN INSTALASI DAN TITIK LAMPU
1 Pek. Pas. Stop Kontak BH 4.00 50,000.00 200,000.00
Sub Total VIII 200,000.00
TOTAL JUMLAH 120,535,136.37
D. PEKERJAAN PEMBANGUNAN PAGAR PEMBATAS ALUN-ALUN
I. PEKERJAAN TANAH DAN PASIR
1 Galian Tanah Pondasi M3 47.74 85,804.38 4,096,300.86
2 Urugan Tanah Bekas Galian M3 11.94 28,596.59 341,300.30
3 Urugan Pasir Bawah Pondasi M3 4.62 381,641.53 1,763,183.87
Sub Total II 6,200,785.03
II. PEKERJAAN PONDASI 1 : 5
1 Pek. Pas. Batu Kosong Bawah Pondasi M3 18.48 478,313.74 8,839,237.93
2 Pek. Pas. Batu Gunung 1 : 4 M3 23.10 825,782.41 19,075,573.75
Sub Total II 27,914,811.68
III. PEKERJAAN BETON
1 Pek. Slop Beton 15/20 Cm, 1 : 2 : 3 M3 2.77 5,559,788.94 15,411,734.95
2 Pek. Kolom Beton 15/25 Cm, 1 : 2 : 3 M3 4.06 6,698,593.88 27,169,496.76
Sub Total III 42,581,231.71
IV. PEKERJAAN PASANGAN BATA, PLESTERAN & DINDING
1 Pek. Dinding Pas. Bata 1 : 4 M2 18.72 120,232.09 2,250,744.76
2 Pek. Plesteran Dinding & Kolom 1 : 4 M2 152.88 74,538.80 11,395,491.07
3 Pek. Plesteran Pondasi Camp. 1 : 4 M2 37.44 74,538.80 2,790,732.51
4 Pek. Acian Dinding & Kolom M2 190.32 25,469.05 4,847,269.60
5 Pek. Pas. Pagar Besi Polos Dia 12 mm M2 128.52 296,146.62 38,060,763.60
6 Pek. Pas. Pintu Pagar Besi Hollow Relling Bh 2.00 4,500,000.00 9,000,000.00
7 Pek. Pintu Pagar Besi Hollow Relling Utama Bh 1.00 12,240,000.00 12,240,000.00
Sub Total IV 80,585,001.53
V. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding & Kolom Luar anti lumut M2 190.32 26,785.94 5,097,899.72
Sub Jumlah V 5,097,899.72

TOTAL JUMLAH 162,379,729.68


E. PEKERJAAN PEMBANGUNAN JALAN PENDISTRIAN/SETAPAK
I. PEKERJAAN TANAH DAN PASIR
1 Galian Tanah Pondasi M3 33.44 85,804.38 2,869,298.30
2 Urugan Tanah Bekas Galian M3 8.36 28,596.59 239,067.49
3 Urugan Pasir Bawah Lantai M3 36.48 381,641.53 13,922,283.01
Sub Total I 17,030,648.81
II. PEKERJAAN PONDASI 1 : 5
1 Pek. Pas. Cansting Batu Gunung 1 : 4 M3 18.24 825,782.41 15,062,271.22
2 Pek. Pas. Dinding Saluran Air 1 : 4 M3 13.07 825,782.41 10,794,627.71
Sub Total II 15,062,271.22
III. PEKERJAAN PASANGAN BATA, PLESTERAN & DINDING
1 Pek. Plest. Cansting + Sal. Air, Camp. 1 : 3 M2 264.48 74,538.80 19,714,020.66
2 Pek. Acian Dinding & Kolom M2 264.48 25,469.05 6,736,054.34
Sub Total III 26,450,075.00
VIII. PEKERJAAN LANTAI
1 Pek.Lantai Beton Tumbuk, Camp. 1 : 3 : 5 M3 28.88 1,425,320.97 41,163,269.64
Sub Total VIII 41,163,269.64
TOTAL JUMLAH 99,706,264.68

F. PEKERJAAN PEMBANGUNAN POS JAGA


I. PEKERJAAN TANAH DAN PASIR
1 Galian Tanah Pondasi M3 4.42 74,538.80 329,461.48
2 Urugan Tanah Bekas Galian M3 1.11 25,469.05 28,143.30
3 Urugan Pasir Bawah Pondasi M3 0.35 296,146.62 103,651.32
4 Urugan Pasir Bawah Lantai M3 0.90 296,146.62 266,531.96
5 Urugan Tanah Alas Lantai M3 1.62 170,161.13 275,661.03
Sub Total I 461,256.09
II. PEKERJAAN PONDASI 1 : 5
1 Pek. Pas. Batu Kosong Bawah Pondasi M3 1.43 478,313.74 681,597.08
2 Pek. Pas. Batu Gunung 1 : 4 M3 5.25 825,782.41 4,335,357.67
Sub Total II 5,016,954.75
III. PEKERJAAN BETON
1 Pek. Slop Beton 15/20 Cm, 1 : 2 : 3 M3 0.44 5,559,788.94 2,446,307.13
2 Pek. Kolom Beton 15/15 Cm, 1 : 2 : 3 M1 25.50 136,133.26 3,471,398.25
3 Pek. Ring Balk Beton 14/28 Cm, 1 : 2 : 3 M3 0.76 7,834,614.29 5,954,306.86
3 Pek. Plat Dak Beton T. 10 Cm, 1 : 2 : 3 M3 2.03 8,545,014.01 17,303,653.37
Sub Total III 29,175,665.62
IV. PEKERJAAN PASANGAN BATA, PLESTERAN & DINDING
1 Pek. Dinding Pas. Bata 1 : 2 M2 6.57 1,524.00 10,012.68
2 Pek. Dinding Pas. Bata 1 : 5 M2 19.53 1,905.00 37,204.65
3 Pek. Plesteran Dinding & Kolom 1 : 2 M2 17.64 5,184.00 91,445.76
4 Pek. Plesteran Tembok Camp. 1 : 5 M2 39.06 5,184.00 202,487.04
5 Pek. Acian Dinding & Kolom M2 56.70 25,469.05 1,444,095.14
Sub Total IV 1,785,245.27
V. PEKERJAAN LANTAI
1 Pek. Pas. Lantai Tegel Ruangan,40x40 M2 7.12 325,915.34 2,320,517.23
2 Pas. Lantai Tegel 40x40 (Anti Sliip Km/wc) M2 1.20 325,915.34 391,098.41
4 Pek. Dinding Km/Wc 20 x 40 cm M2 6.24 378,004.21 2,358,746.26
5 Pek. Plin Lantai 10x60 M1 10.00 27,854.89 278,548.89
Sub Total V 5,348,910.80
VI. PEKERJAAN KUSEN, PINTU, JENDELA
1 Pek. Kusen Kayu Jati M3 0.14 691,706.00 93,380.31
2 Pek. Pintu Panel Jati M2 3.20 825,435.50 2,641,393.60
3 Pek. Daun Jendela/ventilasi + kaca M2 0.43 571,648.90 245,809.03
Sub Total VI 2,980,582.94
VII. PEKERJAAN KUNCI & PENGGANTUNG
1 Pek. Pas. Kunci Pintu Unit 2.00 441,531.00 883,062.00
2 Pek. Pas. Engsel Pintu Pasang 4.00 63,671.30 254,685.21
3 Pek. Pas. Engsel Jendela Pasang 2.00 46,276.00 92,552.00
4 Pek. Pas. Grendel Jendela Pasang 2.00 58,138.25 116,276.50
5 Pek. Pas. Hak Angin Pasang 4.00 35,397.86 141,591.45
Sub Total VII 1,488,167.16
VIII. PEKERJAAN SANITASI
1 Pek. Saluran Air Bersih PVC 1/2' M1 12.00 24,371.81 292,461.68
2 Pek. Saluran Air Kotor/ WC Pipa PVC 3' M1 6.00 90,096.69 540,580.16
3 Pek. Pas. Kloset Jongkok Porselin Unit 1.00 696,838.83 696,838.83
5 Pek. Pas. Kran Air BH 2.00 67,476.25 134,952.50
6 Pek. Pas. Floor Drain/ Roof Drain BH 1.00 43,067.50 43,067.50
7 Pek. Pas Bak Fiber Km/Wc BH 1.00 750,000.00 750,000.00
8 Pek. Septictank dan Rembesan BH 1.00 5,750,000.00 5,750,000.00
Sub Total VIII 8,207,900.66
IX. PEKERJAAN INSTALASI DAN TITIK LAMPU
2 Pek. Pas. Instalasi Lampu Titik 4.00 220,000.00 880,000.00
3 Pek. Pas. Saklar Tunggal Bh 1.00 50,000.00 50,000.00
4 Pek. Pas. Saklar Ganda Bh 2.00 50,000.00 100,000.00
5 Pek. Pas. Stop Kontak BH 6.00 50,000.00 300,000.00
6 Pek. Pas. Lampu TL 25 Watt Set 3.00 125,000.00 375,000.00
6 Pek. Pas. MCB Set 1.00 80,000.00 80,000.00
Sub Total IX. 1,785,000.00

X. PEKERJAAN LANTAI RUANGAN


1 Pek. Pasangan Lantai Tegel 40 x 40 cm M2 6.57 56,769.00 372,972.33
Sub Jumlah X 372,972.33
XI. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding & Kolom Luar anti lumut M2 56.70 25,350.00 1,437,345.00
2 Pek. Cat kusen, pintu dan jendela M2 9.48 73,013.95 692,172.23
Sub Jumlah XI 2,129,517.23

XII. PEK.SAL. & RABAT LT. KELILING BANGUNAN


1 Pek. Galian tanah Pondasi M3 5.72 85,804.38 490,389.16
2 Pek. Pas.Bata 1 : 4 M2 15.01 120,232.09 1,804,683.70
3 Pek. Plesteran 1 : 4 M2 30.02 74,538.80 2,237,654.64
4 Pek. Acian Dinding Saluran M2 30.02 25,469.05 764,580.88
5 Pek. Urugan Pasir Bawah Lantai Rabat M3 1.90 381,641.53 725,118.91
6 Pek. Lantai Rabat Beton 1 : 3 : 5 M3 0.51 1,425,320.97 728,339.02
Sub Total XII 6,750,766.31

TOTAL JUMLAH 65,502,939.16


G. PEKERJAAN PEMBANGUNAN KM/WC
I. PEKERJAAN TANAH DAN PASIR
1 Galian Tanah Pondasi M3 5.75 85,804.38 493,375.16
2 Urugan Tanah Bekas Galian M3 1.44 38,056.98 54,706.91
3 Urugan Pasir Bawah Pondasi M3 1.92 381,641.53 732,751.74
4 Urugan Pasir Bawah Lantai M3 1.22 381,641.53 465,602.67
5 Urugan Tanah Alas Lantai M3 2.08 170,161.13 353,935.15
Sub Total I 1,280,833.80
II. PEKERJAAN PONDASI 1 : 5
1 Pek. Pas. Batu Kosong Bawah Pondasi M3 1.92 478,313.74 918,362.38
2 Pek. Pas. Batu Gunung 1 : 4 M3 3.24 868,171.02 2,812,874.10
Sub Total II 3,731,236.48
III. PEKERJAAN BETON
1 Pek. Slop Beton 15/20 Cm, 1 : 2 : 3 M3 0.58 5,559,788.94 3,224,677.59
2 Pek. Kolom Beton 15/15 Cm, 1 : 2 : 3 M1 31.00 136,133.26 4,220,131.21
3 Pek. Ring Balk Beton 14/28 Cm, 1 : 2 : 3 M3 0.85 7,834,614.29 6,659,422.15
4 Pek. Plat Dak Beton T. 10 Cm, 1 : 2 : 3 M3 2.47 8,545,014.01 21,106,184.61
5 Pek. Lantai Rabat Beton T.7 cm, M3 0.85 1,425,320.97 1,211,522.83
Sub Total III 36,421,938.38
IV. PEKERJAAN PASANGAN BATA, PLESTERAN & DINDING
1 Pek. Dinding Pas. Bata 1 : 2 M2 8.71 135,001.81 1,175,865.76
2 Pek. Dinding Pas. Bata 1 : 5 M2 21.35 120,232.09 2,566,955.16
3 Pek. Plesteran Dinding & Kolom 1 : 2 M2 17.42 80,713.46 1,406,028.53
4 Pek. Plesteran Tembok Camp. 1 : 5 M2 42.70 73,066.06 3,119,920.84
5 Pek. Acian Dinding & Kolom M2 60.12 25,469.05 1,531,199.29
Sub Total IV 9,799,969.58
V. PEKERJAAN SANITASI
1 Pek. Saluran Air Bersih PVC 1/2' M1 12.00 24,371.81 292,461.68
2 Pek. Saluran Air Kotor/ WC Pipa PVC 3' M1 6.00 90,096.69 540,580.16
3 Pek. Pas. Kloset Jongkok Porselin Unit 1.00 696,838.83 696,838.83
5 Pek. Pas. Kran Air BH 2.00 67,476.25 134,952.50
6 Pek. Pas. Floor Drain/ Roof Drain BH 1.00 43,067.50 43,067.50
7 Pek. Septictank dan Rembesan BH 1.00 5,750,000.00 5,750,000.00
8 Pek. Pas.Tank Air + Dudukan 1000 ltr BH 1.00 6,500,000.00 6,500,000.00
Sub Total V 13,957,900.66
VI. PEKERJAAN KUSEN, PINTU, JENDELA
1 Pek. Kusen Kayu Jati M3 0.07 7,756,278.50 542,939.50
2 Pek. Pintu Panel Jati M2 1.40 750,225.50 1,050,315.70
Sub Total VI 1,593,255.20
VII. PEKERJAAN KUNCI & PENGGANTUNG
1 Pek. Pas. Kunci Pintu Unit 2.00 58,138.25 116,276.50
2 Pek. Pas. Engsel Pintu Pasang 4.00 63,671.30 254,685.21
Sub Total VII 370,961.71
VIII PEKERJAAN LANTAI
1 Pek. Pas. Lantai Tegel Ruangan,40x40 M2 6.12 325,915.34 1,994,601.89
2 Pas. Lantai Tegel 40x40 (Anti Sliip Km/wc) M2 5.10 325,915.34 1,662,168.24
3 Pek. Dinding Km/Wc 20 x 40 cm M2 13.00 378,004.21 4,914,054.71
4 Pek. Plin Lantai 10x60 M1 7.50 27,854.89 208,911.67
Sub Total VIII 8,779,736.51
IX. PEKERJAAN INSTALASI DAN TITIK LAMPU
1 Pek. Pas. Instalasi Lampu Titik 5.00 157,930.00 789,650.00
2 Pek. Pas. Saklar Tunggal Bh 2.00 14,034.00 28,068.00
3 Pek. Pas. Saklar Ganda Bh 1.00 44,974.00 44,974.00
4 Pek. Pas. Stop Kontak BH 1.00 27,404.00 27,404.00
5 Pek. Pas. Lampu TL 25 Watt Set 4.00 50,000.00 200,000.00
6 Pek. Pas. MCB Set 1.00 85,000.00 85,000.00
Sub Total IX 1,175,096.00
X. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding & Kolom Luar anti lumut M2 60.12 36,583.94 2,199,426.35
2 Pek. Cat kusen, pintu dan jendela M2 5.32 73,013.95 388,434.21
Sub Jumlah X 2,587,860.56
XI. PEK.SAL. & RABAT LT. KELILING BANGUNAN
1 Pek. Galian tanah Pondasi M3 5.72 85,804.38 490,389.16
2 Pek. Pas.Bata 1 : 4 M2 15.01 120,232.09 1,804,683.70
3 Pek. Plesteran 1 : 4 M2 30.02 74,538.80 2,237,654.64
4 Pek. Acian Dinding Saluran M2 30.02 25,469.05 764,580.88
5 Pek. Urugan Pasir Bawah Lantai Rabat M3 1.90 381,641.53 725,118.91
6 Pek. Lantai Rabat Beton 1 : 3 : 5 M3 0.51 1,425,320.97 728,339.02
Sub Total XI 6,750,766.31

TOTAL JUMLAH 86,449,555.18


H. PEKERJAAN PEMBANGUNAN AREL PERMAINAN TAMAN
I. PEKERJAAN TANAH DAN PASIR
1 Pek. Timb. Peninggi Lantai + pemadatan M3 157.63 170,161.13 26,821,648.12
2 Pek. Urugan Pasir Bawah Lantai M3 26.48 381,641.53 10,105,867.71
3 Pek. Susunan Batu Gunung 5/7 Landasan Lantai M3 26.48 478,313.74 12,665,747.86
Sub Total I 49,593,263.69
II. PEKERJAAN PONDASI 1 : 5
2 Pek. Pas. Cansting Batu Gunung 1 : 4 M3 5.53 868,171.02 4,800,117.56
Sub Total II 4,800,117.56
III. PEKERJAAN BETON
1 Pek. Kursi Beton 4 Unit M3 0.76 8,545,014.01 6,521,554.69
2 Pek. Lantai Rabat Beton T.7 cm, M3 19.86 1,425,320.97 28,306,874.48
Sub Total III 34,828,429.18
IV. PEKERJAAN PASANGAN BATA, PLESTERAN & DINDING
1 Pek. Plesteran Dinding & Kolom 1 : 4 M2 73.72 73,066.06 5,386,430.08
2 Pek. Acian Dinding & Kolom M2 73.72 25,469.05 1,877,578.37
Sub Total IV 7,264,008.45
V. PEKERJAAN INSTALASI DAN TITIK LAMPU TAMAN
1 Pek. Pas. Instalasi Lampu Titik 25.00 157,930.00 3,948,250.00
2 Pas. Lampu + Tiang Pipa Gip 2 " TL 25 Watt Set 11.00 1,450,000.00 15,950,000.00
3 Pek. Pas. MCB Set 11.00 85,000.00 935,000.00
4 Pek. Pas. Kabel Listrik Tanam Roll 3.00 2,400,000.00 7,200,000.00
5 Pek. Pas. Panel Lampu Set 1.00 4,000,000.00 4,000,000.00
Sub Total V. 32,033,250.00
VI. PEKERJAAN PEMBUATAN SARANA BERMAIN
1 Pek. Pembuatan Permainan Panjatan Bola Unit 2.00 6,250,000.00 12,500,000.00
2 Pek. Pembuatan Permainan Jungkitan Unit 2.00 2,500,000.00 5,000,000.00
3 Pek. Pembuatan Permainan Seluncuran Unit 2.00 17,500,000.00 35,000,000.00
4 Pek. Pembuatan Permainan Ayunan Kursi Unit 2.00 6,250,000.00 12,500,000.00
5 Pek. Pembuatan Permainan Kursi Putar Unit 1.00 5,937,500.00 5,937,500.00
Sub Jumlah VI 70,937,500.00
VII. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding & Kolom Luar anti lumut M2 73.72 36,583.94 2,696,967.91
Sub Jumlah VII 2,696,967.91

TOTAL JUMLAH 202,153,536.78


I. PEKERJAAN FINISHING
1 Pek. Pembersihan Akhir Ls 1.00 1,380,000.00 1,380,000.00
Sub Jumlah XIV 1,380,000.00
REKAPITULASI
ENGINER ESTIMATE (E.E.)

INSTANSI : DINAS PARIWISATA KABUPATEN BUTON TENGAH.


PEKERJAAN : PEMBUATAN RUANG GANTI DAN/ATAU TOILET PANTAI MUTIARA.
TAHUN ANGGARAN : 2018
LOKASI : KEC. MAWASANGKA, KAB. BUTON TENGAH

NO MATA PEMBAYARAN HARGA (Rp)

1 2 3

A PEKERJAAN PENDAHULUAN 6,000,000.00


B PEKERJAAN TANAH DAN PONDASI 15,696,418.59
C PEKERJAAN BETON 35,901,884.91
D PEKERJAAN DINDING 24,869,233.61
E PEKERJAAN RANGKA ATAP DAN ATAP 3,905,852.91
F PEKERJAAN PLAFOND 3,333,512.87
G PEKERJAAN LANTAI 6,861,236.66
H PEKERJAAN ELEKTRIKAL 2,590,900.00
I PEKERJAAN KUSEN DAN PINTU ALUMINIUM 1,800,000.00
J PEKERJAAN SANITASI 22,924,284.35
K PEKERJAAN PENGECETAN 2,289,757.65
L PEKERJAAN AKHIR 1,000,000.00

REAL COST ( A +B +C ) 127,173,081.56


PPN 10 % 12,717,308.16
TOTAL 139,890,389.72
DIBULATKAN 139,800,000.00
TERBILANG : SERATUS TIGA PULUH JUTA RUPIAH.

Labungkari, 21 Pebruari 2018


Mengetahui/Menyetujui : Dibuat Oleh :
Pejabat Pembuat Komitmen (PPK) Konsultan Perencana
Dinas Pariwisata Kab. Buton Tengah CV. TIOFAN ADIKARYA KONSULTAN

SAFRIN, S.ST.Par RACHMAWATI, D.M., S.Pd


NIP. 19750713 200502 1 004 Direktur
ENGINER ESTIMATE (E.E.)
KEGIATAN : DINAS PARIWISATA KABUPATEN BUTON TENGAH.
PEKERJAAN : PEMBUATAN RUANG GANTI DAN/ATAU TOILET PANTAI MUTIARA.
TAHUN ANGGARAN : 2018
LOKASI : KEC. MAWASANGKA, KAB. BUTON TENGAH

HARGA JUMLAH KETER


No. URAIAN PEKERJAAN SATUAN VOLUME
SATUAN (Rp) HARGA (RP) ANGAN

A. PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi Ls 1.00 1,000,000.00 1,000,000.00
2 Administrasi, Pelaporan dan Dokumentasi Ls 1.00 1,500,000.00 1,500,000.00
3 Pengukuran, Pas. Bouplank dan Barak Kerja Ls 1.00 4,000,000.00 3,500,000.00

Sub Total A 6,000,000.00


B. PEKERJAAN TANAH DAN PONDASI
1 Galian Tanah M3 6.80 106,462.40 723,944.32
2 Pas. Pondasi Batu Gunung 1:5 M3 10.75 1,118,544.63 12,024,354.72
3 Urugan Tanah M3 10.86 177,088.50 1,923,181.11
4 Plesteran 1:5 M2 13.30 77,063.04 1,024,938.45

Sub Total B 15,696,418.59


C. PEKERJAAN BETON
1 Pek. Balok Beton Bertulang M3 0.09 6,198,290.13 557,846.11
2 Pek. Plat Beton Bertulang M3 1.71 7,067,757.98 12,085,866.14
3 Pek. Talang Beton M3 1.22 7,067,757.98 8,622,664.73
4 Pek. Rabat Beton M3 0.32 1,248,054.75 399,377.52
5 Pek. Pasta Beton Profil M3 0.05 1,248,054.75 62,402.74
6 Pek. Sloof Beton Bertulang M3 0.68 6,198,290.13 4,214,837.29
7 Pek. Kolom Beton Bertulang M3 0.92 6,364,496.36 5,855,336.65
8 Pek. Ring Balk Beton Bertulanag M3 0.51 6,198,290.13 3,161,127.96
9 Pek. Plesteran 1:3 M2 11.58 81,360.50 942,425.78

Sub Total C. 35,901,884.91


D. PEKERJAAN DINDING
1 Pek. Pas Dinding Batu Bata 1:5 M2 46.43 180,264.57 8,369,683.99
2 Pek. Plesteran 1:5 M2 92.86 77,063.04 7,156,073.99
3 Pas. Dinding Keramik M2 20.20 278,521.38 5,626,131.78
4 Pek. Acian M2 75.13 26,027.38 1,955,436.68
5 Pek. Pas. Dinding Batu Alam M2 4.64 379,721.38 1,761,907.18

Sub Total D 24,869,233.61


E. PEKERJAAN RANGKA ATAP DAN ATAP
1 Pek. Rangka Atap Baja Ringan M2 8.45 229,000.00 1,935,050.00
2 Pek. Pas Atap Metal Soka M2 8.45 152,847.18 1,291,558.63
3 Pek. Pas Nok Metal Soka M' 2.00 128,658.09 257,316.18
4 Pas. List Plank Kayu Papan M' 4.40 95,892.75 421,928.10

Sub Total E. 3,905,852.91

34/98
HARGA JUMLAH KETER
No. URAIAN PEKERJAAN SATUAN VOLUME
SATUAN (Rp) HARGA (RP) ANGAN

F. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Baja Ringan M2 8.00 229,000.00 1,832,000.00
2 Pek. Plafond Tripleks 3 mm M2 14.03 59,226.01 830,940.87
3 Pas. List Profil 4/6 M' 21.00 31,932.00 670,572.00

Sub Total F. 3,333,512.87


G. PEKERJAAN LANTAI
1 Pas. Pasir Bawah Lantai T 5 cm M3 1.65 349,404.50 576,517.43
2 Lantai Floor T 5 cm M3 1.65 1,248,054.75 2,059,290.34
3 Pas. Lantai Keramik Anti Slip Warna 40 x 40 cm M2 14.00 301,816.35 4,225,428.90

Sub Total G. 6,861,236.66


H. PEKERJAAN ELEKTRIKAL
1 Pas. Instalasi Listrik Titik 10.00 219,000.00 2,190,000.00
2 Pas. Saklar Tunggal bh 4.00 25,000.00 100,000.00
3 Pas. Saklar Ganda bh 1.00 27,000.00 27,000.00
4 Pas. Stop Kontak bh 1.00 43,900.00 43,900.00
5 Pas. MCB 2 Ampere Bh 1.00 150,000.00 150,000.00
6 Pas. Pitting Lampu Bh 4.00 20,000.00 80,000.00

Sub Total H. 2,590,900.00

I. PEKERJAAN KUSEN DAN PINTU ALUMINIUM


1 Pas. Pintu KM/WC Alumenium/Set Bh 4.00 450,000.00 1,800,000.00

Sub Total I. 1,800,000.00


J. PEKERJAAN SANITASI
1 Pas. Bakmandi Viber Bh 4.00 545,171.88 2,180,687.50
2 Pas. Pipa PVC 1/2 inch M' 28.00 27,489.46 769,704.78
3 Pas. Pipa PVC 3 Inch M' 8.00 97,086.68 776,693.44
4 Pas. Profil Tank 1200 Bh 2.00 1,550,000.00 3,100,000.00
5 Pas. Wastafel / set Bh 1.00 1,411,499.65 1,411,499.65
6 Pas. Urinoir Bh 1.00 2,166,611.50 2,166,611.50
7 Pas. Kloset Jongkok Bh 2.00 530,857.25 1,061,714.50
8 Pas. Pipa Hawa Gip 1/5" Set 1.00 250,000.00 250,000.00
9 Pas. Kran Air 1/2" Bh 4.00 84,410.00 337,640.00
10 Pas. Floor Drain Bh 4.00 133,963.50 535,854.00
11 Pekerjaan Septi tank Ls 1.00 6,800,000.00 6,800,000.00
12 Tutupan Septi Tank M3 0.50 7,067,757.98 3,533,878.99

Sub Total J. 22,924,284.35


K. PEKERJAAN PENGECETAN
1 Pengecetan Plafond M2 14.20 52,296.66 742,612.63
2 Pek. Pengecetan dinding M2 71.00 21,790.78 1,547,145.03
Sub Total K. 2,289,757.65
L. PEKERJAAN AKHIR
1 Pembersihan Akhir/Perapihan Ls 1.00 1,000,000.00 1,000,000.00
Sub Jumlah L. 1,000,000.00
REAL COST 127,173,081.56

35/98
REKAPITULASI
ENGINER ESTIMATE (E.E.)

INSTANSI : DINAS PARIWISATA KABUPATEN BUTON TENGAH.


PEKERJAAN : PEMBUATAN PERGOLA PANTAI MUTIARA DAN PANTAI MAOBU.
TAHUN ANGGARAN : 2018
LOKASI : KABUPATEN BUTON TENGAH

NO MATA PEMBAYARAN HARGA (Rp)

1 2 3

A PEKERJAAN PERSIAPAN 4,000,000.00


B PEKERJAAN PERGOLA (5 UNIT) 70,499,074.92
C PEKERJAAN AKHIR 500,000.00

REAL COST ( A +B +C ) 74,999,074.92


PPN 10 % 7,499,907.49
TOTAL 82,498,982.41
DIBULATKAN 82,400,000.00
TERBILANG : TUJUH PULUH LIMA JUTA RUPIAH.

Labungkari, 21 Pebruari 2018


Mengetahui/Menyetujui : Dibuat Oleh :
Pejabat Pembuat Komitmen (PPK) Konsultan Perencana
Dinas Pariwisata Kab. Buton Tengah CV. TIOFAN ADIKARYA KONSULTAN

SAFRIN, S.ST.Par RACHMAWATI, D.M., S.Pd


NIP. 19750713 200502 1 004 Direktur
ENGINER ESTIMATE (E.E.)
KEGIATAN : DINAS PARIWISATA KABUPATEN BUTON TENGAH.
PEKERJAAN : PEMBUATAN PERGOLA PANTAI MUTIARA DAN PANTAI MAOBU.
TAHUN ANGGARAN : 2018
LOKASI : KABUPATEN BUTON TENGAH

HARGA JUMLAH
No. URAIAN PEKERJAAN SATUAN VOLUME KETERANGAN
SATUAN (Rp) HARGA (RP)

A. PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi Ls 1.00 500,000.00 500,000.00
2 Administrasi, Pelaporan dan Dokumentasi Ls 1.00 1,000,000.00 1,000,000.00
3 Pengukuran, Pas. Bouplank dan Barak Kerja Ls 1.00 2,500,000.00 2,500,000.00

Sub Total A 4,000,000.00


B. PEKERJAAN PERGOLA (5 UNIT)
1 Galian Tanah M3 0.90 106,462.40 95,816.16
2 Urugan Tanah M3 1.65 177,088.50 292,196.03
3 Urugan Pasir M3 0.31 349,404.50 109,188.91
4 Pas. Pondasi Batu Gunung 1:5 M3 2.11 1,118,544.63 2,357,332.80
5 Pas. Tempat Duduk Batu Gunung 1:5 M3 0.38 1,118,544.63 429,521.14
6 Rabat Beton Dibawah Lantai M3 0.31 1,248,054.75 390,017.11
7 Pas. Lantai Keramik 40x40 cm (motif batu alam) M2 6.25 301,816.35 1,886,352.19
8 Pas. Dinding Batu Tempel (Koral) M2 8.00 372,763.88 2,982,111.00
9 Pas. Tiang Kayu Balok 15x15 cm M3 0.21 7,693,787.50 1,648,009.28
10 Pas. Balok Gording 6x12 cm M3 0.06 6,702,027.50 371,560.40
11 Pas. Balok Bengkirai 5x10 cm M3 0.13 6,702,027.50 903,098.21
12 Pas. Atap Fiberglass Transparan M2 14.82 108,726.75 1,611,602.25
13 Plesteran 1:5 M2 2.00 77,063.04 154,126.08
14 Acian M2 2.00 26,027.38 52,054.75
15 Pengecattan Anti Lumut M2 2.00 52,444.03 104,888.05
16 Pengecatan Bidang Kayu M2 13.61 52,296.66 711,940.64

Sub Total B. (untuk 1 unit) 14,099,814.98


Sub Total B. (untuk 5 unit) 70,499,074.92
C. PEKERJAAN AKHIR
1 Pembersihan Akhir/Perapihan Ls 1.00 500,000.00 500,000.00
Sub Jumlah C. 500,000.00
REAL COST 74,999,074.92
REKAPITULASI
ENGINER ESTIMATE (E.E.)

INSTANSI : DINAS PARIWISATA KABUPATEN BUTON TENGAH.


PEKERJAAN : PEMBANGUNAN GAZEBO PANTAI MAOBU.
TAHUN ANGGARAN : 2018
LOKASI : KABUPATEN BUTON TENGAH

NO MATA PEMBAYARAN HARGA (Rp)

1 2 3

A PEKERJAAN PENDAHULUAN 1,400,000.00


B PEKERJAAN GAZEBO 37,828,765.16
C PEKERJAAN FINISHING 300,000.00

REAL COST ( A +B +C ) 39,528,765.16


PPN 10 % 3,952,876.52
TOTAL 43,481,641.67
DIBULATKAN 43,400,000.00
TERBILANG : EMPAT PULUH JUTA RUPIAH.

Labungkari, 21 Pebruari 2018


Mengetahui/Menyetujui : Dibuat Oleh :
Pejabat Pembuat Komitmen (PPK) Konsultan Perencana
Dinas Pariwisata Kab. Buton Tengah CV. TIOFAN ADIKARYA KONSULTAN

SAFRIN, S.ST.Par RACHMAWATI, D.M., S.Pd


NIP. 19750713 200502 1 004 Direktur
ENGINER ESTIMATE (E.E.)
KEGIATAN : DINAS PARIWISATA KABUPATEN BUTON TENGAH.
PEKERJAAN : PEMBANGUNAN GAZEBO PANTAI MAOBU.
TAHUN ANGGARAN : 2018
LOKASI : KABUPATEN BUTON TENGAH

HARGA JUMLAH KETERA


No. URAIAN PEKERJAAN SATUAN VOLUME
SATUAN (Rp) HARGA (RP) NGAN

A. PEKERJAAN PENDAHULUAN
1 Pembersihan Lokasi Ls 1.00 300,000.00 300,000.00
2 Administrasi, Pelaporan dan Dokumentasi Ls 1.00 400,000.00 400,000.00
3 Pengukuran, Pas. Bouplank dan Barak Kerja Ls 1.00 700,000.00 700,000.00
JUMLAH 1,400,000.00
B. PEKERJAAN GAZEBO
I. PEKERJAAN PONDASI
1 Galian Tanah M3 1.48 106,462.40 157,564.35
2 Pas. Batu Gunung 1:5 M3 4.03 1,118,544.63 4,507,734.84

Sub Jumlah B.I 4,665,299.19


II. PEKERJAAN BETON 1:2:3
1 Pek. Kolom Profil 10/20 cm M3 0.25 6,364,496.36 1,591,124.09
2 Pek Kolom Profil 30/50 cm M3 0.96 6,364,496.36 6,109,916.50
3 Pek. Kolom 15/15 cm M3 0.09 6,748,974.16 607,407.67
4 Pek. Balok 15/15 cm M3 0.45 10,293,867.93 4,632,240.57

Sub Jumlah B.II 12,940,688.83


III. PEKERJAAN DINDING
1 Pek. Pas Batu Bata 1 : 5 M2 11.43 180,264.57 2,060,424.04
2 Pek. Dinding Batu Alam Candi' M2 4.76 379,721.38 1,807,473.75
3 Pek. Dinding Batu Tempel (Koral) M2 6.40 372,763.88 2,385,688.80
4 Pek. Plesteran 1 : 5 M2 14.25 77,063.04 1,098,148.33
5 Pek. Acian Semen M2 14.25 26,027.38 370,890.09

Sub Jumlah B.III 7,722,625.01


IV. PEKERJAAN RANGKA ATAP DAN ATAP
1 Pek. Rangka Atap Baja Ringan M2 20.86 229,000.00 4,776,940.00
2 Pek. Pas Atap Metal Soka M2 20.86 152,847.18 3,188,392.07
3 Pas. Nok Atap Metal Soka M' 10.17 128,658.09 1,308,452.78
4 Pas. List Plank M' 20.00 95,892.75 1,917,855.00

Sub Jumlah B.IV 11,191,639.85


V. PEKERJAAN LANTAI
1 Urugan Tanah Dipadatkan M3 2.83 177,088.50 500,907.47
2 Pek. Lantai Rabat Beton 1:3:5 M3 0.42 1,248,054.75 524,183.00

Sub Jumlah B.V 1,025,090.47

39/98
HARGA JUMLAH KETERA
No. URAIAN PEKERJAAN SATUAN VOLUME
SATUAN (Rp) HARGA (RP) NGAN

VI. PEKERJAAN PENGECETAN


1 Pengecetan M2 14.25 19,889.25 283,421.81

Sub Jumlah B.VI 283,421.81


JUMLAH B. 37,828,765.16
C. PEKERJAAN FINISHING
1 Pek. Pembersihan Akhir Ls 1.00 300,000.00 300,000.00
JUMLAH C. 300,000.00
REAL COST 39,528,765.16

40/98
REKAPITULASI
ENGINER ESTIMATE (E.E.)

INSTANSI : DINAS PARIWISATA KABUPATEN BUTON TENGAH.


PEKERJAAN : PEMBUATAN POS JAGA PANTAI MUTIARA DAN PANTAI MAOBU.
TAHUN ANGGARAN : KABUPATEN BUTON TENGAH
LOKASI : 2018

NO MATA PEMBAYARAN HARGA (Rp)

1 2 3

A PEK. PENDAHULUAN 6,300,000.00


B PEKERJAAN POS JAGA (3 UNIT) 169,478,143.55
C PEK. AKHIR/FINISHING 1,000,000.00

REAL COST ( A +B +C ) 176,778,143.55


PPN 10 % 17,677,814.36
TOTAL 194,455,957.91
DIBULATKAN 194,400,000.00
TERBILANG : SERATUS DELAPAN PULUH JUTA RUPIAH.

Labungkari, 21 Pebruari 2018


Mengetahui/Menyetujui : Dibuat Oleh :
Pejabat Pembuat Komitmen (PPK) Konsultan Perencana
Dinas Pariwisata Kab. Buton Tengah CV. TIOFAN ADIKARYA KONSULTAN

SAFRIN, S.ST.Par RACHMAWATI, D.M., S.Pd


NIP. 19750713 200502 1 004 Direktur
ENGINER ESTIMATE (E.E.)
INSTANSI : DINAS PARIWISATA KABUPATEN BUTON TENGAH.
PEKERJAAN : PEMBUATAN POS JAGA PANTAI MUTIARA DAN PANTAI MAOBU.
LOKASI : KABUPATEN BUTON TENGAH
TH. ANGGARAN : 2018

HARGA JUMLAH
NO. URAIAN DAN JENIS PEKERJAAN SATUAN VOLUME SATUAN HARGA
(Rp) (Rp)

I. PEK. PENDAHULUAN
1. Pembersihan awal Lokasi Ls 1.00 1,000,000.00 1,000,000.00
2. Pengukuran / Pas. Bouwplank Ls 1.00 1,500,000.00 1,500,000.00
3. Pembuatan Gudang/Barak Kerja Ls 1.00 2,000,000.00 2,000,000.00
4. Administrasi (Dokumentasi, P3K, As Built Drawing) Ls 1.00 1,800,000.00 1,800,000.00

JUMLAH PEK. PENDAHULUAN 6,300,000.00


II. PEKERJAAN POS JAGA (3 UNIT)
Pek. Tanah dan Pasir
1. Pek. Galian Pondasi M3 3.00 106,462.400 319,387.20
2. Pek. Urugan tanah alas lantai M3 3.25 177,088.500 575,360.54
3. Pek. Urugan pasir alas lantai M3 0.57 349,404.500 198,662.66
4. Pek. Urugan pasir alas Pondasi M2 0.52 349,404.500 181,690.34

Pek. Batu dan Pasangan


1. Pas. Pondasi Batu gunung 1 : 5 M3 2.88 1,118,544.625 3,221,408.52
2. Pas. Batu Kosong M3 1.56 645,469.125 1,006,931.84
3. Pas. Dinding Trasram 1 : 3 M2 8.58 188,175.880 1,614,078.61
4. Pas. Dinding bata 1 : 5 M2 12.61 180,264.570 2,273,136.23

Pek. Beton
1. Pek. Rabat Lantai 1 : 3 : 5 M3 0.57 1,248,054.750 709,612.73
2. Pek. Beton Kolom 20/20 Cm M3 0.45 6,364,496.356 2,851,294.37
3. Pek. Beton Kolom Praktis 11/11 Cm M' 16.20 148,176.350 2,400,456.87
4. Pek. Beton Sloof 20/30 Cm M3 0.78 6,198,290.125 4,834,666.30
5. Pek. Beton Balok Latai 10/15 Cm M' 9.00 116,366.200 1,047,295.80
6. Pek. Beton Balok Plat Atap 15/20 Cm M3 0.36 10,293,867.925 3,705,792.45
7. Pek. Beton Plat Atap T. 10 Cm M3 1.63 7,067,757.975 11,534,581.02

Pek. Plasteran
1. Pek. Plesteran, 1 : 5 M2 24.14 77,063.041 1,860,109.15
2. Pek. Plesteran 1 : 3 M2 23.66 81,360.499 1,924,989.41
3. Pek. Acian M2 47.80 26,027.375 1,244,043.46

Pek. Kusen dan Kaca


1. Pek. Kusen Pintu & Jendela Aluminium Coating 4/8 M' 32.20 97,445.423 3,137,742.60
2. Pek. Daun Pintu & Jendela Aluminium M2 5.60 497,835.000 2,787,876.00
3. Pas. Kaca Bening 5 mm M2 3.12 254,862.713 795,171.66

42/98
HARGA JUMLAH
NO. URAIAN DAN JENIS PEKERJAAN SATUAN VOLUME SATUAN HARGA
(Rp) (Rp)

Pek. Lantai
1. Pas. Lantai Granit 60 x 60 cm M2 8.12 285,789.950 2,321,328.87
2. Rabat Keliling Bangunan M3 1.60 1,248,054.750 1,996,887.60

Pek. Cat dan Finishing


1. Pek. Pengecatan M2 47.80 21,790.775 1,041,544.57
2. Pas. Dinding Batu Alam M2 7.66 379,721.375 2,908,665.73

JUMLAH PER UNIT 56,492,714.52


JUMLAH PEKERJAAN POS JAGA (3 UNIT) 169,478,143.55
III. PEK. AKHIR/FINISHING
1. Pek. Perapihan/Pembersihan Ls 1.000 1,000,000.000 1,000,000.00

TOTAL PEK. AKHIR/FINISHING 1,000,000.00


REAL COAST 176,778,143.55

43/98
REKAPITULASI
DAFTAR KUANTITAS DAN HARGA

INSTANSI : DINAS PARIWISATA KABUPATEN BUTON TENGAH.


PEKERJAAN : PEMBANGUNAN LANDMARK PANTAI MUTIARA.
LOKASI : KABUPATEN BUTON TENGAH
TAHUN ANGGARAN : 2018

NO MATA PEMBAYARAN HARGA (Rp)

1 2 3

A PEK. PENDAHULUAN 15,050,000.00


B PEK. LANDMARK 845,409,771.91
C PEK. AKHIR 1,000,000.00

REAL COST ( A +B +C ) 861,459,771.91


PPN 10 % 86,145,977.19
TOTAL 947,605,749.10
DIBULATKAN 947,600,000.00
TERBILANG : SEMBILAN RATUS JUTA RUPIAH.

Labungkari, 21 Pebruari 2018


Mengetahui/Menyetujui : Dibuat Oleh :
Pejabat Pembuat Komitmen (PPK) Konsultan Perencana
Dinas Pariwisata Kab. Buton Tengah CV. TIOFAN ADIKARYA KONSULTAN

SAFRIN, S.ST.Par RACHMAWATI, D.M., S.Pd


NIP. 19750713 200502 1 004 Direktur
ENGINER ESTIMATE (E.E.)
INSTANSI : DINAS PARIWISATA KABUPATEN BUTON TENGAH.
PEKERJAAN : PEMBANGUNAN LANDMARK PANTAI MUTIARA.
LOKASI : KABUPATEN BUTON TENGAH
TAHUN ANGGARAN : 2018

HARGA JUMLAH
NO. URAIAN DAN JENIS PEKERJAAN SATUAN VOLUME SATUAN HARGA
(Rp) (Rp)

I. PEK. PENDAHULUAN
1. Pembersihan awal Lokasi Ls 1.00 2,000,000.00 2,000,000.00
2. Pengukuran / Pas. Bouwplank Ls 1.00 2,050,000.00 2,050,000.00
3. Pembuatan Gudang/Barak Kerja Ls 1.00 7,500,000.00 7,500,000.00
4. Administrasi (Dokumentasi, P3K, As Built Drawing) Ls 1.00 3,500,000.00 3,500,000.00

JUMLAH PEK. PENDAHULUAN 15,050,000.00

II PEK. LANDMARK
a PEKERJAAN LETTER BLOCK
1. Galian Tanah M3 39.200 80,011.250 3,136,441.00
2. Urugan Tanah M3 65.226 177,088.500 11,550,774.50
3. Pas. Batu Kosong M3 10.008 645,469.125 6,459,855.00
4. Pek. Pas. Batu Gunung 1 : 4 M3 66.726 1,165,602.625 77,776,000.76
5. Pek. Lantai Kerja M3 0.448 1,227,389.858 549,870.66
6. Pondasi Poerplat Beton Bertulang 1:2:3 M3 1.792 7,678,888.100 13,760,567.48
7. Kolom Beton Bertulang 20x20 cm Camp. 1:2:3 M3 1.456 6,364,496.356 9,266,706.69
8. Balok Beton Bertulang Bertulang 20x25 cm Camp. 1:2:3 M3 1.189 10,293,867.925 12,239,408.96
9. Balok Beton Bertulang Bertulang 15x15 cm Camp. 1:2:3 M' 81.200 116,366.200 9,448,935.44
10. Pas. Rangka Alcopan M2 168.110 239,609.975 40,280,832.90
11. Pas. Dinding Alcopan M2 168.110 917,481.500 154,237,814.97
12. Pas. Pipa GIP dia. 3,0" M' 36.400 103,487.925 3,766,960.47
13. Pas. Sejenis Granit 60x60 cm M2 34.090 285,789.950 9,742,579.40
14. Pas. Dinding Batu Alam Candi M2 11.360 379,721.375 4,313,634.82
15. Pas. Dinding Batu Alam Palimanan M2 16.440 379,721.375 6,242,619.41
16. Plesteran 1:3 M2 70.420 81,360.499 5,729,406.34
17. Acian M2 70.420 26,027.375 1,832,847.75
18. Pengecatan M2 70.420 52,444.025 3,693,108.24

Sub Jumlah PEKERJAAN LETTER BLOCK 374,028,364.77


HARGA JUMLAH
NO. URAIAN DAN JENIS PEKERJAAN SATUAN VOLUME SATUAN HARGA
(Rp) (Rp)

b PENATAAN LANTAI HALAMAN


1. Galian Tanah M3 1.363 80,011.250 109,039.33
2. Urugan Tanah M3 213.776 177,088.500 37,857,342.01
3. Urugan Pasir Alas M3 24.572 349,404.500 8,585,567.37
4. Pas. Batu Kosong M3 2.486 645,469.125 1,604,636.24
5. Pas. Batu Gunung 1:4 M3 6.961 1,165,602.625 8,113,526.75
6. Pek. Rabat Beton 1 : 3 :5 dibawah lantai M3 18.688 1,248,054.750 23,323,647.17
7. Pas. Lantai Sejenis Granit 60x60 cm M2 103.040 285,789.950 29,447,796.45
8. Pas. Lantai Batu Alam Candi M2 270.720 379,721.375 102,798,170.64

Sub Jumlah PENATAAN LANTAI HALAMAN 211,839,725.97


c PEK. BAK TANAMAN
1. Galian Tanah M3 19.584 80,011.250 1,566,940.32
2. Urugan Tanah M3 29.453 177,088.500 5,215,752.17
3. Urugan Pasir Alas M3 1.768 349,404.500 617,747.16
4. Pas. Batu Kosong M3 5.760 645,469.125 3,717,902.16
5. Pas. Batu Gunung 1:4 M3 33.574 1,165,602.625 39,133,709.41
6. Pek. Kansteen Rabat Beton 1:3:5 M3 3.226 1,248,054.750 4,025,925.09
7. Pek. Rabat Beton dibawah lantai M3 1.768 1,248,054.750 2,206,560.80
8. Pas. Lantai Sejenis Granit 60x60 cm M2 35.360 285,789.950 10,105,532.63
9. Penanaman Pohon Bunga Pohon 24.000 250,000.000 0.00
10. Penanaman Rumput Jepang M2 25.000 35,000.000 0.00
11. Plesteran 1:3 M2 91.180 81,360.499 7,418,450.30
12. Acian M2 91.180 26,027.375 2,373,176.05
13. Pengecatan M2 91.180 52,444.025 4,781,846.20

Sub Jumlah PEK. BAK TANAMAN 81,163,542.29


d PEK. TANGGA AKSES
1. Galian Tanah M3 66.060 80,011.250 5,285,543.18
2. Pas. Batu Kosong M3 16.515 645,469.125 10,659,922.60
3. Pas. Batu Gunung 1:4 M3 94.319 1,165,602.625 109,938,473.99
4. Pas. Lantai Batu Koral M2 73.400 372,763.875 27,360,868.43
5. Pas. Pancang Kayu Bulat dia. 12-15 cm, P=2 m Btg 110.100 175,000.000 19,267,500.00
6. Plesteran 1:3 M2 36.700 81,360.499 2,985,930.31
7. Acian M2 36.700 26,027.375 955,204.66
8. Pengecatan M2 36.700 52,444.025 1,924,695.72

Sub Jumlah PEK. TANGGA AKSES 178,378,138.88


e PEK. JOGGING TREK
1. Galian Tanah M3 5.728 80,011.250 458,304.44
2. Urugan Tanah M3 13.031 177,088.500 2,307,675.66
3. Urugan Pasir M3 9.308 349,404.500 3,252,257.09
4. Pek. Kansteen Rabat Beton 1:3:5 M3 10.597 1,248,054.750 13,225,386.57
5. Rabat Beton dibawah lantai 1:3:5 M3 9.308 1,248,054.750 11,616,893.61
6. Pas. Lantai Batu Alam Candi M2 172.370 372,763.875 64,253,447.19
7. Pas. Batu Alam Palimanan M2 42.430 379,721.375 16,111,437.30
8. Plesteran 1:3 M2 28.640 81,360.499 2,330,164.69
9. Acian M2 28.640 26,027.375 745,424.02
10. Pengecatan M2 28.640 52,444.025 1,501,996.88

Sub Jumlah PEK. JOGGING TREK 0.00


JUMLAH PEK. LANDMARK 845,409,771.91
HARGA JUMLAH
NO. URAIAN DAN JENIS PEKERJAAN SATUAN VOLUME SATUAN HARGA
(Rp) (Rp)

III PEK. AKHIR


1. Perapihan/Pembersihan Akhir Ls 1.00 2,000,000.00 2,000,000.00

JUMLAH PEK. AKHIR 2,000,000.00


REAL COST 862,459,771.91
REKAPITULASI
ENGINER ESTIMATE (E.E.)

INSTANSI : DINAS PARIWISATA KABUPATEN BUTON TENGAH.


PEKERJAAN : PEMBANGUNAN GEDUNG TEMPAT IBADAH PANTAI MAOBU.
LOKASI : KEC. MAWASANGKA TENGAH, KAB. BUTON TENGAH
TAHUN ANGGARAN : 2018

NO MATA PEMBAYARAN HARGA (Rp)

1 2 3

A PEKERJAAN PENDAHULUAN 7,000,000.00


B PEKERJAAN PEMB. TEMPAT IBADAH 188,731,605.61
C PEKERJAAN FINISHING 1,000,000.00

REAL COST ( A +B +C ) 196,731,605.61


PPN 10 % 19,673,160.56
TOTAL 216,404,766.17
DIBULATKAN 216,400,000.00
TERBILANG : DUA RATUS JUTA RUPIAH

Labungkari, 21 Pebruari 2018


Mengetahui/Menyetujui : Dibuat Oleh :
Pejabat Pembuat Komitmen (PPK) Konsultan Perencana
Dinas Pariwisata Kab. Buton Tengah CV. TIOFAN ADIKARYA KONSULTAN

SAFRIN, S.ST.Par RACHMAWATI, D.M., S.Pd


NIP. 19750713 200502 1 004 Direktur
ENGINER ESTIMATE (E.E.)
KEGIATAN : DINAS PARIWISATA KABUPATEN BUTON TENGAH.
PEKERJAAN : PEMBANGUNAN GEDUNG TEMPAT IBADAH PANTAI MAOBU.
TAHUN ANGGARAN : 2018
LOKASI : KEC. MAWASANGKA TENGAH, KAB. BUTON TENGAH

HARGA JUMLAH
No. URAIAN PEKERJAAN SATUAN VOLUME KETERANGAN
SATUAN (Rp) HARGA (RP)

A. PEKERJAAN PENDAHULUAN
1 Pembersihan Lokasi Ls 1.00 1,000,000.00 1,000,000.00
2 Administrasi, Pelaporan dan Dokumentasi Ls 1.00 3,000,000.00 2,000,000.00
3 Pengukuran, Pas. Bouplank dan Barak Kerja Ls 1.00 4,500,000.00 4,000,000.00
Sub Total A 7,000,000.00
B. PEKERJAAN PEMB. TEMPAT IBADAH
I. PEKERJAAN TANAH DAN PASIR
1 Galian Tanah Pondasi M3 2.45 106,462.40 260,832.88
4 Urugan Pasir Bawah Lantai M3 2.75 349,404.50 959,604.52
5 Urugan/Pemadatan Tanah Bawah Lantai M3 25.32 177,088.50 4,483,349.55
Sub Total B.I 5,703,786.95
II. PEKERJAAN PONDASI
2 Pek. Pas. Batu gunung 1 : 5 M3 8.26 1,118,544.63 9,239,178.60
Sub Total B.II 9,239,178.60
III. PEKERJAAN BETON
1 Pek. Sloop Beton 15/20 Cm, 1 : 2 : 3 M3 1.47 6,198,290.13 9,102,189.05
2 Pek. Ringbalk 15/15 Cm, 1 : 2 : 3 M1 48.95 116,366.20 5,696,125.49
3 Pek. Kolom Beton 15/15 Cm, 1 : 2 : 3 M3 1.93 6,748,974.16 13,047,116.85
4 Pek. Kolom Beton 20/20 Cm, 1 : 2 : 3 M3 0.46 6,364,496.36 2,953,126.31
5 Pek. Plat Beton bertulang, 1 : 2 : 3 M3 3.61 7,067,757.98 25,545,704.42
Sub Total B.III 56,344,262.12
IV. PEKERJAAN PASANGAN BATA, PLESTERAN & DINDING
1 Pek. Dinding Pas. Bata 1 : 5 M2 92.24 180,264.57 16,627,603.94
2 Pek. Plesteran Dinding 1 : 3 M2 167.48 81,360.50 13,626,256.37
3 Pek. List Profil Beton M1 44.16 99,162.09 4,378,997.67
4 Pek. Pas. Dinding Batu Alam M2 22.16 379,721.38 8,413,866.23
5 Pek. Acian Dinding & Kolom M2 181.40 26,027.38 4,721,365.83
Sub Total B.IV 47,768,090.04
V. PEKERJAAN ATAP
1 Pek. Kuda-kuda Rangka Kayu Kls II M3 0.63 7,693,787.50 4,856,503.32
2 Pek. Gording + Kaso + Reng Kayu Kls II M3 0.79 6,702,027.50 5,309,104.91
3 Pek. Atap Sakura Roof M2 53.05 118,659.30 6,295,018.26
4 Pek. Nok Sakura Roof M1 17.32 128,658.09 2,228,358.12
5 Pek. Lisplank Papan Kls II M1 34.48 95,892.75 3,306,382.02
6 Pek. Pas. Kubah Stainless Dia 60 cm BH 1.00 500,000.00 500,000.00
7 Pek. Pas. Kubah Stainless Dia 100 cm BH 1.00 950,000.00 -
8 Pek. Pas. Kubah Stainless Dia 125 cm BH 4.00 1,200,000.00 4,800,000.00
Sub Total B.VI 27,295,366.63
VI. PEKERJAAN LANTAI
1 Pek.Lantai Rabat Beton 1 : 3 : 5 M3 1.66 1,248,054.75 2,069,774.00
2 Pek.Lantai Granite 60 x 60 M2 25.86 285,789.95 7,391,566.10
Sub Total B.VI 9,461,340.09
VII. PEKERJAAN PLAFOND
1 Pek. Rangka plafond kayu kelas II M2 25.68 152,858.00 3,925,393.44
2 Pek.Plafon Tripleks 3 mm M2 25.68 59,226.01 1,520,923.84
Sub Total B.VII 5,446,317.28
VIII. PEKERJAAN KUSEN, PINTU, JENDELA
1 Pek. Kusen Kayu Kelas II M3 0.05 9,102,537.50 458,767.89
2 Pek. Pintu Panel Kelas II M2 2.51 812,762.50 2,040,033.88
3 pek. Kusen aluminium M1 104.04 97,445.42 10,138,221.76
4 Pek. Jendela Bingkai Alumunium dan Kaca M2 19.26 497,835.00 9,588,302.10
Sub Total B.VIII. 22,225,325.62
X. PEKERJAAN KUNCI & PENGGANTUNG
1 Pek. Pas. Kunci Tanam Pintu Hendel stainless Unit 1.00 352,466.95 352,466.95
2 Pek. Pas. Engsel Pintu Pasang 4.00 130,670.94 522,683.74
3 Pek. Pas Grendel Pintu BH 1.00 59,303.20 59,303.20
Sub Total B.X. 934,453.89
XI PEKERJAAN PENGECATAN
1 Pek. Cat Dinding Luar M2 181.40 21,790.78 3,952,846.59
REKAPITULASI
ENGINER ESTIMATE (E.E.)

INSTANSI : DINAS PARIWISATA KABUPATEN BUTON TENGAH


PEKERJAAN : PEMBANGUNAN GEDUNG TEMPAT IBADAH PANTAI MUTIARA.
LOKASI : KEC. MAWASANGKA, KAB. BUTON TENGAH.
TAHUN ANGGARAN : 2018

NO MATA PEMBAYARAN HARGA (Rp)


1 2 3

A PEKERJAAN PENDAHULUAN 7,000,000.00


B PEKERJAAN PEMB. TEMPAT IBADAH 188,731,605.61
C PEKERJAAN FINISHING 1,000,000.00

REAL COST ( A +B +C ) 196,731,605.61


PPN 10 % 19,673,160.56
TOTAL 216,404,766.17
DIBULATKAN 216,400,000.00
TERBILANG : DUA RATUS JUTA RUPIAH

Labungkari, 21 Pebruari 2018


Mengetahui/Menyetujui : Dibuat Oleh :
Pejabat Pembuat Komitmen (PPK) Konsultan Perencana
Dinas Pariwisata Kab. Buton Tengah CV. TIOFAN ADIKARYA KONSULTAN

SAFRIN, S.ST.Par RACHMAWATI, D.M., S.Pd


NIP. 19750713 200502 1 004 Direktur
ENGINER ESTIMATE (E.E.)
INSTANSI : DINAS PARIWISATA KABUPATEN BUTON TENGAH.
PEKERJAAN : PEMBANGUNAN GEDUNG TEMPAT IBADAH PANTAI MUTIARA.
TAHUN ANGGARAN : 2018
LOKASI : KABUPATEN BUTON TENGAH

HARGA JUMLAH
No. URAIAN PEKERJAAN SATUAN VOLUME SATUAN (Rp) HARGA (RP) KETERANGA

A. PEKERJAAN PENDAHULUAN
1 Pembersihan Lokasi Ls 1.00 1,000,000.00 1,000,000.00
2 Administrasi, Pelaporan dan Dokumentasi Ls 1.00 3,000,000.00 2,000,000.00
3 Pengukuran, Pas. Bouplank dan Barak Kerja Ls 1.00 4,500,000.00 4,000,000.00
TOTAL JUMLAH A. 7,000,000.00
B. PEKERJAAN PEMB. TEMPAT IBADAH
I. PEKERJAAN TANAH DAN PASIR
1 Galian Tanah Pondasi M3 2.45 106,462.40 260,832.88
2 Urugan Pasir Bawah Lantai M3 2.75 349,404.50 959,604.52
3 Urugan/Pemadatan Tanah Bawah Lantai M3 25.32 177,088.50 4,483,349.55
Sub Total B.I 5,703,786.95
II. PEKERJAAN PONDASI
1 Pek. Pas. Batu gunung 1 : 5 M3 8.26 1,118,544.63 9,239,178.60
Sub Total B.II 9,239,178.60
III. PEKERJAAN BETON
1 Pek. Sloop Beton 15/20 Cm, 1 : 2 : 3 M3 1.47 6,198,290.13 9,102,189.05
2 Pek. Ringbalk 15/15 Cm, 1 : 2 : 3 M1 48.95 116,366.20 5,696,125.49
3 Pek. Kolom Beton 15/15 Cm, 1 : 2 : 3 M3 1.93 6,748,974.16 13,047,116.85
4 Pek. Kolom Beton 20/20 Cm, 1 : 2 : 3 M3 0.46 6,364,496.36 2,953,126.31
5 Pek. Plat Beton bertulang, 1 : 2 : 3 M3 3.61 7,067,757.98 25,545,704.42
Sub Total B.III 56,344,262.12
IV. PEKERJAAN PASANGAN BATA, PLESTERAN & DINDING
1 Pek. Dinding Pas. Bata 1 : 5 M2 92.24 180,264.57 16,627,603.94
2 Pek. Plesteran Dinding 1 : 3 M2 167.48 81,360.50 13,626,256.37
3 Pek. List Profil Beton M1 44.16 99,162.09 4,378,997.67
4 Pek. Pas. Dinding Batu Alam (Candi+Palimanan) M2 22.16 379,721.38 8,413,866.23
5 Pek. Acian Dinding & Kolom M2 181.40 26,027.38 4,721,365.83
Sub Total B.IV 47,768,090.04
V. PEKERJAAN ATAP
1 Pek. Kuda-kuda Rangka Kayu Kls II M3 0.63 7,693,787.50 4,856,503.32
2 Pek. Gording + Kaso + Reng Kayu Kls II M3 0.79 6,702,027.50 5,309,104.91
3 Pek. Atap Metal Roof M2 53.05 118,659.30 6,295,018.26
4 Pek. Nok Metal Roof M1 17.32 128,658.09 2,228,358.12
5 Pek. Lisplank Papan Kls II M1 34.48 95,892.75 3,306,382.02
6 Pek. Pas. Kubah Stainless Dia 60 cm BH 1.00 500,000.00 500,000.00
7 Pek. Pas. Kubah Stainless Dia 125 cm BH 4.00 1,200,000.00 4,800,000.00
Sub Total B.V 27,295,366.63

51/98
HARGA JUMLAH
No. URAIAN PEKERJAAN SATUAN VOLUME SATUAN (Rp) HARGA (RP) KETERANGA

VI. PEKERJAAN LANTAI


1 Pek.Lantai Rabat Beton 1 : 3 : 5 M3 1.66 1,248,054.75 2,069,774.00
2 Pek.Lantai Sejenis Granite 60 x 60 cm M2 25.86 285,789.95 7,391,566.10
Sub Total B.VI 9,461,340.09
VII. PEKERJAAN PLAFOND
1 Pek. Rangka plafond kayu kelas II M2 25.68 152,858.00 3,925,393.44
2 Pek.Plafon Tripleks 3 mm M2 25.68 59,226.01 1,520,923.84
Sub Total B.VII 5,446,317.28
VIII. PEKERJAAN KUSEN, PINTU, JENDELA
1 Pek. Kusen Kayu Kelas II M3 0.05 9,102,537.50 458,767.89
2 Pek. Pintu Panel Kelas II M2 2.51 812,762.50 2,040,033.88
3 pek. Kusen aluminium M1 104.04 97,445.42 10,138,221.76
4 Pek. Jendela Bingkai Alumunium dan Kaca M2 19.26 497,835.00 9,588,302.10
Sub Total B.VIII. 22,225,325.62
IX. PEKERJAAN KUNCI & PENGGANTUNG
1 Pek. Pas. Kunci Tanam Pintu Hendel stainless Unit 1.00 352,466.95 352,466.95
2 Pek. Pas. Engsel Pintu Pasang 4.00 130,670.94 522,683.74
3 Pek. Pas Grendel Pintu BH 1.00 59,303.20 59,303.20
Sub Total B.IX. 934,453.89
X. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding M2 181.40 21,790.78 3,952,846.59
2 Pek. Cat Lits Plank M2 6.90 52,296.66 360,637.79
Sub Total B.X. 4,313,484.38
TOTAL JUMLAH B. 188,731,605.61
C. PEKERJAAN FINISHING
1 Pek. Pembersihan Akhir Ls 1.00 1,000,000.00 1,000,000.00
TOTAL JUMLAH C. 1,000,000.00
REAL COST 196,731,605.61

52/98
REKAPITULASI
DAFTAR KUANTITAS DAN HARGA

INSTANSI : DINAS PARIWISATA KABUPATEN BUTON TENGAH.


PEKERJAAN : PEMBUATAN TEMPAT PARKIR KONBLOK PANTAI MAOBU (DAK).
LOKASI : KEC. MAWASANGKA TENGAH, KAB. BUTON TENGAH
TAHUN ANGGARAN : 2018

NO MATA PEMBAYARAN HARGA (Rp)

1 2 3

A PEKERJAAN PENDAHULUAN 7,000,000.00


B PEMBUATAN TEMPAT PARKIR 192,756,762.92
C PEKERJAAN FINISHING 1,000,000.00

REAL COST ( A +B +C ) 200,756,762.92


PPN 10 % 20,075,676.29
TOTAL 220,832,439.21
DIBULATKAN 220,800,000.00
TERBILANG : DUA RATUS JUTA RUPIAH

Labungkari, 21 Pebruari 2018


Mengetahui/Menyetujui : Dibuat Oleh :
Pejabat Pembuat Komitmen (PPK) Konsultan Perencana
Dinas Pariwisata Kab. Buton Tengah CV. TIOFAN ADIKARYA KONSULTAN

SAFRIN, S.ST.Par RACHMAWATI, D.M., S.Pd


NIP. 19750713 200502 1 004 Direktur
ENGINER ESTIMATE (E.E.)
INSTANSI : DINAS PARIWISATA KABUPATEN BUTON TENGAH.
PEKERJAAN : PEMBUATAN TEMPAT PARKIR KONBLOK PANTAI MAOBU (DAK).
LOKASI : KEC. MAWASANGKA TENGAH, KAB. BUTON TENGAH
TH. ANGGARAN : 2018

HARGA JUMLAH
NO. URAIAN DAN JENIS PEKERJAAN SATUAN VOLUME SATUAN HARGA
(Rp) (Rp)

I. PEK. PENDAHULUAN
1. Pembersihan awal Lokasi Ls 1.00 1,000,000.00 1,000,000.00
2. Pengukuran / Pas. Bouwplank Ls 1.00 1,500,000.00 1,500,000.00
3. Pembuatan Gudang/Barak Kerja Ls 1.00 2,500,000.00 2,500,000.00
4. Administrasi (Dokumentasi, P3K, As Built Drawing) Ls 1.00 2,000,000.00 2,000,000.00

JUMLAH PEK. PENDAHULUAN 7,000,000.00


II. PEMBUATAN TEMPAT PARKIR
A. PEKERJAAN TANAH DAN PASIR
1. Pek. Galian Tanah M3 2.71 106,462.40 288,711.59
2. Urugan Tanah M3 95.94 177,088.50 16,989,870.69

B. PEKERJAAN PASANGAN BATU, DINDING DAN PLASTERAN


1. Pas. Batu Gunung Camp. 1:5 M3 29.11 1,118,544.63 32,556,359.86
2. Pek. Plesteran camp. 1:5 M2 86.00 77,063.04 6,627,036.21
3. Pek. Pelicinan dengan Air Semen (Acian) M2 86.00 26,027.38 2,238,224.11

C. PEKERJAAN LANTAI
1. Pek. Lantai Rabat Beton 1:3:5 M3 3.15 1,248,054.75 3,931,372.46
2. Pek. Lantai Paving Block M3 564.50 219,003.13 123,627,264.06

D. PEKERJAAN FINISHING/PENGECETAN
1. Pekerjaan Cat Tembok Anti Air ex. Mowilex M2 86.00 52,444.03 4,509,923.93

E. PEKERJAAN LAIN-LAIN
1. Penanaman Rumput Jepang M2 99.40 20,000.00 1,988,000.00
JUMLAH PEMBUATAN TEMPAT PARKIR 192,756,762.92
III. PEK. AKHIR/FINISHING
1. Pek. Perapihan/Pembersihan Ls 1.000 1,000,000.000 1,000,000.00

TOTAL PEK. AKHIR/FINISHING 1,000,000.00


REKAPITULASI
DAFTAR KUANTITAS DAN HARGA

INSTANSI : DINAS PARIWISATA KABUPATEN BUTON TENGAH.


PEKERJAAN : PEMBUATAN TRAP-TRAP PANTAI MAOBU.
LOKASI : KEC. MAWASANGKA TENGAH, KAB. BUTON TENGAH
TAHUN ANGGARAN : 2018

NO MATA PEMBAYARAN HARGA (Rp)

1 2 3

A PEK. PENDAHULUAN 2,550,000.00


B PEMBUATAN TRAP-TRAP. 28,287,437.45
C PEK. AKHIR/FINISHING 500,000.00

REAL COST ( A +B +C ) 31,337,437.45


PPN 10 % 3,133,743.74
TOTAL 34,471,181.19
DIBULATKAN 34,400,000.00
TERBILANG : TIGA PULUH JUTA RUPIAH

Labungkari, 21 Pebruari 2018


Mengetahui/Menyetujui : Dibuat Oleh :
Pejabat Pembuat Komitmen (PPK) Konsultan Perencana
Dinas Pariwisata Kab. Buton Tengah CV. TIOFAN ADIKARYA KONSULTAN

SAFRIN, S.ST.Par RACHMAWATI, D.M., S.Pd


NIP. 19750713 200502 1 004 Direktur
ENGINER ESTIMATE (E.E.)
INSTANSI : DINAS PARIWISATA KABUPATEN BUTON TENGAH.
PEKERJAAN : PEMBUATAN TRAP-TRAP PANTAI MAOBU.
LOKASI : KEC. MAWASANGKA TENGAH, KAB. BUTON TENGAH
TH. ANGGARAN : 2018

HARGA JUMLAH
NO. URAIAN DAN JENIS PEKERJAAN SATUAN VOLUME SATUAN HARGA
(Rp) (Rp)

I. PEK. PENDAHULUAN
1. Pembersihan awal Lokasi Ls 1.00 500,000.00 500,000.00
2. Pengukuran / Pas. Bouwplank Ls 1.00 700,000.00 700,000.00
3. Pembuatan Gudang/Barak Kerja Ls 1.00 800,000.00 800,000.00
4. Administrasi (Dokumentasi, P3K, As Built Drawing) Ls 1.00 550,000.00 550,000.00

JUMLAH PEK. PENDAHULUAN 2,550,000.00

II. PEMBUATAN TRAP-TRAP.


1. Urugan Pasir M3 0.60 349,404.50 209,642.70
2. Urugan Tanah M3 33.51 177,088.50 5,933,527.28
3. Pas. Batu Gunung Camp. 1:5 M3 15.34 1,118,544.63 17,156,237.46
4. Pek. Lantai Rabat Beton Camp. 1:3:5 M3 0.60 1,248,054.75 748,832.85
5. Pek. Lantai Batu Tempel (Koral) M2 8.00 372,763.88 2,982,111.00
6. Pek. Plesteran camp. 1:4 M2 16.00 78,567.89 1,257,086.16
7. Pek. Pelicinan dengan Air Semen (Acian) M2 0.00 26,027.38 0.00
8. Pek. Pengecatan anti lumut. M2 0.00 52,444.03 0.00
JUMLAH 28,287,437.45
III. PEK. AKHIR/FINISHING
1. Pek. Perapihan/Pembersihan Ls 1.000 500,000.000 500,000.00

TOTAL PEK. AKHIR/FINISHING 500,000.00


REKAPITULASI
ENGINEER ESTIMATE (E.E.)

INSTANSI : DINAS PARIWISATA KABUPATEN BUTON TENGAH.

PEKERJAAN : PEMBUATAN PAGAR PEMBATAS PANTAI MUTIARA DESA GUMANANO KEC. MAWASANGKA
TAHUN ANGGARAN : KABUPATEN BUTON TENGAH
LOKASI : 2019

NO MATA PEMBAYARAN HARGA (Rp)

1 2 3

I PEK. PENDAHULUAN 5,500,000.00

II PEKERJAAN PAGAR PEMBATAS PANTAI MUTIARA (PANJANG 236 M') 494,794,052.35

III PEKERJAAN PAGAR PEMBATAS PINTU GERBANG (PANJANG 68,15 M') 278,614,021.22

IV PEK. AKHIR/FINISHING 1,000,000.00

REAL COST 779,908,073.57


PPN 10 % 77,990,807.36
TOTAL 857,898,880.93
DIBULATKAN 857,898,000.00

TERBILANG : Delapan Ratus Lima Puluh Tujuh Juta Delapan Ratus Sembilan Puluh Delapan Ribu Rupiah.

Labungkari, Mei 2019


Diperiksa/Menyetujui : Dibuat Oleh :
Plt. Kepala Dinas Pariwisata Konsultan Perencana
Kabupaten Buton Tengah CV. FORMULASI KONSULTAN

SAFRIN, S.ST.Par HAMRIADI, A.Md


NIP. 19750713 200502 1 004 Direktur
ENGINER ESTIMATE (E.E.)
INSTANSI : DINAS PARIWISATA KABUPATEN BUTON TENGAH.
PEKERJAAN : PEMBUATAN PAGAR PEMBATAS PANTAI MUTIARA DESA GUMANANO KEC. MAWASANGKA (DAK)
LOKASI : KABUPATEN BUTON TENGAH
TH. ANGGARAN : 2019

HARGA JUMLAH
NO. URAIAN DAN JENIS PEKERJAAN SATUAN VOLUME SATUAN HARGA
(Rp) (Rp)

I. PEK. PENDAHULUAN
1. Pembersihan Lokasi Ls 1.00 1,000,000.00 1,000,000.00
2. Pengukuran dan Pas. Bouwplank Ls 1.00 1,000,000.00 1,000,000.00
3. Keselamatan Kerja (K3) Ls 1.00 3,500,000.00 3,500,000.00
JUMLAH PEK. PENDAHULUAN 5,500,000.00
II. PEKERJAAN PAGAR PEMBATAS PANTAI MUTIARA (PANJANG 236 M')
1. Galian Tanah M3 82.731 161,667.000 13,374,832.16
2. Pas. Pondasi Batu Gunung 1:5 M3 165.200 1,118,544.625 184,783,572.05
3. Urugan Tanah M3 73.066 177,088.500 12,939,077.51
4. Pek. Sloof Beton Bertulang M3 7.080 6,198,290.125 43,883,894.09
5. Pondasi Beton Bertulang 1:2:3 M3 2.491 5,401,313.100 13,453,320.60
6. Kolom Beton Bertulang 1:2:3 M3 18.390 4,899,856.356 90,107,079.52
7. Pek. Plesteran 1:5 M2 876.026 77,063.041 67,509,258.38
8. Pek. Acian Semen M2 876.026 26,027.375 22,800,667.62
9. Pengecatan (fin. Cat Jotun Jotashield Extreme) M2 876.026 52,444.025 45,942,350.42
JUMLAH PEKERJAAN PAGAR PEMBATAS PANTAI MUTIARA (PANJANG 236 M') 494,794,052.35
III. PEKERJAAN PAGAR PEMBATAS PINTU GERBANG (PANJANG 68,15 M')
1. Galian Tanah M3 34.035 161,667.000 5,502,336.35
2. Pas. Pondasi Batu Gunung 1:5 M3 170.225 1,118,544.625 190,404,258.79
3. Pek. Plesteran 1:5 M2 180.598 77,063.041 13,917,392.55
4. Pek. Acian Semen M2 180.598 26,027.375 4,700,478.86
5. Pek. Pasangan Batu Sika Lokal M2 146.523 372,763.875 54,618,294.87
6. Pengecatan (fin. Cat Jotun Jotashield Extreme) M2 180.598 52,444.025 9,471,259.80
JUMLAH PEKERJAAN PAGAR PEMBATAS PINTU GERBANG (PANJANG 68,15 M') 278,614,021.22
III. PEK. AKHIR/FINISHING
1. Pek. Perapihan/Pembersihan Ls 1.000 1,000,000.000 1,000,000.00

JUMLAH PEK. AKHIR/FINISHING 1,000,000.00


REAL COAST 779,908,073.57

Labungkari, Mei 2019


Dibuat Oleh :
Konsultan Perencana
CV. FORMULASI KONSULTAN

HAMRIADI, A.Md
Direktur
DAFTAR HARGA SATUAN UPAH DAN BAHAN

Harga Satuan
No. Uraian Satuan
(Rp.)
1 2 3 4
I UPAH KERJA
1 Mandor Oh 143,000.00
2 Pekerja Oh 88,000.00
3 Kepala Tukang Oh 159,500.00
4 Tukang Kayu Oh 132,000.00
5 Tukang Batu Oh 132,000.00
6 Tukang Cat Oh 132,000.00
7 Tukang Besi Konstruksi Oh 132,000.00
8 Tukang Oh 132,000.00
II HARGA BAHAN ###
1 Pasir Urug M3 230,000.00
2 Pasir Beton M3 275,000.00
3 Pasir Pasang M3 275,000.00
4 Batu Gunung M3 275,000.00
5 Kerikil Beton M3 425,000.00
6 Portland semen (tonasa 50 kg) Kg 1,760.00
7 Kawat Bidrat/ kawat beton Kg 32,000.00
8 Besi Beton Polos Kg 14,000.00
9 Paku Campur Kg 27,000.00
10 Cat Dasar (Ex. Jotun Ultra Primer) Kg 80,000.00
11 Cat Penutup (Ex. Jotun Jotashield Extreme) Kg 110,000.00
12 Kuas 3" Bh 15,000.00
13 air Ltr 100.00
14 Minyak Bekisting Ltr 16,500.00
15 Papan kayu kelas IV (perancah) M3 1,980,000.00
16 Balok Kayu Kelas III M3 2,200,000.00
17 Dolken dia. 5-10 cm Btg 9,587.00
18 Batu Koral M2 159,500.00

Labungkari, Mei 2019


Dibuat Oleh : Pompa dan Con
Konsultan Perencana Tang / alat pemo
CV. FORMULASI KONSULTAN Theodolit
###
Excavator (stand
Vibrator beton (p
Vibro Roller
HAMRIADI, A.Md Beton Molen (Co
Direktur Jack hammer
Water Tank
Kereta dorong

59/98
DAFTAR KUANTITAS DAN HARGA

PEKERJAAN PERSIAPAN
- Membuat Pagar Sementara dari Kayu Tinggi 2 meter M #REF! #REF!
- M #REF! #REF!
Membuat Pagar Sementara dari Seng Gelombang Tinggi 2 Meter
- Membuat Pagar Sementara dari Kawat Duri Tinggi 1,8 Meter M #REF! #REF!
- Mengukur dan Memasang Bouwplank M #REF! #REF!
- Membuat Kantor Sementara dengan Lantai Plesteran M2 1,876,732.14 -
- Membuat Gudang Semen dan Alat-alat M2 1,640,889.98 -
- Membuat Rumah Jaga / Konstruksi Kayu M2 1,799,988.49 -
- Membersihkan Lapangan dan Perataan M2 18,342.50 -
- Membuat Bedeng Buruh M2
1,560,767.06 -
- Membuat Bak Adukan Ukuran (40 x 50 x 20) cm M2 135,314.75 -
- Membuat Stegger dari Bambu, Ukuran (40 x 50 x 20) cm M2 511,740.70 -
- Membuat Jalan Sementara M2 195,781.75 -
- Membongkar Beton Bertulang M3 1,458,924.50 -
- Membongkar Dinding Tembok Bata Merah M3 729,462.25 -
- Memasang 1 m2 Pagar Kawat Jaring Galvanis, panjang 240 cm M 12,131.35 -
- Memasang Panel Beton Pracetak (5 x 50 x 213) cm M 248,090.65 -
PEKERJAAN TANAH
- Menggali Tanah Biasa Sedalam 1 Meter M2 80,011.25 -
- Menggali Tanah Biasa Sedalam 2 Meter M3 98,480.25 -
- Menggali Tanah Biasa Sedalam 3 Meter M3 117,278.15 -
- Menggali Tanah Keras Sedalam 1 Meter M3 106,462.40 -
- Menggali Tanah Cadas Sedalam 1 Meter M3 161,667.00 -
- Menggali Tanah Lumpur Sedalam 1 Meter M3 128,840.25 -
- Mengerjakan Stripping Setinggi 1 Meter M2 5,882.25 -
- Membuang Tanah Sejauh 30 Meter M3 35,040.50 -
- Mengurug tanah biasa sedalam 1 meter M3 26,664.94 -
- Mengurug tanah biasa sedalam 2 meter M3 32,826.75 -
- Mengurug tanah biasa sedalam 3 meter M3 39,087.24 -
- Mengurug tanah keras sedalam 1 meter M3 35,473.13 -
- Mengurug tanah cadas sedalam 1 meter M3 53,889.00 -
- Mengurug tanah lumpur sedalam 1 meter M3 42,946.75 -
- Memadatkan Tanah (per 20 cm) M3 58,822.50 -
- Mengurug Pasir M3 349,404.50 -
- M3 238,634.76 -
Membuat Lapisan Pudel Campuran 1 Kp : 3 Psr : 7 TL untuk stabilisasi tanah.
- M3 140,800.06 -
Membuat Lapisan Pudel Campuran 1 Kp : 5 TL untuk stabilisasi tanah.
- Memasang Lapisan Ijuk tebal 10 cm, untuk bidang resapan. M3 100,446.75 -
- Mengurug Sirtu padat untuk peninggian lantai bangunan M3 144,365.25 -
- Memadatkan 1 m3 tanah didatangkan M3 177,088.50 -
PEKERJAAN PONDASI
- Memasang pondasi batu belah, campuran 1 PC : 3 PP M3 1,233,469.88 -
- Memasang pondasi batu belah, campuran 1 PC : 4 PP M3 1,165,602.63 -
- Memasang pondasi batu belah, campuran 1 PC : 5 PP M3 1,118,544.63 -
- Memasang pondasi batu belah, campuran 1 PC : 6 PP M3 1,085,464.88 -
- Memasang pondasi batu belah, campuran 1 PC : 8 PP M3 1,040,114.63 -
- Memasang Pondasi Batu Kali, 1 Kp :1 SM : 2 Ps M3 780,179.87 -
- M3 951,201.34 -
Memasang pondasi batu belah, campuran 1 PC : 3 KP : 10 PP
- M3 920,426.94 -
Memasang pondasi batu belah, campuran ¼ PC : 1 KP : 4 PP
- Memasang batu kosong (anstamping) M3 645,469.13 -
- M3 #REF! #REF!
Memasang pondasi siklop, 60% beton campuran 1 PC : 2 PB : 3 KR dan 40% batu belah
- Memasang pondasi sumuran, diameter 100 cm M3 1,260,937.05 -
PEKERJAAN BETON
- M3 1,310,139.14 -
Membuat beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87
- M3 1,364,280.02 -
Membuat beton mutu f’c = 9,8 MPa (K 125), slump (12 ± 2) cm, w/c = 0,78
- M3 1,406,091.31 -
Membuat beton mutu f’c = 12,2 MPa (K 150), slump (12 ± 2) cm, w/c = 0,72
- M3 1,227,389.86 -
Membuat lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87
- M3 1,248,054.75 -
Membuat beton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66
- M3 1,503,071.11 -
Membuat beton mutu f’c = 16,9 MPa (K 200), slump (12 ± 2) cm, w/c = 0,61
- M3 1,539,865.24 -
Membuat beton mutu f’c = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58
- M3 1,561,925.59 -
Membuat beton mutu f’c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56
- M3 1,599,939.96 -
Membuat beton mutu f’c = 24,0 MPa (K 275), slump (12 ± 2) cm, w/c = 0,53
- M3 1,611,620.10 -
Membuat beton mutu f’c = 26,4 MPa (K 300), slump (12 ± 2) cm, w/c = 0,52
- M3 1,718,155.60 -
Membuat beton mutu f’c = 28,8 MPa (K 325), slump (12 ± 2) cm, w/c = 0,49
- M3 1,733,521.70 -
Membuat beton mutu f’c = 31,2 MPa (K 350), slump (12 ± 2) cm, w/c = 0,48
- Membuat beton kedap air dengan strorox – 100 M3 1,665,887.13 -
- Memasang PVC Waterstop lebar 150 mm M 11,669.63 -
- Memasang PVC Waterstop lebar 200 mm M 13,788.50 -
- Membuat PVC Waterstop lebar 230 mm – 320 mm M 15,559.50 -
- Pembesian 10 kg dengan besi polos Kg 317,386.78 -
- Pembesian 10 kg dengan besi ulir Kg 186,790.48 -
- Memasang kabel presstressed polos/strands Kg #REF! #REF!
- Memasang jaring kawat baja/wire mesh Kg #REF! #REF!
- Memasang bekisting untuk pondasi M2 203,429.25 -
- Memasang bekisting untuk sloof M2 214,814.25 -
- Memasang bekisting untuk kolom M2 355,432.23 -
- Memasang bekisting untuk balok M2 363,022.23 -
- Memasang bekisting untuk plat lantai M2 386,882.43 -
- Memasang bekisting untuk dinding M3 #REF! #REF!
- Memasang bekisting untuk tangga M3 398,125.98 -
- Memasang jembatan untuk pengecoran beton M2 166,031.25 -
- Membuat pondasi beton bertulang (150 kg besi + bekisting) M3 7,678,888.10 -
- Membuat sloof beton bertulang (200 kg besi + bekisting) M3 6,198,290.13 -
- Membuat kolom beton bertulang (300 kg besi + bekisting) M3 6,748,974.16 -
- Membuat balok beton bertulang (200 kg besi + bekisting) M3 10,293,867.93 -
- Membuat Kolom beton bertulang (150 kg besi + bekisting) M3 7,067,757.98 -
- Membuat dinding beton bertulang (150 kg besi + bekisting) M3 #REF! #REF!
- Membuat dinding beton bertulang (200 kg besi + bekisting) M3 #REF! #REF!
- Membuat kolom praktis beton bertulang (11 x 11) cm M 148,176.35 -
- Membuat ring balok beton bertulang (10 x 15) cm M 116,366.20 -
PEKERJAAN DINDING
- M2 406,226.00 -
Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1
- M2 388,351.55 -
Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 3 PP
- M2 376,030.45 -
Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 4 PP
- M2 370,072.30 -
Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 5 PP
- M2 368,908.50 -
Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 6 PP
- M2 342,705.73 -
Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 3 KP : 10 PP
- M2 196,813.30 -
Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 PC : 2 PP
- M2 188,175.88 -
Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 PC : 3 PP
- M2 183,315.75 -
Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 PC : 4 PP
- M2 180,264.57 -
Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 PC : 5 PP
- M2 178,776.93 -
Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 PC : 6 PP
- M2 175,409.50 -
Memasang dinding bata merah ukuran (5 x 11 x 22) tebal ½ bata, campuran spesi 1 PC : 8 PP
- M2 171,453.51 -
Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 PC : 3 KP : 10 PP
- M2 152,283.24 -
Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 KP : 1 SM : 1 PP
- M2 155,412.47 -
Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 KP : 1 SM : 2 PP
- M2 89,219.82 -
Pemasangan rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, dinding partisi
- M2 42,535.63 -
Pemasangan rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm, plafon
- Memasang dinding conblock HB 20 , campuran spesi 1 PC : 3 PP M2 355,499.16 -
- Memasang dinding conblock HB 20, campuran spesi 1 PC : 4 PP M2 357,148.72 -
- Memasang dinding conblock HB 15, campuran spesi 1 PC : 3 PP M2 275,395.56 -
- Memasang dinding conblock HB 15, campuran spesi 1 PC : 4 PP M2 276,326.60 -
- Memasang dinding conblock HB 10, campuran spesi 1 PC : 3 PP M 2
195,639.84 -
- Memasang dinding conblock HB 10, campuran spesi 1 PC : 3 PP M2 197,097.12 -
- M2 83,173.75 -
Memasang dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran spesi 1 PC : 3 PP
- M2 83,173.75 -
Memasang dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran spesi 1 PC : 4 PP
- M2 96,804.13 -
Memasang dinding bata berongga ekspose ukuran (5 x 11 x 24) cm, campuran spesi 1 PC : 3 PP
- Memasang teakwood rangkap, rangka expose kayu kelas I M2 #REF! #REF!
- M 2
#REF! #REF!
Memasang teakwood rangkap lapis formika, rangka expose kayu kelas II
- M2 #REF! #REF!
Memasang rangka dinding pemisah (60 x 120) cm kayu kelas II
- M2 #REF! #REF!
Memasang rangka dinding pemisah (60 x 120) cm kayu kelas III
- M2 #REF! #REF!
Memasang dinding pemisah teakwood rangkap, rangka kayu kelas II
- M2 486,622.50 -
Memasang dinding pemisah plywood rangkap, rangka kayu kelas II
- Memasang dinding lambriziring dari papan kayu kelas I M2 #REF! #REF!
- M2 #REF! #REF!
Memasang dinding lambriziring dari plywood ukuran (120 x 240) cm
- Memasang dinding bilik, rangka kayu kelas III M2 #REF! #REF!
- Memasang dinding bilik, rangka kayu kelas IV M2 #REF! #REF!
PEKERJAAN PLESTERAN
- Memasang plesteran 1 PC : 1 PP, tebal 15 mm M2 94,788.22 -
- Memasang plesteran 1 PC : 2 PP, tebal 15 mm M2 99,162.09 -
- Memasang plesteran 1 PC : 3 PP, tebal 15 mm M2 81,360.50 -
- Memasang plesteran 1 PC : 4 PP, tebal 15 mm M2 78,567.89 -
- Memasang plesteran 1 PC : 5 PP, tebal 15 mm M2 77,063.04 -
- Memasang plesteran 1 PC : 6 PP, tebal 15 mm M2 75,824.86 -
- Memasang plesteran 1 PC : 7 PP, tebal 15 mm M2 75,169.59 -
- Memasang plesteran 1 PC : 8 PP, tebal 15 mm M2 74,514.32 -
- Memasang plesteran 1 PC : ½ KP : 3 PP, tebal 15 mm M2 75,597.09 -
- Memasang plesteran 1 PC : 2 KP : 8 PP, tebal 15 mm M2 72,236.87 -
- Memasang plesteran 1 SM : 1 KP : 1 PP, tebal 15 mm M2 62,730.32 -
- Memasang plesteran 1 SM : 1 KP : 2 PP, tebal 15 mm M2 64,611.18 -
- Memasang plesteran 1 PC : 2 PP, tebal 20 mm M2 114,256.32 -
- Memasang plesteran 1 PC : 3 PP, tebal 20 mm M2 93,266.93 -
- Memasang plesteran 1 PC : 4 PP, tebal 20 mm M2 105,086.08 -
- Memasang plesteran 1 PC : 5 PP, tebal 20 mm M2 103,185.04 -
- Memasang plesteran 1 PC : 6 PP, tebal 20 mm M2 101,428.71 -
- Memasang plesteran 1 SM : 1 KP : 2 PP, tebal 20 mm M2 91,344.62 -
- Memasang Berapen 1 PC : 5 PP, tebal 15 mm M2 48,062.92 -
- Memasang Plesteran Skoning 1 PC : 2 PP, lebar 10 mm M 81,934.05 -
- Memasang Plesteran Granit , 1 PC : 2 Granit, tebal 10 mm M2 #REF! #REF!
- M2 #REF! #REF!
Memasang Plesteran Teraso , 1 PC : 2 Batu Teraso, tebal 10 mm
- Memasang Plesteran Ciprat 1 PC : 2 PP M2 60,482.18 -
- M2 35,638.59 -
Memasang finishing siar pasangan dinding bata merah (=20 m’)
- M2 17,026.90 -
Memasang finishing siar pasangan dinding conblock ekspose (=8 m’)
- M2 74,975.29 -
Memasang finishing siar pasangan batu kali adukan 1 PC : 2 PP
- Memasang acian M2 26,027.38 -
PEKERJAAN PENUTUP LANTAI DAN DINDING
- Memasang lantai ubin PC abu-abu ukuran (40 x 40) cm M2 82,863.83 -
- Memasang lantai ubin PC abu-abu ukuran (30 x 30) cm M2 85,039.63 -
- Memasang lantai ubin PC abu-abu ukuran (20 x 20) cm M2 87,968.10 -
- Memasang lantai ubin warna ukuran (40 x 40) cm M2 115,753.83 -
- Memasang lantai Ubin Warna ukuran 30 x 30 cm M2 122,989.63 -
- Memasang lantai ubin warna ukuran (20 x 20) cm M2 128,954.10 -
- Memasang lantai ubin teraso ukuran (40 x 40) cm M2 115,753.83 -
- Memasang lantai ubin teraso ukuran (30 x 30) cm M2 122,989.63 -
- Memasang lantai ubin granit ukuran (40 x 40) cm M2 115,753.83 -
- Memasang Lantai ubin granit ukuran (30 x 30) cm M2 122,989.63 -
- Memasang lantai ubin teralux ukuran (40 x 40) cm M2 115,753.83 -
- Memasang lantai ubin teralux ukuran (30 x 30) cm M2 122,989.63 -
- Memasang lantai ubin teralux marmer ukuran (60 x 60) cm M2 118,290.15 -
- Memasang lantai ubin teralux marmer ukuran (40 x 40) cm M2 115,753.83 -
- Memasang lantai ubin teralux marmer ukuran (30 x 30) cm M2 122,989.63 -
- Memasang plint ubin PC abu-abu ukuran (15 x 20) cm M' 29,847.68 -
- Memasang plint ubin PC abu-abu ukuran (10 x 30) cm M' 28,701.59 -
- Memasang PC abu-abu ukuran (10 x 40) cm M' 28,701.59 -
- Memasang plint ubin warna ukuran (10 x 20) cm M' 31,029.19 -
- Memasang plint ubin warna ukuran (10 x 30) cm M' 31,029.19 -
- Memasang Plint Ubin Warna ukuran 10 x 40 cm M' 31,029.19 -
- Memasang plint ubin teraso ukuran (10 x 30) cm M' 31,029.19 -
- Memasang plint ubin teraso ukuran (10 x 40) cm M' 31,029.19 -
- Memasang plint ubin granit ukuran (10 x 40) cm M' 31,029.19 -
- Memasang plint ubin granit ukuran (10 x 30) cm M' 31,029.19 -
- Memasang plint ubin teralux kerang ukuran (10 x 40) cm M' 31,029.19 -
- Memasang plint ubin teralux kerang ukuran (10 x 30) cm M' 31,029.19 -
- Memasang plint ubin teralux marmer ukuran (10 x 60) cm M' 31,029.19 -
- Memasang plint ubin teralux marmer ukuran (10 x 40) cm M' 31,029.19 -
- Memasang plint ubin teralux marmer ukuran (10 x 30) cm M' 31,029.19 -
- Memasang lantai teraso cor ditempat, tebal 3 cm M2 72,547.75 -
- Memasang lantai keramik artistik ukuran (10 x 20) cm M2 236,528.44 -
- Memasang lantai keramik artistik ukuran (10 x 10) cm M2 247,913.44 -
- Memasang lantai keramik artistik ukuran (5 x 20) cm M2 247,913.44 -
- Memasang plint keramik ukuran (10 x 20) cm M' 29,131.69 -
- Memasang plint keramik ukuran (10 x 10) cm M' 29,764.19 -
- Memasang plint keramik ukuran (5 x 20) cm M' 65,560.44 -
- Memasang plint internal cove artistik ukuran (5 x 5 x 20) cm M' 215,542.09 -
- Memasang lantai keramik ukuran (20 x 20) cm M2 422,047.89 -
- Memasang lantai keramik ukuran (30 x 30) cm M2 418,202.29 -
- Memasang lantai keramik ukuran (33 x 33) cm M2 207,939.44 -
- Memasang lantai keramik ukuran (10 x 33) cm, variasi/border M2 349,019.83 -
- Memasang lantai mosaik ukuran (30 x 30) cm, campuran spesi 1 PC : 3 PP M2 320,788.08 -
- Memasang lantai marmer ukuran (100 x 100) cm M2 183,398.44 -
- Memasang underlayer / Pelapis bawah karpet M2 #REF! #REF!
- Memasang lantai karpet M2 #REF! #REF!
- Memasang lantai parquet kayu M2 #REF! #REF!
- Memasang lantai kayu (gymfloor) M2 #REF! #REF!
- Memasang dinding porselen ukuran (11 x 11) cm M2 264,339.00 -
- Memasang dinding porselin ukuran (10 x 20) cm M2 276,514.63 -
- Memasang dinding porselin ukuran (20 x 20) cm M2 256,021.63 -
- Memasang dinding keramik artistik ukuran (10 x 20) cm M2 383,177.13 -
- Memasang dinding keramik artistik ukuran (5 x 20) cm M2 1,047,517.75 -
- Memasang dinding keramik ukuran (10 x 20) cm M 2
492,887.13 -
- Memasang dinding keramik ukuran (20 x 20) cm M2 394,021.63 -
- Memasang dinding marmer ukuran (100 x 100) cm M2 #REF! #REF!
- Memasang dinding bata pelapis ukuran (3 x 7 x 24) cm M2 384,093.56 -
- Memasang dinding batu paras M2 170,996.38 -
- Memasang dinding batu tempel hitam M2 197,639.17 -
- Memasang lantai Vinyl ukuran (30 x 30) cm KL. I M2 #REF! #REF!
- Memasang wall paper, lebar 50 cm M2 #REF! #REF!
- Memasang floor hardener M2 33,547.80 -
- M #REF! #REF!
Memasang plint Vinyl karet ukuran (15 x 30) cm dengan perekat
- Memasang plint kayu kelas II tebal 2Cm, Lebar 10 Cm M 57,295.30 -
- Memasang dinding keramik ukuran (40 x 40) cm M2 301,816.35 -
PEKERJAAN PINTU DAN JENDELA
- M3 12,062,637.50 -
Membuat dan memasang kusen pintu dan kusen jendela, kayu kelas I
- M3 9,102,537.50 -
Membuat dan memasang kusen pintu dan kusen jendela, kayu kelas II
- M3 6,808,287.50 -
Membuat dan memasang kusen pintu dan kusen jendela, kayu kelas III
- M2 415,692.23 -
Membuat dan memasang pintu klamp standar, kayu kelas II
- M2 329,672.23 -
Membuat dan memasang pintu klamp sederhana, kayu kelas III untuk gudang sementara
- Membuat dan memasang daun pintu panel, kayu kelas I M2 812,762.50 -
- Membuat dan memasang daun pintu panel, kayu kelas II M2 812,762.50 -
- M2 672,347.50 -
Membuat dan memasang pintu dan jendela kaca, kayu kelas I
- M2 611,627.50 -
Membuat dan memasang pintu dan jendela kaca, kayu kelas II
- M2 1,080,942.50 -
Membuat dan memasang pintu dan jendela jalusi kayu kelas I
- M2 919,022.50 -
Membuat dan memasang pintu dan jendela jalusi kayu kelas II
- M2 #REF! #REF!
Membuat daun pintu kayu lapis (plywood) rangkap, rangka tertutup kayu kelas II (lebar sampai 90 cm)
- M2 #REF! #REF!
Membuat pintu plywood rangkap, rangka expose kayu kelas I
- M2 #REF! #REF!
Membuat pintu plywood rangkap, rangka expose kayu kelas II
- Memasang jalusi kusen, kayu kelas I M2 #REF! #REF!
- Memasang jalusi kusen, kayu kelas II M2 #REF! #REF!
- cm 1,188,158.15 -
Membuat pintu besi plat baja tebal 2 mm rangkap, rangka baja siku

- Membuat rangka jendela besi scuare tube (25 x 5) cm M2 161,452.53 -


- Memasang pintu rolling door besi M2 289,337.70 -
- Memasang pintu lipat (Folding door) bahan plastik/PVC M2 123,008.60 -
- Memasang rolling door alluminium M2 248,515.00 -
- Memasang kusen pintu alluminium M 97,445.42 -
- Memasang pintu alluminium strip lebar 8 cm M2 853,715.55 -
- Memasang pintu kaca rangka alluminium M2 29,877.58 -
- Memasang terali besi strip (2 x 3) mm M2 ### -
- Memasang kawat nyamuk M2 56,735.25 -
- Memasang jendela nako & tralis M2 #REF! #REF!

PEKERJAAN KUDA-KUDA, RANGKA ATAP DAN LISPLANK


- M3 10,629,105.00 -
Memasang konstruksi kuda-kuda konvensional, kayu kelas I bentang 6 meter
- M3 7,693,787.50 -
Memasang konstruksi kuda-kuda konvensional, kayu kelas II bentang 6 meter
- M3 5,606,537.50 -
Memasang konstruksi kuda-kuda konvensional, kayu kelas III bentang 6 meter
- Memasang konstruksi kuda-kuda expose, kayu kelas I M3 12,846,132.50 -
- Memasang rangka atap genteng keramik, kayu kelas II M2 113,643.00 -
- Memasang rangka atap genteng beton, kayu kelas II M2 129,582.00 -
- Memasang rangka atap sirap, kayu kelas II M2 #REF! #REF!
- Memasang lisplank ukuran (3 x 20) cm, kayu kelas I M 123,216.75 -
- Memasang lisplank ukuran (3 x 20) cm, kayu kelas II M 95,892.75 -
- Memasang lisplank ukuran (3 x 30) cm, kayu kelas I M 123,055.75 -
- Memasang lisplank ukuran (3 x 30) cm, kayu kelas II M 65,347.31 -
- Memasang Bubung Stel Gelombang 0,92 m M' 30,518.13 -
- Memasang Alluminium Foil / Sisalation M2 25,002.73 -
- Memasang besi profil kg 36,553.61 -
- Memasang rangka kuda-kuda baja IWF kg 37,393.40 -
- Memasang konstruksi gordeng, kayu kelas II M3 6,702,027.50 -
- Mengerjakan pekerjaan perakitan kg 37,805.68 -
- Mengerjakan pengelasan dengan las listrik M 28,919.63 -
- Memasang sunscreen alluminium M2 144,867.80 -
- Memasang venetions blinds dan Vertical blinds M2 97,929.98 -
- Memasang talang datar/ jurai seng bjls 28 lebar 90 cm M 158,915.63 -
- M #REF! #REF!
Memasang talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm
- Memasang Rangka Atap Baja Ringan M2 235,007.68 -

PEKERJAAN PENUTUP ATAP


- Memasang Atap Genteng Palentong Kecil M2 41,637.48 -
- Memasang Atap Genteng Kodok / Glazzur M2 29,348.00 -
- Memasang Atap Genteng Palentong Super / Besar M2 29,348.00 -
- Memasang Genteng Bubung Palentong M2 101,149.40 -
- Memasang Genteng Bubung Kodok Glazzur M2 101,149.40 -
- Memasang Genteng Bubung Palentong Besar M2 101,149.40 -
- Memasang Roof Light Fibreglass (180 x 90) cm M2 #REF! #REF!
- Memasang Atap Asbes Gelombang (2,50 x 0,92 m) x 5 mm M2 #REF! #REF!
- Memasang Atap Asbes Gelombang (2,25 x 0,92 m) x 5 mm M2 #REF! #REF!
- Memasang Atap Asbes Gelombang (2,00 x 0,92 m) x 5 mm M2 #REF! #REF!
- Memasang Atap Asbes Gelombang (1,80 x 0,92 m) x 5 mm M2 #REF! #REF!
- Memasang Atap Asbes Gelombang (3,00 x 1,05 m) x 4 mm M2 #REF! #REF!
- Memasang Atap Asbes Gelombang (2,70 x 1,05 m) x 4 mm M2 #REF! #REF!
- Memasang Atap Asbes Gelombang (2,40 x 1,05 m) x 4 mm M2 #REF! #REF!
- Memasang Atap Asbes Gelombang (2,10 x 1,05 m) x 4 mm M2 #REF! #REF!
- Memasang Atap Asbes Gelombang (1,5 x 1,05 m) x 4 mm M2 #REF! #REF!
- Memasang Atap Asbes Gelombang (3,0 x 1,08 m) x 6 mm M2 #REF! #REF!
- Memasang Atap Asbes Gelombang (2,70 x 1,08 m) x 6 mm M2 #REF! #REF!
- Memasang Atap Asbes Gelombang (2,10 x 1,08 m) x 6 mm M2 #REF! #REF!
- Memasang Atap Asbes Gelombang (2,10 x 1,08 m) x 6 mm M2 #REF! #REF!
- Memasang Atap Asbes Gelombang (1,80 x 1,08 m) x 6 mm M2 #REF! #REF!
- Memasang Atap Genteng Beton M2 #REF! #REF!
- Memasang Atap Genteng Aspal M2 #REF! #REF!
- Memasang Atap Genteng Metal M2 #REF! #REF!
- Memasang Atap Sirap M2 #REF! #REF!
- Memasang Atap Seng Gelombang M2 114,764.25 -
- Memasang Atap Nok Seng M' 47,942.93 -
- Memasang Atap Alluminium M2 194,439.70 -
- Memasang Nok Stel Gelombang 1,05 m M' 30,518.13 -
- Memasang Nok Stel Gelombang 1,08 m M' 30,518.13 -
- Memasang Nok Paten 0,92 m M' 30,518.13 -
- Memasang Nok Paten 1,05 m M' 30,518.13 -
- Memasang Nok Paten 1,08 m M' 30,518.13 -
- Memasang Nok Stel Rata 0,92 m M' 35,932.33 -
- Memasang Nok Stel Rata 1,05 m M' 35,932.33 -
- Memasang Nok Genteng Beton M' #REF! #REF!
- Memasang Nok Genteng Aspal M' #REF! #REF!
- Memasang Nok Genteng Metal M' #REF! #REF!
- Memasang Nok Sirap M' #REF! #REF!
- Memasang Nok Alluminium M2 188,485.00 -
PEKERJAAN KUNCI DAN KACA
- Memasang Kunci Tanam Antik Buah 424,900.85 -
- Memasang Kunci Tanam Biasa Buah 243,880.50 -
- Memasang Kunci Tanam Kamar Mandi Buah 243,045.60 -
- Memasang Kunci Silinder Buah 86,070.60 -
- Memasang Engsel Pintu Buah 130,670.94 -
- Memasang Engsel Jendela Kupu-Kupu Buah 46,858.48 -
- Memasang Engsel Angin Buah #REF! #REF!
- Memasang Spring Knip Buah #REF! #REF!
- Memasang Kait Angin Buah 36,404.98 -
- Memasang Door Closer Buah 90,624.60 -
- Memasang Kunci Selot Buah 59,303.20 -
- Memasang Door Holder Buah 90,624.60 -
- Memasang Door Stop Buah 18,848.50 -
- Memasang Rel Pintu Dorong Buah 108,650.85 -
- Memasang Kunci Lemari Buah #REF! #REF!
- Memasang Kaca, Tebal 3 mm M2 267,511.85 -
- Memasang Kaca, Tebal 5 mm M2 280,406.23 -
- Memasang Kaca, Tebal 8 mm M2 364,694.50 -
- Memasang Kaca Buram, Tebal 12 mm M2 1,024,453.06 -
- Memasang Kaca Cermin, Tebal 5 mm M2 28,354.98 -
- Memasang Kaca Cermin, Tebal 6 mm M2 4,392.71 -
- Memasang Kaca Cermin, Tebal 8 mm M2 8,756.96 -
- Memasang Kaca "Wireglass", Tebal 5 mm M2 28,354.98 -
- Memasang Kaca Patri, Tebal 5 mm M2 27,697.18 -
PEKERJAAN SANITASI
- Memasang Kloset Duduk / Monoblok Buah 5,709,836.25 -
- Memasang Kloset Jongkok Porselen Buah 530,857.25 -
- Memasang Kloset Jongkok Teraso Buah 389,602.75 -
- Memasang Urinoir Buah 2,166,611.50 -
- Memasang Wastafel Buah 1,614,952.13 -
- Memasang Bak Mandi Teraso Volume 0,30 M3 Buah 4,911,276.25 -
- Memasang Bak Mandi Fibreglass Volume 0,30 M3 Buah 1,069,799.00 -
- Memasang Bak Mandi Batu Bata Volume 0,30 M3 Buah 1,789,676.00 -
- Memasang Badkip Porselen Buah 7,429,531.88 -
- Membuat Bak Beton Volume 1 m3 Air Buah #REF! #REF!
- Memasang Bak Fibreglass Volume 1 m3 Air Buah 470,030.88 -
- M' 20,066.70 -
Memasang Pipa Penyalur Air Limbah Jenis Pipa Tanah, Diameter 15 Cm
- M' 94,530.00 -
Memasang Pipa Penyalur Air Limbah Jenis Pipa Tanah, Diameter 20 Cm
- Memasang Pipa Beton, Diameter 15 cm - 20 cm M' 59,258.47 -
- Memasang Pipa Beton, Diameter 30 cm - 100 cm M' 133,055.58 -
- Buah 1,312,403.58 -
Memasang Bak Kontrol Memasang Batu Bata Ukuran 30 x 30 Cm, Tinggi 35 Cm
- Buah 907,214.88 -
Memasang Bak Kontrol Pasangan Batu Bata Ukuran 45 x 45 Cm, Tinggi 50 Cm
- Buah 1,150,779.13 -
Memasang Bak Kontrol Pasangan Batu Bata Ukuran 60 x 60 Cm, Tinggi 65 Cm
- Memasang Pipa Galvanis Diameter 1/2" M' 25,217.78 -
- Memasang Pipa Galvanis Diameter 3/4" M' 25,217.78 -
- Memasang Pipa Galvanis Diameter 1" M' 25,217.78 -
- Memasang Pipa Galvanis Diameter 1 1/2" M' 42,377.50 -
- Memasang Pipa Galvanis Diameter 3" M' 103,487.93 -
- Memasang Pipa Galvanis Diameter 4" M' 53,095.21 -
- Memasang Tipe AW Diameter 1/2" M3 27,489.46 -
- Memasang Tipe AW Diameter 3/4" M' 26,207.87 -
- Memasang Tipe AW Diameter 1" M' 30,151.22 -
- Memasang Tipe AW Diameter 1 1/2" M' 49,071.59 -
- Memasang Tipe AW Diameter 2" M' 60,901.64 -
- Memasang Tipe AW Diameter 2 1/2" M' 83,284.96 -
- Memasang Tipe AW Diameter 3" M' 97,086.68 -
- Memasang Tipe AW Diameter 4" M' 140,479.98 -
- Memasang Bak Cuci Piring Stainless Steel Buah 423,861.25 -
- Memasang Bak Cuci Piring Teraso Buah 150,535.00 -
- Memasang Kran Diameter 3/4" Buah 88,147.50 -
- Memasang Kran Diameter 1/2" Buah 84,410.00
- Memasang Floor Drain Buah 133,963.50 -
PEKERJAAN LANGIT-LANGIT
- Memasang rangka langit-langit (50 x 100) cm, kayu kelas II M2 #REF! #REF!
- Memasang rangka langit-langit (50 x 100) cm, kayu kelas III M2 #REF! #REF!
- Memasang rangka langit-langit (60 x 60) cm, kayu kelas II M2 152,858.00 -
- Memasang rangka langit-langit (60 x 60) cm, kayu kelas III M2 #REF! #REF!
- Memasang langit-langit asbes semen, tebal 6 mm M2 15,894.73 -
- Memasang langit-langit asbes semen, tebal 5 mm M2 15,894.73 -
- Memasang langit-langit asbes semen, tebal 4 mm M2 15,894.73 -
- Memasang langit-langit akustik ukuran (30 x 30) cm M2 35,002.55 -
- Memasang langit-langit akustik ukuran (30 x 60) cm M2 29,411.25 -
- Memasang langit-langit akustik ukuran (60 x 120) cm M2 29,411.25 -
- M2 59,226.01 -
Memasang langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm dan 6 mm
- Memasang langit-langit lambriziring kayu, tebal 9 mm M2 328,305.45 -
- M2 64,913.48 -
Memasang langit-langit gypsum board ukuran (1200x2400x9) mm
- Memasang list plafond gysum profil M 54,723.90 -
- M2 413,212.25 -
Memasang langit-langit akustik ukuran (60 x 120) cm + rangka alluminium
- Memasang list langit-langit kayu profil M 39,935.48 -
PEKERJAAN PENGECATAN
1 - Mengikis / Mengerok Permukaan Cat Tembok Lama M2 21,423.35 -
2 - M2 16,535.85 -
Mencuci Bidang Permukaan Tembok yang pernah Di Cat
3 - M2 17,358.10 -
Mengerok Karat Cat Lama Permukaan Baja dengan Cara Manual
4 Menyabun Permukaan Tembok Lama M2 16,453.63 -
5 - M 2
#REF! #REF!

Mengerok Karat atau Cat Lama Permukaan Baja dengan Pancar Pasir (sanblasting) dengan tingkat Kebersihan Sa. 2 1/2
6 - Mendempul dan Menggosok Kayu M2 #REF! #REF!
7 - Mengecat Bidang Kayu Lama M2 43,271.26 -
8 - M2 52,296.66 -
Mengecat Bidang Kayu Baru (1 Lapis Plamir), 1 Lapis Cat Dasar 2 Lapis Cat Penutup
9 - M2 73,745.23 -
Mengecat Bidang Kayu Baru (1 Lapis Plamir), 1 Lapis Cat Dasar 3 Lapis Cat Penutup
###
- Melabur Bidang Kayu dengan Teak Oil M2 25,660.53 -
###
- Melabur Bidang Kayu dengan Politur M2 62,231.44 -
###
- Melabur Bidang Kayu dengan Cat Residu dan Ter M2 21,209.45 -
###
- Melabur Bidang Kayu dengan Vernis M2 57,079.45 -
###
- M2 27,088.08 -
Mengecat Tembok Baru (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 lapis Cat Penutup)
###
- M2 19,756.89 -
Mengecat Tembok Lama (1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
- Melabur Tembok dengan Kalkarium
### M2 10,472.94 -
- Melabur Tembok dengan Kapur Sirih
### M2 17,039.21 -
###
- M2 7,162.78 -
Melabur Tembok Lama dengan Kapur Sirih (Untuk Pemeliharaan)
- Memasang Wall Paper
### M2 #REF! #REF!
- Mengecat Permukaan Baja dengan Meni Besi
### M2 #REF! #REF!
###
- M2 91,345.94 -
Mengecat Permukaan Baja Dengan Meni Besi dan Perancah
###
- M2 50,371.44 -
Mengecat Permukaan Baja Lapis Seng (Galbani) secara Manual sistem 4 Lapis Cat
###
- M2 38,871.15 -
Mengecat Permukaan Baja Lapis Seng (Galbani) secara Manual sistem 1 Lapis Cat Mutakhir
###
- M2 342,205.50 -
Mengecat Permukaan Baja Lapis Seng (Galbani) secara Manual sistem 3 Lapis Cat Konvensional
###
- M2 163,351.75 -
Mengecat Permukaan Baja Lapis Seng (Galbani) secara Semprot (airless) dengan sistem 1 Lapis Cat Mutakhir
ANALISA HARGA SATUAN
PEKERJAAN PERSIAPAN

Pembuatan 1 m2 pagar sementara dari kayu tinggi 2 meter


Kode Harga Jumlah Harga
No Koefisien Satuan
Uraian Satuan satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.400 OH 88,000.000 35,200.00
Tukang Kayu L.02 0.200 OH 132,000.00 26,400.00
Kepala Tukang L.03 0.020 OH 159,500.00 3,190.00
Mandor L.04 0.020 OH 143,000.00 2,860.00
JUMLAH HARGA TENAGA 67,650.00
B BAHAN
Dolken dia. 8 - 10/400 cm 1.250 Batang 10.795 13.49
Portland semen (tonasa 50 kg) 5.000 Kg 1.52 7.60
Pasir Beton 0.005 m3 137.38 0.69
Kerikil Beton 0.009 m3 283.43
2,190,750 2.55
Kayu 5/7 klas II 0.072 m3 0
### 0.060 Kg #REF! #REF!
Residu 0.400 Liter 25,100.00 10,040.00
JUMLAH HARGA BAHAN #REF!
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) #REF!
E Overhead dan Provit 15 % #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meter


Kode Harga Jumlah Harga
No Koefisien Satuan
Uraian Satuan satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.2000 OH 88,000.000 17,600.00
Tukang Kayu L.02 0.4000 OH 132,000.00 52,800.00
Kepala Tukang L.03 0.020 OH 159,500.00 3,190.00
Mandor L.04 0.020 OH 143,000.00 2,860.00
JUMLAH HARGA TENAGA 76,450.00
B BAHAN
Dolken dia. 8 - 10/400 cm 1.250 Batang 10.80 13.49
Portland semen (tonasa 50 kg) 2.500 Kg 1,760.00 4,400.00
Seng Gelombang 3" - 5 " 1.200 Lbr 7,250.00 8,700.00
Pasir Beton 0.005 m3 275,000.00 1,375.00
Kerikil Beton 0.009 m3 425,000.00 3,825.00
Kayu 5/7 klas II 0.072 m3 3,850,000.00 277,200.00
### 0.060 Kg #REF! #REF!
### 0.450 Liter #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) #REF!
E Overhead dan Provit 15 % #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 meter


Kode Harga Jumlah Harga
No Koefisien Satuan
Uraian Satuan satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.2000 OH 88,000.00 17,600.00
Tukang Kayu L.02 0.3000 OH 132,000.00 39,600.00
Kepala Tukang L.03 0.020 OH 159,500.00 3,190.00
Mandor L.04 0.020 OH 143,000.00 2,860.00
JUMLAH HARGA TENAGA 63,250.00
B BAHAN
Dolken dia. 8 - 10/400 cm 1.000 Batang 10.80 10.80
Portland semen (tonasa 50 kg) 2.000 Kg 1,760.00 3,520.00
Kawat Duri 25.000 M’ 25,100.00 627,500.00
Pasir Beton 0.005 m3 275,000.00 1,375.00
Kerikil Beton 0.009 m3 425,000.00 3,825.00
### 0.060 Kg #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) #REF!
E Overhead dan Provit 15 % #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

Pengukuran dan pemasangan 1 m’ Bouwplank


Kode Harga Jumlah Harga
No Koefisien Satuan
Uraian Satuan satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.100 OH 88,000.00 8,800.00
Tukang Kayu L.02 0.100 OH 132,000.00 13,200.00
Kepala Tukang L.03 0.010 OH 159,500.00 1,595.00
Mandor L.04 0.005 OH 143,000.00 715.00
JUMLAH HARGA TENAGA 24,310.00
B BAHAN
Kayu 5/7 klas II 0.012 M3 3,850,000.00 46,200.00
### 0.020 Kg #REF! #REF!
Kayu papan 3/20 kayu klas II 0.007 M3 3,850,000.00 26,950.00
JUMLAH HARGA BAHAN #REF!
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) #REF!
E Overhead dan Provit 15 % #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

Pembuatan 1 m2 kantor sementara lantai plesteran


Kode Harga Jumlah Harga
No Koefisien Satuan
Uraian Satuan satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 2.000 OH 88,000.00 176,000.00
Tukang Kayu L.02 2.000 OH 132,000.00 264,000.00
Tukang Batu L.02 1.000 OH 132,000.00 132,000.00
Kepala Tukang L.03 0.300 OH 159,500.00 47,850.00
Mandor L.04 0.050 OH 143,000.00 7,150.00
JUMLAH HARGA TENAGA 627,000.00
B BAHAN
Dolken dia. 8 - 10/400 cm 1.250 Btg 10.80 13.49
Kayu papan 3/20 kayu klas II 0.180 M3 3,850,000.00 693,000.00
Baut Ø 22 mm 0.0800 Kg 25,000.00 2,000.00
Kawat Bidrat/ kawat beton 1.100 Kg 32,000.00 35,200.00
Portland semen (tonasa 50 kg) 35.000 Kg 1,760.00 61,600.00
Pasir Pasang 0.150 M3 275,000.00 41,250.00
Pasir Beton 0.100 M3 275,000.00 27,500.00
Kerikil Beton 0.150 M3 425,000.00 63,750.00
Batu Merah 30.000 Bh 1,200.00 36,000.00
Seng Plat, lebar 30 cm 0.250 Lbr 15,250.00 3,812.50
Jendela Nako 0.200 Bh - -
Kaca Polos 0.080 M2 198,000.00 15,840.00
Kunci Tanam 0.150 Bh 136,500.00 20,475.00
Plywood 4 mm 0.060 Lbr 75,000.00 4,500.00
JUMLAH HARGA BAHAN 1,004,940.99
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 1,631,940.99
E Overhead dan Provit 15 % 244,791.15
F Harga Satuan Pekerjaan (D+E) 1,876,732.14
Pembuatan 1 m2 gudang semen dan peralatan
Kode Harga Jumlah Harga
No Koefisien Satuan
Uraian Satuan satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 1.000 OH 88,000.00 88,000.00
Tukang Kayu L.02 2.000 OH 132,000.00 264,000.00
Kepala Tukang L.03 0.200 OH 159,500.00 31,900.00
Mandor L.04 0.050 OH 143,000.00 7,150.00
JUMLAH HARGA TENAGA 391,050.00
B BAHAN
Dolken dia. 8 - 10/400 cm 1.700 Btg 10.80 18.35
Kayu papan 3/20 kayu klas II 0.210 M3 3,850,000.00 808,500.00
Baut Ø 22 mm 0.300 Kg 25,000.00 7,500.00
Portland semen (tonasa 50 kg) 10.500 Kg 1,760.00 18,480.00
Pasir Beton 0.030 M3 275,000.00 8,250.00
Kerikil Beton 0.050 M3 425,000.00 21,250.00
Seng Gelombang 3' x 6" Bjls. 25 1.500 Lbr 112,000.00 168,000.00
Seng Plat, lebar 30 cm 0.250 Lbr 15,250.00 3,812.50
JUMLAH HARGA BAHAN 1,035,810.85
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 1,426,860.85
E Overhead dan Provit 15 % 214,029.13
F Harga Satuan Pekerjaan (D+E) 1,640,889.98

Pembuatan 1 m2 rumah jaga (konstruksi kayu)


Kode Harga Jumlah Harga
No Koefisien Satuan
Uraian Satuan satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 1.000 OH 88,000.00 88,000.00
Tukang Kayu L.02 1.500 OH 132,000.00 198,000.00
Kepala Tukang L.03 0.150 OH 159,500.00 23,925.00
Mandor L.04 0.050 OH 143,000.00 7,150.00
JUMLAH HARGA TENAGA 317,075.00
B BAHAN
Dolken dia. 8 - 10/400 cm 3.000 Btg 10.80 32.39
Kayu papan 3/20 kayu klas II 0.276 M3 3,850,000.00 1,062,600.00
Baut Ø 22 mm 0.700 Kg 25,000.00 17,500.00
Seng Gelombang 3' x 6" Bjls. 25 1.500 Lbr 112,000.00 168,000.00
JUMLAH HARGA BAHAN 1,248,132.39
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 1,565,207.39
E Overhead dan Provit 15 % 234,781.11
F Harga Satuan Pekerjaan (D+E) 1,799,988.49

1 m2Membersihkan Lapangan dan Perataan


Kode Harga Jumlah Harga
No Koefisien Satuan
Uraian Satuan satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.100 OH 88,000.00 8,800.00
Mandor L.04 0.050 OH 143,000.00 7,150.00
JUMLAH HARGA TENAGA 15,950.00
B BAHAN
-
-
JUMLAH HARGA BAHAN -
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 15,950.00
E Overhead dan Provit 15 % 2,392.50
F Harga Satuan Pekerjaan (D+E) 18,342.50

Pembuatan 1 m2 bedeng pekerja


Kode Harga Jumlah Harga
No Koefisien Satuan
Uraian Satuan satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 1.000 OH 95.250 95.25
Tukang Kayu L.02 2.000 OH 132,000.00 264,000.00
Kepala Tukang L.03 0.200 OH 159,500.00 31,900.00
Mandor L.04 0.050 OH 143,000.00 7,150.00
JUMLAH HARGA TENAGA 303,145.25
B BAHAN
Dolken dia. 8 - 10/400 cm 1.250 Btg 10.80 13.49
Kayu papan 3/20 kayu klas II 0.186 M3 3,850,000.00 716,100.00
Baut Ø 22 mm 0.300 Kg 25,000.00 7,500.00
Portland semen (tonasa 50 kg) 18.000 Kg 1,760.00 31,680.00
Pasir Beton 0.030 M3 275,000.00 8,250.00
Kerikil Beton 0.050 M3 425,000.00 21,250.00
Seng Gelombang 3' x 6" Bjls. 25 1.500 Lbr 112,000.00 168,000.00
Plywood 4 mm 1.350 Lbr 75,000.00 101,250.00
JUMLAH HARGA BAHAN 1,054,043.49
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 1,357,188.74
E Overhead dan Provit 15 % 203,578.31
F Harga Satuan Pekerjaan (D+E) 1,560,767.06
ANALISA HARGA SATUAN
PEKERJAAN TANAH

1 Menggali 1 m3 tanah cadas sedalam 1 meter


Kode Harga Jumlah
No Uraian Koefisien Satuan
Satuan satuan (Rp) Harga (Rp)
A TENAGA
Pekerja L.01 1.5 OH 88,000.00 132,000.00
Mandor L.04 0.06 OH 143,000.00 8,580.00
JUMLAH HARGA TENAGA 140,580.00
B BAHAN
-
-
JUMLAH HARGA BAHAN -
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 140,580.00
E Overhead dan Provit 15 % 21,087.00
F Harga Satuan Pekerjaan (D+E) 161,667.00

2 Pengurugan 1 m3 dengan pasir urug


Kode Harga Jumlah
No Uraian Koefisien Satuan
Satuan satuan (Rp) Harga (Rp)
A TENAGA
Pekerja L.01 0.3 OH 88,000.00 26,400.00
Mandor L.04 0.01 OH 143,000.00 1,430.00
-
JUMLAH HARGA TENAGA 27,830.00
B BAHAN
Pasir Urug 1.2 M3 230,000.00 276,000.00
-
JUMLAH HARGA BAHAN 276,000.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 303,830.00
E Overhead dan Provit 15 % 45,574.50
F Harga Satuan Pekerjaan (D+E) 349,404.50

3 Mengurug 1 m3 tanah didatangkan


Kode Harga Jumlah
No Uraian Koefisien Satuan
Satuan satuan (Rp) Harga (Rp)
A TENAGA
Pekerja 0.5 OH 88,000.00 44,000.00
Mandor 0.05 OH 143,000.00 7,150.00
JUMLAH HARGA TENAGA 51,150.00
B BAHAN
Tanah Timbunan Biasa 1.2 85,700.00 102,840.00
-
JUMLAH HARGA BAHAN 102,840.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 153,990.00
E Overhead dan Provit 15 % 23,098.50
F Harga Satuan Pekerjaan (D+E) 177,088.50
ANALISA HARGA SATUAN
PEKERJAAN PONDASI

1 Memasang 1 m3 pondasi batu belah, campuran 1 PC : 5 PP


Kode Harga Jumlah
No Uraian Koefisien Satuan
Satuan satuan (Rp) Harga (Rp)
A TENAGA
Pekerja L.01 1.5 OH 88,000.00 132,000.00
Tukang Batu L.02 0.75 OH 132,000.00 99,000.00
Kepala Tukang L.03 0.075 OH 159,500.00 11,962.50
Mandor L.04 0.075 OH 143,000.00 10,725.00
JUMLAH HARGA TENAGA 253,687.50
B BAHAN
Batu Gunung 1.2 M3 275,000.00 330,000.00
Portland semen (tonasa 50 kg) 136 Kg 1,760.00 239,360.00
Pasir Pasang 0.544 M3 275,000.00 149,600.00
JUMLAH HARGA BAHAN 718,960.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 972,647.50
E Overhead dan Provit 15 % 145,897.13
F Harga Satuan Pekerjaan (D+E) ###
ANALISA HARGA SATUAN
PEKERJAAN KAYU

1 Membuat dan memasang 1 m3 kusen pintu dan kusen jendela, kayu kelas
SNI 3434 : 2008
Kode Harga Jumlah
No Uraian Koefisien Satuan
Satuan satuan (Rp) Harga (Rp)
A TENAGA
Pekerja 6 OH 88,000 528,000.00
Tukang Kayu 18 OH 132,000 2,376,000.00
Kepala Tukang 1.8 OH 159,500 287,100.00
Mandor 0.3 OH 143,000 42,900.00
JUMLAH HARGA TENAGA ###
B BAHAN
Balok kayu kelas II 1.2 M3 3,850,000.00 4,620,000.00
Paku Campur 1.25 Kg 27,000 33,750.00
Lem Kayu (Fox) 1 Kg 27,500 27,500.00
JUMLAH HARGA BAHAN ###
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) ###
E Overhead dan Provit 15 % ###
F Harga Satuan Pekerjaan (D+E) ###

2 Membuat dan memasang 1 m2 daun pintu panel, kayu kelas II SNI 3434 : 2008
Kode Harga Jumlah
No Uraian Koefisien Satuan
Satuan satuan (Rp) Harga (Rp)
A TENAGA
Pekerja 1 OH 88,000 88,000.00
Tukang Kayu 3 OH 132,000 396,000.00
Kepala Tukang 0.3 OH 159,500 47,850.00
Mandor 0.05 OH 143,000 7,150.00
JUMLAH HARGA TENAGA 539,000.00
B BAHAN
Papan kayu kelas II 0.04 M3 3,850,000 154,000.00
Lem Kayu (Fox) 0.5 kg 27,500 13,750.00
JUMLAH HARGA BAHAN 167,750.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 706,750.00
E Overhead dan Provit 15 % 106,012.50
F Harga Satuan Pekerjaan (D+E) 812,762.50

76/98
ANALISA HARGA SATUAN
PEKERJAAN BESI DAN ALUMINIUM

1 Pemasangan 1 m2 rangka besi hollow Aluminium 20x40 mm, modul 60 x 60 cm


Kode Harga Jumlah Harga
No Uraian Koefisien Satuan
Satuan satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.25 OH 88,000.00 22,000.00
Tukang Besi Konstruksi L.02 0.25 OH 132,000.00 33,000.00
Kepala Tukang L.03 0.025 OH 159,500.00 3,987.50
Mandor L.04 0.013 OH 143,000.00 1,859.00
JUMLAH HARGA TENAGA 60,846.50
B BAHAN
hollow aluminium 20x40 mm 3.5 m’ 4,620.00 16,170.00
Aksesories 0.35 % 1,617.00 565.95
JUMLAH HARGA BAHAN 16,735.95
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 77,582.45
E Overhead dan Provit 15 % 11,637.37
F Harga Satuan Pekerjaan (D+E) 89,219.82

2 Pemasangan 1 m2 rangka gording besi hollow 40.40.2mm


Kode Harga Jumlah Harga
No Uraian Koefisien Satuan
Satuan satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.02 OH 88,000.00 1,760.00
Tukang Besi Konstruksi L.02 0.003 OH 132,000.00 396.00
Kepala Tukang L.03 0.006 OH 159,500.00 957.00
Mandor L.04 0.03 OH 143,000.00 4,290.00
JUMLAH HARGA TENAGA 7,403.00
B BAHAN
Besi hollow 40.40.2 mm 1.1 m’ 24,200.00 26,620.00
Assesoris rangka besi hollow 0.35 % 8,470.00 2,964.50
JUMLAH HARGA BAHAN 29,584.50
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 36,987.50
E Overhead dan Provit 15 % 5,548.13
F Harga Satuan Pekerjaan (D+E) 42,535.63
3 1 Kg Pemasangan Pipa Galvanis Ø 2,5" SNI 7393 : 2008
Kode Harga Jumlah Harga
No Uraian Koefisien Satuan
Satuan satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.02 OH 88,000.00 1,760.00
Tukang Las Biasa L.02 0.003 OH 132,000.00 396.00
Kepala Tukang L.03 0.006 OH 159,500.00 957.00
Mandor L.04 0.03 OH 143,000.00 4,290.00
JUMLAH HARGA TENAGA 7,403.00
B BAHAN
Pipa Galvanis Dia. 2,5" Medium B 1 Kg 27,000.00 27,000.00
Kawat Las elektroda 0.022 Kg 37,400.00 822.80
-
JUMLAH HARGA BAHAN 27,822.80
C PERALATAN
Mesin Las 0.022 jam 312,500.00 6,875.00
-
JUMLAH HARGA ALAT 6,875.00
D JUMLAH (A+B+C) 42,100.80
E Overhead dan Provit 15 % 6,315.12
F Harga Satuan Pekerjaan (D+E) 48,415.92

4 1 Kg Pemasangan Pelat Besi Buhul Baja SNI 7393 : 2008


Kode Harga Jumlah Harga
No Uraian Koefisien Satuan
Satuan satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.02 OH 88,000.00 1,760.00
Tukang Las Biasa L.02 0.003 OH 105,000.00 315.00
Kepala Tukang L.03 0.006 OH 159,500.00 957.00
Mandor L.04 0.03 OH 143,000.00 4,290.00
JUMLAH HARGA TENAGA 7,322.00
B BAHAN
Plat Besi Baja 1 Kg 16,365.00 16,365.00
KawatLas 0.022 Kg 37,400.00 822.80
-
JUMLAH HARGA BAHAN 17,187.80
C PERALATAN
Mesin Las 0.022 jam 312,500.00 6,875.00
-
JUMLAH HARGA ALAT 6,875.00
D JUMLAH (A+B+C) 31,384.80
E Overhead dan Provit 15 % 4,707.72
F Harga Satuan Pekerjaan (D+E) 36,092.52
ANALISA HARGA SATUAN
PEKERJAAN PENUTUP ATAP

1 Pemasangan1 m2 Pasang Atap Metal Spandek


Kode
Harga
No Uraian Satua Koefisien Satuan Jumlah Harga (Rp)
satuan (Rp)
n
A TENAGA
Pekerja 0.150 OH 88,000 13,200.00
Tukang Kayu 0.750 OH 132,000 99,000.00
Kepala Tukang 0.080 OH 159,500 12,760.00
Mandor 0.006 OH 143,000 858.00
JUMLAH HARGA TENAGA 125,818.00
B BAHAN
Atap Spandek 0,3 mm 1.300 M2 41,200 53,560.00
Sekrup Spandek 10.000 Bh 1,150 11,500.00
JUMLAH HARGA BAHAN 65,060.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 190,878.00
E Overhead dan Provit 15 % 28,631.70
F Harga Satuan Pekerjaan (D+E) 219,509.70

2 Pemasangan 1 M' Kalsiplank 9 mm,


Kode
Harga
No Uraian Satua Koefisien Satuan Jumlah Harga (Rp)
satuan (Rp)
n
A TENAGA
Pekerja 0.100 OH 88,000 8,800.00
Tukang Kayu 0.200 OH 132,000 26,400.00
Kepala Tukang 0.020 OH 159,500 3,190.00
Mandor 0.005 OH 143,000 715.00
JUMLAH HARGA TENAGA 39,105.00
B BAHAN
Kalsiplank 9 mm 1.000 M1 45,000 45,000.00
Paku Plafond 0.100 Kg 38,500 3,850.00
JUMLAH HARGA BAHAN 48,850.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 87,955.00
E Overhead dan Provit 15 % 13,193.25
F Harga Satuan Pekerjaan (D+E) 101,148.25
ANALISA HARGA SATUAN
PEKERJAAN BETON

1 Membuat 1 m3 sloof beton bertulang (150 kg besi + bekisting)


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 5.65 OH 88,000.00 497,200.00
Tukang Batu L.02 0.275 OH 132,000.00 36,300.00
Tukang Kayu L.02 1.56 OH 132,000.00 205,920.00
Tukang Besi Konstruksi L.02 1.4 OH 132,000.00 184,800.00
Kepala Tukang L.03 0.323 OH 159,500.00 51,518.50
Mandor L.04 0.283 OH 143,000.00 40,469.00
JUMLAH HARGA TENAGA 1,016,207.50
B BAHAN
Papan kayu kelas II 0.27 m3 3,850,000.00 1,039,500.00
Paku Campur 2 kg 27,000.00 54,000.00
Minyak Bekisting 0 Liter 16,500.00 -
besi beton polos 150 kg 14,000.00 2,100,000.00
Kawat Bidrat/ kawat beton 3 kg 32,000.00 96,000.00
Portland semen (tonasa 50 kg) 336 kg 1,760.00 591,360.00
Pasir Beton 0.54 m3 275,000.00 148,500.00
Kerikil Beton 0.81 m3 425,000.00 344,250.00
JUMLAH HARGA BAHAN 4,373,610.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 5,389,817.50
E Overhead dan Provit 15 % 808,472.63
F Harga Satuan Pekerjaan (D+E) 6,198,290.13

Membuat 1 m3 pondasi beton bertulang (150 kg besi + bekisting)


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 5.3 OH 88,000.00 466,400.00
Tukang Batu L.02 0.275 OH 132,000.00 36,300.00
Tukang Kayu L.02 1.3 OH 132,000.00 171,600.00
Tukang Besi Konstruksi L.02 1.05 OH 132,000.00 138,600.00
Kepala Tukang L.03 0.262 OH 159,500.00 41,789.00
Mandor L.04 0.265 OH 143,000.00 37,895.00
JUMLAH HARGA TENAGA 892,584.00
B BAHAN
Kayu Papan Bekisting 0.2 m3 1,980,000.00 396,000.00
Paku Campur 1.5 kg 27,000.00 40,500.00
Minyak Bekisting 0.4 Liter 16,500.00 6,600.00
Besi Beton 157.5 kg 14,000.00 2,205,000.00
Kawat Beton 2.25 kg 32,000.00 72,000.00
Portland sement 336 kg 1,760.00 591,360.00
Pasir Beton 0.54 m3 275,000.00 148,500.00
Kerikil Beton 0.81 m3 425,000.00 344,250.00
JUMLAH HARGA BAHAN 3,804,210.00
C PERALATAN

-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 4,696,794.00
E Overhead dan Provit 15 % 704,519.10
F Harga Satuan Pekerjaan (D+E) 5,401,313.10

80/98
Membuat 1 m3 kolom beton bertulang + bekisting
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 5.3 OH 88,000.00 466,400.00
Tukang Batu L.02 0.275 OH 132,000.00 36,300.00
Tukang Kayu L.02 1.3 OH 132,000.00 171,600.00
Tukang Besi Konstruksi L.02 1.05 OH 132,000.00 138,600.00
Kepala Tukang L.03 0.027 OH 159,500.00 4,306.50
Mandor L.04 0.027 OH 143,000.00 3,861.00
JUMLAH HARGA TENAGA 821,067.50
B BAHAN
Kayu Papan Bekisting 0.32 m3 1,980,000.00 633,600.00
Paku Campur 3.20 kg 27,000.00 86,400.00
Besi Baton Polos 70.91 kg 14,000.00 992,783.16
Kawat Beton 2.25 kg 32,000.00 72,000.00
Semen Portland 336.00 kg 1,760.00 591,360.00
Pasir Beton 0.54 m3 275,000.00 148,500.00
Kerikil Beton 0.81 m3 425,000.00 344,250.00
Balok Kayu Kelas III 0.12 m3 2,200,000.00 264,000.00
Dolken 32.00 Batang 9,587.00 306,784.00
JUMLAH HARGA BAHAN 3,439,677.16
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 4260744.65733333
E Overhead dan Provit 15 % 639,111.70
F Harga Satuan Pekerjaan (D+E) 4,899,856.36

81/98
ANALISA HARGA SATUAN
PEKERJAAN PENUTUP LANTAI DAN DINDING

1 Memasang 1 m2 batu Sikat (koral)


Harga
Kode Jumlah Harga
No Uraian KoefisienSatuan satuan
Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 0.7 OH 88,000.00 61,600.00
Tukang L.02 0.35 OH ### 46,200.00
Kepala Tukang L.03 0.035 OH ### 5,582.50
Mandor L.04 0.035 OH ### 5,005.00
JUMLAH HARGA TENAGA 118,387.50
B BAHAN
Batu Koral (Sika Lokal) 1.1 M2 ### 175,450.00
portland semen 11.75 Kg 1,760.00 20,680.00
Pasir Pasang 0.035 M3 ### 9,625.00
JUMLAH HARGA BAHAN 205,755.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 324,142.50
E Overhead dan Provit 15 % 48,621.38
F Harga Satuan Pekerjaan (D+E) 372,763.88
ANALISA HARGA SATUAN
PEKERJAAN DINDING

1 Memasang 1 m2 dinding trassram bata merah tebal ½ bata, campuran spesi 1 PC : 2 PP


Kode Harga Jumlah
No Uraian Koefisien Satuan
Satuan satuan (Rp) Harga (Rp)
A TENAGA
Pekerja L.01 0.3 OH 88,000.00 26,400.00
Tukang Batu L.02 0.1 OH 132,000.00 13,200.00
Kepala Tukang L.03 0.01 OH 159,500.00 1,595.00
Mandor L.04 0.015 OH 143,000.00 2,145.00
JUMLAH HARGA TENAGA 43,340.00
B BAHAN
Batu Merah 70 Bh 1,200.00 84,000.00
Portland semen (tonasa 50 kg) 18.95 Kg 1,760.00 33,352.00
Pasir Pasang 0.038 M3 275,000.00 10,450.00
JUMLAH HARGA BAHAN 127,802.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 171,142.00
E Overhead dan Provit 15 % 25,671.30
F Harga Satuan Pekerjaan (D+E) 196,813.30

2 Memasang 1 m2 dinding bata merah tebal ½ bata, campuran spesi 1 PC : 5 PP


Kode Harga Jumlah
No Uraian Koefisien Satuan
Satuan satuan (Rp) Harga (Rp)
A TENAGA
Pekerja L.01 0.3 OH 88,000.00 26,400.00
Tukang Batu L.02 0.1 OH 132,000.00 13,200.00
Kepala Tukang L.03 0.01 OH 159,500.00 1,595.00
Mandor L.04 0.015 OH 143,000.00 2,145.00
JUMLAH HARGA TENAGA 43,340.00
B BAHAN
Batu Merah 70 Bh 1,200.00 84,000.00
Portland semen (tonasa 50 kg) 9.68 Kg 1,760.00 17,036.80
Pasir Pasang 0.045 M3 275,000.00 12,375.00
JUMLAH HARGA BAHAN 113,411.80
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 156,751.80
E Overhead dan Provit 15 % 23,512.77
F Harga Satuan Pekerjaan (D+E) 180,264.57
ANALISA HARGA SATUAN
PEKERJAAN KUNCI DAN KACA

1 1 Buah Pasang Engsel Pintu


Kode Harga Jumlah
No Uraian Koefisien Satuan
Satuan satuan (Rp) Harga (Rp)
A TENAGA
Pekerja 0.015 OH 88,000 1,320.00
Tukang Kayu 0.150 OH 132,000 19,800.00
Kepala Tukang 0.015 OH 159,500 2,392.50
Mandor 0.0008 OH 143,000 114.40
JUMLAH HARGA TENAGA 23,626.90
B BAHAN
Engsel Pintu (ex. Boss) 1.000 Bh 90,000 90,000.00
-
JUMLAH HARGA BAHAN 90,000.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 113,626.90
E Overhead dan Provit 15 % 17,044.04
F Harga Satuan Pekerjaan (D+E) 130,670.94

2 1 M2 Pasang Kaca Bening, Tebal 5 mm


Kode Harga Jumlah
No Uraian Koefisien Satuan
Satuan satuan (Rp) Harga (Rp)
A TENAGA
Pekerja 0.015 OH 88,000 1,320.00
Tukang Kayu 0.150 OH 132,000 19,800.00
Kepala Tukang 0.015 OH 159,500 2,392.50
Mandor 0.008 OH 143,000 1,144.00
JUMLAH HARGA TENAGA 24,656.50
B BAHAN
Kaca Bening, Tebal 5 mm 1.100 M2 198,000 217,800.00
Sealant 0.05 kg 27,500 1,375.00
JUMLAH HARGA BAHAN 219,175.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 243,831.50
E Overhead dan Provit 15 % 36,574.73
F Harga Satuan Pekerjaan (D+E) 280,406.23
3 1 Buah Pasang Kunci Tanam Pintu
Kode Harga Jumlah
No Uraian Koefisien Satuan
Satuan satuan (Rp) Harga (Rp)
A TENAGA
Pekerja 0.020 OH 88,000 1,760.00
Tukang Kayu 0.200 OH 132,000 26,400.00
Kepala Tukang 0.020 OH 159,500 3,190.00
Mandor 0.001 OH 143,000 143.00
JUMLAH HARGA TENAGA 31,493.00
B BAHAN
Kunci Tanam (Ex. Steel) 1.000 Bh 275,000 275,000.00
-
JUMLAH HARGA BAHAN 275,000.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 306,493.00
E Overhead dan Provit 15 % 45,973.95
F Harga Satuan Pekerjaan (D+E) 352,466.95
ANALISA HARGA SATUAN
PEKERJAAN PLESTERAN

1 Memasang 1 m2 plesteran 1 PC : 5 PP, tebal 15 mm


Kode Harga Jumlah
No Uraian Koefisien Satuan
Satuan satuan (Rp) Harga (Rp)
A TENAGA
Pekerja L.01 0.3 OH 88,000.00 26,400.00
Tukang Batu L.02 0.15 OH 132,000.00 19,800.00
Kepala Tukang L.03 0.015 OH 159,500.00 2,392.50
Mandor L.04 0.015 OH 143,000.00 2,145.00
JUMLAH HARGA TENAGA 50,737.50
B BAHAN
Portland semen (tonasa 50 kg) 5.184 Kg 1,760.00 9,123.84
Pasir Pasang 0.026 M3 275,000.00 7,150.00
JUMLAH HARGA BAHAN 16,273.84
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 67,011.34
E Overhead dan Provit 15 % 10,051.70
F Harga Satuan Pekerjaan (D+E) 77,063.04

2 Memasang 1 m2 acian
Kode Harga Jumlah
No Uraian Koefisien Satuan
Satuan satuan (Rp) Harga (Rp)
A TENAGA
Pekerja L.01 0.100 OH 88,000.00 8,800.00
Tukang Batu L.02 0.050 OH 132,000.00 6,600.00
Kepala Tukang L.03 0.005 OH 159,500.00 797.50
Mandor L.04 0.005 OH 143,000.00 715.00
JUMLAH HARGA TENAGA 16,912.50
B BAHAN
Portland semen (tonasa 50 kg) 3.25 kg 1,760.00 5,720.00
-
JUMLAH HARGA BAHAN 5,720.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 22,632.50
E Overhead dan Provit 15 % 3,394.88
F Harga Satuan Pekerjaan (D+E) 26,027.38

86/98
ANALISA HARGA SATUAN
PEKERJAAN LANGIT-LANGIT

1 Memasang 1 m2 langit-langit gypsum board ukuran (1200x2400x9) mm


Kode Harga Jumlah
No Uraian Koefisien Satuan
Satuan satuan (Rp) Harga (Rp)
A TENAGA
Pekerja 0.1 OH 88,000.00 8,800.00
Tukang Kayu 0.05 OH 132,000.00 6,600.00
Kepala Tukang 0.005 OH 159,500.00 797.50
Mandor 0.005 OH 143,000.00 715.00
JUMLAH HARGA TENAGA 16,912.50
B BAHAN
Gypsum Board (120x240x9) mm 0.364 Lembar 93,500.00 34,034.00
Paku Sekrup Gypsumpboard 0.11 kg 50,000.00 5,500.00
JUMLAH HARGA BAHAN 39,534.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 56,446.50
E Overhead dan Provit 15 % 8,466.98
F Harga Satuan Pekerjaan (D+E) 64,913.48

2 Memasang 1 m’ list plafond gypsum profil


Kode Harga Jumlah
No Uraian Koefisien Satuan
Satuan satuan (Rp) Harga (Rp)
A TENAGA
Pekerja 0.06 OH 88,000.00 5,280.00
Tukang Kayu 0.06 OH 132,000.00 7,920.00
Kepala Tukang 0.006 OH 159,500.00 957.00
Mandor 0.003 OH 143,000.00 429.00
JUMLAH HARGA TENAGA 14,586.00
B BAHAN
List gypsum profil 10/10 cm 1.05 m’ 30,000.00 31,500.00
Tepung gypsum 0.15 kg 10,000.00 1,500.00
JUMLAH HARGA BAHAN 33,000.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 47,586.00
E Overhead dan Provit 15 % 7,137.90
F Harga Satuan Pekerjaan (D+E) 54,723.90
ANALISA HARGA SATUAN
PEKERJAAN PENGECATAN

1 1 m2 Pengecatan Tembok/Beton
Kode Harga Jumlah Harga
No Uraian Koefisien Satuan
Satuan satuan (Rp) (Rp)
A TENAGA
Pekerja 0.015 OH 88,000 1,320.00
Tukang Cat 0.050 OH 132,000 6,600.00
Kepala Tukang 0.005 OH 159,500 797.50
Mandor 0.002 OH 143,000 286.00
JUMLAH HARGA TENAGA 9,003.50
B BAHAN
Cat Dasar (Ex. Jotun Ultra Primer) 0.100 Kg 80,000 8,000.00
Cat Penutup (Ex. Jotun Jotashield Extreme 0.260 Kg 110,000 28,600.00
JUMLAH HARGA BAHAN 36,600.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 45,603.50
E Overhead dan Provit 15 % 6,840.53
F Harga Satuan Pekerjaan (D+E) 52,444.03
PEKERJAAN PENUTUP ATAP
6.30. 1 m2 Pasang Atap Genteng Beton SNI 03-3436-1994
Kode Harga Jumlah
No KoefisienSatuan
Uraian Satuan satuan (Rp) Harga (Rp)
A TENAGA
Pekerja 0.200 OH 88,000 17,600.00
Tukang Kayu 0.100 OH 132,000 13,200.00
Kepala Tukang 0.010 OH 159,500 1,595.00
Mandor 0.010 OH 143,000 1,430.00
JUMLAH HARGA TENAGA 33,825.00
B BAHAN
Genteng Beton ### Bh 15,750 173,250.00
### 0.030 Bh #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) #REF!
E Overhead dan Provit 15 % #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

6.32. 1 m2 Pasang Atap Genteng Metal SNI 03-3436-1994


Kode Harga Jumlah
No KoefisienSatuan
Uraian Satuan satuan (Rp) Harga (Rp)
A TENAGA
Pekerja 0.200 OH 88,000 17,600.00
Tukang Kayu 0.100 OH 132,000 13,200.00
Kepala Tukang 0.010 OH 159,500 1,595.00
Mandor 0.001 OH 143,000 143.00
JUMLAH HARGA TENAGA 32,538.00
B BAHAN
Genteng Metal Roof 1.480 Lbr 40,300 59,644.00
### 0.200 Kg #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) #REF!
E Overhead dan Provit 15 % #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

6.34. 1 m' Pasang Nok Genteng Beton SNI 03-3436-1994


Kode Harga Jumlah
No KoefisienSatuan
Uraian Satuan satuan (Rp) Harga (Rp)
A TENAGA
Pekerja 0.400 OH 88,000 35,200.00
Tukang Kayu 0.200 OH 132,000 26,400.00
Kepala Tukang 0.020 OH 159,500 3,190.00
Mandor 0.020 OH 143,000 2,860.00
JUMLAH HARGA TENAGA 67,650.00
B BAHAN
Nok Genteng Beton 3.500 Bh 18,375 64,312.50
### 0.050 Kg #REF! #REF!
Semen Abu-abu ### Kg 2,450 26,460.00
Pasir Pasang 0.032 M3 275,000 8,800.00
Semen Warna 1.000 Kg 22,000 22,000.00
JUMLAH HARGA BAHAN #REF!
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) #REF!
E Overhead dan Provit 15 % #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

6.36. 1 m' Pasang Nok Genteng Metal SNI 03-3436-1994


Kode Harga Jumlah
No KoefisienSatuan
Uraian Satuan satuan (Rp) Harga (Rp)
A TENAGA
Pekerja 0.250 OH 88,000 22,000.00
Tukang Kayu 0.150 OH 132,000 19,800.00
Kepala Tukang 0.015 OH 159,500 2,392.50
Mandor 0.013 OH 143,000 1,859.00
JUMLAH HARGA TENAGA 46,051.50
B BAHAN
Nok Metal Roof 1.100 Bh 33,150 36,465.00
ANALISA HARGA SATUAN
PEKERJAAN SANITASI

1 Memasang 1 Buah Kloset Duduk / Monoblok RSNIT 15-2002


Kode Harga Jumlah Harga
No Koefisien Satuan
Uraian Satuan satuan (Rp) (Rp)
A TENAGA
Pekerja 3.300 OH 88,000 290,400.00
Tukang Batu 1.100 OH 132,000 145,200.00
Kepala Tukang 0.010 OH 159,500 1,595.00
Mandor 0.1600 OH 143,000 22,880.00
JUMLAH HARGA TENAGA 460,075.00
B BAHAN
Kloset Duduk + jetwasher (lengkap 1 set) ex 1.000 Bh 4,250,000 4,250,000.00
Perlengkapan 6% x Harga Kloset 255,000.00
JUMLAH HARGA BAHAN 4,505,000.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 4,965,075.00
E Overhead dan Provit 15 % 744,761.25
F Harga Satuan Pekerjaan (D+E) 5,709,836.25

2 Memasang 1 Buah Kloset Jongkok Porselen RSNIT 15-2002


Kode Harga Jumlah Harga
No Koefisien Satuan
Uraian Satuan satuan (Rp) (Rp)
A TENAGA
Pekerja 1.000 OH 88,000 88,000.00
Tukang Batu 1.500 OH 132,000 198,000.00
Kepala Tukang 0.150 OH 159,500 23,925.00
Mandor 0.1600 OH 143,000 22,880.00
JUMLAH HARGA TENAGA 332,805.00
B BAHAN
Kloset Jongkok Porselen 1.000 Bh 115,500 115,500.00
Portland semen (tonasa 50 kg) 6.000 Kg 1,760 10,560.00
Pasir Pasang 0.010 M3 275,000 2,750.00
JUMLAH HARGA BAHAN 128,810.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 461,615.00
E Overhead dan Provit 15 % 69,242.25
F Harga Satuan Pekerjaan (D+E) 530,857.25

3 Memasang 1 Buah Kloset Jongkok Teraso RSNIT 15-2002


Kode Harga Jumlah Harga
No Koefisien Satuan
Uraian Satuan satuan (Rp) (Rp)
A TENAGA
Pekerja 1.000 OH 88,000 88,000.00
Tukang Batu 1.500 OH 132,000 198,000.00
Kepala Tukang 0.150 OH 159,500 23,925.00
Mandor 0.050 OH 143,000 7,150.00
JUMLAH HARGA TENAGA 317,075.00
B BAHAN
Kloset Jongkok Teraso 1.000 Bh - -
Batu Merah 7.000 Bh 1,200 8,400.00
Portland semen (tonasa 50 kg) 6.000 Kg 1,760 10,560.00
Pasir Pasang 0.010 M3 275,000 2,750.00
JUMLAH HARGA BAHAN 21,710.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 338,785.00
E Overhead dan Provit 15 % 50,817.75
F Harga Satuan Pekerjaan (D+E) 389,602.75

4 Memasang 1 Buah Urinoir RSNIT 15-2002


Kode Harga Jumlah Harga
No Koefisien Satuan
Uraian Satuan satuan (Rp) (Rp)
A TENAGA
Pekerja 1.000 OH 88,000 88,000.00
Tukang Batu 1.000 OH 132,000 132,000.00
Kepala Tukang 0.100 OH 159,500 15,950.00
Mandor 0.050 OH 143,000 7,150.00
JUMLAH HARGA TENAGA 243,100.00
B BAHAN
Urinoir 1.000 Bh 1,252,000 1,252,000.00
Perlengkapan 30% x Harga Urinoir 375,600.00
Portland semen (tonasa 50 kg) 6.000 Kg 1,760 10,560.00
Pasir Pasang 0.010 M3 275,000 2,750.00
JUMLAH HARGA BAHAN 1,640,910.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 1,884,010.00
E Overhead dan Provit 15 % 282,601.50
F Harga Satuan Pekerjaan (D+E) 2,166,611.50

3 Memasang 1 Buah Wastafel RSNIT 15-2002


Kode Harga Jumlah Harga
No Koefisien Satuan
Uraian Satuan satuan (Rp) (Rp)
A TENAGA
Pekerja 1.200 OH 88,000 105,600.00
Tukang Batu 1.450 OH 132,000 191,400.00
Kepala Tukang 0.150 OH 159,500 23,925.00
Mandor 0.060 OH 143,000 8,580.00
JUMLAH HARGA TENAGA 329,505.00
B BAHAN
Wastafel Standar 1.200 Bh 789,800 947,760.00
Perlengkapan 12% x Harga Wastafel 113,731.20
Portland semen (tonasa 50 kg) 6.000 Kg 1,760 10,560.00
Pasir Pasang 0.010 M3 275,000 2,750.00
JUMLAH HARGA BAHAN 1,074,801.20
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 1,404,306.20
E Overhead dan Provit 15 % 210,645.93
F Harga Satuan Pekerjaan (D+E) 1,614,952.13

4 Memasang 1 Buah Badkip Porselen RSNIT 15-2002


Kode Harga Jumlah Harga
No Koefisien Satuan
Uraian Satuan satuan (Rp) (Rp)
A TENAGA
Pekerja 0.075 OH 88,000 6,600.00
Tukang Batu 0.750 OH 132,000 99,000.00
Kepala Tukang 0.075 OH 159,500 11,962.50
Mandor 0.300 OH 143,000 42,900.00
JUMLAH HARGA TENAGA 160,462.50
B BAHAN
Badkip ex. Toto lengkap 1.000 Unit 5,250,000 5,250,000.00
Perlengkapan 20% x Harga Badkip 1,050,000.00
JUMLAH HARGA BAHAN 6,300,000.00
C PERALATAN
- -
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 6,460,462.50
E Overhead dan Provit 15 % 969,069.38
F Harga Satuan Pekerjaan (D+E) 7,429,531.88

5 Memasang 1 Buah Bak Mandi Fibreglass Volume 0,30 M3 RSNIT 15-2002


Kode Harga Jumlah Harga
No Koefisien Satuan
Uraian Satuan satuan (Rp) (Rp)
A TENAGA
Pekerja 1.800 OH 88,000 158,400.00
Tukang Batu 2.700 OH 132,000 356,400.00
Kepala Tukang 0.540 OH 159,500 86,130.00
Mandor 0.110 OH 143,000 15,730.00
JUMLAH HARGA TENAGA 616,660.00
B BAHAN
Bak Fibreglass 1.000 Bh 280,000 280,000.00
Perlengkapan 12% x Harga Bak 33,600.00
JUMLAH HARGA BAHAN 313,600.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 930,260.00
E Overhead dan Provit 15 % 139,539.00
F Harga Satuan Pekerjaan (D+E) 1,069,799.00

8 Memasang 1 Buah Bak Mandi Batu Bata Volume 0,30 M3 RSNIT 15-2002
Kode Harga Jumlah Harga
No Koefisien Satuan
Uraian Satuan satuan (Rp) (Rp)
A TENAGA
Pekerja 6.000 OH 88,000 528,000.00
Tukang Batu 3.000 OH 132,000 396,000.00
Kepala Tukang 0.300 OH 159,500 47,850.00
Mandor 0.030 OH 143,000 4,290.00
JUMLAH HARGA TENAGA 976,140.00
B BAHAN
Batu Merah 150.000 Bh 1,200 180,000.00
Portland semen (tonasa 50 kg) 120.000 Kg 1,760 211,200.00
Pasir Pasang 0.300 M3 275,000 82,500.00
Keramik Warna 20 x 20 cm 25.000 Bh 3,800 95,000.00
Semen Nat 6.000 Kg 1,900 11,400.00
JUMLAH HARGA BAHAN 580,100.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 1,556,240.00
E Overhead dan Provit 15 % 233,436.00
F Harga Satuan Pekerjaan (D+E) 1,789,676.00

9 Memasang 1 Buah Bak Mandi Teraso Volume 0,30 M3 RSNIT 15-2002


Kode Harga Jumlah Harga
No Koefisien Satuan
Uraian Satuan satuan (Rp) (Rp)
A TENAGA
Pekerja 3.000 OH 88,000 264,000.00
Tukang Batu 4.500 OH 132,000 594,000.00
Kepala Tukang 0.050 OH 159,500 7,975.00
Mandor 0.900 OH 143,000 128,700.00
JUMLAH HARGA TENAGA 994,675.00
B BAHAN
Washtafel Ex toto (lengkap)+kran 1.000 Bh 2,925,000 2,925,000.00
Perlengkapan 12% x Harga bak teraso 351,000.00
JUMLAH HARGA BAHAN 3,276,000.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 4,270,675.00
E Overhead dan Provit 15 % 640,601.25
F Harga Satuan Pekerjaan (D+E) 4,911,276.25

10 Memasang 1 Buah Bak Fibreglass Volume 1 m3 Air RSNIT 15-2002


Kode Harga Jumlah Harga
No Koefisien Satuan
Uraian Satuan satuan (Rp) (Rp)
A TENAGA
Pekerja 0.300 OH 88,000 26,400.00
Tukang Batu 0.450 OH 132,000 59,400.00
Kepala Tukang 0.045 OH 159,500 7,177.50
Mandor 0.015 OH 143,000 2,145.00
JUMLAH HARGA TENAGA 95,122.50
B BAHAN
Bak Fibreglass 1.000 Bh 280,000 280,000.00
Perlengkapan 12% x Harga Bak 33,600.00
-
JUMLAH HARGA BAHAN 313,600.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 408,722.50
E Overhead dan Provit 15 % 61,308.38
F Harga Satuan Pekerjaan (D+E) 470,030.88

11 Membuat 1 Buah Bak Beton Volume 1 m3 Air RSNIT 15-2002


Kode Harga Jumlah Harga
No Koefisien Satuan
Uraian Satuan satuan (Rp) (Rp)
A TENAGA
Pekerja 3.500 OH 88,000 308,000.00
Tukang Batu 4.500 OH 132,000 594,000.00
Kepala Tukang 0.050 OH 159,500 7,975.00
Mandor 0.180 OH 143,000 25,740.00
JUMLAH HARGA TENAGA 935,715.00
B BAHAN
Beton 1 : 1 1/2 : 2 1/2 0.900 M3 - -
Besi Beton Ulir 180.000 Kg 24,200 4,356,000.00
### 8.000 M3 #REF! #REF!
Perlengkapan 10% x Harga Beton -
Ubin Porselen 5.000 M2 - -
JUMLAH HARGA BAHAN #REF!
C PERALATAN
- -
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) #REF!
E Overhead dan Provit 15 % #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

12 Memasang 1 Buah Bak Cuci Piring Stainless Steel RSNIT 15-2002


Kode Harga Jumlah Harga
No Koefisien Satuan
Uraian Satuan satuan (Rp) (Rp)
A TENAGA
Pekerja 0.030 OH 88,000 2,640.00
Tukang Batu 0.300 OH 132,000 39,600.00
Kepala Tukang 0.030 OH 159,500 4,785.00
Mandor 0.015 OH 143,000 2,145.00
JUMLAH HARGA TENAGA 49,170.00
B BAHAN
Bak Cuci Stainless Steel 1 lubang 1.000 Bh 319,405 319,405.00
Water Drain + Acsesories 1.000 Set - -
JUMLAH HARGA BAHAN 319,405.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 368,575.00
E Overhead dan Provit 15 % 55,286.25
F Harga Satuan Pekerjaan (D+E) 423,861.25

13 Memasang 1 Buah Bak Cuci Piring Teraso RSNIT 15-2002


Kode Harga Jumlah Harga
No Koefisien Satuan
Uraian Satuan satuan (Rp) (Rp)
A TENAGA
Pekerja 0.050 OH 88,000 4,400.00
Tukang Batu 0.500 OH 132,000 66,000.00
Kepala Tukang 0.050 OH 159,500 7,975.00
Mandor 0.025 OH 143,000 3,575.00
JUMLAH HARGA TENAGA 81,950.00
B BAHAN
Bak Cuci Teraso 1.000 Bh - -
Water Drain + Acsesories 1.000 Bh - -
Portland semen (tonasa 50 kg) 20.000 Kg 1,760 35,200.00
Pasir Pasang 0.050 M3 275,000 13,750.00
JUMLAH HARGA BAHAN 48,950.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 130,900.00
E Overhead dan Provit 15 % 19,635.00
F Harga Satuan Pekerjaan (D+E) 150,535.00

14 Memasang 1 Buah Floor Drain RSNIT 15-2002


Kode Harga Jumlah Harga
No Koefisien Satuan
Uraian Satuan satuan (Rp) (Rp)
A TENAGA
Pekerja 0.010 OH 88,000 880.00
Tukang Batu 0.100 OH 132,000 13,200.00
Kepala Tukang 0.010 OH 159,500 1,595.00
Mandor 0.005 OH 143,000 715.00
JUMLAH HARGA TENAGA 16,390.00
B BAHAN
Floor Drain stainlesteel 1.000 Bh 100,100 100,100.00
-
JUMLAH HARGA BAHAN 100,100.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 116,490.00
E Overhead dan Provit 15 % 17,473.50
F Harga Satuan Pekerjaan (D+E) 133,963.50

15 Memasang 1 Buah Bak Kontrol Pasangan Batu Bata Ukuran 30 x 30 Cm, Tinggi 35 Cm RSNIT 15-2002
Kode Harga Jumlah Harga
No Koefisien Satuan
Uraian Satuan satuan (Rp) (Rp)
A TENAGA
Pekerja 2.160 OH 88,000 190,080.00
Tukang Batu 0.720 OH 132,000 95,040.00
Kepala Tukang 0.073 OH 159,500 11,643.50
Mandor 0.011 OH 143,000 1,573.00
JUMLAH HARGA TENAGA 298,336.50
B BAHAN
Batu Merah 40.000 Bh 1,200 48,000.00
Portland semen (tonasa 50 kg) 44.000 Kg 1,760 77,440.00
Pasir Pasang 0.070 M3 275,000 19,250.00
Kerikil Beton 0.070 M3 24,200 1,694.00
Besi Beton Ulir 1.600 Kg 425,000 680,000.00
Pasir Beton 0.060 M3 275,000 16,500.00
JUMLAH HARGA BAHAN 842,884.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 1,141,220.50
E Overhead dan Provit 15 % 171,183.08
F Harga Satuan Pekerjaan (D+E) 1,312,403.58

19 Memasang 1 Buah Kran Diameter 3/4" RSNIT 15-2002


Kode Harga Jumlah Harga
No Koefisien Satuan
Uraian Satuan satuan (Rp) (Rp)
A TENAGA
Pekerja 0.010 OH 88,000 880.00
Tukang Batu 0.400 OH 132,000 52,800.00
Kepala Tukang 0.040 OH 159,500 6,380.00
Mandor 0.0050 OH 143,000 715.00
JUMLAH HARGA TENAGA 60,775.00
B BAHAN
Kran Air 3/4" 1.000 Bh 15,750 15,750.00
Seal Tape 0.025 Bh 5,000 125.00
JUMLAH HARGA BAHAN 15,875.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 76,650.00
E Overhead dan Provit 15 % 11,497.50
F Harga Satuan Pekerjaan (D+E) 88,147.50

20 Memasang 1 Buah Kran Diameter 1/2" RSNIT 15-2002


Kode Harga Jumlah Harga
No Koefisien Satuan
Uraian Satuan satuan (Rp) (Rp)
A TENAGA
Pekerja 0.010 OH 88,000 880.00
Tukang Batu 0.400 OH 132,000 52,800.00
Kepala Tukang 0.040 OH 159,500 6,380.00
Mandor 0.0050 OH 143,000 715.00
JUMLAH HARGA TENAGA 60,775.00
B BAHAN
Kran Air1/2" 1.000 Bh 12,500 12,500.00
Seal Tape 0.025 Bh 5,000 125.00
JUMLAH HARGA BAHAN 12,625.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 73,400.00
E Overhead dan Provit 15 % 11,010.00
F Harga Satuan Pekerjaan (D+E) 84,410.00

21 Memasang 1 M' Pipa Galvanis Diameter 3/4" RSNIT 15-2002


Kode Harga Jumlah Harga
No Koefisien Satuan
Uraian Satuan satuan (Rp) (Rp)
A TENAGA
Pekerja 0.054 OH 88,000 4,752.00
Tukang Batu 0.090 OH 132,000 11,880.00
Kepala Tukang 0.009 OH 159,500 1,435.50
Mandor 0.0270 OH 143,000 3,861.00
JUMLAH HARGA TENAGA 21,928.50
B BAHAN
Pipa Galvanis Diameter 3/4" 1.200 M' - -
Perlengkapan 35% x Harga Pipa -
JUMLAH HARGA BAHAN -
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 21,928.50
E Overhead dan Provit 15 % 3,289.28
F Harga Satuan Pekerjaan (D+E) 25,217.78

22 Memasang 1 M' Pipa Galvanis Diameter 1" RSNIT 15-2002


Kode Harga Jumlah Harga
No Koefisien Satuan
Uraian Satuan satuan (Rp) (Rp)
A TENAGA
Pekerja 0.054 OH 88,000 4,752.00
Tukang Batu 0.090 OH 132,000 11,880.00
Kepala Tukang 0.009 OH 159,500 1,435.50
Mandor 0.027 OH 143,000 3,861.00
JUMLAH HARGA TENAGA 21,928.50
B BAHAN
Pipa Galvanis Diameter 1" 1.200 M' - -
Perlengkapan 35% x Harga Pipa -
JUMLAH HARGA BAHAN -
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 21,928.50
E Overhead dan Provit 15 % 3,289.28
F Harga Satuan Pekerjaan (D+E) 25,217.78

23 Memasang 1 M' Pipa Galvanis Diameter 1 1/2" RSNIT 15-2002


Kode Harga Jumlah Harga
No Koefisien Satuan
Uraian Satuan satuan (Rp) (Rp)
A TENAGA
Pekerja 0.108 OH 88,000 9,504.00
Tukang Batu 0.180 OH 132,000 23,760.00
Kepala Tukang 0.018 OH 159,500 2,871.00
Mandor 0.005 OH 143,000 715.00
JUMLAH HARGA TENAGA 36,850.00
B BAHAN
Pipa Galvanis Diameter 1 1/2" 1.200 M' - -
Perlengkapan 35% x Harga Pipa -
JUMLAH HARGA BAHAN -
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 36,850.00
E Overhead dan Provit 15 % 5,527.50
F Harga Satuan Pekerjaan (D+E) 42,377.50

24 Memasang 1 M' Pipa Galvanis Diameter 3" RSNIT 15-2002


Kode Harga Jumlah Harga
No Koefisien Satuan
Uraian Satuan satuan (Rp) (Rp)
A TENAGA
Pekerja 0.135 OH 88,000 11,880.00
Tukang Batu 0.225 OH 132,000 29,700.00
Kepala Tukang 0.023 OH 159,500 3,668.50
Mandor 0.007 OH 143,000 1,001.00
JUMLAH HARGA TENAGA 46,249.50
B BAHAN
Pipa Galvanis Diameter 2,5" (Medium B) 1.200 M' 27,000 32,400.00
Perlengkapan 35% x Harga Pipa 11,340.00
JUMLAH HARGA BAHAN 43,740.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 89,989.50
E Overhead dan Provit 15 % 13,498.43
F Harga Satuan Pekerjaan (D+E) 103,487.93

25 Memasang 1 M' Pipa Galvanis Diameter 4" RSNIT 15-2002


Kode Harga Jumlah Harga
No Koefisien Satuan
Uraian Satuan satuan (Rp) (Rp)
A TENAGA
Pekerja 0.135 OH 88,000 11,880.00
Tukang Batu 0.225 OH 132,000 29,700.00
Kepala Tukang 0.023 OH 159,500 3,588.75
Mandor 0.007 OH 143,000 1,001.00
JUMLAH HARGA TENAGA 46,169.75
B BAHAN
Pipa Galvanis Diameter 4" 1.200 M' - -
Perlengkapan 35% x Harga Pipa -
JUMLAH HARGA BAHAN -
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 46,169.75
E Overhead dan Provit 15 % 6,925.46
F Harga Satuan Pekerjaan (D+E) 53,095.21

26 Memasang 1 M' Tipe AW Diameter 1/2" RSNIT 15-2002


Kode Harga Jumlah Harga
No Koefisien Satuan
Uraian Satuan satuan (Rp) (Rp)
A TENAGA
Pekerja 0.036 OH 88,000 3,168.00
Tukang Batu 0.060 OH 132,000 7,920.00
Kepala Tukang 0.006 OH 159,500 957.00
Mandor 0.002 OH 143,000 286.00
JUMLAH HARGA TENAGA 12,331.00
B BAHAN
Pipa PVC Tipe AW Diameter 1/2" 1.200 M' 7,144 8,572.50
Perlengkapan 35% x Harga Pipa 3,000.38
JUMLAH HARGA BAHAN 11,572.88
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 23,903.88
E Overhead dan Provit 15 % 3,585.58
F Harga Satuan Pekerjaan (D+E) 27,489.46
27 Memasang 1 M' Tipe AW Diameter 3/4" RSNIT 15-2002
Kode Harga Jumlah Harga
No Koefisien Satuan
Uraian Satuan satuan (Rp) (Rp)
A TENAGA
Pekerja 0.036 OH 88,000 3,168.00
Tukang Batu 0.060 OH 132,000 7,920.00
Kepala Tukang 0.006 OH 159,500 957.00
Mandor 0.002 OH 143,000 286.00
JUMLAH HARGA TENAGA 12,331.00
B BAHAN
Pipa PVC Tipe AW Diameter 3/4" 1.200 M' 6,456 7,747.00
Perlengkapan 35% x Harga Pipa 2,711.45
JUMLAH HARGA BAHAN 10,458.45
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 22,789.45
E Overhead dan Provit 15 % 3,418.42
F Harga Satuan Pekerjaan (D+E) 26,207.87

28 Memasang 1 M Tipe AW Diameter 1" RSNIT 15-2002


Kode Harga Jumlah Harga
No Koefisien Satuan
Uraian Satuan satuan (Rp) (Rp)
A TENAGA
Pekerja 0.036 OH 88,000 3,168.00
Tukang Batu 0.060 OH 132,000 7,920.00
Kepala Tukang 0.006 OH 159,500 957.00
Mandor 0.002 OH 143,000 286.00
JUMLAH HARGA TENAGA 12,331.00
B BAHAN
Pipa PVC Tipe AW Diameter 1" 1.200 M' 8,573 10,287.00
Perlengkapan 35% x Harga Pipa 3,600.45
JUMLAH HARGA BAHAN 13,887.45
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 26,218.45
E Overhead dan Provit 15 % 3,932.77
F Harga Satuan Pekerjaan (D+E) 30,151.22

29 Memasang 1 M' Tipe AW Diameter 1 1/2" RSNIT 15-2002


Kode Harga Jumlah Harga
No Koefisien Satuan
Uraian Satuan satuan (Rp) (Rp)
A TENAGA
Pekerja 0.054 OH 88,000 4,752.00
Tukang Batu 0.090 OH 132,000 11,880.00
Kepala Tukang 0.009 OH 159,500 1,435.50
Mandor 0.003 OH 143,000 429.00
JUMLAH HARGA TENAGA 18,496.50
B BAHAN
Pipa PVC Tipe AW Diameter 1 1/2" 1.200 M' 14,923 17,907.00
Perlengkapan 35% x Harga Pipa 6,267.45
JUMLAH HARGA BAHAN 24,174.45
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 42,670.95
E Overhead dan Provit 15 % 6,400.64
F Harga Satuan Pekerjaan (D+E) 49,071.59

30 Memasang 1 M' Tipe AW Diameter 2" RSNIT 15-2002


Kode Harga Jumlah Harga
No Koefisien Satuan
Uraian Satuan satuan (Rp) (Rp)
A TENAGA
Pekerja 0.054 OH 88,000 4,752.00
Tukang Batu 0.090 OH 132,000 11,880.00
Kepala Tukang 0.009 OH 159,500 1,435.50
Mandor 0.003 OH 143,000 429.00
JUMLAH HARGA TENAGA 18,496.50
B BAHAN
Pipa PVC Tipe AW Diameter 2" 1.200 M' 21,273 25,527.00
Perlengkapan 35% x Harga Pipa 8,934.45
JUMLAH HARGA BAHAN 34,461.45
C PERALATAN

-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 52,957.95
E Overhead dan Provit 15 % 7,943.69
F Harga Satuan Pekerjaan (D+E) 60,901.64

31 Memasang 1 M' Tipe AW Diameter 2 1/2" RSNIT 15-2002


Kode Harga Jumlah Harga
No Koefisien Satuan
Uraian Satuan satuan (Rp) (Rp)
A TENAGA
Pekerja 0.081 OH 88,000 7,128.00
Tukang Batu 0.135 OH 132,000 17,820.00
Kepala Tukang 0.014 OH 159,500 2,153.25
Mandor 0.004 OH 143,000 572.00
JUMLAH HARGA TENAGA 27,673.25
B BAHAN
Pipa PVC Tipe AW Diameter 2 1/2" 1.200 M' 27,623 33,147.00
Perlengkapan 35% x Harga Pipa 11,601.45
JUMLAH HARGA BAHAN 44,748.45
C PERALATAN

-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 72,421.70
E Overhead dan Provit 15 % 10,863.26
F Harga Satuan Pekerjaan (D+E) 83,284.96

32 Memasang 1 M' Tipe AW Diameter 3" RSNIT 15-2002


Kode Harga Jumlah Harga
No Koefisien Satuan
Uraian Satuan satuan (Rp) (Rp)
A TENAGA
Pekerja 0.081 OH 88,000 7,128.00
Tukang Batu 0.135 OH 132,000 17,820.00
Kepala Tukang 0.0135 OH 159,500 2,153.25
Mandor 0.004 OH 143,000 572.00
JUMLAH HARGA TENAGA 27,673.25
B BAHAN
Pipa PVC Tipe AW Diameter 3" 1.200 M' 35,031 42,037.00
Perlengkapan 35% x Harga Pipa 14,712.95
JUMLAH HARGA BAHAN 56,749.95
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 84,423.20
E Overhead dan Provit 15 % 12,663.48
F Harga Satuan Pekerjaan (D+E) 97,086.68