[romano Tepe fating [ma | Houma [Ptaaati= | Free PP
>| owsz07 Tevet rap ra [sins [wasn | Wren
cr_| amcor | Retowed br Revew ma [sng [wasn | Tz
| razor Tse Revew za [anne [wasn | Ter
A | teate0t7 | ioral evn Ra [SLANG | _WOSIR
vev | tanoon i onpean | bPeRMSA | OSETUN | OERNSA | ORETUU
fe PERTAMINAEPCALCULATION SHEET FOR DUCT BANK AND CULVERT
FEED POWER GENERATING & TRANSMISSION FACILITY
FPP-JRK-RE-CS-CA-003
Rev. 0
Hal 2 dari 24
TABEL REVISI
Rev. TANGGAL Deskripsi
a 13-Mar-2017 issued for Internal Review
ci 17-Mar-2017 Issued for Review
cr 28-Apr-2017, [Re-Issued for Review
oO ‘Q-Moi-2017, Issued for Approval z
17,CALCULATION SHEET FOR DUCT BANK AND CULVERT
FEED POWER GENERATING & TRANSMISSION FACILITY
FPP-JRK-RE-CS-CA-003,
Rev. 0
Hal 3 dari 24
DAFTAR ISI
1. TUJUAN
2. RUANG LINGKUP
3.1STILAH
3.1 PERUSAHAAN
3.2 KONTRAKTOR:
4.3 KONSULTAN/PMC.
3.4 VENDOR,
3.5 MIGAS
3.6 INSPEKTOR
4, KODE, STANDAR DAN SPESIFIKAS!
5. KRITERIA DESAIN
5.1 SPESIFIKASI MATERIAL
5.2 PARAMETER KESTABILAN TANAH
5.9 SATUAN
5.4 PROPERTI TANAH
6. PONDASI OUTLINE
7. DATA PEMBEBANAN DAN PERHITUNGAN BEBAN
7.1 BEBAN MAT! (D)
7.2 BEBAN KENDARAAN
8, ANALISA DAN DESAIN PONDAS!
8.1 CEK KAPASITAS DAYA DUKUNG TANAH
8.2 PERHITUNGAN TULANGAN
9. OUTLINE CULVERT
9.1 GENERAL DESCAIPS!
9.2 ANALISA DATA
9.3 ANALISA STABILITI
9.4 REINFORCEMENT DESIGN
LAMPIRAN
AA Plot Plan
B. Loading Data
. Data Tanah
HalamanFPP-JRK-RE-CS-CA-003
Rev. 0
Hal 4 dari 24.
CALCULATION SHEET FOR DUCT BANK AND CULVERT
FEED POWER GENERATING & TRANSMISSION FACILITY
4. TUJUAN
Laporan perhitungan ini menganalisis dan merencanakan kestabilan serta kekuatan dari stuktur fondasi Fuel Gas Filter
pada Proyek FEED POWER GENERATING & TRANSMISSION FACILITY, milik PT. PERTAMINA EP, yang beriokasi di
Jirak, Sumatera Selatan
2. RUANG LINGKUP
LLaporan perhitungan ini menganalisa dan merencanakan kestabilan serta kekuatan dari struktur pondasi DUCT BANK AND
CULVERT pada proyek FEED POWER GENERATING & TRANSMISSION FACILITY, milk PT. PERTAMINA EP.
Nama Fasiitas DUCT BANK ANO CULVERT
Proyok FEED POWER GENERATING & TRANSMISSION FACILITY
Lokasi 2 JIRAK- SUMSEL
Pemilic PT. PERTAMINA EP
Tipe Pondasi Pondasi Dangkal
3.ISTILAH
Dalam Fitosof ini, kata-kata atau kalimat maupun istiah harus mempunyai arti sebagaimana ditentukan dibawah ii, kecuali
sitentukan atau isebut lain
3.1 PERUSAHAAN
Perusahaan yang dimaksudkan adalah PT. PERTAMINA EP solaku pork dan pengguna fasiliias ahi.
3.2 KONTRAKTOR
Pihak yang dpi oleh PERUSAHAAN sebagai pelaksana pekerjaan FEED (Front End Engineoring Dosign) WTIP di
Japangan dirak, Field Pendopo, dalam hal ini adalah PT. REKAYASA ENGINEERING yang akan bertanggung jawab
kepada PERUSAHAAN sebagaimana ditini dalam kontraknya, scope of work atau work order.
3.3 KONSULTANIPMC
Pihak yang ditunjuk oleh PERUSAHAAN dan sebagai wakil dari PERUSAHAAN untuk malakukan pengawasan proyek
3.4 VENDOR
Pinak Lain yang akanmenyediakan sesualu untuk kebuluban proyek selain yang disediakan oleh PERUSAHAAN dan
KONTRAKTOR disebut VENDOR, dimana tanggung jawabny alangsung kepada KONTRAKTOR balk terhadap PO
atau bentuk perjanjam lain antara VENDOR dan KONTRAKTOR.
3.5 MIGAS
Suatu Badan dari Pemerintah Indonesia yang bertanggung jawab terhadap proses persetujuan & ijn untuk semua
fasiltas di Lingkungan Minyak&. Gas.
3.6 INSPEKTOR
Perwakilan dari PERUSAHAAN dan atau seseorang yang diberikan oleh PERUSAHAAN yang bertanggungiawab
‘sebagai INSPEKTOR atas pekerjaan yang dilakukan ole KONTRAKTOR.
4, KODE, STANDAR DAN SPESIFIKASI
PROJECT SPECIFICATION
FWTP-JRK-RE-CS-SP-001 ‘Sposifikasi Desain untuk Pokerjaan Sipil dan Strutural
JRK-UNSAL-CS-RE-001 Soil Investigation & Topography Survey Lapangan Jirak (eksisting data)
CODES AND STANDARDS
‘SNH-03-2847:2002 Indonesian Reinforced Concrete Design
SNET726:2012 Indonesian Seismic Cade for Building and Non Building.
ASCEISEL 7-10 ‘American Society of Civl Engineers
Aci 318-14 Building Code requirement for Structural ConcreteFPP-JRK-RE-CS-CA-003,
Rev. 0
Hal 5 dari 24.
CALCULATION SHEET FOR DUCT BANK AND CULVERT
FEED POWER GENERATING & TRANSMISSION FACILITY
MATERIAL CODES
Rebar ‘SNI-07-2052-2002 BJTS-40 for deform bar
Concrete ‘Shall conform to ACI 318 and ASTM C150 or equivalent
Cement Shall conform to ACI 318 and ASTM C38 or equivalont to
5. KRITERIA DESAIN
5.1 SPESIFIKASI MATERIAL,
BETON
Lantai Keria fol = [15 MPa
Beton struktural cs = [728 MPa
BAJA TULANGAN
Common Rebar
Kuat Tarik yd =
Kyat Utimate fad =
SERAT SPESIFIK MATERIAL
Baja Struktur 7701 KN
Beton struktural 23.58 kNims
Lantai Keria 21.57 kNim3
Air 9.81 KNimS
5.2 PARAMETER KESTABILAN TANAH
SSeluruh pondasi harus didesain sedemikian rupa schingga faktor Keamanannya tidak kurang dar nila yang disebutkan
bawan ini
1. Sliding Stability pada pondasi dangkal
Bosar faktor keamanan gaya tanan triksiterhadap gaya total gesor tidak kurang dai 1.5
2. Overturning Stabiliy pada pandasi dangkal
FFakior keamanan tahanan berbanding momen guling aktual yang teradi tidak boleh Kurang dati 1.5
3, Buoyancy
Faktor keamanan antara total beban mat terhadap gaya angkat (bouyancy) tidak Kurang dari 1.1
4. Penurunan yang dizinkan adalah 25mm pada 90% darajat konsolidas, Kecual disebutkan lain pada hasil Laporan
Penyolidikan Tanah.
5.3 SATUAN
SSaluan yang digunakan adalah satuan Intemasional, KN sebagai saluan Gaya, meter sebagai satuan jarak dan Mpa
sebagai satuan tekanan,
544 PROPERTI TANAH
karaktoristk geologis mengacu pada dokumen Soil Investigation & Topography Survey Lapangan Jirak (eksisting data)
Investigation Point . BH.2
Borat jenis tanah ys = [4435 Nims
Borat jenis air vw 9.81 kNim3
Brat jenis lapisan perkerasan jalan Yer = [20 kim
Undrained shear strength cu = [11.4 kNma.
‘Sudut geser 0 23.8 ° (deg)
Tinggi Muka air Tanah (GWL) ow = [050m
Gal = 19.24 tonim2
Kotisien tanah Pasit Kp = tan2 (45 + 812)
= tan? (45 + 23.82)
235FPP-JRK-RE-CS-CA-003
Rev.0
FEED POWER GENERATING & TRANSMISSION FACILITY Hal 6 deri 26
CALCULATION SHEET FOR DUCT BANK AND CULVERT
6. PONDAS! OUTLINE
Lebar perkerasan Bpv =
Tebal perkerasan Tov
Diameter dalam pipa - Gin 10 = [1524 mm.
Tebal pipa Tp = ‘8 mm
Diameter uar pipa 0b = [168.4 mm.
Area satu pipa ‘Ap = | 22273 mma
Jumlan pipa arah horizontal mh 3ea
Jumlah pipa arah vertkal nv = 2ea
Jarak horizontal (Jarak pjpa pada gambar elekirkal akan mengikut jarak 00 mm
JJarak vertkal —pipa pada gambar sip) 300 mm.
Lebar duct bank yang dipakai ed - [850mm |
Tinggi duct bankyang dipakai Hd ~ [600 mm
Panjang duct bank ta = [9000 mm
‘Area duct bank ad = [7.65 m2,
Rasio panjang (L'Bd) ~ [ose]
Tinggi tanah di atas duct bank Ho = [1500 mmCALCULATION SHEET FOR DUCT BANK AND CULVERT
FEED POWER GENERATING & TRANSMISSION FACILITY
Fi
-PP-JRK-RE-CS-CA-003
Rev. 0
Hal 7 dari 24
7. DATA PEMBEBANAN DAN PERHITUNGAN BEBAN
7.1 BEBAN MATI (0)
Berat senditi
Volume Beton = {Bd x Hd) - (nx Ap} x Lo
[(0.85m x 0.6m) - (Gea x 0.022m2)] x 9m
Berat Beton = Vexye
= 2.39 m3 x 23.54 kNimg
Beban Iain distas Duct Bank
Borat tanah diatas Duct Bank ysxhso xB xLd
14,35 kNim3 x 1.5 mx 0.85 m x9m
erat perkerasan datas Duct Bank = ye x tpy x bpv x B
= 23.54 kN)m3 x0.2 mx 6m x0.85 m
Total borat diatas Duct Bank Ws + Wow
Total beban mati We + Wu
Tekanan tanah dibawah Duct Bank = DL/Ad = 288.41kN/7.65m2
7.2 BEBAN KENDARAAN
Ve =
wey =
wu =
3.3873 m3]
79.736 KN
164.67 KN
188.68 KN
268.47 KN,
35.087 KNim2
‘Mengacu kepada: ANI T-02-2008 (Pembebanan Truk "T") Page 22 of 63,CALCULATION SHEET FOR DUCT BANK AND CULVERT Ere ECS aoe)
Rev. 0
FEED POWER GENERATING & TRANSMISSION FACILITY pala
Beban ik das bebangandar (borat kenderaan) Fa =
Beban impact dar Keraraan (20%) o2xPo fs) aw
Beban tk PorPi = 205445 PL = _2704N
Beban roda os an Pp =| 135 KN
2 2
Gunakan beban roda (P) untuk desain maksimum beban kendaraan
Bean tekanan dari salu rada kendaraan di atas Duct Bank
Boban da P= t95KN
Jarak roa ke bawah duct bank Hiso + Ha Me | cial
Areabeban ret Ax2im2 Av 17.64 m2
Tekanan da rodakendaraan ao
8, ANALISA DAN DESAIN PONDASI
8.1 CEK KAPASITAS DAY DUKUNG TANAH
Daya dukung tanah krits akan diperksa pada saat kondisi kris, yaitu Ketka 2 kendaraan lewat di waktu yang sa
ci atas Bank duct,
“Tekanan yang tejadi dari kondlst i atas
tet = od + 4av 35.09KNim2 + (4 x 7.65KN'm2) cxot - [65.699 KNime
Daya dukung tanah yang diiznkan cau = [470.26 Kwme
Soil bearing capacity check = OK, Gall > Qtot]FPP-JRK-RE-CS-CA-003
Rev. 0
Hal 9 dari 24.
CALCULATION SHEET FOR DUCT BANK AND CULVERT
FEED POWER GENERATING & TRANSMISSION FACILITY
8.2 PERHITUNGAN TULANGAN
Desain Duct Bank didesain sebagai strukturbalok di bawah tanah dengan menggunakan fie but foundation (Mx, My, Mz
+= release). Dari Staad pro akan didepat gaya dalam dar strukturtersebut
8.2.1 Perletakan
Porhitungan untuk Subgrade modulus (Ks)
Ks = 40xSFxQallxA (Bowles, 1992)
dimana:
Ks = Subgradle modulus (KN)
all = Daya dukung tanah yang dizinkan (kNim2)
SF Fakiorkeamanan= 25
A ‘Area Meshing
Ks = 40x25x110.26xBdx1
40x25%x110.26x085x1 = 9972474 KN
= 985400 kg
8.2.2 Staad Input Load
ter = 65.7 kNim2
Beban merata gisepanjang duct bank = = «85.8 kNim.
8.2.3 Hasil Staad Pro
Momen dari Staad Pro
Geser dari Staad Pro
Lt tod mall
Momen mut = [$394 KN
Geser vult 64.71 KNCALCULATION SHEET FOR DUCT BANK AND CULVERT
FPP-JRK-RE-CS-CA-003,
Rev. 0
FEED POWER GENERATING & TRANSMISSION FACILITY Heo ee
Desain penulangan
Tinggi Duct Bank ht 600 mm Kuat tekan beton fe = 28MPa
Lebar b= 850 mm Tegangan eich baja ty = 390 MPa
Selimut beton co = [50mm Diameter tulangan D = [16mm
tobal eft ¢ 542 mm Jarak aniar tuiangan $= [_ 200mm
Fn = —_Mt__ 5a4 270.02 Nima = 0270 MPa
Oita"? 08x 0.85 x05822
5 |
8S E 1 fh 2k = 0.00070
& VY 085-f, J
085: /,085( 600)
tl pmin = 0.00180
‘Exceed maximum" Jt p> pmax
lp sitpmax > p> pmin
freq = [pmin AE (43)p > prin = 6 prea = [0.00080
ar3}pmin “AH pmin > (4°3}p > 0.5emin
loSpmin cotherwise
las keperan tulangan Asreq = preqxb xh
= 0.0009 x 860 x 600 Aste = (a9 nae]
Diameter tlangan D 16 mm Asbot = ix0.25xmxd"2
Jarak antar tlangan S = 200mm = 5x0.25 x1 x 162
Jumiah tulangan er) = [4005 mme_]
sto a0.
[Status penuiangay ‘Asbot> Asreq_] [Gunakan tulangan D16@200mm ]
[Tulangan atas & bawahCALCULATION SHEET FOR DUCT BANK AND CULVERT FPP-JRK-RE-CS-CA-003
Rev. 0
FEED POWER GENERATING & TRANSMISSION FACILITY Hal 11 of 24
9, OUTLINE CULVERT
9.1 GENERAL DESCRIPSI
t +
|
| ‘|
[soo | soo | soo | soo | soo | soo | soo |
Soil:
Berat jenis tanah yso 1435] kg/m?
Kohesi tanah e = [1320]kgim?
Sudut goser » = [ 24.4}d09
Koetisien tanah Pasit Ka = tarf(. 45deq )
tan? ( 45deg — = 2408
Culvert:
Panjang culvert LU t]m
Tinggi culvert ha = [070|m
Lebar dalam culvert bd = [_£.05]m
Tebal Cover Slab he 0.25|m
Tebal bottom slab hs 0.25|m
Tebal dinding w = [025|m
Tebal pavement cf = [_020|m
Tebal support ts 0.20)m
Panjang support 's = [-260|m
Tinggi support hs 0.20|m
Tinggi tanah diatas culvert hso 1.30]m
Lebar pavement lp = [6.00)mCALCULATION SHEET FOR DUCT BANK AND CULVERT
FPP-JRK-RE-CS-CA-003
Rev. 0
FEED POWER GENERATING & TRANSMISSION FACILITY Hal 12 of 24
Tinggi total dinging H he + hd + hs
025° + 070 + 025
1.20 m
Lebar total culvert (bd): B bd + 21w
100 + @x 025 )
150 m
Lebar cover slab be B
1.50 m
Beban surcharge as = [1 Jtowma
Tinggi muka air tanah hwater 0.50 below GL
9.2 ANALISA DATA
92.1 BERAT SENDIRI
Berat concrete cover Wey = ye. bd. he.L
2400 x 150 x 025 x 120
= 10800 kg
10.80 ton
Bera dinding concrete Ww = ve.hd.tw.L.2
24 x 070 x 03 x 120 x 2
10.08 ton
Borat slab concrete Ws = yo.B.hs.L
= 24 x 180 x 03 x 120
= 10.80 ton
Berat concrete struktur We = Wev+ Ww+Ws
= 1080 + 1008 + 1080
= 31.68 ton
Boral concrete Support Wis = ye.ts.hs.Is.2
= 2400 x 02 x 020 x 26x 2
= 499.2 kg
= 050 ton
Berat pipa Wp 500 kg
= 05 ton
Berat tanah diatas culvert Wsoil = yso..hso. bd. L
= 1435 x 190 x 15 x 12
= 33579 kg
= 33.58 ton
Borat pavement Wpv = yc. tp. bd. ip
= 2400 x 02 x 18 x 60
= 4320 kg
= 432 ton
‘Total Seltweight Wsw = We+Wts + Wp + Wsoil + Wpv
70.58 tonCALCULATION SHEET FOR DUCT BANK AND CULVERT FPP-JRK-RE-CS-CA-003
Rev. 0
FEED POWER GENERATING & TRANSMISSION FACILITY Hal 13 of 24
9.22
BEBAN LATERAL
Beban Lateral akibat Surcharge =
‘Tekanan tanah per 1m panjang b= 1m
Beban surcharge q = 1 tone = 1000 kgina.
Berat pavement per m? Wp = Ipxyc
= 02 x 2400 = 480 kgima
a1 = (q+ Wp) Ka = 3563 kgim2
Tekanan lateral tanah =
o2 = Ka x (ys0 x (H+hso))
= 24 x( 14395 x 1200 + 190 }
= 8638 kgim2CALCULATION SHEET FOR DUCT BANK AND CULVERT FPP-JRK-RE-CS-CA-003
Rev. 0
FEED POWER GENERATING & TRANSMISSION FACILITY Hal 14 of 24
9.23 TEKANAN AKIBAT BEBAN KENDARAAN.
Refer to: RSNI T-02-2005 (Pembebanan Truk "T*) Page 22 of 63
Menggunakan kendaraan HS20-44 sebagai data beban kendaraan _(Appendix B-AASHTO 1996)
Boban terpusat roda Po 11.25 }ton
Boban impact roda kendaraan (20%): Pi 02x Po
= 02 x 125
2.25 ton
Beban terpusat Pp Po + Pi
1125 + | 2.25
13.50 ton
Tekanan lateral tanah sebagai beban terpusat
Edition (Joseph E. Bowles) and Principles of Foundation Engineering th Ealtion (Braja M. Das)
Jarak horizontal P terhadap dinding x 100 cm (asumsi)
Tinggi total Hi=hd+he+hso Hi 2.25 m
Kedalaman culvert: Heul = hd Heu= 2.00 m
Dari GL
Loc. 1 (elevasi atas culver!)
A= How
a= 200 m
mp = ode nee, es
me = 089 5
oh 0.765 tonne/m®CALCULATION SHEET FOR DUCT BANK AND CULVERT FPP-JRK-RE-CS-CA-003
Rev. 0
FEED POWER GENERATING & TRANSMISSION FACILITY Hal 15 of 24
Loo. 2
wm - 02H,
z= 045 m ieee
mp = 044 -2
" 020 se
oh = 2.783. tonnelm?
2 = 04K
2 = 090 m
mp 044 fa
np = 040 e
oh = 3.264 tonne/m®
oo.
os,
135 m
oa z
0.60 *” Ar
oh = 1.937 tonneim?
Loc. 5
a = 08H,
1.80 m
0.44
0.80 7 3
1.016 tonne/m* \™p py
Loc. 6 felovasi bawah culver!)
B=
B= 225 m
mp 0.44
1.00
oh = — 0.543. tonneim®CALCULATION SHEET FOR DUCT BANK AND CULVERT FPP-JRK-RE-CS-CA-003
Rev. 0
FEED POWER GENERATING & TRANSMISSION FACILITY manieciar
9.3 ANALISA STABILITI
93.1 GEK DAYA DUKUNG TANAH
gat = [1E2E}torme
ek daya dukung tanah
Tekanan dari roda P= 1350 ton
Gunakan beban roda (P) untuk desain maksimum beban kendaraan
Beban tekanan dar satu roda kendaraan di atas culvert
Beban roda P= 1350 ton
JJarak roda ke bawah duct bank = Hso+ H H+hso = 25 m
Area beban (2x(H+hsoy? = (2x 2.5my"2 Av = 25 m2.
Tekanan dari 1 toda kendaraan ov = [054 tonima
Daya dukung tanah kritis akan diperiksa pada saat kondisi kritis, yait Ketika 2 kendaraan lewat di waktu
yang sama (4 roda)
Wow
eet = (4x ov + WO
* Se cers)
qact = 6.08 tonm2
ek daya dukung tanah
Daya dukung iin tanah gal = 1424 toni
OKICALCULATION SHEET FOR DUCT BANK AND CULVERT
FEED POWER GENERATING & TRANSMISSION FACILITY
FPP-JRK-RE-CS-CA-003
Rev. 0
Hal 17 of 24
93.2 CEK SETTLEMENT
Elastic Settlement
S=AH
dimana S$ = Tolal Settlement
AH = Elastic Sottiement
Elastic Settlement
Elastic settlement
dimana
AH Elastic settlement
a
go. tekanan di bawah culvert 6081
8 lebar culvert = 150
ys Betatjenis 1435. kal!
¢Kohesi Tanah 1140 kai
4, Sudut Geser 28°
poisson ratio 0.30
Es , Young Modulus Elasticity = 2000000
koma
Influence factor 11 / 12, bisa dihitung dengan persamaan stoinbrenner (1934)
Influence factor ue UB
N= SHB
eeniateen ley wee le (ahora
i Penton) JL (ne fntents
(reas)
Steinbrenner Infienae factor (Is)
koe
Untuk ria If, that gate
depth ratio (018)
+L. ox
8
Length ratio (L/B)
L op ROTH
acy
Elastic settlement pada center culvert
AH = 6081.01 x 1.5 [(1-0.3°2)/ 2000000] x [0.35 + (1-20.21(1-0.3] x 0.025) x 0.71
= 0.001105 m
= 1.10 mm
S' aH
1.105
= 1.105 mm [Settlement < 25mm—>0KCALCULATION SHEET FOR DUCT BANK AND CULVERT FPP-JRK-RE-CS-CA-003
Rev. 0
FEED POWER GENERATING & TRANSMISSION FACILITY Hal 18 of 24
9.33 DEFLECTION PADA CONCRETE COVER SLAB
r B T
Beban terpusat kendaraan :
Beban roda Po = 11.25 ton
Boban Impact dari kendaraan (20%) Pi 225 ton
Beban tik P= 13.80 ton
Kalas
Lebar concrete cover (pert m) 6 2 in
Tebal Cover Slab ho = 025 m
= ve.he.B
= "2400 x 025 x 1.00
= (600. kgim
= 06 tonim
Borat tanah datas culver (per 1 m)
« = 3 thin
P= 1850 ton (ceban terpusat dal kendaraan)
t= bpn? = tx 10 x( 025 » 0.00130
= [eadEr6 forme {asumsi
al 8 1.00 (rolerto: SNI 03-2847 - 2002)
300 300
= 0.00125 m
1 Pb" 5 ac.b*
48 E) sede
Lg 13500 pot .00_ A SEibe ecee er emnooys
ae * 2406.08 x 000 + Ged * —BanES x 000i
0.00010 m
Status ‘deflection ---> OK" if dc NOTOK’ if 8 > dal
ve
Status: “deflection ~-> OK"CALCULATION SHEET FOR DUCT BANK AND CULVERT FPP-JRK-RE-CS-CA-003
Rev. 0
FEED POWER GENERATING & TRANSMISSION FACILITY Hal 19 of 24
9.4 REINFORCEMENT DESIGN
: Sa
Mx max = (12 dex ot ely’) + (119 be x 1/2 012 xy’) +(1/2 hex max oh x ly2)
(1/2 x 1 x 3563.48 x 1.2°2) + (1/3 x1 x 1/2 x 8637.85 x 1.2°2)(1/2 x 1 x 542.89 x 1.2"2)
"
Se
= [467 ]mm (diameter tulangan)
1S 0.9xbxd 09 Ke tO xt ater F
peal = ty uv a 0.85 fc
wm xP toe wot 8 1
ne ty 6120 + fy
400 t 61200 + 400CALCULATION SHEET FOR DUCT BANK AND CULVERT FPP-JRK-RE-CS-CA-003
Rev. 0
FEED POWER GENERATING & TRANSMISSION FACILITY Hal 20 of 24
pmax = 075xpb
= 075 x 0.04299
= 00318
req. = [*Change Wall Thickness" if pcal > pmax preq = 0.0075
pcal if pcal > prin Asreq = preab.d
prin if pmin > peal 0.00755_x_ 1000 x 167
= [630.425 mma
(n=layernos= 2 )
Try Rebar diameter
Giametertuiangan sD 16 mmm
Jaraktulangan S = 200 mm
Cross sectional Asprov_= ix 0.25x xd Sx025xnxt62 = [1005.3 mma
TTulangan status = OK
[Tulangan dinding : Gunakan tulangan
Asprov > Asreq | _ |D16@200mm (2 layers)CALCULATION SHEET FOR DUCT BANK AND CULVERT
FPP-JRK-RE-CS-CA-003
min = 0.0018
Rev. 0
FEED POWER GENERATING & TRANSMISSION FACILITY rar oiferee
9.4.2. PERHITUNGAN BOTTOM SLAB
|
, 8 500m
| B 150m
soma Awa A = 75 ma
Penulangan pela anti cihtung per 1 meter
Beban roda Wr = 1950 ton
= 480° tanin
Borat send We = Wow / xB
= 7058; 12x 15
= 392 tonim
Quit = 1.4(Wr + We) Quit = 8.01 ton/m
Moment i bawah bottom stab
Mult = 1/8 Quit x B®
= 22526 tum
Tulangan Transversal slab :
D = 16 |mm (diameter diameter)
> = 100—m
(hs) 025 |m (teal slab)
Jaraktlangan (5) 200 |mm
jirtehtiengin@ = b/s = 100 7 20 = §
Selmutbeton: c= 75 mm = 0075 m
6 wec- D2 = 025 + 0075 - 0008 = 0.167 m
Kalkulasi
ute
m= be
2.050
oa x 10x (0167
= 897466 tonne
0897 MpaCALCULATION SHEET FOR DUCT BANK AND CULVERT FPP-JRK-RE-CS-CA-003
Rev. 0
FEED POWER GENERATING & TRANSMISSION FACILITY Hal 22 of 24
0.85 fe 2.8n
y = OEE. a
pal Bo Me Sg
09s x 25 , 2x 0897
xEt = a .
400 t ct 0.85 x 25 W
08s x 2 i :
SR Et 0.0845]
= 0.00229
0.85 f0.0.85 6120
poe ty ( 6120 + ty
_ 08s. 25. i 6120 '
= 400 6120 + 400
= 0.08239
pmax = 078xpb
- 075 x 0.042386
= 0.031789
req = [*Change Wall Thickness" it peal > pmax prea = (0.00283
pcal if pcal > pmin
min if 1.93 peal > pmin > pcal
Asteq = preabd
= 0.0023 x 1000 x 167
~ [382.96 mm2
(n=layernos= 2 )
Try Rebar diameter
Diameter tulangan 16 mm
Jarak tulangan S = 200 mm
Cross sectional Asprov_= ix0.25xmxd®° = _5x0.25x1x 16% = [1005.3 mm2
[Status twlangan = oO FTulangan slab = gunakan tulangan 016@200mm
Asprov > Asreq | _|(2 layers)CALCULATION SHEET FOR DUCT BANK AND CULVERT
FPP-JRK-RE-CS-CA-003
Rev. 0
FEED POWER GENERATING & TRANSMISSION FACILITY Hal 23 of 24
9.43 TULANGAN CONCRETE COVER
P= 13,50 ton (LL)
B= 10 m
c 10m
We = BxLxnoxye
= 11x0.25 x 2400
= 600 kg
0.6 tonim
Ws = 1.87 tonim
Pot = 15.97 ton
Mul = 1.4118 , Ptot. B°
= 2.79 tonm
Tulangan Longitudinal
0 TE ]mm (diameter tulangan)
b 1 |m
the) ~ [025 |m (ebalcover)
Jarak tulangan(s) = [200 |mm
jumlah tulangan () bis = 1000 / 200 = §
Selmutbeton: ¢ = 80 mm = 005 m
q tw-c- D2 = 025 005 - 0.016 = 0.192 m
2.794
“C9 x 1 (O12
= 84212 tonm2
= 08421 Mpa
pmin = 0.0018
0.85 te 2.Rn
ped = SE Mt Seer
sts. 2 x __0.gea1
400 ae ue iar aeeane 2
= 0.00215
pb _ 0.85 fc 0.85 6120
: vy (Roy)
Eo nsteeceeeoss nee os 6120
- 400 ‘gra?
0.04239CALCULATION SHEET FOR DUCT BANK AND CULVERT FPP-JRK-RE-CS-CA-003
Rev. 0
FEED POWER GENERATING & TRANSMISSION FACILITY Hal 240820.
pmax = 0.75xpb
= 075 x 004239
= 003179
preg = |*Change Slab Thickness* if pcal > pmax preq == 0.00215
peal it pcal > prin Asreq = prea.bd
Jpmin if pmin > pcal = 0.00215 x 1000 x 192
= [412.565 mma.
(n=layernos= 2 )
Ty Rebar dia
Diameter tulangan = sD = 16mm
Jarak tulangan S = 200 mm
Gross sectional Apion = ix025xmxd? = 5x 0.25xmx16%2 = [7005-3 mma
‘Status tulangan = [Tulangan cover : gunakan tulangan|
pare > Asreq, |D16@200mm (2 layers)LAMPIRANLAMPIRAN A
PLOT PLANA)
FERRELAMPIRAN B
LOADING DATAbe.
it}
Loreen tty
i
pur TMTLAMPIRAN C
DATA TANAH
5é
eh Seer.LAPORAN SOIL INVESTIGATION
FEED WATER TREATMENT
INJECTION PLANT
Rev. At
Hal 19 dari 49
82
a oe Te oe
‘0 3200 zero nrg,
a ar aoe.
aN ie S008.
at as E108.
z
a 9 Hee ee i GH BET aD
po az a sz saya sede =
ous mat mer ar cewea|Z
bas ed Byrd Le wanes emt]
Hanys GaaUTISONN|
ween OE Teen 00S Teen OE os
Nowanosaa ‘on
7
Nvavias vuaLyuns
DIMI NVONVaYT IO INY'Id H3MOd 0334 NVO dLIM 0334
Annsau 1S3Lasin 59 ‘SOIL INVESTIGATION & TOPOGRAPHY ( &
Ss
‘SURVEY LAPANGAN JIRAK
No. Dok, :-JRK-UNSRI-CS-RE-001
LAPORAN SOIL INVESTIGATION Rev, 0
Halaman 28 dari 62
4.5. Analisa Kapasitas Dukung Pondasi Dangkal
Perhitungan kapasitas dukung pondasi dangkal dapat dilihat pada Tabel 5 dibawah ini:
Tabel 5. Nilai Kapasitas dukung pondasi dangkal bujur sangkar dengan lebar 1m
Keaton
Bor | | Pons) me) | degee | ME | MT | NO) aad | ati’ | Gon’
sot [oss] as | ago a0 | sear |
sree | oes | os | 97.00 300 | 17.35 |
snes | ose | os | 1500 300 | 1793 | 446.03 | 4450
BHO4 | os os | 960 300 | 1634 | 22865 | 2296
ares | oss | os 300 | zoe | 45561 | «556
BHT Togs | 10 sal car llaeel | mers
BHO2 | 0.68 a ip 3,00 17,35 240,12 24,01
acs [oe |e goo Lares | 48420 | as00
3x0 | 090 | 10 300 | 1634 | 23682 | 2568
aos | owe bois ao Lore [sa | seer
sHo1 | oss | 15 450 340 | 1597 | 13051 | 1305
sno2 | oes | 45 97,00 300 | 1735 | 248.80 | 24.88
BHO3 | oes 45 1900 | s.00 | 1793 | 46327 | 45,33
BH04 | oss | 15 60 300 | 1634 | 24498 | 24.50
BHOS | 088 45 1940 300 | 20.12 | 47573 | 4757
4.6. Analisa Penurunan Pondasi Dangkal
a. Penurunan Segera Pondasi Dangkal
Perhitungan penunurunan segera pondasi dangkal dapat dilihat pada Tabel 6 dibawah ini
Tabel 6. Nilai Penurunan Segera (Immadiate settlement) pondasi dangkal
Kedalaman| Qa s Immediate
No. Bor | B(m) | Pondasi (tonma) | Settlement
(m) | (kNim2) | (cm)
BHOt “10 05 112.40 | 11,24 0.60)
BHO2 1.0 05 | 231.45 | 23,14 0.69
BHO3 10 05 445,33 | 44,53 0,80
BHO4 1.0 05 228,65 | 22,86 0,68
4.0 os | 45561 | 45.56 0.81(w00'2 wdep Buz0og avenbg 0} )
oc=sa ease
)
ce=s4 soe = (2/1) ajgemene
(00's wideo Bunoes a1erbg 25)
Oeesd ore = (zu1/2) aigemene
ee Ee 300 ro | Ez Te _[55z
SH0E WEE Boo ero) wT Ez ae [ost
1S5z SEE 30 ero] rr wz et loo
Tay ror 35 TT
waworeg |dep Suvesgan] 49 29 faneis ayoedg | wooo aunsion
Toa beaussTog # 1ybez7e1 Aap
z Ha #20198 wi g0'% <= W100" Wadep ’ UoREpUNoy Mo}eYS 10} JUBWIERag *y AyjDedeo BuLeOR
sisfeue quawionas g Ayjsedeo Buueog =
YIP NVONVdV7 IG INV Td H3MOd G334 ¥ diLM 033d?
su
403P0ud
NOILVONNOS MOTIVHS 40} LNSWSTLSS 8 ALIOVdVO ONINW3d
Tie ay By SNe ISLAMPIRAN D
ENGINEERING DRAWING