*HARGA SATUAN MATERIAL *HARGA SATUAN UPAH PEKERJA

HARGA SATUAN
NO URAIAN UKURAN HARGA SATUAN (Rp) NO URAIAN SATUAN
UPAH PEKERJA
SEMEN BIASA 1 Tukang Kayu (Rp 80.000,00) 1 orang/hari/8jam 0,200
1 SEMEN HOLCIM sak (Rp 62.000,00) 2 Kepala Tukang Kayu (Rp 90.000,00) 1 orang/hari/8jam 0,020
2 SEMEN 3 RODA sak (Rp 61.000,00) 3 Tukang Batu (Rp 75.000,00) 1 orang/hari/8jam 0,500
3 SEMEN PADANG sak (Rp 60.000,00) 4 Kepala Tukang Batu (Rp 90.000,00) 1 orang/hari/8jam 0,050
4 SEMEN BATURAJA sak (Rp 62.000,00) 5 Tukang Besi Beton (Rp 75.000,00) 1 orang/hari/8jam
SEMEN PUTIH 6 Kepala Tukang Besi Beton (Rp 90.000,00) 1 orang/hari/8jam
1 Semen Kingkong sak (Rp 155.000,00) 7 Tukang Besi Profil (Rp 85.000,00) 1 orang/hari/8jam
2 Semen Putih 3 Roda (WM) sak (Rp 90.000,00) 8 Kepala Tukang Besi Profil (Rp 95.000,00) 1 orang/hari/8jam
3 Semen Putih Gajah sak (Rp 90.000,00) 9 Tukang Las (Rp 85.000,00) 1 orang/hari/8jam
4 Semen Putih 3 Roda (WC) sak (Rp 95.000,00) 10 Tukang Gali (Rp 60.000,00) 1 orang/hari/8jam
PASIR 11 Tukang Cat/Politur (Rp 75.000,00) 1 orang/hari/8jam
1 Pasir Hitam Cor m3 (Rp 220.000,00) 12 Kepala Tukang Cat/Politur (Rp 90.000,00) 1 orang/hari/8jam
2 Pasir Cilegon m3 (Rp 180.000,00) 13 Sopir (Rp 90.000,00) 1 orang/hari/8jam
3 Pasir Mundu m3 (Rp 225.000,00) 14 Kenek Truk (Rp 70.000,00) 1 orang/hari/8jam
4 Pasir Cileungsi m3 (Rp 185.000,00) 15 Pekerja (Rp 60.000,00) 1 orang/hari/8jam
BATU 16 Pekerja Terampil (Rp 75.000,00) 1 orang/hari/8jam
1 Batu Andesit (30x30) m2 (Rp 15.000,00) 17 Mandor (Rp 95.000,00) 1 orang/hari/8jam
2 Batu Kali Belah m2 (Rp 175.000,00) 18 Buruh Lapangan Tak Terlatih (Rp 60.000,00) 1 orang/hari/8jam
3 Batu Candi (30x30) m2 (Rp 110.000,00) 19 Buruh Lapangan Kurang Terlatih (Rp 70.000,00) 1 orang/hari/8jam
4 Batu Split pick up (Rp 250.000,00) 20 Buruh Lapangan Terlatih (Rp 90.000,00) 1 orang/hari/8jam
5 Batu Split truck (Rp 1.250.000,00)
6 Batu Bata Merah (oven) buah (Rp 600,00)
7 Batu Bata Merah (biasa) buah (Rp 450,00)
KERAMIK
1 Bintan m2(11/dos (Rp 47.500,00)
2 Cargo m2(11/dos (Rp 46.000,00)
3 Clarin m2(11/dos (Rp 46.000,00)
PIPA
1 Pipa Medium Hitam SCH40 1/2 " 6 m/batang (Rp 120.000)
2 Pipa Medium Hitam SCH40 3/4 " 6 m/batang (Rp 190.000,00)
3 Pipa Medium Hitam SCH40 1 " 6 m/batang (Rp 235.000,00)
4 Pipa Medium Hitam SCH40 1 1/4 " 6 m/batang (Rp 320.000,00)
5 Pipa Medium Hitam SCH40 1 1/2 " 6 m/batang (Rp 398.000,00)
6 Pipa Medium Hitam SCH40 2 " 6 m/batang (Rp 505.000,00)
7 Pipa Medium Hitam SCH40 2 1/2 " 6 m/batang (Rp 805.000,00)
8 Pipa Medium Hitam SCH40 3 " 6 m/batang (Rp 1.050.000,00)
9 Pipa Medium Hitam SCH40 4 " 6 m/batang (Rp 1.495.000,00)
10 Pipa Medium Hitam SCH40 5 " 6 m/batang (Rp 2.475.000,00)
11 Pipa Medium Hitam SCH40 6 " 6 m/batang (Rp 2.615.000,00)
12 Pipa Medium Hitam SCH40 8 " 6 m/batang (Rp 4.150.000,00)
Indoor Hydrant Box
1 Indoor Hydrant Box Type B unit (Rp 5.400.000,00)
2 Indoor Hydrant Box Type A2 unit (Rp 4.500.000,00)
3 Indoor Hydrant Box Type A1 unit (Rp 3.600.000,00)
4 Indoor Hydrant Box Type Trolly unit (Rp 7.400.000,00)
5 Indoor Hydrant Box Type C unit (Rp 4.500.000,00)
6 Indoor Hydrant Box Type C2 unit (Rp 5.400.000,00)
Pillar Hydrant
1 Hydrant Pillar Two Way unit (Rp 2.200.000,00)
2 Pelengkapan Hydrant Pillar unit (Rp 2.300.000,00)
KAYU
1 Plywood tebal 9 mm lbr -Rp 102.900,00-
2 Kayu Meranti type M2 (26 x 32 mm) m3 -Rp 19.350.961,54-
3 Reng (meranti 2 x 3 ) m3 -Rp 26.333.333,33-
4 Kaso (meranti 5 x 7) m3 -Rp 11.714.285,71-
5 Galar (meranti 5 x 10) m3 -Rp 12.600.000,00-
6 Kayu Terlentang (papan uk 3 x 20 x 400 cm) m3 -Rp 3.013.200,00-
7 Kayu borneo (papan 3/20 ) m3 -Rp 15.833.333,33-
8 Kayu borneo (kaso 5/7 ) m3 -Rp 12.914.285,71-
9 Paku kayu biasa 4 cm kg -Rp 20.600,00-
10 Dolken Gelam diameter 8-10/400cm btg -Rp 35.000,00-
11 Kayu Kruing uk 4x6x400 cm m3 -Rp 11.825.700,00-
12 kayu kruing uk 8x12x400 cm m3 -Rp 11.608.200,00-
13 kayu Kruinguk 6x12x400 cm m3 -Rp 12.255.700,00-
14 Kayu Borneo m3 -Rp 8.500.000,00-
15 Kayu meranti 8 x 12 m3 -Rp 6.119.791,67-
MINYAK BEKISTING
1 Minyak Bekisting kg -Rp 11.550,00-
BESI, PAKU DAN KAWAT
1 Besi Beton D 8@1 M kg -Rp 8.426,60-
2 Besi Beton D 10@1 M kg -Rp 8.231,45-
3 Besi Beton D 12@1 M kg -Rp 8.278,76-
4 Paku kayu 2 cm kg -Rp 24.800,00-
5 Paku Kayu 4 cm kg -Rp 20.600,00-
6 Paku Kayu 5 cm kg -Rp 18.500,00-
7 Paku 12 cm kg -Rp 18.600,00-
8 Paku Beton 5 cm kg -Rp 38.000,00-
9 Paku reng Kayu (5 cm) kg -Rp 14.500,00-
10 Paku 7 cm kg -Rp 14.500,00-
11 Kawat Beton kg -Rp 21.900,00-
12 Besi Plat Strip kg -Rp 13.500,00-
POMPA
1 Jockey Pump unit -Rp 11.800.000,00-
2 jockey pump Centrifugal unit -Rp 13.450.000,00-
ALAT LISTRIK
1 Broco Fitting plafond/gantung unit -Rp 3.200,00-
2 Philips Essential 18 watt unit -Rp 35.200,00-
3 Kabel NYM 3x2,5 mm2 (50 M) roll -Rp 964,00-
4 Philips Essential 8 watt unit -Rp 27.100,00-
5 Stop Kontak Broco Outbow unit -Rp 28.900,00-
6 Saklar Tunggal Broco 1G E161 White unit -Rp 18.800,00-
7 Saklar Seri Broco Plano E162 White unit -Rp 22.600,00-
8 Stop Kontak Bravo Plano CP E154 Sliver unit -Rp 22.900,00-
9 Panel Listrik MCB 3 pole 16 A unit -Rp 18.500,00-
10 Kabel toefoer NYY 4x4 mm2 (100 M) roll -Rp 24.113,00-
11 Nol Arde unit -Rp 36.800,00-
12 Kabel BCC 16 mm2 m -Rp 19.500,00-
13 PVC Wavin Ø20mm m -Rp 1.575,00-
14 inbowduss kotak unit -Rp 6.000,00-
15 Pipa kabel PLN Ø 2'' (wavin D) m -Rp 6.566,67-
PERENCANAAN SISTEM HYDRANT HALAMAN TAMAN PUSPA DEPOK

kebutuhan suplai air 40 l/s


Kapasitas Bak 324 m3
jika panjang dan lebar bak air adalah 3 x 6 m
maka tinggibak air adalah: 18 m

jangkauan 1 pillar hydrant = r 100 m


luas jangkauan fire hydrant (luas lingkaran) 31415,92654
m
31415 m

KEBUTUHAN PILLAR HYDRANT


Luas
Luas Pillar Hydrant yang
Jangkauan
Daerah Dibutuhkan
Pillar Hydrant
(m2) (m2) (unit)
75.316 31415 2,40
jumlah 3

KEBUTUHAN AIR SEBUAH PILLAR HYDRANT


Pasokan Waktu
Volume Air yang
Air Pillar Pasokan Air
Dibutuhkan
Hydrant Simpanan
(L/detik) (Menit) (Liter) p l t
40 45 108000

Total
Volume Air Volume Air Total
Pillar
Pillar Hydrant Seluruh Pillar Hydrant
Hydrant
(unit) (Liter) (Liter)
3 108000 324000