A. UPAH
1 Mandor Rp. 90,000.00 /Oh
2 Kepala Tukang Rp. 100,000.00 /Oh
3 Tukang Rp. 850,000.00 /Oh
4 Pekerja Rp. 70,000.00 /Oh
B. BAHAN
1 Koral Rp. 150,000.00 / M3
2 Batu Kali Rp. 70,000.00 / M3
3 pasir Urug Rp. 75,000.00 / M3
4 Pasir Pasang Rp. 112,000.00 / M3
5 Kayu Kelas IV Rp. 1,800,000.00 / M3
6 Semen Tipe I Rp. 1,300.00 / Kg
7 Batu Pata Rp. 650.00 / buah
8 Semen Putih Rp. 2,200.00 / Kg
9 Paving Block Rp. 1,300.00 / Bh
DAFTAR ANALISA
Rp 36,820.00
Rp 4,680.00
Rp 41,500.00
Rp 90,000.00
Rp 21,000.00
Rp 900.00
Rp 111,900.00
Rp 165,000.00
Rp 211,900.00
Rp 58,240.00
Rp 510,000.00
Rp 6,000.00
Rp 105,000.00
Rp 5,250.00
Rp 1,061,390.00
Rp 11,076.00
Rp 1,904.00
Rp 127,500.00
Rp 1,500.00
Rp 14,000.00
Rp 900.00
Rp 156,880.00
Rp 6,760.00
Rp 2,240.00
Rp 127,500.00
Rp 1,500.00
Rp 14,000.00
Rp 900.00
Rp 152,900.00
Rp 45,500.00
Rp 24,635.00
Rp 4,256.00
Rp 85,000.00
Rp 1,000.00
Rp 22,400.00
Rp 13,500.00
Rp 196,291.00
Rp 45,500.00
Rp 13,350.00
Rp 297,500.00
Rp 10,000.00
Rp 50,400.00
Rp 31,500.00
Rp 448,250.00
RENCANA ANGGARAN BIAYA
HARGA
NO URAIAN PEKERJAAN VOLUME ANALISA HATUAN
(Rp)
I PEKERJAAN PERSIAP
1 Pek. Pas. Bowplan/pen 1.00 Unit Ls 750,000.00
2 Pembuatan Papan nama 1.00 Unit Ls 400,000.00
3 PPPK 1.00 Unit Ls 300,000.00
4 Pengadaan Air Kerja 1.00 Unit Ls 1,500,000.00
5 Administrasi dan Dokum 1.00 Unit Ls 750,000.00
II PEKERJAAN TANAH /
1 Pek. Galian Tanah 11.57 M3 ABK-Pper 6.4 41,500.00
2 Pek. Urugan Pasir Kemb 1.01 M3 ABK-PT 6.11 111,900.00
IV PEKERJAAN LAIN-LAI
1 Pek. Pembersihan Akhi 1.00 Unit Ls 500,000.00
REKAPITULASI
I PEKERJAAN PERSIAPAN
II PEKERJAAN TANAH / PASIR
III PEKERJAAN BATU / PASANGAN
IV PEKERJAAN LAIN-LAIN
SUB JUMLAH
PPN 10 %
TOTAL JUMLAH
DIBULATKAN
Terbilang : Seratus empat belas ribu sembilan ratus delapan puluh tujuh ribu rupiah
JUMLAH
HARGA
SATUAN (Rp)
750,000.00
400,000.00
300,000.00
1,500,000.00
750,000.00
3,700,000.00
480,155.00
113,019.00
593,174.00
1,392,919.00
###
573,169.72
3,978,476.80
3,632,904.00
500,000.00
1,067,500.00
###
500,000.00
500,000.00
###
Rp593,174.00
###
Rp500,000.00
###
###
###
###
RENCANA ANGGARAN BIAYA
0.14
0.17 19.90 19.90 19.86 19.86 19.86 0.27
0.35 20.25 40.15 60.01 79.87 99.73 100.00
DAFTAR ANALISA
Proyek :
Pekerjaan : Pemasangan Paving Block
Luas :
Luas :
Kabupaten :
Tahun Anggaran :
M2 RSNI T-12-2018
pekerjaan pembersihan
volume = 22 x 1.4 x 2 = 61.6 M²
5.7 x 11.2 = 63.8 M²
8.4 x 1.4 = 11.8 M²
total = 137 M³
Pekerja = 0.1000 X 137 = 13.7 Hok
mandor = 0.0050 X 137 = 0.69 Hok
Pekerjaan Baja,
kanopi
volume = P L T unit
6.2 6 4 4 = 595.2 kg
Tiang Pondasi 0.13 0.13 3.24 6 = 0.328536 kg
Pondasi Angkur 0.13 0.13 0.2 6 = 0.02028 kg
total 595.5488 kg 5.96 kg
penutup atap
volume = 5.7 x 11.2 = 63.84 M²
Genteng mental 0.463 x 63.84 = 29.56 Bh
Paku mental 0.25 x 63.84 = 15.96 Kg
Pekerja 0.287 x 63.84 = 18.32 Hok
Kepala tukang 0.029 x 63.84 = 1.85 Hok
Mandor 0.029 x 63.84 = 1.85 Hok
Alat bantu 0.02 x 63.84 = 1.28 Hok