BAGIAN V
RENCANA ANGGARAN BIAYA
No Uraian Satuan
UPAH
1 Pekerja hari
2 Tukang hari
3 Mandor hari
4 Operator hari
5 Pembantu operator hari
6 Sopir hari
7 Pembantu sopir hari
8 Mekanik hari
9 Pembantu mekanik hari
10 Kepala tukang hari
1 BAHAN BANGUNAN m3
2 Pasir m3
3 Batu kali
4 Agregat kasar
5 Agregat halus
6 Filler
7 Batu belah
8 Gravel
9 Marerial tanah timbunan
10 Asphalt cement
11 Kerosene/ minyak tanah
12 Semen
13 Besi beton
Kawat beton
No Uraian Satuan Harga (Rp)
50,000.00
58,000.00
62,000.00
62,500.00
50,000.00
62,500.00
5.2 HARGA SATUAN DASAR PERALATAN
50,000.00
Harga satuan dasar peralatan untuk pekerjaan peningkatan jalan62,500.00
ruas dapat dilihat pada Tabel 8.2.
50,000.00
61,000.00
m3 77,500.00
No Uraian Satuan Harga (Rp)
kg 85,000.00
3
1 Asphalt mixing plant mjam 150,000.00
1,600,000.00
m3 155,000.00
2 Asphalt finisher jam 190,000.00
m3 500.00
3 Asphalt sprayer jam 65,000.00
kg 100,000.00
4 Bulldozer jam 415,000.00
liter 110,000.00
5 Compressor jam
kg 167,000.00
67,500.00
6 Concrete mixer jam
kg 75,000.00
7,812.50
7 Crane jam
kg 323,000.00
14,000.00
8 Dump truck 3T jam 238,000.00
2,000.00
9 Dump truck 5T jam 190,000.00
9,500.00
10 Excavator jam 14,000.00
265,000.00
11 Generator set jam 180,000.00
No Uraian Satuan Harga (Rp)
PERSIAPAN
Administrasi dan
1 Ls Dokumentasi 3,500,000.00 3,500,000.00
Pembuatan
1 Ls Basecamp 7,000,000.00 7,000,000.00
Pembuatan Kantor
1 Ls Lapangan 4,000,000.00 4,000,000.00
1 Ls Pembuatan Gudang 4,000,000.00 4,000,000.00
Sewa Kendaraan
1 bh Roda 4 15,000,000.00 15,000,000.00
Sewa Kendaraan
2 bh Roda 2 8,000,000.00 16,000,000.00
1 Ls Biaya Laboratorium 4,000,000.00 4,000,000.00
Perabot dan
1 Ls Peralatan Proyek 4,500,000.00 4,500,000.00
2 bh Papan Nama Proyek 300,000.00 600,000.00
Pemindahan Tiang
18 bh Listrik 4,500,000.00 81,000,000.00
Pemindahan Tiang
133 bh Telepon 2,000,000.00 266,000,000.00
Pemindahan Traffic
8 bh Light 4,000,000.00 32,000,000.00
20 bh Penebangan Pohon 25,000.00 500,000.00
438,100,000.00
Harga Upah Harga
Jumlah
Jml Sat Uraian Pekerjaan Satuan Kerja Alat/ Bahan
(Rp)
(Rp) (Rp) (Rp)
MOBILISASI
2.00 unit Asphalt finisher 600,000.00 1,000,000.00
2.00 unit Asphalt sprayer 600,000.00 1,000,000.00
Bulldozer 100-150
2.00 unit hp 1,200,000.00 2,000,000.00
1.00 unit Compressor 600,000.00 500,000.00
3.00 unit Concrete mixer 300,000.00 600,000.00
2.00 unit Generator set 600,000.00 1,000,000.00
5.00 unit Dump truck 3-4 m3 300,000.00 1,250,000.00
5.00 unit Dump truck 300,000.00 1,250,000.00
Excavator 80-140
1.00 unit hp 1,200,000.00 1,000,000.00
1.00 unit Wheel loader 1,200,000.00 1,000,000.00
1.00 unit Tandem roller 6-8 T 1,200,000.00 1,000,000.00
1.00 unit Tyre roller 8-10 T 1,200,000.00 1,000,000.00
1.00 unit Vibrator roller 5-8 T 1,200,000.00 1,200,000.00
5.00 unit Concrete vibrator 50,000.00 250,000.00
2.00 unit Water pump 200,000.00 400,000.00
1.00 unit Water tanker 600,000.00 600,000.00
2.00 set Equipment survey 200,000.00 400,000.00
2.00 unit Motor grader 1,200,000.00 2,400,000.00
1.00 LS Demobilisasi 15,000,000.00 15,000,000.00
32,850,000.00
PEKERJAAN TANAH
Pekerjaan Galian per m3
B. Bahu Jalan
V = 2 x Lebar Bahu Jalan x Tebal Bahu Jalan x Panjang Jalan
V = 2 × 1 × 0,325 × 445,38 = 289,497 m3
2. Lapis overlay
V = Lebar Perkerasan Tambahan x Tebal Overlay x Panjang Jalan
V = (7 × 0.15 ×33,662) + (3,5 × 0.15 × 39,540) = 56,103 m 3
Jumlah 488,727
Total volume galian = Luas galian x lebar (pelebaran jalan+median+bahu jalan)
= 488,727 m2 x 7 m
= 3.421,089 m3
I. Drainase Jalan
1. Galian
V = Lebar Drainase x Tinggi Drainase x Panjang Jalan x 2
V = 0,8 × 0,6 × 315,909 × 2 = 303,272 m 3
0.1
0.4
0.3
J. Gorong-gorong
Gorong – gorong dipasang melintang jalan dengan Ø 50 cm, panjang tiap gorong –
gorong 20 meter dan jumlah gorong – gorong adalah 23 buah
K. Pelengkap Jalan
1. Marka dan Pembatas Tepi Jalan
• Marka
Jarak antara : 2,5 meter
Lebar : 0,6 meter
Panjang : 1,5 meter
Jumlah : 2 marka sepanjang ruas jalan
445,38
V= 0,6 × 5 ×
×2
(3 + 5)
= 334,035 m2
= 1068,912 m3
• Zebra Cross
Bentang Lebar Pelebaran Beton K-350 Vol. Tulangan Vol. Tulangan Total Vol. P.C.I Tiang Pancang Ø60
Nama Jembatan
(m) Eksisting (m) (m) (m3) Memanjang (m3) Melintang (m3) Tulangan (m3) Girder cm, h = 10m
PEKERJAAN MEDIAN
Pemasangan kerb tipe B 208,967.81 27,920,189.09
Pemasangan paving block 44,619.29 11,923,166.67
PEKERJAAN JEMBATAN
Jembatan Kaligung LS 38,237,500.00 38,237,500.00
Jembatan K. Soko LS 2,900,000.00 2,900,000.00
Jembatan K. Manggis LS 17,237,500.00 17,237,500.00
Jembatan I LS 42,112,500.00 42,112,500.00
Jembatan Blondo 1 7,639,187,500.00 7,639,187,500.00
Jembatan K. Kunjang 79,908,000.00 79,908,000.00
Jumlah 66,805,973,458.89
Jasa Kontraktor 10% = 6,680,597,345.89
Jumlah = 73,486,570,804.78
PPN 10% = 7,348,657,080.48
TOTAL = 80,835,227,885.25
Dibulatkan = 80,835,227,800.00
Terbilang : Delapan Puluh Milyar Delapan Ratus Tiga Puluh Lima Juta Dua Ratus Dua
Puluh Tujuh Ribu Delapan Ratus Rupiah
m² 1623,74
bh 40,00
bh 135.00
m 133,61
2
m 267,22
Dibulatkan = 4,113,597,000.00